Loading...
RESOLUTION 92-20686 • CITY OF "AMI BEACH ' TO: Richard Gatti DATE: 1/11/93 Public Works FROM: Richard E. Brown,r16 City Clerk SUBJECT: Streetscape Improvement Project Enclosed are 5 agreements with the State of Florida Department of Transportation pertaining to the North Beach Streetscape Improvement project for signatures of the appropriate officials and attestation by the Executive Secretary or Notary. Please request that the agreement in the blue-back cover be returned to Mercy Williams in this office. She will subsequently forward a fully executed copy for your files, together with a copy of the authorizing Resolution No. 92-20686. Thank you. E If t i RESOLUTION NO. 92-20686 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE A LOCAL GOVERNMENT REIMBURSEMENT PROGRAM JOINT PARTICIPATION AGREEMENT WITH THE STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION PERTAINING TO THE NORTH BEACH STREETSCAPE IMPROVEMENT PROJECT WHEREAS, the City is undertaking a North Shore public area improvement project; and WHEREAS, the State of Florida Department of Transportation has planned to undertake milling and resurfacing, repairing of sidewalks, repairing of curb and gutter in portions of the area of the City project; and WHEREAS, in order to coordinate the two projects, and utilize the same contractor for both projects, the City wishes to enter into the Local Government Reimbursement Program Joint Participation Agreement attached hereto. NOW, THEREFORE, BE IT DULY RESOLVED BY THE CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Clerk are hereby authorized to execute a Local Government Reimbursement Program Joint Participation Agreement with the State of Florida Department of Transportation pertaining to the North Beach Streetscape Improvement Project. PASSED and ADOPTED this 16th day of December , 1992 . 1PP ATTEST: AI IP 1 , ,_,A L-T-6N6Nii,"...__ ("----- q.,ut,_ ity Clerk Mayo • PNB: lm Encl. C:\resoluti\northsho.rev FORM APPROVED 12/16/92 LEGAL DEPT. By -2—C'D Date 0/ Z0/.402__ • 1 • • • CITY OF MIAMI BEACH CITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH FLORIDA 33139 OFFICE OF THE CITY MANAGER TELEPHONE: (305) 673-7010 FAX: (305) 673-7782 COMMISSION MEMORANDUM NO. '1 TO: Mayor Seymour Gelber and DATE: Members of the City Commission Dec. 16, 1992 FROM: Roger M. Canton Cit Manager -/ Y 9er l -- SUBJECT: LOCAL GOVERNMENT REIMBURSEMENT PROGRAM, JOINT PARTICIPATION AGREEMENT BETWEEN THE STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION AND THE CITY OF MIAMI • BEACH, FLORIDA, FOR THE NORTH SHORE COMMUNITY AREA IMPROVEMENT PROJECT ADMINISTRATION RECOMMENDATION: The Administration recommends that the City of Miami Beach enter into a Local Government Reimbursement Program, Joint Participation Agreement, with the Florida Department of Transportation (FDOT) relating to combining the FDOT Collins/Abbott/Harding Avenues Milling and Resurfacing Project with the City of Miami Beach North Shore Community Area Improvement Project, and outlining FDOT costs and • a scheduled manner of reimbursement to the City of Miami Beach. BACKGROUND: In the conceptual development of the North Shore Community Area Improvement Project a number of meetings were held with the Florida Department of Transportation relating to sections of the project on State right-of-way. At the same time, FDOT has in the same areas a proposed project to accomplish milling and resurfacing of the streets, with minor replacement of sidewalks, curbs and gutters. In response to the City's request, FDOT agreed that it would be far more cost efficient and effective to combine the projects into one contract, thereby, reducing the cost of engineering and construction, and also minimizing the time of disruption to the area. A general distribution of participation by area was agreed to as follows: ROADWAY SEGMENT AGENCY 1. Collins Avenue - 59th to 75th Street CITY/FDOT 2. Abbott/Harding Ave. - 67th to 75th Street FDOT 3. Ocean Terrace - 73th Street to 75th Street CITY 4. 73rd Street - Collins Avenue to Ocean Terrace CITY 5. 74th Street - Collins Avenue to Ocean Terrace CITY 6. 75th Street - Collins Avenue to Ocean Terrace CITY 7. 71st Street - Rue Notre Dame to Collins Avenue CITY FDOT* 8. Normandy Drive - Rue Notre Dame to Bay Drive CITY 9. Rue Notre Dame - Normandy Drive to 71st Street CITY 10. Special Projects CITY * FDOT participation is from Bay Drive to Collins Avenue 113 AGENDA I TEM DATE - z } 1 r r • z a r COMMISSION MEMORANDUM PAGE 2 DECEMBER 16, 1992 JOINT PARTICIPATION AGREEMENT BETWEEN THE STATE OF FLORIDA AND THE CITY OF MIAMI BEACH FOR THE NORTH SHORE COMMUNITY AREA IMPROVEMENT PROJECT The City's portion of the total project will consist of funding landscaping, decorative streetlights, decorative sidewalks and crosswalks,the placement of street furniture and special treatment of identified areas such as the fountain on 71 Street and the Ocean Terrace area. A separate maintenance agreement will be required with FDOT for these decorative improvements on State of Florida right-of-ways. FDOT's portion of the project will consist of funding the milling and resurfacing of the roadway areas along with some identified sidewalk, curb and gutter replacement. Additionally, FDOT will also fund, under a separate contract, the upgrading and installation of modern traffic signal standards. This separate contract is being funded from Hurricane Andrew emergency funds. Bids for this traffic signal work will be received on February 23, 1993, with construction starting within 90 days thereafter. Financial Overview: Preliminary Estimate of Total Improvement Costs $11,730,000 FDOT Participation Traffic Signals under Separate Contract $1,610,000 FDOT Roadway Improvement $1,657,000 $3,267,377 Total Funds Needed Through Assessment $ 8,462,623 FDOT participation is estimated to represent 28% of the total project amount. CONCLUSION: On November 4, 1992, the City Commission authorized proceeding with the final design documents for the North Shore Community Area Improvement, including the design plans for the roadway improvements proposed by FDOT. The work on the City's portion has started and FDOT work is being delayed pending the passage of an Interlocal Agreement. On December 8, 1992, an advertised public meeting was held in the North Shore Community to allow citizen review of the purpose, design and funding, including a definitive estimate of the assessment to property owners. There were approximately 60 attendees at the meeting. The overwhelming consensus was to move forward with the project. The Administration recommends approval of the Interlocal Agreement between the City of Miami Beach and the Florida Department of Transportation. RMC\RAG\b C:\bjs\cm-resol\cm-nshor 144 ***************************************************************** WPI NO. 6113777 FUND 010 SAMAS APPROP. 