Loading...
064-1999 LTC CITY OF MIAMI BEACH CITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH FLORIDA 33139 OFFICE OF THE CITY MANAGER TELEPHONE: (305) 673-7010 FAX: (305) 673-7782 LETTER TO COMMISSION DATE: March 12, 1999 L.T.C NO. 64-1999 SUBJECT: Mayor Neisen O. Kasdin and Members of the City Commission Sergio Rodriguez 4 City Manager /~ ALLISON ISLAND STREET IMPROVEMENT PROJECT TO: FROM: Following discussions at the March 3, 1999 Commission Meeting, I conducted an inspection of Allison Island in the company of key City staff. Present were representatives of Public Works, Parks, Sanitation and Property Management as well as the City Manager's office. The attached photos depict the existing conditions on the morning of March 4, 1999 (Attachment No.1). The photos also illustrate the present conditions of the Island upon completion of the corrective action taken by City staff at the Island. The following summary by area, indicates what has been accomplished (Attachment No.2): AREA 1 A large area of trash and tree clippings was found in the median across from 6650 Allison Road. This was removed by the Sanitation Department. A piece ofPVC conduit was also removed from this area. Two small pieces of pipe were removed from the median across from 6550 Allison Road. AREA 2 An empty FPL conduit was cut to grade and a section of pipe was removed from the median across from 6444 Allison Road. AREA 3 A medium size area of dead shrubs and tree clippings was found in the median across from 6341 Allison Road. This was removed by the Sanitation Department. Several small pieces of debris were removed from the median in this area. The area in front of the guardhouse was graded and raked clean. Property Management has also pressure cleaned the sidewalk and wall at the front entrance to the Island. GENERAL The Parks Department raked leaves, removed rocks from the medians and trimmed the existing trees and palms. The Public Works and Sanitation Departments swept and picked up debris left behind from the undergrounding of the utilities. The roadway has been swept clean. All holes have been filled and the road repaved with new asphalt. The recently installed drainage gutters were swept clean. The areas left open for the proposed drainage structures have been filled and paved. The Parks Allison Island Street Improvement Project Letter to Commission-March 12, 1999 Page 2 Department cleaned, trimmed and mulched the landscaping at the entrance. Additionally, we have contacted Mr. Philip Grabarnick of 6480 Allison Road regarding a problem with an outfall drainage pipe at his address. The Public Works Department will correct the problem. A final walk-thru of the Island with representatives of the three utility companies, FPL, BellSouth and Cablevision has been scheduled to address any remaining unfinished items. The activities listed below describe the remaining work to bring the project to completion. TREE REMOV AL The removal of the existing trees will be completed in the month of March. A tree removal permit from DERM has been obtained. DRAINAGE IMPROVEMENTS The drainage portion of the improvements has been advertised for bids with a bid opening date of March 22, 1999. A permit from DERM was obtained by the City prior to the decision to advertise the project for bids. The construction is scheduled to begin in late April or early May and be completed in June. LANDSCAPING The modifications to the landscaping plans are being developed, addressing the substitution of the Royal palms included in the current design with Medjool palms as requested by the residents and Commission. A refund check associated with the undergrounding work performed by FPL in the amount of$188,045.30 is available to implement these modifications. The landscaping plans will then be advertised for bids with installation occurring in July and August. FINAL PAVING The final paving and the installation of a new curb around the medians will be done by City forces in September after completion of all other components of the project. In addition, the Code Compliance Department has visited the area and notified the neighbors to refrain from disposing trash and/or construction debris on the medians in the future. SRlC~JGdP/JECh/JDP F: I WORKI$ALL IDEP AZOSJIALLISON\MEMOSI3-17 -99 . LTC Attachments c: Christina Cuervo, Assistant City Manager Janet Gavarrete, Assistant City Manager Ronnie Singer, Executive Assistant to the City Manager Kevin Smith, Parks & Recreation Director Robert Thomas, Sanitation Director Brad Judd, Property Management Director Julio Grave de Peralta, Public Works Director Jorge Chartrand, Capital Projects Coordinator John De Pazos, Construction Manager ATTACHMENT NO.1 FOUR PAGES Allison Island Before (3/4/99) After (3/1 0/99) ~.."'. ~. ..1....~ '...7-._' . ," ." -- p. '~ j; r': ~ i ,tj:", (1) Before (3/4/99) 1"~-;.J ~ .' After (3/1 0/99) ........- ~~~~~,~.~~,~;.~.--j!:.:~.-~ . ~.:.L'::i1r..:;.~ . ~iJ"Jt.;1l;;. .' .,.:.~M~~-.- r:;;:~-?' .'..t ," (2) Before (3/4/99) After (3/1 0/99) ~.:c ;",,-,":" :" '"';',, ....."".- , ,. -~. ...~,"~- ,'-. ',"'~ . -,,~.' , , ~.~.."~~:-~~--'~ -~. 'rr I:.:~\. .. r~';(if;.r;:I/, ~'r ",', ,:,,'l"""J.~>' I ,'" .~...J' . <,_~"" ',~<f.'~ ",' , " ~ '~ ~ (3) Before (3/4/99) After (3/1 0/99) ""'0- ". 1'" .~~~ I "1J>i'>"/. ~~f,--"l ~~l~(";, ~~? ',.),..', ',' 1"......._, . '1.tl 1'~,.. ~~.~,~ .:,~', "~;: ."'~.' ". .:.y ~', .,..,,,..,~.. '. ~,.'_. - ;'~,. .'. ....',... ,",:.",., ~:' ' ~'\ " ~: ~.',n........~".,: i,'~r~'C'l"-~flr: ~::..:'}{.P,! i'.\-,'.M~~ , 't\-.:/~l~itl ~~" 1 ;"",~\ ,,- ','J (4) :"s,":;:;""'"~::' .. ,.,.."... i; -