Resolution 2019-30874 RESOLUTION NO., 2019-30874 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA,APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AMENDMENT NO. 10 TO THE PROFESSIONAL ARCHITECTURAL AND ENGINEERING (NE) SERVICES AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND WOLFBERG/ALVAREZ AND PARTNERS, INC., FOR ADDITIONAL ARCHITECTURAL PROFESSIONAL SERVICES FOR THE FLAMINGO PARK PROJECT, IN THE NOT-TO-EXCEED AMOUNT OF $35,216; WITH PREVIOUSLY APPROPRIATED FUNDING. WHEREAS, pursuant to Request for Qualifications (RFQ) No. 15-06/07, the Mayor and City Commission adopted Resolution No. 2007-26609 on September 05, 2007, approving and authorizing the Mayor and City Clerk to execute an Agreement with Wolfberg /Alvarez and Partners, Inc., for Professional Architecture and Engineering Services for the Flamingo Park Project (the Agreement); and WHEREAS, the Agreement provides for the architectural, engineering, master planning, landscape architecture and surveying, as necessary for the Project and includes the development of the Master Plan Concept; and the design, bidding and award services, and construction administration of the Tennis Center; and WHEREAS, the Agreement was executed for a not-to-exceed amount of $443,000; and WHEREAS, on July 14, 2010, the City Commission adopted Resolution No. 2010-27427, approving Amendment No.1 to the Agreement, in the amount of $77,720, for the provision of additional architectural and engineering services associated with revisions to the Master Plan and Tennis Center; and WHEREAS, Amendment No. 2 was executed by the City on March 20, 2012, in the amount of $1,528, for the provision of additional architectural and engineering services associated with the relocation of the FPL transformer to the south side of the Tennis Center and associated revisions to the electrical room; and WHEREAS, Amendment No. 3 was executed on October 2, 2012, in the amount of $2,902, for the provision of additional architectural and engineering services associated with the partial re-design of the Tennis Center building structure due to an unforeseen existing underground utility duct bank; and WHEREAS, Amendment No. 4 was executed on August 15, 2013, in the amount of $2,016, for the provision of additional architectural engineering services associated with the design of the structural support of the ornamental sphere to be installed in the landscape planter on the west side of the Tennis Center building; and WHEREAS, on January 15, 2014, the City Commission adopted Resolution No. 2014- 28449, approving Amendment No.5 in the amount of $403,261, for additional architectural and engineering services associated with the planning, bidding and construction phase services of the remaining Flamingo Park improvements,which consist of a community garden, baseball field renovation, historic lodge renovation, new park entrance, enhanced pedestrian/bike paths, new interactive water feature,teenage activity, lighting enhancement, signage, drainage, landscaping and irrigation; and WHEREAS, Amendment No. 6 was executed by the City on April 23, 2015, in the amount of$14,732, for the provision of additional architectural and engineering services associated with scope modifications to the Master Plan concept that include an outdoor fitness cluster, the replacement of the community garden with a butterfly garden, the relocation of the new restroom facility, and upgrades to all playing fields (sod, drainage and irrigation); and WHEREAS, Amendment No. 7 was executed by the City on July 14, 2015, in the amount of$15,090, for the provision of additional architectural and engineering services associated with professional design services to renovate the existing soccer field, including replacing existing sod with synthetic turf and site drainage in and around the field; and WHEREAS, on December 14, 2016, the City Commission adopted Resolution No. 2016- 29672, approving Amendment No. 8 in the amount of $231,269, for the provision of additional architectural and engineering services that include updated phases for construction completion, revised construction cost estimates; the design, bidding and construction administration of the renovation of the Robert C. Hass Handball Court Building, the Joe Rubin Handball Court Building and the eight(8)existing outdoor courts; and the renovation of the softball field with new lighting, new benches and dug out, and a synthetic turf playing field with associated site drainage; and WHEREAS, on September 12, 2018, the City Commission