088793 FUNCTION 215 SAMAS OBJ. 563040 JOB NO. 87060-3569 F.A. No. ORG. CODE. 55064010606 CONTRACT NO. VENDOR NO. VF596000372001 ***************************************************************** LOCAL GOVERNMENT REIMBURSEMENT PROGRAM JOINT PARTICIPATION AGREEMENT STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION AND CITY OF MIAMI BEACH FOR NORTH SHORE REVITALIZATION PROJECT This AGREEMENT, made and entered into this day of 19 by and between the STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION, hereinafter called the "DEPARTMENT" , and CITY OF MIAMI BEACH, hereinafter called the "LOCAL GOVERNMENT. " • • 146 AGENDA - II ITEM DATE 1 2 -1 -c't • • I1 o ' WITNESSETH WHEREAS, the DEPARTMENT is prepared to participate under the Local Government Reimbursement Program pursuant to Section 339 . 12 (5) F. S. for the estimated eligible cost of the "PROJECT" described as follows: The City of Miami Beach currently has a North Shore Revitalization Project which involves a streetscape improvement program to the area on Collins Avenue from 1500 feet south of 63rd Street to 75th Street, and on 71st Street from Collins Avenue •to Rue Notre Dame. The project will consists of landscaping, providing decorative street lights, decorative sidewalks, decorative crosswalks, and the placement of sidewalk bench furniture. The DEPARTMENT has, in it' s work program, a project which includes the same area. The limits of the DEPARTMENTS project are on Collins Avenue and on Abbott Avenue/Harding Avenue from 1500 feet south of 63rd Street to 75th Street and on 71st Street from Collins Avenue to Bay Drive. The scope of work for the DEPARTMENTS project consists of milling and resurfacing, repairing of sidewalks, repairing of curb and gutter along the DEPARTMENTS project limits. The purpose of this agreement is twofold: 1 . To allow the LOCAL GOVERNMENT to design and let to contract the DEPARTMENTS project in conjunction with the LOCAL GOVERNMENTS North Shore Revitalization Project. 2 . Outline the DEPARTMENTS project costs and the scheduled manner of reimbursement to the LOCAL GOVERNMENT. • This overall effort will hereinafter be called the "PROJECT" , and, WHEREAS, the LOCAL GOVERNMENT is eligible for participation in the Local Government Reimbursement Project pursuant to Section 339 . 12 (5) , F. S. NOW, THEREFORE, in consideration of the mutual benefits to be derived from joint participation in the PROJECT, the parties agree to the following: 147 • 1 . The purpose of this agreement is to provide for the allocation of state financial assistance to eligible local governments on project eligible pursuant to F. S. 339 . 12 (5) and/or the Florida Transportation Plan. 2 . The LOCAL GOVERNMENT will prepare the plans, specifications and estimates for the project. The plans must be submitted for review in accordance with the Department' s phase review process. The Department will review and return comments within a period not to exceed 30 days. This process requires sufficient copies to be transmitted to the Department for 30% , 60%, 90% and 100% complete construction plans reviews. Projects on the State Highway System will incorporate Department Standards and will be reviewed and approved by the DEPARTMENT and the Federal Highway Administration, if federal aid funds are used, prior to letting. If federal aid funds are used, the LOCAL GOVERNMENT must be qualified and authorized by the FEDERAL HIGHWAY ADMINISTRATION to perform the appropriate project phase. Except as otherwise authorized in writing by the DEPARTMENT, the LOCAL GOVERNMENT shall not execute any contract or obligate itself in any manner requiring disbursement of Department funds, including consultant or construction contract or amendments thereto, with any third party with respect to the project without the written concurrence of the DEPARTMENT. The DEPARTMENT specifically reserves unto itself the right to review the qualifications of any consultant or contractor and to approve or disapprove the employment of the same. It is understood and agreed by the parties hereto that participation by 148 1 ! �t tt the DEPARTMENT in a project with LOCAL GOVERNMENT, where said project involves a consultant contract for engineering, architecture or surveying services, is contingent on the LOCAL GOVERNMENT complying in full with provisions of Section 287 . 055, Florida Statutes, Consultants Competitive Negotiation Act. In all cases, the LOCAL GOVERNMENT shall certify to the DEPARTMENT that selection has been accomplished in compliance with the Consultant ' s Competitive Negotiation Act. 3 . The LOCAL GOVERNMENT will let and administer the PROJECT. The LOCAL GOVERNMENT shall obtain a permit from the DEPARTMENT prior to entering upon DEPARTMENT Right-of-Way to accomplish the construction. 4 . The LOCAL GOVERNMENT agrees to administer this PROJECT in compliance with all laws governing the DEPARTMENT. 5 . Funds provided by the DEPARTMENT through this agreement shall be expended exclusively for the DEPARTMENTS project within the said DEPARTMENTS project limits. All in accordance with the DEPARTMENTS scope of work indicated in attachment "A" . y 6 . The DEPARTMENT shall provide the LOCAL GOVERNMENT the DEPARTMENTS PROJECT estimated eligible cost as follows: a. Project Design - up to $138 , 115 b. Construction Engineering - inspection (C. E. I . ) up to 149 $138 , 115 and construction up to the contract amount ($1 , 381 , 147) for work items identified as the DEPARTMENT scope of work indicated in attachment "A" . The DEPARTMENT' S participation shall be limited to all the costs identified as the DEPARTMENT scope of work as indicated in attachment "A" and any field changes as may be required relating to said scope of work and agreed to in writing by both parties: Schedule of Disbursements 1st Qtr. 2nd Qtr. 3rd Qtr. 4th Qtr. Engineering/Design 31 , 076 31 , 076 31, 076 44 , 887 The disbursements for the incurred engineering design, construction, and C. E. I . expenses shall only be made on a reimbursement basis, upon submission, to the DEPARTMENT, of paid consultants and/or contractors invoices, but not to exceed as follows: Beginning from execution date of Joint Project Agreement to June 30, 1993 - $961, 235 , and from July 1, 1993 to June 30, 1994 - $696 , 142 . The total amount for the project design, project construction, and construction engineering inspection (C. E. I . ) shall not exceed $1, 657 , 377 . 7 . The LOCAL GOVERNMENT and the DEPARTMENT will be responsible for cost overruns identified within their respective scope of work. 8 . In the event this Contract is in excess of TWENTY FIVE 150 • i 1 �1 11 THOUSAND DOLLARS ($25 , 000 . 00) or has a term for a period of more than one year, the provisions of Chapter 339 . 135 (7) (a) , Florida Statutes are hereby incorporated. "The Department shall not, during any fiscal year, incur any liability, or enter into any contract which by its terms, involves the expenditure of money in excess of the amounts budgeted as available for expenditure during such fiscal year. Any contract, verbal or written made in violation of this subsection shall be null and void and no money shall be paid thereon. The Department shall require a statement from the Comptroller of the Department that funds are available prior to entering into any such contract or other binding commitment of funds. Nothing herein contained shall prevent the making of contracts for a period exceeding one year, but any contract so made shall be executory only for the value of the services to be rendered or agreed to be paid for in succeeding fiscal years; and this paragraph shall be incorporated verbatim in all contracts of the Department in excess of $25, 000. 