No preview available
 /
     
Ordinance 2020-4384 ORDINANCE NO. 2020-4384 AN ORDINANCE OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, AMENDING CHAPTER 110 OF THE CODE OF THE CITY OF MIAMI BEACH ENTITLED "UTILITIES," ARTICLE IV, ENTITLED "FEES, CHARGES, RATES AND BILLING PROCEDURE," BY AMENDING SECTION 110-166 THEREOF, ENTITLED "SCHEDULE OF MONTHLY WATER USER RATES AND TAPPING CHARGES;" BY AMENDING SECTION 110-168 THEREOF, ENTITLED "SCHEDULE OF MONTHLY SANITARY SEWER USER RATES" ARE TO BE AMENDED; AND BY AMENDING SECTION 110- 171 THEREOF, ENTITLED "RATE INDEXING," IN ORDER TO ADJUST AND MODIFY HOW WATER AND SANITARY SEWER RATES ARE CALCULATED AND APPLIED; AND FURTHER,AMENDING APPENDIX A OF THE CITY CODE, ENTITLED "FEE SCHEDULE," TO INCREASE THE WATER RATES AND SANITARY SEWER SERVICE CHARGES IMPOSED BY THE CITY PURSUANT TO SECTIONS 110-166, 110-168, 110-171, AND APPENDIX A; PROVIDING FOR CODIFICATION; REPEALER; SEVERABILITY; AND AN EFFECTIVE DATE. WHEREAS, Chapter 110, of the Code of the City of Miami Beach, entitled "Utilities" and Appendix A to Chapter 110 establish the City's potable water rates for all water users and the sanitary sewer rates for all sanitary sewer users except sewer rates for wholesale customers established through contract; and WHEREAS, the City's utility rates for water and sanitary sewer services are structured to collect the necessary revenues to meet annual operating and maintenance costs of the water and sanitary sewer infrastructure, to cover debt service for water and sewer bonds, to fund capital improvements to the City's utility system infrastructure, maintain adequate operating fund and capital reserves, and to pay Miami-Dade County Water and Sewer Department (WASD) for wholesale water purchased and for the treatment of the collected City sewage; and WHEREAS, the City and its consulting engineers recently completed master plans for the water and sewer systems that identified critical capital projects to be completed over the next several years; and WHEREAS, WASD has historically raised the rates for wholesale water and sanitary sewer to recover its cost of providing service and it is anticipated by WASD that it will continue to raise the rates for service due operating expenditures and debt service increases and the need to fund future capital improvements; and WHEREAS, through a formal procurement process, the City retained the firm of GovRates, Inc. (GovRates) to assist in the determination of revised water and sanitary sewer rates in order to meet the projected expenditure and funding needs of the City's utility system over the next ten years; and WHEREAS, GovRates has recommended revised rates to recover the cost of service and promote the overall sustainability of the utility system; provide the ability to adjust rates due to changes in the cost of wholesale water and wastewater service as provided by WASD; and provide the ability to index the rates for inflation and other expenses to provide utility operating margins to fund capital improvements and the repayment of debt issued by the City in support of the funding of capital improvements; and WHEREAS, the financial and rate plan proposed by GovRates recognizes the refunding the City's outstanding Series 2010 Bonds and the issuance of additional bonds in a few years; and WHEREAS, the City adopted Resolution No. 95-21585, as amended and supplemented from time to time, which authorized the issuance of utility revenue bonds to finance capital improvements to the utility system (hereinafter the "System") which included a requirement that the revenues of the System shall at all times meet the rate covenant requirements as delineated in such resolution for the protection of the bondholders; and WHEREAS, when the City issues new debt to finance critical capital needs, bond rating agencies expect that all rates needed to pay the debt have already been adopted; and WHEREAS, in order to properly fund the City's water and sewer program,the City seeks to amend Chapter 110 and Appendix A to codify the GovRates recommendations; and WHEREAS, the GovRates recommendations recognize the need to increase combined water and sewer user rate revenues by 2.4%, 2.3%, 2.3%, 2.3%, and 2.3% for the fiscal years 2021, 2022, 2023, 2024, and 2025 respectively, as well as to pass- through future WASD wholesale water and sewer rate increases beyond Fiscal Year 2021; and WHEREAS, as part of the rate design to recover the necessary revenue for each fiscal year, GovRates recommends improving the utility's revenue stability by gradually increasing the monthly water and sewer base charges over time to bring them in line with industry standards; and 2 WHEREAS, at the October 23, 2020 meeting, the Finance and Economic Resiliency Committee recommended approval of the GovRates recommendations; and WHEREAS, at the November 18, 2020 meeting, the City Commission members had the title of the Ordinance read for the record, and adopted the Ordinance on First Reading with the following direction: • Administration to come back with actual dollars • Ensure they use all available funds deemed appropriate and determine the proper rate increase • John Woodruff to prepare a chart on stormwater by Second Reading. • Commissioner Richardson to work with Administration WHEREAS, at the December 9, 2020 meeting, Public Works presented three options for the City Commission's consideration (including detailed charts and tables), each of which is more fully set forth in the Commission Memorandum accompanying this Ordinance. Specifically, Option 1 eliminated any increase for 2021; Option 2 eliminated any increase for 2021 and limits the increase for 2022 to 1%; and Option 3 eliminated any increase for years 2021 & 2022. Each option provided the total revenue increase needed over the remaining 5-year term of the plan; and WHEREAS, the City Commission determined it would be in the best interests of the City to phase in the required rate increase over time, and in a manner that would avoid economic impacts to rate payers in 2021, in view of the significant financial hardship associated with the COVID-19 pandemic; and WHEREAS, the City Commission, following substantial discussion, approved the one-time increase of water and sewer user rate revenues, set forth as Option 2 in the Commission Memorandum accompanying this Ordinance, with the total increase (inclusive of CPI increases otherwise permitted under the existing ordinance), to be phased in from 2021 through 2025, as follows: 0% in 2021; 1% in 2022; 3.6% in 2023; 3.6% in 2024; and 3.7% in 2025; and WHEREAS, the amendments set forth below are necessary to accomplish the above objectives. NOW THEREFORE, BE IT ORDAINED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH,FLORIDA: SECTION 1. That Chapter 110 of the Miami Beach City Code entitled "Utilities," Article IV, entitled "Fees, Charges, Rates and Billing procedure," at Section 110-166, entitled "Schedule of monthly water user rates and tapping charges;" Section 110-168, entitled 3 "Schedule of monthly sanitary sewer user rates," and Section 110-171, entitled "Rate indexing" are hereby amended as follows: CHAPTER 110 UTILITIES ARTICLE IV. Fees, Charges, Rates and Billing Procedure. Sec. 110-166. - Schedule of monthly water user rates and tapping charges. (a) There is hereby imposed, upon all premises within the city connected to or using the facilities of the city's potable water system, a monthly water user rate. Every premises connected to or using the facilities of the city's potable water system shall be billed monthly user rates consisting of: i) a base facility charge which serves as the monthly minimum service charge on each service installed, varying with and based upon the size of the meter installed in accordance with the rules of the public works department; ii) a water consumption charge; and iii) a purchased water pass-through adjustment rate to recover the cost of purchased wholesale water as billed by the Miami-Dade Water and Sewer Department (WASD). The monthly water user rates charged for service shall be in accordance with the consumer applicability provisions and the corresponding schedule set forth in Appendix A, as may be adjusted from time to time based on the provisions of the section. There shall not be a rental charge on meters. The monthly water user rates shall be charged to each individually metered water consumer each month in accordance with the following applicability provisions: (1) Individual Metered Residential Service - Applicable to all consumers that represent service to a residential dwelling unit that is individually metered for potable water service that is not classified as irrigation service. (2) Master Metered Multifamily Residential Service-Applicable to all consumers that represent service to a residential dwelling units that is master-metered (more than one residential dwelling unit being served by the water meter measuring service to the premise) which would include, but not be limited to, condominiums, apartments, and duplexes, that are not classified as irrigation service. (3) Nonresidential Service - Applicable to all water customers that are not classified as individually metered residential service, master-metered residential service, or irrigation service which primarily represents service to commercial customers public authorities, and institutional customers. (4) Residential Irrigation Service -Applicable to all residential dwelling units that are individually metered for domestic water use (reference subsection 110-166 (a)(i)) and which have a separate meter for irrigation service or other similar water use. 4 (5) Master Metered Multifamily Residential Irrigation Service - Applicable to all master metered residential customers that are individually metered for domestic use (reference subsection 110-166 (a)(ii)) and which have a separate meter for irrigation service or other similar water use. (6) Nonresidential Irrigation Service - Applicable to all customers classified as nonresidential that are individually metered for domestic use (reference subsection 110-166 (a)(ii)) and which have a separate meter for irrigation service or other similar water use. (b) To the extent practical, all water delivered to a consumer shall be metered and shall be billed the water consumption charge and the purchased water pass-through charge, which rate shall be prorated for each 100 gallons in the event of increments of less than 1,000 gallons for all consumers of water. With respect to the billing for water use, the water consumption rates and the purchased water pass-through rate as defined in this section may be added together for rate application or billing purposes on a consumer's bill. (c) Pass-Through of Purchased Wholesale Water Charges. The Purchased Water Pass- through Rate, which is applied to all water consumers being billed for potable water service, shall be increased or decreased by the city by applying a pass-through adjustment factor for any change in the average annual rates charged to the city for wholesale potable water purchased from WASD (the "Water Pass-Through Adjustment") to the Purchased Water Pass-through Rate charged by the city. (1) Adjustment schedule. The implementation of the adjustment to the Purchased Water Pass-Through Rate for any month that a change in wholesale potable water rates by WASD is effectuated ("Water Cost Recovery") shall occur without a public hearing. Water Cost Recovery shall be employed each time that WASD adjusts the average annual wholesale potable water rates that are billed to the city. Any adjustment to the Purchased Water Pass-Through Rate based on the determination of the change in wholesale rates shall be implemented in the month immediately following the determination of the Purchased Water Pass-Through Adjustment. The Purchased Water Pass-Through Rate as shown on Appendix A and as may be further adjusted automatically in the future by the implementation of the provisions of this section and in Appendix A and which are then in effect shall be increased or decreased by the city by applying a Purchased Water Pass- through Adjustment established in accordance with this subsection and in Appendix A to the then effective Purchased Water Pass-Through Rate prior to such application. Nothing herein shall preclude the city from making additional changes to the monthly water user rates for service. (2) Applicability of Purchased Water Rates. The Purchased Water Pass-Through Rate shall be in addition to any water consumption rates for all retail and wholesale customers that are billed for potable water service by the city. The 5 following are the customers that shall be subject to the application of the Purchased Water Pass-through Rate and shall be subject to the pass-through for changes in the cost of purchased water from WASD (the "Applicable Customers"): (i) The retail water customer classes that are billed the water consumption charge referenced in this section. (ii) All separate utilities or local governments that may receive wholesale potable water service provided by the city currently or in the future which is not considered as retail customers. (3) Calculation of Purchased Water Pass-Through Adjustment. The Purchased Water Pass-Through Adjustment shall be calculated using the formulas and methodology specified in Appendix PWPTA - ((IWWC PWWC) * (1/(1 (DF + T + 0))) Where: - , - . _ . - , _ • - , . •• - • Water Cost Recovery to determine the monetary adjustment—in—the - - - - - - - - A - - Customers. The PWPTA represents the respective dollar increase or - - - aeA - - - charged by WASD expressed on a dollar per 1,000 gallons basis that - ,A, - . - - - - - charged by WASD expressed on a dollar per 1,000 gallons basis rate defned- -the I1rrc-r WC. DF - The fee paid to the Department of Environmental-Resources by the city. revenues billed 6 L Itt±tdrdV106+8-6I. .. -: :::' - - •= - . - - r •- , ZerOS dt £6.6$ 211dMd 8 .- - : •. - • %0Z'Z {LsL)-8 ._.. •- -. - - r - I t 26.0/6- 0+1+a) 6)/6 -iope.ivawisnfpv %Dere 0 %00-6 t %6613sitiewts-REPV ToZUZ -6=e OOttt3 9M it Z •- - ' - : - -- • - - .• I OScL 1•S d t -- - :::' - : - - , •_ -. - - - -• r . . Ott ON aU11 - - - - - - -- - - - - • . - r' -- - " . - - - . r . _ . . . . . . . . . - - r -- . . . . . . . . - . - . _ . _ •_ - . . _ - - VidMd + 2:11dMd - 2:I1MdV tnuJej-raupvtette# - - -- - - - -- - - - - - - - - - - - - - oyl woo Isamu 044 04 papunoa aq !legs pue tuawisnfpe guns Bu!paoaid - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ' - - • , _ A , - system. •• - - - - . , - . _ rates for service. - - - - - - •- - be subject to Cost Recovery. , - . . . - _ _ for Cost Recovery• (i) All increases or decreases in the percentage charge of the Department of . • _ - •- . - PTF - ARR/ER Where: • - . _ • - _ - ••••• - estimated annual increase in the Applicable Costs, expressed as a percentage of the most recent historical revenues derived from the - A ._ _ system services as determined by the city. a_ _ .• - e - e - - - - - - - RTR - (AR)(1 + PTF) Where: 8 • — , A - T . - . _ . .. .. _ e e . _ the Dass-Through Cantor (e) On all water supply service, each month shall be a complete period in itself, and no excess consumption of water during one month shall be charged or be added to the consumption of any other month. (1) Exception. The provisions contained in this subsection (e) shall not apply to an owner or consumer of a single-family home that participates in the"budget billing" process of the utility billing system. The "budget billing" process allows owners or consumers to pay the same monthly amount for water and sewer consumption based on the average of the previous annual consumption history. If the variance in actual consumption becomes more than 50 percent of the annual consumption average, the budgeted amount would be recalculated or the budget billing would cease and regular billing would commence. To be eligible to use this "budget billing" feature, the owner and/or consumer would have to submit an application to the finance department for budget billing. After the approval of the finance department, the budget billing would commence and would only cease upon written request by the owner or consumer or the failure to pay the budget amount when the payment is due. (f) A monthly base facility charge as shown on Appendix A shall be billed to all privately owned fire-protection systems and equipment connected to the city water system in accordance with the size of the service line connecting the private system to the city's system. All costs of providing fire sprinkler service, including the service lateral, meter vault and detector check meter shall be the applicant's responsibility. If any consumer shall connect any appurtenance other than sprinkler heads to a fire service line, that consumer shall pay all connection-related charges set out in this section and the monthly water service charges identified in this section regarding service to customers delineated under the general service designation. (g) Upon the application of the owner or consumer for water service on the premises to which there has not been made any previous service for water, the tapping charges as specified in appendix A shall be made to cover the cost of the tap and the installation of the service to the property line of the lot to be supplied with water service. (h) Every owner or consumer making an application for water service shall be required to make a deposit with the public works department called a guarantee of payment deposit. The amount of such deposit shall be according to the size of the service, as specified in appendix A. If the owner or consumer making such deposit wishes the service to be discontinued, the guarantee of payment deposit shall be refunded less outstanding charges for water, sewer, stormwater or garbage and waste. If at any time the total service charges for a given account exceed the amount of the deposit, 9 the city reserves the right to demand an additional deposit up to four times the amount of any previous monthly bill on that service. (i) A request by the owner or consumer to have the water meter re-read for validation of the correctness of a meter reading will result in a fee in accordance with the schedule set forth in appendix A. This fee will be charged only if the re-read validates the accuracy of the reading in question. (j) A request by the owner or consumer to have a special water meter read at a time other than a normally scheduled read date as set by the utility will result in a fee in accordance with the schedule set forth in appendix A. (k) Meter/meter equipment and City of Miami Beach utility property servicing a premises found damaged, destroyed or missing will be charged to the owner or consumer in accordance with the schedule set forth in appendix A. (I) A request by the owner or consumer to have a field visit by a technician. This fee will be charged only if the technician finds that the problem/issue is not that of the utility. Sec. 110-168. - Schedule of monthly sanitary sewer user rates. (a) There is hereby imposed, upon all premises within the city connected to or using the facilities of the city's sanitary sewer system, a monthly sanitary sewer user rate. Every premises connected to or using the facilities of the city's sanitary sewer system shall be billed monthly user rates consisting of: (1) A base facility charge which serves as the monthly minimum service charge on each service installed, varying with and based upon the size of the meter installed in accordance with the rules of the public works department; (2) A sanitary sewer consumption charge; and (3) Purchased sanitary sewer pass-through adjustment rate to recover the cost of purchased wastewater treatment and disposal services as billed by WASD. The monthly sewer user rates charged for service shall be in accordance with the consumer applicability provisions and the corresponding schedule set in Appendix A as may be adjusted from time to time based on the provisions of the section and in Appendix A. The billed sewer consumption shall be based on the metered water delivered to the consumer for which the monthly water user rates apply. The provisions of this section shall not be applicable to any water sold and delivered through separate meters measuring water delivered and consumed solely for swimming pools, lawn sprinkler systems, cooling towers or other purposes not requiring the use of sanitary sewer system facilities of the city. The monthly sanitary sewer user rates shall be charged to each consumer each month in accordance with the following applicability provisions; 10 (1) Individual Metered Residential Service - Applicable to all consumers that represent service to a residential dwelling unit that is individually metered for water service. (2) Master-metered Multifamily Residential Service - Applicable to all sewer consumers that represent service to a residential dwelling units that is master- metered (more than one residential dwelling unit being served by the water meter measuring service to the premises) which would include, but not be limited to, condominiums, apartments, and duplexes. (3) Nonresidential Service -Applicable to all sewer customers that are not classified as individually metered residential service or master-metered residential service which primarily represents service to commercial, public authorities. and institutional customers. (b) To the extent practical, all sanitary sewer service provided to a consumer shall be based on the metered water delivered to the premises, exclusive of water-only service which is separately metered by the city, and shall be billed the sewer consumption charge and the purchased sanitary sewer pass-through charge, which rate shall be prorated for each 100 gallons in the event of increments of less than 1,000 gallons for all consumers being billed for sanitary sewer service. With respect to the billing for sanitary sewer use, the sewer consumption rates and the purchased sanitary sewer pass-through rate as defined in this section may be added together for rate application or billing purposes on a consumer's bill. (c) Pass-Through of Purchased Wholesale Sanitary Sewer Charges. The Purchased Sanitary Sewer Pass-through Rate, which is applied to all sanitary sewer consumers being billed for sewer service, shall be increased or decreased by the city by applying a pass-through adjustment factor for any change in the rates charged to the city for wholesale wastewater treatment and disposal services purchased from WASD (the "Sanitary Sewer Pass-Through Adjustment") to the Purchased Sewer Pass-through Rate charged by the city. (1) Adjustment Schedule. The implementation of the adjustment to the Purchased Sanitary Sewer Pass-Through Rate for any month that a change in wholesale sanitary sewer rates by WASD is effectuated ("Sewer Cost Recovery") shall occur without a public hearing. Sewer Cost Recovery shall be employed each time that WASD adjusts the average annual wholesale sanitary sewer rates that are billed to the city. Any adjustment to the Purchased Sanitary Sewer Pass- Through Rate based on the determination of the change in wholesale rates shall be implemented in the month immediately following the determination of the Purchased Sanitary Sewer Pass-Through Adjustment. The Purchased Sanitary Sewer Pass-Through Rate as shown Gin Appendix A and as may be further adjusted automatically in the future by the implementation of the provisions of this section and in Appendix A and which are then in effect shall be increased or decreased by the city by applying a Purchased Sanitary Sewer Pass-through Adjustment established in accordance with this subsection and in Appendix A to the then effective Purchased Sanitary Sewer Pass-Through Rate prior to such 11 application. Nothing herein shall preclude the city from making additional changes to the monthly sanitary sewer user rates for service. (2) Applicability of Purchased Sanitary Sewer Rates. The Purchased Sanitary Sewer Pass-Through Rate shall be in addition to any sewer consumption rates for all retail and wholesale customers that are billed for wastewater treatment and disposal services by the city. The following are the customers that shall be subject to the application of the Purchased Sanitary Sewer Pass-through Rate and shall be subject to the pass-through for changes in the cost of purchased wastewater treatment and disposal services from WASD (the "Applicable Customers"): (i) The retail water customer classes that are billed the sewer consumption charge referenced in this section. (ii) All separate utilities or local governments that may receive wholesale sewer service provided by the city currently or in the future which is not considered as retail customers. (3) Calculation of Purchased Sanitary Sewer Pass-Through Adjustment. The Purchased Sanitary Sewer Pass-Through Adjustment shall be calculated using the following formula: PSPTA - ((IWWC PWWC) * (1/(1 (DF + T + 0))) Where: • • - - - - L - Customers. The PSPTA represents the respective dollar increase or ■ - . _ . . . - - A . ■ . _ III • . ■ _ e _ III • rate by WASD. • - - -- - - 0- e- • •• - • •- - - the-city, - .. . 12 C6 enn did9 6—O-t 6s€$ 2i1Sd 8 (suope6 % 9 I (Lc)-9I --•• -= - -- -- - 98980-tI I tI Z6.011. -((o+l+a) 6)16 -Joped womsnfPV %OY0 0 9 sluebuteR0- %00 0 t 9 %00-8 do t •-••-- - - ._.... - SteetlitSFFIPV 9 W(6 feuette LL I'B'Z$ OS/dtt JJ l Z - - -- - z- - ' - -- - 8 0L8L'Z$ iii9SMd t _ - tett -0u id !9 - a61nelfe# '83!MGGS M VldSd + 2I1Sd - i I1SdV juowAsnfpy 46noayl ssed James tieTiues paseyaJnd ay1 'woo 1SOJeou 041 - - - -- -• - - - - ... 11-9+1 - APSTR $3,72 gallons) 8 • - ` e•_ .. _ . . . . _ - - - . 1 • 1 - •. - - A - • • - ' - - . • - _ . . . - O . _ O sewer user rates for service. _ . e.. _ - - - be subject to Cost Recovery. ' - - - - - 6very: system. • PTF - ARR/ER Where: monetary adjustment in the Applicable Rates. The PTF represents the estimated annual increse in the Applicable Costs, expressed as a percentage of the most recent historical revenues derivede - . _ 14 determined based on the Pass Through Factor applied uniformly to the - _ - . _ . _ . PTR - (AR)(1 + PTF) Where: . - - ee e - - . - . .. .. - the-Pass-Through-Faster, change in Applicable Costs. Sec. 110-171. - Rate indexing. (a) Water and sewer rates. Except as otherwise provided in this subsection, the monthly user rates established in subsections 110-167(a) for the water system and 110- 168(a) for the sanitary sewer system (collectively, the "applicable rates") as shown on schedule Appendix A and as may be further adjusted automatically in the future by implementation of the automatic rate indexing provisions as specified in Appendix A. the provisions :f-this section and which are then in effect shall be increased by The Rate Index shall never be less than 0.0%. All applicable rates so ad4u.,ted (the "indexed rates") shall be implemented by the city. • - - -• - e -- subsection 110 168(a) for the sanitary sewer system shall be subject to rate be c ubjeet to rate indexinn 15 -- - ••••• - •••• • - 11 • 11 - - . _ - the actual financial reds for the 12 months ended September 30, 2016. The . . 1 * . - . • * ■ e Where: adjustment in the applicable rates. The PIF represents the estimated requirements of the utility system (the "additional required revenue"). - - e - - - • - - and repair of the water and wastewater systems as reported in the - - .. e - - - "operating expenses" PWE - That component of the operating expenses (OP) that represent the A . . . _ adjusted to include the fee paid to the Department of Environmental PSE - That component of the operating expenses (OP) that represent the - - - - _ EPI - The Consumer Price Index All Urban Consumers. Miami Fort . • , 1,- . - - eA . . - • . - 1 I .• e . A : • . 4 16 e- - ER ER - The total actual revenues earned by the utility system from —the PTR - The total actual revenues earned by the utility system during the other expense that was categorized as a pass through expense and • _ _ _ _ . _ , . - - - Line-No, Amount A nt Refe,-icrerence Total Operating Expenses 4- °P 1$5619°6'238 5R9062' 8 Less: - -= - 2 PWPTR $11,258,442 -_ -e A _ - - - - 3 PSPTR $20,865,353 . - - • e .e • - 4 IPS I0 ' -'- -- a-- - '•= - • - 5-1 234 I$21,782,443I Effective Price Index ERI' April 2015 CPI Index 6 245.195 April 2016 CPI Index 1 218.741 Change in CPI Index 8=7-6 3.546 Annual Percent Change 9i6 14_444 - 10-5"'0 I I$3667 - - - -.. 44 €R $73,291,986 Less: PTR $45749$307 Revenue - - --- - 1-3 $22,679,732 17 =- -- L1--e.". - 14-11 12 13 I $35413,974 15-10/14 0:39% Adjustments: s-av�Crrrr Management 0.00% -Other-Adjustments 4-8 0 0 P. . — ..! 4-9 14,08696 Price Index Adstmen+ 20-15'10 RIF 0.97% (ii) Determination of indexed rates. The indexed rates shall be determined IR - (AR)(1 + PIF) Where: the price index factor PIF - The price index factor determined for the calculation period. (b) Storm water rates. Except as otherwise provided in this subsection, the monthly user rates established in section 110-109 for the stormwater system as shown on schedule in Appendix A and as may be further adjusted automatically in the future by implementation of the automatic rate indexing provisions as specified in Appendix A. shall never be less than 0.0 percent. - - - - - - - - - - - - , - - - - - - - - - - . . Miami Fort Lauderdale, as of April 2017, is 2.8 percent. SECTION 2. That Chapter 110, "UTILITIES," Article IV "Fees, charges, rates and billing procedures," in APPENDIX A is hereby amended asfollows: 18 * * * APPENDIX A FEE SCHEDULE * * * Article IV. Fees, Charges, Rates and Billing Procedure Division 2. Rates, Fees and Charges The monthly water and sewer user rates for Fiscal Years 2021 to 2025 are based on City Commission direction pursuant to a formal rate study completed in 2020. The water user rates are designed to increase water revenues by 0% in Fiscal Year 2021, 1%in Fiscal Year 2022, and 5.48% per year in Fiscal Years 2023 to 2025. The sewer rates are designed to increase sewer revenues by 0% in Fiscal Year 2021, 1% in Fiscal Year 2022, and 2.35% per year in Fiscal Years 2023 to 2025. On a combined basis, the monthly user rates are designed to increase overall utility revenues by 0% in Fiscal Year 2021, 1% in Fiscal Year 2022, and approximately 3.6% to 3.7% per year in Fiscal Years 2023 to 2025. These increases are in addition to the pass-through of future wholesale water and sewer rate increases from the Miami-Dade County Water and Sewer Department after Fiscal Year 2021. After Fiscal Year 2025, the City shall continue to implement automatically the pass-through increases and rate indexing adjustments as allowed by the City Code. 110- 166(a) shaFge Monthly Water Rates 110- Individual Metered 166(a)(1) Residential Service Annual Adjustment (References shown are Rate Rate Rate Rate Rate defined at Effective Effective Effective Effective Effective the end of January October October October October this 1, 2021 1, 2021 1, 2022 1, 2023 1, 2024 Appendix A) Base Facility Charge(per meter size) Rate %-inch $8.32 $8.50 $8.59 $9.06 $9.56 $10.08 [C] 1-inch 8 8.87 8.96 9.45 9.97 10.52 [C] 11/2-inch 963 9.74 9.84 10.38 10.95 11.55 [C] 2-inch 14-(M81 10.61 10.721 11.31 11.931 12.581 [C] 19 3-inch 1-0.90 11.14 11.25 11.87 12.52 13.21 [C] 4-inch 1-2.56 12.83 12.96 13.67 14.42 15.21 [C] Water Consumption Charge(per 1,000 gallons) 0 to 8,000 Gallons $0:96 $0.98 $0.99 $1.04 $1.10 $1.16 [C] 8,001 to 16,000 2.61 2.70 2.73 2.88 3.04 3.21 [C] Gallons 16,001 to 24,000 3,933 4.01 4.05 4.27 4.50 4.75 [C] Gallons Above 24,000 Gallons 5:36 5.48 5.53 5.83 6.15 6.49 [C] Purchased Water Pass-Through Rate (per 1,000 gallons) 'All Water Use 1$4-9g1 $1.881 $1.90 $2.00 I $2.111 $2.231 [C] Master-Metered 110- Multifamily 166(a)(2) Residential Service Annual Adjustment (References shown are Rate Rate Rate Rate Rate defined at Effective Effective Effective Effective Effective the end of January October October October October this 1, 2021 1. 2021 1. 2022 1. 2023 1, 2024 Appendix A) Base Facility Charge(per meter size) Rate %-inch $8.32 $8.50 $8.59 $9.06 $9.56 $10.08 [C] 1-inch 17.96 18.36 18.54 19.56 20.63 21.76 [C] 1'h-inch 34-26 35.01 35.36 37.30 39.34 41.49 [C] 2-inch 5366 54.84 55.39 58.42 61.62 65.00 [C] 3-inch 103.62 105.90 106.96 112.82 119.00 125.52 [C] 4-inch 4-60.92 164.46 166.10 175.20 184.80 194.92 [C] 6-inch 322.38 329.47 332.76 350.99 370.22 390.50 [C] 8-inch 509.101 520.30 ' 525.501 554.281 584.641 616.66 [C] 20 10-inch 730.80 746.88 754.35 795.67 839.25 885.22 [C] 12-inch 1,350.95 1,380.67 1,394.48 1,470.86 1,551.43 1,636.41 [C] Water Consumption Charge(per 1,000 gallons)[•] Block 1 $4-68 $1.72 $1.74 $1.84 $1.94 $2.05 [C] Block 2 2.87 2.94 2.97 3.13 3.30 3.48 [C] Block 3 3.83 3.91 3.95 4.1. 7 4.40 4.64 [C] Purchased Water Pass-Through Rate (per 1,000 gallons) All Water Use $ 99 $1.88 $1.90 $2.00 $2.11 $2.23 [C] ['] Usage blocks by meter size: Size of Meter Block 1 (gallons) Block 2 (gallons) Block 3(gallons) %-inch 0 to 16,000 16,001 to 32,000 Over 32,000 1-inch 0 to 40,000 40,001 to 80,000 Over 80,000 1.5-inch ,0 to 80,000 80,001 to 160,000 Over 160,000 2-inch 0 to 128,000 128,001 to 256,000 Over 256,000 3-inch 0 to 256,000 256,001 to 512,000 Over 512,001 4-inch 0 to 400,000 400,001 to 800,000 Over 800,000 6-inch 0 to 800,000 800,001 to 1,600,000 Over 1,600,000 8-inch 0 to 1,280,000 1,280,001 to 2,560,000 Over 2,560,000 10-inch 0 to 1,840,000 1,840,001 to 3,680,000 Over 3,680,000 112-inch 10 to 3,440,000 3,440,001 to 6,880,000 'Over 6,880,000 110- Nonresidential 166(a)(3) Service Annual Adjustment (References shown are Rate Rate Rate Rate Rate defined at Effective Effective Effective Effective Effective the end of January, October October October October this 1, 2021 1, 2021 1. 2022 1, 2023 1, 2024 Appendix A) 21 Base Facility Charge(per meter size) Rate 3/-inch $8.32 $8.50 $8.59 $9.06 $9.56 $10.08 [C] 1-inch 1-7.96 18.36 18.54 19.56 20.63 21.76 [C] 11/2-inch 34.26 35.01 35.36 37.30 39.34 41.49 [C] 2-inch 53.66 54.84 55.39 58.42 61.62 65.00 [C] 3-inch 103.62 105.90 106.96 112.82 119.00 125.52 [C] 4-inch 160.92 164.46 166.10 175.20 184.80 194.92 [C] 6-inch 322.38 329.47 332.76 350.99 370.22 390.50 [C] 8-inch 50940 520.30 525.50 554.28 584.64 616.66 [C] 10-inch 730.80 746.88 754.35 795.67 839.25 885.22 [C] 12-inch 1,350.95, 1.380.67 1,394.48 1,470.86 1,551.43 1,636.41 [C] Water Consumption Charge (per 1,000 gallons) ['] Block 1 1-:68 $1.72 $1.74 $1.84 $1.94 $2.05 [C] Block 2 2.87 2.94 2.97 3.13 3.30 3.48 [C] Block 3 3:83 3.91 3.95 4.17 4.40 4.64 [C] Purchased Water Pass-Through Rate (per 1,000 gallons) All Water Use 4,99 $1.88 $1.90 $2.00 $2.11 $2.23 [C] ['] Usage blocks by meter size: Size of Meter Block 1 (gallons) Block 2 (gallons) Block 3 (gallons) 3/-inch 0 to 16,000 16,001 to 32,000 Over 32,000 1-inch 0 to 40,000 40,001 to 80,000 Over 80,000 1.5-inch 0 to 80,000 80,001 to 160,000 Over 160,000 2-inch 0 to 128,000 128,001 to 256,000 Over 256,000 3-inch 0 to 256,000 256,001 to 512,000 Over 512,001 4-inch 0 to 400,000 400,001 to 800,000 Over 800,000 6-inch 0 to 800,000 800,001 to 1,600,000 Over 1,600,000 8-inch 0 to 1,280,000 1,280,001 to 2,560,000 Over 2,560,000 10-inch 0 to 1,840,000 1,840,001 to 3,680,000 Over 3,680,000 12-inch 10 to 3,400,000 13,440,001 to 6,880,000 I Over 6,880,000 22 110- Individual Metered 166(a)(4) Residential Irrigation Service Annual Adjustment (References shown are Rate Rate Rate Rate Rate defined at Effective Effective Effective Effective Effective the end of January October October October October this 1, 2021 1, 2021 1, 2022 1, 2023 1, 2024 Appendix A) Base Facility Charge(per meter size) Rate %-inch 8.32 _$8.50 $8.59 $9.06 $9.56 $10.08 [C] 1-inch 8,68 8.87 8.96 9.45 9.97 10.52 [C] 1%-inch 953 9.74 9.84 10.38 10.95 11.55 [C] 2-inch 4-0.38 10.61 10.72 11.31 11.93 12.58 [C] 3-inch 4-0,90 11.14 11.25 11.87 12.52 13.21 [C] 4-inch 42,56 12.83 12.96 13.67 14.42 15.21 [C] Water Consumption Charge (per 1,000 gallons) 0 to 16,000 Gallons 2.63 $2.69 $2.72 $2.87 $3.03 $3.20 [C] Above 16,000 5-36 5.48 5.53 5.83 6.15 6.49 [C] Gallons Purchased Water Pass-Through Rate (per 1,000 gallons) All Water Use. 1-:99 $1.88 $1.90 $2.00 $2.11 $2.23 [C] Master-Metered 110- Multifamily 166(a)(5) Residential Irrigation Service Annual Adjustment (References shown are Rate Rate Rate Rate Rate defined at Effective Effective Effective Effective Effective the end of January October October October October this 1, 2021 1, 2021 1. 2022 1, 2023 1, 2024 'Appendix A) 23 Base Facility Charge(per meter size) Rate 3A-inch &32 $8.50 $8.59 $9.06 $9.56 $10.08 [C] 1-inch 4-7.96 18.36 18.54 19.56 20.63 21.76 [C] 11/2-inch 346 35.01 35.36 37.30 39.34 41.49 [C] 2-inch 53.66 54.84 55.39 58.42 61.62 65.00 [C] 3-inch 462 105.90 106.96 112.82 119.00 125.52 [C] 4-inch 4-60.92 164.46 166.10 175.20 184.80 194.92 [C] 6-inch 322.38 329.47 332.76 350.99 370.22 390.50 [C] 8-inch 5090 520.30 525.50 554.28 584.64 616.66 [C] 10-inch 730.80 746.88 754.35 795.67 839.25 885.22 [C] 12-inch 1,350.95 1,380.67 1,394.48 1,470.86 1,551.43 1,636.41 [C] Water Consumption Charge(per 1,000 gallons) r] ] Block 1 2.63 $2.69 $2.72 $2.87 $3.03 $3.20 [C] Block 2 5:36 5A8 5.53 5.83 6.15 6A9 [C] Purchased Water Pass-Through Rate (per 1,000 gallons) All Water Use 4,99 $1.88 $1.90 $2.00 $2.11 $2.23 [C] [*I Usage blocks by meter size: Size of Block 1 (gallons) Block 2 Meter (gallons) 3A-inch 0 to 32,000 Over 32,000 1-inch 0 to 80,000 Over 80,000 1.5-inch 0 to 160,000 Over 160,000 2-inch 0 to 256,000 Over 256,000 3-inch 0 to 512,000 Over 512,001 4-inch 0 to 800,000 Over 800,000 24 6-inch 0 to 1,600,000 Over 1,600,000 8-inch 0 to 2,560,000 Over 2,560,000 10-inch 0 to 3,680,000 Over 3,680,000 12-inch 0 to 6,880,000 Over 6,880,000 110- Nonresidential 166(a)(6) Irrigation Service Annual Adjustment (References shown are Rate Rate Rate Rate Rate defined at Effective Effective Effective Effective Effective the end of January October October October October this 1, 2021 1, 2021 1, 2022 1, 2023 1, 2024 Appendix A) Base Facility Charge(per meter size) Rate %-inch 8 $8.50 $8.59 $9.06 $9.56 $10.08 [C] 1-inch 96 18.36 18.54 19.56 20.63 21.76 [C] 11/2-inch 34,26 35.01 35.36 37.30 39.34 41.49 [C] 2-inch 53.66 54.84 55.39 58.42 61.62 65.00 [C] 3-inch 103.62 105.90 106.96 112.82 1.19.00 125.52 [C] 4-inch 4-60.92 164.46 166.10 175.20 184.80 194.92 [C] 6-inch 322.38 329.47 332.76 350.99 370.22 390.50 [C] 8-inch 5090 520.30 525.50 554.28 584.64 616.66 [C] 10-inch 730.80 746.88 754.35 795.67 839.25 885.22 [C] 1 12-inch 1,350.9511,380.6711,394.48 1,470.8611,551.4311,636.41 [C] Water Consumption Charge(per 1,000 gallons) [' Block 1 2.63 $2.69 $2.72 $2.87 $3.03 $3.20 [C] Block 2 536 5.48 5.53 5.83 6.15 6.49 [C] Purchased Water Pass- 25 Through Rate (per 1,000 gallons) All Water Use 1,99 $1.88 $1.90 $2.00 $2.11 $2.23 [C] ['] Usage blocks by meter size: Size of Meter Block 1 (gallons) Block 2 (gallons) 3/4-inch 0 to 32,000 Over 32,000 1-inch 0 to 80,000 Over 80,000 1.5-inch 0 to 160,000 Over 160,000 2-inch 0 to 256,000 Over 256,000 3-inch 0 to 512,000 Over 512,001 4-inch 0 to 800,000 Over 800,000 6-inch 0 to 1,600,000 Over 1,600,000 8-inch 0 to 2,560,000 Over 2,560,000 10-inch 0 to 3,680,000 Over 3,680,000 12-inch 10 to 6,880,000 Over 6,880,000 * * * 110- Monthly Sewer 168(a) Rates 110- Individual metered 168(a)(1) residential service: Annual Adjustment (References shown are Rate Rate Rate Rate Rate defined at Effective Effective Effective Effective Effective the end of January October October October October this 1, 2021 1, 2021 1. 2022 1, 2023 1, 2024 Appendix A) Base facility charge (all meter sizes) Rate All meter sizes 8:99 $9.19 $9.28 $9.50 $9.72 $9.95 [D] Sewer consumption charge (per 1,000 gallons) 26 All gallons (based on metered water 1.53 $4.63 $4.68 $4.79 $4.90 $5.02 [D] consumption) Purchased sanitary sewer pass-through rate (per 1,000 gallons) All gallons (based on metered water 5.33 $5.51 $5.57 $5.70 $5.83 $5.97 [D] consumption Master-metered 110- multifamily 168(a)(2) residential service: Annual Adjustment (References shown are Rate Rate Rate Rate Rate defined at Effective Effective Effective Effective Effective the end of January October October October October this 1, 2021 1, 2021 1, 2022 1, 2023 1, 2024 Appendix A) Base facility charge tie (per meter size) %-inch 8:98 $9.19 $9.28 $9.50 $9.72 $9.95 [D] 1-inch 220.08 20.52 20.73 21.22 21.72 22.23 [D] 11/2-inch 3857 39.42 39.81 40.74 41.70 42.68 [D] 2-inch 60.75 62.09 62.71 64.18 65.69 67.23 [D] 3-inch 119.91 122.55 123.78 126.69 129.66 132.70 [D] 4-inch 186.47 190.57 192.48 197.00 201.62 206.35 [D] 6-inch 371.31 379.51 383.31 392.31 401.52 410.95 [D] 8-inch 59348 606.23 612.29 626.66 641.37 656.43 [D] 10-inch 852.00 870.74 879.45 900.10 921.23 942.86 [D] 12-inch 1,591.48 1,626.49 1,642.75 1,681.31 1,720.78 1.761.18 [D] Sewer consumption charge(per 1,000 gallons): All gallons (based on metered water 4.53 $4.63 $4.68 $4.79 $4.90 $5.02 [D] consumption) 27 Purchased sanitary sewer pass-through rate (per 1,000 gallons): All gallons (based on metered water 5,33 $5.51 $5.57 $5.70 $5.83 $5.97 [D] consumption) 110- Nonresidential 168(a)(3) service: Annual Adjustment (References shown are Rate Rate Rate Rate Rate defined at Effective Effective Effective Effective Effective the end of January October October October October this 1, 2021 1, 2021 1, 2022 1, 2023 1, 2024 Appendix A) Base facility charge Rate (per meter size) 34-inch 8:99 $9.19 $9.28 $9.50 $9.72 $9.95 [D] 1-inch 20.08 20.52 20.73 21.22 21.72 22.23 [D] 1'/2-inch 38,57 39.42 39.81 40.74 41.70 42.68 [D] 2-inch 6975 62.09 62.71 64.18 65.69 67.23 [D] 3-inch 119.91 122.55 123.78 126.69 129.66 132.70 [D] 4-inch 186.47 190.57 192.48 197.00 201.62 206.35 [D] 6-inch 37-1.34 379.51 383.31 392.31 401.52 410.95 [D] 8-inch 59348 606.23 612.29 626.66 641.37 656.43 [D] 10-inch 852.00 870.74 879.45 900.10 921.23 942.86 [D] 12-inch 1,591.'18 1,626.49 1,642.75 1,681.31 1,720.78 1,761.18 [D] Sewer consumption charge(per 1,000 gallons): All gallons (based on metered water /1.53 $4.63 $4.68 $4.79 $4.90 $5.02 [D] consumption) Purchased sanitary sewer pass-through rate(per 1,000 gallons): 28 All gallons (based on metered water 643 $5.51 $5.57 $5.70 $5.83 $5.97 [D] consumption) * * * Annual Adjustment Reference Definitions: * * * [C] = Pass-Through of Purchased Wholesale Water Charges and Rate Indexing. Pass-Through of Purchased Wholesale Water Charges. The Purchased Water Pass-Through Rate, which is applied to all water consumers being billed for potable water service, shall be increased or decreased by the city by applying a pass- through adjustment factor for any change in the average annual rates charged to the city for wholesale potable water purchased from the Miami-Dade Water and Sewer Department ("WASD") to the Purchased Water Pass-Through Rate charged by the city (the "Purchased Water Pass-Through Adjustment"). (1) Adjustment schedule. The implementation of the adjustment to the Purchased Water Pass-Through Rate for any month that a change in wholesale potable water rates by WASD is effectuated ("Water Cost Recovery") shall occur without a public hearing. Water Cost Recovery shall be employed each time that WASD adjusts the average annual wholesale potable water rates that are billed to the city. Any adjustment to the Purchased Water Pass-Through Rate based on the determination of the change in wholesale rates shall be implemented in the month immediately following the determination of the Purchased Water Pass-Through Adjustment. The Purchased Water Pass- Through Rate as shown sin Appendix A and as may be further adjusted automatically in the future by the implementation of the provisions of this section and which are then in effect shall be increased or decreased by the city by applying a Purchased Water Pass-Through Adjustment established in accordance with this subsection to the then effective Purchased Water Pass- Through Rate prior to such application. Nothing herein shall preclude the city from making additional changes to the monthly water user rates for service. (2) Applicability of Purchased Water Rates. The Purchased Water Pass-Through Rate shall be in addition to any water consumption rates for all retail and wholesale customers that are billed for potable water service by the city. The following are the customers that shall be subject to the application of the Purchased Water Pass-through Rate and shall be subject to the pass-through for changes in the cost of purchased water from WASD (the "Applicable Customers"): (i) The retail water customer classes that are billed the water consumption charge referenced in this section. 29 (ii) All separate utilities or local governments that may receive wholesale potable water service provided by the city currently or in the future that are not considered to be retail customers. (3) Calculation of Purchased Water Pass-Through Adjustment. The Purchased Water Pass-Through Adjustment shall be calculated using the following formula: PWPTA = ((IWWC - PWWC) * (1/(1-(DF + T + 0))) Where: PWPTA = The Purchased Water Pass-Through Adjustment to be used for Water Cost Recovery to determine the monetary adjustment in the Purchased Water Pass-through Rate to be applied the Applicable Customers. The PWPTA represents the respective dollar increase or decrease to account for changes in wholesale potable water rates charged by WASD to the city that is added or subtracted, respectively to the Purchased Water Pass-Through Rate. IWWC = The increased annual average wholesale or purchased water rate charged by WASD expressed on a dollar per 1,000 gallons basis that became effective for the month immediately after the PWWC. PWWC = The prior annual average wholesale or purchased water rate charged by WASD expressed on a dollar per 1,000 gallons basis immediately prior to the billing of the adjusted wholesale or purchased water rate defined as the IWWC. DF = The fee paid to the Department of Environmental Resources Management (DERM)which is based on a percent of rate revenues billed by the city. T=Any and all taxes or tax equivalents that may be paid by the water system that is based on revenues billed by the city, including any payment in lieu of tax imposed by the city on its water system. 0 = Any and all charges that may be paid by the city on behalf of the water system that is based on revenues billed by the city, including any funding of renewals and replacement fund deposits that is determined as a percent of revenues billed. (4) Determination of Purchased Water Pass-Through Rate. The Purchased Water Pass-Through Rate shall be determined based on the addition or subtraction of the Purchased Water Pass-Through Adjustment to the rates in effect immediately preceding such adjustment and shall be rounded to the nearest cent. The Purchased Water Pass-Through Adjustment application shall be based on the following formula: APWTR = PWPTR + PWPTA 30 Where: APWTR = The Adjusted Purchased Water Pass-Through Rate that is to be placed in effect after the application of the Purchased Water Pass-Through Adjustment to all Applicable Customers billed for potable water service. PWPTR = The Purchased Water Pass-Through Rate in effect immediately prior to the application of the PWPTA. PWPTA = The Purchased Water Pass-Through Adjustment as determined as a result of a change in wholesale water rates as billed by WASD. (5) [Example of calculation.]An example of the calculation of the determination of the Purchased Water Pass-Through Adjustment and the corresponding change to the Purchased Water Pass-Through Rate is illustrated in the following table: Line No. Formula Amount Reference Prior Wholesale Purchased Water Rate($/1,000 gallons) 1 PWWC $1.7350 Increased Wholesale Purchased Water Rate($/1,000 gallons) 2 IWWC $1.7700 Percent Change in Wholesale Purchased Water Rate 3=(2-1)/1 2.02% Adjustments Department of Environmental Resources Management 4 DF 8.00% Taxes and Tax Equivalents 5 T 0.00% Other Adjustments 6 0 0.00% Adjustment Factor= 1/1-(D+T+O))=1/0.92 7 1.08696 Purchased Water Pass-Through Percent Adjustment 8=(3*7) 2.20% Prior Purchased Water Pass-Through Rate($/1,000 gallons) 9 PWPTR $1.93 Purchased Water Pass-Through Adjustment 10=9*8 PWPTA $0.04 Adjusted Purchased Water Pass-Through Rate($/1,000 11=9+10 APWTR $1.97 gallons) Pass-Through Adjustment Charges. The Applicable Rates as may be further adjusted automatically in the future by the implementation of the provisions as contained in this Appendix A and which are then in effect shall be increased or decreased by the city by applying a pass-through adjustment factor established in accordance with this subsection (the "Pass-Through Factor") to the then effective Applicable Rates for increases or decreases in the Applicable Costs. All Applicable Rates so adjusted (the "Pass-Through Rates") shall be charged by the city's water system. (1) Adjustment Schedule. The implementation of Pass-Through Rates for any month associated with a change in Applicable Costs ("Cost Recovery") shall be placed into effect automatically and shall occur without a public hearing. 31 Nothing herein shall preclude the city from making additional changes to the monthly water user rates for service. (2) Applicable Rates. The water base facility, water consumption charges, and Purchased Water Pass-through Rate referenced in subsection 110-166(a)shall be subject to Cost Recovery. (3) Applicable Costs. Only the following cost categories qualify as Applicable Costs for Cost Recovery: (i) All increases or decreases in the percentage charge of the Department of Environmental Resources Management. (ii) All increases or decreases in the application of any tax or tax equivalents, including any payment in lieu of tax imposed by the city on its water system. (iii)All other cost increases incurred by the water system as a result of any regulatory changes or requirements imposed by any regulatory agency having jurisdiction over the utility system operations (a "Regulator"). (4) Calculation of Pass-Through Factor. The Pass-Through Factor shall be calculated using the following formula: PTF = ARR/ER Where: PTF = The Pass-Through Factor used for Cost Recovery to determine the monetary adjustment in the Applicable Rates. The PTF represents the estimated annual increase in the Applicable Costs, expressed as a percentage of the most recent historical revenues derived from the Applicable Rates for the most recently completed fiscal year. ARR = Additional Required Revenue equal to the estimated annual change in the Applicable Costs that will affect the overall cost of providing water system services as determined by the city. ER = The total actual revenues earned by the Enterprise System from the Applicable Rates for the potable water system as reported in the city for the most recently completed fiscal year. (5) Determination of Pass-Through Rates. The Pass-Through Rates shall be determined based on the Pass-Through Factor applied uniformly to the Applicable Rates in effect and shall be rounded to the nearest cent. The Pass- through application shall be based on the following formula: PTR = (AR)(1 + PTF) Where: PTR =The Pass-Through Rates that are to be placed in effect for the current fiscal year through application of the Pass-Through Factor. 32 AR = The Applicable Rates in effect immediately prior to the application of the Pass-Through Factor. PTF = The Pass-Through Factor as determined by the city to recover the net change in Applicable Costs. Rate Indexing. Effective for all bills rendered on or after October 1, 2025, and except as otherwise provided,the monthly user rates established in subsections 110-167(a) for the water system and 110-168(a) for the sanitary sewer system (collectively, the "applicable rates") as shown in Appendix A and as may be further adjusted automatically in the future by implementation of the provisions of this section and which are then in effect shall be increased by the city each year by applying the price index factor established for that year in accordance with this subsection (the "price index factor") to the then applicable rates to offset the effects of inflation on the cost of operating and maintaining the system. The Rate Index shall never be less than 0.0%. All applicable rates so adjusted (the "indexed rates") shall be implemented by the city. (1) Adjustment schedule. Each implementation of indexed rates ("rate indexing") shall be placed into effect automatically and shall occur without a public hearing. Rate indexing shall not be employed more than once in any fiscal year. Any indexed rates based on the operating and maintenance expenses for the most recently completed fiscal year shall be implemented as of October 1 of the subsequent fiscal year. Nothing herein shall preclude the city from making additional changes to the water or wastewater rates for service. (2) Applicable rates. The water base facility charge and water consumption charges referenced in subsection 110-167(a)for the water system and sanitary sewer base facility charge and sanitary sewer consumption charges referenced in subsection 110-168(a) for the sanitary sewer system shall be subject to rate indexing. The purchased water pass-through rate and the purchased sanitary sewer pass-through rates as referenced in the respective subsections shall not be subject to rate indexing. (3) Calculation of price index factor. The price index factor shall be determined based on the actual reported financial results as contained in the annual comprehensive annual financial report and the records for the most recently completed fiscal year preceding the determination of the rate index (the "calculation period"). By way of example, the rate index to be applied on October 1, 2017 would be based on the actual financial results for the 12 months ended September 30, 2016. The price index factor shall be calculated using the following formula: PIF = ([OP- (PWE+PSE+PT)]*EPI)/[(ER-PTR)/ * (1/(1- (DF+T+O)))] Where: PIF =The price index factor used for rate indexing to determine the monetary adjustment in the applicable rates. The PIF represents the estimated increase in operation and maintenance expenses during the calculation 33 period that is subject to inflation, expressed as a percentage of applicable rates revenues earned during the calculation period. The amount of the rate index increase is a component of any additional revenue required by the utility system to ensure compliance with the bond covenants and fiscal requirements of the utility system (the "additional required revenue"). OP = The total expenses, paid or accrued, for the operations, maintenance, and repair of the water and wastewater systems as reported in the comprehensive annual financial report and other financial records for the city for the calculation period after excluding: (a) allowances for depreciation and amortization expense; and (b) capitalized salaries and other overhead related to the city's capital improvement program (CIP). Such total expenses as adjusted for the stated exclusions are hereinafter referred to as the "operating expenses". PWE = That component of the operating expenses (OP) that represent the cost of purchased water service from WASD for the calculation period, adjusted to include the fee paid to the Department of Environmental Resources Management (DERM) which is based on a percent of rate revenues billed by the city for this component of expense. PSE = That component of the operating expenses (OP) that represent the cost of purchased sanitary sewer service from WASD for the calculation period, adjusted to include the fee paid to the Department of Environmental Resources Management (DERM) which is based on a percent of rate revenues billed by the city for this component of expense. PT = The sum of all other components of the operating expenses (OP) for the Calculation Period for which increases in those components may be recovered separately as a pass-through adjustment pursuant to subsections 110-167(d) for the water system and 110-168(a) for the wastewater system. EPI = The Consumer Price Index - All Urban Consumers. Miami-Fort Lauderdale-West Palm Beach (Series ID: CUURS35BSA0), as published by Bureau of Labor Statistics (the "effective price index") as reported for the month of April of the current year compared to the index reported for the immediately preceding month of April. By way of example, the effective price index published by Bureau of Labor Statistics-All Urban Consumers. Miami- Fort Lauderdale, as of April 2015 was 245.195 and as of April 2016 was 248.741 or a change of 1.446% which shall be applied to the applicable operating expenses reported for fiscal year 2015. ER = The total actual revenues earned by the utility system from the applicable rates as reported in the comprehensive annual financial reports and other financial records for the calculation period. PTR = The total actual revenues earned by the utility system during the calculation period from the application of i) the purchased-water pass- 34 through rate; ii) the purchased-wastewater pass-through rate; and iii) any other expense that was categorized as a pass-through expense and separately evaluated. (4) Price index calculation example. (i) An example of the calculation of the Price Index Factor based on reported fiscal year 2015 information is illustrated in the following table: Line No. Formula Reference Amount Total Operating Expenses 1 OP $56,906,238 Less: Purchased Water Expenses 2 PWPTR $14,258,442 Purchased Wastewater Expenses 3 PSPTR 20,865,353 Other Pass-through Expenses 4 PT 0 Adjusted Operating Expenses 5=1-2-3-4 $21,782,443 Effective Price Index EPI April 2015 CPI Index 6 245.195 April 2016 CPI Index 7 248.741 Change in CPI Index 8=7-6 3.546 Annual Percent Change 9=8/6 1.44% Additional Required Revenue(Numerator) 10=5*9 $313,667 Actual Applicable Rate Revenues Earned 11 ER $73,291,986 Less: PTR Purchased-Water Pass-Through Rate Revenue 12 $15,498,307 Purchased-Sanitary Sewer Pass-Through Rate 13 22,679,732 Revenue Applicable-Rate Revenue(Denominator) 14=11-12-13 $35,113,974 Price Index Factor before Adjustments 15=10/14 0.89% Adjustments: Department of Environmental Resources 16 DF 8.00% Management Taxes and Tax Equivalents 17 T 0.00% j Other Adjustments 18 0 0.00% Adjustment Factor= 1/(1-(D+T+O))=1/0.92 19 1.08696 1 Price Index Adjustment 120=15*19 1 PIF 10.97% (ii) Determination of indexed rates. The indexed rates shall be determined based on the price index factor applied uniformly to the applicable rates 35 in effect and shall be rounded to the nearest cent. The determination shall be based on the following formula: IR = (AR)(1 + PIF) Where: IR = The indexed applicable rates that are to be placed in effect in the current fiscal year through application of the price index factor. AR = The applicable rates in effect immediately prior to the application of the price index factor. PIF = The price index factor determined for the calculation period. [D] = Pass-Through of Purchased Wholesale Sanitary Sewer Charges and Rate Indexing. Pass-Through of Purchased Wholesale Sanitary Sewer Charges. The Purchased Sanitary Sewer Pass-Through Rate, which is applied to all sanitary sewer consumers being billed for sewer service, shall be increased or decreased by the city by applying a pass-through adjustment factor for any change in the rates charged to the city for wholesale wastewater treatment and disposal services purchased from WASD (the "Sanitary Sewer Pass-Through Adjustment") to the Purchased Sanitary Sewer Pass-Through Rate charged by the city. (1) Adjustment schedule. The implementation of the adjustment to the Purchased Sanitary Sewer Pass-Through Rate for any month that a change in wholesale sanitary sewer rates by WASD is effectuated ("Sewer Cost Recovery") shall occur without a public hearing. Sewer Cost Recovery shall be employed each time that WASD adjusts the average annual wholesale sanitary sewer rates that are billed to the city. Any adjustment to the Purchased Sanitary Sewer Pass-Through Rate based on the determination of the change in wholesale rates shall be implemented in the month immediately following the determination of the Purchased Sanitary Sewer Pass-Through Adjustment. The Purchased Sanitary Sewer Pass-Through Rate as shown Gin Appendix A and as may be further adjusted automatically in the future by the implementation of the provisions of this section and which are then in effect shall be increased or decreased by the city by applying a Purchased Sanitary Sewer Pass-Through Adjustment established in accordance with this subsection to the then effective Purchased Sanitary Sewer Pass-Through Rate prior to such application. Nothing herein shall