Contract with Florida Construction & Engineering Inc. MIAMIBEACH F 2- 13- 11 CONTRACT THIS CONTRACT is by and between the City of Miami Beach, Florida, a municipal corporation of the State of Florida, ("City"), and Florida Construction & Engineering Inc.,155 Bentley Drive, Miami Springs, FL. 33166 ("Contractor"). WITNESSETH, that Contractor and City, for the considerations hereinafter named, agree as follows: ARTICLE 1 SCOPE OF WORK Contractor hereby agrees to furnish all of the labor, materials, equipment services and incidentals necessary to perform all of the Work described in the Contract Documents and related thereto for Bid Location 1, the 17th Street Parking Garage, located at 640 17th Street, Miami Beach (the "Project"). ARTICLE 2 CONTRACT TIME 2.1 Contractor shall be instructed to commence the Work by written instructions in the form of a Notice to Proceed issued by the Contract Administrator. Two (2) Notices to Proceed will be issued for this Contract. Contractor shall commence scheduling activities, permit applications and other preconstruction work within five (5) calendar days after the Project Initiation Date, which shall be the same as the date of the first Notice to Proceed. The first Notice to Proceed will not be issued until Contractor's submission to City of all required documents (including but not limited to: Payment and Performance Bonds, and Insurance Certificate) and after execution of the Contract by both parties. 2.1.1. The receipt of all necessary permits by Contractor and acceptance of the full progress schedule in accordance with technical specifications section, submittal schedule and schedule of values is a condition precedent to the issuance of a second Notice to Proceed to mobilize on the Project site and commence with physical construction of the Work. The Contractor shall submit all necessary documents required by this provision within twenty-one (21) calendar days of the issuance of the first Notice to Proceed. 2.2 Time is of the essence throughout this Contract. This project shall be substantially completed within one hundred fifty (150) calendar days from the issuance of the first Notice to Proceed, and completed and ready for final payment in accordance with Article 5 within thirty (30) calendar days from the date certified by Consultant as the date of Substantial Completion. 2.3 Upon failure of Contractor to substantially complete the Contract within the specified period of time, plus approved time extensions, Contractor shall pay to City the sum of five hundred dollars ($500.00) for each calendar day after the time specified in Section ITB 2018-232-ZD Waterproofing, Traffic Coating Services for Parking Garage Decks 17th Street Garage (Individual Projects) Page 1 2.2 above, plus any approved time extensions, for Substantial Completion. After Substantial Completion should Contractor fail to complete the remaining work within the time specified in Section 2.2 above, plus approved time extensions thereof, for completion and readiness for final payment, Contractor shall pay to City the sum of five hundred dollars ($500.00) for each calendar day after the time specified in Section 2.2 above, plus any approved extensions, for completion and readiness for final payment. These amounts are not penalties but are liquidated damages to City for its inability to obtain full beneficial occupancy and/or use of the Project. Liquidated damages are hereby fixed and agreed upon between the parties, recognizing the impossibility of precisely ascertaining the amount of damages that will be sustained by City as a consequence of such delay, and both parties desiring to obviate any question of dispute concerning the amount of said damages and the cost and effect of the failure of Contractor to complete the Contract on time. The above-stated liquidated damages shall apply separately to each portion of the Project for which a time for completion is given. 2.4 City is authorized to deduct liquidated damages from monies due to Contractor for the Work under this Contract or as much thereof as City may, in its sole discretion, deem just and reasonable. 2.5 Contractor shall be responsible for reimbursing City, in addition to liquidated damages, for all costs incurred by Consultant in administering the construction of the Project beyond the completion date specified above, plus approved time extensions. Consultant construction administration costs shall be pursuant to the contract between City and Consultant, a copy of which is available upon request of the Contract Administrator. All such costs shall be deducted from the monies due Contractor for performance of Work under this Contract by means of unilateral credit change orders issued by City as costs are incurred by Consultant and agreed to by City. ARTICLE 3 THE CONTRACT SUM [ ] This is a Unit Price Contract:* 3.1 City shall pay to Contractor the amounts determined for the total number of each of the units of work completed at the unit price stated in the schedule of prices bid. The number of units contained in this schedule is an estimate only, and final payment shall be made for the actual number of units incorporated in or made necessary by the Work covered by the Contract Documents. 3.2 Payment shall be made at the unit prices applicable to each integral part of the Work. These prices shall be full compensation for all costs, including overhead and profit, associated with completion of all the Work in full conformity with the requirements as stated or shown, or both, in the Contract Documents. The cost of any item of work not covered by a definite Contract unit price shall be included in the Contract unit price or lump sum price to which the item is most applicable. ITB 2018-232-ZD Waterproofing, Traffic Coating Services for Parking Garage Decks 17th Street Garage (Individual Projects) Page 2 [X] This is a Lump Sum Price Contract:* 3.1 City shall pay to Contractor for the performance of the Work described in the Contract Documents, the total price stated as awarded. 3.2 The Contract Price is $703,315.00, consisting of a base bid in the amount of $653,315.00.00, and a separate line item in the amount of $40,000.00 for Permits Allowance and a separate line item in the amount of $10,000.00 for the Owner's Contingency (to be used solely by the City at its sole discretion for the purposes described in the Contract Documents). The Contract Price, excluding the Owner's Contingency and permits allowance, shall be full compensation for all labor, materials, equipment, costs, and expenses, including overhead and profit, associated with completion of all the Work accordance with the requirements of the Contract Documents, including all Work reasonably inferable therefrom, even if such item of Work is not specifically or expressly identified as part of a line item in the ITB Price Form. *Note: Some projects include both unit prices and lump sums in which case both sections shall apply to the Work identified for each type of Contract. ARTICLE 4 PROGRESS PAYMENTS 4.1 Contractor may make Application for Payment for work completed during the Project at intervals of not more than once a month. Contractor's application shall show a complete breakdown of the Project components, the quantities completed and the amount due, together with such supporting evidence as may be required by Consultant and City. Contractor shall include, but same shall not be limited to, with each Application for Payment, an updated progress schedule acceptable to Consultant as required by the Contract Documents and a release of liens and consent of surety relative to the Work which is the subject of the Application for Payment. Following submission of an acceptable updated progress schedule and the other documents required herein a log with the Application for Payment, City shall make payment to Contractor after approval by Consultant of an Application for Payment, less retainage as herein provided for and/or withholding of any other amounts pursuant to the Contract Documents, within twenty-five (25) days in accordance with Section 218.735 of the Florida Statutes. 4.2 The City shall withhold from each progress payment made to Contractor retainage in the amount of ten percent (10%) of each such payment until fifty percent (50%) of the Work has been completed. The Work shall be considered 50% complete at the point at which the City has expended 50% of the approved Cost of the Work together with all costs associated with existing change orders or other additions or modifications to the construction services provided for in this Agreement. Thereafter, the Contract Administrator shall reduce to five percent (5%) the amount of retainage withheld from each subsequent progress payment made to the Contractor, until Substantial Completion as provided in ITB Section 0500, Sub-Section 43. Any reduction in retainage shall be in accordance with Section 255.078 of the Florida Statutes, as may be amended, and shall otherwise be at the sole discretion of the Contract Administrator, after considering any recommendation of Consultant with ITB 2018-232-ZD Waterproofing, Traffic Coating Services for Parking Garage Decks 17th Street Garage (Individual Projects) Page 3 respect thereto. Contractor shall have no entitlement to a release of, or reduction in, retainage, except as may be required herein or by Florida law. Any interest earned on retainage shall accrue to the benefit of City. All requests for retainage reduction shall be in writing in a stand-alone document, separate from monthly applications for payment. All requests for release of retainage shall be made in accordance with, and shall be subject to, the requirements of Section 255.078 of the Florida Statutes, as may be amended. Except as provided by law, the City shall have no obligation to release or disburse retainage until Substantial Completion of the Project. Upon receipt by the Contractor of a Certificate of Substantial Completion pursuant to ITB Section 0500, Sub- Section 43, fully executed by the City establishing the Date of Substantial Completion, and after completion of all items on the punch list and/or other incomplete work, the Contractor may submit a payment request for all remaining retainage. It shall be the City's sole determination as to whether any of the items have been completed. For items deemed not to have been completed, the City may withhold retainage up to one and one-half times the total cost to complete such items. Any interest earned on retainage shall accrue to the benefit of City. City shall disburse the amounts withheld upon the City's acceptance of the completion of the items for which they were withheld. 4.3 City may withhold, in whole or in part, payment to such extent as may be necessary to protect itself from loss on account of: 4.3.1 Defective work not remedied. 4.3.2 Claims filed or reasonable evidence indicating probable filing of claims by other parties against Contractor or City because of Contractor's performance. 4.3.3 Failure of Contractor to make payments properly to Subcontractors or for material or labor. 4.3.4 Damage to another contractor not remedied. 4.3.5 Liquidated damages and costs incurred by Consultant for extended construction administration. 4.3.6 Failure of Contractor to provide any and all documents required by the City. When the above grounds are removed or resolved satisfactory to the Contract Administrator, payment shall be made in whole or in part. ARTICLE 5 ACCEPTANCE AND FINAL PAYMENT 5.1 Upon receipt of written notice from Contractor that the Work is ready for final inspection and acceptance, Consultant shall, within ten (10) calendar days, make an inspection thereof. If Consultant and Contract Administrator find the Work acceptable, the requisite documents have been submitted and the requirements of the Contract Documents fully satisfied, and all conditions of the permits and regulatory agencies have been met, a Final Certificate of Payment (ITB Attachment D-6) shall be issued by Consultant, over its ITB 2018-232-ZD Waterproofing, Traffic Coating Services for Parking Garage Decks 17th Street Garage (Individual Projects) Page 4 signature, stating that the requirements of the Contract Documents have been performed and the Work is ready for acceptance under the terms and conditions thereof. 5.2 Before issuance of the Final Certificate for Payment, Contractor shall deliver to Consultant a complete release of all liens arising out of this Contract; a consent of surety to final payment; the final corrected as-built drawings; an affidavit certifying that all suppliers and subcontractors have been paid in full and that all other indebtedness connected with the Work has been paid; and the final bill of materials, if required, and invoice. 5.3 If, after the Work has been substantially completed, full completion thereof is materially delayed through no fault of Contractor, and Consultant so certifies, City shall, upon certificate of Consultant, and without terminating the Contract, make payment of the balance due for that portion of the Work fully completed and accepted. Such payment shall be made under the terms and conditions governing final payment, except that it shall not constitute a waiver of claims. 5.4 Final payment shall be made only after the City Manager or his designee has reviewed a written evaluation of the performance of Contractor prepared by the Contract Administrator, and approved the final payment. The acceptance of final payment shall constitute a waiver of all claims by Contractor, except those previously made in strict accordance with the provisions of the General Conditions and identified by Contractor as unsettled at the time of the application for final payment. ARTICLE 6 — MISCELLANEOUS 6.1 The requirements of the Contract Documents, as such term is defined in the Invitation to Bid, are hereby incorporated by reference as if fully set forth herein. This Contract is part of, and incorporated in, the Contract Documents as defined herein. Accordingly, all of the documents incorporated by the Contract Documents shall govern this Project. 6.2 Where there is a conflict between any provision set forth within the Contract Documents and a more stringent provision elsewhere in the Contract Documents or under any law, regulation, statute or code requirement which is applicable to this Project, the more stringent provision shall prevail and govern the performance of the Work. 6.3 Public Entity Crimes Contractor acknowledges that the provisions of the Public Entity Crimes Act, Section 287.133, Florida Statutes, shall apply to this Contract, which statute provides, in pertinent part, that a person or affiliate who is a contractor, consultant or other provider, who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a bid on a contract to provide any goods or services to the City, may not submit a bid on a contract with the City for the construction or repair of a public building or public work, may not submit bids on leases of real property to the City, may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with the City, and may not transact any business with the City in excess of the threshold amount provided in Section 287.017, Florida Statutes, for category two purchases for a period of 36 months from the date of being placed on the ITB 2018-232-ZD Waterproofing, Traffic Coating Services for Parking Garage Decks 17th Street Garage (Individual Projects) Page 5 convicted vendor list. Violation of this section by Contractor shall result in cancellation of the City purchase and may result in Contractor debarment. 6.4 Independent Contractor Contractor is an independent contractor under this Contract. Services provided by Contractor pursuant to this Contract shall be subject to the supervision of Contractor. In providing such services, neither Contractor nor its agents shall act as officers, employees, or agents of the City. This Contract shall not constitute or make the parties a partnership or joint venture. 6.5 Third Party Beneficiaries Neither Contractor nor City intends to directly or substantially benefit a third party by this Contract. Therefore, the parties agree that there are no third party beneficiaries to this Contract and that no third party shall be entitled to assert a claim against either of them based upon this Contract. The parties expressly acknowledge that it is not their intent to create any rights or obligations in any third person or entity under this Contract. 6.6 Notices Whenever either party desires to give notice to the other, such notice must be in writing, sent by certified United States Mail, postage prepaid, return receipt requested, or by hand-delivery with a request for a written receipt of acknowledgment of delivery, addressed to the party for whom it is intended at the place last specified. The place for giving notice shall remain the same as set forth herein until changed in writing in the manner provided in this section. For the present, the parties designate the following: For City: Property Management Department 1833 Bay Road Miami Beach, FL. 33139 Attn: Adrian Morales - Director Phone: 305-673-700 Ext. 2932 Email: adrianmoralesmiamibeachfl.gov With copies to: City Attorney City of Miami Beach 1700 Convention Center Drive Miami Beach, Florida 33139 ITB 2018-232-ZD Waterproofing, Traffic Coating Services for Parking Garage Decks 17th Street Garage (Individual Projects) Page 6 For Contractor: Florida Construction & Engineering Inc. 155 Bentley Drive Miami Springs, FL. 33166 Attn: Hamid R. Djahanshahi/President Phone: 305-883-7601 Email: fce52( yahoo.com 6.7 Assignment and Performance Neither this Contract nor any interest herein shall be assigned, transferred, or encumbered by either party. In addition, Contractor shall not subcontract any portion of the work required by this Contract except as authorized by Section 28 of the General Conditions. Contractor represents that all persons delivering the services required by this Contract have the knowledge and skills, either by training, experience, education, or a combination thereof, to adequately and competently perform the duties, obligations, and services set forth in the Scope of Work and to provide and perform such services to City's satisfaction for the agreed compensation. Contractor shall perform its duties, obligations, and services under this Contract in a skillful and respectable manner. The quality of Contractor's performance and all interim and final product(s) provided to or on behalf of City shall be comparable to the best local and national standards. 6.8 Materiality and Waiver of Breach City and Contractor agree that each requirement, duty, and obligation set forth in these Contract Documents is substantial and important to the formation of this Contract and, therefore, is a material term hereof. City's failure to enforce any provision of this Contract shall not be deemed a waiver of such provision or modification of this Contract. A waiver of any breach of a provision of this Contract shall not be deemed a waiver of any subsequent breach and shall not be construed to be a modification of the terms of this Contract. 6.9 Severance In the event a portion of this Contract is found by a court of competent jurisdiction to be invalid, the remaining provisions shall continue to be effective unless City or Contractor elects to terminate this Contract. An election to terminate this Contract based upon this provision shall be made within seven (7) days after the finding by the court becomes final. 6.10 Applicable Law and Venue ITB 2018-232-ZD Waterproofing, Traffic Coating Services for Parking Garage Decks 17th Street Garage (Individual Projects) Page 7 This Contract shall be enforceable in Miami-Dade County, Florida, and if legal action is necessary by either party with respect to the enforcement of any or all of the terms or conditions herein exclusive venue for the enforcement of same shall lie in Miami-Dade County, Florida. BY ENTERING INTO THIS CONTRACT, CONTRACTOR AND CITY HEREBY EXPRESSLY WAIVE ANY RIGHTS EITHER PARTY MAY HAVE TO A TRIAL BY JURY OF ANY CIVIL LITIGATION RELATED TO, OR ARISING OUT OF THE PROJECT. CONTRACTOR SHALL SPECIFICALLY BIND ALL SUBCONTRACTORS TO THE PROVISIONS OF THIS CONTRACT. 6.11 Amendments No modification, amendment, or alteration in the terms or conditions contained herein shall be effective unless contained in a written document prepared with the same or similar formality as this Contract and executed by the City and Contractor. 6.12 Prior Agreements This document incorporates and includes all prior negotiations, correspondence, conversations, agreements, and understandings applicable to the matters contained herein and the parties agree that there are no commitments, agreements or understandings concerning the subject matter of this Contract that are not contained in this document. Accordingly, the parties agree that no deviation from the terms hereof shall be predicated upon any prior representations or agreements, whether oral or written. It is further agreed that no modification, amendment or alteration in the terms or conditions contained herein shall be effective unless set forth in writing in accordance with Section 6.11 above. 6.13 Public Records City of Miami Beach is a public agency subject to Chapter 119, Florida Statutes. As required by Chapter 119, Florida Statues, the Contractor and all sub-contractors for services shall comply with Florida's Public Records Law. Specifically, the contractor and sub-contractors shall: 6.13.1 Keep and maintain public records that ordinarily and necessarily would be required by the City in order to perform the service; 6.13.2 Provide the public with access to such public records on the same terms and conditions that the City would provide the records and at a cost that does not exceed that provided in Chapter 119, Fla. Stat., or as otherwise provided by law; 6.13.3 Ensure that public records that are exempt or that are confidential and exempt from public record requirements are not disclosed except as authorized by law; and 6.13.4 Meet all requirements for retaining public records and transfer to the City, at no cost, all public records in possession of the contractor upon termination of the contract and destroy any duplicate public records that are exempt or confidential and exempt. ITB 2018-232-ZD Waterproofing, Traffic Coating Services for Parking Garage Decks 17th Street Garage (Individual Projects) Page 8 6.13.5 The failure of Contractor to comply with the provisions set forth in this Article shall constitute a Default and Breach of this Contract and the county shall enforce the Default in accordance with the provisions set forth in the General Terms and Conditions, Article 16. THE REMAINDER OF THIS PAGE IS LEFT BLANK ITB 2018-232-ZD Waterproofing, Traffic Coating Services for Parking Garage Decks 17th Street Garage (Individual Projects) Page 9 IN WITNESS WHEREOF, the parties have set their hands and seals the day and year first above written. ATTEST: THE CITY OF MIAMI BEACH, FLORIDA 23I kIN Rafael Granado, City Cr Jimmyorales, CityManagerercRt"lk, q.4B 94 ATTEST: c\P'• '• C� i,,LORI DA CONSTUCTION & � � •': + GINEERING INC. * :INCORPORATED: Signature/Secretary 0, ., . /, \mss ignature/President h Print Name 41"11 ;"`"% Print Name 01 /Ili -o19 Date ATTACHMENTS ATTACHMENT A - Resolution, Commission Item Summary, and Commission Memorandum ATTACHMENT B - Invitation to Bid ("ITB") ATTACHMENT C - Bidder's Response to the ITB ATTACHMENT D - Insurance APPENDIX D: Required Forms APPENDIX D-1: Form of Performance Bond APPENDIX D-2: Form of Payment Bond APPENDIX D-3: Certificate of Corporate Principal APPENDIX D-4: Performance and Payment Guaranty Form: Unconditional Letter of Credit APPENDIX D-5: Certificate of Substantial Completion APPENDIX D-6: Final Certificate of Payment APPROVED AS TO APPENDIX D-7: Form of Final Receipt FORM LANGUAGE &FOR EXECUTION r2"S�-C L- 3 ticN City Attorney Oats ITB 2018-232-ZD Waterproofing, Traffic Coating Services for Parking Garage Decks 17th Street Garage (Individual Projects) Page 10 ATTACHMENT A RESOLUTION COMMISSION ITEMS AND COMMISSION MEMORANDUM Agenda Item C)F MIAMI BEACH Date Procurement Department, 1755 Meridian Avenue, 3H Floor,Miami Beach, Fondai33139,www.miamibeachfl gov, 305-673-7490 COMMISSION MEMORANDUM TO: Mayor Dan Gelber and Members the City C mission FROM: Jimmy L. Morales, City Manager DATE: February 13, 2019 SUBJECT: REQUEST FOR APPROVA TO AWARD A CONTRACT PURSUANT TO INVITATION TO BID (ITB) 0. 2018-232-ZD FOR WATERPROOFING - TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH, 16TH, 17TH STREET, AND 1755 MERIDIAN AVENUE GARAGES (INDIVIDUAL PROJECTS). RECOMMENDATION The Administration recommends that the Mayor and City Commission of the City of Miami Beach, Florida approve the City Manager's recommendation pertaining to the bids received, pursuant to ITB No. 2018-232-ZD, for Waterproofing - Traffic Coating Services for Parking Garage Decks at the 12th, 16th, 17th Street, and 1755 Meridian Avenue Garages(Individual Projects). ANALYSIS The City currently owns and operates parking garages located on 17th, 12th, 16`h Street and at 1755 Meridian Avenue. The lanes and decks at these parking garage, especially the top floor, have develop cracks due to expansion and contraction,which with time get larger and allow water to penetrate the concrete and oxidize the rebars, This process can cause the concrete to explode over time. Continuous monitoring and maintenance to upkeep the parking garage is critical. As a result, the staff prepared plans and specifications to seek proposals from qualified firms to provide the waterproofing — traffic coating and concrete repairs necessary for these parking garages. ITB PROCESS ITB No. 2018-232-ZD,was issued on August 13,2018,with a bid opening date of November 9, 2018. Nine(9)addenda were issued.The Procurement Department issued bid notices to 127 companies utilizing www.publicpurchase.com website and 341 via email notification. Seventy-nine (79) prospective bidders accessed the advertised solicitation. The notices resulted in the receipt of eleven (11) responses from: Alpha Insulation & Water Proofing, Inc., Florida Lemark Corporation, Florida Construction& Engineering, Inc., EZ Caulking and Waterproofing, Inc., Tendon Systems LLC, Tecta America South Florida, Matcon Construction Services Inc., Contracting Specialists Incorporated, Cunano Builders, Corp., General Caulking & Coatings Co. Inc. and Restocon Corporation. The ITB stated that the lowest responsive, responsible bidder meeting all terms, conditions, and specifications of the ITB will be recommended for award. After conducting its due diligence, the Procurement and Property Management Departments verified the four bidders listed below as the lowest responsive, responsible bidder who met the minimum requirements of licensure and bid bond and submittal requirements, which included proof that the bidder is a certified applicator of the proposed manufacturer and that the bidder will comply with local workforce requirements (as applicable). Below is the list of lowest responsive, responsible bidders per Bid Location (see Attachment A for Bid Tabulation): 101 Commission Memorandum ITB 2018-232-ZD WATERPROOFING-TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH, 16TH, 17TH STREET,AND 1755 MERIDIAN AVENUE GARAGES(INDIVIDUAL PROJECTS) Page 12 • Bid Location 1 — 17" Street: Florida Construction & Engineering, Inc. • Bid Location 2 — 12rh Street: Tecta America South Florida. • Bid Location 3 — 16th Street: Tendon Systems LLC. • Bid Location 4 - 1755 Meridian Avenue: EZ Caulking & Waterproofing, Inc. Below is a brief summary of the lowest responsive, responsible bidders as provided in their responses: Florida Construction & Engineering, Inc. According to the information provided by Florida Construction&Engineering, Inc., the bidder has been registered to do business in Florida for 20 years and licensed by the State of Florida as a general contractor for over 30 years. The bidder has also worked on similar projects in scope for the Merrick Piace Garage and the Museum Garage in the City of Coral Gables. The bidder has also provided in its bid that the expansion joints used for this project will contain 15% recycle material. Tecta America South Florida Tecta America South Florida stated in its bid that they have been licensed by the State of Florida as a roofing contractor for 18 years while also registered to do business in the State of Florida for over 20 years. The bidder was hired as a subcontractor for the Miami Beach Convention Center renovation project by Clark Construction to perform waterproofing and traffic coating services. The bidder has also worked on other project similar in scope for the Brickell City Centre and Coco Walk as a subcontractor for Juneau Construction. Tendon Systems LLC According to the information provided by Tendon Systems LLC, the bidder is a Georgia corporation that has been registered to do business in the State of Florida since 2005 and currently licensed by the State of Florida as a general contractor. The bidder has performed concrete repairs and traffic deck coating for parking garages at the One Coca-Cola Plaza and John Marshall Law School in Atlanta, Georgia. The bidder will also attempt to hire at least ten (10) local workers to complete the project. EZ Caulking & Waterproofing Inc. EZ Caulking & Waterproofing Inc. stated in its bid that they have been registered to do business in Florida for 10 years and licensed by the State of Florida as a general contractor for the same period. The bidder has also performed concrete restoration and traffic deck coating for the Northport parking garage in Fort Lauderdale, the Miami Dade College Interamerican campus and Baptist Hospital Parking Garage 3 located in the Miami Dade subcommunity of Kendall. Although the bidder is headquartered in Pompano Beach, EZ Caulking will use already hired employees from Miami Dade County. CONCLUSION After considering the bids received and the evaluation of staff, pursuant to Invitation to Bid (ITB)No. 2018-232-ZD, for waterproofing—traffic coating services for parking garage decks at the 12th, 16th, 17th Street, and 1755 Meridian Avenue garages (individual Projects), I recommend that the Mayor and City Commission of the City of Miami Beach, Florida, approve the award of a contracts as follows: Florida Construction &Engineering, Inc.for Bid Location 1; Tecta America South Florida for Bid Location 2; Tendon Systems LLC for Bid Location 3; and EZ Caulking &Waterproofing Inc. for Bid Location 4; and further authorize the City Manager and City Clerk to execute a contract. 102 Commission Memorandum ITB 2018-232-ZD WATERPROOFING-TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH, 16TH, 17TH STREET,AND 1755 MERIDIAN AVENUE GARAGES(INDIVIDUAL PROJECTS) Page 13 KEY INTENDED OUTCOMES SUPPORTED Build and Maintain Priority Infrastructure with Full Accountability FINANCIAL INFORMATION Expenditures will ?e based on previously approved funding. 11 JLM / MT/AM/AD/KB/AG T:WGENDA12019102 February\Procurement\ITB 2018-232-ZD Waterproofing\ITB 2018-232-ZD Waterproofing 20190205.doc 103 ATTACHMENT A:BID TABULATION ITB 2018-232-ZD FOR WATERPROOFING—TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12T", 16T", 17T"STREET,AND 1755 MERIDIAN AVENUE GARAGES(INDIVIDUAL PROJECTS) Bid Location 2 Bid Location 3 Bid Location 4 Bidders 12th Street 16th Street 1755 Meridian Ave Cunano Builders Corp .,. $1,349,250.00 $784,860.00 $2,488,745.00 $2,408,190.00 Alpha Insulation and Waterproofing, Inc $1,167,490.00 N/BN/g _ 60 $1,725,000.00 Florida Lemark Corporation $841,711.09 - $589,676.51,7—. $2,297,183. - '$1,560,620.58 Restocon Corporation $772,407.00 $748,167.00 $1,896,021.00 $1,371,445.00 EZ Caulking& Waterproofing Inc. r. •- $70559.00 '. T"$466,94:00 � $1,649,808. 0-- —� ' �•,02 —8_------$1,023,872.003 ? ' ,.►Inc. $670,885.00 $1,901,690.00 $1,761,100.00 e •r. au ing& Coa int co., Inc. : _' 711;1 . MB _ / - $1,040,1000 Contracting Specialists Incorporated $1,667,585.00 $947,450.00 $2,582,230.00 $2,367,360.00 Tendon Systems LLC 1 $962,510—.07 - ._.'„__ • 3 :; $48 ,37"0.00 - -$1,632,976.002 $1,695,989.00 Tecta America South Florida $767,500.00 $425,000.00' $1,735,000.00 $1,542,000.00 Matcon Construction Services Inc. .,. 7$912,tS1;00' 7 , $464,641.00 >- `;; .i-$1,659,481.00 ,. $1,12.4,607.00 O 'Lowest Bidder for the Bid Location and recommended for award. 'Lowest Bidder for the Bid Location and recommended for award. Base price submitted by the bidder is$1,502,976,plus Permits Allowance of $90,000.00,plus owner's contingency of$40,000.00,for a total Lump Sum amount of$1,632,976.00. Therefore, local workforce and prevailing wage requirements apply. 'Lowest Bidder for the Bid Location and recommended for award. Base price submitted by the bidder is$888,772.00, plus Permits Allowance of $95,000.00,plus$40,000.00 for a total Lump Sum amount of$1,023,872.00. Therefore, local workforce and prevailing wage requirements do not apply. ATTACHMENT B SOLICITATION (ITB) AND ADDENDUMS MIAMI BEACH Procurement Department, 1755 Meridian Avenue, 3rd Floor, Miami Beach, Florida 33139, www.miamibeachfl.gov, 305-673-7490 ADDENDUM NO. 9 INVITATION TO BID NO. 2018-232-ZD WATERPROOFING—TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH, 16TH, 17TH STREET, AND 1755 MERIDIAN AVENUE GARAGES(INDIVIDUAL PROJECTS) November 2, 2018 This Addendum to the above-referenced ITB is issued in response to questions from prospective bidders, or other clarifications and revisions issued by the City. The ITB is amended in the following particulars only (deletions are shown by strikethrough and additions are underlined). ..4-_‘----- !--'Na further questions wilt be cQnsiadered.and no further extensions wn71 be made.--- -.- ------- -. I. MODIFICATION(S): 1) Product Substitution/Approved Equal The following products/manufacturers have been additionally approved providing that the bidder, with bid or within 2 days of request by the City, provide a written warranty from the manufacturer against defects of materials for a period of ten (10) years, beginning with date of substantial completion of the project. • Erie Metal Specialties, Inc. CST Traffic Grade Pre-Compressed Foam Seal II. RESPONSES TO QUESTIONS RECEIVED: Q1. How may I have access to the plans /drawings?Having reviewed Having reviewed Addendum No. 5 will garages 16th Street and 12th Street garages becoated with the N.O.A. Urethane system consisting of (74 dry mils) and not the epoxy with sand systems (123 dry mils) originally in the specifications. Please advise. Al. Yes, the 12th & 16th St Parking Garages must be coated with the 123 mils product. These garages are heavily traveled. Q2. Concerning the Question No. 31 of Addendum No.5, "Will the City Require N.O.A for Expansion Joints?"and Answer No. 31 Yes, the City will require a N.O.A. From our research we cannot find where permitting requires a N.O.A. for Expansion joints, nor were any of the expansion joint manufacturer products have been granted an N.O.A by Miami Dade County. As was done on the Traffic Coating systems, please provide the expansion joint manufacturers that have a N.O.A. approval. A2. The City will not require N.O.A. for expansion joints. Please disregard response A31 of Addendum No. 5. 1 ADDENDUM NO.9 INVITATION TO BID(ITB)NO.2018-232-ZD WATERPROOFING—TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH, 16TH,17TH STREET, AND 1755 MERIDIAN AVENUE GARAGES(INDIVIDUAL PROJECTS) Q3. There is currently a project on the street for the 17th street parking garage for all the structural repairs which require all of the concrete repairs for the top level. This would reduce the scope of this project. Please confirm if the concrete repairs are part of the scope for the 17th Street Parking Garage. Per the Crack Repairs Specification in Addendum No. 5 Exhibit C, shows a structural repair to cracks that would be under the New Traffic coating. Performing a structural crack repair per your Exhibit C can cause the concrete deck to crack 4 to 6 inches on either side of the structural crack repair. This would then deflect into the new traffic coating causing the coating to crack, this would not be a warranty item, repair cost would be the responsibility of the City. Normally performing a structural crack repair would have a Licensed Structural Engineer involved providing a signed and sealed detail due to the seriousness of a structural repair. In the industry it has been acceptable to route and seal cracks with an urethane sealant and then the application of primer and a 4 to 6 inch wide ban of base coat over the sealed crack (see detail attached)acceptable to the coating manufacturer who is providing the warranty. A3. The City's structural engineer has noted specifications on crack repairs in drawing provided within Addendum 5 Exhibit C. Contractors shall follow these specifications. Q4. Should we use the least expensive System as the Base Bid and provide you others as Alternates Systems? A4. Contractor may use alternate systems, provided that the manufacturer provide a 10 year material warranty to the City. Q5. Or should we keep Sika as the Base Bid product? A5. Refer to response A4 above. Q6. In the three new systems deemed as approved, the Epoxy coating option is not included, will Sika 720/22 Low Mod still be used or just the.Sika 720/745? • • A6. The 720/22 Low Mod and 720/745 Sika systems or approved equals are to be utilized on the 12th and 16th Street Parking Garages and 17th and 1755 Meridian Ave Parking Garages, respectively. In addition, all manufacturers must provide the City a 10 Year material warranty. Q7. In Addendum 5 specified the use of Emseal DSM as the chosen expansion joint for all parking garages, but existing systems are Emseal Thermaflex, and some are just backer rod and caulking. Should we provide pricing as if the intention is to install the DSM in all of them? Al. After further review, contractors need to use Emseal—Thermaflex expansion joints, on the 12th, 16th & 17th St Parking garages. On the center of the top deck of the 1755 parking garage, contractors need to replace the existing caulking like material, with one of equal quality. Q8. Also some of them have an aluminum cover, should this cover be included in all Expansion joints? A8. No need to include coves in 12th, 17th, 1755 Parking garages. Existing covers have to be removed and replaced on the 16th St Parking garage, after new expansion joints have been replaced. 2 ADDENDUM NO.9 INVITATION TO BID(ITB)NO.2018-232-ZD WATERPROOFING-TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH, 16TH, 17TH STREET, AND 1755 MERIDIAN AVENUE GARAGES(INDIVIDUAL PROJECTS) 09. I noticed that many of the Ramps to the Elevators, and the wash pours around them at PG 1755 Meridian are cracked and loose. They need to be demolished and rebuilt. Some of them have more than 4" thickness. Should we include this in the Bid? Is there going to be an Addendum about this item? A9. No need to demolish & rebuild the wash pours. These are not structural elements. Contractors only need to coat with the same waterproofing system to be applied at the parking decks. Any questions regarding this Addendum should be submitted in writing to the Procurement Management Department to the attention of the individual named below, with a copy to the City Clerk's Office at RafaelGranado(am iamibeachfl.gov Contact: Telephone: Email: Zuleika Davidson 305-673-7000 ext. 6943 I zuleikadavidson(a�miamibeachfl.cov Bidders are reminded to acknowledge receipt of this addendum as part of your ITB submission. Potential bidders that have elected not to submit a response to the ITB are requested to complete and return the "Notice to Prospective Bidders"questionnaire with the reason(s)for not submitting a proposal. Si --- I Al:x Denis Pr. u - ent Director 3 ADDENDUM NO.9 INVITATION TO BID(ITB)NO.2018-232-ZD WATERPROOFING-TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH, 16TH,17TH STREET, AND 1755 MERIDIAN AVENUE GARAGES(INDIVIDUAL PROJECTS) MIAMI BEACH Procurement Department, 1755 Meridian Avenue, 3rd Floor, Miami Beach, Florida 33139, ww4v.miamibeachfl.gov, 305-673-74910 ADDENDUM NO. 8 INVITATION TO BID NO. 2018-232-ZD WATERPROOFING—TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH, 16TH, 17TH STREET, AND 1755 MERIDIAN AVENUE GARAGES(INDIVIDUAL PROJECTS) October 30, 2018 This Addendum to the above-referenced ITB is issued in response to questions from prospective bidders, or other clarifications and revisions issued by the City. The ITB is amended in the following particulars only (deletions are shown by strikethrough and additions are underlined). I. IT2 DUE DATE AND TIME. The deadline for the receipt of bids is extended until 3:00 p.m., on Friday, November 9, 2018, at the following location: City of Miami Beach Procurement Department 1755 Meridian Avenue, 3rd Floor Miami Beach, Florida 33139 Late bids will not be accepted. Bidders are cautioned to plan sufficient time to allow for traffic or other delays for which the Bidder is solely responsible. Any questions regarding this Addendum should be submitted in writing to the Procurement Management Department to the attention of the individual named below, with a copy to the City Clerk's Office at RafaelGranado aC�miamibeachfi.cov Contact: Telephone: Email: Zuleika Davidson 305-673-7000 ext. 6943 zuleikadavidson(?miamibeachfl.gov Bidders are reminded to acknowledge receipt of this addendum as part of your ITB submission. Potential bidders that have elected not to submit a response to the ITB are requested to complete and return the 'Notice to ic pective Bidders'questionnaire with the reason(s)for not submitting a proposal. e ely, 02, ' (7.--), t�r'.D s ent Director 1 ADDENDUM NO.8 INVITATION TO BID(ITS)NO.2018-232-ZD WATERPROOFING-TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH, 16TH, 17TH STREET, AND 1755 MERIDIAN AVENUE GARAGES(INDIVIDUAL PROJECTS) MIAMIBEACH Procurement Department, 1755 Meridian Avenue, 3`d Floor, Miami Beach, Florida 33139, rww1v.miamibeachfl.gov, 305-673-7490 ADDENDUM NO. 7 INVITATION TO BID NO. 2018-232-ZD WATERPROOFING—TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH, 16TH, 17TH STREET, AND 1755 MERIDIAN AVENUE GARAGES(INDIVIDUAL PROJECTS) October 25, 2018 This Addendum to the above-referenced ITB is issued in response to questions from prospective bidders, or other clarifications and revisions issued by the City. The ITS is amended in the following particulars only(deletions are shown by strikethrough and additions are underlined). I. ITB DUE DATE AND TIME. The deadline for the receipt of bids is extended until 3:00 p.m.. on Friday. November 2. 2018, at the following location: City of Miami Beach Procurement Department 1755 Meridian Avenue, 3ro Floor Miami Beach, Florida 33139 Late bids will not be accepted. Bidders are cautioned to plan sufficient time to allow for traffic or other delays for which the Bidder is solely responsible. Any questions regarding this Addendum should be submitted in writing to the Procurement Management Department to the attention of the individual named below, with a copy to the City Clerk's Office at RafaelGranado( rT1iamibeachfl.gov Contact: Telephone: Email: '• . Zuleika Davidson 305-673-7000 ext. 6943 zuleikadavidson(a miamibeachfl.gov Bidders are reminded to acknowledge receipt of this addendum as part of your ITB submission. Potential bidders that have elected not to submit a response to the ITB are requested to complete and return the "Notice to Pro ective Bidders'questionnaire with the reason(s)for not submitting a proposal. in eAly, ex De]ent Director 1 ADDENDUM NO.7 INVITATION TO BID(ITB)NO.2018-232-ZD WATERPROOFING-TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH, 16TH, 17TH STREET, AND 1755 MERIDIAN AVENUE GARAGES(INDIVIDUAL PROJECTS) MIAMI BEACH Procurement Department, 1755 Meridian Avenue, 3rd Floor, Miami Beach, Florida 33139, www.miamibeachfl.gov, 305-673-7490 ADDENDUM NO. 6 INVITATION TO BID NO. 2018-232-ZD WATERPROOFING—TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH, 16TH, 17TH STREET, AND 1755 MERIDIAN AVENUE GARAGES (INDIVIDUAL PROJECTS) This Addendum to the above-referenced ITB is issued in response to questions from prospective bidders, or other clarifications and revisions issued by the City. The ITB is amended in the following particulars only (deletions are shown by strikethrough and additions are underlined). I. ITB DUE DATE AND TIME. The deadline for the receipt of bids is extended until 3:00 p.m., on Friday, October 26. 2018, at the following location: City of Miami Beach Procurement Department 1755 Meridian Avenue, 3'r° Floor Miami Beach, Florida 33139 Late bids will not be accepted. Bidders are cautioned to plan sufficient time to allow for traffic or other delays for which the Bidder is solely responsible. • Any questions regarding this Addendum should be submitted in writing to the Procurement Management Department to the attention of the individual named below, with a copy to the City Clerk's Office at RafaelGranado(c�miam ibeachfl.gov Contact: Telephone: Email: Zuleika Davidson 305-673-7000 ext. 6943 zuleikadavidsonmiamibeachfl.gov Bidders are reminded to acknowledge receipt of this addendum as part of your ITB submission. Potential bidders that ha elected not to submit a response to the ITB are requested to complete and return the 'Notice to Pros c : Bidders'questionnaire with the reason(s)for not submitting a proposal. Si cer l , 71D a"\-----/ gf--• Ale Deni Pr cure - Director 1 ADDENDUM NO.6 INVITATION TO BID(ITB)NO.2018-232-Z0 WATERPROOFING-TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH, 16TH, 17TH STREET, AND 1755 MERIDIAN AVENUE GARAGES(INDIVIDUAL PROJECTS) MIAMIBEACH Procurement Department, 1755 Meridian Avenue, 3rd Floor, Miami Beach, Florida 33139,www.miamibeachfl.gov, 305-673-7490 ADDENDUM NO. 5 INVITATION TO BID NO. 2018-232-ZD WATERPROOFING—TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH, 16TH, 17TH STREET,AND 1755 MERIDIAN AVENUE GARAGES (INDIVIDUAL PROJECTS) This Addendum to the above-referenced ITB is issued in response to questions from prospective bidders, or other clarifications and revisions issued by the City. The ITB is amended in the following particulars only (deletions are shown by strikethrough and additions are underlined). r..-77T.Norfurtfierwilt be aansiderettand no furtberexternsicns 1 be made:_- - I. ITB DUE DATE AND TIME. The deadline for the receipt of bids is extended until 3:00 p.m., on Friday, October 26, 2018, at the following location: City of Miami Beach Procurement Department 1755 Meridian Avenue, 3`i Floor Miami Beach, Florida 33139 i Late bids will not be accepted. Bidders are cautioned to plan sufficient time to allow for traffic or other delays for which the Bidder is solely responsible. II. DELETE Appendix E, ITB Price Form 1 through ITB Price Form 4, in its entirety, and REPLACE with the Revised ITB Price Forms, included herein as Exhibit A. Failure to subosdthe attached Revised ITB Price Forms(REVIS!OM 1)shalt render the proposal non- _ _.. . . - nssporrs armd said`ncn-responsive proposal shall not be Considered by the City._ -- = - Ill. ATTACHMENT(S): 1) Exhibit A-Revised ITB Price Form s 2) Exhibit B-Pre-Bid Meeting Sign-In Sheet 3) Exhibit C-Crack Repairs Specifications IV. MODIFICATION(S): 1) Product Substitution/Approved Equal ' The following products/manufacturers have been deemed as approved provide that the bidder,with bid or within 2 days of request by the City, provide a written warranty from the manufacturer against defects of materials for a period of ten(10)years, beginning with date of substantial completion of the project. • Tremco Vulkem 350NF/346/346 • BASF Products 2500 System • Lymtal International, Inc. Iso-Flex 780/750 Waterproofing System 1 ADDENDUM NO.5 INVITATION TO BID(ITB)NO.2018-232-ZD WATERPROOFING-TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH, 16TH, 17TH STREET, AND 1755 MERIDIAN AVENUE GARAGES(INDIVIDUAL PROJECTS) , 2) Section 0400. Bid Submittal Requirements and Format, Tab D. has been modified as follows: ... • Manufacturer Certification: Bidder shall be a certified applicator of the proposed manufacturer, if applicable. The City may require proof that the bidder is certified by the manufacturer as an applicator and that the bidder has been trained and approved in the handling, mixing, and application of the products to be used. If required, certification shall be provided within 2 business days of request by the City. V. RESPONSES TO QUESTIONS RECEIVED: Q1. How may I have access to the plans/drawings? Al. Please refer to Addendum No.1 published on www.publicpurchase.com. Q2. Our Surety company is looking for clarification on the Bid Bond requirement. Are we to submit a Bid Bond in the amount of 5% of the proposal for EACH garage individually or for the total amount for all four(4)garages combined? A2. A bid bond is required in the amount of 5% for each project Prospective Bidders submit a price for. Each project will be considered for award individually. Q3. There is currently a project on the street for the 17th street parking garage for alt the structural repairs which require all of the concrete repairs for the top level. This would reduce the scope of this project. Please confirm if the concrete repairs are part of the scope for the 17`" Street Parking Garage. A3. For the 17`x' Street Parking Garage, (under this ITB), only waterproofing of the top deck and the ramp leading to the top deck are part of the scope. Q4. What is the turnaround time for payment on approved work? A4. In accordance with Section 218.735, F.S. Q5. Is Douglas Wood Associates the Engineer that performed the design for all the below garage restoration programs that are going out to bid? A5. No. Q6. Per the ITB summary it stated to go to public website to download the drawings and specs. The only item posted is the spec/bid form.Will there be any repair documents being posted to look at? A6. All attachments pertaining to this project have been published through publicpurchase.com. Q7. Also, were these engineering services procured through an on-call contract or an independent solicitation? Al. Neither. Q8. is the pre-bid meeting mandatory? A8. No. 2 ADDENDUM NO.5 INVITATION TO BID(ITB)NO.2018-232-ZD WATERPROOFING-TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH, 16TH,17TH STREET, AND 1755 MERIDIAN AVENUE GARAGES(INDIVIDUAL PROJECTS) Q9. Please provide information about prevailing wage rate(s) applicable to these projects. A9. Prevailing wages are applicable to each individual parking garage whose construction costs exceeds $1,000,000.00. Q10. Please provide a Pre-Bid Conference Attendee List. A10. Please refer to Exhibit B of this addendum. Q 1 1. Is one bid bond referencing each project sufficient or should we submit four separate bid bonds? Al1. A separate bid bond is required for each parking garage a Contractor may be bidding on. For example, if bidding on all four(4) parking garages,four(4) bid bonds are required with the bid. Q12. Pease define working hours for each parking garage. Al2. 7:00 a.m. — 7:00 p.m.-Monday thru Sunday. Q13. How much of the deck are we allowed to close at one time for each garage? A13. Before partial closure of the parking garages can start; The ENTIRE top deck and exposed ramps leading up to it, except the 17th Street Parking Garage, needs to have concrete repairs and be waterproofed. 17th Street Parking Garage top deck will only need to be waterproofed in two phases, the West and East halves. Partial Closure of the lower decks will be done as follows: 12th Street Parking Garage Concrete Repairs: Shall be done on the North half of an entire floor, when finished continue with the waterproofing of the parking spaces ONLY (to be done in 2 weeks). Once the North half is completed, then continue with the South half. Once completed continue to work with the other floor. NOTE: Any exposed areas in second or third floors need to be waterproofed also. Contractor to include M.O.T. 16th Street Parking Garage Concrete Repair of the outer half of a parking deck and waterproofing of the parking spaces only shall be done within 2 weeks. Once completed, Contractor will do the inner half(2 weeks). Once completed continue with other floors. NOTE:. Contractor to include M.O.T. 1755 Meridian Ave . Parking Garage Concrete Repairs of the total area (described as follows) and the waterproofing of parking spaces within each area)shall be done in a 2 week period: EAST— 1/3 of 2Nu and 3rd floors, CENTER — 113 of 2ND and 3rd floors, EAST 1/3 of 4th, 5th and 6th floors, CENTER 1/3 of 4th, 5th and 6th floors, the EAST half of ramp on the 2N° and 3rd floors, the WEST half of ramp on the 2"d and 3rd floors, the EAST half of ramp on 4th, 5th and 6th floors, and the WEST half of ramp on 4th, 5th and 6th floors. NOTE: Contractor to include M.O.T. 17th Street Parking Garage ONLY the top deck waterproofing and ramp leading to top deck are being requested in this ITB. 3 ADDENDUM NO. 5 INVITATION TO BID(ITB)NO.2018-232-ZD WATERPROOFING-TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH, 16TH, 17TH STREET, AND 1755 MERIDIAN AVENUE GARAGES(INDIVIDUAL PROJECTS) 014. All four (4) garages have the same ITB 2018-232-ZD; are we obligated to bid all garages or just the one we're comfortable with? A14. Refer to response A2 above. Q15. Who will coordinate the closing of the garages? A15. The City's designated Project Manager. Q16. How does the City anticipate awarding this project? A16. Refer to Section 0200, Instructions to Bidders, Subsection 10. Method of Award of the ITB. Q17. Will the City provide the signs to block off all of the areas for each of the garages? . A17. No. The Contractor(s)are responsible for maintenance of traffic(MOT). Q18. Work for parking garages at 17th Street and 1755 Meridian Ave. cannot run simultaneously. Can work on the other two, 12th and 16th Street garages be at the same time? A18. To be determined after award. Q 19. If you have (4)awarded contractors, one for each garage, what would be the City's priority for each of the garages taken into consideration that work cannot be at the same time for 17th Street and 1755 Meridian Ave. garages. A19. The 1755 Meridian Ave. parking garage will be prioritized. Q20. On the concrete repairs the quantities need to be provided so that everyone bids the same, are items and quantities available or will they be provided? A20. There are no quantities available. Contractors need to visit all of the parking garages and estimate quantities. City will check each area before waterproofing is started, to make sure all cracks have been repaired as per specifications. Q21. Usually it is an industry standard to have linear or square foot area. Are there discoverables allotted for this project? A21. No, the City will not allow additional linear feet or square foot areas as discoverables. City will allow an owner's contingency line in the solicitation for unforeseen items. Contractor must notify and receive prior approval from the City before doing any repairs on unforeseen items. Refer to Exhibit A of this addendum for the revised ITB Price forms. Q22. Would you stagger the start dates for all (4) garages so that you don't lose parking on all at the same time? A22. Yes, the City's Project Manager will stagger the dates for all of the garages as it deems necessary. 4 ADDENDUM NO.5 INVITATION TO BID(ITB)NO.2018-232-ZD WATERPROOFING-TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH, 16TH,17TH STREET, AND 1755 MERIDIAN AVENUE GARAGES(INDIVIDUAL PROJECTS) Q23. Since you are asking for a 10 year labor and material warranty, can we get a written description from the product's manufacturer on the definition of material defect over the 10 year period? A23. No. It is the Contractors responsibility to obtain the 10 year labor and material warranty from the selected manufacturer that has approved and qualified said contractor to apply and warrant its product. Q24. During the Pre-Bid meeting, it was mentioned that all slabs are to receive vehicular traffic coating. Please confirm ground floor slabs on grade are not included. A24. Confirmed. Ground floor slabs are not included; no coating. Q25. Confused as to the scope of work for this project. Are we waterproofing all decks for all garages? A25. Yes, all decks excluding the ground floors. The exception is for the 17th Street Parking Garage which requires waterproofing on the ramp leading to the top deck and the top deck only. Q26. The project description mentions conducting repairs to the expansion joints. However, there are no specifications for expansion joints. Please confirm. A26. Contractor needs to use Sika or EMSEAL DSM System for Expansion Joints or approved equal. Contractor needs to supply the necessary materials for indents, also. Q27. Is the 10 year warranty required for the expansion joints as well? A27. No. Manufacturer of expansion joints and installation Contractor need to provide the City with a five(5)year warranty on materials and labor for expansion joints. Q28. What manufacturers can be used for the expansion joint repairs? A23. Sika or. EMseal - DSM Systems or approved equal. Refer to Section 0500, General Terms and Conditions, Subsection 59, "Or Equal" clause of the ITB for instructions on submitting requests for substitution. Q29. Do you have a standard warranty with language that you want signed or can we do the warranties ourselves with our own language? A29. Refer to response A23 above. Q30. Expansion joints will be hard to provide for a 10 year warranty. Please confirm. A30. Refer to response A27 above. Q31. Permits are necessary for the expansion joint repairs. The systems require Notice of Acceptance (NOA).Will the City require an NOA? A31. Yes, the City will require a N.O.A. Q32. An option may be to acquire a one-time NOA.Will the City pay for the one-time NOA? A32. No. 5 ADOENDUM NO.5 INVITATION TO BID(ITB)NO.2018-232-ZD WATERPROOFING-TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH, 16TH,17TH STREET, AND 1755 MERIDIAN AVENUE GARAGES(INDIVIDUAL PROJECTS) Q33. Is there a permit charge consideration? Will the bidder be expected to include permit fees in the lump sum? A33. The City will include in allowance amount as part of the ITB Price Form per garage. Refer to Exhibit A of this addendum. Q34. Are Contractors to provide the approved equal brands prior to the bid if they so wish to present one for approval and then everyone will know it has been approved or are we to submit it with the bid? A34. Contractors may submit requests for approved equal prior to the bid. If submitting with the bid, Contractors shall refer to Section 0500, General Terms and Conditions, Subsection 59, "Or Equal" clause of the ITB for instructions on submitting requests for substitution. Also, refer to Section IV, Modifications of this addendum for approved equals. Q35. Will you let all the bidders know if another product has been approved? A35. The products/manufacturers that have been identified thus far as equals have been listed in Section IV, Modifications of this addendum. Refer to Section 0500, General Terms and Conditions, Subsection 59, "Or Equal" clause of the ITB for instructions on submitting requests for substitution. Q36. It may be to the City's best interest to provide quantities so that all bidders provide a price for the same. A36. The City will not provide quantities. It is the Contractor's responsibility to visit all of the parking garages and estimate quantities. The City will inspect the concrete decks to assure all cracks are taken care of before starting the waterproofing. Refer to Exhibit A of this addendum for revised ITB Price forms. Q37. There is a lot of concern regarding the concrete repairs of this project as you can have a spall that turns into a massive structural issue and will not be an aesthetic repair which can completely change the entire scope of work. Has any consideration been taken towards any forms of forensic imaging, core samples, or any form of premeditated determination as to what could potentially be in the slabs, hollow slabs, and delamination. Would that be the City will be looking into? A37. No. If a normal repair uncovers a major problem, Contractor must stop and show the Project Manager for evaluation. Associated costs with approved repairs may be included as part of the contingencies allotted for each parking garage. Q38. These are multi-level structures. Careful consideration needs to be given on what may be underlying issues for these parking garages. Will there be other types of repairs than just crack repairs? A38. Yes, there are other concrete repairs to be done such as rebar exposure and broken slabs. When the Contractor finds partially exposed rebar, it needs to chip around the rebar, brush to remove rust, coat with cementitious corrosion inhibit primer (Almatec 110 Epocom or Approved Equal) and then fill hole with repair mortar (Sikatop 122 Plus or Approved Equal). 039. Will water and power be provided to the Contractors by the City? A39. Water will be provided by the City. However, electrical power will not be provided by the City; the Contractor must provide its own generator for power supply. • 6 ADDENDUM NO.5 INVITATION TO BID(ITB)NO.2016-232-ZD WATERPROOFING-TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH, 16TH, 17TH STREET, AND 1755 MERIDIAN AVENUE GARAGES(INDIVIDUAL PROJECTS) 040. Will parking be provided at no cost to the Contractors? If so, what are there a maximum number of allotted parking spaces for each garage for the Contractors? A40. Yes, a maximum of 10 parking spaces will be provided at parking garage work is being performed. Q41. How about storage area for the material for these garages? Will there be an area where we can store our materials? A41. Contractor shall provide its own storage container. The City will allow placement of the storage container outside of each parking garage. It must be removed from location once work of project has been completed by the Contractor. The City is not responsible for damages, losses or contents of the storage container. Q42. Will we also have access to the electrical room? A42. No access will be granted to any of the electrical rooms. Q43. Are there specifications available for the concrete repairs? A43. Yes, please refer to Exhibit C of this addendum. Q44. Will ready-mix be acceptable? A44. No. Q45. What are the minimum requirements for concrete repairs, past experience? A45. Refer to (page 14) Section 0300. Minimum Qualifications and Requirements of the ITB for minimum requirements. Q46. Is there a specific warranty schedule for the concrete repairs or is directly conducive to the waterproofing coatings and the expansion joints? A46. No, it is conducive to waterproofing. Q47. I noticed that 1 2th street garage had two separate garages within the same building. Neither one of them connected to each other and the entrance to the one of them was not 12th street. Are both of these garages considered one or is it in fact two separate ones? A47, The police garage is not under consideration; the buildings are separated. Q48. On the 17th Street Garage will waterproofing be applied only on the top floor? A48. Refer to response A25 above. Q49. On the 12th Street Garage will waterproofing be applied on all floors? A49. Yes, waterproofing will be applied on all floors, except ground floor. Q50. Are all the corridors that lead to elevators and stairs are also to be painted? A50. No. 7 ADDENDUM NO.5 INVITATION TO BID(ITB)NO.2018-232-ZD WATERPROOFING-TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH, 16TH, 17TH STREET, AND 1755 MERIDIAN AVENUE GARAGES(INDIVIDUAL PROJECTS) Q51. Can you please confirm that the contractor warranty on this is limited to one year and this 10 year warranty is a pass through from the manufacturer to the owner and not an obligation of the contractor/surety? A51. It will vary by manufacturer. Q52. Our bonding company has notified us that in order for them to issue the bid and performance and payment bonds in the amount of $5,008,900 (Total estimated amount of this bid), they require a funds control company to maintain an escrow account to control the finances. In that scenario, the funds control company will utilize the approved schedule of value and distribute the payments accordingly on every pay application. This scenario is in everyone's benefit as all subcontractors, suppliers and services will get paid promptly. In order for the above, would the City of Miami Beach approve either a joint payment agreement and issue joint checks or accept the contractor's request to assign its receivables to a second party (i.e. The Funds control party)? A52. Payment and Performance bonds will be required by garage awarded, not in total. The City will not approve joint payment agreements. Any questions regarding this Addendum should be submitted in writing to the Procurement Management Department to the attention of the individual named below, with a copy to the City Clerk's Office at RafaelGranado(a miamibeachfl.00v " Contact: Telephone: Email: Zuleika Davidson 305-673-7000 ext. 6943 zuleikadavidson(a.miamibeachfl.gov Bidders are reminded to acknowledge receipt of this addendum as part of your ITB submission. Potential bidders that have elected not to submit a response to the ITB are requested to complete and return the "Notice to Prospective Bidders°questionnaire with the reason(s)for not submitting a proposal. Sinew i Alexpenis Proc ement 0'.ector 8 ADDENDUM NO.5 INVITATION TO BID(ITB)NO.2018-232-ZD WATERPROOFING-TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH, 16TH,17TH STREET, AND 1755 MERIDIAN AVENUE GARAGES(INDIVIDUAL PROJECTS) Exhibit A- Revised ITB Price Form to _ 7 1 ,w 1 ' Price-Forms (REVISION 1) 5�; .i f 1 �.�• .4 Qonsive proposal shall not be cons erect by • 9 ADDENDUM NO.5 INVITATION TO BID(ITB)NO.2018-232-ZD WATERPROOFING-TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH, 18TH, 17TH STREET, AND 1755 MERIDIAN AVENUE GARAGES(INDIVIDUAL PROJECTS) Ir • - - • _City of N iami Beach -.. _— - - -_ !TB PRICE FORM-1(REVISION 1) .17t STREET PARKING GARAGE • Location:_640-17t Street,Miami Beach,FL 33139 The TOTAL BASE BID amount includes the all-inclusive total cost for the work specified in this bid,consisting of furnishing all materials,labor,equipment, shoring, supervision, mobilization,demobilization,overhead and profit,insurance,permits,and taxes to complete the work to the full intent as shown or indicated in the contract documents. Any or all alternates,if applicable,may be selected at the City's sole discretion and based on funding availability. BIDDER MUST SUBMIT THIS ITB PRICE FORM FULLY COMPLETED, INCLUDING SECTIONS 1 AND 2, AS PART OF THE BID RESPONSE. FAILURE TO DO SO SHALL DEEM THE BIDDER NONRESPONSIVE. In the event of arithmetical errors between the division totals and the total base bid,the Bidder agrees that the total base bid shall govern. In the event of a discrepancy between the numerical total base bid and the written total base bid,the written total base bid shall govern.In absence of totals submitted for any division cost,the City shall interoret as no bid for the division.which may disqualify bidder. Section 1—Bidders Price: PROJECT TITLE: ITB 2018-232-ZD: Waterproofing - Traffic Coating Services for Parking Garage Decks at the 12th, 16th, 17th Street, and 1755 Meridian Avenue Garages (Individual Projects) Waterproofing Parking Spaces Only $ Waterproofing Driving Lanes Only+ Maintenance of Traffic(M.O.T.) s Permits Allowance 40,000.00 Owner's Contingency 10,000.00 ..-!Lump Sum Grand Total(Total Base Sill) *PROJECT SHALL BE AWARDED TO THE LOWEST, RESPONSIVE, RESPONSIBLE BIDDER OFFERING THE LOWEST LUMP SUM GRAND TOTAL (TOTAL BASE BID) Section 2- Bidder's Affirmation: Company: Address Line 1: Address Line 2: Telephone: Email: Signature: Title/Printed Name: Date: FAILURE TO SUBMIT THIS FORM FULLY EXECUTED AND BID BOND (IF APPLICABLE) WITH BID SUBMITTAL SHALL RESULT IN BEING DEEMED NONRESPONSIVE. Note: Prevailing Wage Rates & Local Workforce Program Requirements are applicable for each parking garage whose estimated costs exceed $1,000,000.00. Refer to Section 0200 and Appendix D for additional information. 10 ADDENDUM NO.5 INVITATION TO BID(ITB)NO.2013-232-ZD WATERPROOFING—TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH, 16TH, 17TH STREET, AND 1755 MERIDIAN AVENUE GARAGES(INDIVIDUAL PROJECTS) A-I Mr- >- ..' tri§ . IIB PRfCE FO :•� '�! - .� • 4- _ i2' STREETP- -.. - r marts . _ _ _. L.ocaaor�512-leSt,--r=`.� - � �'•'. The TOTAL BASE BID amount includes the all-inclusive total cost for the work specified in this bid,consisting of furnishing all materials,labor,equipment, shoring, supervision, mobilization,demobilization,overhead and profit,insurance.permits,and taxes to complete the work to the full intent as shown or indicated in the contract documents. Any or all alternates,if applicable.may be selected at the City's sole discretion and based on funding availability. BIDDER MUST SUBMIT THIS ITB PRICE FORM FULLY COMPLETED, INCLUDING SECTIONS 1 AND 2, AS PART OF THE BID RESPONSE. FAILURE TO DO SO SHALL DEEM THE BIDDER NONRESPONSIVE. In the event of arithmetical errors between the division totals and the total base bid,the Bidder agrees that the total base bid shall govern. In the event of a discrepancy between the numerical total base bid and the written total base bid,the written total base bid shall govern.In absence of totals submitted for any division cost,the City shall interpret as no bid for the division,which may disqualify bidder. Section 1-Bidders Price: PROJECT TITLE: ITB 2018-232-ZD: Waterproofing — Traffic Coating Services for Parking Garage Decks at the 12th, 16th, 17th Street, and 1755 Meridian Avenue Garages (Individual Projects) Concrete Repairs $ Waterproofing Parking Spaces Only $ Waterproofing Driving Lanes+Maintenance of Traffic(M.O.T.) $ Permits Allowance $30,000.00 Owner's Contingency $20,000.00 'Lump Sum- 61randTeta.(Total Base Bus)- PROJECT SHALL BE AWARDED TO THE LOWEST, RESPONSIVE, RESPONSIBLE BIDDER OFFER! LOWEST LUMP SUM GRAND TOTAL (TOTAL BASE BID)" Section 2- Bidder's Affirmation: Company: Address Line 1: Address Line 2: Telephone: Email: Signature: Title/Printed Name: Date: FAILURE TO SUBLIIT THIS FORM FULLY EXECUTED AND BID BOND (IF APPLICABLE) WITH BID SUBMITTAL SHALL RESULT IN BEING DEEMED NONRESPONSIVE. Note: Prevailing Wage Rates & Local Workforce Program Requirements are applicable for each parking garage whose estimated costs exceed $1,000,000.00. Refer to Section 0200 and Appendix D for additional information. 11 ADDENDUM NO.5 INVITATION TO BID(ITB)NO.2018-232-ZD WATERPROOFING—TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH, 16TH, 17TH STREET, AND 1755 MERIDIAN AVENUE GARAGES(INDIVIDUAL PROJECTS) A-1 Gtty of Mttarns Beacie - "- ` .. -TiS PRICE FORdIE-3 r:,�,- {EtE1tIS1aN 1 .,...wr.ra- �- l STREET PARKING GARAGE � - • Location:10016thBeach,FL The TOTAL BASE BID amount includes the alt-inclusive total cost for the work specified in this bid,consisting of furnishing all materials,labor,equipment. shoring,supervision,mobilization,demobilization,overhead and profit,insurance,permit,and taxes to complete the work to the full intent as shown or indicated in the contract documents.Any or all alternates,if applicable,may be selected at the City's sole discretion and based on funding availability. BIDDER MUST SUBMIT THIS ITB PRICE FORM FULLY COMPLETED, INCLUDING SECTIONS 1 AND 2, AS PART OF THE BID RESPONSE. FAILURE TO DO SO SHALL DEEM THE BIDDER NONRESPONSIVE. In the event of arithmetical errors between the division totals and the total base bid,the Bidder agrees that the total base bid shall govern. In the event of a discrepancy between the numerical total base bid and the written total base bid,the written total base bid shall govern.In absence of totals submitted for any division cost,the City shall interpret as no bid for the division.which may disqualify bidder. Section 1 —Bidders Price: PROJECT TITLE: ITB 2018-232-ZD: Waterproofing — Traffic Coating Services for Parking Garage Decks at the 12th, 16th, 17th Street, and 1755 Meridian Avenue Garages (Individual Projects) Concrete Repairs $ Waterproofing Parking Spaces Only $ Waterproofing Driving Lanes+ Maintenance of Traffic (M.O.T.) $ Permits Allowance $90,000.00 Owner's Contingency $40,000.00 r - 'tip Sum G ragtdTobf(Fatal Base Bid) ... ..,a.-.-.. ...r .>-,._- r..- -.. . . PROJECT SHALL BE AWARDED TO THE LOWEST, RESPONSIVE, RESPONSIBLE BIDDER OFFERING THE LOWEST LUMP SUM GRAND TOTAL(TOTAL BASE BID) Section 2 - Bidder's Affirmation: Company: Address Line 1: Address Line 2: Telephone: • Email: Signature: Title/Printed Name: Date: FAILURE TO SUBMIT THIS FORM FULLY EXECUTED AND BID BOND (IF APPLICABLE)WITH BID SUBMITTAL SHALL RESULT IN BEING DEEMED NONRESPONSIVE. Note: Prevailing Wage Rates & Local Workforce Program Requirements are applicable for each parking garage whose estimated costs exceed $1,000,000.00. Refer to Section 0200 and Appendix D for additional information. 12 ADDENDUM NO.5 INVITATION TO BID(ITB)NO.2018-232-ZD WATERPROOFING-TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH, 16TH, 17TH STREET, AND 1755 MERIDIAN AVENUE GARAGES(INDIVIDUAL PROJECTS) r' .i,_t,� - .. .. - ay..f .0 _ •. gyp'<k '" r3ry xs '"'•3.acs'-anu` `E..anf Kr 4191 • .. ,;. s•%" — ,rtsg,..w a •..-:... T:':as�.Fer e<-.. _''� �:�. ��"3' - ►- ,' Y' -'" ITB PRICE FORM-4 (REVISIOl1E1 -- � • • 1755 MERIDIAN AVE.PARKING GARAGE !•- � .•f + ' Beach FL.33139 The TOTAL BASE 310 amount includes the all-inclusive total cost for the work specified in this Did,consisting of furnishing all materials,labor,equipment, shoring,supervision,mobilization,demobilization,overhead and profit,insurance,permits,and taxes to complete the work to the full intent as shown or indicated in the contract documents.Any or all alternates,if applicable,may be selected at the City's sole discretion and based on funding availability. BIDDER MUST SUBMIT THIS ITB PRICE FORM FULLY COMPLETED, INCLUDING SECTIONS 1 AND 2, AS PART OF THE BID RESPONSE. FAILURE TO DO SO SHALL DEEM THE BIDDER NONRESPONSIVE. In the event of arithmetical errors between the division totals and the total base bid,the Bidder agrees that the total base bid shall govern. In the event of a discrepancy between the numerical total base bid and the written total base bid,the written total base bid shall govern.In absence of totals submitted foe any division cost,the C:tv shall interpret as no bid for the division,which may disqualify bidder. Section 1 —Bidders Price: PROJECT TITLE: ITB 2018-232-ZD: Waterproofing — Traffic Coating Services for Parking Garage Decks at the 12th, 16th, 17th Street, and 1755 Meridian Avenue Garages (Individual Projects) Concrete Repairs $ Waterproofing Parking Spaces Only $ Waterproofing Driving Lanes+Maintenance of Traffic(M.O.T.) $ Permits Allowance $95,000.00 Owner's Contingency $40,000.00 - $ *ItumpSiimitearilIC cda1BaetBad] PROJECT SHALL BE AWARDED TO THE LOWEST, RESPONSIVE, RESPONSIBLE BIDDER OFFERING THE LOWEST LUMP SUM GRAND TOTAL(TOTAL BASE BID) Section 2- Bidder's Affirmation: Company: Address Line 1: Address Line 2: Telephone: Email: Signature: Title/Printed Name: Date: FAILURE TO SUBMIT THIS FORM FULLY EXECUTED AND BID BOND (IF APPLICABLE) WITH BID SUBMITTAL SHALL RESULT IN BEING DEEMED NONRESPONSIVE. Note: Prevailing Wage Rates & Local Workforce Program Requirements are applicable for each parking garage whose estimated costs exceed $1,000,000.00. Refer to Section 0200 and Appendix D for additional information. 13 ADDENDUM NO.5 INVITATION TO BID(ITB)NO.2018-232-ZD WATERPROOFING—TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH,16TH, 17TH STREET, AND 1755 MERIDIAN AVENUE GARAGES(INDIVIDUAL PROJECTS) Exhibit B- Pre-Bid Meeting Sign-in Sheet 14 ADDENDUM NO.5 INVITATION TO BID(TB)NO.2018-232-ZD WATERPROOFING-TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH, 16TH, 17TH STREET, AND 1755 MERIDIAN AVENUE GARAGES(INDIVIDUAL PROJECTS) .. . •AA I MA I BEACH CITY OF MIAMI BEACH PRE-BID MEETING t=1)4C:3 SIGN-IN SHEET r-n7Z10c KOZ DATE! AUGUST 23,2018 • r110-4 z X-n00 TITLE: INVITATION TO BID (ITB) 2018-232-ZD WATERPROOFING – TRAFFIC COATING SERVICES FOR PARKING cizco • . ci-c5v1 GARAGE DECKS AT THE 12TH, 16TH, 17TH STREET, AND 1755 MERIDIAN AVENUE GARAGES (INDIVIDUAL PROJECTS) z m z NAME C,CIMI,ANY NAML-, I)1 IONE NUMBFR LMA •D.nctitl c m 0 li'LLASE 11;IN I Ic) i I m 0•r„..., 1 1 ZULE I KA DAVIDSON CMB-ROCURENIENT 306-673-74U0 ZULEMDAY1121521114thiltiMIL/EMILLY. L 2_ _alet rii c 2)(1-110f, 0,4n4_11P.. ,.)) . _6171 IS )_ 8(025g- 3?/C. _rem 64,wehefiso . . . -5- 1 (n 0 hi —cn 0 142e010 latn 2.1__ SLIS .. .ti(21-k*1.11(...a i(;. terirm,f,,k qc V-74)-3431 4.r.!1.,ne..z eft,ty.50s.PI..0.s —5 ,„ 0 XI AU•e_ "re it ei:74-7 r...,,,r-v e..%) fi•$7.9..ib. mei -< .15m 4 Czterf 4.4.e_A.:?. Y..-..'2,4-C'-*S• 4?e,"-,6 i./.' o m c ca . p4, dijeukiLi_fitridliffeelLst:ett3 ' (114. 4227_:.P21.15:::._ 4.4L5atf.6_5,_P......fe_ztaitti.,,r44_—_ca"rt._ 6 Aff.tritbeL!(51LoplA eekR.A Co - loP ji h .S/n 2p Et cAnt - hl e cor2,1 -avi xi I 7 -6413A_11:DQuia.w.t•%..)19 1 140-153-12it(s .-Vviit liLyhtiiisi r,..... _ rn 7, 0 x 8192.AY_PISA/LA f 14/1_ ___... 1._LIek.is•_7 .0 B L ii.s. "4 w 1.4.1 414 TratASA tEgthaLprAl_____13 L 'Iiii 0 b '5 1 5.7.17_ _.._1*'it,Illfertret4 .7.7_FfgrA.ittiterpnalitly—_ 661 .-3..15._ /..tA44afrAkewilBrytb,74.0:1,j. 0,Ti._ 0 0 Wlientio_Natot_sa:FtraLbOatexpurif.11,, . Iitagt, yudieeisoellefeetvAteepwP," • c..... m x 4 ei.!_.6412715 __ fot-activf2PealteiPelskt#4 /M.nit- LIAO bO.C.Pg e_coM rde.-ctr:e cn --1 Cr 0(Kg_ainistirO*z- PIO Flutrrl R4'441>"8"r. 1SC-‘3416- 7D1 _1 .. . 1 , 401-, Ar\•,Atica___ .erny"_ 1144,0*.zer,.., :_noti.,_:74.-col iv ii ..,,__. ev‘.....c.,v ivy tii,,..0...",.",....s,„ - pf_f!P _fritro_t•-ser -la- 1 8.4 - 34-7-(1D 2- Riirie".._VVorere &IttlAvtil4ePso- fspe _ 16 2e-arkirtg/p03/H: 7- 7 C _ gni giii_. ,war.c;„, , eias at, r.D —--- Zeidi 5,(ri,y.roogni.ct..A.• --cr--- -------- -4 f•14- _17 iITO 2018-232-ZD Waterplooth 19-'Truffle Coaling SWAMI for Parking Garage Ili-KIK/kiwi Projects)IPRE,1311)MEE1INCi IPaga I 012 co --I m m 7i ... — - - - • • __. .._. •. 18_•_ v440. 22‘.4.42_77.___/‘—tr-e• _ . , _..--_ , pl-- ,3 _623 -4,6e • —2, , i . --). , • ,....,..„pi, 14_,,,ov, -,,,„___-,.(., u..,_(.186) ,,,_ z.,,,•• i_kic„...,„,.,, C.SID % Co•--1 > 2 > 20 1 Pivanc4s. o`PA.,\‘e) cPR__, -Ic. z>< 0 2 0—i—0 , Ar ossAgil —7-?...01;boti I.•A11:4-4.f.st4. G411.. _0 79)ff0---• ,g17 6 _rnfileml.e8Vfe.11)(0-1 e4e. eol.6k.,... __ _,Ignclo K 0 z 23 /2?)/1.7:9 O5740/ 'ce/ - 767-J-945_ Cl/Vitan 2 4 2 coQ,s7(4/424e._.Coes.,7 mo-iz 13-noo , Q 2 co• 24 25 ! ._:, _ft S ilzp,ft- _C-(21 232.---2_(3 c, ,..Lf.-glycie is@tre-mcp lic. c -v._ _ z-n z 2-.-6 hciC illitectgir b161004., Giatteinit4 303-.1esz•'ow ) _:-ece•oeioficcetkie 8 2 27 .t.,-.7.27.i.1,- - 8,.„- vh.- ..5-77,4,4172.,,kw.,:_,_ 9,,:± 90V-95-ir>" ,..r/3/-1/4./0,--(9_ ....5)9.-or)imew,t •er.,0 At __ 29 shii-id i _fAtiaiao 21airlAiv.i. Celt-4 Itati.Y4o.' C6'''.1 —--- 1 1v/ri1l_ / a j' o &i.d_641./rdhata..444v_ ___ _ -2-m 0 pz. 10 16 , 61ad _'_ _ _ _L =rk -31 clp t.aLrhicleoi kne-ces..ele+ _ 0 m c m il i oaztiac; b i VAiami 1/4 >, _922y • ,.. (0_rves4-9,,t cow tatir,_ I'x 33 r,-73i 0,te __ 0 N : •-• 0511111-akt 11J 4 14%±_j•Ct I\ ___ ,41 511'Om- Tim ME'_ei,16.1 6 Ne- /A,,ays0 i CO reAn 1 014 14'44, co 0 35 -CCP? AdVC PS*-1114Y QAiwii e1.1 td9414...214W64- P _ , 't ‘larevikitun 36 dp44,1-. e gt-7 ChtvetA rogrA Mac ifiet.411114i4C._3 5._it.-_ hq•-3243._ ___. Zetri ..2fieAtnaceltttia LIfft_t__afg,#-f __ m 37 o CIWtt_e.kaa_kNV.4.._fY.ArefrJ_____ 1 .2111.1_1‘ 72' Ottaritilad_CRAMOre All LtteM4V10:4'OP m N > --1 x 40 _I m isl -4 A a; -I l'i ITO 20113,2324D Walorproofing—Traffic Coaling Semmes for Forklift)ClioJto)(lottivicluol Proloclo)IPI1C-1310 MEE 1 ING Wasp 2 of 2 2 CD —I XI ffl Ill —I Exhibit C- Crack Repairs Specifications 17 ADDENDUM NO.5 INVITATION TO BID(ITB)NO.2018-232-ZD WATERPROOFING-TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH, 16TH,17TH STREET, AND 1755 MERIDIAN AVENUE GARAGES(INDIVIDUAL PROJECTS) CRACK REPAIRS SPECIFICATIONS: EXTENT OF WORK 1 CPAC;sS TQ 9i REP-AREC ARE fCAy_i N?NESE CRANING.;. 2.CO NOT REPAIR ANY CRAG(T}NT S,E32J THAN 3.336.'N0CAT.T3 MCE>PC+MT,U.ax 3TA?CARCE ,13TH C 1E142'STA:CAARO SPEC:iCA'CN RCP EPCCf.RESIN,LASZO 34G SYSTEMS FCR CL.'tK',RETE.' PROCEDURE 'MCROtJGH.Y CUAM ALL CAST,CAT..'AL..WEASE CHEMICALS.WATER AND OTHER CELS 3?tCL&to TEVA.1.liC4 AREA CF CR1Gx TO 3E REPA6EC. SCOPE FIIILLs-N6T44 OF CRACK SET APPMCP TATE 7LECTICN PCRTS SPACING CF PORTS SHALL SOL:AL T'.dCXN€.",3 CF uE34BEA 3ENG'N;ECTM OR AS DTHERYNSE RECUPED TO EWL'RE PROPER:R.ECTCN CF CRACK. u SEAL Pr-RT3).C ENTRE LENGTH CF CRACX 30TH SICES OF CRACK F CRACX€€,YETRAT_3 CCS. 7ELY TNRCUGM CONCEIVE IEM8IER3 EY ADPL YdIC MI Ci -3TRENG'il EPDXY R..CCMFORERNG TO APIA C 33i TYna'.I.I.V CR Y,PND'CPAC 3 3,13..E 3 uNDC. Y IE1P.f AND 3MDOTHL FOR CONCRETE hoNCM S'.'O 3E EXPOSED TO`.ELY. EXTRA CARE M.ST 3E TM'11 TO 4 ZP PASTE)N MACK C3ALY Ripa Y h1TM WPC.LTNL.TPPEEC.LNNL ALLY GROUTED D CALLAONO GL1a CR OTHER AFPRCPRIATE MG NIS TO las PAX'S ss OFF THE EXP+SEC SI.stFACESL ALLOW SEAL TO SCA R1!i AC.^,CRCAiCCE dT.M PRODUCT RECOKEE.WCAT CNA;LxSI:AL LY AT L3As'T 2i Ct P.3 i • I..ECT L:]Yf.4ICdt3SI'Y,,IGM.$T?ENCTN EPDXY.RE:N ADI.ESNE CCRF•CRMIHG TO A3713 C 43 TYPES L J,IV•CR Y.ANO GRACE 1 r1 A•13 3 MO C USING AUTCM.A&D IAL.ECTCN ECAJP,M`3 T Ned 3TEACY PRF1 -RLE FCR I.ERTC.V.AND!NCI..N CP.A.CX1.C.S.6IfihCE IbLECT,Cie AT THE LCN33T ENO CF CRACK ANO?ROCESD uP+upC CACI(MTh,ACHE3P+s IF FUSS*RCL PORT TO 3L:CLe3s 1 a7RTS CA?,OT BE ACMLYED, REPORT TO TIRE ENGINEER TEN WAVES AVER INTRA I4.£CT.04.,AS 3E3!CCMPL.ET AT THE KOPPER az T:ON 2OR`.REIM„EC.AT"NAT PORT Aril NO ACCO(TCIWL ACk€SA.E CAN 33 J1.ECTE FCR ALL TYPES•CP CRACKS(VERTICAL.*CLAMED A HCA32CNTALL REPEAT THE REI$JECTCN.ROCF.7:PE JMTL:AL.P RT3 RUUSE)UECTCN 44YE3/1E TEN E3MtTE3 AF'SR?REAMS 3..3CT,CIt PE w:LT-c3 N THE PORT ACCFPTYAO ACHENE. RE.SIL31E PASt-TICK?CATS INC?ATGl SLRFACE GRIND ANY MESS SEALANT.PASTE MOCK F.PDXY ACHE;CI'F SIGN THAT THE SURFACE LIME:MA.T RLY Ai:;AC3 AT 4441 ARGIMN'THE REPAJRED 34.43C S RLL:",N AMC 3RICOTN.W(T ,CGS:NG 3UPF,1^.E TE.XTLAE iN ARIAS'SFACN ARE EAPCSEC TO ACV. U CLEAN ANC REUOVF ALL SP!LLS.4147 LEAKS cc NJECT.CMALMES.1iE ANC STANS. `COTE LSE ALL?RCM-CTS IN STRICT ACC:RCAF,CE WIT',4.WtiGFACTURERS,'1fiCC RAENCAT'E?ILj *tECT:CN PCRIING DE':IC3 a 11CT? I. OXY 1i.ECTrA REN CK E:'YSGh6 PPOS E3 AS SCORE AMS MAL •LJ. ' - NECi33AR1 TO nacutu LOvG T`t F:RACK 'mac'3T.MING REPAIRS ARO REPtACE 'L C..NC.P£TE F IRIS ES T6 MATCH TECUA63.GCLCR ETC.. E85'.3011.0 iz3 CAP SEAL•TIECESSARY - RE:NFCRCEUENT F CRACK PENETRATES CCIYPLET=_"_Y TFP01CN CCMC.1/E]IBER1 TYPICAL REPAIR DETAIL FOR EPDXY INJECTION FOR HORIZONTAL AND VERTICAL CONCRETE CRACK • Additional Crack Specifications: A. If cracks are less than .005 inches at it's widest, NO repair is necessary. B. If a crack is larger than .005 inches and up to 1/16",then follow procedure attached. (labeled Typical Repair Detail for Epoxy Injection for Horizontal and Vertical Concrete Crack). C. If cracks exceed 1/16" then cracks need to be scored and apply Gravity Fed Resin. D. Previously Repaired Cracks: Contractor needs to remove old epoxy from cracks and fill with New Epoxy Resin. 13 ADDENDUM NO.5 INVITATION TO BID(ITB)NO.2018-232—ZD WATERPROOFING—TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH, 16TH,17TH STREET, AND 1755 MERIDIAN AVENUE GARAGES(INDIVIDUAL PROJECTS) MIAMI BEACH Procurement Department, 1755 Meridian Avenue, 34 Floor, Miami Beach, Florida 33139, vnw.miamibeachfl.gov, 305-673-7490 ADDENDUM NO. 4 INVITATION TO BID NO. 2018-232-ZD WATERPROOFING —TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH, 16TH, 17TH STREET, AND 1755 MERIDIAN AVENUE GARAGES(INDIVIDUAL PROJECTS) October 9, 2018 This Addendum to the above-referenced ITB is issued in response to questions from prospective bidders, or other clarifications and revisions issued by the City. The !TB is amended in the following particulars only (deletions are shown by strikethrough and additions are underlined). I. ITB DUE DATE AND TIME. The deadline for the receipt of bids is extended until 3:00 p.m., on Friday, October 19, 2018, at the following location: City of Miami Beach , Procurement Department 1755 Meridian Avenue, 3rd Floor Miami Beach, Florida 33139 Late bids will not be accepted. Bidders are cautioned to plan sufficient time to allow for traffic or other delays for which the Bidder is solely responsible. Any questions regarding this Addendum should be submitted in writing to the Procurement Management Department to the attention of the individual named below, with a copy to the City Clerk's Office at RafaelGranado(a�miamibeachfl.gov Contact: Telephone: Email: Zuleika Davidson 305-673-7000 ext. 6943 zuleikadavidson(a miamibeachfi.dov Bidders are reminded to acknowledge receipt of this addendum as part of your ITB submission. Potential bidders that have elected not to submit a response to the ITB are requested to complete and return the "Notice to Prospective Bidders" questionnaire with the reason(s)for not submitting a proposal. 7S' ely, lex i 6 Proqur ment Director 1 ADDENDUM NO.4 INVITATION TO BID((TB)NO.2018-232-ZD WATERPROOFING-TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH, 16TH, 17TH STREET, AND 1755 MERIDIAN AVENUE GARAGES(INDIVIDUAL PROJECTS) MIAMI BEACH Procurement Department, 1755 Meridian Avenue, 3'" Floor, Miami Beach, Florida 33139, wve,v.miamibeachfl.gov, 305-673-7490 ADDENDUM NO. 3 INVITATION TO BID NO. 2018-232-ZD WATERPROOFING —TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH, 16TH, 17TH STREET, AND 1755 MERIDIAN AVENUE GARAGES(INDIVIDUAL PROJECTS) September 19, 2018 This Addendum to the above-referenced ITB is issued in response to questions from prospective bidders, or other clarifications and revisions issued by the City. The ITB is amended in the following particulars only(deletions are shown by strikethrough and additions are underlined). I. ITB DUE DATE AND T1ME. The deadline for the receipt of bids is extended until 3:00 p.m., on Friday. October 12. 2018, at the following location: City of Miami Beach Procurement Department 1755 Meridian Avenue, 3rd Floor Miami Beach, Florida 33139 Late bids will not be accepted. Bidders are cautioned to plan sufficient time to allow for traffic or other delays for which the Bidder is solely responsible. Any questions regarding this Addendum should be submitted in writing to the Procurement Management Department to the attention of the individual named below, with a copy to the City Clerk's Office at RafaelGranado(c�miamibeachfl.gov Contact: Telephone: Email: Zuleika Davidson 305-673-7000 ext. 6943 zuleikadavidson(c(7miamibeachfl.gov Bidders are reminded to acknowledge receipt of this addendum as part of your ITB submission. Potential bidders that have elected not to submit a response to the ITB are requested to complete and 741 t e "Notice to Prospective Bidders"questionnaire with the reason(s)for not submitting a proposal. '-I , // c....___ _Th .4-1- ., 1/ ent Director 1 ADDENDUM NO.3 INVITATION TO BID(ITS)NO.2018-232-ZD WATERPROOFING—TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH, 16TH, 17TH STREET, AND 1755 MERIDIAN AVENUE GARAGES(INDIVIDUAL PROJECTS) MIAMI BEACH Procurement Department. 1755 Meridian Avenue, 3 Floor, Miami Beach, Florida 33139, www.miamibeachfl.gov, 305-673-7490 ADDENDUM NO. 2 INVITATION TO BID NO. 2018-232-ZD WATERPROOFING —TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH, 16TH, 17TH STREET, AND 1755 MERIDIAN AVENUE GARAGES (INDIVIDUAL PROJECTS) September 11,2018 This Addendum to the above-referenced. ITB is issued in response to questions from prospective bidders, or other clarifications and revisions issued by the City. The ITB is amended in the following particulars only (deletions are shown by strikethrough and additions are underlined). I. ITS DUE DATE AND TIME. The deadline for the receipt of bids is extended until 3:00 p.m., on Friday, September 21, 2018, at the following location: City of Miami Beach Procurement Department 1755 Meridian Avenue, 3rd Floor Miami Beach, Florida 33139 Late bids will not be accepted. Bidders are cautioned to plan sufficient time to allow for traffic or other delays for which the Bidder is solely responsible. Any questions regarding this Addendum should be submitted in writing to the Procurement Management Department to the attention of the individual named below, with a copy to the City Clerk's Office at RafaelGranado@miamibeachfl.gov Contact: Telephone: Email: Zuleika Davidson 305-673-7000 ext. 6943 zuleikadavidson(c�miamibeachfl.gov Bidders are reminded to acknowledge receipt of this addendum as part of your ITB submission. Potential bidders that have elected not to submit a response to the ITB are requested to complete and return the "Notice to Prospective Bidders" questionnaire with the reason(s)for not submitting a proposal. /4erely, ex ni� . Procurement Director 1 ADDENDUM NO.2 INVITATION TO BID(ITB)NO.2018-232-ZD WATERPROOFING—TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH, 16TH, 17TH STREET, AND 1755 MERIDIAN AVENUE GARAGES(INDIVIDUAL PROJECTS) • MIAMIBEACH Procurement Department, 1755 Meridian Avenue, 3r° Floor, Miami Beach, Florida 33139, www.miamibeachfl.gov, 305-673-7490 ADDENDUM NO. 1 INVITATION TO BID NO. 2018-232-ZD WATERPROOFING —TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH, 16TH, 17TH STREET, AND 1755 MERIDIAN AVENUE GARAGES (INDIVIDUAL PROJECTS) August 24, 2018 This Addendum to the above-referenced ITB is issued in response to questions from prospective bidders, or other clarifications and revisions issued by the City. The ITB is amended in the following particulars only (deletions are shown by strikethrough and additions are underlined). I. ATTACHMENT(S): • Exhibit G- Plans • Exhibit H-Wage Table(s) Any questions regarding this Addendum should be submitted in writing to the Procurement Management Department to the attention of the individual named below, with a copy to the City Clerk's Office at RafaelGranado(a miamibeachfl.00v Contact: Telephone: Email: Zuleika Davidson 305-673-7000 ext. 6943 zuleikadavidson(a miamibeachfl.gov Bidders mare reminded to acknowledge receipt of this addendum as part of your ITB submission. Potential bidders that have elected not to submit a response to the ITB are requested to complete and return the "Notice to Prospective Bidders" questionnaire with the reason(s)for not submitting a proposal. Sincerely, Alex Denis Procurement Director 1 ADDENDUM NO.1 INVITATION TO BID(ITB)NO.2018-232-ZD WATERPROOFING—TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH, 16TH, 17TH STREET, AND 1755 MERIDIAN AVENUE GARAGES(INDIVIDUAL PROJECTS) APPENDIX G Plans • ADDENDUM NO.1 INVITATION TO BID(ITB)NO.2018-232-ZD WATERPROOFING-TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH, 16TH, 17TH STREET, AND 1755 MERIDIAN AVENUE GARAGES(INDIVIDUAL PROJECTS) ---- — 4,art%1 ofFic..: c...0,7 *,•'• --ir *--- .a.--v...,-...'t _ -a;- --1,k_t_44.v- • -- 4 ' ..t;M---t--'ir-t•-,4.-_,- Z---'-- :,""-- ---- - z...04-, 'F---.k.g4 ---.-.,_ ''''TO".- A _-,17.,..e.-_:_.,- <-1.-31/. _ .- ...- ' .-7,, _ iff.E• f----. '' `-''; --.•,V-5P .. Ft 7 kr-I ez:..?_1:-.•_....i,-.,:-..--- .S. __-_- -. r2' -'--- ._-=1. _., _____„--.-,_ - _,- ----„,- .,.......„,_, , __.. ,.,,.. ..__,. r_-------.----------,_..,-----,_:--------__,-..-1---. - - r_._--- _ ... z ...... „_. .._,- , ...... — -,-..- ---..,_—_-,.._, —....„..._--,,,,-0-:_---_.---,7,--__ •,,„ --_,._--___--f_.,--_,-. ......f !..- --. ,.... ...‘ .., „ __:_______....„___ ,......, _ =__.,..__t • ,, .... . , ..____-= __ - -..-_, __ ...., , ,._ I. --'3',:.-7 7100 ..•,..._ ... ... ....• ..s, ------= ---:4"7.<,-..--.<..._-• . 7., ..4.1, ..- -..-<7 •<' .0.11' : - • ISO , ,......... _0 Am - . -.....=', .. --s. 7,.':.---._:._----"'_- :- 7.,_:., .. : ..a..-< .."'... < ---..' ''. •••••••........_____._... .--...1- 7-.-1• < ,-- '_...""=-- '____... ........ _.% v.-- -...1.7.-1.. .1.: ..."--7------tra. ... ,-- '''- ..; .S1q7.•-...... .- -",--..... ------ .• Ar... .. ,.. . . ---ry-,"-.. ---_ -,----- .2---- Jo-._, - • •---------- ---__ , 1-. -- - 47"...."--" - t- 1._.--F4- ,#-,74-=fiN. --Z4i:.--E c-- - t_:------t 7=":---*=----- -..:---+f-=-- .-------=----- 1 - 77-------- ---,--.1-----,... -.- — . I-Z. ,_ - --'1',•,-.*--v----s--.. ---- ti tl--...-Tir-;v.: —-------------_---------= - - - - --' ------;-- s ... '-' I*I,I.-I 1 r_--/,,r/-'=4::-,_ --z-,:1, .,..r---,:if—.2=•-e ,..... -- f - - ---.....-.... .,t 1 a__ --,:.:i 1 .:,,,- , .....'.•.. • ..iiii").."-,011110g°- - i l'.: "-,..-• _1 Z, -- ph., ._ _-_ ---Zit:*- -•••4-. .t'17'1 : t..:C.-•` I -..,.. -----.."-e_4140....,_ •..:. ..-:"..---ii..i.,.:4,. ---:4.1..4*. ,1.1-'-:.-f' :1 771 1.4-1 '4.: .--; •',at'g-i 1:' - '4 - - s.:-:--• _ - ,„1.-- :7- - _- _ ...1.-- i si,....____ • ---A.--_. , • :IN"' -.,. . _.,....,. - •---"4"*".'"'"7.. -7> 6 -,-• --•••:- ..e.- --e----- . - - -4•191■-• -. , _ i 4-- ./ ,- -- ' •-• -- _ ------- -- ------- 7 C.,Of MIAMI 3EACH . CITY OF MIAMI BEACH - CAPITAL IMPROVEMENT PROGRAM c3:1 I WA.0...1 Cl.... ICOLMSSKL.EIVS „.,,--,--.. • 'MEV IN NM.be. Sml Multi-Purpose Municipal Parking Facility Lai II Ora 4 il.m.1 Mm.1.1 bloo dbe - BID PACKAGE 04-TENANT NLILD-COT , 1 •- ; CIF,.*MAGER - -Ammer I I _ _ _ 4,1623 •••••--- PERKINS' ...........,.... ra.11 alma• W I L L 1 -- URS ...amen. ...=r Sawa NA tram km.d.Mom.I Aim AS 14111.111.lirowie Ow IM. Wm II Sr MID MIIMI Oaml Amur I hum... SS 4.11.11. mom a.......mos w ma .........Ir.... mam 0 IN i 1,...:.3r.“a•L.. wilNIM /701 rem*so........,41 ......... me................ ......s...sdo. ... UM, SmsallIMES La'W. LISS MIL n...on ....•.......a L.4 1 111-11,11•0 r ii.ZL I MALL, I..MAK.. 7 SAWN. I AL.. .LUNA. •=la Me •AlLaa.01111 I,1116.111.•11 ................ • _ _ - _ KKK-"=t! --.7,--.--,--f--,,,--1--.-1, ♦MILL _---- - J v.cIna Ream lanadDil t......'" - -• -- 1.0...1 Beach - , 1 _ --= . ��- _ '=ice l = `— Min Mt I MOW _ _ - ID '7 a 4 • —..__R • INDEX DRAWINGS 1 ! G-001 Y I'illlrill ,iii 1 11t i1 i 1' Il p" r---101 `i: 11 1 , I W 1 0 1 « Ir II ©► ,ipII ll �1; i I1� I� I(;r ,,i, ,1 �� il ; ; 2, P 1 1 li �� il _ Alli n1 1I i l/.1i 111 11111,' i '. li i 1 I ,O 1I1 11►1 ! 1 1 1; ! I ft ' 1EA 1 lilt � 11 .bi i1 IhI III, ' 1 1 1 1IIt I ;11II 1PiIIi' it itIli gsI 1 II , : 1 I 1, 1 1 111 I I i' 1 0 1 1 I 1 144.4gi1 . iii 1 r I lI1iIji 1 1 .I i - is 1 ! ii jiiJ ;"1;1 III 1idt;; 1 1 ul IIt . i1 f 1i 0 I i !! g Ilio t/l 1 I ►,S{ 1j •i1II Ii'iiiIiii't'i ;I, e it!