Amendment No. 47 to the Agreement between CMB and Fentress Architects AMENDMENT NO.47 TO THE AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND FENTRESS ARCHITECTS, DATED MAY 14, 2014, FOR DESIGN CRITERIA PROFESSIONAL SERVICES FOR THE MIAMI BEACH CONVENTION CENTER RENOVATION PROJECT, IN THE AMOUNT OF $42,035 This Amendment No. 46 to the Agreement made and entered this day of H MICS , 2020, by and between the CITY OF MIAMI BEACH, a municipal corporation existing under the laws of the State of Florida (hereinafter referred to as City), having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 33139, and FENTRESS ARCHITECTS, a Colorado corporation, having its offices at 421 Broadway, Denver, Colorado (hereinafter referred to as "Consultant" or"Architect-Engineer"). RECITALS WHEREAS, pursuant to Request for Qualifications (RFQ) No. 2014-142ME, the Mayor and City Commission adopted Resolution No. 2014-28538 on April 9, 2014, approving and authorizing the Mayor and City Clerk to execute an Agreement with Fentress Architects for Design Criteria Professional Services for the Miami Beach Convention Center Renovation Project(the"Agreement"); and WHEREAS, the Agreement was executed for a lump sum amount of $10,967,200 including reimbursable . expenses; and WHEREAS, on December 8, 2014, Amendment No. 1 was executed for correction to Task 3 - Design Development and Design Criteria Package Services, requiring 30% completion level for low voltage systems in lieu of 90%completion; and WHEREAS, on December 8, 2014, Amendment No. 2 was executed for supplemental civil engineering services in the amount of$41,079; and WHEREAS, on December 8, 2014, Amendment No. 3 was executed for additional services to revise the quantity, sizes and configurations of the main ballroom, junior ballrooms, and meeting rooms, in the amount of $179,982; and WHEREAS, on January 21, 2015, Amendment No. 4 was executed for a regional stormwater pump station location analysis, and for the development of a 3D animation and custom website for the Project in the amount of $76,605; and WHEREAS, on February 11, 2015, the City Commission authorized Resolution No. 2015-28925, authorizing an additional lump sum amount of $14,469,500, for the purpose of retaining Fentress to complete all design and construction administration services for the Project; and WHEREAS, on March 31, 2015, Amendment No. 5 was executed for the completion of design development documents and preparation of Bid Package 1, in the amount of$2,442,400 (part of Resolution No. 2015-28925); and WHEREAS, on May 28, 2015, Amendment No. 6 was executed for a deductive adjustment to the Agreement in the total amount of $3,129,259, to delete the remaining Tasks 4, 5 and 6 of the Scope of Services set forth in Schedule A of the Agreement, as such tasks are no longer applicable and shall be superseded by a subsequent amendment with regard to the construction documentation and administration services required for the Project (part of Resolution No. 2015-28925); and WHEREAS, on May 28, 2015, Amendment No. 7 was executed for Additional Services relating to wind loading and micro-climate services, in the amount of$117,200; WHEREAS, on May 28, 2015, Amendment No. 8 was executed to retain Fentress Architects to serve as Architect of Record for the Project, to clarify requirements with regard to Design Development, and to provide for completion of Construction Documents and all construction administration services required of the Architect-Engineer for the Project, in the total amount of$15,156,359 (part of Resolution No. 2015-28925); and 1 • WHEREAS, on August 14, 2015, Amendment No. 9 was executed for the provision of Commissioning Services, in the total amount of$302,876; and • WHEREAS, on October 27, 2015, Amendment No. 10 was executed for a parapet design analysis and consultation services to reduce the applicable wind pressures on the curtain wall for potential construction cost reductions, in the amount of$15,000; and WHEREAS, on