RESOLUTION 92-20686 •
CITY OF "AMI BEACH '
TO: Richard Gatti DATE: 1/11/93
Public Works
FROM: Richard E. Brown,r16
City Clerk
SUBJECT: Streetscape Improvement Project
Enclosed are 5 agreements with the State of Florida Department
of Transportation pertaining to the North Beach Streetscape
Improvement project for signatures of the appropriate officials
and attestation by the Executive Secretary or Notary.
Please request that the agreement in the blue-back cover be
returned to Mercy Williams in this office.
She will subsequently forward a fully executed copy for your
files, together with a copy of the authorizing Resolution No.
92-20686.
Thank you.
E If
t i
RESOLUTION NO. 92-20686
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF
MIAMI BEACH, FLORIDA, AUTHORIZING THE MAYOR AND
CITY CLERK TO EXECUTE A LOCAL GOVERNMENT
REIMBURSEMENT PROGRAM JOINT PARTICIPATION AGREEMENT
WITH THE STATE OF FLORIDA DEPARTMENT OF
TRANSPORTATION PERTAINING TO THE NORTH BEACH
STREETSCAPE IMPROVEMENT PROJECT
WHEREAS, the City is undertaking a North Shore public area
improvement project; and
WHEREAS, the State of Florida Department of Transportation has
planned to undertake milling and resurfacing, repairing of
sidewalks, repairing of curb and gutter in portions of the area of
the City project; and
WHEREAS, in order to coordinate the two projects, and utilize
the same contractor for both projects, the City wishes to enter
into the Local Government Reimbursement Program Joint Participation
Agreement attached hereto.
NOW, THEREFORE, BE IT DULY RESOLVED BY THE CITY COMMISSION OF
THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Clerk are
hereby authorized to execute a Local Government Reimbursement
Program Joint Participation Agreement with the State of Florida
Department of Transportation pertaining to the North Beach
Streetscape Improvement Project.
PASSED and ADOPTED this 16th day of December , 1992 .
1PP
ATTEST:
AI IP 1
, ,_,A L-T-6N6Nii,"...__
("----- q.,ut,_
ity Clerk Mayo •
PNB: lm
Encl.
C:\resoluti\northsho.rev
FORM APPROVED
12/16/92 LEGAL DEPT.
By -2—C'D
Date 0/
Z0/.402__
•
1 •
• •
CITY OF MIAMI BEACH
CITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH FLORIDA 33139
OFFICE OF THE CITY MANAGER TELEPHONE: (305) 673-7010
FAX: (305) 673-7782
COMMISSION MEMORANDUM NO. '1
TO: Mayor Seymour Gelber and DATE:
Members of the City Commission Dec. 16, 1992
FROM: Roger M. Canton
Cit Manager -/
Y 9er l --
SUBJECT: LOCAL
GOVERNMENT REIMBURSEMENT PROGRAM, JOINT
PARTICIPATION AGREEMENT BETWEEN THE STATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION AND THE CITY OF MIAMI
• BEACH, FLORIDA, FOR THE NORTH SHORE COMMUNITY AREA
IMPROVEMENT PROJECT
ADMINISTRATION RECOMMENDATION:
The Administration recommends that the City of Miami Beach enter into a Local
Government Reimbursement Program, Joint Participation Agreement, with the Florida
Department of Transportation (FDOT) relating to combining the FDOT
Collins/Abbott/Harding Avenues Milling and Resurfacing Project with the City of Miami
Beach North Shore Community Area Improvement Project, and outlining FDOT costs and
• a scheduled manner of reimbursement to the City of Miami Beach.
BACKGROUND:
In the conceptual development of the North Shore Community Area Improvement Project
a number of meetings were held with the Florida Department of Transportation relating to
sections of the project on State right-of-way. At the same time, FDOT has in the same areas
a proposed project to accomplish milling and resurfacing of the streets, with minor
replacement of sidewalks, curbs and gutters.
In response to the City's request, FDOT agreed that it would be far more cost efficient and
effective to combine the projects into one contract, thereby, reducing the cost of engineering
and construction, and also minimizing the time of disruption to the area. A general
distribution of participation by area was agreed to as follows:
ROADWAY SEGMENT AGENCY
1. Collins Avenue - 59th to 75th Street CITY/FDOT
2. Abbott/Harding Ave. - 67th to 75th Street FDOT
3. Ocean Terrace - 73th Street to 75th Street CITY
4. 73rd Street - Collins Avenue to Ocean Terrace CITY
5. 74th Street - Collins Avenue to Ocean Terrace CITY
6. 75th Street - Collins Avenue to Ocean Terrace CITY
7. 71st Street - Rue Notre Dame to Collins Avenue CITY FDOT*
8. Normandy Drive - Rue Notre Dame to Bay Drive CITY
9. Rue Notre Dame - Normandy Drive to 71st Street CITY
10. Special Projects CITY
* FDOT participation is from Bay Drive to Collins Avenue
113
AGENDA
I TEM
DATE - z
} 1 r r
•
z a r
COMMISSION MEMORANDUM PAGE 2 DECEMBER 16, 1992
JOINT PARTICIPATION AGREEMENT BETWEEN THE STATE OF FLORIDA AND THE
CITY OF MIAMI BEACH FOR THE NORTH SHORE COMMUNITY AREA
IMPROVEMENT PROJECT
The City's portion of the total project will consist of funding landscaping, decorative
streetlights, decorative sidewalks and crosswalks,the placement of street furniture and special
treatment of identified areas such as the fountain on 71 Street and the Ocean Terrace area.
A separate maintenance agreement will be required with FDOT for these decorative
improvements on State of Florida right-of-ways.
FDOT's portion of the project will consist of funding the milling and resurfacing of the
roadway areas along with some identified sidewalk, curb and gutter replacement.
Additionally, FDOT will also fund, under a separate contract, the upgrading and installation
of modern traffic signal standards. This separate contract is being funded from Hurricane
Andrew emergency funds. Bids for this traffic signal work will be received on February 23,
1993, with construction starting within 90 days thereafter.
Financial Overview:
Preliminary Estimate of Total Improvement Costs $11,730,000
FDOT Participation Traffic Signals under Separate
Contract $1,610,000
FDOT Roadway Improvement $1,657,000
$3,267,377
Total Funds Needed Through Assessment $ 8,462,623
FDOT participation is estimated to represent 28% of the total project amount.
CONCLUSION:
On November 4, 1992, the City Commission authorized proceeding with the final design
documents for the North Shore Community Area Improvement, including the design plans
for the roadway improvements proposed by FDOT. The work on the City's portion has
started and FDOT work is being delayed pending the passage of an Interlocal Agreement.
On December 8, 1992, an advertised public meeting was held in the North Shore Community
to allow citizen review of the purpose, design and funding, including a definitive estimate of
the assessment to property owners. There were approximately 60 attendees at the meeting.
The overwhelming consensus was to move forward with the project.
The Administration recommends approval of the Interlocal Agreement between the City of
Miami Beach and the Florida Department of Transportation.
RMC\RAG\b
C:\bjs\cm-resol\cm-nshor
144
*****************************************************************
WPI NO. 6113777 FUND 010 SAMAS APPROP. 088793
FUNCTION 215 SAMAS OBJ. 563040
JOB NO. 87060-3569 F.A. No. ORG. CODE. 55064010606
CONTRACT NO. VENDOR NO. VF596000372001
*****************************************************************
LOCAL GOVERNMENT REIMBURSEMENT PROGRAM
JOINT PARTICIPATION AGREEMENT
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
AND
CITY OF MIAMI BEACH
FOR
NORTH SHORE REVITALIZATION PROJECT
This AGREEMENT, made and entered into this day of
19 by and between the STATE OF FLORIDA DEPARTMENT OF
TRANSPORTATION, hereinafter called the "DEPARTMENT" , and CITY OF
MIAMI BEACH, hereinafter called the "LOCAL GOVERNMENT. "
•
•
146
AGENDA - II
ITEM
DATE 1 2 -1 -c't
•
• I1
o '
WITNESSETH
WHEREAS, the DEPARTMENT is prepared to participate under the
Local Government Reimbursement Program pursuant to Section
339 . 12 (5) F. S. for the estimated eligible cost of the "PROJECT"
described as follows:
The City of Miami Beach currently has a North Shore
Revitalization Project which involves a streetscape
improvement program to the area on Collins Avenue from 1500
feet south of 63rd Street to 75th Street, and on 71st Street
from Collins Avenue •to Rue Notre Dame. The project will
consists of landscaping, providing decorative street lights,
decorative sidewalks, decorative crosswalks, and the placement
of sidewalk bench furniture.
The DEPARTMENT has, in it' s work program, a project which
includes the same area. The limits of the DEPARTMENTS project
are on Collins Avenue and on Abbott Avenue/Harding Avenue from
1500 feet south of 63rd Street to 75th Street and on 71st
Street from Collins Avenue to Bay Drive. The scope of work
for the DEPARTMENTS project consists of milling and
resurfacing, repairing of sidewalks, repairing of curb and
gutter along the DEPARTMENTS project limits. The purpose of
this agreement is twofold:
1 . To allow the LOCAL GOVERNMENT to design and let to
contract the DEPARTMENTS project in conjunction with the
LOCAL GOVERNMENTS North Shore Revitalization Project.
2 . Outline the DEPARTMENTS project costs and the scheduled
manner of reimbursement to the LOCAL GOVERNMENT. •
This overall effort will hereinafter be called the "PROJECT" , and,
WHEREAS, the LOCAL GOVERNMENT is eligible for participation in
the Local Government Reimbursement Project pursuant to Section
339 . 12 (5) , F. S.
NOW, THEREFORE, in consideration of the mutual benefits to be
derived from joint participation in the PROJECT, the parties agree
to the following:
147
•
1 . The purpose of this agreement is to provide for the
allocation of state financial assistance to eligible local
governments on project eligible pursuant to F. S. 339 . 12 (5) and/or
the Florida Transportation Plan.
2 . The LOCAL GOVERNMENT will prepare the plans,
specifications and estimates for the project. The plans must be
submitted for review in accordance with the Department' s phase
review process. The Department will review and return comments
within a period not to exceed 30 days. This process requires
sufficient copies to be transmitted to the Department for 30% , 60%,
90% and 100% complete construction plans reviews. Projects on the
State Highway System will incorporate Department Standards and will
be reviewed and approved by the DEPARTMENT and the Federal Highway
Administration, if federal aid funds are used, prior to letting.
