Resolution 2020-31290 RESOLUTION NO. 2020-31290 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE CITY MANAGER TO NEGOTIATE AND EXECUTE CHANGE ORDER NO. 1 TO THE CONSTRUCTION CONTRACT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND J.R.T. CONSTRUCTION CO., FOR CONSTRUCTION SERVICES AT MIDDLE BEACH RECREATIONAL CORRIDOR PHASE III PROJECT, TO INCLUDE ADDITIONAL CONSTRUCTION SERVICES ASSOCIATED WITH THE INSTALLATION OF INFRASTRUCTURE FOR SECURITY CAMERAS INCLUDING, BUT NOT LIMITED TO, THE SUPPLY AND INSTALLATION OF HANDHOLES, ELECTRICAL SERVICE PANELS AND CAMERA POLES, RESULTING IN AN INCREASE OF $382,548.15 WHICH INCLUDES AN INCREASE IN THE OWNER'S CONTINGENCY BY THE AMOUNT OF$34,777.10, OR 10%OF THE CHANGE ORDER AMOUNT,INCREASING THE TOTAL VALUE OF THE CONTRACT TO $9,824,349.75, AND FURTHER PROVIDING THE CONTRACTOR A TIME EXTENSION OF SIXTY (60) CALENDAR DAYS TO ACCOMMODATE THE CHANGE IN SCOPE. WHEREAS, on July 31, 2019, the City Commission awarded the contract in the amount of$9,441,801.60 for construction services for the Middle Beach Recreational Corridor Phase III ("Project") to. J.R.T. Construction Co. ("Contractor") pursuant to ITB2019-002-DF, AND Construction began on November 18, 2019 and is scheduled for completion in Spring of 2021; and WHEREAS, this Project consists of the construction of an on-grade ADA compliant pedestrian paver walkway, with bollard lights, landscaping and irrigation, and the path will run north from approximately 24th Street to 46th Street; and WHEREAS, exotic dune vegetation will be removed and replaced with dune enhancements such as native dune vegetation species and beach compatible dune fill will be provided for the landscaping; and WHEREAS, the proposed path lighting will meet Florida Fish and Wildlife Commission's marine turtle nesting requirements; and WHEREAS, in an effort to provide increased security along the beachwalk, and in order to minimize impact to newly installed improvements, the Miami Beach Police Department ("MBPD")has requested construction of the necessary infrastructure which will allow for the future installation of security cameras along the path,and MBPD hired a consultant to design the security camera infrastructure; and WHEREAS, initially the design of the security cameras underground conduits was provided by MBPD; and WHEREAS, City staff requested that the Contractor provide a proposal to supply and install the conduits, and in order to avoid any delays to the MBRC3 project, and incur any additional costs for demolition and restoration during the future security cameras improvements, City staff and the project engineer reviewed the proposal submitted by the contractor in the amount of$143,295.33 and approved the work under the project contingency; and WHEREAS, while the empty conduit was being installed, MBPD was able to finalize the security camera design. J.R.T. Construction Co was then able to provide a proposal, attached as Exhibit A to the Memorandum accompanying this Resolution, for the remaining infrastructure work , including handholes, electrical service panels to supply power for security cameras and camera poles; and WHEREAS,this Change Order No. 1 in the amount of$347,771.05, plus$34,777.10(10% contingency) for a total of $382,548.15, includes the remaining security camera infrastructure; and WHEREAS, the cost was reviewed by the project engineer and MBPD and was found to be fair and reasonable; and WHEREAS, additionally, Change Order No 1. Provides the Contractor a time extension of sixty(60)calendar days to accommodate the change in scope; and WHEREAS,the cost associated with the installation of the infrastructure will utilize current allocated funding for the security camera project, managed by the Miami Beach Police Department; and WHEREAS, the total amount of the contract, including this change order is $9,824,349.75; and WHEREAS, the Administration recommends that the City Commission approve the resolution; and NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, approving and authorizing the City Manager to negotiate and execute Change Order No. 1 to the construction contract between the City of Miami Beach, Florida and J.R.T. Construction Co., for construction services at Middle Beach Recreational Corridor Phase III project, to include additional construction services associated with the installation of infrastructure for security cameras including, but not limited to, the supply and installation of handholes, electrical service panels and camera poles, resulting in an increase of$382,548.15, which includes an increase in the Owner's contingency in the amount of$34,777.10, or 10% of the change order amount, increasing the total value of the contract to $9,824,349.75, and further providing the Contractor a time extension of sixty (60) calendar days to accommodate the change in scope. PASSED and ADOPTED this a Y day of Ttihe , 2020. i<2-4, 1-----_,_ Dan Gelber, Mayor (....g ATTEST: / Z Rea/E. Granado, Ci APPROVED AS TO FORM 8 LANGUAGE y lerk & FOR EXECUTION .1 e CR .'*::,1'8 'S•I',„ City Attorney ` Oate ' 'IPS ORP`ORATED: 5 Resolutions-C7 C MIAMI BEACH COMMISSION MEMORANDUM TO: Honorable Mayor and Members of the City Commission FROM: Jimmy L. Morales, City Manager DATE: June 24,2020 SUBJECT:A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA,APPROVING AND AUTHORIZING THE CITY MANAGER TO NEGOTIATE AND EXECUTE CHANGE ORDER NO. 1 TO THE CONSTRUCTION CONTRACT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND J.R.T. CONSTRUCTION CO., FOR CONSTRUCTION SERVICES AT MIDDLE BEACH RECREATIONAL CORRIDOR PHASE III (MBRC3), TO INCLUDE ADDITIONAL CONSTRUCTION SERVICES ASSOCIATED WITH THE INSTALLATION OF INFRASTRUCTURE FOR SECURITY CAMERAS INCLUDING, BUT NOT LIMITED TO, THE SUPPLY AND INSTALLATION OF HANDHOLES, ELECTRICAL SERVICE PANELS AND CAMERA POLES, RESULTING IN AN INCREASE OF $347,771.05, AND INCREASING THE OWNER'S CONTINGENCY BY THE AMOUNT OF $34,777.10, OR 10% OF THE CHANGE ORDER AMOUNT FOR A TOTAL CHANGE ORDER AMOUNT OF $382,548.15, AND PROVIDING THE CONTRACTOR A TIME EXTENSION OF SIXTY (60) CALENDAR DAYS TO ACCOMMODATE THE CHANGE IN SCOPE, FUNDING FROM PREVIOUSLY APPROPRIATED FUNDS FOR SECURITY CAMERAS ON BEACHWALK 23 TO 46 STREET. BACKGROUND/HISTORY On July 31, 2019, the City Commission awarded the contract in the amount of $9,441,801.60 for construction services for the Middle Beach Recreational Corridor Phase III to J.R.T. Construction Co. (Contractor) pursuant to ITB2019-002-DF. Construction began oh November 18,2019 and is scheduled for completion in Spring of 2021. This project consists of the construction of an on-grade ADA compliant pedestrian paver walkway,with bollard lights, landscaping and irrigation. The path will run north from approximately 24th Street to 46th Street. Exotic dune vegetation will be removed and replaced with dune enhancements such as native dune vegetation species and beach compatible dune fill will be provided for the landscaping. The proposed path lighting will meet Florida Fish and Wildlife Commission's marine turtle nesting requirements. ANALYSIS Page 245 of 2046 In an effort to provide increased security along the beachwalk, and in order to minimize impact to newly installed improvements, the Miami Beach Police Department (MBPD) has requested construction of the necessary infrastructure which will allow for the future installation of security cameras alo ig the path. MBPD hired a consultant to design the security camera infrastructure. Initially the d:sign of the security cameras underground conduits was provided by MBPD. City staff reques+3d that the Contractor provide a proposal to supply and install the conduits. In order to avoid any delays to the MBRC3 project, and incur any additional costs for demolition and restoration during the future security cameras improvements, city staff and the project engineer reviewed the proposal submitted by the contractor in the amount of $143,295.33 and approved the work under the project contingency. While the empty conduit was being installed, MBPD was able to finalize the security camera design. J.R.T. Construction Co was then able to provide a proposal (Exhibit A)for the remaining infrastructure work including handholes, electrical service panels to supply power for security cameras and camera poles. Change Order No. 1 in the amount of $347,771.05 plus $34,777.10 (10% contingency) for a total of $382,548.15, includes the remaining security camera infrastructure. The cost was reviewed by the project engineer and MBPD and was found to be fair and reasonable. Additionally, the Contractor shall be granted a time extension of sixty (60) calendar days to accommodate the change in scope. The cost associated with the installation of the infrastructure will utilize current allocated funding for the security camera project, managed by the Miami Beach Police Department. The total amount of the contract including this change order is $9,824,349.75. Account(s) 306-1110- Amount(s) $382,548.15 000674-20- 410-596-00- 00-00-21620 CONCLUSION The Administration recommends adopting the Resolution. Applicable Area Middle Beach Is this a"Residents Right Does this item utilize G.O. to Know" item, pursuant to Bond Funds? City Code Section 2-14? Yes Yes Strategic Connection Neighborhoods - Enhance the beautification, physical appearance and cleanliness of neighborhoods. Legislative Tracking Page 246 of 2046 Capital Improvement