preclude the city from making additional changes to the monthly sanitary sewer user rates for service. (2) Applicability of Purchased Sanitary Sewer Rates. The Purchased Sanitary Sewer Pass-Through Rate shall be in addition to any sewer consumption rates for all retail and wholesale customers that are billed for wastewater treatment and disposal services by the city. The following are the customers that shall be subject to the application of the Purchased Sanitary Sewer Pass-Through Rate 36 and shall be subject to the pass-through for changes in the cost of purchased wastewater treatment and disposal services from WASD (the "Applicable Customers"): (i) The retail water customer classes that are billed the sewer consumption charge referenced in this section. (ii) All separate utilities or local governments that may receive wholesale sewer service provided by the city currently or in the future which is not considered as retail customers. (3) Calculation of Purchased Sanitary Sewer Pass-Through Adjustment. The Purchased Sanitary Sewer Pass-Through Adjustment shall be calculated using the following formula: PSPTA = ((IWWC - PWWC) * (1/(1-(DF + T + 0))) Where: PSPTA=The Purchased Sanitary Sewer Pass-Through Adjustment to be used for Sewer Cost Recovery to determine the monetary adjustment in the Purchased Sanitary Sewer Pass-through Rate to be applied the Applicable Customers. The PSPTA represents the respective dollar increase or decrease to account for changes in average annual wholesale wastewater rates charged by WASD to the city that is added or subtracted, respectively to the Purchased Sanitary Sewer Pass-Through Rate. IWSC =The increased average annual wholesale or purchased sanitary sewer rate charged by WASD expressed on a dollar per 1,000-gallons basis that became effective for the month immediately after the PWSC. PWSC = The prior average annual wholesale or purchased sanitary sewer rate charged by WASD expressed on a dollar per 1,000-gallons basis immediately prior to the billing of the adjusted wholesale or purchased sewer rate by WASD. DF = The fee paid to the Department of Environmental Resources Management (DERM) which is based on a percent of rate revenues billed by the city. T = Any and all taxes or tax equivalents that may be paid by the sewer system that is based on revenues billed by the city, including any payment in lieu of tax imposed by the city on its sanitary sewer system. O = Any and all charges that may be paid by the city on behalf of the sanitary sewer system that is based on revenues billed by the city, including any funding of renewals and replacement fund deposits that is determined as a percent of revenues billed. (4) Determination of Purchased Sanitary Sewer Pass-Through Rate. The Purchased Sanitary Sewer Pass-Through Rate shall be determined based on the addition or subtraction of the Purchased Sanitary Sewer Pass-Through 37 Adjustment to the rates in effect immediately preceding such adjustment and shall be rounded to the nearest cent. The Purchased Sanitary Sewer Pass- Through Adjustment application shall be based on the following formula: APSTR = PSTR + PSPTA Where: APSTR = The Adjusted Purchased Sanitary Sewer Pass-Through Rate that is to be placed in effect after the application of the Purchased Sewer Pass- Through Adjustment to all Applicable Customers billed for wastewater service. PSTR = The Purchased Sanitary Sewer Pass-Through Rate in effect immediately prior to the application of the PSPTA. PSPTA = The Purchased Sanitary Sewer Pass-Through Adjustment as determined as a result of a change in wholesale wastewater rates as billed by WASD. (5) [Example of calculation.]An example of the calculation of the determination of the Purchased Sanitary Sewer Pass-Through Adjustment and the corresponding change to the Purchased Sanitary Sewer Pass-Through Rate is illustrated in the following table: Line No. Formula Amount Reference Prior Wholesale Purchased Sanitary Sewer Rate ($/1,000 gallons) 1 PWSC $2.7879 Increased Wholesale Purchased Sanitary Sewer Rate($/1,000 2 IWSC $2.9477 gallons) Percent Change in Wholesale Purchased Sanitary Sewer Rate 3=(2- )9 5.73% Adjustments IDepartment of Environmental Resources Management 4 DF 8.00% Taxes and Tax Equivalents 5 T 0.00% Other Adjustments 6 0 0.00% Adjustment Factor= 1/(1-(D+T+O))=1/0.92 7 1.08696 Purchased Sewer Pass-Through Percent Adjustment 8=(3*7) 6.22% Prior Purchased Sanitary Sewer Pass-Through Rate ($/1,000 9 PSTR $3.50 i gallons) Purchased Sanitary Sewer Pass-Through Adjustment 10=9*8 PSPTA $0.22 Adjusted Purchased Sanitary Sewer Pass-Through Rate($/1,000 11=9+10 APSTR $3.72 gallons) 38 Pass-Through Adjustment Charges. The Applicable Rates as shown in Appendix A and as may be further adjusted automatically in the future by implementation of the provisions of this section and which are then in effect shall be increased or decreased by the city by applying a pass-through adjustment factor established in accordance with this subsection (the "Pass-Through Factor") to the Applicable Rates for increases or decreases in the Applicable Costs. All Applicable Rates so adjusted (the "Pass-Through Rates") shall be charged by the city's sanitary sewer system. (1) Adjustment Schedule. The implementation of Pass-Through Rates for any month associated with a change in Applicable Costs ("Cost Recovery") shall be placed into effect automatically and shall occur without a public hearing. Nothing herein shall preclude the city from making additional changes to the monthly sanitary sewer user rates for service. (2) Applicable Rates. The sewer base facility, sewer consumption charges, and Purchased Sewer Pass-through Rate referenced in subsection 110-167(a) shall be subject to Cost Recovery. (3) Applicable Costs. Only the following cost categories qualify as Applicable Costs for Cost Recovery: (i) All increases or decreases in the percentage charge of the Department of Environmental Resources Management. (ii) All increases or decreases in the application of any tax or tax equivalents, including any payment in lieu of tax imposed by the city on its sanitary sewer system. (iii) All other cost increases incurred by the sanitary sewer system as a result of any regulatory changes or requirements imposed by any regulatory agency having jurisdiction over the utility system operations (a "Regulator"). (4) Calculation of Pass-Through Factor. The Pass-Through Factor shall be calculated using the following formula: PTF = ARR/ER Where: PTF = The Pass-Through Factor used for Cost Recovery to determine the monetary adjustment in the Applicable Rates. The PTF represents the estimated annual increase in the Applicable Costs, expressed as a percentage of the most recent historical revenues derived from the Applicable Rates for the most recently completed fiscal year. ARR =Additional Required Revenue equal to the estimated annual change in the Applicable Costs that will affect the overall cost of providing sanitary sewer system services as determined by the city. 39 ER = The total actual revenues earned by the Enterprise System from the Applicable Rates for the sanitary sewer system as reported in the city for the most recently completed fiscal year. (5) Determination of Pass-Through Rates. The Pass-Through Rates shall be determined based on the Pass-Through Factor applied uniformly to the Applicable Rates in effect and shall be rounded to the nearest cent. The Pass- through application shall be based on the following formula: PTR = (AR)(1 + PTF) Where: PTR=The Pass-Through Rates that are to be placed in effect for the current fiscal year through application of the Pass-Through Factor. AR = The Applicable Rates in effect immediately prior to the application of the Pass-Through Factor. PTF = The Pass-Through Factor as determined by the city to recover the net change in Applicable Costs. Rate Indexing. Effective for all bills rendered on or after October 1, 2025, and except as otherwise provided, the monthly user rates established in subsections 110-167(a) for the water system and 110-168(a)for the sanitary sewer system (collectively, the "applicable rates") as shown on Appendix A and as may be further adjusted automatically in the future by implementation of the provisions of this section and which are then in effect shall be increased by the city each year by applying the price index factor established for that year in accordance with this subsection (the "price index factor") to the then applicable rates to offset the effects of inflation on the cost of operating and maintaining the system. The Rate Index shall never be less than 0.0%. All applicable rates so adjusted (the "indexed rates") shall be implemented by the city. (1) Adjustment schedule. Each implementation of indexed rates ("rate indexing") shall be placed into effect automatically and shall occur without a public hearing. Rate indexing shall not be employed more than once in any fiscal year. Any indexed rates based on the operating and maintenance expenses for the most recently completed fiscal year shall be implemented as of October 1 of the subsequent fiscal year. Nothing herein shall preclude the city from making additional changes to the water or wastewater rates for service. (2) Applicable rates. The water base facility charge and water consumption charges referenced in subsection 110-167(a)for the water system and sanitary sewer base facility charge and sanitary sewer consumption charges referenced in subsection 110-168(a)for the sanitary sewer system shall be subject to rate indexing. The purchased water pass-through rate and the purchased sanitary sewer pass-through rates as referenced in the respective subsections shall not be subject to rate indexing. 40 (3) Calculation of price index factor. The price index factor shall be determined based on the actual reported financial results as contained in the annual comprehensive annual financial report and the records for the most recently completed fiscal year preceding the determination of the rate index (the "calculation period"). By way of example, the rate index to be applied on October 1, 2017 would be based on the actual financial results for the 12 months ended September 30, 2016. The price index factor shall be calculated using the following formula: PIF = ([OP- (PWE+PSE+PT)]*EPI)/[(ER-PTR)/* (1/(1- (DF+T+O)))] Where: PIF = The price index factor used for rate indexing to determine the monetary adjustment in the applicable rates. The PIF represents the estimated increase in operation and maintenance expenses during the calculation period that is subject to inflation, expressed as a percentage of applicable rates revenues earned during the calculation period. The amount of the rate index increase is a component of any additional revenue required by the utility system to ensure compliance with the bond covenants and fiscal requirements of the utility system (the "additional required revenue"). OP =The total expenses, paid or accrued, for the operations, maintenance, and repair of the water and wastewater systems as reported in the comprehensive annual financial report and other financial records for the city for the calculation period after excluding: (a)allowances for depreciation and amortization expense: and (b) capitalized salaries and other overhead related to the city's capital improvement program (CIP). Such total expenses as adjusted for the stated exclusions are hereinafter referred to as the "operating expenses". PWE = That component of the operating expenses (OP) that represent the cost of purchased water service from WASD for the calculation period, adjusted to include the fee paid to the Department of Environmental Resources Management (DERM) which is based on a percent of rate revenues billed by the city for this component of expense. PSE = That component of the operating expenses (OP) that represent the cost of purchased sanitary sewer service from WASD for the calculation period, adjusted to include the fee paid to the Department of Environmental Resources Management (DERM) which is based on a percent of rate revenues billed by the city for this component of expense. PT = The sum of all other components of the operating expenses (OP) for the Calculation Period for which increases in those components may be recovered separately as a pass-through adjustment pursuant to subsections 110-167(d) for the water system and 110-168(a) for the wastewater system. 41 EPI = The Consumer Price Index - All Urban Consumers. Miami-Fort Lauderdale-West Palm Beach (Series ID: CUURS35BSA0), as published by Bureau of Labor Statistics (the "effective price index")as reported for the month of April of the current year compared to the index reported for the immediately preceding month of April. By way of example, the effective price index published by Bureau of Labor Statistics -All Urban Consumers, Miami-Fort Lauderdale, as of April 2015 was 245.195 and as of April 2016 was 248.741 or a change of 1.446%which shall be applied to the applicable operating expenses reported for fiscal year 2015. ER = The total actual revenues earned by the utility system from the applicable rates as reported in the comprehensive annual financial reports and other financial records for the calculation period. PTR = The total actual revenues earned by the utility system during the calculation period from the application of i) the purchased-water pass- through rate; ii) the purchased-wastewater pass-through rate: and iii) any other expense that was categorized as a pass-through expense and separately evaluated. (4) Price index calculation example. (i) An example of the calculation of the Price Index Factor based on reported fiscal year 2015 information is illustrated in the following table: Line No. Formula Reference Amount Total Operating Expenses 1 OP $56,906,238 Less: Purchased Water Expenses 2 PWPTR $14,258,442 Purchased Wastewater Expenses 3 PSPTR 20,865,353 Other Pass-through Expenses 4 PT 0 Adjusted Operating Expenses 5=1-2-3-4 $21,782,443 Effective Price Index EPI April 2015 CPI Index 6 245.195 April 2016 CPI Index 7 248.741 Change in CPI Index 8=7-6 3.546 Annual Percent Change 9=8/6 1.44% Additional Required Revenue (Numerator) 10=5*9 $313,667 Actual Applicable Rate Revenues Earned 11 ER $73,291,986 Less: PTR Purchased-Water Pass-Through Rate Revenue 12 I$15,498,307 42 Purchased-Sanitary Sewer Pass-Through Rate 13 22,679,732 Revenue Applicable-Rate Revenue (Denominator) 14=11-12-13 $35,113,974 Price Index Factor before Adjustments 15=10/14 0.89% Adjustments: Department of Environmental Resources 16 DF 8.00% Management Taxes and Tax Equivalents 17 T 0.00% Other Adjustments 18 0 0.00% Adjustment Factor= 1/(1-(D+T+O))=1/0.92 19 1.08696 Price Index Adjustment 20=15*19 PIF 0.97% (ii) Determination of indexed rates. The indexed rates shall be determined based on the price index factor applied uniformly to the applicable rates in effect and shall be rounded to the nearest cent. The determination shall be based on the following formula: IR = (AR)(1 + PIF) Where: IR = The indexed applicable rates that are to be placed in effect in the current fiscal year through application of the price index factor. AR = The applicable rates in effect immediately prior to the application of the price index factor. PIF = The price index factor determined for the calculation period. SECTION 3. REPEALER. All ordinances or parts of ordinances in conflict herewith be and the same are hereby repealed. SECTION 4. SEVERABILITY. If any section, subsection, clause or provision of this Ordinance is held invalid, the remainder shall not be affected by such invalidity. SECTION 5. CODIFICATION. It is the intention of the Mayor and City Commission of the City of Miami Beach, and it is hereby ordained that the provisions of this ordinance shall become and be made a part of the Miami Beach City Code. The sections of this ordinance may be renumbered 43 or relettered to accomplish such intention, and the word "ordinance" may be changed to "section," "article," or other appropriate word. SECTION 6. EFFECTIVE DATE. This Ordinance shall take effect on January 1, 2021, and the revised rates shall be applied to all bills rendered on or after the effective date. PASSED and ADOPTED this ? day of De-c Abe(2020 ATTEST: Dan Gelber, Mayor 1Jl1i Rafael E. Granado, City Clerk Underline denotes additions denotes deletions IHCORP ORATED) (Sponsored byDavid Richardson) '��R • •" ��- APPROVED AS TO � ..2e _ FORM &LANGUAGE k FOR EXECUTION (fl ,v3_ I a ' I -,C) City Attorney q-Licv Date 44 Ordinances - R5 F MIAMI BEACH COMMISSION MEMORANDUM TO: Honorable Mayor and Members of the City Commission FROM: Jimmy L. Morales, City Manager DATE: December 9, 2020 9:35 a.m. Second Reading Public Hearing SUBJECT:AN ORDINANCE OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, AMENDING CHAPTER 110 OF THE CODE OF THE CITY OF MIAMI BEACH ENTITLED "UTILITIES," ARTICLE IV, ENTITLED "FEES, CHARGES, RATES AND BILLING PROCEDURE," BY AMENDING SECTION 110-166 THEREOF, ENTITLED "SCHEDULE OF MONTHLY WATER USER RATES AND TAPPING CHARGES;" BY AMENDING SECTION 110-168 THEREOF, ENTITLED "SCHEDULE OF MONTHLY SANITARY SEWER USER RATES" ARE TO BE AMENDED; AND BY AMENDING SECTION 110-171 THEREOF, ENTITLED "RATE INDEXING," IN ORDER TO ADJUST AND MODIFY HOW WATER AND SANITARY SEWER RATES ARE CALCULATED AND APPLIED; AND FURTHER, AMENDING APPENDIX A OF THE CITY CODE, ENTITLED "FEE SCHEDULE," TO INCREASE THE WATER RATES AND SANITARY SEWER SERVICE CHARGES IMPOSED BY THE CITY PURSUANT TO SECTIONS 110-166, 110-168, 110-171,AND APPENDIX A; PROVIDING FOR CODIFICATION; REPEALER; SEVERABILITY;AND AN EFFECTIVE DATE. RECOMMENDATION The Administration recommends adopting a proposed multi-year schedule of monthly water and sewer rates in order to properly fund the Five-Year Critical Needs Capital Plan and set the Satellite Municipalities sewer rate. The Five-Year Critical Needs plan will reduce the risk of catastrophic sewer system failure, improve the drinking water system pressure, and improve fire protection. There are three options presented and detailed (charts and tables) in the analysis. Option 1: eliminates any increase for 2021, Option 2: eliminates any increase for 2021 and limits the increase for 2022 to 1%, and Option 3: eliminates any increase for years 2021 & 2022. Each option provides the total revenue increase needed over the remaining 5-year term of the plan. The Administration recommends approving the Ordinance, amended in order to reflect percentages to be selected on Second Reading Public Hearing. BACKGROUND/HISTORY The City of Miami Beach owns, operates, and maintains a water and sewer utility. The City's Page 293 of 1707 water and sewer utility does not treat its water and sewer. Instead, it has long established agreements with Miami-Dade County to purchase water and transmit sewage at volume rates. The City has been notified by the Miami Dade County Water and Sewer Department(WAS D) that there will be a $0.1017 increase (3.18%) on the wholesale sanitary sewer rate and a $0.1043 increase (6.17%)on the wholesale water rate beginning October 1, 2020. At its March 18, 2020 meeting, the City Commission made a motion to accept the recommendation of the Finance and Economic Resiliency Committee (FERC)to accept the Five-Year Critical Needs Capital Plan for the City's water and wastewater system, totaling $122.2 million. This approved the use of the $24 million available from bond proceeds and the commencement of a rate study of the water and wastewater utility to determine financial capacity for the water and wastewater work associated with the remaining funding of critical • needs. The Public Works Department engaged GovRates, Inc. to conduct the rate study which is now complete. As mentioned at the May 8, 2020 FERC meeting,the City has been negotiating with the bank to reduce the existing interest on debt by refinancing the Series 2010 Gulf Breeze Water and Sewer Bonds which should reduce the necessary revenue requirements for debt service. As of September 30, 2020, the water and sewer uncollectible account had a balance of $1.6 million representing almost double the amount of the uncollected revenue for the previous fiscal year, which may be indicative of customer difficulty in paying utility bills due to worsened economic conditions. In order to properly fund the Five-Year Critical Needs Capital Plan, the City intended to amend Chapter 110 and Appendix A to codify GovRates' recommendations. GovRates' recommendations recognized the need to adopt a proposed schedule of water and sewer rates for Fiscal Year 2021 through Fiscal Year 2025 in the form of small or incremental rate increases.over time in order to avoid future rate shock and "catch up" rate increases, while maintaining competitive and affordable rates. The original GovRates' recommendations proposed to have the City Commission approve a multi-year schedule of rates designed to increase combined water and sewer revenues by 2.4%, 2.3%, 2.3%, 2.3% and 2.3% for fiscal years 2021 through 2025 respectively, so that the rates could be approved once and implemented each year in accordance with the fee schedule. The recommendations were also to pass-through future WASD wholesale water and sewer rate increases beyond Fiscal Year 2021 as allowable per the City Code of Ordinances. Additionally, the recommendations were inclusive of the Congressional Budget Office CPI Projections that are authorized by existing rate ordinance. During the October 23, 2020 meeting of the Finance and Economic Resiliency Committee, the Committee made a motion to proceed with the recommendations made by GovRates and to bring it to the full Commission for approval. The suggested Ordinance amendments are attached. At its November 18, 2020 meeting of the City Commission, the City Clerk read the title of the Ordinance into the record and pulled the item for discussion. Public Works Director, Roy Coley introduced the item and began a presentation detailing the water and sewer rates genesis, Page 294 of 1707 purpose and vision. At the completion of the presentation, a recommendation and request was made by the Administration to approve the item on First Reading, and to proceed with a second reading Public Hearing on December 9, 2020 of the proposed scheduled water and sewer rates for FY 2021-2025. Commission members continued the discussion, stating they would be amenable to consider, between first and second reading, utilizing additional available funding sources in order to offset the proposed water and sewer rate increase. A motion was made to move the item for Second Reading Public Hearing. ANALYSIS In order to limit changes to the utility's rate structure and provide stable water and sewer rates through the end of the calendar year, the utility rate structure will remain unchanged until either the beginning of fiscal year 2021, fiscal year 2022 or fiscal year 2023, depending on the option selected, foregoing the typical yearly CPI and County pass-through adjustment at the beginning of this fiscal year. Consistent with the Mayor and Commissioners' willingness to consider, between first and second reading, alternate, means of financing the Five-Year Critical Infrastructure Capital Plan, Commissioner David Richardson, the Ordinance's sponsor requested for the Administration to provide three options to be considered by the Mayor and City Commission. Option 1: to have 0% increase for 2021 and the needed balance evenly divided over the final four years, Option 2: to have 0% increase in 2021, 1°/0 increase in 2022 and the needed balance evenly divided over the final three years, Option 3: to have 0% increase in years 2021 and 2022 and the overall increase divided over the final three years. The option originally proposed and the three alternate options are presented below: Originally Proposed: 'Summary of Proposed _+Water �and �Sewer Revenue Adjustments and Rate Design , Rle neendtreW4.al w Sewer Desieff;, ..._",. .,.... ectil&sfed CPI To Waterand d O'1 " • AtAjusf n►eslt Sewer SAW Adjustment ` . - %A3readfl Average Sm Amtitts Per. 141214.1 Y 1. Omerat Mmady inoaal IOW 1 Approval Adjasmaent 700lO0allonsot Per „.101:404:1 - nfer±t_. Existing 5108.69 2021 0.0% 2.4% 2,4%[21 112.98 50.00 54.29 12113) 54.29(21[3] 2022 0.9% 1.4% 2.3% 115.84 1.01 1.85(31 2.86(3) 2023 0.9% 1.4% 2.3% 119.04 1.00 2.20(3) 3.20(3) 2024 0.9% 1.5% 2.3% 122.37 0.94 2.39 131 3.33 131 2025 0.8% 1.5% 2.3% 125 B7 0.90 2.60 131 3.50 13) SFR•Single Family Residential (1] to addition tathe percentages and amounts shown,it is recommended that the City continue to pass-through future wholesale rate adjustments from Miami-Dade County as already allowed per the City Code. [2] Reflects increases in costs from Miami-Dade County for Fiscal Year 2021 (3] Reflects proposed rate structure changes. Option 1: Page 295 of 1707 Defer Rate Adjustments in Fiscal Year 2021;Across-the-Board Adjustments Combined Water and Sewer Revenue Atstments Rate Design Estimated(P1 Total Water and Estimated CW Adjustment Sewer NI for. Adjustment %Already Average SIR Amount Approved Per Additional Total Customer at Already . Additional Total Oscar Rate Approval Aditnitinent . 41300€allons at AppwvedPer AOustmertt. 'ff" ay Ues edl_ .a �j'I ::_ :Ileoitthtyiltse .Rate# arfa ...s .ar. - Qacs Existing 5108.69 2021 0.0% 0.0% 0.0% 108.69 50.00 50.00 50.00 2022 0.9% 2-0% 2.9% 111.42 1.01 1.72 2.73 2023 0.9% 2.1% 3.0% 114.37 1.00 1-95 2.95 2024 0,9% 21% 3.0% 117.34 0.94 2.03 2.97 2025 0.8% 2.2% 3.0% 120.41 0.90 2 17 3.07 SFR=Single Family Residential l•) In addition to the percentages and amounts shownn,it is recommended that the City continue to pass-through future wholesale rate adjustments from Miami Dade County as already allowed per the City Code. Option 2: Defer Rate Adjustments in Fiscal Year 2021;1%Adjustments in Fiscal Year 2022,and Balance in Fiscal Years 2023 to 2025;Across-the-Board Adjustments rtbateielki*keran&Srwer - Rt�rexu Ad"pistnreit: Rate Design , . . EstOttaaecl CPf . . ., to&Wei&and C 1ated'i** •F Adiinineo Sewer v 1 r Adji nt, . %R early' . Avera SFR Amount' Approved Par Additional Total Urmotrter at Already. Additional Total° • Fiscal Rate Approval Adjustment . 71000( ons.of ,AppnnvedPer Approval Adjustment. .Year Orme - - .Pt e. Ilse Rate,(in ons nested" , itzikamt_';.,: Existing 5108.69 2021 0.0% 0.0% 0.0% 108.69 50.00 50.00 50.00 2022 0.9% 0.1% 1.0% 109.85 1.01 0.15 1.16 2023 0.9% 2.7% 3.6% 113.27 1.00 2.42 3A2 2024 0.9% 2.7% 3.6% 116.86 0.94 2.65 3.59 2025 0.8% 2.9% 3.7% 120.69 0.90 2 93 3.83 SFR=Single Family Residential (+( In addition to the percentages and amounts shown,it is recommended that the City continue to pass-through future wholesale rate adjustments from Miami-Dade County as already allowed per the City Code. Option 3: Page 296 of 1707 Defer Rate Adjustments in Fiscal Years 2021 and 2022;Across-the-Board Adjustments Combined Water and Sewer Revenue Adjustments Rate Design Estimated CM Total Water and Estimated CM Adjustment Sewer Ria for Mite:mem %Already AveraeeSFR Amain Apprar d Per Additional Total Customer at Already Admitiawl Total Fiscal Rate Approval- Adjustment 740006aRonsof App:Awed_Per Approval; Adjurer Year Ordnance _ .. Use A Urdn ate - - Anuiunt___ Existing $108.69 2021 0.0% 0.0% 0.0% 108.69 $0.00 $0.00 $0.00 2022 0.9% 10,9%l 0.0% 108.69 1 01 (1:01) 0.00 2023 0.9% 3.0% 3.9% 112.44 1.00 2.75 3.75 2024 0.9% 3.1% 4.0% 116.30 0.94 2.92 3.86 2025 0.8% 3.2% 4.0% 120.41 0.90 • 3.21 4.11 SFR=Single Family Residential (•j In addition to the percentages isnd amounts shown,it is recommended that the City Continue to passthrough future wholesale rate adjustments from Miami-Dade County as already allowed per the City Code. Should the proposed five year water and sewer rate increase not be adopted, the rates will be increased annually based on CPI and County pass-through in accordance with current City Code. Additionally, wholesale sewer rates will be right-sized in order to accurately capture the cost of transmission, allowed per the contracts with Satellite Municipalities. As seen in the table below, the wet season and dry season wholesale sewer rates for Town of Surfside, Bay Harbor Islands, and Village of Bal Harbour will be increased by 3.6% in Fiscal Year 2021. Pro . osed Fiscal Year 2021 Satellite Munici. alit Sewer Rates Fiscal Year Effective Date Wet Season Dry Season Existing Per 1,000 Gallons $3.9519 $3.1006 Proposed Per 1,000 Gallons ASAP $4.0935 $3.2129 Cha nge - % 3.6% 3.6% The rate increases, which will be implemented annually through Fiscal Year 2025, are anticipated to fully fund the Five-Year Critical Needs Capital Plan for the City's water and wastewater system - totaling approximately $122.2 million - while maintaining debt service coverage and cash reserves at levels sufficient to maintain the system's creditworthiness. The United States Environmental Protection Agency's (EPA) standard for affordability for water and sewer service is 4.5%. The median household income for Miami Beach per census.gov is $53,348. A water and sewer bill of $122.98 in Fiscal Year 2021 for 7,000 gallons of usage would be 2.54%of median household income,which is well below 4.5%. Water and sewer utilities are highly regulated, and the regulatory bodies have the power to impose fines and consent orders if a local government does not take good care of its utility infrastructure. Fines are often imposed if the infrastructure fails and causes pollution, or if the Page 297 of 1707 utility fails to meet regulatory requirements. The attached articles and consent order communicate what Miami-Dade County had to deal with back in 2013. The County agreed to pay a civil fine of $978.100 and $825,000 to hire an outside monitor to oversee the consent decree's implementation. The chart below shows how the City of Miami Beach's water and sewer rates compare to many other South Florida communities based on a single-family residence using 7,000 gallons. The current rates for the City of Miami Beach are depicted in "green" .Additionally, it is worth noting for comparison purposes each of the communities listed with an (*) is considering rate revisions. S160.00 Water Marti Beads Water 5140.00 Server 3 ktiarti Beads Sevres 11/ S120.00 - S108.69 S100.00 r.._.__... .. ..... ... . ..... ... .......... _...._....__._........ EE1iiiIiIiiii [iIIiiIII1IFI . --- ti .. r S20.00 4, .. ._.. .. __.. ..... -'- -'- --- ...... ._.. .... a<>"4•1 <>0<>6<\<Nv C1� CC t t �C ° C1 C\°4<S<SC1<Se<S4 lQp c �'� 0 ttPtsifie `��' a dpe Q#4' aiFd e04% ear 4� `,0 'n•ce,tal. mac4Pe rQ4e .40� 10 #43.40491 a va � tr,G ao otpe QS 6640 .tch a. c,c..tataec,i6 G GdRG't� The funding plan assumes: i) the use of the remaining proceeds from the Series 2017 Bonds; ii) the issuance of additional bonds in 2022 to finance approximately$50.2 million of projects; and iii) the refunding of the outstanding Series 2010 Bonds. The refunding of the existing bonds would provide additional cash flow to fund a portion of the critical capital needs on a pay-as-you-go basis (balanced debt risk). It is estimated that the debt service savings from refinancing the Series 2010 Bonds using a bank loan or additional bonds, would be approximately$16.5 million through Fiscal Year 2030 (an approximate net present value of$12 Page 298 of 1707 million). These numbers are estimated using today's current market conditions and can vary depending on credit availability and general market conditions at the time of the bond issuance or securing the bank loan. Additional information is provided in the chart below. ('rilical Capital Heads Find*Tirestgb Fiscal Yur 2024(SI 22.2 M)ri Pn-,a-Vac-(..F'uwuoR (S23.7 NI) 41.1% S.40.2M Remising Prov,ds Iron Series 2017 Roads(5183 AQ Proceeds Inn Issuaoer of S413 M Additional Booth IA 2922 [*] The refunding of the existing Series 2010 Bonds would provide additional cash flow to fund on a pay-as-you-go basis a portion of the critical capital needs recognized through the Fiscal Year 2024 as well as critical capital needs identified beyond Fiscal Year 2024. Based on preliminary numbers provided by the City's Financial Advisor, debt service savings could potentially total about$16.5 million through the Fiscal Year 2030. These proposed rate increases reflect the funding of the projects identified in the Five-Year Critical Needs Capital Plan, as adopted by the City Commission. Additional increases may be required if water and sewer improvements are constructed as part of the Jacobs Engineering neighborhood prioritization. At first reading on November 18, 2020, the City Commission requested that the Administration bring back additional information regarding potential funding from the Miami-Dade County I nteriocal Agreement Fund (ILA) that could potentially offset a portion or all of the proposed rate increases related to the $50 million in planned new bonds for critical water& sewer system capital projects. The amended and restated I nterlocal Cooperation Agreement with Miami-Dade County (Miami-Dade ILA) approved on November 19, 2014 (Resolution #2014-28836) authorized a modification to the payments from the County to the City of funds that were restricted for capital projects within the former South Pointe Redevelopment Agency geographic area. The amended agreement removed restrictions on the City's use of these funds, thus allowing the City to use the funding for sea level rise mitigation or other projects in the City. Although the language in the Agreement does not limit the City to only use the funds to address sea-level rise and flooding issues on a citywide basis. it was the intent of driving the change to the Interlocal Agreement. For example, the Memorandum of Understanding between the City and the County specifically mentions that the change to the ILA "would be especially important in helping the City address stormwater, climate change, and sea-level rise issues." The City Commission subsequently earmarked the Miami-Dade ILA fund for stormwater capital projects to offset the need for an additional stormwater rate increase needed for the third $100 million in planned capital projects. The Official Statement and Financial Feasibility Report developed for the 2017 Stormwater Bonds (the second $100 million) included an anticipated $103 million from this funding source (actual amounts to be received are dependent Page 299 of 1707 on growth in property values). The Engineer's Report developed by AECOM for the 2017 Stormwater Bonds estimated the total cost of the Stormwater program at $658.9 million. The. planned use of the Miami-Dade ILA funds to pay for the next tranche of Stormwater projects in lieu of a rate increase was most recently discussed on January 27, 2020 at the City Commission's Resiliency Workshop. Since the Miami-Dade ILA was amended and restated in 2014, this funding source (funds 320 and 433) has generated $68 million, of which $5.7 million has been spent, $24.2 million is committed, and $38.0 million is uncommitted. Between now and the last payment in 2022, the City currently estimates receiving an additional $35 million (actual amounts to be received are dependent on growth in property values). The uncommitted amount and the pending payments from the County total approximately$73 million. The language in the Miami-Dade ILA allows the City to use the funding for sea level rise mitigation or other projects in the City. However, because the anticipated need for funding for the Stormwater program is estimated at over $600 million and the City's stormwater rate is already the third highest in the state (see table below), the City Commission earmarked these funds to lessen the need to increase the stormwater rate for the next tranche of stormwater capital projects. Stormwater Rate Comparison Stormwater Fee Town of Golden Beach $50.00 Village of Key Biscayne $26.00 Existing Miami Beach Rate $25.32 City of Fort Lauderdale $21.52 City of Lauderhill $19.03 City of Coral Gables $16.16 City of Tamarac $10.15 Village of Pinecrest $10.00 City of Sunrise $8.87 City of Margate $8.66 City of Miramar $8.50 City of Wilton Manors $6.15 City of Hollywood $6.12 City of Opa Locka $6.00 Miami-Dade County $5.00 City of North Miami Beach $4.60 City of Sunny Isles Beach $4.48 City of Coconut Creek $3.95 City of Aventura $3.50 City of Miami $3.50 City of Homestead $3.37 City of Cooper City $3.22 Page 300 of 1707 If the Miami-Dade I LA fund is used to offset all or a portion of the proposed Water & Sewer rate increase, the likely result would be a need for a sooner than anticipated increase to the stormwater rate to cover the next tranche of necessary upcoming capital projects. Administration does not recommend the use of Miami-Dade ILA funds for this purpose given that (1) there is a clear funding need for several hundred million of anticipated stormwater capital projects in the near term. (2) the Miami Beach stormwater rate is already the third highest in the state, and (3) the stormwater rate is allocated on a flat ERU basis instead of a demand model like the Water& Sewer rate. Results from the 2019 Resident Survey show that 69% of residents were satisfied with the City's stormwater and drainage improvements. In order to continue maintaining excellent standards in this area, the City is considering a proposed multi-year schedule of monthly water and sewer rates in order to properly fund the Five-Year Critical Needs Capital Plan and set the Satellite Municipalities sewer rate. CONCLUSION The Administration recommends adopting a proposed multi-year schedule of monthly water and sewer rates in order to properly fund the Five-Year Critical Needs Capital Plan and set the Satellite Municipalities sewer rate. The Five-Year Critical Needs plan will reduce the risk of catastrophic sewer system failure, improve the drinking water system pressure, and improve fire protection. There are three options presented and detailed (charts and tables) in the analysis. Option 1: eliminates any increase for 2021, Option 2: eliminates any increase for 2021 and limits the increase for 2022 to 1%, and Option 3: eliminates any increase for years 2021 & 2022. Each option provides the total revenue increase needed over the remaining 5-year term of the plan. The Administration recommends approving the Ordinance, amended in order to reflect percentages to be selected on Second Reading Public Hearing. Applicable Area South Beach Is this a"Residents Right Does this item utilize G.O. to Know" item, pursuant to Bond Funds? City Code Section 2-14? Yes No Legislative Tracking Public Works Sponsor Commissioner David Richardson ATTACHMENTS: Description D City_Commission_Minutes_March_18 2020 (2) Page 301 of 1707 ❑ Miami_Beach_Water_Sewer_Rate_Study_Report_10_19_2020 (5) D February_28_2020_FERC_MEMO (2) ❑ FERC_Minutes_2020_2_28_Meeting (2) o 2020-31211 Reso ❑ 2014-28830 Reso o 1 rst Reading Ordinance ❑ November 18. 2020 City Commission afteraction ❑ Miami_Dade Consent Order ❑ Miami_Dade Articles_May 23 2013 • Page 302 of 1707 After Action March 18, 2020 City of Miami Beach Commission Meeting / Presentation &Awards C7 V A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ACCEPTING THE RECOMMENDATION OF THE FINANCE AND ECONOMIC RESILIENCY COMMITTEE AT ITS FEBRUARY 28, 2020 MEETING, TO ACCEPT THE FIVE- YEAR CRITICAL NEEDS CAPITAL PLAN FOR THE CITY'S WATER AND WASTEWATER SYSTEM,TO APPROVE THE USE OF THE$24 MILLION AVAILABLE FROM BOND PROCEEDS, AND TO COMMENCE A RATE STUDY OF THE WATER AND WASTEWATER UTILITY TO DETERMINE FINANCIAL CAPACITY FOR THE WATER AND WASTEWATER WORK ASSOCIATED WITH THE JACOBS ENGINEERING NEIGHBORHOOD PRIORITIZATION AND THE REMAINING $61 MILLION DOLLARS OF CRITICAL NEEDS. Public Works Sponsored by Commissioner Mark Samuelian ACTION: Resolution 2020-31211 adopted. Roy Coley to handle. C7 W A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ACCEPTING THE RECOMMENDATION OF THE CITY MANAGER, PURSUANT TO INVITATION TO BID (ITB) 2020-005-AY, TO ESTABLISH A POOL OF SUPPLIERS FOR THE PURCHASE OF PIPES AND FITTINGS TO EXPEDITE THE SELECTION OF VENDORS FOR FUTURE PROJECTS,AND TO APPROVE THE INITIAL POOL OF QUALIFIED SUPPLIERS;AND AUTHORIZING THE CITY MANAGER TO KEEP THE ITB OPEN FOR THE PURPOSE OF PREQUALIFYING ADDITIONAL SUPPLIERS,AND DELEGATING TO THE CITY MANAGER THE AUTHORITY TO ADD SUPPLIERS TO THE POOL, PROVIDED SUCH VENDORS MEET THE REQUIREMENTS OF THE ITB;AND FURTHER PROVIDING THAT ANY PURCHASE IN EXCESS OF $100,000 PURSUANT TO THE ITB SHALL BE SUBJECT TO THE PRIOR APPROVAL OF THE CITY COMMISSION. Public Works/Procurement ACTION: Resolution 2020-31212 adopted. Roy Coley and Alex Denis to handle. C7 X A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ACCEPTING THE RECOMMENDATION OF THE FINANCE AND ECONOMIC RESILIENCY COMMITTEE AT ITS FEBRUARY 28, 2020 MEETING FOR PRELIMINARY APPROVAL OF A JAZZ FESTIVAL EVENT CONCEPT, SUBJECT TO THE EVENT ORGANIZER'S SUBMISSION, AND THE ADMINISTRATION'S REVIEW OF A PROPOSAL FOR A SPONSORSHIP PACKAGE AND EVENT DETAILS, WHICH TERMS SHALL INCLUDE A NON- REFUNDABLE DEPOSIT IN FAVOR OF THE CITY, AND WITH THE FINAL NEGOTIATED TERMS SUBJECT TO PRIOR APPROVAL OF THE CITY COMMISSION. Tourism and Culture Mayor Dan Gelber ACTION: Item deferred to the April 22, 2020 Commission Agenda. Lilia Cardillo to place on the Commission Agenda, if received. Heather Shaw to handle. Page 27 of 56 Page 303 of'1707 CITY OF MIAMI BEACH, FLORIDA WATER RATE STUDY . _.., . ...... , •v.EWItt,.;.7.....64...4.......t..a:•.A.ihit... 'e 6/-1 ' ,.! '' ••- " . . , :ift, -,!:, ,... •,-.. _ . . 4 _ .r.,rc,- .777,..----m.-... , _ - ...,.., : i.-. ''' •--'-`-**fti• , • • . -• , • ,..,.• :4- ._......._-mr..-7,...—• . ,,_ • .!;-../t'4•L"' ' ...- .„ ..-,7- ' - •:' -- • ,....-.'.1.... ..%' - • I- ' 1/4. ....• :",..3--,7„,-...7t o• .-" ._,,.....-_:',;L::::,:•,'7;,.....,:i. .,;:...-.1.1 .,74.c.,.: . .,- -- -.* '-''-',',:It;t:.,,.7,,;V.:,, .r . ,._ . - •."!..11C'A.''''k!' ., __. — -- . • - . . _ . 13..IF •-•-• -.7• . _. -. ''' ..E •• .i i' , . ..--,. .. Y., IN4-411.- -1i-.1‘..,0%. -v'. -. .. • - • . . , '" • .,I•S t.1- . 1,,t.z 1.. ... . "— ' . _ L.,!JS.r4 •V''''.•''' • '''''""ei'-.V' Ir• - "- - - /''-r" ov-lk•-.-C•--- •::- .,••:•••••,.-1•01-•- •. v-• • • • • •• •-• . •• r.-,2 ,.•• ''•.- '. .•' •7-'...7'"I 4',...:-77:77" ---•.-----r-:`..: ! t- .-•-•.•.t..:--',..7...."b4.4'"'•"- ' ,, ..'...,-*-' " -' ' l'' Vr* .-..'t.:. . '7. Ai. • 771*. • 4....,#,. -‘ .,..-c..,-- ,",-;"._... -.... ., . .- .- ' 1,e,..f,'.....I, ,___...... ....... ...6..,•• ....imi.,,.«, iiiiiiimili jaaalt._f.w!'... '.'"'"----- ' •- 'cf.g;?;',.. ' ' -,' ° e.::"'e,'C''-',T,,-.'_.: 6',,Nr-, ,,,. . - -- G ovRate s, Inc. .. ,. : . 2 ,..-,.. ,, A x t, • ''. Utility,Financial,Rate, and Management i Consultants for Governments ._.1UTILITIES _ - -- • - ... . ... . .. . ?age 304 of 1707 .. . •i'i 9 ' GovRates, Inc. Utility,Financial,Rate, and Management Consultants for Governments • r4., t< October 5, 2020 Honorable Mayor and Members of the City Commission City of Miami Beach 1700 Convention Center Drive Miami Beach, Florida 33139 Subject: Water and Sewer Rate Study GovRates, Inc. ("GovRates") has completed our review of the water and sewer rates for the City of Miami Beach (the "City") and has prepared this report which summarizes our analyses, findings, and recommendations. This utility rate study included preparing a financial forecast through the Fiscal Year 2030. Developing a financial and rate plan for the City's water and sewer system (the "System") involved multiple considerations: The financial and rate plan should consider utility best management practices and should promote financial sustainability and creditworthiness. The proposed monthly user rates should be considered equitable, affordable, and corn petitive. The proposed rate plan should not cause "rate shock" to customers. From a best financial management practices standpoint, smaller incremental increases over time can help avoid future rate shock and large "catch up" rate increases. The proposed rates should enable the utility to perform the necessary capital improvements and operational enhancements to remain compliant with the regulatory requirements of the Florida Department of Environmental Protection, the Florida Department of Health, and the Environmental Protection Agency. The proposed user rates should provide the System with an adequate level of revenue stability given the seasonality and cyclicality of water sales and corresponding billable sewer flow. The water user rate structure should encourage conservation of water resources. --GR I u1'2 fi ;4 r c 3yq� t n ..•.;,_. :,�:d" Y � � ._ {" .+ . 3g4. .. .. ��3' .. .. _ 1. , GovRates, Inc. 1988 Varick Way Casselberry,FL 32707-2409 Telephone and Fax: (833) GOV-PLAN GovRates believes that the financial and rate plan presented in this report reflects a reasonable balance of the aforementioned considerations. Following this letter is an executive summary that provides an overview of our analyses and conclusions. The other sections of the report provide additional details regarding the financial forecast and rate development. As noted in the report,the City has an opportunity to refund the Utility's outstanding Series 2009 Bonds to achieve debt service savings of about$16.5 million.The financial forecast presented in this report assumes that the City will move forward with the refunding. We greatly appreciate the opportunity to be of service to the City and would like to thank the City management and staff for their tremendous assistance and cooperation during the course of the water and sewer rate study. Yours in government service, GovRates, Inc. Bryan A. Mantz, CMC, CGFM President - ,..,--GR 2 of 2 CONTENTS Letter of Transmittal EXECUTIVE SUMMARY AND RECOMMENDATIONS: ES-1:General ES-1 ES-2: Financial Targets ES-1 Exhibit ES-1: Revenue Requirement Elements ES-2 ES-3: User Rate Recommendations—Retail ES-2 Exhibit ES-2: Summary of Critical Capital Needs Through the Fiscal Year 2024 ES-3 Exhibit ES-3: Critical Capital Needs Funding Through Fiscal Year 2024 ES-3 Exhibit ES-4: Summary of Proposed Water and Sewer User Rate Revenue Adjustments ES-5 ES-4: User Rate Recommendations—Wholesale Sewer ES-6 Exhibit ES-5: Proposed Fiscal Year 2021 Wholesale Sewer Rates ES-5 ES-5: Financial Overview ES-6 ES-6: Requested City Commission Action ES-7 Tables: Table ES-1: Summary of Existing and Proposed Monthly Water and Sewer User Rates ES-9 Table ES-2: Water and Sewer System Financial Overview ES-18 Table ES-3: Multi-Year Financial Projections ES-25 SECTION 1: FINANCIAL FORECAST 1-1: Introduction 1-1 1-2: Existing Water and Sewer Monthly User Rates 1-1 1-3: Water System Customer Statistics 1-2 Exhibit 1-1: Meter Equivalent Factors 1-3 1-4:Sewer System Customer Statistics 1-3 1-5: Revenues Under Existing Monthly User Rates-Retail 1-3 Exhibit 1-2: Projected Retail Rate Revenues Under Existing Monthly Water and Sewer User Rates 1-4 1-6: Revenue Requirements—Principal Assumptions and Considerations 1-4 Exhibit 1-3: Potential Annual Debt Service Savings If Series 2009 Bonds Are Refunded 1-7 1-7: Summary of Water and Sewer Revenue Requirements 1-9 1-8: Debt Service Coverage and Rate Covenants 1-9 Exhibit 1-4: Projected Net Revenues Debt Service Coverage 1-10 1-9: Projected Sources and Uses of Funds 1-10 Tables: Table 1-1: Summary of Historical and Projected Water and Sewer System Customer Statistics 1-11 Table 1-2: Projected Water and Wastewater User Rate Revenues Under Existing Rates 1-17 Table 1-3: Development of Net Revenue Requirements from User Rates and Projected Revenue Adjustments—Water System 1-21 Page 307 of 1707 coNTENTs (cont. SECTION 1: FINANCIAL FORECAST (cont.) Tables(cont.): Table 1-4: Development of Net Revenue Requirements from User Rates and Projected Revenue Adjustments—Sewer System 1-22 Table 1-5: Projected Net Revenue Requirements—Combined Water and Sewer System 1-23 Table 1-6: Utility Budget and Allocation of Operating Expenses to Individual Systems 1-24 Table 1-7: Projected Operating Expenses—Water System 1-28 Table 1-8: Projected Operating Expenses—Sewer System 1-30 Table 1-9: Projected Combined Water and Sewer Operating Expenses 1-32 Table 1-10: Escalation References 1-35 Table 1-11: Projection of Wholesale Water and Sewer Charges from Miami-Dade County 1-36 Table 1-12: Debt Service Allocation to Individual Systems 1-37 Table 1-13: Estimated Multi-Year Capital Improvement Program and Funding Sources 1-40 Table 1-14: Projected Cash Balances and Interest Earnings By Fund 1-43 Table 1-15: Projected Other Operating Revenues 1-47 Table 1-16: Projected Operating Results and Debt Service Coverage 1-48 Table 1-17: Summary of Projected Sources and Uses of Funds 1-50 SECTION 2: USER RATE DESIGN 2-1: User Rate Design—General 2-1 2-2: Design of Proposed Monthly Water Rates 2-2 Exhibit 2-1: Water System Pass-Through Rate for Fiscal Year 2021 2-2 2-3: Design of Proposed Monthly Sewer Rates 2-2 Exhibit 2-2: Sewer System Pass-Through Rate for Fiscal Year 2021 2-2 2-4: Bill Comparison—Neighboring Utilities 2-3 2-5:Wholesale Sewer Rates 2-4 Exhibit 2-3: Derivation of Satellite Municipalities Wholesale Sewer Rates for Fiscal Year 2021 2-5 Tables and Figures: Table 2-1: Comparison of Typical Monthly Residential Bills for Water Service 2-6 Table 2-2: Comparison of Typical Monthly Residential Bills for Sewer Service 2-8 Table 2-3: Comparison of Typical Monthly Residential Bills for Combined Water and Sewer Service 2-10 Figure 2-1: Comparison of Monthly Charges for Combined Water and Sewer Service for Single Family Residential Customers Using 7,000 Gallons 2-12 Table 2-4: Derivation of Satellite Municipalities Wholesale Sewer Rates for Fiscal Year 2021 2-13 APPENDIX Existing Rate Ordinance Page 308 of 1707 . • • . .,...: • . .. • ,............f., . p • e. , t . - _, . ....,r,•• . ..:' :';''*"..“..!:4'.?:.f.:...... • •:,,,...,:;',:;%tir.1.*'77i•:;.''''''';4--'47.'' '...'--'''''','-i,41-tti'.. . , . . . .'''','*' • -:..........'':,. ': ;..'.,,:'*.4211::::c...,,C.Ii.:6.44-7.. ..4.4tr-''...#`...;040.711.t.t-.,4'..111'..,"4.,7.-.'5,,,;€:,....71...7-,4:•:f..-.,, ,tTiiihi. ' ' ::* ' '''''.:-' •::.' .1:•-':'T 1.4,..!:::..: 1:1''1:4:;'.:i...Y':.. ..i.::4',:w7.,:efl .):1.44.-RefAtt4ER.FW*7'01: :77..' ::.::11.1.''7:.*':'''''''.:....';1:1111:i5Onir,i'ilhVi:;.11'; :1.:'. ..' :''''''--• ' "*'....;.'s,,fi:''''..." 7..,",':i.:;-•'*,.r.ti'..irt44.il.'::.--Altlr'''Cl.'..:',:;',.'b 41.4•41473F4frill-t;t414i-&1%,-,;;;17W:t.E.',...:KJ•.::.'.,......... . . ,..'..''...,...,..'i;,,,l'i. iiP,',T.1; ...:. .% i.i7:..`."..,....,:i.:,".4;.,: iitil,',..'''',.:f:, ''..... ...?,.i:.i41,72. 47.211.1t7.44174.1.7ft-...lUiigi.i,h'.!k,. .. :',...,.';,;'.l. - .• ,... .....:-•7'.;;':*2 .:..:i'•1,'lrift.' ''.% . .. '.... '..; '''''.'.:'.-- .-.4.'„,'Lit4.413. ,;''''0)g.4;frilrA"r7.:P::-_,.-..Z. T?:,,i.::4;§:iti'''.4%...Ff:1141:lial,42.4*.illitZllifilETRIR.,!..7.:i?.?;:f.W:j.fY; .''... ..' ' ...- . :.••,...,. ....t.T:'' '',]',:1:;...:'.::.i:'. . • . .•.;.,,,.'. c.:', • ...P.,,,..,,,..-.;'....,•;...,.......IV4„1„,#..tr.,..,..',-,7.'W;i-.Vjr'::..,..,..:t7....1i,:ie.1...71....,::q0,,Ti"7....,',.;,..,..t.'-7if'..:..i,ii'7.-.',4“,.,E4,M,...Z.-2f5ii-tikili:nrtiiii,. ,..ti,,TE,i'.7. ,:i,....;':.:........ .'.. .• -'....... '.... :,......,.' * ..: : ' . ....• ;*!*li•. ...'.....'*!'•••:*,,,J,:?2:3,:.V.,:e..4"..'17.'11'''s.7..4.jraTF......‘', -f.'''''...:•....::::,1:i'jj',,;f:W?'-',77:::',.::,.';:,'......."•:••'.'.i....,ir.:".;',..j.1;4•7.4ii4iIiiilliTeffniiiiitHNiii*.ffi. :17-'4i'.1N.:i.l'. :..:',',:,.. . ' : ,..;'‘.7'- :. - ''''.;-,:;,''?:„_r•rt,:.',:..iii.."gif.;;;,-;':,,,,,,,1:a''`4.2„,„*.-1;*:;47- ...'.itZji:-4,11171:--1.!4it,Tilitill411.,...`a.:;.-' ..:.-:.il'":.".:-.::'..-'''''....'...f.;:1-f;:i'i:l'iiiiii':iiliP',I.i1iMPAIEV-..ii,laritlijiiear::'1i?....';'q:.:::.•1: . :,1:1-;;:.-..';.:,....•;:...7,t;..'-,'";:jUj1>'''..7,;1-1!'i:,;:l.4.74,';',1*.,ii.74.r.!..le.i'..!;IVIV.-;:::"..„'-1.41-i•ViAi.i.;-1,-4',411.1V.Htfilia.411;T:i..--.5: ::,-.!.:'.;',1 :: :,...:.•.:.....1-3i:•-:-:: I....,,.•,-,...,,::::;:irTitiiiiiiNlii.l.:1AF,F.1:f:i',:Fliiinnlj.y: ',1::::'.:.-. • . . •-...., -'''''''''',4,'5;14-7,'''414'1' t'*-2'h•• • r1P,S11,-- -...',-'t-tqg i','L`i.'-',-Iii4fr:.1k411.'...i2r-41P4,,,,.ii4, 2i,',-_'''''-`:r.,j1.17-1,1.ii;-?.!:,. .".,,:,..'..":i%,.!.-1:-•,: - ...,',...::,:17,,-,:.!,---,::;::::..-7.,,,;1;:.,,j4---...............................' .' !.2.1.e0,-,',i,''','",:!.!:--1-4,-JA;; :.•--1.',... ",.''.4.9it'ig.,;i't'iM',...T.;1'1.1'}'';'744 .--TeitIgilqi-Ktlikiiii411I.R'1/21"''''''''''''11-1-''1'11'''.1'.''• '-'' '•".„: . - '' '1''' ''..''"•'•••'-'..1'''''''''''--.'''''. . ' '...,.;,...i.%X..-19-1r4:'''''''''..,-"Nr4t'. 4:4i-ifjP.-Ti.flfq-Si.1-:.-i'e;;',.'...2::..f!.e;i'sMiitii',FY.i,ii-A1117,iiitelilIglik,'Ili.91 .iirAii.: :• ...,:,...:,"...- - - '. . ':.., .......:.-,1,::•;1,1..,:,. .25 .11.-,;1;:.:pi,- •,• 11' .' ,,,---'11....,-.... ,----'4,-.4,„*,•--.••,,,P.-1-114t4i&_,Ag.,,,,,,,,-17,4X.Y.',"t'i,::'...Y-..h.,',:s1;-:.;:':'..:!4,i'ie.,QIi.itirj,..i.f•VIRi;gFafirge;,d'iiiHiQM14cli?n,!! &*.•‘'.• itiK5E"r•-‘'r5V-11M91'1,-;',1--li'Gr"*', N,'.'..:1.-..'-...:;,,..:....'......;::::'.....;'.41-..]:1,f7.47...ii-i,1,1'.1::1];Z:ht',7!:Ti4giii'.4P-A-,.-nsiiEN.:i•aili!F.,. :.:..1,-1::,,Ir,-•:..:....:. ---"'-grail.,Futlai..11--.,'•:;'.;:..,,,i '..:4.-i,..-Z.':',f." ili',1,-•1-1-- . " -,f',',.L'1,:i,:,iiiriiiiKli-Tiggi. i,-,.-.Eiigli;:: :;;;;.,...,-... .'....., ... , .... ;,:,,,Zta-rii7.42t.Ni-%!alln•jti::-..:•-..",.1,Ni4.--.•,-;.' 1,1,.,:::.••-•:... ,.'''.'',.-.•: ','.1'1.'f'.i1i,.'.!'.4,:'.!:14,.,:ril.,r-:*:9'...4.1P!!!.:IiiIi4r:i1:!1'i12.1'.ii•. ',1" : 1 ,'.:Z,Ii,E'4:',,,t-i!i;"!r!..-4!lili:,.11!,,1-;:,..,,i:..'.'',..-.1'. .1..• ' . ..:......'...:::..1:1:!-1.1,"- '','1'.'",..-.,'1.,' '.11,,.-.-- - • . . . . ..... .:• :.. .„..,.;,,,,........ . . --`1--...............,....,„..,.... . • - .,.....„.,:„.......,,,...,..... , . . • ... .. ... . ,4,1.4-ei:4..t14:;i4'-'•P'.:'.'1 ':' 1.'. '?4;1..;:ir-.', )- 1.":.!.."1'.;!::,•'' ,'• - .1'.1,,• • EXECUTIVE SUMMARY ATIONS mmEND • RE AND • • • • RECOMMENDATIONS .• • . .... . . . .. . • . . ... i• • . .. . • • , . . • . .. .. .......,• • . .. • . . . . . .„... ...... ••• • . . . . . •......:....,H::,....,:, .. . , ....:: ., . .. ., :.• ......,, . . . • . . . . . •• :,,... .. . .. . . :::. . ....• ,. . . . ..:•. •,...: .. .::••••.•• •.. • . .. . .. :. . " ..:, .. ..,..... ..........„. . ...„ :.... . .•• •, •:.„. :„........,......•,...... . . . . ., ........,,.....,............,.,..„.,...:„:„..„,,:,,,•:....•.,.....„..„..,..,..„:,..„„...„.„..,....,.„,:„.„...,:..,.*:....:1-:;•:.F•t7,1• Ft,ri-w -i:7. • .... ..••::•.,i:•••• :L ': . - . . ..,:..,•••••••••••••:•:::,:::-:r..,,.;:i,:•:,.::•::',.:.::-..1-,,:......,•-•••!: .-,•-•.;,,,, 1,.:...., ;-..., •:•::::•:,i'..,:tf •••;-•::-.:•: ,..-;•••',..,•;:•,:;:,,,i;"_-, -27.2,.":!•,;:4Ni.'2•M•-si.‘,- -,9„:...-!..,,,, k,-•7,,,71,,c..•.•,,,,,r-kk_r_:17„,,..,:f....:41;•., . , ••. •.,,,.':,'• ::.,..:•.,..1,..;,...:,•- •,:,,,•:,;,:it:-..:',, _-.7,,, t.f:•,• ::,.i.:::•i-_,...• .,....:••„:„?...,4.:.:r..;!'.ii,,'„,,-,:,,zt--4•,-::;;;.2.,"-, ok,.y,:ligg,A-ti•:- -,..','•.'-!!!-.-4,4.-..Z•140,,V:,•;;q11;y•,,,•,•,31'04 F:::45,-;,,r.?...41:414.. •,--i•:--...••.: ::,•' .. -. ..'••. . ...:;.'..-1....,•-••-•:.:':•, .:::,:-pi-... ,:-.._:•.i-1,•:',''.7r.fel-r;:;•••••:it',•,1-!2:,.:,•••1.,.,,,.:t;;:ii.1‘.:',•,--ii!4;14kif:'',,.-F;r•7,1344fg•I,-Iki•Fiftcti:4 --:-.;;•.ii--f-t...,,iciq,-,,..,.,-.:,,t,,:.e4.47',-..7-,•4--1?..1.-4,f.,,,m;•:k;,- ,,Y'4.ii..-91,f1-; ..,: :::.•:,.;';...,I,.:' • . .•.•• .. • . •*-:'•.--,,....- ',;7..,''-'•,:;•.•-,; :7:;:••••,•,,,-:!•••4..,•:,,,,,-.. .,_-,,,..,,,:::,,,,,,,...i,,-1.:,,,ii?.,...(.544,!•;7.17,,,.. 4-freL.:-...7,-iA.7,2.,71.47:•-•ph.viith7;.',':-. .-7.:;i5.1.-osi,,,,-...-7T-4.-tik‘'.'.'eps;:-:,..44•1:•••••-"A-E•ggi.,..',.t,-fivf,.. :•:.';•:•;::4'-,::::••••:%''l:::,•::,....t".f:-.. 1.,-•:;.-.:•••••'•:-:-.,.:i:•,•••:.5.'AV-*•••:•1,,---:• .;,,E:"....1.',i,tt,',:ifi-,:,'5.?•'!':.,,-,1.7W,t,9?-4t4i,..74Zfi..11744.,;-Y;r11,:: FT,:"4Fe-:,'•.4;,,,A,1.2.-4g*lk,.:YN _,,'"%', .Ii,',. F-p.t••:''.:,Mil..f-•;4*'/:'llf•-t.i..:T,'-'''.'i•':;51';:q.:;11.r•-F5:,'. ..•:i','''''-,;;,:';;;i';.i!, -,:.::;:.i.,.1.,i''':•:...::::::::-:;....••:;'-•';'f.,--t...4;-:.--;:-..i.irV.:!:::: :ii'fz.-'::-'H'1:, il'-'::'1::'.:14.it: A -••••'':.:--il-i,:77:•:17 '-'.A •';:+:l':41:!i•f:474.tiFeNn.31.hili.,:r;;:127A4:1z.L4k4"; ;Wk•S•litt's:'.'?;::fil::',4:::•!:..,•1:-:,!,.;:::,..1•,--,'..--:: :11 .1'1Li,7,:::!..j•...:e,',?:...:Itit. 7.,,,..,:i:a"...1,..,::•:7•:•gl:zzi-,,,i-",,-.-:;:-.z.V;.,,:zit .,-,2-4.r.:,---. 1,,„11-,_._ •4.7..t..-...;:,• ,,N-_,...,..._.-1.=,-,',...1,..',1E,47.''-F 0:1171,'-4.,..i-,.,--:.+Yr.1,-Fg."...:Kii^,''.1,..-1,7A,,',14,,.1-..,;;,- ,,,,,,.:- ,...,.., --;,...;f•. ,... ,-...,:l.,--,,,;-2.,7:::* .,rn., ,,... .qn•.i,,V"', ati.'-“=-A1.41.-7-..t',---.4-.... • .,,,...„...?.*„..,„:„_;,,„,,,,:_,_,...„_,,,,,,,„,,,,•.,,,,.,,,,-„..,..,.,,,-„,,,,„,,....,,,„;„,„„,,,-„, ..„,:•,,,,-„-• .-. _ _,,....„-.-.:,..,--,,:._•.,,,.„.„:-......„,:.,-,-„,...„,,,..‘. .,.: ,,,,,,,,•„,„.,,..„„.,,..,„„,„„,„ ., . ,•,,..--.:-;-„•..:..Tf-jtifir...,-,..,..D1.--t•.r;-..!'.7;tig-%.,'7,-!trit'V.:•knii!.E. --',441;i1:1r.r.-'",,.;;';`,..,::,:j'44';':;.;?2,-!:'1'4f.11;4.4.4...1.i'1:•-•, , :-111..*.-'4-'1.:'•;;I:.?..-'..'';',1'1';'..P',.1',1-1' .L'',"-.' ....:,...4 ,. ,-riff'n -. T-•.':'.:-.•. ;.• z"7 ,'.':''''''. '1,.; ,6:-9,:ii";:-..•,-,::-,,.1-12..., ,:,•11,,,,,,E li'•--,-,:„.. ..:,•,,,...,`",4:..,7..07“,--a.-.:,f,T.:,..;:j41,,,•,,,,,,,,,,,:e.iynnfril4N,...:,t?„-;F-7-:.`.-:.'>''A.:-. r., .r.•'1-.;;_,', ",.•„:-''. -:-..!,.,,,i,l'i.u,t•.1,t.f:71;%iyi.•74::•,/k,14,,,---1,..',.,';A ' ,..i.',:g••r.°•-7," ',::,Y, ,•,' !...'.,...: •-:• ..,...,,..:, :, F.,::,...'.?7,•1-,--fri4-n:1:-..1t,r„.,-ki;M:,ti•.?::-„i•,.,Vi,:1,.:71T:.',3F-;:,,'or4i*:?.- •.':":.i'5.,:'",.:':-.ti-In;,',A,---.,••,-?-:41,%-1.,:::-•',,,,,-,„ , .,.„. :- •.'F..i,,•,..:,:.:R:i2.;•. :-.,•'.1. •••-, i .,4t,:t.t.,451,T,I4.,•;,,;', '''''.',...,..."• . ' ' ' %,--' '..:•, -: •;,,• ,I„,:•*•-•- ,...P.-,--'ivi';:f.;P:A . -:',frq...;•iati.:.,,t".;:p4i:).!'.4'1•Y.'-.''''-7-::. -f,',!'-i.:::"'*.' ,.,.:;!:'ICk.1.... 7•T:?,'1•.•':.'"%:::•-::',A,:.:.:.'.il.'2:4•,':i°7!:2.1.•':•'!:"'-.-1-.7.,',;•F':::•:,'.. -;''.N-•.5.,,,Y‘,,::'4:;',;j'g,,,rirzz:':'":il,,',!-. .' •-• .• • _:,;:,.,:',',,',.,:,-,•.i.„:.;:`,1'.' ''- ';':-".-::',-I'''''-t..17.1''.;-.711J:gid:'4•Eift.-5.7;i'V:. . .';'?Z;•1;1 '1-.:.-17..r'...1',;.., i.Y.:.-':;%.3.r....,,I.T.'%1;:7-`''`11C,:i-,:•.,'‘'':::;:.?';'W'-'-'.1-'';'1':".7;:-,':.:'...!::„.;-,;-;:•1;''.'-'1-?' -•-• '. :'''' :' - '' ';''''''.1:''''''-r' ' 'i'!7., ;:;:,.,1..'::,,,,!:',.-.....:'..:;:.•::'' 'S''''.- - . ...,' ,:--:-'".• ':',, , - - '''' " ....,. ,,„', . .._.,_. '• ''' '"- §.4...:0..... ;?; ';'.:..1...ti;F:.§tillitfo.,...;: i'1.1: a......_ •-.-, . ,,.. , ,•.,...7• .,. 1:,::%:. .-1-,V,A.1:k4-,Z;-' 7:*.''-. ,''.;'.."...'.''. ' '''.-,-.- .i; -'-',',....0'''''..-'''-2., '-'.'''• ..': . ..: '::,%'' ittitbVA.:7 ;',','-::,' •, -7::,!1,,:.'... :%'.. ,"."':::".;;:::.:. ' ,.:,....,....,..;:.:::,11;?...iA7-`.'Z'::- tjtafris'1-,rr,ri:z,,,,-•. ,.-,_.; „ • ,_-.,:.,,.._,......,t,..,,-1,,,:,,!1!..it,:,.:•::, ik!';;,:t4:4:.4,!..,7,0:..e.:.:,.., .,....:• :..'.,....-..;;.•,..,,:,•].,,,.-:., „,:i,..,..,. !';_f'"fl.';...-.1::•1;':•.f.,..-.'........T':',..2.-:'-4•••'''' ' - ' :•::•'-..1.,.