adopted Resolution No. 2018- 30478, approving Amendment No. 9 in the amount of $71,200, for the provision of additional architectural and engineering services that include revisions for the relocation of the existing IT Room (currently located inside the soon to be renovated Historic Lodge), Phase I plan revisions due to Hurricane Irma tree damages, baseball field guy wires relocation due to the unforeseen conflict with the renovation design of ADA ramps, preparation of construction documents for the softball field as a"stand-alone" project and preparation of a new specific purpose and topographic survey for Flamingo Park; and WHEREAS, the proposed Amendment No. 10 to the Agreement is for additional architectural and engineering services associated with\additional scope to the Flamingo Park Master Plan due to community request and direction of the Commission to revisit the Flamingo Park Master Plan, as it relates to tree retention and mitigation; and WHEREAS, Amendment No. 10 also includes extended construction administration services for the Flamingo Park Handball Courts Renovation Project; and WHEREAS, Wolberg/Alvarez and Partners submitted a proposal in the amount of $35,216, for provision of professional services associated with additional scope to the Master Plan concept as defined in Amendment No. 10 (Attachment A); and WHEREAS, additional services include providing an updated tree survey, updating the tree disposition plan, reviewing the arborist's report from Starwood properties, providing recommendations to the City to incorporate off-site trees into the landscape plans, revising the landscape and irrigation plans due to incorporation of larger canopy trees, and revising the civil, site and electrical drawings to reflect a new sidewalk geometry to incorporate an existing Melaleuca tree to the current design; and WHEREAS, these revisions are required due to the necessity to mitigate the community's concerns regarding additional embellishment to Flamingo Park due to the removal of the invasive trees specimens; and WHEREAS, Wolfberg/Alvarez will also be providing extended construction administration services for the Flamingo Park Handball Courts Renovation Project for added scope of work associated to the restoration of stucco and project phasing required to maintain part of the handball courts operational during construction, as requested by the community; and WHEREAS, the proposal from Wolfberg/Alvarez was reviewed, negotiated by staff, and found to be fair and reasonable; and WHEREAS, this Amendment No. 10 to the Agreement, in the not to exceed amount of $35,216, will revise the total contract amount to a not-to-exceed amount of$1,297,934. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby approve and authorize the Mayor and City Clerk to execute Amendment No. 10 to the Professional Services Agreement between the City of Miami Beach, Florida and Wolfberg Alvarez and Partners, Inc. for additional services associated with the Flamingo Park Project, in an amount not-to-exceed of$35,216, with previously appropriated funding. PASSED and ADOPTED this /7 day of Jy(y , 2019. AA*. - - — Dan Gelber, Mayor ATTEST: . . /37 <I`). L rl 1549 FORMAPPROVED AS TO &LANGUAGE Rafael E. Granado, City Clerk &FO EXECUTION X: l'i'4k)1)1 ' 1 1 + 1 B �h ti, City Attorney ate , INCORP, ' ORATED: . _� O o '''cH?6. Resolutions -C7 C MIAMI BEACH COMMISSION MEMORANDUM TO: Honorable Mayor and Members of the City Commission FROM: Jimmy L. Morales, City Manager DATE: July 17, 2019 SUBJECT:A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AMENDMENT NO. 10 TO THE PROFESSIONAL ARCHITECTURAL AND ENGINEERING (NE) SERVICES AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND WOLFBERG/ALVAREZ AND PARTNERS, INC., FOR ADDITIONAL ARCHITECTURAL AND ENGINEERING PROFESSIONAL SERVICES FOR THE FLAMINGO PARK PROJECT; IN THE NOT-TO-EXCEED AMOUNT OF $35,216; WITH PREVIOUSLYAPPROPRIATED FUNDING RECOMMENDATION The Administration recommends that the City Commission approve the resolution. ANALYSIS On September 5, 2007, pursuant to Request for Qualifications (RFQ) No. 15-06/07, the Mayor and City Commission adopted Resolution No. 2007-26609 approving and authorizing the Mayor and City Clerk to execute an Agreement with Wolfberg/Alvarez and Partners, Inc. (Consultant), for the Flamingo Park Project. The scope includes architectural, engineering, master planning, landscape architecture and surveying, as necessary for the Project, including development of the Master Plan Concept and the design, bidding and