Resolution 2019-30978 RESOLUTION NO. 2019-30978 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ADOPTING THE TENTATIVE CAPITAL IMPROVEMENT PLAN FOR FISCAL YEARS (FY) 2020 — 2024 AND ADOPTING THE CITY OF MIAMI BEACH TENTATIVE CAPITAL BUDGET FOR FY 2020, SUBJECT TO A SECOND PUBLIC HEARING SCHEDULED ON WEDNESDAY, SEPTEMBER 25, 2019 AT 5:03 P.M. WHEREAS, the FY 2020 — 2024 Capital Improvement Plan (CIP) for the City of Miami Beach is a five-year plan for public improvements and capital expenditures by the City and is an official statement of public policy regarding long-range physical development in the City of Miami Beach; and WHEREAS, the first year of the FY 2020 — 2024 CIP represents the tentative Capital Budget appropriation for FY 2020; and WHEREAS, the tentative CIP has been updated to include projects that will be active during FY 2020 through 2024; and WHEREAS, the tentative Capital Budget itemizes project funds to be committed during the upcoming fiscal year and details expenditures for project components which include architectural and engineering, construction, equipment, Art in Public Places, and other related project costs; and WHEREAS, capital funding priorities for FY 2020 were discussed at the June 14th, and July 19th meetings of the Finance and Citywide Projects Committee ("the Committee") and adjustments were made to the funding recommendations presented per direction from the Committee; and WHEREAS, the tentative Capital Budget for FY 2020 totals $88,171,516 and is recommended by the Administration for adoption at this time for projects and capital equipment acquisitions; and WHEREAS, based on current schedules, additional water, sewer, and storm water projects are financed over a series of years; and WHEREAS, under this approach, the City utilizes a line of credit to allow the necessary rate capacity to issue additional tax-exempt bonds through rate increases and also spend down the current committed, but unspent, bond proceeds; and WHEREAS, the proposed sources of funding for the tentative FY 2020 Capital Budget, as amended at the September 11th, 2019 City Commission Meeting, are included in Attachment "A" and the projects to be adopted in the tentative FY 2020 Capital Budget and the five-year CIP are included in Attachment "B." NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby adopt the Tentative Capital Improvement Plan (CIP) for FY 2020 through 2024 and adopt the City of Miami Beach Tentative Capital Budget for FY 2020, subject to a second public hearing scheduled at 5:03 p.m., Wednesday, September 25, 2019. PASSED AND ADOPTED this 11th day of September, 2019. ATTEST: '. Dan Gelbe , ayor ,-��� 1 ri . t ? NP •- 04 �: s.-..� .;,te,•.;� Rafael E. Granado, ity Clerk ,„ : .0.11,.., * .INCORPORATED; 2dH••26ofTM APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION .4,14/‘ f —— ', 1 -3g ,(( (3-(- City A#orney Date / ATTACHMENT A IA V 1 I E FCITY OF MIAMI BEACH FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY PROJECT PROJECT NAME Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 106 TRANSPORTATON FUND 106 20118 BAYSHORE NEIGH.TRAFFIC CALMING 1A 378,075 - - - - - - 378,075 20218 NAUTILUS TRAFFIC CALMING PHASE I 355,500 - - - - - - 355,500 20221 16TH STREET PROTECTED BIKE LANES - - 627,000 - - - - 627,000 20318 VENETIAN ILLUMINATED CROSSWALKS 180,000 - - - - - - 180,000 20617 NEW BUS SHELTER DESIGNS 504,251 - - - - - - 504,251 20620 LA GORCE I PINE TREE DR BIKE LANES - - 300,000 1,500,000 - - - 1,800,000 21522 ALTON ROAD SHARED USE PATH PHASE II - - - - - - 3,631,000 3,631,000 60222 NORTH BEACH GREENWAYS PHASE III - - - 1,170,220 - 1,170,220 60327 10TH&11TH STREET NEIGHBORHOOD - - 1,494,000 - - - - 1,494,000 60817 SAFE ROUTES-BISCAYNE ELEMENTARY 70,628 - - - - 70,628 62521 NORTH BEACH GREENWAYS-PHASE II - - 604,230 - - - 604,230 69820 NORTH BEACH GREENWAYS PHASE I - 448,625 - - - - - 448,625 Fund Total: 1.488,454 448,625 3,025,230 2,670,220 - - 3,631,000 11,263,529 115 HUD SECTION 108 LOAN 23220 NORTH SHORE NEIGH.IMPROVEMENTS 1,011 391 - - - - - 1,017,391 Fund Total: 1.017,391 - - - - - - 1,017,391 117 CLEAN WATER STATE REVOLVE FUND 68000 CLEAN WATER SYSTEM 7,500,000 - - - 7,500,000 Fund Total: 7,500,000 - - - - - 7,500,000 121 SUNSET ISLAND 3&4 UNDERGROUND 69790 SUNSET 3&4 UTILITY PAYMENT 1.532.002 - - - - 1,532,002 Fund Total: 1,532,002 - - - - - - 1,532,002 125 CAPITAL RENEWAL&REPLACEMENT 20000 PAVEMENT&SIDEWALK PROGRAM 500,000 - - - - - 500,000 21818 PROPERTY MGMT FACILITY GENERATOR 95,000 - - - - - - 95,000 27800 STREET LIGHTING IMPROVEMENTS 300,000 - - - - - - 300,000 28410 SCOTT RAKOW PLAYGROUND 18,887 - - - - - - 18,887 28550 LIFEGUARD STAND REPLACEMENTS 141,189 - - - - - 141,189 60007 POLICE STATION NEW GENERATOR 555,000 - - - - - 555,000 60019 777 BUILDING-CHILLER REPLACEMENT 138,000 - - - - - 138,000 60030 POLICE STATION MEN'S LOCKER ROOM 228,871 - - - - - - 228,871 60031 WATER TOWER RESTORATION STAR ISLAND - - 350,000 - - - - 350,000 60037 SCOTT RAKOW FIRE ALARM RENEWAL 71 - - - - - - 71 60038 SOUTH SHORE C.C.FIRE ALARM RENEWAL 112,086 - - - - - - 112,086 60047 POLICE STATION EMERGENCY LIGHTING 27,245 - - - - - - 27,245 60087 SCOTT RAKOW CENTER SECURITY SYSTEM 53,440 - - - - - - 53,440 60118 POLICE STATION BACKUP CHILLER 151,000 - - - - - - 151,000 ATTACHMENT A I,� E AC H CITY OF MIAMI BEACH V FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY PROJECT PROJECT NAME Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 60218 STORAGE TANK REPLACEMENT 4,300 - - - - - - 4,300 60220 UNIDAD BUILDING-ROOF REPLACEMENT - 80,000 - - - - - 80,000 60318 SCOTT RAKOW YOUTH CENTER GENERATOR 16,863 - - - - - - 16,863 60418 HISTORIC CITY HALL HUMIDITY CONTROL 98,068 - - - - - - 98,068 60420 FIRE STATION 2-A/C REPLACEMENT - - 105,000 - - - - 105,000 60519 CITY HALL 40-YR STRUCTURAL 100,000 - - - - - - 100,000 60520 MBPD-CONDENSER AND PUMPS - - 125,000 - - - - 125,000 60618 HISTORIC CITY HALL FIRE ALARM 151,618 - - - - - - 151,618 60619 MBPD-COOLING TOWER BASE REPAIR 150,000 - - - - - - 150,000 60637 COLONY THEATER HVAC REPLACEMENT 228,000 - - - - - - 228,000 60718 NORTH SHORE PARK YOUTH CENTER NC 90,000 - - - - - - 90,000 60719 UNIDAD ELEVATOR MODERNIZATION 70,000 - - - - - - 70,000 60819 777 BUILDING-ROOF RESTORATION 62,000 - - - - - - 62,000 60821 CITY HALL-REPLACE RESTROOM EXHAUST - - 35,000 - - - - 35,000 60919 SSCC BATHROOM AND KITCHEN UPGRADE 150,000 - - - - - - 150,000 60921 N.SHORES GOLF CLUB-CLUBHOUSE ROOF - - 175,000 - - - - 175,000 61018 FIRE STATION 3 KITCHEN RENEWAL 20,683 - - - - - - 20,683 61021 MB POLICE GARAGE CONCRETE SPALLING - - 800,000 - - - - 800,000 61100 P.A.L.BUILDING-FIRE ALARM 95,000 - - - - - - 95,000 61119 SSCC PLAYGROUND AREA MITIGATION 85,000 - - - - - - 85,000 61120 CITY HALL-COOLING TOWER BASE - 100,000 - - - - - 100,000 61121 SCOTT RAKOW YOUTH CENTER-KITCHEN - - 150,000 - - - - 150,000 61221 NORM.ISLE POOL LOCKER ROOM&PUMPS - - 250,000 - - - - 250,000 61290 CITY HALL FIRE ALARM SYSTEM 314,325 - - - - - - 314,325 61320 UNIDAD BUILDING-DOOR RENEWAL - - 40,000 - - - - 40,000 61321 71ST STREET WELCOME SIGN RENOVATION - - 40,000 - - - - 40,000 61420 UNIDAD BUILDING-WINDOW SEAL RENEWAL - - 40,000 - - - - 40,000 61421 CITY HALL WATER FOUNTAIN - - 32,000 - - - - 32,000 61521 CITY HALL LOADING DOCK RESURFACING - - 70,000 - - - - 70,000 61621 CITY HALL CHAMBER ACOUSTICAL FLOOR - - 60,000 - - - - 60,000 61721 CITY HALL CHAMBER FF&E RENEWAL - - 105,000 - - - - 105,000 61821 C.H.CHAMBER ACOUSTICAL WALL CARPET - - 212,000 - - - - 212,000 61921 10TH ST.AUDIT.ENTRANCE DRAINAGE - - 250,000 - - - - 250,000 62021 COLONY THEATER ELEVATOR - - 75,000 - - - - 75,000 62117 FIRE STATION#2 TRAINING TOWER - - 320,000 - - - - 320,000 62121 BOTANICAL GARDENS RESTROOMS - - 50,000 - - - - 50,000 62217 10TH ST AUDITORIUM COATING OF ROOF - - 60,000 - - - - 60,000 62221 COLONY THEATER RESTROOM RENOVATION - - 50,000 - - - - 50,000 ATTACHMENT A CITY OF MIAMI BEACH /A A AI-i FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY PROJECT PROJECT NAME Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 62321 COLONY THEATER EXTERIOR PAINTING - 80,000 - - - - 80,000 62410 SOUTH SHORE COMMUNITY CTR FLOORING 105,494 - - - - - - 105,494 62421 COLONY THEATER LED LIGHTS UPGRADE - 40,000 - - - - 40,000 62820 P.A.L.BUILDING-ROOF REPAIRS90,000 - - - - - 90,000 62920 FIRE STATION#2 WATERPROOFING192,000 - - - - - 192,000 63020 GARAGE DOOR AT FIRE STATION 4 - 30,000 - - - - 30,000 63080 BEACH RESTROOMS PAINT AND CONCRETE 225,000 - - - - - - 225,000 63350 POLICE HQ ELEVATORS&OTHER PROJECT 396,798 - - - - - - 396,798 63420 NS YOUTH CNTR ROOFTOP A/C RENEWAL - 125,000 - - - - 125,000 63520 MBPD NORTH SUB STN-ROOF HARDENING - 200,000 - - - - 200,000 63620 CITY HALL CHILLED&CONDENSER PUMPS - 50,000 - - - - 50,000 63718 SANITATION INTERIOR REPLACEMENT 285,000 - - - - - - 285,000 63720 10TH ST AUDITORIUM-LOUVER - 50,000 - - - - 50,000 63770 FY 08 FIRE STATION 1 356,275 - - - - - - 356,275 63918 PUBLIC WORKS FACILITY RENOVATION 101,111 - - - - - - 101,111 64020 CITY HALL CARD ACCESS SYSTEM REPLAC 80,436 - - - - - - 80,436 64320 CITY HALL-COOLING TOWER CONDENSER90,000 - - - - - 90,000 64620 ALLISON BRIDGE RAILING PROJECT - 60,000 - - - - 60,000 64720 FIRE STATION 2 EXT PAINT&LIGHTING - 55,000 - - - - 55,000 65120 GREENSPACE FACILITY SECURITY SYSTEM - 110,000 - - - - 110,000 65218 PURDY AVE BOAT RAMP REPAIRS 41,100 - - - - - - 41,100 65318 BOTANICAL GARDEN HVAC REPLACEMENTS 70,000 - - - - - - 70,000 65319 CODE/HOUSING OFFICES RELOCATION 530,000 - - - - - - 530,000 65320 UNIDAD INTERIOR&EXTERIOR PAINTING - 89,000 - - - - 89,000 65420 MBPD NORTH SUB STATION PARKING LOT - 230,000 - - - - 230,000 65520 MBPD N SUB STN PAINTING,FLOORING - 234,000 - - - - 234,000 65720 HISTORIC CH-ROOF ACCESS LADDER - - 100,000 - - - 100,000 65920 MBFD STATIONS SECURITY UPGRADES CW - - - 126,000 - - 126,000 66020 CITY HALL-MAIN ENTRANCE PAVERS - 152,000 - - - - 152,000 66220 HISTORIC CITY HALL ELEVATOR350,000 - - - - - 350,000 66720 COLONY THEATER-SOUND AND VIDEO - 100,000 - - - - 100,000 66820 BASS MUSEUM-OFFICE FLOORING - 44,000 - - - - 44,000 67030 MARINE PATROL EXTERIOR RESTORATION 68,100 - - - - - - 68,100 67040 NORMANDY ISLE PARK&POOL 200,000 - - - - - - 200,000 67200 FIRE STATION 3 FIRE ALARM UPGRADE 55,000 - - - - - 55,000 67210 CITY HALL ROOF&SKYLIGHT 200,000 - - - - - - 200,000 67220 FIRE STATION 3 EMERGENCY GENERATOR 28,955 - - - - - - 28,955 67240 777 BUILDING HVAC 4TH FLOOR 170,000 - - - - - - 170,000 ATTACHMENT A f V T IM BEj CITY OF MIAMI BEACH jJ"'1i, FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY PROJECT PROJECT NAME Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 68520 FS 3-INTERIOR&OVERHEAD DOOR REPLACE 107,678 - - - - - - 107,678 68720 POLICE HQ&PARKING GARAGE-FIRE ALA 222,033 - - - - - - 222,033 68760 CITY HALL ELECTRICAL UPGRADES 341,500 - - - - - - 341,500 69220 PUBLIC WORKS FACILITY GENERATOR 187,063 - - - - - - 187,063 69480 MARINE PATROL EMERGENCY GENERATOR 104,515 - - - - - - 104,515 69960 SOUTH SHORE COMMUNITY ELEVATOR 169,934 - - - - - - 169,934 Fund Total: 8,002,638 902,000 5,043,000 100,000 126,000 - - 14,173,638 126 SOUTH POINTE RENEWAL&REPLACE 29130 SOUTH POINTE MISCELANEOUS IMPR. 468425 - - - - - - 468 425 65219 SOUTH POINTE PARK HVAC REPLACEMENT 25,000 - - - - - - 25 020 Fund Total: 493,425 - - - - - - 493,425 131 COMMUNITY DVLPMNT BLOCK GRNT 60657 NEPTUNE APARTMENTS REPAIRS 333,860 - - - - - - 333,860 62618 MADELEINE VILLAGE 204,623 - - - - - - 204,623 Fund Total: 538,483 - - - - - - 538,483 132 COMM.DEV.BLOCK GRANT-YR 40 20427 LOTTIE APARTMENTS 111,313 - - - - - - 111,313 65418 BISCAYNE BEACH HOUSE(AFFORDABLE HOUSING) 336.500 386,037 - - - - - 732,537 Fund Total: 447,813 396,037 - - - - • 843,850 133 COMM.DEV.BLOCK GRANT-YR 35 60657 NEPTUNE APARTMENTS REPAIRS 603,046 - - - - - - 603,046 Fund Total: 603,046 - - - - - - 603,046 135 COMM.DEV.BLOCK GRANT-YR 37 20427 LOTTIE APARTMENTS 46,423 - - - - - - 46,423 Fund Total: 46,423 - - - 46,423 137 CDBG FY 2015-2016 YR 41 20427 LOTTIE APARTMENTS 542,554 - - - - - 542,554 60657 NEPTUNE APARTMENTS REPAIRS 14,000 - - - - - - 14,000 Fund Total: 556,554 • - - - - - 556,554 ATTACHMENT A CITY OF MIAMI BEACH t FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY PROJECT PROJECT NAME Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 139 COMM.DEV.BLOCK GRANT-FY16-17 60657 NEPTUNE APARTMENTS REPAIRS 25.050 - - - - - 25,050 Fund Total: 25,050 - - - - - - 25,050 140 CULTURAL ARTS COUNCIL ENDOWMNT 20418 COLLINS PARK PERFORMING ARTS VENUE 800,000 - - - - - 800,000 Fund Total: 800,000 - - - - - - 800,000 142 7TH STREET GARAGE 20026 7TH STREET GARAGE-ELEVATOR - - - - - - 400,000 400,000 60224 7 ST GARAGE-SUPERSTRUCTURE RENEWAL - - - - - - 250,000 250,000 21121 7TH ST GRGE-ENTRANCE FLOOD CONTROL - - 275,000 - - - - 275,000 22150 72ND ST PARK AND PARKING STRUCTURE - 128,296 - - - - 128,296 26100 GARAGE SECURITY CAMERA SYSTEM 53,585 - - - - - - 53,585 27830 PARKING GARAGE AT 1262 COLLINS AVE 2,563,569 - - - - - - 2,563,569 60124 7TH STREET GARAGE-LANDSCAPING - - - - - 120,000 - 120,000 60422 7TH ST GARAGE-FIRE SPRINKLER&PUMP - - - 300,000 - - - 300,000 60620 7TH STREET GARAGE-INTERIOR DRAINAGE - 30,000 - - - - - 30,000 60623 7TH STREET GARAGE-STAIRWELL RAILING - - - - 25,000 - - 25,000 60723 7TH ST GARAGE-TRAFFIC COATING - - - - 150,000 - - 150,000 61118 7TH STREET GARAGE UPGRADE LIGHTING 200,000 - - - - - - 200,000 61218 7TH STREET PARKING GARAGE ROOF TOP 30,000 - - - - - - 30,000 61760 REVENUE CONTROL EQUIPMENT PHASE I 303,000 - - - - - - 303,000 62621 7TH STREET GARAGE-OFFICE/RESTROOM - - 30,000 - - - - . 30,000 64719 7TH STREET GARAGE-DOOR REPLACEMENT 50,000 - - - - - - 50,000 67520 7TH STREET GARAGE-ROOFING REPAIRS - 84,000 - - - - - 84,000 68220 7TH ST GARAGE SURFACE RESTORATION - 95,000 - - - - - 95,000 69310 7TH ST.GARAGE FIRE ALARM SYSTEM 51,087 - - - - - - 51,087 Fund Total: 3,251,241 337,296 305,000 300,000 175,000 120.000 650,000 5,138,537 147 ART IN PUBLIC PLACES 20377 AIPP MB CONVENTION 7,530,797 - - - - - - 7,530,797 22618 AIPP FIRE STATION 2 95,334 - - - - - - 95,334 22718 AIPP FLAMINGO PARK PROJECT 194,000 - - - - 194,000 22918 AIPP LUMMUS PARK PROJECT 116,000 - • - - - - 116,000 27810 AIPP ART PROJECT SOUNDSCAPE 352,000 - - - - 352,000 Fund Total: 8,288,131 - - - - 8,288,131 ATTACHMENT A CITY OF A I A I B EAC EACH FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY PROJECT PROJECT NAME Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 151 HOME INVEST PART PROG.GRANT 65418 BISCAYNE BEACH HOUSE AFFORDABLE HOUSING 742,500 271,000 - - - - - 1,013,500 Fund Total: 742,500 271,000 - - 1,013,500 155 FEES IN LIEU OF PARKING 28080 INTELLIGENT TRANSPORT SYSTEM 3,192,028 - - - - - - 3,192,028 Fund Total: 3,192,028 - 3,192,028 155 PARKING IMPACT FEES 20087 GARAGE AT P23-1623 WEST AVENUE 88,786 - - - - - - 88,786 20518 SURFACE LOT AT BISCAYNE BEACH 600,000 - - - - - - 600,000 22150 72ND ST PARK AND PARKING STRUCTURE 300,000 - - - - - - 300,000 27830 PARKING GARAGE AT 1262 COLLINS AVE 7,145,125 - - - - - - 7,145,125 Fund Total: 8,133,911 - - - - - 8,133,911 158 CONCURRENCY MITIGATION FUND 20200 TRANSPORTATION CAPITAL INITIATIVE 8,192,028 - - - - 8,192,028 25750 WEST AVE BDG OVER COLLINS CANAL 908,068 - - - - - - 908,068 28080 INTELLIGENT TRANSPORT SYSTEM 11,063,972 - - - 11,063,972 Fund Total: 20,164,068 - - - - 20,164,068 160 RESORT TAX FUND 2% 20200 TRANSPORTATION CAPITAL INITIATIVE 10,000.0[0 - - - - - - 10,000,000 Fund Total: 10,000,000 - - - - - - 10,000,000 164 RDA CITY CENTER RENEWAL&REPL 29300 LINCOLN RD LENOX-COLLINS W/SIDE STR 20,000,000 - - - - - . 20,000,000 64819 COLONY THEATER-FIRE ALARM SYSTEM 78,000 - - - - - - 78,000 64919 FILLMORE-SITE LIGHTING RENOVATION 60,000 - - - - - - 60,000 66120 LINCOLN RD STONE RESTORATION - 214,619 - - - - - 214,619 Fund Total: 20,138,000 214,619 - - - - 20,352,619 165 NON-TIF RDA FUND 20197 CITY CENTER RESILIENCY ENHANCEMENTS 1,000,000 - - - - - 1,000,000 20200 TRANSPORTATION CAPITAL INITIATIVE 8,000,000 - - - - 8,000,000 23270 CITY CENTER COMMERCIAL DISTRICT BPB - 6.955,15.1 - - - - 6,955,154 28140 CONVENTION CENTER HOTEL 600,000 - - - 600,000 66120 LINCOLN RD STONE RESTORATION - 153,381 - - - - - - 153,381 Fund Total: 9,600,000 153,381 6,955,154 - - - 16,708,535 169 MIAMI CITY BALLET FUND 27780 MIAMI CITY BALLET WINDOWS 315.000 - - - - - - 315,000 64618 MIAMI CITY BALLET VARIOUS REPAIRS 278.250 - - - - - - 278,250 Fund Total: 593,250 - - - - - - 593,250 171 LOCAL OPTION GAS TAX ATTACHMENT A CITY OF MIAMI BEACH A �� FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY PROJECT PROJECT NAME Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 20000 PAVEMENT&SIDEWALK PROGRAM 1,695,000 - - - - - - 1,695,000 21024 PROTECTED BICYCLE LANES - - - - 117,659 - 1,980,000 2,097,659 21219 SR A1A/COLLINS AVE INTERSECTION IMP 559,000 - - - - - - 559,000 23020 ALTON RD&16TH STREET INTERSECTION - 540,000 - - - - - 540,000 64918 SMART LIGHTING MASTER PLAN 203,000 - - - - - - 203,000 Fund Total: 2,457,000 540,000 - • 117,659 - 1,980,000 5,094,659 182 HOME INVEST PART.PROG.GRANT 20427 LOTTIE APARTMENTS 128,756 - - - - - - 128,756 Fund Total: 128,756 128,756'. 184 HOME INVEST PART.PRGRM GRNT 62618 MADELEINE VILLAGE 344482 - - - - - - 344,482 Fund Total: 344,482 - - - - - 344,482 186 HOME INVEST PART PROG FY18-19 20427 LOTTIE APARTMENTS 472580 - - - 478,580 Fund Total: 478,580 - - - - - - 478,580 187 HALF CENT TRANS.SURTAX COUNTY 20220 SEAWALL-DICKENS AV SHORELINE 200,000 - - - - - 200,000 20597 WEST AVENUE PHASE II 530,000 - - - - - 530,000 20618 MERIDIAN AVENUE BICYCLE LANES 250,000 - - - - - 250,000 20718 SIGNALIZATION ALTON RD AND 4TH ST 580,000 - - - - - 580,000 20818 ROYAL PALM NEIGHBORHOOD GREENWAY 430,000 - - - - - 430,000 21014 PROJECTED BIKE LANES - 130,000 - 524247 202,341 - - 856,588 21319 ROYAL PALM AVE&46TH STREET CIRCLE 107,000 - - - - - - 107,000 21419 MERIDIAN AVENUE PEDESTRIAN CROSSING 410,000 - - - - - - 410,000 22518 ENHANCED CROSSWALKS 480,000 - - - - - - 480,000 23360 WEST AVE/BAY RD NEIGH. 378,000 - - - - - - 378,000 25650 CITYWIDE CURB RAMP INSTALLATION 80,560 - - - - - - 80,560 25750 WEST AVE BDG OVER COLLINS CANAL 1,966,380 - - - - - - 1,966,380 26700 ROW IMPROVEMENT PROJECT 1,844,084 - - - - - - 1,844,084 27860 51ST BIKE LANE-ALTON RD TO PINETREE 50,000 - - - - - - 50,000 27870 72ND STREET PROTECTED BIKE LANE 519,000 - - - - - - 519,000 27880 73RD STREET PROTECTED BIKE LANES 239,000 - - - - - - 239,000 27900 PRAIRIE AVE FROM 28TH ST TO 44TH PA 294,000 - - - - - - 294,000 27910 MERIDIAN AVE(NORTH)28TH ST&DADE 278,000 - - - - - - 278,000 27930 SHARED PATH ON PARKVIEW ISLAND PARK 320,000 - - - - - - 320,000 27940 EUCLID AVE.-FROM 17TH ST&5TH ST 470,000 - - - - - - 470,000 28050 EVERGLADES COURT ALLEYWAY PAVING 300,000 - - - - - - 300,000 28080 INTELLIGENT TRANSPORT SYSTEM 2,020,260 - - - - - - 2,020,260 ATTACHMENT A CITY OF MIAMI BEACH ( / A I\ t FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY PROJECT PROJECT NAME Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 29500 COLLINS CANAL ENHANCEMENT PROJECT 1,030,698 - - - - - - 1,030,698 29810 ALLEYWAY RESTORATION PH III 412,500 - - - - - - 412,500 60207 PAINTING VENETIAN BIKE LANES 486,558 - - - - - - 486,558 64210 SIDEWALK ASSESSMENT SURVEY 75,000 - - - - - 75,000 65518 JEFFERSON AVE&15TH ST BEACONS - 74,200 - - - - - 74,200 Fund Total: 13,751,040 204,200 - 524,247 202,341 - - 14,681,828 301 CAP.PROJ.NOT FINANCED BY BON 20110 28TH STREET OBELISK STABILIZATION 381,780 - 381,780 20200 TRANSPORTATION CAPITAL INITIATIVE 3,300,000 - 3,300,000 20220 SEAWALL-DICKENS AV SHORELINE 231,974 - - - - - 231,974 20597 WEST AVENUE PHASE II 8,861 - - - - - 8,861 22050 BAYSHORE NEIGH.BID PACK A 223,199 - - - - - - 223,199 23200 FLAMINGO PARK 896,690 - - 896,690 23518 BATTING CAGES AT NORTH SHORE PARK 250,000 - - - - 250,000 24530 SUNSET ISLANDS 182 GUARDHOUSE 448,225 20,000 - - - - - 468,225 24630 FLAGLER MONUMENT SOLAR ILLUMINATION 89,000 - - - - - 89,000 26270 COMMUNITY PARK(PAR 3)RENOVATIONS 412,100 - - - - - - 412,100 26990 SECOND FL.RENOVATION-BUILDING DEPT 629,898 - - - - - - 629,898 27950 NORTH BEACH OCEANSIDE PARK 8,460,000 1,250,000 - - - - - 9,710,000 29430 SOUTH POINTE PARK REMEDIATION 315,000 - - - - - - 315,000 60657 NEPTUNE APARTMENTS REPAIRS 15,978 - - - - - - 15,978 62718 N.BEACH PARKS RESTROOM RESTORATION 190,000 - - - - - - 190,000 Fund Total: 15,852,705 1,270,000 - - - 17122,705 302 PAY-AS-YOU-GO 20078 CITYWIDE STREET PAVEMENT - - - - - - 15,000,000 15,000,000 20187 LUMMUS PARK MUSCLE BEACH UPGRADE 68,000 - - - - - 68,000 20190 NORMANDY SHORES PK FITNESS CIRCUIT 199,500 - - - - - - 199,500 20220 SEAWALL-DICKENS AV SHORELINE 3,420 - - - - - - 3,420 20237 FAIRWAY DRAINAGE AND PLAYGROUND 1,272,000 - 670,000 - - - - 1,942,000 20247 CITYWIDE PARKS IRRIGATION SYSTEM 170,000 - - - - - - 170,000 20250 LAGORCE ISLAND-LIGHTING TREES MISC 66,376 - - - - - - 66,376 20300 NORMANDY ISLE PARK TURF REPLACEMENT 398,000 - - - - - - 398,000 • 20307 MBPD CAMERA SYSTEM UPGRADES 64,000 - - - - - - 64,000 20387 SOUNDSCAPE PARK 48,590 - - - - - - 48,590 20417 OCEAN RESCUE 79TH SUB HEADQUARTERS 168,000 - - - - - - 168,000 20418 COLLINS PARK PERFORMING ARTS VENUE 175,000 - - - - - - 175,000 20423 FLAMINGO PK FOOTBALL FENCE - - - - 450,000 - - 450,000 20425 FLAMINGO PARK SOCCER FIELD TURF - - - - - - 275,000 275,000 ATTACHMENT A CITY OF MIAMI BEACH g\f r i / FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY PROJECT PROJECT NAME Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 20523 STILLWATER PARK LIGHTING&SOCCER - - - - 475,000 - - 475,000 20577 BELLE ISLE PARK PLAYGROUND 294,585 - - - - - - 294,585 20597 WEST AVENUE PHASE II 2,059,587 - - - - - - 2,059,587 20607 11TH STREET-FLAMINGO NEIGHBORHOOD 1,059,729 - - - - - - 1,059,729 20623 MIAMI BEACH GOLF COURSE RENOVATION - - - - 5,000,000 - - 5,000,000 20721 GREENSPACE FACILITY RENOVATION - - 1,000,000 - - - - 1,000,000 20722 FLAMINGO PK PLAYGROUND REPLACEMENT - - - 750,000 - - - 750,000 20723 CRESPI PARK LIGHTING&MICRO SOCCER - - - - 468,500 - - 468,500 20821 BISCAYNE ELEM SHARED FIELD LIGHTING - - 1,270,170 - - - - 1,270,170 20822 FLAMINGO PK FOOTBALL STADIUM TURF - - - 425,000 - - - 425,000 20918 BRITTANY BAY PARK 1,243,000 - - - - - - 1,243,000 20921 NORMANDY ISLE PARK PLAYGROUND - - 480,000 - - - - 480,000 21018 BAYWALK PHASE 2 386,000 - - - - - - 386,000 21021 NSPYC KITCHEN&CABINETRY ADDITION - - 350,000 - - - - 350,000 21022 WEST LOTS 85-86 ST CONVERSION - - - 2,436,100 - - - 2,436,100 21118 STILLWATER ENTRANCE SIGN - - 195,000 - - - - 195,000 22050 BAYSHORE NEIGH.BID PACK A 960,405 - - - - - - 960,405 22150 72ND ST PARK AND PARKING STRUCTURE 100,000 - - - - - - 100,000 22420 POLO PARK LIGHTING&SOCCER FIELD - 857,680 - - - - - 857,680 22750 ALTOS DEL MAR PARK 44,820 - - - - - - 44,820 22920 CITYWIDE BRIDGES - 706,077 2,293,923 - - - - 3,000,000 23118 FIRE STATION 4 SECURITY ENHANCEMENT 90,000 - - - - - - 90,000 23180 BAYSHORE NEIGH.BID PACK D 745,500 - - - - - - 745,500 23200 FLAMINGO PARK 554,489 - - - - - - 554,489 23220 NORTH SHORE NEIGH,IMPROVEMENTS 150,000 - - - - - - 150,000 23240 LA GORCE NEIGHBORHOOD IMPROVEMENTS 450,000 - - - - - - - 450,000 23318 SOUNDSCAPE AUDIO IMPROVEMENTS 751,410 - - - - - - 751,410 23380 PALM&HIBISCUS ISLAND ENHANCEMENT 50,000 - - - - - - 50,000 24530 SUNSET ISLANDS 1&2 GUARDHOUSE 200,000 - - - - - - 200,000 24630 FLAGLER MONUMENT SOLAR ILLUMINATION 233,000 - - - - - - 233,000 24790 PARK VIEW ISLAND 52,162 - - - - - - 52,162 25750 WEST AVE BDG OVER COLLINS CANAL 1,303,396 - - - - - - 1,303,396 25940 SEAWALL REPAIR-FLEET MANAGEMENT 1,877,082 - - - - - - 1,877,082 27170 SEAWALL-BISCAYNE BAY ST END PH.II 185,714 - - - - - - 185,714 27510 NORMANDY ISLE-MARSEILLE LIGHTING 139,000 - - - - - - 139,000 27610 SEAWALL MUSS PARK REHABILITAION 1,161,000 - - - - - - 1,161,000 27990 MAURICE GIBB PARK FLOATING DOCK 177,000 - - - - - - 177,000 28300 SHANE WATERSPORT SEAWALL 134,000 - - - - - - 134,000 ATTACHMENT A CITY OF MIAMI BEACH rA AAA B ACE H FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY PROJECT PROJECT NAME Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 28410 SCOTT RAKOW PLAYGROUND 156,855 - - - - - - 156,855 28580 ESPANOLA WAY CONVERSION 56,000 - - - - - - 56,000 28850 MAURICE GIBB PARK REDESIGN 28,658 - - - - - - 28,658 28940 BAYSHORE NEIGH.CENTRAL-SOUTH 21,824 - - - - - 21,824 29550 CMB SKATEPARK 40,000 - - - - - 40,000 29620 ALLISON PARK REDESIGN 100,000 - - - - - 100,000 29730 NORMANDY ISLE NEIGH ROW PHASE II 129,914 - - - - - 129,914 29810 ALLEYWAY RESTORATION PH III - 100,000 100,000 - - - - 200,000 60011 IRRIGATION SYSTEM MACARTHUR CAUSEWAY - - - 28,000 - - - 28,000 60020 FLEET MGMT-GENERATOR TRNSFR SWITCH - - 100,000 - - - - 100,000 60122 SOUNDSCAPE PK LED LIGHTING - - - 75,000 - - - 75,000 60123 CRESPI PARK PLAYGROUND REPLACEMENT - - - 400,000 - 400,000 60137 PALM ISLAND TENNIS COURT LIGHTING 44,000 - - - - - - 44,000 60217 OCEAN DR LGBT DECORATIVE INTERSECT 100,000 - - - - - - 100,000 60223 POLO PARK PLAYGROUND REPLACEMENT - - - - - 450,000 - 450,000 60321 CITYWIDE PARKS COURT REPAIRS - - 80,000 100,000 100,000 100,000 100,000 480,000 60322 PARKS MAINT.FACILITY RENOVATIONS - .. - 300,000 - - - 300,000 60323 STILLWATER PLAYGROUND REPLACEMENT - - - - 570,000 - - 570,000 60421 CITYWIDE FITNESS COURSE REPLACEMENT - - 100,000 100,000 100,000 100,000 100,000 500,000 60523 FLAMINGO FOOTBALL STADIUM RAILINGS - - - - 100,000 - - 100,000 60920 HISTORIC CITY HALL-VFD REPLACEMENT - 200,000 - - - - - 200,000 61020 CITY HALL-GENERATOR REPLACEMENT - 600,000 - - - - - 600,000 61619 NORTH BEACH ROW LANDSCAPING 113,000 - - - - 113,000 61920 MAURICE GIBB SOIL REMEDIATION 896,000 - - - - - 896,000 62019 MIDDLE BEACH ROW LANDSCAPE 94,000 50,000 50,000 50,000 50,000 100,000 - 394,000 62619 ENERGY SUB-METERS IN MUN.BUILDINGS 68,000 - - - - - - - 68,000 62719 FLEET MGMT FACILITY REMEDIATION 111,000 - - - - - - 111,000 62819 LAKE PANCOAST MANGROVE PLANTER 30,000 - 1,450,000 - - - - 1,480,000 62919 OUTDOOR TRAINING FACILITY(FIRE) 100,000 - - - - - - 100,000 63019 BUILDOUT 1701 4TH FL FOR HOUSING 100,000 - - - - - - 100,000 63119 BELLE ISLE PARK BERMUDA GRASS 40,000 - - - - - - 40,000 63219 FLAMINGO PK IRRIGATION BASEBAL 86,000 - - - - - - 86,000 63319 PARK VIEW ISLAND ANNEX-DOG PARK 67,000 - - - - - - 67,000 63419 FLAMINGO PARK BASEBALL OUTFIELD NET 129,000 - - - - - - 129,000 63519 BUOY PARK REFORESTATION IMPROVEMENT 150,000 - - - - - - 150,000 63521 RESTORATIVE TREE WELL CITYWIDE - - 240,000 240,000 240,000 240,000 - 960,000 63619 NORMANDY SHORES SHADE STRUCTURE 44,000 - - - - - - 44,000 63719 1755 MERIDIAN-CHILLER REPLACEMENT 107,000 - - - - - - 107,000 ATTACHMENT A V i M B EAC CITY OF MIAMI BEACH /� A FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY PROJECT PROJECT NAME Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 63819 SSCC ROOT MITIGATION&FLOORING REP 65,000 - - - .. - - 65,000 63919 SMART CARD ACCESS SYSTEM-PHASE I 250,000 - - - - - - 250,000 64019 CITY HALL ENERGY EFFICIENT BUILDING 156,000 - - - - - - 156,000 64119 INDIAN CREEK LANDSCAPE&IRRIGATION 473,000 363,500 - - - - - - 836,500 64170 BISCAYNE POINTE ISLAND ENTRYWAY 200,000 - - - - - - 200,000 64418 THE FILLMORE 40-YR RECERTIFICATION 654,734 - - - - - - 6554,734 64420 CITY HALL RESTROOM RENOVATIONS - - 250,000 - - - - 250,000 64918 SMART LIGHTING MASTER PLAN 1,000,000 - - - - - - 1,000,000 65519 BRIDGE REPAIRS FY19 280,000 - - - - - - 280,000 65618 FLEET MANAGEMENT STAIRS RESTORATION - - 35,000 - - - - 35,000 65718 FLEET MANAGEMENT WAREHOUSE CEILING - - 30,000 - - - - 30,000 65818 FLEET MANAGEMENT FIRE SPRINKLER - - 250,000 - - - - 250,000 65918 FLEET MANAGEMENT LED LIGHTING - - 150,000 - - - - 150,000 66018 FLEET MANAGEMENT CONCRETE SPALLING - - 100,000 - - - - 100,000 66118 FLEET MANAGEMENT BAYS PAINTING - - 120,000 - - - - 120,000 66218 FLEET MANAGEMENT PARKING LOT - - 500,000 - - - - 500,000 66318 PARKS RESTROOM IMPROVEMNTS - - 260,000 200,000 - - - 460,000 66418 FLAMINGO POOL DECK&PUMP ROOM - - 250,000 - - - - 250,000 66518 SECURITY AUDIO SYSTEM FOR ALL POOLS - - 100,000 - - - - 100,000 67280 NEIGHBORHOOD BASKETBALL COURTS 137,000 - - - - - - 137,000 67300 SRYC-RECEPTION&BOWLING AREA 66,000 - - - - - - 66,000 67320 NEIGHBORHOOD TENNIS COURT RENOVATION 92,000 - - - - - - 92,000 67920 SMART BUILDING AUTOMATION SYSTEM - 100,000 - - - - - 100,000 68020 PARK RANGER HEADQUARTER RENOVATION - - - - 475,000 - - 475,000 68120 NORMANDY SHORES GOLF CLUB PUMPS - - 50,000 - - - - 50,000 69520 WATERWAY RESTORATION - 250,000 - - - - - 250,000 Fund Total: 23,220,750 3,227.257 10,474,093 4,704,100 8,028,500 1,390,000 15,475,000 66,519,700 303 GRANT FUNDED 23380 PALM&HIBISCUS ISLAND ENHANCEMENT 480,209480,209 Fund Total: 480,209 - - - - - - 480,209 304 CAPITAL RESERVE 21270 VENETIAN NEIGH.