•:;:y.,:!,F:i',:•'' - . _ , ,,;,;, Water and Sewer Rate Study EXECUTIVE SUMMARY AND RECOMMENDATIONS The City of Miami Beach (the "City") owns a water and sanitary sewer system (the "System" or the "Utility")that provides an essential service on a continual basis and that operates in a highly- regulated environment. Regulatory agencies for the Utility include the Florida Department of Environmental Protection (the "FDEP"), the South Florida Water Management District ("SFWMD"), the Florida Department of Health, and the Environmental Protection Agency. The System currently provides service to approximately 13,478 retail water accounts, 9,606 retail sewer accounts, and three (3) wholesale sewer customers (the Village of Bal Harbour, the Town of Bay Harbor Islands, and the Town of Surfside). The System is established as a utility enterprise fund and is a large "business" of the City. According to the Governmental Accounting Standards Board, "Enterprise Funds should be used to account for operations that are financed and operated in a manner similar to private business enterprises— where the intent of the governing body is that costs of providing services to the general public on a continuing basis should be financed or recovered primarily through user charges." The installed cost of System assets under City management was about $350 million as of September 30, 2019. The System should have revenues equal to the costs of the services provided by the Utility, and the City should establish rates sufficient to cover the cost of operating, maintaining, repairing, and financing the System. There are also rate covenants associated with the System's outstanding debt that require the City to establish the Utility's rates at certain levels to meet the debt obligations.To assist the City in reviewing the sufficiency of its rates, GovRates, Inc. ("GovRates")was retained to perform a utility rate study. h:C.7 F '..:i.,CL[ Targets The costs associated with operaling and maintaining a utility system, as well as the costs of financing the renewals / replacements of existing facilities and the capital improvements for upgrades and expansions, are generally considered to be the revenue requirements of public utilities such as the City's. With respect to identifying revenue requirements for the forecast Page 310 of 1707 ES-1 Water and Sewer Rate Study period of Fiscal Year 2020 through the Fiscal Year 2030 (the "Forecast Period"), the following Exhibit ES-1 shows the elements considered: Exhibit ES-1: Revenue Requirement Elements Operationand El y Y Maintenaneae L CY • Expenses• :. � a � : �nnua1 Revenue Requirements ttaigiriftbjcigt Administrative * ` _ Transfers and i Rates Reserve Allowances The financial and rate plan should recognize the need to maintain appropriate debt service coverage ratios and adequate operating margins and reserves to fund ongoing capital needs and maintain the financial condition of the System.A target all-in net revenues debt service coverage ratio of 200% is recommended, and it is proposed that the Utility target an unrestricted cash reserves balance equal to at least 365 days cash on hand (essentially one year of operating expenses excluding depreciation and amortization expenses). These debt service coverage and cash targets are consistent with those of strong financial credits. Higher credit ratings can translate to lower interest rates when debt financing and lower user rates over the long term for the benefit of the Utility's customers. The City's current water and sewer user rates have been in effect since October 1, 2019. As part of the current utility rate study, financial projections were prepared for the System for the Fiscal Year 2020 through the Fiscal Year 2030( previously defined as the "Forecast Period"). Based on the assumptions relied upon in the development of the System revenue requirements, GovRates has identified the need for rate adjustments for both the water system and the sewer system. The primary reasons for the identified rate adjustments are to: 1. Fund the Utility's multi-year capital improvement program (the "CIP"). The Utility has identified critical capital needs of approximately$122.2 million through the Fiscal Year 2024, and about $93 million in similar capital needs for Fiscal Years 2025 to 2030. These capital needs are based on recent utility master plan findings and are primarily replacements or rehabilitations of utility assets reaching the end of their service lives to continue providing reliable water and sewer service. A summary of the critical capital needs through Fiscal Year 2024, which have already been presented to the City Commission, is shown in the following Exhibit ES-2: Page 311 of 1707 ES-2 Water and Sewer Rate Study Exhibit ES-2: Summary of Critical Capital Needs Through the Fiscal Year 2024 Description Amount Water Main Replacements $36,388,459 Booster/Pump Station Projects 34,009,526 Sewer Main Replacements (Force and Gravity) 22,099,496 Meter Replacements 11,104,893 Manhole Inspection/Rehabilitation 7,963,704 Fire Flow Projects 5,238,982 Valve Replacements/Additions 2,781,810 Other 2,650,950 Total Major Capital Needs $122,237,819 Sample System Renewal and Replacement Needs: Water Main That Needs to Be Replaced 111111111i- -www,• —77 y:. � •• `{'Y• _arm " _ Sewer Pump Station Infrastructure That Needs to Be Replaced (Pictures from Sewer Master Plan) • • • Page 312 of 1707 ES-3 Water and Sewer Rate Study As shown in the following Exhibit ES-3,the critical capital needs through the Fiscal Year 2024 are projected to be funded from the remaining proceeds from the Utility's Series 2017 Bonds, additional debt proceeds through an assumed 2022 bond issue,and rate revenues/operating reserves (pay-as-you-go): Exhibit ES-3: Critical Capital Needs Funding Through Fiscal Year 2024(S122.2 M) ' o;,Pay-As-You-Go Funding i,‘ (19.4%) 550.2 M Remaining Proceeds from Series 2017 Bonds(39.5%) 5483 M Proceeds from Issuance of Additional Bonds in 2022 (41.1%) 2. Fund the costs of future operations. There are many factors that affect the costs of operations over which the Utility has limited or no control. Nearly 60% of the Utility's operating expenses are uncontrollable wholesale charges from Miami-Dade County.The City remits 6% of retail revenues to the Miami-Dade Department of Environmental Resources Management (DERM) to help pay for the costs of regulation of the City's Utility by Miami- Dade County. Factors such as cost increases from electric power providers, changes in fuel and oil prices resulting from global market changes, and competition for scarce resources such as concrete and building materials often result in cost increases that are greater than change in the consumer price index (general inflation). Utility costs also typically increase at a higher rate than general inflation due to regulatory requirements. It is important to recognize that these increased costs are usually permanent increases in the costs of operations and, as such, must ultimately be passed through to customers through rates. Inflation is expected to continue to affect System operating margins. The Congressional Budget Office has projected the national consumer price index (CPI) to continue increasing by over 2%per year during the Forecast Period despite the COVID-19 pandemic. 3. Maintain appropriate debt service coverage ratios and adequate operating margins and reserves to fund ongoing capital needs and maintain the financial condition of the System. The System's outstanding and anticipated debt consists of senior lien revenue bonds. The bond resolution contains a rate covenant that is a formal agreement between the City and bondholders. Page 313 of 1707 ES-4 Water and Sewer Rate Study The City has an opportunity to refund the Utility's outstanding Series 2010 Bonds to achieve debt service savings of about $16.5 million. The financial forecast presented in this report assumes that the City will move forward with the refunding. The City's existing user rates for water and sewer service are not anticipated to fully recover the City's projected utility revenue requirements during the Forecast Period. If the user rates are not adiusted, user rates may be even higher in the future. The capital needs for the System will not go away, but will most likely be more expensive to address in the future. Inflation and the costs of construction continue to affect System costs. Based on the financial forecast, the funding plan for the System, and discussions with City staff, the following Exhibit ES-4 shows the proposed revenue adjustments: Exhibit ES-4: Summar of Pro'osed Water and Sewer User Rate Revenue Ad'ustments Water Sewer Combined increase in Total Cost Per System System System Average SFR Gallon of Water Fiscal Adjustment Adjustment Adjustment Customer and Sewer Year Effective Date [1] [11 [1] Monthly Bill 121 Service[2] 2021 ASAP 3.5% 1.6% 2.4% $ 4.29 1.6C 2022 October 1,2021 3.5%+PTA 1.5%+PTA 2.3%+PTA 2.86 1.7C 2023 October 1,2022 3.5%+PTA 1.5%+PTA 2.3%+PTA 3.20 1.7C 2024 October 1,2023 3.5%+PTA 1.5%+PTA 2.3%+PTA 3.33 1.7C 2025 October 1,2024 3.5%+PTA 1.5%+PTA 2.3%+PTA 3.50 1.8C [1] PTA=Pass-Through Adjustment. [2] Based on proposed rates applied to single family residential ("SFR") customer with 7,000 gallons of monthly usage. These adjustments assume the continued pass-through of future wholesale rate adjustments from Miami-Dade County as allowed per the City Code of Ordinances. Beyond Fiscal Year 2025, the financial forecast also recognizes automatic rate indexing—also allowed per the City Code of Ordinances — to account for general increases in operating expenses other than the increased costs for wholesale service.The adjustments are considered by the City staff to be representative of the increases in costs to effectively operate and maintain the System given the specific requirements of the System service area. As shown in the preceding exhibit,the first adjustments are recommended to become effective as soon as possible. As further discussed in Section 2 of this report,it is recommended that the City gradually increase base charge recovery—the percentage of revenue recovered through fixed charges—to promote revenue stability. Most of the Utility's operating expenses and all the debt service are fixed. The effects of COVID-19 and the anticipated debt financing support increasing base charge recovery. Current fixed charge recovery is about 8%, but the utility industry recommended minimum is Page 314 of 1707 ES-5 r r;ti :.,. Water and Sewer Rate Study 30%. A summary of the existing and proposed monthly water and sewer user rates is shown in Table ES-1 at the end of this executive summary. The proposed rates produce bills that are competitive with those of other"neighboring" utilities. At a usage level of 7,000 gallons, the average monthly usage level of a single family residential customer, the combined water and sewer bill under the proposed Fiscal Year 2021 rates would be lower than those of the City of Lake Worth Beach, the City of Hollywood, the City of Dania Beach, the City of Wilton Manors, the City of North Miami Beach, the City of Oakland Park, and the Town of Davie. It is important to note that a rate or bill comparison is not a "report card" on how well a utility is performing, as there are several factors that affect the rate levels charged. .�,.5. ,�'_. r Iii:.,t e Rei,..., :r k' i:3 k i'.'€'1 C(• Wholesale sewer rates are charged to the Village of Bal Harbour,the Town of Bay Harbor Islands, and the Town of Surfside (the "Satellite Municipalities"). Based on the Miami-Dade County wholesale sewer rates,operations and maintenance expenses for the City's booster stations used in the sewer transmission, 1.5%administrative fees, and a renewal/replacement allowance,the proposed sewer rates for the Satellite Municipalities are shown in the following Exhibit ES-5: Exhibit ES-5: Pro•osed Fiscal Year 2021 Wholesale Sewer Rates Fiscal Year Effective Date Wet Season Dry Season Existing Per 1,000 Gallons $3.9519 $3.1006 Proposed Per 1,000 Gallons ASAP $4.0935 $3.2129 Change-% 3.6% 3.6% The Utility's consulting engineers are currently updating the transmission booster station costs, after which the City should "right-size"the wholesale sewer rates for the Satellite Municipalities. Tables ES-2 and ES-3 of this executive summary provides a financial overview of forecasted System operations. These tables indicate the following for all projected fiscal years, assuming that the projected user rate adjustments for all fiscal years are implemented: 1. Overall or all-in net revenues debt service coverage—net revenues divided by the annual debt service requirement—of at least 200%during most years of the Forecast Period.The Utility's rate covenants associated with the System's outstanding debt obligations include a 110%net revenues coverage requirement on the outstanding senior lien obligations. Utility best management practices recognize the need to target coverage ratios greater than the minimum required so that the Utility has sufficient operating margins to fund annual or Page 315 of 1707 ES-6 = : ; Water and Sewer Rate Study recurring renewal and replacement capital needs. Revenues remaining after the payment of operating expenses and debt service should be used for these"pay-as-you-go" reinvestments in the System to help ensure that the System remains operationally sustainable and that service interruptions to customers are avoided. 2. Maintenance of adequate operating reserves. 3. Maintenance of affordable rates. Bills for the average residential customer using 7,000 gallons per month are projected to remain well below 4.5% of the City's median household income throughout the Forecast Period. According to the Environmental Protection Agency, combined monthly water and sewer bills less than 4.5% of median household income are considered affordable. Based on the financial forecast and assuming the implementation of the proposed rate adjustments,the Utility is projected to remain in a good financial position through the Fiscal Year 2030. Based on our analyses and findings as summarized in this section of the report and as further detailed in Sections 1 and 2 of this report,GovRates recommends the following items for the City Commission's consideration: 1. Adopt the proposed monthly water and sewer rates. Smaller, incremental rate increases over time help to avoid future "rate shock" and "catch up" increases.The proposed rates will produce bills considered competitive and affordable and are anticipated to favorably position the utility for the issuance of additional bonds in a few years to fund replacement / rehabilitation of utility assets. Third-party evaluators such as credit rating agencies want to see that all increases needed to support debt have already been adopted. 2. Pass-through future wholesale rate increases from Miami-Dade County pursuant to the formula contained in the City's Code of Ordinances. 3. Proceed with the refunding of the Utility's outstanding Series 2010 Bonds to achieve debt service savings. 4. Right-size the wholesale sewer rates once updated costs of the City's sewer transmission booster stations are available. 5. Continue to monitor the financial position of the Utility system and adjust the financial and rate plan as needed. The long-term effects of COVID-19 as well as changes in economic conditions, customer usage trends, the regulatory environment, capital needs, etc. could potentially affect significantly the projections contained in this report. Page 316 of 1707 ES-7 • Water and Sewer Rate Study The remainder of this report provides additional details regarding the utility financial and rate analysis conducted on behalf of the City, including how the proposed rate adjustments were derived. Page 317 of 1707 ES-8 Table ES-1 City of Miami Beach, Florida Water and Sewer Rate Study Summary of Existing and Proposed Monthly Water and Sewer User Rates Fiscal Year Endin= Se'tember 30 ; ine Existing Proposed Proposed Proposed Proposed Proposed No, 2020 2021 2022 2023 2024 2025 WATER SERVICE -DOMESTIC Residential Base Facility Charge Meter Size 1 3/4" $ 8.50 $ 9.35 $ 10.29 $ 11.32 $ 12.45 $ 13.69 2 1" 8.87 9.76 10.74 11.81 12.99 14.29 3 1.5" 9.74 10.71 11.79 12.97 14.27 15.69 4 2" 10.61 11.67 12.84 14.13 15.54 17.09 5 3" 11.14 12.25 13.49 14.84 16.32 17.94 6 4" 12.83 14.11 15.53 17.09 18.79 20.66 Consumption Charge Per 1,000 Gallons 7 0 to 8,000 Gallons $ 0.98 $ 0.84 $ 0.88 $ 0.93 $ 0.97 $ 1.02 8 8,001 to 16,000 Gallons 2.70 2.31 2.42 2.56 2.67 2.81 9 16,001 to 24,000 Gallons 4.01 3.44 3.60 3.81 3.97 4.17 10 Over 24,000 Gallons 5.48 4.70 4.92 5.20 5.42 5.70 11 Purchased Water Pass-Through Rate Per 1,000 Gallons $ 1.88 $ 2.26 $ 2.26 $ 2.26 $ 2.26 $ 2.26 Page 318 of 1707 Table ES-1 City of Miami Beach, Florida Water and Sewer Rate Study Summary of Existing and Proposed Monthly Water and Sewer User Rates Fiscal Year Endin, Se'tember 30, tine Existing Proposed Proposed Proposed Proposed Proposed NI; 2020 2021 2022 2023 2024 2025 Master-Metered Multifamily Residential Service (Includes Apartment, Condominium, and Duplex) Base Facility Charge Meter Size 12 3/4" $ 8.50 $ 9.35 $ 10.29 $ 11.32 $ 12.45 $ 13.69 13 1" 18.36 20.20 22.23 24.45 26.89 29.57 14 1.5" 35.01 38.51 42.38 46.63 51.28 56.39 15 2" 54.84 60.32 66.39 73.03 80.32 88.32 16 3" 105.90 116.49 128.20 141.03 155.11 170.56 17 4" 164.46 180.91 199.09 219.02 240.89 264.88 18 6" 329.47 362.42 398.85 438.78 482.58 530.64 19 8" 520.30 572.33 629.87 692.92 762.09 837.99 20 10" 746.88 821.57 904.16 994.67 1,093.96 1,202.92 21 12" 1,380.67 1,518.74 1,671.42 1,838.73 2,022.28 2,223.69 Consumption Charge Per 1,000 Gallons 22 Block 1 $ 1.72 $ 1.47 $ 1.54 $ 1.63 $ 1.70 $ 1.79 23 Block 2 2.94 2.52 2.64 2.79 2.91 3.06 24 Block 3 3.91 3.35 3.51 3.71 3.87 4.07 25 Purchased Water Pass-Through Rate Per 1,000 Gallons $ 1.88 $ 2.26 $ 2.26 $ 2.26 $ 2.26 $ 2.26 Page 319 9f,1707 ; . ?14;.14, 4.. ES-10 Table ES-1 City of Miami Beach, Florida Water and Sewer Rate Study Summary of Existing and Proposed Monthly Water and Sewer User Rates Fiscal Year Endin Se$tember 30 Line Existing Proposed Proposed Proposed Proposed Proposed No. 2020 2021 2022 2023 2024 2025 Nonresidential Service (Includes Commerical, Hotel, and City) Base Facility Charge Meter Size 26 3/4" $ 8.50 $ 9.35 $ 10.29 $ 11.32 $ 12.45 $ 13.69 27 1" 18.36 20.20 22.23 24.45 26.89 29.57 28 1.5" 35.01 38.51 42.38 46.63 51.28 56.39 29 2" 54.84 60.32 66.39 73.03 80.32 88.32 30 3" 105.90 116.49 128.20 141.03 155.11 170.56 31 4" 164.46 180.91 199.09 219.02 240.89 264.88 32 6" 329.47 362.42 398.85 438.78 482.58 530.64 33 8" 520.30 572.33 629.87 692.92 762.09 837.99 34 10" 746.88 821.57 904.16 994.67 1,093.96 1,202.92 35 12" 1,380.67 1,518.74 1,671.42 1,838.73 2,022.28 2,223.69 Consumption Charge Per 1,000 Gallons 36 Block 1 $ 1.72 $ 1.47 $ 1.54 $ 1.63 $ 1.70 $ 1.79 37 Block 2 2.94 2.52 2.64 2.79 2.91 3.06 38 Block 3 3.91 3.35 3.51 3.71 3.87 4.07 39 Purchased Water Pass-Through Rate Per 1,000 Gallons $ 1.88 $ 2.26 $ 2.26 $ 2.26 $ 2.26 $ 2.26 Page 320 of 1707 Table ES-1 City of Miami Beach, Florida Water and Sewer Rate Study Summary of Existing and Proposed Monthly Water and Sewer User Rates ;F` - ' , . ` ' ' ' - - . ' " : )E+iscal Year Endin_ Se.tetnber 30 .. .Line Existing Proposed Proposed Proposed Proposed. Proposed :No. . 2020 .2021 2022 2023 2024 2025 WATER SERVICE -IRRIGATION Residential Water Base Facility Charge Meter Size 40 3/4" $ 8.50 $ 9.35 $ 10.29 $ 11.32 $ 12.45 $ 13.69 41 1" 8.87 9.76 10.74 11.81 12.99 14.29 42 1.5" 9.74 10.71 11.79 12.97 14.27 15.69 43 2" 10.61 11.67 12.84 14.13 15.54 17.09 44 3" 11.14 12.25 13.49 14.84 16.32 17.94 45 4" 12.83 14.11 15.53 17.09 18.79 20.66 Consumption Charge Per 1,000 Gallons 46 0 to 16,000 Gallons $ 2.69 $ 2.31 $ 2.42 $ 2.55 $ 2.66 $ 2.80 47 Over 16,000 Gallons 5.48 4.70 4.92 5.20 5.42 5.70 48 Purchased Water Pass-Through Rate Per 1,000 Gallons $ 1.88 $ 2.26 $ 2.26 $ 2.26 $ 2.26 $ 2.26 Page 321 of 1707 ES-12 , ;. Table ES-1 City of Miami Beach, Florida Water and Sewer Rate Study Summary of Existing and Proposed Monthly Water and Sewer User Rates fiscal Year Endin,. Si;tember 3Q kine Existing Proposed Proposed Proposed Proposed Proposed NO. 2020 -- . .2021 '2022 2023 2024 " 2025 Master-Metered Multifamily Residential Service (Includes Apartment, Condominium, and Duplex) Base Facility Charge Meter Size 49 3/4" $ 8.50 $ 9.35 $ 10.29 $ 11.32 $ 12.45 $ 13.69 50 1" 18.36 20.20 22.23 24.45 26.89 29.57 51 1.5" 35.01 38.51 42.38 46.63 51.28 56.39 52 2" 54.84 60.32 66.39 73.03 80.32 88.32 53 3" 105.90 116.49 128.20 141.03 155.11 170.56 54 4" 164.46 180.91 199.09 219.02 240.89 264.88 55 6" 329.47 362.42 398.85 438.78 482.58 530.64 56 8" 520.30 572.33 629.87 692.92 762.09 837.99 57 • 10" 746.88 821.57 904.16 994.67 1,093.96 1,202.92 58 12" 1,380.67 1,518.74 1,671.42 1,838.73 2,022.28 2,223.69 Consumption Charge Per 1,000 Gallons 59 Block 1 $ 2.69 $ 2.31 $ 2.42 $ 2.55 $ 2.66 $ 2.80 60 Block 2 5.48 4.70 4.92 5.20 5.42 5.70 61 Purchased Water Pass-Through Rate Per 1,000 Gallons $ 1.88 $ 2.26 $ 2.26 $ 2.26 $ 2.26 $ 2.26 Nonresidential Service (Includes Commerical,Hotel, and City) Page 322 of 1707 Table ES-1 City of Miami Beach, Florida Water and Sewer Rate Study Summary of Existing and Proposed Monthly Water and Sewer User Rates Fiscal Year Endin! Se tember'30 gine • Existing Proposed Proposed Proposed Proposed Proposed [o.,;.,: . 't`- 2020 2021 2022 2023 .2024 2025 Base Facility Charge Meter Size 62 3/4" $ 8.50 $ 9.35 $ 10.29 $ 11.32 $ 12.45 $ 13.69 63 1" 18.36 20.20 22.23 24.45 26.89 29.57 64 1.5" 35.01 38.51 42.38 46.63 51.28 56.39 65 2" 54.84 60.32 66.39 73.03 80.32 88.32 66 3" 105.90 116.49 128.20 141.03 155.11 170.56 67 4" 164.46 180.91 199.09 219.02 240.89 264.88 68 6" 329.47 362.42 398.85 438.78 482.58 530.64 69 8" 520.30 572.33 629.87 692.92 762.09 837.99 70 10" 746.88 821.57 904.16 994.67 1,093.96 1,202.92 71 12" 1,380.67 1,518.74 1,671.42 1,838.73 2,022.28 2,223.69 Consumption Charge Per 1,000 Gallons 72 Block 1 $ 2.69 $ 2.31 $ 2.42 $ 2.55 $ 2.66 $ 2.80 73 Block 2 5.48 4.70 4.92 5.20 5.42 5.70 74 Purchased Water Pass-Through Rate Per 1,000 Gallons $ 1.88 $ 2.26 $ 2.26 $ 2.26 $ 2.26 $ 2.26 Page 323 of 1707 Table ES-1 City of Miami Beach, Florida Water and Sewer Rate Study Summary of Existing and Proposed Monthly Water and Sewer User Rates Year Endin_ Se ' 3 .,. .. . _ - .. . � Fiscal . �tember 30 . 1ne Existing Proposed 'Proposed Proposed Proposed" Proposed !to., .. . , . 2020. 2021 2022 2023 2024 , 2025 SEWER SERVICE Residential Sewer Base Facility Charge Meter Size 75 3/4" $ 9.19 $ 10.11 $ 11.12 $ 12.24 $ 13.46 $ 14.81 76 1" 9.19 10.11 11.12 12.24 13.46 14.81 77 1.5" 9.19 10.11 11.12 12.24 13.46 14.81 78 2" 9.19 10.11 11.12 12.24 13.46 14.81 79 3" 9.19 10.11 11.12 12.24 13.46 14.81 80 4" 9.19 10.11 11.12 12.24 13.46 14.81 Consumption Charge Per 1,000 Gallons 81 All Flow $ 4.63 $ 5.01 $ 5.10 $ 5.20 $ 5.30 $ 5.38 82 Purchased Sewer Pass-Through Rate Per 1,000 Gallons $ 5.51" $ 5.25 $ 5.25 $ 5.25 $ 5.25 $ 5.25 Page 324 of 1707 ES-15 Table ES-1 City of Miami Beach, Florida Water and Sewer Rate Study Summary of Existing and Proposed Monthly Water and Sewer User Rates discal Year Endin l Se i tember 3!0 tine Existing Proposed Proposed Proposed Proposed Proposed lYo.. 2020 2021 2022 2023 2024 2025 Master-Metered Multifamily Residential Service (Includes Apartment, Condominium, and Duplex) Base Facility Charge Meter Size 83 3/4" $ 9.19 $ 10.11 $ 11.12 $ 12.24 $ 13.46 $ 14.81 84 1" 20.52 22.57 24.83 27.33 30.05 33.07 85 1.5" 39.42 43.37 47.70 52.50 57.74 63.53 86 2" 62.09 68.31 75.13 82.70 90.94 100.06 87 3" 122.55 134.82 148.29 163.22 179.49 197.49 88 4" 190.57 209.65 230.59 253.82 279.12 307.11 89 6" 379.51 417.50 459.21 505.46 555.84 611.59 90 8" 606.23 666.92 733.54 807.43 887.91 976.96 91 10" 870.74 957.91 1,053.60 1,159.72 1,275.32 1,403.23 92 12" 1,626.49 1,789.32 1,968.07 2,166.29 2,382.21 2,621.14 Consumption Charge Per 1,000 Gallons 93 All Usage $ 4.63 $ 5.01 $ 5.10 $ 5.20 $ 5.30 $ 5.38 94 Purchased Sewer Pass-Through Rate Per 1,000 Gallons $ 5.51 $ 5.25 $ 5.25 $ 5.25 $ 5.25 $ 5.25 Page 325 of 1707 • «�: ;P..111:4i . .;i34.; icy ES-16 Table ES-1 City of Miami Beach, Florida Water and Sewer Rate Study Summary of Existing and Proposed Monthly Water and Sewer User Rates qv: Fiscal: ear Endin, Se 8.tenther 30 Line Existing Proposed Proposed Proposed Proposed Proposed No. 2020 2021 2022 2023 2024 2025 Nonresidential Service (Includes Commerical, Hotel,and City) Base Facility Charge Meter Size 95 3/4" $ 9.19 $ 10.11 $ 11.12 $ 12.24 $ 13.46 $ 14.81 96 1" 20.52 22.57 24.83 27.33 30.05 33.07 97 1.5" 39.42 43.37 47.70 52.50 57.74 63.53 98 2" 62.09 68.31 75.13 82.70 90.94 100.06 99 3" 122.55 134.82 148.29 163.22 179.49 197.49 100 4" 190.57 209.65 230.59 253.82 279.12 307.11 101 6" 379.51 417.50 459.21 505.46 555.84 611.59 102 8" 606.23 666.92 733.54 807.43 887.91 976.96 103 10" 870.74 957.91 1,053.60 1,159.72 1,275.32 1,403.23 104 12" 1,626.49 1,789.32 1,968.07 2,166.29 2,382.21 2,621.14 Consumption Charge Per 1,000 Gallons 105 All Usage $ 4.63 $ 5.01 $ 5.10 $ 5.20 $ 5.30 $ 5.38 106 Purchased Sewer Pass-Through Rate Per 1,000 Gallons $ 5.51 $ 5.25 $ 5.25 $ 5.25 $ 5.25 $ 5.25 Page 326 of 1707 . • K: , .. . . . . ES-17 e, a n: I '}�l . ; \/t . R i Table ES-2 i . I.e 1.F¶. ,.i lam!1,,:�,t1 ii .,ro N ti City of Miami Beach, Florida Water and Sewer Rate Study Water and Sewer System Financial Overview Fiscal Year Ending September 30, I i .1.i-Level Summary 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 Identified Revenue Adjustments Water System 0.00% 3.50% 3.50% 3.50% 3.50% 3.50% 0.82% 0.83% 0.81% 0.83% 0.85% Sewer System 0.00% 1.61% 1.50% 1.50% 1.50% 1.50% 0.82% 0.83% 0.81% 0.83%. 0.85% Combined System 0.00% 2.37% 2.32% 2.33% 2.34% 2.35% 0.82% 0.83% 0.81% 0.83% 0.85% Pass-Through Adjustments(PTA) +PTA +PTA +PTA +PTA +PTA +PTA +PTA +PTA +PTAj Effective Months 12 9 12 12 12 12 12 12 12 12 12 Unrestricted Cash Balance($000's) $ 73,288 $ 77,839 $ 86,177 $ 96,060 $ 103,315 $ 108,116 $ 106,594 $ 109,215 $ 95,365 $ 100,105 $ 106,924 365 Days Cash on Hand 66,109 66,608 69,126 71,651 72,460 73,291 74,047 74,827 75,626 76,451 77,296 ;All-In Net Revenues Debt Coverage 144% 266% 255% 214% 226% 212% 212% 239% 239% 238% 238%1 Senior Lien Debt Coverage(No Admin) 165% 298% 283% 235% 248% 232% 233% 263% 264% 263% 264%f 1Revenue Surplus/(Deficiency)($000's): Combined System-Amount (1,299) 4,551 8,338 9,883 7,255 4,802 (1,523) 2,621 (13,850) 4,740 6,819 Combined System-Percent -1.6% 6.0% 10.6% 12.0% 8.3% 5.2% -1.5% 2.7% -12.3% 5.0% 7.3%1 Monthly Bill(a,7,000 Gallons $ 108.69 $ 112.98 $ 115.84 $ 119.04 $ 122.37 $ 125.87 $ 126.45 $ 127.11 $ 127.69 $ 128.36 $ 129.03 Increase 4.29 2.86 3.20 3.33 3.50 0.58 0.66 0.58 0.67 0.67 Cost Per Gallon of Total Bill $ 0.016 $ 0.016 $ 0.017 $ 0.017 $ 0.017 $ 0.018 $ 0.018 $ 0.018 $ 0.018 $ 0.018 $ 0.018 Percent of MHI(Target<4.5%) 2.44% 2.52% 2.55% 2.60% 2.65% 2.69% 2.68% 2.67% 2.65% 2.64% 2.63% 1)Summarized Revenue Requirements Analysis-Combined Systems 2)Ending Unrestricted Cash Balances $140,000 i $120,000 1 _ j 5,$120,000 1 lo - $100,000 "i z $100,000 Io ' $80,000 -' -- $80,000 g $60,000 I d 540,000 ; 1::: $20,000 < $20,000 i 2020 2021 2022 2023 2024 2025 2026 T 2027 . 2028 2029 . 2030 $0 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 Deposits to Working Capital-Additional Capital Funding aaaamin Capital Funded from Rates Capital Replacement and Improvement Funds and R&R Fund Transfer to Capital Replacement and Improvement/R&R Funds ma.l.s Net Debt service mai Operating and Maintenance Fund;Rate Stabilization Fund(Working Capital) Current Expenses Projected Revenues Under Proposed Rates --- Projected Revenues Under Existing Rates ..•••••••365Days Cash on Hand Page 327 of 1707 . .. , , ES-18 t ak j A 1 B L._' Table ES-2 City of Miami Beach,Florida Water and Sewer Rate Study Water and Sewer System Financial Overview 3)All-In Debt Service Coverage-Net Revenues Only 4)Outstanding Debt Principal to Net Capital Assets 300% • 70% 1 64% 266% 62% ° o 250% a 255% 238% 60% 57% ' :• . 60/0 59/0 57%0 56% 239%. ..239% 238%.,_. ! -r n o o S o d ' - '. ,b, .�• y. 52/0 52% 51% 214% 226% 212% 212/o 51/o + S' #("i bf* 50% , . 200% ° alt s ,1!i a 4 150% 1 144% i s 4' ii. sly' 'it °�S l- , - 100% ) wg,� 44. I.1, 3 0 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 mom Calculated Debt Service Coverage -Target Debt Service Coverage(200%) Outstanding Debt to Net Utility Fixed Assets ® Required Debt Service Coverage(110%) -Not-to-Exceed Percentage(50%);Fitch Medians by Rating:AAA=24%,AA=46%,A=55% 5)Existing and Anticipated Debt Outstanding-Beginning 6)Capital Improvement Program Funding($227.5 M) $250,000 Principal Balance /� I ,.yd .7-.., X200,000 3-. ... �a'ny u! Rate Revenues and Operating w 1 _ p. . g = 21.2% ..1,00$41t,14‘'10 Reserves($129.0 M) 45150,000 . ... o k14 .1 r , Sia sta int. 1100,000 .. ... ... ._. .._ .... .. .. .. ... .... .... _.. .... .._. .... y3 Additional Debt Proceeds($50.2 M) 2i $50,000 21%/% _'�s ;. sn� ° � �}ra�t ! Series 2017 Bonds Proceeds($48.3 M) 2020 2025 2030 2035 2040 2045 = ii..�� , 4 ' -1- a.-111.12,:i; yV.1.-:. ''r. Proposed Debt Existing Debt f---Total Debt Service Payments M, Page 328 of 1707 !. . , . . fiG a.'n?:17• . . . ES-19 ^'t '""'"ii 3 Table ES-2 . t,1 if ,l ii 1-..:l 3µy,A,,ii,,„s ;. City of Miami Beach, Florida Water and Sewer Rate Study Water and Sewer System Financial Overview 7)Funding of Capital Improvement Program by Fiscal Year($227.5 M) 8)Available Year-End Working Capital Cash Balance $40,000 Working capital is a component of overall unrestricted cash balances. Please see preceding graph entitled"2)Ending Unrestricted Cash Balances." IT, $35,000 ' $120,000 , o e $30,000 =.;f ,e 100,000 1 Is $25,000 rI o :A C Ilk i $80,000 .[ „ $20,000 .t i! o °o $15,000 ; ''r' k i 4 1 v, $60,000 IN ,` :: a. w d $10, _. 000 � Ix;: t.... '�� i u ivii e $40,000 $5,000 a • -' r g i E SO ...,... ;., e,,.., ..E. ,_._.. ,......_ ,. .�'+'. .r _n '� .. d $20,000 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 $0 •Series 2017 Bonds Proceeds($48.3 M) Additional Debt Proceeds($50.2 M) 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 aaaam•Ending Cash Balance-Operating and Maintenance Fund;Rate Stabilization Fund(Working Capital) Rate Revenues and Operating Reserves($129.0 M) Target Balance-120 Days of Rate Revenue 9)Available Year-End Capital Replacement and R&R Fund Cash 10)Free Cash as a%of Depreciation Balances 300% 1270% 271% 269% 269% $7,000 , 275% 4 ° ° i i las/o las/0 246/o $6,000 1 . . . 250% " 224% 222% 225% Ewa 197% C $5,000 i200% 0 175% 1 a $4,000 1 / 150% . f. I .�..$3,000 I 125% .S 100%. 'a $2,000 75% 1 a 50% i $1,000 f % 25 0% Y.._. r.._.T . ... T _ ._._ r _ 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 Ending Cash Balance-Capital Replacement and Improvement Fund Sewer Ending Cash Balance-Capital Replacement and Improvement Fund Water ovoleF Free Cash as a%of Depreciation ---Target Minimum(100%) -One Year of Depreciation Expense($6,177,000) Page 329 of 1707 ES-20 F; ; 1 ., :,. �:t ,.r : i Table ES-2 �'1,:4 t:.:: , .. ':!I 7' r: it 1'� !.-!' .�: ' y''n,,.n i w� City of Miami Beach,Florida Water and Sewer Rate Study Water and Sewer System Financial Overview 11)Calculated Operating Ratio 12)Ending Cash Balance-Connection Fee and Construction Funds 100.00% . $30,000 'I 90.00% 1 ' 80.00% ,`: .....$25,000 '•. b 70.00% -1 a$20,000 60.00% °° 1 50.00% _E c...= $15 ,000 40.00% ;.J ... . o e$10,000 0.00% i i 20.00% . C $5,000 .1 • 10.00% 1 ! 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2020 2021 2022 zl►z> 2024 2025 2026 2027 2025 2029 2030 Sewer Connection Fee Fund Water Connection Fee Fund Em Calculated Operating Ratio—Moody's Median(65.5%) Construction Fund 13)Revenue Requirements Analysis-Water System 14)Revenue Requirements Analysis-Sewer System $70,000 , $70,000 I......... t i $60,000 — '7'.•, • $60,000 _ — _ el wa$50,000 Si$50,000 lEE e_ — — — t4 , ie 1-I d$20,000 i 3 $10,000 4 $10,000 4 4 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 Deposits to Working Capital-Additional Capital Funding Deposits to Working Capital-Additional Capital Funding ent sm Capital Funded from Rates Capital Funded from Rates Transfer to Capital Replacement and Improvement/R&R Funds Transfer to Capital Replacement and Improvement/R&R Funds ,-^*^+..Net Debt Service Net Debt Service ati Operating Expenses aari Operating Expenses Projected Revenues Under Proposed Rates Projected Revenues Under Proposed Rates Page 330 of 1707 ES-21 • ''1 1`x 1;1 ' :x i� : �l. t_') Table ES-2 City of Miami Beach,Florida Water and Sewer Rate Study Water and Sewer System Financial Overview 15)Projected Water System Accounts 16)Projected Sewer System Customers 2030 s 13,478 2030 9,606 2029 a 13,478 2029 9,606 2028 = 13,478 2028 9,606 2027 13,478 2027 _ 9,606 2026 E 13,478 2026 9,606 i>"2025 13,478 : w>2025 9,606 2024 t 13,478 2024 9,606 2023 !I 13,478 2023 9,606 2022 i 13,478 2022 9,606 2021 1 13,478 2021 y 9,606 2020 1 13,478 2020 IMMINIM1111111111.11111.1111 9,606 2019 1 13,478 2019 9,606 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 0 2,000 4,000 6,000 8,000 10,000 12,000 Water Customers ' 17)Projected Water System Equivalent Residential Connections 18)Projected Sewer System Equivalent Residential Connections 2030 i 53,272 2030 i 36,969 2029 53,272 2029 ! 36,969 2028 53,272 2028 1 36,969 2027 ! 53,272 2027 I 36,969 cW+ 42026 53,272 i 2026 36,969 6 2025 s 53,272 4' 2025 36,969 2024 53,272 2024 I 36,969 2023 53,272 2023 36,969 2022 53,272 2022 36,969 2021 53,272 2021 36,969 2020 53,272 2020 36,969 2019 's 53,272 2019 36,969 0 10,000 20,000 30,000 40,000 50,000 60,000 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 Water Equivalent Residential Connections Page 331 of 1707 • i._ Table ES-2 City of Miami Beach,Florida Water and Sewer Rate Study Water and Sewer System Financial Overview 19)Water Purchases from Miami-Dade County 20)Sewer Purchases from Miami-Dade County 25.000 : 25.000 20.000 } 20.000 -1 A 3 6 15.000 r.715.000 X 4 1a 10.000 ; 10.000 -[ W s U 5.000 U5.000 1 0.000 a... . .. .:...... ....... ._.._ __,..._-_._... ...._... ,._.,......._....:_-........._._.......... . . 0.000 .,.._. __.,...... --- .- --. - --.-. 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 Water Purchased(MGD) •Sewer Treated(MGD) 21)Single Family Residential Bill @ Monthly Usage of 7,000 Gallons 22)Affordability of SFR Bill @ Monthly Usage of 7,000 Gallons $140.00 $122.37 $125.87 5126.45 $127.11 $127.69 $128.36 5129.03 5.00% • $120.00 $112.98 $115.84 $119.044.50% $108.69 4.00% $100.00 $89.22 $89.52 $90.09 $90.49 $90.97 591.45 3.50% $81.93 $85.39 $87.31 F_ 80.17 $83.57 3.00% 0 0 2.68% 2.67% 2.65% 2.64% 2.63% $80.00 0 2.52% 2.55% 2.60% 2.65% 2.69/o oC 2.50% 2.44/o a $60.00 2.00% i 1.50% r $40.00 S 5I5;b0Is12216F601661 111 111111 1 I S36 S37 537 $37 837 1.00% Ef0.50%..y♦ T _ 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 ...MO Single Family Residential Combined Bill as%of Median Household Income Water Charge ■Sewer Charge Total Bill -Environmental Protection Agency Affordability Threshold(4.5%of Median Household Income) Page 332 of 1707 .. .u.., i . ..,,,:,,. , . • . ES-23 -. il, li.J is: .:�. r' ;L Table ES-2 .i lir " ,i .--“,,....t. n,, City of Miami Beach,Florida Water and Sewer Rate Study Water and Sewer System Financial Overview 23)Water: 11-Year Summary of Projected Current Expenses 24)Sewer:11-Year Summary of Projected Current Expenses 10.7% Miami-bade County Purchased 11.8% • Miami-Dade County Purchased 2.0% I '-';',4',7,,,,,, Water('osis($156.1 M) ° I water Costs($286.5 M) k.! Salaries and Benefits(56(1.3 M) ::::: ! T 6.1% _ ../ Internal Serviccs Charges($211.5 M) y., *f 4 Administration Fees($14.9 M) ',h} Administration Fees($15.1)M) 'in ` •°, ,v:_ • Professional Services($6.5 M) Contract Maintenance Fees($12.5 i `S t e''i 8.8% . M) st e`•r ' 'a Contract Maintenance Fees($6.4 M) Professional Services($5.7 M) 18.6/o ,K,','0:,,1:.,.,', r 4 ? .' •Other Operating Expenses($34.7 M) •Other Operating Expenses($55.8 M) Page 333 of 1707 - .r, ES-24 Table ES-3 City of Miami Beach,Florida Water and Sewer System Multi-Year Financial Projections . ilikdi:i L,tevi 8ah1111tafy . '2019 . °2020.. 2021 2022 1023 . 2024 2025 , 2026- 2021 2028 2029 2030 Operating Revenue User Rate Revenue-Retail Water User Rate Revenue Before Current Year Adjustment $ 31337.902 $ 32.015,679 $ 34.548.767 5 37,219,955 $ 38,522,655 $ 39,870.955 $ 41,266.455 $ 41.603,155 5 41.949.955 $ 42,291,755 $ 42,644,055 Additional User Rate Increase-Water 0.0% 3.5% 3.5% 3.5% 3.5% 3.5% 0.8% 0.8% 0.8% 0.8% 0.9% Total Water User Rate Revenue $ 35,641,654 $ 31.337,902 5 32,856.079 $ 35.757,967 $ 38,522,655 $ 39,870,955 $ 41,266.455 $ 41,603.155 $ 41,949,955 $ 42,291.855 5 42,644,055 $ 43,007,255 Sewer User Rate Revenue Before Current Year Adjustment $ 46.507.450 $ 47,537.926 $ 50,162.741 $ 52,802,557 $ 53,594,657 $ 54.398.557 $ 55.214,557 $ 55,664.957 $ 56,128,957 $ 56,586,357 S 57,057,757 Additional User Rate Increase-Sewer 0.0% 1.6% 1.5% 1.5% 1.5% 1.5% 0.8% 0.8% 0.8% 0.8% 0.9% Total Sewer User Rate Revenue $ 49.753.057 $ 46,507,450 $ 48.111.926 $ 50,915,141 $ 53.594,557 $ 54,398,557 $ 55,214,557 $ 55,664,957 5 56.128.957 $ 56.586,357 $ 57,057,757 $ 57,543,657 Total User Rate Revenue-Retail $ 85.394.711 $ 77,845,352 $ 80,968.005 $ 86,673,109 $ 92.117,213 $ 94,269,513 $ 96,481.013 $ 97,268,113 $ 98,078,913 $ 98,878,213 $ 99,701,813 5 100,550,913 Other Operating Revenue - $ 4,268.847 $ 4,368,500 $ 4,386,500 5 4.386,500 $ 4,386,500 $ 4,386,500 5 4.386,500 $ 4.386.500 $ 4,386,500 5 4.386.500 $ 4,386,500 $ 4,386,500 TOTAL OPERATING REVENUE S 89,663,558 $ 82,213,852 $ 85,354,505 5 91,059,609 5 96,503,713 $ 98,656,013 $100,867,513 $101,654,613 $102,465,413 $103,264,713 $104,088,313 $104,937,413 Current Expenses Water Operating Expenses $ 26,602,120 $ 26,719,579 $ 27,845,551 $ 28,972,514 $ 29,396,145 $ 29,832,667 $ 30,207,890 $ 30,595.091 $ 30,992,741 $ 31,403,244 $ 31,823,947 Sewer Operating Expenses 39,507,077 39,888,871 41,280,476 42,678,101 43,063,440 43,458,324 43,838,884 44,231,455 44,633,347 45,048,143 45,471,701 TOTAL CURRENT EXPENSES It] $ 61,407,739 $ 66,109,197 $ 66,608,450 5 69,126,028 $ 71,650,615 $ 72,459,585 $ 73,290,991 $ 74,046,774 5 74,826,547 5 75,626,087 $ 76,451,388 $ 77,295,648 Percent Change 7.7% 0.8% 3.8% 3.7% 1.1% 1.1% 1.0% 1.1% 1.1% 1.1% 1.1% Operating Revenues Less Current Expenses $ 28,255,819 $ 16,104,655 $ 18,746,055 5 21,933,581 $ 24,853,097 $ 26,196,427 $ 27,576,521 5 27,607,838 $ 27,638,866 $ 27,638,625 5 27,636,925 $ 27,641,765 Non-Operating Revenue Unrestricted Interest Income $ 791,356 $ 791,356 $ 751,231 $ 800,634 $ 891,858 $ 990,677 $ 1,066,936 $ 1,114,963 $ 1,096,011 $ 1,122,216 5 983,728 $ 1,031,136 Net Revenue Available for Debt Service - S 29,047,175 $ 16,896,011 $ 19,497,286 $ 22,734,215 $ 25,744,956 5 27,187,104 $ 28,643,458 $ 28,722,801 $ 28,734,877 $ 28,760,841 $ 28,620,653 S 28,672,901 City Debt Service Existing Debt Service-Principal and Interest 5 11,727338 $ 7.339,800 $ 7,435,000 $ 9,503,850 $ 9,497,950 5 10,983,700 $ 10,987,200 5 9,496.650 $ 9,495,000 $ 9,498,000 5 9,499,900 New Debt Service-Principal and Interest - - 1,463,367 2,532,750 2,532,750 2,532,750 2,532,750 2,532,750 2.532,750 2,532.750 2,532.750 Less Impact Fees Used for City Growth-Related Debt Service 1,036,345 - - - - - - - - - - NET DEBT SERVICE $ 10,690,993 5 7,339,800 $ 8,898,367 $ 12,036,600 S 12,030,700 $ 13,516,450 5 13,519,950 $ 12,029,400 5 12,027,750 S 12,030,750 $ 12,032,650 Grant Reimbursements $ - $ - $ - $ - S - 5 - 5 - $ - $ - $ - $ - Less Equipment Loan Payments $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Total Revenue Available for Capital Rehabilitations/Improvements 5 6,205,018 5 12,157,486 S 13,835,849 S 13,708,356 $ 15,156,404 S 15,127,008 $ 15,202,851 S 16,705,477 $ 16,733,091 $ 16,589,903 $ 16,640,251 Capital Expenditures Capital Program as Scheduled Capital Projects-Water $ 20.828.206 $ 11.410,275 $ 13,959,480 $ 10,896,439 $ 10,579,357 $ - $ 7.681000 $ 5.400,000 $ 22.820,000 $ 3.618,000 $ 3,618,000) Capital Projects-Sewer 11.975.538 19.110.780 13,720,563 7,184,523 7,377,559 8,999,500 8,272,000 7377,000 6,455,000 6,924,000 4,895,600 Departmental Capital-Water 645.000 1,472,000 685,804 614.000 627,870 659,338 479,867 739.126 739.126 739,126 739,126 Departmental Capital-Sewer 25.000 1,218,000 332,444 58,313 1,388,573 666,366 291,578 568,468 568,468 568,468 568,468 Total Capital Program as Scheduled $ 33.473.743 5 33.211.055 $ 28.698,292 $ 18,753,275 $ 19,973,359 $ 10,325,204 $ 16.725,445 5 14,084.593 $ 30,582.593 $ 11,849,593 $ 9,821,193 Page 334 of 1707 L'S-2.5 •-'II!i,',;,. •• x;`,': ,'.rr •.'. Table ES-3 • City of Miami Beach,Florida Water and Sewer System Multi-Year Financial Projections AMU ttl t fcaf Ycar7Lntl(n:September TI, •a 1p(I Levtl Sutlimary if - 2619. • _ ' 202 .-.: , 2021 2023. ..2023 - 2084, , ..2025 2026 2027 2028 2029 2030 Adjustments - Capital Projects-Water S - S - q - S - S - S - 5 - 5; - S - $ - S - Capital Projects-Sewer - - - - - - - - - - Departmental Capital-Water - - - - - - - - - - Departmental Capital-Sewer - - - - - - - - - Total Adjustments $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Capital Projects us Adjusted Capital Projects-Water $ 20.828,206 $ 11,410,275 $ 13,959,480 $ 10,896,439 $ 10,579,357 $ - $ 7.682.000 $ 5.400,000 S 22,820.000 $ 3.618,000 $ 3,618,000 Capital Projects-Sewer 11,975,538 19.110.780 13,720.563 7,184.523 7,377,559 8,999.500 8,272,000 7.377,000 6,455.000 6,924.000 4.895,600 Departmental Capital-Water 645,000 1.472,000 685,804 614,000 627,870 659.338 479,867 739,126 739,126 739,126 739,126 Departmental Capital-Sewer 25,000 1,218,000 332,444 58,313 1,388,573 666,366 291.578 568,468 568,468 568,468 568,468 ADJUSTED CAPITAL EXPENDITURES $ 33,473,743 $ 33,211,055 5 28,698,292 $ 18,753,275 $ 19,973,359 S 10,325,204 $ 16,725,445 S 14,084,593 $ 30,582,593 $ 11,849,593 5 9,821,193 Cash Surplus/(Deficiency) Base Surplus/(Deficiency) $(27,268,726) $(21,053,569) $ (14,862,443) $ (5,044,920) $ (4,816,954) $ 4,801,804 $ (1,522.594) $ 2.620,883 $ (13,849,502) $ 4,740,309 $ 6,819,057 Less Projects to Be Funded Through Surtax - - - - - - - - - - - Less Projects to Be Funded by Developers - - - - - - - - - - - Less Projects to Be Funded Through Connection I Impact Fees - - - - - - - - - - - Less Projects to Be Funded Through Proceeds from Existing and Proposed Debt 22,736,867 25,604,255 23,200,292 14,928,290 12,071,418 - - - - • - - INCREASE/DECREASE IN UNRESTRICTED FUND BALANCES $ (4,531,859) S 4,550,686 $ 8,337,849 $ 9,883,370 $ 7,254,464 $ 4,801,804 $ (1,522,594) $ 2,620,883 $(13,849,502) $ 4,740,309 $ 6,819,057 Debt Service Coverage Net Revenue Available for Debt Service $ 16,896,011 $ 19,497,286 8 22,734.215 $ 25,744,956 $ 27,187.104 $ 28.643.458 $ 28,722,801 5 28.734.877 $ 28,760,841 $ 28,620,653 $ 28,672,901 Add Back Admin Fees 2.400.000 2,400,000 2,472.000 2.546,160 2,622,545 2.701,221 2,782,258 2,865,726 2,951,697 3,040,248 3.131,456 Net Revenue Available for Debt Service without Payment of Admin Fees $ 19,296,011 $ 21,897,286 $ 25.206.215 $ 28.291,116 $ 29.809.649 S 31,344.679 $ 31,505.059 5 31.600.602 $ 31,712.538 5 31,660,901 $ 31.804,356 Total Debt Service 11.727,338 7.339.800 8.898.367 12.036.600 12,030.700 13,516,450 13.519.950 12,029,400 12,027.750 12,030,750 12.032.650 SENIOR LIEN DEBT SERVICE COVERAGE(DOES NOT INCLUDE ADMIN FEES) 1.65 2.98 2.83 2.35 2.48 2.32 2.33 2.63 2.64 2.63 2.64 ALL-IN DEBT SERVICE COVERAGE 1.44 2.66 2.55 2.14 2.26 2.12 2.12 2.39 2.39 2.38 2.38 Cash Balances Beginning of Year Cash Balances $134.035.830 Less Construction/Loan Fund Balance (48.341,122) Less Customer Deposits (6,838,350) Less Debt Service Reserve Account - Less Connection/Impact Fees (1,036,345) Less Carryforward Projects - Beginning of Year Fund Balance-Net Cash $ 77,820,014 $ 73,288,155 $ 77,838.841 $ 86,176,690 $ 96,060,060 $103,314,524 $108.116,328 5 106,593.734 $109,214,618 $ 95,365,115 $100,105,424 Operating/Capital Reserve(Increase/Decrease) (4,531,859) 4,550,686 8,337,849 9,883,370 7,254,464 4,801,804 (1,522,594) 2,620,883 (13,849,502) 4,740,309 6,819,057 ENDING CASH RESERVES-S $ 73,288,155 $ 77,838,841 $ 86,176,690 S 96,060,060 $103,314,524 $108,116,328 5 106,593,734 $109,214,618 S 95,365,115 $100,105,424 $106,924,482 Target Minimum Cash Reserves-One Year of Operating Expenses-S 121 $ 66,109,197 $ 66,608,450 $ 69,126,028 $ 71,650,615 $ 72,459,585 5 73,290,991 $ 74,046,774 S 74,826,547 $ 75,626,087 $ 76,451,388 $ 77,295,648 Cash Reserves Balance-%of Operating Expenses 121 111% 117% 125% 134% 143% 148% 144% 146% 126% 131% 138% Cash Reserves Balance-Days Cash on Hand 121 405 427 455 489 520 538 525 533 460 478 505 Page 335 of 1707 ES-26 •t Table ES-3 - ',i• i`�R.1,V: '2.tai.:1,?,a,;� 1....i] City of Miami Beach,Florida Water and Sewer System Multi-Year Financial Projections .". ': -r . .„. .1.; . - M(IYnl '1*' t e . i;1l tical Year EOdhtg te'pt tuber 10; . (..Y;e l,tililm911'y -.,...4 013) . 2U20 '';Y,. 2021 ` . 202 '2023 '2024 ' 2025 ` 2026 2027, 2028 •. 2029 2030 Monthly Bill and Rate Affordability Average Monthly Residential Water Bill(7,000 Gallons) 5 28.52 $ 31.05 $ 32.27 $ 33.65 $ 35.06 $ 36.65 $ 36.83 $ 37.02 $ 37.20 $ 37.39 $ 37.58 Average Monthly Residential Sewer Bill(7.000 Gallons) 80.17 81.93 83.57 85.39 87.31 89.22 89.62 90.09 90.49 90.97 91.45 Total Monthly Residential Bill(7,000 Gallons) 5 108.69 $ 112.98 $ 115.84 $ 119.04 $ 122.37 $ 125.87 $ 126.45 $ 127.11 $ 127.69 $ 128.36 $ 129.03 Amount Increase $ 4.29 $ 2.86 $ 3.20 $ 3.33 $ 3.50 $ 0.58 $ 0.66 $ 0.58 $ 0.67 $ 0.67 Percent Increase 3.9% 2.5% 2.8% 2.8% 2.9% 0.5% 0.5% 0.5% 0.5% 0.5% CumulativeIncrease-% 3.9% 6.6% 9.5% 12.6% 15.8% 16.3% 16.9% 17.5% 18.1% 18.7% Median Household Income in City of Miami Beach(Monthly)[3] $ 4,446 $ 4,490 $ 4,535 $ 4.580 5 4,626 $ 4,672 $ 4,719 $ 4,766 $ 4,814 5 4,862 $ 4,911 Percent of Median Household Income(Target<4.5%) 2.44% 2.52% 2.55% 2.60% 2.65% 2.69% 2.68% 2.67% 2.65% 2.64% 2.63% Fnobtotes: I I 1 Historical Operating Expenses excluding depieci:ninn are shown as Inllrnts: :i -.. :.. • ,: - .:...> . .. .; _;*', _ AliffiRetsit.tlidta Se15te1uliet`* .. ".• aYt wtn+l" t t, ,y . , Expenses 991199ary. 2035 2016"'r, ,'2019 -2018 2019 t000,11 Total Operating Expenses $ 56,906,238 60,864,881 66,850,251 • 61,690,288 61,407,739 ,G.roNtla Pito Percent Change 7.0% 9.8% -7.7% -0.5% 1.9% 121 Fitch Ratings einslders that utilities with the Saran_est financial profiles would has e cash reser a halances equal to at least 100'!::or annual Operating Expeses. 131 S53.348 median household income per l jailed Stales Census Bureau lu n to.census.got 1 dicidcsl h5 12 months..\maned to increase M I.11"i.per sear alter f fiscal Year 2020. A, w $'isedl Yerr i;n+ll, so. 'Alai'30. .. :' Pilllitiitall mtael , . - 2629;` 2021 2022 2023 21324 2025 2026 2027 , 2028 2029 2030 Additional Full Time Employees(FTE)per Year 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Cumulative Additional FTE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Page 336 of 1707 - FS-27 • • • • • • • • IP • • • . . '''',„;'..,t,:" P ,< e e 2'a i S.' Y h « £ xe,. 1t :6c•t 'f +a E t /f .� ks F a y is t .r' .0 d° a +i" r a.. m•C �..'- i-.,a. a.n ,� .�&t' •� 7•1":"''''' - •i a ,„ :.s,S, tt+.,<:-> ,k 1 > ,g rix ,..:A-4,,,,,,w, z r '" z t `'� t iv.. ' '40:- t :5�+`Ft`•k ,`4„a.. >;.' ''...,?;••,r k a,.3�!.�o;#'.�°x '':,''1�•.",;;. .4 .a,` s;c3,.`Zvi ' ; y#:.L -�F,.r -::7-.--.....1.".",?,47r, ,,�.-•;., 7` ' ' n f :.,:i41';'''.--11...'- -s y,,fi,ix,r. .e T..x..:,wr .c:••,: •� ,'utr }, RS �,is-:cr, �t a't :'r�'. ,x ' . ^F: ;i;.13- p,i A�'' FT_ '''=r•r: E. x • � F,..,-4,4„: ".."...,:',:-....W Ykr.' ''' ,,. s'tw.� b�r�' ' =..:&.•`,t,:"• ..?1 :'" ,,,'!".4.1",..y.:;-.74r=^ `tn., .+r y..f.....:. >P ,,,t ` 4 „�,1:41#:- ;t. •t!, -s ..tr' '..t o rN 2•mta 4 .3,Sa_ts. h rtt . t y,:»:';•= p.°-`dye .} ia;,,�f, s x,+ -^':a s " �'Ba , . ... i` fi'�' t •t:,-ti.*' v�.,,"`Js N�- "2r yin? i?11 +'T `-i "`" . r.t. R Ohl :,-r, ":3ti'',', 4��",, ,, s-, i. ..::.. "�,'-r.,K6,,?1- ..'.< 5 -.^7, er 5-.tR",:+ a ,;, *,X,"nY�;„r�, ir•-.r ,��•,��, ..�E,x'�' X.. F .�>r•x.•r:i `�"s,•,� ,a_ ,3""f �"A-r r u�"-'�n��:.,r'�. �G "-?.t.5b l , ."f±� � �,,su.Y: '°.:-,. u - a 0F't ,,-..,..".......,....--‘,37.^71,%' ' •.' ,= Rd fY.!' •s a- ,q- ,A e�''-.a- t • _ r ''�-c z ':.:71'4:::-.',. udR,,, w ° " ri x :'rfh,,t ".y.`,;: ,.'_�-`-a s •Pre ' `1.:47� ...4"%:rn• s"' 't> Ai. yv -FF,..,,,,„!,...-4,r ° '� '''..-' 5'.'-•-• ,-... .1-‘''' wt '7 }a ,... tq--,,, ra a'."., r.-r` "Y-s z Ei.:- .,'...„ *:,, 1--�€` a .b,.. ... -,x,0. .,1 ''';'.'4''''4,1:'''''"::'''''' ''.4. "'''' �.j_ y�.6 '''''#--.......' '�sts ,1 6S- 1,05 'Wilt't. 'ts.'sT %� xl rr4t ri -n li x - x"• - rq-,*: 44. a'i.• 'iii ,...• -.i•,,x'Sl"'^ y s�.3 + �} '�,� '_a?ski ,a;_�.r vu rf> f q _. ,J,a.4,. -icIttrmx,;yr 7.1hil.�,..4„it€IrY._T._ ,.:„....i.,. _ ':-t£a.,.. .. . . ..,�• ,.. ch'h x a, •:: _0000 Wit. ;g• ;. ,,� :�'` A n i ..v1.11 n 'r'^ ..sr.6 _<".4' n - a-_.-_ s: 4111"4'61W''' 41` >'�s 4.fu:- •ct:Ea3. : a :-c`?'Fc-•:n?,il,. L',uc? pti. . ;,.,.:.. ._-`�'F_:,..:z._ilii,... ••rte-,:.�_o a_.-�:`•:3�:£,9,•E,:�::_=::F;::ir.:=:-a ,01£:00 _{�.���`.�`':k..�s.. .-�?•. ,;_ :�„r=�:� ' ..€._.. iai!�:�:v-`x�•::::� ..�F.. . -a:- •1.r =m:"::''' v ».._r.v, ___,.,R_. ?¢E3'r,''-11..: ....r._..: -:3;L ve':!'G•iRl'.-. '_v,:•::r...-...r _ _ .. ___fil Ei:c:.::_.,c'mk n 433e .tri.::i' ..e.,F..i_..._...`_eF...- u'rx -u�:r.._iz:.._..+.� .:.,_ ...f-ie_:..!.,,. ..-:!::r r P.�':-r= 3._. __.._u�.t_'.. ...z"Sfr•':f'i._a... {� ...Ta-2::"•L•n:er: -- i'_T!u:=e.,er.. _ _ _,3815. :.f,..3.?.is ,. ,£:-a.._.......... x_,'ii�.i..u..0,.0000 ... :,E_.r:- .:::•-v.�.,0000.f Y€l afi. €...._€,}fxxr�.....4.... :-�'Y.a-:r�..' ._-vF:.;i:_T:+" a4Yasi;�.. _.a a�ira:--:-: re =i ...1000. <.••.. ,._.ata_...... ......._...._. .. -t.�'-. _..:,_ilii. .,ilii Jn!......_.l' axP,0000_. ..:.....�.<.. _ ,>i._. ...._....-:a•c':-:: •�f:: ...._.. :.},rT a::� �:ras•�`= - ...... ..,-� 0000._ - .'.•,.._.A,.,:.n..,a.a:... ., .,,nn...r...<....a._,.r,.,T..._.., .H._r.... z......1_n.,-_..........1.. ,.._....... ,.. . . .�_.._....,,. ��_Ean C:,�..__:. €.,. _>x��i??'!:!!!,,� ..viii..•- . .ilii_ ..__.4.... ... &h[ra a ._..u_5..._ii.,,, �...._.. s_._...s.....,_..u....a....:..r`€r.... ".m.._-=...r.,... r... .u: ..-.ilii.._...7??c1 _ - rift =:l-"zr,' _.. ..�:.. ..r. tri".....dn.._.__-A.vi..,..xn_".. ._,:.s s.. _ ..,. ilii... .... .............ilii .....s...,v.u.,..s_a,.....r......,,_.5... ........_....._......_0000.. _...._ . c.:o:: :- ....k_,..f"uun:a_3?!:€:::..., �m�;c',r`r':: ....0..s..=,:Cr.._.... v..."....._........a...-•n ..m._s rias.-.i..0000." .. . �€i .ilii. 5.....s__...._ .. 100.•� _.....r.:•vEr1 ....i...._....v- .. .r ....._v...._.","...s..•4`2�sv.......... r..a._ ,..ilii.._........z• _.v.rr............_. r._._._...0000., _[_.......... .an^.J>_=:::&:::::5!:!ro::nun:rt• ilii..r z f. . ..- .........._,..J. ._...__... 0000 .3...�,00.x._1. 0000 0000 ,.s.........vu.00,51ts......a.:. - _-.S_is rz.=_as:. r.._ a....... ..........a.".__..... a.a........ ... .n...va.•.__rg,.. ..r_:.».... cra::::rr,-r..r...;:...._.r_....".."._. .."_........... � .-r ...._ .._..._...-w..a....,3 ::. ...E_0_.....r.,:.......a....,... _ ..aau••:ui�:S.. a'-x•..F•:rr:.,_....,..ram:. srsr; . ._............. a._ .. _ z 2,.::ir"._...r!..r.._......__..._.,.a...........:n..z..0000 _. a _:.r�r-_ _"3.:3 ilii.,.....�.-.r_:,aa:':z.:' _ _ _..''�iW,i 3F. _.x . ..,".........01.........__41,v...ns _. __.,.un_.......".."_....=Sir... ...sin....,. _v..,...!.............s a_7!:?:.i;...:..::::-ri pr':i'.4: :i_-i e,•.. __ 0000..aaf.€......a...,s�.. r......._._.r......s...H.ra...__.,_...__J..... -.. ._.. 'r"r..:;i}"ar c ..."..., :n........_.... .. _...._v.................._ ..s.....,.£ . ....a:ns.e.,:,_r_n.............. 's.7z......._.:_..,_.......s..__.a.-.a._..,!s......nr::..._..-_.._ _q.:•�av_� "' 0000_:.__ .z,f."_...." z ...._....a......_.... ._"... ....J...000. ..s _ ._�... ,- .. __�..._... iz ,..0..E_0F ....._.._.. .... .0000._0000._....._..ra..a._._.r�f,.h r..._..,.a.1000...,0000. ,a...".__,..0000.-___0000"._.._ u...-_..• .. i..:a: i-a:......?.:._r:=:tiiGiii!c.�•Ff;r'r...r,.,.."4n.:�u.:>£: .. .aa..._ 0000 z._......__.......>'rx._...._.,s1.a,._.r.=.a . . .. .. €#:i._v:z.r...er....._._.:,.."v.._.............__.._ v:. ::r'::}£?;^_:-€::r:� "- ,}ilii. - ..a_.3........"......,,....r,.i.u._.....-. _ < ._....._.._....+....._.ua....._ :?s-.a"u__v 0000,...�£,..._u, a,........,s.._ ....a_...._-s...d........_........__._...._........._:iz� ...-3'S - �3r_: s....._uii.. 0000 d._E.".....u._,.v..r...,r.--s.......-..., ..s....l 000.:. ilii .,c:.. ............< ..,..z n€...Y..n...... ._..:.[•F:...... - - - c�:r+'.`.f.',yn- s..s.r.._-0__000. , r ._...._.r"..;_.,._.L_u,:...._.,_._......._..._......._ ...,,._v.. .a.,......_ . 0000... .....,..a."0000!.a... r._.........1000 0000__� .:,.:_en::.:c a:r•- - - .ni:E:.._. .;u....s.._,a,.u..0000..ilii--,. n -!. A.....:i�u4_m.u.1, i v.,., �:,..... ..._.._..,..-_. .,.y.: ilii1000.. .__vav�a "'• �'i:£v:!.::i 0000._ ...... ......a....... ..,n... .o-3._._"_:n.-0000.._ ,a.r.._u.:.:ilii. . _m:-.}>cfii�5!a.�.}n s.E.. ..a.veL.........._,v.._..n 0000. . ._._..: .........................._. ..,........:_-s.. _ ....... .- 1000.,.......__..r.- :. 0000_..:- ......u.....v...0000........ , ._r:-•_srsc:-..s-rc:-_z:r..::xc-n, ...a... C, i'ii:' ?€s::'ti'3�E_z 0000..r.1..._.. .-. ...-._'...._.... ..,...•,a._l.....i•..........a...• . ..............:,i4,,...._.-_,.._u...._._.-.__E........_"_... ilii. v.3 - a.ri,,. -,,I<! ...-. ......a.,0000_...a." .. ...x. ......_..............0000.- ....,....-,....ev.a,......C. .�,0000 .,-._._......__. ..?ra_'0000... _ilii..,._......_......." ....... .�. .a r3:ui - :'........... ,+a!_v._a......,_. ...r. .... ...._.........._.._.._...a........ ._.r.......v.L'an•:;rY.....::us::•.x iv, fii5c_.... :ai.. a.iv.E..."-'--__. .e s, _,a�,...<...._.....................__.:i+...r......na__..__......,........ .. _-..a:......_:>~....._..::_.._,_.._.........._...._ .. - :`"�,,R,_. ._........ .._..-- ---.__..__0000. .__.,.'..._.... . ..................:.. ......._...._.._......_.......__......_.,_..._...........r.....,1000.- - .......Ei.__. .- .. .�. ......F_-._ ...._.. . a.-.._.._.tar 0000 _._..s....tu.+..:.1..n..r._............:Yez._.....sf.._._...a4...:,;a..,..a _ ....v........sn'___...n.- .. `` c v.,_.._.........r_.......€." .:ilii... _....s ........_:5^?23i'.•:ci 0000.,0000 . ..a._.....z....,..,..a...........: __.-. - tY.-_ ............_. ........a.._.....v_.........<_......_..r....ilii..._.. .. , _ .."0000_....._.,.><.c._ ... ... 0000 0000.....,.._....:.. ..s_....z_... ........-,_...s-.�........... ...........r.._........,,._..'._..".::::....... .:..E,:la_ >:sE:::_r.:o_=.:_=_!i�:::0110-cus..:�:: n-.....c..... 0 i„i__ _._.... ..e._.....uv._......................:.-1. :.......1.. .rMS!£`4:5}£i,„i ...._.._............... .........................,u., 000-0000...0010. ._ ...................- .- }..n::a-•r.:._.....cuor:.,,..--- .... ........•.._..".,.1000..v.._..._......,..,....,... - ilii a.. ..a......!,i_.•s....-s 0000 s^, _....... .:.f. _,.._ _......,_..a'.s..,.....a:a::::::x::*:c:r.o-.:...r...: _•_ ilii __T:!l::n:-'.ir:._i:?'.::::: ._..r...-0000.0000.. .., .. .E _......_..-.-_<......_.. ..........L_.. v..,._... ......'c.-_r....r..... .v....._. - ..n.........,^.......-......._:...s 0000 rt __ .. -.........._.._..:._-0000... 0000.. ..._.v �:...- - ....,._:._..a..._......_ .. ...Y....a..._................... : ...._2........... .._• ::_...............u:.._.....:....._..1000.. _ :-. '-r,:..1000.. .._....<._<._.....s.. ...E......._...__....._..... .. _ ..., .:.,.._s 0:000.-a..._. F." .i...... • ............ ......-, _ 0000.__.ilii..........._.._...., r......z t r... S ........:."..._..._r_..........................000�............r,n_....,1000_.........,.............__ 0000 ilii .......;.: . _ _ _ 000. _0000_ ,v.. � � -.s.........._�..s...._...........s...........:-:::::::ni::.s::•rtr:ir:-�::::.:.uu{kic€€e^ ii`ifcianrix`:i"= ,..:... �::_!r='.. .,,;Sa•.xs.:o-} ;.}.:::::x .v:.n::::•-:•r•, :...a.....k.1111:€°- - 00,00..ilii. v:r::ur .,:::vn._,:.•• ........_ r::•.»0:11..._r- 0000_._ 0000_. rilc:..::.s�..:............ r ..!.".i . .. _0000:� .. �-:0000.«. .... £y..:Jr.., ...,.,.,::_.:u:,:.,:..::::,.J�:F -- .E., ..r. r.. _........ ...:......................,,......:!a........,,,,,F 42,,....__,. ....0000 - -- • SECTION 1•; •• • FINANCIAL FORECAST • • • • • • • • €41 0000 ,,:: H. 00: :00. 0000... . _ .:: : ::r _ . _ _ 0000. ...: .ilii :... 0.0 :: :::a ._.._� :.... irr 0000. 00,00._0000 ..._....w 000:0. .� ..._.._ .. �...... ... ...... �-: _. .................. ..._._.. .........0�::n.or!....11,1!,:tri __.. -' •::1_000_........._ .._d.. .......•..<.s•:v�,n:':,n.:.......ilii._"__.....:::...a......" . ...,u:::<:»= .ilii. ....r J:_...._. ..0001 v....._"0000....x...,:.:..... ,0000..._�.- � _ _ - _ .......L..,..rr:0000___..ilii 0000..__._ ,..,a. ....:r.:x:5:r�:::ilii :0000...: ....v�...:::...:::0000.. .£..x011_.�..._:.v.:u. ..,..__.__.._........-..as::a:.u:c::o::._,_._. 0000.. n:::n,n.s_ � _ ..ilii 4001.. 0000., u%r:;.^. •_.. v,... ."......�:::_._. - 000 0000.r. a._uEa: z.... ,._ .-r_......__•__._,.......,..........e..........._...,.__._._...........___.......__..__s..;:�:._.....................a�rz _.._................_E::a: zE-:S:e:rer..:.:;:a::�.-:_::asiui�?iCxrj';€:(ivr::::...:c: ,:_n'f'S�.-�?qi5,::-n_.r.! _.ayr_...,:...:,}_.is.,.,5.'.j _ __-.,. .. ......_.....".._...._._.,..-..._v._._.._....._...............ilii...>_F.s.:...........__. ."0000. ....__.r.........:••ax:c:_n;r::ur:v. ....-._i.._......__,n._a ' 0000 ....._u_..........0000. s.......................0000 .. � 0000.--....la:_ 0000.. .. .. 0000._..._."...v:_..._... ....,ra,.,..._v..0000_v..." ... . ilii-.._................... ", .::�...;£.:...=1x•,r�-::ancx_ :x:.:•:..:..a:_cr 0000..000.....s.._... ...sz.s...... a....S., .,... 0,0.0.0 ...,r.s..........._,7'5,-1111,".,...._..-..._....,.. .n...... ., ria-_ - _.E,u .. ..a."........._,:.-..,... .. .... .. .....0000._...... ..... ..-...._.._.."..............._.....a.....-............_.......1000 _-:_.y. s..:L••:u' - .._ a.......,a: r...-vE,_. .. .._0000>_..-0:000.-._.......r.....viiia. " F .u.._.. ..., .. .4. ,.. ._ ...•, a......<. _ �.nxi::c.: • vm..........._:::_ - . ura.r..1....._a ilii s._ .. ...:a__., r...:.v,.-'.r............._..s..0000. _ 11_.1x? ..."..: .n.r.2,u.......a.-_.._...._..... .......:.... ..r._.. ."........._....�..,,s....,n.,:vau1•, - £i£$i�. .. 000.......a...,,. ,s.... ilii s v.............e......r......."..us._...__, , a... v _ _.....,.n..........a.......... 0000... 0000 .a...._..__'-...... _,- :�:...:_�x..,.,_c..."', _, .•iiir ,.'iii�6= :..£,0000........_.,a ..:. : .�,•.,.M3,�.,:..1411:nn ::.,- ... : �.1.. 4 .._..........._.._,..._0000.-n .':'-'-, �-00.0-,:r.,. .. .::.a "i..E)'E _..S... -:_0000_:. __ Eli.:=.i:,:: :.r_._...,0000 E..._3..._._._.._._.: �._. ..f.�i ..,_ss..:. s ssrr•r.: -.�r:..�.�� ilii_ti a _ t.. .. .._...:a,.z...,..� r _ 0000_..............._..._...,ilii..:..,.:ilii�.. :..__... .E :..a...:........_... k - a,•t: .::._ •, 0000.. .,._..__._.... .ilii_ �n s ... 3 _n.� �..vv ..!0000 01-10 a_:r r.....__....._r..a s.u.-...n.......4..........�..>..._ .._._ ..__...__......__c:.......,u..a..e..�.-� r. ....:..ass r..[:':":s' - 4^^r�rr.�v. .....:'_'.C.-c.,.__.-......E. .. : .....-._"_............ tti.s""._. ...:v.,... _ '- .ilii__...... .. ._._...._r_,,...._._.Cis..,....r._ _....:.c.._..._. _ 0000_.ilii...._...._.0000 ..v. :.._se. ..... r. ...._......si-r_.._0000 a..,.-_,...........__.,�............"_.._z s.s.._.. .....3 .r s 0000 ilii...- _......Jv....via...._.. _ ._...L..:f...t»£!'�.:r�u:r - ,vr.&.r. _ilii.. . ._1.'., .s:i:r.....ie o£S,J 000. .".. 4..,_.a._.r.s:...... Fs�,.,"ua ,.ilii..._v...a. h. u_4u_...a.r_.. z. _.....,... r ._0000.. 0000___ .0000.-._e ...: 0000 ...,.,..,_..r...._._......._......v..,0000 .._uv.._....;'.00,00..a._.._._ ._-..ilii_ s....:-r.. .f•�"Js}m:u: ..._..0 = , v...ilii, 11._...._ i..._l...._. , -£c.,.....:....av............... ...."...r...._r_..__-:........_.r.,..ra_.......s_v...s--afs.un::':'i:. ,.Fr_u::icc}::i?,::.:aas{:,.L"0000 ..ilii 1110.. ..6 r ._0000"._ _...._.....a S.a..........v.J.v.,111.•}.1 1.s.. _000........_a._.._«...._...._r.....a,r__'... .. __............... .a_..._h.v......s."r,.1...a. - .{., ."_.._._....v.v.........._.<_._.., .. 0000....._,.......a.ilii ..._..._.._._..-,.s,rm•.0000:s...,aJ......_,.. .-ua::"........ ......:v!:^::-•nr^•.;;.;.-....: :a»::uu-..__e._ -a._q...,a,..E:•'rn•:::_aa._ ...,..an....w .•.=ass ....._.rte.,. . ... _.,.sur=..._ ._a... .._.. E`£. , __-x>4.... !€--r.7,,,, ... ..f' a 0000_ r.,. s...pp _.:_...,..o_....u..".m_u...:a........_Aa , 0000,. ...r. _-__ilii":.I:;::::-:-:::-:nc:L?:�u:n•a._........s_.nr x✓a .k sr.-:_1:c..;--::r-»::r:ir,�,...r ec,F�n sura... :..,# .,^'r4 s._...........m,an.r i ... .._000:0 _�•.� �l.,":�iaiit aSt.,.i.._.i._......... ._.,._..,.....s.........v.._ ,a.zcr.s=_.`}_>""n_•__. -0000.1000. iu_v"_..."ilii.... s�a_0000 u:s„a.". - .F x- ,_,s a.n ilii ...._,__....Lri._ ....._.......rf_":-_ .._}._ .,.a.C...r_.... Mrs•...:._....... �...€v. _1100•?. r'i,.-'�.- ...,...ata....r..lsmr - r..,1000..."...r.ilii.__ ..0000. ......r._. _- ... .. .. ..F 0000_ r. ___ �srw•. s._..._s.._-:._...n.a.. _ .. i...1._::;-..........a.._...i..�_!._ # I££ r,._ �. ...__x,. .r.•�.._.<:€:_._=r_......_._....:-.t:_...__r....,....s n-_.:._,�,-'z�a...�._,:::£:•r:�•.�r .._._ ... ._......t._:_.......y_ r� ..n€. ._..:u_..S£_ .i. ..__._.._...v, ..... .a_.,.0 r._.., r ..r...a. y',- =!'_:urL-:n r.•:+ - . _.. 0000 .. i .....z. .a.,..f .__.__-......_.�£..-.._o-_a.__....,............"_, a-.. r,..........._=ai..:6•-sv_r.. ..-e..r....sL.t. ,-4i:.J:rsc.r,:rre.e_"0000. _ ilii.. 0000.. ..._,., ._:,_�:ix!Y. �a.s, r.....::..r-..�. "€ .._.._,.:.._.........,. _.n .:....,..1._.... _.._... .,'a. .._J._a._.,.n.rr-... .E,.":.ilii..__. a:rs n -�'�i�r"':ai<,r ,n:T:. ilii.."_:a..�.aa.r......,a.__, 0000-0:110..• €*,:e?:a,fia�::n�.. ..._...:�....,.3.,!_.11=.:r`t...•.�_. . ..__a:... ._r;,...>:..... ....E._.. _.a:r..,n4,... _1.. ..:.Eh a - ::n�~i:,•. ,,}s ,._._..-!_"..__..>t'... < ..._.,, 1.r_..<_._..._._ .E 111 ...,._.,.., ...x. ...a_...A.._v......._.. -,,._"...til s::3Er:n:€-_a...,.d}......iT4'_....,-i..>=...._.....r-.u'£. ......_fl...uan... c _ ,s.: .....r__sir . ___.....u:.a.. ...:_t"._..._.a._ ?v.._•::...»