December 4, 2015, Amendment No. 11 was executed for the preparation of event plans background drawings to be used by event planners during construction, in the amount of$36,875; and WHEREAS, on March 29, 2016, Amendment No. 12 was executed for stormwater design revisions related • to Public Works Department's pump stations design, in the amount of$34,073; and WHEREAS, on May 31, 2016, Amendment No. 13 was executed for design changes associated with the removal of the smoke control system, in the amount of$173,790; and WHEREAS, on June 10, 2016, Amendment No. 14 was executed for additional site visits by members of the design team for a weekly presence through July 28,2016,and for the implementation of alternative designs requested by the Construction Manager, in the amount of$148,999; and WHEREAS, on July 18, 2016, Amendment No. 15 was executed for design changes associated with raising 18th Street, 19th Street and Convention Center Drive, requested by Public Works to allow the raising of Meridian Avenue and 17th Street in the future, in the amount of$111,338; and WHEREAS, on August 26, 2016 Amendment No. 16 was executed for the addition of a 72" storm culvert to serve as a temporaryy bypass until the new culvert on 17th Street is completed by Public Works; and for the redesign of Convention Center Drive between 17th and 18th Streets due to the postponement of the Convention Center Hotel Project, in the amount of$70,270; and WHEREAS, on September 7, 2016, Amendment No. 17 was executed for GMP cost reconciliation services beyond what was originally contemplated in the basic construction administration services, in the amount of$49,360; and WHEREAS, on September 7, 2016, Amendment No. 18 was executed for additional site visits by members of the design team for a weekly presence through approximately September 30, 2016, and for the implementation of alternative designs requested by the Construction Manager, in the amount of$112,649; and WHEREAS, on October 24, 2016, Amendment No. 19 was executed for design changes associated with retaining the east half of the existing exhibit hall bridge to provide more flexibility in egress travel distances of show layouts, in the amount of 220,291; and WHEREAS, on November 16, 2016, Amendment No. 20 was executed for additional reviews of steel submittals and for revisions of levels two and five truss loading for temporary conditions for Art Basel 2016; this Amendment is to be funded from a deductive change order to the Agreement with Clark Construction; in the amount of$96,710; and WHEREAS, on December 20, 2016, Amendment No. 21 was executed for additional design services associated with the incorporation of additional security cameras, revisions to vaults requested by FPL, additional structural engineering resulting from unforeseen site conditions (RFIs), construction details for the temporary transition slab required for Art Basel 2016, and renovation of the east kitchen not included in the original scope of work, in the amount of$80,330; and WHEREAS, on December 20, 2016, Amendment No. 22 was executed for revisions to the construction documents as needed for artwork installations by Sarah Moris, Franz Ackermann and Ellen Harvey, selected as part of the Art in Public Places Program, in the amount of$17,121; and WHEREAS, on December 20, 2016, Amendment No. 23 was executed for additional structural engineering services due to non-conformances by Clark Construction, in the amount of$10,000; and WHEREAS, on January 18, 2017, Amendment No. 24 was executed for additional design, permitting and construction administration 'services related to a new sanitary sewer lateral for the Carl Fisher Clubhouse, in the amount of$18,625; and 2 • WHEREAS, on May 5, 2017, Amendment No. 25 was executed for revisions to the signage package, in the amount of$12,030; and WHEREAS, on May 5, 2017,Amendment No. 26 was executed for additional reviews of structural submittals and for design revisions associated with non-conforming