Resolution 2019-31022 RESOLUTION NO. 2019-31022
A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF
THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND
ACCEPTING THE FORMALIZED EXTERNAL
COMMUNICATIONS PLAN, WHICH WILL SERVE AS A
RESOURCE FOR CITY EMPLOYEES TO COMMUNICATE AND
ENGAGE WITH MIAMI BEACH RESIDENTS ON GOVERNMENT
RESILIENT INFRASTRUCTURE INITIATIVES.
WHEREAS, on July 25, 2018, the Mayor and City Commission referred a discussion item
to the Sustainability Resiliency Committee to discuss referring a task to the City Manager's
Resilient Enhancement Action Design For You ("READY") Team to create a standard capital
improvement project workflow (from planning, through design and construction) that illustrates
the public engagement opportunities in the process in order to both optimize public engagement
and facilitate timely completion of projects; and
WHEREAS, subsequently, the Office of Marketing and Communications created a
resilience education campaign which includes communications materials, community meetings,
direct mailings, and a formalized External Communications Plan (see Attachment); and
WHEREAS, the External Communications Plan creates standardized public outreach
procedures for all internal and external (contracted) Public Information Officers, including project
tollgates for optimized public engagement; and
WHEREAS, the City Administration recommends that the Mayor and City Commission
approve and authorize the formalized External Communications Plan, which will serve as a
resource for City employees to communicate and engage with the City's residents on
government resilient infrastructure initiatives.
NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY
COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City
Commission hereby approve and accept the formalized External Communications Plan which
will serve as a resource for City employees to communicate and engage with Miami Beach
residents on government resilient infrastructure initiatives.
PASSED and ADOPTED this 16th day of October 2019.
ATTEST:
zogeta
Dan Gelber, Mayor
7)4
Rafael E. Granado, City Clerk
,.; • APPROVED AS TO
n FORM & LANGUAGE
~ & FOR EXECUTION
iNCORP
uRATr- i�- �Tjp*. ;' 0
sere, •., City Attorney Date
k;126 };:
Resolutions -C7 M
MIAMI BEACH
COMMISSION MEMORANDUM
TO: Honorable Mayor and Members of the City Commission
FROM: Jimmy L. Morales, City Manager
DATE: October 16, 2019
SUBJECT:A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY
OF MIAMI BEACH, FLORIDA, APPROVING AND ACCEPTING THE
FORMALIZED EXTERNAL COMMUNICATIONS PLAN, WHICH WILL
SERVE AS A RESOURCE FOR CITY EMPLOYEES TO COMMUNICATE
AND ENGAGE WITH MIAMI BEACH RESIDENTS ON GOVERNMENT
RESILIENT INFRASTRUCTURE INITIATIVES.
RECOMMENDATION
Adopt the Resolution.
BACKGROUND/HISTORY
Various City departments currently have, or contract, Public Information Specialists (PIS) that are
dedicated to various specific projects throughout the City such as construction projects or studies.
The purpose of the PIS is to conduct door-to-door outreach, hold community meetings, send regular
email updates and act as the general point-person for these specific projects.
To date, there has not been one coordinated plan that every PIS would follow pertaining to
outreach. This has led to various levels of communication and documentation of the same for each
project. The External Communications Plan has been created to streamline communications with our
residents and ensure timely, thorough and consistent information of the same.
As part of the City of Miami Beach's resiliency building efforts, the City Manager's Office is working
to empower civic engagement practices. The Urban Land Institute (ULI) recommended that the City
adopts an integrated strategic communications and resident engagement plan that will keep
messages consistent, relationships trustworthy and residents knowledgeable throughout urban
innovation, revitalization and adaption projects.
ANALYSIS
Currently when the city begins a construction project or study, a department will either assign an
internal PIS or contract with an approved list of vendors to act as the external point-person for the
project. Each PIS would then follow their own standards or guidelines given by the particular
department that they were contracted by regarding how the outreach would be conducted or how
residents would be informed about the project.
Page 681 of 2557
In 2018, the Mayor and Commission approved $250,000 to utilize for the purpose of communicating
and educating residents and visitors on the resilience efforts of the City. Throughout the year many
tools were created including a multi-tiered marketing campaign, a special edition of MB Magazine, a
custom map of resilience locations throughout Miami Beach direct mailed to all residents, two
community meetings regarding resilience efforts—with four more planned for this upcoming year, paid
promotions of all meeting notices geo-targeting Miami Beach residents and the attached External
Communications Plan.
The External Communications Plan was created to serve as a resource for City employees to
communicate and engage with Miami Beach residents on government resilient infrastructure
initiatives. Additionally, the Plan attaches the existing "Rising Above" brand to all resilient building
projects that are led by Public Works, Transportation and Capital Improvement Departments.
FINANCIAL INFORMATION
Infinite Source Communications was contracted to with with city staff as well as external PI Os to
complete the External Communications Plan.
Account(s) 011-0350- Amount(s) $12,750
000343-11-
400-592-00-
00-00-
CONCLUSION
The External Communications Plan aims to enhance resident communications and engagement
activity performance by increasing message consistency, trusting relationships and knowledge-
sharing between local government and public sectors. It is meant to exist as a living document
and discussed among City Management team members. It should be modified as needed and
distributed, to all project consultants and assigned staff, with the Office of the City Manager
having full discretion of product delivery and function.
Anyone that communicates with residents of Miami Beach on behalf of the City, specifically on
infrastructure projects led by Public Works, Transportation and Capital Improvement Projects
should follow the guidelines of this external communications plan.
Applicable Area
Citywide
Is this a Resident Right to Does this item utilize G.O.
Know item? Bond Funds?
No No
Strategic Connection
Organizational Innovation- Improve two-way communications and engagement.
Legislative Tracking
Page 682 of 2557
Marketing and Communications
Sponsor
Commissioner John Elizabeth Aleman
ATTACHMENTS:
Description
D Resolutions
❑ Attachment
Page 683 of 2557
-_
..
. . .
Alibi/'
. milm.11 I
_.
. ,
•
,41
AlVil / ,
A # A
r .
. r .
A
AwrivAp
....-.._.
....-.:.---
. , ... 1
V --
, --„,-
''-'0'r
..:k.V.
..t.,2,gTr...r
, --1.3,.
' i
•,
4 .
;II
.... z
'fi;-:14,52s.
:”:-'1::'-''..-.:
:-.r.," <4F* /
/. ..:-.....':- i lt,
• .;Vciit
• .. -• . /
• ' . \1
... ..
i i
--..
I
/
--..,i.AL• :-
• ,., e
/1
: . •••,3%,Ne`
/: \
., ..:,.,.. • / -
, •
• & _.,_,
. ,
• ;-A:-.. .- /
..„............ ...
, • ,.,. [
i.
-.-,- - •
, . , •.. ..1--
. . .„
• . 1-:::,.:-: r ,Y '
I4: f. 1
: 7 t-'''• ,..„7. -,_,-
- _---_
..,IPT, -• • 1
AC••• ..A
,---,,,,, J ' 11#1
4• .=.._.,
•
... g , •J J.,
. ...1..;;;'j.77'.-:.•';','.
.
BEACH'
p ,...... : .., -..:, ......
;.-,,,,:i ,
RISING
A B 0 V voirE 14-74-4'''
7.i..P.7
:.4 ,..
•
,I
. t
1 ,iA
RlSl \ G
ABOVE
TABLE OF CONTENTS
• Intro to the R.I.S.E. Guide 3
• Initial Project Coordination Process 4
• Communication Levels and Outreach Methods 6
• Public Meeting Coordination 7
• Collateral Development, Templates & Style 8
• Wording & Messaging 9
• Correspondence 10
• Project Reporting 10
• Customer Satisfaction Survey 10
• Contact Information 11
• Understanding Resilience 11
o Definition
o FAQs
o Glossary of Terms
o Key Talking Points
o References and Resources
o Statistics and Facts
• Appendix (Templates) 23
o Advisories and Notices
o Community Impact Questionnaire
o Customer Survey
o Door Hanger
o Letter Head
o Logo & Specifications
o Monthly Report
o Neighborhood Profile
o PowerPoint Slide
o Project Charter
o Project R.I.S.E Plan
2
Page 687 of 2557
I
RISING
A3OVE
Introduction to the R.I.S.E Guide
The R.I.S.E. Guide was created to serve as a resource for city employees to communicate and engage with
Miami Beach residents on government resilient infrastructure initiatives. It is an integrated internal
communications guide with models and frameworks derived from the field of Community Psychology. The Guide
attaches the existing Rising Above brand to all resilient building projects that are led by the Public Works,
Transportation and Capital Improvements Departments.
