R7L Baywalk ConnectorPedestrian Baywalk Connector Bridge 5th Street Pedestrian Bridge Baywalk Status •Completed: 61% •Design/Permitting or Under Construction: 24% •GO Bond Funded: 15% Pending Sections •GO Bond Tranche 1: 4% 5th Street Pedestrian Bridge •GO Bond Tranche 3: 11% South Bay Club, 800 West Ave Bayview Terrace, 1228 West Ave Bay Garden Manor, 1250 West Ave 5th Street Bridge Tranche 1 GO Bond Tranche 3 Baywalk Status →Completed: 61% →Design/Permitting or Under Construction: 24% →GO Bond Funded: 15% Pending Sections →GO Bond Tranche 1: 4% Pedestrian Baywalk Connector Bridge →GO Bond Tranche 3: 11% South Bay Club, 800 West Ave Bayview Terrace, 1228 West Ave Bay Garden Manor, 1250 West Ave Pedestrian Baywalk Connector Bridge General Obligation Bond April, 2018 →G.O. Bond workshop where the list of projects were reviewed and prioritized May, 2018 →Mayor Dan Gelber enacted a Mayor’s G.O. Bond Advisory Panel July, 2018 →The Mayor’s G.O. Bond Advisory Panel shared its recommendations to the City Commission →Final project list and costs approved by the Mayor and City Commission November, 2018 →Residents voted to pass all 3 referendum ballot items related to the G.O. Bond Program (69% Approval) May, 2019 →Mayor and City Commission authorized the issuance of the first tranche of G.O. Bonds, including the Bridge Project Pedestrian Baywalk Connector Bridge Development Agreement December, 2018 →City Commission approved, subsequent to second reading/public hearing, the Development Agreement January, 2019 →Development Agreement was executed, and provided that the City and the Developer exercise diligent, good-faith efforts to negotiate and draft terms for the development, design and or construction of the pedestrian bridge May, 2019 →Design concept presented to City Commission for endorsement and submittal to Design Review Board Development Agreement April, 2018 →G.O. Bond workshop where the list of projects were reviewed and prioritized May, 2018 →Mayor Dan Gelber enacted a Mayor’s G.O. Bond Advisory Panel July, 2018 →The Mayor’s G.O. Bond Advisory Panel shared its recommendations to the City Commission →Final project list and costs approved by the Mayor and City Commission November, 2018 →Residents voted to pass all 3 referendum ballot items related to the G.O. Bond Program (69% Approval) May, 2019 →Mayor and City Commission authorized the issuance of the first tranche of G.O. Bonds, including the Bridge Project Pedestrian Baywalk Connector Bridge Artist’s conceptual rendering. See disclaimers page. Pedestrian Baywalk Connector Bridge Pedestrian Baywalk Connector Bridge 3 Master Site Plan 4 Baywalk Pedestrian Access Plans 5 Prior Design Concepts 6 Design Considerations 12 Construction Sequencing 19 Table of Contents See disclaimers page. Pedestrian Baywalk Connector Bridge Creating a Gateway to Miami Beach →A pedestrian bridge will connect the South of Fifth and West Avenue neighborhoods and provide pedestrian waterfront access for residents of Miami Beach. →Planning to build by December 2019 in time for Art Basel. Pedestrian Baywalk Connector Bridge Artist’s conceptual rendering. See disclaimers page. Master Site Plan See disclaimers page. PEDESTRIAN BAYWALKCONNECTOR BRIDGESCOPE OF WORK Baywalk Pedestrian Access Plans See disclaimers page. 10 FT MIN. SETBACKFROM PROPOSEDELEVATED WALKWAY 10 FT MIN. SETBACKFROM PROPOSEDELEVATED WALKWAY CL CL CL CL C L C L CL C L C L CL CL R E S I . / F I R E E L E V . R E S I . E L E V . R E S I . E L E V . P R I V A T E E L E V . P R I V A T E E L E V . P R I V A T E E L E V . S E R V ./ F I R E E L E V .S E R V ./ F I R E E L E V . GA T E GA T E 3 3 3 7 2 9 4 8 4 6 4 2 4 1 1 0 2 8 2 5 2 6 2 7 2 4 2 2 2 3 2 1 1 8 1 9 2 0 3 9 4 0 1 7 3 8 3 2 3 6 3 5 3 4 3 0 4 9 3 1 5 0 4 5 4 3 4 7 1 6 4 4 1 5 1 3 1 4 1 2 0 1 1 1 0 3 0 4 0 2 0 6 0 7 0 5 6 4 5 8 5 7 5 6 5 5 5 4 5 3 5 2 5 1 6 3 6 2 6 1 6 0 5 9 0 8 0 9 2 0 2 2 2 3 292824 37 04 03050607 02 01 1 5 1 6 1 7 1 8 1 9 2 1 31 353433323026 362725 38 716970 7268656766 73 74 75 76 58 57596061626364 56 55 54 53 09111410 081312 VANACCESSIBLE 2'-0" T Y P. muscle2 V A L E T E L E V . E L E C . V E H I C L E S V A L E T P A R K I N G 2 2 ' - 6 " 1 8 ' - 0 " 2 2 ' - 6 " 23'-0" 8'-6" 19'-0" 2 '-0 " 1 1'-0" 2 2'-0" 2 2 '-0 " 5 '-0 " 1 2 5 '-0 " 2 2'-0" 2 2'-0" 2 2'- 0" 2 2'-0" 2 2 '-0 " 1 1'-0" 1 0'-0" 2 2 '-0 " 1 1 '-0 " 22'-0" 2 5 ' - 0 " 1 2'-0" 1 2'-0" 4 0 '-0 " 2 2 '-0 " 9 '-0 " 1 8'-0"2 2 '-0 " 2 2 '-0 " 1 1 '-0 " 1:12SLOPE RAMPUP 2'-6" RAMP UP6" AT 5% D N5 '-0 " 1:12SLOPE EXITINGMOTORCYCLEPARKINGEXISTING STREET PARKING 3 SPACES 2 SPACES EXISTING STREETPARKING 3 SPACES CONTROL BOX LIFT STATION D N4 '-0 " D N4 '-0 " RAMPUP 2'-6"1:12SLOPE RAMPUP 2'-6"RAMPUP 2'-6"1:12SLOPE RAMPUP 2'-6"RAMPUP 2'-6"1:12SLOPE RAMPUP 2'-6"RAMPUP 2'-6"1:12SLOPE RAMPUP 2'-6"RAMPUP 2'-6"RAMPUP 2'-6"RAMPUP 2'-6"RAMPUP 2'-6"1:12SLOPE R A M P D N 3 '-6 " 6 %S L O P E R A M P D N 3 '-6 " 12 % S L O P E 6 % S L O P E 6 %S L O P E 1 2 %S L O P E 6 %S L O P E 2 0 S H O R T -T E R M B I C Y C L E S P A C E S (R E S I D E N T I A L ) RAMP UP6" AT 5% U P1'-0" 1:12SLO P E P L A N T E R RAMP UP6" AT 5%RAMP UP6" AT 5% 14 SHORT-TERM BICYCLE SPACES (RESIDENTIAL) 10'-6" 10'-0" 16'-0" 10'-6" 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 27 2823242526 12'-6" 10'-0" 12'-0" 9'-0" 10'-0" 1 0 '-0 " 12'-6" 12'-6" 10'-0" 36'-0" 2 '-0 " 1 0 '-0 " 1 0 '-0 " 1 0 '-0 " 12'-0" 7'-4" 11'-0" 11'-0" 11'-0" 10'-0" 6 1 '-5 " 2 2 '-0 "8'-6" 1 8 '-0 " 29'-5"55'-7" 1 3 '-1 1 " 49'-6" 22'-0" 1 8 '-0 " 1 6 '-0 " 17'-0" 25'-0" 1 2 '-2 " 1 0 '-0 " 7 '-8 " 1 7 '-8 " 1416 001 PED. BRI DGE ACCESS M A I L 5 4 0 S F R E S I D E N T I A L L O B B Y 2 ,1 7 5 S F S I G N A T U R E R E S I D E N T I A L L O B B Y 1 ,5 6 5 S F W A T E R F E A T U R E W A L L / S I G N A G E P A C K . 