field conditions, funded from a deductive change order to the Agreement with Clark Construction, in the amount of$15,580; and WHEREAS, on May 5, 2017, Amendment No. 27 was executed for design services to incorporate a new vertical circulation connection between the north side of the Exhibit Hall D and the Grand Ballroom on Level 2, in the amount of 124,240, as approved by the City Commission on April 26, 2017 (Agenda Item R7T); and WHEREAS, on June 30, 2017, Amendment No. 28 was executed for design revisions associated with the relocation of the 19th Street pump station, in the amount of$2,585; and WHEREAS, on August 15, 2017, Amendment No. 29 was executed for design solutions for contractor- requested items related to dosing non-conforming conditions related to RFI 3251, and for additional reviews of structural submittals,funded from a deductive change order to the Agreement with Clark Construction, in the amount of$30,875 ; and WHEREAS, on August 18, 2017, Amendment No. 30 was executed for additional services associated with revisions to the P-Lot Park design, as approved by the City Commission on July 26, 2017, in the amount of 349,076; and WHEREAS, on September 18, 2017, Amendment No. 31 was executed for revisions to the construction documents as needed for artwork installations by Joseph Kosuth,selected as part of the Art in.Public Places Program, in the amount of$14,570; and WHEREAS, on September 18, 2017, Amendment No. 32 was executed for revisions to the construction documents approved in Amendment No. 27, to accommodate the construction that progressed during the delayed issuance of the package due to extended negotiations with Art Basel, in the amount of$11,430; and WHEREAS, on September 19, 2017, Amendment No. 33 was executed for drainage revisions associated with keeping the existing culvert that crosses the P-Lot in lieu of removal, as requested by Public Works, due to the postponement of the 17th Street drainage improvements, in the amount of$11,985, and for revisions to the southwest corner rendering in the amount of$1,350; and WHEREAS, on December 15, 2015, Amendment No. 34 was executed for additional reviews of structural submittals, and for design solutions for contractor-requested items related to closing non-conforming conditions, in the amount of$50,785, to be funded from a deductive change order to the Agreement with Clark Construction; and WHEREAS,on December 15, 2017, Amendment No. 35 was executed for design revisions to the 21St Street Park as a result of the pump station installation and changes required for AIPP installations in the amount of$43,788, and for design solutions for the repair to the existing culvert which collapsed during installation of the new culvert, in the amount of$4,840; and WHEREAS, August 6, 2018, Amendment No. 36 was executed for 19th Street revisions as a result of pump station relocation, and additional construction administration services through November 30, 2018, in the amount of $136,408; and WHEREAS, on September 21, 2018, Amendment No. 37 was executed for design revisions to 21st Street Park associated with retaining existing mahoganies and de-scoping sitework around Carl Fisher Clubhouse and Pump Station; reconciliation of relocated trees and associated design revisions to 21St Park; and 19th Street revisions as a result of the Holocaust Memorial's request to keep the existing stone cladded knee wall; in the amount of $50,320; and WHEREAS,on September 25,2018,Amendment No.38 was executed for the development of a stand-alone package for the P-Lot Park for a separate permit, structural footing design for events tent structures, and additional services for re-bidding and construction administration of the park, in the amount of$261,445; and WHEREAS, on January 9, 2019 Amendment No. 39 was executed for the analysis, design and documentation to reinforce the existing structure to withstand additional cooling tower loads (NCR 3363 and RFI 3691), an updated site plan rendering, and