2019-30792 Resolution RESOLUTION NO. 2019-30792
A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF
THE CITY OF MIAMI BEACH, FLORIDA, ADOPTING THE
FIFTH AMENDMENT TO THE CAPITAL BUDGET FOR FISCAL
YEAR 2018/19.
WHEREAS, on September 26, 2018, the final Capital Improvement Plan for Fiscal Years
2018/19—2022/23 and the final Capital Budget for FY 2018/19 were adopted via Resolution No.
2018-30515; and
WHEREAS, on November 14, 2018, the First Amendment to the Capital Budget for FY
2018/19 was adopted via Resolution No. 2018-30610; and
WHEREAS, on December 12, 2018, the Second Amendment to the Capital Budget for
FY 2018/19 was adopted via Resolution No. 2018-30649; and
WHEREAS, on January 16, 2019, the Third Amendment to the Capital Budget for FY
2018/19 was adopted via Resolution No. 2019-30681; and
WHEREAS, on March 13, 2019, the Fourth Amendment to the Capital Budget for FY
2018/19 was adopted via Resolution No. 2019-30753; and
WHEREAS, pursuant to Section 166.241(4)(c) of the Florida Statutes, the City's budget
amendments must be adopted in the same manner as the original adopted budget; and
WHEREAS, further, it is recommended by the Administration that the FY 2018/19
Capital Budget be amended to increase appropriations by $131,426,000.00 as highlighted in
Attachments A, "Projects"; B, "Source of Funds"; and C, "Programs"; and to re-appropriate
$130,000.00 as highlighted in Attachment A, "Projects."
NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY
COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City
Commission hereby adopt the Fifth Amendment to the Capital Budget for Fiscal Year 2018/19
as set forth in Attachments A, "Projects"; B, "Source of Funds"; and C, "Programs."
PASSED AND ADOPTED this 10th day of April, 2019.
__,...0.0.000,„,m1p,,,,„..-
411.
ATTEST:
7Y I-1 Dan Gelber, Mayor
) tcr
Rafael E. Granada, City C erk
���..•��""klamilt�� APPROVED AS TO
if,... ..
—� 0't B��g4'4.� FORM & LANGUAGE
. ,: ...-.104kp., & OSCE UTION' C
ir i ---.),,,,,,, --.i,
W INCORP ORATED: *' City Attorney Dote
-Z.:-.;, A /p.,
y.._i1G1�:�''
ATTACHMENT A
FY 2018/19 CAPITAL BUDGET
PROJECTS
AMENDED 4/10/2019
Amended FY19 Revised Capital
' Capital Project Name Capital Budget Amended 4/10/19 Budget
Bayshore Park(Par 3/Community Park)
(Project#26319) - 15,700,000.00 15,700,000.00
PAL Facility, Flamingo Park&Youth Center
(Project it 25419) -
15,400,000.00 15,400,000.00
72nd Street Park, Library, and Aquatic Center
(Project#25019) -
10,800,000.00 10,800,000.00
Baywalk (Project#26719) - 10,000,000.00 10,000,000.00
Resilient Seawalls and Living Shorelines
(Project#27919) - 8,000,000.00 8,000,000.00
Street Pavement Program(Project#27819) - 7,500,000.00 7,500,000.00
Replace Fire Station#1 (Project#28319) - 7,000,000.00 7,000,000.00
Street Lighting Improvements(Project#69019) - 5,000,000.00 5,000,000.00
North Shore Park&Youth Center(Project#26219) - 4,930,000.00 4,930,000.00
Lummus Park (Project#25719) - 4,737,000.00 4,737,000.00
SoundscapePark(Project#26619) - 4,500,000.00 4,500,000.00
Scott Rakow Youth Center(Project#26519) - 4,448,000.00 4,448,000.00
Police Headquarters Renovations(Project#68519) - 4,000,000.00 4,000,000.00
Sidewalk Improvement Program(Project#68319) - 3,500,000.00 3,500,000.00
Maurice Gibb Park(Project#25919) - 3,300,000.00 3,300,000.00
Street Tree Master Plan(Project#68219) - 2,500,000.00 2,500,000.00
Protected Bicycle Lanes and Shared Bike/Pedestrian
- 2,500,000.00 2,500,000.00
Paths(Project#68619)
Security for Public Spaces(Project#28719) 600,000.00 1,400,000.00 2,000,000.00
North Beach Oceanside Park Beachwalk
(Project#26119) - 2,000,000.00 2,000,000.00
License Plate Readers(Project#28519) _ _ 480,000.00 1,470,000.00 1,950,000.00
41st Street Corridor(Project#28019) - 1,500,000.00 1,500,000.00
Neighborhood Traffic Calming&Pedestrian-Friendly 1,500,000.00 1,500,000.00
-
Streets(Protect#68419)