00 and having a term for a period of more than one year. " 9 . The LOCAL GOVERNMENT agrees to keep complete records and accounts in order to record complete and correct entries as to all cost, expenditures and other items incidental to the offering for public bid and prosecution and construction of the PROJECT. No funds provided by the DEPARTMENT shall be expended for other than eligible expenses for the PROJECT. Such books and records shall be available at all reasonable times for examination and audit by the DEPARTMENT, as well as other State and Federal auditors. Incomplete or incorrect entries in such books and records will be grounds for disallowance by the DEPARTMENT of any fees, expenses or costs based on such entries. 10 . The LOCAL GOVERNMENT agrees to keep such records and accounts and to require any and all contractors and subcontractors 151 i t it it to keep such records and accounts as may be necessary to substantiate its request for payment from the DEPARTMENT. Such books and records shall be available at all reasonable times for examination and audit by the DEPARTMENT and shall be kept for a period of five (5) years after the completion of all work to be performed pursuant to the Agreement. Incomplete or incorrect entries in such books and records shall be grounds for disallowance by the DEPARTMENT or any fees or expenses based upon such entries. 11. The LOCAL GOVERNMENT agrees to submit bill for fees or other compensation for services and expenses in detail sufficient for a proper preaudit and post audit. 12 . The LOCAL GOVERNMENT agrees that bills for any travel expenses be submitted in accordance with Section 112 . 061 , Florida Statutes. 13 . The LOCAL GOVERNMENT agrees that the Department shall • have the right to unilaterally cancel this agreement for refusal by the Local Government or its contractor to allow public access to all documents, papers, letters or other material subject to the provisions of Chapter 119, Florida Statutes. 14 . The LOCAL GOVERNMENT warrants that it has not employed or obtained any company or person, other than bona fide employees or consultants of the LOCAL GOVERNMENT to solicit or to secure this Agreement and it has not paid or agreed to pay any company, 152 corporation, individual or firm, other than a bona fide employee or consultant employed by the LOCAL GOVERNMENT. For the breach or violation of this provision, the DEPARTMENT shall have the right to terminate the Agreement without liability at its discretion and to withhold additional payments or funds budgeted and allocated for the PROJECT. 15. This Agreement or any interest herein shall not be assigned, transferred or otherwise encumbered under any circumstances by the LOCAL GOVERNMENT without the prior written consent of the DEPARTMENT. However, the Agreement shall be binding to the DEPARTMENT and its successors. 16 . To the extent allowed by the laws of Florida, the LOCAL GOVERNMENT hereby agrees to indemnify, defend, save and hold harmless the DEPARTMENT from all claims, demands, liabilities and suits of any nature arising out of, because of, due to any negligent act or occurrence or omission or commission of the LOCAL GOVERNMENT, its agents, or employees. It is specifically understood and agreed that this indemnification clauses does not cover or indemnify the DEPARTMENT for its sole negligence or breach of contract. Performance of this Agreement is the specific consideration from the DEPARTMENT to the LOCAL GOVERNMENT for the LOCAL GOVERNMENT' S indemnity agreement. LOCAL GOVERNMENT agrees to have its construction contractor indemnify the DEPARTMENT in the same language or to the same extent as the LOCAL GOVERNMENT as authorized by law as the LOCAL GOVERNMENT. 153 • 17 . This agreement shall continue in effect and be binding on both the LOCAL GOVERNMENT and the DEPARTMENT until the PROJECT is completed, final costs are known and appropriate reimbursements are made by the LOCAL GOVERNMENT or DEPARTMENT. 18 . If the LOCAL GOVERNMENT abandons the PROJECT or for any reason the commencement, prosecution, or timely completion of the PROJECT by the LOCAL GOVERNMENT is rendered improbable, infeasible, impossible, or illegal, the DEPARTMENT may, by written notice to the LOCAL GOVERNMENT, suspend any or all of its obligations under this Agreement until such time as the event or condition resulting in such suspension has ceased or been corrected, or the DEPARTMENT may terminate any or all of its obligations under this Agreement. 19 . The DEPARTMENT shall exclude all PROJECT costs incurred by the LOCAL GOVERNMENT prior to the effective date of this Agreement or prior to the date of the PROJECT grant application. 20. If the PROJECT is on the State Highway System the MBE requirements of 49 CFR Part 23 and Section 339 . 0805, F. S. , shall apply to the Agreement. Minority business enterprises and disadvantaged business enterprises shall have the maximum opportunity to participate in the performance of PROJECT contracts. 21. The LOCAL GOVERNMENT and its contractors shall not discriminate on the basis of race, age, color, national origin, or sex in the award and performance of PROJECT contracts and the • 154 selection of applicants for employment in connection with the carrying our of any PROJECT. 22 . If any provision of the Agreement is held invalid, the remainder of this Agreement shall not be affected. In such an instance, the remainder would then continue to conform to the terms and requirements of applicable law. 23 . The parties agree that venue for any legal processing arising out of this agreement shall be in Dade County, Florida. IN WITNESS WHEREOF, the LOCAL GOVERNMENT has caused this JOINT PROJECT AGREEMENT to be executed in its behalf this day of , 19 by the CHAIRMAN, authorized to enter into and execute same by resolution No. of the Board on the day of , 19 . LOCAL GOVERNMENT DEPARTMENT OF TRANSPORTATION BY: APPROVED FOR FUNDING: TITLE: COMPTROLLER ATTEST: (SEAL APPROVED AS TO FORM, LEGALITY AND EXECUTION TITLE: ASSISTANT ATTORNEY DEPARTMENT OF TRANSPORTATION DIVISION ADMINISTRATOR FEDERAL HIGHWAY ADMINISTRATION DISTRICT SECRETARY FORD APPROVED DISTRICT 6 LEGAL DEPT. ATTEST. (SEAL_ EXECUTIVE SECRETARY By OR NOTARY Date /2—/0/1Z- 155 R.I'E!iT I-)ATF ;21.1IIL92 TATS OF FLORIDA f EPARTMENT OF TRANSPOATATI3N PREVIOUS VIOUS JP:)ATE 21JJL92. 16.44. 29 ESTI"1ATES DFFICE i Er4G INri-.ERI NG SliPist3RT SERVICES LONG RA GST I- -INPUT-DATA-�A Tom- -- ------- - ------ --- 1--'- ! **t -I ' *4. - : ** ' r • DA A ** PREVIOUS TOTAL= $626 104.24 (SCREEN 1) l • 1 ATE 21 JUL 92 .U.6 4;29 PROD. MANAGER: T ALVA E Z - MILES 1.344 FIS/YR. 1993 - PROJECT NO. $7060,.:.$560 TYPICAL 'SECTION RSA SECNUMBER: 0 ., WPZ NO. 6113777 T1-___. -- .