Amendment No. 10 to the PSA with Wolfberg/Alvarez and Partners, Inc. a.ol q- 30Se7 (1
AMENDMENT NO. 10
TO THE PROFESSIONAL ARCHITECTURAL
AND
ENGINEERING (NE) SERVICES AGREEMENT
BETWEEN THE CITY OF MIAMI BEACH, FLORIDA
AND
WOLFBERG/ALVAREZ AND PARTNERS, INC.
DATED MARCH 27TH, 2008,
FOR THE PROVISION OF ADDITIONAL PROFESSIONAL ARCHITECTURAL AND
ENGINEERING SERVICES FOR THE FLAMINGO PARK PROJECT IN THE AMOUNT
OF $35,216
This Amendment No. 10 to the Agreement made and entered this ay of Av6, 2019,
by and between the CITY OF MIAMI BEACH, a municipal corporation existing under the
laws of the State of Florida (hereinafter referred to as City), having its principal offices at
1700 Convention Center Drive, Miami Beach, Florida 33139, and WOLFBERG/ALVAREZ
AND PARTNERS, INC., a Florida corporation, having its offices at 75 Valencia Avenue, Suite
1050, Coral Gables, FL 33134 (hereinafter referred to as Consultant).
RECITALS
WHEREAS, pursuant to Request for Qualifications (RFQ) No. 15-06/07, the Mayor
and City Commission adopted Resolution No. 2007-26609 on September 05, 2007,
approving and authorizing the Mayor and City Clerk to execute an Agreement with
Wolfberg / Alvarez and Partners, Inc., for Professional Architecture and Engineering
Services for the Flamingo Park Project (the Agreement); and
WHEREAS, the Agreement provides for the architectural, engineering, master
planning, landscape architecture and surveying, as necessary for the Project and includes
the development of the Master Plan Concept; and the design, bidding and award services,
and construction administration of the Tennis Center; and
WHEREAS, the Agreement was executed for a not-to-exceed amount of
$443,000; and
WHEREAS, on July 14, 2010, the City Commission adopted Resolution No. 2010-
27427, approving Amendment No.1 to the Agreement, in the amount of $77,720, for the
provision of additional architectural and engineering services associated with revisions to the
Master Plan and Tennis Center; and
WHEREAS, Amendment No. 2 was executed by the City on March 20, 2012, in the
amount of $1,528, for the provision of additional architectural and engineering services
associated with the relocation of the FPL transformer to the south side of the Tennis Center
and associated revisions to the electrical room; and
WHEREAS, Amendment No. 3 was executed on October 2, 2012, in the amount of
Page 1 of 7
Wolfberg/Alvarez and Partners,Inc.,Amendment No.10
$2,902, for the provision of additional architectural and engineering services associated with
the partial re-design of the Tennis Center building structure due to an unforeseen existing
underground utility duct bank; and
WHEREAS, Amendment No. 4 was executed on August 15, 2013, in the amount of
$2,016, for the provision of additional architectural engineering services associated with the
design of the structural support of the ornamental sphere to be installed in the landscape
planter on the west side of the Tennis Center building; and
WHEREAS, on January 15, 2014, the City Commission adopted Resolution No. 2014-
28449, approving Amendment No.5 in the amount of$403,261, for additional architectural and
engineering services associated with the planning, bidding and construction phase services of
the remaining Park improvements, which consist of a community garden, baseball field
renovation, historic lodge renovation, new park entrance, enhanced pedestrian/bike paths, new
interactive water feature, teenage activity, lighting enhancement, signage, drainage,
landscaping and irrigation; and
WHEREAS, Amendment No. 6 was executed by the City on April 23, 2015, in the
amount of $14,732, for the provision of additional architectural and engineering services
associated with scope modifications to the Master Plan concept that include an outdoor fitness
cluster, the replacement of the community garden with a butterfly garden, the relocation of the
new restroom facility, and upgrades to all playing fields(sod, drainage and irrigation); and
WHEREAS, Amendment No. 7 was executed by the City on July 14, 2015, in the
amount of $15,090, for the provision of additional architectural and engineering services
associated with professional design services to renovate the existing soccer field, including
replacing existing sod with synthetic turf and site drainage in and around the field; and
WHEREAS, on December 14, 2016, the City Commission adopted Resolution No.