award services, and construction administration of the Tennis Center. Amendments No.'s 1 through 4 included additional architectural and engineering services associated with changes to the scope and the design of the Tennis Center Project in a total amount of$84,166. On January 15, 2014, the City Commission adopted Resolution No. 2014-28449, approving and authorizing the Mayor and City Clerk to execute Amendment No. 5 for a total amount of $403,261.. This Amendment provided for the planning, design, bidding and construction phase services of the remaining Park improvements. On April 23, 2015, Amendment No. 6 was approved by The City Manager for a total amount of $14,732. This amendment provided for scope modifications to the Master Plan concept that Page 247 of 1502 include an outdoor fitness cluster, the replacement of the community garden with a butterfly garden, the relocation of the new restroom facility and upgrades to all playing fields, inclusive of sod, drainage and irrigation. On July 14, 2015, Amendment No. 7 was approved by the City Manager for a total amount of $15,090 for additional design services associated with the renovation of the existing soccer field, including replacing existing sod with synthetic turf and site drainage in and around the field. On December 14, 2016, the City Commission adopted Resolution No. 2016-29672, approving Amendment No. 8 in the amount of $231,269, for the provision of additional architectural and engineering services that include updated phases for construction completion, revised construction cost estimates; the design, bidding and construction administration of the renovation of the Robert C. Hass Handball Court Building, the Joe Rubin Handball Court Building, the eight (8) existing outdoor courts and the renovation of the softball field with new lighting, new benches, dug out, and a synthetic turf playing field with associated site drainage. On September 12, 2018, the City Commission adopted Resolution No. 2018-30478, approving Amendment No. 9 in the amount of $71,200, for the provision of additional architectural and engineering services that include revisions for the relocation of the existing IT Room (currently located inside the soon to be renovated Historic Lodge), Phase I plan revisions due to Hurricane Irma tree damages, relocation of baseball field guy wires due to the unforeseen conflict with the renovation of ADA ramps, preparation of construction documents for the softball field as a "stand-alone" project and preparation of a new specific purpose and topographic survey for Flamingo Park. Due to community request and direction of the Commission to revisit the Flamingo Park Master Plan with regards to tree retention and mitigation, and extended construction administration for the Handball Courts Renovation project, the City requested a proposal from Wolberg/Alvarez and Partners for professional services associated with additional scope to the Master Plan concept as defined in Amendment No. 10 (Exhibit A). The Consultant will be providing additional architectural and engineering services for the improvements of the Flamingo Park Master Plan to include an updated tree survey, updated tree disposition plan, review of arborist's report from Starwood properties, make recommendations to incorporate off-site trees into the landscape plans, revise the landscape and irrigation plans due to incorporation of larger canopy trees, revise civil, site and electrical drawings to reflect a new sidewalk geometry and incorporate an existing Melaleuca tree to the current design. These modifications are being performed to mitigate the community's concerns regarding the removal of the invasive trees species that were found to be in poor health. The Consultant will also be providing extended construction administration services for the Flamingo Park Handball Courts Renovation project for added project phasing which was required to maintain part of the handball courts operational during construction, as requested by the community and additional construction administration services for the restoration of the stucco which was found to be in poor condition during the renovation process. Wolfberg/Alvarez and Partners presented the City with a fee proposal for the additional professional services. Staff negotiated and reached an agreement in the not-to-exceed amount of $35,216. The negotiated fee is commensurate with the level of work contemplated in the Page 248 of 1502 scope of services for this project. The total revised contract amount is $1,297,934. CONCLUSION The Administration recommends that the City Commission approve the resolution. Amount 1 $35,216.00 Account 1 304-0820-069357-26-410-546-00-00-00- 23200 Total $35,216.00 Legislative Tracking Office of Capital Improvements ATTACHMENTS: Description ❑ Exhibit A-Amendment 10 ❑ Resolution Page 249 of 1502 AMENDMENT NO. 10 TO THE PROFESSIONAL ARCHITECTURAL AND ENGINEERING (A/E) SERVICES AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND WOLFBERG/ALVAREZ AND PARTNERS, INC. DATED MARCH 27TH, 2008, FOR THE PROVISION OF ADDITIONAL PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FORTHE FLAMINGO PARK PROJECT IN THE AMOUNT OF $35,216 This Amendment No. 10 to the Agreement made and entered this _ day of , 2019, by and between the CITY OF MIAMI BEACH, a municipal corporation existing under the laws of the State of Florida (hereinafter referred to as City), having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 33139, and WOLFBERG/ALVAREZ AND PARTNERS, INC., a Florida corporation, having its offices at 75 Valencia Avenue, Suite 1050, Coral Gables, FL 33134 (hereinafter referred to as Consultant). RECITALS WHEREAS, pursuant to Request for Qualifications (RFQ) No. 15-06/07, the Mayor and City Commission adopted Resolution No. 2007-26609 on September 05, 2007, approving and authorizing the Mayor and City Clerk to execute an Agreement with Wolfberg / Alvarez and Partners, Inc., for Professional Architecture and Engineering Services for the Flamingo Park Project (the Agreement); and WHEREAS, the Agreement provides for the architectural, engineering, master planning, landscape architecture and surveying, as necessary for the Project and includes the development of the Master Plan Concept; and the design, bidding and award services, and construction administration of the Tennis Center; and WHEREAS, the Agreement was executed for a not-to-exceed amount of $443,000; and WHEREAS, on July 14, 2010, the City Commission adopted Resolution No. 2010- 27427, approving Amendment No.1 to the Agreement, in the amount of $77,720, for the provision of additional architectural and engineering services associated with revisions to the Master Plan and Tennis Center; and WHEREAS, Amendment No. 2 was executed by the City on March 20, 2012, in the amount of $1,528, for the provision of additional architectural and engineering services associated with the relocation of the FPL transformer to the south side of the Tennis Center and associated revisions to the electrical room; and WHEREAS, Amendment No. 3 was executed on October 2, 2012, in the amount of Page 1 of 7 Wolfberg/Alvarez and Partners,Inc.,Amendment No.10 Page 250 of 1502 $2,902, for the provision of additional architectural and engineering services associated with the partial re-design of the Tennis Center building structure due to an unforeseen existing underground utility duct bank; and WHEREAS, Amendment No. 4 was executed on August 15, 2013, in the amount of $2,016, for the provision of additional architectural engineering services associated with the design of the structural support of the ornamental sphere to be installed in the landscape planter on the west side of the Tennis Center building; and WHEREAS, on January 15, 2014, the City Commission adopted Resolution No. 2014- 28449, approving Amendment No.5 in the amount of$403,261, for additional architectural and engineering services associated with the planning, bidding and construction phase services of the remaining Park improvements, which consist of a community garden, baseball field renovation, historic lodge renovation, new park entrance, enhanced pedestrian/bike paths, new interactive water feature, teenage activity, lighting enhancement, signage, drainage, landscaping and irrigation; and WHEREAS, Amendment No. 6 was executed by the City on April 23, 2015, in the amount of $14,732, for the provision of additional architectural and engineering services associated with scope modifications to the Master Plan concept that include an outdoor fitness cluster, the replacement of the community garden with a butterfly garden, the relocation of the new restroom facility, and upgrades to all playing fields (sod, drainage and irrigation); and WHEREAS, Amendment No. 7 was executed by the City on July 14, 2015, in the amount of $15,090, for the provision of additional architectural and engineering services associated with professional design services to renovate the existing soccer field, including replacing existing sod with synthetic turf and site drainage in and