Loading...
Amendment No. 43 to the Agreement with Fentress Architects in the amount of $45,180 do/Y- 2 8 S AMENDMENT NO.43 TO THE AGREEMENT BETWEEN THE CITY OF MIAMI BEACH,FLORIDA AND FENTRESS ARCHITECTS, DATED MAY 14,2014, FOR DESIGN CRITERIA PROFESSIONAL SERVICES FOR THE MIAMI BEACH CONVENTION CENTER RENOVATION PROJECT, IN THE AMOUNT OF$45,180 This Amendment No. 43 to the Agreement made and entered this Lday of M A-7 , 2019, by and between the CITY OF MIAMI BEACH, a municipal corporation existing under the laws of the State of Florida (hereinafter referred to as City), having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 33139, and FENTRESS ARCHITECTS, a Colorado corporation, having its offices at 421 Broadway, Denver, Colorado (hereinafter referred to as"Consultant"or"Architect-Engineer"). RECITALS WHEREAS, pursuant to Request for Qualifications (RFQ)No. 2014-142ME, the Mayor and City Commission adopted Resolution No. 2014-28538 on April 9, 2014,approving and authorizing the Mayor and City Clerk to execute an Agreement with Fentress Architects for Design Criteria Professional Services for the Miami Beach Convention Center Renovation Project(the"Agreement");and WHEREAS, the Agreement was executed for a lump sum amount of$10,967,200 including reimbursable expenses; and WHEREAS, on December 8, 2014, Amendment No. 1 was executed for correction to Task 3 - Design Development and Design Criteria Package Services, requiring 30% completion level for low voltage systems in lieu of 90%completion; and WHEREAS, on December 8, 2014, Amendment No. 2 was executed for supplemental civil engineering services in the amount of$41,079; and WHEREAS, on December 8, 2014, Amendment No. 3 was executed for additional services to revise the quantity, sizes and configurations of the main ballroom, junior ballrooms, and meeting rooms, in the amount of $179,982; and WHEREAS, on January 21, 2015, Amendment No. 4 was executed for a regional stormwater pump station location analysis, and for the development of a 3D animation and custom website for the Project in the amount of $76,605; and WHEREAS,on February 11, 2015,the City Commission authorized Resolution No.2015-28925, authorizing an additional lump sum amount of $14,469,500, for the purpose of retaining Fentress to complete all design and construction administration services for the Project; and WHEREAS, on March 31, 2015,Amendment No. 5 was executed for the completion of design development documents and preparation of Bid Package 1, in the amount of$2,442,400(part of Resolution No.2015-28925); and WHEREAS,on May 28,2015,Amendment No.6 was executed for a deductive adjustment to the Agreement in the total amount of$3,129,259, to delete the remaining Tasks 4, 5 and 6 of the Scope of Services set forth in Schedule A of the Agreement, as such tasks are no longer applicable and shall be superseded by a subsequent amendment with regard to the construction documentation and administration services required for the Project(part of Resolution No.2015-28925);and WHEREAS, on May 28, 2015, Amendment No. 7 was executed for Additional Services relating to wind loading and micro-climate services, in the amount of$117,200; WHEREAS, on May 28, 2015, Amendment No. 8 was executed to retain Fentress Architects to serve as Architect of Record for the Project, to clarify requirements with regard to Design Development, and to provide for completion of Construction Documents and all construction administration services required of the Architect-Engineer for the Project, in the total amount of$15,156,359(part of Resolution No. 2015-28925);and 1 WHEREAS, on August 14, 2015, Amendment No. 9 was executed for the provision of Commissioning Services, in the total amount of$302,876; and WHEREAS, on October 27, 2015, Amendment No. 10 was executed for a parapet design analysis and consultation services to reduce the applicable wind pressures on the curtain wall for potential construction cost reductions, in the amount of$15,000; and WHEREAS, on December 4, 2015, Amendment No. 11 was executed for the preparation of event plans background drawings to be used by event planners during construction, in the amount of$36,875; and WHEREAS, on March 29, 2016, Amendment No. 12 was executed for stormwater design revisions related to Public Works Department's pump stations design, in the amount of$34,073; and WHEREAS, on May 31, 2016, Amendment No. 13 was executed for design changes associated with the removal of the smoke control system, in the amount of$173,790; and WHEREAS, on June 10, 2016,Amendment No. 14 was executed for additional site visits by members of the design team for a weekly presence through July 28,2016,and for the implementation of alternative designs requested by the Construction Manager, in the amount of$148,999; and WHEREAS, on July 18, 2016, Amendment No. 15 was executed for design changes associated with raising 18th Street, 19th Street and Convention Center Drive, requested by Public Works to allow the raising of Meridian Avenue and 17th Street in the future, in the amount of$111,338; and WHEREAS, on August 26, 2016 Amendment No. 16 was executed for the addition of a 72"storm culvert to serve as a temporary bypass until the new culvert on 17th Street is completed by