Agenda & Handouts_12-17-20 General Obligation Bond Oversight Committee City of Miami Beach Karen Rivo, Chair Maria Hernandez, Liaison AGENDA – VIRTUAL MEETING December 17, 2020 I. Roll Call and Introductions All 4:30pm II. Committee Business Karen Rivo 4:35pm • Adoption of Meeting Minutes from 10-22-20 • 2021 Meeting Calendar Approval • GO Bond Committee Reappointments III. Public Comment Public 4:40pm IV. Program General Status, & Maria Hernandez/ 4:50pm Sub-Projects Update, Closed Projects John Woodruff • Future Revision to Implementation Plan V. 41st Street Corridor Final Presentation: AECOM 5:00pm https://www.miamibeachfl.gov/residents/neighborhood-associations/neighborhood-affairs-division/active-projects/other/41-street-revitalization/ VI. Major Tranche 1 Projects Update CIP - D. Martinez 5:30pm • F.S. #1, 72nd St. Complex, Bayshore Park, Middle Beach Beachwalk, NBOC Beachwalk VII. Other Projects Update PWD / T & T / ENV / 5:50pm • Streets & Sidewalks, Bollards, Nautilus Traffic Parks / CIP Calming, Street Tree Master Plan, Fairway Park Fence, Palm & Hibiscus VIII. Quick Wins Remaining Police / Fire 6:10pm • Lummus Cameras, Beachwalk Cameras, Public Safety Radio System IX. Public Comment Public 6:20pm X. Adjournment 6:30pm Committee Charge The purpose of the General Obligation Bond Oversight Committee is to make advisory recommendations to the City Manager and City Commission from a macro perspective regarding the timely progress, overall goals, costs, including financial efficiencies, and the timely completion of General Obligation Bond Program projects approved by the voters in the City of Miami Beach Special Election held on November 6, 2018. The Committee shall have the following powers & duties: 1. Receive input from the public, the City Administration, City consultants, and the City’s Inspector General, as needed, to make recommendations relative to the overall timing, cost efficiencies, and prioritization of the G.O. Bond Program projects. 2. Provide general oversight to ensure that G.O. Bond Program project timelines, budgets (including cost efficiencies) are prioritized and achieved, and that the projects are completed in accordance with the scope of work approved by the voters. 3. Review City staff and G.O. Bond Program project managers’ progress reports and provide monthly reports to the City Commission. General Obligation Bond Oversight Committee Meeting Calendar 2021 MEETING LOCATION: VIRTUAL ZOOM MEETINGS UNTIL FURTHER NOTICE Thursday, January 21, 2020 - 4:30pm Thursday, February 18, 2020 – 4:30pm Tuesday, March 25, 2020 – 4:30pm Thursday, April 29, 2020 – 4:30pm Thursday, May 20, 2020 – 4:30pm Thursday, June 17, 2020 – 4:30pm July Meeting Date - TBD August 2020 – Recess September Meeting Date - TBD October Meeting Date - TBD November Meeting Date - TBD December Meeting Date - TBD SECTION II G.O. BOND PROJECT LIST BY PHASE Active Phase Project Name Category Department Quick Win Tranche Anticipated End Date ↑Count % Count $ Budget $ Encumbered $ Spent % Spent $ Available Closed #53 PORTABLE BOLLARDS Public Safety Police QW 1 07-31-2019 1 1%600,000 - 599,915 1.81%84 Closed #17 POLO PARK Parks Parks & Recreation QW 1 08-11-2019 1 1%499,998 - 493,673 