-ISLANDS (320) - - - (320) 22750 ALTOS DEL MAR PARK 384,823 - - - - - - 384,823 23180 BAYSHORE NEIGH.BID PACK D 639,000 - - - - - 639,000 23200 FLAMINGO PARK 295,000 - - - - - - 295,000 23300 FLAMINGO NEIGHBORHOOD-SOUTH 2,185,327 - - - - - 2,185,327 23360 WEST AVE/BAY RD NEIGH. 30,000 - - - - - 30,000 23380 PALM&HIBISCUS ISLAND ENHANCEMENT 3,288,290 - - - - - - 3,288,290 ATTACHMENT A CITY OF MIAMI BEACH AA , AAA BEACH FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY PROJECT PROJECT NAME Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 23418 POCKET PARK AT 20TH ST.&SUNSET DR 258,000 - - - - - - 258,000 25750 WEST AVE BOG OVER COLLINS CANAL 2,224,213 - - - - - - 2,224,213 25940 SEAWALL REPAIR-FLEET MANAGEMENT 688,549 - - - - - 688,549 27610 SEAWALL MUSS PARK REI-IABILITAION 21,423 - - - - - - 21,423 28580 ESPANOLA WAY CONVERSION 100,000 - - - - - - 100,000 28610 RUE VENDOME PUBLIC PLAZA 482,000 - - - - - - 482,000 28940 BAYSHORE NEIGH.CENTRAL-SOUTH 618,790 - - - - - - 618,790 29600 MUSS PARK FACILITY 245,000 - - - - - - 245,000 60217 OCEAN DR LGBT DECORATIVE INTERSECT 67,257 - - - - - - 67,257 64170 BISCAYNE POINTE ISLAND ENTRYWAY 137,109 - - - - - - 137,109 65218 PURDY AVE BOAT RAMP REPAIRS 180,033 - - - - - - 180,033 Fund Total: 11,844,494 11,844,494 305 SB QUALITY OF LIFE REST.TAX 1% 20001 ALTON ROAD FOUNTAIN AT 20TH STREET 279,000 - - - - - - 279,000 20011 WORLD WAR MEMORIAL - - 62,000 - - - - 62,000 20177 OCEAN DR.EXTENDED SIDEWALK PROJECT 235,000 - - - - - - 235,000 20187 LUMMUS PARK MUSCLE BEACH UPGRADE 232,000 - - - - - - 232,000 20223 LUMMUS PARK PLAYGROUND REPLACEMENT - - - - - - 450,000 450,000 20497 BASS MUSEUM PARK CAFE FF&E 100,000 - - - - - - 100,000 20597 WEST AVENUE PHASE II 67,781 - - - - - - 67,781 21119 BAYWALK 10TH TO 12TH STREET 310,000 - - - - - - 310,000 21218 5TH STREET FLYOVER LIGHTING 148,779 - - - - - - 148,779 22118 ENTERTAINMENT DISTRICT CAMERAS 170,000 - - - - - - 170,000 23200 FLAMINGO PARK 2,460,322 - - - - - - 2,460,322 25410 BEACHWALK II 500,000 - - - - - - 500,000 25750 WEST AVE BDG OVER COLLINS CANAL 334,000 - - - - - - 334,000 27360 RESTORATIVE TREEW ELL-PH 4-SOUTH BCH 690,000 - - - - - - 690,000 27800 STREET LIGHTING IMPROVEMENTS 201,988 - - - - - - 201,988 27970 BEACH SHOWER DRAINAGE SYSTEM 200,000 - - - - - - 200,000 27990 MAURICE GIBB PARK FLOATING DOCK 373,000 - - - - - - 373,000 28550 LIFEGUARD STAND REPLACEMENTS 1,798,800 - - - - - - 1,798,800 28560 COLLINS PK LIGHTING SOUND SYSTEM 236,000 - - - - - - 236,000 28580 ESPANOLA WAY CONVERSION 2,489,466 - - - - - - 2,489,466 29760 RESTORATIVE TREEW ELL-PH 3 683,911 - - - • - - 683,911 60022 FLAMINGO PARK NORTH-SOUTH WALKWAY - - - - 300,000 - - 300,000 60177 SOUTH BEACH PEDESTRIAN ZONES 300,000 - - - - - - 300,000 60720 BEACHWALK TREE WELLS 14-22 STREET) - 150,000 - - - - - 150,000 61419 BEACHFRONT RESTROOMS-RENOVATIONS 45,000 - - - - - - 45,000 ATTACHMENT A CITY OF MIAMI BEACH toA, / FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY PROJECT PROJECT NAME Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 61519 BEACH SHOWER DRAINAGE SYSTEM PH II 70,000 - - - - - - 70,000 62119 BASS MUSEUM-ROOF REPLACEMENT 397,000 - - - - - - 397,000 62219 FILLMORE-SIGNAGE REPLACEMENT 87,000 - - - - - - 87,000 62319 BOTANICAL GARDENS-ROOF REPAIRS 50,000 - - - - - - 50,000 62419 BASS MUSEUM-FREIGHT ELEVATOR 100,000 - - - - - - 100,000 62519 BEACHWALK DRAINAGE-S.POINTE-23 ST 220,000 - - - - - - 220,000 63080 BEACH RESTROOMS PAINT AND CONCRETE 15,275 - - - - - - 15,275 64918 SMART LIGHTING MASTER PLAN 464,012 200,000 200,000 200,000 200,000 200,000 200,000 1,664,012 65220 MIAMI CITY BALLET STUDIO FLOORING - 140,000 - - - - - 140,000 66022 SOUTH POINTE PARK SPLASH PAD - - - - 250,000 - - 250,000 66420 DADE BOULEVARD PEDESTRIAN PATHWAY - 225,000 - - - - - 225,000 66520 SOUTH BEACH ROW LANDSCAPE - 280,000 100,000 100,000 100,000 100,000 - 680,000 66620 FILLMORE-SITE LIGHTING PHASE II - - 50,000 - - - - 50,000 66920 S.P.PARK-FISHING PIER RAILING REP - - 500,000 - - - - 500,000 67120 SOUNDSCAPE PARK IMPROVEMENTS 28,000 - - - - - - 28,000 67360 BASS MUSEUM EMERGENCY GENERATOR 150,000 - - - - - - 150,000 68820 BEACH RESTROOMS EXHAUST SYSTEMS - 19,000 - - - - - 19,000 69020 SUPER BOWL ENHANCEMENTS LUMMUS PK - 250,000 - - - - - 250,000 69620 S.BOWL SIGNAGE/PAINTING/LIGHTING - 150,000 - - - - - 150,000 Fund Total: 13,436,334 1,414,000 912,000 300,000 850,000 300,000 650,000 17,862,334 306 MB QUALITY OF LIFE RESO.TX 1% 20108 MIAMI B.GOLF COURSE PRACTICE TEE 124,000 - - - - - - 124,000 RENOVATION 20110 28TH STREET OBELISK STABILIZATION 250,000 - - - - - - 250,000 20123 INDIAN BCH PK PLAYGROUND EXPANSION - 168,090 84,910 - - - - 253,000 20321 BEACHVIEW PK PLAYGROUND REPLACEMENT - - - 511,000 - - - 511,000 20330 MIDDLE BEACH REC CORRIDOR PH II 3,000,000 - - - - - - 3,000,000 20521 JULIA TURLE ENTRANCE SIGN - - 275,000 - - - - 275,000 20820 MB GOLF COURSE STORAGE TANK - 200,000 - - - - - 200,000 21019 SHORT-TERM 41ST ST RECOMMENDATIONS 100,000 - - - - - 100,000 21120 MIAMI BEACH GOLF CLUBHOUSE ROOF - 245,000 - - - - - 245,000 21420 MB GOLF COURSE IRRIGATION PUMP - 100,000 - - - - - 100,000 21620 SECURITY CAMERAS ON BEACHWALK 23-46 - 903,000 - - - - - 903,000 26270 COMMUNITY PARK(PAR 3)RENOVATIONS 490,000 - - - - - - 490,000 27800 STREET LIGHTING IMPROVEMENTS 493,600 - - - - - - 493,600 27970 BEACH SHOWER DRAINAGE SYSTEM 89,000 - - - - - - 89,000 28070 MIDDLE BEACH REC.CORRIDOR PH III 2,675,000 - - - - - - 2,675,000 28550 LIFEGUARD STAND REPLACEMENTS 540,000 - - - - - - 540,000 28850 MAURICE GIBB PARK REDESIGN 1,973,482 - - - - - - 1,973,482 ATTACHMENT A CITY OF MIAMI BEACH MIAMI BEACH FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY PROJECT PROJECT NAME Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 29600 MUSS PARK FACILITY 2,450,000 - - - - - - 2,450,000 29810 ALLEYWAY RESTORATION PH III - 60,000 60,000 - - - - 120,000 60121 BEACHVIEW FITNESS COURSE REPLACEMENT - - - 80,000 - - - 80,000 60367 INDIAN BEACH PLAYGROUND REPLACEMENT 229,000 - - - - - - 229,000 61419 BEACHFRONT RESTROOMS-RENOVATIONS 26,000 - - - - - - 26,000 61519 BEACH SHOWER DRAINAGE SYSTEM PH II 105,000 - - • - - - 105,000 61719 41ST STREET BRIDGES REPAIR 480,000 - 480,000 - - - - 960,000 61819 BEACHWALK DRAINAGE-24 ST TO 46 ST 100,000 - - - - - - 100,000 61919 41ST STREET FOUNTAIN RESTORATION 82,000 - - - - - - 82,000 62019 MIDDLE BEACH ROW LANDSCAPE 32,000 50,000 50,000 50,000 50,000 50,000 - 282,000 64118 BGC GOLF CART STAGING AREA 65,000 - - - - - - 65,000 64119 INDIAN CREEK LANDSCAPE&IRRIGATION - 363,500 - - - - - 363,500 64918 SMART LIGHTING MASTER PLAN - 200,000 200,000 200,000 200,000 200,000 200,000 1,200,000 65218 PURDY AVE BOAT RAMP REPAIRS 200,000 - - - - - - 200,000 66320 MB GOLF CLUB DRIVING RANGE LIGHTING - - 80,000 - - - - 80,000 67370 COLLINS AVE BOARDWALK REPLACEMENT 150,000 - - - - - - 150,000 68820 BEACH RESTROOMS EXHAUST SYSTEMS - 9,000 - - - - - 9,000 Fund Total: 13,654,082 2,298,590 1,229,910 841,000 250,000 250,000 200,000 18:723,582 307 NB QUAL OF LIFE RESORT TAX 1% 20023 ALLISON PARK PLAYGROUND REPLACEMENT - - - - - - 625,000 625,000 20141 7300 DICKENS AVE L/SCAPE-IRRIGATION - - 37,000 - - - - 37,000 20257 MIAMI BEACH TENNIS CENTER PROSHOP 627,000 - - - - - - 627,000 20421 NORTH SHORE BANDSHELL REAR CANOPY - - 310,000 - - - - 310,000 20627 NORTH SHORE BANDSHELL CANOPY 668,000 - - - - - - 668,000 20920 NORTH SHORE BANDSHELL REAR SEATING - 188,000 - - - - - 188,000 22150 72ND ST PARK AND PARKING STRUCTURE 346,000 - - - - - - 346,000 22218 NORTH BEACH YARD 553,467 - - - - - - 553,467 22750 ALTOS DEL MAR PARK 1,350,000 - - - - - - 1,350,000 25380 BAND SHELL MASTER PLAN 1,133,372 - - - - - - 1,133,372 26500 KAYAK LAUNCH DOCKS 713,080 - - - - - 713,080 27800 STREET LIGHTING IMPROVEMENTS 629,717 - - - - - - 629,717 27950 NORTH BEACH OCEANSIDE PARK 200,000 - - - - - - 200,000 27970 BEACH SHOWER DRAINAGE SYSTEM 177,000 - - - - - - 177,000 28550 LIFEGUARD STAND REPLACEMENTS 540,000 - - - - - - 540,000 28600 NORTH SHORE PARK RESTROOMS 1,001,000 - - - - - - 1,001,000 28610 RUE VENDOME PUBLIC PLAZA 1,754,000 - - - - - - 1,754,000 28630 BONITA DRIVE STREET END IMPROVEMENT 135,000 - - - - - - 135,000 28640 NORTH BEACH STREETSCAPE PILOT PROJ 330,000 - - - - - - 330,000 ATTACHMENT A A A CITY OF MIAMI BEACH EAH FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY PROJECT PROJECT NAME Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 29550 CMB SKATEPARK 150,280 - - - - - - 150,280 29620 ALLISON PARK REDESIGN 1,432,000 - - - - - - 1,432,000 29810 ALLEYWAY RESTORATION PH III - 60,000 60,000 - - - - 120,000 60237 COLLINS/HARDING ALLEY RESTORATION 100,000 - - - - - - 100,000 61219 N.SHORE TENNIS FACILITY FENCE 47,000 - - - - - - 47,000 61319 N.SHORE BANDSHELL PLUMBING REPAIRS 30,000 - - - - - - 30,000 61419 BEACHFRONT RESTROOMS-RENOVATIONS 87,000 - - - - - - 87,000 61519 BEACH SHOWER DRAINAGE SYSTEM PH II 125,000 - - - - - - 125,000 61619 NORTH BEACH ROW LANDSCAPING 57,000 100,000 100,000 100,000 100,000 100,000 - 557,000 63318 NORMANDY ISLE PARK POOL RENOVATIONS 375,000 - - - - - - 375,000 64160 PAINTING&LIGHTING OF BRIDGES 1,160,000 425,000 910,000 - - - - 2,495,000 64190 ENTRANCE SIGNS TO NORTH BEACH 300,000 449,000 - - - - - 749,000 64918 SMART LIGHTING MASTER PLAN 196,883 200,000 200,000 200,000 200,000 200,000 200,000 1,396,883 65620 NORTH BEACH OCEANSIDE PK SECURITY 225,000 - - - - - - 225,000 67140 81ST ST PEDESTRIAN BRIDGE 180,000 - - - - - - 180,000 68820 BEACH RESTROOMS EXHAUST SYSTEMS - 7,000 - - - - - 7,000 Fund Total: 14,622,799 1,429,000 1,617,000 300,000 300,000 300,000 825,000 19,393,799 308 RESORT TAX REV.BONDS 2015 28160 CONVENTION CENTER RENOVATION 216,632,193 - - - - - - 216,632,193 Fund Total: 216,632,193 - - - - - - " ' 216,632,193 309 RDA SERIES 2015A 24550 BASS MUSEUM SPACE EXPANSION 3,750,000 - - - - - - 3,750,000 28160 CONVENTION CENTER RENOVATION 268,602,420 - - - - - - 268,602,420 28170 CONVENTION CENTER PARK 7,750,000 - - - - - - 7,750,000 28180 CONVENTION CENTER-CARL FISHER 3,647,580 - - - - - - 3,647,580 29310 CONVENTION CENTER LINCOLN RD CONNEC 10,000,000 - - - - - - • 10,000,000 29320 17TH STREET NORTH IMPROVEMENTS 2.000,000 - . - - - - 2.000,000 Fund Total: 295,750,000 - - - - - - 295,750,000 320 GENERAL CAPITAL -MDC ILA 20597 WEST AVENUE PHASE Il 7,390,575 - - - - - - 7,390,575 23000 SUNSET HARBOUR PUMPSTATION UPGRADES 736 0R - - - - - - 738,081 Fund Total: 8,128,656 - - - - - - 8,128,656 350 PALM ISLAND UNDERGROUND UTILIT 23380 PALM&HIBISCUS ISLAND ENHANCEMENT 1,337,090 - - - - - - 1,337,096 Fund Total: 1,337,096 - - - - - - 1,337,096 351 REALLOC.FUNDS-OTHER CAP.PROJ 20137 MUSS PARK PLAYGROUND&IMPROVEMENTS 345,000 - - - - - 345,000 20297 EXPANSION OF CITY WIDE SURVEILLANCE 180,000 - - - - - - 180,000 ATTACHMENT A CITY OF MIAMI BEACH IA - BEACH FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY PROJECT PROJECT NAME Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 25750 WEST AVE BDG OVER COLLINS CANAL 59,952 - - - - - - 59,952 Fund Total 504,952 i 365 CITY CENTER RDA CAP FUND 23270 CITY CENTER COMMERCIAL DISTRICT BPS 13,539,610 - - - - - - 13,539,610 23300 FLAMINGO NEIGHBORHOOD-SOUTH 18,932 - - - - - - 18,932 23360 WEST AVE/BAY RD NEIGH. 750,000 - - - - - - 750,000 24550 BASS MUSEUM SPACE EXPANSION 3,750,000 - - - - - - 3,750,000 25650 CITYWIDE CURB RAMP INSTALLATION 1,500 - - - - - - 1,500 25980 BASS MUSEUM GENERATOR 117,816 - - - - - - 117,816 26010 BASS MUSEUM HYDRAULIC ELEVATOR 66,127 - - - - - - 66,127 27070 BEACHWALK LIGHTING RETRO 665,625 - - - - - - 665,625 27600 SEAWALL-BOTANICAL GARDEN 1,208,662 - - - - - - 1,208,662 27650 ALUMINUM STREETLIGHTING POLE REPLACEMENT 168,060 - - - - - - 168,060 27780 MIAMI CITY BALLET WINDOWS 126,799 - - - - - - 126,799 28010 COLLINS PARK PARKING GARAGE 25,521,271 - 25,521,271 28160 CONVENTION CENTER RENOVATION 6,914,221 - - - - - - 6,914,221 28180 CONVENTION CENTER-CARL FISHER 265,320 - - - - - - 265,320 29300 LINCOLN RD LENOX-COLLINS W/SIDE STR 20,000,000 - - - - - - 20,000,000 29500 COLLINS CANAL ENHANCEMENT PROJECT 2,999,999 - - - - - - 2,999,999 29530 COLLINS PARK ANCILLARY IMPROVEMENTS 4,000,000 - - - - - - 4,000,000 29880 LINCOLN RD MALL ADA PEDESTRIAN 87,500 - - - - - - 87,500 65118 BASS MUSEUM-FIRE PUMP REPLACEMENT 72,000 - - - - - - 72,000 Fund Total: 80,273,442 - - - - - - 80,273,442 366 PARKS AND REC.BEAUTIF.FUNDS 20577 BELLE ISLE PARK PLAYGROUND 230,000 - - - - - 230,000 21270 VENETIAN NEIGH.-ISLANDS 23,355 - - - - - - 23,355 23000 SUNSET HARBOUR PUMPSTATION UPGRADES 440,800 - - - - - - 440,800 23418 POCKET PARK AT 20TH ST.&SUNSET DR 155,658 - - - - - - 155,658 28850 MAURICE GIBB PARK REDESIGN 626,542 - - - - - - 626,542 61920 MAURICE GIBB SOIL REMEDIATION 196,000 - - - - - 196,000 67420 FLAMINGO PARK POOL PLAYGROUND 65,383 - - - - - 65,383 Fund Total: 1,737,738 - - - - - - 1,737,738 369 GULF BREEZE BOND FUND-OTHER 62818 FIRE STATION 2 GARAGE DOOR 15.464 - - - - - 15,484 Fund Total: 15,484 - - - - - - 15,484 370 RCP-1996 15M GO BOND 20577 BELLE ISLE PARK PLAYGROUND 5,566 - - - - - - 5,566 22750 ALTOS DEL MAR PARK 315,849 - - - - - - 315,849 J� /iATTACHMENT A 1 'If t I�M B E \ CITY OF MIAMI BEACH FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY PROJECT PROJECT NAME Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 23200 FLAMINGO PARK 336,423 - - - - 336,423 67420 FLAMINGO PARK POOL PLAYGROUND 104,175 - - - - - - 104,175 Fund Total: 762,013 - 762,013: 373 99 GO BONDS-NEIGHBORHOOD IMPRO 22050 BAYSHORE NEIGH.BID PACK A (200) - - - - - (200) 23180 BAYSHORE NEIGH.BID PACK D 3,828 - - - - - - 3,828 23220 NORTH SHORE NEIGH.IMPROVEMENTS 427,541 - - - - - - 427,541 23240 LA GORCE NEIGHBORHOOD IMPROVEMENTS 64,203 - - - - - - 64,203 23300 FLAMINGO NEIGHBORHOOD-SOUTH 164,785 - - - - - - 164,785 23360 WEST AVE/BAY RD NEIGH. 197,991 - - - - - - 197,991 Fund Total 858,148 - • - - 858,148' 374 GULF BREEZE 23200 FLAMINGO PARK 137,080 - - - - - - 137,080 Fund Total: 137,080 - - 137.080 376 99 GO BONDS-NEIGHBORHOOD IMP 21270 VENETIAN NEIGH.-ISLANDS 2,930,534 - - - - - - 2,930,534 22050 BAYSHORE NEIGH.BID PACK A 417,634 - - - - - - 417,634 23220 NORTH SHORE NEIGH.IMPROVEMENTS 245,045 - - - - - - 245,045 23240 LA GORGE NEIGHBORHOOD IMPROVEMENTS 61 - - - - - - 61 23360 WEST AVE/BAY RD NEIGH. 13,527 - - - - - - 13,527 23380 PALM&HIBISCUS ISLAND ENHANCEMENT 47,808 - - - - - - 47,808 Fund Total: 3,654,609 3,654,609 377 99 GO BONDS-PARKS&BEACHES 22750 ALTOS DEL MAR PARK 109,643 - - - - - - 109,643 23200 FLAMINGO PARK 203,400 - - - - - - 203,400 Fund Total: 313,043 313,043 378 99 GO BONDS FIRE SAFETY(B) 21318 F-550 MOBILE AIR TRUCK UNIT 271,000 - - - - - - 271,000 62818 FIRE STATION 2 GARAGE DOOR 40,859 - 40,859 Fund Total: 311,859 - 311,859.E 379 SOUTH POINTE RDA 20587 1ST STREET-ALTON RD TO WASHINGTON 2,200,000 2,469,616 - - - - - 4,669,616 23018 SOUTH POINTE PARK LIGHTING 585,000 - - - - - - 585,000 23300 FLAMINGO NEIGHBORHOOD-SOUTH 261,194 - - - - - - 261,194 25410 BEACHWALK II 2,800,819 - - - - - - 2,800,819 27370 541N DIAMETER REDUNDANT SEWER FORCE 990,000 - - - - - - 990,000 29430 SOUTH POINTE PARK REMEDIATION 100,000 - - - - - - 100,000 29860 FLAMINGO 10G-6 ST.ROW IMPROVEMENTS 2,501,399 (2,469,616) - - - - - 31,783 fATTACHMENT A Y t I AMI BEA ` CITY OF MIAMI BEACH f� FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY PROJECT PROJECT NAME Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 60177 SOUTH BEACH PEDESTRIAN ZONES - 650,000 - - - - - 650,000 61117 RESTORATIVE TREE WELL TREATMENT 145,000 - - - - 145,000 Fund Total: 9,583,412 650,000 - - 10,233,412 382 2003 G.O.BONDS-FIRE SAFETY 60057 FIRE STATION 3 EMERGENCY GENERATOR 100,000 - - - - - - 100,000 60077 FIRE STATION 2 ALARM SYSTEM 89,000 - - - - - 89,000 61520 FIRE STATION 2 KITCHEN REPLACEMENT 35,000 - - - - - - 35,000 62818 FIRE STATION 2 GARAGE DOOR 122,619 - - - - 122,619 67220 FIRE STATION 3 EMERGENCY GENERATOR 66,045 - - - - - - 66,045 Fund Total: 412.664 - - - - - - 412,664 383 2003 GO BONDS-PARKS&BEACHES • 20190 NORMANDY SHORES PK FITNESS CIRCUIT 112,000 - - - - - - 112,000 22750 ALTOS DEL MAR PARK 2,790,357 - - - - 2,790,357 23200 FLAMINGO PARK 4,648,453 - - - - - 4,648,453 23418 POCKET PARK AT 20TH ST.&SUNSET DR 521,342 - - - - - 521,342 24790 PARK VIEW ISLAND 395,676 - - - - - - 395,676 63218 MID BEACH PARK RESTROOM RESTORATION 80,000 - - - - - - 80,000 67420 FLAMINGO PARK POOL PLAYGROUND 76,026 - - - - - - 76,026 Fund Total: 8,623,854 - - - - - - 8,623,854 383 BONDS 20577 BELLE ISLE PARK PLAYGROUND 46,349 - - - - - - 46,349 Fund Total: 46,349 - - - - - - 46,349 384 2003 GO BONDS-NEIGHBORHOODS 20327 2 WAY CONVERSION 42ND ST.SHERIDAN 510,000 - - - - - - 510,000 20597 WEST AVENUE PHASE II 2,420,736 - - - - - - 2,420,736 20607 11TH STREET-FLAMINGO NEIGHBORHOOD 1,511,349 - - - - - - 1,511,349 21240 CHEROKEE AVE SOUTH END SEAWALL 140,000 - - - - - - 140,000 21270 VENETIAN NEIGH.-ISLANDS 3,669,649 - - - - - - 3,669,649 22050 BAYSHORE NEIGH.BID PACK A 3,106,901 - - - - - - - 3,106,901 23180 BAYSHORE NEIGH.BID PACK D 300,344 - - - - - - 300,344 23220 NORTH SHORE NEIGH.IMPROVEMENTS 668,191 - - - - - 668,191 23240 LA GORCE NEIGHBORHOOD IMPROVEMENTS 372,930 - - - - - - 372,930 23300 FLAMINGO NEIGHBORHOOD-SOUTH 56,353 - - - - - - 56,353 23360 WEST AVE/BAY RD NEIGH. 3,878,208 - - - - - 3,878,208 23380 PALM&HIBISCUS ISLAND ENHANCEMENT 567,822 - - - - 567,822 25750 WEST AVE BDG OVER COLLINS CANAL 65,738 - - - - - - 65,738 28940 BAYSHORE NEIGH.CENTRAL-SOUTH 4,170,522 - - - - - - 4,170,522 29500 COLLINS CANAL ENHANCEMENT PROJECT 1,428,192 - - - - - - 1,428,192 ATTACHMENT A V/t I A BEACH 4✓ CITY OF MIAMI BEACH IFY 2020-2024 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY PROJECT PROJECT NAME Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 29730 NORMANDY ISLE NEIGH ROW PHASE II 225,543 - - - - - - 225,543 60247 42ND ST.GREEN BICLYCLE LANES PAINT 150,000 - - - - - - 150,000 60257 BAY DRIVE NEIGHBORHOOD GREENWAY 100,000 - - - - - - 100,000 Fund Total: 23,342,478 - - - - 23,342,478 388 MDC CDT INTERLOCAL-CDT/RTX 20330 MIDDLE BEACH REC CORRIDOR PH II 9,065,517 - - - - - - 9,065,517 20597 WEST AVENUE PHASE II 501,093 - - - - - - 501,093 23200 FLAMINGO PARK 5,292,273 - - - - - 5,292,273 25410 BEACHWALK II 799,400 - - - - - - 799,400 26270 COMMUNITY PARK(PAR 3)RENOVATIONS 4,558,090 - - - - - - 4,558,090 29130 SOUTH POINTE MISCELANEOUS IMPR. 338,041 - - - - - - 338,041 29430 SOUTH POINTE PARK REMEDIATION 800,000 - - - - - 800,000 66718 BEACH STORAGE AREA ENCLOSURE - 170,000 - - - - - 170,000 Fund Total: 21,354,414 170,000 = - - - 21,524,414: 389 SOUTH POINTE CAPITAL 20567 MAURICE GIBB PARK SEAWALL 321,164 - - - - - - 321,164 20587 1ST STREET-ALTON RD TO WASHINGTON 241,799 4,500,000 - - - - 4,741,799 20607 11TH STREET-FLAMINGO NEIGHBORHOOD 552,777 - - - - - - 552,777 21220 INDIAN CREEK STREET DRAINAGE IMP. 2,500,368 - - - - - - 2,500,368 23000 SUNSET HARBOUR PUMPSTATION UPGRADES 551,300 - - - - - - 551,300 23270 CITY CENTER COMMERCIAL DISTRICT BPB 3,381,241 - - - - - 3,381,241 23360 WEST AVE/BAY RD NEIGH. 4,900,000 - - - - - - 4,900,000 23618 LENOX COURT 8 JEFFERSON AVE SEAWALL 300,000 - - - - - - 300,000 25410 BEACHWALK II 133,214 - - - - - - 133,214 25650 CITYWIDE CURB RAMP INSTALLATION 10,500 - - - - - - 10,500 26340 PENRODS AT 1 OCEAN DR.PARKING LOT 2,798,310 - - - - - - 2,798,310 27370 541N DIAMETER REDUNDANT SEWER FORCE 6,600,000 - - - - - - 6,600,000 27540 SOUTH POINTE PARK IMPROVEMENTS 184,000 - - - - - 184,000 28550 LIFEGUARD STAND REPLACEMENTS 300,000 - - - - - - 300,000 28730 SEAWALL-LINCOLN COURT 548,000 - - - - - - 548,000 28740 SEAWALL-HOLOCAUST MEMORIAL 100,000 - - - - - - 100,000 28770 COLLINS CANAL CONVENTION CENTER 97,150 - - - - - - 97,150 28780 SEAWALL DADE BLVD-WASHINGTON AVE 1,625,000 - - - - - - 1,625,000 28790 CONVENTION CENTER DR TO WASHINGTON 1,800,000 - - - - - - 1,800,000 28820 INDIAN BEACH PARK SEAWALL 715,000 - - - - - - 715,000 28830 NORMANDY SHORES PARK SEAWALL 226,000 - - - - - - 226,000 29130 SOUTH POINTE MISCELANEOUS IMPR. 61,959 - - - - - - 61,959 29430 SOUTH POINTE PARK REMEDIATION 8,026,881 - - - - - - 8,026,881 ATTACHMENT A CITY OF MIAMI BEACH /\/\ FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY . PROJECT PROJECT NAME Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 29560 BRITTANY BAY PARK SEAWALL 1,109,000 - - - - - - 1,109,000 29860 FLAMINGO 10G-6 ST.ROW IMPROVEMENTS 4,500,000 (4,500,000) - - - - - - 61117 RESTORATIVE TREE WELL TREATMENT 147,000 - - - - - - 147,000 65219 SOUTH POINTE PARK HVAC REPLACEMENT 50,000 - - - - - 50,000 66618 SOUTH POINTE PK-FIRE ALARM RENEWAL - 35,000 - - - - 35,000 Fund Total: 41,780,663 35,000 - - - - - 41,815,663 390 MIAMI-DADE COUNTY BOND 23200 FLAMINGO PARK 3,099,000 - - - - - - 3.099,DDr; 25380 BAND SHELL MASTER PLAN 1,500,000 - - - - - 1,500,000 Fund Total: 4,599,000 - - - - - - 4,599,000 391 2019 GO BONDS—PARKS 25019 GO#1:72ND ST.RECREATION CENTER 10,800,000 - - - - - - 10,800,000 25119 GO#2:COLLINS PARK 640,000 - - - - - 640,000 25219 GO#3:CRESPI PARK 211,000 - - - - - - 211,000 25319 GO#4:FAIRWAY PARK 260,000 - - - - - - 260,000 25419 GO#5:FLAMINGO PARK&YOUTH CENTER 15,400,000 - - - - - - 15,400,000 25719 GO#8:LUMMUS PARK 4,737,000 - - - - - - 4,737,000 25819 GO#9:M.S.D.PARK 682,000 - - - - - - 682,000 25919 GO#10:MAURICE GIBB PARK 3,300,000 - - - - - - 3,300,000 26119 GO#12:NOBE OCEANSIDE PARK BEACHWLK 2,000,000 - - - - - - 2,000,000 26219 GO#13:N.SHORE PARK&YOUTH CENTER 4,930,000 - - .. - - 4,930,000 26319 GO#15:PAR 3/COMMUNITY PARK 15,700,000 - - - - - - 15,700,000 26419 GO#17:POLO PARK 500,000 - - - - - - 500,000 26519 GO#18:SCOTT RAKOW YOUTH CENTER 4,448,000 - - - - - - 4,448,000 26619 GO#19:SOUNDSCAPE PARK 4,500,000 - - - - - - 4,500,000 26719 GO#23:BAYWLK PEDESTRIAN BRIDGE 10,000,000 - - - - - - 10,000,000 26819 GO#24:MIDDLE BEACH BEACHWLK 4,500,000 - - - - - 4,500,000 27119 GO#29:WEST LOTS 1,000,000 - - - - - - 1,000,000 28919 GO#26:ROOFS FOR CULTURAL FACIL. 2,980,000 - - - - - 2,980,000 67819 GO#21:STILLWATER PARK 145,000 - - - - - - 145,000 Fund Total: 86,733,000 - - - - - - 86,733,000 392 2019 GO BONDS- PUBLIC SAFETY 22819 GO#57:CAMERAS-ENTERTAINMENT DIST. 1,490,000 - - - - - 1,490,000 23119 GO#49:PUBLIC SAFETY RADIO SYSTEM 10,000,000 - - - - - 10,000,000 28319 GO#45:FIRE STATION#1 7,000,000 - - - - - - 7,000,000 28519 GO#47:LICENSE PLATE READERS 1,950,000 - - - - - - 1,950,000 28719 GO#53:SECURITY FOR PUBLIC SPACES 2,000,000 - - - - - - 2,000,000 28819 GO#54:MARINE PATROL FACILITY 2,700,000 - - - - - - 2,700,000 ATTACHMENT A EA CITY OF MIAMI BEACH , \ to 1s , H FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY PROJECT PROJECT NAME Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 68519 GO#48:POLICE HO FACILITY 4,000,000 - - - - - - 4,000,000 68819 GO#50:CAMERAS-BUSINESS DIST. 825,000 - - - - - - 825,000 68919 GO#52:LED LIGHTING IN PARKS 1,041,000 - - - - - - 1,041,000 69019 GO#55:STREET LIGHTING IMPROVEMENTS 5,000,000 - - - - - - 5,000,000 69119 GO#56:CAMERAS-BEACHWLK 400,000 - - - - 400,000 Fund Total: 36,406,000 - - - - - - 36,406,000 393 2019 GO BONDS-NEIGHBORHOODS 24619 GO#37:SIDEWALK IMPROVEMENTS 3,500,000 - - - - - - 3,500,000 27419 GO#32:PALM&HIBISCUS NEIGHBORHOOD 1,000,000 - - - - - - 1,000,000 27819 GO#38:STREET PAVEMENT 7,500,000 - - - - - - 7,500,000 27919 GO#39:SEAWALLS&SHORELINES 8,000,000 - - - - - 8,000,000 28019 GO#40:41ST ST.CORRIDOR 1,500,000 - - - - - - 1,500,000 68219 GO#33:STREET TREE MASTER PLAN 2,500,000 - - - - - 2,500,000 68419 GO#42:TRAFFIC CALMING 1,500,000 - - - - - 1,500,000 68619 GO#43:BIKE LANES&SHARED PATHS 2,500,000 - - - - - - 2,500,000 Fund Total: 28,000,000 - - 28,000,000 418 W&S CAP PROJ FNDED BY OPER FDS 20607 11TH STREET-FLAMINGO NEIGHBORHOOD 40,468 - - - - - - 40,468 23000 SUNSET HARBOUR PUMPSTATION UPGRADES 1,013,016 - - - - - - 1,013,016 23360 WEST AVE/BAY RD NEIGH. 376,706 - - - - - - 376,706 27370 54IN DIAMETER REDUNDANT SEWER FORCE 2,370,395 - - - - .. - 2,370,395 28120 WATER PUMP STATIONS IMPROVEMENTS - 1,000,000 - - - - 1,000,000 28220 WASTEWATER MANHOLE REHABILITATION - 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 - 7,500,000 28320 SEWER PUMP STATION ODOR CONTROL - 850,600 - - - - - 850,600 28420 SWR PUMP STATION#18 IMPROVEMENTS - 700,000 - - - - - 700,000 60419 DERM&EPA CONSENT DECREE 400,000 500,000 500,000 500,000 500,000 500,000 - 2,900,000 63918 PUBLIC WORKS FACILITY RENOVATION 106,890 - - - - - - 106,890 66818 WATER STATION ROOF REPLACEMENT - 30,000 - - - - - 30,000 Fund Total: 4,307,475 4,580,600 2,000,000 2,000,000 2,000,000 2,000,000 16,888,075 419 2017 WATER&SEWER BONDS 20527 FOOT UTILITES RELOCATION 677,529 - - - - - - 677,529 20597 WEST AVENUE PHASE II 18,333,671 - - - - - - 18,333,671 20607 11TH STREET-FLAMINGO NEIGHBORHOOD 2,495,457 - - - - - - 2,495,457 20619 WASTE WATER STATIONS REHABILITATION - 4,500,000 - - - - - 4,500,000 20719 SCADA AND PLC SYSTEMS 1,512,500 1,625,250 - - - - - 3,137,750 21270 VENETIAN NEIGH.-ISLANDS 597,022 - - - - - - 597,022 23000 SUNSET HARBOUR PUMPSTATION UPGRADES 1,730,614 (1,190,983) - - - - - 539,631 23220 NORTH SHORE NEIGH.IMPROVEMENTS 138,427 - - - - - - 138,427 ATTACHMENT A tI f/""1,1 t M BEACH CITY OF MIAMI BEACH ft"I FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY PROJECT PROJECT NAME Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 23240 LA GORGE NEIGHBORHOOD IMPROVEMENTS 297,347 - - - - - - 297,347 23360 WEST AVE/BAY RD NEIGH. 110,000 - - - - - - 110,000 23380 PALM&HIBISCUS ISLAND ENHANCEMENT 3,963,099 - - - - - - 3,963,099 27370 54IN DIAMETER REDUNDANT SEWER FORCE 3,997,327 - - - - - 3,997,327 28520 WATER&WASTEWATER MAINS AND REHAB - 17,000,000 - - - - - 17,000,000 28940 BAYSHORE NEIGH.CENTRAL-SOUTH 3,616,516 - - - - - 3,616,516 60319 WATER METER REPLACEMENT PROGRAM 2,000,000 - 5,000,000 - - - - 7,000,000 Fund Total: 39,469,509 21,934,267 5,000,000' 66,403,776 420 W&S GBL SERIES 2010 2009-27243 21270 VENETIAN NEIGH.-ISLANDS 2,766,100 - - - - - - 2,766,100 22050 BAYSHORE NEIGH.BID PACK A 3,895,513 - - - - - - 3,895,513 23000 SUNSET HARBOUR PUMPSTATION UPGRADES 2,500,062 - - - - - - 2,500,062 23180 BAYSHORE NEIGH.BID PACK D 2,850,793 - - - - - - 2,850,793 23220 NORTH SHORE NEIGH.IMPROVEMENTS 2,368,323 - - - - - - 2,368,323 23360 WEST AVE/BAY RD NEIGH. 1,632,360 - - - - - - 1,632,360 23380 PALM&HIBISCUS ISLAND ENHANCEMENT 2,547,712 - - - - - - 2,547,712 27370 54IN DIAMETER REDUNDANT SEWER FORCE 566 - - - - - 566 Fund Total: 18,561,429 - - - - - - 18,561,429 422 WATER AND SEWER IMPACT FEES 23180 BAYSHORE NEIGH.BID PACK D 97.000 - - - - - 97,000 61518 PUMP STATION 28 FUEL STORAGE TANK 108,623 - - - 108,623 61618 PUMP STATION 29 FUEL STORAGE TANK 89,160 - - - - - - 89,160 Fund Total: 294,783 - - - - - - 294,783 423 GULF BREEZE 2006 21270 VENETIAN NEIGH.-ISLANDS 1,134,463 - - - - - - 1,134,463 22050 BAYSHORE NEIGH.BID PACK A 765,052 - - - - - - 765,052 23240 LA GORGE NEIGHBORHOOD IMPROVEMENTS 56,000 - - - - 56,000 23380 PALM&HIBISCUS ISLAND ENHANCEMENT 2,828,927 - - - - - 2,828,927 28940 BAYSHORE NEIGH.CENTRAL-SOUTH 106,792 106,792 Fund Total: 4,891,234 - - - - - - 4,891,234 424 WATER&SEWER BONDS 2000S 21270 VENETIAN NEIGH.-ISLANDS 3,659,741 - - - - 3,659,741 22050 BAYSHORE NEIGH.BID PACK A 2,893,609 - - - - - - . 