2016-29672, approving Amendment No. 8 in the amount of $231,269, for the provision of
additional architectural and engineering services that include updated phases for construction
completion, revised construction cost estimates; the design, bidding and construction
administration of the renovation of the Robert C. Hass Handball Court Building, the Joe Rubin
Handball Court Building and the eight (8) existing outdoor courts; and the renovation of the
softball field with new lighting, new benches and dug out, and a synthetic turf playing field with
associated site drainage; and
WHEREAS, On September 12, 2018, the City Commission adopted Resolution No.
2018-30478, approving Amendment No. 9 in the amount of $71,200, for the provision of
additional architectural and engineering services that include revisions for the relocation of the
existing IT Room (currently located inside the soon to be renovated Historic Lodge), Phase I
plan revisions due to Hurricane Irma tree damages, baseball field guy wires relocation due to
the unforeseen conflict with the renovation design of ADA ramps, preparation of construction
documents for the softball field as a "stand-alone" project and preparation of a new specific
purpose and topographic survey for Flamingo Park; and
WHEREAS, Amendment No. 10 to the Agreement is for additional architectural and
engineering services associated with additional scope to the Flamingo Park Master Plan due to
community request and direction of the Commission to revisit the Flamingo Park Master Plan
Page 2 of 7
Wolfberg/Alvarez and Partners,Inc.,Amendment No.10
with regards to tree retention and mitigation; and
WHEREAS, Amendment No. 10 also includes extended construction administration
services for the Flamingo Park Handball Courts Renovation project; and
WHEREAS, Wolberg/Alvarez and Partners submitted a proposal in the amount of
$35,216 for provision of professional services associated with additional scope to the Master
Plan concept as defined in Amendment No. 10 (Attachment A); and
WHEREAS, additional services include, an updated tree survey, updated tree
disposition plan, review of arborist's report from Starwood properties, recommendations to
incorporate off-site trees into the landscape plans, revise the landscape and irrigation plans
due to incorporation of larger canopy trees, revisions to civil, site and electrical drawings to
reflect a new sidewalk geometry to incorporate an existing Melaleuca tree to the current
design; and
WHEREAS, these revisions are required due to the necessity to mitigate the
community's concerns regarding additional embellishment to the park due to the removal of the
invasive trees specimens; and
WHEREAS, the Consultant will also be providing extended construction administration
services for the Flamingo Park Handball Courts Renovation project for added scope of work
associated to the restoration of stucco and project phasing required to maintain part of the
handball courts operational during construction, as requested by the community; and
WHEREAS, the proposal from Consultant was reviewed, negotiated by staff and found
to be fair and reasonable; and
WHEREAS, this Amendment No. 10 to the Agreement, in the not to exceed amount of
$35,216, will revise the total contract amount to a not-to-exceed total of$1,297,934.
NOW, THEREFORE, the parties hereto, and in consideration of the mutual promises,
covenants, agreements, terms, and conditions herein contained, and other good and valuable
consideration, the respect and adequacy are hereby acknowledged, do agree as follows:
1. ABOVE RECITALS
The above recitals are true and correct and are incorporated as a part of this
Amendment No. 10.
2. MODIFICATIONS
The Agreement is amended as defined in Schedule "A-10", attached herein.
3. OTHER PROVISIONS.
All other provisions of the Agreement, as amended, are unchanged.
4. RATIFICATION.
The City and Consultant ratify the terms of the Agreement, as amended by this
Amendment No. 10.