Security Cameras in Entertainment District
(Project#69219) 700,000.00 790,000.00 1,490,000.00
LED Lighting in Parks (Project#68919) - 1,041,000.00 1,041,000.00
West Lots Redevelopment(Project#27119) - 1,000,000.00 1,000,000.00
Palm&Hibiscus Neighborhood Enhancements
(Project#27419) - 1,000,000.00 1,000,000.00
Security Cameras in Business Districts
(Project#68819) - 825,000.00 825,000.00
Marjory Stoneman Douglas Park(Project#25819) - 682,000.00 682,000.00
Collins Park(Project#25119) - 640,000.00 640,000.00
Security Cameras on Beach Walk(Project#69119) - 400,000.00 400,000.00
Fairway Park(Project#25319) - 260,000.00 260,000.00
CrespiPark(Project#25219) - 211,000.00 211,000.00
Stillwater Park(Project#67819) ' - 145,000.00 145,000.00
Marine Patrol Fire/Police Facility(Project#28819) - 2,700,000.00 2,700,000.00
Beach Restrooms Paint and Concrete
(Project#63080) 240,275.00 86,000.00 326,275.00
Flamingo Park Irrigation-Baseball(Project#63219) 86,000.00 (86,000.00) -
North Beach Parks Restroom Restoration
(Project#62718) 190,000.00 91,000.00 281,000.00
Normandy Shores Shade Structure
(Project#63619) 44,000.00 (44,000.00) -
Total $ 2,340,275.00 $ 131,426,000.00 $ 133,766,275.00
NOTE:$86,000 of funding for the Beach Restrooms Paint and Concrete project will be transferred from the Flamingo Park Irrigation-
Baseball project. $44,000 of the proposed additional$91,000 of funding for the North Beach Parks Restroom Restoration project will
come from the Normandy Shores Shade Structure project.
ATTACHMENT B
FY 2018/19 CAPITAL BUDGET
SOURCE OF FUNDS
AMENDED 4/10/2019
Funding Source Amended FY19 Amended 4/10/19 Revised Capital
Capital Budget' Budget
Capital Renewal&Replacement $ 1,255,000.00 $ 1,255,000.00
Comm.Dev.Block Grant 598,046.00 598,046.00
7th Street Garage 50,000.00 50,000.00
Concurrency Mitigation Fund 6,641,000.00 6,641,000.00
RDA City Center Renewal&Replacement 138,000.00 138,000.00
RDA-Non TIF (6,865,154.00) (6,865,154.00)
3 Cent Local Options Gas Tax(LOGT) 559,000.00 559,000.00
HOME Invest Part.Prog.Grant 478,580.00 478,580.00
Half Cent Transit Surtax-Cnty 797,000.00 797,000.00
Capital Projects Financed By Other Funds 4,198,225.00 4,198,225.00
Pay As You Go-Capital Fund 3,739,585.00 47,000.00 3,786,585.00
Capital Reserve 485,213.45 485,213.45
Resort Tax-South Beach 1,311,000.00 1,311,000.00
Resort Tax-Mid Beach 1,249,000.00 1,249,000.00
Resort Tax-North Beach 796,000.00 796,000.00
MDC ILA 7,390,575.00 7,390,575.00
Line of Credit (1,630,900.00) (1,630,900.00)
RDA City Center Capital Fund 20,000,000.00 20,000,000.00
Gulf Breeze Bond Fund 15,483.69 15,483.69
1996 RCP 15M GO Bond 5,566.00 5,566.00
1999 GO Bonds Fire Safety 10,859.34 10,859.34
2003 GO Bonds Fire Safety 3,503.57 3,503.57
2003 GO Bonds Parks&Rec 46,349.00 46,349.00
2019 GO Bonds—Parks 7,980,000.00 78,753,000.00 86,733,000.00
2019 GO Bonds—Public Safety 11,780,000.00 24,626,000.00 36,406,000.00
2019 GO Bonds—Neighborhoods&Infrastructure - 28,000,000.00 28,000,000.00
Water&Sewer Projects funded from Operations 400,000.00 400,000.00
2017 Water&Sewer Bonds 3,512,500.00 3,512,500.00
2017 Storm Water Bonds 13,324,330.75 13,324,330.75
Storm Water Projects-MDC ILA 2,200,000.00 2,200,000.00
Convention Center Operating Fund 1,744,950.00 1,744,950.00
RDA Garages 100,000.00 100,000.00
Penn Garage Fund 135,000.00 135,000.00
Parking Operations (160,000.00) (160,000.00)
Parking Capital not Bonds 2,679,000.00 2,679,000.00
Fleet Management 3,030,000.00 3,030,000.00
Communications Fund 59,000.00 59,000.00
Total Appropriation as of 4/10/2019 $ 88,056,712.80 $ 131,426,000.00 $ 219,482,712.80
NOTE:$86,000 of funding for the Beach Restrooms Paint and Concrete project will be transferred from the Flamingo Park Irrigation-
Baseball project. $44,000 of the proposed additional$91,000 of funding for the North Beach Parks Restroom Restoration project will
come from the Normandy Shores Shade Structure project.