2,893,609 23180 BAYSHORE NEIGH.BID PACK D 777,897 - - - - - 777,897 23220 NORTH SHORE NEIGH.IMPROVEMENTS 2,024,350 - - - - - - 2,024,350 23240 LA GORGE NEIGHBORHOOD IMPROVEMENTS 524,662 - - - - - - 524,662 23300 FLAMINGO NEIGHBORHOOD-SOUTH 1,211,126 - - - - 1,211,126 23360 WEST AVE/BAY RD NEIGH. 1,063,111 - - - - - - 1,063,111 ATTACHMENT A AA I AM( BEACH CITY OF MIAMI BEACH #t••. FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY PROJECT PROJECT NAME Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 23380 PALM&HIBISCUS ISLAND ENHANCEMENT 1,222,509 - - - - - - 1,222,509 27370 541N DIAMETER REDUNDANT SEWER FORCE 78,434 - - - - - - 78,434 28940 BAYSHORE NEIGH.CENTRAL-SOUTH 1,715 - - - - - - 1,715 Fund Total: 13,457,154 - - - 13,457,154 425 WATER AND SEWER ENTERPRISE FUN 21270 VENETIAN NEIGH.-ISLANDS 1,529,777 - - - - - - 1,529,777 22050 BAYSHORE NEIGH.BID PACK A 50,770 - - - - - - 50,770 23180 BAYSHORE NEIGH.BID PACK D 358,785 - - - - - - 358,785 23360 WEST AVE/BAY RD NEIGH. 106,783 - - - - - - 106,783 23380 PALM&HIBISCUS ISLAND ENHANCEMENT 503,278 - - - - - - 503,278 28940 BAYSHORE NEIGH.CENTRAL-SOUTH 309,433 - - - - - - 309,433 64220 PUBLIC WORKS FACILITY EXTERIOR 84,914 - - - - - - 84,914 69220 PUBLIC WORKS FACILITY GENERATOR 130,209 - - - - - - 130,209 Fund Total• 3,073,949 - - - 3,073,949 427 STORMWATER ENTERPRISE FUND 21270 VENETIAN NEIGH.-ISLANDS 2,600,270 - - - - - - 2,600,270 23000 SUNSET HARBOUR PUMPSTATION UPGRADES 1,974,840 - - - - - - 1,974,840 23380 PALM&HIBISCUS ISLAND ENHANCEMENT 449,272 - - - - - - 449,272 27170 SEAWALL-BISCAYNE BAY ST END PH.II 1,508,344 - - - - - - 1,508,344 28940 BAYSHORE NEIGH.CENTRAL-SOUTH 75,486 - - - - - - 75,486 29730 NORMANDY ISLE NEIGH ROW PHASE II 11,828 - - - - - - 11,828 69220 PUBLIC WORKS FACILITY GENERATOR 65.105 - - - - - - 65,105 Fund Total: 6,685,145 - - - - - - 6,685,145 428 STORMWATER BONDS 2000S 21270 VENETIAN NEIGH.-ISLANDS 4,353,561 - - - - - 4,353,561 22050 BAYSHORE NEIGH.BID PACK A 1,549,281 - - - - - - 1,549,281 23180 BAYSHORE NEIGH.BID PACK D 119,601 - - - - - - 119,601 23240 LA GORCE NEIGHBORHOOD IMPROVEMENTS 730,899 - - - - - - 730,899 23270 CITY CENTER COMMERCIAL DISTRICT BPB (28,330) - - - - - - (28,330) 23300 FLAMINGO NEIGHBORHOOD-SOUTH 3,375,123 - - - - - - 3,375,123 23360 WEST AVE/BAY RD NEIGH. 1,260,981 - - - - - - 1,260,981 23380 PALM&HIBISCUS ISLAND ENHANCEMENT 427,465 - - - - - 427,465 Fund Total: 11,788,581 - - - - - - 11,788,581 429 2017 STORMWATER BONDS 20587 1ST STREET-ALTON RD TO WASHINGTON 358,201 17,101,125 - - - - - 17,459,326 20597 WEST AVENUE PHASE II 47,846,260 - - - - - - 47,846,260 20607 11TH STREET-FLAMINGO NEIGHBORHOOD 1,942,680 - - - - - - 1,942,680 20719 SCADA AND PLC SYSTEMS 1,237,500 1,625,250 - - - - - 2,862,750 ATTACHMENT A �, t/�t I AAA BEACH CITY OF MIAMI BEACH �VFY 2020-2024 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY PROJECT PROJECT NAME Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 21220 INDIAN CREEK STREET DRAINAGE IMP. 5,267,542 - - - - - - 5,267,542 23000 SUNSET HARBOUR PUMPSTATION UPGRADES 3,750,973 - - - - - - 3,750,973 23180 BAYSHORE NEIGH.BID PACK D 2,343,000 - - - - - - 2,343,000 23270 CITY CENTER COMMERCIAL DISTRICT BPB 2,300,000 - - - - - - 2,300,000 23360 WEST AVE/BAY RD NEIGH. 515,356 - - - - - - 515,356 23380 PALM&HIBISCUS ISLAND ENHANCEMENT 5,699,315 - 5,699,315 25750 WEST AVE BDG OVER COLLINS CANAL 283,380 - - - - - - 283,380 28920 BIOSWALE PILOT PROJECT - 850,000 - - - - 850,000 28940 BAYSHORE NEIGH.CENTRAL-SOUTH 1,065,000 - - - - - - 1,065,000 Fund Total: 72,609,207 19,576,375 - - - - - 92,185,582 431 2011 STORMWATER BOND2011-27782 21270 VENETIAN NEIGH.-ISLANDS 2,592,490 - - - - - 2,592,490 22050 BAYSHORE NEIGH.BID PACK A 10,632,774 - - - - - - 10,632,774 23000 SUNSET HARBOUR PUMPSTATION UPGRADES 3,552,816 - - - - - 3,552,816 23180 BAYSHORE NEIGH.BID PACK D 2,606,560 - - - - - - 2,606,560 23240 LA GORCE NEIGHBORHOOD IMPROVEMENTS 2,039 - - - - - - 2,039 23270 CITY CENTER COMMERCIAL DISTRICT BPB 132,000 - - - - - - 132,000 23300 FLAMINGO NEIGHBORHOOD-SOUTH 205,800 - - - - - - 205,800 23360 WEST AVE/BAY RD NEIGH. 5,854,876 - - - - - - 5,854,876 23380 PALM&HIBISCUS ISLAND ENHANCEMENT 1,535,601 - - - - - - 1,535,601 28940 BAYSHORE NEIGH.CENTRAL-SOUTH 104,420 - - - - - - 104,420 Fund Total: 27,219,376 - - - .. - 27,219,376 432 STORMWATER BONDS 2015 21270 VENETIAN NEIGH.-ISLANDS 20,516,285 - - - - 20,516,285 22050 BAYSHORE NEIGH.BID PACK A 590,216 - - - - - - 590,216 23000 SUNSET HARBOUR PUMPSTATION UPGRADES 12,962,851 - - - - - - 12,962,851 23180 BAYSHORE NEIGH.BID PACK D 4,177,000 - - - - - 4,177,000 23270 CITY CENTER COMMERCIAL DISTRICT BPB 5,856,402 - - - - - - - 5,856,402 23360 WEST AVE/BAY RD NEIGH. 4,433,928 - - - - - - 4,433,928 23380 PALM&HIBISCUS ISLAND ENHANCEMENT 22,578,586 - - - - - - 22,578,586 27370 541N DIAMETER REDUNDANT SEWER FORCE 3,607,765 - - - - - - 3,607,765 28940 BAYSHORE NEIGH.CENTRAL-SOUTH 11,686,706 - - - - - - 11,686,706 Fund Total: 86,409,739 - - - - - - 86,409,739 433 STORMWATER PROJECTS-MDC ILA 20422 FLAMINGO NEIGHBORHOOD - 300,000 - - - - 300,000 21220 INDIAN CREEK STREET DRAINAGE IMP. 7,093,058 - - - - - - 7,093,058 23180 BAYSHORE NEIGH.BID PACK D 1,200,000 - - - - 1,200,000 23220 NORTH SHORE NEIGH.IMPROVEMENTS 450,000 - - - - 450,000 ATTACHMENT A CITY OF MIAMI BEACH MIAMIBEACH FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY PROJECT PROJECT NAME Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 23380 PALM&HIBISCUS ISLAND ENHANCEMENT 1,396,329 1,293,847 - - - - - 2,690,176 24020 ORCHARD PARK 250,000 - - - - - - 250,000 28300 SHANE WATERSPORT SEAWALL 650,000 - - - - - - 650,000 29020 CITYWIDE SEAWALL REHAB - 5,000,000 5,000,000 5,000,000 5,000,000 5,000,000 - 25,000,000 29300 LINCOLN RD LENOX-COLLINS W/SIDE STR - - 5,035,000 - - - - 5,035,000 Fund Total: 11,039,387 6,593,847 10,035,000 5,000,000 5,000,000 5,000,000 - 42,668,234 434 STORMWATER CAPITAL NOT BONDS • 21220 INDIAN CREEK STREET DRAINAGE IMP. 232,458 - - - - - 232,458 21720 DRAINAGE SYSTEM WATER QUALITY PILOT - 500,000 - - - - 500,000 23270 CITY CENTER COMMERCIAL DISTRICT BPB 628,603 - - - - 628,603 23360 WEST AVE/BAY RD NEIGH. 401,046 - - - - 401,046 29820 STORM WATER OUTFALLS - 2,000,00C 2,000,000 Fund Total: 1,262,107 2,500,000 - - - - 3,762,107 435 SANITATION ENTERPRISE FUND 21920 RECONFIGURATION OF SANITATION AREA - 200,006 - - 200,000 63718 SANITATION INTERIOR REPLACEMENT 190,000 - - - 190,000 64318 BAYSHORE GREEN WASTE FACILITY 1,326,761 - - - - 1,326,761 69470 FLEET/SANITATION FIRE ALARM SYSTEM 42,900 - - - - - - 42,900 Fund Total: 1,559,661 200,000 - - - - - 1,759,661 439 MIAMI-DADE COUNTY BOND-MBCC 28160 CONVENTION CENTER RENOVATION 54.426,432 - - - - - - 51,426,432 Fund Total: 54,426,432 - - - - - - 54,426,432 440 CONVENTION CENTER OPERATIONS 21618 CONVENTION CENTER GARAGE EQUIPMENT 121,000 - - - - - - 121,000 28160 CONVENTION CENTER RENOVATION 1,557,174 - - - - - - 1,557,174 28170 CONVENTION CENTER PARK 1,500,000 212,000 - - - - - 1,712,000 64219 CARL FISHER COMMERCIAL KITCHEN 244,950 - - - - - - 244,950 65018 CONV.CNTR FOOD&BEVERAGE FF&E 2,803,000 - - - - - - 2,803,000 Fund Total: 6,226,124 212,000 - - - - 6,438,124 441 CONVENTION DEVELOPMENT TAX$35M 28160 CONVENTION CENTER RENOVATION 19,921 - - - - - 19,921 Fund Total: 19,921 - - 19,921' 442 CONVENTION DEVELOPMENT TAX$15M 28160 CONVENTION CENTER RENOVATION 2,457,531 - - - - - - 2,457,531 Fund Total' 2,457,531 - - - 2,457,531 463 RDA-GARAGE FUND 20022 16TH ST.GARAGE-JOINT REPLACEMENT - - - 200,000 - - - 200,000 20200 TRANSPORTATION CAPITAL INITIATIVE 7,000,000 - - - - - - 7,000,000 ATTACHMENT A 1IAMIE!J'�1` C� t CITY OF MIAMI BEACH BEACH FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY PROJECT PROJECT NAME Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 21124 16TH ST GARAGE-EXTERIOR RENEWAL - - - - - 400,000 - 400,000 28010 COLLINS PARK PARKING GARAGE 2,069,000 - - - - - - 2,069,000 60023 16TH ST GARAGE-WATER DISTRIBUTION - - - - 75,000 - - 75,000 60190 ANCHOR GARAGE ELEVATOR REPLACEMENT 357,995 - - - - - - 357,995 60324 16TH STREET GARAGE-GENERATOR - - - - - 250,000 - 250,000 61017 ANCHOR GARAGE LIGHTING 277,219 - - - - - - 277,219 61718 16TH STREET GARAGE FIRE SPRINKLER 300,000 - - - - - - 300,000 61760 REVENUE CONTROL EQUIPMENT PHASE I 362,000 - - - - - - 362,000 61818 16TH STREET GARAGE STAIRWAYS 30,000 - - - - - - 30,000 61918 16TH STREET GARAGE ROOF AND DECK 1,808,000 - - - - - - 1,808,000 62721 16TH STREET GARAGE-OFFICE/RESTROOM - - 30,000 - - - - 30,000 62821 16TH STREET GARAGE-ROOF TOP RENEWAL - - 25,000 - - - - 25,000 65019 16TH STREET GARAGE(ANCHOR)-PAINT 100,000 - - - - - - 100,000 66918 ANCHOR GAR.-FIRE ALARM REPLACEMENT - 120,000 - - - - - 120,000 67018 ANCHOR GARAGE-STAIRWELL DOORS - 27,000 - - - - - 27,000 67118 ANCHOR-INTERIOR FLOOR DRAINAGE - 30,000 - - - - 30,000 Fund Total: 12,304,214 177,000 55,000 200,000 75.000 650,000 - 13,461,214 465 RDA-ANCHOR SHOPS FUND 20200 TRANSPORTATION CAPITAL INITIATIVE 6,000 0+)0 - - - 6,000,000 Fund Total: 6,000,000 - - - - - - 6,000,000 467 PENN GARAGE FUND 20025 PENN GARAGE-ELEVATOR RENEWAL - - - - - - 500,000 500,000 26100 GARAGE SECURITY CAMERA SYSTEM 20,000 - - - - - 20,000 60025 PENN GARAGE-ROOFTOP-STAIRS ELEVATOR - - - - - - 40,000 40,000 60424 PENN GARAGE-GENERATOR RENEWAL - - - - - 200,000 - 200,000 60524 PENN GARAGE-DOMESTIC WATER DIST. - - - 75,000 - 75,000 60823 PENN GARAGE-FIRE SPRINKLER RENEWAL - - - - 300,000 - - 300,000 60923 PENN GARAGE-FIRE PUMP REPLACEMENT - - - - 100,000 - - 100,000 61023 PENN GARAGE-FIRE ALARM SYSTEM - - - - 35,000 - - 35,000 61760 REVENUE CONTROL EQUIPMENT PHASE I 471,000 - - - - - - 471,000 62921 PENN GARAGE-LIGHTING RENEWAL - - 200,000 - - - - 200,000 63021 PENN GARAGE-HVAC RENEWAL - - 50,000 - 35,000 - 35,000 120,000 63121 PENN GARAGE-TRAFFIC COATING-RETAIL - - 40,000 - - - - 40,000 64319 PENN GARAGE-NEW LIGHTING DISPLAY 135,000 - - - - - - 135,000 67218 PENN GRGE-SEALING OF SUPERSTRUCTURE - 25,000 - - - - - 25,000 67318 PENN GARAGE-INT SURFACE RESTORATION - 95,000 - - - - - 95,000 Fund Total: 626,000 120,000 290,000 - 470,000 275,000 575,000 Z356,000 480 PARKING OPERATIONS FUND ATTACHMENT A CITY OF MIAMI BEACH 1 V N1 FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY PROJECT PROJECT NAME Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 20087 GARAGE AT P23-1623 WEST AVENUE 18,000 - - - - - - 18,000 25650 CITYWIDE CURB RAMP INSTALLATION 20,000 - - - - - - 20,000 26100 GARAGE SECURITY CAMERA SYSTEM 250,000 - - - - - - 250,000 26290 17TH ST.PARKING GARAGE MAINTENANCE 100,000 - - - - - - 100,000 26340 PENRODS AT 1 OCEAN DR.PARKING LOT 52,340 - - - - - - 52,340 27480 SURFACE LOT P48 BASS MUSEUM LOT 220,000 - - - - - - 220,000 27830 PARKING GARAGE AT 1262 COLLINS AVE 1,148,000 - - - - - - 1,148,000 28080 INTELLIGENT TRANSPORT SYSTEM 2,500,000 - - - - - - 2,500,000 28710 P14 6TH ST&COLLINS PARKING LOT 150,000 - - - - - - 150,000 60130 13TH ST GARAGE FIRE ALARM 46,580 - - - - - - 46,580 60187 17TH STREET GARAGE LIGHTING FIXTURE 125,000 - - - - - - 125,000 61660 13TH STREET PARKING GARAGE ELEVATOR 184,800 140,500 - - - - - 325,300 61760 REVENUE CONTROL EQUIPMENT PHASE I 2,696,000 - - - - - - 2,696,000 61930 17TH STREET PARKING GARAGE ELEVATOR 876,000 - - - - - - 876,000 62100 42ND ST.PARKING GARAGE MAINTENANCE 240,000 - - - - - - 240,000 62940 CITYWIDE PARKING LOT LIGHTING 200,000 - - - - - - 200,000 69370 42ND ST.GARAGE FIRE ALARM SYSTEM 51,087 - - - - - - 51,087 69380 42ND ST GARAGE ELEVATOR REPLACEMENT 705,645 (140,500) - - - - - 565,145 Fund Total: 9,583,452 - - - - - 9,583,452 486 2010 PARKING BONDS 2010-27491 22020 GARAGE-LICENSE PLATE RECOGNITION - 463,205 - - . - - 463,205 26100 GARAGE SECURITY CAMERA SYSTEM 1,000,000 - . - - - - 1,000,000 26290 17TH ST.PARKING GARAGE MAINTENANCE 135,000 - - - - - - 135,000 29580 LOT 9D P86-6976 INDIAN CREEK DRIVE 468,000 - - - - - - 468,000 60119 17TH STREET PARKING GARAGE COATING 4,000,000 - - - - - - 4,000,000 60120 13TH STREET PARKING GARAGE COATING 800,000 - - - - - - 800,000 60187 17TH STREET GARAGE LIGHTING FIXTURE 329,900 - - - - - - 329,900 Fund Total: 6,732,900 463,205 - - - - - 7,196,105 488 PARKING REV BONDS SERIES 2015 21618 CONVENTION CENTER GARAGE EQUIPMENT 185,260 - - 185,260 28160 CONVENTION CENTER RENOVATION 64,811,756 - 64,811,756 Fund Total: 64,997,016 - - - - - - 64,997,016 490 PARKING CAPITAL NOT BONDS 20125 1755 MERIDIAN GARAGE ELEVATOR - - - - - 500,000 500,000 20225 SUNSET HARBOUR GARAGE ELEVATOR - - - - - - 500,000 500,000 20325 SUNSET HARBOUR GARAGE-ROOFTOP - - - - - - 300,000 300,000 20823 1755 MERIDIAN GRGE FIRE SPRINKLER - - - - 300,000 - - 300,000 20923 SUNSET HARBOUR GRGE SPRINKLER - - - - 300,000 - - 300,000 ATTACHMENT A MIAMI BEACH CITY OF MIAMI BEACH FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY PROJECT PROJECT NAME Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 21221 17TH ST.GARAGE INTERIOR DRAINAGE - - 750,000 - - - - 750,000 21224 1755 GARAGE GENERATOR - - - - - 200,000 - 200,000 21324 SUNSET HAARBOUR GARAGE GENERATOR - - - - - 200,000 - 200,000 21618 CONVENTION CENTER GARAGE EQUIPMENT 464,740 - - - - - - 464,740 21718 BISCAYNE BEACH ADDITIONAL PARKING 250,000 - - - - - - 250,000 22020 GARAGE-LICENSE PLATE RECOGNITION - 391,795 - - - - - 391,795 22120 12TH ST GRGE-ELEVATOR REPLACEMENT - 250,000 - - - - - 250,000 22122 SUNSET HARBOUR GARAGE SCREENING - - - 200,000 - - - 200,000 22150 72ND ST PARK AND PARKING STRUCTURE - 10,471,704 - - - - - 10,471,704 22220 17TH ST.GARAGE-ELECTRICAL FEEDER - - 225,000 - - - - 225,000 26100 GARAGE SECURITY CAMERA SYSTEM 89,472 - - - - - - 89,472 26340 PENRODS AT 1 OCEAN DR.PARKING LOT 150,000 - - - - - - 150,000 27830 PARKING GARAGE AT 1262 COLLINS AVE 3,410,306 - - - - - - 3,410,306 29580 LOT 9D P86-6976 INDIAN CREEK DRIVE 191,000 - - - - - - 191,000 60125 1755 MERIDIAN GARAGE OFFICE ROOF - - - - - - 300,000 300,000 60225 SUNSET HARBOUR GARAGE INT.FLOOR - - - - - - 34,000 34,000 60317 CITYWIDE PARKING LOTS IMPROVEMENTS - 150,000 150,000 150,000 150,000 150,000 - . 750,000 60522 12TH ST GARAGE-INT.FLOOR DRAINAGE - - - 25,000 - - - 25,000 60622 13TH ST.GARA-PARKING SIGN RENEWAL - - - 30,000 - - - 30,000 60624 17TH STREET GARAGE-EXTERIOR COATING - - - - - 300,000 - 300,000 60722 42 ST GRGE-STAIRW ELL WATERPROOFING - - - 50,000 - - - 50,000 60724 42ND STREET GARAGE-FIRE SPRINKLER - - - - - 40,000 - 40,000 60822 1755 MERIDIAN GARAGE LED LIGHTING - - - 150,000 - - - 150,000 60922 SUNSET HARBOUR GARAGE SEALING - - - 75,000 - - - 75,000 61022 SUNSET HARBOUR GRGE-TRAFFIC COATING - - - 300,000 - - - 300,000 61123 12TH ST GARAGE-STAIRWELL DOOR - - - - 32,000 - - 32,000 61217 13TH ST.GARAGE-WINDOW/GLASS BLOCK - - 30,000 - - - - 30,000 61223 12TH ST.GARAGE-STAIRWELL RAILING - - - - 25,000 - - 25,000 61317 13TH ST.GARAGE-STAIRWELL RAILING - - 25,000 - - - - 25,000 61323 42ND ST GARAGE-WATER DISTRIBUTION - - - - 75,000 - - 75,000 61417 17TH STGRGE INT.FLOOR DRAINAGE - - 30,000 - - - - 30,000 61423 1755 GARAGE FIRE PUMP REPLACEMENT - - - - 100,000 - - 100,000 61517 17 ST GRGE-STORAGE SPACE RENOVATION - - - 100,000 - - - 100,000 61523 SUNSET HARBOUR GARAGE FIRE PUMP - - - - 100,000 - - 100,000 61617 17TH ST GARAGE WATER DISTRIBUTION - - - - 75,000 - - 75,000 61623 SUNSET HARBOUR GARAGE-FIRE ALARM - - - - 35,000 - - 35,000 61717 42ND ST.GARAGE-50YR CERTIFICATION - - 300,000 - - - - 300,000 61817 42ND ST.GARAGE-STAIRWELL RAILING - - 25,000 - - - - 25,000 ATTACHMENT A ,� CITY OF MIAMI BEACH t\J 1 p I v\ F AC H FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY PROJECT PROJECT NAME Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 61917 1755 MERIDIAN GARAGE FLOOR DRAINAGE - - 200,000 - - - - 200,000 62017 SUNSET HARBOUR GARAGE LED LIGHTING - - 300,000 - - - - 300,000 62100 42ND ST.PARKING GARAGE MAINTENANCE 160,000 - - - - - - 160,000 62118 12TH STREET PARKING LIGHTING(LED) 64,000 - - - - - 64,000 62218 13TH STREET GARAGE LIGHTING(LED) 86,000 - - - - - - 86,000 62418 12TH STREET GARAGE ROOF AND DECK 598,806 - - - - - - 598,806 62518 1755 MERIDIAN GARAGE ROOF AND DECK 1,900,000 - - - - - - 1,900,000 62940 CITYWIDE PARKING LOT LIGHTING 250,000 - - - - - - 250,000 63221 12TH STREET GARAGE-DOMESTIC WATER - - 75,000 - - - - 75,000 63321 13TH STREET GARAGE-4OYR CERT. - - 300,000 - - - - 300,000 64018 17TH ST GARAGE 40YR RECERTIFICATION 755,427 - - - - - - 755,427 64419 13TH STREET GARAGE-WATER SYSTEM 33,000 - - - - - - 33,000 64519 17TH STREET GARAGE-1ST FL OFFICE 45,000 - - - - - - 45,000 64619 SURFACE LOTS CITYWIDE LANDSCAPING 100,000 - - - - - - 100,000 67418 42ND STREET GARAGE-DISPATCH AREA - 100,000 - - - - - 100,000 67518 1755 MERIDIAN AVE OFFICE SECURITY - 35,000 - - - - - 35,000 67618 12TH STREET GARAGE-ROOF RENEWAL - 64,000 - - - - - 64,000 67718 17TH STREET GARAGE-ROOFING REPAIRS - 30,000 - - - - - 30,000 67818 17 ST GARAGE-GENERATOR REPLACEMENT - 120,000 - - - - - 120,000 68018 42ND STREET GARAGE-GENERATOR - 71,000 - - - - - 71,000 68118 42ND ST GARAGE-INTERIOR DRAINAGE - 34,000 - - - - - 34,000 68218 CITYWIDE PARKING LOTS-SEAL COATING - 100.000 - - - - 100,000 Fund Total: 8,547,751 11,817,499 2,410,000 1,080,000 1,192,000 890,000 1,634,000 27,571,250 510 FLEET MANAGEMENT FUND 60058 FY18 VEHICLE/EQUIPMENT REPLACEMENT 2,507,000 - - - - - - 2,507,000 60417 FY 20 VEHICLE-EQUIPMENT REPLACEMENT - 7,468,000 - - - - - 7,468,000 61122 FY22 VEHICLE/EQUIPMENT REPLACEMENT - - - 9,313,000 - - - 9,313,000 61424 FY24 VEHICLE/EQUIPMENT REPLACEMENT - - - - 5,777,000 - 5,777,000 61723 FY23 VEHICLE/EQUIPMENT REPLACEMENT - - - - 5,420,000 - - 5,420,000 62130 HVAC CONTROLS REPLACEMENT FLEET 42,000 - - - - - - 42,000 63421 FY21 VEHICLE/EQUIPMENT RENEWAL - - 11,096,000 - - - - 11,096,000 65119 FY19 VEHICLE/EQUIPMENT REPLACEMENT 3,030,000 - - - - - - 3,030,000 67150 FY16 VEHICLE EQUIPMENT REPLACEMENT 5,110,000 - - - - - - 5,110,000 69470 FLEET/SANITATION FIRE ALARM SYSTEM 42,900 - - - - - - 42,900 Fund Total: 10,731,900 7,468,000 11,090,000 9,313,000 5,420,000 5,777,000 49,805,900 520 PROPERTY MANAGEMENT FUND 21818 PROPERTY MGMT FACILITY GENERATOR 250,000 - - - - - - 250,000 21918 PROPERTY MGMT FACILITY DUST CONTROL 45,000 - - - - - - 45,000 ATTACHMENT A AAAA IME/\ CITY OF MIAMI BEACH FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY PROJECT PROJECT NAME Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total Fund Total: 295,000 - - 295f000 550 COMMUNICATIONS FUND 22018 FIBER COMMUNICATIONS INSTALLATION 161,000 - 131,000 - - - - 292,000 22318 #49 PUBLIC SAFETY RADIO&VIPER SYS 2,100,000 (1,432,282) - - - - - 667,718 68450 BLDG DEV PROCESS ENT SYSTEM 1,600.000 - - - - - 1,600.000 Fund Total: 3,861,000 (1,432,282) 131,000 - - - - 2,559,718 552 INFO&COMMUNICATIONS TECH 61770 UPDATED AUTOMATION OF CLEANLINESS 34,440 - - - - - - 34,440 61790 MBPD OFF-DUTY EMPLOYMENT SOFTWARE 60,000 - - - - - 60,000 61830 AUTOMATION FIELD STAFF OPERATIONS 26,000 - - - - - 26,000 62680 ENT.SHAREPOINT IMPLEMENTATION 90,000 - - - - - 90,000 68450 BLDG DEV PROCESS ENT SYSTEM 58,468 - - - 58.468 Fund Total: 268,908 - - - - - 268,908 FGO NEIGH FUTURE G.O.BONDS NEIGHBORHOOD 24619 GO#37:SIDEWALK IMPROVEMENTS - - 3,000,000 - - 6,500,000 9,500,000 27319 GO#31:OCEAN DRIVE CORRIDOR - - 4,000,000 - - 16,000,000 20,000,000 27519 GO#34:ABOVE GROUND IMPROVEMENTS - - - 5,000,000 - - 38,000,000 43,000,000 27619 GO#35:FLAMINGO PARK NEIGHBORHOOD - - - - - - 20,000,000 20,000,000 27719 GO#36:WASHINGTON AVE.CORRIDOR - - - 2,000,000 - - 8,000,000 10,000,000 27819 GO#38:STREET PAVEMENT - - - 7,500,000 - - 15,000,000 22,500,000 27919 GO#39:SEAWALLS&SHORELINES - - - 2,000,000 - - - 2,000,000 28019 GO#40:41ST ST.CORRIDOR - - - 1,500,000 - - 12,000,000 13,500,000 28119 GO#41:LA GORCE NEIGHBORHOOD - - - 2,000,000 - - 12,000,000 14,000,000 28219 GO#44:NORTH SHORE NEIGHBORHOOD - - - - - - 8,000,000 8,000,000 68219 GO#33:STREET TREE MASTER PLAN - - - 2,500,000 - - - 2,500,000 68419 GO#42:TRAFFIC CALMING - - - 500,000 - - - 500,000 68619 GO#43:BIKE LANES&SHARED PATHS - - - 1,200,000 - 1,300,000 2 50Q000 Fund Total: - - - 31,200,000 - - 136,800,000 168,000,000 FGO P.SAFE FUTURE GO BONDS PUBLIC SAFETY 28319 GO#45:FIRE STATION#1 - - 3,000,000 - - 3,000,000 28719 GO#53:SECURITY FOR PUBLIC SPACES - - - 2,350,000 - - - 2,350,000 28419 GO#46:OCEAN RESCUE NOBE FACILITY - - - - - - 5,000,000 5,000,000 68519 GO#48:POLICE HQ FACILITY - - - - - 6,000,000 6,000,000 28619 GO#51:FIRE STATION#3 - - - - - 10,000,000 10,000,000 68919 GO#52:LED LIGHTING IN PARKS - 3,459,000 - - 3,459,000 69019 GO#55:STREET LIGHTING IMPROVEMENTS - - 5,000,000 - 5,000,000 Fund Total. - - - 13,809,000 - - 21,000,000 34,809,000 FGO PKS FUTURE G.O.BONDS PARKS ATTACHMENT A /0 I A Ij�1 M EAC CITY OF MIAMI BEACH FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY PROJECT PROJECT NAME Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 25019 GO#1:72ND ST.RECREATION CENTER - - - 43,000,000 - - - 43,000,000 25419 GO#5:FLAMINGO PARK&YOUTH CENTER - - - - - - 15,150,000 15,150,000 25519 GO#6:FISHER PARK - - - - - - 105,000 105,000 25619 GO#7:LA GORCE PARK - - - - - - 150,000 150,000 26019 GO#11:MUSS PARK - - - - - - 250,000 250,000 26219 GO#13:N.SHORE PARK&YOUTH CENTER - - - 795,000 - - - 795,000 26519 GO#18:SCOTT RAKOW YOUTH CENTER - - - 640,000 - - - 640,000 26719 GO#23:BAYWLK PEDESTRIAN BRIDGE - - - 5,000,000 - - - 5,000,000 26919 GO#27:LOG CABIN - - - 1,076,000 - - - 1,076,000 27019 GO#28:ART DECO MUSEUM - - - 2,000,000 - - - 2,000,000 27119 GO#29:WEST LOTS - - - 2,000,000 - - 2,000,000 4,000,000 27219 GO#30:SKATE PARK - - - - - - 750,000 750,000 67519 GO#14:PALM ISLAND PARK - - - 231,000 - - - 231,000 67619 GO#16:PINETREE PARK - - - 700,000 - - - 700,000 67719 GO#20:SOUTH POINTE PARK - - - - - - 480,000 480,000 67919 GO#22:TATUM PARK - - - - - - 840,000 840,000 68019 GO#25:WATERWAY RESTORATION - - - - 1,500,000 - - 4,500,000 6,000,000 Fund Total: - 56;942,000 - - 24,225,000 81,167,000 ATTACHMENT A tIAMI EAC i�} t CITY OF MIAMI BEACH -�1 FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY PROJECT PROJECT NAME Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total FSW FUTURE STORMWATER 20124 ALLISON ISLAND NORTH - - - - - 6,154,321 - 6,154,321 20224 NORMANDY SHORES - - - - - 29,147,027 - 29,147,027 20323 LA GORCE ISLAND - - - - - 9,104,921 - 9,104,921 20324 BELLE ISLE - - - - - 4,550,621 - 4,550,621 20422 FLAMINGO NEIGHBORHOOD - - - 55,854,121 55,854,121 - - 111,708,242 20424 BISCAYNE BEACH - - • - - - 20,445,421 - 20,445,421 20522 NAUTILUS NEIGHBORHOOD - - 250,000 - 29,236,421 - - 29,486,421 20524 BISCAYNE POINT - - - - - 13,266,321 - 13,266,321 20624 CENTRAL BAYSHORE - - - - - 7,963,400 - 7,963,400 20719 SCADA AND PLC SYSTEMS - - 1,237,500 - - - - 1,237,500 20724 INDIAN CREEK PARKWAY - - - - - 9,217,121 - 9,217,121 20824 PARK VIEW ISLAND - - - - - 4,759,121 - 4,759,121 20922 NORMANDY ISLES DRAINAGE IMPROVEMENT - - - 21,004,861 21,004,861 - - 42,009,722 20924 STAR ISLAND - - - - - 6,032,621 - 6,032,621 21122 SUNSET ISLAND 1 - - - - 5,319,421 - - 5,319,421 21222 SUNSET ISLAND 2 - - - - 7,446,121 - - 7,446,121 22320 LAKEVIEW NEIGHBORHOOD IMPROVEMENTS - - 25,600,000 - - - - 25,600,000 22418 MT.SINAI STORMWATER PUMP STATION - - 13,227,421 - - - - 13,227,421 22720 PUBLIC WORKS FACILITY-PUMP STATION - - 2,300,000 - - - - 2,300,000 23220 NORTH SHORE NEIGH.IMPROVEMENTS - - 40,627,421 - - - - 40,627,421 23240 LA GORCE NEIGHBORHOOD IMPROVEMENTS - - 40,000,000 - - - - 40,000,000 23270 CITY CENTER COMMERCIAL DISTRICT BPB - - - 40,227,421 - - - 40,227,421 24020 ORCHARD PARK - - 5,000,000 - - 8,688,421 - 13,688,421 24120 TOWN CENTER - - 32,000,000 - - - - 32,000,000 Fund Total: - - 160,242,342 117,086,403 118,860,945 119,329,316 - 515,519,006 FWS FUTURE WATER&SEWER 20422 FLAMINGO NEIGHBORHOOD - - 300,000 - 26,000,000 - - 26,300,000 20619 WASTE WATER STATIONS REHABILITATION - - 5,850,000 5,850,000 5,850,000 5,850,000 - 23,400,000 21020 ALTON RD.WATER MAIN IMPROVEMENTS - - 11,700,000 - - - - 11,700,000 21322 ALTON ROAD UTILITIES - - - - 11,700,000 - - 11,700,000 22320 LAKEVIEW NEIGHBORHOOD IMPROVEMENTS - - 15,400,000 - - - - 15,400,000 22418 MT.SINAI STORMWATER PUMP STATION - - 6,500,000 - - - - 6,500,000 22720 PUBLIC WORKS FACILITY-PUMP STATION - - 2,990,000 - - - - 2,990,000 23220 NORTH SHORE NEIGH.IMPROVEMENTS - - - 19,500,000 - - - 19,500,000 23240 LA GORCE NEIGHBORHOOD IMPROVEMENTS - - 40,000,000 - - - - 40,000,000 23270 CITY CENTER COMMERCIAL DISTRICT BPB - - - 7,280,000 7,280,000 - - 14,560,000 24120 TOWN CENTER - - 20,000,000 - - - - 20,000,000 ATTACHMENT A AA I AM I BEACH CITY OF MIAMI BEACH FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY PROJECT PROJECT NAME Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future 7 otai 29300 LINCOLN RD LENOX-COLLINS W/SIDE STR - - 2.600.000 - - - 2,600,000 Fund Total: 105,340,000 32,630,000 50,830,000 5,850,000 - 194,650,000 Future Funding Not Designated 20018 ADAPTIVE TRAFFIC SIGNAL CONTROLS - - - - - 1,800,000 1,800,000 20021 INDIAN CREEK PEDESTRIAN BRIDGE - - - - - 595,000 595,000 20031 NORTH BEACH PARKING GARAGE - - - - - - 10,000,000 10,000,000 27800 STREET LIGHTING IMPROVEMENTS - - - 12,500.000 12 500 000 12500,000 12,500,000 50,000,000 Fund Total: - - 12,500,000 12,500.000 12.500,000 24,895,000 62,395,000 Grand Total: 1,578,510,6711 88,171,5161 326,160,7291 291,499,9701 206,397,4451 154,631,316' 232,540,0001 2,877,911,647 I M I EA IM CITY MIAMI BEACH FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY PROGRAM ATTACHMENT B PROJECT PROGRAM Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total ART IN PUBLIC PLACES TOURISM CULTURAL DEVELOPMENT 20377 AIPP MB CONVENTION 7,020,751 - - - - - - 7,530,797 22618 AIPP FIRE STATION 2 95,334 - - - 95,334 22718 AIPP FLAMINGO PARK PROJECT 194,000 - - - - - 194,000 22918 AIPP LUMMUS PARK PROJECT 116,000 - - - - - 116,000 27810 AIPP ART PROJECT SOUNDSCAPE 352,000 - - - 352,000 8,288.131 - - - - 8,288.131 TOTAL: 8,288,131 - - - - - - 8,288,131 BRIDGES PROPERTY MANAGEMENT 61719 41ST STREET BRIDGES REPAIR 50,000 - 480.700 - - - - 960,000 64620 ALLISON BRIDGE RAILING PROJECT - - 60,000 - - - 60,000 480,000 - 540,000 - - - - 1,020,000 PW ADMINISTRATION 65519 BRIDGE REPAIRS FY19 280.000 - - - - - - 280.000 PW ENGINEERING 20021 INDIAN CREEK PEDESTRIAN BRIDGE - 595,000 . 595,000 22920 CITYWIDE BRIDGES 706,077 2,293,923 - - 3,000,000 25750 WEST AVE BDG OVER COLLINS CANAL 7145127 - 7,145,127 7,145,127 706,077 2,293,923 - - - 595,000 10,740,127 TOURISM CULTURAL DEVELOPMENT 64160 PAINTING 8 LIGHTING OF BRIDGES 1,160,000 425,000 910,000 - - 2,495,000 67140 81ST ST PEDESTRIAN BRIDGE 180.000 - - 180,000 1,340,000 425,000 910,000 - - - 2,675,000 TOTAL: 9,245,127 1,131,077 3,743,923 - 595,000 14,715,127 CONVENTION CENTER CAPITAL IMPROVEMENT PROGRAM 28180 CONVENTION CENT ER-CARL FISHER 3,912,900 - - - - - - 3,912,900 CMO CONVENTION CENTER DISTRICT 28140 CONVENTION CENTER HOTEL 600,000 - - - - - 600,000 28160 CONVENTION CENTER RENOVATION 615,421,648 - - - - 615,421,648 28170 CONVENTION CENTER PARK 9,250,000 212,0(10 - - - 9,462,000 625,271,648 212,000 - - - - 625,483,648 PARKING ADMINISTRATION 2171`s CO ELATION N ER 0..GF EQUIPMENT 771,000 - - - - - - 771,000 TOTAL: 629,955,548 212,000 - - - - - 630,167,548 ENVIRONMENTAL ApRAL IMF v. 21018 BAYWALK PHASE 2 386,000 - - - - 386,000 21119 BAYWALK 10TH TO 12TH STREET 310,000 - - - - - - 310,000 v I ECLY MIAMI BEACH ATTACHMENT B FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY PROGRAM PROJECT PROGRAM Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 28070 MIDDLE BEACH REC.CORRIDOR PH III 2,675,000 - - - - - - 2,675,000 61920 MAURICE GIBB SOIL REMEDIATION 1,092,000 - - 1,092.000 4,463,000 - - - - 4,463,000 ENVIRONMENT SUSTAINABILITY % , t F, , ' ., 62719 FLEET MGMT FACILITY REMEDIATION 111,000 - - - - - 111,000 62819 LAKE PANCOAST MANGROVE PLANTER 30,000 - 1,450,000 - - - - 1,480,000 68019 GO#25:WATERWAY RESTORATION - - - 1,500,000 - - 4,500,000 6,000,000 69520 WATERWAY RESTORATION - 250,000 - - - - 250,000 141,000 250,000 1.450,000 1,500,000 - 004''' . 