Page 3 of 7
Wolfberg/Alvarez and Partners,Inc.,Amendment No.10
IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 10 to be
executed in their names by their duly authorized officials as of the date first set forth
above.
ATTEST: CITY OF MIAMI BEACH, FLORIDA
A Ark“.
Rafael E. Granado, City Clerk pan Gelber, Mayor
ATTEST: CONSULTANT:
WOLFBERG /ALVAREZ AND PARTNERS, INC.
cL,Ai)
040 Ili
r
Rafael -abrada Ju.. E CS, Presi ent
W Lmog►-rge
APPROVED AS TO
m1 • FORM &LANGUAGE
• c\At3-'1111, &FOR EXECUTION
�
''
II�rcORP g City Attorney RN)Q Date
ORATED: " 0
Page 4 of 7
Wolfberg/Alvarez and Partners,Inc.,Amendment No.10
SCHEDULE "A"
SCOPE OF SERVICES
Schedule "A" entitled, "Scope of Services", is amended as follows:
Add the following under Task 5—ADDITIONAL SERVICES
Task 5.8 -Additional Design Services:
The scope of services included herein is as follows:
• Provide an updated tree survey
• Update the tree disposition plan
• Review Arborist's report from Starwood properties
• Make recommendations to incorporate off-site trees into the landscape plans
• Revise the landscape and irrigation plans
• Revise civil, site and electrical drawings to reflect a new sidewalk geometry
• Incorporate an existing Melaleuca tree to the current design
• Construction administration services for added project phasing for the Handball Courts
Renovation
• Construction administration services for the restoration of the stucco
Please refer to the attached spreadsheet for breakdown of anticipated effort. WA proposes to
perform the above-noted services for a not-to-exceed fee of$35,216.00.
PAYMENT AND COMPENSATION
The total fee proposed for this Scope of Work is a not-to-exceed amount of$35,216.00 (refer
to Exhibit A-10 attached herein).
• Original Agreement amount$443,000.
• Amendment No. 1: For the provision of additional architectural and engineering
services associated with revisions to the master plan and tennis center in the
amount of$77,720.
• Amendment No. 2: For the provision of additional architectural and engineering
services associated with the Tennis Center and the relocation of the proposed
FPL transformer and associated revisions to the electrical room in the amount of
$1,528.
• Amendment No. 3: For the partial re-design of the Tennis Center building
structure due to an unforeseen existing underground utility duct bank in the
amount of$2,902.
- Amendment No. 4: For additional architectural and engineering services
associated with the design of the structural support of the ornamental sphere to
be installed in the landscape planter on the west side of the Tennis Center
Page 5 of 7
Wolfberg/Alvarez and Partners,Inc.,Amendment No.10
building in the amount of$2,016.
• Amendment No. 5: For additional architectural and engineering services
associated with the planning and design of the remaining park wide
improvements, which include a community garden, baseball field renovation,
historic lodge renovation, new park entrance, enhanced pedestrian/bike paths,
new interactive water feature, lighting enhancement, signage, drainage,
landscaping and irrigation, in the amount of$403,261.
• Amendment No. 6: For additional architectural and engineering services
associated with additional revisions to the Master Plan, in the amount of
$14,732.
- Amendment No. 7: For additional architectural and engineering services
associated with the design renovation of the existing soccer field, including
replacing existing sod with synthetic turf and site drainage in and around the
field, in the amount of$15,090.
- Amendment No. 8: For additional architectural and engineering services that
include updated phases for construction completion, revised construction cost
estimates; the design, bidding and construction administration of the renovation
of the Robert C. Hass Handball Court Building, the Joe Rubin Handball Court
Building and the eight (8) existing outdoor courts; and the renovation of the
softball field with new lighting, new benches and dug out, and a synthetic turf
playing field with associated site drainage, in the amount of$231,269.