ATTACHMENT C
FY 2018/19 CAPITAL BUDGET
PROGRAMS
AMENDED 4/10/2019
Program Area Amended FY19 Amended 4/10/19 Revised Capital
Capital Budget Budget
Bridges $ 820,657.00 $ 820,657.00
Convention Center 1,500,000.00 1,500,000.00
Environmental 451,000.00 2,500,000.00 2,951,000.00
Equipment 14,328,000.00 4,885,000.00 19,213,000.00
General Public Buildings 926,805.00 9,700,000.00 10,626,805.00
Golf Courses 124,000.00 124,000.00
Lighting - 6,041,000.00 6,041,000.00
Parking Lots 341,000.00 341,000.00
Parks 7,003,500.00 78,623,000.00 85,626,500.00
Renewal&Replacement 10,412,875.60 4,177,000.00 14,589,875.60
Seawalls - 8,000,000.00 8,000,000.00
Streets/Sidewalk Improvements 33,820,875.20 13,500,000.00 47,320,875.20
Transit/Transportation 11,551,000.00 4,000,000.00 15,551,000.00
Utilities 6,777,000.00 6,777,000.00
Total Appropriation as of 4/10/2019 $ 88,056,712.80 $ 131,426,000.00 $ 219,482,712.80
NOTE:$86,000 of funding for the Beach Restrooms Paint and Concrete project will be transferred from the Flamingo Park Irrigation-
Baseball project. $44,000 of the proposed additional$91,000 of funding for the North Beach Parks Restroom Restoration project will
come from the Normandy Shores Shade Structure project.
Resolutions -R7 B
MIAMI BEACH -
COMMISSION MEMORANDUM
TO: Honorable Mayor and Members of the City Commission
FROM: Jimmy L. Morales, City Manager
DATE: April 10, 2019
2:01 p.m. Public Hearing
SUBJECT:A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY
OF MIAMI BEACH, FLORIDA, ADOPTING THE FIFTH AMENDMENT TO
THE CAPITAL BUDGET FOR FISCAL YEAR 2018/19.
RECOMMENDATION
See attached memorandum.
Legislative Tracking
Budget and Performance Improvement
ATTACHMENTS:
Description
CI MEMO - 5th Amendment to the FY19 Capital Budget
Page 755 of 1091
A I
EAC
City of Miami Beach,1700 Convention Center Drive,Miami Beach,Florida 33139,www.miamibeachfl.gov
COMMISSION MEMORANDUM
TO: Mayor Dan Gelber and Members of the City Commission
FROM: Jimmy L. Morales, City Manager
DATE: April 10, 2019
SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF
MIAMI BEACH, FLORIDA, ADOPTING THE FIFTH AMENDMENT TO THE
CAPITAL BUDGET FOR FISCAL YEAR 2018/19.
ADMINISTRATION RECOMMENDATION
Adopt the Resolution.
BACKGROUND
Planning for capital improvements is an ongoing process; as needs change within the City of
Miami Beach ("the City"), capital programs and priorities must be adjusted accordingly. The
Capital Improvement Plan ("CIP") serves as the primary planning tool for systematically
identifying, prioritizing and assigning funds to critical City capital development, improvements
and associated needs.
The City's CIP process begins in the spring when all departments are asked to prepare capital
improvement updates and requests on the department's ongoing and proposed capital projects.
Individual departments prepare submittals identifying potential funding sources and requesting
commitment of funds for their respective projects.
The CIP is updated annually and submitted to the City Commission for adoption. The 2018/19—
2022/23 Capital Improvement Plan and FY 2018/19 Capital Budget was adopted on September
26, 2018 by Resolution 2018-30515.
The First Amendment to the FY 2018/19 Capital Budget was approved on November 14, 2018
by Resolution 2018-30610. The Second Amendment to the FY 2018/19 Capital Budget was
approved on December 12, 2018 by Resolution 2018-30649. The Third Amendment to the FY
2018/19 Capital Budget was approved on January 16, 2019 by Resolution 2019-30681. The
Fourth Amendment to the FY 2018/19 Capital Budget was approved on March 13, 2019 by
Resolution 2019-30753.
Section 166.241(4) (c.), Florida Statutes, requires that a municipality's budget amendment must
be adopted in the same manner as the original budget. The Administration recommends
adopting the Resolution for the Fifth Amendment to the FY 2018/19 Capital Budget.
Page 756 of 1091
Resolution Adopting the Fifth Amendment to the Capital Budget for FY 2018/19
April 10, 2019
Page 2 of 12
FIFTH AMENDMENT TO THE FY 2018/19 CAPITAL BUDGET
The Fifth Amendment to the FY 2018/19 Capital Budget totals an increase of$131,426,000.00
and re-alignment of $130,000.00 in order to provide additional funding for, and to reallocate
funding between the following capital projects:
On November 6, 2018, the citizens of the City of Miami Beach voted in favor of issuing $439
million in general obligation bonds ("G.O. Bonds") to:
• Improve the City's police, fire, and public safety facilities, in addition to equipment,
technology, and lighting to improve security throughout the City
• Improve the City's parks, recreational and cultural facilities, inclusive of playgrounds,
baywalks, beachwalks, waterways, landscaping, equipment, lighting, security, and
parking related to such facilities
• Improve the City's neighborhoods and infrastructure, including stormwater and
flooding mitigation projects, sidewalk and street renovation and repairs, protected
bicycle lanes, pedestrian paths, landscaping, and lighting
At the March 13, 2019 Commission Meeting, the City Commission approved the G.O. Bond
execution plan for the first tranche and authorized the issuance of General Obligation Bonds,
Series 2019, for the funding of these projects. The fourth amendment to the FY 2018/19 Capital
Budget, which was approved at this meeting, allowed for the expedited funding of seven of
these approved first tranche projects in the amount of $19,760,000.00. This proposed Capital
Budget amendment would allow for the funding of the remaining $131,379,000.00 of tranche 1
projects.