-<&I J1Id ! r pVi 11--1 v-- i! 'I ILi . :i: F Q 11 ' pp til n r II R NI 111 1r------ 11_ 01 I i nn p J t -- i k • ir g. - Iv, ! Fi, I I 1I 11 11 II 1 i 1 i l I 1 1 : i U h • i I b 1 1 I l 1 i 1 1 I 1 I i 1 1 h ii �E °. ESIaI [1I;j1:IIf NII CAN111a1 - 11111 ; IIII °I 1 1111111 1 1 I I 1 HI llll 111 H. ►e l ( ( ,1 A re 1 rthllturtgr �{Ihhlithjd�rtl A::N{II1111 11t�; 1 It!Iifl1111:!ii Aim 1 111 rib. i i ...,II1.I.w..ILM..r..•.tg.1171 -N.A..,re 14,1,0, .:••••11:1•4 graveled.N•w.Nn.JN 1 II I klp��1 e! II n1111111 1 PI 11 .,11t lr11 . (►11 rr I11I r AI IlilIl111II1111i1N I;9NIdl Lill eliiiiIIII11 di;I�tri 1111IIi tIl Ih11e11111 IIIdh11IiI1111►IaiHI I;e 1111 F 1 .I►.t.n.1n..../hiiN.N>t.h.11....111...M.h11., Piehil1h,tjNiltt i._i.I.M111..t.Nm. ._ - 1 1i I 1 11 l I '" 1 1 I A 11I I '1111 II IL 1111114 II 1 1�i I Ili MI b I 1 " 1 1 .. 1 ::.•►..Il .r. Ill i.1.I,IAtH t1,g twill i►IIillhltdlllla iuII IIA II Iih rhllh1.111I;1I11 .1..1II i I t 1 ...1.1%:.bM.4".1.0..M.m19,.Ail 1 t;...N...Nilmhh.nl•...Int.1......i ....1-.iN4hot i�ilfilll{i�.,ow imat itiffiI IIui1lIIiimliilI 1pludih!GI IIIipllithilIh,1iiilillUi "A 11; IIlq ..2.......-004,,,.!*•11.1•!•1!••h h11R-.,,..1111.111IIIIIli1,,.-w.1410•01 n......t n..t1...mht, „ �IRRIN1 _ ♦WILL NE<»._ .op' 1 C"9ArOhl -- —"--z St iC,G TYPE _ P_.1A13V, P=:,LIR E`:r= —Imo— ,..•...... _ _-- �_-u :1111 .. ._ 1.110. •-- I — S .''�.�.. .... _mss 11,11• — a� ,.:0 - r:.•w.....-1111.• _,�., - ..1I..I..�i..r- • -,_—: �, ,- - �'-.:,▪ .• `�APP'_CA?LE YANI:i'•' a. -1111.,1111 __ ....,.......... . __�.... a'^ r .1 11=2• .1.!-......1.",:f....OM..-0... 1 L- G. 1111 �� OCa vox I 2OC4 ^?C GENERAL NC-ES y— _ 111**4.. ••. ;dra Inas-.. F,IA — f45� ft �' ... . .. 04,41 1'•--.a 11..0..•.1•i�••_ I • ��.•.�• .= ^ • -i1I 1•10.101.10.11.14 , ;GA.xr..Pro, �--....-1111..•••.. ..�..-,.�.+. - 1$� r'-..'-'114--� • • I- ...... ,... I_ •--='sir,:” _. 1111.`�Il�]� � � -' i —I .f114 � BEIEI�I , -qE n�>�iA lNS A.i;lIAY]AND�W'IlChi YF=C GENERAL NCf_s r�If, =:::=7.....-14-1. ..•,.,......_..�. = ..w 7EiWFEA•v-S .� - I'-Y.o-' • ..?'.•3... ...�...SS 1 .owl.rso.•—a•— I v— —1111.-1111. ants au �▪ -s,w• w------ � -rte :! 2. OCC?A;4.Y CLA»iFlCA 1ON j i .▪—..�.. :._ —' 11:11 .... �._ Zof .ec 1 K,A i 17....a................. ............................... . •,. ,S.S. .• 1-�. # ...7%,....r.-.--, v �.. ...•...... ..1%...•T.:1.• -.1,71.,:.,-; r... _ ,: •„ ~": —. gr▪ a" ....! i .-4 CV AC EGRESS E I E c CE CUUON PA!- I LEA'. IC o. 5l IL31NG OCCUPANCY I R 3S k O IR U_v 2 TR.�vEL 21S i'a� . —_ _ "_ < j .� '- J....-••••1 .- dT 3-.' .7 -•:w,r:—! -•• 11,11, •I ,.r�.�.i }""0.' I Wet,•owl/4t A.' ..a.... .r I ••• -an., I �- .-no ... ING I. Ina w-• . . u i... - . .w - . I 1 ,• '• • N... 4a i Pout 1111 ... } r�� �I_ .v lM l _�.,,�{ ,�,,... , _ I w , t ., , 'ON 1 • ,. i 314 i.a.41Jya:M....'•.I.vlw.r v v v� war....�rr .' 00 ., - . , ' . i Stn 1.,Iny♦n NM MOP •...... al I I I ZONWG ANO 414•.00.5/514 A..—...• •.a� II WWI•.n•' � - ' 1 BUIUING COO( � >I4 tl.a.7 r..q...• , «•1 ,•, , .• • •1`••, n• •.•I• e••.I, ,IamIa. I - 1 - 1 I COMPLIANCE „,,k . e WEs .,3N-I I . . I E,ESS NCI& r_..: . . • i NMI . .n ANALYSIS 71.'•T2... --G yrs o... 11_11.. 1111,.. 1.e. 3:�a-1111 _ 3s's�., i t A010 I. GEMIRAL PROJECT/FORMATION ~`__ __. -. S CCOST)KJCT10N TYPE ' 12 PU.WI G WOMB/YTS r� r''''.- •.:="'...• -- - - R —. _ area eD 6.•••••••••— ••••40 _... _�� • TY� _,. 1 F1!PROTECTION —' i= __ _. Igor �` — _L. ._ _ Fle ON.f _ .rl'—.���• r. �MUNE MI 1 V= _ __- 2004 RBC GENERAL NOTES �_-- - -.. — I . -_ r ammemommamo a., --- - -- - _ — r- 1 � ,... • _� ..• .. a."1-:=2=..�?- _ i Aii • mmo —_—•, ,.,_. I - - -- '���®;ate' 7% _ ..-"&"" n • WWI = ----- - _ 11=111111111. IIMENIM.E.111I 1111r1 FFPC GRIMM NOTES_ ▪ ,•— — r ��1...•�a�.c� _ —_ .! PM WIT Mtlllr 1T 0R�.Mi PMRIr .—_ _ . --i.- •a.rn....r•.wa.i �•i..••r.. _ T ••a .•r iimi ,�y -w•.wrrr_ - -- — ® :a= 1 a OCCUPANCY CLASSIFICATION I d ILDNG OCCUPANCY LOAD !7. EGRESS REOL1ftE1rO1TS 2! TRAWL DISTANCE A COMMON PAIN A COM BD iiiriliNg M1,�;1.1 M »• • rw. ; •_ r -Is .- t a .n -.n - r. - • •^ ^ t� __ = �` �----- se i - M Man mo J eh t • .�. wren*•_ r � an _ • , I - • . •• _ aAOMC COOS _ . - - - - .. _ - _.-_. __ •. , - .. .. _ .. .• _ _ COMPWhCE j NOM NO 110111 : IRISANALYSIS }I I --- -- -▪- - - - ..-_-_gid - - - _ - --------- • - - _.__ , . PIRKINS +WILL .'- i ININIM.74.4.7.:Ar ...1,',• ..--. ,...... -"--"-- , ....... ' 0 -..,............ I.. .-17..17: i a , 4 .447=4.27..1ll i ..... ..WV` :.•Zi..a...' ..., " ' I•"'"'"- A alr ' 1 I A sa-.1...T.—— -1,.. ..,:-.0iii..F.z•:.-1,14.1,-: - .__..... . , .....--.-=. 3E612 --1P221LQ1.2. ''.17.11 ...,__= 1 IP 4-1 , - --t r i I .r - X11111 - 71iiii 6fi- 1"' - - PI illooNdlt. Iii Ti. . i ...-• • i e , ;: : , : _. — T II I .9iii TO - • -,. IIIIIP JL MI: I , •f( _ .,,,,,..;74. litlir : Or_ •- ! ,.. i•-= t !I ! ..-.. .,..... !ill I 7-:ti Ici7.1 i ' UFE SAFETY - _-. FIRST FI.00R %COMO FLOOR , 1. 1 , • 1 i. S. . s S•- .. .. ., s 9 9 0• 0 • 1 ' ,. • kW, I ----= - I 0 SECONO FLOOR UFE SAFETY PLAN/1" 0 FI.RST FLOOR UFE SAA 2FETY PLAN T ..i.1 ......... • . . . PERXIMS ._....v. !I I IM---- ..... ...••••••21:SW hlultl-Purpo•• ----...7: 16.11cipl — ...... Parting Foollty ..-......... ...........4.4.4 .....11L.am.-•-• 4 314.7 r.= efa 41&-•le 'D:::4"..., C99 al Miami%aft -,............ --=-... Aim-'Taft .......-7110 • ---. P.I 1 .. L 1 7'' 6‘)... j ".... ''. ; 1.1 - k.-61 . .-.....-..= . . •••N es am . ' • ...., • *I=.14. 1141:1,, I I i, 1 -.... .".. I r. . ' t ..1;;; , 4 . ' 1 .,_ i ii 1: . i. ill 1L EL,- i (I-* L, .._. --- .----1.1„. I • , -=-4' . 4 1 i $ il*".-/ LIFE WEN _ — MST FLOOR 1 I 1 1 SUMO FLOO 4 9 r * R I 9 9 IN •* * . 9 PUN * ... ®SECOND FLOOR LIFE SAFETY FUN q.) ®Fn. rkoor ure sosr.rr rum Cb A-012 .................. • . . _. . ......_.....: ... e ITTI1t . TTITTIT ., ,.......1 __llt+-1---_- I I ,1- '. 1 -_-7_4-1-.I--i-.1-1 - I . 1, ir---„__, • ..... ,t41 :........,__, cr.,.ilmuk 1 ii -- :: [ . - - riiiiiIPP I\ i_l'"'' - ,1 RIM i . '1.'"fl$1 ,••'IA--- 1 o -,, ..: .41"a..i•- , 6 4 ":11 ;111111 F l A ITTTTIT1111 i ,• T a ti ........,.......... - ---I—II ii.•--I____ ___1..1_I LA___ _.1_ __i_._ : 1 . „ I.' . -,---I 1 - " I. I InLial il 1 v .1 , k.,,,,,,., ..-x, jit• Milk -'1.: ,i' 9.,1 .4 a.'_a 1 0 ,I 1 1bi '6— ---- 1 II ----- i•rovicki•iiii-iiiii.,- 1--- r! :.( .. • sr!, -.-. ' J — —0 ', i''''--'• a ..._____J—L. __ , _____._..__.__ _ _ ...__. WI — ---, II • ; e 1 g.. 111'1 1,11 ' 11111 iii ,,t, _--15_ • )". 2gm p . et !! 0 $ • i i i ::. •: 1 l° .114 ,41 ill ,.1:1 Al VII : - n, L--------- tillitlitlitiltileto cit;'.-: ID ui .. Pe (`—3 .WILL _=r---r - - a.hkw Partin FacIty I..4 �S=iall I1,....=,.- ;;a _ cNy of , , ... a` . &each • i _. L - i i--F,•-w - ,-Not �" _._i; 1.01 . i i ['_ _ t ' ' mrd I II- • 1 r 1 r z -i. i .L_ _ .i 1 i.., _ :..._ . - -- ems, . — 1 .=– UFE SAFETY .. -'R _ - a. MIRO FLOOR M .ZE &FOURTH FLOOR PUN ' ®FOURTH FLOOR UFE SAFETY PUN CD n THIRD FLOOR UFE SAFETY PUN Wt A-013 • i P[RRIMf erns .R .x+r I ""."y ...W..21........ , [El. _,. r, , , . �• ' ii a. 7O'.— ' C r"RAF. ._:.._._ :moi:; :r.,,•.. ... _t,....,. ---la - -our_ =>v me ivy I I la/111 .tea r 4_ +B0 1MAur G1. ^ . - I oL�,. I I . is roe _ I i r I PERKINS +N1,1. Minced I! zd.3 3?—' —. I, 3L-1 " , z--i en , My of :i 2L":: I Yan1 Beach ---LFA 1 aaa.•., i IMO MB aawI 1 CEI - IL ht 'I ----h— I ! 1 t I ; = or '— • s. 1 UFE SAFETY FIFTH FLOOR PIAN (1 FIFTH FLOOR UFE SAFETY PUN Y Q _o v • • A-014 . . . . • pERKims I +ritt.t. 31 ..--,... . MIlitlikrpoe• iNammeal Priam Facity •...7.7::..= ri:11 ...11I Ctly of 4 • • • . . . 7 , • Mimi Se.H — - c.a.- • 4•••-""'---AA',-.I. !,. -...-....?,-. .-N-..'.ANSNL--, .- i A-- -N-m- --. --- .—- -- _ , __2 _7.....,,,,.... .._......,......_._... ,.. .. 7 =4. . --, '44 :..1-- ft'se•miii —7 • 1 -1'.._ !...7:_:._'''-Pg...........- .. 1/-""et,,,__:•=7:-_-..":.: _._. -.'7--3;i: ,.. .i....-...4. _..L.,-,,,,,,,,,.- ..:-.,,,m.u=-.--zisem _ • --i - •• .--:1 -. _,-- : - -. _—= tr__•---„..mume. .-2 : rr-,==. .t._,,4._as -•"-- -='-Vagi --- . _ i _ -loop a..1.1.f1•011,*••lo• .—. --- m4- .... ...: . . -,.1,zi.,: ....N,... _ • . - =_:...41........,-,_ —le'.••:. ..... _ ___ .., • id--0...... ...i.,......v - -' . El-''''-— .. '• -11•16•11101 - zi -7 - _ 04!•., - : •-- —- , i • ••••• 6 i • • • • i lb••• . • • 4 L . r i 1 1 1 ( \JAR SCHEMATIC PLAN - 7TH PARKING FLOOR ,-,FAR SCHEMATIC PLAN - SECOND FLOOR 1 -::'i -1--- 'ZS' ...• -.;.:11.7.::•=:-• • • • • I e . , . . , i • ; , . _ _ _ -/,' ..........—......... .- -...---, e..r,- -:- 7--•••• a _ . - - .1.-s ••=a raw. •— . 1....:. .49.77,4-.77.117_4EM,. '---. r-Op. "' .-w-...,....-14, -so .. ... am..asioas.w...•A tem . ..— . ....-.-..---.-0.7.- 7 f..211e...Vir-.71Ele..1 ..._. ''S . ........r.. • . . '47 1 ••••• - -.316,...p....; ;...._____.,... :...,.-1. :.a a_, ----ft.. -.......-AM4....'".. R•1••••••••••••••• I!....7 ....., ' 0.6 .... ..- _ •••-•.-•---• I i lit. •••••• -..-A-A,sa fr. ... ....... •NA __ :=GZ... . . a •• . AI_L..... .A.A.-.O.. :4-7 ._._ .s,,k- 1...q..1 . .."' 1. ,... 411.:....1. ...4....... . . • ..._ . . .......44.... -_0.-1'_ ... mw.1KA-1•KIR mm*--tpleir i . :..'7. ,.......,i Nom AN!!,vir, -; t 1::.:5---': ..17E-M-.-.-)..- 7--•-•,., --,, ...... ...,....... ........ • tar uw I••• •1• am, • • t i- - t.:-....,-.. ji,.-,,,•+I I I 1 0,T., !•=1 X--•N,— 7 - " "' ••••'.2,... ..1.-,. ,-:. ••••••.••••••••,7 ..... .. ..., ................, . ...... .— 34--- 13..4.. ..k. —.. '--- - .1 -.--. peg NMI....AO .,. .- --.....f.„ i ••••••s••'• • ••••• •i• • •• • • • • •••• •— . . _ .10r9r....b. •-OZ.__ .1•51B. .-.. ...i.- an lilaom. '..-MIAA -Ammillia-:." .,..IPINg.' g. --& - .••,,,..: i r, —groiATAR — , ..... } •••••••= ••••••••.... • • •1'I • . •. • • • .--- --. .s, ...- •-.. .1,ma .• no a ....• moo alp:.•,,,•••••- trYJ.If ----4_, J? -,7,a.1_,.- --•-•_.._•'..777-.r-.-='......- , 6,1- .>:-i':-.7 ki$t IV i. • ".'ma......a --- . . •-- r –— fr... . • •1•1. . • ... --71-7 - ' ..-- .., _I.,- ___i-- 1,1-1"4"." LI i .••.•••.....,..• . '•••,••••,•••!•••,ww••••••!..•• sm., -- -.. --.*=ikk.4'..fu*r. •b E.'. _ --,,diA..T.-±31.....AAAA.--..—....A. —___ CACULAtIONS I mom*mum..mm j mm.msmo maa!mmalmmal mma I mari...• man I I I 'a 1• • M • • • mam A-021 II .--.FAR SCHEMATIC PUN -TYP. PARKING FLOOR f 3RD-STH) (.7,,FAR SCHEMATIC PUN -FIRST FLOOR 3 s.-, -• - (SRO-Spl OFFICE) Qi 7-• —.-— . • PINIONS ♦YILl - T__j -2.-: 2 t • S��T1: 7,'..x,. i „?,;441111 '. �lax.. :-.33,41' } IZJED rl IMP i --- ----.- ..__ .a 1 '441. il' T "V47 }3f -- 'I� 7 � s'3' Z.3 .....,..:....r .......,...0,„___, .... — — a� ,0 4 ,, ....., yam_ � � r _ � ---� 1 . c IT 1 4 lia*:_,A.Vz-gr4Xii – """:71 • '�'. .3•,g,'t �xy � INTERIOR I� I tel- OFFICE PUN I '9" .,16.-4 41 _ "* '' -_ FIRST FLOOR 1 - - - �' i IFIRST FLOOR Pow ---� I`, V A-25C ..s >_ PERKINS .I +WILL g_. __ __-.-- —' �.'_'r:_ N/Yc KI PLAN LEGENDRAN NOTA - 4 .,,...,.,„__ __ __ __:4:__--,__Ai -___4-'' 13;11:: '-ir__*--.---' . 44 i ,moi—"L c7.... _ ---.— - tv _ it a >a ;��{ .1 ;...4.7.7%I.F.r4r:.7.:::.= W .....-n= • rar .sa L I I i - .e� 4 - ONO a. 0 TJ • I OCCUP• er f.LAMPICArraN iIIS ! * / OMR .ter F. ' _ :r. I 4 ; _ =- �A — . . _ —'11 ii 4 _ I 4- Vt.Ve.‘..C. ,- 'ir .� f I" 7 it •. OFFlOEIkiEQ10K FI,UI 1 I) ' &, , FKST ROOK poll-fL00R RAN.. _.,,, ii A-250 ,TTEWar..7' PRICIER 1 - 4----- , „ . -, -.1. *VILA. - --- --71-----=.I 111;1 = 1.1 I' •I 1,:I'I I ..;obi!!11 -. - ,.c.-!c:c• .----...!•,-: ',F.,/ -.._______ . - — i ,.,.-- en .7,-1..a.mrtm i if p i .•_ . 1-7-J-:,..,.,.-i-,r'i r".. 7 W,,=Z..:I t 7.. ' IN` ,•-., , - t.—r. _7 MT= __••,,-.-,',.....4.17:.- -- z-,z••• =Er--•------1 :, - ..4 ---1--7-r . ,. - . . i En:----•1 17= • . ..S.... !4 •••......,,, ...,-. • • •34 -7_1_.--`-'" ,c•-,,•__ -4:-. I.3. , ''' I •.....,,,,1 4 - i i '• =IA I'or'-'.."•"'stltr.-1-',..:..... - ', =- ._ --- 'L-..,z-.-:da.-.-.1-'12---- .* • I:.T.•=•.-z.---..r.---r.--••=.:: i.--k.._ • 1=-1:C.÷.7-Eri::::::it.:.-...:. ke4.1 • 1Ilif a ,,..._. .,..._,- -,r1-- ;ELL,-,..: ., ._ i_aulr------- Illip t'4' r — Mil'1,We. ................ ::: 4- ........- . i ,Il II i l ie. Slir. ' 1 I 1 I II ! - . ID, i= _*".“:I '• !1p 1 3 .,20.3eano.3.3• MR larxr.....: . =___ I.:&...TNT i •••... 1 .=.t•3.•. 1 I ........ '' ?•;31 i •. ,NtIP4444:: _... -..._ I,N!! •_, ! 1 _ - --- .-.... .„„ I •I Nii',;1 J * INTERIOR• 11111 10 II 1 ' OFFicE PLAN I lilt I_ 1 I 1 SECOND FLOOR I S ' ---• --,.. 1 .1 11 •i i 1 I A-2 5 ic SECONO FLOOR PURR 6-", —.-—.. SS1 !PLAN�11421111)11421111) null soTy� ss} �!i : +r a4e i. ♦MILL .. �' 1 JI. 1 ; —Plartid I=a I-fir-. , •.. �•CfFra Flail1 rt 1 �� �'. eti 1-=._ =},$. .: d C117 Of 3rsrse,.1 1 s -4 +� 1� +G38�1 I i I, S.,...---t===...=:,.= t .Sr-- 7_,. w.A1f GENERAL foes _ �- I• 11 a �iCi _, 'nre.:•-.4 4-..-I'....r.1.2....3 : •,II ffi..4 , - c, . OCa.A.urmwn.. IJ'�1 1 _, /'"'• J-'- -- a I __ I fs -- -- jI fi I ` ' iI • + I ---g' E OFT(PLAN i . aa - SEGO°FUAOR FiF - - A-231 +l' - - sECO*Ft00.e" (.i —.—_. rIIRrirs i� -i:s�7' n 7:"!".3I mo"` �•'_I -7."--.._ ,g .. ' "I L' x� i ti erl :WIZ?.... �r`,-��,. =.y b' - - ?.. 1 z. �, _z.nr= '�d .....1r- .r. ' --- � =u-- l te i , -�•. 1 — ; .-.... ' - - ' w Man r. M _ _ _M . . N i` -_7,-z_ war't r I ik-ri 4 w k :_-_-- _ INTERIOR OfF!CE PUN . - THIRD ROOK _JF+cNti�:. ----=1 a i - ..as: -- a-252 -4IRD r_OCR.-AM '1 r 4--- reRK1Ns L — —; ��`_ PUN 1.11000 .r m iS. ons i 1 ILi" � I '` AF'AIGON I n no i..[��'�2..t? I i. .. PeAYq F. ca _-s. 374.2:7 i I co or nr�.4JiT fi1___— — s 3 ----: (31— — — —i a�sasatrs _ PIAN GENERAL RIDES ;�I 'i_�3 _� I .. _i:2 ▪ w --- -1-`-- I — _ _ �t• a;a n _ = „2, .._—�S I ,t1 y�ea,,, ►I t ra "� 71 O.aAL AMA W AT10M - - - OONIINCY W...M.ATWN Mr.: 3s 41......1•••••1'1 — I i 44.1 1 � 13 1 1 ! ?3'z °'4-, INTERIOR !! I -j -t_.a• OFFICE PUN _ THIRD FLOOR iI 1 — .� aTHIRD FLOOR PU$ (: —.- + ►4.111.. .. __ I _ fi ''3�J -. i Ds_ _ -z_. ___ $ IWa_ n ; 1:= ::::i : 1 4 1197' 7 -:r. 777 ®.M 17-41:10V # ..... r. �; iINTStOR 1 ri FLOOR PUN FOURTH FLOOR �f A-2.3 �.' FOURTH FLOOR RAN .....�-7.-7LJ I —jr-- 1 PIR[lNS PUN Llfd01 PIAN NOT!! —- i '' { +-ILL . 6 3' Nei """. me –.S 3� • ?T /UM P.•t.q F.clty - ---w E_ 'yam - - T-I t } Magni awn Iryr--s.--- ®--- — * — _ I + F. —= i I i --- �PI.AN SAL NOTl9 +A 3 1 —— -ss ------ - a ----944 OlIAL AglA 1/Ow.ulb _ .: -- .=-.- "" moi r J aime I iA I I� 1 Il e� —= I , .0. wf 0 y -. l ®- ---r-- J i- ,e!, -,c I * '�` INTERIOR -- . A-233 FOURTH FLOOR PtM (1 •WILI. ea 731.7.:417:..... G w Vie: r -7g+i - � Il!"[ T �r_tr�aeas • i--1�L:«...a� lir' iI —_._.. ��-J �—_—_— _ r. Laid xe TA'r •I A .,a ' s.. •� t &--"-----►__— --• co_ `L-.SCJ r� .wr ..... .S-rx.Y ) ' I dal.L .= .i ----- - — — _i - .. • 1.c.-.....1 -« F — — — � j AL?f-_ r INTERt --z:.� pTFICE PUM � �.�, MK FLOOR 1i FIFTH FLOOR PUN /I\ fff --- ♦WILL RAN LIMO RAN Mvras .- MN ormer • �="' ,........• .r Nazrr I N filIM P.twe Aloft as r=te_ — — I- i a r - ..CO -4 tea-• Er,7rzv.*-I (�- - — t --- - - a.�R & 3?2 ,7r----.—a — — __ r. . /� _ PIAN GENERAL NOTES • I ? _ j + '11511 sw.ax-a-mar-.�. '3es= _.:=- j ' Sri ___ 0- — - 01_'• a__ viii � ; "':moi :'.3.--:-...7.7--c.",'-7.r...=.• _ I am.,,,N.mu IA'• • -•f _ a=AMP: =s �•- al. t r f V �}----^ .r. a -a--...n. 1 1 V 7 oea .■ar C- s • a �.. •••••• I o S- F OFFICE EPUR = Mil FLOOR A-254 3 mmt nAOF1 RAN Q .__ - — — — — — -- — _Nis;., =hv _2 ECJ Sr 5.7.-1E21....F. PRISONS Ss ' Asa-a- ..-...=� • r a- - Z - - - _ � Ca .mss - ---- I ` -- �,- ' - �; : . ! ---- - -- - I.-7.-:.1.7-1,-:. .kI - -- _,. • 'I `. _ - GENERAL RILL..ORK NOTES .. ..- — 1.�— -- il ' . ' - • r -- f si:s�-L�71SifIE iF.N `-3 _~ — �7— -- 7Q..«_ I aa� �l �. r - gamI ' ' PA;e0filir 1.' " ........-........- VL.:, ...._... - noir em I • _- _. iii7lJ•_ 4. ! =j : E4 '5 -_--_' == LT 7-=::::1.7i.3. R.3 I .=.741 = _�I it• - s R„ -_•- - - - 212.'.'"''''''''. s.... - a jg J b,�-- . _a - .- .. — = -17,211 i'M 1 $ 1 rr c 0.4elk: icr FINISH PUN KEY NOTES /_ __ E. =� • •• 0:4 li ice.—_--- I i � :2,, ; � G-._��_..._. r.. y II."'” w - I NASN?LW FINISH PIAN GENERAL NOTES - -- FIRST=EooR ,� FIRST FLOOR FINISH PLAN Ua' 250 .------: ;�,m -I- LIna- 1 I —.__ 7 POOH PILAII LBWS MEN SCHEDULE PERKINS 4 = -�y cars�sel MICall SIM +WILL I! P.....„,....:....1.1 1 f ««� �� t�I s a -yam' .-,- «...... $- a I is AL 11ILLWORK NOTES - .. .. =j'3j�� � s— — I I. ,:i':.a.1 - -- : ; : =-- '_ I« _ — si« s-- —-— -•- r` — — — 72'..."..."......"•.".."........." ._. j=aara_ l; I I I� 7- R - �.sT - --�7T�• t .�. --- Ii 1 JI ,� - .�....;-=-.7,:::::-'-i.__ __-_ •ice rz--_�7�, rs: I, /' i_ 3=' ;_- ------- ..'. — s-a:.a ilk, � � . - � '??Ra-..7.-..r........---z--,..4- -- .. « : sr_�•- _ Ti. 3 1 _ Rim I�.� ` I'9tl a ?�s.� _ 1 I. •zs_asa_ -- -_ •:,..•=z-••,=,_,, SS j ;, ,-, ‘�� I FPIL9F'I PLAN GENERAL NOTES .. .,t �« �iir __ ___ a-_ _ _ -�s_", ii ` .. .. -. y �� FINISH'LAN 1 p.� f.....I a:- ,, :i. FIRST FLOOR 1 , FIRST A_OCR:NISN PUN `� ���7=1- _� _ I •.. «i _ ;3..- A-260 1 1 -_.;_,..Pry ,...---..e,s, 'NC, '-1,. _E.= =A-2.-i ;::-.:_r_n PRRNINS Mom emir I -I LI ' Cra al : i "- i —_ . -- 1--lir ` ---- '•' GEVERmL MILLWORK NO TES • �l••-�-�• _ '71.11- if {s = __—____3__- --- -I- ---_..-.I _� {I III , y :$�_ �: _ - •- 3'x:=..a • VIII' : __ 3_I r� I FjEA T 1 .aaeN n ' I s.r I _. I am'rna'"n r ==ar r ;III III-.-_- ';, ._ i.l� ,-_.._.-.. - __ 'T—r II - 7'2----- _ . a. 127.23._. I EF:------M- , ��i_ 1_ i— eeR---�-i r - � J t ' _ ., FINISH PUN GENERAL NOTES 1-I - - - 1 +j S!_I _�- �x • �Ilr Ili 1 n-y 7�1 • INTERIOR • F I I I !Ilii I II II a _ �_ li• FINISH PUN I I{ II —� - I FINISH PUN GENERAL NOTES � ! • SECOND FLOOR I tIII` _ -- - __ —_, i i!{ !;l SECOND FLOOR FINISH PUN `� _,,,,_^�•,Jp -I- I i=s W { —r,........ -1 � I ,________.7 K�� ; IMO aeoM SCHEDULE'r_—.., PERKINS r. T�=� r earal=ICI r¢rwa Iawa ♦MILL' III I X - . _ • _�- — �. _ an:= �.r _ ^;; , -ms _,__ GEE of ' • —_ --- — .,/ tilt:7;z: ni -- sr:--- r.m 9..ch i _:' _}_ .. _ S'___ . 81i C 1...*:t GENE4R. wL.rcNK aor.� II -a.- //(�,. Is`_ __Ty'►' y i s� i If14-7—'-----Ti; 14 I ;I - '•TA_— sTL— — ' a -_ C. R,-s sza — • 3'�-..:.-_s- Isi =y lv1.' z r. i .s = r' i it-Ig s _s�. I =_= ,=---- _ T2Si- ` �' r y _s_.,- r -• Nom'— yi }_._ ,I , _ I-FINISH PLAN GENERAL NOTES I._ .�. _- ;!33TI.._ r i -+ --,' fizz.: INTERIOR i JI I�I a.--4' �. ~ r _.....�._ .rte-�'.� MESH 9..IN ' SECOND MOOR - C _ t , Y .•.-1.s... � A-261 SECOND FLOOR FINISH PUN I I 1 �, PRRRINf j - Lel--- i.:IC '_�i's4 Sr* +91_^010 ,7kS ♦r I L L — - i — , Y —T' r 1 1 i - 1 - -- I, 1. —I— , ' --1 15 4. •. _- 3 '--;-- -= Y-: i9 LSZ:.: iiiirqii t , - —._ -- ___ a.- -N r ` --- -— 0.YG xAL 4111M07. NOIC.i 1 ' .• •---' a; is •..= ,-"..._i z°>a�.a:.�ar_r.��.r ! _- —•r 4,••••1 ry 4 ------:-.'=...�. y...7 a.(- j i -937.4.0__ i • II 1 �'7i 3 ...--..,...,..=,,,„--,_:...„......: ! 1— x- i �.-..-4-- . _.I - - ! 14 r 4444- I_ I••• I�,�.-..-- II' }i -.1. '','.‘.''.'1 S-i--7"dSl-=:T`.. --• I +.1R•-•---f "__-...1:-7. - I- tom...-. MI :r- -im i.1 .,•:..R.-%-;74112-.1.---• I r.= ',s:-..-.-- - 1 -4444, 7 _ - - -s'''...'''''..4=7:417:-.... .....-.••••••,=: .-; • sr----._ � i • c -x,,,---^ a�? ,1.--''' $,_ — - L.I .=�_-� IPP I PIAN GENERAL NOTES .�••c--L^ y n- 1, i _� ."a �` - I_ ..1-- V1 • I 1 9 1 } } i IMTER1011 1 - FINISH PLAN GENERAL NOTES t I" -- - Its MAO D 8000011 ii 1 �i RO F_00R ARISH PUN - „Y :zr .�- 1-- =---, 1 .,y I .-V 11 - 1 s --. r ,�h . :.. K� +ASMI SELLS I I. 1.: R R I M f _ •_ • _'_ _.. _. .. - RIRS7l.r/i+7U'=7 f i1� I i'r==L RR"ieis ,T ' =.r -...""'"1.• .. '"'-=-I l)) �. — — I CI,at c — • .— R.. a � _r ..Y �.� —:saw= t —=te_ $ u"' _ I _ _ S .r I« I__ ta-_--I1 j I I 7.3 .Z.` -yam =............7................_____ a. mss..nu Pmt• IIIMIONIIII s '� as=ar_v- - . - '.x.31.1.. Mars ZM '&•- -_.- • r FlNISH PIAN GENERAL NOTES '^ ; 5.... =-- . I. ar-.�� . Ip_..-..............._. i,. rIEI1 ^�I "'!'- I-- f" I FLOOR a iI -1 69 NIROFI ISH PLAN 1 T _ +1 J- r _ I{ � ! _-_ G Illy 1plo =RJId r i A+as -PIIIIIINS +MI=I . � 9,m =r4 ' .i-_ =-x- _ ---:- -i : ---- _;1 "9' - GENERA,. *L'NCRN '401E3 � �-'�-'• r y-asp_____r-r- i �/Si - I 1-- Ki-l'-'7‘...-i. -__ r ` ^ s "'Ta I y. �^ _ __=-_--------- -_..i_ __ • , .•7:.:•.....:---.*::;•.--f...----—-•••••••• 1:jj_Or L: Ye'.....z.:„.1,............%=."-..,.1•:-.--;' ;__ ' 1 d---- .„.„..„..., .., .„.„:„.•,.....,.....,..,...._:,,-„,-., _......„.... .........___ .._ ___ , . _, _ .,-..,...___,=__._. ,• ,_ _ __ ._ ., .„....._.. • . . ;:...., ___,, :,.., .4, . _ ........f„:„......_,.,...........___. : . . „...7.„.„,,,........ ...........__ , , ..„,...... 4/ • .7,..ei_ . ...,:.-,,..,_..,.:.,.....:,_.... . , , . - .....„...„-.....___- ,..... ,... ,............... f: ._.% 4 s sra=err--•- 1. _ '=^ ,..-. , ,"� _. ^x Sys•- - • MF-;---s 3.•.. _..:.'"., FINISH PUN GENERAL NOTES .I- -j .: - I Y I —" KAI FINISH PLAN GENERAL NOTES .-- T' :'3'.3 i =OUIIiH�MAi li ? ycuRTN iLCOR FIN:SF PUN v _ -.- _......- i I'�- 17 I FLASH PIAN LEMMA) I FLASH SCHEMA P[N[I N S }. $•---' •- }y ,ys, 1......7r.-... ' �. --�I Ai:curvy.luN• Mill. t.Y6 ♦w 1 L- - '''.i''. ..i' 1. $-,t tit, = ? I :'a-,_. f'-'-.`7 = IllAtH vv«N _ -s=_ Oty of j _mak -_--4 ---- ` .. s -.--- . c- GENERAL uILLWOd<NOTES «�..- �_-_ ._,„.......▪ .= ✓'� t��: --14- a�4 ; • 4 z'S3'3ss�71=:=.ter_ - I 11 f r - yy '-' - ............................... - .- mini FR . ._ s.r ..-. AM MI wwt ,�R. a = ---- -- j,._ • I ' A s �;�.-> 3'3r,.....z--- .. ...... I=7::::::. 1 41 smear _---- - - - 'S:z.-- _ ,..,-_,-..,-..=,-.-_-,-._______ I - -- T_:�- _ =—_ ---- - _ r__— _ _ _ I.-.7.-�... $t PM19N PLN GENERAL NOTES •• y- - ;43dXis ""•• 5 f 1 0............••••••••••.-.... .�- ��.-, . .-.-,SL-- AM-1r' •� - +_ N-ERICR _..3FOORTN FLOOR I f -_ 1Y --'�ST_'i�1.1 I f /I1 FOUR'N F_OOR FINISH PUh .,•--- =+,�7- -_ . . . ' 1-- — . : 't . ...::•:: _E , •11111KINS '.r 4, ......„ 7 :, •- :.,.. , - •••••••.• • ,=.. .... ....:: .4 Irsar 021111. MILKS Oda ..,7...."1 -:--:: . , ,,,,......-.... I - X .......- ...........•••,.... .. .... ,...1..1.....7 It.,.X.... ' +VI 1 i.,l .,:ifre, •••••= —,..: - -- I1 '' . ' 1111 ---- -... ,..7.%;.-1,1-,.-. ._ --. . ........ . ....t- - , _,_.., , _ , .......,_.. ,7„:„.::,-,-, r_.,......-_ ,a--,,4 ',..•,-: i' ' ! .= ... ..... -.1-- ; .......vo. ... .-....... ,,,.. ., I --. .,,i... ..... 7.....,,..• -:,cr; .6, 1 '1 Lar....r1 , • A• -- - 1; - -- ,,1__ 1 _ tn.-;v.:: .=---; ---lia- , ! i—.---... __,,: •........, az:,T.:, • . .. ........ „ .. .. -- = - 1 ............... -=.--... ;• .. .0- : -,-- -,!.'.......;- 'Cl''''-e.:-'-.1.: • •. .., __ ) r, -...—•=,-.. , ..........- .1 I. --L!': ° 111 - -- -1' - -- • t i ' 1' ''''-' ;.LINCRK NO-E'S 'I.'. I ••• 121''..''......; ,...,,,-,',.............r.rrAZZ.VST'.. , -'' ;.. ..v - ..a - ..,...r.r.,--,...--- r.r.r...•=rA---- L.' .. 1 -- 0.--.Airl , __. I 14:111,....1%::.• • Al- 4: —_ ,____I . ..-..."000f .7-r..---Z....-—.---—- j 1 • !17:-. 7r....;%-: --. . ' --"." •- .01.--E- y• -.-'0'..."4 : .:7........ 1 1 • .•••••••• ..- !4-.. ...=.. , •••••.4•1-V . , -.7._-•L"... . - 0"."-- J.......,. ...-..... - .I. .... I-• ----=- '''''.. -...,/c4k.' '` i 2."2........‘'..-... .." .."'.....- . ........'.., I Z*7.11...1..... ' r - f 1 . i I?i • .- 144 Z:-4. I -,7""a---':-.:7-f--:-.-.4.-7:-1:,::::::t: -(:_lf-I 1,,i 2.,t'S--3__."7!'IL't V."' : ,4 L, •, ,•.-. 1 :_,,,,...,_..._•_. • --„_--,.., -c'.---' ' l1.1 ; a . , .,-..-,•,......,....._,-• :... —, .,1_ i.... ,........-....., ''I '4 !...7.--.47,=:-...,6:-,-1-....•---..6-1... ! ; , ; t --- ,„-,•-• I • ..c. ' . ., „,. i.,..............- 1 I' i 1 d 40_ .! ..7::....L-_-..-.....=:74.:=.-.:--•- ; . : :....................i ! f: ..; =,...._,--. ' i- •-• ; mi •.......',-,.' :" -..:.-..,473m.1:--...•=s=7----•- - • ... ',:mr••••••• i 1 a :- - ''1 ;•,.=•;:sr.s.:..lsr.s,rxv..---- . I i . 1-. I • ..s..rW, • ri.1:110-0.z.-..-1"."..-,...--...--21%,..,, I t . !s.4........... I Ir '':v.-, ; •• _=-0:-..-i-sl-,--.-÷-t="4--0.04104....-•" '-t— --- - --- •—•_ --- •-• _• . , _i _- . 1 i ,P41:_, '"-. .--..---.07-4-....7.-.7.-.-..;.-z-A.=.,--:-- .- -- 'I:- 71.0-1-dae-rai 1•1•7 I an..., .,-- , , , -. 4-,•641,7: ; 6 - _:. ;------.1:== --.............1 - !..... ,.2.-----4.- I .,......, __. . . •Fi" - , * . .-:.-'-i-'. : - - t... -1.......-,....-.....-._. • -7-_- - .0- -0-7,,,•••, r';.71-.i,.U..:•-•,"--4•—-----. 1 _,, ....--- • i. , . . 1 t ...... ..".": i ..z..rf, FINISH PLAN GENERA/NOTES ;.. ..... ....-. i-..?10. i 4 ••• _0.:••••_,-- i 1 • 0- •-.7.-; - . II • ,L,...-....-...........-. i • "''' l .----------=-t i I . 41.1111 Pr .,.,..........................-.. .1!:3 ' '' -!--. Sr. ie."i.° c ,-3 iNITRIOR I PLAN GENERAL NOTES , FIFTH FLOOR , 1 , I , ....••-.....-.... -0-0••••000. .0 00 00.•00 -i-""-`;Va.La1.4:-. .., 10..-2.4,17.. .1IVX a" 'r=7-:: U - , .. ....." --------- " • .17-•„;.--.-..•-..7.-•-''''.'"••"'"' ! ••-. TETII FLOOR ritoSH PLAN .,1, ,,,, "..,...I.7;70.:L..... 1:-.......C.....•-, :!"i'..... =•••V 241,77.-' 1 i 1 .......-... ,, ... E.---___•—____,—.. !MISR KAM UGEPO MOH SO- PULE F..,11 -- . .. .•_It'. ___ 1. 1 PitflimS' 1 arr. - — -a --. -4_,:---- '18=mei 241011 VerCARI I twitlif It.--........ me---.... ac--..........1 1 •1.. +1111.I. i --nrilljE . -- --(D r,;Xt. •S-,ir...r.7.:.'I X -. 1. 111 ---.- lailti-Purpom b ........ :. ••• w ri 21.2"...▪ 4.2 taaddlliel . .7•1`, ..-..e-... L Nov me --- '' - - - 4•11."..V.IIIII ........... I 11.111w,.••••:ND .-‘,.... ..;1• . ,.4... 1111 ............ M.....,....t.V -773 =ea....1..••• ..st am a.*a• -L:--._:_.....-1,. _ -, ............ .....,, ( . ... — - ---- :-...-r.....7=•.-1. - - ir "I- I ____, - , CA't y 3t 2,-- - - - - - -:".•' '------7--2,-- :..---..- - .....,---•• aft.3 each r_ - - -, --,7•77 ............. ' -'''' -"" I--;ri:741-:.1 ---- ......a ...----- - - 1--- ••• "'".• "'" ar.ri7.1::--7*-1 ....„.....- II ,.„.,--.......,......-,,-...,.. --_-_--- •I, .,.,,.....,.„.„..,......m_. I-t•-••11 '• •" .4.1i1:7.4...7:1.r 2 . . 1 . , 4 m• '' I . I .,:,.., -., MB- -- . _. ..... - --- ..... - g — — — _ — . , _ ....-a ..., le ...,40.4. v11.6 MORK ,otts - ••. •-.• 41F".1_, 1_,7 _ . -.rhsz.2.-4=1?- .r-m=...,...r.==.1.wr.:2-•••••••• '`I .. .. —.= I rt.' 'I'" "••••'14.11 I r !.. •...••..m.•••.........•,..... '. .7....... .... 7:ii.,71"•- i. _ -I• ,,,-..+ .to:....--..........7--•-•-•-•----.- I.. g..... 1:..K _ MO=%V 1 • . .*__ __ _ —•- —'-- 7.74V:'-71---Y".* - .1_ II- -- , FWD MIMIllk ; 1:,•-•c...‘‘.._ ..,i-- '4' P7 ... .... : ———— - --- ------.-- ..,.. .......... : ,-..,, • 1 •J=T-..m.11,1==......,....--1,----.1- 1 .E.-7F.z...:-2,.=,-L-.....: • ,:....,...---r"....-.-•----- '"' CP EL? ilr....fti:.3.1.1 ,..4%._ ,7 I 3 I ::-- =-----, •=--- .--,.=.1,,..-:..i,,,,-.:-.2.-zr= _,..i...: - - .-• 7.) - 1 -- - - -- ."---------.- 1 I ... - — 7.47:..t.r.. ....L".'" . A I ..:',..:-...i...rf.a-7,---- ... - ... si.-zar.r. ,•• I — -.-_ "..-FF-P-•-q-....7-F...--.---,.. •,42-4...,...4,-.-....,..=•Z--- 1 1 •V..1717-',-.7-rt.".,..:-4.a.:....77.*. i.. _ „,....: - ....- • ....•,v.,..- ' • l' .., -,... •orel,..:-.,.I....,--•-----.• •rx.1.--47....,..,-..-...-...:-..-.Lsa- "" •••• ''' .inr"--:: X.%4 -...,-.'---Z--- . iri -' - z FE:---.11-•-=7,7,-:-a-----.•...I ... ....... .r.▪:-.....s...•- ;Ii....1•;-LI ! i, , __ •,:-:-.."---.7-=-- s •___,,_.- . _ ..,,..=..,,..a. ---. .•—-72••------. I .. ..... 7...."?..3.••••• --raPpre ! i , ,FINISH PLAN GENERAL NOTES I.. gr. ......• ':..,:,:•:,,Z.P-..., _.--.- _. I - . I -- h....................-.• I , ., ..I. ;a; ,. 10....-•••.........,-........ i -I ,•, .......SW. .:43.--..-- .,...=:_iii I I i .... •••••••-•s=.- =•=.....r. iNIFPOR PNKH PLAm ' 1 . 1 . arm P_ooR i _ g •.. ...•-•Cat =V.C.. X"-.I 1.•=.1. . 1 oz. 1 ,, ...--... •• . • ."' I -; ... ......&2:-.1 tra 17 r:, 4 . A-264 1 11• ' I r•c_47:.I.FT „LNR_ELNIS14 PLAN__ i .. •"....WA= l'Z.P.?.• I —_- _ — -- - -- . ._ . • --;---- • . • • . . p ..:._ _ -- _ __ it:::,.., 1. _ _ - _ _ _ _ __ _ ___ _ .__ _ _ , 7 rr'l 6.I ID "M M3 m \....../7". ....... . ) 1 S . . '--‘,/Th , 14413-Purpos• I ,. Porton Pacilty --• -; e._ ..-g ,..___ -i.•:::: . - ........_. .............. I J_____.,......L.,-._- ..,.-....-.-_,.- , ,.,_-.,..,,,..-, MI,•11....-4 ....4*-,,-••• ... •••...- ...• \-.... =We ' •-•-1.:÷...1 en , ..4,4tEynos• 6'014EE.1os.E az iii,ELEVeiON /I COLPISILLSSTIONS ,01 "ii 40...173.1.EVATION A c696Eis icy_ _yAra4 iii_Eig24.2_fEE AREA I I(1., Clty at .............-......... ....—............ , --Z=.7.. I I . . .....=.-r- ..__ — ',- __ .. ,-.. _..= ! .L 1 , -,d —. ,-..„, ' , .... .,:,_ \ ..:-I,.-- :..,-_-L÷, - - 1... ,:._,-.; ', A'---•-=-76•411 I ...- „...• ••••••- ---.vii 4_..t.;y611oN 6 vEsTili4E 103 ." ELT_LLEV.AlION 0 CA._kilL33_:112. ("4”,U.EVATION )1_g_ENL,t4GRE....LEJ •.7., •7., . -:fig .4-.44:-- • t-, -- -1:-÷_-_,_-=.::-.''''''' - • -_•,....-K,-- I H....4 N, 1 --, , , m ......,..... -Hr. ; , , "/-7/ --z . 1 * M—INN IR- - i ...T.. -,-- _.7_-_-,..._ _.i;....1- _-•- •_- _i ..,. _ ..i; -..L-t7. : • ... ,-- AT ELEVATION 4 Larat Al2..K..201 I ES . — sIAOUT2._ilVVATION 4 CASINE_MIOL (li;E..p.ATION 4 UCLISING AREAIIL _.:7,__...i ; . pm 'Itr77-7-.17t.. 1 ,...... !-- m r,--,:(:=-- - -- - --- --- - -y: 1 . 1 .. ,--..M.' CIEI . M ....,....t' M. —— :..._ — — IT 1 I ek. . 1 , . T----ii ._.,.... , 1 . .......ji 7 ) . , I : 1.. -- .' I ---.1 .--,?, 1 '- • ' - I • i .—,":*--',"*..÷-r C.-. .... .ji 114 -„LI;-,4! t -I', I ..- ! I 1 -IL ..: " ; I ! ) , ,' ."‘'1411E1M • , --—.-- ....—.-—.— =. 1 • m a ...... —.I- . —...:1•• .....- =.7e.-..— • 1 ,,,A,SOUTH ElkATION 4 0181LNAITING IA CiOEVION 4 COUNTING AREA 138 4:Fr...L.L1C.ENS_JL4G AREA M Lial)VIA,LL__ I ,.....7.:nr,•• -12...-..-mv:a ®--- ..=-1••-• .---: ! I I :Zt. "-WC' ''' .•=1.=... -...r4T. al ,, . I 33 i .._ .. am , r:f471:\ .., ,i_.1 "7,1\.. I i --•-•-=-"! : m i ,;' •••• 4 M -'33 , 't -,• I i . orla..7. ^'=- A ,''':,•.T,_ ' 1 " ••=,' 1 4 -•-•-•.4_,=. --.-:-\ I ' 1 t i 112 313),, N. „ ff...,,,, . 1rto\ 111 :.:,:1,(37/1ig-.71.4, .. , FIRST FLOOR II I ..7; 1', 13] *''' ' ''-. .'=."."1, -- -- INTERIOR ELEVAT'ONS . . - '-i• - ' --' .' -'-'-. i'L44M1:: :A,M11"012-'''44''. 1-36;4-,M3r4=P-1_!. - "V$11- 2t3411ii! - -: - .....-....-- ;L•---:',TN' -_c I i r E n/LL2.11314_,3 liaNSILG AREA III A-510 li 1 s.—.•••—• —— --— —--—— —...—_ PERK.YS f Tr- '- _ r7-1 v 1 NOT USEDwou.. + , . - . vtlny Faulty I7;;;,_c_.,37,ELVATON 0 CONFERS.2-61.2-61"..C1 ' SOJTN ELEVATION 0 lAT0 R8Y n ..- _ ® CRY ...-...-• - .�L e---!- s`'�" _1..-.._.........,__�,._.- L i , ! ` I_ - _ ENATION 0 iREAK ROOK 12 V fN EmArON A COIIFERENCE 2J2_ _ r` NORTH ELEVATION .6 RECEPTION 201 I �-. __ ., I r, __ _ MOM III -y�Y� 46._u' L _1 �X..-�.1r 4a W - 1/_..i I.'L . 'i !Ir Il: I I r♦LFiVATON FA�COPY 216 voR. EN yATON D CONFERENCE 20_1 (,)WESN EL VAt ON y�RFCE?*ON 20T_ ,c. 1 I ✓i 1 • I i I J Im `j A' �� NOT USED �. 1 I � i ti;ELEVATION_*YE$t;9uL 12 I �7 7LNORTN EI VAT10�F�YAr01 LO98 4,n.,-,..ELEVATION I tECEP�N�ot __ • I -----V— if �� -- - --�® i I -� I - • I I I + 1 NOT USED I iq I'�I -' e �]7`, 1' �� I I I I 1 I ,I SECONO UOR I •-- =r= —=-_-_,..-i=-=i! -- - - ! 'In' • CM / I 1 I__SU'-. I4 INTERIOR _ MEI -I t! ElE'/DONS I I `�_+LEVATION *WORK AREAL (11,E.A..5.ELEVATION 9 ELEVATOR LMY ELEVA'ION w RECEPTIONITA 201 A_Rfn I . 1. - ! m r--7 r--s: Paati-eurpos• 1 I ,--'!-- Mutch/al. ••Sr.`. ® !! ' 1/ ParkIng FacAty iLAN-- ',. ....,,.....,......„.., ‘ '- --'E-I.- '--..-t ---,I : ! , 1 • L-7 i'"". '--T--. -_-;3,_.. .__..-:._-- ..-. .._.*-,_-.-..,___ LI— — ....-_-_=-. ••_,_. -=_. — n \-......74- I ,i7:,?.(5O TN ELEVATION ,TRAINING ROO/SALA 'is•_1.431/110N 0 EXE1.11., V C011F-RE,,NCE 311_ \ZS''-• I City of 1 /17\ / Mara Reach 4.4:-...-..,-..,.... fl.' - -• • - M . .. -' -'---51`4 ' ._..._ .-.T.= I ara-‘44 ! _-,...e....144H-..4.4.4. -- - ' '..--1.. i . - ; ••'.4;1 ' -4-- I : _ _ ,:i. WE...7.ELEVAION S TRAINING R0011 314 ,•'-i-N WEST ELEVATION A EIREAXOU''.01;SGE 301 ‘.L..•/•• '• --srli:a '-..-z, , ,..., I-71i Tx .r-• , ..,_. \\ • _Lit _____.-•i IMIN Mann • - "r;'-'----. + i ' r • !' -- ---- 1 .-...._,.L.,_,.„ -- -1..,--•-••.- -.- .4-'...4-'..-L-.-.-.•- .. •4.-L. ; .— = —— ,....7..--7...1 SOUTN ELEVATION a TRAINING 40014 303 .13) e•... jii,E.EVATION l_l_gLZ.CLITIVE OFFAL 302 ‘7..., w•• faZ,NI1SED •0-- 1 ! . •:, ___. . . , . • •, -..__.„........:. 7....„7,-.7_ ,.... ! . 1 . . .. __.... , ,•_. --. _._ •..1 , , •rj I -.-..c...., _:-1----_°- ----, _.-.-_ —__,— -,-__-1-_-_-_ --_ ----- _-.- . —__ - ——,— .......:-. =_.._ ____••.... ,-..... 111:.„ ... i .•"2",WEST ELEVATION •TRAINA00914 303 Ns!, ...,... /-", EAST ELEVATION 0 EIREANDUT LOUNGE 301 ...-•-,-___-m-,--, • (NIRO AMR INTERIOR EUEVATIONS see , . ®_,NOT USED _ A-512 ' . • • • . . , • .___. A ------- RERKIAS 1 !1 ..-. .11111.11.11. .....,... ..-..-% .-.,..i..-.: I '• 7 77; 1 =MI •''''. 1. , 1 I _..........G" ... ....= i 2 2 1 Muit-Pcrpoes liunicipal Parking Faollty ' :4 .2•1 -.. r , ............... O.*OP, ,A a t.."...• a I a *sat dn.,'t.I.,..1,,,,L: . ,. .• n E.AST.ELEVATION I Tv LAO 405 r"\WEST ELEVATION a HER DESK 402 4 ... C411,04 t-\ Mani Beach r.. ......,...,..o...... 1.1-4 1 •, • . 1 , M ' M •-• • 1 '' •••' ' 1 : I . . •-- __= ' -'----i,,-.-ri:-°.--f---t--- --- . IIE..•"•„•"....•- .. , . ,, • • :- -LIAll ®/10.17.."1 ELEVATION 2 TEST LAB 40 ®CAST ELEVATION II HELP DESK 402 G., - U.11. • • 7:— ---, ---"= .•••••• i NNNINeens i • .' ; ' • ,' • ts-4-. - ,,,.... . . ! .:::,, ,7_.:,1-.I.7.it• ........ - I ..,.. rii, WE51 ELEVATION s ILA( LAW 4117 4r,WEST ELEVATION I WAITING AREA 401 277—j I =.-...r.T. . : - : , • i ' iS....::_„1,..... ',.....4.-4,... 1 1 ... ' I • . . .: .".., mg .• .,',, . . •/; • . ; • - Ark . . , ' ' I %. l• . ' : , G.1 • . "... 1111111611177.74:,::-:•• '''' • i '. ,, ,.-- i ___. . 1 ____ WEI I . '... ..... • A's SOUTH ELEVATION II TEST LAO 405 EAST ELEVATION /WAITING AREA 401 ...- \.!./ *,..-• -.."-Z. :-......--7-... -t-... .—, --, , • _ _— •_._ ...,,,,rmi ___, ,.__ j . -. ii \ .. . !',mi 1 17._- ..-- -, mmimmi- ;-"-- . i , , ..,. : —3,, V ,.I., ,.. ... ,,..,. .... ,.. ,s. ... .,-, -, -,. -.1 -0-.. zo...... +11-''i•,,--; FOURTI4 FLOOR • - INTERIOR I 'I _ ! A 111111111 -' ELEvAnolos i • r -- i7.7.,"-. .=" 77.7—. WEST I L'JNOI4 AREA 407 c",ELEVATION 4 LUNCH AREA 407 .... lh 1 ,?..., -•- .i ,..... A-513. ' . • •,- -- - ---- --- ---- - - .1 I Municipal wimp Fealty •'•I•P.- • • • i I''..' .-„ i • ,,..-....- ,,,,,..-............ e.31.,„. zS t:".NORTH ELEVATION 1 COPY/FAX 515 t `.'- EAST ELEVATION I ADMIN. ASST. 5C2 .,.., ' -.' City of Milani 3,••cl. - I `' '..c.. .T.„ ---,-.= —.... ......_= ' rE 1 i: -i ___-1, is =•.:11,4-1 ...,.......-=•_-: laillk -'47"1 -...---::: 14!„."ST,ELEVATION I COPY/FAX SIR (Th NORTH ELEVATION 1 ADMIN.ASST. 502 ,--, --•=-4,-r711 , mi :cm IOW cm ! m al m• raawararare __; 11 ! 214:114M 7 .„ Efir.a. : . I. .. .-.- _.. - . 1 . 4 =Inn WM I MER:. :..7?.' I j:-.' ..: ' ; .... ,..-.—....5...... , ,..,. * ELEVATION I LUNCH ROOM 509 @ SOUTH ELEVATION II ADMIN.ASST.502 ztv„--,-•:-..-41T. : ! , , , • • 'mo, am m I • eI—:.• i"ri.-V— .:1•-----..1.'4•e---'•,::--:---'.11,e l l =rgrpraa'm'• ly7,Ir-a..'-.• I. ii — II•; , MI ,.., . .... ••••• *4)171'H ELEVATION 1 COPY/FAX 522-A /a ELEVATION II CONFZRENCE ROOM 50A ELEvAnow a WAITING AREA 501 . .......,... ,..'-'9 i•••• till— -_ifasymwt i • , I i= MO I .i•-•- •••••••••F71! ._ _ ,..., 7 i ___.i. Fru FLOOR. , .__. INTERIOR „ i . • ELEVATIONS I 415 (--.SOUTH ELEVATION II COPY/FAX 522-4 eTi WEST ELEVATION 1 AOMIN.ASST.502 \.:.1.,' a'•,L.• „*",ELEVATION I WAITING AREA 501 A-514 . . , . , . ,, • I. PRRNIN1 ♦MITI 1 /'UNSUNG FIXTURES 11CUNT,NG HEIGHTS _ .. "1:73 r. R ^ T'� L r--+R i Y l 7." ..........1.N. ,-.4c.J �r�^ ..,b . ..,ri ^� . •/. ; - ~•s�j� _� -may -T. = �� A .,.... ▪ 1 r: Wit,Ci I.1 R`r��^• -- ..r 4 "~"•:`^i ��:14::•=774.1.1":"••�•• .• .• .• -•'_ = ELEVATION - 2ND,SRO. ATN !STN FLOOR MCII5 RESTROOMS en -TOILET F%LURE!ECM ::'"'^" ADA MOUNTING DIMENSIONS - -_ =-- -.r �-_ _ _ MOT _ __._._ -�� • ' ELEVATION ..2ND, SRO, ATN A FIFTH FLOOR WOMEN$ RESTROOMS -" /••••r.my=.. _.ii-lr.,..7" ! . 0999 1 M. Iii ELEVATION - 2ND, SRO, ATN 4 STH FLOOR MEN'S RESTROOMS T,ELEVATNNI- IST FLOOR RESTROOMS `� = DETAIL- GRA8 8AR WALL MOUNT f-•ELEVATION - 2ND.340, ATN 4 5TH FLOOR MENS RESTROOOMS J ELEVATION - 1ST FLOOR RESTROOMS 1 = a -xr.7RESTROOM ( �' '�' - — � '� +.7_ ELEVATIONS. ! l I SCHEDULE a[ .^.y.'ELEVATION - 210, SRU, ATH 4 5TH FLOOR WOMEN'S RESTROOMS ELEVATION - 2ND, SRU. ATH 4STH FLOOR WOMEN'S RESTROOMS �'1 ELEVATION- 151 F OOR RESTROOM$ 5 5 A- 01 A— 1. • ♦WILL ?�.•}7/PLilt�f�F+IPIREO YC4M.InC NE'r,M=I] ... m m -7) 1::, -D M W a m . „:„......7, -- --7...: r. ru+► 1 Ft I e •: y r.rrer I . ! .iy -- 7 v Porting FweV ......=„.-......„.......,..........-_-.-.......... "+- ELOVA^.ON - 2ND,3RD, 4I1+ a STN FLOOR MEN'S RESTROOUS Tr DILE'FIXTURE LEGEND:Z:7=4---.17-.•••• 'ADA MOUNTING DIMENSIONS u •••-• .-1=4-•.. .. --_ �� __ CNN of —_. �` __ _ Wand Bach NOM -- . . —�,�.••, �ELEWi'QN- 2ND, 3RD,ATH W FIFTH FLOOR WOMEN'S RESTROOMS _ -" Ai __i -1 ,� � IND MO NMI ilmr- rst'' -1-: . '7,„ji� S ELEVAT'CN - 2N0, 300, 4TH 3 STN FLOOR MEN'S RESTROOMS 3 ELEVATION - 1ST FLOOR RESTROOMS , \J+•• u r • Sw'� i�"�•-1 �1—�' . ' tel--mmummulemi „„�. til•' „,DET.AIL - CRAB BAR WALL WAIL_ T ELEVATION -2ND,SRO, 454;STN FLOOR MEN'S RES'ROOOMS ()ELEVATION - 1ST FLOOR RESTROOMS RESTROOm ,_ : TT ��-� .�a ---� ' EL:-IATIDNs. �-. ACCESSORY • ,�ELEVATION - 2ND, 300. 4TH a STN FLOOR WOMEN'S RESTROOMS U ELEVATION - 2ND, 3RD, 4TN&5114 FLOOR WOMEN'S RESTROOMS (.:ELEVATION- 1ST FLOOR RESTROOMS A-515 i u +_'• r I,_ I ........ 00 4.0 1 10 ' is I ( ) ,r, - it Ii IF ,. 1 _ ., ,.. '‘4, i i 7:4,....77.7_'_ii 1 i I V, II , _ -1 ..?, ! pd . gi . ,/, ,„ \ I lip , I !I,•, r u up mi II 11Nj "; b , (�y;!`� ..,4.. ll f!4 j ilii I l I ilii; II; .f ;, I �� 1•L�� _ , — .-::1'I ( ) ��� — �� (i3) ., 40) .�-'-__ •ra II. _ II,r F,h — — z :• gi 901/ftwinpm•____r i I sz._ i II 1i ( -r - _ •,�_! L .--- --- ice. _ r 1 I4.j , o ' s I�Ip • :r,,`INi jili jujN � ' +1 f� i ' Ij 11'RI !� 1 r � n �; it � ,,. z ,..1 _- . ,.j 1,i ilii '4;i 4 �jl,•, 1 ' il i•I 1 I 1 1'l til l IN �l �; 1,;1 •, •1 q ihs ilid Ir ,.;i! i i ill !i, ;l. !It * J n th1L — (0• / _jj :: I HI ' - .I ;; pi 1I IP E1a I1 I , J l1w ilIj; IInhl, I i.; i ii = rile I 1.110 j ii (1-')',e _ N . , : ;g . II il _, Il 1.0 ; k I { N I- 11 ; I I.. y ,!' ! j '. 1i 41, , i �1 !'!J xE � ri � i �jrs;ii�ill�riulp i11 hi( ;ViI � P ji il I ul i, h !;I'!I 1711 Ii U I� lGi,,Ili U ..i. < 1,1 i Wa/Y S I - .. Nl _.._ I 7.^ 1 1it CI �ii ',ia �, I- t :' it I r, 401,1Y 41, rc II1 a' ji 1 ii it —lai1•. 14 1 '.I ` li •�q r 1J 1~ ili I! f r .,_ �►� >,, „_- :1 �� _ it �; ; 4 ,1° I II all -.Illi' 11 !' I yI, 'I / i ii IE,r s 1. —._ .... I .9 1 ill ! _ I1 1�'r1 �� 1i4� �� IIS s �II;I; �_ i� N, ["? RERUNS «WILL IMutt-P.,m.N s Prime FFcW Nan&nal ,J '.)1. -==z. 4\CARPET TO CERAMIC TILE llr I _- - i.— ii,DETAIL -COIN ROOM SECURITY DRAWER \' U ••. U CARPET. ..1- :' ...... 11.7. MIMI NMI, .1 .:�z:�Q / '�" i i 1 4 CERAMIC TILE TO MANIC TILE I I �r I DETAIL- GWR SOFF T y - =-7„r� CA I /� II jr_ rs'- I =a +1•••=b� - - !' r '''-'71-T t U ^DETAIL-CASHIER TRANSACTION WINDOW VCT TO CERAMIC TILE I, _ Scam l+/ . .- DETAIL-GYPS SOFFIT __ !I I I -4 ` ri CARPET==+ VC:TO.CONCRE E 4,60.. :vrr T'.71—'- .I^--- FLOOR ....„1,-,./. // `�`=p.� - 1 I .-. !I I ;7- TRANSITIONS ..�., .� '� _I -�I, 'I I - DETAILS /.DETAIL -OWS SOFFIT ®CERAMIC TILE TO CONCRETE /'1 CARPET TO CONCRETE �'.'J ' `'J • •,. A-324 I -- --- -- —-- FIRKINS ♦wl L- wr-woo« Municipal • Porting Facility � r d-1 I 1 . .. . ............_.. ............_.... in Nlant Basch I '''. WiVI =".2.ZZ".''' xz'c, •s.as : �._r. .—.- L. 'moi -" Ei= ..s. _- til n DETAIL••BASE CABINET!SINK DCA&- MILLWORK•LICENSNG DESK MEM IP t I- ri DETAILBASE CABINET ,,, i' /Z DETAIL-MILLWORK 0 LICENSING DESK VI, \ .7„..„.,..... '-':".i MIMI i ' iphi, . .._ ...... ........ _ .....:2,..: , , . ,..i , ___.) _........ ,_ ... , _ ..: , , , . • • y M)ETAU MK 3E7AL] T MILLWORK SECTION . r'1 MILLWORK SECTION ..r T , �: ENLARGED MILL'MORK PUN(FIRST ROM -_ I 1 A-525 I l • GE�III PRRtIrfnv ♦nu 11:SII L . . •i��e. IL�����.-� ' t •,rte .•' poem;Facility SO+✓ o i o ' 'iii�'� -..-.- -I _ ._ i— �� p City of 1-- 1- — iihrni Bwth H 1 trat o o = CI _moi ,---, -- - _ 1 pjp�►p E3 r---c11.-1 w tigerrRR.1ua";r _ ori. .��q tar 1- .4.lifti iii 2...csos , s7 I0 om`}• � , Y . �yt�l.- Iorad cal ,,,,v,„4,4.▪ ,. +t:: t* x' • =.rye. - C.. .+�. -..>;a";-Q; al= i ammo 42(2190 4 - __ _ PE NS 11 I. a' S =2.1%.:1414.71.0 ICM 111I,I k • •! «I IE?3.2.-...r_r:ms I1, tali .tea, Portiliturrictiolw Facility 1 •1-'Re_L3!�Y_ --... --- I .y�"Ixn1 •I • 1- '--- •-- r. City of - t 1 . 1- �.� ..-.4--,8=. (�_ 1',1" 11 --- 1 mot Weit ��. IirtFa it'_' ' --T--,---,_ ^ - moms Ilii 1 I =1 IMO WOW II ° .� _�TAW- • TI 711 L 111.1■1 , i ' II IE II,lel _ .-m. ter , - !�!. I I REFLECTED 1 I '• CEILING Phil ' j - I I MF SECOND FLOOR AIM i SECOND FLOOR REFLECTED CEILING PLAN_r,. . . . _ _ ..__ PRININS II•7112441 comms. , +gill. •1 0 •••••• IZ.....::::.=.74 •••••••••= .1 I — SIZI•Zatil=.1 ;r'S.111111111. I. . = -- . .-•-• Ma s..-s-z.2..-----n= Purim Peat, ...........-. . . ...- arr..-.. 121 .. fit--- - -"- ...gm%/••••Iwo •' . ''." i"--V.C.:Z:.7- ill l:.„ra 41111°111- k- i• i er_Li Eg-Elm _ my. ...... ............_ c_ __ _ _ r 1 143 t ••••'.......V.-..7.:= ...... mr- •........ ...... 1 ------..=-- ---9•:7ii 1 , , ...............-......-. i. ....,40,_,_ , / ;1 J1,m1.m1 WM • 1 ,..e, .t. , ..........7.= ..=.1441. P.17 a a'SZL4. ' iMI 4- ---- . j---_, ,"zwilanzinit.ur .(=. - -+- — -"/ / X : • '. - '--e---AR • - • ... .— IIIMPOIOND .,.. 40 .. , •, .... ____._1_ -- ;... R----ir '.1 3.-----r. 2.2 Lon . . , iit,- -- -or a-. ,.......... .,.,. i r=tz 4 - - 1M... __ LI. - ..r.. ...... gr.__•_•_._ liw' .. ..i .!.• .. 1111=- ... ' i . ••,,.• i ,___i . 1.17-ECTEll CLUNG KAN - 1. MIRK FLOOR ' .. allir.flu :............. ..... (:) --......,... A-612 1 1141•0 FLOOR REF-ECTE3 CEILING RtAN ri'N .‘ • ....1. --.•-- ,..._ r...-. --.... . CILMIG LWOW _ _ — PERKINS 1 twill;', .•€‘1'' .i E - ,astr.--s.-.1.•=2 —.-z.-- •1 1• .-•--1 I 3112,.2::::::"..4.-'7...":=2 Lag - . iimiclio•F Prim.'F•clIty ............- ••••••• ••-..,... . =''Mr.." ie":11,7:41.....=:."." -.,_.• , 4 giii , • ° — 1 — ;c.v....-.-...—._—:-...... ,z._ ___ _ _ ,/ CIty ol . -....... •• •••••••••••... ©----— — — - a —" 1 1— .....9..., -----.—..—tz--;.: I s T.,— -------. % ,•••••••••r•••••••••••••• IL m• j=1 f 1 % 1.•••••=4•••••....... .... .--....... ---..= ---.= ...irr tor 3.7-4E.-1.7-47.1. 7 .-- 14.7.7........................... ...__,.=. ,--...... . — , Ir Ill --- rt-1 , '.111MINM NIP 1 4. lano ,1 r t • .._ i iig= . • I 41 1 I LI,r LI LI "$-':----- -t•z- . . ,.. _LI U . -,---KI'ke .. I:— — — --- — — 4 I M M I M • • _11 = J 'IC • . -'036'.g ...,_••--- , I CIIIIIIM .7 -. REFLECTED .11/11111111=a -.". -'t CEILING PUN MOTH FLOOR --IM r.. • I • lit=1 k.... ___ REFLETED CEILING FOURTH FLOOR:Vg•Ct ...••.=......... — • h. OINXINS 1 .., , {,.. . Ori: 111105,00 01112.1001 14' ,ev---—-— *--- .aqinsuilL. +WIL 17. :===. I III 1/1Ir min- ,.•7=7:.-4.7..., I iii: itii r- 11 t= —- a t-_::..-_-.-;:,....- tiliritiftmo Alit 56.111-Pwpos• • WMEN,RIO.mw, linicloal ci— .afjna FM11:::2:=1:122 MA— 1:MEC Parkin Flwaty , ...,..-— F., i& • ,, ---'osnr.. 1317-:-"7"--- a ___ : --—-• •t=ate"' •, r• ,-- Efi-7::::-7-- ry‘ EEO - ----- Mfiblicrl Pea i,I--Ell=11•1..it cityA c____ __ __ _ i ainillaallP7-1: - --- Mini Eleach 5 MT.. •. ..••••••••••••• 3— —-— -- in 11 1011d1111 ---=-..r...-= I - ------a i t - --- 4,1e .122' ISP.17-la:11.ZET glr I inalmise I I. KT-!!" rEMPINNI _ -- - ' (g_.... _ -. ':!!CICricno -.......= ' 4 WARM . I I- -..... mit( I a a ,a..-",, ,IIMMEIMP - .......—.imm—' 1 saso I 4 issmumna 1 ti‘34:'."'' ; IlliIIIILIIIIM c----•,:r. 1[77 ; ii...,...m.,• .munnummmsL9 ';111111111C11111 _ _ - IIIIIIHIElll io.t.'" -.-- — -- -•- --Milli=cmr !num'mull r• 111101PE -, ---v IIIIIIIIIIIIII -Ps-- ems 41111111111111 1111/111I1! 'MP umluni mniiictr =' ''4'4 . ...7. I MI II , I 1 ,Iffig111111/ 4.;;11 • g-- -1- .111111 I IIr- -- 1 li1ii11iiPillan zg,! ---:.-7-2 C REFLECT.E6 RAG PUN 1 I ; 111illgi? .-4.."-r- g22 F11111 22 t 1 1110110111 ."-.A I" 2---- , a A-444 RULiCTED CEIUAO NG r11714 R /PT.AftN r _ _:,._ '1• :-..- • : ----- _ 000.;artouic 'limns ........... 333 - , . .,,,..., ...,.._ - • ._......., ,L,...„........, a >e _ ,, .... • •JAMB DETAIL JAMB DEAR. ---; T -i. ®'a . ' � - .I �• - MEAO D rAll . .'• '• .. t T. _ - T --i'-"" - 333:r* a 1_ _ i' - f .— ,{ �(r l'4�: _,C•i- - - A,}_, . . !;:_%•_1 i S -77 •�.r rf• ! .. I�_ +i- . 1_L r •SS: ��.7. --- i }Z-.i —�_ _-4,. �_.___-i r:.:::;.r..; Sr JAMB )E?�411 - RAMEv?40FILE> '_ `��' - t—r4,- ; •. i�__L:.1.':-1.:7 ---"" y tit __ ----- .. j_�- v7_ 1 - s r i --- 1_ i •E- 4a i.I ;1'1,1' :1-,i I _ t .�; .'r i i . 4-5777 3,..I`� =_ . • LC!II•••• ......----- tr.. ------ : ...::. • ci 'm : •wB,z'6'90- Mf :^�VERTICAL SECTION _ I- DOOR FRAMING �� •••- r� - D0011 Yffcv.: I ;r"rL-j I I! �`-JI i ^1.SSIC, _ ?. i ,I :+QTS' ti--sa. I _ r • ` M3 JAMB DETAIL .-3, HORIZONTAL SECTIONSM.a A.RO=-Or stony r 12-IL I Pi i ' i M '"'- . i • i- ..n.... IP iCf1E7UlES 1 ..3,--:,,'!..1-4... T: _ L L71 LL33 I f (,DOOR t FRAME TYPES L. A-312 .J .•-. I` - .. DOOR SCHEDULE PERKINS 12 .0 alof;;IT; _ --0 MN•211.1111•211 —> Wit..__. ==a: ; : y M±� +r rw�— r. �r n __ - Wig DETAIL ~ n JAYR DETAIL ILL— -`'1Er4—E".-_— .n 'I r r-r 'TVL" .j y'_'�' "2:-. — 4 N AO DETAIL 9-- � I. _ ? SFT • ' ? rru -7-17,1 r.• Yw� a�1.. ... 1.4 - CRT at r— -- i' r,.-' ..o r.r _.--_- _--;_3=1-,.-4-.__,. ___:.I'rb_ 1.4_`Tw•�+t re: N Lir_.._ Mai waR m. i•--..na- =am •' ����9.=..'ri __m,i.w.� - Y '_ _,-s 4-„,-. �T�. —__+ ='" 1LL _ � j_z- t�-•= - `fes 17iS� :S JANE DE'All ' e FRAME PROFILES 7.7•.*r-_ -,_ r,r .....1 . L ,.n - 1 man x = , si I ... .,.. rr ,..„1,,,‘,......„M�.w v .21 a� F-i r'. i- '61 ..rte-:.'•. - �rr.w Y - _ u'ErAI A , w-.m 1 :r i-r +# as w•w I1=�-. ,/-�---, .�. fns�.-r r �.a�•..Y f.•. MT_ 1-. , �.VERnCAL"SEC-ION d DOOR FRAMING - � ;� S; _Kw va ice: .. 7...1_7.&.!•-= r•.1A1�N�� a:WO. M�Yt- 11 a = . min r-r -a' {_ r__ �,•' r1 — I .- V `I - •-< +-:,.C"11—"'1:. pa 5— . /• LA j a DOOR ARRREV.: G-].AMY DETAIL /--HORIZONTAL SECTION ®.COIUNG OVERHEAD GRILLE ? ROLL-UP SHUTTER ____- I -..' 7 -.....--i= ii- --. - ,---,- .,---1_ .. .... - - sa Pass-. 1111 24 MC 1U.-14%Z v >.. -. ..M". -.. -_".'C'n .�. a.AK a INTERIOR DOOR 1llly an.rq,,..arts ^�, T • ♦ ju— =., .. _ y SCHEDULES _ :D�a __W __ •_ � � R vOiEi �jDO �t �....-� ,. .... al. .1.-.. _A 812 DOOR t FRANE ttP`S ' -r-_ _ . PE.wt M= l'.! 7.1-.7.. V _.�' _ i W i l l r •; .• �... I 51411 O.i W Dt' Prtup fmany � a. ' _ - : o, _ L. vsz`.+: ase 'nen i/.3V .I - ( v .�+ 1 Mal C Saadi • --�i LKLE'-:: �� mss_ �' .=11E, '= lal,. ��I�' ,.mo w•�.r . C+ I I I: rs. t 11 1.-._--_ ' _ . I":-.' n."., WALL IYPES j ,-- I t . 1 ScRcaxs l ! •y�.r- • . • /MINIS i aftew.m.0 I- ".. I..,.....1 Z...:....T.::: t••••.••,. e ' .""r4'74 =4 ! ":.....": 7=-."'•= 1; : '="... ."' ITWil*.. .44..7 V ' = 1Mai' +WILL .........• ... 0 ....E........= sw. • ........ , , i ........rX. 1....,•-, ........• ...TA= 1. MHO, =W... ....-- ••,•• ......• '....".. 1 aroll ••••-r, .— c•••.3. =::: ft 0 .m!.... . I MM. ....... .... A' '• ...XT..: a ,.-0, ../...C.L__ 1 . -10,• 0 arTh. 17.79'71 P!do ' Fr" "I' .1' C311 ' • " . . -9.-; .. I ,..--•-c-ei.i fr-'7 -,, ...,_. i L..-1 ' .. L....,... ••• ..'...g. .__i_., . •............... • I ...;.....; . • O., , ..__; ue.__.a , • c,- .• ......_,_......__ ---.." 0.;• : ••-•''••• •'•: ".. ' •-........ .-...- -- .....,.,_._„._ *. ........-..—.-.-. Ca ...-..- ..--.......-•------... , -.--. • s•-•••••-••••••-•• •••••••'-'-•-•••• ......= .=.„...,......... ..............- .........—.. ..•-••••,...... ---... 1 .4--..-•••••••-•— ........:...-..-.........-.... =••••.....,=:•-.....7....%. ........,... - .....---. •—•-••••••-•----- . . • -.......---- - ''-'-'''•--Z..---=..= . ................ ... ..,_,.........- "•'-' ''' .1i.ar.NIIIF. p..* •............----.... ......- -- ....___ .....„........_ ,.. • - • ,,........ - ..-. I ---:ir/WWWWWWIL :!I•MIR*MIMI '$ PIMIIIMRIA L..,!,e AM/10MM 1$)14001100.10.1 ot.!No. *a ........or . ..• NO .=:•Tio 6==.: 44. ! "'..4..Z......7._71. L.. ..._is 'et-: """......,=...::._.= .... .,_:. It : .......,--....„1...-. ___,_-:ST ; =,_....-. .7-...- . •-•'-ii= Ve 1 ::,..4"Er f ..". • 41 1 .::=... i sa=r- if , .—...... = , wr . ...,....... .=-. . ........•••• ... _.....,...._,..._ wow ...... A.''..... c•••• ........ .••••••• . ........ .---. :•,..• ..x.,;;:= :.-- 0.,9. • 3„ . iarrliTi ;-0?5, , ; . •..... ,., ..,-•••:,-3- , ...ar=1. ,........„....... l j .• '. ._ .4 , `0-a. '4 --A.--- V -TM c...,- • , •o..-: • ! • 0._ -- --==.-•7.-...==.=-_- ,___ '---.7-_-- I --- '--------- •— --- ___._ - . • — ;,77,- ,It,--,. , •-- Nt ,s..- ...- • .----- 1 . . = -.4. i ------- -- — -.....----,---... .'''-'7=----'="-- *-- -‘7_. ......-—...- ...—.... -.T. --- ' • -.. . p....r—Ti7-7 7,- x•twro•wWiL fi'g MVO CUM liVOIN//111171L ei:rTeartif IE.. 'ij,MIRO NM :Rale`.ADM Hi3. ................x..........am.. .......• iv i al....e= ••• .... ,a i ,,-=.- j war 1 ....-= tz1=- le. i au sat ...V.W. ''"•" war ••••-....... . """'• ...a •.. . .... . "•.'" 1••••••• -.....- aor .....-+ :: i 1 *-' '.• .I n,. i,,...1 i ' I 0/ I * Tjj1:*1 . H,.\., 1• =MI= 311 .7.. I 1., 711Ei \ . i *=,_ No „_......, • • 1•.............. . I:" .....7...'.........7... * 4, . _ I ..:===_• _-- ...--.......7 __. ....... ._____ •— .---.7.-.-.= ----...,-.. -1w-'•.'"- *1 1-.=• -s----=.--__ ----- ___ — ._ ........___ .— — 1.----_=— _ ____—,___ %-:\MINISOIFSL 7 irk;MISTY WY. /7-•iMPC•NM '7.`MIMI MIL 1 r,,...r.r..I. , '..., \..) I,._; \..., t'_/ , ,----• ,ss. 1 ........ -•-...- 111 ..-----7-. ,L7--=----=--. — — .. --;,.; --- ...... — .... . — -..... ----; -----.-- .. . A Ckl .1 All i. el „mom r. Va :I. • , . I : L.... ..... li 4 .L ...gi •• 1 E.-•. :• 1 • in- , .__ .______ •._ .....___. ;..._....,. 11!.. ...maff......... ''..----........---.-•.° ..... .2.F. 11. I • -----.-- o...!•.......... • 0+.... .. •...... ... • . '"'"-----4.--IrloREETA517'11.rsP_ MATO,X1,11. 8..=•••ommr...••••.mo ..... ........... 6 jwirscaras. .—... •••••=.......m................ ..... .. MMINOM...._Intn_ i . .---.... e/011t11C094. •••• eMM.--M--- ...! A-8 32 _._.... I 1Q � alit.tl� /IIU1I l,jl [ � ttlI! � m cnrYt• y r✓E,i li[f� r= t N I •I d. u VJ % I1ri ! Ill itis ,F t Li Y i •1 1 !! � f� ;t% CIS' i!i i! 1 i ilii !o p C, g 111 , ; Ibli � 1 �Eil ;t,.,r � � C) j I i I i z '—I, Iiii141illitltiiiiiiiiiitiiliiilii`liiiiiii Miiiiiliif 1f fiiiii a->r9 - =. r11 rl [tttf rr/It [ [r Ilrrr It1 /i r4rrir/ r! r 'f 'i It{ � I p. iiiiiiiiiiiiii 111i11111 fiiiiiii Iflfflf fliiiilllfrilllimii"siiiii4 —0 iilljfigrid1 Mid P' '" W111111 1111r11{rfitiriilii[i[iirii[ . 11![1111111i� JJJ /11[ itlrglt 1 11i1/111irr !////1t/ 1 /if/ �(`� �1[tttt i lrJ;jliii++i� m rrrfrrm 5641464 g T HMI 1111111Za !!!li�tti kRF 1 1 1 !1+! III CO ttiti /1401 '11I ••-, : ,. ,.• • 1 alr ci 1. _ ii CD i! . ' :(_Ir e.I. l�i_ :,Ilt 1I� I i' r. ..t,ilri I ilVtikururinidnlK [ =yIs�i 1: ' /:Lil;'li.'!1! ?�:Iif:ll{IFi: L1 g .Y I` .I. I<�:l 1 is 11 i III m 1 F1: j; i I!I 0.1)1!I'It Ii' a 1:f:,.1I a, / g ..fa a` I, LIit1, :I I.LYI i; �i I ISI. '- :ra s'i# Yi #Y/ } ilCu 31 t ila; . Li SR �L a - Jf t a .;,f "'"I'''''''' ,.{- r I i I I 'II I I I. IZ ff s ! Ili @ I i 111 11 LI: € t!'ateti�1iiilf{!�!It!{i:il iillt'it j?i E1ii`If {f 4+'t;f1L L►t1iL( !t as + rt.'4;2t4, 11 4 I tt .Il. 7 r{{ t �da1 ii i{ t l,l.ti�Iti ;t i Mi 1i f isibl to ,.'4 Si i < .- i i 1 .1, .I'. 1 ' ' a' 1 L: {LY . as i 1:' f.[ '1f L{ - 1 I I I ;A. i sirlr rir r :ITl •l11 I i i'r,r,r it r' Ill .. I :ajs• 1 1 , i . I iii. j Iii 1 ••M .I i I `1.1 Ri I I I t 1AhI '.�I '�+{I I •1:1'1'111111°1:11 {I i I • I I it tq, 2 ;. I i•`;t,k! �iillli�It t;i; l ! ,C rl�; 11:1'1;11111!• :;1i I .I : AI 161 • 1 I I bb I I il . tiI {�l X I ' i' int • s . l _I. . ...r_, 1 Iii " t I 1 O ® tt 3 3 ®® O O 0 ® 0 A ® O ® — —j _ ---T .. T . -, .. _ -' ;i ; � --1 1 , 1 _ y 1. � 1 ,r_ I `' , // . 1 1 - -�- H -L-_I -- _- --- _ ' _ , Wa ~ ' I ► -- ~i -f - - -�-- a --- _ ~:� -E __ s { s �.r_.._ .. I Mahar Plass ,I ...IF.: .111M.•an PiertIng i 4 rie M.VOW HON OMR 11y % i i 1, I ;l Ia` r 4 eel" L1- V I -L M IOnr•Yn1U S Wi a�nxnmn. � aw .rw. a .a0 J991omp9IMIN90 9 —._____. _-- rNY+w1w `� N - -- - --t I 1 - - - R ,I t _ is I { I i I 1 1 , 1 II ! I' 1�, -. ! f J I i 1 1 L _.- it i ; !, - JIM,— —_1- 1 C --4 ��.1 r.ar.a.w - ._ .. —0 x119 9/gesI :11 i A 1 • DN104101111V{/ - t I;,I �, 1 . v.............—.. • I t i I LIQ ! �._ I . : I * 'r i� E . • _� 1 _I R I c! 1 ..=-17:-'7-. .' :_ J, I_. .- --! - -1_ _ I = - - - - ---1 _. - � o I; , I .:i 1 I 1 , I t _'x imp` r rC ; a 1 ' I 1; . -.o --- - - - _ - ---°•-- .1 Z' i —• 1 '1 . i 'i�_3..._.- �.-. 919 I I ! r z s I 1 o o g o 0 o c r c �o' e 6 Cc All b 3 3 O O S O U G © © O 3 ® O 3 ® F- !r .. - _ - - ;�� .. L � . rr 74.7.._____ i I 6 I M y1 % . i � I ra � I j 1 ,, � '" '9T- I i I • i 1 'A 1 L L I Ii . ' ea ' ' 1-':.��. ,•• • Anatol Plass j /r ' Shops soul ri, , ,. �� 1, , .Parting. 1 • ! r ► ' ' t�.�rt--�.�.4fff"' rt r1 n n n \ -- r--�-t e . - . 1= r tis :j;QJo- I 1 — o ��, R. PMa - A ... , . • PLC 11 • _ = . --iT-10X•11;1: IMAIIIIIi°.01.11.<0 V"0"kJ tirqS r . PY il. ' \ I. \ 1 ......e..- / i 1 1 , , , _I . , I ' 1--....i ,- • _______F=i I I,, „! I 1 ! 1\ I 1 I • t it \ ..m.m. 1 I1 1 I 1 . . : . ' I i ./ ', ' 1 : 1 1 L.-.......... 11 ' '.?0'.lig k--1,_ '-,' 11.1.--- km",.......% —- _ ____.__,.... - -....-.—.... . .....—... - 41..F 1•••••F 04C • ; dmatm•••••••_. 4 ""2E• put elloyi ' ri: , ;• florid aouauy I ' !i ! . . , i h — : , i 1 ., , i 1.. i 1 . i , I . i 1 : • i 0 .....r..xlei L — A ; ; 1 . ; . ,-,„... .,. .,—A.. .,.;,,_ _,.,--....,.......--,... ... ...—..,.'. . ..'a;7,_-4.,-,--r111:61:12.1:111=111=11.161Mc C7Wa' z ;- ...‘ - ,..-.--.--.0 '......,='.. :_ ' ' f I! : ......::.-=..,: . ; , ........_,, , ......._, , ...:--=-:::--t-... - - .............1:-- 4- i 1 • - ) - -"' ' -I' , I 1 , ---zr•-'4,4 1 i ! • ,, ,.; , ' I : 4:-i , . , e ....,., , , I I i ! I : : , . . . , — • l';';' 1 •••••••• Oemc ....,:= ..n---..,.- --T mi•••=••• -,--- • : ' • Marma7i:74:j•m."%aa 1 I .....-* . 1 '..-4.'I OW....'" I i 1 , i 1 . . •1 ' 11 •Y'' • 1 , i!iirmin i 1 • - . I.1 i I. Iti Li 4, , 1 t i . ... _ _. .:1: t . , ...... -.........J-- T, - ____, , 1 ,-.. _.,. .--____.1,„t__\ -,__ __...,.____ , ....._ _ - - - -L44..-.. .-•-....;---- -- A-----, --=-.--Si--.' A A-4-- . Ar-.. A al• A'V ... , "vri----70,-' !t . I . OWN i ' : ' 1 ,j , , • r-jrn 4,, tIO 6 ! . j tzvy_ — ,I, . . • .. I • 4, 1_,....4_,_ • IWI .• .. N w ri_r, ..Yl — U.. 0. . -(-..K _� -�- - • . _ t1401 '! 1 1 . iysc,2:-c ri l -. �.--.—. t ❑ m I ' ❑ - - , ❑ Ga, — ...,'., dachas Plana Parking Z 7 — - .w . —IIheya and C ar anra.d. } _.u.e.t_. n..........N.M.! 1 r; ry awn c.e. t ! 7. 1`I '�;! 1 I - i I I r- - _ 11 4.\L_II.-H":„..____,....1.3!1:11 i . ..rat--=--da 1 N anrny�nt2l 36211 Flan/PIN 1 Ca-.m 4..ra +A-~31t - • . . ..... Imosomeu.so .,...I, ea+ Vail NSW WINS Verna/11311111/41. —=-1L-= 1,4 I , I 1,—................ , . : ..... = I . I -,,,,:?..,,, ,! .,i „ ,, ! • ,,.:_..... ••,,-, . , ,t ,•. 1 1 , • l',I : , 1 : • 1 :1 ! I 1 • 4...-.-- 1 i, 6 i . • . ..... -1- 1 , . I .1 ,,:—, 1 ' 4 ' -,:-..:.•'_1'-..........---i. I amp Pima..X •.....,;41.11:. .7.—-,...--,....- -...-. ..-......-,---•-.-.-- ..- -...:.".r.. : , -----..-.-- : .. __'? ' • 2 Z ..-.-MIL,11... omm.ILOMPAC ......,................. BUIP11.41 .. . . . I. Pus saioan i , ,...,, —, , , I I j 1 1 I i i j 1 '1-1 MI/404.011V I ' t . I i : :,•,. : 1 .1....... . .C.C.771. ! :I : i • i f i : I , : . I , I I 1 ; • I .. . . I ii ......., , ) ......r. III •...,..=. , I • r ..„.....---....z.= I ,7---- ....._.1 -....-.-..-4 1 0.11.:17•••1...4 1 . ..........zr.............1 ........."=rj: ' i . . /.................'''..) . : 1•1••fti::4 X M. 1 : . . • all•W.•=•• .1 ‘, ...... , . -• ;:lie...---.." .-...-.... , ,......,.....T.:1.-,-... 0,..a.„.. I . •„M'CrIT,,,,,, ; • : . 1 1 _ , 1 , .,.._.— ___,,,_ .ei, I ...• L. , ...--,...1"-.. A ... . ova no an aa . J.'-. o ) :....„-Al la, • . • 4' ...,_____,........ WW1 41' 7 .1":".....:•7•6••..r.4. F4' 77. 1 i I , I I • + C._-_....1- i- ;71.-L-JI j_ i "1 , ,..., Ng' - ........ . k .):1,- min • —.................. .-...-,..L...4„,___ =At-2-— f 4 ........• I ....al''.. •.•--• 7! z.:,.......... .......... - ....... ,..•r... ="7:7•77.7. .7...77•-•••• I -...........7 1.•••••01•••••• . :?....".":"....:74. I ,—:treus: _._=„--....... ' A ‘ L----71-4---U 0 0 \ "-----..7=r,,......---...„ . : \ . (--"‘ I I • : , _ . I • ; I • I\ Angkor rose 1,, . • Skoog sod ..•••••••••••••••••ii riP'Fari ary.7.17m.773•7•• 71•1•.......1.(pm* •,... •• - i 7 .. 97...tz mug Com ---t-----1----'7. , • ' -.. \ 7 7. 4 • I ........... ; . • ' ' . . L r _,,,,..7-77--,--iV••-44'7-. -air.,;.--A-A-ma7.1.a•a-77 0 7 I ..• ....7 Pd Ai4 •....... .-.--) &PRIM Roof Pis II -_ -- ---- GamuallonC.,•••• = A 313 l'r re' 4 4 .. is ---7 - -'-... 4 AAT --- -if-7.. T _— t. f_, -. • T •, •-..,--_,. .„...- r E p..0 ` tr":1.— =-.tr'{-. y.wJj6 ri''„' �uy7s� TP: ovic' r - .�L{ f mac �.� �' �• ..�-- —,_. � -.T..rc _ _ . _. •[= _ __._ •, .••ter .. _:. .. ..:••T •• F. t ,e,, l._ ,•v_ _ ' L.T."-YU-.W.vuss.m1 --■s -ac..•c.s.•. .1G, 1: : .. s C a a G --a•;;•-G a--a "...r.-::-75L-C)_ .a•:j G a . G — Anehoe Place . T�� .Q ' ShoPa.M .�.; _ .�. ��Q � .......„...1 313+ �T I Partin_ ¢'. — - i - * ---- ' — 3 — — - C. s si.r �T '�' � 1---Iiia Dadoe flnrdia A N.r•I --•--x_-. .._ .--�.a. ... I.- .-__ Ozooraintiotorm I 'TWO'14FRC4EUENi OCCN:CNE�JLc 11t �mm . .— _�'_s x �' ' a 1ii_?i999iri______'� .A 1300, ..____• ____________._._ .. . , , • . • . , . . . ----- _ -. _-__._..._. . . . . _ .._ - ---- , • 0' 00 , .......__ n111 .2,.....-... ..-,..:::--------.-------- .-...- • . I : ii, r • ,...,.-„.,....,...--,-,--.........,...........„...........„...„:......-c,.i,,....„:„....;-..... r . . ta. .!..-: , • ---..t••••••.** , natt,--,:--•••••,... • ; 41.-'''....- ..V.........,-,7.2....=4..-• - 4.......,..14-. ".... .. -. -11,.!--L.. . 'L W 'li /''',..•ii• .' ' / . • ----• ""'::-,-.....;: i , -_,-.2_.1,4.4:4[JI..'2..-•*:-..-Z•a--.1 ' - •. . - - -."-.;.- . ---; ...... - .-'' .'=""': ' ... ' - •- --------'•-- • ti.• •---•.- -11113:+,•....." -- - -----I , ., • .. • -, f --"'T . '...-T -----IV ' 1 ••••,:..•'. .77. .. . ', . • i! -. _;:.:1--_,•...1:-;--1--_.-_--..772- _-.:__mg. .1.1-1 .. _:711 ..:•.-.J..%.._ -m- .'". 4 '... . ..•••4.4 • ;.4. , • . .. .'". ••• 4•. ' 4.• . ' ' • r ' ......4.:2!".1k ii'.-' • ' .........'.".. .474444+, -.54••••:;464 • • • 1 ' . - :.I .•••• .- L• -41'.,,, -____,_....,..:14___ _.__., ......, ----'-'". 'v* ' ,--- -- ---- - .." I ' •i. ' •' I,. II /•••••:.w1/.I1 4i,......),,r.4.... ....j".. .•-.. _ •!' i ,I ..-• - :•• , - -:.77-•-•--37:.-t.-...-:., ' . ..--- ' 4-*7---' . .7••._:•• „.,....4,,,.4.,A.,..,,_....,..,,. , , .-'1 - •-.7• -.. : - ••r 111111111IMINIM ' A..."4,4,M ''''..AIL•-.".47; I . .. ...-- ,7-.7.7.-A-r.4-;•••Yr`-;;;•••:,..-'-•-•-/-; I.77 - "." .....A • .............. • if.v: • .' . 7..* ''.- --Virai.:,-......:C.'-/-,•-•-i..- i•, .ZI. .7•C• . _ A. ?.: 7-• t,rairt.........••• •=7. f. ;' r •' •. .,/. ' 1. ;••• - 7.•-••.----4".... , ..,,, .-77.-7--_• .--- .:. ,: ' . •••:-- • .--I.:7",• 7/ 0.7--I- •' •. 'If •..1.......-....:-.;,,...' i ..- '..'..:•••'..1.$ :-,51,,;,. .1.--•-7-, .... 7 ; -, , • .,'. 1 . ..• • 1,,n, % ... .. .__ __.e......,k1.44-1.•_,- ' - , : ,. •....... , , -• •--.1.V. '...i... .e,.. .. , ,.;. t..to ..-,'.. _ , - . • , ,,...::, -•';, .-,-' ' , i 4...i.- --,, -,i .........; _..44::; 4:_-....-1.4:,.;.4.,.4.::_4_4. • . - t, ..,„:".:7‘...:„..;,...„::::::::11..„. . • . i ,.. .,. . . - ..,,--,,-',7-..-"...--...-4- : !:11., 1 '.. i•. 1-_____ .._,_ •;-...-7 L 7 .. • !, 2,..T.... ••••_., . . i !..-.•.7" • : ••,4-, , 7; , ' , I , •V V • • r 4 r-_•.; ••,...- '''• •. r -. -7. '',... 7...' 7-2 _• : . .....___....1-A___:__•74-1._7. ``4•-!` '• I -",,"M '`-- ...- , -... ..., , , -...:00..........0_.±... . • i1 • - - • . - , ' ..,.:...1 i tt...., ... ,..-.:a .,••1 ,..i.., .- 2 - . . . 1 •,-.. ....,3....•A.... • •,,telr.-br.-:tto.,,..r..,4=-,...:Li-E... AA '..r. -.4:-...- -riC.-- . .7.. A ' - I , •I •-- •'.....„ * • 7"•- 7 "• "•`• .1..7'•'`r I v.::.:04.......... 'i ... _._.4.: . ..i... ,.,-..-; 1,..--•-1-. •-•;;; , t , -.1.1.:-7:--, ; ' i__.....,______ i -**:-.0-•••:.-..... 4 v...-._1 ., _ _ ; _ _ :.rr, i , ,-• i-. • ”- , • . '. ', . , - .. i•1 ...7.: 4.:,:,Ai. •. .t-A:...:': 1 I ''' • - -.T1 "i'''-r7.- -,- - r I . .. . ,..„,,,,,,..A.•A,... ; ,.,... "I• :.1 ., '1., ,„..,,, ., ' '•i-. . • . i 777ta;•77nas••••• a. .* 1.e• T ''.• :fr ..''-/ -.7#••---17:......a-...,..7 ....i._.„...:,f • i ,I,t. ' ' L.;____._ .', ...t........:.. ' , ...„...,....,„ :-...; ,-, i!,.....,,`-".I. ". • I.:•,...........-....--•.4-..4...---,.....- 2'1,•-•L•• . • ., . I woks...••WV O . ,-.... -..-...-.........-,........ 4.-- .- . i.............c ', 14 ' . . 1:!...,-.....2t.7-..?=............. 14,.•:,1 , ;.!;:....:z -.04;.... . ............... .; . .-I i :. 't 1 0.0.....:kr.-.. .. . . , ••7 • A ., ..;11--:"2:=.: -- . .i. • •-2, : .L... • • Park•r,o . . ...... ( --- ,..->. •'-r-r •; ...,--,0=1.;-,.. i • .1 . i....-.. • t ; ,..,:,.--. • • . I ' . . ' I 1.••• • , ___._.___ I: , -••••••;--„,.. =4.1,tr--,...ir" , ] . i 1 i ,1, i:! --- •• ,I i,.! . , . .. 77 r-,if-e 1 4 • , ,11, ., --- ,., . • • 1 ' eL. ! • i‘,41 i I. ...i -,,1 , ': ,: -. ,... ,i. - . •.• • . • •• .. r. 4.;111 -.7 • : , i • . 1•1 , • i ...„......-. .1. . ; . -- • kt_LL--- • .. • •i i ,. • ,. • ,... ,-, .i., •. ,.- ' • . ..., . .._-•-•_..._:... . 'I..... • ....t ZmLi•,_L--4•etg,i,r,,,,.-1".••••-j• r. - ' -1;+•••.•• '" 71..*'' - -4,‘-f-'.- :."`.--.71,-:' :,' :' kr----71- ...4,i-aele:r ,,; .....,,„„, 73.4 cr- ,.• .• . : .1 ,..1----t 1;f.: ! -_---_-_...-.}' . . i -'....-7..2'...^7- ,,I, .--,,---.'7«:7=77 :74.,-.."-' '• . . :•:;::::24 •7-.---:-..:. . • •- .. i ..-v-,•.-1-... • ! . • , , •••• . • -- ,,,,* • . .1,....--=._ . • Ai •, ,,,,-..moo..•••••• ..&44 .._.. -- , _„ _ ..... -. ....„ t,4.•,.: ,i.,:f PI•la --•__e•_.9.::..;..-..- -.....--------------_--.......--...... --,-:.• -----.........--- - --------- ..........0,1.....-..ts .{-(,-t‘t 1 i...,:t4• ••`Nt...,/•- • '71-'7.••••••• sC t`A..-7•••••••••• --- , (, 1777- •A";-iiii•-•______,Ww'-7-77.71/-7774:11.-777", 1CA../A- : Ii::---*.---'-.1-7r---1 --r1-7-7-7-------"7.--:,..:;,--- , '•-•.. ...v."... ..... • . •i 1.!i ."•--' IR ... 1 •- }:•...". I•-`7.# - • r'• 1 , . i:V1,1'11!1.ii. . •-•-• - . -......---4,.. .-......" - ...-1 _.-•.,_.• . r.._,..---:-.-••,-,•••44•r--:::1:-.-7..---••-- t. ---' - - -7' • ci11211131 I-.) ill:1111i t 1 11 t i a'Ill 1:P 6 0 (•-) (-7..) ; G...) 4i) 4) \ 1 . It • . • -- -- r 7----1 I, ---1 iik, H ii. ..,.., A . -. . 11) 4 • V 11: 11: ',' - — IT: 1'. !I — • HI 0 ;I : 't'' 1i '.1:1,-.:7-' if i 0 . . r •, I . • -----1-- 1;-,t0=-....1.7....7,4p .•:-.-f.• :-_•.1_ 0 [ , ....___- 11 ..• ii , ...... ... ..ii _,-- 1® -- ... , .----:, II 1 i --i _ ...... . I * I I I cA 1i2 I I) 1 JJ ® ......___ --- -lb 4 jj ® ..-___. , ,'-''--•. ...-...." iii s" "-- ' i k - - ' I -- li i4 (-9 RI • 49 - ; 2 tif .14 ----- .. .- r ' "- _ __. ", , .. I . _ ... 1 - I(PE II- 1 --- . i 1 ill '0 ...._. • 1 i moil i 11?,, 12`ii 11011;111111 piell1111111111111 Ilt.11', › : 11111 riiiii f IR- 1.1 ' ' 1 ill 114 11 1 I 111 1"' 1 (6) 1 ii :.!.:,t; iii!,.0 i 111-.1 1 , 1 M . I!Aat r I 11 � ii 0 oo Q 0!iT o ? o 0 0 o tt o 5 0 O p ® '. rt .� +( .r .t r w N' w • w .•--: « we « r vs-.:-.14-.t-ft—rls.. r:_Y-u.. 1ii j I ! N .......-_... .- v �J. _ 7- 1 i CI -1 i9 w--,..; --J .- + - .1 -! - I- - r ®- --'2------ ----:4 I fr: - - ,.....,......... 1 ! I ....-- . ........ r • 3 !, I �,M- I --; : i`! I ' ter. , ! 1 i i .�+�.': — ... 'T___._..T. -_ . ir i 1 I I T77 I I I t = �, J I ( ; 1 • 1 I i i I "ter ./ ,II I , I `Vao f S�Ma AI Maker M .5idat I 1 A. Plotting.4- z ! I. CIO 0..01F1•••• -;- IIIT; !, ` ! . I 1 ; S forme..so cf. „ [ MI I I I f II I :'I I 1 1 I I • ,..-;_ t nff�ost.A .J Tint RM PIMA T� • A 304. ...x.'11 I. l I .- 1 Y b 1 Y j -_-__- --_�__!!cam —4------- ,_._._._... c Ij_IIII -iII ® , t I Tr— j ;.I 1 ! i I. T- , I, ...4 it -lit 1 .11 A ..111 it_ 1 t- 1 i_-_._.-._ , 111 1 6 -- - 1 Y 1 • 1 L- Ti r ' 1 la ,r.... V .. air r_nut r... i .___.._ I I ; 1 a P R Y I . 1111111111_?". _.: iv : • O 3D ;,-1-V.t _, Y .1'-11.../411111 ... ,z . 7 Iniac 11-.z tz ` �, illl li 1i i' � ,��.r4.. _... :__ L. ;`.. I ---------r--: �`_ :_� \ Ill .41., -1 - i 1 1 ® 40 0 el ill 1ill ,�Iijl i31 "n Y1 1 is 1 11 11ill ,�; 1�; • :...JLIE Y • - • T— mnoj - M I ..._-- r Y - r I . ;-_ ii;� i - _.® i 1 �"` ! j ; 1 \\ 1 1 j I I 1 ' ). I j ! i i • I''I";I'' ! 1 1 !. 1 1'''•'..'. ' tON.R!SIM PAC yu.waou, "1 I • e, • gawk'soYswr I; i I -I,e. 3C ie ••• f, # �,i I +I ! I I { i I I II • ,e ' sI ';1 I ' { , I I i ..L., I ; I t �.r.SL: +j t I : I I t't� • 1 I � 1 1 1 F �� ,, I I — Ma c i i a ---4,44- ° -' -'- -- -_-. ._ r --- — 1 i • -+II - •• w I w .• •• w w f w .s .. -se--4 fr .. w - w • ' I @ ® © ®, I 0 o ® ® ti) 1 o ® 0 ,o 0 00 0 - -- _ _ i- — i -,---.2...._....:!--'....._ ,L pus;aptly ..__-- — ....,. r: INV ••••••• ••••• 1 CJ.A li(i I. #1 i ii I I 1 . i 1 — . .ra+ 1 -- 1---- _ r..,CCR SLMEDQLE I ! ▪ rl. ..4.6 I 7.c.fi I rma* ..a.11.4 I 214%4AS i I u.1 • !i . ! '::.•..7„..r. 1.1 II ilii ... I I x AA 1IE r , ......,. ,..a...• I --.-, .":7 ":-.::•. :.......". ;V.:L:1: :I--:71:-- 1:=___71.:, I ,a • , • i , , , LL. "I'_,.';-:'s....1=1 4.4..f.[... .r.•: :1 _.:= _:_...-. _...::_- 1___, __ i • I 1 1 i'• :4-•••-'•';','._.. • .• •nini . . .___,,.. -_.1 1: '..- ',.:r.,.- • •`-0••,, ' . — • ' . .-- -; li.4, ,cur vt;c ...7To .i_._ ::: •..-4.;. • 4.4 _._ .___..__ L6-7-7-...-':-•-44%,*='....: ; ,Ev:__--__-- = . • __ _. .. __.. -- - ,11--_,_---7.-7. ..„__-::: ,_,,:;: __-:: 1 1 ..,:I ".....;-4-- i.:'•4.#11e:...::44, :, _ 'F-Ir--- •1 .1 ,.'. ,-,.-.. ..r.,7.,•-i 7,,:1 - -- --• -==---.4....ror [ I --512.--47,-.- .•! , '.4::441.;...... 1.., ref.-:••. ,._ ,_ .,......._ 7.i.,, 4-......::: .•:-`1,1:-, ,.-.' ---: -7 .-•-•-• "--- . L. .;••• ,.. :--- u="z 1.;••••••••`` -'2-jt.11 ....FS: -4 .-T.r.:-. --.- = 712•••%=...".. , rt i_. ....... .'‘.• ----- ,-.- -...,..:t , --::::t mt. • 12---1,,..,;., ---- ,. 11,-,--i,„,: - ,,rry.,:t..E.F.1,• -r gal'r. L42.:1..tiMiT• -4= - 27....r...... f...- :7....,1,,-. ....• r4. .:- r r i:-.‘,-; . ,.. .6 t- ....... _ .4i•-•:....•-• 4j •'......+.41!44....... t.- _ .......,,........._ . .- ....... . -.. .7...,.. Z.Z.: '" ., : 'Z'41474.1 r„,,,,_ s' .71..---- I-J.'''. '' '',_ ...., 4 1• :• ' —.- ....1...1.4...... : 1._i_ .1:,,r,'..4',..i....Tx .f,,,•L.i r .-- -7-1- V:....: '.7---- F--- _-:---1J----- . ,-.4.11.1.gr,-T` " .. : •, — :4,---=-7-4.... . lit-Fif .r•...:::': •. . . 1,------_•___77..:.__.--- ......... . . a— - - ret-....„...1'._..rk_ , ,,,,,---o, •Ak• _ .______... 4.•,,•.-.11"....___ - - .1,-r .E._ -•• ..... ...,._.___,• ..t.._71,40.., - .-- - — 1I ,,..i....4.4...17.F ,.."1!.. ......_.. _.__-__ .L...., . -- _ . - -• -. -- ., :,.,!t,..•.....11.,..F24-::_.- ,7.•t:1:r-----__:--____.--____= --- , - •• .- __. . . .....,_ 1 1 .......:-., _P. '1 r--1-'...; -:-.'."" .414.'1 - • • ..... i . -I ,z-..r.N.... ; nr-- -., ;•., 11--- J .....1. ..........Z7 . ! .-. Crlf:.•• • T -- " 'i .I, .Ly_ .i t .L.,e.•:.• ' : -1,-,--,...0, .. • —.. -' •-•-• ---- ' ' I; - rv.-;',1:7.:-. 1 . I i " ..+.7.2,....4...... it-t--;-.7-1 I,,..,•.4.:/....e_. .: :4-1.21_,...,-4.--.1---_-7-•-;47_=. ":- "."--Amrse-7-ri.:.• ' ; " rr. t. II • -It- - -- IT -- siggi:"d 1 -1 i a-71.- '- : ' _f__ f"3-F"-- 1 - Q . ---. - c =:r." -81 , i ';____77.".._.. . =7:72: -.-•••••-•.---- . • - haw zrin ;-, ( ....t-. ' ''.L''Z.;:ILL Hr.-.t—_ ,I :, . . • t .1 -=.71.... ....._____. ..,-;:,.., ,.,,, . -- X ' --Z V., i . • --' =LT - IL aft,a•Cama . , 2•:.1. ....._ ,.. .. , • . I — —.:E-1-- -- —— ' . . .•_....... , 4.,•_ __._ .• Dot trl. - 4 _ a P-t .4.4171M- - ._ 77 -- - -- '."-' ._.. -- . ..... -7-1- -.--,-,--- . %, :'•, .1-__- _ '-••••• I, .... .1 I rel.- 1 i. : . , L . . ......... . ' ........ ,......... ,, • 1 su... ,____ _ .,. - •-"' i W .......,_, .1..,_1. •_1--zr.... . =....... .::- 1t:c.ILI . al: -7 "'" .....MCA OETAILS -...-.- I..1r.:.- ....... • i r..r..:-• 1 r— t ........../m corm 1 I = ..--.. t.1 • • • A i 701 I; •— • :-, I 1 I i .:•-. -I'lr•.,..-..:a: :a_-1=7, ,_a_...--a_.: ;.• ._,. .- 4.0 '-'1 I I3-'i zi.---1. .timi.....asorair 7.i..:...-fer_•_— . . _ :31.1I -a- _..,...,, i ... ,..... ,. ...-' -;- ' _ =--- \.. .... - — — ...-------... .._.,_.-:.......... :•... ./ li\5,—.75.'7 • ,-..-• .1". II — qr-...7‘-.. .-- 1' ____ -- ..-:- I ,.. . : • -- :/ •-•-• . f:„ (4-- - -,''..- "... !.' -t _ . ........- ..m ... -----..a ................... s 'at.2.7**..4.....• , : *. .,.... -4+' •, riga••••..... .- 'II' - - r.':4:'7:-. ......." , • ..-LI-..“.,4- 4....k =••••".?........ ..,—,..jr‘ , •.• l, -4 .......... • *.-r, .-..1.-+•.-..Aoras.e. •'....."11:.L. . ...., I - - --..,-...... , IT t ar , .- •-, Shows and s. I I—,-i --.=.1.7 ••__N:_...„*., Psalm% ,„„., _....: . _ , ......--....-........ ---.i I--1---- ,-1 ....., . I'1 ilel '.. I ; ; 111... 11 I • • ri ...ill 1-: A:. 70. ratn:7••• ::: 1 ;,. zv. iiit_l ___ _ ... -- Eill .f. STINIMIONT NMI 1 _ c.w.o.ommaas " .... ..., Mill..1 r...r... . i , ..:. ; i_-,- .... .- .... ..: 4..1 4_,/ \__,,_:-4i, .....,..... raw ' 1,111E-,i Lt. i .wri... .. --- ...........— -:- - =•--':-4.7—. A 18139 4. __ ,,,,,,fr_.,___y,4_,...— ,--- _________ - , vrotat • • . ., • -7----- h 1 ii, ii; li li,:1;., 111 1131 11,11 i I . 1 to ' 11 . 1 hoopil 16 4144 1.. 41 .'lire Pi !ill 11111111 fill II ,i!; :1 1 hili 1E11111h 111111100 11111 1110111 1 ii im idiai E III Ili i ___________ ________. _TI__ __Th 4 t 45 1 ti f :it 1 Ili .4 41 ... 4. til 1 - ! 1. _ I i t t ti ,i: II.-.0.1.,.;/..1 . it 11114ttiT tR±{AttAitd• k 1-1:51 1 I . ,I,.: , ,, 1 . ____. ll ,,,_ . 1 4uir- - . . 1 iii li 1:- 1 . 1 , 1-- -f I; . - II . , r----1 .7.-ii I qt, . 1' r . , . : . , I, --t lilt' - gii: 1 si . .. . .... ._. ._ —iv a ati a( r - • - - 1 1......4" PI ;...i • 1 ,ii 1 1 !iuls 'T. II' =I r• 11111 1 '4Iiirli ( ; 1 - -- II 3 II 4 , li 7:4 ....,.. j 1 f:gff 1 •••4-11 .44i- JFLIi ''— it ,44 ill ii , • H41 i au! , 1 - _ 1 ..-. • fi'-' tr:11--FT) . , , , _, i „11 , j- :±4: , MI (1' !'•i .. 1 1 , , i .. . , . .r, ..,1 -- I , 1 - 1.1.17•11Fa i , 0:N..; , • 1 1,.. f i 1 . H; ,r, a 4 V.. 1,•,, 4 4', I I 1,Is,._,ii 41 • " I 4:„,-,,,n,.. I i. ., 1 i 4 • .. ! f t 0-1- ! ! : 14_ . '.1•1 il..,_ R • .1 , ; 0 I i, -..,•••• ..•, ..„„. •Ni r. 'I.v.r' . . i . ! 1.,-0 .. ..,,,, .,... ....... , 1 ; 1 I I , 1.;,. ! i J. .11 I ,ts3,i e h i il i II r-t i i I. ie -'s ,t 111 -'14 - , I. --------- . • ' . . ..•. i • .1 T . • 1 V.`"'-- i---'-• ..;. ...._. .40- . . ,. !rei•Htf::,...':.1•:•:•:, I i . — 51 - , MN 1 1 i I ! Lilni .‘ ... 'i' • 1 I II s._. I t i k I . -•' * , 9 ....... I I I ... ... ... ..!... ... I 1 a,j 6..1,.., , f- "........—*-•• .Il '........." '''''. .0. ; .weo...o. • . = low.a.m....11....o. • . 1 .......•.-ar.•---T1---.1 --- ,............. ( II . I•••._:.-...zr.-.•—. I ' . I 116.. ilgill'mann laial.,,4agg...1 iii._,,ra.,,agnannals•no,,cfriI .......—... , . i i : :—:--•-• • , .2_-_--:.-•=..— I , ,__,------- i ! Anchor Plass I I I i Shona aad 1 I ! I Parting , . ........-..---....... I I . I' .4 4 vl.n..adt • i I ••••• I 1 . I ? I I , I IMr.if.'1*".E.7.1. i W.t.W....i::... . I.' 1 . . .. . , . . .! . . 1 SMINIFFICIIT ORN.3 • . I CsonoloVisaw. : . I .----- .... A 801AI . . .- • • I DRAWING I N DEX • ARCHITECTURAL STRUCT URAL I MECHANICAL i „ V .I Lx.r•OY NAP I Tea 1 TEST SOPPING FLY _Lo. I SISSY .E'VO. FLOOR PLAN . 1 a.3 i I0NTxe flrt K.N-_-�___.__ :s.j.r LEM.FL.w 101.0CAL! ;•I. SECOND•TRIFID LEVEL FLOOn .l[w� 0 q f *0 I NEN SITE PLAN _— __—.--I t2 r Mrlon•FIRST Fl.P.rw.KUN :ART I i f-1 I FOURTHLEVEL •fool K._5_ _ 2 3 I SS FONIMTPON A FIRST IL.PRAY.KY R•E I l!ROOF LLVEL FLOOR PLAN ♦ 1 LITE DETAILS _.._. —_——.—_� ASISO LIVEL FLOOR FLY I14 ._0.120•FIRST•L IRYING FLY NT 1 r4 ,of-AILI ! _ U. I IFF LEVEL FLOOR FLAN .SS I FO.YOATM!FIRST FL PRAM.FLY PANTS' .— - A.7 F/ 1 Lu•-.[VEL FLOOR ALAN --t SECOND FLM[IR.YINO l± FAIT I-- I y J N I 310110041 LEVEL FLOOR P Y s1 motto FLOOR'I..4Y ..•1 I N li AS T IR-.NCR M/2N FLOUR FLYS _ I SN J DEC00 FLOUR Pomona *Lax FUNTT 1 I {■ s10 i SE./NI CORNER FLOOR PLANS __— _ SG I MON PLOOR IRMYNG N .Y=S_ , I f H! i▪ MAIN N/!AF FLOOR KART Sq NIO FLOOR FRAM.FLAN .YT I 1 ��[[ NO ELEVATION I � I NVI 1 TYY KOOR FRYING KY MAT I� I � 1 a.l SOUTH ELEVATION VI `rlwD FLOOR FN.ea KY PART at jELECTRICAL I iN TE1fr tltwrlOY VII 1 11110 PLO.FRAN. FLY MATS __ _M 1I MST [l['NTION NN 1 FDNITN FLOM FRAMING FLAN PYT I .sl .FIRST LEVEL FLOOR K.N _ I -*CAW:" M I[LIVATIM_lECTM-TYPICAL OITAILI Ile I FOURTH PLM*P.M.KY PYT S i E2 180400 LEVEL FLOOR KY—.—. 1 KCTIMf --- — M 1400*1N ,LOM FR,WNG KAY PART*4 81 T THIRD LEVEL FLOOR PLAN • """���lll '� � AT i .4 I PRINTN LEVEL F100*PLAN _ N I K4TMI — 7 TIN I ROOFTN F l L. P PLAN n [r —, WM 1 a 1.;. .7.1=1-711 STAIR NT FLOOR—PT-LAN ILII fN ROOF • WN[ K,» PANT 0 +ES 100: L[VE�:1001 P. (j a .10TR STAIR LY FLOOR ALAN II. ..0F F... PLAN *ART I 1!G •RAY.SECTION __ __ i A0I .•STY. 0rF/♦ P100 840, FRAYIM PLAY PYT 1_ 1 s1 LiN1 OIY*AY • !WIC N1l.R ROOY� i > J.lI SR MIR M FLOC. ALAN---- .821 100E P.O. PLY PMTS I Se 1/0[`10! 1CN[WLl W11 SE.fru! 10 FLOUR PLY Ifa'man ROOP PLANS• O[TAILI I M PARKINS SI.N DETAIIf • !CHM. n o .[A 1 NI. ITYI M FLOOR KY 400,200 'imam•DETAIL, P U � _ . Aa TYPICAL STAIR ELEVATION �fE♦ ff CTlOxf _ I ♦ > , • SIG I TYPICAL STAIR SECTION _. _ �fi 1441200! —' —� -al _ ` S O 0 : STY* DETAILS sa I SEtn0fS I few _ _ - ._ : i I • _ We I RAILIOS MTULS MM DETAILS _ fv I RTA.A xenors _ __3 ill.u.0i0PSl .t...ONlq_�-TWO.LLYII!wane .. was r METAL FASCIA DETAILS 1fa i snot f[cr1015 — —3 I I I .W.e6 I t ♦ sat 'Y[nL wrp.NUN sem 104;Semmes —�f I , ♦ s/' .F).5.j..‘../.2F.w. < s)l CONTROL 1100Th fM DETAILS —_ ` _� • I it H 0 73=71•177.011T/GRAMCI --- 10 011Tulf - fr j 1 ( ��W1100 IL a —_ '.f.•i.NOTE. a !LAO SCHEDULE LINCOLN •SLI. IO0F1 I IIHORSI #x0P11 [ V 0it. I '814 11l C0.WK ICIIt OUL[ _ I • LINCOLN 'ROAD 0411 Q I ,.f1Ll slr COLUMN fCN[0ML[—— c' F Isl♦II KAN SCx EOULE I 11 I I I I Q W V 1 ff.Af.L• sur ICN[0YL! 1 i I LINCO}N NALL I oFI VNyf "NW" u z NA I WWI fT TENSION SI:N PROFILES I r00/7 I I 4._ j ,Fin-w.N a.t.AI-LTD�nLI — _1 : I i I i 1 VI Z—" LOCATION MAS I O*O S Y M B O L S AND LEGEND u 1 Q V 0 6 l. r—eowrN IRIS.11001.11 LETTEROR •o YT © — .o[lL[v. ows =—C0SCSOr[ y fie//_—araC wr•[1 n�EL[YA noxi ®^-�ALUY —•i�N 1 SN[ET WHINE DETAIL II ORAVA �� .40210 L "� `f�IECTION AM. ={ --KTR000 AP-1 • j,,..).✓✓)r NIRO SECTION IG MARN r_- wE"S�IM IM IS 104.120 3 .-8000—M0. TY.[ i..:...:..._ Ars 11Fi 1i.,I �sRF ~ .I Fn 1 !404014 MUMS. 11}112 I • . -........;--.._. ._. SEVENTEENTH STREET, • • 1 .•-• MEC-- I. -r--- xt.l., lt-ii. . 2.1..a. . rff... I g • '1 ad, 1... 41-1-1 ii..• . 40•te• .EGY.al S•i 339 . r 0,100111r•LOW I t 1 1 , ____JE___,-541 __-__.a _ ___JAL_ ___ix.____.-1:31711=2 ._-.Li--:1-.-.171.1-....._L. , ..-l--.12 ra , .' I ...AVOSCA1•1031 I 4 i„..4 MITES 1311 Mr p it, . .l.•si.,.nate am smog , GAL-SI VENOM VI I I IIII , 0•• say ar• 04;1.GIST SPN001 - ° OTI•ESI.011-0 9.1- -CUPS/OUrMS .,. .4-...-•••4 'r• i-L-------, .!:IF:"±7-1-14:1rum.0 ad I•J•Gt2 ' ; i .: STI3.,cr'n • • I . G 0.000[Ad•Li.101113.1./TROId IZI' 3 I 1 -,.. . ! N 1 mmg YL•-•--k•REvela Irks.SoISTMS : f, ' 1 3331 V*ROO./031Nomill .... .. .t."°...1."."4:20.'''.'" as , OW 01.13.0•0•TGY .. I' 11 .,.• 3 : • 1 ,I I .TU4.VMS Ala I , ' GNPS MISS . 7....•'''.. f•••-7 I' - 4 I. PCIP RIG; Ikt g I.! ,,,,,, IMI P I . ilb • I •II 1 1• • mm•••=t, ,, I , J I , ,.- i • i PLR IMMO AMAMI 1 3-sATSOIlwara I . e., 2 A Ild../3c0K0,30•40TG --1-71-•ROS fI3 St Veal C011•KiCS, I-, J.- Il 1 g us,.en.3.4113ade -- romE,Ile val.MIS .. 1•1- L . ......1 -.-... as,L9C01133 0 I: 1 A - -1 I diEvE0m0.01.030 I . . mir 3X 1----#1 ... .. .../.• ,. --„ E .I•1 ._ GIST WS 3 1 MU * it = I INC 1,11 . 4,m2 '' 3-J.• E '," t 6,-.G.;INCE ISCVal I ' I , L J L- -1 I r t=i----." Ginn 33.3 13GrE sa.r1 I 7 ENI•Ita..C3 WI IT Of ' -( IA. t • •••r I 1 r T a: . . N x0040 Sarefe•M 301 PEI. Ing. 411110----. , . z . _ I AT I.•0 KS.31•MOI I . , i ,,,„„.WV.0.1 . . ST ORSOCS •1741.2.-.,, , 1 4 I mu ARDCATIES ...., 1 1?I 1 vIONT tiXtldes 0311 GM,11•0143 3X A I 3Zil '3:10 am 3137 '2...' *31Z I mucniii-co Am. . • I I i.. I , I t • I 1-4 I SIVAS d0l3Z1 k,i: ' r39 is1 1' 339 t i A., . .. . .. Illi MA sii 1 .!•1 . , ; • IAJ I, 4( ra.: i . i 1 1 I a • ' 0 , sig 1- ',129 aza i as_., ,....333....._., •41c.,,,,,,,„4,4' lam • 331 el as L.•• ..,. ," L 0 Z 11 on 1 -..,,.. • . 111-1--, r.---------.1 I t--1- El! , 4•- , --1 1 .'''' . I , , - • . 1.3-I-. ) ... •. ......../, mai -. • „....._._ ..,„ . , : , . . .., , •• , — lk i. • - ii z .1,24 -z -- - _ __,--------__,,,_ . . ..,t......,_-____.,./ ortli. 3403 XI I 'I 7112 i IA 1 331 I 1 3311 __7 . 1 .4--aracros r -ma I . .• ,- • . 1 - or.not aro 7..74c7..d.7 ..... ';Ics, I I , LAMM..Id RISCO. 0 9 I Or 4010-.4.1.33 ow I , PLACIA1.0.60.%&gm 1 ,nn III 3004 sIE....G.wag=I•TATIOry IT jai._ t._52 4-0.JP MaJad T3223_,01313,11-- • 11 * me.:Derr••••10IIS .....• ..... • wi• STRINTYPS%.. t TO A SdisTIM ....... ........ 4•••,...g a`N/T•K..p., _•_r_._ 4 G. .. .I. •''" •—.- - 1: • •--•-• • 11 — ...".... 1 aaldlICI•LAWS-I — A-2 ......41...zz227„-2:z4.,,,„„,,_ • 1 -71 333 331 K2 3711 — .. 32 .. TYPICAL SECTION COMFACTICN PATTERN 3991 S Ft LINCOLN LANE (0131,13V4SITT ASKS d)IFEC•raladd •• D(I STING SITE PLAN_____1".20 1—.7.,.,..=- 7314 • • e • —PAYeNANT Iv i_. . '\ MIL•6,401 1 f .�., - _ .I i •© r +I i, 1 �T >liilsss[Er�9'+r!� �— 4 w 1152 1_1_7-- f ' f.� o..... a . • -, _I1 °50 - A , 2 To— 'COLN 61Tr amoaa ITwc: 1 —Du.p1 PAv6NaT •,_M---- I .. `—i[1,0 FOR P4v6wnT XiNL5 lnu 3.•063 NOMAA _ t 1 -C- 3•111106 PROP.. 461,5.TO D.NO.AO I I 2%OR !TORN 3.A,•OF3r3TIN &NO:ITCH S _ S•30.3 .es!. TO DRAWING NO 5.1 L00 Q {`� • �-...TRACTION RANT D•a C ! f Lam_ > I - -____ J = �—I/3•[iN.fION IOW Le^ vo 6_ y N CYw 411p 3prT1. : I .N. .-' xswn rLr[w.r ■r ; ...7. +1 .V i .. 3 f _ _reor[.rr uw _ '.. N I :s Pe01l01 LIWi! • .e e NN•G al-AWNS —..,.....T, H . MI WN0 3D I/4.UP JOINT 1 , las VP r0 TYPICAL PAVEMENT DETAIL ' Mame • .• `' I I AM– — 1111 I ij ima j • c u —.•AAAA. 6N :DPv1ANZ / --7 n 44,, eo ` '.J V� „ . , __I__ . ,,,, , 0 , i ..... .... -10..0 ---1--,-i) — ........m... APIA\ r I ' ' I !' f e �. , ......„Z MIT ....... ..... e t �N A-3 I Np TN LINCOLN LONA 1 u uACO A Nall. 3Non NEW SITE PLA K I!l e,20l AA �.cr•'Fir" .w. a.-Y. LLNI[TIM 110[0 ,114' r-4. ya•� [� -I..-73-1—0944GMT' PLAN.", 1 � 10" r11accT LIMIT ! •-lo• -a• —GONG. —au[ tan . • ' ... rnouf . 16 Af IMALTIC •tttr[N1L. . Y •. • ���ION'IOO CATION !OOTINOf • ,NO 11Aft 11.10" LIMA. 11[![11 r0 IITRUGTYNAI ERM,. DUSTING 110A0 Itl�•0' _._--5'. n v[.•4 e• ^ 1 * • 7I `ROJECT Llrli —1CO.CONC I,NT[N n f [LEKTON II0.1•I A.C ? ;) = '� [ n f10[wlA O ' r L-- ' JOINT PILL[N- ••---[1.[YTa MT Ylt a i I PILL �.•FILL I-- I! --£0MALTIC I C. • O LL . 0 flat NIC. r• .. " 3a'-o' ro' � r-3- r11arE11rr uNf,� w flo[wu p r-, --"___ ..NAL nc •ivc Nar CONTRACTION JOINT I1 ..—ROJECT WIN { E DETAIL nur ruts vza ft:.•MADE CONc� RANT[11 r ,—..... 'of [0 I I :-----7:::, a 1 I P11.1.aAO{ .. 1 i ,IYI!I1L[N 130 F • a o,. Y y z T i < ..0tL� INN- If • —FILL `CONC.cuss (SPOOL TIC •.V[rENr < PROP..LIN[ I T' • t0 r^KM fA3t ... .,,,I: • L_f M0.1tcT LININ 11 yy I J _ /� I i ii ii :01'0 i• llLeCil�]!/X4 4P" ."COxG.e y+i ? 9ysir,oj•Imo... Ta3_4^+ido 70". `/,�' alo[wu , r,2 'I . i s r O• Q l ' f'''S ---------.JL. ,r 1t,I ^,3rx,Lnc rrvExENr a� v.i t CON.GY11t l—IAS[ CouPS[ _ II N O I�MOJ[GT LIrIT 1-+Q C011C -_ T' EONt. !� I i - I 1 W O : • 0013 Emir.CA11,0� I A'Amor null--; V �+ I - I •• `—Tl_ EXPANSION JOINT r4IC I• —� :7_. �; .1_,9,,,a; -3,-,,,I.a•;Iw.¢' DETAIL NAIr mu. out S• < f'-N• -0' aMAITtO ....NTV I '�'!^J[IMT PI,. I—lMf[ 0"0311]11 Z 4 t L l.atcT LIMIT i 7-5!!lcad.—, r.; GONG—.-1 I I : _z=<_ i I I ! J I o L—J • -, I1L (.ILL a z- . 3 1----11.5 [Ea[ V ASMALTIG IAKI1t11T ..Ia_- r Ya[C.Nft •^�+ISA:% ' I[O.3 rT LLIIIT � COMC i[L[ 11[303—� II 1 >II[ [.Eft ^—' , • x - a T I` I I .i3r CArCN fA,N I- A-4. I �......-- nL�--• ln T.d.43kfieigdak• PO:o.• —4 I—I • = + 32 SITE DETAILS 3/4Nr II-0r I""j�'-1—•r 05.4"' .4" T1 - 1111111111 r i. ® _c.?,_. _k: _.-1._g.itit.•41.1.1 mr li,___14 c . - * J1 q- N•yI °h _ �h� 1 x 1 __J_L. • + . 1U 11111 _11L 1 1-1i1 q Ij1 1I t_ k._ , ,./. � ► - ---1 ---F-H j I j . I j 1 I -r1 . - _ i i It }ro F–' 11.--1T-- 11111 :1111. II 11111 1 � -� Xe.---- 1111-1-111—� j1I. f= _ <1 j I _� ••. e • 1 ILI _ - - . - If•�y I� 11i ITI1FFlII1111I110 �: _� :: - �•_ —I _ III F l , llliil _ r-- :_ : 1 1 . i � I 1 1 I _�•_ - 1 P l.` 1 _.L-;, ' D '''.. , r I 1 /. 1111 I I I ! 1—. 1:mr4.0�� - :4: . lliii 1I .1 �rI l _ !T1i 1 _- _� _- - - —. .N4'� lEtF- 1 1 Aa 1 I 1 444 — ' .r Datle _- —•I . . _JLfif I l i T-- IIILLL - II II 4-r I '-r rI:r eirt-r st • ' - i ti.a"1 II rk ",61 1 11 11 0;K ; Ni Ij qI. ilii _ 1\ {I q e� i If , fa4 R �� `olif- + gEl §.04 11 , t..... c ' {ila{\NTII\AY,INC. • �: D? I PARKING GARAGE .:.. ••. ..._ .....-.- 1 LINCOLN LANE • WEST (..11.:i1 JI;is CITY OF MIAMI/EACH, FLORIDA .••.••.••.••..•..• a•r, . ....... • •-•• 1 CONT\ACT N• FA-{{ • I ant' J !Fir � rrr+�(� ) • ! it I I ,A,,F© - 1–1- r'•w I-4 __ _ ._yl_ _ uv nl .Q �4 W�{t �1' .1ei---� 1 _.1 i a ® I-1 /i ' /t . 4 i 1' 1 -AI . —:ill P11 I' _ a . CI X..I .�.l i 11 [ r1 '; 1 i-- I` H[ i JJ[ . 1--, _ n_ 1....i._ 1_ i_,1 k }+ f - i 11 .I. 'I,_ til 1 11. . _AA,"_- I_I—sa we a _ _LI_ ' 1,1)*— i:IL .I 1 7- v- . 7:- Iii riiii m i, ii . 1. 1. +#H� .4 , != ! _[..1.�_ 1 1- I _1_ 4 J-k 1 II 11:4 i Lit\II_Iiiki I tt-ill I :1, _— 111 TT1-11 I ili tial p 1 n ' 1-1 I t 1 it 1 °a- Ii i) f I _.1.- _ 1_ ...... li.L..4.__H_ _ r1=1_-, F Jilt -- _r. . DV I. _1z_.�__ LUI III III 11h I ,I g 1....1.. x -1- h1 :.::1, 1....1....1 1. 1 - r o E I ' I - _ I it 11011111 1-tiil _111 I_III_I 1a1 o0 iis-ii I�_ -Iill _i _1- 11 i t�l I l i .l_ I -11� I �r 1 -�',Ll _ �- i `. .. a . iiLi1Li1LjiIti r1�tI1 sr •al.,-- -, FIIz S Tli-.1 .r .• Y Y - f as 1 j• 6. co-alI' ''.0t 17:4,1 w a_ of-a' K-r w.r al i 4 Yr .a.a: '.-a' " I.-J• lir - Yl'al a'.3 `...-d3' 12I 47. Y_i'.er Y'Ja:'2'.a.A:4r. e - F:E Ih"k:IilIin e. b f 11531 f. f i' ;,a a I r - PARKING GARAGE ISIS{I.Ny11..Y.INC .I •,•, et N D' LINCOLN LANE • WEST ......:... ....,......,.w. i 0);11 FI. CITY OF MIAMI BEACH, OLLIDA ..... ,_.. i 'l a CONI.ACI N..PA•.{ ................•.., y .. — ea0- .— . - _ V1L ' c I ,-,--,--..-- - _ _N _ , ht1 k. —oilII • r i . r, -.L.- _ L _.Il'!a_ 1.1+rr_ - l, -- j 1 1 ..lefr__ 1iJ4tWMU-1! till _ .-,GP_ • .,..,_ 4. . • 3firmflT?flTh I 111111. jI A i 111 1 I 1 1 1.A.H =HI , I1Ifl iii IF-I ... - ,� - - miniim, - — UL—A_-.l-I! _1 .II 1 j_ ,. III I II [11 1 Hr o . 1. . 1..1 fi I I 111) 4 . Ella _I Ikali: I I I- III LI U III_ I 1111_01 I I ..... Z. k1r i je___. , i . .. 1 1 � i i I I I I ' r i 1_, ,., /NMI. 11=11111i lli/ is.r Io-s .es r Ail. Is s Ir-r Ya t r:r rt-.s H l;-r Los N l li ar 114 1,1.2 N'A K a:9' _1.1_1. I t,) '_^ ..©— 0 1 ® ID 2^ m 0 1. U O • a s) • (� O a 0 i 11 l zji _ I I PARKING GARAGEN ITRA..INC D ; LINCOLN LANE WEST .............,..,.......`"... _,.... .......... - —4:i` 1 CITY OF MIAMI/EACH•FLORIDA „‘0,,,,‘0,,,,„„...cc .. .•.w•r.c.s ...c o II . ' CONTRACT N..PA-Si ....... . ..... ............. .... . % or a 1 ! - i t_� 0- 1 ` Ia EMIl ! I111 Iii_74 ; � - "' i i 1 I l ' � a + i_ 4 i ; .. f 1.1 -ii_I II I �_1_LUiJ 4111111 L11 +--i ' f 1111 . 1 1 1 ill 1 11.14111.11 III R ; 1111 111_1i ' jii I -1_ 111- 1 _I ILif- — _. .___,.._ iii,_ , iia' 1�Y i�OfiammOmm { .— x'4- -1 ... _ _ _.._ - J<••j1 f 11TrE I II Js4 _H. 4_...1._i _ —1, g 1 I I I I I-I l ITf 1 _ i:iij -� ---F 11.U1I I I I I I U I _ I 1111 11.11 q 1 --i---t 1 H i . 1 1 I In 1 Tri-Triti ' H i I _Ii_HI=i --t J---i 14 . - 1---1,— [—I—J-1 lb •1 -• 4--1 —I 4. 7 11 , l' t-,--___ 11 I I I I . III M; _ __ 1.I 1 WI'WJJ - 1 1 1 Lrfrl I III 1 - 11 .1—_.Ifi1-1III..fit , Nil 4... I T yI tP i • iv -1 1 .. 1 E- I 1 T" 'I (1_ --1.- I _. 1,.,:t..1 _ I 1 fi fiJtirt I ' ALL 1-1— till 111—1 1 IU— .10 1 D - _ III1i- 1 I M,,; lifII17111II1111I1f.1 aioa• rirl 1 i ilk 441 _ 1 1_11 _ -, -- il..- 7 40 #11' . 1 II1II111IF _ i1itIIId1111111lIII , {Ii . ; irelisdP ` x " rt:A r i=Tli:ai .i• H t_YLA AA.A.11"I rTLAIof a'.A1-3" ti i'.tl-a_ .,L.LL1._i. a'..�A.la S lrl.s11H a-_Jti,- - C.�_@i /5 C) CU Q.9 C) CJ 41 U U asiO w: (;)— a I'•1 _) iv ;<,) I. ;s rip [/.n11wly� " � l a 11 i I PARKING GARAGE ulss"r,"!Ar.INc. I .. >, - LINCOLN LANE WEST .........'... ..._. --i N i t{'' ) CITY OF MIAMI REACH.FLORIDA , ( N. :F f CONTRACT NA,PA.1111 ................. ... ; . ""=" . - • 4—___.,-----.---._— 4 4; c O. 0 --,-. / ..„ _, [ ., „ 1 . / ID • -.-. ,y. i 1 . --/— . -----. ma -t, 1.14-- - • 0 12' L...2 _TX_ • . I "1/ . ( 1 t. CO 1.... 't A I I ' 4 / • / 0 .N\k. 1 (.4 - — / — • . .. . , - •—AB-— -—0 /., .I "• ivg '• / - / \ ' 1 XIE 0 -- „ • • . 'ift EFT 1.1.4 T,T CIL 11111 7 I* _._ _...._ . . i---;/:- II n Q +! I al H-a" _ Z T ,...) u, . ,... _., . _. . M P 1 g z I , , 4.I 0. j i ..._ SI 0 - —.._.• ® .1_1 .... ! 1 j- \•1 .. I 0 _: 4--r .1 .c. c / '''''.. I.„, • . '.- 4 ' 4 - .-' . - - - --.... at0 . . . . .. ._ ._. • VI t. Ailikiik '''' ' ,.' / •4,. ' ( •kihN I it • ,ii ."••:' •.e• !, . . • •F, 0 t s _ . IQ__ 4o• • . . 0 I! I . .rx•.t .., __ _DE.1111_' ___IERbf _LEX__ __all_ I t 1 I PARKING GARAGE MSS 6 NYIYTIA ,INC. 610•4•06,1.• 1.1"•11•”“),A1 S ,....: CO•111.11.,•••1•8 LINCOLN LANE • WEST -------- .,_• ,, . w: • 1 CITY Of MIAMI BEACH,FLORIDA .A.„0“.„,.„.w,„...m, ""'....".."''''''.L."'.• CONTIACI N..PA-46 ....am coo.*.......••.....Jwe w ..... ..“.,.. l —_ ..•:.,___..101.11. r-•••a.'."----- 1. • aii , I.—, -I' :' :nowt-I -r mac.anca DETAIL 9 1 - .8f-c. .-2,0.31. (7 4.4 '.'rsp.,41.MINCE.410111,4 of MUM SniuMal 9 °L .....,..„.„, • c) ..... Qc-)...., i 1 -- 2,37_7))„„, ____, -,- 1 :-0 i : ® r. i . !•J .r zui• I 21-...T.— ! I 1 ,I 4 I _ +La; ir-ale L. II,d - , 1 , : -1 I `•;I i •1 I I , -. : II ,.., 1 ... --.,—-----..—........---1 - - —• t I I S'-Cf 3. _Li 4 1 , M 12:•"*‘" : I . .r ,. ..c, ---- ---4.841-7 I-. 71 ' 'I . . ..-, • . "cgOlt. S•Cr'• 1 . .' ----..- '' '71-'' • 8 ,.. ' • ul.MAINE I 1 J '4. 1 i 4'-ol ..via2iNr 4 74.i.. ... . ,.), ui •-. a cr•Ler'-r- "-”r 1.•,; . , ' I" ; . ; 1...• , 1 ....:-1- °I' — ; : 4 , . --• i li; ......;fir—;;;;;;V,,;== . _; r.kr.4.,_,I 1—..--— ____(;) . a ! Wit, $1 ___1 .„,..-,..,,441rin i, , -.....111.; 4'. ix .;.-4..., I ; 1 ‘ -E)-:, ;I! n•1; ; i A ,bor•ora. 1I i ____4,.. E.CORNER 'SECOND LEVEL S.E CORNER PART PUN . ' 1 &E.CORNER THIRD LEVEL I MITI LEVEL.313/11-0,3111 P•3313.MATLEFII ;;.. f•i .g.,, __ 'FOURTH LEVEL ' a %."'",P,...410 ..;•i i ' ouraieun . .• • • -10 1 v • 1 ;., . _.._., (I) . 1': • 1 I _/-_-,..Z-Cr I '41 o -Ii— . :Cll. 1+4—.. 1 -I wa- _e in. .. ... - .., ..' -I or,.Cowls. -i---, . fl--u I 4 .--...: • at • i,i , 234 . . " . 4:( 11.1 V. . '771:: 0 Z 1 4 I , .)-- v.-- . ._____ t 1 'room. .. ‘2....1-LI I 113. I b. 1 : . .. =Mpli I • 1 '$ I : V.I Z 4 ,_,... mi----.7-- . Of le -A i g , y "11 ia=f sli it gm se*/Iv 1 ..':---•' UMW *. I 4 grprqat___ernL rj_n roe _jr_. ti . .—I. .•,. 1 0 i" 4 1 I SO R -?-- i, I I a - ROM 1 17 I 7.; ON,.K....,11..vi i LIM,.A3 31.1.11 ix 0 Au 4 4,-)- ...I u : 111111,4111ti l'i . t , ....... 2•1 •. il III .._ -_-/ ....... ....1..; — , l'a. .- •,•- •....--• ',..-- ' i I . •I r're - 1 i' . 1 . FIRST LEVEL SECCND I —mon tit.,41,,gyilr. A—I0 • N.E. CORNER .. 32 SE. CORNER FIRST LEVEL I « SE a NE CORNER PLANS 1/8"-r-07' l ---11:—. _ I 11 Pin mss!_ - ♦O 55 • '�'�—' _, " 0 til 1. s 11:::.-'. . /) O D O A1T I, 1-11 • [ 1 • . N __Jr:.„....,' ---_ o '''--I.T--:,)"1_- P1,.-- Y. . ______:.) __.._,,3 g H. r• -1 li'v.. Z.. i +p� Z ) pi 6. • K CA I • 9 CO 1/___ ♦° - U) 1W ,_114111,11 ' ,.. � � -� d� it 1: .._. I Ii I . _ , • I I:I ,k 71 ii P ?;I IC I 1111 j__ Q I -__ - VELD - - © - _ni 0-rl rte'1- .11is--14S—_rs.1_ u. o•cr_j_av I 'a Q-+ • -4 1 • ( I PARKING GARAGE SUSS I yTITIAT,INC.6,06.1.111•0 1,0141 »u.r.» ..I..:.wc.Al.y D! ' LINCOLN LANE • WEST "•r'•r'"•" `•"• - Y • 1•rC i CITY OF MIAMI BEACH, FLORIDA ,T�� , •r"N'A•WYK— •9 . CONIKACT N. PA-45 ................................ .... ............. .... - lL[VETEII TEMa 7 COECMit fiva E.1LiM I, it III l� al" I00�- -l•p0 _ • I i Exnt[Di=WW1 I [ 1 • Or[w I! I� i • I I — 1_1 '/` H.. 1,2%�z.n3 1 I .+-arARM..JOINT Itoo[t0,caws re 1 i I �' LA,EErouo Cuc catu.f `�I i I I ro ItxMo.'COMM a I ! I I 4 -10-=20E S2.no 1 I- ®nio,' �' �f�[[s11111ri1 � g 1 EEE ruoa_b a•1E1 " lona./umdl 1 1 -!'!_�.-I i- [x1oMo macMn 3 CEL INTCu CC 1 artY I \ ti rtT4 ENTRANCE fO.f��/ pm • OMN ,— _I�D011�[L•l0' - _ • •—[EMMED CORCM,.PLANTER a a 2 NORTH ELEVATION PART I I/8" • I•-0" " . z� OP O :s I1_1u[v.roa TamI.. I I �CE.cMTc siuw Euu.a I I En 0 I 0>0 [xM1ro DEatxi•EI I ' �` I I'� • i r !txMt[a�COMMIE j ;' I 10 ..•t.-Y.d 4 3 r..,..: NI • , I I 1 j I aM. �<W v a ! EDM[N CDauiT[ I I I 1 WEN 1 6\` ur..aoE ia.i [x.ofw Ieawtri i j AIN 1.1.0.2,1_4.EL.-lTY V Z=' Wm c. fl COM.-• ' I r[xroff0 CONC.COLUMNS ,Eras i `F • •I ,-1 i •• I I I I a__. r�oe�e_.aa Y J 10 I Elroy coNCNIEc I } F u u[TEL EYL1M- - Ert. ` 1 [EMt[E aOwClltTa� I O O r.�El EEEE�E���EI�� ( .-��� 1r[ I1a011__*[L.•tar a.fy EEof• j -1-7--1.1Ill_ I , am -1 I CON N. ' OM OPEN ' Ill /100a [L•atl ��w le�w • [aro[[[ CORK RANT. * -- ENE 1 /� NORTH ELEVATION PART II I/8"• I'-0" r.ar I MT t a A-I2 . 1_... — « 3E NORTH ELEVATION I/5• 1.-07" :":7.77.726`-- — . NN - C-I _./1- j—j- c m Al 11. 'y ' t--' ._'- -1 — 1 o Z z -- - -. - e 0. PI m Y - Q O. O tt-E4 -- _ -- ' __-----.__ll ._-'="7=7.-r z—r-� _-. V 4 1 1:1 1 1 g o Ma CD E* - I —i l---) -1 .....i.: 1...._.". 1__ li... .1___ 1, 1 e it l,,. u 1 il81. la �•,, 10 .j,z 1„o Ir t t. t t f ir. t t { i Lii r D; I I PARKING GARAGE 111.161&NTIIIAT•INC. wu•w.w w LINCOLN LANE • WEST I. (A;A 1 CITY OF MIAMI HEACH,FLORIDA Nw•w•MN.••ru••l•Mg.MC VI • CONILACT N•.PA-41 ••.•..•w•.....•. •.a.: .... ....•.....•.. ••••. .; 3 Y .;11 I. Dmm * , N IA min ,fffir //-1- m --cit) „. 0 _ __ __ 1 1=-11- k r r 'e ♦ R 1 _.._. __ — x x o o _ 0 -- _.. — R 8 -- __ .— fi . i _ - p 7tr N •• I --, _ N __ _ N -- / ... I I r- kr- 1— • ...1:__ - �' IQ r , 112 ,� g 1? 4(• R ti 4 w w G ar. a D: 1 I PARKING GARAGE RUSS i NTITIAT,INC. ru ,,.. Sail E ;i%{p LINCOLN LANE • WEST «,..........-...........,ar. �� : °:;::"':::: I -p371 CITY Of MIAMI BEACH,FLORIDA ,,,,,...Y..V'f..". ..,•• Nvw.•N.u.•'r.w,.NOM 01C. I 1 i CONTRACT Nr.IPA SI . ••.. R $ / I I __ _ / j _ __ ,, /c7(17 IT • y r__(__ • vi1/ _ __ .. -- _ _ __ — — — - - , 1 ___ : O a — 1 f _ _ _ _ {:,) i rn _.. I it 1 T 1 mmj — ' T'L! -'----o , --j_ ._1-I -1- wip • -T_ Zl �; l r = t r: r 1= Iri: t: Ng 1 ,$ 1- Ig , g IP IL 12, ii 41: _ii: I. il: it I I I I rt . • n r. i it * D: I I PARKING GARAGE BLISS i NYITLAY,INC . :....+::.a..... LINCOLN LANE • WEST Z LPt"I.C I CITY Of MIAMI REACH,FLORIDA „..,,,,,,, """"' • ..... ! ll • CONTl ACT N•.IA-.t ....... .,..,..w.... • I _.. ,_ .._- -- 1 .. . 1 I z , . ' 1 ; i • ni i v i I 2 2 2 . 1 2 1 1 i ] . .- r 0 \ 1,,r .• _1 /7 I • • . --, . , — ‘ , 07, 4, p %. 1, 1' .-- 4lI. "7" q 11111ri . .-{j- ' Ic.. ,i......; .7----"0 5 lug.i., • ..-...: • il. '4 4 i I' i I I -:--f-- 1 , il . •,.',4 '0 Fr '-‘t. ‘4•4--IftC - Ey 'P. r--", -! i":..."--,cr_. 1 Ii•-e-. I ! • 1 4 f... 4 ei. 1. • I .° ! I 7.. - III .. , • n ft • ---"d: : ' I 2 1° P 1 il . I• • ill ril i i. 11-74-- - 1 * Lc6Naorai_._="ii -•.•n•. -..••.• -i•'- _;L_=i...,:::, f•1z!. ...**.,i/.1_L-•,.,,..‘i‘...e.. . 1kiI.:,_• •• •.•. 0 _ :• • JIL 1., :_ , ._..••. _ :Ii.... - .. .••..• .1 . - . . i ..1 z . . • . _____10 ,Fil ii —il 1 2 -* - 1- .[ . III - F;! r . • 1 IIIIIID F i ef31 , 1111 , 1_ 1 -‘2 1- 1 g ...., -. 4 r 4 -. z--4 •• • I . g i i 01111 `55 k -0 it - I 1 PARKING GARAGE 11.131 II.NTIT•AY.INC. 14.011•1•01 4.1. Co/1.4 0•4.4.00.1.•14.• ;1! •• D.; • . C01•111.11.111444•1141 44.0.1 44•40.. 11.4 I •'"—I LINCOLN LANE - WEST —c--., ""-.'",,, ••••••• - oThl:-1 1 CITY OF MIAMI BEACH. FLORIDA „ ORIDA .. .. „,. .„‘ . „..„.„„ ,., CONIRAC, ......•111.4004•IMMO.•NAM••• f'n n PASS400.04 . . • -— . —. — .-.1 1:1 , • J • i I 1 • • •• . • i 1J • • • • • • . • • § 01-1 111. " . 1 . _ _____ 1 i 1 • . . • A " 1 a - f : i I : e i riN.V_ ,. : A • 1 k . • i . , i . rr' 2 1 i ; 1 i :A 4 I Li, ca. :11 I 1 1,;,04 IMAM& Elliiiiii: ti : _ I _ WitZat1 M _ II (!) _nril M "2 C) i 111 0_ 1 cn .. r-gr "7 .... aTZ:. I. lize 11 _4'7.I__S.V.1_.E.,V_Il_ E,.. Lt. 1/41-> —Lang - . .--r-bordlPiP/1473,0"/{71147INV•iti'4 71) ' ii.ffAC4 1 t‘ -. . i I 11 'Fi Pi ! I 1 I 1 z — . Mit_ ---0 i 1 1 1—1 1 1 1 - ,_ .— I_._ •i I 1 1 I iv 1.1 v lit F P P T Iii PARKING GARAGE Stiff&NT1111^Y.INC. CO•11.1••••••••N ••••••• •,•••••••••••••••••• LINCOLN LANE • WEST ---••••• -----"."-- CITY OF MIAMI BEACH, FLORIDA .,..c„„,..„..,,,,,c„..., m.::::......... 3 CONTRACT Ha.RA•411 .....•••c.............•......•••.•• •••••••.•••••••• ..... f 1 — — rr_ — ti .._ if:� _.—•L--_l',(__ r:f .` mss- � r r� -. •' r'•' -l:1__.-.Y-3_ ..417._11.C...., Le.. -t':Y_ 11• _. j„ R • 1 1 I 11 t 1 I '-"ffrilt- 1 • • . ' • • f R� • r{ , ■ r I if 1. h .It r S I 1rl 1 1 /1_iji _ 11�. --ATO; _Ja. --�/'f r} ; I 1 E 1 I, 1 • ,:• ruuUW6J�rMbu.iuu 11 urn/1 -:1.:... :. tK..:L'.., .. -— • - —i--- - -0, F r 7 •1'i ; r. •III*'iw`'r 1.4.1 ill, NI...uof"�wsllLI • I , .•�- 1 _�_—t t 7'....\,. -.. _ - _— _! Co) I i( y. i —_.yam fat o 1EF:; . t - :s II r -0- -.- : II •. r. - i • r. 1' I I b I PARKING GARAGE /LliiK IRAs,IIS Nu •K•YULUI. i'— LINCOLN LANE • WEST •�•`- • •�••• °•�°^ • wan I CITY OF MIAMI BEACH,FLORIDA ,w•••,,,r • •••1•••�•••••w•c I r • CONTRACT N•./A.RI ..,w.....,...... .. ...............,....... ... i T •0 0 WS'1. kg..- .-1L-E' �'-Y-- TIT.—_ .ii]iR r_ r L- . 1!y F r - - - s `- - - 0- --- -----4 .. N., ut 0 if ' - • . 1_ ,•., p i u — . I —I I— % / i. / R I. ..;\--..•.',/:-/_' �% !i' A ! ...i'.... I_ r-- ---- c! L• - 3 . - • j 4 e. IL -I ._ .. Er s_I__ -5_ff - - --- 1 AJ } - #- - - P /1 • m I �� R -, ti 0 __ ._.JT-ff-__..-----..j T-! _ 1 I I Ir III t DIPARKING GARAGE /MS t w•*Nos w INC .. fuu •611.6,1•10r•n r •• a..•u• a,f i LINCOLN LANE • WEST •... .. •....•.": 0 0 •0 1 I 11 h 71.7-----\\ ,... . WI P ,„11,51,1,::■a■a R 4 s•A-a -- F - - r,P 1 - - 0 --L-Y__I' - 17-f f"`— _�u �— A • z I I F1 g Y N I / i J , a A1 IA m z m o o z o 0 n T o ID o �tlY� c A __I!_L—-_._.1 r y 5 7,._ I T________,m, ===___,,___ ____ __ __,,,,,,, ... v A P D ii ■ li7LR9 A7• �' 0 AiA. - - - N I �; 111 .. ::1 ll� 0 b iix PARKING GARAGE PL1sa a Nrltawr.IHc.4.1.11.1TIITTG 41.161.6116 OTTTITTRATI NT WORM.••••01.TOTTRO NCI O' r LINCOLN LANE WEST "'•`"A"• "°'°• _ N=1 .1 CITY OF MIAMI BEACH•FLORIDA ' '""""�" "" MAY.K. • ,P '• . CONTRACT No.PA46 .w�P°eN.u.NNe YPY1l •' �""" -.........••• .... r_ _ ime_-- • NI li r__'. III lak . . .,.. is 1 iit: __C 11 1 '• 1 illi•' I 1 ':-S. I,li.f• ' gi' i I . . .I . a) 0 ._CK- c 2, --, 2 2, ,-- q 0 0 r. x 55 2, Y , . z . . -11 9__A-sr___._ CV _figc_ I . cp 1 :r1L,"_c________Ii• ,, ',Ala / I . _ F c_ ,.. • — ---f g I Fg .. . ,.: , . • _.. J . r . E gt 74 ut , Q —rnirl_.11-f la tlir 11 r- .11 a z t' 1 t 1 r III _ 1 I . ----- ra? I I PARKING GARAGE li WASS.....•OIVIIIAY.INC. CQD MU MM...... MO•••••0 loil••••AMMCIAlth ..=.::::••=•^:" •% I f 1—. — •-• LINCOLN LANE • WEST --- --- .. CITY OF MIAMI BEACH FLORIDA .„.„ .„,c.c,„, MOAN•SOMOM•/4*•MK.MC _•.....ocm•.......4.Moo• i ; •..-.4 A . • CONTAACI No.PA.-lof — . . . ; 0 0 i; ..ZEt -. x J a 2 4 RI 1 ., I I r I i 1 11 I • 11 1 4 II ! I . u 1 _ N _.•-• .,,,11111111F1_ --- I, .. . ..., ,. t 0 44.4,1- it 1 53 Aril .4., it i r ‘ 11 3.-fi" '0'• Z4: . / _.. . _....„ . 1 '4" 4 • T______ ....1_ , , 1 I If.t .,‘ ,___--.