• Amendment No. 9: For additional architectural and engineering services
associated with additional scope to the Master Plan concept which includes
revisions for the relocation of the existing IT Room (currently located inside the
soon to be renovated Historic Lodge), Phase I plan revisions due to Hurricane
Irma tree damages, baseball field guy wires relocation due to the unforeseen
conflict with the renovation design of ADA ramps, preparation of construction
documents for the softball field as a "stand-alone" project and preparation of a
new specific purpose and topographic survey for Flamingo Park, in the amount
of$71,200
Amendment No. 10 to the Agreement is for additional architectural and
engineering services associated with additional scope to the Flamingo Park
Master Plan concept which incorporates additional architectural and
engineering services for the improvements of the Flamingo Park Phase I project
to include additional services to provide an updated tree survey, updated tree
disposition plan, review of Arborist's report from Starwood properties, make
recommendations to incorporate off-site trees into the landscape plans, revise
the landscape and irrigation plans due to incorporation of larger canopy trees.
Revise civil, site and electrical drawings to reflect a new sidewalk geometry and
incorporate an existing Melaleuca tree to the current design. All these due to the
necessity to mitigate the community's concerns regarding additional
embellishment to the park due to the removal of the invasive species trees. The
Consultant will also be providing additional professional services for the Handball
Courts Renovation project to include additional construction administration
services for added project phasing which was required for maintaining part of the
Page 6 of 7
Wolfberg/Alvarez and Partners,Inc.,Amendment No.10
handball courts operational during construction. Additional construction
administration services for the restoration of the stucco which was found to be in
poor condition during the renovation process all in the amount of$35,216.
- Revised Agreement amount$1,297,934.
•
•
Page 7 of 7
Wolfberg/Alvarez and Partners,Inc.,Amendment No.10
Marcel R Modofe,Preardent
AMa JGarcia,Vice President
Raul J Estevez,Vice President
Katrina L,Alvarez-Ruiz Director
David A Woltberg,Founder 11937-2015)
WOLFBERG ALVAREZ&PARTNERS Julio E Alvarez,Founder 11937.2017)
75 VALENICA AVE.,SUITE 1050,CORAL GABLES,FL 33134 PH.305-666-5474
•
May 21, 2019 via Email: SabrinaBaglieri@miamibeachfl.gov
Revised July 9, 2019
Ms. Sabrina Baglieri
Senior Capital Projects Coordinator
City of Miami Beach
Office of Capital Improvement Projects
1701 Meridian Avenue, Suite 300
Miami Beach, FL 33139
RE: Flamingo Park
WA Project No.: 2801000
Subj: Proposal for Additional Services for Modifications to the Landscaping Design
and Related Walkway Configuration
Dear Ms. Baglieri:
Pursuant to the recent request by the City,following is our proposal for the above-noted additional services
for the Flamingo Park project.
LANDSCAPING AND IRRIGATION DESIGN REVISIONS
Revise the landscaping and irrigation design for the Phase 1 scope, as reflected in the attached proposal
from O'Leary Richards Design Associates, Inc., dated May 7, 2019 and the attached sketch. Provide the
services noted in their proposal.
WOLFBERG ALVAREZ—REVISED CIVIL AND ELECTRICAL
Revise the Civil drawings for the Phase 1 scope, to reflect the new sidewalk geometry.
Revise the pedestrian lighting as required to accommodate the revised sidewalk geometry. Prepare
photometrics.
DELIVERABLE SCHEDULE
Six(6)weeks from Approval-N.T.P.
