LTC 042-2021 Florida Department of Transportation I-395 Signature Bridge Project Update_Jan2021DocuSign Envelope ID: 53A6AB90-864B-402D-9200-FBF2DA0059D6 NO. LTC # 042-2021 Mayor Dan Gelber and Members of the City Commission Raul J. Aguila, Interim City Manager January 27, 2021 FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) I-395 SIGNATURE BRIDGE PROJECT UPDATE The purpose of this Letter to Commission is to transmit the attached presentation from the Florida Department of Transportation on the current status of the I-395 Signature Bridge project. Please feel free to contact me if you have any questions. Attachment RJA/ATH/JRG/JFD DocuSign Envelope ID: 53A6AB90-864B-402D-9200-FBF2DA0059D6 City of Miami Beach Commission Update January 27, 2021 DocuSign Envelope ID: 53A6AB90-864B-402D-9200-FBF2DA0059D6 This PowerPoint presentation was prepared by the Florida Department of Transportation (FDOT) staff and has been made available to the public as part of public records access. Any dissemination of this presentation by anyone or entity other than FDOT staff is not official. Any questions can be sent to FDOT- D6PIO@dot.state.fl.us. This presentation may not be altered. 2 DocuSign Envelope ID: 53A6AB90-864B-402D-9200-FBF2DA0059D6 ONGOING CONSTRUCTION ACTIVITIES • Ongoing nighttime closure on I-95 from NW 8 Street to NW 29 Street for concrete replacement on southbound lanes • Ongoing bridge approach slab replacement • Concrete pavement replacement is approximately 90% complete 3 DocuSign Envelope ID: 53A6AB90-864B-402D-9200-FBF2DA0059D6 ONGOING AND UPCOMING CONSTRUCTION ACTIVITIES 4 DocuSign Envelope ID: 53A6AB90-864B-402D-9200-FBF2DA0059D6 THREE MONTH LOOK AHEAD ANTICIPATED NIGHTTIME LANE CLOSURES ON THE I-95 CORRIDOR: • Nighttime lane closure along I-95 between NW 8 Street and NW 29 Street • Closure of I-95 entrance/exit ramps at NW 8 Street • I-95 ramps to I-395 and SR 836 • Lane closure hours – 9 p.m. to 5:30 a.m. weeknights, and 11 p.m. to 11 a.m. on Fridays and Saturdays • Full I-95 closures are anticipated for approach slab replacement work 5 DocuSign Envelope ID: 53A6AB90-864B-402D-9200-FBF2DA0059D6 ONGOING AND UPCOMING CONSTRUCTION ACTIVITIES • Ongoing widening of the eastbound SR 836 ramp to northbound I-95 for an additional lane • Contractor to begin installing steel bridge beams for ramp widening 1-25-2021 6 DocuSign Envelope ID: 53A6AB90-864B-402D-9200-FBF2DA0059D6 ONGOING AND UPCOMING CONSTRUCTION ACTIVITIES Ongoing widening on eastbound SR 836 from NW 10 Avenue to I-95 1-25-2021 7 DocuSign Envelope ID: 53A6AB90-864B-402D-9200-FBF2DA0059D6 ONGOING AND UPCOMING CONSTRUCTION ACTIVITIES Removal of median area on SR 836 from NW 12 Avenue to NW 17 Avenue completed 1-25-2021 8 DocuSign Envelope ID: 53A6AB90-864B-402D-9200-FBF2DA0059D6 ONGOING AND UPCOMING CONSTRUCTION ACTIVITIES AUGER CAST PILE (ACP) FOUNDATIONS • Total of 507 ACP will be used for viaduct foundations. 257 installed to date. • Ongoing footer and column construction on SR 836 median between the toll gantry and NW 17 Avenue 1-25-2021 9 DocuSign Envelope ID: 53A6AB90-864B-402D-9200-FBF2DA0059D6 ONGOING AND UPCOMING CONSTRUCTION ACTIVITIES Avenue 10 DocuSign Envelope ID: 53A6AB90-864B-402D-9200-FBF2DA0059D6 CASTING YARD FOR DOUBLE-DECKED SR 836 BRIDGE CAPS Total number of CAPs – 140 CAPs cast to date - 13 11 DocuSign Envelope ID: 53A6AB90-864B-402D-9200-FBF2DA0059D6 SR 836 BRIDGE CAP AND BEAM INSTALLATION 12 DocuSign Envelope ID: 53A6AB90-864B-402D-9200-FBF2DA0059D6 ONGOING LANE CLOSURES THREE MONTH