--_ --.---- 0 1,--- - ; - I ' ... ,4,8 • 4 • JU '. ,V.I.L, - -4 17 ;••,-, (i) • . . . I _,._ ___.t..r.,_1 r \,. . 1 1 , . S -, i A • 1A:1-A.419. CI _ ! i . 4 k, H z._, i . Pi a., -1 . . L • . .. ell% .„ . ni 2 Lk _ 4.416:1,A4wydi.... i. -.111141..ttitliA24..an. ' /i III= IIII I I I .. ._ li IM I -4. > I I PARKING GARAGENIIIRAI.INC. CONN...01. 1•911/•••1 ii• 41.4.•••IbUt....111. ',41; I --2• LINCOLN LANE • WEST CITY OF MIAMI REACH,FLORIDA ----.• i IN) fi 1 ....•SNOW••••••••••KK.K CONTIACT No.PA 6$ . — . . . . A . f -r ___ =. D I • ttM`" t! r.r•-rx;ngt.---max -© E za I ki= 1 j; S k `I II itIt0 7.0 F0+' 7i•l7-f•11,1 _—_IQE-r —.f l2'r ,3 Sett I� kili i_0: •_or '• ! IF. 1 tg •_— - .P75i:P.- 4.• / Ji 4 _� p N M. ` jll. j Mm +G ��. w — . 1 I j. r i r —£ _ _ , --4 � IT-- �11IE'' ___s_.-- ;�• z-0•.,I:�•j.� ,r_o• VE L.1 r — S 1_4.� liar+ — . —{ �T jei -- . - -- * . I/ i t+---0 o__ . „ II v zs =:::-----, '' , j L_-i°9► r w I W .o % • 1 I PARKING GARAGE /LISS a NT MAT.INC. 1,60••1•14 r wuc.....oc,•uc ;ii Z Ni 1 LINCOLN LANE • WEST •.�.�:u`::..•».......••,r,r. .................. is,':111 I CITY OF MIAMI BEACH.FLORIDA .err<orw•urc wncu .••. •••• I. 1 -. -9ONN TRACt ..PA-.f •••_ •• y o I - I .:--7--- ---* - -RI-- -T -c - • ." -iii•r - I:- +:a i•I - - e ._:t f • 4---.4 -- i V--•-i i 0 1 i ' !--- -1 1. i . I: 7 I . TTT — I , ---- _ __ __I , I I I L._ .1_ ... _ _ _ i. .i. ! •! .P 1 I 1 '• 1 -I :! I. 14 --'=1 -— 1 7 7--L" __.li °I I , 1----- . .._,.....,--IN. ,.., ,. _ _. I' . _._ . _ S 4 _____ _ 14. ip I- ettr,k , ... ,_ ..,. ._ •,, , , . . , '\11 l-- z -- - 1 _ . A M __ It g ._f f. . I]1 : ... (f) -1 I_ -.1 .— . > --i--- 55 l ---_---±_ . . . ' - A --I - I I i 1 - . -1----' [ . . I 6,..•1 -..____ r... .. i 1 i __. AIM .." - a ----- 3 I FilLif1 I ... I ---- .I _ 71 4' -E7K__' . 4 I_ :1 ' If4:4";'i Il• CITY OTcoMpoliAaTci ll 1 1 1 1 I >71 I I PARKING GARAGE - 4.0.1.11.11••••KG.1481•5 TI.E.A..C,IrlA,.,F.LORIDA ....„....„...,,,,.„. ,..c Ow.•MK.•K..••160C K, .....:Ili.•...N1 I.RI:....1.1..:... , .....N at 6.1•••••••••“0•1•• i'S., •• Ni;—:. LINCOLN LANE • WEST """ ".-----..--._ • . 0 0 - I.••I If:1" 46 • . • • I 1 1 I . (LEV•A/fiC. i .- .1' 1.4 __ • sisdookk Flialkil. • -- L..skagor. . min...elks A oss$-- — A A 4444 A Caw: r INILA ..Mob I. -....__l...17 Si1001.1 iskiSio COW 9 . . -1(1 . 1 .---. :AMOS.GANG MU. si•iku. fibit(k.SIAP. , — "poste cook: Aar...A LINK Ask f1.0011 L ,,V.pli0OVE ALUM'S.•• • '2..- • .11.s.•LOOSI L I . - 1 —.7'r: .ii.'_.,t,.i.:1.,V, ,,ti _ ikailiklikkats ?MCA.. Ai l f li•AIS • ..:',...,, ..t_ ...„.:•314.111.'WA. PUMA &Aim.rms. "MCNEIL --— . . • . tki iA"•,,, ,..1 e -.---- —I isro Fiji • • • • 1 ..... LlAyAll0AA . r) z • D . _ E AVAALA CoNc _.._...--_-'..-.. ....,,,.. ' ' --- '-*".• -1_ en irk'LOOM LA . . ---i • -- r. SMOOT 14-1,1ririk-4—-- _ 1— .... KAY•iyikill is Iliiiist rn . i r - : 1 fTI ''..:. I. fibilrl:0Vi0 < • •L'i — 1%. Z I -Y r•awn). S AAII•SAI011111 111111. • • . (..14 _ .•—rims..moll Oeiss . . ..... IS •001•1 km k , 4 -.. - cm.... ...um.. - 1 _ Ilhh 2=,1""`" .4....:.......LA: . Q. .......1.11001•1'WWI ... r----T-.LAATICA 1.4100./7A7;611 0. I semi N W. STAIR/ELEVATOR No,I I GONG 1.1.11211111 1111011.• ALL SIMMS ELEVATION MERIDIAN COURT a air'Ls.%c lax fi.o i:f rzaztv 7'...' A Mt 1.06C Ai SIA.a 555 0010*0015155 *: E L V ATION TYPICAL FOR ALL STAIRS WILE Ikl• •i 11 I 1 :li 1 >I 1 I PARKING GARAGE BLISS I NTIIIAY.INC. CON•Ini INA..... as0.1.•es 0 BAN.6 Allf0Lia IAA '— LINCOLN LANE • WEST -----"—-- ...•......•••••••• _ CITY OF MIAMI BEACH, FLORIDA ... mtm66•sx•Aux•/AWAY A ANIC.C.•A . ,../..C=1.11111...61116010 5C INC •••••.•...A.•.........as.... ° • .3 4 CONNING!N..?A•SI •r . — r.._. _........... -. -. . . r. i I I • . -I; - 1.....,,... El•4.10. . . 1=t..4. .--..1•1+11.* 41•••• ..' !It-7i tilFp1,* ! 1 il '* 0 fiL.•••a' --..- ilirscro“..aaft i 1.-juitazi I I• • - 404 Irdiiira.PliV, 'A ir- ,.. cogam saaa.me—( !,_._; ' i • rt...a•1.•••••so- 7AIIMMI' - . ILE.rure w•61. Cum.woya a‘•ba• . .— ....mut.-.- 1 .,' :,IiiiTy,. 1-4.,i,.. .:Ii•rb.nil-.-7EN '''''' '' .........-., !.1.—_,,, .1 1 •El H • I -o . () r. al•2?•• . r • -- ______ 1.0•01/..4.1 i .• ..i.a..1*.,...:11,* -.' '....7*.1 L. /02:12•...,. .. (f) Y3 I ,,,,,..,....... 2 • . ‘,.,,•••• . __ iL:L.-- '1 .4 •. f , . jr alemy to.u.r- i .• - .ror, - ', :. • i----i ..,,. L---2,-„,- 1 .,.... . , (.., [0811:4•Tt...•MI.8,••••1-- N..••V i is • US RAM IFIA 11.,141,..4.__. GO CIAO Ill"4"r4. 1 t4c41:11""4"-- ti. _111 111111 _ 1'1 -1.. • V.'''F.7.;.:.;.;;.... L:..4'4179•-•••.•uos•ra EV J i . . II III • I ›! I I PARKING GARAGE HISS 11 NYITRAY.INC. COM111/1.11016 40•1:1 M 0.1011A•004 Y1 411.lik••WI.•01.6•1111.r 1 g lk)/TH LINCOLN LANE • WEST --.---•---^".."- _ CITY OF MIAMI SUCK FLORIDA .„,.„....,„..„.,,„. ,. MAMA••INI••••••11114NN•itia... P Ji I CONIIIIACT N..PA-el ras•••••........•••••• ..i...•• _._ • • . . • • . - L - .. • . . — '• •+0.7. Pop •lar. — {i. .. �+ J � ^E _ • '+ ''' '.. ......1; �•••••• ".l. •—r noses ow \ «r•O ewe.'Ir a •NII.II ,44.--,-*,*.40.ila + v �• a'X[Y .40 w _- INT[...1 f so r•. ~I� J:K ���•».IleJa.,le i ,'• :�-' , CONCRETE FINISH NO.1501 •'1mu'••r"1.i'•. s ��i r_i-u I \ • • e •••� at" ...0 rrcL H.. 1 '•e - w+ "+�..-•wc`- y'\ I •-Acf Y Ru.OF.. r . g I • corp»..�M" �� i —! 0 \ 4 uwrn °°'r rata rg:•.w ;`T—/ f.w.,,+IJ.a.e `.•y"r r y N. ; , rl >« i "�� 4. I r I . o r. o. + I ••`:ae\l I TYPICAL TREAD d RISER DETAIL 0 1,..cargo a. 4..ar,o.f I " �—� r.r.,• I ,I,••not iaaal I GROOVE NO. 1708 ANO TYPICAL CONCRETE j •,,a+r"+mon' - CONCRETE FINISH NO 1509 STAIR RAILING Q - - .•ar ruu.2[ 1 Poor I • I -.. _� rte-- • •J • 1 TYPICAL STAIR SECTION .• :wVO.ciiri oarl�,\ 1 e.'••'i01(11'unaK 9•t 14. =,••'"0• .---.. ..-.—..•_*MIN a[.r I ? U•S " >jI 1 . .ufe ♦4. •�. I a'ee ..area . , u./ee. I e.t.a �..' ~' COMA `�// a.Y�J••oar• :V; f II i• -�tu I ••I I i_-. °" ELEVATION SECTION !' u .44 „I wru'.w.us }-r: • • r. HANDRAIL DETAILS = A HEAD 0 I HEAD O ; ' 4 a. / . ,.a4!`."`..ao rr;t ,,.• I—I a D • t.•anr ur_ r1 '+ . e«y_ . v • i I '.''' W 3O2,,...112,14/•. a a um.* lwl I a i • - e.r.• , 1 'lI - «rag ..1.... i._.«. I Wu4..,, 48.11•—. II :: 4 • y:1 1 I i , < :::,. oar r' I +,[»» ae, ° HORIZONTAL MULLION Qa •�f J AM8-r��K.t�ts� . a„ < • '•`L I Y 1 o I ' S:::"J/ ..oar :.e 1 I I - - '-r tku r. O.Z PLAN SECTION AT ELEVATOR TOWER CORNER !70 ,,. - ,. .. " rte" I . © 0 L—e•a•.[rf:I4a• SILL u.... A-27x , • ' SIDEWALK a FLOOR DETAILS METAL LOUVERS DETAILS . 32 »all FULL Sag J'.'.°• STAIR DETAILS .-7..; r.•.••:'•• a 77116• '" . . - 7...:-.;- . _1Lir --,...•4--_. 1-- • tt- , •tr-r--1- y____IEt___7 ..........- 1 . I :0 1 . • • !,,• -r.rrtm..ow ,-- I : ....__ . 1 _ •.....__,. -.--__. .7 r:- t• ..! i E -7---- , ,,,, „ 1 i :•.•,.11.4".f;; ff-----' .1 1,r, -11. )-.1g:.. fA,-,- --_•,__.: -1... .. .,, ...pairii•F7 °. : 11 u4,4ve 4.414 1 M 1 t 'I -.7-4 -.-- I • : 4, •'4 4 . ..,I ,..,r4 0, •,,E.A. .... Li , - . ,-_ • , . :,. it,: tt2"2.-•=•>" '.7.-i-Vgr""'" t , • _-_,I.e._•11.__c....1__Lcom.y.•••• •<irl XI.0.!! 1 4 J.... 0-11...,..... c. s a r.: ___<.;-_..1,601- - -LP" ,. •pat r VI. "."1-VA• . ..:1i •0(.1-_____44-•-"-" --- 21--;--cr..i...- _._" 4.1.-_ TYPE CI 0 0 ' ® , I -_..._:___..____ ......1.2.,>0110133.1.• ,.. , i 1 ' - I 1. KW 11.MIL nra I; SECOND FLOOR RAILING ELEVATION 7 14 DOOR SCI-IEDUL ....., XL 30001•00.0 0 al 0.0 301.....000 • • . - • , ! 4. u.......,,r7 . ..Nvnive l'i li' r %, ....ow... -_,,-....,.-_,_ • . . . ,.....•••01100A 00.1.10.110 ,-.--- ...PA ATM.011, 50 .: DETAIL ® . 3.6 I! :::• . AN OETAI L _ -Ia.• I -71 .'4: , ' ''' .--oataxtaroka. ....0. .....---.- PLa ••-, . ,..• ....A....Atnom 1-----/- .------ce .:I' • r .!, 14 'I. i . a. I 300 0000-, ...., ccrAIL C) Lia__4 tl.i 1 5 I I____: -I l!i I. . SECTION THRU RAILING JAMB C .: ) 4i.l ....7:W.. HEAD . *Am .....•..... i sat ; "--, --01-mmarewrr r• , 300 30., _4__•,.._ ,_ 1 , ,..,„ 3;04WILL. IMIffd * • L'I-.71.---!;-.I l:; I - I ' .\ al.1.0rtes00, 1,,,,,, -T;;r X .:7••=. 7 f',....7/'.4 .71 ........ u, u.,,,,,I .24 ..,...... -T773 V.• •ti . . ._______ •• , i • 7.0 0 30.111101 00-00 00.0.0 1--.-71 1 0001 I !, ce . ! . . EL16411264 AT FLOOR \ eurvitarasaasee•a 066c ' ‘• ••• •••:-•• •1 . < 111 u. • r : DETAIL® ,_,______, , , , : 5_..._ 4......7;-„I....wa cow . LI Z 4 i mama...1m. I 1. 1.0 04:0 0,4 Mal 014110.0 3111001301. :.; i i -----.- 1.- ' " HEAD 0 JAMB 0.6.906.6 a Roam u NTEMOIATC An 4•11.a TOK OMITS TO 0 i.0 TYPICAL SECTION 1411.001Z 1 0 I . - .- Z .7:4 i - THRU RAILING . .L 0 COAT.141,•4.11CRT 060.0 4.... 100/1 COAT..MITAL 011.013.13 i•COATI j i 'r itttS 717 oaraL 3c.....--,c,_-,-• ,:,, F...v.... _ ,..... 7 ssa. -J It cl 0ATT•1,30011T*******1001Y C00110. COL.,STOW MD '•i4,-.07:117.' .1 U V Ai'-..V, i.: * 1-0- 4.•• • 0- ni'424:447...N`ATIP.A,'"1-!1•°, 1 , i .6 4 -I c.; F.,..rf•LA.10101 PALGA010 0.011 COATIrla •. 0_0 .1. - - . -1--3 13. +.. LC080.RON la COLOR•OLACX _ .1 ammo 1 1. 1... ALL PRA,a,A10(111.25a 11011 OW..013111 • , 0 SILL 0 1... SILL ........oor..7•030100.=LTC IITC.TO la 00.0.0.1.0 1 . • 30..... RAILING DETAILS DOOR FRAME DETAILS -- - --- 4-28 9EE !MEET 0 26 FOR STAIR MAIORAIL DETAILS .!,i21:O.,,GIJARO RAH. r.... 3,e-a' --.-- 1 n.....ow on<......• .wo,, ............. • "'•'•'•' 7306 . • --- _ . . ... .1 . • •4,,IL„ 11,... . ,i• --••71 ...CMG tel. -- .1 A. ii - . .__ .1' . , .---.C.0 RION--• . ... ' • r4:.'4:ri;•°•IA'47,..1t1".. ; + .4- : , ______ ..... _ a-' I i A,t„M•M,.IA.,A, •OMWMI.M — I L---AlKI•.MINGO,I OMr,• • A1_,C,9,)'1•A.1f..-..---.1C-V..A,!-.."1^"*."'..•.;i. . •— : 4 — -- I . • E , .. — 7.4.,, .. 'Wr'.'...P.*r:ar4=t4.;..1r:1,'4.M:4494,4r7.214.!":.%.T4Z;0IT*-T. i;:2A• .1:i.: 1I1;• • PIL , TYCAL DETAIL AT HEAD® „ ••.,3a•••4,.- 1 i• i !•-flre="1.1nr:r.,,,"'-, I. , 7, S I ' maga moo J1 1 . , ___N ,- _ :-......,Ite M.m1/-1 1 I 10•011T:ANT— i , ..l.. • , WM.M..-. 1,10 A....•1-"•'- SECOND FLOOR PLAN SECTION•END DETAIL® END CONDITION-FIRST FLOOR 0 0 1 4, • .... 4 v; ,•• __-_____ _,_._ — . "!---—0; .1 4 .:4 •:. 4 • • " . A . C ';'.'7:I. . i 1-Zia's"r4rP 0..6.1i , OCOT•WM MAMt, V I 1214010111 X..movtAfA / \ 1 ...: 11.11 1151 ...e ' SECOND FLOOR SILL DETAI L 0 / , ! IC,4 371.1 MGM MAIM A Mt OW-, I IMMORTS-.‘ '1 'AD . I i:1 1 ! I i : i. FIRST FLOOR PLAN SECTION AT DOOR a 7 DETAIL 1- / , . comultra OA, ' r :: I ct • .,...4. " 'I 4, =KW(WALI.--t.74. 'r— ., 11.,, -, PRAM MIMI ,4 ▪ 4 H .• I: INSI DE CORNER® SAMOA? Ill. L7 Z 1,i • d•$ " COWIAAKRIS I ', •• i.••• . '' ". !• ' .. '‘. ....., , 0—a—u l< ' - , , Z =10110.1.1.4 IMP-. .. .,. • a 7 7 . ,........ Z 4 I • a. .: A .'.4 7'. ,,... WOMMI U i a I ,...v; cOR.11 MIA /Y.— • r.. ".111110•WirMi.111041 , 1111-.A.t, 1----- t .y,e... .gryaaL, IMMIAMAMI. , :. 1 Cl•Z).I.1 :-.-1 FIRST FLOOR SILL DETAIL 0 . FIRST FLOOR PLAN SECTION 7.7.. .....re* CORNER DETAIL 0 FIRST FLOOR HEAO UNDE: SLAB 41•11.111. X O. AND SILL AT LOUVERS(2) • _I__ _ a..7 METAL FASCIA D ETA I LS ..... s.r.e A:29 .....i..* 00000....•• almm, ,• „,..., . •••..,e•8 5; .run.wrcrw nm 1.014.AI. I -n n 1101 r a'V r Y•v..rl,. .r.,u.no. rv..ara m r ow fri.w MIAOW ..,..r co.,w.,, '»;o:;•. .— - err.,,nr n rs RAT AATITAA1 MO he TOATI MATT A.. 1111 11,11, .,u 1111,— � •wwan:our.w .ESA ..raw AntAto 1=�► r1�%/ 1111; i :.,. • . . 0. 1111. iBOLT-FASTENER DETAIL FULL SIZE , I1 1 �' I. it ► I I! i'; 1 I I 11 I ' III < II ; �ii I : III jl11Ij1I `-ljIII ! IIII ! j ; �I j I II I I ► II { I • 1 j1 ' I I �� I I j jl 1 ; I a. 1 1 :I 1 II 1 • I II! II Ii 1I Ij ii j1 I I j Ij j II I III i Ill 1 j II =:_ • jI a I '• •I 'ii ij II I. 1%I r-.' y"y II i' I' II i I I I �� II S / ii I I 1 i I,r -3.. gt� - `! �1 l j �. (' I I •! I_.___�-< � �,s._/� I I z• _ II ' I I I I ,� _ ti.- _ it ji 1.1 ,II I , II I `i 6 . 1 $3,(34 ,-, � ,.� 11 •iq• o II ii I • I �i a rZ•s 1 , 1j ; ' III -✓ r �+'� \ ; I I I .g] I I j 1 f :� i ar.- !.� I I j _-_-4 ', „., 1^ I S < VI 3 j II I I 1. i t-a� •`�X'Sr-�''; �5"."-, !aye 1, j!I I 1 ! 1 1 I I FV:41,:...!:3, ,`.� i I`� Jf l7 >O •II I I Q >. I 1- Ij ra I I r- 1 I I 1 I 1 ..,yes.'_• j ,1l ,I I ~f' tlSjIII, iI jI Ii �,. .y�? 4.. I .� Q u+ V II" I J` 1 }t \ { 1 jIl j1 II ' ..11` ,' IIil li Ilia j '` j ; j I � Qm 1 x d J V j ! �. i7jl l j I i j1 j I1- zZF: Lj +ter /' ^ <_ !` �� I/lf j I I I I I I I.17,........,0-_,Y,...:1.-""j. j j j Y f I 17 I �;i I1. rte" ,,, I 1 ; Q p II / 1 I/ V I j I II 1 li\4 ii '•I.11 i I I II Iii li, L� 1 1! 1 I I acv Sm ryp•r.•61 III../J '....l''..... /� SCALE: P••I'-O" L •_ +1111..1,iwi-4 -I— A-30 .• 32 METAL ENTRANCE SIGNS "' `31f5""` i' ..it c .it • I ( - g 1 ' r * , 1 1 I ..1._______,. 'i!'.. D iTH__±. 1 I ,,. x T1 ! ! • r b C�1 - 1- It_ -- - - -i_ .-i I it 0 I� NO® ri 3 IC). S - MI 1 , 04' 1 I- on 8 I . !.i.- °"14•1-" 2.3:4T---{79dr—A----2.-r--- _ - Iv 1 . JU Ir G • II I 1 e� IP• 0Ji O g :Ft i ill • I!iIIII 'D; 1 I PARKING GARAGE KM&NYITIAY,INC.CONIACLIING..1.6411•11 wo .....•....o.lAl.. "W=i{ LINCOLN LANE • WEST CITY OF MIAMI!EACH,FLORIDAAW..•SWOON•MAIM..•Md.NC 1 % CONIIACT N..r A.•I r....... ew...o.u.v.c1.. .•.. ..........a. ...• ssiz>i �q1 y 1 o i d; _ I z , i. I. 1 , y -4 ‘ -r . \I 41611, i 1.........„, i i I__ ___ ti „,a, 4 __ 4, r r,}_.-..._ __. rte �.r I fp1 i G4 - .tt,r.2 r.r.r r_r 1,r r r rt r,r,r•r-r,( r r F rir'r,_ , — ---- _ ___ ,-- i n _ - r --- -- -'--1---ir-- - _ 63 1 �.. . i Z _. I I K y l' .1_ ._ . ,lam,. ---__ _....r I ... 141111 4 i �� S 4b +'4 b4 � t��" � 7 I; 1 it N .... .i .. €. . .. ia#P ,I0. 1 I� — ----- - --- --- -- 1,31-.: \ - 'fE If� t'4'Y:'rYSi !t!"fY'-- l t•fIMT•'- - a ._.o s— Ii. t t� Ioyti l o id ' i1- �� T (: _t , ! ki - N ., is _ °XIc j1 4 7cr : I. # I. I5 iF 1 i !� = yo 1 ( PARKING GARAGE BLISS i NTITIAY.INCCOM MO Pt&i w r c..,,..•,w•,.,., �!g I , LINCOLN LANE • WEST :.::;:."........ f N'r..UV� CITY OF MIAMI REACH•FLORIDA Irww•W.uw.rwu•u,nuuc.K ��. CONTRACT N•.fA-M ur.cow,u„.wo,,,r,c ..• •.....•,.•...•w.,.. •••• 0 o Q S V NT.- NTM %TRS ET _ - O.oo • .' I .s . � 1 re•• � au s[ri�.. an T.sit,. 9 .foo _4„OT.•' Ari 7 l-.�_OT _ I 01.1e..39_ Or. i OTf� I 's I I NI. • , .'S 1 I roe a I 11,11'..1. t re•cl I .. , ...,1 I O f i 0 Off= O` O O ! • 0 Q W< O II �O O• -�®r l—Q --O CO - %CV ilf• T. li w T. I. T.r1•C- �� 5 661.11...1% V.filO S.�_ • I 1�� I NORTH LINCOLN LANE .• ..w...�C1•41,1•404.1• .�. so Z TS3T BORING PLAN • \ • - • J W•` CITY o. #41•1411111•014• • •+RRINO ' - - - LINCOLN LAN[ W[.T . - ,401••••,401,401•••••10 •,* 0/1-0/1-1-S/4us TMC.g •+S•OC + am ..RINC • • LJNCOLN R. a.� '�' - - RYr CC./ILTlO.OMCs.INC. ,•,,uf• _•bISSI . - - ...wlw. .w.w�n wT. X2 1••..1_-_•••••,171- .. . ..1 • _, .,.....,,,, ..... , .1 r. , ... , - 1 'i • , ii iv I '• ! •‘. .,0 IA . I • '''': I ,%c ' • I ' • , I • i , • . I . • I . . I • . : : . I I . • I I - I < 1 . ,i MERIDIAN COURT el(< II (fal---.-177 -17 -116•SIir-7 --.:4' ii) fl[q.11 1111;111110 III.I 1 1 1-.14'. 1 -I• ! I it-X--;:- • : . ,t 111,1: .111EMIM , -- i •.- i /7 -....,...__. ,. ‘,. ii , --- 1 1 b! : • / V 0- T. i 0 ; • •i* li : - • 2...,-.1:.-.:7,T1z—--.1, -ii!,,i;tii Ti.! t:;..I.1• 7:.1....,_....= 14• o - 1 . -f • 7— rr1 i '/ 1 ! l!11 " I :Ill I I 4'7: : ' -'N t < z _ L.• I , • u: -, •-•--::_11 ; ' , 4 a •- . 0 . . (.. . : : . . • ' ' -.7-----. . . r P [I H • I i - ; 1111110 I 1:i...i.1 . ,j , , I 'i ...' . . .-..-,.. ---__ _______ _•,... 3 r I I 1 I II. ' I, .. • . [ i . tithr . . . 7 I irttl I II -• 'C ----- z- . 2) .--.H .— I 1 ' i I il • .......t." •-.---- . ...._ , .,..r.,,...„ . .......„ : i 1 i4 . .; . 1-..'- -.4 I i r171-1 rr"“tZ7.'•ill 61*i'''''"i. •i 1 r 1 .ii 0 •) . • 1 i -1-1-- '-- - ---‘41 •fp.i , t IjiiLliti:11T 1-1 II il 1!I 1 1[PI ITT[id -L-1 1 i . • • II • I ' r I L 10 i —__I 4,I 1 i ! ; ii :01 p_LIJA4u_tilt tki_II I 1.1111111.1. . 4 1 a • . • _e___EILIAtiliiri-vAltALA..10WIENLIW I I lit 1 .1 1 • P 0000 i.: . • ___,...._÷,„„.....z 7; .Z ei 7.tt'llt.' 1 l PARKING GARAGE .-..=:. ,i.••i•..,. .i . . COM.1.11.•0101..... ' '4•.1 •"••—••^641•1. , LINCOLN LANE . WEST ___ • •1TII.EAC:IA,..,F.LORIDA •.A.„,....i..........„,...,, . .1.1•WOOF•IOW..•A.10e NC 1 !t 1 1 CITY.OFc.64.1 .................... r4Aci .. . --.""— . . • • • ' 'a.::.�:.•. ••• •••• J An....,t+... -.2 j. s. - NW9• ONI W�'YJ1 MOOna....Willi,' -• NO&.yONnOJ1 . � . _ I - ...._ _ ..-.__-.._..... _ • • 7 = �� ^: www.._ =__. «w M ,1 - 1 I• 1 - -_ •i Jon•wilt i • :.... J -fir 1 .know w.»:. I -1 I`--�-'!M -=--J.►s Frac i..h-..._ -.' __.- I---- ---- -'- ----- I —'�, <Z ( i.... ! I ` 'i�li..1.---^•.ww'o..i: I I ' I n D I 1 • _ F '♦ J----- _r--r =_z-- T •)I ; I i I 1 I k.f M - ' • •s -- - Vii; - — =>zn • j • •P T T 1 s).w,.kr 11 2 k 1 O N ! �I I raYrrl ,nnn w.wl..Iranrr ! II • .••/ Yu..4.j1 .. ,t.eew l.•. " it.•-.. . 'w......1.• +ru„s+ut I •.w.r•.w-$•..w ..y Nr»nX � :; N I ti- -- �--- - n I -I • rim...,e,.IJMw wyj I I I.. .- - -____ .__._. _It I -- w i' I i .'-� - I- 1 I i ' =i„ 11 I 4 \ Jefff..-...wwstt I 1 r- •, a«- 11! • /`tt wY ..I .•..e)r...J.. ...'"A'.•r I I.-_- fir; ^ _ - ..1.JJII I>•. • `JY.0: t.. • r- 'f7t'-'-! 34- � I- - iQ I I ..err•rr *e..•.)t 1:R"- ..•w i -_-- s-...e - :•l.F�- t o • r.....0 , qq . n. Q i •n .0 1. - «.'.:.-.7.7. _. . .-_ .._. J,, --. - ._ _. _ ...._.-- F [- .ii CF • • , I . I 2 .•f• r.w-1 we w. M I T --: J/•..A.4r- :I 1 k.l f •I • I,' I ...,......,,,•...Offer �� • V �! p • ree,error. �^ • Now rm., I �vMI.t11.s 141.1 N..e•..1.`r-� 1 ..."•••••••••••••I.. ..).• I , K.N.fI..•rwf..-OAir err t, ' I • r Y..I/.r•.wl.:I _- r..t: `--A II.w en i I II (f 1 11 I -� I 1 -- ► f U f1 • J.M.W•..•••`. -..es,•I:wr .M.rfs• l —r.el..r r.4 ' :ry- ^ .-•.-[. • •• • - 91 I •rf N'1.J------1% -_-J •a lin yr I_.—:—..—_ ! • .�....r....rwrr !� 7 1 . r ° ° 03. e • .e ;yf .o. is •' E F 10' `r.r..+ .Mr M M j) ..."'"'"Z2 :.�«rJarr _iAP_MM�YrYM, �MiiYMM�AgIwAwwW Y �- - —. ._..___ _ r I f•fIR • —1 1 i4 .rw' J_yrN'laraJ.. 31 ..w.• - I I.I • e• . •i .wr I ill,.rar+' - ..«r . 1! i LI -- I vy T i a air�a.' i4 + -c`xe-na%s.- I =. :: 1 ' (r'-iFYee Mrr, p-!! w/r - . A•_ _ _ ,�1 f;Y}rr � 1 z 4.aa . , Jar A'•• , JF f' . ILII — v.uow.r -- _. __ i, -.... • -r- -r 7,,..4w Nr1•VI 'III ".F•f lr,.wr/.a, I I I :1,-4;n.•aro M •.Ja:a'aafrt nw a I 11'Y. I I _I- -�- - •F'f.rva.••aJV-w • 1 r+.J Jnur —1-.. --a. I 't. .� 1 w.••i.-war -- 0, !; I , -A-- I ...x F1. 1•IYR _ ___FYJrNat.�.4 F__ -T.__.__ -J _q _ x..r! -`__M :vfr.-;.--" I i 1 • I , a. .••••J ; I •I r.w•-.r•J (} ;�lJ.•.••m•l 4 • _--) p_. ay IN r.•n -- ,t. I ,L111.7.::',.......... _. __.._.._. __ I WI st•a± __ ._.-__ _.�- I ' I , , I{ :i I _ I _ u_,3 `•!•«Y.—H'aN !T'S rM....a•.J.afa.warf r,�.:rwN.:•'ol..•.�/raN i.+✓•J.'ON.7.n.a . II 'Van.* ! y L. -f Jr.••rp)J•'M waw _ ._—_.T_ F').n.rl f•N'M.•.Y I f'f ln.wri i}-+.arta '1 II'r MNW IAI,.•. 4 7 77,1• Palo Ora I L a 3 ' —I -. _ _. ar'd • L . •' -I.-9 Sri ar r aur I. I.. Maar yt a 1•.p!Masa.• 4• e• o•rearr n• I I 1.•r•.•Nre raw _._...._— I .. _ .. Z S , ir 1 • I n 1. 1 . \a••••r••a.a.J `la:.,m.1•'rw•fI ; I P I I = 1 ' I • II 'i ! vnru.uJYv vatrr...i t� 1 r I I I r I I i • i N S .S II II- I I- , no..., r.rea•Cbt.^ Ir.&ere alma—' ; I I.•J waa.• ___. —__ ,••••••••••*- a.a/r�• I._.}••w.a/rI O••...Nre I i,iL.„....----..--,....\, {..O ' I { •Yrwrr ..Vd•:wN 1 N.r•!•wJ fM••••r• wyd•w...• .lual0.•L... ty I + I ra.ml*...fa•. J I I I I i 11 I 'wx u. W O I Ii + 3 • I I I ■♦ I' Q W u. i I I ! I 0Z<: WS • I Z Z ft 54 o <�r rvaeir I I P I vN'u.civrdN..a...Jca '1 I i. I Ir...•�..• —.1 u I C., 0 I I I I . I - 4 ct 0 0 I Hi_ItLI......+aeM Ni's-i.�.•s I ;j I J-� , 1�r .a•u 1 Ik . .'11 J'r.':,.aan___ N_t•rn•Nra- I2-Z-....,,,,,,,,„... I I i -I - .•..t.r ..d• iF:11-n:a•wrr L.;.- I. I �!aM i•I.M�' �—�.�._..- , I ' ��p .N...,..• Aga 2.•01.00 1 �•.. S-3a 1i5. ' I .r I ''I I a rent lllnArloN ei FIRST 1 FLOOR FRAMING -PLAN -- PART I - l•...: - "•'•'a" r... .. U o (• (•) �0 (•) ("I (•I (i� N, I. . `I . . • • 1 i . i I I I ,I `: _ fes. II.J - - it Thi I 1 I I I'` _a I II ' { I 11 l ' . ..s,'--,_'7:. 1i' . �£ I 1 II " it i • '? it '41I• •• IA.11 �H ,I I; 1 1 I I I Lr$ I I I 11 _ j t (_ III e I I � II '_, ip - � t . k. v �! i e M I, II• 1( I I I I I I jam- (>S I II I II I I �'I11 iI II II I ISI I I °�� I II II I II II '� 111 i • tIi I ( 1 I I'I I I� �I 1) I II I "II I III , �I;-. .• — Ir I'I I IIi i I .. , 1 I '11 ' III • z. ' I j t I I i ( I I. I I s R �hP�;:. I II _y. _ I,i ,.,II ., . . h� -w 11 � . '' i. I . ,� 0 i r I t I I !I 1 11 r`;: I I z Il r I• 1 1 I F I: t li II I: 1 I I I (W ill .1;1 II i� it i. I I1 ;�I 'II ,1 II I � II II I II ii II Ii II I II ii ' III I II ,;, , I . I . ii !I I !III I �� ----I I- 5II 1I I II 1 , I1 = I1 III I 'i -..II 111 ,....•..II I I� II 1 IIII II c II i1 ', II , 1 IIII I II , I , 1 I I .' • I L..,C I 11 I III11 ��., I 1 ,h Ir 1 ► I1�,' C "'1I I •II I • . I . I.. • II . i � • i1 I r r- I I , �.'. t, I I —.-N`1' I .-'MI'_III ..M/' 1.I N'/ I. KJ-. .I ..f. ,I N"I w. I. Iy�'!F /�' I I I, I I'I I • �— _ I IZ j , 1,1 1 , •• 1 ., I.;•r II I � 11 II II I I I I I _ I.� II it It iI ' j II �, s ,._�L __ . --M k rI • N _-r__ ray:_- -�; ' .11_i_ � , — ____,I I I t -41 ,.1 f-t �T----r--Tr- t--‘,,i - --1 /;, P , Y `;, ( ; �Z Ie111 $ I. _ul: iI PARKING.GARAGE "1"a NYIT"AY,INC. .u•.•.. ..,u••..:0.,.1., 'i °Ch ! LINCOLN LANE WEST ..•..•...•.. . " :.....w.•. 4. 'j i1 I CITY OF MIAMI BEACH.FLORIDA r 1.0015.11,04 5.11VoLlb.INC • I :. I� •T 'conk{ACT N•.IA.I{ , .op. ....o.....•..........••. ....... ............ .: ••••. III -- •- /� _ I _J' _tom Ij F !il (1"1 Ilq Tft _ —hill ill J \\ IF __I .....III.._/-* 3 -"ill -I i----i! — 11 i'`,---_-_,=(.i' — .. . al Y� (n1 II� ;I II jI. '/ I IIII . ) II I I 'I 1 'fl1 1 i I � -I-• I II I;I III = •I . - :L a .- „ ,. _II` III-, 4. ki .1I4An.. .•IU-,....,I', L IIR ! rill I , , II I Ill III il I 1 . ! III II 1 I oil I II II 1''' h� III li 1 I I ,. I;1 �i; I. -/ I \ II II II:I I , I i I i I 111 III III I;1 I' ', II aJ1.4, i ----•1 ---- .1 ...._.:14_......_ . -- I - III _ LN.------=---:: �: I -_ jilt. '�;j ® I_,i I• I iIl li • I 1. _ . 1 I I I • ., i (o) • I I II • Z iI / ' I • I' I Ir 'i III II II h 1. II ill it \ ;I II 1.I. I I r f; �� !: I II III 1111.12\ i; \ ,I ' f I 'i--.: i 1 1 1I I I„: 11 Zi! ill= I;�. II II II`'. I'I' y1,L,3 I N =11::.3••; III :^ I 1i l IIIro 1j, I.I I+ it '{4 \ -' ae ' iA 'r— -- t. 1 '' 111 ' ''I n r:...1 .11 }I ! s`• 1,4 1 1 7 I i.— I '7Y- 1 -.-. II ,rr+ra7 I _.1_ -t- -it' -••'- i1166 . 1 t K, 1,''w - it I I 1I ' `I LI I '! I _ = vi I'...._I'I III I1 I :1 . 1 I:I el �, II id �: i I ` -rrr rV- .r�r j ..:r 'I III I r•r . 1.1 = 16 I �J .I .Ir!t•II III , 11 11 i11 II' i;1 r •i I I:%: I' 1.1 I I I • I 1.:1 Ir li: 1'� ,It 1 � t I r I� I.4 •'�'1� I P ni .I .�'°.,; IliII` IIl III` .`' ''I' II` I� I!I I'! ;� ;t ; II ; ' 1 ! I -- . -I - i31R A111 ;i . i s I 1 11: yI, I I 1! I: I I . I; .; I I I i1 Iii I;I @@ I1 I I• I Lr 1 _ II . _.. I. I ( 1,1 I Ii li I I —_ — -- =- -- ==JIB ; �+- — __ 1 I I 1 .fib I :.1 1 .I I ,u, - ! I I t• r .: I i I ITN t U C, �., 'Y• 4. (I. l I TE. e R Y fIII.I ' I2(,): 1 El PARKING GARAGE Diff A NTITIAY.INC. M0.41•01 r 4u,4411a,A660‘141111A660‘141111Is av LINCOLN LANE WEST --"•"•--"•"."—^+= j t� a • CITY OF MIAMI REACH•FLORIDA ow,u.uwc. "'""".Y.rw.MOONY,NY;.to • ! tl t - - CONtIACI N..IA.tf ....•w...••..•............... .... ..........•.. r I, (I1 1(i(; fir, (a. l.: 1 �tI as i_ti fit:, I I ? r. 1 .(� i i j I I (ly- 1 ., 1, ', t III -1rt _�I 1I S .1 •I II y I • .1 te•- r.Y-�:_ . o'. -_- 4II • I 1 lip 1 I I I �I I 1 ,' , a 1 I, /i ;14:1 {.:5a=jlj 11 III I II l I 11 ! I I i '',�/ t I 'c , 1 C ill lF I i 11 I.IIS. 1 h• I I I�I .41 LI 1 1'1 ,I i 1I 111 i i o _ I _. I r. 1 1 I I 2. 1' 1 I.l 1'F 11 II l 1 I I 1 I oti , s. it it :I 1!I I I � I I. II !;i 1 1 I i//-rr 1 I ;4 11" II '1 :I /f, 1.1 i 1 r I Y L1 ,I,I 1 LI • II I'I 1 . &(u_, ._. _t._ _._ .;.,4z.ay__C �.lu;i,. ie- I 1 • II I' III III 'I 1 I - I I 1_.. 11' t Al .. ii I II .I 1.p ' 7' ' Ili Il �I'� I� II Il III II r. i �. 1;1 l I I I ,1 I I I I I Z •c ��1 . �I ,1 11 1'', III 'I II II I I Clea 1 -11 I i'l. • 'I-- I• ' I' I IiI 1'1 1 I1 1 i4• 1. 1 'III 1I 1: Ill II III II I II U �l-s�� III I II II ` II i1 I.I I 11 II 1 zk- . :i fl I t/ I" y h � I: L 1 4. I II i._ - ..11 II• I - III. � IIII`.. II IL i� I. F I IIS ,. I I v 1 I,1 Iv i i� 1111 III 111 1;I1, 1 1i" ;; - .11IIII 1 ,I r ! 11 111. i1wa,� 41- —u,__ l L.a_u, ill 1 h f I; I. I i 1 li_I III 1 III I1 t IIl li 7:1 I II 41 I wJ. I -INN. _I r 4. .. 14. ,..i'. s' I I•) IW I» �� is 1 it I!1 l 1, ;l iI I, D.„4, , 1:1- ill l l rwi-II I rr ;1 _�. 11 -4_ �i -..- ll -� I �... 1 ..- '1 IIS .w. I 1. I I III I II 1 III iI I' t 1 F Ii IP 1� rP171 , ,' .lir II' !F 1'• •lid I C 1 ;;1 -0 »:,�II•,:�__. I w,l ltl. I1� II II 1.1 II 11 I I I' 1 01.1 ;I1- •e:r I I . yr i ,.v »:r •.:r 1 i .., �1 !•.• 11 ••:r I i• l •ill I1. lI III j li (;l 11 `( Z I 1.�IIi II I I! �I ,III I I Ii ! I1 Iwr Jlla ,�,:. l _..it r • I� 'u I au:J•l. —I 1-• I 1 1.:11- -- _..._ 1 ^ I� -1 !__ —}I IT ; _ ._._ +. II f ,; i i • I! 11 — 1 s( -.— Y e�: I d PARKING GARAGE SUSS a NYIISAY.INC. w „ 1 y: pl)'_! LINCOLN LANE . WEST "•" - 1_ ^..." 41 i` ; CITY OF MIAMI BEACH,FLORIDA c,�,c ....•• •-•.••.",. �• 1 CONIAACI N..co. 6S •.y..- ..........,.. • t --I _ y —_-- _ —is d i _ i I' - i • • �_ ±z :: ==-1:1 - - —_sut-t___ -L.---=-"7:--z-_-_,=_..:77_..=--_.. -_-__;7+ a-� r i z-- --- ------ ;-.--'1—!-=-- -,-- ---___ _ - • E _ _-----JY-- _— 'It r_ __----iL—_--- J —..—. _--'' 'I --n. •Ii- - _ _— Tom— _ '. _'' Ii ��1 w7.= ' 1! • —fir !! _ 1 _- --- ..---=-a1---- -- —__ .--. — ....—_7--- . 'IFF— arwr s . i ! •' 1 41W a[s _F --- --- —sem' —r.--- =s'a__-- — ,if:: • Q 3 . 1>r * % YI iiirrr .I• 3 . i—i- S=9 lS.0 i t - ....NO- FIN 'PI•N .- Pn RT i — ...0 ,n•r_• I--•i' ""•' "' ..y is (OI 1., I.; (,) (.; , , i 1 I • 1" 1 .1. �I .�, I e+ I i _-II-_ „L: : �il- SII _-_I;; __-��-__ -i ? . ' D n ; f II _�__- , H 1 1 I I ,I �4 fib..- blr-�' . I t' ill � ' it I 1.1 II II i 1 . I , I' I!I!, I j 1 I I 14 I 1 1 I'i p! — A ; R .1 I I I 1'1 I i,�. ��; � � II'' r 'I I Sill . P� i ii I II II II • 11 =r III II .I r 1.1 �1 1.1 III II 11 11 it • • It ;I I IIS. III , r I I Ir p� • III i'I fr Ili: ; II II'II 1 III !.,1 ....-. ...,./1111_...i..,/il.r_ ,,roli.i il.1 .. riii-_ Ill 1., , _ I _hi., _l_... _ 14.1,4_I I'1' ! $: 1 �I t 11 i el I'6 �?- I I 11 I I I'I' I 'Ili: III 0 ila;�y. Ia���_.11,aa_ fl '... a_ I i LIQ . e. I, 1'14 .A. I, i-'.;a:. 11 I I _w- 1' _^.. _w liq.. . 1�_ I • I I 1 h..,., 1• I IR 1 11� II II I " I 1. I:1- 11 1 1.r..,a,.r-11. 1 I �. 11'. 2 I C1.6 Mt • II1 ,-.41 Ir I.� I� Ir 'ir r �I .- y I 1 -h i I II ;I I I 'I 1 i I I I.. I" I, 11I;l 1 .1 IJ� -.ee .y. 1;1 l ,I I'1 II I .. .I I 1 , I I' f R1— ; I u 11 0I I I 11, 1•I ; i 1 11 1 X-.- -III E 1I,1,,.... ' , II I 11\ 11 ` 11 III Ii II 1: e� II II ; I' I • 1 '31 1 'I 1 I I,I +I' Li I I :11 I 1I_ 1r•^•ow 6r,svael.l► '.. 1.F'1 v,v `e-neee; h i1; ;I1 I I, 11r i . a I,I , 1 II .�., 1! ,; I 1114. .arr .r I ly .s ,, `�; r .1 •.�r III ...Ir,. 1• rear I'I "° II:1. I I� 1 ,,. I! ••• -I V l 11 11 .1 '., 11 III I 1 1 III I, I 1. 11 - 11 --t, M W _ I• . s J L_.__.� • Tr it , W M- --I -- 1 1. r,:;;` li : ; : I l I �� , < ,__ + i I I I "--1-'— • '(,): 1 a PARKING GARAGE SUSS f NYITRAY•INC. I , `/NNNIIM4,e r4U •• f �i--- LINCOLN LANE • WEST »�. ..aa.r..r.,r,w,......r•. ;:::..:::.:"• — . F�� CITY OF MIAMI REACH.FLORIDA �+ • t CONTRACT N..PA-el a.rr u..=ru.a.r..aa.,. +r•aN,140••••...•rwru K • C '— wo r N • N''J, i rs _ • a. /41W it i..fr.a•fi i J 1i.1.a'L:ie»...w.• ,r... ,•/..Z4, / ....L.L.2,.aY (a!• I IGLU_--- —10 eu '^ • —..�y�.Yl r r si tea---fid-- ! --1•s d 1 y f ...ra i I 7----1---FT_.. ... --_-- - - _ '- - 1 r. 6. i _... ---- 1 rmr y..,. i z 1 u . ' .. ----- ---- .- a+ , 77157- -- ::LL 1I -L N # ! I 1i . - • _ • 42 Z 11 L I I I t 4 . I _ • W u _ • ,..,.....A.„-__ aN. Ire • Ij .i • it u • c�•r._-----_- •_- --_ ^- - . ---___ ------ ".;•''''"f-uwe A --- ___.5.—// c IS _ _ Jr•V ff�_ i-..r�— `S.of T►14RC; FLOOR FR•MINO' /LAN •— .ART 01.141.1 .41',•.>-✓T --!1'. •VI r. .,a•. :-2-'-''--"797...T—'""•-• i. • 4T _ <a9 (1) /, i , a 1 ' � i l a a ,r:." I _IIID 11 i III ILII I 1? �.r;.•. JAN • u',.:Y:�. ' .q!....I t—., 111 I 1, I 1 (hi— -t------t- j •.:.,;-, Ii II II III IiI ill " . y/t'1 :I I I I� III l,l 11:": o • j¢ ! /�� 11 Irl, I M ' I. P I 1111 I I ! . .�F I I I '1• h Ii • 1 L• I I� �_ I i 1 I! :—/-!( — -- — �1 Ir• R II I. I ' ' 1 _ IIP ISI ISI .I II� �, I. r ,, I , III ! PI I. o `-r// 1'. II A,.. ...J•L. �•' it I }y' II 1 1' II I I / %/. i�---I I jj I'1 I9I ;; II I II IIII IIJ I II.(/ 11 I r1II II' Z '' I Ii i j1 1 i1 �a� -_, I I II I I,I I I 1 1 .�. II 1 11 II I I///4'. I i i i II I I I1' I I I l II Z�y .t .r" _ I I I I I h lie..w.,. 1.• I I . . 11 _:-Iii-- it r. r s k i r: i ., I� Ill I III— ' I` Li Ii i� I" 1k = in I4 i I. ,, 1 I'1 II I. 1 II IIr ta ! I I I I•) I I I I ,I { PP all I ! III I I'I ! I1 II1M 0,. _II{_J1— I y II! I I i'Iii+�• is it Iill SI 1 I J —mea i III II I i I I I I I i I fl N y I i I I I I I I' ,.,p , Its I. �:�, _ _,�, y II I.I+ fr ,I 1II I~R ..w." I I ... _ �.. Ii ._ t:'.`.�Il .. . I .... .I.I II ... .. 1 I II11 ) Iq° I I Ill'^'od,l. '.N°°' I'1_ I 1.1 1 •I II IT l` _ ► 4111 I.I...- 1, t.,.r I-I a'. •1 i'•1 , I 1 I III ! iti IsI /I" u.r i I •II�. 1 I IiI I1I I' '�' 1 II. - IIr.I .---' .I. I I I III' 11 .. I I'� II I I I (n: -. -�_-iy-__J Lw:, I 1 IuII I 1 {ITTI 4*- .ta&-s'.- , I I ! I 'S u�- — .IeITII T—;-IL It— It MLH— II I f , i� _II -II 13 Y w r S __ — • ��Z ! ISI I I I —p - ` _(-0: I d PARKING GARAGE SUSI r ernur.INC. 7 ✓<Ki: LINCOLN ••-••••••:.:".:.,.�•;...., • .�..•,........ �....o...... 'v i-- LANE • WEST ` i i� .I /CITY OF MIAMI BEACH FLORIDA - ItIt t . .. CONINn'f N..PA.- p ow.....4...�•...INC . NY..a.Y41M..•NYL.K i,..,.._. „ , ,,, ... . (0.:- 00-::-:.-_-_---J I------,-1, Id - - m - 10 - 1 , u. -I ------ I I I il I I I I I I, I II I I: IIIII III 1!I 1 I I I jil I Ipi illi II 1 1 1 II iil , II li 11 1, 11!II II II III lil 11 11 1 it il 11 c 11 ii I II 1 1 11 • ii ,„, 11„, .., . ii .. Iii 1; 0 ‘ II 1 k. . 1. —IL,e 1 Ir .1. 1.. . 1J_ . 1,-, 1 I:k 4 il. I11,' 1 C I . I I 11 11Ij III I \ I r • 4' It I , .1 'ir 1.11 III I'l i 1! It .1 .1 II 0 I I I li 111-111 II 1.1 III 11 'I I ill • :I I li 1 I ji I.1 2 r _. ;II --:I- - -li •co.s. . l _....,._ 2 ,1,, , _.„,„,_ , . . _ . _ . Ak.. •,- -7.-- 1 III - - • . -- - 11 pi I I i I A I I 2,1 I I 1 I 11111‘ 111 11 I . La 11 .I •• '.. I Ai. li 111 CI III 11 ' i . t• '1 - I I. 1:11 1'I z I 1 I III I 1 I 1 1 1 I I I i I,:1 it iii II I I o . Ill 1 1 d I I II .1 '. ill.,11 1:4., ..., 1.4:-..-,,,,,I, ,,,'„,1 1,1.,........ I1,,,,,,---11. FL - -1.1. I ; , II ,F 1 1 ti .i 1i t II: . • 11,124 : I:. 1- I. 1:7 1 t \ .iii; , d l- it- 11:14. I I I r . 1 II" ' 7'i - r i'- -1, , , • . -, , - ,ill- 1,, ., - 1, , , i II 11 II 1, i , 1, , ),..,_. ._-t,. 1III 11 i_fli,.. !,,,, i.i !....,_ 1,----. -....1--_, '.-- - - --,,,--„, 1 ,, j!, i,;.,, 1 . , _ 1 . I...:. 1.1 ii . of -' -11;14;'a..r.• , ....0 LI ..r. Id ,t.r il ..., LI .,... IIII ,...,- Ii .., 1;1 ' 11 I1 1 I I II 1li ' II ' IIIL 1.1 illi ! IL Il I 6 t 1 I. 1 . I 1 i 11 1 li I ; 1 1:, r" ' ).'!,-.t 1 • _ 1 11 lil ii 1 11 - I lil _1', 11 ,t , iii • 1! • I' II u 1 v--0--- -.• :• -- . v A--o- 4 , . i l' ft 1', 11 - III ...,i0r- - . • -: : :--: 1,L___- ,i_z__ ,t_ :- , .pc it.. —.• _.;1.- -1- , (0, i . ••• : X ••T 1 '1' -- 1 'T 1 •ar` , ii liTri () .11, i) .; I 'II. CO I 14. [ f A. i a I I.I 1 . i .: • i . . . 4. -I _. I ._11-1 . ..1 . •1 , _ . II . II . .1 f ') l_ .,. ..,. ; . ki PARKING GARAGE 111.161 1 NYITIAY.INC. g. 1.MO 111.014.61110 ••••••••,•...•••• LINCOLN LANE • WEST --------",-- ,, , • ;:i 1 CITY OlFctttitilliA.C,I1,-,F,LORIDA ..-.'•'. ''.. 1 . ,•,, ,. —--- ---- -------- .- . . , "..'"""...^ • . _ .. ._-- • , ). 5) (•i CO O (.) l:) (•, N (-) NIiiti I'I ''' II Ea C �II'' r 1 i t I e!'i . . ' "I L li II II II 1 i I II • • i'1 1 I I II, I R I i I 1 t, * I I= I 1 II Lr — R ' !I ' a 'I 11 M n ii 11 I. 1.1 ;�I I 1' 1 11 it I I I'I I,I. 11 I I Ii 1 III �� I`, i I I [ �w a +� . , 1�. + ,k t -fL t Ii I 1� _, .. I 1., ft rI -;- - -IIA' I• I- A'- 1 1 y- II .0... i I' I I. y� --II II' 1 I IIL.-•----).1-1. _. 1.1 I 1 ..+. 11,•r 4 -I It I Ir 1 w I G' ..I 0.11.":" y 1 I. -I ; II 1II 1 II , II 1 ii : 1 , I I I II '.ji I i.. } I I1 II II III II 11 1I1 I 1'I I I I. , I . I I 11 Iii i 1 it I II I; • II 11 11 11 I'1 I! I I I I I • 11 - I I: ' '1`... .N i LI I ... �I. .".":- .+- i ; I t11 .1 1 II'i -�11 I lj !I Il li ,4111 II I, LI I 1I II I1'1i • 5 :II I II II III 11 II �I� I ; 4 I ! I I II II N i i ,I,. rrwr t► �.....ro ywr I IT I w 71 Ii I1 I. .F HI InIrI• . It ..,1. it r.... "'I r..+ I I ,..r 1,1 ' Ili r!1 I I i , i 'I 1 I I «-. II r I i „ I1 j1 1 ,. i I I'it, `� I 1_ iil I I I I I 11 II uLI fi —. i-- —4 __ L I 1 _ 1 I.. ._ I I,,.,«, lr-4)w. t I I rIli II 1 I ,I; - -- r'.,. ' t ; 1 :Y. • N z • (I l I __-- F of , : i i i PARKING GARAGE • BLISS I.NYIISAY.INC. r .r,r r .r........ ,..r.. cor•u010.0.r 3 , LINCOLN LANE • WEST .,................. _; ;1 I CITY OF MIAMI REACH.FLORIDA 1Y .. . CONr.ACT N..IA.•f «,..rc. ' ' ............. .... i. . . f 1.. 11111 - 1:1._..:_ 1 ii11_2__Iii . ill---t--T-----(141;-....19--- - - iri 1. II �f I I I 1i ri I •I I. I� 1I F � Q• ' , . 1I li II ; II S' I) .11 4 , �. 1(1. I. k o,,�1 I ,-...w l I,_• N I I I I I I I; ) I I U. ,I`� .` y If .I II • j1. I. � I I i, I.r A l !I II I I. I 11 i i ICI I .I ' 'I ! I1 1• I II . II r! �1 !I =— I —�I I �i • ii . , A I, • iI I ., % i 11 I. I 1 DI p I I II 1' • ,�jl i K • �I I. I I • I I e I • IA I. 01 I II I� I II II 1 V. " II it . I' I ,I LI , f. z I • •r is IL ; 141k I6."''""II.'_"`°''I :I Ir: I , l 0 . it II I I • I I i I 11%3'. Gui. •• E° '(VT. -4,4* . .. • .__,[4. ( .V t1• I ! 1 I ji ,R:_ _ _ • III I> I I I I' I 1 I •I.1 I 1 II 11 I.1 ,I,4„ I I II 1,1 1.1 .... ,.:.. II • • • is I I 1.1 Nr _ ._frr._ _ i.�.-.I`!_1.1 f{�/ AV' I} .;.u.i Lit p1I '.I I III II t3i.ir�. 11` FI }I II l' IL I:. ,, 71 Z i' r li i I I{ ,T e I I ! 11. I I ',• .I 1 I I 11 I I I •I L41L 1 I• ii 1I +*.. --_.�—___ ' .._ _-JCC__ `) 1 1 I gill-I 6i 4:2> i 1 1 • 1 l .111 I I1 b / 1 • ; f.) rp'. ,) '1 6.• (-) _ q R . rit1 1 —� _41__ T 411 ki iiii e !�: 1 ti PARKING GARAGE nisi I NYIn.Y,INC. .0..... GI....'4...pq.... • `� — LINCOLN LANE WEST "• --'•'-'•'•--"—' .._,1 1 CITY OF MIAMI BEACH•FLORIDA ...,.....,,,,a,,, -"4....se .....r.c K ' . CONTRACT NA.A-.. ' w, ""' . ,. �" ("-) ( ) (1I� �T/ ) (I y4(�. (a, lii (e IF 14 14 ; • I 7 . � i I .. 1 (,) .. _ _ ,._.. .-_. I -..Ir.. -T. •; ,:A x_.11 - -- . _--'I , 1 1 . I ", ' III ! :4 !I I ii[rill 2• 1,. I �, I, I g�a—�rxk► .rat'. -riar• I;II II. �� "_. 1 I � I. I 1 0 3 i /P," I 111 III I! I III I:I N i 'r i / I I '} II I II I // I'I �I 11 I I I 1. r .; ) 1)1i ;1 I1 ''Cit - ' Lat ' il I 1• I ' 11`kII,I I) I I/ II j;I tl i 1, I I ' I'1 I I `� ii yJ/ 1 I I I 1;1 •• 1. ', , 1 1' 1.1 I z�� -- r. I 1 i 11� €I: y I: l k„ I L 1 wr 1:1- 1. I•I`I 1;1 I I. I I i 1` r I ;. 1 1IIi I:1 1 .1 1 ►I I ' II 1 = ' 1.1! ' j I I 1 I 1 �.1 I j I,II II 1111 11 1 1II • Cn?.. . ac _I,ar_. c_ . jj I *z1i1I E• ' I M $ LL.JL- ,11 r I -t- I ,, 11 I,I I —1 f 'I.L.. 11 I II 1 1 I 1.1 II 1 ' 14. \ILII '6 11 1a'. Ijl �jly II- II .—''I -se ! -"'• I .h- HIII'-�,_ , y_ ,.— 1:1- 1- - III II II I +• (� I 1,1 ; E 1FI I ,• , II.� R 1! _ 'Ir•kr....1' II i1 III l ': 11 I. r•.1'1'- •••r- 1 r v I, xi• _II I I` v II I• I '� I C I I� 1' • 11Iw:. : . I , li � 11 II I 'I "III id r !a1'�' ' .xv ( ..•: I: ••`r 11 tor ' uv II ,^'i�. 1 L �. 1 I I� � -• i�� �I'I IL* i �1 ' ' I' I �' I ; fi4711 •{ • 11I — 1 I. II ll 1. . II �ITiI Ili Iii .rt 1 - �� /I. 1 • > -�.—4 r: 1 1 !III�I 4 ` — i� : al PARKING GARAGE suss a NrvnAT.INc. »o... Al cNrr.a Ac:oo..rr I .j' „� , ' 6.0•11.1.4 Om. rn " s� LINCOLN LANE • WEST -"‘-"^"•---. .w.. I i0.t CITY OF MIAMI BEACH,FLORIDA ..«c r--^"•"•••••••NY••_••"•-K Y - .r!I 41 CONTRACT N..PA.►a .«ter w»wu.««.:...u.;. . •••• "•• i i' • i. __t : 111.-----� lpil viii ..:-.--.4 . I III__ • I! ! ' -I f r - I l , ,011 -�ir- II .I i.I III 1: : I1 fl —rr , —rt' t II ,, 1:1 ! I'I iii , I;I I 1.1 \1 I I • I I I! f; I I) I •I I':f I1 I I II L f I 1 ('I i'I I ' �` ,I IIF r• y it I h I: !! I ILi 2 - • I I'l I I ;I i Ti r Li 2. I f.I ;; I, i) �i 1 I! II I II I ' II I 'I ' II ; • 1 f l I 1 ! I I i 7,4 Ali' I I ;1 1 II 'f ; Iti III I II III l Z 11 I II i. w 1 1•I �1 11 I. I I,I 1 I • • ._.. ;, If I I I I f j 1;. UP.1 I ; .1, .,i o 0? I I' _ Iii, I i I I r �•r„. !, II• I 1 . ' I• ' ` II- 1 i ` 1 I -••- «. I •• I ... II I (j._ . : s:a J' • / '11: s •'••,'II r 1 I II III e b— .; i I• I 1 1 . ..1 �... y� G Eli , i I Ia I' I; - I:I 11 • f I +✓ 14 •I, .,i 1I II • II 1 IA .:I. N:.'t .1 I4�_I . � I I I , ►I lir $rR.__.1 ,I ( ._.... i I�1 l I. . �.J .It .. ; 44:. 1.I I ,.. ;il I;I III I III I II I' , ll i P IL. I;i IIF I.I. Hi i F Iw k I IIs 1 -it • I I I I Ii it ' til = f Il II I� I.I 1 1,, :1 ii iii "'y Ipi I I ''` i�R I.1 — 11., 141-- isii,.._11,-,.-. li 11 • — ' — J:L------ __ . .. ... I ta ��1 & I ...I I ...,I • 1 1 • I I I MITI 09 ,�. (I. c•) (iv 0) k /a, t • ill I I.I I / = -- ; 1 R. zvai call 11- -AI-�V- =t; I�_ 1� PARKING GARAGE IU •NnrIAI.INC. • l€ we•.� LINCOLN LANE • WEST .... ..:'....".:......... ..._........... j}� CITY Of MIAMI'EACH,FLORIDA • :f0.4 t I • •FONNIIAlCI N..►A.µ �•" '"• ) (61 • (.; C•; (•) (6)ti_b i (•) t•, I ( ) 1 (.; 1 ` ' .1 .....1, 1 - ..I 1 . l. 1'}I ' --f::_.._.'II} 14 .I,1._" _-1;t I• . .1,$ '1_' l ':' I1! I,; 1� r•1 III #;i 1 I i'1 i ' OR, I' I ll, I'j l:� 1..1 j1I I I 1 j I I t +I) II „ It 1 I` Iil I I I I II l a I I i!1 I•I 1 1I I I _`. —• I1:I I 11.1:I. 11:1 I I. 'I• Ii III, I I ° I 1 I I •JM} �:� t- - ' -. I. /I II 11 l+ N I I• 1 , 111` 1114• 61, I II,I Ij } i.i II I - Il J 11 1I 1, i t I, 1 I'll I •I I I III. I I H 11 4, ,1 I I . I-) I I I I I I I go, I 11.1 I'1 1' [11 I 1'' II I 11 1 li I I I 1; F 1 ;;I ; I' I I a I I. II ..ads I I I_, .]I1_ ; I I 11 _ �_t.- ' 11 SII: 1� 11 1.1 �I _ lfo. .: �r° � , It II I1 ' II+ � II ,i ii. ; �. 4 Ilggilt;j - -�;� ,� I !;� II j..r I' �I' ..fir. ,II ., -z I : 1I I III II t !: ;I. ..� I +_r ,I�.p -' , _i . .�H;. .+. I " 4_ I�• .H. II .a . I- II. z I 1 -'I . 1 i. ( I I I I I I. '4'. I I i..' - (11V I� I_ I,� II ' 1 11 II. II I ' L, . I w I , I,Iv�...oa.,Ir•..r k 1 I Iw I : J I fi i[I }' }� I II I I i II I II1 HI \\\ : II I II ;I } i r II I II • 1 ,1 .- \ 1 11 I I, }1 I1 I1 ' I Iiii! I1 I1 L 1.I ' t�rLL {--' t�i sr i.L..\ , ... I. 1h----- I t I,Iirr.r-7 1. ... _w .�.#,u,- ;9, \ I'1 11 1! `t ,hi .. i 1 'i I I 1 1.I 1 I I I I -}.l:-+:ro' I 1 I r.;I II I :1 I' II y I I I, I: IIII 11 'p. I I Iv.. I it 1'1:1 = i I }�wLIIII: 4 ; I :I 1'I 11 . i[ 1.1 4,14, . v II I. j .� 1 . 1.1 •, I1 lit_i 1 1 .1I - II 1 I�_:=_fI . 1 -- • -- - - - I• 1 . F I1 L. __ • : III PARKING GARAGE MSF S MYIFSAY.INC. .o..... Gu,..•...un•,.. 41 s . LINCOLN LANE WEST •-•—•"------- 1; •'OD i f- , CITY OF MIAMI BEACHFLORIDA ..•..• ..•.w .. •u .c I } r +1 . CON1xnCI N. ,..4..... ;;;';'.'',..e...u.... ......u..• ....' ,,..... .... 1 t rte,.c__ . ...._. "__. _.::._ ..". " -- --- A. 4. .. -I�1�I .Ir. - s lYrr NY F ONIWViW .10011 - - - M zx :! T - —rr------ '• I • 1 .r r j - z .- • I I --- > Z i I ' 4 -i .j� ' Z __ .� I_. �.:__ •- ------ - ------_. -- I , ----- • >2I. m > I c 1• D I 1 • t, -- -- ----- • --- I h A m m -Q` -R, R rar C, ..) to V '%•• i c' :Kiri i 1 !' = ;14 y •fir ._ J.w ` , R J,,r :R .. I w _ .1.-IS ' w z 1 AMY." •' , . .= • �Ir • • 1 .1, r .y .r,r .,, t_ _ : s .----- -� .—.__..._... .. .. _.. a .••r a. - k i i H mro,• : P. • 1 ,J 4 i y .v 1 IN i •. --��� �— I J ._.If-__ • i $ ...r MIMI •wala «ia u:r Cr _ =�i 1� l. M .l ' ' .1` 3 .• -- ---- -- T— N • ' v. lid , ,____i________....}' -_ - - �# to yHj MPJ . — \--yWL---I L= —_--..._r. 0,1......„__ a I � O • � • I' 4I s t � :! QIuW • \' 7�—_------____Y1____ L i _____ __-----1 !_ Q-S d Com\,cr. .--- -JJ--- ---. --_--1-4-----,in — a 1et i Y f o • 11'-- -- • _ .. _ ...._ -- _... ....._ \�4T_�S= - __ —._ —..---- 1+ _ ... 'We NW .r.r .:r+r1:w: i, .. �� — - I 50 'ROO• '•RAMI NO •Pl.ANI •ART Z — I.,.. - ' _ _. 1 . ,. . . : . • • ill '11- _r, -(-!!)---•.• ''.'i t•.t:._-_ -_,..,-.-f; -_.:-:....zi 1_--_:_---_-_:-..til ..... II ir 1 -1., li Il ,. 1 1111 1, 1 1 1 I 1 11 1:1 'II 11, . [..1 I': 1, ii 0 V!' I .........11..t.--- r. .1 l!I 111 H -1 - H i!1 .1.1 .1 1 1 • . i. 4 1 ,1 •1,411 f i ; I,I I 1 11 111 III II: ,,, ,, 1' :1 I I' , - • , ll l'i III 1, it if . 1 ix iii. t li: .1 i,c iii, lit. 1.1 . 1111 Ili, , i, 1 lir i..L r \ r : I 1.1 H ' ill iii n I fil 11,1 II4-;t 11 111 . :.12,t h 1 il ii 1. II pi •• II, . 11 1,11 1, • II , zi ill I, 111.1 fr. • 11 1, 1i . 1, \ 1 1 1.1 • 1 1 1 1 i. iii ' I 'II il 11 ; -I 'I 'I iii 1 j HI -. \1,I 1 II ;0d, '0.,1 I_...A. i 1.1 ' ' ..:,,,;,,,i,......._____:_,..___..._ ........,_r__.i..1 .... i, _I-1 , I,L2.-..... _y!._.;I,. . .I tea;).- .;.• 1•44,.ii-•, •',-',:.*1,1 r..,ai k--7-"'."--"-""r".',I), I : - 1 ' 7.-'— '— ,..., lc •••.or 11 " ir '•-:', • : it ._ _ .. 1.1 i 11 II II I I. . _. I ,,, , I j. li: !I ,...1 fl 1.11 III 1 e • ., ,. . , , .. I I I I ' r .. :.,, ,1 • •z . ,,, 1 if I 1.1 , 1:1 -1 - tili r I • I, . .• ,, „:,4-,., ,,..- ,•,1 ,., ,1 , 1 ,;:, ,,. . r., i• I ,.. III , II if .,, ., .. A f I ' i. .I r .111...41 t I 1 II ,b• : • OR k - 4 _ 1:;•..0,Par +UV...1641 -- 1.1 .11 • 1, r I 11 I i.,; ` s ir!iii: .14 I:k R II . ., iIi .: I• • . 11: L 1 I' "Li' I • lir ,,.• . 1 , ,.,:.: i: 13: , f,- — ...-- T. b:. I:I- J. iii. , il ,,. -ii: ‘ - it i :I I 1 • I ri .1 1111 1 1 11 • 11, A l'i _. 1.1 II Ir • I I 1 ..1, .• I'l 7, III -4 ••-4 -.•- Il "- I ...- I. .•713 I il 4-.11. I i 43I,I2-I I -..-- I.' -4.• l'' ..•- 11 I. 111 . l' '4'..I. •. I 1 1._ II I.I i' I' i:i 111 II, . i. 1:1 , 11] Ilti: ,- -.1.1 -..- 1+-... i t If. ii . .,i. • ll 1., . 11 HI :li 'Hi" 4— [I P .• 1 il 1 1 1. i 0—. . I -- I;, . it•N' : • I , I ill i i • •• • • ,,,1 1 ,....... „,i t ,,,.., i i i---' • II- , • _ - . III It Ii. III It ' I 1 I'tot-,_ 11.._. , f ._. SW CI m'r I. .... i: ,.'4' :I •IJ I: .... 1 I 11 •.; • ; ri . 1 1 11 '' II; 1.1 lit .: I • , lli I il l•:II.. it :II III . I I I 1 , ili I 11 II! .1 If S 3 I L I t pr , .1,,, II! ,,i h.'. i ,, :1 1.1- 0 Ir 1... ..t, ii 11 i VI t;',,::•-• .k----- 31 1 . l• .i.,-':-.1 i'--;•:. 111._Ise' lf .... If 1 1:1 xi ,.1 I') h 1.1 III •1 ,. ii. . alum . ..10...r . • 11 1 i 1 i 1 ' 1 . i 1 .1 . v•I !I i , • ; .. ,0 ., •:.,.. III , 41 I. ., 'I 1 I .1 24 I I , li I III! ll I • . .1)- -! -''' '`! '- I tI 1 I I 7.___ .,..41 .\.x , . • i ___IIi.S.Ii_. II.1 -lit Ilid -Jill Ili I: Ile - --'I -. --...E it. HA . 4 I ! '44 ! 014 I ••04; 1 ;.'...1 1 ' • . t. 1 i - : 1 1 j. 1 . I ._ 9 (1, (i) .... ki (a .ii. ta I s• c4: fig. I.) : I . 4--- ._.....• _wo,.._..--4.1-iik..'.--2 • P , 1- !41 _-:' :tcy) : I I PARKING GARAGE &L4 £NYITIAY.INC ....„....... .'^'.****......” i•z--- LINCOLN LANE • WEST -."-"••••••••••••-••••••••-- _ zi II ;II. .1 CITY OF MIAMI BEACH, FLORIDA „,„,, „„„„,„,,,,,, „„. arm,.•SI•eam•YAW...•A.A.AA ......AA"......Au.44•••• ',. i•• 1 p • CUNIPAP,Nu.PA PP .opu,••••••• P '. •. ..t•"... . ::. - s.. - ---- - • — • J _, ..,4-,..,• ...et -......-...,,.... '..:... _ _ . _ . Ti:: ,.0"Pi • • _ , ,. _--Er--..2k.•,•• . A:7:"I;,71.•-...Cf,__. , •r - , p..—•-t-- a .:', .. . ,....' ,.....H, . ,•..., • •+.•• t4 . I : i ----(' :."4 op i _ _,___1 . , -' ---.:,-, f's.VT„Ir.,;•,,,„ ClreArwi;?•';.•4044 ,----"Vi'•—1. :444..f.-..0.0allored• I .V.IL 44 .., -.,. '. •••• . —-..-,71 i ...nth . i g ' 1 ' : , A :, ;V 4 --•..= ft'LIZ___. $ i I ' el. 1*.•:xi, __51 • ,••••• _ ......_ • - .. • . ,..-, •:) ••: ••• '4.7 e.or s. .V •,, - "7,75'''''' ZI,.\.4•,i•V ix skt., 4r/ * ____ , •••,...,_ ' , = .870 • - ,i) • . i ,,,.' i .• ' I •— U...: • 1.1 i i i I .• 77 o. . , --- - - .'.. • : ..„......,- , _I, , .• • %., :•.. t, 71 ,.. ' 1—< . . • .. :,.... . , 1 14* - . .Jr' _ ' ...... '1.• . . 1. •*_,,, j._ _.i....vr_ . 0 a . , ul‘tai Ill . • • .1% 1. 1 '''' 4' 0 0 . . .: . ' ric • • •,„ if'• 4.•1 47'6 ..•• 14 4 . -• ' , •IVviV.I.V ' < v• ' ' , 1 , . • ' i r,. e.rk+a I - !; ... ._4,.... 1 .5.-. •••t!/217/ ;I Z. ••• . r 4.w..AV••••••• • %.,,.mi•••U :, ______, . . . .---.— 1 7.trii ! " , ... . - ..,.., , —..—..-. :.1112WIWI2B-. IX 0..•° 1 , . ii ,•-IP •-•"' .. .?' oltI,V.Mel Y. .V.1 , J VT) ...-.. . . ...1 1 1, . ..1. .......•,,,.. •. • ,...... ... =---. _. __ __ -- ......,r.,...t. " . --.• r . S-122 .=•,_ =_ OR S -1. A I Pt FRAMING PLANS ' • mot- .....,•..-cr 'A, c...,„,..... , • •0•.I.a•• -- •••••• • r Ca.55,5.55.6 .uflla.•o..r r —__, i ry srr..r.,as'r ala a.•s ro.0 - • ' ,/arr•fI +u rr I t-.., ( I • •.•ire• Ares,,.' ..)rre.••.�.�.. 1. • f• `` r.,l r.•rr "!.r'J 9Ji' ,400'S. .�s.r,,'nu 7.0 (- N•1.I•r•Ss alts•.. { - 'I.•asoJ (.I•fe'1Jf'0*1f O•fl.) ' } ify j • , ,I'.,• , • , • •e.�r w.�.o- .,.r ).• ..a� le[.1 TION ..... ti i.1 �V7 teal+ a..+.' .a..55..•••••••••• t I•I.,.rfwrwfl•••15...., )^ afro ' .eeav e 3 <; S, s:,•15••.• Y -rl..fo.rf +S.• •• t 1 V N . P o o r o• s L[vari ON Z. -; , 5,0=5" ._-- u — • t . ...5.•••••.•a it _(4m •,...1•,...15,,5•5,05.• ar . i . _ I.,Jr,•fele a.r _ _.. _.. _ j rain a _."Jrn.•rf{,x -; Lij W O 0 $. ' 11111191111 \ Z a a z IOU• ov • m Q Iw . tZa'i a C�(V. i ON O• • NS Z •a;0.1.•0.0•1.611... •-• tai Z •.,•1.;.•0® 11.11.'. ...I • ! -- IR:— �I I v..Q.;. _ . ' IL I I I Ir 91 .'. . 1 I ' L . 11 i I% , ry•1 �, I- I_. I I I I° 1 i • cs 11 j �' I -. I hL} , I• i 11: , I� I. ,\ j I_____ j —_ ik I o II I ' r. t I T I � CII I. j II a ill I. ;- - \ , 1 a I • i • 1 j • i . j I • 4 I! j i i • I` I i j TI ` II * ! j `I II . \ ,II I TiThfl 1 II • i I I 1 I i Ii I I I • 1 1 lIIi j I 1 I •II I r T'' 1 1 PARKING GARAGE ills#,wrnxwY. N; INC.r:' LINCOLN LANE WEST ......,,I,r#.«..,............ :...........,..... 9 1 -CITY OF MIAMI REACH•FLORIDA MANN• •.....,,...' •# COMMACT No.PA-4I ............C11. ... .....,........ I ' - •••••• • - - . ;.•.: • i'. . a, . 40- ,a . z:•• ,, :-.. . ,4' ,.. J.: . .14, .t,z t , • I '''' . ,•:%,„ .;• • I k -- 1 ••., • 4 r:, : !...4 -,.. - ,L-4 4• I , 1 -"a1011411-19'-...?.•-":'-' ' ..'- '''=" . • ' I ; • • '4 4 ! I, I; . , . 1 : I ..• IN - ,. . -'9r- — . - i?, - --- I : 1 I , - 4 %i 1 Z••••' ei • "9 I . . 9 • ' kiR •! • • ;,'it:., ' ; i zR1 • i •4,, I sik:4 t 1 14a:• ',. X i• .. ,i, !IILL-...., A. WA . ,r, •••,• 4-777- - 7—'r...7=.7—.----il -.-.: ' --/ • .- 1.,,.4- • . • .I! I„, . ,•• I,.i• L 1 ' 4 T' 41 • illi- IT:• i',▪'... i li .. ''2 I ,.• I ',.';:i: I i - • 4 • • i •., :. ' r , . , .. .„ . , . :1 . 1 : 1 , . I, i i t 11 i . 1 , . . ; ' 1 1 . , I ' . • . , - IL- • ; •. . , ! i . • I , , ; - i . [ , ! 1 ! . ..-. . - ... il 4,0' 4:- •Ita. a II Tt2 i ' 1, il . , •0 1 I I 4 Z 4 11 i -I .F. .. it'...:r.... '1 PARKING GARAGE 11.1111 II NYITIWY.aINC Ciaiaitliodu ataiialss 1,..)••••••d a ...1.44•aauciaa• LINCOLN LANE • WEST ------- - t ui p I I CITY OF MIAMI BEACH,FLORIDA „„.„0„,,„„,„,„,„,,,,, ,„, ,••••••••••441...•........Nou:.dikt. • CONTRACT No.IA-III -. . ' -- kk ,... 1,1 s:s. 1 ./.4 , .se ;.i, s•• , s, : ,a ,f; i a• i I. .(— f 411..1: 1 it I!I.. 1 I ,Dt% - a allbesn-.,.4,.; ,..=....i..- . . ,. 1,1 it.t 1! "*. t t ir------ 11 ---- :I '4: 4,41:. .Z.t.• irj11, 11• !•,t , lb 4 . - , • 1.'3 1 ,_. 1 / - ”.. - - • li .., (1.4._ • i 1 t i b• 1 i. s •, 1 I :, •1 il ;-. - ' 1 • . i I • . . 4 4 16.6 iii I 1 ... 11106 1146. 1 a rt I4.. , 1 1 11 si INI 1, — 1 1 • 4 i 4 • . br.I il •' ' ' S . ! .7.• 1 c a ii 11 • 4,, (;_ 1 . . 1 — . t• 1' i . .. t. t I 0 k . 1 ! ' 1 -.1..N.- ' I - l i 1 r : fr7,4,4 , iir i t , - , • . • . ,•,• / t. : , I 1 ;II; i' 1 ,, I ', '4 * .- 1 ..,:.', - , a ; i , . , : *• px=mati c--.;,. •,,. a 1 I I . ti • , • iri ii 0 t k ' . .• . • I • 1 I i ! I 1 ---. ! -z-:-:.. ! MO i• ; ---- - - /g !,. , 1.1 14 .7, .. - I r a _. . . t : 1 1 : : Tr i :ti 1 .171 11 I 1 L.,-- -4-...14,,,,,. .-- ......, ! i f 1 ,.....„..,_. . _ . . r.r 1 ••.• ..4 • • i t ; Z, I ,i • ! I 1 c .• i 1. • ' • 1 t ! 't t ! D _ -I t .ri'l - --- 1 -,- ' l'H' • •. - - ii— . 1 , !If ME . ' I ';:i ,) i 4 • 9 : ..# .,• . - I ID i 1 E--- ...._ 7 • I•i •i '' • i ' 1 4 ! I I I ! i 1 .,,e. ... t4, '•'•• . , .... , ' • V. 't 4/ I I. • i . ;. , • ti I • . •1 i .. . 9 i • '' % • • 4 „,.....„.., • . di . . ; .,... .. ' HD . ,P• 4 I I 4 . . ..-..- ' — 44 if ;I t(nE I ! PARKING GARAGE NINTRAT.INC. C0.4111110 Mel 4 . 010.f./.11.AS GM..•.../...0.0.146 IIK,I 1 1 LINCOLN LANE • WEST .. ? : gti 'lle . CITY OF MIAMI REACH,FLORIDA ...„....„m.„.v.„.. CONTRACT N..PA-el ' — Y r1 - It f�( :_. • • „ ,• {: r, ,...•,,,,,9 ee 111 VIII .I I r II - I 1 J -__.! - ___ 1 �”-- --- Ir,. I11. i)« , F ",i \ r , '11-1 \ 41\\ til �, 1 7 I I I ' dill I i,11 i ..: t(II' ,iK;d��. 1I111 111. =_I l L`_1__ip .�li.1, i • �.��� I' fdjMIIS ., �f 11 / I • ' 1 F �j' F a =k //! „".,p. -. e r V1t F.1. 14 w , y - ! k - _--- i 1 -\ ,-/ _ ip -, • __ 1I R II I,I ...I. • 11111. . _ '� 1 ' ' I l/1 �� 11111! • , i a ,, _ 11 1I Ij1111 •i e I ! �r '7,1r`'.- . �A*AM 1. ! 1 I 4' L :$ 1! x I aj = j j ` `Y4 , 1 j �i1111. i : ;o'a 1 ri P. Ili .I. fili I ii 1 IIIIII ,: Rr): 1 I PARKING GARAGE Rl1RR R NTIIRAY.INC. .p,.., ,•, EtV--1---.1 RLINCOLN LANE • WEST »...�.:•::a.•••.••1,4 " •. •. . ................��..L. s's,..;;i- CITY OF MIAMI REACH,FLORIDA � - ,......•u•.o.1..wL.a,wr,� ' f II . CONTRACT No.PA-el . � ...o..... ...•.............,.�. ' ... .. . • y&kx:. ' • I li — ►, - • — al - -� t r-• - _- _. -� = ..JL- _ . z •••LI —. ......„ ----.;:„. i 1..(4\V-. .....,,. . 1.,,\_'-----.\-—...7,..7, 1-\‘', :. •\----—1 . k 1 ; _• ____:__12 _BBI 1. ...F 1,_, _1 �_ _- { r go II 1- 1 r Ii oI -� 1 1 i 1V 0 I — Z x.11.__fiBL I. ww ` .P.I I.. 00� I �:i;I • I'_ • I I x 1 rh.74}' ___. 1 i1'11 1 MI (;. 1 1 I I I 7!i I II I pM I I A- '-... 11 1.—!.—_ I I L' 'I I 1 —! 1 I• y,i I, I I I I _______r_._, I I t. I•, .�C -�L 1 L _ I I. • I II .• I I 1'•., 4 11 I I l .-- I. 'y •I- 1I 1' 1..{ II '--1--__., _ -.-•T. I I ♦ I1.._ 11 , 11 i >� .— illi- F, I•, 1 I I 14 My •i= II 4 1/Y I Pti I I I 1 !1 a 1 r z i i� 1 i —�1-—_. ------T _.1 1 II II 11 J I 1 z L_I- I I I = i= —711 I 'v.-- _ /I I I I I 11`J 1:1 I 11 1 1 1 I f I.I I III Ur 1 1 1 1; I I —1 1 r- Y •_ LL j :::: • of, .rll• I _ro-f•.. 1.1,' I.y.ICYBXQC_rf:f• I T ..4,4• r_ . 1 . , �gg itji g ! " T-,-'): 1 I PARKING GARAGE BUSS I NYITIAT,INC. roarwN r •a,aa a 0.661.4/4111,ay • C y owOusNwu .u�we.as I(\y3 • Y LINCOLN LANE • WEST ""s•••••"•••••"•••"'""'". .,..,.......,..... W:•r 1 CITY OF MIAMI BEACH, FLORIDA awry<wwwuir••••• ,, ,rc mom•""�'•"""'"I'•AM.w i CONIRACI N. PA401I u•y.a..u.ir...._.....•,.., .,.....u.••. �••• ...%i V _. %1 IZI 1 '... ' s a• • II ..: .... k I 1 I' 4 •a,• moo •• . i . ......3 I 6. I a . • I ' • . • ,,, / . ii, • 9 , ' t•• -.41 ' _ 2 . A . A • A . . .... ' 44 . [ _ • !it! • i •. __ii-; .. k' ., . 1.::. : , ,. L. I.:, imi I., n -- k' .. r -..••11•6/01,11 P1101 *-j...---.alINNII - t t 1 ..• i ' 'Vi: i . , '! i ' • t . ., 1 • t: iiV i.. I 1 e li t 1 I 4 . z 4•1 : ' ilki • 1 i• ... 4 i , .r I - 11 -I • lib r•1111011.= 1 .4 . 'I.:a--•. 0,1 f--! ...- .1 :..!J.- i A ,... :1, ,o.... iii, .1.- ; ..' , •, :,. .... , .1., ' !.. 1 ' 4 I RI II I , ..i. I. , i 1 ' I l I I . - . i - ... r :I:). II .. , .?.1 I! . , • . Z.. . ti., • , I ... i! . 6 I 1 ,.: , ii . , 4 tt•' '-', 11 1 .._ [....__ii. .v.:-.7 . : Wt. t Zi I 1 l' 1 t ;- F.:J. %Z % ••• --. t •!!ip . .1 7._ ..-. ..1 • ; . % 'II .. i o. w....E I • I : r 3....- I ' ‘..i , • I I I I .11 . •' - • I I 1 • I 1 -• Z I Z ! I •t 1 I . I .. I . . • I . , • • I : I 1 • . : .0.;. ; I 1 i I • -r— I. • ' ;. . • ? 1 ! '1 1 1 ,I .i I 'I 1 • • I •: •I ;:; I ! ! I lb I • 0 . I •. 1 : • I . i • . ' I i i I il 1 1 . •. li ::1111 * • PI 1 ..,F•" 3 h .i :(,)2 I I PARKING GARAGE UM 8.NYIIIRAY.INC. ....41.0.11.1...I 1.10•0•All II On".••51•01.06•1! •••• LINCOLN LANE • WEST ---------- t•I , k0 qi . 1 CITY OF MIAMI BEACH,FLORIDA ; CONTRACT N..l'A•li ••........•.• ANNA•Nos.••••••••••1•AMC*AC ... _ • • Al ,i I1f.1 H ! "I l ,�I, '1��1i1 I , rI. alILFp�,�,1.11 :1 ht�f ...,..n]t•yd rz.e�. _ • 1. ,I 'i ' III' I I I' .. - '� 11 1 li } ; Fi....,13 k=,`= I / ,. i , iqi� C '111-1 '1:7"' �S� ' I I I j , ._. I Am s, {i f II I iyl \ u IIU III L I Il I 1. x•raerr i .. yr. - t rru 7.•-- •,I ,N runt nu = 1.6,Y P,•••• r.•. - ,�'. `T -.r , I-.I rrrt 9 J• 1 �F�•.�•.9•....ma., =11 ' I tl I w I I I • i 4 -- '''''_Iti 1 -Na..ut-- i P ` S1 9 3 II I I I I ocr• � Y 1 ~O I • r0•a7'Nal v.-.„;.:..! "•/ r r I "•s i 11 1 1 111 •ar• -- ----a k i W i _ O p�� uscoreN •ncrloM 1ai wnes As ' j � 1 ./ I:I ..r. n9P as,nn C owmra;:T ° CTIN • C06. •.3 •cx•• 006VMM COMMLC 1,OM • CO, [•]O ii j /,' ''/' 1 M_• •••- i S-3/ o e I L o L T• 16 Ila▪r nu,s Sr.... SCALA,:I WC,I.-0* O i r♦ l'6 l � r .0....:a•• ii.�- I • ........,........7;,r,.....,...„,.:,..2..:. • rr_...._.r...�.n. -- .... • _ r..,w.a,_ — — • - •C Z • c n> _m 71:10C-,frAW : Pz Ci ». 0.6-10=a,.........:••.....%:!•:•.: ,..•.::_ ~ � ...:.. :r�,- OS nu.wean.mer.L.k i a�!sN, • ! , • !`MT . . - ...w w..........n...."a..-,w Y t, ,n!Ail .Ir• X .a wen �••,i _ M..•.,120.0.....,..sore .,,..osis'«ni " ..• _ w..r,.,, .,••.....,ree....Davao. a:o..»s ti --�n�,n ........•IX ,4 . "-Tow ,...s —.+., 1 , •' .. r.7•17,-....."-::.. • ..f 6 =i i ao • a6w `•� _I .. _ • ....w,....r. i i-, ! - -n'3v,33U6..•-,2.2.26 1 0..Al ... .r......•r_r..maw, .w.wr• • -^... :..., •.. •• • .i •s ., 6a rr ..:6..6=�-.:'r.r;•=sMws•Z- i .,„i ry( 'w.�:. r~ •-. 2 -.ar wvw.snw.r— +'r7.te' •w •:M_... Perim.�'":::7.w..y r. � ' • • >•. ..•.n. »r.. 1.0 __-'�i - I • ry r,....awe ria.r. ...:.; 1 .w •raai a..w,l • •-i yi. ' ate..w� r ... ,—e ! • i Wu xi OorliolS Hoe ..�.� �' r. . ....r~r...~.77 u T�•.r. • �C' :__-g['.a— •+,w r rs •i 0 ,.»-.7?7-7 .;s+ --..'t-' r - �-�r�rmr.•vr,yr.u�....:..: • M 1 .. .. .. ....r. i77M1~� 1'I efo 1:1 R .— M� „w.-i.-•.u•iT��r:..—•:..:....••••,•••:••••• J ±1--•....:4 .:_ I'I • ,a6.4.:tTion7.1:enet:=I:to:::Twtor....1 -• • 1•3611671111171•16 p [ • "r moo I _ r. ;. • w •, .1 •r•.r r:-.••J .J-• ••• ..n.r.*a a.m...... ::r.•q . .r .a....rr••.,_••+.v u.M'-I •••.• J•:- .••.• .J'• I•• .Iw , :. f�.- • �..�,•r..fl..rl..w..,,.:.w..,:.u..:. !J ..•.• awrnraWS/JY Sma2n: FY IH — — it•r •�, r... is a. .... ' .., • y • ..•M'rw• • I.•q•v 1 _.....1•r._. r .r.....r�..r r y rnr; .4 1 � _ _.,.,,,r 2 2 w 02..O• ••1• - .• r.r.rte.•.,. r _ ._ ..D1CT.NR. .-_ _ ._ s •.... ..111il1111VD... i i -• a • . • Ale n11+... -- I 114,E •NV'Id ONIWV YJ Y OO'4 JAM Li 9 NOLLVON Or , •wM.., _ I .• v , Gf �_ • rte —.I'— �: JW ' • • •.:rf .00, ▪ .w .� ...rr ~__—_ �� ` __.-.�•I — . FF�� Ir .�\� w /Mw -ws.aw - I' Z. -- _-1-I I' "t-�- -- __..4...__..._-,_. Ise .•. ... •' .. .._._.-. -'--- -- w .1.7_......"‘__..._. -- i 1.-'. .� - k. I. ri 1- r----f-7- .`, t'-'-.. It, , I 2t• 1— 7C saw I srr/ ....„4„.„• I „ un.ea[•[.ewr • I .�[ri:b:v :.. oav f�1;f I s//I •.---1-...is, . r our..r.r i.-t.� .�� lw\`. r� __ -_._- -_- - - �� . • +� • • • . , t:. Mltuw.�-.—t•- *,--rte !" ).. /�✓I, ', q loom. �� � •.._-. -- ..— —_ ---� \•\\`I /f ._ ..� e w O▪ y e In l —_.�rif01'.�-_.-_—_ _. Ws ww_..rC-- •--_ _ •._— __.-- .•., q �� N.•. A T K.r I w•v Mf..r ht 1 '-i'MIAJ.11:e _� -'r i� v N m 1,/w r i •• • ---_ -- ' v y. �_ Y y ,./,--:-•••,--.2..rIS�^ 1 L i N rw mira..i..r wa...1.a.+•�._r. aiw_.ms.w • ' • .. lorr,-� _ O !I— ---'+�— — _. ors/ ....r',u+ -w +,Sig +^ `•` ,r<y_r').-r' I �J'I.• E°= •eo • ! r e 11rrFi//tr. !24.111►./ArIF ; .f • -Z ...._..�._.____. —__ •�.♦ioi.[Ei.of - I r u e� i I treno -I .r:M t • ::,,,,,-,•,,,..,...,•..,.,,,. i S ,•./.o•rvr....0,r- 1 .re..,,if.Mrmwi r.y .rOW..If•Arman,s.•r F r.R.w�.r:.-4 — _._.-r__ i — ►'.wvuw.r•/rM.w�I ___.-'-._r -. .- -J« J .... --. e, ,.ammo r/m .. --- ____-_ ... _ 'f_ i f -a, Z F: In/s�srw S ro..s AO, I I 2/•w. .1,---,, :wMyw-w...•// .liar r sin/w! Y•e.. s ,� 1 low _- -_ ,c-war _ .� r • .rsi.rt I, !.r.,r•lrVJr•N J i • • ,_ I • • • _ amp V.M'J�I - /.r M.e� JAW...a.iry.I we.rc F . 1 I mo__-. .i/a:4.•._.i11w-}_ I .. - __ __.- _ _ _ 11 V i 41.11/'haler., L.{, 1 . I e. T 2,11w•wy mow i lT ,s II-C roma...., 7. nw .. • •• ,. r'� I * 3 • 4 • I■ ...I.t}rwfvr • . [ _-- ..• :1 : I• I I-,!n�ye�.w1r }'errrw. . I 1�••v...<o.. fN2•Iw.«YM 1 . i YaXI1rna. ,f•n.u.rn+e I f .•a l.r.e... ,` ))Yf••CO, ,el•..MNN i I I )ryr2fl..aaM. \ w11 .P (t--.,.c.,aa.a aa.seor...I I mr..w.xxsawnw --- — ; �`:ev.er.frarnPOW,. -- w i:).r...f.Ao.... I�f:rv..Wf 3J•'%u•u I }•!A••aM1)•'M•O,r 2, I. •1,rv.•.r•Jr%rr.. I I YI-A+N.r)_.'ry^+ _ I 1 1. } fH c.a• ,*na�l !I .a 'Oil i I ��j Jii toi fr i• Sof Y wra22e r... a.,r .;21.x.2. I '__ - __ I--•t'-' 2_: _ . I 11 OWZfr4 MCf J 9d%"�;ut - I -I 1}•f!1' .•••/•«r-�_^•n- !. I ', ..• i. iVI 41 Pi �_y .r rJ^r.wrra. +e:ne1...: • a:a'M'l '•.I i it �4 •• 1i : � 1.. r-v n.fr.r�—=tor �>.r - • ,a_t1 iv”ese he ' WWa tit•a:xa a �. I (••,•-f —.}r•e',err _ 41.p1rNMIe•MYh^•._, '`T_� ,-' 1 I I�I 3 O 1Lflfr :it ti ` ...22..„2......2 r �~ i -=_--'',...a. ▪ �' L Q W V t. I I ' I f r--- i :, 11 ' N...s• Z W i J�: I -.2l•AO ,22 OW .«r• j I •,I...qw' O T ; i-__ '.' a-_ '—V.... -� 1 I J•.. I p I•l Jnal.rM9,1'M H'M y ++2...« �• \.4....::,..",.......1 f :rr:_.,Y .a«r Z_ I` • • I li •} H:J.J.wwr^�-r,fl Ne ,a•j1 .',----41.' .. ♦ I i w a r.• <__ i I IP.IP Tf. ", —_ _1 a OO • I 1. , a y...•2212 ._-=Y..7Ir..T_ { _.. 7,14 --L —G '...n.a, ..r . I • yr' J .•.... ,w .mss I — (� �y 1 ���- • h .i 4:_'_,u�9 -..-1.5i''', t u _ - .l�! ' ti .• . V•-t�.. est ,. j ) .L� l'.•; -,-i :,V.A.• 4 f M _ Z �_ T ..ww.l F OUNOATI ON IS' -FI PITT' FLOOR*-r RAM INCA PLAN *•PAP, 'IX ....*1; ./e- 1., • lJ +""•' ' 4 • '!q •,X''''..: .r.•-_ . •I/ .a"f - J . ..,.-v- . ,,:a.4. .,,IF,..r...'..1 3.w.,. • .. .. .. - • i•---12---7-77.-=1=f,'717"'""' , •-_f_I..'f.L.e.14_,11,_,Ae.__airvereil_ Z4.J.At..erea_.....4,,,,,,4 e. 1 . I *.•4. G.—...: ?SI 94,4..1 . .-LA.rtia-miAcat,___,,;,...•'7. irews,easAarta...OM ,,e•••7,••amt. F.3____—-PAY P•t.L.M. /-1••••••2;:ars:,•e•-•) Ae • - ...• ',ewe, s:e•4..••te-. • . ----•'•"'... •.r.,1•••••:',4 • • '1 • • . . •1 I ' Fr I ' 1 . J•..t"R.N., I 1 ' I I ilL - • ,.,! ., .. . ;7..1 —.__.....--1 1,i i _ • f , _f••/.4.m .31:---0. i i • . ta - - ' ' ! '4.II 3.4 II I ' / . ; 1 li / i ; Se,e earrreogrow, .i 1 1 ' 1,e,!MIN•••••• : • ---//P.!Mr..1.1.4••••• li : 1 ' ',... _____ _-.1171-7 I 1 \ ! Il ;,. ,,,,,__;.. ,..ewev•AI A Re% ,:-...11 i i *t! i Ake: . .,1--!.--A•• 1 1 ..... --4.-.4e I ; ' ; AINKIIMIII.) - --"••I.4 Aeotiopos IA ll ,! I,.,' i--...1". ...• .J. ; • I t.- I, i I I :: • •,_L/.' i I/r.'• 4.4 ; / -'f. ;'?''.',..' ' . 4- ' .•/1 :: -- -... ..._ . : -•••••=••-••••••••.• • It,'VP:Aerneee ''.. I 41.'l•es cr-- I . ; ; . . .1-e,,s, f ,--Me0.0•Ar PI. • 0•.141 . ... 5.J.f . C3'' —I- ••1.41 ' I '..:I. ; I as r .--- ..;:". --r:irei-' 1 I:11• . •llelLAII 0•••••III:evaaltr',Ocat • rtg'S.1.I SC.0,9 . f. 1.. ',J_S.j.jl. r...1) ,7 (":57:\ : .,• c. it r • 1 L, t;" 2t ••‘....".. '...;:,/ . a I. TAil. 9 C ', A 1 6 LI t .-.1.-. ....--,...„-------.c;,_ 1.-.l•I ' • • I 1 ,./ •-- -••• ;-1 r. 1 1. i • .. • • . • . 4:-..-c-.. ....-....•,11R t.•••••••.rox ''.;1 i . 41 i ti • ., AO,.:04•••••••• i! id IL ' . i i I . , l' • • 1 Ii -.------.-:=•":1;-* , . .*...... 6=ifirti 7 r 1.77 ...—r--,..—r7-4- li:7 i 1 ,• *: 4 -, I--4 • I , 1 . ,. - •• vi ra ! li . 1 - ..•.Vt.-- .I- .... .; '1E i: ' I MI Li,2 • ...•,..i•t—; 1 ; , .; i I i I, . .I ..., 4 A ire—.--- ..,_...,.r_ 0 o AY einem A. II . 1 I I i';',''', ',;/2.,:'i.„.' .' / ,'•1 4 61.: .. ri: ed • I I . . I. - .,•Y--, " ot US 5= , . • • . •-. 1 . -A1,..••., e.•r __ . . I 0 ••••;5 . ' •...r==-._7___f_____ -, ,,,,,.<• ,.......,,...-. , ,11 - i- Z 1-7 kt ' .1..,•INII6.1 \ 1 „,I - / r l' It '' i.''7•l'I.--, , I ' •, i• . . 1 •4 : at 0...0 ....••",.....:- 1, •\- • 1 amaz nag e.CI ---4 I 1! ••t ar l: .11 I ..1•41'10.11 IV „ . ; - •'-- — F . .....S...n: I ,..... _----_- --------- i •' • '. ' r ••••••I owe,/ .h. ,•-• A' ._ 3•4' anesser ream 1111 . •-•-•.• '-././ Na. ! • _...idt -.. t.• . 4. . . I . ItAle,f Omer•A -...11 -....,!. _.. C•.••men I) . S-30 . 44.1,ne11.•la. C...taLmeagri • I 3 I ,,,..,,,6 •-•-••—•`— 0 C T. L. . T • I. SCA_( :I loll •r-o- ....,• . . - • . .- - • - • . • • i ,:" i ia,•':,is ;1 •-r".ii2S-t . -4,04.!444 ., ft"-f 4 81 1 i 1 4 .• ) I P I o 1'••• I _ .• •. - 4 -a r ✓ 'I ILI- fill IN 1111 _o 0 o -111477:P07F7--- N r .. 4:41.4).pktj!'.•;•'' r:Tr- ;,":" -- T -" . . .' - 1 a a"; % _.. .(ly 4)-t..... :•••." r•:;'• l'.:,!'' t.-Z.ct:-..17a*;•••1 ii 1.41 4„,,,,, ....- .,:,. .!...- .:. . .. •go %/14 . • .1114 ittl I't.••i),'=:( ,nr 1'.'4'.' :-!-:.." ?::•• --- -. - • :•,,.• k/ 'il itz, 3 (V.i.r.";:' fi•.1, 4.•X a'... -a 3 I _I _ • 4 t• -L ‘,411 "iv --ii,' •--•-- a,,,.._.4 .a. .11 .»,••••• - - •'Ir.,i;"%,...t.;:•••-. •."" • 11/111-1M---=INIMI t.._ • t,%,til's (41 14-_A_ . C..4.14.4......1]0 ' '.d---1•Zr•-itikt qr. r--- 111,• 'VIA n W.', ... r • .t.41, 0 1 I I - ✓ 4% •••.z,. - (3)111,3 "-:" 4".•,m- "":". '•-•..- _. __ (t,q,i::::,•• .4...,Fispift:C, . _ . _ _kE..v..,),?,,z.z..q.:......,. 49. t -vvil.):1.-- .- .-- -- _ z 1 p i 1 ( v 24,31-a•-...- 24"-a• 2.1:24- _ ..ii.P.;At. ••••. ,"X t 4.„t.2'Xs 1 ! • 4,4 jt,,,z ...:44.....r a•.arkar..41 t..1 4;-:;'":;1:::-10.-1- •-.,;,".• - - 0 rl i 14•Itti: :41:.::t:....r h . ;- :•*" . . .. - . .- ,---•••1•- ••- m •.._. a __. _... il:_i..•_1.4. 1.- ••••• -41_ 6:7j :44_4 •?, '::" ''''' 'n".. r o - .V,E•t..• *1•••••E••-•.4..... - -- -.- •••1 -•••• r 41.y!.,..„.t. 1 . •P•kr; q 7.-.-4,4- .-„rt?!.- 4'•• 4'; i!....1 r.i.::it':iV; ._ I' 0-I 0• . 't .• •-•” •.a 0 1 g (, It' 4 .1. 7:7. ;,14 !1-•r, n ,,„ .,121:,, {.,,,.„,,,i Lim - - .;.,filo,' irti, -,9:-- ..:.i.". •---- -• - „0 ; i 4.• 4 iii - . __ ...4114.4::. "*.T. :CI .::.:. -I r ;1 • it :r::. V.7 n• v4 i.,‘ ':-..r. :".."1•:24.- S i a • j., t'...:'1'r:14.- :::•,..- :lie 0-' ilio - . .- 0 7,7. • •% : ,.....k:•I• T.: ,I. -• I o t i II • n;. ....air ...a. war c 1. : ,li r kg• _ .. .__ • a 'CP c (1' "'::: ':41';'•ir -•- - . • 41, : 1.1 : • ii 1V.;: ''114- ral; • '41 •IVIr k....I.-- ..-...- li! !. PI; • i . . i 4 iti. t 24 . _____..__ ____ I .::, '!.:r tf.".."' ":•"' ._. ▪o. • if. - II it; • 1 3 i A 1- ;1'1 I lin r sot. ,••••• ....- 1.-... -' s * !r.} t_.•_ E.4_ IA '1. I i : l'-ikare . ja. .•,,.. T•a• It • ,.? 14:.' .-,ar J.6.24 24 424. , : ...! '4.4' 1.'4'• t::: tr:,!'•F.......•-7- - -- '711-Ft 1. :1.2-00: . ,• I ; riiii N ...._. _ ----.1 . . . , t"4 •••• _I_ F. ;:.'4' ..'1. '...:i r;•"" .• :i • I I 1_1".0.- !', - - ..I'ie... acnr A444 t re4.47(-,Tlr. Ire"- Ti:" "--:‘,1'. . ..-- fi▪1(,)• 1 t I PARKING GARAGE II&NY IT INC. CCCCC.110.4.4.410111. •1024.4.1• 4.2 4 a 4421041.044 • JE t I i LINCOLNLANE • WEST ---"-•-•-•-•••-••• _ • t - . co; CITY OF MIAMI BEACH FLORIDA 7,, • Wawa..MOO.••4441110.41 a•4144..Oa- .........4 .........am." • tit a • CONEKACI Na.PA." ...."."....... COLUMN GICNEOULK 1 i I ua Is - x x '7 . xk .• a pty,� yLa . xn Z 3 3i r , . , . ..:- 4,2 ... <-s`'L x S ,7V . a - .a 2 x xa , .x;.ux �2 ►a•12�,,r.t,.t�;'skr zxi a.; x. a.,.. =e - x ......kau+y+`,t .z ,'.;- Za ; . r. ,R z z• o , t.,_,21_..._.,,•• x4R . _• + „,^_ x•;s i2: 4•••:' � , . , ii4.., ::.:, ,2xx xy ,1,,, ,.. x42 x , ▪ aiz W rr �LL x, •x srxjix , , , u p • 1.... • ▪ . . 2 x 4• •x• , .i•X:: a ala •' rsrxi.xJ .: 3i i• .`. .,... z•r . . ;1';'11,i, x . 1i •i • • x iz.a , ,'l t•a 1.x i, x.x 7 A.27..,.. .•wJ »r s•:., art c .< 1 ca ij Etc.0 a4 r Icq.rR <7 „�•� ✓ .r.':1.�.M ::MC!'cJ' U+!�±1' "! I� 'Te .i (ry y P,- I s—'II MMI+'.'� :.°'. �'r ' K tV �aw Tr 1 e.9 ./ _ , 1 1 �'t1,.•.%.'MJ js�l a�i1faJ�wi w"'SI�. ♦ x♦�pi Pr an as w.�+w s � �, COtVMN J :7 �',, J NVN•aM1J �"M , :-S ,�b.'5.1:♦ sa�,�w C, y u_. •w` Tri u i r Maw. I _ : ; . rt-, I _____, I I • o B 0 . . ; a` _ 4-_� _,,, Fr-- �I .•••e, 1". ..-----1. j_.3 w-1.1,1-.2-1. . sw s w,.•w�o P.M.T... &IA Y .122.42.- 0.1.1114.9 •••�w N t *^ -' � 1 i, ••R• IN /OUR ••oes M O 'T • r21 MIT.41 W Wet _ r _ _ !i_.rrc,- I •a dada r:u� r rQ W U 12 S- - •,L- ?! h -a 12.•••11-am•+es ?V.,Ca_eOLuuN $,, Z W _ CORNIER OIET•IL /a^ II I 1 L. :�' 0 J!i }I ,� • • r Z i ' ZtM _ —� eoLuwN oeT•IL• ...••M - eow....en. Q Ou ( Cit: ! 'J ,w/s.t> 0 '-T, vPiCAL CO, SPL!Ct O.`'' - a K,M f..---- purr•trr, 1 , JL . C coils a ra,IE a.=J -- T V PIC•L COL.•PLICc •. NI • 1 TP1C•L COL.►oonNo • �� � COL. NIIC[ O[T•IL• a.r...a,. • r..n e:a{It+ :sa,aY+t+Y:ii`i:.1111WWWI 1 4i 0 t 1' • 111 AVII r w i 1;!I -I tiF inliinttttinit ,!tt `'t 1 irs"si i itititdts ;it ttt lttti.'C 1 1_ •i �) .l !-----;11-1-11-1-1 i -I. ill—n-1 1 tt--1 . • tA }-- co I Yr.11111 tTm195'Y ri ., . ,111 iigrS-7 Y't-+ u'i-6-1-'-f .t11..o i2 , k ,i 1 i+. TIT:. -r ;;: fie - il ._L U) . µOUM(N111'W00l10wµ U)• Yom• TAYYt( OZ I I•Uc.Ouu i uo000,, fl.♦ ill �I ! m iC 1.1111diiltrdl�-tii' 011 111 ,twaiitilif5iii�si101ti istic' i _ 'e L4 7 ., r m „111111111111,1111„ ;iii ii1i r 7 0 (0 1 . (I) menL 4'.. V 1... . It-iI----t '''''----- ---------_______ ___________-------__ •or .4.--- ------1, • .MULE j• i .4 ___.1 V..,- li-- 1 "—ED•-- 1 . ... . 4 -_-- ..,s —.------ LI 1 L L 111 L-----L------------ T------____________---_ ---9 . 1---- ------ ----------- •- .••.• -::-1--:'-t---- IC, 111 • .... .,1---- .:- 11 • 1. ZtIliftfill'f2_. _ i _ i . 1.. il.‘ 1,1- ! , iit : In iP ..., PNIfILI V. • 14 ------- I L __ . ---- %1 "3 vl @ (.. ,... ,, - A Y.1 I I ,14q1,44'11. 14: --..-r- _—.-,:U.,.7-1" .1_,:::1 6: C..•I ; NV .1-- ., _=-1---.-_7-_.____. !...__,r_"•_______,I',...., 1..`.....,---•-•••.- ... LI .....,. L, ' i 4 PtIlitmi i T.---- i • ... .....4., nt k: 1,z,...... _ ...,,,owe.itwo ra.A•wo • V .-- j • . .1--ri.lirli--- ,, 7r7.:...o t..1)1.7. LI- —,- . a 4 • • Ii— -.1 • -'^--;•".. ......' 4•') 4 4- J174' — 7.1 AC4,4 S‘STION !MANI, ......>1.1...12_11_ ..e.•S•••-...t.......-„Wme (i)e _ 9 (,-,, EP 0 6-.) (,) 1 ,0 -, , • (f,-) - i I I 1; f . , II • i's lir ll . - . I ' 2,-;',, .... • . &AID 4/4 Ce 4.1,416,41,...• VO V 9 ; •••4. , t • —11----T— ........41.l.• 411 .51.114.11...,,.: —7-------li---7-24 i--1 • ,F----:..-- -LE- --LI.1- - •• • :2 . 1! / .1.10/11.“1.. 1..111..•0.1.1..X.110. SUSI•NYIIIIAT,INC. PARKING GARAGE CGNIVIIING.G.N CLA-2-2- LINCOLN LANE • WEST IINII.•MO*.••••••••••w.140C....G --N;;1 1 CITY OF MIAMI REACH, FLORIDA ....„.....„...cc„.„. ..c ....... r.6.6.... CX) 11 1 CONTRo.C1 N•.PA.41, • • • • • �'-.....- OW= 44O 1.Z ,--L.t ��, r _ w 1.4 Y'1•I h♦ 1W'M wY��/ •f 4Y IY t .ZI fir i <Z Q /1R. yM � ` z.-re ,< < ,._i � i D p a-nrn.ilr-1- ? 1 7FF •„<D ... ; R. • WM n�1 . �.. ••... •.r, +ter•. . ..•.• E•n •i I _mor.••.� w.. ice• .� ..._ I ~ _ .�©®gym®�•. ,:xr.�ra�irEs n�. ., 1 • sHavn3a A, ,,,, o..o .I" • C .�.�..w..r. .. ' —. .. ,ry UM/O LW;�Y1•2i3.'S R «.. r .. • ',• r-.__ _T� ,-,--,--• ,---,r. A - • 1,P.5.. 714: SNEVICW "•NI=770• 1'11 P- I _, '..I wa.' ~ ..v w w'' ".7ri N' Gib �..j !D.j...+J hr 1..% '+.' ' 31fIC3H�S PVY38 .. a 31(1C3H]S V(V38 ) - 1 • ...i ,1 1,:,,ps, •• IC 4C 4C : • 2- -. .1 2"--1— I ..--4,- ± --1 ' i a 11 • 1 - 1 ! i •;, 1 ........ . ...•• l I ..........,, , .00111•12. 4 ' Oldirtf, .4,41”.• I I ! -= • !. 11 i il • . 41MALa... ..— -1 1 .... I flee Jae•,Tr r *ow. A•PLOW xi,•._ -7.•7:7,T,47....••• .—-t-I .?? I q.11 '4%.!..;., fr'.. • - ' . , = , , CAIWINP•••••••1, •• 1111 1 1 I 1 E: • ,,........“, I I III 1 . 4 nos*weel ; .•••••••IIIIIVIfte, i 1 . 1 A I. ' A 1 ' I i •-•--1 —4 1- -1 , 4 21 ,•1.4 : .,.... . —J 1 -11- [-4--,--;44-.-- I - 7_ r • _. rir: .••• •- I---1---1- 4C 4C . c I I A nr AA( JE4' .., d:, .- :2 J 42:, J2. • L - .L., , . -1 1. FLOOR PLAN FOUNDATION • FIRST PLOOP ROOF IN•141,40 PLAN LOCATION S5IETCP1 6 1 -• PR A PliN 0 PLAN •, : 3 1 1,r, < : • I - - ---"'L. - "-- • i 3. I z -1 ;`,-;,',:;°,.."-- '--•—1-1-1---- __ 1-----1 •Esc TI ON ••• F.4 VI 111, 41 iu; - ii 1 4..•a'.•.: ' de • • . 1•• . ! 4 ILI vi-4 • • 4 l.7 Z 4 i 44..._ _ i_ r____ __ _. ' _ ...• 1..... Z 1• •ILOTiON ••• C......15 0c.0...0 -- .16 0.•Ia•Z N•-4......"'Mi.., . 7-..- ---••••••• ', WIWI 0•/•10•••_ I. i 1 ..) 1 , I'? T IR A N SPORMIC PI ......• ae•.• II _. __W L.. 0•••••20-rd VAULT .114r ";N•a• r -- , . •••••••••• 4..0 /•••••.III.— • Aida,. ...I,opt1 - — ••••• I •••••.• - ".:7•I'''..--- ''‘' ,. •..-... c-c • 41 iV-77-7.. ...... ( ..o Jr. 1.1n l.J^, ,J.Jn. -------� ''i .w,nl J I - IIt o •.I . _ W - -- ' - 'f,• g — - - — ——— _ - • I — • jYrM raw.r _ , l= � „�w.. � j./J f — — • 1'3 TTIIOaL iii ��� L_--. __ U. - eow Ntw o C..Tu:.-. , � Iii C 0.41-•10, too-» FS i! TION t PLR. PLC.. rwa NiNo 1.1,41.10100r r 1-..,o I/rLL4 . ,Lr <O t • .--_ j s! • , - 4..1-all.l.J•/OOr,wt E ,',i rrl Jr Q I!•1- • :-r • y$ w,�.00 riw! � •! 1/1O ruv.,l1�' r -�.vll.rr nrr INPIE&O Ma W G •s••Jr 0.1 .4..rqurw•w' • _ Q 3 t,i - - —1-i• _ —. y1 t 'S IJ,JI irisin : I.aavrwr Q,w W U ovew F l 1-.15' V Z W earelrrr I = —..�.- ..JJ .• AO r-1 •`•• r-sn h �n1- J`ww- rIr`w:erv..vJvrarw Q• • plrJ./J y 4 f • ,. ZZ<. q — y!„ • U Q V 0 a d Z F . 1-'C- .1., OtT.1L Oe •Ow OYIVtwT ____ _ - 5-36'.. al ..._ •V[C`TI ONv! �_e .r,,-.,;a., Mw.•!- _ ..A iA . . . •.:1 .• . . __ lig 11— ila 19TII ri ii-1--ii , ) ' I I I • cc,•:,..' I 41 • IIR •-,,,I rl 1111141 1 I \ . % I • lo . 1 - - ..- II 'eC4 f I I 1 - H 0V\ I1(1--: I i 4 . 1:t , i • OW-1‘ kI, SI - L o . • 0----A 1 - -- -410--- --Ei ,kl,_ __ I- --14--.6 -e- H • . - ": II V 1 1 r • i\ 1 1 I I I I I L .4' fl— I 1 -- - • . . RI' ; ' 1 I 1 1 1 III:\ ! _iso k ,1.4 :: • • • _•_1„ii - -- , ,.. ,. ,. .. .. .i 17,,,,,,: :.---'..e.,:iiiiii,. rt,„ ,i,o,,. ri .:.:s\\tcl.,. .1 1. v1_.i..4+.1.1. _171--._:.\''_ i . _7 z : t _\, 2 1 i i S,t -• i.' s 1! .e.._L_____ j 1 1 ir li 41— aw `, • ; 11 y I ICI , i; o , i zi i i . '11 h 4i I ill 'I I- I.% 1 [ ry I.: ". '-:0, ---.:- ,g, i— .•J 4 . , _ 44 ri .1 4', ' ..4 ,. 4_ .. 4. ' .i 44 41 1 , * (...) , .... i . IIM . . 1 1 1 ItH i -1 . n 1, . I . hi ! Iv / 4, 1 \ •••• ...• t I P -. ., . r 1 ..,_ ci .o.. li_lill i I LI LL H 1 [LI t L) .. . _ _ .. -41 - c,- . I.j..._., 1 i ...:c.t._ .- 1 __1,...1 1 I . ...I --.1 _ .. . • . 1 fl- ( ) (t) co ..) O.) 1 II ri • 111 la • ',,,I,,,,w• 14.1 PARKING GARAGE ..,...NYITIAT.INC. CC......WO•wa ann. """t"...tc tr..."..!,:.=^'" ,...........r....,... • a i• ! ' LINCOLN LANE • WEST _, 1 ..... §1 4 CITY OF MIAMI/EACH,FLORIDA ...„ ..„,...„,„„,.,„, ......•mom....Mt&MI..IOC CONTRACT N..IA•4I - , .....•••••........• ......,...•......-....... ••-••o••••• . .•':'': ';'•. " 1 ‘, • ...) .\ -,.:. . '... •.‘ '' . . ... .1.1-_:•'.- a .. (}.--- h0. .I lIJ .1 I 1III ' 1 �) t —• i4111III1111 • .. 0 9 i ` ' �' I Illi ! ll. ! II ' I L_ x )13:;'01 I I I 11I r I I i i .9 II H 9 9 9 H H fq ' i) H H 9 H U El !ji.,___._Ib_. H�-�j 1 III r 1111111 .11 ! n ii ' ! illilI : _ 1 l , 1i11 '! IiiI iIIII � II i :` FA•11•Ii.404 .—_. PdI ESIE"..* �- i .: I; � IIIIIIII.• • ! i ! iI Ill , 4 N HI iit H El 9 d H 9 _.a 1 Z H II H H H 9 H 41:-..- ..-.Ji.. -�� , I � IIIIII IIIIIIIIIWIr•t z,z) ._..._.. .-tet!!?tr_u!._..__ E .....---- Kit!'.r.-.wr, ,_: .!• � IlIiI ► I IIlIIIIIIIlI_� IlII }' R n t .. .` __ , .jlI11 111111 I IMI I Il IIt. ; 1 -_ P , SY - Y Ai i - ___.__ ff f C 4 -i. 1-.• i ! a,-_L_ l !, - ••••LT- - I ! , - J,__1_ i1.• 11 11 .• � � 6 1 1 U ! 1 ! I C I. Ili I -- 1 r Go (2.;/ is (I j ci l-1 i) . (.•r t_, (-) I l-fr i., If Y B 1 PARKING GARAGE ILIU s HYHUAY.INC. ++•+•++ •`••••••„u•..«. b--' ' LINCOLN LANE • WEST •'••«”-...,-' N ,y'Fi CITY OF MIAMI BEACH, FLONIDA .•••.•• •e auw..,«r•-re.N•+•..rr.c .cu+:...uw. r,u>.I .,,,---- • .. . . (IP --..— _ ._____ .!" d_q- ----0----n, , -,o----,-- r-O-r--r--.41- - CI .141 :: j--1 . triniiiiiiii- w. i ' ':.)'€) 1 • ; • ir6' /. ...-- . I .... _I • : 1;•• . 111111 .1111 1_ .._1 [ 11: J . • • • r • f.- - .. ---— --- .1- r -----;, . • II • RAMP UP f -- (r)-- —a---.3 t • . . • - A\ Li_ I I I I , , 111_ 11111111 . ; , .. - B 8 8E11388 .: ! 11.11111 .38888884.11. ---7 ,-t I ii -1 I I 1 I 71 -Pi --11.\' 11 1 . . RAMP POWN i • _ —_..,. rf, 11 o LIH1111111 r• -, nt lowiiii c- . .i..3 • no0 0000 ,o G 0 VIC * 0--I II —u 44 ) i . u Pt,:44 - 1., _ .. . A \ •• - - - - - - - -! L 11 1 I Fl I 11 I 1! 1<, I I r. I FT I 1 1! ----- *, . ii • i '4, ;.F. __„t KAMP 0~4 , RAI a jr ---- A ;, i -_•_\‘ (. j_LI 11111 I 1 I 1_ P•, , eas Bese ). 888888E1 * .. " . .- 1- ' '.----..-,— .___ _ 'i li 11 I 1 TT 1 1 I 1 q .:". 1 ITh I Hil • . 1 . k k‘ KAMP UP P - ,. „-811E' • 1--- 1ill_1111_ 111111 [ 11111H Ekt1 . •.• ., •,_ U • '... [-I-TT[TI-FT w 11 1 ri I Ti D i 1------. "I• ,.. - -0 Y . 4 Ikl ______, .. 4. _ _, 1 • •• . :- 1 _ ...(,...) ' •—i ''71-.— 1 i _1 LL1_ Li I --1-LH Iii I I 1111_1 ic, . . ---_-4.-0 a... ,, .....y.....1_I 1 z..,.. , , • = = A 1 PARKING GARAGE 11-151&NTITRAY,INC. 1110114.0.4. enti••/414101C14146 V:u, I . • •••••......r•••.•• LINCOLN LANE • WEST - " "° - CITY OF MIAMI BEACH,FLORIDA ,„,. . mooe••ONO.••••••••11•••.C.•A , - al . CONTRACT NA PA-1.1 . . , ..• . .. m4m-...AA •"' 4 ' .' ' . '-' •:•_-_.t......1-L--..---..........1a.1—L.-.;.. \.__.\__is. .__:...-..-.' .- - _'_ u_ .., _• _- ,_i ' f�T r^I:i � a(-V - 1- 11 1 1 1T1 IFIJ1rI ") i- 1t 1 �:, 1 -r LL�LLtLU IL , �_ i-T7LI71..1 .1-11'i11111 , ' i I - --- (r'' _.. RAMP WAN .. 5. L- - 11_-lel I ' 1 #, AL1.. 1 il ja Ili 1‘ T 1-1 r -1--1. 1-1i I I ! I 1 n 1 I1-- - _- _.-.1; ! RAMP l-.a.rH A 1-- - — _.. F-. OLIll .! !: L_ .1I_ � i_ I l i---1--1 1 .1. 1 - --- , : . 11 .. -0 y_ ;---;IJI1 I � 1 � 1 jY 1 1 I II1 1711---- • - RNV P..14 _ [ LI I1i1- I I 11 i i —� _ _ 1_1l i I i_ iy ((��•n 7 y1 �' I `.+ 11 G 11 J Ii a iG T ;-- ii-.__-0 3 ii :1- !� � 11� IIII11 �•' Y IIIIIIIIII �` I I �' y .: . ,.. - : ^ ILI I I I LI I_ "I III 4.tin ...x. I 1 I I I I 11 _ • -- . nm I 1 II 1 1 1 I l�L__rrl 1 1 1 ,I I I# �y s '-0 . 1L1JLL I 1 I I Liti LI _L 1.. I J_ L 11.1.,1 Iii b d r ..,:i x l!.I I PARKING GARAGEu11111 ',INC. Y.GUM..,.M�1.... } : 1 ....70:.:: I a 1 LINCOLN LANE • WEST ......,.......«............, ..... I ''p CITY OP MIAMI HACK FLORIDA NwM .......v.c AMM "'. ;t f f� . . M CONTIAC1 N..IA. A..... . s.O"" """'�"•"'°"` ............. ..... .. �.I - _....__...---........ ....--......1.--17.1.1:-..7...--�.. . ....-... .....—..`.v..-.... , it a v 41 iti 4 , , • ' ' •tylFt' yr , ' A''A 4 k *-- ' 4 ' 'AI g 41 ‘.' 4 ,'•'...e.,..,i :.. • . ;11_1,,.34 T ,k? 44 %. . ' tio(4 In 11 1 ,I 4,• li. 4'. 0114 to ' 'i* - ;?,', el t .1.AL4r k I k T-. -I k-A ;It Yi li.: ft. :4,10(7. j il.N.T.t it • 0 . 11 '',.% IlitItieA' V'''YI'.4tgrif4..A,:l : 0 :": .,, ,bt&r•iTt444.M :1.tat, .-:,: 't :.d i "ai. " i..1 CI -r rrN. I. • Ur- t .• ' It . " i.-:: c., ' '—•/Z. 0., . ,-, ,•i v..; t t Z. • t :: .1 v ••: , 1 I !! 1 , . f lt• ‘ NN iVIT4(,‘ 'r'..01.17.itk 1 —\ aw;1.,,,' ), 1,4.til , e , i I ,41«, t ,, ,,:;74,,,, , 1.. .... ,•.. 410 I ,.: 11;1; - ! - : ; '1: 1; ,a,,, ' •) , :' - • ..1 Ic . 1:.:-:-• ` f, .,) • ni r :•!,‘ .. 4,1i •.4 I - 1, ........: 1 F: ‘1 4 44* • * •,0414 PO, r'a L',1')„',' '• '.. itrf ‘. t .T, - •sal 1 lt J0 -, .., ..:::. -• 1 I. v 4 .. : _. ..,.,.. . , , , , ..., ,.... • ., 7., 11 1 I '0; ,,,...‘" Nr4 IA1'11 - •., , ... ,...: • , ;,. x !Ill PARKING GARAGE 'LISS I NYITRAY,INC 1.10.14.1 OA 01..•...VOA..1 CUMS.11.16...11 •• ini I ---! LINCOLN LANE • WEST "."--- --"--'".•-• 1 •.........-........- ••••••"....•-•••• 4 CITY Of MIAMI BEACH,FLORIDA CONTRACT N..PA 65 '..••••.......•.• .•......''•• ........... ... ii ii=i € I v1Pte."! } J• - r 3 t_LiiII1rrJJ_1_:�: i� 1111 I T[ ��r_I-I.�" �. .MI ::4 7 “. / 1 . 1.. LII • t `I1-T�f7I�1Iiii � i ! ;i ,, �1 \ -.--i . .f E11 . Il1_L_l_...1 i I I Ili f U i f iT I= II H H H H H H .;*ti ,1 11 '1 H U 11 1 ?, " .'' ! I, -7- ........... ..\ • I I_.l 1__1. "41 I ���I. Y •� �:r O tl �r= �� ❑ O O LI CI 0,6 • Y11.L .Y�. •- )-♦ 1. PY .; S .. , Ir g �. f I rn - 1 1 l n 11_l . :, _-- F It. 1 1 ! 1 LI I H H ' hi, , .',.11 F U ,H 11 H H `', 11 h H 11 11 H 1 20,1, •: 1 k t ) -f _'�l T 1� I I TT I I w !0. 1 ,lC II llF'i r .{' Ft1igi r --Iii- "fit- _._ ! :{ �I' f 1� I 11 -_ . 1 _� L_1 I I I I .1 1 --- ; �.�, Y�.' , 1 � f�. ,l . I -- - . - ,,: 1 1111 1, 1 � I 1ri-- ii ii Writ S R :f t :f - }!.i a ' I T Fa Tr.I TML- i I 1 1 1 ri' Llill' illi:1 c„.• i� - _ - i'- `I--4- i ! ! 1 I ! 1 I ! I . ! I e I 1 ! - E' 1 1 6 1 1 )I C I l 1 l l t ilii I t L 1-7 i G (1) a (�•),f(_) (a) O 1.-.) ) 1:) lul (o) l+) (!) ii (1) (�)it(-) 1L k) ` 11' -c-1,---'— a �_is__•_st_ !ill:. 1 ' .._ - f tL Yk I L ''t 1 s .�X y•�r� { ff Mi�'�'l: !• iI n ' : ( Yn. • L =al`sI PARKING GARAGE BLISS i MYII\Ati,INC. 101.111111/1/1.11/1 k.�� 1010•4//III1010•4//III/6,•:w •.»e< •.ua § '- LINCOLN LANE • WEST k — ••41�I CITY.OF MIAMI/EACH,FLORIDA, c y-w�..•• •;<�'••• •••_ •r•••A'."� I CONTI.CT Na.fA-.f _ •+• . • - c.• O Ot 0i a1 d? Ot 4 a y_ u io--n -_ - J — -; - _ — - it i `( f T Sf c y 6J E • 4, • i • I f f r I 3 f c -a— •4sj '1' 4/E 11 1 I 1 1 1 1 I 1 I1 I I 11 ,, C --. • a Y •Y • U Y U U O Y a. O Y Y 3 • / I !1 � I I I I rf� — i a ! K 1 0 ]1•c f:a 1. ` ,I I I i e. ._l_l._I._1 1 1 1 1 1 1 ., i`_. 6 •c Fo ,•IBI i IaI I IuI I I" �t e e H d d A , • TITIIIIIII � .; E I c.,... ---- :g1 1 4a1�11111111LLd II 111. 1 ! 1 {F :. — I y o- u' w a u u o o 1 �, , Y u u ( ' f I , y `° IIIIIIIIII11111111TH o I - S U .. .._._i , „_,,_ ___, ,_____,...0...______ zt . 4 JIIIIHIIIII : LL1. 1 1 1. 11 1• •f ( T I I I I T-� 11 k .�—LI—I I I I F1- I it 0 I f, 9S ' ----- II---+-- ------_Jaarl''''.-- - F' '..- '1' f, •• I' _ _ E i:y 1,1:1 '' `� �f•'- I II I _ II I• I I ILIIIII II ���, `•��_ !�� 3 � I ; :- °i • f► r A _ - Ia ifi d ' jj C 1 (I� �� Cl (: 1 1 tI I d) 6 ® Us ) i) ) (- (,) (�) 1 (-) j —. 'e m II{I PARKING GARAGE •UII I MYIIIAY,INC. ..•.... •,..••••••,....•••• cOm. • I i-±-2-n LINCOLN LANE • WEST »..••.••::",;..11.• .•...•.,.. — Mom j ,•N1 f�bl CITY- OF MIAMI BEACH,FLORIDA ........«......,....:u•' .... .... ...•.•.. '� • i COMIIACI M•.►A•yt ......bat. ��'• Ii���F� 4, 11 ,I • . ___,..... J� y o - rte;- ______z_______„___„.„„.._,,,__ ;'11. y..` 11°� Z� ...� a- Y � ,�(.1 .. ©—— —alb a� i -=i °F °I i I- F 1 r f N It�+ ..\(7) ` 4 • - -(T) / l 4 4 t 4 S y P �) ./•• f4 I no I . n {. '11 �• u I.. ' ��. T `4 ` 'Q • lid I III I I.'t) I I I �I I I I I I ' " . • sAMP UP 10{a"-FL 1µ7N "it 'i— a n I - r .1 F I ! III � II ! 1111 ! 11111 : 1 - 0 .1 1 :' B 0 B B B B By d B a B B 0 B ftRi a E"• �7 4. IIII1I1. ii II �V� + RAMP DovN To iw P4 .--_; . a F NP T' 1. FC i. -- 6:p 11111111111 0. 11 1IIWf rwn u f f 7 0 0 O U o u o' t: ` o u u u 7ON • o, {� f � IlililllII ` ' T -.1I_1:.1�_T_I . -1 ' _ 0c • _ H+ P Dn+M 10 es...PL. _—— RAM DP's',` i.C ig ' 4 t 1` j I I l 1 l l [ , s__— p I• B i ::'�B a B 6 B �• 0 B B B B B a . EI � � illll ' Il '� I IIIIIIIIII -tilt T. l .�� � I � I N I I I I I I I F E.1--.4,''''''� E: F: . .1 Ff. I I HMI I I I i t T ^ . i – 0- - o 13 o ff 0 'O 0 o a o 0 i� F _.V '-" 1a0; E 1 � I � l1 ; 1011011 of of so {T ,i. /4 f If f i �F ; ; fi • t •, - II s fi i s' • t? i A ---- • I --1 i—f _. I —i p �---r ti_ 1 . .1 :1 g > !a ii PARKING GARAGE M1uls: wT IRAM±�•INC�w ••• •0 •"` LINCOLN LANE • WEST "" +wsiii .... .,.NON:. .: K `6 CITY OF MIAMI BEACH.FLORIDA "c . .{ C • CONTRACT N..PA-{{ • .�..aw.+....0.............. .4- • . ; • . I : 1 / 11: : . • i i . . .- -•—• —"-I .__ if 11, . . 11111 f { i —_ - • I —0 c c c i L.:- --9.,- g ii g ; i I ; c . 3 -4.-• c _ . . g ... / L . .. . .i'' .. oi1 i lb ' s r R.I. upi,16.301. RAMP POse/N fa/a FL 441. 7• V , ! IV -— _____.c v r I V V . . n 3 - frOf. e a 0 a a 6 ki u 0 ii 8 El II El ft _ 4Y6f C ( 6 0 •t I I I t I C• -- a I 1 1 1 •• — i ! KAMP POWN TO.v..ri.. ICAMt.or TO ROOF a 24 .--.1, 2, 'S Z ' g -til ._i ,73 9 I T_, rc —____ 1; 'A •C k ' J I fe 01,., . I I I I I I III Ti...1 _____ V 4. 7 r 0 •1 7 •- 1.3 LI 0 0 LI u i3 L3. 0 0 CJ ' I I ! I P 11 \ 11117 1 . ..1 , ,i2r.xthir DOWN TO 3.o FL. I,:.. - 1 j1 ..t., ic..unr UP TO K001. 1" r, A .,. .7 I ai . ____, . < . 1 11 c ---- . o l' ;1 . (..) titiu u 0 8 BM 6 . e --'-- I r 113111:1111:111111MI I 11111 I a IIIIIIIII1 „ 1 • " 1 1 KAMP LIP TO flOOF 1 /NM CAMP DOWN TO O. FL. t . 9 I L i . " . 'III ..I - 4 • 111: ° i . . 'C. ' HIIIIIM 11111111111 + ' 7 > I • g it i i it t• i 1 6 i i - i . . . . . 6 ""•(!) f. c , . 266 i t t t I Al) . --....— — 111111111 IIIIII I I i 1 • r 'Pi !A 11 PARKING GARAGE 21.124 II PITITRAY,INC. •0•16.11010•MGO..... 1110•••••1/a 61".•••••01.1•11{ •••••..... 1.08.0. ' I • • t ,.2,- LINCOLN LANE - WEST --------"-- . CITY OF MIAMI BEACH.FLORIDA ...„....L„.......c„..., OMAN•MNAN.•A...4a OM.:104. ••••••.fia••.......I..•••••• , - •• ;I 4 CONISACT No.PA-66 • . ... .. _ _ - �� to '� ';1_£ , T. l_ ®---I. r -1L..JJ � fro°----{.'i) ,y– " 1111 . 1 it ti i • t' ,--- I--.. ii ii ii ii ii -- ,-- a it it li .0,-.L' I _.KAMP G•..A4 —._ 5 _._. IS D I A T I n .1-- . r I n I _�N.2_ N P ti tie ri d .._r.-ii N !1 H H ---Ii • __ii _8 J it d i - f.' Y illL ' .i WI • tit 9 ii. i 1 i. �' •.• _ „ ! l'... Itl • r fl I 1 =m :11 d PARKING GARAGE SUSS•NYITIAY.INC.« '.•••:•�'•I•• CO 444444 MG IMG o= 1 ?-y LINCOLN LANE • WEST ----••••—•^^^^ ' • 1¢,of CITY OF MIAMI BEACH,FLORIDA «.«•.•...•• •..... .:•^.••..•... •�•• Y CONTRACT N•.IA-Lf I IJ i • I, ."..‘•-•- ...'" d. . . ,0,0 0 0 ... i \ •' .' . .. .. V.._. + ....•a..A. ..n..n.r...... ....r...,.n�� e.. a ...........0•.11 u. - ..w rw•e...n»..M......n... a. . ..,,litAVIA 1.,.x _ .- 1 AV1. 11tx 9-3 ,re-IE.+,3-'6. NOI l O3S ":.c'. =%+^" _..... 7•0X. JP a.yo 'o..N0,1035 • w= Z. .-�- «• •sZGI w. 1 1 . `."'^.1 1 1 1 1 1 1 . .'.1 1 .1 1 1 1 1 1 1 1 1 1 1 1 1 1, ) ) 1 1 1 l 1 1 I I !n M ,p.�.,1in 1,.75 ��0 • 1: NYle OC'� I ,�• 'g . dNViz-le Itel 01--i— -.- ------- 2IF. e €.- ..�•r ..a.a....0..0...,...a-o.00 00....0 0. ....n.....rn..•MM I o 1 o I . r. ...sc......4'.1..::°4:17.10';•"!1:......s..e..,.a.:0 ........,'`.;t-�n - .2. .1...itgTax c _� .cv.-s.,$i.o.1,.}5 • ''= 2D-SD.1�9-'O. :NOIlO35 F_ ��I .1G- aG.'+ 'C-'O.:sC;..35 • • 'E I • ..-c, ' ...—, 1 �1 ----•••••.- _ .0 4 0 00 0., - IT . ._,.» MMMil — —.' °. 0000 j,.. +«. . «..e,0000.- .^�� =m"�� ,- • 1I•. e r n., w 000 0. ,,,, 0^ `T F..w.{ ..fa��� rT .., .mss' .-. . „----"7' .���-�n ,, o 4. F.: fibtrolL.' • Z 11 1 1 1 1 1 11.=�1 1 1 1 1 1 1 1 1 1 1 1 1 1 l �i -1 1 1 1 1 i 1 • .u0M 1. 7,.71 3NC'InS dNYC . . A` _ "'' i • I� pc �, ,'4..4'..".-•:.4.•," .." .• �: . • s� 4 _ I --- „ ^•-4; .. a'ar'py�r 3.'41/......"'"".",...,•- -7:5"� t esS-a�.-';Iy ,....._1•,_;,R I un, "-' '14 I �r r s. �� 47re sem.. i• I SrlITCNIGEA.A LI +•. .._T BANK •QNstRu•=T'ON DETAILi a i -' I 1 Room ;C}`:...... ..... I I -, e..!"A3 D'2C< I --- 1. %`Ir.r arrw af" ...« ` "........;:e+:.`r,>.. :,'`.ii - i jI. <i i� _ . TRANS:',RV R 4 SWITC`•G_AP PCONI LAvOL-- LEVEL 1 iwR....',. {! 1 l 1• "Peal 19 a 0. I Iw I I" I"' ' s a 2 �, r I- 4 Il cNE LINE GIAGaAY V 'r I •0 32+N "r." a. D4 -FA3Ri Ga'=7 C SHIEi T":"'". :u.'Ip.'•+: Aa 411.V.MO•rr.� lrl.4 1Mt! •Y � ' # ni11r• ,, 1 4 ,"hc 1 .�i•;$! ' � �k tiif . ,t j.,lN`f.i�11 t�`� '�8 t I • : h • ',, t ?Yj1 k / . It :I I 1•. 4,. , .y .,:' ' ,.1.4"4;I:g..T4D-jti f:1 I; toktpt +0.:*, :4:1 "I ?!4:: Al 1., . . 1 'I. ..,.t : r.,!, ts ,, il N aa ► i' /� • f► 1 i,v roll,,. t,,,,„ ii' ' , .i,I,A • ter hi L�k ,, 1 II, .4t 11:14 41:11 .th ),."iliifila,11''r:7;1 1:t;.1.1;i1:, .,.f n4'11114114.ti;;1•:41:" '‘jU'W'1-14 ;Ai 4, 1:t: l';.14;11' :: is +ate ',7- 1Slfv!I."f�7i';70'�,;. (, 11 lE .:i K•I9i` 4� ', . '11•,f'. •_A;1.1.1k4.,4;47/ill"' :1 r.''..:.' f''';1 1.1.::'':..:4':::4'7'2!'1'','' : ;... :4.:.' +�1,�) L 1r - ���, itii:}:7� "/7� 't.f ,1'V']11 ^7:4 �j �. t;t.S .!. ,^, y.: ,i 1:,,,,,,,-, • .,,,,4, ,, ,,,,,,,-,;(..-,i. T, , 'i a, , . I'!I•1+{$i�. i ' I. 4 .� '1:1]' ` •+ . jt 1 'in:Ili IIIIIIIIIi : i , 1 ... } i- 44 ! 1 • ' "44'4 a Jnr a� �1�' " 6 ; ,*':::)";s'.1Y rr .. t •1 /' ! 1 ii Vit' . 1. i , . , t',6". .. . . `,, .., I il.1' 'i,4' ' '' ',, • tilillig,' ;:,1':: 4 i :- ' 1 4144 4 Vt•JAAe - II Pbt i A !,:ti -kotit .,„4,,-(-. .c..11.,:. k).rAk-1 t'..r. IT.' .4t4 H. II - 1 6 t i ' ...i,' k 1 1 . fit : tl, 41.. • — )1 .. ..11,1 lyY �' �• , .Isle'• 1y± _ roll°1 /"�+ ' A 1� 7,c11 01) Trif,t4.4051.1:i i, e ,� + ..,..i.r.4. it t ,,,, ,, , 1I • �� , ‘....i � 1 i.? - i , . f ii 0I' d i' PARKING GARAGE ►'I►►.Nl1i►Ai,INC. raver r.cuau w u.p[u H. .fir. a_ LINCOLN LANE • WESY ... . ....., ,..........•..4I CITY Of MIAMI EEACH,FLORIDA .,..,c,,,on ..: •,•;';'•O"' �,,, 7 .. . 11 0141)4 w-2:-.1,74,'",r41:4, ...cze'l r,.., , .._, ..,.•e+1....--- . .. NI.TO-IING PAiNf EJ 1 IN a .."if..7... -,tr"”•':N—'•—•"". t2111...0....4.?:1 _ 1.---U1Sm*$aICED WW2.CiPAAWAMIi4NMINUNa. ••• •V • 1 4 .41..‘". • ..... „V,'•071,6...•i r.........2* . : ) ' . T _ , 5-;NO4R0 :::'-',/ ,,.. to...,,,,.....1...........- -1....1,----.----' r --"r-..".„ •‘40-.'r,v,, ,,r42.,w *;.,' ' -1-• - - -.. !Hi I : , . • .1 .,......-ser^ ......r.:... .........y, -., ..e..i 2r. •t.,1....mat 4...-y, •-4-•••Ceas,;;;,.........ff a 2 2 2 rr....7,Lk,,, , -..x.,-J..---...... r ,_.. 7 -)...-...„, 1. , .., , 4 . - ...... , 1 , n.'„::.2:242' j 1 ;71,„,, ,.,„„,„ ti,s.,....., 1, ......-- ,,•. ..”.---,2 •'•.. .711.-A,-.21222Wv".22121-..,:g.3.--me-* .%.-S. --.‘--.- i I i 1 , .......D.4.7.".-..1Air..., ,.,..r,-0-f.--."-T-_,L, .••''"--•.- -- ___ .. I ! d:::.3:"..... ..- -,,Ir-r.2.-r,",2f.,-.2.:L.•-•?.:: 1169r1-47.• .IFT :2"•-•-•^4 De4,- - -, `..--_--/ p.• ..a.,ed 4. ,, ..e,-..,,..t.-Y1. or- ..*".%7"-•. 2".:•:?'1:::.% ... -",' . , ift.i,--.17" • •Pti• r7n1-:..f 4 r:',::,',7., V r,.,! ",'-'1?"" .'.j.”-•, . i 2. .../1N.e:.'-,,,.,,,.,". AZ I''.4.7-.*,.,_, .e.....1 f. •".,V ' "'" :• ..ZI r ,L,...I.. ....., ....... - .‘',. - J•1,',..-.•- „9..,...,-..,40 . ,. Fs 1 : . I '''''''-=-I'm•• iliT' ".-" ..... .. ••••7 1.R.:-. '''"'-'''"""''. ... ,,,;',,,v.,,, - ,••••,- a?,- 2 "L..:'.."- t'••••Th‘i•-.-Au•-6,0"":.--' P ..,„ i r- , -= . ! 1 —' ta,7, --t'-,IfTr,vre•-r-- -,----.4.- '--- - ' - =- ly --7 , ..4.7.+1.1..1f.....1.14 I,4444•..., .111=1MCWIrillh '"QierlY10.....ire•I...e.!...":.2:ikAtt,1/4: .' '.. .; ! *T Va.14::"...V.Alt. ''' Ir.16.:7;51,n1:.P".‘::Z 11.1." •'.-'"... * -1..... ".. e.A.7.147"..14° 1 • .... .. J .--, 1.-.--- • ..r,1 •-.- J., 1...af .' ' .:- PARKING - a 41 x...4% ,44-- t- ' . .7......,.* , ...AK.1.1.2.2 GARAGE SIGN DETAILS x•-• ' :2, tler:-:. . •••4144 -1. '" 2.2 (,) I' 1112.k' .0.0,2 .=..-- ..12",...ai:ALIZAO:1.16-30C46111....01._-...;•...a.41.1r-40 "."--:::::Irso' V''...14....1*4111NT``.0 -3-..1,-..-MA-45"..z,...... . ma- la.: elhar."4::•CmCNIMMir. ..:.,,m'"14•7'.-4Mr..:-..."-"--.....4'...111, Od - •' "T" '"•"Jiri.""hei.=NN--... '' ..."t:'"--.1.:.JN,:$* ' T 0.-"...tm-Nme Ulite.: 17THOT „d„„ 51 ...........e.c.•-etas.%tag t'..;it~%,J4 21...,-.1.1....*:_.M."`.......,•%,5•1100aNn -• -A;14 .'..1,Varl;Z:E.:F!.lirs t'ES:ii!... •••• PI'll=iimat:'''rfort."-16 ....,...Yarnder" LI 3 111 I --",".-- ....ri...a.c...,-....%-AaPsn...,....1,.. ....7......................«.. . --..-.. , ug_i_.,.-. 1, - milogrAghile . -..,...-.............mty,AN:*rat ..4 i/ cm au hiTagi.e V . ca.., . ,...77.L..e r4Sc, • , ''''' L -.e4.1-m157- .., 1 E z 4- ,Aaiwo . _Ais.dimisi 33:1•12,.. ..... .....,..2.ze.,oketsp...44.,.....v. , ,3 i .....--d .4-40I,•••,...../ •.L.4 ...-2,.••...±.,...,,*,44,...•ie lc--0 .••-•-'•-• --• '""4".,,,...,,,„"'"" .. i•,'."' ::"",...'7"4.7 w, " • • . ,.a,• 8 3 0 5 T E M mouNr 1 3AcK mounr -____ .•.,.r..4.1 32' ;7- '.-.,-''' ...**.1/3.. la et. '•=t. ' V•-.1.-'....e,-.1."---' "'' Z'- t.i.i,:ran.VI',"4,?: ' •-'6'.1...:... .......,.... .t" r, ,,,,, ', ,...-- • -0. , ...a U ........ ........ .1 • ........ .0.. POST MOUNT I SIDE MOUNT 0 h.__ ., .F•9 WI •-•.!..,- --**4,7,-...4.--.- -..... ...-""' -7:7.!- • , , % PARKING GARAGE LINCOLN LANE • WEST CITY OF MIAMI BEACH , FLORIDA CONTRACT NO. PA.• 65 PERMIT # 6020 2/7e/ _ . • :--. , , PCINNHVINNIPINNIMIEI . . . Iiiiiii ; - 1 ., z • . ,i i ,,- ,'. ,, ,,, : x ii Ei r4 ' I iii ` • ; - 0 iiittc ) n --d Cy- .10111-111 4 / '' ili il i i_ I • 1 il:Itil.11 11111"n iL= -r.,:iirl'il.,:i..'.•• 1. i:i;fikt.1.i'.k.'.".-'-I ' 1 ' ; i' ;• II li i ; in ,, n -Ai 11 q 1 u % ! i I ! 1 )) I :I i PINEITECHH— i • o..o , i, II , rIrli 'iri , r1 i ' r M Ill] ..: , 0 1 1 itiliA1, 11 ,, I i I i ji 1 I t o, = D , • 11 11 I 1 I I dz ri) i.•1-,- I i ii:, 01 161 v 1 . . • 1 i, . i'; • 1 11. i ) g / ., • ;i re) 91 P ....________ ...."111, I. .."\ ._••• L. . . Oft 41111, -IA. • • • • • 1 INDEX CM D1RAUJING6 J 1 ��U I At.'nire..rJ2..,.. I 4'2.1:rut•k. l 1,-:C72 :.3,.. I =I22^2.-,. -... ..... ..i 01,.. '•••,-2•, .. . =I..v . -, I �� �e I C�.,u.. .. f.a ....u. . A V I—a w -.m- 1 CJ 'A.. I. . .. . .�.,.�-- ma,...,1 .- / . ^ f 1l».._ _,,—, r. I..... _.. _^ -*to, i r . ,. .— OD.....a m_a...... I =11,'... ?WO........ I =I Lxvtu Sara' • nn nemecr.w MOW.Jen nII n.awA MOM Cane C„ 0.. •-..5.-..,_.... 0..... - ..,r • Q�GpA BpCM•pRCAMTECT.. 40 ,. J••a — asp.aOlYta as is T () 3 • 1 — !I A mi= (J —. i g 1 I. -ZL!, r i �� _.. - • a i•. Ii .!f I ry.— : '7'r:ii•• I .• I I • I. , I . f • II� 11 F. 1 1J - • • 1 1-4 y • �1 r •. Ur.fit . ; • J S .1.' _ .. • 7'1 I11 li i1 NI s ;lz1 J' i i . el 11 0 U.'..f (*.--i • ,) ; 'I� v • 3: ; did :..rF.Y.. ..1VISITORS PAp1N0 1�^) ll 4 v• .4 1Ai • . . SIP - . = _ �. _.- - c :..." -70..."....a -- ` *'-- - — 1'ai y •. • • LOOM 1 . i it FLOOR PLAN 1 II . - - '� • WILDING t.i1EW WORK- • ww • 'riaRmr• S wrsrr�� .uena.+r .j ww® 111 • fS ylawonen .. .. Vv - - NEW OFFICE rte • ''= !* ' •-I_ . . . •. A-1 ' ") 1 1 I 1 y 9 M ` Ij! Il': M via ' �M -- .4 . i II �� aL-1 T, 11 .; 4 A ► u 1 i1. Iill Oi 1g , > lii p 1 - 'I ® N 4 4 1rl or I ® it i i"� " ► N _ I f 1 ! 1 01 •11 I-1 1!a 1 ,...+A " iiii►.! ij j I I� 1 I ! 14,--, _1 1_ 1 1 1Irj �y III, � _LL �� 1•111„! �`,1��� tZ:0 ; l w— , ! 41i1! } I. 11 1 II y -I 1_ —. •I, tit' –./i-._.- 1.; • q I ' i Itd G ii ,' A k I s1'I':. , ° =-=_L-1-[ E k 1 1yV �Ji'Jilt.' u. 1 1 ., I, _ i :.__ 1.i lit !, .i--, ( I �_ I i -x — X411 41, -j 7t=�: 111 .1 1 W 1 .� =i 1 1 ".1,7',88"8"",....-7.... ..Iu ..w.c rtr o►cwuslai o1"8"1 C.hiGpk *.. fEGAI\ Irl... O w 1 II.() _ ���, - tw _J/ 'I I •— I' zxix+raw ..... .._,.. al )hc ' �_7Fk ___ .. .. - il I c I;al�a'� amiamm1it�WJ.�IIM .111111011/11•111•11111101 E I 1 linCli OPS •L- ca El----- .,, , __._._. vl,1 --�� --r 1 i -_) M• P3i CI I �_ ... :=L i ltC I L - --ae ::i L. Alla_ d— )1 — Z_ ��---� � I �i—mac i • 1 PAIS C Ii �. 71 _4:C.4 1 I I I I � ot.;. r.. m ,if k...�_ II _ nas.:ase- F g i i ri�5 _- �' f E C� C b r: i\ Lc-cam_ r . 1 cielf-RAL MOTU: . . . I 6...... • STOP • :. . • . ..,„. . ... .,..... . • •,--,9 . • . • . .. . ......t '- '.. . 0 ' 0 ..... • ... .... .-4-•,., —. al.1,...,_ .:....:.. ., -. ••. . . ,...,..._ I- mew ocrIca.n.00n PLAN 1 . . • . . - . • AI A . . • Orrin•f'Von.. • . ; .' • • I... *--i—. ! i • ... 7 1, :7:.7 . , . , : '-- • .• 1 ' . I ' . . .. , ,......F.• , .n. . 4.,I.,,i., i 1 . .,c. ......1. . _ ' . . --- • . . 1 1 -I - . . • . 1 I Now A . /— . . ...-. 11 li . ... , . FLOOD PROTICT1ON -- . 1 .;1 • o ....;i-=.- . -..N.;:::.;-!..:...c....,....••••• • a . °Neva welly' EXMOOR 3ERVNE WINDOW A--':'' RAI i'•.-7‘;-........:4.,.. ___ . . ..... • / • • ' I i -I I --Ho. -- . . . , NEW OFFICE , ! , MT.=/../. A2 . . . i I I i . . . . - 0:3 .. . , . \ • • ' . s 1 1 gangRe4.POPTIES: - • , . : , STOP. I. _ • . - •,._ . . . .,..„, • . ..„... . 0 .3 - • i'.......L.,43 , . ... . .. . .. -....el . -.•. 411kV•1 I• . ...... . .. . . . • .rNEW OFFICE FLOOR PLAN - 0 i , . •IL • ,• -." ....-! . ..:,,.-:.. ;.. . . . . • ., - 1[ I ' •' ' . I. . • —.. • .. . . . . • . - " . - po- .1 .. . . . . .... . 1 • aatftnar , MC ildl A • 1 • OFFICE CAMNET. EXTERIOR SERVICE WINDOW • • , . , . NEW OFFICE 7-164-ENA 1141 • . . . , • . . . , ()III . . • . • 1 GENERAL NOTES: QQ I 4 .1! ==... ' i I' 7' STOP i.;,==::: i. . ................ I .4 ;._ a......•*I.00,•••••it Sew•..:r• II i • • .ft,,. a,—V-V:.--,1-240'.;------•- 1 = i i roe. >r .��� �„�•� Tb .r..,ew•a _....-wri« ,", 1.r...7.-:...1- , - ...--.a.. 1 C7 1 f . , r .. ) .1 ."' '...? A • OM— • ®w Moor NEW OFFICE FLOOR PLAN MM M1..„.........r.-.....w� 2C la �_ bat ((NN � i -- -- j r icei pi ,- y amnia E ... ,.... '!I 2^ • 3 S8 0 w • OFFICE CABINET EXTERIOR SERVICE WINDOW •rr.� �..r. fi�iF°t - NEW OFFICE • ...io ..—_.. .....—............•••...•m—•momr..............mu...Z. maam ..s. tam•....-...........-.............-•,....-,.. A-2.1 • It)MI 011W44 IN V V' 0141. 101.114011V•IMEW/Vk) 1411,i....v. •Hrzg ...".;',.;.—;—,:;;iz—.i.,":;;1„ :„.141 if . 10: i -k 1,1 RI 1 i i rf if ^Y fi'.0....:,I R. t; 1 1;il i', H 1;1111:' 1"/ :.1'4:2 : Li 1 1 I I.1,-1 it-,.. 11 I! I .1 is I: i; i!,tl'III ill if `.1 I :. -...,,i _t,I11't! 't III li 11,WI!!ill 0 CJI , I; !!)1!;I;1;;I;j!!:i lilt;i!!1!: riiitit$ 1,-, •. , -__ IM3, Illg ,— gi a ' 1 !I .; f ----- --.-__. __... lc; • -NI 1 it n., 1 ,a5_ i;fi 111:. 1: 1 1 I .... i G , 11H...• 1:: iii. , 1 .i __,.....; I .: ,. 6orAii ,m.A.FAMI 1 , . 1, ....-: t iii : )3 ;, : 1; 1 . 1 — 1 /Ts , 1.1 3 . p 11 ...1-1 41 --„ -- __f __..., vo.v.....7\ sisA I— - stik 1 " 1 • 1" — 1 lii; 1 ;11,11, M iii ij I 1111011 E lil r @ li ! A 1„pi ,__ ' 11W di I Z • .,[.,—4- 1"-+-• 1 i MO liel . - i i Mali 11111_ : ;I I t - GP 1 -- 1 i II 'A 'f 1312111 91 1 - 1 il If P .: . 1111 .. . i . T, 1 i . • i , ..' .. . ' r err.. " . . . . . . . . . ' ..*I' '- It' 1 001•111,1 ILI • • !IM mumsa iii e • . ranra:nr• --- - -; J�i��J� 2nd.FLOOR PLAN _ .. .. .�wcm�A.._.... ._ ._ .._. , I 0. cl'I"r'ro111LDING I•EXISTING FLOOR . f~�� A-3 ()all -s.-rrn Er" T'fir?- ftT o•�ii..• I - i Y--I 1_.. ... ..�J 2."2:=L ( Maul raszaf� �0 4".....— _._ ---�SAS .Lsi a —_ W 7 H + r /3 II1rfAflPlAl ._ _ !air• h t • ��f 1-� '7/D�71d/ `L. '� a 'I _Imo. \\.) ! -� if';'''' r �" °. t- I I ,i ass- __ � ,�_�-+. e"-- s c_ s� '.rte +►I-r."kasr^` I wr Z _ i -,- 0.- j.-�'.. awe - •• T ± L ., r_ I 'It i1 d4 i 3/ 01 d 10 b a b d eo a d 6 D 0 3 r . tin ma 11111311,4 ' ©I - ."I"I.r a t Nal 3-11.-Z.4.—. 2nd FLOOR PIAN ••• Mall. .owaM 12 rseml.A 0.0 MOO 0 BUILDING I•EXISTING FLOOR 013 .a.— y say—s.: •iT_'— ::a.l ate- ' =•� •fir �y_ ?rim':i __1 611 --4--—tit ;a v----lt,_.i,---1 ,-.- -__;=A 71.7:...,..u-7. � ' i IIr...� -r�--' �A s� ,__�' _ - 3•-- I 7 I • �-'T �I �. _ —.—. _ —.�..� 4.9 f. Ni ^4s riffiiniffil OHMair I: l- --_ 1-7L--,--44—_ � ./ {► L (% _ = I li � _ - 1v 1 r - =1 t'I- El-i _T. =��� -- -- ---h ._ia.i s 1L1P1111.11R,1OM07MIllrr l' j.'1-..'1,:.4-,..,_:"..--:'.-.,-' ,-,. -..,,7.".:'!.' iI - , � � _ 0 ., . I.' ) moon.at , '� {k , 9s gid.F1.OM PS.zR1 _*4BM —S wFAA71fl ..^ AI da t..• • :.. z:, I , _ i .. - - a :41 .".!J! .. H j i1 • I _ . . , ,a 1 II_ 1 t i . - � 'l... '01=31.,4 ,, 1 ( 1 � _ ,• t I MI : 1•co1 i • ,. , I . ..i)( C) — . .. . fit __ Za 0-�, 111. aA IS J •ji ,. ./ ' i._I I .tm1; ... \ i ''''.=..f".'"*. .1 0 Oft /imps pl vm A Aim 'MA A'MA..,.:OMAN fit I i 1• iY>ri � g v i N ir1 I o ii �.. . . — 1. t•I ' - ', i j �� m a -71 !, 1411 I f ig l 1 I� -� • vim, it ' i ,l — .1 �+ -'1 111(( ; II I I .A N :ilei IlTit iii: ,.. 11;11 41.0 ' �.I 'i-- y4! – AUrP! Il ; i‘ �, iI � he__ 1 I N .1 j{'_ — I 1 n i A E 111 � i,lit� __ �i v 1 III il'1 ,i i ' 1 iitlii a• { ' ' __ a _ I4t ■ � I � i . , _—1,411 o _ .._.. (�y" I , � , '.. . ' r, c I !1, ,il 'i t I int f' _fi ', , ;, j ;r i itis, .. i I Nw ( I tri t i'!i! ' 1i a ii 4_ .� i1 i$ ii • ,I = I t' o--� _tea .—. _ II tE . p `� torrid Off•6 mein( i r? '.= IS MO - tend voc—a' 5 ,•1''w%j1 —..�.. 81 - dryauaia 6auaana ...1\.....A...\ P- _ .. 111881Mt ail all/ It Ir-'-''' 4 lilt r!'",,i 44111111., •11111 'aggifliiibraagnaliC _,.a.,,,-• E -J - I s )111 E6 T * 4:7 Q G ' ¢ e — l7-- _-� _ -� —1— — — !� = . pr _ tE Nil ' _ J 1 11111 ilk •akTaa:•--, iliD r-lead....:1,--_, -4Pr- _-_, , 4-",- i LL i t C-i-LCL I J. 'YC.I o I I I .� .sc rI/,/7/ r� �J ' �� t _ "' / // y II E Q F —.� 1 MI/!MIN! Rim, .fib IP( ' { I j i -- _ —_ - — II m oma' ems.. I _ fjf[[`O I s. :r_�Jv - v�i r� I ods. Iv z `•� ¢' -r I r"7„,_. I 121 _ J - iThi tet__ aT. - II I - •- -- - -rLq_r == � Vii'.= wiz 1s=_ 'z- tea_ �: i:o . / 9'r 210014 DNLL5IX3.1 ONICI MOM, la wl��, W]s.e� I ww« !WU 21001A w 1 ! ''M y .. - 4-fr.. is iN11.2110.10114 C ti ' wan -111M11 `® it !,• .,!1 .cmc;‘,..-. - ' . . _ ....� yT(1 _ s•'Y r+�• .. � i. j � _ -oj I I : I _ . if , hH - -1 • Ilr 114 . 11 I kv ,3,- 1 _ i , ,,,,..1 &-viii.,--ii -_-_s-1:skii.,1,,,1:1:4;;;,, _.'1-1_ A ,: 'i, 45� 1 o--- f -- -i' t AI i---0 - ,•• -:,7 44 , - - - - -. 