1. Bayshore Park (Former Par 3 / Community Park): This project provides funding
for the completion of the conversion of the former golf course into a passive park at
2795 Prairie Avenue, with elements such as: lake, overlooks, and amphitheater;
tennis courts; playground; vita course &trail system; environmental remediation; and
resiliency components.
Funding for this proposed amendment would come from the 2019 GO Bonds— Parks
(Fund 391) in the amount of$15,700,000.00.
Prior Years'Appropriations $ 0.00
April 10, 2019 Budget Amendment 15,700,000.00
Proposed Total Appropriations $ 15,700,000.00
2. PAL Facility, Flamingo Park & Youth Center: This project includes the
replacement of the Police Athletic League (PAL) Recreation Center at 1200 Meridian
Avenue with a new 30,000 square foot facility including a basketball gym, indoor
running track, fitness center, locker rooms, community meeting rooms, classrooms,
master plan improvements, and resiliency enhancements. r
Funding for this proposed amendment would come from the 2019 GO Bonds— Parks
(Fund 391) in the amount of $15,400,000.00. The remaining $15,150,000.00
budgeted for this project is currently scheduled to be appropriated upon approval of
tranche 3 funding.
Page 757 of 1091
Resolution Adopting the Fifth Amendment to the Capital Budget for FY 2018/19
April 10, 2019
Page 3 of 12
Prior Years' Appropriations $ 0.00
April 10, 2019 Budget Amendment 15,400,000.00
Proposed Total Appropriations $ 15,400,000.00
3. 72nd Street Park, Library, and Aquatic Center: This project includes the building
of a new facility at 72nd Street between Collins Avenue and Harding Avenue that
includes a recreational park space, roof-top competition pool, library/media center,
fitness gym with running track, and parking garage.
• Funding for this proposed amendment would come from the 2019 GO Bonds— Parks
(Fund 391) in the amount of $10,800,000.00. The remaining $43,000,000.00
budgeted for this project is currently scheduled to be appropriated upon approval of
tranche 2 funding.
Prior Years' Appropriations $ 0.00
April 10, 2019 Budget Amendment 10,800,000.00
Proposed Total Appropriations $ 10,800,000.00
4. Baywalk: This project would create a continuous pedestrian path along Biscayne
Bay from Government Cut to Lincoln Road, by connecting the gaps in the existing
public Baywalk, including pedestrian bridge connection over 5th Street.
Funding for this proposed amendment would come from the 2019 GO Bonds —Parks
(Fund 391) in the amount of $10,000,000.00. The remaining $5,000,000.00
budgeted for this project is currently scheduled to be appropriated upon approval of
tranche 2 funding.
Prior Years'Appropriations $ 0.00
April 10, 2019 Budget Amendment 10,000,000.00
Proposed Total Appropriations $ 10,000,000.00
5. Resilient Seawalls and Living Shorelines: This project includes the raising of city-
owned seawalls to a minimum height standard in high priority areas and where
feasible and incorporating living seawalls through natural vegetation and habitat
enhancement.
Funding for this proposed amendment would come from the 2019 GO Bonds —
Neighborhoods & Infrastructure (Fund 393) in the amount of $8,000,000.00. The
remaining $2,000,000.00 budgeted for this project is currently scheduled to be
appropriated upon approval of tranche 2 funding.
Prior Years' Appropriations $ 0.00
April 10, 2019 Budget Amendment 8,000,000.00
Proposed Total Appropriations $ 8,000,000.00
6. Street Pavement Program: This project would allow'for the enhancement of the
City's pavement condition by resurfacing streets and implementing pavement
preservation strategies.
Funding for this proposed amendment would come from the 2019 GO Bonds —
Neighborhoods & Infrastructure (Fund 393) in the amount of $7,500,000.00 for
Page 758 of 1091
Resolution Adopting the Fifth Amendment to the Capital Budget for FY 2018/19
April 10,2019
Page 4 of 12
tranche 1. The remaining $22,500,000.00 budgeted for this project is currently
scheduled to be appropriated upon approval of tranches 2 through 4 funding.
Prior Years'Appropriations $ 0.00
April 10, 2019 Budget Amendment 7,500,000.00
Proposed Total Appropriations $ 7,500,000.00
7. Replace Fire Station #1: This project includes the replacement of Fire Station #1,
located at 1051 Jefferson Avenue in South Beach. This station provides emergency
assistance to the area south of 15th Street, Star Island, Palm Island, Hibiscus Island,
among other areas, and will also house the 911 Call Center.