Projects ATTACHMENTS: Description Exhibit A a Resolution Page 247 of 2046 • Attachment B J,R.T. CONSTRUCTION, CO. G E N E R A L C O N T R A C T O R 3050 N.W. 77 Court, Doral, FL 33122 • Tel: 305-557-9911 • Fax: 305-557-9922 May 4, 2020 City of Miami Beach-Office of Capital Improvement Projects Sent via E-Mail 1700 Convention Center Dr. To: PaolaVeoaCadmiamibeachfl.gov Miami Beach, FL 33139 (29)Total Pages including attachments Re: Middle Beach Recreational Corridor, Phase III-ITB No.2019-002-DF Subj.: CPR No. 6 - Additional CCTV Work Infrastructure Work within Project Limits (excluding conduits) Attn: Mrs. Paola Vega- Project Coordinator Dear Paola, We herewith submit this Cost Proposal Request (CPR) in the add amount of $347,771.05 for the additional work required to complete the CCTV work requested by the City of Miami Beach -from 24th to 46th St. - per the attached sketches created by JRT (approvals by the City also attached). The revised sketches were based off the drawings received via the attached email on February 24, 2020, the additional 2" conduit per the attached eMail received on March 31st, 2020, and a field meeting with MBPD and their design team on April 22nd, 2020. The CCTV Work shown in the areas within 29th and 30th St, between 32nd and 361h, and beyond the end of the beachwalk on the north side at 45th,are NOT included in this CPR. This proposal includes the materials, labor, equipment, and machinery required to install the electrical equipment racks,field panels&disconnects at the service points, power connections to the new service panels at 27th, 30th, and 43rd, puliboxes, concrete bases & their respective poles, and electrical wiring. This proposal does not include trench compaction, any conduit and pull string work, the CCTV equipment and cameras, material and installation of any low voltage and/or communications cabling, and restoration of new work performed that may need to be restored as a result of work performed pursuant to this CPR. Work by J.R.T. Construction, Co. Labor, Material& Equipment(See attached breakdown) $ 8,125.00 10% Overhead&Profit on Self-Performed Work $ 812.50 7.5% Overhead and Profit on Subcontractor Work $ 23,639.55 Subtotal $ 32,577.05 Work by F&L Fire&Electrical System. Inc. Labor, Material &Equipment $ 315,194.00 10% Overhead and Profit $ INCL. Subtotal (see attached proposal) $ 315,194.00 Total of this Change Order Request $ 347,771.05 The Contract Time will be increased by To Be Determined At this time JRT cannot determine the impact the additional work herein will cause to the project schedule and Contract Time, because JRT does not know how long the Owner will take to issue a formal approval to the Contingency Draw (for this additional work). As of the date of this CPR, the CCTV underground work is in progress per CPR No. 3R5 and per directives issued by the Owner for the additional work. As soon as JRT determines the impact this additional work causes to the project • Page 248 of 2046 Page 1 of 2 CPR No.6—Complete CCN Work per the project schedule, JRT will proceed to submit a separate Request for Change Order for an extension to the Contract Time, should the work herein cause an impact to the Contract Time. Subsequent Delays: This proposal must be accepted within 10 days of the above date, after which time it may be subject to escalation. If not accepted within the stated time frame this proposal will automatically expire. Please proceed immediately and issue a written change order accepting this proposal so that we can proceed with this work. No work will be performed without an official executed change order to our contract. This proposed change is limited to the work described herein,and does not include any other work not specifically listed,or any amounts for additional charges in the sequence of the work, delays, disruptions, rescheduling, extended overhead, acceleration, unforeseen conditions, overtime and/or impact costs. JRT reserves the right to make any additional claims for any and all those related items above mentioned, including any items we might have omitted due to the complexity of this revision or due to unforeseen conditions prior to any final settlement of this contract. Also we reserve the right to claim for additional time for this change order work. If you have any questions, feel free to contact me at any time. Sincerely yours, J.-.T. onstruction, Co. • os- •�JJ �ana Proj- anager Page 249 of 2046 Page 2 of 2 CPR No.6—Complete CCTV Work 1411414 ' . . . R G E NE A L C O N T R A C T O R. • 3050 N.W. 77 Court, Doral, FL 33122 • Tel: 305-557-9911 • Fax: 305-557-9922 CPR NO.:6 DATE:May 4,2020 PROJECT NAME: MBRC-Middle Beach Recreational Corridor,Phase 3 PROJECT ADDRESS:24th to 46th St DESCRIPTION OF WORK:Additional CCTV Work Infrastructure Work within Project Limits(excluding conduits) 1 Project Supervision&Coordination 125 HRS. @ $65.00 /HR $ 8,125.00 2 Field Investigations&Exploratory Work 0 HRS. @ $65.00 IHR $ - 3 Estimating 0 HRS. @ $65,00 IHR • $ - 4 Project Schedule Update for Change Order Work 0 HRS. @ $65.00 MR $ - 5 As-built Revisions for Change Order Work 0 HRS. @ $65.00 /HR $ - 6 7 8 9 10 11 12 13 14 16 Labor Costs Subtotal $ 8,125.00 10%Overhead and Profit $ 812.50 Subtotal for Labor Costs $ 6,937.50 DIRECT MATERIAL COSTS 16 @ /EA $ - 17 @ /EA $ - 18 Fuel for Equipment 0 US @ /EA $ - 19 Sales Tax @ 7% 20 Pick-up&Delivery of Material, 0 US , @ /EA $ - Material Costs Subtotal $ - 10%Overhead and Profit $ - Subtotal for Material Costs $ - DIRECT EQUIPMENT COSTS 21 /EA $ - 22 23 24 Pick-up&Delivery of Equipment EA @ /EA $ - 25 Insurance @ 14% @ /EA 26 Sales Tax @ 7% @ /EA Equipment Costs Subtotal $ - 10%Overhead and Profit $ - Subtotal for Equipment Costs $ - VENDOR I SUBCONTRACTOR COST 27 F&L Fire&Electrical System,Inc.(See Attached Breakdown) $ 315,194,00 28 29 Subcontractor Cost Subtotal $ 315,194.00 10%Subcontractor Overhead and Profit INCL Subtotal for Subcontractor Work $ 315,194.00 7.5%Contractor Overhead and Profit on Subcontractor Work $ 23,639.55 Total.for Subcontracted Work $ 338,833.56 CREDITS 30 I I l I I Credit Costs $ - Total Costs and Credits(sum of items in bold&in highlight above),$ 347,771.05 Page 1 of 1 Page 250 of 2046 Revision Date:5/4/2020 FAL Fire and Electrical System , Inc . 2271 West 80 Street A2 Hialeah, Florida 33016 Phone: 786-267-0684 m@flfelectric.com State License:EC 13007054 Proposal: The following is a construction estimate for electrical work presented to: J.R.T. Construction, co. 8857 NW 117 ST Hialeah Gardens, FL 33018 Project Address: MBRC-Phase HI City of Miami Beach, FL CCTV work Conduit Breakdown From 24th Street to 29th Street (INCLUDED) From 30th Street to 32nd Street (INCLUDED) From 36th Street to 46th Street (INCLUDED) From 29th Street to 30th Street (NOT INCLUDED) From 32nd Street to 36th Street (NOT INCLUDED) • Provide and install #6 cable. (Section from 24th Street to 29th Street, Section from 30th Street to 32nd Street and Section from 36th Street to 46th Street) Materials: Description Qty Net Price Total materials - Cable#6 9,660' $0.65 $6,279 ■ Provide and install #2cable. (Section from 36thth Street to 46th Street) Materials: Description Qty Net Price Total materials - Cable#2 14,040' $1 .14 $16,006 • Provide and install electrical equipment racks support Nema 4X (Section from 24th Street to 29th Street, Section from 30th Street to 32nd Street and Section from 36th Street to 46th Street) Materials: Description Qty Net Price Total materials - Rack 10 $1,994 $19,940 Page 251 of 2046 • Provide and install field Panels Nema 4X (Section from 24th Street to 29th Street, Section from 30th Street to 32nd Street and Section from 36th Street to 46th Street) Materials: Description Qty Net Price Total materials - Field Panel 10 $2,275 $22,750 ■ Provide and install Stainless Steel 2pole Disconnects 4X (Section from 24th Street to 29th Street, Section from 30th Street to 32nd Street and Section from 36th Street to 46th Street) Materials: Description Qty Net Price Total materials - Disconnects 10 $965 $9,650 ■ Provide and install puilboxes (Section from 24th St to 29th St, Section from 30th St to 32nd St, Section from 36th St to 46th St) 13x24x24 for Camera, 13x24x18 for Electrical, 17x30x24 and 13x24x18 for Service Point, 24x36x24 for Street End Materials: Description Qty Net Price Total materials - Pull Boxes 97 $831 .95 $80,699 • Provide and install CCTV poles - Windloads calculations & freight included (Section from 24th Street to 29th Street, Section from 30th Street to 32nd Street and Section from 36th Street to 46th Street) Materials: Description Qty Net Price Total materials - CCTV poles 26 $1 ,198 $31,148 ■ Provide and install concrete bases - Windload calculations & freight included (Section from 24th Street to 29th Street, Section from 30th Street to 32nd Street and Section from 36th Street to 46th Street) Materials: Description Qty Net Price Total materials - Concrete bases 26 $680 $17,680 Page 252 of 2046 General Materials: $204,152 Materials Tax (7%): $14,291 Total Materials: $218,443 Labor: (1 ,388 Hrs @ $45.42): $63,043 Equipment rent (Hydraulic Excavator rock bucket): $5,054 Overhead / Profit (10%): $28,654 Total : $315, 194 Leonid del Castillo (President and Qualifier) Date:04/30/20 Page 253 of 2046 : o 7 g W .4 e µN s O i la iIW II II II SIL. 24 SVC PT 25 SVC PT 26 27 SVC PT 29 2'ELECTRICAL CONDUIT 2'COMM.HH AT SVC POINT TO COMM.HH