Resolution 2019-30999 RESOLUTION NO. 2019-30999 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO. 2 TO THE CONSTRUCTION CONTRACT IQC WORK ORDER.NO. 061034.02 BETWEEN THE CITY OF MIAMI BEACH, FLORIDA, AND TEAM CONTRACTING, INC., FOR THE ADDITIONAL STRUCTURAL SPALLING REPAIRS, REMOVAL OF CORROSIVE METAL MEMBERS, AND SEALING OF THE NORTHERN MOST DOCKS, FOR THE PURPOSE OF COMPLETING THE MAURICE GIBB MEMORIAL PARK CONCRETE DOCKS "PURDY BOAT RAMPS" REPAIRS, IN AN AMOUNT NOT TO EXCEED OF $10,214.29, WITH PREVIOUSLY APPROPRIATED FUNDS IN THE CURRENT FISCAL YEAR BUDGET. WHEREAS, Job Order Contracting (JOC) is a contracting methodology that enables facility owners to expedite and accomplish a large number of repairs, maintenance and construction projects with a single, competitively'bid contract with pre-established pricing for most • construction activities; and WHEREAS, prior to October 2012, the City acquired construction services for most small or emergency construction projects through a Job Order Contracting process; however, since the Fall of 2012, the City had not utilized the JOC methodology and had no similar system in place for expediting construction and maintenance projects, which significantly impacts the City's ability to complete work in a timely manner; and WHEREAS, the Finance and Citywide Projects Committee (the Committee), on February 21, 2014, endorsed a recommendation by the Administration, as a pilot to reintroduce this efficient process of project delivery to the City, to begin utilizing the Gordian Group's indefinite quantity contract (IQC), alternatively known as JOC, for construction services to expedite the delivery of construction or maintenance projects under$250,000, or for emergency projects, as approved by the City Manager; and WHEREAS, Sourcewell, formally known as National Joint Powers Alliance (NJPA), a national cooperative that bids contracts aggregating the spend volume of agencies across the country, awarded Contract No. 071415-GGI for IQC construction services, and said contract includes an award to Team Contracting, through the Gordian Group's IQC process, to provide services to the City pursuant to the contract; and WHEREAS, on January 15, 2014, via Resolution No. 2014-28462, the City Commission authorized the Administration to utilize cooperative awards, pursuant to Section 2-369 of the Miami Beach City Code; and WHEREAS, due to the need to expedite the project for the structural repairs for the Purdy Boat Ramp Docks(the"Project"), the Project was selected as an appropriate Project for acquiring the construction services through the IQC; and WHEREAS, the Property Management Department identified Team Contracting Inc., a contractor awarded to the Sourcewell IQC Contract No. FLO4UG3-051716-TCI, as the most qualified and experienced contractor to complete the required scope in a timely manner; and WHEREAS, on October 12, 2018, after negotiations, the Contractor submitted the original bid proposal, utilizing the IQC Catalog in the amount of$357,932.43 for the structural repairs as per the plans under IQC work order No. 061034.02; and WHEREAS, due to unforeseen conditions experienced on the Project, the City and the engineer of record, BCC Engineering, have identified additional work that needs to be performed that was not depicted in the construction documents, including additional structural spalling repairs, removal of corrosive metal framing members, and properly sealing of the concrete slabs in the northern most docks; WHEREAS, on August 23, 2019, after negotiations, the Contractor submitted a change order proposal in the amount of$10,214.29 for the additional work; and WHEREAS, the Administration recommends approval of the change order proposal, as the proposal has been reviewed by staff, the engineer of record, and the Gordian Group, and determined to be reasonable and fair. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby approve and authorize the City Manager to execute Change Order No. 2 to the construction contract IQC work order No.061034.02 between the City and Team Contracting, Inc.,for the additional structural spalling repairs, removal of corrosive metal members,and sealing of the northern most docks, for the purpose of completing the Maurice Gibb Memorial Park Concrete Docks "Purdy Boat Ramps" repairs, in an amount not to exceed of $10,214.29, with previously appropriated funds in the current fiscal year budget. PASSED and ADOPTED this 2S day of ,S'P,.f-ekn6Qa' , 2019. ,400„---• -ig." DAN GELBER, MAYOR ATTEST: 1 thl 4 RA AEL E. RANADO, iTY CLERK ��, ;4 APPROVED AS TO tG H FORM &LANGUAGE &FOR EXECUTION aLw ..