Public Works; and for the redesign of Convention Center Drive between 17th and 18th Streets due to the postponement of the Convention Center Hotel Project, in the amount of$70,270;and WHEREAS, on September 7, 2016, Amendment No. 17 was executed for GMP cost reconciliation services beyond what was originally contemplated in the basic construction administration services, in the amount of$49,360; and WHEREAS, on September 7, 2016, Amendment No. 18 was executed for additional site visits by members of the design team for a weekly presence through approximately September 30, 2016, and for the implementation of alternative designs requested by the Construction Manager, in the amount of$112,649; and WHEREAS, on October 24, 2016, Amendment No. 19 was executed for design changes associated with retaining the east half of the existing exhibit hall bridge to provide more flexibility in egress travel distances of show layouts, in the amount of 220,291; and WHEREAS, on November 16, 2016, Amendment No. 20 was executed for additional reviews of steel submittals and for revisions of levels two and five truss loading for temporary conditions for Art Basel 2016; this Amendment is to be funded from a deductive change order to the Agreement with Clark Construction, in the amount of$96,710; and WHEREAS, on December 20, 2016, Amendment No. 21 was executed for additional design services associated with the incorporation of additional security cameras, revisions to vaults requested by FPL, additional structural engineering resulting from unforeseen site conditions (RFIs), construction details for the temporary transition slab required for Art Basel 2016, and renovation of the east kitchen not included in the original scope of work, in the amount of$80,330; and WHEREAS, on December 20, 2016, Amendment No. 22 was executed for revisions to the construction documents as needed for artwork installations by Sarah Moris, Franz Ackermann and Ellen Harvey, selected as part of the Art in Public Places Program, in the amount of$17,121; and WHEREAS, on December 20, 2016, Amendment No. 23 was executed for additional structural engineering services due to non-conformances by Clark Construction, in the amount of$10,000; and WHEREAS, on January 18, 2017, Amendment No. 24 was executed for additional design, permitting and construction administration services related to a new sanitary sewer lateral for the Carl Fisher Clubhouse, in the amount of$18,625; and 2 WHEREAS, on May 5, 2017, Amendment No.25 was executed for revisions to the signage package, in the amount of$12,030; and WHEREAS, on May 5,2017,Amendment No.26 was executed for additional reviews of structural submittals and for design revisions associated with non-conforming field conditions, funded from a deductive change order to the Agreement with Clark Construction, in the amount of$15,580; and WHEREAS, on May 5, 2017, Amendment No. 27 was executed for design services to incorporate a new vertical circulation connection between the north side of the Exhibit Hall D and the Grand Ballroom on Level 2, in the amount of 124,240, as approved by the City Commission on April 26, 2017(Agenda Item R7T);and WHEREAS, on June 30, 2017, Amendment No. 28 was executed for design revisions associated with the relocation of the 19th Street pump station, in the amount of$2,585; and WHEREAS, on August 15, 2017, Amendment No. 29 was executed for design solutions for contractor- requested items related to closing non-conforming conditions related to RFI 3251, and for additional reviews of structural submittals,funded from a deductive change order to the Agreement with Clark Construction, in the amount of$30,875 ; and WHEREAS, on August 18, 2017, Amendment No. 30 was executed for additional services associated with revisions to the P-Lot Park design, as approved by the City Commission on July 26, 2017, in the amount of 349,076; and WHEREAS, on September 18, 2017, Amendment No. 31 was executed for revisions to the construction documents as needed for artwork installations by Joseph Kosuth,selected as part of the Art in Public Places Program, in the amount of$14,570; and WHEREAS,,on September 18, 2017, Amendment No. 32 was executed for revisions to the construction documents approved in Amendment No. 27, to accommodate the construction that progressed during the delayed issuance of the package due to extended negotiations with Art Basel, in the amount of$11,430;and WHEREAS, on September 19, 2017, Amendment No. 33 was executed for drainage revisions associated with keeping the existing culvert that crosses the P-Lot in lieu of removal, as requested by Public Works, due to the postponement of the 17th Street drainage improvements, in the amount of$11,985,and for revisions to the southwest corner rendering in the amount of$1,350; and WHEREAS, on December 15, 2015, Amendment No. 34 was executed for additional reviews of structural submittals, and for design solutions for contractor-requested items related to closing non-conforming conditions, in the amount of$50,785, to be funded from a deductive change order to the Agreement with Clark Construction; and WHEREAS,on December 15,2017,Amendment No. 35 was executed for design revisions to the 21st Street Park as a result of the pump station