� i N I MEDIAN: : - GA EXISTING LAVES: 3 R/W LEFT: 0.000 R/Va RIGHT: 0.000 5 PROJECT DESCRIPTION: COLLINS AVE MILLING AND RESURFACING BETWEEN 63 ST r4 c COMMENTS : AND 75 ST (STAT IONS 16+00 TO R7+00) .� E.ACT R ARTNW R ** ******** ************** MOBILIZATION I9 � 1(1.�}t�� MAIC A.�f~ �T T� �C �.0�.(� R I NAGE . �� U A N 0 000. OAROW I IPS. • • 120 CL . �. ,2 � � �R LTE: I ITE /A R5T :NN PIT AC.. ,1 **** **** SHOULDER DATA ********************************* ----. TOT WIDTH LT 0.000 TOT WIDTH RT 0.000 4 PAVE WIDTH LT 0.000 PAVE WIDTH RT 0.000 15 - .I3.A.S.F T TFM .. .. ._ BASETHICK 0.000 TZ- SURF I TEM SURF.. THICK 0.000 . _ 1 17 Ni . CURB WIDTH LT 0.000 CURB W DTH R CURB IT��! ��U. �....r._. �� � T I)so 000 • . :1a f] S0 W T T �3 $ � RI 0 �+r 00 <_ (SCREEN 2) *************** , . *** . * ******** :4000 :5:.� W WIDTH RT 0.00 20 RD WIDTH LT 22.000 ROADWAY DATA ********** *********************� ( EEN 2) ITEM RD WIDTH RT 22.000 ?2 STAB ITEM ___N/A LEVEL ITEM 333 2 9 LEVEL THK 0.000 TACK ITEM 300 1 3 �.. M41L ...ITEM T 24A SE ITEM E - ..�.�. _ .... . . N I CIS , > _ . U. :F IT "M.::: . /` IT E.N �. 1 (3R I V SWAY: R,ES .. :. 6 . 0.X00 PI�EWAY �3M Q W/WIDTH LT 04000 : .. W WIDT.1 :T 0.ao0 . - :._. 28 W/BASE ITEM ___N/A____ W/THICK 0.000 2 E��GF STRIPE 1 CENTER STRIPE 1 Jr) *#******************************** MEDIAN DATA ********************************* �-- 3�. - -� - �0--�±.1S�TH._._. ..... _ 0 000 MED SOD LT _ 0.000 MED SOD RT _ 0.000 32 M ..CURi ITEM __._ 0 .U : L .. 0.00.0-... MED CURB RT 0.000 . -_ ��_ L M SHL0 WI DTIC 0;700-, • - DTH . # ****************** s ... :��� ��.0 �l�I3TU 0.000 IGNI ANG LIGHT ....' **** ** **** * * SIG 4 :t ST ..E�t MILE 15000.00- 0 T NG (SC P.. 3) * ********************** - _ LI COST �S t3.04 ` _ ,.3 X-ITEM �X ITE. NUM3ERS *******************************- (SCREEN 3) 36 X-ITEM 32.7 70 5 X-QTY 34711.000 X-ITEM X-UTY 0.000 3; X-I TEt•I X-QTY 0.000 X-ITEM X-QTY 0.00038 _X-ITEM • - X-' TY 0.000X--QTY _ 0.000 __ 41." EX E - 110-- x-ITEM 4 --.E - TY 1'0663►; 0Q- 7:777E UNIT PRICE_ 000 ' EX•-• ITEM 520 I 10 EX-QTY. 14200 . 41 " 00#� EX-,UNIT.. PRICE 9.000 a2 X+ITEM 522 1 EX:-,QTY 789€ .0 E�_U�IT PRICE 15.000 ,4� .. EX-ITEM_ -�,. 180.000 E NI PRICE 75.000 FX-ITEM 6b0 2101 EX-QTY 54.000 `. 00 PkICE 350.00 J *********************************** BRIDGES ************************************ -- TYPE NUMBER. LENGTH 0.000 WIDTH 0.000 FACTOR 0.000 -- -_ TYPE NUMBER _ LENGTH 0.000 WIDTH 0.000 FACTOR 0.000 �' TYPE NUMBER LENGTH ' . ��, c WIDTH 0.000 FACTOR . ..0 $ ...:. r TYPENUMBERLENGTH 0.000 J WIDTH 0.110. F AC .. 0.030 . TYPE NUMBER LENGTH 0.000 WIC H :0. 0 : F ..,...:'' ...:-'1:"'::::::.:. `TT' HAIL ` ' A So T HANG ************************* INT ERCHANG ES OR GRADESEPATIONS _****************** • - - INT RC H-1ANGE7GRA0�� SE YPE 'N101M 111 FAL I UR . _ . C) ----- -_-__- . .. �. - _ 0.-JOU- SEPERATI DN TYPE NUA3EP. FACTOR 0.000 3 PAGE 1-16 54 NT RCHANGE/ORAOE SEPERAJION TYPE UIBER FACTOR 0.000 5 .---- _._.-._____ ---- - .. --- - .-. . • ..... .... _ -�- - --- - :6, • 7 758 ,59 R__.PN_T__�=+AT :2_1,ItiL92 AFLORIDA DEPARTMENT OF TRANSPORTATION PREVI�JUS UPDATE : 21JUL92: 16:44: 29 ES ATES OFF CE / ENGINEERING SUPPORT SERVICES- LONG ERVICES -- -- - - LOJNG RANGE ESTIMATE FISCAL YR. 1993 OUTPUT DATA OJECT MANAGER T. A .VARE - OJECT OESCSiPTION COLLINS AVE MILLING AND RESURFACING BETWEEN 63 ST W.P.I.NO.: 6113777 i 0 MMFNTS : AND 75 ST (STATIONS 16+00 TO 87+00) �, JJECT NO. TYPICAL SECTION SEQUENCE NO. EXISTING LANES PROPOSED LANES ROADWAY LENGTH 0 D 0 --- 8 060-3560 RSUCRESURFACINGDI 0 EDIAN - 01 3 3 .................______!f3___44 - 9 27 ..C.41 C_OIATF1 QUANT I TI 5S. -. ---- . ..._AVERAGES__ TEM ITEM QUANTITY UNIT COST 4 ME3ER NAME PRICE COUNTY DISTRICT STATE , COUNTY . DISTRICT 15 CO - ''.....:..:: .. . . • ' . ..:. ',, . ..: ...• - • . in :En 5I N1 _ 0 . .. . ..... ♦ 0 4 XXITEM1 10,663.000 $9.00 $95,967.00 . rr 0 1 3 TACKITM 3,469.272 $0.95 3 295.81 $0.95 $0.97 • $0 92 � � � 41 54 MI T 34.711,000 0 ......:. . . � b�4*��. .. ... :.. b `.�.:... _: . ..;, # 3.71 60 10. -. : 3 - x:11 '��:: . ........... ...............:..::.:....:.... .1 . - . . . . 29 ....... .. ................ 7- 1 2 FC ITEM 34,693.120 $0.96 $33,305.40 $0.78 $0.78 •0.96 1...- 1. al ' O 1 10 XXITEM2 14,200.000 $9.00 $127,800.00 $6.93 $6.95 $6.75 35 40 LE XXITEM3 7,890•000 • 0 2101 XXITEM554.000 ° • l... , �--_ i 3 6 1 CENTRSTR 2.688 $403.92 $1,085.74 $403.92 -408.41 $411..11 2-7 33 37 38 1 3 XX I TE M4 130.000 $75.00 $13,500.00 . . . . . 33 1 8 61 EDGESTRP 2� 8 3 + __ ; ! - : , • s « .X 6 11192.°2 f• ti ., CE ,5 6 ., ,9 ea • 51 ,3 PAGE 2-16 54 5 59 RRE`JT- D _STATE (IF FLORIDADPpART� OF T Q�NS OR ATIUN ---- — PR 1/ '"JUS UPDATE: 21JUL92: 16:44: Z9 ESTIMATES OFFICE J ENGINEERING SUPPORTIC LONG RANGE ESTIMATE FISCAL YR. 1993 OUTPUT DATA OJECT MANAGER : T. ALVAREZ T OJECT DESCR IP TION : COLL INS AVE MILLING AND RESURFACING BETWEEN 63 ST W.P.I.NO.: 6113777 MME NT S : ANT. 75 ST (STATIONS 16+00 TO 87+00) CO fi s I1JECT NO. TYPICAL SECTION SEQUENCE NO. EXISTING LANES PROPOSED LANES ROADWAY LENGTH 6 7 8 060-3560 RS i(R S RFACING UNDIVIDED MED IA 0I. 9 �.•��iY .�.fi YM►Wr�( � .. �� iMAViJY/iY•YMfMlM rFMAIIr���� � i- 57 00 S `CTI-ANO*01 s 11 DRAINAGE COSTS = $26,880.00 (SECTION NO. 01. ) :11 16 • 17-, , 95ECTION 01 TOTALROADWAY ITEMS . 9 3•49 20 22 SECTION NO. 01 TOTAL BRIDGE COSTS = $0.00 24 : • •• 25 26 MAINTENANCE OF F . TSA C 27 • 28 MOBILIZATION $65,9874.18 i 30 31 • 32 ...... ............... ..... 33 TOTAL COST OF SECTION NO. 01 /25i/359403 36 37 38 39 • 40 41 45 46 47 48 X49 50 51 53 PAGE 3-16 • S 59 -?RENTDATE :21JLJL92 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION PREVIOUS UPDATE: 21JUL92: 16:45: 59 ESTIMATES OFFICE 7 ENGINEERING SUPPORT SERVIC`S LUNG RANGE ESTIMATT=;TNIP T--STA-- - -_ - --_ (SCREEN **6 . . ►' **. ' N ** PRO ECT DATA ** PREVIOUS TOTAL= $36 504.24 (SCREEN 1) I GATE: -..21..10192.:16:45:59 P1 :OJ. MANAG R: T. VA EZ'. MILES 0..170 F `S� YR. 1993 R3 . PROJECT NO.: 87060- 3560 TYPICAL SECTION: R•S 5EQ NUM BER .0.2 WPI NO. 411377 7 i.. MI 1- - - ______.__.__ • r- • Ft Y ‘ - i - 1 R MEDIAN ' U -- EXISTING LANES: 3 R W LEFT: 0.000 R/W RIGRT: 0.000 - - --- -- - PROJECT DESCRIPTION: ABBOTT AVE. (STATION 54+00 TO 63+00) TO 69 ST INT. 4 Li COMMENTS : 4-1 0 ***************************** :.FAC � �, *: ****. ** �* ** *** AC T�.R�E AT�f� R ;- � � �������� �� ��** ���*��� MOBILIZATION 10400 MA INT TR:AFF IC .-:•::::::: 10.00-0 DRAINAGE 1.0.0 $ORRJW ITEM 120 ,1. LN/A_" - A j .i- Chi • i. I str 12 ********************************* SHOULDER DATA ************ • ******** . ***** . * * . SI TOT WIDTH LT 0.000 TOT WIDTH RT 0.000 14 PAVE WIDTH LT 0.000 PAVE WIDTH RT 0.000 15 -__ ?ASF_,.ITEM... BASE THICK 0.000 16 SURF ITEM -... -- 7.7 SURF THICK 0•000 _ 17 CURB ITEM1,1 - � U. .�..�..�� . : UR > ���T� �T :. _0��}0d CURS WIDTH-RT fl` x.00 . �! S 0 -:WI DT T0:?.5.50- - �. : slit). WIDTH RT 0. 00 S -W ITEM NO. N/ $/ WIDT 0 010 S W WIDTH RT 0.000 (SCREEN 2) *************** U*** ******** ROADWAY DATA ******** . . ** . . ******* (SCREEN Z1 RD WIDTH LT 19.500 RD WIDTH RT 19.500 IN STAB ITEM N/A __ LEVEL ITEM 333 2 9 LEVEL THK 0.000 ril .... - - --- ------..