Loading...
Resolution 2021-31535 RESOLUTION NO. 2021-31535 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ACCEPTING THE RECOMMENDATION OF THE CITY MANAGER, PURSUANT TO REQUEST FOR QUALIFICATIONS (RFQ) 2021-008-WG FOR CONSTRUCTABILITY, COST AND VALUE ENGINEERING REVIEW SERVICES; AUTHORIZING THE ADMINISTRATION TO ESTABLISH A POOL OF PREQUALIFIED CONSULTANTS FOR SPECIFIC TASKS RELATING TO FUTURE CONSTRUCTABILITY CONSULTING SERVICES; AUTHORIZING THE ADMINISTRATION TO ENTER INTO NEGOTIATIONS WITH PROGRAM CONTROLS INC, PMA CONSULTANTS, LLC, KCI TECHNOLOGIES, INC, AND NOVA CONSULTING, INC; AS THE TOP RANKED PROPOSERS; FURTHER, AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AGREEMENTS WITH EACH OF THE FOREGOING PROPOSERS UPON CONCLUSION OF SUCCESSFUL NEGOTIATIONS BY THE ADMINISTRATION; AND, FURTHER, AUTHORIZING THE CITY MANAGER TO EXTEND, ON A MONTH TO MONTH BASIS, THE CURRENT AGREEMENTS WITH KCI TECHNOLOGIES, INC, U.S COST, INCORPORATED D/B/A RIB U.S. COST AND ATANE ENGINEERS ARCHITECTS AND LAND SURVEYORS, DPC, F/K/A HAKS ENGINEERS, ARCHITECTS AND LAND SURVYEORS, DPC, UNTIL SUCH TIME AS NEW AGREEMENTS CAN BE EXECUTED. WHEREAS, on January 4, 2016, the City of Miami Beach entered into agreements with U.S Cost, Inc. d/b/a Rib U.S. Cost, Keith and Schnars, P.A., Atane (Haks) Engineers Architects and Land Surveyors, pursuant to RFQ 2015-160-YG for Constructability, Cost and Value Engineering Review Services; and WHEREAS, the initial term of the agreement was for a three (3) year term with two (2) additional one-year renewal options; and WHEREAS, the current agreements are scheduled to expire commencing on January 14, 2021; and WHEREAS, on August 29, 2019 the City Manager, pursuant to Resolution No 2019- 30894, approved the assignment of contract from Keith and Schnars P.A., to KCI Technologies, Inc.; and WHEREAS, the City desires to establish term contracts with a pool of qualified successful proposers, with the required expertise and personnel, in order to facilitate the assignments for the provision of Constructability, Cost, and Value Engineering Review Services; and WHEREAS, the successful proposers will be assisting the City with: constructability reviews; value engineering analysis to identify potential cost savings; technical specification reviews; identifying alternate construction means and methods; establishing accurate project scheduling; establishing quality assurance/quality control guidelines; meeting with the design team and City during the development of a project; and participating in the review of bids or proposals; and WHEREAS, these review services will be for the various current and up-coming Right of Way (ROW) neighborhood improvement projects, underground utility and facilities projects under development by the City; and WHEREAS, on October 13, 2020, the Mayor and City Commission approved to issue Request for Qualifications (RFQ) 2021-008-WG for Constructability, Cost and Value Engineering Review Services; and WHEREAS, RFQ responses were due and received on November 23, 2020; and WHEREAS, the City received proposals from the following six firms: KCI Technologies, Inc., Michael Baker International, Inc., Nova Consulting, Inc., PMA Consultants, L.L.C., Program Controls Inc, and Straight Ahead Construction, Inc.; and WHEREAS, all of the proposals submitted were found to be responsive to the requirements of the RFQ; and WHEREAS, on November 19, 2020, the City Manager appointed Evaluation Committee comprised of Lily Alvarez, Administrative Services Manager, Property Management Department, City of Miami Beach, Daniel Cevallos, Capital Projects Coordinator, Department of Capital Improvement Projects, City of Miami Beach, and Jorge Rodriguez, Capital Projects Coordinator, Department of Capital Improvement Projects, City of Miami Beach; and WHEREAS, the Committee was provided an overview of the project, information relative to the City's Cone of Silence Ordinance and the Government Sunshine Law; and WHEREAS, the Committee was also provided with general information on the scope of services, and a copy of each proposal and was further instructed to score and rank each proposal pursuant to the evaluation criteria established in the RFQ; and WHEREAS, the evaluation process resulted in the proposers being ranked by the Evaluation Committee in the following order: 1st- Program Controls, Inc.; 2nd - PMA Consultants, L.L.C.; 2nd - KCI Technologies, Inc.; 4th - Nova Consulting, Inc.; 5th - Michael Baker International, Inc.; and 6th - Straight Ahead Construction, Inc.; and WHEREAS, after reviewing all of the submissions and the Evaluation Committee process, the City Manager agreed with the Evaluation Committee and found that the top four ranked proposers had vast experience in providing constructability, cost and value engineering review services and would be the best qualified firms to be included in the prequalified pool of consultants for future engagements relating to these services. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby accept the recommendation of the City Manager, pursuant to Request for Qualifications (RFQ) 2021-008-WG for constructability, cost and value engineering review services; authorize the Administration to establish a pool of prequalified consultants for specific tasks relating to future constructability consulting services; authorize the Administration to enter into negotiations with Program Controls Inc, PMA Consultants, L.L.C., KCI Technologies, Inc., and Nova Consulting, Inc., as the top ranked proposers; and authorize the Mayor and City Clerk to execute agreements with each of the foregoing proposers upon conclusion of successful negotiations by the Administration; and, further, authorize the City Manager to extend, on a month to month basis, the current agreements with KCI Technologies, Inc., U.S Cost, Incorporated d/b/a Rib U.S. Cost, and Atane Engineers Architects and Land Surveyors, D.P.C., f/k/a Haks Engineers, Architects and Land Surveyors, D.P.C., until such time as new agreements can be executed. Jy�ua2y PASSED and ADOPTED this /9 day of / 2021. ATTEST: 12-41------ Dan Gelber, Mayor Rafae E. Granado, CiCie k 5. I o CoNREDs ‘ q_ I;-,,,,,,2 *----- APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION �• j, Fop-(_ i 202,( City Attorney Dote Resolutions -C7 C MIAMI BEACH COMMISSION MEMORANDUM TO: Honorable Mayor and Members of the City Commission FROM: Raul J.Aguila, Interim City Manager DATE: January 13, 2021 SUBJECT:A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ACCEPTING THE RECOMMENDATION OF THE CITY MANAGER, PURSUANT TO REQUEST FOR QUALIFICATIONS (RFQ) 2021-008-WG FOR CONSTRUCTABILITY, COST AND VALUE ENGINEERING REVIEW SERVICES;AND FURTHER,AUTHORIZING THE MONTH-TO-MONTH EXTENSION OF THE CURRENT AGREEMENTS WITH KCI TECHNOLOGIES, INC., U.S. COST, INC. D/B/A RIB U.S. COST AND ATANE (HAKS) ENGINEERS ARCHITECTS AND LAND SURVEYORS, UNTIL SUCH TIME AS NEW AGREEMENTS CAN BE EXECUTED. RECOMMENDATION The Administration recommends that the Mayor and City Commission of the City of Miami Beach, Florida approve the resolution accepting the City Manager's recommendation pertaining to bids received, pursuant to RFQ 2021-008-WG, for Constructability, Cost and Value Engineering Review Services BACKGROUND/HISTORY On January 4, 2016, the City of Miami Beach entered into agreements with U.S Cost, Inc. D/B/A Rib U.S. Cost, Keith and Schnars, P.A., Atane (Haks) Engineers Architects and Land Surveyors, pursuant to RFQ 2015-160-YG for Constructability, Cost and Value Engineering Review Services. The initial term of the agreement was for a three (3) year term with two (2) additional one-year renewal options. The present agreements are scheduled to expire beginning January 14, 2021. On August 29, 2019 the City Manager, pursuant to Resolution No 2019-30894, approved the assignment of contract from Keith and Schnars P.A.,to KCI Technologies. In light of the expiring contracts, the City desires to establish replacement contracts with a pool of qualified successful proposers, with the required expertise and personnel, in order to facilitate the assignments for the provision of constructability, cost, and value engineering review services as required by City departments managing construction projects. After City Commission award approval, the City will negotiate and establish contracts with the successful proposers for a term of three (3)years, with options to renew for two (2)additional one (1)year periods. Page 147 of 1954 The consultants will be assisting the City with: constructability reviews, value engineering analysis to identify potential cost savings, technical specification reviews, identifying alternate construction means and methods, establishing accurate project scheduling, establishing quality assurance/quality control guidelines, meeting with the design team and City during the development of a project, and participating in the review of bids or proposals. These review services will be for the various current and up-coming, right of way (ROW) neighborhood improvement projects, underground utility and facilities projects under development by the City. When professional services are required, a proposed project will be analyzed in terms of the predominant professional specialty required, and a firm will be selected from the appropriate specialization list. Consultants selected to provide constructability, cost, and value engineering services for a particular project are precluded from bidding/responding to the competitive solicitation for the design and/or construction of the project. ANALYSIS On October 13, 2020, the Mayor and City Commission approved to issue Request for Qualifications (RFQ) 2021-008-WG for constructability, cost and value engineering review services. RFQ responses were due and received on November 23, 2020. The City received proposals from the following six firms: KCI Technologies, Inc., Michael Baker International, Inc., Nova Consulting, Inc., PMA Consultants LLC, Program Controls Inc, and Straight Ahead Construction, Inc. All of the proposals submitted were found to be responsive to the requirements of the RFQ. On November 19, 2020, the City Manager appointed Evaluation