-_._...3�:. _. .s-s r_.__ _.."... ed 0000.. .. .....G...._.......i..ss._v 0000 a....._n..a:._.,...._.0000...._..,.100_4 _ ._ _. ..........r... ....r.. . .___. ,..s .. .as._ ...0..r:a?..4�.-',,�:E_:s:-- .s5..33r.. ..._ � :..ilii 7. az...a ...r..._._....._._0000..x£0_.1."0000 : _S_ur.......... ._.via....n....c_ 0000.....t_z....L.........._vs__.F€a su-..- .._,. .. ._ ::r__�v.11..11 .,..M"a:f:+?.!=F""•a- ....r..."..s... ,0000.,, ....v.`"a......n..`--.s_...Fa .._rut v"__.ilii 0000_0000... v......".,__.... ^a_-v ." _._a_._v.s....__....... .r...a..§ n '#f."._... ..a,-,._-_v.-:._ _.5... :::=a.�'io•nn Ss:,:a!v._:-..ilii_us - ..f_..,€' _'§'c:ci�r:r' .. .........,.us .s._..r. , a :v.........__._a._s.,.,_st 0000.,_..0001..1_..00.11....6..,_. _,.3..,,.ava ,.__u..-..,.a"1 x-...,_Js, ...._r...4%...r.... ._ .torr .,...._s.._..3,-. • ..d i". _ilii !.._ .. .w...."._..,.E..__..a :i ......._......a.-..-_ilii.._ f._-r...,...._vc_- s _*�S _,ilii £.e:_t-sf-... .,._._._._...onus .._L.!�na_s._•1;xts...,..a r"s.r.__!._ i!s_=":i{rs... ...:.�`;: .. t.._-ilii.... _.. €r.. a,_, r.. fr a:n-F7:u_... .M.. uas 00€00.-s..............as..xf_..h..__...s...._s. .......4?� ..-._1100.: •y._.o-�m c:rs. a ilii r.0000�..:...r.:r- x�.... - _^.I._1_.v }S•�3}fi;u!`�=.:. ... 0000 s ..s. v_..:�s"r..Li..a.,aS,a .....s_._._?--5030_sr_..=t....."_........_.�.....s 0000 e..,..._........_. "-::__"ilii_ .a,'4�u_ - - �:=F.i.r ".. ._...s.... .%.3.1.7. ,. }.. __.......__....u..a__.�.._v_axra-._"..._"'Sa.�via. ,_a._....a. .. w,+_,.....s�. ... 2re ..... .i7_.::eui'u+"r.'�-3.�':n...v.�"£;::,:7F.!'J,=u}€" '�isr'6 - - �. ,�_ r_. . a�E r.. �.�a�..r---......r._._..,+<:_ ,_ilii...:_........._....__a_...__.. ..i liar r....e_.. . ..._....�-i�-__.._.._�1,.11-;11£.r- r;.,..::,:,a.=-:'�: _ _.h.. ___._...._ =•�'?:£•}a. 1.7,:r•�3t=,_�; h:�,r?r-`rte"" ._ r ilii-ilii._. _.a>;£ .. E:..._r:::aar,`?•:,•_€€,0,000 .a£,..a 0000_.r........__.. ..__-., ,._a-_........ a,....__ C.�&5..r..a,,.....:c-.,•_nra�1011:r- ._L.. . ;T_=!r:E,..:•!£.:,'.„���..., ... .c _ fr !>L1r_n... _, E _0: 0 00 . Sl s£.E ..3 aa._3<...i.a_..S.z-us.._::.. ^-,cs_. n.,_ _.a_,,.,,...ns'S .S?rail::- 3n. ..aas-.c:i-i�i- °.€S. ....h...... r..rsr,_£i_r?er.._rc,:v:v:ci L.r._.-,"._. ..5 '`+a:-h:a'`.T •. :, 01^11. 0000. :Y _0000..£<.: >Y£. `l4< `�_ _.I...::_.�,.a ..a.. ,.rza.>v._._..-..n...�..:-...r:.r=. s..a..,_.,,.- <w �- ��-.n1:500 }.::!n_.�:=::r=`_r1-±a.�-1:�' ::_--_ -a _h . a. ... L._:Ea..... ......_�.... .5, 11110000 ... _._L _.._ '..i.,c ..._,�,..._ ,.." . .- ,.::5: �-<" :, �-_a-,-.,:=E£��:r.•,..,:., . f'�..... r:-,+.;�ia;f' `3:�f:;:a::€,!i -- _..,y:`:t�-=" !�: ai.�.a,._ ..ilii. ce a__... a . ".4_ ,...".. .r...n�#0000 alar•_-aE,,.:._..>r�x__...�J._.,...a..s•&.Y h7.__ ,F -.E� '�,: ,f.:.-r.�.•,f�: � ilii `.-,,::!=i���>•_3.;��a.:=r•. u= . _�- 3ra ». .'£E_._.r T_. ,.,m}1 .�._... 3€11 .. .:..........._...---"-``1400_. n;iih ?rias:;•_:,:.,: er�m�:s:._.-::.>:.L.,...r.§.__. ,t_,_:<...,,..4.;r. _.. £•:. : ......- r.. r:a,_..:•c.:. .x._.. _sv..l..a."u1.��r �L ' �,E •Er.. .r_-.s.._.u........a? ..1....-_...su•! ,=.a 0000 .,... .._.,..a•_. ..._....a ..s. ..r .. r.,.;.r,,..,�.:.�.__....r.................._....-__. a. 0000 a.,:::00,00 n�.. ........-,a1r:..,.: _?a .1,.11-_4 3_aa3 :=_ax:+isxE•'.a.•-`:''.. . •:r€:!. 183 �-:5,. �:�:;3==}f£�` a:,`y,-,T•sE,'Sa,��..Fr:r}.,_ _00.•11 11,10 ... J ..€.;ah`,. "r.._•. a•S::.S'�� ..s•0000.._. _-. ._ a r. ,:�s:.. .•p:..n.. -:,..J�.,a'wr1111_a£t::T,.},n. _ it.E....s L- _ .._13.11,:,-�ER�,,-r..-r 1;.3(h!;-.yy� _ _.�r.;:r -__1 r >a r..v Jam ... I>..^ a 0000... :,.,_3::� ti C.n>_,ata ar,._g-ai,:` !!:i:3?€.rx:r.,.-,.z. r • r .._ .e.s.>. ..._rl.^.r.�.. .s. .f-�r f. !z'.�r?..�-.ilii .<aa �."......._._..!___ "..�J�'..__._!-JY.._.._ ..,._ ,' ='n!:t:::f.,.,s _a��'Fs€:�sn_;:�r•1;.,}_.r.-. � r.=Er-::- ' a'��;= •1. _.f_'s:E r__ .:i moi. €ar,.:'' . ,•_ ...air. �,a.:._::1:P"`'f-1. ..1_.}_,0;,;000 _: '..'±f:=,. _ t,;kLa`!t fIa,Lxt;x.? __=kms. - .' :fiii:::a;£• a.•t:aa :-_:Air3#_.r• !r a .. r 4,-i , _a-, , 3. . r :_ 2.- r,,,.._.lx raf':'.,!i*a:!r,•; la.`: u n•- ;s t r_ !•..iia; :-111!1 S:' ems•.._ n,1-=;, L=°... ss_a;r�;E .,l a-r.� ,"_ :_s. £. .••�:r..;�"3��._+.. _ ;,}�.._-i': - •a -.T5` _ _:sem....�y.,.. :I{z;;c--�.»rte,-�?�j�'=. .'t�!u� ..a-�•a�=gi!: _ :.a, .E_ g.�, .,:sy�saaa y. �'�`�::",'•' �{• ."4 t• - , i `5z :=s - `•7,' a- J £'+'u'�s� `st x , € x110 • - ` ' "` 7r 1 �' r°' � PrP -.'f: ? : y= i E a ii , Sa ar..,,,,_ J �`a��� l` •, r-i=: h L=',,_ 4'°4 .b>� x...+. lY §'"c g-i.,r _ ,s- -cxsir, e :L', ., �- .,,:,s -:1. 9- - .,-d ,,' 3'• -f' ,+.F t;V. e v,;•, '� . F.?`?''...,;t'. Wdi -.;;•..ta` .y. . `4 "Zf E �Eeys •x cam-t.-m• °.�"'x2 1:411 ,,.,1, ri'. . k,! ,?yr t a-y"5i l iu,.� F 1:-rix •::.s t.•ET fk tea"r :*: '1•s-tss;•tee _i .J'.,,H ` >� > 55;u t`h'. . a +s.x ,..}e- .. d : +s '-''4r L. s.�' _ :�. ,t.n _. r,,. 1..:'�� G-ry,s>t,.:s,:'� „�. 're:..";xr-,-.. -:-a: '":'"�,i':a -;:::-. .r.:?- 4t r,�, .a;t.lt::.,..r, ,..''m a,+,'t_r'q'� ar KZji:•.. us'.:sac ra 4 „ c:5 _ •E,• - .:.: ..:¢iiia• J `s'•y .-. i t ff 3. a�E az.- ..r .^ &;,.s ..x-:r.�i ..?.�, ,.tt ,. ,�. �;,��_ $.�.'kk>,4?'�;,cYr�, ...�`y c r:.a Vit,,;,�,• �:v�arfi*�.>,<aG'J:m �r� : ..L"`i. - .>.ra',��., '��' �.>.i t.x'11" v �:i` _r-�'z: ,'‘...44,41.1j...44.'`--'±'..'=";,k' ry...t,,, i.�� ..r 3, .....,taw . .• F•4 a t•,, .ieitt l"> w .;., "i:. if ,::: .?•, , s � ', r1.u,>�7r-.n� ,N c'.,x ,� z w'i�l G ;ri`�"• ;'�;�¢.� :m�,:�r .{-*,s.�i�'S'•br�. 2. ,sTK"s.''.oy�..1 .0 ta.`..;T�itan,�ii;�•, q�?,fir x,:.�,a��'r,..•• {,px".�r,.: .. "';^„E+� Rsxr .3t ,'r3r aT.:::?'3.,, .i � �Y ASF,,1 ✓z'``F--,Ap "' ,. 's"�.. ,' • ��;tes� :' '.^++' r 4,• a`J; «, +;.t "Rt"`� ,r ifs•..,- %Sir+ ,';' F.: ...,:,..$4.,,,,,,,,..,„,,-;,.,.....--..,„.;;.-.....-ay ", .r k;a.v.' '--. "'�°3'h+ 's"d$;,¢;..� t '..."fit/,.eas,,( ,,, 3 c.y1 e. ro rts; ,,, ,# .,# k °k;- '' .,-t -e f `-:%-fi '., ....z`.'G':a .sd ,010 � n ,, ,:4L.. k�,,:1110� +�a.�,�� �.7^ a•-Fi,�rr�'x•§'���'� �x"�� 'a� �" �� � � �, '4'� �c�.�s..� .f,t .�.3 x -r r`K, _.:> a" :'.42 >:,, ri•e .r.':--4 7,,sJ s . .i. "' .. ,,,,k,.. : vIA,.. ,,VA',,,t,:,44 rax ,t.4,g• r. :i 1,..sit+ 'sn r3 �',k :e q t> �,h•%:A^ .K4 , :: ,",,,- a .,«n„'u n: ,.,rat a +.•as,,*:5- - .4 . 7.7: ,a 4 rt,7z l ..,.; -;,•.' e" `t4+.", 3' - afi4y.. •" a., . 1_, J 1•000s,irg,. a''rtFw"F s.. ,4, t; -,,, i k-*.a,,.y.,:"✓ ,�,"r,.:.S*7,•�r P. ., ,,,::: r. a.;.„. - '.Y',. `"-C7.,r, _,,,,,..,,„t'c`�''Cant' t yf UN7•r ':.c *wk..k""'' '`'` "'I, P• fir, 'e'ri s.«'''.'' -,"xP° .;. �t'Y_ d',r..43.: ,'i.., r' ,r 1...: >S s,,,, r 3 .x0 4Je 4` „3o- ';.-4: .;.7.- 4,: kpf .-y r. -s!<. .i. sz as>� :: X� ^ r ;. y>. C' ' ,+L +t•::-0,X15. °C"d..j r,. _.a' a: 'a".''''''.:•,:' � ..k, ,;t ..N �5 •.,� x , d.c^� 2. J� �. ..,�? rat �"� ' r '�,,sik�.,� Y.c t >tsifi £ -. ..z+ < .""Y"�•µ+ y.i' ;4 tk -`� $' •��ytr `:o. �* a 4{r z �� iS�.�3 4,. s� > ,,^Y .�. ° ��'��S• ",�'C-m �.�+.. G .y. '�X�,.` r �r .a�s. ..�•,s.a ' �`i`•><.., a �..,µ:s<r s,,, ..0t•• `vs,4'x0,t t �a; .1 ,3 .;;fif el. ..•-„e5A E r;n ri vu'�.1!aa 'a..,-:;. 114.•'5 7'" :• 5;•`,•:3, S i•, ' �:(�eq' _ ,s w t ~3 � a "�. +.of; }•a' s�c� •T ,�'rt n..a'ti��x',�' �L �* >s�✓ r r,. A., Xi.t{� •E,4 Sir k 3k,YT. a ny"%'H 4 yarp M? i -;i7 t t •Y' }i :{'.- i•� {d< sxY.^ 'R�Y 'i y,. 1 tIL` ' ?lPy'',•}l r ,} ,✓ •,- Sx Y 53F ';'-',:f4:4';-;:.•:::4; i2,4: •r Y {`Y.xr A-'. ,.:-y`,a1, _ •,, • •.t.. - U ttu^-''h..: xt' »ss 'Jii a''J at, .:.`I. '','.1 Y r"+0.0 "c .*.,: 9 r '4' / 3%F - �+PS}ems s5"� t #': 3 t 7� ya „, r+ '4. } 'f y :y,t � C V,.y'` tT Y'y 'G` -,. • } c4's '117;•, t; Y ,''„ +.r., c. i:"�. 3jh-1-'-,'.,.' ,,„. s¢`x.0 v,,,lit:: S� ..� T s�..�: C" •;ia. i! "`4..;5,',..,*••.,,,,-.4-,:- .,.. y Y Y +-e S•"F' """LAS- , • 7s Ak'•yL, f ,:y.`Y^ ,S"3,'r et",g.i b� 500'5, `� `"•x " sJfG i ; �"r,F �^h.sQ V � ii y i 113 Fl;• n�., x , 4'.....,...-ta? .re¢ .. :. _.Y r 3 .5.r�._ t y ea ,t _ _, r ili i 0000 .. .`t ,•: # sit . _r_ r .s., Water and Sewer Rate Study SECTION 1: FINANCIAL FORECAST The City of Miami Beach (the "City") is located in southeast Florida in Miami-Dade County (the "County") and occupies about 17.5 square miles. Based on information developed by the Bureau of Economic and Business Research of the University of Florida ("BEBR") and published on the website of the State of Florida Office of Economic and Demographic Research ("EDR"),the City's total population as of April 1, 2019 was 93,988. As reported by the EDR, the City was the fourth largest municipality located in the County out of 34 municipalities. (The City of Miami,the City of Hialeah, and the City of Miami Gardens are the municipalities in the County with larger populations.) J F i;f: i n g, i' f �..7 �'1:4 1 n .i The City's current water and sewer user rates have been in effect since October 1, 2019. On September 27,2016,the City Commission enacted Ordinance No. 2016-4039 that established the water and sewer monthly user rates for the System(the"Rate Ordinance").The adopted monthly rates as referenced in the Rate Ordinance include: i) a flat or constant base facility charge for each service that is predicated on the size of the meter for both the water and sewer systems; ii) for the water system, a consumption charge consisting of inclining blocked rates to promote water conservation; iii)for the water system,a purchased water pass-through rate to recover the costs of wholesale water service purchased from the County, including any increase in DERM Fees; iv)for the sewer system, a constant volumetric flow charge based on one hundred percent (100%) of the metered water consumption to such account (domestic use; would not include separately metered water-only use); and v) for the sewer system, a purchased sanitary sewer pass-through rate to recover the costs of wholesale sewer service from the County, including any increase in DERM Fees.The revenues derived from the application of the rates for monthly retail water service and retail and wholesale sewer service account for approximately 99% of the reported System Gross Revenues. The Rate Ordinance includes certain provisions to automatically adjust rates either annually to recover an allowance for the cost of inflation on operations or immediately upon certain events that would result in a change in costs such as an increase in wholesale water and sanitary sewer rates billed by the County or an increase in the DERM Fee.Such fees can be implemented without Page 338 of_1707 1-1 ... . Water and Sewer Rate Study formal City Commission approval (through a separate ordinance adoption) but generally are presented through the budget process or if conditions are warranted by the City. The following is a summary discussion of the automatic rate adjustment provisions contained in the Rate Ordinance: Pass-Through of Wholesale Rate Adiustments The Rate Ordinance contains a provision whereby the purchased water pass-through rate and purchased sanitary sewer pass-through rate will be adjusted without a public hearing whenever the County implements changes to its wholesale service rates charged to the City. The pass- through adjustment formulas identified in the Rate Ordinance consider the change in the wholesale service rates adjusted for the fee paid to the DERM that is based on a percent (currently 6%)of retail rate revenues billed by the City. Automatic Rate Indexing The Rate Ordinance allows for automatic rate indexing of the monthly user rates to account for general increases in operating expenses other than increased costs for wholesale service (which are passed-through separately) due to inflationary impacts on the ongoing cost of providing service.The index applied by the City is the Consumer Price Index—All Urban Consumers, Miami- Fort Lauderdale as published by the United States Bureau of Labor Statistics. The rate indexing formula contained in the Rate Ordinance adjusts for the fee paid to the DERM that is based on a percent of rate revenues (currently 8% as discussed previously in this Report) billed by the City. Table ES-1 in the executive summary of this report shows the existing retail monthly water and sewer user rates. A copy of the Rate Ordinance is included as the Appendix to this report. . ., 's` E. moi: '. tc+ ; - During the Fiscal Year 2019, it is estimated that the City's utility service requirements included providing water service to an average of 13,478 domestic and irrigation water accounts and 53,272 water equivalent residential connections ("ERCs") based on meter equivalency factors as shown in Table 1-1 at the end of this section. An ERC represents the annual average use of an individually metered residential (single-family)customer. For the determination of the estimated number of ERCs served, such estimates were based on the use of meter equivalent factors applied to the meters in service. The meter equivalent factors were based on information published by the American Water Works Association (AWWA), which documents the capacities of the various meter sizes typically used by Florida utilities in the establishment of monthly base facility charges, including the Florida Public Service Commission (FPSC) and the City. The meter equivalent factors are based on the equivalent hydraulic throughput capacity of the meters and are shown in the following Exhibit 1-1 by meter size: Page 339 of 1707 1-2 .... I .r; '.: Water and Sewer Rate Study Exhibit 1-1: Meter Equivalent Factors Meter Size Meter Equivalent (inches) - (ERC F 5/8"and 3/4" 1 1" 2.5 1-1/2" 5 2" 8 3" 16 4" 25 6" 50 8" 80 10" 115 12" 215 Based on discussions with the City staff, since the Utility service area is essentially built out, no customer growth was assumed during the Forecast Period. Due to the COVID-19 pandemic and as noted in Table 1-1, the Utility has experienced a decrease in commercial usage. A three-year recovery period was assumed such that, by Fiscal Year 2023, customer usage would return to pre-COVID-19 levels. 4'. Sr r--,! During the Fiscal Year 2019, it is estimated that the City's utility service requirements included providing sewer service to an average of 9,606 retail sewer accounts and 36,969 retail sewer ERCs based on meter equivalency factors as shown in Table 1-1 at the end of this section. Similar to the water system, no sewer system customer growth was assumed during the Forecast Period.A three-year recovery period was assumed such that, by Fiscal Year 2023, customer usage would return to pre-COVID-19 levels. 1-5 RS"vf,,, ,_ ti.0 Under Existing• Monthly `isci '\ j, .. Ret,H The forecast of retail revenues from existing water and sewer rates was based on: i) the projection of System accounts and corresponding water and sewer consumption as shown in Table 1-1; and ii) the existing rates for monthly water and sewer service as currently adopted by the City.A summary of the estimated water and sewer user rate revenues derived under existing rates is included in Table 1-2 at the end of this section.The projected water and sewer user rate revenues by fiscal year based on the previously discussed forecast of customer statistics is summarized in the following Exhibit 1-2: Page 340 of 1707 1-3 •r:: Water and Sewer Rate Study Exhibit 1-2: Projected Retail Rate Revenues Under Existing_Monthly Water and Sewer User Rates [1] Fiscai`Year ?September 30,. .. • Wastewater. Coed teOcted) Water System .... Wim System 2020(est.) $ 31,337,902 $ 46,507,450 $ 77,845,352 2021 32,015,679 47,537,926 79,553,605 2022 33,380,467 49,367,941 82,748,409 2023 to 2030 34,745,255 51,197,957 85,943,213 [1]Amounts shown derived from Table 1-2. The preceding Exhibit 1-2 reflects the assumed three (3)year economic recovery period. R ti 1 .iea ti� ,'�!tl f �.1. 1 • .� i.": �tC: _1 L. cq �: �` � 1��ii s i., l'a til.:t'I'b� The costs associated with operating and maintaining a utility system, as well as the costs of financing the renewals and replacements of existing facilities and the capital improvements for upgrades and expansions, are generally considered as the revenue requirements of a public utility such as the City's System. The sum of these costs, after adjusting for other operating and non-operating(e.g., interest income,impact fees available to pay expansion-related debt service) revenues available to the utility, represents the net revenue requirements of a utility system that must be funded from the monthly user charges or rates. The following is a summary of the net revenue requirement derivation: + Cost of Operation and Maintenance + Debt Service Payments(Senior and Subordinate) + Transfers and Administration Payments + Capital Project Financing + Working Capital Reserves/ Financial Compliance - Other Operating Revenue and Other Funding Sources - Interest Income = Net Revenue Requirements (Funded from User Rates) Net revenue requirements signify the expenditure levels required to be recovered from monthly user fees or rates. The development of the net revenue requirements of the System is a critical component of the analysis since utility rates should be designed to fully recover the cost of providing service. Page 341 of 1707 1-4 It‘ c::?'h : :;; : : tG-ida Water and Sewer Rate Study The financial evaluation contained in this utility rate analysis covered projections for the 11 fiscal year period of October 1, 2019 through September 30, 2030 (previously defined as the "Forecast Period"). A forecast of System operations was prepared in order to: i) assess the adequacy of utility rates in the near future; ii) recognize potential cost recovery strategies based on the phase- in of any required rate adjustments to meet the projected revenue requirements and finance identified capital expenditure requirements; and iii) examine the financial implications of alternatives to funding the System's multi-year capital improvement program. The projected revenue requirements are shown in Tables 1-3 and 1-4 at the end of this section for the water system and sewer system, respectively, while the combined System revenue requirements are shown in Table 1-5. In the preparation of the financial projections contained in this report and the conclusions that follow,GovRates has made certain assumptions with respect to conditions that may occur in the future. While we believe the assumptions are reasonable and based on the best available information for the purpose of this report,they are dependent upon future events, and actual conditions may differ from those assumed. We recommend that the City continue to compare actual results with the projections contained in this report to ensure that the Utility's rates continue to be sufficient. For the purposes of the financial projections, the principal considerations and assumptions were either made by us or provided to us by others. These primary considerations and assumptions include the following: 1. Projected revenues from current rates and charges for the City's water system and sewer system have been based on the schedule of rates and charges currently in effect. Such rates were applied to the customer and sales usage forecast discussed previously. 2. The Fiscal Years 2020 and 2021 Operating and Capital Budgets as provided by the City served as the baseline for the expenditure projections for the remainder of the Forecast Period and the underlying assumptions contained in these budgets were considered reasonable and to reflect anticipated operations.The budgeted operating expenses were compared with actual historical results and trends in operating expenses. 3. Table 1-6 at the end of this section summarizes: i) the budgeted Fiscal Year 2020 and Fiscal Year 2021 operations and maintenance expenses for the System; ii) the adjustments made to the forecast for known operational and ratemaking considerations; and iii) the allocation of such expenses between the water and sewer systems. 4. The operation and maintenance expenses for the water and sewer systems identified for the Fiscal Year 2021 were projected for the remaining nine (9) years of the Forecast Period (through Fiscal Year 2030).These projections are displayed on Tables 1-7 and 1-8 at the end Page 342,of,1707 1-5 Water and Sewer Rate Study of this section for the water and sewer systems, respectively, while Table 1-9 shows the projected operation and maintenance expenses on a combined basis. Table 1-10 indicates the escalation factors utilized in the analysis that were based on the nature of the expense and information provided by the City staff. The forecast of inflation was based upon the consumer price index (CPI) forecast prepared by the Congressional Budget Office as contained in "The Budget and Economic Outlook: 2020 to 2030" published in January 2020. Despite the COVID-19 pandemic, the Congressional Budget Office is still projecting inflation to continue in the future.This inflation forecast was compared to other pricing indices used by many utilities for financial forecasting and rate review purposes. Major cost escalation factors assumed were based on discussions with City staff and include: • Salaries and Wages: 3.0% per year • Health Insurance: 5.0% per year • Repair and Maintenance Expenses: 4.0% per year • Property/General Insurance: 4.0% per year • Electricity Commodity Cost: 4.0% per year • Chemicals Commodity Cost: 4.0% per year • Gas/ Fuel Commodity Cost: 5.0% per year • Administrative Charge to General Fund: 3.0% per year 5. The wholesale water and sewer charges from Miami-Dade County were held constant after Fiscal Year 2021 under the assumption that the City would pass-through all future wholesale increases via the pass-through formula currently in the City's Code of Ordinances. Table 1- 11 at the end of this section contains the projected wholesale water and sewer charges. 6. Based on discussions with City staff, no additional personnel above Fiscal Year 2021 budget levels have been recognized for purposes of developing the financial forecast. 7. In the projection of the estimated expenditure requirements, a contingency allowance has been included for Fiscal Years 2020 through 2030.This annual allowance of about$3 million has been included as an operating expense in order to have additional funds to meet unknown or unplanned expenses throughout the fiscal year and to recognize potential changes in revenues that may result due to weather, conservation, and other factors. To the extent the contingency allowance is not required to meet annual operating expenses or provide funds for ongoing System operations, such monies would accrue to the benefit of the System and could be used for other purposes such as funding renewals, replacements, and upgrades to the System over time.The Utility has historically had to utilize contingency allowances for unplanned for expenditures during each fiscal year. 8. An allowance for bad debt expenses has been made to recognize that a certain amount of revenues will be considered as uncollectible and written off throughout the year. This Page 343 of 1707 1-6 Water and Sewer Rate Study expenditure item reflects an incremental adjustment to each year's operating expenses and was estimated at 0.50% of user rate revenue. 9. For the purposes of this analysis, amounts associated with depreciation and amortization expenses have not been recognized in this analysis. These expenditures are non-cash in nature and are also not considered as operating expenses for ratemaking purposes under the flow of funds provision of the Utility's bond resolution. Therefore, such amounts have not been recognized as a revenue requirement to be recovered from rates for the Forecast Period. It should be noted that an allowance for the funding of capital projects, renewals/ replacements, and/or reserves has been recognized which essentially provides for the cash funding of these expenses. 10. The System's outstanding and anticipated debt consists of senior lien revenue bond issues. The City currently has the opportunity to refund the Utility's outstanding Series 2010 Bonds to save approximately $16.5 million in debt service payments during the Forecast Period. These projected savings are based on debt runs provided by the City's Financial Advisor and summarized in the following Exhibit 1-3. The financial forecast reflected in this report assumes that the City will proceed with the refunding. Exhibit 1-3: Potential Annual Debt Service Savings If Series 2010 Bonds Are Refunded Series 2009 Projected Current Refunding Issue Fiscal Year Payments Payments Difference 2021 [*] 4,209,465 530,400 (3,679,065) 2022 5,084,563 795,600 (4,288,963) 2023 5,082,063 2,864,700 (2,217,363) 2024 5,084,406 2,857,550 (2,226,856) 2025 1,500,000 760,800 (739,200) 2026 1,500,000 759,800 (740,200) 2027 1,500,000 838,000 (662,000) 2028 1,500,000 840,350 (659,650) 2029 1,500,000 842,600 (657,400) 2030 1,500,000 844,750 (655,250) Debt Service Difference During Forecast Period ($16,525,947) [*] For Fiscal Year 2021,reflects $4,918,394 total debt service payment less $708,929.17 interest payment for Series 2010 Bonds that would be paid prior to closing on refunding issue. To fund a portion of the multi-year capital improvement program, it was assumed that approximately$50.2 million in capital needs would be financed through a 2022 bond issue. Page 344 of 1707 1-7 Water and Sewer Rate Study Assumptions for this additional bond issue that were provided by the City's Financial Advisor include: i) a principal amount of $50,655,000; ii) a term of 30 years; iii) an average coupon rate of 5.0%; iv) issuance costs of$452,620; and v) a delivery date of February 3, 2022. Debt service payments for this issue were assumed to be wrapped around existing debt service payments to achieve overall level debt service. The assumed debt service payments are $1.463 million in Fiscal Year 2022; $2.533 million per year from Fiscal Years 2023 to 2047; and $11.7 million per year for Fiscal Years 2048 to 2052. Table 1-12 at the end of this section contains a summary of projected debt service payments during the Forecast Period. 11. The projected capital expenditures over the next 11 years(i.e.,through the Fiscal Year ending September 30, 2030) for the water and sewer system were based on discussions with the City staff. Table 1-13 at the end of this section provides a detailed listing of the capital projects for the water and sewer system as well as projected funding sources for such projects within the analysis period. 12. Interest income has been recognized as an available revenue source to fund the expenditure needs of the System. For the Forecast Period, interest income was based on estimated balances in unrestricted funds as defined in the Bond Resolution.Thus,for the determination of the revenue requirements from rates, no earnings have been reflected on balances in the impact fee funds or in the Construction Fund established from proceeds derived from the issuance of senior lien obligations to fund capital projects. Although the restricted earnings are available for capital project funding, the earnings are not being considered as being available to fund utility operating expenses since such earnings are restricted to the account pursuant to the Bond Resolution. As such, the earnings on the restricted funds are not included in the development of the revenue requirements of the Utility system. In the development of the estimated interest earnings, an average interest rate of 1.00% was assumed to be earned on the estimated average fund balances during the Forecast Period. This interest rate is based on recent earning performance results of the utility, discussions with the City, and a review of earnings performance of available investment vehicles to the City (e.g., State Board of Administration). Table 1-14 at the end of this section contains the projection of fund balances and interest income. 13. The City receives other operating revenues from miscellaneous charges for specific customer service requests or needs which serve to reduce rate revenue requirements. Examples of such revenues include turn-on and turn-off charges, initiation of service charges, meter Page 345 of 1707 1-8 Water and Sewer Rate Study installation and tap-in charges, late payment fees,and fire protection charges.Such amounts were generally held constant during the Forecast Period. Table 1-15 at the end of this section contains the projection of these other revenues. r As shown on Tables 1-3 and 1-4 at the end of this section and as shown in the financial overview and graphical presentation in the executive summary of this report,3.50%annual water revenue increases and 1.5%annual sewer revenue increases have been recognized through the Fiscal Year 2025. From Fiscal Year 2022 through 2025, it is assumed that the City will pass-through future wholesale rate increases from the County. Beyond Fiscal Year 2025, it is assumed that the City will implement both pass-through and CPI indexing adjustments as allowed per the City's Code of Ordinances. These adjustments are based on the assumptions discussed throughout this report. K i 1 ( 1 til i_ A significant financial parameter of the System is the ability to be in compliance with the rate covenants as defined in the Bond Resolution. Among other things, the Bond Resolution contains certain covenants with must be satisfied, the purpose of which is to provide a surety to the bondholders that the debt payments will be made during the term of such bonds. Generally, these covenants are in the form of: i) certain debt service coverage ratios which are applicable to the level of rates charged and the revenue margins achieved; ii) application of funds; and iii) certain requirements associated with the provision of service. The Utility's Bond Resolution contains a covenant under which the City will establish rates such that: "Net Revenues...will be sufficient to provide an amount in each Fiscal Year at least equal to one hundred ten per centum (110%)of the Principal and Interest Requirements for such Fiscal Year on account of the Bonds then Outstanding..." Net Revenues do not include administration fees. Table 1-16 at the end of this section summarizes the ability of the System Net Revenues to meet the rate covenant provisions of the Bond Resolution.Assuming the adoption of the proposed rate adjustments,the Net Revenues of the water and sewer system are expected to meet the rate covenant requirements as defined in the Bond Resolution. The projected coverage is summarized in the following Exhibit 1-4: Page 346 of 1707 1-9 Water and Sewer Rate Study Exhibit 1-4: Projected Net Revenues Debt Service Coverage Senior Lien Net Revenues Debt Senior Lien` t Revenues Debt " Service Coverage Service Coverage Fiscal Without Administration Fees With Administration Fees Yea ;ild=110 2021 298% 266% 2022 283% 255% 2023 235% 214% 2024 248% 226% 2025 232% 212% 2026 233% 212% 2027 263% 239% 2028 264% 239% 2029 263% 238% 2030 264% 238% [*] Derived from Table 1-16. To provide additional information to the City, a summary of the projected sources and uses of funds for each of the Utility's major fund types is shown in Table 1-17 at the end of this section. The projected sources equal the projected uses. Page 347 of 1707 1-10 Table 1-1 City of Miami Beach,Florida Water and Sewer Rate Study Summary of Historical and Projected Water and Sewer Customer Statistics : t. �20}...r' � r 911. 202.17-.„T .••',.-2018, 4. ` 1813Ja. -rolletom 1021 .:. . 1029 2030 WATER Residential-Domestic 1 Average Monthly Customers 5,692 5,692 5,692 5,692 5,692 5,692 5,692 5,692 5,692 5,692 5,692 5,692 2 Change in Average Monthly Accounts 0 0 0 0 0 0 0 0 0 0 0 3 Average Monthly ERCs 15,421 15,421 15,421 15,421 15,421 15,421 15,421 15,421 15,421 15,421 15,421 15,421 4 Average Monthly ERCs Per Customer 2.71 2.71 2.71 2.71 2.71 2.71 2.71 2.71 2.71 2.71 2.71 2.71 5 Annual Water Sales(kgal) 741,747 752,456 740,525 741,136 741,747 741,747 741,747 741,747 741,747 741,747 741,747 741,747 6 Average Monthly Water Sales Per Customer(kgal) 10.86 11.02 10.84 10.85 10.86 10.86 10.86 10.86 10.86 10.86 10.86 10.86 7 Average Monthly Water Sales Per ERC(kgal) 4.01 4.07 4.00 4.00 4.01 4.01 4.01 4.01 4.01 4.01 4.01 4.01 Residential-Irrigation 8 Average Monthly Customers 1,919 1,919 1,919 1,919 1,919 1,919 1,919 1,919 1,919 1,919 1,919 1,919 9 Change in Average Monthly Accounts 0 0 0 0 0 0 0 0 0 0 0 10 Average Monthly ERCs 6,356 6,356 6,356 6,356 6,356 6,356 6,356 6,356 6,356 6,356 6,356 6,356 11 Average Monthly ERCs Per Customer 3.31 3.31 3.31 3.31 3.31 3.31 3.31 3.31 3.31 3.31 3.31 3.31 12 Annual Water Sales(kgal) 530,939 488,681 501,391 516,165 530,939 530,939 530,939 530,939 530,939 530,939 530,939 530,939 13 Average Monthly Water Sales Per Customer(kgal) 23.06 21.22 21.77 22.42 23.06 23.06 23.06 23.06 23.06 23.06 23.06 23.06 14 Average Monthly Water Sales Per ERC(kgal) 6.96 6.41 6.57 6.77 6.96 6.96 6.96 6.96 6.96 6.96 6.96 6.96 Apartment-Domestic 15 Average Monthly Customers 1,234 1,234 1,234 1,234 1,234 1,234 1,234 1,234 1,234 1,234 1,234 1,234 16 Change in Average Monthly Accounts 0 0 0 0 0 0 0 0 0 0 0 17 Average Monthly ERCs 4,157 4,157 4,157 4,157 4,157 4,157 4,157 4,157 4,157 4,157 4,157 4,157 18 Average Monthly ERCs Per Customer 3.37 3.37 3.37 3.37 3.37 3.37 3.37 3.37 3.37 3.37 3.37 3.37 19 Annual Water Sales(kgal) 604,839 568,223 579,236 592,038 604,839 604,839 604,839 604,839 604,839 604,839 604,839 604,839 20 Average Monthly Water Sales Per Customer(kgal) 40.84 38.36 39.11 39.97 40.84 40.84 40.84 40.84 40.84 40.84 40.84 40.84 21 Average Monthly Water Sales Per ERC(kgal) 12.13 11.39 11.61 11.87 12.13 12.13 12.13 12.13 12.13 12.13 12.13 12.13 Apartment-Irrigation 22 Average Monthly Customers 56 56 56 56 56 56 56 56 56 56 56 56 23 Change in Average Monthly Accounts 0 0 0 0 0 0 0 0 0 0 0 24 Average Monthly ERCs 216 216 216 216 216 216 216 216 216 216 216 216 25 Average Monthly ERCs Per Customer 3.88 3.88 3.88 3.88 3.88 3.88 3.88 3.88 3.88 3.88 3.88 3.88 26 Annual Water Sales(kgal) 36,291 28,637 31,188 33,739 36,291 36,291 36,291 36,291 36,291 36,291 36,291 36,291 27 Average Monthly Water Sales Per Customer(kgal) 54.25 42.80 46.62 50.43 54.25 54.25 54.25 54.25 54.25 54.25 54.25 54.25 28 Average Monthly Water Sales Per ERC(kgal) 13.99 11.04 12.03 13.01 13.99 13.99 13.99 13.99 13.99 13.99 13.99 13.99 Condominium-Domestic 29 Average Monthly Customers 1,235 1,235 1,235 1,235 1,235 1,235 1,235 1,235 1,235 1,235 1,235 1,235 30 Change in Average Monthly Accounts 0 0 0 0 0 0 0 0 0 0 0 31 Average Monthly ERCs 8,832 8,832 8,832 8,832 8,832 8,832 8,832 8,832 8,832 8,832 8,832 8,832 32 Average Monthly ERCs Per Customer 7.15 7.15 7.15 7.15 7.15 7.15 7.15 7.15 7.15 7.15 7.15 7.15 33 Annual Water Sales(kgal) 1,865,058 1,837,024 1,801,947 1,833,503 1,865,058 1,865,058 1,865,058 1,865,058 1,865,058 1,865,058 1,865,058 1,865,058 34 Average Monthly Water Sales Per Customer(kgal) 125.88 123.99 121.62 123.75 125.88 125.88 125.88 125.88 125.88 125.88 125.88 125.88 35 Average Monthly Water Sales Per ERC(kgal) 17.60 17.33 17.00 17.30 17.60 17.60 17.60 17.60 17.60 17.60 17.60 17.60 Page 348 of 1707 1-11 Table 1-1 City of Miami Beach,Florida Water and Sewer Rate Study .,rte I 4 t;i . Summary of Historical and Projected Water and Sewer Customer Statisticsr rt ::l fir, g ' t o- r ,��« t ;r4s'Yl xW;, ' ' 0 r ',?-1 r :7'."":."'..:0." x i5 ri-t 11� .'Nt4.4.gib@' 315'-'2."'" 11' . . :. ... r��IWIY Y1 t .:,... -. : i . .. i ..a:2021 . .2022 2'0 .n. „202d o 2025 202; _ ° 2029,, .1 7 r.- 2029 2030 Condominium-Irrigation 36 Average Monthly Customers 222 222 222 222 222 222 222 222 222 222 222 222 37 Change in Average Monthly Accounts 0 0 0 0 0 0 0 0 0 0 0 38 Average Monthly ERCs 1,353 1,353 1,353 1,353 1,353 1,353 1,353 1,353 1,353 1,353 1,353 1,353 39 Average Monthly ERCs Per Customer 6.08 6.08 6.08 6.08 6.08 6.08 6.08 6.08 6.08 6.08 6.08 6.08 40 Annual Water Sales(kgal) 278,013 264,409 255,087 266,550' 278,013 278,013 278,013 278,013 278,013 278,013 278,013 278,013 41 Average Monthly Water Sales Per Customer(legal) 104.16 99.07 95.57 99.87 104.16 104.16 104.16 104.16 104.16 104.16 104.16 104.16 42 Average Monthly Water Sales Per ERC(kgal) 17.13 16.29 15.72 16.42 17.13 17.13 17.13 17.13 17.13 17.13 17.13 17.13 Duplex-Domestic 43 Average Monthly Customers 25 25 25 25 25 25 25 25 25 25 25 25 44 Change in Average Monthly Accounts 0 0 0 0 0 0 0 0 0 0 0 45 Average Monthly ERCs 62 62 62 62 62 62 62 62 62 62 62 62 46 Average Monthly ERCs Per Customer 2.47 2.47 2.47 2.47 2.47 2.47 2.47 2.47 2.47 2.47 2.47 2.47 47 Annual Water Sales(kgal) 3,422 3,271 3,190 3,306 3,422 3,422 3,422 3,422 3,422 3,422 3,422 3,422 48 Average Monthly Water Sales Per Customer(kgal) 11.37 10.87 10.60 10.98 11.37 11.37 11.37 11.37 11.37 11.37 11.37 11.37 49 Average Monthly Water Sales Per ERC(kgal) 4.61 4.40 4.29 4.45 4.61 4.61 4.61 4.61 4.61 4.61 4.61 4.61 Duplex-Irrigation 50 Average Monthly Customers 1 1 1 1 1 I 1_ I 1 1 1 1 51 Change in Average Monthly Accounts 0 0 0 0 0 0 0 0 0 0 0 52 Average Monthly ERCs 5 5 5 5 5 5 5 5 5 5 5 5 53 Average Monthly ERCs Per Customer 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 54 Annual Water Sales(kgal) 133 229 133 133 133 133 133 133 133 133 133 133 55 Average Monthly Water Sales Per Customer(kgal) 11.06 19.06 11.06 11.06 11.06 11.06 11.06 11.06 11.06 11.06 11.06 11.06 56 Average Monthly Water Sales Per ERC(kgal) 2.21 3.81 2.21 2.21 2.21 2.21 2.21 2.21 2.21 2.21 2.21 2.21 Commercial-Domestic 57 Average Monthly Customers 1,842 1,842 1,842 1,842 1,842 1,842 1,842 1,842 1,842 1,842 1,842 1,842 58 Change in Average Monthly Accounts 0 0 0 0 0 0 0 0 0 0 0 59 Average Monthly ERCs 7,920 7,920 7,920 7,920 7,920 7,920 7,920 7,920 7,920 7,920 7,920 7,920 60 Average Monthly ERCs Per Customer 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 61 Annual Water Sales(kgal) 1,041,032 851,067 914,356 977,694 1,041,032 1,041,032 1,041,032 1,041,032 1,041,032 1,041,032 1,041,032 1,041,032 62 Average Monthly Water Sales Per Customer(kgal) 47.09 38.49 41.36 44.22 47.09 47.09 47.09 47.09 47.09 47.09 47.09 47.09 63 Average Monthly Water Sales Per ERC(kgal) 10.95 8.96 9.62 10.29 10.95 10.95 10.95 10.95 10.95 10.95 10.95 10.95 Commercial-Irrigation 64 Average Monthly Customers 279 279 279 279 279 279 279 279 279 279 279 279 65 Change in Average Monthly Accounts 0 0 0 0 0 0 0 0 0 0 0 66 Average Monthly ERCs 1,916 1,916 1,916 1,916 1,916 1,916 1,916 1,916 1,916 1,916 1,916 1,916 67 Average Monthly ERCs Per Customer 6.88 6.88 6.88 6.88 6.88 6.88 6.88 6.88 6.88 6.88 6.88 6.88 68 Annual Water Sales(kgal) 372,355 338,613 342,070 357,213 372,355 372,355 372,355 372,355 372,355 372,355 372,355 372,355 69 Average Monthly Water Sales Per Customer(kgal) 111.35 101.26 102.29 106.82 111.35 111.35 111.35 111.35 111.35 111.35 111.35 111.35 70 Average Monthly Water Sales Per ERC(kgal) 16.19 14.73 14.88 15.53 16.19 16.19 16.19 16.19 16.19 16.19 16.19 16.19 Page 349 of 1707 i„ , 1-12 Table 1-1 City of Miami Beach,Florida Water and Sewer Rate Study Summary of Historical and Projected Water and Sewer Customer Statistics fin•, : Zll '} 2 .e�...'7 ., . ,,,,..,•:. X026 T! ..,... .. .,.3:. 2029 • 2030 • Hotel-Domestic 71 Average Monthly Customers 268 268 268 268 268 268 268 268 268 268 268 268 72 Change in Average Monthly Accounts 0 0 0 0 0 0 0 0 0 0 0 73 Average Monthly ERCs 2,329 2,329 2,329 2,329 2,329 2,329 2,329 2,329 2,329 2,329 2,329 2,329 74 Average Monthly ERCs Per Customer 8.70 8.70 8.70 8.70 8.70 8.70 8.70 8.70 8.70 8.70 8.70 8.70 75 Annual Water Sales(kgal) 715,657 513,419 580,832 648,244 715,657 715,657 715,657 715,657 715,657 715,657 715,657 715,657 76 Average Monthly Water Sales Per Customer(kgal) 222.81 159.84 180.83 201.82 222.81 222.81 222.81 222.81 222.81 222.81 222.81 222.81 77 Average Monthly Water Sales Per ERC(kgal) 25.61 18.37 20.78 23.19 25.61 25.61 25.61 25.61 25.61 25.61 25.61 25.61 Hotel-Irrigation 78 Average Monthly Customers 69 69 69 69 69 69 69 69 69 69 69 69 79 Change in Average Monthly Accounts 0 0 0 0 0 0 0 0 0 0 0 80 Average Monthly ERCs 471 471 471 471 471 471 471 471 471 471 471 471 81 Average Monthly ERCs Per Customer 6.84 6.84 6.84 6.84 6.84 6.84 6.84 6.84 6.84 6.84 6.84 6.84 82 Annual Water Sales(kgal) 253,324 120,852 163,908 208,616 253,324 253,324 253,324 253,324 253,324 253,324 253,324 253,324 83 Average Monthly Water Sales Per Customer(kgal) 306.32 146.13 198.20 252.26 306.32 306.32 306.32 306.32 306.32 306.32 306.32 306.32 84 Average Monthly Water Sales Per ERC(kgal) 44.78 21.36 28.97 36.88 44.78 44.78 44.78 44.78 44.78 44.78 44.78 44.78 City-Domestic 85 Average Monthly Customers 111 111 III 11l III III 111 III 1ll 111 I11 111 86 Change in Average Monthly Accounts 0 0 0 0 0 0 0 0 0 0 0 87 Average Monthly ERCs 846 846 846 846 846 846 846 846 846 846 846 846 88 Average Monthly ERCs Per Customer 7.65 7.65 7.65 7.65 7.65 7.65 7.65 7.65 7.65 7.65 7.65 7.65 89 Annual Water Sales(kgal) 87,701 88,402 80,353 84,027 87,701 87,701 87,701 87,701 87,701 87,701 87,701 87,701 90 Average Monthly Water Sales Per Customer(kgal) 66.09 66.62 60.55 63.32 66.09 66.09 66.09 66.09 66.09 66.09 66.09 66.09 91 Average Monthly Water Sales Per ERC(kgal) 8.64 8.71 7.92 8.28 8.64 8.64 8.64 8.64 8.64 8.64 8.64 8.64 City-Irrigation 92 Average Monthly Customers 526 526 526 526 526 526 526 526 526 526 526 526 93 Change in Average Monthly Accounts 0 -0 0 0 0 0 0 0 0 0 0 94 Average Monthly ERCs 3,388 3,388 3,388 3,388 3,388 3,388 3,388 3,388 3,388 3,388 3,388 3,388 95 Average Monthly ERCs Per Customer 6.44 6.44 6.44 6.44 6.44 6.44 6.44 6.44 6.44 6.44 6.44 6.44 96 Annual Water Sales(kgal) 330,390 308,011 301,300 315,845 330,390 330,390 330,390 330,390 330,390 330,390 330,390 330,390 97 Average Monthly Water Sales Per Customer(kgal) 52.34 48.80 47.73 50.04 52.34 52.34 52.34 52.34 52.34 52.34 52.34 52.34 98 Average Monthly Water Sales Per ERC(kgal) 8.13 7.58 7.41 7.77 8.13 8.13 8.13 8.13 8.13 8.13 8.13 8.13 Total Water 99 Average Monthly Customers 13,478 13,478 13,478 13,478 13,478 13,478 13,478 13,478 13,478 13,478 13,478 13,478 100 Change in Average Monthly Accounts 0 0 0 0 0 0 0 0 0 0 0 101 Average Monthly ERCs 53,272 53,272 53,272 53,272 53,272 53,272 53,272 53,272 53,272 53,272 53,272 53,272 102 Change in Average Monthly ERCs 0 0 0 0 0 0 0 0 0 0 0 103 Average Monthly ERCs Per Customer 3.95 3.95 3.95 3.95 3.95 3.95 3.95 3.95 3.95 3.95 3.95 3.95 104 Annual Water Sales(kgal) 6,860,900 6,163,293 6,295,515 6,578,207 6,860,900 6,860,900 6,860,900 6,860,900 6,860,900 6,860,900 6,860,900 6,860,900 105 Average Monthly Water Sales Per Customer(kgal) 42.42 38.11 38.92 40.67 42.42 42.42 42.42 42.42 42.42 42.42 42.42 42.42 106 Average Monthly Water Sales Per ERC(kgal) 10.73 9.64 9.85 10.29 10.73 10.73 10.73 10.73 10.73 10.73 10.73 10.73 107 Total Water Purchased(MGD) 8,109,301 7,284,759 7,441,040 7,775,170 8,109,301 8,109,301 8,109,301 8,109,301 8,109,301 8,109,301 8,109,301 8,109,301 108 Non-Revenue Water Percentage 15.4% 15.4% 15.4% 15.4% 15.4% 15.4% 15.4% 15.4% 15.4% 15.4% 15.4% 15.4% Page 350 of 1707 . 1-13 Table 1-1 City of Miami Beach,Florida Water and Sewer Rate Study Summary of Historical and Projected Water and Sewer Customer Statistics s^' - .n fii�' 3 `i r- ,.,^ ,nf '.,':,{ tR:L�Sr �.. {r� M��r:'� k� � + ; ,r •;� 1 MYer 31) -. :: Afi Y.,, .•:''''..;'' '''.:'.-:‘,..I. .. • .. ,. 1 ':sr:'.f tr,,.7e:";r,,, i.vt.',,;: I 1.��. . .,_,.... a.. ,. '`.,,i . .,1.:;. :',A.,. 1.:2111,;. � . w . t@2, .� , V F2029 3030 SEWER-RETAIL Residential-Domestic 109 Average Monthly Customers 5,084 5,084 5,084 5,084 5,084 5,084 5,084 5,084 5,084 5,084 5,084 5,084 110 Change in Average Monthly Accounts 0 0 0 0 0 0 0 0 0 0 0 111 Average Monthly ERCs 13,667 13,667 13,667 13,667 13,667 13,667 13,667 13,667 13,667 13,667 13,667 13,667 112 Average Monthly ERCs Per Customer 2.69 2.69 2.69 2.69 2.69 2.69 2.69 2.69 2.69 2.69 2.69 2.69 113 Annual Sewer Revenue Flow(kgal) 624,788 634,034 623,772 624,280 624,788 624,788 624,788 624,788 624,788 624,788 624,788 624,788 114 Average Monthly Sewer Revenue Flow Per Customer(kgal) 10.24 10.39 10.22 10.23 10.24 10.24 10.24 10.24 10.24 10.24 10.24 10.24 115 Average Monthly Sewer Revenue Flow Per ERC(kgal) 3.81 3.87 3.80 3.81 3.81 3.81 3.81 3.81 3.81 3.81 3.81 3.81 Apartment-Domestic 116 Average Monthly Customers 1,162 1,162 1,162 1,162 1,162 1,162 1,162 1,162 1,162 1,162 1,162 1,162 117 Change in Average Monthly Accounts 0 0 0 0 0 0 0 0 0 0 0 118 Average Monthly ERCs 3,939 3,939 3,939 3,939 3,939 3,939 3,939 3,939 3,939 3,939 3,939 3,939 119 Average Monthly ERCs Per Customer 3.39 3.39 3.39 3.39 3.39 3.39 3.39 3.39 3.39 3.39 3.39 3.39 120 Annual Sewer Revenue Flow(kgal) 572,341 537,094 547,723 560,032 572,341 572,341 572,341 572,341 572,341 572,341 572,341 572,341 121 Average Monthly Sewer Revenue Flow Per Customer(kgal) 41.06 38.53 39.29 40.17 41.06 41.06 41.06 41.06 41.06 41.06 41.06 41.06 122 Average Monthly Sewer Revenue Flow Per ERC(kgal) 12.11 11.36 11.59 11.85 12.11 12.11 12.11 12.11 12.11 12.11 12.11 12.11 Condominium-Domestic 123 Average Monthly Customers 1,195 1,195 1,195 1,195 1,195 1,195 1,195 1,195 1,195 1,195 1,195 1,195 124 Change in Average Monthly Accounts 0 0 0 0 0 0 0 0 0 0 0 125 Average Monthly ERCs 8,550 8,550 8,550 8,550 8,550 8,550 8,550 8,550 8,550 8,550 8,550 8,550 126 Average Monthly ERCs Per Customer 7.16 7.16 7.16 7.16 -. 7.16 7.16 7.16 7.16 7.16 7.16 7.16 7.16 127 Annual Sewer Revenue Flow(kgal) 1,798,803 1,773,856 1,738,772 1,768,787 1,798,803 1,798,803 1,798,803 1,798,803 1,798,803 1,798,803 1,798,803 1,798,803 128 Average Monthly Sewer Revenue Flow Per Customer(kgal) 125.47 123.73 121.29 123.38 125.47 125.47 125.47 125.47 125.47 125.47 125.47 125.47 129 Average Monthly Sewer Revenue Flow Per ERC(kgal) 17.53 17.29 16.95 17.24 17.53 17.53 17.53 17.53 17.53 17.53 17.53 17.53 Duplex-Domestic 130 Average Monthly Customers 22 22 22 22 22 22 22 22 22 22 22 22 131 Change in Average Monthly Accounts 0 0 0 0 0 0 0 0 0 0 0 132 Average Monthly ERCs 56 56 56 56 56 56 56 56 56 56 56 56 133 Average Monthly ERCs Per Customer 2.54 2.54 2.54 2.54 2.54 2.54 2.54 2.54 2.54 2.54 2.54 2.54 134 Annual Sewer Revenue Flow(kgal) 3,117 2,955 2,894 3,006 3,117 3,117 3,117 3,117 3,117 3,117 3,117 3,117 135 Average Monthly Sewer Revenue Flow Per Customer(kgal) 11.85 11.24 11.00 11.43 11.85 11.85 11.85 11.85 11.85 11.85 11.85 11.85 136 Average Monthly Sewer Revenue Flow Per ERC(kgal) 4.67 4.43 4.34 4.51 4.67 4.67 4.67 4.67 4.67 4.67 4.67 4.67 Commercial-Domestic 137 Average Monthly Customers 1,767 1,767 1,767 1,767 1,767 1,767 1,767 1,767 1,767 1,767 1,767 1,767 138 Change in Average Monthly Accounts 0 0 0 0 0 0 0 0 0 0 0 139 Average Monthly ERCs 7,595 7,595 7,595 7,595 7,595 7,595 7,595 7,595 7,595 7,595 7,595 7,595 140 Average Monthly ERCs Per Customer 4.30 4.30 4.30 4.30 430 4.30 4.30 4.30 4.30 4.30 4.30 4.30 141 Annual Sewer Revenue Flow(kgal) 979,713 801,969 861,184 920,449 979,713 979,713 979,713 979,713 979,713 979,713 979,713 979,713 142 Average Monthly Sewer Revenue Flow Per Customer(kgal) 46.22 37.83 40.62 43.42 46.22 46.22 46.22 46.22 46.22 4622 46.22 46.22 143 Average Monthly Sewer Revenue Flow Per ERC(kgal) 10.75 8.80 9.45 10.10 10.75 10.75 10.75 10.75 10.75 10.75 10.75 10.75 Page 351 of 1707 1-14 Table 1-1 City of Miami Beach,Florida Water and Sewer Rate Study Summary of Historical and Projected Water and Sewer Customer Statistics .,... i i . L ?t i 1. i +,.r FxPF A' 4F 1'f. ti, :''''r'' f 1.1IIIJ 1 � 1'�. i L 1 1+ '''...111111';4..;';r1:.:'',. .+. j � � � 1P .1..i rA' + i t �,e. M � 3 a 1 . • i ►` .. ,.. .1 , v 01.9 -$lr' • i }.,:,$ !'1 « ' � , .. ';`,30Z$. + 2026;. .. .Iffy: 1 . 21Z9 2030 Hotel-Domestic 144 Average Monthly Customers 266 266 266 266 266 266 266 266 266 266 266 266 145 Change in Average Monthly Accounts 0 0 0 0 0 0 0 0 0 0 0 146 Average Monthly ERCs 2,316 2,316 2,316 2,316 2,316 2,316 2,316 2,316 2,316 2,316 2,316 2,316 147 Average Monthly ERCs Per Customer 8.71 8.71 8.71 8.71 8.71 8.71 8.71 8.71 8.71 8.71 8.71 8.71 148 Annual Sewer Revenue Flow(kgal) 710,923 510,030 576,995 643,959 710,923 710,923 710,923 710,923 710,923 710,923 710,923 710,923 149 Average Monthly Sewer Revenue Flow Per Customer(kgal) 222.72 159.78 180.76 201.74 222.72 222.72 222.72 222.72 222.72 222.72 222.72 222.72 150 Average Monthly Sewer Revenue Flow Per ERC(kgal) 25.58 18.35 20.76 23.17 25.58 25.58 25.58 25.58 25.58 25.58 25.58 25.58 City-Domestic 151 Average Monthly Customers I11 111 I 1 I 111 III 1 I I 111 111 I1 I 111 111 III 152 Change in Average Monthly Accounts 0 0 0 0 0 0 0 0 0 0 0 153 Average Monthly ERCs 846 846 846 846 846 846 846 846 846 846 846 846 154 Average Monthly ERCs Per Customer 7.65 7.65 7.65 7.65 7.65 7.65 7.65 7.65 7.65 7.65 7.65 7.65 155 Annual Sewer Revenue Flow(kgal) 87,697 54,804 65,041 76,369 87,697 87,697 87,697 87,697 87,697 87,697 87,697 87,697 156 Average Monthly Sewer Revenue Flow Per Customer(kgal) 66.09 41.30 49.01 57.55 66.09 66.09 66.09 66.09 66.09 66.09 66.09 66.09 157 Average Monthly Sewer Revenue Flow Per ERC(kgal) 8.64 5.40 6.41 7.52 8.64 8.64 8.64 8.64 8.64 8.64 8.64 8.64 Total Retail Sewer 158 Average Monthly Customers 9,606 9,606 9,606 9,606 9,606 9,606 9,606 9,606 9,606 9,606 9,606 9,606 159 Change in Average Monthly Accounts 0 0 0 0 0 0 0 0 0 0 0 160 Average Monthly ERCs 36,969 36,969 36,969 36,969 36,969 36,969 36,969 36,969 36,969 36,969 36,969 36,969 161 Change in Average Monthly ERCs 0 0 0 0 0 0 0 0 0 0 0 162 Average Monthly ERCs Per Customer 3.85 3.85 3.85 3.85 3.85 3.85 3.85 3.85 3.85 3.85 3.85 3.85 163 Annual Sewer Revenue Flow(kgal) 4,777,381 4,314,742 4,416,381 4,596,881 4,777,381 4,777,381 4,777,381 4,777,381 4,777,381 4,777,381 4,777,381 4,777,381 164 Average Monthly Sewer Revenue Flow Per Customer(kgal) 41.45 37.43 38.31 39.88 41.45 41.45 41.45 41.45 41.45 41.45 41.45 41.45 165 Average Monthly Sewer Revenue Flow Per ERC(kgal) 10.77 9.73 9.96 10.36 10.77 10.77 10.77 10.77 10.77 10.77 10.77 10.77 SEWER-WHOLESALE Village of Bal Harbour 166 Average Monthly Customers 1 I I I I I I 1 1 I I 1 167 Change in Average Monthly Accounts 0 0 0 0 0 0 0 0 0 0 0 168 Annual Sewer Revenue Flow(kgal) 301,828 301,828 301,828 301,828 301,828 301,828 301,828 301,828 301,828 301,828 301,828 301,828 169 Average Monthly Sewer Revenue Flow Per Customer(kgal) 25,152.3 25,152.3 25,152.3 25,152.3 25,152.3 25,152.3 25,152.3 25,152.3 25,152.3 25,152.3 25,152.3 25,152.3 Town of Bay Harbor Islands 170 Average Monthly Customers I 1 I I I I I I I I I 1 171 Change in Average Monthly Accounts 0 0 0 0 0 0 0 0 0 0 0 172 Annual Sewer Revenue Flow(kgal) 272,204 272,204 272,204 272,204 272,204 272,204 272,204 272,204 272,204 272,204 272,204 272,204 173 Average Monthly Sewer Revenue Flow Per Customer(kgal) 22,683.7 22,683.7 22,683.7 22,683.7 22,683.7 22,683.7 22,683.7 22,683.7 22,683.7 22,683.7 22,683.7 22,683.7 Town of Surfside 174 Average Monthly Customers 1 I I I I I I I I I 1 1 175 Change in Average Monthly Accounts 0 0 0 0 0 0 0 0 0 0 0 176 Annual Sewer Revenue Flow(kgal) 331,736 331,736 331,736 331,736 331,736 331,736 331,736 331,736 331,736 331,736 331,736 331,736 177 Average Monthly Sewer Revenue Flow Per Customer(kgal) 27,644.7 27,644.7 27,644.7 27,644.7 27,644.7 27,644.7 27,644.7 27,644.7 27,644.7 27,644.7 27,644.7 27,644.7 Page 352 of 1707 I-15 Table 1-1 City of Miami Beach,Florida Water and Sewer Rate Study Summary of Historical and Projected Water and Sewer Customer Statistics 1,- ., :,'.-(.::,-,7,, ° E' 31 2029 2030 � ' .... �- . _ ... ... � .�,, . a .fa �„ •r .. . . ' �. era �. - a Total Wholesale Sewer 178 Average Monthly Customers 3 3 3 3 3 3 3 3 3 3 3 3 179 Change in Average Monthly Accounts 0 0 0 0 0 0 0 0 0 0 0 180 Annual Sewer Revenue Flow(kgal) 905,768 905,768 905,768 905,768 905,768 905,768 905,768 905,768 905,768 905,768 905,768 905,768 181 Average Monthly Sewer Revenue Flow Per Customer(kgal) 25,160.23 25,160.23 25,160.23 25,160.23 25,160.23 25,160.23 25,160.23 25,160.23 25,160.23 25,160.23 25,160.23 25,160.23 TOTAL RETAIL AND WHOLESALE SEWER 182 Average Monthly Customers 9,609 9,609 9,609 9,609 9,609 9,609 9.609 9,609 9,609 9,609 9,609 9,609 183 Change in Average Monthly Accounts 0 0 0 0 0 0 0 0 0 0 0 184 Annual Sewer Revenue Flow(kgal) 5,683,150 5,220,511 5,322,150 5,502,650 5,683,150 5,683,150 5,683,150 5,683,150 5,683,150 5,683,150 5,683,150 5,683,150 182 Total Sewer Purchased(kgal) 8,058,069 7,365,444 7,517,610 7,787,839 8,058,069 8,058,069 8,058,069 8,058,069 8,058,069 8,058,069 8,058,069 8,058,069 185 Total Wastewater Purchased(MOD) 22.08 20.18 20.60 21.34 22.08 22.08 22.08 22.08 22.08 22.08 22.08 22.084 Page 353 of 1707 1-16 Table 1-2 City of Miami Beach,Florida Water and Sewer Rate Study Projected Water and Sewer Retail User Rate Revenue Under Existing Rates -, ' nr-'. ! t'' ! t a a f '-f):'c •� 1� ,v , ,sv, ' 65 .F a -' . ,. st , :, • rr 2 �, i1.. "2-.. . .. I . 0• i',:,.."1„ 19'15 . .2036. ., °.1 ,. -211 5 . . 3039 1030:, r • tYi WATER USER RATE REVENUE Residential-Domestic 1 Base Facility Charges $ 599,869 $ 612,981 $ 612,981 $ 612,981 $ 612,981 $ 612,981 $ 612,981 $ 612,981 $ 612,981 $ 612,981 $ 612,981 $ 612,981 2 Consumption Charges 1,946,161 2,017,492 1,985,504 1,987,141 1,988,778 1,988,778 1,988,778 1,988,778 1,988,778 1,988,778 1,988,778 1,988,778 3 Purchased Water Pass-Through Charges 1,453,823 1,414,617 1,392,188 1,393,336 1,394,483 1,394,483 1,394,483 1,394,483 1,394,483 1,394,483 1,394,483 1,394,483 4 Total $ 3,999,852 $ 4,045,090 $ 3,990,673 $ 3,993,458 $ 3,996,243 $ 3,996,243 $ 3,996,243 $ 3,996,243 $ 3,996,243 $ 3,996,243 $ 3,996,243 $ 3,996,243 Residential-Irrigation 5 Base Facility Charges $ 206,169 $ 210,689 $ 210,689 $ 210,689 $ 210,689 $ 210,689 $ 210,689 $ 210,689 $ 210,689 $ 210,689 $ 210,689 $ 210,689 6 Consumption Charges 2,274,494 2,140,550 2,196,221 2,260,936 2,325,650 2,325,650 2,325,650 2,325,650 2,325,650 2,325,650 2,325,650 2,325,650 7 Purchased Water Pass-Through Charges 1,040,640 918,720 942,614 970,390 998,165 998,165 998,165 998,165 998,165 998,165 998,165 998,165 8 Total $ 3,521,303 $ 3,269,959 $ 3,349,524 $ 3,442,014 $ 3,534,504 $ 3,534,504 $ 3,534,504 $ 3,534,504 $ 3,534,504 $ 3,534,504 $ 3,534,504 $ 3,534,504 Apartment-Domestic 9 Base Facility Charges $ 349,804 $ 357,511 $ 357,511 $ 357,511 $ 357,511 $ 357,511 $ 357,511 $ 357,511 $ 357,511 $ 357,511 $ 357,511 $ 357,511 10 Consumption Charges 1,284,683 711,293 725,080 741,104 757,129 757,129 757,129 757,129 757,129 757,129 757,129 757,129 11 Purchased Water Pass-Through Charges 1,185,484 1,068,259 1,088,964 1,113,031 1,137,097 1,137,097 1,137,097 1,137,097 1,137,097 1,137,097 1,137,097 1,137,097 12 Total $ 2,819,972 $ 2,137,064 $ 2,171,555 $ 2,211,646 $ 2,251,737 $ 2,251,737 $ 2,251,737 $ 2,251,737 $ 2,251,737 $ 2,251,737 $ 2,251,737 $ 2,251,737 Apartment-Irrigation 13 Base Facility Charges $ 18,009 $ 18,406 $ 18,406 $ 18,406 $ 18,406 $ 18,406 $ 18,406 $ 18,406 $ 18,406 $ 18,406 $ 18,406 $ 18,406 14 Consumption Charges 139,896 112,880 122,937 132,994 143,051 143,051 143,051 143,051 143,051 143,051 143,051 143,051 15 Purchased Water Pass-Through Charges 71,129 53,837 58,633 63,430 68,226 68,226 68,226 68,226 68,226 68,226 68,226 68,226 16 Total $ 229,035 $ 185,123 $ 199,976 $ 214,830 $ 229,683 $ 229,683 $ 229,683 $ 229,683 $ 229,683 $ 229,683 $ 229,683 $ 229,683 Condominium-Domestic 17 Base Facility Charges $ 709,557 $ 725,165 $ 725,165 $ 725,165 $ 725,165 $ 725,165 $ 725,165 $ 725,165 $ 725,165 $ 725,165 $ 725,165 $ 725,165 18 Consumption Charges 4,484,072 4,518,014 4,431,746 4,509,354 4,586,962 4,586,962 4,586,962 4,586,962 4,586,962 4,586,962 4,586,962 4,586,962 19 Purchased Water Pass-Through Charges 3,655,514 3,453,605 3,387,661 3,446,985 3,506,309 3,506,309 3,506,309 3,506,309 3,506,309 3,506,309 3,506,309 3,506,309 20 Total $ 8,849,143 $ 8,696,784 $ 8,544,572 $ 8,681,504 $ 8,818,436 $ 8,818,436 $ 8,818,436 $ 8,818,436 $ 8,818,436 $ 8,818,436 $ 8,818,436 $ 8,818,436 Condominium-Irrigation 21 Base Facility Charges $ 109,739 $ 112,152 $ 112,152 $ 112,152 $ 112,152 $ 112,152 $ 112,152 $ 112,152 $ 112,152 $ 112,152 $ 112,152 $ 112,152 22 Consumption Charges 876,142 852,167 822,121 859,065 896,009 896,009 896,009 896,009 896,009 896,009 896,009 896,009 23 Purchased Water Pass-Through Charges 544,905 497,089 479,563 501,113 522,664 522,664 522,664 522,664 522,664 522,664 522,664 522,664 24 Total $ 1,530,785 $ 1,461,408 $ 1,413,836 $ 1,472,330 $ 1,530,825 $ 1,530,825 $ 1,530,825 $ 1,530,825 $ 1,530,825 $ 1,530,825 $ 1,530,825 S 1,530,825 Duplex-Domestic 25 Base Facility Charges $ 5,359 $ 5,477 $ 5,477 $ 5,477 $ 5,477 $ 5,477 $ 5,477 $ 5,477 $ 5,477 $ 5,477 $ 5,477 $ 5,477 26 Consumption Charges 6,465 6,325 6,169 6,393 6,618 6,618 6,618 6,618 6,618 6,618 6,618 6,618 27 Purchased Water Pass-Through Charges 6,708 6,149 5,997 6,216 6,434 6,434 6,434 6,434 6,434 6,434 6,434 6,434 28 Total $ 18,532 $ 17,951 $ 17,643 $ 18,086 $ 18,529 $ 18,529 $ 18,529 $ 18,529 $ 18,529 $ 18,529 $ 18,529 $ 18,529 Page 354 of 1707 • 1-17 Table 1-2 City of Miami Beach,Florida Water and Sewer Rate Study Projected Water and Sewer Retail User Rate Revenue Under Existing Rates '' �e }� .:1''':--4'.':• I e ., sr':'•'..: _'.r t 1 is i �i -.fid � n �,.,�y��ex : - �� � tY f �d v, ...� y� ll :�i A. �.. Emmintoweekammeammumum ,....,,,.:,...01..,,i..,.;..::,:::: ‘,,,:;:,.......t'-',4:!:- .. .,... .'2019":,-,,,'•:';,:e•:•;- 7-..e.;1. 14(4,32_. .... ...a3 X23 >.,... 14.4 st :i.;;F Ir 141120 ,, +28 . .2 Z9 . •20311 Duplex-Irrigation 29 Base Facility Charges $ 411 $ 420 $ 420 $ 420 $ 420 $ 420 $ 420 $ 420 $ 420 $ 420 $ 420 $ 420 30 Consumption Charges 349 615 357 357 357 357 357 357 357 357 357 357 31 Purchased Water Pass-Through Charges 260 430 249 249 249 249 249 249 249 249 249 249 32 Total $ 1,020 $ 1,465 $ 1,027 $ 1,027 $ 1,027 $ 1,027 $ 1,027 $ 1,027 $ 1,027 $ 1,027 $ 1,027 $ 1,027 Commercial-Domestic 33 Base Facility Charges $ 654,377 $ 668,763 $ 668,763 $ 668,763 $ 668,763 $ 668,763 $ 668,763 $ 668,763 $ 668,763 $ 668,763 $ 668,763 $ 668,763 34 Consumption Charges 2,512,567 2,100,890 2,257,121 2,413,473 2,569,825 2,569,825 2,569,825 2,569,825 2,569,825 2,569,825 2,569,825 2,569,825 35 Purchased Water Pass-Through Charges 2,040,423 1,600,007 1,718,990 1,838,065 1,957,140 1,957,140 1,957,140 1,957,140 1,957,140 1,957,140 1,957,140 1,957,140 36 Total $ 5,207,367 $ 4,369,660 $ 4,644,873 $ 4,920,300 $ 5,195,728 $ 5,195,728 $ 5,195,728 $ 5,195,728 $ 5,195,728 $ 5,195,728 $ 5,195,728 $ 5,195,728 Commercial-Irrigation 37 Base Facility Charges $ 153,811 $ 157,195 $ 157,195 $ 157,195 $ 157,195 $ 157,195 $ 157,195 $ 157,195 $ 157,195 $ 157,195 $ 157,195 $ 157,195 38 Consumption Charges 688,470 640,366 646,903 675,540 704,177 704,177 704,177 704,177 704,177 704,177 704,177 704,177 39 Purchased Water Pass-Through Charges 729,816 636,593 643,091 671,560 700,028 700,028 700,028 700,028 700,028 700,028 700,028 700,028 40 Total $ 1,572,097 $ 1,434,155 $ 1,447,190 $ 1,504,295 $ 1,561,400 $ 1,561,400 $ 1,561,400 $ 1,561,400 $ 1,561,400 $ 1,561,400 $ 1,561,400 $ 1,561,400 Hotel-Domestic 41 Base Facility Charges $ 185,992 $ 190,081 $ 190,081 $ 190,081 $ 190,081 $ 190,081 $ 190,081 $ 190,081 $ 190,081 $ 190,081 $ 190,081 $ 190,081 42 Consumption Charges 1,889,820 1,386,545 1,568,601 1,750,656 1,932,712 1,932,712 1,932,712 1,932,712 1,932,712 1,932,712 1,932,712 1,932,712 43 Purchased Water Pass-Through Charges 1,402,688 965,228 1,091,964 1,218,700 1,345,435 1,345,435 1,345,435 1,345,435 1,345,435 1,345,435 1,345,435 1,345,435 44 Total $ 3,478,499 $ 2,541,854 $ 2,850,646 $ 3,159,437 $ 3,468,228 $ 3,468,228 $ 3,468,228 $ 3,468,228 $ 3,468,228 $ 3,468,228 $ 3,468,228 $ 3,468,228 Hotel-Irrigation 45 Base Facility Charges $ 38,096 $ 38,934 $ 38,934 $ 38,934 $ 38,934 $ 38,934 $ 38,934 $ 38,934 $ 38,934 $ 38,934 $ 38,934 $ 38,934 46 Consumption Charges 1,119,365 546,012 740,538 942,531 1,144,523 1,144,523 1,144,523 1,144,523 1,144,523 1,144,523 1,144,523 1,144,523 47 Purchased Water Pass-Through Charges 496,515 227,202 308,146 392,198 476,249 476,249 476,249 476,249 476,249 476,249 476,249 476,249 48 Total $ 1,653,976 $ 812,148 $ 1,087,618 $ 1,373,662 $ 1,659,706 $ 1,659,706 $ 1,659,706 $ 1,659,706 $ 1,659,706 $ 1,659,706 $ 1,659,706 $ 1,659,706 City-Domestic 49 Base Facility Charges $ 67,829 $ 69,321 $ 69,321 $ 69,321 $ 69,321 $ 69,321 $ 69,321 $ 69,321 $ 69,321 $ 69,321 $ 69,321 $ 69,321 50 Consumption Charges 197,131 203,285 184,777 193,226 201,674 201,674 201,674 201,674 201,674 201,674 201,674 201,674 51 Purchased Water Pass-Through Charges 171,895 166,195 151,064 157,971 164,878 164,878 164,878 164,878 164,878 164,878 164,878 164,878 52 Total $ 436,855 $ 438,801 $ 405,163 $ 420,519 $ 435,874 $ 435,874 $ 435,874 $ 435,874 $ 435,874 $ 435,874 $ 435,874 $ 435,874 City-Irrigation 53 Base Facility Charges $ 310,691 $ 317,536 $ 317,536 $ 317,536 $ 317,536 $ 317,536 $ 317,536 $ 317,536 $ 317,536 $ 317,536 $ 317,536 $ 317,536 54 Consumption Charges 1,080,199 1,029,843 1,007,404 1,056,035 1,104,666 1,104,666 1,104,666 1,104,666 1,104,666 1,104,666 1,104,666 1,104,666 55 Purchased Water Pass-Through Charges 647,563 579,060 566,444 593,788 621,132 621,132 621,132 621,132 621,132 621,132 621,132 621,132 56 Total $ 2,038,454 $ 1,926,440 $ 1,891,384 $ 1,967,359 $ 2,043,335 $ 2,043,335 $ 2,043,335 $ 2,043,335 $ 2,043,335 $ 2,043,335 $ 2,043,335 $ 2,043,335 Page 355 of 1707 1-18 Table 1-2 City of Miami Beach,Florida Water and Sewer Rate Study Proiccted Water and Sewer Retail User Rate Revenue Under Existing Rates !lI;'`'..,,...."0.A.7.,!,,',. fi t' J vl,,,; f- ,.:20/01.0641,>. ! ! ,,,y �t r` 1 I14k' 2,. Vii SAI1. 