Loading...
Resolution 2019-30849 RESOLUTION NO. 2019-30849 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO. 1 TO THE CONSTRUCTION CONTRACT IQC NO. FLO4GC4-051716-LCI BETWEEN THE CITY OF MIAMI BEACH, FLORIDA, AND LEE CONSTRUCTION GROUP, INC., FOR ADDITIONAL STRUCTURAL, ELECTRICAL, AND FIRE ALARM SCOPE FOR THE PROPERTY MANAGEMENT EMERGENCY GENERATOR, IN AN AMOUNT OF $93,042.16, PLUS A 10% OWNER'S CONTINGENCY IN THE AMOUNT OF $9,304.21, FOR A TOTAL AMOUNT OF $102,346.37; WITH THE FOREGOING SUBJECT TO AND CONTINGENT UPON CITY COMMISSION APPROVAL OF A CAPITAL BUDGET AMENDMENT REQUIRED TO FUND CHANGE ORDER NO. 1. WHEREAS, the City needs to install one (1) emergency generator at the Property Management Department (the Project); and WHEREAS the Project consists of one (1) 500KW generator, as well as a number of ancillary items (e.g., automatic transfer switch); and WHEREAS, the National Joint Powers Alliance (NJPA), now known as Sourcewell, a national cooperative that bids contracts aggregating the spend volume of agencies across the country, awarded Contract No. 071415-GGI for IQC construction services, and said contract includes an award to Lee Construction Group, Inc., through the Gordian Group's IQC process, to provide services to the City pursuant to the contract; and WHEREAS, on February 14, 2019, after negotiations, the Contractor submitted a bid proposal in the amount of $248,000.00, for the Project plus an additional $19,143.74 owner contingency; and WHEREAS, on March 13, 2019, the Mayor and City Commission adopted Resolution No. 2019-30740, authorizing the City Manager to execute a work order with Lee Construction Group, Inc., utilizing the competitive bid Sourcewell cooperative contract for construction services; WHEREAS, due to unforeseen conditions, the City and the engineer of record, TLC Engineering, Inc., have identified additional work that needs to be performed, including modifications to the concrete pad to meet flood base elevation, fire alarm, and electrical changes; and WHEREAS, on April 23, 2019, after negotiations, the Contractor submitted a Change Order proposal in the amount of $93,042.16, plus a 10% owner's contingency in the amount of $9,304.21, for a total amount of$102,346.37; and WHEREAS, the Administration recommends approval of the Change Order proposal, as the proposal has been reviewed by staff, the engineer of record, and the Gordian Group, and determined to be reasonable and fair. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA that the Mayor and City Commission hereby approve and authorize the City Manager to execute Change Order No. 1 to the construction contract IQC No. FLO4GC4-051716-LCI between the City Of Miami Beach, Florida, and Lee Construction Group, Inc., for additional structural, electrical, and fire alarm scope for the Property Management Emergency Generator and Transfer Switch Project, in an amount of $93,042.16, plus a 10% owner's contingency in the amount of $9,304.21, for a total amount of $102,346.37; with the foregoing subject to and contingent upon City Commission approval of a Capital Budget amendment required to fund Change Order no. 1. PASSED and ADOPTED this day of76+ne.