If federal aid funds are used, the LOCAL GOVERNMENT must be
qualified and authorized by the FEDERAL HIGHWAY ADMINISTRATION to
perform the appropriate project phase. Except as otherwise
authorized in writing by the DEPARTMENT, the LOCAL GOVERNMENT shall
not execute any contract or obligate itself in any manner requiring
disbursement of Department funds, including consultant or
construction contract or amendments thereto, with any third party
with respect to the project without the written concurrence of the
DEPARTMENT. The DEPARTMENT specifically reserves unto itself the
right to review the qualifications of any consultant or contractor
and to approve or disapprove the employment of the same. It is
understood and agreed by the parties hereto that participation by
148
1 ! �t tt
the DEPARTMENT in a project with LOCAL GOVERNMENT, where said
project involves a consultant contract for engineering,
architecture or surveying services, is contingent on the LOCAL
GOVERNMENT complying in full with provisions of Section 287 . 055,
Florida Statutes, Consultants Competitive Negotiation Act. In all
cases, the LOCAL GOVERNMENT shall certify to the DEPARTMENT that
selection has been accomplished in compliance with the Consultant ' s
Competitive Negotiation Act.
3 . The LOCAL GOVERNMENT will let and administer the PROJECT.
The LOCAL GOVERNMENT shall obtain a permit from the DEPARTMENT
prior to entering upon DEPARTMENT Right-of-Way to accomplish the
construction.
4 . The LOCAL GOVERNMENT agrees to administer this PROJECT in
compliance with all laws governing the DEPARTMENT.
5 . Funds provided by the DEPARTMENT through this agreement
shall be expended exclusively for the DEPARTMENTS project within
the said DEPARTMENTS project limits. All in accordance with the
DEPARTMENTS scope of work indicated in attachment "A" .
y
6 . The DEPARTMENT shall provide the LOCAL GOVERNMENT the
DEPARTMENTS PROJECT estimated eligible cost as follows:
a. Project Design - up to $138 , 115
b. Construction Engineering - inspection (C. E. I . ) up to
149
$138 , 115 and construction up to the contract amount
($1 , 381 , 147) for work items identified as the DEPARTMENT
scope of work indicated in attachment "A" .
The DEPARTMENT' S participation shall be limited to all the
costs identified as the DEPARTMENT scope of work as indicated in
attachment "A" and any field changes as may be required relating to
said scope of work and agreed to in writing by both parties:
Schedule of Disbursements
1st Qtr. 2nd Qtr. 3rd Qtr. 4th Qtr.
Engineering/Design 31 , 076 31 , 076 31, 076 44 , 887
The disbursements for the incurred engineering design,
construction, and C. E. I . expenses shall only be made on a
reimbursement basis, upon submission, to the DEPARTMENT, of paid
consultants and/or contractors invoices, but not to exceed as
follows: Beginning from execution date of Joint Project Agreement
to June 30, 1993 - $961, 235 , and from July 1, 1993 to June 30, 1994
- $696 , 142 . The total amount for the project design, project
construction, and construction engineering inspection (C. E. I . )
shall not exceed $1, 657 , 377 .
7 . The LOCAL GOVERNMENT and the DEPARTMENT will be
responsible for cost overruns identified within their respective
scope of work.
8 . In the event this Contract is in excess of TWENTY FIVE
150
•
i 1 �1 11
THOUSAND DOLLARS ($25 , 000 . 00) or has a term for a period of more
than one year, the provisions of Chapter 339 . 135 (7) (a) , Florida
Statutes are hereby incorporated.
"The Department shall not, during any fiscal year, incur any
liability, or enter into any contract which by its terms,
involves the expenditure of money in excess of the amounts
budgeted as available for expenditure during such fiscal year.
Any contract, verbal or written made in violation of this
subsection shall be null and void and no money shall be paid
thereon. The Department shall require a statement from the
Comptroller of the Department that funds are available prior
to entering into any such contract or other binding commitment
of funds. Nothing herein contained shall prevent the making
of contracts for a period exceeding one year, but any contract
so made shall be executory only for the value of the services
to be rendered or agreed to be paid for in succeeding fiscal
years; and this paragraph shall be incorporated verbatim in
all contracts of the Department in excess of $25, 000. 00 and
having a term for a period of more than one year. "
9 . The LOCAL GOVERNMENT agrees to keep complete records and
accounts in order to record complete and correct entries as to all
cost, expenditures and other items incidental to the offering for
public bid and prosecution and construction of the PROJECT. No
funds provided by the DEPARTMENT shall be expended for other than
eligible expenses for the PROJECT.
Such books and records shall be available at all reasonable
times for examination and audit by the DEPARTMENT, as well as other
State and Federal auditors. Incomplete or incorrect entries in
such books and records will be grounds for disallowance by the
DEPARTMENT of any fees, expenses or costs based on such entries.
10 . The LOCAL GOVERNMENT agrees to keep such records and
accounts and to require any and all contractors and subcontractors
151
i t it it
to keep such records and accounts as may be necessary to
substantiate its request for payment from the DEPARTMENT. Such
books and records shall be available at all reasonable times for
examination and audit by the DEPARTMENT and shall be kept for a
period of five (5) years after the completion of all work to be
performed pursuant to the Agreement. Incomplete or incorrect
entries in such books and records shall be grounds for disallowance
by the DEPARTMENT or any fees or expenses based upon such entries.
11. The LOCAL GOVERNMENT agrees to submit bill for fees or
other compensation for services and expenses in detail sufficient
for a proper preaudit and post audit.
12 . The LOCAL GOVERNMENT agrees that bills for any travel
expenses be submitted in accordance with Section 112 . 061 , Florida
Statutes.
13 . The LOCAL GOVERNMENT agrees that the Department shall •
have the right to unilaterally cancel this agreement for refusal by
the Local Government or its contractor to allow public access to
all documents, papers, letters or other material subject to the
provisions of Chapter 119, Florida Statutes.
14 . The LOCAL GOVERNMENT warrants that it has not employed or
obtained any company or person, other than bona fide employees or
consultants of the LOCAL GOVERNMENT to solicit or to secure this
Agreement and it has not paid or agreed to pay any company,
152
corporation, individual or firm, other than a bona fide employee or
consultant employed by the LOCAL GOVERNMENT. For the breach or
violation of this provision, the DEPARTMENT shall have the right to
terminate the Agreement without liability at its discretion and to
withhold additional payments or funds budgeted and allocated for
the PROJECT.
15. This Agreement or any interest herein shall not be
assigned, transferred or otherwise encumbered under any
circumstances by the LOCAL GOVERNMENT without the prior written
consent of the DEPARTMENT. However, the Agreement shall be binding
to the DEPARTMENT and its successors.
16 . To the extent allowed by the laws of Florida, the LOCAL
GOVERNMENT hereby agrees to indemnify, defend, save and hold
harmless the DEPARTMENT from all claims, demands, liabilities and
suits of any nature arising out of, because of, due to any
negligent act or occurrence or omission or commission of the LOCAL
GOVERNMENT, its agents, or employees. It is specifically
understood and agreed that this indemnification clauses does not
cover or indemnify the DEPARTMENT for its sole negligence or breach
of contract. Performance of this Agreement is the specific
consideration from the DEPARTMENT to the LOCAL GOVERNMENT for the
LOCAL GOVERNMENT' S indemnity agreement. LOCAL GOVERNMENT agrees to
have its construction contractor indemnify the DEPARTMENT in the
same language or to the same extent as the LOCAL GOVERNMENT as
authorized by law as the LOCAL GOVERNMENT.
153
•
17 . This agreement shall continue in effect and be binding on
both the LOCAL GOVERNMENT and the DEPARTMENT until the PROJECT is
completed, final costs are known and appropriate reimbursements are
made by the LOCAL GOVERNMENT or DEPARTMENT.
18 . If the LOCAL GOVERNMENT abandons the PROJECT or for any
reason the commencement, prosecution, or timely completion of the
PROJECT by the LOCAL GOVERNMENT is rendered improbable, infeasible,
impossible, or illegal, the DEPARTMENT may, by written notice to
the LOCAL GOVERNMENT, suspend any or all of its obligations under
this Agreement until such time as the event or condition resulting
in such suspension has ceased or been corrected, or the DEPARTMENT
may terminate any or all of its obligations under this Agreement.
19 . The DEPARTMENT shall exclude all PROJECT costs incurred
by the LOCAL GOVERNMENT prior to the effective date of this
Agreement or prior to the date of the PROJECT grant application.
20. If the PROJECT is on the State Highway System the MBE
requirements of 49 CFR Part 23 and Section 339 . 0805, F. S. , shall
apply to the Agreement. Minority business enterprises and
disadvantaged business enterprises shall have the maximum
opportunity to participate in the performance of PROJECT contracts.
21. The LOCAL GOVERNMENT and its contractors shall not
discriminate on the basis of race, age, color, national origin, or
sex in the award and performance of PROJECT contracts and the
•
154
selection of applicants for employment in connection with the
carrying our of any PROJECT.
22 . If any provision of the Agreement is held invalid, the
remainder of this Agreement shall not be affected. In such an
instance, the remainder would then continue to conform to the terms
and requirements of applicable law.
23 . The parties agree that venue for any legal processing
arising out of this agreement shall be in Dade County, Florida.
IN WITNESS WHEREOF, the LOCAL GOVERNMENT has caused this JOINT
PROJECT AGREEMENT to be executed in its behalf this day of
, 19 by the CHAIRMAN, authorized to enter into and
execute same by resolution No. of the Board on
the day of , 19 .
LOCAL GOVERNMENT DEPARTMENT OF TRANSPORTATION
BY: APPROVED FOR FUNDING:
TITLE:
COMPTROLLER
ATTEST: (SEAL APPROVED AS TO FORM, LEGALITY
AND EXECUTION
TITLE:
ASSISTANT ATTORNEY
DEPARTMENT OF TRANSPORTATION
DIVISION ADMINISTRATOR
FEDERAL HIGHWAY ADMINISTRATION
DISTRICT SECRETARY
FORD APPROVED DISTRICT 6
LEGAL DEPT.