TO CAMERA POLES -GLUE CAP AT 2"SPARE CONDUIT AT HANDHOLES AT 24th and 29th 2'SPARE,FROM 24th to 29th END OF JOB HHa -PUT STRING UNE IN THE 2'SPARE CONDUIT FOR PUWNG - ----- 3'SERVICE POINT COMM BOX TO SERVICE POINT COMM BOX CAMERA POLE M COMM.HAND HOLE ELEC.HAND HOLE 1.1 END OF JOB HAND HOLE FOR FUTURE CONNECTIONS TO 24 ST&29 ST 1 III SERVICE POINT Page 254 of 2046 5/1/2020 Mail-Jose Arana-Outlook RE:Beach walk Sketch from 24th-29th (Discussed Sketch) Aragunde,Roland <RolandAragunde@miamibeachfl.gov> Thu 4/23/2020 1:20 PM To: Jose Arana<jarana@tarafaconstruction.com> Cc: leovanni Tarafa<jtarafa@tarafaconstruction.com>;Felipe Rodriguez<frodriguez@tarafaconstruction.com>;Leonid del Castillo<leo@flfelectric.com>;Guitian,Ariel <ArielGuitian@miamibeachfl.gov>;Vega,Paola<Pao laVega@miamibeachfl.gov>;hector rodriguez<hector@sfla-elec.com> Jose, This sketch looks great and memorializes what we have discussed.I knew I was forgetting something when we spoke and it was the depths of the boxes.If you can get the telecom boxes in 24"depth,that is what we would prefer with the most important ones of those being the ends(24x36)due to coiling some of the fiber in it.If 18"is all you can get,then we will work with what we have to.The electrical boxes can be the standard depth your using throughout the rest of your project. Will you be laying the conduit for the poles which will go at the ends of the streets(25/26/27)now or coming into the handholes at a later time in the project? Just kind of a reminder. Thank you so much for your time and work on this. Roland MIAMI B EA Roland Aragunde,Detective Technical Operations Unit MIAMI BEACH POLICE DEPARTMENT 1100 Washington Ave,Miami Beach.FL 33139 Tel:305-673-7776,ext.3749 / Fax:T86-394-4829 Days/Hours:Tuesday-Friday.2pm-12am RolandAragunde@ miamibeachfl gpv_ Mission:Prevent crime and enhance public safety. Vision: We aspire to be a world-class agency,which protects our diverse community and serves as a model for character,Innovation and service to meet the challenges of tomorrow. Values:Profession!.Accountable.Honest and Proud. . Otr Daily Goals:Reduce crime and the fear of crime:Partner with the community to solve problems Improve traffic safety:Operate the organization efficiently. From:Jose Arana<jarana@tarafaconstruction.com> Sent:Thursday,April 23,2020 12:48 PM To:hector rodriguez<hector@sfla-elec.com>;Aragunde,Roland<RolandAragunde@miamibeachfl.gov> Cc:Jeovanni Tarafa<jtarafa@tarafaconstruction.com>;Felipe Rodriguez<frodriguez@tarafaconstruction.com>;Leonid del Castillo<leo@flfelectric.com>; Guitian,Ariel<ArielGuitian@miamibeachfl.gov>;Vega,Paola<PaolaVega@miamibeachfl.gov> • Subject Re:Beach walk Sketch from 24th-29th(Discussed Sketch) Folks- Attached please find the sketch,with the changes and comments we discussed moments ago.Please verify so I can remobilize my work for this tomorrow. One last thing,Hector/Roland-I need the depths of the boxes,the 13x24s,the 17x30s,and the added 24x36s.The plans call for the first two at 18". Thanks. Regards, //a...IN) Josd Arana III -Mit Project Manager I.R.T.Construction,Co. 3050 NW 77th Ct.,Doral,FL 331Z2 C 305 331 1524;F 305.557 9972 0.305.557.9911,Ext.1015 Jnse Arana , Prow(inlr(t rvlan:,grr i 1tL'.=Ongirt,rbpn I ;rl').i31.1'0,1 The information contained in this email message is confidential and/or privileged,and intended only for review by the individual or entity named above.If the reader of this message is not the Intended recipient,you are hereby notified that any review,dissemination,distribution,or copying of this communication or the information contained herein is strictly prohibited. If you have received this communication in error,please immediately notify the sender by email(jarana@tarafaconstruction.com),and destroy the original message.Thank you. Page 255 of 2046 haps://outlook,office.com/mail/search/id/AAMkADQxMDU4NmJhLTFiNTUtNDhiZC04YWRjLWVhYTIjMThjODA4NgBGAAAAAAAEJvemLo0MR51 bnF... 1/4 5/1/2020 Mail-Jose Arana-Outlook From:Jose Arana<jarana@tarafaconstruction.com> Sent:Thursday,April 23,2020 9:34 AM To:hector rodriguez<hector@sfla-elec.com> Cc:Aragunde,Roland<RolandAragunde@miamibeachfl.gov>;Jeovanni Tarafa<jtarafa@tarafaconstruction,com>;Felipe Rodriguez <frodriguez@tarafaconstruction.com>;Leonid del Castillo<Ige@flfelectric-com> Subject:Re:Beach walk Sketch from 24th-29th Hector/Roland- So like the attached,then?I revised it to add the 2"pole to pole in the street end boxes. I still need the following answered: • What handholes/pullboxes the 3"conduit and the 2"spare conduit go into at the service points-the COMMUNICATIONS ones,or a separate one. • The depth of all the pullboxes mentioned in Hector's eMail(the plans say all are 18"deep) I'd need a confirmation that the sketch is OK prior to resuming work,so we're all on the same page. Regards, \ PJosrojee ct Arana Manager "..1"1") j.R.T.Construction,Co. 3050 NW 77th Cl..("oral.FL 33122 C 305 331 1524'F 305 557 9922 0 0.305.557.9911.[XL 1015 ,-,-A.-3r, . Project^,1.:?n,a„rr 1.1 ;c.r-,rr,_i roe: i 3C:+ 331 I'3:,,1 The information contained in this email message is confidential and/or privileged,and intended only for review by the individual or entity named above.If the reader of this message is not the intended recipient,you are hereby notified that any review,dissemination,distribution,or copying of this communication or the Information contained herein is strictly prohibited.,If you have received this communication In error,please immediately notify the sender by email(jarana@tarafaconstruction.com),and destroy the original message. Thank you. From:hector rodriguez<hector@sfla-elec,com> Sent:Wednesday,April 22,2020 4:55 PM To:Jose Arana<jprana@tarafaconstruction.cont> Cc:Aragunde,Roland<RolandAragunde@miamibeachfl.gov>;Jeovanni Tarafa<j1arafa@tarafaconstruclion.com>;Felipe Rodriguez <frodriguezl tarafaconstruction.com>;Leonid del Castillo<leo@flfelectric.com> Subject:Re:Beach walk Sketch from 24th-29th Jose, As for fiber runs,they'll just be at the Service Points. In regards to boxes: Camera locations-13"x 24" Service Point Comm-17"x 30" Service Point Elec-13"x 24" 24th St end&29th-Qty 1 on Each St 24"x 36" -This is going to be a puilbox pass through for all the fiber and a cat 6.It's also going to have 2-2"&1-3"coming in and going out(6 conduits). Electrical run JB-13"x 24" Thanks, ...,.:1r R,odric, - .,,.,:rat South Florida Electrical Cons. 788.299.2337 Direct 305.269.1630 Fax 4234 SW 75th Ave, Miami,FL 33155 On Apr 22,2020,at 4:28 PM,Jose Arana<jarana@tarafaconstruction.cpm>wrote: Alright,Roland- I put together what Hector drew up and combined it with the original plan provided for the area between 24th and 29th,and came up with the attached. Page 256 of 2046 https://outlook.office.corn/mail/search/id/AAMkADQxMDU4NmJhLTRNTUtNOhiZC04YWRXWVhYTIjMThjODA4NgBGAAAAAAAEJvemLo0MR51 bnF... 2/4 5/1/2020 Mail-Jose Arana-Outlook I wanted to show all the pullboxes too,just for clarity-because we'll need more for the electrical runs due to the 250'max between electrical box and electrical box. Also,since my job limits end short of 24th and 29th St,I've put pullboxes/handholes just at the very limits of my job so you can do your future connections at those points. The other question I need answered is what,if any,handholes the 3"conduit and the 2"spare conduit go into,if any.Feel free to use Adobe to draw on this PDF to provide the answer. Please tell me if this OK.Call me if anything.Thanks. Regards, <Outlook-gkhldbyp.jpg»'.r Arana Project M'anag?r I IItI I r 1'.rr:whim i ' '.t 1I. ?.1 The information contained in this email message is confidential and/or privileged,and intended only for review by the individual or entity named above.If the reader of this message is not the intended recipient,you are hereby notified that any review,dissemination,distribution,or copying of this communication or the information contained herein is strictly prohibited. If you have received this communication in error,please immediately notify the sender by email (jaranaiBtarafaconstruction.coml,and destroy the original message.Thank you. From:Aragunde,Roland<RolandAragunde@miamibeachfl.ggv_> Sent:Wednesday,April 22,2020 1:00 PM To:Jose Arana<jarana@tarafaconstruction.com> Subject:Fwd:Beach walk Sketch from 24th-29th Good Afternoon Jose, Please see the below and tell me if this helps. Thank you, Roland MIAMI BEACH Roland Aragunde,Detective Investigations and Technical Support Division MIAMI BEACH POLICE DEPARTMENT 1100 Washington Ave,Miami Beach,FL 33139 Tel:305-673-7776,ext.3749 / Fax:786-394-4829 Ro l a n dAra g u n d e@ m i a m i bea chs.g gv_ Mission: Prevent crime and enhance public safety. Vision: We aspire to be a world-class agency,which protects our diverse community and serves as a model for character,innovation and service to meet the challenges of tomorrow. Values:Professional,Accountable,Honest and Proud. Our Daffy Goals:Reduce crime and the fear of crime;Partner with the community to solve problems;Improve traffic safety;Operate the organization efficiently. Begin forwarded message: From:Hector Rodriguez<hector@sfla-elec.com> Date:April 22,2020 at 12:28:38 PM EDT To:"Aragunde,Roland"<RolandAragundeemiamibeachfl gqy>,"Fernandez,Hector<HectorFernandez@miamibeachtl.gov> Subject:Beach walk Sketch from 24th-29th [THIS MESSAGE COMES FROM AN EXTERNAL EMAIL-USE CAUTION WHEN REPLYING AND OPENING LINKS OR ATTACHMENTS] Guys, Below a conduit layout sketch.Service