R7 A First_Street_Presentation_7.7.2020PUBLIC WORKS DEPARTMENT
OUTLINE
PUBLIC WORKS DEPARTMENT
Rain Flooding
`
Rain Flooding
``
King Tide Flooding –09/30/2019
`
Artesian Wells
``
•
•
•
•
•
•
•
•
PUBLIC WORKS DEPARTMENT
1st Street Typical Section-Option 1
Road elevation raised to 3.7’ NAVD
Bicycle Lanes
Improved Parking/Valet Arrangement
Proposed Landscaped Median
Pros
•Least impact to parking
Cons:
•Less greenspace/sidewalk area
1st Street Typical Section-Option 2
Road elevation raised to 3.7’ NAVD
Shared Bicycle Lanes
Improved Parking/Valet Arrangement
Undivided Two-way Traffic
Pros
•Ample greenspace and sidewalk
Cons:
•Loss of parking
Proposed Stormwater System
84” Stormwater
Pipe Alton Road
60”-96” Stormwater
Pipe Washington
Ave
Pump Station
120,000 gpm
Outfall
84”-96” Stormwater
Pipe First Street
PS Alternative Locations Considered
`
Pump Station Layout
Pump Station
(Below Ground)
Outfall
Elec. & Generator
Equip.
(Above Ground)
Apogee
South Pointe Park
Murano at
Portofino
Portofino
Tower
Pump Station Above Ground Components
`
Without Screening
With Screening
View from Proposed Above Ground Equipment
PUBLIC WORKS DEPARTMENT
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Miami Beach worked with a team of experts led by the national climate adaptation planning consultant, ICF, to
gather data, create models, and combine information to understand the economic impact of reducing flood risk.
PUBLIC WORKS DEPARTMENT