installation and changes required for AIPP installations in the amount of$43,788, and for design solutions for the repair to the existing culvert which collapsed during installation of the new culvert, in the amount of$4,840; and WHEREAS, August 6, 2018,Amendment No. 36 was executed for 19th Street revisions as a result of pump station relocation, and additional construction administration services through November 30, 2018, in the amount of $136,408; and WHEREAS, on September 21, 2018, Amendment No. 37 was executed for design revisions to 21st Street Park associated with retaining existing mahoganies and de-scoping sitework around Carl Fisher Clubhouse and Pump Station; reconciliation of relocated trees and associated design revisions to 21st Park;and 19th Street revisions as a result of the Holocaust Memorial's request to keep the existing stone cladded knee wall; in the amount of $50,320; and WHEREAS,on September 25,2018,Amendment No.38 was executed for the development of a stand-alone package for the P-Lot Park for a separate permit, structural footing design for events tent structures, and additional services for re-bidding and construction administration of the park, in the amount of$261,445; and WHEREAS, on January 9, 2019 Amendment No. 39 was executed for the analysis, design and documentation to reinforce the existing structure to withstand additional cooling tower loads (NCR 3363 and RFI 3 3691), an updated site plan rendering, and extended:construction administration services for the:building, in the ;: . amount of$206,510;and WHEREAS,on February 28,2019,Amendment No.40 was executed for additional design services required to redesign the routing of the.Florida Power and Light(FP&L)ductbank for P-Lot Park, in the amount of$5,328; and WHEREAS, on February 28; 2019, Amendment No. 41 was:executed for additional design services related: to revised pavement striping at 18'' Street as requested:by Transportation Department, and electrical revisions at 21st Street Park,.in the amount of$7;125; and 1 WHEREAS, on March 29, 2019, Amendment No. 42 for extended Construction Administration Services. through.August 31,2019,'in the amount of$263,250; and 'WHEREAS, this Amendment No. 43 is for the incorporation of Requests for Information (RFI's) into the contract documents, required for permit revision. NOW, THEREFORE., the parties hereto; and :in consideration..of the mutual promises,; covenants, agreements; terms, and conditions hereincontained, and Other good and valuable consideration, the respect.and. adequacy are hereby acknowledged, do agree as follows: 1. ABOVE RECITALS. The above recitals'are true and correct and are incorporated:as a part of this Amendment No.43. 2. MODIFICATIONS. The Agreement is amended as provided in Appendix`A-43";attached herein. 3. OTHER PROVISIONS. All other provisions:of the Agreement;as amended, are unchanged and in full force and effect. •4. RATIFICATION. The City and Consultant ratify the terms of the Agreement, as amended by this Amendment No.43. IN WITNESS WHEREOF, theparties hereto have caus-d this Amen.ment No.43 to be executed in their e names by their,duly authorized officials as of the date first set fi rth above. ATTES • . CITY';o F MIAMI =EACH 4 r 22 <_< • Rafae Grana•o Jim L. Mor.1-s : City Clerk City anagen" :.: : ATTE .T: : .: :.: : :: CON'' LTANT:. FE SS_ARCHITEC S Signature: Signature 1.101r _a it Ck)61- Print Name%Title ( Print:Name/Title I . APPROVED ASTO FORM& LANGUAGE .,�...�„„ &FG EX CLITION D 11 tlIKOt! OWAWEDI I • city.Atorne Date 1 Appendix"A-43 1. SCOPE OF SERVICES Refer to attached proposal dated March 22, 2019 2. PAYMENT AND COMPENSATION $45,180 Lump Sum 5 ` Project Contingency Added Total Scope Original Agreement $ 10,967,200 $ 1,096,720 $12,063,920 Amendment-Reso 2015-28925 (5,6&8) Amendment 5 $ 2,442,400 $ 2,442,400 Amendment 6 $ (3,129,259) $ (3,129,259) Amendment 8 $ 15,156,3591 $15,156,359 Contingency reduction $ (96,720) $ (96,720) Total $25,436,700 $1,000,000 $26,436,700 Amendment 2-Civil $ 41,079 Amendment 3-Ballrm change $ 179,982 Amendment 4-Stormwater/website $ 76,605 Amendment 7-Wind study/roof survey $ 117,200 Amendment 9-Commissioning $ 302,876 Amendment 10-Parapet Analysis $ 15,000 Amendment 11-Event Plans $ 36,875 Amendment 12-Stormwater Revisions $ 34,073 Amendment 13-Smoke Control Removal $ 173,790 Amendment 14-Site Visits&Alternative Design $ - $ 148,999 Amendment 15-Streets Regrading $ 22,520 $ 88,818 Amendment 16-Culvert and Cony Ctr Dr redesign $ 70,270 Amendment 17-GMP Reconciliation-add'I $ 49,360 Amendment 18-Additional Site Visits $ 112,649 Amendment 19-East Bridge Retention $ 220,291 Amendment 20-Steel submittals and Truss loading analysis $ 96,710 Amendment 21 Cameras,vaults,RFIs,kitchen,transition slab $ 80,330 Amendment 22-AIPP(Morris,Ackermann&Harvey) $ 17,121 Amendment 23-NCRs* $ 10,000 Amendment 24-Sanitary Sewer Lateral -Carl Fisher Clubhouse $ 18,625 Amendment 25-Signage Package Revisions $ 12,030 Amendment 26-Structural submittals&NCRs $ 15,580 Amendment 27-Exhibit hall/Ballroom Vertical Circulation $ 124,240 Amendment 28-19th Street Pump Station Relocation $ 2,585 Amendment 29-RFI 3251&Structural Submittals $ 30,875 Amendment 30-P-Lot Park Revision $ 349,076 Amendment 31-AIPP(Joseph