4 1 5 S F R A M P U P 5'- 0" R E S I D E N T I A L D R O P -O F F STREET ELEV. STREET ELEV. +8'-6" NGVD STREET ELEV. +4'-6" NGVD STREET ELEV. PRIVATETERRACE STREET ELEV. +3'-6" NGVDSTREET ELEV. +3'-6" NGVD +3'-3" NGVD STREET ELEV. +5'-5" NGVD STREET ELEV. +4'-9" NGVD +6'-0" NGVD STREET ELEV. +5'-0" NGVD STREET ELEV. +5'-6" NGVD STREET ELEV. +5 '-6" NGVD STREET ELEV. +5'-10" NGVD STREET ELEV. +3'-0" NGVD STREET ELEV. +3'-0" NGVD STREET ELEV. +3'-9" NGVD STREET ELEV. +4'-0" NGVD STREET ELEV. +3'-6" NGVD STREET ELEV. +4'-0" NGVD C O M M . L O A D I N G Z O N E (1 0 ' x 2 0 ') STREET ELEV. +5'-0" NGVD STREET ELEV. +5'-0" NGVDSTREET ELEV. +5'-0" NGVDSTREET ELEV. +5'-6" NGVD C O M M . L O A D I N G / C O M M . L O A D I N G Z O N E (1 2 ' x 3 5 ') FL ORI DI AN PARKI NG 21,820 SF 76 SPACES +3'-6" NGVD +5'-6" NGVD +6'-0" NGVD +5'-6" NGVD +5'-6" NGVD +4'-6" NGVD +4'-0" NGVD +5 '-6 " N G V D +8'-6" NGVD +5'-0" NGVD P A C K . 2 4 5 S F R A M P U P5'-0" R A M P D N 4'- 6" 5 .0 % S L O P E LOADING BAY(10' x 20') R E S I . L O A D I N G B A Y (1 0 ' x 2 0 ') M A I L 3 8 5 S F GUARDHOUSE L O B B Y L E V . +9 '-0 " N G V D +9 '-0 " N G V D +8 '-6 " N G V D L O B B Y L E V . +9 '-0 " N G V D S I G N A T U R E R E S I D E N T I A L D R O P -O F F 5 .6 % S L O P E +1 4 '-0 " N G V D +8 '-0 " N G V D M E P 1 ,2 0 0 S F 9 S P A C E S O N R A M P T O B A S E M E N T G A T E P A R K . L E V . 0 1 +9 '-0 " N G V D O P E N T O B E L O W M E P 7 0 0 S F +8 '-0 " N G V D +8 '-6 " N G V D +8'-6" NGVD SIDEWALK ELEV. +2'-0" NGVD SIDEWALK ELEV. +2'-4" NGVD 1 6 F T W I D E F I R E T R U C K A C C E S S L A N E STREET ELEV. +8'-6" NGVD OERHEAD ROLLING DOOR BACKFLOW PREVENTER /SIAMESE CONNECTION G A T E GA TE GA TE LOADING AREA 6,375 SF R E S I . L O A D I N G B A Y (1 0 ' x 2 0 ')R E S I . L O A D I N G B A Y (1 0 ' x 2 0 ') R E S I . L O A D I N G B A Y (1 0 ' x 2 0 ') WALKWAYABOVE R E S I . L O A D I N G B A Y (1 0 ' x 2 0 ') T R A S H 3 1 0 S F S E R V . T R A S H B O HB.R M 1 4 5 S F F .C .C 2 0 0 S F +9 '-0 " N G V D +4'-0" NGVD +4'-0" NGVD +9'-0" NGVD +9 '-0 " N G V D +4'-0" NGVD +8 '-0 " N G V D S I G N A G E SIGNA G E STREET ELEV. +6'-0" NGVD +8'-6" NGVD +9 '-0 " N G V D +8 '-6 " N G V D +9 '-0 " N G V D +9 '-0 " N G V D P L A N T E R P L A N T E R P L A N T E R P L A N T E R P L A N T E R PLANTER PLANTER PLANTER ELEVATED WALKWAYABOVE ELEVATED WALKWAYABOVE E L E V . W A L K W A Y A B O V E 6 S H O R T -T E R M B I C Y C L E S P A C E S (R E T A I L ) P A R K I N G L E V E L 0 1 6 4 S P A C E S (I N C L U D I N G 3 0 V A L E T S P A C E S ) PLANTER PLANTER +7'-0" NGVD L O A D I N G B A Y S F O R L A R G E R T R U C K S (1 2 ' x 4 0 ') S E R V . +8'-6" NGVD STREET ELEV. STREET ELEV. +3'-0" NGVD +3'-6" NGVD 10'-0"+3'-6" NGVD +3'-0" NGVD STREET ELEV. +3'-6" NGVD STREET ELEV. +8'-6" NGVD DN 5'-6"OUTDOORTERRACE OUTDOOR TERRACE +3'-6" NGVD C R O S S -B L O C K P A S S A G E GROUND LEV. +9'-0" NGVD RETAI L 1 3,410 NSF GROUND LEV. +9'-0" NGVD FLEX PLAZA (I NCLUDES 28 PARKI NG SPACES) +8'-6" NGVDVANACCESSIBLE +9'-0" NGVD VALETSTAND +8'-6" NGVD FP&L TRANSFORMERPAD (600 ALTON SITE) FP&L TRANSFORMER PAD(PARK SITE) BACKFLOWPREVENTER GREASETRAPS GROUND LEV. +9'-0" NGVD STAI R WALKWAYABOVE RETAIL 23,040 SF RAMP UP 5'-0" 7 % S L O P E 1 4 % S L O P E 7 % S L O P E SIGNAGE GROUND LEV. +9'-0" NGVD +9'-0" NGVD PLANTER PLANTER VANACCESSIBLE 1 8 S H O R T -T E R M B I C Y C L E S P A C E S (R E T A I L /F &B ) PLANTER PLANTER+9'-0" NGVD ELEC /TELECOM. 210 SF COMM.TRASH RM90 SF ELEV. CONTROL 42" H. GLASS RAILING 42" H. GLASS RAILING E LEV. EL EV. UP 24'-0"F U T U R E C I T Y P A R K R E S T R O O M S (FI NAL LOCATI ON TBD SUBJECT TO DRB OR DIRECTION FROM BOARD) 1 0 S H O R T -T E R M B I C Y C L E S P A C E S (R E T A I L ) PLANTER C O M M . T R A S H L O A D I N G Z O N E (1 2 ' x 3 5 ') PLANTING SCREENING(REFER TO LANDSCAPE DRAWINGS) +8'-6" NGVD O N L Y O N L Y UP UP ICON SOUTH BEACH BENTLEY BAY THE FLORIDIAN MIAMI BEACHBISCAYNE B AY B I S C A Y N E B A Y 5 T H S T R E E T M A C A R T H U R C A U S E W A Y E A S T B O U N D F L Y O V E R R A M P ALTON ROAD W E S T A V E N U E W 6 T H S T R E E T BENTLEY BAY RAMP DOWN BAYWALK BAYWA L K BAYWALK GROUND LEVEL SITE PLAN LEVEL 2 SITE PLAN DN DN 2 2 '-0 " 2 2'-0" 1 8'-0" 9 '-0 " 2 2'-0" 2 2 '-0 " 1:12SLOPE1:12SLOPE RAMPUP 2'-6"1:12SLOPE RAMPUP 2'-6"RAMPUP 2'-6"1:12SLOPE RAMPUP 2'-6"RAMPUP 2'-6"1:12SLOPE RAMPUP 2'-6"RAMPUP 2'-6"1:12SLOPE RAMPUP 2'-6"RAMPUP 2'-6"RAMPUP 2'-6"RAMPUP 2'-6"RAMPUP 2'-6"1:12SLOPERAMPUP 2'-6" RAMPUP 2'-6" 1:12SLOPE 1:12SLO P E RAMPUP 2'-6" RAMPUP 2'-6" 1 :1 2 S L O P E 1 :1 2 S L O P E 1:12SLO P E RAMPUP 2'-0" B O H 1 :1 2 S L O P E RAMPUP 2'-6" RAMPUP 2'-6" 1 :1 2 S L O P E 15'-0"10'-0" 5'-0" 11'-0" 39 ' - 3 " 172' 10'-0" 55'-6"91'-7"25'-0" 17'-8" OPEN TO BEL OW WALKWAY ELEV. +33'-0" NGVD E L E V . L O B B Y S Q U A S H C O U R T (1 8 '-6 " c l e a r h e i g h t ) 6 7 2 S F L E V E L 0 2 +3 3 '-0 " N G V D L E V E L 0 2 +3 3 '-0 " N G V D 5 .6 % S L O P E R A M P U P 5'- 0" P A R K . L E V . 