RESOLUTION 93-20695 RESOLUTION NO. 93-20695
A RESOLUTION AUTHORIZING THE CITY MANAGER
AND FINANCE DIRECTOR TO SET UP WORK ORDERS
FOR THE IMPLEMENTATION OF A CITY WIDE
IRRIGATION AND PARKING LOT LANDSCAPING
RENOVATION PROGRAM.
WHEREAS, the City administration has presented a proposal to begin a program to renovate and
upgrade the City's irrigation systems and parking lot landscaping; and
WHEREAS, funding sources have been identified for this program; and
WHEREAS, the City Commission deems it in the best interest of the City to
proceed with this renovation program.
NOW THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF
MIAMI BEACH, FLORIDA, that the City Manager and Finance Director are authorized to
establish two (2) work orders using funds from the following sources:
1. Work order for repair to park areas - $150,000 from the 1972 Park Renovation Bond fund
# 322.
2. Work order for repair to parking facilities
a) $135,000 from the 1989 Parking Revenue Bond Fund # 485
b) $65,000 from the Parking Department O&M Funds.
PASSED and ADOPTED this 6th day of January , 1993
10 OP i
rYOR
ATTEST:
CITY CLERK
FORM APPROVED
LEGAL EPARTMENT
Cflai
Dat- / / Z--
DK:jd
REF:
CITY of NAIA1v1I BEACH
CITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH FLORIDA 33139
OFFICE OF THE CITY MANAGER TELEPHONE: (305) 673-7010
FAX: (305) 673-7782
COMMISSION MEMORANDUM NO. `.cis
TO: Mayor Seymour Gelber and DATE: January 6 , 1993
Members of the City Commission
M
FROM: Roger M. Carit144( f_
City Manager
SUBJECT: REQUEST FOR AUTHORIZATION TO ESTABLISH WORK ORDERS
ADMINISTRATION RECOMMENDATION:
The Administration recommends that the City Commission authorize the City Manager
and the Finance Director to establish two work orders using funds from the 1972 Parks
Renovation Bond Fund 322, the 1989 Parking Revenue Bond Fund 485 and Parking
Department O&M funds. These funds will be used to implement a two year city-wide
irrigation renovation program and parking lot landscaping improvement program.
BACKGROUND:
In May 1992 the Parks & Recreation Department outlined the problems associated with
the deteriorating condition of the city's irrigation systems (see attached memo). A survey
at that time discovered that 40% of the systems city-wide were in need of repair or
replacement. There are 260 separate locations and nearly 7000 irrigation heads
throughout the city. Most of these systems are operated manually. The difficulties in
managing repairs to and operating this system within the confines of the County water
conservation ordinance were also outlined.
ANALYSIS:.
The memo concluded with the recommendation to initiate a 5 year irrigation system
renovation repair and automation program. By using sub surface irrigation, installing
automation equipment and redesigning systems with fewer heads, it was determined that
many of our present difficulties would be alleviated. Several large projects are planned
at a minimum for the 1992-93 fiscal year. They are Lummus Park, City Hall and the
Bayshore Golf Course area of Alton Road. In anticipation of these improvements, made
possible by the elimination of the night watering crew, a savings of$38,308.00 was taken
into consideration during the recent budget process.
These irrigation improvements will make possible the improvement of the landscaping in
approximately 20 high visibility parking lots. The funding for the landscape materials are
provided for as well from the proposed work order. Project design will be accomplished
by three landscape architectural firms on a rotating basis. Contracts with the firms are
expected to be awarded in approximately 60 days.
FUNDI A--ROVED
96
Manag- !j and Budget AGENDA
I TEM
DATE 1 - R
A total of $350,000.00 is required in order to fund the entire two year program. An
analysis of existing funding sources has identified $150,000 in the 1972 Park Renovation
Bond Fund # 322. These funds will be used for work in parks and park areas. To fund
$200,000 in improvements to Parking facilities, $135,000 from the 1989 Parking Revenue
Bond Fund #485,and $65,000 from the Parking Department O&M account will be used.