-... .... I?'I _I TEM I .... 1. 9 - --- - TACK ITEM 300 1 3 , E E ITEM -. . ..SURE T�I FIC ITE 337 : .._ � ,. ..000 m / N i 2 .. LAR � E .A Y RE S _ _ .. -;; ;-. �i Y C -. -. W .:.W��T 1,-' . 14 l H LI, . : : T RT ,�04 W/BASE ITEM __N/A W T ICAC �__ 0.000 Ej EDGE STRIPE I ---- CENTER STRIPE 1 IN ********************************** MEDIAN DATA ********************************* EM MED...WID- H .- ._ -..... 0.,0.00 .....MED.. SOD. LT ... 0.000 MED SOU RT 0.000 gi URS ITEM _......,t /A M -CURB LT 0.004 L. SHLO WIDT U0 RM SHAD• WIDTH 0.000 ***************** *** - SIGNING - LIGHTING • ********************* - 0 - LIGHTING COST-LS 0.000 • 36 �T�h�NG CAST PPR ��;l.F 1000: - 00 (SCREEN 3) ************************ X-ITEM / EX-ITEM NUMBERS ******************************* (SCREEN 3) 37 X-ITEM 32.7 70 5 X-QTY 3900.000 X-ITEM X-QTY 0.000 m X-ITEM X-QTY 0.000 X-ITEM X- TY 0.000 CI X-I_TE M. - -X-QTY_ 000, . T .X-ITEM . X--QTY 0.000 40 E ITEM .:110 4 E -Q: Y' . 1595.004 7FX--.UNIT PRICE 9;000 *-ITEM 520 1 10 EX-QTY :. 1795.000- EX-UNIT PRICE • 9.000. E:X--ITEM 522 I EX-i'QT l ::. 997.000 EXE-UNIT PRICE 15.000 EX--ITF.M -- - 66t) 2101 FXV -QT ' 34.000 EX-UNIT-PRICE _ - 350.000 EX-ITEM EX-QTY 0.000 EX-UNIT PRICE 0.000 na *********************************** 3RIDGES ************************************ II TYPE NUMBER LENGTH 0.000 WIDTH 0.000 FACTOR 0.000 TYPI N(JMIjFR .. l ENGT. 0.000 WIDTH 0.00 0.00 ,: TYPE `•i U!'4 P E R Q _ ACTOR _------------ 0 __ - N _...T 0 Gtr 0 00 R0-.003TYPE - �..E � , , . :. . �3 ��0 T#~� Q ATO � NUMBER ' LENGTH 0.000 WIDTH . 0.000. FACTOR 0.000 m TYPE NUMBER .:LENGTH ,0.000 WIDTH 0.000 _FACTOR 0,000 ***********************-** INTERCHANGES OR GRADE SEPERATIONS **:**************** : INTERCHANGE/GRADE SEPERATION TYPE NU�1BER F _ _ -- ACTOR; 0.000- -- _�- INTERCHAN;E/GRADE- SEPERATION TYPE 'DUMBER FACTOR 0.000 INTERCHAwGF/GRAD?E SEPERATION TYPE NUMBER FACTOR 3.000 PAGE 4-16 oa , SI SA .ti `.9 f- RR. E N T- _DAT :211_111_9_2_-----_- ------------- _T E C1 F FLORIDA D E P A T M E N E RA S P O RZ T A T I O N U P;)ATE: 21 J U L 9 2: 1 6: 4 5: 5 9 -- ] -- ESTIMATES OFFICE / ENGINEERING-- S RT SERVICES _ _..- _ _ PREVIOUS-------- --------------- ----- - --- LONG RANGE ESTIMATE FISCAL YR. 1993 OUTPUT DATA O J E C T MANAGER : T. :AL VA R E ._-••-_ -____...---- - _ i OJECT�DESCRIPTTON : ABBOTT AVE. (STATION 54+00 TO' 63+00) TO 69 ST INT. W.P.I.NO. : 6113777 MMEhTS Cs _ 7-4' OJECT NO. TYPICAL SECTION SEQUENCE NO. EXISTING LANES PROPOSED LANES ROADWAYLENGTH _ D 6 RSU(RESURE4CING . U IVIG: D E: IA I • • • -- :-.-- 060-3560 rr}} . . . . ' . ---T . : .... ..... .. . . :. -. .: . . . . :.:. HT TEM ITEM QUANTITY UNIT COST if 'OBER NAME PRICE COUNTY DISTRICT STATE COUNTY ;s' DISTRICT -..+....,.v—..�-............ - -•------ :i.u:::.r:ris:ait+,;:a+aw+.+++war.+tia .. cif►aMsiii...r++r..K,••r ..rr• .*.*. .. . . 14,PQ0 $2 . ..-..0.0 H. .'.....: : ........:s.i.c.::---:-- •. . ' ..' ::..--1:.-:- . • e .-.., - :-.::- ':. - ..::1-:-:!!‘..:-...:::...-H: ,-I-.' -:-- - . i139- 3 4 XXITEM1 1,595.000 $9.00 $14,355.00 3 1 3 TACKITM 388.955 $0.95 $369.51 t $0.95 $0.97 $0.9,2 41 54 ?? �} 5 ..)CITEM1 - .:-. :-...3.- 90.0.«900..-: .. ::::-.:.:H:.::...::::-....-......:::::.. 4.0.:*7.'E:.li:!:.1::::::-1.,:t§..1..F.::::!:....h!:]...4gi7:4,......:99. :..::: --:::::::.....'.:::::',,...:.:...:- �r. 2a 1:::: 1 .1...'......... .-.. ... .$0.7:1 - . S-P---.---6Z :- .:: . . .:... ..:::::.. . ...:-:- ......:::- ..:-.::'..::-...i.. . . - :., ...-...: .:.:z..--:::25 IT .3411894600 • l 1 2 ECITEM 3,889.600 $0.96 $3,734.02 $0.78 $0.78 X0.96 ... . : .1... _ _ 1 29 . )- 1 10 XXITEM2 1 ,795.000 $9.00 $16,155.00 $6.93 - $6.95 $6,75 35 40 -- XX _M3 997.000 $15.0 ••":$14: 955.00 $1 . x.13 ;351 2101 XXITEM4 E 4.000 i • $350.00 --::: $1.I.,990.90 i -.::. • • • :. 4 . * . • - • .E:.:::::. -•*. • 4. - 0 . . o . --:.... . .:.:, . . .. II -. . ',,u. 1 1 CENTRSTR 0.340 $403.92 $137.33 1 $403.92 $408.41 431.11 733 ,37 37 L 8 61 EDGESTRP 0.340 $1,593.34 $541.74 $1 ,593.34 $1,609.06 $1,192.02 7 838 39 , ,,I___H-7 43 44 45 46 47 - 48 50 --_ — - 51 53 PAGE 5-16 54 5 • - — 6 � 5 7 58 5� ?RE;41- DA_TL_ =._��.l��JLS2 ___-- ESTATME TOFS FLORIDA D PARTME �! OF TRANSPORTATION PREVIOUS UPDATE: 21JUL92: 16:45: 59 59 - - -- --� LONG RANGE ESTIMATE FISCAL YR. 1993 IJ!JTF:JT DATA JJECT MANAGER : T. ALVAREZ - - - - - - - ----- ECT DESCRIPTION = ASDtTT AVE.. (STATION 54+00:170 . 63+00) TO 69 ST INT. W.P.I.NO.: 6113777 1MEAlT5 2 )JECT Nn. 5 TYPICAL SECTION SEQUENCE NO. EXISTING LANES PROPOSED LANES ROADWAY LENGTH • `6 }6 0-356O RSU(RFSU)RFACING UNDIVIDED ME IA 02 3 3 04unTAE-73P-11.E.t7,0EXR-TTriziS.""3.7-7-7..-""-•"7.7.-""*.::H.:,-7.:".": -7, 777.7—f. - S'ErTT731q-NZ)-;-12;i7.777-7"...7.77:77:77777.77777:777::' 10 /RAINAGE COSTS = $3,400.00 (SECTION NO. 02.) a is 17 FCTI N 02 TOTAL ., ROADWAY ,ECTION NO. 02 TOTAL BRIDGE COSTS = ”3i1.4*•10 — ?2 . 0.40 za. 24A I T , . �A�tC ... .......... .....: .:............. t _ _ • 27 �O B I L LAT I O�� -----..---- z 36 _ 31 OTAL C • OST �� SACT ,- • • 33 I�N �Qw 37 38 39 - -;CT 41 • 4 44 45 46 47 - ----- - 48 49 50 51 • 53 PAGE '6-16 s4 - -- - 57 59 .kE.-Nr__ i.ATI__:,?1_.11.11.3 TE O_F FLORIDA D PAR P. NT JF TRANSP33RTATION °REVIOUS UPDATE: 16JUL92: 03: 27:56ESTIMATES OFFICE ENGINEERIrG SUPPORT SERVICES LONG MANGE _STIMAIE� -INPUT DATA _ � * PROJECT O1aTA **. . .PB'"\/IOUS TOTAL= - - $8:11504.24 (SCREEN 1) ALVAREZ . MILES 81170 FIS/YR. 1993 i��DATE* i,6JUi,.9 ;082�' 56 PROJ �tAa'�!#�Ef�: . 0. !f r PROJECT NO.: 87O6Q-3..56. ...' YPICAL SECTION .. .RSU SEES NUMBE t: WPI NO. 6113777 - EI PROJECT k ' R MEDIAN: ij �'- • 0 EXISTING LANES: 3 R/W LEFT: 0.000 R/W RIGHT: 0.000 Q PROJECT DESCRIPTION: ABBOTT AVE FROM 69 ST. TO 71 ST. (STATION 63+00 TO 'I D COMMENTS STATION 72+00) 0 FA T :./EwARTHWOg *****t**** *********...*******.**** -- OBILI MOBILIZATION 10.000 MAINT TRAFFIC 10.000 DRAINAGE0 1.000 BORROW ITEM _ 120 2 2 CL t GR ITEM ---N/ .L.,...r- . k I. - > k 4: 440 1 . ` 0.000 *************** • *** • ******** SHOULDER DATA ****************� * . ***�****�k* -ii rm TOT WIDTH LT 0.000 TOT WIDTH RT 0.000 14 PAVE WIDTH LT 0.000 PAVE WIDTH RT 0.000 - '15 BASF ITE:! BASE THICK - 0.000 t6 SURF EM SURF 0.00 -- 17CUR E NO. ........... lA �. t1 4�ITT 0.000 CUWIDTH RT .Q0t1 o0 D .�: LT f:: S0€� WIDTH RI 0.00q M N S/W WIDTH LT -0.000*_____VM: WIDTH RT 0.000 (SCREEN 2) ********************************* ROADWAY DATA ********************************** R WIDTH (SCK��N `� D LT 19.500 RD WIDTH RT 19.500 gl STAB ITEM __ N/A LEVEL ITEM 333 2 9 LEVEL THK 0.000 Pi 300 3 BASE ITE: N A .. 1 : :; :... :: BASEK 0.40 $ • , .: SURF ITE 1 . :. .; SURF THICK . . • -,::::..:..:::::: .::4:::,:L.. .- .• ::.....H::: . m mE/C I TES 337 1 2. OfIY iiAY/REQ . . ..p. 00 I eW1 fcDM 0.0.0W/WIDTH `L . 0,flf. U/WIDTH RT • 0.000 W/BASE ITEM __N/A____ W/THICK 0.000 EDGE STRIPE 1 CENTER STRIPE 1 �7 ********************************** MEDIAN DATA ********************************* iii - MED. .WLDTH..._- .. ... .... ..... .. ..0.-Q,40 ..... E. QO L.T 0.000 MED SOD RT 0.000 El M/CURB B ITEM ___N/A_� E �:. R8 LT 0.000 MED CURS-RI 0.000 ____-- L. � .SN10 WIDTH 033 MLt� IDT# ±Q.4U0 ......... SIG I I ******** ** .::!il.'::''.;•'::::::;:.:1:::i.:: :-:.