The R.I.S.E. Guide aims to enhance resident communications and engagement activity performance by
increasing message consistency, relationship trust and knowledge-sharing between local government and the
public.
The Guide is meant to exist as a living document and discussed among city Management team members. It
should be modified as needed and distributed to all project consultants and assigned staff with the Office of the
City Manager having full discretion of product delivery and function.
Why the R.I.S.E. Guide?
As part of the City of Miami Beach's resilience building efforts, the City Manager's Office is working to empower
civic engagement practices. The Urban Land Institute (ULI) recommends that the city adopts an integrated
strategic communications and resident engagement plan that will keep messaging consistent, relationships
trustworthy and residents knowledgeable throughout urban innovation, revitalization and adaptation projects.
Who should use it?
Anyone that communicates with residents of Miami Beach on behalf of the city. Specifically, such communication
would include infrastructure projects led by Public Works, Transportation and Capital Improvements Projects.
The contents are especially relevant to City of Miami Beach employees with duties in public information,
community outreach, citizen engagement and education; media relations, stakeholder management and partner
involvement; content production, content marketing and other creative services; internal communication,
knowledge management, meeting facilitation, and both professional and resource development.
3
Page 688 of 2557
� IS1 \. v
A3OVE
Initial Project Coordination Process
For each project, the assigned City project Liaison along with his/her assigned Public Information Officer (PIO)
should complete a series of steps prior to any development of materials and/or communication with the general
public. Below is a three-step process for project coordination from inception to completion.
Project Coordination Process
Step Task I Responsible Party
Project Charter, Neighborhood CMB Project Liaison and supporting
Step One Profile, Community Impact staff
Questionnaire
CMP Project Liaison, PIO,
Step Two Project Kickoff Meeting Contractor and Project Engineer,
Supporting CMB Staff
Step Three Project R.I.S.E Plan Assigned PIO
Step Four Project Completion Summary Assigned PIO
Step Five Letter to Commission (LTC) City Liaison
Step 1 - Project Charter, Neighborhood Profile and Community Impact Questionnaire
Development of the project charter, neighborhood profile and community impact questionnaire need to be
facilitated by the CMB Project Liaison and provided to the assigned PIO. Once these documents are completed,
the Project Liaison will send a calendar invite requesting a kick-off meeting with the internal team and
Communications Department. All necessary departments need to be included in this meeting. Refer to page 23
for this template.
Once this project charter is completed an email notice and calendar meeting request to the internal team and
communications department needs to be set up. All necessary City Departments need to be included in this
meeting,
Step 2 - Project Kickoff Meeting
CMB Project Liaison to conduct a Kick-off meeting to discuss the following items:
A. Review project charter (Project Charter, Neighborhood Profile and Questionnaire)
I. Work to fill any missing information
II. Gather more information for the questionnaire and modify responses accordingly
B. Discuss and confirm project communications
I. Messaging - Key points and project facts
II. Methods - Communication tools used to promote the project, meetings, and overall project
engagement (ex., door-to-door, social media, e-blasts, one-on-one meetings, mailers, special
4
Page 689 of 2557
RISING
A3OVE
events, etc.)
III. Materials — What materials will be developed? (ex., fact sheet, door hanger, advisory, comment
cards, etc.
IV. Meetings — Discuss progress meeting schedules and the need for public meetings.
C. Generate Neighborhood R.I.S.E Team
I. ID a key representative of the project corridor or Neighborhood Association
D. Discussion of Next Steps
I. Development of Project R.I.S.E Plan
II. Website project page development
III. Collateral Development
IV. Project start dates
V. Public Meeting dates and locations
VI. Other items
Step 3 — Preparation of Project R.I.S.E. Plan (PRP)
After the kick-off meeting is conducted, the assigned PIO will use the project charter and information from the
meeting to develop the Project R.I.S.E Plan.
A R.I.S.E Plan must be developed for each project prior to construction commencing. A PRP is an effective way to
include the information received from the project charter and approved outreach strategies based on the type of
project, communication level and potential community concerns. The plan outlines a decided-on communications
plans and defines roles, project scope, timelines, deliverables and affected stakeholders. It also details the
informational outreach materials that are to be developed as part of the project. The PRP will serve as a living
document that is continuously reviewed and revised by the CMB Project Liaison and the PIO throughout the life of
the project.
Plan objectives include but are not limited to:
• Understanding the project scope, construction activities, Maintenance of Traffic (MOT) and other items
related to the project
• Understanding the dynamics of the project area, community, aesthetics, and other key items
• Identifying directly affected stakeholders and impacts
• Stating the overall outreach approach and deliverables to be generated
• Addressing any special accommodations, events or needs in an effort to mitigate impacts to the
community
Submit the PRP to the project team for review and approval. Finalize all outreach materials, follow approval
processes and disseminate this information to the public. Report findings using the monthly project report, revisit
the process and review needed changes. Refer to page 23 for this template.
Once the meeting has been conducted, the project charter and supporting documents should be updated with all
discussion items, signed by the project team and submitted to the project team, directors and Communications
Department. Refer to page 23 for this template.
5
Page 690 of 2557
R1S \ G
ABOVE
Communication Levels and Outreach Methods
Communication Levels:
Levels of communication have been established to guide the project team to determine the degree of outreach
methods required on a project. Outreach methods are subject to the discretion of the project team and
Communications Department. Once a level and methods have been established, the below information must be
added to the PRP.
• Level 1: Project is not contentious and causes minor impacts to access or traffic.
o Ex: Installing a traffic signals, midblock crossings, and installing lighting at intersections.
• Level 2: Project has general public approval, minor impact on access, and a moderate degree
disruption to motorists.
o Ex: Milling and resurfacing, some bridge repair projects, construction that may require some lane
closures.
• Level 3: Project is, or expected to be, contentious. The construction will pose significant impacts to
access that could be temporary or permanent and work requires significant impacts to motorists.
o Ex: Neighborhood utility improvement projects, major roadway reconstruction, parking removal,
installation of new roadway medians, traffic patterns or shared use paths, installation of speed
tables or other traffic calming devices, traffic signal removal, roadway widening or elevation,
harmonization, encroachment or landscaping removals, bridge repair projects on major
corridors, and projects including detours.
Outreach Methods
Below is a list of outreach methods to be considered when developing the PRP. Various outreach methods are
marked as a requirement (*) on all PRPs. Should the project team or PIO require additional outreach beyond this
list, written approval from the Communications Department must be obtained prior to implementing outreach.
• CMB Outreach Resources
o City Clerk's Office - Meeting Notices
c City Mobile Apps
• CityGrader
• MB Resident Connect
• Residents Portal
• Resident's Guide
o Citywide E-blast/E-newsletter.
o CMB Text- MBTraffic or MBAlert to 888777 to receive emergency notifications
o Commission Meeting Agendas (CMB Request Only)
o MB Magazine
o MBTV- Channel 77
o Social Media (Facebook, Instagram, Twitter, NextDoor and YouTube)
• Door-to-door distribution of project information along the project limits
6
Page 691 of 2557
SNG
A3OVE
o Consider using iPads or tablets to obtain project information electronically
• E-Blast via Constant Contact
• Elected Official/ Briefings via letter to commission (LTC)
• Groundbreaking/Ribbon Cutting Ceremonies/Other special events
• One-on-one meetings and presentations with directly affected stakeholders and community groups
• Online Streaming via Facebook Live, YouTube TV, etc.
o The PIO must work with the Communications Department. Audio and lighting need to be tested
and approved.
• Pop-up outdoor events
• Public Meetings/Charrettes (For more information see Public Meeting Coordination below)
• Website project page development and regular updates*
• Weekly Updates/Advisories/Status Updates*
Public Meeting Coordination
• All public meetings must adhere to the following outreach methods no less than two weeks prior to a
public meeting:
o Place on CMB calendar - email the clerk's office for with meeting information three weeks prior to
meeting.
o E-blast information to elected officials via CMB Project Manager — Provide information to pm.
o Make phone calls to main Homeowners Associations (HOA) and stakeholders to distribute the
flyer to their network.
o Door-to-door distribution of project information within the project limits.
o E-blast to all affected residents, HOA's and staff.
o Social media messaging — Send flyer in high resolution JPG format to the Communications
Department to share.
o Internal CMB Staff distribution — Send flyer to Chief of Staff.
o CMB Calendar posting — Send flyer to Communications Department.