points and cameras are not in actual location it's just to depict conduit size and where they stub up. Let me know if this helps. Hector Rodriguez Jr. South Florida Electrical Cons. 786.299.2337 Direct 305.269.1630 Fax 4234 SW 75th Ave Miami,FL 33155 Page 257 of 2046 https://outlook.office.corn/mail/search/id/AAMkADQxMDU4NmJhLTFiNTUtNDhiZC04YWRjLWVhYTIjMThjODA4NgBGAAAAAAAEJvemLo0MR51 bnF... 3/4 F Z v O V 73 W73 O 0 CZ H C m 0 u O 3 w coI I 30 SVC PT 31 32 2" ELECTRICAL CONDUIT 2" COMM. HH AT SVC POINT TO COMM. HH TO CAMERA POLES 2" SPARE, FROM 24th to 29th END OF JOB HHs ----------- 3" SERVICE POINT COMM BOX TO SERVICE POINT COMM BOX CAMERA POLE MI COMM. HAND HOLE ELEC. HAND HOLE IM END OF JOB HAND HOLE FOR FUTURE CONNECTIONS TO 30 ST &32 ST FI I SARNT 5/1/2020 Mail-Jose Arana-Outlook Re: MBRC Ph III - CCTV Design for 30th - 32nd St Aragunde, Roland <RolandAragunde@miamibeachfl.gov> Fri 5/1/2020 10:12 AM To: Jose Arana <jarana@tarafaconstruction.com> Cc: Vega, Paola <PaolaVega@miamibeachfl.gov>;Guitian,Ariel <ArielGuitian@miamibeachfl.gov>;Jeovanni Tarafa <jtarafa@tarafaconstruction.com>;Felipe Rodriguez <frodriguez@tarafaconstruction.com> Good Morning Jose, My apologies for not getting back to you sooner.The below diagram looks great and is consistent with our goals for the conduit. If you need me to go out and mark the locations for the camera poles, please let me know, but conceptually this is fine. As we have discussed in the past, we are always looking to put the poles as close to the edge of the path as possible and near the corners of the entrances. Thank you for your work on this, Roland MIAMI BEACH Roland Aragunde, Detective Investigations and Technical Support Division MIAMI BEACH POLICE DEPARTMENT 1100 Washington Ave, Miami Beach, FL 33139 Tel: 305-673-7776, ext..3749 / Fax: 786_394-4829 RolandAragunde@miamibeachfl.gov Mission: Prevent crime and enhance public safety. Vision: We aspire to be a world-class agency, which protects our diverse community and serves as a model for character, innovation and service to meet the challenges of tomorrow. Values:Professional, Accountable, Honest and Proud. Our Daily Goals:Reduce crime and the fear of crime;Partner with the community to solve problems; Improve traffic safety; Operate the organization efficiently. On May 1, 2020, at 9:38 AM, Jose Arana <jarana@tarafaconstruction.com> wrote: Roland- Following up on the below.Please have a response to me by noon if possible. Regards, <Outlook-zmuukdpk.jpg> Page 259 of 2046 https://outlook.office.com/mail/search/id/AAMkADQxMDU4NmJhLTFiNTUtNDhiZC04YWRjLWVhYTIjMThjODA4NgBGAAAAAAAEJvemLo0MR51 bnF... 1/2 5/1/2020 Mail-Jose Arana-Outlook lose Arana 1 Project Manager 1 JRT Construction j 305.331.1524 The information contained in this email message is confidential and/or privileged,and intended only for review by the individual or entity named above.If the reader of this message is not the intended recipient,you are hereby notified that any review,dissemination,distribution,or copying of this communication or the information contained herein is strictly prohibited. If you have received this communication in error,please immediately notify the sender by email(jarana@tarafaconstruction.com),and destroy the original message. Thank you. From:Jose Arana Sent:Thursday,April 30,2020 3:05 PM To:CMB-Roland,MBPD<rolandaragunde@miamibeachfl.gov> Cc:Vega, Paola<PaolaVega@miamibeachfl.gov>;Guitian,Ariel<ArielGuitian@miamibeachfl.gov>; Jeovanni Tarafa<jtarafa@tarafaconstruction.com>; Felipe Rodriguez <frod riguez@ta rafaco nstruction.com> Subject: MBRC Ph III -CCTV Design for 30th-32nd St Roland,good afternoon- My crews will be done in a few days with the area from 24th to 29th. • Attached please find the design for 30th to 32nd St. It combines the plans I was provided with for this area,with the concepts in my layout for 24-29. Please confirm so I can proceed to lay this out. Thanks. Regards,' <Outlook-rxeldzll.jpg> Jose Arana Project Manager ( JRT Construction 305.331.1524 The information contained in this email message is confidential and/or privileged,and intended only for review by the individual or entity named above.If the reader of this message is not the intended recipient,you are hereby notified that any review,dissemination,distribution,or copying of this communication or the information contained herein is strictly prohibited. If you have received this communication in error,please immediately notify the sender by email(jarana@tarafaconstruction.com),and destroy the original message. Thank you. Page 260 of 2046 https://outlook.office.cam/maiVsearchtid/AAMkADQxMDU4NmJhLTFiNTUWDhiZC04YWRjLWVhYTIjMThjODA4Ng BGAAAAAAAEJvemLo0MR51 bnF... 2/2 4/2/2020 Mail-Jose Arana-Outlook RE: MBRC Ph III - RCO #3R3 - CCTV Conduit Work Addition 2" Conduit for Fiber Guitian, Ariel <ArielGuitian@miamibeachfl.gov> Tue 3/31/2020 12:22 PM To: Jose Arana <jarana@tarafaconstruction.com>;Vega,Paola <PaolaVega@miamibeachfl.gov> Cc: ARC-Jeff Crews<jeff.crews@stantec.com>; Felix Garcia <FGarcia@cgasolutions.com>;Jeovanni Tarafa <jtarafa@tarafaconstruction.com>;Felipe Rodriguez<frodriguez@tarafaconstruction.com>;Gianno Feoli <GFeoli@cgasolutions.com> 1 1 attachments(110 KB) RE:MBRC Ph III -CCTV Work; Jose—I received the attached email from PD requesting a 2"conduit running the whole length of the beachwalk (within your scope limit).Please revise your proposal#3R3 to reflect this additional conduit. Thanks From:Jose Arana<jarana@tarafaconstruction.com> Sent:Wednesday, March 25,2020 12:01 PM To:Vega, Paola<PaolaVega@miamibeachfl.gov>;Guitian,Ariel<ArielGuitian@miamibeachfl.gov> Cc:ARC-Jeff Crews<jeff.crews@stantec.com>; Felix Garcia<FGarcia@cgasolutions.com>;Jeovanni Tarafa <jtarafa@tarafaconstruction.com>; Felipe Rodriguez<frodriguez@tarafaconstruction.com> Subject: MBRC Ph Ill-RCO#3R3-CCTV Conduit Work Afternoon,all- Attached please find RCO#3R3 for the CCTV conduit work, for your review. It is a large file, please confirm receipt. It will be uploaded to eBuilder shortly. Please be aware that the subgrade stabilization work cannot proceed until the underground work is completed- JRT requests an answer on this RCO by Friday,3/27/2020,at close of business. Regards, . • Jose Arana Project Manager 1,444.4 .1 n J.R.T. Construction, Co. 3050 NW 77th Ct_,Doral,FL 33122 gra C. 305 331.1524 I F 305.557.9922 O. 305.557.9911,Ext.1015 Jose Ararw I Project Manager I Jk1• Construction i 305.331.1524 The information contained in this email message is confidential and/or privileged,and intended only for review by the individual or entity named above.If the reader of this message is not the intended recipient,you are hereby notified that any review,dissemination,distribution,or copying of this communication or the information contained herein is strictly prohibited. If you have received this communication in error,please immediately notify the sender by email (jarana@tarafaconstruction.com),and destroy the original message. Thank you. Page 261 of 2046 https://outlook.ot6ce365.com/maiUdeeplink?version=2020032301.14&popoutv2=1&Ieanbootstrap=1 111 Jose Arana From: Aragunde, Roland <RolandAragunde@miamibeachfl.gov> Sent: Tuesday, March 31, 2020 11:30 AM To: Guitian, Ariel;Vega, Paola Cc: Feldman, Steven;Gomez, David Subject: RE: MBRC Ph III -CCTV Work Good Morning Ariel, It seems the project gods are speaking to us at the same time as I was going to prepare an email about an update for the whole Beachwalk projects. First, I am good with the cost proposal(JRT RCO#3R3)for the conduit we had asked for. Unfortunately,we identified an issue while we continue to plan for"the whole" Beachwalk up to 87St.That issue is fiber connectivity, and that there is none available as we continue to plan north of 46St. In order to have fiber for the second half of the CCTV beachwalk projects(46St-87St)we need to plan for it now and bring it along from our Lummus Park and 14P1-24St Beachwalk projects and ultimately through this Middle Beachwalk Project(24St-46St). We have identified a type of Fiber package which will help us complete this goal for our current projects and future. But in order to bring the second leg of the fiber up to 46St,we will be adding a 2"empty conduit throughout all of the project components.This empty 2"conduit can run parallel to the 3"conduit there will be installing.This conduit does not need to stop at all the communication handholes and just need to run from the first handhole to the last in each section of the project so we can tie into it later as we complete the missing sections. For example,the section 24St-29St.There is a communication handhole at the most southern part within the SoW and one on the northern end.The 2" empty conduit needs to run from one to the other,and does not need to stop at any other point so no additional handholes are needed just for this conduit addition. (unless there is some construction reason and it needs to stop at a certain handhole along the way).I hope this explains it properly.So for simple math,JRT can add to the quote an empty 2"conduit for the whole length. Burns and McDonnell has completed the designs outtakes for 30-32St and 36-46St similar to what they did for 24-29St for the contractor. However,they are adding in this extra conduit we identified so the plans match. I want to add this note in now, but it should not affect anything listed above or previously discussed. In the new