Loading...
2003-25372 Reso RESOLUTION NO. 2003-25372 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, RATIFYING A CONTRACT IN THE AMOUNT OF $56,305, WITH FIRE CONTROLS, INC., FOR THE INSTALLATION OF A FIRE ALARM SYSTEM IN THE BYRON CARLYLE THEATER. WHEREAS, during the programming and design of the interior space of the Byron Carlyle Theater, it was determined by the Fire Department that the occupancy requirements of the building exceeded 300 persons and required the installation of a fire alarm system under the Florida Building Code; and WHEREAS, the Mayor and City Commission, at its November 28, 2001 Commission meeting, adopted Resolution No. 2001-24677, which authorized the Property Management Director to serve as the Certified General Contractor for the renovations of the Byron Carlyle Theater; and WHEREAS, the Property Management Director exercised the authority given to him by the City Manager and City Commission, and retained a certified fire alarm system engineer to design and provide the required and sealed construction documents for the bid and permit requirements necessary to install a fire alarm system in the Byron Carlyle Theater; and WHEREAS, after receiving the construction documents, four certified fire alarm contractors were contacted to provide quotes for the scope of work of which three provided bids for the project; and WHEREAS, the Property Management Director, after reviewing the bids, checking references, licensing, and insurance requirements determined that Fire Controls, Inc. provided the lowest responsive responsible bid for the work; and WHEREAS, a contract with Fire Controls, Inc. in the amount of $56,305, was prepared and form approved by the Legal Department, and executed by the Mayor and City Clerk for the installation of a fire alarm system in the Byron Carlyle Theater; and WHEREAS, as required by Resolution No. 2001-24677, the Administration herein requests that the Mayor and City Commission ratify the aforestated contract which is deemed necessary to continue the work on the Byron Carlyle Theater. / NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby ratify a contract, in the amount of $56,305, to Fire Controls, Inc. for the installation of a fire alarm system in the Byron Carlyle Theater. PASSED and ADOPTED this ,2003. ~n~~ CITY CLERK APPlOYED AS 10 fORM & lANGUAGE & FOR EXECUTION dt&,1!f!:!s. Ir)- J-- ~ NIotntIt ~,. CITY OF ""IAMI BEACH COMMISSION ITEM SUMMARY ~ ~ Condensed Title: Ratification of a contract to Fire Controls, Inc., in the amount of $56,305, for the installation of a fire alarm system in the Byron Carlyle Theater. Issue: Shall the City Commission ratify a contract, in the amount of $56,305, for the installation of a fire alarm system in the Byron Carlyle Theater? Item SummarY/Recommendation: In accordance with Resolution No. 2001-24677 adopted by the City Commission on November 28U1, 2001 the Administration, through its Property Management Director, is providing General Contracting services including bidding, the award of contracts for work, and change orders on the Byron Carlyle Theater. Under the provisions of the Resolution, contracts exceeding $25,000 must be brought to the City Commission for Ratification. After a bid process that used specifications that are specific to the needs of the Byron Carlyle Theater, Fire Controls, Inc. was the lowest responsive responsible bidder for the scope of work required to meet Fire and Building Code requirements in the facility. The Administration recommends that the Mayor and City Commission ratify the contract with Fire Controls, Inc. in the amount of $56,305, for the installation of a fire alarm system in the Byron Carlyle Theater. Advisory Board Recommendation: I N/A Financial Information: Amount to be expended: Source of Amount Account Approved Funds: 1 $56,305 # 301.2316.000676 