0', ` der{• ts1 Y f•'4 , ' y ' x <1 2;r, r o . W _I tip 7, TMn 2! 7'" ."lit 1,• - I i21/M `I '!, 2029 2030 � IUr.I'14$6140011.!:'.°:, ,. -''a:.�.s,�I,.�s, <.. ,. . 2019 . ..Z M ,!qa::n'd �rr..,s.i � ��C� 4.s,�.,:, n.. .. ,. T. Total Water User Rate Revenue 57 Base Facility Charges $ 3,409,714 $ 3,484,633 $ 3,484,633 $ 3,484,633 $ 3,484,633 $ 3,484,633 $ 3,484,633 $ 3,484,633 $ 3,484,633 $ 3,484,633 $ 3,484,633 $ 3,484,633 58 Consumption Charges 18,499,814 16,266,278 16,695,478 17,528,804 18,362,131 18,362,131 18,362,131 18,362,131 18,362,131 18,362,131 18,362,131 18,362,131 59 Purchased Water Pass-Through Charges 13,447,363 11,586,991 11,835,568 12,367,030 12,898,491 12,898,491 12,898,491 12,898,491 12,898,491 12,898,491 12,898,491 12,898,491 60 Total $35,356,891 $31,337,902 $32,015,679 $33,380,467 $34,745,255 $34,745,255 $34,745,255 $34,745,255 $34,745,255 $34,745,255 $34,745,255 $34,745,255 SEWER USER RATE REVENUE Residential-Domestic 61 Base Facility Charges $ 548,431 $ 560,632 $ 560,632 $ 560,632 $ 560,632 $ 560,632 S 560,632 $ 560,632 $ 560,632 $ 560,632 $ 560,632 $ 560,632 62 Consumption Charges 2,829,895 2,935,171 2,887,662 2,890,014 2,892,365 2,892,365 2,892,365 2,892,365 2,892,365 2,892,365 2,892,365 2,892,365 63 Purchased Sewer Pass-Through Charges 3,323,409 3,493,043 3,436,505 3,439,303 3,442,102 3,442,102 3,442,102 3,442,102 3,442,102 3,442,102 3,442,102 3,442102 64 Total $ 6,701,735 $ 6,988,846 $ 6,884,798 $ 6,889,949 $ 6,895,099 $ 6,895,099 $ 6,895,099 $ 6,895,099 $ 6,895,099 $ 6,895,099 $ 6,895,099 $ 6,895,099 Apartment-Domestic 65 Base Facility Charges $ 371,715 $ 379,896 $ 379,896 $ 379,896 $ 379,896 $ 379,896 $ 379,896 $ 379,896 $ 379,896 $ 379,896 $ 379,896 $ 379,896 66 Consumption Charges 2,592,344 2,486,399 2,535,607 2,592,588 2,649,570 2,649,570 2,649,570 2,649,570 2,649,570 2,649,570 2,649,570 2,649,570 67 Purchased Sewer Pass-Through Charges 3,044,430 2,958,976 3,017,536 3,085,348 3,153,160 3,153,160 3,153,160 3,153,160 3,153,160 3,153,160 3,153,160 3,153,160 68 Total $ 6,008,490 $ 5,825,271 $ 5,933,039 $ 6,057,832 $ 6,182,626 $ 6,182,626 $ 6,182,626 $ 6,182,626 $ 6,182,626 $ 6,182,626 $ 6,182,626 $ 6,182,626 Condominium-Domestic 69 Base Facility Charges $ 781,479 $ 798,694 $ 798,694 $ 798,694 $ 798,694 $ 798,694 $ 798,694 $ 798,694 $ 798,694 $ 798,694 $ 798,694 $ 798,694 70 Consumption Charges 8,147,447 8,211,811 8,049,396 8,188,349 8,327,303 8,327,303 8,327,303 8,327,303 8,327,303 8,327,303 8,327,303 8,327,303 71 Purchased Sewer Pass-Through Charges 9,568,304 9,772,587 _ 9,579,302 9,744,666 9,910,030 9,910,030 9,910,030 9,910,030 9,910,030 9,910,030 9,910,030 9,910,030 72 Total $18,497,231 $18,783,092 $18,427,392 $18,731,709 $19,036,026 $19,036,026 $19,036,026 $19,036,026 $19,036,026 $19,036,026 $19,036,026 $19,036,026 Duplex-Domestic 73 Base Facility Charges $ 5,351 $ 5,469 $ 5,469 $ 5,469 $ 5,469 $ 5,469 $ 5,469 $ 5,469 $ 5,469 $ 5,469 $ 5,469 $ 5,469 74 Consumption Charges 14,119 13,681 13,399 13,915 14,431 14,431 14,431 14,431 14,431 14,431 14,431 14,431 75 Purchased Sewer Pass-Through Charges 16,581 16,281 15,945 16,559 17,173 17,173 17,173 17,173 17,173 17,173 17,173 17,173 76 Total $ 36,051 $ 35,431 $ 34,813 $ 35,943 $ 37,073 $ 37,073 $ 37,073 $ 37,073 $ 37,073 $ 37,073 $ 37,073 $ 37,073 Commercial-Domestic 77 Base Facility Charges $ 707,636 $ 723,232 $ 723,232 $ 723,232 $ 723,232 $ 723,232 $ 723,232 $ 723,232 $ 723,232 $ 723,232 $ 723,232 $ 723,232 78 Consumption Charges 4,437,483 3,712,603 3,986,730 4,261,085 4,535,441 4,535,441 4,535,441 4,535,441 4,535,441 4,535,441 4,535,441 4,535,441 79 Purchased Sewer Pass-Through Charges 5,211,349 4,418,238 4,744,467 5,070,968 5,397,468 5,397,468 5,397,468 5,397,468 5,397,468 5,397,468 5,397,468 5,397,468 80 Total $10,356,467 $ 8,854,072 $ 9,454,430 $10,055,285 $10,656,141 $10,656,141 $10,656,141 $10,656,141 $10,656,141 $10,656,141 $10,656,141 $10,656,141 Hotel-Domestic 81 Base Facility Charges $ 210,613 $ 215,254 $ 215,254 $ 215,254 $ 215,254 $ 215,254 $ 215,254 $ 215,254 $ 215,254 $ 215,254 $ 215,254 $ 215,254 82 Consumption Charges 3,220,034 2,361,113 2,671,114 2,981,115 3,291,116 3,291,116 3,291,116 3,291,116 3,291,116 3,291,116 3,291,116 3,291,116 83 Purchased Sewer Pass-Through Charges 3,781,585 2,809,877 3,178,799 3,547,720 3,916,641 3,916,641 3,916,641 3,916,641 3,916,641 3,916,641 3,916,641 3,916,641 84 Total $ 7,212,231 $ 5,386,244 $ 6,065,167 $ 6,744,089 $ 7,423,011 $ 7,423,011 $ 7,423,011 $ 7,423,011 $ 7,423,011 $ 7,423,011 $ 7,423,011 $ 7,423,011 Page 356 of 1707 I 1-19 Table 1-2 City of Miami Beach,Florida Water and Sewer Rate Study Projected Water and Sewer Retail User Rate Revenue Under Existing Rates t �tetA eT. 2819 Si 1, ,,: 2022 .. 2t1 1 2024 ®23 " 2026 202 '2028 2029 2030 City-Domestic 85 Base Facility Charges $ 77,160 $ 78,861 $ 78,861 $ 78,861 $ 78,861 $ 78,861 $ 78,861 $ 78,861 $ 78,861 $ 78,861 $ 78,861 $ 78,861 86 Consumption Charges 397,210 253,706 301,099 353,539 405,979 405,979 405,979 405,979 405,979 405,979 405,979 405,979 87 Purchased Sewer Pass-Through Charges 466,481 301,926 358,328 420,734 483,141 483,141 483,141 483,141 483,141 483,141 483,141 483,141 88 Total $ 940,852 $ 634,493 $ 738,288 $ 853,134 $ 967,981 $ 967,981 $ 967,981 $ 967,981 $ 967,981 $ 967,981 $ 967,981 $ 967,981 Total Sewer User Rate Revenue 89 Base Facility Charges $ 2,702,385 $ 2,762,037 $ 2,762,037 $ 2,762,037 $ 2,762,037 $ 2,762,037 $ 2,762,037 $ 2,762,037 $ 2,762,037 $ 2,762,037 $ 2,762,037 $ 2,762,037 90 Consumption Charges 21,638,532 19,974,483 20,445,006 21,280,605 22,116,204 22,116,204 22,116,204 22,116,204 22,116,204 22,116,204 22,116,204 22,116,204 91 Purchased Sewer Pass-Through Charges 25,412,140 23,770,929 24,330,882 25,325,299 26,319,716 26,319,716 26,319,716 26,319,716 26,319,716 26,319,716 26,319,716 26,319,716 92 Total $49,753,057 $46,507,450 $47,537,926 $49,367,941 $51,197,957 $51,197,957 $51,197,957 $51,197,957 $51,197,957 $51,197,957 $51,197,957 $51,197,957 TOTAL USER RATE REVENUE 93 RECOGNIZED $85,109,948 $77,845,352 $79,553,605 $82,748,409 $85,943,213 $85,943,213 $85,943,213 $85,943,213 $85,943,213 $85,943,213 $85,943,213 $85,943,213 Page 357 of 1707 1-20 Table 1-3 • City of Miami Beach,Florida Water and Sewer Rate Study Water System Development of Net Revenue Requirements from User Rates and Projected Revenue Adjustments-Water System i ;'e 11eea1 ear Endin Se tember30 , Aio. .Detaription2020 2021 . 2022 2023 2024 2025 2026 2027 2028 2029 2030 Operating Expenses I Water System Expenses(425-0410) $ 26,602,120 $ 26,719,579 $ 27,845,551 $ 28,972,514 $ 29,396,145 $ 29,832,667 $ 30,207,890 $ 30,595,091 $ 30,992,741 $ 31,403,244 $ 31,823,947 2 Total Operating Expenses $ 26,602,120 $ 26,719,579 $ 27,845,551 $ 28,972,514 $ 29,396,145 $ 29,832,667 $ 30,207,890 $ 30,595,091 $ 30,992,741 $ 31,403,244 $ 31,823,947 Debt Service Water and Sewer Revenue Refunding Bonds,Taxable 3 Series 2009.1-1A $ 1,238,831 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Water and Sewer Revenue Refunding Bonds,Taxable 4 Series 2009.1-1B 184,500 - - - - - - - - - Water and Sewer Revenue Refunding Bonds,Taxable 5 Series 2009J-IC 553,500 - - - - - - - - - - Water and Sewer Revenue and Revenue Refunding 6 Bonds,Series 2017 2,831,378 2,791,854 2,722,154 2,722,052 2,722,564 4,191,389 4,193,234 3,550,047 3,548,407 3,548,714 3,548,612 Water and Sewer Revenue Refunding Bonds,Series 7 2020 - 217,464 326,196 1,174,527 1,171,596 311,928 311,518 343,580 344,544 345,466 346,348 8 Series 2022 Bonds - - 864,889 1,496,924 1,496,924 1,496,924 1,496,924 1,496,924 1,496,924 1,496,924 1,496,924 9 Total Debt Service $ 4,808,209 $ 3,009,318 $ 3,913,239 $ 5,393,502 $ 5,391,083 $ 6,000,241 $ 6,001,676 $ 5,390,550 $ 5,389,874 $ 5,391,104 $ 5,391,883 Other Revenue Requirements 10 Transfer to Capital Replacement and Improvement Fun $ 4,358,980 $ 2,055,300 $ 1,554,907 $ 763,582 $ 3,447,234 $ - $ 7,682,000 $ 5,400,000 $ 22,820,000 $ 3,618,000 $ 3,618,000 11 Capital Funded from Rates 645,000 1,472,000 685,804 614,000 627,870 659,338 479,867 739,126 739,126 739,126 739,126 12 Total Other Revenue Requirements $ 5,003,980 $ 3,527,300 $ 2,240,711 $ 1,377,582 $ 4,075,104 $ 659,338 $ 8,161,867 $ 6,139,126 $ 23,559,126 $ 4,357,126 $ 4,357,126 13 Gross Revenue Requirements $ 36,414,308 $ 33,256,197 $ 33,999,502 $ 35,743,598 $ 38,862,332 $ 36,492,245 $ 44,371,433 $ 42,124,767 $ 59,941,740 $ 41,151,474 $ 41,572,955 Less Income and Funds from Other Sources 14 Other Operating Revenue $ 783,905 $ 786,905 $ 786,905 $ 786,905 $ 786,905 $ 786,905 $ 786,905 $ 786,905 $ 786,905 $ 786,905 $ 786,905 15 Unrestricted Interest Income 317,103 301,344 326,922 369,526 415,125 451,963 472,505 464,465 475,674 416,440 436,717 16 Impact Fees Used to Pay City Debt Service 411,881 - - - - - - - - - - 18 Net Revenue Requirements $ 34,901,420 $ 32,167,948 $ 32,885,674 $ 34,587,167 $ 37,660,302 $ 35,253,377 $ 43,112,022 $ 40,873,396 $ 58,679,161 $ 39,948,129 $ 40,349,333 Revenue from Existing Rates 19 Water System Rate Revenue $ 31,337,902 $ 32,015,679 $ 33,380,467 $ 34,745,255 $ 34,745,255 $ 34,745,255 $ 34,745,255 $ 34,745,255 $ 34,745,255 $ 34,745,255 $ 34,745,255 20 Prior Year Rate Adjustment - - 1,168,300 2,474,700 3,777,400 5,125,700 6,521,200 6,857,900 7,204,700 7,546,500 7,898,800 21 Total Applicable Rate Revenue $ 31,337,902 $ 32,015,679 $ 34,548,767 $ 37,219,955 $ 38,522,655 $ 39,870,955 $ 41,266,455 $ 41,603,155 $ 41,949,955 $ 42,291,755 $ 42,644,055 22 Rate Adjustments 0.00% 3.50% 3.50% 3.50% 3.50% 3.50% 0.82% 0.83% 0.81% 0.83% 0.85% 23 Effective Months 12 9 12 12 12 12 12 12 12 12 12 24 Percent of Current Year Effective 100.0% 75.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 25 Revenue from Current Rate Adjustment $ - $ 840,400 $ 1,209,200 $ 1,302,700 $ 1,348,300 $ 1,395,500 $ 336,700 $ 346,800 $ 341,900 $ 352,300 $ 363,200 26 Total Rate Revenue $ 31,337,902 $ 32,856,079 $ 35,757,967 $ 38,522,655 $ 39,870,955 $ 41,266,455 $ 41,603,155 $ 41,949,955 $ 42,291,855 $ 42,644,055 $ 43,007,255 27 Revenue Surplus/(Deficiency)Under Proposed Rates $ (3,563,517) $ 688,131 $ 2,872,293 $ 3,935,489 $ 2,210,653 $ 6,013,079 $ (1,508,867) $ 1,076,559 $(16,387,305) $ 2,695,927 $ 2,657,923 age 358 o 1-21 Table 1-4 City of Miami Beach,Florida Water and Sewer Rate Study Sewer System Development of Net Revenue Requirements from User Rates and Projected Revenue Adjustments-Sewer System Fiscu1 Year Endht:Se ember 30, `IIIb.:.Dcserlptlon 2020 1021 . • 2022 2023 2024 . 2029 2026 2027 2028 2029 2030 Operating Expenses I Sewer System Expenses(425-0420) $ 39,507,077 $ 39,888,871 $ 41,280,476 $ 42,678,101 $ 43,063,440 $ 43,458,324 $ 43,838,884 $ 44,231,455 $ 44,633,347 $ 45,048,143 $ 45,471,701 2 Total Operating Expenses $ 39,507,077 $ 39,888,871 $ 41,280,476 $ 42,678,101 $ 43,063,440 $ 43,458,324 $ 43,838,884 $ 44,231,455 $ 44,633,347 $ 45,048,143 $ 45,471,701 Debt Service Water and Sewer Revenue Refunding Bonds,Taxable 3 Series 20091-1A $ 1,782,707 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Water and Sewer Revenue Refunding Bonds,Taxable 4 Series 2009J-1B 265,500 - - - - - - - - - - Water and Sewer Revenue Refunding Bonds,Taxable 5 Series 20093-IC 796,500 - - - - - - - - - - Water and Sewer Revenue and Revenue Refunding 6 Bonds,Series 2017 4,074,422 4,017,546 3,917,246 3,917,099 3,917,836 6,031,511 6,034,166 5,108,604 5,106,244 5,106,686 5,106,539 Water and Sewer Revenue Refunding Bonds,Series 7 2020 - 312,936 469,404 1,690,173 1,685,955 448,872 448,282 494,420 495,807 497,134 498,403 8 Series 2022 Bonds - - 598,478 1,035,826 1,035,826 1,035,826 1,035,826 1,035,826 1,035,826 1,035,826 1,035,826 9 Total Debt Service $ 6,919,129 $ 4,330,482 $ 4,985,128 $ 6,643,098 $ 6,639,617 $ 7,516,209 $ 7,518,274 $ 6,638,850 $ 6,637,876 $ 6,639,646 $ 6,640,767 Other Revenue Requirements 10 Transfer to Capital Replacement and Improvement Fund $ 2,475,365 $ 2,861,500 $ 2,924,845 $ 2,389,091 $ 2,438,263 $ 8,999,500 $ 8,272,000 $ 7,377,000 $ 6,455,000 $ 6,924,000 $ 4,895,600 II Capital Funded from Rates 25,000 1,218,000 332,444 58,313 1,388,573 666,366 291,578 568,468 568,468 568,468 568,468 12 Total Other Revenue Requirements $ 2,500,365 $ 4,079,500 $ 3,257,289 $ 2,447,404 $ 3,826,836 $ 9,665,866 $ 8,563,578 $ 7,945,468 $ 7,023,468 $ 7,492,468 $ 5,464,068 13 Gross Revenue Requirements $ 48,926,571 $ 48,298,853 $ 49,522,893 $ 51,768,603 $ 53,529,893 $ 60,640,400 $ 59,920,736 $ 58,815,773 $ 58,294,691 $ 59,180,257 $ 57,576,536 Less Income and Funds from Other Sources 14 Other Operating Revenue $ 3,584,595 $ 3,599,595 $ 3,599,595 $ 3,599,595 $ 3,599,595 $ 3,599,595 $ 3,599,595 $ 3,599,595 $ 3,599,595 $ 3,599,595 $ 3,599,595 15 Unrestricted Interest Income 474,253 449,887 473,712 522,333 575,552 614,973 642,458 631,546 646,542 567,288 594,419 16 Impact Fees Used to Pay City Debt Service 624,464 - - - - - - - - - - 17 Net Revenue Requirements $ 44,243,259 $ 44,249,371 $ 45,449,586 $ 47,646,675 $ 49,354,746 $ 56,425,832 $ 55,678,684 $ 54,584,633 $ 54,048,554 $ 55,013,374 $ 53,382,522 Revenue from Existing Rates 18 Wastewater System Rate Revenue $ 46,507,450 $ 47,537,926 $ 49,367,941 $ 51,197,957 $ 51,197,957 $ 51,197,957 $ 51,197,957 $ 51,197,957 $ 51,197,957 $ 51,197,957 $ 51,197,957 19 Prior Year Rate Adjustment 794,800 1,604,600 2,396,700 3,200,600 4,016,600 4,467,000 4,931,000 5,388,400 5,859,800 20 Total Applicable Rate Revenue $ 46,507,450 $ 47,537,926 $ 50,162,741 $ 52,802,557 $ 53,594,657 $ 54,398,557 $ 55,214,557 $ 55,664,957 $ 56,128,957 $ 56,586,357 $ 57,057,757 21 Rate Adjustments 0.00% 1.61% 1.50% 1.50% 1.50% 1.50% 0.82% 0.83% 0.81% 0.83% 0.85% 22 Effective Months 12 9 12 12 12 12 12 12 12 12 12 23 Percent of Current Year Effective 100.0% 75.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 24 Revenue from Current Rate Adjustment $ - $ 574,000 $ 752,400 $ 792,000 $ 803,900 $ 816,000 $ 450,400 $ 464,000 $ 457,400 $ 471,400 $ 485,900 25 Total Rate Revenue $ 46,507,450 $ 48,111,926 $ 50,915,141 $ 53,594,557 $ 54,398,557 $ 55,214,557 $ 55,664,957 $ 56,128,957 $ 56,586,357 $ 57,057,757 $ 57,543,657 26 Revenue Surplus/(Deficiency)Under Proposed Rates $ 2,264,190 $ 3,862,555 $ 5,465,555 $ 5,947,882 $ 5,043,811 $ (1,211,275) $ (13,727) $ 1,544,324 $ 2,537,803 $ 2,044,383 $ 4,161,135 Page 359 of 1707 1-22 Table 1-5 City of Miami Beach,Florida Water and Sewer Rate Study Combined Water and Wastewater System Projected Net Revenue'Requirements-Combined Water and Sewer System 1 ,,'".,? a :r,e r,., ^;• ' . ,:;, ; 7-*-, - k`';, • `•Th sJ%etlt'1i titjju 'SE:6411W 46'•` ., . r 5'seiititiou . "a . +'... 29,20:+. 3 . Ib21 ' 2022 .,.,:-2923 :,:•;';:-.`.,10.4; .' ..":'.202.5..' - ';3026 - 2027 •.. .2O28 2029, 2030 ' Operating Expenses 1 Water System Expenses(425-0410) $ 26,602,120 $ 26,719,579 $ 27,845,551 $ 28,972,514 $ 29,396,145 $ 29,832,667 $ 30,207,890 $ 30,595,091 $ 30,992,741 $ 31,403,244 $ 31,823,947 2 Wastewater Division-5300 39,507,077 39,888,871 41,280,476 42,678,101 43,063,440 43,458,324 43,838,884 44,231,455 44,633,347 45,048,143 45,471,701 3 Total Operating Expenses $ 66,109,197 $ 66,608,450 $ 69,126,028 $ 71,650,615 $ 72,459,585 $ 73,290,991 $ 74,046,774 $ 74,826,547 $ 75,626,087 $ 76,451,388 $ 77,295,648 Debt Service Water and Sewer Revenue Refunding Bonds,Taxable Series 4 2009J-1A $ 3,021,538 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Water and Sewer Revenue Refunding Bonds,Taxable Series 5 2009J-1B 450,000 - - - - - - - - - - Water and Sewer Revenue Refunding Bonds,Taxable Series 6 2009J-IC 1,350,000 - - - - - - - - - - Water and Sewer Revenue and Revenue Refunding Bonds, 7 Series 2017 6,905,800 6,809,400 6,639,400 6,639,150 6,640,400 10,222,900 10,227,400 8,658,650 8,654,650 8,655,400 8,655,150 8 Water and Sewer Revenue Refunding Bonds,Series 2020 - 530,400 795,600 2,864,700 2,857,550 760,800 759,800 838,000 840,350 842,600 844,750 9 Series 2022 Bonds - - 1,463,367 2,532,750 2,532,750 2,532,750 2,532,750 2,532,750 2,532,750 2,532,750 2,532,750 10 Total Debt Service $ 11,727,338 $ 7,339,800 $ 8,898,367 $ 12,036,600 $ 12,030,700 $ 13,516,450 $ 13,519,950 $ 12,029,400 $ 12,027,750 $ 12,030,750 $ 12,032,650 Other Revenue Requirements 11 Transfer to Capital Replacement Fund $ 6,834,345 $ 4,916,800 $ 4,479,752 $ 3,152,672 $ 5,885,497 $ 8,999,500 $ 15,954,000 $ 12,777,000 $ 29,275,000 $ 10,542,000 $ 8,513,600 12 Capital Funded from Rates 670,000 2,690,000 1,018,248 672,313 2,016,443 1,325,704 771,445 1,307,593 1,307,593 1,307,593 1,307,593 13 Total Other Revenue Requirements $ 7,504,345 $ 7,606,800 $ 5,498,000 $ 3,824,985 $ 7,901,940 $ 10,325,204 $ 16,725,445 $ 14,084,593 $ 30,582,593 $ 11,849,593 $ 9,821,193 14 Gross Revenue Requirements $ 85,340,880 $ 81,555,050 $ 83,522,394 $ 87,512,201 $ 92,392,226 $ 97,132,645 $104,292,169 $100,940,540 $118,236,431 $100,331,731 $ 99,149,491 Less Income and Funds from Other Sources 15 Other Operating Revenue $ 4,368,500 $ 4,386,500 $ 4,386,500 $ 4,386,500 $ 4,386,500 $ 4,386,500 $ 4,386,500 $ 4,386,500 $ 4,386,500 $ 4,386,500 $ 4,386,500 16 Unrestricted Interest Income 791,356 751,231 800,634 891,858 990,677 1,066,936 1,114,963 1,096,011 1,122,216 983,728 1,031,136 17 Impact Fees Used to Pay City Debt Service 1,036,345 - - - - - - - - - - 19 Net Revenue Requirements $ 79,144,679 $ 76,417,319 $ 78,335,260 $ 82,233,842 $ 87,015,048 $ 91,679,209 $ 98,790,706 $ 95,458,029 $112,727,715 $ 94,961,503 $ 93,731,855 Revenue from Existing Rates 20 System Rate Revenue $ 77,845,352 $ 79,553,605 $ 82,748,409 $ 85,943,213 $ 85,943,213 $ 85,943,213 $ 85,943,213 $ 85,943,213 $ 85,943,213 $ 85,943,213 $ 85,943,213 21 Prior Year Rate Adjustment - - 1,963,100 4,079,300 6,174,100 8,326,300 10,537,800 11,324,900 12,135,700 12,934,900 13,758,600 22 Total Applicable Rate Revenue $ 77,845,352 $ 79,553,605 $ 84,711,509 $ 90,022,513 $ 92,117,313 $ 94,269,513 $ 96,481,013 $ 97,268,113 $ 98,078,913 $ 98,878,113 $ 99,701,813 23 Effective Months 12 9 12 12 12 12 12 12 12 12 12 24 Percent of Current Year Effective 100.0% 75.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 25 Revenue from Current Rate Adjustment w/Effective Months $ - $ 1,414,400 $ 1,961,600 $ 2,094,700 $ 2,152,200 $ 2,211,500 $ 787,100 $ 810,800 $ 799,300 $ 823,700 $ 849,100 26 Revenue from Current Rate Adjustment w/Full Year Implemental $ - $ 1,885,867 $ 1,961,600 $ 2,094,700 $ 2,152,200 $ 2,211,500 $ 787,100 $ 810,800 $ 799,300 $ 823,700 $ 849,100 27 Total Revenue w/Effective Months $ 77,845,352 $ 80,968,005 $ 86,673,109 $ 92,117,213 $ 94,269,513 $ 96,481,013 $ 97,268,113 $ 98,078,913 $ 98,878,213 $ 99,701,813 $100,550,913 28 Total Revenue w/Full Year Implementation $ 77,845,352 $ 81,439,471 $ 86,673,109 $ 92,117,213 $ 94,269,513 $ 96,481,013 $ 97,268,113 $ 98,078,913 $ 98,878,213 $ 99,701,813 $100,550,913 29 Revenue Adjustment w/Effective Months 0.00% 1.78% 2.32% 2.33% 2.34% 2.35% 0.82% 0.83% 0.81% 0.83% 0.85% 30 Revenue Adjustment w/Full Year Implementation 0.00% 2.37% 2.32% 2.33% 2.34% 2.35% 0.82% 0.83% 0.81% 0.83% 0.85% Page 360 of 1707 1-23 Tablel-6 City of Miami Beach,Florida Water and Sewer Rule Study Water and Sewer System l tilih'Ifnd,et and Allocation of Utility.()11cratin0 Expenses to Indisidiml Systems Aman;,, Retell` Aerial. AeNal" i Madgktn ' AtOewd • B5g716nu1 ,... AdJder7d - .. .. Allocation Amounts Erptise CAFR Espessse? Pbeal Year (baa Yep. Meal Year F11svl Year Fbcel Year lebal Year Fiscal Year Fiscal Tarr Fiscal Year nut)Year 2020 Flue Year 2071 Ito. .:('e lkserlpllen C7aeetlkaelon I Yes er Noy 2*04 • 1016 . 2017 y 7818 2019 2870 MIJariniefits 2020 2021 .Aditalmeab 2021 Weir Wastewater Water W'arreweter Water System Expenses(415-0410) Personnel Services I I I Salaries and Wages Personal Services Yes f 2.735.224 S 2,863,333 S 2,801,076 S 2,572,256 5 2.590,809 S 2.864,000 S - S 2,864.000 0 2,844,000 5 • 5 2,844.000 S 2,864.000 S - S 2,044,000 5 - 2 32 Shift Differential Personal Services Yes 4.000 3.755 3.428 2.050 8,835 3,000 - 3,000 3,000 - 3,000 3,000 3,000 - 3 AddPers Additional Personnel Personal Services Yes - - - - - - - - - - - - - - 4 33 Steeplejack Personal Services Yes 21 - - - - - - - - - - - - - 5 35 Ovenime Peevond Services Yes 179.101 272.886 383,444 172,145 198,911 181,000 - 181,000 20,000 - 20,000 181,000 - 20,000 - 6 36 _ Holiday Pay-Overtime Personal Services Yes 22.199 12,310• 13,116 9241 5,352 12,000 - 12,000 12,000 - 12,000 12,000 - 12,000 - 7 39 Work Above Classification Personal Services Yes 9,082 3,625 5.863 3,008 2,707 3,000 - 3.000 3,000 - 3,000 3400 - 3.000 • 8 53 Allowances Personal Services Yes 253,540 254.661 262,887 138,408 135,934 142,000 - 142,000 145,000 - 145.000 142.000 - 145,000 - 9 54 Uniforms Personal Services Yes 22,455 29.594 28,049 26,444 27.471 - - - - . - - 10 59 Transfers•Pension Obligation Nan-Operating No 17,000 16,000 16,000 12,000 12,000 13,000 • 13,000 4,000 - 4,000 13.000 - 4,000 - II 60 401A Pension Contribution Personal Services Ycs 12.109 12.498 12,953 13,391 13.334 13.000 - 13.000 13,000 - 13.000 13,000 - 13.000 - 12 61 Retirement Contributions-Pension Personal Services Yes 812.000 827,000 867,000 825,000 784,000 820000 - 820,000 833,000 - 833,000 820,000 - 837.000 - 13 62 Health and Life Insurance Personal Services Yes 431,131 406.808 417.729 381,020 422,466 496,000 - 496,000 487.000 - 487,000 496,000 . 487,000 - 14 63 Workmen's Compensation Personal Services Yes 37.000 4,000 4,000 3.000 3.000 3.000 . 3.000 1.000 - 1,000 3,000 - 1.000 - 15 64 FICA Personal Services Yes - 3,786 10.316 5,457 6,209 5.000 • 5.000 5.000 - 5,000 5,000 - 5.000 - 16 65 Social Security and Medicare Personal Services Yes 41,074 44,558 47,749 38.917 40.107 47,000 - 47,000 47,000 - 47.000 47,000 - 47,000 - 17 67 OPER Contributions Personal Services Yes 3.283 7,387 45,812 16,000 46,000 70,000 - 70,000 74.000 - 74,000 70,000 - 74000 - 18 68 OPEB PayGo Personal Services Yes i 387.000 215,000 252,000 231,000 277,000 299.000 - 299.000 291,000 - 291.000 299.000 - 291,000 - 19 69 GASB 68-Actuarial Expense Personal Services Yes 517.810 145.061 109.429 1590,257) (78.913) - - - - - - - - - - 20 70 GASB 75.OPER Expense Personal Services Yes - - - (247,559) 66,914 - - - - - - - - - - 21 307 Employee Fringe Benefits Personal Services Yes - - - - - - - - - - - - - - - 22 Total Personnel Services S 5.484.030 5 5.122.261 5 5,276449 5 7.611,520 5 4.562.135 S 4.971.000 5 - S 4,971.000 S 4,782,000 5 - S 4,782.000 5 4.971.000 S - 5 4,782,000 5 - Operating Expenses 23 711 Temporary Labor Contreclual Services Yes 5 38.838 5 13.969 S 8,637 3 27,338 5 0623 0 3,000 5 - S 3,000 5 9,000 S - S 9,000 f 3,000 f - 5 9000 S - 24 312 Professional Services Contractual Services Yes 159380 225,393 192,058 175,086 719.186 1,210,000 - 1,210,000 460,000 - 460,000 1,210,000 - 460,000 - 25 313 Bank Fees Other Operating Yes 191.242 146.172 190.000 - 190,000 111000 - 1)1000 190.000 - 111,000 - 26 314 Electricity Utilities Yes 214.506 237,379 297,499 316,904 329,896 320.000 - 720,000 347,000 - 347,000 320,000 - 347,000 - 27 316 Telephone Utilities Yes 18,035 24,453 21,892 33,446 30,554 31000 - 33,000 33,000 • 33,000 33,000 - 33.000 - 28 317 Water Utilities Yes 957 995 6.438 605 628 19000 - 19,000 1,000 - 1000 19,000 - 1.000 - 29 318 Sewer Charges Utilities Yes 5.384 10.770 10,105 447 466 - - - - - - - - - 30 319 Sanitation Fees Utilities Yes - - - - 2,000 - 2,000 - - - 2,000 - - 31 321 Postage end Shipping Contmclual Services Yes 3000 16 14.412 66 47 200 - 200 200 - 200 200 - 200 - 32 322 Administration Fees Administrative Fees Yes 1,479.000 1529.004 1,473,000 754.000 704,000 1.195.000 - 1.195,000 1.195.000 - 1.195400 1.195.000 . 1,195,000 - 33 323 Rent-Building and Equipment Contractual Services Yes 14,194 8.992 9.556 3,715 7,000 - 7.000 4,000 - 4,000 7,000 - 4,000 - 34 324 Printing-External Contactual Services Yes 700 - 13,521 28,287 25,494 31,000 - 31,000 27403 - 27,000 31.000 - 27,000 - 35 725 Contract Maintenance Contractual Services Yes 20,671 134.226 659,692 413,434 949,368 492.000 - 492,000 492.000 - 492,000 492,000 - 492.000 - 36 326 Supplies-Other Other Operating Yes - - - - - . - - - - - - - - 77 326 Suppliies-Other Operating Supplies Ycs 7.551 1.919 8,577 30,848 77.046 - - - - - - - - - - 38 327 Advertising Contrsmual Services Yes - - 249 - 250 500 - 500 1,000 - 1.000 500 - 11300 - 39 329 Storm Water Utilities Yes 59,229 53.844 66,060 90,311 93,489 - - - - - - - - • 40 331 Supplies-Information Technology Other Operating Yes 2.431 7,626 6.422 7,361 936 4.000 - 4,000 4.000 - 4000 4400 - 41300 - 41 336 Water for Resale Contractual Services Yes 14.258.442 11.357,541 12.931.844 14,073,944 12,634,985 11,605.000 709,156 12,314,156 13,357,000 (2,566) 13354434 12314.156 - 13,354.434 - 42 336TU WASP True-Up-Water Contractual Services Yes - - - - - - - - - - - - - - - 43 341 Supplies-Office Operating Supplies Yes 8.443 7.907 9,991 6.898 3432 7,000 - 7,000 7,000 - 7.000 7,000 - 7,000 - 44 342RM Repaies/Meimenance Supply Operating Supplies Yes - - - - - • - - - - - - - - 45 342 Contracted Services-Repair and Maintenance Contractual Services Yes 238,435 (196.428) 601,232 1,000.128 70.907 - - - - - - - - - - 46 343 Other Operating Expenditures Other Operating Yes 266.643 287216 196,810 42,906 426,772 832,000 - 872,000 800,000 - 800.00D 832.000 - 800,000 - 47 349 Other Contractual Services(DERM) Contractual Services Yes 2,360366 2.669.096 2,788,052 2,803,547 2477,958 2.112,000 (231.726) 1,880,274 1,963,000 8,365 1,971,365 1,880,274 - 1,971,365 - 48 350 Capital Repairs and Maintenance Other Operating Yes - - - - - - - - - - - • 49 351 Engine Fuel and Lubricants Other Operating Yes - 3,459 - - 2499 4,000 • 4,000 20,000 - 20,000 4,000 - 20.000 - 50 356 Contingencies Contingency Yes - - - - 1,203,000 - 1,203,00D 1,215,000 - 1,215,000 1,203,000 - 1.215,000 - 51 357 Employee Fringe Benefits Other Operating Yes 32,214 54.701 8,635 23.857 82,372 48,000 - 48,000 15,000 - 15,000 48,000 - 15,000 - 52 358 Subscriptions Operating Supplies Yes 348 271 95 67 156 300 - 300 300 300 300 - 300 - 53 360 E-Recording Fees Other Operating Yes 910 620 470 1,160 930 1.000 - 1.000 2,000 - 2.000 1.000 - 2,000 - 54 361 Dues and Memberships Contractual Services Yes 267 557 635 1.800 1,889 2,000 - 2,000 2,000 - 2.000 2,000 - 2,000 - 55 163 Travel Contractual Services Yes - 56 4.041 - - - - - - - - - - - - 56 367 Twining end Awards Operating Supplies Yes 2.592 30.683 44,479 45,283 34,822 60,000 - 60.000 70,000 - 70.000 60,000 - 70,000 - 57 402 Uniform Expense Operating Supplies Yes 38,000 • 38,000 38,000 - 38.000 38,000 - 38.000 • 58 BedDebt Bad Debt Expense Other Operating Yes - - - - - - 156,690 156,690 - 164,280 164,280 156,690 - 164.280 - 59 481 Inventory Purchase MX Stock Operating Supplies Yes - - - - - - - - - - - . . 60 484 Depreciation Depreciation No 2,216.360 1,529,022 1,673240 1.953,487 2,013,049 2.149.000 (2.149.0001 - 2,469,000 12,469,000) - - - - 61 494 Transfer Out-Debt Service Nan-Operating No - - - 1.000 - - - - - - - . - - - 62 540 Amnreiration-Band Issuance Cost and Discount Amortization No 11,268 11.268 11,269 (281,765) (662,119) - - - - - - - - - 63 Total Operating Expenses f 21.420,563 f 18.004357 5 21.078,872 S 21,741.686 S 19.777.323 5 21.568.000 5 (1,514,880) 5 20.053.120 S 22442,500 S (2,298,9211 S 20.343.579 5 20.053.120 5 - 5 20,343,579 S - Internal Charges 64 501 Internal Services-Central Services Internal Charges Yes 5 15.914 0 7.761 5 3,630 5 8,000 5 5.000 S 5.000 5 - S 5.000 5 5,000 S - 0 5,000 5 5,000 5 - 5 5,000 5 - 65 502 Internal Services-Properly Management Internal Charges Yes 40.621 79,917 16.881 64,000 28,000 77,000 - 77.000 77,000 77.000 77.000 - 77400 - 66 503 Internal Services-Flat Management Internal Charges Yes 150,880 186.184 212,877 235,000 287,000 231,000 - 231,000 231,000 - 231.000 231.000 - 231000 - Page 361 of 1707 . 1-24 Tablell City of Miami Beach,Florida Water and Sewer Rate Study Water and Sewer System 1 tility Budect and Allocation of 11141116()pcnttine Evsetnes to Ind)'idnnl SS arena, _.. .. .. -. ill .—',i'. '. --' A11dIP• ...that "XcdlDl° Aeillil...` .lid ' Ad anal 8Ldj{lleil '' iO4, pWae CC/It E4 .Phial Fear Flrsil Year Maud Year F{uJYear ►LW Yaw STeal Yew FtecaIYoor fixed Year FBat Year Meal Year 2029 Fiscal Vmr2021 1k- fbdk dealpttop CMwilieatlan (Yee nr No) 45050, '2016 2011 •1018 20)9 0020 Adjewalmis 2626 ,2021 Ad)r066eMs 2021 • WINo Wastewater Water Weserwater 67 504 Internal Services-Communication Internal Charges Yes 110,000 - - - - - - - - - - - - - - 68 505 Internal Services-Self-Insurance Internal Charges Yes 794,000 829,000 958.000 1,009.000 1,036,000 982.000 - 982.003 982.000 - 982,000 982,000 • 982,000 - 69 506 Intents'Services-Applications/Computer Hardware Internal Charges Yes 140,850 259,000 278,000 284,000 268,000 283.000 - 283,000 283,000 - 283.000 283,000 . 283,000 - 70 508 Property Management-Construction Internal Charges Ya - 7.000 - 376 - - - - - - - - - - 71 511 OIG Funding Internal Charge, Yes - • - - - - - - 16,000 - 16.000 - - 16,000 - 72 512 Internal Services-Elecaial and Maintenance Cameras Internal Charge, Yes 52,769 4,539 - - - - - - • - - - - - 73 513 Internal Services-Automobile Accidence Internal Charges Ye, 2,905 5,000 1,632 - - - - - - - - _ - - 74 Total Internal Charges 5 1,307,939 S 1,371.401 3 1,478.020 3 1,600,000 S 1,624376 S 1,578,000 I - S 1,578,000 S 1.594,000 5 - S 1.594.000 S 1,578.000 5 - S 1394.000 S - Capital Expenditures 75 672 Capitalized Items Fixed Assets Non-Operating No S - S - S 5 • S - S - S - S - S - 5 - 5 - S - S S - S . 76 673 Mote,Vehicle, Non-Operating No 279.131 251,436 47,434 56.432 236.986 495.000 (495,000) - 997,000 (997,000) - - - - - 77 6740M Machinery and Equipment-ORM Other Operating Yes - - - - - - - - - - - - - 78 674 Machinery and Equipment Non-Operating No 25,826 30.033 37.250 - - 191,000 (191,000) - - - - - - • - 79 676 Renovations Non-Operating No - - 154,089 - - - - - - - - 80 680 Meter Services Non-Operating No 91,156 38.934 64,589 (1,152) • 400,000 1400.000) - 400,000 (400.000) - - - - - 81 681 Firelines Non-Operating No 39,042 48.825 14,198 - • 50.000 (50,000) - 25,000 (25.0001 • - - - - 82 682 Hydrants Non-Operating No 24.422 6.589 12.391 26.566 - 25,000 (25,000) - 40,000 (40,000) - - - - • 83 683 Water Mains Non-Operating No 44,951 - 20,658 - 155.233 10.000 110,000) - 10,000 (10.000) - - - - • 84 6870M Pumping Stations-ORM 011ier Operating Ya . - - - - - - - - - - - - - 85 687 Pumping Stations Non-Operating No - - - - - • - - - - - - - - - 86 690 Fixed Assets Module Acquisitions Non-Operating No (504.529) - - - - - - - - - - - - - • 87 999 Transfer to Fund Balance Non-Operating No - - - - - 2,801,000 (2,801,000) - - - - - _ - - 88 Total Capital Expenditures S - S 395,817 S 196,520 S 235,935 5 392.219 S 3.972,000 S (3,972,000) 5 - S 1,472,000 S (1,472,000) 5 - S - S - S - 5 - 89 Total Water System Expenses(425-0410)Experts. S 28212,532 S 24,194.037 5 28,029,861 S 27,189,142 5 26356,553 S 32.089.000 S(5,4E6,880) 5 26,602,120 5 30,490.500 S (3.770,921) 5 26.719579 5 26,602,120 5 - S 26,719,579 5 - Sewer System Expenses(425-0420) Personnel Services 90 III Salaries end Wage, Personal Services Yes 5 1,541,830 5 1.660.608 5 1,831367 5 1,664,299 5 1,662,441 5 1,883,000 5 - 5 1,883,000 S 1,901,000 S - a 1.901.000 S - S 1,883,000 5 - S 1,901,000 91 132 Shift Differential Personal Services Yes 2.526 2,772 2,820 2,551 8,534 3.000 - 3,000 3.000 - 3.000 - 3,000 - 3.000 92 AddPers Additional Personnel Personal Services Yes - - - - - - - - - - - - - 93 133 Steeplejack Personal Services Yen 9,686 11.320 15,615 14,234 6.361 10,000 - 10,000 10,000 10.000 - 10,000 - 10,000 94 135 Overtime Personal Services Yes 92.139 206.443 382,832 221249 214,020 185,000 - 185,000 185,000 - 185,000 - 185,000 - 185,000 95 136 Holiday Pay-Overtime Personal Services Yes 12,786 11.378 16.813 23,142 11,591 15.000 - 15.000 15000 - 15.000 - 15,000 - 15,000 96 139 Work Above Classification Personal Services Yes 4.258 • 4.662 6.200 4,455 6.734 5,000 - 5.000 5,000 - 5.000 - 5,000 - 5.000 97 153 Allowance Personal Services Yes 146,886 169,863 172235 94,943 108,016 109.000 109.000 115,000 - 115.000 - 109,000 - 115.000 98 154 Uniforms Personal Services Yes 14,158 16.767 17.610 15,859 19.950 - - - - - - - - 99 159 Transfers-Pension Obligation Non-Operating No 10,000 11.000 11,000 9.000 9,000 9.000 - 9.000 3.000 - 3.000 - 9,000 - 3,000 100 160 401A Pension Contribution Personal Services Ya - - - - - - - - - - - - • 101 161 Retirement Contributions-Pension Personal Services Ya 503.000 565.000 587,000 522,000 497,000 524.000 - 524,000 557.000 - 557.000 - 524,000 - 557,000 102 162 Health and Life Insurance Personal Services Yes 191.554 202,551 229.810 192303 219.683 258.000 - 258,000 270,000 • 270.000 - 258,000 - 270.000 103 163 Workmen's Compensation Personal Services Yes 33.000 4,000 4.000 3,000 2,000 2,000 . 2000 1,000 - 1.000 - 2.000 - 1,000 104 164 FICA Personal Services Yes 1.162 1.789 10.624 4.299 3.101 3.000 - 3,000 3,000 - 3.000 - 3.000 - 3,000 105 165 Social Security and Medicare Personal Services Yes 24,712 29.338 34,206 28,460 27.921 32400 - 32,000 33,000 - 33.000 - 32,000 - 33.000 106 166 457 Pension Contribution Personal Services Yes - - - - - - • - - - - - - - (07 167 OPEB Contributions Personal Services Yes 1.700 3,825 27.725 11,000 21,000 36.000 - 36,000 41.000 - 41,000 - 36,000 - 41,000 108 168 OPEB PayGo Personal Services Yes 247.000 146.000 153,000 136,000 129,000 150,000 - 150,000 162,000 . 162.000 - 150,000 - 162,000 109 169 GASB 68-Actuarial Expense Personal Services Yes (962216) (324.1111 74.134 (373,329) (50,017) - - - - - - - - - 110 170 GASB 75-OPER Expense Personal Services Ya - - - (147,333) 82.372 - - - - - - - - - - I11 357 Employee Fringe Benefits Personal Smites Yes - - - - 25,171 - • - - - - - 112 Total Personnel Services S 1.874,183 S 2.723205 S 3,576.990 S 2,422,934 S 3.003,878 S 3224,000 S - S 3,224,000 5 3,304,000 S - 5 3,304,000 5 - 5 3,224,000 S - 5 3.304,000 Operating Expenses 13 311 Temporary Labor Contractual Services Ya 5 122,961 S 149_381 5 6,633 5 59,555 S 61799 $ 3,000 S - $ 3,000 S 3,000 5 - S - S - S 3,000 5 - S - 14 312 Professional Services Contractual Services Ya 699.639 32.856 107,069 117,451 579,988 1,149,000 • 1,149,000 399,000 - 399,000 - 1,149,000 - 399,000 15 313 Bank Fees Other Operating Yes - - 153,000 259,748 202,231 260,000 - 260,000 203,000 - 203,000 - 260,000 - 203,000 16 314 Electricity Utilities Yes 434,739 440,412 502,776 431,696 456,313 500.000 - 500,000 484,000 - 484,300 - 500,000 • 484.000 • 17 316 Telephone Utilities Yes 19,163 32,922 20,957 25,332 27,074 27,000 - 27,000 28,000 - 28,030 - 27,000 - 20,000 18 317 Water Utilities Ya 41,836 55,973 27,429 33,325 49.045 - - - - - - - - 19 318 Sewer Charges Utilities Yes 55,143 85.296 33.373 42.351 55,067 48.000 - 48,000 56,000 - 56.000 - 48.000 - 56,000 20 319 Sanitation Fees Utilities Yes - - - - - 7.000 • 7.000 7,000 - 7,000 - 7.000 - 7,000 21 321 Postage and Shipping Contractual Services Yes 52 - 109 79 - 500 • 500 500 - 500 - 500 - 500 22 322 Administration Fees Administrative Fees Yes 1,900,000 2.211.000 2,507.000 1,055,000 1.064,000 1205,000 - 1,205,000 1,205.000 - 1,205,000 - 1.205,000 - 1.205.000 27 3223 Rent-Building and Equipment Contractual Services Yes 37.512 148,219 50.609 25.592 37,498 62.000 - 62.000 62,000 62.000 - 62,000 - 62,000 24 325 Conlan Maintenance Contractual Services Yes 81,667 216.886 686.345 669,806 974,325 947.000 - 947,000 963,000 - 963.000 - 947.000 - 963,000 25 326 Supplies-Other Other Operating Yes - - - - - - - - - - - - - - 26 326 Supplies-Other Operating Supplies Ya 943 9355 14,944 16,018 127.619 - - - - - - - - - - 27 327 Advertising Coetraclual Services Yes - 249 - - 250 500 - 500 500 - 500 - 500 500 28 329 Storm Water Utilities Y. 5.202 1.400 8.275 1,957 2,026 - 2,000 - 2,000 - - - 2.000 29 331 Supplies-Information Technology Other Operating Yes 2.066 117 1.892 830 - - - - - - - . - - 30 337 Sewer Treatment Contractual Services Yes 20.865333 25.954.307 25.971.150 23,656,233 2027.210 24.020.000 (484,460) 23535.540 24,795.000 18.689) 24.786.311 - 23,535,540 - 24,786.311 Page 362 of 1707 . Tablet-6 City of Miami Beach,Florida Water and Sewer Rate Study Water and Sewer System (itilily Budge(and Allocation of Utility Operating Expenses to Ind ivid nal Systems -. ., - _ ate.... .� 4 1lei41ti{ Arlin: 'Adirl /otos ' `Acus) 'CeRul teetiaM ' ' udotod laded dt'SaBtase ' CAFR Expeesai khoel year FMB Year .riser,)Year Fiscal Year Meal Year Flying Year neat Year Fiscal Yeae Fbeal Year Shoal Tem 2020 Fiscal Year 2021 fid, - roil Slnotfptlnes C'IaselOeadore ,Yes or No) WO 1816 2817 2018 2019 381e Ad(setmwib 2628 2021 Adpulmenb 2021 Water Wateaaetr We1r Weslewater 131 337Th W ASD Trve-Up-Wastewater Contractual Services Ya - - - - - - - - - - - 132 341 Supplies-Office Operating Supplies Yes - 16 1.118 11,201 3,641 7.000 - 7.000 7,000 - 7.000 - •7.000 - 7,000 133 342RM Repairs/Maintenance Supply Operating Supplies Yes - - - - - - - - - - 134 342 Contracted Services-Repair and Maintenance Contractual Services Yes 359,014 (52.1581 590.972 515,124 139.565 37,000 - 137.000 142.000 - 142.000 - 137,000 - 142.000 135 343 Other Operating Expenditures Other Operating Yes 374.940 996.260 1348.002 1,541,889 428,595 1509.000 - 1,509,000 1.512.000 - 1,512.000 - 1,509,000 - 1512.000 136 349 Other Contractual Services(DERM) Contreclual Services Yes 2.557.063 3.356.893 3,453,937 3,863.069 2.847,919 2.893.000 - 2.893.000 2.693,000 200,000 2.893,000 - 2,893.000 - 2,893.000 137 350 Capital Repairs and Maintenance Other Operating Yes 138 351' Engine Fuel and Lubricants Operating Supplies Ya (1.080) 8,622 21,629 - 493 7,000 - 7,000 17,000 - 17.000 - 7,000 - 17,000 139 356 Contingencies Contingency Ya - - - - - 2.009.000 - 2,009,000 1,821,000 - 1,821,000 - 2,009,000 - 1,821,000 140 357 Employee Fringe Benefits Other Operating Yes 34,470 37.696 51.480 14,617 25.171 10,000 - 10,000 - - - - 10,000 - 141 358 Subscriptions Operating Supplies Ya - - - - - - - - - _ _ - - 142 361- Dues and Memberships Contractual Services Yes 120 75 167 490 705 1.000 - 1,000 1.000 - 1.000 - 1.000 - 1.000 143 363 Travel Contractual Services Yes 420 8.101 2.375 - - - - - • 144 367 Training end Awards Operating Supplies Yes 2.474 21.783 27,881 27,394 50,835 63.000 - 63,000 73.000 - 73.000 - 63,000 - 73.000 145 368 Taxes end Licenses Operating Supplies Yes - - - - - - - - _ " 146 402 Uniform F-spcnse Operating Supplies Yes - - - - - 26.000 - 26.000 26,000 - 26.000 - 26.000 - 26.000 147 Badlebt Bad Debt Expense Other Operating Yes - - - - - 232,537 232,537 - 240.560 240,560 - 232.537 - 240.560 148 481 Inventory Purchase MX Stock Operating Supplies Ya - - - - - - - _ - _ " 149 484 Depreciation Depreciation Yes 2.559.923 3,181.997 3.338,188 3.661,676 3.740.835 4,028.000 (4,028.000) - 1,601.500 (1,601.500) - - - • - 130 54D Amortization•Bond Issuance Cost and Discount Amonimtion Yes - - - - - - - - - - • 151 491 Transfers Out Non-Operating Ya - - - - - - - _ •- - _ - 152 999 Transfer to Fund Balance Non-Operating Yes - - - - - 1,267,000 (1,267.0001 - - - - - - 153 Total Operating Expenses S 30.173.620 S 36.898,057 S 38.927.309 $36.030.434 S 35,502.401 S 40.186.000 S 15.546.923) 5 34.639,077 0 36.101.500 5 (1.169,629) S 34,928,871 5 - 5 34,639,077 S - S 34,928,871 Internal Charges 154 501 eternal Servias-Central Services Internal Charges Yes S 13,654 S 6,112 S 2,073 5 6,000 S 2.009 S 2,000 5 - S 2,000 5 2,000 S - S 2.000 S - 5 2,000 S - S 2.000 155 502 eternal Services-Peopeny Management Internal Charges Yes 80,556 129,112 20,998 9.000 . 62,000 99.000 - 99.000 99,000 - 99,000 - 99,000 - 99.000 156 503 ntemal Services-Fleet Management Internal Charges Ya 267.536 276.604 262,956 333.000 408,000 368.000 _ 368,005 368,000 - 368,000 - 368,000 - 368.000 157 504 eternal Services-Communication Internal Charges Yes 45.000 - - - - - - - _ (58 505 eternal Services-Self-Insurance Intemel CharYa 932.000 973.000 1.129,000 1,174,000 1,206.000 986,000eternalges 986,000 986,000 - 986,000 - 986,000 - 986.000 159 506 ntemel Services-Applications/Computer Hardware Internal Charges Yes 53.000 102,000 108.000 108,000 148,000 189,000 _ 189,000 189,000 - 189,000 - 189,000 - 189,000 160 506 Properly Management-Construction Internal Charges Yes - - - - - - _ _ • 161 511 OIG Funding Peened Charges Yea - - - - - - - - 12,000 - 12,000 - - - 12.000 162 3)2 InteralServices-Electrical and Meinlenarce Contracts Internal Charges Yea 52.769 4,539 7,000 - 354 - - - - - - 163 513 Internal Services-Automobile Accidents Internal Charges Yes 3,167 3,321 11,634 _ - - - _ _ - - _ 164 Total Internal Charges 5 1.447.681 5 1,494,688 S 1,536,161 5 1,630.000 5 1,826.354 S 1.644,000 5 • 5 1,644,000 5 1,656,000 0 - S 1.656,000 5 - 0 1,644,000 S - S 1,656,000 • Capital Outlay 165 672 Capitalised Items Fined Assets Non-Operating No 5 - 5 - S - 5 - 5 - $ - 5 - S - S - 5 - S - S - 5 - S - 5 - 166 673 Motor Vehicles Non-Operating Na 34,834 1.153.908 70.153 633,044 68,073 236,000 (236.000) . 354,500 (554,500) - - - - - 167 6740M Machinery and Equipment-O&M Other Operating Ya - - - - - - - - - - ' • 168 674 Machinery and Equipment Non-Operating No 223.908 298,104 354.649 80,777 8,695 153.000 (133.000) - 639.500 (639.5001 - - - 169 676 Renovations Non-Operating No - - - - - - - - - - - - - - 170 680 Meter Services Non-Operating No - - - - - - - - - - - - - - 171 684 Sewer Lines Non-Operating No 1.469 1,057 2,749 - - . - - - - - - - 172 685 Sewer Laterals Non-Operating No 11.765 24.333 23,675 13.759 453.464 25.000 125.0003 - 24.000 (24,000) - - - - 17.3 686 Force Mains Non-Operating No - - - - - - - - - - - - 174 687 Pumping Stations Non-Operating No - - - - - - - - - - - - - - 175 690 Fixed Assess Module Acquisitions Non-Operating No (271976) - - - - - - - - - - - - 176 Total Capital Outlay S - S 1,477.403 S 455.227 S 727,580 3 530,252 S 414.000 S (41000) S - 5 1,218,000 5 (1.218.000) S • S - 5 - S _ S - 177 Total Sewer Syslem Expenses(4250920)Expenses S 33,495.484 S 42.593353 5 44.495,686 5 40,810,948 S 40.662,886 5 45.468.000 S (5,960,923) S 39,507,077 5 42,279,500 5 (2.387.629) $39,888.871 5 - 5 39,507,077 S - S 39,888,871 178 Total Water end Sewer Fund Operating Expenditures 5 61,708,015 5 67,167,389 5 72,525,548 5 68,000,090 S 67,118,939 ...300 S(11.447,803)2.26 )92.7.. 5 72,770,000 5(6,158,550) S 66,608,450 5 26,602,120 5 39,507,077 5 26,7(9,579 .U.9 .../1 179 Actual Operating Expenses 5 59,453,387 0 64,046.978 5 70,162,291 S 65,342,853 5 64,924,538 5 71,000,000 5 (4,912,803) S 66,087,197 5 67,604.000 5 66,601,450 .L26,569,)20 5 39,498,077 1.2111.L_.,579 S 39,885,871 Page 363 of 1707 1.20 • Tablelfi City of Miami Beach,Florida Water and Sewer Rate Study Water and Sewer System Utility Budget and Alhmalion of Utility Operatine Eaoenacc to India Wool Stxtems _f,., 14..;",. .,: r y,_�..,.._s¢., _. , "2'(`tl$aadtig •..: RrYli ..... AllnB[,x•F„?,•,;•,Aet4s1 Avia"r ,XY,IiNI'.� d�.; Ad d'ala1 "{$i........ Ad/oWH. ;.; .. ,.,- A)t rafl90 Amounb '^'C4ydse, ,' erint $ofram7 '4tttl7Yi,ee Fa411 Y•&t. ,Fbeal Year Meal Year P7r'ral Year Flaartyoar Meal Veer FieruJY'ear ., Flmctt Year ..t>BeatYea r 2020 Haul Year 2021 •d.' CO3r Iies7lyaMnCWadRcedon (Yee er t961 ^3118 3816 2017 2078 2010 2020 AdJOatroanm 3041 2051 . AdiaidaMnb 2021 Wethe • Waaewakr Wailer Wastewater CAFR Formal: 80 Personal Services 57331.213 57.818,466 58,826,439 56,013.455 57.545.013 58.173,000 58,079.000 81 Operating Supplies 21.270 80,955 128.674 137.709 298,245 208.300 218.300 82 Conlractuai Services 41.838.494 44,028.228 46116294 47.431.029 45,761,879 44,668,670 45_568.310 83 Utililiea 854.193 943.443 996804 976375 1,044.557 956000 958,000 ' 84 Insofar. 00 0 0 0 85 Internal Charges 2,755,620 2,866,089 3,014,181 3,230,000 3.450,731 3.222.000 3.250.000 86 Depreciation 4.776.284 4,711,020 5.011428 5,615,163 5.753.884 0 0 87 Administrative Fees 3.379.000 3,740.004 3,986000 1,809.000 1,766,000 2,406000 2,400.000 88 Amoniration 11.268 11,268 11,269 (281,765) (662,1191 0 0 89 Claims end Judgments 0 0 0 0 0 0 0 90 Other Operating 713.674 1.387.696 1.766,712 2,083,609 1715.278 3,247,227 3.071.840 91 Contingency 0 0 0 0 0 3.212,000 3,036,000 92 Total Curren)Expenses 561.681.015 565387.169 571,846,801 567,014.575 566,276467 566.087.197 566,601,450 93 less Administrative Fees,Depreciation,and Amortization (8,166.552) 18.462.292) 19.002.6971 (7,142.398) (6.859,7651 (2.400.0001 (2,400.0001 94 Current Expenses for Debt Service Coverage Purposes 553,514,463 557,124,877 562,844,104 559.872,177 559,415,703 563,687,197 564.201,450 Page 364 of 1707 1.37 Table 1-7 City of Miami Beach,Florida Water and Sewer Rate Study Water System Projected Operating Expenses-Water System coin-it Fee l , . . . teal ear Eadla Se teacher ' . Ad., Cad* IyeseMpHnn Relereaee . 2830' 2021 2022 ' .2023 2014 2025 2026, 2027 2028 2029 2030 Water System Expenses(425-0410) Personnel Services I 11l Salaries and Wages Labor $ 2,864,000 $ 2,844,000 $ 2,929,320 $ 3,017,200 $ 3,107.716 $ 3,200,947 $ 3,296,975 $ 3,395,885 $ 3,497,761 $ 3,602,694 S 3,710,775 2 132 ' Shift Differential Labor 3,000 3,000 3,090 3,183 3,278 3,377 3,478 3,582 3,690 3,800 3,914 3 AddPers Additional Personnel Input - - - - - - - - - - - 4 135 Overtime Labor 181,000 20,000 20,600 21,218 21,855 22,510 23,185 23,881 24,597 25,335 26,095 5 136 Holiday Pay-Overtime Labor 12,000 12,000 12,360 12,731 13,113 13,506 13,911 14,329 14,758 15,201 15,657 6 139 Work Above Classification Labor 3,000 3.000 3,090 3,183 3,278 3,377 3,478 3,582 3,690 3,800 3,914 7 153 Allowances Labor 142,000 145,000 149,350 153,831 158,445 163,199 168,095 173,138 178,332 183,682 189,192 8 159 Transfers-Pension Obligation Labor 13,000 4,000 4,120 4,244 4,371 4,502 4,637 4,776 4,919 5,067 5,219 9 160 401A Pension Contribution Labor 13,000 13,000 13,390 13.792 14,205 14,632 15,071 15,523 15,988 16,468 16,962 10 161 Retirement Contributions-Pension Labor 820,000 833,000 857,990 883,730 910,242 937,549 965,675 994,646 1,024,485 1,055,219 1.086,876 11 162 Health and Life Insurance Healthlns 496.000 487,000 511,350 536,918 563,763 591,952 621,549 652,627 685,258 719,521 755,497 12 163 Workmen's Compensation Labor 3,000 1,000 1,030 1,061 1.093 1,126 1,159 1,194 1,230 1,267 1,305 13 164 FICA Labor 5,000 5,000 5,150 5.305 5.464 5,628 5,796 5,970 6,149 6,334 6,524 14 165 Social Security and Medicare Labor 47,000 47,000 48,410 49,862 51,358 52,899 54,486 56,120 57,804 59,538 61,324 15 167 OPEB Contributions Labor 70,000 74,000 76,220 78,507 80,862 83,288 85,786 88,360 91,011 93,741 96,553 16 168 OPEB PayGo Labor 299,000 291,000 299,730 308,722 317,984 327,523 337,349 347,469 357,893 368,630 379,689 17 Total Personnel Services $ 4,971,000 $ 4,782,000 $ 4,935,200 $ 5,093,483 $ 5,257,026 $ 5,426,012 $ 5,600,631 $ 5,781,081 $ 5,967,566 $ 6,160,298 $ 6,359,498 Operating Expenses 18 311 Temporary Labor Labor $ 3,000 S 9,000 $ 9,270 $ 9,548 $ 9,835 S 10,130 $ 10,433 $ 10,746 $ 11,069 $ 11,401 $ 11,743 19 312 Professional Services Labor 1,210,000 460,000 473,800 488,014 502,654 517,734 533,266 549,264 565,742 582.714 600,196 20 313 Bank Fees WRevenue 190,000 I11,000 120,804 130,144 134,699 139,413 140,576 141,721 142,901 144,119 144,119 21 314 Electricity ElectricW 320,000 347,000 377,085 409,021 425,382 442,397 460,093 478,497 497,637 517,542 538,244 22 316 Telephone Inflation 33,000 33,000 33,858 34,704 35,537 36,355 37,191 38.046 38,883 39,739 40,613 23 317 Water Inflation 19,000 1,000 1,026 1,052 1,077 1,102 1,127 1,153 1,178 1,204 1,231 24 319 Sanitation Fees Inflation 2,000 - - - - - - - - - - 25 321 Postage and Shipping Inflation 200 200 205 210 215 220 225 231 236 241 246 26 322 Administration Fees Labor 1,195,000 1.195,000 1,230,850 1,267,776 1,305,809 1,344,983 1,385,333 1,426,892 1,469,699 1,513,790 1,559,204 27 323 Rent-Building and Equipment Inflation 7,000 4,000 4,104 4,207 4.308 4,407 4,508 4,612 4,713 4,817 4,923 28 324 Printing-External Inflation 31,000 27.000 27,702 28,395 29,076 29,745 30,429 31,129 31,814 32,513 33,229 29 325 Contract Maintenance Repair 492,000 492,000 511,680 532,147 553,433 575,570 598.593 622,537 647,438 673,336 700,269 30 327 Advertising Inflation 500 1,000 1,026 1,052 1,077 1,102 1,127 1.153 1,178 1,204 1,231 3I 331 Supplies-Information Technology Inflation 4,000 4.000 4,104 4,207 4,308 4,407 4,508 4,612 4,713 4,817 4,923 32 336 Water for Resale ' Calculated 12,314,156 13,354,434 13,954,098 14,553,763 14,553,763 14,553,763 14,553,763 14,553,763 14,553,763 14,553,763 14,553,763 33 341 Supplies-Office Inflation 7,000 7,000 7,182 7,362 7,538 7,712 7,889 8,070 8,248 8,429 8,615 34 343 Other Operating Expenditures Inflation 832,000 800,000 820,800 841,320 861,512 881,326 901,597 922,334 942,625 963,363 984,557 35 349 Other Contractual Services(DERM) Calculated 1,880,274 1,971,365 2,145,478 2,311,359 2,392,257 2,475,987 2,496,189 2,516,997 2,537,511 2,558,643 2,580,435 36 351 Engine Fuel and Lubricants Fuel 4,000 20,000 21,000 22,050 23,153 24,310 25,526 26,802 28,142 29,549 31,027 37 356 Contingencies Constant 1,203,000 1,215,000 1,215,000 1,215,000 1,215,000 1,215,000 1,215,000 1,215,000 1,215,000 1,215,000 1,215,000 38 357 Employee Fringe Benefits Labor 48,000 15,000 15,450 15,914 16,391 16,883 17,389 17,911 18,448 19,002 19,572 39 358 Subscriptions Inflation 300 300 308 315 323 330 338 346 353 361 369 40 360 E-Recording Fees Inflation 1,000 2,000 2,052 2,103 2,154 2,203 2,254 2,306 2,357 2,408 2,461 41 361 Dues and Memberships Inflation 2,000 2,000 2,052 2,103 2,154 2,203 2,254 2,306 2,357 2,408 2,461 42 367 Training and Awards Inflation 60,000 70,000 71,820 73,616 75,382 77,116 78,890 80,704 82,480 84,294 86,149 43 402 Uniform Expense Inflation 38,000 38,000 38,988 39,963 40,922 41,863 42,826 43,811 44,775 45,760 46,766 44 BadDebt Bad Debt Expense WRevenue 156,690 164,280 178,790 192,613 199,355 206,332 208,052 209,748 211,495 213,296 213,296 45 Total Operating Expenses $20,053,120 $20,343,579 $21,268,531 $22,187,957 $22.397,313 $22,612,594 $22,759,376 $22,910,691 $23,064,755 $23,223,715 $23,384,641 Page 365 of 1707 .4 1-28 Table 1-7 City of Miami Beach,Florida Water and Sewer Rate Study Water System Protected Operatine Expenses-Water System . . Fiscal Year Bodin•Se. mber 30 . `�Y�iAosu° Code Deserlptkm Iteilereaee 2021 2022 2023 2024 2025 2026 2021 2028 2029 2030 Internal Charges 46 501 Internal Services-Central Services Labor $ 5,000 $ 5,000 $ 5,150 $ 5,305 $ 5,464 $ 5,628 $ 5,796 $ 5,970 $ 6,149 $ 6,334 $ 6,524 47 502 Internal Services-Property Management Labor 77,000 77,000 79,310 81,689 84,140 86,664 89,264 91,942 94,700 97,541 100,468 48 503 Internal Services-Fleet Management Labor 231,000 231,000 237,930 245,068 252,420 259,993 267,792 275,826 284,101 292,624 301,403 49 505 Internal Services-Self-Insurance Labor 982,000 982,000 1,011,460 1,041,804 1,073,058 1,105,250 1,138,407 1,172,559 1,207,736 1,243,968 1,281,287 50 506 Internal Services-Applications I Computer Hardware Labor 283,000 283,000 291,490 300,235 309,242 318,519 328,075 337,917 348,054 358,496 369,251 51 511 OIG Funding Labor - 16,000 16,480 16,974 17,484 18,008 18,548 19,105 19,678 20,268 20,876 52 Total Internal Charges $ 1,578,000 $ 1,594,000 $ 1,641,820 $ 1,691,075 $ 1,741,807 $ 1,794,061 $ 1,847,883 $ 1,903,319 $ 1,960,419 $ 2,019,232 $ 2,079,808 53 TOTAL WATER SYSTEM OPERATING EXPENSES $26,602,120 $26,719,579 $27,845,551 $28,972,514 $29,396,145 $29,832,667 $30,207,890 $30,595,091 $30,992,741 $31,403,244 $31,823,947 • Page 366 of 1707 • 1-29 Table 1-8 City of Miami Beach,Florida Water and Sewer Rate Study Sewer System Projected Operating Expenses-Sewer System y• ' g8'=t'�4�%. ;tS '-:" V`..>';'''''''..."'-.[4'.ns -. +A -:' n�Al6Mr.,"y �q-kkx Q " . k:E, x N ,� Mk4.. § 3VIXij�$ fLttlrl Secu'tiYJt -4-::,-Y,'":"",,:*.. Y,- - _ t:9;t. ., bsetliio6., ,.• :1" t,...i::1:::•'...',`. r:Atela r(ce; .,_.:fi-.103t1,:1„ , '4011¢t ri.262Z, 023 :"I'-'11'-';':20.4t r 4'" :2025,,, ' 2026r. r.' 2027' ",,i10/1P.t-'., 2029 2930 -r Sewer System Expenses(425-0420) Personnel Services I 111 Salaries and Wages Labor $ 1,883,000 $ 1,901,000 $ 1,958,030 $ 2,016,771 $ 2,077,274 $ 2,139,592 $ 2,203,780 $ 2,269,893 $ 2,337,990 $ 2,408,130 $ 2,480,374 2 132 Shift Differential Labor 3,000 3,000 3,090 3,183 3,278 3,377 3,478 3,582 3,690 3,800 3,914 3 AddPers Additional Personnel Input - - - - - - - - - - - 4 133 Steeplejack Labor 10,000 10,000 10,300 10,609 10,927 11,255 11,593 11,941 12,299 12,668 13,048 5 135 Overtime Labor 185,000 185,000 190,550 196,267 202,154 208,219 214,466 220,900 227,527 234,352 241,383 6 136 Holiday Pay-Overtime Labor 15,000 15,000 15,450 15,914 16,391 16,883 17,389 17,911 18,448 19,002 19,572 7 139 Work Above Classification Labor 5,000 5,000 5,150 5,305 5,464 5,628 5,796 5,970 6,149 6,334 6,524 8 153 Allowances Labor 109,000 115,000 118,450 122,004 125,664 129,434 133,317 137,316 141,435 145,679 150,049 9 159 Transfers-Pension Obligation Labor 9,000 3,000 3,090 3,183 3,278 3,377 3,478 3,582 3,690 3,800 3,914 10 161 Retirement Contributions-Pension Labor 524,000 557,000 573,710 590,921 608,649 626,908 645,716 665,087 685,040 705,591 726,759 11 162 Health and Life Insurance Healthlns 258,000 270,000 283,500 297,675 312,559 328,187 344,596 361,826 379,917 398,913 418,859 12 163 Workmen's Compensation Labor 2,000 1,000 1,030 1,061 1,093 1,126 1,159 1,194 1,230 1,267 1,305 13 164 FICA Labor 3,000 3,000 3,090 3,183 3,278 3,377 3,478 3,582 3,690 3,800 3,914 14 165 Social Security and Medicare Labor 32,000 33,000 33,990 35,010 36,060 37,142 38,256 39,404 40,586 41,803 43,058 166 457 Pension Contribution Labor - - - - - - - - - - - 15 167 OPEB Contributions Labor 36,000 41,000 42,230 43,497 44,802 46,146 47,530 48,956 50,425 51,938 53,496 16 168 OPEB PayGo Labor 150,000 162,000 166,860 171,866 177,022 182,332 187,802 193,436 199,240 205,217 211,373 17 Total Personnel Services $ 3,224,000 $ 3,304,000 $ 3,408,520 $ 3,516,446 $ 3,627,892 $ 3,742,980 $ 3,861,834 $ 3,984,580 $ 4,111,354 $ 4,242,293 $ 4,377,540 Operating Expenses 18 311 Temporary Labor Labor $ 3,000 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 19 312 Professional Services Labor 1,149,000 399,000 410,970 423,299 435,998 449,078 462,550 476,427 490,720 505,441 520,605 20 313 Bank Fees SRevenue 260,000 203,000 214,828 226,133 229,525 232,968 234,910 236,825 238,797 240,831 240,831 21 314 Electricity ElectricS 500,000 484,000 503,360 523,494 544,434 566,212 588,860 612,414 636,911 662,387 688,883 22 316 Telephone Inflation 27,000 28,000 28,728 29,446 30,153 30,846 31,556 32,282 32,992 33,718 34,459 23 318 Sewer Charges Inflation 48,000 56,000 57,456 58,892 60,306 61,693 63,112 64,563 65,984 67,435 68,919 24 319 Sanitation Fees Inflation 7,000 7,000 7,182 7,362 7,538 7,712 7,889 8,070 8,248 8,429 8,615 25 321 Postage and Shipping Inflation 500 500 513 526 538 551 563 576 589 602 615 26 322 Administration Fees Labor 1,205,000 1,205,000 1,241,150 1,278,385 1,316,736 1,356,238 1,396,925 1,438,833 1,481,998 1,526,458 1,572,252 27 323 Rent-Building and Equipment Inflation 62,000 62,000 63,612 65,202 66,767 68,303 69,874 71,481 73,053 74,661 76,303 28 325 Contract Maintenance Repair 947,000 963,000 1,001,520 1,041,581 1,083,244 1,126,574 1,171,637 1,218,502 1,267,242 1,317,932 1,370,649 29 327 Advertising Inflation 500 500 513 526 538 551 563 576 589 602 615 30 329 Storm Water Inflation - 2,000 2,052 2,103 2,154 2,203 2,254 2,306 2,357 2,408 2,461 31 337 Sewer Treatment Calculated 23,535,540 24,786,311 25,677,285 26,568,259 26,568,259 26,568,259 26,568,259 26,568,259 26,568,259 26,568,259 26,568,259 32 341 Supplies-Office Inflation 7,000 7,000 7,182 7,362 7,538 7,712 7,889 8,070 8,248 8,429 8,615 33 342 Contracted Services-Repair and Maintenance Repair 137,000 142,000 147,680 153,587 159,731 166,120 172,765 179,675 186,862 194,337 202,110 34 343 Other Operating Expenditures Inflation 1,509,000 1,512,000 1,551,312 1,590,095 1,628,257 1,665,707 1,704,018 1,743,211 1,781,561 1,820,756 1,860,812 35 349 Other Contractual Services(BERM) Calculated 2,893,000 2,893,000 3,054,908 3,215,673 3,263,913 3,312,873 3,339,897 3,367,737 3,395,181 3,423,465 3,452,619 36 350 Capital Repairs and Maintenance Repair - - - - - - - - - - - 37 351 Engine Fuel and Lubricants Fuel 7,000 17,000 17,850 18,743 19,680 20,664 21,697 22,782 23,921 25,117 26,373 38 356 Contingencies Constant 2,009,000 1,821,000 1,821,000 1,821,000 1,821,000 1,821,000 1,821,000 1,821,000 1,821,000 1,821,000 1,821,000 39 357 Employee Fringe Benefits Labor 10,000 - - - - - - - - - - 40 361 Dues and Memberships Inflation 1,000 1,000 1,026 1,052 1,077 1,102 1,127 1,153 1,178 1,204 1,231 41 367 Training and Awards Inflation 63,000 73,000 74,898 76,770 78,613 80,421 82,271 84,163 86,015 87,907 89,841 42 402 Uniform Expense Inflation 26,000 26,000 26,676 27,343 27,999 28,643 29,302 29,976 30,635 31,309 31,998 43 BadDebt Bad Debt Expense SRevenue 232,537 240,560 254,576 267,973 271,993 276,073 278,374 280,643 282,980 285,390 285,390 44 Total Operating Expenses $34,639,077 $34,928,871 $36,166,276 $37,404,805 $37,625,992 $37,851,501 $38,057,292 $38,269,524 $38,485,321 $38,708,079 $38,933,456 Page 367 of 1707 1-30 Table 1-8 City of Miami Beach,Florida Water and Sewer Rate Study Sewer System Projected Operating Expenses-Sewer System at" Lipeaeelsealotioh Fiscal Year End( :Se.tember 30 :talo:• .Code Description Reference 2020 2021 2022 2023 2024 2025 2026 2827 2028 2029 2030 Internal Charges 45 501 Internal Services-Central Services Labor $ 2,000 $ 2,000 $ 2,060 $ 2,122 $ 2,185 $ 2,251 $ 2,319 $ 2,388 $ 2,460 $ 2,534 $ 2,610 46 502 Internal Services-Property Management Labor 99,000 99,000 101,970 105,029 108,180 111,425 114,768' 118,211 121,758 125,410 129,173 47 503 Internal Services-Fleet Management Labor 368,000 368,000 379,040 390,411 402,124 414,187 426,613 439,411 452,594 466,171 480,157 48 504 Internal Services-Communication Labor - - - - - - - - - - - 49 505 Internal Services-Self-Insurance Labor 986,000 986,000 1,015,580 1,046,047 1,077,429 1,109,752 1,143,044 1,177,336 1,212,656 1,249,035 1,286,506 50 506 Internal Services-Applications/Computer Hardware Labor 189,000 189,000 194,670 200,510 206,525 212,721 219,103 225,676 232,446 239,420 246,602 51 511 OIG Funding Labor - 12,000 12,360 12,731 13,113 13,506 13,911 14,329 14,758 15,201 15,657 52 Total Internal Charges $ 1,644,000 $ 1,656,000 $ 1,705,680 $ 1,756,850 $ 1,809,556 $ 1,863,843 $ 1,919,758 $ 1,977,351 $ 2,036,671 $ 2,097,771 $ 2,160,704 53 Total Sewer System Expenses(425-0420)Expenses $39,507,077 $39,888,871 $41,280,476 $42,678,101 $43,063,440 $43,458,324 $43,838,884 $44,231,455 $44,633,347 $45,048,143 $45,471,701 54 TOTAL SEWER SYSTEM OPERATING EXPENSES $39,507,077 $39,888,871 $41,280,476 $42,678,101 $43,063,440 $43,458,324 $43,838,884 $44,231,455 $44,633,347 $45,048,143 $45,471,701 • Page 368 of 1707 1-31 Table 1-9 City of Miami Beach,Florida Water and Sewer Rate Study Combined System Projected Combined Water and Sewer Oneratinn Expenses • s -.:---,%. .u.., , - , �i�lt$"�"x �`` r'.":z - .::,* �',;� ., �I✓��'Zf ,* a�r� '',"-:-,,,,,^1:;.: r.r �o-{z �. � FiYr�lYcarl;�irjln "ii, s� .yn..4 4 6t b i'ipi[mi ' • .,q',.' .-' . : ., CPis11f1¢ritinx a 2020;"i'", 202'1, - 2022 2023 .