4,500,000 7,841,000 TOTAL: 4,604,000 250,000 1,450,000 1,500,000 4,500,000 12,304,000 EQUIPMENT BUILDING 68450 BLDG DEV PROCESS ENT SYSTEM 1,658,468 - - - - - - 1.658,468 CAPITAL IMPROVEMENT PROGRAM 20417 OCEAN RESCUE 79TH SUB HEADQUARTERS 168,000 - - - - 168,000 FIRE PREYENT1ON ,,4,44, ., „vo 21318 F-550 MOBILE AIR TRUCK UNIT 271.000 - - 2.0000 FLET MANAGEMENT 1, 60058 FY18 VEHICLE/EQUIPMENT REPLACEMENT 2,507,000 - - - - - 2,507,000 60417 FY 20 VEHICLE-EQUIPMENT REPLACEMENT - 7,468,000 - - 7,468,000 61122 FY22 VEHICLE/EQUIPMENT REPLACEMENT - - 9,313,000 - - 9,313,000 61424 FY24 VEHICLE/EQUIPMENT REPLACEMENT - - - - - 5,777,000 - 5,777,000 61723 FY23 VEHICLE/EQUIPMENT REPLACEMENT - - - - 5,420,000 - 5,420,000 63421 FY21 VEHICLE/EQUIPMENT RENEWAL - - 11,096,000 - - - 11,096,000 65119 FY19 VEHICLE/EQUIPMENT REPLACEMENT 3,030,000 - - - - - 3,030,000 67150 FY16 VEHICLE EQUIPMENT REPLACEMENT 5.110,000 - - 5,110,000 10,647,000 7,468,000 11,096,000 9,313,000 5,420,000 5,777,000 ' 49,721,000 IT SUPPORT 62680 ENT.SHAREPOINT IMPLEMENTAHON 90,000 - - - - - - 90,000 `ORGANIZATIONAL DEVELOPMENT 61770 UPDATED AUTOMATION OF CLEANLINESS :'s 4,440 - - - - - - 34,440 POLICE CHIEF OFFICE ” , 20297 EXPANSION OF CITY WIDE SURVEILLANCE 180,000 - - 180,000 20307 MBPD CAMERA SYSTEM UPGRADES 64,000 - - - 64,000 21620 SECURITY CAMERAS ON BEACHWALK 23-46 - 903,000 - - - - - 903,000 22118 ENTERTAINMENT DISTRICT CAMERAS 170,000 - - - - - - 170,000 22819 GO#57:CAMERAS-ENTERTAINMENT DIST. 1,490,000 - - - - - - 1,490,000 28519 GO#47:LICENSE PLATE READERS 1,950,000 - - - - - - 1,950,000 61790 MBPD OFF-DUTY EMPLOYMENT SOFTWARE 60,000 - - - - - - 60,000 68819 GO#50:CAMERAS-BUSINESS DIST. 825,000 - - - - - 825,000 I; k I A Iv\ BEACH Etc CIMIAMI BEACH ATTACHMENT B �YJ�II FY 2020-2024 CAPITALAL IMPROVEMENT PLAN BY PROGRAM PROJECT PROGRAM Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 69119 GO#56:CAMERAS-BEACHWLK 400,000 - - - - - - 400,000 5,139,000 903,000 - - - - - 6,042,000 ;PROPERTY MANAGEMENT 21818 PROPERTY MGMT FACILITY GENERATOR 345,00u - 340,;x3,0 21918 PROPERTY MGMT FACILITY DUST CONTROL 45,000 - - - - - 45,000 23118 FIRE STATION 4 SECURITY ENHANCEMENT 90,000 - - - - - 90.000 60007 POLICE STATION NEW GENERATOR 555,000 - - - - - - 555,000 60019 777 BUILDING-CHILLER REPLACEMENT 138,000 - - - - - - 138,000 60020 FLEET MGMT-GENERATOR TRNSFR SWITCH - - 100,000 - - - - 100,000 60057 FIRE STATION 3 EMERGENCY GENERATOR 100,000 - - - - - - 100,000 66720 COLONY THEATER-SOUND AND VIDEO - - 100,000 - - - 100,000 67920 SMART BUILDING AUTOMATION SYSTEM - 100.000 - - - - 100,000 1,273,000 100,000 200,000 • - - - 1,573,000 PUBLIC SAFETY COMMUNICATIONS 22318 #49 PUBLIC SAFETY RADIO SYSTEM 2 1 0''U , /2021 - - - - - 367,718 23119 GO#49:PUBLIC SAFETY RADIO SYSTEM 1 ( 2 r3C - - 0 000 12,100,000 (1,432,282) - - - - • 10,667,718 PW GREENSPACE MANAGEMENT 61830 AUTOMATION FIELC 5T7'F f 10'A '003 20,000 - - - - - - 26,030 TOURISM CULTURAL DEVELOPMENT 65018 CONV.CNTR FOOD&BEVERAGE FF&E 2,803,000 - - - - - 2.803,000 TOTAL: 34,209,9081 7,038,7181 11,296,0001 9,313,0001 5,420,0001 5,777,0001 •1 73,054,626 GENERAL PUBLIC BUILDINGS BUILDING 26990 SECOND FL,RENOVATION-BUILDING DEFT 629,898 - - - - - - 629,898 CAPITAL IMPROYEM!!NT PROGRAM 20627 NORTH SHORE BANDSHELL CANGP6 668,000 - - 608 200 22218 NORTH BEACH YARD 553,467 - - - - - - 553,467 24530 SUNSET ISLANDS 1&2 GUARDHOUSE 648,225 20,000 - - - - - 668,225 28319 GO#45:FIRE STATION#1 7,000,000 - - 3,000,000 - - - 10,000,000 28600 NORTH SHORE PARK RESTROOMS 1,001,000 - - - - - - 1,001,000 9,870,692 20,000 - 3,000,000 - - - 12,890,692 ENVIRONMENT SUSTAINABILITY 6-1318 BAYSHORE GREEN WASTE f-ACILIOY 1,326.761 - - - - - - 1,326,761 FIRE PREVENTION 28011, 00:51:FIRE STATION#e - - - - - - 10,000000 10,000,000 FIRE RESCUE 28419 GO#46:OCEAN RESCUE NOBE FACILITY - - 5.000.000 5.000,000 62919 OUTDOOR TRAINING FACILITY(FIRE) 100,000 - - - - 100,000 100,000 - - - - - 5,000,000 5,100,000 CITY OF MIAMI BEACH ATTACHMENT B I AAA FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY PROGRAM PROJECT PROGRAM Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future TotaI HOUSING COMMUNITY SERVICES 20427 LOTTIE APARTMENTS 1,307.622 - - - - - - 1.307,626 65418 BISCAYNE BEACH HOUSE(AFFORDABLE HOUSING) 1.079,611/2 h(,7 037 - - - - - 1,746,037 2,386,626 667,037 - 3,053,663 PARKS AND RECREATION 20920 NORTH SHORE BANDSHELL REAR SEATING 68.000 - 188,000 POE.ICE CHIEF OFFICE 28819 GOt54.F.IARC,E PATROL FACILITY 2 i,^,001, - - - - - - 2,700,000 PROPERTY MANAGEMENT 20721 GREENSPACE FACILITY RENOVATION - 1,000,000 - - - - 1,000,000 22720 PUBLIC WORKS FACILITY-PUMP STATION - 5,290,000 - - - - 5,290,000 27019 GO#28:ART DECO MUSEUM - - 2,000,000 - - - 2,000,000 6,290,000 2,000,000 - - 8,290,000 TOURISM CULTURAL DEVELOPMENT 20421 NORTH SHORE BANDSHELL REAR CANOPY - - 310000 - - - - 310,000 20497 BASS MUSEUM PARK CAFE FF&E 100,000 - - - - 100,000 24550 BASS MUSEUM SPACE EXPANSION 7,500,000 - - - - - - 7,500,000 7,600,000 - 310,000 - - - - 7,910,000 TOTAL: 24,613,977 875,037 6,600,000 5,000,000 - - 15,000,000 52,089,014 GOLF COURSES CAPITAL IMPROVEMENT PROGRAM 26270 COMMUNITY PARK(PAR 3)RENOVATIONS 5,460190 - - - - - - 5,460,190 PARKS AND RECREATION 44,41 20108 MIAMI B.GOLF COURSE PRACTICE TEE R 124,000 - - - - - 124,000 20623 MIAMI BEACH GOLF COURSE RENOVATION - - - - 5,000,000 - - 5,000,000 64118 BGC GOLF CART STAGING AREA 65,000 - - - - - - 65,000 66320 MB GOLF CLUB DRIVING RANGE LIGHTING - - - 80,000 68120 NORMANDY SHORES GOLF CLUB PUMPS 50,000 189,000 - 130,000 - 5,000,000 - - 5,319,000 PROPERTY MANAGEMENT 20820 MB GOLF COURSE STORAGE TANK CC,CA; 200,000 21120 MIAMI BEACH GOLF CLUBHOUSE ROOF - 245,000 - - - - 245,000 21420 MB GOLF COURSE IRRIGATION PUMP - 100,000 - - - - 100,000 60921 N.SHORES GOLF CLUB-CLUBHOUSE ROOF - 175,000 - - - 175,000 545,000 175,000 - - 720,000 TOTAL: 5,649,190 545,000 _ 305,000 - 5,000,000 - - 11,499,190 MONUMENTS PROPERLY MANAGEMENT 20001 ALTON ROAD FOUNTAIN AT 20TH STREET 279,000 - - - - - - 279,000 24630 FLAGLER MONUMENT SOLAR ILLUMINATION 322,000 - - - - - - 322,000 60031 WATER TOWER RESTORATION STAR ISLAND - - 350,000 - - - 350,000 I ANAI BEAC IM CITY MIAMI BEACH V H FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY PROGRAM ATTACHMENT B PROJECT PROGRAM Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 601,000 - 350000 - - - 951,000 TOURISM CULTURAL DEVELOPMENT 20011 WORLD WAR MEMORIAL - - 62,000 - - - - 62,000 TOTAL: 601,000 - 412,000 - - - - 1,013,000 PARKING • CAPITAL IMPROVEMENT PROGRAM 21718 BISCAYNE BEACH ADDITIONAL PARKING 250,()0 - - - - - - 250.000 TOTAL: 250,000' -' -, -, , -, -, 250,000 PARKING GARAGES CAPITAL IMPROVEMENT PROGRAM 20087 GARAGE AT P23-1623 WEST AVENUE 106,786 - - - - - - 106,786 22150 72ND ST PARK AND PARKING STRUCTURE 746,000 10,600,000 - - - - - 11,346,000 27830 PARKING GARAGE AT 1262 COLLINS AVE 14,267,000 - - - - - - 14,267,000 28010 COLLINS PARK PARKING GARAGE 27,590,271 - - - - - 27,590,271 67520 7TH STREET GARAGE-ROOFING REPAIRS - 84,000 - 84.000 42,710,057 10,684,000 - - - - - 53,394,057 PARKING ADMINISTRATION 20031 NORTH BEACH PARKING GARAGE - - - - - 10,000,000 10,000,000 22020 GARAGE-LICENSE PLATE RECOGNITION - 855.000 - - - - 855,000 26100 GARAGE SECURITY CAMERA SYSTEM 1,413,057 - - - - - 1,413,057 61760 REVENUE CONTROL EQUIPMENT PHASE I 3,832,000 - - - 3,832,000 5,245,057 855,000 - - - - 10,000,000 16,100,057 PROPERTY MANAGEMENT 20022 16TH ST.GARAGE-JOINT REPLACEMENT - - 200,000 - - 200,000 20025 PENN GARAGE-ELEVATOR RENEWAL - . - 500,000 500,000 20026 7TH STREET GARAGE-ELEVATOR - - - - - - 400,000 400,000 20125 1755 MERIDIAN GARAGE ELEVATOR - - - - - - 500,000 500,000 20225 SUNSET HARBOUR GARAGE ELEVATOR - - - - - - 500,000 500,000 20325 SUNSET HARBOUR GARAGE-ROOFTOP - - - - - - 300,000 300,000 20823 1755 MERIDIAN GRGE FIRE SPRINKLER - - - - 300,000 - - 300,000 20923 SUNSET HARBOUR GRGE SPRINKLER - - - - 300,000 - - 300,000 21121 7TH ST GRGE-ENTRANCE FLOOD CONTROL - - 275,000 - - - - 275,000 21124 16TH ST GARAGE-EXTERIOR RENEWAL - - .. - - 400,000 - 400,000 21221 17TH ST.GARAGE INTERIOR DRAINAGE - - 750,000 - - - - 750,000 21224 1755 GARAGE GENERATOR - - - - - 200,000 - 200,000 21324 SUNSET HAARBOUR GARAGE GENERATOR - - - - - 200,000 - 200,000 21920 RECONFIGURATION OF SANITATION AREA - 200,000 - - - - - 200,000 22120 12TH ST GRGE-ELEVATOR REPLACEMENT - 250,000 - - - - - 250,000 22122 SUNSET HARBOUR GARAGE SCREENING - - - 200,000 - - - 200,000 22220 17TH ST.GARAGE-ELECTRICAL FEEDER - - 225,000 - - - 225,000 CITY OF MIAMI BEACH ATTACHMENT B AAI 'Q FY 2020 -2024 CAPITAL IMPROVEMENT PLAN BY PROGRAM PROJECT PROGRAM Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 26290 17TH ST.PARKING GARAGE MAINTENANCE 235,000 - - - - - - 235,000 60023 16TH ST GARAGE-WATER DISTRIBUTION - - - - 75,000 - - 75,000 60025 PENN GARAGE-ROOFTOP-STAIRS ELEVATOR - - - - - - 40,000 40,000 60119 17TH STREET PARKING GARAGE COATING 4,000,000 - - - - - - 4,000,000 60120 13TH STREET PARKING GARAGE COATING 800,000 - - - - - - 800,000 60124 7TH STREET GARAGE-LANDSCAPING - - - - - 120,000 - 120,000 60130 13TH ST GARAGE FIRE ALARM 46,580 - - - - - - 46,580 60187 17TH STREET GARAGE LIGHTING FIXTURE 454,900 - - - - - - 454,900 60190 ANCHOR GARAGE ELEVATOR REPLACEMENT 357,995 - - - - - - 357,995 60224 7 ST GARAGE-SUPERSTRUCTURE RENEWAL - - - - - - 250,000 250,000 60324 16TH STREET GARAGE-GENERATOR - - - - - 250,000 - 250,000 60422 7TH ST GARAGE-FIRE SPRINKLER&PUMP - - - 300,000 - - - 300,000 60424 PENN GARAGE-GENERATOR RENEWAL - - - - - 200,000 - 200,000 60522 12TH ST GARAGE-INT.FLOOR DRAINAGE - - - 25,000 - - - 25,000 60524 PENN GARAGE-DOMESTIC WATER DIST. - - - - - 75,000 - 75,000 60620 7TH STREET GARAGE-INTERIOR DRAINAGE - 30,000 - - - - - 30,000 60622 13TH ST.GARA-PARKING SIGN RENEWAL - - - 30,000 - - - 30,000 60623 7TH STREET GARAGE-STAIRWELL RAILING - - - - 25,000 - - 25,000 60624 17TH STREET GARAGE-EXTERIOR COATING - - - - - 300,000 - 300,000 60722 42 ST GRGE-STAIRWELL WATERPROOFING - - - 50,000 - - - 50,000 60723 7TH ST GARAGE-TRAFFIC COATING - - - - 150,000 - - 150,000 60724 42ND STREET GARAGE-FIRE SPRINKLER - - - - - 40,000 - 40,000 60822 1755 MERIDIAN GARAGE LED LIGHTING - - - 150,000 - - - 150,000 60823 PENN GARAGE-FIRE SPRINKLER RENEWAL - - - - 300,000 - - 300,000 60922 SUNSET HARBOUR GARAGE SEALING - - - 75,000 - - - 75,000 60923 PENN GARAGE-FIRE PUMP REPLACEMENT - - - - 100,000 - - 100,000 61017 ANCHOR GARAGE LIGHTING 277,219 - - - - - - 277.219 61021 MB POLICE GARAGE CONCRETE SPALLING - 800,000 - - - - 800,000 61022 SUNSET HARBOUR GRGE-TRAFFIC COATING - - - 300,000 - - - 300,000 61023 PENN GARAGE-FIRE ALARM SYSTEM - - - - 35,000 - - 35,000 61118 7TH STREET GARAGE UPGRADE LIGHTING 200,000 - - - - - - 200,000 61123 12TH ST GARAGE-STAIRWELL DOOR - - - - 32,000 - - 32,000 61217 13TH ST.GARAGE-WINDOW/GLASS BLOCK - - 30,000 - - - - 30,000 61218 7TH STREET PARKING GARAGE ROOF TOP 30,000 - - - - - - 30,000 61223 12TH ST.GARAGE-STAIRWELL RAILING - - - - 25,000 - - 25,000 61317 13TH ST.GARAGE-STAIRWELL RAILING - - 25,000 - - - - 25,000 61323 42ND ST GARAGE-WATER DISTRIBUTION - - - - 75,000 - - 75,000 61417 17TH ST GRGE INT.FLOOR DRAINAGE - - 30,000 - - - - 30,000 61423 1755 GARAGE FIRE PUMP REPLACEMENT - - - - 100,000 - - 100,000 CITY OF MIAMI BEACH ATTACHMENT 8 i\VA 1 A/M\ I B E AC H FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY PROGRAM PROJECT PROGRAM Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 61517 17 ST GRGE-STORAGE SPACE RENOVATION - - - 100,000 - - - 100,000 61617 17TH ST GARAGE WATER DISTRIBUTION - - - - 75,000 - - 75,000 61623 SUNSET HARBOUR GARAGE-FIRE ALARM - - - - 35,000 - - 35,000 61660 13TH STREET PARKING GARAGE ELEVATOR 184,800 140,500 - - - - - 325,300 61717 42ND ST.GARAGE-50YR CERTIFICATION - - 300,000 - - - - 300,000 61718 16TH STREET GARAGE FIRE SPRINKLER 300,000 - - - - - - 300,000 61817 42ND ST.GARAGE-STAIRWELL RAILING - - 25,000 - - - - 25,000 61818 16TH STREET GARAGE STAIRWAYS 30,000 - - - - - - 30,000 61917 1755 MERIDIAN GARAGE FLOOR DRAINAGE - - 200,000 - - - - 200,000 61918 16TH STREET GARAGE ROOF AND DECK 1,808,000 - - - - - - 1,808,000 61930 17TH STREET PARKING GARAGE ELEVATOR 876,000 - - - - - - 876,000 62017 SUNSET HARBOUR GARAGE LED LIGHTING - - 300,000 - - - - 300,000 62100 42ND ST.PARKING GARAGE MAINTENANCE 400,000 - - - - - - 400,000 62218 13TH STREET GARAGE LIGHTING(LED) 86,000 - - - - - - 86,000 62418 12TH STREET GARAGE ROOF AND DECK 598,806 - - - - - - 598,806 62518 1755 MERIDIAN GARAGE ROOF AND DECK 1,900,000 - - - - - - 1,900,000 62621 7TH STREET GARAGE-OFFICE/RESTROOM - - 30,000 - - - - 30,000 62721 16TH STREET GARAGE-OFFICE/RESTROOM - - 30,000 - - - - • 30,000 62821 16TH STREET GARAGE-ROOF TOP RENEWAL - - 25,000 - - - - 25,000 62921 PENN GARAGE-LIGHTING RENEWAL - - 200,000 - - - - 200,000 63021 PENN GARAGE-HVAC RENEWAL - - 50,000 - 35,000 - 35,000 120,000 63121 PENN GARAGE-TRAFFIC COATING-RETAIL - - 40,000 - - - - 40,000 63221 12TH STREET GARAGE-DOMESTIC WATER - - 75,000 - - - - 75,000 63321 13TH STREET GARAGE-40YR CERT. - - 300,000 - - - - 300,000 64018 17TH ST GARAGE 40YR RECERTIFICATION 755,427 - - - - - - 755,427 64319 PENN GARAGE-NEW LIGHTING DISPLAY 135,000 - - - - - - 135,000 64419 13TH STREET GARAGE-WATER SYSTEM 33,000 - - - - - - 33,000 - 64519 17TH STREET GARAGE-1ST FL OFFICE 45,000 - - - - - - 45,000 64719 7TH STREET GARAGE-DOOR REPLACEMENT 50,000 - - - - - - 50,000 65019 16TH STREET GARAGE(ANCHOR)-PAINT 100,000 - - - - - - 100,000 67118 ANCHOR-INTERIOR FLOOR DRAINAGE - 30,000 - - - - - 30,000 67218 PENN GRGE-SEALING OF SUPERSTRUCTURE - 25,000 - - - - - 25,000 67318 PENN GARAGE-INT.SURFACE RESTORATION - 95,000 - - - - - 95,000 67418 42ND STREET GARAGE-DISPATCH AREA - 100,000 - - - - - 100,000 67618 12TH STREET GARAGE-ROOF RENEWAL - 64,000 - - - - - 64,000 67718 17TH STREET GARAGE-ROOFING REPAIRS - 30,000 - - - - - 30,000 67818 17 ST GARAGE-GENERATOR REPLACEMENT - 120,000 - - - - - 120,000 68018 42ND STREET GARAGE-GENERATOR - 71,000 - - - - - 71,000 68118 42ND ST GARAGE-INTERIOR DRAINAGE - 34,000 - - - - - 34,000 AA I AMI EAC IM CITY MIAMI BEACH FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY PROGRAM ATTACHMENT B PROJECT PROGRAM Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 68220 7TH ST GARAGE SURFACE RESTORATION - 95,000 - - - - - 95,000 69310 7TH ST.GARAGE FIRE ALARM SYSTEM 51,087 - - - - - - 51,087 69370 42ND ST.GARAGE FIRE ALARM SYSTEM 51,087 - - - - - - 51,087 69380 42ND ST GARAGE ELEVATOR REPLACEMENT 705,645 (140,500) - - - - - 565,145 14,511,546 1,144,000 3,710,000 1,430,000 1,662,000 1,785,000 2,525,000 26,787,546 TOTAL: 62,466,6601 12,683,000, 3,710,0001 1,430,0001 1,662,0001 1,785,0001 12,525,0001 96,261,660 PARKING LOTS CAPITAL IMPROVEMENT PROGRAM 20518 SURFACE LOT AT BISCAYNE BEACH 600,000 - - - 600,000 26340 PENRODS AT 1 OCEAN DR.PARKING LOT 3,000,650 - - - - - - 3,000,650 27480 SURFACE LOT P48 BASS MUSEUM LOT 220,000 - - - - - - 220,000 29580 LOT 9D P86-6976 INDIAN CREEK DRIVE 659,000 - - - - - - 659,000 4,479,650 - -- - - - 4,479,650'; PROPERTY MANAGEMENT 28710 P14 6TH ST&COLLINS PARKING LOT 150,000 - - - - 150,000 60317 CITYWIDE PARKING LOTS IMPROVEMENTS - 150,000 150,000 150,000 150,000 150,000 - 750,000 66218 FLEET MANAGEMENT PARKING LOT - - 500,000 - - - - 500,000 68218 CITYWIDE PARKING LOTS-SEAL COATING 100.000 - - - 100,000 150,000 250,000 650,000 150,000 150,000 150,000 - 1,500,000 TOTAL: 4,629,650 250,000 650,000 150,000 150,000 150,000 - 5,979,650 PARKS CAPITAL IMPROVEMENT PROGRAM 20137 MUSS PARK PLAYGROUND&IMPROVEMENTS 345,000 - - 345,000 20237 FAIRWAY DRAINAGE AND PLAYGROUND 1,272,000 - 670,000 - - - - 1,942,000 20257 MIAMI BEACH TENNIS CENTER PROSHOP 627,000 - - - - - 627,000 20300 NORMANDY ISLE PARK TURF REPLACEMENT 398,000 - - - - - - 398,000 20418 COLLINS PARK PERFORMING ARTS VENUE 975,000 - - - - - - 975,000 20918 BRITTANY BAY PARK 1,243,000 - - - - - - 1,243,000 22750 ALTOS DEL MAR PARK 4,995,492 - - - - - - 4,995,492 23200 FLAMINGO PARK 17,923,130 - - - - - - 17,923,130 23418 POCKET PARK AT 20TH ST.&SUNSET DR 935,000 - - - - - - 935,000 23518 BATTING CAGES AT NORTH SHORE PARK 250,000 - - - - - - 250,000 25019 GO#1:72ND ST.RECREATION CENTER 10,800,000 - - 43,000,000 - - - 53,800,000 25380 BAND SHELL MASTER PLAN 2,633,372 - - - - - - 2,633,372 25419 GO#5:FLAMINGO PARK&YOUTH CENTER 15,400,000 - - - - - 15,150,000 30,550,000 26500 KAYAK LAUNCH DOCKS 713,080 - - - - - - 713,080 26719 GO#23:BAYWLK PEDESTRIAN BRIDGE 10,000,000 - - 5,000,000 - - - 15,000,000 26819 GO#24:MIDDLE BEACH BEACHWLK 4,500,000 - - - - - - 4,500,000 27930 SHARED PATH ON PARKVIEW ISLAND PARK 320,000 - - - - - - 320,000 CITY OF MIAMI BEACH \A ATTACHMENT B FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY PROGRAM PROJECT PROGRAM Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 27950 NORTH BEACH OCEANSIDE PARK 8,660,000 1,250,000 - - - - 9,910,000 28550 LIFEGUARD STAND REPLACEMENTS 3,319,989 - - - - - - 3,319,989 28850 MAURICE GIBB PARK REDESIGN 2,628,682 - - - - - - 2,628,682 29430 SOUTH POINTE PARK REMEDIATION 9,241,881 - - - - - - 9,241,881 29600 MUSS PARK FACILITY 2,695,000 - - - - - 2,695,000 29620 ALLISON PARK REDESIGN 1,532,000 - - - - - - 1,532,000 101,407,626' 1,250,000 670,000 48,000,400 - 15,150,000 168,477,826' PARKS AND R CREA'�{ON 0, 1:::7"'"'''''..:;,:;"Y .�i. ' ,,i.. , 1 , 1, ,- .?-)'' ',:,-0,-,-4, ra, , '4g,',. - 20023 ALLISON PARK PLAYGROUND REPLACEMENT - - - - - - 625,000 625,000 20123 INDIAN BCH PK PLAYGROUND EXPANSION - 168,090 84,910 - - - - 253,000 20187 LUMMUS PARK MUSCLE BEACH UPGRADE 300,000 - - - - - - 300,000 20190 NORMANDY SHORES PK FITNESS CIRCUIT 311,500 - - - - - - 311,500 20223 LUMMUS PARK PLAYGROUND REPLACEMENT - - - - - - 450,000 450,000 20247 CITYWIDE PARKS IRRIGATION SYSTEM 170,000 - - - - 170,000 20321 BEACHVIEW PK PLAYGROUND REPLACEMENT - - - 511,000 - - - 511,000 20423 FLAMINGO PK FOOTBALL FENCE - - - - 450,000 - - 450,000 20425 FLAMINGO PARK SOCCER FIELD TURF - - - - - - 275,000 275,000 20523 STILLWATER PARK LIGHTING&SOCCER - - - 475,000 - - 475,000 20577 BELLE ISLE PARK PLAYGROUND 576,500 - - - - - - 576,500 20722 FLAMINGO PK PLAYGROUND REPLACEMENT - - - 750,000 - - - 750,000 20723 CRESPI PARK LIGHTING&MICRO SOCCER - - - - 468,500 - - 468,500 20821 BISCAYNE ELEM SHARED FIELD LIGHTING - - 1,270,170 - - - - 1,270,170 20822 FLAMINGO PK FOOTBALL STADIUM TURF - - - 425,000 - - - 425,000 20921 NORMANDY ISLE PARK PLAYGROUND - - 480,000 - - - - 480,000 21021 NSPYC KITCHEN&CABINETRY ADDITION - - 350,000 - - - - 350,000 21022 WEST LOTS 85-86 ST CONVERSION - - - 2,436,100 - - - 2,436,100 22420 POLO PARK LIGHTING&SOCCER FIELD - 857,680 - - - - - 857,680 23018 SOUTH POINTE PARK LIGHTING 585,000 - - - - - - - 585,000 24790 PARK VIEW ISLAND 447,838 - - - - - - 447,838 25119 GO#2:COLLINS PARK 640,000 - - - - - - 640,000 25219 GO#3:CRESPI PARK 211,000 - - - - - - 211,000 25319 GO#4:FAIRWAY PARK 260,000 - - - - - 260,000 25519 GO#6:FISHER PARK - - - - - - 105,000 105,000 25619 GO#7:LA GORGE PARK - - - - - - 150,000 150,000 25719 GO#8:LUMMUS PARK 4,737,000 - - - - - - 4,737,000 25819 GO#9:M.S.D.PARK 682,000 - - - - - - 682,000 25919 GO#10:MAURICE GIBB PARK 3,300,000 - - - - - - 3,300,000 26019 GO#11:MUSS PARK - - - - - - 250,000 250,000 26119 GO#12:NOBE OCEANSIDE PARK BEACHWLK 2,000,000 - - - - - - 2,000,000 1 j I I M I EAC A C CITY IM MIAMI BEACH ATTACHMENT B !f 1Vf�t !/tel I/'`1 FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY PROGRAM PROJECT PROGRAM Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 26219 GO#13:N.SHORE PARK&YOUTH CENTER 4,930,000 - - 795,000 - - - 5,725,000 26319 GO#15:PAR 3/COMMUNITY PARK 15,700,000 - - - - - - 15,700,000 26419 GO#17:POLO PARK 500,000 - - - - - - 500,000 26519 GO#18:SCOTT RAKOW YOUTH CENTER 4,448,000 - - 640,000 - - - 5,088,000 27219 00#30:SKATE PARK - - - - - - 750,000 750,000 27540 SOUTH POINTE PARK IMPROVEMENTS 184,000 - - - - - - 184,000 28410 SCOTT RAKOW PLAYGROUND 175,742 - - - - - - 175,742 28560 COLLINS PK LIGHTING SOUND SYSTEM 236,000 - - - - - - 236,000 29550 CMB SKATEPARK 190,280 - - - - - - 190,280 60123 CRESPI PARK PLAYGROUND REPLACEMENT - - - - - 400,000 - 400,000 60223 POLO PARK PLAYGROUND REPLACEMENT - - - - - 450,000 - 450,000 60321 CITYWIDE PARKS COURT REPAIRS - 80,000 100,000 100,000 100,000 100,000 480,000 60323 STILLWATER PLAYGROUND REPLACEMENT - - - - 570,000 - - 570,000 60421 CITYWIDE FITNESS COURSE REPLACEMENT - - 100,000 100,000 100,000 100,000 100,000 500,000 60720 BEACHWALK TREE WELLS 14-22 STREET) - 150,000 - - - - - 150,000 63119 BELLE ISLE PARK BERMUDA GRASS 40,000 - - - - - - 40,000 63219 FLAMINGO PK IRRIGATION BASEBAL 86,000 - - - - - - 86,000 63319 PARK VIEW ISLAND ANNEX-DOG PARK 67,000 - - - - - - 67,000 63419 FLAMINGO PARK BASEBALL OUTFIELD NET 129,000 - - - - - - 129,000 63519 BUOY PARK REFORESTATION IMPROVEMENT 150,000 - - - - - - 150,000 63619 NORMANDY SHORES SHADE STRUCTURE 44,000 - - - - - - 44,000 65620 NORTH BEACH OCEANSIDE PK SECURITY 225,000 - - - - - - 225,000 66518 SECURITY AUDIO SYSTEM FOR ALL POOLS - - 100,000 - - - - 100,000 66920 S.P.PARK-FISHING PIER RAILING REP - - 500,000 - - - - 500,000 67300 SRYC-RECEPTION&BOWLING AREA 66,000 - - - - - - 66,000 67519 GO#14:PALM ISLAND PARK - - - 231,000 - - - 231,000 67619 GO#16:PINETREE PARK - - - 700,000 - - - 700,000 67719 GO#20:SOUTH POINTE PARK - - - - - - 480,000 480,000 67819 GO#21:STILLWATER PARK 145,000 - - - - - - 145,000 67919 GO#22:TATUM PARK - - - - - - 840,000 840,000 69020 SUPER BOWL ENHANCEMENTS LUMMUS PK - 250,000 - - - - 250,000 41,536,860 1,425,770 2,965,080 6,688,100 2,163,500 1,050,000 4,125,000 59,954,310 PROPERTY MANAGEMENT 26919 GG 27.LOG CABIN - - - 1,076.000 - - - 1,076,000 PW ENGINEERING 270,1C L1AURICE GIEB PARK FLOATING DOCK 550,006 - - - - - - 550,000 TOURISM CULTURAL DEVELOPMENT ,'.:,c/ 0O_uNO5CAPEPARK 48,590 - - - - - - 48,590 23318 SOUNDSCAPE AUDIO IMPROVEMENTS 751,410 - - - - - - 751,410 • MtEAC CITYMIAMI BEACH ATTACHMENT B IAFY 2020-2024 CAPITALAL IMPROVEMENT PLAN BY PROGRAM PROJECT PROGRAM Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 26619 GO#19:SOUNDSCAPE PARK 4,500,000 - - - - 4,500,000 27119 GO#29:WEST LOTS 1,000,000 2.000.000 - - 2,000.000 5.000.000 6,300,000 - 2,000,000 - - 2,000,000 10,300,000 TOTAL: 149,794,486 2,675,770 3,635,080 57,764,100 2,163,500 1,050,000 21,275,000 238,357,936 RENEWAL&REPLACEMENT ENVIRONMENT SUSTAINABILITY 60011 IRRIGATION SYSTEM MACAR I HUR CAUSEWAY - - - 28,000 - - - ' 28,000. HOUSING COMMUNITY SERVICES 60657 NEPTUNE APARTMENTS REPAIRS 991,934 - - - - - - 991,934 62618 MADELEINE VILLAGE 549,105 - - - - 549,105 1,541,039 - - - - - - 1,541,039 ', {1t1P RECREATION 60022 FLAMINGO PARK NORTH-SOUTH WALKWAY - - 300,000 - - 300,000 60121 BEACHVIEW FITNESS COURSE REPLACEMENT - 80,000 - - - 80,000 60122 SOUNDSCAPE PK LED LIGHTING - - 75,000 - - - 75,000 60137 PALM ISLAND TENNIS COURT LIGHTING 44,000 - - - - - 44,000 60322 PARKS MAINT.FACILITY RENOVATIONS - - - 300,000 - - - 300,000 60367 INDIAN BEACH PLAYGROUND REPLACEMENT 229,000 - - - - - - 229,000 60523 FLAMINGO FOOTBALL STADIUM RAILINGS - - - - 100,000 - - 100,000 61219 N.SHORE TENNIS FACILITY FENCE 47,000 - - - - - - 47,000 61319 N.SHORE BANDSHELL PLUMBING REPAIRS 30,000 - .. - - - - 30,000 62718 N.BEACH PARKS RESTROOM RESTORATION 190,000 - - - - - - 190,000 63080 BEACH RESTROOMS PAINT AND CONCRETE 240,275 - - - - 240,275 63218 MID BEACH PARK RESTROOM RESTORATION 80,000 - - - - - - 80,000 63318 NORMANDY ISLE PARK POOL RENOVATIONS 375,000 - - - - - - 375,000 66022 SOUTH POINTE PARK SPLASH PAD - - - - 250,000 - - 250,000 66318 PARKS RESTROOM IMPROVEMNTS - - 260,000 200,000 - - - 460,000 66418 FLAMINGO POOL DECK&PUMP ROOM - - 250,000 - - - - 250,000 67040 NORMANDY ISLE PARK&POOL 200,000 - - - - - 200,000 67120 SOUNDSCAPE PARK IMPROVEMENTS 28,000 - - - - - - 28,000 67280 NEIGHBORHOOD BASKETBALL COURTS 137,000 - - - - - - 137,000 67320 NEIGHBORHOOD TENNIS COURT RENOVATION 92,000 - - - - - 92,000 67420 FLAMINGO PARK POOL PLAYGROUND 245,584 - - - - - 245,584 68919 GO#52:LED LIGHTING IN PARKS 1,041,000 - 3,459,000 - - - 4,500,000 2,978,859 - 510,000 4,114,000 650,000 - - 8,252,859 'PROPER7YMARAGEMENT 20110 28TH STREET OBELISK STABILIZATION 631,780 631,780 25980 BASS MUSEUM GENERATOR 117,816 - - - - - - 117,816 26010 BASS MUSEUM HYDRAULIC ELEVATOR 66,127 - - - - - - 66,127 CITY OF MIAMI BEACH A �\ B FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY PROGRAM ATTACHMENT B PROJECT PROGRAM Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 27780 MIAMI CITY BALLET WINDOWS 441,799 - - - - - - 441,799 27970 BEACH SHOWER DRAINAGE SYSTEM 466,000 - - - - - - 466,000 28919 GO#26:ROOFS FOR CULTURAL FACIL. 