Funding for this proposed amendment would come from the 2019 GO Bonds —
Public Safety (Fund 392) in the amount of $7,000,000.00 for tranche 1. The
remaining $3,000,000.00 budgeted for this project is currently scheduled to be
appropriated upon approval of tranche 2 funding.
Prior Years'Appropriations $ 0.00
April 10, 2019 Budget Amendment 7,000,000.00
Proposed Total Appropriations $ 7,000,000.00
8. Street Lighting Improvements: This project includes the implementation of a
citywide street lighting program using energy efficient LED lights, to increase lighting
levels and improve security throughout the City.
Funding for this proposed amendment would come from the 2019 GO Bonds —
Public Safety (Fund 392) in the amount of $5,000,000.00. The remaining
$5,000,000.00 budgeted for this project is currently scheduled to be appropriated
upon approval of tranche 2 funding.
Prior Years'Appropriations $ 0.00
April 10, 2019 Budget Amendment 5,000,000.00
Proposed Total Appropriations $ 5,000,000.00
9. North Shore Park&Youth Center: This project allows for the improvement of North
Shore Park and Youth Center located at 501 72nd Street, including the addition of two
baseball fields, an emergency generator, playground replacement, baseball field
conversion to artificial turf and lighting upgrades, roof replacement, new
walking/jogging path, and security cameras.
Funding for this proposed amendment would come from the 2019 GO Bonds— Parks
(Fund 391) in the amount of $4,930,000.00. The remaining $795,000.00 budgeted
for this project is currently scheduled to be appropriated upon approval of tranche 2
funding.
Prior Years'Appropriations $ 0.00
April 10, 2019 Budget Amendment 4,930,000.00
Proposed Total Appropriations $4,930,000.00
Page 759 of 1091
Resolution Adopting the Fifth Amendment to the Capital Budget for FY 2018/19
April 10,2019
Page 5 of 12
10. Lummus Park: This project includes improvements to the park located at 1130
Ocean Drive, including landscaping, sod, irrigation, restrooms, upgrade of pathways
similar to South Pointe Park, new wayfinding signage, and tree planting.
Funding for this proposed amendment would come from the 2019 GO Bonds— Parks
(Fund 391) in the amount of$4,737,000.00.
Prior Years'Appropriations $ 0.00
April 10, 2019 Budget Amendment 4,737,000.00
Proposed Total Appropriations $4,737,000.00
11. Soundscape Park: This project includes the improvement of public amenities for the
park located at 400 17th Street, including a permanent restroom/storage facility and
the upgrade of projectors, cameras, and servers to 4K ultra-high definition resolution
in order to enhance the delivery of free cultural activities.
Funding for this proposed amendment would come from the 2019 GO Bonds— Parks
(Fund 391) in the amount of$4,500,000.00.
Prior Years'Appropriations $ 0.00
April 10, 2019 Budget Amendment 4,500,000.00
Proposed Total Appropriations $ 4,500,000.00
12. Scott Rakow Youth Center: This project allows for improvements at Scott Rakow
Youth Center located at 2700 Sheridan, including: roof replacement, renovations to
pool facilities, basketball floor replacement, window replacements, emergency
generator, HVAC replacement, and security cameras.
Funding for this proposed amendment would come from the 2019 GO Bonds— Parks
(Fund 391) in the amount of $4,448,000.00. The remaining $640,000.00 budgeted
for this project is currently scheduled to be appropriated upon approval of tranche 2
funding.
Prior Years'Appropriations $ 0.00
April 10, 2019 Budget Amendment 4,448,000.00
Proposed Total Appropriations $4,448,000.00
13. Police Headquarters Renovations: This project includes the renovation of the
Police Headquarters at 1100 Washington Avenue, to include infrastructural upgrades
of the fire alarm and sprinkler systems, generators, HVAC systems, electrical
systems, and the indoor shooting range used by police officers for training and safety
certification.
Funding for this proposed amendment would come from the 2019 GO Bonds —
Public Safety (Fund 392) in the amount of $4,000,000.00 for tranche 1. The
remaining $6,000,000.00 budgeted for this project is currently scheduled to be
appropriated upon approval of tranche 3 funding.
Prior Years'Appropriations $ 0.00
April 10, 2019 Budget Amendment 4,000,000.00
Proposed Total Appropriations $4,000,000.00
Page 760 of 1091
Resolution Adopting the Fifth Amendment to the Capital Budget for FY 2018/19
April 10, 2019
Page 6 of 12 •
14. Sidewalk Improvement Program: This project allows for the improvement in
walkability by replacing 25% of the City's sidewalks that are rated at or below
marginal per the City's Sidewalk Condition Index.
Funding for this proposed amendment would come from the 2019 GO Bonds —
Neighborhoods & Infrastructure (Fund 393) in the amount of $3,500,000.00. The
remaining $9,500,000.00 budgeted for this project is currently scheduled to be
appropriated upon approval of tranches 2 through 4 funding.