ATTEST. (SEAL_
EXECUTIVE SECRETARY
By OR NOTARY
Date
/2—/0/1Z-
155
R.I'E!iT I-)ATF ;21.1IIL92 TATS OF FLORIDA f EPARTMENT OF TRANSPOATATI3N PREVIOUS VIOUS JP:)ATE 21JJL92. 16.44. 29
ESTI"1ATES DFFICE i Er4G INri-.ERI NG SliPist3RT SERVICES LONG RA GST I- -INPUT-DATA-�A Tom- -- ------- - ------ ---
1--'- ! **t -I ' *4. -
: ** ' r • DA A ** PREVIOUS TOTAL= $626 104.24 (SCREEN 1)
l
• 1 ATE 21 JUL 92 .U.6 4;29 PROD. MANAGER: T ALVA E Z - MILES 1.344 FIS/YR. 1993 -
PROJECT NO. $7060,.:.$560 TYPICAL 'SECTION RSA SECNUMBER: 0 ., WPZ NO. 6113777 T1-___. -- .� i N I MEDIAN: : - GA
EXISTING LAVES: 3 R/W LEFT: 0.000 R/Va RIGHT: 0.000 5
PROJECT DESCRIPTION: COLLINS AVE MILLING AND RESURFACING BETWEEN 63 ST r4 c
COMMENTS : AND 75 ST (STAT IONS 16+00 TO R7+00) .�
E.ACT R ARTNW R ** ******** **************
MOBILIZATION I9
�
1(1.�}t�� MAIC A.�f~
�T T� �C �.0�.(� R I NAGE .
�� U A N 0 000.
OAROW I IPS. • •
120 CL .
�. ,2 � � �R LTE:
I ITE /A R5T :NN PIT AC..
,1
**** **** SHOULDER DATA ********************************* ----.
TOT WIDTH LT 0.000 TOT WIDTH RT 0.000 4
PAVE WIDTH LT 0.000 PAVE WIDTH RT 0.000 15
- .I3.A.S.F T TFM .. .. ._ BASETHICK 0.000 TZ-
SURF I TEM SURF.. THICK 0.000 .
_ 1
17
Ni . CURB WIDTH LT 0.000 CURB W DTH R
CURB IT��! ��U. �....r._. �� � T I)so 000 •
. :1a
f]
S0 W T T
�3
$ � RI 0
�+r 00 <_
(SCREEN 2) *************** , . *** . * ********
:4000 :5:.� W WIDTH RT 0.00
20
RD WIDTH LT 22.000 ROADWAY DATA ********** *********************� ( EEN 2)
ITEM
RD WIDTH RT 22.000 ?2
STAB ITEM ___N/A LEVEL ITEM 333 2 9 LEVEL THK 0.000
TACK ITEM 300 1 3
�.. M41L ...ITEM T 24A SE ITEM E
- ..�.�. _ .... . . N I CIS , > _
. U. :F IT "M.::: .
/` IT E.N
�. 1 (3R I V SWAY: R,ES .. :.
6
. 0.X00 PI�EWAY �3M
Q
W/WIDTH LT 04000 : .. W WIDT.1 :T 0.ao0 .
- :._. 28
W/BASE ITEM ___N/A____ W/THICK 0.000 2
E��GF STRIPE 1 CENTER STRIPE 1 Jr)
*#******************************** MEDIAN DATA ********************************* �--
3�.
- -� - �0--�±.1S�TH._._. ..... _ 0 000 MED SOD LT _ 0.000 MED SOD RT _ 0.000 32
M ..CURi ITEM __._ 0 .U : L .. 0.00.0-... MED CURB RT 0.000 . -_ ��_
L M SHL0 WI DTIC 0;700-, • - DTH .
# ****************** s ...
:��� ��.0 �l�I3TU 0.000
IGNI ANG LIGHT ....' **** ** **** * *
SIG 4 :t ST ..E�t MILE 15000.00- 0 T NG
(SC P.. 3) * ********************** - _ LI COST �S t3.04 ` _ ,.3
X-ITEM �X ITE. NUM3ERS *******************************- (SCREEN 3) 36
X-ITEM 32.7 70 5 X-QTY 34711.000 X-ITEM X-UTY 0.000 3;
X-I TEt•I X-QTY 0.000 X-ITEM X-QTY 0.00038
_X-ITEM • - X-' TY 0.000X--QTY _ 0.000 __
41."
EX E - 110-- x-ITEM 4 --.E - TY 1'0663►; 0Q- 7:777E UNIT PRICE_ 000 '
EX•-• ITEM 520 I 10 EX-QTY. 14200 . 41
" 00#� EX-,UNIT.. PRICE 9.000 a2
X+ITEM 522 1 EX:-,QTY 789€ .0
E�_U�IT PRICE 15.000 ,4�
.. EX-ITEM_ -�,. 180.000 E NI PRICE 75.000
FX-ITEM 6b0 2101 EX-QTY 54.000 `.
00 PkICE 350.00 J
*********************************** BRIDGES ************************************ --
TYPE NUMBER. LENGTH 0.000 WIDTH 0.000 FACTOR 0.000 --
-_ TYPE NUMBER _ LENGTH 0.000 WIDTH 0.000 FACTOR 0.000 �'
TYPE NUMBER LENGTH ' . ��, c WIDTH 0.000 FACTOR . ..0 $ ...:. r
TYPENUMBERLENGTH 0.000 J
WIDTH 0.110. F AC .. 0.030 .
TYPE NUMBER LENGTH 0.000 WIC H :0. 0 : F ..,...:'' ...:-'1:"'::::::.:. `TT' HAIL ` ' A So
T
HANG
************************* INT ERCHANG ES OR GRADESEPATIONS _****************** •
- - INT RC H-1ANGE7GRA0�� SE YPE 'N101M 111 FAL I UR . _ . C) ----- -_-__- . .. �. -
_ 0.-JOU-
SEPERATI DN TYPE NUA3EP. FACTOR 0.000 3
PAGE 1-16 54
NT RCHANGE/ORAOE SEPERAJION TYPE UIBER FACTOR 0.000
5
.---- _._.-._____ ---- - .. --- - .-. . • ..... .... _ -�- - --- - :6,
•
7
758
,59
R__.PN_T__�=+AT :2_1,ItiL92 AFLORIDA DEPARTMENT OF TRANSPORTATION PREVI�JUS UPDATE : 21JUL92: 16:44: 29
ES ATES OFF CE / ENGINEERING SUPPORT SERVICES-
LONG
ERVICES -- -- - -
LOJNG RANGE ESTIMATE FISCAL YR. 1993
OUTPUT DATA
OJECT MANAGER T. A .VARE -
OJECT OESCSiPTION COLLINS AVE MILLING AND RESURFACING BETWEEN 63 ST W.P.I.NO.: 6113777 i 0
MMFNTS : AND 75 ST (STATIONS 16+00 TO 87+00) �,
JJECT NO. TYPICAL SECTION SEQUENCE NO. EXISTING LANES PROPOSED LANES ROADWAY LENGTH 0
D
0
--- 8
060-3560 RSUCRESURFACINGDI 0 EDIAN - 01 3 3 .................______!f3___44 - 9
27
..C.41 C_OIATF1 QUANT I TI 5S. -. ---- . ..._AVERAGES__
TEM ITEM QUANTITY UNIT COST 4
ME3ER NAME PRICE COUNTY DISTRICT STATE , COUNTY . DISTRICT 15
CO
- ''.....:..:: .. . . • ' . ..:. ',, . ..: ...• - • . in
:En
5I
N1 _ 0
. .. . .....
♦
0 4 XXITEM1 10,663.000 $9.00 $95,967.00 .
rr
0 1 3 TACKITM 3,469.272 $0.95 3 295.81 $0.95 $0.97 • $0 92
� � � 41 54 MI
T
34.711,000 0
......:. . .
� b�4*��. .. ... :.. b `.�.:... _: . ..;, # 3.71 60
10. -.
:
3 -
x:11 '��::
. ...........
...............:..::.:....:....
.1 . - . . . . 29
....... .. ................
7- 1 2 FC ITEM 34,693.120 $0.96 $33,305.40 $0.78 $0.78 •0.96 1...- 1. al
' O 1 10 XXITEM2 14,200.000 $9.00 $127,800.00 $6.93 $6.95 $6.75 35 40
LE
XXITEM3 7,890•000
•
0 2101 XXITEM554.000 °
•
l... , �--_ i 3 6
1 CENTRSTR 2.688 $403.92 $1,085.74 $403.92 -408.41 $411..11 2-7 33 37
38
1 3 XX I TE M4 130.000 $75.00 $13,500.00 . . . . . 33
1 8 61 EDGESTRP 2� 8 3 + __ ;
! - : , • s « .X 6 11192.°2 f• ti .,
CE
,5
6
.,
,9
ea
• 51
,3
PAGE 2-16 54
5
59
RRE`JT- D _STATE (IF FLORIDADPpART� OF T Q�NS OR ATIUN ---- — PR 1/ '"JUS UPDATE: 21JUL92: 16:44: Z9
ESTIMATES OFFICE J ENGINEERING SUPPORTIC
LONG RANGE ESTIMATE FISCAL YR. 1993
OUTPUT DATA
OJECT MANAGER : T. ALVAREZ T
OJECT DESCR IP TION : COLL INS AVE MILLING AND RESURFACING BETWEEN 63 ST W.P.I.NO.: 6113777
MME NT S : ANT. 75 ST (STATIONS 16+00 TO 87+00) CO fi
s
I1JECT NO. TYPICAL SECTION SEQUENCE NO. EXISTING LANES PROPOSED LANES ROADWAY LENGTH 6
7
8
060-3560 RS i(R S RFACING UNDIVIDED MED IA 0I. 9
�.•��iY .�.fi YM►Wr�( � .. �� iMAViJY/iY•YMfMlM rFMAIIr���� � i- 57 00 S `CTI-ANO*01
s
11
DRAINAGE COSTS = $26,880.00 (SECTION NO. 01. ) :11
16
•
17-,
,
95ECTION 01 TOTALROADWAY ITEMS . 9 3•49
20
22
SECTION NO. 01 TOTAL BRIDGE COSTS = $0.00
24 :
• ••
25
26
MAINTENANCE OF F .
TSA C
27
•
28
MOBILIZATION $65,9874.18 i
30
31
• 32
...... ............... .....
