Loading...
Street Progress Report 11/21/19Mid Beach South Beach North Beach W 44TH ST A L T O N R D MAC ARTHUR CSWY WB A L T O N R D C O L L I N S A V E79TH C S W Y 17TH ST I N D I A N C R E E K D R 23RD ST A L T O N R D N B IN DIA N C R E E K D R H A R D I N G A V E A L T O N R D 71 ST S T A B B O T T A V E 1 9 5 - A L T O N R A M P O N W B W 63R D ST 5TH ST W 41ST ST P I N E T R E E D R C O L L I N S A V EDADE B L V D N O R M A N D Y D R L A G O R C E D R VENETIAN CSWY MAC ARTHUR CSWY EB A L T O N R D I 195 WB I 195 EB Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user community SCALE REQUESTED FILENAME DRAWN DATESHEETNO. T r a c k I t N u m b e r 1 1 Street Work PlanMiami BeachMiami-Dade County, FL 11/20/2019 WORKHerSNot To ScaleRoy Coley MiamiBeachGIS 0 0 0 0 0 0 µ Miami Beach GIS • 1700 Convention Center Drive • Miami Beach, FL 33139 • 305.673.7000 • gis@miamibeachfl.gov • www.miamibeachfl.gov F:\WORK\$ALL\Pavement Management\Operations 5 Year Work Plan\GOB\Maps\ArcMap\street_QW_10_3_11X171.mxd State & County Roads In Progress by C.I.P. Near Future Neighborhood Projects Part 1 - Streets Work PlanGOB Status Part 1 Completed Part 1 Scheduled 3 Month Work Ahead 11/21/2019 Streets Completed Square Yards Lane Miles Cost Meridian Ave from 15th Street to 5th Street 20,726 3.5 369,082.60$ Allison Rd from 63rd Street to the end 9,901 1.7 146,236.70$ Biarritz Dr from Normandy Dr to South Shore Dr.3,656 0.6 55,221.80$ Miamonides Street from Rue Notre Dame to Vichy Dr 2,773 0.6 26,771.30$ 15th Street from Washington Ave to Alton Rd 14,629 2.7 $ 270,198.00 10th Street from Ocean Drive to Pennsylvania Avenue 3,225 0.6 43,369.50$ 8th Street from Ocean Drive to Pennsylvania Avenue 2,598 0.5 49,509.00$ Lenox Ave from 6th Street to 11th Street 90% complete. To be completed this week 10th Street fromPennsylvania Avenue to Alton Rd 90% complete. To be completed this week 8th Street from Pennsylvania Avenue to Alton Rd Scheduled Total 57,508 10.2 960,388.90$ General Obligation Bond Progress Report Quick wins completed except for small portion of Biarritz One block remaining on 10th Street to be completed. Expected completion in week of 11/18 Notes: One block remaining on Lenox Ave to be completed. Expected completion in week of 11/18