Prior Years'Appropriations $ 0.00
April 10, 2019 Budget Amendment 3,500,000.00
Proposed Total Appropriations $ 3,500,000.00
15. Maurice Gibb Park: This project includes improvements to the park located at 18th
Street and Purdy Avenue, including soil remediation, new landscaping, irrigation,
signage, benches, playground replacement, fitness circuit, and resiliency elements.
Funding for this proposed amendment would come from the 2019 GO Bonds— Parks
(Fund 391) in the amount of$3,300,000.00.
Prior Years'Appropriations $ 0.00
April 10, 2019 Budget Amendment 3,300,000.00
Proposed Total Appropriations $ 3,300,000.00
16.Street Tree Master Plan: This project allows for the implementation of the Street
Tree Master Plan by planting 3,500 to 5,000 trees to provide canopy coverage and
shade, while also providing additional storm water treatment and storage capacity.
Funding for this proposed amendment would come from the 2019 GO Bonds —
Neighborhoods & Infrastructure (Fund 393) in the amount of $2,500,000.00. The
remaining $2,500,000.00 budgeted for this project is currently scheduled to be
appropriated upon approval of tranche 2 funding.
Prior Years'Appropriations $ 0.00
April 10, 2019 Budget Amendment 2,500,000.00
Proposed Total Appropriations $ 2,500,000.00
17. Protected Bicycle Lanes and Shared Bike/Pedestrian Paths: This project will
encourage pedestrian and bicycle friendly transportation by creating protected
bicycle lanes and shared-use paths including: Chase Avenue from Alton Road to 34th
Street, 23rd Street, and 63rd Street.
•
Funding for this proposed amendment would come from the 2019 GO Bonds —
Neighborhoods & Infrastructure (Fund 393) in the amount of $2,500,000.00. The
remaining $2,500,000.00 budgeted for this project is currently scheduled to be
appropriated upon approval of tranches 2 through 3 funding.
Prior Years'Appropriations $ 0.00
April 10, 2019 Budget Amendment 2,500,000.00
Proposed Total Appropriations $2,500,000.00
Page 761 of 1091
Resolution Adopting the Fifth Amendment to the Capital Budget for FY 2018/19
April 10, 2019
Page 7 of 12
18. Security for Public Spaces: This project includes the installation of protective
bollard systems to safeguard pedestrians and special event venues at: Miami Beach
Convention Center, Lincoln Road, Ocean Drive, SoundScape Park, and South
Pointe Park.
The City Commission approved funding $600,000.00 of this project's budget on
March 13, 2019 to allow for immediate commencement of work. This proposed
budget amendment would allow for additional funding of this project in tranche 1.
Funding for this proposed amendment would come from the 2019 GO Bonds —
Public Safety (Fund 392), in the amount of $1,400,000.00. The remaining
$2,350,000.00 budgeted for this project is currently scheduled to be appropriated
upon approval of tranche 2 funding.
Prior Years'Appropriations $ 600,000.00
April 10, 2019 Budget Amendment 1,400,000.00
Proposed Total Appropriations $2,000,000.00
19. North Beach Oceanside Park Beachwalk: This project includes the completion of
the final link in the Beachwalk from South Pointe to the northern boundary of the city
by extending the Beachwalk from 79th to 87th Street.
Funding for this proposed amendment would come from the 2019 GO Bonds— Parks
(Fund 391) in the amount of$2,000,000.00.
Prior Years'Appropriations $ 0.00
April 10, 2019 Budget Amendment 2,000,000.00
Proposed Total Appropriations $2,000,000.00
20. License Plate Readers: This project includes the installation of License Plate
Readers (LPRs) at 26 strategic locations throughout the City, in order to augment
crime-fighting and prevention efforts.
The City Commission approved funding $480,000.00 of this project's budget on
March 13, 2019 to allow for immediate commencement of work. This proposed
budget amendment would allow for additional funding of this project in tranche 1.
Funding for this proposed amendment would come from the 2019 GO Bonds —
Public Safety(Fund 392), in the amount of$1,470,000.00.
Prior Years' Appropriations $480,000.00
April 10, 2019 Budget Amendment 1,470,000.00
Proposed Total Appropriations $ 1,950,000.00
21.41st Street Corridor: This project includes the creation of vibrant commercial
revitalization enhancements to the 41St Street corridor, such as lighting, increased
tree canopies, sidewalk expansion, and shade structures.
Funding for this proposed amendment would come from the 2019 GO Bonds —
Neighborhoods & Infrastructure (Fund 393) in the amount of $1,500,000.00. The
remaining $13,500,000.00 budgeted for this project is currently scheduled to be
appropriated upon approval of tranches 2 through 4 funding.
Page 762 of 1091
Resolution Adopting the Fifth Amendment to the Capital Budget for FY 2018/19
April 10,2019
Page 8 of 12
Prior Years'Appropriations $ 0.00
April 10, 2019 Budget Amendment 1,500,000.00
Proposed Total Appropriations $ 1,500,000.00
22. Neighborhood Traffic Calming & Pedestrian-Friendly Streets: This project
intends to promote pedestrian and bicycle safety by implementing various traffic
calming projects in neighborhoods including: Nautilus, Bayshore, Normandy Isle, and
Palm View.