*0) ...* if ,,V•-.. ,,./ , c, _„ _,, ,,,, , A.�� : , .. City Attorney am D to0 .,- CoQ R/ "ahk 'i'P�c. Resolutions - C7 B MIAMI BEACH COMMISSION MEMORANDUM TO: Honorable Mayor and Members of the City Commission FROM: Jimmy L. Morales, City Manager DATE: September 25, 2019 SUBJECT:A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO. 2 TO THE CONSTRUCTION CONTRACT IQC WORK ORDER NO. 061034.02 BETWEEN THE CITY OF MIAMI BEACH, FLORIDA, AND TEAM CONTRACTING, INC., FOR THE ADDITIONAL STRUCTURAL SPALLING REPAIRS, REMOVAL OF CORROSIVE METAL MEMBERS, AND SEALING OF THE NORTHERN MOST DOCKS, FOR THE PURPOSE OF COMPLETING THE MAURICE GIBB MEMORIAL PARK CONCRETE DOCKS "PURDY BOAT RAMPS" REPAIRS, IN AN AMOUNT NOT TO EXCEED OF $10,214.29, WITH PREVIOUSLY APPROPRIATED FUNDS IN THE CURRENT FISCAL YEAR BUDGET. RECOMMENDATION The Administration recommends approval of the Resolution. BACKGROUND/HISTORY ANALYSIS On September 26, 2018, the Mayor and City Commision adopted Resolution 2018-30515 adopting the Final Capital Improvement Plan for Fiscal Years (FY) 2018/19 - 2022/23 and The City of Miami Beach Final Capital Budget for FY 2018/19 was approved allocating funding for the repairs to Purdy Avenue Boat Ramps. On August 28, 2018, BCC Engineering was engaged to provide structural construction documents for the repair and replacement of the existing Purdy Boat Ramp Docks. On September 14, 2018 construction drawing were submitted for permit review and approval (the "Project"). In the interest of time, the City chose to expedite the Project and utilize the IQC process. Through the IQC process, Team Contracting, Inc. (the "Contractor") was identified as the most qualified and experienced contractor to complete the identified scope per BCC Engineering's report and construction documents. Page 74 of 540 On October 12, 2018, the City and the Gordian Group met with the Contractor to review the scope for the Project. After negotiations, the contractor submitted a bid proposal in the amount of $357,932.43 for the Project. An additional 5% ($17,897.00) owner's contingency was requested for any unforeseen circumstances. The scope of work included dock pile repairs, concrete dock slab repairs, and wood pile repairs as depicted in the approved construction documents. On August 23, 2019, additional corrective actions were identified by the Contractor on site exceeding the scope and estimated square footage of concrete repairs. On August 27, 2019 the Contractor submitted change order No. 2 in the amount of$10,214.29. This scope includes additional structural spelling repairs, removal of corrosive metal framing members, and properly sealing of the concrete slabs in the northern most docks. These unforeseen conditions were not depicted in the approved construction documents. FINANCIAL INFORMATION Previously appropriated as part of the Capital Renewal and Replacement budget of fiscal year 2019. CONCLUSION The Administration recommends approval of the Resolution. Applicable Area Middle Beach Is this a Resident Right to Does this item utilize G.O. Know item? Bond Funds? No No Legislative Tracking Property Management ATTACHMENTS: Description ❑ Change Order 2 o Resolution Page 75 of 540 1-2 I C THE GORDIAN GROUP Work Order Signature Document. NJPA EZIQC Contract No.: FLO4UG3-051716-TCI New Work Order X Modify an Existing Work Order Work Order Number.: 061034.02 Work Order Date: 08/27/2019 Work Order Title: Miami Beach Marine Patrol.Docks Supplemental No.2 Owner Name: City of Miami Beach Contractor Name: Team Contracting, Inc: Contact: Adrian Morales Contact: Daniel Gell Phone: 305-673-7000 Phone: `305 207.9799 Work to be Performed Work to be performed as per the Final Detailed Scope of Work Attached and as per the terms and conditions of NJPA EZIQC Contract No FLO4UG3-051716-TCI. Brief Work Order Description: Scope of work includes repairing the voids underneath slabs 5&10. Time of Performance Estimated Start Date: Estimated Completion Date: Liquidated Damages Will apply: Will not apply: 