Loading...
395_836_95 CMB 5-13-2020City of Miami Beach Commission Update May 13, 2020 2 This PowerPoint presentation was prepared by the Florida Department of Transportation (FDOT) staff and has been made available to the public as part of public records access. Any dissemination of this presentation by anyone or entity other than FDOT staff is not official. Any questions can be sent to FDOT- D6PIO@dot.state.fl.us. This presentation may not be altered. * This schedule does not reflect days added to the contract for holidays, weather days or special events 3 UPCOMING & ONGOING CONSTRUCTION ACTIVITIES •Contractor completed concrete pavement replacement of the three inside southbound I-95 lanes from NW 29 Street to south of NW 20 Street on Sunday, May 3. •Contractor implemented continuous lane closures on northbound I-95 to complete the concrete pavement replacement of the lanes adjacent to the median from NW 20 Street to NW 29 Street. •The continuous lane closures will expedite the concrete replacement phase of the project by at least four weeks. * This schedule does not reflect days added to the contract for holidays, weather days or special events 4 ONGOING LANE CLOSURES THREE MONTH LOOK AHEAD ANTICIPATED LANE CLOSURES ON THE I-95 CORRIDOR: •Nighttime lane/ramp closure along I-95 between NW 8 Street and NW 29 Street •Closure hours have been adjusted based on current traffic conditions to 8 p.m. until 8 a.m. •Continuous lane closures (24/7) for extended periods of up to three to four weeks are planned for northbound I-95 5 •Traffic shifted on westbound SR 836 from the Miami River to east of NW 17 Avenue to the left side of the roadway •Traffic shifted on eastbound SR 836 from NW 17 Avenue to the Miami River to the right side of the roadway UPCOMING & ONGOING CONSTRUCTION ACTIVITIES 6 •Contractor implemented a continuous closure of the outside eastbound SR 836 lane to expedite the replacement of the concrete pavement with asphalt pavement •Demolition of median area on SR 836 has started at NW 12 Avenue and will be moving to the west over the Miami River •Contractor has started Auger Cast Pile (ACP) testing program on SR 836 for the foundations of the new double decked section UPCOMING & ONGOING CONSTRUCTION ACTIVITIES SR 836 UPCOMING CONSTRUCTION ACTIVITIES 7 ANTICIPATED LANE CLOSURES ON SR 836 CORRIDOR: •Single and double lane/ramp closures along eastbound and westbound SR 836 •Arterial roads under SR 836 •Closure hours have been adjusted based on current traffic conditions to 8 p.m. until 8 a.m. •Continuous lane closures (24/7) are being implemented along SR 836 ONGOING LANE CLOSURES THREE MONTH LOOK AHEAD SR 836 UPCOMING CONSTRUCTION ACTIVITIES 8 •Construction of the center signature bridge foundations (Ongoing) •Construction of westbound outside, local road bridge foundations (Ongoing) •Demolition of portions of existing eastbound I-395 to allow for the construction of new bridge foundations (Ongoing) UPCOMING & ONGOING CONSTRUCTION ACTIVITIES SR 836 UPCOMING CONSTRUCTION ACTIVITIES 9 UPCOMING & ONGOING CONSTRUCTION ACTIVITIES The westbound I-395 ramp to northbound I-95 has been reduced from two lanes to one lane The reduction in lanes is necessary to reconstruct the section of I-95 where the eastbound SR 836 ramp and westbound I-395 ramp join I-95 The lane reduction is expected to be in place for approximately 18 months * This schedule does not reflect days added to the contract for holidays, weather days or special events 10 UPCOMING & ONGOING CONSTRUCTION ACTIVITIES •Westbound MacArthur Causeway Ramp lane to Biscayne Boulevard has been shifted to the left to allow for the construction of a new retaining wall on the right side Only one travel lane is available on the ramp from the MacArthur Causeway to North Bayshore Drive * This schedule does not reflect days added to the contract for holidays, weather days or special events 11 UPCOMING & ONGOING CONSTRUCTION ACTIVITIES Traffic shift on Biscayne Boulevard from NE 13 Street to NE 11 Terrace. There will be three NB Lanes (two through lanes and one left turn lane onto NE 13 Street) and three SB Lanes (two through lanes and one left turn lane onto EB MacArthur Causeway). Close Bayshore loop ramp to EB MacArthur Causeway (June 2020) 1 1 2 2 SR 836 UPCOMING CONSTRUCTION ACTIVITIES 12 ANTICIPATED NIGHTTIME LANE CLOSURES ON I-395 CORRIDOR: •Lane closures along eastbound and westbound I-395 •Lane closures along Biscayne Boulevard and other arterial roadways adjacent to I-395 •I-395 to I-95 ramp closures •Closure hours have been adjusted based on current traffic conditions to 8 p.m. until 8 a.m. ONGOING LANE CLOSURES THREE MONTH LOOK AHEAD 13 COMMUNITY OUTREACH PROJECT WEBSITE •www.i-395miami.com •Sign-up for project alerts/updates Lane closure information Upcoming construction activities Presentations •Calendar of events OUTREACH OFFICE IN THE OVERTOWN COMMUNITY •1035 NW 3 Avenue, Miami, Florida 33136 (CLOSED AT THIS TIME) STAKEHOLDER MEETINGS •Stakeholder meetings will be held virtually until further notice, Date TBD. 786-280-0983 OGonzalez@mrgmiami.com Contact: Oscar Gonzalez www.i-395miami.com THANK YOU! 14