1.49%6,325 Closed #19 SOUNDSCAPE 4K TECHNOLOGY Parks Tourism & Culture QW 1 09-30-2019 1 1%3,799,999 - 3,748,495 11.29%51,503 Closed #13 NORTH SHORE LIGHTS & PAINT Parks Property Management QW 1 10-14-2019 1 1%130,300 - 130,210 0.39%89 Closed #52 TATUM PARK LED LIGHTING Public Safety Parks & Recreation QW 1 10-14-2019 1 1%151,999 - 52,758 0.16%99,240 Closed #52 CRESPI PARK LED LIGHTING Public Safety Parks & Recreation QW 1 10-21-2019 1 1%86,999 - 41,780 0.13%45,218 Closed #52 STILLWATER PARK LED LIGHTING Public Safety Parks & Recreation QW 1 10-21-2019 1 1%86,999 - 41,780 0.13%45,218 Closed #26 COLONY THEATRE ROOF Parks Property Management QW 1 10-24-2019 1 1%300,000 - 299,650 0.90%350 Closed #21 STILLWATER PARK Parks Parks & Recreation QW 1 11-08-2019 1 1%144,999 - 142,440 0.43%2,559 Closed #3 CRESPI PARK Parks Parks & Recreation QW 1 11-09-2019 1 1%210,998 - 184,919 0.56%26,079 Closed #18 SCOTT RAKOW PAINT Parks Property Management QW 1 11-12-2019 1 1%130,000 - 116,776 0.35%13,224 Closed #47 MACARTHUR CSWY READERS Public Safety Police QW 1 11-28-2019 1 1%120,000 - 64,904 0.20%55,095 Closed #52 NORMANDY ISLE PARK LED LIGHTING Public Safety Parks & Recreation QW 1 12-02-2019 1 1%715,000 - 212,593 0.64%502,405 Closed #18 SCOTT RAKOW HVAC Parks Property Management QW 1 12-06-2019 1 1%150,000 - 137,302 0.41%12,697 Closed #13 NORTH SHORE ROOF Parks Property Management QW 1 12-16-2019 1 1%375,000 - 374,722 1.13%276 Closed #18 SCOTT RAKOW ROOF Parks Property Management QW 1 01-05-2020 1 1%1,124,000 - 127,217 0.38%996,782 Closed #26 MIAMI CITY BALLET ROOF Parks Property Management QW 1 01-15-2020 1 1%760,000 - 758,824 2.29%1,175 Closed #13 NORTH SHORE CAMERAS Parks Property Management QW 1 02-04-2020 1 1%205,699 - 60,858 0.18%144,841 Closed #18 SCOTT RAKOW CAMERAS Parks Property Management QW 1 02-05-2020 1 1%250,000 - 110,659 0.33%139,340 Closed #32 PALM & HIBISCUS LANDSCAPING Infrastructure Capital Improvement Projects QW 1 03-25-2020 1 1%1,000,000 - 1,000,000 3.01%- Closed #18 SCOTT RAKOW WINDOWS Parks Property Management QW 1 04-16-2020 1 1%699,999 - 194,601 0.59%505,396 Closed #26 FILLMORE ROOF Parks Property Management QW 1 05-15-2020 1 1%1,920,000 - 1,874,154 5.65%45,844 Closed #4 FAIRWAY PARK PAVILION Parks Parks & Recreation 1 05-15-2020 1 1%50,000 - 35,044 0.11%14,955 Closed #2 COLLINS PARK Parks Parks & Recreation QW 1 05-28-2020 1 1%640,000 - 557,286 1.68%82,713 Closed #13 NORTH SHORE GENERATOR Parks Property Management QW 1 06-30-2020 1 1%524,999 - 503,861 1.52%21,138 Closed #18 SCOTT RAKOW GENERATOR Parks Property Management QW 1 06-30-2020 1 1%816,000 - 729,717 2.20%86,281 Closed #47 71 ST. ENTRANCE READERS Public Safety Police QW 1 07-12-2020 1 1%240,000 - 31,582 0.10%208,417 Closed #47 JULIA TUTTLE CSWY READERS Public Safety Police QW 1 09-21-2020 1 1%200,000 - 89,185 0.27%110,814 Closed Sum 28 38%15,932,988 - 12,714,905 38%3,218,058 Closed Count 28 38%28 28 28 0.00%28 Complete #18 SCOTT RAKOW POOL Parks Parks & Recreation QW 1 07-06-2020 1 1%977,998 36,936 928,378 2.80%12,684 Complete Sum 2 3%977,998 36,936 928,378 3%12,684 Complete Count 1 1%1 1 1 0.00%1 Construction #57 LUMMUS PARK/OCEAN DRIVE CAMERAS Public Safety Police 1 01-22-2021 1 1%815,000 124,245 