Kosuth) $ 14,570 Amendment 32-Exhibit Hall/Ballroom Vertical Circulation rev $ 11,430 Amendment 33-Plot culvert and rendering $ 13,335 Amendment 34-Structural Submittals&/NCRs $ 50,785 Amendment 35-21st St Park Rev&Culvert repair $ 48,628 Amendment 36-19th St and CA Services $ 136,408 Amendment 37-21st Park,Tree Reconc,19th St $ 50,320 Amendment 38-Plot Park Repackaging and CA services $ 261,445 Amendment 39-Rendering,NCR 3363,Add'I CA Services Bldg $ 206,510 Amendment 40-Plot Park-FPL Ductbank $ 5,328 Amendment 41-18th St pavement marking and 21st elec $ 7,125 Amendment 42-Extended CA and RFIs review $ 263,250 Amendment 43-Incorporation of RFIs into Contract Documents $ 45,180 Total $25,436,700 $1,000,000 $2,561,873 $28,998,573 1. Amendments 14,18,20,23,26,29 and 34 totaling$465,598,funded from Clark's contract via deductive change orders. 2. Amendments 22&31 totaling$31,691 funded from AIPP fund. 6 1 : FENTRESS ARGHI7ECT5 is .. .. .. _ .. .. .. . . . .. . . . . fentre$sarchitects.corn is March 22,2019 Mn jimmy Morales, g CityManager City Manager'sOffice City of;Miami,Beach 1700 Convention Center Drive I 4th Floor : . Miami Beach;FL 33139 ( Re: : Miami Beach Convention Center Renovation.Resolution No:2014-28538 Proposal 73 7 Interim Record Drawings :: :: Project 20140021.001 A68 Dear Mr.Morales: a This proposal is for provide additional design services to provide interim record drawings as requested by the City of Mianii Beach.This service is currently outside of the Fentress team's current scope of work This proposal provides one update of the design documents as outlined below to provide interim record drawings with the incorporation of the Construction Manager's-requests for information,as listed in the attached:spreadsheet. Below is.our understanding } of the scope of services required: SCOPE'OF SERVICES 1. General: : . . . a. This is a one-time-effort performed as soon as possible. b. The deliverable will be provided in PDF Electronic Format with two(2)hard copies,signed and sealed. c. Theeffort will incorporate approximate 160.RFI's into the Contract Documents through a revision to the Permit Set of drawings. 2. Updating of design documents based on these RF1's include the following disciplines: a. Architecture; b:. Interiors; C. Structural; d. Mechanical; e. Electrical; f Plumbing.: g. Selected Landscape; h. Selected Audio:Visual,Information Technology,and Security::. 3. Specifications are excluded as the Building Department does not accept or review this component of the design documentation. I. SCHEDULE • Review of information received.from Contractor: 1 week Incorporate information into drawings: 2 weeks TOTAL .3:weeks Delivery expected on April 1,2019 D!E.14 . D;C:, : L'A SF LON SH j 421 Broadway : I Denver C.0. 80203 30.3•722•..5000 .. ..,. . Mr.Jimmy Morales,City Manager : City Manager's Office City of Miami Beach.. Proposal 73—Interim:Record Drawings March:22,201:9' Page 2:: : .. ... ( FEE Fees for the services above will be a total proposed lump sum amount of•Forty-Five Thousand One Hundred and Eighty Dollars($45,180):Costsfor printing and delivery are included in the lump sum portion of this fee. Billings for these services will be invoiced under the heading#20140021.001, A68. Attached:is:the breakdown of hours and associated fee for this additional effort. Your assistance in facilitating the request of this additional effort as:a modification to our contract is appreciated. Please:feel free to contact me with any further questions or comments you may have, If the foregoing correctly states your understanding,please prepare:a contract amendment for our execution.We are very happy to be of:service to the City and continue our successful:relationship. Sincerely, . ... . . Fentress Architects Jo Kudrycki,AIA, EED .�BD+C � _Principal encl: Design Fee Summary dated March 21,2019 c: Maria Hernandez,Thais Vieira,City of Miaini Beach Steven:-DiBartolo,Hill International,Inc. Anne McNeely;Fentress Architects Jenni Gee,Fentress Architects { • Project: Record Drawings Miami Beach.:Convention Center Renovation &:Expansion 3121119' Study, &_Design Firm Discipline Firm Name Fee Number Base S;erv�ces., ! .. Architecture Fentress Architects. 1 $12,900 Architecture Arquitectonica 4 $0 Fire/Life Safety/Code Consulting Jensen Hughes 13 ; ; $8;045 Civil/Utility Engineering Kimle -Horn y 6 • $0 Landscape :: West 8 7 $2,795 l .. Structural Engineering .. Wallace 8 ,$4;850 Vertical Transportation:: Lerch Bates 12 • , .``$0 Plumb,.Mech,Elec, Lighting:. ME Engineers 14-18 $15,505 IT/AV/Communcations&Securitl DL Adams 20 , - •' ' • $885 Food Service Caruso 25. ;$0 Traffic Corradino 27 $0 Graphics.and Signage TKD 28 $0 Parking Consultation Walker Parking 29 -$0 ( Design Fees(Lump Sum) $44,98.0 Expenses: ::':.. $200 Both Base and Optoinal Services Total . :: $45,1$0, •( • } ( ( Record Drawings t Fentress Architects 1I ours :,,.. . .- ., _ . , .� i Job Title :: .. . , Hourly Rate Hours •Extension I Task 1Vlanggemegt,Arehifectural Design,Coordination and Oversight _.• 1 Project Architect :$150.00 0 . .. $0.00 Architect III : I.$200.00 60 $1.2,000:00 Architect II $130:00 0 $0.00 Intern.Architect II $100.00 0 $0.00 1 Interior Designer II $1.10.00 0. $0.00 : John Kudrycki : : $225:00 4 $900:00 Totals this activity: :Hours I 64.0 :. $12,900.00 Total,Sub 1 64.0 $12,90.0.00 f ; Hours Total : ::.. . 