IF~J 2 City Appropriated Funds 3 4 Total $56,305 City Clerk's Office Legislative Tracking: I Si City Manager AGENDA ITEM DATE ~1AL IO~/5-/)J CITY OF MIAMI B'EACH CITY HALL 1700 CONVENTION CENTER DRIVE, MIAMI BEACH, FLORIDA 33139 http://ci,miami -beach.fl, us COMMISSION MEMORANDUM DATE: October 15, 2003 SUBJECT: Mayor David Dermer and Members of the City Commission Jorge M. Gonzalez , .A~ City Manager OI'--tJ A RESOLUTION OF THE MAYOR AND MEMBERS OF THE CITY COMMISSION OF THE CITY OF MIAMI BEACH, RATIFYING A CONTRACT IN THE AMOUNT OF $56,305, TO FIRE CONTROLS, INC., FOR THE INSTALLATION OF A FIRE ALARM SYSTEM IN THE BYRON CARLYLE THEATER. TO: FROM: ADMINISTRATION RECOMMENDATION Adopt the resolution. ANALYSIS During the programming and design of the interior space of the Byron Carlyle Theater, it was determined by the Fire Department and by Fire Code that the occupancy load levels of the performing arts space and the facility exceeded the 300 person limits, which requires the installation of a fire alarm system in the entire building. The Mayor and City Commission, at the November 28, 2001 Commission meeting, adopted Resolution No. 2001-24677, which authorized the Property Management Director to serve as the Certified General Contractor for the renovations of the Byron Carlyle Theater. The Property Management Director exercised the authority given to him by the City Manager and City Commission, and retained a certified fire alarm system engineer to provide the required and sealed construction documents necessary to permit and bid the project. After receiving the construction documents, four certified fire alarm system contractors were contacted to provide quotes for the fire alarm system installation work. Of the four firms that received bid packages, three submitted quotes for the project. After reviewing the quotes, and after checking background references, plus licensing, and 1 Insurance requirements, the Property Management Director determined that Fire Controls, Inc., was the lowest responsive responsible bidder on the project. A contract was prepared with Fire Controls, Inc., in the amount of $56,305, and was reviewed and form approved by the Legal Department on September 17, 2003. The contract was signed by the contractor and executed by the Mayor and City Clerk as required. The Administration recommends that the Mayor and Members of the City Commission of The City of Miami Beach ratify the Property Management Director's contract to Fire Controls, Inc., in the amount of $56,305, for the installation of a fire alarm system in the Byron Carlyle Theater. JMG/RCM/FB/BAJ C:1My FileslCommemolByronRatifyFire AlarmMemo.DOC 2 z o in ~ o I- Z W ::E W ~ ~~W.., >1-0::0 I-I;:;~'i' 0::....111..,1- ~Z::l:~W OQI-q~ o::~Wc(U) a....J>!>z ::I: ...L.J ,. 0 CJc(o::Z- c(1-C(0~ IIIU)CJ-..J I113!:Z~::) :iij::E 0 I-!;l c(Wo::Oj:: il-~::) ~ a ~U) ~~ u:5 c( W 0:: u::: III U =,.5 a:- ., e '81 CJ>- U) ~CJ a=Z ::) -. o~ wo:: U)I- o~ ...... o::w illl ~Ii ....,..':. <-'~~; .. ~O _Z 0::-:' ::)U) OW wO U)> 1-0:: OW c(U) I . o 3!: ~~ _0 11.0:: I- Z o o . ~ . Z o i= a.. a= o fZ o City of Miami Beach lQ Procurement Division 1700 Convention Center Drive Miami Beach FL 331 39 ......... 'PURCHASE ORDER I CHANGE ORDER MAIL INVOICE TO: "SHIP TO" ADDRESS WITH COpy TO: CITY OF MIAMI BEACH, ACCOUNTS PA YABLE, 1700 CONVENTION CENTER DRIVE, MIAMI BEACH, FLORIDA 33139. v ~ FIRE CONTROLS, INC. o 5601 N.W. 9TH AVENUE o FT. LAUDERDALE, FL 33309 R I CHECK ALTERNATE SHIP TO LOCATIONS: S H I P POISO NUMBER PAGE SO-000020939 1 OF 1 DATE ORDERED I DATE REQUIRED 09/25/2003 09/25/2003 DESCRIPTION AREA FOR ADDmONAL OR Telephone: (305) 673-7490 Fax: (305) 673-7851 I VENDOR 10# 025487 PROPERTY MANAGEMENT 1245 MICHIGAN AVENUE MIAMI BEACH, FL 33139 T o ISSUED BY: MARTA FERNANDEZ RUBIO REQUESTING DEPARTMENT PROPERTY MANAGEMENT