RESOLUTION 93-20852 RESOLUTION NO. 93-20852
A RESOLUTION OF THE CITY COMMISSION OF THE
CITY OF MIAMI BEACH, FLORIDA, AUTHORIZING THE
MAYOR AND THE CITY MANAGER TO ENTER INTO AN
AGREEMENT WITH KPMG PEAT MARWICK FOR THE
PURPOSE OF A FEASIBILITY STUDY OF THE 10TH
STREET AUDITORIUM.
WHEREAS, the City of Miami Beach wishes to utilize the
services of KPMG Peat Marwick, for the purposes of conducting a
Feasibility Study of the 10th Street Auditorium located at 1001
Ocean Drive; and,
WHEREAS, the parties have negotiated a fee for these services
of $35, 000.
NOW, THEREFORE, BE IT DULY RESOLVED BY THE CITY COMMISSION OF
THE CITY OF MIAMI BEACH, FLORIDA, that the City Manager is
authorized to enter into a Letter of Agreement with KPMG Peat
Marwick to perform a Feasibility Study of the 10th Street
Auditorium located at 1001 Ocean Drive, for the fixed fee of
$35, 000.
PASSED and ADOPTED this 14th day of ,,, July , 1993 .
•
ATTEST:
City Clerk IM- .4•171/
MDB:ah
FORM AP"ROVED
LEG9PT. ,-
BY Vela ffr
Date
CITY OF MIAMI BEACH
CITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH FLORIDA 33139
OFFICE OF THE CITY MANAGER TELEPHONE: (305) 673-7010
FAX: (305) 673-7782
COMMISSION MEMORANDUM NO. 3a,--9 3
TO: Mayor Seymour Gelber and DATE: July 14 , 1993
Members of the City Commission
FROM: Roger M. Carlt0
City Manager
SUBJECT: ART DECO HISTORIC DISTRICT CONFERENCE CENTER FEASIBILITY
STUDY — RECOMMENDATION FOR AWARD
ADMINISTRATION RECOMMENDATION:
It is recommended that the City Commission award the Feasibility
Study contract to the recommended firm of KPMG Peat Marwick.
BACKGROUND:
On April 13 , 1993 , the City of Miami Beach issued RFP No. 42-9293
calling for proposals of a Historic Conference Center Feasibility
Study. Five (5) proposals were received. The City Manager
subsequently appointed a selection. committee to review and narrow
down the list. The Selection Committee received copies of each
proposal and were requested to evaluate each proposal for
compliance with submission requirements, documentation of
qualifications, experience and capability to provide the necessary
services for this agreement.
The selection committee met on June 7th and rank ordered the
proposals. Upon completion of the discussion, the firm of KPMG
Peat Marwick was ranked first. The City Commission approved
authorization to negotiate a contract with the above firm in the
Commission meeting of June 16, 1993 .
CONCLUSION:
The City Commission is requested to give the Administration
authority to award the contract to the number one ranked firm of
KPMG Peat Marwick. The total cost of the study is $35, 000. A
grant application in the amount of $1, 500, 000 has been submitted to
the Economic Development Administration for construction of the
facility.
RMC:MDB:ah
•
AGENDAG
ITEM
DATE / q_ c?3
r sl t
Peat Marwick
•
Management Consultants
Barnett Tower,Suite 1600 Telephone 813 822 8521 • ' Telefax 813 822 7003
One Progress Plaza
St. Petersburg, FL 33701
July 9, 1993
Ms. Mayra Diaz-Buttacavoli
Assistant City Manager
City of Miami Beach
1700 Convention Center Drive
Miami Beach, Florida 33139
Dear Ms. Diaz-Buttacavoli:
On behalf of KPMG Peat Marwick and its Hospitality Consulting Group and the Orlando based
conference center programming firm of ZHA International, Inc., we are pleased to submit this
revised proposal for consulting services.
OUR UNDERSTANDING OF THE ASSIGNMENT
Our team understands that the City of Miami Beach is seeking assistance in determining the
feasibility of a conference center in the Ocean Drive area that would support forty hotel
properties containing nearly 2,200 rooms.
Due to the lack of meeting and dining space, most of these hotels are precluded from booking
any significant group business. Preliminary interviews by the City and hotel operators in the
district, indicate that some hotels have actually turned down business requiring meeting or
dining space for 100 or more people. The concept of a shared conference center within walking
distance of the hotels was greeted very favorably by hoteliers.
We also acknowledge that the City owns an existing community center located at 10th Street and
Ocean Drive which is currently under utilized. The facility has the potential to provide the
opportunity to meet the needs of the hotels in the Art Deco District. The City proposes to
determine if market demand exists to justify converting the community center into a conference
center, and whether the existing 11,000 square foot facility may successfully be modified to
meet the needs of the area. In addition, community groups have inquired as to the availability of
space in such a center. The Miami Beach Chamber of Commerce and the Miami Design
Preservation League have both expressed interest in the project.
With the above in mind, we have designed our scope of services to address the phases of work
outlined in your. Request for Proposal. While our final product is to be a written report, the
process will be interactive. This will enable you to provide input, develop a complete
understanding of the findings and will enable you to monitor the progress of the analysis.
EINE Member Firm of
Klynveld Peat Marwick Goerdeler
KPMG Peat Marwick
Ms. Mayra Diaz-Buttacavoli
July 9, 1993
Page 2 of 12
Our scope of services will assist you in determining the need for, and
the impact of, a conference center in the Art Deco District
Review Existing Data and Resources
2 Assess the Market Potential for a
Conference Center in South Beach
...
....
3
Estimate Event Demand
and Room Night Impact
Check-Point
Is Stop Study
Development No
Warranted Process
• .. Yes
4 Develop a Building
Program that
Addresses the
Market's Neefr
ds
•
5
7 Evaluate Operational
Evaluate the
Characteristics of the
Proposed Site
Project
........
.......
.•:••••••• •
•
6 Q
Estimate the 8 - Estimate the
Estimate Operating
Development Cost& Project's Impact
Revenues and Expenses
Funding Requirements on Area Hotels
i
KPMG Peat Marwick
Ms. Mayra Diaz-Buttacavoli
July 9, 1993
Page 3 of 12
SCOPE OF SERVICES
STEP 1 - Review Existing Data and Resources
Upon selection and receipt of authorization to proceed, we will meet with appropriate client
representatives to:
• Develop direct lines of communication between the consulting team and the client
• Develop an understanding of background, history, and key issues
• Confirm goals and objectives of the study
• Review data you may have related to the project
• Identify appropriate contacts and resources necessary to ensure complete assessment
of issues and specific data
• Obtain information and data from client representatives and governmental agencies
As part of this initial step, we will interview the City of Miami Beach staff, the Art Deco Hotel
Association, the Miami Beach Hotel and Motel Association, the Greater Miami Convention and
Visitors Bureau, the Miami Beach City Center Citizens Advisory and Technical Committee,
Spectacor Management Group, Miami Beach Development Corporation, Ocean Drive
Association and others as appropriate.
STEP 2 - Assess the Market Potential for a Conference Center in the South Beach Area
The assessment of trends occurring in the potential demand sectors is a critical step in the
analytical process. Facility design, staffing, funding and the operations of a facility are tied to the
existing and future event needs that a facility is expected to accommodate. Consequently, we will
devote significant efforts in this stage of the engagement. Specifically, we will:
A. Analyze the characteristics of the small meetings market in Dade County —We
will analyze the characteristics of the small meeting market in Dade County,
specifically for the South Beach hotel market, utilizing information from the Greater
Miami Convention and Visitors Bureau, meeting planners, and hotel operators.
B. Assess the South Beach area hotel market and the potential impact of a
conference center —We will identify those hotels in the South Beach area which
would most likely utilize a centralized meeting facility. As part of our analysis, we
will evaluate the current market segmentation of these properties and determine their
• •
1411116
Peat Marwick
Ms. Mayra Diaz-Buttacavoli
July 9, 1993
Page 4 of 12
potential to attract small meeting business if a conference center is constructed.
Through interviews with hotel operators, we will estimate the number of room nights
that are lost due to limited or lack of meeting space in the respective properties. This
portion of the analysis will also evaluate the level of service and the amenities needed
in the proposed conference center to allow these hotels to compete successfully for
this business.
C. Survey the local user market —We will survey potential users to determine their
interest in utilizing the facility. The surveys will be directed at both small meeting
planners and hotel managers. The survey will be conducted via telephone interviews.
We have found that a focused interview procedure is more effective than mass
surveys which many firms have conducted. Fairly often, survey respondents know
nothing of the area, may not meet in the region and/or cannot physically be
accommodated by the proposed project. Consequently, a mass survey process can
lead to erroneous conclusions. By focusing the interview process we can explore, in
detail, why potential users may or may not utilize the proposed facility. Our findings
will outline the kind of groups that will utilize the facility and their attitudes and
comments regarding the facility and the market.
D. Analyze competitive and comparable facilities —We will utilize our extensive
database of facility information to determine the type of events that occur in other
facilities and how they might, or might not, work in this project. Our analysis will
include nearby hotels with conference facilities, other conference centers in the South
Florida area and comparable cities with historic districts and inventories of small
historic hotel properties. In addition, we will outline which of these cities, if any,
have developed a centralized meeting facility or similar concept shared by hotels with
limited or no meeting space; how booking conflicts are mitigated; and whether the
hotels share a centralized hotel reservation system which could be housed at the
facility. We have recently worked in South San Francisco, Charleston, SC;
Savannah, GA; and other similar cities that will provide a starting point for our
research.
E. Analyze community attributes —We will analyze community attributes, such as
hotel supply, access,restaurants, entertainment, local transportation and other
attributes to determine if the Area offers the required attributes that other successful
areas offer.
KPMG Peat Marwick
Ms. Mayra Diaz-Buttacavoli
July 9, 1993
Page 5 of 12
STEP 3 - Estimate Event Demand and Room Night Impact
Based upon the preceding analysis, we will have the necessary information to develop demand
projections for the facility. We will estimate potential demand in terms of square footage
requirements, number of events, event length, attendance, room block requirement and length of
stay by major event types, for a five (5) year period.
CHECK-POINT - If it is determined that there is not sufficient demand that would
warrant a conference center, we can stop the study process.
If it is determined that there is sufficient demand that would warrant
construction and/or renovation, we will proceed as follows.
STEP 4 - Develop a Facility Program that Addresses the Market's Needs
Based on the results of the market analysis, the consulting team will develop a facility program
that can address the needs of the target markets identified. Both KPMG Peat Marwick and ZHA
International Inc., will be involved in this process. Factors to be addressed include:
■ Space requirements ■ Storage space
■ Seating requirements ■ Parking and traffic circulation
■ Lobbies and pre-function areas ■ Loading and trash docks
■ Ceiling heights ■ Expansion strategies
■ Kitchen space ■ Other factors as appropriate
STEP 5 - Evaluate the Proposed Site
The location of a conference center is an important factor in a meeting planner's decision making
process. Consequently, the evaluation of the proposed site for the facility is a key factor in
determining the feasibility of the project. Both KPMG and ZHA will be involved in the evaluation
of the existing auditorium site. The analysis will evaluate several criteria and each criteria will be
weighted based on importance. The evaluation will include the following factors.
KPMG Peat Marwick
Ms. Mayra Diaz-Buttacavoli
July 9, 1993
Page 6 of 12
Site Marketability Site Size
Proximity to area hotels Ability to accommodate facility needs
Hotel rooms within walking distance Ability to accommodate surface parking
Hotel rooms within shuttle distance Ability to accommodate structure
Distance to airport parking
Proximity to retail and restaurants Ingress and egress
Ability to accommodate expansion
Site Access Site Rehab Costs
Via truck Demolition(if any)
Via pedestrian Site preparation
Nearby traffic Surface parking
Off-site parking Structure parking
Other as appropriate
STEP 6 - Estimate the Conversion Costs and Funding Requirements
Based on completed conference center construction cost information, adjusted to the Miami
Beach level, ZHA will estimate the order of magnitude of costs to renovate the existing facilities.
Factors to be addressed include:
• Design • Other Fees and Expenses
• Site development • Contingencies
• Construction • Other factors as appropriate
• Furniture, Fixtures and Equipment
KPMG will use the estimate of costs to evaluate funding requirements and identify possible
funding methods. This area is where we differentiate ourselves among our competitors. We have
recently helped several clients through the financing stage including the Charlotte Convention
Center (in Certificates of Participation - COPs), the Cobb County Convention Center in Atlanta
(Revenue Bonds), the Myrtle Beach Convention Center (COPs), McCormick Place in Chicago
(Revenue Bonds) and various facilities in Dade County Florida (Revenue Bonds). The staff that
assisted these clients will work on this engagement.
Based on this experience, we will work closely with you to identify and evaluate alternative
methods to finance the operating deficit and fund the project. Our experience includes
KPMG Peat Marwick
Ms. Mayra Diaz-Buttacavoli
July 9, 1993
Page 7 of 12
establishing funding plans that has included local, state and even federal sources. Our
relationships with the financing community will enable us to provide you with up-to-date financial
market information that will enable you to develop a funding plan that can be well received by
potential funding sources.
STEP 7 - Evaluate Operational Characteristics of the Project
We will outline various operational concepts that can and/or should be implemented. Areas to be
discussed include:
• Recommendations of who is to market/sell conference center and who is to operate
the facility.
• Mission statement - to guide the overall direction of the project.
• Booking policies at area hotels and the center - to implement the mission statement.
• Centralized reservations system and coordination with existing community hotel and
visitor assesments.
• Management- to determine if public or private management best implements the
mission.
• Operations recommendations to market, sell and operate the center.
• Marketing - to outline responsibilities and goals. We expect to have input from the
various groups involved in marketing the area including the Greater Miami
Convention and Visitors Bureau, the Miami Beach Hotel and Motel Association, the
Ocean Drive Association, Miami Beach Development Corporation, and other similar
groups.
STEP 8 - Estimate Operating Revenues and Expenses
Based on the information provided by the market analysis, historical operating data and
comparable facility operating data, we will estimate operating revenues and expenses over a five
year period, both with and without dining facilities. The analysis shall include and define all major
assumptions and alternatives regarding projected revenues and expenses as follows:
. . .
- .
, .
ANNIP
Peat Marwick
Ms. Mayra Diaz-Buttacavoli
July 9, 1993
Page 8 of 12
Revenues Expenses
Space Rental Staffing
Equipment rental Benefits
User labor charges Contracted services
Food&beverage revenues/commissions Utilities
Parking revenues Insurance
Other revenues, as appropriate Repairs and maintenance
Advertising/promotions
Capital reserves
Other expenses, as appropriate
STEP 9 - Estimate the Project's Impact on Area Hotels
The final step in our analysis will estimate the impact the proposed conference center will have on
South Beach hotel operations. We will utilize the projection of room night information from Step
3 in addition to average daily rates in the area and expense ratios to determine the impact on
hotels on a per room night basis.
SUMMARY OF FINDINGS
Upon completion of the above tasks, we will present our findings to city and community leaders
in the form of an oral presentation and a brief written report.
TIMING
Studies of this type typically take eight to twelve weeks to complete. The study will be an
interactive process. We will discuss preliminary findings throughout the project. In advance of
client work sessions, appropriate materials would be submitted in order to communicate our
findings and conclusions. Upon completion of the study, we will issue a draft report for your
review. Upon mutually agreed upon review comments, we will issue our final report.
+ , ,
KPMG Peat Marwick
Ms. Mayra Diaz-Buttacavoli
July 9, 1993
Page 9 of 12
We have budgeted several meetings as part of our scope of services. They are:
Kick-off meeting with the client group 1 Day
Field work meetings: 1 Week
City and County Officials
Existing facility management
Convention and Visitors Bureau
Chambers of Commerce
Potential local corporate users and industry participants
Others as identified
Work session with client group to discuss preliminary findings 1 Day
Formal work sessions and presentation(s) to client group 1 Day
ESTIMATED FEES
We have estimated professional fees and expensess based on our familiarity with the steps
required to complete the project. It is consistent with what we have been paid in similar
studies.
KPMG ZHi Total
1 - Review Existing Data and Resources
2- Assess the Market Potential of a Conference Center in the
South Beach Area
3 - Estimate Event Demand and Room Night Impact
Subtotal Step 1-3 $25,000 $0 $25,000
4 - Develop a Facility Program that Address the Market's
Needs
5 - Evaluate the Proposed Site
6- Estimate the Physical Modifications Costs and Funding
Requirements
Subtotal Step 4-6 2,000 5,000 7,000
7 - Evaluate Operational Characteristics of the Project
8- Estimate Operating Revenues and Expenses
9 - Estimate the Project's Impact on Area Hotels
Subtotal Step 7-9 3,000 0 3,000
$30,000 $5,000 $35,000
Invoices will be based on hours worked to date multiplied by our standard billing rates.
Invoices will be submitted throughout the engagement and will be due upon receipt. KPMG
KPMG Peat Marwick
Ms. Mayra Diaz-Buttacavoli
July 9, 1993
Page 10 of 12
requires a retainer in the amount of$15,000 to begin this engagement. Our fee is not
contingent upon our analysis and all progress bills for fees and expenses are to be paid before
we issue our draft and final reports. Accounts unpaid after 30 days are delinquent and
subject to interest charges at the rate of 1-1/2% per month.
CLIENT RESPONSIBILITIES
To enable KPMG and ZHA to efficiently complete the project, it is assumed the City will:
1. Enable KPMG to plan trips to Miami Beach in advance to take advantage of lower
airfares.
2. Help schedule fieldwork meetings with existing facility management, Convention and
Visitors Bureau, Chambers of Commerce and others as identified.
3. Provide historical operating revenue and expense information for the past two fiscal
years. The information provided should be of a level of detail similar to that outlined in
Task 8 of this proposal.
4. Provide historical organization structure and staffing levels for the past two fiscal years.
5. Provide historical event information.
6. Provide a listing of event turnaways (if maintained).
7. Provide a listing of area hotels outlining number of rooms, area of city, committable
rooms (if available), average daily rates (if available) and meeting space.
CONTRACTUAL CONDITIONS
The following conditions are in accordance with our Firm's policy. Should you have any
questions concerning any of the conditions, please feel free to call us.
The findings and recommendations of our research will reflect analyses of primary and
secondary sources of information. Estimates and analyses presented in the report will be based
on economic trends and market assumptions which are subject to variation. Our financial
'w
PNAMPeat Marwick
Ms. Mayra Diaz-Buttacavoli
July 9, 1993
Page 11 of 12
analysis will be made from information provided by the market analysis and from information
provided by management.
Our work is for internal planning use by the City and is restricted from distribution to any third
party. If third party uses (for financing, etc.) are contemplated, we will issue a separate
engagement letter outlining the applicable conditions pertaining to this portion of our work.
The City is responsible for representations about its plan and expectations and for disclosure of
significant information that might affect the ultimate realization of the projected results. We
will have no responsibility to update our report for events and circumstances occurring after the
date of our report. If for any reason you wish to terminate our work during the course of the
engagement, you reserve the right and we would terminate our engagement immediately and
only bill you for the fees and expenses incurred to date. It is understood in accepting this
proposal that neither fees nor payment of expenses is contingent upon the result of the
engagement.
The proposal and attachments are confidential. Reproduction or use for other than the purposes
intended is prohibited without prior written approval.
We look forward to working with you on this important project. Should you have any questions,
please do not hesitate to call me at 305-789-2642.
Very truly yours,
KPMG Peat Marwick
Jeff Sachs, Manager
Convention, Sports and Entertainment Consulting
KPMG Peat Marwick
Ms. Mayra Diaz-Buttacavoli
July 9, 1993
Page 12 of 12
AUTHORIZATION TO PROCEED
If the services described in the foregoing proposal are in accordance with your requirements
and are acceptable, please indicate by signing below.
Signature Ii
Date S./(-11413
Title City Manager
ATTEST:
•cist„,_
City Clerk
Uic1li11Nk1L
RESOLUTION NO. 93-20852
Authorizing the Mayor and the City Manager
to enter into an agreement with KPMG Peat
Marwick for the purpose of a feasibility
study of the 10th Street Auditorium.