64.0 $12,90.0.00 t 1 I 1 'II a 1 i 1' 1 I. fi. 1. f Miami Beach Convention Center j • Fentress Project No:20140021: March 21,2016: Page 2 of:8 t • ''Record Drawings West 8 • f iiii �. ":: l ' tip.' 1:1 Job Title Hourly Rate Hours Extension f Landscape°Design(optional I Design Director ; $375.00 0.0 $0.00 Principal/Director • $250:0.0 : 0.0 :$0.0G i : Project Director $185.00 0.0 $0.00 :' Project Manager, :: : $165.00 3.0: :.: $49500 :. Landscape Designer $115.00 20.0 $2,300.00: Staff Designer : ::.: : : .. ::.: : $85,00 0.0 $0.00 Administrative. $65.00 0,.0 . $0.00 Totals this activity: ' :: . Hours 23.0: : $2,795.00 : { 1 Total,Sub 1 23.0 $2,795.00 Hours Total . . 23.0 $2,795.00 I i • I i 1. l i G: • i I •I j I j I f . } Page 4 of 8 t 4 e { d Record Drawings Wallace Engineering. :.. 1 Hours . �, . �. ,._. . . . ,. .•, .. ,•_ ,z. ,._ .&•&-,,, ,..__ , .:' • Job Title • Hourly Rate Hours Extension • Strucfui al Engineer iii „.g Principal $170.00 1.0 $170:00 Associate $150.00 2.0 $300.00 I Registered.Engineer II $:135.00 0.0 $0.00 Registered Engineer I $120.00 5.0 $600.00 CAD.Tecluucian III y $105.00 . .':..36.0 $3;780:00 ::.. I : Totals this activity: Hours 44.0 $4,80.00 • ITotal,Sub 1 44.0 :$4,850.00 I Hours Total 44.0 54,850.00 I I I I ' ••I I i I { ,: t i t 1 t • i t i .:Page 5 of 8 f .. .. .. .. . . .. .: . . .. . Record Drawings : M E Engineers Iotars 3 t, , R ' Job:Title Hourly Rate Hours Extension Task 1 HVAC•Engincertng Principal $200.00 . .' 4.0 $800.00 Project Engineer. $120.00" 0:0 $0.00 } Associate . : :. $160.00 8.0 . $1,280.00 } CAD Operator .. " . • $95'.00 30.0 $2,850.00 1 Totals this activity:. : : 42.0 $4,930.00 :.. i . . .. Hours Task 2 Eleetricgogineepng :. A .. 1 . Principal $200.00 4.0 $800.00 :i Associate $:160.00 40.0 $6,400.00 i CAD Operator $95:00 . 9.0 $855.00 Totals this activity: Hours . . . 53.0 $8,055.00 i Task3 FP,lumbjng!Eng neertng' 1" Principal $200.00 ' 0.0 •• $Q:00 :. i Project Engineer $120..00 ' 21.0 $2,520:00 iTotals this.activity: .. .. Hours : .. 21.0. : . $2,520.00 1 . . Total,Sub 1 42.0 $4,930.00 - 1 :I Total,$ub 2 53.0 $8,055:00 } 1 4 Total,Sub 3 21.0 : :$2,520.00 1 i Hours Total 116.0 $15;505.001. . i f 1 I. :{ Page 6 of 8 . t Record Drawings ::. .: Jensen Hughes : .. 1 Job Title HourlyRat Hours Extension' t Task 1,mi iodel►ng,Effort,,Meetings and @ooxdmatip' Fare Protection Engineering I Vice President;•; $250.00: 0.0 $0.00 1 Operations manager/Director $230.00 0.0 $0:00 , Senior Consultant/Associate Manager $205:•00 5.0 :$:1,025.00 1 Consultant $175.00. ' 0.0 .$0:00 1 Associate II: : :.. $150.00: 45.0 $6,750.00 . 3 i Associate I : $135.00 2.0 $270:00 Project Administrator • ; : • • 1$7.5•..0.0 0.0 • .$0:00 Totals this activity: • ;. . _ Hours : 52.0 $8,045.00 • Total;Sub 1 52.0 $8,045:00 Hours Total 52.0 $8,045.00 t t f I t i t • I i. 4 1.1 , C Record'Drawirigs :.. DL Adams & Associates . ' .Sob Title Hourly Rate Hours Extension j . :how Voltage Desi n Securi ermitted,drawin s 1 . . ,d g �,,..w tY�R g ) Principal $2'10.00: 1.0 $21.0:00 Associate Principal $190.00 0.0 . $0:00 Project Manager : :.$155.00 i 0.0 .. $0.00 : i Seniordonsultant $135.00. 5.0 $675.00 :: Staff Consultant : :: :. $90,00: :. 0.0 $0:00 ' Totals this activity': . Hours.' 6:0 . $885.00 C Total Total 6.0 $885.00 f f } ? itt I It l I I I I i j , . 1 Page 8,of 8 RFI Response Follow-Up Miami Beach Convention Center 3/22/2019 RFI# Description Fentress Architects Response Responsibility Date Completed. - 1718 Additional loading dock ramp information Provided additional elevations and dimensions,A2108 Fentress Architects 1761 Gas line re-rout Provided new size and route,P2216,P2311,P2316,P7002 M-E Engineers 1779.1 Overflow pipe re-route Provided new route,P2426,P2326,P2126 - M-E Engineers 1806 Relocated MECh screen skecthes reloacting screen,A2604 Fentress Architects Provided sketches show new route,P2124,P2224,P2334, 1809.2 Storm Line re-route-existing conditions P2424 M-E Engineers • Wall and structure adjustnment for AHU supprt and 1861.2 clearance in Area 7 Provided sketches,A2207 Fentress Architects 1868 Re-routed storm riser due to conflict with GB Provided sketches,P2030,P2130,P2230 M-E Engineers 1869 Wall removal approved,A2107 Fentress Architects SW loading dock ramp redesign and chilled water 1887.2 Provided sketches,A2128,A9208,S2128,S3309,S3102 Fentress/Wallace pipeing 1894.2 FVC ADA protection for surface mounted cabinnets Provided general sketch,East Service cooridor Fentress Architects Provided Sketches,S2419,S5524,P2029,P2119,P2124, Re-routed overflow drains and adjusted structure 1901 due to existing conditions P2129,P2130,P2219,P2229,P2230,P2319,P2324,P2329, M-E Engineers/WE P2330,P2418,P2419 1936.5 Condelets south dock Fentress Architects 1940.1 Dock bumpers Added detail 14/A9105 Fentress Architects 1961-1961,1 Bin Washing re=design Provided Sketches,P0002,P2027,P2127,P8001, M-E Engineers 1971 Fuel Oil Lines re-route Provided Sketches,MP2028,MP2128,MP2228,MP2428 M-E Engineers 2019.1 South Dock storm drain redesign Provided Sketches,P2028,P2128 M-E Engineers 2064 Kitchen Vent Line relocation due to conflicts w/WIC Provided Sketches,P3010,P3010 M-E Engineers 