0 3 +2 9 '-0 " N G V D +3 4 '-0 " N G V D V A N A C C E S S I B L E +3 3 '-0 " N G V D E L E V . L O B B Y O U T D O O R M O V I E 1 ,1 7 5 S F O U T D O O R L O U N G E 1 ,2 6 0 S F R A C K E T C L U B 1 ,2 9 0 S F S Q U A S H C O U R T (1 8 '-6 " c l e a r h e i g h t ) 6 7 2 S F 2 9 S P A C E S O N R A M P T O L E V E L 0 2 R A M P U P5'-0" R A M P D N 5'-0" 5 .6 % S L O P E P A R K I N G L E V E L 0 3 1 3 0 S P A C E S (I N C L U D I N G 4 8 V A L E T S P A C E S ) O U T D O O R K I D S R O O M 6 5 0 S F WALKWAY ELEV. +33'-0" NGVD WALKWAY ELEV. +33'-0" NGVD WALKWAY ELEV. +33'-0" NGVD WALKWAY ELEV. +26'-0" NGVD LOOK OUTAREA PLANTER GATE P R I V A T E O U T D O O R T E R R A C E G A T E PLANTER PLANTER PLANTER V A N A C C E S S I B L E OPEN TO BEL OW 7'-0" GATE WALKWAY ELEV. OUTDOORSEATING(48 SEATS) +33'-0" NGVD OUTDOOR SEATING(48 SEATS) STAIR WALKWAY ELEV. +33'-0" NGVD ROOFABOVE WALKWAY ELEV. +33'-0" NGVD WALKWAY ELEV. +33'-0" NGVD PLANTER PLANTER PLANTER (F&B COMPONENTS WITH INDIVIDUAL OCCUPANCY UNDER 299 OCCUPANTS) RESTROOMRESTROOMF&B 1 2,180 SF (96 SEATS) F &B 2 1,090 SF (48 SEATS) F&B 3 1,110 SF (50 SEATS) B.O.H.1,400 SF ELEV. ELEV. CL CL CL CL C L C L CL C L C L CL CL 10 FT MIN. SETBACKFROM PROPOSEDELEVATED WALKWAY 10 FT MIN. SETBACKFROM PROPOSEDELEVATED WALKWAY V A L E T E L E V . CL 6 '-0" 5 '-0 " 5 '-0" R E S I . / F I R E E L E V . S T A I R PR E S S . R E S I . E L E V . R E S I . E L E V . P R I V A T E E L E V . P R I V A T E E L E V . P R I V A T E E L E V . B .O .H M E C H . S E R V ./ F I R E E L E V .S E R V ./ F I R E E L E V . E L E C . T 1 :1 2 S L O P E 1 :1 2 S L O P E R A M P U P 4 '-0 " 2'-0" T Y P. 6 4 6 3 6 2 6 1 6 0 5 9 5 8 5 7 5 6 7 8 7 7 7 6 7 3 7 2 7 1 7 0 6 9 6 8 1 0 1 9 7 9 6 9 5 8 4 8 3 8 2 9 1 1 2 4 1 2 3 1 2 2 1 2 1 1 2 0 1 1 9 1 1 8 1 1 7 1 2 8 1 2 7 1 2 6 1 2 5 1 1 3 1 1 2 1 1 1 1 1 0 1 0 9 1 0 8 0 4 0 5 0 6 0 7 0 8 0 9 6 7 6 6 6 5 8 1 8 0 7 994 9 3 9 2 1 0 0 9 9 9 8 1 1 6 1 1 5 1 1 4 0 1 0 2 0 3 1 3 1 4 1 5 1 6 1 7 1 0 1 1 1 2 2 1 2 2 2 4 2 5 1 8 1 9 2 0 2 6 2 7 2 8 2 9 7 5 7 4 8 7 8 6 8 5 9 0 8 9 8 8 1 2 9 1 3 0 3 6 3 7 3 8 3 3 3 2 1 0 4 1 0 5 53 4 6 4 7 4 852 5 1 5 0 4 9 3 9 4 3 4 0 4 4 4 2 4 1 3 1 3 0 1 0 6 1 0 7 3 5 3 4 1 0 2 1 0 3 5 5 4 5 2 3 54 1416 001 11'-0" 11'-0" E L E C . V E H I C L E S V A L E T P A R K I N G V A L E T P A R K I N G V A L E T P A R K I N G V A L E T P A R K I N G ICON SOUTH BEACH BENTLEY BAY THE FLORIDIAN MIAMI BEACHBISCAYNE BAY B I S C A Y N E B A Y 5 T H S T R E E T M A C A R T H U R C A U S E W A Y E A S T B O U N D F L Y O V E R R A M P ALTON ROAD BENTLEY BAY BAYWALK BAYWA L K BAYWALK RAMP DOWN TO LEVEL 1 10 FT MIN. SETBACKFROM PROPOSEDELEVATED WALKWAY 10 FT MIN. SETBACKFROM PROPOSEDELEVATED WALKWAY CL CL CL CL C L C L CL C L C L CL CL R E S I . / F I R E E L E V . R E S I . E L E V . R E S I . E L E V . P R I V A T E E L E V . P R I V A T E E L E V . P R I V A T E E L E V . S E R V ./ F I R E E L E V .S E R V ./ F I R E E L E V . GA T E GA T E 3 3 3 7 2 9 4 8 4 6 4 2 4 1 1 0 2 8 2 5 2 6 2 7 2 4 2 2 2 3 2 1 1 8 1 9 2 0 3 9 4 0 1 7 3 8 3 2 3 6 3 5 3 4 3 0 4 9 3 1 5 0 4 5 4 3 4 7 1 6 4 4 1 5 1 3 1 4 1 2 0 1 1 1 0 3 0 4 0 2 0 6 0 7 0 5 6 4 5 8 5 7 5 6 5 5 5 4 5 3 5 2 5 1 6 3 6 2 6 1 6 0 5 9 0 8 0 9 2 0 2 2 2 3 292824 37 04 03050607 02 01 1 5 1 6 1 7 1 8 1 9 2 1 31 353433323026 362725 38 716970 7268656766 73 74 75 76 58 57596061626364 56 55 54 53 09111410 081312 VANACCESSIBLE 2'-0" T Y P. muscle2 V A L E T E L E V . E L E C . V E H I C L E S V A L E T P A R K I N G 2 2 ' - 6 " 18'-0 " 2 2 ' - 6 " 23'-0" 8'-6" 19'-0" 2 '-0 " 1 1'-0" 2 2'-0" 2 2 '-0 " 5 '-0 " 1 2 5 '-0 " 2 2'-0" 2 2'-0" 2 2'-0" 2 2'-0" 2 2 '-0 " 1 1'-0" 1 0'-0" 2 2 '-0 " 1 1 '-0 " 22'-0" 2 5 ' - 0 " 1 2'-0" 1 2'-0" 4 0 '-0 " 2 2 '-0 " 9 '-0 " 1 8'-0"2 2 '-0 " 2 2 '-0 " 1 1 '-0 " 1:12SLOPE RAMPUP 2'-6" RAMP UP6" AT 5% D N5 '-0 " 1:12SLOPE EXITINGMOTORCYCLEPARKINGEXISTING STREET PARKING3 SPACES 2 SPACES EXISTINGSTREETPARKING3 SPACES CONTROL BOX LIFTSTATION D N4 '-0 " D N4 '-0 " RAMPUP 2'-6"1:12SLOPE RAMPUP 2'-6"RAMPUP 2'-6"1:12SLOPE RAMPUP 2'-6"RAMPUP 2'-6"1:12SLOPE RAMPUP 2'-6"RAMPUP 2'-6"1:12SLOPE RAMPUP 2'-6"RAMPUP 2'-6"RAMPUP 2'-6"RAMPUP 2'-6"RAMPUP 2'-6"1:12SLOPE R A M P D N 3 '-6 " 6 %S L O P E R A M P D N 3 '-6 " 1 2 %S L O P E 6 % S L O P E 6 %S L O P E 12 % S L O P E 6 %S L O P E 2 0 S H O R T -T E R M B I C Y C L E S P A C E S (R E S I D E N T I A L ) RAMP UP6" AT 5% U P 1'-0" 1:12SL O P E P L A N T E R RAMP UP6" AT 5%RAMP UP6" AT 5% 14 SHORT-TERM BICYCLE SPACES (RESIDENTIAL) 10'-6" 10'-0" 16'-0" 10'-6" 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 27 2823242526 12'-6" 10'-0" 12'-0" 9'-0" 10'-0" 1 0 '-0 " 12'-6" 12'-6" 10'-0" 36'-0" 2 '-0 " 1 0 '-0 " 1 0 '-0 " 1 0 '-0 " 12'-0" 7'-4" 11'-0" 11'-0" 11'-0" 10'-0" 6 1 '-5 " 2 2 '-0 " 8'-6" 1 8 '-0 " 29'-5"55'-7" 1 3 '-1 1 " 49'-6" 22'-0" 1 8 '-0 " 1 6 '-0 " 17'-0" 25'-0" 1 2 '-2 " 1 0 '-0 " 7 '-8 " 1 7 '-8 " 1416 001 PED. BRI DGE ACCESS M A I L 5 4 0 S F R E S I D E N T I A L L O B B Y 2 ,1 7 5 S F S I G N A T U R E R E S I D E N T I A L L O B B Y 1 ,5 6 5 S F W A T E R F E A T U R E W A L L / S I G N A G E P A C K . 