• All meetings must commence with the showing of the Rising Above Video — Contact the Communications
Department to obtain a copy of this video.
• The following handouts must be provided at all meetings:
o FAQ and/or Fact Sheet
o Comment Card
o Meeting Agenda
• Meeting records must be posted on the website within one month after the meeting. The report should
include:
o Comment cards
o Full voice recording of the meeting
o Meeting sign-in sheets
o Meeting summary & photographs
7
Page 692 of 2557
A3OVE
Collateral Development, Templates and Style
• Approval process
o All collaterals must be approved by the CMB Project Liaison, and sent by the CMB Project Liaison
to the Communications Department Director and Assistant Director for approval prior to
disseminating to the public.
o It is the responsibility of the CMB project Liaison to obtain written approval from the contractor
and/or engineer prior to sending to the Communications Department.
o Any project funded by the General Obligation (G.0) Bond must use the G.O. Bond collaterals
templates. Templates are to be requested through the Communications Department.
• Database Development
o Upon project inception the PIO should develop a database of city officials and project team,
stakeholders, special interest groups, and property owners/current occupants to be used as a
communication tool throughout the life of the project. The database should be updated on a
monthly basis or as needed.
o This database is to be sent monthly to the Communications Department in spreadsheet format as
follows: First Name - Last Name - Email - Identify the Project and Neighborhood.
• Fact Sheets
o To be translated in English and Spanish (front/back).
• Font
o All fonts must adhere to the Futura Family.
■ Title/Headers: Futura STD Book
• Body: Futura STD Light
• Inquiry/Call Log
o The PIO is required to maintain a call/inquiry log that is to be updated on a regular basis and
presented to the project team during every progress meeting. This log will serve as a reference
point for open and closed public inquiries.
• Logo - Miami Beach Rising Above
o The MB Rising Above Logo must be used on all collaterals. Refer to page 23 for more information.
• Templates
o Required to be used for all project information. See page 23 for a complete list of all templates.
• Website updates
o Project information and collateral materials is to be uploaded to the www.MBrisingabove.com
8
Page 693 of 2557
RIS NG
A3OVE
website on a regular basis.
o The Communications Department will provide each PIO firm designated login credentials.
• Weekly Updates/Advisories/Status Updates
o These notices should be created in English only, unless requested by the CMB Project Liaison or
the Communications Department.
o Approval deadline - The Communications Department must receive draft advisories 24 hours prior to
distribution.
• All urgent requests must be submitted via e-mail and a follow-up phone call on their
cell phones with a text message sent to Tonya Daniels and Melissa Berth ier to ensure
delivery.
o Eliminate using technical language.
• Work with your project team to rephrase items into easy to understand explanations.
• Use conversational phrasing.
o Layout-Do not include text in the body of the email. Place the image of the notice and a link to
download the update/advisory in case it is difficult to read when placed.
o Distribution-All weekly e-blasts must be distributed via Constant Contact
• Link must be sent to the Communications Department for distribution on the following
platforms: Next Door, HOA's,citywide e-blast and MB Traffic text messages when
appropriate.
• Link must be sent to the Chief of Staff if information affects city employees.
o No more than three months should pass without sending a project status update.
Wording and Messaging
• OneCity-One Message: Eliminate the use of "The Contractor"or"The Public Works
Department/CIP". instead use "The city".
• Begin all notices with the project benefits and follow with the scope of work and potential
impacts. Focus more on the positives of the projects at the beginning instead of coming right in
with the negative impacts.
• Avoid using red font, bold or all caps to highlight community impacts.
• Eliminate the use of text heavy messaging. instead use bullet points.
9
Page 694 of 2557
� iSl \ G
A3OVE
• Avoid using technical language. Work with your project team to rephrase items into easy to understand
explanations.
Correspondence
• Elected Officials —The CMB Project Liaison should work with the Communications
Department Director and copy the Chief of Staff to notify the Mayor and Commission.
• Media requests—Forward requests to the Communications Department with project team included for
further direction.
• Resilience questions or information requests — The Communications Department will be providing all
PIOs with business cards to be used for any public inquiries. All inquiries can also be forwarded to
MBRisingAbove@miamibeachfl.gov.
Project Reporting
• Monthly Report
c This monthly report is to be submitted to the CMB Project Liaison to then send to the
Communications Office addressing the following:
• Key inquiries or issues
• Weekly Updates or Advisories issued within the month
• Social media and/or media coverage of the project
Once the report is approved it will need to be sent as on LTC by the CMB Project Liaison or any
other appointed City staff member.
• Project Completion Summary
o Upon project completion, the project PIO will be responsible for generating a summary report that
includes the final PRP, final inquiry and call log, database, signed agreement, meeting
summaries, public meeting materials, monthly reports and any other formal documents pertaining
to the project.
Refer to page 23 for both these templates.
Customer Satisfaction Survey
Throughout the life of the project the team is required to issue Customer Satisfaction Surveys. These surveys will
be used as a measuring tool to ensure outreach activities are evaluated and adjusted based on public needs.
Refer to page 23 for a survey that can be disseminated at public meetings, on door-to-door distributions and via
e-mail.
• When distributing information door-to-door, take the opportunity to issue the general customer survey by
using the established project link.
• Be sure to obtain an e-mail address and follow-up electronically with the survey.
10
Page 695 of 2557
RISING
A3OVE
• Utilize CMB's survey platform, MailChimp.
• Surveys are to be conducted throughout the life of the project.
Contact Information
Title Contact Phone Email
Communications Tonya Daniels 305.216.9462 TonyaDaniels@miamibeachfl.gov
Director
City Manager Chief of Marcia Monserrat 305-673-7010 MarciaMonserrat@miamibeachfl.gov
Staff
Communications Melissa Berthier 786.442.7109 MelissaBerthier@miamibeachfl.gov
Assistant Director
Social Media Amanda Carbolic) 305.673.7000 ext. AmandaCarballo@miamibeachfl.gov
6060
Community Resource Kevin Pulido 305.673.7000 ext. KevinPulido@miamibeachfl.gov
Coordinator 2112
Understanding Resilience
Definition of Resilience
Resilience is the flexibility to adapt to unforeseen circumstances and thrive in a dynamic environment. It's the
ability of a person or system to adapt or respond to a change or problem. It is the capacity to recover quickly
from difficulties.
A resilience strategy is the product of a planning process during which a community develops a better
understanding of the challenges it faces; review its ability to address those challenges; and unites people,
projects and priorities so that it may collectively act on its resilience challenges. Resilience goes beyond
conference rooms and construction. It is a mindset for every individual, regardless of age, race and socio-
economic class to view their life. It's investing in your own future through preparation and adaptation, while
promising to build a world for future generations to prosper.
Resilience is often used to describe the way a city is upgrading its roads and stormwater system to prepare the
community for sea level . projections. Resilience is a coveted opportunity, a unique chance to improve resident
quality of life through better and more integrated design. Below ground, this means adding new stormwater,
water and wastewater pipes. Above ground this means constructing new sidewalks, bike lanes, lighting, shade,
green space and even art.
Resilience is also about being prepared for more than climate change. The city is addressing chronic stresses,
such as poverty and poor transportation, as well as acute stresses such as infrastructure failure, a storm or public
health matters. Miami Beach is doing so by introducing initiatives to strengthen public transportation systems,
secure affordable housing and build a vibrant economy, among others.
11
Page 696 of 2557
R1S NG
ABOVE
Resilience FAQs
Is my neighborhood next for road elevation?
The city recently hired engineering design firm, Jacobs Engineering Group, Inc. to develop a multi-disciplinary,
integrated sea-level rise mitigation and stormwater management strategy for the entire city. Providing subject
matter expertise for the city as it evaluates designs for neighborhoods, the firm is highly regarded for
incorporating a strong focus on community input that is interactive and action-oriented, creating a transparent
iterative feedback loop and validation of ideas that will shape the city's cohesive water management plan.
Two of the issues their team will be re-evaluating include the phasing of the neighborhood projects and the extent
of road raising. The team of leading international experts is also committed to maximizing green and blue
infrastructure in their plans, not only by managing the quantity and quality of stormwater, but improving the
aesthetics of the community through streetscapes, traffic calming, urban forestation and pedestrian and bicycle
transportation goals.
