Parks, Recreation & Cultural Facilities Project DescriptionsPARKS, RECREATIONAL, AND CULTURAL FACILITIES
GENERAL OBLIGATION BOND
WWW.GOMB 2018 .COM .................
PUBLIC INFORMATION PROGRAM | CITY OF MIAMI BEACH
PRODUCED & PRINTED BY TROPICOLOR PRINT STUDIO | MIAMI BEACHBuild new facility at 72nd Street
between Collins Avenue and
Harding Avenue that includes new
recreational park space, roof-top
competition pool, library/media
center, fitness gym with running
track, and parking garage.
New pavers for walkways and plaza
throughout the park located at
2100 Collins Avenue, to improve
aesthetics and reduce ongoing
repairs and maintenance.
Implement various improvements
to the park at 7801 Crespi
Boulevard, including a new
walking/jogging path, fence
replacement, and new paint
and flooring to the building and
restrooms.
72ND STREET PARK, LIBRARY,
& AQUATIC CENTER COLLINS PARK
CRESPI PARK
$53.8 MILLION
#01 #02
#03
$640,000
$211,000
Implement various improvements
to the park located at 200
Fairway Drive, including fence
replacement and painting of the
pavilion, office, and restrooms.
FAIRWAY PARK#04
$260,000
PARKS, RECREATIONAL, AND CULTURAL FACILITIES
GENERAL OBLIGATION BOND
WWW.GOMB 2018 .COM .................
PUBLIC INFORMATION PROGRAM | CITY OF MIAMI BEACH
PRODUCED & PRINTED BY TROPICOLOR PRINT STUDIO | MIAMI BEACHPlayground replacement
at the park located at
Lakeview Drive and Alton
Road.
Replace Recreation Center (PAL)
at 1200 Meridian Avenue with a
new 30,000 square foot facility
including a basketball gym, indoor
running track, fitness center,
locker rooms, community meeting
rooms, classrooms, master plan
improvements and resiliency
enhancements.
Playground replacement
at the park located at 6421
Alton Road.
FISHER PARK
LA GORCE PARK
#06
#07
$105,000
$150,000
FLAMINGO PARK
& YOUTH CENTER
$30.55 MILLION
#05
Improvements to park
located at 1130 Ocean Drive,
including landscaping, sod,
irrigation, restrooms, upgrade
of pathways similar to South
Pointe Park, new wayfinding
signage, and tree planting.
LUMMUS PARK#08
$4.7 MILLION
PARKS, RECREATIONAL, AND CULTURAL FACILITIES
GENERAL OBLIGATION BOND
WWW.GOMB 2018 .COM .................
PUBLIC INFORMATION PROGRAM | CITY OF MIAMI BEACH
PRODUCED & PRINTED BY TROPICOLOR PRINT STUDIO | MIAMI BEACHImplement various improve-
ments to park located at Ocean
Drive and 2nd Street, including
playground replacement,
sidewalk upgrade, quick release
shade structure, and turtle-
friendly lighting.
Improve park located at 18th
Street and Purdy Avenue,
including soil remediation,
new landscaping, irrigation,
signage, benches, playground
replacement, fitness circuit, and
resiliency elements.
Install artificial turf at park
located at 4300 Chase Avenue,
to improve field availability and
reduce grounds maintenance
services.
MUSS PARK
MAURICE GIBB PARK
#11
#10
$250,000
$3.3 MILLION
MARJORY STONEMAN
DOUGLAS PARK
$682,000
#09
NORTH BEACH OCEANSIDE
PARK BEACHWALK#12
$2 MILLION
Complete the final link in the
Beachwalk from South Pointe to the
northern boundary of the city by
extending the Beachwalk from 79th
to 87th Street.
PARKS, RECREATIONAL, AND CULTURAL FACILITIES
GENERAL OBLIGATION BOND
WWW.GOMB 2018 .COM .................
PUBLIC INFORMATION PROGRAM | CITY OF MIAMI BEACH
PRODUCED & PRINTED BY TROPICOLOR PRINT STUDIO | MIAMI BEACHImplement improvements
to park located at 159 Palm
Avenue, including playground
replacement and quick release
shade structure.
PALM ISLAND PARK#14
$231,000
NORTH SHORE PARK &
YOUTH CENTER
$5.7 MILLION
#13
Improve North Shore Park and Youth
Center located at 501 72nd Street,
including: addition of two baseball
fields, emergency generator, playground
replacement, baseball field conversion to
artificial turf and lighting upgrades, roof
replacement, new walking/jogging path,
and security cameras.
Develop new park at 2795 Prairie
Avenue, with elements such as: lake,
overlooks, and amphitheater; tennis
courts; playground; vita course & trail
system; environmental remediation;
and resiliency components.