4 1 5 S F R A M P U P 5'- 0" R E S I D E N T I A L D R O P -O F F STREET ELEV. STREET ELEV. +8'-6" NGVD STREET ELEV. +4'-6" NGVD STREET ELEV. PRIVATETERRACE STREET ELEV. +3'-6" NGVDSTREET ELEV. +3'-6" NGVD +3'-3" NGVD STREET ELEV. +5'-5" NGVD STREET ELEV.+4'-9" NGVD +6'-0" NGVD STREET ELEV. +5'-0" NGVD STREET ELEV. +5'-6" NGVD STRE ET ELEV . +5'-6" NGV D STREET ELEV. +5'-10" NGVD STREET ELEV. +3'-0" NGVD STREET ELEV. +3'-0" NGVD STREET ELEV. +3'-9" NGVD STREET ELEV. +4'-0" NGVD STREET ELEV. +3'-6" NGVD STREET ELEV. +4'-0" NGVD C O M M . L O A D I N G Z O N E (1 0 ' x 2 0 ') STREET ELEV.+5'-0" NGVD STREET ELEV.+5'-0" NGVDSTREET ELEV.+5'-0" NGVDSTREET ELEV.+5'-6" NGVD C O M M . L O A D I N G / C O M M . L O A D I N G Z O N E (1 2 ' x 3 5 ') FL ORI DI AN PARKI NG 21,820 SF 76 SPACES +3'-6" NGVD +5'-6" NGVD +6'-0" NGVD +5'-6" NGVD +5'-6" NGVD +4'-6" NGVD +4'-0" NGVD +5 '-6 " N G V D +8'-6" NGVD +5'-0" NGVD P A C K . 2 4 5 S F R A M P U P5'-0" R A M P D N 4'-6" 5 .0 % S L O P E LOADING BAY(10' x 20') R E S I . L O A D I N G B A Y (1 0 ' x 2 0 ') M A I L 3 8 5 S F GUARDHOUSE L O B B Y L E V . +9 '-0 " N G V D +9 '-0 " N G V D +8 '-6 " N G V D L O B B Y L E V . +9 '-0 " N G V D S I G N A T U R E R E S I D E N T I A L D R O P -O F F 5 .6 % S L O P E +1 4 '-0 " N G V D +8 '-0 " N G V D M E P 1 ,2 0 0 S F 9 S P A C E S O N R A M P T O B A S E M E N T G A T E P A R K . L E V . 0 1 +9 '-0 " N G V D O P E N T O B E L O W M E P 7 0 0 S F +8 '-0 " N G V D +8 '-6 " N G V D +8'-6" NGVD SIDEWALK ELEV. +2'-0" NGVD SIDEWALK ELEV. +2'-4" NGVD 1 6 F T W I D E F I R E T R U C K A C C E S S L A N E STREET ELEV. +8'-6" NGVD OERHEAD ROLLI NG DOOR BACKFLOW PREVENTER /SIAMESE CONNECTION G A T E G A TE G ATE LOADING AREA 6,375 SF R E S I . L O A D I N G B A Y (1 0 ' x 2 0 ')R E S I . L O A D I N G B A Y (1 0 ' x 2 0 ') R E S I . L O A D I N G B A Y (1 0 ' x 2 0 ') WALKWAYABOVE R E S I . L O A D I N G B A Y (1 0 ' x 2 0 ') T R A S H 3 1 0 S F S E R V . T R A S H B O HB.R M 1 4 5 S F F .C .C 2 0 0 S F +9 '-0 " N G V D +4'-0" NGVD +4'-0" NGVD +9'-0" NGVD +9 '-0 " N G V D +4'-0" NGVD +8 '-0 " N G V D S I G N A G E SIG NAG E STREET ELEV. +6'-0" NGVD +8'-6" NGVD +9 '-0 " N G V D +8 '-6 " N G V D +9 '-0 " N G V D +9 '-0 " N G V D P L A N T E R P L A N T E R P L A N T E R P L A N T E R P L A N T E R PLANTER PLANTER PLANTER ELEVATED WALKWAYABOVE ELEVATED WALKWAYABOVE E L E V . W A L K W A Y A B O V E 6 S H O R T -T E R M B I C Y C L E S P A C E S (R E T A I L ) P A R K I N G L E V E L 0 1 6 4 S P A C E S (I N C L U D I N G 3 0 V A L E T S P A C E S ) PLANTER PLANTER +7'-0" NGVD L O A D I N G B A Y S F O R L A R G E R T R U C K S (1 2 ' x 4 0 ') S E R V . +8'-6" NGVD STREET ELEV. STREET ELEV. +3'-0" NGVD +3'-6" NGVD 10'-0"+3'-6" NGVD +3'-0" NGVD STREET ELEV. +3'-6" NGVD STREET ELEV. +8'-6" NGVD DN 5'-6"OUTDOORTERRACE OUTDOORTERRACE +3'-6" NGVD C R O S S - B L O C K P A S S A G E GROUND LEV. +9'-0" NGVD RETAI L 1 3,410 NSF GROUND LEV. +9'-0" NGVD FLEX PLAZA (I NCLUDES 28 PARKI NG SPACES) +8'-6" NGVDVANACCESSIBLE +9'-0" NGVD VALETSTAND +8'-6" NGVD FP&L TRANSFORMERPAD (600 ALTON SITE) FP&L TRANSFORMER PAD(PARK SITE) BACKFLOWPREVENTER GREASETRAPS GROUND LEV. +9'-0" NGVD STAIR WALKWAYABOVE RETAI L 23,040 SF RAMPUP 5'-0" 7 % S L O P E 1 4 % S L O P E 7 % S L O P E SIGNAGE GROUND LEV. +9'-0" NGVD +9'-0" NGVD PLANTER PLANTER VANACCESSIBLE 1 8 S H O R T -T E R M B I C Y C L E S P A C E S (R E T A I L /F &B ) PLANTER PLANTER+9'-0" NGVD ELEC /TELECOM. 210 SF COMM.TRASH RM90 SF ELEV. CONTROL 42" H. GLASS RAILING 42" H. GLASS RAILING EL EV. E LEV. UP 24'-0"F U T U R E C I T Y P A R K R E S T R O O M S (FINAL LOCATI ON TBD SUBJECT TO DRB ORDIRECTION FROM BOARD) 1 0 S H O R T -T E R M B I C Y C L E S P A C E S (R E T A I L ) PLANTER C O M M . T R A S H L O A D I N G Z O N E (1 2 ' x 3 5 ') PLANTING SCREENING(REFER TO LANDSCAPE DRAWINGS) +8'-6" NGVD O N L Y O N L Y UP UP ICON SOUTH BEACH BENTLEY BAY THE FLORIDIAN MIAMI BEACHBISCAYNE BA YBISCAYNE B A Y 5 T H S T R E E T M A C A R T H U R C A U S E W A Y E A S T B O U N D F L Y O V E R R A M P ALTON ROAD WE S T A V E N U E W 6 T H S T R E E T BENTLEY BAY RAMP DOWN BAYWALK BAYWA L K BAYWALK GROUND LEVEL SITE PLAN LEVEL 2 SITE PLAN DN DN 2 2 '-0 " 2 2'-0" 1 8'-0" 9 '-0 " 2 2'-0" 2 2 '-0 " 1:12SLOPE1:12SLOPE RAMPUP 2'-6"1:12SLOPE RAMPUP 2'-6"RAMPUP 2'-6"1:12SLOPE RAMPUP 2'-6"RAMPUP 2'-6"1:12SLOPE RAMPUP 2'-6"RAMPUP 2'-6"1:12SLOPE RAMPUP 2'-6"RAMPUP 2'-6"RAMPUP 2'-6"RAMPUP 2'-6"RAMPUP 2'-6"1:12SLOPERAMPUP 2'-6" RAMPUP 2'-6" 1:12SLOPE 1 :12SLOPE RAMPUP 2'-6" RAMPUP 2'-6" 1 :1 2 S L O P E 1 :1 2 S L O P E 1:12S LO PE RAMPUP 2'-0" B O H 1 :1 2 S L O P E RAMPUP 2'-6" RAMPUP 2'-6" 1 :1 2 S L O P E 15'-0"10'-0" 5'-0" 11'-0" 39 ' - 3 " 172' 10'-0" 55'-6"91'-7"25'-0" 17'-8" OPEN TO BELOW WALKWAY ELEV. +33'-0" NGVD E L E V . L O B B Y S Q U A S H C O U R T (1 8 '-6 " c l e a r h e i g h t ) 6 7 2 S F L E V E L 0 2 +3 3 '-0 " N G V D L E V E L 0 2 +3 3 '-0 " N G V D 5 .6 % S L O P E R A M P U P 5'-0" P A R K . L E V . 