around the field; and WHEREAS, on December 14, 2016, the City Commission adopted Resolution No. 2016-29672, approving Amendment No. 8 in the amount of $231,269, for the provision of additional architectural and engineering services that include updated phases for construction completion, revised construction cost estimates; the design, bidding and construction administration of the renovation of the Robert C. Hass Handball Court Building, the Joe Rubin Handball Court Building and the eight (8) existing outdoor courts; and the renovation of the softball field with new lighting, new benches and dug out, and a synthetic turf playing field with associated site drainage; and WHEREAS, On September 12, 2018, the City Commission adopted Resolution No. 2018-30478, approving Amendment No. 9 in the amount of $71,200, for the provision of additional architectural and engineering services that include revisions for the relocation of the existing IT Room (currently located inside the soon to be renovated Historic Lodge), Phase I plan revisions due to Hurricane Irma tree damages, baseball field guy wires relocation due to the unforeseen conflict with the renovation design of ADA ramps, preparation of construction documents for the softball field as a "stand-alone" project and preparation of a new specific purpose and topographic survey for Flamingo Park; and WHEREAS, Amendment No. 10 to the Agreement is for additional architectural and engineering services associated with additional scope to the Flamingo Park Master Plan due to community request and direction of the Commission to revisit the Flamingo Park Master Plan Page 2 of 7 Wolfberg/Alvarez and Partners,Inc.,Amendment No.10 Page 251 of 1502 with regards to tree retention and mitigation; and WHEREAS, Amendment No. 10 also includes extended construction administration services for the Flamingo Park Handball Courts Renovation project; and WHEREAS, Wolberg/Alvarez and Partners submitted a proposal in the amount of $35,216 for provision of professional services associated with additional scope to the Master Plan concept as defined in Amendment No. 10 (Attachment A); and WHEREAS, additional services include, an updated tree survey, updated tree disposition plan, review of arborist's report from Starwood properties, recommendations to incorporate off-site trees into the landscape plans, revise the landscape and irrigation plans due to incorporation of larger canopy trees, revisions to civil, site and electrical drawings to reflect a new sidewalk geometry to incorporate an existing Melaleuca tree to the current design; and WHEREAS, these revisions are required due to the necessity to mitigate the community's concerns regarding additional embellishment to the park due to the removal of the invasive trees specimens; and WHEREAS, the Consultant will also be providing extended construction administration services for the Flamingo Park Handball Courts Renovation project for added scope of work associated to the restoration of stucco and project phasing required to maintain part of the handball courts operational during construction, as requested by the community; and WHEREAS, the proposal from Consultant was reviewed, negotiated by staff and found to be fair and reasonable; and WHEREAS, this Amendment No. 10 to the Agreement, in the not to exceed amount of $35,216, will revise the total contract amount to a not-to-exceed total of$1,297,934. NOW, THEREFORE, the parties hereto, and in consideration of the mutual promises, covenants, agreements, terms, and conditions herein contained, and other good and valuable consideration, the respect and adequacy are hereby acknowledged, do agree as follows: 1. ABOVE RECITALS The above recitals are true and correct and are incorporated as a part of this Amendment No. 10. 2. MODIFICATIONS The Agreement is amended as defined in Schedule "A-10", attached herein. 3. OTHER PROVISIONS. All other provisions of the Agreement, as amended, are unchanged. 