5C1. Work Order Firm.Fixed Price:$10,214.29 Owner Purchase Order Number: Approvals 'covvt)//3,0 (211 11. Owner Date, Contractor Date. City Manager Date Work Order Signature Document Page-1 of 1 8/27/2019 Page 76 of 540 tal IQ C THE GORDIAN GROUP Detailed Scope of Work To: Daniel Gell From: Adrian Morales Team Contracting, Inc. - City of Miami Beach 13911 SW 42nd St.Suite 209 _ 1700 Convention Center Drive Miami, FL 33175 Miami Beach, FL 33139 305 207.9799 305-673-7000 Date Printed: August 27,2019 Work Order Number: 061034.02 Work Order Title: Miami Beach Marine Patrol Docks•Supplemental No.2 Brief Scope: Scope ofwork'includes repairing the:voids underneath slabs 5&10. Preliminary Revised X Final The following items detail the scope of work as discussed at the site.All requirementsnecessary to accomplish the items set forth below shall be considered part of this scope of work. Scope of work includes additional repairs requested by the owner such as repairing the voids underneath slabs 5&10. Subj o the erms and conditions of JOC Contract FLO4UG3-051716-TCI. % 6gfp27 Contractor Date Owner Date City Manager Date. Scope of Work Pagel of 1 8/27/2019 Page 77 of 540 Contracto's Price Proposal - Summary Date: August 27,2019 Re: IQC Master Contract#: FL04UG3-051716-TCI Work Order#: 061034.02 Owner PO#: Title: Miami Beach Marine Patrol Docks Supplemental,No.2 Contractor Team Contracting,Inc. Proposal Value: $10,214.29 Fill Voids $10,214.29 Proposal Total $10,214.29. This!total represents the correct total for the proposal. Any discrepancy between like totals, sub-totals and the proposal total is due to rounding. The Percentage of NPP on this Proposal: Contractor's Price Proposal-summary Page 1 of 1 8/27/2019 Page 78 of 540 Contractor's Price Proposal - Detail Date: August 27,2019 Re: IQC Master Contract#: FL04UG3-051716-TC1 Work Order#: 061034.02 Owner PO#: Title: Miami Beach Marine Patrol Docks Supplemental No.2 Contractor: Team Contracting,Inc. , Proposal Value: $10,214.29 Sect. Item 'Mod. UOM Description Line Total Labor Equip. Material (Excludes) Fill Voids 1 01 22 20 00 0015 HR LaborerFor tasks not included in the Construction Task Catalog®and as $1,446.63 directed by:owner only. Quantity Unit Price Factor Total Installationx 26.19 x 1.3809 1,446.63 40.00 Rip Rap Removal 2 0.1 22 23 001001 DAY 5,200 GPH,3"Discharge,25'Maximum Head,Gas Powered Portable $517.89 Diaphragm Pump Quantity Unit Price Factor Total Installationx. 93.76 x 1.3809: - 517.89 4.00 3 01 74 19 000036 CYM Hauling On Paved Roads,Miles Over Initial 15 Miles $64.63 Quantity Unit Price Factor Total Installation120.00 x 0.39 x 1.3809• - 64.63 ' 4 01 74 19 00.0036 CYM Hauling On Paved,Roads;Miles Over Initial 15 Miles $64.63 Quantity Unit Price Factor Total Installationx 0.39 x 1.3809 = 64.63 120.00 5 03 31 13 000104• HR 35 CY/HR,66 HP Trailer Mounted Concrete Pumpincludes hoses $1,795.17 Quantity Unit Price Factor Total Installation16.00 x 81.25 x 1.3809 = 1,795.17 6 06 82 00 '00`00.35 SF 1/8"Thick Fiberglass Flat Sheet,VERF Vinyl Ester Resin $2,170.77 Quantity Unit Price Factor Total Install"anon100.00 x 15.72 x 1.3809 = 2,170.77 7 31 23 23 330002. CY Flowable,Cement Backfill for Trenches $2,153.93 Quantity Unit Price Factor Total Installation x 77:99 x 1.3809 2,153.93 20.00 8 31 23 23 330002 0074 MOD For Up To 20,Add $799.82 Quantity Unit Price Factor Total Installationx 28.96 x 1.3809 799.82 20.00 9 31 37 00 00 0003 CY >50 To 100 LB Average Pieces Random,Dumped From Truck,Rip Rap $1,200.83 Quantity Unit Price Factor Total Inst^!ie+ion - 1,200.83 10.00 x' 86.96 x 1.a&09 Subtotal for Fill Voids $10,214.29 Proposal Total $10,214.29 This total represents the correct total for the,proposal. Any discrepancy between line totals, sub-totals and the proposal total is due to rounding. The Percentage of NPP on this Proposal: Contractor's Price Proposal-Detail Page 1 of 1 8/27/2019 Page 79 of 540 Subcontractor Listing THE GORDIAN GROUP Date: August 27,2019 Re: IQC Master Contract#: FLO4UG3-051716-TCI Work Order#: 061034.02 Owner PO#: Title: Miami Beach Marine Patrol Docks Supplemental No.2 Contractor: Team Contracting,Inc. Proposal Value: $10,214.29 Name of Contractor Duties Amount % No Subcontractors have been $0.00 0.00 selected for this Work Order Subcontractor Listing Page 1'of 1 9/27/2019 Page 80 of 540