According to the planned timetable, Jacobs will begin working in early 2019 and will deliver a concept plan for
Integrated Water Management solutions. The process will include public meetings where everyone will have the
opportunity to share their thoughts with the designers. After the concept place is accepted by the city, the
designers will be tasked with developing the necessary plans to facilitate neighborhood improvements. Designs
are not anticipated to commence until 2020 at the earliest. Residents will be contacted regarding upcoming
community meetings to ensure all are involved in the process to improve their neighborhood.
How will the new stormwater system that the city plans to install improve drainage?
The proposed drainage system will be designed to improve existing drainage conditions for each neighborhood.
The system will be designed to handle all rainwater run-off. The intent is to have any greenspace lower than the
road to act as the recharge area allowing rain to percolate through the ground and replenish freshwater. Run-off
will be collected in the right-of-way using drainage inlets and pipes that will be connected to a stormwoter pump
station and water quality treatment devices before run-off is discharged.
Is the city creating basements and is my flood insurance rate going up as a result?
The concern is understandable given that raising roads is innovative, new and different from what residents are
used to. However, the City of Miami Beach is not creating basements as a result of this work. On the contrary,
the city is taking positive, proactive steps towards building a resilient community for generations through
elevation. Investing in public infrastructure and utilizing the best science to do so, the city is reducing risk and
working hand-in-hand with residents to ensure both public and private properties are in the best position
possible.
In fact, the Federal Emergency Management Agency's (FEMA) definition of a basement is any area of the
building having its flood subgrade, that is below ground level, on all sides. To be classified as a basement, the
adjacent ground would have to be higher than your first floor on all four sides. You would essentially have to
step down into your building.
The height of roads is also not a criterion used in flood insurance, thus raising streets and improving the
stormwoter collection system does not negatively impact flood insurance through the National Flood Insurance
12
Page 697 of 2557
SI \ G
A3OVE
Premium (NFIP). Low-lying buildings are still insurable by your flood insurance.
Mitigation and adaption are not only important ways to reduce risk, but decrease the cost of insurance. In the
top performance tier of all Miami-Dade County cities, Miami Beach participates in the Community Rating System
(CRS), a voluntary program under FEMA that allows communities to earn flood insurance discounts. Under
FEMA's NFIP, cities earn points for conducting activities that promote flood insurance and reduce flood risk.
While flood insurance premiums are increasing due to federal action, the city's efforts to prepare the community
for extreme weather events have improved Miami Beach's CRS rating from a Class 6 to Class 5 designation. A
rare feat for cities, Miami Beach is one of two cities countywide to hold this ranking. This accomplishment has
increased savings from 20 to 25 percent citywide, bringing estimated savings from $6.6 million to $8.4 million
annually effective May 1, 2019.
Another noted method to reduce flood insurance is to have the first finished flood of your property above the
FEMA Base Flood Elevation (BFE). Since 93 percent of all buildings in Miami Beach are located in a Special
Flood Hazard Area (SFHA), the general rule is the higher the lowest livable floor, the lower the flood insurance
premium.
Do stormwater pumps pollute Biscayne Bay?
Crushed plastic bottles, perforated Styrofoam, chip bags, liquor bottles and a red flip-flop - these are just some
of the hundreds of remnants that have washed up inside of one of the storm water pump stations on 10 Street
and West Avenue. Dishearteningly, the majority of refuse being cleaned up is not naturally occurring, but
generated by people.
The city's pump stations provide quality ecological sophistication through pollution control devices. Sifting the
water entering the pump, they remove harmful pollutants before they have a chance to surf down into the bay,
including solids, certain particles and other substances. The city's stormwater pumps successfully prevent several
tons of debris from ending up in precious waterways.
In addition, the city conducts a regular cleaning of the system. Specially-trained crews remove debris from these
systems on a quarterly basis by utilizing a multi-level cleaning process. The four-step pump cleaning process
begins by first, catching large debris; second, filtering sand and particles; third, removing remaining floating
material and finally introducing oxygen into the water to break down unwanted bacteria and improve water
quality.
For over 10 years, the city has been conducting a public area sanitation assessment program to objectively rate
the cleanliness of Miami Beach. The cleanliness index measures against four factors: litter and trash, organic
materials, fecal matter and garbage cans and dumpsters. It measures each on a scale from one to 10, one being
exceptionally clean to six being extremely dirty. Areas assessed include streets, sidewalks, alleys, parks, surface
parking lots, waterways and beach areas. The city's cleanliness has steadily progressed as evidenced by the
index.
Preserving the quality of the waterways and vital marine resources by keeping trash out of the bay is paramount
13
Page 698 of 2557
RIS \ G
ABOVE
in Miami Beach's fight against the rising tide.
Why doesn't the city utilize deep-well injection wells?
In developing its stormwater plan, the city considered the use of deep-well injection wells. To test the effectiveness
of the wells, the city installed a few throughout the island. Not only did they not properly receive water or push it
out, water was pouring out of the wells. This took place in more than one location.
Following a thorough comparative analysis, city staff also found that the construction cost would increase
exponentially as compared to a gravity-based system; wells would use more energy thus increasing the city's
carbon footprint; and finding suitable locations for the wells in our highly-developed environment would be near
impossible.
These wells also don't function as effectively in low-lying regions. No other stormwater system in the State of
Florida utilizes deep-well injection wells for these reasons.
As a result, the city moved forward with utilizing a gravity-based system paired with a pump for the outfalls.
Why is the city raising roads by 3 feet?
Numbers can be tricky, especially when discussing rood elevation. As the city raises public property and
harmonizes all driveway approaches as part of its resilience strategy, city staff assesses needs on a lot-by-lot
basis. What does that mean? Simply put, there are varying elevations in different areas throughout the city.
Across Miami Beach, the city's current policy is that roadways should be at an elevation of 3.7 North American
Vertical Datum (NAVD).
The common misconception is that this means to raise roads in all areas by 3.7 feet; however, it means to raise
roads to the elevation of 3.7 feet NAVD only on the portions of the road where it is not already at that height.
Take the Lakeview Neighborhood for example. Those roadways are already between 2 feet and 4 feet NAVD
based on some recent surveying the city has performed. This would result in the roadways only being raised from
0 feet in many locations to up to 2 feet in some areas.
But, how did the city agree on 3.7 NAVD to be the set height? The city began by finding a common ground for
sea level rise projections and decided to plan based on the findings of the Southeast Florida Regional Climate
Compact in 2015. Committed to planning today's efforts to withstand sea level height in 30 years, the City
decided one foot would be the appropriate height based on the agreed upon statistics of rising seas. The
decision was made for the road base to be above the water. Roads in South Florida are 12 inches thick. Add in
the tail end water condition of 2.7 feet NAVD and the city's criteria becomes 3.7 feet NAVD.
Key Talking Points
Our resilience journey began by flooding in low-lying neighborhoods. The solution to this
emergency event was the implementation of a robust stormwater management plan.
The city began its climate resilience journey by addressing the city's lowest and most vulnerable neighborhoods.
14
Page 699 of 2557
Si I VG
ABOVE
The stormwater plan consists of installing pump stations, raising roads, elevating sea walls and replacing the
city's aging infrastructure. In 2013, areas such as Indian Creek Drive, Crespi Boulevard, and Sunset Harbour
became poster-children for "sunny day flooding". The city took action in 2014 and launched an aggressive
$400 million, 10-year stormwater management program, which has grown to $650 million with an increase in
scope and capacity that includes upgrading the underground piping and pump systems to handle and treat
water for more area than only the public rights-of-way. The majority of this cost is being absorbed by Miami
Beach residents and businesses through their monthly stormwater user fees with other funding sources like the
2015 Interlocal Agreement with Miami-Dade County and the 2018 General Obligation Bond supplementing the
work that needs to be done in many neighborhoods.
Every day, we are examining our plans and projects with a critical eye to protect us well into the future. We are
using the best available science and engineering, investing in our aging infrastructure and are ultimately
adapting to climate change. We're also being proactive, intentional and strategic in building resilience into
everything we plan in hopes of creating a system that will help us bounce back faster.
We are viewed as global leaders in the field.
Today, we're viewed as a global leader in our efforts in climate resilience and we continue to write the playbook
that other municipalities are and will emulate. Cities like Boston, Massachusetts and Fujisawa, Japan have visited
our urban island to learn more about our resilience efforts.
