CONTRACT
THIS CONTRACT ("Contract") is made and entered into as of theeday of Drcr--neoi9,
by and between the City of Miami Beach, Florida, a municipal corporation (the "City") and
Team Contracting, Inc. (the "Contractor"):
WTTNESSETH,that the Contractor,for and in consideration of the payments hereinafter specified
and agreed to be made by the City, hereby covenants and agrees to furnish arid deliver all the
materials required, to do and perform all the work and labor, in a.satisfactory and workmanlike
manner, required to complete this Contract within the time specified, in strict and entire conformity
with the Plans, Specifications, and other Contract Documents, which are hereby incorporated into
this Contract by reference, for:
ITB No. and Title: 2019-257-KB JOB ORDER CONTRACTING SERVICES-VARIOUS
TRADES
The Contractor agrees to make payment of all proper charges for labor and materials required in
the aforementioned work, and to defend, indemnify and save harmless City, and their respective
officers and employees, from liabilities, damages, losses and costs including, but not limited to,
reasonable attorney's fees, to the extent caused by the negligence, recklessness, or intentional
wrongful misconduct of Contractor and persons employed or utilized by Contractor in the
performance of this Contract.
The requirements of the Contract Documents, as such term is defined in the Invitation to Bid, are
hereby incorporated by reference as if fully set forth herein. This Contract is part of, and
incorporated in, the Contract Documents as defined herein. Accordingly, all of the documents
incorporated by the Contract Documents shall govern this Project.
The Contract is an indefinite-quantity contract for construction work and services.
The Contractor shall perform all work required, necessary, proper for or incidental to completing
the Detailed Scope of Work called for in each individual Job Order issued pursuant to this Contract
for the Unit Prices set forth in the Construction Task Catalog® and the following Adjustment
Factors:
Normal Working Hours Adjustment Factor: means the hours contained in the applicable noise
ordinance, and in the event there is no applicable noise ordinance, means the hours from 7:00
a.m. to 4:00 p.m. Monday through Friday, except for City Holidays:
General Construction: 1.0894
Other Than Normal Working Hours Adjustment Factor: means the hours outside the
applicable noise ordinance, and in the event there is no applicable noise ordinance, means the
hours of 4:01 p.m. to 6:59 a.m. Monday through Friday and all day Saturday;Sunday, and City
Holidays:
General Construction: 1.1044
Partial and Final Payments will be made as provided for in the Contract Documents.
1
Whenever either party desires to give notice to the other, such notice must be in writing, sent by
certified United States Mail, postage prepaid, return receipt requested, or by hand-delivery with a
request for a written receipt of acknowledgment of delivery, addressed to the party for whom it is
intended at the place last specified.
The place for giving notice shall remain the same as set forth herein, unless such notice
information is revised in a Contract amendment duly executed by the City and the
Contractor. For the present, the parties designate the'following:
For City:
Procurement Department
755 Meridian Avenue 3rd Floor
Miami Beach, FL 33139
Attn: Alex Denis
•
With copies to:
City Attorney
City of Miami Beach
1700 Convention Center Drive
Miami Beach, Florida 33139
For Contractor:
13911 SW 42nd Street
Suite 209
Miami, FL 33175
Attn: Daniel Gell
•
2
IN WITNESS WHEREOF, the above parties have caused this Contract to be executed by their
appropriate officials as of the date first above written.
ATTEST: CITY OF MIAMI BEACH, FLORIDA
7-2S
1.24‘ ‘, \ B C.--4 4"iii
kt1 ----7--.-' %
Rafael E. Granado, City Cler 7, Dan Gelber, Mayor
-
,<<c -
e":-:c.,:,.v...**. ve) "'... ,
c:-/.,...-..: ...° 'S,•:\,A,i ....):,---:-.. ."-
[seal] ,
il -: 7-----./u. ..1_,_-_,;,:: P'• A
i "',:. .. kI•\, ,UVA i (0, /
k 4
ATTEST: ' ..-1,. *V .TBAIVICONTRACTING, INC.
Vs '1",;*•.. c-7-- ..•' \N 27'
, .-,,,,, ,....°••......\-° ,..,-, ,,...-;,,
'>-
.7.1....................ci
By: a1 ,.. 1 GAI
Name: ADI/01.6 L. 41a0i Name: -b0Ani-t\ Gt.,
111\44
/
[seal]
APPROVED AS TO
FORM & LANGUAGE
&FOR EXECUTION
f
c........
e
City Attoey.gist p Date
: • :
•
3
.
1j3,. ::-, :,:i..;i:A:,....,-.1n.rf-: i;,1 !-•t.R.2.,.i.-Drti 0.k111-i?. ...t.-~*,:: ,;.,. . . . ' _.., f.:z.f.-4,..#it,,7:-L.i.,;=,:a:ilf; .::::-..t
ATTACHMENT A
COMMISSION MEMORANDUM
Competitive Bid Reports-C2 D
MIAMI BEACH
COMMISSION MEMORANDUM
TO: Honorable Mayor and Members of the City Commission •
FROM: Jimmy L. Morales, City Manager
DATE: October 16, 2019
SUBJECT: REQUEST FOR APPROVAL TO AWARD A CONTRACT PURSUANT TO INVITATION TO BID
(ITB)NO. 2019-257-KB FOR JOB ORDER CONTRACTING SERVICES -VARIOUS TRADES.
RECOMMENDATION
The Administration recommends that the Mayor and City Commission of the City of Miami Beach, Florida approve the City Manager's
recommendation pertaining to the bids received,pursuant to ITB 2019-257-KB,for Job Order Contracting Services-Various Trades.
ANALYSIS
On November 14,2018,the Mayor and City Commission approved a recommendation by the Finance Committee recommendation
to streamline construction related procurement by implementing a Job Order Contracting (JOC)program.The main purpose of the
JOC program is to expedite the delivery of construction projects through pre-established contracts. Locally,the JOC construction
delivery method is successfully being utilized by the City of Miami, Miami-Dade County Public Schools, and the Jackson Health
System.
JOC is a project delivery method utilized by many public sector organizations to expedite routine construction projects by establishing
a pool of pre-qualified contractors that can quickly respond to an agency's needs for construction services.JOC is most commonly
used to address deferred maintenance backlog,complete renovation projects,and expedite projects that require a rapid response.A
Job Order Contract is a competitively bid,fixed price, multi-year construction contract based on established or published unit prices
via a unit price book usually developed by an independent third-party(the City utilizes the Gordian Group system as detailed below),
often referred to as a construction task catalog (CTC), with a competitively bid multiplier applied to the unit prices.The City has
contracted with the Gordian Group,the largest JOC program software provider in the United States,to develop the CTC and provide
the supporting software system for the City's JOC program.The Gordian Group,which owns RS Means,manages a research-based
CTC which includes pricing adjusted for accuracy within each local area in which it is deployed.
According to the Job Order Contracting Association, an industry group that promotes best practices, education and credentialing in
JOC programs to the construction industry,the benefits of JOC contracts includes:
• more projects completed on-time and on-budget through collaborative information sharing,detailed project scopes,and proven
processes to speed project delivery;
• enhanced cost visibility through standardized construction task catalogs;
• enhanced contractor performance through long-term agency-contractor relationships as JOC contracts are multi-year based on
contractor performance;
• reduced deferred maintenance backlog;
• fewer change orders as better communication improves project scope development and yields elimination of contractor-driven
change orders;
• transparency as each project cost is developed via pre-determined unit prices yielding full transparency.
In order to select contractors for the JOC program in the areas of general construction, horizontal right-of-way (ROW), electrical
construction, roofing, and landscaping, the administration developed Invitation to Bid (ITB) 2019-257-KB. The ITB requires each
bidder to submit the multiplier that will be applied to the unit prices in the CTC.The multiplier includes the contractor's overhead costs
and profit.The ITB also considered licensure,experience and past performance.
ITB PROCESS
ITB No.2019-257-KB for Job Order Contracting Services-Various Trades,was issued on May 14,2019,with a bid opening date of
June 19, 2019. The City received 34 bids in response to the ITB from the following 30 firms (some firms submitted bids for more
than one trade)for a variety of trades,as indicated below.See Attachment A.
Electrical
South Florida Electric Consultant Edd Helms Electric
AGC Electric Solares Electrical
General Construction
•
Lee Construction Group, Inc. Shiff Construction
G.E.C.Associates Richport Construction Group
Harbour Construction .Delcons
Stone Concept Miami Waypoint Construction
Team Contracting, Inc Johnson-Laux
Danz Contracting Critical Path Services
Horizontal(Right-of-Way)
Harbour Construction Terra Hyle
Envirowaste The Stout Group
Maggolc, Inc. Southern Underground
Metro Express, Inc. Lanzo Construction Co.,Florida
Danz Contracting Ranger Construction Industries,Inc.
Ric-Man Construction Ric-Man International
David Mancini&Sons
Seawalls
Shoreline Foundation Keams Construction Company
Danz Contracting
Roofing
Advanced Roofing Richport Construction Group
Staff has verified that all bidders met the licensure and technical requirements of the ITB. However,a number of issues pertaining to
the bids received by Richport Construction Group,Stone Concept Miami, Inc.,and Shoreline Foundation are noted below.
Richport Construction Group
A principal of the Richport Construction Group was an employee of the City until December 2018. Section 2.111(q) of the Miami-
Dade Ethics Commission's Ethics Code, commonly referred to as the two-year rule,prohibits former local government employees
from lobbying their former County or municipal employer for two years following the termination of their employment. Further,the City
Attorneys Office has determined that the actions required to obtain a contract from the City,as part of the City's solicitation process,
are considered lobbying and are, therefore, violations of the two-year rule.As a result, the City may not accept a bid from Richport
Construction Group and may not consider the firm for award and the bid must be rejected.
Stone Concept Miami.Inc
Stone Concept Miami,Inc.was awarded a contract pursuant to ITB 2018-294-ZD,for window replacements at the Miami City Ballet.
The Property Management Department, which manages this contract, has reported significant performance failures by Stone
Concept Miami. On July 1, 2019, the City issued a notice-to-cure to Stone Concept Miami, Inc. for failure to perform work in
accordance to contract documents pursuant to the Miami City Ballet Exterior Doors and Windows Replacement project.
Subsequently, on September 6, 2019 the contract with Stone Concept Miami was terminated. As a result, the administration
recommends that no bids from Stone Concept Miami,Inc.be considered.
Shoreline Foundation.Inc,
In October 2018,on a project at the Port of Miami, Shoreline was convicted of invoicing the US Coast Guard for work required but
not completed on the project. Shoreline Foundation, Inc. has claimed that the work was to be performed by one of its subcontractor
and that it was unaware that the subcontractor had not completed the work. However, Shoreline Foundation, Inc. has also
acknowledged that it is ultimately responsible for the actions of its subcontractors and has accepted responsibility for this matter.The
U.S. Department of Homeland Security, in investigating the issues with the Port of Miami project did fine Shoreline but did not
recommend debarment.The State of Florida,Department of Management Services,has also investigated the issue and has taken no
action in the matter. However, the Florida Department of Transportation (FDOT) has entered into an agreement with Shoreline
Foundation, Inc. in which the firm voluntarily has agreed to not bid on any project or work as a subcontractor or materials supplier on
any FDOT project through May 31,2020.Following this moratorium,Shoreline will be eligible to bid on FDOT projects.
CONCLUSION
I have reviewed the bids received pursuant to the ITB,as well staff's due diligence and analysis. I agree that it is important to proceed
expeditiously with the JOC program to help expedite a number of projects, including G.O. Bond projects, while adhering to cost
controls and incentivizing contractor performance.In determining an award recommendation, I note that the City code requires that, in
addition to price,the following factors must be considered:
(1) The ability,capacity and skill of the bidder to perform the contract.
( ) Whether the bidder can perform the contract within the time specified,without delay or interference.
(3) The character,integrity,reputation,judgment,experience and efficiency of the bidder.
(4) The quality of performance of previous contracts.
(5) The previous and existing compliance by the bidder with laws and ordinances relating to the contract.
With regard to the bid received from the Richport Construction Group, I concur with the interpretation of the City Attorney's Office
regarding the Miami-Dade County Ethics Commission Code two-year rule restriction.Therefore, I recommend that the bid received
from Pirhnnrt(.nnctn irtinn nrrn in ha raiartar♦
With regard to the matter of Stone Concepts Miami, Inc.'s performance on a current City\contract, it is my•position that City
contractors that have not satisfactorily performed on their contract obligations should not be considered for further awards.Therefore,
I recommend that the bid received from Stone Concepts Miami be rejected.
With regard to the matter of Shoreline Foundation moratorium agreement with FDOT,Shoreline has notified the City Attorney's Office
that it is in agreement that the City will award no work until such time as it has been determined to be in good standing with FDOT.
While I acknowledge the seriousness of the issues at the Port of Miami project, I also understand that the Department of Homeland
Security has investigated this matter and recommended that Shoreline not be debarred. Further, the State of Florida has also
investigated the matter and has not recommended any further action. Finally, FDOT has agreed to allow Shoreline to participate in its
procurement projects following the conclusion of the voluntary agreement. In considering this matter, I must also consider the City's
current and future needs regarding seawalls and the need to have sufficient contractors to expeditiously complete this work.Shoreline •
is one of three contractors that has submitted a bid in response to the ITB and, it is important to note,has submitted the lowest cost
multiplier for this category of work.
Finally,while it is important to have sufficient contractors to complete City projects, having too many contractors tends to reduce the
amount of work any given contractor is awarded and,as a result,may reduce a contractors ability to deploy sufficient resources for the
awarded projects since the majority of JOC projects tend to be smaller in size.While the City is fortunate to have received so many
responses to the ITB,staff has analyzed the pending projects list for the next several years and has estimated how many contractors
would be required to complete the work for each category. If the number of projects increase in the future, there is always the
possibility of adding additional contractors to the JOC program.
Therefore, based on the aforementioned, I recommend that the Mayor and City Commission approve the award of the following
contractors pursuant to ITB 2019-257-KB for job order contracting services—various trades. In assigning work,the Administration will
endeavor to utilize the contractors with the lowest multipliers (see Attachment A), unless the contractor is not in compliance with any
contract or performance requirement or it is otherwise in the City's best interest as determined by the City Manager. The
Administration will provide a monthly report to the City Commission of JOC projects awarded during the preceding month.
Electrical
South Florida Electric Consultant
AGC Electric
Edd Helms Electric
Solares Electrical
General Construction
Lee Construction Group, Inc.
G.E.C.Associates
Harbour Construction
Team Contracting,Inc.
Danz Contracting
Shiff Construction
Horizontal(Right-of-Way)
Harbour Construction
Envirowaste
Maggolc, Inc.
Metro Express,Inc.
Danz Contracting
Ric-Man Construction
David Mancini&Sons
Seawalls
Shoreline Foundation(only eligible for work once the voluntary no bid period with FDOT has ended)
Danz Construction
Keams Construction Company
Roofing
Advanced Roofing
Legislative Tracking
Procurement
ATTACHMENTS:
Description
o Attachment A
DIVISION TOTAL
Firm Name Trade ' DIVISION TOTAL Adjustment Factor for Total Base Bid
Adjustment Factor for "Other Than Normal
"Normal Working Hours" Working Hours"
South Florida Electric Consultant Electrical Construction 0.81584 0.20596 1.0218
AGC Electric Electrical Construction 0.8416 0.3156 1.1572
Edd Helms Electric ' Electrical Construction 0.9593 0.2657 1.2250
Solares Electrical Electrical Construction• 1.024 0.286 1.3100
Lee Construction Group,,Inc 4, ,z, „G;;?„General ConstructiWC„, \„ 14,1„„Mi„x;0 688 k;4;\V�',',„ p 3 r'z 4• ,,4,,'0 172 '; 0?rt 0 8600
.x ,e,r x ,t x,?4 a v 4 ,vva fid&\" .,,"er .sy ¢ v'v k v R� �v v. v a x
G.E.C.A5$S6. .4 .vS, ,o�v a i " ,vx? ,v„ ,N at,I ti 3 Uct'itoo w.., 6 v a i ,v" v„0.'6944 r�°ni t k x t vt p v
� i �; �. .� ,, �" , . t�,.,01,�;36 �;� ..kiw. a'0a'6'go
Harbour,Contuciof "a ' k C ' 'Generl�Constuction„ y <<1?, Y za5 ' n7 4 . 3 "T1".t0 ,ak� # 0 9
150
-�,..,. :.r, .,. ..i. .....� itis:,, .` � ��
... � i��i Yl�.i.,1, _ . .n k i , i� ��,. L-.� n.�crco .. L �f F`.< Int-.,`h:,8"444 {...'� V7?TJ,
Tear Contracting F.Ine .$, General Construction, , > .n i.V ,0:8715 X r ':0 2208 .{ :x,1.0923
Danz Contractin Gen` '
�,�,'�.v~ti`,�.;."}''a.��"... w'„ .� `"�CaI,COn51rUCtlO,nP;3.<t�F:kO,4,< Vtr 4.0,8784.4V,':%1'g"ai,",�'.0 225.'��°�x�,.P'�cv!� 1:1034;
Shift Construction r r c" we I ti e Pt4 waN `\\� ix" 3 \ \ ,1 a ic",s
��it��� a�:.A?.a! qa..R Q Gene.rai COnS1:rUG�iOnn'��,s a sx a$� � x v ax`'4""' \a§ 'Qgs96 �`�'�"?�'�8v r7'�.�x ks �" 0"26 ��. C x\\3' ,1,156 ,
+�wrw d Px
" . .E •....i�, ",�fax+�.�`. , . awkAs„x. @ ,a;0-"3, 0w34 0,mY, nagpO 2",t2i 5.ms1
Deleon;.,..}i."{F ;;,a, :5, .0.-',^, ".Gen `ral Constl'uctiorl.V tom' a' -kY aye,p eiV v ,x 'u'r".V it., aas �;;Y L+ x .x»a
;0:9496 ��,_. t„ , 0 2434 1.1930
Waypomt Construction`'i i ,,k Ax, General Construction a ; ,- 0 872 z t w '' zf , . 0 827 j .,y r '1 1990
Jol nson Laux� g'f y�`3t y `r.a', 4 . General Construction x^'"' M `'�� ` K
1084 �>� rt �„ .� ��i*279 igi1 3630;
x aw, ." vv �. ne xSH "' f'vn' " w w. s, kv rw v w , c" a
(,+'r(f�C2�?Q�`�1�$@C�/,ICH.+�ut T`,uv�.�3�iRxs�, "v\a �et1E?r���(�o„nS'��"UCL�O�'1�A St` v x �sv"R x i ,�•.�94.�v, x� d z k �,�,v �vv �'i�w, 'vV :,.,
. .. .. .xf, v��„�.� .,,, �,� ,,o�., .�.�.,�0 3,236 „x �,<,..�x„� .1,618`2
Harbour Construction Horizontal ROW 0.752 0.188 0.9400
Envirowaste Horizontal ROW 0.816 0.204 1.0200
Maggolc,Inc. Horizontal ROW 0.816 0.21 1.0260
Metro Express,Inc. Horizontal ROW 0.7984 0.236 1.0344
Danz Contracting Horizontal ROW 0.8388 0.2141 1.0529
Ric-Man Construction Horizontal ROW 0.852 0.217 1.0690
David Mancini&Sons Horizontal ROW 0.888 0.232 1.1200
Terra Hyle Horizontal ROW 0.896, 0.25 1.1460
The Stout GroupHorizontal ROW 0.9447 0.2362 1.1809
Southern Underground Horizontal ROW 0.944 0.238 1,1820
Lanzo Construction Co.,Florida Horizontal ROW 0.9484. 0.2441 1.1925
Ranger Construction Industries,Inc. Horizontal ROW , '1.136 0.304 1.4400
Ric-Man International Horizontal ROW 1.52 0.399 1.9190
Shoreline-Foundation '; Marine Construction =0 912 ° sr" 0.2346 ' i„ 1 1466
Danz.COntractmg M , .. 4, Marine CorLstructi iih: ,v .,: ,„,,, :70.9264,.r, .; ,, ; . ,_1,4.0 241 1 1674
a., ons .,rc , W x t'3 ,ti.. .ri. nstr i w a.L. trx ,. akv vx e 'tJ` -"> .. x;;,v
Kearns ConstructionwCompany."w._. , n Marine Construction,` :,v+5. 4'sg ,n,, ,;", .,-,072 ,a, „ .,,T„', ,. 29,2 �;,, , r,'::,136a0
Advanced Roofing Roofing 0.72 0.19 0.9100
Beefing 079434 0.2421 1.18x..
*Not recommended for award.
ATTACHMENT B
SOLICITATION ITB AND ADDENDUMS
•
MIAMIBEACH
City of Miami Beach, 1755 Meridian Avenue,3'd Floor,Miami Beach,Florida 33139,www.miamibeachf.gov
PROCUREMENT DEPARTMENT
Tel: 305-673-7490 Fax: 786-394.4002
ADDENDUM NO. 4
ITB 2019-257-KB
JOB ORDER CONTRACTING SERVICES—VARIOUS TRADES
June 13, 2019
This Addendum to the above-referenced ITB is issued in response to questions from prospective
proposers, or other clarifications and revisions issued by the City. The ITB is amended in the
following particulars only (deletions are shown by strikethrough and additions are underlined).
THE DEADLINE FOR QUESTIONS HAS PASSED AND NO FURTHER QUESTIONS WILL BE
CONSIDERED.
L ITB DUE DATE AND TIME. The deadline for the receipt of bids is extended until 3:00
p.m., on Wednesday, June 19, 2019.
City of Miami Beach
Procurement Department
1755 Meridian Avenue, 3rd Floor
Miami Beach, Florida 33139
Late proposals will not be accepted. Proposers are cautioned to plan sufficient time to
allow for traffic or other delays for which the Proposer is solely responsible.
IL RESPONSES TO QUESTIONS RECEIVED.
Q1: Non Pre-Price Adjustment Factor: At the pre-bid meeting they discussed adding a
line item to the bid tender form called Non Pre-Priced Items and saida new Bid Tender
Form would be sent in an addendum. I cannot find the new form. Can you please let me
know where to find this.
Al: A revised Bid Tender Form will not released. The Non Pre-Price Task Item
is not a Bid Factor. The standard allowance for non pre-priced items is 10%.
Please refer to the formula found on Pages 92-93, Section 3.4.3.3 for further
information.
Any questions regarding this Addendum should be submitted in writing to the Procurement
Department to the attention of the individual named below, with a copy to the City Clerk's Office at.
RafaelGranado@miainibeachfl.gov.
Proposers are reminded to acknowledge receipt of this addendum as part of your ITB submission.
1Prb,erenl d rement Director_
1 ADDENDUM ND:4
INVITATION TO BID(ITB)No.2019-257-KB
JOB ORDER CONTRACTING SERVICES—VARIOUS TRADES
MIAMI BEACH
City of Miami Beach, 1755 Meridian Avenue, 3'd Floor,Miami Beach,Florida 33139,www.miamibeachfl.gov
PROCUREMENT DEPARTMENT
Tel: 305-673-7490 Fax: 786-394-4002
•
ADDENDUM NO. 3
ITB 2019-257-KB
JOB ORDER CONTRACTING SERVICES—VARIOUS TRADES
June 7, 2019
This Addendum to the above-referenced ITB is issued in response to questions from prospective
proposers, or other clarifications and revisions issued by the City. The ITB is amended in the •
following particulars only(deletions are shown by strikethrough and additions are underlined).
THE DEADLINE FOR QUESTIONS HAS PASSED AND NO FURTHER QUESTIONS WILL BE
CONSIDERED. •
ATTACHMENT(S).
Exhibit A: Presentation by The Gordian Group at Pre-Bid Meeting
1I. REVISION(S).
1. The ITB Information & General Requirements, Project Description & Scope of Work
(Pg. 2) has been revised as follows:
Furnish all, labor, materials, equipment and supplies in order to provide Job Order
Contracting seryices to the City of Miami Beach, FL.
Prime Contract Opportunities Include:
- General Construction
- Horizontal Right-of-Way
- Electrical Construction
- Roofing
- Landscaping
- Marine Construction (seawalls, docks, etc.)
2. Appendix A, Part C, No. 2 has been revised as follows:
2. Provide three (3) similar projects that the applicant has
completed in the last five (5) years. Similar protects shall be defined proiects which
include the trade being applied for. .
3. Appendix A-2, Article 9, add the following, "If Builders Risk insurance is required for
a specific.Job Order, the cost of the insurance will be included in the Job Order Price
Proposal as a reimbursable task."
4. Appendix A-2, Article 3.7.4, add the following, "The self-performance percentage
shall apply to the organization's labor hours performed at the proiect site through the
working foreperson level. Superintendents and office staff do not apply to the self-
performance percentages."
1 ADDENDUM NO.3 •
INVITATION TO BID(ITB)No.2019-257-KB
JOB ORDER CONTRACTING SERVICES—VARIOUS TRADES
5. Appendix F, JOC Supplemental Conditions, Section 9, Cooperative Purchasing, has
been deleted in its entirerty.
6. The ITB Summary, ITB Information & General Requirements Requirements,
Procurement Contact (Pg. 2) has been revised as follows:
Name: Kristy Bada, Contracting Officer III
Telephone: 305-673.7000 Ext. 62218
Email: Kr-+sta.Bada kristybada@miamibeachfl.gov
HI. RESPONSES TO QUESTIONS RECEIVED.
Q1: In the ITB summary pages (Page 6/2019-257-KB to be exact)-The category ""TAB
C: BID Forms". Please advise if this should read "Tab D...." since Tab C already exists.
Al: Correct, it should read "Tab D."
Q2: Additionally, in,the sub-heading "1." Please advise if what is mentioned to be "Form
B3" should be "Form B2". If it is meant to'be "Form B3" please provide this paperwork.
A2: Correct, it should read "Form B2."
Q3: Sub-heading "2. Local Workforce Responsible Contractor Affidavit, Part A".-Please
provide this form.
A3: This form will be provided and required at time of Job Order, if applicable.
Q4: Sub-heading "2. Local Workforce Responsible Contractor Affidavit, Part A".-Please
provide this form.
A4: This form will be provided and required at time of Job Order, if applicable.
Q5: How many General Construction contracts does the city intend on awarding? .
A5: Unknown at this time. However, if it is deemed to be in the City best
interest, the goal is to award the majority of projects with a value up to $2
million through any resulting agreement(s).The City reserves the right to award
projects in excess of$2 million if it is deemed to be in the City's best interest.
Q6: Please confirm that surveying and as-builts are to be included in the factor.
A6: As-builts are to be included in the Adjustment Factors. Survey will be
added as needed on a project per project basis.
Q7: Please confirm that all testing will either be paid for by the city, or the city will provide
their own testing agency.
A7: The City will pay for any tests not included in the Technical Specifications.
Tests specified in the Technical Specifications are considered.to be part of the
Unit Prices. For example, the Technical Specification for cast-in-place
concrete requires tests for slump, air content, and compression.
2 ADDENDUM NO.3
INVITATION TO BID(ITB)No.2019-257-KB
JOB ORDER CONTRACTING SERVICES—VARIOUS TRADES
Q8: In Appendix F, JOC Supplemental Conditions, Section 9 Cooperative Purchasing
states "If the Contract is utilized by Entities, the contractor agrees to pay Gordian a
6.25% license fee (eZIQC Fee) due and payable within five days from the date the
Contractor receives payment from Entity." Is this fee to be included in our factor, or
would the 6.25% license,fee be added in addition to our factor should another entity
want to hire the contractor and use this contract?
A8: This section does not apply and has been deleted in its entirety.
Q9: On Page 6 of the ITB, it indicates that under Tab C we are to submit Appendix B
Form B3. Seems like a typo and should be Form B2. Please confirm or provide Form
B3 since there is no form in the ITB.
A9: Please refer to response A2 above.
Q10: On Page 6 of the ITB, it requires that we submit under Tab C the Local
Workforce Response Contractor Affidavit, Part A. I could not find it within the ITB.
Could you please provide.
A10: This form will be provided and required at time of Job Order, if applicable.
Q11: On Page 16 of the ITB, Appendix A, Part C, No. 2 requires residential renovation
project experience. As it relates to Horizontal Right of Way, there is no residential
experience. Also, we were unable to find any specific minimum requirements for the
Horizontal Right of Way Component of the JOC ITB? Traditionally, the City provides a
minimum of 5 years in business and having completed similar projects. However, we
can provide typical ROW projects; however, of what project size.
Al 1: Please refer to Revision 2 above.
Q12: It was discussed during the Pre-Bid, that Marine Construction was to be included
in either General Construction or Horizontal Right of Way. What do we need to provide
or include within our package to let the City know that we are interested in submitting
for this. What experience requirements.
Al2: Please refer to Revision 1 above.
Q13: On Page 21 of the ITB, Appendix A, Question 24— It is requesting that we provide
a listing of products that are to be sourced in North Caroline and Mississippi. Since this
is a JOC, we have no idea what project would be given to us. How do we respond to
this question? Please advise.
A13: Contractor only need advise if its direct firm services are being sourced
in North Carolina and Mississippi. No response is necessary regarding
products or subcontractors as that information is not known at the time of bid.
3 ADDENDUM NO.3 ,
INVITATION TO BID(ITB)No.2019-257-KB •
JOB ORDER CONTRACTING SERVICES—VARIOUS TRADES
Q14: Are the printed copies of the Task Catalog that were at the pre-bid meeting still
available to be picked up? The online pdf is locked, preventing printing and we would
prefer having a physical copy for our files.
A14: No. They are not available for pick up.Any Contractor awarded a Contract
may purchase a printed copy.
Q15: If awarded a contract...will we be billing through the Gordian software. If so, is the
software free or must we purchase it?
A15: Billing will be outside the Gordian software. Access to the Gordian Cloud
will be provided to Contractors awarded a Contract with the City. The cost of
the software in part of the 1%JOC System License Fee the awarded Contractor
is to pay on Job Orders issued. The 1% JOC System License is to be included
in the Adjustment Factors.
Q16: The bid package states a bid bond is not required. If awarded the contract, will
there be a performance and payment bond required? If so, how much would the contract
amount for bonding purposes be?
A16: A bid bond is not required at this time. However, a payment and
performance bond will be required, on a project by project basis, for job order
projects, on a project per project basis, in excess of$200,000.
Q17: Will there be separate JOC packages for each trade to bid on?
M7: If submitting a Bid for more than one trade, Bidders shall submit a
separate bid package for each trade being bid.
Q18: Where can we download the Construction Task Catalog?
A18: A copy will be uploaded to www.publicpurchase.com.
Q19:The Bid Documents state that there is no Bid Bond required to be submitted at the
time of bid. Is this correct?
A19: Please refer to response A16.
Q20: Will there be a Performance and Payment Bond Required to enter into Contract
with the City of Miami Beach? If so, what would be the bid bond amount?
A20: Please refer to response A16.
.
4 ADDENDUM NO.3
INVITATION TO BID(ITB)No.2019-257-KB
JOB ORDER CONTRACTING SERVICES—VARIOUS TRADES
Q21: Will there be separate bid packages for the different scopes stated in the ITB
(General Construction, Horizontal Right Of Way, Electrical, Roofing, and Landscaping)?
Right now the website shows only one generic package.
A21: If submitting a Bid for more than one trade, Bidders shall submit a
separate bid package for each trade being bid.
Q22: Will there be separate Construction Task Catalogs for the different scopes? Right
now the website shows only one generic package.
A22: All Contract trades will use the same Construction Task Catalog°.
Q23: Moreover;our firm has been trying for many years to enter the City of Miami Beach
market but the project have always been over$10,000,000 for the Horizon Right of Way
projects. We respectfully ask the City of Miami Beach to help smaller contractors which.
can perform projects between $0 to $7,000,000 to obtain work within the City as well. I
assure you that some of us bring plenty of value with our services.
A23:/Noted.
Q24: How many contracts will the City of Miami Beach be awarding for each trade
posted on the solicitation?
A24: See response to question 5.
Q25: Per the pre-bid conference, it was stated that a presentation that was presented
to the in-person attendees would be shared with all bidders. Please provide this
presentation.
A25: Please refer to Exhibit A.
Q26: In the past Builder Risk insurance was reimbursable. In the current bid it seems
to be included in the factor. Please clarify. If included in the factor, how are we to
determine which jobs will require builders risk and how much it will cost? Cost varies
by job depending on circumstances, location and building materials.
A26: Please refer to Revision 3 above.
Q27: Bid Form — Local Workforce Responsible Contractor Affidavit, Part A is not
included in bid forms. Can you please provide it.
A27: This form will be provided and required at time of Job Order, if
applicable.
5 " ADDENDUM NO.3
• INVITATION TO BID(ITB)No.2019-257-KB
JOB ORDER CONTRACTING SERVICES-VARIOUS TRADES
Q28: Page 16 of ITB question 2 asks to provide 3 residential renovation projects, can
we submit commercial renovation projects instead? Our company does not specialize
in residential work.
A28: This is an inadvertent error. Please refer to Revision 3 above.
Q29: Please clarify the 10% self-perform requirement for the "General Construction"
contract. Will project management, supervision, administration, etc. count towards this?
A29: Please refer to Revision 4 above.
Q30: There are two tabs listed as "Tab C." Should the last tab be identified as "Tab D?"
A30: Please refer to response Al above.
Q31: Please confirm that a bid bond is not required.
A31: Please refer to response A16 above.
Q32: Part C, item two is requesting three residential projects. Should this be commercial
projects?
A32: This is an inadvertent error. Please refer to Revision 3 above.
Q33: Itappears that the Contractor Affidavit, Part A is missing. Would you please
provide it?
A33: This form will be provided and required at time of Job Order, if
applicable.
Q34: I'm just following up on the substitution form I sent you, checking to see if Scranton
Products would be a qualified substitution.
A34: Since no projects, products, or contractors have been identified at the
moment Gordian cannot consider any product substitutions.
Any questions regarding this Addendum should be submitted in., writing to the Procurement
Department to the attention of the individual named below, with a copy to the City Clerk's Office at
RafaelGranadoc miamibeachfl.gov.
Proposers are reminded to acknowledge receipt of this addendum as part of your ITB submission.
Sincerely,
Alp
A -x Denis
Procurement Director
6 ADDENDUM NO.3
INVITATION TO BID(ITB)No.2019-257-KB
JOB ORDER CONTRACTING SERVICES—VARIOUS TRADES
Exhibit A:
Presentation by The Gordian Group
at Pre-Bid Meeting
•
7 ADDENDUM NO.3
INVITATION TO BID(ITB)No.2019-257-KB
JOB ORDER CONTRACTING SERVICES-VARIOUS TRADES •
G OR D IAN` MIAMIBEACH
.
Building knowledge
CITY OF MIAMI BEACH
JOB ORDER CONTRACTING SERVICES
INVITATION FOR BID
ITB No. 2019-257-KB
May 28, 2019
1
Pre-Proposal Conference Agenda
• JOC Overview
• The Contract Documents
• Contract Specifics
• Understanding the Construction Task Catalog® (CTC)
• Calculating the Adjustment Factors
• Completing the Bid Tender Form B1
• Considerations
• Review of Key Points
• Bid Submission
GORDIAN1
8 ? ADDENDUM NO.3
INVITATION TO BID(ITB)No.2019-257-KB
JOB ORDER CONTRACTING SERVICES—VARIOUS TRADES
JOC Overview
Definition • Indefinite delivery/indefinite quantity process (IDIQ)
• Enable contractors to complete a substantial number of
individual projects with a single bid
• Tasks based on competitively-bid, preset prices
Value • Saves time and money
• Provides transparency and auditability
GORDIAN'
JOC Overview:
Umbrella Contract
•
Part 1
Bidding the Umbrella Procuring individual
Job Order Contract .Projects From Owner
Owner Subcontracting
Owner Project A j Opportunities
Owner Contractors Awards
Advertises Submit Umbrella Owner Subcontracting
Job Order Bids Job Order Project B Opportunities
ContractContract
Owner Subcontracting
Project C Opportunities
GORDIAN'9
9 ADDENDUM NO.3
INVITATION TO BID(ITB)No.2019-257-KB
JOB ORDER CONTRACTING SERVICES—VARIOUS TRADES '
! .
JOC Overview:
Why JOC Works For Contractors
• Good work is rewarded with more work
• Profit is a function of volume
• Volume is driven'by performance
• JOC provides a steady flow of work.
• Win a.higher percentage of proposed projects
• Easier process for project proposals
• Long-term relationship with the City
• Good work is rewarded with more work
• Develop partnership with.the City
• Ability to leverage Subcontractor and Supplier relationships
• Ability to sell value, not just compete to be the lowest price
GORDIAN'
JOC Overview:
Why JOC Works For Contractors
• Reduced Risk
• Fixed prices
• No negotiations
• Payment for every element of work performed
• Ability to provide input during scope development
• Eliminates quibbling over change orders
• Reduced chance of claims
• Build bond.capacity
• Larger presence and enhanced reputation in the local community
GORDIAN'
AMIESEMEM
10 ADDENDUM NO.3 e
I INVITATION TO BID(ITB)No.2019-257-KB
JOB ORDER CONTRACTING SERVICES—VARIOUS TRADES
JOC Overview:
Why JOC Works For Facility Owners
• A Fixed Priced, Fast Track Procurement Process
• Job Orders are Lump Sum
• The Ability to Accomplish a Substantial Number of Individual Projects with a Single
Competitively Bid Contract
• Contractor Has A Continuing Financial Incentive To Provide
• Responsive Services
• Accurate Proposals
• Quality Work on Time
• Timely Close Out
• Future Purchase Orders Tied to Contractor Performance
• No Obligation To Award Specific Projects
• the City can Use All Other Methods For Accomplishing Projects
G iR D IAN'
JOC Overview:
Why JOC Works For Facility Owners
• Increases use of local subcontractors and local businesses
• The absence of pre-established quantities inhibits trade staffing by the prime.
contractor.
• Responsiveness requires the prime to use multiple local subcontractors.
• No bonding requirement for the sub,faster payment, and less red tape, thereby
expanding business opportunities for small businesses
• The City reviews and approves all Subcontractors prior to issuing Job Orders
• Increases Transparency
• The City Has the Ability to See and Review the Back-Up Pricing Details
• Schedule Flexibility
• No Shelf Life for Prices or Job Orders
• Fast procurement cycle is good for end of fiscal year projects
GORDIAN'
11 s ADDENDUM NO.3
INVITATION TO BID(ITB)No.2019-257-KB
JOB ORDER CONTRACTING SERVICES—VARIOUS TRADES
JOC Overview:
The JOC Process
•
1 2 3 4 ' 5
JoirrtScope Request for Proposal Proposal Issue Job
Meeting Proposal Development Review Order
•
•
GORDIAN'
The Contract Documents
• Invitation to Bid
- a • The Construction Task Catalog®
" • The Technical Specifications
GORDIAN'
12 ADDENDUM NO.3
INVITATION TO BID(ITB)No.2019-257-KB
JOB ORDER CONTRACTING SERVICES—VARIOUS TRADES
The Contract Documents
Invitation to Bid
• ITB Summary �_ n
• 0100: Instructions to Bidders
• 0200: Minimum Qualifications
• 0300: Bid Submittal Format _, „•�a,,_,,,-
• 0400:Terms and Conditions(Under Separate Cover) 734.410CISROIMMILIal▪ Appendix A:Contractor Pre-Qualification Form
• Appendix B: Bid Tender Form
• Appendix C:General Conditions for Job Order Contracts
• Appendix D:Contract
• Appendix E:JOC Instructions to Bidders
• Appendix F:JOC Supplemental Conditions
Gq3,RDIAN'
The Contract Documents
The Construction.Task Catalog®
• Catalog of Pre-Priced Construction Tasks r�'
1cD OrCa Contract
Con3rn can,Task Catalog•
• Organized by Construction Specifications Institute W' "
(CSI)
• Based on Local Labor, Material & Equipment Costs ,
• The tasks represent the "Scope of Work" for the :G ,
contract T
d • AA
- _ - I GORDIAN'
G€iRDIAN'
13 - ADDENDUM NO.3
INVITATION TO BID(ITB)No.2019-257-KB
JOB ORDER CONTRACTING SERVICES—VARIOUS TRADES
4
The Contract Documents
The Construction Task Catalog° GORDIRM YE.,91110 1.•••••••••ram cesa,,_
• Contractor must review and understand "Using the _ — -_ "� -'
Construction Task Catalog o - :��"
• Rules of the game -••�-4 - _�...,.