-'..:::Ii::t...:...::::•:..:1:2::::;J:ill,..11:1';':i.,:::!!::.d.:::i'::.:::1.:•:::::::.':.f.',1'::::.:t;:::::::.:.-'1:;.ii... 111 S,IGNI-NG- COST PER MIFF 15000.000 LIGHTING COST LS 0� `000 :.... . :. • (SCREEN 3) ************************ X-ITEM / EX-ITEM NUMBERS ******************************* _ 36 X-ITEM X-ITEM �} 37 327 70 5 X-QTY 3900.000 X-ITEM X-QTY 0.000 m X-ITEM X-,TTY 0.000 X-ITEM X-QTY 0.000 X-ITEM X.-4TY 0.000. . .. X--ITEM __ X-QTY - - 0.000 -- : I...-ITEM ,10 4 EX-'-QTY .1 95.000 EX-U IT PRICE 9.00 - EX-ITEM 520 • 1 •_ 10 EX--QTY 1795.00 EX-UNIT PRICE 9.000 UM .E X-ITEM X22 1 :. ,.,.EX-QTY ` . 997.000 EX-UNIT PRICE 15.000 •... c,, '"" 0.0U EX-UNIT PRICE 0.000 an . P ., EX-ITEM EX-QTY 0.000 EX-UNIT Rich o.QOo *********************************** BRIDGES ************************************ RI TYPE NUMBER LENGTH 0.000 WIDTH 0.000 FACTOR 0.000 TYP-E _ NUMBER LENGTH 0.000 WIDTH _0.000 FACTOR _ 0.000 TYPE NUMBER LENGTH 0.000 WIDTH 0.000 -FACTOR x:000 -- ---_- TYPE .NUMB �# 23 LENGTH.::..,..: ::, .::. 0.000 �L#�TH 0.000 FACTOR 0.000 TYPE NUMBER LENGTH .. 0.000 WIDTH,. 0.0000.00323 FACTOR ******* * *** ***# * INTERCHANGES OR GRADE SEPERATIONS *****************�a I1 INTERCHANGE/GRADE SEPERATION TYPE NUMBER �7�I:T7R---- - 0.0-DO --_ INTERCHANGE/GRADE SEPERATION TYPE NUMBER FACTOR 0.000 _ 30 INTERCHANGE/GRADE SEPERATION TYPE NUM3ER FACTOR 0.000 PAGE 7 16 ao 1i au J`9 RR c NT_LA __;2.1JUE92 _ _STATE OF FLORIDA DEPARTMF�'NT OF TRANSPURTAT IGtti PREVIOUS UPDATE: 16JUL92:OB:27: 56 ESTIMATES OFFICE / ENGINEERING SUPPOk Sc S- --- LONG RANGE ESTIMATE FISCAL YR. 1993 ' OUTPUT DATA OJECT MANAGER 8. ALVAREZ ,.. -- - - 1 OJECT DESCRIPTION . ABBOTT AVE FROM 69 ST. TO 7I. ST. (STATION 63+00 TO W.P.I. 6113777 2 NO.: MMENTS : STATION 72+003 1— -- -- _ Wit 4 5JJECT NO. TYPICAL SECTION SEQUENCE NO. EXISTING LANES PROPOSED LANES ROADWAY LENGTH 6 060W-3560 RSU(RESURFAC.ING UNDIVIDED MEDIAN 03 3 f 9 ......,i......awn+.....«+w ww�.......++.+w►wr+w,r——...�.r--•�..•� 1.r..�rr++ar.rrw►wa .wr+rw�r.w+w►w«.►«rM«+�w►wr«+++«►.�w«-.r.�.r.. �. 1 .rr...rad+r:aww►1w►.arwaw►w«wa.4.10�.11*4401 44014.110114441,100, 11 -- ---— 1 .I.. LJ 1-:4TE f.-:QU.AIT T T I.FS - --..: .AVERAGES _ .- ----- _ COUNT 12 1 TEM ITEM QUANTITY UNIT COST 14 MBER NAME PRICE COUNTY DISTRICT STATE COUNTY DISTRICT ,5' _ _...._. 16 17 SIGNING 1.000 $21550.00 $27550000 19 :90 t 6------4 XXITEM1 1,595.000 $9.00 $14,355.00 • • • \ •1 0 1 3 TACKI TM 388.955 $0.95 $369.51 $0.95 $0.97 $0.92 i 41 54 22 T 70 5 X:IT ' :: - - - E �. 3 00 0 $.2:i7.49. :00.1 004 0 724 {. fl7 t3 25 8 * 2 _1.� $1.80 $ l 7 1 2 FC I TE M 31889.600 $0.96 131734.02 $0.78 $0.78 $0.96 . ::.y.. ..: 29 30 0 1 10 XXITEM2 1,795.000 $9.00 $16,155.00 $6.93 $6.95 $6.75 35 40 3i XITEM3 997.000 {3 . $I50 $��� ��► �►€�d $�� �7 $�.�.65 4 3 33 41 1 CENTRSTR 0,340 $4 .92 -137.3 $403.92 $408.41 $471•1 . <�7 33 36 1 8 61 EDGESTRP 0.340 $1,593.34 $541.74 $11593.34 111609.06 •1,192.02 37 38 39 0 •1 •2 •5• '6 .8 .9 5� 51 3 PAGE 8-16 54 5 y 7 • 58 59 - 1-JUL-32----------- STATE OF Fl f1RIt1A LiEPARTMEINIT OF TRANSPORTATION' PREVI'JUS UPDATE: 16J'JL92: 08: 27: 56 ESTIMATES OFFICE / ENGINEERING SUPPORT SERVICES --- — ___ —_--- -� LONG RANGE ESTIMATE FISCAL YR. 1993 OUTPUT DATA OJECT MANAGER 3. AL `A# E OJECT DESCRIPTION A I TAVE. FROM69 T. TO71 ST. (STATION 63+ TO P MMENTS : STATION 72+00 .I.N0.: 3�''�7 - 2 -ler 5 OJECT NC. TYPICAL SECTION SEQUENCE NO. EXISTING LANES PROPOSED LANES ROADWAY LENGTH Gig) ei 8 360-3540. # Ski(RE v 0E.0. O IA t TAT :. ,��r_�.::�.. .:.,... �� .,.., ....,,.. .. �+anvwv+.+w!��..��++ur.a+r�rrw+�►+u+wr.M►wr+ww a,.►• 0 ; ,P w� 1.� �4 �j'�' IRA IMAGE COSTS = $39400•00 00.00 (SECTIJ(4 NO. 03. 1 14 15 -- — — 16 EST € :{ 3 TOTAL. OA .� � � �T� S 1 7� 4�1 a � .1O 91 )ECTION NO. 03 TOTAL BRIDGE COSTS = $0.00 22 24 ................... 1AI . .......:... TE - F ,;. 26 27 IOBILIZATION _ $7,864.02 �. �. �- - �.� 29 29 30 31 32 -OT AL COST OF SECTION NO... 0 _ 33 $861504.24 34 4,, .1 42 ga OS P5� 51 3 • 4 • 5 4 w, ��1_L_ AT =X1,,1�,1 �2 _ STATE OF FLORILA DEPARTMENT OF TRANSPORTATION PREVIOUS UPDATE: 21JUL92: 16:47: 25 STI.1ATES OFFICE 1 ENG ItJEERING Ji POP.T SERVICES LONG RANGE- STIRA-TF4- -INPUT I A-T ----- - -- _ (SLRFI N 1) **DIST fiLOrK N ** E- ** PROJECT DATA ** PREVIOUS0 T TAL-- $110L707.89 (SCREEN 1) INOATE: 21JU192 16:47 5 PRO MANAGER: 8. ALVAREZ MI ,ES 0 2 4+ EIS! O. 8 Yet. 1993 2 PROJECT O 87060-3560 TYPE AL SECTION RSU SEQ NUMBER: 04 WPI Na. 6113777 3 -tL. PRD S;D LANG: 3 L CATION: R MEDIA is U 4 EXISTING LANES: 3 Rl LEFT: 0.000 R/W RIGHT: __� PROJECT DESCRIPTION: -IARC ING AVE (STATION 72+00 TO 67+00 FROM 71 ST. TO 0.000 s COMMENTS : 75 ST. ) 6 ****************************** FACTOR/ EA THWORK ************4** ***** 7*4c*4* 8 MOBILIZATION . 10.000 MAINT TRAFFIC 10.000 DRAINAGE 1.00tJ BORROW ITEM 120 2 EMBANK 2 CL K_ ITEm - :P , ! • # _ , ` T Fl o oo 0. .. .. ... z . . / l****{*****y*** *** • ******** SHouLorR DATA ******** • * � * . - TOT WIDTH LT 0.000 TOT WIDTH1 RT 0.000 14 PAVE WIDTH LT 0.000 PAVE WIDTH RT 0.000 i-5-- BASE .-ITL,"'1. _...- P'ASE THICK 0.000 CUSURF ITEM SURF THICK ----- 0.(3i� 18 .. ITEM NO. .T.__N/A- CURB WIDTH LT 0.000 CURS WIDTH RT 0.000 18 S 0 WIDTH LT 0;15-60 ,:: . SOD WIDTH 11411: 2 (�f� ,� 0.000S W WIDTH 0.00 . (SCREEN 2) *************** *** • • ******** ROADWA DATA **** • * * ***** • ** ** . * * •1 RD WIDTH LT 27.000 •1 STAB ITEM _ _�'U/A _ _ LEVEL ITEM 333 2 9 LEVEL WIDTH 0TH RT 27.000 22 THK 0.000 • . FMUL T TEM 100 I -9 A K ITEM 300 1 3 BASE ITEM N/A 25 ITEMSURF -311 T1 - THICK ,2.000 _ 2s ift ITEM 26 337 I ...,.,.,..,.. _�����: �;, � .3YE�tAY/CUM _. 0.000 :. -FW/WIDTH _ 1 H LT 0.000 ;, � WI�1TH RT _ I.i3t10 27 • w/EASE ITEM ---_N/A____ WITNICK 0.�0$ ---� .. . _ 28 EDGE STRIDE 1 .-...-.. 29 CENTER STRIPE 1 30 ********************************** MEDIAN DATA ********************************* ME s W R F 0.000 MED SOD LT 0.000 MED SOD RT _ 0.000 32 31 � °... I * : 0.000 MED CURB RT - -0.000 -' ,,' SHLOIL `' . 0; 033 r RM �h�D W I DTH 0.000 SIGNI G - LIGHT **** * 34 ► NG. COST PER MILE 15000•00Q LIGHTING COST LS 0.000 (SCREEN 3 ************************ X-ITEM EX ITE' NUM3ER� ******** * # * * ********* * (SCR36 EN'327 70 5 X-QTY 6241.000 X-ITEC! X- TY tSC E N 3) 37 38 0.000 X--ITEM X--QTY 0.000 X-ITEM X--QTY 0.000 - Ar 0 __ -m - -4- EX-QTY 1849.0 -FX liNIT PRICE 39 X-ITEM X-QTY 0.000 4X- YX- M1.EX-ITEM 520 110 EX-QTY3000.000 EX-UNIT PRICE 9.00042 522EQTY 1667.000 EX UNIT PRICE 15.000 •3R NIT PRICE 0.000 ,4tX-ITEM EX-QTY 0.000 EX-UNIT PRICE 0.000 Y *********************************** BRIDGES ************************************ 's TYPE NLNTER LENGTH 0.000 WIDTH 0.000 FACTOR 0.000 '6 TYPE NUMBER _LENGTH 0.000 WIDTH 0.000 -- FACTOR 0.000 ,7 TYPE NUMBER LENGTH 0..000 WIDTH- 0.000 FACTOR - 0.000 .8 TYPE NUMBER LENGTH -9 0.000 WIDTH �.00 fl FACTOR ,�0.000 59 E _ NUPE ER LENGTH 0.000 WIDTH - 0.000 FACTOR 0.000 � 51TY**P********************** INTERCHANGES OR GRADE SEPERATIONS *** ******* ***** � 3INIERCHANGE7GRADE JPFRATION --TYPE N ER FA-CTDR- �_ U.000INTERCHANGE/GRADE SEPERATIQN TYPE NUMBEP FACTOR 0.000 INTERCHANGE/GRADE SE PERAT I ON TYPE NUMBER FACTOR 0.000 PAGE 10-16 s4 . - s _-��__ -- _. __----- - - --- - - 56 59 iv,I.:;:If__k -21JuL9 - STATE OF FLORIDA DEPARTMENTOF TRANSPORTAT ION R r - �_ ��� P' EVIOUS- UN,�ATE. Z1J.1L9Z- 16-47. Z5 ESTIMATES OF TC / ENGIN7cRIP.IG SUPPORT SER RANGE ESTIMATE FISCAL YR. 1993 1 _ A OUTPUT DATA C p NA6ER : 8. ALVARE; J OJECT E CRY OiA i AVS• (STATION 7 +00 TO 87+00 FOM 7 ST113777 : T2 MMENTS• 75 ST.) OJECT NO. 4 TYPICAL SECTION SEQUE�JCF NO. EXISTING - TI'VG LANES PROPOSED LANES ROADWAY LENGTH �,,,l 6 060-3560 SU(r�gSUR�.