4. RATIFICATION. The City and Consultant ratify the terms of the Agreement, as amended by this Amendment No. 10. Page 3 of 7 Wolfberg/Alvarez and Partners,Inc.,Amendment No.10 Page 252 of 1502 IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 10 to be executed in their names by their duly authorized officials as of the date first set forth above. ATTEST: CITY OF MIAMI BEACH, FLORIDA Rafael E. Granado, City Clerk Dan Gelber, Mayor ATTEST: CONSULTANT: WOLFBERG/ALVAREZ AND PARTNERS, INC. Rafael Labrada Julio E. Alvarez, President Page 4 of 7 Wolfberg/Alvarez and Partners,Inc.,Amendment No.10 Page 253 of 1502 SCHEDULE "A" SCOPE OF SERVICES Schedule "A" entitled, "Scope of Services", is amended as follows: Add the following under Task 5—ADDITIONAL SERVICES Task 5.8 -Additional Design Services: The scope of services included herein is as follows: • Provide an updated tree survey ■ Update the tree disposition plan ■ Review Arborist's report from Starwood properties • Make recommendations to incorporate off-site trees into the landscape plans • Revise the landscape and irrigation plans • Revise civil, site and electrical drawings to reflect a new sidewalk geometry • Incorporate an existing Melaleuca tree to the current design • Construction administration services for added project phasing for the Handball Courts Renovation • Construction administration services for the restoration of the stucco Please refer to the attached spreadsheet for breakdown of anticipated effort. WA proposes to perform the above-noted services for a not-to-exceed fee of$35,216.00. PAYMENT AND COMPENSATION The total fee proposed for this Scope of Work is a not-to-exceed amount of$35,216.00 (refer to Exhibit A-10 attached herein). - Original Agreement amount$443,000. - Amendment No. 1: For the provision of additional architectural and engineering services associated with revisions to the master plan and tennis center in the amount of$77,720. • Amendment No. 2: For the provision of additional architectural and engineering services associated with the Tennis Center and the relocation of the proposed FPL transformer and associated revisions to the electrical room in the amount of $1,528. - Amendment No. 3: For the partial re-design of the Tennis Center building structure due to an unforeseen existing underground utility duct bank in the amount of$2,902. • Amendment No. 4: For additional architectural and engineering services associated with the design of the structural support of the ornamental sphere to be installed in the landscape planter on the west side of the Tennis Center Page 5 of 7 Wolfberg/Alvarez and Partners,Inc.,Amendment No.10 Page 254 of 1502 building in the amount of$2,016. • Amendment No. 5: For additional architectural and engineering services associated with the planning and design of the remaining park wide improvements, which include a community garden, baseball field renovation, historic lodge renovation, new park entrance, enhanced pedestrian/bike paths, new interactive water feature, lighting enhancement, signage, drainage, landscaping and irrigation, in the amount of$403,261. - Amendment No. 6: For additional architectural and engineering services associated with additional revisions to the Master Plan, in the amount of $14,732. • Amendment No. 7: For additional architectural and engineering services associated with the design renovation of the existing soccer field, including replacing existing sod with synthetic turf and site drainage in and around the field, in the amount of$15,090. - Amendment No. 8: For additional architectural and engineering services that include updated phases for construction completion, revised construction cost estimates; the design, bidding and construction administration of the renovation of the Robert C. Hass Handball Court Building, the Joe Rubin Handball Court Building and the eight (8) existing outdoor courts; and the renovation of the softball field with new lighting, new benches and dug- out, and a synthetic turf playing field with associated site drainage, in the amount of$231,269. - Amendment No. 9: For additional architectural and engineering services associated with additional scope to the Master Plan concept which includes revisions for the relocation of the existing IT Room (currently located inside the soon to be renovated Historic Lodge), Phase I plan revisions due to Hurricane Irma tree damages, baseball field guy wires relocation due to the unforeseen conflict with the renovation design of ADA ramps, preparation of construction documents for the softball field as a "stand-alone" project and preparation of a new specific purpose and topographic survey for Flamingo Park, in the amount of$71,200 Amendment No. 10 to the Agreement is for additional architectural and engineering services associated with additional scope to the Flamingo Park Master Plan concept which incorporates additional architectural and engineering services for the improvements of the Flamingo Park Phase I project to include additional services to provide an updated tree survey, updated tree disposition plan, review of Arborist's report