extended construction administration services for the building, in the 3 • amount of$206,510; and • WHEREAS, on.February 28, 2019,Amendment No. 40 was executed for additional design services required to redesign the routing of the Florida Power and Light(FP&L) ductbank for P-Lot Park, in the amount of$5,328; and • WHEREAS; on February 28, 2019, Amendment No. 41 was executed for additional design services related to revised pavement striping at 18th Street as requested by Transportation Department, and electrical revisions at 21st Street Park, in the amount of$7,125; and WHEREAS, on March 29, 2019,Amendment No.42 was executed for extended Construction Administration Services through August 31, 2019, in the amount of$263,250; and WHEREAS, on May 22, 2019, Amendment No. 43 was executed for the incorporation of Requests for Information (RF1's) into the contract documents, required for permit revision, in the amount of$45,180; and WHEREAS, on September 10, 2019, Amendment No. 44 was executed for extended Construction Administration Services through January 31, 2020, in the amount of 120,450; and WHEREAS, on January 13, 2020, Amendment No. 45 was executed for letters from Structural Engineer required for Special Events Permits through Antique Show of January 2020, additional services for Life Safety Consultant related to fire alarm changes, evaluation of electrical equipment in room 1.29.35 due to water leak, and additional services for Structural Engineer for review of conduit installation in the fifth floor topping slab; and WHEREAS, on , 2020, Amendment No. 46 was executed for additional construction administration services for the building through June 30, 2020, additional forty (40) letters from Structural Engineer required for Special Events Permits through July 2020, structural engineer evaluation of damage to an escalator support column caused during load-in/load-out of a show requested by the Building Official; and WHEREAS, this Amendment No. 47 is for additional construction administration services for P-Lot Park. NOW, THEREFORE, the parties hereto, and in consideration of the mutual promises, covenants, agreements, terms, and conditions herein contained, and other good and valuable consideration,qhe respect and adequacy are hereby acknowledged, do agree as follows: 1. ABOVE RECITALS. The above recitals are true and correct and are incorporated as a part of this Amendment No. 47. 2. MODIFICATIONS. The Agreement is amended as provided in Appendix"A-47", attached herein. 3. OTHER PROVISIONS. All other provisions of the Agreement, as amended, are unchanged and in full force and effect. 4. RATIFICATION. The City and Consultant ratify the terms of the Agreement, as amended by this Amendment No.47. • 4 IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 47 to be executed in their names by their duly authorized officials as of the date first set fo above. I ATTES ' CITY OMIAMI B ACH 4 t `ir� Rafael Granado Jimmy L� Morale City Clerk City Ma =ger T ST: CONSULTANT: ))/tovn F HITEC Signature: Signature Cl'elaoSIOQc\, Ot-k ce Ac n Cur A is (A). 1eni cess, Presi dent I-CEO Print Name/Title Print Name/Title vol(��Nwav\Mil • kr ,a "1� 3,Jo' .• •• . " .. APPROVED AS TO ek •G '`� �„,, •.: ! FORM &LANGUAGE ° : uO ) & OR ECUTION RF ORAT�U , �`� • � 4r 3-* II - 1- v ‘42ry • ...... City Att• . (} ,p ) Date 5 Appendix"A-47 1. SCOPE OF SERVICES Refer to attached proposal dated February 26, 2020. 