0 3 +2 9 '-0 " N G V D +3 4 '-0 " N G V D V A N A C C E S S I B L E +3 3 '-0 " N G V D E L E V . L O B B Y O U T D O O R M O V I E 1 ,1 7 5 S F O U T D O O R L O U N G E 1 ,2 6 0 S F R A C K E T C L U B 1 ,2 9 0 S F S Q U A S H C O U R T (1 8 '-6 " c l e a r h e i g h t ) 6 7 2 S F 2 9 S P A C E S O N R A M P T O L E V E L 0 2 R A M P U P5'-0" R A M P D N 5'-0" 5 .6 % S L O P E P A R K I N G L E V E L 0 3 1 3 0 S P A C E S (I N C L U D I N G 4 8 V A L E T S P A C E S ) O U T D O O R K I D S R O O M 6 5 0 S F WALKWAY ELEV. +33'-0" NGVD WALKWAY ELEV. +33'-0" NGVD WALKWAY ELEV. +33'-0" NGVD WALKWAY ELEV. +26'-0" NGVD LOOK OUT AREA PLANTER GATE P R I V A T E O U T D O O R T E R R A C E G A T E PLANTER PLANTER PLANTER V A N A C C E S S I B L E OPEN TO BELOW 7'-0" GATE WALKWAY ELEV. OUTDOOR SEATING(48 SEATS) +33'-0" NGVD OUTDOOR SEATING (48 SEATS) STAIR WALKWAY ELEV. +33'-0" NGVD ROOFABOVE WALKWAY ELEV. +33'-0" NGVD WALKWAY ELEV. +33'-0" NGVD PLANTER PLANTER PLANTER (F&B COMPONENTS WITH INDIVIDUAL OCCUPANCY UNDER 299 OCCUPANTS) RESTROOMRESTROOMF&B 1 2,180 SF (96 SEATS) F&B 21,090 SF (48 SEATS) F &B 31,110 SF (50 SEATS) B.O.H.1,400 SF ELEV. ELEV. CL CL CL CL C L C L CL C L C L CL CL 10 FT MIN. SETBACKFROM PROPOSEDELEVATED WALKWAY 10 FT MIN. SETBACKFROM PROPOSEDELEVATED WALKWAY V A L E T E L E V . CL 6 '-0 " 5 '-0" 5 '-0 " R E S I . / F I R E E L E V . ST A I R P R E S S . R E S I . E L E V . R E S I . E L E V . P R I V A T E E L E V . P R I V A T E E L E V . P R I V A T E E L E V . B .O .H M E C H . S E R V ./ F I R E E L E V .S E R V ./ F I R E E L E V . E L E C . T 1 :1 2 S L O P E 1 :1 2 S L O P E R A M P U P 4 '-0 " 2'-0" T Y P. 6 4 6 3 6 2 6 1 6 0 5 9 5 8 5 7 5 6 7 8 7 7 7 6 7 3 7 2 7 1 7 0 6 9 6 8 1 0 1 9 7 9 6 9 5 8 4 8 3 8 2 9 1 1 2 4 1 2 3 1 2 2 1 2 1 1 2 0 1 1 9 1 1 8 1 1 7 1 2 8 1 2 7 1 2 6 1 2 5 1 1 3 1 1 2 1 1 1 1 1 0 1 0 9 1 0 8 0 4 0 5 0 6 0 7 0 8 0 9 6 7 6 6 6 5 8 1 8 0 7 994 9 3 9 2 1 0 0 9 9 9 8 1 1 6 1 1 5 1 1 4 0 1 0 2 0 3 1 3 1 4 1 5 1 6 1 7 1 0 1 1 1 2 2 1 2 2 2 4 2 5 1 8 1 9 2 0 2 6 2 7 2 8 2 9 7 5 7 4 8 7 8 6 8 5 9 0 8 9 8 8 1 2 9 1 3 0 3 6 3 7 3 8 3 3 3 2 1 0 4 1 0 5 5 3 4 6 4 7 4 852 5 1 5 0 4 9 3 9 4 3 4 0 4 4 4 2 4 1 3 1 3 0 1 0 6 1 0 7 3 5 3 4 1 0 2 1 0 3 5 5 4 5 2 3 54 1416 001 11'-0" 11'-0" E L E C . V E H I C L E S V A L E T P A R K I N G V A L E T P A R K I N G V A L E T P A R K I N G V A L E T P A R K I N G ICON SOUTH BEACH BENTLEY BAY THE FLORIDIAN MIAMI BEACHBISCAYNE B A Y B I S C A Y N E B A Y 5 T H S T R E E T M A C A R T H U R C A U S E W A Y E A S T B O U N D F L Y O V E R R A M P ALTON ROAD BENTLEY BAY BAYWALK BAYWA L K BAYWALK RAMP DOWN TO LEVEL 1 Ground Level Level 2 See disclaimers page. Prior Design Concepts Option 1 N No copies, transmissions, reproductions, or electronic manipulation of any portion of these drawings in whole or in part are to be made without the express written permission of Arquitectonica International. All designs indicated in these drawings are property of Arquitectonica International. All copyrights reserved (c) 2019. The data included in this study is conceptual in nature and will continue to be modified throughout the course of the projects development with the eventual integration of structural, MEP and life safety systems. As these are further refined, the numbers will be adjusted accordingly. 2900 Oak Avenue, Miami, FL 33133 T 305.372.1812 F 305.372.1175 FIRST DRB SUBMITTAL 5TH STREET BAYWALK CONNECTOR BRIDGE MIAMI BEACH, FL 33139 08416 32 64 ft4281632 ftScale: OPTION 1 RENDERING A5-06DATE: 03/18/2019 No copies, transmissions, reproductions, or electronic manipulation of any portion of these drawings in whole or in part are to be made without the express written permission of Arquitectonica International. All designs indicated in these drawings are property of Arquitectonica International. All copyrights reserved (c) 2019. The data included in this study is conceptual in nature and will continue to be modified throughout the course of the projects development with the eventual integration of structural, MEP and life safety systems. As these are further refined, the numbers will be adjusted accordingly. 2900 Oak Avenue, Miami, FL 33133 T 305.372.1812 F 305.372.1175 FIRST DRB SUBMITTAL 5TH STREET BAYWALK CONNECTOR BRIDGE MIAMI BEACH, FL 33139 RENDERING A5-07DATE: 03/18/2019 GRAY BROOM FINISH CONRETE AT WALKWAY, TYP. ALUMINUM FINS WITH POWDER COATED MARINE GRADE PAINT SYSTEM BEYOND, MEET AMA 2605 STANDARD, TYP. COLOR CHANGING PROGRAMMABLE LED LIT LETTERS. FUTURA FONT, TO MATCH CITY OF MIAMI BEACH FONT CONCRETE COLUMN CONCRETE PIER CAP BEAM Prior Design Concepts Option 1 See disclaimers page. 3 3 3 7 4 8 4 6 2 8 2 5 2 6 2 7 2 4 2 2 2 3 3 9 4 0 3 8 3 2 3 6 3 5 3 4 4 9 5 0 4 5 4 3 4 7 4 4 6 4 5 8 5 7 5 6 5 5 5 4 5 3 5 2 5 1 6 3 6 2 6 1 6 0 3 3 3 7 4 8 4 6 2 8 2 5 2 6 2 7 2 4 2 2 2 3 3 9 4 0 3 8 3 2 3 6 3 5 3 4 4 9 5 0 4 5 4 3 4 7 4 4 6 4 5 8 5 7 5 6 5 5 5 4 5 3 5 2 5 1 6 3 6 2 6 1 6 0 A5-11 11 A5-23 A5-121 A5-12 2 (E) BUILDING 500 ALTON PROJECT W E S T A V E N U E 1 CONCRETE COLUMN CONCRETE PIER CAP BEAM ABOVE CONCRETE COLUMN CONCRETE PIER CAP BEAM ABOVE LINE OF WALKWAY ABOVE CONCRETE COLUMNS, TYP. 1 1 6 3 ' - 1 1 " 5 T H S T R E E T (M A C A R T H U R C A U S E W A Y ) E A S T B O U N D F L Y O V E R R A M P W E S T B O U N D E A S T B O U N D 8 . 