from Starwood properties, make recommendations to incorporate off-site trees into the landscape plans, revise the landscape and irrigation plans due to incorporation of larger canopy trees. Revise civil, site and electrical drawings to reflect a new sidewalk geometry and incorporate an existing Melaleuca tree to the current design. All these due to the necessity to mitigate the community's concerns regarding additional embellishment to the park due to the removal of the invasive species trees. The Consultant will also be providing additional professional services for the Handball Courts Renovation project to include additional construction administration services for added project phasing which was required for maintaining part of the Page 6 of 7 Wolfberg/Alvarez and Partners,Inc.,Amendment No.10 Page 255 of 1502 handball courts operational during construction. Additional construction administration services for the restoration of the stucco which was found to be in poor condition during the renovation process all in the amount of$35,216. • Revised Agreement amount$1,297,934. Page 7 of 7 Wolfberg/Alvarez and Partners,Inc.,Amendment No.10 Page 256 of 1502 Marcel R.Morlote,President Y Ms Garcia,Vice President Raul J.Estevez,Vice President Katrina L.Alvarez-Ruiz,Director David AY ..Alvarez, rg,Founder(1947-2015) WOLFBERG ALVAREZ&PARTNERS Julio E.AlvarFounder(1947-2017) 75 VALENICA AVE.,SUITE 1050,CORAL GABLES,FL 33134 PH.305-666-5474 May 21, 2019 via Email: SabrinaBaglieri@miamibeachfl.gov Revised July 9, 2019 Ms. Sabrina Baglieri Senior Capital Projects Coordinator City of Miami Beach Office of Capital Improvement Projects 1701 Meridian Avenue, Suite 300 Miami Beach, FL 33139 RE: Flamingo Park WA Project No.: 2801000 Subj: Proposal for Additional Services for Modifications to the Landscaping Design and Related Walkway Configuration Dear Ms. Baglieri: Pursuant to the recent request by the City,following is our proposal for the above-noted additional services for the Flamingo Park project. LANDSCAPING AND IRRIGATION DESIGN REVISIONS Revise the landscaping and irrigation design for the Phase 1 scope, as reflected in the attached proposal from O'Leary Richards Design Associates, Inc., dated May 7, 2019 and the attached sketch. Provide the services noted in their proposal. WOLFBERG ALVAREZ—REVISED CIVIL AND ELECTRICAL Revise the Civil drawings for the Phase 1 scope,to reflect the new sidewalk geometry. Revise the pedestrian lighting as required to accommodate the revised sidewalk geometry. Prepare photometrics. DELIVERABLE SCHEDULE Six(6)weeks from Approval-N.T.P. P:IFlamingo Park Master PIan.20151Project Management\Proposals107-09-19(Sabrina Baglieri)Additional Services Proposal re.Landsc Design Mods&Related Walkway.docx WOLFBERGALVAREZ.COM ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN AA0002416 E6tJ002354 Page 257 of 1502 Ms. Sabrina Baglieri July 9,2019 Flamingo Park Page 2 of 2 WA Project No. 2801000 WOLFBERG ALVAREZ—ADDITIONAL CONSTRUCTION ADMINISTRATION SERVICES Provide extended C.A. services for the Handball Courts Renovation scope per the Contractor's claim of additional 150 calendar days to their Contract. The 150 days, as indicated by the contractor are 90 days for phasing of the work and 60 days for the additional stucco work. WA proposes to provide the above-noted services for a not-to-exceed fee of$35,216.00. Please see attached proposal from O'Leary Richards Schedule B, dated May 21,2019. I trust this proposal satisfies your request. Should it be necessary,please feel free to contact us. Sincerely, • Jorge G. Maldonado, P.E. Project Manager Attachments P:\Flamingo Park Master PIan.20151Project Management\Proposals107-09-19(Sabrina Baglieri)Additional Services Proposal re.Landsc Design Mods 8 Related Walkway.docx WOLFBERGALVAREZ.COM ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN AA0002 16 E50002354 Page 258 of 1502 WOLFBERG ALVAREZ AND PARTNERS SCHEDULE B July 9,2019 CITY OF MIAMI BEACH FLAMINGO PARK CONSULTANT'S COMPENSATION FEE SCHEDULE TASK NO. TASK DESCRIPTION PROJECT PROJECT SR.ENG./ ENGINEER I DIRECTOR MANAGER ARCHITECT ARCHITECT DRAFTER CLERICAL TOTAL HOURS TOTAL COST TOTALS PER PHASE • Modifications to Landscaping Design and Related Walkway Configuration DESIGN SERVICES $3,224.00 Protect Management 0 2 0 0 0 0 2 $296.00 Civil 0 0 8 0 8 0 18 $1,528.00 Architecture 0 0 0 0 0 D 0 $0.00 Structure 0 0 0 0 0 0 0• $0.00 Plumbing 0 0 0 0 0 0 0 $0.00 Fire Protection 0 0 0 0 0 0 0 $0.00 Mechanical 0 0 0 0 0 0 0 $0.00 Electrical 0 0 8 0 6 0 14 $1,400.00 