Change Order No. 3B • �� 18-3c�c�s�
i\-A I A- : I BE- CF-I West Avenue-Phase II Improvements
PROJECT NAME`. South of:14th St.
. A/E CONSULTANT: CES Consultants Inc:
CONTRACTOR: Ric Man Construction Florida; c
RPR/CEI: Chen Moore and Associa
tes; Inc.
: CHANGE ORDER NO. 3B.. :.DATE :06/28/201
YOU are hereby directed to make the following changes tothe Contract'Documents:
DESCRIPTION OF This Change Order will provide funding to the Design/Builder:for the costs escalation of Materials;Salaries and
CHANGE: Labor,aswell as the proposed costs of the following items:. .
*Emergency Generators for 3 existing Pump Stations'at 5th:St:,6th St 10th'St:(2 ea:): : : .
*Resurfacing of Alton Court from 8th St'to 14th St. • •
-
*Resurfacing; Milling and Striping of West Ave:from 6th.St.to 8th St.
*Expansion of basinlimit from 6th St:to 8th St to upgrade design to accommodate a 10 year
storm event:
:*Concrete Sidewalk on North side.of 6th St.between West Ave.:and Alton Rd. . .
*Arborist Services for the evaluation of existing trees,canopy replacement and landscaping.
*Utility Corridor end:roadway enhancement,landscaping and 10th Street Street-end
:. *Owner's Contingencyof 10%,in the amount.of$597,000.00 is included .
These costs were identified and approved by the City Commission during their December meeting under
Resolution number 2018-30653.
Anon-compensatory Change Order will follow in Order to address the adjustment of ContractDuration.
REASON FOR . • •Owner Requested additional scope,as identified during the ULI Resiliency effort-Accelerator and Design Criteria.
CHANGE:.. enhancements . . .
CLASSIFICATION::-. Owner Directed IF OTHER: NA..
•
CHANGE IN CONTRACT SUM : : CHANGE IN CONTRACT TIME:.
Contract Sum: $12,809;754.10 .Original.Contract Time to Substantial
Original 545 DAYS
Completion:. . . ..
Net chan9e bypreviously . Net change from previous Change
$1.,821,453:85 30 DAYS
authorized Change Orders:. ' : . . . . . • . Orders:.
Contract'Sum prior to thisContract Time to' .Substantial
Change Order: : $14;631,207:85 Completion prior to this Change: 575. DAYS
Order is:
Contract Sum will be • • • • • Contract Time will be
increased/decreased by this $6;213,895.00 increased/decreased .by the 0 DAYS •
Change Order in the amount '
of: following calendar days:
New Contract Sum including this New Contract Time.to Substantial
. $20,845;102:85 575 DAYS.
Change Order is: . . . . . -_ . .. Completion is: .. • .
IF NO ADJUSTMENTS IS MADE,THE CONTRACT AMOUNT REMAINS UNCHANGED.
ADJUSTMENTS TO TIME FOR PERFORMANCE:.In connection with the change(s)noted in this document;CONTRACTOR'S TIME FOR PERFORMANCE
REMAINS UNCHANGED unless specifically noted herein.
This Change Order is an amendment to the Agreement between the Contractor and City. The amount and time change designated herein are the maximum agreed to by
both the City and Contractor for this Change Order. Contractor attests that the Contract adjustment provided herein is reasonable,and constitutes:compensation in full
for all costs,claims;markup;and expenses,director indirect,attributable to this or any other prior Change Orders,ancluding but not limited to compensation in full for '
any delays;acceleration,or loss of efficiency encountered by Contractor m the performance of the Work through the date of this Change Order,and for the performance
of this and any prior Change Orders by or before the date of Substantial Completion: In consideration of the compensation and time;if any,in this Change Order,the
Contractor hereby releases the City from all Claims;demands;or causes of action arising out of the transactions;events and occurrences giving rise to this Change
Order. This written Change Order is the entire agreement between the City and Contractor with respect to this Change Order. No other agreements or modifications
shall apply to this contract amendment unless expressly provided herein.
EXCEPT AS EXPRESSLY-MODIFIED HEREIN,THE TERMS AND CONDITIONS OF THE CONTRACT DOCUMENTS REMAIN UNCHANGED.
Page�1 of2
Approved by RPR/CEI: Approved by CIP Capital o•ect Coordinator: Approved by.CIP Division Director:
• •k`'1
Date Jo a Rffdriguez Date z. Date
A••rove. ine: of r • Approv by.= apit• r!ct Coordinator: A roved b CIP Dir ctor:
X47. A‘ 7/ /f (7
4. //i� // Date S., >! Baglie Dae David Martinez,P.E Date
Approved by Contractor: • . Cit a • City Clerk:
Date Dan Gelber . • • • Date Raf el Grana o •Date
D/j//6Z fnP/I% web •
APPROVED AS TO
FORM & LANGUAGE
FOR EXECUTION
&
City Attorney2pe Date