- N4 :2024 '2025 2026 '2027 2028• '-2029 2030 Water System Expenses(425-0410) Personnel Services 1 111 Salaries and Wages Personal Services $ 2,864,000 $ 2,844,000 $ 2,929,320 $ 3,017,200 $ 3,107,716 $ 3,200,947 $ 3,296,975 $ 3,395,885 $ 3,497,761 $ 3,602,694 $ 3,710,775 2 132 Shift Differential Personal Services 3,000 3,000 3,090 3,183 3,278 3,377 3,478 3,582 3,690 3,800 3,914 3 AddPers Additional Personnel Personal Services - - - - - - - - - - - 4 135 Overtime Personal Services 181,000 20,000 20,600 21,218 21,855 22,510 23,185 23,881 24,597 25,335 26,095 5 136 Holiday Pay-Overtime Personal Services 12,000 12,000 12,360 12,731 13,113 13,506 13,911 14,329 14,758 15,201 15,657 6 139 Work Above Classification Personal Services 3,000 3,000 3,090 3,183 3,278 3,377 3,478 3,582 3,690 3,800 3,914 7 153 Allowances Personal Services 142,000 145,000 149,350 153,831 158,445 163,199 168,095 173,138 178,332 183,682 189,192 8 159 Transfers-Pension Obligation Non-Operating 13,000 4,000 4,120 4,244 4,371 4,502 4,637 4,776 4,919 5,067 5,219 9 160 40IA Pension Contribution Personal Services 13,000 13,000 13,390 13,792 14,205 14,632 15,071 15,523 15,988 16,468 16,962 10 161 Retirement Contributions-Pension Personal Services 820,000 833,000 857,990 883,730 910,242 937,549 965,675 994,646 1,024,485 1,055,219 1,086,876 1 I 162 Health and Life Insurance Personal Services 496,000 487,000 511,350 536,918 563,763 591,952 621,549 652,627 685,258 719,521 755,497 12 163 Workmen's Compensation Personal Services 3,000 1,000 1,030 1,061 1,093 1,126 1,159 1,194 1,230 1,267 1,305 13 164 FICA Personal Services 5,000 5,000 5,150 5,305 5,464 5,628 5,796 5,970 6,149 6,334 6,524 14 165 Social Security and Medicare Personal Services 47,000 47,000 48,410 49,862 51,358 52,899 54,486 56,120 57,804 59,538 61,324 15 167 OPER Contributions Personal Services 70,000 74,000 76,220 78,507 80,862 83,288 85,786 88,360 91,011 93,741 96,553 16 168 OPEB PayGo Personal Services 299,000 291,000 299,730 308,722 317,984 327,523 337,349 347,469 357,893 368,630 379,689 17 Total Personnel Services $ 4,971,000 $ 4,782,000 $ 4,935,200 $ 5,093,483 $ 5,257,026 5 5,426,012 5 5,600,631 5 5,781,081 $ 5,967,566 $ 6,160,298 S 6,359,498 Operating Expenses 18 311 Temporary Labor Contractual Services $ 3,000 $ 9,000 $ 9,270 $ 9,548 $ 9,835 $ 10,130 $ 10,433 $ 10,746 $ 11,069 $ 11,401 $ 11,743 19 312 Professional Services Contractual Services 1,210,000 460,000 473,800 488,014 502,654 517,734 533,266 549,264 565,742 582,714 600,196 20 313 Bank Fees Other Operating 190,000 111,000 120,804 130,144 134,699 139,413 140,576 141,721 142,901 144,119 144,119 21 314 Electricity Utilities 320,000 347,000 377,085 409,021 425,382 442,397 460,093 478,497 497,637 517,542 538,244 22 316 Telephone Utilities 33,000 33,000 33,858 34,704 35,537 36,355 37,191 38,046 38,883 39,739 40,613 23 317 Water Utilities 19,000 1,000 1,026 1,052 1,077 1,102 1,127 1,153 1,178 1,204 1,231 24 319 Sanitation Fees Utilities 2,000 - - - - - - - - - - 25 321 Postage and Shipping Contractual Services 200 200 205 210 215 220 225 231 236 241 246 26 322 Administration Fees Administrative Fees 1,195,000 1,195,000 1,230,850 1,267,776 1,305,809 1,344,983 1,385,333 1,426,892 1,469,699 1,513,790 1,559,204 27 323 Rent-Building and Equipment Contractual Services 7,000 4,000 4,104 4,207 4,308 4,407 4,508 4,612 4,713 4,817 4,923 28 324 Printing-External Contractual Services 31,000 27,000 27,702 28,395 29,076 29,745 30,429 31,129 31,814 32,513 33,229 29 325 Contract Maintenance Contractual Services 492,000 492,000 511,680 532,147 553,433 575,570 598,593 622,537 647,438 673,336 700,269 30 327 Advertising Contractual Services 500 1,000 1,026 1,052 1,077 1,102 1,127 1,153 1,178 1,204 1,231 31 331 Supplies-Information Technology Other Operating 4,000 4,000 4,104 4,207 4,308 4,407 4,508 4,612 4,713 4,817 4,923 32 336 Water for Resale Contractual Services 12,314,156 13,354,434 13,954,098 14,553,763 14,553,763 14,553,763 14,553,763 14,553,763 14,553,763 14,553,763 14,553,763 33 341 Supplies-Office Operating Supplies 7,000 7,000 7,182 7,362 7,538 7,712 7,889 8,070 8,248 8,429 8,615 34 343 Other Operating Expenditures Other Operating 832,000 800,000 820,800 841,320 861,512 881,326 901,597 922,334 942,625 963,363 984,557 35 349 Other Contractual Services(DERM) Contractual Services 1,880,274 1,971,365 2,145,478 2,311,359 2,392,257 2,475,987 2,496,189 2,516,997 2,537,511 2,558,643 2,580,435 36 351 Engine Fuel and Lubricants Other Operating 4,000 20,000 21,000 22,050 23,153 24,310 25,526 26,802 28,142 29,549 31,027 37 356 Contingencies Contingency 1,203,000 1,215,000 1,215,000 1,215,000 1,215,000 1,215,000 1,215,000 1,215,000 1,215,000 1,215,000 1,215,000 38 357 Employee Fringe Benefits Other Operating 48,000 15,000 15,450 15,914 16,391 16,883 17,389 17,911 18,448 19,002 19,572 39 358 Subscriptions Operating Supplies 300 300 308 315 323 330 338 346 353 361 369 40 360 E-Recording Fees Other Operating 1,000 2,000 2,052 2,103 2,154 2,203 2,254 2,306 2,357 2,408 2,461 41 361 Dues and Memberships Contractual Services 2,000 2,000 2,052 2,103 2,154 2,203 2,254 2,306 2,357 2,408 2,461 42 367 Training and Awards Operating Supplies 60,000 70,000 71,820 73,616 75,382 77,116 78,890 80,704 82,480 84,294 86,149 43 402 Uniform Expense Operating Supplies 38,000 38,000 38,988 39,963 40,922 41,863 42,826 43,811 44,775 45,760 46,766 44 BadDebt Bad Debt Expense Other Operating 156,690 164,280 178,790 192,613 199,355 206,332 208,052 209,748 211,495 213,296 213,296 45 Total Operating Expenses $20,053,120 $20,343,579 $21,268,531 $22,187,957 $22,397,313 $22,612,594 $22,759,376 $22,910,691 $23,064,755 $23,223,715 $23,384,641 Internal Charges 46 501 Internal Services-Central Services Internal Charges $ 5,000 $ 5,000 $ 5,150 $ 5,305 $ 5,464 $ 5,628 $ 5,796 $ 5,970 $ 6,149 $ 6,334 $ 6,524 47 502 Internal Services-Property Management Internal Charges 77,000 77,000 79,310 81,689 84,140 86,664 89,264 91,942 94,700 97,541 100,468 Page 369 of 1707 1-32 Table 1-9 City of Miami Beach,Florida Water and Sewer Rate Study Combined System Projected Combined Water and Sewer Operating Expenses c. t Ft • 8 eaj Yemr tuft:9e,tetaber 30 ._ - f ,-.210',r Cede DesaripHoa ClassIteatlun : -2020 .t 2021 . 2022 2023 2024' .' 2025 2026 2017 2028 2029 2030 48 503 Internal Services-Fleet Management Internal Charges 231,000 231,000 237,930 245,068 252,420 259,993 267,792 275,826 284,101 292,624 301,403 49 505 Internal Services-Self-Insurance Internal Charges 982,000 982,000 1,011,460 1,041,804 1,073,058 1,105,250 1,138,407 1,172,559 1,207,736 1,243,968 1,281,287 50 506 Internal Services-Applications/Computer Hardw Internal Charges 283,000 283,000 291,490 300,235 309,242 318,519 328,075 337,917 348,054 358,496 369,251 51 511 , OIG Funding Internal Charges - 16,000 16,480 16,974 17,484 18,008 18,548 19,105 19,678 20,268 20,876 52 Total Internal Charges $ 1,578,000 $ 1,594,000 $ 1,641,820 $ 1,691,075 $ 1,741,807 $ 1,794,061 $ 1.847,883 $ 1,903,319 $ 1,960,419 $ 2,019,232 $ 2,079.808 53 Total Water System Expenses(425-0410)Expenses $26,602,120 $26,719,579 $27,845,551 $28,972,514 $29,396,145 5 29,832,667 $30,207,890 $30,595,091 $30,992,741 $31,403,244 $31,823,947 Sewer System Expenses(425-0420) Personnel Services 54 III Salaries and Wages Personal Services $ 1,883,000 $ 1,901,000 $ 1,958,030 $ 2,016,771 $ 2,077,274 $ 2,139,592 $ 2,203,780 $ 2,269,893 $ 2,337,990 $ 2,408,130 $ 2,480,374 55 132 Shift Differential Personal Services 3,000 3,000 3,090 3,183 3,278 3,377 3,478 3,582 3,690 3,800 3,914 56 AddPers Additional Personnel Personal Services - - - - - - - - - - - 57 133 Steeplejack Personal Services 10,000 10,000 10,300 10,609 10,927 11,255 11,593 11,941 12,299 12,668 13,048 58 135 Overtime Personal Services 185,000 185,000 190,550 196,267 202,154 208,219 214,466 220,900 227,527 234,352 241,383 59 136 Holiday Pay-Overtime Personal Services 15,000 15,000 15,450 15,914 16.391 16,883 17,389 17,911 18,448 19,002 19,572 60 139 Work Above Classification Personal Services 5,000 5,000 5,150 5,305 5,464 5,628 5,796 5,970 6,149 6,334 6,524 61 153 Allowances Personal Services 109,000 115,000 118,450 122,004 125,664 129,434 133,317 137,316 141,435 145,679 150,049 62 159 Transfers-Pension Obligation Non-Operating 9,000 3,000 3,090 3,183 3,278 3,377 3,478 3,582 3,690 3,800 3,914 63 161 Retirement Contributions-Pension Personal Services 524.000 557,000 573,710 590,921 608,649 626,908 645,716 665,087 685,040 705,591 726,759 64 162 Health and Life Insurance Personal Services 258,000 270,000 283,500 297,675 312,559 328,187 344,596 361,826 379,917 398,913 418,859 65 163 Workmen's Compensation Personal Services 2,000 1,000 1,030 1,061 1,093 1,126 1,159 1,194 1,230 1.267 1,305 66 164 FICA Personal Services 3,000 3,000 3,090 3,183 3,278 3,377 3,478 3,582 3,690 3,800 3,914 67 165 Social Security and Medicare Personal Services 32,000 33.000 33,990 35,010 36,060 37,142 38,256 39,404 40,586 41,803 43,058 68 167 OPEB Contributions Personal Services 36,000 41,000 42,230 43,497 44,802 46,146 47,530 48,956 50,425 51,938 53,496 69 168 OPEB PayGo Personal Services 150,000 162,000 166,860 171,866 177,022 182,332 187,802 193,436 199,240 205,217 211,373 70 Total Personnel Services $ 3,224,000 $ 3,304.000 $ 3,408,520 $ 3,516,446 $ 3,627,892 $ 3,742,980 $ 3,861,834 $ 3,984,580 $ 4,111,354 $ 4,242,293 $ 4,377,540 Operating Expenses 71 311 Temporary Labor Contractual Services $ 3,000 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 72 312 Professional Services Contractual Services 1,149,000 399,000 410.970 423,299 435,998 449,078 462,550 476,427 490,720 505,441 520,605 73 313 Bank Fees Other Operating 260,000 203,000 214,828 226,133 229,525 232,968 234,910 236,825 238,797 240,831 240,831 74 314 Electricity Utilities 500,000 484,000 503,360 523,494 544,434 566,212 588,860 612.414 636,911 662,387 688,883 75 316 Telephone Utilities 27,000 28,000 28,728 29,446 30,153 30,846 31,556 32,282 32,992 33,718 34,459 76 318 Sewer Charges Utilities 48,000 56,000 57,456 58,892 60,306 61,693 63,112 64,563 65,984 67,435 68,919 77 319 Sanitation Fees Utilities 7,000 7,000 7,182 7,362 7,538 7,712 7,889 8,070 8,248 8,429 8,615 78 321 Postage and Shipping Contractual Services 500 500 513 526 538 551 563 576 589 602 615 79 322 Administration Fees Administrative Fees 1,205,000 1,205,000 1,241,150 1,278,385 1,316,736 1,356,238 1,396,925 1,438,833 1,481,998 1,526,458 1,572,252 80 . 323 Rent-Building and Equipment Contractual Services 62,000 62,000 63,612 65,202 66,767 68,303 69,874 71,481 73,053 74,661 76,303 81 325 Contract Maintenance Contractual Services 947,000 963,000 1,001,520 1,041,581 1,083,244 1,126,574 1,171,637 1,218,502 1,267,242 1,317,932 1,370,649 82 327 Advertising Contractual Services 500 500 513 526 538 551 563 576 589 602 615 83 329 Storm Water Utilities - 2,000 2,052 2,103 2,154 2,203 2,254 2,306 2,357 2,408 2,461 84 337 Sewer Treatment Contractual Services 23,535,540 24,786,311 25,677,285 26,568.259 26,568,259 26.568,259 26,568.259 26,568,259 26,568.259 26,568,259 26,568,259 85 34I Supplies-Office Operating Supplies 7,000 7,000 7,182 7,362 7,538 7,712 7,889 8,070 8,248 8,429 8,615 86 342 Contracted Services-Repair and Maintenance Contractual Services 137,000 142,000 147,680 153,587 159,731 166,120 172,765 179,675 186,862 194,337 202,110 87 343 Other Operating Expenditures Other Operating 1,509,000 1,512,000 1,551,312 1,590,095 1,628,257 1,665,707 1,704,018 1,743,211 1,781,561 1,820,756 1,860,812 88 349 Other Contractual Services(DERM) Contractual Services 2,893,000 2,893,000 3,054,908 3,215,673 3,263,913 3,312,873 3,339,897 3,367,737 3,395,181 3,423,465 3,452,619 89 351 Engine Fuel and Lubricants Operating Supplies 7,000 17,000 17,850 18,743 19,680 20,664 21.697 22,782 23,921 25,117 26,373 90 356 Contingencies Contingency 2,009,000 1,821,000 1,821,000 1,821,000 1,821,000 1,821,000 1,821,000 1,821,000 1,821,000 1,821,000 1,821,000 91 357 Employee Fringe Benefits Other Operating 10,000 - - - - - - - - - - - 92 361 Dues and Memberships Contractual Services 1,000 1,000 1,026 1,052 1,077 1,102 1,127 1,153 1,178 1,204 1,231 93 367 Training and Awards Operating Supplies 63,000 73,000 74,898 76,770 78,613 80,421 82,271 84,163 86,015 87,907 89,841 94 402 Uniform Expense Operating Supplies 26,000 26,000 26,676 27,343 27,999 28,643 29,302 29,976 30,635 31,309 31,998 Page 370 of 1707 1-33 Table 1-9 City of Miami Beach,Florida Water and Sewer Rate Study Combined System Projected Combined Water and Sewer OperatinE Expenses ..Ch_ . . e *ie.' CAFR :: i' - Fiscal obrEadie"` a�relier3tl •Nb. Code Desrripttoh Clasalftcatlou.. • . 2020 • 2011 1022 1023 2034 2025 2026 2027 202S 2029 2030 95 BadDebt Bad Debt Expense Other Operating 232,537 240,560 254,576 267,973 271,993 276,073 278,374 280,643 282,980 285,390 285,390 96 Total Operating Expenses $34,639,077 $34,928,871 $36,166,276 $37,404,805 $37,625,992 $37,851.501 $38,057,292 $38,269,524 $38,485,321 $38,708,079 $38,933,456 Internal Charges 97 501 Internal Services-Central Services Internal Charges $ 2,000 $ 2,000 $ 2,060 $ 2,122 $ 2,185 $ 2,251 $ 2,319 $ 2,388 $ 2,460 $ 2,534 $ 2,610 98 502 Internal Services-Property Management Internal Charges 99,000 99,000 101,970 105,029 108,180 111,425 114,768 118,211 121,758 125,410 129,173 99 503 Internal Services-Fleet Management Internal Charges 368,000 368,000 379,040 390,411 402,124 414,187 426,613 439,411 452.594 466,171 480,157 100 505 Internal Services-Self-Insurance Internal Charges 986,000 986,000 1,015,580 1,046,047 1,077,429 1,109,752 1,143,044 1,177,336 1,212,656 1,249,035 1.286,506 101 506 Internal Services-Applications/Computer Hardw Internal Charges 189,000 189,000 194,670 200,510 206,525 212,721 219.103 225,676 232,446 239,420 246,602 102 511 OIG Funding Internal Charges - 12,000 12,360 12,731 13,113 13,506 13,911 14,329 14,758 15,201 15,657 103 Total Internal Charges $ 1,644,000 $ 1,656,000 $ 1,705,680 $ 1,756,850 $ 1,809.556 $ 1,863,843 $ 1,919,758 $ 1,977,351 $ 2,036,671 $ 2,097,771 $ 2,160,704 Total Sewer System Expenses(425-0420)Expenses $39,507,077 $39,888,871 $41,280,476 $42,678,101 $43,063,440 $43,458,324 $43,838,884 5 44,231,455 $44,633,347 $45,048,143 $45,471,701 104 TOTAL COMBINED SYSTEM OPERATING EXPENSES $66,109,197 $66,608,450 $69,126,028 $71,650,615 $72,459,585 $73,290,991 $74,046,774 $74,826,547 $75,626,087 $76,451,388 $77,295,648 CAFR Format: - 105 Personal Services $ 8,173,000 $ 8,079,000 $ 8,336,510 5 8,602,502 $ 8,877,269 $ 9,161,114 $ 9,454,350 $ 9,757,303 $10,070,311 $10,393,724 $10,727,905 106 Operating Supplies 208,300 238,300 244,904 251,473 257,995 264,461 271,101 277,922 284,674 291,607 298,726 107 Contractual Services 44,668,670 45,568,310 47,487,442 49.400,503 49,628,838 49,864,271 50,018,024 50,177,125 50,339,495 50,507,544 50,681,503 108 Utilities 956,000 958,000 1,010,747 1,066,075 1.106,581 1,148,520 1,192,082 1,237,332 1,284,190 1,332,864 1,383,425 109 Internal Charges 3,222.000 3,250,000 3,347,500 3,447,925 3,551,363 3,657,904 3,767,641 3,880,670 3,997,090 4,117,003 4.240,513 110 Administrative Fees 2,400.000 2,400,000 2,472,000 2,546,160 2,622,545 2,701,221 2,782,258 2,865,726 2,951,697 3,040,248 3,131,456 111 Other Operating 3,247,227 3,071,840 3,183,715 3,292,551 3,371,345 3,449.623 3,517,204 3,586,111 3,654,020 3,723,530 3,786,987 112 Contingency 3,212,000 3,036,000 3,036,000 3,036,000 3,036,000 3,036,000 3,036,000 3,036,000 3,036,000 3,036,000 3,036,000 113 Total Current Expenses $66,087,197 $66,601,450 $69,118,818 $71,643.189 $72,451.936 $73,283,112 $74,038,659 $74,818,188 5 75,617,478 $76,442,520 $77,286,514 114 Less Administrative Fees,Depreciation,and Amortization (2,400,000) (2,400,000) (2,472,000) (2,546,160) (2,622,545) (2,701,221) (2,782,258) (2,865,726) (2,951,697) (3,040.248) (3,131,456) 115 Current Expenses for Debt Service Coverage Purposes 563.687,197 $64,201,450 $66,646,818 $69,097,029 $69,829,392 $70,581,891 $71,256,401 $71,952,463 $72,665,781 $73,402,272 $74,155,059 Page 371 of 1707 ' 1-34 Table 1-10 City of Miami Beach,Florida Water and Sewer Rate Study Water and Sewer System Escalation References ..: • ,....-.. Fberl.Year Endln.Se ,mber 30 ' .Deeeriptlen Reference 202.1 . -2021 - " .2023 2024 ` 2015 1026 2021 028 2029 2030 1 Constant Factor Constant 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 2 General Inflation(CPI Price Index)[1] Inflation 1.0250 1.0260 1.0250 1.0240 1.0230 1.0230 1.0230 1.0220 1.0220 1.0220 3 Labor Labor 1.0300 1.0300 1.0300 1.0300 1.0300 1.0300 1.0300 1.0300 1.0300 1.0300 4 Health Insurance Healthlns 1.0500 1.0500 1.0500 1.0500 1.0500 1.0500 1.0500 1.0500 1.0500 1.0500 5 Customer Growth+Inflation-Water Cust-Water 1.0250 1.0260 1.0250 1.0240 1.0230 1.0230 1.0230 1.0220 1.0220 1.0220 6 Customer Growth+Inflation-Sewer Cust-Sewer 1.0250 1.0260 1.0250 1.0240 1.0230 1.0230 1.0230 1.0220 1.0220 1.0220 7 Water Rate Revenue WRevenue 1.0484 1.0883 1.0773 1.0350 1.0350 1.0083 1.0082 1.0083 1.0085 1.0000 8 Wastewater Rate Revenue SRevenue 1.0345 1.0583 1.0526 1.0150 1.0150 1.0083 1.0081 1.0083 1.0085 1.0000 9 Repair and Maintenance Repair 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 10 Water Billed+Inflation Bill-W 1.0470 1.0721 1.0690 1.0240 1.0230 1.0230 1.0230 1.0220 1.0220 1.0220 11 Wastewater Billed+Inflation Bill-S 1.0491 1.0679 1.0652 1.0240 1.0230 1.0230 1.0230 1.0220 1.0220 1.0220 12 Water Produced+Inflation Prod-W 1.0470 1.0721 1.0690 1.0240 1.0230 1.0230 1.0230 1.0220 1.0220 1.0220 13 Wastewater Treated+Inflation Treat-S 1.0250 1.0260 1.0250 1.0240 1.0230 1.0230 1.0230 1.0220 1.0220 1.0220 14 Electricity-Commodity ElectricCommod 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 15 Electricity-Water ElectricW 1.0623 1.0867 1.0847 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 16 Electricity-Wastewater ElectricS 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 17 Chemicals-Commodity ChemicalCommod 1.0400 1.0400 1.0400 1.0400 1.0400 ' 1.0400 1.0400 1.0400 1.0400 1.0400 18 Chemicals-Water ChemicalW 1.0623 1.0867 1.0847 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 19 Chemicals-Wastewater ChemicalS 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 20 Fuel Fuel 1.0500 1.0500 1.0500 1.0500 1.0500 1.0500 1.0500 1.0500 1.0500 1.0500 21 Inflation/Employee Growth Inf/Emp 1.0250 1.0260 1.0250 1.0240 1.0230 1.0230 1.0230 1.0220 1.0220 1.0220 22 Property/General Insurance Liability Insurance 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 23 Marginal Escalator Marginal 1.0100 1.0100 1.0100 1.0100 1.0100 1.0100 1.0100 1.0100 1.0100 1.0100 24 Elimination Factor Eliminate 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 25 Payment to General Fund GenFund 1.0300 1.0300 1.0300 1.0300 1.0300 1.0300 1.0300 1.0300 1.0300 1.0300 26 Late Fees LateFees 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 27 Miami-Dade Wholesale Water Rate Increas MDBuIkW 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 28 Miami-Dade Wholesale Sewer Rate thereat MDBuIkS 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 29 Additional Item 1 Addl 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 30 Additional Item 2 Add2 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Footnotes: I I Estimates based on projections contained in"The Budget and Economic Outlook:2020 to 2030"published by the Congressional Budget Office in January 2020. Page 372 of 1707 1-35 Table 1-11 City of Miami Beach,Florida • Water and Sewer Rate Study Projection of Wholesale Water and Sewer Charge:from Miuuti-Dade('ounb' 1 -;g 3 r. a r- 'PiiiindUt' ,.. '',_ ,i.,: «i - i ' ;.,,., . _ . . ' •- 0I'O)lr,...i;9a'..t'36• ' • ' 2 I I I F.. Durae6 jl9aa IMeranob 167 50 Miami-Dade County Wholesale Water Charges I ,Waley Sales(0000 Gallons) 6,860,900 6,163,293 6295,515 6,576,207 6.860,900 6,860,900 6.860.900 6,860.900 6.860.900 6.860.900 6,860,900 6,860,900 2 Percent Purchased from Miami-Dade County 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 3 Amount Parcheesi from Miami lade(0000 Gallons) 6,860,900 6,163,293 6,295.515 6,578,207 6.860.900 6.860.900 6,860,900 6,860,900 6,860,900 6,860,900 6,860,900 6.860,900 4 Allowance I Non.Reo nue Wain 15.39% 15.39% 15.39% 15.39% 15.39% 15.39% 15.39% 15.39% 15.39% 15.39% 15.39% 15.39% 5 Projected Water Purchases(000's Gallons)[Line I/(1•Line 4)1 8.345,720 8,429,053 8,566,212 8.413,202 &109,301 7.284,759 7,441,040 7,775.170 8,109,301 8.109.301 8,109301 8.109.301 8,109,301 8.109301 8.109,301 8,109,301 6 Projected Water Treatment(MOD) 22.22 19.96 20.39 21.30 22.22 22.22 22.22 22.22 22.22 22.22 22.22 22.22 7 Volumetric Charges 8 Total Flow(000's Gallons) 8,109,301 7,284.759 7,441,040 7.775,170 8.109,301 8,109,301 8,109,301 8,109,301 8,109,301 8,109,301 8,109301 8,109.301 9 Rate Per 1,000 Gallons MDBuIkW 0 1.6904 S 1.7947 S 1.7947 S 1.7947 S 1.7947 S 1.7947 S 1.7947 $ 1.7947 S 1.7947 S 1.7947 S 1.7947 10 Total Miami•Dade County Wholesale Water Charges S 12,314,156 S 13,354.434 0 17.954.098 S 14,553,763 0 14,553,763 S 14,553,763 S 14,553,763 $14,553,763 S 14,553,763 S 14,553,763 0 14,553.763 Miami-Dade County Wholesale Sewer Charges II Billed Wastewater Flow to Miami-Reach Custmram(000'.Gallons) 4.777.381 4,314.742 4,416,381 4.596,881 4,777,381 4,777,381 4,777381 4,777.381 4.777,381 4.777.381 4.777,381 4,777.381 12 City of Miami Beach Gallons Treated By Miam14)We('oun9' 7.152.301 6.459.676 6,611.841 6.882.071 7.152.301 7,152,301 7,152301 7,152.301 7,152,301 7.152,301 7,152,301 7,152,301 13 Allowance for Inflow and Infiltration/Unbilled Sewer 33.20% 33.20% 33.20% 33.20% 33.20% 33.20°% 33.20% 33.20% 33.20% 33.20% 33.20% 33.20% 14 Flow from Satellite Cities 905,768 905.768 905,768 905,768 905.768 905.768 905,768 905.768 905.768 905,768 905.768 905.768 15 Projected Wastewater Flow Treated(000's Gallons)[Line 12 0 Line 141 8,398,801 8,796,945 8.054,079 8.082,041 8.058,069 7365,444 7,517,610 7,787,839 8.058.069 8.058.069 8.058.069 8.058.069 8,058,069 8,058.069 8,058,069 8.058,069 16 Projected Wastewater Treatment(MGD) 22.077 20.179 20.596 21.337 22.077 22.077 22.077 22.077 22.077 22.077 22.077 22.077 Volumetric Changes 17 Total Flow(000's Gallons) 7,365,444 7,517.610 7,787,839 8,058,069 8.058,069 8,058.069 8.058,069 8,058.069 8,058.069 8.058.069 8.058.069 18 Average Rate Per 1.000 Gallons MDBulkS S 3.1954 S 3.2971 S 3.2971 S 3.2971 S 3.2971 S 3.2971 S 3.2971 S 3.2971 0 3.2971 5 3.2971 S 3.2971 19 Total Miami•Dade County Wholesale Sewer Charges S 23,535,540 0 24,786,311 S 25,677,285 S 26,568,259 0 26,568,259 S 26,568,259 S 26,568,259 S 26,568,259 S 26,568.259 0 26,568,259 0 26,568,259 20 Total Miami-Dade County Wholesale Ckarges 035.849,696 538,140.745 539,631,383 041.122,022 041,122,022 541.122,022 541,122,022 541.122,022 $41,122,022 541,122,022 $41,122,022 1'1 Historical and projected billed wastewater Row by entity is as fidlows: Historical Wastewater Flow By Entity 1'1 Historical Fiscal Ended September 30. Entity 2015 2016 2017 2018 2019 City of Miami Beach 7,625,118 8,021,330 7,223,208 7,256,958 7.152,301 Sal5Ilitc Municiwlitice Village of Bal Barbour 279,283 280.417 275,540 2132.491 301,828 Town of6ay Harbor Islands 236,114 234,893 240,092 230,405 272,204 goon of Surfside 258,286 260.305 315,239 312,186 331.736 Total Flow from Satellite Municipalities 773,683 775,615 830,871 825.083 905.768 Total Billed Wastewater Flow(kgall 8,398,801 8,796,945 8,054,079 8,082,041 8,058,069 1'I Amounts shown are in thousands ofgallons 1kga0. Page 373 of 1707 1.30 Table 1-12 City of Miami Beach,Florida Water and Sewer Rate Study Water and Sewer System • Debt Service Allocation to Individual Systems ? ;..: m ,,:. . . , • .' lterceitt :-. - k ''Mei*: eat:" ildi ,fet'n.-"36 M,:`lleticNFtion Water Senrer - tit , . • 02 2022 . . 2024 .. 2020 2026 • 2027 • '2618 . . 2029 2030 EXISTING DEBT SERVICE Existing Senior Lien Debt Water and Sewer Revenue Refunding Bonds,Taxable Series 20093-IA I Amount Funded 41.00% 59.00% $ 5,780,000 2 Start Balance $ 5,780,000 $ - $ - S - $ - $ - $ - $ - S - $ - $ - 3 Plus:Interest 196.538 - - - - - - - - - - 4 Less:Payments 3,021,538 - - - - - - - - - - 5 Balance End of Year $ 2,955,000 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Water and Sewer Revenue Refunding Bonds.Taxable Series 20093-1B 6 Amount Funded 41.00% 59.00% $ 10,000.000 7 Start Balance $ 10,000.000 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 8 Plus:Interest 450,000 - - - - - - - - - - • 9 Less:Payments 450.000 - - - - - - - - 10 Balance End of Year $ 10.000,000 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Water and Sewer Revenue Refunding Bonds,Taxable Series 20091-1C II Amount Funded 41.00% 59.00% 5 30.000.000 12 Start Balance 5 30.000.000 $ - $ - $ - S - $ - $ - $ - S - $ - $ - 13 Plus:Interest 1.350.000 - - - - - - - - - - 14 Less:Payments 1.350,000 - - - - - - - - - - 15 Balance End of Year $ 30,000,000 5 - S - $ - $ - $ - $ - $ - $ - $ - $ - Water and Sewer Revenue and Revenue Refunding Bonds.Series 2017 16 Amount Funded 41.00% 59.00% $ 115.180.000 17 Start Balance $ 113.090,000 5 111,555,000 $ 110.055,000 $108,650,000 $ 107,175,000 $ 105,625.000 S 100,415,000 $ 94.940.000 $ 90,760,000 5 86,375,000 $ 81,770,000 18 Plus:Interest 5.370,800 5.309.400 5.234,400 5,164.150 5,090,400 5,012.900 4,752,400 4,478,650 4.269,650 4,050,400 3,820,150 19 Less:Payments 6,905,800 6.809.400 6.639.400 6,639.150 6,640.400 10.222,900 10,227,400 8.658,650 8,654,650 8,655.400 8,655,150 20 Balance End of Year 5 111.555.000 $ 110,055,000 $ 108,650,000 $ 107.175.000 $ 105.625,000 $ 100.415.000 S 94,940,000 5 90,760,000 $ 86,375,000 $ 81,770.000 $ 76,935,000 Water and Sewer Revenue Refunding Bonds,Series 21 Amount Funded 41.00% 59.00% $ 39,780400 22 Start Balance $ - $ 39,780,000 $ 39,780,000 $ 39,780,000 $ 37,690.000 $ 35,565.000 5 35,515,000 $ 35,465,000 $ 35,335,000 $ 35.200,000 $ 35.060,000 23 Plus:Interest - 530,400 795,600 774,700 732.550 710.800 709,800 708,000 705,350 702,600 699,750 24 Less:Payments - 530,400 795,600 2.864,700 2,857,550 760,800 759,800 838,000 840,350 842,600 844,750 25 Balance End of Year 5 - $ 39,780,000 $ 39,780.000 $ 37,690.000 $ 35.565,000 $ 35,515,000 $ 35,465,000 S 35.335.000 $ 35,200,000 $ 35,060,000 $ 34,915,000 Total Existing Senior Lien Debt 26 Amount Funded $200.740,000 27 Start Balance $ 158,870.000 $ 151,335,000 $ 149,835,000 $148,430.000 $ 144,865,000 $ 141,190,000 $ 135,930,000 5 130.405400 $ 126,095,000 $ 121,575,000 $ 116.830,000 28 Plus:Interest 7,367,338 5,839,800 6,030,000 5.938,850 5,822,950 5.723,700 5,462.200 5,186,650 4,975,000 4.753.000 4,519,900 29 Less:Payments 11.727.338 7,339,800 7,435,000 9,503.850 9,497,950 10,983.700 10,987,200 9,496,650 9,495,000 9,498,000 9,499,900 30 Balance End of Year $ 154.510.000 $149,835,000 $ 148,430,000 $ 144,865,000 $ 141,190.000 $135,930,000 $ 130,405,000 $126,095,000 $ 121,575,000 $ 116,830,000 $ 111,850,000 Page 374 of 1707 1-37 Table 1-12 City of Miami Beach,Florida Water and Sewer Rate Study Water and Sewer System Debt Service Allocation to Individual Systems PeP'cc�t .. "'` - �°IxcaLYnitY'EutB ;Se`eri>Citet`3b, m"1M++§ePNptltia Water - Snwat 21rt..j - .10 1 2022 2022 • '2024 ' "' 2024. . 026 202 .. . 2128 2029 2030 Total Existing Debt 31 Amount Funded $200.740,000 32 Start Balance $ 158,870,000 5 151,335.000 $ 149,835,000 $148,430,000 5 144.865.000 $ 141,190.000 $ 135,930,000 $ 130.405,000 $126.095.000 5 121,575,000 $ 116.830,000 33 Plus:Interest 7,367,338 5,839,800 6,030,000 5,938,850 5,822,950 5,723,700 5,462.200 5,186,650 4,975,000 4,753,000 4,519.900 34 Less:Payments 11,727,338 7.339,800 7.435,000 9,503,850 9,497,950 10,983,700 10,987,200 9,496,650 9,495,000 9.498,000 9,499,900 35 Balance End of Year $ 154,510,000 $ 149,835,000 $ 148,430,000 $ 144,865,000 $ 141,190,000 $ 135,930,000 $ 130,405,000 $ 126,095.000 $ 121,575,000 $ 116.830,000 $ 111,850,000 PROPOSED DEBT SERVICE Proposed Senior Lien Debt Series 2022 Bonds 36 Amount Funded 59.10% 40.90% $ 50,655.000 37 Start Balance $ - $ - $ 50,655,000 $ 50,655,000 $ 50,655,000 $ 50,655,000 $ 50,655,000 $ 50,655,000 $ 50,655.000 5 50,655,000 $ 50,655,000 38 Plus:Interest - - 1.463,367 2,532,750 2,532.750 2,532,750 2,532,750 2,532,750 2,532,750 2,532,750 2532,750 39 Less:Payments - - 1,463,367 2,532,750 2,532,750 2,532,750 2,532,750 2,532,750 2,532,750 2,532,750 2,532,750 40 Balance End of Year $ - $ - $ 50.655,000 $ 50,655,000 $ 50,655,000 5 50,655,000 $ 50,655,000 $ 50,655,000 $ 50,655.000 5 50,655,000 $ 50.655,000 Total Proposed Senior Lien Debt 41 Amount Funded $ 50,655.000 42 Start Balance $ - $ - $ 50,655,000 $ 50,655,000 $ 50,655,000 $ 50,655.000 $ 50,655,000 $ 50,655,000 $ 50,655,000 $ 50,655,000 $ 50,655,000 43 Plus:Interest - - 1.463,367 2,532.750 2,532,750 2,532,750 2532,750 2,532,750 2,532.750 2,532,750 2,532,750 44 Less:Payments - - 1,463,367 2,532,750 2532.750 2,532,750 2,532,750 2,532.750 2,532,750 2,532,750 2,532,750 45 Balance End of Year S - $ - $ 50.655,000 $ 50,655.000 $ 50.655,000 $ 50,655,000 $ 50,655.000 $ 50,655,000 $ 50,655.000 $ 50,655,000 $ 50.655,000 Total Proposed Debt 46 Amount Funded $ 50,655,000 47 Start Balance $ - 5 - $ 50,655,000 $ 50,655.000 $ 50,655,000 $ 50,655,000 5 50,655,000 $ 50.655.000 $ 50.655.000 $ 50,655,000 $ 50,655,000 48 Plus:Interest -- 1,463,367 2,532,750 2,532,750 2.532,750 2,532,750 2,532,750 2,532,750 2,532,750 2,532,750 49 Less:Payments - - 1,463,367 2,532,750 2,532,750 2,532,750 2,532,750 2,532,750 2532,750 2,532,750 2532,750 50 Balance End of Year $ - $ - $ 50.655,000 $ 50,655.000 $ 50,655,000 $ 50,655,000 $ 50,655,000 $ 50.655,000 $ 50,655,000 5 50,655,000 $ 50,655,000 TOTAL DEBT 51 Amount Funded $251.395,000 52 Start Balance $ 158,870,000 $ 151,335,000 $200.490,000 $ 199,085,000 $ 195,520,000 $ 191.845,000 $186,585,000 $ 181.060,000 5 176,750,000 $ 172,230.000 5 167,485,000 53 PIus:Interest 7.367,338 5,839,800 7.493.367 8,471,600 8,355,700 8,256,450 7,994,950 7.719,400 7,507,750 7.285,750 7,052,650 54 Less:Payments 11,727,338 7.339.800 8,898,367 12,036,600 12,030,700 13,516,450 13,519,950 12,029,400 12,027.750 12,030,750 12,032,650 55 Balance End of Year $ 154,510.000 $ 149,835,000 $ 199,085,000 $195,520,000 $ 191,845,000 $186,585,000 $ 181,060.000 $ 176,750,000 $ 172,230,000 $167,485,000 $ 162.505,000 56 Total interest Payments $ 7.367,338 $ 5.839,800 $ 7.493.367 $ 8,471.600 $ 8,355,700 $ 8.256,450 $ 7,994,950 $ 7.719.400 $ 7,507.750 $ 7,285,750 $ 7,052,650 57 Total Principal Payments 4,360,000 1,500,000 1,405,000 3,565,000 3,675,000 5,260,000 5,525,000 4,310,000 4,520,000 4,745,000 4,980,000 58 Total Debt Service $ 11,727,338 $ 7.339.800 $ 8,898.367 $ 12.036,600 $ 12,030,700 $ 13,516,450 $ 13.519,950 $ 12,029,400 $ 12,027,750 $ 12,030,750 $ 12,032,650 Page 375 of 1707 1-38 Table 1-12 City of Miami Beach,Florida Water and Sewer Rate Study Water and Sewer System Debt Service Allocation to Individual Systems :•. Percent • Fbeai.Ye9r'pndln;Se.fetnher30. Descrtptton - Water Sewer OZO'- . 2021 2022 2023 2024 2025 2026 21.7 .:5028 2029 2030 WATER SYSTEM DEBT SERVICE Water and Sewer Revenue Refunding Bonds.Taxable 59 Series 20091-IA 41.00% $ 1.238.831 $ - $ - $ - $ - S - $ - $ - $ - $ - $ - Water and Sewer Revenue Refunding Bonds,Taxable 60 Series 20091-IB 41.00% 184,500 - - - - - - - - - Water and Sewer Revenue Refunding Bonds,Taxable 61 Series 20091-1C 41.00% 553,500 - - - - - - - - - - Water and Sewer Revenue and Revenue Refunding 62 Bonds,Series 2017 41.00% 2.831.378 2,791.854 2,722,154 2.722,052 2.722.564 4.191,389 4,193,234 3.550,047 3.548.407 3,548.714 3,548,612 Water and Sewer Revenue Refunding Bonds.Series 63 2020 41.00% - 217,464 326,196 1,174.527 1,171,596 311,928 311,518 343.580 344,544 345,466 346,348 64 Series 2022 Bonds 59.10% - - 864.889 1,496,924 1,496,924 1,496,924 1.496.924 1,496,924 1,496.924 1,496,924 1,496,924 65 Total $ 4.808.209 5 3.009,318 $ 3,913,239 $ 5,393,502 $ 5,391,083 $ 6,000.241 S 6,001.676 $ 5,390,550 $ 5.389.874 $ 5,391,104 $ 5,391.883 SEWER SYSTEM DEBT SERVICE Water and Sewer Revenue Refunding Bonds,Taxable 66 Series 20093-1A 59.00% $ 1.782.707 5 - $ - $ - $ - $ - $ - $ - $ - $ - $ - Water and Sewer Revenue Refunding Bonds,Taxable 67 Series 20091-1B 59.00% 265.500 - - - - - - - - - - Water and Sewer Revenue Refunding Bonds,Taxable 68 Series 20091-1C 59.00% 796,500 - - - - - - - - - - Water and Sewer Revenue and Revenue Refunding 69 Bonds,Series 2017 59.00% 4,074,422 4.017,546 3,917.246 3,917,099 3.917,836 6,031,511 6,034,166 5,108.604 5.106,244 5.106,686 5,106.539 Water and Sewer Revenue Refunding Bonds,Series 70 2020 59.00% - 312.936 469,404 1,690.173 1,685.955 448,872 448,282 494.420 495,807 497,134 498,403 71 Series 2022 Bonds 40.90% - - 598,478 1.035,826 1,035,826 1,035,826 1,035.826 1,035,826 1,035,826 1,035,826 1,035,826 72 Total $ 6,919,129 $ 4.330,482 $ 4,985,128 5 6,643.098 $ 6.639.617 $ 7.516.209 $ 7.518,274 $ 6.638,850 $ 6.637,876 $ 6.639.646 $ 6,640.767 73 Water System(%) 41.00% 41.00% 43.98% 44.81% 44.81% 44.39% 44.39% 44.81% 44.81% 44.81% 44.81% 74 Sewer System(%) 59.00% 59.00% 56.02% 55.19% 55.19% 55.61% 55.61% 55.19% 55.19% 55.19% 55.19% 75 Total 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% Page 376 of 1707 1-39 Table 1-13 . City of Miami Beach,Florida Water and Sewer Rate Study Estimated Multi-Year Capital Improvement Program and Funding Sources . . .' PlecalYeartadthi Sn,lri bet3U.'. ., :.„..., • Praket 17e)eet Broadlea P,e•tatian Adjruted jtbi'•.866 i$pgne Number Nmaler . ,8oatee Patter 2020 2021 .• 2022 2023 2024 21125 1826 2027 3028 2029 2030 Total WATER SYSTEM CAPITAL IMPROVEMENT PROGRAM Departmental Capital I Vehicles and Equipment-Water REV None $ 160,000 $ 997,000 S 210.804 1 139.000 S 152.870 S 184.338 S 4.867 S 264.126 S 264.126 S 264,126 $ 264,126 $ 2,905.381 2 Other Depanmeraal Capital-Water • REV None 485.000 475,000 475.000 475.000 475.000 475.000 475.000 475.000 475.000 475.000 475.000 5.235000 3 Subtotal-Departmental Capital $ 645,000 S 1.472.000 S 685,804 S 614,000 $ 627.870 $ 659338 S 479.867 S 739.126 $ 739,126 5 739,126 $ 739,126 $ 8.140,381 Major Capital Pmkeets 4 W2 Booster Station Rehabilitation 28520 W-02 2017Bonds None $ 1,200.000 $ - $ - $ - $ • S - $ - $ - $ - $ - $ - 5 1200000 5 Fire Hydrant Density Evaluation 0 W-31 CRF None 150,000 - - - - - - - - - 150.000 6 Replacemem of WM aerial crossings Venetian Isles 28520 W-36 2017Bonds None 4,420,000 - - - - - - - - - 4,420,000 7 Rehabilitation of WM aerial crossings on MacArthur 28520 W-37 2017Bonds None 1.547.000 - - - - - - - - - - 1.547000 8 Rehabilitation of WM aerial crossings on MacArthur 28520 W-37 BI - - - 724,478 - - - - - - - 724.478 W-45A/W-45B/W-45C/W 9 Water Man PoF/CoF Priority I 28520 45D/W-45F 2017Bonds None 180.000 3,298,575 - - - - - - - - - 3,478575 W-45A/W-458/W45C/W. 10 Water Man PoF/CoF Priority I 28520 45D/W-45F 131 - - 3588.494 9.408.379 7.132,123 - - - - - - 20,128.997 W-45A/W45B/W45C/W. I I Water Man PoF/CoF Priority I 28520 45O/W45F CRF - - - - 1.520.226 - - - - - - 1,520,226 12 Fire Flow Project l 28520 W-14 CRF None 520,000 - - - - - - - - - 520000 13 Fire Flow Project 13 28520 W-26 CRF None - 484,100 - - - - - - - - - 484.100 14 Fire Flow Project 2 28520 W-15 CRF None - - 456.187 - - - - - - - - 456.187 15 Fire Flow Project 3 28520 W-16 CRF None 250.000 - - - - - - - - - 250.000 16 Fire Flow Project 4 28520 W-17 CRF None - .169.744 - - - - - - 169,744 17 Fire Flow Project 15 28520 W-28 CRF None - - 307,661 . - - - - - - - 307.661 18 Fire Flow Project 6 28520 W-19 CRF None - - - 98.345 - - - - - - • 98.345 19 Fire Flow Project 8 28520 W-21 CRF None - - - 131.127 - - - - - - - 131.127 20 Fire Flow Project 10 28520 W-23 CRF None - - - 87.418 - - - - - - - 87.418 21 . Fire Flow Project II 28520 W-24 CRF None - - - 109.273 - - - - - - - 109,273 22 Fire Flow Project 12 28520 W-25 CRF None . - - 87,418 - - - - - - - 87,418 23 Fire Flow Project 5 28520 W-I8 CRF None 150,000 - - - - - - - - - 150.000 24 Meter Replacement 60319 N/A 2017Bonds None 7,483,267 . - - - - - - - - - 7.483,267 25 Meter Replacement 60319 N/A CRF 3.621,627 - - - - - - - - - - 3.621,627 26 Surge and Water Hammer Analysis 0 W-32 CRF None 200,000 - - - - - - - - - - 200,000 27 Installation of Additional Pressure Monitoring Devices 0 W-33 CRF None 100.000 - - - - - - - - - - 100,000 28 Installation of Additional Blow-offvalves 0 W-34 CRF None 50,000 - - - - - - - - - 50.000 29 Development of a Distribution System Flushing Plan 0 W-35 CRF None 200.000 - - - - - - - - - 200,000 30 Valve Assessment and Replacement Program NEW W-51A/W-51B/W-5IC CRF None 350000 360.500 371.315 - - - - - - - - 1,081,815 31 Water SCADA 20719 N/A CRF None 406,313 - - - - - - - - - 406.313 32 Fire Flow Project 7 28520 W-20 CRF None - 72,100 - - - - - - - - - 72.100 33 Fire Flow Project 16 28520 W-29 CRF None - 638,600 - - - - - - - 638,600 34 Construction of New Booster Station 28120 W-07 2017Bonds None - 5.592.900 - - - - - - - - 5592,900 35 Aerial Crossing Water Main Replacement 28520 W38 2017Bonds None - 72,100 - - - - - - - - - 72,100 36 Aerial Crossing Water Main Replacement 28520 W-39 2017Bonds None - 206.000 - - - - - - - - - 206.000 37 Aerial Crossing Water Main Replacement 28520 W-40 2017Bonds None - 185.400 - - - - - - - - - - 185.400 38 Water Mainon MacArthur Causeway-Capacity 28520 W-12 BI None - - 4.105.683 - - - - - - - - 4.105.683 39 Belle Isle Booster Station Rehabilitation 28120 W-05 131 None - - 4,710396 - - - - - - 4310,396 40 Fire Flow Project 9 28520 W-22 CRF None - - - - 821.621 - - - - - - 821,621 41 Fire Flow Project 14 28520 W27 CRF None - - - - 855387 - - - - - 855.387 42 Water Pump Station Generators Replacement/New Install 0 0 CRF None - 500,000 250.000 250,000 250.000 - - - - . - 1250,000 43 Normandy Isle Booster Station(W-3)R&R CRF None - - - - - - 1,454000 - - - - 1.454.000 44 Tenminai Island Booster Station(W-7)R&R CRF None - - - - - - 2,220000 . _ - - - 2,220,000 Water Main Aerial Crossing along Alton Road Between Chase Avenue and 45 West 34th Street Rehabilitation CRF None - - - - - 70,000 - - - - 70,000 Water Main Aerial Crossing Along Biartitz Drive between South Shore Drive and Calais 46 Drive Rehabilitation CRF None - - - - - - 70.000 - - - - 70,000 Water Main Aerial Crossing Along Wayne Avenue Pedestrian Bridge 47 Between Wayne Avenue and Tatum Waterway Rehabilitation CRF None - - - - - - 50.000 - - - - 50,000 Water Main Aerial Crossing along Alton Road between West 48th Street 48 and Lakeview Drive Rehabilitation CRF None - - - - - 200.000 - - - - 200.000 49 Water Maim PoF/CoF-Priority 2 CRF None - - - - - 3,618,000 - . - - 3,618,000 50 25th Street Booster Station(W-I)R&R CRF None - - - - - - 2,504,000 - - - 2,504,000 51 41st Street Booster Station(W-4)R&R CRF None - - - - - - - 2,896,000 - - - 2,896,000 52 Capacity-Project 2(Julia Tuttle Causeway) CRF None - - - - - - - 22.820,000 - - 22.820.000 53 Water Mains PoF/CoF-Priority 2 CRF None - - - - - - - - - 3.618.000 - 3.618.000 54 Water Mains PoF/CoF-Priority 2 CRP None • - - - • - - - - - 3.618,000 3018.000 Page 377 of 1707 - 140 Table 1-13 City of Miami Beach,Florida Water and Sewer Rate Study Estimated Multi-Year Capital!infirm enters t Program and hi[Wine Sources ._ .. ,.. ...- :Se...tber'30 . -, ins Project Project Punrkog Escalation Adjusted a - 0et 1110100 Namber Nttt96er 5n9,ee Hader 2030 2021 2022 202J 2021 2025 2026 2027 2028 0;,, D 2529 28311 Total 55 Subtotal-Major Capital Projects $20828206 $11,410,275 $13,959.480 S 10,896.439 1 10579357 $ - $ 7.682,000 $ 5,400000 $22,820,000 S 3.618,000 $ 3.618,000 $ 110,811.757 56 TOTAL WATER SYSTEM CAPITAL IMPROVEMENT PROGRAM $21,473206 $12,882,275 S 14,645,284 $11510,439 S 11,207,227 $ 659338 $ 8,161,867 S 6,139,126 $23,559,126 S 4.357.126 S 4,357.126 S 118.952,139 SEWER SYSTEM CAPITAL IMPROVEMENT PROGRAM Departmental Capital 57 Vehicles and Equipment-Sewer REV None $ - 5 1,194.000 S 308.444 S 34,313 S 1564.573 S 642366 $ 267,578 5 544.468 $ 544.468 5 544.468 S 544.468 $ 5,989,145 58 Other Departmental Capital-Sewer REV None 25,000 24,000 24,000 24,000 24,000 24000 24,00D 24,000 24,000 24.000 24,000 265,000 59 Subtotal-Depanmemal Capital $ 25,000 $ 1,218,000 $ 332.444 0 58.313 $ 1.388.573 S 666.366 $ 291,578 $ 561468 $ 560468 $ 568,468 $ 568.468 5 6,259,145 Major Capital Projecb 60 Water Pump Station Generators Replacement/New Install 0 0 CRF None - - - - - - - - - - - - 61 Gravity Main Replacement-Priority I 28520 S-04 2017Bonds None S 926,000 $ 953.780 S - S - S - $ - S - 5 - $ - S - S - 0 1,879,780 62 Gravity Main Replacement-Priority l 28520 S-04 BI - - 982,393 1,011865 1,042,221 - - - - - - 3,036.480 63 Gravity Mains VI Reduction-Priority 1(a) 28520 S-0 IA 2017Borals None 730000 751.900 - - - - - - - - - 1.481.900 64 Gravity Mains VI Reduction-Priority I(a) 28520 S-01A BI - - 774.457 - - - - - - - - 774.457 60 Gravity Siphon Inspection and Capacity Evaluation 1114/A 5-08 CRF None 30.000 - - - - - - - - - - 30000 66 Venetian Way Aerial Crossing Replacement in Kind 28520 S-IS CRF None 770,000 - - - - - - - . - - - 770.000 67 Valve Assessment and Replacement NEW S-37A/S-378 CRF None 550.000 566.500 583,495 - - - - - - - - 1.699.995 68 Pump Station No.2 Force Main Replacement 28520 5.09 20I7Bmds None 2,550.000 - - - - - - - - - • 2,550000 69 Force Mains PoF/CoF Priority I 28520 0-31 A/5-SI BlS-3 IC 2017Bonds None 1.850,800 1,545,000 - - - - - - - - - 3.395,000 70 Force Mains PoF/CoF Priority I 28520 S-31A/S-31 B/S-3IC BI - - 1,930.838 1.988,763 2.048.426 - - - - - - 5,968,027 71 Force Mains PoF/CoF Priority l 28520 S-31A/S-31B/S-31C 2017Bonds None 450,000 - - - - - - - - - - 450.000 72 Pump Station No.18 Force Main Replacement 28520 S•13 2017Bonds None 550.000 - - - - - - - - - - 550.000 73 Odor Control System 28320 N/A 2017Bonds None 850.600 • - • - - - - - - - 850.600 74 Sewer SCADA 20719 N/A CRF None 1,211938 - - - - - - - - - - 1218.938 75 Manhole Inspection and Rehabilitation 28220 N/A CRF None 1.500.000 1.545.000 1391,350 1,639,091 1,688,263 - - - - - - 7,963,704 76 Pump Station 6.7 and 8 Rerouting 28520 5-17 2017Bonds None - 1.194.800 - - - - - - - - - 1,194,800 77 Aerial Crossing Pine Tree Drive 5151 Street to 47th St. 28520 9-19 2017Bords None - 700,400 - - - - - - - - - 700,400 78 Pump Station No.28 Rehabilitation 20619 S-28 2017Bonds None - 11.103.400 - - - - - - - - - 11.103,400 79 Pump Station No.I Rehabilitation 20619 5-22 B None - - 3.140.264 - - - - - - - - 3.140,264 80 Pump Station No.30.Well Lining,and Electrical Upgrades 20619 0-30 B None - - 2,068,755 - - - - - - - 2.068.755 81 Pump Station No.4 Force Main Replacement 28520 S-10 B None - - 477,405 - - - - - - - - 477,405 82 Pump Stations No.5 Force Main Replacement 28520 S-11 B None - - 413,751 - - - - - - - - 413.751 83 Pump Station No.14 Force Main Replacement 28520 5-12 B None - - 901,765 - - - - - - - - 901,765 84 Pump Station No.23 Force Main Replacement 28520 6-14 B None - - 53.045 - - - - - - - - 53,045 85 Pump Station No.27 Force Main Replacement 28520 S-I5 B None - - 53,045 - - - - - - - - 53,045 86 Gravity Mains Vl Reduction-Priority 1(b) 28520 S-0113 B None • - - 1794,804 1,848,648 - - - - - 3,643.452 87 Sewer Pump Station Germentorr Replacement/Install 0 0 CUE None - 750,000 750000 750,000 750.000 - - - - - - 3,000.000 88 Gravity Main Replacement-Priority 2 S-05a CRP None - - 1,902,000 - - - - - 1.902.000 Aerial crossing Along Pine Tree Drive Between La 89 Gome Circle and North Bay Road Rehabilitation S-20 CRF None - - - - - 50,000 - - - - - 50,000 Aerial crossing along 71st Street Between Bay Drive and Bonita Drive 90 Rehabilitation S-21 CRF None - - - - - 50,000 - - - - - 50,000 91 Pump Station 2 R&R S-23 CRF None - - . - - 1.140,000 - - - - - 1.140,000 92 Pump Station 18 R&R S-26 CRF None - - - - - 870,000 - - - - - 870,000 93 Fume Maim PoF/CoF-Priority l S-31d CRF None - - - - - 4.987.500 - - - - - 4,987,300 94 Gravity Main Replacement-Priority 2 S-05h CRP None - - - - - - 1.902000 - - - - 1.902.000 95 Pump Station 29 R&R 0.29 CRF None - - - - - - 6.370.000 - - - - 6,370.000 96 Gravity Mains VI Reduction-Priority 2 S-02n CRP None - - • - - - - 1205,000 - - - 1.205.000 97 Gravity Main Replacement-Priority 2 ,/ S-05c CRP None - - - - - - - 1.902.000 - - - 1.902.000 98 Pump Station 14 R&R S-24 CRF None - - - - - - - 880.000 - - - 880.000 99 Pump Station 15 R&R 5-25 CRF None - - - - - - - 970,000 - - - 970.000 00 Pump Station 27 R&R S-27 CRF None - - - - - - - 2,420.000 - - - 2.420.000 01 Gravity Mains VI Reduction-Priority 2 S-02b CRF None - - - - - - - - 1.205.000 - - 1205.000 02 Gravity Main Replacernere-Priority 2 S-05d CRF None - - - - - - - - 1.902.000 - - 1902,000 03 Force Maim PoF/CoF-Priority 2 5-32a CRF None - - - - - - - - 3348.000 - - 3348.000 04 Gravity Main Replacement-Priority 2 S-05e CRF None - - - - - - • - - 1,902.000 - 1.902,000 05 Force Mains PoF/CoF-Priority 2 S-32b CRF None - - - - - - - - - 5,022.000 . 5,022.000 06 Gravity Maim I/1 Reduction-Priority 3 S-03a CRF None - - - - - - - - - - 795,600 795,600 07 Gravity Main Replacement-Priority 3 S-06a CRF None - - - - - - - - - - 752,000 752.000 08 Force Mains PoF/CoF-Priority 2 S-32e CRF None - - - - - - - - - - 3.348,000 3348000 09 Subtotal-Major Capital Projects 511.975538 $19.110.780 513,724563 $ 7.184523 S 7377.559 S 8.999300 $ 8.272,000 5 7,377,000 $ 6.455,000 $ 6.924,000 S 4.895,600 $ 102.292.062 10 TOTAL SEWER SYSTEM CAPITAL IMPROVEMENT PROGRAM 512,000.538 520,328,780 514.053.007 $ 7.242.836 5 8,766,132 5 9.665,866 S 8,563,578 5 7,945,468 5 7,023,468 S 7.492,468 S 5,464,068 S 108,546,207 Page 378 of 1707 1-It Table 1-13 City of Miami Beach,Florida Water and Sewer Rate Study Estimated Multi-Year Capital Improvement Program and Fondine Sources Neal Year Cadin:Se7 ambit's' ` ' Liar Project Trojan ' Folding Esnhilea Adl®ted Pte. De42o4ptl0s Number Number • Soat04 FIMor 2020 1021 2022 1023 2024 2025 1026 2027 2028 2029 2030 Total TOTAL WATER AND SEWER SYSTEM CAPITAL IMPROVEMENT I 11 PROGRAM $33,473,743 $33211,055 S 28,698,292 S 18.753,275 $19,973,359 $10.325,204 $16,725.445 $14,084593 S 30,582,593 $11,849,593 $ 9,821,193 S 227,498,346 FUNDING SOURCES WATER SYSTEM 112 Capital Replacement Fund Deposits CRF $ 5,997,939 $ 2,055,300 $ 1,554,907 $ 763.582 $ 3.447.234 $ - S 7.682,000 S 5.400,000 S 22,820,000 $ 3,618.000 $ 3,618,000 $ 56,956,962 113 Proceeds from Series 2017 Bonds 2017Bonds 14,830267 9.354.975 - - - - - - - - 24.185,242 114 Proceeds from Series 2022 Bonds BI - - 12.404,573 10,132.857 7,132,123 - - - - - - 29,669.554 115 User Rate Revenue REV 645,000 1.472,000 685.804 614,000 627.870 659.338 479.867 739.126 739.126 739,126 739.126 8.140.381 116 TOTAL WATER SYSTEM FUNDING SOURCES - $21.473206 $12,882,275 S 14.645284 5 11.510.439 5 11207227 $ 659.338 $ 8,161.867 $ 6.139,126 $23,559.126 S 4,357,126 $ 4.357.126 $ 118.952,139 SEWER SYSTEM 117 Capital Replacement Fund Deposits CRF S 4,068.938 S 2,861,500 S 2,924,845 $ 2,389,091 $ 2,438263 $ 8,999,500 $ 8,272,000 $ 7.377,000 5 6,455.000 $ 6,924,000 $ 4.895.600 S 57,605,736 118 Proceeds from Series 2017 Bonds 2017Bords 7.906,600 16249280 - - - - - - - - - 24.155,880 119 Proceeds fpm Series 2022 Bonds BI - - 10,795,718 4,795.432 4.939.295 - - - - - - 20,530,446 120 User Rate Revenue REV 25.000 1218,000 332.444 58,313 1,388,573 666.366 291578 568,468 568,468 568.468 568.468 6254,145 121 TOTAL SEWER SYSTEM FUNDING SOURCES $12.000,538 $20.328,780 514,053.007 1 7.242,836 $ 8.766.132 S 9.665,866 $ 8.563.578 S 7,945.468 $ 7.023,468 $ 7,492,468 $ 5.464,068 $ 108,546207 COMBINED WATER AND SEWER SYSTEM 122 Capital Replacement end Improvement Fund Deposits CRF $10.066,877 5 4.916,800 $ 4,479.752 $ 3,152.672 $ 5.885.497 S 8.999500 5 15.954.000 $12.777.000 S 29.275.000 $10,542.000 5 8513,600 0 114,562,698 123 Proceeds from Series 2017 Bands 2017Bands 22,736,867 25,604,255 - - - - - - - - - 48.341.122 124 Proceeds from Series 2022 Bonds 131 - - 23.200.292 14,928.290 12,071,418 - - - - - - 50,200,000 125 User Rate Revenue REV 670,000 2,690.000 1,018,248 672.313 2,016.443 1,325.704 771.445 1,307,593 1,307,593 1.307,593 1.307,593 14,394526 126 TOTAL WATER AND SEWER SYSTEM FUNDING SOURCES $33,473,743 $33211.055 S 28,698,292 $18,753275 5 19,973,359 $10,325,204 S 16,725,445 $14.084593 $30,582,593 5 11.849,593 S 9,821,193 S 227,498,346 • Page 379 of 1707 t-42 Table 1-14 City of Miami Beach,Florida - Water and Sewer Rate Study Water and Sewer System Projected Cash Balances and Interest EarninEs By Fund tir, ...-,.:.-.,.. - - FiecolVear tridi 9 ,!ember 30, .. .. Deeertptf6n• °p) 2020 2011 2022 . 2024 2025 2026 2027 2028 2029 2030 OPERATING FUND-425 I Beginning Balance 5 68,410,482 2 Adjustment for Open Purchase Orders - 3 Adjusted Beginning Balance $ 68,410,482 $ 67,111,155 $ 71,661,841 $ 79,999.690 $ 89,883,060 $ 97.137,524 $ 101,939.328 $ 100,416,734 S 103,037,618 $ 89.188,115 S 93.928,424 4 '1•ransfers In-Grant Reimbursement - - - - - - - - - - - 5 Transfers Out-Capital Improvement Program-Water - - - - - - - - - - - 6 Transfers Out-Capital Improvement Program-Sewer - - - - - - - - - - - 7 Transfers Out-Renewal and Replacement Fund-Water - - - - - - - - - - - 8 Transfers Out-Renewal and Replacement Fund-Sewer - - - - - - - - - - - 9 Transfers ln/(Oat)-Surplus/(Deticiency)-Water (3.563.517) 688,131 2,872,293 3,935,489 2,210,653 6,013.079 (1,508,867) 1.076,559 (16.387,305) 2,695.927 2.657,923 10 Transfers In/(Out)-Surplus/(Deficiency)-Sewer 2,264,190 1862,555 5,465.555 5.947.882 5,043,811 (1211,275) (13.727) 1.544,324 2,537,803 2,044.383 4.161,135 II Interest Rate (S) 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 12 Interest Income 684,105 671.112 716,618 799,997 898,831 971,375 1,019,393 1.004,167 1,030,376 891,881 939,284 Recognition of Interest Earnings 13 in Revenue Requirements 684,105 671.112 716.618 799,997 898,831 971375 1,019,393 1,004,167 1,030,376 891,881 939,284 14 Ending Balance S 67,111,155 $ 71,661,841 $ 79,999,690 $ 89,883,060 $ 97,137,524 $ 101,939.328 $ 100.416.734 $ 103,037,618 $ 89,188,115 $ 93,928,424 S 100,747,482 Days of Rate Revenue(Target=120 Days) 15 With Rate Stabilization Fund Balance 315 323 337 356 376 386 377 383 329 344 366 16 Without Rate Stabilization Fund Balance 315 323 337 356 376 386 377 383 329 344 366 Days of Operation&Maintenance Expenses 17 With Rate Stabilization Fund Balance 385 407 438 475 508 527 514 523 448 467 496 18 Without Rate Stabilization Fund Balance 385 407 438 475 508 527 514 523 448 467 496 19 Percent Allocable to Water System 40.26% 40.58% 41.26% 41.82% 42.29% 42.77% 42.77% 42.77% 42.77% 42.77% 42.77% 20 Interest Income Allocable to Water System UW $ 275.397 S 272.331 5 295.649 $ 334,552 $ 380.157 $ 415.473 $ 436.011 $ 429,499 $ 440,709 $ 381.472 $ 401,747 21 Interest Income Allocable to Sewer System US 408.707 398.781 420,969 465.445 518,673 555.903 583,382 574.669 589,667 510,409 537,537 CAPITAL REPLACEMENT AND IMPROVEMENT FUND-WATER 22 Beginning Balance $ 3,787,959 23 Adjustment For Open Purchase Orders - 24 Adjusted Beginning Balance $ 3,787,959 5 2,149,000 $ 2.149,000 $ 2,149,000 $ 2,149,000 $ 2,149,000 $ 2,149,000 $ 2,149,000 $ 2,149.000 $ 2.149.000 $ 2,149,000 25 Transfers In 4,358,980 2.055.300 1.554,907 763,582 3,447.234 - 7,682,000 5,400,000 22,820,000 3,618,000 3,618,000 26 Transfers Out-Capital Improvement Program 5,997,939 2,055300 1.554,907 763,582 3,447,234 - 7,682,000 5,400,000 22,820,000 3,618,000 3,618,000 27 Interest Rate (S) 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 28 Interest Income 29,685 21,490 21,490 21,490 21,490 21,490 21,490 21,490 21,490 21,490 21.490 Recognition of Interest Earnings 29 in Revenue Requirements 29,685 21,490 21,490 21,490 21.490 21.490 21.490 21,490 21,490 21,490 21,490 30 Ending Balance $ 2,149,000 $ 2,149,000 5 2.149,000 $ 2.149,000 $ 2,149,000 $ 2,149,000 $ 2.149.000 $ 2,149,000 5 2.149,000 $ 2,149,000 $ 2,149,000 31 Percent Allocable to Water System 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 32 Interest Income Allocable to Water System UW $ 29,685 $ 21.490 5 21,490 $ 21,490 $ 21,490 $ 21,490 $ 21.490 $ 21,490 $ 21,490 $ 21.490 $ 21.490 33 Interest Income Allocable to Sewer System US 0 0 0 0 0 0 0 0 0 0 0 Page 380 of 1707 1-43 Table 1-14 City of Miami Beach,Florida Water and Sewer Rate Study Water and Sewer System Projected Cash Balances and Interest Earnines Be Fund . , • . , r,_ , "' ,.h';' siieC aerEndl ±'5a•lem r30. 'd, Datcriptlon 111 2020 2021 '2022 2023 2024' 2025 2026 2027 2028 2029 2030 CAPITAL REPLACEMENT AND IMPROVEMENT FUND-SEWER 34 Beginning Balance 5 5.621,573 35 Adjustment For Open Purchase Orders - 36 Adjusted Beginning Balance $ .5,621,573 $ 4,028,000 $ 4,028,000 S 4,028,000 $ 4,028,000 $ 4,028,000 $ 4,028,000 S 4,028,000 $ 4,028,000 $ 4.028,000 S 4,028,000 37 Transfers In 2,475,365 2,861,500 2,924,845 2,389,091 2,438,263 8,999,500 8,272,000 7.377,000 6.455.000 6.924,000 4,895,600 38 Transfers Out-Capital Improvement Program 4.068,938 2,861,500 2,924,845 2,389,091 2,438,263 8,999,500 8,272,000 7.377,000 6,455,000 6,924,000 4,895,600 39 Interest Rate (S) 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 40 Interest Income 48.248 40,280 40.280 40,280 40,280 40,280 40,280 40,280 40,280 40.280 40,280 Recognition of Interest Earnings 41 in Revenue Requirements 48,248 40,280 40,280 40,280 40,280 40,280 40,280 40,280 40,280 40,280 40,280 42 Ending Balance $4,028,000 54,028.000 $4,028,000 $4,028,000 $4,028,000 $4,028,000 $4,028,000 $4,028,000 $4,028,000 $4,028,000 $4,028,000 43 Percent Allocable to Water System 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% - 0.00% 0.00% 0.00% 0.00% 0.00% 44 Interest Income Allocable to Water System UW $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - - $ - 45 Interest Income Allocable to Sewer System US 48.248 40.280 40,280 40.280 40,280 40,280 40,280 40,280 40.280 40,280 40,280 CUSTOMER DEPOSITS 46 Beginning Balance $ 6,838,350 S 6,838,350 5 6,838.350 $ 6,838,350 5 6.838,350 $ 6,838,350 $ 6.838,350 $ 6.838,350 $ 6,838,350 $ 6,838,350 5 6,838.350 47 Transfers In 0 0 0 0 0 0 0 0 0 0 0 48 Transfers Out 0 0 0 0 0 0 0 0 0 0 0 49 Interest Rate 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 50 Interest Income 0 0 0 0 0 0 0 0 0 0 0 Recognition of Interest Earnings 51 in Revenue Requirements 0 0 0 0 0 0 0 0 0 0 0 52 Ending Balance 6.838,350 6,838.350 6,838,350 6,838,350 6,838,350 6,838,350 6,838.350 6,838,350 6.838,350 6,838,350 6,838,350 53 Percent Allocable to Water System 58.39% 58.39% 58.39% 58.39% 58.39% 58.39% 58.39% 58.39% 58.39% 58.39% 5839% 54 Interest Income Allocable to Water System RW $ - $ - $ - $ - $ - $ - $ - S - $ - $ - S - 55 Interest Income Allocable to Sewer System RS - - - - - - - - - - - SINKING FUND 56 Sinking Fund Deposit $ 11,727338 $ 7339.800 $ 8,898,367 S 12,036.600 $ 12.030,700 5 13,516,450 $ 13,519,950 $ 12.029,400 $ 12,027,750 $ 12,030,750 $ 12,032.650 57 Average Balance 2,931,835 1,834.950 2224,592 3,009,150 3,007,675 3379,113 3,379.988 3.007,350 3,006,938 3,007,688 3.008,163 58 Interest Rate (S) 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 59 Interest Income 29.318 18,350 22,246 30,092 30,077 33,791 33,800 30.074 30,069 30,077 30.082 Recognition of Interest Earnings 60 in Revenue Requirements 29.318 18.350 22,246 30,092 30.077 33,791 33,800 30,074 30.069 30,077 30,082 61 Percent Allocable to Water System 41.00% 41.00% 43.98% 44.81% 44.81% 44.39% 44.39% 44.81% 44.81% 44.81% 44.81% 62 Interest Income Allocable to Water System UW $ 12,021 $ 7.523 $ 9,783 $ 13,484 S 13,478 $ 15,001 $ 15,004 $ 13,476 $ 13.475 $ 13,478 5 13.480 63 Interest Income Allocable to Sewer System US 17,298 10,826 12.463 16,608 16,599 18,791 18,796 16,597 16,595 16,599 16,602 Page 381 of 1707 • 1-44 Table 1-14 City of Miami Beach,Florida Water and Sewer Rate Study Water and Sewer System Projected('ash Balances and Interest Earnings By Fund ., . I Wile L+nd1n 5:tetH,er'v . ,flo benNpttoa (it t . • . 2021 2022 2023 2025 2026 . 2027 .3028. 2029 2030 CONSTRUCTION FUND 64 Balance as of September 30,2019 5 48.341.122 65 Adjustment For Open Purchase Orders - - 66 Adjusted Beginning Balance $ 48,341,122 $ 25,604,255 $ - $ 26,999.708 $ 12.071,418 $ 0 $ 0 $ 0 S 0 $ 0 S 0 67 Transfers In - - 50,200,000 - - - - - - - - 68 Transfers Out-Capital Improvement Program 22,736,867 25,604,255 23,200,292 14,9211,290 12,071,418 - - - - - - 69 Interest Rate (C) 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 70 Interest Income - - - - - - - - - - Recognition of Interest Earnings 71 in Revenue Requirements - - - - - - - - - - - 72 Ending Balance $ 25,604,255 $ - S 26,999,708 $ 12,071,418 $ 0 $ 0 $ 0 S 0 $ 0 $ 0 $ 0 73 Percent Allocable to Water System 59.10% 59.10% 59.10% 59.10% 59.10% 59.10% 59.10% 59.10% 59.10% 59.10% 59.10% 74 Interest Income Allocable to Water System RW $ - $ - $ - $ - $ - $ - $ - $ - $ - 5 - $ 75 Interest Income Allocable to Sewer System RS - - - - - - - - - - - WATER IMPACT FEE FUND 76 Beginning Balance $ 411.881 77 Adjustment For Open Purchase Orders - 78 Adjusted Beginning Balance $ 411.881 $ 0 $ 0 5 0 $ 0 5 0 5 0 $ 0 $ 0 $ 0 S 0 79 Transfers In - - - - - - - - - - - 80 Transfers In-Grant Funding - - - - - - - - - - - 81 Transfers Out-Capital Improvement Program - - - - - - - - - • 82 Transfers Out-Payment of City Debt Service 411,881 - - - - - - - - - - 83 Transfers Out-Developer Reimbursement - - - - - - - - - - - 84 Interest Rate 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 85 Interest income - - - - - - - - - - Recognition of Interest Earnings 86 in Revenue Requirements - - - - - - - - - - - 87 Ending Balance 5 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 88 Percent Allocable to Water System 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 89 Interest Income Allocable to Water System RW S - $ - $ - S - $ - S - $ - $ - S - $ - 5 - 90 Interest Income Allocable to Sewer System RS - - - - - - - - - - - SEWER IMPACT FEE FUND 91 Beginning Balance $ 624.464 92 Adjustment For Open Purchase Orders - , 93 Adjusted Beginning Balance $ 624,464 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 5 0 $ 0 $ 0 S 0 94 Transfers In - - - - - - - - - - - 95 Transfers Out-Capital Improvement Program - - - - - - - - - - - 96 Transfers Out-Payment of City Debt Service 624,464 - - - - - - - - - - 97 Transfers Out-Developer Reimbursement - - - - - - - - - - - 98 Interest Rate 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 99 Interest Income - - - - - - - - - - - Recognition of Interest Earnings 100 in Revenue Requirements - - - - - - - - - - - 101 Ending Balance $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 102 Percent Allocable to Water System 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 103 Interest Income Allocable to Water System RW $ - S - $ - $ - $ - $ - $ - $ - $ - $ - $ - 104 Interest Income Allocable to Sewer System RS - - - - - - - - - - - Page 382 of 1707 1-45 Table 1-14 City of Miami Beach,Florida Water and Sewer Rate Study Water and Sewer System Projected Cash Balances and Interest Earnines By Fund Oittartear tndln.Si.t'unher30, An.!19hs rF{t km - {1{ 'I `"'2021 20 2 2823 - 2024 2029 2026 2027 2028 2029 2030 INTEREST INCOME Unrestricted 105 Water System UW $ 317.103 $ 301.344 $ 326,922 $ 369,526 $ 415,125 $ 451,963 $ 472,505 $ 464.465 $ 475.674 5 416,440 $ 436,717 106 Sewer System US 474,253 449,887 473,712 522,333 575,552 614,973 642,458 631,546 646,542 567,288 594,419 107 Total S 791,356 $ 751,231 $ 800,634 $ 891,858 $ 990,677 $ 1,066,936 $ 1,114.963 $ 1,096,011 S 1,122,216 S 983,728 $ 1,031,136 Restricted 108 Water System RW $ - $ - $ - $ - $ - $ - $ - $ - S - $ - $ - - 109 Sewer System RS - - - - - - - - - - 110 Total $ - S - $ - $ - $ - $ - $ - $ - $ - $ - $ - TOTAL INTEREST INCOME Ill Water System $ 317,103 S 30h344 $ 326.922 $ 369,526 $ 415,125 $ 451,963 $ 472,505 $ 464,465 $ 475,674 $ 416,440 $. 436,717 112 Sewer System 474,253 449,887 473,712 522,333 575,552 614,973 642,458 631,546 646,542 567,288 594,419 113 Total $ 791,356 $ 751,231 $ 800,634 $ 891,858 S 990,677 $ 1,066,936 $ 1,114,963 $ 1,096,011 $ 1,122,216 $ 983,728 $ 1,031,136 1oumot s: 111 11W ar US -Interest earnings urn strieted and;resumed to he a-ailahle In meet system expenditure requirements. RW or ILS Interest earnings restricted and assun ed to not be available in meet system expenditure requirements. Page 383 of 1707 1-46 Table 1-15 City of Miami Beach,Florida Water and Sewer Rate Study Water and Sewer System Projected Other Operating Revenues "venue • Escalation,, • nrE ' .',,..• Code Description Reference , • .,.2021 2022 2023' . 2024 • 2025 2026 2027 2028 2029 2030 WATER SYSTEM 1 343320.0000 Firelines Constant $ 391,000 $ 391,000 $ 391,000 $ 391,000 $ 391,000 $ 391,000 $ 391.000 $ 391,000 $ 391,000 $ 391,000 $ 391,000 2 34340.0000 Water Tapping Constant 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 3 343341.0000 Sub-Meter Service Constant 1,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 4 343900.0000 Utility Service Constant 16,000 16,000 16,000 16,000 16,000 16,000 16,000 16,000 16,000 16,000 16,000 5 36994.0000 Utility Penalties Constant 298,905 298,905 298,905 298,905 298,905 298,905 298,905 298,905 298,905 298,905 298,905 6 369997.0000 Miscellaneous Water Constant 10,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 7 36999.0000 Miscellaneous Constant 17,000 21,000 21,000 21,000 21,000 21,000 21,000 21,000 21,000 21,000 21,000 8 Total Other Water Operating Revenue $ 783,905 $ 786,905 $ 786,905 $ 786,905 $ 786,905 $ 786,905 $ 786,905 $ 786,905 $ 786,905 $ 786,905 $ 786,905 SEWER SYSTEM 9 343520.0000 Sewer Connection Fees Constant $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 10 343550.0000 Sewer Fees-Outside Constant 3,068,000 3,068,000 3,068,000 3,068,000 3,068,000 3,068,000 3,068,000 3,068,000 3,068,000 3,068,000 3,068,000 11 343900.0000 Utility Service Constant 16,000 16,000 16,000 16,000 16,000 16,000 16,000 16,000 16.000 16,000 16,000 12 36994.0000 Utility Penalties Constant 443,595 443,595 443,595 443,595 443,595 443,595 443,595 443,595 443.595 443,595 443,595 13 369998.0000 Misceallaneous Sewer Constant 30,000 41,000 41,000 41,000 41,000 41,000 41,000 41,000 41,000 41,000 41,000 14 36999.0000 Miscellaneous Constant 17,000 21,000 21,000 21,000 21,000 21,000 21,000 21,000 21,000 21,000 21,000 15 Total Other Wastewater Operating Revenue $ 3,584,595 $ 3,599,595 $ 3,599,595 $ 3599,595 $ 3,599,595 $ 3,599,595 $ 3.599,595 $ 3,599,595 $ 3,599.595 $ 3,599,595 $ 3,599,595 16 Total Other Operating Revenue $ 4,368,500 $ 4,386,500 $ 4,386,500 $ 4,386,500 $ 4,386,500 $ 4,386,500 $ 4,386,500 $ 4,386,500 $ 4,386,500 $ 4,386,500 $ 4,386,500 Page 384 of 1707 1-47 Table 1-16 City of Miami Beach,Florida Water and Sewer Rate Study Water and Sewer System Projected Operating Results and Debt Service Coverage . Y8i1 'c.