33
TOTAL COST OF SECTION
NO. 01 /25i/359403
36
37
38
39
• 40
41
45
46
47
48
X49
50
51
53
PAGE 3-16
• S
59
-?RENTDATE :21JLJL92 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION PREVIOUS UPDATE: 21JUL92: 16:45: 59
ESTIMATES OFFICE 7 ENGINEERING SUPPORT SERVIC`S LUNG RANGE ESTIMATT=;TNIP T--STA-- - -_ - --_
(SCREEN **6 . . ►' **. ' N ** PRO ECT DATA ** PREVIOUS TOTAL= $36 504.24 (SCREEN 1)
I GATE: -..21..10192.:16:45:59 P1 :OJ. MANAG R: T. VA EZ'. MILES 0..170 F `S� YR. 1993 R3 .
PROJECT NO.: 87060- 3560 TYPICAL SECTION: R•S 5EQ NUM
BER .0.2 WPI NO. 411377
7 i.. MI 1-
- - ______.__.__ • r- • Ft Y ‘ - i - 1 R MEDIAN ' U
--
EXISTING LANES: 3 R W LEFT: 0.000 R/W RIGRT: 0.000 - - ---
-- -
PROJECT DESCRIPTION: ABBOTT AVE. (STATION 54+00 TO 63+00) TO 69 ST INT. 4 Li
COMMENTS : 4-1 0
***************************** :.FAC � �, *: ****. ** �* ** ***
AC T�.R�E AT�f� R ;- � � �������� �� ��** ���*���
MOBILIZATION 10400 MA INT TR:AFF IC .-:•::::::: 10.00-0 DRAINAGE 1.0.0
$ORRJW ITEM 120 ,1. LN/A_"
- A j .i- Chi • i. I str
12
********************************* SHOULDER DATA ************ • ******** . ***** . * * . SI
TOT WIDTH LT 0.000 TOT WIDTH RT 0.000 14
PAVE WIDTH LT 0.000 PAVE WIDTH RT 0.000 15
-__ ?ASF_,.ITEM... BASE THICK 0.000 16
SURF ITEM -... -- 7.7 SURF THICK 0•000 _
17
CURB ITEM1,1 -
� U. .�..�..�� . : UR > ���T� �T :. _0��}0d CURS WIDTH-RT fl`
x.00 . �!
S 0 -:WI DT T0:?.5.50- -
�. : slit). WIDTH RT 0. 00
S -W ITEM NO. N/ $/ WIDT 0 010 S W WIDTH RT 0.000
(SCREEN 2) *************** U*** ********
ROADWAY DATA ******** . . ** . . ******* (SCREEN Z1
RD WIDTH LT 19.500 RD WIDTH RT 19.500 IN
STAB ITEM N/A __ LEVEL ITEM 333 2 9 LEVEL THK 0.000 ril
.... - - --- ------..-... .... I?'I _I TEM I .... 1. 9 - --- - TACK ITEM 300 1 3 ,
E
E ITEM
-. . ..SURE T�I
FIC ITE 337
: .._ � ,. ..000
m
/ N i 2 ..
LAR �
E .A Y RE S _ _ .. -;; ;-. �i Y C -. -.
W .:.W��T 1,-' . 14
l H LI, .
: : T RT ,�04
W/BASE ITEM __N/A W T ICAC �__
0.000 Ej
EDGE STRIPE I ---- CENTER STRIPE 1
IN
********************************** MEDIAN DATA ********************************* EM
MED...WID- H .- ._ -..... 0.,0.00 .....MED.. SOD. LT ... 0.000 MED SOU RT 0.000 gi
URS ITEM _......,t /A M -CURB LT 0.004
L. SHLO WIDT U0 RM SHAD• WIDTH 0.000
***************** *** - SIGNING - LIGHTING • *********************
-
0 - LIGHTING COST-LS 0.000 • 36
�T�h�NG CAST PPR ��;l.F 1000: -
00
(SCREEN 3) ************************ X-ITEM / EX-ITEM NUMBERS ******************************* (SCREEN 3) 37
X-ITEM 32.7 70 5 X-QTY 3900.000 X-ITEM X-QTY 0.000 m
X-ITEM X-QTY 0.000 X-ITEM X- TY 0.000 CI
X-I_TE M. - -X-QTY_ 000, . T
.X-ITEM . X--QTY 0.000 40
E ITEM .:110 4 E -Q: Y' . 1595.004 7FX--.UNIT PRICE 9;000
*-ITEM 520 1 10 EX-QTY :. 1795.000- EX-UNIT PRICE • 9.000.
E:X--ITEM 522 I EX-i'QT l ::. 997.000 EXE-UNIT PRICE 15.000
EX--ITF.M -- - 66t) 2101 FXV -QT ' 34.000 EX-UNIT-PRICE _ - 350.000
EX-ITEM EX-QTY 0.000 EX-UNIT PRICE 0.000 na
*********************************** 3RIDGES ************************************ II
TYPE NUMBER LENGTH 0.000 WIDTH 0.000 FACTOR 0.000
TYPI N(JMIjFR .. l ENGT. 0.000 WIDTH 0.00 0.00 ,:
TYPE `•i U!'4 P E R Q _ ACTOR _------------ 0 __
- N _...T 0 Gtr 0 00 R0-.003TYPE -
�..E � , , . :. . �3 ��0 T#~� Q ATO �
NUMBER ' LENGTH 0.000 WIDTH . 0.000. FACTOR 0.000 m
TYPE NUMBER .:LENGTH ,0.000 WIDTH 0.000 _FACTOR 0,000
***********************-** INTERCHANGES OR GRADE SEPERATIONS **:**************** :
INTERCHANGE/GRADE SEPERATION TYPE NU�1BER F _ _ --
ACTOR; 0.000- -- _�-
INTERCHAN;E/GRADE- SEPERATION TYPE 'DUMBER FACTOR 0.000
INTERCHAwGF/GRAD?E SEPERATION TYPE NUMBER FACTOR 3.000 PAGE 4-16 oa
, SI
SA
.ti
`.9
f-
RR.
E N T- _DAT :211_111_9_2_-----_- ------------- _T E C1 F FLORIDA D E P A T M E N E RA S P O RZ T A T I O N U P;)ATE: 21 J U L 9 2: 1 6: 4 5: 5 9
-- ] --
ESTIMATES OFFICE / ENGINEERING-- S RT SERVICES
_ _..- _ _ PREVIOUS-------- --------------- -----
- ---
LONG RANGE ESTIMATE FISCAL YR. 1993
OUTPUT DATA
O J E C T MANAGER : T. :AL VA R E ._-••-_ -____...---- - _ i
OJECT�DESCRIPTTON : ABBOTT AVE. (STATION 54+00 TO' 63+00) TO 69 ST INT. W.P.I.NO. : 6113777
MMEhTS Cs _
7-4'
OJECT NO. TYPICAL SECTION SEQUENCE NO. EXISTING LANES PROPOSED LANES ROADWAYLENGTH _
D 6
RSU(RESURE4CING . U IVIG: D E: IA I • • • -- :-.--
060-3560
rr}}
. . . . ' . ---T . : .... ..... .. . . :. -. .: . . . . :.:. HT
TEM ITEM QUANTITY UNIT COST if
'OBER NAME PRICE COUNTY DISTRICT STATE COUNTY ;s'
DISTRICT
-..+....,.v—..�-............ - -•------ :i.u:::.r:ris:ait+,;:a+aw+.+++war.+tia
.. cif►aMsiii...r++r..K,••r ..rr• .*.*. .. .
. 14,PQ0 $2 .
..-..0.0 H. .'.....: : ........:s.i.c.::---:-- •. . ' ..' ::..--1:.-:- . • e .-.., - :-.::- ':. - ..::1-:-:!!‘..:-...:::...-H: ,-I-.' -:-- - . i139-
3 4 XXITEM1 1,595.000 $9.00 $14,355.00
3 1 3 TACKITM 388.955 $0.95 $369.51 t
$0.95 $0.97 $0.9,2 41 54 ??
�} 5
..)CITEM1 - .:-. :-...3.- 90.0.«900..-: .. ::::-.:.:H:.::...::::-....-......:::::.. 4.0.:*7.'E:.li:!:.1::::::-1.,:t§..1..F.::::!:....h!:]...4gi7:4,......:99. :..::: --:::::::.....'.:::::',,...:.:...:-
�r.
2a
1:::: 1 .1...'......... .-.. ... .$0.7:1 - . S-P---.---6Z :- .:: . . .:... ..:::::.. . ...:-:- ......:::- ..:-.::'..::-...i.. . . - :., ...-...: .:.:z..--:::25
IT
.3411894600
• l 1 2 ECITEM 3,889.600 $0.96 $3,734.02 $0.78 $0.78 X0.96 ... . : .1... _ _
1 29
. )- 1 10 XXITEM2 1 ,795.000 $9.00 $16,155.00 $6.93 - $6.95 $6,75 35 40 --
XX _M3 997.000 $15.0 ••":$14: 955.00
$1 . x.13 ;351
2101 XXITEM4 E 4.000 i • $350.00 --::: $1.I.,990.90 i -.::. • • • :. 4 . * . • - • .E:.:::::. -•*. • 4. - 0 . . o . --:.... . .:.:, . . .. II -. . ',,u.
1 1 CENTRSTR 0.340 $403.92 $137.33 1 $403.92 $408.41 431.11 733 ,37
37
L 8 61 EDGESTRP 0.340 $1,593.34 $541.74 $1 ,593.34 $1,609.06 $1,192.02 7 838
39
, ,,I___H-7
43
44
45
46
47
- 48
50
--_ — - 51
53
PAGE 5-16 54
5
• - — 6
� 5 7
58
5�
?RE;41- DA_TL_ =._��.l��JLS2 ___-- ESTATME TOFS FLORIDA D PARTME �! OF TRANSPORTATION PREVIOUS UPDATE: 21JUL92: 16:45: 59
59
- - -- --�
LONG RANGE ESTIMATE FISCAL YR. 1993
IJ!JTF:JT DATA
JJECT MANAGER : T. ALVAREZ
- - - - - - - -----
ECT DESCRIPTION = ASDtTT AVE.. (STATION 54+00:170 . 63+00) TO 69 ST INT. W.P.I.NO.: 6113777
1MEAlT5 2
)JECT Nn. 5
TYPICAL SECTION SEQUENCE NO. EXISTING LANES PROPOSED LANES ROADWAY LENGTH • `6
}6 0-356O RSU(RFSU)RFACING UNDIVIDED ME IA
02 3 3 04unTAE-73P-11.E.t7,0EXR-TTriziS.""3.7-7-7..-""-•"7.7.-""*.::H.:,-7.:".": -7, 777.7—f. - S'ErTT731q-NZ)-;-12;i7.777-7"...7.77:77:77777.77777:777::'
10
/RAINAGE COSTS = $3,400.00 (SECTION NO. 02.) a
is
17
FCTI
N 02
TOTAL .,
ROADWAY
,ECTION NO. 02 TOTAL BRIDGE COSTS = ”3i1.4*•10 —
?2
. 0.40
za.