- , 2019. ATTEST: Dan Gelber, Mayor J`s d 4t La19 Rafal E. Gr -:•••, City Clerk APPROVED AS TO FORM &LANGUAGE • gip !! Be9c ,, &FOR EXECUTION .9 *IACOR ORATED Zt*tati\-- —lq. - §-2�C tigi:t r..:•�°�- -CCity Attorney ^ 1 Date CN 26e u -1 Resolutions - C7 N MIAMI BEACH COMMISSION MEMORANDUM TO: Honorable Mayor and Members of the City Commission FROM: Jimmy L. Morales, City Manager DATE: June 5, 2019 SUBJECT:A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO. 1 TO THE CONSTRUCTION CONTRACT IQC NO. FLO4GC4-051716-LCI BETWEEN THE CITY OF MIAMI BEACH, FLORIDA, AND LEE CONSTRUCTION GROUP, INC., FOR ADDITIONAL STRUCTURAL, ELECTRICAL, AND FIRE ALARM SCOPE FOR THE PROPERTY MANAGEMENT EMERGENCY GENERATOR, IN AN AMOUNT OF $93,042.16, PLUS A 10% OWNER'S CONTINGENCY IN THE AMOUNT OF $9,304.21, FOR A TOTAL AMOUNT OF $102,346.37; WITH THE FOREGOING SUBJECT TO AND CONTINGENT UPON CITY COMMISSION APPROVAL OF A CAPITAL BUDGET AMENDMENT REQUIRED TO FUND CHANGE ORDER NO. 1. RECOMMENDATION The Administration recommends approval of the Resolution. ANALYSIS On February 1, 2018, the City engaged TLC Engineering, Inc. for the engineering services and design of the Property Management emergency generator(the"Project"). In the interest of time, the City chose to expedite the Project and utilize the IQC process. Through the IQC process, Lee Construction, Inc. ("Contractor") was identified as the most qualified and experienced contractor to complete the identified scope per TLC Engineering, Inc. construction documents. The City and the Gordian Group met with the Contractor to review the scope for the Project. On on February 14, 2019, after negotiations, the Contractor submitted a bid proposal in the amount of$248,000.00, for the Project plus an additional $19,143.74 owner contingency. Due to unforeseen conditions such as the requirement to relocate the automatic transfer switch, elevate the concrete platform to 3'-6" above base flood elevation, increase in the size of the concrete pad three times it's original size to accommodate the transfer switch relocation, as well as fire alarm, and electrical changes in compliance with the current Florida Building Code. The scope work depicted above was not captured in the original bid set documents. Page 444 of 868 On April 23, 2019, the Contractor submitted a change order proposal in the amount of $93,042.16, for the additional work, plus a 10% owner's contingency, for a total amount of $102,346.37. The proposal was reviewed by the engineer of record, and the Gordian Group, and determined to be reasonable and fair. CONCLUSION The Administration recommends that the Mayor and City Commission approve and authorize the City Manager to execute change order No. 1 to the construction contract IQC work order No. 062105.01 between The City Of Miami Beach, Florida, and Lee Construction Group, Inc., for additional structural, electrical, and fire alarm repairs for the Property Management emergency generator, in an amount of $93,042.16, plus a 10% owner's contingency in the amount of $9,304.21, for a total amount of $102,346.37; and subject to a capital budget amendment required to fund change order No. 1. FINANCIAL INFORMATION Legislative Tracking Property Management ATTACHMENTS: Description ❑ Change Order Proposal ❑ Resolution Page 445 of 868 711 rik a 0.- Lill• Work Order Signature Document THE GORDIAN GROUP NJPA EZIQC Contract No.: FLO4GC4-051716-LCI New Work Order X Modify an Existing Work Order Work Order Number.: 062105.01 Work Order Date: 04/23/2019 Work Order Title: Miami Beach Property Management Office New Generator Supplemental Owner Name: City of Miami Beach Contractor Name: LEE Construction Group. Inc. Contact: Adrian Morales Contact: Luis Enriquez Phone: 305-673-7000 Phone: (305)216-4054 Work to be Performed �. Work to be performed as per the Final Detailed Scope of Work Attached and as per the terms and conditions of NJPA EZIQC Contract No FLO4GC4-051716-LCI. Brief Work Order Description: i Additional scope based on latest plans: Electrical; Fire