665,155 2.00%25,599 Construction #56 CAMERAS- BEACHWALK Public Safety Police 1 01-29-2021 1 1%700,000 490,067 192,190 0.58%17,742 Construction #49 PUBLIC SAFETY RADIO SYSTEM Public Safety Fire QW 1 02-26-2021 1 1%9,700,000 2,038,911 7,595,974 22.89%65,114 Construction #4 FAIRWAY PARK FENCE Parks Parks & Recreation 1 02-26-2021 1 1%210,000 182,779 - 0.00%27,221 Construction #42 NAUTILUS TRAFFIC CALMING Infrastructure Transportation QW a 1 04-14-2021 1 1%739,499 188,746 536,227 1.62%14,526 Construction #24 MIDDLE BEACH BEACHWALK PH3 Parks Capital Improvement Projects 1 06-16-2021 1 1%4,500,000 2,698,083 1,448,379 4.36%353,535 Construction #33 PART 1 TREE PLANTING Infrastructure Environmental QW a 1 04-01-2022 1 1%2,500,000 217,248 641,277 1.93%1,641,474 Construction #37 PART 1 SIDEWALKS Infrastructure Public Works Department QW a 1 04-01-2022 1 1%3,500,000 1,257,430 1,879,231 5.66%363,337 Construction #38 PART 1 STREETS Infrastructure Public Works Department QW a 1 04-01-2022 1 1%7,500,000 4,865,159 1,949,739 5.87%685,101 Construction Sum 36 49%$30,164,499 $12,062,668 $14,908,172 45%$3,193,649 Construction Count 9 12%9 9 9 0.00%9 CITY OF MIAMI BEACH 12/11/2020 - 10:17 AM SECTION IV G.O. BOND PROJECT LIST BY PHASE Design #40 41 STREET LIGHTING UPGRADES Public Safety Public Works Department 1 02-28-2021 1 1%85,177 - - 0.00%85,177 Design #53 CONVENTION CENTER BOLLARDS Public Safety Public Works Department 1 04-06-2021 b 1 1%775,000 45,449 - 0.00%729,551 Design #53 SOUNDSCAPE PARK BOLLARDS Public Safety Public Works Department 1 04-06-2021 b 1 1%375,000 45,449 - 0.00%329,551 Design #53 SOUTH POINTE PARK BOLLARDS Public Safety Public Works Department 1 04-06-2021 b 1 1%250,000 45,449 - 0.00%204,551 Design #48 PART 1 POLICE HQ Public Safety Property Management 1 06-01-2021 b 1 1%4,000,000 707,892 405,370 1.22%2,886,737 Design #18 SCOTT RAKOW GYM FLOORS Parks Parks & Recreation 1 06-01-2021 1 1%300,000 16,415 - 0.00%283,585 Design #12 N. BEACH OCEANSIDE BEACHWALK Parks Capital Improvement Projects 1 04-04-2022 1 1%1,999,999 129,893 70,057 0.21%1,800,049 Design #42 BAYSHORE SOUTH TRAFFIC CALMING Infrastructure Transportation 1 04-15-2022 1 1%560,148 11,586 34,114 0.10%514,447 Design #42 NORMANDY ISLE TRAFFIC CALMING Infrastructure Transportation 1 04-15-2022 1 1%113,999 13,613 23,720 0.07%76,666 Design #42 PALM VIEW TRAFFIC CALMING Infrastructure Transportation 1 04-15-2022 1 1%86,349 - 4,883 0.01%81,466 Design #39 PART 1 SEAWALLS/SHORELINES Infrastructure Public Works Department 1 04-29-2022 1 1%7,999,999 652,885 185,493 0.56%7,161,619 Design #43 ALTON ROAD SHARED USE PATH Infrastructure Transportation 1 06-29-2022 b 1 1%170,000 - - 0.00%170,000 Design #9 MARJORY STONEMAN DOUGLAS PARK Parks Parks & Recreation 1 10-27-2022 1 1%681,999 850 13,788 0.04%667,360 Design #43 23 ST. STREETSCAPE IMPROVEMENTS Infrastructure Capital Improvement Projects 1 12-26-2022 1 1%1,500,000 - 4,990 0.02%1,495,010 Design #10 MAURICE GIBB PARK Parks Capital Improvement Projects 1 01-06-2023 1 1%3,300,000 - 37,714 0.11%3,262,284 Design #43 CHASE AVE/34 ST SHARED USE PATH Infrastructure Capital Improvement Projects 1 02-02-2023 1 1%830,000 - - 0.00%830,000 Design #15 PAR 3 / BAYSHORE PARK Parks Capital