R9 D FDOT PRESENTATION ON 395 836City of Miami Beach Commission Update October 16, 2019 * This schedule does not reflect days added to the contract for holidays, weather days or special events 2 •Construction of new drainage, median concrete barrier wall and pavement replacement on I-95 between NW 17 Street and NW 29 Street (Ongoing) •Erection of new sign structures along I-95. This work will require nighttime full closures of I-95 between NW 17 Street and NW 29 Street (Northbound closures scheduled for October 15,16 and 17) UPCOMING & ONGOING CONSTRUCTION ACTIVITIES * This schedule does not reflect days added to the contract for holidays, weather days or special events 3 UPCOMING & ONGOING CONSTRUCTION ACTIVITIES * This schedule does not reflect days added to the contract for holidays, weather days or special events 4 Foundation work on northbound I-95 bridge approaching ramp to I-195 (Ongoing) UPCOMING & ONGOING CONSTRUCTION ACTIVITIES 5 Ongoing work on eastbound SR 836 from NW 17 Avenue to the Miami River and from NW 12 Avenue to I-95 for bridge widening. UPCOMING & ONGOING CONSTRUCTION ACTIVITIES 6 UPCOMING & ONGOING CONSTRUCTION ACTIVITIES SR 836 UPCOMING CONSTRUCTION ACTIVITIES 7 ANTICIPATED NIGHTTIME LANE CLOSURES ON SR 836 CORRIDOR: •Lane closures along eastbound and westbound SR 836 •NW 17 Avenue under SR 836 •Eastbound SR 836 ramp to NW 17 Avenue •Eastbound SR 836 ramp to northbound I-95 •Arterial Roads under SR 836 ONGOING LANE CLOSURES THREE MONTH LOOK AHEAD 8 •Implemented a traffic shift on westbound I-395 from NE 1 Avenue to I-95. Traffic has been shifted to the left •Ongoing demolition of outside I-395 on-ramp that was closed as part of the NE 12 Street Closure 1 2 UPCOMING & ONGOING CONSTRUCTION ACTIVITIES 1 2 * This schedule does not reflect days added to the contract for holidays, weather days or special events 9 UPCOMING & ONGOING CONSTRUCTION ACTIVITIES SR 836 UPCOMING CONSTRUCTION ACTIVITIES 10 1.Demolition of median separator between the eastbound I-395 mainline and local road connector (Ongoing) Concrete closure pour between the eastbound I-395 mainline and local road connector (Ongoing) 2.Removal of median separator between the eastbound I-395 mainline and the westbound mainline (November) 3.Begin construction on westbound outside, local road lanes. Foundations will begin at NE 2 Avenue and move towards the west (October/November) 4.Begin construction on eastbound, local road lanes. Foundations will begin at NW 1 Avenue and move towards the west (November) I-395 BRIDGE WORKUPCOMING & ONGOING CONSTRUCTION ACTIVITIES 3 2 1 4 * This schedule does not reflect days added to the contract for holidays, weather days or special events 11 UPCOMING & ONGOING CONSTRUCTION ACTIVITIES * This schedule does not reflect days added to the contract for holidays, weather days or special events 12 UPCOMING & ONGOING CONSTRUCTION ACTIVITIES Auger Cast Pile Load Testing Scheduled -Ongoing * This schedule does not reflect days added to the contract for holidays, weather days or special events 13 UPCOMING & ONGOING CONSTRUCTION ACTIVITIES SR 836 UPCOMING CONSTRUCTION ACTIVITIES 14 Bridge foundation work for westbound Signature Bridge (December) UPCOMING CONSTRUCTION ACTIVITIES THREE MONTH LOOK AHEAD SR 836 UPCOMING CONSTRUCTION ACTIVITIES 15 ANTICIPATED NIGHTTIME LANE CLOSURES ON I-395 CORRIDOR: •Southbound I-95 and northbound I-95 ramps to eastbound I-395 •Lane closures along I-395 mainline and connector road •Lane closures along Biscayne Boulevard •Arterial roads under I-395 •Shift traffic on eastbound I-395 mainline to the right from I-95 to approximately NW 1 Avenue to allow for the removal of the eastbound and westbound traffic separator (late October) ONGOING LANE CLOSURES THREE MONTH LOOK AHEAD •Provide drivers with real-time travel information; •Encourage motorists to take alternate routes; •Clear incidents more quickly, thereby reducing secondary incidents; and •Make work zones safer for highway workers and motorists. Smart Work Zone Management System (SWZMS) -The project is implementing a SWZMS that will utilize Intelligent Transportation System (ITS) devices such as traffic cameras, data collection devices and portable message signs to: TRAFFIC MANAGEMENT SYSTEM 16 N MAINTENANCE OF TRAFFIC (MOT)/HOURS I-395 SPECIFIC Mainline Nightly Closures • 10 pm to 5:30 am Sunday thru Thursday • 1 am to 7 am Saturday and Sunday SR 836 SPECIFIC Mainline Nightly Closures • 8 pm to 5:30 am Sunday thru Thursday • 8:30 pm to 9 am Friday • 8:30 pm to 11 am Saturday I-95 SPECIFIC Mainline Nightly Closures • 9 pm to 5:30 am Sunday thru Thursday RAMPS • 10 pm to 6:30 am Sunday thru Thursday​ • 11 pm to 7 am Friday and Saturday​ SPECIAL NOTES: •Special events will be taken into account when scheduling closures •Hours noted above are for single lane closures, multi-lane closures will occur later •Weekend lane closures will be permitted on I-95 from 11 p.m. on Friday to 5:30 a.m. on Monday •The contract documents allow for weekend closures on certain ramps 17 786-280-0983 OGonzalez@mrgmiami.com Contact: Oscar Gonzalez www.i-395miami.com THANK YOU! 18