Alarm; Concrete work-prefab stairs/door and platform;and Structural. Time of Performance Estimated Start Date: Estimated Completion Date: Liquidated Damages Will apply: Ft Will not apply: X Work Order Firm Fixed Price: $93,042.16 .Owner Purchase Order Number: Approvals Owner Date Contractor Date Work Order Signature Document Page 1 of 1 4/23/2019 Page 446 of 868 Wit®11QC THE GORDIAN GROUP Detailed Scope of Work To: Luis Enriquez From: Adrian Morales LEE Construction Group. Inc. City of Miami Beach• 9485 NW 12th Street 1700 Convention Center Drive Doral, FL 33172 Miami Beach, FL 33139 (305)216-4054 305-673-7000 Date Printed: April 23, 2019 Work Order Number: 062105.01 Work Order Title: Miami Beach Property Management Office New Generator Supplemental Brief Scope: Additional scope based on latest plans: Electrical; Fire Alarm; Concrete work- prefab stairs/door and platform;and Structural. • Preliminary n Revised n Final The following items detail the scope of work as discussed at the site.All requirements necessary to accomplish the items set forth below shall be considered part of this scope of work. Scope includes:Added cost of new Kohler Generator; changes to the electrical scope and added fire alarm work; added structural work; and added cost for the prefab stairs/door and platform as new housekeeping pad is approximately 3x the size. Subject to the terms and conditions of JOC Contract FLO4GC4-051716-LCI. Contractor Date Owner Date Scope of Work Page 1 of 1 4/23/2019 Page 447 of 868 Contractor's Price Proposal - Summary Date: April 23,2019 Re: IQC Master Contract#: FLO4GC4-051716-LCI • Work Order#: 062105.01 Owner PO#: Title: Miami Beach Property Management Office New Generator Supplemental Contractor: LEE Construction Group.Inc. Proposal Value: $93,042.16 Section-01 $9,037.06 Section-03 $19,571.70 Section-04 $3,426.84 Section-05 $30,931.76 Section-21 $486.80 Section-28 $3,466.38 Section-31 $9,192.62 Section-32 $16,929.00 Proposal Total $93,042.16 Thisl total represents the correct total for the proposal. Any discrepancy between line totals, sub-totals and the proposal total is due to rounding. The Percentage of NPP on this Proposal: • • Contractor's Price Proposal-Summary Page 1 of 1 4/23/2019 Page 448 of 868 Contractor's Price Proposal - Detail Date: April_23,2019 Re: IQC Master Contract#: FLO4GC4-051716-LCI Work Order#: 062105.01 Owner PO#: Title: Miami Beach Property Management Office New Generator Supplemental Contractor: LEE Construction Group.Inc. Proposal Value: $93,042.16 Sect. Item Mod. UOM Description Line Total Labor Equip. Material (Excludes) Section-01 1 01 22 20 00 0049 HR Investigating Senior Engineer Or Specialty ConsultantFor special investigatory $5,937.00 engineering requirements or other miscellaneous professional services. Quantity Unit Price Factor Total Installation40.00 x 125.00 x 1.1874 - 5,937.00 recertfy/reprogram fire alarm.includes 24 hours for design and engineering of additional fire alarm work 2 01 45 23 00 0011 EA Proctor Compaction 4"Standard Mold ASTM D698,Field Soils Test $841.49 Quantity Unit Price Factor Total Installation4.00 x 177.17 x 1.1874 = 841.49 extra proctortests for increased slab/structural work 3 01 71 13 00 0003 EA Equipment Delivery,Pickup,Mobilization And Demobilization Using A Tractor $511.53 Trailer With Up To 53'Bedlncludes delivery of equipment,off loading on site, rigging,dismantling,loading and transporting away.For equipment such as bulldozers,motor scrapers,hydraulic excavators,gradalls,road graders, loader-backhoes,heavy duty construction loaders,tractors,pavers,rollers, bridge