2,980,000 - - - - - - 2,980,000 60030 POLICE STATION MEN'S LOCKER ROOM 228,871 - - - - - - 228,871 60037 SCOTT RAKOW FIRE ALARM RENEWAL 71 - - - - - - 71 60038 SOUTH SHORE C.C.FIRE ALARM RENEWAL 112,086 - - - - - - 112,086 60047 POLICE STATION EMERGENCY LIGHTING 27,245 - - - - - - 27,245 60077 FIRE STATION 2 ALARM SYSTEM 89,000 - - - - - - 89,000 60087 SCOTT RAKOW CENTER SECURITY SYSTEM 53,440 - - - - - - 53,440 60118 POLICE STATION BACKUP CHILLER 151,000 - - - - - - 151,000 60125 1755 MERIDIAN GARAGE OFFICE ROOF - - - - - - 300,000 300,000 60218 STORAGE TANK REPLACEMENT 4,300 - - - - - - 4,300 60220 UNIDAD BUILDING-ROOF REPLACEMENT - 80,000 - - - - - 80,000 60225 SUNSET HARBOUR GARAGE INT.FLOOR - - - - - - 34,000 34,000 60318 SCOTT RAKOW YOUTH CENTER GENERATOR 16,863 - - - - - - 16,863 60418 HISTORIC CITY HALL HUMIDITY CONTROL 98,068 - - - - - - 98,068 60420 FIRE STATION 2-NC REPLACEMENT - - 105,000 - - - - 105,000 60519 CITY HALL 40-YR STRUCTURAL 100,000 - - - - - - 100,000 60520 MBPD-CONDENSER AND PUMPS - - 125,000 - - - - 125,000 60618 HISTORIC CITY HALL FIRE ALARM 151,618 - - - - - - 151,618 60619 MBPD-COOLING TOWER BASE REPAIR 150,000 - - - - - - 150,000 60637 COLONY THEATER HVAC REPLACEMENT 228,000 - - - - - - 228,000 60718 NORTH SHORE PARK YOUTH CENTER NC 90,000 - - - - - - 90,000 60719 UNIDAD ELEVATOR MODERNIZATION 70,000 - - - - - - 70,000 60819 777 BUILDING-ROOF RESTORATION 62,000 - - - - - - 62,000 60821 CITY HALL-REPLACE RESTROOM EXHAUST - - 35,000 - - - - 35,000 60919 SSCC BATHROOM AND KITCHEN UPGRADE 150,000 - - - - - - 150,000 60920 HISTORIC CITY HALL-VFD REPLACEMENT - 200,000 - - - - - 200,000 61018 FIRE STATION 3 KITCHEN RENEWAL 20,683 - - - - - - 20,683 61020 CITY HALL-GENERATOR REPLACEMENT - 600,000 - - - - - 600,000 61100 P.A.L.BUILDING-FIRE ALARM 95,000 - - - - - - 95,000 61119 SSCC PLAYGROUND AREA MITIGATION 85,000 - - - - - - 85,000 61120 CITY HALL-COOLING TOWER BASE - 100,000 - - - - - 100,000 61121 SCOTT RAKOW YOUTH CENTER-KITCHEN - - 150,000 - - - - 150,000 61221 NORM.ISLE POOL LOCKER ROOM&PUMPS - - 250,000 - - - - 250,000 61290 CITY HALL FIRE ALARM SYSTEM 314,325 - - - - - - 314,325 61320 UNIDAD BUILDING-DOOR RENEWAL - - - 40,000 - - - - 40,000 61321 71ST STREET WELCOME SIGN RENOVATION - - 40,000 - - - - 40,000 61419 BEACHFRONT RESTROOMS-RENOVATIONS 158,000 - - - - - - 158,000 CITY OF MIAMI BEACH ATTACHMENT B A �1�/ FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY PROGRAM PROJECT PROGRAM Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 61420 UNIDAD BUILDING-WINDOW SEAL RENEWAL - - 40,000 - - - - 40,000 61421 CITY HALL WATER FOUNTAIN - - 32,000 - - - - 32,000 61518 PUMP STATION 28 FUEL STORAGE TANK 108,623 - - - - - - 108,623 61519 BEACH SHOWER DRAINAGE SYSTEM PH II 300,000 - - - - - - 300,000 61520 FIRE STATION 2 KITCHEN REPLACEMENT 35,000 - - - - - - 35,000 61521 CITY HALL LOADING DOCK RESURFACING - - 70,000 - - - 70,000 - 61523 SUNSET HARBOUR GARAGE FIRE PUMP - - - - 100,000 - - 100,000 61618 PUMP STATION 29 FUEL STORAGE TANK 89,160 - - - - - - 89,160 61621 CITY HALL CHAMBER ACOUSTICAL FLOOR - - 60,000 - - - - 60,000 61721 CITY HALL CHAMBER FF&E RENEWAL - - 105,000 - - - - 105,000 61819 BEACHWALK DRAINAGE-24 ST TO 46 ST 100,000 - - - - - - 100,000 61821 C.H.CHAMBER ACOUSTICAL WALL CARPET - - 212,000 - - - - 212,000 61919 41ST STREET FOUNTAIN RESTORATION 82,000 - - - - - - 82,000 61921 10TH ST.AUDIT.ENTRANCE DRAINAGE - - 250,000 - - - - 250,000 62021 COLONY THEATER ELEVATOR - - 75,000 - - - - 75,000 62117 FIRE STATION#2 TRAINING TOWER - - 320,000 - - - - 320,000 62118 12TH STREET PARKING LIGHTING(LED) 64,000 - - - - - - 64,000 62119 BASS MUSEUM-ROOF REPLACEMENT 397,000 - - - - - - 397,000 62121 BOTANICAL GARDENS RESTROOMS - - 50,000 - - - - 50,000 62130 HVAC CONTROLS REPLACEMENT FLEET 42,000 - - - - - - 42,000 62217 10TH ST AUDITORIUM COATING OF ROOF - - 60,000 - - - - 60,000 62219 FILLMORE-SIGNAGE REPLACEMENT 87,000 - - - - - - 87,000 62221 COLONY THEATER RESTROOM RENOVATION - - 50,000 - - - - 50,000 62319 BOTANICAL GARDENS-ROOF REPAIRS 50,000 - - - - - - 50,000 62321 COLONY THEATER EXTERIOR PAINTING - - 80,000 - - - - 80,000 62410 SOUTH SHORE COMMUNITY CTR FLOORING 105,494 - - - - - - 105,494 62419 BASS MUSEUM-FREIGHT ELEVATOR 100,000 - - - - - - 100,000 62421 COLONY THEATER LED LIGHTS UPGRADE - - 40,000 - - - - • 40,000 62519 BEACHWALK DRAINAGE-S.POINTE-23 ST 220,000 - - - - - - 220,000 62818 FIRE STATION 2 GARAGE DOOR 178,962 - - - - - - 178,962 62820 P.A.L.BUILDING-ROOF REPAIRS - 90,000 - - - - - 90,000 62920 FIRE STATION#2 WATERPROOFING - 192,000 - - - - 192,000 63019 BUILDOUT 1701 4TH FL FOR HOUSING 100,000 - - - - - - 100,000 63020 GARAGE DOOR AT FIRE STATION 4 - - 30,000 - - - - 30,000 63350 POLICE HQ ELEVATORS&OTHER PROJECT 396,798 - - - - - - 396,798 63420 NS YOUTH CNTR ROOFTOP A/C RENEWAL - - 125,000 - - - - 125,000 63520 MBPD NORTH SUB STN-ROOF HARDENING - - 200,000 - - - - 200,000 63620 CITY HALL CHILLED&CONDENSER PUMPS - - 50,000 - - - - 50,000 63718 SANITATION INTERIOR REPLACEMENT 475,000 - - - - - - 475,000 A. CITY OF MIAMI BEACH ATTACHMENT B *x'44 ` �h FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY PROGRAM PROJECT PROGRAM Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 63719 1755 MERIDIAN-CHILLER REPLACEMENT 107,000 - - - - - - 107,000 63720 10TH ST AUDITORIUM-LOUVER - - 50,000 - - - - 50,000 63770 FY 08 FIRE STATION 1 356,275 - - - - - - 356,275 63819 SSCC ROOT MITIGATION&FLOORING REP 65,000 - - - - - - 65,000 63918 PUBLIC WORKS FACILITY RENOVATION 208,001 - - - - - - 208,001 63919 SMART CARD ACCESS SYSTEM-PHASE I 250,000 - - - - - - 250,000 64019 CITY HALL ENERGY EFFICIENT BUILDING 156,000 - - - - - - 156,000 64020 CITY HALL CARD ACCESS SYSTEM REPLAC 80,436 - - - - - • 80,436 64220 PUBLIC WORKS FACILITY EXTERIOR 84,914 - - - - - - 84,914 64320 CITY HALL-COOLING TOWER CONDENSER - 90,000 - - - - - 90,000 64418 THE FILLMORE 40-YR RECERTIFICATION 654,734 - - - - - - 654,734 64420 CITY HALL RESTROOM RENOVATIONS - - 250,000 - - - - 250,000 64618 MIAMI CITY BALLET VARIOUS REPAIRS 278,250 - - - - - - 278,250 64619 SURFACE LOTS CITYWIDE LANDSCAPING 100,000 - - - - - - 100,000 64720 FIRE STATION 2 EXT PAINT&LIGHTING - - 55,000 - - - - 55,000 64819 COLONY THEATER-FIRE ALARM SYSTEM 78,000 - - - - - - 78,000 64919 FILLMORE-SITE LIGHTING RENOVATION 60,000 - - - - - - 60,000 65118 BASS MUSEUM-FIRE PUMP REPLACEMENT 72,000 - - - - - - 72,000 65218 PURDY AVE BOAT RAMP REPAIRS 421,133 - - - - - - 421,133 65219 SOUTH POINTE PARK HVAC REPLACEMENT 75,000 - - - - - - 75,000 65318 BOTANICAL GARDEN HVAC REPLACEMENTS 70,000 - - - - - - 70,000 65319 CODE/HOUSING OFFICES RELOCATION 530,000 - - - - - - 530,000 65320 UNIDAD INTERIOR&EXTERIOR PAINTING - - 89,000 - - - - 89,000 65420 MBPD NORTH SUB STATION PARKING LOT - - 230,000 - - - - 230,000 65520 MBPD N SUB STN PAINTING,FLOORING - - 234,000 - - - - 234,000 65618 FLEET MANAGEMENT STAIRS RESTORATION - - 35,000 - - - - 35,000 65718 FLEET MANAGEMENT WAREHOUSE CEILING - - 30,000 - - - - 30,000 65720 HISTORIC CH-ROOF ACCESS LADDER - - - 100,000 - - - 100,000 65818 FLEET MANAGEMENT FIRE SPRINKLER - - 250,000 - - - - 250,000 65918 FLEET MANAGEMENT LED LIGHTING - - 150,000 - - - - 150,000 65920 MBFD STATIONS SECURITY UPGRADES CW - - - - 126,000 - - 126,000 66018 FLEET MANAGEMENT CONCRETE SPALLING - - 100,000 - - - - 100,000 66020 CITY HALL-MAIN ENTRANCE PAVERS - - 152,000 - - - - 152,000 66118 FLEET MANAGEMENT BAYS PAINTING - - 120,000 - - - - 120,000 66120 LINCOLN RD STONE RESTORATION - 368,000 - - - - - 368,000 66220 HISTORIC CITY HALL ELEVATOR - 350,000 - - - - - 350,000 66618 SOUTH POINTE PK-FIRE ALARM RENEWAL - 35,000 - - - - - 35,000 66620 FILLMORE-SITE LIGHTING PHASE II - - 50,000 - - - - 50,000 66718 BEACH STORAGE AREA ENCLOSURE - 170,000 - - - - - 170,000 I A 1 tj\}A I B EAC IM CITY MIAMI BEACH ATTACHMENT B FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY PROGRAM PROJECT PROGRAM Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 66818 WATER STATION ROOF REPLACEMENT - 30,000 - - - - - 30,000 66820 BASS MUSEUM-OFFICE FLOORING - - 44,000 - - - - 44,000 66918 ANCHOR GAR.-FIRE ALARM REPLACEMENT - 120,000 - - - - - 120,000 67018 ANCHOR GARAGE-STAIRWELL DOORS - 27,000 - - - - - 27,000 67030 MARINE PATROL EXTERIOR RESTORATION 68,100 - - - - - - 68,100 67200 FIRE STATION 3 FIRE ALARM UPGRADE 55,000 - - - - - - 55,000 67210 CITY HALL ROOF&SKYLIGHT 200,000 - - - - - - • 200,000 67220 FIRE STATION 3 EMERGENCY GENERATOR 95,000 - - - - - - 95,000 67240 777 BUILDING HVAC 4TH FLOOR 170,000 - - - - - - 170,000 67360 BASS MUSEUM EMERGENCY GENERATOR 150,000 - - - - - - 150,000 67370 COLLINS AVE BOARDWALK REPLACEMENT 150,000 - - - - - - 150,000 67518 1755 MERIDIAN AVE OFFICE SECURITY - 35,000 - - - - - 35,000 68020 PARK RANGER HEADQUARTER RENOVATION - - - - 475,000 - - 475,000 68519 GO#48:POLICE HQ FACILITY 4,000,000 - - - - - 6,000,000 10,000,000 68520 FS 3-INTERIOR&OVERHEAD DOOR REPLACE 107,678 - - - - - - 107,678 68720 POLICE HO&PARKING GARAGE-FIRE ALA 222,033 - - - - - - 222,033 68760 CITY HALL ELECTRICAL UPGRADES 341,500 - - - - - - 341,500 68820 BEACH RESTROOMS EXHAUST SYSTEMS - 35,000 - - - - - 35,000 69220 PUBLIC WORKS FACILITY GENERATOR 382,377 - - - - - - 382,377 69470 FLEET/SANITATION FIRE ALARM SYSTEM 85,800 - - - - - - 85,800 69480 MARINE PATROL EMERGENCY GENERATOR 104,515 - - - - - - 104,515 69960 SOUTH SHORE COMMUNITY ELEVATOR 169,934 - - - - - 169,934 20,038,809 2,522,000 4,433,000 100,000 701,000 • 6,334,000 34,128,809 PW ENGINEERING 64210 SIDEWALK ASSESSMENT SURVEY 75,000 - - - - - - 75000 PW GREENSPACE MANAGEMENT 65120 GREENSPACE FACILITY SECURITY SYSTEM - - 110,000 - - - - 110,000 66520 SOUTH BEACH ROW LANDSCAPE - 280,000 100,000 100,000 100.000 100,000 - 680,000 - 280,000 210,000 100,000 100,000 100,000 - 790,000 UMU M CULTURN.,DAVELOPMENT 64219 CARL FISHER COMMERCIAL KITCHEN 214 950 - - 244-950 65220 MIAMI CITY BALLET STUDIO FLOORING 144000 - - • - - 140.000 244,950 140,000 - - - - - 384,950 TOTAL: 24,878,6571 2,942,0001 5,153,000 1 4,342,0001 1,451,0001 100,0001 0,334,0001 45,200,657 SEAWALLS CAPITAL IMPROVEMENT PROGRAM 25940 SEAWALL REPAIR-FLEET MANAGEMENT 2,565,631 - - - - - - 2,565,631 27610 SEAWALL MUSS PARK REHABILITAION 1.182.423 - - - - 1,182,423 3.748,054 - - - - - - 3,748,054 ENVIRONMENT SUSTAINABILITY I IM CITY MIAMI BEACH ATTACHMENT B FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY PROGRAM PROJECT PROGRAM Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 27919 GO#39:SEAWALLS&SHORELINES 8,000 010 - - 2000,000 - - 10,000,000 WA[MtNISTRATK)N, 20220 SEAWALL-DICKENS AV SHORELINE 435,394 - - - 435.394 28300 SHANE WATERSPORT SEAWALL 784,000 784,000 29560 BRITTANY BAY PARK SEAWALL 1,109,000 1,109,000 2,328,394 - _ 2,328,394 P EN0 NE '4 '' 20567 MAURICE GIBB PARK SEAWALL 321,164 - - 321,164 21240 CHEROKEE AVE SOUTH END SEAWALL 140,000 - - - - 140,000 23618 LENOX COURT&JEFFERSON AVE SEAWALL 300,000 - - - 300,000 27170 SEAWALL-BISCAYNE BAY ST END PH.II 1,694,058 - - - - .. 1,694,058 27600 SEAWALL-BOTANICAL GARDEN 1,208,662 - - - - - - 1,208,662 28730 SEAWALL-LINCOLN COURT 548,000 - - - - - 548,000 28740 SEAWALL-HOLOCAUST MEMORIAL 100,000 - - - - - 100,000 28770 COLLINS CANAL CONVENTION CENTER 97,150 - - - - - - 97,150 28780 SEAWALL DADE BLVD-WASHINGTON AVE 1,625,000 - - - - - 1,625,000 28790 CONVENTION CENTER DR TO WASHINGTON 1,800,000 - - - - - - 1,800,000 28820 INDIAN BEACH PARK SEAWALL 715,000 - - - - - 715,000 28830 NORMANDY SHORES PARK SEAWALL 226,000 - - - - - - 226,000 29020 CITYWIDE SEAWALL REHAB - 5,000,000 5,000,000 5,000,000 5,000,000 5,000,000 - 25,000,000 29500 COLLINS CANAL ENHANCEMENT PROJECT 5,458,889 - - - - 5,458,889 14,233,923 5,000,000 5,000,000 5,000,000 5,000,000 5,000,000 - 39,233,923 TOTAL: 28,310,371 5,000,000 5,000,000 7,000,000 5,000,000 5,000,000 - 55,310,371 STREETS/SIDEWALKS/STREETSCAPEs CAPITAL IMPROVEMENT PROGRAM - T ,y1 ;:, , ° 20330 MIDDLE BEACH REC CORRIDOR PH II 12,065,517 - - - - 12,065,517 20597 WEST AVENUE PHASE II 79,158,564 - - - - - - 79,158,564 21118 STILLWATER ENTRANCE SIGN - - 195,000 - - - - 195,000 21270 VENETIAN NEIGH.-ISLANDS 46,372,927 - - - - - - • 46,372,927 23180 BAYSHORE NEIGH.BID PACK D 16,219,308 - - - - - - 16,219,308 23380 PALM&HIBISCUS ISLAND ENHANCEMENT 48,923,318 1,293,847 - - - - - 50,217,165 27319 GO#31:OCEAN DRIVE CORRIDOR - - - 4,000,000 - - 16,000,000 20,000,000 27419 GO#32:PALM&HIBISCUS NEIGHBORHOOD 1,000,000 - - - - - - 1,000,000 28580 ESPANOLA WAY CONVERSION 2,645,466 - - - - - - 2,645,466 28610 RUE VENDOME PUBLIC PLAZA 2,236,000 - - - - - - 2,236,000 28940 BAYSHORE NEIGH.CENTRAL-SOUTH 21,777,204 - - - - - - 21,777,204 29130 SOUTH POINTE MISCELANEOUS IMPR. 868,425 - - - - - - 868,425 29300 LINCOLN RD LENOX-COLLINS W/SIDE STR 40,000,000 - 7,635,000 - - - - 47,635,000 29310 CONVENTION CENTER LINCOLN RD CONNEC 10,000,000 - - - - - - 10,000,000 I A� EAC IM • CITY MIAMI BEACH ! ATTACHMENT B YY FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY PROGRAM PROJECT PROGRAM Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 29530 COLLINS PARK ANCILLARY IMPROVEMENTS 4,000,000 - - - - - - 4,000,000 29730 NORMANDY ISLE NEIGH ROW PHASE II 367,285 - - - - - - 367,285 64170 BISCAYNE POINTE ISLAND ENTRYWAY 337,109 - - - - - - 337,109 69790 SUNSET 3&4 UTILITY PAYMENT 1,532,002 - - - - - - 1,532,002 287,503,125 1,293,847 7,830,000 4,000,000 - - 16,000,000 316,626,972 ENVIRONMENT SUSTAINABILITY 20197 CITY CENTER RESILIENCY ENHANCEMENTS 1.000000 - - - - - - 1,000,000 66420 DADE BOULEVARD PEDESTRIAN PATHWAY 225 oIS 225,000 1.000,000 225,000 - - - - - 1,225,000 POLICE CHIEF OFFICE 2f571) 504 5 is SECURITY POOR 1 UBUC S6'A-;LS 2-000,000 - - 2,350,000 - - - 4.350 000; PROPERTY MANAGEMENT 591,20 3-BOWL SIGNAGE!PAIN I INC/UGH INC - 150,000 - - - - - 150,000 PW ADMINISTRATION 1 20922 NORMANDY ISLES DRAINAGE IMPROVEMENT - - - 21,004,861 21,004,861 - - 42,009,722 24020 ORCHARD PARK 250,000 - 5,000,000 - • 8,688,421 - 13,938,421 24120 TOWN CENTER - - 52,000,000 - - - - 52,000,000 24619 GO#37:SIDEWALK IMPROVEMENTS 3,500,000 - - 3,000,000 - - 6,500,000 13,000,000 27360 RESTORATIVE TREEWELL-PH 4-SOUTH BCH 690,000 - - - - - - 690,000 27519 GO#34:ABOVE GROUND IMPROVEMENTS - - - 5,000,000 - - 38,000,000 43,000,000 27619 GO#35:FLAMINGO PARK NEIGHBORHOOD - - - - - - 20,000,000 20,000,000 27819 GO#38:STREET PAVEMENT 7,500,000 - - 7,500,000 - - 15,000,000 30,000,000 28050 EVERGLADES COURT ALLEYWAY PAVING 300,000 - - - - - - 300,000 28119 GO#41:LA GORGE NEIGHBORHOOD - - - 2,000,000 - - 12,000,000 14,000,000 28219 GO#44:NORTH SHORE NEIGHBORHOOD - - - - - 8,000,000 8,000,000 29810 ALLEYWAY RESTORATION PH III 412,500 220,000 220,000 - - - - 852,500 29860 FLAMINGO 10G-6 ST.ROW IMPROVEMENTS 7,001,399 (6,969,616) - - - - - 31,783 29880 LINCOLN RD MALL ADA PEDESTRIAN 87,500 - - - - - 87,500 61117 RESTORATIVE TREE WELL TREATMENT 292,000 - - - - - 292,000 20,033,399 (6,749,616) 57,220.000 38,504,861 21,004,861 8,688,421 99,500,000 238,201,926 PW ENGINEERING 20078 CITYWIDE STREET PAVEMENT - - - - - 15.000,000 15,000,000 20141 7300 DICKENS AVE USCAPE-IRRIGATION - - 37,000 - - - - 37,000 20177 OCEAN DR.EXTENDED SIDEWALK PROJECT 235,000 - - - - - - 235,000 20250 LAGORCE ISLAND-LIGHTING TREES MISC 66,376 - - - - - - 66,376 20422 FLAMINGO NEIGHBORHOOD - 300,000 300,000 55,854,121 81,854,121 - - 138,308,242 20522 NAUTILUS NEIGHBORHOOD - - 250,000 - 29,236,421 - - 29,486,421 20587 1ST STREET-ALTON RD TO WASHINGTON 2,800,000 24,070,741 - - - - - 26,870,741 20607 11TH STREET-FLAMINGO NEIGHBORHOOD 7,602,460 - - - - - - 7,602,460 CITY OF MIAMI BEACH AA I t\i'd I ATTACHMENT B BEAC H FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY PROGRAM PROJECT PROGRAM Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 22050 BAYSHORE NEIGH.BID PACK A 25,085,154 - - - - - - 25,085,154 23220 NORTH SHORE NEIGH.IMPROVEMENTS 7,489,268 - 40,627,421 19,500,000 - - - 67,616,689 23240 LA GORGE NEIGHBORHOOD IMPROVEMENTS 2,498,141 - 80,000,000 - - - - 82,498,141 23270 CITY CENTER COMMERCIAL DISTRICT BPB 25,809,526 - 6,955,154 47,507,421 7,280,000 - - 87,552,101 23300 FLAMINGO NEIGHBORHOOD-SOUTH 7,478,640 - - - - - - 7,478,640 23360 WEST AVE/BAY RD NEIGH. 25,902,873 - - - - - - 25,902,873 29320 17TH STREET NORTH IMPROVEMENTS 2,000,000 - - - - - - 2,000,000 60237 COLLINS)HARDING ALLEY RESTORATION 100,000 - - - - - - 100,000 107,067,438 24,370,741 128,169,575 , e. 122,861,542. 118,370,542 15.000,000 515,839,836 PW GREENSPACE MANAGEMEw ! sj•' '' 3 x 29760 RESTORATIVE TREEWELL-PH 3 683,911 - - - - - - 683,911 61619 NORTH BEACH ROW LANDSCAPING 170,000 100,000 100,000 100,000 100,000 100,000 - 670,000 62019 MIDDLE BEACH ROW LANDSCAPE 126,000 100,000 100,000 100,000 100,000 150,000 676,000 63521 RESTORATIVE TREE WELL CITYWIDE - - 240,000 240,000 240,000 240,000 - 960,000 64119 INDIAN CREEK LANDSCAPE&IRRIGATION 473,000 727,000 - - - - - 1,200,000 68219 GO#33:STREET TREE MASTER PLAN 2,500,000 - - 2,500,000 - - - 5,000,000 3,952,911 927,000 440,000 2,940,000 440,000 490,000 - 9,189,911 20000 PAVEMENT&SIDEWALK PROGRAM 2,195,000 - - - - - - 2,195,000 25650 CITYWIDE CURB RAMP INSTALLATION 112,560 - - - - - - 112,560 26700 ROW IMPROVEMENT PROJECT 1,844,084 - - - - - - 1,844,084 4,151,644 - ....-i4v4.151,644 TOURISM .1551,644TOURISM CULTURAL DEVELOPMENTf<\ �� , t''F, .r `„tc '"';, : -. : ,.:' <• . ` ?,,,,,0 21019 I ,,'.1 : ,..1ST ST RECOMMENUAI"IONS 100,000 - - - - - - 100,000 27719 GO#36:WASHINGTON AVE.CORRIDOR - - - 2,000,000 - - 8,000,000 10,000,000 28019 GO#40:41ST ST.CORRIDOR 1,500,000 - - 1,500,000 - - 12,000,000 15,000,000 28630 BONITA DRIVE STREET END IMPROVEMENT 135,000 - - - - - - 135,000 28640 NORTH BEACH STREETSCAPE PILOT PROJ 330,000 - - - - - - 330,000 2,065,000 3,500,000 - 20,000,000 : 25,565,000 TRANSPORTATION *-7:::„ ... ..:"',".:"7,,j,,?,*, .:-. . . .. .., mi\ ...._. e,:,.*ice,. W# ,,:: *,�„ .V41-.4 , 41ik sl--t ,, .•k? y,.A: w 21219 SR A1A/COLLINS AVE INTERSECTION IMP 559,000 - - - - - - 559,000 21319 ROYAL PALM AVE&46TH STREET CIRCLE 107,000 - - - - - 107,000 27870 72ND STREET PROTECTED BIKE LANE 519,000 - - - - 519,000 27910 MERIDIAN AVE(NORTH)28TH ST&DADE 278,000 - - - - - 278,000 1,463,000 - - - ap - - 1,463,000 TOTAL: 429,236,517 20,216,972 193,659,575 174,156,403 139,815,403 9,178,421 150,500,000 1,116,763,291 STREET LIGHTING CAPITAL IMPROVEMENT PROGRAM 27510 NORMANDY ISLE-MARSEILLE LIGHTING 139,000 - - - - 139.000 PW ADMINISTRATION - • AAI 1,1Yj,1�1 EAC CIMIAMI BEACH ATTACHMENT B FY 2020-2024 CAPITALAL IMPROVEMENT PLAN BY PROGRAM PROJECT PROGRAM Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 27070 BEACHWALK LIGHTING RETRO 665,625 - - - - - - 665,625 62940 CITYWIDE PARKING LOT LIGHTING 450,000 - - - - - - 450,000 64918 SMART LIGHTING MASTER PLAN 1,863,895 600,000 600,000 600,000 600,000 600,000 600,000 5,463,895 69019 GO#55:STREET LIGHTING IMPROVEMENTS 5,000,000 - - 5,000,000 - - - 10,000,000 7,979,520 600,000 600,000 5,600,000 600,000 600,000 600,000 16.579,520 PW ENGINEERING 21218 5TH STREET FLYOVER LIGHTING 148,779 - - 148,779 27650 ALUMINUM STREETLIGHTING POLE REPLACEMENT 168,060 - - 168,060 316.839 - - - - - - 316,839 PW STREETS 27800 STREET LIGHTING IMPROVEMENTS 1,625,305 - - 12,500,000 12,500,000 12,500,000 12,500,000 51,625,305 TOTAL: 10,060,664 600,000 600,000 18,100,000 13,100,000 13,100,000 13,100,000 68,660,664 TRANSIT I TRANSPORTATION CAPITAL IMPROVEMENT PROGRAM 20327 2 WAY CONVERSION 42ND ST.SHERIDAN 510,000 - - - - - - 510,000 25410 BEACHWALK II 4,233,433 - - - - 4,233,433 27940 EUCLID AVE.-FROM 17TH ST&5TH ST 470,000 470.000 5,213.433 - - - - - . 5,213.433 PROPERTY MANAGEMENT 20521 JULIA TURLE ENTRANCE SIGN . . 275.000 - - - - 275,000 TRANSPORTATION 20018 ADAPTIVE TRAFFIC SIGNAL CONI"ROLS - . - - - - 1,800 CO0 1,800,000 20118 BAYSHORE NEIGH.TRAFFIC CALMING 1A 378,075378,075 20200 TRANSPORTATION CAPITAL INITIATIVE 42,492,028 - - - - - - 42,492,028 20218 NAUTILUS TRAFFIC CALMING PHASE I 355,500 - - - - - - 355,500 20221 16TH STREET PROTECTED BIKE LANES - - 627,000 - - - - 627,000 20318 VENETIAN ILLUMINATED CROSSWALKS 180,000 - - - - - - 180,000 20617 NEW BUS SHELTER DESIGNS 504,251 - - - - 504,251 20618 MERIDIAN AVENUE BICYCLE LANES 250,000 - - - - - - 250,000 20620 LA GORCE/PINE TREE DR BIKE LANES - - 300,000 1,500,000 - - - 1,800,000 20718 SIGNALIZATION ALTON RD AND 4TH ST 580,000 - - - - - - 580,000 20818 ROYAL PALM NEIGHBORHOOD GREENWAY 430,000 - - - - - - 430,000 21014 PROJECTED BIKE LANES - 130,000 - 524,247 202,341 - - 856,588 21024 PROTECTED BICYCLE LANES - - - - 117,659 - 1,980,000 2,097,659 21419 MERIDIAN AVENUE PEDESTRIAN CROSSING 410,000 - - - - - - 410,000 21522 ALTON ROAD SHARED USE PATH PHASE II - - - - - - 3,631,000 3,631,000 22518 ENHANCED CROSSWALKS 480,000 - - - - - - 480,000 23020 ALTON RD&16TH STREET INTERSECTION - 540,000 - - - - - 540,000 27860 51ST BIKE LANE-ALTON RD TO PINETREE 50,000 - - - - - - 50,000 27880 73RD STREET PROTECTED BIKE LANES 239,000 - • - - - - 239,000 /� I A AA EAC CITY IMPROVEMENT MIAMI BEACH ATTACHMENT B H FY 2020-2024 CAPITAL PLAN BY PROGRAM PROJECT PROGRAM Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 27900 PRAIRIE AVE FROM 28TH ST TO 44TH PA 294,000 - - - - - - 294,000 28080 INTELLIGENT TRANSPORT SYSTEM 18,776,260 - - - - - - 18,776,260 60177 SOUTH BEACH PEDESTRIAN ZONES 300,000 650,000 - - - - - 950,000 60207 PAINTING VENETIAN BIKE LANES 486,558 - - - - - - 486,558 60217 OCEAN DR LGBT DECORATIVE INTERSECT 167,257 - - - - - 167,257 60222 NORTH BEACH GREENWAYS PHASE III - - - 1,170,220 - - - 1,170,220 60247 42ND ST.GREEN BICLYCLE LANES PAINT 150,000 - - - - - 150,000 60257 BAY DRIVE NEIGHBORHOOD GREENWAY 100,000 - - - - - - 100.000 60327 10TH&11TH STREET NEIGHBORHOOD - - 1,494,000 - - - - 1,494,000 60817 SAFE ROUTES-BISCAYNE ELEMENTARY 70,628 - - - - - - 70,628 62521 NORTH BEACH GREENWAYS-PHASE II - - 604,230 - - - - 604,230 64190 ENTRANCE SIGNS TO NORTH BEACH 300,000 449,000 - - - - - 749,000 65518 JEFFERSON AVE&15TH ST BEACONS - 74,200 - - - - - 74,200 68419 GO#42:TRAFFIC CALMING 1,500,000 - - 500,000 - - - 2,000,000 68619 GO#43:BIKE LANES&SHARED PATHS 2,500,000 - - 1,200,000 - - 1,300,000 5,000,000 69820 NORTH BEACH GREENWAYS PHASE I - 448,625 - - - - - 448,625 70,993,557 2,291,825 3,025,230 4,894,467 320,000 - 8,711,000 90,236,079 TOTAL: 76,206,9901 2,291,8251 3,300,2301 4,894,4671 320,0001 -1 8,711,0001 95,724,512 UTILITIES ENVIRONMENT SUSTAINABILITY 62619 ENERGY SUB-METERS IN MUN.BUILD^1GS ,8000 - - - - 68,000 NV ADMINISTRATION; o,,c-, .': 20124 ALLISON ISLAND NORTH - - 6,154,321 - 6,154,321 20224 NORMANDY SHORES - - - - 29,147,027 - 29,147,027 20323 LA GORGE ISLAND - - - - - 9,104,921 - 9,104,921 20324 BELLE ISLE - - - - - 4,550,621 - 4,550,621 20424 BISCAYNE BEACH - - - - - 20,445,421 - 20,445,421 20524 BISCAYNE POINT - - - - - 13,266,321 - 13,266,321 20624 CENTRAL BAYSHORE - - - - 7,963,400 - 7,963,400 20724 INDIAN CREEK PARKWAY - - - - - 9,217,121 - 9,217,121 20824 PARK VIEW ISLAND - - - - - 4,759,121 - 4,759,121 20924 STAR ISLAND - - - - 6,032,621 - 6,032,621 21122 SUNSET ISLAND 1 - - - - 5,319,421 - - 5,319,421 21222 SUNSET ISLAND 2 - - - - 7,446,121 - - 7,446,121 21322 ALTON ROAD UTILITIES - - - - 11,700,000 - - 11,700,000 22320 LAKEVIEW NEIGHBORHOOD IMPROVEMENTS - - 41,000,000 - - - - 41,000,000 22418 MT.SINAI STORMWATER PUMP STATION - - 19,727,421 - - - - 19,727,421 60319 WATER METER REPLACEMENT PROGRAM 2,000,000 - 5,000,000 - - - - 7,000,000 60419 DERM&EPA CONSENT DECREE 400,000 500,000 500,000 500,000 500,000 500,000 - 2,900,000 B E IM CITY MIAMI BEACH ATTACHMENT B AA FY 2020-2024 CAPITAL IMPROVEMENT PLAN BY PROGRAM PROJECT PROGRAM Previous Years FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total 2,400,000 500,000 66,227,421 500,000 24,965.542 111,140,895 - 205,733,858 PW ENGINEERING 20527 FDOT UTILITES RELOCATION 671,529 - - - - - - 677,529 20619 WASTE WATER STATIONS REHABILITATION - 4,500,000 5,850,000 5,850,000 5,850,000 5,850.000 - 27,900,000 20719 SCADA AND PLC SYSTEMS 2,750,000 3,250,500 1,237,500 - - - - 7,238,000 21020 ALTON RD.WATER MAIN IMPROVEMENTS - - 11,700,000 - - - - 11,700,000 21220 INDIAN CREEK STREET DRAINAGE IMP. 15,093,426 - - - - - - 15,093,426 21720 DRAINAGE SYSTEM WATER QUALITY PILOT - 500,000 - - - - - 500,000 23000 SUNSET HARBOUR PUMPSTATION UPGRADES 29,215,353 (1,190,983) - - - - - 28,024,370 27370 541N DIAMETER REDUNDANT SEWER FORCE 17,644,487 - - - - - - 17,644,487 28120 WATER PUMP STATIONS IMPROVEMENTS - 1,000,000 - - - - - 1,000,000 28220 WASTEWATER MANHOLE REHABILITATION - 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 - 7,500,000 28320 SEWER PUMP STATION ODOR CONTROL - 850,600 - - - - - 850,600 28420 SWR PUMP STATION#18 IMPROVEMENTS - 700,000 - - - - - 700,000 28520 WATER&WASTEWATER MAINS AND REHAB - 17,000,000 - - - - - 17,000,000 28920 BIOSWALE PILOT PROJECT - 850,000 - - - - - 850,000 29820 STORM WATER OUTFALLS - 2,000,000 - - - - - 2,000,000 68000 CLEAN WATER SYSTEM 7.500.000 - - - - - - 7,500,000 72,880,795 30,960,117 20,287,500 7,350,000 7,350,000 7,350,000 - 146,178,412 TRANSPORTATION 22018 FIBER COMMUNICATIONS INSTALLATION 161,000 - 131,000 - - - - 292,000 TOTAL: 75,509,7951 31,460,1171 86,645,9211 7,850,0001 32,315,5421 118,490,8951 -, 352,272,270 GRAND TOTAL: 1,578,510,671 88,171,516 326,160,729 291,499,970 206,397,445 154,631,316 232,540,000 2,877,911,647 Resolutions - R7 I MIAMI BEACH COMMISSION MEMORANDUM TO: Honorable Mayor and Members of the City Commission FROM: Jimmy L. Morales, City Manager DATE: September 11, 2019 5:03 p.m. First Reading Public Hearing SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ADOPTING THE TENTATIVE CAPITAL IMPROVEMENT PLAN FOR FISCAL YEARS (FY) 2020 - 2024 AND ADOPTING THE CITY OF MIAMI BEACH TENTATIVE CAPITAL BUDGET FOR FY 2020, SUBJECT TO A SECOND PUBLIC HEARING SCHEDULED ON WEDNESDAY, SEPTEMBER 25, 2019 AT 5:03 P.M. Legislative Tracking Office of Management and Budget ATTACHMENTS: Description ❑ FY 2020 First PH Merno- Capital Budget n Resolution and Attachments ❑ Ad Page 1344 of 2228 MAA BEAD City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov COMMISSION MEMORANDUM TO: Mayor Dan Gelber and Members of the City Commission FROM: Jimmy L. Morales, City Manager DATE: September 11, 2019 SUBJECT:A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ADOPTING THE TENTATIVE CAPITAL IMPROVEMENT PLAN FOR FISCAL YEARS 2020 - 2024 AND ADOPTING THE CITY OF MIAMI BEACH TENTATIVE CAPITAL BUDGET FOR FY 2020 SUBJECT TO A SECOND PUBLIC HEARING SCHEDULED ON WEDNESDAY, SEPTEMBER 25, 2019 AT 5:03 P.M. ADMINISTRATION RECOMMENDATION Adopt the Resolution adopting the Tentative Capital Improvement Plan (CIP) for FY 2020 —2024 and adopting the Tentative Capital Budget for FY 2020. BACKGROUND The City's annual Capital Budget contains capital project commitments appropriated for Fiscal Year 2020. Preparation of the Capital Budget occurred simultaneously with the development of the FY 2020 — FY 2024 Capital Improvement Plan and FY 2020 Operating Budget. The Capital Budget represents the project budgets for both current and new capital projects necessary to improve, enhance, and maintain public facilities and infrastructure to meet the service demands of residents and visitors to the City of Miami Beach. Capital reserves, debt service payments, and capital purchases found in the Operating Budget are not included in this budget. The Capital Budget for FY 2020 appropriates funding for projects that will require commitment of funds during the upcoming fiscal year. The Capital Improvement Plan (CIP) is a financing and construction/acquisition plan for projects that require significant capital investment. The CIP, which is updated annually and submitted to the City Commission for adoption, specifies and describes the City's capital project schedules and priorities for the five years immediately following the Commission's adoption. In addition, the first year of the plan outlines the funding to be appropriated in the annual Capital Budget. This document is an official statement of public policy regarding long-range physical development in the City of Miami Beach. The FY 2020 — 2024 CIP of the City of Miami Beach is a five-year plan of public improvements and capital expenditures proposed by the City. A capital improvement is defined as a capital or "in-kind" expenditure of $25,000 or more, resulting in the acquisition, improvement, or addition to fixed assets in the form of land, buildings, or improvements more-or-less permanent in character and durable equipment with a life expectancy of at least five years. The FY 2020 —2024 CIP for the City of Miami Beach is a five-year plan of public improvements and capital expenditures proposed by the City totaling $1.1 billion, of which $88.2 million is Page 1345 of 2228 FY 2020 Tentative Capital Budget and FY 2020- 2024 C!P September 11, 2019 Page 2 of 29 programmed to be appropriated in FY 2020. The total for projects included in the CIP, comprising $1.6 billion in appropriations for ongoing projects through FY 2019 and $232.5 million in unfunded/programmed needs beyond FY 2024, is $2.9 billion. Projects will address many needs across different areas of the City including: neighborhood enhancements such as landscaping and sidewalk restoration; traffic calming; roadway and bridge resurfacing and reconstruction; water, sewer, and drainage system improvements; park construction, renovations and upgrades; renovation of seawalls; parking lot and garage renovations; and construction/renovations of public facilities. A detailed listing of all capital projects is provided in the Proposed FY 2020—2024 Capital Improvement Plan& FY 2020 Capital Budget document. The Capital Budget for FY 2020 will be appropriated on October 1, 2019. On July 21, 1999, the City Commission approved the CIP for the City and the Redevelopment Agency (RDA). Since that time, the City has issued additional General Obligation Bonds pursuant to referendum; Water and Sewer Revenue Bonds; Storm Water Revenue Bonds; Resort Tax Revenue, Parking Revenue, RDA Tax Increment Revenue and Revenue Refunding Bonds; and an Equipment Loan. In addition, beginning in FY 2006, the City committed to funding a Pay-As- You-Go component of the Capital Budget funded from General Fund revenues, as well as committing to using Resort Tax Quality of Life funds in North, Middle, and South Beach for capital projects. In 2005, through a series of workshops with the Mayor and Commission for the City of Miami Beach, previously approved appropriations were reviewed to ensure that projects scheduled to begin construction in the next few years were fully funded, appropriating funds from other projects scheduled to begin in later years and providing for those to be replaced from future financing sources. These changes were reflected in the 2006 —2010 Capital Budget and CIP for the City and the RDA which was approved by the City Commission on September 21, 2005. In the spring of 2006, the City created a Capital Budget Process Committee with the responsibility of reviewing and prioritizing new capital projects that would be funded in a given fiscal year and for recommendation of funding allocations from authorized sources for the prioritized projects. The Committee developed and implemented a structured committee-based process for the development of the CIP and Budget, including review criteria that projects must meet to be considered for funding. This process is reviewed and refined annually by the Committee. Based on the direction received from the Finance and Citywide Projects Committee (FCWPC) in February 2008, the process was modified to allow for early input to the prioritization process by the City Commission. Under the new process, a preliminary list of unfunded projects is presented to the City Commission or the Finance and Citywide Projects Committee, providing the opportunity for input and prioritization. This is consistent with the process for Commission input regarding operating budget priorities and the format used would be similar to that used to seek guidance on operating budget priorities in prior years. This revised process allows for early input by the City Commission regarding priorities for funding, subject to availability. Page 1346 of 2228 FY 2020 Tentative Capital Budget and FY 2020— 2024 CIP September 11, 2019 Page 3 of 29 The flowchart below provides an overview of the Capital Budget process and timelines. February Departments submit updates to existing protects,identify protects to be closed, ry and submit new project forms March to May Capital prionh:at on and development of draft Capital Budget June Commission review of draft Capitol Budget July/August City Manager develops Proposed Budget Septemberads ar ,,,. Construction management for the CIP is provided by the Office of Capital Improvement Projects (CIP Office). This office is designed to consolidate the City's capital construction efforts into a single entity tasked with constructing the City's funded Capital Improvements in a timely manner. Projects within neighborhoods are combined to create a single project that addresses the neighborhoods' needs for infrastructure upgrades, traffic flow, enhancements, etc. This comprehensive approach minimizes disruptions and generates costs savings. To continue this on-going implementation effort, the City has entered into agreements with various firms for program management, architectural, engineering, and other relevant professional services, as well as awarding contracts for construction. In addition, several other departments provide management of some specialized projects. For example, Public Works provides construction management for some utility projects; Environment & Sustainability provides management for some environmental projects and Parks and Recreation provides management of some park-related projects. On November 6, 2018, the City of Miami Beach's voters approved the issuance of a $439 million G.O. Bond to fund a total of 57 capital projects citywide, ranging from vertical construction, roadwork, park constructions and renovations, technology implementation, renewals and repairs, and underground infrastructure work. In order to ensure that these projects are completed within a reasonable timeframe, within budget, on a coordinated basis (including coordination with non- G.O. Bond projects and projects by other jurisdictions), through the incorporation of resiliency and best practices, and with effective communication to all impacted stakeholders, the G.O. Bond Program Management division of the City Manager's Office is spearheading the implementation of these projects. Page 1347 of 2228 FY 2020 Tentative Capital Budget and FY 2020– 2024 C!P September 11, 2019 Page 4 of 29 BUILDING RESILIENCY INTO CAPITAL PROJECTS How important is resilience in capital planning? Quite important, according to the ratings agencies. This year, the city was asked: • "How...