fiber solution we have identified,the 3" conduit in the communication handholes should not be stubbed up. Instead it comes into the handhole on one side,stops/opens for the handhole space and continues through the other side horizontally. The fiber we will later pull horizontally through the handhole has a pigtail which will stay in the handhole while the cable continues on.We can speak about this at a later time. For now,and to not delay the project, please have JRT add the extra empty 2"conduit into their quote. Thank you, Roland 0 4 , Roland Aragunde, Detective Technical Operations Unit MIAMI BEACH POLICE DEPARTMENT 1100 Washington Ave,Miami Beach,FL 33139 Tel:305-673-7776,ext.3749 / Fax:786-394-4829 Days/Hours:Tuesday-Friday,2pm-12am Page 2d2 of 2046 5/4/2020 Mail-Jose Arana-Outlook MBRC Phase III - CCTV Scope from 24th to 29th Streets. Vega, Paola <PaolaVega@miamibeachfl.gov> Mon 2/24/2020 9:59 AM To: Jose Arana <jarana@tarafaconstruction.com> Cc: Guitian,Ariel <ArielGuitian@miamibeachfl.gov>;Crews,Jeff<jeff.crews@stantec.com>;Jeovanni Tarafa <jtarafa@tarafaconstruction.com>;Felix Garcia <FGarcia@cgasolutions.com> d 1 attachments(5 MB) MB-Middle Beach-24th-29th ELEC.pdf, Jose, Please find attached the revised SOW for the CCTV work from 24th to 29th St. The consultant is working on the other sections but we want to expedite this portion so you can start the work. Thanks, Paola. Page 263 of 2046 https://outlook.office.com/mail/search/id/AAMkADCWOU4NmJhLTENTUtNDhiZC04YWRjLVWhYTIjMThjODA4NgBGAAAAAAAEJvemLo0MR51 bnF... 1/1 I 2 J 4 N I . 7 I I I l0 11 12 12 14 — SYMBOLS-POWER SYMBOL MODIFIERS ABBREVIATIONS U ^�* IwIctal aFOR Sheet List Table _ — —. — ---..--._ — ,o brora{CKGlTDN�saul rue!to _ WRING RACEWAY TYPES AC ABOVE COUNTER 1205X1145 A AMPERES Sheet Number Sheet Title - C RECESSED W CEILING AFF ABOVE FINISHED FLOOR 3-E-O01 ELECTRICAL SYMBOLS.ABBREVIATIONS.AND NOTES -L----r---E--- ELECTRICAL DUCT BANK CO COPIES BREWER AFG AMPERESNTERUTIN CO COPIER AC AMPERES INTERRUPTING G PIING CADACITY 3-E•101 ELECTRICAL PLAN-AREAA — OW 0 CONDUIT RODTEovEgnc.LLY OW SNER AWG AMERICAN FARE GAUGE EP OR EXP EXPLOSION PROOF BFO BELOW FINISHED GRADE 3-E=102 _ ELECTRICAL PLAN-AREA E__- F RECESSED IN FLOOR eN BOWDNGNETWORK A FPO FLAT PANEL DISPLAY COMM CONNVNICATToN 3-E-103 ELECTRICAL PLAN-AREA C GD GARBAGE DISPOSAL C CONDUIT _3-E-104 ELECTRICAL PLAN-AREA 0 -- RECEPTACLES LES O IR PTAC __• GFI GROUNO FAULT CIRCUIT INTERRUPTER CR CONTROL RELAY ---j _ _ 0-_ -_ ISCuTEO GROUND GRAN COOLING REFRIGERATOR AHANDLER 3-E-501 ELECTRICAL DETAILS 9 RECESSED SIMPLEX q) SURFACE SIMPLEX MW MICROWAVE CU COPPER Do 3-E•502 ELECTRICAL DETAILS Q RECESSEDOUPLEX q) SURFACE OUPL EX NIGHTPL POP PCPCORNHW T MAILER DTENT pSPT DEPARTMENT T RTMMENENT --- PR PRINTER DISCONECT • RECESSED QUAD * SURFACE QUAD RPROJECTOR EEC EQUIPMENTBONDING CONOUC70R REP REFRIGERATOR EF EMPTY CONDUIT B • SPECIAL RECEPTACLE SR SMART BOARD EF EXHAUST FAN (REFER TO DRAWINGS FOR NEW CON FIGURATION) SEAR SYSTEMS FURNITUREAGEACONNECTION EMT EMERGENCY/ETLTC TUB - SP1.LARGE WORKSTATION EMT ELECTRICAL POWER OFF• SPE INDICATLL ES QUANTITY OF ETA EMERGENCY ROWEN DFF • /ORKSTA IONS OF ETR LASTING TO REMAIN JUNC7ON BOXES CONNECTION SERVED FROM EX LASTING CONNECTION FRCP FIRE ALARM CONTROL PANEL SH SHREDDER FT FEET OR FOOT 4 RECESSED IN WALL.LION SWM CONTROLLED BY SWITCH LABELED NOV G BC GROUND BUS CONDUCTOR TV ON . (.E RECESSED IN FLOOR.LIONW VENOV GMKNINE GPI GROUND FAULT INTERRUPT ER C INCNMLLLIOIMTFD CLOCK GNU GROUND C WF RATER COOLER KZ HERTZ 'MIT REIAT WP ATHERPRCOF,PAIN 0F61 � RR72 WPMWEATHERPROOF NI USE.WITH GM MLO KCMIL THOOSANDGNCO MRS POWER DEVICES GENERAL IK KOX' FORMATN XX MOUNT Xr Alf LC LIGHTING CONTACTOR AK•AFP MOUNTXJt•AFP LPX PAMELBOATD•CIRCUIT LP LIGHTNING PROTECTION en PPS MAXIMUM NG PROTECTION SYSTEM GFI,--SYMBOL MODIFIERIBO MBGB MAIN RON MG GROUND BAR D ANY RECEPTACLE LISTED ABOVE NCB MAIN CIRCUIT BREAKER U MOF MAIN DISTRIBUTION FRAME EFJtI EQUIPMENT IDENTIFICATION _ __ MOP LOON DISTRIBUTION PANEL UM CFI'`PANELBOARO-CIRCUIT LEGEND NOTES MINDS. ELECTRICAL GROUND BUS Z SYMBOL M00FIER(5) '— --- MLO MAIN LOOS ONLY --ANYJUNCTION BOX LISTED ABOVE 1 SYMBOLS ORIENTATION DOES NOT IMPLY DEUCE OR ",„,c NEUTRAL.CONDUCTOR 1 EQUIPMENT ORIENTATION UNLESS NOTED AS SUCH SEE EFAI EQUIPMENT OEMIIFIGTION REFLECTEDCEILING PLANS FOR 16111 FIXTURE POSITIONS EC N1N01TIQNAL LLY CLOSED LCOOE mkt PANELBWRO-CIRCUIT MDOX�NTATKIMS NEWL NATIONAL ELECTRCAL E EGMAL RIOL HOOP IE((S) CONNECTION T SYMBOL SITE DOES NOT REPLY EQUIPMENT SIZE NON NF MOMI EASED ERS ASSOC NTON _5 • SEE MECNMIGIEQNPYENTSCHEDO MOUNTING HEIGHT INDIGTEDNLEGEND MOOM THE NO NOT INCONTRACT - INFORMATIEON FOR CONNECTION DRAPINGS SHALL BE THE DISTANCE MEASURED FROM THE NO NORMALLY OPEN NTS NOT TO SCALE REMOTE DISCONNECT SWITCH' CENTER OF TUE DEVICE TO THE FINISHED FLOOR P POLE �• • SEE MECHANICAL EQUIPMENTNOT ALL SYMBOLS ON TN6 SHEET ARE USED AS PART OF PS PANELBOARD SCHEDULE FOR ADDITIONAL7X6 PROJECT POU PODER DISTRIBUTION UNIT Fp/FORMATIONPED PEDESTAL PR PARR F PVC POLYVINYLCHLORIDE QTY QUANTITY • RIDS RIGID GALVANIZED STEELCUNDU17 J RL RELOCATE p RM ROOM RNC ROIDMETALCONDUO EQUIPMENT - RFD SURGE PROTECTIVE DEVICE SPSI SINGLE POLE SINGLE THROW ELECTRICAL PANEL DES SERVOS ENTRANCE SYYITCNGEAq ST GRUNT TRIP 0 NN ELECT MAL NANDYOLE SW CH S00.7X SW IE OILIER O CAMERA POLE TM TELECOMMUNICATIONS BONDING BACKBONE --= TO TEMPEST SHIELD GROUND r7721 FIELD PANEL TON TELECEWMUNICATIONS GROUND BUS 7120E TELECOMMUNICATIONS MAIN GROUND BUS �BURN1 TYP TYPICAL 10.114SDONNELL UL UNDERWRITERS'LABORATORIES LION UNLESS OTHERWISE NOTED /400 WARD PAR AWWY UPS UNMTERAUPEIBLE POAER SUPPLY ICANSA dCIITY OB4ITA H V VOLTS VA VOLT AMPERES 612 blalPtl PITS VARIABLE FREQUENCY DRIVE Al WIRE OR WATT 010780 A ALLEN MAR TRANSFORMER dAS/OKI dlAtid Z IMpEDANCE C KEOS L CANNON q2 8 -. il �7/ MMWI BEACH.FL I MIAMI REACH POLICE SURVEILLANCE G! MIDDLE REACH ELECTRICAL SYMBOLS.ABBREVATONS.MD J NOTES R PM.ROOMED I=Cm! UINlnp 3-E-001 — A NIR RI .NAW 1 II.O.E•001.drq 1 1 3 4 E E 7 I I I 10 11 11 11 14 ed KEYED NOTES:U GENERAL NOTES. PRI 6In I I I de.... D jnroinclexa Imo I SORE FOR BID 1 TYPICAL UNDERGROUND ELECTRICAL CONDUIT.SEE NORTH FROM 24TH ST.TO 26T11 ST CON TRACTOR IO 1. THE ELECTRICAL SHEETS SHOW EXISTING CONDITIONS DETAIL 153-E-501 VERIFY THE CONDITION OF THE EXISTING PANEL THAT HAVE BEEN PREPAREOBAREO ON FIELD 7 TYPICAL LOCATION OF FIELD PANEL SEE DETAIL PROVIDE UPDATED TYPED PANEL SCHEDULE OBSERVATIONS AND ORIGINAL ORAWNGS.ADDITIONAL 3F1E-501 FOR DETAILS CONTRACTOR TOCOOROIIIATE WTN MIAMI BEACH COMPONENTS AND C0NDIIONS 7NA7 ME N0T SNOW! EQUIRE 7. NEW CAMERA POLE SEE DETAIL IP3-E-602 FOR P0LE PUBLIC WORKS AND MIAMI BEACH POLICE ON THE DRAWINGS/MYOREADJUSTIST AND MENTSAY TNATA AND POLE BASE DETAIL PLACEMENT OP POLE SHALL DEPARTMENT AND PROVIDE KEYED PADLOCK FOR NNOTED OTHE DRAWL ADJUSTMENTST ELANENOT LOCATIONS BE POSITIONED Y OF 7NE BOARDWALK AND PRESENT PANEL. OF TEL ON EXISTING EQUIPMENT TELD VERIFYDEVICES SHOWNON OFALLALMN NG RQUIPMENT DNO ON A 0CLEAR 00001FIELD ATE FINAL LVS WTO THECAMERASMRMI 0 FOLOCREFERENCETIOCONTAINING TAI NlG.THE FOLLOWING PANEL THE DMWNGB PRIOR 7O BIOOING POLICEIDEPAFTME LOCATIONS WITH MVAII BEACH LOCATIOND PANEL, THEED TO'MHG POLICEDEPARTMENTPESlERK D POLE.N,AANEL SCHEDULE 1705240V.SPCES 2. THE BECOMEELECTRICALMILIAR WITH T SHALL TINGVISITHE ITE .. 20.610E ELECTRICAL NANDM0LE,BEE DETAIL AVAILE.AVAILABLE PO NELOPANEL5150 DEAE6SONS A PROR 70 COMAENCIN WORK U LESS IDICACONDITIONSD TORS E1 HE CE ONLY THEAT ER I ^G ASEEN DHFRONTAND PRIOR 70 AOL MEMCINOVANRUN R S1ADICATE0A5 5 FOR FIELDP PANEL INS EXISTING PORT OF THE WEATHER HAS57RIPPUBEEN ELFORTtT 18 CONSIDERED NEW TERW45 ANO LABOR SHALL BE ME FIELD PANEL INS TAILED AS PMT OF THE IATN• N0T RECOMMENDED TO USE THIS PANEL FOR THIS CONSIDERED NEW 23RD ST PROJECT PROJECT 3 NOT ALL EXISTING UTILITIES MO OR ELECTRICAL 6 24TH STREET PANEL LOCATION CONTAINING THE 9. FOR REFERENCE ONLY.27TH STREET PANEL SYSTEMS ARE SHOWN ON PLANS CONTRACTOR IS FOLIOWNG PANEL LOCATION CONTAINING THE FOLLOWING RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING 4IE14EN5120240V,I PHASE 775A BUSS 12 POLE,NO -UNMARKED PANEL.APPEARED TO BE 120..06.I CONDITIONS PRIOR TOCOWENCING WORT PANEL SCHEDULE CURRENTLY AV.EARLE.*SPACES PHASE.30A mos.12 POLE 140 PANEL SOREDULE a COORONATE Will IRE IMAM BEACH POLICE AVAILABLE SPACES AVAILABLE PANEL D A CUSTOM ENCLOSURE DEPARTMENT PRIOR TO COIMENCNONORK 7 PROVIDE To 747 MEANER TO POWER FIELD PANELS IAN INTEGRAL CONTROLS IT S NOT RECOMMENDED I SEE DETAIL 704.507 FOR CONDUIT AND CONDUCTOR USE CIRCUIT 7.0 TO SERVE FIELD PANELS TO THE TO USE THIS PANEL FOR 11115 PROJECT SUNG 'ITtiffs/4•Pe, •c,tib, 5 •C. • 14„ `SAA K JA '1'..i1:17..!:','• F ' �RRt.L,_ �'���J I.1_'w Kpy^ap l �f- D -I 1:.. ". / .PMP f - ,/ I -1..""^44 I •1 lir l' f ;. r }' KEYPLAN RA 'D.E.:. .. jib' ;$ • t�Fs�. — ��,., t. '_a7 .. ^AY Pa �.;•� 6 «-1N I.atn • �1• ..' �+ 'Vt D C B i'i'i'• A • • • 1-1 ADT . �F•yyp . ' , 3 - P �r •F P041,-:t.. p T a • '_ tiFr d r`• ,I; Y .1, ! •'P:.� f l `u4.7 • f .`i 4t0Ai 4,,.. ",,,, ,..„ ...,..., . .., . ,...„.k:,... 4.' ,c --= • -. rip • BLNINS (b11;1J• 7 r°I� «. - • �MSD0ItlF11 - 9MW MCAD PMKYNY Q. r �T IA . PAHS8 0.c�m Bel le N " .'-1:-. . `-.. • • • r. 7 01 nein A ALLEN ' J S - 1 R .