2083.1-2083,3 Chiller plant pipe support Provided details Wallace 2099&2099.2 Chase for and roof detail for generator exhaust Sketches,A2228,A2604,A7216 Fentress Architects 2215 Wall infill sketch Put sketch on drawings Fentress Architects 2242 Wall moved,arch and struct sketch Put sketch on drawings Fentress Architects/WE 2244 RCP revision for helix beam Put sketch on drawings Fentress Architects • 2250 Plumbing sketch for pantry water line Put sketch on drawings ME-P 2259 Wall anchor location revisions Put sketch on drawings Fentress Architects/WE 2270 Elec/Plbg revisions for handsink relocation,sketches Put sketch on drawings ME-E/P 2285 Wall type revision to match door jamb sketch Put sketch on drawings Fentress Architects 2289 Elec room relocation w/storage room Put sketch on drawings Fentress Architects 2289.1 Mech revisions Put sketch on drawings ME-M 2292 Floor transition detail revision sketch Put sketch on drawings Fentress Architects 2294 Shaft wall jog detail sketch Put sketch on drawings Fentress Architects compiled by Hill International,Inc. RFI Response Follow-Up Miami Beach Convention Center 3/22/2019 - 2300 MEP wall angle change Model change Fentress Architects • Reroute of telecom and plumbing lines at 5th floor 2307.1 TR room Put sketch on drawings Fentress Architects/DLA/ME-P 2311 Transformer location established ME-E 2332 Overflow reroute sketches Put sketch on drawings ME-P 2338.1 Soffit reduction sketch Put sketch on drawings Fentress Architects Floor drain/sink relocations at existing chiller slab; 2363/.3 SK-markup ME-P structural detail 2370.1 Ballroom partition soffit revision sketch Put sketch on drawings Fentress Architects 2422 Elevated slab curb detail sketch Put sketch on drawings Fentress Architects 2444 Fire valve cabinets surFentress Architectsce 7 Fentress Architects mounted vs recessed 2458.2 Camera relocations-written ? DLA 2483 Clerestory sill waterproofing detail revision sketch Put sketch on drawings Fentress Architects 2491 Fan coil unit relocation SK-markup ME-M 2499 Column mounted conduit removal ? ME-E 2521 Exhaust Fentress Architectsn relocation GL 18 ? ME-M 2547 Revised toilet accessory location sketch Put sketch on drawings Fentress Architects Alternate connection detail at louver and horizontal 2554 girt sketches Put sketch on drawings Fentress Architects 2556 OH door height revision ? Fentress Architects • 2563 Wall relocations and toilet accessory shift sketches Put sketch on drawings Fentress Architects 2577 North dock grates removed in submittal SK-markup Fentress Architects 2592 Toilet accessory relocation sketches Put sketch on drawings Fentress Architects 2593.1 Column wrap revision sketch Put sketch on drawings Fentress Architects 2619.1 New natural gas lines replacing old-gas loads SK-markup ME-P shown in markup Top of wall elevation revised;proposed duct 2630.1 Put sketch on drawings Fentress Architects . routing 2639 Gravity vent detail added Put sketch on drawings Fentress Architects Fence added around FCU where sprinkler is too low 2663.3 at 2nd floor corridor,sketch SK-markup Fentress Architects 2671 Expansion joint revision on elevation sketch Put sketch on drawings Fentress Architects 2673 Enclose exposed conduit in existing stairs ? Fentress Architects 2681 Electrical room layout change,wall and duct Put sketch on drawings Fentress Architects/ME-M revision sketches 2690.1 Revised EOS dimension at Ivl 2 ramp around helix Put sketch on drawings Fentress Architects 2709 Column enclosure revision sketch Put sketch on drawings Fentress Architects 2711.1 Roof expansion joint detail revision sketch Put sketch on drawings Fentress Architects 2714 Parking light relocated to match structural Model change Fentress Architects compiled by Hill International,Inc. RFI Response Follow-Up Miami Beach Convention Center 3/22/2019 2715 North dock slab elevations revised in sketch Put sketch on drawings Fentress Architects 2716.1 Revised toilet accessory location sketch Put sketch on drawings Fentress Architects • 2756 Parking light pole pedestal locations and detail Put sketch on drawings Fentress Architects sketches 2771 G line fix series of sketches Put sketch on drawings Fentress Architects 2773 Shear wall penetration opening revisions Put sketch on drawings Fentress Architects 2792.1 Duct size change sketches Put sketch on drawings M-E Engineers 2799 West pod wall type change sketch Put sketch on drawings Fentress Architects 2800.1 Emergency electrical panel revision at catwalk ? M-E Engineers 2801 G line differing site conditions RFI series of sketches Put sketch on drawings Fentress Architects 2814.1 Roof anchor modification sketches Put sketch on drawings Fentress Architects 2827 Bridge steel infill sketches Put sketch on drawings Fentress Architects 2836/.1 Area 26 door hardware revisions ? Fentress Architects 2847.1 OH door connection detail sketches Put sketch on drawings Fentress Architects 2853 North terrace handrail detail sketch Put sketch on drawings Fentress Architects 2859 Transformer closet added in existing kitchen sketch Put sketch on drawings Fentress Architects 2865 Wall type change ? Fentress Architects 2878 Diffuser change at level 4 restrooms Put sketch on drawings ME-M 2892 Gate pedestal location sketches Put