P 9ami-gaPerk Mash Pte:2015'_Prajtrx ":na.^:rer5'Propasais^-07Z,-1C(Sabrina E`ir r n'Adci50-ai 5a icesPropos:Ire.Land;c:^er n t,xis 8 Related W'aEGvay.docx
WOLFBERGALVAREZ.COM ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN
M0002516 E.8000233E4
Ms. Sabrina Baglieri July 9,2019
Flamingo Park Page 2 of 2
WA Project No. 2801000
WOLFBERG ALVAREZ—ADDITIONAL CONSTRUCTION ADMINISTRATION SERVICES
Provide extended,C.A. services for the Handball Courts Renovation scope per the Contractor's claim of
additional 150 calendar days to their Contract. The 150 days, as indicated by the contractor are 90 days for
phasing of the work and 60 days for the additional stucco work.
WA proposes to provide the above-noted services for a not-to-exceed fee of$35,216.00.
Please see attached proposal from O'Leary Richards Schedule B,dated May 21,2019. I trust this proposal
satisfies your request. Should it be necessary, please feel free to contact us.
Sincerely,
Jorge G. Maldonado, P.E.
Project Manager
Attachments
•
P.:-: e,:
ranti!:3o Pz!k".:a��.r?lYn e't�Fi,je�ia;na.:-�..r:,
Fr:„x5alsw.j;-09�9(3ril:iina 6::9=ri1 Fddia<.aa?&aries prop,sal re.lame;*set9 n Ax::as 3 F.vinn:d'.,ai;•ry�;�.s
WOLFBERGALVAREZ.COM ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN
MC002416 E.6000M4
4
•
WOLFBERG ALVAREZ AND PARTNERS SCHEDULE B
July 9,2019 CITY OF MIAMI BEACH
FLAMINGO PARK
CONSULTANT'S COMPENSATION FEE SCHEDULE
+ PROJECT PROJECT SR.ENG ENGINEER'C "` � a.
TASKNQ TASKOESCRIPTION ORAF'fER CLERICAL TOTAL HOURS TOTALCOST �TOTRLSPER PHASE
.." - w � � � DIRECTOR MANARER ARCHI7�CT :ARCHITECT.:
Moddications to Landscaping Design and Related Walkway Configuration
DESIGN SERVICES $3,224.00
Protect Management 20 2 $296.00
Civil 0 8 16 $1,526.00
Architecture 0 0 0 $0.00
Structure 0 0 0 $0.00
Plumdnp 0 0 0 $0.00
Fire Protection 0 0 0 $0.00
Mechanical 0 0 0 $0.00
Electrical 0 8 14 $1,400.00
Landscaping-O'Leary Richards $16,600,00
CONSTRUCTION ADMINISTRATION SERVICES $15,392,00
Construction Administration Services 0 104 0 0 0 0 104 $15,392.00
0 106 16 0 14 0 136
$170.50 5145.00 $127.00 $107.00 $64.00 $49,20
''G
O'Leary
Richards
Design May 7,2019
Associates,
Inc. Mr. Marcel Morlote,AIA
Landscape Architecture&Planning Sr.Vice President
Wolfberg Alvarez&Partners
75 Valencia Avenue,Suite 1050
Coral Gables, FL 33134
Re: Landscape Architectural Services for:
Flamingo Park Ph.1-Additional Services
1200 Meridian Avenue
Miami Beach,Florida 33139
Dear Marcel:
Pursuant to your request, O'Leary Richards Design Associates, Inc. proposes to provide
additional landscape architectural services for the above referenced project. The basic
professional services to be included are as follows:
A) On-site meeting with City staff to review existing tree removals, disposition of
existing trees and modifications to plans.
B) Site visit to update Tree Survey per City Urban Forester request prior to arborist
visit.
C) Phone conferences and emails to coordinate existing tree removals with City, WA
and Arborist.
D) Update Phase Tree Disposition Lists based on Arborist report.
E) Review Arborist report from Starwood properties and make recommendation.
Incorporate off-site tree into Landscape Plan.
F) Revise Tree Disposition Plans per City direction(Sheets L0.3,L0.4, L0.5).
G) Revise Landscape Plans per City direction (Sheets L1.1, L1.1,L1.3, L2.1).
