Loading...
159-94 RDA RESOLUTION NUMBER 159-94 A RESOLUTION OF THE MIAMI BEACH REDEVELOPMENT AGENCY APPROVING AN AWARD OF BID FOR SELECTIVE DEMOLITION AND REPAIR ON LINCOLN ROAD HALL, PURSUANT TO BID NO. 67-93/94, AND AUTHORIZING THE CHAIRMAN AND SECRETARY TO ENTER INTO A CONTRACT WITH E. W. REED, INC. FOR THE WORK. WHEREAS, on March 15, 1994, Invitation to Bid Number 67-93/94 was issued by the City of Miami Beach for Selective Demolition and Repair on Lincoln Road Mall (the Bid); and WHEREAS, pursuant to the issuance of the Bid, a bid opening was held in the City's Purchasing Department on March 31, 1994, resulting in the receipt of three (3) responses; and WHEREAS, E. W. Reed, Inc. furnished the lowest bid, totalling $29,301.00; and WHEREAS, the Agency herein recommends that the bid of E. W. Reed, Inc. be accepted, and a contract for the services be executed by the Chairman and Secretary. NOW, THEREFORE, BE IT DULY RESOLVED BY THE CHAIRMAN AND SECRETARY OF THE MIAMI BEACH REDEVELOPMENT AGENCY, that the Agency herein approves the award of the bid to E. W. Reed, Inc. for Selective Demolition and Repair on Lincoln Road Mall, in the amount of $29,301. 00. PASSED and ADOPTED this 6th ATTEST: 7\l~~A ~ -(~ SECRETARY FORM APpqnVED 'L~'~/?I, ( // B~ ~:3:;~ Date Lj /6,/'1 f/ Miami Beach Redevelopment Agency 1700 Convention Center Drive Miami Beach, Florida 33139 Telephone: (305) 673-7193 Fax: (305) 673-7772 REDEVELOPMENT AGENCY MEMORANDUM NO. 94-10 Date: April 6, 1994 TO: Chairman & Members of the Board FROM: Roger M. Carlton Executive Directo SUBJECT: AWARD OF BID NO. 67-93/94, SELECTIVE DEMOLITION AND REPAIR ON LINCOLN ROAD MALL ADMINISTRATION RECOMMENDATION: It is recommended that the Board authorize award to the lowest bidder meeting specifications, E.W. Reed, Inc. CONTRACT AMOUNT AND FUNDING: $29,301.00 Funds are available from the proceeds from the sale of the Convention Center Tax Increment Financing Bond (TIF) BACKGROUND: This contract includes the total cost for supplying all labor, materials, tools, equipment and supervision necessary to complete the selection demolition and repair work on Lincoln Road Mall. The structures which will be demolished include: all pedestrian light fixtures, light fixtures and conduit from seven shade structures, lean- to awning structures on the 400 Block, concrete pedestals at west end of the 400 Block, brick seating on the 600 Block, and the glass and metal infill, interior partitions, and metal rails of the "Triangle" structure on the 500 Block. A mandatory pre-bid conference and walk-through inspection were held on March 24, 1994 at 10:30 a.m. Only those vendors who attended were permitted to submit bids for this contract. All prospective bidders were advised that this project must be completed by April 28, 1994, and that construction activities that are disruptive shall occur after 9:00 p.m. to minimize disruption to commercial activities. Scheduling or sequencing of work shall be coordinated between all contractors and a representative of the City of Miami Beach, as several other improvement projects will be in progress at the same time. ANALYSIS: One-hundred forty-six notices and fourteen specifications were mailed for this bid which opened on March 31, 1994, resulting in the receipt of three bid responses. BIDDER LUMP SUM BID E.W. Reed, Inc. Marks Brothers, Inc. Aarya Construction $29,301.00 32,000.00 78,430.00 CONCLUSION: Based on the fact that the lowest bidder meets all specifications and took no exceptions, this award should be made to E.W. Reed, Inc. RMC:MDB:jf ITEM 4-B S()UTti V()I~ ~edevel()pment Ulstl1f:t Crn' Cr:~~ ~edevel()pment UIstr1f:t 12