sketch on drawings Fentress Architects 2905 Flipping of TR room TCWW17 to accomodate floor Update plan Adams elevation discrepancy 2949 Removed 3 light fxtures Update plan M-E Engineers 2966 Wall change at overhead doors Update plan Fentress Architects 2973 Revise fire alarm devices Update plan Jensen Hughes • 2985 Parapet wall detail Update plan Fentress/Wallace 2986.1 CCD 23 connection shear values Update plan Wallace • 3003 Lauren IaBella adds circuits Provided in SCS INT REV I(E0088) - M-E Engineers 5.25.17 Existing drywall was mistakenly demolished and 3024 then replaced Replace walls per the attached pdfs. See also RFI 3024.1 Fentress Architects 5.19.17 3037 Per fire inspection 13 sprinkler are not required Juan Carlos Hernandez agrees for conditins as indicated in based on durrent building conditions. the attached overlays. Jensen Hughes/Clark 5.25.17 Clarifications are provided for the location of ADA - Locate bollards as indicated on attached sketches. Fentress Architects 6.06.17 3065.1 bollards. 3089 Per the plumbing inspectors comments,provide a Brandon Dark takes no exception to the location of the valve shut off balve where shown. per the inspector's comments. M-E Engineers 8.01.17 Ceiling in corridor is too low for mounting fire alarm Juan Carlos Hernandez agrees the devices should move to no 3137 devices. AHJ and Fire Marshall require devicesJensen Hughes/Clark 6.26.17 more than 12"from the ceiling. move to walls. compiled by Hill International,Inc. RFI Response Follow-Up Miami Beach Convention Center 3/22/2019 3141 Per the AHJ,additional devices need to be added to Juan Carlos indicates devices not required,but Fentress Jensen Hughes/Clark 7.12.17 the Fire Alarm System. Architects notes that the AHJ has final authority. Existing hangers are rotated 90 degrees from those Kevin Fitzpatrick confirms the columns are rotated and 3202 Wallace 6.27.17 shown on the design drawings. provides details of the connections. Interferences with ducint prevented lights from Each of the fixtures was observed outputting the required 3205 being located per the design drawings. illumination,but the lenses need to be re-oriented and M-E Engineers 7.14.17 shown on the documents as installed. Piping needs to move outside of the elevator Refer to the response from J.Tessman for new piping 3248 control room per code. locations. M E Engineers 7.11.17 Storm piping needs to be relocated to avoid Green Refer to the response from J.Tessman for new piping 3265 Rooms locations. M-E Engineers 7.20.17 3280 Bollards at east service corridor Revised sheet A2106,A2111,A2121,A2126 Fentress Architects DONE Provide clarification to the CMU at Stair 4.19.01 due Proceed with the Structural layout and coordinate handrails 3386 to differeences between Architectural and Fentress Architects 8.24.17 to accommodate the shift in the wall location. Structural drawings. Sketches are provided by the contractor for J.Tessmen confirms the rerouting as shown on the 3387 rerouting the piping in the 2 areas noted. contractor's 3 sketch. Reducing the pipe sizes is agreed to be M-E Engineers 8.30.17 acceptable. In 4 issuances of this RFI,the mechanical diffusers Fentress issues numerous sketches to clarify the diffuser, 3390 and soffits are revised to clarify all conditions Fentress Architects 12.24.17 window shades,and soffit conditions. adjacent to curtainwalls. Advise if acceptable to delete door based on Door may be deleted based on confirmed largest panel in 3405 electrical requirements. room. Fentress Architects 8.23.17 Clarification is required to provide additional E.Myers request beams be added under the radiator post supports. R.Chessmore indicates the penetrations and 3431 support for the horixontally stacked generatorFentress and Wallace 9.13.17 supports need to be per manuFentress Architectscturer's remote radiator units. details,and theP�P� g i in needs to be insulated. Clarifications are needed for the bellows expansion Z.Munoz provides narrative solution for the locations and 3450 joints running down the existing parapet with the details for the expansion joints. Fentress Architects 9.06.17 new ramp. Existing expansion joint near K Line does not exist 3455 and requires clarification. R Chessmore indicates the expansion joint is needed. Fentress Architects 9.06.17 There is a potential conflict at the storm pipe that will 3497 Clarification is required to adjust the location of the require an adjustment to the location of the operable Fentress Architects 10.05.17 operable partition to clear storm pipe. partition. Contractor to add a track leg outside the storage panel pocket. 3518 Additional coolant lines are necessary for routing R.Chessmore provides locations for routing the additional M-E Engineers 10.06.17 from the generators up to the remote radiators. coolant lines. 