PHONE. (305) 673-7490 TERMS NET 30 DAYS F.O.B. DESTINATION SHIP VIA BEST WAY DEPARTMENT CONTACT: BRAD JUDD/VIVIANA ALEMANY - TEL. 305-673-7630 EXT. 2984/2968 QUANTITY UNIT DESCRIPTION UNIT PRICE EXTENDED PRICE o FIRE SLARM SYSTEM-BYRON CARLYLE -ACCT# 301-2316-000676 STANDING ORDER FOR FURNISHING & INSTALLING FIRE ALARM SYSTEM FOR THE BYRON CARLYLE THEATRE. CONTRACTOR IS RESPONSIBLE FOR SIGNED & SEALED ENGINEERING DRAWINGS & BLOG PERMIT PROCESS. SCOPE OF WORK AS PER QUOTATION VA-QT03-003. PURCHASE AUTHORITY: RESOLUTION NO. 2001-24677. CONTRACTS OVER $25,000 TO BE RATIFIED BY THE MAYOR AND CITY COMMISSION. 56,304.64 '" c 0 .~ '" W ""n ~- 0 ,.J.J -=. -~ C'":l ...; - ;ro -l . "j ::-, I .-, ;. ... :.. :=.' N ~~ C";" . ~ 1 :::~ -u tT':'~ "':C ':;::f". -1:~ N fT1 o~ CJ -- ~ V> -.I 0 z 56,304.64 Procurement Director: UST APPEAR ON ALL INVOICES AND SHIPPI TOTAL: YOU MUST ALSO STATE YOUR U.S. TREASURY DEPT. TAX EXEMPTION UNDER REG. NO. F59-6000372, STATE OF FLORIDA TAX EXEMPTION CERTIFICATE 23-09- 329671-54C Original Budget Expenditures Revised Budget CONSTRUCTION EXPENDITURES TO DATE March 26, 2003 to Date October 15, 2003 . Completion 01 Phase I - renovation of 3,400 sf of lobby space into office space 115,967 115,967 . Partial Roof and HV AC Replacement 467,346 467,346 . Commencement of Phase II (lobby and theater space) 5,749 296,735 TOTAL PHASE I AND PHASE II CONSTRUCTION COSTS TO DATE $ 589,062.00 $ 860,048.00 $ 569,062 ANTICIPATED COSTS FOR THE REMAINDER OF PHASE II Estimates for requirements imposed by the building and fire codes: . Fire Sprinkler System 100,000 89,750 Required for the entire building base on occupancy. Quote provided by a licensed fire sprinkler contractor. . Fire Alarm System 30,000 56,305 Required by Fire Code lor the entire building. . ADA Wheelchair Lift (Stairway to mezzanine) 26,000 26,000 Required to provide ADA "path of travel" to the mezzanine area. . Acoustical Ceilings (Lobby and Theater areas) 38,000 21,000 Estimated @ $5.00 per square foot x 7600 sq. ft. . Floor Finish (Lobby and Theater) 22,500 22,500 Estimated @ $25 per square Yard x 900 sq. yd. . Concrete Work 30,000 31,736 Lobby floors, concrete stairs, mezzanine barrier wall extensions, and saw cut and fill for electrical lines in the Theater floor. . Sanitary Sewer Lift Station to repair the existing lift station 27,000 - $ 273,500 $ 247,291 Estimates for additional costs for completion of Phase II: . Electrical/Lighting/Fixtures (Not including Stage lighting) 70,000 70,000 . Plumbing/Fixtures (Existing and new ADA Unisex restroom) 25,000 20,000 . HVAC (Installation and existing duct cleaning) 25,000 20,000 . Carpentry 75,000 65,000 (concrete 10nming, interior walls, doors, cabinetry, ceramic tile, wall treatments, trim drywall and finishing etc.) . Paint 15,000 12,000 . ADA Compliant Entry Doors and Handrails 8,000 8,000 . Other interior Finishes 19,438 74,396 $ 237,438 $ 269,396 TOTAL COSTS FOR PHASE I $ 510,938 $ 510,936 $ 510,936 TOTAL CONSTRUCTION COSTS (PHASE I + PHASE II) $ 1,100,000.00 $ 680,046.00 $ 1,100,000.00 AVAILABLE FUNDS FOR BALANCE OF CONSTRUCTION, OPERATIONAL EQUIPMENT, AND THE PURCHASE OF FURNITURE, FIXTURES, AND FINISHES, ETC. $ 638,596.00 $ 856,548.00 $ 636,596 TOTAL FUNDING OBTAINED TO DATE FOR RENOVATIONS $ 1,738,596 $ 1,738,596 $ 1,738,596 BYRON.CARL YLE CONSTRUCTION BUD"GET 1 - $89,750 - Falcon Fire Protection, Inc. 2 - $43,450 - Lango Equipment Service (demolition services) 3 - $134,430 - Sound Concept, Inc. (Theater Stage) 4 - Sanitary Sewer Lift Station is now categorized as a maintenance repair and removed fnom construction cost, as reflected in memorandum. 5 - Acoustical Ceilings were originally estimated at $5.00/sf but preliminary quote has been obtained for a cost of $21 ,000. F:\cmgt\$ALL\CHRIST/NIB-C Funding-Costs FinanceCffywidel0-15-03.xls Cons/Cost - Phesell