finishers,straight mast construction forklifts,telescoping boom rough terrain construction forklifts,telescoping and articulating boom manlifts with >40'boom lengths,etc. Quantity Unit Price Factor Total Installation1.00 x 430.80 x 1.1874 - 511.53 equipment mobilization for reoval of existing fill/loading for hauling 4 01 74 19 00 0015 EA 30 CY Dumpster(5 Ton)"Construction Debris"Includes delivery of dumpster, $913.49 rental cost,pick-up cost,hauling,and disposal fee.Non-hazardous material. Quantity Unit Price Factor Total Installation1.00 x 769.32 x 1.1874 - 913.49 additional dumpster for added debris removal 5 01 74 19 00 0036 CYM Hauling On Paved Roads,Miles Over Initial 15 Miles $833.55 Quantity Unit Price Factor Total Installation1,800.00 x 0.39 x 1.1874 = 833.55 hauling of additional material required for pad Subtotal for Section-01 $9,037.06 Section-03 6 03 11 13 00 0026 SF Elevated Slab Wood Formwork $1,010.95 Quantity Unit Price Factor Total Installation180.00 x 4.73 x 1.1874 = 1,010.95 additional form work for increased slab/structural work 7 03 11 13 00 0026 0008 MOD For<1,006,Add $170.99 Quantity Unit Price Factor Total Installation180.00 x 0.80 x 1.1874 170.99 • Contractor's Price Proposal-Detail Page 1 of 4 4/23/2019 Page 449 of 868 Contractor's Price Proposal - Detail Continues.. Work Order Number: 062105.01 ( Work Order Title: Miami Beach Property Management Office New Generator Supplemental Section-03 8 03 21 11 00 0130 LF #6,Grade 60,Slab On Grade,Steel Reinforcement Bar $11,205.97 Quantity Unit Price Factor Total Installation6,420.00 x 1.47 x 1.1874 - 11,205.97 • additional reinforcement for revised structural work 9 03 31 13 00 0018 CY Direct Chute,Place 3,000 PSI Concrete Continuous Footings $4,390.41 Quantity Unit Price Factor Total Installation30.00 x 123.25 x 1.1874 = 4,390.41 additional concrete for equipment pad 10 03 31 13 00 0018 0033 MOD For 4,000 PSI Concrete,Add $327.72 Quantity Unit Price Factor Total Installation30.00 x 9.20 x 1.1874 = 327.72 11 03 31 13 00 0018 0043 MOD For> 0`To 50,Add $86.92 Quantity Unit Price Factor Total Installation30.00 x 2.44 x 1.1874 = 86.92 12 03 31 13 00 0104 HR 35 CY/HR,66 HP Trailer Mounted Concrete Pumpincludes hoses $1,543.62 Quantity Unit Price Factor Total Installation16.00 x 81.25 x 1.1874 = 1,543.62 pumping for additional stuctural work based on revisions.2 pours needed x 8 hours each 13 03 61 16 00 0002 CY Cementitious Flowable Grout $835.12 • Quantity Unit Price Factor Total • Installation3.00 x 234.44 x 1.1874 = 835.12 grout fill cells Subtotal for Section-03 $19,571.70 ' Section-04 14 04 22 23 13 0006 SF 8"x 16"x 8",Regular,Back-Up Concrete Block $3,426.84 Quantity Unit Price Factor Total Installation390.00 x 7.40 x 1.1874 = 3,426.84 foundation wall for generator pads Subtotal for Section-04 $3,426.84• Section-05 15 05 05 19 00 0034 EA 7/8"Diameter x 10"Length,Zinc Plated Steel,Wedge Anchor Expansion Bolt $439.43 Quantity Unit Price Factor Total Installation =16.00 x 23.13 x 1.1874 439.43 provide expansion bolts on pad 16 05 05 19 00 0034 0195 MOD For>10 To 50,Deduct -$10.26 Quantity Unit Price Factor Total Installation -10.2616.00 x -0.54 x 1.1874 = 17 05 53 13 00 0077 SF 2-1/2"x 3/16",20.0 LB/SF,Steel,Riveted Grating $7,361.76 Quantity Unit Price Factor Total Installation70.00 x 88.57 x 1.1874 = 7,361.76 provide platform for generator 18 05 53 13 00 0077 0133 MOD For Galvanized Steel,Add $348.26 Quantity Unit Price Factor Total Installation70.00 x 4.19 x 1.1874 = 348.26 • Contractor's Price Proposal-Detail Page 2 of 4 4/23/2019 Page 450 of 868 Contractor's Price Proposal - Detail Continues.. Work Order Number: 062105.01 , Work Order Title: Miami Beach Property Management Office New Generator Supplemental Section-05 19 05 58 23 00 0016 EA 42"Height,Triple Rail Post For 2-Rib Guard Rails $7,109.32 Quantity Unit Price Factor Total Installation22.00 x . 