0 i , Ill' © e r� .7: . ii �, 1 t 1111 1 tl�,� t W ` 1--Ei aur' 1 ! ID` .; I� 11 Mud d' I I1 1 I¢ W�i ,+ I 11 II II Yil 7 O ` 41 II i-4. ,¢1 i;,11. IQ3 ___ II 11 ii I'. ) ____0 STAy _ k ., ; ! .i,'—i I :'-- --t— - ' % , '' I 1 i .'I ar.. .. CRY OP SCAM/ �7 GAM34 4.AROWTE°TS-Wc 5 7 Ii ,,,,, .�. .... VIYI OFIGIA P PA _- D f i 1 - • i 1 1 •-- - -- -k---dam , - II. I I r —I ill il :'": 11 .11 � Ij 1 ' I is ' o- L - ,y y ,', I' • -. , , 4 41)11' II, , ,..i, ii4 . . ,,,. , .'i!/ EH._.___,_. .______,__ ___ . : , ... tii..i. , A ! .,,,,,,,,,,,„. , f ,.;.,. _ , , ...,, 40, :,„:„.:,. _ i ,„ , „,„„',„Z ,., i_ 1 ... „.., ..... '.'N 'I 1 11 �� ,fib'1),'�..{�► c'---—I 1 - - � \.. �� D '+ it 11 II ;111,,--,0).#1 1 i ._ -, i•�-. �Ail`t. ( �1 w ,.. VII (WPI r 1; ,„:,, ,�,-r. T., M:,N �a �. `: , �r'J 11 el y 4 I' . =_ 1' `moi 4 .i. o--(D p 11111 >�\ ��..„,:.,,, ,.,,,,„,. � ♦ �I _ .._,� it!1k I, Iti. !;4:i! , _la 1,,,,,,,,,,,, i ti. ._. _,. ________ M .71 1 .�- II W I L,4•11 �I.' =,M 1.-1:t.--. .11- .. .J. w14 ti ,4•.i 1 1=I '1 vI 4•q rcf/ITAw illewt - • ,. Q^GAAtlC1CiH•LRCHITEGTS•WO O . • PANIWY r .....•161..4•... .6r••16ar.11.4a6rwr.r-.14•... Oft IMO fi jest, /� I/ ✓� Y F1' r /. •.__�. -Al---_, — 11 s. 1 91-7:t !IT, mil \C!J DETAL Der_ \,.// I © 4'3� * .- .. • .,,,m ..fir ,' ( jI I c 12 _��I Iw `1 {I y �y J it #12.1.+,,,r0 PETAL ®' - 4• Ii c 7 NEW CLOSET 6� i 1 AIL .II' Tiy-- v. 1I ET ! 1 1 I sr `'r I :i + m 1 } 9ETwL /:1 DETAIL �a� DiTMI © ,-1)4"' DETAILS ` 9.1nA A4/ 0"-p �� iV� I n} t i i j �` 1i•il G 1 i��Jr i I `,,,,, . Ns,4, N\;-." / , , f • 1 — 1." ) ' j n Iml 'if I, kkli 11 1 1.1.41:1„.71 ._ ,-1-..-__--1---( 1 10 .'s,' \ 4' s—'..\' '..,Z � tia. 0 " r 1 fig \ + a-) in t ii Ig I I �i� r.�ryri.t 'Fr ,,,,..._Fplif-,_7_? „ „ 1 1 0 0 .iiii, , . , , 1 _:.. ,.), , iii 6 . . c,), ...7--i,„....,...N b • 1 t 1�r1=5.,,,,s +vv wwalw YfLtr71 ,....._(1)G41416•011'ARCHITECTS•WC L 44 _•S li 'Unite=='”. vlolrowo PARKINS/✓�'� L .�.�.�... rAir r!-- . I. t 1 ' t i r —:t—:.�- I j:. t .1:.L__z_.. .......L—•-• () 9 ° -11 1 1 t j t 1. ;ii ,V: , t1. -- — i. . - �,, , W _. di ! 4 li t i i° t 11i se O MI YI __ II l ) [NW \ (.., . __ rii .1_\.,) .. • 1- l,dL ifit'! i _- ., -lei ti � iIa i 4 () '. i i-ti I I t :i t �e ° �SS I �i � ) '�� t I..,, • • 1 Ili is " ?i is #;_ I ;t -• I_.. >i i°i °1 y;aisano...,7 °✓>1+w,r tra p }),,A,440N.YL41,,,NTkuT::•rY.., • ° t "41M..7 ". e —y `'°.- rti°1�YY...11;',7",...,:7--:17:-.:--': Iwirl�. -. . S. • . ! ! ,, i / i 1 -. .• /. -. _T.,-.) 7 . .. . .4 -- ,-,1. .t...-..,......-.: .. .f. 4, - ..:.--„.,..-.:„...,... _ ..4!..,, :f i --I ...' I. . .. : ...- -...-- ' ', - .-- ,. ;•-. •.-./. . . . . . . _.... .•• ; 1— . 1 1 ro \ l• 1 • • .. .,.- • . r . . • - 4i iT 1 i :` - ,_......., I poi I I 41. 1 ;'11'till III • I ii) ii) 014 k I ,I9 I Li 1 ili ..... 0 ------ --,---- - 4-., .--- -1- _... . ! iLl'__fdEgiiL lallW1"o111 t,.dii1 iliII lb i?1_i1 i 0 I la14. . 111•W1-M-.,1-:-:,-•i-.--....•... . t0 4 iq i - t I )1 r.• . .(i) 7 i j 1 IJ I -1St . - i... . Ii (C2..: . I . 1!.‘', pligi Ili 1 A tili A. ' i ll Mall ,I I 4, . I [ .i . . . Mil II - ' . 4) ti.) . .....'; , . . Elf r-,. [f !ii(..- .- - )11 .1 ._ . I:. iiii p 1.. .--= f:•:-:.-1. - . -60 y I I lir: C- "idg 11 ; 1 i-i '1,. 1 - " ----• ---(:) • , '! , to .II;.... i ilief=t=ift va,!...,Mimi i CiDGAMBACM RU -ECTS•ING . yr .1 e,tel.1-4.=,.-_-__=_ ,....... ••• _,,,,.... I IMMO IM.11111.011•11 MINIIIIIIIIIIIIONAINN.M........060__,/ , OMNI /0 Ilk 110AV fir() ..._ . i'Y �naeNSs nkoarrw,s aooa'1411.11A woos - - -- -- . ' I F .111:1 !. i ii f _Sv„tlBBr'Iris Gr3..YON=StNij _ .--_-_ --• __ VIM o – ca,CA NSI:,_INCE lr,^,4 —_ ._dol'ai'.. - — — — ...I. - ... __ .._ . _- - —=-=.=.1,--11111---V- 0,.![R_ _L _ .__ .-- ^S. - . _!/_4_.-4-- --`-'2f ..-.*:. d __ ) pflON LINId NOM .-iS n__i..- A. • DOOR SCHEDULE ROOM FINISH SCHEDULE H�ilii�iri�li . W�1 ��1.a=..' i III I ii iw ���VAiiillIMMENNIMINifillailIMIIIMMI��� _ W f i 3 • ��msumi ��.���_�-rte-- f,����v I• ■r . EM��� ��� '! .i ��uMiii�mi ns.0 iumi� 1 _ 4• mimmonr. . imommilimummtivimimmimmicomamffffr_� rammmvma unmemilimmilswimimmi ..• , ., Al NI N. C • • Till .* • D> � . ..r. i I_ l I i, 111 • • FINISH MA TRIAL ABBREVIA MONS ilij • • 'sitar— AI-�fEr1 rir _ ROOM FINISH,DOORS WINDOW SCHEDULE A-7 7 • • • • • • • 03 I 1J ;1i1i ,, i 1 Irilik i 1 ' . ! i:',I I, hi , I i a U ! ���6i1 IIIA 1191 1-1��. .� .. IIII 11 •11 i i i��i �1111ii, ii;!I, ffill II i ' ' 11 a . , 0II ' �, . i 1 I�I � �1 .iMi ,i�'w � 1 i . ,;►` '�` 1 iv 11 ,1 , $fo oig1 ey1 q i 1111 eil I ""I : fiji ii II I 11I iiiiiik ii 1Ili, 1 111111111111i1 1111 1 1 1111111111111 1111 I 111111 qIi 1 "1 1 1 I 11011111111 I 111 1111 111111111111 O 11.111ilil1 ill l l 'I II IIppIo1 t li IIII 1 I i iiffl 11111 i , ,;1,,1i • I li I Ir1 c i 1..... ...." .... MIT"Y P/W[tW , � , �.)GAH•4,RCIYTECTS•INC C "IndW .rr.r..... .14.10.11.4.11111141.w.-NY...w+.. 1 • . - . - 1 • ,..„•,! 'L5,11! . I -,. ,-......,-._.- f,-.2.-...K;-•-- 1 Pi ti. ... . --1-4. 1 7 I 2 1 I s WM • ca I i RIM a I I V • 2 =Mr El ' EREBEEE€ Eed±tt3FEEEE' Ti- . Mit..1_ • . — • - ": ' ... -,,, .. 1 • . ..' : . i i • I • . .. ...f.-.: .4e. , ir )-- -'13' 111. 1 _ NORTH ELEVATION ' Plil',Ii i iill 11. IM ' , ' 5 ill ,,:..<. . r , . --•-t•–,-- — II . , .•;,',,,,i'. • 1 11 1 I ,OM.•11.••••11k1-1==. • . 41 i ' . .. . ; ,i1INEMEN NW . : , )=MEI MIIMMME.I.1.1111. . . , M1 NOE 114 Ill 1 . I . I =.— --— —— . ,••• , ,.................,.., i • WEST ELEVATION : . . . . . : . . • i0-811,4 NORTH&WEST ELEVATION —A_a . • 03 r • • •lii;11.11 _ , ill I 'illi MI itil 1 .:;„ - __ I • 00� �i 1 t II r ;Ire, . .4 iI .-1j .• iIII __ , III ..„_, 1i1 1 1 roil ,, . I r?-, . . II III' v1WTOfir •MKWp7 GA H GNG/YTEGfS••G i;Y ne i wwi 1 �.:I U I 1- + 1 ' Iiii -. - - A [ , I .toili, --114SI• (■■a■NI■,i■■■P_ t i I (=.-filliLL. .‘,____;_ ill I , ... Lq- L, 1; bei' liii!' • PARTIAL EAST ELEVATION - w+'", i-.._—...,.....•....,.._.��..� D- A g e • 0 3 ..• C)I if 77111 U1 I 1 11 I I 1 n....... ...___, .----. i „ al ,mossmnisio NOR )„.„....4 • IMENIMILIIIWZMIC I 1 st • • 1 , lall l' n 1 311 I i r -----,i.....----- 1, , • ,,. "min= -=----...ir:,7 Mir. I WM q IIRIFIMPI MIFf 13011) 1 • fit fi • • 1. .. ,. , . WPM 1 1 ' soft mown. I.. ' - I=1 i I '..... .... . , . . . . . . ., . . . • DJ- . . ; • I.• 1.—. ..... . . . , • ,, 'V' 'dP.ANTIlii\J-L SA.37 ELEMXTION . . ..,„ --i•-• --•-- •lit [ -,I h-- --f. T . • , ,• i . . 1 . _ ,_. . cfrci .11 .414.__L_ AC 111 . sa ss_ lit 3 I _,s. At :`,‘\..] i Iif II I Hi 1 M- iii' •11100113 :� F _ 1 • -_ I / . 1 1 _▪ ,®F —I . - il 'IF: x:111 3 I(, I _(I , . . 1 i . :. 11 4 I I . , 1.1 . � �!� —1����._. - I .. • 1 I - - - a 3 (i .ri � 1 . - n .. . ' - . N , I X s _ • ' 7— .8 f ' fbIR IN o' I ► t t II- i t � - .1 . ._. iv' . ; .) - _ ! Ei1 -_ t 4111 ._ :--- ... ° ° ' .' 1. 9 ,•-••:+ .4 '°rrr of 11tixuw 1 GAINBACI-1 ' • 0111146 • Ilhallif ...4110 sem. Org. VI IF 4.614.6, 1161.11r 0 I- ...IN.,MIMI IMMIIIIMNIIIIIIIMIN ' - - - - .6nii:.•19744:;:n. t I ,• I.1,- 11411.11110/1•91•111•IMMO ow gio3mHotiv.Hamwe ) =WV el 11111dO.1.11111A ::::::r......=;' . A MAI WPM a°JUJO ........mmo 1 1 1. s . g i 2 T T T T- 1 _ _ , I I ,.,.„. ... immungt w-;, Sii MI I 141 _ ' • o \ I \ / 1 , I i 9-1 -2-_, ® I 1 \ ' i. I IV ""i I/I *--- '• I \ 1 liu , . Idi 111 1 4\ .1._ •• (..• ,1 b ICI2 --- _. . ,_,. .0_, 1 _L__ 0 I ii I R . bc , • • , ‘\ 1111 \ \ 4 . ,a, . .11 I . ct um 11 .* , 1 i . , mil _ig ir uta . l 11 ••• 1 ) 1 --(1G I, 1 4 I 4 ° (:)%1 .- ilaT .4 :t / .- i 1 I I 1 '.' 1 t , .., ,..._ sr IffIrtfr -lift la•--.7'.11-'-11 Irt . ,. _ _ 1-1- - i- ir ii 1 , __._ . . 71 1 1 "11 i I ill I -0 I I III I I II t i 1 1 1 , 1____ I I •f : Of I .___ -1 la 7 I . *1.'-'1 ' , _._ fit_ ..,-_ „ „ 1 (-. :_. 1 - i?� ' reg I o 1 1 .�, R_\' , , , _�•u J— ii - '1 owe I I I ,11 I = 1 II' ■i i - ' r ,. I 1 I ,': i 1 1 .1 it •1 I j I :._ . —°k 1 � t. 1H2L I: 4m 1 0 •'II ^ I II I ' 3 1 - -- _ 4- �� --tet S I1 11i .,. .,.. TIC'`, _-.61 t P.2 h .z ; fib yo . k J b (bb (b 1 b i'1*: 1 .4 nrr�lr viwrowo rMKlNa Q GAABM711•AROHITEGfS•Yk; - • I %NW t I 7 ill II I I II , - how IN. _,___,4r , , . __ .1 11 4-t 1 -11I I=^ Pl'AT• ; --- - Jiir! : \ . 1ifP - 11 J -- i "11 ( ,— I• 1 • I � t 1 I1 •1 F' ` '�`r: _ _= 11+� .. 11 Ii IIS — _ 1 ill'• -- I I �; 1)_ 0 gP - ".._ -_.n._.- _�_..___- 0 (... 14.1c-. 1 -'. l'i'' 9 '"+c dnr °I.681"1®roust Q,GG ...ot!!! VISITORS PARKIN i1�Gf�FI'�(tG FYTECTS•WC •.wru•.rrr -- - -7•=___, •.4-.--____:" «Yrawimma M ra...•+.rrr j -40.1141 • _limillly- i I I� IIII _ ,, \ '1 .;.d \*11' • \ _ „, ._._._.____-TF.._..._... o `.• 1r. M,-"'��., rte\ 7 • �� 1 C I :`RI_ �— ctT��, 's—eipt ___ , tea® _ _ s1 ,.Z �, \,,,, �c --1 , \ I v\\ 1 { I I � � rina° 1lawi,\� F — _ N 1.;. -; (,_:t ._._t.-._I.. .r--.�...�L ' I f _ —. v wrowr PARKING� Q� AE GAMMON�RC�ITECT+•M . -- — _SUCH h wiraraMr__..+_—_--J ♦11101% • i Ir1 `.r• 1. 1p-1 14 d11 {;1 I• . !j '' iii - r • I ra R 1, — -- r ---_- 1_. t to 11 _ 1 1 tiNj :i.iW:Y LI: 1 1 =� .y!Y vil_1 ,y' 1 i • 1 r, i . " yy El 1 1 ' 1 r H:=1=====.11: 1' ! __iL i i — T - r r r I 1.1II il{ Ii A.4ri I"I ifi- It I t if I i!, ti:1 11� j I i i.IP 1 i!,P..1.0.), 1 1.lit Igli 11`1 ' • f I • n 1 :�:ii ,:g"1 3y 3A Hj Y ; ; :I;NI11' jl . 1 i 1 —...r�rc fart ti'Yii;+Yi 141431 pp .F Mt',(� 111GITORO PARICN Q�GJUIf1A1a1•�kC141 Et�f5•INi: ."4.rwrr uw rYr ,— i M -Mk III V .joimb, •111000,' • drW00.1=="er ' i...pi.. ..................... ,..--.. ) 11;17131111Vd 11141.7.1.41!1 ...7.47....--r.... . ,F2-11it_WV.HCVEVVE,(1Ei-::v....t.• .1,...'.....•.:........• il 1 ?, : .1.',-"1.',... "" 1 7.,r ..4 I!IL-11L-11 , ••• f ''" ,l'- ;,1,-. r • .•'••-•' . , "--:".•=r-'-'t.141,), 1 1 I •I t•- 1 ''' 1 11 i '1g N ' i I 114 1 I ',•'.: . 11'4'4 .., 1 ', •. ,'.: , I ,•,',..-,. ,..,,,,',.., '-,. .'. ... 1 '( .... ,',1...-.').'44.'• ..,,,. .-„• ,. ' ' : '; 11 ii . I , ' . ..i, , •t,:-••c,f,i7. ..... -1,, 1 I 1ist"-r • +.15,.‘r,...,,,,2,,, .4., • .4 •• ',....'' l'i, ji.i.11,i'l; ... -t, ) .. ' 1 d il it - • ' : ; .,.. , . ,'t ilit t.', .. . 1. ! , , • .i•i ti t ,..i...t . ... ,.. . .. ,.. . ;-----4-• ... e ... .,.i... . , . ,.,...,,4- , .' i sit •:..,''., .-..... - i '',,,:?, •, 3.. rt- ' 1 1 .\., i 1 : . I IL; .......... :. ''' , ' 4- I 1 1 : • , 1 't,--- - ----'• 7 . . ,' 11 I '1, •:..- I i • II 1 , . I ', 1 t t if--- ,.•,.',) 1 i.• -r'..',°:.7...',-.7.77'.,-., .1,. .- . ,.. ...• . i'A,, ,. ' 1 . i i li ',, 1-* `-'• .1-::-1: : I t ! ill , , • • fl 1 . It i , II I I •-•` '-. '',iit\t‘ ',:•14 1 t• ----;- 1 I - i I , ...% agr.-,...-.•'' ow -.-.."'N 1 j' i• I j I j. ' 2.17..F.:r' — —, C) 1 1. , . ,L' i ___ ..•— . , , , ,, , , . isc-rr '1 - 4--!: -11 !.. vil . I ' ;;261_47,.........,_.,__.J.-,t • il* .1 , 4 1 i • ...' I ._R ....... 1,007F1-4-7;csilli.:41:7---lbr " . ' izzz,trz.:,,.::_,',...7.: '11 . 1 . . . • . . ...• U ! . i 4... . ... ; • . . ,. -- 4FFICE .t.: . 3 : ;• • . .1 ---,7—., 1 . 1 ............ 164. ........... ••••••••.1% ., ::?•:..Z".. , . • 1 Tif a -.7.--..-=, ..: . 0 bat . . = . . ri . . I" I- ,, 9 / / i i fl .....„.„7„,././... . . . //:" . ._. ..... . .... .... 5... = _=, 11, ; • , .. : , . - ---!r-----.------1 ._ __...._ . , I,. 1 , / 7 . '?. . ....,,,._ • g. r 0.40-PM0,•frOSTP4 A.0011 Lf-- - ,....., s-, • . . . . . . U'., . ,„.. ....... . — I - 1--- - —_ — 1 - I I_ !..._ ... I ., III '1 _ __......._ li _ ,___I .1)' • ,• (,.. -b) , ir---41 . .. _ . 1 - 1 i I • 1, • .. . 1.... _.4. ... H 1 1 u II 1 ...._ ,. - ' •r f .--*-" , 'fitP / . ,_ 1, ..1,- A ..... - • I I I 1) • i I ,4 _di. I II airi ' i.:_::.1..;;,*6:,-14:.&'! ..:I :_.:::.jrh1:! : ---::--: ilk Ai!--1 1 •H**; rii.:: !.:.---__:•1_,04._•_,..i I 114111- "i..:-...- s ... ,,.. 4 ,"r" ik.lf. A*...It,l, ,lip 1 I • i • ----11- tt., 0 _...... ....., 1111 N-ir-s C VilI.l./1ii1 ^TL-,tiar nr,t1 .i. )G.ArtILIGH.ARGHIT E CT S•INC • - .,4.'-•,' I -...-.:7-.....t•“. , 0•1-41t'ittie:r.lat032.641K, gra% lair -440, la . 1 _ -- I 0 Ii i II I A iF • •:.: j.- Iii_ 01.-_ - .r_ _ il 40 .A., ., 1 I % t---- -- 1 1, -,' .rll- II ti ,it[ . 1,-.W".11 g ' 1 1 1 V MUG 0111111111111...1C. LF DWAYYi gLAiS/ r. ;I3 .. .- •PgMKWG Q"GOHBAGH•CHGHITEGTSING • ark -II r iipolk %my . I .4.` ---- -- .-. • . .. _... gy:, &lift'd 111.10111;IA :::::::::::::=;:i i ' ' a A :_-,Ki•t•:::,5....1)-ruv•movtr4v..) :),,,,t, v,•;; -,; • •.............g iti,I i :01 1 ii, n g J 4c i 1 to 41,1,i1.0,14:- A i '41' i 14.4..4 If!1:411 i[ 'A ,•4; ;..: i ,ti • i• _ i ill .:; .,:11 . IA 11. t ' li. .•1 •NV•13.1;1,' ri ;.;.„,.!i i!:....;lit , .'.'... , .,i :,:4,,:, . , .)---., '\ H _ ..: , i,i ,,,,7 i.a ,. ,.„ , ,_..ti.: ,_,,.•, i 51 .1 1 1; ii . ii 1 illif t i: qi, I ;. 1 i N 11!t- '• 1-7!‘:I I I , [5: 1 PI 7 l' qi , " '!Ii‘ III:11 i : I I 1 Ita 4. !II. ' ' -4. , Tor, iitolini 'l 1," • 1 4 - !flill,iiiikm.51 wi• If • -I Airf. ( 1-"\) ,'-. , ' • -- " * sk,•••' i'l _ ,' 1.0 .- 4 i LI •<• ' (. ) ,i •ii- ',I,•,..1 4• fltimi1;i A r'ill 41}:,1,.'- . in -- ,-,1.: i ) 712117---li 1. !) kxkiPil--.. '11,.i• •.'. g 1 L: ._. _ .: ,I t ; fr.; ,,, ; it ill .s I ri is -[.,., (A.'. ri .''1• ' 11 . 1 III k 1: il ' ;;Z.: WI { t_ : 1,,A-1_ 9, • 1 l..;- -, ,-,!-.; 't ;4t„•,I- • :.sl.ei '.its I ti 1$ , p•:A i __n_i . 4t7NI .__,..4 ....71, 3 , 1 I II 1 1 ' ' T.-\i _;1-2-rii • .,,,.- _ • iti, ;:tstri -N. ,,11 ; • • 1 '. In: r ,',' I -''N i \ I I't i 11 _:L'C,i-4- ' IP.:1 , I 11,k; 111 1. .., I\,,I, I, ,4-171•4\ I i . 11 , ' • , \ ‘,..., _ _,1--.1, i . < I ,, , . _ --_____,. ,„, 1 i - - MI! .. ---1,,--44--- i : . \1 , : - Ii 1 ' , . v I :i li ‘ ,, {P..;, ''.• :-.'---L) li 1 1 • 1 ! 1 il_i 14, i Ii.j-1.4 I, i'. - :(z: V 'm it lit I ) . r ,b,4 !, LE i I .1. i 4 a„ ,., . . ,,, : , ,. ''' I iLi.' ,A___. r i_S MI _. juaragrjA6.41:, .,. gl I 1 •41-- ,-,4•• -- , -1,-,_ '. ':44'Mt 11 ,41 -i i:-•I ..j ---- -di.i• v 1.', a •' -Lk ii - .•• 4, if _ i ,,• .At .•- •1 :a 1 - I -. $.0 - . __ 1 i 1'7 # = lam'\ :, r; . -a . ._.__ r� rr. I ,.11„00600. GI 11r.¢= Fw 1g 1 zi�`�, -s 103S .,Ni.NO I1O3S i ++ -� .fr:7 -, c' Imo:, ••••-• / D 3.36110 ,, liEL,:r..___ ... . 6 :i _,-,... - /1 - t 1U j 11 I I Ir" 1 _ _ 47(31 . tom_ THE PREVIOUS DOCUMENT IS IN POOR CONDITION ----iiri. -- i id ti, ii , E _•- -..... ..''..-----"--:.--.1.1....,..-:2:14r• I __ r_ 1 ; , SLP-j► 1 1 II R4=1 II ED......, SECTION"A" SECTION'S" e;i h ,iwr! '...- F--J'-- -6. `TSL.-1 o-` ..... r4�' ' 1- -_.__..._j --- - , SIN" _ .-.- - ill 1I i1 7s -1..._.�_. I41J, i I SE •C- x -.;?- 1 i ()3 I ) t O) -. ;m M..ii r ,cH/ — 1 Ea 41 ili u Z L 1-• 4, _ I. ice; 1 ii m rrw ►I II I - 1 . ' -1,. ,, ` i ii[ ii r I�'�; 11 I 4 I h ��, -11.u ii L 1 i '� J' iFffmm -- �r cd r .I \ — II Nu' ilf ;e17.1 II _ II 1 1 Q j.1e [ it r 11! il: 1.'1.,'i 1,Ii,l I " errr as ra sial L Adf Q ,,,:.".._... VISI'TOfB PARKWO BOC.H.ARCHITECTS'INC v ........- Niv i.1`i ":..'M'a't.....°""'_-=- __ _ ' D • • - --_ Ii?il I r w , 1111111 Q11 st�.-� z .� ' 7 • r.r.._ 3 liIiIII I a ; III ' W �.. 1 -_ 2 _ _ ea arm. .... .... r . r„✓.. 3 7.1.,k, sk.. . .-.„ _-.,..; : ----\„-____1 e..77-7.77.112.7.7.- 7:- ,, —... - ”...� �� PA 1, R7 FLOOR FR.�MItv6PL, N :• ., 4 I�� 111'1�Pw.Lr...4M�--•1 ..r a.v.�w'... �.r rr..-� I. , ' •—�• • '�I ''►• f. I { qw i•= if ; .Ia - !� _ i . � JeN,NOMID o . 'G• n.01.T.1. ,..e. - I © :_•_r- •v+uw scArow �= tP.1 :\.:111.1, ill =g . • !I iiik -. :=_=.--2 . ._. ....1.7. IIs .1, , . 1//1 i ill 1 11 i 111111 . 1101 1 If ii ii: I •1= i t t,6dj1 1 11:14111 I IV I i '.-- '. .1/; 1 I 411 �,I i rf f t' I ! Iiii 111 1 I ,I i ,--..g..3.•`,.. , I I , - i Iall 411 i 1,i 0 I i � ,. .,.„ , ti 1_ a — i•, i i t O` ,„--- , 6 ,, 11, t .. 1 , —11171--f............r.. • ,. vV ICRY Cf' 1. f f_.,",.._ T0 `MA iAMC Imo Qy��MC.H 4n •GRCWW co TECTS• C w filcl 1 tr..t:its" - -- "wr"w U .. . . ____....... . I i .i . ik I I 11 i 1 ii ,i 11,1i1, iiiiiiiiir, li! iiiiii ! Iiii RikiiiiTirkli limbo,. giimillitif . , . ,, .s, :1,,,,„ Li „I, 1:1ir,„ 1 Ili, .4Tit ,-,1 , ii 0 Nui, II lit! .110 1.01 . idq"LIi II: II- I qii"lith. I- 1- ,111 Oki f; 11%4 ;111111 1 Ala :f0 liitif 0 I hill 4111 I I Op Iii tie q lq Ilia.i :lit ti;il tri 10- ,, ., ..i. lit , „ .,..110 .1.i . 1. , 1 al . ,. 10„Aim,i I i -. 111441 1 .1 1.1 I '11-. : ,411.i.4 j nu . 'I i.".(I 1441 i i III 1.41114 Ii' ill 1;1 oil pig,.,:,i1;111 jj 4 Ile.ilit 9 iIiIIIII'l:11: ' - I r 311I10 -; ' IIItti I.;1, ail 114 ,,iliitn 0 1.,,„11.,t, 1 1 1! Ni1101, 0 ii opt; Oh Ili! ;Ill 110,..iii-1 1.1191'11,": i II IL 1 LI 1 I. .t ..1 1 t! ;t I:, 114 113.0- I, ,111011 al, I I lilt i, 'II il'IL P 1 ' 'II ".1 111 joir I _ , i . . ..,#1 I..1 lir lir ii Ii did i.a; - 1 . , wawrs I 1 • $ 1 ' I UM ' 'II'1 I I ..1 Ili i I I i i i Ili I 101 11 •ii• 1 1 1 1 •A . . • _ i PI Of 1 - 'I E 11 i H 1 1 i i. , .• 1 ii I 1 ;; .. . I If 1 i n II; 111 ,. TO 1 d) ii i i 1 II I . I' j Tilrli litq rilifil'i 1 l1 1 it) I ,_( _..„... _. it ) . .-.._-:,:i ii-iilwal . 7t III . If 1 ' 11. . i14, it li illti 4 hil -,v. i 116.61116611.666616 NG. COY OF*FM MACH . i 6 i ,...,..,a 6.....,...., vissirmis PAPSIONa eTiC:IDGAMBINCM-LIRCHITECTS.INC lb 4 I 4 1 'ILIVIEMLIM"'-- -- - Om% 41111.11, . I- MI NA" 3 -- r.•=4...:•. -. III �- -`sem'-1 3—t.r ..M.tik'. 11 I '' .43.7=',..17::".."1"...'r".-,..73 5'�=:::::-3""" .' .......ice...�.e., �j 1- -4 +=w a t : It ..=.1.• -•� i�.-,� ..ott.ontt...21. .6.6.0001 w' .. !•s , ✓r -•-•71-•-•1; •r.�. .. A .-.ters. ay••••••• r .......- � • � nt fed iron.Kill SYNIOLS a{J 'I all • �.... '''.1...".:.=.""..:= _ �.m..—.. _ SEAM sc�ucs 1 _ _. �_-.__-.- 7:-1ST'=� :__ __ W _ -- �t._ ---------- - 1.. —,11—........ ��- �—�w+w te AT—, � -] 3 i — -�.. is-_ - g 1 .. :• . :3 ter'- r.ruw.e. • -.u-m.:v^`v aI .:211 • t5 Ai omit -�.-m.-•m•-ym•.1.os-o•.`m' '--••.... .-..r. :::= r_.— —�.__ .�,, g41�1 l ` (..r R r _,•t i dr" m LLs ..SaA. .xxsax,...• • r() . 1.1 . . , , . , I ,, I , 1 ! I aril Jr.rR.."G- ',arc c,m.--rM 2 i. ..s.L-L:+4.ps �.�.j...._ I r._.,,,,_.•cow.Lacus Vide I l '.�_is NR�L- '�i. y 11. 11 IPr. - rY J. � y-f IF '-lit ♦: _� ..ra.v.w..es • _ -_---_ M—,ta __ -- _ _ ._ .' w.iOrS'1.4.t'tlCTi11L c ^rece►3rt77=e'.r`Jaa ...........-..= c is O Or:dait.T. L__ —__.____— .— �NF41y NO1F5 ' 'w._�� �� tNCS.I/ilzVy.. siL'a.J'v'.'�-.:•. .—y...... r •,,,„:••• .2^- ni: i .121151. ---.'1,..--- ..j.,_ -Z-- - Ei) ! %................... ..............,...._ ....... . ................._.... . ... „........:,...„...... .....-- . ... _..............._......• .....i.......- p r u lamenealr.-...DO.3.,... �µ 'E "ter `# I Edi —4, - ara.ar.+aaear .. 11rWsr:t',mt." ;r , •• ®` rgl1•.w Rv�G o� o:aa[n :w:x srx ryR.r,yam•N'MCu •rsur!Ma LINTS IOI LL a:.Sl�.:_i.��l':x...214 Tri=.7.r...�� t _1.l.L��' "r:+.�._ - 1 �'.r i. Fax 901EOur I1._ ... -- .... ... .i! Y i .all I .. I i -.....I I - k i . YI } r } g .d —MI i C 7 pili I , i 1;3 _lr= • , itis �! Sdi 1 + ' :.�_. ! sl I� i til1. 6 ` s til t! � -- ` I '11' i 1 .11 ! ar i 1,1, �I , t �1 `I I.1I I ::-;41� `���.�d� `n�� 444 :444 ��4i I!; . !gifil I il i i lit �— s' 101 ! ; 111111111i • ••111!Li..41 ` !Il1II ! iJ , I1 I t l: i ii i .' !! M ,r7 .._. L l. 1jVI si..: o 'ii t ! all; ! 11If 1:1 hq1t i' , [-I- ! ` 11 , t i I i , fi N � 9111 11 011 I �_.—.._71 1 , �I li ! I. I � ' lt?l M i 2<...,,,,N\ I �I 'i� l ,f�"s " i� 1111 1 � l I —; I: r• .u.an /h GGMB�CMAfiG1YTECT7•WC i _. ; AOMPIMPPMP1�+t.yiiY�owu�an¢%r L-81'. �_(1) Miitir 11'1441:::. ,NW v e) 1. _off.,... •,;p: a 1.1.0•111•46Sv/-mc.Lblo it.clubs -- ' _. 1'^ iia ' laL , _ 03 $4.--,)1 '�;,...i..,.. 1 i aisiiiI.,1,? i1i1�Viii1111,1IlliP 41 Ii' ILII;�I 11l a 11 if ,"I E-I i: ii 1ii { t c. , es I tiL .., 11.... I'll $ i <N'• el L... _ • c` p W..• cti •AIOI eore•rw j t f vFita.r V.6-:'.:. ` ' I • 1 I i 1 1 � II I lII ' � .. ' J i 1 ,,, 4 l N.c.... • II. _, - 1 li I ., I' II ! i \ p /.-7-,. _e, 11 ' ti 1 i II. I �� E '11 i,0111;11 illet 7 •. I ".i trahlrfirmli 0 CAQGAt iaoki AROHiTEOTS NO1 I . i , I I ti 1 OH i ! _ sii spI s • 1• p r •11 iI• . 1 M . • i U 1 i 4___- G ..!_. ani -u.vr �-7 ._ -. 0 ' I .•7`•.'.'!'-"w�rY.aw p.m* �` /h�y�mSS3�ON•ARCWTECTSWQ o L Y UU 1 `. 1 So i I ap ... o .ji 1� ,a e _ — P' p § ' i Vi •o: _ __ - - • ' _.. . _ . ------- OFFICT r.,p, .J.1,,,..._ .._ . 5 .. -- . - 1- r.--. _.7_._-.7- .41.1:,,t .. ...__7. i • -. - ....- _ ...:r....-- 7- -7.-7 -.•:......-............ .....; 1 U ,.. • sit,- E.i) .7.7,.7.-zi" ••".L-3.it,..—,... ./-...- ...4-- --,1F-__ ---- - • .. 11' ..... ., r_...,,,-w---3,----ti ---".b.-• ...L.... ... 11 . P.. .- ..4 A 0. is.z..._-•----,- ti aanziie.....:,!...7.1.Z....1"4;7 r • o'S -1-i °. .Ki. :=1:ri....÷..%.1.:41. o. •e* ( '7.3 7;1 .r.e.. Kett-; s ,•• 1 -1. -0- . utz.v.--- . l' iarar''. ••• P o: lil ...C."-' . .4..., • i'S.T. ..- ..._,..7;4. . i , . . , a ,5,1-f<P.......-2.•_,I .M. Y.7...s......,:2,./ .... • ,...• . ..... •..... . . . 3 .., .a. ,1 tr. i i . is tti 4I ti 41 Mr(T.,..y... . S 1 ... , A. • ... i.. >, • lift ' 11 ; V' b \ , d $ • 1 .'r w t .1 } • • _. .._ a e i I w a .o . lk d ita an 1111 't i` e I lit I u a .•, Y I • 4.111111/11111111.10. 1M • I • v f I III I• 4 Vrl w�►A et' �_��GOMiCC'M ARGHITEGT9 WC i.. ` i/iilAro./iii::. `� • . . o ` _Y •ro r. .. i •`� i �.• i e aft • • y _I I � , �I F III ,mayigr*vim a.r.r _())G.A.N43.6,0H ANGITEGT5 YIG i W Lievoile 1111111101 • • • r1 rY Pri ir kit •it . S. • elf F • Maciwoinspsir.r.r ww.Y'Mu � mMBCL'M GRGIYTEGTS IIIG !'t £0, • I r' rc,ca .rx�. a:Z. iirilli ._ c—ms ^ =s. F... - - _''ice ..s.7lL'.:,.L� N_� .. ��.r._.., �[aS eL _._ .. ._._ _._.____ w. I _p Y g • i _ . • • • tip • • : : . . 1 . • • • • • • • • &,E0f.No • N t t 1 x ._.._.... _.. ._. ._ _....s..x_x 1 • • • •: t • M t : t r 1 . t i c . I : F t t t t t t tt t t x 1 : 1- - ; g : v . : 1 i , •: t : t t I gglI : ix : . • r x I " I _ . 1. II 1 . . . • , : :O I .- i 1 : : : :1 . '. : x . : : , . t I • 1 • . t i + x 1 .. _. .. : x 1 : t x x g- F • i : 1 : - ` c : li •. • .. .._ t •• . ' . F4 : . . - is . : . . . 1 : i e- i 1p ' _ •••• ( mwGers4•aaNrtccmwa • •1 j �iRE rOFy'..':3""".• mom-D 4 .._ tI! Is . Y Ei • M . I' } • 9 • • Ns it ! •9 M: • . Ii y •' ?: I •: IQ I ••' I e .. .y r _ • 1I • • w • I . i -- 1 is A 1.41;3 .. ii , [ • t- ; .i7 c1i • fi C e • , - r e . e e C !1"A 0. i e € 1�,� ji!�3rs , s e — . :11:ti C C e C ij�iil 41 l+1M . . la C C C f toift .1 • tf C 4: i j ."' •1 _ e t t >r C .. C e e e. • I - e ± . . - .e e . . •• - • • - - - C . . .• . • I . : e C. i . .. : r . �4 .R: 0W iW�u`M%Muc /t �._(1)�BSC41 GRGWTECT5 INC [_y U 4r I ark , 1 ,„,,,,,,,;...-e;;.,;„";;;;;,;-;,434,;.• tit, , -......,,r;,7.7„.„:,'1,.../Inf.1•11 nmwan 9,1,11,41144/1-1 PNO 11/111A; ' 2 ; 11:'11111111,1 lillillIWI:it 0"th %mow A.Liiiovd .L.Eino3 *a amilad IsIOVEEI IIAIVIIA1 r ' r 1 •N .' ft,.\\... • 1 .' ..'.A•,- •''' '_ i 'I.'''. '.i*t to ....•, Is , ,i, --ti i • ' ---------`• 7 I— — .i t : ---r,i•.1"":`"' 111 il --,••••• , a a t P. ..t...0 );63‘.'":• A Jr. i i i 1 I r- 3 r. 1 , 1 F 3 WWII:: °).-7----H . --tr---: '-- j1 illi11111111111 1;t11114 t 1 1 / 1 '---. ---44L. . * Li ,ok e .....,1 . ,,I., . 1.•‘11111 ,%1 161 1 - ---1 6.- i. 1 . -- I , i1, • 7:1 . - .., , , . . ... . , (O. -4,,. ,r, ...... ' • 0 ' I • '-j--- --.'----, I i- i 4111W i li I 1.1.1 ••••...... ..••• e;1 ,• Lit * • • t. , 61 1..... -, '..1 i 1 I 411- I i i-lj.. 1,4110 I) 4-.11 ,111- .11.10 .•b. Id-. i11. ! -I. 1 • •.• . 1 1.--] f -- ... _:‘ +'• 1 1 • Fit.4;) .. •,., ,i, ' 1 1,- r--.1: i - -=' ,jimiliiik.01 --.w.,...i.; ,..___„,v7,_ or ...- , , -- agr '''xg•' •v• cr-14 1 , ; I 1 1 4_1 Itis $11 .0• .. '.' s -. $ 1, 1 r ( '" I• g . idtr.t7i, a.. ''Z-i ' —. 1 , 1 I • "-, I ° .' - f -/ i i.. e I .., ... 01-.-4-----f -i.' -(1 .1 I .. p - 14' _.. .., V 1 1 4 r I f - , • . , .....$ II : I I iis . , •---€) 1 t -^.......,.., N $. i a I li . ,10 & .o 4t-- • I r 4 Ii 4 ill • th , .. v __ t , .... ,, . - , .A. ' I • •••• 't i -'t • _ ___ I fl• - ‘ • 1 • 1.11 t 1.• .. -__•_. f 4)- .11 n1 , i) - ,... ., v ._-,i t1 I i o ;ar• j ''. ,• -Ili ...., — . er 0- t - • rallill.04...... IP lb i t U - I d- c1 so N (13 & i Ir - - -_..�_ - i . , • . APPENDIX H . , . Wage Table • • • • 3 ADDENDUM NO.1 INVITATION TO BID(ITB)NO.2018-232-ZDC WATERPROOFING-TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH,16TH, 17TH STREET, AND 1755 MERIDIAN AVENUE GARAGES(INDIVIDUAL PROJECTS) Page l of 6 • General Decision Number: FL180221 03/16/2018 FL221 Superseded General Decision Number: FL20170221 State: Florida Construction Type: Highway County: Miami-Dade County in Florida. HIGHWAY CONSTRUCTION PROJECTS Note: Under Executive Order (ED) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the E0, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually. • Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to. the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1 (a) (2)-(60) . Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts. : Modification Number Publication Date 0 01/05/2018 1 02/23/2018 2 03/16/2018 * ELEC0349-002 03/05/2018 Rates Fringes ELECTRICIAN $ 33.11 12.31 SUFL2013-039 08/19/2013 Rates Fringes CARPENTER $ 17.84 0.00 CEMENT MASON/CONCRETE FINISHER, Includes Form Work $ 15.49 0.00 FENCE ERECTOR $ 12.82 0.00 HIGHWAY/PARKING LOT STRIPING: Operator (Striping Machine) $ 15.07 0.00 HIGHWAY/PARKING LOT STRIPING: Painter $ 12.13 0.00 https://www.wdol.gov/wdoUscafiles/davisbacon/FL221.dvb?v=2 R/2 1/201 R F Page 2 of 6 HIGHWAY/PARKING LOT STRIPING: Operator (Spray Nozzleman) $ 11.16 0.00 INSTALLER - GUARDRAIL $ 13.43 0.00 IRONWORKER, ORNAMENTAL $ 13.48 0.00 IRONWORKER, REINFORCING $ 18.43 0.00 IRONWORKER, STRUCTURAL $ 16.42 0.00 LABORER (Traffic Control Specialist incl. placing of cones/barricades/barrels - Setter, Mover, Sweeper) $ 11.59 0.00 LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor $ 12.31 0.00 LABORER: Common or General $ 10.69 0.00 LABORER: Flagger $ 12.53 0.00 LABORER: Grade Checker $ 12.41 0.00 LABORER: Landscape & Irrigation $ 9.02 0.00 LABORER: Mason Tender - Cement/Concrete $ 13.91 3.50 LABORER: Pipelayer $ 15.02 0.00 OPERATOR: Backhoe/Excavator/Trackhoe $ 16.24 ' 0.00 OPERATOR: Bobcat/Skid Steer/Skid Loader $ 12.88 0.00 OPERATOR: Boom $ 18.95 0.00 OPERATOR: Boring Machine $ 15.29 0.00 OPERATOR: Broom/Sweeper $ 13.01 0.00 OPERATOR: Bulldozer $ 16.77 0.00 OPERATOR: Concrete Finishing Machine $ 15.44 0.00 OPERATOR: Concrete Saw $ 14.43 0.00 OPERATOR: Crane $ 22.46 0.00 OPERATOR: Curb Machine $ 20.74 0.00 OPERATOR: Distributor $ 13.29 0.00 OPERATOR: Drill $ 14.78 0.00 https://www.wdol.gov/wdoUscafiles/davisbacon/FL221.dvb?v=2 8/21/2018... -Page 3 of 6 OPERATOR: Forklift $ 16.32 0.00 OPERATOR: Gradall $ 14.71 0.00 OPERATOR: Grader/Blade $ 20.22 3.85 OPERATOR: Loader $ 15.53 0.00 OPERATOR: Mechanic $ 18.03 0.00 OPERATOR: Milling Machine $ 14.67 0.00 ' OPERATOR: Oiler $ 16.32 0.00 OPERATOR: Paver (Asphalt, Aggregate, and Concrete) $ 13.61 0.00 OPERATOR: Piledriver $ 17.23 0.00 OPERATOR: Post Driver (Guardrail/Fences) $ 14.45 0.00 OPERATOR: Roller $ 13.67 0.00 OPERATOR: Scraper $ 12.01 0.00 OPERATOR: Screed $ 14.15 0.00 OPERATOR: Tractor $ 12.19 0.00 OPERATOR: Trencher $ 14.74 0.00 PAINTER:\ Spray $ 16.52 0.00 SIGN ERECTOR $ 12.96 0.00 TRAFFIC SIGNALIZATION: Traffic Signal Installation $ 19.07 0.00 TRUCK DRIVER: Distributor Truck $ 14.96 2.17 TRUCK DRIVER: Dump Truck $ 12.19 0.00 TRUCK DRIVER: Flatbed Truck $ 14.28 0.00 TRUCK DRIVER: Lowboy Truck $ 15.07 0.00 • TRUCK DRIVER: Slurry Truck $ 11.96 0.00 TRUCK DRIVER: Vactor Truck $ 14.21 0.00 TRUCK DRIVER: Water Truck $ 13.17 1.60 WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. https://www.wdolgov/wdoUscafiles/davisbacon/FL221.dvb?v=2 8/211201R 1 1 Page4of6 Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject .to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and w9rker protections under the EO is available at www.dol.gov/whd/govcontracts. Unlisted classifications needed .for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii) ) . • The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type (s) of construction in the area covered by the wage determination. The classifications .are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local) , a survey rate (weighted average rate) or.a union,3average rate (weighted union average rate) . Union Rate Identifiers A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014. Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate. • Survey Rate Identifiers Classifications listed under the "SU" identifier indicate that https://www.wdol.gOV/_wdo.l/.scafiles/davisbacon/FL221_dvh7v=2 R''i i)n 1 R -- � f Page 5 of 6 no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier. Survey wage rates are not updated and remain in effect until a new survey is conducted. Union Average Rate Identifiers Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage • determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier. A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based. • WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3. ) ,should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: https•//www.wdol.gov/wdoUscafiles/davisbacon/FL221.dvh?v=7 :_ - - ....:.R/2I/7n l R Page 6 of 6 Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue', N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7) . Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc. ) that the requester considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board) . Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4. )- All decisions by the Administrative Review Board are final. END OF GENERAL DECISION httDS://www.wdol.eov/wdoUscafiles/davishacnn/FT.221 dvh?_v=7• .R/21/9018 INVITATION TO BID (ITB) • Waterproofing - Traffic Coating Services for Parking Garage Decks at the 12th, 16th, 17th Street, and 1755 Meridian Avenue Garages (Individual Projects) ITB No. 2018-232-ZD BID ISSUANCE DATE: AUGUST 13, 2018 BID OPENING: SEPTEMBER 13, 2018 ISSUED BY: ZULEIKA DAVIDSON MIAMI B • Zuleika Davidson, Contracting Officer I PROCUREMENT DEPARTMENT 1755 Meridian Avenue, 3`d Floor, Miami Beach, FL 33139 305.673.7000 x7490 I www.miamibeachfLQov zulei kadavidsonOmiamibeachfl.4ov BID NO:2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 1 INVITATION TO BID SUMMARY I MIAMI BEACH Bid Element Description Invitation to Bid No. 2018-232-ZD 17th Street Parking Garage:.$ 700,000.00 • Estimated Construction Budget 12=h Street Parking Garage: $ 598,900.00 16 Street Parking Garage: $1,810,000.00 1755 Meridian Street Parking Garage: $ 1,900,000.00 ITB Title: Waterproofing—Traffic Coating Services for Parking Garage Decks Basic Description of the Scope of Work: The scope of work for this project will require the contractor to provide the complete removal of the old waterproofing system, concrete deck repair, new waterproofing system and re-striping as specified for various parking garages throughout the City, as well as, install parking bumpers where necessary. All waterproofing shall be in accordance to the manufacturer's instructions (Sika or approved equal) and shall maintain a 10 year warranty of labor and materials. Bid Issuance: August 13, 2018 Technical Drawings and Specifications are available for free download at: www.oublicourchase.com OR are available on CD for pick up for a fee of$20.00 at: Procurement Department Third Floor; 1755 Meridian Avenue Miami Beach, FL 33139 Pre-Bid Conference August 23, 2018 @ 11:00 AM ET Date, Time, &Location: Procurement Department ❑ Meeting is Mandatory(only if box is 3rd Floor; Conference Room checked) 1755 Meridian Avenue Miami Beach, FL 33139 Dial-in Instructions: • Dial the Telephone Number: 1-888-270-9936 • Enter the Meeting Number: 9415468 and then press the pound (#) key Site Visit August 23, 2018 @ 12:00 PMET Date, Time, & Location: After Pre-Bid Conference ❑ Site Visit is Mandatory(only if box is 1755 Meridian Avenue checked) Miami Beach, FL 33139 *Site visit is highly recommended, but not mandatory and will start at 1755 Meridian Ave Parking Garage, 17th Parking Garage, 16th Parking garage & end at 12th Street parking garage.* BID NO: 2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH • Last Day for Receipt of Questions: September 3, 2018 AT 3:00 PM ET Bid Due Date &Time: September 13, 2018 AT 3:00 PM ET Bid Opening Date and Time:. Immediately following the above due time or as close as feasibly possible. Formal Bid Opening Location Procurement Department (respond to): Third Floor 1755 Meridian Avenue Miami Beach, FL 33139 Response Format: Per bid documents: 1. Sealed Opaque Envelope (Properly Addressed) As per Section 0400 Below Basic Bid Requirements: 1. Bid Guaranty of 5% Please reference Section 0300 for detailed information. ® is required at the time of bid submission (per each project) ❑ is NOT required for this project. 2. Performance and Payment bond equal to 100% of the total project: ® SHALL be required prior to contracting with the successful bidder. Alternative security instruments will be considered under City Code. (Per each project) ❑ SHALL NOT be required for this project. Prevailing Wage Rates & Local ® SHALL be applied. (For only those parking garages Workforce Program Requirements whose projects costs exceed $1,000,000:)— Please reference Section 0200 and For example, if Bidder providesa construction cost in the Appendix C for detailed information. following format: 1-17th Street Parking Garage: $ 800,000.00 2-12th Street Parking Garage: $ 300,000.00 3-16th Street Parking Garage: $1,700,000.00 • 4-1755 Meridian Street Parking Garage: $ 1,500,000.00 The prevailing wages will be applied only to parking garages 3 and 4. El SHALL NOT be applied unless project cost exceeds $1,000,000 for a covered project. BID NO:2018-232-ZD CITYOF MIAMI BEACH AA AM1BEACH 3 Project Completion Timeframe: 17th Street Parking Garage: 150 calendar days, Substantial Completion 30 calendar days, Final Completion (after substantial completion) 12th Street Parking Garage: 90 calendar days, Substantial Completion 30 , calendar days, Final Completion (after substantial completion) 16th Street Parking Garage: 150 calendar days, Substantial Completion 30 calendar days, Final Completion (after substantial completion). 1755 Meridian Street Parking Garage: 150 calendar days, Substantial Completion 30 ' calendar days, Final Completion (after substantial completion) Liquidated Damages: $500,00 shall be assessed for each day after -Substantial Completion that the Work is not complete. Procurement Contact Information: Zuleika Davidson , Contracting Officer/ Phone: 305.673.7000 ext. 7490 E-mail: zuleikadavidson(a miamibeachfl.00v CONE OF SILENCE: Pursuant to Section 2-486 of the City Code, all procurement solicitations once advertised and until an award recommendation has been forwarded to the City Commission by the City Manager are under the "Cone of Silence." The Cone of Silence ordinance is available at htto://library.municode.comrndex.asox?clientlD=13097&statelD=9&statename=Florida. Any communication or inquiry in reference to this solicitation with any City employee or City official is strictly prohibited with the of exception communications with the Procurement Director, or his/her ,administrative staff responsible for administering the procurement process for this solicitation providing said communication is limited to matters of process or procedure regarding the solicitation. Communications regarding this solicitation are to be submitted in writing to the Procurement Contact named herein with a copy to the City Clerk at rafaelgranado(cr�miamibeachfl.gov. NOTIFICATIONS AND AMENDMENTS: Bid Notifications and Amendments are issued through the City's partnership with Public Purchase. To ensure receipt of all amendments to this bid, please make sure that your company is registered at: www.publicpurchase.com BID NO: 2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 4 TABLE OF CONTENTS SOLICITATION SECTIONS PAGE 0100 DEFINITIONS 6 0200 INSTRUCTIONS TO BIDDERS 9 0300 MINIMUM QUALIFICATIONS AND REQUIREMENTS 14 0400 BID SUBMITTAL REQUIREMENTS & FORMAT 15 0500 GENERAL TERMS AND CONDITIONS 18 APPENDICES: PAGE APPENDIX A PRICE FORM, BID TENDER FORM, & SUPPLEMENTS 53 APPENDIX B LIST OF PLANS AND SPECIFICATIONS 84 APPENDIX C REQUIRED FORMS FOR BID SUBMITTAL 86 APPENDIX D REQUIRED.FORMS (POST-AWARD) 96 APPENDIX E SAMPLE CONTRACT 108 APPENDIX F SPECIFICATIONS 117 BID NO: 2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 5 0100 DEFINITIONS: 1. Definitions: Whenever the following terms or pronouns in place of them appear in the Project Manual, the intent and meaning shall be interpreted as follows: 1.1 Bid: shall refer to any offer(s) submitted in response to this ITB. The terms "Bid" and "Bid Submittal" are used interchangeably. 1.2 Bidder: Any individual, firm, or corporation submitting a bid for this Project, acting directly or through a duly authorized representative. 1.3 Change Order: A written document ordering a change in the Contract Price or Contract Time or a material change. 1.4 City: The City (or Owner) shall mean the City of Miami Beach, a Florida municipal corporation, having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 33139, which is a party hereto and /or for which this Contract is to be performed. In all respects hereunder, City's performance is pursuant to City's position as the owner of a construction project. In the event City exercises its regulatory authority as a governmental body, the exercise of such regulatory authority and the enforcement of any rules, regulations, laws and ordinances shall be deemed to have occurred pursuant to City's regulatory authority as a governmental body and shall not be attributable in any manner to City as a party to this Contract. 1.5 City Commission: City Commission shall mean the governing and legislative body of the City. • 1.6 City Manager: City Manager shall mean the Chief Administrative Officer of the City. 1„7 • Consultant: shall refer to a Registered Architect and/or Licensed Professional Engineer that has been contracted by the City to provide professional services for this project. 1.8 Contract: The part or section of the Contract Documents addressing some of the rights and duties of the parties hereto, including but not limited to contract time and liquidated damages. 1.9 Contract Administrator: The City's Contract Administrator shall mean the individual appointed by the City Manager who shall be the City's authorized representative to coordinate, direct, and review on behalf of the City, all matters related to the Project. The City's Contract Administrator for the Project shall be the Capital Projects Coordinator. 1.10 Contract Documents: The official documents setting forth bidding information, requirements and contractual obligations for the project and includes the Contract, - Invitation to Bid, Scope of Work, Instructions to Bidders, Supplements, Technical Specifications, Exhibits, Certificated, Closeout Forms, General Conditions, Supplementary Conditions, Plans, Drawings, Addenda, Award by the City Commission, Bonds, Notice of Award, Notices to Proceed, Purchase Order(s), Change Order(s), Field Order(s), Supplemental Instructions, and any additional documents the submission of which is required by the Project. BID NO: 2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 6 " I 1 • 1.11 Contract Price: The original amount established in the Bid Submittal and award by the City, as may be amended by Change Order. 1.12 Contract Time: The original time between commencement and completion, including any milestone dates thereof, established in Article 2 of the Sample Contract (Appendix E, attached), as may be amended by Change Order. 1.13 Contractor: The person or entity with whom the City has contracted and who is responsible for the acceptable performance of the Work and for the payment of all legal debts pertaining to the Work. All references in the Contract Documents to third parties under contract or control of Contractor shall be deemed to be a reference to Contractor. 1.14 Field Order: A written order which orders minor changes in the Work but which does not involve a change in the Contract Price or Contract Time. 1.15 Final Completion: The date certified by Consultant in the Final Certificate of 'Payment upon which all conditions and requirements of any permits and regulatory agencies have been satisfied; any documents required by the Contract Documents have been received by Consultant; any other documents required to be provided by Contractor have been received by Consultant; and, to the best of Consultant's knowledge, information, and belief, the Work defined herein has been fully completed in,accordance with the terms and conditions of the Contract Documents. 1.16 Materials: Materials incorporated in this Project, or used or consumed in the performance of the Work. 1.17 Notice(s) to Proceed: Written notice to Contractor authorizing the commencement of the activities identified in the notice or as described in the Contract Documents. • 1.18 Owner's Contingency:" The Owner's Contingency is to cover construction related cost which were not specifically foreseeable or quantified as of the date of Bid submittal, including but not limited to the following: correction of minor defects or omissions in the Work not caused by the Contractor's negligence; cost overruns due to the default of any subcontractor or supplier; minor changes caused by unforeseen or concealed site conditions; and minor changes in the Work not involving. adjustment in the Contractor Price or extension of the completion date and not inconsistent with the approved final plans and specifications. The Owner's Contingency is to be used solely at the discretion of the City. Prior approval by the City shall be required for the use of Owner's Contingency. 1.19 Plans and/or Drawings: The official graphic representations of this Project which are a part of the Contract Documents. 1.20 Program Manager: Not applicable. 1.21 Project: The construction project described in the Contract Documents, including the Work described therein. 1.22 Project Initiation Date: The date-upon which the Contract Time commences. 1.23 Resident Project Representative: Not applicable. BID NO:2018-232-ZD CITYOF MIAMI BEACH MIA MI BEACH 7 1.24 Responsible Bidder: An offeror who has the capability in all respects to perform fully the contract requirements, and the integrity and reliability which will assure good faith performance. 1.25 Responsive Bidder: A person or entity who has submitted a bid which conforms in all material respects to a solicitation. A bid or proposal of a Responsive Bidder must be submitted on the required forms, which contain all required information, signatures, notarizations, insurance, bonding, security, or other mandated requirements by the bid documents to be submitted at the time of bid opening. 1.26 Subcontractor: A person or entity having a direct contract with Contractor including one who furnishes material worked to a special design according to the Contract Documents, but does not include one who merely furnishes Materials not so worked. 1.27 Substantial Completion: The date certified in writing by Consultant, and as fully determined by the Contract Administrator in his/her sole discretion the work, or a portion thereof, is at a level of completion in substantial compliance with the Contract Documents such that all conditions and requirements of permits and regulatory agencies have been satisfied and the Work is sufficiently complete in accordance with the Contract Documents so the Project is available for beneficial occupancy by City. A Certificate of Occupancy or Certificate of Completion and/or other authorization from the City acceptable to Contract Administrator must be issued for Substantial Completion to be achieved; however, the issuance of a Certificate of Occupancy or Certificate of Completion or the date thereof are not to be determinative of the achievement or date of Substantial Completion. 1.28 Surety: The surety company or individual which is bound by the performance bond and payment bond with and for Contractor who is primarily liable, and which surety company or individual is responsible for Contractor's satisfactory performance of the work under the contract and for the payment of all debts pertaining thereto in accordance with Section 255.05, Florida Statutes. 1.29 Work: The construction and services required by the Contract Documents, whether completed or partially completed, and includes all other labor, materials, equipment and services provided or to be provided by Contractor to fulfill Contractor's obligations. The Work may constitute the whole or a part of the Project. Balance of Page Intentionally Left Blank BID NO:2018-232-ZD CITYOF MIAMI BEACH Aty1BEACHi 8 0200 INSTRUCTIONS TO BIDDERS: 1. General: The following instructions are given for the purpose of guiding Bidders in properly preparing their bids. Such instructions have equal force and weight with other portions of the Contract Documents and strict compliance is required with all the provisions contained in the instructions. Bidders shall note that various paragraphs within these bid documents have a box ( ❑ ) which may be checked ( n ). If the box is checked, the language is made a part of the bid documents and compliance therewith is required of the Bidder; if the box is not checked, the language is not made a part of the bid documents. 2. Background and Scope of Work: Parking garage decks, especially the top floor, due to expansion and contraction develop cracks, which with time get larger and allow water to penetrate the concrete and oxidize the rebars which with time the concrete explodes. Continuous monitoring and maintenance to upkeep the parking garage is crucial. Thus, the City seeks proposals from, construction firms to provide the traffic coating services necessary for the 1755 Meridian Ave Parking Garage, 17th Parking Garage, 16th Parking garage, and the'12th Street parking garage. 'Contractor needs to provide the complete "traffic coating" services, as per instructions in "Division 7 of Sikalastic 22" for the 12th & 16th St parking garages and Division 7 of Sikalastic 720-745 for the 17th St& 1755 parking garages, which includes but is not limited to: • Complete removal of the old waterproofing system. • Complete removal of deck joints. • Cleaning of concrete decks. Removal of dust, oil, grease, etc.as per Section 3.01 of the Sika specifications included herein as Appendix F. • Concrete deck repair including: slab damage, cracks preparation & filling, caulking removal & replacement. • Complete Waterproof system of all decks (as noted above), including: primer, base coats & top coat(dark gray in color or approved equal), using "Sika.Concrete Restoration Systems" or approved equal, as specified for each garage. • Automobile bumpers need to be removed before waterproofing process is started. • Coordinate with the City the waterproofing & stripping process, to allow access and partial use of the garage while worked is being performed (i.e. 1/2 of travel area + parking spaces in same side). • Re-striping of the parking spaces will be required one (1) day upon completionto include directional arrows and stop bars with water based paint using Sherwin Williams Pro-Park Waterborne Traffic Marking Paint or approved equal. 3. Abbreviations and Symbols: The abbreviations used throughout the Contract Documents are defined hereinafter in the Technical Specifications. The symbols used in the Plans are defined therein. 4. Examination of Contract Documents and Site: It is the responsibility of each Bidder before submitting a Bid, to: 4.1 Examine the Contract Documents thoroughly. 4.2 Visit the site or structure to become familiar with conditions that may affect costs, progress, performance or furnishing of the Work. 4.3 Take into account federal, state and local (City and Miami-Dade County) laws, regulations, permits, and ordinances that may affect costs, progress, performance, furnishing of the Work, or award. BID NO: 2018-232-ZD CITYOF MIAMI BEACH MIAMIBEACH 9 4.4 Study and carefully correlate Bidder's observations with the Contract Documents. 4.5 Carefully review the Contract Documents and notify Consultant of all conflicts, errors or discrepancies in the Contract Documents of which Bidder knows or reasonably should have known. The submission of a Bid shall constitute an incontrovertible representation by Bidder that Bidder has complied with the above requirements and that without exception, the Bid is premised upon performing and furnishing the Work required by the Contract Documents and that the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. 5. Location of Work:.This Scope of Work shall be completed at the following location: • 512- 12`h St., Miami Beach, FL 33139 • 100- 16th St. Miami Beach, FL 33139 • 1755 Meridian Ave. Miami Beach, FL 33139 • 640- 17th St. Miami Beach, FL 33139, 6. Pre-Bid Interpretations: Only questions answered by written Addenda will be binding and may supersede terms noted in this ITB. Oral and other interpretations or clarifications will be without legal effect. All questions about the meaning or intent of the Contract Documents are to be directed to the City's Procurement Director in writing. Interpretations or clarifications considered necessary by'the City's Procurement Director in response to such,questions will be issued by City by means of Addenda mailed or delivered to all parties recorded by the City's Procurement Director as having received the Bidding Documents. Written questions should be received no less than ten (10) calendar days prior to the date of the opening of Bids. There shall be no obligation on the part of City or the City's Procurement Director to respond to questions received less than ten (10) calendar days prior to bid opening. 7. Printed Form of Bid: All bids must be made'upon the blank Bid/Tender Form included herein and must give the price in strict accordance with the instructions thereon. The bid must be signed and acknowledged by the Bidder in accordance with the directions on the bid form. 8. Prevailing Wage Rates & Local Workforce Participation: Chapter 31, Articles II and III, of the Code of City of Miami Beach.requires that the rate of wages and fringe benefits, or cash equivalent, for all laborers, mechanics and apprentices employed by any contractor or subcontractor on the work covered by the contract, shall not be less than the prevailing rate of wages and fringe benefit payments or cash equivalence for similar skills or classifications of work, as established by the Federal Register last published by the United States Department of Labor prior to the date of issuance of this solicitation. Additionally, the contractor will make its best reasonable efforts to promote employment opportunities for Miami-Dade County residents by seeking to achieve a project goal of having thirty percent (30%) of all.construction labor hours performed by Miami-Dade County residents. The contractor shall also make its best reasonable efforts to promote employment opportunities for Miami Beach residents. Refer to Appendix.C for additional information and requirements of these programs. 9. Acceptance or Rejection of Bids: The City reserves the right to reject any or all bids prior to award. ' Reasonable efforts will be made to either award the Contract or reject all bids within one-hundred twenty (120) calendar days after bid opening date. A Bidder may not withdraw its bid unilaterally nor change the Contract Price before the expiration of one hundred and twenty ' (120) calendar days from the date of bid opening. A Bidder may withdraw its bid after the expiration of one hundred twenty (120) calendar days from the date of bid opening by delivering • BID NO:2018-232-ZD CITYOF MIAMI BEACHMIAMI BEACH 10 written notice of withdrawal to the Procurement Department prior to award of the Bid by the Mayor and City Commission. 10. Method of Award: The City Commission shall award the contract to the lowest and best bidder. The "lowest and best bidder" shall be defined as the lowest, responsive, and responsible bidder. In determining the lowest and best bidder, and in addition to price, Section 2-369 of the City Code provides that the City may consider the following: a. The ability, capacity and skill of the bidder to perform the Contract. b. Whether the bidder can perform the Contract within the time specified, without delay or interference. c. The character, integrity, reputation, judgment, experience and efficiency of the bidder. d. The quality of performance of previous contracts. e. The previous and existing compliance by the bidder with laws and ordinances relating to the Contract. 11. Contract Price: The Contract Price is to include the furnishing of all labor, materials, equipment including tools, shoring, services, permit fees, applicable taxes, overhead and profit for the completion of the Work except as may be otherwise expressly provided in the Contract Documents. The cost of any item(s) of Work not covered by a specific Contract unit price or lump sum price shall be included,in the Contract unit price or lump sum price to which the item(s) is most applicable. 12. Postponement of Date for Presenting and Opening Bids: The City reserves the right to postpone the 'date for receipt and opening of bids and will make a reasonable effort to give at least five (5) calendar days written notice of any such postponement to all prospective Bidders. 13. Protested Solicitation Award: Protests concerning the bid specifications, requirements, and/or terms; or protests after the bid opening date in accordance with City Code Section 2-371, which establishes procedures for protested bids and proposed awards. Protests not submitted in a timely manner pursuant to the requirements of City Code Section 2-371 shall be barred. 14. Veteran Business Enterprises: Pursuant to City of Miami Beach Ordinance No. 2011-3748, the City shall give a preference to a responsive and responsible bidder which is a small business concern owned and controlled by a veteran(s) or which is a service-disabled veteran business enterprise, and which is within five percent. (5%) of the lowest and best bidder, by providing such bidder an opportunity of providing said goods or contractual services for the lowest responsive bid amount. Whenever, as a result of the foregoing preference, the adjusted prices of two (2) or more bidders which are a small business concern owned and controlled by a veteran(s) or a service-disabled veteran business enterprise constitute the lowest bid pursuant to an ITB or oral or written request for quotation, and such bids are responsive, responsible and otherwise equal with respect to quality and service, then the award shall be made to the service- disabled veteran business enterprise. 15. Equal Benefits Ordinance: Bidders are advised that this Bid and any contract awarded pursuant to this procurement process shall be subject to the applicable provisions of Ordinance No. 2005-3494, entitled "Requirement for City Contractors to Provide Equal Benefits for Domestic Partners (the "Ordinance")." The Ordinance applies to all employees of a Contractor who work within the City limits of the City of Miami Beach, Florida; and the Contractor's employees located in the United States, but outside of the City of Miami Beach limits, who are directly performing work on the contract within the City of Miami Beach. BID NO:2018-232-ZD CITYOF MIAMI BEACH MIAMiBEACH 11 Bidders shall complete and return, with their bid, the "Declaration: Non-discrimination in Contracts and Benefits" form contained herein. The City shall not enter into any contract unless the Bidder certifies that such firm does not discriminate in the provision of Benefits between employees with Domestic Partners and employees with spouses and/or between the Domestic Partners and spouses of such employees. Contractors may also comply with the Ordinance by providing an employee with the Cash Equivalent of such Benefit or Benefits, if the City Manager or his/her designee determines that the successful Bidder/Contractor shall complete and return the "Reasonable Measures Application" contained herein, and the Cash Equivalent proposed. It is important to note that a Bidder is considered in compliance if bidder provides benefits neither to employees' spouses nor to employees' Domestic Partners. Bidders will find Attachment A-6 in Appendix A of this Solicitation which consists of an. FAQ Section and Required Forms for Bid Submittal. 16. City Manager's Review: After considering the staff recommendation for award, the City Manager shall exercise his due diligence and recommend to the Mayor and City Commission the bid that the City Manager deems to be in the best interest of the City. 17. City Commission Authority: The City Commission shall consider the City Manager's recommendation(s) and, may approve or reject the City Manager's recommendation(s). The City Commission may also reject all bids received. Theselection or approval by the City Commission shall not constitute a binding contract between the City, and the selected or approved bidder(s). A binding contract will exist upon the completion as determined by the Administration, the City Attorney's Office form approving the contract or contracts, and the Mayor and City Clerk or their respective designees signing the contract(s) after the selected or approved bidder(s) has (or have) done so. Only the executed contract(s) will be binding on the contracting parties. 18. CITY OF MIAMI BEACH LICENSES, PERMITS AND FEES: Each license, permit or fee a Contractor will have to pay the City before or during construction or the percentage method or unit method of all licenses, permits and fees REQUIRED BY THE CITY AND PAYABLE TO THE CITY by virtue of this construction as part of the Contract is as follows: The City of Miami Beach will require occupational licenses for Contractors as well as sub-contractors. Licenses, permits and fees which may be required by Miami-Dade County, the State of Florida, or other governmental entities are not included in the above list, but are listed as attached (next page) and included as an allowance in the bid. Occupational licenses from City of Miami Beach firms will be required to be submitted within fifteen (15) days of notification of intent to award. Occupational licenses will be required pursuant to Chapter 205.065 Florida Statutes. NOTE: a) If the Contractor is a State of Florida Certified Contractor the following will be required: 1) Copy of State Contractors Certification BID NO: 2018-232-ZD CITYOF MIAMI BEACH INAlAMI BEACH 12 2) Place of Business Occupational License 3) Liability and Property Damage Insurance Certificate made to City of Miami Beach 4) Workers compensation or the exemption b) If a Dade County Licensed Contractor: 1) Dade Certificate of Competency in the Discipline Licensed 2) Municipal Contractors Occupational License 3) Liability and Property damage Insurance Certificate made to City of Miami Beach 4) Workers Compensation or the exemption NOTE: PLEASE PROVIDE COPIES OF ALL YOUR LICENSES AND CORPORATE CERTIFICATES WITH YOUR BID SUBMITTAL. 19. PERMITS: The CONTRACTOR shall obtain and pay for any permits that may be required for execution of the work. I. CITY OF MIAMI BEACH • Building Permit • Public Works- Right of Way • Waterproofing Roof Permit The successful contractor shall be responsible for obtaining a dewatering permit,from the appropriate agencies if necessary. Balance of Page Intentionally Left Blank BID NO:2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 13 0300 MINIMUM QUALIFICATIONS AND REQUIREMENTS The Minimum Eligibility Requirements for this solicitation are listed below. Bidders that fail to comply with minimum requirements shall be deemed non-responsive and shall not have its bid considered. 1. Bid Guaranty: Bidder shall submit, WITH ITS BID, either an original bid bond executed by a surety company meeting the qualifications for surety companies as specified in Section 0500, General Conditions, or by certified check, cashier's check, Bid Guaranty Form, Unconditional Letter of Credit (Form 00410), treasurer's check or bank draft of any national or state bank (United States), in the amount of 5% of the bid amount, payable to City of Miami Beach, Florida. FAILURE TO INCLUDE THE BID BOND WITH THE BID SUBMITTAL SHALL RESULT IN THE BID BEING DEEMED NON-RESPONSIVE AND NOT BEING CONSIDERED. A PERSONAL CHECK OR A COMPANY CHECK OF A BIDDER SHALL NOT BE DEEMED A VALID BID SECURITY. Security of the successful Bidder shall be forfeited to the City of Miami Beach as liquidated damages, not as a penalty, for the cost and expense incurred should said Bidder fail to execute the Contract, provide the required Performance Bond, Payment Bond and Certificate(s) of Insurance, within fifteen (15) calendar days after notification of the award of the Contract, or failure to comply with any other requirements set forth herein. Bid Securities of the unsuccessful Bidders will be returned after award of the Bid by the Mayor and City Commission. ANY BID THAT DOES NOT INCLUDE, WITH THE BID, A BID BOND SHALL BE DEEMED NON-RESPONSIVE AND SHALL NOT BE CONSIDERED. 2. Licensing Requirements: Bidder shall be State of Florida Licensed by the Division of Business and Professional Regulations or Certified Miami Dade County General Contractor to be considered for award. The qualified bidder shall hold all required certified licenses at the time of the bid and throughout the term of the project in order to provide the scope of work as set forth in the bid documents. Balance of Page Intentionally Left Blank BID NO:2018-232-ZD CITYOF MIAMI BEACH MI AM BEACH 14 0400. BID SUBMITTAL REQUIREMENTS AND FORMAT One original Bid Proposal g p (preferably in 3-ring binder) must be submitted in an opaque, sealed envelope or container on or before the due date established for the receipt of bids. Additionally, two (2) bound copy and one (1) electronic format (CD or USB format) are to be submitted. The following information should be clearly marked on the face of the envelope or container in which the bid is submitted: Bid Number, Bid Title, Bidders Name, and Bidder Return Address. Bids received electronically, either through email or facsimile, are not acceptable and will be rejected. The City reserves the right to request any documentation omitted, with exception of the Bid Price form and Bid Bond (if applicable). Bid Submittals received with no Bid Price or Bid Bond (if applicable) shall be deemed non-responsive. Bidder must submit any other omitted documentation within two (2) business days upon request from the City, or the bid may be deemed non-responsive. Non-responsive bid packages will receive no further consideration. BID SUBMISSION FORMAT: Bid packages must contain the following information and documents, each fully completed, signed, and notarized (as required) in the order dictated below. Bid packages which do not include all required documentation, or are not submitted in the required format, or do not have the appropriate signatures or notarizations on each document, may be deemed non-responsive. Tab A. IDENTIFICATION PAGE AND TABLE OF CONTENTS 1. Bidder shall provide a Cover Page including the following information: • Name of Bidder. • ,Address of submitting Bidder. • E-mail address for the appropriate contact person at the submitting company. ■ Phone number and facsimile number of submitting Bidder. • Federal Tax Identification Number for submitting Bidder. • Declaration regarding company'( organization, whether as Corporation, Partnership, or other. (Note: if co venture, specify) • Signature of an officer or other individual of the submitting Bidder who has the authority to bind said Bidder. • Printed name of the authorized signing officer or other individual. • Title of the authorized signing officer. ■ Date.of signature'. 2. Table of Contents. Tab B. MINIMUM QUALIFICATIONS AND REQUIREMENTS Bidders shall provide evidence indicating compliance with the minimum requirement(s) of this ITB,'as further detailed in Section 0300 Minimum Requirements. Tab C. FINANCIAL STATEMENTS 1. D&B Suppler Evaluation Report. Upon the request of City Administration after a Bid has been submitted, the lowest and best Bidder shall pay D&B to send the Supplier Qualifier Report (SQR) to the prospective Bidder and the Department through electronic means. The cost of the preparation of the D&B report shall be the responsibility of the prospective Bidder. The prospective Bidder shall request the report from D&B at the following website: BID NO: 2018-232-ZD CITYOF MIAMI BEACH BEACH 15 httosalsuoolierportal.drib.corn/webappfwcs/storesfservtetlSuppl ierPorta l?storeld=1169 6 BIDDERS SHOULD NOT INCLUDE SQR REPORTS WITH THEIR. BID SUBMITTALS. Financial Capacity shall only be evaluated for the lowest and best ,bidder to determine the responsibility of that contractor. Bidders shall submit SQR Reports electronically directly to the Procurement Contact listed herein upon request. 2. In addition to the D&B information, the City may require that proposers submit financial statements for each of their last two complete fiscal years within ten (10) calendar days, upon written request. Such statements should include, as a minimum, balance sheets (statements of financial position) and statements of profit and loss (statement of net income). When the submittal is from a co-venture,,each' Proposers involved in the co-venture must submit financial statements as indicated above. Tab D. PREVIOUS EXPERIENCE, QUALIFICATIONS AND KEY PERSONNEL It is a requirement of the bid that the Bidder staff the project with competent individuals and qualified supervisory personnel. To that end, the Bidder shall provide the following information: • Bidder (Business Entity) shall demonstrate the Contractor Team's (i.e., General Contractor, sub-contractors, and key personnel) ability to execute the type of work described within the Contract Documents of this Invitation to Bid. • An organizational chart listing the proposed key personnel, their qualifications and their roles in the project, resumes which shall include educational background, work experience, employment history, and any other pertinent information. Where applicable,. Bidder team members shall also submit current and valid certifications and/or licenses for their individual scope of supervision. At a minimum, the bidder shall include the following proposed project team members: ■ Construction Project Manager ■ Construction Superintendent • Site Foreman and/or Estimator • A staffing plan that clearly illustrates the key elements of the proposed,organizational structure. The staffing plan should indicate the availability of the personnel proposed to work on the Project. The staffing plan should also indicate the name of the individual who will serve as the primary contact with City. Bidder shall clearly detail the role of all sub-contractors proposed for the Project. • Previous Experience: Bidders should have a total of two (2) projects successfully completed of similar size and scope within the last five (5) years. Submittal Requirement: Please provide at least two (2) individual project references exemplifying. bidders' experience for projects involving the repair and/or restoration of parking garage decks for which a waterproofing system was applied. References are to include projects completed within the last five (5) years. For all references submitted, please submit, with its bid or within two '(2) business days of request, at a minimum the following information for each project reference: 1) Firm Name, 2) Contact Individual Name &Title, 3) Address, 4) Telephone number, 5) BID NO:2018-232-ZD CITYOF MIAMI BEACH MIAMIBEACH 16 Contact's Email, 6) Narrative on Scope of Services Provided, 7) Contract amount and completion date. • Manufacturer Certification: Bidder shall be a certified applicator of the proposed manufacturer. The City may require proof that the bidder is certified by the manufacturer as an applicator and that the bidder has been trained and approved in the handling, mixing, and application of the products to be used. Tab E. BID PRICE Bidders are required to submit their bid price using the Invitation to Bid Proposal Price Form found in Appendix A, Attachment A-1. Attach Appendix A Price Form, Bid Tender Form, & Supplements fully completed and executed. FAILURE TO SUBMIT THE MOST RECENT BID PROPOSAL FORM (EITHER INCLUDED IN.THE ORIGINAL ITB OR RELEASED VIA AN ADDENDUM MAY RESULT IN BID BEING DEEMED NOT RESPONSIVE AND NOT BEING FURTHER CONSIDERED. Balance of Page Intentionally Left Blank BID NO:2018-232-ZD CITYOF MIAMI BEACH MIAMEBEACF'6 17 0500. GENERAL TERMS AND CONDITIONS: 1. Personnel Requirements: Superintendent must have at least five (5) years of experience in projects of similar design, scope, size and complexity. The Project Manager must have at least five (5) years of experience in projects of similar design, scope, size and complexity. 2. Proiect Manual: 2.1. The Project Manual includes any general or special Contract conditions or specifications attached hereto. 2.2. The Project Manual, along with all documents that make up and constitute the Contract Documents, shall be followed in strict accordance as to work, performance, material, and dimensions except when Consultant may authorize, in writing, an exception. 2.3. Dimensions given in figures are to hold preference over scaled measurements from the drawings; however, all discrepancies shall be resolved by Consultant. Contractor shall not proceed when in doubt as to any dimension or measurement, but shall seek clarification from Consultant. 2.4. Contractor shall be furnished three (3) copies, free of charge, of the Project Manual; two of which shall be preserved and always kept accessible to Consultant and Consultant's authorized representatives. Additional copies of the Project Manual may be obtained from City at the cost of reproduction. 3. Intention of City: It is the intent of City to describe in the Contract Documents a functionally complete Project (or part thereof) to be constructed in accordance with the Contract Documents and in accordance with all codes and regulations governing construction of the Project. Any work, materials or equipment that may reasonably be inferred from the Contract Documents as being required to produce the intended result shall be supplied by Contractor whether or not specifically called for. When words which have a well-known technical or trade meaning are used to describe work, materials or equipment, such words'shall be interpreted in accordance with that meaning. Reference to standard specifications, manuals, or codes of any technical society, organization or association, or to the laws or regulations of any governmental authority, whether such reference be specific or by'implication, shall mean the latest standard specification, manual, code or laws or regulations in effect at the time of opening of bids and Contractor shall comply therewith. City shall have no duties other than those duties and obligations expressly/set forth within the Contract Documents.. 4. Preliminary Matters: 4.1. Within five (5) calendar days prior to the pre-construction meeting described in Section 4.2, Contractor shall submit to Consultant for Consultant's review and acceptance: ti 4.1.1 ,A project "Base Line" schedule, one r(1) copy on a CD and One (1) hard copy (activities arranged in "waterfall"), in theindicated form for Final review and approval: () Bar Chart () Modified CPM () CPM (X) Computerized CPM using Primavera P6 software or latest version Microsoft Project software BID NO:2018-232-ZD CITYOF MIAMI BEACH Pv1iA: IBEACH 18 (CPM shall be interpreted to be generally as outlined in the Association of General Contractors (AGC) publication, "The Use of CPM in Construction.") CONTRACTOR shall provide a preliminary man loaded, Iogic based "Base Line" Project schedule using "Early Start" and "Early Finish" dates for each activity. The Contractor shall include, in addition to normal work activity input, input that encompasses all submittal approvals, delivery durations for important materials and/or equipment, and Logic relationships of activities including physical and site restraints. This input shall be,precedence based CPM scheduling using the most recent version of Primavera P6 software. The preliminary Base Line project schedule when submitted shall have • attached a run of the programs generated error report that states no errors and be acceptable to CONSULTANT. Monthly, CONTRACTOR shall submit with each progress application an update of the Project Schedule with an error report stating no errors (that does not revise the base line schedule), showing the progress for the month. CONTRACTOR SHALL SUBMIT ONE HARD COPY AND ONE ELECTRONIC COPY (including a native version and a pdf). In addition to the Progress Schedule CONTRACTOR shall include a narrative report of the months' progress, an explanation of any delays and or additions/deletions to. activities. It is .strongly recommended that CONTRACTOR or the professional who performs scheduling have a vast knowledge in the use of Primavera P6, to develop and update the proiect schedule. CONTRACTOR agrees to attend weekly progress meetings and provide an updated (3) week look ahead schedule for review and discussion and monthly be prepared to discuss any: 1) Proposed changes to the Base Line schedule logic; 2) Explain and provide a narrative for reasons why logic changes should be made; 3) Update to individual subcontractor activities; and 4) Integration of changes into the schedule. The Project Schedule shall be the basis of the CONTRACTOR'S work and shall be complied with in all respects. If CONTRACTOR'S Work becomes more than (30) days behind schedule CONTRACTOR shall be required to submit a "Make-Up" schedule to CONTRACT ADMINISTRATOR for review and acceptance that demonstrates "Catch Up" within seven (7) days. CONTRACTOR shall provide, at CONTRACTOR'S cost, the necessary additional labor and or equipment necessary to make-up the lost time. Failure to provide a "Make-Up" schedule or vigorously follow the "Make-Up" schedule shall be reason to default CONTRACTOR. 4.1.2 Not Used. BID NO: 2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 19 4.1.3 A preliminary schedule of Shop Drawing submissions; and 4.1.4 In a lump sum contract or in a contract which includes lump sum bid items of Work, a preliminary schedule of values for all of the Work which may include quantities and prices of items aggregating the Contract Price and will subdivide the Work into component parts in sufficient detail to serve as the basis for progress payments during construction. Such prices will include an appropriate amount of overhead and profit applicable to each item of work whichwill be confirmed in writing by Contractor at the time of submission. Such prices shall be broken down to show labor, equipment, materials and _ overhead and profit: 4.1.5 After award but-prior to the submission of the progress schedule, Consultant, Contract Administrator and Contractor shall meet with all utility owners and secure from them a schedule of utility relocation, provided, however, neither Consultant nor City shall be responsible for the nonperformance by the utility owners. 4.2. At a time specified by Consultant but before Contractor starts the work at the Project site, a conference attended by Contractor, Consultant and others as deemed appropriate by Contract Administrator will be held to discuss the schedules to discuss procedures for handling Shop Drawings and other submittals and for processing Applications for Payment, and to establish a working understanding among the parties as to the Work. 4.3. Within five (5) days from the Project Initiation Date set forth in the Notice to Proceed, a conference attended by Contractor, Consultant and others, as appropriate, will be held to finalize the schedules submitted. Within ten (10) days after the Project Initiation.Date set forth in Notice to Proceed, the Contractor shall revise the original schedule submittal to address all review comments from the CPM. review conference and resubmit for Consultant review. The finalized progress schedule will be accepted by Consultant only as providing an orderly progression of the Work to completion within the Contract Time, but such acceptance shall not constitute,acceptance by City or Consultant of the means or methods of construction or of the sequencing or scheduling of the Work, and such acceptance will neither impose on Consultant or City responsibility for the progress or scheduling of the Work nor relieve Contractor from full responsibility therefore. The finalized schedule of Shop Drawing submissions must be acceptable to Consultant as providing a workable arrangement for processing the submissions. The finalized schedule of values must be acceptable to Consultant as to form and substance. 5. Performance Bond and Payment Bond: Within ten (10) calendar days of being notified of the award, Contractor shall furnish a Performance Bond and a Payment Bond containing all the provisions of the Performance. Bond and Payment Bond attached hereto in Appendix D. 5.1. Each Bond shall be in the amount of4one hundred percent (100%) of the Contract Price guaranteeing to City the completion and performance of the work covered in such Contract as well as full payment of all suppliers, laborers, or subcontractors employed pursuant to this Project. Each Bond shall be with a surety company which is qualified pursuant to Article 6. BID NO: 2018-232-ZD CITYOF MIAMI BEACH � Ant(BEACH 20 5.2. Each Bond shall continue in effect for one year after Final Completion and acceptance of the work with liability equal to one hundred percent (100%) of the Contract sum, or an additional bond shall be conditioned that Contractor will, upon notification by City, correct any defective or faulty work or materials which appear within one year after Final Completion of the Contract. 5.3. Pursuant to the requirements of Section 255.05(1)(a), Florida Statutes, as may be amended from time to time, Contractor shall ensure that the bond(s) referenced above shall be recorded in the public records of Miami-Dade County and provide City with evidence-of such recording. 5.4. Alternate Form of Security: In lieu of a Performance Bond and a Payment Bond, Contractor may furnish alternate forms of security which may be in the form of cash, money order, certified check, cashier's check or unconditional letter of credit in the form attached hereto in Appendix D. Such alternate forms of security shall be subject to the prior approval of City and for same purpose and shall be subject to the same conditions as those applicable above and shall be held by City for one year after completion and acceptance of the Work. 6. Qualification of Surety 6.1. Bid Bonds, Performance Bonds and Payment Bonds over Five Hundred Thousand Dollars ($500,000.00): 6.1.1. Each bond must be executed by a surety company of recognized standing, authorized to do business in the State of Florida as surety, having a resident agent in the State of Florida and having been in business with a record of successful continuous operation for at least five (5) years. 6.1.2. The surety company shall hold a current certificate of authority as acceptable surety on federal bonds in accordance with United States Department of Treasury Circular 570, Current Revisions. If the amount of the Bond exceeds the underwriting limitation-set forth in the circular, in order to qualify, the net retention of the surety company-shall not exceed the-underwriting limitation in the circular, and the excess risks must be protected by coinsurance, reinsurance, or other methods in accordance with Treasury Circular 297, revised September 1, 1978 (31 DFR Section 223.10, Section 223.111). Further, the surety company shall provide City with evidence satisfactory to City, that such excess risk has been protected in an acceptable manner. 6.1.3. The City will accept a surety bond from a company with a rating of B+ or better for bonds up to $2 million, provided, however, that if any surety company appears on the watch list that is published quarterly by Intercom of the Office of the Florida Insurance Commissioner, the City shall review and either accept or reject the surety company based on the financial information available to the City. A surety company that is rejected by the City may be substituted by the Bidder or proposer with a surety company acceptable to the City, only if the bid amount does not increase. The following sets forth, in general, the acceptable - parameters for bonds: Policy- Financial BID NO: 2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 21 holder's Size Amount of Bond Ratings Category 500,001 to 1,000,000 B+ Class I 1,000,001 to 2,000,000 B+ Class II 2,000,001 to 5,000,000 A Class III 5,000,001 to 10,000,000 A Class IV 10,000,001 to 25,000,000 A Class V 25,000,001 to 50,000,000 A Class VI 50,000,001 or more A Class VII 6.2. For projects of$500,000.00 or less, City may accept a Bid Bond, Performance Bond and Payment Bond from a surety company which has twice the minimum surplus and capital required by the Florida Insurance Code at the time the invitation to bid is issued, if the surety company is otherwise in compliance with the provisions of the Florida Insurance Code, and if the surety company holds a currentlyvalid certificate of authority issued by the United States Department of the Treasury under Section 9304 to 9308 of Title 31 of the United States Code, as may be amended from time to time. The Certificate and Affidavit so certifying should be submitted with the Bid Bond and also with the Performance Bond and Payment Bond. 6.3. More stringent requirements of any grantor agency are set forth within the Supplemental Conditions. If there are no more stringent requirements, the provisions of this section shall apply. 7. Indemnification 7.1 Contractor shall indemnify, defend, and hold harmless City, its officers, agents, directors, and employees, from liabilities, damages, losses, and costs, including, but not limited to reasonable attorney's fees, to the extent caused by the negligence, recklessness or intentional wrongful misconduct of Contractor and persons employed or utilized by Contractor in the performance of this Agreement. Except as specifically provided herein, this Agreement does not require Contractor to indemnify City, its employees, officers, directors, or agents from any liability, damage, loss, claim, action, or proceeding. This indemnification provision shall survive the term of this Agreement. In the event that any action or proceeding is brought against City by reason of any such claim or demand, Contractor shall, upon written notice from City, resist and defend such action or proceeding by counsel satisfactory to City. 7.2 The Indemnification provided above shall obligate Contractor to defend at its own expense to and through appellate, supplemental or bankruptcy proceeding, or to provide for such defense, at City's option, any and all claims of liability and all suits and actions of every name and description covered by Section 7.1 above which may be brought against City whether performed by Contractor , or persons employed or utilized by Contractor. 8. Insurance Requirements: 8.1 The Bidder shall furnish to the Procurement Department, City of Miami Beach, 1755 Meridian Avenue, 3`'' Floor, Miami, Florida 33139, Certificate(s) of Insurance which indicate that insurance coverage has been obtained which meets the requirements as outlined below: ' BID NO: 2018-232-ZD CITYOF MIAMI BEACH MJAMJgEACH 22 ' - 1 A. Worker's Compensation Insurance as required by Florida, with Statutory limits and Employer's Liability Insurance with limit of no less than $1,000,000 per accident for bodily injury or disease. B. Commercial General Liability Insurance on an occurrence basis, including products and completed operations, contractual liability, property damage, bodily injury and personal & advertising injury with limits no less than $2,000,000 per occurrence. C. , Automobile Liability Insurance covering all owned, non-owned and hired vehicles used in connection with the work, in an amount not less than $2,000,000 combined single limit per occurrence., for bodily injury and property damage. D. Builders Risk Insurance utilizing an "All Risk" coverage form, with limits equal to the completed value of the project and no coinsurance penalty. (City of Miami Beach shall be named as a Loss Payee on this policy, as its interest may appear. This policy shall remain in force until acceptance of the project by the City.) E. Umbrella Liability with limits no less than $10,000,000. The umbrella coverage must be as broad as the primary General Liability coverage. F. Contractors' Pollution Legal Liability (if project involves environmental hazards), with limits no less than $1,000,000 per occurrence or claim, and $2,000,000 policy aggregate. 8.2 Additional Insured Status The City of Miami Beach must be covered as an additional insured with respect to liability arising out of work or operations performed by or on behalf of the Consultant. 8.3 Waiver of Subrogation Contractor hereby grants to City of Miami Beach a waiver of any right to subrogation which any insurer of the Contractor may acquire against the City of Miami Beach by virtue of the payment of any loss under such insurance. Contractor agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not the City of Miami Beach has received a waiver of subrogation endorsement from the insurer. Other Insurance Provisions , 1. For any claims related to this project, the Contractor's coverage shall be primary insurance as respects the City of Miami Beach, its officials, officers, employees, and volunteers. Any insurance or self-insurance maintained by the City of Miami Beach shall be excess of the Contractor's insurance and shall not contribute with it. 2. Each policy required by this clause shall provide that coverage shall not be canceled, except with notice to the City of Miami Beach. 3. If any excavation work is included in the Contract, it is understood and agreed that Contractor's Liability policy shall not contain exclusion for XCU (Explosion, Collapse and Underground) coverage. BID NO:2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 23 If any coverage required is written on a claims-made form: 4. The retroactive date must be shown, and must be before the date of the contract or the beginning of contract work. 5. Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of the contract of work. 6. If coverage is canceled or non-renewed, and not replaced with another claims- made policy form with a retroactive date prior to the contract effective date, the Contractor must purchase extended period coverage for a minimum of five (5) years after completion of the contract work. 7. A copy of the claims reporting requirements must be submitted to the City of Miami Beach Risk Management(or its designee) for review. 8. If the services involved lead-based paint or asbestos identification/remediation, the Contractors Pollution Liability shall not contain lead-based paint or asbestos exclusions. If the services involve mold identification/remediation, the Contractors Pollution Liability shall not contain a mold exclusion and the definition of"Pollution" shall include microbial matter including mold. 8.4 Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best's rating of no less than A:VII, unless otherwise acceptable to the City of Miami Beach. Risk Management Office. 8.5 Verification of Coverage • Contractor shall provide the required insurance certificates, endorsements or applicable policy language effecting coverage required by this Section. All certificates of insurance and endorsements are to be received prior to any work commencing. However, failure to obtain the required coverage prior to the work beginning shall not waive the Contractor's obligation to provide them. The City of Miami Beach reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time. 8.6 Special Risks or Circumstances The City of Miami Beach reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances. BID NO:2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 24 Certificate Holder: CITY OF MIAMI BEACH Go PROCUREMENT DEPARTMENT 1700 CONVENTION CENTER DRIVE MIAMI BEACH, FL 33139 Compliance with the foregoing requirements shall not relieve the vendor of his liability and obligation under this section or under any other section of this agreement. 9. Labor and Materials: 9.1. Unless otherwise provided herein, Contractor shall provide and pay for all materials, labor, water, tools, equipment, light, power, transportation and other facilities and services necessary for the proper execution and completion of the Work, whether temporary or permanent and,whether or not incorporated or to be incorporated in the Work. 9.2. Contractor shall at all times enforce strict discipline and good order among its employees and subcontractors at the Project site and shall not employ on the Project any unfit person or anyone not skilled in the work to which they are assigned. 10. Royalties and Patents: All fees, royalties, and claims for any invention, or pretended inventions,or patent of any article, material, arrangement, appliance, or method that may be used upon or in any manner be connected with the construction of the Work or appurtenances, are hereby included in the prices stipulated in this Contract for said work. 11. Weather: Extensions to the Contract Time for delays caused by the effects of inclement weather shall be submitted as a request for a change in the Contract Time pursuant to Article 40. These time extensions are justified only when rains or other inclement weather conditions or related adverse soil conditions prevent Contractor from productively performing controlling items of work identified on the accepted schedule or updates resulting in: (1) Contractor being unable to work at least fifty percent (50%) of the normal workday on controlling items of work identified on the accepted schedule or - updates due to adverse weather conditions; or (2) Contractor must make major repairs to the Work damaged by weather. Providing the damage was not attributable to a failure to perform or-neglect by Contractor, and providing that Contractor was unable to work at least fifty percent (50%) of the normal workday on controlling items of work identified on the accepted schedule or updates. 12. Permits, Licenses and Impact Fees: 12.1. Except as otherwise provided within the Supplemental Conditions, all permits and licenses required by federal,' state or local laws, rules and regulations BID NO:2018-232-ZD CITYOF MIAMI BEACH /MIAMI BEACH 25 necessary for the prosecution of the Work undertaken by Contractor pursuant to this Contract shall be secured and paid for by .Contractor. It is Contractor's responsibility to have and maintain appropriate Certificate(s) of Competency, valid for the Work to be performed and valid for the jurisdiction in which the Work is to be performed for all persons working on the Project for whom a Certificate of Competency is required. 12.2. Impact fees levied by the City and/or Miami-Dade County shall be paid by • Contractor. Contractor shall be reimbursed only for the-actual amount of the impact fee levied by the municipality as evidenced by an 'invoice or other acceptable documentation issued by the municipality. Reimbursement to Contractor in no event shall include profit or overhead of Contractor. 13. Resolution of Disputes: 13.1 To prevent all disputes and litigation, it is agreed by the 'parties hereto that - Consultant shall decide all'questions, claims, difficulties and disputes of whatever nature which may arise relative to the technical interpretation of the Contract Documents and fulfillment of this Contract as to the character, quality, amount andvalue of any work done and materials furnished, or proposed to be done or furnished under or, by reason of, the Contract Documents and Consultant's estimates and decisions upon all claims, questions, difficulties and disputes shall be final and binding to the extent provided in Section 12.2. Any claim, question, difficulty or dispute which cannot be resolved by mutual agreement of City and Contractor shall be submitted to Consultant in writing within twenty-one (21) calendar days. Unless a different period of time is set forth herein, Consultant shall notify City and Contractor in writing of Consultant's decision within twenty- one (21) calendar days from the date of the submission of the claim, question, difficulty or dispute, unless ..Consultant requires additional time. to gather information or allow the parties to provide additional information. All non- technical administrative disputes shall be determined by the Contract Administrator pursuant to the time periods provided herein. During the pendency of any dispute and after a determination thereof, Contractor, Consultant and City shall act in good faith to mitigate any potential damages including utilization of construction schedule changes and alternate means of construction. 13.2 - In the event thedetermination of a dispute under this Article is unacceptable to either party hereto, the party objecting to the determination must notify the other party in writing within ten (10) days of receipt of the written determination. The notice must state the basis of the objection and must be accompanied by a statement that any Contract Price adjustment claimed is the entire adjustment to which the objecting party has reason to believe it is entitled to as a result of the determination. Within sixty (60) days after Final Completion of the Work, the parties shall participate in mediation to address all objections toany determinations hereunder and to attempt to prevent litigation. The mediator shall be mutually agreed upon by the parties. Should any objection not be resolved in mediation, the parties retain all their legal rights and remedies provided under, State law. A party objecting to a determination specifically waives all of its rights provided hereunder, including its rights and remedies under State law, if said party fails to comply in strict accordance with the requirements of this Article. BID NO:2018-232-ZD CITYOF MIAMI BEACH ,AMI BEACH 26 • 14. Inspection of Work: 14.1. Consultant and City shall at all times have access to the Work, and Contractor shall provide proper facilities for such access and for inspecting, measuring and testing. 14.1.1. Should the Contract Documents, Consultant's instructions, any laws, ordinances, or any public authority require any of the Work to be specially tested or approved, Contractor shall give Consultant timely notice of readiness of the Work for testing. If the testing or approval is to be made by an authority other than City, timely notice shall begiven of the date fixed for such testing. Testing shall be made promptly, and, where practicable,.at the source of supply. If any of the Work should be covered up without approval or consent of Consultant, it must, if required by Consultant, be uncovered for examination and properly restored at Contractor's expense. 