� C.X1O5 LCANNON ] - Mti .!. ],z . .. N.. s DIXIE BEACH.FL MAOI BEACH POLICE 6URwLLANCE ELECTRICAL PLAN-ANEAA 01 MIDDLE BEACH ELECTRICAL RAN AREA A U TAI•PL i —4 I am84.1 2010 - . ._ &...0 3-E-101 _ MY A F .h. al Mob F T r I Be 3-E401 6w0 • I 2 1 A I B T I I 0 10 11 1i 11 14 001 am.I or I tlW I awlPWe KEYED NOTES:0 GENERAL NOTES: 1. TYPICAL UNDERGROUND ELECTRICAL CONDUIT.SEE I. THE ELECTRICAL SHEETS SNOW EXISTING CONDITIONS 0p7NTf7I,ICKG1TONII•+`SUE FO0.DID DETAIL 1IS.Ed01. THAT MANE BEEN PREPARED BASED ON FIELD 2. TYPICAL LOCATION OF FIELD PANEL SEE DETAIL ODSERNATIONSANO ORIGINAL ORAWNOS ADDITIONAL 3lE.501 FOR DETABD COMPONENTS AHD CONDITIONS THAT ARE NOT SHOWN 0. NEW CAMERA POLE SEE DETAIL D3E•502FOR POLE OX THE ORAWN09 MAY EXIST AND MAY REGIME CERTAIN RE MD POLE BASE DETAIL PLACEMENT OF POLE SHALL MODELING OR ADGJSTMENTB THAT ARE NOT BE P061TIONED WTNIN20F THE BOIIROWALK ANO NOTED ON THE DULWICH.FIELD VERIFY-nit LOCATIONS PRESENT CLEAR FIELD OF.IE14S WITH THE CAMERAS THEOF D AWACS ROU TO BI AND DEVICES SHOWN ON A COORDINATE FINAL LOCATIONS WIN MIAMI BEACH THE ORAWNGB PRIOR TO BIDDING POLICE DEPARTMENT 2 THE ELECTRICALCONT0ACTOR SHALL VISIT THE SITE A. PROVIDE ELECTRICAL HMINOLE.SEE DETAIL MD BECOME FAMILIAR Wm THE EM57ING CONDITIONS 2YE.501 FOR DETAILS PRIOR TO COMMENCING WORK UNLESS INDICATED AS 5 NTH STREET PANEL LEGATION CONTAINING TNT EXISTING.ALL MATERIALS AND LABOR STALL BE • FOLLIAMNG PANEL CONSIOEREO NEW LOCKED PANEL ASSUMED1O DE 1232110 I PHASE NOT ALL e PROVIDE 121702 BREAKER TO POWER FIELD PANELS ' SySTEMEARE EXISTING PANDO O TRACTORI SESPONSIILE FOR FALDWRE CONTRACTOR 2 III H20410 SERVE FIELD PANELS10 TO SE NORTH ICEFIFROM RESPOFIOW MOR TO CONMENCINION OF AIL EXISTING ii PTO KAD D STROU H FROM 3 4TO ST TO SOE F STD COORNIONS P TH TO TALON BEACH WORN PANELSTRACT RT vERXFROM CONDITION 7OT ST DEPART-INERT WTHT TO COM ENCIN WORK OLICE CDIITRMTOR TO VERITY THE CON MDExiSTRDEPARTMENT PRN7q TO COMMENCING PARK AyAILABIIIIYOE LIRCUITB OF THE EUBTING PANEL SEE DETAIL VS E.002 FOR CONDUIT AND 03N 00CTOR $y. PROVIDE UPDATED TYPED PANEL SCHEDULE A &ZINC 7. • • 41.0 I h'r'44,1.Id'IY4'L'QTAA'1 • ��KSn .. .l ..gt H�� c r ^. '••'20'!4/1XIHip YijIL�M�P •. ..44...-...:...,,,,-..-•:..../......-.... -,1y /•':)T `F. 1 ..,.,.'p r OAro F "�i.6..k. 1 �, +N M' '� .,,� "........W. 414 °+T. t -- R!�}� ' XI j. � t b f _ ! I Ir Y' MMGi (IA .�4.ry1 200' (''• ~I .t - w1 L�`^ 4` 1, �1 V^titw� +p fiR� � .el.130313001.431i. + F •w i I y w �L t **' igq r.+ + .�� �, tP .1 •_ .: ..1:7 .. .. NII q ,. A• it it '� .m r M,..: o c ?ht.,: A I• { '�i, tit, ,, ir l.. a •3.1.313CPH to LI Is...I wok WA., ,• 3 • -E. r, • /1 � - 1•rrn,t N _ ?� d • 7 Included In.3 rslPrn+.l .' ; . _' �` • • -T ' ris ' I w ; ...� �' �:i •, ' 1 0100 SARD MO 6411 / KANSAS CITY. al l• X l • • .rY' • 7T:'T 01117120 A ALLEN �• ,� ;JLC-.. - • 6ap�.a a l t r--� 02.1 \ �• A }} � m C.KLOS L CANNON • 1 • , —I .. •., • 1( 4F,! tiiiiii,':..L, . • BYO ., '1r - ,I• R 420- 20 MINA DEAL H.FL ...,... •• •' ^ MIAMI BEACH POLICE SURVEILLANCE ELECTRICAL PLAN•AREA B I MIDDLE BEACH ELECTRICAL PIAN-AREAS U 2 poled I".""dnom I.? WO 3-E-102 — A lIe 2 syMYvan8 T �v .1L M• E.io20eq M I 2 I 4 I I T I I 0 1D 11 1E 13 14 KEYED NOTES @ GENERAL NOTES .7 I d...I 1 I ....P.3. 9A/v0TRCKO TDM ISSUE FOR IND I TYPICAL UNDERGROUNDELECTRIOAL COMSAT.SEE 1 THE ELECTRICAL SHEETS SNOWEKISTING CONDITIONS DETAIL 1Z3.E•501 THAT HAVE BEEN PREPARED BASED ON FIELD OBSERVATIONS AND ORIGINAL DRAWINGS ADDITIONAL i. TYPICAL LOCATION OF FIELD PANEL SEE DETAIL SZLEd01 COMPONENTS AND CONDITIONS THAT ARE NOT SHOWN FOR DETAILS. ON THE DRAW/NOS MAY EXIST AND NAY REQUIRE CERTAIN REMODELING OR ADJUSTMENTS THAT ARE NOT 3. NEW CAMERA POLE BEE DETAIL DIE.3472 FOR POLE AND OF NOTED ON THE DRAWINGS.FIELD VERIFY THE LOCADONS POLE BASE DETAIL PLACEMENT OF POLE SHALE BE THE ORRELL NOXP TCH TO ITDING.ND DEVICES SHOWN ON A THE PRAWVINCB PRIOR TO BIDDING. POSITIONED FIEL NF IET VIF THEHECA ARLE AANCPRESENT CLEAR EADOFVIEWS MIANTHEOII COORdNATE 2 THE.EECOM E CONTRACTORMULLEXISTING THE SITE DIEPARTM LOCATIONS WITH MIAMI BEACH POLICE ANDBECOMECOMMENCING INNATNTHUNLERDINGCONOS OEPARTYENT EXIOR TO LL\UTE WORK UNLESS INDICATEDLREA9 COSTING,ALL MATERLLLSARO LABOR SHALL RE CONSIDERED NEW • PROVIDE ELECTRICAL IANDNOLE SEE DETAIL 2/1EA t ] NOT ALL EXISTING UTILITIES AND OR ELECTRICAL FOR DETAILS SYSTEMS ARE SHOWN ON PLANS CONTRACTOR IS RESPONSIBLE FON FIELD VERIFICATION OF ALL EXISTING CONDITIONS PRIOR TO COMMENCING MARK • COORDINATE WITH THE MIAMI BEACH POLICE DEPARTMENT PRIOR TO COMMENCING WORN • SEE DETAIL TI>E-SOS FOR CONDUIT AND CONDUCTOR SIZING ti er - . .• � Tom• 7 l MN •+H..,1r• A''----'41........:'"' 1y.n w,.n „^ 'A [T9INNAI 7.--!.• `.. t� ; , A•••• w • , ."••-•- �� J J d .p. ''...4.•• •�f -.rr.Y E.y•AX • -...:...;..;.;-...•.... A +.� _ :.....,' ��li "MCIyM1,Ie`j _..� - —31 1f j - � ' - _Glu • :.;• ,�— hi ° • r o • 1; r ` ti' +Lr•,r• c. aT OW... , 1 i • Air + qFdT s . ..,l'( _ -if 1} e ,I • , TL,, •\ .�'ti "�• } rt I' •• ^1!<y ;tag TO, t�.K __ ... e °i «� w�� € • . I •,•4 �+ ( . 1 • r.tr KEYPLAN n its° +p t.•A .Q '1 ...en 08171 I'r s n 1 :.' � 1J1 J .F NMI,:PH N Users arn-w 1 Yom„ie� —_ c {, V rr ran,rN SE.O wPn RCDq Dn.nl 'Li: •••• 4. 1=.''' . - ..s,.4*..,,,•1: ii, ::.•'' . r.:., .: .. .... , . ,,. • . .• i 11LT C r ..... .� —Ai; i 11111,1` Iilr i . � I .- f D 'L • d1 1•, , . ._... • ..., y P� • 11/ 1 Imirtlrd+ 1� `BURNS i �' . +Et,, f• ' • N.. MGDONNELL • L• • Y KANSAIC TY ND bAI• • dN d•Aimi .. DD A ALLEN 1 •' .. i+vMiIHTO dMdlad i 1 C NEOS L CANNON g Cr\ W __ .......r,. I L . A J A a. Ar /"••• MAINMUREACH.FL MIAMI BEACH POLICE SURVEILLANCE MIDd.E BEACH ELECTRICAL PLAN•AREA C 1 ELECTRICAL PLAN•AREA C Praia I comma ITO X (11)10 407 MP d..�3-E-103 — nY A 1 WALE ini FEET OW al •I+,Im �....._..-. + J. _NO 3-E.I01 652 3Varo1.3-C vu 1 I "....—.'.• • IV Y���4 _ �\ �.1�Iw iTM AV Swu1y - /7 a. 0 MOLL W4^.. p*d 9 L 033331•11131VJItl10313 O 0 V3NV•NV1d 13,311110213 H3V3310013 204V1113Atl1183340/1140We 1133111 1!•10.39 IrMr1 "•'-i i, l «Y� ` .. l • �. r- • • ' 101.330 I SOUO y .. • , 7 0.Y1Wd qudl.q . • ,.... S N31-1V V 034110 _ j ' 3 N rllrS011 OIMNVII ` AVMINW OtlMN 00M •TI3NllO0 w` - ..1 RStiting �I - . o 14 . ' ! h . .I f.. . '':.6,L1-..i„ . r ''''qfilliftiii-,..17k. _. E. 3 V 8 O •: 1 qIf + !7• :, ...,rn:...a • ~` �17{ '9Ii 111. 1,3uu.lallo• II, ,_:-- r ' ��r f� ::j c-: " • > I1 • 4--- _ ,:•... ..,: .11 y-1101: :1:, iYf .....h,•,,,,. 3 a ww.` ;NMi i •• - •••ter ;,�, „ - .,.y ° ` �1 •.,` ` .% .•_ • ., N: 4,•••I•Nwew••10 • r,r .�,�: l .. y- • • (.11C•1: •,-,..,„...e '`r;, , .,{P.'. i •• et•f . r '1r.11�.1 O T. r r.� ..1r1r1F •.:Mft.r ' r•r a... tit r r,•-‘,14..., •• ., .YAN.•f•A.- -4.-–:s. al-Mar.....,,,, • .�,• • '�'-^ .•;'170 .•.RG.3 M,�1, .. • r tr=:r owls HO1000X00013V1 3l04003303105.31.4113130335 r YNOM9 *3311N0001tl01M11M31113Vd30 • 331-101 Nana WOW 341 HIM 313330300.0 t NNW 010131110.0011013 9401110903 30333NO MO 3901 33333d3 041193-3 11110 MO1LVO131M3A013I4 NO3 339191035333 411113413 31105 319311VAV 633335 L'316VLVAV 91010V14104 5331411033033031151131315 01111311331310333051303304'111013003 W04110313 3300436311111100111933333101. L SI 80111003.55091001'351131'007311330133 - 1333340330301103 M311 3019541V'ONNO3 39141533081101151Mtl31331173 31419NIM133NMMd133Wm0113 N1331IS.11031p3 S 03 SV 0313] NI 0593Ian N10A19103g 01133001 V0111 5031311 3 101•3111 SM011104000.1=331, I 03340339033 18130335'310N04011333310313301003 r 311531101041TIHS1010311 33*103,011103133111 L 1N3111HVd3030110d ON00®Ol 33013335030*31103M13330 3303333331 13.0 &1113001 333331VbO4000 V NO NNO*50 33330 ON003301 fO3 OHI151Y311Vd1 NO310300010110033333010400MV133533Vd30 SVtl3N1034111MA G331A 30013103031011135339 533 1J013N1A31tl31113313 3000030311 NO I311V JO 321303'1OV391NMN ONV SN11YA0119nd 88333.0301093141 AO 2 NINON 03MOILSOd39 ION 3W10H1 SIN3N0S3I13 NO 1N1113001131NN1837 X03333 3033014 HIM 30103100001330101331103 2103303 lO 143130133133130351831610X3 3NI083tlAWN 313331 19113AVI1008MAV403N1 N0 310031038138 we 03WA1131VOd3301MNd 13133 31034030:9•3T111N130335330d V13RIJM3N L /MNONS 104315331300 NON000NV 5013103 NOO 0303333111 AO 51100111030 AL119ISVA30'13 3913113133 0 40113003 1000111001148001013M01tl0 OMV5Md13A13S90 801103003X100$3331 101033301215 14103*01 1513033913W30131330401190011101131 3 01314 NO 03538 9333 I13!511339 33311311 ONL311OM 41005 3N101013Md 01313 3303004 109341133130 3580333359•N01IOY:1f71JlN[!�0 911011M300 0411913 MONS 31331491v311113313 3141. I 513433 01313 43V0d 01 9334,399 toe f1130M01a 0 339'1110807 TO 331031304 nOLDN3(1..•M1dA1 I 1.9N✓rp IPPI AN I..n Iw 53101TiV13430 /1 23/014011351 HI OH LL 11 01 3 I I 3� I S 0 1 L I — 1 2 a 4 0 E 7 I l I 10 11 12 12 14 Ho I M. I N 11Fa I &Ralph. 0 k2rACAGI TDN1ISSUE FOR BID SAWCUT R EA6TIIN0 4-COMPACTED ASPHALT FOR IRENCNING A5PNALT(MATCH A EALSTING TYPE) MATGN FASTING MATCH EXISTING FIN6N GRADE a a�amp FRISR GRADE Nl41. -- 1 .` L ��7� tiL �� \�• LOCATOR TAPE tMldi]OI.E RE9UIIKMTNTS �.. ,• LOCATOR TAPE (� I awl F, I A.,. Yrrt (II,. r ro AE OLE N a ERWI evert OFa®vY1 i(w+lNa rmA3 R 1`. . Y®C vrl 0F{R1R SmOLM v p IQ lvw remv RI` ` 1 ILP AD NQ 1NM rve•AD a PAC!UPC v RO 1133,416 11�16 FMA a ,� .• I��E�1� ELECTRICAL CONDUIT POW SiTii a• N.1 a GD a curt TIMM SUL NILS M H3RR W EEE`.... ELECTRICAL CONDUIT \'W V*• I ; a.aNNAC A.f0 i rR M1u6f146 1 tam6 rm 1...3X1 o mrP OS row mtmrs ma 2 �- ELECTRICAL CONDUIT ELECTTOCAL CONWAY imam C N PAILTN UNDER ROADWAY •Nw.— . ELECTRICAL CONCUR PLACE MEM.DRECTIONALTYPICAL ELECTRICAL 74. BORON] O1 KANOHOLROETAR 2 4 NOT 7000015 NOT To scALE " j D I - PANEL MOUNT STRUCTURE.VATH R UNIBTRUTCHANNEUNG ANO —1 CONCRETE FOOTINGS.COORDINATE 512E MO DETAILS OF F0011NOS WITH STRUCTURAL ENGINEER \ E r FIELD PANEL-NEMA 40 ENCLOSURE 2 _ PANEL PROVIDED BY DIVISION ELL _ •— BEE SHEET 2-TY•502 FOR FIELD 2/030062 DISCONNECT PANEL LAYOUT ...