3 3 % 8 . 2 7 % 8 . 0 9 % 8 . 0 9 % 7.50' 10.00' 12.50' 15.00' LINE OF RAMP ABOVE 1 6 '-0 " W I D E F I R E T R U C K A C C E S S L A N E CONCRETE COLUMN, TYP. UP ALUMINUM FINS GUARDRAIL AT 48" AFF WITH POWDER COATED MARINE GRADE PAINT SYSTEMA, MEET AMA 2605 STANDARD, TYP. NGVD SIDEWALK ELEV. 2'-0" NGVD SIDEWALK ELEV. 2'-4" NGVD 5'-0" 6'-0" NGVD STREET ELEV. 5'-10" NGVD STREET ELEV. NGVD 5'-6" NGVD 5'-0" ELEVATED WALKWAY ABOVE PLANTER R .O .W . L I N E R.O.W. LINE 2 4 7 ' - 1 1 1 /2 " R.O.W. LINE PROPERTY LINE 9 ' - 1 0 1 / 2 " 2 4 ' - 0 " 2 4 ' - 1 " 8 5 ' - 8 " N No copies, transmissions, reproductions, or electronic manipulation of any portion of these drawings in whole or in part are to be made without the express written permission of Arquitectonica International. All designs indicated in these drawings are property of Arquitectonica International. All copyrights reserved (c) 2019. The data included in this study is conceptual in nature and will con tinue to be modified throughout the course of the projects development with the eventual integration of structural, MEP and life safety systems. As these are further refined, the numbers will be adjusted accordingly. 2900 Oak Avenue, Miami, FL 33133 T 305.372.1812 F 305.372.1175 FIRST DRB SUBMITTAL 5TH STREET BAYWALK CONNECTOR BRIDGE MIAMI BEACH, FL 33139 0 84 16 32 64 ftScale: 1/16" = 1'-0" BRIDGE - OPTION 1 RAMP LEVEL 1 PLAN A5-09DATE: 03/18/2019 PHASING NOTE: 1. TEMPORARY METAL STAIRWELL WITH POWDER COATED MARINE GRADE PAINT FINISH TO BE PROVIDED UNTIL 500 ALTON PROJECT IS COMPLETED AND BRIDGE IS CONNECTED TO ELEVATED WALKWAY SYSTEM AT 500 ALTON. GENERAL NOTE: ALL CONCRETE COLUMNS AND OTHER SURFACES 10' AND BELOW WILL RECEIVE GRAFFITI GUARD PAINT FINISH Prior Design Concepts Option 1 See disclaimers page. N No copies, transmissions, reproductions, or electronic manipulation of any portion of these drawings in whole or in part are to be made without the express written permission of Arquitectonica International. All designs indicated in these drawings are property of Arquitectonica International. All copyrights reserved (c) 2019. The data included in this study is conceptual in nature and will continue to be modified throughout the course of the projects development with the eventual integration of structural, MEP and life safety systems. As these are further refined, the numbers will be adjusted accordingly. 2900 Oak Avenue, Miami, FL 33133 T 305.372.1812 F 305.372.1175 FIRST DRB SUBMITTAL 5TH STREET BAYWALK CONNECTOR BRIDGE MIAMI BEACH, FL 33139 0428 16 32 ftScale: BRIDGE - OPTION 1 RAMP RENDERED ELEVATIONS A5-13DATE: 03/18/2019 Prior Design Concepts Option 1 See disclaimers page. Prior Design Concepts No copies, transmissions, reproductions, or electronic manipulation of any portion of these drawings in whole or in part are to be made without the express written permission of Arquitectonica International. All designs indicated in these drawings are property of Arquitectonica International. All copyrights reserved (c) 2019. The data included in this study is conceptual in nature and will continue to be modified throughout the course of the projects development with the eventual integration of structural, MEP and life safety systems. As these are further refined, the numbers will be adjusted accordingly. 2900 Oak Avenue, Miami, FL 33133 T 305.372.1812 F 305.372.1175 FIRST DRB SUBMITTAL 5TH STREET BAYWALK CONNECTOR BRIDGE MIAMI BEACH, FL 33139 OPTION 2 RENDERING A5-14DATE: 03/18/2019 Option 2 See disclaimers page. UP 1 A5-23 A5-18 1 A5-19 2 A5-191 (E) BUILDING LINE OF WALKWAY ABOVE ELEV. CONCRETE COLUMN CONCRETE PIER CAP BEAM ABOVE CONCRETE COLUMNS, TYP. 1 1 6 3 ' - 1 1 " R .O .W . L I N E 5 T H S T R E E T ( M A C A R T H U R C A U S E W A Y ) E A S T B O U N D F L Y O V E R R A M P 16'-0" WIDE FIRE TRUCK ACCESS LANE NGVD 5'-0" W E S T A V E N U E 6'-0" NGVD STREET ELEV. 5'-10" NGVD STREET ELEV. ELEVATED WALKWAY ABOVE PLANTER CONCRETE COLUMN CONCRETE PIER CAP BEAM ABOVE EA S T B O U N D WE S T B O U N D GLASS VESTIBULE R.O.W. LINE 3 5 ' - 8 1 / 2 " PROPERTY LINE 9 ' - 1 0 1 / 2 " 2 4 ' - 0 " 2 4 ' - 1 " 8 5 ' - 8 " ALUMINUM FINS WITH POWDER COATED MARINE GRADE PAINT SYSTEM BEYOND, MEET AMA 2605 STANDARD AT STAIR AND ELEVATOR ENCLOSURE ELEVATOR TO HAVE GLASS AT 3 SIDES N No copies, transmissions, reproductions, or electronic manipulation of any portion of these drawings in whole or in part are to be made without the express written permission of Arquitectonica International. All designs indicated in these drawings are property of Arquitectonica International. All copyrights reserved (c) 2019. The data included in this study is conceptual in nature and will continue to be modified throughout the course of the projects development with the eventual integration of structural, MEP and life safety systems. As these are further refined, the numbers will be adjusted accordingly. 