H) Revise Irrigations Plans to reflect modifications to the Site Plan and Landscape Plan
(Sheets IR1.1,IR1.2, IR1.3,IR2.1).
I) Re-evaluate existing trees on site and up-date Tree Resource Evaluation Report
prepared by certified arborist.
Our Lump Sum Fee for items A through J above will be Sixteen Thousand Six-Hundred Dollars
and 00/100 ($16,600.00). The work shall be performed in accordance with the terms and
conditions of the basic services agreement between O'Leary Richards Design Associates, Inc.and
Wolfberg Alvarez&Partners,Inc.dated September 12,2016.
If the proposed work and fees contained herein are agreeable with you, please sign the enclosed
copy of this letter and return same to our office. Should you have any questions regarding the
above,please do not hesitate to call.
Very truly yours,
Kathryn O'Leary Richards,ASLA
Accepted:
Oak Plaza Professional Center
8525 SW 92^d Street,Suite C-11
Miami,Florida 33156 By: Date:
Phone:305.596.6628 Mr.Marcel Morlote,AIA,President
Fax:305.596.9160 Wolfberg Alvarez&Partners
LC#26000195
Member of the
American Society of Landscape Architects
O'LEARY RICHARDS DESIGN ASSOC., INC. SCHEDULE B
June 24, 2019 CITY OF MIAMI BEACH
FLAMINGO PARK-PHASE 1
SUB-CONSULTANT'S COMPENSATION FEE SCHEDULE
LANDSCAPE
TASK DESCRIPTION
ARCHITECT TOTAL HOURS TOTAL COST TOTALSPER PHASE
T $
Modifications to Landscaping Design and Related
Walkway Configuration
DESIGN SERVICES $16,601.00
Landscape Architecture-O'Leary Richards 46 35 30 111 $16,601.00
CONSTRUCTION ADMINISTRATION SERVICES
T Construction Administration Services 0 0 0 0 $0.00
46 35 30 111
$178.50 $148.00 $107.00
I 1 ,
\‘ . p_eiti/Ao 1,, —11.46 * 1A #37
• 41 , o
. .-'. / 4)... ,:::'•
. 4
-. .
. .
. .•
• Cei MMUit,„, 1
i .. ... :, . • : , . - L_
• -... ••, •-. • . . • • '
• -...
1 .... - -...4.-'. .:4 . ' '12 ' S!,: ••
_., . ,
0 -_ _.-• ,..• 2.. lir li 'Ir.'
.11IP -- 6" SD , locala 11:5114-pele. •
.••
.....,,,;....-4,........' ./...•'..- • ' .s'....:. -;..-..:'..,.,,':-.. '• - - '-''.,• '•:• .' ••,;,•.;,"P• A..v':A:•:..A.i.4..:":.---,.--.1.--•' .s.—..o.."-.-.di.t..l-i..4 .-.P.'-4.1..1:.:4-N,_•..,:i•..,..:,::";,.2.7..:.::'...:
-,7•;
SOd.r' . ... •
i
1175,sfj (866s0Proposed 80dSd...e.'•W.. 8-A1k
° •
. :.
i (160 f)
. It • •r-..•..; 0 •
. .. . . . :
*a • • . ' :
' * .k
• •1
* ,.. A,_ A . 1111 . 4 roe,. •••. .. .....1 .100, k i . .4 .
. . , . .
T . • .. .:,
r4:,,.... -
,
.. . .r.
. ......_ .
BWiliglEIWEWfaittoV41710&. ,.. . ', - ;.:..4.....'. . '- )) .•.. ,.
_ •. --
. ,. - ,•' ,,, gedeovelkt .
k... . . ... . •
(1460 sf) AIN LINK FENCE
LI
..c - -* ' • ?ea *)149S'
Sipe\ • •.:''.. ': 1:-p' ..-- •- • .. "- ,.,-, .. in via.
EL. EXIST (320 sf)
1-.... . .