LOOK AHEAD ANTICIPATED NIGHTTIME LANE CLOSURES ON SR 836 CORRIDOR: • Single and double lane closures along eastbound and westbound SR 836 • SR 836 ramps to northbound and southbound I-95 • Arterial roads under SR 836 • NW 17 Avenue and NW 12 Avenue ramps to SR 836 • Lane closure hours – 9 p.m. to 5:30 a.m. weeknights, and 11 p.m. to 7 a.m. on Fridays and Saturdays • Full I-395 eastbound closure on Friday, January 29 for sign structure removal 13 DocuSign Envelope ID: 53A6AB90-864B-402D-9200-FBF2DA0059D6 ONGOING AND UPCOMING CONSTRUCTION ACTIVITIES • Ongoing Auger ACP installation for signature bridge Arches # 5 foundation, Arch # 4 ACP completed. Segmental ACP – 355/857 Signature ACP – 286/520 Arches #1 and #2 Completed 1-25-2021 14 DocuSign Envelope ID: 53A6AB90-864B-402D-9200-FBF2DA0059D6 ONGOING AND UPCOMING CONSTRUCTION ACTIVITIES Segments erected to date: 260 1-25-2021 15 11-24-2020 DocuSign Envelope ID: 53A6AB90-864B-402D-9200-FBF2DA0059D6 ONGOING AND UPCOMING CONSTRUCTION ACTIVITIES 16 DocuSign Envelope ID: 53A6AB90-864B-402D-9200-FBF2DA0059D6 ONGOING AND UPCOMING CONSTRUCTION ACTIVITIES Second segmental erection crew working just west of NW 1 Place and south of I-395 1-25-2021 17 11-24-2020 DocuSign Envelope ID: 53A6AB90-864B-402D-9200-FBF2DA0059D6 ONGOING AND UPCOMING CONSTRUCTION ACTIVITIES 18 DocuSign Envelope ID: 53A6AB90-864B-402D-9200-FBF2DA0059D6 ONGOING AND UPCOMING CONSTRUCTION ACTIVITIES Integral pier for eastbound I-395 collector distributor bridge Total number of I-395 piers: 94 Total number completed to date: 30 19 DocuSign Envelope ID: 53A6AB90-864B-402D-9200-FBF2DA0059D6 ONGOING AND UPCOMING CONSTRUCTION ACTIVITIES Closure of NW Miami Court and NW 13 Street for installation of bridge segments 20 2 DocuSign Envelope ID: 53A6AB90-864B-402D-9200-FBF2DA0059D6 UPCOMING & ONGOING CONSTRUCTION ACTIVITIES 1 Traffic shift on Biscayne Boulevard from NE 13 Street to NE 11 Terrace. Shift lanes to the outside. There will be three NB Lanes (two through lanes and one left turn lane onto NE 13 Street) and three SB Lanes (two through lanes and one left turn lane onto EB MacArthur Causeway). 2 Close Bayshore loop ramp to EB MacArthur Causeway (March 2021) 21 1 DocuSign Envelope ID: 53A6AB90-864B-402D-9200-FBF2DA0059D6 SEGMENTAL CASTING YARD 22 DocuSign Envelope ID: 53A6AB90-864B-402D-9200-FBF2DA0059D6 SEGMENTAL CASTING YARD Total Segments: 1949 Total Segments Cast to Date: 562 23 DocuSign Envelope ID: 53A6AB90-864B-402D-9200-FBF2DA0059D6 ONGOING LANE CLOSURES THREE MONTH LOOK AHEAD ANTICIPATED NIGHTTIME LANE CLOSURES ON I-395 CORRIDOR: • Lane closures along eastbound and westbound I-395 • Lane closures along Biscayne Boulevard and other arterial roadways adjacent to I-395 • Permanent closure on NW Miami Court implemented between NW 13 Street and NW 12 Street • Closure hours – 10 p.m. to 5:30 a.m. on weeknights, and 1 a.m. to 7 a.m. on Saturdays and Sundays 24 DocuSign Envelope ID: 53A6AB90-864B-402D-9200-FBF2DA0059D6 COMMUNITY OUTREACH PROJECT WEBSITE • www.i-395miami.com • Sign-up for project alerts/updates Lane closure information Upcoming construction activities Presentations • Calendar of events OUTREACH OFFICE IN THE OVERTOWN COMMUNITY • 1035 NW 3 Avenue, Miami, Florida 33136 (CLOSED AT THIS TIME) STAKEHOLDER MEETINGS • Stakeholder meetings will be held virtually until further notice. Next meeting TBD. 25 DocuSign Envelope ID: 53A6AB90-864B-402D-9200-FBF2DA0059D6 THANK YOU! www.i-395miami.com Contact: Oscar Gonzalez 786-280-0983 OGonzalez@mrgmiami.com 26