3550 Requested design drawing update included in RFI Will be included in Rev M sheets MP 2028 and MP 2029,MP response 2128,MP 2129,and M 60006 M E Engineers • compiled by Hill International,Inc. RFI Response Follow-Up Miami Beach Convention Center 3/22/2019 This is a minor change to eliminate a redundant Updated detail to be provided in Rev M for sheet E3418 3576 light switch. elimination od a redundant light switch M-E Engineers There is no alarm sequence for these door as the 3596 connection to the fire alarm was eliminated in this Updated detail to be provided in Rev M Jensen Hughes RFI This is a simple direction to provide a return air Updated detail to be provided in Rev M Update drawing to 3622 opening. show return air opening M-E Engineers 3420 CMU Wall reinforcement detail modified for Updated detail to be provided in Rev M Wallace exterior wall This will be discussed internally with Mr.Candelario Relocated fire alarm will be reissued I when issue is resolved 3573 and Elier to make sure it M-E Engineersts Code STILL by contractor.Wiring issue to be solved be subcontractor Jensen Hughes/Clark UNRESOLVED WITH AHJ 3651.3 Are there any further space issues? Updated detail to be provided in Rev M Wallace 3662 Added closet at VIP Ballroom Fentress Architects 3691 Updated details to be provided in Rev M Wallace 83690 Updated detail to be provided in Rev M Wallace 3847 (No further action is needed here) Emergency Revise control on drawings on M2128 and M2129 M-E Engineers Generator exhaust Fentress Architectsn control 3867 NCR for Floor gap WP Moore solution Will add note refrencing alternate detail provided in RFI on Wallace Structural Drawings 4164 Add damper to drawings M-E Engineers The stamped sketches provided were modifications to details 4199 already on drawings sheets.(10/A7411,11/A7411, Fentress Architects 12/A7411).Will include in Rev M The approved solution that was provided was stamped and 4203 sealed by the contractor's engineer. Will add note refrencing Wallace alternate detail provided in RFI on Structural Drawings For RFI series 4205 the contractor proposed solution was 4205 stamped and sealed by the contractor's engineer.Will add Wallace note refrencing alternate detail provided in RFI on Structural Drawings Revision to detail 5/A7514. Revision to sheet A2225 for new 4278 Glass rail delegated design 5&S-Glass rail revised Fentress Architects detail callout. New detail 9/A7514 added. Alternate top of wall detail.Will add note refrencing 4303 Fentress-this detail needs to make it on to the plans Wallace alternate detail provided in RFI on Structural Drawings 4318 Fentress this detail needs to make it on to the plans Detail will be added to structural plans Wallace -Detail will be added to plans 4379 Clark to confirm if Mc Dean Revisions have been included on the Permitted drawings OPEN/CLARK Will be included in Rev M M-E Engineers compiled by Hill International,Inc. RFI Response Follow-Up Miami Beach Convention Center 3/22/2019 4390 Sumps changed from two to one due to contractor Will revise drawing M-E Engineers omission Electrical showed connections for roller shades that „ • 4391 M-E Engineers were not necessary,connections omitted 4393 Solid interceptors added. M-E Engineers 4414.2 Ramp added at Grand Ballroom lobby due to NCR „ W8 on precast bench elevations Light fixture omitted due to conflict with sprinkler „ 4419 M-E Engineers line 4431 Added wall for fire protection to due to contractor Revsion to detail 6/A2823. Added detail 4/A6226. Fentress Architects not building portion of slab 4438 Manual balancing dampers added at mechanical M-E Engineers room 4447+iterations Added guardrails at escalator. Revision to detail 11/A9107. Fentress Architects Lights were eliminated below the stair because they „ 4448 were not fire rated M-E Engineers 4452 Relocation of various outlets at AV Command Room " M-E Engineers 4454 Guardrail walls were omitted and replaced with W8 guardrails 4465 Added breakers and circuiting,reference to RFI M-E Engineers 4327 where the work was done 4472.2 NW Corner curb ramp,crosswalk&existing Redesign of NW corner sidewalk KH 4473 Circuit was swapped to non-GFCI M-E Engineers 4476 Lights were re-circuited due to P-lot descope M-E Engineers 4481 Extra exit signs added per fire department M-E Engineers comments 4486 Alternative feeder at transformer M-E Engineers 4519 Added lights at elevator shaft per AHJ M-E Engineers 4520 Added duplexes for oil coolers at elevator M-E Engineers 4520.1 Provided circuit numbers for oil coolers M-E Engineers 4525 Wall added at shear wall infill Revised sheet 2227 Fentress Architects 4536 Changes to fuses and wire sizes M-E Engineers 4537 RCP for parking office issued for the first time Sheet 3708 revised Fentress Architects Added detail 9/A7110. Revised sheets A2129&A2130 to 4563 Added bollards at downspouts on south Fentress Architects add callout for new detail 4581 AHJ request to shift exit signs M-E Engineers 4598 Ceiling in Janitor's Closet 1.08.10 Fentress Architects 4599 FEC&FVC labeling Fentress Architects 4602 Exterior Storefront ADA Door Requirement Conflict M-E Engineers • 4603.1 Kitchen Hood Conflict Fentress Architects _ 4606 Escalator 08.01 Skirt Panel Detai Clarification Fentress Architects compiled by Hill International,Inc. RFI Response Follow-Up Miami Beach Convention Center 3/22/2019 4610 Electrical Panel Confirmation M-E Engineers 4611 North Loading Dock Leveler Power Clarification M-E Engineers 4618 Area 28 Level 1 Tunnel-Shaft Ceiling Alternate Fentress Architects 4620 Inspector Requested Additional Bollards Revised sheet A2102,A2103,A2104,A2114,A2124,A2107, Fentress Architects DONE A2127 • compiled by Hill International,Inc.