Funding for this proposed amendment would come from the 2019 GO Bonds —
Neighborhoods & Infrastructure (Fund 393) in the amount of $1,500,000.00. The
remaining $500,000.00 budgeted for this project is currently scheduled to be
appropriated upon approval of tranche 2 funding.
Prior Years'Appropriations $ 0.00
April 10, 2019 Budget Amendment 1,500,000.00
Proposed Total Appropriations $ 1,500,000.00
23. Security Cameras in Entertainment District: This project includes the addition of
72 security cameras to the existing 14 cameras within the Entertainment District.
Two cameras will be installed at every intersection of both Collins and Washington
Avenues, from 5th Street to 17th Street.
The City Commission approved funding $700,000.00 of this project's budget on
March 13, 2019 to allow for immediate commencement of work. This proposed
budget amendment would allow for additional funding of this project in tranche 1.
Funding for this proposed amendment would come from the 2019 GO Bonds —
Public Safety(Fund 392), in the amount of$790,000.00.
Prior Years'Appropriations $ 700,000.00
April 10, 2019 Budget Amendment 790,000.00
Proposed Total Appropriations $ 1,490,000.00
24. LED Lighting in Parks: This project includes the upgrade of sports and pathway
lighting to LED technology to improve illumination of areas and reduce energy costs
at the following parks: Flamingo Park, North Shore Park & Youth Center, Normandy
Isle Park, Tatum Park, Stillwater Park, and Crespi Park.
Funding for this proposed amendment would come from the 2019 GO Bonds —
Public Safety (Fund 392) in the amount of $1,041,000.00. The remaining
$3,459,000.00 budgeted for this project is currently scheduled to be appropriated
upon approval of tranche 2 funding.
Prior Years'Appropriations $ 0.00
April 10, 2019 Budget Amendment 1,041,000.00
Proposed Total Appropriations $ 1,041,000.00
25.West Lots Redevelopment: This project includes the creation of cohesive and
vibrant parks and/or recreational space as part of the redevelopment of city-owned
property known as the "West Lots", consisting of 8 blocks located in North Beach on
the west side of Collins Avenue across from North Beach Oceanside Park.
Page 763 of 1091
Resolution Adopting the Fifth Amendment to the Capital Budget for FY 2018/19
April 10,2019
Page 9 of 12
Funding for this proposed amendment would come from the 2019 GO Bonds— Parks
(Fund 391) in the amount of$1,000,000.00. The remaining $4,000,000.00 budgeted
for this project is currently scheduled to be appropriated upon approval of tranches 2
through 3 funding.
Prior Years'Appropriations $ 0.00
April 10, 2019 Budget Amendment 1,000,000.00
Proposed Total Appropriations $ 1,000,000.00
26. Palm & Hibiscus Neighborhood Enhancements: This project includes the
improvement of landscaping along Palm Avenue, portions of Fountain Street (not
water front), Palm Avenue median, and other areas.
Funding for this proposed amendment would come from the 2019 GO Bonds —
Neighborhoods & Infrastructure (Fund 393) in the amount of$1,000,000.00.
Prior Years'Appropriations $ 0.00
April 10, 2019 Budget Amendment 1,000,000.00
Proposed Total Appropriations $ 1,000,000.00
27. Security Cameras in Business Districts: This project includes enhancement of
public safety along primary business corridors city by adding 80 security cameras at:
Alton Road - 5th to Michigan Avenue and along Dade Boulevard to Washington
Avenue; 41St Street - Alton Road to Collins Avenue; and 71St Street - Bay Drive to
Collins Avenue.
Funding for this proposed amendment would come from the 2019 GO Bonds —
Public Safety (Fund 392) in the amount of$825,000.00.
Prior Years'Appropriations $ 0.00
April 10, 2019 Budget Amendment 825,000.00
Proposed Total Appropriations $ 825,000.00
28. Marjory Stoneman Douglas Park: This project includes the implementation of
various improvements to the park located at Ocean Drive and 2nd Street, including
playground replacement, sidewalk upgrade, quick release shade structure, and
turtle-friendly lighting.
Funding for this proposed amendment would come from the 2019 GO Bonds—Parks
(Fund 391) in the amount of$682,000.00.
Prior Years'Appropriations $ 0.00
April 10, 2019 Budget Amendment 682,000.00
Proposed Total Appropriations $ 682,000.00
29. Collins Park: This project includes the installation of new pavers for walkways and
plaza throughout the park located at 2100 Collins Avenue, to improve aesthetics and
reduce ongoing repairs and maintenance.
Page 764 of 1091
Resolution Adopting the Fifth Amendment to the Capital Budget for FY 2018/19
April 10, 2019
Page 10 of 12
Funding for this proposed amendment would come from the 2019 GO Bonds— Parks
(Fund 391) in the amount of$640,000.00.