• 6 Make sure you get paid for all appropriate tasks ®_
• Pages 00— 1 to 00-6 of the CTCV—�
IMMO 0110110
GeriRDIAN'
The Contract Documents:
- Construction Task Catalog® -
- Exterior Im•rovements 32
•
Basin,Ballasts.And Pa 3210 ,�.� - _ .
UNt Paving 32 14 - -
-
IOU,CURER!Dtf.%UrNXI r _
' Csl Oct DesCOPTICIJ Usel RCB! Il.Arca.<r - - -
• CSI Full description 1 Price includes labor. Demofitron " .
Masters ormat of task material.equipment pace
for your location
32 16 Curbs,Gutters,Sidewalks,And Driveways..
321611 Curbs And Gm en..
• WOK neuls Mose t Don.0nuwnes no sap as l ,e•e)o UM.14C Ib male to to ma. m
. xvo 02411313004 aaaaa.Sne sm.anwe.Srs 100. Section+ ' -
• 32161313 Cast-4144a a Concrete Curbs And Gutters... °. - _
Me nOueem A.X.lam tins.durnotaenHmayy oar=.• ' task notes -
3216 t313-000 t Camas a Curb,Cast In Place.,e»..., ,
1ace-xnf,isdea!exoanen aeL Seodx.atmfai.ae'M'�an egmclui pas,r.el.av am; , ..
1215131=132 LI VS trGni elP.0 Cauc!e am_-- - -
fort, re 24 Me - - --—-_ 7m n1, 327 .. -
w.X1ie91.Aar Modifiers for 224 - -
- For A.60 ro wTo Lowcta2 variations oe�
Pr.000,is..,, discounts am
4.151311.71 LF 6.1tlrcmtnFuceGran,QC,RIMS_ �____-__.._.. _-a!D 312 .
Fo 01,712*Aee. 'im - - .
Fa Aar>7071,:04 AZee -
For.so rO Ma A1 Of
m
R.,.502 TO LOCO Maar .1 o1 - - .
Fore am Claw •1:2
GaRDIANr.
14 ADDENDUM NO.3
INVITATION TO BID(ITB)No.2019-257-KB
JOB ORDER CONTRACTING SERVICES—VARIOUS TRADES
The Contract Documents:
Construction Task Catalog°
Understanding the Construction Task Catalog°:Include All Appropriate
Tasks in Sample Projects
3216 23 00-0002 4'Cast 1n Place Concrete 54ow.RSF X5.06; 400 31024.00
.. For Quantili. 100 10 500.Add SF $2. 400 -- 5816.E _
32111600-0015 4'Q�shedAggregate8ase ,,SF. $0.q 400 5252.00 .,.
For Quantities UnderI000 SF - $0.18 400 $72.00 . •
0171 1300-0003:..- ._...,::Mabilae Backhoe :.•' - EA:'-. .5402.63 '1'- '540263
3123 16 36-0006 - Excalation.by Baddtae..:`...:. .. ,Of_. .r..•$3.75 11 - -..:$41.25 __, _ - - .. 72.
-,- For Quantities Under 20 C!,Add n".., - Cf $3.75 1 $41.25
31 23 16 36-0023 - . ..,Loading&c&14aterialsCY : -•:$3.42 1.75 :..$47.03'
_ For Quantities Under 20CY,.Add --CY $3.42 13 5 °$47.03 ::,. =....- - _
017419 00-0029 Hau1irq to Dump Site'.. - CYP4 $0.51 5105.57 • .
01 74 19 00-0021. - "_--Landfill Dump Fee • '_ - -CY $15.14 t3. --$203.18 $4,056.93
Compare these prices
Gc3R D IAN 1
The Contract Documents:
Construction Task Catalog®
Understanding the General Rules of the Construction Task Catalog'8: 00.0 01104.10M11•00•••111
•
• Unit Prices are for Complete and In-Place Construction �_ •••••.••••••..
=
The Contract Documents:
Construction Task Catalog®
Understanding the General Rules of the Construction Task
Catalog®: °•=T °-��--�°-,-
• Demo Price Includes Loading into Truck or Dumpster. • =e"
• If Item Demolished as Part of Different Task, It will Not be Paid for
Separately --- --- —'" ----
• Contractor Paid for Installed Quantities Only.Waste is Included in =7=7—
Unit Price
• Assembly Prices take Precedence over Component Pricing ,_®
• 14'Working Height for All Work Except Masonry .=
• 4'Working Height for Masonry -------
1.•----—=
• Dumpsters are a Separate Task
GOR D IAN'
The Contract Documents:
Construction .Task Catalog®
Understanding the General Rules of the Construction Task .
Catalog®: Contractors Never Get Paid Separately For the Following 1�.�:�
• Moving and Returning Furniture Occupying Less than 55%of Floor _a �
Area. For Example,Moving Classroom Furniture to Paint — "' " _
VnY4•
• Labor for Protecting Work in Place.For Example,a Laborer to Stay
The Contract Documents:
Non Pre-Priced Tasks
• Contractor must have permission from the City,to use a Non Pre-priced Task prior to submission
• Three(3)Quotes on vendors'or subcontractors'letterhead
• Justification for less than three(3)Quotes
• Contractor is paid the amount in the following formula:
3.4.13. The final price submitted for Non Pre-priced Tasks shall
be according to the following formula:
A= Hourly Labor Rate (for Trades not in the
Construction Task Catalogs)x the Quantity required
B= Direct Material Costs(supported by three quotes)
C= Direct Equipment•Costs(for Equipment not in the
Construction Task Catalog')x the Quantity required
0= Subcontractor Costs(supported by three quotes)
E= Allowable Overhead and Profit=(A+B+C)x 15%
F= Subcontractor Allowance=D x 10%
Total Cost of Non Pre-Priced Task=A+B+C+D+E+F
GORDIAN'
The Contract Documents
•
The._Technical.Specifications .
• Specifies,Quality of Materials and Job Order Contract
TechnicalSoecficatwns -
Workmanship ... ---
ct Kuno
• Corresponds with Tasks in the Construction
Task Catalog® - n
,4111, , 7
3r :i
. S'h.•145.Y}c: ` '�
6�RDIAN' '"
GORDIAN'
17 ADDENDUM NO.`8
INVITATION TO BID.(ITB)No.2019-257-KB
JOB ORDER CONTRACTING SERVICES—VARIOUS TRADES
Contract Specifics
PRIME CONTRACT OPPORTUNITIES INCLUDE:
• General Construction
• Horizontal Right-of-Way
• Electrical Construction
• Roofing
• Landscaping
GORDIAN'
Contract Specifics
Prior to Bidding, the.City.Cannot:
• Identify or Commit to any Specific Project or Location
• Identify or Commit to any Specific CTC Tasks or Quantities
Contract.Specifics Include:
• Base Term of Two (2)Years
• Three(3)Option Terms of One(1)Year each
• Estimated Annual Value for the City's JOC Program is$15,000,000
• City Anticipates Multiple Contracts for each Contract Type
• Local Workforce Participation Goal=30%
• Self-Performance Requirements Vary per Contract Type
GORDIAN'
18 ADDENDUM NO.3
INVITATION TO BID(ITB)No.2019-257-KB
JOB ORDER CONTRACTING SERVICES—VARIOUS TRADES
Contract Specifics
• Self-Performance Requirements .
• General Construction=10%
• Horizontal Right-of-Way=30%
• Electrical Construction=30%
• Roofing=51%
• Landscaping=51%
• Differing Site Conditions or Changes in Scope
• Priced from Construction Task Catalog'
• Supplemental.Job Order
• No Negotiated Change Orders
• Filings and Permits
• Fees paid for all Permits reimbursed 100%
• Liquidated Damages
• On.a Job Order-by-Job Order basis
• Sliding Scale Based on Job Order Value
GORDIAND
Contract Specifics
• Award Based on Competitive Bid
• Must Bid Two(2)Adjustment Factors:
• Normal Working Hours:Monday through Friday,7:00 am to 4:00 pm except holidays
• Other than Normal Working Hours:Monday through Friday,4:01 pm to 6:59 am,and all day
Saturday,Sunday,and holidays.
• Adjustment Factors Apply to All Tasks in the CTC
• Each Adjustment Factor is Weighted to Create a Total Base Bid
• Normal Working Hours=80%
• Other than Normal Working Hours=20%
• The Other than Normal Working Hours Adjustment Factor must be Equal to or
Greater than the Normal Working Hours Adjustment Factor
• Lowest Total Base Bid from a Responsive, Responsible Bidder is Determined to be
the Lowest Price
GORDIAN'
19 I ADDENDUM NO.3
INVITATION TO BID(ITB)No.2019-257-KB
6 JOB ORDER CONTRACTING SERVICES—VARIOUS TRADES
Contract Specifics
Internet Based Software
Provided with Contract
• Gordian Cloud Software
Expedites the Job
Order
Process
._ -.—,-1, _
" - -
_ _
,2
= -
•
....so_
a ^ _ Price Proposals
• Subcontractor Lists
• Tracking Dates
• Required Job Order Forms
- - • Training provided
GORDIAN9
Contract Specifics
JOC SYSTEM.LICENSE FEE
• Access to Gordian Cloud,Construction Task Catalog*,other proprietary materials
• Most advanced technology and data in the marketplace.
• Paperless
• Efficient
- Tasks and prices input directly...no fishing through old files and estimating books for costs
• JOC process training
• Gordian Cloud software training.
• Unlimited software support.
• Included in the Contractor's Adjustment Factors
• Consider with the Bid as an.Overhead cost
• License Fee Equal to 1%of the Job Order Price
GORDIAN'
20 ADDENDUM NO.3'
INVITATION TO BID(ITB)No.2019-257-KB
JOB ORDER CONTRACTING SERVICES—VARIOUS TRADES
Calculating the Adjustment Factors:
Method to Calculate
• Use Historical-Project Data
• Select a Completed Project
• You Know Scope and Direct.Costs
• Price Project From CTC
• Add on Overhead and Profit
• Calculate the.Adjustment Factor
G*RDIAN5
Calculating the Adjustment Factors:
Sample Project: Detailed Scope of Work
• Interior Renovation
• Doors and Hardware
- Replace 12 interior doors,hinges and hardware
- Doors shall be 3x7,solid core wood doors
• Grade 2 locksets with knobs
• Replace 2 push bar exist devices and door closers on exit doors
• Interior lighting
• Replace all lay-in troffer fixtures on first and second floors.48 in total
• Replace 4 exit fixtures
• Replace 12 industrial fixtures in shop area
• Plumbing Fixtures
• Replace 8 bathroom sinks,8 faucets,and 8 toilets in men's and women's bathroom in admin
building and shop area
• Replace 4 water fountains
• Replace Boiler
• Demo existing boiler and as much piping and venting to accommodate new boiler.Install a new
1028 mbh oil Fred cast iron boiler.No access for packaged boiler.Must field assemble sections.
Provide new piping as required.
• Normal Working Hours Apply
G4RDIAN' '
•
21 ADDENDUM NO.3
INVITATION TO BID(ITB)No.2019-257-KB
JOB ORDER CONTRACTING SERVICES—VARIOUS TRADES
•
Calculating the Adjustment Factors:
Sample Project: Price Proposal-
Comractol's Price Proposal Summary.Category
rrat&dant tcaot FaNa=14
7tc • naca aatrpa4ttuzo ---tom- - ---^
.c b t rhe`rlan Cema - - • -
PtoP•aarYalm.• Hd2a1.12 - ---_ — ,-
Proposal:4a.. HOMO Satryh+eowatta -. -. -
•Oen sno.i - _' -
Ctocta zed Na d.= sums -• - ..a 'a+
tkhttw: 413.119.71 - =• '- -
P hetlotf • S11,119633
MA Order ForyfdTots/ 30331.12 ..�.
r----
_
GORDIAN'
Calculating the Adjustment Factors:
Sample Price: CTC vs. Quote
Direct Cost of Work from Direct Cost of Work from
. CTC Quotes or Estimates
• Replace Boiler $33,055.73 • Replace Boiler -$34,500.00
• Doors/Hardware $ 8,282.09 • Doors/Hardware $ 7,250.00
• Lighting $13,119.77 • Lighting $12,750.00
• Plumbing $11;886.53 • Plumbing $10,500.00
TOTAL = $66,344.12 TOTAL = $65,000.00
GORDIAN'm
22 ; ADDENDUM NO.3
INVITATION TO BID(ITB)No.2019-257-KB •
JOB ORDER CONTRACTING SERVICES—VARIOUS TRADES
Calculating the Adjustment Factors:
Sample Price: Putting it all together
• A. Direct Cost of Work from Quotes $65,000.00
• B. Overhead 10%* $ 6,500.00
• C. Subtotal(Cost&0/H) $71,500.00
• D. Profit 10%* $ 7,150.00
• E. Subtotal(Cost&0/H &Profit) $78,650.00
- F. Price From CTC $66,344.12
- Adjustment Factor(=E/F) = 1.1855
*Sample Only.Contractor to determine 0/H&Profit.
Prepare this calculation for more than one sample project.
GORDIAN*
Completing the Bid Tender Form B1:
_ ., r .s.:_._....o-a...::, :. :. _......_a.. -....._,.. ..,... _._....._..+...v..-.tea _ i...� __. -..... �.. .......... _....v.. -_.-_.1...,
.AilirrstmerrtFactorName _; ; Bid AdlusfaientFictor.. XRititiker=DrvisicrnTctd
° Adjustment Factor for Normal Working 1 18.55 = 0.9484x0.80Hours
-
7,,
i Adjustment Factor for Other Than 1 2 2 0 5 x0.20 = 0 2 4' 4 1 r
- - .ii,, Normal Working Hours —' ———— — ————
3 Add all the Total amounts in the right column.
The Sum of these Total amounts is the Total ease Bid = 1_ 1 9 2 5'
*SAMPLE ONLY --__.------77-----",-'-,,..._....r--.___ _v_ -7 ------ - -. -
GORDIAN
5ADDENDUM NO.3 -
INVITATION TO BID(ITB)No.2019-257-KB
JOB ORDER CONTRACTING SERVICES-VARIOUS TRADES
Considerations
• Annual Price Adjustment
• Applied annually on the Anniversary of the Contract Award Date
• Based on CO(average of 20 US cities) published by Engineering News Record
• Calculation (Based on ITB month)
Average CCI for Current Year = The%Increase or Decrease in
Average CCI for Base Year Construction Costs
• Percentage x Original Adjustment Factors=New Adjustment Factors for Next Year
• Normal Working Hours
• Other Than Normal Working Hours
•
GORDIAN.
Considerations
•
• Contractors Should Expect To •.
• Prepare Incidental Drawings or Sketches for Some Projects
• Justify Quantity Calculations
• Explain Detail of Work
• Prepare Proposals for Some Projects That Might be Canceled
• Margins on CTC Tasks Vary
• Some Projects are More Profitable than Others
• Maintain a Fully Functioninglocal Office
• Hold Required Licenses .
• Rebate 1% of each Job Order as a Contractor License.Fee
GORDIAN'
24 ADDENDUM NO.3
INVITATION TO BID(ITB)No.2019-257-KB
JOB ORDER CONTRACTING SERVICES—VARIOUS TRADES
Considerations
Importance of Contractor's Adjustment Factors
• Determines Lowest Proposed Price, an Evaluation Component for Contract Award
• Used to Price Individual Job Orders
• Price Proposal Total Becomes the Lump Sum Job Order Price
Unit Price x Quantity x Adjustment Factor = Total for Task
+
Unit Price x Quantity x Adjustment Factor = Total for Task
+ •
Unit Price x Quantity x Adjustment Factor = Total for Task
Total Job Order Price
GORDIAN•
Considerations
Risks of Loin Adjustment Factors
• Leads to Arguments in Proposal Review
• Unsupportable Tasks
• Exaggerated Quantities
• Leads to Delays in Job Order Development
• Takes Longer to Review Proposals
• Creates an Adversarial Relationship
• Reduced Volume of Work
• Will Shorten Contract
• Lost Profitability
• No Second Chance to Improve your Margin
GOR D IAN°
25 I ADDENDUM NO.3 '
INVITATION TO BID(ITB)No.2019-257-KB
JOB ORDER CONTRACTING SERVICES—VARIOUS TRADES
•
•
Review of Key Points
• Focus on Total Potential Value of Contract
• Potential Five(5)Year Contract
• Evaluate Construction Task Catalogs
• Analyze Unit Prices
• Know the General Guidelines for Using the CTC
• Contractor Performance Drives Volume
• Ability to Market Program and Services
•
• Responsive Service
• Accurate Proposals
• Safe and Clean Project Sites
• High Quality Construction
• • On-Time Completion &Close Out
• Meet or Exceed the Local Workforce Participation Goals
G 'RDIAN'
•
Bid Submission
•
•
. SubmittalRequirements .
&broths Lcatan: Baia cid be received at
ark Mart Reach
Po:c oem a Oepalmml,
1755 Meriden Avutus,3u Pdciltmld Soadr,Sada 33132
SubmttaiFmmat& Elth BM to be subistlediema'adp jedearly,xntanalltfonndioganicmnaedis&madaKewth,
rvegtmemmis: &Oka 03CO,irbd'iig
TAB c.C9M CR._QT81. GAEONNR_1�fAP�ENDKA.)
Stoat to Cadroderastffirnfirn Form(Amick A)mrgloWl and Sty emoded.
IAB 8:MINIMUM 01 lal IF1,ATII)NS ANI)SIIFNB RAI RFOMIRRaFN7�
Sand e%idiom,as specificaly raqueatad in the ITS Swrrnay,of ccegIbnce vett each nisi on
mglxcmcnt(s)atthb ITB.Satan that donotmoldy,afor vAxmttaCitycaautverify ccsnpfnco,
shall bedamned uu uspaeivroadPubidshadmlbawaalered.
TAO C Bt)•TENCER roll( 6ID DOND
the tolaem3 documents shall ba submitted with the by the deadline Ica subtratlal old:
1. Bid Tender Pam The ad Termor Fam(Appada B,Farm BQ.
FAILURE TO SUBMIT THE MOST RECENT CO?RPLETED AND EXECUTED:1)BID TENDER
FORM(EITHER INCLUDED IN THE ORIGINAL ITB OR RELEASED VIA AN ADDENDUM)
SHALL RESULT Pt BID BEING DEEM NOT RESPONSIVE AND NOT BEING FURTHER
CCNSIDERED.
TAH c:BID FORMS
Subml any oma beth requested on tern)Sunray,redwing bre not Smiled to:
1. Adma:Aedgmrd of Addenda,Adz R.Fane B3:
2 Load WaldatoRespanshfeContact=Affidmit,Part A
•
GORDIAN'
26 ADDENDUM NO.3 '
INVITATION TO BID.(ITB)No.2019-257-KB •
JOB ORDER CONTRACTING SERVICES—VARIOUS TRADES
Bid Submission
SECTION 0300—BID SUBMITTAL FORMAT
1. Number Of Copies. One original Bid Proposal (preferably in 3-ring binder) must be
submitted in an opaque,sealed envelope or container on or before the due date established for
the receipt of bids.Additionally, two (2) bound copy and one(1)electronic format(CD or USB
format)are to be submitted.The following information should be clearly marked on the face of the
envelope or container in which the bid is submitted: Bid Number, Bid Title, Bidders Name, and
Bidder Return Address. Bids received electronically, either through email or facsimile, are not
acceptable and will be rejected.
GORDIAN'
Bid Submission
• Make Sure you Signed the Attendance Sheet
•
• All questions concerning this solicitation must be received no later
than:
• Tuesday,June 4, 2019, 5:00 PM, Local Time
• Submit questions to:
• Name: Kristy Bada, Contracting Officer III
• Telephone: 305-673-7000:Ext. 6218
• Email: Krista.Badac mtamibeachft.gov
• Bids Due:
• Friday,June 14, 2019, 3:00 PM, Local Time
GORDIAN'
27 ADDENDUM NO.3
INVITATION TO BID(ITB)No.2019-257-KB
JOB ORDER CONTRACTING SERVICES—VARIOUS TRADES
WUMkIBEAQH.
City of Miami Beach, 1/55 Meridian Avenue,;i'°Floor, Miami Beach,Florida 33139,www.miamibeachfl.gov
PROCUREMENT DEPARTMENT
Tel: 305-673-7490 Fax: 786-394-4002
ADDENDUM NO. 2,
ITB 2019-257-KB
JOB ORDER CONTRACTING SERVICES —VARIOUS TRADES
May 21, 2019
This Addendum to the above-referenced ITB is issued in response to questions from prospective
proposers, or other clarifications and revisions issued by the City. The ITB is amended in the
following particulars only (deletions are shown by strikethrough and additions are underlined).
I. CLARIFICATION. The Invitation to Bid Summary, Procurement Contact has been
revised as follows:
Procurement Contact: Telephone: Email:
Kristy Bada, 305-673-7000, Krista.Bada@miamibeachfl.gov
Contracting Officer III, ext. 26218 KristvBadaAmiamibeachfl.gov
CPPB
:A forthcoming`adtdehdum_Will contain.responses to questions received. .
Any questions regarding this Addendum should be submitted in writing to the Procurement
Department to the attention of the individual named below, with a copy to the City Clerk's Office
at RafaelGranado c@miamibeachfl.gov.
Proposers are reminded to acknowledge receipt of this addendum as part of your ITB
submission.
erely, •
lex D nis •
Procu ment Director
I ADDENDUM NO.2
INVITATION TO BID(ITB)No.2019-257-KB
JOB ORDER CONTRACTING SERVICES—VARIOUS TRADES
MIAMI BEACH
City of Miami Beach, 1755 Meridian Avenue, 3'" Floor, Miami Beach, Florida 33139, www.miamibeachfl.gov
PROCUREMENT DEPARTMENT
Tel: 305-673-7490 Fax: 786-394-4002
ADDENDUM NO. 1
ITB 2019-257-KB -
JOB ORDER CONTRACTING SERVICES —VARIOUS TRADES
May 15, 2019
This Addendum to the above-referenced ITB is issued in response to questions from prospective
- proposers, or other clarificationsand revisions issued by the City. The ITB is amended in the
following particulars only (deletions are shown by strikethrough and additions are underlined).
I. ATTACHMENT(S).
Exhibit A: Construction Task Catalog
Exhibit B: Technical Specifications
" A.forthcomin• addendumwill contain res onses to questions received.
Any questions regarding this Addendum should be submitted in writing to the Procurement
Departmentto the attention of the individual named below, with a copy to the City Clerk's Office at
RafaelGranadomiamibeachfl.cov.
Procurement Contact: Telephone: Email:
Kristy Bada 305-673-7000, ext. 6218 KristyBada@miamibeachfl.gov
Proposers are reminded to acknowledge receipt of this addendum as part of your ITB submission.
Sincerely,
•
Alex Denis
Procurement Director
•
1 ADDENDUM NO.1
INVITATION TO BID(ITB)No.2019-257-KB
JOB ORDER CONTRACTING SERVICES—VARIOUS TRADES
MIAMI BEACH
INVITATION TO BID (ITB)
Project Title: JOB ORDER CONTRACTING SERVICES —VARIOUS TRADES
ITB No. 2019-257-KB
BID ISSUANCE DATE: TUESDAY, MAY 14, 2019
BID OPENING: FRIDAY, JUNE 14, 2019. AT 3:00PM
ISSUED BY: KRISTY BADA, CONTRACTING OFFICER III
1 12019-257-KB
MIAMI BEACH
ITB SUMMARY
The purpose of this ITB Summary is to summarize the major terms, conditions and requirements of the ITB. . Bidders
shall note that various paragraphs within these bid documents have a box( 0 )which may be checked( ❑O ). If the box
is checked, the language is made a part of the bid documents and compliance therewith is required of the Bidder; if the
box is not checked, the language is not made a part of the bid documents.lt is the Bidder's responsibility to become
familiar with all terms, conditions and requirements of the ITB, whether or not included in the ITB Summary. Further, it is
the Bidder's responsibility to make note of'and account for any revisions to any portion of the ITB Summary that may
result from an addendum to the ITB.
ITB Information&General Requirements -
ITB No.: 2019-257-KB
ITB Title: JOB ORDER CONTRACTING SERVICES—VARIOUS TRADES
Date of Issuance: Tuesday, May 14,2019
Project Description & Furnish all, labor, materials, equipment and supplies in order to provide Job Order
Scope of Work: Contracting services to the City of Miami Beach, FL.
Prime Contract Opportunities Include:
-General Construction
-Horizontal Right-of-Way
-Electrical Construction
• -Roofing
-Landscaping
The work of each awarded Contract will be set'forth in the Detailed Scopes of Work
referenced in the individual Job Orders. The Contractor is required to complete each
Detailed Scope of Work for the Job Order Price within the Job Order Completion Time.
The proposed Adjustment Factors are to include the furnishing of all labor, materials,
equipment including tools, shoring, services, permit fees, applicable taxes, overhead and
profit for the completion of the Detailed Scope of Work except as may beotherwise
expressly provided in the Contract Documents.
If submitting a Bid for more than one trade, Bidders shall submit a separate bid package for
each trade being bid.
Project Location: Various City-wide.
Estimated Budget: N/A
Procurement Contact: Name: Kristy Bade, Contracting Officer III
Telephone:305-673-7000 Ext.6218
Email: Krista.Bada@miamibeachfl.gov
Cone of Silence: Bidders are hereby advised that, pursuant to Section 2-486 of the City. Code, this
solicitation is under the Cone of Silence law. Communications regarding this solicitation are
to be submitted in writing to the Procurement Contact named herein with a copy to the City
Clerk at rafaeloranado(a,miamibeachfl.gov.
Important Dates
2 I 2019-257-KB
MIAMI BEACH
Due Date&Time for Bid The deadline for submittal of bids is 3:00 p.m.,on Friday,June 14,2019.
Submittal:
Bidders are cautioned that late bids will not be accepted. Bidders are fully responsible for
Due date may be modified by assuring that bids are received by the deadline and shall consider all factors, including but
addendum to the ITB. It is
important that bidder download all not limited to,weather, traffic and third-party carrier delays.
addenda.
Pre-Bid Conference: Date: Tuesday, May 28,2019
Time: 10:00 AM Local Time
® Pre-Bid Conference will Location: 1st Floor Community Conference Room
•be held. 1700 Convention Center Drive
Miami Beach, FL 33139
❑ Pre-Bid Conference is
Mandatory. Dial-in Instructions:
• Dial the Telephone Number: 1-888-270-9936
❑ A Pre-Bid Conference • Enter the Meeting Number:9415468 and then press the pound (#) key
will not be held.
Site Visit:• Date: N/A
Time: N/A
D Site Visit will be held. Location: N/A
•
❑ Site Visit is Mandatory.
® Site Visit will not be
held.
Last Day for Receipt of Questions will be allowed through Tuesday, June 4, 2019 by 5:00 PM Local Time.
Questions:
Project Specific Information&Requirements
Minimum Requirements: Bids from bidders that do not meet the following Minimum Requirements shall be deemed
non-responsive and shall not be considered.
® Shall apply.
1. Licensing Requirements. Bidder shall have all applicable licenses for the trade
❑ Shall not apply. being bid.
Submittal Requirement:Submit a copy of the appropriate licenses with the Bid.
Bid Bond Requirements: If the requirement applies, Bidder shall submit,WITH ITS BID, an original bid bond, certified
check, or cashier's check, in the amount of 5% of the bid amount, payable to City of Miami
❑ Shall apply. Beach, Florida.
® Shall not apply. Failure to include the bid bond WITH THE BID shall result in the bid being deemed
non-responsive and not being considered.
Davis-Bacon Wage Rates: If required for a federally funded Job Order, Bidder agrees it, and its sub-contractors, shall
pay laborers and mechanics employed under the contract no less than the prevailing wage
® Shall apply. rate and fringe benefit payments to be used in implementation of this article shall be those
last published by the United States Department of Labor in the Federal Register prior to the
3 I 2019-257-KB
MIAMIBEACH
❑ Shall not apply. date of issuance of the ITB.
Insurance: If the requirement applies, Bidder agrees it shall fully comply with the requirements of
Appendix A-2,Article 9 in maintaining the following insurance requirements:
Shall apply.
1.Workers' Compensation and Employer's Liability per the Statutory limits of the state of
❑ Shall not apply. Florida.
2.Comprehensive General Liability (occurrence form) with limits of liability $ 1,000,000.00
per occurrence for bodily injury property damage to include Premises/ Operations;
Products, Completed Operations and Contractual Liability.
3.Automobile Liability with limits of$1,000,000 each occurrence - owned/non-owned/hired
automobiles included.
4.Builders Risk for the full value of structure, materials,fixtures and equipment.
•
Contract Price: As indicated, contract pricing shall be based on lump sum or unit pricing in accordance with
Section 0400, Terms and Conditions of the Contract.
® Lump sum pricing shall
apply. The Job Order Price shall be a lump sum, fixed price for the completion of the Detailed
Scope of Work.
❑ Unit pricing shall apply.
Contract Completion Time& Days for Substantial Completion:To be identified with each Job Order
Schedule: Days for Final Completion:To be identified with each Job Order
Project Scheduling Software to Be Identified with Each Job Order. Types may include any
of the following:
❑ Bar Chart
❑ Computerized CPM using Primavera"P6"software
❑ Modified CPM
❑ Microsoft Project
Liquidated Damages: 1. Liquidated damages will be applied on a Job Order-by-Job Order basis in accordance
with the schedule for liquidated damages set for in the General Conditions,Article 6.7.
® Shall apply.
❑ Shall not apply.
Local Workforce If the requirement applies, the Bidder agrees it, and its sub-contractors, shall make its best
Participation: reasonable efforts to promote employment opportunities for Miami-Dade County residents
by seeking to achieve a project goal of having thirty percent(30%) of all construction labor
® Shall apply. hours performed by Miami-Dade County residents. The contractor shall also make its best
reasonable efforts.to promote employment opportunities for Miami Beach residents.
❑ Shall not apply.
Minimum%of Self-Work Minimum%of the Work Contractor self-perform with its own forces:
Requirement: -General Construction= 10%
® Shall apply. -Horizontal Right-of-Way=30%
-Electrical Construction =30%
❑ Shall not apply. -Roofing=51%
4 I 2019-257-KB
MIAMI BEACH
-Landscaping=51%
Performance&Payment If required for a Job Order, the Contractor shall deliver a Payment and Performance Bond
Bond Requirements: in the amount of such Job Order. The bonds must be in a form, and executed by a surety,
acceptable to the City. The bond must be received before the Notice to Proceed will be
Shall apply. issued. The Contractor shall be compensated for the cost of the bonds up to 2% of the Job
Order Price through the reimbursable work task in the Construction Task Catalog®.
❑ Shall not apply.
Prevailing Wage Rates: If the requirement applies, Bidder agrees it, and its sub-contractors, shall pay laborers and
mechanics employed under the contract no less than the prevailing wage rate and fringe
® Shall apply. benefit payments to be used in implementation of this article shall be those last published
by the United States Department of Labor in the.Federal Register prior to the date of
❑ Shall not apply. issuance of the ITB.
Required Licenses/Permits: Contractors performing the work shall be licensed to perform the work. As required for a
Job Order, the Contractor may be required to obtain a permit. The cost of the permit will be
® Shall apply. treated as a reimbursable task in the Job Order Price Proposal.
❑ Shall not apply.
Trench Safety Act If required for a Job Order,the Bidder must comply with the Trench Safety Act requirements
Requirements during the execution of the work.
® Shall apply.
❑ Shall not apply.
Consultant: N/A
Departmental Contract N/A—Various Departments will be using the Job Order Contracts.
Manager:
Submittal Requirements
Submittal Location: Bids will be received at:
City of Miami Beach
Procurement Department,
1755 Meridian Avenue, 3rd Floor Miami Beach, Florida 33139.
Submittal Format& Bids are to be submitted in sealed package clearly, contain all information, and organized in
Requirements: accordance with Section 0300, including:
TAB A: CONTRACTOR QUALIFICATION FORM (APPENDIX A)
Submit the Contractor Qualification Form (Appendix A) completed and fully
executed.
TAB B: MINIMUM QUALIFICATIONS AND SUBMITTAL REQUIREMENTS
Submit evidence, as specifically requested in the ITB Summary,of compliance with
each minimum requirement(s)of this ITB. Bidders that do not comply,or for whom
the City cannot verify compliance, shall be deemed non-responsive and its bid
5 I 2019-257-KB
MIAMI BEACH
shall not be considered.
TAB C: BID TENDER FORM&BID BOND
The following documents shall be submitted with the by the deadline for submittal
of bids:
1. Bid Tender Form.The Bid Tender Form(Appendix B, Form B1).
FAILURE TO SUBMIT THE MOST RECENT COMPLETED AND EXECUTED: 1)
BID TENDER FORM (EITHER INCLUDED IN THE ORIGINAL ITB OR
RELEASED VIA AN ADDENDUM) SHALL RESULT IN BID BEING DEEMED
NOT RESPONSIVE AND NOT BEING FURTHER CONSIDERED.
TAB C: BID FORMS
Submit any other form requested on the ITB Summary,including but not limited
to:
1. Acknowledgment of Addenda„Appendix B, Form.B3.
2. Local Workforce Responsible Contractor Affidavit, Part A
6 I 2019-257-KB
MIAMIBEACH
TABLE OF CONTENTS
SOLICITATION SECTIONS PAGE
0100 INSTRUCTIONS TO BIDDERS 8
0200 MINIMUM QUALIFICATIONS 11
0300 BID SUBMITTAL FORMAT 11
0400 TERMS & CONDITIONS (Under separate cover.) 12
APPENDICES: PAGE
APPENDIX A CONTRACTOR PRE-QUALIFICATION FORM 13
APPENDIX B BID TENDER FORM 22
APPENDIX C GENERAL CONDITIONS FOR JOB ORDER CONTRACTS 26
APPENDIX D CONTRACT 80
APPENDIX E JOC INSTRUCTIONS TO BIDDERS 84
APPENDIX F JOC SUPPLEMENTAL CONDITIONS 87
7 2019-257-KB
MIAMI BEACH
SECTION 0100— INSTRUCTIONS TO BIDDERS:
1. General. This Invitation to Bid (ITB) is issued by the City of Miami Beach, Florida (the
"City"), as the means for prospective Proposers to submit their qualifications, proposed scopes
of work and cost proposals (the "proposal") to the City for the City's consideration as an option
in achieving the required scope of services and requirements as noted herein. All documents
released in connection with this solicitation, including all appendixes and addenda, whether
included herein or released under separate cover, comprise the solicitation, and are
complementary to one another and together establish the complete terms, conditions and
obligations of the Proposers and, subsequently, the successful Proposer(s) (the "contractor[s]")
if this RFP results in an award.
The City utilizes PublicPurchase (www.publicpurchase.com) for automatic notification of
competitive solicitation opportunities and document fulfillment, including the issuance of
any addendum to this RFP. Any prospective Proposer who has received this RFP by any
means other than through PublicPurchase must register immediately with
PublicPurchase to assure it receives any addendum issued to this RFP. Failure to receive
an addendum may result in disqualification of proposal submitted.
2. Background and Scope of Work: The Project is described more fully in the Invitation
to Bid Summary (and/or the exhibits referenced therein).
3. Abbreviations and Symbols. The abbreviations used throughout the Contract
Documents are defined hereinafter in the Technical Specifications. The symbols used in the
Plans are defined therein.
4. Examination of Contract Documents and Site. It is the responsibility of each Bidder
before submitting a Bid, to:
a. Examine the Contract Documents thoroughly.
b. Take into account federal, state and local (City and Miami-Dade County) laws,
regulations, permits, and ordinances that may affect costs, progress,
performance, furnishing of the Work, or award.
c. Study and carefully correlate Bidder's observations with the Contract Documents.
d. Carefully review the Contract Documents and notify City of all conflicts, errors or
discrepancies in the Contract Documents of which Bidder knows or reasonably
should have known.
The submission of a Bid shall constitute an incontrovertible representation by Bidder that
Bidder has complied with the above requirements and that without exception, the Bid is
premised upon performing and furnishing the Work required by the Contract Documents and
that the Contract Documents are sufficient in scope and detail to indicate and convey
understanding of all terms and conditions for performance and furnishing of the Work.
5. Location of Work. The Detailed Scope of Work shall be completed at the Project
Site/Location of the Work specified in the Job Order (the "Project Site").
6. Pre-Bid Interpretations. Only those questions answered by the City's Procurement
Department, via written addendum to this ITB, shall be binding as to this ITB. City's answers to
8 I 2019-257-KB
MIAMI BEACH
questions may supersede terms noted in this ITB, and in such event, such answers shall govern
and control this ITB. Verbal and other interpretations or clarifications of City representatives or
employees will be without legal effect. All questions about the meaning or intent of the Contract
Documents are to be directed to the City's Procurement Director in writing. Interpretations or
clarifications considered necessary by the City's Procurement Director in response to such
questions will be issued by City by means of addenda mailed or delivered to all parties recorded
by the City's Procurement Director as having received the Bidding Documents. Written
questions should be received no later than Tuesday, June 4, 2019 by 5:00 PM local time.
There shall be no obligation on the part of City or the City's Procurement Director to
respond to questions received after this time.
7. Printed Form of Bid. All bids must be made upon the blank Bid/Tender Form included
herein and must give the price in strict accordance with the instructions thereon. The bid must •
be signed and acknowledged by the Bidder in accordance with Section 0300 and must be
received on or before the deadline for the submittal of bids. Late bids will not be accepted and
will not be considered. It is the Bidder's responsibility to account for weather, traffic, courier or
any other possible delay.
8. Bid Bond. If the Invitation to Bid Summary specifies that a bid bond is required, Bidder
shall submit, WITH ITS BID, either an original bid bond, in a form acceptable to the City,
executed by a surety company meeting the qualifications specified herein, in the amount of 5%
of the bid amount, payable to City of Miami Beach, Florida. In the alternative, Bidder may submit
a certified check or cashier's check issued by any national or state bank (United States).
A PERSONAL CHECK OR A COMPANY CHECK OF A BIDDER SHALL NOT BE DEEMED A
VALID BID SECURITY.
Security of the successful Bidder shall be forfeited to the City of Miami Beach as liquidated
damages, not as a penalty, for the cost and expense incurred should said Bidder fail to execute
the Contract, provide the required Performance Bond, Payment Bond and Certificate(s) of
Insurance, within fifteen (15) calendar days after notification of the award of the Contract, or
failure to comply with any other requirements set forth herein. Bid guaranties of the
unsuccessful Bidders will be returned after award to the successful bidder.
9. Prevailing Wage Rates & Local Workforce Participation. See ITB Bid Summary to
determine if prevailing wages and local workforce participation are a requirement of this ITB. If
required, Chapter 31, Articles II and III, of the Code of City of Miami Beach requires that the rate
of wages and fringe benefits, or cash equivalent, for all laborers, mechanics and apprentices
employed by any contractor or subcontractor on the work covered by the contract, shall not be
less than the prevailing rate of wages and fringe benefit payments or cash equivalence for
similar skills or classifications of work, as established by the Federal Register last published by
the United States Department of Labor prior to the date of issuance of this solicitation.
Additionally, the contractor will make its best reasonable efforts to promote employment
opportunities for Miami-Dade County residents by seeking to achieve a project goal of having
thirty percent (30%) of all construction labor hours performed by Miami-Dade County residents.
The contractor shall also make its best reasonable efforts to promote employment opportunities
for Miami Beach residents.
10. Method of Award. Following the review of bids and application of vendor preferences,
the lowest responsive, responsible bidder(s) meeting all terms, conditions, and specifications of
the ITB will be recommended for award by bid item, bid group, or for the entirety of all bid items,
9 12019-257-KB
MIAMIBEACH
as deemed in the best interest of the City, to the City Manager for his consideration. After
considering the staff recommendation for award, the City Manager shallexercise his due
diligence and recommend to the Mayor and City Commission the bid that the City Manager
deems to be in the best interest of the City. The City Commission shall consider the City
Manager's recommendation(s) and, may approve or reject the City Manager's
recommendation(s). The City Commission may also reject all bids received. In determining the
lowest and best bidder, and in addition to price, Section 2-369 of the City Code provides that the
City may consider the following:
• The ability, capacity and skill of the bidder to perform the Contract.
• Whether the bidder can perform the Contract within the time specified, without delay or
interference.
• The character, integrity, reputation, judgment, experience and efficiency of the bidder.
• The quality of performance of previous contracts.
The previous and existing compliance by the bidder with laws and ordinances relating to the
Contract.
The selection or approval by the City Commission shall not constitute a binding
contract between the City and the selected or approved bidder(s). A binding contract will exist
upon the completion as determined by the Administration, the City Attorney's Office form
approving the contract or contracts, and the Mayor and City Clerk or their respective designees
signing the contract(s) after the selected or approved bidder(s) has (or have) done so. Only
the executed contract(s) will be binding on the contracting parties.
11. Price (Adjustment Factors): The Adjustment Factors are to include the furnishing of all
labor, materials, equipment including tools, shoring, services, permit fees, applicable taxes,
overhead. and profit for the.completion of the Detailed 'Scope of Work except as may be
otherwise expressly provided in the Contract Documents.
12. Florida Trench Safety Act. If the work involves trench excavations that will exceed a
depth of 5 feet, the requirements of Florida Statutes, Chapter 553, Part III, Trench.Safety Act,
will be in effect. The Bidder, by virtue of submitting a bid, certifies that such Act will be complied
with during the execution of the work. Bidder acknowledges that included in the Job Order Price
are all costs for complying with the Florida Trench Safety Act.
13. Financial Capacity. Within three (3) business days of request by the City, each
Proposer shall arrange for Dun & Bradstreet to submit a Supplier Qualification Report (SQR).
directly to the Procurement Contact named herein. No proposal will be considered without
receipt, by the City, of the SQR directly from Dun & Bradstreet. The cost of the preparation of
the SQR shall be the responsibility of the Proposer. The Proposer shall request the SQR report
from D&B at:
https:llsupplierportal.dnb.com/webapp/wcs/stores/servlet/SupplierPortal?storeld=11696
Proposers are responsible for the accuracy of the information contained in its SQR. It is highly
recommended that each Proposer review the information contained in its SQR for accuracy
prior to submittal to the City'and as early as possible in the solicitation process. For assistance
with any portion of the SQR submittal process, contact Dun & Bradstreet at 800-424-2495.
14. Omitted or Additional Information. With exception of the Bid Tender Form and the Bid
Bond, if applicable, the City reserves the right to seek any omitted information/documentation or
any additional information from bidder or other source(s), including but not limited to: any firm or
principal information, applicable licensure, resumes of relevant individuals, client information,
10 I 2019-257-KB
MIAMI BEACH
financial information, or any information the City deems necessary to evaluate the capacity of
the Proposer to perform in accordance with contract requirements. Failure to submit any omitted
or additional information in accordance with the City's request shall result in proposal being
deemed non-responsive.
SECTION 0200—MINIMUM QUALIFICATIONS AND REQUIREMENTS
The Minimum Eligibility Requirements for this solicitation are listed in the ITB Bid Summary.
Bidders that fail to comply with minimum requirements shall be deemed non-responsive and
shall not have its bid considered.
SECTION 0300— BID SUBMITTAL FORMAT
1. Number Of Copies. One original Bid Proposal (preferably in 3-ring binder) must be
submitted in an opaque, sealed envelope or container on or before the due date established for
the receipt of bids. Additionally, two (2) bound copy and one (1) electronic format (CD or USB
format) are to be submitted. The following information should be clearly marked on the face of
the envelope or container in which the bid is submitted: Bid Number, Bid Title, Bidders Name,
and Bidder Return Address. Bids received electronically, either through email or facsimile, are
not acceptable and will be rejected.
The City reserves the right to request any documentation omitted, with exception of the
signed Bid Price Form and Bid Bond (if applicable), which must be submitted at time of
bid. Bid Submittals received with no Bid Price Form or Bid Bond (if applicable), or with an
unsigned Bid Price Form, shall be deemed non-responsive. Bidder must submit any other
omitted documentation within two (2) business days upon request from the City, or the bid may
be deemed non-responsive. Non-responsive bid packages will receive no further consideration.
2. Bid Submission Format: Bid packages must contain the following information and
documents, each fully completed, signed, in the order dictated below. Bid packages which do
not include all required documentation, or are not submitted in the required format, or do not
have the appropriate signatures or notarizations on each document, may be deemed non-
responsive.
TAB A: Contractor Qualification Form (Appendix A)
Submit the Contractor Qualification Form (Appendix A) completed and fully
executed.
TAB B: Minimum Qualifications And Submittal Requirements
Submit evidence, as specifically requested in the ITB Summary, of compliance
with each minimum requirement(s) of this ITB. Bidders that do not comply, or for
whom the City cannot verify compliance, shall be deemed non-responsive and its
bid shall not be considered.
TAB C: Bid Tender Form & Bid Bond
The following documents shall be submitted with the by the deadline for submittal
of bids:
• Bid Tender Form.
• Bid Bond.
BIDDERS ARE CAUTIONED THAT FAILURE TO SUBMIT THE MOST
RECENT COMPLETED AND EXECUTED: 1) BID TENDER FORM (EITHER
INCLUDED IN THE ORIGINAL ITB OR RELEASED VIA AN ADDENDUM) AND
11 I 2019-257-KB
• MIAMI BEACH
2) BID BOND (IF REQUIRED) SHALL RESULT IN BID BEING DEEMED NOT
RESPONSIVE AND NOT BEING FURTHER CONSIDERED.
TAB C: Bid Forms
Submit any other form requested on the ITB Summary, including but not limited
to:
• Acknowledgment of Addenda, Appendix B, Form B2.
• Local Workforce Responsible Contractor Affidavit, Part A
3. BID SUBMITTAL DEADLINE: Bids, and all required information, must be received on or
before the deadline established in the ITB Summary Sheet. Late bids will notbe accepted and
will not be considered. Bidders are solely responsible for assuring that bids are received prior to
the submittal deadline and are cautioned to consider factors such as traffic and weather.
0400—TERMS AND CONDITIONS . :.
The following documents identify terms and conditions that together with the ITB, inclusive of all
appendixes and addenda, whether included herein or released under separate cover, comprise
the solicitation and the contract, and are complementary to one another and together establish
the complete terms, conditions and obligations of the bidder and, subsequently, the awarded
contractor.
1. SOLICITATION TERMS & CONDITIONS. By virtue of submitting a. bid in response to
this ITB, bidder agrees to be bound by and in compliance with the Solicitation Terms and
Conditions (dated 03/15/2019), incorporated herein, located at:
https://www.miam ibeachfl.gov/city-hall/procurement/standard-terms-and-conditions/
2. GENERAL CONDITIONS-FOR CONSTRUCTION CONTRACTS. By virtue of submitting
a bid in response to this ITS, bidder agrees that all work shall be bound by and in
compliance with the Terms and Conditions for Construction Contracts (dated
04/16/2019), incorporated herein, located at:
https://www.miamibeachfl.00v/city-hall/procurement/standard-terms-and-conditions/
12 2019-257-KB
MIAMIBEACH
APPENDIXA
Contractor
Qualification Form
FOR CONSTRUCTION PROJECTS
UST ESealktr ED ITH,T`,EBID
13 12019-257-KB
MIAM1BEACH
- Contractortlualification Form Instructions
Section 1, Required Form. The Contractor Qualification Form is a required form that must be submitted,
completed and executed, with the bid or within 3 days of request by the City. No bid will be considered without
the Contractor Form. Bidder's failure to submit this form as stipulated herein shall render its bid non-
responsive.
Section 2, Submittal Instructions.The Contractor Qualification Form will not be considered until it has been
submitted completed and executed by a principal of the applicant. Incomplete applications shall not be considered.
If requested information is not applicable, please indicate "NIA" or"None." If answers to questions are lengthier
than the spaces that are provided in the application, the answers may be provided on additional pages, which must
be attached to the application. All requested documents must also be attached to the application. Failure to
attach all requested documents will delay review and approval of the application.
The City reserves the right to request clarifications or additional information as deemed necessary to evaluate an
applicant's qualifications. When darfications or additional information is requested by the City,Applicants will have seven (7)
business days to provide, in full, all the requested information:Failure to provide the information within the prescribed
time will delaythe review process and n 'resuIt in denial of prequalification.
Part A—General Bidder Information.
FIRM NAME:
NO.OF YEARS IN BUSINESS: NO.OF YEARS IN BUSINESS NO.OF EMPLOYEES:
LOCALLY:
OTHER NAME(S)BIDDER HAS OPERATED UNDER IN THE LAST 10 YEARS:
FIRM PRIMARY ADDRESS(HEADQUARTERS):
CITY:
STATE: ZIP CODE:
TELEPHONE NO.:
TOLL FREE NO.:
FAX NO.:
•
FIRM LOCAL ADDRESS:
CITY:
STATE: ZIP CODE:
PRIMARY ACCOUNT REPRESENTATIVE FOR THIS ENGAGEMENT:
ACCOUNT REP TELEPHONE NO.:
ACCOUNT REP TOLL FREE NO.:
ACCOUNT REP EMAIL:
FEDERAL TAX IDENTIFICATION NO.:
APPLICANT FIRM IS:
CORPORATION / PARTNERSHIP / SOLE PROPRIETORSHIP / OTHER(If other,specify: L_.
14 12019-257-KB
MIAMIBEACH
15 I 2019-257-KB
MIAMIBEACH
Part B—Proposed Team.
1. Organizational Chart. Submit an organizational chart listing the proposed key personnel, their qualifications and
their roles in the project, resumes which shall include educational background, work experience, employment history,
and any other pertinent information. Where applicable, Bidder team members shall also submit current and valid
certifications and/or licenses for their individual scope of supervision. At a minimum, the bidder shall include the
following proposed project team members:
■ Construction Project Manager
• Construction Superintendent
2. Staffing Plan. Submit a staffing plan that clearly illustrates the key elements of the proposed organizational
structure. The staffing plan should indicate the availability of the personnel proposed to work on the Project. The
staffing plan should also indicate the name of the individual who will serve as the primary contact with City. Bidder
shall clearly detail the role of all sub-contractors proposed for the Project.
Part C—Operational&Management Information.
1. Provide the names of each owner (stockholder, sole proprietor, and partner), director, or officer of the
company,below.Submit additional names on a separate sheet if required.
Owner Ownership percentage Directorship/Office type
•
2. Provide three (3) residential renovation projects that the applicant has completed in the last five (5)
years.
Project Description of Work Project Reference
• Name:
Email:
Telephone:
Name:
Email:
•
Telephone:
Name:
Email:
Telephone:
3. Has the applicant company's construction license(s)been revoked during the last five(5)years?
YES NO
If yes, why?
16 I 2019-257-KB
MIAMIBEACH
4. Have any owners, directors, officers, or agents of the applicant company had a license revoked
during the last five(5)years?
YES NO
If yes,why?
5. Is the applicant company currently barred by a governmental agency, from bidding work as a prime or
subcontractor?
YES NO
If yes,state debarment period and the reason(s)for debarment?
6. Has a surety completed, or paid for completion, of a project on behalf of the applicant company,
within the last five(5)years?
YES NO
If yes,why?
7. Has the applicant company or any of its owners, directors, officers, or agents been convicted of a
crime or had a claim that was filed in a court and mediated or arbitrated during the last five (5)years?
YES NO
If yes,why?
8. Is an affiliate of the applicant company prequalified by the City of Miami Beach to bid on construction
work?
YES NO
If yes, state the name of the affiliate?
• 17 I 2019-257-KB
MIAMI BEACH
9. Is the applicant company a' parent, subsidiary, or holding company for another construction
company?
YES NO
If the answer is"yes,"identify the company and type of relationship(s), below:
Company Type of affiliation(parent or subsidiary) Period of affiliation
10. Is an owner,director,officer,or agent of theapplicant company affiliated with another company?
' YES II NO
If the answer is"yes,"provide the following information for each individual and the affiliated company.
Individual's name Affiliated company's name Period of Type of affiliation(e.g.
affiliation officer,director,owner or
employee)
11. Is the applicant company currently the debtor in a bankruptcy case or file for bankruptcy during the last
five (5)years?
YES NO
If yes,explain and attach, as applicable, the relevant case and court documents, including(but not limited to):the
original petition,'including the case number and the date that the petition was filed; a copy of the bankruptcy
court's discharge order, and any other document that ended the case, if no discharge order was issued.
12. Has any owner, director, officer, or agent for the applicant company, or has any business
organization in which any such person was an owner, director, officer, or agent filed for or been
discharged in bankruptcy within the ast five(5) ears?
YES NO
If yes, explain and attach a copy of the discharge order, order confirming plan and if a Corporate Chapter 7 case, a
copy of the notice of commencement.
13. Has any owner, director, officer, or agent of the applicant company owned or managed a construction
company under any other name in the last five(5)years?
18 12019-257-KB
MIAMI BEACH
YES NO
If yes, explain.
14. Has the applicant company been assessed or paid liquidated damages on any project during the past
five(5)years,whether the project was publicly orrivately owned?
.' YES IJ NO
If yes, explain.
15. Are there currently any liens, suits, or judgments of record pending against any owner, director,
officer,or agent for the companythat is related to construction activities of a business organization?
YES NO
If yes,explain.
•
16: Has the applicant company or any of its owners, officers, or partners ever been convicted (criminal)
or found liable (civil) for making either a false claim or material misrepresentation to any public agency
or entity?
If yes, explain.
17. Has the applicant company or any of its owners, officers, or partners ever been convicted of
any a federal or state crime?
' YES NO
If yes, explain.
18. Is any officer, director, employee or agent, or immediate family member (spouse, parent, sibling, and
child) of any officer,director,employee or agent, an em loyee of the City of Miami Beach?
YES INO
19 I 2019-257-KB
MIAMIBEACH
If yes,state name,title and share of ownership
Name Title Share(%)of Ownership
19. Has the applicant, or any officer, director,employee or agent,contributed to the campaign either directly
or indirectly, of a candidate who has been elected to the office of Mayor or City Commissioner for the
City of Miami Beach?
YES NO
If yes, provide details.
20. Pursuant to City Resolution No.2000-23879,each person or entity that seeks to do business with the City
shall adopt a Code. of Business Ethics ("Code"). Does the applicant maintain a corporate code of
business ethics?
YES NO
21a. If yes, attach. If no, will the applicant accept the City's code of ethics (available at available at
http://www.miamibeachfl. ovlci -hall/procurementlprocurernent=related-ordinance-and-procedures)?
YES NO
21. Pursuant to City Ordinance No.2016.3990,the City shall not enter into a contract with a business unless
the business representsthat it does not and will not engage in a boycott as defined in Section 2-375(a)
of the City Code, including the blacklisting,,divesting from, or otherwise refusing to deal witha person
or entity when such action is based on race, color, national origin, religion, sex, intersexuality, gender
identity, sexual orientation, marital or familial status, age or disability. Does the applicant agree to be
comply with this prohibition?
YES NO
22. Is the applicant a small business concern owned and controlled by a veteran(s)(certified by the State of
Florida Department of Management Services or a service-disabled veteran business enterprise (certified
by the United States Department of Veterans Affairs).
YES NO
Certifying Agency Certification Type
23. Equal Benefits for Employees with Spouses and Employees with Domestic Partners. Purchases hereunder
are subject to the requirements of Equal Benefits for Domestic Partners Ordinance 2005-3494 that requires suppliers
with more than 51 employees and City volume greater than $100,000 to provide "Equal Benefits"to their employees
with domestic partners, as they provide to employees with spouses. The Ordinance applies to all employees of a
supplier who works within the City limits of the City of Miami Beach, Florida; and the Contractor's employees located •
20 I 2019-257-KB
MIAMI BEACH
in the United States, but outside of the City of Miami Beach limits, who are directly performing work on the contract
within the City of Miami Beach.
A. Does the applicant provide or offer access to any benefits to employees with spouses or to spouses of
employees?
YES NO
B. Does your company provide or offer access to any benefits to employees with (same or opposite sex)domestic
partners*or to domestic partners of employees?
YES NO
C. Please check all benefits that apply to your answers above and list in the "other" section any additional benefits not
already specified. Note: some benefits are provided to employees because they have a spouse or domestic partner,
such as bereavement leave; other benefits are provided directly to the spouse or domestic partner, such as medical
insurance.
BENEFIT Firm Provides for Firm Provides for Firm does not
Employees with Employees with Provide Benefit
Spouses Domestic Partners
Health
Sick Leave
Family Medical Leave
Bereavement Leave
24. Moratorium on Travel to and the Purchase of Goods or Services from North Carolina and Mississippi.
Pursuant to Resolution 2016-29375, the City of Miami Beach, Florida prohibits the purchase of goods or services
sourced in North Carolina and Mississippi. Are any of the products for which the applicant is seeking to be
prequalified sourced in North Carolina or Mississippi?
YES NO
If yes, explain.
25. Non-Discrimination. Pursuant to City Ordinance No.2016-3990, the City shall not enter into a contract with a
business unless the business represents that it does not and will not engage in a boycott as defined in Section 2-
- 375(a)of the City Code, including the blacklisting, divesting from, or otherwise refusing to deal with a person or entity
when such action is based on race, color, national origin, religion, sex, intersexuality, gender identity, sexual
orientation, marital or familial status, age or disability.
SUBMITTAL REQUIREMENT: No additional submittal is required. By virtue of executing this affidavit document,
Proposer agrees it is and shall remain in full compliance with Section 2-375 of the City of Miami Beach City Code.
26. Fair Chance Requirement. Pursuant to Section 2-376 of the City Code, the City shall not enter into any contract
resulting from a competitive solicitation, unless the proposer certifies in writing that the business has adopted and
employs written policies, practices, and standards that are consistent with the City's Fair Chance Ordinance,set forth
in Article V of Chapter 62 of the City Code ("Fair Chance Ordinance"), and which, among other things, (i) prohibits
City contractors, as an employer, from inquiring about an applicant's criminal history until the applicant is given a
conditional offer of employment; (ii) prohibits advertising of employment positions with a statement that an individual
21 I 2019-257-KB
MIAMI BEACH
with a criminal record may not apply for the position, and (iii) prohibits placing a statement on an employment
application that a person with a criminal record may not apply for the position.
SUBMITTAL REQUIREMENT: No additional submittal is required at this time. By virtue of executing this affidavit,
Proposer certifies that it has adopted policies, practices and standards consistent with the City's Fair Chance
Ordinance. Proposer agrees to provide the City with supporting documentation evidencing its compliance upon
request. Proposer further agrees that any breach of the representations made herein shall constitute a material
breach of contract, and shall entitle the City to the immediate termination for cause of the Contract, in addition to any
damages that may be available at law and in equity.
CONTRACTOR QUALIFICATION FORM AFFIDAVIT
The undersigned agrees that s/he: 1) is a principal of the applicant duly authorized to execute the foregoing
Contractor Prequalification Certification Application, and that the contents of said document(s) are
complete, true, and correct to the best of his/her knowledge and belief; 2) s/certifies that the application
and supporting documents include all of the material information necessary to validate the status of the
company for prequalification purposes; 3) s/ shall notify the Procurement Department within fifteen (15)
days and provide a notarized statement whenever a change occurs in the ownership, management, or
financial condition of the company. Further, any prequalification applicant, including its principal(s),
director(s), and any affiliate, who is a party to any misrepresentation to obtain business or contracts with
the City of Miami Beach shall be declared delinquent and have its certificate suspended or revoked and
will be subject to debarment and any other penalties prescribed by law.
The undersigned affirms that the applicant agrees: 1) to complete and unconditional acceptance of the
terms and conditions of this document, inclusive of attachments, exhibits and appendices and the contents
of any Addenda released hereto; 2)that it has not colluded, nor will collude,with any other applicant; 3) that
all information contained herein is part of the public domain as defined by the State of Florida Sunshine and
Public Records Laws; 4) that all responses, data and information contained in the proposal are true and
accurate.
Name: Title(must be a principal of the applicant):
Signature: Date:
•
22 I 2019-257-KB
APPENDIX B
4 ,. „ ' s} ,
Bid Tender Form B1 )
-,Tail 'BE StlBMI4 Ii EB ITH lE'BID"FAILURE TO„E10 SO WILL RENDER:BID-NNON-
REPaNSNE. ° .
Acknowledgement of Addenda B2
ICE BE SUBMITTEDWITH THE BID FAILURE TO DO SO WILL'RENDER BillNON1-2
APo
• Y� � � • ' ` ; RESPONSIVE
23 I 2019-257-KB
MIAMI BEACH
Bid Tender Form (B1 )
Page 1 of 1
FAILURE TO SUBMITTHIS BID TENDER FORM FULLY COMPLETED AND EXECUTED ON OR BEFORE THE
DUE DATE FOR'BIDS- SHALL RENDER THE BID NON-RESPONSIVE AND BIDDER SHALL RECEIVE NO
FURTHER CONSIDERATION.
The TOTAL BASE BID amount includes the all-inclusive total cost for the work specified in this bid, consisting of
furnishing all materials, labor, equipment, shoring, supervision, mobilization, demobilization, overhead and profit,
insurance, permits,and taxes to complete the work to the full intent as shown or Indicated in the contract documents.
In the event of arithmetical errors,the Bidder agrees that the Adjustment Factors listed in the column titled"Bid
Adjustment Factor"shall govern and be used to calculate the division totals and total base bid. In absence of either
of the two (2)Adjustment Factors,the City shall interpret as no bid,which may disqualify bidder.
In the table below,the Bidder shall set forth Adjustment Factors in legible figures in the respective space provided.
The Contractor shall perform the Tasks required by each individual Job Order using the following Adjustment
Factors:
s r , ,„AdJUstmerat Facfor Name.,, r Bid AdJustment Facfor_ ;XJMultiplrer,;-11Divrsron_Tofal
1
-1111 Adjustment Factor for Normal Working X 0.80
Hours —• - - - - - - - -
2 Adjustment Factor for Other Than
Normal Working Hours X 0.20 –
4 r Add all the Total amounts in the right column.
sY
T= The Sum of these Total amounts is the Total Base Bid.
Notes To Bidder:
1. Specify lines 1 through 3 to four (4) decimal places. Use conventional rounding methodology (i.e., if the
number in the 5th decimal place is 0-4, the number in the 4th decimal remains unchanged; if the number in
the 5th decimal place is 5-9,the number in the 4th decimal is rounded upward).
2. The Other Than Normal Working Hours Adjustment Factors must be greater than or equal to the
Normal Working Hours Adjustment Factors.
3. The weighted percentage multipliers above are for the purpose of calculating a Total Base Bid only. No
assurances are made by the City that Work will be ordered under the Contract in a distribution consistent
with the weighted percentages above. The Total Base Bid is only used for the purpose of determining the
Bid.
4. When submitting Job Order Price Proposals related to specific Job Orders, the Bidder shall utilize one or
more of the Adjustment Factors applicable to the Work being performed.
24 I 2019-257-KB
Bidder's Affirmation
The undersigned, as Bidder, declares that the only persons interested in this Bid are named herein; that no other
person has any interest in this Bid or in the Contract to which this Bid pertains; that this Bid is made without
connection or arrangement with any other person; and that this Bid is in every respect fair and made in good faith,
without collusion or fraud. The Bidder agrees, if its Bid is accepted, to execute an appropriate City of Miami Beach
document for the purpose of establishing a formal contractual relationship between the Bidder and the City of Miami
Beach, Florida,for the performance of all requirements to which the Bid pertains.
Bidder: •
Authorized Agent Name:
Authorized Agent Title:
Authorized Agent Signature:
25 I 2019-257-KB
Acknowledgement of Addenda (B2)
Page 1 of l
Aff�� i,C'J1J;]3t j r • is i ,Arf101)(1rr ,.�4 i
Amendment 1 Amendment 6
Amendment 2 Amendment 7
Amendment 3 Amendment 8
Amendment 4 Amendment 9
Amendment 5 Amendment 10
Bidder: Initials:.
26 I 2019-257-KB
APPENDIX C
•
/
}
GENERAL CONDITIONS
FOR
JOB ORDER CONTRACTS
27 2019-257-KB
MIAMI BEACH
GENERAL'CONDITIONS FOR JOB ORDER CONTRACTS
ARTICLE 1. DEFINITIONS AND INTERPRETATION OF CONTRACT OR JOB ORDER OR
JOB ORDER DOCUMENTS.
1.1. Definitions. The definitions included in this Section are not exhaustive of all definitions
used in the Contract or Job Order or Job Order Documents. Additional terms may be defined in
other'Contract or Job Order or Job Order Documents. The following terms shall have the
meanings specified herein, as follows:
"Applicable Laws" means all laws, codes (including, ,but not limited to, building codes),
ordinances, rules regulations, lawful orders and decrees of governmental authorities having
jurisdiction over the Project, Project Site, or the Parties.
"Application for Payment" means the detailed itemized documentation, including all supporting
documentation, in a form and substance satisfactory to the City, submitted by the Contractor on a
monthly basis in order to obtain the City's approval for payment for Work performed pursuant to the
Contract or Job Order or Job Order Documents.
"Bid" means an offer or proposal submitted by a bidder in response to this ITB. The terms "Bid"
and "Bid Submittal"are used interchangeably.
"Bidder" means any individual or firm submitting a Bid for this Project."
"Change Order" means a written document ordering a change in the Contract.
"CIP Inspector/PWD Field Observer" means a City employee charged with observing and
documenting, for internal City purposes only, general observations and conditions of the Project
including, without limitation, the weather conditions, the number of workers present at the time of
observation, general type of work being performed and taking photographs regarding same.
Contractor expressly waives any right to assert as a defense to any claim regarding the Project
including, without limitation, any dispute between the City and Contractor, and Contractor and any
third party, the presence or purported approval or consent of any CIP Inspector or other City
employee conducting any field observations during the Project. The Contractor expressly
acknowledges that the purpose of such City employee is to observe and document for internal
purposes only general observations and conditions of the Project, and in no way is intended to, nor
shall be treated as, a person with authority to approve or reject the Work on behalf of the City or any
other entity, or to direct the Contractor's Work in any way. Contractor expressly agrees to waive the
presence of such CIP Inspector or other City employee performing field observations as a defense
to any Claims involving the Project.
"City" means the City of Miami Beach, a Florida municipal corporation, having its principal offices
at 1700 Convention Center Drive, Miami Beach, Florida 33139. In all respects hereunder, City's
obligations and performance is pursuant to City's position as the owner of the Project acting in its
proprietary capacity. In the event City exercises its regulatory authority as a governmental body
28 I 2019-257-KB
•
including, but not limited to, its regulatory authority for code inspections and issuance of Building
Department permits, Public Works Department permits, or other applicable permits within its
jurisdiction, the exercise of such regulatory authority and the enforcement of any rules, regulations,
laws and ordinances shall be deemed to have occurred pursuant to City's regulatory authority as a
governmental body and shall not be attributable in any manner to City as a Party to this Contract.
"City Commission" means the governing and legislative body of the City.
"City Manager" means the Chief Administrative Officer of the City. The City Manager shall be
construed to include the Contract or Job Order or Job Order Administrator and any duly authorized
representatives of the City as the City Manager may designate in writing at any time with respect to
any specific matter(s) concerning the Project and/or the Contract or Job Order Documents •
(exclusive of those authorizations reserved to the City Commission or regulatory or administrative
bodies having jurisdiction over any matter(s) related to the Project and/or the Contract or Job Order
or Job Order Documents).
"Claim" means a demand or assertion by one of the parties seeking, as a matter of right,
•
adjustment or interpretation of the Contract or Job Order or Job Order Documents, payment of
money, extension of time or other relief with respect to the Contract or Job Order Documents or
Project. The term "Claim" also includes other disputes and matters in question between the City
and Contractor arising out of or relating to the Contract or Job Order or Job Order Documents.
Claims must be initiated by written notice in strict accordance with the Contract or Job Order or Job
Order Documents. The responsibility for substantiating Claims shall rest with the Party making the
Claim. All Claims submitted by Contractor must comply with the requirements of the City's False
Claims Ordinance, as set forth in Sections 70-300 et seq., of the City Code, or shall be forfeited in
accordance with the terms of the False Claims Ordinance and conclusively waived and released.
"Consultant" means the firm named in the Invitation to Bid Summary as the "Consultant,"that has
entered into a separate agreement with the City to perform architectural, engineering, or other
design and construction administration services for the Project, and who will serve as the"architect
of record" and/or "engineer of record" for the Project. Wherever the word "Architect" or"Engineer"
or"Consultant" appears in the Contract or Job Order or Job Order Documents, it shall be deemed
to refer to the Consultant and/or the design professionals engaged by the Consultant. All
communications, directives, instructions, interpretations and actions required of Consultant shall be
issued or taken only by or through Consultant's authorized representative(s).
•
"Construction Superintendent" means the individual who is a representative of the Contractor,
and who shall be responsible for continuous field supervision, coordination, and completion of the
Work, and who shall maintain a full-time on-site, physical presence at the Project Site and satisfy the
obligations of Construction Superintendent as provided in the Contract or Job Order or Job Order
Documents.
"Contract" means the written agreement between the City and the Contractor for the performance
of the Work in accordance with the requirements of the Contract or Job Order or Job Order
Documents, and for the payment of the agreed consideration.
"Contract or Job Order or Job Order Administrator" means the City's Contract or Job Order or
Job Order Administrator shall mean the individual appointed by the City Manager who shall be the
29 12019-257-KB
City's authorized representative to coordinate, direct,,and review on behalf of the City, all matters
related to the Project. The initial Contract or Job Order or Job Order Administrator for the Project is
named in the Invitation to Bid Summary.
"Contract or Job Order or Job Order Documents" means all of the documents setting forth bidding
information, requirements and contractual obligations for the Project, including this ITB, Contractor's Bid in
response thereto, the Contract, together with all'addenda to any of the foregoing Change Orders, the
Construction Task Catalog®, Technical Specifications, and all Job Orders and any related documentation
including but not limited to the Detailed Scope of Work,Job Order Proposal, Field Orders, Supplemental Job
Orders,schedules and shop drawings,and all other documents required by the ITB for the completion of the
Project.
"Contract Job Order Price" means the amount established in the Job Order Price Proposal as the
total amount the City is obligated to pay for full and complete performance of all of the Work
required by the Contract or Job Order Documents (including, but not limited to, all labor, equipment
and materials to administer, coordinate, provide related certifications, install and otherwise
construct and complete the Project within the Contract or Job Order Time), and as may be
amended by Change Order. -
"Contract or Job Order Time" means the number of days allowed for completion of all Work, as
stipulated in the Contract or Job Order or Job Order Documents, and as may be amended by
Change Order.
"Contractor" means the individual or firm whose Bid is accepted and who enters into the Contract
or Job Order or Job Order with the City to construct the Project pursuant to the Contract or Job
Order Documents and who is liable for the acceptable performance of the Work and payment of all
debts pertaining to the Work.
"Days" means all references to numbers of days in the Contract or Job Order or Job Order
Documents, shall be construed to mean calendar days, unless specifically noted otherwise. The
term "business days" means a day other than a Saturday, Sunday, Federal holiday or any day on
which the principal commercial banks located in Miami-Dade County, Florida are not open for
business during normal hours.
"Field Order" or "Field Directive" means a written order which further describes details or
provides interpretations necessary to complete the Work of the Contract or Job Order Documents
but which does not involve a change in the Contract Job Order Price or Contract or Job Order
Time.
"Final Completion" means the date upon which all conditions and requirements of the Contract or
Job Order or Job Order Documents, permits and regulatory agencies have been satisfied; any
documents required by the Contract or Job Order Documents have been received by the City; any
other documents required to be provided have been received by City; and the Work has been fully
completed in accordance with the Contract or Job Order or Job Order Documents.
JOC Specific Definitions: Whenever the following terms or pronouns in place of them appear in
the Project Manual, the intent and meaning shall be interpreted as follows:
30 I 2019-257-KB
"Adjustment Factor" means a competitively bid adjustment to be applied to the Unit
Prices listed in the Construction Task Catalog®.
"Base Term" means the initial period of the Contract or Job Order or Job Order and does
not include any Option Terms.
"Construction Task Catalog®" means a comprehensive listing of construction related
tasks together with a specific unit of measure and a published Unit Price.
"Detailed Scope of Work" means a document setting forth the work the Contractor is
obligated to complete for a particular Job Order.
"Estimated Annual Value" means an estimate of the value of Job Orders the City may
issue each year.
"Job Order" means a written order issued by the City, such as a Purchase Order,
requiring the Contractor to complete the Detailed Scope of Work within the Job Order
Completion Time for the Job Order Price. A project may consist of one or more Job
Orders.
"Job Order Price Proposal" means a price proposal prepared by the Contractor that
includes the Pre-priced Tasks, Non Pre-priced Tasks, quantities and appropriate
Adjustment Factors required to complete the Detailed Scope of Work.
"Job Order Proposal" means a set of documents including at least: (a) Job Order Price
Proposal; (b) required drawings or sketches; (c) list of anticipated Subcontractors; (d)
Construction schedule; and (e) other requested documents.
"Joint Scope Meeting" means a site meeting to discuss the work before the Detailed
Scope of Work is finalized.
"Non Pre-priced Task" means a task that is not set forth in the Construction Task
Catalog®.
"Normal Working Hours" means the hours contained in the applicable noise ordinance,
and in the event there is no applicable noise ordinance, means the hours from 7:00 a.m. to
4:00 p.m. Monday through Friday, except for City holidays.
"Notice to Proceed" means a written notice issued by the City directing the Contractor to
proceed with construction activities to complete the Job Order.
"Option Term" means an additional period of time beyond the Contract or Job Order or
Job Order Term which extends the termination date of the Contract.
•
31 I 2019-257-KB
"Other than Normal Working Hours" means the hours outside the applicable noise
ordinance, and in the event there is no applicable noise ordinance, means the hours of
4:01 p.m. to 6:59 a.m. Monday through Friday and all day Saturday, Sunday, and City
Holidays.
"Pre-priced Task" means a task described in, and for which a Unit Price is set forth in,
the Construction Task Catalog®.
"Project" means the collective improvements to be constructed by the Contractor
pursuant to a Job Order, or a series of related Job Orders.
"Request for Proposal" means a written request to the Contractor to prepare a Proposal
for the Detailed Scope of Work referenced therein.
"Supplemental Job Order" means a secondary Job Order developed after the initial Job
Order has been issued for the purpose of changing, deleting, or adding work to the initial
Detailed Scope of Work, or changing the Job Order Completion Time.
Technical Specifications: The written requirements for materials, equipment, systems,
standards and workmanship for the Work, and performance of related services.
"Total Base Bid" means the sum of the column titled "Extended Total" on the ITB Price
Form,which is used for the purposes of determining the lowest price.
"Unit Price" means the price published in the Construction Task Catalog® for a specific
construction or construction related work task. Unit Prices for new Pre-priced Tasks can be
established during the course of the Contract or Job Order or Job Order and added to the
Construction Task Catalogs®. Each Unit Price is comprised of labor, equipment, and
material costs to accomplish that specific Pre-priced Task.
"Notice(s) to Proceed" or "NTP" means a written letter or directive issued by the Contract or
Job Order or Job Order Administrator to Contractor to commence and proceed with portions of the
Work as specified therein or a specific task of the Project, and stating any further limitations on the
extent to which Contractor may commence and proceed with the Work. Unless otherwise
approved by the City at its sole discretion, City's issuance of a Notice to Proceed for construction
or portions thereof shall be contingent upon Contractor obtaining all appropriate permits and
satisfying all requirements of agencies having jurisdiction. However, the City is not obligated to
immediately issue NTP on the date Contractor obtains all requisite permits and/or satisfies the
specified conditions precedent for issuance of NTP. The date of issuance of NTP shall be
determined at the City's sole discretion once Contractor has obtained all required permits and
otherwise satisfied all conditions precedent to issuance of NTP.
"Owner's Contingency" means that separate fund which is available for City's use at its sole
discretion to defray additional expenses relative to the design and construction of the Project, as
well as additional expenses expressly chargeable to the ;City or otherwise deemed the
responsibility of the City pursuant to the Contract or Job Order or Job Order Documents. The City
32 I 2019-257-KB
retains exclusive use and control of the Owner's Contingency. The Contractor has no right or
entitlement whatsoever to the Owner's Contingency, and use of such funds are subject to the
Contract or Job Order or Job Order Administrator's or City Manager's prior written approval and
issuance of a Change Order by the City at its sole and absolute discretion. Any unused City
Contingency remaining at the completion of the Project shall accrue solely to the City.
"Parties" means City and Contractor, and "Party"is a reference to either City or Contractor, as the
context may indicate or require.
"Plans" means the drawings or reproductions thereof prepared by the Consultant, which show the
location, character, dimensions and details of the Work to be done, and which are a part of the
Contractor Job Order or Job Order Documents.
"Project" means the construction project described in the Detailed Scope of Work, including
pursuant to a Job Order, or a series of related Job Orders.
"Project Initiation Date" means the date upon which the Contract or Job Order Time commences.
"Project Manager" means the authorized individual which is the representative of Contractor and
who will administer and manage the prosecution of all Work on behalf of the Contractor.
"Punch List" means the list or lists prepared by Contractor, incorporating input provided by the
City or Consultant, identifying matters that remain to be completed to achieve Substantial
Completion and to be completed between achievement of Substantial Completion and Final
Completion in order that Final Completion can be declared by City to have occurred.
"Purchase Order" means the written document issued by the City to the Contractor indicating
types, quantities, and/or agreed prices for products or services to be provided to the City.
"Responsible Bidder" means an offeror who has the capability in all respects to perform fully the
Contract or Job Order or Job Order requirements, and the integrity and reliability which will assure
good faith performance, including, without limitation, the factors identified in Section 2-369 of the
City Code.
"Responsive Bidder" means a person or entity who has submitted a bid which conforms in all
material respects to a solicitation. A bid or proposal of a Responsive Bidder must be submitted on
the required forms, which contain all required information, signatures, notarizations, insurance,
bonding, security, or other mandated requirements by the bid documents to be submitted at the
time of bid opening.
"Schedule of Values" means a written schedule setting forth the detailed and itemized cost
breakdown, inclusive of labor, material, and taxes of all elements comprising the Contract Job
Order Price.
"Specifications" means the general term comprising all of the written directions, provisions and
requirements contained in the Contract or Job Order or Job Order Documents, as amended,
33 I 2019-257-KB
describing the work required to be performed, including detailed technical requirements as to labor,
materials, supplies, equipment and standards to which such work is to be performed.
"Subcontractor" means any person or entity supplying the Contractor with labor, materials,
supplies or equipment used directly or indirectly by the Contractor in the prosecution of the Work.
"Substantial Completion" means the date when the Work, as certified in writing by the
Consultant, and determined by the City in its sole discretion, has been developed, designed,
engineered and constructed in accordance with the Contract or Job Order Documents such that all
conditions of permits and regulatory agencies have been satisfied and the Project is ready for
occupancy, utilization and continuous commercial operation for the uses and purposes intended by
the City, without material interference from incomplete or improperly completed Work and with only
minor punch list items remaining to be completed, all as reasonably determined by the City and
evidenced by (1) the issuance of a Certificate of Occupancy or Certificate of Completion by the
authority having jurisdiction; (2) the issuance of a Certificate of Substantial Completion by the
Consultant; and (3) acceptance of such Certificate of Substantial Completion by the City pursuant
to the Contract or Job Order or Job Order Documents.
"Surety" means the surety company or individual which is bound by the bid bond, or by the
performance bond or payment bond with and for Contractor who is primarily liable, and which
surety company or individual is responsible for Contractor's satisfactory performance of the work
under the Contract or Job Order or Job Order and for the payment of all debts pertaining thereto in
accordance with Section 255.05, Florida Statutes.
"Work" means all construction and services required by or reasonably inferable from the Contract or Job
Order Documents and Detailed Scope of Work for the completion of the Project, including the provision of all
labor, materials, equipment, supplies, tools, machinery, utilities, procurement, fabrication, transportation,
construction, erection, demolition, installation, insurance, bonds, permits and conditions thereof, building
code changes and governmental approvals, testing and inspection services, quality assurance and/or
quality control inspections and related certifications, training, surveys, studies, supervision, and
administration services to be provided by the Contractor, and other items, work and services that are
necessary or appropriate for the total construction, installation, furnishing, equipping, and functioning of the
completed Project, together with all additional, collateral and incidental items,work and services required to
achieve Final Completion in accordance with the Contract or Job Order or Job Order Documents.
1.2. Interpretation of the Contract or Job Order or Job Order Documents.
1.2.1. As used in the Contract or Job Order or Job Order Documents, (i) the singular shall include
the plural, and the masculine shall include the feminine and neutral, as the context requires; (ii)
"includes" or"including"shall mean "including, but not limited to" and "including, without limitation;"
and (iii) all definitions of agreements shall include all amendments thereto in effect from time to
time.
1.2.2. Whenever it shall be provided in the Contract or Job Order Documents that the Contractor
is required to perform a service or obligation "at its sole cost and expense" or words of substantially
similar meaning, the Contractor shall not be entitled to reimbursement for such item and the cost of
such service or obligation shall not be included in any Application for Payment.
34 1 2019-257-KB
1.2.3. Contract or Job Order Documents shall be construed in a harmonious manner, whenever
possible. The general intent of the Contract or Job Order Documents is to include all items
necessary for the proper execution and completion of the Project by the Contractor.
1.2.4. The Contract or Job Order Documents shall be taken as a whole and are complementary,
and any item of Work called for in any Contract or Job Order or Job Order Document shall be as
binding as if called for by all, so that any part of the,Work shown or described in any of the Contract
or Job Order or Job Order Documents, though not specifically referred to in other Contract or Job
Order or Job Order Documents, shall be executed by Contractor and binding as a part of the
Contract or Job Order or Job Order Documents, as well as any Work which, in the sole opinion of
City, may be fairly inferred from the Contract or Job Order Documents or by normal industry
practice.
1.2.5. Detailed plans shall take precedence over general plans for the same part of the Work.
Specifications and detailed plans which may be prepared or approved by City after the execution of
the Contract or Job Order or Job Order and which may be fairly inferred from the original
specifications and plans are to be deemed a part of such specifications and plans, and that portion
of the Work shown thereby shall be performed without any change in the Job Order Price or
Project Schedule. With respect to conflicts between large-scale drawings and small-scale drawings,
the larger scale drawing shall govern, unless otherwise dictated by Consultant.
1.2.6. Where compliance with two or more requirements is indicated in any of the enumerated
Contract or Job Order Documents and where these requirements within the Contract or Job Order
Documents•conflict in quantity or quality, the Contractor shall comply with the most stringent
requirement as determined by the City, unless specifically indicated otherwise in the Contract or Job
. Order or Job Order Documents.
1.2.7. As used in the Contract or Job Order or Job Order Documents, unless specifically
indicated otherwise, references to an Article include all Sections, Subsections, and items within
that Article; references to a Section include all Subsections and items within that Section; and
references to a Subsection include all items within that Subsection.
1.2.8. Words which have a well-known technical or trade meaning are used herein in accordance
with such recognized or well-known meaning, unless the Contract or Job Order Documents
otherwise specifically define such word.
1.2.9. The Recitals, Appendices, Exhibits and Schedules attached hereto are expressly
incorporated in and made a part of the Contract or Job Order Documents as if fully set forth herein.
ARTICLE 2. INTENTION AND PRIORITY OF CONTRACT OR JOB ORDER OR JOB ORDER
DOCUMENTS.
2.1. Intention of City. It is the intent of City to describe in the Detailed Scope of Work a functionally
complete Project (or part thereof) to be constructed in accordance with the Contract or Job Order
Documents and in accordance with all codes and regulations governing construction of the Project. Any
work, materials or equipment that may reasonably be inferred from the Contract or Job Order Documents as
35 I 2019-257-KB
being required to produce the intended result shall be supplied by Contractor whether or not specifically
called for. City shall have no duties other than those duties and obligations expressly set forth within the
Contract or Job Order or Job Order Documents.
2.2. Priority of Contract or Job Order or Job Order Documents. In the event of conflict or
inconsistency among the Contract or Job Order or Job Order Documents,the following order of precedence
shall govern the interpretation of the Contract or Job Order or Job Order Documents:
a. Change Orders or Amendments to this Contract or Job Order or Job Order (excluding the
Plans and Specifications);
b. Appendix F,The JOC Supplemental Conditions;
c. The Contract or Job Order Documents(excluding the Plans and Specifications);
d. The Construction Task Catalog®;
e. Modifications or changes to the completed Plans and Specifications, as approved by the City;
f. The completed Plans and Specifications, as approved by the City;
g. The Technical Specifications;and
h. The ITB.
In the event of any conflict between the General Terms and Conditions of the ITB (as may be amended by
Change Order), and the Specifications, the provisions of the General Terms and Conditions, as amended,
shall take precedence and control.
Contractor shall be furnished two (2) copies, free of charge, of the Contract or Job Order or Job
Order Documents, excluding the Construction Task Catalog® and Technical Specifications; which
shall be preserved and always kept accessible to the City, the Consultant, and their respective
authorized representatives. Additional copies of the Contract or Job Order Documents may be
obtained from City at the cost of reproduction.
ARTICLE 3. CONTRACTOR'S DUTIES AND RESPONSIBILITIES.
3.1. Performance of the Work. The Contractor covenants and warrants that it shall be
responsible for performing and completing, and for causing all Subcontractors to perform and
complete, the Work in accordance with the Contract or Job Order Documents and all Applicable
Laws relating to the Project. Accordingly, Contractor shall furnish all of the labor, materials,
equipment services and incidentals necessary to perform all of the Work described in the Contract
or Job Order or Job Order Documents, and all Work that is contemplated thereby or reasonably
inferable therefrom. As part thereof, Contractor shall achieve Substantial Completion within the
time period specified in the Invitation to Bid Summary for Substantial Completion, as such date
may be extended pursuant to the terms of the Contract or Job Order or Job Order Documents, and
shall achieve Final Completion of the Project by the date established in the Contract or Job Order
Documents for Final,Completion, as such date may be extended pursuant to the terms of the
Contract or Job Order or Job Order Documents. Unless otherwise provided in the Contract or Job
36 I 2019-257-KB
•
Order or Job Order Documents, or as agreed to in writing between City and Contractor, the form
and content of all reports, forms and regular submittals by Contractor to City shall be subject to
prior approval of the City, and Contractor shall submit such materials to the City for City's approval
prior to implementation. City's approval thereof shall not limit City's right to thereafter require
reasonable changes or additions to approved systems, reports, forms and regular submittals by
Contractor to City.
3.2. Standard of Care. The Work shall be performed in accordance with the professional
standards applicable to projects, buildings, or work of complexity, quality and scope comparable
to the Work and the Project. More specifically, in the performance of the professional services
under this Contract, Contractor shall provide the care and skill ordinarily used by members of its
profession practicing under similar conditions for projects of similar type, size and complexity at
the same time and locality of the Project. Work shall be performed by the Contractor,
Subcontractors, and specific personnel referred to in the in the Contract or Job Order Documents
in accordance with their respective degrees of participation provided and represented to the City
by the Contractor from time to time. The Contractor may add Subcontractors as it deems
necessary or appropriate in order to carry out its obligations under the Contract or Job Order or
Job Order Documents, provided such entity shall be suitably qualified and shall be subject to the
prior approval of the City. Nothing contained in the Contract or Job Order Documents shall be
construed to create any obligation or contractual liability running from the City to any such
persons or entities, including to any Subcontractors.
3.3. .Notices to Proceed. Contractor shall be instructed to commence the Work by written
instructions in the form of a Purchase Order issued by the City's Procurement Department and a
Notice to Proceed issued by the Contract or Job.Order or Job Order Administrator. At least two (2)
Notices to Proceed will be issued for this Contract. Contractor shall commence scheduling
activities, permit applications and other preconstruction work within five (5) calendar days after the
Project Initiation Date, which shall be the same as the date of the first Notice to Proceed. The first
Notice to Proceed and Purchase Order will not be issued until Contractor's submission to City of all
required documents, includingbut not limited to, Payment Bond, Performance Bond, and Insurance
Certificate(s), and after execution of the Contract or Job Order or Job Order by both parties.
3.4. Conditions Precedent to Notice to Proceed for Construction of the Work. The
following are conditions precedent to the issuance of a Notice to Proceed to authorize Contractor to
mobilize on the Project Site and commence with physical construction of the Work (typically, the
second NTP for a Project): (1) the receipt of all necessary permits by Contractor; (2) City's
acceptance of the Contractor's full progress schedule in accordance with the Contract or Job Order
or Job Order Documents, Contractor's submittal schedule, Contractor's Schedule of Values, and
list of Subcontractors; (3) Contractor's Hurricane Preparedness Plan; and (4) Contractor's
submission to the City and Consultant of any other documents required by the Contractor
Documents. The Contractor shall submit all necessary documents required for issuance of the
Notice to Proceed with construction of the Work within twenty-one (21) calendar days of the
issuance of the first Notice to Proceed.
3.5. Warranty. Contractor warrants to City that all materials and equipment furnished under
this Contract or Job Order or Job Order will be new unless otherwise specified and that all of the
Work will be of good quality, free from faults and defects and in conformance with the Contract or
37 I 2019-257-KB
Job Order or Job Order Documents, All work not conforming to these requirements, including
substitutions not properly approved and authorized, may be considered defective. If required by
Consultant or City, Contractor shall furnish satisfactory evidence as to the kind and quality of
• materials and equipment. This warranty is not limited by any other provision of the Contract or Job
Order or Job Order Documents.
3.6. Personnel Requirements.
3.6.1. The orders of City are to be given through Consultant or the Contract or Job Order or Job
Order Administrator, which instructions are to be strictly and promptly followed in every case.
Contractor shall keep on the Project during its progress, a full-time competent English speaking
Construction Superintendent and any necessary assistants, all satisfactory to City. The
Construction Superintendent shall not be changed except with the written consent of City, unless
the Construction Superintendent proves to be unsatisfactory to Contractor and ceases to be in its
employ. The Construction Superintendent shall represent Contractor and all directions given to the
Construction Superintendent shall be as binding as if given to Contractor and will be confirmed in
writing by City upon the written request of Contractor. Contractor shall give efficient supervision to
the Work, using its best skill and attention.
3.6.2. The Construction Superintendent shall be responsible for management of the Project Site
and tasks, including, but not limited to, organization and coordination of the Work of Subcontractor
employees; exercising control over rate of construction progress to assure completion of the
Project within the Project Schedule; inspecting or observing the Work to enforce conformity to
the Contract or Job Order Documents and supervising trades, subcontractors, clerical staff, and
other personnel employed in the construction of the Project. On a daily basis, Contractor's
- Construction Superintendent shall record, at a minimum, the following information in a bound log:
the day; date; weather conditions and how any weather condition affected progress of the Work;
time of commencement of work for the day; the work being performed; materials, labor, personnel,
equipment and subcontractors at the Project Site; visitors to the Project ,Site, including
representatives of Consultant; regulatory representatives; any special or unusual conditions or
occurrences encountered; and the time of termination of work for the day. All information shall be
recorded in the daily log in ink. The daily log shall be kept on the Project Site and shall be
available at all times for inspection and copying by City and Consultant.
3.6.3. The Contract or Job Order or Job Order Administrator, Contractor and Consultant shall
meet at least weekly or as determined by the Contract or Job Order or Job Order Administrator,
during the course of the Work to review and agree upon the work performed to date and to
establish the critical path activity or Work for the next two weeks. The Consultant shall publish,
keep, and distribute minutes and any comments thereto of each such meeting.
3.6.4. If Contractor, in the course of prosecuting the Work, finds any discrepancy between the
Contract or Job Order,Documents and the physical conditions of the locality, or any errors,
omissions, or discrepancies in the Contract or Job Order or Job Order Documents, it shall be
Contractor's duty to immediately inform Consultant, in writing, and Consultant will promptly review
the‘same. Any work done after such discovery, until authorized, will be done at Contractor's sole
risk.
38 I 2019-257-KB
3.6.5. Contractor shall supervise and direct the Work competently and efficiently, devoting such
attention thereto and applying such skills and expertise as may be necessary to perform the Work
in accordance with the Contract or Job Order or Job Order Documents. Contractor shall be solely
responsible for the means, methods, techniques, sequences and procedures of construction.
3.6.6. The Construction Superintendent must have at least five (5) years of experience in
projects of similar design, scope, size and complexity. The Project Manager must have at least
five (5)years of experience in projects of similar design, scope, size and complexity.
3.7. Subcontracts.
• 3.7.1. Contractor shall not employ any subcontractor against whom City or Consultant may have
a reasonable objection. Contractor shall not be required to employ any subcontractor against
whom Contractor has a reasonable objection.
3.7.2. Contractor shall be fully responsible for all acts and omissions of its subcontractors and of
persons directly or indirectly employed by its subcontractors and of persons for whose acts any of
them may be liable to the same extent that Contractor is responsible for the acts and omissions of
persons directly employed by it. Nothing in the Contract or Job Order Documents shall create any
contractual relationship between any subcontractor and City or any obligation on the part of City to
pay or to see the payment of any monies due any subcontractor. City or Consultant may furnish to
any subcontractor evidence of amounts paid to Contractor on account of specific work performed.
3.7.3. Contractor agrees to bind specifically every subcontractor to the terms and conditions of
the Contract or Job Order Documents for the benefit of City. All of the Contractor's agreements
with the Subcontractors shall contain the following provisions (or shall incorporate the following
provisions by reference) and shall state:
a. that the Subcontractor irrevocably submits itself to the original and exclusive
jurisdiction and venue in Miami-Dade County, Florida, with regard to any controversy in any way
relating to the award, execution or performance of the Contract or Job Order Documents and/or
such Subcontractor's agreement, and whereby the Subcontractor agrees that service of process on
it may be made to the person or entity designated in the Subcontract;
b. that the City shall not be in privity of Contract or Job Order or Job Order with the
Subcontractor and shall not be liable to any Subcontractor under the Contract or Job Order
Documents orany such subcontract, except for the payments of amounts due to the Subcontractor
under its subContract or Job Order or Job Order in the event that the City exercises its rights under
any assignment of the subContract or Job Order or Job Order and requests or directs the
Subcontractor to perform the portion of the Work covered by its subcontract;
c. that the City is a third-party beneficiary of the Subcontract, entitled to enforce any
rights thereunder for their respective benefits, and that, subject to the terms of the applicable
Subcontract, the City shall have the same rights and remedies vis-à-vis such Subcontractors that
Contractor shall have, including the right to be compensated for any loss, expense or damage of
any nature whatsoever incurred by the City resulting from any breach of such Sub Contract or Job
Order or Job Order by Subcontractor, any breach of representations and warranties, if any,
39 I 2019-257-KB
implied or expressed, arising out of such agreements and any error, omission or negligence of
such Subcontractor in the performance of any of its obligations under such Subcontract;
d. that the Subcontractor shall indemnify and hold harmless the City, its officers,
agents, directors, and employees, and instrumentalities to the fullest extent permitted by Section
725.06 of the Florida Statutes;
•
e. that such subContract or Job Order or Job Order shall be terminable for default or
convenience upon ten (10) days prior written notice by Contractor, or, if the SubContract or Job
Order or Job Order has been assigned to the City, by the City or its designee;
f. that Subcontractor shall promptly notify the City (with a copy to Contractor) of any
default of Contractor under the Subcontract,whether as to payment or otherwise;
g. that Contractor and Subcontractor acknowledge that(i) they are each entering into
a Contract or Job`Order or Job Order for the construction of a public facility or public works project
as contemplated in Chapter 255, Florida Statutes, and (ii) each have no right to file a construction
lien against the Work or the Project, and further agree to include a similar requirement in any
purchase order or subContract or Job Order or Job Order entered into by Subcontractor; and (iii)
the payment bond provided by Contractor pursuant to this Agreement is a substitute for the right to
claim a lien on the Project, and that any claims for nonpayment shall be made against the bond in
accordance with Section 255.05, Florida Statutes.
• h. that Subcontractor shall comply with all Applicable Laws- (including prompt
payment) and the City requirements as set forth in the Contract or Job Order Documents and
maintain all files, records, accounts of expenditures for Subcontractor's portion of the Work to'the
standards set forth in the Contract or Job Order or Job Order Documents.
that the City may, at reasonable times, contact Subcontractor, after notice to
Contractor, to discuss, or obtain a written report of, Subcontractor's services, with Contractor
entitled to be present during any such discussions; provided that in no event, prior to any
assignment of the SubContract or Job Order or Job Order to the City, shall Subcontractor take
instructions directly from the City;
j. that Subcontractor promptly disclose to the City and Contractor any defect,
omission, error or deficiency in the Contract or Job Order Documents or the Work about which it
has knowledge no later than ten (10) days following discovery of such defect, omission, error or
deficiency;
k. that Subcontractor assign all warranties directly to the City,
that the Contract or Job Order Documents provide a limitation of remedies and NO
DAMAGES FOR DELAY as delineated in Article 10 hereof;
m. that in the event of a change in the Work the Subcontractor's Claim for
adjustments in the subContract Job Order Price shall be limited exclusively to its actual costs for
40 I 2019-257-KB
such changes, plus no more than the overhead and profit fees/markups and bond costs to be
established as part of the GMP Amendment.
n. Each subContract or Job Order or Job Order shall require the Subcontractor to
expressly agree that the foregoing constitutes the sole and exclusive remedies for delays and
changes in the Work and thus eliminate any other remedies for claim for increase in the
subContract Job Order Price, damages, losses or additional compensation.
•
o. Each subContract or Job Order or Job Order shall require that any claims by
Subcontractor for delay or additional cost must be submitted to Contractor within the time and in
the manner in which the Contractor must submit Claims to the City, and that failure to comply with
the conditions for giving notice and submitting claims shall result in the waiver of such claims in the
same manner as provided for in the Contract or Job Order or Job Order Documents.
3.7.4. Contractor shall perform the Work with its own organization, amounting to not less
than the percentage of work specified below:
•ti�_ is 6 ##r]J. z oY `�;.�3 - s./r�t""`'",TSK`�7.a
".1t-,r.r." :.}o.. .. �� Vrad j,�v.. a ��-'tt ?A, �Lf rT a �V� O ^fV.Y
General Construction 10%
Horizontal Right-of-Way 30%
Electrical Construction 30%
Roofing 51%
Landscaping 51%
3.8. Plans and Working Drawings.
3.8.1. Contractor to Check Plans, Specifications and Data: Contractor shall verify all dimensions,
quantities and details shown on the Detailed Scope of Work, plans, specifications or other data
received from Consultant, and shall notify Consultant of all errors, omissions and discrepancies
found therein within three (3) calendar days of discovery. Contractor will not be allowed to take
advantage of any error, omission or discrepancy, as full instructions will be furnished by
Consultant. Contractor shall not be liable for damages resulting from errors, omissions or
discrepancies in the Contract or Job Order Documents unless Contractor recognized such error,
omission or discrepancy and knowingly failed to report it to Consultant.
3.8.2. Supplementary Drawings. When, in the opinion of Consultant, it becomes necessary to
explain the Detailed Scope of Work to be done more fully, or to illustrate the Work further, or to
show any changes which may be required, supplementary drawings, with specifications pertaining
thereto, will be prepared by Consultant. The supplementary drawings shall be binding upon
Contractor with the same force as the Contract or Job Order or Job Order Documents. Where
such supplementary drawings require either less or more than the original quantities of work,
appropriate adjustments shall be made by Supplemental Job Order.
3.8.3. Shop Drawings.
41 I 2019-257-KB
3.8.4.1. Contractor shall submit Shop Drawings as required by the Technical
Specifications. The purpose of the Shop Drawings is to show the suitability, efficiency, technique
of manufacture, installation 'requirements, details of the item and evidence of its compliance or
noncompliance with the Contract or Job Order or Job Order Documents.
3.8.4.2. Within ten (10) calendar days after the Project Initiation Date specified in the
Notice to Proceed, Contractor shall submit to Consultant a complete list of preliminary data on
items for which Shop Drawings are to be submitted and shall identify the critical items. Submission
of such documents is a condition precedent to the issuance of a Notice to Proceed for construction.
Approval of this list by Consultant shall in no way relieve,Contractor from submitting complete Shop
Drawings and providing materials, equipment, etc., fully in accordance with the Contract or Job
Order or Job Order Documents. This procedure is required in order to expedite final approval of
Shop Drawings.
3.8.4.3. After the approval of the list of items required herein, Contractor shall promptly
request Shop Drawings from the various manufacturers, fabricators, and suppliers. Contractor
shall include all shop drawings and other submittals in its certification.
3.8.4.4. Contractor shall thoroughly review and check the Shop Drawings and each and
every copy shall show this approval thereon.
3.8.4.5. If the Shop Drawings show or indicate departures from the Contract or Job
Order or Job Order requirements, Contractor shall make specific mention thereof in its letter of
transmittal. Failure to point out such departures shall not relieve Contractor from its responsibility
to comply with the Contract or Job Order or Job Order Documents.
3.8.4.6. Consultant shall review and approve Shop Drawings within seven (7) calendar
days from the date received, unless said Drawings are rejected by Consultant for material reasons.
Consultant's approval of Shop Drawings will be general and shall not relieve Contractor of
responsibility for the accuracy of such Drawings, nor for the proper fitting and construction of the
work, nor for the furnishing of materials or work required by the Contract or Job Order Documents
and not indicated on the Drawings. No work called for by Shop Drawings shall be performed until
the said Drawings have been approved by Consultant. Approval shall not relieve Contractor from
responsibility for errors or omissions of any sort on the Shop Drawings.
3.8.4.7. No approval will be given to partial submittals of Shop Drawings for items which
interconnect and/or are interdependent where necessary to properly evaluate the design. It is
Contractor's responsibility to assemble the Shop Drawings for all such interconnecting and/or
interdependent items, check them and then make one submittal to Consultant along with its
comments as to compliance, noncompliance, or features requiring special attention.
3.8.4.8. If catalog sheets or prints of manufacturers' standard drawings are submitted
as Shop Drawings, any additional information or changes on such drawings shall be typewritten or
lettered in ink.
42 I 2019-257-KB
3.8.4.9. Contractor shall submit the number of copies required by Consultant.
Resubmissions of Shop Drawings shall be made in the same quantity, until final approval is
obtained.
3.8.4.10. Contractor shall keep one set of Shop Drawings marked with Consultant's
approval at the job site at all times.
3.8.4. Field Layout of the Work and Record Drawings, The entire responsibility for
establishing and maintaining line and grade in the field lies with Contractor.
3.8.5.1. Contractor shall maintain an accurate and precise record of the location and
elevation of all pipe lines, conduits, structures, maintenance access structures, handholes, fittings
and the like and shall prepare record or "as-built" drawings of the same which are sealed by a
Professional Surveyor. Contractor shall deliver these records in good order to Consultant as the
Work is completed. The cost of all such field layout and recording work is included in the prices bid
for the appropriate items. All record drawings shall be delivered to Consultant prior to Substantial
Completion, in accordance with the Contract or Job Order or Job Order Documents.
3.8.5.2. Contractor shall maintain in a safe place at the Project Site one record copy of
all Drawings, Plans, Specifications, addenda, written amendments, Change Orders, Field Orders
and written interpretations and clarifications in, good order and annotated to show all changes
made during construction. These record documents together with all approved samples and a
counterpart of all approved Shop Drawings shall_ be available at all times to Consultant for
reference: Upon Final Completion of the Project and prior to Final Payment, these record
documents, samples and Shop Drawings shall be delivered to the Contract or Job Order or Job
Order Administrator.
3.8.5.3. Prior to, and. as a condition precedent to Final Payment, Contractor shall
submit to City, Contractor's record drawings or as-built drawings acceptable to Consultant.
3.8.5. Art in Public Places ("AIPP") Coordination. Contractor shall coordinate the
implementation of the City's AIPP commissions and installations for the Project, if any, with all such
coordination Work covered within the Contract Job Order Price, provided, however, that the City
shall separately fund the commissioning and installations of all AIPP artworks.
3.8.6. City's Participation. THE CITY HAS NO OBLIGATION TO ASSIST, FACILITATE
AND/OR PERFORM IN ANY WAY THE CONTRACTOR'S OBLIGATIONS UNDER THE
AGREEMENT OR OTHER CONTRACT OR JOB ORDER OR JOB ORDER DOCUMENTS. THE
CITY'S PARTICIPATION, FACILITATION AND/OR ASSISTANCE TO THE CONTRACTOR
SHALL BE AT ITS SOLE DISCRETION AND SHALL NOT, IN ANY WAY, BE CONSTRUED,
INTERPRETED ANDIOR CONSTITUTE AN ASSUMPTION BY THE CITY OF CONTRACTOR'S
OBLIGATIONS, A- WAIVER OF CONTRACTOR'S OBLIGATIONS AND/OR EXCUSE ANY
BREACH BY CONTRACTOR OF ITS OBLIGATIONS UNDER THE CONTRACT OR JOB
ORDER OR JOB ORDER DOCUMENTS. THE PARTICIPATION IN THE PERFORMANCE OF
ANY OF CONTRACTOR'S OBLIGATIONS SHALL NOT PRECLUDE THE CITY FROM
DECLARING CONTRACTOR IN DEFAULT FOR CONTRACTOR'S FAILURE TO PERFORM
SUCH OBLIGATION, NOR SHALL IT LIMIT, IN ANY WAY, THE CITY'S RIGHTS AND
43 I 2019-257-KB .
REMEDIES IN CONNECTION THEREWITH. THE CONTRACTOR EXPRESSLY
ACKNOWLEDGES AND AGREES NOT TO RAISE OR ASSERT AS DEFENSE TO ANY CLAIM,
ACTION, SUIT AND/OR OTHER PROCEEDING OF A SIMILAR NATURE, THE CITY'S
PARTICIPATION, ASSISTANCE AND/OR FACILITATION IN THE PERFORMANCE OF
CONTRACTOR'S OBLIGATIONS. INCLUDING, WITHOUT LIMITATION, ASSISTING WITH
OBTAINING PERMITS OR WITH COORDINATION WITH UTILITIES, OR OTHER MATTERS
RELATED TO THE PROJECT. IN THE EVENT OF ANY CONFLICT BETWEEN THIS SECTION
AND/OR ANY OTHER PROVISION OF THIS AGREEMENT OR OTHER CONTRACT OR JOB
ORDER OR JOB ORDER DOCUMENTS, THIS SECTION SHALL GOVERN.
3.8.7. City's Information. Except for any tests or studies that the City provides as part of the
ITB, any information provided by the City to the Contractor relating to the Project and/or other
conditions affecting the Project Site, is provided only for the convenience of the Contractor and
does not relieve the Contractor of the due diligence necessary to independently verify local
conditions and Site Conditions. The City makes no representation or warranty as to, and assumes
no responsibility whatsoever with respect to, the sufficiency, completeness or accuracy of any
such test, studies or other information and makes no guarantee, either express or implied, that the
conditions indicated in such information or independently found by the Contractor as a result of
any examination, exploration or testing, are representative of those existing throughout the
performance of the Work or the Project Site, and there is no guarantee against unanticipated or
undisclosed conditions.
ARTICLE 4.. CONTRACT JOB ORDER PRICE.
•
4.1. The Job Order Price is specified in the Job Order. The Job Order Price shall be full
compensation for all labor, materials, equipment, costs, and expenses, including overhead and
profit, associated with completion of the Detailed Scope of Work accordance with the requirements
of the Contract or Job Order or Job Order Documents, including all Work reasonably inferable
therefrom.
4.2. No Compensation Prior to Notice to Proceed. Prior to the City's issuance of any Notice
to Proceed, Contractor shall not incur any cost to be reimbursed as part of the Project, except as
the Contract or Job Order or Job Order Administrator may authorize in writing.
4.3. Owner's Contingency. The Owner's Contingency shall be an amount, determined by the
City, which will be available to the City to pay for Project costs which are expressly chargeable to
the City or determined to be the City's responsibility under the Contract or Job Order or Job Order
Documents, including, as it relates to the Contractor, the following increased costs of the Project
incurred by Contractor:
a. Express written changes in the Work made in the discretion of the City after issuance
of a Change Order or Construction Change Directive relating thereto. The decision to make such
changes, and to incur the costs that arise there from, shall be in the sole discretion of the City. No
costs may be charged to the Owner's Contingency under this subsection without express approval
of City.
44. I 2019-257-KB
b. Changes to the Work if ordered by agencies having jurisdiction, provided such Work
directly results from City's issuance of a Notice to Proceed prior to obtaining full permits thereon;
c. In the event of Excusable Delay, reasonable acceleration costs to meet milestones, if
approved by the City at its sole and absolute discretion;
d. Differing site conditions pursuant to the Contract or Job Order or Job Order
Documents;
e. Post-hurricane or storm-related Construction Change Directives (to address matters
that are in addition to, or not covered by, the Contractor's City-approved Hurricane Preparedness
Plan required by the Contract or Job Order or Job Order Documents);
f. Increased Costs of the Work resulting from other actions of the City deemed to be
City's responsibility and/or compensable under the Contract or Job Order or Job Order Documents.
Unless Contractor secures City's written agreement that such costs are City's responsibility,
documentation of responsibility for such costs shall be submitted with the Contractor's Claim.
When Contractor has reason to anticipate that such costs may be incurred, it shall be the
Contractor's responsibility, when feasible, to provide the City with sufficient advance notice, so as
to provide the City with a reasonable opportunity to avoid such costs. Such costs shall be deemed
the City's responsibility if City subsequently agrees in writing to grant the Claim and accept such
responsibility, orif the Claim is granted and responsibility assigned to City pursuant to the dispute
resolution process under the Contract or Job Order Documents and all reviews thereof are
exhausted or waived by City. The Contractor has no right or entitlement whatsoever to the
Owner's Contingency, and use of such funds are subject to the City's prior written approval and
issuance of a Change Order or Construction Change Directive by the City at its sole and absolute
discretion. Any unused City Contingency remaining at the completion of the Project shall accrue
solely to the City.
ARTICLE 5. APPLICATION FOR PAYMENT.
5.1. The City will make one payment for all Job Orders that have a Job Order Completion Time
of 45 days or less, or a Job Order Price of$25,000 or less. For all other Job Orders, the City may
make partial, monthly payments based on a percentage of the work completed.
5.2. Before submitting an Application for Payment(Final or Partial), the Project Manager make
a determination concerning the percentage complete of the Detailed Scope of Work and the dollar
value for which the Contractor's Application for Payment may be submitted.
5.3. Contractor may make Application for Payment for work completed during the Project at
intervals of not more than once a month. Contractor's application shall show a complete breakdown
of the Project components, the percentage completed and the amount due, together with such
supporting evidence as may be required by Consultant. Contractor shall include, but same shall be
limited to, at Consultant's discretion, with each Application for Payment, an updated progress
schedule acceptable to Consultant as required by the Contract or Jab Order Documents and a
45 I 2019-257-KB
release of liens and consent of surety relative to the work which is the subject of the Application.
Following submission of an acceptable updated progress schedule and the other documents
required herein a log with the Application for Payment, City shall make payment to Contractor after
approval by Consultant of an Application for Payment, less retainage as herein provided for and/or
withholding of any other amounts pursuant to the Contract or Job Order or Job Order Documents,
within twenty-five (25)days in accordance with Section 218.735 of the Florida Statutes.
5.4. The City shall withhold from each progress payment made to Contractor retainage in the
amount of ten percent (10%) of each such payment until fifty percent (50%) of the Work has been
completed. The Work shall be considered 50% complete at the point at which the City has
expended 50% of the approved Cost of the Work together with all costs associated with existing
change orders or other additions or modifications to the construction services provided for in the
Contract or Job Order or Job Order Documents.
Thereafter, the Contract or Job Order or Job Order Administrator shall reduce to five percent (5%)
the amount of retainage withheld from each subsequent progress payment made to the Contractor,
until Substantial Completion. Any reduction in retainage shall be in accordance with Section
255.078 of the Florida Statutes, as may be amended, and shall otherwise be at the sole discretion
of the Contract or Job Order or Job Order Administrator, after considering any recommendation of
Consultant with respect thereto. Contractor shall have no entitlement to a release of, or reduction
in, retainage, except as may be required herein or by Florida law. Any interest earned on retainage
shall accrue to the benefit of City. All requests for retainage reduction shall be in writing in a stand-
alone document, separate from monthly applications for payment.
5.5. Notwithstanding any provision hereof to_the contrary, the City may withhold payments to the
Contractor in the following circumstances:
a. correction or re-execution of Work which is defective or has not been performed in
accordance with the Contract or Job Order Documents and which the Contractor has
failed to correct in accordance with the terms of the Contract or Job Order or Job
Order Documents;
•
b. past due payments owed to Subcontractors for which City has not been provided an
appropriate release of lien/claim (whether or not the Work in question is the subject
of any dispute);
c. the City's remedies arising from any failure to perform the Contract or Job Order or
Job Order Documents' requirements or uncured Default of this Contract or Job Order
or Job Order by the Contractor;
d. damage to another contractor or third-party (including, without limitation, the property
of any resident or business in the area surrounding the Project Site) which has not
been remedied or, damage to City property which has not been remedied;
e. liquidated damages;
f. failure of Contractor to provide any and all material documents required by the
Contract or Job Order Documents including, without limitation, the failure to maintain
as-built drawings in a current and acceptable state; and
46 I 2019-257-KB
g. pending or imminent Claims of the City or others including, without limitation, Claims
which are subject to Contractor's indemnity obligation under Article 14 hereof, for
which the Contractor has not posted bonds or other additional security reasonably
satisfactory to the City.
Except as otherwise specifically provided in the Contract or Job Order or Job Order Documents,
in no event shall any interest be due and payable by the City to the Contractor or any other
party on any of the sums retained by the City pursuant to any of the terms or provisions of any
of the Contract or Job Order or Job Order Documents.
5.6. Payment by City for Tests. Except when otherwise specified in the Contract or Job Order
or Job Order Documents, the expense of all tests requested by Consultant shall be borne by City
and performed by a testing(firm chosen by Consultant. For road construction projects the
procedure for making tests required by Consultant will be in conformance with the most recent
edition of the State of Florida, Department of Transportation Standard Specifications for Road and
Bridge Construction. The cost of any required test which Contractor fails shall be paid for by
Contractor.
5.7. Form of Application: Projected Payment Schedule. The Contractor shall make each
Application for Payment on AIA Form G702 or other form approved by the City, which incorporates
the budget and the Schedule of Values. For each line item, the Contractor shall state the approved
cost, the cost to date, and the projected total cost, and retainage held (if any), shall state that the
projected total cost shall not exceed the approved cost, as adjusted by Change Order. Each
Application for Payment shall also state the actual costs incurred by the Contractor for the payment
period covered by such Application for Payment.
ARTICLE 6. PROJECT SCHEDULE AND CONTRACT OR JOB ORDER TIME.
6.1. Time for Completion. Time is of the essence throughout this Contract. This project shall
be substantially completed within the amount of calendar days set forth in the Job Order
Completion Time from the issuance of the Job Order or Notice to Proceed, and completed and
ready for final payment as set forth herein within the amount of calendar days set forth in the Job
Order Completion Time from the date certified by Consultant as the date of Substantial
Completion.
6.2. Project Schedule; Preliminary Matters. The Contractor shall submit with its Job Order
Proposal a construction schedule in a format acceptable to the City. For the majority of work, a
construction in bar chart format will be acceptable. For those Job Orders whose Detailed Scope of
Work is more complex or critical in nature, the City may require the Contractor prepare a
construction utilizing a critical path method (CPM) or computerized CPM using the Primavera P6
software or latest version. The City will make the determination of which format to use with each
Job Order.
If requested by the Project Manager, the Contractor shall submit with each Application for Payment
an update of the Project Schedule with an error report stating no errors (that does not revise the
47 I 2019-257-KB
base line schedule), showing the progress for the month ("Progress Schedule"). CONTRACTOR
SHALL SUBMIT ONE HARD COPY AND ONE ELECTRONIC COPY (including a native version
and a pdf). In addition to the Progress Schedule Contractor shall include a narrative report of the
months' progress, an explanation of any delays and or additions/deletions to activities. City's
acceptance of a Progress Schedule for purposes of City's approval of an Application for Payment
shall not constitute or be construed as City's approval of the Progress Schedule itself, or as
approval of any change to the Project Schedule. Any changes to the Project Schedule, if agreed
to, shall be memorialized in a duly executed Change Order.
CONTRACTOR agrees to attend weekly progress meetings and provide an two (2) week look
ahead schedule for review and discussion and monthly be prepared to discuss any:
1) Proposed changes to the Base Line schedule logic;
2) Explain and provide a narrative for reasons why logic changes should be
made; -
3) Update to individual subcontractor activities; and
4) Integration of changes into the schedule.
The Project Schedule shall be the basis of the Contractor's Work and shall be complied with in all
respects.
6.2.1. After award but prior to the submission of the progress schedule, Consultant,
Contract or Job Order or Job Order Administrator and Contractor shall meet with all utility
owners,and secure from them a schedule of utility relocation, provided, however, that by
facilitating Contractor's efforts to coordinate with such utilities, City is not assuming the
obligation to- coordinate any necessary relocations and Contractor shall be solely
responsible for such coordination.
6.2.2. At a time specified by Consultant but before Contractor starts the work at the
Project Site, a conference attended by Contractor, Consultant and others as deemed
appropriate by Contract or Job Order or Job Order Administrator will be held to discuss the
schedules to discuss procedures for handling Shop Drawings and other submittals and for
processing Applications for Payment, and to establish a working understanding among the
parties as to the Work.
6.3. Recovery Schedule.
6.3.1. If Contractor's Work, or any portion of the Work, becomes more than (30) days
behind schedule, if the Work on any critical path item or activity delineated in the Project Schedule
is delayed for a period which exceeds 5% of the days remaining until a completion deadline for an
item in the Project Schedule, or if the reasonably appears that the Contractor will be unable to
meet the deadlines of the Project Schedule, the City may notify Contractor of same, and in such
case, the Contractor shall submit a proposed recovery plan to regain lost schedule progress and to
achieve any Project milestones, Substantial Completion, and Final Completion in accordance with
the Contract or Job Order Documents ("Recovery Schedule"), after taking into account Excusable
Delays (as hereinafter defined) and permitted extensions of the Project for review and acceptance
48 I 2019-257-KB
within seven (7) days following notification from the City, so as to ensure Contractor makes up lost
time.
6.3.2, City shall notify Contractor within five (5) business days after receipt of each
Recovery Schedule, whether the Recovery Schedule is deemed accepted or rejected. Within five
(5) business days after City's rejection of any Recovery Schedule, Contractor will resubmit a
revised Recovery Schedule incorporating City's comments. If the City accepts Contractor's
Recovery Schedule, Contractor shall, within five (5) business days after City's acceptance,
incorporate and fully include the Recovery Schedule into the Project Schedule and deliver same to
City.
6.3.3. If the Contractor fails to provide an acceptable Recovery Schedule, as determined
by City in its sole discretion, that demonstrates Contractor's ability to timely follow the Project
Schedule, the City may, without prejudice to any other rights and remedies available to the City
hereunder or otherwise, declare an Event of Default or order the Contractor to employ such
extraordinary measures, including acceleration of the Work, and other measures, including
substantially increasing manpower and/or necessary equipment, as may be necessary to bring the
Work into conformity with the Project Schedule.
6.4. Substantial Completion. As a condition of Substantial Completion, all of the following
must occur:
6.4.1. All Work affecting the operability of the Project or safety has been completed in
accordance with the Contract or Job Order or Job Order Documents;
6.4.2. If applicable, all pre-commissioning activities, including alignment, balancing,
lubrication and first-fill, have been completed;
6.4.3. The Work may be operated within manufacturers' recommended limits (with all
installation instructions, operations and maintenance manuals or instructions for equipment
furnished by Contractor, catalogs, product data sheets for all materials furnished by Contractor and
similar information provided), in compliance with Applicable Laws, and without damage to the Work
or to the Project;
6.4.4. Contractor has corrected all defects, deficiencies and/or discrepancies to the
entire Work as identified by the City or the Consultant, and the Consultant confirms such
corrections have been made in writing;
6.4.5. The most recent updated set of "as-built" drawings reflecting the progress of the
Work through Substantial Completion (in native file format, such as autoCAD);
6.4.6. When Contractor believes it has achieved Substantial Completion, Contractor shall
request an inspection by the City and the Consultant, and shall provide the City with evidence
supporting its assessment of Substantial Completion, including any specific documents or
information requested by the City to assist in its evaluation thereof. Contractor shall, prior to said
inspection, develop its preliminary Punch List for inputand comment by the City and the
Consultant. Once the preliminary Punch List is submitted to the City, the City and its
49 I 2019-257-KB
representatives shall then schedule-a walk-through of the Project with Contractor and the
Consultant. Following the walk-through, Contractor shall develop and provide City with the list of
all remaining items of Work to be completed or corrected, and which incorporates items and
comments identified or provided by the City and Consultant comments and is certified for
completeness and accuracy by the Consultant ("Substantial Completion Punch List"), provided,
however, that failure to include any items on such Substantial Completion Punch List does not alter
the responsibility of the Contractor to complete all Work in accordance with the Contract or Job
Order or Job Order Documents; and
6.4.7. Any and all appurtenances, utilities, transportation arteries and any other items
required under the Contract or Job Order Documents and necessary to serve that portion of the
Work are sufficiently completed, a temporary certificate of completion or Certificate of Occupancy,
as applicable, is issued for the Work for which a Certificate of Substantial Completion is being
sought and/or all conditions or requirements of authorities having jurisdiction are complied with, to
permit the City to utilize and occupy that portion for its intended use in accordance with the
Contract or Job Order Documents without material interference from any incomplete or improperly
completed items of Work;
6.4.8. With respect to any Project for which a right-of-way permit is required from the
City's Public Works Department or which includes a final lift of asphalt as part of the Work, in no
event shall Substantial Completion occur prior to the final lift of asphalt and acceptance thereof by
the agencies having jurisdiction (including, without limitation, the City's Public Works Department).
6.5. Certificate of Substantial Completion. Any determination by the Consultant and the
Contractor of Substantial Completion shall not be binding on the City, and the ultimate
determination of Substantial'Completion shall rest with the City and shall be evidenced by the
City's executing and returning to the Contractor its Certificate of Substantial Completion (or Partial
Substantial Completion, as applicable).
6.5.1. When the City, on the basis of an inspection, determines that the Work or designated
portion thereof is substantially complete, and when the Contractor has complied with all other
conditions precedent to Substantial Completion provided for in the other Contract or Job Order or
Job Order Documents, the City will then prepare a Certificate of Substantial Completion which shall
establish the Substantial Completion Date, shall state the responsibilities of Contractor, if any, for
security, maintenance, heat, utilities, damage to the Work, and insurance, and shall fix the time
within which the Contractor shall complete the items listed in the Substantial Completion Punch
List. If the City issues a Certificate of Substantial Completion on the basis of partial completion of
the Project, or upon the basis of a partial or temporary certificate of occupancy or certificate of
completion, as applicable, City may include such additional conditions, as it deems appropriate to
protect its interests pending substantial completion of the entire Project or issuance of a permanent
certificate of occupancy or certificate of completion, as applicable.
6.5.2. The City shall not unreasonably withhold or condition acceptance and execution of a
Certificate of Substantial Completion (or a Notice of Partial Substantial Completion); provided,
however, the Project shall not be deemed Substantially Complete and the City shall not execute a
Certificate of Substantial Completion until all of the criteria for achieving Substantial Completion as
identified in the Contract or Job Order Documents have been satisfied, and (2) in the case of a
50 12019-257-KB
portion of the Project, the conditions set forth this Article 6 relating to Partial Substantial
Completion shall have been satisfied.
6.6. Partial Substantial Completion. Partial Substantial Completion of the Work shall occur
when the City determines that a portion of the Work, as defined in the Contract or Job Order
Documents and/or otherwise by logical boundaries, is Substantially Complete in accordance with
the Contract or Job Order or Job Order Documents. The City may (but shall not be obligated to)
agree that a portion or component of the Work, acceptable to the City in its sole discretion, may be
certified as Substantially Complete provided that:
6.6.1. The requirements provided in this Article 6 for issuance of a Certificate of Substantial
Completion are complied with for the portion of the Work for which a Notice of Partial Substantial
Completion is being sought;
6.6.2. Such portion and any and all appurtenances, utilities, transportation arteries and any other
items required under the Contract or Job Order Documents and necessary to serve that portion of
the Work are sufficiently completed, a temporary certificate of completion or Certificate of
Occupancy, as applicable, is issued for the portion of the Work for which a Certificate of Partial
Substantial Completion is being sought and/or all conditions or requirements of authorities having
jurisdiction are complied with, to permit the City to utilize and occupy that portion for its intended
use in accordance with the Contract or Job Order Documents without material interference from
any incomplete or improperly completed items of Work;
6.6.3. The City is fully able to use and occupy the portion of the Work for the purposes intended
and the Contractor separates the portion of the Work which is Substantially Complete from non-
complete areas of the Project in order to prevent noise, dust and other construction disturbances
which would materially interfere with the use of such portion for its intended use in accordance with
the Contract or Job Order Documents and to assure the safety of those entering, exiting and
occupying the Substantially Completed portion of the Work;
6.6.4. Partial Substantial Completion shall not constitute Final Completion of the Work or
Substantial Completion of the Project, nor shall it relieve the Contractor of any responsibility for the
correction of Work (whether or not included in portion of Work Substantially Complete) or for the
performance of Work not complete at the time of Partial Substantial Completion.
6.7. Liquidated Damages.
6.7.1. At the sole discretion of the City, liquidated damages will be assessed, if at all, on a Job
Order-by-Job-Order basis. Upon failure of Contractor to achieve Substantial Completion within the
time period specified in the Job Order for Substantial Completion, as such date may be extended
pursuant to the terms of the Contract or Job Order or Job Order Documents, Contractor shall pay
to City the sum specified in table below titled "Schedule Liquidated Damages" for each calendar
day after the time specified, plus any approved time extensions, for Substantial Completion. Partial
Substantial Completion shall not relieve Contractor of any responsibility for Liquidated Damages for
failure to timely achieve Substantial Completion.
51 I 2019-257-KB
6.7.2. After Substantial Completion is achieved, should Contractor fail to complete the remaining
Work within the time specified in the Job Order for Final Completion, plus approved time
extensions thereof, Contractor shall pay to City the sum specified in table below titled "Schedule
Liquidated Damages" for each calendar day after the time specified for Final Completion, plus any
approved extensions.
6.7.3. Schedule for.Liquidated Damages Table
Job Order Price Liquidated Damages
$0 to$25,000.00 $100/Day
$25,000.01 to $100,000.00 $250/Day
Over$100,000.00 $500/Day
6.7.4. Contractor agrees that the Liquidated Damages set forth herein are not penalties and have
been set based on an evaluation by City of damages to City and the public caused by untimely
performance. Such damages may include loss of revenues to the City, and additional costs of
administering this Agreement, including Project staff, legal, accounting, consultants and overhead
and other administrative costs. Contractor acknowledges that the amounts established for
Liquidated Damages are fair and commercially reasonable. Contractor and City have agreed to
the Liquidated Damages in order to fix Contractor's costs and to avoid later disputes over which
items are properly chargeable to Contractor as a consequence of Contractor's delays.
The above-stated schedule for liquidated damages shall apply separately to each portion of the
Project for which a time for completion is given. City is authorized to deduct liquidated damages
from monies due to Contractor for the Work under this Contract or Job Order or Job Order or as
much thereof as City may, in its sole discretion, deem just and reasonable. Liquidated Damages
shall apply, whether or not the City terminates Contractor for cause and whether or not Surety
completes the Project after a Default by Contractor.
Liquidated Damages shall apply solely to claims arising from delay in meeting any milestone for
which the right to assess Liquidated Damages is specified, including, without limitation, Substantial
Completion, and Final Completion, and shall be the City's sole remedy for delay, and are not
intended to, and do not, liquidate Contractor's liability under any other provision of the Contractor
Documents for other events not specifically referenced in this Article 6. Liquidated Damages shall
not liquidate Contractor's liability under the indemnification provisions of this Agreement.
Contractor, in addition to reimbursing City for Liquidated Damages or other damages for untimely
performance as provided herein, shall reimburse City for all costs incurred by City to repair,
restore, or complete the Work, as may be provided by the Contract or Job Order or Job Order
Documents, including, without limitation, any additional design fees that may be due to the
Consultant related thereto. All such costs shall be deducted from the monies otherwise due
2
52 I 2019-257-KB
Contractor for performance of Work under this Agreement by means of unilateral credit or
deductive Change Orders issued by City.
In the event a court of competent jurisdiction determines that any Liquidated Damages amount
herein is unenforceable notwithstanding Contractor's agreement herein that such amounts are fair
and reasonable, Contractor shall not be relieved of its obligations to the City for the actual
damages resulting from the failure to timely achieve Substantial Completion or Final Completion in
accordance with the requirements of the Contract or Job Order or Job Order Documents. Without
limiting the foregoing, City and Contractor covenant not to bring any action in a court of competent
jurisdiction that would ask the court to rule that the Liquidated Damages amounts are not fair and
reasonable.
6.8. Beneficial Occupancy. Beneficial Occupancy shall occur when the City determines that a
portion of the Work may be occupied prior to Substantial Completion. City may take Beneficial
Occupancy in accordance with the provisions of the Contract or Job Order or Job Order
Documents.
6.8.1. Prior to the anticipated date of Beneficial Occupancy, Contractor shall separate the portion
of the Work to be occupied from non-complete areas of the Project in order to prevent noise, dust
and other construction disturbances which would materially interfere with the use of such portion
for its intended use in accordance with the Contract or Job Order Documents and to assure the
safety of those entering, exiting and occupying the completed portion to be occupied.
- Beneficial Occupancy shall not constitute Substantial Completion or Final Completion of
the'Work, nor shall it relieve the Contractor of any responsibility for the correction of Work(whether
or not included in the portion of Work to be occupied) or for the performance of Work not complete
at the time of Beneficial Occupancy.
6.8.3. After Beneficial Occupancy and as conditions of Substantial Completion, the Contractor
shall deliver to the City complete as-built drawings, all approved Shop Drawings, maintenance
manuals, pamphlets, charts, parts lists and specified spare parts, operating instructions and other
necessary documents required for all installed materials, equipment, or machinery, all applicable
warranties and guarantees, and the appropriate certificate of occupancy or certificate of completion
that are related to the portion of the Work being occupied.
6.8.4. Contractor's insurance on the unoccupied or unused portion or portions of the Project Site
shall not be canceled or lapsed on account of such Beneficial Occupancy.
6.8.5. Contractor shall be responsible to maintain all utility services to areas occupied by the City
until Final Completion.
6.9. Final Completion. Final Completion of the Project shall be deemed to have occurred if all
the following have occurred:
6.9.1. Substantial Completion of the entire Project has occurred;
53 I 2019-257-KB
6.9.2. The Work can be used and operated in accordance with Applicable Laws bearing on the
performance of the Work and applicable permits;
6.9.3. All spare parts, special tools and attic stock purchased by Contractor as part of Vendor
supplies shall have been delivered to City and clear of all Liens;
6.9.4. All items on the Substantial Completion Punch List shall have been completed by
Contractor to City's satisfaction and all final inspections have been performed;
6.9.5. Contractor has satisfied the additional conditions prescribed by the City in conjunction with
a Certificate of Substantial Completion issued on the basis of partial completion of the Project, or a
partial or temporary Certificate of Occupancy or Certificate of Completion, as applicable;
6.9.6. Contractor has delivered evidence to the City that all permits, that are Contractor's
responsibilities as specified under the Contract or Job Order Documents have been satisfied and
closed, and that a Certificate of Completion or Certificate of Occupancy (as applicable) has been
issued by the authority having jurisdiction, and the Project or designated portion thereof is
sufficiently complete in accordance with the Contract or Job Order Documents and can be used for
its intended purposefor uninterrupted operation, including, without limitation, acceptance of
completed as-builts, if required by the agency having jurisdiction.
6.9.7. Contractor shall have provided to City final releases and complete and unconditional
waivers of liens for all Work performed by Contractor and each Subcontractor or Suppliers, and a
Consent of Surety to Final Payment;
6.9.8. Contractor shall have delivered to the City a certification identifying all outstanding Claims ,
(exclusive of any Liens or other such encumbrances which must have been discharged) of
• Contractor (and of its Subcontractors, Suppliers and any other party against Contractor) with
written documentation reasonably sufficient to support and/or substantiate such Claims;
6.9.9. Contractor shall have delivered to the City a written assignment of all warranties or
guaranties which Contractor received from Subcontractors or Suppliers to the extent Contractor is
obligated to do so;
6.9.10. Contractor shall have delivered to City a complete set of as-built documents and Project
Records prepared in accordance with the Contract or Job Order or Job Order Documents;
6.9.11. Contractor has delivered to City all other submittals required by the Contract or Job Order
or Job Order Documents, including all installation instructions, operations and maintenance
manuals or instructions for equipment furnished by Contractor, catalogs, product data sheets for all
materials furnished by Contractor and similar information;
6.9.12. All rubbish and debris have been removed from the Project Site; and
6.9.13. All Construction aids, equipment and materials have been removed from the Project Site.
54 I 2019-257-KB
•
6,9.14. Contractor has delivered to the City all executed warranties and guarantees required by
the Contract or Job Order or Job Order Documents, all of which shall be in the name of the City
and run to the benefit of the City;
6.9.15. If applicable, certificates of insurance indicating that any insurance required of the
Contractor or Subcontractors by the Contract or Job Order Documents shall remain in full force and
effect for the required period of time;
6.9.16. Any other documentation establishing payment or satisfaction of obligations, including
receipts, releases and final waivers of lien from the Contractor and all Subcontractors, to the extent
and in such form as may be reasonably required by the City;
6.9.17. Final Completion is a condition precedent to City's final payment to Contractor and
issuance of the Final Certificate for Payment. Final payment shall be made only after the City
Manager or his designee has reviewed a written evaluation of the performance of Contractor
prepared by the Contract or Job Order or Job Order Administrator, and approved the final payment.
6.9.18. Waiver of Claims. The release by the City and acceptance of the final payment by
Contractor shall operate as and shall be a release to the City from all present and future
Claims or liabilities, of whatever kind or nature, arising under, relating to or in connection with
this Contract or Job Order or Job Order for anything done or furnished or relating to the Work
or the Project, or from any act or omission of the City relating to or connected with the Contract
or Job Order or Job Order Documents, the Work or the Project, except those Claims or
liabilities, if any, for which the Contractor has provided the City with written notice pursuant to
and in strict.compliance with the "Claims" and notice requirements set forth in the Contract or
Job Order or Job Order Documents, and containing a detailed reservation of rights that
identifies the precise nature of the dispute, all facts in support of Contractor's Claim, the particular
scope of Work giving rise to the Claim, and the maximum amount and/or time sought in connection
with the Claim.
ARTICLE 7. INSPECTION OF WORK; CORRECTION OF
NON-CONFORMING OR DEFECTIVE WORK.
7.1. Consultant, City (and its authorized designees), and representatives of any regulatory
agencies having jurisdiction over the Project, shall at all times have access to the Work and the
Project Site, and Contractor shall provide proper facilities for such access and for inspecting,
measuring and testing. Whenever requested, Contractor shall give the City and any inspectors or
representatives appointed by the City free access to its Work during normal working hours either at
the Project Site or its shops, factories, or places of business of Contractor and its Subcontractors
and suppliers for properly inspecting materials, equipment and Work, and shall furnish them with
full information as to the progress of the Work in its various parts.
7.2. Should the Contract or Job Order or Job Order Documents, Consultant's instructions, any
laws, ordinances, or any public authority require any of the Work to be specially tested or
approved, Contractor shall give Consultant timely notice of readiness of the Work for testing. If the
55 I 2019-257-KB
testing or approval is to be made by an authority other than City, timely notice shall be given of the
date fixed for such testing. Testing shall be made promptly, and, where practicable, at the source
of supply. If any of the Work should be covered up without approval or consent of Consultant, it
must, if required by Consultant, be uncovered for examination and properly restored at Contractor's
expense.
7.3. Reexamination of any of the Work may be ordered by Consultant with prior written
approval by the Contract or Job Order or Job Order Administrator, and if so ordered, the Work
must be uncovered by Contractor. If such Work is found to be in accordance with the Contract or
Job Order or Job Order Documents, City shall pay the cost of reexamination and replacement by
means of a Change Order. If such Work is not in accordance with the Contractor Job Order or Job
Order Documents, Contractor shall pay such cost.
7.4. Inspectors shall have no authority to permit deviations from, or to relax any of the
provisions of, the Contract or Job Order Documents or to delay the Contract or Job Order or Job
Order by failure to inspect the materials and work with reasonable promptness without the written
permission or instruction of Consultant.
7.5. The payment of any compensation, whatever may be its character or form, or the giving of
any gratuity or the granting of any favor by Contractor to any inspector, directly or indirectly, is
strictly prohibited, and any such act on the part of Contractor will constitute a breach of this
Contract.
7.6. The Contractor shall coordinate all technical inspection and testing provided by
professionals designated by the City, the Consultant, permitting authorities, and others. The
Contractor shall also schedule the services of independent testing laboratories and provide the
necessary testing of materials to ensure conformance to the Contract or Job Order Documents and
provide a copy of all inspection and testing reports to the City on the day of inspection or test. The
Contractor shall provide reasonable prior notice to appropriate inspectors before the Work is
covered up, but in no event less than 24 hours before the Work is covered up. All costs for
uncovering Work not inspected and any reconstruction due to lack of reasonable prior notice shall
be borne by Contractor at its sole cost and expense. Any time billed by inspectors for inspection
where the Work is not ready to be inspected shall be at Contractor's sole cost and expense. If any
members of the Project team are to observe said inspections, tests or approvals required by the
Contract or Job Order or Job Order Documents, they shall be notified in writing by the Contractor of
the dates and times of the inspections, tests or other approvals. The Contractor shall schedule,
direct and/or review the services of or the reports and/or findings of surveyors, environmental
consultants and testing and inspection agents engaged by the City. All Materials and Equipment
furnished by Contractor and Work performed by Contractor shall at all times be subject to
inspection and testing by City or inspectors or representatives appointed by City. If any of the
Work should be covered up without approval or con`sent of City's Project Coordinator, or without
necessary test and inspection, Contractor shall, if required by City's Project Coordinator or by
public authorities, uncover such Work for examination and testing, and shall re-cover same at
Contractor's expense.
7.7. Defective or Non-Conforming Work.
56 I 2019-257-KB
7.7.1. Consultant and City shall have the authority to reject or disapprove work which either
Consultant or City find to be defective. If required by Consultant or City, Contractor shall promptly
either correct all defective work or remove such defective work and replace it with non-defective
work. Contractor shall bear all direct, indirect and consequential costs of such removal or
corrections including cost of testing laboratories and personnel.
7.7.2. Should Contractor fail or refuse to remove or correct any defective work or to make any
necessary repairs in accordance with the requirements of the Contract or Job Order Documents
within the time indicated in writing by Consultant, City shall have the authority to cause the
defective work to be removed or corrected, or make such repairs as may be necessary at
Contractor's expense. Any expense incurred by City in making such removals, corrections or
repairs, shall be paid for out of any monies due or which may become due to Contractor , or may
be charged against the Performance Bond. In the event of failure of Contractor to make all
necessary repairs promptly and fully, City may declare Contractor in default.
7.7.3. If,within one (1)year after the date of Substantial Completion or such longer period of time
as may be prescribed by the terms of any applicable special warranty required by the Contract or
Job Order or Job Order Documents, or by any specific provision of the Contract or Job Order or
Job Order Documents, any of the Work is found to be defective or not in accordance with the
Contract or Job Order or Job Order Documents, Contractor , after receipt of written notice from
City, shall promptly correct such defective or nonconforming Work within the time specified by City
without cost to City, to do so. Nothing contained herein shall be construed to establish a period of
limitation with respect to any other obligation which Contractor might have under the Contract or
Job.Order Documents including but not limited to, Contractor's warranty obligations hereof and any
claim regarding latent defects.
7.7.4. Failure to reject any defective work or material shall not in any way prevent later rejection
when such defect is discovered, or obligate City to final acceptance.
7.8: Cleaning Up; City's Right to Clean Up. Contractor shall at all times keep the premises
free from accumulation of waste materials or rubbish caused by its operations. At the completion
of the Project, Contractor shall remove all its waste materials and rubbish from and about the
Project as well as its tools, construction equipment, machinery and surplus materials. If Contractor
fails to clean up during the prosecution of the Work or at the completion of the Work, City may do
so and the cost thereof shall be charged to Contractor. If a dispute arises between Contractor and
separate contractors as to their responsibility for cleaning up, City may clean up and charge the
cost thereof to the contractors responsible therefore as Consultant shall determine to be just.
ARTICLE 8. SAFETY AND PROTECTION OF PROPERTY.
8.1. Contractor shall be solely responsible for initiating, maintaining and supervising all safety
precautions and programs in connection with the Project. Contractor shall take all necessary
precautions for the safety of, and shall provide the necessary protection to prevent damage, injury
or loss to:
8.1.1. All employees on the work site and other persons who may be affected thereby;
57 1 2019-257-KB
•
8.1.2. All the work and all materials or equipment to be incorporated therein, whether in storage
on or off the Project Site;and
8.1.3. Other property at the Project Site or adjacent thereto, including trees, shrubs, lawns,
walks, pavements, roadways, structures and utilities not designated for removal, relocation or
replacement in the course of construction.
8.2. Contractor shall comply with all Applicable Laws for the safety of persons or property or to
protect them from damage, injury or loss; and shall erect and maintain all necessary safeguards for
such safety and protection. City and Contractor shall notify owners of adjacent property and
utilities when prosecution of the work may affect them. Contractor shall be responsible for and
shall remedy all damage, injury or loss to any property, caused directly or indirectly, in whole or in
part, by Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or
anyone for whose acts any of them may be liable. Contractor's duties and responsibilities for the
safety and protection of the work shall continue until such time as all the Work is completed and
Consultant;has issued a notice to City and Contractor that the Work is acceptable except as
otherwise provided in the Contract or Job Order or Job Order Documents.
8.3. Contractor shall designate a responsible member of its organization at the Work site
whose duty shall be the prevention of accidents. This person shall be Contractor's Construction
Superintendent, unless otherwise designated in writing by Contractor to City.
8.4. Contractor's Responsibility for Damages and Accidents.
8.4.1. Contractor shall accept full responsibility for the Work against all loss or damage of
whatsoever nature sustained until final acceptance by City, and-shall promptly repair any damage
done from any cause whatsoever.
8.4.2. Contractor shall be responsible for all materials, equipment and supplies pertaining to the
Project. In the event any such materials, equipment and supplies are lost, stolen, damaged or
destroyed prior to final acceptance by City, Contractor shall replace same without cost to City.
8.5. Occupational Health and Safety.
8.5.1. In compliance with Chapter 442, Florida Statutes, any toxic substance listed in Section
38F-41.03 of the Florida Administrative Code delivered as a result of this bid must-be accompanied
by a Material Safety Data Sheet (MSDS) which may be obtained from the manufacturer. The
MSDS must include the following information:
a. The chemical name and the common name of the toxic substance.
b. The hazards or other risks in the use of the toxic substance, including:
i. The potential for fire, explosion, corrosion, and reaction;
ii. The known acute and chronic health effects of risks from exposure, including the
medical conditions which are generally recognized as being aggravated by
exposure to the toxic substance; and
58 I 2019-257-KB
iii. The primary routes of entry and symptoms of overexposure.
c. The proper precautions, handling practices, necessary personal protective equipment,
and other safety precautions in the use of or exposure to the toxic substances,
including appropriate emergency treatment in case of overexposure.
d. The emergency procedure for spills, fire, disposal, and first aid.
e. A description in lay terms of the known specific potential health risks posed by the
toxic substance intended to alert any person reading this information.
The year and month, if available, that the information was compiled and the name, address, and
emergency telephone number of the manufacturer responsible for preparing the information.
8.6. Hurricane and Tropical Storm Precautions.
8.6.1. during such periods of time as are designated by the United States Weather Bureau as
being a hurricane warning or tropical storm alert, the Contractor, at no cost to the City, shall take all
precautions necessary to secure the Project Site in response to all threatened storm events,
regardless of whether the City or Consultant has given notice of same.
8.6.2. Contractor's Hurricane Preparedness Plan shall, at a minimum, include the following: (1)
monitoring of the real time weather radar and insuring reasonable precautions are taken prior to
and during inclement weather conditions, from a severe thunderstorms to a category 5 hurricane,
to prevent accidents and to minimize property damage; (2) preparing an emergency phone list -
showing home phone numbers of all project personnel and subcontractor's supervisors, including
all land lines and cell phones, to be used for emergency purposes only; (3) ensuring the project
jobsite's equipment and buildings are protected, identifying vulnerable work in progress and
determining how to best protect it from damage, and capping all incomplete piping to prevent sand
filtration; (4)cleaning the entire project, inside and out, removing trash from the job site, clearing all
materials that can become airborne, verifying that all erosion and sediment control devices are in
place and meet adequate standards, and removing screening on fences and signs; (5) arranging
for the pickup of all dumpsters and portable toilets and secure all materials and equipment,
anchoring or restraining everything that could blow away, and removing all non-essential
barricades; and (6) the documenting of conditions of the project and the surrounding area before
and after the incident(photographs and video).
8.6.3. Contractor shall be solely responsible for all costs of all precautions and Work covered by
Contractor's Hurricane Preparedness Plan. Compliance with Contractor's Hurricane Preparedness
Plan shall not constitute additional Work.
8.6.4. Any additional Work not covered in the Hurricane Preparedness Plan relating to hurricane
warning or tropical storm alert at the Project Site will be addressed by a Change Order in
accordance with the Contract or Job Order or Job Order Documents.
59 I 2019-257-KB
8.6.5. Suspension of the Work caused by a threatened or actual storm event, regardless of
whether the City has directed such suspension, will entitle the Contractor to additional Contract or
Job Order Time as noncompensable, excusable delay, and shall not give rise to a claim for
compensable delay.
" 8.6.6. Within ten (10) calendar days after the Project Initiation Date specified in the Notice to
Proceed, Contractor shall submit to the City a Hurricane Preparedness Plan.
8.7. Location and Damage to Existing Facilities, Equipment or Utilities.
8.7.1. As far as possible, all existing utility lines in the Project area have been shown on the
plans. However, City does not guarantee that all lines are shown, or that, the ones indicated are in
their true location. As part of the Contract Job Order Price, it shall be the Contractor's
responsibility to identify and locate all underground and overhead utility lines or equipment
affecting or affected by the Project,whether or not shown on the plans.
8.7.2. The Contractor shall notify each utility company involved at least ten (10) days prior to the
start of construction to arrange for positive underground location, relocation or support of its utility
where that utility may be in conflict with or endangered by the proposed construction. Relocation of
water mains or other utilities for the convenience of the Contractor shall be paid by the Contractor.
All charges by utility companies for temporary support of its utilities shall be paid for by the
Contractor (for utilities indicated in the Contract or Job Order or Job Order Documents). All costs
of permanent utility relocation to avoid conflict shall be the responsibility of the utility company
involved, if indicated in the Contract or Job Order or Job Order Documents. No additional payment
will be made to the Contractor for utility relocations indicated in the Contract or Job Order or Job
Order Documents, whether or not said relocation is necessary to avoid conflict with other lines.
8.7.3. If Contractor, as part of its responsibility to identify all utility lines, identifies utility conflicts
which materially differ from those indicated in the Contract or Job Order or Job Order Documents,
such utility conflicts (for items not indicated in the Contract or Job Order or Job Order Documents)
shall be addressed pursuant to the requirements of"Differing Site Conditions"as set forth in Article
10 shall apply.
8.7.4. The Contractor shall reasonably schedule the Work, and the phasing thereof, in such a
manner so that the overall Project Schedule is not impacted and completion of the Work is not
delayed by the utility providers relocating or supporting their utilities. The Contractor shall
coordinate its activities with any and all public and private utility providers occupying the right-of-
way. No compensation will be paid to the Contractor for any loss of time or delay, except as
provided in Article 10 of the Contract or Job Order or Job Order Documents.
8.7.5. All overhead, surface or underground structures and utilities encountered are to be
carefully protected from injury or displacement. All damage to such structures is to be completely
repaired within a reasonable time; needless delay will not be tolerated. The City reserves the right
to remedy such damage by ordering outside parties to make such repairs atrthe expense of the
Contractor. All such repairs made by the Contractor are to be made to the satisfaction of the utility
owner. All damaged utilities must be replaced or fully repaired. All repairs are to be inspected by
the utility owner prior to backfilling.
60 12019-257-KB
8.8. Risk of Loss. The risk of loss to any of the Work and to any goods, materials and
equipment provided or to be provided under the Contract or Job Order or Job Order
Documents, shall remain with the Contractor until Substantial Completion. Should any of the
Work, or any such goods, materials and equipment, be destroyed, mutilated, defaced or
otherwise damaged prior to the time the risk of loss has shifted to the City, the Contractor shall
repair or replace the same at its sole cost. The Performance Bond and Payment Bond or other
security or insurance protection required by the Contract or Job Order Documents or otherwise
provided by the City or the Contractor shall in no way limit the responsibility of the Contractor
under this Section.
ARTICLE 9. BONDS, INSURANCE AND INDEMNITY,
9.1. Performance Bond and Payment Bond: The Contractor shall, prior to the issuance of a Job
Order Notice to Proceed, furnish and deliver to the City a payment bond and a performance bond,
in a form to be provided by the City, issued by sureties licensed and authorized to do business in
the State of Florida, covering the faithful performance and completion of the Project pursuant to the
Contract or Job Order or Job Order Documents, including the performance and completion of those
services provided by Subcontractors of any tier and covering the payment of all obligations arising
hereunder including but not limited to, the payment for all,materials used in the performance of the
Project in accordance with the Contract or Job Order or Job Order Documents, and for all labor
and services performed under the Contract or Job Order Documents (including materials, labor
and/or services provided by Subconsultants and Subcontractors of any tier), whether by
Subcontractors or otherwise. Each of the aforesaid bonds (collectively herein referred to as the
"Performance Bond and Payment Bond") shall have a penal amount equal to the Job Order Price,
unless otherwise approved by the City and to the extent permitted by law. The Contractor shall be
compensated for the cost of the bonds up to 2% of the Job Order Price through the
reimbursable work task in the Construction Task Catalog®.
The Performance Bond and Payment Bond and the sureties issuing such bonds shall meet all the
requirements set forth in the Contract or Job Order Documents and the Performance Bond and
Payment Bond shall each be in the form attached hereto or shall otherwise be acceptable to the
City in its reasonable discretion. If any of the sureties on the Performance Bond and Payment Bond
at any time fails to meet said requirements, or is deemed to be insufficient securityfor the penalty
of said bond, then the City may, on giving thirty (30) days' notice thereof in writing, require the
Contractor to furnish a new and/or additional bond(s) in the above amounts with such sureties
thereon being licensed and authorized to do business in the State of Florida and as shall be •
satisfactory to the City. The cost of the bonds is considered to be part of the Contractor's
Adjustment Factors.
Pursuant to the requirements of Section 255.05(1)(a), Florida Statutes, as may be amended from
time to time, Contractor shall ensure that the bond(s) referenced above shall be recorded in the
public records of Miami-Dade County and provide City with evidence of such recording.
9.2. Alternate Form of Security: In lieu of a Performance Bond and a Payment Bond,
Contractor may furnish alternate forms of security which may be in the form of certified check or •
cashier's check, which shall be in accordance with Section 255.05, Florida Statutes. Such alternate
61 I 2019-257-KB
forms of security shall be subject to the prior approval of City and for same purpose and shall be
subject to the same conditions as those applicable above and shall be held by City for one year
after completion and acceptance of the Work.
9.3. Qualification of Surety: Bid Bonds, Performance Bonds and Payment Bonds over Five
Hundred Thousand Dollars($500,000.00):
9.3.1. Each bond must be executed by a surety company of recognized standing, authorized to
do business in the State of Florida as surety, having a resident agent in the State of Florida and
having been in business with a record of successful continuous operation for at least five (5)years.
9.3.2. The surety company shall hold a current certificate of authority as acceptable surety on
federal bonds in accordance with United States Department of Treasury Circular 570, Current
Revisions. If the amount of the Bond exceeds the underwriting limitation set forth in the circular, in
order to qualify, the net retention of the surety company shall not exceed the underwriting limitation
in the circular, and the excess risks must be protected by coinsurance, reinsurance, or other
methods in accordance with Treasury Circular 297, revised September 1, 1978 (31 DFR Section
223.10, Section 223.111). Further, the surety company shall provide City with evidence
satisfactory to City, that such excess risk has been protected in an acceptable manner.
9.3.3. The City will accept a surety bond from a company with a rating of B+ or better for bonds
up to $2 million, provided, however, that if any surety company appears on the watch list that is
published quarterly by Intercom of the Office of the Florida Insurance Commissioner, the City shall
review and either accept or reject the surety company based on the financial information available
to the City. A surety company that is rejected by the City may be substituted by the Bidder or
proposer with a surety company acceptable to the City, only if the bid amount does not increase.
The following sets forth, in general, the acceptable parameters for bonds:
Policy- Financial
holder's Size
Amount of Bond Ratings Category
500,001 to 1,000,000 B+ Class I
1,000,001 to 2,000,000 B+ Class II
2,000,001 to 5,000,000 A Class III
5,000,001 to 10,000,000 A Class IV
10,000,001 to 25,000,000 A Class V
25,000,001 to,50,000,00 A Class VI
50,000,001 or more A Class VII
9.3.4. For projects of$500,000.00 or less, City may accept a Bid Bond, Performance Bond and
Payment Bond from a surety company which has twice the minimum surplus and capital required
by the Florida Insurance Code at the time the Job Order is issued, if the surety company is
otherwise in compliance with the provisions of the Florida Insurance Code, and if the surety
company holds a currently valid certificate of authority issued by the United States Department of
the Treasury under Section 9304 to 9308 of Title 31 of the United States Code, as may be
amended from time to time. The Certificate and Affidavit so certifying should be submitted with the
Bid Bond and also with the Performance Bond and Payment Bond.
62 I 2019-257-KB
9.3.5. Unless more stringent surety requirements of any grantor agency are set forth within the
Supplemental Conditions, the provisions of this Article shall apply.
9.4. Insurance Requirements. The Bidder shall furnish to the Procurement Department, City
of Miami Beach, 1755 Meridian Avenue, 3rd Floor, Miami, Florida 33139, Certificate(s) of Insurance
which indicate that insurance coverage has been obtained which meets the requirements set forth
in the Invitation to Bid Summary(and/or exhibits thereto).
9.4.1. Additional Insured Status. The City of Miami Beach must be covered as an additional
insured with respect to liability arising out of work or operations performed by or on behalf of the
Consultant.
9.4.2. Waiver of Subrogation. Contractor hereby grants to City of Miami Beach a waiver of
any right to subrogation which any insurer of the Contractor may acquire against the City of
Miami Beach by virtue of the payment of any loss under such insurance. Contractor agrees to
obtain any endorsement that may be necessary to affect this waiver of subrogation, but this
provision applies regardless of whether or not the City of Miami Beach has received a waiver of
subrogation endorsement from the insurer.
9.4.3. Other Insurance Provisions.
•
a. For any claims related to this project, the Contractor's coverage shall be primary
insurance as respects the City of Miami Beach, its officials, officers, employees, and
volunteers. Any insurance or self-insurance maintained by the City of Miami Beach
shall be excess of the Contractor's insurance and shall not contribute with it.
b. Each policy required by this clause shall provide that coverage shall not be
canceled, except with notice to the City of Miami Beach.
c. If any excavation work is included in the Contract, it is understood and agreed that
Contractor's Liability policy shall not contain exclusion for XCU (Explosion, Collapse
and Underground) coverage.
If any coverage required is written on a claims-made form:
a. The retroactive date must be shown, and must be before the date of the Contract or
Job Order or Job Order or the beginning of Contract or Job Order or Job Order work.
b. Insurance must be maintained and evidence of insurance must be provided for at
least five (5) years after completion of the Contract or Job Order or Job Order of
work.
c. If coverage is canceled or non-renewed, and not replaced with another claims-made
policy form with a retroactive date prior to the Contract or Job Order or Job Order
effective date, the Contractor must purchase extended period coverage for a
minimum of five (5) years after completion of the Contract or Job Order or Job Order
work.
63 I 2019-257-KB
d. A copy of the claims reporting requirements must be submitted to the City of Miami
Beach Risk Management(or its designee)for review.
e. If the services involved lead-based paint or asbestos identification/ remediation, the
Contractors Pollution Liability shall not contain lead-based paint or asbestos
exclusions. If the services involve mold identification/remediation, the Contractors
Pollution Liability shall not contain a mold exclusion and the definition of "Pollution"
shall include microbial matter including mold.
9.4.4. Acceptability of Insurers. Insurance is to be placed with insurers with a current A.M.
Best's rating of no less than A:VII, unless otherwise acceptable to the City of Miami Beach Risk
Management Office.
'9.4.5. Verification of Coverage. Contractor shall provide the required insurance certificates,
endorsements or applicable policy language effecting coverage required by this Article. All
certificates of insurance and endorsements are to be received prior to any work commencing.
However, failure to obtain the required coverage prior to the work beginning shall not waive the
Contractor's obligation to provide them. The City of Miami Beach reserves the right to require
complete, certified copies of all required insurance policies, including endorsements required by
these specifications, at any time.
9.4.6. Special Risks or Circumstances. The City of Miami Beach reserves the right to modify
these requirements, including limits, based on the nature of the risk, prior experience, insurer,
coverage, or other special circumstances.
Certificate Holder:
CITY OF MIAMI BEACH
c/o PROCUREMENT DEPARTMENT
1755 MERIDIAN AVENUE, 3RD FLOOR
MIAMI BEACH, FL 33139
Compliance with the foregoing requirements shall not relieve the vendor of his liability and
obligation under this section or under any other provision of the Contract or Job Order or Job
Order Documents.
9.5. Indemnification.
9.5.1. In consideration of the sum of Twenty-Five Dollars ($25.00) and other good and valuable
consideration, the sufficiency of which the Contractor hereby acknowledges, to the fullest extent
permitted by law, Contractor shall defend, indemnify and save harmless City, and their respective
officers and employees, from liabilities, damages, lossesand costs including, but not limited to,
reasonable attorney's fees, to the extent caused by the negligence, recklessness, or intentional
wrongful misconduct of Contractor and persons employed or utilized by Contractor in the
performance of this Contract.
9.5.2. Sums otherwise due to Contractor under this Contract or Job Order or Job Order may be
retained by City until all of City's Claims for indemnification under this Contract or Job Order or Job
64 I 2019-257-KB
Order have been settled or otherwise resolved. Any amount withheld pursuant to this Article shall
not be subject to payment of interest by City.
9.5.3. The execution of this Contract or Job Order or Job Order by Contractor shall operate as an
express acknowledgment that the indemnification obligation is part of the bid documents and/or
Contract or Job Order Documents for the Project and the monetary limitation on indemnification in
this Article bears a reasonable commercial relationship to the Contract.
9.5.4. Nothing in this Artilce is intended, or should be construed, to negate, abridge or otherwise
reduce the other rights and .obligations of indemnity that may otherwise exist as to a party
described in this Article.
9.5.5. Nothing in this Article is intended to create in the public or any member thereof, a third
party beneficiary hereunder, or to authorize anyone not party to this Contract, to maintain a suit
for personal injuries or property damage pursuant to the terms or provisions of this Contract.
9.5.6. The indemnification obligations set forth herein shall survive the termination and/or
expiration of this Contract.
ARTICLE 10. CHANGES IN THE WORK;EXTENSIONS TO THE JOB ORDER COMPLETION TIME.
10.1. Changes in the Work or Terms of Contractor Job Order or Job Order Documents.
10.1.1. Changes to the Contract or Job Order or Job Order_may be accomplished after execution
of the Contract or Job Order or Job Order and without invalidating the Contract, by Change Order.
10.1.2. Any changes to the terms of the Contract or Job Order Documents must be contained in a
Change Order, executed by the Parties hereto, with the same formality and of equal dignity prior to
the initiation of any work reflecting such change. This section shall not prohibit the issuance of
Change Orders executed only by City as hereinafter provided.
10.2. Field Orders.
10.2.1. The Contract or Job Order or Job Order Administrator, through Consultant, shall have the
right to approve and issue Field Orders setting forth written interpretations of the intent of the
Contract or Job Order Documents and ordering minor changes in Work execution, providing the
Field Order involves no change in the Contract Job Order Price or the Contract or Job Order Time.
10.2.2. Consultant shall have the right to approve and issue supplemental instructions setting forth
- written orders, instructions, or interpretations concerning the Contract or Job Order Documents or
its performance, provided such supplemental instructions involve no change in the Contract Job
Order Price or the Contract or Job Order Time.
10.3. Change Orders.
10.3.1. Changes in the quantity or character of the Work which are not the subject of Field Orders
or supplemental instructions, including all changes resulting in changes in the Contract Job Order
65 I 2019-257-KB
Price, or the Contract or Job Order Time, shall only be authorized only by Change Orders
approved in advance by the City. Changes in the Work shall be performed under applicable
provisions of the Contract or Job Order or Job Order Documents, and the Contractor shall
proceed promptly, unless otherwise provided in the Change Order or Construction Change
Directive.
10.3.2. All Change Orders which exceed the then-remaining amounts available in the Owner's
Contingency shall be approved by the City Commission. All other Change Orders, if funded by
then-remaining amounts available in the Owner's Contingency, shall be approved in advance by
the City Manager or the City Manager's designee. Notwithstanding the foregoing, the City
Manager, at his or her sole discretion, may elect to present any proposed Change Order to the City
Commission for its consideration.
10.3.3. If City requests a change in the Work, City shall submit a change request to Contractor,
in writing. Within seven (7) business days of Contractor's receipt of such request from the City,
Contractor shall provide to the City a Job Order Proposal. The Job Order Proposal to the City is
to include (i) the proposed increase or decrease, if any, in the Cost of the Work which would
result from such a change, (ii) the effect, if any, upon the Contract or Job Order Time by reason
of such proposed change, (iii) supporting data and documentation, including any requested by
the City in its change request, and iv) all other Job Order Proposal documentation required by
the Contract Documents as specified in the JOC Supplemental Conditions.
10.3.4. If the Contractor proposes a change in the Work, such proposal must be accompanied
by a-Job Order Proposal with sufficient substantiating data to permit evaluation by the City. If the
Contractor does submit.a Job.Order Proposal,within the preceding seven (7) business day time
period, the City shall, within twenty-one (21) days following its receipt of such Job Order
Proposal, notify the Contractor as to whether the City agrees with such Job Order Proposal and
wishes to accept the Contractor's Job Order Proposal. If the City agrees with such Job Order
Proposal and wishes to accept the same, the City and the Contractor shall execute a Change
Order which at a minimum specifies: i) the detailed scope associated with the change to the
Work; ii) the amount of the adjustment in the Contract Job Order Price, if any, and (iii) the extent
of the adjustment in the Contract or Job Order Time, if any. In the event the City disagrees with
the Contractor's proposal, the City may either (i) notify the Contractor that the City has decided
to not proceed with or approve the requested change, or (ii) issue a unilateral Change Order
whose Job Order Price Proposal is prepared in accordance with the JOC Supplemental
Conditions.
10.3.5. The increase or decrease in the Contract Job Order Price resulting from a change in the
Work shall be equal to the total amount specified on the Job Order Price Proposal, which shall be
prepared in accordance with the Contract Documents as specified in the JOC Supplemental
Conditions.
10.3.6. Decreases in the Cost of the Work due to a change in the Project shall result in a decrease
to the Contract Job Order Price, by way of a deductive Change Order. Credits for Pre-priced and
Non Pre-priced Tasks shall *be calculated at the pre-set Unit Prices and multiplied by the
appropriate Adjustment Factors. The result is that a;credit for tasks that have been deleted from
66 I 2019-257-KB
the Detailed Scope of Work will be given at 100% of the value at which they were included in the
original Job Order Price Proposal.
10.4. NOT USED
10.5. No Damages for Delay. NO CLAIM FOR DAMAGES OR ANY CLAIM, OTHER THAN
FOR AN EXTENSION OF TIME, SHALL BE MADE OR ASSERTED AGAINST CITY BY
REASON OF ANY DELAYS EXCEPT AS PROVIDED HEREIN. Contractor shall not be entitled
to an increase in the Contract Job Order Price or payment or compensation of any kind from City
for direct, indirect, consequential, impact or other costs, expenses or damages, including but not
limited to costs of acceleration or inefficiency, arising because of delay, disruption, interference or
hindrance from any cause whatsoever, whether such delay, disruption, interference or hindrance
be reasonable or unreasonable, foreseeable or unforeseeable, or avoidable or unavoidable; and
irrespective of whether such delay constitutes an Excusable Delay and irrespective of whether
such delay results in an extension of the Contract or Job Order Time; provided, however,
Contractor's hindrances or delays are not due solely to fraud, bad faith or willful or intentional
interference by the City in the performance of the Work, and then only where such acts continue
after Contractor's written notice to the City of such alleged interference.
10.9.1. Contractor acknowledges and agrees that Excusable Delay shall not be deemed to
constitute willful or intentional interference with the Contractor's performance of the Work without
clear and convincing proof that they were the result of a deliberate act, without any reasonable and
good-faith basis, and were specifically intended to disrupt the Contractor's performance of the
Work. The City's attempts to facilitate or assist Contractor in performance of the Work shall in no
way be construed, interpreted and/or be deemed to constitute willful or intentional interference with
the Contractor's performance of the Work.
Except as provided herein, Contractor hereby waives all other remedies at law or in equity that it
might otherwise have against the City on account of any Excusable Delay and any and all other
events that may, from time to time, delay the Contractor in the performance of the Work.
Contractor acknowledges and agrees that, except as specified herein, all delays or. events and
their potential impacts on the performance by the Contractor are specifically contemplated and
acknowledged by the Parties in entering into this Agreement and that Contractor's pricing of the
Work and the determination of the Contract Job Order Price shall be expressly based on the
Contractor's assumption of the risks thereof, and Contractor hereby waives any and all Claims it
might have for any of the foregoing losses, costs, damages and expenses.
10.6. Excusable Delay. Contractor's sole remedy for Excusable Delay is an extension of the
Contract or Job Order Time for each day of critical path delay, but only if the pre-requisites and
notice requirements set forth below in this Article 10 have been timely and properly satisfied. An
excusable delay is one that (i) directly impacts critical path activity delineated in the Project
Schedule and extends the time for completion of the Work; (ii) could not reasonably have been
mitigated by Contractor, including by re-sequencing, reallocating or redeploying and/or increasing
the amount of its forces to other portions of the Work; and (iii) is caused by circumstances beyond
the control and due to,no fault of Contractor or its Subcontractors, material persons, Suppliers, or
Vendors, including, but not limited to, force majeure events such as fires, floods, labor disputes,
67 I 2019-257-KB
•
epidemics, hurricanes, or similar events beyond the control and due to no fault of the Contractor
("Excusable Delay"). If two or more separate events of Excusable Delay are concurrent with each
other, Contractor shall only be entitled to an extension of time for each day of such concurrent
critical path delay, and Contractor shall not be entitled to double recovery thereon. For illustration
purposes only, if two events of Excusable Delay are concurrent for two days, Contractor shall only
receive a time extension of a total of two days, and not four days.
10.10.1. Weather. Extensions to the Contract or Job Order Time for delays caused by the
effects of inclement weather shall be submitted as a request for a change in the Contract or Job
Order Time pursuant to the Contract or Job Order or Job Order Documents. These time
extensions are justified only when rains or other inclement weather conditions prevent Contractor
from productively performing critical path activity delineated in the Project Schedule:
(1) Contractor being unable to work at least fifty percent(50%)of the normal workday
on critical path activity delineated in the Project Schedule due to adverse weather conditions; or
(2) Contractor must make major repairs to the Work damaged by weather. Providing
the damage was not attributable to a failure to perform or neglect by Contractor, and providing that
Contractor was unable to work at least fifty percent (50%) of the normal workday on critical path
activity delineated in the Project Schedule.
10.10.2. Compensable Excusable Delay. Notwithstanding the foregoing, Excusable Delay is
compensable when (i) the delay extends the Contract or Job Order Time, (ii) is caused by
circumstances beyond the control of the Contractor or its subcontractors, suppliers or vendors, and
(iii) is caused solely by fraud, bad faith or active interference on the part of City or its agents,
provided, however, that in no event shall Contractor be compensated for (x) interim delays which
do not extend the Contract or Job Order Time, or (y) for Excusable Delay if caused jointly or
concurrently by Contractor or its subcontractors, suppliers or vendors and by the City or
Consultant, in which case then Contractor shall be entitled only to a time extension and no further
compensation for the Excusable Delay.
10.10.3. Unexcusable Delays. "Unexcusable Delay" shall mean any delays not included
within the definition of Excusable Delay as set forth above including any delay which extends the
completion of the Work or portion of the Work beyond the time specified in the Project Schedule,
including, without limitation, the date for Substantial Completion or Final Completion, and which is
caused by the act, fault, inaction or omission of the Contractor or any Subcontractor, Supplier or
other party for whom the Contractor is responsible; any delay that could have been limited or
avoided by Contractor's timely notice to the City of such delay; or any delay in obtaining licenses,
permits or inspections caused by the actions or omissions of the Contractor or its Subcontractors,
Suppliers or any other party for whom the Contractor is responsible An Unexcusable Delay shall
not be cause for granting an extension of time to complete any Work or any compensation
whatsoever, and shall subject the Contractor to damages in accordance with the Contract or Job
Order or Job Order Documents: In no event shall the Contractor be excused for interim delays
which do not extend the Project Schedule, including the date for Substantial Completion or Final
Completion.
68 I 2019-257-KB
10.7. Prerequisites and Notice Requirements for Extensions of Time. Except as provided in
the Contract or Job Order Documents with respect to Changes in the Work, an extension of the
Contract or Job Order Time will only be granted by the City under the following circumstances: (a)
if a delay occurs as a result of an Excusable Delay, and (b) the Contractor has complied with each
of the following requirements below to the reasonable satisfaction of the City:
a. Contractor shall provide written notice to the City of any event of delay or potential
delay within five (5) days of the commencement of the event giving rise to the request. The
Contractor, within ten (10) days of the date upon which the Contractor has knowledge of the delay,
shall notify the City, in writing, of the cause of the delay stating the approximate number of days the
Contractor expects to be delayed, and must make a request for an extension of time, if applicable,
to the City, in writing, within ten (10) days after the cessation of the event causing the delay
specifying the number of days the Contractor believes that its activities were in fact delayed by the
cause(s) described in its initial notice.
b. The Contractor must show to the reasonable satisfaction of the City that the activity
claimed to have been delayed was in fact delayed by the stated cause of delay, that the critical
path of the Work was materially affected by the delay, that the delay in such activity was not
concurrent with any. Unexcusable Delay, the delay was not the result of the performance of unit
price Work, and that the delay in such activity will result in a delay of the date for Substantial
Completion in the Project Schedule or Final Completion.
c. The initial notice provided by the Contractor under Subsection (a) above shall provide
an estimated number of days the Contractor believes it will be delayed, and describe the efforts of
the Contractor that have been,or are going to be undertaken to overcome or remove the Excusable
Delay and to minimize the potential adverse effect on the cost and time for performance of the
Work resulting from such Excusable Delay. The mere written notice of an event of delay or
potential delay, without all of the aforementioned required information, is insufficient and will not toll
the time period in which the Contractor must provide proper written notice under this Article.
CONTRACTOR'S STRICT COMPLIANCE WITH THIS ARTICLE 10 IS A CONDITION
PRECEDENT TO RECEIPT OF AN EXTENSION OF THE CONTRACT OR JOB ORDER TIME.
FAILURE OF THE CONTRACTOR TO COMPLY WITH ALL REQUIREMENTS AS TO ANY
PARTICULAR EVENT OF DELAY, INCLUDING THE REQUIREMENTS OF THIS SECTION,
SHALL BE DEEMED CONCLUSIVELY TO CONSTITUTE A WAIVER, ABANDONMENT OR
RELINQUISHMENT OF ANY ENTITLEMENT TO AN EXTENSION OF TIME AND ALL CLAIMS
RESULTING FROM THAT PARTICULAR EVENT OF PROJECT DELAY. Once the Parties have
mutually agreed as to the adjustment in the Contract or Job Order Time due to an Excusable
Delay, they shall enter into a Change Order documenting the same.
If the City and Contractor cannot resolve a request for time extension made properly and timely
under this Section within sixty(60) days following Contractor's initial notice of the events giving rise
to the request for a time extension, the Contractor may re-submit the request as a Claim in
accordance with the Contract or Job Order or Job Order Documents.
10.8. Contractor's Duty. Notwithstanding the provisions of this Agreement allowing the
Contractor to claim delay due to Excusable Delay, whenever an Excusable Delay shall occur, the
69 I 2019-257-KB
Contractor shall use all reasonable efforts to overcome or remove any such Excusable Delay, and
shall provide the City with written notice of the Contractor's recommendations on how best to
minimize any adverse effect on the time and cost of performing the Work resulting from such
Excusable Delay. In furtherance of the foregoing, whenever there shall be any Excusable Delay,
the Contractor shall use all reasonable efforts to adjust the Project scheduling and the sequencing
and timing of the performance of the Work in a manner that will avoid, to the extent reasonably
practicable,.any Excusable Delay giving rise to an actual extension in the time for performance of
the Work.
If there are corresponding costs associated with any of the measures which the Contractor deems
necessary or desirable to minimize any adverse effects resulting from any Excusable Delay, the
Contractor shall advise the City of such anticipated associated costs and shall not proceed with
such measures absent the City's executing a Change Order in connection therewith. Nothing in this
Section shall, however, be deemed to entitle the Contractor to any adjustment in the Contract Job
Order Price or any other damages, losses or expenses resulting from an Excusable Delay; nor
shall it be deemed to obligate the City to agree to undertake any recommendations suggested by
the Contractor as a means of minimizing the adverse effects of any Excusable Delay.
10.9. Differing Site Conditions. In the event that during the course of the Work Contractor
encounters subsurface or concealed conditions at the Project Site which could not have reasonably
been identified by Contractor upon prior investigation, and materially differ from those indicated in
the Contract or Job Order or Job Order Documents, or if unknown physical conditions of an
unusual nature are encountered on the Project Site and differ materially from those ordinarily
encountered and generally recognized as inherent in work of the character called for in the
Contract or Job Order or Job Order Documents, then Contractor shall promptly notify the City
within two (2) business days of the specific materially differing site conditions, before the
Contractor disturbs the conditions or performs the affected Work.
10.13.1. Consultant and City shall, within two (2) business days after receipt of Contractor's
written notice, investigate the site conditions identified by Contractor. If, in the sole opinion of
Consultant, the conditions do materially so differ and cause ,an increase, or decrease in
Contractor's cost of, or the time required for, the performance of any part of the Work, Consultant
shall recommend an equitable adjustment to the Contract Job Order Price, or the Contract or Job
Order Time, or both. If City and Contractor cannot agree on an adjustment in the Contract Job
Order Price or Contract or Job Order Time, the adjustment shall be referred to Consultant for
determination in accordance with the provisions of Contract or Job Order or Job Order Documents.
Should Consultant determine that the conditions of the Project Site are not so materially different to
justify a change in the terms of the Contract, Consultant shall so notify City and Contractor in
writing, stating the reasons, and such determination shall be final and binding upon the parties
hereto.
10.13.2. An adjustment for differing site conditions shall not be allowed, and any Claim relating
thereto shall be deemed conclusively waived, if the Contractor has not provided the required
written notice within two (2) business days of discovery of the site conditions, or has disturbed the
site conditions prior to City's examination thereof. If a differing site condition qualifies for an
equitable adjustment pursuant to the Contract or Job Order or Job Order Documents, and the
Contractor's costs cannot reasonably be established at the time of notice to the City thereof, the
70 I 2019-257-KB
Contractor shall submit its proposed pricing and/or request for extension of time within ten (10)
days after the proposed solution is identified to the differing site condition described in the
Contractor's initial notice to the City.
10.13.3. For purposes of this Section, a "materially differing" site condition is one that (1) is not
identified in the Contract or Job Order Documents and is not reasonably inferable therefrom; and
(2) could not have reasonably been identified by Contractor upon prior investigation, provided
Contractor reasonably undertook such prior site investigation; and (3) requires a change to the
Work that increases Contractor's costs and/or impacts the critical path for completion of the Work.
10.13.4. Where Site Conditions delay the Project, and said delay could have been avoided by
reasonable investigations of the Project Site at any time prior to commencement of the Work in
question, such delay shall not be considered to be an Excusable Delay beyond the control of the
Contractor, and no time extension shall be granted. No request for an equitable adjustment or
change to the Contract or Job Order Time for differing Site Conditions shall be allowed if made
after the date certified as the Substantial Completion date.
ARTICLE 11. CLAIMS AND RESOLUTION OF DISPUTES.
11.1 Claims must be initiated by written notice and, unless otherwise specified in the Contract
or Job Order or Job Order Documents, submitted to the other Party within ten (10) days of the
event giving rise to such Claim or within ten (10) days after the claimant reasonably should have
recognized the event or condition giving rise to the Claim, whichever is later. Such Claim shall
include sufficient information to advise the other party of the circumstances giving rise to the Claim,
the specific contractual adjustment or relief requested including, without limitation, the amounts and
number of days of delay sought, and the basis of such request. The Claim must include all job
records and other documentation supporting entitlement, the amounts and time sought. In the
event additional time is sought, the Contractor shall include a time impact analysis to support such
Claim. The City shall be entitled to request additional job records or documentation to evaluate the
Claim. The Claim shall also include the Contractor's written notarized certification of the Claim in
accordance with the False Claims Ordinance, Sections 70-300 et seq., of the City Code.
11.2 Claims not timely made or otherwise not submitted in strict accordance with the
requirements of this Article or other Contract or Job Order Documents shall be deemed
conclusively waived, the satisfaction of which shall be conditions precedent to entitlement.
11.3 Contractor assumes all risks for the following items, none of which shall be the subject of
any Change Order or Claim and none of which shall be compensated for except as they may have
been included in the Contractor's Contract Job Order Price as provided in the Contract or Job
Order or Job Order Documents: Loss of any anticipated profits, loss of bonding capacity or
capability losses, loss of business opportunities, loss of productivity on this or any other project,
loss of interest income on funds not paid, inefficiencies, costs to prepare a bid, cost to prepare a
quote for a change in the Work, costs to prepare, negotiate or prosecute Claims, and loss of
projects not bid upon, or any other indirect.and consequential costs not listed herein. No
compensation shall be made for loss of anticipated profits from any deleted Work.
•
71 I 2019-257-KB
11A Continuing the Work During Disputes. Contractor shall carry on the Work and adhere to
the progress schedule during all disputes or disagreements with City, including disputes or
disagreements concerning a request for a Change Order, a request for a change in the Contract
Job Order Price or Contract or Job Order Time. The Work shall not be delayed or postponed
pending resolution of any disputes or disagreements. Contractor's failure to comply with this
Section shall constitute an Event of Default.
ARTICLE 12. PERMITS, LICENSES, FEES,TAXES.
12.1 Except as otherwise provided within the Contract or Job Order or Job Order Documents,
all permits and licenses required by federal, state or local laws, rules and regulations necessary for
the prosecution of the Work undertaken by Contractor pursuant to this Contract or Job Order or
Job Order shall be secured and paid for by Contractor. It is Contractor's responsibility to have and
maintain appropriate Certificate(s) of Competency, valid for the Work to be performed and valid for
the jurisdiction in which the Work is to be performed for all persons working on the Project for
whom a Certificate of Competency is required.
12.2 Impact fees levied by the City and/or Miami-Dade County shall be paid by Contractor.
Contractor shall be reimbursed only for the actual amount of the impact fee levied by the
municipality or Miami-Dade County as evidenced by an invoice or other acceptable documentation
issued by the municipality. Reimbursement to Contractor in no event shall include profit or
overhead of Contractor.
12.3 All fees, royalties, and claims for any invention, or pretended inventions, or patent of any
article, material, arrangement, appliance, or method that may be used upon or in any manner be
connected with [he construction of the Work or appurtenances, are hereby included in the prices
stipulated in Construction Documents for said work.
12.4 Taxes. Contractor shall pay all applicable sales, consumer, use and other taxes required
by law. Contractor is responsible for reviewing the pertinent state statutes involving state taxes
and complying with all requirements.
ARTICLE 13.TERMINATION.
13.1. Termination for Convenience. In addition to other rights the City may have at law and
pursuant to the Contract or Job Order Documents with respect to cancellation and termination of
the Contract, the City may, in its sole discretion, terminate for the City's convenience the
performance of Work under this Contract, in whole or in part, at any time upon written notice to the
Contractor. The City shall effectuate such Termination for Convenience by delivering to the
Contractor a Notice of Termination for Convenience, specifying the applicable scope and effective
date of termination, which termination shall be deemed operative as of the effective date specified
therein without any further written notices from the City required. Such Termination for
Convenience shall not be deemed a breach of the Contract, and may be issued by the City with or
without cause.
a. Upon receipt of such Notice of Termination for Convenience from the City, and except
as otherwise directed by the City, the Contractor shall immediately proceed with the following
obligations, regardless of any delay in determining'or adjusting any amounts due under this Article:
72 I 2019-257-KB
i. Stop the Work specified as terminated in the Notice of Termination for
Convenience;
ii. Promptly notify all Subcontractors of such termination, cancel all contracts and
purchase orders to the extent they relate to the Work terminated to the fullest
extent possible and take such other actions as are necessary to minimize
demobilization and termination costs for such cancellations;
iii. Immediately deliver to the City all Project records, in their original/native electronic
format (i.e. CAD, Word, Excel, etc.), any and all other unfinished documents, and
any and all warranties and guaranties for Work, equipment or materials already
installed or purchased;
iv. If specifically directed by the City in writing, assign to the City all right, title and
interest of Contractor under any contract, subContract or Job Order or Job Order
and/or purchase order, in which case the City shall have the right and obligation to
settle or to pay any outstanding claims arising from said contracts, subcontracts or
purchase orders;
v. Place no further subcontracts or purchase orders for materials, services, or
facilities, except as necessary to complete the portion of the Work not terminated
(if any) under the Notice of Termination for Convenience;
vi. As directed by the City, transfer title and deliver to the City (1) the fabricated and
non-fabricated parts, Work in progress, completed Work, supplies and other
material produced or required for the Work terminated; and (2) the completed or
partially completed Project records that, if this Contract or Job Order or Job Order
had been completed,would be required to be furnished to the City;
vii. Settle all outstanding liabilities and termination, settlement proposals from the
termination of any subcontracts or purchase orders, with the prior approval or
ratification to the extent required by the City(if any); •
viii. Take any action that may be necessary, or that the City may direct, for the
protection and preservation of the Project Site, including life safety and any
property related to this Contract or Job Order or Job Order that is in the
Contractor's possession and in which the City has or may acquire an interest; and
ix. Complete performance of the Work not terminated (if any).
b. Upon issuance of such Notice of Termination for Convenience, the Contractor shall
only be entitled to payment for the Work satisfactorily performed up until the date of its receipt of
such Notice of Termination for Convenience, but no later than the effective date specified therein.
Payment for the Work satisfactorily performed shall be determined by the City in good faith, in
accordance with the percent completion of the Work, less all amounts previously paid to the
Contractor in approved Applications for Payment, the reasonable costs of demobilization and
reasonable costs, if any, for canceling contracts and purchase orders with Subcontractors to the
extent such costs are not reasonably avoidable by the Contractor.
Contractor shall submit, for the City's review and consideration, a final termination payment
proposal with substantiating documentation, including an updated Schedule of Values, within 30
days of the effective date of termination, unless extended in writing by the City upon request. Such
termination amount shall be mutually agreed upon by the City and the Contractor and absent such
agreement, the City shall, no less than fifteen (15) days prior to making final payment, provide the
Contractor with written notice of the amount the City intends to pay to the Contractor. Such final
payment so made'to the Contractor shall be in full and final settlement for Work performed under
73 12019-257-KB
this Contract, except to the extent the Contractor disputes such amount in a written notice
delivered to and received by the City prior to the City's tendering such final payment.
13.2. Event of Default. Th'e following shalt each be considered an item of Default. If, after
delivery of written notice from the City to Contractor specifying such Default, the Contractor fails to
promptly commence and thereafter complete the curing of such Default within a reasonable period
of time, not to exceed twenty-one (21) days, after the delivery of such Notice of Default, it shall.be
deemed an Event of Default, which constitutes sufficient grounds for the City to terminate
Contractor for cause:
a. Failing to perform any portion of the Work in a manner consistent with the
requirements of the Contract or Job Order Documents or within the time required therein; or failing
to use the Subcontractors, entities and personnel as identified and to the degree specified, in the
Contract or Job Order or Job Order Documents, subject to substitutions approved by the City in
accordance with this Contract or Job Order or Job Order and the other Contract or Job Order or
Job Order Documents;
b. Failing, for reasons other than an Excusable Delay, to begin the Work required
promptly following the issuance of a Notice to Proceed;
c. Failing to perform the Work with sufficient manpower,workmen and equipment or with
sufficient materials, with the effect of delaying the prosecution of the Work in accordance with the
Project Schedule and/or delaying completion of any of the Project within the specified time;
d. Failing, for reasons other than an Excusable Delay, to timely complete the Project
within the specified time;
e. Failing and/or refusing to remove, repair and/or replace any portion of the Work as
may be rejected as defective or nonconforming with the terms and conditions of the Contract or
\Job Order or Job Order Documents;
f. Discontinuing the prosecution of the Work, except in the event of; 1) the issuance of a
stop-work order by the City; or 2) the inability of the Contractor to prosecute the Work because of
an event giving rise to an Excusable Delay as set forth in this Contract or Job Order or Job Order
for which Contractor has provided written notice of same in accordance with the Contract or Job
Order or Job Order Documents;
g. Failing to provide sufficient evidence upon request that, in the City's sole opinion,
demonstrates the Contractor's financial ability to complete the Project;
h. An indictment is issued against the Contractor;
i. Failing to make payments to for materials or labor in accordance with the respective
agreements;
j. Failing to provide the City with a Recovery Schedule in accordance with the Contract
or Job Order or Job Order Documents;
k. Persistently disregarding laws, ordinances, or rules, regulations or orders of a public
authority having jurisdiction;
I. Fraud, misrepresentation or material misstatement by Contractor in the course of
obtaining this Contract;
m. Failing to comply in any material respect with any of the terms of this Contract or Job
Order or Job Order or the Contract or Job Order or Job Order Documents.
n. Failure to submit Job Order Proposals by the due dates; and
0. Failure to submit, in the sole opinion of the City, accurate Job Order Price
Proposals that can be approved on the first or second submission.
74 I 2019-257-KB
In no event shall the time period for curing a Default constitute an extension of the time for
achieving Substantial Completion or a waiver of any of the City's rights or remedies hereunder for
a Default which is not cured as aforesaid.
13.3. Termination of Contract or Job Order or Job Order for Cause.
a. The City may terminate the Contractor for cause upon the occurrence of an Event of
Default as defined herein, or for any other breach of the Contract or Job Order or Job Order or
other Contract or Job Order Documents by the Contractor that the City, in its sole opinion, deems
substantial and material, following written notice to the Contractor and the failure to timely and
properly cure to the satisfaction of the City, in the time period set forth herein, or as otherwise
specified in the Notice of Default.
b. Upon the occurrence of an Event of Default, and without any prejudice to any other
rights or remedies of the City, whether provided by this Contract, the other Contract or Job Order
Documents or as otherwise provided at law or in equity, the City may issue a Notice of Termination
for Cause to Contractor, copied to the Surety, rendering termination effective immediately, and may
take any of the following actions, subject to any prior rights of the Surety:
i. Take possession of the Project Site and of all materials, equipment, tools,
construction equipment and machinery thereon owned by Contractor;
ii. Accept assignments of subcontracts;
iii. Direct Contractor to transfer title and deliver to the City (1) the fabricated and non-
fabricated parts, Work in progress, completed Work, supplies and other material _
produced or required for the Work terminated; and (2) the completed or partially
completed Project records that, if this Contract or Job Order or Job Order had
been completed, would be required to be furnished to the City; and
iv. Finish the Work by whatever reasonable method the City may deem expedient.
c. Upon the issuance of a Notice of Termination for Cause, the Contractor shall:
i. Immediately deliver to the City all Project records, in their original/native electronic
format (i.e. CAD, Word, Excel, etc.), any and all other unfinished or partially
completed documents, and any and all warranties and guaranties for Work,
equipment or materials already installed or purchased;
ii. If specifically directed by the City in writing, assign to the City all right, title and
interest of Contractor under any contract, subContract or Job Order or Job Order
and/or purchase order, in which case the City shall have the right and obligation to
settle or to pay any outstanding claims arising from said contracts, subcontracts or
purchase orders;
iii. As directed by the City, transfer title and deliver to the City (1) the fabricated and
non-fabricated parts, Work in progress, completed Work, supplies and other'
material produced or required for the Work terminated; and
iv. Take any action that may be necessary, or that the City may direct, for the
protection and preservation of the Project Site, including life safety and property
related to this Contract or Job Order or Job Order that is in the Contractor's
possession and in which the City has or may acquire an interest.
75 I 2019-257-KB
d. All rights and remedies of the City's Termination rights herein shall apply to all Defaults
that are non-curable in nature, or that fail to be cured within the applicable cure period or are cured
but in an untimely manner, and the City shall not be obligated to accept such late cure.
13.4. Recourse to Performance and Payment Bond; Other Remedies.
a. Upon the occurrence of an Event of Default, and irrespective of whether the City has
terminated the Contractor, the City may(I) make demand upon the Surety to perform its obligations
-under the Performance Bond and Payment Bond, including completion of the Work, without
requiring any further agreement (including, without limitation, not requiring any takeover
agreement) or mandating termination of Contractor as a condition precedent to assuming the bond
obligations; or (ii) in the alternative, the City may take over and complete the Work of the Project,
or any portion thereof, by its own devices, by entering into a new Contract or Job Order or Job
Order or contracts for the completion of the Work, or using such other methods as in the City's sole
opinion shall be required for the proper completion of the Work, including succeeding to the rights
of the Contractor under all subcontracts.
b. The City may also charge against the Performance and Payment Bond all fees and
expenses for services incidental to ascertaining and collecting losses under the Performance and
Payment Bond including, without limitation, accounting, engineering, and legal fees, together with
any and all costs incurred in connection with renegotiation of the Contract.
13.5. Costs and Expenses.
a. All damages,.costs and expenses, including reasonable attorney's fees, incurred by
the City as a result of an uncured Default or a Default cured beyond the time limits stated herein
(except to the extent the City has expressly consented, in writing, to the Contractor's late cure of
such Default), together with the costs of completing the Work, shall be deducted from any monies
due or to become due to the Contractor under this Contract, irrespective of whether the City
ultimately terminates Contractor.
b. Upon issuing a Notice of Termination for Cause, the City shall have no obligation to
pay Contractor, and the Contractor shall not be entitled to receive, any money until such time as
the Project has been completed and the costs to make repairs and/or complete the Project have
been ascertained by the City. In case such cost and expense is greater than the sum which would
have been due and payable to the Contractor under this Contract or Job Order or Job Order for
any portion of the Work satisfactorily performed, the Contractor and the Surety shall be jointly and
severally liable and shall pay the difference to the City upon demand.
13.6. Termination If No Default or Erroneous Default. If, after a Notice of Termination for
Cause is issued by the City, it is thereafter determined that the Contractor was not in default under
the provisions of this Contract, or that any delay hereunder was an Excusable Delay, the
termination shall be converted to a Termination for Convenience and the rights and obligations of
the parties shall be the same as if the notice of termination had been issued pursuant to the
termination for convenience clause contained herein. The Contractor shall have no further
recourse of any nature for wrongful termination.
76 I 2019-257-KB
•
13.7. Remedies Not Exclusive. Except as otherwise provided in the Contract or Job Order or
Job Order Documents, no remedy under the terms of this Contract or Job Order or Job Order is
intended to be exclusive of any other remedy, but each and every such remedy shall be
cumulative and shall be in addition to any other remedies, existing now or hereafter, at law, in
equity or by statute. No delay or omission to exercise any right or power accruing upon any Event
of Default shall impair any such right or power nor shall it be construed to be a waiver of any Event
of Default or acquiescence therein, and every such right and power may be exercised frorrr time to
time as often as may be deemed expedient.
13.8. Materiality and Non-Waiver of Breach. Each requirement, duty, and obligation in the
Contract or Job Order Documents is material. The City' failure to enforce any provision of this
Contract or Job Order or Job Order shall not be deemed a waiver of such provision or Amendment
of this Contract. A waiver shall not be effective unless it is in writing and approved by the City. A
waiver of any breach of a provision of this Contract or Job Order or Job Order shall not be deemed
a waiver of any subsequent breach and the failure of the City to exercise its rights and remedies
under this Article at any time shall not constitute a waiver of such rights and remedies.
13.9. Contractor Right to Terminate Contract or Job Order or Job Order or Stop Work. If
the Project should be stopped under an order of any court or other public authority for a period of
more than ninety (90) days due to no act or fault of Contractor or persons or entities within its
control, or if the City should fail to pay the Contractor any material amount owing pursuant to an
Approved Application for Payment in accordance with the Contract or Job Order Documents and
after receipt of all supporting documentation required by the Contract or Job Order or Job Order
Documents, and if the City fails to make such payment within ninety (90) days after receipt of
written notice from the Contractor identifying the Approved Application for Payment for which
payment is outstanding, then, unless the City is withholding such payment pursuant to any
provisioh of this Contract or Job Order or Job Order which entitles the City to so withhold such
payment, the Contractor shall have the right upon the expiration of the aforesaid ninety (90) day
period to stop its performance of the Work, provided that Contractor has sent a Notice to Cure to
the City via certified mail, allowing for a 7 day cure period. In such event, Contractor may
terminate this Contract or Job Order or Job Order and recover from City payment for all Work
executed and reasonable expense sustained (but excluding compensation for any item prohibited
by any provisions of the Contract or Job Order or Job Order Documents). In the alternative to
termination, Contractor shall not be obligated to recommence the Work until such time as the City
shall have made payment to the Contractor in respect of such Approved Application for Payment,
plus any actual and reasonable related demobilization and start-up costs evidenced by
documentation reasonably satisfactory to the City. No act, event, circumstance or omission shall
excuse or relieve the Contractor from the full and faithful performance of its obligations hereunder
and the completion of the Work as herein provided for.
ARTICLE 14. MISCELLANEOUS.
14.1. Separate Contracts.
14.1.1. The City reserves the right to perform construction or operations related to the Project with
the City's own forces, to award separate contracts to other contractors or subcontractors, and to
permit third parties to perform construction or operations in connection with other portions of the
77 I 2019-257-KB
Project or other construction or operations on the Project Site or adjacent to the Project Site. City
reserves the right to let other contracts in connection with this Project. Contractor shall afford other
persons reasonable opportunity for the introduction and storage of their materials and the
execution of their work and shall properly connect and coordinate this Work with theirs.
14.1.2. If any part of Contractor's Work depends for proper execution or results upon the work of
any other persons, Contractor shall inspect and promptly report to Consultant any defects in such
work that render it unsuitable for such proper execution and results. Contractor's failure to inspect
and report shall constitute an acceptance of the other person's work as fit and proper for the
reception of Contractor's Work, except as to defects which may develop in other contractor's work
after the execution of Contractor's Work.
14.1.3. Contractor shall conduct its operations and take all reasonable steps to coordinate the
prosecution of the Work so as to create no interference or impact on any other contractors,
including the City's own forces, on the site. Should such interference or impact occur, Contractor
shall be liable to the affected contractor for the cost of such interference or impact. Coordination
with other contractors shall not be grounds for an extension of time or any adjustment in the
Contract Job Order Price. Contractor agrees that its pricing of the Work and the determination of
the Contract Job Order Price were expressly based upon the Contractor's assumption of the
foregoing cost risks
14.1.4. Contractor shall afford other contractors reasonable access to the Project Site for the
execution of their work. Following the request of the City or Consultant, the Contractor shall
prepare a plan in order to integrate the work to be performed by the City or by the other contractors
with the performance of the Work, and shall submit such plan to the City for approval. The
Contractor shall arrange the performance of the Work so that the Work and the work of the City
and the other contractors are, to the extent applicable, properly integrated, joined in an acceptable
manner and performed in the proper sequence, so that any disruption or damage to the Work or to
any work of the City or of other contractors is avoided. To insure the proper execution of
subsequent work, Contractor shall inspect the work already in place and shall at once report to
Consultant any discrepancy between the executed work and the requirements of the Contract or
Job Order or Job Order Documents.
14.2. Lands for Work.
14.2.1. City shall provide, as may be indicated in the Contract or Job Order or Job Order
Documents, the lands upon which the Work is to be performed, rights-of-way and easements for
access thereto and such other lands as are designated by City or the use of Contractor.
14.2.2. Contractor shall provide, at Contractor's own expense and without liability to City, any
additional land and access thereto that may be required for temporary construction facilities, or for
storage of materials. Contractor shall furnish to City copies of written permission obtained by
Contractor from the owners of such facilities.
14.3. Assignment. Neither the City nor the Contractor shall assign its interest in this Contractor
Job Order or Job Order without the written consent of the other, except as to the assignment of
proceeds. Notwithstanding the foregoing, City may assign its interest in this Contract or Job Order
78 12019-257-KB
or Job Order or any portion thereof to any local or state governmental body, special taxing district,
or any person authorized by law to construct or own the Project. Such assignee shall be bound to
comply with the terms of this Contract.
14.4. Rights of Various Interests. [CIP—ISNT THIS SAME AS SEPARATE CONTRACTORS
PROVISION?] Whenever work being done by City's forces or by separate contractors is
contiguous to or within the area where the Contractor will perform any of the Work pursuant to the
Contract or Job Order or Job Order Documents, , the respective rights of the various interests
involved shall be established by the Contract or Job Order or Job Order Administrator to secure the
completion of the various portions of the work in general harmony.
14.5. Legal Restrictions and Traffic Provisions. Contractor shall conform to and obey'all
applicable laws, regulations, or ordinances with regard to labor employed, hours of work and
Contractor's general operations. Contractor shall conduct its operations so as not to close any
thoroughfare, nor interfere in any way with traffic on railway, highways, or water, without the prior
written consent of the proper authorities.
14.6. Value Engineering: Contractor may request substitution of materials, articles,
pieces of equipment or any changes that reduce the Job Order Price by making such
request to the Consultant during the Job Order development process. Consultant will be
the sole judge of acceptability, and no substitute will be ordered, installed, used or
initiated without Consultant's prior written acceptance which will be evidenced by either a
Change Order or an approved Shop Drawing. However, any substitution accepted by
Consultant shall not result in any increase in the Job Order Price or Job Order
Completion Time.
•
ANY REQUESTS FOR SUBSTITUTION MUST BE MADE TO THE CITY'S PROCUREMENT
DIRECTOR, WHO.,,SHALL FORWARD SAME TO CONSULTANT.
14.7. No Interest. Any monies not paid by City when claimed to be due to Contractor under this
Contract, including, but not limited to, any and all claims for Contract or Job Order or Job Order
damages of any type, shall not be subject to interest including, but not limited to prejudgment
interest. However,the provisions of City's prompt payment ordinance, as such relates to timeliness
of payment, and the provisions of Section 218.74(4), Florida Statutes as such relates to the
payment of interest, shall apply to valid and proper invoices.
14.8. Project Sign. Any requirements for a project sign shall be paid by the Contractor as
specified by City Guidelines.
14.9. Availability of Project Site: Removal of Equipment.
14.9.1. Use of the Project Site or any other City-owned property or right-of-way for the purpose of
storage of equipment or materials, lay-down facilities, pre-cast material fabrication, batch plants for
the production of asphalt, concrete or other construction-related materials, or other similar
activities, shall require advance written approval by the Contract or Job Order or Job Order
Administrator. The City may, at any time, in its sole and absolute discretion, revoke or rescind
such approval for any reason. Upon notice of such rescission, Contractor shall, within twenty-four
79 I 2019-257-KB
(24) hours, remove and relocate any such materials and equipment to a suitable, approved
location. Notwithstanding any other provision in the Contract or Job Order Documents to the
contrary, the conditions or requirements of right-of-way permits established by the authorities
having jurisdiction including, without limitation any regulatory authorities of the City, shall take
precedence over any provision in the Contract or Job Order Documents,that may provide any right
whatsoever to use of the Project Site for staging, material and equipment storage, lay-down or
other similar activities.
14.9.2. In case of termination of this Contract or Job Order or Job Order before completion for any
cause whatever, Contractor, if notified to do so by City, shall promptly remove any part or all of
Contractor's equipment and supplies from the property of City, failing which City shall have the
right to remove such equipment and supplies at the expense of Contractor.
14.10. Nondiscrimination. In connection with the performance of the Services, the Contractor
shall not exclude from participation in, deny the benefits of, or subject to discrimination anyone on
the grounds of race, color, national origin, sex, age, disability, religion, income or family status.
Additionally, Contractor shall comply fully with the City of Miami Beach Human Rights Ordinance,
codified in Chapter 62 of the City Code, as may be amended from time to time, prohibiting
discrimination in employment, housing, public accommodations, and public services on account of
actual or perceived race, color, national origin, religion, sex, intersexuality, gender identity, sexual
orientation, marital and familial status, age, disability, ancestry, height, weight, domestic partner
status, labor organization membership,familial situation, or political affiliation.
14.11. Proiect Records. City shall have the right to inspect and copy, at City's expense, the
books and records and accounts of Contractor which relate in any way to the Project, and to any
claim for additional compensation made by Contractor, and to conduct an audit of the financial and
accounting records of Contractor which relate to the Project and to any claim for additional
compensation made by Contractor. Contractor shall retain and make available to City all such
books and records and accounts, financial or otherwise, which relate to the Project and to any
claim for a period of three (3) years following Final Completion of the Project. During the Project
and the three (3) year period following Final Completion of the Project, Contractor shall provide
City access to its books and records upon seventy-two(72) hours written notice.
14.12. Performance Evaluations. An interim performance evaluation of the successful
Contractor may be submitted by the Contract or Job Order or Job Order Administrator during
construction of the Project. A final performance evaluation shall be submitted when the Request
for Final Payment to the construction contractor is forwarded for approval. In either situation, the
completed evaluation(s) shall be forwarded to the City's Procurement Director who shall provide a
copy to the successful Contractor. Said evaluation(s) may be used by the City as a factor in
considering the responsibility of the successful Contractor for future bids with the City.
14.13. Public Entity Crimes. In accordance with the Public Crimes Act, Section 287.133, Florida
Statutes, a person or affiliate who is a contractor, consultant or other provider, who has been
placed on the convicted vendor list following a conviction for a public entity crime(may not submit a
bid on a Contract or Job Order or Job Order to provide any goods or services to the City, may not
submit a bid on a Contract or Job Order or Job Order with the City for the construction or repair of
80 I 2019-257-KB
a public building or public work, may not submit bids on leases of real property to the City, may not
be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a —
Contract or Job Order or Job Order with the City, and may not transact any business with the City
in excess of the threshold amount provided in Section 287.017, Florida Statutes, for category two
purchases for a period of 36 months from the date of being placed on the convicted vendor list.
Violation of this Section by Contractor shall result in cancellation of the City purchase and may
result in Contractor debarment.
14.14. Independent Contractor. Contractor is an independent contractor under this Contract.
Services provided by Contractor pursuant to this Contract or Job Order or Job Order shall be
subject to the supervision of Contractor. In providing such services, neither Contractor nor its
agents shall act as officers, employees, or agents of the City. This Contract or Job Order or Job
Order shall not constitute or make the parties a partnership or joint venture. Contractor hereby
accepts complete responsibility as a principal for its agents, Subcontractors, vendors, materialmen,
suppliers, their respective employees, agents and. persons acting for or on`their behalf, and all
others Contractor hires to perform or to assist in performing the Work.
14.15. Third Party Beneficiaries. Neither Contractor nor City intends to directly or substantially
benefit a third party bythis Contract. Therefore, the parties agree that there are no third party
beneficiaries to this Contract or Job Order or Job Order and that no third party shall be entitled to
assert a claim against either of them based upon this Contract. The parties expressly acknowledge
that it is not their intent to create any rights or obligations in any third person or entity under this
Contract.
14.16. Severability. In the event a portion of this Contract or Job Order or Job Order is found by
a court of competent jurisdiction to be invalid, the remaining provisions shall continue to be
effective unless City or Contractor elects to terminate this Contract. An election to terminate this
• Contract or Job Order or Job Order based upon this provision shall be made within seven (7) days
after the finding by the court becomes final.
•
81 I 2019-257-KB
APPENDIX D
Ai
Fir .... e', a.
Contract
82 I 2019-257—KB
CONTRACT
THIS CONTRACT ("Contract") is made and entered into as of the day of
, 2019, by and between the City of Miami Beach, Florida, a municipal
corporation (the "City") and
(the "Contractor"):
WTTNESSETH, that the Contractor, for and in consideration of the payments hereinafter
specified and agreed to be made by the City, hereby covenants and agrees to furnish
and deliver all the materials required, to do and. perform all the work and labor, in a
satisfactory and workmanlike manner, required to complete this Contract within the time
specified, in strict and entire conformity with the Plans, Specifications, and other
Contract Documents, which are hereby incorporated into this Contract by reference, for:
ITB No. and Title:
The Contractor agrees to make payment of all proper charges for labor and materials
required in the aforementioned work, and to defend, indemnify and save harmless City,
and their respective officers and employees, from liabilities, damages, losses and costs
including, but not limited to, reasonable attorney's fees, to the extent caused by the
negligence, recklessness, or intentional wrongful misconduct of Contractor and persons
employed or utilized by Contractor in the performance of this Contract.
The requirements of the Contract Documents, as such term is defined in the Invitation to
Bid, are hereby incorporated by reference as if fully set forth herein. This Contract is part
of, and incorporated in, the Contract Documents as defined herein. Accordingly, all of
the documents incorporated by the Contract Documents shall govern this Project.
The Contract is an indefinite-quantity contract for construction work and services.
The Contractor shall perform all work required, necessary, proper for or incidental to
completing the Detailed Scope of Work called for in each individual Job Order issued
pursuant to this Contract for the Unit Prices set forth in the Construction Task Catalog®
and the following Adjustment Factors:
Normal Working Hours Adjustment Factor: means the hours contained in the
applicable noise ordinance, and in the event there is no applicable noise
ordinance, means the hours from 7:00 a.m. to 4:00 p.m. Monday through Friday,
except for City Holidays:
Other Than Normal Working Hours Adjustment Factor: means\the hours
outside the applicable noise ordinance, and in the event-there is no applicable
noise ordinance, means the hours of 4:01 D.M. to 6:59 a.m. Monday through
Friday and all day Saturday, Sunday, and City Holidays:
83 I 2019-257-KB
Partial and Final Payments will be made as provided for in the Contract Documents.
Whenever either party desires to give notice to the other, such notice must be in writing,
sent by certified United States Mail, postage prepaid, return receipt requested, or by
hand-delivery with a request for a written receipt of acknowledgment of delivery,
addressed to the party for whom it is intended at the place last specified.
The place for giving notice shall remain the same as set forth herein, unless such
notice information is revised in a Contract amendment duly executed by the City
and the Contractor. For the present, the parties designate the following:
For City:
Attn:
With copies to:
City Attorney
City of Miami Beach
1700 Convention Center Drive
Miami Beach, Florida 33139
For Contractor:
Attn:
84 2019-257-KB
IN WITNESS WHEREOF, the above parties have caused this Contract to be executed
by their appropriate officials as of the date first above written.
ATTEST: CITY OF MIAMI BEACH, FLORIDA
By:
Rafael E. Granado, City Clerk Jimmy L. Morales, City Manager
[seal]
ATTEST: [ 1®R',`6eLLA,
By:
Name: Name:
[seal]
85 2019-257-KB
APPENDIX E
A I
I %.
ar �
JOC INSTRUCTIONS TO- BIDDERS
•
86 I 2019-257-KB
JOC INSTRUCTIONS TO BIDDERS
1. Contract Overview: A Job Order Contract is an indefinite quantity contract pursuant
to which the Contractor may perform an ongoing series of individual Projects at
different locations throughout the City. The Contract Documents include a
Construction Task Catalog® containing construction tasks with preset Unit Prices. All
Unit Prices are based on local labor, material and equipment prices and are for the
direct cost of construction.
The Contractor will bid two Adjustment Factors to be applied to the Unit Prices. One
Adjustment Factor for performing work during Normal Working Hours and a second
Adjustment Factor for performing work during Other Than Normal Working Hours.
The same two Adjustment Factors shall apply to every Pre-priced Task in the
Construction Task Catalog®.
A Contract(s) will be awarded to the lowest, responsive, responsible Bidder(s).
Thereafter, as projects are identified the Contractor will jointly scope the work with
the City. The City will prepare a Detailed Scope of Work and issue a Request for
Proposal to the Contractor. The Contractor will then prepare a Job Order Proposal
for the Project including a Job Order Price Proposal, drawings and sketches, a list of
subcontractors and materialmen, construction schedule, and other requested
documentation. The Job Order Price shall equal the value of the approved,Job Order
Price Proposal. The value of the Job Order Price Proposal shall be calculated by
summing the total of the calculation for each Pre-priced Task (Unit Price x quantity x
Adjustment Factor) plus the value of all Non Pre-priced Tasks.
If the Job Order Proposal is found to be complete and reasonable, a Job Order may
be issued.
A Job Order will reference the Detailed Scope of Work and set forth the Job Order
Completion Time, and the Job Order Price. The Job Order Price shall be a lump
sum, fixed price for the completion of the Detailed Scope of Work. A separate Job
Order will be issued for each Project. Extra work, credits, and deletions will be
contained in a Supplemental Job Order.
2. Contract Term: The Base Term of the Contract is two (2) years. There are three (3)
Option Terms. Both parties must agree to extend the Contract for an Option Term.
The duration of each Option Term is one (1) year. The City and Contractor may
agree to extend the term of an Option Term.
•
All Job Orders issued during the term of this Contract shall be valid and in effect
notwithstanding that the Detailed Scope of Work may be performed, payments may
be made, and the guarantee period may continue, after such period has expired. All
terms and conditions of the Contract apply to each Job Order.
3. Contract Value: The Estimated Annual Value of the City's JOC program is
$15,000,000. The City may issue Job Orders up to or exceeding the Estimated
87 12019-257-KB
Annual Value. The City does not guarantee to issue this volume of Job Orders. It is
merely an estimate.
4. Adjustment Factors: There are two (2) Adjustment Factors for this Contract. When
preparing a Job Order Price Proposal, the Contractor shall select the appropriate
Adjustment Factor for each task. The Adjustment Factors are as follows:
• Normal Working Hours Adjustment Factor: Monday through Friday, 7:00 am
to 4:00 pm except holidays.
• Other than Normal Working Hours Adjustment Factor: Monday through
Friday, 4:01 pm to 6:59 am, and all day Saturday, Sunday, and holidays.
The Other than Normal Working Hours Adjustment Factor must be equal to or
greater than the Normal Working Hours Adjustment Factor.
For evaluation purposes only, the following weight distributions shall be used to
determine the Total Base Bid:
Adjustment % Weight
Factor (For Evaluation Only)
Normal Working Hours 80%
Other than Normal Working Hours 20%
All Unit Prices listed in the Construction Task Catalog° are priced at a net value of
1.0000. The Adjustment Factors shall be an increase or decrease to all the Unit
Prices listed in the Construction Task Catalog®. For example, 1.1000 would be a
10% increase to the Unit Prices and 0.9500 would be a 5% decrease to the Unit
Prices. Bidders who submit separate Adjustment Factors for separate Unit Prices
will be considered non-responsive and their bid will be rejected.
5. JOC System License Fee: The City selected The Gordian Group's (Gordian) Job
Order Contracting (JOC) System for their JOC program. The Gordian JOC Solution
includes Gordian's proprietary Gordian Cloud and Bid Safe® JOC Applications and
Construction Task Catalog®, which shall be used by the Contractor to prepare and
submit Job Order Proposals, subcontractor lists, and other requirements specified by
the City. The Contractor shall be required to execute Gordian's JOC System
License and Fee Agreement, and pay a 1% JOC System License Fee of all Job
Order issued to obtain access to the Gordian JOC Solution. The 1% JOC
System License Fee shall be included in the Contractor's Adjustment Factors.
88 I 2019-257-KB
APPENDIX F
JOC SUPPLEMENTAL CONDITIONS
89 I 2019-257-KB
JOC SUPPLEMENTAL CONDITIONS:
1. CONTRACTOR SELECTION
1.1. Job Order Contracting: The City may award an individual Job Order to any
selected Contractor. Selection of the Contractor and award of the Job Order
will be in compliance with established City procedures and based on one or
more of the following criteria:
1.1.1. Rotational selection among all Contractors, unless otherwise
determined by the City.
1.1.2. Evaluation of past and current performance on Job Orders of a similar
nature and type of work, project size, construction management
challenges, schedule performance, design management
requirements, etc.
1.1.3. Balancing of work load (Job Order dollar volume and construction
backlog) among Contractors.
1.1.4. Management of Job Order dollar volume within bonding limitations of
the Contractor.
1.1.5. Price, as it relates to the City's independent cost estimate or to an
offer from any other contractor.
1.1.6. Not-To-Exceed offers (NTE Offer) submitted by two or more
Contractors through Bid Safe®.
1.1.7. Contractor's responsiveness to the City on Job Orders.
1.1.8. Other appropriate criteria as deemed in the best interest of the City.
2. INITIATION OF A JOB ORDER
2.1. As the need exists, the City will notify the Contractor of a Project, schedule a
Joint Scope Meeting and issue a Notice of Joint Scope Meeting.
2.2. The Contractor shall attend the Joint Scope Meeting and discuss, at a
minimum:
2.2.1. the general scope of the work;
2.2.2. alternatives for performing the work and value engineering;
2.2.3. access to the site and protocol for admission;
2.2.4. hours of operation;
90 I 2019-257-KB
2.2.5. staging area;
2.2.6. requirements for catalog cuts, technical data, samples and shop
drawings;
2.2.7. requirements for professional services, sketches, drawings, and
specifications;
2.2.8. construction duration;
J
2.2.9. liquidated damages;
2.2.10: the presence of hazardous materials;
2.2.11. date on which the Job Order Proposal is due.
2.3. Upon completion of the joint scoping process, the City will prepare a draft
Detailed Scope of Work referencing any sketches, drawings, photographs,
and specifications required to document accurately the work to be
accomplished. The Contractor shall review the Detailed Scope of Work and
request any required changes or modifications. When an acceptable
Detailed Scope of Work has been prepared, the City will issue a Request for
Job Order Proposal that will require the Contractor to prepare a Job Order
Proposal. The Detailed Scope of Work, unless modified by both the
• Contractor and the City, will be the basis on which the Contractor will
develop its Job Order Proposal and the City will evaluate the same. The
Contractor does not have the right to refuse to perform any task or any work
in connection with a particular Project.
•
2.4. The City may, at its option, include quantities in the Detailed Scope of Work
if it helps to define the Detailed Scope of Work, if the actual quantities
required are not known or cannot be determined at the time the Detailed
Scope of Work is prepared, if the Contractor and the City cannot agree on
the quantities required, or for any other reason as determined by the City. In
all such cases, the City shall issue a Supplemental Job Order adjusting the
quantities appearing in the Detailed Scope of Work to the actual quantities.
3. PREPARATION OF THE JOB ORDER PROPOSAL
3.1. The Contractor's Job Order Proposal shall include, at a minimum:
3.1.1. Job Order Price Proposal;
3.1.2. Required drawings or sketches;
3.1.3. List of anticipated Subcontractors;
3.1.4. Construction schedule;
3.1.5. Other requested documents.
91 12019-257-KB
3.2. The Job Order Price shall be the value of the approved Job Order Price
Proposal.
3.3. The value of the Job Order Price Proposal shall be calculated by summing
the total of the calculations for each Pre-priced Tasks (unit price x quantity x
Adjustment Factor) plus the value of all Non Pre-priced Tasks.
3.4. The Contractor will prepare Job Order Price Proposals in accordance with the
following:
3.4.1. Pre-priced.Task: A task described in, and for which a unit price is
set forth in, the Construction Task Catalog®. The Contractor will
select the appropriate Pre-priced Tasks, and enter the accurate
quantity, and the appropriate Adjustment Factor.
3.4.2. Non Pre-priced Task: A task that is not set forth in the Construction
Task Catalog®.
3.4.3. Information submitted in support of Non Pre-priced Tasks shall
include, but not be limited to, the following:
3.4.3.1. Catalog cuts, specifications, technical data, drawings, or
other information as required to evaluate the task.
3.4.3.2. If the Contractor will perform the work with its own forces,
it shall submit three independent quotes for all material
to be installed and shall, to the extent possible, use Pre-
priced Tasks for labor and equipment from the
Construction Task Catalog®. If the work is to be
subcontracted, the Contractor must submit three
independent quotes from subcontractors. The Contractor
shall not submit a quote or bid from any supplier or
subcontractor that the Contractor is not prepared to use.
The City may require additional quotes and bids if the
suppliers or subcontractors are not acceptable or if the
prices are not reasonable. If three quotes or bids cannot
be obtained, the Contractor will provide the reason in
writing for the City's approval. If approved, less than
three quotes or bids will be allowed.
3.4.3.3. The final price submitted for Non Pre-priced Tasks shall
be according to the following formula:
A = Hourly Labor Rate (for Trades not in the
Construction Task Catalog®) x the Quantity
required
B = Direct Material Costs (supported by three quotes)
C = Direct Equipment Costs (for Equipment not in the
Construction Task Catalog®) x the Quantity
required
92 I 2019-257-KB
D = Subcontractor Costs (supported by three quotes)
E = Allowable Overhead and Profit = (A + B + C) x 15%
F = Subcontractor Allowance = D x 10%
Total Cost of Non Pre-Priced Task = A + B + C + D + E
+ F
3.4.3.4. After a Non Pre-priced Task has been approved by the
City, the Unit Price for such task will be established, and
fixed as a permanent Non Pre-priced Task which will no
longer require price justification.
3.4.3.5. The City's determination as to whether a task is a Pre-
priced Task or a Non Pre-priced Task shall be final,
binding and conclusive as to the Contractor.
3.5. Whenever, because of trade jurisdiction rules or small quantities, the cost of
a minor task in the Job Order Price Proposal is less than the cost of the
actual labor and material to perform such task, the City may permit the
Contractor to be paid for such task as a Non Pre- priced Task, or use Pre-
priced labor tasks and material component pricing to cover the actual costs
incurred. Provided, however, that there is no other work for that trade on the
Project or other work for that trade cannot be scheduled at the same time
and the final charge does not exceed $1,000.
-3.6. Contractor shall make the necessary arrangements for and obtain all filings
and permits required for the Work, including the preparation of all drawings,
sketches, calculations and other documents and information that may be
required therefor. If the Contractor is required to pay an application fee for
filing a project, a fee to obtain a building permit, or any other permit fee to
the City, State or some other governmental or regulatory agency, then the
amount of such fee paid by the Contractor for which a receipt is obtained
shall be treated as a reimbursable fee work task. The cost of expediting
services or equipment use fees are not reimbursable.
3.7. The adjustment for reimbursable fee work tasks is 1.0101.
3.8. The Contractor shall provide incidental engineering and architectural
services required in connection with a particular Job Order including
drawings and information required for filing.
3.9. The Contractor's Job Order Proposal shall be submitted by the date
indicated on the Request for Job Order Proposal. All incomplete Job Order
Proposals shall be rejected. The time allowed for preparation of the
Contractor's Job Order Proposal will depend on the complexity and urgency
of the Job Order but should average between seven and fourteen days. On
complex Job Orders, such as Job Orders requiring incidental
engineering/architectural drawings and approvals and permits, allowance will
be made to provide adequate time for preparation and submittal of the
necessary documents.
93 I 2019-257-KB
3.10. In emergency situations and minor maintenance and repair Job Orders
requiring immediate completion, the Job Order Proposal may be required
quickly and the due date will be so indicated on the Request for Job Order
Proposal or, as described below, the Contractor may be directed to begin
work immediately with the paperwork to follow.
3.11. If the Contractor requires clarifications or additional information regarding the
Detailed Scope of work in order to prepare the Job Order Proposal, the
request must be submitted so that the submittal of the Job Order Proposal is
not delayed.
4. REVIEW OF THE JOB ORDER PROPOSAL AND ISSUANCE OF THE JOB
ORDER
4.1. The City will evaluate the entire Job Order Price Proposal and compare
these with the City's estimate of the Detailed Scope of Work to determine the
reasonableness of approach, including the appropriateness of the tasks and
quantities proposed.
4.2. The Contractor may choose the means and methods of construction; subject
however, to the City's right to reject any means and methods proposed by
the Contractor that:
4.2.1. Will constitute or create a hazard to the work, or to persons or
property;
•
4.2.2. Will not produce finished Work in accordance with the terms of the
Contract; or
4.2.3. Unnecessarily increases the price of the Job Order when alternative
means and methods are available.
4.3. The City reserves the right to reject a Job Order Proposal or cancel a Project
for any reason. The City also reserves the right not to issue a Job Order if it
is determined to be in the best interests of the City. The City may perform
such work by other means. The Contractor shall not recover any costs
arising out of or related to the development of the Job Order including but not
limited to the costs to attend the Joint Scope Meeting, review the Detailed
Scope of Work, prepare a Job Order Proposal (including incidental
architectural and engineering services), subcontractor costs, and the costs to
review the Job Order Proposal with the City.
4.4. By submitting a Job Order Proposal to the City, the Contractor agrees to
accomplish the Detailed Scope of Work in accordance with the Request for
Job Order Proposal at the lump sum price submitted. It is the Contractor's
responsibility to include the necessary Pre- Priced Tasks and Non Pre-priced
Tasks and quantities in the Job O'rder Price Proposal prior to delivering it to
the City.
4.5. Each Job Order provided to the Contractor shall reference the Detailed
Scope of Work and set forth the Job Order Price and the Job Order
94 I 2019-257-KB
Completion Time. All clauses of this Contract shall be applicable to each Job
Order. The Job Order, signed by the City and delivered to the Contractor
constitutes the City's acceptance of the Contractor's Job Order Proposal. A
signed copy of the Job Order will be provided to the Contractor.
4.6. In the event that immediate emergency response is necessary, the
Contractor shall be required to follow alternative procedures as established
by the City. The Contractor shall begin work as directed notwithstanding the
absence of a fully developed Request for Job Order Proposal, Detailed
Scope of Work, or Job Order. The Contractor shall be compensated for such
work as if the work had been ordered under the standard procedures.
5. BID SAFE®
5.1. The City may issue a Request For Proposal to two or more Contractors for a
Job Order. Selection of the Contractor and award of the Job Order will be in
compliance with established City procedures.
5.2. The City reserves the right to utilize Bid Safe on a Job Order by Job Order
basis.
5.3. The City will consider several factors when determining the applicability of
Bid Safe to a Job Order including, but not limited to, the following:
5.3.1. Estimated Job Order Amount;
5.3.2. Scope Documentation, including but not limited to NE design;
5.3.3. Nature and complexity of the Work;
5.3.4. Contractors' abilities to self-perform the Work;
5.3.5. Contractors' proven capabilities on similar Work;
5.3.6. Schedule; and
5.3.7. Other appropriate criteria as deemed in the best interest of the City.
5.4. The Detailed Scope of Work will be developed by City personnel and
included with the Request For Proposal.
5.5. The City may conduct one or more site visits with all contractors designated
to receive the Request For Proposal.
5.6. All contractors that receive the Request For Proposal will have the
opportunity to submit requests for information. Should the City choose to
respond to any or all of the requests for information, the responses, and any
changes to the Request For Proposal, will be provided in an addendum to all
contractors designated to receive the Request For Proposal.
5.7. The Contractor will utilize the Bid Safe application in the Gordian Cloud
management software to provide an NTE Offer, along with any additional
requested documentation, in response to the Request For Proposal.
5.8. The City will issue an Intent to Award to the Contractor submitting the NTE
95 I 2019-257-KB
Offer that provides the best value to the City based on, but not limited to,
price and any technical factors considered.
5.9. The NTE Offer is valid for ninety (90) days from the date of opening unless
stated otherwise in the Job Order.
5.10. The Contractor that receives an Intent to Award will submit a Job Order Price
Proposal to the City. Provided that any necessary Job Order Price Proposal
modifications are completed in a timely and thorough manner, the Job Order
may be issued to the Contractor.
5.11. The Job Order Amount shall be equal to the lessor of the NTE Offer and the
Job Order Price Proposal amount.
5.12. Where the NTE Offer is less than the Job Order Price Proposal, the
difference between the NTE Offer and Job Order Price Proposal shall be •
deemed a discount offered by the Contractor. The discount amount shall be
a percent-based discount that will be calculated by the following equation:
Percent Discount = (Job Order Price Proposal Amount — NTE Offer) T Job
Order Price Proposal Amount
The discount shall be applied to subsequent Job Orders (additions or
deletions) required to complete the Work, provided the Job Order contains
materials, equipment and tasks that are similar in nature to the original
Detailed Scope of Work.
5.13. If the City exercises its right to award a Job Order utilizing Bid Safe,
collaboration between Contractors is specifically prohibited. Contractor
collaboration undermines competition, and evidence of such will be
considered a material breach of this Contract and grounds for termination for
cause.
6. ENR CCI ADJUSTMENT OF THE ADJUSTMENT FACTORS
6.1. Economic Price Adjustment: The Adjustment Factors may be updated on
each anniversary of the award date to account for' changes in construction
costs, provided, the Contractor requests in writing, approximately fourteen to
thirty days prior to the anniversary of the award date, that the Adjustment
Factors be updated. Such request shall be delivered to the City and to
Gordian. In the event the Contractor fails to deliver the request timely, then
the City shall determine the date on which the Adjustment Factors will be
updated, but in no event will such date be later than thirty days after the
written request to update the Adjustment Factors is received by the City.
Thereafter, the Contractor's Normal Working Hours and Other than Normal
Hours Adjustment Factors will be adjusted according to the following:
6.1.1. A Base Year Index shall be calculated by averaging the 12-month
Construction Cost Indices (CCI) for the average of the twenty cities
(published in the Engineering News Record (ENR) for the 12 months
immediately prior to the month of the bid due date (e.g. April bid date,
96 I 2019-257-KB
Base Year Index is April of the prior year to March of the bid date
year).
6.1.2. A Current Year Index shall be calculated by averaging the 12-month
Construction Cost Indices (CCI) for the average of the twenty cities
published in the Engineering News Record (ENR) for the 12 months
beginning with the month of anniversary of the bid due date (e.g. April
bid date, Current Year Index is April of the prior year to March of the
current year).
6.1.3. The Economic Price Adjustment shall be calculated by dividing the
Current Year Index by the Base Year Index.
6.1.4. The Contractor's original Adjustment Factors shall be multiplied by
the Economic Price Adjustment to obtain the Contractor's new
Adjustment Factors effective for the next 12 months.
6:1.5. Averages shall be obtained by summing the 12 month indices and
dividing by 12.
6.1.6. All calculations in this article shall be carried to the fifth decimal place
and rounded to the fourth decimal place. The following rules shall be
used for rounding:
6.1.7. The fourth decimal place shall be rounded up when the fifth decimal
place is five
(5) or greater.
6.1.8. The fourth decimal place shall remain unchanged when the fifth
decimal place is less than five (5).
6.2. ENR occasionally revises indices. ENR CCIs used in the calculations
described above shall be those currently published at the time the Economic
Price Adjustment calculation'is performed. No retroactive adjustments will be
made as a result of an ENR revision. Revised CCI indices, if any, shall be
used in subsequent calculations.
6.3. Under all circumstances, should the Contractor submit a Job Order Proposal
with inaccurate Adjustment Factors, the act of submission by the Contractor
is a waiver of all rights to any further compensation above the Job Order •
Price submitted in the Job Order Proposal.
6.4. The Contractor cannot delay submission of the Job Order Proposal past the
due date to take advantage of a scheduled update of the -Adjustment
Factors. In that event, the Contractor shall use the Adjustment Factors that
would have been in effect without the delay. .
7. • JOC SYSTEM LICENSE FEE
The City selected The Gordian Group's (Gordian) Job Order Contracting (JOC)
System for their JOC program. The Gordian JOC Solution includes Gordian's
proprietary Gordian Cloud and Bid Safe® JOC Applications and Construction Task
97 I 2019-257-KB
Catalog®, which shall be used by the Contractor to prepare and submit Job Order
Proposals, subcontractor lists, and other requirements specified by the City. The
Contractor shall be required to execute Gordian's JOC System License and Fee
Agreement to obtain access to the Gordian JOC Solution. The Contractor shall
pay a 1% JOC System License Fee of all Job Orders issued in connection
with this Contract. The JOC System License fee is to be included in the
Contractor's proposed Adjustment Factors.
8. ORDER OF PRECEDENCE
In the event of conflicting provisions within the Contract Documents, the JOC
Supplemental Conditions shall take precedence.
9. COOPERATIVE PURCHASING
9.1. Other agencies or members of cooperative purchasing entities ("Entities")
may purchase construction services from the Contractor utilizing this
Contract ("ezIQC Projects". If the Contract is utilized by Entities, the
Contractor agrees to pay Gordian a 6.25% license fee (eZIQC Fee) due
and payable within five (5) days from the date the Contractor receives
payment from an Entity. License Fees not paid by the specified deadline
shall bear an interest rate of 1 A% per month until paid. The Contractor shall
include the ezIQC Fee as a reimbursable task in the Job Order Price
Proposal. Gordian and the Contractor shall mutually utilize ezIQC to track
utilization, fees, and payments. The Contractor shall have no claim or right to
any portion of the License Fees. Failure to pay License Fees in a timely
manner shall be considered a material breach,of this Contract and, at the
City's sole discretion, may be deemed grounds for termination of this
Contract.
9.2. The Contractor acknowledges that The Gordian Group, Inc. will administer
cooperative purchases through this Contract and that the City has no
obligation to administer purchases by Entities.
9.3. The City and Gordian authorize the Contractor the use of the City's and
Gordian's names, logos, trademarks, and the City's and Gordian provided
materials solely for the presentation and promotion of the availability and use
of this Contract by Entities and potential Entities. The Contractor authorizes
the City and Gordian the use of the Contractor's name, logos, trademarks,
and Contractor provided materials in the presentation and promotion of the
availability and use of this Contract by Entities and potential Entities.
9.4. The City and Gordian shall not be liable or responsible for any obligation,
including, but not limited to, payments due under a Job Order, Purchase
Order or similar purchasing document issued to the Contractor by the Entity
("Purchase Order").
Remittance of License Fees: The Contractor shall remit License Fees as
follows:
ti
98 2019-257-KB
Payments Made Payable to: The Gordian Group, Inc.
Mail Checks to: The Gordian Group, Inc.
PO Box 79341
Baltimore, MD 21279-0341
9.5. The Contractor shall, within two (2) business days of receipt of a Purchase
Order from an Entity, provide notification to the City and Gordian of each
Purchase Order by forwarding a copy of the Purchase Order via email to
POc1 ezlQC.com or via facsimile to (864) 233- 9100.
9.6. The Contractor shall, within two (2) business days of sending an invoice to
an Entity, provide notification to the City and Gordian of each invoice by
forwarding a copy of the invoice via email to Invoice(a�ezIQC.com or via
facsimile to (864) 233-9100.
9.7. The City and Gordian may request records from the Contractor for all
cooperative purchasing through this Contract and payment of all License
Fees. The Contractor hereby agrees and authorizes the City and/or Entity to
provide a copy of each Purchase Order issued to Gordian. If discrepancies
exist between cooperative purchasing activity and License Fees paid, the
City or Gordian will provide written notification to the Contractor of
discrepancies and allow the Contractor ten (10) days from the date of
notification to resolve the discrepancy. In the event the Contractor does not
resolve the discrepancy to the satisfaction of the City and/or Gordian, the
City and/or Gordian reserve the right to engage a third party to conduct an
independent audit of the Contractor's records and, in the event Contractor is
not in compliance with this Contract, Contractor shall reimburse the
appropriate party for the cost and expense related to such audit.
10. THE CONSTRUCTION TASK CATALOG®
The Construction Task Catalog®is part of the Contract Documents and included by
reference. The Construction Task Catalog® is available as a separate PDF
document.
11. THE TECHNICAL SPECIFICATIONS
The Technical Specifications are part of the Contract Documents and included by
reference. The Technical Specifications are available as a separate PDF
document.
99 I 2019-257-KB
ATTACHMENT C
CONSULTANTS RESPONSE TO THE ITB
•
•e
FLORIDA DEPARTMENT of STATE] DIVISION OF CORPORATIONS
- _
_ ,. : •
Lif
DIVISION Of
.77?'"2100 ilg
CORPORATIONS
--,.=- - - - - .
an. official Stale of Florida website
..,_ ''''-,.:7-?, - -- - - --
Department of State / Division of Corporations / Search Records / Detail By Document Number /
_ , ..-. ,,,--,., ,,,----_,-,;,-p.,--,,,-"-`-7-_-. _'.':::-:'.'''.'-'-:'::',. :--.': ::::-.:If-2:1:::'-T''';f:",''':.: :::::;- -:-. YJ.;'-'-'_''_'-,:_-7-:7''1-'''''''' '-'''-:!*::•.:',-',.:':, ';,',...;:l'-_:''':,_.::-;''''' -:::-1',.'.1':.
P
k.2L.,tevibti§
_ On l'4§
.,'•.--:,':::--- . ';',7'.:-:-',';':;:', :i'' Next
.-:. --,6, -iiiJi:'-,:?-1-,fia6i6ztii,i(i4
,-: . ti,"- - -- = -,,,,,,,,,,,,,:-,,,,,,"",i:,",j,-,
reilii,2-,::::NrrieF-ii8o',1Y-- -,,,,: !,-:::','-,1
Detail by FEI/EIN Number
Florida Profit Corporation .
TEAM CONTRACTING, INC.
Filing Information
Document Number P00000041586
FEI/EIN Number 65-1002254
Date Filed 04/25/2000
State FL
Status , ACTIVE
Last Event AMENDMENT
Event Date Filed 03/24/2015
Event Effective Date NONE
Principal Address
13911 S.W.42ND STREET
SUITE 209
MIAMI, FL 33175 '
Changed: 05/24/2007
Mailing Address
13911 S.W.42ND STREET
SUITE 209
MIAMI, FL 33175
. ,
Changed: 05/24/2007
Registered Agent Name &Address
AYAN, RODOLF0 L
Hy.,.1';'., ,‘..,...,,..-El•cili<:::.•.-.L.. ..... - .'"(41:''' - "''''' : 2:''''''''''..-;":‘-'''''''fch!..---:.'"" '
1360 PELICAN AVE
NAPLES, FL 34102
Name Changed: 05/24/2007
Address Changed: 01/05/2012
Officer/Director Detail
Name&Address
Title VSTD
AYAN, RODOLFO L
. 1360 PELICAN AVE
NAPLES, FL 34102
Title PD
BATISTA, JULIO C
13911 SW 42nd Street
209
MIAMI, FL 33175
Title V
GELL, DANIEL A
13911 S.W.42ND STREET SUITE 209
MIAMI, FL 33175
Annual Reports
Report Year Filed Date
2017 01/09/2017
2018 02/19/2018
2019 02/07/2019
Document Images
02/07/2019—ANNUAL REPORT View image in PDF format
02/19/2018—ANNUAL REPORT View image in PDF format
01/09/2017—ANNUAL REPORT View image in PDF format
01/27/2016—ANNUAL REPORT View image in PDF format
03/24/2015—Amendment View image in PDF:format
01/09/2015—ANNUAL REPORT View image in PDF format
01/20/2014—ANNUAL REPORT View image in PDF format
01/25/2013—ANNUAL REPORT View image in PDF format
• :-..... rii %�.. .:So;:.5• ' ...`(1:`)...11i .l�f'�:° ,u i':�n.•J,i7i;i.2 '•�`i•=;ti ;'i:.' ..ai 71i....�... ...
01/05/2012—ANNUAL REPORT View image in PDF format
01/05/2011 —ANNUAL REPORT View image in PDF format
01/14/2010—ANNUAL REPORT View image in PDF format
01/16/2009—ANNUAL REPORT View image in PDF format
01/17/2008—ANNUAL REPORT View image in PDF format
11/09/2007—Amendment View image in PDF format
07/19/2007—Amendment View image in PDF format
05/24/2007—Amendment and Name Change View image in PDF format
01/09/2007—ANNUAL REPORT View image in PDF format
01/09/2006—ANNUAL REPORT View image in PDF format
01/06/2005—ANNUAL REPORT View image in PDF format
01/07/2004—ANNUAL REPORT View image in PDF format
03/03/2003—ANNUAL REPORT View image in PDF format
04/08/2002—ANNUAL REPORT View image in PDF format
04/05/2001 —ANNUAL REPORT View image in PDF format
04/25/2000—Domestic Profit View image in PDF format
• "
Previous On List Next On List Return to List
Events Name History
Florida Department of State,Division of Corporations
.1'_�� ; %(fl ;i, . ;t. ':7.1i,,:,.._.,! €•ftr)13"!ltS': .. ..,
• TEAM
GD NTRA CT! N
TEAM CONTRACTING
General Contractors&Design Builders
COC 061511 •CGC 046372
SEALED BID
ITB NO.: 2019-257-KB
Job. Order Contracting (JOC) Services — Various Trades
City of Miami Beach
Procurement Department
1755 Meridian Ave., 3rd Floor
Miami, FL 33139
SUBMITTED BY:
Team Contracting, Inc.
Contact Person: Daniel A. Gell
Contact Number: 305-207-9799
June 19, 2019 @ 3:00 p.m.
T(305)207-9799. F(305)207-9790
13911 Southwest 42Street,Suite 209.Miami,FL 33175
TEAM
GD NTRA CTI N
TEAM CONTRACTING
General Contractors&Design Builders
CGC 061511 •CGC 046372
ITB NO.: 2019-257-KB
Job Order Contracting, (JOC) Services
General Construction
City of Miami Beach
Procurement Department
1755 Meridian Ave., 3rd Floor
Miami, FL 33139
SUBMITTED BY:
Team Contracting, Inc.
Contact Person: Daniel A. Gell
Contact Number: 305-207-9799
(
June 19, 2019 @3:00 p.m.
T(305)207-9799.F(305)207-9790
13911 Southwest 424 Street,Suite 209.Miami,FL 33175
TABLE OF CONTENTS
AB A_
ontractor Qualification Form (Appendix A)
ncludes Organizational Chart, Resumes &
.taffing Plan
AB B
inimum Qualifications and Submittal
i•equirements Includes GC Licenses,State of
I lorida Certificate of Status&Local Business
2 tax
.1 .ABC
:id Tender Form,Appendix B,,Form B1
'I AB D
cknowledgement of Addenda,Appendix B,
orm B2
4
Gn V)7
TABA .
„. •
miAmIBEAcH
APPENDIX A
miAmiBEAcH
Contractor
.
Qualification Form
FOR CONSTRUCTION PROJECTS
7.77 KlarBrtaingrepan IRMIE 031Di I
13 J 2019,257-KB
MIAN1IBEACH
Contractor Qualification Form Instructions
Section 1, Required Form. The Contractor Qualification Form is a required form that must be submitted,
completed and executed, with the bid,or within a days of request by the City. No bid will be considered without
the Contractor Form. Bidder's failure to submit this form as stipulated herein shall render its bid non-
responsive.
Section 2, Submittal Instructions.The Contractor Qualification Form will not be considered until it has been
submitted completed and executed by a principal Of the.applicant. Incomplete applications shall not be considered.
If requested information is not applicable, please.indicate "N/A" or"None;" If answers to questions are lengthier
than the spaces that are provided inthe application, the answers may be provided on additional pages, which must
be attached to the application. All requested documents must also be attached to the application. Failure to
attach all requested documents Will delay review and approval of the application.
The City reserves the right to request clarifications or additional information as deemed necessary to evaluate an
applicant's qualifications, When darilcafions or additional information is requested by the City,Applicants will have seven(7)
business days to provide,in full,all the requested information.Failure to provide the information within the prescribed
time will delay the reviewprocess and nyresultindenialofprequalification.
Part A—General Bidder Information.
FIRM NAME: •
Team Contracting,,Inc.
NO.OF YEARS IN BUSINESS: NO.OF YEARS IN BUSINESS NO.OF EMPLOYEES:
19 LOCALLY: 19 13
OTHER NAME(S)BIDDER HAS OPERATED UNDER IN THE LAST 10 YEARS: N/A
FIRM PRIMARY ADDRESS(HEADQUARTERS):
13911 SW.42nd Street,,Suite-209
CITY:
Miami.
STATE: FL ZIP CODE: 33175
TELEPHONE NO.:
305-207-9799
TOLL FREE NO.:
N/A
FAX NO.:
305=207-9790`
FIRM LOCAL ADDRESS:
13911 SW 42nd Street,Suite 209.
CITY:
Miami
STATE: ZIP CODE`
FL 33175
PRIMARY ACCOUNT REPRESENTATIVE FOR THIS ENGAGEMENT: Daniel Gell
ACCOUNT REP TELEPHONE NO.:
305-207-9799
ACCOUNT REP TOLL FREE NO.:
N/A
ACCOUNT REP EMAIL:
DGELL@TEAM-CONTRACTING.COM
FEDERAL TAX IDENTIFICATION NO.:
65-1002254
APPLICANT FIRM IS:
CORPORATION / PARTNERSHIP 1 _SOLE PROPRIETORSHIP !. OTHER(bother,spedfy.
14 12419-257-KB
MIAMI BEACH
15 I 2019-257-KB
MIAMI BEACH
Part B-Proposed Team.
1.Organizational Chart. Submit an organizational chart listing the proposed key personnel, their qualifications and
their roles in the project,resumes which shall include educational background,work experience,employment history,
and any other pertinent information. Where applicable, Bidder team members shall also submit current and valid
certifications and/or licenses for their individual scope of supervision. At a minimum, the bidder shall include the
following proposed project team members:
▪ Construction Project Manager
• Construction Superintendent
2. Staffing Plan. Submit a staffing plan that clearly illustrates the key elements of the proposed organizational
structure. The staffing plan should indicate the availability of the'personnel proposed to work on the Project. The
Staffing plan should also indicate the name of the individual who will serve as the primary contact.with.City.. Bidder
shall clearly detail the role of all sub-contractors proposed for the.Project.
Part C-Operational&Management Information.
1.Provide the names of each owner (stockholder, sole proprietor, and partner), director, or officer of the
company,below.Submit additional names on a separate sheet if required.
Owner Ownership percentage Directorship/Office type
Julio C.Batista 60% President.
Rodolfo L.Ayan 40% Vice President/Secretary
'2. Provide three(3)residential renovation projects thatthe applicant has completed in the:_last five(5)
years.
Project Description of Work Project Reference
City.of Miami Beach- Complete interior demolition fName: Sabrina Baglieri
London House Rehablitation &rebuild.Design-build. 6mai:SabrinaBaglieri@miamibeachfl.gov
Historic renovations.-. Telephone: 305-673-7071 ext.6709
Name: Mario Castellanos
Eureka Charter School Construction of new charter
Erna: castegroup@aol.com
school.Over 50,000 s/f.
Telephone: CharterVenture Eureka,LLC.
Ashley Plaza-Accessibility ADA compliant alterations to Name: Miguel Hernandez.
Interior&Exterior 10 residential units.Scope Email:Miguel:Hernandez@hialeahhousing.org
Improvements also included exterior ADA Telephone: 305-888-9744 ext. 1028
improvements.
3. Has the applicant company's construction licenses)been revoked during the last five(5)years?
YES NO
If yes,why?
16 I 2019-257-KB
MIAMIBEACH
4. Have any owners, directors, officers, or agents of the applicant company had a license revoked
during the last five(5)years?
YES I NO
If yes,why?
5..Is the applicant company currently barred by a governmental agency, from bidding work as a.prime or
subcontractor?
YES NO.
If yes,state debarment period and the reason(s)for debarment?
6. Has a surety completed, or paid for completion, of a project on behalf of the applicant company,
within the last five(5)years?
YES NQ'
If yes,why?
7. Has the applicant company or any of its owners, directors, officers, or agents been convicted of a
crime or had a claim that was filed in a court and mediated or arbitrated during the last five (5)years?
' YES NO
If yes,why?
8.. Is an affiliate of the applicant company prequalified by the City of Miami Beach to bid on construction
work?
YES VI NO
If yes,state the name of the affiliate?
17 I 2019-257-KB
MIAMIBEACH
9. Is the applicant company a parent, subsidiary, or holding company for another construction
company?
YES 191 NO
If the answer is"yes,identify the company and type of relationship(s),below:
Company Type of affiliation(parent or subsidiary) Period of affiliation
10. Is an owner,director,officer,or agent of the applicant companyaffiliated with another company?
N\i/ YES I I NO
If the answer is"yes,"provide the following information for each individual and the affiliated company.
Individual's name Affiliated company's name Period of Type of affiliation(e.g.
affiliation officer,.director,owner or
employee):
Julio C.Batista F&L Construction,Inc. 32 years Owner
11. Is the applicant company currently the debtor in a bankruptcy case or file for bankruptcy during the last
five(5)years?
YES ,f NO -
If yes,explain and attach,as applicable, the relevant case and court documents,including(but not limited to):the
original petition,including the case number and the date that the petition was filed;. a copy of the bankruptcy
court's discharge order, and any other document that ended the case, if no discharge order was issued,
12. Has any.owner, director, officer, or agent for the applicant company, or has any business
organization in' which any such person was an owner, director, officer, or agent filed for or been
discharged in bankruptcy within the past five(5) ears?
YESgrA N0
If yes,explain and attach a copy of the discharge order, order confirming plan and if a Corporate Chapter 7 case,a
copy of the notice of commencement.
13. Has any owner,director, officer, or agent of the applicant company owned or managed a construction
company under any other name in the last five(5)years?
18 I 2019-257-KB
MIAMI BEACH
Rri YES NO
If yes,explain.
F&L Construction,Inc.is a company that was owned by Julio C.Batista's father.
14. Has the applicant company been assessed or paid liquidated damages on any project during the past
five(5)years,whether the project was publicly or privately owned?
YES I // NO
If yes,explain.
15. Are there currently-any liens, suits, or judgments of record pending against any owner;, director,
officer,or agent for the companythat is related to construction activities of a business organization?
{ YES , w`/ NO
If yes,explain.
16. Has the applicant company'or any of its owners,officers, or partners.ever been convicted (criminal)
or found liable (civil) for making either a false claim or material misrepresentation to any public agency
or entity? No.
If yes,explain.
17. Has the applicant company or any of its owners, officers, or partners ever been convicted of
any a federal or state crime?
YES NO
If yes,explain.
18. Is any officer, director, employee or agent, or immediate family member (spouse, parent, sibling, and
child)of any officer,director,employee or agent,ane slope of the City of Miami Beach?
YES IINO
19 l 2019-257-KB
MIAMI BEACH
If yes,state name,title and share of ownership
Name Title Share(%)of Ownership
19. Has the applicant,or any officer,director,employee or agent,contributed to the campaign either directly
or indirectly, of a candidate who has been elected to the Office of Mayor or City Commissioner for the
City of Miami Beach?
YES n NO
If yes,provide details.
20. Pursuant to City Resolution No:2000.23879,each person or entity that seeks to do business with the City
shall adopt a Code of Business Ethics ("Code"). Does the applicant maintain a corporate code of
business ethics?
YES VI NO
21a. If yes, attach. Ifs no,.will the applicant accept the City's code of ethics•(available atavailable at
http l/www.miamibeachfl.govlcit -halllprocurementlprocurement-related.ordinance-and-procedures)?
I-V YES 1-1 NO
Applicant will accept the City's code of ethics
21. Pursuant to City Ordinance No.2016-3990,the City shall not enter into a contract with a business unless
the business represents that it does not and will not engage in a boycott as defined in Section 2-375(a)
of the City Code, including the blacklisting, divesting from,or otherwise refusing to deal with a person
or entity when such action is based on race, color, national origin, religion,sex, intersexuality, gender
identity, sexual orientation, marital or familial status, age or disability. Does the applicant agree to be
comply with this'prohibition?
641 YES NO
22. Is the applicant a small business concern owned and controlled by a veteran(s)(certified by the.State of
Florida Department of Management Servicesor a service-disabled veteran business enterprise(certified
by the United States Department of Veterans Affairs).
YES \I NO
Certifying Agency . Certification Type
23.Equal Benefits for Employees with Spouses and Employees with Domestic Partners. Purchases hereunder
are subject to the requirements of Equal Benefits for Domestic Partners Ordinance 2005-3494 that requires suppliers
with more than 51 employees and City volume greater than$100,000 to provide"Equal Benefits"to their employees
with domestic partners, as they provide to employees with spouses. The Ordinance applies to all employees of a
supplier who works within the City limits of the City of Miami Beach, Florida; and.the Contractor's employees located.
20 I 2019-257-KB
MIAMI BEACH
in the United States, but outside of the City of Miami Beach limits, who are directly performing work on the contract
within the City of Miami Beach.
A. Does the applicant provide or offer access to any benefits to employees with spouses or to spouses of
employees?
YES NO
N/A B. Does your company provide or offer access to any benefits to employees with(same or opposite sex)domestic
partners'or to domestic partners of employees?
YES NO
C. Please check all benefits that apply to your answers above and list in,the "other"section any additional benefits not
already specified. Note:some benefits are provided to employees because they have a.spouse or domesticpartner,
such as bereavement leave;other benefits are provided directly to the spouse or domestic partner, such as medical
insurance:
BENEFIT Firm Provides for Firm Provides for Firm does not
Employees with Employees with Provide Benefit
Spouses, Domestic Partners
Health
Sick Leave
Family Medical Leave
Bereavement Leave
•
24. Moratorium on Travel to and the Purchase of Goods or Services from North Carolina and Mississippi.
Pursuant to Resolution.2016-29375, the City of Miami Beach, Florida prohibits the purchase of goods or services
sourced in North Carolina, and Mississippi. Are any of the products for which the applicant is seeking to be.
prequalifiedsourced in North Carolina or Mississippi?
YES I NO
if yes,explain.
25. Non-Discrimination. Pursuant to City Ordinance No.2016-3990, the City shall not enter into'a contract with a
business unless the business represents that it does not and will not engage in a boycott as defined,in Section 2-
375(a)of the City Code, including the blacklisting,divesting from,or"otherwise refusing to deal with a person or entity
when such action is based on race, color, national origin, religion, sex, intersexuality, gender identity, sexual
orientation,marital or familial status,age or disability.
SUBMITTAL REQUIREMENT: No additional submittal is required. By virtue of executing this affidavit document,
Proposer agrees it is and shall remain in full compliance with Section 2-375 of the City of Miami Beach City Code..
26.Fair Chance Requirement.Pursuant to Section 2-376 of the City Code,the City shall not enter into any contract
resulting from a competitive solicitation, unless the proposer certifies in writing that the business has adopted and
employs written policies,practices,and standards that are consistent with the City's Fair Chance Ordinance,set forth
in Article V of Chapter 62 of the City Code("Fair Chance Ordinance"), and,which, among other things, (i) prohibits
City contractors, as an employer, from inquiring about an applicant's criminal history until the applicant is given a
conditional offer of employment; (ii)prohibits advertising of employment positions with a statement that an indiyidual
21 I 2019-257-KB
•
MIAMIBEACH
with a criminal record may not apply for the position, and (iii) prohibits placing a statement on an employment
application that a person with a criminal record may not apply for the position:.
SUBMITTAL REQUIREMENT: No additional submittal is required at this time. By virtue of executing this affidavit,
Proposer certifies that it has adopted policies, practices and standards consistent with the. City's Fair Chance
Ordinance. Proposer agrees to provide the City with supporting documentation evidencing its compliance upon
request. Proposer further agrees that any breach of the representations made herein shall constitute a material
breach of contract,and shall entitle.the City to the immediate termination for cause of the Contract,in addition to any
damages that may be available at law and in equity.
CONTRACTOR QUALIFICATION FORM AFFIDAVIT
The undersigned agrees that s/he: 1)is a,principal of the applicant duly authorized to execute the.foregoing
Contractor Prequalification Certification Application, and that the contents of said documents) are
complete, true, and correct to the best of his/her knowledge and:belief;:2) s/certifies that the application
and supporting documents include all of the material information necessary to validate the status of the
company for prequalification purposes; 3) s/shall notify the Procurement.Department within fifteen (15)
days and provide a notarized statement whenever a change occurs in the ownership, management,.or
financial condition of the company. Further, any prequalification applicant, including its principal(s),
director(s), and any affiliate, who is a party to any misrepresentation to obtain business or contracts with
the City of Miami Beach shall be declared delinquent and have its certificate suspended or revoked and
will be subject to debarment and any other penalties prescribed by law.
The undersigned affirms that the applicant agrees: 1) to complete and unconditional acceptance of the
terms and conditions of thisdocument, inclusive of attachments,,exhibits and appendices and the contents
of any Addenda released hereto;2)that it has not colluded, nor will collude,with any other applicant;3)that
all information contained herein is part of the public domain as defined by the State of Florida Sunshine and
Public Records Laws;'4) that all responses, data and information contained in the proposal are true and
accurate.
Name: Title(must be a principal of the:applicant):
Da 1 Gell Vice.President
Signature:: c � Date:
June.14,2019
22 I 2019-257-KB
TEAM
CONTRACTING
TEAM CONTRACTING
General Contractors 8c Design Builders
CGC 06151 I .CGC 046372
GENERAL CONTRACTOR TEAM ORGANIZATIONAL CHART
Rodolfo L. Ayan
Executive Vice President
CMB JOC Contract Manager
Daniel A. Gell Julio Batista
Mario Lopez
Vice President/Sr. Project President
Manager Project Management Superintendent
Wilfredo Gonzalez Lissette C. Gell Jorge Hernandez
Site Foreman Administrative Site Foreman
Assistant/Bookkeeper
•
T(305)207-9799. F(305)207-9790
13911 Southwest 42"Street,Suite 209.Miami,FL 33175
Julio C. Batista
PILSIDENT
_
Julio C. Batista is currently the President of Team Contracting, Inc, He is a State of Florida Certified
General Contractor with over 28 years of construction and design-build experience. He has overseen
over 300 projects with a total worth of over-$200 million for local government entities.
Rey Skills
—Construction/Demolition Projects —Site,Safety/OSHA —Budgeting&Cost Controls
—Infrastructure Improvement Compliance —Bidding/Estimating/Proposals
Projects —QA/QC/Field Engineering —Subcontractor/Crew
—Historical Renovation Projects —Design-Build Projects Supervision,
Employer SUMMON
TEAM CONTRACTING, INC. (MIAMI, FL) — Pres./Construction Project Manager. January 2007 to Present
Oversees day to day operations. Manages the Job Ordee Contracting division.
F&L CONSTRUCTION, INC. (Miami, FL) —_Pres./Constiuction Project Manager,July 1987 to December
2006
Oversaw day to day operations. Managed Job Order Contracting,division.
Relevant ExPerience
1miinifotlaatothity.,*460(*arit'c1998*),Pee: 66*,,,* siiA6ost*imtp,0911,
• Eureka Charter School r- New Design-Build educational facility. $6.0M,
• London House Rehabilitation - Design-Build Historic Housing Renovation. $3.7M
• Homestead Charter School - New Design-Build educational facility. $3.0M
• Carlos Albizu University-Design-Build Ground Floor Expansion. $1.3M
• David Lawrence K-8- New design-build K-8 educational facility. $18M
• Hialeah Elem.-Additions&Renovations- New design-build addition and renovations to existing
educational facility. VIM
• State School"C"- New Elementary educational facility site development, $11.3M
• State School"A"-New Elementary educational facility site development $9.6M
• State School"C"- New Elementary educational facility site development $$11.3M
• State School"LL"- New design-build educational facility. $13M
• State School"EE"-New design-build Middle Learning Center. $5M
• The Sail COndorninium - New 37 story condominium. $19M
• Please note: Over 100 additional projetts available upon request
ElhigatION &Certifications
FLORIDA INTERNATIONAL UNIVERSITY (Miami,.FL) —Associates in Arts, 1982
State of Florida Certified General Contractor CGC 046372
Rodolfo Lo Ayan
VICE .PREStIDENT°
Rodolfo Ayan is currently the Vice President and founder of Team Contracting,Inc.. He is a State of Florida Certified
General Contractor with over 18 years of constructionand design-build experience. He has overseen over 500 projects
for local government entities.
Key Skills
—Construction/Demolition Projects —Bridge Restoration Projects —Budgeting&Cost Controls
—Infrastructure Improvement Projects —al/QC/Field Engineering —Bidding/Estimating/Proposals.'
—Historicaf Renovation Projects —Design-Build'Projects —Subcontractor/Crew Supervision
Employer Summary
TEAM CONTRACTING.INC.(MIAMI,FL)—V.P./Construction Project Manager,January 2007 to Present
Oversees day to day operations. Manages the Job Order Contracting division.
F&L CONSTRUCTION.INC.(Miami,FL)—V.P./Construction Project Manager,November 1992 to December 2006.
Oversaw day to day operations: Managed Job Order Contracting division.
Relevant Projects
.i,City of:Miami Beach J.0 C"(2004to 2013).o Budgets:$200k to$3M
• Convention-Center Dr.Bridge Repairs-Structural repairs to existing bridge including above deck and under deck repairs.$610k
• Washington Ave:Bridge Repairs-Structural repairs to existing bridge including above deck and under deck repairs.$555k
• 77th Street Bridge Repairs-Structural repairs to existing bridge including above deck and under deck repairs.$511k
• 17th Street Bridge Repairs-Structural repairs to existing bridge including above deck and under deck repairs.$599k
• Surface Lot 8E Renovations-Demo existing lot,new paving,drainage,site lighting,site work,Irrigation and landscaping.$390k
• Surface Lot SC Renovations-Demo existing lot,new paving,drainage;site lighting,site work,Irrigation and landscaping.$994k
• Flagler Monument Island Restoration-Restoration of hittoricatmonument and sdrroundings.$971k
• Surface.Lot'26A Renovations-Demo existing lot,new paving,drainage,site lighting,site work,irrigation and landscaping..
$682k
City of Miami J.O.C: (2Q03 to 2009) o.Budgets:$500kto$5.5M 1
• Fern Isle Park-Construction of new park. Project included new concession building,site drainage,site water&sewer;parking
lots,site lighting,irrigation,landscaping.$5.SM
• Gibson Park Improvements-New multi-purpose building,new food prep building,site improvements.$1.3M
IMiami=Dade;CountyPublicSchoolslJ.O:C.:(1999bto2008)ae'Budgets:$10K:to$2M'
• Multiple contracts throughout this period. Over 100 projects varying in scope and size.Over$15M
IMiami-Dade.County.public Schools (2000 to:2008) •,Budgets:'$2M to$16M
• David Lawrence K-8-New design-build.K-8 educational facility site development.$18M
• Hialeah Elem.-Additions&Renovations-New design-build addition and renovations to existing educational facility.$4M
• State School"C"-New Elementary educational facility site development.$11.3M
• State School"A"-New Elementary educational facility site development.$9.6M
Education & Certifications
FLORIDA INTERNATIONAL UNIVERSITY(Miami,FL)—BS in Criminal Justice,1992
State of Florida Certified General Contractor-CGC 061511
EPA Lead Certified Renovator
Daniel Gell
R..
PROJECT 1111011111Gin
Daniel Gell has over twelve years'experiencein all aspects of construction. He has overseen Over$15
million worth of contracts in concrete sidewalk/curbing construction throughout several South Florida
municipalities. Most recently hehas overseen the Job Order. Contracting division for Team Contracting.
Key Ski9Is
— Construction/Demolition Projects —Site Safety/OSHA Compliance — Budgeting& Cost Controls
—Infrastructure Improvement Projects — QA/QC/Field Engineering —Bidding/Estimating/Proposals
—Historical Renovation Projects —Sidewalk/Curbing Projects _Subcontractor/Crew Supervision
Daphne'Summary
TEAM CONTRACTING; INC. (MIAMI, FL) —Construction Project Manager, 01/07 to Present
Manages the Job Order Contracting division.
F&L CONSTRUCTION, INC. (Miami; FL) — Construction Project Manager/Superintendent, 08/00 to 12/06
Oversaw the sidewalk division for F & L Construction. (08/00 to 06/04) and was in charge of four separate
concrete crews. Project Manager for the Job Order Contracting division.
Project Highlights
Miami_Beach 3 0:C. (2004 to°2013)• o Budgets $20.0l(to$1M'
• Pump Station#19 Improvements-Demo existing parking, install concrete pavers,new landscaping and
irrigation
• Pump Station #28 Improvements Demo asphalt, provide new drainage, new parking lane,striping,
signage, landscaping, electrical, pavers and irrigation
• Pump Station #15 Improvements-New ADA ramp, curbing, landscaping and irrigation
• Lummus Park Serpentine Sidewalk- Demo portions of existing.20'widesidewalk from 5th street to 14th
street and replace with 20'wide fiber mesh reinforced concrete walkways
City,of;Miami 7.O;c ;,(2003'to-2009),s's:,.Budgets:'$50.Ok to''3M
• Gibson Park Improvements- New multi-purpose building, new food prep building;site improvements
• West End Park-Renovations-Renovate existing pool/bath building including complete new roof, interior
demolition,addition of new ADA entrance ramp and interior-improvements
EConcrete,.Sidewalk/Curbing Contracts,:(2000.to Present) • 1Budgets:'$300K to VM
• Multiple contracts throughout this.period. Over 20 projects varying in scope_and size.
10t1",of Miami Beach Miscellaneous Projects(2013'to Present),.•'Budgets:$10Ok to$4M
• Surface Lots 12X&17X-Demo existing surface lots and construct new
• London House Rehabilitation-Design.Build Historic Renovation Housing Project
• Ocean Drive.Paver Crosswalks-'Installation of paver crosswalks on Ocean Dr.
• Washington Ave. Paver Crosswalks- Installation of paver crosswalks on Washington Ave.
Education a Certifications
MIAMI-DADE COMMUNITY COLLEGE (Miami, FL) —Associate in Arts
STATE OF FLORIDA CERTIFIED GENERAL CONTRACTOR- CGC 1518613
Li"7._e3d Cc'r(if1'::il 1 =l0`JBtL, El-'A Lead
TEAM
•
C O NIRA CTI N
TEAM CONTRACTING'
General Contractors&Design Builders
CGC 061511 CGC 046372
STAFFING PLAN
Our staff as identified in our organizational chartis all available for immediate work for
this project. We currently havenurtured and maintained a pre-qualified subcontractor
base that is availableto work at a moment's notice. Our subcontractors enhance our
existing workforce and provide specialty trades work.
'Our staff is extremely familiar with JOC contracts,having performed work for several
different agencies under the JOC program., Our main goal has:alwaysbeen to serve our
client's needs.
The contact person for this contract will be:Rodolfo L.Ayan, Vice President/Project.
Manager..
T(305)207 9799.F(305)207-9790
13911 Southwest 42nd Street,Suite 209. Miami,FL 33175
EG,' `'9i]L . Cif9'2 1 P.•2flov2Lt
• TABB
- ,
RICK SCOTT,GOVERNOR JONATHAN ZACHEM,SECRETARY d Florida
-4,‘,4,-.3',---- ' -f-,
•
, -,, ,
r.
..:,
... rr
.- .
,- .Tu•-•:. "-';_i,,t,,--•.. ,
k
%IWO,
STATE OF FLORIDA
DEPARTMENT OF BUSINESS- AN--_,P---PRQFESSIONAL REGULATION
,
,-._,.., . -nr:17,..,i 1.1-41 . ,„,---,-- -,,_
.-:;,--,,-- 0 Jc----, ,.....)._,0
T"
CONSTRUCTION1HDUS4TRICENSING BOARD
,47 .,-,,,er--47-----::
THE GENERAL NCOLTA 'RC., ,,0 R,H, E,RIELISCERTIIEI,EUNDER THE
`-- ,T)-7,-, .,„.,7-- -.„.rtr
PROVISIONkafitliA-7-:-15„feRg8KO
9712-- R-L. AS. TATUTES
if t-`4 ite2:._Pv,,...,--;-:-----,—_,-,-
Pi
1 I AV "WAGIX),EFOJEtqll_4'EINIZz,. .04
'
1 1° 4 t;--..,•;;,..4..-f- fil'0.44417;0:W.,.,,---.,,- -:`;=. "---... . "'"--,-...,..f.--... --_„,,u1
f il g- fil :'.A _, ___.-1•-7-7701A Wilrf:=:,tecir';'' ---I'rza4=---1---;—%t-77-2f..----774JE,--::
kWE6 kli se-D- 0-3:-14:C-Ti: VP' IN-- ------v-74?-,--.'
I} C'. bVili bfAJA itfgart-IST*EFte-SUITE-293., ?If
1 , t.4ii
..,) \ v.,---__....„, s4,4--:.M1Pci\I I *-4. .,- tr",:---,-; s-,,a' -1-%,;•-t--!,,::' c i
,/?
> *
-, •IL---
....„..........,,T:,---....a: .....
ildtksE,,NO- MBER-:-CA:d06,itli
-,,,,,4 ro r‘.... — .k. - ---,--
.--
EXPIRATtOMDATELAU.GUST 31, 2020
Always verify licenses online at MyFloridaLicense.com
•.4
•r: • '-. ...7.gri; Do not alter this document in any form.
xt,
-0.•:•::
This is your license. It is unlawful for anyone other than the licensee to use this document.
,1 • c.
1. • - •
d .
-Fri . ..t.,--
RICK SCOT!,.GOVERNOR
I:; JONATHAN ZACHEM,SECRETARY
_* 1 Florida
, r
,./v,‘„,,,,, ....N, .
a..,.,...,..v14,7..,„.., .:,:,...,:.G'
,
STATE OF FLORIDA
'' •
DEPARTMENT OF BUSINESS ANDTPROFESSIONAL REGULATION
Y" t �� I; .r r ,
!i. CONSTRUCTION �NDUSTR LICE
NSING BOARD
t.. .
,....-",A,‘—^.—::–.7:-77:-%-1,(;;;,75:,
I TTHE GENE LCO 7N'TRA ii. HIERT••IS CER1 lFIEDUNDER THE.
11 ,,r ` ----.m•', bY'X :;916title:: '""�:.a+ -;,0,,,:c7:1--1.
I ivPROVISION aCF'=F_A ,TE _9 _WR`IDA�STA- �4UTES,
pq 6.14p.,---"---1,-:,:-.'-'74,-.41-__;-,;'( --',,,,f.-7.,----'4V.--7,•, ,.(.:,-t-,-14. ,_ ;�.�
III
A - T CONT T1N 1 t 111E --''j -
t--- i
1 9v VA:*
r240-$':TrSU111E 0 � P ''
[f ,,mss n, •,..t Th1(, r
,�MIA.,�N11,_j. �, EL>3�3175 , '
• :.1,-.:%‘7,��''.',' I'� .s �lu'' 44,E "1"k� ¢`1 r'
1 EL C
iteENS � Ui�A�ER�CG'C1 22628
EXPIRATION=-DAT_ E. AJCJST 312 2020
I Always verify licenses online at MyFloridaLicense.com
jE - . ❑
E; fti� l• .'••'., Do not alter this document in any form,
n
• ;o . This is your license. It is unlawful for anyone other than the licensee to use this document.
I l'. -
:R
-.,
State if Florida '
Department of State
I certify from the records of this office that TEAM CONTRACTING, INC. is a
corporation organized under the laws of the State of Florida, filed on April 25,
2000.
The document number of this corporation is PO0000041586.
I further certify that said corporation has paid all fees due this office th:ough
December 31, 2019, that its most recent annual report/uniform business report
was filed on February 7,2019, and that its status is active.
I further certify that said corporation has not filed Articles of Dissolution.
Given under nay hand and the
avid Seal of the State of Florida
at Tallahassee,the Capital,this
the Seventh day of Febtwary,2019
. .......
Secretary of State
. ....
Tracking Number:0890801453CC
To authenticate this certificate,visit the following site,enter this number,and then
follow the instmtions displayed.
littps://services.sunbiz.org/Filings/Certificate0fStatus/CertificateAuthentication
..... , ‘r....4-,,,t.wa,...........4...--.%tc...a.--.; ...,1)t. .........,sc., . M.Z .- ...,..e:...,,,--.iis -,....—, -:.t,'51....A.Z.,..... 4...,..
--.-—----------
001742
•
Local Business Tax Receipt
Miami-Dade County, State of Florida
-THIS IS NOTA BILL-DO NOT PAY' ID ey
6077036
ROSINESSNAMEILOCATION RECEIPT NO. EXPIRES
TEAM CONTRACTING INC RENEWAL SEPTEMBER 30,2019
13911 [MORD 209 6339378 Must be displayed at place.of business
MIAMI FL 33175 Pursuant to County Code
Chapter BA-Art.9&10
muse SEC.TYPE OF BUSINESS PAYMENTOtCENEO
TEAM CONTRACTING INC • 196 GENERAL BUILDING CONTRACTOR BYTAX COLLECTOR
C/0 RODOLFO LORENZO AYAN QUALIFIER . CGC061511.. --- $75:00 07113/2018
Worker(s) 6 CHECK21-18-068465
This Local Business Tait Receipt delYdonflims payment of the Local Rosiness Tax.The Receipt is not alieanse, - .
permit,or a certllication el the holder's qualifications,as do business:Holder must coinply.wilh any governmental
or nongouornmental.regaletory laws and'roi ufiemenls which apply to the business.
The RECEIPT.NO.above most lio`displayed on all commercial vehicles-Miami=Dade Code Sec 8a-27G.
For more information,visit www.miamidade.govltaxoolleotor
•
•
•
• •
•
•
.Pstmte,41... ,
MIAMI BEACH
Bid Tender Form (B1)
Page 1 of 1
FAILURE TO SUBMIT THIS BID TENDER FORM"FOLLY'COMPLETED AND EXECUTED ON OR BEFORE THE
DUE DATE 'FOR BIDS SHALL RENDER `THE BID NON-RESPONSIVE AND BIDDER SHALL RECEIVE NO
FURTHER CONSIDERATION.
The TOTAL BASE BID amount includes the all-inclusive total cost for the work specified in this bid, consisting of
furnishing all materials, labor, equipment, shoring, supervision, mobilization, demobilization, overhead and profit,
insurance,permits,and taxes to complete the work to the full intent as shown or indicated in the contract documents.
In the event of arithmetical errors,the Bidder agrees that the Adjustment Factors listed in the column titled"Bid
Adjustment Factor"shall govern and be used to calculate the division totals and total base bid. In absence of either
of the two(2)Adjustment Factors,the City shall interpret as no bid,which may disqualify bidder..
In the table below,the Bidder shall set forth Adjustment Factors in legible`figures in the respective space provided.
The Contractor shall perform the Tasks required by each individual Job Order using the following Adjustment
Factors:
Adjustment Factor Name .Bid Adjustment Factor .X Multiplier '=Division`Totaf:
Adjustment Factor for Normal Working II ll
1' Hours 1 Q X 0.80 = Q. 1
•
2.,': Adjustment Factor for Other Than t t A X 0.20 =a. Z 0
Normal Working Hours +` 1 —
3. ,Add all the Total amounts in the right column.
- The Sum of these Total amounts is the Total Base Bid, 0 2,.3
Notes To Bidder:
1. Specify lines 1 through 3 to four(4) decimal places. Use conventional rounding methodology (i.e., if the
number in the 5th decimal place is 0.4,the number in the 4th decimal remains unchanged; if the number in
the 5th decimal place is 5-9,the number in the 4th decimal is rounded upward).
2. The Other Than Normal Working Hours Adjustment.Factors must be greater than..or equal to the.
Normal Working Hours Adjustment Factors.,
3. The weighted percentage multipliers above are for the purpose of calculating a Total Base Bid only. No
assurances are made,by the City that Work will be ordered under the Contract in a distribution consistent
with the weighted percentages above. The Total Base.Bid is only used for the purpose of determining the
Bid.
4. When submitting Job Order Price Proposals related to specific Job Orders, the Bidder shall utilize one or
more of the Adjustment Factors applicable to the Work being performed.
24 I 2019-257-KB
Bidder's Affirmation
The undersigned, as Bidder, declares that the only persons interested in this Bid are named herein; that no other
person has any interest in this Bid or in the Contract to which this Bid pertains; that this Bid is made without
connection or arrangement with any other person; and thatthis Bid is in every respect fair and'made in good faith,
without collusion or fraud. The Bidder agrees, if its Bid is accepted, to execute an appropriate City of Miami'Beach
document for the purpose of establishing a formal contractual relationship between the Bidder and the City of Miami
Beach,Florida,for the performance of all requirements to which the Bid pertains.
Bidder: Team Contracting,Inc.
Authorized Agent Name: Daniel Gell
Authorized Agent Title: Vice resident
Authorized Agent Signature: kVA
L
25 I 2019-257-KB
•
TAB
•
•
•
Acknowledgement of Addenda (B2)
Page 1 of 1
ix•, ;i a ;\t, r.• f
I e0
Amendment 1 1111,11 .11 Amendment.6
Amendment 2 Amendment 7
Ma 21 2019
Amendment 3 Amendment 8
Amendment 4 11111R1RIMIIIII Amendment 9
Amendment 5 Amendment 10