[is] the City incorporating significant adaption-related projects into its financial and capital planning?" S&P Rating Agency 2019, and • "Please discuss capital planning and how sea level rise and other climate risks are incorporated into capital planning," Moody's Rating Agency 2019. The city needs to design with resilience in mind now with the same urgency of Hurricane Irma recovery—the urgency of bouncing back as quickly as possible, allowing residents to return and recover, opening the beaches, reaching normal. A resilient investment reduces damage and speeds recovery. Today we don't have the luxury of designing for one purpose, such as a park, as we did thirty years ago. Our investments need to serve many purposes whenever possible. A park is not just for recreation, it needs to help with sea level rise adaptation, storm water retention, water quality, shade, increase biodiversity, and carbon sequestration. Infrastructure investment though the capital budget helps build resilience in the most cost effective and efficient way possible. The purpose of designing with resilience in mind is to make sure we can bounce back as quickly as possible after a shock, like a storm, and to improve a community stress, like pedestrian safety. Designing in this way, at the very beginning when the project is being scoped, means we can get the best results for the lowest cost. Studies show that for every$1 invested in risk reduction, cities can see $6 in benefits. We can also create additional cost-free benefits, referred to as "co- benefits". If we miss these opportunities at the very beginning of scope development, the opportunities are lost. Trying to add resilience later means more time in terms of change orders, and more cost in terms of redesign. Often what the community wants most out of capital projects—that some may consider as design aesthetics—are high priorities for residents. For example, designing the space for tree canopy from the beginning means the tree has a chance for proper placement to maximize shade and to live longer. Trees also help with carbon sequestration and reduce the heat island effect. Including bike lanes and improving sidewalks, along with other underground infrastructure improvements, makes our city easier to move around and reduces car dependence that causes traffic and greenhouse gas emissions. Reducing car dependence is also a City Commission approved goal—and congestion is a stress that affects all residents. Other enhancements—like unique signage, art, and solar lighting—supports Miami's Beach's iconic image for residents and visitors and was recommended by Urban Land Institute to as part of our storm water program review. To achieve resilience and its co-benefits, cities need leadership and training. The capital budget is created through an existing citywide process and a prime opportunity increase resilience through infrastructure investment. Over the last few years, the city has made great strides increasing resilience through infrastructure improvements and land use amendments. The Urban Land Institute Advisory Services Panel recommended that the city design projects in a way that increases quality of life benefits and incorporates more blue and green infrastructure, The capital budget is the best place to achieve this. The capital budget has three distinct phases: Page 1348 of 2228 FY 2020 Tentative Capital Budget and FY 2020– 2024 CIP September 11, 2019 Page 5 of 29 • Projects that have been approved in prior years and programmed for funding in future years • Projects that have been programmed in prior years to be considered for funding in the coming year • Applications for new projects that are not yet funded This budget development year, the process was enhanced through the following: • Resilience training workshops were held for project managers • Capital application forms for new projects were adjusted for departments to specifically identify resilience improvements and their multiple benefits Staff has been trained and encouraged to be innovative and to maximize resilience improvements and efficiencies. This is an important first step and we will expand and improve this effort in future budget cycles. This is the tie to economic resilience and addressing our climate change and sea level rise risks. PURPOSE AND BENEFIT The CIP is a proposed funding schedule for five years, which is updated annually to add new projects, re-evaluate program and project priorities, and revise recommendations while also considering new requirements and new sources of funding. The annual capital programming process provides the following benefits: • Serves as a source of information about the City's physical development and capital expenditures to the citizens, City Commission and administration, private investors, funding agencies, and financial institutions • Provides a mechanism that applies uniformity and consistency in the evaluation of projects and assists in the establishment of priorities • Provides for coordination among projects with respect to funding, location, and time The CIP is developed in accordance with the City's stated plans, goals, and objectives and provides for the proper physical and financial coordination of projects. Private sector development initiatives that provide/require modifications to certain infrastructure are properly coordinated with City projects to achieve compatibility and the greatest benefit. LEGAL AUTHORITY Legal requirements for preparing the City of Miami Beach's CIP are set forth in Miami-Dade County Code (Section 2-11.7-2-11.11), and the Florida Statutes, respectively. House Bill 2377, passed during the 2000 Regular Session of the Florida Legislature, requires the thorough revision of the CIP as a basis of policy and budget initiatives. RELATIONSHIP OF THE CIP TO THE COMPREHENSIVE PLAN The City of Miami Beach's Comprehensive Plan contains a Capital Improvement Element (CIE) which describes major City public facility improvements recommended in various elements of the Comprehensive Plan for implementation during the five years following adoption of the Comprehensive Plan. The CIE also demonstrates the ability to fund those improvements. The projects listed are intended to address existing "deficiencies," achieve facility "replacement," or contribute to the general "improvement of Miami Beach." The information in the CIE of the City's Page 1349 of 2228 FY 2020 Tentative Capital Budget and FY 2020— 2024 C/P September 11, 2019 Page 6 of 29 Comprehensive Plan is based on the CIP. PROCESS AND PREPARATION OF THE CIP AND CAPITAL BUDGET The City's CIP and Capital Budget development process begins in the spring when all departments are asked to prepare their own CIP containing information on the department's ongoing and proposed capital projects. Individual departments submit requests to the Budget Office, identifying funding sources and requesting commitment of funds for their respective projects. The Capital Budget Process Committee, comprised of the Office of Capital Improvements Projects, Public Works Department, Parks and Recreation Department, Finance Department, Transportation Department, Environment and Sustainability Department, and the Office of Management and Budget Improvement, reviews the proposed projects according to the City's strategic priorities, based on the Review Criteria described below. In addition, the review considers conformance with the City's Comprehensive Plan and other plans for specific areas, and linkages with other projects for combined impact, the availability and source of funding, project impact for maximum benefits to the citizens of the City, and the length of time that a project will benefit the City. The proposed document is then reviewed by the City Manager, and upon approval, is submitted to the Finance and Citywide Projects Committee for review and, subsequently, to the City Commission and Redevelopment Agency Board for final approval and adoption. REVIEW CRITERIA All projects submitted for inclusion in the City's CIP are reviewed on the basis of relative need, benefit, and cost. In addition, several guiding policies direct the determination of the content, scheduling, and funding of the CIP. These policies are as follows: 1. Meet the City's strategic priorities 2. Maximize return on investment in consideration of financial limitations and budget constraints so as to: - Preserve prior investments where possible - Reduce operating costs - Maximize use of outside funding sources to leverage the City's investment - Maximize cost effective service delivery 3. Improve and enhance the existing network of City service levels and facilities 4. Implement adopted plans 5. Demonstrate coordination and compatibility with other capital projects and other public and private efforts CAPITAL BUDGET PROCESS REVIEW There are three major steps of the Capital Budget review process that staff undertakes each year: 1. Existing projects are reviewed to identify areas where funding previously programmed in the CIP for the upcoming year, as well as future years of the plan, need to be revised due to changes in cost, scope, etc. 2. Projects that have been in the conceptual planning stage are reviewed to determine whether they are sufficiently far enough along to warrant incorporating them in the adopted Page 1350 of 2228 FY 2020 Tentative Capital Budget and FY 2020- 2024 C/P September 11, 2019 Page 7 of 29 capital budget and CIP for the upcoming year. 3. Funding for new projects are submitted and reviewed by an in-house Capital Budget Process Committee comprised of City Staff. Capital funding priorities were discussed at the Finance and Citywide Projects Committee Budget Briefings held on June 14, 2019 and July 19, 2019. The City Manager, Assistant City Managers, the CIP Office Director, other Department Directors, and other City staff were available to discuss specific projects and respond to the Committee's questions. SOURCES OF FUNDS The success of any CIP depends on the close coordination of the physical plan with a financial plan. Projects may be financed through a "Pay-As-You Go"capital component based on transfers from the General Fund, although these are often challenging to fund as they must compete with recurring operating requirements. For this reason, the City has a financial goal of funding at least 5 percent of the General Fund operating budget as transfers for capital projects (Pay-As-You-Go, Renewal and Replacement, Information and Communication Technology) and capital projects contingency. The purpose of this goal is multi-faceted: 1. To provide flexibility in the operating budget that would allow the budget to be reduced without impacting services during difficult economic times 2. To ensure that the City funds needed upkeep on our General Fund facilities, and right-of- way landscaping, lighting, etc. 3. To provide a mechanism to address additional scope of small new projects prioritized by the community and the City Commission instead of having to delay these for a larger General Obligation Bond issue 4. To provide contingency funding so that projects where bids were higher than budgeted did not have to be delayed, especially during a heated construction market where delays often lead to further increases in costs The FY 2020 Operating Budget and Work Plan provides for continual improvements and maintenance of our facilities and neighborhoods infrastructure by appropriating, from the General Fund, $2.9 million as Pay-As-You-Go (PAYGO) funds to be used for PAYGO eligible projects, $769,000 for Capital Renewal & Replacement projects, and $300,000 for Information and Communication Technology projects. At the July 25, 2018 City Commission meeting, the City Commission voted to approve a dedicated PAYGO millage rate of .0755 via Resolution 2018-30429. This allows for growth over time with property values Additional means of financing of capital projects include the following: • Borrowing money through the sale of bonds authorized by voters - General Obligation Bonds. General Obligation Debt(G.O. Debt) is the debt service funding required for voter- approved bonds issued with the belief that a municipality will be able to repay its debt obligation through taxation or revenue from projects. No assets are used as collateral. Funds in this category include: o Gulf Breeze Bond Funds - Other (Loan Pool) o RCP - 15M Bond - 1996 Parks, Recreation and Culture GO Bond Page 1351 of 2228 FY 2020 Tentative Capital Budget and FY 2020— 2024 CIP September 11, 2019 Page 8 of 29 o 1999 GO Bonds— Fire Safety o 1999 GO Bonds — Neighborhood Improvements o 1999 GO Bonds — Parks & Beaches o 2003 GO Bonds — Fire Safety o 2003 GO Bonds — Neighborhood Improvements o 2003 GO Bonds — Parks & Beaches o 2019 GO Bonds— Infrastructure o 2019 GO Bonds— Parks o 2019 GO Bonds— Public Safety • Borrowing money through the sale of bonds paid for by pledging a specific revenue stream — Revenue Bonds. Funds in this category include: o 1997 Parking System Revenue Bonds o 2010 Parking Bonds o 2015 Parking Revenue Bonds o 2015 RDA Bonds o 2015 Resort Tax 1% Bonds o Storm Water Bonds 2000 o Storm Water Bonds 2011 o Storm Water Bonds 2015 o Storm Water Bonds 2017 o Interest on Storm Water Bonds o Proposed Future Storm Water Bonds o Water and Sewer Bonds 2000 o Water and Sewer Gulf Breeze Loan 2006 Series o Water and Sewer Gulf Breeze Loan 2010 Series o Water and Sewer Bonds 2017 o Interest on Water & Sewer Bonds o Proposed Future Water & Sewer Bonds • Loans for Energy Savings Projects whereby the financing is secured by the costs savings that will be generated by the project • Equipment Loans/Leases — used to fund capital equipment such as cars, trucks, and heavy equipment • Federal, State, and County Grant Aid Programs. Funding sources in this category include the following: o HUD (Housing and Urban Development) Section 108 Loan o Miami-Dade County Bond (County GO) o Federal Emergency Management Agency (FEMA) • Special Revenue Funds, which by law, may only be used for specific purposes. Funding sources in this category include the following: o The Resort Tax Fund is supported primarily by taxes levied on hotel, motel, rooming house and short term apartment room rents as well as on food and beverages sold at retail in any restaurant, as authorized by State Statute, and is used to fund tourism- eligible expenditures. A specific component of this Fund (the 1% Quality of Life Fund) is used to support tourism-eligible capital projects in north, south and mid-beach that improve the quality of life of the community. The City Commission approved the revision of the allocations during the FY 2019 budget process with an increase in the distribution to Transportation, to help support the cost of the trolley program. Transportation now receives 60%of Quality of Life funds with the remaining 40%being distributed evenly among North Beach, Mid Beach, South Beach, and the Arts. Page 1352 of 2228 FY 2020 Tentative Capital Budget and FY 2020— 2024 C/P September 11, 2019 Page 9 of 29 c Convention Center 1°/0 Resort Tax — used to establish and maintain a capital renewal and replacement fund for improving and maintaining the Convention Center, after providing for payment of annual debt service and related obligations o Parking Impact Fees o Concurrency Mitigation Fund o Half-Cent Transit Surtax o Local Option Gas Tax o Convention Development Tax o Information and Communications Technology Funds o 911 Emergency Funds o Art in Public Places Fund o Building Technology Fund • Enterprise Fund Revenues which are derived from operations that are financed and operated in a manner like private businesses. The criteria used to determine if an operation should be an Enterprise Fund includes: 1) that it generates revenues; 2) that it provides services to the community; and 3)that it operates as a stand-alone entity,without subsides from taxes etc. The City's Enterprise Fund Departments are: Convention Center, Sanitation, Storm Water, Water, Sewer, and Parking. In some cases, operating funds are advanced of bond sales and are repaid when the bonds are sold. Capital funding sources in this category include the following: o Water & Sewer Enterprise Fund o Sanitation Enterprise Fund o Parking Operations Fund o Storm Water Enterprise Fund o Convention Center Fund • Internal Service Funds which are completely offset by revenues received from the General Fund, Enterprise Fund, and Special Revenue Fund Departments. The City's Internal Service Fund Departments are Information Technology, Central Services, Risk Management, Property Management, and Fleet Management. • Other miscellaneous funding sources include: • Capital Projects not Financed by Bonds/Reallocation of Bonds — Other Capital Projects/Capital Replacement Fund — reflecting funding from smaller miscellaneous sources In addition, the City of Miami Beach Redevelopment Agency is a separate entity whose Chairperson and Board of Directors are also the City's Mayor and City Commission. Capital projects funded by the Redevelopment Agency promote economic development within the City Center Redevelopment District. Further, revenues associated with the expiration of the South Pointe Redevelopment District (previously part of the Miami Beach Redevelopment Agency) are now used to fund storm water projects. The South Pointe Redevelopment District was the most successful redevelopment district in the State of Florida. Assessed values increased from $59 million when the district was established in 1976 to almost $2.2 billion as of January 1, 2005. The January 1, 2019 assessed value was $6.2 billion. The CIP reflects funding for projects prior to the expiration of the South Pointe Redevelopment District that have not yet been completed within the following funds: Page 1353 of 2228 FY 2020 Tentative Capital Budget and FY 2020- 2024 CIP September 11, 2019 Page 10 of 29 • South Pointe RDA • City Center RDA Capital Fund • MDC CDT Interlocal - Convention Development Tax or Resort Tax Eligible Projects • South Pointe Capital • RDA- Garage Fund OVERVIEW OF THE FY 2020 - FY 2024 FIVE YEAR CAPITAL IMPROVEMENT PLAN The FY 2020-FY 2024 CIP for the City of Miami Beach is a five-year plan of public improvements and capital expenditures proposed by the City. This document is an official statement of public policy regarding long-range physical development in the City of Miami Beach. The CIP has been updated to include projects that will be active during FY 2020 through FY 2024. The CIP has also been updated to include additional funding sources that have become available, changes in project timing, and other adjustments to ongoing projects as they have become better defined, including projects that have been reconfigured, re-titled, combined with or separated from other projects and/or project groupings. These adjustments have no fiscal or cash impact and are as a result of a comprehensive review of the program to ensure that our plan accurately reflects all project budgets, funding sources, and commitments. The CIP also contains information on appropriations prior to FY 2020 for ongoing/active projects, as well as potential future appropriations beyond FY 2024. In conjunction with the development of the FY 2020 Capital Budget and FY 2020 - FY 2024 CIP, the City began to develop a list of potential projects that may be funded in the future, including projects that have been approved as part of a plan, but not yet sequenced or approved for funding. The following table shows a summary of the Five-Year CIP by program area, as well as prior year funding for ongoing projects and funding requirements for desired projects with no anticipated funding for the FY 2020 Capital Budget and the FY 2020 - FY 2024 CIP, and beyond. PROGRAM PRIOR YEARS FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future TOTAL ART IN PUBLIC PLACES 8,288,131 - - - - - - 8,288.131 BRIDGES 9,245,127 1.131 077 3.743.923 - - - 595.000 14,715,127 CONVENTION CENTER 629.955.548 212.000 - - - - 630,167,548 ENVIRONMENTAL 4.604.000 250,000 1,450,000 1.500,000 - - 4,500,000 12,304,000 EQUIPMENT 34.209.908 7.038.718 '1.296,000 9,313.000 5,420,000 5.777 000 - 73.054,626 GENERAL PUBLIC BUILDINGS 24.613 977 875,037 6,600,000 5,000,000 - - '5.000,000 52.089.014 GOLF COURSES 5.649.190 545,000 305.000 - 5,000.000 - - 11,499,190 MONUMENTS 601.000 - 412.000 - - - - 1,013,000 PARKING 250,000 - - - - - - 250.000 PARKING GARAGES 62.466,660 12,683.000 3,710,000 1,430,000 1.662,000 1,785,000 12,525,000 96,261,660 PARKING LOTS 4,629,650 250,000 650.000 150.000 150,000 150,000 - 5.979,650 PARKS 149,794,486 2.675,770 4.905,080 57.764.100 2,163,500 1,050,000 21 275,000 239,627,936 RENEWAL&REPLACEMENT 24,878,657 2 942,000 5,153,000 4.342 000 1.451.000 100,000 6,334,000 45.200,657 SEAWALLS 28.310.371 5000,000 5,000 000 7.000000 5000.000 5,000,000 - 55,310,371 STREETS ISIDEWALKS/STREETSCAP 429.236.517 20,216,972 193,659.575 174,156.403 139 815.403 9,178,42' 150,500,000 1.116,763,291 STREET LIGHTING 10.060.664 600.000 600,000 18,100,000 13,100.000 13.100.000 13,100.000 68,660.664 TRANSIT I TRANSPORTATION 76,206,990 2,291,825 3,300.230 4,894.467 320.000 - 8.711,000 95,724.512 UTILITIES 75,509,795 31,460.117 56,645.921 7.850.000 32.315 542 118,490895 - 352,272,270 GRANO TOTAL 1,678,610,671 88,171,516 327,430,728 291,499,970 206,397,446 154,631,316 232,540,000 2,579,181,647 FY 2020-2024 1,065,130,076 The graph which follows shows the major project types with funding proposed and programmed in the FY 2020- FY 2024 CIP. The largest proposed and programmed investments are in the street/sidewalks/streetscapes (50%), and utilities (26%). Page 1354 of 2228 FY 2020 Tentative Capital Budget and FY 2020— 2024 C!P September 11, 2019 Page 11 of 29 FY 2020 - FY 2024 CAPITAL IMPROVEMENT PLAN: $1.07 BILLION •STREETS/SIDEWALKS/STREETSCAPES -UTILITIES PARKS STREET LIGHTING fQUIPMENT •SEAWALLS >O. •PARKING CARACAS �.. itfNf WAt b REPLACEMENT -GENERAL PUBLIC BUILDINGS •TRANSIT/TRANSPORTATION ,•-^-•••- .GOLF COURSES •BRIDGES _- •ENVIRONMENTAL PARKING LOTS yry' •. MONUMENTS 3 •PARKING OVERVIEW OF THE FY 2020 CAPITAL BUDGET (ONE-YEAR CAPITAL BUDGET) At the first budget briefing on June 14, 2019, staff presented the preliminary list of unfunded projects, which were being requested, including projects that the Administration proposed for funding subject to the availability of funds. A summary of projects recommended for funding in the FY 2020 Capital Budget, based on direction given by the Finance and Citywide Projects Committee on June 14, 2019 and July 19, 2019, is presented below (sorted by funding source): Transportation • North Beach Neighborhood Greenways-Phasel - $448,625 Capital Renewal and Replacement Fund (CRR) For FY 2020, it is proposed that the voted renewal and replacement millage rate remain flat at 0.0235, which would generate $769,000 for capital renewal and replacement projects. These funds, in addition to the prior year fund balance available for appropriation, would allow for the funding the following projects: • Historic City Hall Elevator Modernization - $350,000 • Unidad Building-Roof Replacement - $80,000 • PAL Building-Roof Repairs - $90,000 • City Hall-Cooling Tower Condenser Line Replacement - $90,000 • City Hall-Cooling Tower Base Replacement - $100,000 • Fire Station #2 (Admin)-Waterproofing & Wind Retrofit - $192,000 Page 1355 of 2228 FY 2020 Tentative Capital Budget and FY 2020— 2024 CIP September 11, 2019 Page 12 of 29 Community Development Block Grant (CDBG) • Added $396,037 in funding for the Biscayne Beach House (Affordable Housing property at 795 815' Street) based on approval of the FY 2020 CDBG Entitlement Fund allocations approved by Commission through Resolution 2019-30812 7th Street Garage • 72nd Street Recreation Center(GOB Project) - $128,296 • 7th Street Garage-Roofing Repairs & Renewal (CRR Project) - $84,000 • 7th Street Garage-New Interior Drainage Pipes (CRR Project) - $30,000 • 7th Street Garage-Interior Surface Restoration (CRR Project) - $95,000 Home Investment Partnership Program (HOME) • Biscayne Beach House Affordable Housing Property- $271,000 RDA City Center Renewal & Replacement Fund • Lincoln Rd Stone Restoration (CRR Project) - $214,619 Non-TIF (Tax Increment Financing) RDA Fund • Lincoln Rd Stone Restoration (CRR Project) - $153,381 Local Option Gas Tax (LOGT) Fund • Alton Road and 16th Street Intersection Improvements - $540,000 People's Transportation Plan (PTP/Half Cent Transit Surtax-County) Fund • Protected Bicycle Lanes (GOB