Prior Years' Appropriations $0.00
April 10, 2019 Budget Amendment 640,000.00
Proposed Total Appropriations $ 640,000.00
30. Security Cameras on Beach Walk: This project allows for the enhancement of
security for residents and visitors along the Beach Walk from 14th Place to 23° Street
by adding 15 security cameras.
Funding for this proposed amendment would come from the 2019 GO Bonds —
Public Safety(Fund 392) in the amount of$400,000.00.
Prior Years'Appropriations $0.00
April 10, 2019 Budget Amendment 400,000.00
Proposed Total Appropriations $ 400,000.00
31. Fairway Park: This project includes the implementation of various improvements to
the park located at 200 Fairway Drive, including fence replacement and painting of
the pavilion, office, and restrooms.
Funding for this proposed amendment would come from the 2019 GO Bonds— Parks
(Fund 391) in the amount of$260,000.00.
Prior Years'Appropriations $ 0.00
April 10, 2019 Budget Amendment 260,000.00
Proposed Total Appropriations .260,000.00
32. Crespi Park: This project includes the implementation of various improvements to
the park at 7801 Crespi Boulevard, including a new walking/jogging path, fence
replacement, and new paint and flooring to the building and restrooms.
Funding for this proposed amendment would come from the 2019 GO Bonds— Parks
(Fund 391) in the amount of$211,000.00.
Prior Years'Appropriations $ 0.00
April 10, 2019 Budget Amendment 211,000.00
Proposed Total Appropriations $ 211,000.00
33.Stillwater Park: This project includes the implementation of various improvements to
the park located at 8440 Hawthorne Avenue, including fence replacement and new
paint and flooring for the building and restrooms.
Funding for this proposed amendment would come from the 2019 GO Bonds— Parks
(Fund 391) in the amount of$145,000.00.
Prior Years' Appropriations $ 0.00
April 10, 2019 Budget Amendment 145,000.00
Proposed Total Appropriations $ 145,000.00
Page 765 of 1091
Resolution Adopting the Fifth Amendment to the Capital Budget for FY 2018/19
April 10, 2019
Page 11 of 12
34. Marine Patrol Fire/Police Facility: This project includes the replacement of the
existing marine patrol facility at Maurice Gibb Park to relocate the Fire Patrol Boat
from North Beach, to a more central location to improve response times to
emergency calls.
Funding for this proposed amendment would come from the 2019 GO Bonds —
Public Safety (Fund 392) in the amount of$2,700,000.00.
Prior Years'Appropriations $ 0.00
April 10, 2019 Budget Amendment 2,700,000.00
Proposed Total Appropriations $ 2,700,000.00
35. Beach Restrooms Paint and Concrete: At the March 22, 2019 Finance and
Citywide Projects Committee ("FCWPC") meeting, the Committee recommended
additional funding for the Beach Restrooms Paint and Concrete project in order to
fully fund the renovation of beachfront restrooms. The work that will be completed
consists of: interior/exterior painting, replacement of existing toilets, plumbing
fixtures, toilet partitions and new epoxy flooring. The restrooms' current appearance
and condition have deteriorated beyond what could be accomplished through routine
cleaning and maintenance. The City currently receives lower than desired scores on
the City's Cleanliness Index Report due to the aging infrastructure. This restoration
will improve scores drastically, improve user experience, raise Cleanliness Index
Scores, and extend the useful life of these assets.
Funding for this proposed amendment would come from the transfer of funds
previously appropriated to the project outlined below:
• Flamingo Park Irrigation - $86,000.00 — Pay As You Go (PAYGO) Fund 302
(Project has been completed using operating funds)
Prior Years'Appropriations $ 240,275.00
April 10, 2019 Budget Amendment 86,000.00
Proposed Total Appropriations $ 326,275.00
36. North Beach Parks Restroom Restoration At the March 22, 2019 Finance and
Citywide Projects Committee ("FCWPC") meeting, the Committee recommended
additional funding for the North Beach Parks Restroom Restoration project in order
to fully fund the renovation of North Beach parks' restrooms. The work that will be
completed consists of: interior/exterior painting, replacement of existing toilets,
plumbing fixtures, toilet partitions and new epoxy flooring. The restrooms' current
appearance and condition have deteriorated beyond what could be accomplished
through routine cleaning and maintenance. The City currently receives lower than
desired scores on the City's Cleanliness Index Report due to the aging infrastructure.
This restoration will improve scores drastically, improve user experience, raise
Cleanliness Index Scores, and extend the useful life of these assets.
Funding for this proposed amendment would come from the PAYGO fund balance
(Fund 302), in the amount of $47,000, in addition to the transfer of funds previously
appropriated to the project outlined below:
• Normandy Shores Shade Structure - $44,000.00— PAYGO Fund 302 (Shade
is in good condition and was replaced after Hurricane Irma)
Page 766 of 1091
Resolution Adopting the Fifth Amendment to the Capital Budget for FY 2018/19
April 10, 2019
Page 12 of 12
Prior Years' Appropriations $ 190,000.00
April 10, 2019 Budget Amendment 91,000.00
Proposed Total Appropriations $ 281,000.00
JLM/JW/TOS
Page 767 of 1091