Loading...
Resolution 81-16719 • FORM 722-61 STATE OF FLORIDA DEPARTMIENT OF TRANSPORTATION 1-74 DIVISION OF ftOAD OPERATIONS PAGE 1 0F CITY RESOLUTION 1 ` r • UTILITY INSTALLATIONS • 622877 COUNT SECTION UTILITY JOH NO. STATE ROAD NO. COUNTY NAME PARCEL at R/W JOA NO. • 87060 6541 A-1-A Dade 1 N/A CARDING UTILITY JOINT PROJECT AGREEMENT BETWEEN THE CITY OF A RESOLUTION REGARDING AND THE STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION; AUTHORIZING THE EXECUTION OF SUCH AGREEMENTS; AND AUTHORIZING THE PLACING OF FUNDS WITH THE STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION FOR THE COM:'LETION OF THE UTILITY INSTALLATION. RESOLUTION NO81-16719 WHEREAS, the State of'lorida Department of Transportation is constructing, reconstructing or S.R. A-1-A MacArthur Causeway East otherwise changing a portion of the State Highway System, .._.. _ - Channel ver Intra- which shall call for the installation of new City facilities over and/or under said highway, AND requires WHEREAS, the Cityreq uires additional water _ - capacity in certain locations within the construction limits of this project, AND WHEREAS,HEREAS the City y has heretofore authorized that plans and specifications be prepared for the installation of said new City facilities over and/or under said highway, have been prepared and 1s F1 o r i da AND WHEREAS, the plans and specifications .. ' p l y_ - _ Department ofTransportation Ansi the City Engineering Department; such plans and specifications to be made a part of the Department's highway-construction contract., NOW, THEREFORE, BE IT RESOLVED BY TilE CITY COMMISSION OF TnE CITY OF Miami Beach , FLORIDA: That the City of 1a. each enter into a JOINT PROJECT AGREEMENT with the State of Florida Department of Transportation for installation by the DEPARTMENT of said new >' •ti , designated as Utility Job 6541 _.._._, Section 060 ,.Parcel__ 1 • City facilities de�i�itate � W N/A and that the assume all costs incurred in the respective utility installations, R��� job City which costs are estimated to be $ - 2,000.00 ; and, That the Mayor and City Clerk be authorized to enter into such.as eeme;its with the State of Florida Department of Transportation for the installation of said new City facilities, and, i p That the estimated costs of such utility installations as set forth above be paid in advance to the State of Florida Department of Transportation in accordance with such utility installation agreement. INTRODUCED AND PASSED by the City Commission of the City ofMiami Beach Florida, th day July .�_T � 1981 I� in re��ular session, this of ATTEST:TOIA City A .1'► . d C Jerk P*7"/ -6f/ t 717 ' C4 ( VVL ', 1' y FORM 722-05 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 11-79 DIVISION OF ROAD OPERATIONS PAGE 1 OF 1 UTILITY/RAILROAD RELOCATION SCHEDULE COUNTY SECTION UTILITY JOB NO. STATE ROAD NO. COUNTY NAME PARCEL& R/W JOB NO. FAP NO. 87 060 6541 A-1-A Dade 1 N/A N/A AGENCY CITY OF MIAMI BEACH A. Facilities Involved (Detail as to Type and Location): 2011 WATER MAIN ON THE EAST BRIDGE OF MACARTHUR CAUSEWAY B. Relocation Work Anticipated (Describe and Relate to Location on Project): TEMPORARY RELOCATION OF 2011 WATER MAIN ON THE EAST BRIDGE OF THE MACARTHUR CAUSEWAY C. Anticipated Relocation Schedule (Based on normal schedule and 5-day work week): ITEM DAYS ESTIMATED Preliminary Engineering Material Procurement Right of Way Acquisition Contract Negotiations (for utility/railroad work) Other Construction (actual utility/railroad relocation time at job site) ( 30 )* ESTIMATED MAXIMUM TOTAL 30 Days ADJUSTED UTILITY/RAILROAD RELOCATION PERIOD (Allow for concurrent activities) ESTIMATED MINIMUM TOTAL 15 Days * Sec Highway Contract Special Provisions D. Special Notation(s) to be included in Highway Contract Special Provisions: INSTALL HANGERS FOR 2011 WATER MAIN ON BRIDGE. E. This AGENCY proposes to commence actual relocation and/or adjustment work: (Check one) I 1 prior to highway contract advertisement, and relocation should be % complete by date of preconstruction conference. I xk concurrently with project advertisement. Elconcurrently with commencement of highway construction. The above data is based on construction plans and schedules prepared by the DEPARTMENT, and, therefore, is furnished for informational purposes only. This AGENCY is not responsible for circumstances beyond its normal control. However, the AGENCY will endeavor to fully cooperate with the DEPARTMENT, and its Contractor, in clearing the project right of way as expeditiously as possible. The AGENCY'S Field Representatives can be contacted at: •• .. - . . •. - . - ' - Telephone Number: 673-7687 SUBMITTED FOR THE AGENCY BY: —.010.6---.4 AL.------. - Date: 2//7/21/ i Frank Aymon i n, P.E. , ; 1 rec,or of •ubl orks DEPARTMENTAL APPROVAL BY: Date: District Utility Engineer ORIGINAL RESOLUTION NO. 81-16719 (Authorizing excution of agreement between the Department of Transportation and the City for placement of supports for temporary relocation of 20" water main on east bridge of MacArthur Causeway) • • t I