Improvement Projects 1 03-08-2023 1 1%15,699,999 42,547 672,090 2.03%14,985,360 Design #23 PEDESTRIAN BRIDGE Parks Capital Improvement Projects 1 06-28-2023 1 1%10,000,000 8,547,268 1,249,043 3.76%203,687 Design #45 FIRE STATION #1 Public Safety Capital Improvement Projects 1,2 12-29-2023 1 1%7,000,000 1,026,593 126,088 0.38%5,847,317 Design Sum 95 130%$55,727,669 $11,285,889 $2,827,350 9%$41,614,417 Design Count 19 26%19 19 19 0.00%19 Planning #19 SOUNDSCAPE RESTROOMS/STORAGE Parks Parks & Recreation 1 01-29-2021 b 1 1%699,999 - - 0.00%699,999 Planning #40 PART 1 REVITALIZE 41 STREET Infrastructure Economic Development 1 01-29-2021 b 1 1%1,414,823 221,365 26,300 0.08%1,167,158 Planning #55 PART 1 STREET LIGHTS Public Safety Public Works Department 1 02-26-2021 b 1 1%5,000,000 - 10,108 0.03%4,989,892 Planning #50 ALTON RD. CORRIDOR CAMERAS Public Safety Police 1 03-02-2021 b 1 1%211,999 - 15,999 0.05%195,999 Planning #50 41 ST. CORRIDOR CAMERAS Public Safety Police 1 03-31-2021 b 1 1%235,324 - 17,999 0.05%217,324 Planning #50 71 STREET CORRIDOR CAMERAS Public Safety Police 1 03-31-2021 b 1 1%211,999 - 15,999 0.05%195,999 Planning #50 DADE BLVD. CORRIDOR CAMERAS Public Safety Police 1 03-31-2021 b 1 1%165,674 - - 0.00%165,674 Planning #57 COLLINS AVE/WASH AVE CAMERAS Public Safety Police 1 03-31-2021 b 1 1%675,000 10,581 140,410 0.42%524,007 Planning #47 OTHER READERS CITYWIDE Public Safety Police 1 04-01-2022 1 1%1,390,000 30,547 38,315 0.12%1,321,136 Planning #8 LUMMUS PARK Parks Parks & Recreation 1 12-30-2022 b 1 1%4,737,000 - 10,800 0.03%4,726,199 Planning #1 72 ST. COMMUNITY COMPLEX Parks Capital Improvement Projects 1, 2 12-03-2023 1 1%10,800,000 494,467 1,534,592 4.62%8,770,940 Planning #30 SKATE PARK Parks Parks & Recreation 1 (blank)1 1%750,000 - - 0.00%750,000 Planning Sum 72 99%$26,291,818 $756,960 $1,810,522 5%$23,724,327 Planning Count 12 16%12 12 12 0.00%12 Pending #54 MARINE PATROL FACILITY Public Safety Capital Improvement Projects 1 (blank)1 1%2,700,000 - - 0.00%2,700,000 Pending #5 FLAMINGO YOUTH CENTER FACILITY Parks Capital Improvement Projects 1 (blank)1 1%15,400,000 - - 0.00%15,400,000 Pending #29 PART 1 WEST LOTS Parks Economic Development 1 (blank)1 1%1,000,000 - - 0.00%1,000,000 Pending #13 NORTH SHORE PATH & FIELDS Parks Parks & Recreation 2 (blank)1 1%2,944,000 - - 0.00%2,943,999 Pending Sum 28 38%$22,044,000 $0 $0 0%$22,043,999 Pending Count 4 5%4 4 4 0.00%4 73 100%$151,138,972 $24,142,453 $33,189,327 100%$93,807,134 CITY OF MIAMI BEACH 12/11/2020 - 10:17 AM QWa = The quick-win portion of this project is complete. b = The anticipated end date is of the phase, not of the entire project. PROGRAM PROGRESS UPDATE G.O. Bond Oversight Committee December 17, 2020 www.GOMBInfo.com SECTION IV www.GOMBInfo.com www.GOMBInfo.com www.GOMBInfo.com www.GOMBInfo.com www.GOMBInfo.com TOTAL SAVINGS TO DATE Category Projects $ Budget $ Savings % Infrastructure 1 1,000,000 -0% Parks 20 13,709,990 2,164,251 16% Public Safety 8 2,200,997 1,066,491 48% TOTAL 29 16,910,987 3,230,742 19% G. O .  