R9 D FDOT PRESENTATION ON 395 836City of Miami Beach Commission Update
October 16, 2019
* This schedule does not reflect days added to the contract for
holidays, weather days or special events
2
•Construction of new drainage, median concrete barrier wall and pavement replacement on I-95 between
NW 17 Street and NW 29 Street (Ongoing)
•Erection of new sign structures along I-95. This work will require nighttime full closures of I-95
between NW 17 Street and NW 29 Street (Northbound closures scheduled for October 15,16 and
17)
UPCOMING & ONGOING
CONSTRUCTION ACTIVITIES
* This schedule does not reflect days added to the contract for
holidays, weather days or special events
3
UPCOMING & ONGOING
CONSTRUCTION ACTIVITIES
* This schedule does not reflect days added to the contract for
holidays, weather days or special events
4
Foundation work on northbound I-95 bridge approaching ramp to I-195 (Ongoing)
UPCOMING & ONGOING
CONSTRUCTION ACTIVITIES
5
Ongoing work on eastbound SR 836 from NW 17 Avenue to the Miami River and from NW 12
Avenue to I-95 for bridge widening.
UPCOMING & ONGOING
CONSTRUCTION ACTIVITIES
6
UPCOMING & ONGOING
CONSTRUCTION ACTIVITIES
SR 836 UPCOMING CONSTRUCTION ACTIVITIES
7
ANTICIPATED NIGHTTIME LANE CLOSURES ON SR 836 CORRIDOR:
•Lane closures along eastbound and westbound SR 836
•NW 17 Avenue under SR 836
•Eastbound SR 836 ramp to NW 17 Avenue
•Eastbound SR 836 ramp to northbound I-95
•Arterial Roads under SR 836
ONGOING LANE
CLOSURES
THREE MONTH LOOK
AHEAD
8
•Implemented a traffic shift
on westbound I-395 from
NE 1 Avenue to I-95.
Traffic has been shifted to
the left
•Ongoing demolition of
outside I-395 on-ramp that
was closed as part of the
NE 12 Street Closure
1
2
UPCOMING & ONGOING
CONSTRUCTION ACTIVITIES
1
2
* This schedule does not reflect days added to the contract for
holidays, weather days or special events
9
UPCOMING & ONGOING
CONSTRUCTION ACTIVITIES
SR 836 UPCOMING CONSTRUCTION ACTIVITIES
10
1.Demolition of median separator between the
eastbound I-395 mainline and local road
connector (Ongoing)
Concrete closure pour between the
eastbound I-395 mainline and local road
connector (Ongoing)
2.Removal of median separator between the
eastbound I-395 mainline and the westbound
mainline (November)
3.Begin construction on westbound outside,
local road lanes. Foundations will begin at
NE 2 Avenue and move towards the west
(October/November)
4.Begin construction on eastbound, local road
lanes. Foundations will begin at NW 1
Avenue and move towards the west
(November)
I-395 BRIDGE WORKUPCOMING & ONGOING
CONSTRUCTION ACTIVITIES
3
2
1
4
* This schedule does not reflect days added to the contract for
holidays, weather days or special events
11
UPCOMING & ONGOING
CONSTRUCTION ACTIVITIES
* This schedule does not reflect days added to the contract for
holidays, weather days or special events
12
UPCOMING & ONGOING
CONSTRUCTION ACTIVITIES
Auger Cast Pile Load Testing Scheduled -Ongoing
* This schedule does not reflect days added to the contract for
holidays, weather days or special events
13
UPCOMING & ONGOING
CONSTRUCTION ACTIVITIES
SR 836 UPCOMING CONSTRUCTION ACTIVITIES
14
Bridge foundation work for westbound Signature Bridge (December)
UPCOMING CONSTRUCTION
ACTIVITIES
THREE MONTH LOOK
AHEAD
SR 836 UPCOMING CONSTRUCTION ACTIVITIES
15
ANTICIPATED NIGHTTIME LANE CLOSURES ON I-395 CORRIDOR:
•Southbound I-95 and northbound I-95 ramps to eastbound I-395
•Lane closures along I-395 mainline and connector road
•Lane closures along Biscayne Boulevard
•Arterial roads under I-395
•Shift traffic on eastbound I-395 mainline to the right from I-95 to
approximately NW 1 Avenue to allow for the removal of the eastbound
and westbound traffic separator (late October)
ONGOING LANE
CLOSURES
THREE MONTH LOOK
AHEAD
•Provide drivers with real-time
travel information;
•Encourage motorists to take
alternate routes;
•Clear incidents more quickly,
thereby reducing secondary
incidents; and
•Make work zones safer for
highway workers and motorists.
Smart Work Zone Management
System (SWZMS) -The project is
implementing a SWZMS that will
utilize Intelligent Transportation
System (ITS) devices such as traffic
cameras, data collection devices
and portable message signs to:
TRAFFIC MANAGEMENT SYSTEM
16
N
MAINTENANCE OF TRAFFIC (MOT)/HOURS
I-395 SPECIFIC
Mainline Nightly Closures
• 10 pm to 5:30 am Sunday thru Thursday
• 1 am to 7 am Saturday and Sunday
SR 836 SPECIFIC
Mainline Nightly Closures
• 8 pm to 5:30 am Sunday thru Thursday
• 8:30 pm to 9 am Friday
• 8:30 pm to 11 am Saturday
I-95 SPECIFIC
Mainline Nightly Closures
• 9 pm to 5:30 am Sunday thru Thursday
RAMPS
• 10 pm to 6:30 am Sunday thru Thursday
• 11 pm to 7 am Friday and Saturday
SPECIAL NOTES:
•Special events will be taken into account when scheduling closures
•Hours noted above are for single lane closures, multi-lane closures will occur later
•Weekend lane closures will be permitted on I-95 from 11 p.m. on Friday to 5:30 a.m. on Monday
•The contract documents allow for weekend closures on certain ramps
17
786-280-0983
OGonzalez@mrgmiami.com
Contact:
Oscar Gonzalez
www.i-395miami.com
THANK YOU!
18