24A
I T , .
�A�tC
... .......... .....: .:.............
t
_ _ • 27
�O B I L LAT
I O�� -----..----
z
36
_ 31
OTAL C •
OST �� SACT ,- • • 33
I�N �Qw
37
38
39
-
-;CT
41
• 4
44
45
46
47
- ----- -
48
49
50
51
• 53
PAGE '6-16 s4
- -- -
57
59
.kE.-Nr__ i.ATI__:,?1_.11.11.3 TE O_F FLORIDA D PAR P. NT JF TRANSP33RTATION °REVIOUS UPDATE: 16JUL92: 03: 27:56ESTIMATES OFFICE ENGINEERIrG SUPPORT SERVICES LONG MANGE _STIMAIE� -INPUT DATA
_ �
* PROJECT O1aTA **. . .PB'"\/IOUS TOTAL= - - $8:11504.24 (SCREEN 1)
ALVAREZ . MILES 81170 FIS/YR. 1993
i��DATE* i,6JUi,.9 ;082�' 56 PROJ �tAa'�!#�Ef�: . 0. !f
r
PROJECT NO.: 87O6Q-3..56. ...' YPICAL SECTION .. .RSU SEES NUMBE t: WPI NO. 6113777 - EI
PROJECT
k ' R MEDIAN: ij �'- • 0
EXISTING LANES: 3 R/W LEFT: 0.000 R/W RIGHT: 0.000 Q
PROJECT DESCRIPTION: ABBOTT AVE FROM 69 ST. TO 71 ST. (STATION 63+00 TO 'I
D
COMMENTS STATION 72+00) 0
FA T :./EwARTHWOg *****t**** *********...*******.**** --
OBILI MOBILIZATION 10.000 MAINT TRAFFIC 10.000 DRAINAGE0
1.000
BORROW ITEM _
120 2 2 CL t GR ITEM ---N/ .L.,...r-
. k I. - > k 4: 440 1 . ` 0.000
*************** • *** • ******** SHOULDER DATA ****************� * . ***�****�k* -ii
rm
TOT WIDTH LT 0.000 TOT WIDTH RT 0.000 14
PAVE WIDTH LT 0.000 PAVE WIDTH RT 0.000 - '15
BASF ITE:! BASE THICK - 0.000 t6
SURF EM
SURF
0.00 --
17CUR E NO. ........... lA �. t1 4�ITT 0.000 CUWIDTH RT .Q0t1
o0 D .�: LT f:: S0€� WIDTH RI 0.00q
M N S/W WIDTH LT -0.000*_____VM: WIDTH RT 0.000
(SCREEN 2) ********************************* ROADWAY DATA **********************************
R WIDTH (SCK��N `�
D LT 19.500 RD WIDTH RT 19.500
gl
STAB ITEM __ N/A LEVEL ITEM 333 2 9 LEVEL THK 0.000 Pi
300
3
BASE ITE: N A
.. 1 : :; :... :: BASEK 0.40 $ • ,
.: SURF ITE
1 .
:. .;
SURF
THICK
. .
• -,::::..:..:::::: .::4:::,:L.. .- .• ::.....H::: . m
mE/C I TES 337 1 2. OfIY iiAY/REQ . . ..p. 00 I eW1 fcDM 0.0.0W/WIDTH `L . 0,flf. U/WIDTH RT
• 0.000
W/BASE ITEM __N/A____ W/THICK 0.000
EDGE STRIPE 1 CENTER STRIPE 1 �7
********************************** MEDIAN DATA *********************************
iii
- MED. .WLDTH..._- .. ... .... ..... .. ..0.-Q,40 ..... E. QO L.T 0.000 MED SOD RT 0.000 El
M/CURB B ITEM ___N/A_� E �:. R8 LT 0.000 MED CURS-RI 0.000 ____--
L. � .SN10 WIDTH
033
MLt� IDT# ±Q.4U0
.........
SIG I I ******** **
.::!il.'::''.;•'::::::;:.:1:::i.:: :-:.-'..:::Ii::t...:...::::•:..:1:2::::;J:ill,..11:1';':i.,:::!!::.d.:::i'::.:::1.:•:::::::.':.f.',1'::::.:t;:::::::.:.-'1:;.ii... 111
S,IGNI-NG- COST PER MIFF 15000.000 LIGHTING COST LS 0� `000 :.... . :. •
(SCREEN 3) ************************ X-ITEM / EX-ITEM NUMBERS ******************************* _ 36
X-ITEM X-ITEM �} 37
327 70 5 X-QTY 3900.000 X-ITEM X-QTY 0.000 m
X-ITEM X-,TTY 0.000 X-ITEM X-QTY 0.000
X-ITEM X.-4TY 0.000. . .. X--ITEM __ X-QTY - - 0.000 --
: I...-ITEM ,10 4 EX-'-QTY .1 95.000 EX-U IT PRICE 9.00
- EX-ITEM 520 • 1 •_ 10 EX--QTY 1795.00 EX-UNIT PRICE 9.000 UM
.E X-ITEM X22 1 :. ,.,.EX-QTY ` . 997.000 EX-UNIT PRICE 15.000
•... c,, '"" 0.0U EX-UNIT PRICE 0.000 an
.
P .,
EX-ITEM EX-QTY 0.000 EX-UNIT Rich o.QOo
*********************************** BRIDGES ************************************ RI
TYPE NUMBER LENGTH 0.000 WIDTH 0.000 FACTOR 0.000
TYP-E _ NUMBER LENGTH 0.000 WIDTH _0.000 FACTOR _ 0.000
TYPE NUMBER LENGTH 0.000 WIDTH 0.000 -FACTOR x:000 -- ---_-
TYPE .NUMB �# 23
LENGTH.::..,..: ::, .::. 0.000 �L#�TH 0.000 FACTOR 0.000
TYPE NUMBER LENGTH .. 0.000 WIDTH,. 0.0000.00323
FACTOR
******* * *** ***# * INTERCHANGES OR GRADE SEPERATIONS *****************�a I1
INTERCHANGE/GRADE SEPERATION TYPE NUMBER �7�I:T7R---- - 0.0-DO --_
INTERCHANGE/GRADE SEPERATION TYPE NUMBER FACTOR 0.000 _ 30
INTERCHANGE/GRADE SEPERATION TYPE NUM3ER FACTOR 0.000 PAGE 7 16 ao
1i
au
J`9
RR c NT_LA __;2.1JUE92 _ _STATE OF FLORIDA DEPARTMF�'NT OF TRANSPURTAT IGtti PREVIOUS UPDATE: 16JUL92:OB:27: 56
ESTIMATES OFFICE / ENGINEERING SUPPOk Sc S- ---
LONG RANGE ESTIMATE FISCAL YR. 1993
' OUTPUT DATA
OJECT MANAGER
8. ALVAREZ ,.. -- - - 1
OJECT DESCRIPTION . ABBOTT AVE FROM 69 ST. TO 7I. ST. (STATION 63+00 TO W.P.I. 6113777 2
NO.:
MMENTS : STATION 72+003 1—
-- -- _ Wit 4
5JJECT NO. TYPICAL SECTION
SEQUENCE NO. EXISTING LANES PROPOSED LANES ROADWAY LENGTH 6
060W-3560 RSU(RESURFAC.ING UNDIVIDED MEDIAN 03 3 f 9
......,i......awn+.....«+w ww�.......++.+w►wr+w,r——...�.r--•�..•� 1.r..�rr++ar.rrw►wa .wr+rw�r.w+w►w«.►«rM«+�w►wr«+++«►.�w«-.r.�.r.. �. 1
.rr...rad+r:aww►1w►.arwaw►w«wa.4.10�.11*4401 44014.110114441,100,
11
-- ---— 1 .I.. LJ 1-:4TE f.-:QU.AIT T T I.FS
- --..: .AVERAGES _ .- ----- _ COUNT 12
1
TEM ITEM QUANTITY UNIT COST 14
MBER NAME PRICE COUNTY DISTRICT STATE COUNTY DISTRICT ,5'
_ _...._. 16
17
SIGNING 1.000 $21550.00 $27550000 19
:90 t
6------4 XXITEM1 1,595.000 $9.00 $14,355.00 •
• • \ •1
0 1 3 TACKI TM 388.955 $0.95 $369.51 $0.95 $0.97 $0.92 i 41 54 22
T 70 5 X:IT ' :: - - -
E �. 3 00 0 $.2:i7.49. :00.1
004 0 724 {.
fl7
t3
25
8 *
2
_1.� $1.80
$ l
7 1 2 FC I TE M 31889.600 $0.96 131734.02 $0.78 $0.78 $0.96 . ::.y.. ..: 29
30
0 1 10 XXITEM2 1,795.000 $9.00 $16,155.00 $6.93 $6.95 $6.75 35 40 3i
XITEM3 997.000 {3 .
$I50 $��� ��► �►€�d $�� �7 $�.�.65 4 3 33
41 1 CENTRSTR 0,340 $4 .92 -137.3 $403.92 $408.41 $471•1 . <�7
33
36
1 8 61 EDGESTRP 0.340 $1,593.34 $541.74 $11593.34 111609.06 •1,192.02 37
38
39
0
•1
•2
•5•
'6
.8
.9
5�
51
3
PAGE 8-16 54
5
y 7
•
58
59
- 1-JUL-32----------- STATE OF Fl f1RIt1A LiEPARTMEINIT OF TRANSPORTATION' PREVI'JUS UPDATE: 16J'JL92: 08: 27: 56
ESTIMATES OFFICE / ENGINEERING SUPPORT SERVICES --- — ___ —_--- -�
LONG RANGE ESTIMATE FISCAL YR. 1993
OUTPUT DATA
OJECT MANAGER 3. AL `A# E
OJECT DESCRIPTION A I TAVE. FROM69 T. TO71 ST. (STATION 63+ TO P
MMENTS : STATION 72+00 .I.N0.: 3�''�7 - 2
-ler 5
OJECT NC. TYPICAL SECTION SEQUENCE NO. EXISTING LANES PROPOSED LANES ROADWAY LENGTH Gig)
ei 8
360-3540. # Ski(RE v 0E.0. O IA t
TAT :. ,��r_�.::�..