`;ii:'.,. ., •• . ,' ...,. - ,. „ #1•,Y I iciNfdln.Se',temberte ' •=lio Deserlplloa 2020 2021 2022 2023 ' 2024 •' 2025 ,2026 2021 2010 2029 2030 System Revenue User Rate Revenue I Water User Rate Revenue $ 31,337,902 $ 32,015,679 $ 33,380,467 $ 34,745,255 $ 34,745,255 $ 34,745,255 $ 34,745,255 $ 34,745,255 $ 34,745,255 $ 34,745,255 $ 34,745,255 2 Sewer User Rate Revenue 46,507,450 47,537,926 49,367,941 51,197,957 51,197,957 51,197,957 51,197,957 51,197,957 51,197,957 51,197,957 51,197,957 Water System 3 Rate Adjustment(%) 0.00% 3.50% 3.50% 3.50% 3.50% 3.50% 0.82% 0.83% 0.81% 0.83% 0.85% Sewer System 4 Rate Adjustment(%) 0.00% 1.61% 1.50% 1.50% 1.50% 1.50% 0.82% 0.83% 0.81% 0.83% 0.85% 5 Cumulative Additional User Rate Adjustment Revenue-Water $ - $ 840,400 $ 2,377,500 $ 3.777,400 5 5,125.700 $ 6,521,200 $ 6,857,900 $ 7,204,700 $ 7,546,600 $ 7,898,800 $ 8,262,000 6 Cumulative Additional User Rate Adjustment Revenue-Sewer - 574,000 1,547,200 2,396,600 3,200,600 4,016,600 4,467,000 4,931,000 5,388,400 5,859,800 6,345,700 7 Total User Rate Revenue $ 77,845,352 $ 80,968,005 $ 86,673,109 $ 92,117,213 $ 94,269,513 $ 96,481,013 $ 97,268,113 $ 98,078,913 $ 98,878,213 $ 99,701,813 $ 100,550,913 8 Other Operating Revenue $ 4,368,500 $ 4,386,500 $ 4,386,500 5 4,386,500 5 4,386,500 $ 4,386,500 $ 4,386,500 $ 4,386,500 $ 4,386,500 5 4,386,500 $ 4,386,500 9 Unrestricted Interest Income 791,356 751,231 800,634 891,858 990,677 1,066,936 1,114,963 1,096,011 1,122,216 983,728 1,031,136 10 Total System Revenue $ 83,005,208 $ 86,105,736 $ 91,860,243 $ 97,395,571 $ 99,646,690 5 101,934,449 $ 102,769,576 $ 103,561,423 $ 104,386,928 $ 105,072.041 $ 105,968,548 Current Expenses for Debt Service Coverage Purposes 11 Personal Services 5 8.173.000 S 8,079,000 $ 8,336,510 $ 8,602,502 5 8,877,269 $ 9,161,114 $ 9,454,350 $ 9.757,303 $ 10,070,311 $ 10.393,724 S 10,727,905 12 Operating Supplies 208.300 238,300 244,904 251,473 257.995 264,461 271,101 277,922 284,674 291.607 298,726 13 Contractual Services 44,668,670 45.568,310 47,487,442 49,400,503 49,628,838 49,864,271 50,018,024 50,177,125 50,339,495 50,507,544 50,681,503 14 Utilities 956,000 958,000 1,010,747 1,066,075 1,106,581 1,148,520 1,192,082 1,237,332 1,284,190 1,332,864 1,383,425 15 Internal Charges 3,222,000 3,250,000 3,347,500 3,447,925 3,551,363 3,657,904 3,767,641 3,880,670 3,997,090 4,117,003 4,240,513 16 Administrative Fees 2,400,000 2,400,000 2,472,000 2,546,160 2,622,545 2,701,221 2,782,258 2,865,726 2,951,697 3,040,248 3,131,456 17 Other Operating 3,247,227 3,071,840 3,183,715 3,292,551 3,371,345 3,449,623 3,517,204 3,586.111 3,654,020 3,723,530 3,786,987 18 Contingency 3,212,000 3,036,000 3,036,000 3,036,000 3,036,000 3,036,000 3,036,000 3,036,000 3,036,000 3,036,000 3,036,000 19 Less Administrative Fees,Depreciation,and Amortization (2,400,000) (2,400,000) (2,472,000) (2,546,160) (2,622,545) (2,701,221) (2,782,258) (2,865,726) (2,951,697) (3,040,248) (3,131,456) 20 Total Current Expenses for Debt Service Coverage Purposes $ 63,687,197 $ 64,201,450 $ 66,646,818 $ 69,097,029 $ 69,829,392 $ 70,581,891 $ 71,256,401 $ 71,952,463 $ 72,665,781 $ 73,402,272 $ 74,155,059 21 Operating Ratio 77% 75% 73% 71% 70% 69% 69% 69% 70% 70% 70% 22 Net Revenues Available for Debt Service $ 19,318,011' $ 21,904,286 $ 25,213,425 $ 28,298,542 5 29,817,298 $ 31,352,558 $ 31,513,174 $ 31.608,960 5 31,721,147 $ 31,669,768 $ 31,813,490 Senior Lien Indebtedness 23 Water and Sewer Revenue Refunding Bonds,Taxable Series 20091-IA $ 3,021,538 $ - $ - $ - $ - $ - $ - $ - $ - $ - S - 24 Water and Sewer Revenue Refunding Bonds,Taxable Series 20091-1B 450.000 - - - - - - - - - - 25 Water and Sewer Revenue Refunding Bonds,Taxable Series 2009.1-1C 1,350.000 - - - - - - - - - - 26 Water and Sewer Revenue and Revenue Refunding Bonds,Series 2017 6,905,800 6,809,400 6,639,400 6,639,150 6,640,400 10,222,900 10,227,400 8,658,650 8,654,650 8,655,400 8,655,150 27 Water and Sewer Revenue Refunding Bonds,Series 2020 - 530,400 795,600 2,864,700 2,857,550 760,800 759,800 838,000 840,350 842,600 844,750 28 Series 2022 Bonds - - 1,463,367 2,532,750 2,532,750 2,532,750 2,532,750 2,532,750 2,532,750 2,532,750 2,532,750 29 Total Annual Debt Service on Senior Lien Indebtedness $ 11.727,338 $ 7,339,800 $ 8,898,367 $ 12,036,600 5 12,030,700 $ 13,516,450 $ 13,519,950 $ 12,029,400 $ 12,027,750 $ 12,030,750 $ 12,032,650 Page 385 of 1707 1-48 Table 1-16 City of Miami Beach,Florida Water and Sewer Rate Study Water and Sewer System I'roiected Operating Results and Debt Service Coverage . ... ., ' .Flecal Yiielrtidlp• ' ember 30 ".NJ Description '-0. . ' 2021 .• 2022 • 2023 2024 2025 2026 • 2027 2028 2029 2030 • SENIOR LIEN BONDS DEBT SERVICE COVERAGE: Net Revenues Debt Service Coverage 30 Net Revenues Available for Debt Service $ 19,318,011 $ 21,904,286 $ 25,213,425 $ 28,298,542 $ 29,817,298 $ 31,352,558 $ 31,513.174 $ 31,608,960 $ 31,721,147 $ 31,669,768 $ 31,813,490 31 Total Annual Debt Service on Senior Lien Indebtedness $ 11.727,338 $ 7,339,800 $ 8,898,367 $ 12,036,600 $ 12,030.700 $ 13.516,450 5 13,519,950 $ 12,029,400 $ 12,027,750 $ 12,030,750 $ 12,032,650 32 Debt Service Coverage(110%Required) 165% 298% 283% 235% 248% 232% 233% 263% 264% 263% 264% ALL-1N/OVERALL DEBT SERVICE COVERAGE: Net Revenues Debt Service Coverage 33 Gross Revenues $ 83,005,208 $ 86,105,736 5 91,860,243 $ 97,395,571 $ 99,646,690 $ 101,934,449 $ 102,769.576 $ 103,561,423 $ 104,386,928 $ 105,072,041 $ 105,968,548 34 Less All Operating Expenses 66,109,197 66,608,450 69,126,028 71,650,615 72,459,585 73,290,991 74,046,774 74,826,547 75,626,087 76,451,388 77,295,648 35 Net Revenues $ 16,896,011 $ 19,497,286 5 22,734,215 5 25,744,956 $ 27,187,104 $ 28,643,458 $ 28,722,801 $ 28,734,877 $ 28,760,841 $ 28,620.653 S 28,672,901 36 Senior and Junior Lien Indebtedness $ 11.727338 5 7,339,800 $ 8,898,367 $ 12,036.600 $ 12,030,700 $ 13,516,450 $ 13,519,950 $ 12,029,400 $ 12,027,750 $ 12,030.750 $ 12,032,650 37 Debt Service Coverage(200%Target) 144% 266% 255% 214% 226% 212% 212% 239% 239% 238% 238% Net Revenues After Payment of Debt Service and Required Transfers- 38 Available for Other System Purposes $ 5,168,673 $ 12,157.486 $ 13,835,849 $ 13,708,356 S 15,156,404 $ 15,127,008 $ 15,202,851 $ 16,705,477 $ 16,733,091 $ 16,589,903 $ 16,640,251 Page 386 of 1707 . 1-49 • Table 1-17 City of Miami Beach,Florida Water and Sewer Rate Study Summary of Projected Sources and Uses of Funds ,, s ,1)eacrllrtlon 2020 '2021 '' 2022 ' 2023 2024 2025 .2026 2027 2028 ' ' 2029 2030 I Unrestricted Cash Balances from Below $ 73,288,155 $ 77,838,841 $ 86,176,690 $ 96,060,060 $103,314,524 $108,116,328 $106,593,734 $109,214,618 $ 95,365,115 $100,105,424 $106,924,482 OPERATING FUND-425 AND RATE STABILIZATION FUND Sources of Funds 2 Water and Wastewater User Rate Revenue $ 77,845,352 $ 80,968,005 $ 86,673,109 $ 92,117,213 $ 94,269,513 $ 96,481,013 $ 97,268,113 $ 98,078,913 $ 98,878,213 $ 99,701,813 $100,550,913 3 Other Operating Revenue 4,368,500 4,386,500 4,386,500 4,386,500 4,386,500 4,386,500 4,386,500 4,386,500 4,386,500 4,386,500 4,386,500 4 Unrestricted Interest Income 791,356 751,231 800,634 891,858 990,677 1,066,936 1,114,963 1,096,011 1,122,216 983,728 1,031,136 5 Impact Fees Used to Pay City Debt Service 1,036,345 - - - - - - - - - 6 Available Cash Balances 68,410,482 67,111,155 71,661,841 79,999,690 89,883,060 97,137,524 101,939,328 100,416,734 103,037,618 89,188,115 93,928,424 7 Total Sources of Funds S 152,452,035 $153,216,891 $163,522,084 S 177,395,260 5 189,529,750 $199,071,973 5 204,708,903 5 203,978,158 $207,424,546 $194,260,156 $199,896,973 Uses of Funds 8 Operating Expenses: $ 66,109,197 $ 66,608,450 $ 69,126,028 $ 71,650,615 $ 72,459,585 $ 73,290,991 $ 74,046,774 $ 74,826,547 $ 75,626,087 $ 76,451,388 $ 77,295,648 9 City Debt Service 11,727,338 7,339,800 8,898,367 12,036,600 12,030,700 13,516,450 13,519,950 12,029,400 12,027,750 12,030,750 12,032,650 10 Capital Funded from Rates 670,000 2,690,000 1,018,248 672,313 2,016,443 1,325,704 771,445 1,307,593 1,307,593 1,307,593 1,307,593 11 Transfers to Capital Replacement Funds 6,834,345 4,916,800 4,479,752 3,152,672 5,885,497 8,999,500 15,954,000 12,777,000 29,275,000 10,542,000 8,513,600 12 Total Uses of Funds $ 85,340,880 $ 81,555,050 $ 83,522,394 $ 87,512,201 $ 92,392,226 $ 97,132,645 $104,292,169 $100,940,540 $118,236,431 $100,331,731 $ 99,149,491 13 Ending Cash Balances $ 67,111,155 $ 71,661,841 $ 79,999,690 $ 89,883,060 $ 97,137,524 $101,939,328 $100,416,734 $103,037,618 $ 89,188,115 $ 93,928,424 $100,747,482 14 Total Uses of Funds and Ending Cash Balances $152,452,035 S 153,216,891 $163,522,084 $177,395,260 $189,529,750 $199,071,973 $204,708,903 S 203,978,158 $207,424,546 $194,260,156 $199,896,973 CAPITAL REPLACEMENT AND IMPROVEMENT FUNDS(COMBINED WATER AND WASTEWATER) Sources of Funds 15 Available Cash Balances $ 9,409,532 $ 6,177,000 $ 6,177,000 $ 6,177,000 $ 6,177,000 $ 6,177,000 $ 6,177,000 $ 6,177,000 $ 6,177,000 $ 6,177,000 $ 6,177,000 16 Transfers In-Operations 6,834,345 4,916,800 4,479,752 3,152,672 5,885,497 8,999,500 15,954,000 12,777,000 29,275,000 10,542,000 8,513,600 17 Interest Income 77,933 61,770 61,770 61,770 61,770 61,770 61,770 61,770 61,770 61,770 61,770 18 Total Sources of Funds S 16,321,809 $ 11,155,570 $ 10,718,522 $ 9,391,442 5 12,124,267 S 15,238,270 $ 22,192,770 $ 19,015,770 $ 35,513,770 $ 16,780,770 5 14,752,370 Uses of Funds 19 Capital Projects $ 10,066,877 $ 4,916,800 $ 4,479,752 $ 3,152,672 $ 5,885,497 $ 8,999,500 $ 15,954,000 $ 12,777,000 $ 29,275,000 $ 10,542,000 $ 8,513,600 20 Interest Income to Fund Operations 77,933 61,770 61,770 61,770 61,770 61,770 61,770 61,770 61,770 61,770 61,770 21 Total Uses of Funds $ 10,144,809 $ 4,978,570 $ 4,541,522 $ 3,214,442 $ 5,947,267 $ 9,061,270 $ 16,015,770 $ 12,838,770 $ 29,336,770 $ 10,603,770 $ 8,575,370 22 Ending Cash Balances $ 6,177,000 $ 6,177,000 $ 6,177,000 $ 6,177,000 $ 6,177,000 $ 6,177,000 $ 6,177,000 $ 6,177,000 $ 6,177,000 $ 6,177,000 $ 6,177,000 23 Total Uses of Funds and Ending Cash Balances S 16,321,809 $ 11,155,570 $ 10,718,522 $ 9,391,442 $ 12,124,267 $ 15,238,270 S 22,192,770 $ 19,015,770 $ 35,513,770 $ 16,780,770 $ 14,752,370 Page 387 of 1707 1-50 Table 1-17 City of Miami Beach,Florida Water and Sewer Rate Study Summary of Protected Sources and Uses of Funds IFiscal Year -ndih_Se tentber 30',, • .. .Dracrllit4on 2020 I 1 2022 2023 2024 2028 2026 2027 2028 2029 2030 WATER IMPACT FEE FUND Sources of Funds 24 Available Cash Balances $ 411,881 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 25 Transfers In-Water Impact Fee Collections - - - - - - - - - - - 26 Interest Income - - - - - - - - - - - 27 Total Sources of Funds $ 411,881 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Uses of Funds 28 Capital Projects $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 29 Payment of City Debt Service 411,881 - - - - - - - - - - 30 Total Uses of Funds $ 411,881 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 31 Ending Cash Balances $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 32 Total Uses of Funds and Ending Cash Balances $ 411,881 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 SEWER IMPACT FEE FUND Sources of Funds 33 Available Cash Balances $ 624,464 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 34 Transfers In-Wastewater Impact Fee Collections - - - - - - - - - - - 35 Interest Income - - - - - - - - - - - 36 Total Sources of Funds $ 624,464 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Uses of Funds 37 Capital Projects S - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 38 Payment of Debt Service 624,464 - - - - - - - - - - 39 Transfers Out-Developer Reimbursement - - - - - - - - - - - 40 Total Uses of Funds $ 624,464 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 41 Ending Cash Balances $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 42 Total Uses of Funds and Ending Cash Balances $ 624,464 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Page 388 of 1707 1-51 • ' - . . .......- .. , .; ri;'''.'•.;:' ' -....-:'7•-.-::'•..q4.;-.;4",4:;...x. ' '..- •-' ',•1'!'-.',:,11.- r.'L.....' , , • , „ • :. .-,,f...,-,:.,r..::.%.,:,.*.• . ..,...:-.:....' .. • -'s.• ''.;:...:.:.•.-'4.! ...',1,,,;•.'..1j'..!:;fe:',2.,74:.i.:Pti,..5...`rNi.',,,,k.*P,-i.:-:::T47.-7.!#47;... ... -:1"'i...'f... -,.41:k1W.;,•71-1[FAq::!.-'.1::::: ::',,,-...,..,".::-.-''..-1. .. ..." ' .!. -4 ,-In',4.,A.=".. ' .744.7.''''''''','-.''ZZ.,'"' ' :',...--,...'''-•'' "'' F. • ..;':-.''. '',.. • •-'1;•'-;..,..". ,'.?.t"•u,'-'1:41q.“,../4!•-,-..F„.!;?...IF:%7•3i.-„,. ' :. • '-'.:- . . -,.. ...:'.',.:4';':::-7,•-...:' c..',...:' ,C*;',"1-T--•;',..,i't's_47,40.'07iY.,:".::',..'%:'•'It'A. . * . - !..7...=..;::',':`,..:1%.,•,,:...- ';:?•'-"t.,..-r.T,,7•1:;-: •. .r:7.-.11-,.'..4.'...4..7--:...'";'•.'.. • . .:. .. :, ...7..1.....-:,`::- .:'" .,...-„--,r;...;;;;,,,,,t.. ,,..`.7.?;?'-.:.4- •-% ,f",.'''!;".:-.'"..**'•••".,''''..;..".•..... ' . . ' • .''''-',..•=..,:`'. ;=tq.-5j' -'-r.''ff?,:.1'.4..Act-Iffik!'...''',:"4;•1'..:'..,:'L...:-:.'' ...•...........c•• . ' 47.i!if.',;.4,- -'-',474;ki,:z..*--q!.•-;,r;:4:!;:!-!.:,•'-,'.. •• . -• .•• • - ....:••-'.:-_ .• .. ..,..i'•-•,:,•••:..;•t.r;Tr.1:;.;....;R:tf.m--•:;=,•;-...,•„,-7-„,i,..,;•,-•-•,...75-..:;;;;•,...,...:i.•;-:-P.:••,.•.;•• . • ,-.;'ri.'•:Vi'''.;'•;.'!1•-'4--':';-;•Y'';itrr-••4',#:17t..Wftt'.?.;';'4.-'-!:-:',..;-,•:,.."'....:'-•' ' • • , ,••••-•,, --.-r..;; 7..--,!!'....-,'.-/iifr.L.k.,,,,a.t'•to_kikui-411,-;71!T:: ::•';'•:•;••1;;,•7•••T.,,.'.1.i.t.. •.'• '•-• . • . ''.,:;--'. ,4, ,:,..C.:ikv--..4.F:,--TA 41'grei....T.,;,5•;',•,:" .,t• -..'...'• ,'.-.;...:. .' ' ' •.:.•-•::''''':;•-'• •46:Zr .:".'-' ''''.4t.'lifY:i;I:i;.7'13.'4.-'71:7.•::'.. ':.•.••.).'.: , :•'''''':• ' . . ' '.:....i._:-...1,7..i.::-J:F21,111-.Y.f'.:!•,"-1 irt-,t*.4'‘,!;;W4:7t-...:.:g-,:,. .',tYili'.....':::-:..Z',7;,, -,....... ..•' . - *..;:,;ifi-4.4,,ity,.r.,, ..r.;;-...247,-;•It.7,z-i:•;;'!:.11i•:::7.7;-;.'•.'",...• --,:•;!7--•'.::t:"'.." . . „ •• ••,,E,, -',, „.b-•, ..,:c.:447,-tf.,,..*1,..S.,!re.-tlat.e...,, .il'n!t.'„, ''''',.;,.,*--:**'*7.::::' -..'.:,..•''. " '' '' • . ' ':''': ' :t"--;'''''''''....t.i.,'.el'' ...;4t-ik..i.ir:•:-1-',*%.',.'•:..-5.1''-• •:1 i'..j, 2..": ..,-.' ' . . '1'• i-'1:';.•'.:'.:...... ..:'''.#t4.;,.,-,,,t;TF:',:',''.1''''''74-2',...,--'"'• . .:•••••• . .'' '. ' •. • ',.'''''''';'::-.'14i:''''' •.,---t-i.,.,.:'0;;t3t-f6.;t4- :!.!.'''':-.4F::7:: :...:•''.' •''.......'- _.....-.:': -'••• . 1-..,•.:fit.'•; -*7ittf.......al..;':',;;;L...',r,....:,:, 1. ..,.. - '. ' ' . , : . . , ....,i. . .,. . " • : .. , . • :. ' . SEC SECTION 2 : USER RATE DESIGN ..:....:,.:... ... -..- • ....,•,:...„.,,,,,--... • :•......,..:•:• . • • ..„._ . . . ...,......• . ....... ...::.• „„.„,„,•,...„,:„,,,,,„ :.:.....: ,...,.:,,,................................................. . . .:„,..„,:;..,...:-..„,,...,.„„,„.................................... . ...: .....•• •....,......„.„„:::,„•.„„;„................................ ...-- - • .... ..„.„.„;,,,..t,„,,...,„.,„;...,„:,,,....„,„,.,„„„.,,...4„:„, . .... .• . . • • , . .. • ... . ,.. .,..„.•:„.„.,........„.,,,,„,,,,,,„.....:„,.2,,:„...,„...,„,.„...„ . . . • .. . . .,.. . .. .... ,..:: .....:.:. . •. ,.... .:,.:.,......„....,.•:.,,;::,....„...,„...,..„„:„.„,..„„„,,„...,,,,,„„,,.4„.,,,,„,„,.,,,:,„:„,„.„. .. . . .,:,,:::.::„.:rir...: ...,:,,,,,:..,:,..,..,.,...„.::.:,,:,.............,..„.,,:..:,:„:.:,•••:.,:::..::,„,,.„",,?......,.....,..„„:.....,......,,•:.,..-.... i-.]:Tfitti,iffiaP-1017:41,:,.- . .. :.........:..,...-;,..1,,.:!:„,::;,. :..,i,,...:,,,,,.;,•,;,..,:;,!;:m.;:i:11::!.,,..;v:i,.,:lg,...........................'::::;,!7;•-:;!..,.:;•;.;)•••.,.i;:•,;.;:••i::.......-.:t . .!•,..9.-,•Ahittptv!..,..r.;?-7...-„rakr:74,.*5:41-c.., ... .•:.....•,.,.:;',.!;:,:,i;,•!:,!;:i;;•.,!?,!,;(,!;!!;i4.•;',',..,;:t;.;.,;q!!!!!!!!•!!!!!.;; ;.ii.4,-'27,:;.! !!'.;:_-•,-;;":.--..'..:i',•••Irt,-..:.;;:-?;!....:•••••:::: .111 .'•:,-.-• .litli'lit,'"-'-'-4-7,14;• ';',.;,-,i."..4:sg-T-44.34:P.: ' ..• .•,,,...'7,•,:;..•;;;•;--;;;;;;;;; ;!•,:iiiii;p.ir.'-;:si:;;;!;H!!fttF,;•:!!;::;!:;!! !!r!;F:!!.;:::!•••1.,:•!: -.•;-.•••,-;:.;-:: , ;•,.,;-...,,,,..;;;,r-r•-_,t,i,.,..,,t,..,:r.... ,.-L.., ., •._„trl.,-,.:„.„.,........,..4„,t.,...,,..„.„.,,, • - ,•!•,......,::„..!...,;!::!! ,.n.,,i4i.i,iiii .:!N!!!!i;!,:,4!:!•;Kihvti;:-;;; ;Ict-,,;;.;.;•!,!T;,;%;•;;:::-...E.,,:.,,i".;ii-:',:;',I. Y,,-',-,...i...1.0,;,,,,..,•i'-iiit4,..•.i ••:.-1/4,,. •-k3K.,-.L.21.4.--•±,,..--.,..,•;:::::,...4.....,•-7.,4,;;w....,-;;0:r, • . : :.':..:-;:'':::;t1'' '::Viii; q:31'f'-%!:;41i1.111.4t18iilq.k..1....';i1;;;',....................................................... ;!•?4,i!,,,,,_• • .4,t-t-t;A:.4:0;;:.-..r.:.q,•-*„1-4'-?;1.1 -. ,,..,;,ps,7:2s.. ..;,•,..•i.c,•_?1,1! .: . ••. .:, •....:,„;;.:„,„:;,!,-:;flifffl.:...:!!-,;ii•NR-NtilYitiikiiFii;kiiiii?guili[ il!!,-;:i7;-!,Ijir!-,i•!•;1!•;;•:41ff:i!T;iq.;g4;41 :;-441q,d,s:i•iltr***•.--4.`,fiErff,. 4.!Lt. kr':•-•;- -4•11.•.4.±*tli'• "- • .;,-;.••••:::;:;:,.:;!,;:;:,!::!%;,;11!4!!!itlisiltiF•fi;ii;.--;;;,.i!it.;;;i:te,iviqh.E! !;tifitHui!IRI;14]FiiKqi ,::•;-,;;;!*.435%,-,0•11.:„;;A44g;-i'..‘';41:&•434s.,...;•- •-,zrtc,,----*--,FI-•":--%•-:n.l'•;7s1•:';',.,'-':•c;.7.;4:•,,X;;;',.;-, • • :•.•',.f.:,:• :•;.-::,,!;,,,,,;;;•;;T:n:Ti4,;ii!Iii!g-!;;;.;!;t1;inztii;--;pliii.lim:::Iii-g4i!iire-inie:i.;P'.41'041-,iWI'",•'',•%;!' •!''',t'':-..-;;•`'IN'-44.14';',#iNeTi•il--';',..'•••'''-t•'...?•'..7.4-•:.:1";••••:;"--..,--`;',i.-';'::1'-'-':-. 1=3-'':.$1??4"/•-' .:-•:.,•.•:',;;;•7:•;;.:;.•!,;,-;!c -f.;;-.;.;NI•F'Fi,R4ligitii4likf--: R,rit-vrrigili41•Giglii,NUitilli-seiT'.;4.1:tqf!:4-..ii;;P:••Le::;,11;;,,I-CI,kr15'.,i.6•;'4':?.5-747 ;;;;i.;;';',:T..•••::': 'F-'•7::;:::''''''.. .1.•-•: ',.:;"',-*•'-a.7.1i.--';;''it'-'..1":-.;`;'4 . . .••:•.;.1;'::::!,.:.*:‘,;:!;!:.::!;;.;!'4•!.!•2!,ii!'.:4--ii:;-!':'"f;',N.16.IT4-4tihalitigilifii.lip.41j41':E4'';iiqt:-.:'.'i';..!`-:'•:.Y-:-.1Wit'A.11'45,1.1'41.0i,`!;4.74-N.:t ' :Vi1;ifAr-T:•:....?„:1•;;;'2::;•:•;;41,•i'i.2,1?•-•;-.>•'.;:tt...;:li;•-•:,:.„:.;ti•! • •, "'•;-•::- ; ,..rae::•!-fii!!r,„-,g.-Ntf-, . -.;:.• ...T.•.*.; - .......,,,:4,,,„wr:,..,,,,.1T.-,.:..k,„ , ,;:.,-• .•:!!,.,:r,-••,,-r,. ,,,,,,..,„,-,• ,,,....,:,,,, •,.....,.• .. . - .. "• ..;2;•„,:,-,..;,:.„,•-,,!::;•gr:•,;:s!. ..;.4!;;E-11;14;!i-taigiNiptioiluuet-;;144#0,tp,-1,4^..4.4,-;*,:',;71-•';•.f..0.1.-All'n!',;51•`:•-;1.p4;•Ai iF.- -iv.•'•';i'.=•;1:;',,•.'-'147'-•,•••••-;-'`'--','-`;,''' • •i-2,•.'T-F'';'''' ';‘-' . .• .., •.:: !...-.:i::,,1,-,•,',.---,.:,•;,;•.,-1?.; 5 ,1;;Iii1-40AT--',0 :k-.-47•'-'65::-;';;";',---A,- '--..c.:,•:,;.,:;;,.;7-;:.' :;;:•,-;'•••;•,;-'i-,..--.';;:-..;-'',- ';;•••`1,:, •;'z---.:•;;;'--, :-- ',.;:z:-:- •'•• '...: ••• ' ...''', .•" ::',',•''-'f'!-:•:,':;,;:2, ';'-.7T:,..T'ji4e--:;;7:4-41;4fillijiM7-'0V,''',•7 ,61Kitlif&b?z%"---74-1;11-41;-4;i,;1;:;''''?;;;:111J-,-5'4.;i.'''r,'":;'',.:1"1-.:''..i,`•,-•,'•'''''''.:....-'.4:1..:.-,1F-4.-•'";•,::.7.;''''-':;-'.....-.-;.,.f:?. •.---• - •••••.::•!„.i,:'•••'--•,.".. .,::•.:. ;:•••.:;..-t.'.•:,;:ic7.....-ik'!„.!..C47;ILUS.1'4`,..r.147,FV/ifgip;-0-ii" -• '.1:',...•!,:?:4:i'iii.-47:y-,k-it'itAil,l'.;'-,..•;i::;:•:4 ,"••.:•;;-'-;'-;;:j'.; •••••.•,••••:;•;:':::;.•! --t-,:y.,:,...:!;-,:•,.!"...:11-;i..,... .'-' ::"7",'...:•,!::,...;tii,;.':;;;;A-1.•-::.;.::-:::::1;,.. T.I..; .1.;:'.:!!:•!1;: ',.7411• IrdN-15?!...4:2:C:.:1' :.-iti:n -!--::-`- ":1::.,-AK:-:;176-?-3;'-;-7.',•:''''.-'. .-.'.:,---.7.--:::-.'4'-'. :.-::-...----'----'.,- -1-::-:','':?: .. , r,g,.- ;::v,--.c., ,„.,..-..,- r,.t.,zf,:ii],:,,,:i.-*,,.,,,,,,,:,,...,-- ., .--...„---., ......•:•', . . ,. *c.....4;,..;. :'.;., •.:.ji:•:"Act.J.12ii'''!",;iTt.;`'Iji; k1'.:;;:!'s .1i:Okil'..;&1112.4 ' Kiiv 7,14... 711,-5.-.;t.-.z-zs:".40,yx.k,•:‘,,,. ::::kpl,ii.;:::;t:.•:..'-.9-. ..yr,:s-N;:).-5e...3- :,-..,— '•.y.'---":-.77:-:;.,:!;, .--F.: .:•:.-...:-.--: .:•.:..:--;,!-- • '.i.-A'Al"41-:.b ',Af..,-''•ii,k,-4,,,,,..,•. ..;A..h•-• .0.;$-,;";'•sf-. ..,.-,T,s,.... . "V'q*:7":=175'4`.'.:'-'1---'',:,'-:-.-4;.,.i: ' ...,....: i",:' • —'•-' * ,L1;-'4,',Ii"'.';'171'"1.177;4 kit. '',.'::';',•., -'- pk' ' ..4:',.',=;.`,4t4"4H'+,i''::if.'.'.'',.,- ..:-,T1-*:&',''.;.: , '-.-.,'-`:' - _....::: •:- - 1-iSq'71'...,'Si'''.4',.1i• `iv''.-...:: 4.4k61;473/40%.,•V. 1 ...*': . ',,!;,..,,,,:':-.:;:„..P,t..4.,r,s74N;fA.T1_,.,'''''.'- ,t'.''-i?' 2.7. . J.j-*;:if-',:.-• . t?•ii,VATk6`?:*-4.J. •:.' •-•;..2 ':;,f.';-.):?"..'4,41,i:.'.1,•;;43.Q!:-:4t-Y. '-' :'.....,..,. _..,:...;w:.'1A:i•-,_:E,,;.',... 4',74r.:;%'%::;'*•5•-titii.,;'-'''.41::?•; t1,i,t,‘..W.: P:•;::,::1.;1:2•a":";',:-.i.'41.I,''. ;ii.,:'''''.'',.:;.,;>:.''''.ie.,;:ik.'..:;':*,:;":,-. ' ;.. .,--• ..,4,;,-...„...!.,z:-•:.* .1.,;;.•,-:;-4-2!.:4F4:471%.*-^e44-..•4;41!: ,-7'.:‘;'?'5."-.;;•it--.••:-;;',!!!! ;4i!;:',;1:.:;-ir.::;,.,;..-7,•S:''!.;-7•,;(ie•'•-.-...-':•4,..-;',.4--:',' ' '-;•--..--;-:-';''' z4:•••-;,•;..i.F!.::',"••';'-'t.'-; .:-,,.''.....,.i.:.::''il"..'•:„4 ::;::::..•-"'‘......-- .4I.'.:.--,.-i.:-.f,1:::',--:','-'1,Y7*:".':'-2,..,A _--:::-.'•'..- '......;,,--......, ..', ', ..... . . . . , _.„.. -,,,z.,.....„,..-,,,:-.,„,--,--.,‘:-..-.:,-,..:i,,t-.1,.--...-. ,.4 '"' .,:-.'',.....,: •-•:•, "'"' '.:.• '...,-..:i:'':'.iri.....- . .1,n. _< Water and Sewer Rate Study SECTION 2: USER RATE DESIGN User rate design involves the calculation of monthly rates and charges for each customer classification (e.g., residential, commercial, etc.). As noted in the transmittal letter of this report, developing a financial and rate plan for the System involves multiple considerations: The financial and rate plan should consider utility best management practices and should promote financial sustainability and creditworthiness. The proposed monthly user rates should be considered equitable, affordable, and competitive. The proposed rate plan should not cause "rate shock" to customers. From a best financial management practices standpoint, smaller incremental increases over time can help avoid future rate shock and large "catch up" rate increases. The proposed rates should enable the utility to perform the necessary capital improvements and operational changes to remain compliant with the regulatory requirements of the Florida Department of Environmental Protection and the Florida Department of Health. The proposed user rates should provide the System with an adequate level of revenue stability given the seasonality and cyclicality of water sales and corresponding billable sewer • flow. The City provided GovRates with detailed customer and sales information by customer classification and service type.The billing information was used to develop bill frequency analyses for the water system.These bill frequency analyses were used to develop a projection of detailed billing determinants (i.e., water usage by rate block) which, along with the customer and sales forecast, provides the basis for estimating utility rate revenues and projecting the effects of proposed rate changes. Page 390 of 1707 2-1 - °, .. Water and Sewer Rate Study t- : Design of Proposed Monthly Wates: In accordance with the rate design guidelines, customer forecast, projected net revenue requirements, and discussions with the City staff, GovRates developed the proposed water user rates shown in Table ES-1 of the executive summary of this report.The proposed monthly water rates reflect: Gradual increase of the percentage of revenue recovered through fixed/base charges. Maintenance of the relationships among customer classes consistent with those recognized in the 2016 rate study. Adjustment of the water pass-through rate applied to all billed usage based on the latest data, summarized in the following Exhibit 2-1: Exhibit 2-1: Water System Pass-Throu:h Rate for Fiscal Year 2021 Water Billed Sales (kgal) 6,295,515 Allowance for Non-Revenue Water 15.39% Projected Water Purchases (kgal) 7,441,040 Miami-Dade Wholesale Rate for Fiscal Year 2021 $1.7947 Total Purchased Water Cost $13,354,434 Adjustment for DERM(6%) $14,206,844 Cost Per 1,000 Gallons $2.26 The proposed water rates are designed to generate the water revenue amounts needed during the Forecast Period. In accordance with the rate design guidelines, customer forecast, projected net revenue requirements,and discussions with the City staff,GovRates developed the proposed sewer rates shown in Table ES-1 of the executive summary of this report.The proposed monthly sewer rates reflect: Gradual increase of the percentage of revenue recovered through fixed /base charges. Maintenance of the relationships among customer classes consistent with those recognized in the 2016 rate study. Page 3@1 of 1707 2-2 . .: .... ._.. Water and Sewer Rate Study Adjustment of the sewer pass-through rate applied to all billed usage based on the latest data, summarized in the following Exhibit 2-2: Exhibit 2-2: Sewer System Pass-Through Rate for Fiscal Year 2021 .. _. Wastewater Billed Flow(kgal) 4,416,381 Allowance for Inflow and Infiltration 33.20% Projected Wastewater Treated(kgal) 6,611,841 Miami-Dade Wholesale Rate for Fiscal Year 2021 $3.2971 Tota I Purchased Wastewater Cost-Reta i l $21,799,902 Adjustment for DERM(6%) $23,191,385 Cost Per 1,000 Gallons $5.25 The proposed sewer rates are designed to generate the sewer revenue amounts needed during the Forecast Period. In order to provide the City with additional information regarding the current rates charged for service,a comparison of the City's existing and proposed rates for customers served by a 5/8-inch or 3/4-inch meter (representative of the single-family residential class and a large portion of the commercial class) with charges for similar service by 29 neighboring utilities in southeast Florida has been made. It should be recognized that a rate or bill comparison is not a "report card" on how well a utility is performing.Several factors have an effect on the level of rates charged. These factors may include, but are not limited to, the following: 1. Source of water supply and level of treatment required before the distribution of water to the ultimate customer, including how much of water supply is purchased from other utilities; 2. Plant capacity utilization, age and assistance in the funding of such plant capacity by federal grants, connection fees, etc.; 3. Overall size of the customer base (economies of scale)served as well as the type of customer served (certain customers may have higher usage requirements which may dampen per unit rates which is common for high commercial or industrialized customer bases for utilities); 4. Geographic density of the customer base (utilities with many high-density multifamily customers may have lower unit costs); 5. General fund and administrative fee transfers made by municipal and county systems which may account for differences in level of rates charged; Page 392 of 1707 2-3 Cl" . 1 Water and Sewer Rate Study 6. Bond covenants and funding requirements of the rates; and 7. Level of capital improvements required to meet service area needs, including the construction of growth-related assets in relation to service area expansion. For the utilities included in the rate comparisons on Tables 2-1 through 2-3 at the end of this section, no analysis has been made of the above-mentioned factors as they relate to the reported water and sewer rates currently being charged by the other utilities surveyed for the purposes of this rate review. However, the proposed water and sewer rates of the City produce bills that are comparable/competitive with those of neighboring utilities. Figure 2-1 at the end of this section shows a graphical comparison of how bills under the proposed Fiscal Year 2021 rates compare with those of other "neighboring" utilities for a single family residential customer with a monthly usage of 7,000 gallons — the historical average monthly usage for a 5/8" or 3/4" meter customer in this class. As indicated in Figure 2-1, at the 7,000-gallon usage level,seven (7) utilities—the City of Lake Worth Beach,the City of Hollywood, the City of Dania Beach, the City of Wilton Manors, the City of North Miami Beach, the City of Oakland Park, and the Town of Davie — currently charge more for combined water and sewer service than what the City would charge under the Fiscal Year 2021 proposed rates. Moreover, it is important to note that the majority of the surveyed utilities are currently evaluating the sufficiency of their water and sewer rates or have already scheduled future rate adjustments. The City currently provides wholesale sanitary sewer service to the Village of Bal Harbour, the Town of Bay Harbor Islands, and the Town of Surfside (previously defined as the "Satellite Municipalities"). Pursuant to the agreement for service between the City and the Satellite Municipalities, the wholesale rate is a volumetric-only rate which includes: i)the pass-through of the cost of purchased sewer service from the County; ii) an allowance for transmission-related operating expenses and administration; and iii) an allowance for the funding of renewals and replacements. Based on our review,GovRates recommends wholesale rates of$4.0935 per 1,000 gallons of service for the wet season and $3.2129 per 1,000 gallons for the dry season ($3.6532 per 1,000 gallons average rate) effective in Fiscal Year 2021. The determination of this rate is included on Table 2-6 at the end of this section, and the following is a summary discussion of the cost components considered in the derivation of the wholesale sewer rate: The Miami-Dade County wholesale sanitary sewer rate charged to the City for sanitary sewer treatment and disposal service. For the Fiscal Year 2021,the County wholesale sanitary sewer rate will be $3.7092 during the wet season and $2.8850 during the dry season, or an average of$3.2971 per 1,000 gallons. Page 393 of 1 707, 2-4 . Water and Sewer Rate Study • An Operation and Maintenance charge to recover the City's costs of facilities shared with each of the Satellite Municipalities— Booster Pump Stations No. 28 and 29 plus force mains between the interconnection point for each of the Satellite Municipalities, the booster stations, and the County mains. These costs were initially identified in a study performed by CDM Smith, Inc., the results of which were summarized in their "City of Miami Beach 2007 Satellite City Wastewater Transmission Cost of Service Letter Report" dated December 6, 2007 (the "CDM Report"). The CDM Report identified operation and maintenance charges of $0.0460 per 1,000 gallons for Booster Station 28 and $0.0520 for Booster Station 29. These amounts have been indexed based on the historical change in the Miami-Fort Lauderdale- West Palm Beach Index,the index utilized for most of the City's rates,fees,and charges. From December 2007 to December 2019, this CPI factor has increased by 24.66%. The Operation and Maintenance Expense Charge included in the rate for Fiscal Year 2021 was $0.1222 per 1,000 gallons based on the application of the index. An Administration Fee of 1.5% as allowed per the City's agreements with the wholesale customers. A renewal and replacement allowance equal to 5% of the total rate to provide for the recovery of depreciation expenses as allowed per the agreements with the Satellite Municipalities. Based on discussions with City staff,this methodology is proposed to be applied for deriving the Fiscal Year 2021 wholesale sewer rate. The derivation of the proposed wholesale sewer rates for the Satellite Municipalities as shown in Table 2-4 and summarized in the following Exhibit 2-3: Exhibit 2-3: Derivation of Satellite Munici•alities Wholesale Sewer Rates for Fiscal Year 2021 1 ' saription Wet Season Dry Season Miami-Dade County Wholesale Sewer Rate($/1,000 Gallons) [2] $3.7092 $2.8850 Operation and Maintenance Charges [3] 0.1222 0.1222 Subtotal $3.8314 $3.0072 Administration Charge of 1.5%[4] 0.0575 0.0451 Rate with Administration Charge $3.8888 $3.0523 Renewal and Replacement Al Iowanceof5.00%ofTota l Rate[5] 0.2047 0.1606 Total Rate($/1,000 Gallons) $4.0935 $3.2129 [1] Amounts derived from Table 2-4. [2] County rates effective October 1,2020. [3] Reflects costs identified in the CDM Report adjusted for historical changes in the CPI. [4]The 1.5%administration fee is allowed per the agreements with the Satellite Municipalities. [5]The renewal and replacement allowance provides for the recovery of depreciation expenses as allowed per the agreements with the Satellite Municipalities. Page 394 of 1707 2-5 Table 2-1 City of Miami Beach, Florida Comparison of Typical Monthly Residential Bills for Water Service Residential Service for a 5/8"or 3/4"Meter[1] WATER.USAGE 1 ,;• 0 ,„ 2,000 4,000 5,000 I 1,000 i 10,000 12,000 15,000 20,000 1]1T1. Description" Gallons, Gallons _ GallonsGallons j Gallons[2] 1 Gallons . Gallons Gallons Gallons City of Miami Beach,Florida I Existing Water Rates-Effective 10/1/2019 $ 8.50 $ 14.22 $ 19.94 $ 22.80 $ 28.52 $ 40.54 $ 49.70 $ 63.44 $ 91.58 2 Proposed Water Rates-Effective ASAP 9.35 15.55 21.75 24.85 31.05 43.30 52.45 66.17 93.53 3 Difference-Amount 0.85 1.33 1.81 2.05 2.53 2.76 2.75 2.73 1.95 4 Difference-Percent 10.0% 9.4% 9.1% 9.0% 8.9% 6.8% 5.5% 4.3% 2.1% Surveyed Utilities-Located in Miami-Dade County 5 City of Coral Gables[3] $ 3.92 $ 3.92 $ 10.60 $ 14.41 $ 25.07 $ 41.68 $ 52.75 $ 75.47 $ 116.52 6 City of Hialeah[4][5] 5.11 10.41 15.71 - 18.36 24.08 32.66 38.64 47.61 62.56 7 City of Homestead[4][5] 7.54 9.26 11.31 12.50 14.89 18.67 21.47 26.14 35.55 8 Miami-Dade County[6] 3.92 3.92 10.60 14.41 25.07 41.68 52.75 75.47 116.52 9 City of North Miami Beach[5] 13.70 21.34 28.98 32.80 40.44 53.19 61.69 77.59 104.09 10 City of Opa-Locka[4] 4.48 10.40 16.32 19.28 26.68 ' 37.78 61.86 97.98 188.28 Surveyed Utilities-Located Outside Miami-Dade County I I City of Boynton Beach[6] $ 12.65 $ 16.03 $ 19.41 $ 21.10 $ 24.48 $ 30.89 $ 36.95 $ 46.04 $ 61.19 12 Broward County[6] 17.13 20.37 24.90 27.81 37.54 58.00 71.64 96.39 137.64 13 City of Cooper City[6] 12.79 19.13 25.47 28.64 35.98 46.99 56.29 70.24 93.49 14 City of Coral Springs[6] 13.95 17.43 20.91 23.60 28.98 39.73 47.79 65.91 96.11 15 City of Dania Beach[6] 14.55 22.73 30.91 35.00 48.08 67.70 80.78 102.03 142.88 16 Town of Davie[6] 22.23 29.57 36.91 40.58 51.52 67.93 82.53 104.43 140.93 17 City of Delray Beach 15.72 15.72 16.97 18.22 20.72 24.47 26.97 32.97 42.97 18 City of Fort Lauderdale[6] 6.77 11.67 19.53 24.94 35.76 54.71 68.25 95.64 141.29 19 City of Hallandale Beach[6] 19.81 27.91 36.29 40.48 49.22 62.33 72.03 86.58 110.83 20 City of Hollywood[6] 7.82 14.50 22.06 28.74 42.11 : 62.16 80.74 120.80 187.58 21 City of Lake Worth Beach[6] 21.14 27.96 34.78 40.03 50.53 ' 70.00 84.22 121.54 183.74 22 City of Margate[6] 12.46 19.90 27.34 31.06 39.43 1 53.38 62.68 76.63 104.58 23 City of Miramar[6] 15.93 22.87 29.81 33.28 41.78 ' 54.53 63.03 75.78 102.48 24 City of Oakland Park[6] 15.19 28.27 42.15 49.49 64.17 88.31 105.11 131.35 178.55 25 Palm Beach County[6] 14.80 17.78 20.76 24.06 30.66 40.56 57.18 82.11 123.66 26 City of Pembroke Pines[6] 17.38 17.38 24.13 30.88 44.38 64.63 78.13 98.38 132.13 27 City of Plantation[6] 14.24 18.28 22.32 24.34 30.41 42.56 50.66 68.87 99.22 28 City of Riviera Beach[6] 18.13 23.35 28.57 31.18 38.32 ' 49.03 58.43 72.53 96.03 29 Seacoast Utility Authority 21.11 23.25 25.39 26.46 31.74 44.37 52.79 65.42 86.47 Page 395 of 1707 2-6 Table 2-1 • City of Miami Beach, Florida Comparison of Typical Monthly Residential Bills for Water Service 1 Residential Service yfor Mya 5/8"or 3/4"Meter[11 • 41]'x4 Y'. .q.,.l mp�s .. ,..q.. ...:f'� f e. 7} .,.f ✓�. :1:: i tzrx p .�.' I S"":!� ,{\.�y 1 l\*7 ,.* k1,••'::'11,', ,-:'1 .:. - to.'• , '. it , 3,000 .. 4,000- 5;000'. , ; ""7,000 '10,000 12,000 15,100 20,000 €e .' , ''.- - Description. -- >.. -- Gallons. n: Gallons, - - • Gallons,,- ,Gallons . ,1;Gallons[2] ! • Gallons • Gallons Gallons Gallons - 30 City of Sunrise[6] 20.87 29.05 37.23 41.32 49.50 61.77 69.95 82.22 102.67 3 I City of Tamarac[6] 11.77 15.31 19.44 21.80 ' 27.72 ' 38.40 45.52 64.21 95.36 32 City of West Palm Beach[6] 23.08 30.22 37.36 40.93 48.99 62.43 71.41 87.21 113.55 33 City of Wilton Manors[6] 26.69 35.43 44.17 48.54 57.28 : 70.39 79.13 92.24 118.94 34 Other Florida Utilities Average $ 14.31 $ 19.43 $ 25.53 $ 29.11 $ 37.43 $ 51.07 $ 61.77 $ 80.68 $ 114.34 35 Minimum 3.92 3.92 10.60 12.50 14.89 18.67 21.47 26.14 35.55 36 Maximum 26.69 35.43 44.17 49.49 64.17 88.31 105.11 131.35 188.28 Footnotes: [11 Amounts reflect bills under single family residential user rates in effect July 2020 and do not include any taxes,franchise fees,or water restriction surcharges,if any.These bills also reflect rates charged to customers within the municipal borders(e.g.,no outside-municipality surcharges,if applied,are included in the bill comparison). [2] Reflects historical average usage of a typical single family residential customer with both water and wastewater service within the service area of the City of Miami Beach's utility system. [3] The Miami-Dade Water and Sewer Department currently provides water on a retail basis for the City of Coral Gables;Coral Gables provides retail sanitary sewer. [4] Utility purchases sanitary sewer on a wholesale basis from the Miami-Dade Water and Sewer Department. [5] Utility purchases potable water service on a wholesale basis from the Miami-Dade Water and Sewer Department. [6] Utility is currently involved in a rate study,is planning to conduct a rate study,or plans to implement a rate revision or price index/pass-through adjustment within the next twelve months following the comparison preparation date. Page 396 of 1707 ..s• ,.. k:.tt R:e!. .>:,,.;, . 2-7 Table 2-2 City of Miami Beach, Florida Comparison of Typical Monthly Residential Bills for Sewer Service Residential Service for a 5/8"or 3/4"Meter[1] METERED WATER USAGE i e 0 2,000 4,000 5,000 i 7,000 10,000 12,000 15,000 20,000 Description . Gallons.;:, ` Gallons.. Gallons Gallons I Gallons 121 : Gallons Gallons Gallons Gallons City of Miami Beach,Florida I Existing Sewer Rates-Effective 10/1/2019 $ 9.19 $ 29.47 $ 49.75 $ 59.89 . $ 80.17 $ 110.59 $ 130.87 $ 161.29 $ 211.99 2 Proposed Sewer Rates-Effective ASAP 10.11 30.63 51.15 61.41 81.93 112.71 133.23 164.01 215.31 3 Difference-Amount 0.92 1.16 1.40 1.52 1.76 2.12 2.36 2.72 3.32 4 Difference-Percent 10.0% 3.9% 2.8% 2.5% 2.2% 1.9% 1.8% 1.7% 1.6% Surveyed Utilities-Located in Miami-Dade County 5 City of Coral Gables[3] $ 4.80 $ 13.20 $ 22.56 $ 30.42 $ 46.18 $ 70.16 $ 86.15 $ 110.13 $ 150.10 6 City of Hialeah[4][5] 5.59 18.13 30.67 36.94 50.42 70.64 84.58 105.49 140.34 7 City of Homestead[4][5] 15.27 21.74 28.21 31.44 37.92 47.62 54.09 63.80 79.98 8 Miami-Dade County[6] 6.83 6.83 21.71 30.18 47.13 72.54 89.49 114.91 157.27 9 City of North Miami Beach[5] 34.50 47.48 61.46 68.95 83.93 108.26 124.48 149.80 192.00 10 City of Opa-Locka[4] 4.48 14.14 23.80 28.63 42.41 63.08 94.16 140.78 218.48 Surveyed Utilities-Located Outside Miami-Dade County I 1 City of Boynton Beach[6] $ 19.16 $ 23.56 $ 27.96 $ 30.16 $ 34.56 , $ 34.56 $ 34.56 $ 34.56 $ 34.56 12 Broward County[6] 20.54 29.06 37.58 41.84 50.36 63.14 71.66 84.44 84.44 13 City of Cooper City[6] 27.67 33.99 40.31 43.47 49.79 59.27 59.27 59.27 59.27 14 City of Coral Springs[6] 23.04 31.80 40.56 44.94 53.70 66.84 75.60 88.74 110.64 15 City of Dania Beach[6] 21.52 36.44 51.36 58.82 73.74 96.12 111.04 133.42 170.72 16 Town of Davie[6] 39.83 54.17 68.51 75.68 90.02 111.53 125.87 147.38 147.38 17 City of Delray Beach 0 18.04 24.82 31.61 35.00 41.78 51.96 58.74 58.74 58.74 18 City of Fort Lauderdale[6] 11.33 19.65 33.00 42.19 60.57 88.14 106.52 134.09 180.04 19 City of Hallandale Beach[6] 20.21 28.47 37.01 41.28 50.20 63.58 73.48 88.33 113.08 20 City of Hollywood[6] 7.83 27.24 46.65 56.36 75.77 104.89 116.73 116.73 116.73 21 City of Lake Worth Beach[6] 15.66 29.64 43.62 50.61 64.59 85.56 99.54 99.54 99.54 22 City of Margate[6] 31.62 - 31.62 31.62 31.62 31.62 31.62 31.62 31.62 31.62 23 City of Miramar[6] 18.65 28.35 38.05 42.90 52.60 67.15 76.85 91.40 115.65 24 City of Oakland Park[6] 18.00 30.76 43.52 49.90 62.66 81.80 94.56 113.70 113.70 25 Palm Beach County[6] 16.60 20.64 24.68 29.42 38.90 53.12 53.12 53.12 53.12 26 City of Pembroke Pines[6] 22.24 22.24 28.99 35.74 49.24 69.49 82.99 103.24 136.99 27 City of Plantation[6] 18.65 29.07 39.49 44.70 55.12 70.75 81.17 96.80 122.85 28 City of Riviera Beach[6] 17.54 23.18 28.82 31.64 37.28 45.74 45.74 45.74 45.74 29 Seacoast Utility Authority 0 30.84 32.26 33.68 34.39 35.81 37.94 37.94 37.94 37.94 Page 397 of 1707 2-8 Table 2-2 City of Miami Beach, Florida Comparison of Typical Monthly Residential Bills for Sewer Service Residential Service for a 5/8"or 3/4"Meter 11] METERED'WATER USAGE gine• 0 ' - 2,00 . ' 4,000 �'.5400 1 7,000 I 10,000 12,000' 15,000 20,000 . :4Tti. • Description Gallons . Gallons Gallons Gallons ! Gallons[2[ : Gallons Gallons Gallons Gallons 30 City of Sunrise[6] 29.68 38.00 46.32 50.48 58.80 71.28 79.60 92.08 96.24 3 I City of Tamarac[6] 18.75 28.35 37.95 42.75 52.35 66.75 76.35 76.35 76.35 32 City of West Palm Beach[6] 13.77 24.63 35.48 40.91 51.76 68.05 78.73 78.73 78.73 33 City of Wilton Manors[6] 11.44 27.24 43.04 50.94 66.74 90.44 106.24 129.94 129.94 34 Other Florida Utilities Average $ 18.76 $ 27.47 $ 37.18 $ 42.49 $ 53.31 $ 69.38 $ 79.69 $ 92.44 $ 108.70 35 Minimum 4.48 6.83 21.71 28.63 31.62 31.62 31.62 31.62 31.62 36 Maximum 39.83 54.17 68.51 75.68 90.02 111.53 125.87 149.80 218.48 Footnotes: 111 Amounts reflect bills under single family residential user rates in effect July 2020 and do not include any taxes,franchise fees,or water restriction surcharges,Wally.These hills also reflect rates charged to customers within the municipal borders(e.g.,no outside-municipality surcharges, if applied,are included in the bill comparison). 121 Reflects historical average usage of a typical single family residential customer with both water and wastewater service within the service area of the City of Miami Beach's utility system. 131 The Miami-Dade Water and Sewer Department currently provides water on a retail basis Ibr the City of Coral Gables;Coral Gables provides retail sanitary sewer. 141 Utility purchases sanitary sewer on a wholesale basis from the Miami-Dade Water and Sewer Department. 151 Utility purchases potable water service on a wholesale basis from the Miami-Dade Water and Sewer Department. 161 Utility is currently involved in a rate study,is planning to conduct a rate study,or plans to implement a rate revision or price index/pass-through adjustment within the next twelve months following the comparison preparation date. Page 398 of 1707 • 2-9 Table 2-3 City of Miami Beach, Florida Comparison of Typical Monthly Residential Bills for Combined Water and Sewer Service Residential Service for a 5/8"or 3/4"Meter[1] COMBINED WATER AND SEWER . 1 e 0 2,000 4,000 5,000 7,000 10,000 12,000 15,000 20,000 ,NOb Description Gallops, ;Gallons Gallons 1 Gallons [21 Gallons Gallons_ Gallons Gallons City of Miami Beach,Florida 1 Existing Combined Rates-Effective 10/1/2019 $ 17.69 $ 43.69 $ 69.69 $ 82.69 $ 108.69 $ 151.13 $ 180.57 $ 224.73 $ 303.57 2 Proposed Combined Rates-Effective ASAP 19.46 46.18 72.90 86.26 112.98 156.01 185.68 230.18 308.84 3 Difference-Amount 1.77 2.49 3.21 3.57 4.29 4.88 5.11 5.45 5.27 4 Difference-Percent 10.0% 5.7% 4.6% 4.3% 3.9% 3.2% 2.8% 2.4% 1.7% Surveyed Utilities-Located in Miami-Dade County 5 City of Coral Gables[3] $ 8.72 $ 17.12 $ 33.16 $ 44.83 $ 71.25 $ 111.84 $ 138.90 $ 185.60 $ 266.61 6 City of Hialeah[4][5] 10.70 28.54 46.38 55.30 74.50 103.30 123.22 153.10 202.90 7 City of Homestead[4][5] 22.80 30.99 39.52 43.95 52.80 66.30 75.56 89.95 115.53 8 Miami-Dade County[6] 10.75 10.75 32.31 44.59 72.20 114.22 142.24 190.37 273.79 9 City of North Miami Beach[5] 48.20 68.82 90.44 101.75 124.37 161.45 186.17 227.39 296.09 10 City of Opa-Locka[4] 8.96 24.54 40.12 47.91 69.09 i 100.86 156.02 238.76 406.76 Surveyed Utilities-Located Outside Miami-Dade County I I City of Boynton Beach[6] $ 31.81 $ 39.59 $ 47.37 $ 51.26 $ 59.04 $ 65.45 $ 71.51 $ 80.60 $ 95.75 12 Broward County[6] 37.67 49.43 62.48 69.65 87.90 121.14 143.30 180.83 222.08 13 City of Cooper City[6] 40.46 53.12 65.78 72.11 85.77 106.26 115.56 129.51 152.76 14 City of Coral Springs[6] 36.99 49.23 61.47 68.54 82.68 106.57 123.39 154.65 206.75 15 City of Dania Beach[6] 36.07 59.17 82.27 93.82 121.82 163.82 191.82 235.45 313.60 16 Town of Davie[6] 62.06 83.74 105.42 116.26 141.54 179.46 208.40 251.81 288.31 17 City of Delray Beach 33.76 40.54 48.58 53.22 62.50 76.43 85.71 91.71 101.71 18 City of Fort Lauderdale[6] 18.10 31.32 52.53 67.13 96.33 142.85 174.77 229.73 321.33 19 City of Hallandale Beach[6] 40.02 56.38 73.30 81.76 99.42 125.91 145.51 174.91 223.91 20 City of Hollywood[6] 15.65 41.75 68.71 85.10 117.88 • 167.05 197.47 237.53 304.31 21 City of Lake Worth Beach[6] 36.80 57.60 78.40 90.64 115.12 155.56 183.76 221.08 283.28 22 City of Margate[6] 44.08 51.52 58.96 62.68 71.05 85.00 94.30 108.25 136.20 23 City of Miramar[6] 34.58 51.22 67.86 76.18 94.38 121.68 139.88 167.18 218.13 24 City of Oakland Park[6] 33.19 59.03 85.67 99.39 126.83 170.11 199.67 245.05 292.25 25 Palm Beach County[6] 31.40 38.42 45.44 53.48 69.56 93.68 110.30 135.23 176.78 26 City of Pembroke Pines[6] 39.62 39.62 53.12 66.62 93.62 134.12 161.12 201.62 269.12 27 City of Plantation[6] 32.89 47.35 61.81 69.04 85.53 113.31 131.83 165.67 222.07 28 City of Riviera Beach[6] 35.67 46.53 57.39 62.82 75.60 94.77 104.17 118.27 141.77 29 Seacoast Utility Authority 51.95 55.51 59.07 60.85 67.55 82.31 90.73 103.36 124.41 Page 399 of 1707 2-10 Table 2-3 City of Miami Beach, Florida Comparison of Typical Monthly Residential Bills for Combined Water and Sewer Service Residential Service for a 5/8"or 3/4"Meter 111 COMBINED WATER AND SEWER • 0 2,000 4,000 5,000 7,000 10,000 12,000. 15,000 20,000 No. Description Gallons . Gallons Gallons • Gallons Gallons 12[ 1 Gallons Gallons Gallons Gallons 30 City of Sunrise[6] 50.55 67.05 83.55 91.80 108.30 133.05 149.55 174.30 198.91 31 City of Tamarac[6] 30.52 43.66 57.39 64.55 80.07 105.15 121.87 140.56 171.71 32 City of West Palm Beach[6] 36.85 54.84 72.84 81.84 100.75 130.47 150.14 165.94 192.28 33 City of Wilton Manors[6] 38.13 62.67 87.21 99.48 124.02 _ 160.83 185.37 222.18 248.88 34 Other Florida Utilities Average $ 33.07 $ 46.90 $ 62.71 $ 71.60 $ 90.74 $ 120.45 $ 141.46 $ 173.12 $ 223.03 35 Minimum 8.72 10.75 32.31 43.95 52.80 65.45 71.51 80.60 95.75 36 Maximum 62.06 83.74 . 105.42 116.26 141.54 179.46 208.40 251.81 406.76 Footnotes: Ill Amounts reflect bills under single family residential user rates in effect July 2020 and do not include any taxes, franchise fees,or water restriction surcharges,limy.These bills also reflect rates charged to customers within the municipal borders(e.g.,no outside-municipality surcharges,if applied,are included in the bill comparison). 121 Reflects historical average usage of a typical single family residential customer with both water and wastewater service within the service area of the City of Miami Beach's utility system. 131 The Miami-Dade Water and Sewer Department currently provides water on a retail basis for the City of Coral Gables;Coral Gables provides retail sanitary sewer. 141 Utility purchases sanitary sewer on a wholesale basis from the Miami-Dade Water and Sewer Department. 151 Utility purchases potable water service on a wholesale basis from the Miami-Dade Water and Sewer Department. 161 Utility is currently involved in a rate study,is planning to conduct a rate study,or plans to implement a rate revision or price index/pass-through adjustment within the next twelve months Ibllowing the comparison preparation date. Page 400 of 1707 2-11 Figure 2-1 City of Miami Beach, Florida Comparison of Monthly Charges for Combined Water and Sewer Service for Single Family Residential Customers Using 7,000 Gallons 160.00 Water Miami Beach Water 140.00 I.Sewer Miami Beach Sewer $108.6T $112.98 120.00 100.00 $80.00 $60.00 $40.00 jr�P.i $20.00 IP' a * oro *a * * * *car * * * * * * * * * < * " * * * * r * * � reatoo r1tioy .6 Ne o .c1 � ya `0rro rarea .o ee, aa , ro � �ca eo �a v ca .pA +bo G. �` Oet � aaa4a4cy . aQ- av oo aa o 0 a, 4 f toe a G .§� d� cpJfeeiat ,10e$ 1Q ..4q> k o 0 `$ •` e4be Ie ..4, 4. aOa `so * 4d P 0Q _ 4 ‘ aA o 'SaIoQ a `ew o \e � Crr o� •.0 0 ao 0� o� oo41/4406 ` o� ao� aaa G `J.e 47:. 4‘Q ,§ to a% \,0 aaQ` o t+yool. + P,txIe . '4. ,e 0 oh0J‘ mo �ee '�G 'oGoooeom � te � 0acetiG te � ka � rOa 0 +6 46 G oAk G` ok G\� QQG ,Qia �erQ � 0 o . io 81/4'4° 81/4 aC> .°6 Ok 0 ao `kNiGCO � 04` •S aGGC,6oo1/4 yDoG` 1G J e CO% > •'6 'a 0 .\' t GC CON GaC [*] Utility is currently involved in a rate study, is planning to conduct a rate study, or plans to implement a rate revision or price index I pas: through adjustment within the next twelve months following the comparison preparation date Page 401,of 1707 i '. 2-12 Table 2-4 City of Miami Beach,Florida Water and Sewer Rate Study Derivation of Satellite Municipalities Wholesale Sewer Rates for Fiscal Year 2021 , k • . . . , booster Rooster +;:Description ° Determinants ° Station 28 Station 29 Total > Wet Season Dry Season 1 Average Miami-Dade County Wholesale Sanitary Sewer Rate($/1,000 Gallons)[1] $3.2971 $3.7092 $2.8850 2 Operation and Maintenance Charges($/1,000 Gallons)in 2007[2] $0.0460 $0.0520 Inflation from December 2007 to December 2019 3 Consumer Price Index,All Urban Consumers-Miami-Fort Lauderdale-West Palm Beach,All Items-December 2007[3] 217.319 4 Consumer Price Index,All Urban Consumers-Miami-Fort Lauderdale-West Palm Beach,All Items-December 2019[3] 270.918 5 Change 24.66% 24.66% 24.66% 6 FY 2021 Operation and Maintenance Cost $0.0573 $0.0648 $0.1222 $0.1222 $0.1222 7 Subtotal $3.4193 $3.8314 $3.0072 8 Administration Fee of 1.50% 1.50% 0.0513 0.0575 0.0451 9 Rate with Administration Charge $3.4706 $3.8888 $3.0523 10 Renewal and Replacement Allowance of 5.00%of Total Rate[4] 5.00% 0.1827 0.2047 0.1606 11 Rate with Renewal and Repalcement Allowance($/1,000 Gallons) $3.6532 $4.0935 $3.2129 12 Adjustment for DERM(0.00%) 0.00% $3.6532 $4.0935 $3.2129 Footnotes: [1] The County has informed the City that these rates will become effective on October I,2020. . [2] Source:CDM City of Miami Beach 2007 Satellite City Wastewater Transmission Cost of Service Analysis Letter Report dated December 6,2007,Tables 8 and 9. Tables 8 and 9. [3] Source:Bureau of Labor Statistics Consumer Price Index,All Urban Consumers-Miami-Fort Lauderdale-West Palm Beach-CUURS35BSAO. (https://data.bis.gov/cgi-bin/srgate). [4] The renewal and replacement allowance provides for the recovery of depreciation expenses as allowed per the agreements with the Satellite Municipalities. Page 402 of 1707 • 2-13 a,.. 3�-Sc . t,r• _ r . ,�f'',� v 'sl" - ; 4 • • • 7.= f.b .ht_ -,-..-.:"....,.t.-;.:::Y.- :%;,:::::4-•-.. ''''..0 e 3 `ea`'�..71'.•: 7S yr }S' r tl.+ " _ `: r iiy• 0a ,' r• :!. l Lac �..'- :i-et Tt , ,:t-. r 5 l # � + ` tib4_ `: '�rt}; ifi77x :,4 .d, i tne ? st: : '.x ' 0 - ~ : ORDINANCE NO. 2016-4039 AN ORDINANCE OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, AMENDING CHAPTER 110 OF THE CODE OF THE CITY OF MIAMI BEACH ENTITLED "UTILITIES," ARTICLE IV, ENTITLED "FEES, CHARGES, RATES AND BILLING PROCEDURE," AT SECTION 110-166, ENTITLED "SCHEDULE OF WATER RATES AND TAPPING CHARGES;" AT SECTION 110-168, ENTITLED "SANITARY SEWER SERVICE CHARGE" ARE TO BE AMENDED; AND CREATING SECTION 110-171, ENTITLED "RATE INDEXING," IN ORDER TO ADJUST AND MODIFY HOW WATER AND SANITARY SEWER RATES ARE CALCULATED AND APPLIED; AND ALSO AMENDING APPENDIX A TO CHAPTER110, ENTITLED "FEE SCHEDULE" TO INCREASE AND RESTRUCTURE THE WATER RATES AND SANITARY SEWER SERVICE CHARGES IMPOSED BY THE CITY PURSUANT TO SECTIONS 110-166, 110-168, AND 110-171; PROVIDING FOR CODIFICATION; REPEALER; SEVERABILITY; AND AN EFFECTIVE DATE. WHEREAS, Chapter 110, of the Code of the City of Miami Beach, entitled "Utilities," establishes the City's potable water rates and how to calculate the rate and apply the rate to all water users and the sanitary sewer rates and how to calculate the rate and apply the rate to all sanitary sewer users; and WHEREAS, the City's utility rates for water and sanitary sewer services are structured to collect the necessary revenues to meet annual operating and maintenance costs of the water and sanitary sewer infrastructure, to cover debt service for water and sewer bonds, to fund capital improvements to the City's utility system infrastructure, maintain adequate operating fund and capital reserves, and to pay Miami-Dade County Water and Sewer Department (WASD) for wholesale water purchased and for the treatment of the collected City sewage; and WHEREAS, WASD has historically raised the rates for wholesale water and sanitary sewer to recover its cost of providing service and it is anticipated by WASD that it will continue to raise the rates for service due operating expenditures and debt service increases and the need to fund future capital improvements; and WHEREAS, the City adopted Resolution No. 95-21585, as amended and supplemented from time to time, which authorized the issuance of utility revenue bonds to finance capital improvements to the utility system (herein after"System")which included a requirement that the revenues of the System shall at all times meet the rate covenant requirements as delineated in such resolution for the protection of the bondholders; and WHEREAS, in addition to the above WASD rate increase, the City Commission directed that the City review its utility rates and method of calculating the fees under Chapter 110; and WHEREAS, the City retained the firm of Public Resources Management Group, Inc. (PRMG)to assist in determination of revised water and sanitary sewer rates in order to meet the projected expenditure and funding needs of the City's utility system as identified in the Fiscal Year 2016/2017 budget; and Page 1 Page 404 of 1707 WHEREAS, PRMG recommended revised rates and rate policies to be more consistent with industry norms in the application of rates; promote water conservation and the most efficient use of potable water; initiate a rate structure that over time will more adequately recover the cost of service and promote the overall sustainability of the utility system; provide the ability to adjust rates due to changes in the cost of wholesale water and wastewater service as provided by WASD; and provide the ability to index the rates for inflation and other expenses to provide utility operating margins to fund capital improvements and the repayment of debt issued by the City in support of the funding of capital improvements; and WHEREAS, in order to properly fund the City's water and sewer program, and to implement the PRMG rate structure findings, so that the city can not only take into account the actual WASD rate increases, but, also the other PRMG recommendations due to continued inflation on the cost of providing water and sanitary sewer by the City, the City seeks to amend Chapter 110, to codify and pass through to the residents the WASD rate increases; to index rates annually to pass through to the residents increases in costs due to inflation on the cost of operations and maintenance; and to incorporate an adjustment for operating expenses would serve to keep the rate stabilization fund healthy and user fees consistent with the cost of providing service; and WHEREAS, during the August 29, 2014 meeting of the Finance and Citywide Projects Committee (FCWPC), the Committee recommended approval of the pass through of the respective water and sewer rate increases, as well as establishing a policy of automatically implementing the percentage increases of water and sewer rates that are enacted by Miami- Dade WASD to the entire fund without further Commission action; and WHEREAS, the Committee also directed the Administration to follow up with all appropriate administrative actions to assure that fees are commensurate with the cost of service provided to the Satellite Cities; and WHEREAS, the amendments set forth below are necessary to accomplish the above objectives. NOW THEREFORE, BE IT ORDAINED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA: SECTION 1. Chapter 110 of the Miami Beach City Code entitled "Utilities," Article IV, entitled "Fees, charges, rates and billing procedure," at section 110-166, entitled "Schedule of water rates and tapping charges;" Section 110-168, entitled "Sanitary sewer service charge," and Section 110-171, entitled "Rate indexing" are hereby amended as follows: * * * Chapter 110— UTILITIES * * * DIVISION 2.- RATES, FEES AND CHARGES * * * Page 2 Page 405 of 1707 Sec. 110-166. - Schedule of monthly water user rates and tapping charges. (a) There is hereby imposed, upon all premises within the city connected to or using the facilities of the city's potable water system, a monthly water user rate. Everywater eupply premise connected to or using the facilities of the city's potable water system shall be billed monthly user rates consisting of: i)a base facility charge which serves as the monthly minimum service charge on each service installed, varying with and based upon the size of the meter installed in accordance with the rules of the public works department; ii) a water consumption charge: and iii) a purchased water pass-through adjustment rate to recover the cost of purchased wholesale water as billed enacted by the Miami-Dade Water and Sewer Department (WASD). This-minimum-The monthly water user rates charged for service shall be in accordance with the consumer applicability provisions and the corresponding schedule set forth in Appendix A,ifl-append as may be adjusted from time to time based on the provisions of the section. There shall not be a rental charge on meters. The monthly water user rates shall be charged to each individually metered water consumer each month in accordance with the following applicability provisions: (1) Individual Metered Residential Service - applicable to all consumers that represent service to a residential dwelling unit that is individually metered for potable water service that is not classified as irrigation service. (2) Master Metered Multifamily Residential Service - applicable to all consumers that represent service to a residential dwelling units that is master-metered (more than one residential dwelling unit being served by the water meter measuring service to the premise) which would include, but not be limited to, condominiums, apartments, and duplexes, that are not classified as irrigation service. (3) Non-residential Service - Applicable to all water customers that are not classified as individually metered residential service, master-metered residential service, or irrigation service which primarily represents service to commercial customers public authorities, and institutional customers. (4) Residential Irrigation Service - Applicable to all residential dwelling units that are individually metered for domestic water use (reference Sec. 110-166 (a)(i)) and which have a separate meter for irrigation service or other similar water use. (5) Master Metered Multifamily Residential Irrigation Service - applicable to all master metered residential customers that are individually metered for domestic use (reference Sec. 110-166 (a)(ii)) and which have a separate meter for irrigation service or other similar water use. c6) Non-residential Irrigation Service - applicable to all customers classified as non-residential that are individually metered for domestic use (reference Sec. 110- 166 (a)(ii)) and which have a separate meter for irrigation service or other similar water use. Page 3 Page 406 of 1707 (b)To the extent practical, all water delivered to a consumer shall be metered and shall be billed the water consumption charge and the purchased water pass-through charge, which rate shall be prorated for each 100 gallons in the event of increments of less than 1,000 gallons for all consumers of water. With respect to the billing for water use, the water consumption rates and the purchased water pass-through rate as defined in this section may be added together for rate application or billing purposes on a consumers bill. lc) Pass-Through of Purchased Wholesale Water Charges. The Purchased Water Pass-through Rate, which is applied to all water consumers being billed for potable water service, shall be increased or decreased by the city by applying a pass-through adjustment factor for any change in the average annual rates charged to the city for wholesale potable water purchased from WASD (the "Water Pass-Through Adjustment") to the Purchased Water Pass-through Rate charged by the city. (1) Adjustment Schedule. The implementation of the adjustment to the Purchased Water Pass-Through Rate for any month that a change in wholesale potable water rates by WASD is effectuated ("Water Cost Recovery") shall occur without a public hearing. Water Cost Recovery shall be employed each time that WASD adjusts the average annual wholesale potable water rates that are billed to the city. Any adjustment to the Purchased Water Pass-Through Rate based on the determination of the change in wholesale rates shall be implemented in the month immediately following the determination of the Purchased Water Pass-Through Adjustment. The Purchased Water Pass-Through Rate as shown on Appendix A and as may be further adiusted automatically in the future by the implementation of the provisions of this section and which are then in effect shall be increased or decreased by the city by applying a Purchased Water Pass-through Adjustment established in accordance with this subsection to the then effective Purchased Water Pass-Through Rate prior to such application. Nothing herein shall preclude the city from making additional changes to the monthly water user rates for service, (2) Applicability of Purchased Water Rates. The Purchased Water Pass-Through Rate shall be in addition to any water consumption rates for all retail and wholesale customers that are billed for potable water service by the city. The following are the customers that shall be subject to the application of the Purchased Water Pass-through Rate and shall be subject to the pass-through for changes in the cost of purchased water from WASD (the"Applicable Customers"): (i) The retail water customer classes that are billed the water consumption charge referenced in this section. (ii) All separate utilities or local governments that may receive wholesale potable water service provided by the city currently or in the future which is not considered as retail customers. (3) Calculation of Purchased Water Pass-Through Adjustment. The Purchased Water Pass-Through Adjustment shall be calculated using the following formula: PWPTA = ((IWWC—PWWC)* (1 /(1-(DF+T+O)) Page 4 Page 407 of 1707 Where: PWPTA = The Purchased Water Pass-Through Adjustment to be used for Water Cost Recovery to determine the monetary adjustment in the Purchased Water Pass-through Rate to be applied the Applicable Customers. The PWPTA represents the respective dollar increase or decrease to account for changes in wholesale potable water rates charged by WASD to the city that is added or subtracted, respectively to the Purchased Water Pass-Through Rate. IWWC = The increased annual average wholesale or purchased water rate charged by WASD expressed on a dollar per 1,000 gallons basis that became effective for the month immediately after the PWWC. PWWC = The prior annual average wholesale or purchased water rate charged by WASD expressed on a dollar per 1,000 gallons basis immediately prior to the billing of the adjusted wholesale or purchased water rate defined as the IWWC. DF = The fee paid to the Department of Environmental Resources Management (DERM) which is based on a percent of rate revenues billed by the city. T = Any and all taxes or tax equivalents that may be paid by the water system that is based on revenues billed by the city, including any payment in lieu of tax imposed by the city on its water system. 