�C��#� u�'�ior�1'.�o £� MED,IAN _ 8 4 ..:, i i .� - .. ..... .. .. .... -. .. .. .. Tom. .... Y.ub,�il.iM�--------'-'7-.-- 77"'"""7--".---7"--7------77777:'-'..:.:.' ... ..i,...::„..•.H:.:-..3 :7-77.7.7.7.77.7;i7.40..4 �.4. . .... arr.�r w++++w�►,«►+w�r++.wr►.ww�w -.rra�r� iiiii\1*-H:H. ' :... ''' '..::.-.. :••:'.i.:.•:•-•-:•••.,.-•::•':- 71 a�waw � Q •i VEcAGES TEM ITEM QUANTITY UNIT COST MBER NAME PRICE COUNTY DISTRICT4 __ .. -- -.. ..Y.......... .. ... STATE COUNTY DISTRICT 17 0 ,, �� INS _. Q . 2 4 • 4 XXITEMI 1,349.000 $9.00 $16 6240Q1.*.0Q00 z 0 1) 3 TACKITM 899.701 $0.95 $854.72 $0.95 z2 7 _ .._ � $0.92 41 54 � 7 , . p ,T. :,,,.-, z4 :7 : • ?87 $ 73 � �.S fI li-: 7 1 2 FCITEM 8,997.120 $0.96 $8,637.24 _ z$ t $0:7a � 0.78 0.96 29 1 10 XXITEM2 3,000.000 $9.00 $27,000.00 $6.93 3 . $6.95 $6.75 35 40 $25,00,0f)... $ 3.3-7 2 33 $ 03..92 229 8 61 EDGESTRP 0.568 3 ;3 . . . ,Lt65, $1 593.34 t- $905.02 $1, 593.34 1,609.46 I $1,192.02 7 1/4' 37 38 — 39 - 4fl 'H. 41 42 43 45 46 47 48 —� 49 50 51 52 53 PAGE 11-16 54 55 56 57 58 • '6 S f- z S - is GS 60 90 Lb 9b Sb VP Eb Zb lb - EE _ 9E LE 9E4 EE S -- 0 '0N N ttS4� r` I .Rk J . ZE lE OE 6Z ez -7: -.._- LS'LQ+76£T = 18 0 :::<.:: �, 9Z b Z 00.0$ = S1SO0 3 9012 1V1O1 +iO • ON NOI103SZZ 8l V �n3.I ip35 91 a`t ( •+so .ON NOI103S) 00'0R9115$ f . z� 1SOD 30NIVbU II a E c ( NVIO3W f 0I IOifl ONIDV f S )f15 U9 E 0903 L 91.11, H10N31 AVMOVCb SENV] 03SOd02�d S3NV1 ONIISIX3 ••0N 30N3(1b3S S Q� NO1133S ld�I dAl b ,,./ 'aN 1�3�0 , _____ „__ , _______ ...._. _4_ E z �.LL Z9 :"0 •i' • r (*is L `: S1N3W�► 01 ..S I L WOliA 00+L8 OL 00+ZL NOIIVIS) 3A V 9N I O2iVN = NO I1 d i blS30 10. 3r0 . --; 7311VA1V '9 : d3OyNvw 133rO vivo lfldl(lU £661 • A 1VDSI3 31V611S3 3ONVd ONL1 -- --_S3lTA S____LEEdOS SWIAq 1ON3 / 3D13 S31VWIISD S Z :L :9T :Z6lOf Z :311 (]dn SPC I A. d N0I iV1 C'dSN.t� j1~30 N31n' � - 4 -- ---- _ 1 ldt d3G dQIdC��:� 3U 31t�1S -- - -ZE��f1rTt: ��1dU 1N18U; RRE;, __LATE__-21JUL92 �, STATE OF FLORIDA DEPARTMENT OF TRANSPO, PREVIOUS ► : : 6: : RTAT ION UPDATE: Z1JtJL92 1 4d 34 ESTIMATES OFF ICE / ENGINEERING. ST PUP 1 SERVICES -LONG RANGE- 1 I61f --I PUT--�A.rte- ------ - -- -- ----- _______ CQEEN 1) **DIST BLOCK N **REVIEW N ** PROJECT DATA ** PREVIOUS TOTAL= $309 353.82 (SCREEN 1) INOATE: 21JUL92:16:48 34 PROJI. MANAGER: T. ALVAREZ MILES 0.530 SIS/YR 99 PROJECT NO.: 87060-3560 � �. � l 3 A T1F��C��. SECTION: RSI SEQ NUMBER: 05' WPI NO. 6113777 i- ll PROPOSED LANES: -A CATION: R MEDIAN: U .., EXISTING LANES: 4 R/W LEFT: 0..000 R/W RIGHT: 0.000 -- --- 0 PROJECT DESCRIPTION: 71 ST FROM COLLINS AVE TO BAY DRIVEGO COMMENTS : "el p la i FACTOR/EARTHWORK *#************* ************-***** MOBILIZATION 10.000 MAIN` TRAFFIC 10.000 DRAINAGE . 1.000 9 BORROW ITEM 120 2` 2 CL E GP, ITEM ,..�.........'�/A ,.•. CC ��+K I TFM �_fl1 REI ...PIT AC. - U.. MSA«. ID 0 RET .PIT_EA_ .: � _ 0.000 _ *****************Tc******T******** SHQUL�7FR DATA ********************************* TOT WIDTH LT 0.000 TOT WIDTH RT 0.000 14 14 AVE WIDTH LT 0.000 PAVE WIDTH RT 0.000 is RASA--_ITEM _. BASE THICK 0.000 CURS SURF I TEM NO. T SURF THICK160.000 B ITEM _ N/A CURB WIDTH. LT 0.000 CURS :IDTH RT 0.000 17El SOD WIDTH LT ClaZO SOO I DTH RT 0.00 0 M (SCREEN 2) ****************T************************ W WIDTH RT . 0.000 • ROADb+�AY DATA ****#��#**#_ Shi WIDTH LT 0.000 ���*��#�* REEN o RD WIDTH LT 30.000 RD WIDTH RT 30.000 STAB ITEM __ N/A __ LEVEL ITEM 333 2 9 LEVEL THK 0.000rfi PSI EM.UL. ITEM 3U0 I TACK ITEM 300 1 3 BASE ITEM _ NIA - BASETHICK 0.000 ..� SURF ITEM 111 72O 000 , FiC ITEM 337 1 _ 2 DRIVEWAY/RES. DRIVEWAY/COM• m f � _0.000 0.000 W/WICTH LT 0.000 WI IDTH:. R ' 0.000 W/BASE ITEM T- - 10 W/THICK 0. 10 ` EDGE STRIPE T 0 � _ _- • ******** =************************* MEDIAN DATA ********************************* 0.000 MED SOD LT 0.000 MED SOD RT 0.000 M CURB ITEM LM --- A MED CURB LT 0.000 -- --- iii RM SHLD WIDTH 0.000 ni SIGNING - IGHTI r **** ** .QST PER SIL E _ 15Do0�000 LIGHTING COST LS 0.000 __--. SCFE * **** � ( _N 3) ************* X-ITEM / EX-ITEM NUMBERS ******************************* (SCP c'--'T 3) ----- X-ITEM 327 70 5 X-QTY 18656.000 X--ITEM X-QTY 0.000 X-ITEM X-QTY 0.000 X-ITEM X-QTY 0.000 X ITFM X-QTY... 0.R. U X- T M X-QTY _ _0,000 CO EX-ITEM 110 EX-QTY 49 5.000 EX-UNIT PRICE 9-.00I3 Ex-IT520 .1 10 EX--QTY 5597.000 EX-UNIT PRIC9.000 CO EX-ITEM 522 1 EX-QTY 3109 C�00 EX UNIT PRICE 15000 X I T M h31 $ 0 2 101 FX-QTY 24.000 EX-UNIT PRICE 350.000 EX-ITEM EX-QTY MI Q 0.000 EX-UNIT PRICE 0.000 nil -- *********************************** BRIDGES ************************************ TYPE NUMBER LENGTH 0.000 WIDTH 0.000 FACTOR 0.000 TYPE -- NUMBER LENGTH 0.000 WIDTH 0.000 FACTOR_ 0.000 TYPE NUBER LENGTH 0.000 WIDTH 0.000 - --- _-- _-- . TYPENUMBERLENGTH 0.000 WI DTH -TAMA U� ��-x.00(} ---- -..� - � TYPE L�. 0.900 FAC OR 0.000 NUMBER LENGTH 0.000 WIDTH 0.000 FACTOR R **************-*********** INTERCHANGES OR GRADE SEPERATIONS ************* ,0.000li ** il INTERCHAOGEJGRADE EPERATT T -TYP , - _ �� - - ��� SER. � o.�-o�. INTERCHANGE/GRADE SEPERATIDN TYPE NUMBER FACTOR 0.000 _____PAGE INTERCHANGE/GRACE SEPERATIth TYPE NUMBER FACTOR 0.000 PAGE 13-16 55 • - _ - - .61 58 'FA''`'T_ LAT` _: -1,JLL 92 ---- - — — 34 _STAT': i.OF- FLU'UOA LPART'�IENT OF rR,AISPo CATION PU VI;1US UPDATE: : 9 ' .� 9 . ESTIMATES OFFICE - ----,_---2 — - - �,���r E�I��'� �ll P��1` ��STI�:�, .- , ------- LCNC RANGE ESTIMATE FISCAL YR. 1993 _ fUJTPU I DATA IJECT MANAGER • T. ALVAREZ - . . _. I ')JECT DESCRIPTION71 'ST FRU COLLINSC3LLNS AVE TO A DRIVE W.P.I.N0. • 6113777 fIMENTS NP. TYPICAL SECTION SEQUENCE NO. EXISTINGLANESCD _ PROPOSEC LANESQ7AC�rIAY LENGTH �,,, 11- )JUCT )60-3560 RSU(RESUAFACING UNDIVIDED MEDIAN 0 0 4 4 0.53i7 .` _______________ r.►rM.My►MMr►-1yw--____T-----w-- CALCUL `E. ._d t MI - - - w - 4 COUNT li FM ITEM QUANTITY UNIT COSTSI 14 BER NAME PRICE COUNTY DISTRICT STATE COUNTY DISTRICT ,s i+iit+.sraraamss ara as.sa.is .sr+awaais:w swQitiaii+ai aia:ws— —w+—r.► v.sy+v+w++w_+ ...... _ ..r..r / - —__ 16 7 SIGNING 1.000 $7,950•00 $7,950.00 • • 4. • • g � 4 _ --- XX I TEM1 4,975.000 $9.00 $44,775.00 • • _ ,U VI 1 3 TACKITM 1 ,865.578 X0.95 $1,772.30 $0.95 $0.97 $0•92FS 41' 70 5 �I � ... .... - _ 54 � T .M� 14,656.000 $0.71 $13,245.76 $0•71 $0..71 $0.60 5 5 m 72 10 SUR ITEM 18,656.000 $1•61 $601 072 32 $ m 1 2 FCITEM 19,656.000 10.96 $17,909.76 $0.78 $0.78ID .7f3 X0.96 1 .. . 1 1 0 XX I TE M2 5,597.000 $9.00 $50,373.00 $6.93 - $6.95 $6.75 35 40 F31 1 XXITEM3 3,109,0000 $35.