Landscaping-O'Leary Richards $16,600.00 CONSTRUCTION ADMINISTRATION SERVICES $15,392.00 Construction Administration Services 0 104 0 0 0 0 104 $15,392.00 0 106 160 14 0 136 $178.50 $148.00 $127.00 $107.00 $64.00 $49.20 GRAND TOTAL $35,216.00 • Page 259 of 1502 O'Leary Richards Design May 7,2019 Associates, Inc. Mr. Marcel Morlote,AIA Landscape Architecture&Planning Sr.Vice President Wolfberg Alvarez&Partners 75 Valencia Avenue,Suite 1050 Coral Gables,FL 33134 Re: Landscape Architectural Services for: Flamingo Park Ph. 1-Additional Services 1200 Meridian Avenue Miami Beach,Florida 33139 Dear Marcel: Pursuant to your request, O'Leary Richards Design Associates, Inc. proposes to provide additional landscape architectural services for the above referenced project. The basic professional services to be included are as follows: A) On-site meeting with City staff to review existing tree removals, disposition of existing trees and modifications to plans. B) Site visit to update Tree Survey per City Urban Forester request prior to arborist visit. C) Phone conferences and emails to coordinate existing tree removals with City, WA and Arborist. D) Update Phase Tree Disposition Lists based on Arborist report. E) Review Arborist report from Starwood properties and make recommendation. Incorporate off-site tree into Landscape Plan. F) Revise Tree Disposition Plans per City direction(Sheets L0.3, L0.4, L0.5). G) Revise Landscape Plans per City direction(Sheets L1.1,L1.1, L1.3,L2.1). H) Revise Irrigations Plans to reflect modifications to the Site Plan and Landscape Plan (Sheets IR1.1,IR1.2, IR1.3,IR2.1). I) Re-evaluate existing trees on site and up-date Tree Resource Evaluation Report prepared by certified arborist. Our Lump Sum Fee for items A through J above will be Sixteen Thousand Six-Hundred Dollars and 00/100 ($16,600.00). The work shall be performed in accordance with the terms and conditions of the basic services agreement between O'Leary Richards Design Associates, Inc.and Wolfberg Alvarez&Partners,Inc.dated September 12,2016. If the proposed work and fees contained herein are agreeable with you, please sign the enclosed copy of this letter and return same to our office. Should you have any questions regarding the above,please do not hesitate to call. Very truly yours, Kathryn O'Leary Richards,ASLA Accepted: Oak Plaza Professional Center 8525 SW 92nd Street,Suite C-11 Miami,Florida 33156 By: Date: Phone:305.596.6628 Mr. Marcel Morlote,AIA,President Fax:305.596.9160 Wolfberg Alvarez&Partners LC#26000195 Member of the Page 260 of 1502 American Society of Landscape Architects O'LEARY RICHARDS DESIGN ASSOC., INC. SCHEDULE B June 24, 2019 CITY OF MIAMI BEACH FLAMINGO PARK-PHASE 1 SUB-CONSULTANT'S COMPENSATION FEE SCHEDULE TASK TASK DESCRIPTION PROJECT PROJECT LANDSCAPE TOTAL HOURS TOTAL COST TOTALS PER PHASE NO. DIRECTOR MANAGER ARCHITECT Modifications to Landscaping Design and Related Walkway Configuration DESIGN SERVICES $16,601.00 Landscape Architecture-O'Leary Richards 46 35 30 111 $16,601.00 CONSTRUCTION ADMINISTRATION SERVICES Construction Administration Services 0 0 0 0 $0.00 46 35 30 111 $178.50 $148.00 $107.00 GRAND TOTAL $16,601.00 Page 261 of 1502 09£# ' ', NI 0I� �1,-os l d°L9a a >c fr9E• \► L9�# 4/$11'. •' f 59 # '., No,S r : ' (JS OZC) 1SIx3 45144 liad• N!i} . Ise°S 0 v•. `` R . • • z---i30N3� 1lNI7 Nld (}s 09ti(.) �Q : 00 miaimmavimmmui • OO: � . • M (Z) SIX' ,�lIM ter... '.: •�. :.. .' •.•''� � . .. .. • 'a .Y: . �• �.' .. . . e • '�� GS 091.) ,• �1W2�JIS pasOdO.l,d uS•098� ,, (4S.5L1) r. • #SOS P°S Iair 4.OS 9 #.01.... - 414°ItP• 1414 , • • • Oc 941"1 1 i .7/7v41 046 i'ivgq • , • t EL4I Iffrrt 'OIC - ( . .. . .. -x- , . . • • . • . . . , 144,9,4 vital 1;4/.4%14- - - -x(#57701\ ,�h� mss:• . , . . . , LIMIT OF LANDSCAPE ryG — - WORK PHASE 1 — — ' —x 1` ° #571/ ria /: _�/ �� _ �Fi. ,, :. , ACII Q _� ,I0 l #575 , ° 7. ..,, ,i o -- `+ 1 �� . . . ° BILLBOARD SCORE ° #585 _ 1__ #584 _' + _ iii_ .- #579/ �� � '. - sod I / ��/ \ Sod 1,520 i • • (5.010 80 O Q �f ® ® IST (6). ', \ \ *I3 • 99��u • PROPOSED BENCH \ 290 1 ° 1 I ` ° Q ® I • LOCATION(TYP) V KLIMU) QUVI • IT OF LANDSCAPE . . - . EXIST i ° 1 //11)) ORK-PHASE 1 4 • R �V• (� E � 7 • P01'4cr)BENCH -� QuVi Ca �„•? li DOG PARK \` / l l� .',.. ........./ • ,+ . w EXIST. 1 d1�A 'HYDRANT ( \ I (> V E� 1 1 CM, - shi � SS i . BENCH `` / I ', yP) I / , / , LIMIT OF LANDSCAPE I, -'1 x—x—x—x-CP-4—x—x—x—x—x—x—x—x—x—x—x—x—x-I ` #J91 ` #592 WORK-PHASE 1 Q x I ` EXIST FAIN LINK FENCE I{ . /ST. wV� (1�g Osf) • 3}. 21 Page 263 of 1502