2. PAYMENT AND COMPENSATION Fentress Architects One additional trip:12,800 lump sum upon completion $1,120 reimbursables $3,920 TOTAL West 8 Extended CA: $16,155 (January through March 2020) 11 trips: $22,000 ($2,000 per trip,which includes 10hrs of PM time and trip expenses) $38,155 TOTAL GRAND TOTAL: $42,035 6 Added Project Contingency Scope Total Original Agreement $10,967,200 $1,096,720 $12,063,920 Amendment--Reso 2015-28925 (5,6&8) Amendment 5 $ 2,442,400 $ 2,442,400 Amendment 6 $(3,129,259) $(3,129,259) Amendment8 • $15,156,3591 $15,156,359 Contingency reduction $ (96,720) $ (96,720) Total $25,436,700 $1,000,000 $26,436,700 Amendment 2-Civil $ 41,079 Amendment 3-Ballrm change $ 179,982 Amendment 4-Stormwater/website ,$ 76,605 Amendment 7-Wind study/roof survey $ 117,200 Amendment 9-Commissioning $ 302,876 Amendment 10-Parapet Analysis $ 15,000 Amendment 11-Event Plans $ 36,875 Amendment 12-Stormwater Revisions $ 34,073 Amendment 13-Smoke Control Removal $ 173,790 Amendment 14-Site Visits&Alternative Design $ - $ 148,999 Amendment 15-Streets Regrading $ 22,520 $ 88,818 Amendment 16-Culvert and Cony Ctr Dr redesign $ 70,270 Amendment 17-GMP Reconciliation-add'I $ 49,360 Amendment 18-Additional Site Visits $ 112,649 Amendment 19-East Bridge Retention $ 220,291 Amendment 20-Steel submittals and Truss loading analysis $ 96,710 Amendment 21-Cameras,vaults,RFIs,kitchen,transition slab $ 80,330 Amendment 22-AIPP(Morris,Ackermann&Harvey) $ 17,121 Amendment 23-NCRs* $ 10,000 Amendment 24-Sanitary Sewer Lateral -Carl Fisher Clubhouse $ 18,625 Amendment 25-Signage Package Revisions $ 12,030 Amendment 26-Structural submittals&NCRs $ 15,580 Amendment 27-Exhibit hall/Ballroom Vertical Circulation $ 124,240 Amendment 28-19th Street Pump Station Relocation $ 2,585 Amendment 29-RFI 3251&Structural Submittals $ 30,875 Amendment 30-P-Lot Park Revision $ 349,076 Amendment 31-AIPP(Joseph Kosuth) $ 14,570 Amendment 32-Exhibit Hall/Ballroom Vertical Circulation rev $ 11,430 • Amendment 33-Plot culvert and rendering $ 13,335 Amendment 34-Structural Submittals&/NCRs $ 50,785 Amendment 35-21st St Park Rev&Culvert repair $ 48,628 Amendment 36-19th St and CA Services $ 136,408 Amendment 37-21st Park,Tree Reconc,19th St $ 50,320 Amendment 38-Plot Park Repackaging and CA services $ 261,445 Amendment 39-Rendering,NCR 3363,Add'I CA Services Bldg $ 206,510 Amendment 40-Plot Park-FPL Ductbank $ 5,328 Amendment 41-18th St pavement marking and 21st elec • $ 7,125 Amendment 42-Extended CA and RFIs review $ 263,250 Amendment 43-Incorporation of RFIs into Contract Documents $ 45,180 Amendment 44-Extended CA $ 120,450 Amendment 45-Event letters,LS Consultant,Strutt Eng,Electrical equipment eval. $ 44,325 Amendment 46-Extended CA,Event Letters,Structural Eng Eval damaged column $ 129,750 Amendment 47-Extended CA for P-Lot Park(Pride Park) $ 42,035 Total $25,436,700 $1,000,000 $2,898,433 $29,335,133 1. Amendments 14, 18,20,23,26,29 and 34 totaling$465,598,funded from Clark's contract via deductive change orders. 2. Amendments 22&31 totaling$31,691 funded from AIPP fund. 7 i > si ti � R lentres sa rc n i tests.cam November 21, 2019 February 26, 2020-Revised Mr. Jimmy Morales, City Manager City Manager's Office City of Miami Beach , 1700 Convention Center Drive 4th Floor Miami Beach, FL 33139 Re: Miami Beach Convention Center Renovation Resolution No. 2014-28538 Proposal 77-P Lot Park Additional Site Visits and extended Contract Administration Project 20140021.001 A72 Dear Mr. Morales: This proposal is to provide additional site visits for the P Lot Park, pursuant to the City's Capital Improvement Projects Office's request. The current contract, as amended, provided two (2)trips by Fentress Architects and eight(8)trips by West 8.This proposal provides for additional trips as listed below: • Fentress Architects-One (1) additional trip • West 8-Eleven (11) additional trips (7 of which have already been performed) • West 8-Extension of Contract Administration from January through March 2020 Fees associated for these trips as identified above will be billed as a lump sum amount of Forty-Two Thousand and Thirty-Five Dollars ($42,035.00). Expense costs for travel are included in the lump sum fee for West 8 as are a reimbursable expense for Fentress Architects. Billings for these services will be invoiced under the heading#20140021.001, A72. Attached is the breakdown of hours and associated fees for this additional effort. Your assistance in facilitating the request of this additional effort as a modification to our contract is appreciated. Please feel free to contact me with any further questions or comments you may have. If the foregoing correctly states your understanding, please prepare a contract amendment for our execution. We are very happy to be of service to the City and continue our successful relationship. Sincerely, Fentress Architects (4 -JL '14 7.:,.. -r:S/.