.:.,... �� .,.., ....,,.. .. �+anvwv+.+w!��..��++ur.a+r�rrw+�►+u+wr.M►wr+ww a,.►• 0
; ,P w� 1.� �4 �j'�'
IRA IMAGE COSTS =
$39400•00 00.00 (SECTIJ(4 NO. 03. 1 14
15
-- — — 16
EST € :{ 3
TOTAL. OA .�
� � �T� S 1
7� 4�1 a
� .1O
91
)ECTION NO. 03 TOTAL BRIDGE COSTS = $0.00 22
24
...................
1AI
. .......:...
TE -
F
,;. 26
27
IOBILIZATION _ $7,864.02
�. �. �- - �.� 29
29
30
31
32
-OT AL COST OF SECTION NO... 0 _ 33
$861504.24
34
4,,
.1
42
ga
OS
P5�
51
3
• 4
•
5 4
w,
��1_L_ AT =X1,,1�,1 �2 _ STATE OF FLORILA DEPARTMENT OF TRANSPORTATION PREVIOUS UPDATE: 21JUL92: 16:47: 25
STI.1ATES OFFICE 1 ENG ItJEERING Ji POP.T SERVICES LONG RANGE- STIRA-TF4- -INPUT I A-T ----- - --
_ (SLRFI N 1) **DIST fiLOrK N ** E- ** PROJECT DATA ** PREVIOUS0
T TAL--
$110L707.89 (SCREEN 1)
INOATE: 21JU192 16:47 5 PRO MANAGER: 8. ALVAREZ MI ,ES 0 2 4+
EIS!
O. 8 Yet. 1993 2
PROJECT O 87060-3560 TYPE AL SECTION RSU SEQ NUMBER: 04 WPI Na. 6113777
3 -tL. PRD S;D LANG: 3 L CATION: R MEDIA is U 4
EXISTING LANES: 3 Rl LEFT: 0.000 R/W RIGHT:
__�
PROJECT DESCRIPTION: -IARC ING AVE (STATION 72+00 TO 67+00 FROM 71 ST. TO 0.000 s
COMMENTS : 75 ST. ) 6
****************************** FACTOR/ EA THWORK ************4** ***** 7*4c*4* 8
MOBILIZATION . 10.000
MAINT TRAFFIC 10.000 DRAINAGE 1.00tJ
BORROW ITEM
120 2
EMBANK
2 CL
K_ ITEm - :P , ! • # _ , ` T
Fl o oo
0.
.. .. ... z
.
. /
l****{*****y*** *** • ******** SHouLorR DATA ******** • * � * .
- TOT WIDTH LT 0.000 TOT WIDTH1
RT 0.000 14
PAVE WIDTH LT 0.000 PAVE WIDTH RT 0.000 i-5--
BASE
.-ITL,"'1. _...- P'ASE THICK 0.000
CUSURF ITEM SURF THICK ----- 0.(3i� 18
.. ITEM NO. .T.__N/A- CURB WIDTH LT 0.000 CURS WIDTH RT 0.000 18
S 0 WIDTH LT 0;15-60 ,:: .
SOD WIDTH 11411: 2 (�f�
,� 0.000S W WIDTH 0.00 .
(SCREEN 2) *************** *** • • ******** ROADWA DATA **** • * * ***** • ** ** . * * •1
RD WIDTH LT 27.000 •1
STAB ITEM _ _�'U/A _ _ LEVEL ITEM 333 2 9 LEVEL WIDTH 0TH RT 27.000 22
THK 0.000
• . FMUL T TEM 100 I -9 A K ITEM 300 1 3
BASE ITEM N/A
25
ITEMSURF -311
T1
-
THICK ,2.000 _
2s
ift ITEM
26
337 I ...,.,.,..,..
_�����: �;, � .3YE�tAY/CUM _. 0.000 :.
-FW/WIDTH _
1 H LT 0.000
;, � WI�1TH RT _ I.i3t10
27
• w/EASE ITEM
---_N/A____
WITNICK 0.�0$ ---� .. . _ 28
EDGE STRIDE 1 .-...-.. 29
CENTER STRIPE 1 30
********************************** MEDIAN DATA *********************************
ME s W R F 0.000 MED SOD LT 0.000 MED SOD RT _ 0.000 32
31
� °... I * : 0.000 MED CURB RT - -0.000 -'
,,' SHLOIL `' . 0; 033
r RM �h�D W I DTH 0.000
SIGNI G - LIGHT **** * 34
► NG. COST PER MILE 15000•00Q LIGHTING COST LS 0.000
(SCREEN 3 ************************ X-ITEM EX ITE' NUM3ER� ******** * # * * ********* * (SCR36
EN'327 70 5 X-QTY 6241.000 X-ITEC! X- TY tSC E N 3) 37
38
0.000
X--ITEM X--QTY 0.000 X-ITEM X--QTY 0.000
-
Ar
0
__
-m -
-4- EX-QTY
1849.0
-FX liNIT PRICE
39 X-ITEM X-QTY 0.000 4X- YX- M1.EX-ITEM 520 110 EX-QTY3000.000 EX-UNIT PRICE 9.00042 522EQTY 1667.000 EX UNIT PRICE 15.000 •3R NIT PRICE 0.000 ,4tX-ITEM EX-QTY
0.000 EX-UNIT PRICE 0.000
Y *********************************** BRIDGES ************************************ 's
TYPE NLNTER LENGTH 0.000 WIDTH 0.000 FACTOR 0.000 '6
TYPE NUMBER _LENGTH 0.000 WIDTH 0.000 -- FACTOR 0.000 ,7
TYPE NUMBER LENGTH 0..000 WIDTH- 0.000 FACTOR - 0.000 .8
TYPE NUMBER LENGTH -9
0.000 WIDTH
�.00 fl FACTOR ,�0.000
59
E _ NUPE ER LENGTH 0.000 WIDTH - 0.000 FACTOR 0.000
� 51TY**P********************** INTERCHANGES OR GRADE SEPERATIONS *** ******* ***** � 3INIERCHANGE7GRADE JPFRATION --TYPE N ER FA-CTDR- �_ U.000INTERCHANGE/GRADE SEPERATIQN TYPE NUMBEP FACTOR 0.000
INTERCHANGE/GRADE SE PERAT I ON TYPE NUMBER FACTOR 0.000 PAGE 10-16 s4
. - s
_-��__ -- _. __----- - - --- - - 56
59
iv,I.:;:If__k -21JuL9 - STATE OF FLORIDA DEPARTMENTOF TRANSPORTAT ION R r -
�_ ��� P' EVIOUS- UN,�ATE. Z1J.1L9Z- 16-47. Z5
ESTIMATES OF TC / ENGIN7cRIP.IG SUPPORT SER RANGE ESTIMATE FISCAL YR. 1993 1
_ A OUTPUT DATA
C p NA6ER : 8.
ALVARE; J
OJECT E CRY OiA i AVS• (STATION 7 +00 TO 87+00 FOM 7 ST113777 :
T2
MMENTS• 75 ST.)
OJECT NO. 4
TYPICAL SECTION SEQUE�JCF NO. EXISTING -
TI'VG LANES PROPOSED LANES ROADWAY LENGTH �,,,l 6
060-3560 SU(r�gSUR�.�C��#� u�'�ior�1'.�o £� MED,IAN _ 8
4
..:, i i
.� - .. ..... .. .. .... -. .. .. .. Tom. .... Y.ub,�il.iM�--------'-'7-.-- 77"'"""7--".---7"--7------77777:'-'..:.:.'
... ..i,...::„..•.H:.:-..3 :7-77.7.7.7.77.7;i7.40..4 �.4.
. .... arr.�r w++++w�►,«►+w�r++.wr►.ww�w
-.rra�r�
iiiii\1*-H:H. ' :... ''' '..::.-.. :••:'.i.:.•:•-•-:•••.,.-•::•':- 71
a�waw
� Q
•i
VEcAGES
TEM ITEM QUANTITY UNIT COST
MBER NAME PRICE COUNTY DISTRICT4
__ .. -- -.. ..Y.......... .. ... STATE COUNTY DISTRICT
17
0
,, �� INS _.
Q
. 2
4 •
4 XXITEMI 1,349.000 $9.00 $16 6240Q1.*.0Q00 z
0
1) 3 TACKITM 899.701 $0.95 $854.72 $0.95 z2
7 _ .._ � $0.92 41 54 �
7
, . p ,T. :,,,.-, z4
:7 :
•
?87
$ 73
� �.S fI li-:
7 1 2 FCITEM 8,997.120 $0.96 $8,637.24
_ z$
t $0:7a � 0.78 0.96 29
1 10 XXITEM2 3,000.000 $9.00 $27,000.00 $6.93 3
. $6.95 $6.75 35 40
$25,00,0f)... $ 3.3-7 2
33
$ 03..92 229
8 61 EDGESTRP 0.568
3
;3 . . . ,Lt65,
$1 593.34
t- $905.02 $1, 593.34 1,609.46 I $1,192.02 7
1/4'
37
38
— 39
- 4fl
'H. 41
42
43
45
46
47
48
—� 49
50
51
52
53
PAGE 11-16 54
55
56
57
58
•
'6 S
f-
z S -
is
GS
60
90
Lb
9b
Sb
VP
Eb
Zb
lb
-
EE _
9E
LE
9E4
EE
S -- 0 '0N N
ttS4�
r` I .Rk J
.
ZE
lE
OE
6Z
ez -7:
-.._- LS'LQ+76£T = 18 0
:::<.::
�,
9Z
b
Z
00.0$ = S1SO0 3 9012 1V1O1 +iO •
ON NOI103SZZ
8l
V
�n3.I ip35
91
a`t ( •+so .ON NOI103S) 00'0R9115$ f
. z� 1SOD 30NIVbU
II
a E c ( NVIO3W f 0I IOifl ONIDV f S )f15 U9 E 0903
L
91.11, H10N31 AVMOVCb SENV] 03SOd02�d S3NV1 ONIISIX3 ••0N 30N3(1b3S
S Q� NO1133S ld�I dAl
b ,,./ 'aN 1�3�0
, _____ „__ , _______
...._.