PAR 3/COMMUNITY
PARK #15
$15.7 MILLION
Implement various improvements
to park located at 45th Street
and Pine Tree Drive, including:
kayak launch renovation/
replacement, sidewalk
improvements, tree planting, and
fencing replacement.
PINETREE PARK#16
$700,000
PARKS, RECREATIONAL, AND CULTURAL FACILITIES
GENERAL OBLIGATION BOND
WWW.GOMB 2018 .COM .................
PUBLIC INFORMATION PROGRAM | CITY OF MIAMI BEACH
PRODUCED & PRINTED BY TROPICOLOR PRINT STUDIO | MIAMI BEACHImplement various baseball
facility improvements to park
located at 4301 North Meridian
Avenue, including new dugouts,
irrigation, and fencing.
POLO PARK SCOTT RAKOW YOUTH CENTER#17 #18
$5.1 MILLION
Improve Scott Rakow Youth Center
located at 2700 Sheridan, including:
roof replacement, renovations to
pool facilities, basketball floor
replacement, window replacements,
emergency generator, HVAC
replacement, and security cameras.
Improve public amenities for
park located at 400 17th Street,
including a permanent restroom/
storage facility and the upgrade of
projectors, cameras, and servers to
4K ultra-high definition resolution
to enhance the delivery of free
cultural activities.
SOUNDSCAPE PARK#19
$4.5 MILLION
$500,000
Implement various improve-
ments to park located at South
Pointe Drive and Washington
Avenue, including playground
replacement, restroom
renovation, and tree planting.
SOUTH POINTE PARK#20
$480,000
PARKS, RECREATIONAL, AND CULTURAL FACILITIES
GENERAL OBLIGATION BOND
WWW.GOMB 2018 .COM .................
PUBLIC INFORMATION PROGRAM | CITY OF MIAMI BEACH
PRODUCED & PRINTED BY TROPICOLOR PRINT STUDIO | MIAMI BEACHImplement various improvements
to park located at 8440
Hawthorne Avenue, including
fence replacement and new paint
and flooring to building and
restrooms.
STILLWATER PARK TATUM PARK#21 #22
$145,000 $840,000
Complete various improvements
to the park located at 8050
Byron Avenue, including
addition of a water playground
structure, replacement of
restrooms, and fence
replacement.
Provide a continuous pedestrian
path along Biscayne Bay from
Government Cut to Lincoln Road,
by connecting the gaps in the
existing public Baywalk, including
pedestrian bridge connection over
5th Street.
BAYWALK#23
$15 MILLION
Construct on-grade
pedestrian walkway and
demolish the existing
wooden boardwalk between
23rd Street to 45th Street.
MIDDLE BEACH
BEACHWALK
$4.5 MILLION
#24
PARKS, RECREATIONAL, AND CULTURAL FACILITIES
GENERAL OBLIGATION BOND
WWW.GOMB 2018 .COM .................
PUBLIC INFORMATION PROGRAM | CITY OF MIAMI BEACH
PRODUCED & PRINTED BY TROPICOLOR PRINT STUDIO | MIAMI BEACHLeverage grant funding from
NOAA and the Florida Inland
Navigation District for dredging of
waterways, removal of invasives
along shorelines, and permitting/
trimming of vegetation impacting
navigation.
WATERWAY RESTORATION#25
$6 MILLION
Replace roofs to avoid water
intrusion and other negative
impacts at cultural facilities,
including the Bass Museum,
Miami City Ballet, and Colony
Theater.
ROOF REPLACEMENT FOR
CULTURAL FACILITIES#26
$3 MILLION
Reconstruct and restore log
cabin for community use
previously located at 8128
Collins Avenue.
LOG CABIN
RECONSTRUCTION#27
$1.1 MILLION
ART DECO
MUSEUM EXPANSION#28
$2 MILLION
Expand the Art Deco Museum at
1001 Ocean Drive, to build and
curate a flexible space capable of
accommodating different configurations
for the permanent collection and
temporary exhibits.
PARKS, RECREATIONAL, AND CULTURAL FACILITIES
GENERAL OBLIGATION BOND
WWW.GOMB 2018 .COM .................
PUBLIC INFORMATION PROGRAM | CITY OF MIAMI BEACH
PRODUCED & PRINTED BY TROPICOLOR PRINT STUDIO | MIAMI BEACHCreate cohesive and vibrant parks and/
or recreational space as part of the
redevelopment of city-owned property
known as the “West Lots” consisting of
8 blocks located in North Beach on the
west side of Collins Avenue across from
North Beach Oceanside Park.
Enhance the temporary skate
park located on Collins Avenue
between 82nd and 83rd Street
by adding an all-wheels track
and other additional park
elements.
WEST LOTS
REDEVELOPMENT
SKATE PARK
IMPROVEMENTS
$5 MILLION $750,000
#29 #30
DO YOU WANT YOUR CITY TO INVEST
IN PUBLIC IMPROVEMENTS?