-----. lJ F - 0 .12AX0— r - SEE PLANS FOR POWER •- NEWCM NEIN �BOURCE OA NANGHOLE j IWIDHOLE 1 l� BaBURNS `MiDONNEIL ARRWAY 00WAR PARNWAY la KANSAS CITY MOF11a010-333GN dAN dHNaJ 0111200 A ALLEN deynod d.d. CONDUIT TO CAMERA U� ` /I � Y I \�-rr// C NLOS L GNINON 1 GONONI TO No • • CCNONT CONTAINING CONDUIT TO f OYVER SOURCE V HARM=-- FIBER M AND CATO OUT C OR TO NEAT NANONO E.SEE PLANS FOR DETAILS I NOTE I PRNOE HELD PANEL 70 EVERT LOCATION DROWN ON ®FIELD PANEL MIME BEACH,FL I OELECTRICAL PLANS YIARIAIACN POLN:E HUROEILLA CI 2 SEE SHEET 3 .902 FOR ELECTRICAL CONDUIT ANO CONDUCTOR SUING MITOLE BEACH U 2 BEE'TN SERIES SHEETS FOR CONDUIT SLUNG ELECT FOCAL DETAILS a SEE'L Y SE RIES FOR SEC BRITT ONE LINE pMORANS n Dari1TP}CAL FIELD PANEL. Pela�I26767 + � ELEVATION VNAtN p w ON3T TO SCALE 1 3-E-501 - A M m el OwlsT .__-_... ... I FN SESON Wm C • I 1 I 4 S t 7 ■ I I 10 II 11 11 14 NR l ba l h l da l b3PIBf 0 122427121 CFO I TON(ISSUE FOR NO ROUNDED TOP A NEW POLE MOUNTED CAMERA SEE \ N SERIES DRAWINGS FOR DETAILSc _ THIS RCO IS FOR CONDUIT ONLY. - �e ALL OTHER ITEMS SHOWN ON THIS PLAN PAGE ARE NOT INCLUDED. CAMERA EPA WHO LOAD:XX C 1 1.2' D .g I PROVIDE a S'DWAETER LOUIS POULSEN -9 I 12 MOH ROUND STRAIGHT POLE IN WHITE FITOMATCR EALE STINO LIGHT POS IN LUMMUS PARK MIAMI BEACH PUBLIC -- PARKS TO CONFIRM POLE CUT SHEET B IPRIOR TO ORDERING HAYDNOLE I �— l _ bTN ST PAMEL zEno MS IIISEC 31• 0 , SIUB CONOUOS)UP T ABOVE IM1 BND ASE ARUSH EMIRS)MP) SEC DM FEEDER ANO BRANCH CIRCUIT SCHEDULE 1= BON D CONDUIT MD POLE EQUIPGROUND 1RViW CONDU1 BIOSE COVER WITH EB BC 6EC)0 CONII DUTOR B CONDUCTOR - SUER -._- _ _... 00000INATE ANCHOR BOLT I® •J'. 112 A17 Ya' - -- REOUTAEMENTBVATH POLE BJL'.I •10 T- •10 - Sla- ISEC OII �'+:N FN.. •to 1. .. .• SPECIFICATIONS I® 'j;� b J10 1' D ,RADE L r NOTE:CONDUCTOR SIZED HAVE BEEN INCREASES AS NOTED •_ -'III 1-11111:4 l II. LSTECDB� FOR VOLTAGE DROP.CONTRACTOR TO VERIFY WITH ACTUAL _. �I Il I� ® J CONDUIT ROUTING MD FIELD PANEL PLACEMENT. I I I I : (HTNBTPANELG -_-_ __. .- _.. . _. . - 4BURIN��NELL EAOTNE0MIC MD IIIIIII MEM _• • IItI��I II • ® KASS15�CIT-Y. GROUND ROD II Il SNTI 1 PVC COATED RGO OR AIC CONDUIT :SEC], 716AT0100 H 1,1 = ISI/ \vim L _ = 1SE 1� by 0111700daaimf ALIEN , '7'11 I I 6�'C FLOS L ll 111 PVC TO FIGS ADAPTER(T'IPI tSEC12I V r cANNCed T I S I SEC 1U �_ 1 1 • I ; P 'I [E11 9 r AP } 1-2771-I9T A� -''-' 1 NOTE:POLE BASE MUST BE DESIGNED BY 0 • PANMIAMI BEACH,FI A STRUCTURAL ENGINEER.ANY DETAILS SHOWN ARE FON REFERENCE ONLY MIAMI ll EACH POLICE SURVEILLANCE MIDDLE BEACH ELECTRICAL DETAILS 1 _ _ TYPICAL CAMERA POLS I GIRCUTT OIAORAM N O7 • *wi 1iWB0 I o11Md I *win .. NOT TO SCALE NOT TOSCALE 3-E-502 — A F 0100 d 0I•04 • 1 2 1 4 I I I 1 l 0 10 II 12 17 14 COMMUNICATION SYMBOLS ABBREVIATIONS COMMUNICATIONS Aal dab I Ln I dol I &AKRON, — — T _ — GENERAL NOTES: 0172IR71R4CRGI TON ISSUE FOR LRD _ Sheet List Table Sheet Num Sheet Title Z ONE IT)CATEGORY 8CABLE ONPPM CONNECTOR ONWULL AC5 ACCESS CONTROL SYSTEM 1 ALL COPPER TERMINATION TARDANR(TOEESCREW PRONE FACEPLATE AFF ABOVE FINISHED FLOOR TERMINAL TYPE.LAND 3-TN001 TELECOMMUNICATIONS SYMBOLS,ABBREVIATIONS,ANO NOTES / :NAG AMERICAN HAREGVIGE . •6 CABLES ON ILP/BC CONNECTOR(ARE) ,BCC BACKBONE COPPER CABLE 2 TERMINATE ALL CONDUCTORS.NO CABLE STALL CON TNNNON 3-T_N101 TELECOMMUNICATIO_NSPiAN-AREAA BRED ITACRBGARDTERMINATES ELEMENTS f10EPTTHE 7lTNPAIROFBNDER 3-TN102 TELECOMMUNICATIONS PLAN-AREAE /Oz 16 CABLES ON&NEC CONNECTORS I 1156" BASEMENT GROUPS IN MULTI•PAR COPPER BACKBONE CABLE MARE A 91S BALANCE MAGNETIC swami TERMINATION ONLy AT INDICATED OUTLETS.TERMINALS. 3-TN103 TELECOMMUNICATIONS PLAN-AREAC •6CABLES ONbwDC CONNECTORS(DATA CAT a-AARLOME$OAY 6 UTP CABLE CROSS-CONNECTS.AND PATCH PANELS CATV COMMUNITY ANTENNA TELEVISION '.3-TN104 TELECOMMUNICATIONS PLAN-AREAO CCTV CLOSEDCIRCUR TELEHSION 1. CABLE MAY NOT SESPICED.UNO — C 3-TN501 TELECOMMUNICATIONS DETAILS 0 DENQIESCERING MOVNEED OUTLET CO CO6LE DUCT —,_ _ — CER COMMUNICATIONS EQUIPMENT ROOM A MONITOR CABLE PULL TENSOR TO ENSURE MANUFACTURER DENOTES CEILING MOUNTED OUTLET CCLOSET RECOMMENDAT ION AND INDUSTRY STANDARDS ARE NOT CNTAT N COMMUNICATIONS OMMUNICATIONS YABTTENANCE HOLE EXCEEDED COMM H COMMUNICATIONS CABLING SLEEVE OR CONDUIT CT CABLE TRAY DEMO DEMOLITION 3. PROVGEPULL STRING IN ALL EMPTY CONDUIT OR INNERDUCT B DIST DISTRIBUTION PULL STR TNG TO RATED F OR NEO LES.IN ALL CONDUIT CT OVERHEAD CABLE TRAY.17W UNLESS NOTED EES EARTH ELECTRODE SYSTEM OTHERWISE EF ENTRANCE FACILITY B. PROVIDEHANOHOLESFOR INCONDUITS NONORETHAN 480- • •=-i TELECOM GROUND BAR EMT ELECTRICAL METALLIC TUBMG FEET APART AND EVERY 180 DEGREES OF SEND EEL XISTINO NEW \ ETM EXISTING TO MOVEATION 7. NO CONDUL EIS DR SIMILAR FITTINGS SHALL BE USED. O' -- UNDERGROUND fCONDUIT DR TRENCH ETR OUSTING TO REMAIN ETER EAISTINS TO BE REMOVED S. INSTALLATION CONTRACTOR STALL INSURE ALL EW Eal AOI ILEI COMMUNICATIONS EQUIPMENT RACK GF/GI GOVERNMENT FVRNISTED INSTRUCTIONS OF ALL CATEGORY 6 DATA CABLES DO NOT C • GOVERNMENT INSTALLED EMCEED INEALLGNABLESSMETERS RSMIBETWEEN Q CONDUIT CCM GF/C1 GOVERNMENT FURNISHED TERMINATIONS CONTRACTOR INSTALLER O CONDUIT UP GULF GOVERNMENT INSTALLED CONTRACTOR FURXISNED JUNCTION BOA GAD GROUND HN TA/WHOLE WALL MOUNTED JUNCTION BOR LAW OC NS OI AI EPLL CEMENT CONNECTOR LUTILITY POLE['TOTTERS•REFER IO ELECTRICAL IDE INTERMEDIATE DISTRIBUTOR FRAME 0 .� `Q ORAVANGS 'IDS INTRUSGN DETECTKHO SYSTEM - 'IC WINTER ME DATE CROSS-CONNECT f----1 CONDUIT BECTONN INSTALLED WIOIRECTIONAL Edi£ C INTERMEDIATE METAL CONDUIT i --.... DICT BANK VY LOCK MFA ELECTRICALNETVARR MA% MAXIMUM CALAR OMPOLE WITH RISER MT MANHOLE MMINIMUM MAINTENANCE TOLE MM MULTIMOOE El HMD HOLE MRS MASS NOTIFCATUSYSTEM I"� FIELD PANEL MTD MOUNTED CE BUS [' '- MISS MASTER TARGET DATA PANEL NEC NATIONAL ELECTRICAL CODE NC NOT IN CONTRACT E NTS NOT TOSCALE / _ OBI OPTIONAL BID ITEM I - CABLE OLI OPTIONAL LINCFO OPTIONAL FIBE EITEM - OSP OUTSIDE PLANT PA PUBLIC ADDRESS F PET PROTECTED ENTRANCE TERMINAL PR PAIR PT POINT _ PTZ PARIlITI Z00M PVC POLYVINYLCHLORIDE ROCA RANGE OPERAT ANSI CONTROL AREA RCB RIGIDGALVMIZED STEEL ASC RIGID STEEL CONDUIT RM ROOM RMC RIGID METAL CONDUIT 0 RE RACE UNIT SCTP SCREENED TOASTED PAR . SHT SHEET SM BINOLEMODE FIBER ��A•��� I TBL TABLE - ,YVLYN EDP TARGET DATA PANEL y�yA�M� TOB TELECOMGKOU TONG EIS BAR ` HELL DIGS TELECOM MAIN GROUNDING BUS BAR TR TELECOM ROOM I 94W WMO PARKWAY KANXT CITY,MG OM11M TS TETYLEVISION 816 a1YL00 L N TTP UNDER IN UNLESS OTHERWISE NOTEDLABORATORY UXO UNLESSATNfRGESENOTET PM BAMIMd UTO UT MENSAL TARGET OUTLET 0107TH AALLEk UTP UNSHIELDEDWASTED PAR downed LAAO UNEXPLODED ORDINANCE WI WITH C KLO6 I.CANNON V MAW BEACH,FL 1 MIAMI BEACH POLICE MJITVEILANCB MIDDLE BEACH TELECONMIUNCATCNS SYMBOLS, • ABBREVIATIONS.AND NOTES {Fold I POIBd 1m® km..ay NA, – 3-TNOO1 — A An. a Mem TD � e --- - ' t1E}TNOOE amp_ 1 2 S 4 6 6 7 ■ I E 10 11 IX 11 14 dal KEYED NOTES-O GENERAL NOTES nRI dM.I I I i rOon I PROVIDE T SCHEDULE 40 PVC UNDERGROUND 1 THE TELECOMMUNICATION SHEETS SNOW DARTING OkQNTOdCItOITEM[ISSUE FOR MD TELECOMMUNI ATgRS CONDUIT ROUTE PARALLEL TO CONDITIONS THAT(LAVE BEEN PREPARED BASED ON ELEC TRI CAL CONDUIT YMEN POSSIBLE FIELD OBSERVATIONS AND 000RILL DRAWINGS ADDITIONAL COMPONENTS AND CONDITIONS THAT ARE 7 PROVIDE QUAD TE BDA NAMdIGIE FOR NOT SHOWN ON THE DRAWINGS MAY EXIST AND MAY TELECOMMUNICATIONS CABLING INSTALL ADJACENT REQUIRE CERTAIN D ON TILE D LINGOR ADJUSTMENTS THAT TO NEW CAMERA POLE AND ELECTRICAL HANDHOLE ARE LOCATIONS NOTEOP BELEXD DRAWINGS ENTAVD DEVICES WHERE FEASIBLE PROVIDE S'A'CONDUIT ROUTED TO LOCATIONS DRAWINGS PRIOR TIENTANGOEVUES A SNOYM ON THE DRAWINGS PRIOR TO BUD WG CAMERA PORE BASE FOR FOE CABLE SEE DETAIL 220-1115111 FOR NANDHOLE DETAIL 2. THE LOA/VOLALE CONTRACTOR SMALL SO THE AND BECOME FAMILIAR WITH THE EXISTINGCONDITION i EATPLNJECLLED Ni PART OF THE PRIOR TO COMMENCING UNLESSINDICATEDAS 1ETH.23RD STREET PROJECT EXISTING.ALL MATERIALS AND LABOR SHALL BE CONSIDERED NEW 4. PROVIDE DUAZITE BOA MANDNOLE FOR 3. NOT ALL EXISTING UTILITIES AND OR ELECTRICAL TELECOMMUNICATIONS CABLING INSTALL ADJACENT SYSTEMS ARE SHOWN ON PLANS CONTRACTOR IS TO FIELD PANEL AND ELECTRICAL HANDHOLE WHERE RESPONSIBLE FOR FIELD VERIFICATIONS OF ALL FEASIBLE.SEE DETAIL 3G.TNS01 FOR HANOHOLE DETAIL EXISTING CONDITIONS PRIOR TO COMMENCING VAR K. B AND SHEET 20.E.501 FOR FIELD PANEL DETAIL COORDINATE WITH THE MIME BEACH POLICE DEPARTMENT PRIOR TO COMMENCING WORK glitro7 • • ks. . ti e I IR y 3 :..,,yam *'h�q��I / • X71 ' 11.,a IrI�RI's 1I WC. N , Til..,{R �rl� tl II'tt'T. I N � dell�h I • O 4. J ✓ **14.;',4,:41,41. L ry •1 .V . Ter v A. ..� • 41111'44 T j. 4,' :TTIO, 9 J � '-Jv: :I:E,:: " iY� KEYPLAN a :n • _ IIP L,., ---- 1 _ ' h '.,` Jai rt I B..:: 41 y +..yam , f i+ YI� yy ,• Lars P H I p 41 :. VIII J .I.B•s.. � :y LDL` B F 7 o- f w p a .. I. .44 0 0 t 7441ty :EN i.''' 44,y :;;;,... ;,,, _ - ."kv, Aro, ,,IF 1, ' " iff • ^ .,P„N',.1 ' .. 1.:#, ' ...,. • ` DONNEL L 41" -�rryI 4 , �A.4;4ri': •• mi l. J �• �' I - �; IcwwB ateJI TMMO iia oo H • ry i / 1 ,J.0J ( it: e ', •, a T J 01117/70 A.ALLEN J • -,...: yJ I . I' , (*yid checked .. ♦ - CIRLOS L.CANNON f R ••� . .