Loading...
R7 A First_Street_Presentation_7.7.2020PUBLIC WORKS DEPARTMENT OUTLINE PUBLIC WORKS DEPARTMENT Rain Flooding ` Rain Flooding `` King Tide Flooding –09/30/2019 ` Artesian Wells `` • • • • • • • • PUBLIC WORKS DEPARTMENT 1st Street Typical Section-Option 1 Road elevation raised to 3.7’ NAVD Bicycle Lanes Improved Parking/Valet Arrangement Proposed Landscaped Median Pros •Least impact to parking Cons: •Less greenspace/sidewalk area 1st Street Typical Section-Option 2 Road elevation raised to 3.7’ NAVD Shared Bicycle Lanes Improved Parking/Valet Arrangement Undivided Two-way Traffic Pros •Ample greenspace and sidewalk Cons: •Loss of parking Proposed Stormwater System 84” Stormwater Pipe Alton Road 60”-96” Stormwater Pipe Washington Ave Pump Station 120,000 gpm Outfall 84”-96” Stormwater Pipe First Street PS Alternative Locations Considered ` Pump Station Layout Pump Station (Below Ground) Outfall Elec. & Generator Equip. (Above Ground) Apogee South Pointe Park Murano at Portofino Portofino Tower Pump Station Above Ground Components ` Without Screening With Screening View from Proposed Above Ground Equipment PUBLIC WORKS DEPARTMENT • • • • • • • • • • • • • • • • • • • • • • • • • • • • Miami Beach worked with a team of experts led by the national climate adaptation planning consultant, ICF, to gather data, create models, and combine information to understand the economic impact of reducing flood risk. PUBLIC WORKS DEPARTMENT