Committee convened to consider proposals received. The Committee was comprised of Lily Alvarez, Administrative Services Manager, Property Management Department, City of Miami Beach, Daniel Cevallos, Capital Projects Coordinator, Department of Capital Improvement Projects, City of Miami Beach, and Jorge Rodriguez, Capital Projects Coordinator, Department of Capital Improvement Projects, City of Miami Beach. The Committee was provided an overview of the project, information relative to the City's Cone of Silence Ordinance and the Government Sunshine Law. The Committee was also provided with general information on the scope of services and a copy of each proposal. The Committee was instructed to score and rank each proposal pursuant to the evaluation criteria established in the RFQ. The evaluation process resulted in the proposers being ranked by the Evaluation Committee in the following order(See Attachment A): 1St-Program Controls, Inc. 2"d- PMA Consultants LLC 2nd - KCI Technologies, Inc 4th- Nova Consulting, Inc. 5th- Michael Baker International, Inc. 6th-Straight Ahead Construction, Inc. Page 148 of 1954 A summary of the four top-ranked firms follows: Program Controls. Inc. As a Miami-based engineering firm, PCI is one of the very few firms in South Florida with a specialization and complete focus on all controls aspects of large projects and programs/projects including estimating, VE, scheduling, cost controls, construction constructability and management. PCI has been the controls backbone of several large Miami- Dade programs at Miami-Dade Water& Sewer Department, Miami International Airport, Port of Miami, Miami Dade College, and Miami Dade Public Schools for the last couple of decades. With its expertise and superior service, PCI is widely recognized for its "best-of-class" controls and construction management practices and has been credited towards the successes of such complex programs. Partnering with PCI, is 300 Engineering Group, PA, A local powerhouse of multidiscipline professionals with over 35 years of progressive experience in delivering infrastructure project for Miami-Dade municipalities. 300 Engineering specializes in the full range of services in civiI, transportation, environmental, mechanical, instrumentation&controls, and electrical engineering. In the last six (6)years alone, 300 Engineering partnered with Miami-Dade County in two (2) of its largest infrastructure programs and provided constructability reviews and VE for over 250 projects. 300 Engineering has the reliable depth of local resources and technical expertise to support&partner with PCI Team in protecting the City's investments in infrastructure. PMA Consultants LLC The PMA team is comprised of experts with decades of combined experience in performing constructability reviews as well as value engineering (VE).As a full-service program and project management services firm, PMA possesses several distinguishing offerings from collaborative project planning, to project risk analysis, claims avoidance, and Value Engineering, among others.As a premier construction management services provider PMA has been instrumental in leading numerous private and public project cost control programs that create and implement innovative solutions to provide added value improvements at the least cost and greatest value. In addition to PMA's wide-ranging experience, they have partnered with 305 Consulting Engineers, LLC a Miami based engineering firm with more than 27 years' experience including highway/bridge design and inspections, construction and contract administration, repair of construction failures, and other general civil engineering service in various fields such as environmental, governmental, maritime, educational, aviation, and housing. In addition, 305 fully staffs and supplements infrastructure project management and construction engineering inspection (CEI)teams with highly qualified and motivated personnel. Another part of the PMA team is CPM North America (CPM), an engineering and technical infrastructure advisory firm with an active consulting practice in public-private partnerships ("P3s" or "PPPs"). With more than 25 years of experience in infrastructure and procurement consulting, program management, project controls, and construction management, CPM actively advises and assists public and private clients in formulating, procuring and successfully completing complex infrastructure projects. KCI Technologies. Inc KCI is a 100-percent employee-owned engineering, consulting and construction firm with 47 offices throughout the United States. In 2020, their firm moved up 11 spots in the Engineering Page 149 of 1954 News Record (ENR) top 500 firms to #54, a testament of their commitment to their client's success. their consultant partner Alpha Corporation, is ranked in the top 100 CM and in the top 50 PM firms with ENR. Combined, their firms bring over 100 years of construction management, value engineering, and constructability review experience that will be available to the City's various departments at a moment's notice. KCI has maintained a long