Additional right-of-way landscape upgrades will be funded from other sources. These
include governmental grants, private sources and contributions from an "adopt-a-street"
program suggested by Commissioner Gottlieb. These projects will be recommended in
the near future.
CONCLUSION:
Pursuant to the City Manager's instructions to proceed with the program as outlined in
the May 11, 1992 memo, the Administration requests that the City Manager and the
Finance Director be authorized to establish two work orders from which funds can be
drawn for the specified expenditures.
RMC:DK:ah
9P
CITY OF MIAMI BEACH
TO: ROGER CARLTON DATE: MAY 11, 1992
CITY MANAGER
FROM: WILLIAM N. IRVINE
PARKS AND RECREATION DIRECTOR
SUBJECT: CITY WIDE IRRIGATION SYSTEM ANALYSIS
Pursuant to Commissioner Pearlson's request for information regarding the City's
irrigation systems, the following report was prepared.
RECOMMENDATION
1. Implement a five (5) year renovation/replacement program for all City
irrigation systems.
a) Convert appropriate locations to subsurface, low pressure irrigation
systems (Leaky Pipe). This involves the replacement of 6" of top soil
and re-sodding in most areas. This is due to the need to have a
uniform soil particle size to allow the root zone to be uniformly
watered.
b) Convert all large turf areas to automatically operated pop up
sprinklers using the largest size heads possible.
c) Automate as many systems as possible, changing heads to pop-ups
or Leaky Pipe and piping to PVC.
The expertise required to renovate the systems is available in the Parks
p
Maintenance Division; however, the work load simply maintaining the present
system exceeds the capacity of the available staff currently assigned to the
function, thus the following staffing recommendation is made.
2. Provide adequate staff to provide for the long term maintenance of the
improved systems.
a) Assign all irrigation maintenance responsibilities (Parks, Recreation
and Parking) to the Parks Maintenance Division.
99
b) Transfer one (1) Utility Worker from the Recreation Division to the
Parks Maintenance Division.
Two (2) Utility Workers could manage to maintain all of the irrigation
systems g
y s i n the city, assuming the recommendations outlined in #1 above
are carried out. Combining the repair functions of Parks, Recreation and
Parking will provide some efficiencies with regard to purchasing as well as
increased quality of this service. Additionally, as will be outlined in the
potential cost savings portion of this memorandum, other quality of service
increases can be achieved as a result of the reallocation of resources or a
reduction in personnel costs.
As a result of these changes, the Parking Department's maintenance
function would benefit from better supervision of its maintenance crews
since the new system would free up much of the Park Supervisor l's time
which is now used to fix sprinklers. Centralized supervision of this function
will also insure that proper repair procedures are followed, which will aid in
avoiding deterioration of system quality over time.
Taking into consideration the information provided in #1 and #2 above, it is
recommended that the additional Utility Worker be initially assigned to the
renovation/replacement program. Also, an allocation sufficient to purchase the
services of temporary materials for the improvements would be required. This
would provide for the same level of service currently provided, in addition to
providing the resources to renovate 20% of the City's system each year with in-
house crews.
The yearly cost associated with the proposal is as follows:
One additional Utility Worker (reassigned) 24,995
Estimated Temporary Laborer Cost 23,000
Estimated Material Cost 40,000
TOTAL $ 87,995
TOTAL PROJECT COSTS (five (5) year program) $439,975
FUNDING PROPOSAL
It is recommended that this five (5) year project be funded and financed through
two (2) bond issues and the Parking Department O&M Account. The reassigned
Utility Worker would continue to be paid out of the General fund with the exception
of those occasions when he is performing work on Parking Department facilities.