£1 $4633 ,�►35.00 ; $13 3 $13.6TT 114.13 3 38 33 2101 XXITE24, u0 $ 5 . 0 $$,400.00 • I • + ia f r 1 CENTRSTR 1.590 t403.92 *642.23 $403.92 408 1 1.6 I .4 $4 31.11 �'T 3 ., R 61 EDGESTRP 1.060 $1,593.34 $1,688.94 $1, 593.34 $1,609.06 $1 192 02 39 7 39 211. CB ,3 ,5 121 --------- ------ ,:3 PAGE 14-16 54' __ _______ __ i m • 5a ... . . RRENT___DATE :21JULY2 3 I A I F LIF_.1-IL3R 1 r Al2.E.P A R T21...-L4TLiF_ .12,-V%S k n P.T 1 T I ON P4EVIO UPDATF : _ 21_JUL92 : 16:48: 34 hSTIMATES OFFICE / ENCINCE.UNG SUPPORT SERVICFS \ LONG RANGE FSTIMATL FISCAL YR. 1 'iT3 OUTPUT DATA ) dJECT MANAGER --: Y. ---ALVARE.7.. .--- L 9JECT OESCRIPTIO4 : 71 ST FROM COLLINS AVE TO BAY DRIVE W.P. I.NO. : 6113777 0 - MMENTS : I,- i 1 _ ____ _ • ri li li rJJECT NO. TYPICAL SECTION SEQUENCE NO. EXISTING LANES PROPOSED LANES ROADWAY LENGTH li 060-3560 RSU(REURFACING UNDIVIDED MEDIAN ) 05 4 4- U.-530 - - - - 9 IE-. SI • iRAINAGE COSTS = t101600.00 (SECTION NO. 03. ) 14 is 16 17 in SECTION 05 TOTAL ROADWAY ITEMS = $264,064.31 El . . SECTION NO. 05 TOTAL IIRIrY;E COSTS = $0.00 rili la EC • MAINTENANCE OF TRAFFIC = $26/406.43 Fil MOBILIZATION = $29/047.07 33 TOTAL COST OF SECTION NO. 05 = . $319/517.82 It . M -- , — — -- 36 37 M2 39 4 - - I ,9 PAGE -------------- II • • _... 50 5' 15-16 El . - . i 58 - _,_.-T:;1-747:A . , 1 zI t- r: _ A l—r , P �'"W I J 1 J 3 c : ?1,111_92.11: : t ----0----T.4-,W S I�' �_ J- ._ r-:Z I ti. J ; 7 r F.•i It-r:�- - ..------- J F 1 r .=- �+F3' j LON 7.4^.6 STI"IA T,± FISCAL YR. 1993 fUTPU T OA T1\ 1JFCT t A\AG[P. : T. ALVAREZ--- . -. -- _----- ------ _ -- -- — - — {'1J DESCRIPTION - 71 ST FROM COLLINS AVE TO klAY DRIVE' .P. I. D. : vli3T7 -" MENT5 til --t - g. -- -5JFCT N . TYPICAL SECTION SFU_ JC[ V.I. EXISTING LANES PROPOSED LANES ROADWAY LENGTd f 5_ 0-40-3560 RSU(RESURFACING .UNDIVIDED EDIA 3 ,;kr.wa wm r Ptr,'f I CT-+- ritU= 3 x.1 r�. �t 13 , FGUL.� ? ITt MS = $11091,434.25 t44 TAAIMAGE. COSTS = ,161 -11771 $49,960.00 la . �OAr-WAY C r)STS = - ---- ��,� . 1,14114 +4.25 1_�� --_ 124 • JOB TOTAL BRIDGES, COSTS =+ --- -- ----- - - _ L Fa 12 7 1AI�lTFNA�l,f E c7 F= TRAFFIC = - --- - --- - �_� $114.1144.42 . 415ILIZATIONV = 11251558.37 . is. ... .... : _ _____________43-4, NJ litlj--- ---- ----------- 1,38 ' ? 137060 35bfl T' T L 1 147 � �5� � 1�3 3 . , 1:!21 , I . . _____ _ . ___p ri E. ------- ---- -- ---- ..2-7 .. -. . _.J PAGE 16-16 -,- __ ic.:] r t--1 1 )N()1 )() .11_)S11 r- DI 1 '-1 `\�1.II;IIIIIflllll1111iI?, all___. NOI--?TIi S I ---,... .� -I oR E Mill!! iniimilllllllllillllllillllltiuntio 1111,111111111.1111 = 2 ■•s �IIIIIIIIIIIIIIIIIIIIIIIIIIIIIiIIIIIIIIIIIII1miliIIII 1"""11111111""" _ —II- 14 PUBI_JIC A Fi\. _ .,REV �I :ItwiI !lllll illllli � :11 3 111•..- DISTRICT #1_ '; _111111111111111111: E ==;to ,�i ig .1111111111111111IP4 •• 1111111111111111: % � IIII11111111111r • ♦QED rin �‘%%d� 11111111;111/ $ •• ii --1 1111111111111111111111 ' 111111��.il �: ::::::: ' 1III► ,� � � . ��� 111111 11111111 .11i��1 ,..iiiii iiiiiiniiuniuiiiiiiuIII1111111111111111111111111111111F ____ ��I ft lllfluIITl fflTh II I I I I I I I Il I I I S � / t!Iii �� ,_.-.6-gird FT" _; _ (IflunTIrrj1TI1iIII1)C11ll1I1 �L� _� - i ev En w 4, 412 ,., %- , .... .... au ea im am .•#111.3 =c r•E li..... P.r..11.1"-P-M" � ='_ ==== = 75TH ST 1`1111111 Iiilllllllllilllll IIIIII hIIUll/�j _::: =l"E• ; •.- 1�� sisisii �1�1111�1111111111 1I1111�111i inie I =_ -- .,,, ���� ,���oho�oissin 111111111.'1111111 11111111111111�r��-�I����� rn__ini H®1�1i m:7.4!.•.•. ‘ 0 j‘V 10 To :..A/ RUE NOTRE DAMEos‘ '" rig: 4.•. ���%011111111Ik♦ :. 71 •.•••••••.•.•.•. , Ar ♦� /1 ,, ` \\\‘\\"1111111111* � r • - �� -..•..•••AL �� • 4 1111 1111... /.. Q_— __. ... . tit" tt‘10 0" • %.‘‘'''':•••••••***:'......... ... ..•....•.•.....•....'..............•... , 71ST ST t% rIsseit's t%ottotif 111111111111110 1%\111. #0 00;‘..‘...*%':•:•-:•!*::•::•,',:':•:'.1.•.:*::::::::-..7.;• ••:. ..'11:-.**••!•••••*.!•••••.;:.::_,_.•:1::::.%:::....:7.:.i.i:::: xr. ==r.. ...- it .: 111111 11111110111M° �t1��� �����` ���•f•�•'' ,.,•..•.....•,.•,•,•••. __ "--; -- - ••••••• �((��111 111�� ‘ `����������.':••:.•:,.•,,..•�'•.,::•'� i� - _'..••••••Ull-P" I • `�♦ �� �� .. in"I ..111► t ♦ 1i 111 ft is::; :�:�I1111�11111111111 .. �• •� so, �� ; ����11ti11 , . 0 ,� 1111111111•: • 0%♦ 1, 0.70 ``�t�.0♦ �tows 111111111111 i. ._ .::,:;:....:::: •�► `•moi • �� �\‘‘ % �‘ � ♦%‘ �1 1111. 111111111111 Q-- ••••••• ��� �r�i 1161111111 /111111111: '�� ♦♦`‘% ���♦♦` �tO i " ,0311111111111111, �..• ..... ♦ i� ° X11111111111111111111• • � � c:::::.......:•:•:. e** • �o h 11111 .I 1111 111 ♦ `�♦♦♦♦�♦... .%%to . �• ��•��t•,�& vi `�a 11 E 21;::::::::::::::: . nv 1,,'mil mow° - • F`ritl i 1 Ilii j11111`itl" �0��,�`�- ,�� is: : ;' : :: / /Is /IN/// i 111l11111111ii i gm. IMIIIIIIMIllis �1��ow o• ��� III =: ::::::::: APAla r......../............ imi we ioni::!:•:::::: • dia as a" in Iffi..;:i..1::.::::::i _ A it••1111 in fs SI s . gat:fil Ill firi a 2 'X /Lk ass 07,ma ell iii ig % .................. ••us.as.8 ii.e.•:•..:-..:. 11 .............x... pi es is- al aiii gil. ft..:.:.!•:.'•:.*.• 111111111 A* rom �•foe r r„................ I !:::1.:•:::•.% N ciiTals „„,., ir ... .. .... i "****.***.**. fa 8:•:•,...:;:-..;• , e lira ell 001 V ./ �•.••. -:•:• 63RD ST •` A It r .. �.. h. Illustration Depicting a Portion of the Capital Imp CI NEW PEDESTRIAN WALK - GRANITE SQUARES irl :('' kil . 4,0,94,4+ :k4064:4/4, �, c1 EXISTING 'I HEDGE ' 4 ,1 —.) - / 0 . Le RUE ,'' ,0 ` A44(.' o -- L---- t i ENDOM -16 A' Afmi,, .i� GRANITE SQUARE BASE II WITH NEW WROUGHT IRON i�� ' ,v ii\J \ni AND WOOD BENCHES NEW . ' PEDESTRIAN t,, NEW PINK / WALKS-GRANITE ` TINTED X11` 4 SQUARES SIDEWALKSft\",``, ���' • I 1,-) %'__ I att ' el 4,110V-*1* ..t. s, \ 1',4:-- _ . i N_ ii Nik Cif E. iroi .•: „ .•=,; .‘,4.,,e04:,., io, ,vg...,,, --, ''';';-;•A',,,E -; 4, . . . 1 ,...0,, , 1 . - "wl--1-g- P-ii •,‘ -, _ __I /Wks ' ‘ 4 vi :10;311 1 a 17‘ )7EXISTIN HEDGE PARKING 1 . ap NEW PEDESTRIAN WALK NEW PEDESTRIAN WALK ,a GRANITE SQUARE GRANITE SQUARE 1st STREET A b NEW PALM TREES AND NEW TRASH RECEPTICALS - - GRATES-BRICK SIDEWALKS THROUGHOUT ,r _ ( ' _ _ ff . . . I . ... CURB AND SIDEWALK COCONUT PALMS PLACED AS TO NOT EXTENTIONS WITH SIGNATURE OBSTRUCT VIEW OF STOREFRONTS SHADE TREES 1 t 1 • TREES PRUNED FROM SIDEWALK 6' ammampre7immill (--- -.) _ __ti __ ) __ f31:1 .-,-t.,i,...0 L - i i / 7;1. LL ---t-‘-).1 __ - 7 --_-'7 -"'' P. 1 11r�1 VL lc iUuiTht ili , , 7.......... __ ______ii : _____I i , . . i i i i :::::::::::: `, - -�/ r • moi • -,- 42 TREE GRATE____________.......... 4::-. - ____. WASTE CHANGE TO WIDER SIDEWALKS WHERE NEEDED NEWSPAPER BOX COLLINS AVENUE - Typical street-level improvement 7----"Yrsl-k.7) , - 1 . - a 1 7--) ,-, . , ,.) ,„ t, ,._ telA. #1:r.,-... ,.:- ...;:s 11 . ..,I , ,. L . I I fl, 11 r COLLINS AVENUE - Proper spacing of street canopy trees anddestria - lighting. n ltrel 174 OA1UIARL RESOLUTION NO. 92-20686 Authorizing the Mayor and City Clerk to execute a Local Government Reimbursement Program Joint Participation Agreement with the State of Florida Department of Transportation pertaining to the North Beach Streetscape Improvement Project. moo