_4_ E
z �.LL Z9 :"0 •i' • r (*is L `: S1N3W�►
01 ..S I L WOliA 00+L8 OL 00+ZL NOIIVIS) 3A V 9N I O2iVN = NO I1 d i blS30 10.
3r0
. --;
7311VA1V '9 : d3OyNvw 133rO
vivo lfldl(lU
£661 • A 1VDSI3 31V611S3 3ONVd ONL1
-- --_S3lTA S____LEEdOS SWIAq 1ON3 / 3D13 S31VWIISD
S Z :L :9T :Z6lOf Z :311 (]dn SPC I A. d N0I iV1 C'dSN.t� j1~30 N31n' � - 4 -- ---- _
1 ldt d3G dQIdC��:� 3U 31t�1S -- - -ZE��f1rTt: ��1dU 1N18U;
RRE;, __LATE__-21JUL92 �, STATE OF FLORIDA DEPARTMENT OF TRANSPO, PREVIOUS ► : : 6: :
RTAT ION UPDATE: Z1JtJL92 1 4d 34
ESTIMATES OFF ICE / ENGINEERING. ST PUP 1 SERVICES -LONG RANGE- 1 I61f --I PUT--�A.rte- ------ - -- -- -----
_______ CQEEN 1) **DIST BLOCK N **REVIEW N ** PROJECT DATA ** PREVIOUS TOTAL= $309 353.82 (SCREEN 1)
INOATE: 21JUL92:16:48 34 PROJI. MANAGER: T. ALVAREZ MILES 0.530 SIS/YR 99
PROJECT NO.: 87060-3560 � �. � l 3
A
T1F��C��. SECTION: RSI SEQ NUMBER: 05' WPI NO. 6113777 i-
ll
PROPOSED LANES: -A CATION: R MEDIAN: U ..,
EXISTING LANES: 4 R/W LEFT: 0..000 R/W RIGHT: 0.000 -- --- 0
PROJECT DESCRIPTION: 71 ST FROM COLLINS AVE TO BAY DRIVEGO
COMMENTS : "el p
la
i FACTOR/EARTHWORK *#************* ************-*****
MOBILIZATION 10.000 MAIN` TRAFFIC 10.000 DRAINAGE . 1.000 9
BORROW ITEM 120 2` 2 CL E GP, ITEM ,..�.........'�/A ,.•. CC
��+K I TFM �_fl1 REI ...PIT AC. - U..
MSA«. ID
0 RET .PIT_EA_ .: � _ 0.000 _
*****************Tc******T******** SHQUL�7FR DATA *********************************
TOT WIDTH LT 0.000 TOT WIDTH RT 0.000 14
14
AVE WIDTH LT 0.000 PAVE WIDTH RT 0.000 is
RASA--_ITEM _. BASE THICK 0.000
CURS
SURF I TEM NO. T SURF THICK160.000
B ITEM _ N/A CURB WIDTH. LT 0.000 CURS :IDTH RT 0.000 17El
SOD WIDTH LT ClaZO SOO I DTH RT 0.00
0 M
(SCREEN 2) ****************T************************ W WIDTH RT . 0.000 •
ROADb+�AY DATA ****#��#**#_ Shi WIDTH LT 0.000 ���*��#�* REEN o
RD WIDTH LT 30.000 RD WIDTH RT 30.000
STAB ITEM __ N/A __ LEVEL ITEM 333 2 9 LEVEL THK 0.000rfi PSI
EM.UL. ITEM 3U0 I TACK ITEM 300 1 3
BASE ITEM _ NIA -
BASETHICK 0.000
..�
SURF ITEM 111 72O
000 ,
FiC ITEM 337 1 _
2 DRIVEWAY/RES. DRIVEWAY/COM• m
f � _0.000 0.000
W/WICTH LT 0.000 WI IDTH:. R ' 0.000
W/BASE ITEM T- - 10
W/THICK 0.
10
` EDGE STRIPE T 0 � _ _-
• ******** =************************* MEDIAN DATA *********************************
0.000 MED SOD LT 0.000 MED SOD RT 0.000
M CURB ITEM LM --- A MED CURB LT 0.000 -- --- iii
RM SHLD WIDTH 0.000 ni
SIGNING -
IGHTI
r
**** ** .QST PER SIL E _ 15Do0�000 LIGHTING COST LS 0.000
__--. SCFE * **** �
( _N 3) ************* X-ITEM / EX-ITEM NUMBERS ******************************* (SCP c'--'T 3) -----
X-ITEM 327 70 5 X-QTY 18656.000 X--ITEM X-QTY 0.000
X-ITEM X-QTY 0.000 X-ITEM X-QTY 0.000
X ITFM X-QTY... 0.R. U X- T M X-QTY _ _0,000 CO
EX-ITEM 110 EX-QTY 49 5.000 EX-UNIT PRICE 9-.00I3
Ex-IT520 .1 10 EX--QTY 5597.000 EX-UNIT PRIC9.000 CO
EX-ITEM 522 1 EX-QTY 3109
C�00 EX UNIT PRICE 15000
X I T M h31
$ 0 2 101 FX-QTY 24.000 EX-UNIT PRICE 350.000
EX-ITEM EX-QTY MI
Q 0.000 EX-UNIT PRICE 0.000 nil
-- *********************************** BRIDGES ************************************
TYPE NUMBER LENGTH 0.000 WIDTH 0.000 FACTOR 0.000
TYPE -- NUMBER LENGTH 0.000 WIDTH 0.000 FACTOR_ 0.000
TYPE NUBER LENGTH 0.000 WIDTH 0.000 - --- _-- _--
. TYPENUMBERLENGTH 0.000 WI DTH
-TAMA U� ��-x.00(} ---- -..� - �
TYPE L�.
0.900 FAC OR 0.000
NUMBER LENGTH 0.000 WIDTH 0.000 FACTOR R
**************-*********** INTERCHANGES OR GRADE SEPERATIONS ************* ,0.000li
**
il
INTERCHAOGEJGRADE EPERATT T -TYP , - _ �� - -
��� SER. � o.�-o�.
INTERCHANGE/GRADE SEPERATIDN TYPE NUMBER FACTOR 0.000 _____PAGE
INTERCHANGE/GRACE SEPERATIth TYPE NUMBER FACTOR 0.000 PAGE 13-16 55
•
- _ - - .61
58
'FA''`'T_ LAT` _: -1,JLL 92 ---- - — — 34
_STAT': i.OF- FLU'UOA LPART'�IENT OF rR,AISPo CATION PU VI;1US UPDATE: : 9 ' .� 9 .
ESTIMATES OFFICE - ----,_---2 — - -
�,���r E�I��'� �ll P��1` ��STI�:�, .- , -------
LCNC RANGE ESTIMATE FISCAL YR. 1993
_ fUJTPU I DATA
IJECT MANAGER • T. ALVAREZ - . . _. I
')JECT DESCRIPTION71 'ST FRU COLLINSC3LLNS AVE TO A DRIVE W.P.I.N0. • 6113777 fIMENTS
NP. TYPICAL SECTION SEQUENCE NO. EXISTINGLANESCD
_ PROPOSEC LANESQ7AC�rIAY LENGTH �,,, 11-
)JUCT
)60-3560 RSU(RESUAFACING UNDIVIDED MEDIAN 0
0 4 4 0.53i7 .`
_______________ r.►rM.My►MMr►-1yw--____T-----w--
CALCUL `E. ._d t
MI
- - - w - 4 COUNT li
FM ITEM QUANTITY UNIT COSTSI
14
BER NAME PRICE COUNTY DISTRICT STATE COUNTY DISTRICT ,s
i+iit+.sraraamss ara as.sa.is .sr+awaais:w swQitiaii+ai aia:ws— —w+—r.► v.sy+v+w++w_+ ...... _ ..r..r / -
—__ 16
7
SIGNING 1.000 $7,950•00 $7,950.00 • • 4. • • g
� 4 _ --- XX I TEM1 4,975.000
$9.00 $44,775.00 • • _ ,U
VI
1 3 TACKITM 1 ,865.578 X0.95 $1,772.30 $0.95 $0.97 $0•92FS
41' 70 5 �I � ... .... - _ 54 �
T .M� 14,656.000 $0.71 $13,245.76 $0•71 $0..71 $0.60 5 5 m
72 10 SUR ITEM 18,656.000 $1•61 $601
072 32 $ m
1 2 FCITEM 19,656.000 10.96 $17,909.76 $0.78 $0.78ID
.7f3 X0.96 1
.. . 1 1 0 XX I TE M2 5,597.000 $9.00 $50,373.00 $6.93 - $6.95 $6.75 35 40 F31
1 XXITEM3 3,109,0000 $35.£1 $4633
,�►35.00 ; $13 3 $13.6TT 114.13 3 38 33
2101 XXITE24, u0 $ 5 . 0 $$,400.00 •
I •
+ ia f r
1 CENTRSTR 1.590 t403.92 *642.23 $403.92 408 1 1.6
I .4 $4 31.11 �'T 3 .,
R 61 EDGESTRP 1.060 $1,593.34 $1,688.94 $1, 593.34 $1,609.06 $1 192 02 39
7 39
211.
CB
,3
,5
121
--------- ------
,:3
PAGE 14-16 54'
__ _______ __
i m
•
5a
...
. .
RRENT___DATE :21JULY2 3 I A I F LIF_.1-IL3R 1 r Al2.E.P A R T21...-L4TLiF_ .12,-V%S k n P.T 1 T I ON P4EVIO UPDATF : _ 21_JUL92 : 16:48: 34
hSTIMATES OFFICE / ENCINCE.UNG SUPPORT SERVICFS \
LONG RANGE FSTIMATL FISCAL YR. 1 'iT3
OUTPUT DATA
)
dJECT MANAGER --: Y. ---ALVARE.7.. .--- L
9JECT OESCRIPTIO4 : 71 ST FROM COLLINS AVE TO BAY DRIVE W.P. I.NO. : 6113777 0 -
MMENTS : I,- i 1
_
____ _ • ri li
li
rJJECT NO. TYPICAL SECTION SEQUENCE NO. EXISTING LANES PROPOSED LANES ROADWAY LENGTH
li
060-3560 RSU(REURFACING UNDIVIDED MEDIAN ) 05 4 4- U.-530 - - - - 9
IE-.
SI •
iRAINAGE COSTS = t101600.00 (SECTION NO. 03. ) 14
is
16
17
in
SECTION 05 TOTAL ROADWAY ITEMS = $264,064.31 El
. .