14.1.2. Reexamination of any of the Work may be ordered by Consultant with prior written approval by the Contract Administrator, and if so ordered, the Work must be uncovered by Contractor. If such Work is found to be in accordance with the Contract Documents, City shall pay the cost of reexamination and replacement by means of a Change Order. If such Work is not in accordance with the Contract Documents, Contractor shall pay such cost. 14.2. Inspectors shall have no authority to permit deviations from, or to relax any of the provisions of, the Contract Documents or to delay the Contract by failure to inspect the,materials and work with reasonable promptness without the written permissionor instruction of Consultant. 14.3. The payment of any compensation, whatever may be its character or form, or the giving of any gratuity or the granting of any favor by Contractor to any inspector, directly or indirectly, is strictly prohibited, and any such act on the part of Contractor will constitute a breach of this Contract. 15. Superintendence and Supervision: 15.1. • The orders of City are to be given through Consultant, which instructions are to be strictly and promptly followed in every case. Contractor shall keep on the Project during its progress, a full-time competent English speaking superintendent and any necessary assistants, all satisfactory to Consultant. The superintendent shall not be changed except with the written consent of Consultant, unless the superintendent proves to be unsatisfactory to Contractor and ceases to be in its employ. The superintendent shall represent Contractor and all directions given to the superintendent shall be as binding as if given to Contractor and will be confirmed in writing by Consultant upon the written request of Contractor. Contractor shall give efficient supervision to the Work, using its best skill and attention. 15.2. Daily, Contractor's superintendent shall record, at a minimum, the following information in a bound log: the day; date; weather conditionsand how any weather condition affected progress of the Work; time of commencement of work for the day; the work being performed; materials, labor, personnel, equipment BID NO:2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 27 / I and subcontractors at the Project site; visitors to the Project site, including representatives of Consultant; regulatory representatives; any special or unusual conditions or occurrences encountered; and the time of termination of work for the day. All information shall be recorded in the daily log in ink. The daily log shall be kept on the Project site and shall be available at all times for inspection and copying by City and Consultant. 15.3. The Contract Administrator, Contractor and Consultant shall meet at leastweekly or as determined by the Contract Administrator, during the course of the Work to review and agree upon the work performed to date and to establish the controlling itemsof work for the next two weeks. The Consultant shall publish, keep, and distribute minutes and any comments thereto of each such meeting. 15.4. If Contractor, in the course of prosecuting the Work, finds any discrepancy between the Contract Documents and the physical conditions of the locality, or any errors, omissions, or discrepancies in the\ Project Manual, it shall be Contractor's duty to immediately inform Consultant, in writing, and Consultant will promptly review the same. Any work done after such discovery, until authorized, will be done at Contractor's sole risk. 15.5. Contractor shall supervise and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences and procedures of construction. 16. Termination. 16.1. Termination for Convenience. In addition to other rights the City may/have at' law-and,pursuant to the Contract Documents with respect to cancellation and • termination of the Agreement, the City may, in its sole discretion, terminate for the City's convenience the performance of Work under this Agreement, in whole or in part, at any time upon written notice to the Contractor. The City shall effectuate such-Termination for Convenience by delivering to the Contractor a Notice of Termination for Convenience, specifying the applicable scope and effective date of termination, which termination shall be deemed operative as of the effective date specified therein without any further written notices from the City required. Such Termination for Convenience shall not be deemed a breach of the Agreement, and may be issued by the City with or without cause. a. Upon receipt of such Notice of Termination for .Convenience from the City, and except as otherwise directed,by the City, the Contractor shall immediately proceed with the following obligations, regardless of any delay in determining or adjusting any amounts due under this Section 16.1: i. Stop the Work specified as terminated in the Notice of Termination for Convenience; ' ii. Promptly notify all Subcontractors of such termination, cancel all contracts and purchase orders to the extent they relate to the Work terminated to the fullest extent possible and take such other actions as are necessary to minimize demobilization and termination costs for such cancellations; BID NO: 2018-232-ZD CITYOF MIAMI BEACH MIA'Ml BEACH 28 iii. Immediately deliver to the City' all Project records, in their original/native electronic format (i.e. CAD, Word, Excel, etc.), any and all other unfinished documents, and any and all warranties and guaranties for Work, equipment or materials already installed or purchased; iv. If specifically directed by the City in writing, assign to the City all right, title and interest of Contractor under any contract, subcontract and/or purchase order, in which case the City shall have the right and obligation to settle or to pay any outstanding claims arising from said contracts, subcontracts or purchase orders; v. Place no further subcontracts or purchase orders for materials, services, or facilities, except as necessary to complete the portion of 'the Work not terminated (if any) under the Notice of Termination for Convenience; vi. As directed by the City, transfer title and deliver to the City (1) the fabricated and non-fabricated parts, Work in progress, completed Work, supplies and other material produced or required for the Work terminated; and (2) the completed or partially completed Project records that, if this Agreement had been completed, would be required to be furnished to the City; vii. Settle all outstanding liabilities and termination settlement proposals from the termination of any subcontracts or purchase orders, with the prior approval or ratification to the extent required by the City (if any); viii. Take any action that may be necessary, or that the City may direct, for the protection and preservation of the Project Site, including life safety and any property related to this Agreement that is in the Contractor's possession and in which the City has or may acquire an interest; and ix. Complete performance of the.Work not terminated (if any). b. Upon issuance of such Notice of Termination for Convenience, the Contractor shall only be entitled to payment for the Work satisfactorily performed up until the date of its receipt of such Notice of Termination for Convenience, but no later than the effective date specified therein. Payment for the Work satisfactorily performed shall be determined by the City in good faith, in accordance with the percent completion of the Work, less all amounts previously paid to the Contractor in approved Applications for Payment, the reasonable costs of demobilization and reasonable costs, if any, for canceling contracts and purchase orders with Subcontractors to the extent such costs are not reasonably avoidable by the Contractor. Contractor shall submit, for the City's review and consideration, a final termination payment proposal with substantiating documentation, including an updated Schedule of Values, within 30 days of the. effective date of termination, -unless extended in writing by the City upon request. Such termination amount shall be mutually agreed upon by the City and the Contractor and absent such agreement, the City shall, noless than fifteen (15) days prior to making final payment, provide the Contractor with written notice of the amount the City intends to pay to the Contractor. Such final BID NO: 2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 29 payment so made to the Contractor shall be in full and final settlement for Work performed under this Agreement, except to the extent the Contractor disputes such amount in a written notice delivered to and received by the City prior to the City's tendering such final payment. 16.2. Event of Default. The following shall each be considered an item of Default. If, after delivery of written notice from the City to Contractor specifying such Default, the Contractor fails to promptly.commence and thereafter complete the curing of such Default within a reasonable period of time, not to exceed thirty (30) days, after the delivery of such Notice of Default, it shall be deemed an Event of Default, which constitutes sufficient grounds for the/City to terminate Contractor for cause: a. Failing to perform any portion of the Work in a manner consistent with the requirements of the Contract Documents or within the time required therein; or failing to use the Subcontractors, entities and personnel as identified and to the degree specified, in the Contract Documents, subject to substitutions approved by the City in accordance with this Agreement and the other Contract Documents; • b. Failing, for reasons other than an Excusable Delay, to begin the Work required promptly following the issuance of a Notice to Proceed; c. Failing to perform the Work with sufficient manpower, workmen and equipment or with sufficient materials, with the effect of delaying the prosecution of the Work in accordance with the Project Schedule and/or delaying completion of any of the Project within the specified time; d. Failing, for reasons other than an Excusable Delay, to timely complete the, Project within the specified time; e. Failing and/or refusing to remove, repair and/or replace any portion of the Work as may be,rejected as defective or nonconforming with the terms and conditions of the Contract Documents; f. Discontinuing the prosecution of the Work, except in the event of: 1) the issuance of a stop-work order by the City; or 2) the inability of the _ Contractor to prosecute the Work because of an event giving rise to an Excusable Delay as set forth in this Agreement for which Contractor has provided written notice of same in accordance with the Contract Documents; g. Failing to provide sufficient evidence upon request that, in the City's-sole opinion, demonstrates the Contractor's financial ability to complete the Project; h. An indictment is issued against the Contractor; i. Failing to make payments to for materials or labor in accordance with the respective agreements; j. Persistently disregarding laws, ordinances, or rules, regulations or orders of a public authority having jurisdiction; BID NO: 2018-232-ZD CITYOF MIAMI BEACH i<AI AMEBEACH 30 k. Fraud, misrepresentation or material misstatement by Contractor in the course of obtaining this Agreement; I. Failing to comply in any material respect with any of the terms of this Agreement or the Contract Documents. In no event shall the time period for curing a Default constitute an extension of the Substantial Completion Date or a waiver of any of the City's rights or remedies hereunder for a Default which is not cured as aforesaid. 16.3. Termination of Agreement for Cause. • • a. The City may terminate the Contractor for cause upon the occurrence of an Event of Default as defined in Section 16.2, or for any other breach of the Agreement or other Contract Documents by the Contractor that the City, in its sole opinion, deems substantial and material, following written notice to the Contractor and the failure to timely and properly cure to the satisfaction of the City in the time period set forth in Section 16.2, or as otherwise specified in the Notice of Default. b. Upon the occurrence of an Event of Default, and without any prejudice to any other rights or remedies of the City, whether provided by this Agreement, the other Contract Documents or as otherwise provided at _law or in equity, the City may issue a Notice of Termination for Cause to Contractor, copied to the Surety, rendering termination effective immediately, and may take any of the following actions, subject to any prior rights of the Surety: i. Take possession of the Project site and of all materials, equipment, tools, construction equipment and machinery thereon owned by Contractor; ii. Accept assignments of subcontracts;. iii. Direct Contractor to transfer title and deliver to the City (1) the fabricated and non-fabricated parts, Work in progress, completed Work, supplies and other material produced or required for the Work terminated; and (2) the completed or partially completed Project records that, if this Agreement had been completed, would be required to be furnished to the City; and iv. Finish the Work by whatever reasonable method the City may deem expedient. c. Upon the issuance of a Notice of Termination for Cause, the Contractor shall: i. Immediately deliver to the City all Project records, in. their original/native electronic format (i.e. CAD, Word, Excel, etc.), any and all other unfinished or partially completed documents, and any and.all BID'NO:2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 31 warranties and guaranties for Work, equipment or materials already installed or purchased; ii. If specifically directed by the City in writing, assign to the City all right, title and interest of Contractor under any contract, subcontract and/or purchase order, in which case the City shall have the right and obligation to settle or to pay any outstanding claims arising from said contracts, subcontracts or purchase orders; iii. As directed by the City, transfer title and deliver to the City (1) the fabricated and non-fabricated parts, Work in progress, completed Work, supplies and other material produced or required for the Work terminated; and iv. Take any action that may be necessary, or that the City'may direct, for the protection and preservation of the Project Site, including life safety and property related to this Agreement that is in the Contractor's possession and in which the City has or may acquire an interest. d. The rights and remedies of the City under Section 16 shall apply to all Defaults that are non-curable in nature, or that fail to be cured within the applicable cure period or are cured but in an untimely manner, and the City shall not be obligated to accept such late cure. 16.4. Recourse to Performance and Payment Bond; Other Remedies. a. Upon the occurrence of an Event of Default, and irrespective of whether the City has terminated the Contractor, the City may (i) make demand upon.the Surety to perform its obligations under the Performance Bond and Payment Bond, including completion of the Work, without requiring any further agreement (including, without limitation, not requiring any takeover agreement) or mandating termination of Contractor as a condition precedent to assuming the bond obligations; or (ii) in the alternative, the City may take over and complete the Work of the Project, or any portion thereof, by its own devices, by entering into a new contract or contracts for the completion of the Work, or using such other methods as in the City's sole opinion shall be required for the proper completion of the Work, including succeeding to the rights of the Contractor under all subcontracts as contemplated by Article 16. b. The City may also charge against the Performance and Payment Bond all fees and expenses for services incidental to ascertaining and collecting losses under the Performance and Payment Bond including, without limitation, accounting, engineering, and legal fees, together with any and all costs incurred in connection with renegotiation of the Agreement. 16.5. Costs and Expenses. a.. All damages, costs and expenses, including reasonable attorney's fees, incurred by the City as a result of an uncured Default or a Default cured beyond the time limits stated herein (except to the extent'the City has expressly consented, in writing, to the Contractor's late cure of such Default), together with the costs of completing the Work, shall be BID NO:2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 32 deducted from any monies due or to become due to the Contractor under this Agreement, irrespective of whether the City ultimately terminates Contractor. b. Upon issuing a Notice of Termination for Cause, the City shall have no obligation to pay Contractor, and the Contractor shall not be entitled to receive, any money until such time as the Project has been completed and the costs to make repairs and/or complete the Project have been ascertained by the City. In case such cost and expense is greater than the sum which would have been due and payable to the Contractor under this Agreement for any portion of the Work satisfactorily performed, the Contractor and the Surety shall be jointly and severally liable and shall pay the difference to the City upon demand. 16.6. Termination If No Default or Erroneous Default. If, after a Notice of Termination for Cause is issued by the City, it is thereafter determined that the Contractor was not in default under the provisions of this Agreement, or that any delay hereunder was an Excusable Delay, the termination shall be converted to a Termination for Convenience and the rights and obligations of the parties shall be the same as if the notice of termination had been issued pursuant to the termination for convenience clause contained in Section 16.1. The Contractor shall have no further recourse of any nature for wrongful termination. 16.7. Remedies Not Exclusive. Except as otherwise provided in the Contract Documents, no remedy under the terms of this Agreement is intended to be exclusive of any other remedy, but each and every such remedy shall be cumulative and shall be in addition to any other remedies, existing now or hereafter, at law, in equity or by statute. No delay or omission to exercise any . right or power accruing upon any Event of Default shall impair any such right or power nor shall. it be construed to be a waiver of any Event of Default or acquiescence therein, and every such right and power may be exercised from time to time as often as may be deemed expedient. 16.8. Materiality and Non-Waiver of Breach. Each requirement, duty, and obligation in the Contract Documents is material. The City's failure to enforce any provision of this Agreement shall not be deemed a waiver of such provision or Amendment of this Agreement. A waiver shall not be effective unless it is in writing and approved by the City. A waiver of any breach of a provision of this Agreement shall not be deemed a waiver of any subsequent breach and the failure of the City to exercise its rights and remedies under this Article 16 at any time shall not constitute a waiver of such rights and remedies. 17. Contractor Right to Terminate Contract or Stop Work: If the Project should be stopped under an order of any court or other public authority for a period of more than ninety (90) days due to no act or fault of Contractor or persons or entities within its control, or if the City should fail to pay the Contractor any material amount owing pursuant to an Approved Application for Payment in accordance with the Contract Documents and after receipt of all supporting documentation required pursuant Article 8, and if the City fails to make such payment within ninety (90) days after receipt of written notice from the Contractor identifying the Approved Application for Payment for which payment is outstanding, then, unless the City is withholding such payment pursuant to any provision of this Agreement which entitles the City to so withhold such BID NO:2018-232-ZD CITYOF MIAMI BEACH ���I1AMIBEACH payment, the Contractor shall have the right upon the expiration of the aforesaid ninety (90) day period to stop its performance of the Work, provided that Contractor has sent a Notice to Cure to the City via certified mail, allowing for a 7 day cure period. In such event, Contractor may terminate this Agreement and recover from City payment for all Work executed and reasonable expense sustained (but excluding compensation for any item prohibited by any provisions of the Contract Documents). In the alternative to termination, Contractor shall not be obligated to recommence the Work until such time as the City shall have made payment to the Contractor in respect of such Approved Application for Payment, plus any actual and reasonable related demobilization and start-up costs evidenced by documentation reasonably satisfactory to the City.. Except as set forth in this Section 16.8, no act, event, circumstance or omission shall excuse or relieve the Contractor from the full and faithful performance of its obligations hereunder and the completion of the Work as herein provided for. 18. Assignment: Neither party hereto shall assign the Contract or any subcontract in whole or in part without the written consent of the other, nor shall Contractor assign any monies due or to become due to it hereunder, without the previouswritten consent of the Mayor and City Commission. . 19. Rights of Various Interests: Whenever work being done by City's forces or by other contractors is contiguous to or within the limits of work covered by this Contract, the respective rights of the various interests involved shall be established by the Contract Administrator to secure the completion of the various portions of the work in general harmony. 20. Differing Site Conditions: In the event that during the ,course of the Work Contractor encounters subsurface or concealed conditions at the Project site which differ materially from those shown on the Contract Documents and from those ordinarily encountered and generally recognized as inherent in work of the character called for in the Contract Documents; or unknown physical conditions of the Project site, of an unusual nature, which differ materially from that ordinarily encountered and generally recognized as inherent in work of the character called for in the Contract Documents, Contractor , without disturbing the conditions and before performing any work affected by such conditions, shall, within twenty-four (24) hours, of their discovery, notify City and Consultant in writing of the existence of the aforesaid conditions. Consultant and City shall, within two (2) business days after receipt of Contractor's written notice, investigate the site conditions identified by Contractor: If, in the sole opinion of Consultant, the conditions do materially so differ and cause an increase or decrease in Contractor's cost of, or the time required for, the performance of any part of the Work, whether or not charged as a result of the conditions, Consultant shall,recommend an,equitable adjustment to the Contract Price, or the Contract Time, or both. If City and Contractor cannot agree on an adjustment in the Contract Price or Contract Time, the adjustment shall be referred to Consultant for determination in accordance with the provisions of Article 13. Should Consultant determine that the conditions of the Project site are not so materially different to justify a change in the terms of the Contract, Consultant shall so notify City and Contractor in writing, stating the reasons, and such determination shall be final and binding upon the parties hereto. • BID NO:2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 34 No request by Contractor for an equitable adjustment to the Contract under this provision shall be allowed unless Contractor has given written notice in strict accordance with the provisions of this Article. No request for an equitable adjustment or change to the Contract Price or Contract Time for differing site conditions shall be allowed if made after the date certified by Consultant as the date of substantial completion. 21. Plans and Working Drawings: City, through Consultant, shall have the right to modify the details of the plans and specifications, to supplement the plans and specifications with additional plans, drawings or additional information as the Work proceeds, all of which shall be considered as part of the Project Manual. In case of disagreement between the written and graphic portions of the Project Manual, the written portion shall,govern. 22. Contractor to Check Plans, Specifications and Data: Contractor shall verify all dimensions, quantities and details shown on the plans, specifications or other data received from Consultant, and shall notify Consultant of all errors, omissions and discrepancies found therein within three (3) calendar days of discovery. Contractor will not be allowed to take advantage of any error, omission or discrepancy, as full instructions will be furnished by Consultant. Contractor shall not be liable for damages_resulting from errors, omissions or discrepancies in the Contract Documents unless Contractor recognized such error, omission or discrepancy and knowingly failed to report it to Consultant. 23. Contractor's Responsibility for Damages and Accidents: 23.1. Contractor shall accept full responsibility for the Work against all loss or damage of whatsoever nature sustained until final acceptance by City, and shall promptly repair any damage done from any cause whatsoever, except as provided in Article 29. 23.2. Contractor shall be responsible for all materials, equipment and supplies pertaining to the Project. In the event any such materials, equipment and supplies are lost, stolen, damaged or destroyed prior to final acceptance by City, Contractor shall replace same without cost to City, except as provided in Article 29. 24. Warranty: Contractor warrants to City that all materials and equipment furnished under this Contract will be new unless otherwise specified and that all of the Work will be of good quality, free from faults and defects and in conformance with the Contract Documents. All work not conforming to these requirements, including substitutions not properly approved and authorized, may be considered defective. If required by Consultant, Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment. This warranty is not limited by the provisions of Article 26 herein. 25. ; Supplementary Drawings: 25.1. When, in the opinion of Consultant, it becomes necessary to explain the Work to be done more fully, or to illustrate the Work further, or to show any changes BID NO:2018-232-ZD CITYOF MIAMI BEACH MPAII!.IBEACH 35 which may be required, supplementary drawings, with specifications pertaining thereto, will be prepared by Consultant. 25.2. The supplementary drawings shall be binding upon. Contractor with the same force as the Project Manual. Where such supplementary drawings require either less or more than the original quantities of work, appropriate adjustments shall be made by Change Order. 26. Defective Work: 26.1. Consultant shall have the authority to reject or disapprove work which Consultant finds to be defective. If required by Consultant, Contractor shall promptly either correct all defective work or remove such defective work and replace it with non- defective work. Contractor shall bear all direct, indirect and consequential costs of such removal, or corrections including cost of testing laboratories and personnel. 26.2. Should Contractor fail or refuse to remove or correct any defective work or to make any necessary repairs in accordance with the requirements of the Contract Documents within the time indicated in writing by Consultant, City shall have the authority to cause the defective work to be removed or corrected, or make such repairs as may be necessary at Contractor's expense. Any expense incurred by City in making such removals, corrections or repairs, shall be paid for out of any monies due or which may become due to Contractor , or may be charged against the Performance Bond. In the event of failure of Contractor to make all necessary repairs promptly and fully, City may declare Contractor in default. 26.3. . If, within one (1) year after the date of substantial completion or such longer period of time as may be prescribed by the terms of'any applicable special Warranty required by the Contract Documents, or by any specific provision of the Contract Documents, any of the Work is found to be defective or not in accordance with the Contract Documents, Contractor , after receipt of written notice from City, shall promptly correct.such defective or nonconforming Work within the time specified by City without cost to City, to do so. Nothing contained herein shall be construed to establish a period of limitation with respect to any other obligation which Contractor might have under the Contract Documents including but not limited to, Article 23 hereof and any claim regarding latent defects. 26.4. Failure to reject any defective work or material shall not in any way prevent later rejection when such defect is discovered, or obligate City to final acceptance. 27. Taxes Contractor shall pay all applicable sales, consumer, use and other taxes required by law. Contractor isresponsible for reviewing the pertinent state statutes involving state taxes and complying with all requirements. 28. Subcontracts: 28.1. Contractor shall not employ any subcontractor against whom City or Consultant may have a reasonable objection. Contractor shall not be required to employ any subcontractor against whom Contractor has a reasonable objection. BID NO: 2018-232-ZD CITYOF MIAMI BEACH t�46r"+;A BEACH 36 28.2. Contractor shall be fully responsible for all acts and omissions of its subcontractors and of persons directly or indirectly employed by its subcontractors and of persons for whose acts any of them may be liable to the same extent that Contractor is responsible for the acts and omissions of persons directly employed by it. Nothing in the Contract Documents shall create any . contractual relationship between any subcontractor and City or any obligation on the part of City to pay or to see the payment of any monies due any subcontractor. City or Consultant may furnish to any subcontractor evidence of amounts paid to Contractor on account of specific work performed. 28.3 Contractor agrees to bind specifically every subcontractor to the applicable terms and conditions of the Contract Documents for the benefit of City. 28.4. Contractor shall perform the Work with its own organization, amounting to not less than 30% percent of the Contract Price. 29. Separate Contracts: 29.1. City reserves the right to let other contracts in connection with this Project. Contractor shall afford other persons reasonable opportunity for the introduction and storage of their materials and the execution of their work and shall properly connect and coordinate this Work with theirs. 29.2. If any part of Contractor's Work depends for proper execution or results upon the work of any other persons, Contractor shall inspect and promptly report to • Consultant any defects in such work that render it unsuitable for such proper execution and results. Contractor's failure to so inspect and report shall constitute an acceptance of the other person's work as fit and proper for the reception of Contractor's Work, except as to defects which may develop in other contractor's work after the execution of Contractor's. 29.3. Contractor shall conduct its operations and take all reasonable steps to coordinate the prosecution of the Work so as to create no interference or impact on any other contractor on the site. Should such interference or impact occur, Contractor shall be liable to the affected contractor for the cost of such interference or impact. 29.4. To insure the proper execution of subsequent work, Contractor shall inspect the work already in place and shall at once report to Consultant any discrepancy between the executed work and the requirements of the Contract Documents. 30. Use of Completed Portions: 30.1. City shall have the right at its sole option to take possession of and use any completed or partially completed portions of the Project. Such possession and use shall not be deemed an acceptance of any of the Work not completed in accordance with the Contract Documents. If such possession and use increases the cost of or delays the Work, Contractor shall be entitled to reasonable extra compensation or reasonable extension of time or both, as recommended by Consultant and approved by City. BID NO: 2013-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 37 30.2. In the event City takes possession of any completed or partially completed portions of the Project, the following shall occur: 30.2.1. City shall give notice to Contractor in writing at least thirty (30) calendar days prior to City's intended occupancy of a designated area. 30.2.2. Contractor shall complete to the point of Substantial Completion the designated area and 'request inspection and issuance of a Certificate of Substantial Completion in the form attached hereto as 00925 from Consultant. 30.2.3. Upon Consultant's issuance of a Certificate of Substantial Completion, City will assume full responsibility for maintenance, utilities, subsequent damages of City and public, adjustment of insurance coverage's and start of warranty for the occupied area. 30.2.4. Contractor shall complete all items noted on the Certificate of Substantial Completion within the time specified by Consultant on the Certificate of Substantial Completion, as soon as possible and request final inspection and final acceptance of the portion of the • Work occupied. Upon completion of f final inspection and receipt of an application for final payment, Consultant' shall issue a Final Certificate of Payment relative to the occupied area. 30.2.5. If City finds it necessary to occupy or use a portion or portions of the Work prior to Substantial Completion thereof, such occupancyor use shall not commence prior to a tithe mutually agreed upon by City and Contractor and to which the insurance company or companies providing the property insurance have'consented by endorsement to the policy or policies. Insurance on the unoccupied or unused portion or portions shall not be canceled or lapsed on account of such partial occupancy or use. Consent of Contractor and of the insurance company or companies to such occupancy or use shall not be unreasonably withheld. 31. Lands for Work: 31.1. City shall provide, as may be indicated in the Contract Documents, the lands upon which the Work is to be performed, rights-of-way and easements for access thereto and such other lands as are designated by City or the use of Contractor. 31.2. Contractor shall provide, at Contractor's own expense and without liability to City, any additional land and access thereto that may be required for temporary construction facilities, or for storage of materials. Contractor shall furnish to City copies of written permission obtained by Contractor from the owners of such facilities. 32. Legal Restrictions and Traffic Provisions: Contractor shall conform to and obey all applicable laws, regulations, or ordinances with 'regard to labor employed, hours of work and Contractor's general operations. Contractor shall conduct its operations so as not to close any thoroughfare, nor interfere BID NO: 2018-232-ZD CITYOF MIAMI BEACH MiaAAIBEACH 38 in any way with traffic on railway, highways, or water, without the prior written consent of the proper authorities. 33. Location and Damage to Existing Facilities, Equipment or Utilities: 33.1. As far as possible, all existing utility lines in the Project area have been shown on the plans. However, City does not guarantee that all lines are shown, or that the ones indicated are in their true location. It shall be the Contractor's responsibility to identify and locate all underground and overhead utility lines or equipment affecting or affected by the Project. No additional payment will be made to the Contractor because of discrepancies in actual and plan location of utilities, and damages suffered as a result thereof. 33.2. The Contractor shall notify each utility company involved at least ten (10) days prior to the start of construction to arrange for positive underground location, relocation or support of its utility where that utility may be in conflict with or endangered by the proposed construction. Relocation of water mains orother utilities for the convenience of the Contractor shall be paid by the Contractor. All charges by utility companies for temporary support of its utilities shall be paid for by the Contractor. All costs of permanent utility relocation to avoid conflict shall be the responsibility of the utility company involved. No additional payment will be made to'the Contractor for utility relocations, whether or not said relocation is necessary to avoid conflict with other lines. 33.3. The Contractor shall schedule the work in such a manner that the work is not delayed by the utility providers relocating or supporting their utilities. The Contractor shall coordinate its activities with any and all public and private utility providers occupying the right-of-way. No compensation will be paid to the Contractor for any loss of time or delay. 33.4. All overhead, surface or underground structures and utilities encountered are to be carefully protected from injury or displacement. All damage to such structures , is to be completely repaired within a reasonable time; needless delay will not be tolerated. The City reserves the right to remedy such damage by ordering outside parties to make such repairs at the expense of the,Contractor. All such repairs made by the Contractor are to be made to the satisfaction of the utility owner. All damaged utilities must be replaced or fully repaired. All repairs are to be inspected by the utility owner prior to backfilling. 34. Value Engineering: Contractor may request'substitution of materials, articles, pieces of equipment or any changes that reduce the Contract Price by making such request to Consultant in writing after award of contract. Consultant will be the sole judge of acceptability, and no substitute will be ordered, installed, used or initiated without Consultant's prior written acceptance which will be evidenced by either:a Change Order or an approved Shop Drawing. However, any substitution accepted by Consultant shall not result in any increase in the Contract Price or Contract Time. By making a request for substitution, Contractor agrees to pay directly to Consultant all Consultant's fees and charges related to Consultant's review of the request for substitution, whether or not the request for substitution is accepted by Consultant. Any substitution submitted by Contractor must meet the form, fit, function and life cycle criteria ofthe item proposed to be replaced and BID NO: 2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 39 1 there must be a net dollar savings including Consultant review fees and charges. If a substitution is approved, the net dollar savings shall be shared equally between Contractor and City and shall be processed as a deductive Change Order. City may. require Contractor to furnish at Contractor's expense a special performance guarantee or other surety with respect to any substitute approved after award of the Contract. 35. Continuing the Work: Contractor shall carry on the Work and adhere to the progress schedule during all disputes or disagreements with City, including disputes or disagreements concerning a request for a Change Order, a request for a change in the Contract Price or Contract Time. The Work shall not be delayed or postponed pending resolution of any disputes or disagreements. 36. Changes in the Work or Terms of Contract Documents: 36.1. Without invalidating the Contract and without notice to any surety City reserves and shall have the right, from time to time to make such increases, decreases or other changes in the character or quantity of the Work as may be considered necessary or desirable to complete fully and acceptably the proposed construction in a satisfactory manner. Any extra or additional work within the scope of this Project must be accomplished by means of appropriate Field Orders and Supplemental Instructions or Change Orders.• 36.2. Any changes to the terms of the Contract Documents must be contained in a written document, executed by the parties hereto, with the same formality and of equal dignity prior to the initiation of any work reflecting such change. This section shall not prohibit the issuance of Change Orders executed only by City as hereinafter provided. 37. Field Orders and Supplemental Instructions: 37.1. The Contract Administrator, through Consultant, shall have the right to approve and issue- Field Orders setting forth written interpretations of the intent of the Contract Documents and ordering minor changes in Work execution, providing the Field Order involves no change in the Contract Price or the Contract Time. 37.2. Consultant shall have the right to approve and issue Supplemental Instructions setting forth written orders, instructions, or 'interpretations concerning the ' Contract Documents or its performance, provided such Supplemental Instructions involve no change in the Contract Price or the Contract Time. 38. Change Orders: 38.1. Changes in the quantity or character of the Work within the scope of the Project which are not properly the subject of Field Orders or Supplemental Instructions, including all changes resulting in changes in the Contract Price, or the Contract Time, shall be authorized only by Change Orders approved in advance and issued in accordance with the provisions of the City. 38.2. All changes toconstruction contracts which exceed the Commission-approved contingency must be approved in advance in accordance with the value of the Change Order or the calculated value of the time extension. All Change Orders with a value of$50,000 or more shall be approved in advance by the Mayor and BID NO:2018-232-ZD CITYOF MIAMI BEACH rN A(AMIBEACH 40 City Commission.. All Change Orders with a value of less than $50,000 shall be approved in advance by the City Manager or his designee. 38.3. In the event satisfactory adjustment cannot be reached for any item requiring a change in the Contract Price or Contract Time, and a Change Order has not been issued, City reserves the right at its sole option to either terminate the Contract as it applies to the items in question and make such arrangements as may be deemed necessary to complete the disputed work; or submit the matter in dispute to Consultant as set forth in Article 13 hereof. During the pendency of the dispute, and upon receipt of a Change Order approved by City, Contractor shall promptly proceed with the change in the Work involved and advise the Consultant and Contract Administrator in writing within seven (.7) calendar days of Contractor's agreement or disagreement with the method, if any, provided in the Change Order for determining the proposed adjustment in the Contract Price or Contract Time. 38.4. On approval of any Contract change increasing the Contract Price,Contractor shall ensure that the performance bond and payment bond are increased so that each reflects the total Contract Price as increased. 38.5. Under circumstances determined necessary by City, Change Orders may be issued unilaterally by City. 39. Value of Change Order Work: 39.1. The value of any work covered by a Change Order or of any claim for an increase or decrease in the Contract Price shall be determined in one of the following ways: 39.1.1. ` Where the work involved is covered by unit prices contained in the Contract Documents, by application of unit prices to the quantities of items involved. 39.1.2. By mutual acceptance of a lump sum which Contractor and City acknowledge contains a component for overhead and profit. 39.1.3. On the basis of the "cost of work," determined as provided in Sections 38.2 and 38.3, plus a Contractor's fee for overhead and profit which is determined as provided in Section 39.4. 39.2. The term "cost of work" means the sum of all direct costs necessarily incurred and paid by Contractor in the proper performance of the Work described in the Change Order. Except as otherwise may be agreed to in_writing by City, such costs shall be in amounts no higher than those prevailing in the locality of the Project, shall include only the following items and shall not include any of the costs itemized in Section 39.3. 39.2.1. Payroll costs for employees in the direct employ of Contractor in the performance of the work described in the Change Order under schedules of job classifications agreed upon by City and Contractor. Payroll costs for employees not employed full time on the work covered by the Change Order shall be apportioned on the basis of their time spent on the work. Payroll costs shall include, but not be BID NO:2018-232-ZD CITYOF MIAMI BEACH ,1AlAARS BEACH 41 limited to, salaries and wages plus the cost of fringe benefits which shall include social security contributions, unemployment, excise and payroll taxes, workers' or workmen's compensation, health and retirement benefits, bonuses, sick leave, vacation and holiday pay application thereto. Such employees shall include superintendents and foremen at the site. The expenses of performing the work after regular working hours, on Sunday or legal holidays, shall be included in the above to the extent authorized by City. 39.2.2. Cost of all materials and equipment furnished and incorporated in the work, including costs of transportation and storage thereof, and manufacturers' field services required in connection therewith. All cash discounts shall accrue to Contractor unless City deposits funds with Contractor with which to make payments, in which case the cash discounts shall accrue to City. All trade discounts, . rebates and refunds, and all returns from sale of surplus materials and equipment shall accrue to City and Contractor shall make provisions so that they may be obtained. Rentals of all construction equipment and machinery and the parts thereof whether rented from Contractor or others in accordance with rental agreements approved by City with the advice of Consultant and the costs of transportation, loading, unloading, installation, dismantling and removal thereof, all in accordance with the terms of said agreements. The rental of any such equipment, machinery or parts shall cease when the use thereof is no longer necessary for the work. 39.2.3. Payments made by Contractor to Subcontractors for work performed by Subcontractors. If required by City, Contractor shall obtain competitive bids from Subcontractors acceptable to Contractor and shall deliver such bids to City who will then determine, with the advice of Consultant, which bids will be accepted. If the Subcontract provides that the Subcontractor is to be paid on the basis of cost of the workk plus a fee, the Subcontractor's cost of the work shall be determined in the same manner as Contractor 'S cost of the work. All Subcontractors shall be subject to the other provisions of the,Contract Documents insofar as applicable. • 39.2.4. Cost of special consultants, including, but not limited to, engineers, architects, testing laboratories, and surveyors employed for services specifically related to the performance of the work described in the Change Order. 39.2.5. Supplemental costs including the following: 39.2.5.1. The proportion of necessary transportation, travel and subsistence expenses of Contractor's employees incurred in discharge of duties connected with the work except for local travel to and from the site of the work. 39.2.5.2. Cost, including transportation and maintenance, of all materials, supplies, equipment, machinery, appliances, office and temporary facilities at the site and hand tools BID NO: 2018-232-ZD CITYOF MIAMI BEACH MI AMI BEACH 42 not owned by the workmen, which are consumed in the performance of the work, and cost less market value of such items used but not consumed which remains the property of Contractor . 39.2.5.3.' Sales, use, or similar taxes related to the work, and for which Contractor is liable, imposed by any governmental • authority. 39.2.5.4. Deposits lost for causes other than Contractor's negligence; royalty payments and fees for permits and licenses. 39.2.5.5. The cost of utilities, fuel and sanitary facilities at the site. 39.2.5.6. Receipted minor expenses such as telegrams, long distance telephone calls, telephone service at the site, expressage and similar petty cash items in connection with the work. , 39.2.5.7. Cost of premiums for additional bonds and insurance required because of changes in the work. 39.3. The term "cost of the work" shall not include any of the following: 39.3.1. Payroll costs and other compensation of Contractor's officers, executives, principals (of partnership and sole proprietorships), general managers, 'engineers, architects, estimators, lawyers, auditors, accountants, purchasing and contracting agents, expediters, timekeepers, clerks and other personnel employed by Contractor whether at the site or in its principal or a branch office for general administration of the work and not specifically included in the agreed- upon schedule of job classifications, all of which are to be considered administrative costs covered by Contractor's fee. 39.3.2. Expenses of Contractor's principal and branch offices other than Contractor's office at the site. 39.3.3. Any part of Contractor's capital expenses, including interest on Contractor's capital employed for the work and charges against Contractor for delinquent payments. 39.3.4. Cost of premiums for all Bonds and for all insurance whether or not Contractor is required by the Contract Documents to purchase and maintain the .same, except for additional bonds and insurance required because of changes in the work. 39.3.5. Costs due to the negligence or neglect of Contractor, any Subcontractors, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, including but not limited to, the correction of defective work, disposal of materials or BID NO: 2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 43 equipment wrongly supplied and making good any damage to property. 39.3.6. Other overhead or general expense costs of any kind and the cost of any item not specifically and expressly included in Section 38.2. 39.4. Contractor's fee allowed to Contractor for overhead aridprofit shall be determined as follows: 39.4.1.A mutually acceptable fixed fee or if none can be agreed upon, • 39.4.2.A fee based on the following percentages of the various portions of the cost of the work: 39.4.2.1. For costs incurred under Sections 39.2.1 and 39.2.2, Contractor's fee shall not exceed ten percent(10%). 39.4.2.2. For costs incurred under Section 39.2.3, Contractor's fee shall not exceed seven and one half percent (7.5%); and if a subcontract is on the basis of cost of the work plus a fee, the maximum allowable to the Subcontractor as a fee for overhead and profit shall not exceed ten percent(10%); and 39.4.2.3. No fee shall be payable on the basis of costs itemized under Sections 39.2.4 and 39.2.5, (except Section 39.2.5.3), and Section 39.3. 39.5. The amount of credit to be allowed by Contractor.to City for any such change which results in a net .decrease in cost, will be the amount of the actual net decrease. When both additions and credits are involved in any one change, the combined overhead and profit shall be figured on the basis of the net increase, if any, however, Contractor shall not be entitled to claim lost profits for any Work not performed. 39.6. Whenever the cost of any work is to be determined pursuant to Sections 38.2 and 38.3, Contractor willsubmit in a form acceptable to Consultant an itemized cost breakdown together with the supporting data. 39.7. Where the quantity of any item of the Work that is covered by a unit price is increased or decreased by more than twenty percent (20%) from the quantity of such work indicated in the Contract Documents, an appropriate Change Order shall be issued to adjust the unit price, if warranted. 39.8. Whenever a change in the Work is to be based on mutual acceptance of a lump sum, whether the amount is an addition, credit or no change-in-cost, Contractor shall submit an initial cost estimate acceptable to Consultant and Contract Administrator. 39.8.1., Breakdown shall list the quantities and unit prices for materials, labor, equipment and other items of cost. BID NO: 2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 44 • 39.8.2. Whenever a change involves Contractor and one or more Subcontractors and the change is an increase in.the Contract Price, overhead and profit percentage for Contractor and each Subcontractor shall be itemized separately. 39.9. Each Change Order must state within the body of the Change Order whether it is based upon unit price, negotiated lump sum, or"cost of the work." • 40. Notification and Claim for Change of Contract Time or Contract Price: 40.1. Any claim for a change in the Contract Time or Contract Price shall be made by written notice by Contractor to the Contract Administrator and to Consultant within five (5),calendar days of the commencement of the event giving rise to the claim and stating the general nature and cause of the claim. Thereafter, within twenty (20) calendar days of the termination of the event giving rise to the claim, written notice of the extent of the claim with supporting information and documentation shall be provided unless Consultant allows an additional period of time to ascertain more accurate data in support of the claim and such notice shall be accompanied by Contractor's written notarized statement that the adjustment claimed is the entire adjustment to which the Contractor has reason to believe it is entitled as a result of the occurrence of said event. All claims for changes in the Contract Time or Contract Price shall be determined by Consultant in accordance with Article 12 hereof,.if City and Contractor cannot otherwise agree. IT IS EXPRESSLY AND SPECIFICALLY AGREED THAT ANY AND ALL CLAIMS FOR CHANGES TO THE CONTRACT TIME OR CONTRACT PRICE SHALL BE WAIVED IF. NOT SUBMITTED IN STRICT ACCORDANCE WITH THE REQUIREMENTS OF THIS SECTION. 40.2. The Contract Time will be extended in anamount.equal to time lost on critical Work items due. to delays beyond the control of and through no fault or negligence of Contractor if a claim is made therefore as provided in Section 40.1. Such delays shall include, but not be limited to, acts or neglect by any separate contractor employed by City, fires, floods, labor disputes, epidemics, abnormal weather conditions or acts of God. 41. No Damages for Delay: No claim for damages or any claim, other than for an extension of time, shall be made or asserted against City by reason of any delays except as provided herein. Contractor shall not be entitled to an increase in the Contract Price or payment or compensation of any kind from City for direct, indirect, consequential, impact or other costs, expenses or damages, including but not limited to costs of acceleration or inefficiency, arising because of delay, disruption, interference or hindrance from any cause whatsoever, whether such delay, disruption, interference or hindrance be reasonable. or unreasonable, foreseeable or unforeseeable, or avoidable or unavoidable; provided, however, that this provision shall not preclude recovery of damages by Contractor for actual delays due solely to fraud, bad faith or active interference on the part of City or its Consultant. Otherwise, Contractor shall be entitled only to extensions of the Contract Time as the sole and exclusive remedy for such resulting delay, in accordance with and to the extent-specifically provided above. BID NO:2018-232-ZD CITYOF MIAMI BEACH to 1I4I,AIBEACH • 45 42. Excusable Delay: Compensable; Non-Compensable: 42.1 Excusable Delay. Delay which extends the completion of the Work and which is caused by circumstances beyond the control of Contractor or its subcontractors, suppliers or vendors is Excusable Delay. Contractor is entitled to a time extension of the Contract Time for each day the Work is delayed due to Excusable Delay. Contractor shall document its claim for • any time extension as provided in Article 40 hereof. Failure of Contractor to comply with Article 40 hereof as to any particular event of delay shall be deemed conclusively to constitute a waiver, abandonment or relinquishment of any and all claims resulting from that particular event of delay. Excusable Delay may be compensable or non-compensable: (a) Compensable Excusable Delay. Excusable Delay is compensable when (i) the delay extends the Contract Time, (ii) •is caused by circumstances beyond the control of the Contractor or its subcontractors, suppliers or vendors, and (iii) is caused solely by fraud, bad faith or active interference on the part of City or its agents. In no event shall Contractor be compensated for interim delays which do not extend the Contract Time. • l Contractor shall be entitled to direct and indirect costs for Compensable Excusable Delay. Direct costs recoverable by Contractor shall be limited to the actual additional costs allowed pursuant to Article 38 hereof. (b) Non-Compensable Excusable Delay. When Excusable Delay is (i) caused by circumstances beyond the control of Contractor, its subcontractors, suppliers and vendors, and is also caused by circumstances beyond the control of the City or'Consultant, or (ii) is caused jointly or concurrently by Contractor or its subcontractors, suppliers or vendors and by the City or Consultant, then Contractor shall be entitled only to a time extension and no further compensation for the delay. 43. Substantial Completion: When Contractor considers that the Work, or a portion thereof designated by City pursuant to Article 30 hereof, has reached Substantial Completion, Contractor shall so notify City and Consultant in writing. Consultant and City shall then promptly inspect the Work. When Consultant, on the basis of such an inspection, determines that the Work or designated portion thereof is substantially complete, it will then prepare a Certificate of Substantial Completion in the form attached hereto as Form 00925 which shall establish the Date of Substantial Completion; shall state the responsibilities of City and Contractor for security, maintenance, heat, utilities, damage to the Work, and insurance; and shall list all Work yet to be completed to satisfy the requirements of the'Contract . Documents for Final Completion. The failure to include any items of corrective work on such list does not alter the responsibility of Contractor to complete all of the Work in accordance with the Contract Documents. Warranties required by the Contract Documents shall commence on the date of Substantial Completion of the Work or designated portion thereof'unless otherwise provided in the Certificate of Substantial Completion. The Certificate of Substantial Completion shall be submitted to City through BID NO:: 2018-232-ZD CITYOF MIAMI BEACH AM f�l� �BCH the Contract Administrator J and Contractor for their written acceptance of the responsibilities assigned to them in such Certificate. 44. No Interest: • Any monies not paid by City when claimed to be due to Contractor under this Agreement, including, but not limited to, any and all claims for contract damages of any type, shall not be subject to interest including, but not limited to prejudgment interest. However, the provisions of City's prompt payment ordinance, as such relates to timeliness of payment, and the provisions of Section 218.74(4), Florida Statutes as such relates to the payment of interest, shall apply to valid and proper invoices. 45. Shop Drawings: 45.1. Contractor shall submit Shop Drawings as required by the Technical Specifications. The purpose of the Shop Drawings is to show the suitability, efficiency, technique of manufacture, installation requirements, details of the item and evidence of its compliance or noncompliance with the Contract Documents. 45.2. Within ten (10) calendar days after the Project Initiation Date specified in the Notice to Proceed, Contractor shall submit to Consultant a complete list of preliminary data on items for which Shop Drawings are to be submitted and shall identify the critical items. Approval of this list by Consultant shall in no way relieve Contractor from submitting complete Shop Drawingsand providing materials, equipment, etc., fully in accordance with the Contract Documents: This procedure is required in order to expedite final approval of Shop Drawings. 45.3. Afterthe approval of the list of items required in Section 45.2 above, Contractor shall promptly request Shop Drawings from the various manufacturers, fabricators, and suppliers. Contractor shall include all shop drawings and other submittals in its certification. 45.4. Contractor shall thoroughly review and check the Shop Drawings and each and every copy shall show this approval thereon. 45.5. If the Shop Drawings show or indicate departures from the Contract requirements, Contractor shall make specific mention thereof in its letter of transmittal. Failure to point out such departures shall not relieve Contractor from its responsibility to comply with the Contract Documents. 45.6. Consultant shall review and approve Shop Drawings within .seven (7) calendar days from the date received, unless said Drawings are rejected by Consultant for material reasons. Consultant's approval of Shop Drawings will be general and shall not relieve Contractor of responsibility for the accuracy of such Drawings, nor for the proper fitting and construction of the work, nor for the furnishing of materials or work required by the Contract Documents and not indicated on the Drawings. No work called for by Shop Drawings shall be performed until the said Drawings have been approved by Consultant. Approval shall not relieve Contractor from responsibility for errors or omissions of any sort on the Shop Drawings. BID NO:2018-232-ZD CITYOF MIAMI BEACH 47 MIAMI BEACH 45.7. No approval will be given to partial submittals of Shop Drawings for items which interconnect and/or are interdependent where necessary to properly evaluate the design. It is Contractor's responsibility to assemble the Shop Drawings for all such interconnecting and/or interdependent items, check them and then make one submittal to Consultant along with its comments as to compliance, noncompliance, or features requiring special attention. 45.8. If catalog sheets or prints of manufacturers' standard drawings are submitted as Shop Drawings, any additional information or changes on such drawings shall be typewritten or lettered in ink. 45.9. Contractor shall submit the number of copies required by Consultant. Resubmissions of Shop Drawings shall be made in'the same quantity until final approval is obtained. 45.10. Contractor shall keep one set of Shop Drawings marked with Consultant's approval at the job site at all times. 146. Field Layout of the Work'and Record Drawings: 46.1. The entire responsibility for establishing and maintaining line and grade in the field lies with Contractor. Contractor shall maintain an accurate and precise record 'of the location and elevation of all pipe lines, conduits, structures, maintenance access structures, handholes, fittings and the like and shall prepare record or "as-built" drawings of the same which are sealed by a Professional Surveyor. Contractor shall deliver these records in good order to Consultant as the Work is completed. The cost of all such field layout and recording work is included in the prices bid for the appropriate items. All record drawings shall be made on reproducible paper and shall be delivered to Consultant prior to, and as a condition of, final payment. 46.2. Contractor shall maintain in a safe place at the Project site one record copy of all Drawings, Plans, Specifications, Addenda, written amendments, Change Orders, Field Orders and written interpretations and clarifications in good order and annotated to show all changes made during construction. These record documents together with all approved samples and a counterpart of all approved Shop Drawings shall be available at all times to Consultant for reference. Upon Final Completion of the Project and prior to Final Payment, these record documents, samples and Shop Drawings shall be delivered to the Contract Administrator. 46.3. Prior to, and as a condition precedent to Final Payment, Contractor shall submit to City, Contractor's record drawings or as-built drawings acceptable to Consultant. 47. , Safety and Protection: 47.1. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Project. Contractor shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: BID NO:2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 48 47.1.1.. All employees on the work site and other persons who may be affected thereby; 47.1.2. All the work and all materials or equipment to be incorporated therein, whether in storage on or off the Project site; and 47.1.3. Other property at the Project site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures and utilities not designated for removal, relocation or replacement in the course of construction. 47.2. Contractor shall comply with all applicable laws, ordinances, rules, regulations and orders of any public body having jurisdiction for the safety of persons or property or to protect them from damage, injury or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and utilities when prosecution of the work may affect them. All damage, injury or loss to any property referred to in Sections 47.1.2 and 47.1.3 above, caused directly or indirectly, in whole or in part, by Contractor , any Subcontractor or anyone directly or indirectly employed by any of them or anyone for whose acts any ofthem may be liable, shall be remedied by Contractor . Contractor's duties and responsibilities for the safety and protection of the work shall continue until such time as all the Work is completed and Consultant has issued a notice to City and Contractor that the Work is acceptable except as otherwise provided in Article 29 hereof. 47.3. Contractor shall designate a responsible member of its organization at the Work site whose duty shall be the prevention of accidents. This person shall be Contractor's superintendent unless otherwise designated in writing by Contractor to City. 48. © Final Bill of Materials: Contractor shall be required to submit to City and Coisultant a final bill of materials with unit costs for each bid item for supply of materials in place. This shall be an itemized list of all materials with a unit cost for each material and the total shall agree with unit costs established for each Contract item. A Final Certificate for Payment cannot be issued by Consultant until Contractor submits the final bill of materials and Consultant verifies the accuracy of the units of Work. • 49. Payment by City for Tests: Except when otherwise specified in the Contract Documents, the expense of all tests requested by Consultant shall be borne by City and performed by a testing firm chosen • by Consultant. For road construction projects the procedure for making tests,required by Consultant will be in conformance with the most recent edition of the State of Florida, Department of Transportation Standard Specifications for Road and Bridge Construction. The cost of any required test which Contractor fails shall be paid for by Contractor. ' 50. Project Sian: BID NO: 2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 49 Any requirements for a project sign shall be paid by the Contractor as specified by City Guidelines'. 51. Hurricane Precautions: 51.1. During such periods of time as are designated by the United States Weather Bureau as being a hurricane warning or alert, the Contractor, at no cost to the City, shall take all,precautions necessary to secure the Project site in response to all threatened storm events, regardless of whether the City or Consultant has given notice of same. 51.2. Compliance with any specific hurricane warning or alert precautions will not constitute additional work. 51.3. Additional work relating to hurricane warning or alert at the Project site will be addressed by a Change Order in accordance with Section 38, General • Conditions. 51.4. Suspension of the Work caused by a threatened or actual storm event, regardless of whether the City has directed such suspension, will entitle the Contractor to additional Contract Time as noncompensable, excusable delay, and shall not give rise to a claim for compensable delay. 51.5. Within ten (10) calendar days after the Project Initiation Date specified in the Notice to Proceed, Contractor shall submit to the Owner or Owner Representative a Hurricane Preparedness Plan. 52. Cleaning Up; City's Right to Clean Up: Contractor shall at all times keep the premises free from. accumulation of waste materials or rubbish caused by its operations. At the completion of the Project, Contractor shall remove allits waste materials and rubbish from and about the Project as well as its tools, construction equipment, machinery and surplus materials. If Contractor fails to clean up during the prosecution of the Work or at the completion of the Work, City may do so and the cost thereof shall be charged to Contractor. If a dispute arises between Contractor and separate contractors as to their responsibility for cleaning up, City may clean up and charge the cost thereof to the contractors responsible therefore as Consultant shall determine to be just. 53. Removal of Equipment: In case of termination of this Contract before completion for any cause whatever, Contractor, if notified to do so by City, shall promptly remove any part or all of Contractor's equipment and supplies from the property of City, failing which City shall have the right to remove such equipment and supplies at the expense of Contractor. 54. Nondiscrimination: In connection with the performance of the Services, the Contractor shall not exclude from participation in, deny the benefits of, or subject to discrimination anyone on the grounds of race, color, national origin, sex, age, disability, religion, income or family status. Additionally, Contractor shall comply fully with the City of Miami Beach Human Rights Ordinance, codified in Chapter 62 of the City Code, as may be amended from time to BID NO:2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 50 time, prohibiting discrimination in employment, housing, public accommodations, and public services on account of actual or perceived race, color, national origin, religion, sex, intersexuality, gender identity, sexual orientation, marital and familial status, age, disability, ancestry, height, weight, domestic partner status, labor organization membership, familial situation, or political affiliation. 55. Project Records: City shall have the right to inspect and copy, at City's expense, the books and. records and accounts of Contractor which relate in any way to the Project, and to any claim for additional compensation made by Contractor, and to conduct an audit of the financial and accounting records of Contractor which relate to the Project and to any claim for additional compensation made by Contractor. Contractor shall retain and make available to City all such books and records and accounts, financial or otherwise, which relate to the'Project and to any claim for a period of three (3) years following Final Completion of the Project. During the Project and the three (3) year period following Final Completion of the Project, Contractor shall provide City access to its books and records upon seventy-two (72) hours written notice. 56. Performance Evaluations: An interim performance evaluation of the successful Contractor may be submitted by the Contract Administrator during construction of the Project. A final performance evaluation shall be submitted when the Request for Final Payment to the construction contractor is forwarded for approval. In either situation, the completed evaluation(s) shall be forwarded to the City's Procurement Director who shall provide a copy to the successful Contractor. Said evaluation(s) may be used by the City as a factor in considering the responsibility of the successful Contractor for future bids with the City. 57. Occupational Health and Safety: In compliance with Chapter 442, Florida Statutes, any toxic substance listed in Section 38F-41.03 of the Florida Administrative Code delivered as a result of this bid must be accompanied by a Material Safety Data Sheet (MSDS) which may be obtained from the manufacturer. The MSDS must include the following information: b. The chemical name and the common name of the toxic substance. c. The hazards or other risks in the use of the toxic substance, including: i. The potential for fire, explosion, corrosion, and reaction; ii. The known acute and chronic health effects of risks from exposure, including the medical conditions which are generally recognized as being aggravated by exposure to the toxic substance; and iii. The primary routes of entry and symptoms of overexposure. d. The proper precautions, handling practices, necessary personal protective equipment, and other safety precautions in the use of or exposure to the toxic substances, including appropriate emergency treatment in case of overexposure. e. The emergency procedure for spills, fire, disposal, and first aid. BID NO:2018-232-ZD CITYOF'MIAMI BEACH MIAMI BEACH 51 ` I • f. A description in lay terms of the known specific potential health risks posed by the toxic substance intended to alert any person reading this information. g. The year and month, if available, that the information was compiled and the name, address, and emergency telephone number of the manufacturer responsible for preparing the information. 58. Environmental Regulations: The City reserves the right to consider a Bidder's history of citations and/or violations of environmental regulations in investigating a Bidder's responsibility, and further reserves the right to declare a Bidder not responsible if the history of violations warrant such determination in the opinion of the City. Bidder shall submit with its Bid, a complete history of all citations and/or violations, notices and dispositions thereof. The no submission of any such documentation shall be deemed to be an affirmation by the Bidder that there are no citations or violations. Bidder shall notify the City immediately of notice of any citation-or violation which Bidder may receive after the Bid openingdate and during the time of performance of any contract awarded to it. 59. "Or Equal" Clause: Whenever a material, article or piece of equipment is identified in the Contract Documents including plans and specifications by reference to manufacturers' or vendors' names, trade names, catalog numbers, or otherwise, City, through Consultant, will have made its best efforts to name at least three (3) such references. Any such reference is intended merely to establish a standard; and, unless it is followed by the words "no substitution is permitted" because of form, fit, function and quality, any material, article, or equipment of other manufacturers and vendors which will perform or serve the requirements of the general design will be considered equally acceptable provided the materials, article or equipment so proposed is, in the sole opinion of Consultant, equal in substance, quality and function. ANY REQUESTS FOR SUBSTITUTION MUST BE MADE TO THE CITY'S PROCUREMENT DIRECTOR, WHO SHALL FORWARD.SAME TO CONSULTANT. Balance of Page Intentionally Leff Blank BID NO:2018-232-ZD CITYOF MIAMI BEACH AA AM.IBEACH 52 APPENDIx Price Form, Bid Tender Form, & Supplements ATTACHMENT A-1: ITB Price Form & Unit Price Breakdown form ATTACHMENT A-2: I3id Tender Form ATTACHMENT A-3: Supplement to Bid Tender Form: Contractor Qualification Statement ATTACHMENT A-4: Supplement to Bid Tender Form: Non-Collusion Certificate ATTACHMENT A-5: Supplement to Bid Tender Form: Drug Free Workplace Certification ATTACHMENT A-6: Supplement to Bid Tender Form: Equal Benefits Ordinance ATTACHMENT A-7: Supplement to Bid Tender Form: Trench Safety Act ATTACHMENT A-8: Supplement to Bid Tender Form: Recycled Content Information Failure to submit the attached ITBP_rice Form shall render proposal nor-responsive,-and said non-responsive proposaishall not be considered by the City_: BID NO:2018-232-ZD CITYOF MIAMI BEACH �tlAPA l BEACH 53 A-1 City orMiam Beach • ITB PRICE FORM-1 17thSTREET PARKING GARAGE • Location_ 640-17th Street, Miami Beach, FL 33139 The TOTAL BASE BID amount includes the all-inclusive total cost for the work specified in this bid,consisting of furnishing all materials,labor,equipment, shoring,supervision,mobilization,demobilization,overhead and profit,insurance,permits,and taxes to complete the work to the full Intent as shown or indicated in the contract documents.Any or all alternates,if applicable,may be selected at the City's sole discretion and based on funding availability. BIDDER MUST SUBMIT THIS ITB PRICE FORM FULLY COMPLETED, INCLUDING SECTIONS 1 AND 2, AS PART OF THE BID RESPONSE. FAILURE TO DO SO SHALL DEEM THE BIDDER NONRESPONSIVE. In the event of arithmetical errors between the division totals and the total base bid,the Bidder agrees that the total base bid shall govern. In the event of a discrepancy between the numerical total base bid and the written total base bid,the written total base bid shall govern.In absence of totals submitted for any division cost,the City shall Interpret as no bid for the ern/Edon,which may disqualify bidder. Section 1I Bidd`ers PROJECT TITLE ITB .2018 232 ZD Waterproofing 'Traffic Coating Seance"s'for :P,,afclrt Garage Decks at thef2t(�, 16th, 't7tt Street, and 4TSS Meridian Avenue Garages Individual Pro ects r " 4 *Lump Sum Grand Total(Total Base Bid) $ *PROJECT SHALL BE AWARDED TO THE LOWEST, RESPONSIVE, RESPONSIBLE BIDDER OFFERING THE LOWEST LUMP SUM GRAND TOTAL (TOTAL BASE BID) Section 2-Bidder's Affirmation: Company: Address Line 1: Address Line 2: Telephone: Email: Signature: Title/Printed Name: Date: FAILURE TO SUBMIT THIS FORM FULLY EXECUTED AND BID BOND(IF APPLICABLE)WITH BID SUBMITTAL SHALL RESULT IN BEING DEEMED NONRESPONSIVE. Note: Prevailing Wage Rates & Local Workforce Program Requirements are applicable for each parking garage whose estimated costs exceed $1,000,000.00. Refer to Section 0200 and Appendix D for additional information. BID NO:2018-232-ZD ( ' CITYOF MIAMI BEACH MIAMI BEACH 54 A-1 City of-MiamiBeach ITB.PRICE FORM-2 12Th"STREET PARKING GARAGE '" • _ Location: 512 -12th St., Miami Beach, FL 33139 The TOTAL BASE BID amount includes the all-incrusive total cost for the work spedfied in this bid,consisting of furnishing all materials,labor,equipment, shoring,supervision,mobilization,demobilization,overhead and profit,Insurance,permits,and taxes to complete the work to the full Intent as shown or indicated In the contract documents.Any or all alternates,if applicable,may be selected at the City's sole discretion and based on funding availability. BIDDER MUST SUBMIT THIS ITB PRICE FORM FULLY COMPLETED, INCLUDING SECTIONS 1 AND 2, AS PART OF THE BID RESPONSE. FAILURE TO DO SO SHALL DEEM THE BIDDER NONRESPONSIVE. In the event of arithmetical errors between the division totals and the total base bid,the Bidder agrees that the total base bid shall govern. In the event of a" discrepancy between the numerical total base bid and the written total base bid,the written total base bid shall govern.In absence of totals submitted for any division cost,the City shag interpret as no bid for the division,which may disqualify bidder. Section t PROJECT TITLE ITB 2018432-ZD:' .Waterproofing Traffic,Coating Service 'for Parking'. Garage Decks_f at the 12th, 16th, 17th Street, and ,1.755.' ,Mend art Avenue Garages Individual,t?ro�ects ,, �. ..., 'Lump Sum Grand Total(Total Base Bid) $ *PROJECT SHALL BE AWARDED TO THE LOWEST, RESPONSIVE, RESPONSIBLE BIDDER OFFERING THE LOWEST LUMP(SUM GRAND TOTAL(TOTAL BASE BID) • Section 2-Bidder's Affirmation: Company: Address Line 1: Address Line 2: Telephone: Email: Signature: Title/Printed Name: Date: J FAILURE TO SUBMIT THIS FORM FULLY EXECUTED AND BID BOND(IF APPLICABLE)WITH BID SUBMITTAL SHALL RESULT IN BEING DEEMED NONRESPONSIVE. Note: Prevailing Wage Rates & Local Workforce Program Requirements are applicable for each parking garage whose estimated costs exceed $1,000,000.00. Refer to Section 0200 and Appendix D for additional information. BID NO:2018-232-ZD CiTYOF MIAMI BEACH MI/VA!BEACH 55 A-1 • City ofMi:ii Beach ITB PRICE-FORM-3 16Th STREET PARKING-GARAGE Location:.100-16Th Street:-Mian,i Beach, FL 33139 The TOTAL BASE BID amount includes the all-indusive total cost for the work specified In this bid,consisting of furnishing all materials,labor,equipment, sharing,supervision,mobilization,demobilization,overhead and profit,Insurance,permits,and taxes to complete the work to the full intent as shown or Indicated in the contract documents.Any or all alternates,if applicable,may be selected at the City's sale discretion and based on funding availability. BIDDER MUST SUBMIT THIS ITB PRICE FORM FULLY COMPLETED, INCLUDING SECTIONS 1 AND 2, AS PART OF THE BID RESPONSE. FAILURE TO DO SO SHALL DEEM THE BIDDER NONRESPONSIVE. In the event of arithmetical errors between the division totals and the total base bid,the Bidder agrees that the total base bid shall govern. In the event of a discrepancy between the numerical total base bid and the written total base bid,the written total base bid shall govern.In absence of totals submitted for any dfvisian cost.the City shall interpret as no bid for the division,which may disqualify bidder. Section 1 Biddei s Price:< ;' PROJECT TITLE: !TB'2018-2324D Waterproofing —"'Traffc'Coat ng Services for Parkiin Garage Decks at.the 12th, 16th, 17th ;Street, and 1755,Meridian .Ayenue ,;,Garages *Lump Sum Grand Total(Total Base Bid) $ *PROJECT SHALL BE AWARDED TO THE LOWEST, RESPONSIVE, RESPONSIBLE BIDDER OFFERING THE LOWEST LUMP SUM GRAND TOTAL(TOTAL BASE BID) Section 2 r Bidder's Affirmation: Company: Address Line 1: Address Line 2: Telephone: Email: Signature: Title/Printed Name: Date: FAILURE TO SUBMIT THIS FORM FULLY EXECUTED AND BID BOND(IF APPLICABLE)WITH BID SUBMITTAL SHALL RESULT IN BEING DEEMED NONRESPONSIVE. Note: Prevailing Wage Rates& Local Workforce Program Requirements are-applicable for each parking garage whose estimated costs exceed $1,000,000.00. Refer to Section 0200 and Appendix.D for additional information. BID NO:2018-232-ZD CITYOF MIAMI BEACH AA1tiMf BEACH 56 A-1 • City of Miami Beach - . ITB—PRICE FoRM—4 _ 1755 MERIDIAN 4VE:PARK[NG-GARAGE • Location: 1755 Meridian Ave.,Miami Beach,FL 33139 The TOTAL BASE BID amount includes the all-indusive total cost for the work specified In this bid,consisting of furnishing all materials,labor,equipment, shoring,supervision,mobilization,demobilization,overhead and profit,Insurance,permits,and taxes to complete the work to the full intent as shown or indicated In the contract documents.Any or all alternates,if applicable,may be selected at the City's sole discretion and based on funding availability. BIDDER MUST SUBMIT THIS ITB PRICE FORM FULLY COMPLETED, INCLUDING SECTIONS 1 AND 2, AS PART OF THE BID RESPONSE. FAILURE TO DO SO SHALL DEEM THE BIDDER NONRESPONSIVE. In the event of arithmetical errors between the division totals and the total base bid,the Bidder agrees that the total base bid shall govern. In the event of a discrepancy between the numerical total base bid and the written total base bid,the written total base bid shall govern.In absence of totals submitted for any division cost,the Cay shall interpret as no bid for the division,which may disqualify bidder. Sectlofi t Btddets 24. PROJECT TITLE, ITB;2018-232 zD Waterproofing 'Traffic;Coating Services/or Parking; Garage Decks at the 12th, 16th, 17th Street, and 1755 Meridian ik.fenue Garages. , Indivl dual.Pro ects . r - . ar... .. *Lump Sum Grand Total(Total Base Bid) $ s - *PROJECT SHALL BE AWARDED TO THE LOWEST, RESPONSIVE, RESPONSIBLE BIDDER OFFERING THE LOWEST LUMP SUM GRAND TOTAL(TOTAL BASE BID) Section 2-Bidder's Affirmation: Company: Address Line 1: Address Line 2: Telephone: Email: Signature: Title/Printed Name: Date: J FAILURE TO SUBMIT THIS FORM FULLY EXECUTED AND BID BOND (IF APPLICABLE)WITH BID SUBMITTAL SHALL RESULT IN BEING DEEMED NONRESPONSIVE. Note: Prevailing Wage Rates & Local Workforce Program Requirements are applicable for each parking garage whose estimated costs exceed $1,000,000.00. Refer to Section 0200 and. Appendix D for additional information. BID NO:2018-2322D CITYOF MIAMI BEACH MIAMI BEACH 57 A-2 City of Miami Beach, Florida 1700 Convention Center Drive Miami Beach, Florida 33139 The undersigned, as Bidder, hereby declares that the only persons interested in this bid as principal are named herein and that no person other than herein mentioned has any interest in this bid or in the Contract to be entered into; that this bid is made without connection with any other person, firm, or parties making a bid; and that it is, in all respects, made fairly and in good faith without collusion or fraud. The Bidder further declares that it has examined the site of the Work and informed itself fully of all conditions pertaining to the place where the Work is to be done; that it has examined the Contract Documents and all addenda thereto furnished before the opening of the bids, as acknowledged below; and that it has,satisfied itself about the Work to be performed; and all other required information with the bid; and that this bid is submitted voluntarily and willingly.. The Bidder agrees, if this bid is accepted, to contract with the City, a political subdivision of the State of Florida, pursuant to the terms and conditions of the Contract Documents and to furnish all necessary materials, equipment, machinery, tools, apparatus, means of transportation, and all labor necessary to construct and complete within the time limits specified the Work covered by the Contract Documents for the Project entitled: INVITATION TO BID (ITB) No. 2018-232-ZD Waterproofing—Traffic Coating Services for Parking Garage Decks at the 12th, 16th, 17th Street, and 1755 Meridian Avenue Garages (Individual Projects) The Bidder also agrees to furnish the required Performance Bond and Payment Bond or alternative form of security, if permitted by the City, each for not less than the total bid price plus alternates, if any, provided in the ITB Price Form in Section 00408 and to furnish the required Certificate(s) of Insurance. In the event of arithmetical errors between the division totals and the total base bid in the ITB • Price Form, the Bidder agrees that the total base bid shall govern. In the event of a discrepancy between the numerical total base bid and the written total base bid, the written total base bid shall govern. In absence of totals submitted for any division cost, the City shall interpret as no bid for the division, which may disqualify bidder. J BID NO:2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 58 A-2 Acknowledgment is hereby made of the following addenda (identified by number) received since issuance of this Solicitation: I��E►Fiii>�I 1. rt,l,a iJ.t I Amendment 1 Amendment 6 Amendment 2 Amendment 7 Amendment 3Amendment 8 Amendment 4 Amendment 9 Amendment 5 Amendment 10 Attached is a Bid Bond ❑, Cash El, Money Order ❑, Unconditional Letter of Credit El, Treasurer's Check ❑, Bank Draft El, Cashier's Check El, or: Certified Check ❑ No. Bank of for the sum of Dollars ($ ). The Bidder shall acknowledge this bid by signing and completing the spaces provided below. Name of Bidder: ' ' Address Line 1: Address Line 2: Telephone Number: E-mail Address: Social Security Number: OR Federal I.D. Number: , Dun & Bradstreet No.: If a partnership, names and addresses of partners: (Sign below if not incorporated) WITNESSES: (Type or Print Name of Bidder) (Signature) (Type or Print Name Signed Above) BID NO:2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 59 A-2 (Sign below if incorporated) ATTEST: (Type or Print Name of Corporation) Secretary (Signature and Title) (CORPORATE SEAL) (Type or Print Name Signed Above) Incorporated under the laws of the State of: • BID NO:2018-232-ZD CITYOF MIAMI BEACMIAMI 4M i BEACH 60 A-3 SUPPLEMENT TO BID/TENDER FORM: CONTRACTOR QUALIFICATION STATEMENT THIS COMPLETED FORM SHOULD BE SUBMITTED WITH THE BID; HOWEVER, ANY ADDITIONAL INFORMATION NOT INCLUDED IN THE SUBMITTED FORM AS DETERMINED IN THE SOLE DISCRETION OF THE CITY, SHALL BE SUBMITTED WITHIN TWO (2) BUSINESS DAYS OF THE CITYS REQUEST. The undersigned authorized representative of the Bidder certifies the truth and accuracy of all statements and the answers contained herein. 1. Please list all Licenses, Certifications, and/or Registrations your organization may possess. Please also indicate the number of years your organization has been in possession of these licenses, certifications, and/or registrations. License/Certification#/Registration# #Years 2. Attach a list of the Key Personnel, the intended role for this Project, and resumes for each individual. 