2020.07.29 Alton-Venetian Project PresentationAlton Substation and Underground Transmission Line Christopher Ferreira and Cara Smith Florida Power & Light Company 2 FPL Power Delivery infrastructure 1.3 million poles and structures 925,948 transformers 661 substations 75,000 miles ofpower lines Serving more thanhalf of Florida 3 ►Connect high voltage transmission lines with main and neighborhood power lines ►Decrease voltage of electricity for safe distribution to homes and businesses ►Assist with isolating parts of the energy grid to minimize the impact to customers during outages ►Acts as a circuit breaker to protect the energy grid Functions of substations 4 ►Façade has been designed to complement the surrounding community infrastructure ►Substation exterior was designed by renowned architect Kobi Karp and was approved by the Miami Beach Design Review Board ►Transmission power lines will be placed underground ►Unmanned facility will operate quietly and blends in with the neighborhood New Alton Substation Project Details 5 New Underground Transmission Line ►Installation of a new underground transmission line will provide enhanced benefits for customers in Miami Beach ►Some of the benefits customers will enjoy: »Enhanced reliability of service »A more resilient electric grid »Two underground transmission lines serving Miami Beach customers ►Project timeline has included “no work” periods that the city of Miami Beach requires for high impact events ►We plan for the majority of work to take place during daytime hours and to observe a Monday through Saturday work schedule ►Personnel working at the site will follow all protocols and guidelines established by the CDC and city of Miami Beach in regards to COVID-19 6 Miami Beach –Alton –Venetian Underground Transmission Line Route •Miami Beach Substation •New Alton Substation •Venetian Substation 7 Miami Beach Substation 8 New Alton Substation Location 9 Venetian Substation 10 Miami Beach –Alton –Venetian Underground Transmission Line Route •Miami Beach Substation •New Alton Substation •Venetian Substation 11 Site Prep Fall 2020 –Spring 2021 Substation Construction Spring 2021 – December 2021 Building Construction Spring 2021 –Fall 2021 In-service* December 2021 New Alton Substation Timeline What to expect ►Site preparation: To prepare the site, a storm water draining system and infrastructure foundations for the substation perimeter walls and concrete building, or relay house, will be set. Construction work and heavy equipment will be on the site. Traffic may be affected during delivery of equipment and materials. ►Building construction: The stylishly-designed relay house will contain the electrical equipment inside of the substation. The building’s façade was designed by renowned architect Kobi Karp. ►Substation construction: The construction of the electrical components inside the substation’s infrastructure requires the delivery of heavy equipment on-site. ►In -service:Once construction is complete and the substation is energized, there will be no visible equipment. The substation will operate quietly and unmanned. Once a month, two -man crews will access the property for maintenance. * Timeline is subject to change. 12 Civil Work Late Summer 2020 – Summer 2021 Restoration Work Fall 2021 – December 2021 Electrical Work Spring 2021 –Fall 2021 In-service* December 2021 Underground Transmission Timeline What to expect ►Civil work: To place the transmission lines underground, FPL uses directional boring technology, which is a low-impact underground drilling method. This phase will include trenching and installing manholes. ►Electrical work: Electrical cable is pulled into the conduits, connected to the substation equipment and terminals are installed at the Miami Beach, Venetian and the new Alton Substation. ►Site restoration: The substation will have landscaping upgrades, an improved irrigation system, and will include sidewalk and asphalt repairs. ►In -service:Once construction is complete and the underground transmission line is energized, the new substation, together with the existing Miami Beach and Venetian Substations, will provide enhanced service reliability to the city of Miami Beach. * Timeline is subject to change. 13 Community Outreach ►Reaching out to customers along the project route »Send letters to each resident with FPL project information and point of contact »Have an FPL employee available at the project site to provide residents with information »Provide a phone number to call for questions or concerns regarding the project ►Working with community stakeholders to gather input and answer questions »City of Miami Beach: ›Public Works Department ›Parks Department ›Office of the Mayor and City Commission »Neighborhood Associations: ›Flamingo Park ›Sunset Harbor ›South of Fifth »South Pointe Elementary PTA