100
A work order will be established to account for all costs of the project using
$150,000 from Bond fund 322 (1972 Parks renovation Bond) and $200,000 from
the 1989 Parking Revenue Bond and O&M Funds. Service costs associated with
parking lot rehabilitation will not be restricted to personnel and material expenses
for irrigation system renovations alone, but will also include substantial
enhancement of improved landscaping and related refurbishment.
The above steps should restore our ability to maintain the city's irrigation systems
in good working order. An additional suggestion, that would help insure the
systems integrity, is to publicize a telephone number that the public could call
when problems are noticed. With this added assistance from the public some of
the difficulties associated with operating automatic systems could be greatly
reduced.
BACKGROUND .
EVALUATION OF SYSTEM UNDER THE PARKS MAINTENANCE CONTROL
The Parks Maintenance division has conducted a comprehensive survey of the
City's irrigation systems. We have been able to derive some useful fact from this
survey as illustrated below.
# of locations (individual:medians,parkways,landscaped areas,parks etc. 260
# of heads of all types 6935
# of valves of all types 1705
# of leaky pipe locations 78
# of broken heads 2830
# of broken valves 179
Age of systems
Seventy five percent of the systems are 25 years old or older. The newer PVC
systems are less than 10 years old and make up approximately 15% of the
total. Leaky pipe installations are no more than five years old and they make
up approximately 10% of the total.
% of broken heads compared to total 40%
% of broken valves compared to total 10%
All damage identified requires a Utility Worker to undertake repairs.
EVALUATION OF SYSTEM UNDER THE CONTROL OF THE PARKING DEPARTMENT
In 1988, a general survey of the physical condition of all parking facilities was
made. This survey recognized that the irrigation systems in these areas were in
uniformly poor condition and recommended that leaky pipe be installed wherever
possible. Since that report, three (3) locations have been converted to leaky pipe
by in-house landscape maintenance crews. However, this would still leave most
of the system in poor condition.
101
•
CURRENT PROCEDURE FOR FIXING DAMAGE
IN PARKS MAINTENANCE
One (1) Utility Worker responds alone to all repair locations at the request of Run
Supervisors, or his own knowledge of damage. Run Supervisors and all Park
Attendants are responsible for cleaning and replacing heads when it does not
require the significant use of tools.
The general operating condition of many systems has declined over thep ast two
years due to the water restrictions that are in effect. These restrictions, which are
now mandated by County- ordinance, have changed the way that we water.
Previously all Run crews were required to water their areas, whereby systems
would get cleaned, adjusted and repaired by them on a regular basis. Now, at
best, the crews have 1 1/2 hours a day, between 7:30 a.m. and 9:00 a.m., to
accomplish this task. A night watering crew of two can manage to water only the
high visibility locations, and is at a disadvantage when it comes to doing any
repairs due to the limited amount of light available at night. The previous system
was further negatively affected by the budgetary reduction in the number of
supervisors two years ago. In 1989, the Parks Division had twice the number of
supervisors, all of whom had the mobility, time and knowledge necessary for minor
sprinkler system maintenance. In order to partially remedy this situation, we have
recently reorganized the Division so that one supervisor will have the time to check
out, clean and to some extent, operate all of the irrigation systems city-wide. This
should ensure that most systems remain in somewhat better condition so that Run
crews can operate them effectively during the time permitted by the County
ordinance.
The problem of more involved repairs, which is what is identified to the
aforementioned survey, still remains. We are very fortunate to have an effective,
conscientious and productive Utility Worker on staff at this time. He has, since
transferring from the Convention Center six months ago, been systematically and
comprehensively fixing problems that have been overlooked for years. This has
been in addition to trying to keep the overall system in operating condition. The
quality of his repairs reduces, or eliminates, return visits. His productivity is
exemplary. Regardless of this employee's performance, the sheer volume of work
is beyond his ability to keep up with the demand for service.
IN THE PARKING DEPARTMENT
The Parking Department is in a similar, yet more difficult, position in that it does not
have a Utility Worker available to perform repairs or system upgrades. The Park
Supervisor I assigned to the area is performing these duties, which naturally takes
him from his supervisory and landscape maintenance responsibilities.