SIGN
4.. 'N. #361
cn
\ 0
(J)
4.,
r 4
#360 \
1'4•
/ ( --It #55/ • . ,
, --• _ , ,.., ,
,,
s #56v
Ptiocafi If :p ole, -, - --- . ( , . - -- •- ',.' .
.,. • ‘ ,-.-- :::7-......:::::::.
Palo* giitivid --641,461+ --
-- -1
...-1---- --- ( ( ' .,
. . .
,--- ---- •..., '•-;;;04," -11:::-::.,:,:•:;../
LIMIT OF LANDSCAPE ..—
WORK-PHASE 1 -- -- #570I ,I.,..=,•.'•.:;-,,;:. ;•••. i,
, —. r \ -- . ...::•:11: :::'' -
•
1.---- ---..
--1---- 1_57/ „.,,f;:::!...... • ma ...
-- -
'BE MIIIP,1 - '.791A7 )
J. , ••sallailabilliffiffigriillarrillIJNE., ..."wirMielinl
• 1 1 .
.. .'- .1 fer.'TW'.----.-- -A,1$'1W1101.Ite7.4 03S...../Adell.. ASAdarn* *.....w a m•0 r a ot m 3.0 m m••i.im mi mk....,.,.....,....,..,...,Nate/'"'n 7'''AffAriffiZeefe •
0 - ,
..',7:::...1'.:::?.;. NO-17'.; .-....7..,•?.*•;",*=': :\:,".2'. •;.' :.•e.::: -::;'!';.,!:. '',--:
I 1
..,',.::',.;.:! .:',, Aill SI gW=riltSt. . .' ."-- :;''', I.P..i‘ ;:: z,":! .,,':,1 ...:7 74'4415/ : , • .. . f ''
- '
' . '-V- •./ / /' .4,7-'7/7'77
., ./;;)f,- ../..,//// •— ---. 1141111 . w."BILLBOARD kORE. .:,:' ;.''','..!:::''':',, :!-'::::::, ,,,
j:////,///,i ,//,,/iy,,,/ ,-//,/,/,///- /-/• -////// :////IP-
,.',%.16,-. :5;'",-(,;".•'7.".;:4.5":,/,,,vi", .;%/V. /-0/-% ././...-,/,0e...%:4;'.1 - • ''''' #579,1 . ..- -.--s.,..:,. ..c,....:\
MOS1o0dsf) -,•.•:,..:
, ---.. I . • . .
. ..., ...."'. •' .
,• :T., ,
NI ..
/ 1 „, ., • • 0, ......- '41#4: %.:;::'‘.:','. a lit ,
PROPOSED BENCH
290 Ak I i
LOCATION(TYP)
::..•:•' :
tt NW QuVi ----
„ —, .,,,k IT OF LANDSCAPE . , .
, . I ...'-:'.:..:.
EXIST / \t I Pe, , . ,...
Ai
I . .
ORAJVT
1 4 .w ORK-PHASE 1 ,
. .
' .s.:%.1:-:: .:.%.1...:,'
i 1 CA ,. ..• , . .. •og :.:,•,.
, .
E 2 I i
• PO k -1 .... ",
., . ,, 1.1 I •i
QuVi
BENCH.1 7. PhCa 41101,,, ' :,
... I '
,...e
OYP) 7'. 4.:
DOG PARK ) :Li . ..•
-/- I A -- • , , r
:II::
GATE\ 1 el"wIlit •
% 1
HYDRANT (
I Cr& - shrii. 4 sf ( ..:•.i?,.•',,-..:„‘:::::.„? .:::.,:1--
BENCH A \— i i ,,........-:,--„;:? ;:;:.•.....:... '..:-:1-.,.. .
_.._.
(TYP) I / r \ LIMIT QF LANDSCAPE
-X-X-X1 1 . i WORK-PHASE 1 -.• :.::.:...:..:; :-': •