BO N D  PR O J E C T  LI S T  ‐   SA V I N G S Ac t i v e  Ph a s e C a t e g o r y P r o j e c t  Na m e Qu i c k  Wi n T r a n c h e C o u n t  $ Bu d g e t    $  En c u m b e r e d    $ Sp e n t    $ Av a i l a b l e   Cl o s e d I n f r a s t r u c t u r e # 3 2  PA L M  & HI B I S C U S  LA N D S C A P I N G        QW 1 1              1, 0 0 0 , 0 0 0              ‐                                 1, 0 0 0 , 0 0 0              ‐                  In f r a s t r u c t u r e  Su m 1              1, 0 0 0 , 0 0 0              ‐                                 1, 0 0 0 , 0 0 0              ‐                  Cl o s e d P a r k s #1 7  PO L O  PA R K QW 1 1              49 9 , 9 9 8                    ‐                                 49 3 , 6 7 3                    6,325                        Cl o s e d P a r k s #1 9  SO U N D S C A P E  4K  TE C H N O L O G Y              QW 1 1              3, 7 9 9 , 9 9 9              ‐                                 3, 7 4 8 , 4 9 5              51,503                    Cl o s e d P a r k s #1 3  NO R T H  SH O R E  LI G H T S  & PA I N T          QW 1 1              13 0 , 3 0 0                    ‐                                 13 0 , 2 1 0                    89   Cl o s e d P a r k s #2 6  CO L O N Y  TH E A T R E  RO O F                        QW 1 1              30 0 , 0 0 0                    ‐                                 29 9 , 6 5 0                    350                                Cl o s e d P a r k s #2 1  ST I L L W A T E R  PA R K                                QW 1 1              14 4 , 9 9 9                    ‐                                 14 2 , 4 4 0                    2,559                        Cl o s e d P a r k s #3  CR E S P I  PA R K QW 1 1              21 0 , 9 9 8                    ‐                                 18 4 , 9 1 9                    26,079                    Cl o s e d P a r k s #1 8  SC O T T  RA K O W  PA I N T                            QW 1 1              13 0 , 0 0 0                    ‐                                 11 6 , 7 7 6                    13,224                    Cl o s e d P a r k s #1 8  SC O T T  RA K O W  HV A C                              QW 1 1              15 0 , 0 0 0                    ‐                                 13 7 , 3 0 2                    12,697                    Cl o s e d P a r k s #1 3  NO R T H  SH O R E  RO O F                             QW 1 1              37 5 , 0 0 0                    ‐                                 37 4 , 7 2 2                    276                                Cl o s e d P a r k s #1 8  SC O T T  RA K O W  RO O F                              QW 1 1              1, 1 2 4 , 0 0 0              ‐                                 12 7 , 2 1 7                    99 6 , 7 8 2                Cl o s e d P a r k s #1 3  NO R T H  SH O R E  CA M E R A S                        QW 1 1              20 5 , 6 9 9                    ‐                                 60 , 8 5 8                          14 4 , 8 4 1                Cl o s e d P a r k s #1 8  SC O T T  RA K O W  CA M E R A S                       QW 1 25 0 , 0 0 0                    ‐                                 11 0 , 6 5 9                    13 9 , 3 4 0                Cl o s e d P a r k s #2 6  MI A M I  CI T Y  BA L L E T  RO O F                  QW 1 76 0 , 0 0 0                    75 8 , 8 2 4                    