- John Kudrycki,AI . , LEER. •BD+C Principal enol: Design Fee Summary dated February 26, 2020 c: Maria Hernandez, Thais Vieira, City of Miami Beach Steven DiBartolo, Karen Deshon, Hill International, Inc. Ryan Chessmore, David Burkey, Anne McNeely, Jenni Gee, Fentress Architects DEN DC LA SF ri0o 1 427 Broadw:,y 1 Denver CO 80203 i 303. 722 . 5000 Project: P Lot Park Additional Site Visits & Extended CA Miami Beach Convention Center Renovation&Expansion 2126120 Park Redesign Discipline Firm Name Firm Fee Number Architecture Fentress Architects 1 $2,800 Architecture Arquitectonica 4 _ ._ _r$0 Fire/Life Safety/Code Consulting Jensen Hughes 13 $0 Civil/Utility Engineering . Kimley-Horn 6 $Q Landscape West 8 7 $38,115 Structural Engineering Wallace 8 $0 Vertical Transportation Lerch Bates 12 $0 Plumb,Mech,Elec,Lighting ME Engineers 14-18 $0 IT,Security,AV,Acoustics DL Adams 20 $0 Food Service Caruso 25 $0 Graphics and Signage TKD 28 s $0 Parking Consultation Walker Parking 29 Design Fees $40,915 Expenses $1,120 Total Total $42,035 P Lot Park Additional Site Visits &Extended CA Fentress Architects Hours Job Title Hourly Rate Hours Extension Additional Site Visits Architect 1II--Chessmore 2 days(ate 8 hrs $175.00 16 $2,800.00 Architect 1I $150.00 0 $0.00 Intern Architect 11 $110.00 0 $0.00 John Kudrycki $225.00 0 $0.00 Totals this activity: Hours 16.0 $2,800.00 Expenses 1-2 day trip $1,120 Total $3,920 I Trip Total $3,920.00 P Lot Park Additional Site Visits Miami Beach Convention Center Fentress Project No:20140021 Page 2 of 3 P Lot Park Additional Site Visits & Extended CA West 8 Hours Job Title Hourly Rate Hours Extension Additional CA Services&Site Visits Design Director $375.00 2 $750.00 Principal/Director $250.00 8 $2,000.00 Project Director $185.00 0 $0.00 Project Manager $165.00 81 $13,365.00 Landscape Designer $115.00 0 $0.00 Staff Designer $85.00 0 $0.00 Administrative $85.00 0 $0.00 Totals this activity: Hours 91.0 $16,115.00 Expenses for 1 trip $2,000 I 1 Trips 11 Total $22,000 Total Lump Sum $38,115.00 P Lot Park Additional Site Visits Miami Beach Convention Center Fentress Project No:20140021 Page 3 of3 4 1131 • t Updated February 26, 2020 John Kudrycki AIA, LEED AP BD + C Associate Principal Fentress Architects 421 Broadway Denver, CO 80203 RE:Additional Service Request-Convention Center Park, Miami Beach FL • (11)ADDITIONAL SITE VISITS Dear John, Following our discussions with the City of Miami Beach on November 4th, 2019 we are requesting additional services for Construction Administration Site Visits.As of October 11, 2019,we have used our originally contracted amount. All visits after this date shall be accounted for in this proposal. To date,West 8 has used 3 of the 8 proposed visits: 1. Oct. 24"'•-Site Walk with City + Construction Team 2. Nov. 22nd-Tree Tagging 3. Nov. 25th-Tree Tagging 4. Dec. 5m-Concrete "fixes" review + Coral Stone Paver Mock-up? 5.Jan. 8-9th-Came on the request to review coral stone mock-up and concrete amendments around Memorial Plaza. Neither were complete. Reviewed Arced Joint Mock-Up and Bench Mock-Ups. Physically marked concrete non-conformities with yellow tape throughout the site. 6.Jan, 14- 16-Came on the request to review Coral Stone Mock-up, which was not complete. Reviewed crack filler(rejected). Physically tagged and rejected trees. Physically tagged trees to be lowered. Observed and coordinated shrub installation. Detailed Review of tent footer elevation. 