project) - $130,000 • Jefferson Avenue and 15th Street Pedestrian Flashing Beacons - $74,200 Capital Proiects Financed by Other Funds • North Beach Oceanside Park Redevelopment- $1,250,000 • Sunset Islands 1&2 Guardhouse - $20,000 Pay-As-You-Go (PAYGO) Fund • Alleyway Restoration Ph III - $100,000 • Middle Beach Row Landscape - $50,000 • Indian Creek Landscape & Irrigation - $363,500 • Smart Building Automation System - $100,000 • Waterway Restoration (GOB project)- $250,000 • City Hall-Generator Replacement (CRR Project) - $600,000 • Historic City Hall- Variable Frequency Drives Replacement (CRR Project) - $200,000 • Polo Park Sports Lighting & Multi-Use Soccer Field - $857,680 • Citywide Bridges - $706,077 South Beach Quality of Life (SB QOL) Fund • Smart Lighting Master Plan - $200,000 • Dade Boulevard Pedestrian Pathway - $225,000 • South Beach Row Landscape - $280,000 • Beach Restrooms-Replace Restroom Exhaust Systems (CRR Project) - $19,000 • Super Bowl Signage/Painting/Decorative Lighting — South Beach - $150,000 • Super Bowl Landscape & Park Improvements - Lummus Park - $250,000 Page 1356 of 2228 FY 2020 Tentative Capital Budget and FY 2020— 2024 ClP September 11, 2019 Page 13 of 29 • Beachwalk Tree Wells (14th to 22nd Street) - $150,000 • Miami City Ballet Studio Flooring - $140,000 Mid Beach Quality of Life (MB QOL) Fund • Alleyway Restoration Ph III - $60,000 • Middle Beach Row Landscape - $50,000 • Indian Creek Landscape & Irrigation - $363,500 • Smart Lighting Master Plan - $200,000 • Miami Beach Golf Course-Roof Replacement (CRR Project) - $245,000 • Beach Restrooms-Replace Restroom Exhaust Systems (CRR Project) - $9,000 • MB Golf Course Storage Tank Replacement (CRR Project) - $200,000 • MB Golf Course Irrigation Pump House Renovation (CRR Project) - $100,000 • Indian Beach Park Playground Expansion - $168,090 • Security Cameras on Beachwalk (23rd to 46th Street) - $903,000 North Beach Quality of Life (NB QOL) Fund • Alleyway Restoration Ph III - $60,000 • North Beach Row Landscaping - $100,000 • Painting & Lighting of Bridges (North Beach Bridges) - $425,000 • Entrance Signs to North Beach - $449,000 • Smart Lighting Master Plan - $200,000 • Bandshell Rear Seating - $188,000 • Beach Restrooms-Replace Restroom Exhaust Systems (CRR Project) - $7,000 South Pointe RDA (Pre-Miami Dade County Interlocal Agreement Fund/MDC-ILA) • 1st Street-Alton Road to Washington - $2,469,616 • Defunding Flamingo 10G-6 Street ROW Improvements, which is now a part of the Flamingo Park Neighborhood project - $2,469,616 • South Beach Pedestrian Zones - $650,000 Miami-Dade County Interlocal —Convention Development Tax or Resort Tax Eligible Fund • Beach Storage Area Enclosure (CRR project) - $170,000 South Pointe Capital Fund • 1st Street-Alton Road to Washington - $4,500,000 • Defunding Flamingo 10G-6 Street ROW Improvements, which is now a part of the Flamingo Park Neighborhood project - $4,500,000 • South Pointe Park-Fire Alarm Renewal (CRR project) - $35,000 Water & Sewer Capital Projects Funded by Operations Fund • DERM & EPA Consent Decree (sanitary sewer evaluation survey) - $500,000 • Water Pump Stations Improvements - $1,000,000 • Wastewater Manhole Rehabilitation - $1,500,000 • Sewer Pump Station Odor Control Systems -$850,600 • Sewer Pump Station #18 Improvements - $700,000 • Public Works Facility-Water Station Roof Replacement (CRR Project) - $30,000 Page 1357 of 2228 FY 2020 Tentative Capital Budget and FY 2020— 2024 CIP September 11, 2019 Page 14 of 29 Water & Sewer Bonds • Waste Water Stations Rehabilitation - $4,500,000 • Scada and PLC Systems - $1,625,250 • Defunding Sunset Harbour Pump Station Upgrades project, as no additional funding is needed - $1,190,983 • Water & Wastewater Mains and Rehab - $17,000,000 Storm Water Bonds • 1st Street-Alton Road to Washington - $17,101,125 • Scada and PLC Systems - $1,625,250 • Bioswale Pilot Project (59th Street West of Alton) - $850,000 Miami-Dade County Inter-Local Agreement (Storm Water/General Capital Projects) Fund • Flamingo Neighborhood - $300,000 • Palm & Hibiscus Island Enhancement- $1,293,847 • Citywide Seawall Rehab - $5,000,000 Storm Water Capital Not Bonds • Storm Water Outfalls - $2,000,000 • Drainage System Water Quality Pilot- $500,000 Sanitation Enterprise Fund • 17th Street Garage-Reconfiguration of Sanitation Area (CRR Project) - $200,000 Convention Center Operating Fund • Convention Center Park (Fitness Area) - $212,000 RDA Garage Fund • Anchor Garage-Fire Alarm Replacement (CRR Project) - $120,000 • Anchor Garage-Replacement of Stairwell Doors (CRR Project) - $27,000 • Anchor Garage-Renewal of Interior Floor Drainage Piping (CRR Project) - $30,000 Penn Garage Fund • Penn Garage-Sealing of Superstructure (CRR Project) - $25,000 • Penn Garage-Interior Surface Restoration (CRR Project)- $95,000 Parking Bond • Garage-License Plate Recognition Cameras- $463,205 Parking Capital Not Bonds • 72nd Street Recreation Center (GOB Project) - $10,471,704 • Garage-License Plate Recognition Cameras - $391,795 • 42nd Street Garage-Dispatch Area Expansion (CRR Project) - $100,000 • 12th Street Garage-Elevator Replacement (CRR Project) - $250,000 • 12th Street Garage-Roof Renewal (CRR Project) - $64,000 • 1755 Meridian Avenue-2nd Floor Parking Office Security Enclosure (CRR Project) - $35,000 • 17th Street Garage-Roofing Repairs (CRR Project)- $30,000 • 17th Street Garage-Generator replacement (CRR Project) - $120,000 Page 1358 of 2228 FY 2020 Tentative Capital Budget and FY 2020— 2024 CIP September 11, 2019 Page 15 of 29 • 42nd Street Garage-Generator Replacement (CRR Project) - $71,000 • 42nd Street Garage-Replacement of Interior Drainage Pipes (CRR Project) - $34,000 • Citywide Parking Lots-Seal Coating (CRR Project) - $100,000 • Citywide Parking Lot Improvements (CRR Project) - $150,000 • 13th Street Parking Garage Elevator (CRR Project) - $140,500 • De-appropriation of funding remaining within the 17th Street Parking Garage Elevator project, as it will be completed with savings (CRR Project) - $140,500 Fleet Management Fund • FY 2020 General Fund Vehicle/Equipment Replacement- $7,468,000 Communications Fund • Defunding Public Safety Radio and Viper System project, as this project was approved to be funded using G.O. Bond dollars - $1,433,728 The proiects below were added to the CIP after the final budget briefing held on 7/26/19: Community Development Block Grant (CDBG) • Biscayne Beach House Affordable Housing property at 795 81St Street)-$396,037 (added based on approval of the FY 2020 CDBG Entitlement Fund allocations approved by Commission through Resolution 2019-30812) 7th Street Garage • 72nd Street Recreation Center (GOB Project#1) - $128,296 (added per 7/19/2019 FCWPC discussion) Home Investment Partnership Program (HOME) • Biscayne Beach House (Affordable Housing property at 795 81st Street) - $271,000 (added based on approval of the FY 2020 HOME Entitlement Fund allocations approved by Commission through Resolution 2019-30812) Parking Capital Not Bonds • 72nd Street Recreation Center (GOB Project#1) - $10,471,704 (added per 7/19/2019 FCWPC discussion) Capital Projects Financed by Other Funds • Added $20,000 to the Sunset Islands 1&2 Guardhouse project to increase the budget based on additional Homeowners' Association contribution for architectural and engineering services related to this project Pay-As-You-Go (PAYGO) Fund • Removed FY 2020 and FY 2021 programmed amounts for the Flamingo Neighborhood Reforestation project, the Nautilus Hurricane Reforestation project and the Lake Pancoast Reforestation project, as these areas will be covered within project#68219- GO#33 Street Tree Master Plan funding Page 1359 of 2228 FY 2020 Tentative Capital Budget and FY 2020— 2024 CIP September 11, 2019 Page 16 of 29 Miami-Dade County Inter-Local Agreement (Storm Water/General Capital Projects) Fund • Replaced $7,000,000 of recommended funding for Indian Creek Street Drainage Improvements, in FY 2020, with $5,593,058, in FY 2019, based on approval of the 8th Capital Budget Amendment at the July 31, 2019 Commission meeting via Resolution 2019-30929 • Added $1,293,847 to the Palm & Hibiscus Island Enhancement project in order to fund the expanded scope of the project to provide drain inlets within qualifying properties on both Palm & Hibiscus Islands. Parking Capital Not Bonds • Transferred $140,500 from the 42nd Street Garage Elevator Replacement project to the 13th Street Parking Garage Elevator project, as the 13th St. project is in in need of additional funding and the 42nd Street project will be completed with savings. The Capital Budget for FY 2020 totals $88,171,516 and will be appropriated on October 1, 2019 when approved by the City Commission. Projects will address many needs in different areas of the City including: neighborhood enhancements such as landscaping and sidewalk restoration; traffic calming; roadway and bridge resurfacing and reconstruction; water, sewer, and drainage system improvements; park construction, renovations and upgrades; renovations of seawalls; parking lot and garage renovations, construction/renovations of public facilities; and vehicle replacement. The following tables summarize the capital expenditures by funding and program source. FUNDING SOURCE FY 2020 Water 8 Sewer Bonds 21,934,267 PROGRAM FY 2020 Storrmseter Bonds 2017 19.576,375 Parking Capital Not Bonds 11,817,499 Utilities 31,460,117 Fleet Management 7,468,000 Streets/Sidewalks/Streetscapes 20,216,972 Stornmeter Projects-MDC ILA 6,593,847 Parking Garages 12,683,000 Water&Sewer Capital Projects 4,580,600 Equipment 7,038,718 Pay-As-You-Go 3,227.257 Storn'rwter Capital Projects 2,500,000 Seawalls 5,000,000 Resort Tax 1%-Mid Beach Quality of Life 2298,590 Renewal&Replacement 2,942,000_ Resort Tax 1%-North Beach Quality of Life 1,429,000 Parks 2,675,770 Resort Tax 1%-South Beach Quality of Life 1,414,000 Transit/Transportation 2,291,825 Capital Projects Not Financed by Bonds 1,270.000 Bridges 1.131,077 Capital Renewal&Replacement 902.000 South Pointe RDA 650,000 General Public Buildings 875,037 Local Option Gas Tax 540,000 Street Lighting 600.000 Parking Bonds 2010 463,205 Golf Courses 545,000 Transportation 448,625 Parking Lots 250,000 Community Development Block Grant 396,037 Environmental 250,000 7th Street Garage ^� 337.296 FIOME fnvest Partnerships Program 271,000 Convention Center 212,000 RDA City Center Renewal&Replacement _4 214,619 Total Proposed Appropriations as of 9/30/19 68,171,616 Convention Center Projects 212.000 Half Cent Transit Surtax 204,200 Sanitation Projects 200,000 RDA Garage(Anchor) 177,000 Mani Dade County Interlocal CDT/RTAX 170,000 Non-TIF RDA 153,381 Pennsyhania Ave.Garage 120,000 South Pointe Capital 35,000 Communications (1,432.282) Total Proposed Appropriations as of 9130/19 88,171,516 Page 1360 of 2228 FY 2020 Tentative Capital Budget and FY 2020- 2024 C/P September 11, 2019 Page 17 of 29 The FY 2020-2024 Capital Improvement Plan by Funding Summary (Attachment A) sorts the projects in the FY 2020-2024 CIP and FY 2020 Capital Budget by funding source (revenue). As seen in the following graph, the Water & Sewer Bonds bring in the largest portion (25%) of revenue for FY 2020 capital projects, followed by Storm Water Bonds at 23%. FY 2020 SOURCES OF FUNDS: $88.2 MIWON ox 12% 111M1111 . •.'.., ,. .�•.,�..* . , .d.. q:q .' The FY 2020 - 2024 Capital Improvement Plan by Program (Attachment B) sorts the projects in the FY 2020 - 2024 CIP and FY 2020 Capital Budget by Program (expenditure). The largest proposed investments are in utilities (36%), followed by streets/sidewalks/streetscapes at 23%. FY 2020 CAPITAL BUDGET: $88.2 MIWON • .1111.11111 • - c 3 Page 1361 of 2228 FY 2020 Tentative Capital Budget and FY 2020— 2024 ClP September 11, 2019 Page 18 of 29 PROJECT HIGHLIGHTS BY PROGRAM AREA Art in Public Places (AIPP) The Art in Public Places (AiPP) Ordinance (Ordinance No. 95-2985) was adopted in 1995. The Ordinance was created to "enhance the aesthetic environment of the City of Miami Beach by including works of art on public property within the City and in City construction projects." The AiPP Ordinance was amended in May 2004 to clarify the definition of terms for eligible construction projects for funding, as well as the policies and procedures for appropriations. The AiPP Guidelines were also adopted by the City Commission at that time. The AiPP program is currently funded by 1.5% of all hard costs of City projects, including new construction, additions, and costs for construction of joint private/public projects. The fund is used for the commission or acquisition of works of art; conservation and maintenance of works of art; research and evaluation of works of art; printing and distribution of related materials; and administration. The City Commission will be voting on proposed amendments to the Art in Public Places Ordinance at the September 11, 2019 Commission meeting. The amendment to the current ordinance would expand the definition of" City Construction Project" to include baywaiks, beachwalks, streetscape beautification projects (resurfacing, curbs, gutters, pavers, sidewalks, landscaping, lighting, bus shelters, bus benches, street furniture, signage and similar above ground improvements); amend the dollar threshold therein from $ 500,000 to $ 250,000 for the projects subject to the provisions of Art in Public Places; and amend the amount to be appropriated to Art in Public Places from not less than 1. 5 percent, to not less than 2 percent. Prior Years include $8.3 million in funding for the Miami Beach Convention Center, Fire Station #2, Flamingo Park, Lummus Park, and Soundscape Park. Bridges Bridge repair projects are prioritized and funded based upon inspections by the Florida Department of Transportation, which ensures the safety of all bridges statewide. Other factors are also considered when determining the condition of a bridge, such as its load capacity. It is the City's responsibility to ensure that bridges are repaired in order to be safe for the motoring public. Pedestrian bridges are also included in this category,which is the City's responsibility to maintain. The One-Year FY 2020 Capital Budget appropriates $706,077 for Citywide Bridges, beginning with the lowest rated bridge at 77th Street over Biscayne Point Canal and $425,000 for painting and lighting of bridges in North Beach. Prior Years include $7.1 million for the West Avenue Bridge over Collins Canal; $1.2 million for Painting and Lighting of Bridges in North Beach; $480,000 for the 41st Street Bridges Repair; $280,000 for Citywide Bridge Repairs and $180,000 for the Lighting and Painting of the 81St Street Pedestrian Bridge. Future funding needs include $4.3 million for repairs of bridges citywide. Convention Center The Miami Beach Convention Center(MBCC) has been a significant factor in the economic impact of Miami Beach and the greater Miami-Dade County for over fifty years. It served as the site where Cassius Clay (later known as Muhammad Ali) defeated Sonny Liston for his first Page 1362 of 2228 FY 2020 Tentative Capital Budget and FY 2020— 2024 CIP September 11, 2019 Page 19 of 29 Heavyweight Championship of the World in 1964. In 1968, the Miami Beach Convention Center hosted the Republican National Convention and more than 20,000 delegates; while in 1972, more than 45,000 delegates visited the facility during both the Republican and Democratic National Conventions. Originally built in 1957, the MBCC encompassed 108,000 square feet. In 1968, an additional 130,500 square feet of exhibit space was added, with additional support facilities subsequently constructed in 1974. In 1986, as the demand for exhibition space increased, the facility underwent a $92 million renovation and doubled in size to its current footprint. The expanded MBCC opened in 1989. At that time, a master plan was also developed for the convention center complex. Since that time, the facility has received over$50 million in continuing upgrades, including complete renovations of all restrooms, full carpet replacement, and installation of a state-of-the-art telecommunications and networking infrastructure. Since the 1989 MBCC renovation, significant changes have taken place in the convention and tradeshow industry. The number of events, attendance, and space needs have increased on an annual basis industry-wide. The economic impact of the convention and tradeshow has also increased over time. Many cities have responded to this industry growth by increasing the size of their convention centers and by adding amenities such as increased meeting space, additional parking, general session space, various technological amenities, and related features in an effort to address industry trends. Changes in how a competitive hotel package and cultural offerings are viewed by event planners have also led to significant development in areas adjacent to the convention center in major markets throughout the country. Large headquarter hotels have been developed, and efforts to create walkable restaurant/retail environments surrounding convention centers have also been undertaken. The primary objectives of the master plan project are improvements to the MBCC and redevelopment of its surrounding area that are supported by market demand and are necessary to facilitate the ability of the MBCC to attract high impact conventions and tradeshows in an increasingly competitive environment. A report prepared by Convention Sports & Leisure (CSL) commissioned by the Greater Miami Convention and Visitors Bureau (GMCVB) determined that the MBCC shall serve as the region's convention center given its geographic draw, and no new facility should be planned elsewhere in Miami-Dade County. The report further determined that improvements to the MBCC, including a multi-purpose general assembly/banquet hall, should be made to increase its marketability and attract high-end conventions. The expansion and renovation of the existing MBCC includes an expansion to 1.4 million square feet, the re-orientation of the four exhibit halls, facade modifications, two separate loading docks on opposite ends of the building with 32 dock spaces, site improvements along the canal and roadways, the addition of a Grand Lobby, 1 Grand Ballroom and 4 junior ballrooms, including the rooftop 'Sunset Vista Ballroom', 10,000 square foot production kitchen, 1.61 miles of fiber optic cabling and 480 miles of copper wiring to support IT communications, 84 meeting rooms with free Wi-Fi, and 800 parking spaces located on the roof. The new MBCC re-orients the halls in an East/West direction with the primary access from Convention Center Drive, although Washington Avenue will serve as a secondary means of entry. The project includes substantial improvements to the north of the property. The new addition at the northern portion of the property features an enclosed ground floor parking area and truck loading and delivery area. Above this is the multi-story Grand Ballroom, offering two outdoor Page 1363 of 2228 FY 2020 Tentative Capital Budget and FY 2020— 2024 CIP September 11, 2019 Page 20 of 29 patios spaces, with views of the beautified 3.8 acres of Collins Canal Park that spans along Collins Canal and features the restored historic Carl Fisher Clubhouse, with a completion date of November 2019. This addition will create a new internalized loading area and includes two helix ramping entrance accesses to the roof level parking. The Washington Avenue elevation will be predominately pedestrian in nature with the elimination of the visitor drop-off and cab cueing areas. The streetscape modifications have included a green edge along the avenue with native shade trees to promote a more pedestrian friendly experience. Convention Center Drive becomes the main access point for vehicular access and for the visitor and shared ride drop-off areas. Modifications include a new median along Convention Center Drive and 19th Street creating a more sophisticated streetscape and a more celebrated boulevard experience. The Collins Canal Park walk will be substantially improved and will create a softer northern edge to the MBCC, with a continued path starting at the Holocaust Memorial, continuing through the Botanical Gardens, into Collins Canal Park and ending at the Bass Museum and Collins Park to connect multiple green spaces across multiple city blocks. The project also includes sizeable Art in Public Places installations including pieces by six internationally recognized artists such as Ellen Harvey, Sarah Morris and Joseph Kosuth, with a budget of $7.1M for expected completion of the final project in Fall 2019, this collection is the largest collection of single curated public art in the United States. The MBCC is now substantially complete and welcoming new and repeat business utilizing all four exhibit halls. Art Basel 2018 welcomed its highest number of attendees and the facilities first gala-the Baptist Health Gala, was one of the largest galas in Miami-Dade and received accolades from local and regional influencers. On July 25, 2018, Resolution 2018-30438 was passed and adopted by the City Commission. This resolution called for a special election on November 6, 2018 for the purpose of submitting to the electorate of the City of Miami Beach, a ballot question regarding a 99-year lease of a 2.6-acre property to MB Mixed Use Investment, LLC, requiring the construction/operation of an 800-room hotel connected to the Convention Center per Resolution 2018-30425. The property is located at the northeast corner of 17th Street and Convention Center Drive. On November 6, 2018, the citizens of the City of Miami Beach voted in favor of the MBCC Hotel. The development of the hotel has been approved by the Design Review Board and is prepared for the official ground breaking in 2019. In FY 2019, the City restructured the financial terms with MBCC F&B vendor, Centerplate, to provide for the City to receive 95% of the net operating profits of the catering and F&B operations at the MBCC (after payment of all operating expenses), and (2) extended the term of the City's agreement with Centerplate to an additional two years. During FY 2019, significant bookings secured for future years include: Million Dollar Roundtable, SuperCon, National Automated Clearing House Association - The Electronics Payments Association (NACHA) American Society for Aesthetic Plastic Surgery, Association Of The Nonwoven Fabrics Industry and the Miami Auto Show. The One-Year FY 2020 Capital Budget totals $212,000 for Convention Center Park (Fitness Area). Prior Years include $615.4 million for the Convention Center Renovation; $9.2 million for the Convention Center Park; $3.9 million for the Carl Fisher Clubhouse renovation; $771,000 for the Convention Center Garage Equipment and $600,000 for legal, consulting, and resident-surveying Page 1364 of 2228 FY 2020 Tentative Capital Budget and FY 2020— 2024 C/P September 11, 2019 Page 21 of 29 services related to a Convention Center hotel. Environmental Environmental projects in the CIP cover a range of projects including beach access gates, canal enhancement projects, tidal flooding mitigation, lighting for the baywalk, recreational greenways, and remediation. The One-Year FY 2020 Capital Budget provides $250,000 in funding for surveying and permitting costs related to the Waterway Restoration G.O. Bond project. Prior Years include $2.7 million for the Middle Beach Recreational Corridor Phase III; $1.1 million for Maurice Gibb Park soil remediation; $386,000 for Baywalk Phase 2; $310,000 for the Baywalk from 10th to 12th Street; $111,000 for Fleet Management Facility Remediation and $30,000 for the Lake Pancoast Mangrove Planter (formerly known as the Indian Creek Living Shoreline). Future funding includes $6.0 million in G.O. Bond funding for the Waterway Restoration project and the Lake Pancoast Mangrove Planter in the amount of$1,450,000, which is programmed for FY 2021. Equipment The capital equipment section of the CIP includes the purchase of major capital equipment, including property management, fleet, lighting, and information technology equipment related acquisitions. The One-Year FY 2020 Capital Budget funds $7.5 million for annual vehicle/equipment replacement; $903,000 for Security Cameras on Beachwalk (23rd to 46th St); $100,000 for the Smart Building Automation System and defunding of the Public Safety Radio & Viper system amounting to $1,432,282, which has been funded by the G.O. Bond. Prior Years include $10.6 million for Fleet vehicle/equipment replacement; $12.1 million for the Public Safety Radio System (G.O. Bond project), and other major projects such as $2.8 million for Convention Center FF&E; $1.9 million for License Plate Readers (G.O. Bond project); $1.7 million for replacement of the Permits Plus Software; $1.5 million for cameras in the Entertainment District (G.O. Bond project); $825,000 for Cameras in the Business District (G.O. Bond project); and$400,000 for cameras on the Beachwalk(G.O. Bond project). An additional 15 miscellaneous projects totaling $2.3 million were also funded within this program. Future funding needs total $31.8 million for various projects, primarily related to vehicle and equipment replacement needs. General Public Buildings The One-Year FY 2020 Capital Budget includes $667,037 in funding necessary for repairs at the Biscayne Beach affordable housing property that was acquired by the City in FY 2019; $188,000 for North Shore Bandshell Rear Seating and $20,000 in additional funding for the Sunset Islands 1& 2 Guardhouse. Prior Years include $7.5 million for the Bass Museum space expansion; $7.0 million for Fire Station #1 (G.O. Bond project); $2.7 million for the Marine Patrol Facility (G.O. Bond project); Page 1365 of 2228 FY 2020 Tentative Capital Budget and FY 2020— 2024 CIP September 11, 2019 Page 22 of 29 $1.3 million for the Bayshore Green Waste Facility; $1.3 million for Lottie Apartments; $1.1 million for Biscayne Beach affordable housing property; $1.0 million for North Shore Park Restrooms; $648,225 for Sunset Islands 1&2 Guardhouse; $668,000 for the North Shore Bandshell Canopy, $553,467 for the North Beach Yard and $829,898 for 3 miscellaneous projects. Future programmed funding includes $5.3 million for creating a Public Works facility at a vacant/unused pump station; $1 million for Greenspace Facility Renovation, $310,000 for North Shore Bandshell Rear Canopy, along with future tranches of various GOB projects. Golf Courses The City operates the Miami Beach Golf Club and the Normandy Shores Golf Club. The golf clubs are funded from the General Fund with all revenues generated going to the City to off-set operational expenditures and debt service. The City's golf courses/clubs are managed and operated by Professional Course Management (PCM) on behalf of the City. The One-Year FY 2020 Capital Budget totals $245,000 for the Miami Beach Golf Club Roof; $200,000 for the Miami Beach Golf Club Storage Tank and $100,000 for the Miami Beach Golf Course Irrigation Pump House Renovation. Prior Years include $5.5 million for renovations to the Community Park (Par 3); $124,000 for the Miami Beach Golf Course Practice Tee Renovation and $65,000 for the BGC Golf Cart Staging Area project. Future funding needs include$5.0 million for the Miami Beach Golf Course Renovation; $175,000 for the Normandy Shores Golf Club Roof; $80,000 for the Miami Beach Golf Club Driving Range Lighting project and $50,000 for the Normandy Shores Golf Club Pumps. Monuments There are numerous monuments throughout the City, with of many of them being historic. In 2009, the City conducted a comprehensive assessment of necessary repairs. Prior Years include $279,000 for the Alton Road Fountain at 20th Street project and $322,000 for the Flagler Monument Solar Illumination project. Future funding needs include $350,000 for the Water Tower Restoration on