� .. `jr. MIAMI BEACH.FL i MIAMI BEACH PONCE SURVEILLANCETBLELOtl YUNICA7ION3 PLAN•AREA A O MIDDLE BEH TELECOMMUNICATIONS LAN-AREA A J 1 P*0 I amend 0 � u 10 ILDB120200cs .T +\ d,„i,, mn. 3-TN101 — A 1MNI MNSR 1 FM 3-161010n3-16101N I 2 1 A 5 5 7 S I 9 1--1W0 11 17 17 1. KETED NOTES \J GENERA,NOTES A° AM. OF I l..clµbn 0,1207170 CNG I TON!ISSUE FOR BID I PROVIDE T SCHEDULE HU PVC UNDERGROUND I THE TELECOMMUNICATION SHEETS SHOW ERISTING TELECOMMUNICATIONS CONDUIT.ROUTE PARALLEL TO CONDITIONS THAT NAVE BEEN PREPARED BASED ON ELECTRICAL CONDUIT WHEN POSSIBLE FIELD OBSERVATIONS AND ORIGINAL DRAWINGS ADDITIONAL COMPONENTS AND CONDITIONS THAT ARE 2 PROVIDE DUKITE BOR HANOHOLE FOR NOT SHOWN ON THE DRAWINGS NAY EXIST AND MAY RETELECOMMUNICATIONS CABLING.INSTALL ADJACENT TO ARE NOTUIRE NOTEDCERTAON THEN REMODELINGRAWIOR ADJUSTMENTS THAT NEW CAMERA POLE AND ELECTRICAL HANDHOLE WHERE ARE HOTEDONTNTING EQUIPMENT X09.FIELOVERIFYTNE FEASIBLE.PROVIDE Lf CONDUIT ROUTED TO CAMERA SHOWN R THEOF DRALL ZINGS IORTOBODING DEVICES A SHOWN ON THE DRAWINGS PRIOR TO BIOGINO POLE BASE FOR POE CABLE SEE DETAIL 797N001 FOR XANDHOLE DETAIL 2 THE LOW BECOMEVOLTAGEMILIAR WITH THE EXISTING THE SITE AND R TO CO mENCIN WITHK.THE LESS CONDITIONSAB 3 PROVIDE GUKITE BOX IWNOMOLE FOR PRIOR TO ALL MATERIALS ANK.AUNLESS9LLINDICATEDBEA9 TELECOMMUNICATIONS CABLING INSTALL ADJACENT TO ElUSDNL ALL MATERIALS AND LABOR SHALL BE FIELD PANEL AND ELECTRICAL HANDHOLE WHERE CONSIDERED NEW FEASIBLE.REE DETAIL 70-TNMTT FOR HRNDHOLE DETAIL S NOT ALL EXISTING UTILITIES AND OR ELECTRICAL AND SHEET 313.5.501 FOR FIELD PANEL DETAIL SYSTEMS ARE SHOWN ON PLANS CONTRACTOR 15 RESPONSIBLE FOR FIELD vERIFICATIONB OF ALL B EXISTING CONDITIONS PRIOR TO COMMENCING WORK. COORDINATE WITH THE MIAMI BEACH POLICE DEPARTMENT PRIOR TO COMMENCING WORK EtI "q.A.....:. .y _ ..R�'..•.,. .OM1 ,.Ar .. Ilelp A.-e1-..t.� 1.&L. ;JI''',111:411i4:"'4iE 10 • - •�•J;:jf o. c 4I7 YTMIYYYM41yLyM.ln 4wY.111E 7'IP.• ,� A �A �I JJ� 1.^.AI. 21 "l . ♦_ !4 • .1.64 .0.' `2S144V �l _ `.�.wr- /14'..:C w.. ` • r.'• Y't'•'• 1 d •.n Lau p 110 - ! - 1 • r,R L.VN:Fro 1.1011S•••••••040Tnom. 4 �.� •� t. I. i •N,NA j(• '•Vyl,• '`. 10, IL 1 I IIY 174 1� ,1.x•.is .14.;•• :.s! - F• 'F�iiL`.1�E1iC .• jn • 'AD...., t:. •• YN 4 ria • .1 ,•� •A a•' • r `:\ l� E i . I•`' �, f'• _ :IJP _`— { •.JIT zr KEYPLAN c. _ • • L, ATL 4• E.` '.. _••K . Nt.it,., ,, • N �MKc.a . n ' I. "Ile f •D. � c • • . • A F Mitt, E." f I Rf ♦®URNS y � ',..,t ls • ,ty f• I �MCDONNELl •.�'t-,`1 KANS.61611).0100 N • _. • ryt >'g.f • AALLEN Ai- I 114...• "4,4 .: ` ' P " s� � 471-1c.- • is • C ..-.4..*; �, .c NI N:•::. MI MI BEACH.FL 1 TELECOMMUNICATIONS MIAMI BEACH POLICE SURVEILLANCE PLAN•AREA 6 0 'ADDLE MEACN TELECOMMUNICATIONS PLAN.AREA B J 1 mofoct I wrow 170950 0440 uo FED `GiM9 : a..ngco Ow**3-TN10Z •-• ..A 1 1 .11..1 Of F 6O .T.....v.. 5 1102 A 1 3 S 4 I 0 I E I 0 10 11 14 II 14 KEYED NOTES:U GENERAL NOTES NR.I"'A,II I I Ana�Wn 1. UPROVIDE 7 SCHEDULE.O PVC UNDERGROUND I THE TELECOMMUNICATION SHEETS SHOW EXISTING EXISTING Oba+070yC14GrTON IISSUEFOR&D TELECOMIIUNICATIONS CONDUIT ROUTE PARALLEL TO CONDITIONS THAT HAVE BEEN PREPARED BASEDOH ELECTRICAL CONDUIT VM EN POSSIBLE FIELOOBSERVATIONS AND ORIGINAL DRAWINGS ADDITIONAL COMPONENTS AND CONDITIONS THAT ME 7 PROVIDE CORDITE NABNMDMOLE FOR NOT SIOWN ON THE DRAWINGS MAY EXIST MO KAY TELECOKYUNICATONS CABE RIG INSTALL ADJACENT TO ARERECINOT IRE NOTCE ED 1 THERELADRAWINELI NG R N]JUS TYENTS THAT - ARENOTMOTEHERANEINGEQUIP ENT/WE DEVICES MEASRSLE P OVI E AND ELECTRICALOB T ED CAMERA SRO.ONS OF DRAWINGS P500TY ENTMGDEVK:ES F, POLE RAE FOR E BSEE SOME 2 -I 301 FOR SIIONg1 ON TIE ORIIYMMOS PRK)R TO BIDDING POLE BABE FOR POE CABLE SEE DETAIL]/1TNS0t FOR HMONOLE DETAIL 2 THE 13ECOM L FADE FAMILIAR W AMR S ML LSTRIG ONDIT THE SITE AND N TO CO FN ASI N WAIN THE EXISTING C ATE°IONS a TELECOM UNICATIFOX MANGNCG INET WON TO ALIT ATLRIA WORK ANLES A BE AS TELECOMMUNICATIONS CABLING INSTALL ADJACENT To CONSIDERED WTERWBANO LABOR SNAILBE FIELD PANEL AND ELECTRICAL HANDNOLEVMERE CONSIDERED NEW FEASIBLE SEE DETAIL 20-Bo Ol FOR NANDHCLE DETAIL U. NOT ALL EXISTING UTILITIES AND CH ELECTRICAL AND SHEET 13E-SOT FOR FIELD PANEL DETAIL SYSTEMS ME SHOWN ON PLANS CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATIONS OF ALL B EXISTING CONDITIONS PRIM 10 CCMMENCING WORE ' COORDINATE VATH THE MIAMI BEACH POLICE DEPARTMENT PRIOR TO COMMENCING WORK •44A}11I '.Are. --.•:—...-..-,,,,,,, ,--.--.., r- ,. m y r ii r $ qdatir. e. c '!R - Mee•r rlti •' 4..r. - •f~11.- L1 r .' jM.IAI 1A •^TmkT .ry ��` -.-. .. '} .. a . .I1. t•• a i ..."'.- e•AjOr IIl1�I• •M..� •.{. e' • Y �'� 'X�rt'P.',� ^• • rte, :Gel '' s1....11.• 41611...:::::e. O uK ,Vii: :, I: h •• �` II-N�r� Mt: . r 3 • • 1 P :'�I '1:_{ n . ( *, — 'E.'• :rel• • i D:m I •. L� • V LM �!. L__ L '' Z , ) ;� ' KEYPLAN N; _ • 1 1l� • Imo,•.E1 4"r j .I I'I RAMC PH III IMIIS L I ' 11 4-— • • • �'1' .✓'"r M � . ♦ . -,� ��1 a •ImI mun Wr • -Lf ,: .'�• 'IES r� '3�• _ - ,� . -r '"•.•1+L..r�•~ �i :'ice' B A �� , I. r ! •1r + r 14. _T. I + II I — r ' '.7 • fri . fr , pl -.r • '• ' &MiDONNEIL i ,} MOOPARKWAY KANSAS S CI CITY.MO 041114 514.3334I03 n is .l . H.I. daa I 1 01117110 A ALLEN : &Awed MHV.d • —,..•..I„I T • C.11L05 L CANNON • { .5 +I . j .h.' ..r t'L. •• 1•'I wTSF /I• A„ F y MIMI BEACH.FL TELECOKMUNOATONB • MIAMI BEACH POLOS BURVEILLANCB 9y PLAN-AREA O • TELECOMMNICATIO ALM•AREA V O ....0. I.'""dR Ho _co t�GBbp f) P f1" , 3-TN103 — A I OH. CA 6.16 u T I ,NA}TAM Wig • 1 2 1 4 6 6 T I I 1 TO 11 IE 11 14 U GENERAL NOTES 132I07,24^P I.an. a I duiI itpl4140 RFYED NOTES 0 132I07,243�CKO ITDH'ISSUE FOR BID I PROVIDE I'SCHEDULE 40 PVC UNDERGROUND I THE TELECOMMUNICATION SHEETS SHOW EXISTING TELECOMMUNICATIONS CONDUIT.ROUTE PARALLEL TO CONOITIOMS THAT HAVE BEEN PREPARED BASE0 ON EL EC TRCAL CONDUIT%MIEN POSSIBLE FIELD OBSERVATIONS NI 0 ORIGINAL DRAWINGS ^NATIONAL COMPONENTS AND CONDITIONS THAT ARE 2 PROVIDE 01.10.211E BOX NAN 0000E FOR NOT SMONN ON THE ORAWIMGS WYEJUSTAND WY TELECOMMUNICATIONS CABLING INSTALL ADJACENT TO REQUIRE CERTAIN REMODELING OR ADJUSTMENTS THAT IFY.E NEWCAMERA FIXE AND ELECTRICAL IANDNOLE YHERE ACATIORE NOT NOTED AONA*TINTHE GEQUIP ENT ANDIELD DEVICES LOCATIONS OF DRAWINGS EQUIPMENT To 0AND DEVX:ES A FEASIBLEAPROVIDEFOE 1N-CONDUITFT...K -T CAMERA SNOLVN ON THE DRAYNNGS PRIOR TO DINING POLE BILE FOR POE CABLE.SEE OETNL]!i-lNSDI FOR NANDHOLE DETAIL 2 THE LOW VOLTAGE CONTRACTOR HE SHALL VISIT THE 611 E AND BECOME R WITH TK.U SIN CONDITIONS AS PROVIDE DUAERE ION XANDHOLE FOR PRIOR TO COMMENCINGLMATERIALS MO UNLESSRCSHALL BE TELECOMMUNICATIONS TELECOMMUNICATIONS CABLING.INSTIL.ADJACENT TO EXISTING,ALL AND LABOR gHAII BE FIELD PANEL AND ELECTR CAL HANOHOLE WHERE CONSIDERED NEW. FEASIBLE.SEE DETAIL I13.7N501 FOR HANDHOLE DETAIL 3 NOT ALL EXISTING UTILITIES AND OR ELECTRICAL AND SHEET 3/3'E.60I FOR FIELD PANEL DETAIL SYSTEMS ARE 01101AN ON PLANS CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATIONS OF ALL e EXISTING CONDITIONS PRIOR TO COMMENCING WORK COORDINATE W.THE MIAMI BEACH POLICE DEPARTMENT PRIOR TO COMMENCING WORK •-.r'..".,FA...--;: d ar.r ``rrff�. �{�'� ♦IFI+ c7,..,...,•..•....." ',.;�1ti -, .o• „, or♦ ~qtr . J.o MINA^ M.- Irwr 1251 -011jF,' r ♦ P. LA �Aw .R a ,. ' •'.e� � -'r. �Y1'P11k' 4 • :••' ►'i '.oM.••••• • ••••pal .wa 4T 5�� b I?. • •'4L t-`. - H ry r6M•r.It h., •Ip.µ �t �I I' 4 • IOL ' .. :OF4: ,;HI>X. W r,r '�.• . . (40e-`N 11 j gA JIA '4"4::',::..,"",'.' F1 .a • hr Iti:. •••,itigir • v�6 ' .r- KEYPLAN et ilit 54.n.nF.inlnLF r .., ••PS ifr . , ..• .l :.,,c,,,,-,,,,, : : C B A 1= f - .• - . '''..• 1� 'Fr -..- kauRNS i • 411111 WARD PARKWAY i . WW56 M1Si'W 6.114 H - -. dL drteid •1•J'F• 01(1700 A ALLEN d • ,. C 1(105 1 CANNON Y �A I ii , 1 .,:. ' I 'I -A MIAMI BEACH.FL TELECOMMUMICATgNfi MI4BEACH POLICE SURVEILLANCE PL4N�iR[AQ O 01 BEACHMIDDLE TELECOMMUNICATIONS LAN•AREA U '0 A01Fd I aIMAd 19180 \ a 1«.M j L MN0I 01 ..YY 1/..•131/..•13Mm_,_ I NF 3TNIW dAp _ t 2 1 a E E 7 E I E TD 11 12 II I• not bH I In I WO I bmalpIon D 10=7,24 CKGI TON'ISSUE FOR RID A SAICUT Cr FASTING a-COMPACTED ASPHALT FOR TRENCHING ASPHALT(MATCH MATCH FASTI MATCH EASTNO EXISTING TYPE) FINISH RADENG FINISH GRADE >•� R . VKV MO pAL 9m • �� .. LOCATOR TAPE <11P...4 ;., ;`• LOCATOR TAPE `I tm �` ; ;.. RI..R `4 �� 'II' , NMNONOLE REpllREMOITI ,o `• IINtE....•". ELECTRMULL CONDUIT wdn.WPC 1,b�E••L M•atr.= ...•Coos nao26D `I/t`;.`; ELECTRICAL CONDUIT �;,1'`' 70 E Y T stony M�n[r�m•tslT HdIN oI o tm�wL 0 �•.'�'t��• `'i=il ,� ( 1 LW4•FM.MA PML•116140 a IMO.NOLO v IC LL6 MI MOM to PP• • J 1 NPR V.=PUL RH 40.9A1. • Mau..IR L lir.M.I _� ELECTRICAL CONCUR ELECTRICAL CONCEIT .• niont N LABOR UlCEM ROADWAY 1"RUE o1 y�rm.SITCCA M MM.....m•oat ltS J Aron 10 MR MwED TELECOMMUNICATIONS CONDUIT PLACEMENT, D a DIRECTIONAL BORING 2 TYPICAL TELECOMMUNICATIONS HANDHOLE DETAIL 1 y MOTTO SCALE ``J NOT TO SCALE -5 E i E • 0 ..: CABLE ID OILNT UIT[, TYPE-_ DESCRIPTION _ _ SIIiANO CATS STP 1OSP.UNSHIELDEO,SUPERIOR ESSEX BOO SERIES ON EQUAL •STRAND SINOL E....ODE OUTSIDE RANT CAME t► NOTES RNS M SEE TY SERIES DRAWNGS FOR SECURITY ONE LINE `�tONNELI. SLAG RAMS DMA VwAD PARKWAY KANSAS9d Salta H deb &tied 10 NEAT FIELD PANEL (lUlan TO NEAT FIELD PANEL 01117R0 A ALLEN &Aped d.rtid C 10OS L CANNON Y 32 1 I BPROVIDE ONE CABLE FOR EACH iCAMERA SHOWN ON RAN MIAMI REACH.FL J MIAMI REACH POLAR SURVEILLANCE MIDDLE BEACH TELECCMMUNCAT IONS DETAILS O TYPICAL FIELD PANEL AND CAMERA WIRING DIAGRAM 3 NOT TO SCALEA 170°00 I � R LDawlnO 13-TN501 — A Moe o1 M.•.. I.5-TN50I d.R