We're consistently and actively looking for ways to improve our resilience strategy via community input and
third-party perspectives. Thanks to these stakeholders and other regional, national and international
collaborations, the city has been able to launch an aggressive, proactive and successful strategy.
The city's future hinges on the support of its residents. Building a resilient community requires communication,
dialogue and continuous improvement. Throughout our resilience journey, we've involved residents and
businesses to join the conversation and provide a vision as well as fine tune our efforts. We've engaged the
community throughout this process, and continue to do so, by hosting public meetings, community surveys and
more.
Taking an opportunity to revisit vital details of a plan with industry leaders is essential to the success of any large-
scale, innovative project. The city is a member of the Rockfeller Foundation's 100 Resilience Cities (100RC)
network, an extensive network of Chief Resilience Officers in other cities, like Miami Beach, who are using
innovative techniques to see what works, while also providing support by tapping leading thinkers from the
private sector and academic space who are bringing new ideas into the fold. In April 201 8, the Urban Land
Institute (ULI), a member of 100RC's Platform of Partners, worked with the city to assess its stormwater
management and climate adaptation strategy. Granting high marks to the city's initiatives, the volunteer panel
advocated for a broader strategy that factors in livability, green infrastructure and economic issues in addition to
stormwater management.
Miami Beach has also invited renowned experts from Harvard School of Design and Columbia University to
examine the city's approach and provide advice — generating a range of recommendations from truly out-of-the-
box ideas to innovative risk modeling. There is no one-size-fits-all approach for infrastructure improvements
15
Page 700 of 2557
SING
A3OVE
throughout the remainder of the urban island.
Led jointly by 100RC and Columbia University's Center for Resilient Cities and Landscapes (CRCL) in August
2018, the Resilience Accelerator Workshop had a significant impact on expanding the scope of Miami Beach's
climate adaptation efforts. In an intense design and implementation discussion group, the Accelerator sought to
introduce a resilience lens into the street elevation project at West Avenue, which had been stalled for months as
a result of community concerns.
The Accelerator helped city staff work through public communications and transparency issues while also
surfacing alternative designs that would create public space and amenities to complement the new streetscape.
The City Commission approved a change order at their December 2018 meeting that opened up additional
funding for the street elevation to continue with added resilience components such as pedestrian and bicycle
routes, as well as more individualized harmonization to match the elevated street to pre-existing properties.
The extensive collaboration and engagement led by Miami Beach and the broader Greater Miami & the
Beaches has set the foundation for these partnerships and helped to launch the city's strategy with solutions and
support necessary to build resilience within the city and across South Florida.
The city's geography makes it vulnerable to climate change.
A city of low-lying islands with over three miles of coastline makes the city a current heavenly utopia and
simultaneously an extremely climate-change vulnerable locale. South Florida is no stranger to wind and flood
risk. Our geographic location on the Atlantic Ocean means that we are at risk to hurricanes and flooding. Our
low elevation allows ocean water to infiltrate inland as the sea rises.
Understanding and preparing for this risk has resulted in the South Florida region having among the most
advanced building codes in the world. Preserving our unique environment and quality life through resilience is
not only crucial for residents, but key to our globally-renown status as a tourist destination.
References & Resources
For more information...
On the city's resilience strategy, visit www.MBRisingAbove.com.
To report flooding, a pot hole, backed up sewer line and more...
Residents are encouraged to make a report via the Miami Beach eGov app or by calling the 24/7 Public Works
hotline at 305.673.7625.
To obtain an elevation certificate...
When acquiring flood insurance, its likely residents will be required to obtain an elevation certificate. An official
FEMA elevation certificate will provide an individual with their home elevation. To obtain one, residents should
contact a local survey company. If they might have one already, they can contact their flood insurance agent or
the City's Building Department at 305.673.7610 to check if there is one on file.
16
Page 701 of 2557
RIS \ G
A3OVE
For more detailed information about Elevation Certificates and diagrams, visit www.fema.gov/elevation-
certificate.
For questions about flood insurance...
Residents should reach out to their flood insurance agent for more information about rates. They have good
working knowledge of National Flood Insurance Premium and can best explain the factors used in flood
insurance availability and cost.
To stay updated on the G.O. Bond Projects, 25 percent of which are directly related to
resilience...
Visit www.GOMB2018.com to see project status and learn more about the projects occurring
in the city.
For other questions and concerns...
E-mail MBRisingAbove@miamibeachfl.gov.
Stats & Facts
A Look at Investment
Complementing the $650 million allocated for stormwater system upgrades, the $439 million general obligation
bond is a clear testament of the Miami Beach voter's decision to invest in the future of their city and ensure a
brighter tomorrow.
Approximately 25 percent of the projects ore directly resilient, including 10 percent of the parks, recreational
and cultural facilities projects.
More specifically, the incorporation of green and blue infrastructure ($17 million) in park projects such as
• Pc: 3/Community Park
• Flamingo Park & Youth Center
• Maurice Gibb Park
• 72 Street Park, Library & Aquatic Center
51 percent of the neighborhoods and infrastructure bond including:
• Resilient Sea Walls and Living shorelines ($10 million)
Above Ground Improvements of planned stormwater and water and sewer projects ($85 million)
• Neighborhood Above Ground Improvements ($43 million)
• Flamingo Park Neighborhood Improvements ($20 million)
• La Gorce Neighborhood Improvements ($14 million)
• North Shore Neighborhood Improvements ($8 million)
Street Tree Master Plan ($5 million)
17
Page 702 of 2557
R SING
ABOVE
• Playing a significant part of the city's plan for expanding green infrastructure, the tree master plan will
strategically plant up to 5,000 trees throughout the island to improve the city's stormwater management
capacities. A large species tree, properly planted, can contribute an added 4,000 gallons of stormwater
management once matured.
• Many projects, including the upgrading of Fire Station #1 and #3, will incorporate resilience elements
due to new design standards or are indirectly resilient such as roof replacement in infrastructure projects
in which green roof designs may be considered,
City of Miami Beach in Numbers
• 92,307 residents
• 230,000 average daily visitors
• 42.1 median age
• 69.2 percent speak a language other than English
• 7 miles of beaches
• 15 cultural institutions
• 77.7 average temperature
• 37 parks and facilities
• #1 hotel destination for South Florida tourists
Fiscal Health
Economic resilience is an important component of overall resilience. Diversified revenue streams, and the
financial ability to prepare for, and recover from shocks and stresses are paramount for not only bouncing back,
but bouncing forward.
• $631 .3 million operating budget
• $48.7 million capital budget
• General fund revenue sources include revenue received from property taxes as well as 53 percent of
funding attributed to tourism ana 10% stemming from different fees for services and permits
City Infrastructure in Numbers
• Ground elevation ranges from 2.4 feet on the west to 1 1 .41 feet on the east with beach dunes reaching
the highest at 20 feet
• 42 monitoring wells established as part of a comprehensive groundwater program
Stormwater Program in Numbers
Miami Beach is one of 30 permitted entities to discharge stormwater in Miami-Dade County, managing 4
percent of the 8,000 outfalls. From 2017 to 2018, there was a 74 percent increase in the amount of stormwater
pumps.
Resilient Building in Numbers
29 building permits for homes and businesses have been obtained to actively build above base flood elevation.
• 26 residence
18
Page 703 of 2557
SING
ABOVE
• 2 commercial-use properties
• 6 completed properties
• 23 properties under construction
Miami Beach's taxable assessed property values are $38.9 billion representing 13.4% of Miami-Dade County's
taxable property values
Historic Preservation in Numbers
• Land Use Boards have reviewed 282 items for sea level rise and climate change criteria in the last year
• World's largest collection of Art Deco architecture
• 20 percent of Miami Beach is located within historic districts
• 44 percent of Miami Beach's assesses property value is located within historic districts
• 67 percent of properties in historic districts are partially, or fully, at an elevation lower than 3.7 NAVD
Transit in Numbers
• 8 miles of green bike lanes
• 6 long-term parking facilities
• Free MB Trolley ranked highest of 25 cities providing circulator service in Miami-Dade County
How Do People Travel?
TODAY
• 64 percent- car
• 11 percent- bus
• 10 percent- pedestrian
• 5 percent - cyclists
• 10 percent- other
VISION FOR 2035
Becoming more resilience by becoming less car-centric. This vision represents a reduction of approximately 99.2
nietric tons of green-house gases per day.