2900 Oak Avenue, Miami, FL 33133 T 305.372.1812 F 305.372.1175 FIRST DRB SUBMITTAL 5TH STREET BAYWALK CONNECTOR BRIDGE MIAMI BEACH, FL 33139 0428 16 32 ftScale: 1/8" = 1'-0" BRIDGE - OPTION 2 STAIR LEVEL 1 PLAN A5-15DATE: 03/18/2019 PHASING NOTE: 1. TEMPORARY METAL STAIRWELL WITH POWDER COATED MARINE GRADE PAINT FINISH TO BE PROVIDED UNTIL 500 ALTON PROJECT IS COMPLETED AND BRIDGE IS CONNECTED TO ELEVATED WALKWAY SYSTEM AT 500 ALTON. GENERAL NOTE: ALL CONCRETE COLUMNS AND OTHER SURFACES 10' AND BELOW WILL RECEIVE GRAFFITI GUARD PAINT FINISH Prior Design Concepts Option 2 Easement →Bridge and bridge platforms are located outside of Icon and Bentley Bay Right-of-Way areas →Away from the 15’ wide Fire Department Baywalk access →Working around the storm line structures at the main Column/Pier supports at each side of 5th street →Location of the bridge accounts for the County’s future rail system See disclaimers page. City of Miami Beach Coordination Miami Dade County Coordination Design Considerations Artist’s conceptual rendering. See disclaimers page. →Placing bridge and platforms within the FDOT setbacks →Complying with the minimum FDOT curved section fin height of 10’-0”, which continue 4’ past roadway edge →Requested FDOT Easement →FDOT Permit Set due date is May 27, 2019. →The width of the bridge (minimum 12’-0”) accommodates both bicycles and pedestrians →The bridge will provide a minimum vertical clearance of 17’-6” →2”x2” minimum mesh opening between the fins at the bridge area →1’ high upturned beams at the edge of walkways →Typical 48” high guardrails FDOT Coordination Other Design Considerations Design Considerations See disclaimers page. FDOT Standards Ground Level See disclaimers page. 2nd Level See disclaimers page. Baywalk Connector Path Locate underground utilities prior to foundation work. Construct new bridge foundations (48” diameter drilled caisons) 48” ø Drilled Caissons Construction Sequencing See disclaimers page. 1. Foundations Construction Sequencing Construct pier columns and caps See disclaimers page. 2. Substructure Construction Sequencing West Elevation Construct pier columns and caps See disclaimers page. 2A. Substructure Construction Sequencing Construct stairs and 1st level of elevator tower West Elevation See disclaimers page. 2B. Stairs and Elevator Tower (Level 1) Construction Sequencing LU z _J ■Setup detour of MacAr thur Causeway/5th Street (Road cl osure) for erection of beams ■Erect and secure main span bridge beams ■Reopen road to traffic and construct bridge deck ■Construct 2nd level of elevator tower 500 AL TON BEYOND CONCRETE PIER CAP BEAM STAIR #2 BEYOND -----­ CONCRETE COLUMN CONCRETE COLUMNS BEYOND -------,, ARQU/TECTONICA 2900 Oak Avenue, Miami, FL 33133 T 305.372.1812 F 305.372.1175 LAKES ENGINEERING, INC. MACAR THUR CAUSEWAY 35' -0" THREE (3) LANES No copies, transmissions, reproductions, or electronic manipulation of any portion of these drawings in whole or in part are to be made without the express written permission of Arquitectonica International. All designs indicated in these drawings are property of Arquitectonica International. All copyrights reserved (c) 2019. The data included in this study is conceptual in nature and will continue to be modified throughout the course of the projects development with the eventual integration of structural, MEP and life safety systems. As these are further refined, the numbers will be adjusted accordingly. EAST BOUND FLY OVER RAMP 17'-3 5/8" ONE (1) LANE 24' -6" TWO (2) LANES FINAL ORB SUBMITTAL 5TH STREET BA YWALK PEDESTRIAN CONNECTOR BRIDGE MIAMI BEACH, FL 33139 5' -2" IDEWAL PHASE 3 BEAM AND ELEVATOR TOWER (LEVEL 2) LU z _J s: 0 a::: t­o 0 LL I • I • I • I • I • I • I I • O'> ' NOA GLASS ENCLOSURE AT ELEVATOR VESTIB ULE BEYOND co ' B R IDGE LEVEL 2 NOA GLASS ENCLOSURE AT ELEVATOR VESTIBULE CONCRETE PIER CAP BEAM CONCRETE COLUMN AND OTHER SURFACES 10' AND BELOW WILL RECEIVE GRAFFITI GUARD PAINT FINISH b ' in N BRIDGE LEVEL 1 "--------STAIR #1 5' -0" DATE: 04/08/2019 A5-54 West Elevation See disclaimers page. 3. Beam and Elevator Tower (Level 2) Construction Sequencing Install bridge railings and decorative fins Install metal panels at underdeck bridge fascia West Elevation See disclaimers page. 4. Decorative Fins Construction Sequencing Install decorative signs Complete mechanical and electrical work West Elevation See disclaimers page. 5. Finishing Thank you! Artist’s conceptual rendering This project is being developed by TCH 500 Alton, LLC, a Florida limited liability company (“Developer”), which has a limited right to use the trademarked names and logos of Terra and Crescent Heights. Any and all statements, disclosures and/or representations shall be deemed made by Developer and not by Terra and/or Crescent Heights, and you agree to look solely to Developer (and not to Terra and/or Crescent Heights and/or any of either of their affiliates) with respect to any and all matters relating to the sales and marketing and/or