1,175                        Cl o s e d P a r k s #1 8  SC O T T  RA K O W  WI N D O W S                        QW 1 70 0 , 0 0 0                    19 4 , 6 0 1                    50 5 , 3 9 6                Cl o s e d P a r k s #2 6  FIL L M O R E  RO O F QW 1 1, 9 2 0 , 0 0 0              1, 8 7 4 , 1 5 4              45,844                    Cl o s e d P a r k s #4  FA I R W A Y  PA R K  PA V I L I O N                      1 50 , 0 0 0                        ‐                                 35 , 0 4 4                          14,955                    Cl o s e d P a r k s #2  CO L L I N S  PA R K QW 1 64 0 , 0 0 0                    ‐                                 55 7 , 2 8 6                    82,713                    Cl o s e d P a r k s #1 3  NO R T H  SH O R E  GE N E R A T O R                    QW 1 52 4 , 9 9 9                    ‐                                 50 3 , 8 6 1                    21,138                    Cl o s e d P a r k s #1 8  SC O T T  RA K O W  GE N E R A T O R                   QW 1 81 6 , 0 0 0                    ‐                                 72 9 , 7 1 7                    86,281                    Co m p l e t e Pa r k s #1 8  SC O T T  RA K O W  PO O L                              QW 1 97 7 , 9 9 8                    36 , 9 3 6                   92 8 , 3 7 8                    12,684                    Pa r k s  Su m 20         13 , 7 0 9 , 9 9 0        36 , 9 3 6                   11 , 5 0 8 , 7 8 6          2, 1 6 4 , 2 5 1        Cl o s e d P u b l i c  Sa f e t y # 5 3  PO R T A B L E  BO L L A R D S                            QW 1 1              60 0 , 0 0 0                    ‐                                 59 9 , 9 1 5                    84   Cl o s e d P u b l i c  Sa f e t y # 5 2  TA T U M  PA R K  LE D  LI G H T I N G               QW 1 1              15 1 , 9 9 9                    ‐                                 52 , 7 5 8                          99,240                    Cl o s e d P u b l i c  Sa f e t y # 5 2  CR E S P I  PA R K  LE D  LI G H T I N G             QW 1 1              86 , 9 9 9                        ‐                                 41 , 7 8 0                          45,218                    Cl o s e d P u b l i c  Sa f e t y # 5 2  ST I L L W A T E R  PA R K  LE D  LI G H T I N G      QW 1 1              86 , 9 9 9                        ‐                                 41 , 7 8 0                          45,218                    Cl o s e d P u b l i c  Sa f e t y # 4 7  MA C A R T H U R  CS W Y    RE A D E R S               QW 1 1              12 0 , 0 0 0                    ‐                                 64 , 9 0 4                          55,095                    Cl o s e d P u b l i c  Sa f e t y # 5 2  NO R M A N D Y  IS L E  PA R K  LE D  LI G H T I N G QW 1 1              71 5 , 0 0 0                    ‐                                 21 2 , 5 9 3                    50 2 , 4 0 5                Cl o s e d P u b l i c  Sa f e t y # 4 7    71  ST .  