• 43 percent- car
• 20 percent - bus
• 17 percent - pedestrian
• 10 percent - cyclists
• 10 percent- other
Glossary of Terms
1 . Affordable housing: Housing which is deemed affordable to those with a median household income
or below as rated by a recognized housing affordability index.
2. Anthropocene: The era in which human influence has been the dominant force on the environment,
including the climate; the current geological age of the world.
3. Base flood elevation: The calculated elevation to which floodwater is anticipated to rise during a
100-year flood as determined by FEMA and communicated via Flood Insurance Rate Maps.
19
Page 704 of 2557
RIS NG
A3OVE
4. Blue infrastructure: Infrastructure that is linked to water and can refer to new canals, wetlands and
retention on urban plazas and other public facilities to manage water during extreme rain events.
5. Climate adaption: Methods to protect people and places by reducing their vulnerability to climate
impacts. For example, to protect against sea level rise and increased flooding, communities might build
seawalls or relocate buildings to higher ground.
6. Climate change: A gradual, long-term change in the Earth's climate, especially a change due to an
increase in the average atmospheric temperature.
7. Climate mitigation: Efforts that attempt to slow the process of global climate change, usually by
lowering the level of greenhouse gases in the atmosphere. Planting trees that absorb carbon dioxide from
the air and store it is an example of one such strategy.
8. Elevation certificate: An official document indicating the elevation of a property that is used to
provide important elevation information to comply with community floodplain management ordinances
and determine the proper insurance premium rate by FEMA.
9. Flooding: An overflow of water that submerges land this is usually dry. This may occur when water
escapes its usual boundaries, such as from the coast. It can also occur due to the accumulation of
rainwater on a saturated ground or in urban areas, such as Miami Beach, where it can accumulate on
property and in public right-of-way by seeping through stormwater drains.
10.Flood zone: Areas designated by FEMA as being at risk for flooding. Level of risk varies.
1 1 .Freshwater lens: This concept occurs in the coastal regions of many islands, like Miami Beach, and
are essential to ensuring the quality of the local water supply and nourishing vegetation. A freshwater
lens is formed when lower density freshwater infiltrates to the subsurface and floats on top of denser
saltwater, forming a convex lens of freshwater below the surface. The freshwater lens allows greenspace
lower than the road to act as the recharge area allowing rainwater to percolate up through the ground
and feed the vegetation.
12.Green infrastructure: Infrastructure that incorporates both the natural environment and engineered
elements into projects and by doing so conserves ecosystem values and services, beautifies communities,
helps to manage stormwater, reduces heat island effects and increases biodiversity and improves air
quality.
13.Greenspace: An area of grass, trees or other vegetation set apart for recreational or aesthetic
purposes in an otherwise urban environment and contribute heavily to water management and resiliency
approaches.
14.Harmonization: The process of easing the transition between the new raised street elevation to private
properties.
15.Hazard mitigation: According to FEMA, any action taken to reduce or eliminate long-term risk to
people and property from natural disasters. This type of planning is a process utilized by state, tribal and
local governments to identify risks and vulnerabilities associated with natural disasters and develop
mitigation strategies to reduce or eliminate long term risks.
16.Historic preservation: A function of communities that helps maintain a higher quality of life by
preserving its cultural heritage and historic resources by establishing context for development and
encouraging green building practices.
20
Page 705 of 2557
RIS \ G
ABOVE
17.Infrastructure: The fundamental facilities and systems serving a country, city or other area that are
essential to the function of its economy.
18.King tides: The highest predicted tide of the year. During the king tide season, period water levels are
significantly higher than that on an average day. In Miami Beach, this season runs from September to
November.
19.MSL: Mean sea level is an average level of the surface of one or more of Earth's oceans from which
height such as elevation is measured.
20.Natural floodplain: Low-lying areas adjacent to bodies of water that are subject to natural flooding
during intense rain events, extreme high tides and storm surge events.
21 .North American Vertical Datum (NAVD): The current vertical datum as of 1988 for the
contiguous United States and Alaska, excluding Hawaii, Puerto Rico and the Pacific Island territories. The
city utilized this measurement system in regard to road elevation.
22.Personal adaption: The steps individuals take to protect themselves and their properties from extreme
weather events and flooding.
23.Public right-of-way: Public land such as streets and sidewalks that can be utilized by individuals for a
specific purpose.
24.Resilience: The capacity to recover quickly from difficulties.
a. Synonyms: flexibility; toughness; elasticity
25.Resilience strategy: The product of a planning process during which a community develops a better
understanding of the challenges it faces; reviews its ability to address those challenges; and united
people, projects and priorities so that cities can collectively act on their resilience challenges.
26.Runoff: Rainfall that flows over the ground surface and occurs when rain falls on roads, driveways and
other paved surfaces that do not allow water to soak into the ground.
27.Shocks: Sudden, sharp events that threaten a community. This includes hurricanes, tornadoes, coastal
flooding, infrastructure failure, cyberterrorism and more.
28.Special Flood Hazard Area (SFHA): Land areas that are at high risk for flooding.
29.Stresses: Events or circumstances that weaken the fabric of a community on a daily or cyclical basis.
This includes pronounced poverty, an underdeveloped transportation system, aging infrastructure, lack of
affordable housing, rising sea level and coastal erosion.
30.Stormwater drainage system: A network of individual drains and a componentof gray
infrastructure designed to drain excess rain and ground water from imnPrvious surfaces such as paved
streets, parking lots and sidewalks.
31 .Sustainability: The extent of a system in its current state to meet the economic, environmental and
social needs of future generations.
32.Sustainable transit: The capacity to support the mobility needs of a community in a manner that is
the least damageable to the environment and improves the mobility needs of future generations.
33.Urban resilience: The capacity of individuals, communities, institutions, businesses and systems within
a city to survive, adapt and grow regardless of the chronic stresses and acute shocks it endures.
21
Page 706 of 2557
RISI \ G
ABOVE
34.Vertical datum: A unit of measurement that utilizes classic survey methods to measure height
differences (i.e. geodetic leveling) to best fit the surface of the Earth; a surface of zero elevation to which
height of various points are referenced.
35.Water quality: A measure of the condition of water.
22
Page 707 of 2557
RISING
ABOVE
APPENDIX
• Templates
o Advisories and Notices
o Community Impact Questionnaire
o Customer Survey
o Door hanger
o Letter head
o Logo and Specifications
o Monthly Report
o Neighborhood Profile
o PowerPoint Slide
o Project Charter
o Project R.I.S.E Plan
23
Page 708 of 2557
PUBLIC MEETING ._ -
RISING
Indian Creek Greenway Design ABOVE
Tuesday, January 8, 2019
� v6PM - 8PM
,: ; p ' Miami Beach Senior High School - Media Center
�_ , 2231 Prairie Avenue, Miami Beach, FL 33139
t r _ f The City of Miami Beach is hosting a public design meeting to
;. discuss the Indian Creek Greenway project. The purpose of the
"4, ,� � .''_ �� _ meeting is to gather community input to develop a greenway
"- _ . �'+► . - _ masterplan that improves both the landscape aesthetics and
, keihr ," pedestrian experience along the Indian Creek Waterway.
�+ 'yo---
1:
o---
L4 o
For more information,contact 305.673.7071,rodneyknowtes@miamibechfl.gov
- _+ _-rr or visit www.miamibeachfl.gov/city-hall/cip/
r- :-. '
......-
-r
To learn more about this rel project and irrOtjIs aim ineouaivo irdkMMes,Mgt Mlwwrutsbsiit�wr astt;.� 709 of 2557
To request this material in eland*format,sign iravuools interpreter(fir.day notice r.quire4,information on mans for with disabilities,
and/or any aooanar odacton le renew any dnannent ix porkipe r in any dyeperaarad proceedings,call 305.604.2489 and said 1 lir English
or 2 for Spanish,then opium 6;ICY users my ail nu 711 Florida Relay Serve*
. . , .. :,
ADVISORY .` BE ,r l. --
Palm ancf Hibiscus Islands
PRI S I N C it
I
Neighborhood Improvement Project
ABOVE
9 p
What's New i y
Palm Island Entrance Reconstruction (V 1 alt
4R
Traffic Pattern - Phase 2 "``
°as° i k
i t Mid , Ai ot
Benefits
El
The City is beautifying the entrance to Palm i$i
Island and pavers will be installed around the "4"\ ; ROAD
` F "
fountain. "°g°'
!-F!-*-* 4
-��-..-►-'ii-!- - -fes-►
Work Schedule ...
