Loading...
Resolution 81-16718 'FORM 722-61 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION , DIVISION OF ROAD OPERATIONS 1-74 CITY RESOLUTION PAGE 1 OF i UTILITY INSTALLATIONS 622878 COUNTY SECTION UTILITY JOB NO. L STATE ROAD NO. COUNTY NAME PARCEL& R/W JOB NO. 87 000 6652 Biarritz Dr. Dade 2 N/A A RESOLUTION REGARDING UTILITY JOINT PROJECT AGREEMENT BETWEEN THE CITY OF Mimi Beach___________ ._ AND THE STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION; AUTHORIZING THE EXECUTION OF SUCH AGREEMENTS; AND AUTHORIZING THE PLACING OF FUNDS WITH THE STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION FOR THE COMPLETION OF THE UTILITY INSTALLATION. RESOLUTION NO.___81-16718 WHEREAS, the State of Florida Department of Transportation is constructing, reconstructing or otherwise lr rwise changing a portion ortion of the State Highway System, between Bi arri tz Dr. bri dge over mg Normandy Isles , which shall call for the installation of new City water an sewer facilities over and/or under said highway, AND WHEREAS, the City requires additional water and sewer _ capacity in certain locations within the construction limits of this project, AND WHEREAS, the City has heretofore authorized that plans and specifications be prepared for the installation of said new City facilities over and/or under said highway, andspecifications have been prepared and approved Post, Buckley, AND WIIEREAS, the plans specifi.,at p p pp fry Schuh & Jernigan Engineering Company and the City Engineering Department; such plans and specifications to be made a part of the Department's highway construction contract, NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF Mi ami Beach , FLORIDA: That the City of __Miami each enter into a JOINT PROJECT AGREEMENT with the State of Florida Department of Transportation for installation by the DEPARTMENT of said new City facilities designated as Utility Job 5652 , Section 00 , Parcel_ . , R/W Job VA , and that the City assume all costs incurred in the respective utility installations, which costs are estimated to be $ 1000. 00 ; and, That the Mayor and City Clerk be authorized to enter into such agreements with the State of Florida Department of Transportation for the installation of said new City facilities, and, That the estimated costs of such utility installations as set forth above be paid in advance to the State of Florida Department of Transportation in accordance with such utility installation agreement. D UCED AND PASSED bytheCityCommission of the City of Miami Beach INTRODUCED s 'ori this 15th of July .9, 1981 Florida, in regular session, day Iayor-Cz- �. ATTEST: - 41 . - 1 . City A 4 Clerk A ,79) -1,0-1A-1,)" 6u/4 FORM 722-05 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 11-79' DIVISION OF ROAD OPERATIONS PAGE,, OF 1. UTILITY/RAILROAD RELOCATION SCHEDULE 622878 itOUNTY SECTION UTILITY JOB NO. STATE ROAD NO. COUNTY NAME PARCEL& R/W JOB NO. FAP NO. 87 000 6652 Biarritz Dr. Dade 1 N/A BRZ-006-(2) AGENCY CITY OF MIAMI BEACH A. Facilities Involved (Detail as to Type and Location): 12" WATER LINE ON EXISTING BRIDGE B. Relocation Work Anticipated (Describe and Relate to Location on Project): INSTALL 12" WATER LINE ON NEW BRIDGE AND APPROACHES C. Anticipated Relocation Schedule (Based on normal schedule and 5-day work week): ITEM DAYS ESTIMATED Preliminary Engineering Material Procurement Right of Way Acquisition Contract Negotiations (for utility/railroad work) Other 6 0 Construction (actual utility/railroad relocation time at job site) ( ) ESTIMATED MAXIMUM TOTAL 60 Days ADJUSTED UTILITY/RAILROAD RELOCATION PERIOD 30 (Allow for concurrent activities) ESTIMATED MINIMUM TOTAL Days * See Highway Contract Special Provisions D. Special Notation(s) to be included in Highway Contract Special Provisions: PLACEMENT OF SUPPORTS FOR 12" WATER MAIN ON NEW BRIDGE E. This AGENCY proposes to commence actual relocation and/or adjustment work: (Check one) I 1 prior to highway contract advertisement, and relocation should be 0 % complete bydate of preconstruction conference. ❑ concurrently with project advertisement. ®x concurrently with commencement of highway construction. The above data is based on construction plans and schedules prepared by the DEPARTMENT, and, therefore, is furnished for informational purposes only. This AGENCY is not responsible for circumstances beyond its normal control. However, the AGENCY will endeavor to fully cooperate with the DEPARTMENT, and its Contractor, in clearing the project right of way as expeditiously as possible. The AGENCY'S Field Representatives can be contacted at: Telephone Number: SUBMIWAIKOKyTactn4ENCY BY: Date7/2v 7 Director .1 Public r s DEPARTMENTAL APPROVAL BY: Date: District Utility Engineer ORIGINALN441 RESOLUTION NO. 81-16718 (Authorizing Utility joint project agreement between CMB and Florida State Dept, of Trans- portation for placement of supports for in- stallation of 12" water main on new Biarritz Drive bridge and approaches) g\-1 1 1.