272.15 x 1.1874 = 7,109.32 provide guardrails around walking platfrom 20 05 59 67 00 0004 EA Furnish And Install 28"Steps,Landing And Railings $15,683.25 Quantity Unit Price Factor Total Installation2 00 x 6,604.03 x 1.1874 = 15,683.25 provide stairs and landings at pad area for an elevation of 4-5'in height Subtotal for Section-05 $30,931.76 Section-21 21 21 23 16 00 0196 ' . EA Emergency Stop Station For Relay Control Pariel-(Asco 173A19) $486.80 Quantity Unit Price Factor Total Installation1.00 x 409.97 x 1.1874 = 486.80 provide emergency shut off for generator Subtotal for Section-21 $486.80 Section-28 22 28 31 23 00 0908 EA Annunciator,Network Control.(Johnson Controls,Inc.#JNCA) $2,199.80 Quantity Unit Price Factor Total Installation100 x 1,852.62 x 1.1874 2,199.80 provide Annunciator panel for fuel tank monitoring 23 28 31 23 00 1454 EA Intelligent Addressable Dual Monitor/Dual Relay Module(Notifier FDRM-1) $1,266.58 , Quantity Unit Price Factor Total Installation4 00 x 266.67 x • 1.1874 = 1,266.58 provide monitor modules for fire alarm system as per note#16 Subtotal for Section-28 $3,466.38 Section-31 24 31 23 16 36 0010 CY Excavation For Building Foundations And Other Structures By Hand in Loose $2,428.71 Rock Quantity Unit Price Factor Total Installation30.00 x 68.18 x 1.1874 = 2,428.71 excavation of existing fill for larger generator pad 25 31 23 16 36 0019 CY Backfilling Around Building Foundations And Other Structures By Hand $2,697.30 Quantity Unit Price Factor Total Installation120.00 x 18.93 x 1.1874 - 2,697.30 additional earthwork for increased structural work 26 31 23 16 36 0022 CY Compaction Of Fill Or Subbase For Building Foundations and Other Structures $1,773.98 by Hand Quantity Unit Price Factor Total Installation 120.00 x 12.45 x, 1.1874 - 1,773.98 additional earthwork for increased structural work 27 31 23 16 36 0032 CY Spread Excess Or Imported Material On Site By Hand $2,292.63 Quantity Unit Price Factor Total Installation120.00 x 16.09 x 1.1874 = 2.292.63 additional earthwork for increased structural work Subtotal for Section-31 $9,192.62 Contractor's Price Proposal-Detail Page 3 of 4 4/23/2019 Page 451 of 868 Contractor's Price Proposal - Detail Continues.. Work Order Number: 062105.01 Work Order Title: Miami Beach Property Management Office New Generator Supplemental Section-32 28 32 11 26 19 0002 CY Bituminous Stabilized Base Course3/4"ASTM C33. $16,929.00 Quantity Unit Price Factor Total Installation120.00 X 118.81 X 1.1874 = 16,929.00 provide additional fill for revised structural work • Subtotal for Section-32 $16,929.00 Proposal Total ' $93,042.16 This total represents the correct total for the proposal. Any discrepancy between line totals, sub-totals and the proposal total is due to rounding. The Percentage of NPP on this Proposal: • • Contractor's Price Proposal-Detail Page 4 of 4 4/23/2019 Page 452 of 868 Subcontractor Listing THE GORDIAN GROUP Date: April 23,2019 Re: IQC Master Contract#: FL04GC4-051716-LCI Work Order#: 062105.01 Owner PO#: Title: Miami Beach Property Management Office New Generator Supplemental Contractor: LEE Construction Group.Inc. Proposal Value: $93,042.16 Name of Contractor Duties Amount No Subcontractors have been $0.00 0.00 selected for this Work Order • • Subcontractor Listing Page 1 of 1 4/23/2019 Page 453 of 868