• The work will be completed in phases to minimize i
congestion. Each phase is expected to last LEGEND
approximately three weeks. i
Phase 1 will be completed the weekend of January tt� Phase ze.•Current
• 19 and Phase 2 will commence on Monday,
January 21, despite being a city observed holiday —►Current Phase 2
for Martin Luther King Jr. Day. Traffic Patterns
• To complete the work safely, a new traffic pattern
will be implemented for Phase 2 and will be
updated as the work progresses to the next phase.
Motorists entering the island are directed by v
signage and flagmen on site. i
• Please use caution and pay attention to the N
3 +
detours. «
1
What to Expect
• Tempora' closures around the fountain on Palm
Island.
• Two-way traffic along the east side of Palm Island.
All vehicles must use caution and obey the traffic
pattern.
• Please adhere to the "no parking" restrictions
posted. Vohicles parked in the restricted areas will
be towed at the owner's expense. LEGEND
Who to Contact ' flocs. `-c��n.
Phase2-Current
Work Zone
For more information, contact Maria Alzate at m Phase 3
305.560.8218, maria@iscprgroup.com No *hoe4
or visit www.miamibeachfl.gov/cip
To learn mors about the City's innovative resilience initiatives,visit
To request this material in alternate format,sign language interpreter(f'ivetlay notice required),information on access for
persons with disabilities,and/or any accommodation to review any document or paltic' in any
city-sponsored proceedings,call 305.604.2489 and select 1 for Er egrlli r 'then option 6;
TTY users may tall via 711 (Florida Relay Service). ` ��
RISI \ G
ABOVE
Community Impact Questionnaire
Project Name: (i.e. Palm and Hibiscus Improvements)
Assigned CMB Department:
Assigned CMB Project Liaison:
Assigned Public Information Officer (PIO) and firm:
Project Location:
(i.e. Palm and Hibiscus Islands)
Question Response
Who or what will be most negatively
impacted by the project during construction?
Who or what will be positively impacted by
the project during construction?
Who or what will benefit most from project
outcomes?
What are anticipated issues/challenges
related to increasing neighborhood
knowledge, consistency and trust?
What effects does the project have for the
following:
• Temporary Air Pollution
• Temporary Noise Pollution
• Temporary Vibrations
• Temporary Utility Shutdowns
• Temporary Access Restrictions
• Permanent Impacts
• Other
• Other
Page 711 of 2567
•
RISI \ G
A3OVE
General Customer Satisfaction Survey
Project Name:
Date:
1 . Are you familiar with the improvements in your area?
a. Yes
b. No
c. Somewhat
2. Are you part of the project email list?
a. Yes
b. No
3. If so, are you receiving project updates on the status of the work?
a. Yes
b. No
4. How often?
a. Daily
b. Once a week
c. Once a month
d. Other
5. Is the information provided in the project updates easy to understand?
a. Yes
b. No
6. What is the best way to reach you?
a. Phone
b. Email
c. Text
d. USPS Mail
7. Do you know who your project team is and who to contact if you have any
questions?
a. Yes
b. No
Page 712 of 2W7
R1SI � G
A3OVE
8. Do you have any suggestion on how the project communication can be
improved?
9. Do you have any suggestions on how the City's communication can be
improved?
Page 713 of 2557
1592 Jo PLL abed
Sao+nid eu!RroOw puoysenb
Aug) rwuoisPn0 Pow nii o55/•SL9•S0B
wattwodaa eu!uuOW ety 4.7434toco*seed
woe��sssrtipws
mop1-IPH
lid R-Wd9
610C IL ifAsPiliet
Weicud.qs
email say 0,11111N/01111
M°-9'PI e'pJelan e3)!iwa'ir
*asp lens!pas pup
uoypue!sep p podw!
luewdolewep epa!Jd Pup D!lgnd Jewry p
Memo ey4 u!s,pw(OZ Fou Eno psowuq
rot o put) (►u.udop Alp-irsiueo
ue!41eAum ei4 Pup'OM puq'sway
Bu pnpu!)SiDe4 OZ pot ay!AM°snare
Bu!punolrns eys u!se8uotp eya go podw!
o!wou°oe 8u!pup$srepun sepnpu!Meller
8y jAuel3 pooi iogy6!eu 411 Jai uo d je sew
.1019A-OZ p%Den 04 REM wit)d}°s;uep►seu
4 LWM BuPIJOM s!4713e9 lwa!W 4040 941
UDid aa4 °W
403A-O Main wood
] noes
JNISI �
111
1C\I\ CS-1\le
RISI \ G
ABOVE
Page 715 of 2557
RISING
ABOVE
Page 716 of 2567
R ; SING
ABOVE
Page 717 of 2567
Rising Above Brand Guidelines
Variations
Standard Logo 1 Color: Black 1 Color: White
MIAMIBEACH "v':i tv",'BEACH
RISING RISING RISING
ABOVE ABOVE A3OVE
Colors
rt \\
0i
PANTONE 358 PANTONE 7682 PANTONE 545 PANTONE 2747
R: 170 C:35 R: 103 C:64 R: 197 C:21 R:0 C. 100
G:218 M:0 G: 134 M:43 G:217 M:7 G:27 M:93
8: 145 Y:57 B: 184 Y:8 B:231 Y 4 B: 113 Y:24
K:0 K:0 K:0 K:22
Fonts
Futuro Light Futura Book Futura Family
. i'',,:, i_i � ABCDEFGHUKLMNOPQRSTUVWXYZ
RISING c Iabcdefghilk'mnopgrstuvwxyz
1 J Futuro Light
ABOVL
0123456789
Light, Book, Bold, Book Italic
Reproducing the logo
1.Do Not Stretch the logo horizontally 2.Do Not Stretch the logo vertically 3.Do Not Switch fonts 4.Do Not Change colors 5.Do Not Compromise logo clarity
-- i .i : i •MTBE: H
R I G RI S4 G RI N4 G R I 1I G
- 0
Meeting Notice Template
PUBLIC MEETING RiSiNG ` 4.Rising Above Log.
I.Meeting ldePublic Meeting Tittle ABOVE
Tuesday,January X, 2019 5.Date
6PM-8PM ~
•a.
` tocunon c:Meer-g 6.Location
- XXX,Morn 3euch,11 33'39 4
2.Meeting Related Image - - ""•- :'.t i I .--
• • - .r.. „d ::. rc.oa-: . rer,•.,i,a.rc.o9 e'r tee ao',sm.,'
tea;_--� a:r,:wn,.9,.n ,r- c•..,n x R, ... 7.Meeting Informonon
pr a okra a ,o n e a dal n
OZ. y s,nrn.
a �'+ .,I Mre or doles og,nm cOq q acral w:J5.1:1.1.
!!! i _:• ,•• ..., 8.Contact Information
L mono Y rood iaim!lo.r t wlnP ..ernr.V.�.:
3.ADA Sroremenr 1200,001%.•..�tram wl i.+4ird_®"+......r
."� ��e.w.. 4"3"*°e°.erm,.r sm°°`.'e°'d'+°'e' 9.Miami Beach Logo
M,a.w.r..asntdf....�..r.r ir.il�.'7�VQ
Monthly Outreach Report — January 2019 fj►( .A(-11
Palm and Hibiscus Islands RISING
Neighborhood Improvemet Project
A3OVE
Page 719 of 2557
Monthly Outreach Report — January 2019 BEACH
Palm and Hibiscus Islands RISING
Neighborhood Improvgrpet Project mfr
ABOVE
Page 720 of 2557
BEA
RISI \ G
ABOVE
Neighborhood Profile
Project Name:
Assigned CMB Department:
Assigned CMB Project Liaison:
Assigned Public Information Officer (PIO) and firm:
Project Location:
(i.e. Palm and Hibiscus Islands)
Audience Assessment (Who are the people affected by the project?)
Community
(name of neighborhood,
description of area)
Preferred
Communication
Method
(attitude, perceptions, preferred
communication method)
Pie 721 of 27
rz.. . •
- BEA( r-
S { \ G
ABOVE
Corridor Understanding (What is known about the project area?)
Residence
(houses, condos, single vs.
multifamily units, gates
community, etc.)
Business
(restaurants, retail, hotels, offices,
etc.)
Education
(schools, universities, libraries,
etc.)
Worship
(Churches, temples, synagogues, '
etc.)
Recreation
(parks, beaches, bike trails, etc.)
Parking and Transit
(on-street parking, parking
facilities, transit stops, etc.)
Loading/Valet Zones
(loading zones, valet stations,
waste management locations,
etc.)
Corridor Aesthetics
(loading zones, valet stations,
waste management locations,
etc.)
Page 722 of Z57
RISING
A30VE
Neighborhood Context (What is known about the project area?)
Social/Cultural
(popular gathering spots, social network
trends, resident perceptions, opinions and
behaviors)
Environmental/Geographical
(sea-level projections, flood and evacuation
zone designations, beach erosion risk, land
typography)
Historical
(historic preservation area, hurricane
damage zone, historical flooding zone,
etc.)
Political/Economic
(land use and zoning regulations, policies
and ordinances, state/federal implications,
budgetary/business concerns, etc.)
Fie 723 of 2557
)t V
_fft 111 .
l
. .. .. '-'- '...,,,,--,----- /
k X f=
RISING ,_._= �
ABOVE -
. /
'4,:':,C.0-, 1 '',, ‘4
AMIN
• Text here • Text here • Text here
• Text here • Text here • Text here
Page 725 of 2557
4+J,. •
•S 4', ..�-‘•• iy . :r •
•
'r4.. ''g;- p : F ti
� WDA•.FA.. •!
t f
-771.1;,, ,.• ....._4 ''''''
M
Y A F�-AIt�- � %".:";,•1'414,
R-�I�� �* ATM.
r 4IIII�Im IY •" ! y ',p4,.,.
: " h'
o''''''Y (9 h.MWe•AJ Vt� FA t'sD1 `�t ▪ '� 5• �
.�yi
; , ts
,'A- ' •'•"..'' . '''' - Vr -3sL.'.,lits-0,.-\.,„,-,;::,,:i.,i...1'.':..4. 4:rt•,..4..:‘,.. ,,r7„...,,',...::••,,..,..-', ;.1.'4•4,......
4e614;
M• w F ;`ty t 4M ."11'. • r
r • A }
i}
fir,,
' \ ) F.LJ♦ M nR�..+a 44 t° h ,
•-•-•--- 7 * "' ''' ":.•••"•141r, Yq I 11'',4'1"''t,,,c,tr..,..
....,
-- - . - •. .. „,,, ..'.1"1 7',...,••..`I'oi* 1,, , -
0 , ..r.
rri
:e
Y .'.
� V14.17 .0 •
-
•
.. -'•.r ill ...2%.„- `.:.`- a•,,,ar
TITLE HERE
• Text here • Text here • Text here
• Text here • Text here • Text here
i AC
RISI \ G
ABOVE
Project Charter
Project Name:
Assigned CMB Department:
Assigned CMB Project Liaison:
Assigned Public Information Officer (PIO) and firm:
Project Location:
(i.e. Palm and Hibiscus Islands)
Project Phase Outreach Objective ' Status
Planning Gain community feedback and vision for
the project.
Design Obtain public input on project plans.
Construction Communicate project information and
coordinate day-to-day construction
activities
PROJECT TEAM
Title/Role Name + Department/Agency , Phone Email
{
Page 728 of 2557
RISI \ G
A3OVE
PROJECT SCOPE OF WORK
Project Purpose and Need (Why is this being done? What deficiencies does this
project address? What are the overall benefits?)
(i.e. To prevent flooding in streets, homes and businesses that is caused by rainfall, storm surge and/or rising
tides, and to upgrade water sanitization system to improve drinking water quality. Reduces likelihood of
property destruction and increases health safety for residents.)
Intended Outcomes (What are the project's measurable objectives? What is a
successful outcome?)
(i.e. improved water quality, reduced frequency of stormwater flooding, faster drainage.)
Products Deliverables (List the end-product deliverables. What will be designed,
constructed, installed, replaced, etc.?)
(i.e. Installation of new water meters, sewer laterals, and seawalls, replacement of water main and stormwater
drainage, installation of pump stations, driveway reconstruction, etc.)
I I
General Timeline (When are project phases, milestones, start/end dates? List deadlines
and/or expectations per the contract.)
(i.e. Design Phase—Start: January 2019/ End: April 2019 Construction Phase: TBD. Contractual obligation is
three-month completion. Estimated completion in three to five months.)
Internal Communication Plan (What is the standard for reporting resident inquiries
and feedback? What does the internal feedback look like? When will cross-department
meetings take place? How will all parties remain on the same page?
(i.e. Project PIO will meet with the project team and necessary CMB departments on a biweekly progress
meeting and provide an updated resident inquiries and calls log.)
Page 729 of 2557
`,`is___
RISING
A3OVE
ASSESSMENTS
Constraints and Dependencies (What are potential limitations or roadblocks that
would impact the project? What situations does the project rely on?
(i.e. commission approval, funding, resident acceptance, encroachment removals, harmonization agreement
signatures.)
Risks (What are the significant risks associated with this project?)
(i.e. damaged underground utilities, hurricane season, adjacent projects, high traffic congestion, public
opposition.)
Early Communication (Has any project information been communicated to the public?
Any commitments made?)
(i.e. the City sent out a press release to the residents stating a potential project will Coke place in their
neighborhood. CMB project liaison to provide a copy of this and the contact list of the residents who received
the report. Include any previous charters.)
Page 730 of 2557
R SI \ G
A3OVL
Approval Signature Page
Project Name: (i.e. Palm and Hibiscus Improvements)
Accompanied with the Project Charter includes the Neighborhood Profile, Community
Impact Questionnaire and Project Rise Plan that was reviewed and approved by the project
team.
Dept. Director Date Lead PIO Date
Corn. Director Date Project Liaison Date
Department Date
Department Date
Department Date
Page 731 cif 2557
SI \ G
ABOVE
Project R.I.S.E. Plan
Project Name:
Assigned CMB Deportment: _
Assigned CMB Project Liaison:
Assigned Public Information Officer (PIO) and firm:
Project Location:
I.e. Palm and Hibiscus Islands)
INTRODUCTION
Overview of R.I.S.E. Plan Purpose and Objectives
This Project R.I.S.E. Plan (PRP) is developed as on effective way to ensure community
outreach effort are being coordinated and executed for all transportation projects within the
City of Miami Beach. The PRP objectives are as follows:
✓ Include the information received from the project charter and approved outreach
strategies based on the type of project, communication level and potential
community concerns.
✓ Outline communication levels and decided-on communications plans
✓ Defines project roles, project scope, timelines, deliverables and affected
stakeholders
✓ Detail the informational outreach materials that are to ke developed as part of the
project.
The PRP will serve as a living document that is continuously reviewed and revised by the
CMB project liaison and the PIO throughout the life of the project.
PROJECT TEAM
Title/Role Name Department/Agency Phone Email
Pa 732 of 2557
A3OVE
PROJECT OVERVIEW
Project Overview and Scope of Services
Description of the project limits or boundaries, existing elements of the corridor or
neighborhood, proposed scope of services.
Construction Schedule, Contract Time and Budget
LOCATION MAP
*Insert Map of project location/limits here*
Page 733 of 2557
RI1111.111.:11.AB
PROJECT DETAILS
Potential Controversial Issues
(i.e. improved water quality, reduced frequency of stormwater flooding, faster drainage.)
Maintenance of Traffic
Construction Phasing
AFFECTED STAKEHOLDERS
Potential Controversial Issues
(i.e. parking removal, encroachments, harmonization, roadway elevation, etc.)
Maintenance of Traffic
Construction Phasing
Page 734 of 2557
ABOVE
PUBLIC INVOLVEMENT
Public Involvement Level
Outreach Activities
Outreach Deliverables
Identification of Affected Stakeholders
Public
Local Agencies
Elected and appointed officials
Special interest groups
SPECIAL EVENTS OR PROJECT REQUIREMENTS
Special Events/Holidays to Consider
Legal Documents for Signature
Other Accommodations
Page 735 of 2557
� G
A3 �S VE
OUTREACH SCHEDULE
PRELIMINARY
TASK DEADLINE RESPONSIBLE PARTY
ONGOING
TASK DEADLINE RESPONSIBLE PARTY
POST
TASK DEADLINE RESPONSIBLE PARTY
Pie 736 of 2557