Loading...
Street Pavement Map_9.19.19Mid Beach South Beach North Beach W 44TH ST A L T O N R D MAC ARTHUR CSWY WB A L T O N R D C O L L I N S A V E79TH C S W Y 17TH ST I N D I A N C R E E K D R 23RD ST A L T O N R D N B IN DIA N C R E E K D R H A R D I N G A V E A L T O N R D 71ST S T A B B O T T A V E 1 9 5 - A L T O N R A M P O N W B W 63R D ST 5TH ST W 41ST ST P I N E T R E E D R C O L L I N S A V EDADE B L V D N O R M A N D Y D R L A G O R C E D R VENETIAN CSWY MAC ARTHUR CSWY EB A L T O N R D I 195 WB I 195 EB Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user community SCALE REQUESTED FILENAME DRAWN DATESHEETNO. T r a c k I t N u m b e r 1 1 Street Work PlanMiami BeachMiami-Dade County, FL 09/17/2019 WORKHerSNot To ScaleRoy Coley MiamiBeachGIS 0 0 0 0 0 0 µ Miami Beach GIS • 1700 Convention Center Drive • Miami Beach, FL 33139 • 305.673.7000 • gis@miamibeachfl.gov • www.miamibeachfl.gov F:\WORK\$ALL\Pavement Management\Operations 5 Year Work Plan\GOB\Maps\ArcMap\street_QW_10_511X17.mxd State & County Roads In Progress by C.I.P. Near Future Neighborhood Projects Part 1 - Streets Work PlanGOB Status Part 1 Completed Part 1 Scheduled 3 Month Work Ahead 09/17/2019 Streets Completed Square Yards Lane Miles Cost Meridian Ave from 15th Street to 5th Street 20,726 3.5 369,082.60$ Allison Rd from 63rd Street to the end 9,901 1.7 146,236.70$ Biarritz Dr from Normandy Dr to South Shore Dr.3,656 0.6 55,221.80$ Miamonides Street from Rue Notre Dame to Vichy Dr 2,773 0.6 26,771.30$ Total 37,056 6.4 597,312.40$ General Obligation Bond Progress Report Quick wins completed except for small portion of Biarritz Schedule has been modified going forward to reflect current contract pricing Notes: