TRAFFIC STUDYCity of Miami Beach Commission Update February 12, 2020 * This schedule does not reflect days added to the contract for holidays, weather days or special events 2 UPCOMING & ONGOING CONSTRUCTION ACTIVITIES Ongoing concrete pavement saw cutting in preparation for concrete replacement TRAFFIC SHIFT: All I-95 travel lanes shifted to the right on southbound I-95 from SR 836 to NW 8 Street to allow the contractor to construct new bridge foundations. * This schedule does not reflect days added to the contract for holidays, weather days or special events 3 ONGOING LANE CLOSURES THREE MONTH LOOK AHEAD ANTICIPATED NIGHTTIME LANE CLOSURES ON THE I-95 CORRIDOR: •Full closure of northbound and southbound I-95 to relocate a crane to the east side of I-95 •Nighttime lane closure along I-95 between NW 8 Street and NW 29 Street •Continuous weekend lane closures for pavement work •Closure of I-95 entrance ramp at NW 8 Street •I-95 ramps to I-395 and SR 836 4 Ongoing work on eastbound SR 836 from NW 17 Avenue to the Miami River and from NW 12 Avenue to I-95 for bridge widening CONSTRUCTION ACTIVITIES SR 836 UPCOMING CONSTRUCTION ACTIVITIES 5 ANTICIPATED NIGHTTIME LANE CLOSURES ON SR 836 CORRIDOR: •Single and double lane closures along eastbound and westbound SR 836 •NW 17 Avenue under SR 836 •SR 836 ramps to northbound and southbound I-95 •Arterial roads under SR 836 •NW 17 Avenue and NW 12 Avenue ramps to SR 836 ONGOING LANE CLOSURES THREE MONTH LOOK AHEAD SR 836 UPCOMING CONSTRUCTION ACTIVITIES 6 1.Removal of median separator between the eastbound I-395 mainline and the westbound mainline (Ongoing) 2.Construction of westbound outside, local road lanes. Foundation work started at NE 2 Avenue and is moving towards the west (Ongoing) 3.Begin demolition of portions of existing eastbound I-395 to allow for the construction of new bridge foundations (February) UPCOMING & ONGOING CONSTRUCTION ACTIVITIES 1 2 3 SR 836 UPCOMING CONSTRUCTION ACTIVITIES 7 CONSTRUCTION ACTIVITIES I-395 steel sheet pile driving for Signature Bridge center pier * This schedule does not reflect days added to the contract for holidays, weather days or special events 8 •Auger Cast Pile (ACP) Operations for Segmental Bridges started in late December 2019 •ACP Completed: 160/1948 o I-395 Segmental ACP –857 o I-395 Signature ACP –520 o SR 836 Viaduct ACP -571 UPCOMING & ONGOING CONSTRUCTION ACTIVITIES * This schedule does not reflect days added to the contract for holidays, weather days or special events 9 UPCOMING & ONGOING CONSTRUCTION ACTIVITIES Shift traffic to the left on the westbound MacArthur Causeway approach to Biscayne Boulevard exit (February 17, 2020) * This schedule does not reflect days added to the contract for holidays, weather days or special events 10 UPCOMING & ONGOING CONSTRUCTION ACTIVITIES Lane shift (to south side) on the westbound MacArthur Causeway ramp to Biscayne Boulevard to allow for clearing and grubbing activities. This will allow for construction of new retaining wall (February,17 2020) * This schedule does not reflect days added to the contract for holidays, weather days or special events 11 UPCOMING & ONGOING CONSTRUCTION ACTIVITIES Traffic shift on Biscayne Boulevard from NE 13 Street to NE 11 Terrace. There will be three NB Lanes (two through lanes and one left turn lane onto NE 13 Street) and three SB Lanes (two through lanes and one left turn lane onto EB MacArthur Causeway) Close Bayshore loop ramp to EB MacArthur Causeway (March 2020) 1 1 2 2 SR 836 UPCOMING CONSTRUCTION ACTIVITIES 12 ANTICIPATED NIGHTTIME LANE CLOSURES ON I-395 CORRIDOR: •Lane closures along eastbound and westbound I-395 •Lane closures along Biscayne Boulevard and other arterial roadways adjacent to I-395 •I-395 to I-95 ramp closures ONGOING LANE CLOSURES THREE MONTH LOOK AHEAD 13 COMMUNITY OUTREACH PROJECT WEBSITE •www.i-395miami.com •Sign-up for project alerts/updates Lane closure information Upcoming construction activities Presentations •Calendar of events OUTREACH OFFICE IN THE OVERTOWN COMMUNITY •1035 NW 3 Avenue, Miami, Florida 33136 STAKEHOLDER MEETINGS •Ongoing individual stakeholder meetings and presentations •Next stakeholder meeting –March 16, 2020 786-280-0983 OGonzalez@mrgmiami.com Contact: Oscar Gonzalez www.i-395miami.com THANK YOU! 14