SECTION NO. 05 TOTAL IIRIrY;E COSTS = $0.00 rili
la
EC
• MAINTENANCE OF TRAFFIC = $26/406.43
Fil
MOBILIZATION = $29/047.07
33
TOTAL COST OF SECTION NO. 05 = . $319/517.82 It
. M
--
, — — -- 36
37
M2
39
4
- -
I
,9
PAGE
-------------- II
•
•
_...
50
5'
15-16
El
. -
. i
58
-
_,_.-T:;1-747:A . , 1 zI t- r: _ A l—r , P �'"W I J 1 J 3 c : ?1,111_92.11: : t
----0----T.4-,W S I�' �_ J- ._ r-:Z I ti. J ; 7 r F.•i It-r:�- - ..------- J F 1 r .=- �+F3' j
LON 7.4^.6 STI"IA T,± FISCAL YR. 1993
fUTPU T OA T1\
1JFCT t A\AG[P. : T. ALVAREZ--- . -. -- _----- ------
_
-- -- —
- — {'1J DESCRIPTION - 71 ST FROM COLLINS AVE TO klAY DRIVE' .P. I. D. : vli3T7 -" MENT5 til --t
- g.
-- -5JFCT N . TYPICAL SECTION SFU_ JC[ V.I. EXISTING LANES PROPOSED
LANES ROADWAY LENGTd f 5_
0-40-3560 RSU(RESURFACING .UNDIVIDED EDIA 3
,;kr.wa wm r Ptr,'f I CT-+- ritU= 3 x.1 r�.
�t
13
, FGUL.� ? ITt MS =
$11091,434.25
t44
TAAIMAGE. COSTS = ,161
-11771
$49,960.00
la
. �OAr-WAY C r)STS = - ---- ��,�
. 1,14114 +4.25 1_��
--_
124
• JOB TOTAL BRIDGES, COSTS =+ --- -- ----- - -
_
L
Fa
12 7
1AI�lTFNA�l,f E c7 F= TRAFFIC = - --- - --- - �_�
$114.1144.42
. 415ILIZATIONV = 11251558.37 . is. ... .... : _ _____________43-4,
NJ
litlj--- ---- ----------- 1,38
' ? 137060 35bfl T' T L 1 147
� �5�
� 1�3 3 .
, 1:!21
, I
. . _____ _ . ___p
ri E.
------- ---- -- ---- ..2-7
..
-. .
_.J
PAGE 16-16 -,-
__ ic.:]
r
t--1
1 )N()1 )() .11_)S11 r-
DI 1
'-1
`\�1.II;IIIIIflllll1111iI?,
all___.
NOI--?TIi
S I ---,... .�
-I oR
E
Mill!! iniimilllllllllillllllillllltiuntio 1111,111111111.1111 = 2 ■•s
�IIIIIIIIIIIIIIIIIIIIIIIIIIIIIiIIIIIIIIIIIII1miliIIII 1"""11111111""" _ —II-
14
PUBI_JIC A Fi\. _
.,REV �I
:ItwiI !lllll illllli � :11 3 111•..-
DISTRICT #1_
'; _111111111111111111: E ==;to
,�i ig .1111111111111111IP4 ••
1111111111111111: %
� IIII11111111111r • ♦QED rin
�‘%%d� 11111111;111/ $ •• ii
--1 1111111111111111111111 ' 111111��.il �: ::::::: '
1III► ,� � � .
��� 111111 11111111 .11i��1 ,..iiiii iiiiiiniiuniuiiiiiiuIII1111111111111111111111111111111F ____
��I ft lllfluIITl fflTh II I I I I I I I Il I I I S
� / t!Iii
�� ,_.-.6-gird
FT" _; _
(IflunTIrrj1TI1iIII1)C11ll1I1 �L� _� - i ev En w
4, 412 ,., %- , .... .... au ea im am
.•#111.3 =c r•E li..... P.r..11.1"-P-M"
� ='_ ==== = 75TH ST
1`1111111 Iiilllllllllilllll IIIIII hIIUll/�j _::: =l"E• ; •.-
1�� sisisii �1�1111�1111111111 1I1111�111i inie I =_ -- .,,,
���� ,���oho�oissin 111111111.'1111111 11111111111111�r��-�I����� rn__ini H®1�1i m:7.4!.•.•.
‘ 0 j‘V 10 To :..A/
RUE NOTRE DAMEos‘ '" rig:
4.•. ���%011111111Ik♦ :. 71 •.•••••••.•.•.•.
, Ar ♦� /1
,, `
\\\‘\\"1111111111*
� r • - �� -..•..•••AL �� • 4 1111 1111... /.. Q_— __. ...
. tit" tt‘10 0" • %.‘‘'''':•••••••***:'......... ... ..•....•.•.....•....'..............•... , 71ST ST
t%
rIsseit's t%ottotif 111111111111110 1%\111. #0 00;‘..‘...*%':•:•-:•!*::•::•,',:':•:'.1.•.:*::::::::-..7.;• ••:. ..'11:-.**••!•••••*.!•••••.;:.::_,_.•:1::::.%:::....:7.:.i.i::::
xr.
==r.. ...- it
.:
111111 11111110111M° �t1��� �����` ���•f•�•'' ,.,•..•.....•,.•,•,•••. __ "--;
-- - •••••••
�((��111 111�� ‘ `����������.':••:.•:,.•,,..•�'•.,::•'� i� - _'..••••••Ull-P" I • `�♦ �� �� .. in"I ..111► t ♦ 1i 111 ft is::; :�:�I1111�11111111111 .. �• •� so, �� ; ����11ti11 , .
0 ,� 1111111111•: • 0%♦ 1, 0.70 ``�t�.0♦ �tows 111111111111 i. ._ .::,:;:....::::
•�► `•moi • �� �\‘‘ % �‘ � ♦%‘ �1 1111. 111111111111 Q-- •••••••
��� �r�i 1161111111 /111111111: '�� ♦♦`‘% ���♦♦` �tO i " ,0311111111111111, �..• .....
♦ i� ° X11111111111111111111• • � �
c:::::.......:•:•:.
e** • �o h 11111 .I 1111 111 ♦ `�♦♦♦♦�♦... .%%to . �• ��•��t•,�& vi `�a 11 E 21;:::::::::::::::
. nv 1,,'mil mow° - •
F`ritl i 1 Ilii j11111`itl" �0��,�`�- ,�� is: : ;' : ::
/ /Is /IN/// i 111l11111111ii i gm. IMIIIIIIMIllis �1��ow o• ��� III =: :::::::::
APAla r......../............
imi we ioni::!:•::::::
• dia as a" in Iffi..;:i..1::.::::::i
_ A it••1111 in fs SI s
. gat:fil Ill firi a 2 'X
/Lk ass 07,ma ell iii ig % ..................
••us.as.8 ii.e.•:•..:-..:.
11 .............x...
pi es is- al aiii gil. ft..:.:.!•:.'•:.*.•
111111111 A*
rom
�•foe r r„................
I !:::1.:•:::•.%
N ciiTals „„,., ir
... .. ....
i "****.***.**.
fa 8:•:•,...:;:-..;•
, e lira ell 001
V ./ �•.••. -:•:• 63RD ST
•` A It r .. �..
h.
Illustration Depicting a Portion of the Capital Imp
CI
NEW PEDESTRIAN WALK - GRANITE SQUARES irl
:('' kil
. 4,0,94,4+
:k4064:4/4,
�, c1
EXISTING 'I HEDGE ' 4 ,1 —.) - / 0 .
Le
RUE ,'' ,0 ` A44(.'
o --
L----
t i
ENDOM -16 A' Afmi,, .i� GRANITE SQUARE BASE
II WITH NEW WROUGHT IRON
i�� ' ,v ii\J \ni AND WOOD BENCHES NEW
. ' PEDESTRIAN
t,, NEW PINK / WALKS-GRANITE
` TINTED X11` 4 SQUARES
SIDEWALKSft\",``, ���' •
I 1,-) %'__ I att
' el 4,110V-*1* ..t. s, \ 1',4:-- _
. i N_ ii Nik Cif E. iroi .•: „ .•=,; .‘,4.,,e04:,.,
io, ,vg...,,, --, ''';';-;•A',,,E -; 4, . . . 1
,...0,,
, 1 .
- "wl--1-g- P-ii •,‘ -, _ __I
/Wks ' ‘ 4 vi :10;311 1
a 17‘ )7EXISTIN HEDGE PARKING 1 .
ap NEW PEDESTRIAN WALK NEW PEDESTRIAN WALK
,a GRANITE SQUARE GRANITE SQUARE
1st STREET
A
b NEW PALM TREES AND NEW TRASH RECEPTICALS
- - GRATES-BRICK SIDEWALKS THROUGHOUT ,r
_ ( ' _ _
ff .
. . I .
...
CURB AND SIDEWALK COCONUT PALMS PLACED AS TO NOT
EXTENTIONS WITH SIGNATURE OBSTRUCT VIEW OF STOREFRONTS
SHADE TREES
1 t 1
•
TREES PRUNED FROM SIDEWALK 6'
ammampre7immill (--- -.)
_ __ti __ ) __
f31:1 .-,-t.,i,...0 L - i i / 7;1.
LL ---t-‘-).1
__ - 7 --_-'7 -"'' P.
1 11r�1 VL lc iUuiTht
ili
, ,
7.......... __
______ii :
_____I
i ,
. .
i i
i i ::::::::::::
`, -
-�/ r
• moi • -,- 42 TREE GRATE____________.......... 4::-.
- ____.
WASTE
CHANGE TO WIDER SIDEWALKS WHERE NEEDED
NEWSPAPER
BOX
COLLINS AVENUE - Typical street-level improvement
7----"Yrsl-k.7) ,
-
1
. - a 1
7--) ,-, .
, ,.)
,„ t, ,._
telA. #1:r.,-... ,.:- ...;:s
11 . ..,I
,
,. L .
I
I fl, 11
r
COLLINS AVENUE - Proper spacing of street canopy trees anddestria - lighting.
n ltrel
174
OA1UIARL
RESOLUTION NO. 92-20686
Authorizing the Mayor and City Clerk to
execute a Local Government Reimbursement
Program Joint Participation Agreement with
the State of Florida Department of
Transportation pertaining to the North
Beach Streetscape Improvement Project.
moo