3. What business are you in? 4. Please indicate the last project of similar scope and volume that your organization has completed and its completion date. 5. Have you ever failed to complete any work awarded to you? If so, where and why? 6. List owner names, addresses and telephone numbers, and surety and project names, for all projects for which you have performed work, where your surety has intervened to assist in completion of the project, whether or not a claim was made. 7. References & Past Performance. Bidder shall submit at least three (3) references for whom the proposer has completed work similar in size and nature as the work referenced in solicitation. SUBMITTAL REQUIREMENT: Proposer shall submit a minimum of three (3) references, including the following information: 1) Firm Name, 2) Contact Individual Name & Title, 3) Address, 4)Telephone, 5) Contact's Email and 6) Narrative on Scope of Services Provided. BID NO: 2018-232-ZD CITYOF MIAMI BEACH mIAMIBEACH 61 A-3 8. Attach a list including the following information concerning all contracts in progress as of the date of submission of this bid. (In case of co-venture, list the information for all co-venturers): a. Name of Project b. Owner and Point of Contact (Minimum of Phone Number& E-mail Address) c. Original Contract Value d. Current Contract Value e. Projected Date of Completion per Contract f. Percent(%) Completion to Date of Bid Submittal 9. Has a representative of the Bidder completely inspected the proposed project and does the Bidder have a complete plan for its performance? ❑ Yes ❑No 10. State the true, exact, correct and complete name of the partnership, corporation or trade name under which you do business and the address of the place of business. (If a corporation, state the name of the president and secretary. If a partnership, state the names of all partners. If a trade name, state the names of the individuals who do businessunder the trade name). Additional Sheets may be attached as necessary. • A. The correct name of the Bidder is: B. The business is a: ❑ Sole Proprietorship ❑ Partnership ❑ Corporation C. The address of principal place of business is: D. The names of the corporate officers, or partners, or individuals doing business under a trade name, are as follows: BID NO:2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 62 A-3 E. List all organizations which were,predecessors to Bidder or in which the principals or _ officers of the Bidder were principals or officers. F. List and describe all bankruptcy petitions (voluntary or involuntary) which have been filed by or against the Bidder, its parent or subsidiaries or predecessor organizations during the past five (5) years. Include in the description the disposition of each such petition. G. List and describe all successful Performance or Payment Bond claims made to your surety(ies) during the last five (5) years. The list and descriptions should include claitns against the bond of the Bidder and its predecessor organization(s). • H. List all claims, arbitrations, administrative hearings-arid lawsuits brought by or against the Bidder or its predecessor organization(s) during the last five (5) years. The list shall include all case names; case, arbitration or hearing identification numbers; the name of the project over which the dispute arose; a description of the subject matter of the dispute; and fhe final outcome of the claim. I. List and describe all criminal proceedings or hearings concerning business related offenses in which the Bidder, its principals or officers or predecessor organization(s) were defendants. BID NO: 2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 63 A-3 J. Has the Bidder, its principals, officers or predecessor organization(s) been debarred or suspended from bidding by any government during the last five (5) years? If yes, please provide details. K. Under what conditions does the Bidder request Change Orders? L. Provide the names of all individuals or entities (including your sub-consultants) with a controlling financial interest and the percentage of ownership. The term "controlling financial interest" shall mean the ownership, directly or indirectly, of 10% or more of the outstanding capital stock in any corporation or a direct or indirect interest of 10% or more in a firm. The term "firm" shall mean any corporation, partnership, business trust or any legal entity other than a natural person. M. Individuals or entities (including our sub-consultants) with a controlling financial interest: have have not contributed to the campaign either directly or indirectly, of a candidate who has been elected to the office of Mayor or City Commissioner for the City of Miami Beach. Please provide the name(s) and date(s) of said contributions and to whom said contribution was made. N. Has the Corporation, Officers of the Corporation, Principal Stockholders, Principals of the Partnership or Owner of Sole Proprietorship ever been indicted, debarred, disqualified or suspended from performing work for the Federal Government or any State or Local Government or subdivision or agency thereof? ❑Yes El No 0. Are any indictments, debarments, disqualifications, or suspensions referenced on the previous page current? ❑Yes El No If the answer to either number N or 0 is yes, attach a written detailed explanation. BID NO: 2018-232-ZD CITYOF MIAMI BEACH M;ANU BEACH 64 A-3 P. Is the business entity owned by a certified service-disabled veteran, and or a small business owned and controlled by veterans, as defined on Section 502 of the Veteran Benefit Health, and Information Technology Act of 2006, and cited in the Database of Veteran-owned Business? ❑Yes No Q. Non-Discrimination. Pursuant to City Ordinance No.2016-3990, the City shall not enter into a contract with a business unless the business represents that it does not and will not engage in a boycott as defined in Section 2-375(a) of the City Code, including the blacklisting, divesting from, or otherwise refusing to deal with a person or entity when such action is based on race, color, national origin, religion, sex, intersexuality, gender identity, sexual orientation, marital or familial status, age or disability. SUBMITTAL REQUIREMENT: No additional submittal is required. By virtue of executing this affidavit document, Proposer, agrees it is and shall remain in full compliance with Section 2-375 of the City of Miami Beach City Code. R. Moratorium on Travel to and the Purchase of Goods or Services from North Carolina and Mississippi. Pursuant to Resolution 2016-29375, the City of Miami Beach, Florida, prohibits official City travel to the states of North Carolina and Mississippi, as well as the purchase of goods or services sourced in North ` Carolina and Mississippi. Proposer shall agree that no travel shall occur on behalf of the City to North Carolina or Mississippi, nor shall any product or services it provides to the City be sourced from these states. SUBMITTAL REQUIREMENT: No additional submittal is required. By virtue of executing this affidavit document, Proposer agrees it is and shall remain in full compliance with Resolution 2016-29375. S.. Fair Chance Requirement. Pursuant to Section 2-376 of the City Code, the City shall not enter into any contract resulting from a competitive solicitation, unless the proposer certifies in writing that the business has adopted and employs written policies, practices, and standards that are consistent with the City's Fair Chance Ordinance, set forth in Article V of Chapter 62 of the City Code ("Fair Chance Ordinance"), and which, among other things, (i) prohibits City contractors, as an employer, from inquiring about an applicant's criminal history until the applicant is given a conditional offer of employment; (ii) prohibits advertising of employment positions with a statement that an individual with a criminal record may not apply for the position, and (iii) prohibits • placing a statement on an employment application that a person with a criminal record may not apply for the position. SUBMITTAL REQUIREMENT: No additional submittal is required at this time. By virtue of executing this affidavit, Proposer certifies that it has adopted policies, practices and standards consistent''with the City's Fair Chance Ordinance. Proposer agrees to provide the City with supporting documentation evidencing its compliance upon request. Proposer further agrees that any breach of the representations made herein shall constitute a material breach of contract, and shall entitle the City to the immediate termination for cause of the agreement, in addition to any damages that may be available at law and in equity. • BID NO:2018-232-ZD- CITYOF MIAMI BEACH 65 MIAMI BEACH A-3 CONTRACTOR QUALIFICATION STATEMENT VALIDATION: The undersigned certifies that the information provided in this questionnaire is correct and accurate. IF PARTNERSHIP: - Signature Print Name of Firm Print Name Address • Title: CONTINUED ON FOLLOWING PAGE IF CORPORATION: Signature Print Name of Corporation Print Name Address Title: WITNESS: Signature Print Name Title: (CORPORATE SEAL) Attest: Secretary • BID NO:2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 66 A-4 SUPPLEMENT TO BID/TENDER FORM: NON-COLLUSION CERTIFICATE THIS FORM MUST BE SUBMITTED PRIOR TO AWARD FOR BIDDER TO BE DEEMED RESPONSIBLE. Submitted this day of 20_. The undersigned, as Bidder, declares that the only persons interested in this Bid are named herein; that no other person has any interest in this Bid or in the Contract to which this Bid pertains; that this Bid is made without connection or arrangement with any other person; and that this Bid is in every respect fair and made in good faith, without collusion or fraud. The Bidder agrees if this.Bid is accepted, to execute an appropriate City of Miami Beach document for the purpose of establishing a formal contractual relationship between the Bidder and the City of Miami Beach, Florida, for the performance of all requirements to which the Bid pertains. The Bidder states that this Bid is based upon the documents identified by the following number: Bid No. 2018-232-ZD. SIGNATURE PRINTED NAME . TITLE (IF CORPORATION) BID NO: 2018-232-ZD • CITYOF MIAMI BEACH MJAMI BEACH 67 A-5 SUPPLEMENT TO BID/TENDER FORM: DRUG FREE WORKPLACE CERTIFICATION The undersigned Bidder hereby certified that it will provide a drug-free workplace program by: (1) Publishing a statement notifying its employees that the unlawful manufacture, distribution, dispensing, possession, or use of a controlled substance is prohibited in the offeror's workplace, and specifying the actions that will be taken against employees for violations of such prohibition; (2) Establishing a continuing drug-free awareness program to inform its employees about: (i) The dangers of drug abuse in the workplace; (ii) The Bidder's policy of maintaining a drug-free workplace; (iii) Any available drug counseling, rehabilitation, and employee assistance programs; and (iv) The penalties that may be imposed upon employees for drug abuse violations occurring in the workplace; (3) Giving all employees engaged in performance of the Contract a copy of the statement required by subparagraph (1); (4) Notifying all employees, in writing, of the statement required by subparagraph (1), that as a condition of employment on a covered Contract, the employee shall: (i) Abide by the terms of the statement; and (ii) Notify theemployer in writing of the employee's conviction under a criminal drug statute for a violation occurring in the workplace no later than five (5) calendar days after such conviction; (5) Notifying the City in writing within ten (10) calendar days after receiving notice under subdivision (4) (ii) above, from an employee or otherwise receiving actual notice of such conviction. The notice shall include the position title of the employee; (6) Within thirty (30) calendar days after receiving notice under subparagraph (4) of a conviction, taking one of the following actions with respect to an employee who is convicted of a drug abuse violation occurring in the workplace: (i) Taking appropriate personnel action against such employee, up to and including termination; or (ii) Requiring such employee to participate satisfactorily in a drug abuse assistance or rehabilitation program approved for such purposes by a federal, state, or local health, law enforcement, or other appropriate agency; and (7) Making a good faith. effort to maintain a drug-free workplace program through implementation of subparagraphs(1) through (6). BID NO: 2018-232-ZD CITYOF MIAMI BEACH }A\AI BEACH 68 A-5 SUPPLEMENT TO BIDITENDER FORM: DRUG FREE WORKPLACE CERTIFICATION (Bidder Signature) (Print Vendor Name) STATE OF COUNTY OF The foregoing instrument was acknowledged before me this day of 20_, by as (name of person whose signature is being notarized) (title) of (name of corporation/company) known to me to be the person described herein, or who produced as identification, and who did/did not take an oath. NOTARY PUBLIC: (Signature) (Print Name) My commission expires: BID NO: 2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 69 A-6 SUPPLEMENT TO BID TENDER FORM: EQUAL BENEFITS ORDINANCE SUMMARY The foregoing analysis provides a summary of the major points of the proposed Ordinance: 1) What is the intent of the Ordinance? The proposed Ordinance will require certain contractors doing business with the City of Miami Beach, who are awarded a contract pursuant to competitive bids, to provide "Equal Benefits" to their employees with Domestic Partners, as they provide to employees with spouses. 2) How are "Equal Benefits" defined and what kind of "Benefits'' does the Ordinance cover? "Equal Benefits" means that contractors doing business with the City who are covered by the Ordinance shall be required to provide the same type of benefits that they offer to employees and their spouses, to employees with Domestic Partners. The type of "Benefits" defined by the Ordinance and which may be offered by a contractor include: sick leave, bereavement leave, family medical leave, and health benefits. The "Benefits" defined in the Ordinance, are the same type of benefits that the City provides to Domestic Partners of City employees, pursuant to Section 62-XXX of the City Code]. Notwithstanding the definition of "Benefits" in the Ordinance, to comply with the Ordinance a Contractor is not required to provide all the above-described benefits. Contractors are only required to offer the same type of Benefits they offer to their employees with spouses, to employees with Domestic Partners. Additionally, a Contractor who offers no benefits to employees or their spouses, would not be required to offer any benefits to employees with. Domestic Partners (and would still be in compliance with the Ordinance).] • 3) Who is considered a "Domestic Partner" under the Ordinance? A "Domestic Partner" shall mean any two (2) adults of the same or different sex who have registered as domestic partners with a government body pursuant to state or local law authorizing such registration, or with an internal registry maintained by the employer of at least one of the domestic partners. 4) What type of Contracts and/or which Contractors are covered by the Ordinance? The Ordinance only applies to the following: • Competitively bid City contracts(bids, RFP's, RFQ's, RFLI's, etc.), • Contracts valued at over$100,000, • Contractors who maintain 51 or more full time employees on their payrolls during 20 or more calendar work weeks in either the current or the preceding calendar year, • Contractors covered by the Ordinance are only required to comply as to employees who: 1) either work within the City limits of the City of Miami Beach; or 2) the contractor's employees located in the United States, but outside of the' City limits, only if those employees are directly performing work on the City contract (covered by the Ordinance). , BID NO:2018-232-ZD , CITYOF MIAMI BEACH MIAMI BEACH 70 A-6 5) In what cases does the Ordinance not apply? The provisions of the Ordinance do not apply where: • The City contract has been has been entered into prior to the effective date of the Ordinance (including renewal terms contained in such contracts); • The City contract is not competitively bid; • The City contract is valued at less than $100,000; • The contractor has less than 51 employees; • The contractor does not provide Benefits either to employees' spouses or to employees' Domestic Partners; • The contractor is a religious organization, association, society or any nonprofit charitable or educational institution or organization operated, supervised or controlled by or in conjunction with a religious organization, association or society; • The contractor is another government entity. The following City contracts are not covered by the Ordinance: • Contracts for sale or lease of City property; • Development Agreements; • Contracts/grants for CDBG, HOME, SHIP, and Surtax funds administered by the City's.Office of Community Development; • Cultural.Arts Council grants; • Contracts for professional NE, landscape NE, or survey and mapping services procured pursuant to Chapter 287.055, Florida Statutes ("The Consultants Competitive Negotiation Act"; • • Contracts for the procurement of life, health, accident, hospitalization, legal expense, annuity insurance, or any and all other kinds of insurance for the officers and employees of the City and their dependents, from a group insurance - plan. The Ordinance provides, upon written recommendation of the City Manager, that the City Commission may, by 5/7ths vote, waive application of the Ordinance for the following: • Emergency contracts; • Contracts where only one bid response is received; • Contracts where more than one bid response is received, but none of the bidders can comply with the requirements of the Ordinance. The-City's ability to'apply the Ordinance may also be preempted in instances where the Ordinance impacts health, retirement, ,or pension program which fall within the jurisdiction of the Employee Retirement Income Security Act (ERISA), and may under certain circumstances be held invalid under Federal preemption. 6) ,How is the Ordinance enforced by the City? • City contracts that are covered by the Ordinance shall notify potential bidders/proposers of the Ordinance and its requirements in the ITB documents; • At the time of entering into the contract with the City, the proposed City contractor shall certify to the City that it intends to provide Equal Benefits, along with the description of its employee benefits plan, which needs to be delivered to the Procurement Director prior to entering into the contract; BID NO: 2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 71 A-6 •` The City has the ongoing right to investigate/audit contracts for compliance with the provisions of the Ordinance; • The contractor is required to post notice to its employees at its place of business that it provides Equal Benefits. 7) Is there another way for a Contractor who does not provide Equal Benefits to comply with the Ordinance? If a contractor covered by the Ordinance has made a reasonable yet unsuccessful effort to provide Equal Benefits, it can still comply with the Ordinance by providing an employee with the "Cash Equivalent" of the similar benefit(s) offered to the contractor's employees and their spouses. 8) What are the penalties for non compliance? Failure of a contractor to comply with the requirements of the Ordinance may result in the following: • Breach/default under the contract; ■ Termination of the contract; ■ Monies due under the contract may be retained by the City until compliance is achieved; -■ Debarment of contractors.from City work, as prescribed by the City Code. • • Balance of Pape Intentionally Left Blank BID NO: 2018-232-ZD CITYOF MIAMI BEACH tvj\i\lBEACH 72 • A-6 MIAMIBEACH DECLARATION: NONDISCRIMINATION IN CONTRACTS AND BENEFITS Section 1.Vendor Information Name of Company: Name of Company Contact Person: Phone Number. Fax Number. E-mail: Vendor Number(if known): Federal ID or Social Security Number. Approximate Number of Employees in the U.S.: (If 50 or less,skip to Section 4,date and sign) Are any of your employees covered by a collective bargaining agreement or union trust fund? Yes No Union name(s): — — Section 2.Compliance Questions Question 1.Nondiscrimination-Protected Classes A. Does your company agree to not discriminate against your employees, applicants for employment, employees of the City, or members of the public on the basis of the fact or perception of a person's membership in the categories listed below? Please note: a "YES" answer means your company agrees it will not discriminate; a "NO" answer means your company refuses to agree that it will not discriminate. Please answer yes or no to each category. G Race _Yes_No C Sex Yes No C Color _Yes_No C Sexual Orientation Yes No C Creed _Yes_No 0 Gender Identity(transgender status) _Yes_No O Religion _Yes_No C Domestic partner status Yes No 0 National origin _Yes_No 0 Marital status Yes No C Ancestry _Yes_No C Disability _Yes_No 0 Age _Yes_No C AIDS/HIV status Yes No • Height _Yes_No 0 Weight Yes No B. Does your company agree to insert a similar nondiscrimination provision in any subcontract you enter into for the performance of a substantial portion of the contract you have with the City? Please note:you must answer this question,even if youdo not intend to enter into any subcontracts. Yes No • BID NO:2018.232-ZD CITYOF MIAMI BEACH MIAMI 73 A-6 Question 2.Nondiscrimination-Equal Benefits for Employees with Spouses and Employees with Domestic Partners. When awarding competitively solicited contracts valued at over $100,000 whose contractors maintain 51 or more full time employees on their payrolls during 20 or more calendar work weeks, the Equal Benefits for Domestic Partners Ordinance 2005-3494 requires certain contractors doing business with the City of Miami Beach, who are awarded a contract pursuant to competitive bids, to provide "Equal Benefits" to their employees with domestic partners, as they provide to employees with spouses. The Ordinance applies to all employees of a Contractor who work within the City limits of the City of Miami Beach, Florida; and the Contractor's employees located in the United States, but outside of the City of Miami Beach limits, who are directly performing work on the contract within the City of Miami Beach. A. Does your company provide or offer access to any benefits to employees with spouses or to spouses of employees? YES NO B. Does your company provide or offer access to any benefits to employees with (same or opposite sex) domestic partners*or to domestic partners of employees? YES NO C. Please check all benefits that apply to your answers above and list in the "other" section any additional benefits not already specified. Note: some benefits are provided to employees because they have a spouse or domestic partner, such as bereavement leave; other benefits are provided directly to the spouse or domestic partner, such as medical insurance. • BENEFIT Firm Provides Firm Provides Firm does not for Employees for Employees Provide Benefit with Spouses with Domestic Partners., c_ Health Sick Leave Family Medical Leave Bereavement Leave If Proposer cannot offer a benefit to domestic partners because of reasons outside your control, (e.g., there are no insurance providers in your area willing to offer domestic partner coverage) you may be eligible for Reasonable Measures compliance. To comply on this basis, you must agree to pay a cash equivalent and submit a completed Reasonable Measures Application (attached) with all necessary documentation, Your Reasonable Measures Application will be reviewed for consideration by the City Manager, or his designee. Approval is not guaranteed and the City Manager's decision is final. Further information on the Equal Benefits requirement is available at: wwN.rniarnibeach ov/procurement/ BID NO: 2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 74 A-6 Section 3.Required Documentation YOU MUST SUBMIT SUPPORTING DOCUMENTATION to verify each benefit marked in Question 2C. Without proper documentation, your company cannot be certified as complying with the City's Equal Benefits Requirement for Domestic Partner Ordinance. For example, to document medical insurance submit a statement from your insurance provider or a copy of the eligibility section of your plan document;to document leave programs, submit a copy of your company's employee handbook. If documentation fora particular benefit does not exist, attach an explanation. Have you submitted supporting documentation for each benefit offered? _Yes No Section 4.Executing the Document I declare under penalty of perjury under the laws of the State of Florida that the foregoing is true and correct, and that I am authorized to bind this entity contractually. • Executed this day of ,in the year • ,at • Signature Mailing Address Name of Signatory City,State,Zip Code Title • • • • BID.NO:2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 75 A-6 MIAMIBEACH REASONABLE MEASURES APPLICATION Declaration: Nondiscrimination in Contracts and Benefits Submit this form and supporting documentation to the City's Procurement Department ONLY IF you: A. Have taken all reasonable measures to end discrimination in benefits; _ B. Are unable to do so; and C. Intend to offer a cash equivalent to employees for whom equal benefits are not available. You must submit the following information with this form: 9 The names, contact persons and telephone numbers of benefits providers contacted for the purpose of acquiring nondiscriminatory benefits; 10 The dates on which such benefits providers were contacted; 11 Copies of any written response(s)you received from such benefits providers, and if written responses are unavailable, summaries of oral responses; and 12 Any other information you feel is relevant to documenting your inability to end discrimination in benefits, including, but not limited to, reference to federal or state laws which preclude the ending of discrimination in benefits. I declare (or certify) under penalty of perjury under the laws of the State of Florida that the foregoing is true and correct, and that I am authorized to bind this entity contractually. Name of Company(please print) Mailing Address of Company Signature City, State,Zip Name of Signatory(please print) Telephone.Number Title Date BID NO:2018-232-ZD CITYOF MIAMI BEACH _ MIAMI BEACH 76 A-6 Definition of Terms A. Reasonable Measures The City of Miami Beach will determine whether a City Contractor has taken all reasonable measures provided by the City Contractor that demonstrates that it is not possible for the City Contractor to end discrimination in benefits. A determination that it is not.possible for the City Contractor to end discrimination in benefits shall be based upon a consideration of such factors as: 1. The number of benefits providers identified and contacted, in writing, by the City Contractor, and written documentation from these providers that they will not provide equal benefits; 2. The existence of benefits providers willing to offer equal benefits tocthe City Contractor; and 3. The existence of federal or state laws which preclude the City Contractor from ending discrimination in benefits. B. Cash Equivalent "Cash Equivalent" means the amount of money paid to an employee with a Domestic Partner(or spouse, if applicable) in lieu of providing Benefits to the employees'Domestic partner (or spouse, if applicable). The Cash Equivalent is equal to the employer's direct expense of providing Benefits to an employee for his or her spouse. Cash Equivalent. The cash equivalent of the following benefits apply: A. For bereavement leave, cash payment forthe number of days that would be allowed as paid time off for death of a spouse. Cash payment would be in the form of wages of the domestic partner employee for the number of days allowed. B. For health benefits, the cost to the Contractor of the Contractor's share of the single monthly premiums that are being paid for the domestic partner employee, to be paid on a regular basis while the domestic partner employee maintains the such insurance in force for himself or herself. C. For family medical leave, cash payments for the number of days that would be allowed as time off for an employee to care for a spouse that has a serious health condition. Cash payment would be in the form of wages of the domestic partner employee for the number of days allowed. • • BID NO:2018-232-ZD CITYOF MIAMI BEACH t@AEaNlf BEACH 77 A-6 MIAMIBEACH SUBSTANTIAL COMPLIANCE AUTHORIZATION FORM Declaration: Nondiscrimination in Contracts and Benefits This form, and supporting documentation, must be submitted to the Procurement Department by entities seeking to contract with the City of Miami Beach that wish to delay ending their discrimination in benefits pursuant to the Rules of Procedure, as set out below. Fill out all sections that apply.Attach additional sheets as necessary. -A. Open Enrollment • Ending discrimination in benefits may be delayed until the first effective date after the first open enrollment process following the date the contract with the City begins, provided that the City Contractor submits to the Procurement Department evidence that reasonable efforts are being undertaken to end discrimination in benefits. This delay may not exceed two years from the date the contract with the City is entered into, and only applies to benefits for which an open enrollment process is applicable. Date next benefits plan year begins: Date nondiscriminatory benefits will be available: • Reason for Delay: Description of efforts being undertaken to end discrimination in benefits: BID NO:2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 78 i � A-6 B. Administrative Actions and Request for Extension Ending discrimination in benefits may be delayed to allow administrative steps to be taken to incorporate nondiscriminatory benefits into the City Contractor's infrastructure. The time allotted for these administrative steps shall apply only to those benefits for which administrative steps are necessary and may not exceed three months. An extension of this time may be granted at the discretion of the Procurement Director, upon the written request of the City Contractor. Administrative steps may include, but are not limited to, such actions as computer systems modifications, personnel policy revisions, and the development and distribution of employee communications. Description of administrative steps and dates to be achieved: If requesting extension beyond three months, please explain basis: • C. Collective Bargaining Agreements (CBA) Ending discrimination in benefits may be delayed until the expiration of a City Contractor's Current collective bargaining.agreement(s)where all of the following conditions have been met: 1. The provision of benefits is governed by one or more collective bargaining agreement(s); 2. The City Contractor takes all reasohablemeasures'to end discrimination in benefits either by requesting that the Unions involved agree to reopen the agreements in order for the City Contractor to take whatever steps necessary to end discrimination in benefits or by ending discrimination in benefits without reopening the collective bargaining agreements; and • 3. In the event that the City Contractor cannot end discrimination in benefits despite taking all reasonable measures to do so, the City Contractor provides a cash equivalent to eligible employees for whom benefits are not available. Unless otherwise authorized in writing by the Procurement Director, this cash equivalent payment must begin at the time the Unions refuse to allow the collective bargaining agreements to be reopened, or in any case no longer than three (3)months from the date the contract with the City is entered into. For a delay to be granted under this provision, written proof must be submitted with this form that: • The benefits for which the delay is requested are governed by a collective bargaining agreement; • All reasonable measures have been taken to end discrimination in benefits (see Section C.2, above); and • A cash equivalent payment will be provided to eligible employees for whom benefits are not available. • BID NO:2018-232=ZD CITYOF MIAMI BEACH Mi IBEACH 79 A-6 I declare (or certify) under penalty of perjury under the laws of the State of Florida that the foregoing is true and correct, and that I am authorized to bind this entity contractually. Name of Company (please print) Mailing Address of Company Signature _ City, State,Zip . Name of Signatory(please print) Telephone Number Title Date BID NO:2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 80 A-7 SUPPLEMENT TO BID/TENDER FORM:. TRENCH SAFETY ACT IF APPLICABLE, THIS FORM MUST BE SUBMITTED WITH BID FOR BID TO BE DEEMED RESPONSIVE. (SEE SECTION 00407) On October 1, 1990 House Bill 3181, known as the Trench Safety Act became law. This incorporates the Occupational Safety & Health Administration (OSHA) revised excavation safety standards, citation 29 CFR.S.1926.650, as Florida's own standards. The Bidder, by virtue of the signature below, affirms that the Bidder is aware of this Act, and will comply with all applicable trench safety standards. Such assurance shall be legally binding on all persons employed by the Bidder and subcontractors. The Bidder is also obligated to identify the anticipated method and cost of compliance with the applicable trench safety standards. BIDDER ACKNOWLEDGES THAT INCLUDED IN THE VARIOUS ITEMS OF THE BID AND IN THE TOTAL BID PRICE ARE COSTS FOR COMPLYING WITH THE FLORIDA TRENCH SAFETY ACT. THESE ITEMS ARE A BREAKOUT OF THE RESPECTIVE ITEMS INVOLVING TRENCHING AND WILL NOT BE PAID SEPARATELY. THEY ARE NOT TO,BE CONFUSED WITH BID ITEMS IN THE SCHEDULE OF PRICES, NOR BE CONSIDERED ADDITIONAL WORK. The Bidder further identified the costs and methods summarized below: z Quantity Unit Description Unit Price Price Extended Method • Total $ Name of Bidder Authorized Signature of Bidder BID NO:2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 81 I ' A-7 CONSIDERATION FOR INDEMNIFICATION OF CITY Consideration for Indemnification of City $25.00 Cost for compliance to all Federal and State requirements of the Trench.Safety Act* [NOTE: If the box above is checked, the Bidder must fill out the foregoing Trench Safety Act Form (Attachment A-7) in order to be considered responsive.] J • ( BID NO:2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 82 A-8` RECYCLED CONTENT INFORMATION In support of the Florida Waste Management Law, Bidders are encouraged to supply with their bid, any information available regarding recycled material content in the products bid. The City is particularly interested in the type of recycled material used(such as paper, plastic, glass, metal, etc.); and the percentage of recycled material contained in the product. The City also requests information regarding any known or potential material content in the product that may be extracted and recycled after the product has served its intended purpose. . • • • • • . l BID NO:2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 83 APPENDIX B List of Plans and Specifications BID NO: 2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 84 MIAMIBEACH B • ifST!OF PLANS 8c SPECIFICATI0N • F :. .l" _- - �. ! F, f .ail F �. -• Sheet J.. o • ITBf2018 232tZD WAaterpraofin`g—Traffic Coati 5ervicesforzParkingYGarage Decks ", .. r r. r,..-.y1. G� n,.(� ...;_ - .-, w.r... ..rttp,.:vaJ�.-k Gr :.:x=�+„d �,_d,?'..icd..,.�.:,C./w,�3<it N•...,.eiL •.'.s'-�^ _..o.a-. ! .•4r.•uvJ..se'rr_�✓�_4 r? i'7._ Division 7—Thermal and Moisture Protection Section 071800—Traffic Coatings 1-5 N/A Spec Component:SC-SL22-08/12 Sikalastic 22 Lo-Mod Traffic System (Extra Heavy Vehicular Traffic—UV Stable Full Broadcast) Division 7—Thermal and Moisture Protection Section 071800—Traffic Coatings 6-9 N/A Spec Component:SC-720-03/10 Sikalastic 720/745 Traffic System • • ( BID NO:2018-232-ZD CITYOF MIAMI BEACH N‘`A:AFI BEACH 85 APPENDIX C Required Forms for Bid Submittal (Note;Attachments below only apply if the adjacent box is checked) ® ATTACHMENT C-1: Prevailing Wage and Local Workforce Participation Program Requirements 1 ATTACHMENT C-1 A: Responsible Contractor Affidavit Form (PART A) ® ATTACHMENT C-1 B: Responsible Contractor Affidavit Form (PART B) ® ATTACHMENT C-2: Bid Guaranty Form; Unconditional Letter Of Credit ►/ ATTACHMENT C-3: Statement.Of Compliance: Prevailing Wage Rate Ordinance ® ATTACHMENT C-4: Statement Of Compliance: Davis Bacon Wages • BID NO: 2018-232-ZD CITYOF MIAMI BEACH i MIAMI BEACH 86 C-1 The Requirements of the Prevailing Wage and Local Workforce Participation Programs shall apply to the award of this project. The purpose of this appendix is to summarize, for clarity, the requirements of the City's Prevailing Wage and Local Workforce Program Requirements. In the event of any omissions or conflicts, the requirements of the City Code, with respect to these programs, shall prevail. • - . . L NIIN VIU M WAGES AND BENEFITS 1: Employee Compensation. The rate of wages and fringe benefits or cash equivalent, for all laborers, mechanics and apprentices employed by the contractor or subcontractor on the work covered by the contract, shall be not less than the prevailing rate of wages and fringe benefit payments or cash equivalence for similar skills or classifications of work as established by the Federal Register last published by the United States Department of Labor prior to the date of issuance of this solicitation. (reference: Sec 31-27). 2. Notice Requirement. On the date on which any laborer or mechanic commences work on a construction contract to which this article applies, the contractor shall be required to post a notice in.a prominent place at the work site stating the requirements of this article. (reference: Sec 31-29). 3. Certified Payrolls. With each payment application, Contractor shall submit a copy of all payrolls, including (at a minimum) the name and zip code for the covered employee, to the City accompanied by a signed "Statement of Compliance" indicating that the payrolls are correct and complete and that each laborer or mechanic has been paid, not less than the sproper prevailing wage rate for the work performed. Beginning,January 30,2018, all payroll submittals shall be completed electronically via the City's electronic compliance portal, LCP Tracker. No payment application shall be deemed accepted until such time as the Procurement Department has confirmed that a certified payroll for the applicable payment application has •been accurately submitted in LCP Tracker. • a. LCP Tracker Training.The Procurement Department offers ongoing training in LCP Tracker to all contractors. To schedule a training session, contact Alian Gonzalez at, AlianGonzalez@MiamiBeachFL.gov or at,305-673-7490. BID NO: 2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 87 C-1 - . . U. LOCAL WORKFORCE PARTICIPATION GOALS 1. Responsible Contractor Affidavit. As a condition of being responsive to the requirements of the solicitation and eligible to be considered for award, the bidder shall submit a Responsible Contractor Affidavit. The Responsible Contractor Affidavit (RCA) is comprised of two (2) forms — RCA-Part A and RCA-Part B. Both forms are required to be submitted with the bid or within 48 business hours of being notified,by the Procurement Contracting Officer for the solicitation. Failure to submit the RCA shall result in the bid being disqualified and deemed non-responsive. a. Part A—Commitment to Promote Local Workforce Participation. The contractor, and each subcontractor, shall submit RCA-Part A affirming that it will make its best reasonable efforts to promote employment opportunities for Miami-Dade County residents by seeking to achieve a project goal of having thirty percent (30%) of all construction labor hours performed by Miami-Dade County residents. The contractor shall also affirm that it will make its best reasonable efforts to promote employment opportunities for Miami Beach residents.To download RCA-Part A affidavit, click here. b. Part B — Position / Employee Data. The contractor, and each sub-contractor shall • submit RCA-Part B with the following sections completed: • Section 1 — Indicate the number of positions required to complete the contract work, the minimum qualification(s) for each position, the number of positions currently staffed, and the number of positions to be hired. '• Section 2 — For the positions indicated in Section 1, specify the name, address, and position of each current employee of the contractor or subcontractor. To download RCA-Part B form, click here. 2. Workforce Performance Report. Before its final application for payment, the contractor shall submit its final Certified Payroll in LCP Tracker, which shall be deemed its final Workforce Performance Report. If the project goal of thirty percent (30%) of all construction labor hours to be performed by Miami-Dade County residents is not met, the Contractor shall submit supporting documentation verifying reasonable efforts to promote employment ' opportunities for Miami Beach and Miami-Dade County residents. No final payment application may be approved without this information. BID NO: 2018-232-ZD CITYOF MIAMI BEACH 0AMIBEACH 88 • C-1 .• 11 t. PROCESS FLOW '• - - The following graphic outlining the major steps of the Prevailing Wage and Local Workforce Participation programs is provided illustrative purposes only. 6.Contractor submits Workforce Performance 1.Bidder submits a Report prior to bid or proposal. submittal of final payment application. , \ . • 2.With its bid or proposal,Bidder . 5.Project submits Completed. Responsible • Contractor Affidavit-Parts A and B. 'I‘ 4.Prior to /N, ' submitting every ' payment application, 3.Project Awarded. , Contractor submits Certified Payrolls in LCP Tracker. • Balance of Page Intentionally Left Blank • BID NO:2018-232-ZD CITYOF MIAMI BEACH i‘A1AMI BEACH 89 C-1A• �J THIS FORM IS REQ.UI:RED TO BE SUBMITTED WITH THE BID OR WITHIN 48 BUSINESS HOURS OF REQUEST. LOCAL WORKFORCE PARTICIPATION PROGRAM Responsible Contractor Affidavit Form Part A — Commitment to Promote Local Workforce Participation In accordance with Article III, Section 31-40 of the Miami Beach Code, all contractors and subcontractors of any tier performing on a city. contract valued in excess of$1,000,000 for(i) the construction, demolition, alteration and/or repair of city buildings or city public works • projects, or (ii) a contract valued'in excess of$1,000,000 which,provides for privately-funded construction, demolition, alteration and/or repair of buildings or improvements located on city-owned land, and which are subject to Section 31-40 of the Miami Beach Code shall comply with the requirements of the Local Workforce Participation Program. The undersigned Contractor affirms that, should it be awarded the contract pursuant to this solicitation, it shall comply with the following: i. The contractor will make its best reasonable efforts to promote employment opportunities for local Miami- Dade County residents and seek to achieve a project goal of having thirty percent (30%) of all construction labor hours performed by Miami-Dade County residents. ii. The contractor will also make its best reasonable efforts to promote employment opportunities for Miami Beach residents. To verify workers' residency, contractor(s) shall provide the residence address of each worker. ' Print Name of Affiant Print Title of Affiant Signature of Affiant Name of Firm. Date Address of Firm State Zip Code Notary Public Information Notary Public—State of County of Subscribed and sworn to(or affirmed) before me this day of, 20 by He or she is personally known to me 0 or has produced identification 0 Type of identification produced • Signature of Notary Public Serial Number Print or Stamp of Notary Public Expiration Date Notary Public Seal BID NO:2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 90 • • C-1 B • THIS FORM'IS REQUIRED TO BE SUBMITTED WITH THE BID OR WITHIN 48 BUSINESS HOURS OF REQUEST. LOCAL WORKFORCE PARTICIPATION PROGRAM } Responsible Contractor Affidavit Form Part B—Positions/Employee Data SECTION 1—REQUIRED POSITIONS. Specify the total number of positions that will be used by the Contractor(and by all subcontractors)to perform all ofthe construction trades and labor work of the contract, broken down by trade and labor category, minimum qualifications for each category,and the number of persons to be utilized in each category. Name of Contractor/Subcontractor. A B C D E, Trade/Category Minimum Qualification(s}i No.of Positions Required No.of Positions Currently No.of Positions to be for the Work Staffed Hired • ( Total SECTION 2—CURRENT EMPLOYEES.For those positions currently staffed by the contractor or subcontractor(Column 0),identify each individual by name,address and trade category of all persons proposed to perform work under the contract currently on the contractor's or subcontractor's payroll who reside in Miami Beach and Miami-Dade County. • Employee Name..,-w,T 47"4-s"-5x's Address - - ..• .- Trade/Category Performing - • I certify that the representations contained in this Construction Workforce Plan are to the best of my knowledge true and accurate. • Signature of Affiant Print Name Print Title Date • BID NO:2018-232-ZD CITYOF MIAMI BEACH MIf.MI BEACH, 91 • C-2 MIAMI BEACH ❑ BID GUARANTY FORM UNCONDITIONAL LETTER OF CREDIT Date of Issue Issuing Bank's No. Beneficiary: Applicant: City of Miami Beach Amount: 1700 Convention Center Drive in United States Funds Miami Beach, Florida 33139 Expiring: Date Bid/Contract Number We hereby authorize you to draw on (Bank, Issuer name) at by order of and for the account (branch address) of (contractor, applicant, customer) up to an aggregate amount, in United States Funds, of available by your drafts at sight, accompanied by: • A signed statement from the City. Manager of the City of Miami Beach, or his authorized representative, that the drawing is due to, default in performance of obligations on the part of agreed upon by and (contractor, applicant, customer) between City of Miami Beach, Florida and (contractor, applicant, customer) pursuant to the Bid/Contract No. for (name of project) Drafts must be drawn and negotiated not later than (expiration date) Drafts must bear the clause: "Drawn under Letter of Credit No. of dated (Bank name) This Letter of Credit sets forth in full terms of our undertaking, and such undertaking shall not in any way be modified, amended, or amplified by reference to any documents, instrument, or agreement referred to herein or to which this Letter of Credit is referred or this Letter of Credit relates, and any such reference shall not be deemed to incorporate herein by reference any document, instrument, or agreement. BID NO:2018-232-ZD CITYOF MIAMI BEACH MIAMBEACH 92 C-2 We hereby agree with the drawers, endorsers, and bona fide holders of all drafts drawn under and in compliance with the terms of this Letter of Credit that such drafts will be duly honored upon presentation to the drawee. The execution of the Contract and the submission of the required Performance and Payment Guaranty and Insurance Certificate by the shall be a release of all • obligations. (contractor, applicant, customer) This Letter of Credit is subject to the "Uniform Customs and Practice for Documentary Credits," International Chamber of Commerce (1993 revision), Publication No. 500 and to the provisions of Florida law. If a conflict between the Uniform Customs and Practice for Documentary Credits and Florida law should arise, Florida law shall prevail. If a conflict between the law of another state or country and Florida la-+w should arise, Florida law shall prevail. Authorized Signature • BID NO:2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 93 ❑ STATEMENT OF COMPLIANCE: C-3 PREVAILING WAGE RATE ORDINANCE NO. 94-2960 No. Contract No. Project Title The undersigned CONTRACTOR hereby swears under penalty of perjury that, during the period covered by the application for payment to which this statement is attached, all mechanics, laborers, and apprentices, employed or working on the site of the Project, have been paid at wage'rates, and that the wage rates of payments, contributions, or costs for fringe benefits have not been less than those required by City of Miami Beach Ordinance No. 94-2960 and the applicable conditions of the Contract. Dated , 20 (Contractor) By: (Signature) By: (Print Name and Title) STATE OF ) ) SS - COUNTY OF ) The foregoing instrument "was acknowledged before me this day of , 20_, by who is personally known to me or who has produced as identification and who did/did not take an oath. WITNESS my hand and official seal, this day of , 20_. (NOTARY SEAL) (Signature of person taking acknowledgment) (Name of officer taking acknowledgment) (typed, printed or stamped) (Title or rank) (Serial number, if any) My commission expires: BID NO:2018-232-ZD CITYOF MIAMI BEACH 1AMIBEACH STATEMENT OF COMPLIANCE: C-4 DAVIS BACON ACT No. Contract No. Project Title The. undersigned Contractor hereby swears under penalty of perjury that, during the period covered by the application for payment to which this statement is attached, all mechanics, laborers, and apprentices, employed or working on the site of the Project, have been paid at wage rates, and that the wage rates of payments, contributions, or costs for fringe benefits have not been less than those required by the Davis Bacon Act and the applicable conditions of the Contract. Dated , 20 Contractor By: (Signature) By: (Print Name and Title) STATE OF ) ) SS COUNTY OF ) The foregoing instrument was acknowledged before _me this day of , 20_, by • who is personally known to me or who has produced as identification and who did/did not take an oath. WITNESS my hand an official seal, this day of ;. , 20_. (NOTARY SEAL) (Signature of person taking acknowledgment) (Name of officer taking acknowledgment) (typed, printed or stamped) (Title or rank) (Serial number, if any) My commission expires: BID NO: 2018-232-ZD CITYOF MIAMI BEACH MIHMi BEACH 95 1 � APPENDIX Required Forms (Post-Award) ATTACHMENT D-1: Form of Performance Bond ATTACHMENT D-2: Form of Payment Bond ATTACHMENT D-3: Certificate of Corporate Principle ATTACHMENT D-4: Performance and Payment Guaranty Form: Unconditional Letter of Credit ATTACHMENT D-5: Certificate of Substantial Completion ATTACHMENT D-6: Final Certificate of Payment ATTACHMENT D-7: Form of Final Receipt BID NO: 2018-232-ZD CITYOF MIAMI BEACH Mi AMI BEACH 96 MIAMIBEACH p_1 FORM OF PERFORMANCE BOND BY THIS BOND, We , as Principal, hereinafter called Contractor, and as Surety, are bound to the City of Miami Beach, Florida, as Obligee, hereinafter called City, in the amount of Dollars ($ ) for the payment whereof Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally. WHEREAS, Contractor has by written agreement entered into a Contract, Bid/Contract No.: , awarded the day of , 20 , with City which Contract Documents are by reference incorporated herein and made a part hereof, and specifically include provision for liquidated damages, and other damages identified, and for the purposes of this Bond are hereafter referred to as the"Contract"; THE CONDITION OF THIS BOND is that if Contractor: 1. Performs the Contract between Contractor and City for construction of , the Contract being made a part of this Bond by reference, at the times and in the manner prescribed in the Contract; and 2. Pays City all losses, liquidated damages, expenses, costs and attorney's fees including appellate proceedings, that City sustains as a result of default by Contractor under the Contract; and . 3. Performs the guarantee of all work and materials furnished under the Contract for the time specified in the Contract; then THIS BOND IS VOID, OTHERWISE IT REMAINS IN FULL FORCE AND EFFECT. Whenever Contractor shall be, and declared by City to be, in default under the Contract, City having performed City obligations thereunder, the Surety may promptly remedy the default, or shall promptly: 3.1. Complete the Project in accordance with the terms and conditions of the Contract Documents; or 3.2. Obtain a bid or bids for completing the Project in accordance with the terms and conditions of the Contract Documents, and upon determination by Surety of the lowest responsible Bidder, or, if City elects, upon determination by City and Surety jointly of the lowest responsible Bidder, arrange for a contract between such Bidder and City, and make available as work progresses (even though there should be a default or a succession of defaults under the Contract BID NO: 2018-232-ZD CITYOF MIAMI BEACH M1AMIBEACH 97 J \ 1 D=1 FORM OF PERFORMANCE BOND (Continued) or Contracts of completion arranged under this paragraph) sufficient funds to pay the cost of completion less the balance of the Contract Price; but not exceeding, including other costs and damages for which the Surety may be liable hereunder, the amount set forth in the first paragraph hereof. The term "balance of the Contract Price," as used in this paragraph, shall mean the total amount payable by City to Contractor under the Contract and any amendments thereto, less the amount properly paid by City to Contractor. NO right of action shall accrue on this bond to or for the use of any person or corporation other than City named herein. The Surety hereby waives notice of and agrees that any changes, in or under the Contract Documents and compliance or noncompliance with any formalities connected with the Contract or the changes does not affect Surety's obligation under this Bond. Signed and sealed this day of , 20 WITNESSES: (Name of Corporation) Secretary By: (Signature) (CORPORATE SEAL) (Print Name and Title) IN THE PRESENCE OF: INSURANCE COMPANY: By: Agent and Attorney-in-Fact Address: } (Street) (City/State/Zip Code) Telephone No.: BID NO:2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 98 D-2 FORM OF PAYMENT BOND BY THIS BOND, We , as Principal, hereinafter called Contractor , and , as Surety, are bound to the City of Miami Beach, Florida, as :Obligee, hereinafter called City, in the amount of Dollars ($ ) for the payment whereof Contractor and Surety bind,themselves, their heirs, executors, administrators, successors and assigns, jointly and severally. WHEREAS, Contractor has by written agreement entered into a Contract, Bid/Contract No.: , awarded the day of , 20 , with City which Contract Documents are by reference ficorporated herein and made a part hereof, and specificallyinclude provision for liquidated damages, and other damages identified, and for the purposes of this Bond are hereafter referred to as the"Contract"; THE CONDITION OF THIS BOND is that if Contractor: 1. Pays City all losses, liquidated damages, expenses, costs and attorney's fees including appellate proceedings, that-City sustains because of default by Contractor under the Contract; and 2. Promptly makes payments to all claimants as defined by Florida Statute 255.05(1) for all labor, materials and supplies used directly or indirectly by Contractor in the performance of the Contract; THEN CONTRACTOR'S OBLIGATION SHALL BE VOID; OTHERWISE, IT SHALL REMAIN IN FULL FORCE AND EFFECT SUBJECT, HOWEVER, TO THE FOLLOWING CONDITIONS: 2.1. A claimant, except a laborer, who?is not in privity with Contractor and who has not received payment for its labor, materials, or supplies shall, within forty-five (45) days after beginning to furnish labor, materials, or supplies for the - prosecution of the work, furnish to Contractor a notice that he intends to look to the bond for protection. 2.2. A claimant who is not in privity with Contractor and who has not received payment for its labor, materials, or supplies shall, within ninety (90) days after performance of the labor or after complete delivery of the materials or supplies, deliver to Contractor and to the Surety, written notice of the performance of the labor or delivery of the materials or supplies and of the nonpayment. 2.3. No action for the labor, materials, or supplies may be instituted against Contractor or the Surety unless the notices stated under the preceding conditions (2.1) and (2.2) have been given. 2.4. Any action under this Bond must be instituted in accordance with the Notice and Time Limitations provisions prescribed in Section 255.05(2), Florida Statutes. BID NO: 2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 99 1 • I 0-2 -The Surety hereby waives notice of and agrees that any changes in or under the Contract Documents and compliance or noncompliance with any formalities connected with the Contract or the changes does not affect the Surety's obligation under this Bond. Signed and sealed this day of , 20 Contractor ATTEST: (Name of Corporation) By: (Secretary) (Signature) (Corporate Seal) (Print Name and Title) day of , 20 IN THE PRESENCE OF: INSURANCE COMPANY: By: Agent and Attorney-in-Fact Address: • (Street) (City/State/Zip Code) Telephone No.: • BID NO:2018-232-ZD CITYOF MIAMI BEACH PA1ArIBEACH 100 9 I f D-3 —CERTIFICATE AS TO CORPORATE PRINCIPAL , certify that I am the Secretary of the corporation named as Principal in the foregoing Performance and Payment Bond (Performance Bond and Payment Bond); that , who signed the Bond(s) on behalf of the Principal, was then of said corporation; that I know his/her signature; and,his/her signature thereto is genuine; and that said Bond(s) was. (were) duly signed, sealed and attested to on behalf of said corporation by authority of its governing body. (SEAL) Secretary (on behalf of) Corporation STATE OF FLORIDA ) ) SS COUNTY OF MIAMI-DADE ) Before me, a Notary Public duly commissioned, qualified and acting personally, appeared to me well known, who being by me first duly sworn upon oath says that 'he/she has been authorized to execute the foregoing Performance and Payment Bond (Performance Bond and Payment Bond) on behalf of Contractor named therein in favor of City Subscribed and Sworn to before me this day of , 20 My commission expires: Notary Public, State of Florida at Large Bonded by BID NO:2018-232-ZD CITYOF MIAMI BEACH MANI1 BEACH 101 D-4 PERFORMANCE AND PAYMENT GUARANTY FORM UNCONDITIONAL LETTER OF CREDIT: Date of Issue Issuing Bank's No. Beneficiary: Applicant: City of Miami Beach ) Amount: 1700 Convention Center Drive in United States Funds Miami Beach, Florida 33139 Expiry: (Date) Bid/Contract Number We hereby authorize you to draw on (Bank, Issuer name) at by order (branch address) of and for the account of (contractor, applicant, customer) up to an aggregate amount, in United States Funds, of available by your drafts,at sight, accompanied by: 1. A signed statement from the City Manager or his authorized designee, that the drawing is.due to default in performance df certain obligations on the part (contractor, applicant, customer) agreed upon by and between the City of Miami Beach, Florida and (contractor), pursuant to the (applicant, customer) Bid/Contract No. for (name of project) and Section 255.05, Florida Statutes. Drafts must be drawn and negotiated not later than . (expiration date) Drafts must bear the clause: "Drawn under Letter of Credit No. (Number), of (Bank name) dated This Letter of Credit shall be renewed for successive periods of one (1) year each unless we provide the City of Miami Beach with written;notice of our intent to terminate the credit herein extended, which notice must be provided at least thirty (30) days prior to the expiration date of the original term hereof or any renewed one (1) year term. Notification to the City that this Letter of Credit will expire prior to performance of the contractor's obligations will`be deemed a default. This Letter of Credit sets forth in full the terms of our undertaking, and such undertaking shall not in any way be modified, or.amplified by reference to any documents, instrument, of BID NO:2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 102 1 1 D-4 agreement referred to herein or to which this Letter of Credit is referred or this Letter of Credit relates, and any such reference shall not be deemed to incorporate herein by reference any document, instrument, or agreement. We hereby agree with the drawers, endorsers, and bona fide holders of all drafts drawn under and in compliance with the terms of this credit that such drafts will be dulyhonored upon presentation to the drawee. Obligations under this Letter of Credit shall be released one (1) year after the Final Completion of the Project by the (contractor, applicant, customer) This Credit is subject to the "Uniform Customs and Practice for Documentary Credits," International Chamber of Commerce (1993 revision), Publication No. 500 and to the provisions of Florida law. If a conflict between the Uniform Customs and Practice for Documentary Credits and Florida law should arise, Florida law shall prevail. If a conflict between the law of another state or country and Florida law should arise, Florida law shall prevail. Authorized Signature BID NO:2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 103 D-5 CERTIFICATE OF SUBSTANTIAL COMPLETION: PROJECT: • Consultant: (name, address) BID/CONTRACT NUMBER: TO (City): Contractor : CONTRACT FOR: NOTICE TO PROCEED DATE: DATE OF ISSUANCE: PROJECT OR DESIGNATED PORTION SHALL INCLUDE: The Work performed under this Contract has been reviewed and found to be substantially complete and all documents'required to be submitted by Contractor under the Contract Documents have.been received and accepted. The Date of Substantial Completion of the Project or portion thereof designated above is hereby established as which is also the date of commencement of applicable warranties required by the Contract Documents, except as stated below. DEFINITION OF DATE OF SUBSTANTIAL COMPLETION The Date of Substantial Completion of the Work or portion thereof designated by City is the date certified by Consultant when all conditions and requirements of permits and regulatory agencies have been satisfied and the Work, is sufficiently complete in accordance with the Contract Documents, so the Project is available for beneficial occupancy by City. A Certificate of Occupancy must be issued for Substantial Completion to be achieved, however, the issuance of a Certificate of Occupancy or the date. thereof are not to be, determinative of the achievement or date of Substantial Completion. A list of items to be completedor corrected, prepared by Consultant and approved by City, is attached hereto. The failure to include any items on such list does not alter the responsibility of Contractor to complete all work in accordance with the Contract Documents. The date of commencement of warranties for items on the attached list will, be the date of final payment unless otherwise agreed in writing. BID NO: 2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 104 9 1 D-5 Consultant BY DATE In accordance with Section 2.2 of the Contract, Contractor will complete or correct the work on' the list of items attached hereto within from the , above Date of Substantial Completion. Consultant BY DATE City, through the Contract Administrator, accepts the Work or portion thereof designated by City as substantially complete and will assume full possession thereof at (time) on (date). City of Miami Beach, Florida By Contract Administrator Date The responsibilities of City and Contractor for security, maintenance, heat, utilities, damage to the work and insurance shall be as follows: N BID NO: 2018-232-2D CITYOF MIAMI BEACH AAI MBEACH 105 i I D-6 ' FINAL CERTIFICATE OF PAYMENT: PROJECT: Consultant: (name, address) BID/CONTRACT NUMBER: TO (City): Contractor: CONTRACT FOR: I NOTICE TO PROCEED DATE: DATE OF ISSUANCE: All conditions or requirements of any permitsor regulatory agencies have been satisfied. The documents required by Section 5.2 of the Contract, and the final bill of materials, if required, have been received and accepted. The Work required by the Contract Documents has been reviewed and the undersigned certifies that the Work, including minor corrective work, has been completed in accordance with the provision of the Contract Documents and is accepted under the terms and conditions thereof. Consultant BY DATE City, through the Contract Administrator, accepts the work as fully complete and will assume full possession thereof at (time) (date) City of Miami Beach, Florida By Contract Administrator Date BID NO: 2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 106 D-7 FORM OF FINAL RECEIPT: [The following form will be used to show receipt of final payment for this Contract.] FINAL RECEIPT FOR CONTRACT NO. Received this day of , 20 , from City.of Miami Beach, Florida, the sum of - Dollars ($ ) as full and final payment to Contractor for all work and materials for the Project described as: This sum includes full and final payment for all-extra work and material and all incidentals. Contractor hereby indemnifies and releases City from all liens and claims whatsoever arising out of the Contract and Project. Contractor hereby certifies that all persons doing work upon or furnishing materials or supplies for the Project have been paid in full. In lieu of this certification regarding payment for work, materials and supplies, Contractor may submit a consent of surety to final payment in a form satisfactory to City. Contractor further certifies that all taxes imposed by Chapter 212, Florida Statutes (Sales and Use Tax Act), as amended, have been paid and discharged. [If incorporated sign below.] Contractor ATTEST: (Name of Corporation) By: (Secretary) (Signature) (Corporate Seal) (Print Name and Title) day of , 20 [If not incorporated sign below.] Contractor WITNESSES: • (Name of Firm) By: (Signature) (Print Name and Title) day of , 20_ BID NO: 2018-232-ZD CITYOF MIAMI BEACH MAY BEACH 107 AppENDix E Sample Contract • BID NO: 2018-232-ZD CITYOF MIAMI BEACH 7.1k:AM BEACH 108 MJAMIBEACH n r p♦(! SAMPLE CONTRACTjt© J f `ry r Mrd C' ,TM `y 8 O �. •N•..Jk V"iA + � on_ JIB _ '.o'i i .'AU YS�/. ,�I I .'�@tkg,'" ' 42- !;D:�✓ wr.�S'g fu�p4�1.s' �g,c.:{ e�y-\ O .- K-'.�.'LI� ' ''.l uV o_t 1731ig ? CONTRACT THIS CONTRACT is by and between the City of Miami Beach, Florida, a municipal corporation of the State of Florida,("City"), and ("Contractor"). WITNESSETH, that Contractor and City, for the considerations hereinafter named, agree as follows: ARTICLE 1 SCOPE OF WORK Contractor hereby agrees to furnish all of the labor, materials, equipment services and incidentals necessary to perform all of the work described in the Contract Documents and related thereto for the Project. 1 ARTICLE 2 CONTRACT TIME 2.1 Contractor shall be instructed to commence the Work by written instructions in the form of a Standing Order issued by the City's Procurement Director and a Notice to Proceed issued by the Contract Administrator. Two (2) Notices to Proceed will be issued for this Contract. Contractor shall commence scheduling activities, permit applications and other preconstruction work within five (5) calendar days after the Project Initiation Date, which shall be the same as the date of the first Notice to Proceed. The first Notice to Proceed and Purchase Order will not be issued until Contractor's submission to City of all required documents (including but limited to: Payment and Performance Bonds, and Insurance Certificate) and after execution of the Contract by both parties. 2.1.1. The receipt of all necessary permits by Contractor and acceptance of the full progress schedule in accordance with technical specifications section, submittal schedule and schedule of values is a condition precedent to the issuance of a second Notice to Proceed to mobilize on the Project site and commence with physical construction of the work. The Contractor shall submit all necessary documents required by this provision within twenty-one (21) calendar days of the issuance of the first Notice to Proceed. 2.2 Time is of the essence throughout this Contract. This project shall be substantially completed within (_) calendar days from the issuance of the second Notice to Proceed, and completed and ready for final payment in accordance with Article 5 within (J calendar days from the date certified by Consultant as the date of Substantial Completion. 2.3 Upon failure of Contractor to substantially complete the Contract within the specified period of time, plus approved time extensions, Contractor shall pay to City the sum of BID NO: 2018-232-ZDCITYOF MIAMI BEACH MiAMBEACH 109 dollars ($ ) for each calendar day after the time specified in Section 2.2 above, plus any approved time extensions, for Substantial Completion. After Substantial Completion should Contractor fail to complete the remaining work within the time specified in Section 2.2 above, plus approved time extensions thereof, for completion and readiness for final payment, Contractor shall pay to City the sum of dollars ($ ) for each calendar day after the time specified in Section 2.2 above, plus any approved extensions, for completion and readiness for final payment. These amounts are not penalties but are liquidated damages to City for its inability to obtain full beneficial occupancy and/or use of the Project. Liquidated damages are hereby fixed and agreed upon between tie parties, recognizing the impossibility of precisely ascertaining the amount of damages that will be sustained by City as a consequence of such delay, and both parties desiring to obviate any question of dispute concerning the amount of said damages and the cost and effect of the failure of Contractor to complete the Contract on time. The above-stated liquidated damages shall apply separately to each portion of the Project for which a time for completion is given. 2.4 City is authorized to deduct liquidated damages from monies due to Contractor for the Work under this Contract or as much thereof.as City may, in its sole discretion, deem just and reasonable. 2.5 Contractor shall be responsible for reimbursing City, in addition to liquidated damages, for all costs incurred by Consultant in administering the construction of the Project beyond the completion date specified above, plus approved time extensions. Consultant construction administration costs shall be pursuant to the contract between City and Consultant, a copy of which is available upon request of the Contract Administrator. All such costs shall be deducted from the monies due Contractor for performance of Work under this Contract by means of unilateral credit change orders issued by City as costs are incurred by Consultant and agreed to by City. ARTICLE 3 THE CONTRACT SUM [ j This is a Unit Price Contract:* [X] This is a Lump Sum Contract:* 3.1 City shall pay to Contractor the amounts determined for the total number of each of the units of work completed at the unit price stated in the schedule of prices bid. The number of units contained in this schedule is an estimate only, and final payment shall be made • for the actual number of units incorporated in or made necessary by the Work covered by the Contract Documents. 3.2 Payment shall..be made at the unit prices applicable to each integral part of the Work. These prices shall be full compensation for all costs, including overhead and profit, associated with completion of all the Work infull conformity with the requirements as stated or shown, or both, in the Contract Documents. The cost of any item of work not covered by a definite Contract unit price shall be included in the Contract unit price or lump sum price to which the item is most applicable. [X] This is a Lump Sum Price Contract:* BID NO: 2018-232-ZD CITYOF MIAMI BEACH MI AMI BEACH 110 O 3.1 City shall pay to Contractor for the performance of the Work described in the Contract Documents, the total price stated as awarded. 3.2 The Contract Price is $ , consisting of a base bid in the amount of-$ and a separate line item in the amount of$ for the Owner's Contingency (to be used solely by the City at its sole discretion for the purposes described in the Contract Documents). The Contract Price, exclusive of the Owner's Contingency, shall be full compensation for all labor, materials, equipment, costs, and expenses, including overhead and profit, associated with completion of all the Work accordance with the requirements of the Contract Documents, including all Work reasonably inferable therefrom, even if such item ofWork is not specifically or expressly identified as part of a line item in the ITB Price Form. *Note: Some projects include both unit prices and lump sums in which case both sections shall apply to the Work identified for each type of Contract. ARTICLE 4 PROGRESS PAYMENTS 4.1 Contractor may make Application for Payment for work completed during the Project at intervals of not more than once a month. Contractor's application shall show a complete breakdown of the Project components, the quantities completed and the amount due, together with such supporting evidence as may be required by Consultant. Contractor shall include, but same shall be limited to, at Consultant's discretion, with each Application for Payment, an updated progress schedule acceptable to Consultant as required by the Contract Documents and a release of liens and consent of surety relative to the work which is the subject of the Application. Following submission of an acceptable updated progress schedule and the other documents required herein a log with the Application for Payment, City shall make payment to Contractor after approval by Consultant of an Application for Payment, less retainage as herein provided for and/or withholding of any other amounts pursuant to the Contract Documents, within twenty-five (25) days in accordance with Section 218.735 of the Florida Statutes. 4.2 1 The City shall.withhold from each progress payment made to Contractor retainage in the amount of ten percent (10%) of each such payment until fifty percent (50%) of the Work has been completed. The Work shall be considered 50% complete at the point at which the City has expended 50% of the approved Cost of the Work together with all costs associated with existing change orders or other additions or modifications to the construction services provided for in this Agreement. Thereafter, the Contract Administrator shall reduce to five percent (5%) the amount of retainage withheld from each subsequent progress payment made to the Contractor, until Substantial Completion as provided in ITB Section 0500, Sub-Section 43. Any reduction in retainage shall be in accordance with Section 255.078 of the Florida Statutes, as may be amended, and shall otherwise be at the sole discretion of the Contract Administrator, after considering any recommendation of Consultant with respect thereto. Contractor shall have no entitlement to a.release of, or reduction in, retainage, except as may be required herein or by Florida law. Any interest earned on retainage shall accrue to the benefit of City. All requests for.retainage reduction shall be in writing in a stand-alone document, separate from monthly applications for payment. BID NO:2018-232-ZD CITYOF MIAMI BEACH MIAMtBEACH 4.3 City may withhold, in whole or in part, payment to such extent as may be necessary to protect itself from loss on account of: 4.3.1 Defective work not remedied. 4.3.2 Claims filed or reasonable evidence indicating probable filing of claims by other parties against Contractor or City because of Contractor's performance. 4.3.3 Failure of Contractor to make payments properly to Subcontractors or for material or labor. 4.3.4 Damage to another contractor not remedied. 4.3.5 Liquidated damages and costs incurred by Consultant for extended construction administration. 4.3.6 Failure of Contractor to provide any and all documents required by the Contract Documents. When the above grounds are removed or resolved satisfactory to the Contract Administrator, payment shall be made in whole or in part. ARTICLE 5 ACCEPTANCE AND FINAL PAYMENT 5.1 Upon receipt of written notice from Contractor that the Work is ready for final inspection and acceptance, Consultant shall, within ten (10) calendar days, make an inspection thereof. If Consultant and Contract Administrator find'the Work acceptable, the requisite documents have been submitted•and,the requirements of the Contract Documents fully satisfied, and all conditions of the permits and regulatory agencies have been met, a Final Certificate of „Payment (Form 00926) shall be issued by Consultant, over its signature, stating that the requirements of the Contract Documents have been performed and the Work is ready for acceptance under the terms and conditions thereof. 5.2 Before issuance of the Final Certificate for Payment, Contractor shall deliver to Consultant a complete release of all liens arising out of this Contract, receipts in full in lieu thereof; an affidavit certifying that all suppliers and subcontractors have been paid in full and that all other indebtedness connected with the Work has been paid, and a consent of the surety to final payment; the final corrected as-built drawings; and the final bill of materials, if required, and invoice. 5.3 If, after the Work has been substantially completed, full completion thereof is materially delayed through no fault of.Contractor, and Consultant so certifies, City shall, upon certificate of Consultant, and without terminating the Contract, make payment of the balance due for that portion of the Work fully completed and accepted. Such payment shall be made under the terms and conditions governing final payment, except that it shall not constitute a waiver of claims. 5.4 Final payment shall be made only after the City Manager or his designee has reviewed a written evaluation of the performance of Contractor prepared by the Contract Administrator, and approved the final payment. The acceptance of final payment shall constitute a waiver of all claims by Contractor, except those previously made in strict • BID NO:2018-232-ZD CITYOF MIAMI BEACH Mlrvnv«6EACH 112 accordance with the provisions of the General Conditions and identified by Contractor as unsettled at the time of the application for final payment. ARTICLE 6—MISCELLANEOUS 6.1 The requirements of the Contract Documents, as such term is defined in the Invitation to Bid, are hereby incorporated by reference as if fully set forth herein. This Contract is part of, and incorporated in, the Contract Documents as defined herein. Accordingly, all of the documents incorporated by the Contract Documents shall govern this Project.. 6.2 Where there is a conflict between any provision set forth within the Contract Documents and a more stringent provision elsewhere in the Contract Documents or under any law, regulation, statute or code requirement which is applicable to this Project, themore stringent state or federal provision shall prevail and govern the performance of the Work. 6.3 Public Entity Crimes In accordance with the Public Crimes Act, Section 287.133, Florida Statutes, a person or affiliate who is a contractor, consultant or other provider, who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a bid on a contract to provide any goods or services to the City, may not submit a bid on a contract with the City for the construction or repair of a public building or public work, may not submit bids on leases of real property to the City, may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with the City, and may not transact any business with the City in excess of the threshold amount provided in Section 287.017, Florida Statutes, for category two purchases for a period of 36 months from the date of being placed on the convicted vendor list. Violation of this section by Contractor shall result in cancellation of the City purchase and may result in Contractor.debarment. 6.4 Independent Contractor Contractor is an independent contractor under this Contract. Services provided by Contractor pursuant to this Contract shall be subject to the supervision of Contractor. In providing such services, neither Contractor nor its agents shall act as officers, employees, or agents of the City. This Contract shall not constitute or make the parties a partnership or joint venture. 6.5 Third Party Beneficiaries Neither Contractor nor City intends to directly or substantially benefit a third party by this Contract. Therefore, the parties agree that there are no third party beneficiaries to this Contract and that no third party shall be entitled to assert a claim against either of them based upon this Contract. The parties expressly acknowledge that it is not their intent to create any rights or obligations in any third person or entity under this Contract. 6.6 Notices Whenever either party desires to give notice to the other, such notice must be in writing, sent by certified United States Mail, postage prepaid, return receipt requested, or by BID NO: 2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 113 hand-delivery with a request for a written receipt of acknowledgment of delivery, addressed to the party for whom it is intended at the place last specified. The place for giving notice shall remain the same as set forth herein until changed in writing in the manner provided in this. section. For the present, the parties designate the following: For City: Attn: With copies to: c` City Attorney City of Miami Beach 1700 Convention Center Drive Miami Beach, Florida 33139 For Contractor: Attn: 6.7 Assignment and Performance • Neither this Contract nor any interest herein . shall be assigned, transferred, or encumbered by either party. In addition, Contractor shall not subcontract any portion of the work required.by this Contract except as authorized by Section 27 of the General Conditions. Contractor represents that all persons delivering the services required, by this Contract have the knowledge and skills, either by training, experience,'education, or a combination thereof, to adequately and competently perform the duties, obligations, and services set forth in the Scope of Work and to provide and perform such services,to City's satisfaction for the agreed compensation. Contractor shall perform its duties, obligations, and services under this Contract in a skillful and respectable manner. The quality of Contractor's performance and all interim and final product(s) provided to or on behalf of City shall be comparable to the best local and national standards. . • 6.8 Materiality and Waiver of Breach City and Contractor agree that each requirement, duty, and obligation set forth in these Contract Documents is substantial and important to the formation of this Contract and, therefore, is a material term hereof\ City's failure to enforce any provision of this Contract shall not be deemed a waiver of such provision or modification of this Contract. A waiver of any breach of a provision of this Contract shall not be deemed a waiver of any subsequent breach and shall not be construed to be a modification of the terms of this Contract. BID NO:2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 114 6.9 Severance In the event a portion of this Contract is found by a court of competent jurisdiction to be invalid, the remaining provisions shall continue to be effective unless City or Contractor elects to terminate this Contract. An election to terminate this Contract based upon this provision shall be made within seven (7) days after the finding by the court becomes final. 6.10 Applicable Law and Venue This Contract shall be enforceable in Miami-Dade County, Florida, and if legal action is necessary by either party with respect to the enforcement of any or all of the terms or conditions herein exclusive venue for the enforcement of same shall lie in Miami-Dade County, Florida. By entering into this Contract, Contractor and City hereby expressly waive any rights either party may have to a trial by jury of any civil litigation related to, or arising out of the Project. Contractor shall specifically bind all subcontractors to the provisions of this Contract. 6.11 Amendments No modification, amendment, or alteration in the terms or conditions contained herein shallbe effective unless contained in a written document prepared with the same or similar formality as this Contract and executed by the City and Contractor. 6.12 Prior Agreements This document incorporates and includes all .prior negotiations, correspondence, conversations, agreements, and understandings 'applicable to the matters contained herein and the parties agree that there are no commitments, agreements or understandings concerning the subject matter of this Contract that are not contained in this document. Accordingly, the parties agree that no deviation from the terms hereof shall be .predicated upon any prior representations or agreements, whether oral or written. It is further agreed that no modification, amendment or alteration in the terms or conditions contained herein shall be effective unless set forth in writing in accordance with Section 6.11 above. IN WITNESS WHEREOF, the parties have set their hands and seals the day and year first above written: ATTEST: THE CITY OF MIAMI BEACH, FLORIDA City Clerk Mayor ATTEST: BID NO:2018-232-ZD . CITYOF MIAMI BEACH MIAMI BEACH 115 Signature/Secretary Signature/President Print Name Print Name Date ATTACHMENTS ATTACHMENT A- Resolution, Commission Item Summary, and Commission Memorandum ATTACHMENT B - Invitation to Bid ("ITB") ATTACHMENT C- Bidder's Response to the ITB ATTACHMENT D- Insurance APPENDIX D: Required Forms APPENDIX D-1: Form of Performance Bond APPENDIX D-2: Form of Payment Bond APPENDIX D-3: Certificate of Corporate Principal APPENDIX D-4: Performance and Payment Guaranty Form: Unconditional Letter of Credit APPENDIX D-5: Certificate of Substantial Completion APPENDIX 13-6: Final Certificate of Payment APPENDIX D-7: Form of Final Receipt • • • i BID NO: 2018-232-ZD CITYOF MIAMI BEACH MI" y �� 1a� 6BEACH 1s APPENDIX F Specifications BID NO: 2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 117 ATTACHMENT C CONTRACTORS RESPONSE TO THE (ITB) Detail by FEI/EIN Number Page 1 of 2 Ponca Geoarr,en;ar 3tata na.oa r. CoRPc.' :o,is • • li: ; C/ Department of State / Division of Corporations / Search Records / Detaif By Document Number/ • Detail by FE1/E1N Number Florida Profit Corporation FLORIDA CONSTRUCTION&ENGINEERING INC. • Filing Information Document Number M45192 FEI/EIN Number 59-2768130 Date Filed 01/21/1987 State FL Status ACTIVE Last Event AMENDMENT Event Date'Filed 11/10/2014 Event Effective Date NONE ' Principal Address - 155 BENTLEY DR MIAMI SPRINGS, FL 33166 • Changed: 03/06/1999, Mailing Address P.O. BOX 1426 MIAMI SPRINGS, FL 33266-1426 Changed:09/22/1997 • Registered Agent Name&Address • • ROJAS, YUREIBA D 301 ALMERIA AVENUE • SUITE 330 • • CORAL GABLES, FL 33134 Name Changed:01/28/2019 Address Changed:01/28/2019 Officer/Director Detail Name&Address Title President DAO DAHDAH, JOHNNY htt13://SearCh.SUIbiZ.Org/IrtauirV/C",nrnnratinnSearch/S earchRPsi iltDPtail9inn '3/1'x/2.171 A Detail by FEI/EIN Number Page 2 of 2 1010 SW 2ND AVE APT PHO3 • MIAMI, FL 33130 • Annual Reports • Report Year Filed Date 2017 02/08/2017 / 2018 03/13/2018 2019 01/28/2019 Document Images 01/25/2019—ANNUAL REPORT View image in PDF format 03/13/2013—ANNUAL REPORT View image in PDF format 02108/2017—ANNUAL REPORT View image in PDF format 02/16/2016—ANNUAL REPORT View image in PDF format 02/25/2015—ANNUAL REPORT View image in PDF format 11/10120/4—Amendment •View image in PDF format 03/04/2014—ANNUAL REPORT View image in PDF format - 03/01/2013—ANNUAL REPORT View image in PDF format 02/14/2012—ANNUAL REPORT View image in PDF format 02/22/2011—ANNUAL REPORT View image in PDF format 02/16/2010—ANNUAL REPORT View image in PDF format 04/08/2009—ANNUAL REPORT , 'View image in PDF format • 03/25/2008—ANNUAL REPORT View image in PDF format 01/16/2007—ANNUAL REPORT View image in PDF format 04/17/2006—ANNUAL REPORT View image in PDF format • 03/29/2005—ANNUAL REPORT View image in PDF format • 12/27/2004—Amendment • View image In PDF format 07/07/2004—ANNUAL REPORT View image in PDF format 03/21/2003—ANNUAL REPORT View image in PDF•format 04/30/2002—ANNUAL REPORT View image in PDF format 01/17/2001—ANNUAL REPORT View image in PDF format 06/08/2000—ANNUAL REPORT View image in PDF format 03/06/1999—ANNUAL REPORT View image in PDF format 01/15/1998—ANNUAL REPORT View image in PDF format 09/30/1997—VOLUNTARY DISSOLUTION View image in PDF format Fonda Otuartm ::oroorar:oo httrn1//aparch clnra imril.lirx,/C caratinnQmar h/QA.arr411?Ao,i1+Tlrvfai19inn.•1 : ..,Z/4.1/7(11 Q • BASF The Chemical Company • December 17, 2018 • Attn: Mr. Danny Flores City of Miami Beach Procurement Department 1755 Meridian Avenue, 3rd Floor Miami Beach FL, 33139 305-673-7000 Ext 6652 Project: Miami Beach Parking Garages Contractor: Mr. Hamid Djahanshahi Florida Construction & Engineering Inc 155 Bentley Drive Miami Springs, FL 33166 BASF Product: MasterSeal 2500 Traffic System To Whom It May Concern: BASF does not have an approved applicator program with regards to MasterSeal 2500 Traffic System,nor does BASF provide supervision for the installation of its MesterSeal 2500 Traffic System. What BASF can do is provide names of applicators who have demonstrated an acceptable level of competence with regards to the application of these • systems. • In that regard, Florida Construction & Engineering Inc have been trained in the handling, mixing and application of this system and have demonstrated themselves to be a competent applicator of Wall Coatings, Sealant, and Waterproofing products, manufactured by BASF, including the MasterSeal 2500 Traffic System. It should be noted by all parties that past performance by Florida Construction & Engineering Inc or any applicator using our products, does not guarantee future results. In most cases, upon project completion a formal warranty document will be issued. Please note that the contents of this letter and/or any action taken on this matter by myself by or on behalf of BASF Building Systems and/or any BASF entities, does not constitute a waiver of any of the rights and/or obligations of BASF Building Systems and/or any BASF entities so stated herein. Please feel free to contact me at 786-461-2612, should you have any questions related to the contents of this letter. Sincerely, S./Joe a • Parking & Restoration Specialist—South Florida 786-765-6475 BASF Building Systems. - BASF Corporation. A Construction Systems MASTER' 889 VallpePark Drive »BUILDERS Shakopee, MN 55379 Telephone:(952)496-6000 $O JJflOf5 • • Tremco Incorporated 7IE ,JcO www.tremcosealants.com Commercial Sealants&Waterproofing • Jeff"J.B."Snyder,Jr. • 'Tremco Commercial Sealants&Waterproofing P 561-232-7430 DATE: December 19,2018 • PROJECT: Miami Beach Parking Garages-Bid 2018-232-ZD CONTRACTOR: Florida Construction & Engineering LOCATION: Miami Beach, FL To Whom It May Concern: This letter is to confirm Florida Construction & Engineering is approved to install Tremco Vulkem Deck Coating materials. All Tremco Commercial Sealants and Waterproofing materials are to be installed per Tremco Application Instructions and recommendations. Please contact me with any questions. Kind Regards, 9 "j.B."Snyder Jeff"J.B."Snyder,Jr. Tremco Commercial Sealants and Waterproofing isnyderPtremcoinc.com • Proper application is the responsibility of the installation professional. Surface preparation,substrate adhesion,proper installation and other variables outside of the manufacturer's control are the sole responsibility of the user: Field visits by Tremco personnel are for the purpose of making technical recommendations, not for supervising or providing quality control. Tremco cannot be held responsible for material differences,substitutions,or day-to-day variations in the finishing process that may alter these recommendations/results. ^''L'�' pmCa, „ s.,st;�:aa°''Building Solutions IDENTIFICATION NAME OF BIDDER: Florida Construction Engineering, Inc. ADDRESS OF BIDDER: 155 Bentley Drive Miami Springs FL 33266 - . - . : 'EMAIL: fce52@yahoo.co PHONE: (305) 883-7601 FAX (305} 883-1514 . . FEIN#: 59-2768130 : ' COMPANY ORGANIZATION. Corporation .. • '' 'N'A-11/IE OF INDIVIDUAL AUTHERIZED TO SIGN: Hamid R Djahanshahi TITLE: President : : _ SIGNATURE: ,� --a' �. :DATE: 11/8/2018 : . . Jc,a • • TABLE OF CONTENTS • • • ; y..' IDENTIFICATION PAGE AND TABLE OF CONTENTS Tab A. • MINIMUM QUALIFICATIONS AND REQUIREMENTS . ' • . * Tab B. . • ;�:.`y. , ''.FINANCIAL STATEMENTS Tab C.. :.PREVIOUS EXPERIENCE AND PERSONNEL • Ta•b D BID PRICE Tab E: . . . • • • Tri 1 V2't z .. • • . . s .int.,:;.^ {,_ .. , t. •. AIA.Document A310 — 2010 . • • Bid Bond • ' CONTRACTOR: SURETY: , Florida Construction & Engineering, Inc. Frankenmuth Mututal Insurance Company • • 155 Bentley Drive 1 Mututal Avenue Miami Springs, FL S3156 Frankenmuth, MI 48787 OWNER: City Of Miami Beach 1755 Meridian Avenue Miami Beach, FL 33139 • BOND AMOUNT:'Five Percent Of Amount Bid(5%Of Amount Bid) • P',C)J CT:Waterproofing=Traffic Coating Services for Parking Garage Decks 1755 Meridian Street Parking Garage Invitation To Bid No.:2018-232-ZD I . The.Contractor and Surety are bound to the Owner in the'amount set forth above,for the payment of which the Contractor and •1 • Surety bind themselves,their heirs,executors,administrators,successors and assigns,jointly and severally,as provided herein. • The conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specifiedin the bid documents,or within such time period as may be agreed to by the Owner and Contractor,and the Contractor either(1)•enters into a crintractwith the Owner in accordance with the terms of such bid,and gives such bond or bonds as may be speclficed in the • • biddlrg ur Contract Documents,with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner,for • the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof:or' • • (2)pays to the Owner the difference,not to exceed the amount of this Bond,between the amount speafrfied fn said bid and such i:aroer:araount for which the Owner may In good faith contract with another party to perform the work covered by said bid,then this obligation shall be null and void,otherise to remain In full force and affect.The Surety herebywaives any notice of an agreement between the Owner and Contractor to extend the time In which the Owner may accept the bid.Waiver ofnotice by the Surety shall not apply to any extension exceeding sixty(80)days In the aggregate beyond the•time for acceptance of bids specified in.the bid : documents;and the Owner and Contractor shall obtain the Surety's consent for an extension beyond sixty(60)days. 1f this!fond is issued in connection with a subcontractor's hid to a Contractor,the term Contractor in this Bond shall be deemed to • b;,Subcontractor and the term Owner shall be deemed to be-Contractor. When this Bond has been-furnished to comply with a statutory or other legal requirement in the location of the Project,any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions • coo or:ting to Such statutory or other legal requreirler'..t shall be deemed incorporated herein.When so furnished,the Intentisthat ' this Hand shalt be construed as a statutory bond and rotas a common law bond. • . • Signed and sealed this:jzii_.day of (i_tober_ 2018 _ • v itoes•;h\ttest: Florida Construction&Engineering,Inc. By: ,/-1FY . ._._ _ • • Frankenmuth ututal Insurance Company ' _. -- MurmW 7 -,.(____>-- .....::-: --,--. .--- ..•:,.. . .. Y_._ : Jt Q �f, i v _ Waren M. Alter,Attorney-In-Fact • Tn.i v document Conforms to AIA Document A310 — 2010 BID BOND. THE AMERICAN IN$.TITUTE • OF ARCHITECTS, 1735 NY AVE NW, WASHINGTON, DC 20006. ' • .......,...„::,.„..:..„,,,:,,..p.i.::•.:.:,..F.,•:':•:::',.•::.'g.:.-::.:.-• -•.;:-.1.:•••,:',..1,:'•'..:,-•:.••::•••,••;':::::•;.•,.,.•'-'••••i,:•••• • •••• _. ,:. •„--;:2-•.'s;,,...,...-•,!..,-,.....:-.,-,:-.:!-,-• Y:...•4',';'•-:-.,..,• • •-••---•:',":".'"'.'--:.-. •:."'1,.: ...: :-%,..... .*-:--•,..'•.:'.'f;t,..•:•.....: - . .. . . . • '.'.• '; • ••-' t•. ''';,.••'......1:.; -•.•;*,-.•:,::-'.. '..•-•:‘;„ 'i-3,'''.'1,!..:•;...'.•......::.:.;,,,,,:-;:.'.r.::'..•:';''-r-'..;;;..... ....•••-, .,',:...-.-•••''.:4-..i• :••••.;',--'-!-,'•2-' 77. -----:;,..ri:':..''':::.:•:::::',::'':',.-1:•••,.,r; . • •,-'''.' ...:..•'''' .......-'-:',..:..'. • • '•;'•-•'':••'.-... '',:,,.: :;;;:!i'.'••'•:;t:k-..- :f•'•.'-•.:,••;::7•''..:.''''',...'2.1i.::::S6P :',111V.V.:••''.::..... ..1.• .......! . :: ,;••,. • .4-..........::: :.*:,:,. ..f,:;,..'....„ . . , :.• • :' ''''•'!' !.,-,,.:' '''-.-:. .. .... ...: .• : .. .:•: .. :;'':.:.:f''': :•.:t.'•;.'...'....••:1"2,..•''.":f.,''...,::.::•:;:,......-..j.......''.5.•:'':i•,:.....:•"...f4.'•'::::••••.',.,:::7:•;?:?...;-;;T:-.*:: - 1....' -. :.•'. " i............1..-. ..1..$,I.......-z,:v:'.".,;:--,.:...,•• • • '... . • • ... ...• .••••**..:,'..'•!•'-'. ....-.''.•• .- • -•: -r.-'.-- '•:....:.:J"...,;::.?,.!.-:::i:3..j:;„`,,..,....•:::.....•:.k,:,-:,••,.,i:....if'.r:y,',.,,•,L••••i.:-..•-.:;:.''.,..:..:•.,•• ..' :• • ,• •:.''•' •..,...":•.'•::":-••`: -..ve I'll ....- m-• u 4L ,t.INscR87‘:.•••t."....COMPANY.,:„-..,:.:=-,:,:,::':.::.:-,':.:.,,:;i,'.):,-•...:.!;„::.:'•;f',.'.1.:k:%:.:?',:.;'::t'.,,;:..5..;••5••••„••-•••:•::.-•'.:...:,:::.::••""...,,!•„..':-;:'•,,..4•..•.:':•,-,....,,;::•.:::::::-•-..'.'.,.,.:',.',:.:•:".•.•:••'”•••-::- FR ...„.,: ,. ..•-..-•,,y,..,,..:,:,••,•.;:•••.1-••....., -..,,I.:=,.t5-:•:•,-.;•••,,,,r„,..:•:-.::-.,•,.:f. ...i..-:-...,:.. ........„,,- .,',,,...... 'is.. '....:,,.....? .4-.• . .... . ,.. . . . • • ,• • • ••• • .. -,...POWER OF,ATTORNEY,:•-•.. :::::,.. .....-:- .,•...:.,:i4":-.:',-;; ;:„,, i,ri•:"-aii,71fkc9Fp,9F .! ...is.,:.•,,,,,... . .: .:::. .: . ::..,•:„.'.'i.....:".'.',..--:;•,:.•:.,:::...:•:. . .: • :',..1:".• • . • •...-::'.,•.;..,• .. ::.::• : . .,•:•,.::„,,i:..-,::::::,.,-;:..71.:.::.:::.:::ce.:;..,;:•;;;.,.inv:.•:::(01g,::,p.. p, 4,„;,::.,,•441i.,a1::6Iiif414.4.....• ...., .,, .. • n .-: ....:'. ...:•-•:"....s.''..••''.::;:'--••:".:.::;••••'•.'',.. .•,•• .••••'• -.• I- *.s.:' • • : - - • :•••••,••':•' '.; .':•••iiiti'Mui41'..,1n:$1-T.P .:`.7'1.7g...:Iii.l moiAtA;Y54:.$.F7:k:;.....-:::),,,-7'f",:...:••••.:•'..-,... • .. .,- ,',:c„:-•".s::•;P'..''',....i„..,-:..;.•.;.*:?..;•;,,:. -...- --:•. ..• .. :. 0........., ,,,.,. ••• ,-,kis that Fratlk.erIt; •. ,;•:.,,"... iA•i.i.i, '.0iiiiqPP- 9'....,•: •,•,:.;.-:'..'...•••-..,-.--.:',-.:-':-.-..-:','...:::.)„,;•-1; .:-i.. .-Y.'''.:i:;J:.;::'1:-.;':•:;;;;::::::-....'.V.,;''........;9•::.'!";.:,..:.:• ...... ........,.............'.:', .:.'..:!.";::.;•:-.;;i:O...;.:h?-.:,Ati,m. ,.N..1....A.(..T.K,,,.,.:.,F,--F-.., ?.7,,...i.,..,' ii.t .oemictligart,-"-:7,,....5,,.... :.:..,:-..-:-..1 ;.:...,....:-:::::.--,:-...--;i„:.:,... .............:.:..,,.:;.:;....- -„:.,i.:; ,...,.....:c.:,: :::-...;,..i.,..•!.i..:...,.:;,..,.;,....: ::....:::..:.,.. ..,, ....,,..5..,„.....,.. an . . -' .•....•' .. -- d and existing ilictei...t?e 16ws:°1'1!9'' • ••• --• iii'' •'•-•••••''' '...••••••••••-•'',.•••,;:-::••.'•:.•..,...i;;.:1'...;.'..."::::'1'..:).•,.:,:•-•,..• ,:::,;•:-.i.....,•.;:::::::.::'.:i....•,•:?.4.!-;j:i•••••••••• •:..---;*,:.:'• •,. ;i:.:•,..!.!?...•••••.• •: ... r.••'...::', ...-:-.....:;-..aillYorga".