7.February 10-14th-Concrete deficiencies walk, Final Walk for Memorial Plaza concrete rejection, Review of new trees installed, Oversite of joint installation 8. February 19-21 -Review of completed concrete with control and arced joints completed. Review of metal screen color samples. Review of Bench concrete color 3.0,West 8 Senior Associate Donna Bridgeman walked the site with Critical Path reviewing concrete and strategizing rejection areas. West 8 urban design and landscape architecture,p.c. 333 Hudson Street,Suite 905 New York,NY 10013 t: 212 285 0088 t:212 285 0228 www.west8.com/ny � F A k 5 *January 30-31 we will not be billing for at this time; however,we reviewed Bench Concrete color mock-up and false joint mock-up, and observed sod being installed by Design Miami SITE VISITS NOT TAKEN YET 9. Review and Observation of Coral Stone Paver Mock-up, concrete amendments, Bench mock-ups, and Palm Tree adjustments 10. Punchlist Walk-Final Review and Punchlist of Fine Grading, Concrete, and Coral Stone areas 11. Final Close-Out-Complete Punchlist Item Review 1. PROJECT INTRODUCTION The West 8 team is pleased to submit the scope for additional services for the Miami Beach Convention Center Park in Miami Beach, FL.The scope of work consists of the following tasks; (5)Additional Site Visits. 2. ADDITIONAL SERVICE ITEMS SCOPE. Additional services request essentials the following tasks: A. (11)Additional Site Visits Tasks for this phase of work include: a. (1) Day Site Observation of the project site (max. 1 person) b. Visits, as necessary,to tree nurseries (max. 1 person) c. On-site meetings, as requested, by the construction/client/prime team member(s) Deliverables: (1) Site Observation Report per,visit, or consolidated if trips are taken within 1 week of the prior visit Work beyond this schedule may be additional service. 3. FEES All terms and conditions of the Prime (between City of Miami Beach and Fentress) and Sub-Consultant agreement (between Fentress and West 8 urban design and landscape architecture p.c.)apply. Latest service agreement regarding the Miami Beach Convention Center Park dated 13 August 2018. West 8's lump sum for this additional service Professional Labor fee is$22,000.00.A breakdown of this work by task is as follows: $2,000.00 per site visit. (Includes 10 hours @ Project Manager rate of$165/hour + Travel Reimbursables) TOTAL:$22,000.00 477„, } • -t=4 .'l 70 R. 4. ASSUMPTIONS AND EXCLUSIONS Along with our scope and fee proposal we are including in this section a list of key assumptions that underlie our outline and allocation of fee. General Reimbursable Expenses Labor fee does includes reimbursable expenses.These expenses include airfare,hotel,car rentals,transfers,and a per diem for travel;local travel;reproduction of documents including transparencies;photography;long distance telecommunications; ' shipping,postage,messenger or courier service charges;any sales,usage,occupation,service or similar taxes;purchase of maps,reports,publications (other than those specified as special printing)and similar documents;supplies and materials;and other similar expenses. Other Budget and Schedule Assumptions • Timely and thorough review of materials,plan drafts and other Owner/City/Client review is required and provided in a clear, consolidated format. • Professional services requested outside this scope of work,additional meetings,or extension of schedule shall be provided as an additional services to this agreement either by on a time and expenses basis or by a negotiated fixed fee.West 8 will obtain prior authorization prior to commencing any work beyond the scope of this document. • Invoices shall be issued monthly and shall be payable within 10 days of the invoice date.West 8 reserves the right to stop work should payment be delayed. • Suspension of work for more than 30 days may result in additional services. REQUEST FOR AUTHORIZATION Thank you for your consideration of this request for this proposal.Should you have any questions,do not hesitate to contact West 8.If this request meets your approval,please provide an authorized signature below. Signature Date Name Authorized to Execute this Agreement on behalf of Fentress Architects