Star Island and $62,000 for a World War Memorial, Parking, Parking Garages, and Parking Lots The City manages and operates 67 surface parking lots and 11 garages. There is a total of 9,677 metered spaces both on-and off-street and 23 residential parking permit zones citywide. The CIP programs provide funding for on-going maintenance of facilities, which includes renovation of parking lots that are anticipated to provide additional parking spaces when complete. Prior Years for the Parking Garage/Parking programs include $27.6 million for the Collins Park garage; $14.3 million for the garage at Collins Avenue and 13th Street; $4.0 million for 17th Street Parking Garage Coating; $3.8 million for Revenue Control Systems; $3.0 million for Penrods at 1 Ocean Drive Parking Lot; $1.9 million for the 17th Street Garage Roof and Deck; $1.8 million for the 16'h Street Garage Roof and Deck; $1.4 million for Garage Security Camera System; and 24 Page 1366 of 2228 FY 2020 Tentative Capital Budget and FY 2020— 2024 C!P September 11, 2019 Page 23 of 29 renewal and replacement projects totaling $6.1 million. The One-Year FY 2020 Capital Budget includes$10.6 million for the 72nd Street Park and Parking Structure; $855,000 for Garage License Plate Recognition Devices; and 18 renewal and replacement projects totaling $1.5 million. Future funding needs for the Parking Garage program total $32.2 million for various projects. Parks The City maintains the appearance of the gateways to the City, all municipal parks, buildings, grounds, and City-controlled medians, swales, and landscape areas, including management of the City's urban forest and the landscape maintenance contracts for the entire City's parking facilities. The One-Year FY 2020 Capital Budget for Parks totals $2.7 million and includes $1.25 million for the North Beach Oceanside Park redevelopment; $857,680 for Polo Park to fund sports lighting and create a multi-use soccer field; $250,000 for Super Bowl landscaping and park improvements; $168,090 for Indian Beach Park playground expansion, and $150,000 for Beachwalk tree wells from 14'n to 22nd Street. Prior Years funding for multiple open projects total $149.8 million and includes major projects such as $17.9 million for Flamingo Park; $15.7 million for the Community Park; $15.4 million for Flamingo Park & Youth Center (G.O. Bond project) and $10.8 million for 72nd Street Recreation Center. Prior Years also includes 15 other G.O. Bond projects totaling $41.2 million and 38 other projects totaling $47.6 million. Future funding needs reflect the five-year capital plan for the Parks department in addition to future tranches for various GOB projects. Renewal and Replacement FY 2012 was the first year that new and existing capital renewal and replacement projects were included in the CIP and Capital Budget. Prior to FY 2005, the City made significant investment in the routine maintenance of its assets, as well as funding major capital projects bringing online miles of sidewalks and curbing, additional streetlights, new parks and park facilities, new Fire station facilities, etc. However, maintenance of the capital investments competed with General Fund services and routine maintenance with the result that funding levels did not provide for major capital renewal and replacement projects. As a result, these projects often were deferred many years beyond the useful life of the capital component requiring replacement or renewal, and in some cases, until the point where an entire capital project was required for major improvements. To ensure that renewal and replacement of General Fund assets were funded and addressed when needed, in FY 2005, the City of Miami Beach established a dedicated millage for renewal and replacement funding to be used for capital projects that extended the useful life of the City's General Fund assets to be used exclusively to provide for renewal and replacement of capital items related to facilities and infrastructure over and above routine maintenance. The following restrictions regarding the fund were established at the time that the dedicated funding was created: Page 1367 of 2228 FY 2020 Tentative Capital Budget and FY 2020— 2024 C/P September 11, 2019 Page 24 of 29 • Projects must meet the following criteria for funding: o Extend the useful life of a City of Miami Beach General Fund asset by at least 5 years with a threshold value of at least $25,000; for example the replacement a major component of the asset such as roofs, HVAC systems, electrical systems, fire alarm systems, sprinkler systems that due to significant deterioration would constrain the remaining useful life of the asset, OR o Significantly reduce future maintenance cost over the remaining life of the asset providing for a reduction in future maintenance costs that are greater than the cost of the project • The Mayor and Commission may authorize additional uses of the funds for unforeseen or unanticipated events affecting life, health, property or public safety subject to a five- sevenths (5/7) vote • Appropriation of project specific expenditures from the General Fund Capital Renewal and Replacement Fund shall be included in the City Manager's annual proposed budget, to be approved by the Mayor and City Commission annually during the City's second public hearing on the budget • Interest earnings that accrue in the General Fund Capital Renewal and Replacement Fund shall be included in the appropriation for the Fund in the following fiscal year • Changes among project specific appropriations may be authorized by the City Manager to the extent that no new projects are added and the total annual allocation is not exceeded • During a fiscal year, changes to the total allocation and changes to the list of projects to be funded from the General Fund Capital Renewal and Replacement Fund shall require prior approval and authorization by a majority of the City Commission. Excess project specific appropriations not required will be available for re-appropriation the following year • Project specific appropriations that are not expended in a given fiscal year shall remain in the General Fund Capital Renewal and Replacement Fund for the life of the project At the same time, the City established a systematic approach to identify renewal and replacement needs. Facilities are inspected at least once every five years to determine current needs as well as projected replacement dates for all major components. A Facility Condition Index Rating (FCI) is assigned to each facility based on the total value of existing requirements divided by the current replacement value of the building. Based on industry standards ratings are assigned as follows: • 0.00 to 0.10 Excellent • 0.11 to 0.21 Good • 0.122 to 0.32 Fair • Greater than 0.33 Poor Facilities that have high public usage have a goal of "Excellent," while all other facilities have a goal of "Good." Renewal and replacement projects for facilities that are not supported by the General Fund are funded from available cash balances in their respective Internal Service or Enterprise Funds, e.g. Fleet, Sanitation, Property Management, Water, Sewer, Storm Water, Parking, and Convention Center. City Center Redevelopment Area (RDA) projects are funded through the City Center RDA budget. The current dedicated millage of 0.0235 mills (same as in FY 2019) is projected to generate $768,000 for the General Fund Capital Renewal and Replacement Fund. Internal Service Funds, Enterprise Funds and Special Revenue Funds also provide sources of funding for non-General Fund Renewal and Replacement Projects. The One-Year FY 2020 Capital Budget has 18 Page 1368 of 2228 FY 2020 Tentative Capital Budget and FY 2020- 2024 C/P September 11, 2019 Page 25 of 29 projects totaling $2.9 million. Prior year appropriations total $25.0 million. Seawalls The City of Miami Beach is part of a barrier island and seawalls perform an important function in improving water quality and protecting upland structures such as roads and utilities. The One-Year FY 2020 Capital Budget totals $5.0 million, with $5.0 million programmed annually from FY 2021 to FY 2024. Prior Years funding for multiple open projects totals $28.3 million and includes $8.0 million for Seawalls & Shorelines throughout the City (G.O. Bond project); $5.5 million for enhancements at Collins Canal, $2.6 million for seawall repair by the Fleet Management facility, $1.8 million for the Convention Center Drive to Washington project, $1.7 million for the Biscayne Bay Street End project (Phase 2), and $1.6 million for the Dade Boulevard - Washington Avenue project. Prior Years also includes 13 other projects totaling $7.2 million. Street/Sidewalk/Streetscape Improvements Projects within neighborhood areas are combined to create a single project that addresses the neighborhood needs for infrastructure upgrades(including upgrades to underground water, sewer and storm water infrastructure), traffic flow improvements, street lighting, and landscaping enhancements. The One-Year FY 2020 Capital Budget totals $20.2 million, primarily for the 1st Street-Alton Road to Washington project totaling $24.07 million, offset by $6.97 million from the defunding of Flamingo 10G-6 St. ROW Improvements project, which is now a part of the Flamingo Park Neighborhood project. The FY 2020 budget also includes $1.29 million in increased funding for the Palm and Hibiscus Island Enhancement project and $727,000 for Indian Creek Landscaping and Irrigation. Prior Year appropriations for open projects total $429.2 million and include several key projects such as West Avenue, Venetian Neighborhood-Islands, Palm and Hibiscus Island, Lincoln Road Washington Ave to Lenox Ave, Bayshore Neighborhood, City Center Commercial District BP9B, and Bay Road. Future funding needs total $667.3 million inclusive of future tranches for various GOB projects. Street Lighting Improving lighting throughout the City consistent with Lighting and Crime Prevention Through Environmental Design (CPTED) principles was prioritized during the FY 2016 budget process. The One-Year FY 2020 Capital Budget totals $600,000 for a Smart Lighting Master Plan, with $600,000 programmed each year in the future. Prior Years include $5.0 million for Street Lighting Improvements(G.O. Bond project); $1.9 million for the Smart Lighting Master Plan; $1.6 million for Streetlight Improvements; $665,625 for Beachwalk Lighting Retrofit; $450,000 for Citywide Parking Lot Lighting; $168,060 for Aluminum Street Lighting Pole Replacement; $148,779 for the 5th Street Flyover lighting and $139,000 for Normandy Isle-Marseille Lighting. Page 1369 of 2228 FY 2020 Tentative Capital Budget and FY 2020— 2024 CIP September 11, 2019 Page 26 of 29 Other future funding needs include $12.5 million each year, beginning in FY 2022, for Street Lighting Improvements; $600,000 each year, beginning in FY 2021, for the Smart Lighting Master Plan, along with future tranches of GOB projects. Transit/Transportation The City is responsible for the management of transportation and traffic engineering services, including coordination with the County for the provision of transit service; coordination and funding of the South Beach Local, the most successful bus circulator in the County; design and implementation of traffic mobility improvements; coordination of the shared-bike program; and implementation of the Bikeways Master Plan. Along with, and related to growth management, traffic flow continues to be one of our community's major concerns. The One-Year FY 2020 Capital Budget totals $2.3 million, which primarily includes $650,000 for South Beach pedestrian zones; $540,000 for Alton Road and 16th Street intersection improvements; $449,000 for entrance signs to North Beach and $448,625 for the North Beach Neighborhood Greenways-Phasel. Prior Years include $42.5 million for the Transportation Capital Initiative and $18.8 million for the Intelligent Transportation System. An additional 24 projects totaling $14.9 million were also funded within this program. Future funding needs total $17.2 million inclusive of future tranches for various GOB projects. Utilities The City is responsible for the maintenance and operation of the water and sewer system that provides reliable and high quality water and a reliable sanitary sewer system that protects public health and safety; and complies with all federal, state, and local regulations. The City purchases wholesale water from Miami-Dade County for distribution within the City and the City also operates and maintains the storm water collection and conveyance system that protects public health and safety and complies with all federal, state, and local regulations. The One-Year FY 2020 Capital Budget totals $31.5 million and includes $17.0 million for Water and Wastewater Main Rehabilitation; $4.5 million for the water meter replacement program, $3.25 million for SCADA and PLC systems; $2.0 million for Storm Water Outfalls; $1.5 million for Wastewater Manhole Rehabilitation; $1.0 million for Water Pump Station Improvements; $850,000 for Sewer Pump Station Odor Control; $850,000 for the Bioswale Pilot Project at 59th Street and Alton Road; $700,000 for Storm Water Pump Station # 18 Improvements; $500,000 for DERM & EPA Consent Decree, and defunding of the Sunset Harbour Pump Station Upgrades amounting to $1.19 million, as no further Storm Water funding is required at this time. Future funding needs total $245.3 million for various projects. FINANCING Several capital financing transactions are reflected in the CIP including: General Obligation Bonds, Storm Water Revenue Bonds, Water and Sewer Revenue Bonds, Gulf Breeze Loans, and an Equipment Master Lease. Page 1370 of 2228 FY 2020 Tentative Capital Budget and FY 2020— 2024 CIP September 11, 2019 Page 27 of 29 In 1995, the City issued $59 million in Water and Sewer Revenue Bonds. In 1997, the City paid $15 million for the 1996 authorized General Obligation Bonds to construct, renovate and rebuild parks and recreation facilities within the City's park system. In 2000,the City issued the initial $30 million of the authorized$92 million 1999 General Obligation Bond. These funds were issued to expand, renovate, and improve fire stations and related facilities; improve recreation and maintenance facilities for parks and beaches: and improve neighborhood infrastructure. In 2000, the City also issued$54,310,000 in Water and Sewer Bonds and $52,170,000 in Storm Water Revenue Bonds. In addition, the City was granted a $4 million Section 108 U.S. Housing and Urban Development Loan for improvements to neighborhood streets, North Shore Park and Youth Center. In 2001, the City executed loan agreements with the City of Gulf Breeze, Florida, providing $15 million for the renovation and improvement of two City owned golf courses and their related facilities. The City issued the remaining $62,465,000 of the referendum-approved $92 million General Obligation bonds in July 2003 for improving neighborhood infrastructure in the City. Further, in 2006 and 2010, the City executed loan agreements with the City of Gulf Breeze, Florida, providing an additional $24 million and $30 million for water and sewer projects, respectively. In 2006 and 2010, the City executed loan agreements with the City of Gulf Breeze, Florida, providing an additional $24 million and $30 million for water and sewer projects, respectively. In FY 2009, a line of credit was issued and was being used to fund projects in advance of issuing water and sewer and storm water bonds. The City uses this line of credit in order to have the necessary funding capacity to enter into new projects while allowing time to both build the necessary rate capacity to issue additional tax-exempt bonds. This phased approach provides the City with more time to refine the cost estimates for projects planned to be in construction prior to issuance of bonds. In FY 2012, approximately $50 million in storm water bonds were issued replacing funding for projects previously funded by the line of credit. In FY 2015, approximately $100 million in storm water bonds were issued as part of the first of three $100 million bonds to upgrade the City's storm water system. On December 15, 2015, the City issued $164,920,000 in Resort Tax Revenue Bonds, Series 2015. These Series of bonds were issued by the City for the purpose of providing funds to (1) finance a portion of the costs of acquiring and constructing renovations to the Miami Beach Convention Center and related improvements, and (ii) pay the costs of issuing the Series 2015 bonds. The City also issued $58,825,000 in Parking Revenue Bonds, Series 2015. These Series of bonds were issued by the City for the purpose of providing funds to (i) finance a portion of the costs of acquiring and constructing a new parking facility and improvements to a surface parking lot to serve the City's Convention Center, and (ii) pay the cost of issuing the Series 2015 bonds. Lastly,the RDA Agency issued $286,245,000 in Tax Increment Revenue and Revenue Refunding Bonds, Series 2015A and $35,850,000 in Tax Increment Revenue Refunding Bonds, Taxable Series 2015B. The Series 2015A bonds were used, together with certain other legally available moneys of the Agency, to (i) provide for the current refunding of all the outstanding Series 2005B bonds, (ii) finance certain costs of acquiring and constructing renovations to the Miami Beach Convention Center and certain other improvements, and (iii) pay costs of issuance of the Series 2015 bond and refunding the outstanding Series 2005B bonds. The Series 2015B will be used to (i) provide for the advance refunding of all the outstanding Series 1998 bonds, (ii) provide for the current refunding of all the outstanding Series 2005A bonds, and (iii) pay costs of issuance of the Series 2015B bonds and refunding the outstanding Series 1998A bonds and the outstanding Series 2015A bonds, including the portion of the premium allocable to the Series 2015B bonds Page 1371 of 2228 FY 2020 Tentative Capital Budget and FY 2020- 2024 ClP September 11, 2019 Page 28 of 29 for the reserve policy. In fiscal year 2017, the City obtained a bank loan in the amount of $19.7 million to refund the outstanding taxable special obligation refunding bonds, Series 2005. This refinancing provided the City with a net present value savings of $1.5 million over five years. Subsequent to September 30, 2017, on December 14, 2017, the City issued at par value $115.2 million of Water and Sewer Revenue Bonds secured by the net revenues of the City's combined water and sewer system. The Series 2017 Bonds are being used for the purpose of providing funds to finance the cost of certain capital improvements as part of the City's multi-year program to upgrade the facilities and enhance the effectiveness and reliability of the Water and Sewer Utility as well as to provide current refunding and defeasance of all outstanding Series 2000 Bonds, prepayment of all outstanding Series 2006B-2 Bonds, and prepayment of all the outstanding Series 2006E Bonds The bonds are rated Aa3 by Moody's and AA- by Standard and Poor's. The Bonds have an all-inclusive true interest cost of 3.75% for 30 year fixed rate debt. The advance refunding generated $7.2 million in savings, with average annual savings of $550,000 in 2018—2030. The refinancing also restructured the debt to provide more overall level debt service, which reduces the impact of the additional debt service for capital improvements to ratepayers. On December 22, 2017, the City issued at par value $156.6 million of Storm Water Revenue Bonds secured by the net revenues of the City's storm water system. The Series 2017 Bonds are being used for the purpose of providing funds to finance a portion of the costs of certain capital improvements as part of the City's multi-year program to improve and enhance the effectiveness and reliability of the Storm Water Utility as well as provide for the advance 5 refunding and defeasance for a portion of the outstanding 2011A Bonds and 2011B Bonds. The City will provide for the refunded bonds to be redeemed on September 1, 2021 at a redemption price equal to the principal amount of the refunded bonds, without premium. The bonds are rated Aa3 by Moody's and AA- by Standard and Poor's. The Bonds have an all-inclusive true interest cost of 3.81% for 30 year fixed rate debt. The advance refunding generated $5.5 million in savings, with average annual savings of$230,000 in 2018— 2041. GENERAL OBLIGATION BOND PROJECTS On November 6, 2018, the citizens of the City of Miami Beach voted in favor of issuing $439 million in general obligation bonds ("G.O. Bonds") to: • Improve the City's police, fire, and public safety facilities, in addition to equipment, technology, and lighting to improve security throughout the City • Improve the City's parks, recreational and cultural facilities, inclusive of playgrounds, baywalks, beachwalks, waterways, landscaping, equipment, lighting, security, and parking related to such facilities • Improve the City's neighborhoods and infrastructure, including storm water and flooding mitigation projects, sidewalk and street renovation and repairs, protected bicycle lanes, pedestrian paths, landscaping, and lighting At the March 4, 2019 G.O. Bond workshop, the City Commission reviewed the proposed G.O. Bond Implementation Plan, which outlines the sequencing of the 57 approved projects. At the March 13, 2019 Commission Meeting, the City Commission approved the G.O. Bond execution Page 1372 of 2228 FY 2020 Tentative Capital Budget and FY 2020— 2024 C/P September 11, 2019 Page 29 of 29 plan for the first tranche and authorized the issuance of General Obligation Bonds, Series 2019, for the funding of these projects. The fourth amendment to the FY 2019 Capital Budget, which was approved at this meeting, allowed for the expedited funding of seven of these approved first tranche projects in the amount of$19,760,000. At the April 10, 2019 Commission Meeting, the City Commission approved the funding of the remaining $131,379,000 of tranche 1 projects, for a total of$151,139,000, as summarized below and detailed in attachment A. • 19 Parks projects totaling $86,733,000 • 11 Public Safety projects totaling $36,406,000 • 8 Neighborhood/Infrastructure projects totaling $28,000,000 In an effort to increase transparency and to provide detailed information on the G.O. Bond program, the City recently launched a robust website which provides a wealth of information on the status of each project, including an interactive dashboard that provides real-time information at the users' fingertips. For more information, go to https://www.gombinfo.com/. CONCLUSION The Administration recommends adopting the Tentative Capital Improvement Plan for FY 2020 - 2024 and adopting the City of Miami Beach Tentative Capital Budget for FY 2020. Attachment A— FY 2020-2024 Capital Improvement Plan Funding Summary Attachment B — FY 2020-2024 Capital Improvement Plan by Program JLM/JW/TOS Page 1373 of 2228 • suNDAy MOST 2S 2019 24NE I NEIGHBORS I MIAMIHENALDIOA1 MIAMi BEACH CITY OF MIAMI BEACH NOTICE OF PUBLIC HEARINGS SEPTEMBER 11, 2019 NOTICE IS HEREBY given that the following public hearings will be heard by the Mayor and City Commissioners of the City of Miami Beach, Florida, in the Commission Chamber, Third Floor, City Hall, 1700 Convention Center Drive, Miami Beach, Florida, on September 11, 2019, at the time listed, or as soon thereafter as the matter can be heard: 5:Q1 p.m.First Reading Public Hearing A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH,FLORIDA,ADOPTING:1)THE TENTATIVE AD VALOREM MILLAGE OF 5-7288 MILLS FOR FISCAL YEAR(FY)2020 FOR GENERAL OPERATING PURPOSES,WHICH IS THREE AND TWO TENTHS PERCENT(3.2%)MORE THAN THE "ROLLED-BACK"RATE OF 5.5522 MILLS:AND 2)THE DEBT SERVICE MILLAGE RATE OF 0.2933 MILLS,SUBJECT TO A SECOND PUBLIC HEARING TO CONSIDER THE MILLAGE RATE FOR FY 2020 ON WEDNESDAY,SEPTEMBER 25,2019,AT 5:01 P.M. This Resolution is being heard pursuant to Sections 166.041 and 200.065 F.S.inquiries may be directed to the Budget and Performance Improvement Office at 305.673.7510. .:01 p.m.First Reading Public Hearing A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH,FLORIDA,ADOPTING TENTATIVE BUDGETS FOR THE GENERAL, G.O. DEBT SERVICE,RDA AD VALOREM TAXES,ENTERPRISE,INTERNAL SERVICE,AND SPECIAL REVENUE FUNDS FOR FISCAL YEAR(FY)2020,SUBJECT TO A SECOND PUBLIC HEARING SCHEDULED ON WEDNESDAY, SEPTEMBER 25, 2019, AT 5:01 P.M. This Resolution is being heard pursuant to Sections 166.041 and 200.065 F.S.Inquiries may be directed to the Budget and Performance Improvement Office at 305.673.7510. 5:02 P.m.First Reading Public Hearing A RESOLUTION OF THE BOARD OF DIRECTORS OF THE NORMANDY SHORES LOCAL GOVERNMENT NEIGHBORHOOD IMPROVEMENT DISTRICT ADOPTING THE TENTATIVE AD VALOREM MILLAGE RATE OF 0.8161 MILLS FOR FISCAL YEAR (FY) 2020 FOR THE NORMANDY SHORES LOCAL GOVERNMENT NEIGHBORHOOD IMPROVEMENT DISTRICT,WHICH IS FOUR AND FIVE TENTHS PERCENT(4.5%)LESS THAN THE"ROLLED-BACK"RATE OF 0.7810 MILLS, SUBJECT TO A SECOND PUBLIC HEARING SCHEDULED ON WEDNESDAY, SEPTEMBER 25, 2019, AT 5:02 P.M. This Resolution is being heard pursuant to Sections 166.041 and 200.065 F.S. Inquiries may be directed to the Budget and Performance Improvement Office at 305.673.7510. 5:02 P.m.First Reading Public Hearing A RESOLUTION OF THE BOARD OF DIRECTORS OF THE NORMANDY SHORES LOCAL GOVERNMENT NEIGHBORHOOD IMPROVEMENT DISTRICT ADOPTING THE TENTATIVE OPERATING BUDGET FOR FISCAL YEAR(FY)2020,SUBJECT TO A SECOND PUBLIC HEARING SCHEDULED ON WEDNESDAY, SEPTEMBER 25,2019,AT 5:02 P.M. This Resolution is being heard pursuant to Sections 166.041 and 200.065 F.S. Inquiries may be directed to the Budget and Performance improvement Office at 305.673.7510. 5:03 o.m,First Reading Public Hearing A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH,FLORIDA,ADOPTING THE TENTATIVE CAPITAL IMPROVEMENT PLAN FOR FISCAL YEARS (FY) 2020 - 2024 AND ADOPTING THE CITY OF MIAMI BEACH TENTATIVE CAPITAL BUDGET FOR FY 2020, SUBJECT TO A SECOND PUBLIC HEARING SCHEDULED ON WEDNESDAY, SEPTEMBER 25, 2019 AT 5:03 P.M. This Resolution is being heard pursuant to Sections 166.041 and 200.065 ES. inquiries may be directed to the Budget and Performance Improvement Office at 305.673.7510. INTERESTED PARTIES are invited to appear at this meeting,or be represented by an agent,or to express their views in writing addressed to the City Commission. c/o the City Clerk, 1700 Convention Center Drive, 1" Floor, City Hall, Miami Beach, Florida 33139. Copies of these items are available for public inspection during normal business hours in the Office of the City Clerk, 1700 Convention Center Drive, 1"Floor,City Hall,Miami Beach, Florida 33139.This meeting, or any item herein,may be continued,and under such circumstances,additional legal notice need not be provided. Pursuant to Section 286.0105, Fla. Stat., the City hereby advises the public that if a person decides to appeal any decision made by the City Commission with respect to any matter considered at its meeting or its hearing,such person must ensure that a verbatim record of the proceedings is made,which record includes the testimony and evidence upon which the appeal is to be based.This notice does not constitute consent by the City for the introduction or admission of otherwise inadmissible or irrelevant evidence,nor does it authorize challenges or appeals not otherwise allowed by law. To request this material in alternate format,sign language interpreter(five-day notice required),information on access for persons with disabilities,and/or any accommodation to review any document or participate in any City-sponsored proceedings,call 305.604.2489 and select 1 for English or 2 for Spanish,then option 6,TTY users may call via 711 (Florida Relay Service). Rafael E.Granado,City Clerk City of Miami Beach Ad 091119-05 'age • o