--' ••: • -hereby constitutehothinatqi: ..::••;•.,.. •- .',.:.:. .;:. , ... .....;: .........,..,,,•„.i.. ... Dwrtuspi...4.,,,...,......;14.•,..7;.:.,.....,,,..,„,...,,....,..„..........,,,I...,..,.T.J........,......,..„...,.:„....,...,...„...„,.. . .: 11,:"...............rM Michigan 4&787,..cioes:a.er..: )'. .:.;..... .......,-..:.:.,, .:.... ..... ..•••••..dii..D4vitt.T..,.,-q1r1• : ...•;:,:..?•:•:•-;;."-4•1.. ."; ....-. :••.,'..,..i,.:. t.u.•••,z5.1,---?...,i7.- ::.?.iiii--....:.'..,.-::,...„•••••-•.....•", • .• • . • .:-........, ::•,:..,,..,,,..-.$...w..$:,...',,.. ':,.'•-•:,,'..:Warren••rvi...-Alter,,..,„J91... .„ -,..,,,i•::.,. :::...,•;...,....:. ..,:,...:.••.: . •:. a to make, e ,.,•,,,„,' e..,01•d/il,..-bne is iiaiiaP4, ?9...1"..:.„4.,.i.--,-:•,.„IiifitAilaili?:tY,;:::;':';:;,•:,:•::. " :' •-•,.:7.': ::',... ...:-:".:::•-•:;'.•-......• .•-:: ••,....,...... •. • .: : • - ' •. • ': '•• :(iapaoity.:::1,..-...49T,••:.:--,:'...j.'.'ih.:.thg..650agHyP.,--.13-,7„,,,,.:r.:-;;;•::....,;:7:i! :',....::: :...,.,..„•;60.:•",:.:...,::...; ;,..:...:.,•,•: • ''' '""..''''''''','''.,,:;...:`,....'. •- ••`-' ."„. . c i...•fact,•each inthair separate.. . „... ,...:...„f :wi the.:-..;:::.•,•„„'•,,-..np•-.7x:5,--1.-•.;-.7.1.,..n:,...k,...1'4:-.7.:.,!,:-.••••:.,“:',:.J......,...:•••.,..:. ..:', ' •,..'''': . ''''••:::;C:‘.........:';' .••:' - ....„.• ,, ...-----, ,- , • . under ,.....,suretyship,• ......,:-.;_-.•,.. d.:j ,ist.1!,..,.. ..,1,,uz,_7.,F;?.?...,•:-;.,•4: •,:;..:•;..i......,:.:....;.,,.!,,,ir.•:;;:.•.:'..;„......:.......„: :.... ackno ',....';'i.h.:.e.:.k...:.true and 1'.'''''1"1 att°17eY ')d'- 'bonds contfakIt.s:..a,..id r.......,............ :.,....•.. ,..t shall yk9...!... fs.y;'„....y.i::;,...:-:...:-... •••:'f.,:.-,:.g,..:-.;.71.'i-:''..'•,.;....'i,s-C•171,;;•-‘4.-.)::„:......‘;•:::-.;.:;.(•:.'.?:?....;:-.::::•.-:.:',;.i..C.C.'; :.•- • , .• ..:.;''..,..:. - ,Aid.i,•;e and deliver any and allai ili.e o(1.-16-.1 sniP 6f 4r#..01P;sttI......71.::........,...,..s....J!.......,,:t....,.....,.... ,..'.i. A,;•0••••••0.''... ,; :'-.•'..•';':i.....!••••. r.,''1.!.,',.;,..:••:::!..,i..;:••!';,•iifit:i.,,,T4-•-,:-;:i.1,1,,s,'::: :;.;,;•••,... ..4.,,..... .,„:„..7',...-......• •., ,•:,,...,.......,,:,....i , ..,.,.•.•-•te,pro,..r.i., 0i 110,.. ...e7..(41:',....,•.:•;,••' ',''., . •.:;::":'.1:f:.::::, ...... ,,,,.,,,,,::iiiktii..001(*( 4.0;u9. ..!.„•.•,::....f7•:::,../..,;;:.-.•.,..,..,::.;•:.:„':.;:-.:::....,:..;......'......,.•,:....;.. .;:2! ....;.,;.Wiet6/$•:ipf..,:-:::.•...:::i:.:.-:::•:•:......:;,'::.•,... ,..••••'':;...;;.''..3.,...:. .....,...i:-.'l • '.... ..,'''...' •..:* •••••• :'• . ...-- .;• Forty•Milifon 3114-Vt 'u':•‘..'•:''....:.:-.-:':..:•...:'''-'• ' '..'''$•"....;''';'. ,ethel3PaNpyi ,....-, ,,,.....,,i„.:.,,....;.,,••-:-....,...,;::: ••• Frankeninut -• '„,•••-•:,,-.. ,..,;'...;:.•• •.,,/:V•.'...• ' .• • • . - .: • .-: ./• ••:, • : .,:::-....:..... -- • ..... - • -..... .,,_at:.i...,„„qt,ing..,..,..:•„,..,...„.„,•:,•„:.,,,.:.-.•:,...4.;,,,, ...„,,,,,...-1••,-,......••,•.:....- ,......„......„,.... ;•'''''''''•.:;.:••::: /';','•.:!;••' ;•-•'':'''• : '• • '..' :.'—' -'•• ';:: '. • ,•• -...;keoi•iiiico.c1415,. 4'v!!'.f.;:-.....4., .....•:•;.,.....,•c::,;,..,•••••,•••..,•••••••;-• 1 &:::','„...:41,,g:',...;:!:',.•;:••;,-•,::::5:::••••:,•'•••'..'I'•,..:.:.•';.:4.:- :. .......;... ...„.„.............. .. . . . . .. .•• .. . . . • .-..•::::....., ',...',:••':::•Y,:'....,•••••..x.:',,:;,;::...„.::'.. -'..: ...•••• .: •• •,... .a...it-ed•ilusuint to tper..ollol..vm,.,. .. ...... ,.......,..:..;......:.?:.::::.;-•:.i`.',.?”i.-:;.,..:.....:..1-•i:,....,.f......,,.,.,..,'......•,;;::::,....:.•;.,•:,.....A.::.;i443.,..„:;m...r..;,.(.,,.:ii.: ..;;,,,,,,:.T..,;...i.;:,...;,..:::...,.;...4...:.......... .....,.....::,i,.,..: ';'..••:••• '.:' ...".....!''''.:'••;•";:••ii.(;\,,,,ei-Of A107.1Y i ;•?:•• • • :•:-;•....::' '..-::''' '.'1::''': ••••••..• •-.. '::::•":•.:....''..;•..,:"..,•';','-:•,!::fc::: .6..iiri'..6..d.C10,:0,..Fg.451---c..45,...'•?V!if,..'i•:.:•;•.,.....4`',.?:.-:::. •,,...;:!,.•••,: • -•-•.; ''' ..''i.•:-.:':..k.',77111• •,•,••,:',...'.. •.Mutual,1„,11.tar,ce Company:• .: . . ... ,.., -••••••::,, • •.. •••••••.: President...,••• .ancliaPPEP....tt4 .? .:•.'--iaited15y,..r...11aS..Ef.„.....,....:;.„.......,:..,:-...,?,..f.-...s.-....; .:,•• • !.4-.,::-.-.,....!•;ii.....,::2.;,,,,,-,-'.:.......T,.:4i..''... :1....„:...,..'„.-.......... .: . President:. ---. ex , .......,..i.,... ....f.',;;..: •.;f'‘.-'...'' ..'-•p.D.:that III. Se or '' of att°1-ne.-''' ' • : :Company, ....,._:",.: .6iiiint'ai.::: :......-'F'f '...'.:....? ..•.....''!'., e....'.. . . .Z...... 1:1i.t?i Vice..PIT'--si 1.1 ...• - .• y•••••a4ctsuckb.:.a.4 9...........,......qualifying,the..4. 971...........,..;....,...,..;,.., .......:.„.. ...,,......:. ...„.A.„.,.. deed ...--It4,--.:.:•,•,.-4--r..7:•:-..,-.,.:....,„,•••••......,:,....,,,,,. :. : •,;..J.;f:::::: • ::',1:3‘.7.•'.i.••iittS01?V.:.-- s ...„ : s.: •Lidlorited...to ladoed bY.aTly.9'- :-..,•:.... -.........,..::• athe.:Aot 0•17, . •ip,t,••:•:-.:.%..kvd.: e211.:se,:::,-.,:.,,,...:•-•....1:;.....;...,..,,.-........,....., • designations''''- he'' 'Y - a • a attested or aclult? N'.. .. f of aiia.4Ck4iWIe-dg .. ,,aq614.i.,triql:cgT9.5M, ,.1-,'..;:,?"',-•-•..'.::::::•:::::',... :::•,..:::...t :',:". .....":"T'i7..4'';:..„ •7 ; .,si 0atizre,1.11116.11 Tay-°''.,•-•„..•.--.t6 e, -.•..uto...pri 1?(ti•-•.. '...-....4tt,.si44ii:PRi.:: . . ...i ••••;;:-.:•*1.:::.Z.:•:-.fif.'...;.:•.'•,1:3..i'hirlif7:•7.:'... .;.:-..:.::••A..,:i.;.';:,-execute powers.: ••-.. •any 1.,....':•'1....-.'.'....-.: .:•'.•':,•...: ::1.;::•.. .qF. 11 .."1'.iihnit..poi&i.el.Q.f.4(1?n'•rY'' ::,;enti6i5.430: ,,undertakings,•-••:•-• ;:;'.:::::•-:::'':,:::'-::'•;•,!•::..I:e;"..T,!?...•:f::Y: .,;:', :;:i.,,•••:::•;:4 . .,:.- - .-:,:;...................:. ffieer of the.. -... ,.:...6 ,,.. ''..' ',,......•-, ,::;;.••:.:.,.::....iiOnled..m•st u.:•4?...;.,.. ...-,- - . . mnany.-:64)•4111 bonds.: '.-„.. .:::..:• .;. ::. :,;•:.,..••••::.....:•'-•• :',•::;.:.,.,-.:,'•,:.-:: .::: • ',...!.,:i.::,,,.i'•:::..:-.:-........:::F:-...:i...i',...'::-::.,-.:,4aftetts144:4•5...::,,,... '1'.-:.':•••:'''''''''''4......:' i"..:•' etjak:b,s0.14' ''': 9:,.. ''•':•, ":":-••• -i... "''•••'-.:"';•:....-.; :• "f '': ......'.',. ..t.7.•''L':;:::•••• . .-;:.-:and a..,..:,,-6trijkits:.appr9171..!sL!......,•:••• ••4.,:....-:,..:,....-::,,,.. ..,:„......,.:::.. :,...,-.....::•:...:-:•.• ,....•••-•..,:.•:.•-g.,::?....-•:::,.....,•,.,•,M• ,:,••• ...,..• ....,„: .,...i...-1.-.f...,2,•••?: '•:,. ''•• ."' ... ••: • ••-:.,„..i. .....- : :.-.: -:.•4:-:..i4ie,4;6144..414, .-,9.,,,:•,..„.,::•••,.:-.:.:',........',::!'„,..Y•i:•:.,:....'L5;-.:-•••••:-.. .•••--,:......;.;t: :•::••••••,,,?...ie,::.:',,--,tc:'•:r.:;.••,,-,•:: ::.;;:„::::k.:-..;',:.•,. ...fi.,:;,..•-•c?-,A1.1#!to-:;.. .;•-••:„.....,:•..::, . ;.: .• ..'••-_,.. ,_,,..',...,-;ised tiii;Se:.PY,PT4s:' :t.:!••...-.;,-:::.,-......*-;;:':.;:•...!:-:: •2:1'.'''I''jf...j.:',......•:7-.......,.•::'...- .; -'• •...4.!•,.r:::'2'it': ;:',371;F:!;;;.-k.1.. ... :.•'.7•••••:::'•:;';'',... -. • !.....,,,,,,.“14'..-..'.'!.: ,...,'.,..'...:: : . -•-,„.....,.,,,r4. tii e..,...,ompety a..-,,-;.- ;,.,.i.„. •. „......• ••:::-....,.......f...„:;;..........,:,,, :.,.. .,...•••:,....z.z.„7,.•...;;;: .:.*.r......:,,...::...-„,......-,•:::-;;;..,';.-,;.,•••:::••- z.-;,;.. ;.,;:t.2..•:-...3:%•::.:,:!••.•..c..3.„ :,..,,,..:;,..!.:,::•.....:.,.:.;•.:- ::::....:':';..:;'••• •••'..:.:•••••.-1•:-.:, ,,v1.4s8 W.El• -c.-."'-?.:.. ,...••siti diy.bf May. ;"4!'-'..Y,',::•", .-•' .....",.-.';''....•... - ,..,...:1•;:;,'";?...--''' '',•••.:3iliiitialitefg.9W.-„kg.',,-.4-.1.j.:',',T...":.,;;"•.:',.........f.;/,':';'''Y''.. ;• ••••••.......W.,,-.4pcY.. -'...• 'ii. "1, r,•iintii'affie11 this 1. -,...• .......,..,...... -••••-...:• . :.:.•., .. : . .:.......-...ii. ikiiiiiO4..vajpk...,. .,,,.:,..:. T;..c.n.7.,.,,;:„.z.:.•,h.l.ii,,,,,... ..?.,,,..,s;:ii.,,,........„....,,..,,...........,„.. ...-... . ••....•:::.'...........:',•:::. :•....k:::::::'656.0.±.0P::,s1-1 .....`',..,,-.;::..i: •: .•:•.. . .. '•:.:.,,.. •::!.:. .....,.....-!;•,- .: ..- '.....-:::':::f ,.., p,.......,.::::,.:,••,,.,.f..y.s....,•1'•,••F?..'.....i,;.;•,.'..,',•....::.,:;.;,..,,p,- ...,ii'..• .,...,...•,:,',..;•.•';,..:',.:::•:,...2.:•:;..:. .: ••.,. ••••••:::::•• ••:•:;,•..,',,',,.....4 .}1-•;.':;':..-.;•-•... .:. • :-:::'..- ......., ::::':*; ..... .q.:*'...•;; 3'.....-• ..''. i:.:, '•;:2;1'1'•s'.:•::,,-!:.: .• i's:,;.: •• . '''....1...':. '••• ..:. .. • ••:....••:: -....'••••••.•:';'.y ..---..1,1-',.......,..,•,•:.•-••...ir.:,•••• .:±„...:.:•:•••76Ea.'••••••:0ii;•.::;.::::..i't;;i'- .... -1;'.1- .r:,•,•..;,•;-'::•4i;.i...•:....•;:•:•:2'...:::::';.!;;:,,•'..i.:.•••••;;,::!.':.1:,••••'.. .....i.';;:••:;••},...• '''''''''":::':: 1•'.....'1'''''::.:,,,',...k ......' -• " ' •'.... .." (seal)....-':". . ..' •••••• .. •• . • . •••• • . :,.......::::: :::,..";::.:1Fro.400...A.:,5.ttf bii..gigiklPfg5F.4';', :;.'::::::: :::.1,..- -..Zi'l,c:... •••-••,.....,;•...g..,:i.g • - -: ' .il-''''':•'-'•••:.•:'••••:''f-'': , . -,f•-•.• • .• -::::.,"•:.' •••,. •...••••• .....,:. ?•"•::. "..'; .':::••; :•':•.•-., ..:••;;;','...President ,,i..-,J,•,..•:,•....::....,..............,..,.,,,,...„...,:, .. ,... :.,..„.......,,,,.:::,...:,, .............•.. ......,....,,.....‘....,..„,.,.,.,..,.., . ,:. •.• .,,,.. • ...! ......,4::3 i.,!.,...,:,,,.,,..„.„..,:,.,-,...••••,.. ,,,..,••••.,..,.i..,•„,,,:,.::•..,.•:,,::-.,•,,,,,,..i.•,...;,.,„,.,,,,,,...7..i,i.,...4,.4:,?,:,...4,••,-.,!!:•...:.:;„..i.,:.•:,„:,.'.....:;:.•i•;,.::::•-•... ...::,.:',::-:-;....,:.,,•••,...•••f•:;.•:•., .:.....,:...•••••.•,....,:,...i.,;-•••,.,,•:..,..-.:-::....."•-•.-:-. .. .. .:•,......-. , ...••••:-.:.• ..,'-• -:-•••... • -• ,. : ' ••••••,•:,..:.•-,•:,...i.' ',. "••••.••;•••••',,..::::: .••,:. • ...!,.-••••• ;,,'‘..,..•-••••';',;:',..-::•%••••••,•,:••• ••:••••,.,•- .i•-....,,,•:)..,:•,;,..:; ;-,,•.-..,.'•',.., ....:.--..,:.,..i,:,..„......,...,......f:-. •...,',': .,'..;'-'''.1..,:•.:,,,:::;:;,_,:::... •• ..•-- -•:• .. :•,.........,..•••,.:Y, . .7.--.. • • • • ' ...- • '•••• ••.'• .,•.-:.-;-',..:'--Y,'•-•- '..:'2--:.:.';...:,.:..--',--'-'; ',:.;:i.":-‘.-1-.-,'''•;;Iti'z*Iiiifichslik_j.... *('-,:!'".:'::'-i'.::' :••••'.... ....i ,•;:y". .....,:::,..,.::.2,."-7•!:• ' ..:•••'''•-•::,.....•'• ' ,•• :.. • •'',:- . ,: • : . ... .;,..::....:-:s'- I :•.:*••:-.:.......y.:::*.::::•••• ,',;f:-,••':::%,:altY.16.itiWiv,4:Ye.-...-m:,•.:=,4- mu.tftie."•,':: i:::';;;.:4:';!-*.,-,4::;'• '••• •''''''':" ' '..1':::::'''''''''' • lEfl.-62'''' -t '• '' • :- : ' . ' - . . - ••-.'"'''. "-:'''"''''' 'Jr,••: ,'44',:t0g11:C.P.941...:A:!...,:-•. ,'•.:isafff.c.er•::Y?$ 1-...- --*.ii.!t7., -,4,-;.:: "'. •': '........':::::.....,,...:::::'•:1,..••••••e-I.01-1a...4-.7frt1-..efi,...IrOc•-!kSA.:.(:-...-.1N;2^1''i;' )...a68..::. rithe.siate...of..mish40..;;h-;.Y....,..-F...r.e..d41CiC:k.-:.NE;.,44..thihi4ctii0:'...6'ta.'7Y..8.a....:iO4.‘.1i,•15',. ,,, = , -:ri-4!;7.fi-!;k•-•1,•F•4,.,.:•.,;:c.t./•'-5:,•••:'•.:i.',...i'i''.';.5-i!..'7,•fl...:.....:1!..?•''.1.'.`.:1'!...::.:i...:::' cised'ani44.. ..,-.7, ....: ,. .,.'••:•,.,:..:.,:.!-7?:!if.,--:......1t,..if4rs,,.,,,,:'••:::-,••-:-L'.:....,,,':,'.-;:;:,;,..:4.6.w..::::,...,5.9,1-..-..-,,,..:;,,....•!..,....-.::'''....'..'•••". ":•-•• ..:••••••••::, :-,,:;;;;:',::.'. -'-. . .• :,..-:,.. .N06u-y•P.4,--1c:,••.•••::•.•.'.:•; ri.i.',.,...ircsttument,!lap ,.....- ....,..„.N,.::-.........:,i,;,..:„!s.: ' ..,,,s,::.?...-,,,,r47.y,,,.., -,.:,..... ....,::,..,I-.:,.............: . .-'.- • di6-'10.before.m's'....'• ••••.-•;-z,ut,.4c1:the 13,1:''Pe`-'.;.P.!;47,•.' . ...,••'•••.r. . - -• .: -,•.:..:4.•-•:.-...!.••••:.:1:•-..,-,.. ..:..:,.:.....z-:,....•,....".i•••:y-: •,,.......:.e.:•:,:f....,.--3:.....,,-....,,!.!....:;1.4..„1,.:.-:,,,,,..„........ .........-........,....•,...,...,., .•:.1'....:::'c:..1-...;;;:••.:"..41‘,'!'.,:„"T.,..•A• :',,..r-'1..•e in aid W:IP 5')'". t..'- ii•Vbf the:coq..IP!''.:•..•T:-'::..:....-. ....:';•.•,'.A:.-.'':••••,;.'";:.,day..••i'. ••••••.:20t6...,..:.:•:,-, ;--e.....f:-.;z:•t-,.••••4...,!::::::;;itfir.•;:.,..-;,..:,-„...:•.• .:':'...';''''••••J'': ',:i--•';'•:f.'5914.E5"4 '..'13-,.tu,••••'''..3id.inStrunien;ti:si:•, 1-a,`. .... ....r.":';,::....-1..... ..•:.-'::'• .' 7.•••,,;;ci''..a...s.- '1,•thl :1$*: :.':? ,,!!.55..7.,':..f:..........,..'•.:-..•';.,.;•:.i::'• ,;-iiTt.ztiLi.4.1.-,:: : .;: •:.:7•.!-Y.-.7'.',•:J::';,fi'T.:.....6'"..• s 54.4°6c:T}i.... ''. ''' ''..'.........:.....1.t....':'....:'' '''.......si4-..rtiv filid.pnd.4ff.i.0d 7Y..9-....,.:::••••••••::,..:!...,...::.i.•:,:::,....;:f::::::.?:-:. .J.:2. ...1....:-1::::.'t;,.k.C11: ; ..T:t .'*•0;, '• ,:; ,3.,./• •••;••• i!; ;,.:.. .••.. • ..,-; ....•. .1,,.....,,.i„ •.•„..;,.•••••:::,:.....:.:...;:,....":•••-ii,;:'7:•••• •:..,..,.i'!••,,f;::*;:":•••••''',73:',44;!...-.4;-:,.«,..-4'..2•. :•',.7!..:::...:;•••••••-.....,:%',:iC:'‘'.::1 ; .‘moN11,W:11:11: FA:T"71.' ....'": '......:; :.....: .,.',..:'''.'';.':';'.:i!,;!!';:'.'..N:.':%.,::,.....;;:•N:: ..: . ',.....,'l'..rXr:'.1?;.;':::.'f!'...:, ..'''4":1.::'..2 '1'...!. .K....4.-,fer..7.4!"..;..... t',.....,::1';!:,•';t:V.';'-'' . ...!'..‘.:-'.., 1*7: :,k. ........ ''. :.r. 1)47. .e.._,,,,,_:..... .....;,,i.:J......,;.•,:,....-J.:-....:.:.,.... .••-..,.. ..-:,:.,,....:.s..,t. ._,.... .-;f..?:•'... ..:.-.•._ ...: ..,, :,, ,:i. :.!?....7.. -.;8:...,.i.sr_..-) ,...1...-,E,7:,. ...;!,...„..,j:........,::,:.:::.:::,. •:..7,,.... . ,-:•:':•::'!'7:::?;....:•:..,:n..i.:,,,..W !..... ,.....*:... ....i''.,..;A•i'•:...'t;• .7.---,..:7L---•••••:•.• :...:.: :•:: .:::.!.••• : ••7:1 ..:.'..".•••;.•''.''. . ;,.......;•.-.,.-...'•• "..''.::1,4•.,'!.-:.:::: ' ; ,.1;.;'.15::::?i71-(L.:.5';;7;:.•...;.',S,;:•;••.;:.':4C•F';.-S:rc.' ,....:.:-,'''::-.. "..•;.. .'•-..1.;':Z.'1:.:::.";f'!:•;:;......-:,5:.,2-::1.-•%-'•'4f.• . . ,,ICIZire":-;:.' •:••••''.•.. • ' . . • . ' '.. '. •:..:.. .'`'••••}';..'...''' • ''• :. -•:'••'.......:''' •' ''..'1:......'"):;,',"'•''',,:,'4::.::-1--.WIT.gi.:::':':........j:.:-..•' .':. •' . .?'':'..'''';;•:•'1.:..j......•.''')::*1..::•';'.1:;• ::•}51.171-3-117.(.1.e. ; !•.'•".'....ik(:illiall '' "...: .•:.:..•.:. • :. •"...• : .• '• ''''• .::•.','.':••:.'.....:....:•"''.*••.''.... ::'.:•'i:.:.•''.:'''''...''•:::.•;..7.. ....•!i':•&;-"..a:5:;'St:° ::.4::i". •;.''.;•'::.':';..',•••• . iti).4..a .•,'I'..''..1.1s:';‘i';g'..:::.:•j'.*:!';';;:.4.•giiif:a?1.;CC).111 ':'..Es"t2.4.!'....c:......,iv,,..3.,.201p, ........ ,. • •. ..,..:..•. ..:....::;'•••••!..,....;•::::.'".......:.'.- .:,.:... ::.••_..;, ,..::1 -• ':•;,-,.;-,',...W-t;i6,(rtn*4,!..fajp1,f7 !.,..-i•• :...::::::'..1(!...,...::•.?; '.........:i; `).•'..-1?;,•••:::',::C4zi-ii,r,'•:.•commission r.xpnes...!1.1...." ..,• .. . :. ...• ... : :• • ._ .,.:., ......:-..c.i'......•.::.:;..''' ', i4ii,kdfttvyT.p5::.1-11,...,f,....c .ez,„1-4,..i,-;di,10-€1,',..,5..,..?..,,,,, ......,.. .:•„:;.,,,•; •• •••••••••,..'•.....,..H:........,.- -.- •- :!-. . : •---• ' - • .• .•.. . • •-••00ftiparty,..49: ! :..••• ':'.. Aieri•tevec99,..9 : ::.7:,.1 ,--•-:-.":','fi.-;•'..':.'..7':: ..' ' ..-.:-""":': :-,.......'..•":',..1.;.'•:'.-.,:.,•„-;:-.."'-'1'.';',.*::!':;FI'' ..::.... . . • ----:-.: •-. •....-;• .:. ::: ;'•F•:-ra. ::11."k' d'.n-rn' ...11.ih*M1-1P-14:Instir.LS::1;Ipso'i';*-:'•6•••.44,tciiii:..,•,:04:i.,..P.,..st,..'.,„.11c)::-,..-.1,...,--t:::.,•-•.''....'..!‘:••!:::.,....:',.'..:'.1:.'...:::•!,.!!!'i,'4;-. . ,:i...-•.:.'.,-,..".:••',.."•,'::::iefi,;::•:-...'„7::•:•:-.,'..•:-.....1;..•••••-•:.-.:....%.....'•.:.•:;:i• r :,.....-:••-•,'i'•;•••• •;•'''.'f';',.;',•::.. .'•.': •a Vide..Piesidtnt:9'.. .-••-:.;.i.•', ii.tbrixt?'.'014.t 1.... ...'.';;t'.:.-''•'....f.:'....:::::••.:;.••/.-2•.'''..','if.'"..:•::::••.; ;;:....::::.::".v:.1. ..;;•.•4,..1:•.":!:,;:::::',2•...p.•• •••3-:. .....,....;:..,-,..'„.r.....„, -'....1:•'',J::.--'4'71' c•!.".:&•ntider.siggP`'''"-.;•• ;v..'iilla, Pow.• °-.:....:, .,••••i••••:-...... ...i...'',....,,..;....::.j.;.: ...... :'''..:::.:-........'.i..'''...J,...:*.•''.•...•7:.':',.-..'''''. . l'......:'''..i'zcils'..,..,.::::,,„;:,..,..-..,..!... .., : , ,..,,,..,.,/litiliT.Ie'copy0 ::-..: original: :.•,. -e..::,:.: :::,.‘:•••••?..:',::-.'.' •••• :E.'.. •.•::: :•,:f.:::::::::. ,...!-....,..••••••:;:::::;:•-:,":-,...•.::::.,..„...,_--:.:,......:-..;liv:.:•-kw: 9".. ..0 0..„--::::::,!:.:-....:-:. ,...,:::04:•:...•;';,:.!-7.,',.-,.;•:.. :.....', ritk " '' :.'''(i''''ire' t.'a of this c1";::•. .• . I:.••..,, -..-..' f...„.•:.:...:.:•......-.-::, i.....:,..:,.•;;.L..ii,.a ;;•t;114§,..',L44.44.,i, '',: i.:•••••:-V,'"';/..42X-51;,7:4.. ..-,..e.',.''..'Z'..i..?,.."53'.;•'" '...:.'•`.....':::•....'i. :::•::;.i.j... :.*::!....,'. 7,•iiiift.ill•itcef:all...e • .• , . .....-- • .,'..-:.. ......... . ....;....,;a4,4,*6d..the Seal'.o.f,...11.:..t..,, ,;,•: s:•4g4':.'•Ip'-'•••%.'••-,f1;i'''..;;;.•!•.::;'''''..•••ad-li-'4tY:-':•eg':*?-:• ••••';'.:;',4,,::.';•,..s.....:'•':!;.Y•s.:••' .••••'.......•-:;•:".f.;::•'.;:':''''......:• . .... . '. .: . • ' ' set m),'hand a??9, '-. ......:::•::•••-• • ‘:r..-::::. . - ...,.:. '!'•;'.;..11'.- :.,-...,..,.1.-,'f'T;:.'..••'--,::::.....,Ir-,-.,w.,....7„,..,..:•,,,,,,;::.:...,::'••!:::,..1,•:7:ti:i',..,.:::,.y„:::.. '.v... :.•..!..-:'...;.::„.-;:::-...,-,. ...-.-,4.,,,,..„..; •G"';'N7diFIE a Eci.F,.,j).T?q, •., ...•••• ...,....1•••:... -,;...............;,'.••••':''''..;...,..-.......,-;:,,'.....:',;'5„,,: i..,•••,' ... -...., ''',-,.'..•: . :.;• Precesident -. •-•:..:...::,..,.:.',-..-4.::::,?...-.:......:.:.,....,,,, .......... 1t WITS Yi....-).-' ...•t•::•• ...-..'..if :':::: ••. ..-'•:-..•, 1:•'.',.,,• •.' •,.•,-•-:...:' :-..i.;f,•:..!•'.. .•....,...:',••..,...H.:..li:(44.*;yt ...:...,,,,.:,.,1:.,....:,„•E...::.;!...-..-.::.;2;::,,.-•.::;.',.?::,.4.:`,-:::;,,::',,,;,:::-,:,..:,......:,......!..•-,,,..:„..,...........i',.,;-; rew 5. !...,....,.. -.4...........t.,.,z.i... .,....,:.;.,-f..r.,?:: .....-._. . . . .,...• -.;.,:. ...... .?:,....,;......-:- ...-.-...:.4.•!-::.:': • -....:i ,.........,..::...i.',..:i;.:.......;:":„:.-.J,... ,-.;...........-:-.......,::.T.....:.„.......::...:,'..,..... ......,„...,t.... ..:-.,..4::!?.,,....,,!..iiiiks/4.: ./4.::c9:.. ..:14......4:... ... .: ...,:::.,,,,..,.). ...,......0......;!'..i,....,:..‘. ...,.,......... .. . ..:::.: .. -. .... : . ..• ., .: ...,........: . ... . : ...::: :...-,,.-..:::.........;:::.,,.... '. . -'. .a...6. .1- r51;-:§..gOPP:11.f., ;i:i,.;,.: ,.:3.5a.::; , ::...,.h..:::.... : .-...::.:....tii4', ,--•----:.'•,-•":.-.-•'::'':..'..... •prAphigm4,---,.;.,::-:;;;revi... .,....,,.,,,:,,,..7•.:e-.1,........,::•-•,,,,,,I,,.4..:ii,..1,:i.:-.....:,.F,.., -..• ,,.....:,:. ,...';.--. ;:....,:ii'.7!.'....!6'..... i. ?.:.c.'.::.' • •. • -. .. : . , . - . •„..:.. .,..,......::..,.....:,.::;,. ..,, n;,-,;,:ii:i4:111:13q.:TIP:•. „ ., •;:..'/A .1.!;.•:..t.:...a.".•;•;'. .•::::.: -Y•Az.N.".1::2... in'i:"i':-•':! : ' .14,'•• '''...::-:':'. .-i7i:::'-':;';':;-•'....... ..:'': - . •:,' ::::::•::_:- ::. -.::'4 ;• •iFt21:11:1-V!.k!!`-'7f.:.5'... .,,•.P, ;:i••:j:.....:.:Y.147?..:; •'......-;.:g1;.:::A;:•,4.k ..0::;•:.::: ...E,,,,...,:t:f3.1.,:ff-j,,Isz..., .vt,,r.,...2.7tx. ..-'. '.:•'••• ••:f'S...??.1!:":'...,.•;',-,a,:s..-, :..1.: .: . 4'15W,T.DI.41.44Ac.F.,.•;.1.... .--;;;;,-4,-litrAlf.Y11!1,'-..., ' . *.;;.:..,:iii•,-1.%-', ::?:4....!,•.::.4ir4;-3.') .- : .,..'lf.;5.;?- "-Z7,.7....;:: piikiii:;:.,' Oif.. ,:!Ol?".,..t';'cl:7....)iiiik7)31ifrg:3;;;T11. M: -.•••••:,-.- .•': :2'.••::.,.•,:::-#.4; '•-•.',.. .•••' ....F!','.;.:...'.'r:.•';ii.;.; •',',•'....'":•:•••••'.--'.:. *.".......?''.'.i:.'•-•:-I. P'''.'1':::,....:"1-..:•••;;;,. ...',.::?•'•:.: :-.'•.k:. r/iiliAZi.ti,&':247'1...:'9,..'-:•t7'' l'.."?..' .1."..-.-::.:.;.. •';-7 .'•'.''.'''.'.. ''..... .:*:, .]- -- -'-'i•-..:-,-.7.:';,:'..".i:,.. ...,.'•;.... '...::::::".:,....5::::'.. .f :-......-:-:",f;!-4....•5:: .:;:::!ii-`,:';',. :; icf-..-- 4-.:---:•.•• - ` ';.•-s...:::f.:...- '-''''....: '1'..'•-•'•. . • . •.• ': . .. .: .C.., .. '..-1: .: :.....-''. '!...;.:_-,.!,.....i:, '-.1.:::,':.-:-:'..?:::•1::.'..-.!.-:.:,:r;C:,..-.!:.-----.... ':.''''. - • - , ._. • :•:-117:-.1,-; ...z7.,tlii;•••:::,,L..-::. - .. . ' ,...;,.?-,,,. .L•:?•••.-.-..-t,'...i.•:'!.-;:•....• . _______ • • MA Document A310 — 2010 Bid Bond • . i CONTRACTOR: SURETY: Florida Construction & Engineering, Inc. Frankenmuth Mututal insurance Company 155 Bentley Drive 1 Mututal Avenue. . Miami Springs, FL 3313a Frankenmuth, MI 48787 OWNER: • City Oi Miami Beach 1755 Meridian Avenue , Miami Beach,FL 33139 • : . . Lk(31 I I AltiOli►f a: Five'Percent Of Amount Bid (5%Of Amount Bid) PROJFXT:Wsterprcofng-Traffic Coating Services for Parking Garage Decks 12th Street Parking Garage • Invitation To Bid No.:2018-232-ZD • j The Contractor and Surety are bound to the Owner in the amount set forth above,for the payment of which the Contractor and . Surety hind themselves,their heirs,executors,administrators,successors and•assigns,jointly and severally,as provided herein. I The cariditionsi of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid . ! documeets,cr within such time period as may be agreed to by the Owner and Contractor,and the Contractor either(1)enters into a contract with the Owner in accordance with the terms of such bid,and gives such bond or bonds as may be specificed in the bidLi.g Dr Conaaat Documents,with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner,for. . the faithfiil performance of such Contract and far the prompt payment oftabor andmatedal furnished in-the prosecution thereof:or • (2)pays to the Owner the difference,not to exceed the amount of this Bond,between the amount specifrtied In said bid and•such• ! lcrger,:.raunt tbrwh!ch the Owrer clay in good faitt contract with another party to perform the work covered.by said bid,then this obligation shall be null and void,otherise to remain in full force and effect.The Surety hereby waives any notice of an agreement • between the Owner and Contractor to extend the time In which the Owner may accept the bid.Waiver of noliceby the Surety shalt . • not apply to any extension exceeding sixty(60)days in the aggregate beyondthe time for acceptance of bids specified in the•bid eioct;r:,s,1!s,end the Owner and Contractor shall obtain the Surety's consent for an extension beyond sixty(60)days. If this fond Is issued In connection with a subcontractor's bid to a Contractor,the term Contractor in this Bond shall be deemed to • he•Suer antractorand the term Owner shall be deemed to be Contractor. Wnen this Bond has been furnished to conipiy with a.statutory or other legal requirement in the location of the Project,any prevision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions • crr,fc;r,iirs;oto:meet statutory or other lege(niqureint3ntshall bedeemed incorporated herein. When so furnished,the intentisthat this_dond shall be construed as a statutory bond and not as a common law bond. • Eigned fed'setts J this;12)P,day of• ,r�CYpyer_-„_,� 201 k ..._ • tivo,,9'i.`Airest: • . . Florida Construction&Engineering, Inc. • ,,.— (P.rIncipel),:.. .,. Frankenmuth ututal Insurance Compan . f,,n - �a I (5uret� `t Warren M Alter, Attorney-In-Fact ,-.. This document conforms orms ca ALA Document A310 - 2010 BID BOND. THE AMERICAN INSTITUTE OF A:2CHITECTS, 1735 NY AVE NW, WASHINGTON, DC 20006. • • � . • .. �m� mb1 f ; e ., ,• ` _..� ."- ',96ofru q.Jt 1. t [�'%, iraT}��4-,-`_.1�JJ/r,.::::,%:(:;!: :.,',......'!,' i l ..•I;.,(•-..'.4..':7Q0.YI. 'til 7i�as * O.LQ:3LdSXLQ3gQ713o15•i'1rl,.fi�'73Yh'O!.ki.P.: idi.i,kd 15. Q'A�II,Hit7.til.TF ;i'�/'"1•,'-••••;1`'S4?•"L{'-' '!:5'"'':••r• .3ScNn df: •r_ S. • } f tz` .luaptsaid oin'!'0$pnu}I H ►a1{fuy . t . r •• •• • r ,'•:'..„.,..gc:..,..:.....:,.,..,.::. , ......,...„,vT.,.. .::..,-.(•.::.-...• ...-.:. - ..,..:: -,,;-•• - • -.�z_ ',o430:,49'.7i.-hE i?dr`uo:,a . .:O .Ea 2x1. ... :8i0Z ., .P t��Ysrtp �. �3 l.:S a�P ..d3u�pue puEq A E,I J' ;r�'�i:J'�sT.����1:� ';u1,�1.[M N7 . Lu 1�S':1A . r S's ' ., ... ' ':..'.. .,.:. ' ait'p S1 LI1 4C SL l:,a tit a0.;0.. n :Ln$I . r' : ', : �� P I I1 3 P�pu6$„ .2o pa�lona,I uaaq 2O •stq�Caur0W%T O 1aa►oa•ptES 1ts• ur in..ilol4V•30 l•��od 1Eui2ua.aig LI X.,0 l id�iv,Nu> l�auo� . `ani I2ilato`;aio.ag'j lEiil13iu2o icgo.i op ,C..: •, D•.• • Suj'1pnan•`.Zpn• .-•.:EJ.I�o•luapr'. :, ao►A•.`�au;lsaapun at:1 iI S• . : JrF..i-k f t ,•. • • • :t S T T; 1" C. S f (I 'ULL. l �1' i .t, �. �, ss � 811, f.Z 1 � W t: a • llc�ilJ yv r0 iE?5 -...,..7'\ ntitfl'Es r • -llgif�. r'N 'A I rl lif.iG ...-[.....4.,,..i.;....... i L H G IIi4aS,� < /"`i✓e"•i1Y+R� e_ -z.., ,y ,. •9I•OZ '!1'30 XQp q1g;sTgl 1EaS iEraL3p Au pa\i ..puc• piitiy AW tas aA2 i ..*:"-*-:14.....:::;••:':.:,•';•::.';E,-,.:',...:'.:..„:-. •; •.,' • q l aU'�2t�M-�h.�Fl>l,LS3.L i�il jy: ` ' L'+SA , r.t •AltEdi 0')2'TT1 JO {{Ltni1jilD3:'a3 C^ '. :.,i1UI PIES 0;P `I .p.:�IIS Ue . c paxr}�tata : a pse n ir.2iss>•gpiie-19•1" iotro3aipples;ptie•pasodap w.., ..-iib.0..,ma.rdarli�patn:iaxaot1°l4,• t+r•ui;iq.Irap{aa o'" Pue4 npinip n'aq;v�q o;IIMMou� ti ilii lad aiu of"iJ'• �iicttupd a/•• •:3 nq`im1i O11\r J:..- :.• 1i`ui'aiiic. i;,1e N e'• u S 4ip :o,- 41), ,: i1. Ir;tt s70 V LS ,.w • f 4104:::-,:.:..61311144d4uti5 pue luaprsasa -• -.`V ...,.. ••. -: '4J `P utatiipg -2uapai J.. int t + • • r ;! , ..• ,4:r4g uo ,aue is►suj i n.13.1 ?pn. 1„.P 11 t. �` + .. z .�s a . .:'9102%CE AUO fii>p• tJl8l itJl pa\ JE clunaaaq II 'S 11.t. t�1o9' sJJ,put siadi o,aieudoiddE slrcq pa;sazz put paunis aq of sivacaid•asagl'pasrle:-.).. 1.1•14., A.ritdt:rc;.)•au;`,If.? 21 Irkl,SS?AI:UM i 1I: 0. r':-, Via. ltloti]05.aTP"XTTJ3 of ut.d S/CiainS O S�!.ui.`.'.,•a.uti. :11t �Teupn0:;!fipno� is uo UEJLI ^::.,: •`.ns T :: ;: r P TA 3.. : ...,�,P �' .. . trmi�itta�IUE1 •�:opaap put:lot at13 st aypaln�otnl3E put; o Jletlag Lu ii�axa ci.`!C:rtiwollt: 0 �iribd L1i? ALJ1 w p'uEu (S)Aouio})Eate}vuic litnb`,CuedaIoDEi{;,;,o 1tJJo Fitt:fCqu`�J;2�,swu3lJe: l0')�1C.Y.:l: :a,1.Elr:i4 i.��1 • n 1'A(., :j.�L;IS0E3 j0 asLzCq'pa.Jnoaxa aq ito Xjuoignr:.tpns put ;Coti�oppr;ao• s.ian�od.::Hox:.o; pazu9i. n3.,st• ng :it% Suouuu rsap �itttoarlsat nate spun; atf Jd-(J3•t• pui auaprsaad ao•IA to.luapsaad zoi.[1 loruaS:luapisaxd.,ayl.E41 t7. ��14`v I� ' n • . 3osloal .. o • aqt o1 lupArUisLldrWdLp2)1d.:utiss',uClaa1tionlnT JOganwhuod usrti:;.t;3j;.,.,tt ldopt ipip io;njosad Aur„ti1JoJ• ;' loalrQ a,ps.og apJo c.uau , p " .. : x 0`0 0`Ob .... toc 0 S)saE:IoQ'.. O'Put uogR111 X o Ar -Ia mas 0tp'paaoxa loii:IlE•tlsluaIuru.*I I ssons•auo,ut Jo Mals I u J o411....4 .iJAa;4'OAJ Ip...p n01C�aaat.[nsuj •" •• Xl•ue.mnD 1tlueut 0 u07id oxo atil..L11t `dhLISiC1amv Jo.snUl?IEUa15LTi pUP e3ara}uoo`spuoq jJ•e put;fit ian gap pue aDpain�o at; . :. `iYas ting.:tx ` te o `2riogv ptultu-St auo irtq a1owjt Ciwtdtc altJEdas Tulp ul ...:..:']Jt-u1=(Sl(,iL oa t.1r1i „ pilt�at1Sl.tlat1l t a • f ' z}Idshy.UM. t2Uge} IAE 'qO A8S)I1 � 5 1 P Q 4• 8 d uey�e �f:1a�ld W ua»e• M 11 • • .• luroddr put a1nilistto5.`'• -: toU,CgJ iJ itop`L8L817 uEo 0tY1t `tllntua�Inti `anuar•`y'.: ;,,' 1:4:?.. .-''''''''..... IE .3-In- o Edtou•ud sJr Duret ur.�i or� . 0 t: 4S:a i .••-•:.•• it: .. '1a un�UUSi ca us tzi ti;A]o ''3 1 u Inld' 4 3f u P P P�• . InP U012Etod3o�'z`(//uiitduro3„'atll) lfuEdmo3 aouelnsul:Ien1nyQ tj;niuva.,:, �Wgl'S. Q'IS32JJ a• 5 1-il,[ :le'r i IT;ia10N}I f • J�3Nt1O.L LV dO):I: k�Od : . . . Y. Xu�aro� � rrs�r �ni�I� .ir1i : . 7 �. fi. r 1 • i . /A Document A310 — 2010 Bid Bond • • CONTRACTOR: SURETY: . Florida Construction & Engineering, Inc. Frankenmuth Mututal insurance Company 155 Bantley Drive 1 Mututal Avenue • . • • Miair.i Springs, FL 3:.7:1 SO • • Frankenmuth, MI 48787 . . • ' \OWNER: , its;Of Miami Beach • • • 1755 Meridian Avenue • • Miami Beach, FL 33139 EOUG AMOUNT: Five Percent Of Amount Bid (5% Of Amount Bid) • • • P O..!E,CT:Waterpri,ofir r -Traffic Coating Services for Parking Garage Decks 16th Street Parking Garage Invitation To Bid No.:2018-232-ZD Tho Contractor and Surety are bound to the Owner in the amount set forth above,for the payment of which the Contractor and • Surety bind themselves,their heirs,executors,administrators,successors and assigns,jointly and severally,as provided herein. the conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified.in the bid documents,or within such time period as may be agreed to by the Owner and Contractor,and the Contractor either(1}enters into a cantrur..1 with the Owner in accordance with the terms of such bid,and gives such bond or bonds as maybe specifced lathe b.d::ing cr Cortrziut Dccuments,with a surety admitted in the jurisoictlon of the Project and otherwise acceptable to the Owner,for • . the faithful periomraance of such Contract and far the prompt payment of tabor and material famished In the prosecution thereof:or . (2)pays to the Owner the difference,not to exceed the amount of this Bond,between the amount sperafifledin.said bid and such • le:ger a nourrt tor which the Owner may In flcod faith contract with another party to perform the work covered by said bid,then this • obligation shalt be null and void,otherise to remain In full force and effect;The Surety hereby waives any notice of on agreement • between the Owner and Contractor to extend the time In which the Owner may accept the bid.Waiver of notice by theSurety shall • not apply to any extension exceeding sixty(60)days in the aggregate beyond the time for acceptance of bids specified in the bid dont rents,and the Owner and Contractor shall obtain the Surety's consent for an extension beyond sixty(60)days.• • • If this gond Is issued in connection with a subcontractor's bid boa Contractor,the term Contractor in this Bond shall be deemed to -• ba Suocantraciorana the term turner shall be deemed to be Contractor. - • When anis Bond has been furnished to comply with a statutory or other legal requirement in the tocattan of the Project,any parols oa:in this Bond Conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions collo:r:,ing to .e:ob tee Mc -or other legal,Equreirnent stall be deemed incorporated herein,When so furnished;the intent's that this Bond shall he censinaed F-3s a statutory bond end not as a common'law bond. • . Signer;:end sealed this Liz,b..„clay of, ri ctahe_r_.�._-, 2018 4!r;"^1,;'t!,:t+st: Florida Construction&Engineering, Inc. . • • � _ _ _ __ (P.ri:ideal) . • Frankenmuth tutaf Insurance Company 1 i `r • (5uretg) I i _-, . Warren M.Alter,Attorney-In-Fact �- This cacumen conforms to AZA Doctuneu.t A310 — 2010 BID_BOND. THE AVIERI CAN INSTITUTE" , OF ARCHITEC` S, 1735 NY AVE NW, WASHINGTON, DC 20006. • • • . . ... • •.. ...,...„.•,..,..,,.!,.•;•;...:,,,..-'1,9• ;;I:.'.. ,•./.i,:••:;':.,••••:,.;•••-.... f',...':. .. • - ••. .....i...,.......t...,..,...77••••'.'••••*;-**:....i•••••••••••:••••,.;„:,7;;;.,'-k,.. .:•-•;;.•..•:ft'-z.:::1•••••:::::',5'.1!•":•,.,...•:.' ...'•••••••;,•.••,... •...:."..••••,•.1.,....,::::•..f... ...•• :•••••..• ..„..J.....-.:."',..,:•;.•••„•••'' .::.:•••'...:..•••:..,:,,•••••••:•.. ••••••• ••••••••,•,.....f.e.,::.,,...'••:'•ii..'...1',-,.....i,..,-. .'.-. •,:,..t,";,.:.....,s.'....i!.',,::••• ..i...,',..."..!:., .:•.!,..' ' .. .• • • . • ' '.• • .‘.,' ••••••• ..'.,•!...• .....".2-.'. 7.,..1i,.., ..4;-:''',....'•:••• Z....,.,....i.;.:.kit..,:7.7i....i.,,;',.,.,'..,,;•••',.....v.i..t:,..'".... ....„......f.--;:....., . . .. .• ....•...... .•- ...-:.:...-...:.-,i4:„..f•,-.....,..,..:„...:,:iai:•;.1t..,::`, ,•-:.,..1.4•:.h.:!*-t. ..".:,.•;;•:-...,,..... •,,•••:,-;„:.:-.,iw-.,.....i :;,.,,:';'•••::.C...!,1.r• .. •• ... t • • • ..• .,• -:•••,,, •.. • :,...',.. ,,,7.,.- ••••:'•••:'.•:•':..., •••;."i.--•.• •L',•.:.!..;,.4•.'.A.'.,.......'-.:-.•••••:?0,?....',7":••:::•?:.'...$•••C4::•'''••*.••••,-.:''.'••• • •••...;.; • • . . . • .•.,•• • ..,.• • • . . ' ..s• ••••••••'.',.'-ir:Y.'.:•?..,. . . • • • •' • • ' 1 '''''...: •• •••:"•'?•'••••••f••••••••••••••! :••••::•...'-:.:.:'•.•;.:••.••:::.'•.,•i•••.-.g;••'.;.7'.:".•";.•'•'•''.T..i!f:•f,.'.,"-.‘.7t.. .,..-•:;•••••'..'••••• - ..,.,"'.'.• • .•• •.F••.RA--N.•• a 1•••'V••'-::U.TI•I• MUTUAL.•'INSURANCE'•'.:•...........,•.e•..••••.••.;..C:•,.,.••4"','..i,.O'....'.••:.•-'.1:.(.'..,..:,;...?:•,:•...,.4'•-:•••:•!..:..••..0•,,.•.t.--.47,.•i...„i.,4.....•-.::'.•..;.•,th":.,'....;,.,.,P'•7..;„.,,:,I't,r.•,.-:,::,:'f.•::::;•:.•...:...:...t.!",,'...,:.".-':.,d:,.3:';1-,-4•-•4••.•:.;•:•.,:;:.-.••.'..•.••..,,...5.,.!;,%,.1,...1.,..,:•..:.,..'..k.,,..'..,.,;”7•i,:!•;7-.....!•..4:,7•.7,•.'..•.......,:-:••.••7.,,1.;...,;•,•,:,4-,.•'.;.:.•...•,.:--;.-.•:..•:.•."{..::.:':.•••,....••.:••'••...-••.••....4:;‘:,•;.••:....•t.„•,,!.,,...•.,.;...:::.....:...,•.•...",,,.::..i,•'-;.-.,.',r':...','..7..•.;•.....•.•:•.::..,..•.:.••„.'.•-•.•..•..••..•..:...• .,...,. ... . : • ' ' . .• ..:.;,.• ••••' '•'-`....i':••••..*-......•• •'....;..g.- •:::4'.,..' .•••• •-: iV:.';iiorn'1"."oration••• • ,.' .. . ...-.'... : • • ... ..... '... '• ..'>.....7'.:: •..,•r:ii „,.,'•'...',.(ii.:.ATORNE...,..:...... :-.......:„....,,‘,.,..,..„..'...,.....:..,-.•.:..,ih.6....et„.4zijt(giAriXx,..?:1';',?.-•:;1,7-•" •-':..iiitt•:-.... .,:•':: ., • .:-: ; . . . ... .... ..„,...... ••' '......-1•-•••'.-:.-............';',',.... ....'•:•:..::. .... • ...,.,,.......:... • • ;'''•• '''.. - . ..- .PuT" .......A:,:!..b..:...."•!'", :. 1,.....1.,'.....raike:.Company.......;...,...';•;•4i:•;;.,kitii.u4 fr!... ...PT4!•-...:!......!.:'.•!...Q.:•.'•••••-'.. .,.„., •..-...,....„,,i,.. .........:•.-:•••,,•••,.......:;. .......:....,i. ,,.. .:• ,., . •' .. • ' " , .. E7'•':• 4e iiiiiih.M4u441.1....,......:-..,nit.fice4t.i"--MP..7 .:.,. ......?;,.., i,•••:.,...,....,,,..::;,(.....-.:•,..,..„.:-.-:: •-...„...':,,......:•..'.•, at.t ra-A--n• ..•.•---- its principal ,::-.A.'s.''';'-:•'....•'.-.."..••..:....„.:.....".ii.,••„..:;-:-.1,..:. :.,....,..,...,,,„.:•-.q.,.:•••::....:-...:,. ..',....;. ..,..!.....:"..,%: . ....1-..i....'. ..:••--.•;::Y•ll•--.:....7'..:... ..•••••.. . .....?...'. v--i-IP:',.8E i;RESTITS'9....i.„•EMICiligail,having .• -::' '...:•.•.'..':1:;::•:'a;:;,',.::.-7--..:••••-'.'•;':::::.:U.P.1.1;•::: ....i;.....;i1::•::.S".....•:: •:.,-1::•-';'...:..::r.i '..•••.' ......;;;':...:::1.. .....-2:'.•::,:f.::.,i'...::::::g....;::::•••.':;:;fk';•i3vALL,fdg-.N.B.'. 1-'..:''under lat,ifs.9.gthe•9'2'7-appoint :; •'•''. :..,.:....;1„....'..,..,.•'......r.....,.. ••••..g•.?,:;;....:.:.:4::.,..,;:i.,4•••.;,..i.,-;......;.:,',67a,itii.:::‘,.: :',.'... ii.4•...:.•;;:.,.;• ;:.:...'...1.:PIE...'''.;1.''..•••,;..J'..'1.::•- •:.,...,'••,..,..... ..-. ...F.N,-,....7 --d existiogund .. constitutey and ... ........ .:•• '...:. ....:;: :.-:'':;....;....aiiii:.(5i.ganized an .... fler,:...,n6raill..... ate.'.. ...-.,..•....,.. ' ''..:...;.,:.,.. .•L..,..,..",..,.,...,.id,...t...i..8a000;):.Rvir1:,..:i,:4.,;, „,,.;;I,:.,:tf:::;.7,;,..,....,:-4,,,.,,...„,..,...,;,:.;.-,5. 1;,,,,,, ,...,... .:..........._,...„....... ...-....;•:.•:::.:;.::.':::..:;..-::*„.......miafg.an 48.7 87?tloe'-. -,''........A.:8urs0*ic,T•-Y! ,.. ..:.M. :: :..'..._,.....•-g•••:'..•:::i.::',. Z'.:4ii'...'"''..:ali:0;10094!P !. .....:.,:•.i.',.. ..-..)..,..f......:.:,..-:.. •.. • '•••••••;, ".....'::.''•,..a..-:..'-- ••• •••••', • -.. ft I Alter,' :JonPfl' Il ' -....-..••• :••••••• - • .• ',-. • ••• "'• 6.i namectAMY ?;., .•- ...,, - Tal..Guar;p-.)',.„...,,:.....,-...:..,....•.;., al, .' ...../..;••••-:•:-1 ...12.•k"'J'-',i ''':i.r:;!;•zi...,:- :: ••.•:•'"•.'.' Iftrren -•,....•• ...• . ,:::-.: . ,;,-:".::...... •'...:...• ••• •. ':.•.„'-'; ,47ittote..tha9r1-..-. .,_.,- ,,. tiroji..•tlf..TTAy„,:y..,.'i.,...-.q.:',. .:...;-:...4.,•,.. ..r.„-1...:.,....:,..:...:. ..,.;:i, .:,..7.?.••••,•:..-......;&.2....4:',...:.'...'„'.i.V;;i:-,...• .. .:-:.....,,......:.;;'.''' .. ...7.• ••• •. •••,...' . .. ..••' ..n ' separate 9ap4?'''-' ..L..„.urtysiiitic.:vilta.4.1s..' '..:.•.,•' ,..;fi..k . 114..,:.:,, : ::.!,,,....!f.:-..n..,.....;-•;•'...:,,i,..,.::: •, e •::,''..•;:•'•''..'7•;:.•.;?.••:•••'.•::•!;•:;;?;..5.;.•i":.•.•..,%: ••••/:........"::::.••7. .. '•,(s)-in-fact,each. .in.theli:.. uspj true s 'orty /t.',tiati t•talei n°4. .... ....,,. ,,.n6i 6,-c .od',tli-,:.. ...!1.-,:•..7';,, f,,...,;,'i!•4.1,.;r::.?.;.ii.:,.12...:• ,••••••2.,••••:..,::.,..::..,::•,;..-.-.......1.,:.•,-..3,,...,...,•:.......,•:. .,,i, ' . ict lawnki.4tt°vT'°). ... all bond con.t114ct. ••,....,-;...,oh-..:iyiattiostAt.9..d".'-, .........;.:,.-'4••;,•••;:•i• ••,.;•.1. ....-.%.".... ;:•u•,--.••: `i.i......1....,:::::. ....,:-.,'".....1......::•: •••,...1.......,......q,.:.:-'....-7:-. •• ddefiver any and . ,. .....,) .. of...4nY 9rle!'-. ,,......,...k,...;..,.:i.:;..,...:i.....,...:.....;-.- ...;...?;:.....::...!........:•,.i:::::e....3.::,i.i.::;1.,'•...i...,,,I.-, .1.:::4-7!Tf-,•':."'.:-n.',,'....-.......:•• .' .-''' •••••......••••••!'-'..f.•acknowledge ar.1;,j.,:•.(1•ho v.!eVer.that che 11( sum- :.,.......•..7f. • •...: ,..:i...'... . .*:'Liis.:•,0210;009,99c!)5 ..;!.';'•'...::.1(;•....,!.......f.!,.::.;:•'...T,. ',Z5'. . :::r'.'••,.:•:...,•;4i4§.:,,..,...„,.:..-..;;.........„,..,i,....,....::,.-.:. !"...........:.'...,:-::::;: •:.::14iiiiii6e. 'rPl'.'" ..::'-'-..-..........": ......''''..:' ...i:'. .... . •[tin.itiid'09.4°;€!:R°'''..'::-.. .:: ...'.-.--:-.. ::- .-.;.. t,..:iff. 11,44#YRCP.. .i..7.7. ,-.. ..,...,:i....:;,- .1:':.::.....-1,..,..,:,`7,,.. ...;.-.... o e ted at a meeting.:,,.F.-,:-.1-..? -,.. :•....a.z,,./-* ,-,*1,....:.:. ...;.;:el,-.:•.::• ..,...e: :•.:':••.'':':'!.'.........,?..‘,C:r.;:::: ..•.i:'.1. ..• . : • •,•..'. .. ....,. ..: .":.. '. • ..• :-.......' - '..: . ' •R..--.0. 6.iutibii OYIY:adoptedL.;,.4:.•:•••: if',?,:ii.,..;: ''•'...-.......'.':'-...2 ,j.:ii.: W..,•: 1!..:,:;t. i•i:'•'.:',.. '1,! ;.?:J• :...i...;?..• rstirti.fr,..thp tblIer,v1P.3. ....,........ -....-,........, ......„.,-'.....;;:.:..-:•....q....:.. ........ ........::;.....'.!:,....--.,';:uFice...P., . :.„i-.i,,,Alli.1;.'.:,.,,;.'.......s....t,',...i..:-....: . •• :,::''!••••",S••,.....;.•.''..:.':.•:;....:. • • :.• : - .... . • d. mi .•,- 7. - .. :-- .....,•-:•........•:.. '.i ......,'...;',',',.",.:::,2.-r.....:•'''..::':.....:''J''',..Y.:_,-.r...'?.g,.A.Trae.u-w4'5,::Z5":.t'l,...:::.:.%.1.'....'4•:,-.Ii.••-•. ••' al ...,.......:....,...y.',..'.:...:......•..,...,...F.::::::.•....• .• .f..Atioiti),is a-ran t., - ,/,....; • .....,....,,...: .......,;.., ...,......,,...: ......."....i,.. :.:..;:. '...?..•••:....'. ..•:`.... .,;i:ihetti.:".#gFE.jt:7-r7f...-... ,i•.,-.74.,Sri,:w.,},.; ,.'.•f::'•.;•:.''..'.:7.:.:............,::•••••• .';..: •.:......i......,"...•••:':;.....:...!:.•;:ith'•15::•E:.iPiimw'uriti°1g- 1-16 .Iil5....11r:•atiC_:"...C.:3::11.IP.7,:',:';.•.:':::'.....:..;....i,.:r, t,,..: scie....:.);r....q).:. ...ia;:.......f. :4andd.:6Piit7r4h.,....iici4;a•ptli. ..:ty 44..,u'I;Jjt.2tiiitd. eq1441:1‘::9ey...-•`..14:".".i#:i;;;;•.:i...::::.:.;.!;;;;;....:;.1;!::',.....:..:;:.:;.:.....i::;:.•::;;.,,..1. :::.."...:':•':".:::::::';'*:....':':?.......:::.-1;z:.:,.14-G.,.41...... ..,.`cilE i_3:1that tIte.V.ip..idF44...8i.ce.r1..i!1,,,..xcle4t6..pos,t.;er*.:Pf..a-0..rn.a.i.ie:!.,,,if...fki.o.•/•0.1.1 •9?,.7thir17I;...claidEfog....,or...§m..to.).!:.7it:.!"..T;;;:s.....,. .,...:,,,,..„,,,::::,......;...,..f.....„.„...,:.....:...: y t e •::.':;-';''.".. 7. °t•ii8fi '.....'ii( eb is 61"°ri...cccia- esz.ed ot:Ac14?bV.4e.tlf.:latd.,A.140)itti,..:f.k..zii.gid:::i40,-*.t.11.-., . .?::Ftqt4,: ::;,;;......i7:::::,::',...).......,.;,....;:.}:.... .,......,::. ......:,...:,,....2.„..;.....:.;::....:::,,„.:::-.0...0.e„sk.7.,, te cor sicinaillz‘:',.NY4ill 1441tiY0.:.-i,..e../;6.cke64 .'°n.:b 'iundertakings.... -..9.fi,P.r:PP...."-.,.3.,,,,!....,1:1:: -A. .:•,' -,1!,':,IFY.,..1... .,:.:..7.,.,.;.;-.,..4...o..:•:,:...,!..,...:-..„...-,:............,.".:, .: :.:—......... ..i..,...:.......:::.,:....,,........„:..,;.,...... ....f4c..,..,41. ..tht.',.. 14,pp..ty.pr.c?f4..:.;• ,./ _,.. ids.:cJoat.nit;',..- 1. .....,....";.,':!.--..',...,'••••i`i°.'7.....;:::.;'• ... ., ...•'''' ....;;.•'..':;•'..'1:'...!•' ..•';,'-.!.•..'E,1'..,;".;;;.:/-='•__,L'•••'''e-:df68441.1.44,-..:*.:.Y .:-.'..‘=...17:•"':-...-::• nail1Pd''''...•".•P i- '.limy•on,•"4, .19` • .;:.•.;...:.: ..,,.••:• ..:.'.. •••••&;,,•••••••....:,.......,',:::.•: ;;.•,....'...'•';:.'.,•••' : ".•.iti-•anOrQP145,-!.....-:-.....:• .,..,•;:.:...."..,......,..:,..,,.:......:•.,.,......,.......,.. .... . -: •-...,....-1.' .....,`,-,•......•-,- .. n co.:s,P19,...........i: ' .... - ... •• ...i... ..••• ;.• ::'-"i'"..•.::•''','''... .....,..t d attested-b5'..." ••••:•• ',.,.. .....T:.:'.,:t-.'........;.••••••":': ::;-...'...;:•,),-.••••?-.'f!.;:;• •••'...-:'Z',!?..r.:')-,1•:.... . .;...::•'•••••?,t'::'.. T''','....,.....041441.r'..'„.:....:.. ..:.. ":/...7".';[;'..• '.."': '... •••• ':.L..".. .. . I.l ...•''• to be signed ,.:',..-.:...-.. .,..-,..'.1....:;.:',....:... .--:=...v,.....q.,:i.6. ...4.,,-;'2,ili....;:-4,...,..i,,,,-...,.,... .::, ..:...,;..'....:.?..,....; .:•• .'.‘-.:•;',i.:..,.:,..!fk!,,,-.-....,.•:..i.::,-,,...iiii,6to:!' .• :: .-.......'2...::'.. -,.:'.• :...•••••,..,..,:„:,,...„.. --id the4 :p=p71-• ,:..,-.....,..,..i:.;.........,.....::...,.:....i.:::.......i...„......„,..i.:„... :.......'...:„i..i-t.--y.i.!.-:4-.....j..:T.,-.1;;...,-,i,:i',.-*te..1.14.4:;.?:-.;;,,, k-&•:;6...:.;...- ..i:;...;:::...i..!:::-..:-... ,...,..,....;:,:',.....„,t.!g.i.,:.:!.:.-::,...:i.:4... i.',...,.............. • ...... .....iik•E10•4':;.'flie CoroPaP ,..'i 'f./13,,.,i6.10.....::.;..,................. ...:,,.,., .:..:....:,:::q:5.::,....;......0 .......,......i...ilitili54yi ....t.-opitg...11,1411:....47.-..c.0,.,......A.-...,:::: -.3....!i!. ..,.:-.,....::. 414:'...A:1:17.-E'l-SS..•C'Y ' affixed.this.1,8 al.ci. y..0 ......: • '......: •.:•;..,.1..„,. .....:.:•,:,,iiiikeri.ki40•;..1')it ;14..-•.:,...i.:i.. ..,;-:.;',:17...i-'..•.'-=.t.,.*:,.:,.3:...,-,,;P'''.-,1.:::::,,ii.;fi,-..,............••••,.!,..!:;:,..............::.'....,:.........• ....... :•.:........4.........::;:.t•:::,..2.:-... ,:.4;±:tiii.4t.e.". !..,11..hereunto.. . .... .. ...:,.....-....;: ..--..: .:''.''' ';;•• ' ...•i•.•:.'..:.7)-;• ••• •... :...":sy..1...,:: :•...,...,... .....',.'"'...::;.:-.......,......„,".,' •4.,..,„•: !:.-::•eiOr.;•:::•••••P'......:...1.":• 7:-.-.:.-,'•:...........V: ;;;;.:•,.. ...,.:,,.,....:2,...;...,........... . . .: ..: :.......f:„-. . .., : • ....•.. ... • ::„ .!..:..... ..... ••. •:....•.. :..• .. '......-...--.---....,.,.... .: : : •...•••-k-f-.,...1..... ,-.•:-.-.- •'...;,•.;•',..4.::.;,..;4,.......iiir.::,,I;.••:•:•;!,;f:i....,••iy:;'::::.7:..1.:::::.?'.:.•:,... :..ihk.:%•;:14•''...4:::li.r......,:_i.E-i;!..„i.....:1-. - - . '..,..I.,:::. •,.. •1::. ....:..,:-..' .. .-.'•l'':'.......•. ' '••:.. .. " . .•. ' ;..:f):'77...-"7..".... .i ..A ...,..,....iid.i.;i:Kgi*:r314•.6:41.;.*T-.;' ...:7;.11...;'-...,•;::::•.•i',..r...i ..II.'...s.;•'...,•f.: ...;.::::::':11::::;;'''Ii-'c'';:::.frl'''..1[4.-ii4i.';'!••••:;.: ''.: • ...i.:.::•::::(S--;•e.:c•;1'.-.):).7'.;.-• : • ' . .:. ... .. .:......:::::....:::''....):,.......1.:'..;;;.:,. .F.46i._10.....anctA71: 0;.! fi,*ki:P05113'6 .;;:•;: ..:......7::i.'t,: si ....j::.'..!......'4: :;•. f,••;.'•-:;•...'''..'..''....i.::::•:'f''.:.... 1:"..f....,::;•:..'....,.'.. .....;... •..7'.......:::....?:: .:...„:•.• .-.......::.... ..• .-.:::-... ...... .....::'....'..:1•:•.:•,...;:.•:.•:.:.':...:.....1•.::','..14.t01d0".....i..,;.F..-:•:.::-.'•••,:::......;,. .:....24.. .;.;..-P-1... hili....;.i;;;;....,,......;:...;.• :',.,.."q:",•::....,.f..•:-.r.::;:.:',.,..;;;,:-.:'7 ......i...,.,......:,._,......,..,....0......,...,.....:•.. .,.,.............: .._,..)...,.,......-....:...,..... .:.!....-.........,:i.'i ...... -.........' . .;,..,..;... .. .:'.',..;,,..:.,;-:-...;•....;;....... . ,.....:....=: •••;•....;..'.•:.;..'......1:•.;.; .... - '.;;',.."-.'s.•.''...';..:''•:,-..',..;...;.'7.:::.:f....';:f•-ik?".:•'...:i:..k ..; : .5....-....:,• •:.':•;.....'•:•.,l'::'•:1 •''...:1 .......:..',.'„'.1i..-.:5.f.,1"/,';1.:.;..A..:::::....:...;.,..., •,..: .•.... ....,1,:•••• • :,.... ..*.- ;;.: •': ,....„..... ... . ••• . ••••••,,-•..•...:• '.L;'.".1.''...,-..• ...:.,..-'......'.....:::: S.:."•,.....,i'..n..-.',.:7.:-..Q".•'....:;.:',.;•]..,:...".'-... ...4.'.. ".'9,t.4i.4'.'•••;',...'.....il':.....k:!.'':':1,;•.. '.,."-'5..',.:.:....:;.:,..4r.,--....:i7'...;!;,....,:......-..,/...,;K-•;• . ...;:...1-.-::''. , '. . , . - . •• ' • . ,. ...' ...;'•...•:.. • .•.:."•...,:.,.:-",-7... .,•••::',"•,......;,•.'il41.k-kignY11...,tia. -12,2iiikiiif.g2e4gt:),... ,...... '... ::: . ' ... 'r'...d..''''.1';''..- 1 • .. •''... . .. ''' .•' • ..• .•-.'.-': . .d litTC4:A00f.n.lk § isgiiiiiitS4. PR;Ii..s7-i.-...'•1..z•;-:;,•,:i',i'•,.'...;::::...i..'4Uif;qini;1;;;.-•,.. .;:••••:-.;.'''..1•.i..:-...;1:•:::.'.4-:;•fkitt67.fv!1-,',i,r-_.,;;; .;,A7 ).-5F,:. • .• .... * - , ,..,,•.0: , .64,.,1,:rg0riPk;ff.•:•' ..frEk•.:.d6iii,ei,..,44:, .5.1..... ...,..t.!:4,:.i:::')..(17.:::,.y,,.i:..::;:.;;,..4-xi,i*4,:wK-..::::-../.i*;:.,,,1:,.::::,..,...,,,,:.,:...: ..! IN ....!...-..:-..-...:....Y.:... ...:::!......0.-x4.-8ftv"1 "'".7-... : • ,public irYen ... S e id sai S and state-t41)-:,[.-!'_1 :e...7.:3.t,...ai.)4.!:ed, sla.. ..'.':;•••••••!...i.;!:;..'.....',.f..';i'•:. .il:•.;...':;i....;-?....j,t:1".•;•.::.r.•:.-:::....;..t.--..m;";".t1.:y. .;?;E:f.:1:7..... .1;;;; ...!.;::1..:.:;••::::•..V....... .•.,....;.:.,-•(::.....i.1:... .... --0.';'....iit...(3,,betbt.6.111,ii°vt. ,,;.ei.i.i.:1:4•.ow 01F.c..4,iIL.;..g. Lc.:114..aili:;/.:'.:J'•;•..,...:.:...,::::;:.:...•;:...:::i.:.,T.',.;.......1.: •-:•,.7..'.?.....:.. ....,.. .... av.;:•••••,•••6k.;,;:'ii-',:2;.i...7:;:iiF.;.r.....,..:1.7:F.114.14:::,:f.,..::ii7,t.„. .:4?.,..;'';:4. 54,!'4 ..., ,„-;•:•;•-•,•:;•,...,. •; :4•1:,4•Ttittlii',0q 'ra)iii.4n,11(i•;i1tiLIM(;1'1 •'°3f..•'11 !‘411:1r!it•2'••'••'••''•:'''::'••J±:'••''••• •.•••..;.0•••flidiali§ i illis•l.;•?•,1iCIT!.7,...;••;'•••,:*3'..1::::: ::,-;•.:,:,. ..t:t•;:::It!?3••-•141.till.:• . ••,.r....1...7't11. :••.,......:; i•• •-:•'• ••••-•.;;•.....:••3•;'1'.'''''•••;,..74•;fin"-.4A6sc.•-ic.ki'.-.,...! '..- ....:-.-.'..-......-......-... dad atYixed f11Y. ....._,....,...,,.::•••'-'...,.•-,••. •••:,-:''',......,;•••.'y..,..i.:::;Y:.t?„':::'.1:c1•;•.'•.,;.PAn•:;:;':`4';.10,..t:71k .',.:1.`';'::.'.....f... ..--.7:liti,...,:-....'.''....".i.••,,K4.;',.;:.;;..: ::--',;•,........:.,'":;:i.,..:-;••,,'•,:••: . •:- . •.. . ''''..' •,N. 1-,4'1 have set my hand'' ••• '• •• '• ,.•' ..74.••'.,••:.•,;,•••••;1•;•!.."7'•-•••••••,'••••••••••••••.;•,.•,.. .i.:i•••7,1:•;;,:•',.." .••:::%:':.13••,,,•;••, .:1:-„,N,. ..,..s1.•;•,;.,•:,.:1,,,,:;,,•••;.•1..7,..-;":.itsii.,5,7•-!..,......';'....,...,f F.....", ••."'•••:••• •••1•••••••:'•.::':::•••••••••••••,'.:'•:.',....::::T..'• •. 'y.WHEn‘ff.u : •-....7' • . : ''.' ...•......•;•'•i.,. .. ..•::-.... !'.'' .:i.:.'• :''.••.'.'.:.•••..:••:::•-::: :....:-_":': ....1 •,';•,,I, !....;..1ii•;;',1;15:.''..:;',7,4.::-...A,.‘....;1 =71...:•:-'4"......:-;':`;4'. ...,•;•.:',:•it.....-A-'...'....' :•;,•..:; '..".".••Y..:::: :'••••'17.ES.t.NPN ' : '• •-:-. ' ig. ,.,e.,.). •. ..:-/::-•'....,...... ..::• .....' - • '.'.;''.'•.:'..."' .!-*..... :.'.•''''...‘.;:f:,..,.: ,:••••..t.,''41 ..r?.:-.... ;•?5,....:! :..1.7(Y..';,-,,,i.t..'i'i;,;'`.-4'•••,1-.P.:-.•'.:•:.1:;.:"-f':•••?•..,.:;'..'.,:... '. :•••.•...-,....:::•••••.•;=';':.. .,g.-,-;=...".'::. ..;'•-'.•..:'..."',...4:4•:,?.4714::;...:' 7-7 ':, :: - ': • .... 1../,.";...r; - .,:;'''.i'•...'-...'.:•.::..•' :••••.:Ti'...:''..':•••.,...,:z.:•••••:'..:;::.4.1:.:. ....i...?il..;?.';;.4.. .....%75,'45.4',i:::...`:':.,';;;,:::...:;.;..,..,... .t.i.;:,;;,.,'21:....'..',. ,7-(7)Tary'PlIb i i ...-...::; . .... :":..;-:''''.. :- :'';',''':.'. ..... •• ,...,,:-::•••`:'•'..::'...••• : :.....:i.',.'......:.':;.L;',...,:..:-•::"•*.'.':•::::-'.72:1fi *,::ti.,.::::f.:11it:Z.*;:i:a:::';-•:::,:4'.':;:J'-.7?..:•!•• ...,'..;''..;.: :. ,;•5:'''';'?.. .i'••" biann-'1.-•. Q.-•' •'. .,-.eifmhtilgafl• ..• '-• ' ' '. ...' . ".-.... '•;;..i.'......:•••'•.'...."..'...:.,',.•••..•..;;...i7;:,:•:•:.p.f,':,.4q ,''',;....??'-'' '' .3r•<07ii:•-4MiS,,,-"..:k?';;:c;".1', ...': .:........,....,...i:'::,;.v:;4:i''....:2'.:•,,,.., ,' •,.-:,a-4•;.s"ta, ; . ., .,.,,..„. ... . forg • --,•:•.•,-..,,,•,-,:;:,;•.;:: ••: 4agoatt:C•-• .•.. ,.,iccs:July.2..)....4''..?•. • : . ...-•.,,• ,-.: ..„•, ,..,..,;.:...,,..,.........,.. :•,.,,,..;tittfvA4..::‘,......•....,..,,,:. ,.,t.,...,..,E,...,,..... ittaect,w...,,,,,.......„.•:•.„...,:....,,,,i,...,„.: ... . . :. -..-).-.,i';','!•;!..':':.?.•" ik.li•''• 'onwaiSi•ipr!:•-•-. :.:,• ..: -:.....' , . :'• . .:: • • • ,..:1 -' : :: •...,;,:,..."kitiii tigiflxcp?Kz: ...:tevpIsc.,(1-4.q..3;.,-, ,..1...:..:::ritv.:i..,...........11z ---c. '...... •' e ::. :•.-:.':/;':::: ...,;: ::. 4.: •i''Y.'...' ; ..'.:..:-.. '...'.;.'•.:. .'''!. . ::': .":. :...::.NiutnalAnt4744F07!' lXiti.iiii.dli.as... -nV,.,..- .;.:, ..?..••-14.q- ',:i. :.,.:,.,•'...:......:.'.:.:::•-.....--.;'.-... :,...::•., .:, :::::;:•::::'.?.:'••,:..:- .';''..''''...:...::.'.'::: :'::•..1...' •-• •••• .f: .s President:-.bf:ff:f40k .m7t.,4....A.7.,..,;,'•'1,4:11,at•••,.4ici4..o.'7.,r.r''.'.,..!..:.......::,.;-,:,.......:. .p.,::.:;,.. -.1).... :?.•:: ,:, ..,.: .:.......;.'....;:.1'..,....:;..,...'' .',....;,...:.:i.,... ... •,..!...,..:.„.„-....i.,,„i..,, ,...-• .. .....: 63.....mrce..-...,.:: ..:...•-•,.......-.,kpoier'.0i:,;q1",-P-.., -•,•• .. :,:.,....,..:,.. ......,s ,• .Lf.....•:.....:,..............i. .i,.:.-.„..,..,..i:- .........,.....2:•,...::L.,',...,...•-;A7, ;16..i...,::;.,:2tp..,.,...u.:::,:;...:7....;,:.,...;i:,....„.::::.:••.,....i .,J,...,:::',....,. '''?'...... qiiO.:'•11"d" 1147:-.•-•? ^-6v.-6f tl.t.''i:•)111 .-.•:-•,'. ..' .'••••••:.• '..... '''-• ••••' •••".T..'1' ,....',.4•••;.-•..:•::.-.T.'..'.........:.'c''.:."...,'..i......i2fli'dAy44:99'!/''-i:v.,1‘..7r,,-;.: ..:;:•.1....::*.,:,t, .:•g;'..:,....':•;1.s2: ••:-..t ',...-:. •i,...:•.;•:*,s':''....,.'...... ;. ,1•ct(..d.V.p.1e17..-4.-..., :.,'.:,:li•-••date.:, ..., : :. : s ; ..•......: ....;..': -;,....7::.:if:•7•••••.:',•:.,-;-•''•'•i•a •.:•11%is':.____., ,••,-;,IrcY..-..P444.4.:irj.1-V.•:"'•••• ;:;V..-••••:';',.1,14:.P.i.'"•:.'.'.'5...:',.....'•:?•'i '4."-.•.r.„.....,..:.,--,•-•gntrect•,-,,.. '•.,....-.,..',..,.c. -e,„t as-o, t•1 ... ;- • ... .. .. ..„ •••••" •.:..:..., .,..he...cona ......,,...,..!...:ff.;,1,-'.••':,,....•._,. .„'...,...5.......:4..,;.,.. ...,.4%.,...- ;‘,-i.......,..-4,;,,,,,,,,,,.;:,.',4i• .1..,,.:.?,.-•• • ..;....1;:;:....iv:..'':::'•'''''....'.',,.,1.qgififi..:i'(51'cd'41 ._ !-`...."' '''.. . . • .. ... • ......4•artHi",•affie.d.:tile:s!. .!•'') .....-.,:•••••••)1.-...:,.....;:•••!.,..... ...:;,..P.'"• .11;',4 ;..',.::-;','V••'•••4:1-: ..,:k,,'''''.. -7-...T:-....;:..i.".,.E,g',.:...•:::,:':'.7.k.!3:A..'. ''' -•• " - • • '''''....,'Ll' •',"'-.. - '' tl.:-...:.,i--,,,,,;•. : ..,-e3:::-.7.,2••)42.t.....--7-'1,.:.'•'' .-...-:,....:*•...... :I:::'2...::::.:•;''''•:.:::.::•.1.-:1:i,;7:: ::l.:•';''.::.... - • •. ,n, ;.,..i haN;6 w-t riT.Y 1 '. .... ••••••••:.... •:,......."•.:• i:•:'-..:1;:..,.: ...:,:;,....'.. J.,, •.:;....:,..-.4'....,.., .. -...,„-..„,a• 14.-,..,p,-„,,,.,,..,.„-.,,,.,..,,.:,..,:............„ .. ..:,......: ".'''... • -,;-Vrfli g 71.IT,---t'.,. . .--.... •-• : •-.. .•--..... - .ii.,.. ....-.,...i.,,,7'••••••1‘•••• '::' - •••• ,' ,4•'.•:•.:qice,P.re,$/,',tR... •-:.•• •' •,;.•',-,',.•..:•',7.3,!.....,.i.•:,;,......,;-. :.. .-.,•,..•.. :.„••••..,...., ..',;.•..7,..•;,.......:•:f1%.,.;.c.-4NvIT N E.:3i'. ..'.,••-.: .." ...;'i.. • • -• , ' • • •• ...., •':. -. - .::.'..„..,t .. ;:',,..,,,d,',6ii:::E; c1ITIcAP-i:•:•..,...,,,..•••••',.;,-;.,•;::Mf,. . ::i•;::::?...:"..;,....,:, :',4,..1.-..,•!...j..'.:4- ....:::;-.....f:',•:,::•::••••-,--, .::,'..., . .-..,.7.,",.',:•:;;,!....7:.'"f,...4, '.'.••-::.,...,•::.:' • .... !,'••, •• :'' .• ., ' . • . • ,•••••.1,... •'...,.....1,:„:-.;::".,.,....•,...iF7i:"'..fm•:."7:fr'••.,,..,..,;;;;;;•*.:•,-:•.t..7••.•..."...7•.'. 7:...•::::',:•••••',:::!•".:,.17,`•••.^...:'..12!•••'•.::',.:Re•sr,...••••••':•, ;,i.. '.7...;.••!*::4:•;,;*A''.4,. .,;•..• -.. '..,•,.. .:'st,t'.:',•••••••?. .Ifi”'..:.•;•.,• • •• : . • ••••••••''.•• ,• ••••:7'',• .'• • '.•••••''•••,--.. • ::-...••••:.•......••• ...•':',...'"....: ••;......;••-::‘,;1..1.•',...•..,• •:•,•.•••••••••'.• ;L.,: •...,:•,.:•',.,•••!.,....,%.!..7'.:L!;. :•••••••.E.••', iitE01;§.P'' .. t:i•?k.l';:••:•I'lf;'•W,.:. • ..:••• f,••••••4••ii•;.W•:':••••,:.....'4.:•;••••••'•••••:•••••;•.: ••• • •• ..: .••' ......-•'••:••:••••'••• : , • '' •••,-... • .'....;•;•..'•:••••••...-";:',••;...........:,.....,.',••;:••‘•••4.•••:.• •••••••••••j••, :•;,.....i.Aii4, 1itpC71,73....? :f.:.,9;,..:,..k.•::::.;:.'i;s).;..-,f1...::'.. •:. '-':::"..-1 ::, ;..:-:.•,-1.1,•••.... ,•:,...:.,:•:.;•,fi,...;,,•" ..•!;!•-• ..•.. • •'..- .,. . . . ••......'..•.. • .. • ...- .. ...,•,.. .. ..,... ..::•::::.:,....,y.,.-......:•:,. ,•,-.i,..Ap,opg,.::•,;,..i::..,:::)•,:•••4•.'.fiii....,-,. ..,..1.2•. ...,,,,•: .-.7....:-,..-m,,,,3,,s44:,;•.'. . ';'4,....,•i • •:,...i.,.....••••••y,,...•.•:,,,;,..•••••':!:-...-.... • . .'., • • • • . , •••-••-••• .....,..,-i•-"-.:...-).-7vrj'p'111.1DA,.f.''f,-...:...i.;:..:.,..1-.z.......„.•:..,•,`-',!:''14.!. ;:.:..'i.,,,:t.. ..Y 4-:,',;•..i'A,:l.•,: 16... 4 .•"...;','::...:..::,....\:-•:':'::,.•.': .',..'.•. i • . . .. .• • •....:•. :.2,• •;•f;1;ri 719.b.?....:1.•''••.... •-• .•:: •..!,i;•:.;-:.......7:•:- •.:.*,.';.;:j....,:..:,....•:'... "?.•;.,t•.,:;!ir.!:•.,:i ,,,:;,;.1;%.,E.• :•';',..S:.X., .•:•7••••,1'.1),,,,1::.:„..."....44....• .,,.;•;i•'..V.•,..:•' '',....''•'.....,••••'..,.."'.':•,•'••-.:'••'.:'..:... : . • .•• •! •s:•.•.:•'•,•• „Is-,..•A.CEZ IL rzl''...).'''-:,'•':.....4.0409 '.:!.•:,-;:i..F.1!•::',;-..';','m:..i.-..'.,-,..,t;(,.:;.,,-,.•:i,.,.•Iy.: x:..:>‘..7,........ .•:!,..,,,.i:j.„,,,....1,,,.5::z;i.4.:•,....,..,.;; :•:...i..,:7.1,:!..*•?°.4,1TF.:.'..4..",:s' •r'..'•:•.:.;,;..*2';'- :..‘...f Z..:......:::g.s.f.'.;,;1'.•.•- .:'''..:-: -i L.E:t.i.kg•as•'.:f):9•,:,•,,•"1.:•,-•:--,:•••• ,i4RAiOTr:Ti••'' •.,:,:.'-.-i.i'.1',,L•,-..7....:,•Vs..s......,•7..., ••••••; 11:;-.i:••• ...;•.'.,•,?•,',....,.'. ,•. ..i.•:!:•:;,:4'..:. ..'-..,:;:,v.:4 :••'.-.....,...:.:,::'•iff.•:-...a.:,•:::!'••••'....:::.,.',...•.....1,f.':.!...:••..:••• •••'-.....' '. L f4Q••:;•:••:::: :;1'.:E :iiiiii'•I'Y .!74:4:';'‘/-4..,•-ii.R1))1.4•:E!--:/..5:•:u1!; .?.''"::•ii: •••' •-z- -. • ,....:-..., '.-.H.;.'',...'.1'.:•-:'...';:.1'.'......-•:. '••••••,•,:,:';';....'.,:i .f.:•..-',..'::.:.'•:::';'•; :..';F::.':•,:',...';&...-';',.•:?..':-. ...''''..'•:-.' ; .,..)::::'!"."''...'....::-.,•••-iii• or.c.7,...:?,.qi..• -..;•,..,i,t,-• •:.•;,....-.. ... - ••• ,.:;- -•••••• ' . .-....-... ..,......:,....-.':...,..,;.:•,:•;..••,..!..!.....,...,...::'...i.,..• •.,..:•.'••,.-•••••., •- - . . . ....... ... .•,,,._•.-:..1-_,-. ,..•,..::..,!...„,,.f,' - •. - 1-Y,7,•-q./.1': • • . - • . . ... - ..... •. • .... .. . . -y•-*---1..:',..:.!".,!.:::',.:2,7.*::,:,t• ':......,'•...s.:.:f,.....7-."..'''''' .' — MA Document A310 — 2010 Bid Bond CONTRACTOR: SURETY: Florida Construction & Engineering„Inc. Frankenmuth Mututal Insurance Company - 1 5 Bentley Drive 1 Mututal Avenue Miami Springs, FL 3,31313 Frankenmuth, MI 48787 •OWNER: . City OF Miami Beach 1755 Meridian Avenue Miami Beach,FL 33139 BOND Ki4t)t'ilT; Five Percent Of Amount Bid (5% Of Amount Bid) . • F ,C•iC C<T:VVaterprooling-Traffic Coating Sorvices for Parking Garage Decks 17th Street Parking Garage • Invitation To Bid N'o.:2018-232-ZD The Contractor and Surety are bound to the Owner in the amount set forth above,for the payment of which the.Contractor and .1 • Surety bind themselves,their heirs,executors,administrators,successors and assigns,jointly and severally,as provided herein. The cordltiens of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid dacumeets,ur within such time period as may be agreed to by the Owner and Contractor,and the Contractor either(1)enters into I a contract with the Owner in accordance with the terms of such bid,and.gives such bond or bonds as may be speclficed in the I::d i:,g crCutl;::tct Documents,with a surety admitted in the jurisdiction of the Project and otherwise acceptable tothe Owner,for if . the faitteld performance of such Contract and for the prompt payment of tabor and material furnished inthe prosecution thereof or t: (2)pays to the Owner the difference,not to exceed the amount of this Bond,between the amount specifified In saidbid and'such • i • 1.rger r:?;'aunt frrwh!ch!he Owner may in good faith contract with another party to perform the work covered by said bid,then this • ' ' obligation shall be null and void,otherise to remain In,full force and affect.The Surety hereby waives any notice.of an agreement between the Owner and Contractor to extend the time In which the Owner may accept the bid.Waiver of notice by the Surety shall ' •not of Ply to any extension exceeding sixty(60)days In the aggregate beyond the time for acceptance of bids specified in the bid c;oco- e:Its,and the Owner and Contractor shalt obtain the Surety's consent for an extension beyond sixty(60)days. if this Bond Is issued In connection with a subcontractor's bid to a Contractor,the term Contractor in this Band shall be deemed to • be Subcontractor and the term Owner shall be deemed to be Contractor. • • >rknen this Bond has'rneen furnished to comply with a statutory or other legal requirement in the Location of the Project,any • , prevision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and-provisions con;;nrrainp to such statutory cr oth.ar legal regr.reintent shall bedeemed incorporated herein.,When so furnished,the intent is that this Bond shall be construed as a statutory bond and not as a common law bond. . • • • Signeif and seabed this 12t_day of,Octqber_ _ _2018 _„, • 4ti;,:.r:ss;°�aresst: Florida Constnactibn&Engineering, Inc. ..,;:':-,...;:----:-1.•, _..--,4-;------7,--7-!:-:—.;---• •- ._--..... (Principal) ----,,..‘.,. ........L.—..............._. may: ,a,�y ._ ./ _..1. • Frankenmuth Mu tal Insurance Company ....,_ ' i 4 /f { t ...... .,_ .- J.J.,........._ • By: :: • -..: • - 4-vrOty) gJ Li Warren M.Alter, Attorney-In-Fact L _ r.. %Ilia cieeunterr.t. con•}-oasis to ATA Document A33.0 — 2010 BID BOND. THE AMERICAN INS-T3TUTE' `- OF ARCHITECTS, 1735 NY AVE NW, WASHINGTON, DC 20006. ' r. . s : • i C t • /r) !.;.•;',."•''., &TA,NKENMUTll MUTUAL INSURANC•E COMPANY ? s .. ROWER OF AI"'tORNEY ,N • 'KNOW' L,.. ...• .. I' 1E,il .i'IdE5lc N rs,tliat Franlcetimuth Mutual Insurance Company (the"Compri y'j,a corporation duly organized•arid existing under the laws ofthe State of Michigan,having its principal office at I Mutual Avenues lvtanketuuuth, Michigan 48'787,does hereby nominate.constitute.and appoint: • Warren.M Alter Jonathan A Bursevieh, David T Satire Dawn Aus�ttz r t • � ,ty` � s 7•a�'� Theo trove and lawful attorneys)-in fact,each-in their separate capacity if more than one is named above,taniake,exeGttten seal, ▪ •acknowledge"and deliver any.and all bonds;contract,and utderta.tngs of suretyship,with•the•exception of•EtnaactaFGuiraitty Insurance,iiiovi-i>et•,11 we-rer,d'-it the pen31 sum o;;:.•ny cine such v stniznent shalt;not exceed the,sunt`of : • Forty.Mill on tnd 00,1O0:11o41aisr 040;00%9.9 C)::) ,'.!'--- Y • •This Rower of Attorneyis granted pursuant to the•following Resolution dilly adopted ata meeting o€the Board of Directors of Frankenn-iuth Mutual Insui anre Camp.inv:. ":i' t `:r'i , RE .i�� I),'that the Pres dent;:S•eni ••,... r Vice P,evident or Vice President;and each„ot thein under their r:pecttGe. sp designations hereby is,authorized to execute puwers of:.attorney,•and•such,authority can'be executed.by arse of facsu int:sts r.a<u:e,which n>a;�'.•i at; stea o:.rknuwtedged by any officer ofthe•Company;qua'Lifying tEiiettomcy(s) nani:_d i.n •the•give.-i,p•dw',of attornev:-.,...,:i o execu o-i behalf of and acIatowledge as the'act and..deed of,Frankenmuth Mutual to urince L.`oTr pa }r on ill• b•o•nd;conrr• ict•s and um1ertakitzgs or•suretyshipw and to;affixt t te.co .nrate,$eal ; , thereto. • F •••'''..'..'..i.:,..._;'.•'...::..1:::::.........:•...-..:.• ...... ' i t t ,,. : WIT'''.; •,'W•H�.REO•••••' •Coi?ipa•:v• h is i;aused thesepreserts to be.:sig`riedand attested by its appropraateeofftcers.and tts corporate seal hereunto afti�ced this 1 i t11•d y of May,2016 ;;I:::-..,,,,"i".1.,..••••••.1..:::.:.........,:.;....::•:,,,:".5,...!..:.....:1,:',:.;.:..j..::;.:: Y • . s Franker m uth Mi'ui°utua#[na.�ra nee Company t ti (Seal) 1 • ;);rederic. A Edmond,3r, ra= ' s • President•and-Chief; pera €ftcer`. • O ting Q j i � CTA Ps-OOT MK 7.t,lC,v' ; • ' < • i ESworn to"oe;:ore"me a;Notary ubi ic;m int.tate..of aVfich: •'• •v l rederick:k Edmond's Jr,4-'...':::::::..3...",..: ::'''.. tme personalty known to:hey11 tndia<.iduat and .': , gffcei.''-'• tbcd.iii ad wF.o ef,��utcI the•p«ccdrn instnimeat;duvou f anu• sand the Corporate Seatand•hts•stgnature.as O,fi et weceaffixed and subscrrb�..w sal 1.instrumt.rz;,y th authorilt cf Le:± ampany r ' IN••,', Flt Or;I have•set•my'hand;and affxcd my Oflicial Seal this 18th.day of May 221.6 ? f 1 , k 7 //.d..�:i:�R rz.a �A' (��f.�-'!”•a`�./ • cs, e• 3Q T Di iiu L.i'css Nit ry Fub tt ' . Sana: (.c!:i 1 S.al.,•o9M-lirgan' rr y ? J • • • • • buy Contntis.iJr :�:,�ires:July 23 20l .. • 4 1: ' .r • :;.::;.::'..::::- • .. .: ', r f - Y tt' rt+• - > jtJ,• the undersigned,:Vice Nresident of l:ranl e•nniuti:Mutual Insurance Compa•ny, do here•b certif•y that the•fo .. isatrue, Tcot ct a 4 eotnptet-cc'cv of the original.Power of:Attorney-that said Power of•A.ttorn.ey has not been revokeci,,or gscuidred.attd. < is Ytt full±!�,ce a rd•efferr,as.�f this'date, • I' W...TT,: e-e 1,';r"I7-.p F;C r,I lave set myhand and ifhxed•the Seal o • f the Coinpaa this 12th day of Qct er -,2018 � t ` . i=77(. ��T 7+yam y� � r ,`> 7' - •t/t1...••:..,;::'...• • ••••':'.:'.--.-•.';f!.;....-.' ,;',a:Y..1,:-1,,,--.-..,:„:„. '":art ew H Knudseit,'�tce Ptestder�: ' • ,eels- ..0.-?%747;•• rf.►r. •'7 • i:S (.1'1'% L;;'JC h FJ, =:r1 h1 aOrND f�.JI EDf[Ta f,NAND/OR A CL tf S$OULDR :' ,-.t c ,U„'I o :; V�YPS�4ri E:F�Jr4'i.i t'L.S 7W r i L rf•L i 1ARi'f 'r�;nfr n4o �•• , ? q ( , t t 9 ro ears N` 10/25/2018 . DBPR:D'JAHANSHAHI,HAMID R:Doing Business As:FLORIDA CONSTRUCTION&ENGINEERING INC.,Certified General Contras... .. 1 • . . 1257:39 PM 10/2fi12018 Licensee Details • . Licensee.Information' • • .• Name: D']AHANSHAHI, HANID R(Primary Name) . FLORIDA CONSTRUCTION &ENGINEERING INC..(DBA Name)_ :•.' . :. Mani Address: • . 155 BENTLEY DR • : . . 'MIAMI SPRINGS Florida 33166 . County: • • DARE ':;,..:. License Mailing:.. . LicenseLocatlon: P O BOX 1426 . MIAMI SPRINGS .FL: .33266' County::'. . DADE: ,...... License Information . •License pe .:•;: .: : • . Certified General Contractor ;' .Rank ' - Cert General cense Number: CGC03$438 .:Status: : ., •• .Current,Active • .. Licensure Date: ' ;12/05/1986 . ;: Expires:. ' • • 08/31/2020 , • .. . .•Special::Qualifications : Qualification Effective ' Al ternate Names • .. View Related License_Informatiort; View:License Corn aint . . ••_ • • • • . 250i Brace Stene Road;Tallahasse• e Fl.32399::Email:Customer Contact Center::Customer Contact Center;850.487.2395 . The State of Florida is an AWEEO employer.Cggy►jjght 2007.2010 State of F7o.idatarlv.sa staten.ee. Under Fiorlda,law,email addresses are public records.If you do not want your email address released in response to a public-records request, do not send afectnonle mail to this entity.Instead,contact the office by phone or by traditional mall.U you have any 4uestions,•please contact 850.487.1395.•Pursuent to Section 455.275(1);Florida Statutes,effective October 1,2012,licensees licensed under i2rapter 455;.F.S.Must • . '' ' . provide the Department with an-email address If they have one.The emails provided may be used for affldal communication with the licensee.. However email addresses are public record.If you do not wish to supply a personal address,please provide the l3epartment with en email. • , address which can be.made available to the pubttt. ,htips://www.myfloridalicense.com/LieenseDetail.asp?SID•&id.97DF12F01F04914C7681663D98AD946A ' " •t/1.• . • • 000721 Local Business Tax Receipt T1 amii-Dade County,State.of Florida _ THIS IS NOTA BILL-DO NOT PAY 1685578 . DLIONVESONAMWLOCATUON RECEIPTNO. EXPIRES FLORIDA CONSTRUCTION&ENGINEERING IN(RENEWAL SEPTEMBER 30, 2019 155 BENTLEY DR • 1886678 Must be displayed et place of business MIAMI SPRINGS FL 33166 • - • Pursuant to County Code Chapter 8A-An.9&10 OWNER NEC.TYPE OF DOWNERS PAYMENT RECEIVED - FLORID&CONSTR Il ENGINEERING INC. 198 GENERAL BUILDING CONTRACTOR BY TAX COLLECTOR • . ... ... GC038438 - 00.OB/07/2018 5 • Worker(s) 1 CHECK21-18-077439 This Local Business Tax Esoolptaelpseams payment oflb*Wool BusinessTax. H.cstpt nail hunt.., rook ors osrdfostion of the hohtufsoasliflostloss.to do business.Holds,most aatyty WEI soy gsvanaasntst srn-nyunnaasnbl resoling Iowa'misestimating*which apply to thr boohoos. •Tb.RECEIPT NO.abase most bo ilisplayoE on all g.aa.ardal vehicles-Misal-Dada Coda Esc M-Ela. fir team laforraatlsR skit RISYLEEECIIEgLERBEEWUERN • 1 D&B Suppler Evaluation Report. Upon the request of City Administration after a Bid has been submitted, the lowest and best Bidder shall pay D&B to send the Supplier Qualifier Report (SQR) to the prospective Bidder and the Department through electronic means. The cost of the preparation of the D&B report shall be the responsibility of the prospective Bidder. i TAB D -. PREVIOUS EXPERIENCE QUALIFICATIONS AND KEY PERSONNEL ;` PROPOSED KEY PERSONNEL: Project Manager: Hamid Djahanshahi will be the Project Manager and the point of contact on this project. (Please see resume attached) :. 'Construction/Superintendent:.Reza Djahanshahi will be the Superintendent on this project(Please see resume attached) Site Foreman: Isaias Cranza will be the Foreman on this project (Please see resume attacked) ? Estimator:.Roya Kathryn Arabi will be the estimator on this project (Pl. ease see resumeattached) • PREVIOUS;EXPERIENCE: Please see attached . r • 4•• FC&E ''� . tf - r ► P • FLORIDA CONSTRUCTION & ENGINEERING, INC. . 155 Bentley Drive P.O. Box 1426 • . • Miami Springs, FL 33266-1426 Ph: (305)883-7601,.Fax: (305) 883-1514 • Dear.Prospective Client We appreciate this opportunity to send our,Florida Construction&Engineering,Inc.,corporate, ' resume,for your review and subsequent use in selection of a qualified general contractor for any -. of your construction requirements.FC&E is celebrating thirty two years in business in South ` . Florida and we wish to extend our capabilities to you on your important projects: ; Our accomplishments as'a General Contractor in Residential as well as Commercial are outlined . in the partial list of ro ects enclosed.Althoughour co orate office is based in Miami our . .. . P j rp , operational area encompasses the entire State of Florida: As a General Contractor and , Construction Managers,our experience and mobility allows us to efficiently serve a wide and: • diverse territory on behalf of our clientele. Throughout the years FC&E has accumulated an assortment of projects,with contracts exceeding ; • millions of dollars.FC&E has always delivered its projects on time and within the budgets set out in their • contracts.' : Thank you for taking the time to read this important document of our performance duringour last • Twenty eight years of business.We look forward to hearing from you in the near future todiscuss our involvement in your plans and on your important projects. Respectfully, • is • Hamid R.Djahanshahi. President • HAMID REZA DJAHANSHAHI 61 Deer Run Miami Springs,FL 33166 (786)271-0656 • EDUCATION" Bachelor of Science in Civil Engineering. Ohio State University,Columbus,Ohio(December 1982) • • Areas of concentration include Structural and Construction Engineering Bachelor of Science in Mining Engineering. Ohio State University,Columbus,Ohio(June 1982) Relevant Coursework includes: Structural Engineering Principles Structural Analysis Basic.Reinforcement Concrete Design Principles of Rock Mechanics • Design of Steel Structures : Geotechnical Engineering Wood Structure Design Cost Analysis . • PROFESSIONAL BACKGROUND General Construction Contractor,-Florida Construction&Engineering,Inca Miami Springs,FL (1987 to present) -`Responsibilities included oversight of all aspects of assigned projects. Design:and Construction Engineer,A&M.International,Inc.,Rockville,MD. (Jan 1983 to 1987) Responsibilities included analysis and design of low—to mid-high rise residential,institutional and office building of,both steel and concrete material Research Assistant,The Ohio State Department of Civil Engineering,Hydrology Laboratory, - Columbus, Ohio(Jan 1981 to April 1981) -Responsibilities included collecting geomorphic data for a U.S.Geological Department sponsored project in Ohio River Basin. . Resident Manager,Hill's Apartments,Columbus,Ohio(June 1979 to Jan 1981) Research Assistant,The Ohio State University,Department of Civil Engineering,Division of Materials and Design, Columbus,Ohio(March 1979 to Sept 1980) Responsibilities included preparing and testing samples for two research projects:A Statewide Study of Subgrade Soil Support Conditions and Optimization of Design of Asphalt Paving Mixtures. • Maintenance and Repair Assistant,Ohio Dominican College,Columbus, Ohio(June 1978. to Sept 1978) PROFESSIONAL AFFILIATIONS Miami'Springs Rotary Club :American Society of Civil Engineers(ASCE), American Society of Mining Engineers(ASME) • HONORS f AWARDS `; Recipient of Engineer in Training(ELT)certificate from state of Ohio Chi Epsilon,National Honorary Society for Engineers • Achieved a 3.0/4.0 Cumulative Grade Point Average,The Ohio State University. Recipient of the Mining Engineering Department Scholarship,The Ohio State University • References Available upon Request MAHMOUD REZA D'JAHANSHAHI 61 Deer Run Miami Springs,FL 33166 (561) 747-9382 EDUCATION: Bachelor of Science in Civil Engineering,The Ohio State University, Columbus,Ohio, 1978 PROFESSIONAL EXPERIENCE: 1999-Present Florida Construction&Engineering Inc. Miami,Florida Construction Site Manager—Responsibilities included review of.schedules :'; ' coordination among the various disciplines,resolution of daily design and . construction obstacles.Performed as a liaison between Inspectors and other trades and disciplines.Studied all contracts to ensure jobs performed are in • accordance with the scope of work and do not exceed the project budgets. : 1992-1999 Techno Electric)Inc. North Palm Beach,Florida Owner%Manager—My Spouse and I are sole operators and decision makers of the company.We are committed to all aspect of design and construction which includes estimating,bidding,financing,scheduling,marketing,job supervision, advertising,purchasing,invoicing,drafting and calculation. •. • . 1981=1991 Bechtel Power Corporation. Gaithersburg,Maryland Civil/Structural Design Engineer-Responsibilities included analysisand design . of steel and reinforced concrete structures. • Performed calculation on frames,floor systems,platforms and retaining wall of power generating plant to assure compliance with AISC,AISI,ACI and AWS:. Checked Architectural drawings for accuracy. Job Site Experience: Assigned to construction site to resolve structural design related problems. .. .. Interfaced with other disciplines and construction management for the expeditious resolution of problems to meet the project schedule.. 1980-.1981 Great Lakes Supply Co. Cleveland,Ohio Structural Design Engineer-As the only engineer had total responsibility for. ' • designing and drawing industrial and construction material handling device manufactured by this company.Other duties included testing and inspection subject equipment. 1nk ArcED• . Roya Kathryn Arabi 8195 Copenhagen Way Boca Raton,Fl 33434 561=218-8782 or Cell 561-306-5753 E-mail:rovaarabi@i vahoo.conf SUMMARY OF QUALIFICATIONS Highly organized and detail-oriented accountant with over 10 years of upper level experience. • Proficient.with Microsoft Windows, Excel and Word. D. Extensive experience with QuickBooks and Peachtree Accounting Software. EMPLOYMENT May 20071 - Florida Construction &Engineering,Inc..Miami Springs, Florida •Present Accountant.: Tasks include: Oversee payroll, account payable, and account receivable : •functions. Generation of Pay requisitions for current/pendingjobs. Participate in the compliling of Bid Packages. Completion of all month-end reporting May 2001 Arabi Business Solutions,Inc Boca Raton,Florida. Present Owner/Accountant. Tasks include:Automation of accounting processes, extensive account reconciliations, completion of month-end reporting,multiple audit projects, generation of proformas and budget analysis for operations and business plans,payroll is processing and tax preparation. Feb 1999-:.. Chalk's Ocean Airways.Ft.Lauderdale,Florida. : • Jan 2002 ' Controller.Responsible for cash management,A/R and A/P processes,prepared all month-end financials,preparation of all documentation for CPA's audited financials and annual tax returns, monthly and quarterly tax reporting,periodic budget projection I formulation and analysis. . Sep 1998- Gulfstream International Airlines;Inc.Ft Lauderdale,Florida. : Jun 1999 Assistant to the CFO Duties included financial analysis and budgeting reconciliation , • duties for month-end reporting 401(k)-benefit management and assistance in cash. -,::. • : management of the A/P process. ;Tan 1997 Gator Leasing,Inc Miami,Florida. Sei 1998.. Assistant Controller. Duties included biweekly payroll processing;:personnel file and. employee benefit maintenance, equipment licensing and management, assistance an. month-end reporting preformed all accounting functions for a Gator subsidiary. 1989 .1996. • Airways International,Inc Miami,Florida StafAccountant. Maintaining files, managing bank account records,providing. • inventory control, and assisting with personnel issues. Shared duties in the airline's reservation department,customer service, and flight operations: EDUCATION •. 1994—1996 Bachelor of Science,Accounting ' Bachelor of Scienee,International Business Florida State University, Tallahassee,Florida 1991-1994 General Studies Florida International University,Miami, Florida • • References available upon request ISAIAS CARRANZA 17360 SW 232 ST LOT# 4 Goulds, FL 33170 / (786) 208-4907 / isaias87116gmail.com EDUCATION:. * South Dade High School EXPERIENCE:. * All kind of construction work: * Operator of heavy Equipment SKILLS: . * Project Manager WORK HISTORYe * Construction 1 EPERENCE * South west trailers / (305) 257-5191 *. Lemus / (305) 305-7157 LANGUAGE:" *English . *Spanish - • .. .L. i • ' . . : . . . . . PREVIOUS EXPERIENCE • r Reference 1: Owner/Entity:City of Coral Gables—Department of Public Works • Contact Name&Title: David Galeano,Civil Engineer Address: 2800 SW 72nd Avenue Miami Fl 33155 • Telephone: 305-460-5017 Email:dealeanoCicoraleable.com Narrative: . Scope of Work for Parking Garage#6—Merrick Place:This project is located at 51 Aragon Avenue, • Coral Gables, Florida 33134.The scope of work is limited to specific areas of existing facility;an overall • synopsis of the scope is as denoted below.The managing general contractor is to become familiar with the overall scope described and illustrated in these documents.The contractor is to visit the facility and ;. : verify existing conditions. • 1. Egress stairs 1 and 2 including all associated vestibules. a. Lighting enhancements by replacing the existing light fixtures to LED type; b.All interior walls are to receive new paint as specified;c.All interior,. floor surfaces are receiving new sealer;d.All entry doors,hardware and frames are to be replaced. New assemblies are to meet existing fire ratings;e.New finish on egress stairs hand and guard rails. : 2. Elevator waiting areas(all levels) a. Lighting enhancements by replacing the existing light fixtures to LED type; b.,New LED lights at waiting areas; c.All interior walls'to receive new paint;d.All waiting area.:. floor surfaces are to receive appropriate sealer;e.All entry doors, hardware and frames are to be replace with assemblies that meet existing fire ratings;f. New Finish on all ingress/egress stair hand and guard railings;; 3: Parking Garage(all levels)a.All interior walls and ceilings are to receive new paint; 4.Service area (Ground Level)a.Walls and Ceilings are toreceive new paint; b.All Entry Doors, hardware and frames are to be replaced, new assemblies are to meet existing fire ratings;c.All Floor surfaces are to be repaired and replaced. Scope of Work for Parking Garage#2—Museum Garage This project is located at 220 Aragon Avenue,Coral Gables, Florida 33134.The scope of work is limited to specific areas of the existing facility;an overall synopsis of the scope is as denoted below.'1. Egress stairs 2 and 3 including all associated vestibules as well as all elevator lobbies. a. Lighting . . enhancements by replacing the existing light fixtures to LED type; b.All interior walls are to receive new paint as specified;c:All interior floor surfaces are receiving new sealer;d.Ail entry doors, hardware:: and frames are to be replaced. New assemblies are to meet existing fire ratings;e.:New finish on egress• stairs hand andguard rails. • 2. Parking Garage (all levels)a.All interior walls and ceilings are to receive new paint; b.New vehicular traffic coating on all ramps above any retail spaces,ramps from ground level to 2nd level. 3. East Paseo and service area (Ground level)a. Walls and Ceilings are to receive new paint;b.All Entry Doors, hardware and frames are to be replaced, new assemblies are to meet existing ratings;c. Lighting enhancements of existing area by replacing the light fixtures with LED type. • Reference 2 • Owner/Entity: Miami Dade County Port Miami • • Contact Name&Title: Frank Ramirez, Program Management Consultant • Address: 1007 N.America Way,SUITE 311 • Telephone:305-347-5508 • Email: rfrank@miamidade.gov • Narrative: Multiphase improvement project to upgrade existing utility infrastructure and • pavement for approximately 8 acres to improve the efficiency of cargo operations. The area within this phase of the project will primarily be used for heavy equipment and container storage. In addition,the improvements in this phase will consist of the following,but are not limited to:. installation of new high mast lighting, electrical conduits,utility adjustments,improvements to pavement and the existing drainage, water and sewer systems,and earthwork related operations. Size of Job totaling$5,061,850. • Reference 3 Owner/Entity: Miami'Dade Fire Rescue Department • Contact Name&Title: Edward Villareal—Project manager Address: 9300 N.W 41St Street • Telephone:786-331-5000 Email: Edward.villareal@miamidade.gov • • Narrative: Million Dollar renovation of Firehouse to Code and Historic preservation. SUBCONTRACTOR • INLAN PAINTING & WATERPROOFING CORP PHONE: 786-293-7428 EMAIL: INFO@INCLANPAINTING.NET' • • AVIIa September 25, 2017 • • . r Good day, am pleased to provide this letter of reference for the quality of work demonstrated.by Inclan Painting and Waterproofing,Corp. Inclan,Corp. has worked with my company for many years subcontracted for services including but not limited to painting,waterproofing,concrete . restoration,joint rehabilitation and fire rated installations. More recently they completed some • emergency maintenance services for a Garage in Orlando Springs.They came through providing their OSHA trained staff,flexible night and weekend hours, and ability to work in a high traffic • setting,where the garage was under full use throughout the day. I feel that they have exceptional skills look forward to continuing doing business together in the' • near future. Please feel free to contact me with any inquiries or additional information. • Sincerely, c&/eek. Avila Construction&Glazing Inc. 17304 Walker Ave Unit 122x , Miami,F133157 Offices 305-974-8031. Lic#H14062 NACH107110206 . • • • , . . . . . . • • . , - . MM . , • . • Mn .ir IN - . 'T,,. • . ...:, . .: . Inclan Painting and Waterproofing, Corp • , . -,,,,..... . •• ....,, it • Serving Floilda since 1995 .- - - - - • ' .."'''',1 ' - • ,,,Artirer 1..‘:.:. . " -........... _•- - •"'"VRithiliAltim'-- -4. % . . .......,--.• .4 ... ., • i.. . ,, 4-'-'.' . City of Coral Gables • g, . , !, • - , . „.4-7,_-.. -., . . . . . . Parking Garages ..„.0.,.....• •. -.--- . ...„..,•:t , . . . . • . . :, Garage#2–Museum Garage 220 Aragon Avenue • _:: . . . . . Garage#6–Merrick Place Garage 51 Aragon Avenue . . • • . . . . • . . . . • IN= ---'''::'.....--f•,''' ', '--17,' ': --7;:---------t- .:, ..,'i- ' •, . - . - . ... ..... . . . .. .. . . . Contract Amount: S275,000.00 ' Services Provided in May 2016 .. .,. • .. . • ........ .• • • . . --• — -...---..-.. :-f?-•-;-'•••-..;•-.J.- -.....-..- ...,:: -,,...-:2% • ... • -..--.;;;;.;..i, --* . •:.. '-';' Garage#6 •Ai .-.> • • ....••••i-7i:•:',f-. • . . . ''' ' W&J'-r-.,:: ••••:7:tc:.:.;.•-., -. •. • ...-.7'..,...: ..: Q;•-•,-.-4*•••• • - ... • . , -. . .....• •..- • .- -.-.«.,..:.::--'7.:.,....a..1. . — ..,-4.:', .-:•,:,-....:,-,:,...2e.47 • . t. . • . . ..--• . . . - • .. • .. " -:--V1.7:7::. , • • . , . • . ,r.• . . • . i . . • • • T. . . : , f• . ..._ ., - • • . • • , .. • ,, ,- ; _ . -- • . . --,-.- • . . . .* • • . . • , . . - .. . . • . . • • . , , - . . . . . • :1;.-,T:Alliillin - .. . . i• . * : _ -:.-i? . 4 _. I,\\S\V-:ik... ,„„.•- . .. ..: %I.D ' k,-7. • . . • . --- , . .• • ,, . , . • ••Services Included. ...• . '... • ‘• • - ' i. •• VerAlE3114V,74 • - • • ----,7,,,--- --,,':- .Sui-faee PreparatiOni;. • i ;::-- ::.-, ... .. .• . .,...... .... • • • 'General tepairs;.. , • ; • .. . . .... -. , . .— • - '• 1,1111 : ... -..--__.7_.. -.. ,...._ , •-•Applicatieri of.. ., . • -. • I • t 41N . - •scat. ., , ' Protective Coatings: and all whil.er•:•:-, •••..:'..,. .. : . . . • • • , . ; • • . • , conducting services .'. . .. ••.• ,:. . : 1 , • — . . • . ma busy,high traffic• , . , . . - • • , •• . — • zone. •.: .... , I • • • • - • . . . • • ‘ . . . _ . , , • . . I . . • . . .• . . . . • • , ..., .. . • • • - . i . General Contractor: ... . .• , • ....- . ;. .. VloridatOnOrtietiori& .1. .- • .-.."1'...-3-77- '.'.... . .. •- - ..., • . .• •, Eiigiiieeiiiig•;:jno:. ..: . . : . • . . •. • • - . . . . •-iI.. ' • .. .-'• Contact iM88e3:,}16a0n1ids: .• . .• .,...'...N.TnrOaiefTfis:C Mo reaaqVi.uniteerdtian.rice lol f.H. . s1...1,iap...7-.7.:,•:_o. .r,.,_ r F (305) 883-1514 oruyot .,•• . = .. .• .... .. • • . . . . • , . damages . . - • .-- . ... • . . . .. . . .. ,.. . . ,.. - • - •• • • ... .. •- . , • • . • • •• ..- . . . . . . . , . , • . . •. , Le:. . . ... .. . ,. . • ...I • . . . . . • • • . . . . • , . . • • • • • • , .. . . . .. ,. , . • . . ..,.. .. . . . . , : .. . ..: , . . . ..•. . . . ' • . . . . . , . . . . . X.Y. 11 ■t ®BA INCLAN CONSTRUCTION SERVING FLORIDA SINCE 1995 MIA: Dolphin & Flamingo Garages__ 2100 NW 42ND AVE MIAMI,FL.33126 Joint Sealant and Concrete Restoration — _ „,,•;.-4.:„.„.:.,1-;:i.,...„-,,:,-.. ';`y-'-A' ..d' „ ,,, yg'<- , r'a..w r•�4w.;Y._F .,,..•;:-• _ _ ,..,- _ .. .. 1. Concrete Restoration of Garage Wall Perimeter and Complete Maintenance of Joints pp - 2. Reinforcements as Required , Scaffold ",•}y ..• `• ! k �e r a3•�, - �- '� Equipment - - ::',.- ..e;” __-_� P Setup as n+ t` 1-- II• sou 3goi t1� _ \;• • per MIA M -.4,'r _-• _' Specs _r• • -- �. - _�,.:•— ' ,mss � � I-3. • �1• - • )tY,s�T rtt�atl t rc x c uL _ 3.Covers provided to prevent Exposure of material -• . - w _ �4.Final Product $ Applied - .. " , " • where • . -- .- e. 1 Sij Vii rl.(oncs-cgC ., a •• rN lc)rmect • Before After . R .. Contracted work for MIA by MCM F Contact Amount $429,546.67 Services Completed February 2016 - { Contact:Mr.Johnny Peterson(786)295-7661 New Joint Bostik 915 Installations throughout both Garages fill - 3E 1 a. !Q • 4. DBA INCLAN CONSTRUCT/ON SERVING FLORIDA SINCE 1995 __,..--4,` +City Of Miami Beach •• Flamingo Baseball Stadium :; , ..... Michigan Aye, Miami Beach, FL 33139 Concrete Restoration of the Flamingo Baseball Stadium • Photo of Shaping of Concrete Structure Rebars were installed in order to - - ,, '.y: create a skeletal support system. S • • --- - - - x.�.. •. '- - .'°, '' g.4j Epoxy --- _ rr � '.t. .. filling r, , - injected: ' j 5 inches • • within Photo of final Concrete Restoration Product the „ `' '•,.` "; existing �` r.,`. --4, g concrete. Rebar installation is - • required in order to - � ensure.a'secure and r 4 -safe:new structure ;: _ .-• li ' ; providing maximum . y° support. ' a An I: Inclan Painting and Waterproofing, Corp Serving Florida since 1995 MiamiMiamiDade College MDC Project Manager: i.7 Ron Milligan All Campus(Wolfson, North, and Kendall) (305)237-0869 • ' ..x Wolfson Campus ', • , • Services 7 , . js _.. Provided: - Interior Painting, -ti , Protective coating -3'- kt: - and Floor Sealant. �': + • r r`-, - . Scaffold and ----- —_ , --x17= !I special booms n ' �,�jy_A available , li/" r . "a z. - - - - _ . - E i t • ;._ if {its ;?' ..I _. i Kendall Campus Exterior Concrete - Restoration. 4 Services Provided: . . - ;J Exposed rebar's '`` v.' ' �-- . Painting,Waterproofing • were painted and : �Y► "a • • and Concrete Restoration resorted new. •Y's >,7,�-. • Close up of Custom Moldings --- • 12252 SW 128 Street Miami,FL 33126 i Office:(786)293-7428 Fax:(786)293-7430 INFO@ INCLANPAINTING.NET Www.Inclanpainting.net L� - i ) . - • - - M il it 31 .., - , • . Inclan Painting and Waterproofing, Corp Serving Florida since 1996 Zoo Miami -Floor Installation 12400 S.W. 152nd Street, Miami, Fl. 33177 , ,: .--.-•., ,.„ ..,----..:.,,--..,..-.... ._.:-.--,-,-.,....z.-...-:::-...,--.,..- --,— ._ --.:-... . -.: •?„...-.....-.: , ,..s.....t..-,,-:-..--.--, -.*7.:...i.,:,•_;:---5.---..,---.:1-,1-_=-,..-3 - . Final Product . ... , , . - . •._ • . . ' '. •. -- •_.- • --:-. • - -._.- .•-•..,.. :‘: .'-_--"- .• - , • . Z' ng. ._ .. . - . : ., 7 r.,,-.7;:::,.--3-1,:&f.-f4i:::::-.7!,..`---'-:.-'-'.. ---- -!'-"•'.4i.,._4;.....--- - ..•-*--546!"--) t2.1‘. -.--...:.:::-..>:•,...- .. -..: . • ::. ._,...-.., ,-,..-4,:-. 2: .." 1'1'7. • - .,,.." .-, „ _i . • --':'• • r- :---' ,. -. ... - '. , '•: ,': ,.-- '•:„t7-:417•,--t,.....*„. -,s„._:."-S%..1:.-*,„t'; .•.-"••• %. * , -_ 77.0.U;-,•10.A.,7-„... •- ..,:-.% -*-",--,,'r.:•P•-_,ZZ', ..-,1,-. ...„:::-.-- ...- • -'', ' • - • ' . -1. . -,•,:7,-t-4..., .:.:-.-;.-7.r.e,-”-%"--:.1.- "'...-.•.2,-...-'-:--=-_-... : , --....-.', .-..`-",:,;g;--.-•7:.-.::::::--::4';,,,+:Y.i.:-:.72- --^--- --' '. • • ' • .•-.. r.:'• I'- ....:;::';',...".:,1 .' ..-7;..-2:F.:,• .:,,,.-:_÷..-.Z.-:-..-;-:.:',..,-- "1,- . . '... ..7; . ' ' .',..!: -,..---3--..:::'-:::-. 7-.?,:::'-;:::•:?'_-'-,,,,,.: -.-r, : - ":.. .-Z- '.-:,„,-.., -:-..1.--_--i4--:,..,'•;.;,'...,...' . ,-:.- '--•-:;:-;. ' -, • .7.-4- -..-.------ -.:4--- •,..?...!-.- ••••.--....---. • -: -.• ''-'• . ; '— - • -•-•'-'l'w .-:•• .--_-:--- ..-• : ,._,::-. .--- •-•':' '4"- !.-•,-.7.-7.-•'..17:4-:;:-:•'7,e•- --.. --.. • _ -- - '•''.'• ' ._.. •-- ' ' , . ',-.• •:---•--- —,E '-';'••••• . ;' -•-'.•.,.-.- -.-.1 -, • • • • -- •:- . • •-:,"--.2',"'"'-' . ..4...;'...` • '7:Z2,;a: -."'-• '••• -'.-..., '. • :- 2..-t.... ./.: .'-:... :-...: ': ' ' - ••..•.1, : -. .••: :*. - .-.••:. ...":f:".‘'''''''''''!'-'..-•;41:i.-4/T--:2-^: :;8:--. 'n' '."' . • ' - ...'' - .• ''' '.--.=;51-s.. - - - `'i-'''' , ,. . . .;-.7. i!"-::7''''''.":- '''..- :•••:.t.:1:-.',ITA,::.-,-...-'-'4:--:.---7, •-,--.,....,`"--: '.e-;:- - • . . -• • . -., .. t•- ••• I. z - : , • Services Provided: .,.,.. _ .., •'• els. Exterior Painting and Floor Systems Installations ,:-:- ••,,,_,. -. .1,2- . _-,-.-• - ,----k----•-• • Ai Decontamination and demolition of existing flooring .::• - :•.,. ve....4..-.-‘, 1 -.', : ,,- . • .•.,•-1.:„,. ' - .'.,. , ,-,, , . • 46 Custom Floor Coatings throughout ..r. ,..1 { ‘.:' : ,„-e-a:-_—:,:._ • . 2V-.'..•.. --i .. , Completed September 2016 . s-:i.,-..-.--..•-,-. .- -•;•••!,_ ......-. ; - - •• , • Contract Amount:$65,000.00 --. - __ _= --,-- ..'"'-.4-!:.7.--:-' ' *- .. -ri-----.... • • ----- ' -eiger4,- --•-_, -..., • Contact: •,...,••':--...., ,--•----- - - •-•- . . Enrique Avila Avila Construction • i ,• , ..,• 17304 Walker Ave Unit 122x ' ;•••••••!-:•-.A.f..).:-•-••,. - . a•----- , . . Miami, Fl 33157 .... . . . . , . •- Office: 305-974-8031 I . Lic#H14062 •. ://ig,... -• -, .- " . ' ii• 1 • NACH107110206 . • - 12252 SW 128 Street Miami,FL 33126 . • • .. 0 0.7* . I, •''-. . . ' ' Office: (786)293-7428 Fax: (786)293-7430 -....... -„,..;._—..•—. ,,- • • • ' INFO@ INCLANPAINTING.NET n • Www.Inclanpainting.net ,• • . -,- • - • . a ' 41 ' • rir-.' - ----- . . . . .. . . . a n —• Inclan Painting and Waterproofing, Corp Serving Florida since 1996 - ,-. ...ri&ipp.wwi.----, s's,',,,'• ,-,.... ._ ..-• - ---71.. .- •••• •,,,,- 7...= .,,A: w-,--- . ---7.••= .i.•;•-'.-.• ..--- ..z•i,1::: _;... ; - . ; • .L; • I. Neva King Coop , Cooper EC .. _. ... la- 0-7•Y-.7--VIR:7z4M-:::;V:•-.:.:T 151 N.W. 5" Street, Homestead, Fl. 33030 - , - - • - , ---,-.,-;,--5, , „-;74,.„- --fsi _-•• ,1--..:-..,.,_:,.-• .......i....-1,„,„,,,,, ,___.„-- ...,„_.. - -.,,,,---43 „ ...„.„... ..,..-.:_,..„--_,,,... ----..-.----.. School was __ ._... „ . :, __-..4 _ .-,: ..,:.,..7.., " - -6t —••.•---• . constructed in 1914 • • ' - - ''''."'' ,t MICK — - ..., ,.... -- , ,- ,.---:,..,--,-,--..,,,. - -, --• --,----- .3111 ' -- :::-LZ.:;•_,-1. 1 --' - and is now a - - ; :} .... ,,... • - .--,...: a, - • Historical Facilrty* ___..,-,;,--__r...t.-....,,,..4_-.- sot -•._-_- „.... . 1..• • ----,r,..:.--1-• . ., ...".................. . -;,.. • . • , ,L, .- , ...... . . : i •• ..: . .. , . ..„...-_-__.7,. ..-- . , ....r.-;-.•.i.-3,e_._ ,..• _.--:-.:4 : ,...:-......: • . . . ..-. ....i-x.-,-,..Ii-- - .. . _ . _ . .... .... _ . : . -,..._,:-_,I...-::„.„:03..,..i.i.„..,1.,„ : ‘.-.e.,. * ----• •.. .. . _ --., ,,...24,...r2,..z.f.i.,.,.. . •----- .7- . • .__ . • , ...„,....•,..„..:s.-_,, _,...,.„..,„_.,.._...,...._ _ .• .•. . .,,..-'4.1.:1-1'1`,W.f.7,-, 1,-,...-...,,,.... ..",,..%...._--,..v-2.::-1. ' "••, - ' -..„,., _,,,r---t.t-,,,..-2,;----'4.",---•-•:-.•.--:,-t't,--.--.3.,,,,f----,;.;-._- .."---4,-,• .,' ,--- - .4.—- '=.,.r, ---,.:T-f-t-i-ir--'-',;:- .-2....-`&,-*1;-•. -'r-.„.,,-.'-..",.--1--•-•.-X:-.1"`: '-,-:------'''' -. 1---,-.t,--?,,!:-.,-,---,,.,_:,--45...',:-..-.--,,,,;,1-t.i,...,:.,,:j„.„,-...-.,. .-t.z.;...- - - - ,„_„,---.-=,-;..7.=%- t.S,f,,,,:-:--.-sz..c,J. -".4.- ,.......-.. 2'5-z.ity,t., -,!,-,?:-,,t....:::.=:.-2.3,...:, -,•-.-,.'"il.?"'.. ::"--31:a''..-=:.-,..-',./:•-•.•„. ....: ;4--„,,, .11'5:-:. .Ar7;',,,,r4:.-' ----3-[,,-.74.::7',•7;r1"nz•- r- • ---:''''':`•,--:".r.4:;r,,--,•,,,,,'•41.:x....-..f.i,-'..y--'';'.-2_,4.._a..-_,..--'-__!".: •- ,i.,-'--1,4cc5"..*-.47";_4.'$5'V.,,t4:-..'..,-,-.1:::,_',-;-'..'4 •. ---- : •_:•-, ._ - ' -..-3' , ,1 •-•:-±:--,,,-...? "2"-Z.4"..3'- ;.:•;";';','-'''-'7.4•7:t4'''.:.::--"II,. •.•• .- . . St -,,,,--....p.„Ifeept .,r,-.12.4.,t,,$•;,,-, 11.Wt..j,-,..-g,"4":<,s,,F iY,..'-''^` : ''•::: -" - --''- ! ,F 1-...-:- . :`,' - ''''4:. ` - - '- - i il: ..-'."..„ ..,,•,)-:::.4r:'''„"':..,---4,-.- ," ...'•-'.. -4'.."--a2,:-C.7-',----.."!,":". : -.' . • ''"--.-- t-.•5 -'. rir,21 ,".4 7 ./. . ' a. -.—....tttr....: ;L.Z,.. ',0,1,0,71. ---- -3 - . • . .- rk 4r•-•...: tc4t!'?tTlitsTr, --7.7,b7-. ' . ' .-:•-•-•-••-, 7. ._,...._-.-.7=-_:.i.._- ..--2-2. , . _ , _ I . ., - r 7 1';' 1:40V.,•,..:}". . c • - ".... ' . . ' ... , 1... lar 1.... . , . .' ' ',:Ls'i>:'''.. Xr4-t.,...s: .-- : 's.,- c-• 1 , L ' •i ' 1 - ...lin gm. i •-' 1..: 1,,,.4,;Li.'r".7,-,-,P4'4 . ' '' 1.,• y . .... - c,-,, • 1 :- !' ., ._....„--- --:".----- ---,-,--,:),-• ,s. ,- ;,,,,T.,-.,-1., ,, I 1.t.":2{,•7 '. - ''.: .' , I , 1:• . -,-..,,.4 ' , ,r,...t. ., • . ,. .., ;'1,--,t-. ' ' • ; • ' •,:, --.•— ,. ' ,•' -. --3--,...---- .. '-----:.,.:1-, "..Z.3k-.')•::----,- ."- • j • • , • • , '4 . • .:_. ,t-..rt-.; ".,,,1:"--,(-- -.-1.-&-A . ... ,:-f-t3L,-.,:4->•.-,::,."---›-r-1 -ei.- -'' '''.--- --''"'• --- , . - , ,, • • • . . s - .. ,,,,,'-i...,_--- .., --*-...rs--,:t4-,..i,-f.,%,.. ',-,,,-..”0,:,:r.:.7.,,--,:---2-:-..--1,--„--1 , -1,: '1,..-•.,,......Z. ' : .. '21 -,74,7C.-;- V,, '.A...t5.P.,..-4,,_74:-...,..._,.-...f...:-...•.-.'".?-7--.-.' '-',-,..."'1.- ' - ' ---•-.4,--1.' . • '• : : .. 1 1 .• , i , 1 Contact: 4 Painting and Special Coatings throughout i . Corey Boatel Project Manager SPD the facility Turner Construction Company I 7235 4 Demolition and restoration of Cafeteria .,:. Corporate Center Drive,Suite G I Miami, FL i'-r- 33128 Floor&Baseboards - , direct 788.621.9000 I 4 and Floor installation of Special Quartz Mobile 385:51g2901 1 CBeale@tceo:corn - Flooring System ,1 • Jittebsite-i NtIF.,kiiif I faceboCk I twitter I 4 Facilitating Complete Man Power &Heavy youtuba I.pinterei . . . . . • • Equipment • , 12252 SW 128 Street Miami,FL 33126 .- •s- -i':. , .;.,* -, r Office:(786)293-7428 Fax: (786)293-7430 .,, INFO®INCLANPAINTING.NET . . ... Www.Inclanpainting.net • . , -.711 Ni • I _MIL • , . ,,,, .... . . smil . - 1• 1 I , - • SS X ' ..--• . ,.•, • Inclan Painting and Waterproofing, Corp ..,..,.,,,. Serving Florida since 1995 '..-: -=''',.'1. --•-•1‘ • •— • . -• :::'•: '.. *.'• .-4.1-.. ,: '....--...•,<-•;' 1: z•-.: , ' : . , ,- •:-- , ••::,,,..*Aktr.a.,-x..w.. .. .'-.,-5".t..,1-,•*1.-.-.41-17:•.4r-t:.:',„ , • • • , • rg4"---.'--- - -• - — ,,- . .z.g _._.c-:.-- 1•:'-.."... ..,.'• • ' • • . ,.., • '• . - •-•• ' - _ , . • •-•'-:•-#'-':.,),.• , -• . • • - •-,-,4-%.• , ,•-- • - } - .: ;jr..-;-;' .,.:..,_=,•3-.,- --•• •.•- .- ' X.s-,41-..,- - -1:,..444". ...-:',-,'',.T4,',..•,-43,..t. ...- . . . • I • , '-'‘V.,... ..,.....„.0.44.-t. -...... ..,%F;---5`...:'. • ` .. -• .. ,. • t,,;,- - • 11,..-....,4,...3„fje•-_,X.,,-,,',,,,,,-,.:,.,.,', ,:_. ,- . • . . _ • - •- 4it. -'• :..g*,'7.-V,''''... „F., ,.:,..Ite-4.,-A,'.'-.,,i,.t.'"- ' ' .'''.' ''-s---. • . 4. ',‘,., ;14L.4,49i„.,.''c4.44:..T.,„.4.2-1i.:,'---, ..;,:,•7••',: ' ."•= '23',..i.l.:- - ,..! I. ,,,e-.5it.1.11,il.,..,V, , ---,,k". wa,,,,,r1,J...y.....zi•-?4,1,-..- ._-- --':,-...r....*,,----.'. ;_.' -..,-, ...1. 1.:„..*:•..a.,.T.q.4s,1,.1.,, _ ....,,,,-...1. fL.---,w,gi---.....,: ..14:-,,., .i...EZ--4,'',"i-,.a..".4 j..c.,_.t7i4r...,1`„1•,-„'„6,,4,-,S..W.Y.--V.p....-'f.,......151'.4-...;,....„.c,..ko,,4,-'-.7..;„..,',.,..,:.....':,'.;41.'..-.-.•?-',..,,,...,...,.:',•-..-.•A!-=.,:'..;:•- - " ".•-^'..-.,'7.--- 1. - ...., ..j.. . , - , •,5,r.I.,.=-,,. - •TT-.'''."'''.''''''il.".Til'e.',-," .1,4'11-4'-'''',1-4'-,' • ,., . _.•,-0-,...-_-. ,1_, -1•1‘.._,-1,,•••••rL.,` , ....le,...r,,,:.}...>,.,<:.-..-; ,i; ,-...-- <- ..„-_--:.„0..,....,:,':•. ,..,....,...,„ .w.. , ..,.:.,--...„-,....,„..,-....,-,.....,-,.-4.2;„7_:. -„..,.,-.. . .. r• _.;-,,,,r,,•-•„--..,-",:,-,-. - ... —- . • -•":":-.,„1.:,-2.;V:.:(:::..,,J--'''' ""-' ,,L. ,... — -,..,.{---,....:---.-,•*.....11,`...-414.- ','''-',.1 ,T, [:-...,......;'1.,'.-'1.f'''':.;-.