development of the Project. These materials are not intended to be an offer to sell, or solicitation to buy a unit in the condominium. Such an offering shall only be made pursuant to the prospectus (offering circular) for the condominium and no statements should be relied upon unless made in the prospectus or in the applicable purchase agreement. In no event shall any solicitation, offer or sale of a unit in the condominium be made in, or to residents of, any state or country in which such activity would be unlawful. Stated square footages and dimensions are measured to the exterior boundaries of the exterior walls and the centerline of interior demising walls and in fact vary from the square footage and dimensions that would be determined by using the description and definition of the “Unit” set forth in the Declaration (which generally only includes the interior airspace between the perimeter walls and excludes all interior structural components and other common elements). This method is generally used in sales materials and is provided to allow a prospective buyer to compare the Units with units in other condominium projects that utilize the same method. Measurements of rooms set forth on this floor plan are generally taken at the farthest points of each given room (as if the room were a perfect rectangle), without regard for any cutouts or variations. Accordingly, the area of the actual room will typically be smaller than the product obtained by multiplying the stated length and width. All dimensions are estimates which will vary with actual construction, and all floor plans, specifications and other development plans are subject to change and will not necessarily accurately reflect the final plans and specifications for the development. All images and designs depicted herein are artist’s conceptual renderings, which are based upon preliminary development plans, and are subject to change without notice in the manner provided in the offering documents. All such materials are not to scale and are shown solely for illustrative purposes. All plans, features and amenities depicted herein are based upon preliminary development plans, and are subject to change without notice in the manner provided in the offering documents. No guarantees or representations whatsoever are made that existing or future views of the project and surrounding areas depicted by artist’s conceptual renderings or otherwise described herein, will be provided or, if provided, will be as depicted or described herein. The sketches, renderings, graphics materials, plans, specifications, terms, conditions and statements contained in this brochure are proposed only, and the Developer reserves the right to modify, revise or withdraw any or all of the same in its sole discretion and without prior notice. All improvements, designs and construction are subject to first obtaining the appropriate federal, state and local permits and approvals for same. Developer expressly reserved the right to make modifications, revisions and changes it deeded desirable in its sole and absolute discretion. The information provided herein regarding the City of Miami Beach and its surrounding areas and/or other proposed nearby projects or facilities was obtained from newspaper articles and other publicly available information and Developer makes no representations as to same. Certain information set forth herein includes forecasts, budgets, projections, timelines, schedules and other predictive and forward-looking statements (collectively, the “Projections”) that represent assumptions and expectations of the Developer in light of currently available information. No representation or warranty, express or implied, is provided in relation to the fairness, accuracy, correctness, completeness or reliability of the Projections. Neither this brochure nor any of the Projections shall form the basis of any contract or commitment with the Developer. Although Projections contained in this brochure are based upon what management of the Developer believes are reasonable assumptions, there can be no assurance that the Projections will prove to be accurate, as actual results and future events could differ materially from those anticipated. The Projections are preliminary and subject to change; the Developer undertakes no obligation to update the Projections if circumstances or management’s estimates or opinions should change except as required by applicable laws. Actual performance and results may differ from those projected in the Projections and no guarantee is presented or implied as to the accuracy of the Projections contained herein. The project graphics, renderings and text provided herein are copyrighted works owned by the Developer. All rights reserved. Unauthorized reproduction, display or other dissemination of such materials is strictly prohibited and constitutes copyright infringement. No real estate broker is authorized to make any representations or other statements regarding the projects, and no agreements with, deposits paid to or other arrangements made with any real estate broker are or shall be binding on the Developer.