history of working with public entities, bringing beneficial projects to completion for their clients. Many of their client relationships extend over 30 years, illustrating their commitment to providing top quality services in the community. Nova Consulting. Inc. Nova brings decades of experience providing professional services to state, county and municipal agencies in Miami- Dade County. Nova's proposed staff for this contract have worked locally for most of their careers in the successful execution of numerous projects. Nova's significant local civil engineering work and experience with Miami Dade County agencies such as MDAD, DTPW, RER, MDWASD, and regional South Florida agencies such as SFWMD has allowed them to establish local professional relationships with specialty providers that may be required during the course of this contract including land surveying and geotechnical services. Their local experience brings first-hand knowledge of local conditions; local regulations, standards, processes and procedures; local permitting requirements; stakeholder and public outreach concerns; multi-agency coordination needs; general contracting practices; and construction methodologies specific to South Florida. Their local experience addressing water resources engineering issues has included all types of infrastructure projects in the areas of water,wastewater, and stormwater. SUPPORTING SURVEY DATA Based on the 2019 Community Satisfaction Survey,the overall quality of services provided by the City is 68.6%. In order to continue maintaining excellent standards in this area, the City intends to partner with qualified firms for the purpose of providing constructability, cost and value engineering review services,which would assist in maximizing the completion of construction projects on time and on budget. FINANCIAL INFORMATION The cost of the services is included in overall project budgets. CONCLUSION After reviewing all of the submissions and the Evaluation Committee process, I concur with the Evaluation Committee and find Program Controls Inc., PMA Consultants LLC, KCI Technologies, Inc., and Nova Consulting Inc., to be the best qualified firms to be included in the prequalified pool of consultants for future engagements relating to constructability, cost and value engineering review services. The four (4) firms have vast experience in providing constructability, cost and value engineering review services. It is important to note that the RFQ was not issued with any particular project in mind; rather, the purpose of the RFQ is to proactively prequalify firms now so that proposals can be expedited when the need for constructability, cost and value engineering review services are identified. Four firms is sufficient to handle the City's anticipated project volume. For the reasons stated herein, I recommend that the Mayor and City Commission approve the Page 150 of 1954 Resolution authorizing the Administration to establish a pool of pre-qualified consultants for specific tasks relating to constructability, cost and value engineering review services; authorizing the Administration to enter into negotiations with Program Controls Inc., PMA Consultants LLC, KCI Technologies, Inc., and Nova Consulting, Inc., as the top ranked proposers; further authorizing the Mayor and City Clerk to execute agreements with each of the foregoing proposers upon conclusion of successful negotiations by the Administration; and further, authorizing the month-to-month extension of the current agreements with KCI Technologies, Inc., U.S Cost, Inc. D/B/A Rib U.S. Cost and Atane (Haks) Engineers Architects And Land Surveyors, until such time as new agreements can be executed. Is this a"Residents Right Does this item utilize G.O. to Know" item. pursuant to Bond Funds? City Code Section 2-14? No No Legislative Tracking Capital improvement Projects/Procurement ATTACHMENTS: Description D Attachment A Page 151 of 1954 RFQ 2021.008•WG co '' co Constructability,Cost,and Value Lily Alvarez Y Daniel Cevalloe Y Jorge Rodriguez c 7g Low e c c e Aggregate c Engineering Review Servicesre Totals44 IZ Qualitative Quantitative Subtotal Qualitative Quantitative Subtotal Qualitative Quantitative Subtotal KCI Technologies,Inc. 95 0 95 1 95 0 95 2 80 0 80 5 . 8 2 Michael Baker International 82 0 82 4 89 0 89 5 81 0 81 4 '?? 13 5 Nova Consulting 81 0 81 5 93 0 93 4 91 0 91 1 T 10 4 PMA Consultants LLC 91 0 91 3 94 0 94 3 87 0 87 2 '. 8 2 Program Controls,Inc 93 0 93 2 96 _ 0 96 1 86 0 86 3 6 1 Straight Ahead Construction,Inc. 76 0 76 6 82 0 82 6 _ 68 0 68 6 7c' 18 6 5 F?J i 5a.n d,�,��nnLLyy�y��S ]] a s I�]'x x �1y�,,W r..: �"`)':1`y*'0 Y.s .�nt f r it a f 4i y�,v i �{A�. r CyM F r i Ff.e V��r�'-� �,.VI ��':e2'3°J�.,,�;�f�M 'IS'X4ni.�i,7 ��V.I�.Phh'L��yl�.�!Rh..d t!. :�r h�Y1.�kv.�L5,�Y6f{� ?C 6Ii'141d IIA 4'�.n14�t^B.E f;Y T.:;n�9J....:.111. Total Quantitative Proposer Veteran's Points (Veteran's) KCI Technologies,Inc. 5 0 Michael Baker International 5 0 Nova Consulting 5 0 PMA Consultants LLC 5 0 Program Controls,Inc 5 0 Straight Ahead Construction,Inc. _ 5 0 Page 152 of 1954