-::: l':, : ',V.;•:-.41.4"-,,, ---c- --x.Wy-W-..-_,,, ,..,Z:Zi,..,::,....: . *".:', ..'''.1--,...t.'-'7°7-,-'-` • '''"""`,."'-':,...--4,..l....--,NA,;',,- __ • .... -;',„-.y_.,"..r.,....:,.;,..2...^,,;, -.L.%....• ;., -.,,-_,..q---",01....,.-' tr,y,.,--p,---',....."---frink••••',.-I---•.. • • -, • --..-.----r.:-. -•--••_..--•,!.._ .-:-..; .,--- ---- •-, -.--;.:"..--;•,,,,....-i,:.:‘..i.,..•.,..t., . ..,;,-...r._,,,,,.i•.,- 2 ,-.:_,•;..;,,,,, .,....-• • , e.; ••••;•::---.'1,4-1-:-.---4'.'s-1....2-r ,,-e'1!:••erVai--":%' 'e. 41 -11'''.)'7'P'77€:1"..1 t '• • •"• '' • • • '-.---.... %'--••-"•-•.-" - 1111W ' ' r. t-.-••::::'-i-_::;;; -'s E-.1'..ii=7-:r.-.,'..;v..-3,.-!-.7*, .. --., --....,,,,-,- . ._:.•:•,,;1,1fi t .i,. _ - _ • :--.11.f.-..., '-'...-,...-.,t.. ,-3,1- z,-4,,w"- •-,r 0.4 ."-q11.-11.• •1,kk 11,-,..14zypT..A .. •••- -•••••.1.: 't-"---•••-•..F.,.:•?'")••.---s:,.r.'.`r'.4-':-,•'-`.......:s•re,b'''-:.*_'-'-i-Wi."..,t''''<--. -'4''Zh',.•:.Y'46.p.4Zpa,_;''-IL,,.il-r,I • ..".. • .. ',..,..: of...-',...:.F,Tt„....•••:‘-;`:.:;:r-ctZ:-,ta--4`•._-1,:r.i.,.c....,t,s,,,,t_T-U.' ..k.,,c-1.......7,7:e.r.l,.,..•-7!--,•••..i.F-4,--4,.,'„Iv.-,,,,?•;:*••-1-7,44,....y.47;..,,i,14-41.z..' .,';,-; *- .: .. . -.. . . . •, .•...-.,-._‘_.,.; :i.,...'&::;.-.:.'-' --Y-4V,4'••414.-7-`. :.P,,-:''',.•'?1'.11''.';'1"'-"r•'• i-.,-':,•4 . • ., ... . . ,:,:;.•4::-.:-.-..-1•:-...-:4:7,:••2Y-'''-..: :-. .'4:fful•t-,t,4'-;;;:r.i. .2,- , 1.,ti:- '• ' . - • " -•. ---,t--..1-z;;..:,,....t.;;.-..v.,-..o.. ....,•..1.4#.0.,..„ ...- -ri•-•;.-,1-,i------ ,-i:to.- • ,•.-'' :'.17:;-"-i.T-7---- ,;.-e*,•=_-:-/;.-•,-:lii---;-, /,=:4•-• -1•••,;;.--14 ..-e-"?.4.-it-,1,--....•••-•.!," , -r,' ' . ..,, •:::i."---r2,4z• •.*,"Irc :b --:7,'", .'r,r-ii....',=.' '.i.k-...---,e. ...;,----....--,,,,;,F•S'.: •._ , ,,,zo....„....,,,„„t7,,,.„ , w.r. --,...,-, 0 . ,...: - h....*--kir,..,--,m-:,..-1-,,--WY: .11 ,,i.--f"...-'4";-4 ..4"t "=..C., V • • ".• ."." a17, .. ..„..n. . .s,,,,,,,,,- -, -c,. - . -`" -. -45 -1,• , • --z,' I' --4-4%-•*i :. -• • - . „ _ .- . . ...., . .,...,-. •,,,• • •1.,-4 '1 - - " -4,.--. . -;.-'""-•.--- -'-'::'"'.,' L-,,-.':-.,11%.i•-,-;*-z.2 2-z,•,..--4.---._,-----'2. -.:- • ' . • . ...-, -..,,,..., •.,,.., .- - .. ..,..i.,...,.... „. .,.....r 1 ",,„„tt, ..._ . . .._...:,:.„,-„:„.„„.....„. .,_ ....„.. .. ....:...,,...„..._ .....,.:...,............: ... ,_;„._...,,,,._----:... .:.0- .. -„ - .r.,..,,,,,,t,,...:-fd..,..,. ..,...".x-r:,.. .... .,,,,ttl ,,i,...‘,.:::-..-!:-:..-..._.:_... .,-z-z..-,. .....;:.:::::: :iiii.,. „3k.-*A.1„7„,_-- __,..i.._:.-.k.,.;...,_::.i.:1,,,,..„..,.„_, *....N.. .-.1-*'''',' "0 ..•_-;-*' .1.t.":4• ••'e;_. = ' .--,,,,.,:_,a C•t;.,,•-* ,_•,,I.,, t'"-' ''-''''':-.3.'?''---A .-.-...v., ...1,;--f_.,...- -A.-..-.......- ...-: ,...,..,...-.-,...,-, , , - .„.,,,...-..,,,. ,. .,....,-.•s•xp,_ ,"":412.,,,,,,-gmx,,- -... - .„,,,„;,..,., , ,....34 . •-,,F,,,;:...5;;:\•A'Ti.,-,•,. ,z,N.,,,-.r...-- -v...... ..,-.—...,'-.-",::::::..-_....:.."n•-..-..-r-.,-.:- ,,,' '-t-:-.q.-.P.i7.,-,,,z;11,,,1.-.1 :-_,„t.-?:-11w11r..,,,-.71.1,..- .. . .„ • .-.. . .i,..... . . _ l'• ..',...-i", ".i. '• -Wi....Vii 1.-TV•ri.'..7...Th';''.. -L-. -.--- -" • • • 4 ,..,, , . ,.>'•• '••• ,-.1..lit "...P4:'.," ;•f• .f."0.4..r1 • •:- ''.'",'.' .''.0..t.loi ;' .f•Fst,Ip+sr,V.IP it`...' f, :32.'.,' ., • ,..4 .1...,;','--- . , it.1 .,44:-.A:t .!0-•'; :.• C.'. : t,e ,,,4 V:7,, ,141lpy'it,?, . ...":t • ,o .., ,,,.•4 T,'*"'",-.1, .2 t ..1. , .i, •- - . r. --...?',..t,V,.z. ,•''1.1. i-1, :e: ..',...,r--,....... .,. ,.--__ • • • , " , . :- .;&q4,...- ,.-%,-.4r, •,-lt.iii,prk r...,',1•: "..; - - .. _- 0-4.11"•Itil'VF' ,..--s.'4., - ."•-•'''..tit r•'•,'•W.`•..- - '.- , ' .. -'••-ri,;-•jr,-..,4" - ., ,i.i.'',.:f5'••,•,f',4.,•'''Pl,;(.4.-, • _ . ::.,:•`,... 4 .V. 0 fe?7'.. 4-1-3.1.:'7,:-,`!"..'.1.-;,:. '. :. S..:;...i.tcA '•;-•r.:k.'14,-re.z.r,...-isl,..,,.....!„,,, : .. , . . • . ,..: • ....,-.,- .,---,...?1,,,, -,-,::.-r...-3,A.-4-4,-....•-1. -,-• - , • -- ., •-•,.., - -.:., -.6 • '.- 1.... ...,,,,,d. . 1.. • , .„-p.,..w,-,...,.,,...,...„.... ." •„....., ' ' ''''''41,. '.k7 ._•...''. q.'-5.-`' .14.1g a ifs'll.k' -:' ',-;5';•,:-';''.:-:_,. .• . . ' . ••-- .. : tt41,..&1,,. .. *.t.:1•.,::., , ......,*,4.!.7.1:•`..1.;:j A, . ;,..,;...,, . .--• ' -.1pri-•11- 1, .• ,-1 .- .` .• , . ..,1 P '• ....- .•(...,rs-4 ''.•,•.-'•••.C , ,-.'‘•••1 , ... ....,. •Lii'l -7,42'- 41v{:1'12W1...1'' s'''" ' .i ' •!.' . I.;--::' -+'. - ......e.,...'-v.i.r.. ..•,.2,,t,-.11/rit.,SEv.,.,..-i,e-a-VI'''' •'IT''''.. • v " , . . . r... ...V,-.5.*V4--''''''4''''‘,S-r•%*4-'71, 7..`', -;';i''''•47 - '::.a-F:`. • , 1 .1? 0&,:' ,.„'• ,'''••sAC.‘10.1,_.P(4'd.,,,Z.*::fltE—clitA4C4•S"'•114.'4: ‘.‘•. ‘1'••• • • 1".V..4.'f'71'1-", 'A" -4a-,."`,.''''','"Y i.' '... • tr." '.!..-: .4, • z_1-.5-. .-., , fee, ..e"Av".1..,v+3:',.!:}r-i..Ar..,`,:,,, '14104..r,-$'4 , •.:•••••••• •. .-sx.,,,,. - • • -t, 12252 SW 128 Street Miami,FL 33126 r • .,;., Office: (786)2934428 Fax: (766)293-7430 • . . .:, INFO@ INCLANPAINTING.NET ..... . Www.Inclanpaintingaiet i. . - , . . m L-1. KM I lilt , .• .,• _ ,. , ... . .,... „t„,..t.-„v•-,:,.r,,,,,,!;...!..;?..5„...,....,,,,,!„,,,,_44.: .7 :-z.::, .• . . ... _ •.•_ ..... . , • - .--• ) ...i, N.... si, ''"*------ Inclan Painting and Waterproofing, Corp 4lie Serving Florida since 1995 '-'-'-;:t.-•:,_ • City of Miaini Irtt Ian Creek Bridge .................„ Beach --- •IMM.Milin, -.4 Indian Village Miami Beach: Fl. (105*0 Bay Drive) ia&Z,,-,s..-::‘,',-44-..-.17-1-''.`"'7'..:1-1...t.--•,. .•':-..- ''.-I• •."':1 i!'".••.•-' - -• ....-- -• - "'" --•- ' - -:-- • • ., ''''41 '.1'4',.12-'-.L4tt'..•:-••••'''''''-.'.7 -...-- .-,""}"-„rr,%..'"...... •-". I....-. :. . , _ , - - •-.. - - - . -. . ..- .•• 'r.";11.'ri ..7.0.,... ''' ' , '". : '''7."- :'..4.1ara-•','' .4 -71'-', eeti.-P's'-‘U'r/77,.... -_ -".4•347;21":::3-SZ-rj-&Z.--,nr.rtre.V...:T:...,e1. t,.-4---Z'i*'Zill'z'r-'2.... ..-::-.-t-- .:-4,--:. .--.--.. ._ • :-..- - --.--: Aii: „ ;;I::--,,,_••t;,-*,•,- .-F.-.-:-,.,„*..,.'11-,is-,,,--W --7,...:•r-..,-;--P;.''';'7` .. ---•••- ---''•':.- ''':'':7'- -' ''' • ' . - - - ' -* .°.‘,3''•:1--C31@:,';''' .... - .- ''''r':.:;••••••1 1--Ze4 A"...-:‘i- i.!Z•.:--,,,..,:":- f,.4-,-,;,--- .., :,._ .-" • -...- ,.,. . , 7,,,,,t.V.157,71 7-4-4 ,,g;;;44. edri.=-:;-;•:f4i4774- ',.'''--..277-:•:;•:!,._-;--, -., -; '- "..- _-- ' . • •-r'.* , . ',,, ' 4-4.,4E-- •'.'-'441_,V1"-..-,';7',.-;:i.i,-4,.- -4.11-W,.'t-ih.t',5:--, ;,- -1-•;.- -,--,,,---:...'"--1,..''_:- . f2. ,_ -.;•-•:---- -----' •-.-%. Via .._...-- ...t.o..:.4;U:.-,2d.,__,''''"Z.V....••-tetn-'4--__._„'Slt. . .-.=4,4-"V,:'...-f-" ---1-1.'-'-,-;::,.-•-:=---•--...." •r 4'--.:1. - -'‘ .---..;• -7.: ;-.,..:•••,',, ....e • ' :::;".141•4,;.ii,'"9-- -4. •- -:'174----,----M-..---7',3-, -r,...tuz.-tkr..1.-..2-7.Xf is-c,.:-,-":"'""--i•-,--. ''' '44-: ---; • ''. ---- •-__:_•. ..,,•:- • -.•F•_-•'it•'.. ,,1".. ."- • -,-. '- . • --z' ''''''.4. -.----. ---; :.. --1-1. -_-g: '; .s-- • -'.:-...."- -:-.,;:".-•-. ---. :--77 ;.. . = ,--' -. ,3, -•C,:i•A,, 7.--:s,,,, ---..::!--,--.1.7-:::--.. ?r_r---::"..7.:.:, '•-. !...,,---.:?-,::,..-..-!:-,_;-'..._-..- --.-1, ,,.. .,i ..: ,..,, ;i It..,...I- .--...4_3_,...7,..-.&.-,- . - 1--,...----,-,,,,-.-- - ...,.. ..,-. _ -.4-_- , NI ' • ..-vq,pz,i t.....-,i4k.,--4,1?1..,...._?4 :.., . ...1... .....19 .-..r ..-;..- !r -..-a •i , ..., ' r 14.1g. , ,w.r.Iti;:tr:;••,:-_-^k>e „.LL..11..7.„.. -',4,-4.,,I,•.'v;4',,-; .:•,..-•,..., ,... ,.-., ..,.. t • . • ,..t. '.1'-v:18.., .. It,.'..At•t... .i.Y.',:" .‘‘„_-.`,,istit' .,‘Z",.4,44k..",i,,W,,,,,,,Z i,d.:er t'. . . . •.:. 'Ire , ,,•.3.tv.?4,--_,A 1-.•.sp.•-m.„ti--,..-1, ,..01„*.r774 r-,...-!.,,r.__'''', ,,,,-,•-", ,..1;.. ,- r,L,.L,.64-','...i ' :;',-1:-.'.;'. .-1-V-R--.`-.-' ,-...!.-..'-.''- .; t-, ;.••1;',,. ,t,.• . .. • „:." '--.7'!-.•.!,;.-:`" 4'-"' -'44.'"i.. ...-_. _,' ,.... .,.''t., ,;. ,...-',.' _.,.., j...,.,t„;.,,.,- , . ... . • ..: -,.' ..4.,--•`,. , : .46-0 ttii"----t--4.,,,-..,,, rtt:.;.•.;..-f.t),-.1. ...,..;1_17,4-,...,„..-,-g..!;„.,,-.,!, '14 ._ -t-1,'3q,"r•ikki!k.495--- .4t-1- 4.1)'"'''.4-i';';2;:<•-L:-. • I': '-',7° ,''n'4; .--41;,1.-rAl,,,-.`:.,V'.414`•ilitq,:•0•,,z4lEr':C:s• ' ; 2i,v..---;,?,;...,• '-_-. . ''-.,.' %-b•'.tr•'- ,-114 '"',:.: ."rrn„,.•fz-tfir;g,-,:.z.-.:etZitl!....t-.SR"?.":75-1- ::-YY:.•k2:-,•'. -_r,i-L. - :;-:-,... ,.,-.- -.. — ' '1'1X /r —• -4';';',....,--t,r,4-4•,.. .z.,4a., -;V. v4,, -e." ,,•-.1''..--"---,. .;,,, -1. -C.- • .:'4,. ,,-4 4....;'''''ry;,-.. ir-:',,---,..-legicri4.4,,,..,44 4eN,- .,.-1,W-P-1,,.4",:_s_P-r-1•.‘,7•';',..1. - - - :.. '').1.-.."'.. - '4,. -..--- z-------- -----44-1.---,..;:,.,--;--f}.--,;•,---, Underneath Bridge work _ . --,;i.i., ,•.... ,,,,:, c7i1-0.1.4,--,4,;:-' ...,•z•Yq, 4 rt, It'-.,u.v.;:-,...,ja•-•''r•.-1', .4td.it t.1 -,,. . . . , . I-. ,, ,y . b;'• r - i•''''-• ,tr 2, , -14'I;•'. • --•-.1,' .1,43.--.',411>t, '4%, .''' :' C ri .....4' -i,f.,,,4,4-,,...„,,..z.r„ , •!4,-,,,,54t„. .. - .. . .• ,..=_IR,„v-4,•:-,',,,,-,,7-N4it •..1,..v:..,- .- ._ • i. :. • . - . . • . . IMIESAM04 6,'• - ritI,-p-C' , k - 1,,,,T.i',1''...r- -• • . .,, CONSTRUTION,INC ;',4 .1!" . '4'. .. Ir.4- r: '."' - --- • ' • . ' '• 7215 NM. 7th. Street :" -fp.AV.A*4•,.,"1.'.- ' V _ ... - -.--.< --..-- - , milarni, FL 33126 0,c'el744-^WW, ' ts . • _ , ...,`•,I,Z i'711.Ol-‘..''..-4,-^- '--"'....;...----.:.t1:: : -4,. I rh Mr.Wili'zins Adana - -,-,.- -1;.-,----.. t:f.:, _ _ ._ .1 floaze: .Fax Safety First! -%. • - ------ --. ! I. •,-,, Luglatag -DL -ea,--.1=o-. --- - , Alt OSHA . ' 74-t•--.7.4...--t: , , - , :,..? • 1 f Certified Staff i -, L -. /-fi,m‘rN;5• •-e,st.-.,-„,-.,-,,,,,, !,,h. ----------, ' ,• -4*.4,44-=,...."--;‘:,-r-,'W -- -.... - ,_ •,4 Services Provided Include: 1;3V2' -:---,-:. - t----... .•..--- .. i .,."''''''', -..--.-'"-cP<. ' • VA, • Maintenance and decontamination .: • .- ::•.-.-• ', . 4 Custom Painting Installations .::;5.s.— ..,-• -;•. '..- .. • • 1 r.: , .•• --=, --:_....,..,:•--:......---4., •,. • . !..', .•,. .-...1..„as.„..4_,,...„- . • ''..; 4 Joint Demolition and restoration ,...TiF-.. . .. •-:, 4 Concrete Rehabilitation -,.... ..." . ...1. i.: 4 New Installations ,,..e , • '..,. . • :„. ,:''.-- :eil ..' .-,. ., • • ,) 4 Applied Sealants • 1;r::-=•ke-q •• --- • 12252 SW 128 Street Miami,FL 33126 Office:(786)293-7428 Fax:(786)293-7430 r • • i, '.1 1.. INFO C)INCLANPA1NTING.NET f ,. . MI A M I BEACH CA _ mar Www.Inclaapainting.net Complete Expansion , • Joint rehalmhtaton , •3 at - _ . • , , Mi Inclan Painting and Waterproofing, Corp. Serving Florida since 1996 Major Projects Completed Project 1. • a: Project Name:Refurbishment of Dolphin and Flamingo Garage b. Owner:Miami International Airport c. Architect EAC Consulting,Inc. d. General Contractor:MCM Munilla Construction Management e. GC Contact Name&Phone Number Project Manager-Johnny Peterson PH:305-541-0000 Ext 246 f. Final Contract Amount:$429,576.67 • g. Percentage completed(your scope): 100% h. Percentage of Subcontracted work:not applicable i. Scheduled.Completion Date:December 2016 j. Type of Work:Maintenance Including Painting and Waterproofing,protective coatings. yF Project 2. fE s' a. Project Name: Santa Clara Elementary Renovation . b. Owner:MDCPS c. Architect Ferguson, GlasGow,Schuster,Soto,Inc. d. General Contractor ICI International,Inc. e. GC Contact Name&Phone Number Michael Oliveira DL(786)252-2940 • £ Contract Amount: $129,245.00 g. Percentage completed(your scope):90% tr h. Percentage of Subcontracted work:not applicable i. Scheduled Completion Date:January 2017 a i 12252 SW 128 Street Miami,FL 33126 • Office: (786)293-7428 Fax: (786)293-7430 INFO@ INCLANPAINTING.NET Www.Incla.npainting net f I• w `-s= Incian Painting and Waterproofing, Corp. �R -'''';---::.--,-.S.;* ; , „ ,-045, Serving Florida since 1995 r Protect 3. . a. Project Name:Jack D.Gordon Renovations - ,y, b. Owner:MDCPS c. Architect:Javier E.Cordova,AIA,LEED AP d. General Contractor: J.R.T.Construction,Co. ,1 e. GC Contact Name&Phone Number Carlos R.Tarafa Cell:305-975-6744. ! '-.s f Contract Amount $203,435.00 .: g. Scheduled Completion Date:March 2017 y i' t ' z : Project 4. a. Project Name:Coral Gables Parking Garages#2&#6 Mr b. Owner City of Coral Gables . - "` c. Architect unavailable d. General Contractor: FL. Construction&Engineering,Inc. , c e. GC Contact Name&Phone Number:Owner Mr.Hamid(305) 883-7601 ' 04' f. Contract Amount:$275,000.00 , Date of completed:May,2016 �a g• p Y .- h. Type of Work:Painting and Waterproofing,maintenance and rehabilitation of public r ;: G1. arages. �' Project 5. ' ^;i a. Project Name:MDAD 7040 Work Order based Pilot Program for Emergency/Priority 4' Maintenance fi b. Owner: Miami Dade Aviation Department '-, c. Architect unavailable d. General Contractor Direct with MDAD {' e. GC Contact Name&Phone Number:Project Manager-Ralph Cutie Cell:(786)516-3880 f Contract Amount:$200,000.00 >, g. Date of completed:June 21,2016(Original Completion date Dec.2015/Revised Jan.2016) 3,7,• .1 12252 SW 128 Street Miami,FL 33126 Office:(786)293-7428 Fax: (786)2934430 INFO@ INCLANPAINTING.NET Www.Inclanpainting.net 1 1 , , r:," _ .. ...-1 ~ - rt '-' Inclan Painting and Waterproofing, Corp. ,, t !- r. Serving Florida since 1896 �` ?. ,ter'.arm' I fi Project 6. a. Project Name:Maya Angelou School Renovations 4 b. Owner:MDCPS c. Architect:Ferguson,GlasGow, Schuster,Soto,Inc. 3 d. General Contractor:JCI International,Inc. e. GC Contact Name&Phone Number:Michael Oliveira DL(786)252-2940 1 f. Contract Amount:$114,000.00 g. Percentage of Subcontracted work:not applicable h. Scheduled Completion Date:February 2017 y • Project 7. a. Project Name:Multiple Parks North of Tamiami:Trail — `'' b. Owner:MDC Parks and Recreations c. Architect:N/A d. Contact Name&Phone Number:Dean Gaffney(305)596-4460 Ext.282 hi e. Contract Amount $50,000.00 `y p f Scheduled Completion Date:August,2014 Project 8 . r• a. Project Name: Crandon Park Tennis Stadium b. Owner:MDC Parks and Recreations c. Architect N/A d. Contact Name&Phone Number:Dean Gaffney(305)596-4460 Ext.282. t e. Contract Amount: $105,000.00 f Scheduled Completion Date:March,2016 1.1 12252 SW 128 Street Miami,FL.33126 Office:(786)293-7428 Fax:(786)293-7430 s INFO®INCLANPAINTING.NET Www.Inclanpainting.net 1• , aY j .i i- f_ ,' ..•`.. Y Inclan Painting and Waterproofing, Corp. � , -. Serving Florida since 1996 a 1 t' Project 9: a. Project Name:Traffic Directional Paint In Parking Lots • b. Owner.Miami Dade College-Kendall Campus c. Architect:Not applicable—On site evaluation •. d. General Contractor J.R.T.Construction,Co. e. GC Contact Name&Phone Number Robert Tarafa Sr.Tel: 305-557-9911 f. Contract Amount:$22,350.00 1 g. Scheduled Completion Date:December,2016 zu Project 10. a. Project Name:Various Fire Stations—Throughout Miami-Dade b. Owner:MDFRD c. Architect:N/A . ,,t; d. Contact Name&Phone Number:Mr.Alberto Aleman(786)331-4516 "' e. Contract Amount$79,500.00 C f. Scheduled Completion Date:July,2016 Project 11. A. Project Name: Florida International University j —Interior Renovations for Turner B. Owner.FIU • C C. Architect:Alleguez Architecture.Inc. D. Contact Name&Phone Number:Ms.Shivangi Desai,(305)479-1101 i E. Contract Amount: $20,350.00 • F. Scheduled Completion Date: October,2016 •ii. • r; 1 ; 12252 SW 128 Street Miami,FL 33126 . Office: (786)293-7428 Fax:(786)293-7430 • INFO®INCLANPAINTING.NET Www.Inclanpainting.net r I' _ r ■:.1 • a ' a Inclan Painting.and Waterproofing, Corp. - Serving Florida since 1995 . S.,.:__ . Project 12: A. Project Name:Neva King Cooper EC,Homestead,Fl. B. Owner:MDCPS C. KVH Architects,PA-Turner Construction,Corp. D. Contract Amount$157,423.00 E. Subcontracted:N/A FiF. 98%completed . , PiG. Scheduled completion Date:August 2018 , Corey Beaie( Procurement Agent SPD Turner Construction Company ( 7235'Coi orate.Center Drive.Suite;:G 1 Miami.FL 33126 P direct 786.621.9000 I mobile 305.519.2901 I CBealei tcco.com website f linkedin I facebook.I twitter I youtube I. pinterest • ,_.., p Project 13: A. Project Name:Pincrest Villas,TRT • B. Pascual,Perez,Kiliddjiam and Associates . C. Contract Amount$62,000.00. 0.E4 D. Subcontracted:N/A . iE. Scheduled Completion Date:May 2017 • I:• Eq 01, r ii • y • di v, . r 12252 SW 128 Street Miami,FL 33126 Office:(786)293-7428 Fax (786)2934430 INFO@ INCLANPAINTING.NET •`' Www.Inclanpainttne.net . ,:s.. _ ., . .. _ �� APPENDIX A Price Form, Bid Tender Form,-& Supplements ATTACHMENT A-1: ITB Price Form& Unit Price Breakdown form ATTACHMENT A-2: Bid Tender Form ATTACHMENT A-3: Supplement to Bid Tender Form: Contractor Qualification Statement ATTACHMENT A-4: Supplement to Bid Tender Form: Non-Collusion Certificate ATTACHMENT A-5: Supplement to Bid Tender Form: Drug Free Workplace Certification ATTACHMENT A-6: Supplement to Bid Tender Form: Equal Benefits Ordinance ATTACHMENT A-7: Supplement to Bid Tender Form: Trench Safety Act ATTACHMENT A-8: Supplement to Bid Tender Form: Recycled Content Information Fai arethe attached ITB Price Form shalt render proposar non-responsive, and sarvir ojjk gip ve=proposatshoIt not be considered by the City_. • • BID NO:2018-232-ZD CITYOF MIAMI BEACH MIAMI 53 A-2 City of Miami Beach,Florida 1700 Convention Center Drive Miami Beach, Florida 33139 The undersigned, as Bidder, hereby declares that the only persons interested in this bid as principal are named herein and that no person other than herein mentioned has any interest in • this bid or in the Contract to be entered into; that this bid is made without connection with any other person, firm, or parties making a bid; and that it is, in all respects, made fairly and in good faith without collusion or fraud. The Bidder further declares that it has examined the site of the Work and informed itself fully of all conditions pertaining to the place where the Work is to be done; that it has examined the • Contract Documents and all addenda thereto furnished before the opening of the bids, as acknowledged beiow; and that it has satisfied itself about the Work to be performed; and all other required information with the bid; and that this bid is submitted voluntarily and willingly. • The Bidder agrees, if this bid is accepted, to contract with the City, a political subdivision of the State of Florida, pursuant to the terms and conditions of the Contract Documents(and to furnish all necessary materials, equipment, machinery, tools,'apparatus, means of transportation, and all labor necessary to construct and complete within the time limits specified the Work covered by the Contract Documents for the Project.entitled: INVITATION TO BID(ITB) No. 2018-232-ZD Waterproofing—Traffic Coating Services for Parking Garage Decks at the 12th, 16th,17th Street, and 1 755 Meridian Avenue Garages(Individual Projects) The Bidder also agrees to furnish the required Performance Bond and Payment Bond or alternative form of security, if permitted by the City, eachfor not less than thetotal bid price plus alternates, if any, provided in the ITS Price Form in Section 00408 and to furnish the required Certificate(s) of Insurance. In the event of arithmetical errors betweenrthe division totals and the total base bid in the ITB Price Form, the Bidder agrees that the total base bid shall govern. In the event of a discrepancy between the numerical total base bid and the written total base bid, the written total base bid , shall govern. in absence of totals submitted for any division cost, the City shall interpret as no bid for the division, which may disqualify bidder. ' BID NO:2018-23220 CITYOF MIAMI BEACH '�lAM BEACH 58 ' 1 , A-2 Acknowledgment is hereby made of the following addenda (identified by number) received since issuance of this Solicitation: bbe�y" 'rT'•" r.•�- -�r�''r�Ciix-r""�r...t^tFr •' .t.— .-.3-.,,.ac rYF ;--.t ,�.-�.p•+ l -aeY .�"�{� � }.�riff�' '^�;"F�-ra�� � at�,e-•t �"'• ^i, ,�S i 'r. Amendment 1 $l 2 / l ; Amendment 6 Yp a Amendment 2 Amendment 7 10_( Arrendmc••nt 3 Amendment 8 . Amendment 4 Amendment 9 Amendment 5 't �� 9 11 Amendment 10 . Attached I,• a Bid Bond ❑, Cash ❑, Money Order 0, Unconditional Letter of Credit:❑;: : Treasurer's Check 0, Bank Draft 0, Cashier's Check ❑, or Certified Check 0 No. • • Bank of , for the. sum, of Dollars ($ r, ). The Bidder shall acknowledge this-bid by signing and completing the spaces provided bellow. Name of Bidder -Lc 2-(DA Cot)S1L0Cr1oc:i i✓ En) rN& 1'NC Address Pirie 1: I, SS . .Seo r-LEy _ �2. . Address Line 2: Nllj,A' 5 -I'J GS TF1-- .3-S 16 6. Telephony: Number: —305 r 60 E=mail Address: -cc.e. Sly .)14 knOa eD ,;,, . . Soca! Security Number: . N b . — � .70k).14.,- , Y -; 110. urea er• Ski ^�t to gt3 C7 Dun Bradstreet No:•. ..., 4�,tt f'v..•Jwea if a partnership, names and addresses of partners: (Siga.below if not incorporated) • WITNESSES: (Type or Print Name of Bidder) (Signature)' ,-� (Type or Print.Name Signed Above) � iif,�ii'��� ' CITYOF MIAMI BEACH t 1 ::: .a�n0o:2ois-?32••zla 59. BEACH :`:�`; ..: (Sign below if incorporated) DA Co IJ Si72 v ---.o,.1 : EN.161,v--.€.a t raG kw_ ATTEST: (Type or Print Name of Corporation) e retary /71 2. 9 � — PR.Esi.ro v i ignature and i e (CORPORATE SEAL) (Type.or Print Name Signed Above) Incorpoiated under the laws of the State of: FL-v x',011. •• • BID NO:2018-232-Z0 CITYOF MIAMI BEACH 'AA r, t C-- A-3 • -SUPPLEME ➢T TO BID/TENDER FORM: CONTRACTOR QUALIFICATION STATEMENT THIS COMPLETED FORM SHOULD BE SUBMITTED WITH THE BID; HOWEVER, ANY ADDITIONAL INFORMATION NOT INCLUDED IN THE SUBMITTED. FORM AS DETERMINED IN THE SOLE DISCRETION OF THE CITY; SHALL BE SUBMITTED WITHIN TWO(2) BUSINESS DAYS OF THE CITYS REQUEST. • The undersigned. euthorized representative of the Bidder certifies the truth and accuracy of all ` statements and yle answers contained herein. • 1. Please list all Licenses, Certifications, and/or Registrations your organization may possess. Please also indicate the number of years your organization has been in possession of these licenses, certifications; and/or registrations. - LicenseiCertiiication#/Registration# #Years ^.c?C 0384:8 31 sac 024 18 2. ,Attach list of the Key Personnel, the intended role for this Project, and resumes for each individual. See AtlWi1 d �* si your °; Cer:to ctien 3. i111'f'1a�t r.;ler:{:e R� arFt��I,,;;i1 t. 4. Please indicate the last project of similar scope and volume that your organization has completed and its completion date. Cit1;,t Coral Gables:repair and Rehabilitation of Parking garage#2 and#6 Completion 2018 5. Have you ever failed to complete any work awarded to you? If so,where and why? • 6. list cw ner names,:addresses•and telephone numbers, and surety and project names,for all protects for which you have performed work, where your surety has intervened to assist in completion of the project,whether or not a claim was.made. N/A 7. Rert*pF;><i:c 'e ,fr, Pct P:rr"n;rri a,!ce. Bidder shall submit at least three (3) references for whom the proposer has completed work similar in size and nature as the work referenced in solicitation. See attached SUB'' ITTAL REQUIREMENT: Proposer shall submit a minimum of three (3) references, • including the following information: 1) Firm Name,; 2) Contact Individual Name & Title, 3) °;ddi ers, }) Telephone, 5) Contact's Email and 6)Narrative on Scope of Services Provided. • • I ' BID NO:2018.23a-7D / Ci1YOF MIAMI BEACH ` BEACH VST--c: HAMID REZA DJAHANSHAIII . 61 Deer Run , N. • . Miami Springs,FL 33166 (786).271-0656' • EDUCATION Bachelor of Science in Civil Engineering. Ohio State University,Columbus, Ohio(December 1982) Areas of concentration include Structural and Construction;Engineering Bachelor of Science in Mining-Engineering. Ohio State University,Columbus,Ohio(June 1982) Relevant.Coursework includes: • , Structural Engineering Principles Structural Analysis . Basic Reinforcement Concrete Design Principles of Rock Mechanics Designof Steel Structures Geotechnical Engineering Wood Structure Design Cost Analysis PROFESSIONAL BACKGROUND . ,•General Construction Contractor,Florida Construction&Engineering;Inc.Miami Springs,FL (1987 to present) -Responsibilities included oversight of all aspects of assigned projects. Design and Construction Engineer,A&M International,Inc.,Rockville,MD. (Jan 1983 to 1987) -Responsibilities included analysis and design of low—to;mid-high rise residential,institutional and office building of both steel and concrete material Research assistant.The Ohio(State Department of Civil Engineering,Hydrology Laboratory, Columbus,Ohio (Jan 1981 to April 1981) . -Responsibilities included collecting geomorphic data for,a U.S.Geological Department sponsored . . project in Ohio River Basin. Resident Manager,Hill's Apartments,Columbus,Ohio (June 1979 to Jan 1981) 1 • Research Assistant,The Ohio State University,Department of Civil Engineering,Division of Materials and Design, Columbus, Ohio(March 1979 to Sept 1980) -Responsibilities included preparing and testing samples for two research projects: A Statewide Study of SubgTade Soil Support Conditions and Optimization of Design of Asphalt Paving Mixtures. Maintenance and Repair Assistant, Ohio Dominican College,Columbus,Ohio(June 1978 to Sept • 1978) . PROFESSIONAL AFFILIATIONS . • Miami Sprues Rotary Club . American Society of Civil Engineers(ASCE) American Society of Mining Engineers (ASME) . .• HONORS/AWARDS ' . Recipient of Engineer in.Training(ETT) certificate from state of Ohio ' Chi Epsilcin,National Honorary Society for Engineers , Achieved a 3.0/4.0 Cumulative Grade Point Average,The Ohio State University , Recipient of the Mining Engineering Department Scholarship,The Ohio State University References Available upon Request 1Pa • • • MAE IIOUD REZA D'JAIIANSHARI 61 Deer Run Miami Springs,FL 33166 (561)747-9382 • EDUCATION: Bachelor of Science in Civil' Engineering,The Ohio State,University, Columbus,Ohio, 1978 • PROFESSIONAL EXPERIENCE: 1999—Present Florida Construction&Engineering Inc. Miami,Florida Construction Site Manager—Responsibilities included review of schedules coordination among the various disciplines,resolution of daily design and construction obstacles.Performed as a liaison between Inspectors and other . • trades and disciplines. Studied ail contracts to ensure jobs performed are in accordance with the scope of work and do not exceed the project budgets; 1992—1999 Techno Electric Inc. North Palm Beach,Florida . Owner/Manager—My Spouse and I are sole operators and decision makers of • the company.We are committed to all aspect of desiga and construction which includes estimating,bidding,financing,scheduling,marketing,job supervision, advertising,purchasing,invoicing, drafting and calculation. 1981-1991 Bechtel Power Corporation. Gaithersburg,Maryland Civil/Structural Design Engineer-Responsibilities included analysis and design • . of steel and reinforced concrete structures. Performed calculation on frames,floor systems,platforms and retaining wall of power generating plant to assure compliance with AISC,AISI,ACI and AWS. Checked Architectural drawings for accuracy. Job Site Experience: Assigned to construction site to resolve structural design related problems. Interfaced with other disciplines and construction management for the .' • expeditious resolution of problems do meet the project schedule. 1980—1981 Great Lakes Supply Co. Cleveland,Ohio Structural Design Engineer-As the Only engineer had total responsibility for designing and drawing industrial and construction material handling device manufactured by this company.Other duties included testing and inspection subject equipment. • • . I., • II 1979—1980 Paramont Technical service. Cleveland,Ohio Structural Design Engineer—Duties included structural analysis,design and • modification of heat furnaces at Union Carbide Corporation,Metal Division, • Ashtabula,Ohio. 1975—1979 ' Department of Civil Engineering,The Ohio State University. Columbus,Ohio Research assistant—Duties included research and studies on construction materials with an emphasis,on asphalt and concrete mix design.Additional • responsibilities were testing and defining strengio of various materials. • REGISTRATION:. EIT certificate, State of Ohio PROFESSIONAL . • AFFILIATIONS: American Society of Civil Engineers(ASCE) • REFERENCES: Available upon request. • • • • .• • • • li• Roya Kathryn Arabi 8195 Copenhagen Way Boca Raton, F133434 561-218-8782 or Cell 561-306-5753 E-mail:rovaarabi@vahoo.com • SUMMARY OF QUALIFICATIONS Highly organized and detail-oriented accountant with Over 10 years of upper level experience. > Proficient with Microsoft Windows, Excel and Word. > Extensive experience with QuickBooks and Peachtree Accounting Software. • EMPLOYMENT May 20072 - Florfda Construction &Engineering,;lnc..Miami Springs,Florida. Present Accountant. Tasks include: Oversee payroll, account payable,and account receivable functions. Generation of Pay requisitions for current/pendingjobs. Participate in the compliling of Bid Packages. Completion of all month-end reporting, • May 2001 - ArabiBusiness Solutions,Inc.Boca Raton, Florida. Present Owner/Accountant. Tasks include:Automation of accounting processes, extensive. • account reconciliations, completion of month=end reporting, multiple audit projects, generation of proforrnas and budget analysis for operations and business plans,payroll processing and tax preparation. Feb 1999- Chalk's Ocean Airways.Ft.Lauderdale,Florida. Jan 2002 Controller. Responsible for cash management,A/R and A/P processes,prepared all month-end financials,preparation of all documentation for CPA's audited financials • and annual tax:returns, monthly and quarterly tax reporting,periodic budget projection formulation and analysis. Sep 1998- Gulfstream International Airlines,Inc.Ft.Lauderdale, Florida. Jun 1999 Assistant to the CFO. Duties included financial analysis and budgeting, reconciliation duties for month-end reporting, 401(k)-benefit management and assistance in cash management of the A/P process. Jan 1997- Gator Leasing,Inc.Miami, Florida. Sep 1998 Assistant Controller. Duties included biweekly payroll processing,personnel file and employee benefit maintenance, equipment licensing and management, assistance in month-end reporting,preformed allaccounting functions for a Gator subsidiary. • 1989—1996 Airways International,Inc.Miami,Florida. Staff Accountant. Maintaining files, Managing bank account records,providing inventory control, and assisting with personnel issues. Shared duties in the airline's reservation department, customer service, and flight.operations. EDUCATION •• 1994—1996 . Bachelor of Science,Accounting Bachelor of Science,International Business Florida State University, Tallahassee,'Florida 1991-1994 General Studies Florida International University,Miami, Florida .references available upon request .�V'vV! l 1 V 7 ISAIAS CARRANZA 17360 SW 232 ST LOT# 4 Goulds, FL 33170 / (786) 208-4907 / isaias8711@gmail.com EDUCATION: * South Dade High School EXPERIENCE: * All kind of construction work. * Operator of heavy Equipment. ' SKILLS: ✓ * Project Manager WORK HISTORY: * Construction REFERENCE: ` * South west trailers / (305) 257-5191 * Lemus / (305) 305-7157 LANGUAGE: *English *Spanish , Aa3 I 8. Attach a list including the following information concerning all contracts in progress as of the date of submission of this bid. (In case of co-venture, list the information for all co-venturers): See attached a. Name of Project • b. Owner and Point of Contact(Minimum of Phone Number&E-mail Address) c. Original Contract Value d. Current Contract Value e. Projected Date of Cornpfetion per Contract f. ;Percent (%)Completion to Date of Bid Submittal 9. Has a representative of the Bidder completely inspected the proposed project and does the Bidder have a complete plan for its performance? I 1 Yes ©No 10. State the true, exact, correct and complete name of the partnership, corporation or trade name under which you do business and the address of the place of business. (If a corporation,state the name of the president and secretary. If a partnership,state the names of all partners. if a trade name, state the names of the individuals who do business under the trade name). Additional Sheets may be attached as necessary. A. The correct name of the Bidder is: Florida Const.cticn, Fnyinosrog,Inc. B. The business is a: 0 Sole Props Eawsship G Partnership n Corporation C. The address of principal place of business is: 135 Bensley Drive Miami Springs,FL 33166 • D. The names of the corporate officers, or partners, or individuals doing business under a • trade name, are as'Wows. j . �J1R 4 Ry"1 Y: E rr 'i`1l t�°IS•t F.F ' • _ ' w�',+ ��' +�fi tgn�,iPl�`IJ7n ��t -R i f fr ,C •• -- ' C'.' !:rC:�'�"TN+ rr 'n.+.,. *s:..s-�v...w. .1 0 Hamid Reza Dj.ahanshahi president,Secretary Mahmoud Reza Djahanshahi Vice President H i - • r BID NO:2018-232-ZD [:ti{u4� f3161iB3i r3i:AC 62 �iL1�C'i • FC&E i • • v Ike • • FLORIDA CONSTRUCTIONt., ENGINEERING, INC. 155 Bealley Drive P.O. Box 1426 • Miami Springs,FL 33266-1426 Ph: (305) 883-7601,Fax: (305) 883-1514 • Dear Prospective Client: We appreciate this opportunity to send our,Florida Construction&Engineering,Inc.,corporate • resume, for your review and subsequent use in selection of a qualified general contractor for:any of your construction requirements.FC&E is celebrating.thirty two years in business in South • Florida and we wish to extend our capabilities to you on your important projects. Our accomplishments as a General Contractor in Residential as well as Commercial are outlined in the partial list of projects enclosed.Although our corporate office is based in Miami,our operational area encompasses the entire State of Florida..Asa General Contractor and Construction Managers,our experience and mobility allows us to efficiently serve a wide and diverse territory on behalf of our clientele. `FP Throughout the years.FC&E has accumulated an assortment of projects,with contracts exceeding millions of dollars.FC&E has always delivered its projects on time and within the budgets set out in their contracts. Than?c you for taking the time to read this important document of our performance during our last Twenty eight years of business.We look forward to hearing from you in the near future to discuss • our involvement in your plans and on your important projects. Respectfully, • •Hamid R. Djahanshall,i President • Reference 1: Owner/Entity: City of Coral Gables-Department of Public Works Contact Name&Title: David Galeano, Civil Engineer , • • Address: 2800 SW 72nd Avenue Miami Fl 33155 Telephone:305-460-5017 Email:dealeano@coraleable.com Narrative: Scope of Work for Parking Garage#6—Merrick Place:This project is located at 51 Aragon Avenue, Coral Gables, Florida 33134.The scope of work is limited to specific areas of existing facility;an overall synopsis of the scope is as denoted below.The managing general contractor is to become familiar with the overall scope described and illustrated in these documents.The contractor is to visit the facility and verify existing conditions. • 1. Egress stairs 1 and 2 including all associated vestibules. a. Lighting enhancements by replacing the existing light fixtures to LED type; b.All interior walls are to receive new paint as specified;c.AiI interior floor surfaces are receiving new sealer; d.All entry doors, hardware and frames are to be replaced. New assemblies are to meet existing fire ratings;e. New finish on egress stairs hand and guard rails. 2. Elevator waiting areas (all levels) a. Lighting enhancements by replacing the existing light fixtures to LED type; b. New LED lights at waiting areas;c.All interior walls to receive new paint;d.All waiting area floor surfaces are to receive appropriate sealer;e.Al!entry doors, hardware and frames are to be • replace with assemblies that meet existing fire ratings;f. New Finish on all ingress/egress stair hand and guard railings; 3. Parking Garage(all levels) a.All interior walls and ceilings are to receive new paint; 4.Service area ( Ground Level)a.Walls and Ceilings are to receive new paint;b.All Entry Doors, • hardware end frames are to be replaced, new assemblies are to meet existing fire ratings;c.All Floor surfaces are to be repaired and replaced. Scope of Work for Parking Garage#2—Museum Garage This project is located at 220 Aragon Avenue,Coral Gables, Florida 33134.The scope Of work is limited to specific areas of the existing facility; an overall synopsis of the scope is as,denoted below.1. Egress stairs 1,2 and 3 including all associated vestibules as well as all elevator lobbies. a.Lighting enhancements by replacing the existing light fixtures to LED type; b.All interior walls are to receive new paint as specified;c.All interior floor surfaces are receiving new sealer; d.All entry doors, hardware - and frames are to be replaced. New assemblies are to meet existing fire ratings;e. New finish on egress stairs hand and guard rails. • 2. Parking Garage(all levels)a.All interior walls and ceilings are to receive new paint; b.New vehicular traffic coating on all ramps above any retail spaces,ramps from ground level to 2nd level. 3. East Paseo and service area ( Ground level) a.Walls and Ceilings are to receive new paint;b.All Entry Doors, hardware and frames are to be replaced, new assemblies are to meet existing ratings;c. Lighting enhancements of existing area by replacing the light fixtures with LED type. Reference 2 • Owner/Entity: Miami Dade County Port Miami Contact Name&Title: Frank Ramirez, Program Management Consultant Address: 1007 N.America Way, SUITE 311 Telephone: 305-347-5508 • Email: rfrank@miamidade.gov Narrative: Multiphase improvement project to upgrade existing utility infrastructure and pavement for approximately 8 acres to improve the efficiency of cargo operations. The area within this phase of the project will primarily be used fors heavy equipment and container storage. In addition,the improvements in this phase will consist of the following,but are not limited to: installation of new high mast lighting, electrical conduits;utility adjustments,improvements to pavement and the existing drainage, water and sewer systems, and earthwork related operations. Size of Job totaling$ 5,061,850. Referenze 3 Owner/Entity: Miami Dade Fire Rescue Department • Contact Nan.e&Title: Edward Villareal—Project manager Address: 9300 N.W 41'Street Telephone:786-331-5000 Email: Edward.villareal@miamidade.gov Narrative: Million Dollar renovation of Firehouse to Code and'Historic preservation. CONTRACTOR: FLORIDA CONSTRUCTION& ENGINEERING, INC. CURRENT PROJECTS - OWNER DEPARTMENT JOB VALUE %Comp. Contact Contact# 1 Parking Garage 2&6 Waterproofing&Door Install CITY OF CORAL GABLES $ 1,405,810.16 98% ERNESTO PINO (305)460-5000 2 Colonial Drive Park Remove Contaminated Material&Build Baseball Park MD Parks&Rec $ 1,689,745.66 93% DUANE KOPP (305)755-7954 3 TDSOR Road Improvements Southwest Ranches-Broward $ 620,202.20 100% EMILY McCORD (954)343-7453 4 MIA Ticket Counter G-H Interior renovation of ticket counter areas _MD-AVIAITION $ 1,716,536.00 100% ALEX MONTALVO (305)876-7513 A-3 • E. List all organizations which were predecessors to Bidder or in which the principals or officers of the Bidder were principals or officers. Bentley Investors • F. List and describe ail bankruptcy petitions (voluntary or involuntary) which have been filed by or against the Bidder, its parent or subsidiaries or predecessor organizations during the past five (5) years. Include in the description the disposition of each such • petition. • N/A . • • G. List and describe all successful Performance or Payment Bond claims made to your surety(ies) during the last five (5) years. The list and descriptions should include claims against the bond of the Bidder and its predecessor organization(s). • N/A H. List all claims, arbitrations, administrative hearings and lawsuits brought by or against the Bidder or its predecessor organization(s) ;during the last five (5) years. The list shall include all case names; case, arbitration or hearing identification numbers; the name of the project over which the dispute arose; a description of the subject matter of the dispute; and the final outcome of the claim.; N/A I. List and describe all criminal proceedings or hearings concerning business related offenses in which the Bidder, its principals or officers or predecessor organization(s) were defendants. 'N/A • . • . BID NO:2016.232,ZDCITYOF MIAMI BEACH :BEACH 63 r. A_3 ' . J. Has the Bidder, its principals, officers or predecessor organization(s)been debarred or suspended from bidding by any government during the last five (5) years? If yes, please provide details. No. K. Under what conditions does the Bidder request Change Orders? When there is a unforseen condition that requires additional work or change in scope with monetary consequense • L. Provide the names of all individuals or entities (including your sub-consultants) with a controlling financial interest and the percentage of ownership. The term "controlling , financial interest" shall mean the ownership, directly or indirectly, of 10% or more of the outstanding capital stock in any corporation or a direct or indirect interest of 10%or more in a firm. The term 'firm" shall mean any corporation, partnership, business trust or any legal entity other than a natural person. N/A M. Individuals or entities (including our sub-consultants) with a controlling financial interest: have x have not contributed to the campaign either directly or indirectly, of a candidate who has been elected to the office of Mayor or.City Commissioner for the City of Miami Beach. Please provide the name(s) and date(s) of said contributions and to whom said contribution was made. N. Has the Corporation, Officersof the Corporation, Principal Stockholders, Principals of the Partnership or Owner of Sole Proprietorship ever been indicted, 'debarred, disqualified or suspended from performing work for the Federal Government or any State or Local Government or subdivision or agency thereof? DYes allo 0. Are any indictments, debarments, disqualifications, or suspensions referenced on the • previous pale current? rarA DYes D o If the 017:si ger to either number N or 0 is yes, attach a written detailed e: i:,,anation. BID NO:2018-232-ZR,: CITYOIF MIAMI BEACH ':BEACH 1A4 1 • • P. Is the business entity owned by a certified service-disabled veteran, and or a small business owned and controlled by veterans, as defined on Section 502 of the Veteran Benefit Health, and Information Technology Act of 2006, and cited in the Database of Veteran-owned Business? DYes xDNo Q. Non-Discrimination. Pursuant to City OrdinanceNo.2016-3990, the City shall not enter - . • into a contract with a business unless.the business represents that it does not and will not engage in a boycott as defined in Section 2-375(a) of the City Code, including blacklisting: divesting from, or otherwise refusing to..deal with a person or entity when ,such action is based on race, color, national origin, religion, sex, intersexuality, gender identity,sexual orientation, marital or familial status,age or disability. • SUBMITTAL REQUIREMENT: No additional; submittal is required. By virtue of exxecuting this affidavit document, Proposer agrees it is and shall remain in full . compliance With Section 2-375 of the City of Miami Beach City Code. . 'R. Ni'wratcrium oil Travel 20 and the Purchase of Goods or Services from North Carolina • and ktissiesipii. Pursuant to Resolution 2016-29375, the City of Miami Beach, Florida, • . prohibits offcial City travel to the states of North Carolina and Mississippi, as well as • the, purchase of • goods or Services ;sourced in' North Carolina and Mitis eippi. Proposer shall agree that no travel shalt occur on behalf of the City to • • North Carolina or Mississippi, nor shall any product or services it provides to the�City be S ourced from these states., • • ® SUi;iMITTAL REQUIREMENT: No additional .submittal is required. By 'virtue, of '•executing.Alas affidavit document, Proposer agrees it' is and shall remain in full compliance with Resolution 2016-29375. • S. Fe sr Chane Requirement. Pursuant to Section 2-376 of the City Code, the City shall .. net ante;Trite any contract resulting from a competitive solicitation, unless the proposer . • • ;er`t es.i . writing that the business has adopted and employs written policies, practices, and standards that are consistent with the City's Fair Chance Ordinance, set '. fc r l.. in Articie 'a`of Chapter 62 of the City Code ("Fair Chance Ordinance°), and which, a.P0Py other things, (i).prod�i'bits City contractors, as an employer, from inquiring about , an applicante criminal history until the .applicant is given a conditional offer of • _ employment; (ii) prohibits advertising of employment positions with a statement that in • indivtduai with a criminal record may not apply for the.position, and (iii), prohibits • . placing a statement on an employment application that a person with a criminal record . . may not apply for the position. . . • 61ti tri CAL Y:EQU[Rl t'it r: No additional ;submittal is required at this time. By virtue of executing this affidavit, proposer poser certifies that it has adopted policies, • praciicssend standards consi stent with the City's Fair Chance Ordinance. Proposer tier .es to provide the.Cite viith supporting documentation evidencing its compliance • Upfin request. Proposer further agrees that any breach of the representations made . herein r+ s hw ll c e',.,-titute a rr:a`eriat breach of contract, and shall entitle the City to the _ irro iediate termination for cause of the agreement, in addition to any damages that • • may be available at law and in equity. • • • • • BID NO:2018-232-Zil CIVIC F MIAMI BEACH _? BEACH 65 I A-3 1 CONTRACTOR QUALIFICATION STATEMENT VALIDATION: The undersigned certifies that the information provided in this questionnaire is correct and accurate. • IF PARTNERSHIP: Signaiure Print Name of Firm Print Name Address Title: CONTINUED ON FOLLOWING PAGE IF CORPQRSTIQN: • Florida Construction&Engineering,Inc Signa‘ta , ! Print Name of Corporation Hunk' R.Djahanshahi 155 Bentley Drive Miami Springs Fl 33166 • Print Name Address Pre.sident WITNESS: .Sppliteire • - • Roya Arabi • Print Name Title:• LiCCOLIntant • • . . (CORPORATE SEAL) • Attest: /2. ... Secretapj---- • • — • • BID NO:2018-232-Z0 CITYOF MIAMI BEACH i BEACH • 66 A-4 SUPPLEMENT TO BID/TENDER FORM: NON-COLLUSION CERTIFICATE • THIS FORM MUST BE SUBMITTED PRIOR TO AWARD FOR BIDDER TO BE DEEMED • RESPONSIBLE. • Submitted this io day of 2 S , 20\`6. The undersigned, as Bidder, declares that the only persons interested in this Bid are named herein; that no other person has any interest in this Bid or in the Contract to which this Bid pertains; that this Bid is made without connection or:arrangement with any other person; and that this Bid is in every respect fair and made in good faith, without collusion or fraud. The Bidder agrees if this Bid is accepted, to execute an appropriate City of Miami Beach document for the purpose of establishing a formal contractual relationship between the Bidder and the City of Miami Beach, Florida, for the performance of all requirements to which the Bid pertains. The Bidder states that this Bid is based upon the documents identified by the following number: Bid No. 2018-232-ZD. • • SiGNATURE �}r�r"►0" �. ("as S12t0 P, . 1� \ F RlN TED NAME • TITLE (IF CORPORATION) • • .f, • • BID NO:2018.232-ZD CITYOF MIAMI BEACH NVAI0jBFACH A-5 SUPPLEMENT TO BID/TENDER FORM: DRUG FREE WORKPLACE CERTIFICATION The undersigned Bidder hereby certified that it will provide a drug-free workplace program by: (1) Publishing a statement notifying its employees that the unlawful manufacture, distribution, dispensing; possession, or use of a controlled substance is prohibited in the offeror's workplace, and specifying the actions that will be taken against employees for violations of such prohibition; (2) Establishing a continuing drug-free awareness program to inform its employees about: (i) The dangers of drug abuse in the workplace; . (ii) The Bidder's policy of maintaining a drug-free workplace; (iii) Any available drug counseling, rehabilitation, and employee assistance program's; and (iv) The penalties that may be imposed upon employees for drug abuse violations occurring in the workplace; ' (3) Giving ail employees engaged in performance of the Contract a copy of the statement required by subparagraph (1); (4) Notifying all employees, in writing, of the statement required by subparagraph (1), that as a condition of employment on a covered Contract, the employee shall: (I) Abide by the terms of the statement; and • (ii) Notify. the employer in writing of the employee's conviction under a criminal drug statute for a violation occurring in,the workplace no later than five (5) calendar days after such conviction; (5) Notifying, the City in writing within ten (10) calendar days after receiving notice under subdivision (4) (ii) above, from an employee or otherwise receiving actual notice of such conviction. The notice shall include the position title of the employee; (6) VVithin thirty (30) calendar days after receiving notice under subparagraph (4) of a conviction, taking one of the following actions with respect to an employee who is convicted of a drug abuse violation occurring in the workplace: (i) Taking appropriate personnel action against such employee, up to and including termination; or (ii) .Requiring such employee'to participate satisfactorily in a drug ,abuse assistance or ' rehabilitation program approved for such purposes by a federal, state,'.or local health, law enforcement, or other appropriate agency; and (7) Making a good faith effort to maintain a drug-free workplace -program through implementation of subparagraphs(1)through (6). • • BID NO:2016.232-Mi CITYOF MIAMI BEACH AMBEACH E BE A-5 SUPPLEMENT TO SID/TENDER FORM: DRUG FREE WORKPLACE .CERTIFICATION /42 (Bidder Sign ture) 6� Gi �b.• � �j-.-�E l ^ \nc. (Print Vendor Name). STATE OF F(.oti2 SOA COUNTY OF ra-i a The foregoing instrument was acknowledged before me this 'ZS day of 10 20J, by 1 �.:,���4�,.� ���.F�. ', as (name of person whose signature is being notarized) "ce�;.,i4 k � (title) oft, 4014i t`r5:.�n..s,,"c (name of corporation/company) known to me to be the person described herein, or who produced as identification, and who did/did not take an oath. . NOTARY PLi EHTERAM i(ANi MONT Notary Public-AROEState of FloANAarid ----c z''`�• �•`- Gommisston A GG 228416 (Print Name) :ta '' My Camm. J , 22 "'"Bonded through NationEXptf=sal Nunata29ry 20Assn. My commission expires: • • • BID NO:2018-232-ZD CITYOF MIAMI BEACH =.'ti?'-•t"'d i BEACH A-6 SUPPLEMENT TO BID TENDER FORM: • EQUAL BENEFITS ORDINANCE SUMMARY The foregoing analysis provides a summary of the major points of the proposed Ordinance: 1) What is the intent of the Ordinance? The proposed Ordinance will require certain contractors doing business with the City of Miami Beach, who are awarded a contractpursuant,to competitive bids, to .provide "Equal Benefits" to their employees with Domestic Partners, as they provide to empioyees with spouses. 2) How are "Equal Benefits" defined and what kind of "Benefits" does the Ordinance cover? • "Equal Benefits" means that contractors doing business with the City who are covered by the Ordinance shall be required to provide the same type of benefits that they offer to employees and their spouses, to employees with Domestic Partners. The type of "Benefits" defined by the Ordinance and which may be offered by a contractor include: sick leave, bereavement leave, family medical leave, and health benefits. The "Benefits" defined in the Ordinance are the same type of benefits that the City provides to Domestic Partners of City employees, pursuant to Section 62-XXX of the City Codej. Notwithstanding the definition of "Benefits" In the Ordinance, to comply with the Ordinance a Contractor is not required to provide all the above-described benefits. Contractors are only required to offer the same type of Benefits they offer to their employees with spouses, to employees with Domestic Partners. Additionally, a Contractor who offers no benefits to employees or their spouses, would not be required • to offer any benefits to employees with Domestic Partners (and would still be in compliance with the Ordinance).] 3) Who is considered a "Domestic Partner" under the Ordinance? A "Domestic Partner" shall mean any two (2) adults of the same or different sex who have registered as domestic partners with a government body pursuant to state or local • law authorizing such registration, or with an internal registry maintained by the employer of at least one of the domestic partners. 4) What type of Contracts and/or which Contractors are covered by the Ordinance? The Ordinance only applies to the following: . • • Competitively bid City contracts (bids, RFP's, RFQ's, RFLI's, etc.), • Contracts valued at over$100,000, i • Contractors who maintain 51 or more full time employees on their payrolls during 20 or more calendar work weeks in either the current or the preceding calendar year,. • Contractors covered by the Ordinance are only required to comply as to employees who: 1) either work within the City limits Of the City of Miami Beach; or 2) the contractor's employees located in the United States, but outside of the City limits, only if:those employees are directly performing work on the City contract(covered by the Ordinance). BID NO:2018-232-ZD I Clo` of MIAMI BEACH .v.i.AMIBEACH ' 70 A-6 5) . In what cases does the Ordinance not apply? . The provisions of the Ordinance do not apply where: • • The City contract has been has been entered into prior to the effective date of the . • ,, Ordinance(including renewal terms contained in such contracts); • The City contract is not competitively.bid; • • .The City contract is valued at less than $100,000; • The contractor has less.than 51 employees; . • The contractor does not provide Benefits either•to .employees' spouses or'to employees' Domestic Partners; • The contractor is a religious organization, association, society'or any nonprofit charitable or educational institution or organization operated, supervised or controlled by or in conjunction with a religious organization, association or society; • The contractor is another government entity. The following City contracts are not covered by the Ordinance: • Contracts for sale or lease of City property; • • Development Agreements; • • Contracts/grants for CDSG, HOME, SHIP, and Surtax funds administered by the City's Office of Community Development; . • CuiturakArts Council grants: . • Contracts for professional NE, landscape NE, or survey and mapping services . • procured pursuant to Chapter 287.055, Florida Statutes ("The Consultants Competitive Negotiation Act"; ' . ( • Contracts for the procurement of life, health, accident, hospitalization, legal expense, annuity insurance, or any and all other kinds of insurance for the . officers and employees of the City and their dependents, from a group insurance - ... plan. . The Ordinance provides, upon written recommendation of the City Manager, that the . . City•Commission may, by 5/7ths vote, waive application 'of the Ordinance for the . following: ' • Emergency cornrects; •• • ' • Contracts when;:'only one bid response is received; • Contracts where more than;one bid response is received, but none of the bidders can,comply with the requirements of the Ordinance. ' • • The City's ability to apoly the Ordinance may also be preempted in instances where the .' Ordinance impacts health, retirement, or pension program which fall within the •' • jurisdiction of the Employee Retirement Income Security'Act (ERISA), and may under certain circumstances be held invalid under Federal preemption. • 6) How is the O dinance enforced by the:,City? • . • City contracts that are covered by the Ordinance shall notify potential • bkldar:;/propcsers of the Oroinrrice and its requirements in the ITB documents; • . •• At the time of entering into the contract with the City, the proposed.City . contractor shall certify to the City that it intends to provide Equal Benefits, along • • •. . with the description of its employee benefits plan, which needs to be delivered to the Procurement Director prior to entering into the contract; •� . • BID NO:2018-232-ZD CITYOF MIAMI BSACH MiAMJ BEACH • A6 • The City has the ongoing right to investigate/audit contracts for compliance with the provisions of the Ordinance;, • • The contractor is required to post notice'to its employees at its place of business that it provides Equal Benefits. 7) Is there another way for a Contractor who does not provide Equal Benefits to comply with the Ordinance? If a contractor covered by the Ordinance has made a reasonable yet unsuccessful effort to provide Equal Benet t a, it can, still comply with the Ordinance by providing an . employee with the "Cash Equivalent", of the similar benefit(s) offered to the contractor's employees and their spouses. • 8) What age the penalties for non compliance? • Failure of a contractor to comply with the requirements of the Ordinance may result in • the.follow'nC: • Breach/default under the contract; • Termination of the, contract; ■ Monies due under the contract may,be retained by the City until compliance is r • Debarment of contractors from City work, as prescribed by the City Code. • • • • • • • • • \ Balance of Pave Intentionally Left Blank . • • • • • • • • • • • • • • • • • • • • • • BID NO:2018.232-ZD CITYOF MIAMI BEAACH �i= • 72 :'v'; A-6 MAMBEACH DECLARATION: NONDISCRIMINATION IN'CONTRACTS AND BENEFITS Section 1.Vendor information • Name of Company: 'L c'2u7A CotJ55'twGC1oA grE E- - N 6 (VJ G Name of Company.Contact Person:_4''`'^`"2. ?. 7aSP,ock`A S A-&\ 7 Phone Number: '?—.-1�s)I__Fax Number-3°5— % _'c' E-mail: cC-2-52Cz Vendor Number(if known): Federal ID;or Social Security Number S t- C \30 Approximate Number of Employees in :he U.S.: :(if 50 or less,skip to Section 4,date and sign) Are any of your employees covered by a.coliective bargaining agreement or union trust fund? Yes No Union name(s): • • • Section 2.Compliance Questions ' Question 1.Nondiscrimination-Protected Classes A. Does your company agree to not discriminate against your employees, applicants for employment, employees of the City, or members of the public on lie basis of the fact or perception of a person's membership in the categories listed tei')W Please note: a 'YES" answer means your company agrees it will not discriminate; a "NO" answer means your company refuses to agree that it will not discriminate. Please answer yes or no to each category. tO Race fifes_No ❑ Sex 4es_No 0 Color /Yes_No 7 Sexual Orientation /Yes_No o Creed 'Yes_No Gender identity(transgender status) [Yes_No • Ci Religion %Yes 'No ❑ Domestic partner status _Yes_No National origin Xes_No 0 Marital status •. /Yes_No 0 Ancestry ,(Yes_No C Disability • 14(es_No CO Age • i Yes_No . ❑AIDS/HIV status z/es_No Height /Yes_No ❑Weight; es_No B. Does your company agree to insert a similar nondiscrimination provision in any subcontract you enter into for the performance of a substantial portion of the'contract you have with the City? Please,ncte:you must answer this question,even if-you do not intend to enter into any subcontracts. •• . _Yes_No ' • • BID NO:2018-232-ZD CITYOF MIAMI BEACH , AAIi=,M BEACH . Afi Question 2.Nondiscrimination-Equal Benefits fur Employees with Spouses and Employees with Domestic Partners. When awarding competitively solicited contracts valued:at over $100,000 whose contractors . . maintain 5.1 or more full time employees on their payrolls during 20 or more calendar work weeks, the Equal Benefits for Domestic. Partners Ordinance 2005-3494 requires certain Contractors doing business with the City of Miami Beach, who are awarded a contract pursuant to competitive bids, to provide "Equal Benefits" to their employees with domestic partners, as they provide to employees with spouses. The Ordinance applies to all•employees of a Contractor who work within the City limits of the City of Miami Beach, Florida; and the Contractor's employees located in the United States,:but outside of the City of Miami Beach limits, who are directly performing work on the contract within the City of Miami Beach. , A. Does.your company,provide or offer access to any..benefits to employees with spouses or to spouses of employees? . . . • • (-_j YES I V{ NO B. Does your,company provide or offer access to any benefits to employees with (same or opposite sex)•domestic partners* or to domestic partners of employees? • • = YES 1 fr7 NO . C. Please check all benefits that apply to your answers above and list in the "other" section . any additional -benefits not already specified. ,Note: some benefits are provided to employees because they have a spouse or domestic partner, such as bereavement leave; . other benefits are provided directly to the.spouse or domestic partner,..such as medical insurance. • • • BENEFIT Firm Provides Firm Provides Firm does not for Employees for Employees Provide Benefit j —_ withSpouses with Domestic . L Partners __��_ — .✓ Health •. -- Sick Leave . r=ay-r;iiy Medical �' . r� i �eav • Bereavement, • . I. Leave . • If Proposer cannot-offer a benefit to domestic partnere because of reasons outside your control, (e.g., there are r•eo inSorance providers in your area v iliing•to offer domestic partner coverage) you may be eligible for Reasonable Measures compliance. To comply on this basis, you must •agree to .pay a cash equivalent and submit a completed Reasonable Measures Application (attached) with ail necessary ducumentatio�n. .Your Reasonable Measures Application 'will be• . reviewed for consideration by the City Manager, or his designee. Approval is not guaranteed and the City Man agsr'a decision is final. Further in ortination on the Equal Benefits requirement is available at: vii.T: ,rt,ibeac.fl.n_ov/orpcurernenfi/ • • • \• • • • BID NO:2018-232-ZD Ci Y0F FIIANII BEACH MIA IBEACH A-6 Section 3.Required Documentation YOU MUST SUBMIT SUPPORTING DOCUMENTATION to verify each benefit marked.in Question 2C. Without proper documentation,your company cannot be certified as complying with the City's Equal Benefits Requirement for Domestic Partner Ordinance. For example, to document medical insurance submit a statement from your insurance provider or a copy of the eligibility section of your plan document to document leave programs,submit a copy of your. company's employee handbook. If documentation for a particular benefit does not exist,attach an explanation. Have you submitted supporting documentation for each benefit offered? _Yeso Section 4.Executing the Document I declare under penalty of perjury under the laws of the State of Florida that the foregoing is true and correct, and that I am authorized to bind this entity contractually. Executed this 'y-s dayof 10 in the year 2-e.\% at PA u - • 155 t3 e,..-),-Ler 7t (opt Signature - / Mailing Address • VNP,'J kV \ SPGo.-As 332G6 Name of Signatory City,;State,Zip Code Title • • • • • • • • BID NO:201 3-232-7_D CITYOF MIAMI BEACH ";!<<AM BEACh-i 75 A-6 MIAMI BEACH REASONABLE MEASURES APPLICATION Declaration: Nondiscrimination in Contracts and Benefits • Submit this form and supporting documentation to the City's Procurement Department ONLY IF you: A. Have taken all reasonable measures to end discrimination in benefits; B. Are unable to do so; and C. Intend to offer a cash equivalent to employees for whom equalbenefits are not available. You must submit the following information with this form: 9 The names, contact persons and telephone numbers of benefits providers contacted for the , purpose of acquiring nondiscriminatory benefits;; 10 The dates on which such benefits providers were contacted; 11 Copies of any written response(s).you received from such benefits providers,and if written responses are unavailable, summaries of oral responses;and 12 Any other information you feel is relevant to documenting your inability to end discrimination in benefits, including, but not limited to, reference to federal or state laws which preclude the ending of discrimination in benefits. Ideclare (or certify) under penalty of perjury under the laws of the State of Florida that the foregoing istrue and correct,and that I am authorized tobind this entity contractually. Name of Company(please print) Mailing Address of Company Signature - City,State,Zip • • Name of Signatoiy(pCeaseti int, Telephone Number •Title Date • • BID NO:2013-2322D CITYOF MIAMI BEACH tvtIAMIBEAC; k 76 A-6 Definition off Terms A. Reasonable Measures The City of Miami Beach will determine whether a City Contractor has taken all reasonable measures provided by the City Contractor that demonstrates that it is not possible for the City Contractor to end discrimination in benefits. A determination that it is not possible for the City. Contractor to end discrimination in benefits shall be based upon a consideration of such factors as: 1. The number of benefits providers identified and;contacted, in writing, by the City Contractor, and written documentation from these providers that they will not provide equal benefits; 2. The existence of benefits providers willing to offer•equal benefits to the City Contractor and • • 3. The existence of federal or state laws which preclude the City Contractor from ending discrimination in benefits. • • • B.Cash Equivalent 'Cash Equivalent"means the amount of money paid to an employee with a Domestic Partner(or spouse, . if applicable) in lieu of providing Benefits to the employees'!Domestic partner (or spouse, if applicable). The Cash Equivalent is equal to 'The employer's direct expense of providing Benefits to an employee for his or her spouse. Cash Equivalent The cash equivalent of the following benefits apply: A. For bereavement leave, cash payment for the number of days that would be allowed as paid time off for death of a spouse. Cash payment would be in the form of wages of the domestic partner employee for the number of days allowed B. For health benefits, the cost to the Contractor of the Contractor's share of the single monthly :premiums that are being paid for the domestic partner employee, to be paid on a regular basis while the domestic partner employee maintains the such insurance in force for himself or herself. C. For family medical leave; cash payments for the number of days that would be allowed as - time off for an employee to care for a spouses that has a serious health condition. Cash ,. . . payment would be In the form of wages of the domestic partner employee for the number of - days allowed. • • • • • • BID NO:2018-232-Z® CITYOF MIAMI BEACH ,._,AI, .,.,J BEACH, 77 • - t A-6 MIAM1BEACH SUBSTANTIAL_COMPLIANCE AUTHORIZATION FORM Declaration: Nondiscrimination in Contracts and Benefits This form, and supporting documentation, must be submitted to the Procurement Department by entities seeking to contract with the City of Miami Beach that wish to delay ending their discrimination in benefits pursuant to the Rules of Procedure, as set out below. Fill out all sections that apply. Attach additional sheets as necessary. A. Open Enrollment Ending discrimination in benefits may be delayed until tie first effective date after the first open enrollment process following the date the contract with the City begins, provided that the City Contractor submits to the Procurement Department evidence that reasonable efforts are being undertaken to end discrimination in benefits. This delay may not exceed two years from the date the contract with the City is. entered into, and only applies to benefits for which an open enrollment process is applicable. • Date next benefits pian year begins: • Date nondiscriminatory benefits will be available: • • Reason for Delay: • Description of efforts being undertaken to end discrimination in benefits: • • • • t.IT'YOF MIAMI BEACH ' ti.e,;ftii BEACH BID No:.ao�$-asa-zr� , :��..,. in • f , A-6 B. Administrative inistr.tive Actions and Request for Extension • Ending discrimination in benefits may be delayed to allow administrative steps to be taken to incorporate nondiscriminatory benefits into the City Contractor's infrastructure. The time allotted for these administrative steps shall apply only to those benefits for which administrative steps are necessary and may not exceed three months. An extension of this time may be granted at the discretion of the Procurement Director, upon the written request of the City Contractor. Administrative steps may include, but are not limited to, such actions as computer systems modifications, personnel policy revisions, and • the deveicprneni ab:ii dis'tribu"ion of empicyce communications. • • Description of administrative steps and dates to be achieved: • If requesting extension beyond three months, please explain basis: • • • C. Collective Bargaining Agreements(CBA) • • Ending discrimination in benefits may be delayed until the expiration of a City Contractor's Current • • collective bargaining agreement(s)where all of the following conditions have been met: • 1. The provision of benefits is governed by one or morecollective bargaining agreement(s); 2. The City Contractor takes ail reasonable measures to end discrimination in benefits either by' • requesting that the Unions involved agree to reopen the agreements in order for the City • Contractor to take whatever steps necessary to end discrimination in benefits or by ending • discrimination in benefits without reopening the collective bargaining agreements; and • • 3. in the event that the City Contractor cannot end discrimination in benefits despite taking all reasonable measures to do so, the City Contractor provides a cash equivalent to eligible employees for whom benefits are not available. Unless otherwise authorized in writing by the • Procurement Director, this cash equivalent paymentmustbegin at the time the Unions refuse to. allow the collective bargaining.agreements to be reopened, or in any case no longer than three • (3)months from the date the contract with the City is entered into. • For a delay to be granted under this provision,written proof must be submitted with this form that: 1 • The b-,f j*$fcr'whici•:the aeiay is requested are governed by a collective bargaining agreement; • • Ai reasc'fnabl'e i"ncasures. have been taken to end discrimination in benefits (see Section C.2, above); and • • A ce=sh equivalent peiy?nent avisl be proVideci to eligible employees for, whom benefits are not • available. • • • • • • • • BID NO:2018-232-2O C!'!'t'otr io1IAlit1!BEACH jt A A M BEACH 79 A-6 I declare (or certify) under penalty of perjury under the laws of the State of Florida that the foregoing is true and correct,and that I am authorized to bind this entity contractually. Name of Company (please print) Mailing Address of Company Signature City,State,Zip Name of Signatory(please print)r Telephone Number Title Date • BID NO:2018-232-ZD CITYOF MIAMI BEACH AhIAME BEACH 80 A_7 • SUPPLEMENT TO BID/TENDER FORM: TRENCH SAFETY.ACT • IF APPLICABLE, THIS FORM MUST BE SUBMITTED WITH BID FOR BID TO BE DEEMED RESPONSIVE. (SEE SECTION 00407) • On October 1, 1990 House Bill 3181, known as the Trench Safety Act became law. This incorporates the Occiipationai Safety& Health Administration (OSHA)revised excavation safety standards.ds. citagon 2G CFR.S.1920.8:30, as Florida's own•standards. The Bidder, by virtue of the signature below, affirms that the Bidder is aware of this Act, and will comply with Ai apclicanle trench safety standards. Such'assurance shall be legally binding on all persons employed by the Bidder and subcontractors. The Bidder is also obligated to identify the anticipated method and cost of compliance with the . appli,;:ai;bk 'trench ss ry.Trirkifyz:s. BIDDER ACKNOWLEDGES THATIINCLUDED IN THE VARIOUS ITEMS OF THE BID AND IN THE TOTAL BO PRICE Af; COTs FOR COMPLYING WITH. THE FLORIDA TRENCH SAFETY,=CT. 'H$ •S . I'!'E hA i ARE A BREAKOUT OF THE RESPECTIVE ITEMS INVOLVING TRENCHING AND WILL NOT BE PAID SEPARATELY. THEY ARE NOT-TO BE CONFUSED WITH BID ITEMS IN THE SCHEDULE OF PRICES, NOR BE CONSIDERED ADDITIONAL WORK. The Bidder further identiled the costs and methods summarized below: f wrwntity Unit Delic ption Price i Price Extended Method • • • • • • Total $ •• • • Florida Construction & Engineering, Incj Name of Bidder Authorized Si ature of Bidder BID NO:2018-232-z0 CI1YOF MIAMI BEACH :r`,;r•' '`BEACH .. r - 81 A-7 CONSIDERATION FOR INDEMNIFICATION OF Crry, Consideration for Indemnification of City $25.00 0 Cost for cOmpliance to all Federal and State requirements of the Trench Safety Act* — (NOTE: itthl box above is chec4ed, the Bidder must fill out the foregoing Trench Safety Act Form (Attachment A-7)in order to be considered responsive.] BID NO:2018-232-ZD CITYOF MIAMI BEACH BEACH 82 i I t A=8 RECYCLED CONTENT INFORMATION In support of the Florida Waste Management Law, Bidders are encouraged to supply with their bid, any information available regarding recycled matenal content in the products bid. The City is particularly interested in the type of recycled material used (such as paper, plastic, glass, metal, etc.); and the percentage of recycled material,contained`in the product. The City also requests information regarding any known or potential material content in the product that may be extracted and recycled after the product has served its intended purpose. ' er at.po a y: �z. stat u.L 14. X1+3 �,u a o7 C.s -g'3. 1 ,. : . PIJi#w,; ri # S67^ "Y, a..- if �y ri:i �_-.xT5�1,FFtr y ,0: - ; ± �' -7=r"f' .4 'z''' :I., �. ..,2 1.. .( P.1.•/5'‘.6r:, 3a, N• 5 iS7/o • • I I • • BID NO:2018-232-ZD CITYOF MAN BEACH trAi ANttiBEACH ArT • City,of Miami Beach ITB PRICE FORM-1 (REVISION 1) 17STREET PARKING GARAGE - Location_ 640-17th Street,Miami Beach, FL 33139 The TOTAL BASE BID amount includes the all-inclusive total•cost for the work specified in this bid,consisting of furnishing all materials,labor,equipment, shoring,supervision,mobilization,demobilization,overhead and profit,insurance,permits,and taxes to complete the work to the full Intent as shown or indieatedln'the.contract documents.Any or all alternates,If applicable,may he selected at the City's sole disaetion and based on funding availability. BIDDER MUST SUBMIT THIS ITB PRiCE FORM FULLY COMPLETED, INCLUDING SECTIONS 1 AND 2,AS PART OF THE BID RESPONSE. FAILURE TO DO SO SHALL DEEM THE BIDDER NONRESPONSIVE. In the event of arithmetical errors.between the division totals and thetotal base bid,the Bidder agrees that the total base bid shall govern.In the event of a discrepancy between the numerical total base bid and the written:totafbase bid,the written total baie.bfd shall govern.In absence of totals submitted for any division cost,the City shall btt caret as en bid far the division,Which may disqualify bidder. 70R�..�'-�rgvf fOJ..—CTT `11,e I1 00, .Gam�aDtc s >tOPIDt6th1eri f aY't7.th*Softrei eg as�Z�rtUai ti.-�oahtfuendanerv/�crei fkf �Ga la lir-4iVl L4I-TOre:f 5�;ti ; 'S �4 ek ias1r74. ln� i Waterproofing Parking Spaces Only .$ 644 OQQ Waterproofing Driving Lanes Only+Maintenance of Traffic(M.O.T.) Permits Allowance $40,00000 Owner's Contingency $10,000.00 s 'Lump Sunt Grand Tata:-CR:tat Bast=Sidi `/ } *PROJECT SHALL BE AWARDED TO THE LOWEST, RESPONSIVE, RESPONSIBLE BIDDER OFFERING THE LOWEST LUMP SUM GRAND TOTAL(TOTAL BASE BID) Section 2-Bidder's Affirmation; l Company: ft Oe(i- N. Cb N 51-52-L3 o ,4 tco.16%NYe•Ezi 1,-1G Address Line 4.4 ISS �GfVTI c `( lZ Address Line 2; wit1/4 stO 65 3-tI G G Telephone: zn S — `8$3 — 0 Email: S Z Al.o o - Cc M 1 , Signature: j_7/ - Title/Printed Name: A M 7 eR �, �k�1�5IAA\k \ Date: FAILURE TO SUBMIT THiS FORM FULLY EXECUTED AND BID BOND(IF APPLICABLE) WITH BID SUBMITTAL SHALL.RESULT IN BEING DEEMED NONRESPONSIVE. Note: Prevailing Wage Rates &Local Workforce Program Requirements are applicable for each parking garage whose estimated costs exceed $1,000,000.00. Refer to Section 0200 and Appendix D for additional information. • ��. 10 ADDENDUM NO.5 I INVITATION TO BiD(ITB)NO.2O18-232-ZD WATERPROOFING-TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH,16TH,17TH STREET, AND 1755 MERIDIAN AVENUE GARAGES(INDIVIDUAL PROJECTS). A-1 City of Miami Beach) • : .ITB PRICE FORM- 2(REVISION 1) 12 STREET PARKING GARAGE Location:5'12-12t St,Miami Beach, FL 33139 The TOTAL BASE BID amount includes the ail-Inclusivetotal cost for the work speckled In this-bid,consisting of furnishing all materials,labor,equipment, shoring,supervision,mobilization,demobilization,overhead and profit,Insurance;permits,and taxes to complete the work to the full intent as shown or indicated in the contract documents.Any or all alternates,if applicable,may be selected'atthoCity's sole discretion and based on funding availability. BIDDER MUST SUBMIT THIS ITB PRICE FORM FULLY COMPLETED, INCLUDING SECTIONS 1.AND 2, AS PART OF THE BID RESPONSE. FAILURE TO DO SO SHALL DEEM THE BIDDER NONRESPONSIVE:. in the event of arithmetical errors between the division totals and the total base bid,the Bidder agrees that the total base bid shall govern.In the eventol a discrepancy between the numerical total base bid and the written total base bid,the written total base bid shall govern.in absence of totals submitted for any division cost,the Citi shall interpret as no bid for the division,which may disqualify bidder. � �'o�t 14RedErT t:ATB f3#—A 1] it i tec}itoofii "T•raf is`Ct�atiif POyiaesVor Pacni ;: Garag ccs h tlse .fi2fft,`�16th,� lTftt Sfie"eta artcI 755' ler di3I Avenge Ga ges: [>a rdwal fco ectsj;�. yy _ N` .a.� �, f , ..�. . .h.-- ...i'S.'e', -.-4','i .-y{.. �.✓Y [i.:!.�rayY S-Mst_7!'... _.1I-"^T.li..�!. 'Y` ,.4�. . 3R.. ••:, i Concrete Repairs $ 2? ,, 15 Waterproofing Parking Spaces Only $ 55 S D Waterproofing Driving Lanes+Maintenance of.Traffic(M.O.T.) $3 7 / 2.6 D Permits Allowance $30,000.00 Owner's:Contingency $201000.00 'Lum r f pase Bi ;Strm Grand Total(Total Base $6/ W UQ 5 PROJECT SHALL BE AWARDED TO THE LOWEST, RESPONSIVE, RESPONSIBLE BIDDER OFFERiI LOWEST LUMP SUM GRAND TOTAL(TOTAL.BASE BID)' Section 2- Bidder's Affirmation: Company: EL oat iJ, c i i Q j art► •� G 1iV F / N36 l C Address Line 1: I ss R NTI-�`� y0a. Address Linen: likisA% S fa.%(k.3 Gs FL_ 3316 e Telephone: 3 o S — g,$b — i 6,6 I — Email: - 1 roa • .111 I Signature: 1 Title/Printed Name: — t . t Date: r FAILURE TO SUBMIT THIS FORM FULLY EXECUTED AND BID BOND (iF APPLICABLE)WITH BID SUBMITTAL SHALL,RESULT IN BEiNG DEEMED NONRESPONSIVE. Note: Prevailing.Wage Rates & Local Workforce Program Requirements are applicable for each parking garage whose estimated costs exceed $1,000,000.00. Refer to Section 0200 and Appendix D for additional information. + 11 ADDENDUM NO.5 • INVITATION TO.SID(ITB)NO.2018-232-ZD WATERPROOFING-TRAFFIC COATING SERVICES.FOR PARKING GARAGE DECKS AT THE 12TH,16TH,17TH STREET, l AND 1755 MERIDIAN AVENUE GARAGES(INDIVIDUAL PROJECTS) 11� i l � A-1 City of Miami Beach. IITB PRICE FORM-3(REVISION 1) • • _ 16714 STREET PARKING GARAGEs. _' -Location:10 -16t Street,Miami Beach,FL 33139 { The TOTAL BASE BID amount lhdudas the ail-inclusive total cast far the work speclfled.in dila bid,consistingof furnishing all materials,,labor,equipment, shoring,supervision,.mobilization,demobilization,overhead,and profit,insurance,permits,and taxes to complete he work to the full Intent as shown or indicated(r<ahe contracidocuments.Any or ill alternates,If applicable,may be selected atthe City's sale disaetion and based on funding availability, BIDDER MUST SUBMIT THIS ITS PRICE FORM.FULLY COMPLETED, INCLUDING SECTIONS 1 AND 2, AS PART OF THE BID RESPONSE. FAILURE.TO DO SO SHALL DEEM THE BIDDER NONRESPONSIVE,. In the event of arithmetical errors between the division totals and the total basebid,the Bidder agrees that the total base bid shall govern.In tho event of a discrepancy between the numerical total base bid and the written total base bid;the written total base bid shall govern.In absence of totals submitted for any division cost the City alai Interpret as no bid for the division.which may disqualify bidder. nk c e 2r ria.r—.. ;::.. x_,�gc .Sectfl `Bidcr.e 7 -{':ae t'} , :Y::,.: s�'.� Pi to tEcF 4.5TB-2018 2322-ZD4•1-9la 01F,-- t�,4 affic Caatl g xSel"vic�s ar Pa fc g jGar`gesmat�file X12 6ffi T.ff ke7 ,- Inde 5. `�tl '>idO tAv97*ZG- ageti r .r. te. .m�.K.. „� 1+0:47404- ! l any� " trtr*' $ ,.,�,� Concrete Repairs $ Z 'S 0 Waterproofing Parking.'Spaces Only, $ ( /. 6 56 / 000 Waterproofing Driving Lanes+Maintenance of'Traff is(M.O.T.) $ G / Q 40 Permits Allowance $90,000.00 Owner's Contingency $40,000.00 • 'Lump Sum Grand Total(Total Base Bid j $ ( "t 0 1 / b l PROJECT SHALL BE AWARDED TO.THE LOWEST,RESPONSIVE,RESPONSIBLE BIDDER OFFERING THE LOWEST LUMP SUM GRAND TOTAL(TOTAL BASE BID) Section 2-Bidder's Affirmation: Company: FL,D2iDA COn1ST1L- crto1.1 4 .E,f,�G1NGERLNG iNc-• Address Line 1: s 5 d3�Gi�-rLe.i 7L 2. AddressLine2: Mvprnn� SPRINGS 3" 166 Telephone: 30 S _ Email: fCP_ 5Z_CD.7c.k•oo • Co nn Signature:. ,t n,e.�i✓�^ Title/Printed Name: "PRESkb r��` / YkArrkt, '' 7j (ikvtiPrN S L tIrkF Date: FAILURE TO SUBMIT THIS FORM FULLY EXECUTED AND BID BOND (IF APPLICABLE)WITH BID SUBMITTAL SHALL RESULT IN BEING DEEMED NONRESPONSIVE. Note: Prevailing Wage Rates & Local Workforce Program.Requirements areapplicable for each parking garage whose estimated costs exceed $1,000,0.00:00. Refer to Section 0200 and Appendix D for additional information. (Th 12ADDENDUM NO.5 INVITATION TO SID(ITS)NO.201S-232-ZD ' WATERPROOFING-TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH..16TH,17TH STREET, AND 1T55 MERIDIAN AVENUE GARAGES(INDIVIDUAL PROJECTS) . A-1 R. Caty_of•Miami Beach •- - . - • - - . . ITB PRICE FORM-4' (REVISION 1) 1755 MERIDIAN AVE PARKING GARAGE Location 1755 Meridian Ave., Miami Beach, FL 33139 • The TOTAL BASE.BID amount includes the'all-Induslve total cost for the work specified In nits bid.consisting of furnishing all materials,labor,equipment, shoring,supervision,mobilization,demobilization,overhead and profit,Insurance,permits',and taxes to complete the work to the full intentas shawn or Indicated In the contract documents.Any or all alternates,If applicable,may be selected at the City's sole discretion and based on flndlhgavallablllbr. BIDDER MUST SUBMIT THIS ITS PRICE FORM FULLY COMPLETED,INCLUDING SECTIONS 1 AND 2,AS PART OF THE BID RESPONSE. FAILURE TO DO SO SHALL DEEM THE BIDDERNONRESPONSIVE: . In the event of arithmetical errors between the division totals and the total base bid,the Bidder agrees that the total base bid shall govern,in the event of a discrepancy between the numerical total base bid and the written total base bid,the written total base bid shall govern.In absence of tatalssubmltted for any division cast the City shatlinterpret as no bid fertile Civilian.which may disauai[fy bidder. x �: �w� ecLlocir"i ;driersPEICB ," y`fir l wi `tii.a+-'�' �x^ Yt �...`?-�`S's�."'`�,�r�„�. a�i�`"�$:�w,,,.�• '�../�'�i4{ ���tfi r.+Rl v�. ' O.PECtigitt E 4-trA tAg wise Wafe roofieviiTtaf L q-64t g Sel�nces for xPac&ing: , r�' :i;..y, •...c � e.. tx'r � wL.d , arageDeckSa(t irfieiF6tfi, Tth{; TStxeet, acf [ Meted alt .A e*Gatages Concrete Repairs $ ) S p 0 Waterproofing Parking Spaces Only IINEEISIEM Waterproofing Driving Lanes+Maintenance of Traffic(M.O:T.) $ (,2 '/ I DO Permits Allowance $95,000.00 Owner's Contingency 40,000.00 " > " •� " -•• - I r ''Lump Stun Grand Total(Total Base Bide $ I �j / 100 PROJECT SHALL BE AWARDED TO THE LOWEST,,RESPONSIVE; RESPONSIBLE BIDDER OFFERING THE ' LOWEST LUMP SUM.GRAND TOTAL(TOTAL BASE BID) Section 2-Bidder's.Affirmation: • Company: Ofa.I bp, Co iJ ST2v C-n o rl a r n161 N'fcEle.l i' 6 Address Line 1: . .5 A. ^- ta- / Address Line 2: kit AcMi C,�t2.t 1�1G S FL r3 ‘6,c - j Telephone: cz0 S — )2, 7 — 760 I Email: (+ e 4\"Or), Ct,i'vt Signature: f� 2 Titre/Printed Name: '7g`r\b SPS{�1� 17Sh� pc-j\J Date: FAILURE TO SUBMIT THiS FORM FULLY,EXECUTED AND BID BOND (iF APPLICABLE)WiTH BiD SUBMITTAL SHALL RESULT IN BEING DEEMED NONRESPONSIVE. Note: Prevailing Wage Rates&Local Workforce.Program Requirements are applicable for each parking , garage whose estimated costs exceed $1,000,000.00. Refer to Section 0200 and.Appendix D for additional information. • 13 ADDENDUM.NO.S INVITATION TO SIP(ITB)NO.2018-232-ZD WATERPROOFING-TRAFFIC COATING SERVICES FOR PARKING GARAGE DECKS AT THE 12TH.16TH.17TH STREET, AND 1755 MERIDIAN AVENUE GARAGES(INDIVIDUAL PROJECTS) ' ATTACHMENT D INSURANCE REQUIREMENTS holder's Size Amount of Bond Ratings Category 500,001 to 1,000,000 B+ Class I 1,000,001 to 2,000,000 B+ Class II 2,000,001 to 5,000,000 A Class III • 5,000,001 to 10,000,000 A Class IV 10,000,001 to 25,000,000 A Class V 25,000,001 to 50,000,000 A Class VI 50,000,001 or more A Class VII 6.2. For projects of$500,000.00 or less, City may accept a Bid Bond, Performance Bond and Payment Bond from a surety company which has twice the minimum surplus and capital required by the Florida Insurance Code at the time the invitation to bid is issued, if the surety company is otherwise in compliance with the provisions of the Florida Insurance Code, and if the surety company holds a currently valid certificate of authority issued by the United States Department of the Treasury under Section 9304 to 9308 of Title 31 of the United States Code, as may be amended from time to time. The Certificate and Affidavit so certifying should be submitted with the Bid Bond and also-with the Performance Bond and Payment Bond. 6.3. More stringent requirements of any grantor agency are set forth within the Supplemental Conditions. If there are no more stringent'requirements, the provisions of this section shall apply. • 7. Indemnification 7.1 Contractor shall indemnify, defend, and hold harmless City, its officers, agents, directors, and employees, from liabilities, damages, losses, and costs, including, but not limited to reasonable attorney's fees, to the extent caused by the negligence, recklessness or intentional wrongful misconduct of Contractor and persons employed or utilized by Contractor in the performance of this Agreement. Except as specifically provided herein, this Agreement does not require Contractor to indemnify City, its employees, officers, directors, or agents from any liability, damage, loss, claim, action, or proceeding. This indemnification provision shall survive the term of this Agreement. In the event that any action or proceeding is brought against City by reason of any such claim or demand, Contractor shall, upon written notice from City, resist and defend such action or proceeding by counsel satisfactory to City. 7.2 The indemnification provided above shall obligate Contractor to defend at its own expense to and through appellate, supplemental or bankruptcy proceeding, or to provide for such defense, at City's option, any and all claims of liability and all suits and actions of every name and description covered by Section 7.1 above which may be brought against City whether performed by Contractor , or persons employed or utilized by Contractor. 8. Insurance Requirements: 8.1 The Bidder shall furnish to the Procurement Department, City of Miami Beach, 1755 Meridian Avenue, 3`d Floor, Miami, Florida 33139, Certificate(s) of Insurance which indicate that insurance coverage has been obtained which meets the requirements as outlined below: BID NO: 2018-232-ZD CITYOF MIAMI BEACH MIAMI BEACH 22 A. Worker's Compensation Insurance as required by Florida, with Statutory limits and Employer's Liability Insurance with limit of no less than $1,000,000 per accident for bodily injury or disease. 7 B. Commercial General Liability Insurance on an occurrence basis, including products and completed operations, contractual liability, property damage, bodily injury and personal & advertising injury with limits no less than $2,000,000 per occurrence. C. Automobile Liability Insurance covering all owned, non-owned and hired vehicles used in connection with the work, in an amount not less than $2,000,000 combined single limit per occurrence, for bodily injury and property damage. D. Builders Risk Insurance utilizing an "All Risk" coverage form, with limits equal to the completed value of the project and no coinsurance penalty. (City of Miami Beach shall be named as a Loss Payee on this_policy, as its interest may appear. This policy shall remain in force until acceptance of the project by the City.) E. Umbrella Liability, with limits no less than $10,000,000. The umbrella coverage must be as, broad as the primary General Liability coverage. F. Contractors' Pollution Legal Liability (if project involves environmental hazards), with limits no less than $1,000,000 per occurrence or claim, and $2,000,000 policy aggregate. 8.2 Additional Insured Status . The City of Miami Beach must be covered as an additional insured with respect to liability arising out of work or operations performed by or on behalf of the Consultant. 8.3 - Waiver of Subrogation • Contractor hereby grants to City of Miami Beach a waiver of any right to subrogation which any insurer of the Contractor may acquire against the City of Miami Beach by virtue of the payment of any loss under such insurance. Contractor agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not the City of Miami Beach has received a waiver of subrogation endorsement from the insurer. • Other Insurance Provisions 1. For any claims related to this project, the Contractor's coverage shall be primary insurance as respects the City of Miami Beach, its officials, officers, employees, and volunteers. Any insurance or self-insurance maintained by the City of Miami Beach shall be excess of the Contractor's insurance and shall not contribute with it. 2. Each policy required by this clause shall:provide that coverage shall not be canceled, except with notice to the City of Miami Beach. 3. If any excavation work is included in the Contract, it is understood and agreed that Contractor's Liability policy shall not contain exclusion for XCU (Explosion, Collapse and Underground) coverage. BID NO: 2018-232-ZD CITYOF MIAMI BEACH MIAMI 23 if any coverage required is written on a claims-made form: 4. The retroactive date must be shown, and must be before the date of the contract or the beginning of contract work. 5. Insurance must be maintained and evidence.of insurance must be provided for at least five (5) years after completion of the contract of work. 6. If coverage is canceled or non-renewed, and not replaced with another claims- ' made policy form with a retroactive date prior to the contract effective date, the Contractor must purchase extended period coverage for a minimum of five (5) years after completion of the contract work: 7. A copy of the claims reporting requirements must be submitted to the City of Miami Beach Risk Management(or its designee) for review. 8. If the services involved lead-based paint or asbestos identification/ remediation, the Contractors Pollution Liability shall not contain lead-based paint or asbestos exclusions. If the services involve mold identification/remediation, the Contractors Pollution Liability shall not contain a mold exclusion and the definition of"Pollution"shall include microbial matter including mold. • 8.4 Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best's rating of no less than A:VII, unless otherwise acceptable to the City of Miami Beach Risk Management Office. 8.5 Verification of Coverage Contractor shall provide the required insurance certificates, endorsements or -applicable policy language effecting coverage required by this Section. All certificates of insurance and endorsements are to be received prior to any work commencing. However, failure to obtain the required coverage prior to the work beginning shall not waive the Contractor's obligation to provide them. The City of Miami Beach reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time. 8.6 Special Risks or Circumstances The .City of Miami Beach reserves the right to modify these ,requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances. BID NO:2018-232-ZD CITYOF MIAMI BEACH M1M1 (BERCH 24 Certificate Holder: CITY OF MIAMI BEACH do PROCUREMENT DEPARTMENT 1700 CONVENTION CENTER DRIVE MIAMI BEACH, FL 33139 Compliance with the foregoing requirements shall not relieve the vendor of his liability and-obligation under this section or under any other section of this agreement. 9. Labor and Materials: 9.1. Unless otherwise provided herein, Contractor shall provideand pay for all materials, labor, water, tools, equipment, light, power, transportation and other facilities and services necessary for.the proper execution and completion of-the Work, whether'temporary or permanent and whether or not incorporated or to be incorporated in the Work. 9.2. Contractor shall at all times enforce strict discipline and good order among its employees and subcontractors at the Project site and shall not employ on the Project any unfit person or anyone not skilled in the work to which they are assigned. 10. ' Royalties and Patents: All fees, royalties, and claims for any invention, or pretended inventions, or patent of any article, material, arrangement, appliance, or method that may be used upon or in any manner be connected with the construction of the Work or appurtenances, are hereby included in the prices stipulated in this Contract for said work. 11. Weather: I Extensions to the Contract Time for delays caused by the effects of inclement weather shall be submitted as a request for a change in the Contract Time pursuant to Article 40. These time extensions are justified only when rains or other inclement weather conditions or related adverse soil conditions prevent Contractor from productively performing controlling items of work identified on the accepted schedule or updates resulting in: (1) Contractor being unable to work at least fifty percent (50%) of the normal workday on controlling items, of work identified 'on the accepted schedule or updates due to adverse weather conditions; or (2) , Contractor must make major repairs to the Work damaged by weather. Providing the damage was not attributable to a failure to perform or neglect by Contractor, and providing that Contractor was unable to work at least fifty percent (50%) of the normal workday on controlling items of work identified on the accepted schedule or updates. ' 12. Permits, Licenses and Impact Fees: 12.1. Except as otherwise provided within the Supplemental Conditions, all permits ' and licenses required by federal, state or local laws, rules and regulations BID NO: 2018-232-ZD CITYOF MIAMI BEACH MIA11/4AI BEACH 25 1