EN T R A N C E  RE A D E R S             QW 1 24 0 , 0 0 0                    ‐                                 31 , 5 8 2                          20 8 , 4 1 7                Cl o s e d P u b l i c  Sa f e t y # 4 7  JU L I A  TU T T L E  CS W Y  RE A D E R S QW 1 20 0 , 0 0 0                    89 , 1 8 5                          11 0 , 8 1 4                Pu b l i c  Sa f e t y  Su m 8              2, 2 0 0 , 9 9 7              ‐                                 1, 1 3 4 , 4 9 7              1, 0 6 6 , 4 9 1        To t a l  Su m 29         16 , 9 1 0 , 9 8 7        36 , 9 3 6                   13 , 6 4 3 , 2 8 3          3, 2 3 0 , 7 4 2        No t e :   Re d  fi g u r e s  ar e  pr o j e c t e d  pr o j e c t  sa v i n g s  fr o m  Co m p l e t e d  pr o j e c t s . SE C T I O N I V SECTION IV SECTION VII Mi d B e a c h S o u t h B e a c h N o r t h B e a c h W 44TH ST A L T O N R D MAC AR T H U R C S W Y W B A L T O N R D CO L L I N S A V E 79TH C S W Y 17TH ST IN D I A N C R E E K D R 23RD S T ALT O N RD N B IN D I A N C R E E K D R HA R D I N G A V E AL T O N R D 71ST ST A B B O T T A V E 1 9 5 - A L T O N R A M P O N W B W 63RD ST 5TH ST W 41ST ST PIN E T R E E D R CO L L I N S A V E DADE BL V D NORMA N D Y D R LA G O R C E D R VENETIAN CSWY MAC A R T H U R C S W Y E B ALTON R D I 195 WB I 195 EB Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user community S C A L E R E Q U E S T E D F I L E N A ME D R A W N D A T ES H E E TN O . T r a c k I t N u m b e r 1 1 S t r e e t W o r k P l a nMi a m i B e a c hMi a m i - D a d e C o u n t y, F L 12/10/2020 WORKHerSNot To ScaleRoy Coley MiamiBeachGIS 0 0 0 0 0 0 µ Mi a m i B e a c h G I S • 1 7 0 0 C o n ve n t i o n C e n t e r D r i ve • Mi a m i B e a c h , F L 3 3 1 3 9 • 3 0 5 . 6 7 3 . 7 0 0 0 • g i s@m i a m i b e a c h f l . g o v • w w w . m i a m i b e a c h f l . g o v F:\WORK\$ALL\Pavement Management\Operations 5 Year Work Plan\GOB\Maps\ArcMap\street_QW_10_511X171_20201203_a.mxd State & County Roads In Progress by C.I.P. P a r t 1 - S t r e e t s W o r k P l a n G O B S t a t u s Part 1 Scheduled Part 1 Completed Mi d B e a c h S o ut h B e a c h N o rt h B e a c h W 44TH ST A L T O N R D MAC A R T H U R C S W Y W B A L T O N R D CO L L I N S A V E 79TH C S W Y 17TH ST IN D I A N C R E E K D R 23RD S T ALT O N RD N B IN D I A N C R E E K D R HA R D I N G A V E AL T O N R D 71ST ST A B B O T T A V E 1 9 5 - A L T O N R A M P O N W B W 63RD ST 5TH ST W 41ST ST PIN E T R E E D R CO L L I N S A V E DADE B L V D NORMA N D Y D R LA G O R C E D R VENETIAN CSWY MAC AR T H U R C S W Y E B ALTON R D I 195 WB I 195 EB Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user community S C A L E R E Q U E S T E D F I L E N A ME D R A W N D A T ES H E E TN O . T r a c k I t N u m b e r 1 1 S i d e w a lk W o rk P la nMi a m i B e a c hMi a m i - D a d e C o un t y, F L 12/08/2020 WORKHerSNot To ScaleRoy Coley MiamiBeachGIS 0 0 0 0 0 0 µ Mi a m i B e a c h G I S • 1 7 0 0 C o n v e n t i o n C e n t e r D ri v e • Mi a m i B e a c h , F L 3 3 1 3 9 • 3 0 5 . 6 7 3 . 7 0 0 0 • g i s@m i a m i b e a c h f l. g o v • w w w . m i a m i b e a c h f l. g o v F:\WORK\$ALL\Pavement Management\Operations 5 Year Work Plan\GOB\Maps\ArcMap\Sidewalk_TRANCHE_v10_5_20201207.mxd State & County Roads In Progress By C.I.P P a rt 1 - S i d e w a lk W o rk P la n T ra n c h e 1G O B _ S t a t us 3 Month Work Ahead Part 1 Completed Part 1 Scheduled SECTION VIII