102
SYSTEM AGE AND GENERAL DESIGN CONSIDERATIONS AFFECTING SYSTEM
REPAIR AND OPERATION
Many of the city's irrigation systems, being over 25 years old, are galvanized pipe
construction. These systems are clogged with rust and are prone to springing
leaks due to corrosion. Many threaded locations have been repaired so many
times that they now must be replaced in order for a long lasting repair to be made.
The newer systems are constructed with PVC pipe which is easier to repair.
Virtually all of our installations are operated manually, either by turning on a valve
or connecting a sprinkler in to an underground piping system. This makes the
process of watering the city's landscapes very labor intensive.
Most systems are in serviceable condition; however, there is not adequate staff
available to keep the systems in operating condition at all times. Many of the city's
older systems are of the typical spray head type that are characterized by many
heads which individually cover only a small area. Leaky pipe has been
successfully used to eliminate this type of head from median strips. When new
systems are designed for larger turf areas (only very recently) we recommend that
heads which individually cover larger areas be used. Leaky pipe is most cost
effective when used on small or irregularly shaped parcels. Systems using self
contained sprinklers that cover large areas, as opposed to quick coupler systems
that use a limited number of movable heads, are more expensive to install. Self
contained sprinklers are certainly more cost effective, especially over the long run
when operated automatically.
POTENTIAL COST SAVINGS
irri irrigation systems were automatically operated, it would not be
If all ofthecity's g y
necessary to have crews watering at night. Further, if in the first six (6) months of
the renovation replacement project six (6) of the City's high visibility areas could
be converted and this crew could be eliminated. These resources could then be
redirected to improve the City's overall appearance as it relates to landscaping or
could be eliminated achieving a first year savings to the general fund of $19,154
and an annual savings thereafter of $38,308, not including fringes.
Assuming a five-(5) year renovation program,that the Utility Worker represents the
reassignment of an existing expense and only $35,000 of his time is charged to
parkingfacilities, and in addition the total general fund savings is taken, the
additional cost (using today's cost figures) and payoff periods are as follows:
Five year cost of Utility Worker 5 x $ 7,000 = $ 35,000
Five year cost of temporary labor 5 x $23,000 = $115.000.
103
Five year cost of materials 5 x $40,000 = $200,000
TOTAL COST $350,000
Net yearly savings $ 38,308
Years to recover renovation program costs $350,000/$38,308 = 9.14 years
From a strict financially based-cost benefit viewpoint, it is obvious that it will take a very
short time to realize a return on the proposed investment. Additionally, the spin-off
benefits from the improved appearance of the City's public areas, made possible by better
irrigation, could further be construed to accelerate the economic benefit of implementing
the renovations.
In a tourist oriented community such as ours, there is certainly an economic impact made
by attractive landscaping. There are also savings to be realized when you consider that
valuable landscape materials will not need to be replaced if they are watered properly.
In the case of parking facilities, additional revenues are probable based on an improved
user perception of quality and value that can be created with the maintenance of healthy
attractive landscaping.
There are additional benefits specifically related to the installation of Leaky Pipe. As a low
volume type of system, it has been estimated that approximately 50% less water is used
to water any given area. We have also benefitted from improved public perception, as
evidenced by fewer complaints, in that we no longer water the street with overspray in the
areas where Leaky Pipe has been installed.
Should you occur with our general proposal, we will take the necessary steps to establish
the required work order and initiate the program.
WNI:jd
cc: Stuart Rogel, Assistant City Manager
Jim Borgmann, Director of Parking
Daniel Keys, Superintendent of Parks
104
xibuLu'L' Uri NO. 92-20695
Authorizing the City Manager and Finance
Director to set up work orders for the
implementation of a City wide irrigation
and parking lot landscaping renovation
rogram.