0 = Any and all charges that may be paid by the city on behalf of the water system that is based on revenues billed by the city, including any funding of renewals and replacement fund deposits that is determined as a percent of revenues billed. (4) Determination of Purchased Water Pass-Through Rate. The Purchased Water Pass-Through Rate shall be determined based on the addition or subtraction of the Purchased Water Pass-Through Adjustment to the rates in effect immediately preceding such adjustment and shall be rounded to the nearest cent. The Purchased Water Pass-Through Adjustment application shall be based on the following formula: APWTR = PWPTR+ PWPTA Where: APWTR = The Adjusted Purchased Water Pass-Through Rate that is to be placed in effect after the application of the Purchased Water Pass-Through Adjustment to all Applicable Customers billed for potable water service. PWPTR = The Purchased Water Pass-Through Rate in effect immediately prior to the application of the PWPTA. Page 5 Page 408 of 1707 PWPTA = The Purchased Water Pass-Through Adjustment as determined as a result of a change in wholesale water rates as billed by WASD. (5) An example of the calculation of the determination of the Purchased Water Pass- Through Adjustment and the corresponding change to the Purchased Water Pass- Through Rate is illustrated in the following table: Line Formula No. Reference Amount Prior Wholesale Purchased Water Rate($/1,000 gallons) 1 PWWC $1.7350 Increased Wholesale Purchased Water Rate($11,000 gallons) 2 IWWC $1.7700 Percent Chan•e in Wholesale Purchased Water Rate 3=(2-1)/1 2.02% Ad isstments De•artment of Environmental Resources Mana•ement 4 DF 8.00% Taxes and Tax Equivalents 5 T 0.00% Other Adjustments 6 O 0.00% Adjustment Factor= 1/(1-(D+T+O)=1/0.92 7 1.08696 Purchased Water Pass-Throu•h Percent Ad'ustment 8=(3*7) 2.20% Prior Purchased Water Pass-Through Rate($11,000 gallons) 9 PWPTR $1.93 Purchased Water Pass-Through Adjustment 10=9*8 PWPTA 119.2 Adiusted Purchased Water Pass-Through Rate($11,000 11=9+10 APWTR $1.95 gallons) (d) Pass-Through Adjustment Charges. The Applicable Rates as shown on Appendix A and as may be further adjusted automatically in the future by the implementation of the provisions of this section and which are then in effect shall be increased or decreased by the city by applying a pass-through adjustment factor established in accordance with this subsection (the "Pass-Through Factor") to the then effective Applicable Rates for increases or decreases in the Applicable Costs. All Applicable Rates so adjusted (the "Pass-Through Rates")shall be charged by the city's water system. (1) Adjustment Schedule. The implementation of Pass-Through Rates for any month associated with a change in Applicable Costs ("Cost Recovery") shall be placed into effect automatically and shall occur without a public hearing. Nothing herein shall preclude the city from making additional changes to the monthly water user rates for service. (2) Applicable Rates. The water base facility, water consumption charges. and Purchased Water Pass-through Rate referenced in subsection 110-166(a) shall be subject to Cost Recovery. (3) Applicable Costs. Only the following cost categories qualify as Applicable Costs for Cost Recovery: (i) All increases or decreases in the percentage charge of the Department of Environmental Resources Management. Page 6 Page 409 of 1707 (ii) All increases or decreases in the application of any tax or tax equivalents, including any payment in lieu of tax imposed by the city on its water system. (iii) All other cost increases incurred by the water system as a result of any regulatory chances or requirements imposed by any regulatory agency having jurisdiction over the utility system operations(a "Regulator') (4) Calculation of Pass-Through Factor. The Pass-Through Factor shall be calculated using the following formula: PTF = ARR/ ER Where: PTF = The Pass-Through Factor used for Cost Recovery to determine the monetary adiustment in the Applicable Rates. The PTF represents the estimated annual increase in the Applicable Costs, expressed asa percentage of the most recent historical revenues derived from the Applicable Rates for the most recently completed fiscal year. ARR = Additional Required Revenue equal to the estimated annual change in the Applicable Costs that will affect the overall cost of providing water system services as determined by the city. ER = The total actual revenues earned by the Enterprise System from the Applicable Rates for the potable water system as reported in the city for the most recently completed fiscal year. (5) Determination of Pass-Through Rates. The Pass-Through Rates shall be determined based on the Pass-Through Factor applied uniformly to the Applicable Rates in effect and shall be rounded to the nearest cent. The Pass-through application shall be based on the following formula: PTR = (AR)(1 + PTF) Where: PTR = The Pass-Through Rates that are to be placed in effect for the current fiscal year through application of the Pass-Through Factor. AR = The Applicable Rates in effect immediately prior to the application of the Pass-Through Factor. PTF = The Pass-Through Factor as determined by the city to recover the net change in Applicable Costs. Page 7 Page 410 of 1707 () On all water supply service, each month shall be a complete period in itself, and no excess consumption of water during one month shall be charged charge or be added to the consumption of any other month. (1) Exception. The provisions contained in this subsection (e) shall not apply to an owner or consumer of a single-family home that participates in the "budget billing" process of the utility billing system. The "budget billing" process allows owners or consumers to pay the same monthly amount for water and sewer consumption based on the average of the previous annual consumption history. If the variance in actual consumption becomes more than 50 percent of the annual consumption average, the budgeted amount would be recalculated or the budget billing would cease and regular billing would commence. To be eligible to use this "budget billing" feature, the owner and/or consumer would have to submit an application to the finance department for budget billing. After the approval of the finance department, the budget billing would commence and would only cease upon written request by the owner or consumer or the failure to pay the budget amount when the payment is due. `) A monthly base facility charge as shown on Appendix A shall be billed to all privately owned fire-protection systems and equipment connected to the city water system in accordance with the size of the service line connecting the private system to the city's system. All costs of providing fire sprinkler service, including the service lateral, meter vault and detector check meter shall be the applicant's responsibility. If any consumer shall connect any appurtenance other than sprinkler heads to a fire service line, that consumer shall pay all connection-related charges set out in this section and the monthly water service charges identified in this section regarding service to customers delineated under the general service designation. (g) Upon the application of the owner or consumer for water service on the premises to which there has not been made any previous service for water, the tapping charges as specified in appendix A shall be made to cover the cost of the tap and the installation of the service to the property line of the lot to be supplied with water service. (he) Every owner or consumer making an application for water service shall be required to make a deposit with the public works department'called a guarantee of payment deposit. The amount of such deposit shall be according to the size of the service, as specified in appendix A. If the owner or consumer making such deposit wishes the service to be discontinued, the,guarantee of payment deposit shall be refunded less outstanding charges for water, sewer, stormwater or garbage and waste. If at any time the total service charges for a given account exceed the amount of the deposit, the city reserves the right to demand an additional deposit up to four times the amount of any previous monthly bill on that service. (i#) A request by the owner or consumer to have the water meter re-read for validation of the correctness of a meter reading will result in a fee in accordance with the schedule set forth in appendix A. This fee will be charged only if the re-read validates the accuracy of the reading in question. (ig)A request by the owner or consumer to have a special water meter read at a time other than a normally scheduled read date as set by the utility will result in a fee in accordance with the schedule set forth in appendix A. Page 8 Page 411 of 1707 (k1 ) Meter/meter equipment and City of Miami Beach utility property servicing a premises found damaged, destroyed or missing will be charged to the owner or consumer in accordance with the schedule set forth in appendix A. (li) A request by the owner or consumer to have a field visit by a technician. This fee will be charged only if the technician finds that the problem/issue is not that of the utility. Sec. 110-168.–Schedule of monthly Ssanitary sewer user rates.service-charge. (a) There is hereby imposed, upon all premises within the city connected to or using the facilities of the city's sanitary sewer system, a monthly sanitary sewer service charge-user — - !! :•• :- - ala - - - - - ' - e - se - - -.. - _ _ _ t _ _ - _ : _ - _ -_ "e-- _ •• - - . Every premise connected to or using the facilities of the city's sanitary sewer system shall be billed monthly user rates consisting of: (1) a base facility charge which serves as the monthly minimum service charge'on each service installed, varying with and based upon the size of the meter installed in accordance with the rules of the public works department; (2) a sanitary sewer consumption charge; and (3) purchased sanitary sewer pass-through adjustment rate to recover the cost of purchased wastewater treatment and disposal services as billed by WASD. The monthly sewer user rates charged for service shall be in accordance with the consumer applicability provisions and the corresponding schedule set in Appendix A as may be adjusted from time to time based on the provisions of the section. 44)–The billed sewer consumption shall be based on the metered water delivered to the consumer for which the monthly water user rates apply. The provisions of this section shall not be applicable to any water sold and delivered through separate meters measuring water delivered and consumed solely for swimming pools, lawn sprinkler systems, cooling towers or other purposes not requiring the use of sanitary sewer system facilities of the city. The Page 9 Page 412 of 1707 The monthly sanitary sewer user rates shall be charged to each consumer each month in accordance with the following applicability provisions; (1) Individual Metered Residential Service — Applicable to all consumers that represent service to a residential dwelling unit that is individually metered for water service. (2) Master-metered Multifamily Residential Service — Applicable to all sewer consumers that represent service to a residential dwelling units that is master- metered (more than one residential dwelling unit being served by the water meter measuring service to the premise) which would include, but not be limited to, condominiums, apartments, and duplexes. (3) Non-residential Service — Applicable to all sewer customers that are not classified as individually metered residential service or master-metered residential service which primarily represents service to commercial, public authorities, and institutional customers. (b) To the extent practical, all sanitary sewer service provided to a consumer shall be based on the metered water delivered to the premise, exclusive of water-only service which is separately metered by the city, and shall be billed the sewer consumption charge and the purchased sanitary sewer pass-through charge, which rate shall be prorated for each 100 gallons in the event of increments of less than 1,000 gallons for all consumers being billed for sanitary sewer service. With respect to the billing for sanitary sewer use, the sewer consumption rates and the purchased sanitary sewer pass-through rate as defined in this section may be added together for rate application or billing purposes on a consumers bill. (c)Pass-Through of Purchased Wholesale Sanitary Sewer Charges. The Purchased Sanitary Sewer Pass-through Rate, which is applied to all sanitary sewer consumers being billed for sewer service, shall be increased or decreased by the city by applying a pass-through adjustment factor for any change in the rates charged to the city for wholesale wastewater treatment and disposal services purchased from WASD (the "Sanitary Sewer Pass-Through Adjustment")to the Purchased Sewer Pass-through Rate charged by the city. (1) Adjustment Schedule. The implementation of the adjustment to the Purchased Sanitary Sewer Pass-Through Rate for any month that a change in wholesale sanitary sewer rates by WASD is effectuated ("Sewer Cost Recovery") shall occur without a public hearing. Sewer Cost Recovery shall be employed each time that WASD adjusts the average annual wholesale sanitary sewer rates that are billed to the city. Any adjustment to the Purchased Sanitary Sewer Pass-Through Rate based on the determination of the change in wholesale rates shall be implemented in the month immediately following the determination of the Purchased Sanitary Sewer Pass-Through Adjustment. The Purchased Sanitary Sewer Pass-Through Rate as shown on Appendix A and as may be further adjusted automatically in the future by the implementation of the provisions of this section and which are then in effect shall be increased or decreased by the city by applying a Purchased Sanitary Sewer Pass-through Adjustment established in accordance with this subsection to the then effective Purchased Sanitary Sewer Pass-Through Rate Page 10 Page 413 of 1707 prior to such application. Nothing herein shall preclude the city from making additional changes to the monthly sanitary sewer user rates for service. (2) Applicability of Purchased Sanitary Sewer Rates. The Purchased Sanitary Sewer Pass-Through Rate shall be in addition to any sewer consumption rates for all retail and wholesale customers that are billed for wastewater treatment and disposal services by the city. The following are the customers that shall be subject to the application of the Purchased Sanitary Sewer Pass-through Rate and shall be subject to the pass-through for changes in the cost of purchased wastewater treatment and disposal services from WASD (the"Applicable Customers"): (i) The retail water customer classes that are billed the sewer consumption charge referenced in this section. (ii)All separate utilities or local governments that may receive wholesale sewer service provided by the city currently or in the future which is not considered as retail customers. j3) Calculation of Purchased Sanitary Sewer Pass-Through Adjustment. The Purchased Sanitary Sewer Pass-Through Adjustment shall be calculated using the following formula: PSPTA = ((IWWC—PWWC)` (1 /(1- (DF+T+O)) Where: PSPTA = The Purchased Sanitary Sewer Pass-Through Adjustment to be used for Sewer Cost Recovery to determine the monetary adjustment in the Purchased Sanitary Sewer Pass-through Rate to be applied the Applicable Customers. The PSPTA represents the respective dollar increase or decrease to account for changes in average annual wholesale wastewater rates charged by WASD to the city that is added or subtracted, respectively to the Purchased Sanitary Sewer Pass-Through Rate. IWSC = The increased average annual wholesale or purchased sanitary sewer rate charged by WASD expressed on a dollar per 1,000 gallons basis that became effective for the month immediately after the PWSC. PWSC = The prior average annual wholesale or purchased sanitary sewer rate charged by WASD expressed on a dollar per 1,000 gallons basis immediately prior to the billing of the adjusted wholesale or purchased sewer rate by WASD. DF = The fee paid to the Department of Environmental Resources Management (DERM) which is based on a percent of rate revenues billed by the city. Page 11 Page 414 of 1707 T = Any and all taxes or tax equivalents that may be paid by the sewer system that is based on revenues billed by the city, including any payment in lieu of tax imposed by the city on its sanitary sewer system. 0 = Any and all charges that may be paid by the city on behalf of the sanitary sewer system that is based on revenues billed by the city. including any funding of renewals and replacement fund deposits that is determined as a percent of revenues billed. (4) Determination of Purchased Sanitary Sewer Pass-Through Rate. The Purchased Sanitary Sewer Pass-Through Rate shall be determined based on the addition or subtraction of the Purchased Sanitary Sewer Pass-Through Adiustment to the rates in effect immediately preceding such adjustment and shall be rounded to the nearest cent. The Purchased Sanitary Sewer Pass-Through Adjustment application shall be based on the following formula: APSTR = PSTR + PSPTA Where: APSTR = The Adjusted Purchased Sanitary Sewer Pass-Through Rate that is to be placed in effect after the application of the Purchased Sewer Pass-Through Adjustment to all Applicable Customers billed for wastewater service. PSTR = The Purchased Sanitary Sewer ;Pass-Through Rate in effect immediately prior to the application of the PSPTA. PSPTA = The Purchased Sanitary Sewer Pass-Through Adiustment as determined as a result of a change in wholesale wastewater rates as billed by WASD, (5) An example of the calculation of the determination of the Purchased Sanitary Sewer Pass-Through Adjustment and the corresponding change to the Purchased Sanitary Sewer Pass-Through Rate is illustrated in the following table: Page 12 Page 415 of 1707 Line Formula No. Reference Amount Prior Wholesale Purchased Sanitary Sewer Rate ($/1,000 gallons) 1 PWSC $2.7879 Increased Wholesale Purchased Sanitary Sewer Rate($/1,000 gallons) 2 IWSC $2.9477 Percent Change in Wholesale Purchased Sanitary Sewer Rate 3=12-1)/1 5.73% Adjustments Department of Environmental Resources Management 4 OF 8.00% Taxes and Tax Equivalents 5 T 0.00% Other Adjustments 6 O 0.00% Adjustment Factor= 1/(1-(D+T+O))„=1/0.92 7 1.08696 Purchased Sewer Pass-Through Percent Adjustment 8=(3`7) 6.22% Prior Purchased Sanitary Sewer Pass-Through Rate ($/1,000 gallons) 9 PSTR $3.50 Purchased Sanitary Sewer Pass-Through Adjustment 10=9`8 PSPTA $0.22_ Adiusted Purchased Sanitary Sewer Pass-Through Rate ($/1,000 gallons) 11=9+10 APSTR $3.72 (d) Pass-Through Adjustment Charges. The Applicable Rates as shown in Appendix A and as may be further adjusted automatically in the future by implementation of the provisions of this section and which are then in effect shall be increased or decreased by the city by applying a pass-through adjustment factor established in accordance with this subsection (the "Pass-Through Factor") to the Applicable Rates for increases or decreases in the Applicable Costs. All Applicable Rates so adjusted (the "Pass-Through Rates") shall be charged by the city's sanitary sewer system. (1) Adjustment Schedule. The implementation of Pass-Through Rates for any month associated with a change in Applicable Costs ("Cost Recovery") shall be placed into effect automatically and shall occur without a public hearing. Nothing herein shall preclude the city from making additional changes to the monthly sanitary sewer user rates for service. (2) Applicable Rates. The sewer base facility, sewer consumption charges, and Purchased Sewer Pass-through Rate referenced in subsection 110-167(a) shall be subject to Cost Recovery. (3) Applicable Costs. Only the following cost categories qualify as Applicable Costs for Cost Recovery: (i) All increases or decreases in the percentage charge of the Department of Environmental Resources Management. Page 13 Page 416 of 1707 iii) All increases or decreases in the application of any tax or tax equivalents. including any payment in lieu of tax imposed by the city on its sanitary sewer system. (iii) All other cost increases incurred by the sanitary sewer system as a result of any regulatory changes or requirements imposed by any regulatory agency having jurisdiction over the utility system operations (a "Regulator"). (4) Calculation of Pass-Through Factor. The Pass-Through Factor shall be calculated using the following formula: PTF = ARR/ ER Where: PTF = The Pass-Through Factor used for Cost Recovery to determine the monetary adiustment in the Applicable Rates. The PTF represents the estimated annual increase in the Applicable Costs. expressed as a percentage of the most recent historical revenues derived from the Applicable Rates for the most recently completed fiscal year. ARR = Additional Required Revenue equal to the estimated annual change in the Applicable Costs that will affect the overall cost of providing sanitary sewer system services as determined by the city. ER = The total actual revenues earned by the Enterprise System from the Applicable Rates for the sanitary sewer system as reported in the city for the most recently completed fiscal year. (5) Determination of Pass-Through Rates. The Pass-Through Rates shall be determined based on the Pass-Through Factor applied uniformly to the Applicable Rates in effect and shall be rounded to the nearest cent. The Pass-through application shall be based on the following formula: PTR = (AR)(1 + PTF) Where: PTR = The Pass-Through Rates that are to be placed in effect for the current fiscal year through application of the Pass-Through Factor. AR = The Applicable Rates in effect immediately prior to the application of the Pass-Through Factor. PTF = The Pass-Through Factor as determined by the city to recover the net change in Applicable Costs. * * * Page 14 Page 417 of 1707 Sec. 110-171 Rate Indexing. (a) Except as otherwise provided in this subsection, the monthly user rates established in subsections 110-167(a) for the water system and 110-168(a) for the sanitary sewer system (collectively, the "Applicable Rates") as shown on Attachment A and as may be further adjusted automatically in the future by implementation of the provisions of this section and which are then in effect shall be increased by the City each year by applying the price index factor established for that year in accordance with this subsection (the "Price Index Factor") to the then Applicable Rates to offset the effects of inflation on the cost of operating and maintaining the system. The Rate Index shall never be less than 0.0%. All Applicable Rates so adiusted (the "Indexed Rates") shall be implemented by the City. (1) Adjustment Schedule. Each implementation of Indexed Rates ("Rate Indexing") shall be placed into effect automatically and shall occur without a public hearing. Rate Indexing shall not be employed more than once in any fiscal year. Any Indexed Rates based on the operating and maintenance expenses for the most recently completed fiscal year shall be implemented as of October 15` of the subsequent fiscal year. Nothing herein shall preclude the City from making additional changes to the water or wastewater rates for service. (2) Applicable Rates. The water base facility charge and water consumption charges referenced in subsections 110-167(a) for the water system and sanitary sewer base facility charge and sanitary sewer consumption charges referenced in subsections 110-168(a) for the sanitary sewer system shall be subiect to Rate Indexing. The purchased water pass-through rate and the_purchased sanitary sewer pass-through rates as referenced in the respective subsections shall not be subject to Rate Indexing. (3) Calculation of Price Index Factor. The Price Index Factor shall be determined based on the actual reported financial results as contained in the annual comprehensive annual financial report and the records for the most recently completed fiscal year preceding the determination of the Rate Index (the "Calculation Period"). By way of example, the Rate Index to be applied on October 1, 2017 would be based on the actual financial results for the twelve months ended September 30, 2016. The Price Index Factor shall be calculated using the following formula: PIF = (FOP - (PWE + PSE + PT)1*EPI)/ 1(ER- PTR)/ * (1 /(1-(DF+T+O1))1 Where: PIF = The Price Index Factor used for Rate Indexing to determine the monetary adjustment in the Applicable Rates. The PIF represents the estimated increase in operation and maintenance expenses during the Calculation Period that is subject to inflation, expressed as a percentage of Applicable Rates revenues earned during the Calculation Period. The amount of the Rate Index increase is a component of any additional revenue required by the Utility System to ensure compliance with the Bond Covenants and fiscal requirements of the utility system (the "Additional Required Revenue"). Page 15 Page 418 of 1707 OP = The total expenses, paid or accrued. for the operations, maintenance, and repair of the water and wastewater systems as reported in the comprehensive annual financial report and other financial records for the city for the Calculation Period after excluding: (a) allowances for depreciation and amortization expense; and (b) capitalized salaries and other overhead related to the city's Capital Improvement Program (CIP). Such total expenses as adjusted for the stated exclusions are hereinafter referred to as the"Operating Expenses". PWE = That component of the Operating Expenses (OP) that represent the cost of purchased water service from WASD for the Calculation Period, adjusted to include the fee paid to the Department of Environmental Resources Management (DERM) which is based on a percent of rate revenues billed by the city for this component of expense. PSE = That component of the Operating Expenses (OP) that represent the cost of purchased sanitary sewer service from WASD for the Calculation Period, adiusted to include the fee paid to the Department of Environmental Resources Management (DERM) which is based on a percent of rate revenues billed by the city for this component of expense. PT = The sum of all other components of the Operating Expenses (OP) for the Calculation Period for which increases in those components may be recovered separately as a pass-through adjustment pursuant to subsections 110-167(d) for the water system and 110-168(a) for the wastewater system. EPI = The Consumer Price Index—All Urban Consumers, Miami-Fort Lauderdale, as published by Bureau of Labor Statistics (the "Effective Price Index") as reported for the month of April of the current year compared to the index reported for the immediately preceding month of April. By way of example, the Effective Price Index published by Bureau of Labor Statistics — All Urban Consumers, Miami-Fort Lauderdale, as of April 2015 was 245.195 and as of April 2016 was 248.741 or a change of 1.446% which shall be applied to the applicable Operating Expenses reported for Fiscal Year 2015. ER = The total actual revenues earned by the Utility System from the Applicable Rates as reported in the comprehensive annual financial reports and other financial records for the Calculation Period. PTR = The total actual revenues earned by the Utility System during the Calculation Period from the application of i) the Purchased-Water Pass- Through Rate; ii) the Purchased-Wastewater Pass-Through Rate; and iii) any other expense that was categorized as a pass-through expense and separately evaluated. (4) Price Index calculation example. (i) An example of the calculation of the Price Index Factor based on reported Fiscal Year 2015 information is illustrated in the following table: Page 16 Page 419 of 1707 Line Formula No. Reference Amount Total Operating Expenses 1 OP $56906,238 Less: Purchased Water Expenses 2 PWPTR $14,258,442 Purchased Wastewater Expenses 3 PSPTR 20,865,353 Other Pass-through Expenses 4 PT 0 Adjusted Operating Expenses 5=1-2-3-4 $21.782,443 Effective Price Index EPI April 2015 CPI Index 6 245.195 April 2016 CPI Index 7 248741 Change in CPI Index 8=7-6 3.546 Annual Percent Chance 9=8/6 1.44% Additional Required Revenue (Numerator) 10=5*9 $313,667 Actual Applicable Rate Revenues Earned 11 ER $73,291,986 Less: PTR Purchased-Water Pass-Through Rate Revenue 12 $15,498,307 Purchased-Sanitary Sewer Pass-Through Rate Revenue 13 22,679.732 Applicable-Rate Revenue(Denominator) 14=11-12-13 $35,113,974 Price Index Factor beforeAd'ustments 15=10/14 0.89% Adjustments: Department of Environmental Resources 16 DF 8.00% Management Taxes and Tax E.uivalents 17 T 0.00% Other Adjustments 18 O 0.00% Adjustment Factor= 1/(1-(D+T+O)) =1/0.92 19 1.08696 Price Index Ad'ustment 20=15`19 PIF 0.97% (ii) Determination of Indexed Rates. The Indexed Rates shall be determined based on the Price Index Factor applied uniformly to the Applicable Rates in effect and shall be rounded to the nearest cent. The determination shall be based on the following formula: IR = (AR)(1 + PIF) Where: Page 17 Page 420 of 1707 IR = The Indexed Applicable Rates that are to be placed in effect for the current fiscal year through application of the Price Index Factor. AR = The Applicable Rates in effect immediately prior to the application of the Price Index Factor. PIF = The Price Index Factor determined for the Calculation Period. SECTION 2. That Chapter 110, "UTILITIES," Article IV "Fees, charges, rates and billing procedures,"at APPENDIX A is hereby amended as follows: * * * APPENDIX A FEE SCHEDULE * * * Article IV. Fees, Charges, Rates and Billing Procedures Division 2. Rates, Fees and Charges 110-166(a) Minimum service charge: Minimum Monthly Size- Se ►ice-Charge Water Meter per-Mopth October 2088) • 44E SAO $44445 7-;000 15.17 -1--17080 21.31 22 1-77000 37757 48,000 8840 4' 80,000 58 Page 18 Page 421 of 1707 LOLL JO ZZi abed 6 L abed eteltt 000'09 zir wee eae'et7 a€ tZz6C 000`Lt 1.1,'9Z 000'1.1. L 1.'91. 00elt t. 95't I.S 000 (Z08Z't ps6 tlittettied iekeAttse je) Knew thetem #�U0tte9 S �1t turttutetv1t 00-Z917 00e'00Z OZ'ttZ e00'0Zt eWt: 000109 wtr 0tr@@ 000'0k Zti"et 000'LI. 98.tet 000'1.1. e Zit Melt at 4.00. Y -Je tels itN A!9eJj8) JeletAt eraletto-estmes J0,31943 flit µ y" """It"J Y� 420000 277.20 200,090 462.00 Monthly Size-of & Se ice-Charge Atater Meter per-Month biiiin October---11-2003 44.2 5,000 $4-1,88 42! 7-7000 46.60 4'!i' 11,000 26,04 17,000 40.20 3" 40,000 94748 4" 80,000 488,88 42$,000 263.28 2007000 4-7-2,08 Minimum Monthly Size Service Meter �hbillings-on-or-after e-for s-on or er October- 004) -' 57000 $12.13 7-7090 46.96 Page 20 Page 423 of 1707 442 11,000 2649 2! x,008 44,05 40,000 96.48 4" 80,000 49248 6- 420T998 2nom 200,090 48298 Minimum Monthly Size-e€ Service-Charge Water Meter # (effective-fee billings-011-43fafter Octeber--12905) 5,000 a" 7-7000 4-7-.39 4442 4-1,000 2744 1-77000 41-:90 3" 40,000 98-A8 4" 80,000 1-96.88 6" 120,000 295:28 6" 2007000 492,08 Minimum Size-of AAeathly Meter Service-Char-9e per-Menth (effective-fee bil error er • Page 21 Page 424 of 1707 OctobeF--12006) i 3 " 57000 $13.95 7-7000 49:53 4442 . 417000 30:69 3" 4-7,000 47-13 3" 407000 111.60 4^' 807500 223.20 6" 4-20,000 334-.30 6" 2807000 558.00 441RiMUM Monthly Size-of Se Meter h ffec ive-1er -on -aftef October 1 r 2007) 70 $•6• '5 77000 22.61 44,500 36,53 447000 54.-91• 3" 40;000 420 42 38;888 268740 6"- 428400 3160 8" 2007000 646.00 Size-of Gael:is-of Minimum Page 22 Page 425 of 1707 Meter Water Monthly {Month Service-Barge (effective-fee billings-error-a€ter October- 908) 3 57000 77000 27,46 4,5E 4-11030 42 2E 4-77000 65.96 ' 000 t70 4! 807000 34440 62 420,000 466760 8- 000 776.00 Minimum-Monthly� 'Service C a ge IVieter per-Month Octo/���� ber--41-2809) 57043G $24,80 9 !! 4-- 7T000 30.52 4 " 4-1780 496 2'• 47;000 71.12 3-' 407000 4-71.40 4-' 68;888 348.80 6E 420700061120 Page 23 Page 426 of 1707 LOLL 10 LZb 86ed bZ a6ed .: _ •- - iii - • - ' I - = - •_ • : ": iii -- : ii -- - - 6- _ 6- _ . : .: _ _ ._ ` . . iii' - - ' - _ • - • : - iii' -� ii - - - - I r - . : -: _ • _ • _ _ iii iii 0 ' i - _ . ' . . •' - - i _ _ - apoo /unowy uopd»osao s!q uoIJoes 0098 000'O at 0rtES 000'021 ..9 @t-^t€ 000'09 OZ-ttt OOO Ot LE•5L 0001/.1 t+t9i 000'-tt to-te 000'L • S1•ZZ$ 0061 (b 10Z 11 iegopo, e•ie-Ue-s6u#tt!q le e##0) ## Jetalllt Jetervt #e-s tette5 3 i5 Attlieetfit turrEuttitiet Malt 000'003 ala - - • . .. ... - . .. ... • - - • - . .... ..■ ... 110-166(a)(1) Individual Metered Residential Service Base Facili Char•e •er meter size Rate 3/4-inch $7.82 1-inch 8.16 1-112-inch 8.96 2-inch 9.76 3-inch 10.24 4-inch 11.80 Water Consumption Charge (per 1.000 gallons) _ 0 to 8.000 Gallons $0.90 ^ 8,001 to 16,000 Gallons 2.48 16,001 to 24,000 Gallons 3.69 Above 24,000 Gallons 5.04 Purchased Water Pass-Through Rate (per 1.000 gallons) All Water Use $1.93 110-166(a)(2) Master-Metered Multifamily Residential Service Base Facili Char•e •er meter size Rate 3/4-inch. $7.82 1-inch 16.88 1-1/2-inch 3220 2-inch 50.43 3-inch 97.39 4-inch 151.24 6-inch 302.99 8-inch 478.48 10-inch 686.84 12-inch 1.269.69 Water Consumption Charge (per 1.000 gallons) Block 1 $1.58 Block 2 2.70 Block 3 3.60 Page 25 Page 428 of 1707 Purchased Water Pass-Through Rate (per 1,000 gallons)_ _ All Water Use $1.93 (*1 Usage blocks by meter size: Block 1 Block 2 Block 3 Size of Meter jgallonslallons eons 3/4-Inch 0 to 16.000 16,001 to 32,000 Over 32,000 1-Inch 0 to 40.000 40.001 to 80,000 Over 80.000 1.5-Inch 0 to 80.000 80.001 to 160.000 Over 160.000 2-Inch 0 to 128.000 128.001 to 256.000 Over 256.000 3-Inch 0 to 256 0`00 256.001 to 512.000 Over 512.000 4-Inch 0 to 400.000 400.001 to 800,000 Over 800.000 6-Inch 0 to 800.000 800.001 to 1,600.000 Over 1.600.000 8-Inch 0 to 1.280.000 1,280,001 to 2,560,000 Over 2,560.000 10-Inch 0 to 1,840.000 1,840,001 to 3,680.000 Over 3,680,000 12-Inch 0 to 3.440.000 3,440.001 to 6.880.000 Over 6.880.000 110-1.66 a 3 Non-Residential Service Base Facili Char!e •er meter size Rate 3/4-inch $7.82 1-inch 1688 1-1/2-inch 32.20 2-inch 50.43 3-inch 97. 939 4-inch 151.24 6-inch 302.99 8-inch 478.48 10-inch 686.84 12-inch 1 269.69 Water Consumption Charge (per 1,000 gallons) (* Block 1 11.58 Block 2 2.70 Block 3 3.60 Purchased Water Pass-Through Rate (per 1,000 gallons) All Water Use $1.93 J`l Usage blocks by meter size: Block 1 Block 2 Block 3 Size of Meter fpallons) allons allons 3/4-Inch 0 to 16000 16.001 to 32,000 Over 32.000 1-Inch 0 to 40.000 40.001 to 80.000 Over 80,000 -1±c± 0 to 80.000 80,001 to 160.000 Over 160,000 2-Inch 0 to 128,000 128.001 to 256.000 Over 256.000 3-Inch 0 to 256,000 256.001 to 512.000 Over 512.000 4-Inch 0 to 400,000 400.001 to 800,000 Over 800,000 6-Inch 0 to 800.000 800.001 to 1,600,000 Over 1.600.000 8-Inch 0 too 1,280.000 1,280.001 to 2.560.000 Over 2.560.000 10-Inch 0 to 1.840.000 1,840,001 to 3,680,000 Over 3,680.000 12-Inch 0 to 3.440.000 3,440.001 to 6,880,000 Over 6.880.000 Page 26 Page 429 of 1707 110-166(a)(4) Individual Metered Residential Irrigation Service Base Facili Char•e •er meter size Rate 3/4-inch $7.82 1-inch 8.16 1-1/2-inch 8.96 2-inch 9.76 3-inch 10!24 4-inch 11.80 Water Consumption Charge (per 1,000 gallons) 0 to 16 000 Gallons $2.47 Above 16.000 Gallons 5.04 _ Purchased Water Pass-Through Rate (per 1,000 gallonsL _ All Water Use $1.93 110-166(a)(5) Master-Metered Multifamily Residential Irrigation Service_ Base Facility Charge (per meter size) Rate 3/4-inch $7.82 1-inch 16.88 1-1/2-inch 32.20 2-inch 50.43 3-inch 97.39 4-inch 151.24 6-inch 302.99 8-inch 478.48 10-inch 686.84 12-inch 1,269.69 Water Consumption Charge (per 1,000 gallons) I* Block 1 $2.47 Block 2 5.04 Purchased Water Pass-Through Rate (per 1,000 gallonsL All Water Use $1.93 J*1 Usage blocks by meter size: Block 1 gLoic Size of Meter ,gallons) !glom) 3/4-Inch 0 to 32.000 Over 32,000 1-Inch 0 to 80.000 Over 80,000 1.5-Inch 0 to 160.000 Over 160,000 2-Inch 0 to 256.000 Over 256.000 3-Inch 0 to 512.000 Over 512,000 4-Inch 0 to 800.000 Over 800.000 6-Inch 0 to 1,600,000 Over 1.600.000 8-Inch 0 to 2.560.000 Over 2.560.000 0 Inch 0 to 3,680,000 Over 1680.000 Page 27 Page 430 of 1707 I I 12-Inch 0 to 6,88A,000 Over 6,880.000 _110-166(a)(6) Non-Residential Irrigation Service Base Facility Charge (per meter size) Rate 3/4-inch $7.82 ,1-inch 16.88 1-1/2-inch 32.20 2-inch • 50.43 3-inch 97.39 4-inch 151.24 6-inch 302.99 8-inch 478.48 10-inch 686.84 12-inch 1,269.69 _ Water Consumption Charge (per 1,000 gallons) 1 1 Block 1 $2.47 Block 2 5,04 Purchased Water Pass-Through Rate (per 1,000 gallons) All Water Use $1.93 J*1 Usage blocks by meter size: Block 1 Block 2 Size of Meter jggILLUs allons 3/4-Inch 0 to 32.000 Over 32.000 1-Inch 0 to 80.000 Over 80.000 1.5-Inch 0 to 160.000 Over 160,000 2-Inch 0 to 256.000 Over 256,000 3-Inch 0 to 512.000 Over 512,000 4-Inch 0 to 800.000 Over 800.000 6-Inch 0 to 1,600.000 Over 1.600.000 8-Inch 0 to 2.560.000 Over 2.560.000 10-Inch 0 to 3,680.000 Over 3.680.000 12-Inch 0 to 6,880,000 Over 6.880,000 110-166(f) Fire sprinkler system Rate Base Facility Charge,(Der meter size) 2-inch $9.34 3-inch 17.18 4-inch 26.00 6-inch 50.50 8-inch 79_,90 10-inch 114.20 110-166(g) Tapping fee, per size of tap in inches: , Rate 3 -inch 4,726.00 11-inch , 4,665.00 Page 28 Page 431 of 1707 11/2-inch 5,106.00 2-inch 5,116.00 3-inch 5,627.00 4-inch 6,189.00 16-inch 6.808.00 110-166(h) Guarantee of payment deposit, per service in inches: 40.00 1 50.00 11/2 60.00 2 100.00 3 500.00 4 600.00 6 1,000.00 8 1,500.00 Re-read fee (Charged if meter found 110-1660 to be working properly) 25.00 110-166(j) Special read fee 25.00 Servicing a meter found damaged, destroyed or missing will require 110-166(1s) actual replacement cost plus all Actual costs costs associated with replacement of meter 110-166W Field visit fee: Normal business hours 25.00 After normal business hours I 50.00 Page 29 Page 432 of 1707 ... • -- - ; $3.11 erg-gallons, a#eetive--wit# billings-orr-or after October 1,2001; $ 0 ... - - - . - • . after October 1 2002. $ 03 r. r 1 000 October 1 2004. CSA 12 r. r 1 000 gallons 1, 200 ; and $4.21 Per 1,000 gallons; effective with billings o after October 11110 1, 2005; and-4=5p•r 1-000--gal{ens, .._ ... - - - • - - hillings o .ftcr October 1 '1004. and 6.34 per 1,000-gallons, effective with billings er after October 1, 201—s ' 4 • - • . bilin er-Getober 1, 201�.d 110-168(a)(1) Individual Metered Residential Service Base Facilit Char!e all meter sizes Rate All Meter Sizes $8.45 Sewer Consumption Charge (per 1,000 gallons) All Gallons (based on metered water consumption) $4.26 Purchased Sanitary Sewer Pass-Through Rate (per 1,000 gallons) All Gallons (based on metered water consumption) $4.76 110-168(a)(2) Master-Metered Multifamily Residential Service Base Facility Charge (per meter size) Rate 3/4-inch 1-inch 18.88 1-1/2-inch 36.25 2-inch 57.10 Page 30 Page 433 of 1707 3-inch 112.70 _4-inch 175.25 6-inch 349.00 8-inch 557.50 10-inch 800.75 12-inch 1.495.75 Sewer Consumption Charge (per 1,000 gallons) All Gallons (based on metered water consumption) $4.26 Purchased Sanitary Sewer Pass-Through Rate (per 1.000 gallonsl All Gallons(based on-metered water consumption) $4.76_ 110-168 a 3 Non-Residential Service Base Facili Char.e •er meter size Rate 3/4-inch $8.45 _1-inch 18.88 1-1/2-inch 3625 2-inch 57.10 3-inch 112.70 4-inch 175.25 6-inch 349.00 8-inch 557.50 10-inch 800.75 12-inch 1.495.75 Sewer Consumption Charge (per 1.000 gallons) All Gallons (based on metered water consumption) $4.26 Purchased Sanitary Sewer Pass-Through Rate (per 1,000 gallons) All Gallons (based on metered water consumption) $4.76 * * * SECTION 3. REPEALER All ordinances or parts of ordinances and all section and parts of sections in conflict herewith be and the same are hereby repealed. SECTION 4. CODIFICATION It is the intention of the City Commission, and it is hereby ordained that the provisions of this ordinance shall become and be made part of the Code of the City of Miami Beach as Page 31 Page 434 of 1707 amended; that the sections of this ordinance may be renumbered or relettered to accomplish such intention; and that the word "ordinance" may be changed to "section" or other appropriate word. SECTION 5. SEVERABILITY If any section, subsection, clause or provision of this Ordinance is held invalid, the remainder shall not be affected by such invalidity. SECTION 6. EFFECTIVE DATE • This Ordinance shall take effect ten days following adoption. PASSED and ADOPTED this a?7 day of Se pie rn ber , 2016. ./, /.- ,.;,- Aillie Mayor Philip Levi, - /7 ATTEST: APPROVED AS TO q /i Ca FORM&LANGUAGE • City Cler Rafael Gra do &FO EX CLITION ...21(AIL City Att. Underline denotes new Iangua,,.���"llllll"'"ol,l • \ �, Dote Strr� ikethh denotes delet:2'': ! a • p�,q 44,E I *1-MCORP OR ►EDS ;, ; Page 32 Page 435 of 1707 Ordinances -R5 t - MIAMI BEACH COMMISSION MEMORANDUM TO: Honorable Mayor and Members of the City Commission FROM: Jimmy L. Morales, City Manager DATE: September 27, 2016 . 5:10 p.m. Second Reading Public Hearing SUBJECT: AN ORDINANCE OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, AMENDING CHAPTER 110 OF THE CODE OF THE CITY OF MIAMI BEACH ENTITLED "UTILITIES," ARTICLE IV, ENTITLED "FEES, CHARGES, RATES AND BILLING PROCEDURE," AT SECTION 110-166, ENTITLED "SCHEDULE OF WATER RATES AND TAPPING CHARGES;" AT SECTION 110-168, ENTITLED "SANITARY SEWER SERVICE CHARGE" ARE TO BE AMENDED; AND CREATING SECTION 110-171, ENTITLED "RATE INDEXING," IN ORDER TO ADJUST AND MODIFY HOW WATER AND SANITARY SEWER RATES ARE CALCULATED AND APPLIED; AND ALSO AMENDING APPENDIX A TO CHAPTER 110, ENTITLED "FEE SCHEDULE" TO INCREASE AND RESTRUCTURE THE WATER RATES AND SANITARY SEWER SERVICE CHARGES IMPOSED BY THE CITY PURSUANT TO SECTIONS 110-166, 110- 168, AND 110-171; PROVIDING FOR CODIFICATION; REPEALER; SEVERABILITY;AND AN EFFECTIVE DATE. RECOMMENDATION The Administration recommends the City Commission adopt such rates to enable collecting revenues sufficient to cover the cost of operating, maintaining, repairing and financing the water and sewer enterprise funds. The Miami-Dade Water and Sewer Department (WASD) proposed a sewer rate increase to all wholesale customers of$.1598 for sewer per 1000 gallons effective October 1, 2016. In order to further the City goal of sustainability, the Administration is recommending that we transition to a conservation rate structure consistent with the guidance and recommendations of the South Florida Water Management District and approving the Ordinance on Second Reading Public Hearing. ANALYSIS The City's utility rates for water and sanitary sewer services are structured to collect the necessary revenues to meet annual operating and maintenance costs of the infrastructure, to cover debt service for water and sewer bonds, to maintain adequate operating fund reserves, and, to pay Miami-Dade County for wholesale water purchased, the treatment of the City's sewage and other fees. In general, the rates for water supply and sanitary sewer services are based on full cost recovery principles and consist of: Page 178 of 692 • Page 436 of 1707 • Pass-through of the wholesale rate the City pays to Miami-Dade County for the purchase of potable water and treatment of sewage; • Debt service for the Water and Sewer Revenue Bonds; • Operating and maintenance costs for the water and sewer utility; 8 % fee-of previous year total revenue paid to the Miami-Dade County Environmental Resource Management Department (DERM). • Public Resources Management Group, Inc. ("PRMG") was asked to evaluate the current rate structure and propose alternative (redesigned) rates as necessary to recover the costs of providing service given the target monthly user rate revenues for the Fiscal Year 2016/17 for consideration by the City Commission which will incentivize conservation of valuable water resources, meet industry standards regarding cost recovery/rate application to its customers, and maintain rate reasonableness among customers. The Miami-Dade Water and Sewer Department has informed all wholesale customers that the proposed water rate for FY2016/17 will remain unchanged. WASD has also notified wholesale customers that their proposed sewer rate will be $2.9477, an increase of $0.1598 above the current rate of $2.7879 per 1000 gallons. The cost of the proposed FY2016/17 sewer rate increase to Miami Beach is approximately $2,926,000. The proposed WASD wholesale water and sewer rates are subject to approval by the Board of County Commissioners at their Public Budget Hearings, scheduled for September 8 and September 22, 2016. Based on their review of the City's existing rates and projected rate revenues, billing statistics and operating costs, and understanding the City desire to enact a conservation rate, the recommended rate structure adjustments are listed below. A) Implementation of water and wastewater monthly base facility charges for the residential class. B) Implementation of water and wastewater monthly base facility charges for the general services class (commercial, master-metered residential, government, etc.) that increase based on meter size to recognize the diverse capacity (demand) characteristics among such customers which is consistent with utility rate structure norms and structures recommended by the Florida Public Service Commission(FPSC). C) Removal of the minimum water flow in the water minimum service charges to promote conservation and provide a pricing structure where water consumption charges are based solely on the amount of water a consumer uses: D) Implementation of tiered water rates to incentivize water conservation to those customers with discretionary water use(i.e., individually metered residential and irrigation customers); and E) Provide a cost recovery mechanism to promote long-term rate sustainability by the implementation of a purchased water and wastewater pass-through and price index rate adjustment. Water Revenue Review and Recommendation All operational expenditure increases related to the proposed cost of living adjustment to salaries, increased costs of health insurance and pension, and increases in other operating costs can be absorbed without the requirement to increase the water rate. PRMG is proposing to modify the monthly billing to consist of: I) a base facility charge which serves as the monthly minimum service charge on each service installed,based upon the size of the meter installed in accordance with the standards of the Public Works Department; ii)a water consumption charge; and iii) a purchased water pass-through adjustment rate to recover the cost of purchased water Rage 179 of 692 • age 437 of 1707 as billed by the Miami-Dade Water and Sewer Department (WASD).The monthly water user rates charged for service have been proposed and may be adjusted from time to time. PRMG also recommends that a monthly base facility charge be billed to all privately-owned fire protection systems and equipment connected to the city water system based on the size of the service line connecting the private system to the Citys system. These systems provide fire protection and are not metered. The recommended monthly base facility charges are as follows: Proposed Fire Protection Fees By Meter Size Base Facility Charge (per meter size) Rate 2-inch $9.34 3-inch 17.18 4-inch 26.00 6-inch 50.50 8-inch 79.90 10-inch 114.20 The derivation of these charges are based on the methodology utilized by the Florida Public Service Commission (the "FPSC") in the regulation of private utilities that is often applied by public utilities in the State of Florida. In accordance with Section 25-30.465 of the Florida Administrative Code: 25-30.465 Private Fire Protection Rates. The rate for private fire protection service shall be a charge based on the size of the connection rather than the number of fixtures connected.The rate shall be one-twelfth the current base facility charge of the utility's meter sizes, unless otherwise supported by the utility. Sewer Revenue Review and Recommendation A significant portion of the sewer rate revenue requirement consists of the WASD charges for sewer treatment which has increased by six percent or approximately$3 million and DERM fees of approximately $400,000. The debt service is also proposed to increase by $2.5 million. Similar to the water rate, the revenue requirements will be met utilizing a base facility charge which will serve as the monthly minimum service charge, a consumption charge, and WASD pass through charges. Based on the rate determination methodology established, PRMG also recommends the City should increase the wastewater wholesale rates charged to the Village of Bal Harbour, the Town of Bay Harbor Islands, and the Town of Surfside (collectively, the "Satellite Cities") from $3.1050 to$3.2705 per 1,000 gallons of service effective October 1, 2016. Typical Proposed Rate Comparison 3/4"-Meter Residential Customer-Domestic Fiscal Year Fiscal Year 2016 2017 Difference Water Rates Minimum Service Charge/'Base Facility Charge$22.15 $7.82 Page 180 of 69Z age 438 of 1707 Consumption Charge per 1,000 Gallons 0 to 4,000 Gallons $0.00 $0.63 [1] 4,001 to 5,000 Gallons 0.00 1.42 [1] 5,001 to 8,000 Gallons 4.61 1.42 [1] 8,001 to 16,000 Gallons 4.61 2.21 [1] 16,001 to 24,000 Gallons 4.61, 2.99 [1] Over 24,000 Gallons 4.61 3.78 [1] Purchased Water Pass-Through Rate per 1,000 Gallons (All Usage) $1.93 [1] Wastewater Rates Base Facility Charge N/A $8.45 Consumption Charge per 1,000 Gallons (All Flow) All Flow per 1,000 Gallons $8.23 $4.26 [2] Purchased Sewer Pass-Through Rate per N/A $4.76 [2J 1,000 Gallons (All Flow) Bill Comparison Monthly Cost to 10,000 Gallon Customer Water $45.20 $39.74 ($5.46) Wastewater 82.30 98.65 16.35 Combined $127.50 $138.39 $10.89 Monthly Cost to 5,000 Gallon Customer Water $22.15 $21.41 ($0.74) Wastewater 41.15 53.55 12.40 Combined $63.30 $74.96 $11.66 Footnotes: [1]The water consumption charge per 1,000 gallons and purchased water pass- through rate per 1,000 gallons are additive [2]The wastewater consumption charge per 1,000 gallons and purchased sewer pass- through rate per 1,000 gallons are additive CONCLUSION The Administration recommends approving the Ordinance on Second Reading Public Hearing. KEY INTENDED OUTCOMES SUPPORTED Ensure Expenditure Trends Are Sustainable Over The Long Term Legislative Tracking Public Works Page 181 of 692 Page 439 of 1707 Sponsor Commissioner Ricky Arriola ATTACHMENTS: Description LI Ordinance Page 182 of 692 Page 440 of 1707 74f4%14#44fi .41111 • tgl, •., . " . ')• ky I _ - 71-41T.! : ' • - CITY OF MIAMI BEACH, FLORIDA WATER AND SEWER RATE STUDY ., Page 441 of 17 • 10/9/2020 Coversheet NEW BUSINESS 9. MIAMI BEACH COMMITTEE MEMORANDUM TO: Finance and Economic Resiliency Committee Members FROM: Jimmy L. Morales, City Manager DATE: February 28,2020 SUBJECT: DISCUSSION REGARDING A FINANCIAL PLAN FOR THE WATER AND SEWER SYSTEM MASTER PLAN HISTORY: Public infrastructure serves as the backbone of a well-run municipality. Typically, as infrastructure ages and the needs of a growing city expand, existing infrastructure requires rehabilitation and upgrades. Such is the case with the City's water and sewer utility. Recognizing the increasing need to strategically invest in the water and sewer utility, the Public Works Department tasked Hazen and Sawyer with developing a Water and Sewer Master Plan that prioritizes projects over 25 years. At its October 23, 2019 Sustainability and Resiliency Committee (SRC) meeting, Public Works staff provided the members of the Committee a progress update on the Water and Sewer Master Plan.The Administration stated it has reviewed the plan and is ready for the Finance and Economic Resiliency Committee (FERC) (formerly the Finance and Citywide Projects Committee) for review and to further discuss a financing plan. The SRC Committee made a motion to refer the Water and Sewer System Master Plan to the FERC to identify funding sources. ANALYSIS: The proposed five year critical needs capital plan for the City's water and wastewater system is summarized below. Capital Project PROJECT TITLE FY20 Est.Cost FY21 Est.Cost FY22 Est.Cost FY23 Est.Cost FY24 Est.Cost Total Water&Wastewater Mains and Rehab $ 16,093,000 $ 10,277,855 $ 14,214,469 $ 15,441,872 $ 15,268,653 $ 71,295,848 Water Pump Station Improvements $ 5,592,900 $ 4,710,396 $ 10,303,296 Wastewater Stations Rehab. $ 11,103,400 $ 5,209,019 $ 16,312,419 Valve Assessment&Replacement Program $ 900,000 5 927,000 $ 954,810 S 2,781,810 Sewer Pump Station Odor Control $ 850,600 $ B5D,600 SCADA&PLC(W&S only) $ 1,625,250 $ 1.625,250 Wastewater Manhole Rehab. $ 1,500,000 $ 1,545,000 $ 1,591,350 $ 1,639,091 $ 1,688,263 $ 7,963,704 Water Meter Replacement $ 11,104,893 $ 11,104,893 TOTAL $ 122,237,819 This plan reflects the utility's needs as defined by the Water and Sewer Master Plans and internal renewal and replacement plans. As seen above,the plan accounts for an investment of$122.3 Million, of which approximately$37.5 Million is funded.An additional $24 Million of unencumbered water and sewer bond funds have been identified. If these funds were appropriated toward the proposed five year critical needs capital plan,there would remain a funding gap of approximately$61 Million. When planning the sequencing of projects, staff often takes into account work within the projects' proximity and, when beneficial, projects are grouped into larger neighborhood jobs.Approximately$37 Million of the overall$122.3 Million plan have been identified as independent projects. Independent projects generally include aerial pipe crossings, subaqueous pipelines, or other work that lies outside neighborhood boundaries. Thus, some projects within the Water and Sewer Critical Needs Five Year Capital Plan may fall within the boundaries of possible neighborhood jobs. However, due to the criticality of these projects, the Administration may proceed with their design and/or construction prior to the start of a neighborhood job. It is important to note that this plan only includes the critical needs defined in the Water and Sewer Master Plans and does not encompass general water and sewer work, which may occur as part of the City's neighborhood jobs.The cost and scope of water and sewer work within neighborhood jobs will be quantified upon completion of the Jacobs Engineering Neighborhood Priority List. In order to facilitate further discussion, the Water and Sewer Five Year Priority Lists are attached herein. Within the lists, a column Page 442 of 1707 https://miamibeach.novusagenda.com/agendapublic/CoverSheet.aspx?ItemID=162498MeetingID=804 1/2 10/9/2020 Coversheet identifies which projects are independent from larger neighborhood jobs. The estimates presented herein are for planning and budgeting purposes;the actual costs will be determined when the projects are fully designed and bid. Regionally there is a growing need to reinvest in utility infrastructure. The failure to reinvest in utility infrastructure has resulted in neighboring communities having had numerous water main breaks and sewerage spills resulting in one community being fined$1.8 million by state regulators.These projects are needed to reduce the risk of similar events happening in the City of Miami Beach. CONCLUSION: The Administration recommends approval of the five-year critical needs capital plan for the City's water and wastewater system,and approval of the$24 Million available from bond proceeds.Additionally,the Administration recommends commencing a rate study of the water and wastewater utility to determine financial capacity for the water and wastewater work associated with the Jacobs Engineering neighborhood prioritization and the remaining$61 Million dollars of critical needs. Applicable Area Citywide is this a"Residents Right to Does this item utilize G.O. Kno "item,_pursuant to Bond Funds? CCS Code Section 2-14? Yes No ATTACHMENTS: Description Type ❑ Water and Sewer System priority lists Other Page 443 of 1707 https://miamibeach.novusagenda.com/agendapublic/CoverSheet.aspx?ItemID=162498MeetinglD=804 2/2 DIRECTION: Come back to the May 22, 2020 FERC meeting with an update. NEW BUSINESS 8. PROPOSED ORDINANCE TO GOVERN CITY'S APPROVAL OF MASS TRANSIT FIXED GUIDEWAY PROJECTS October 16, 2019 —R5 Q Sponsored by Mayor Gelber Office of the City Attorney ACTION DIRECTION: Item withdrawn by sponsor. 9. DISCUSSION REGARDING A FINANCIAL PLAN FOR THE WATER AND SEWER SYSTEM MASTER PLAN January 15, 2020— C4 A Public Works ACTION Roy Coley, Public Works Director, presented the item. He explained that recently the Public Works Department supported by our consultant Hazen and Sawyer has developed a water and wastewater system master plan.That plan included a complete mapping of our system, developing hydraulic models of our water and wastewater and an assessment of the condition of our system components. That assessment was developed both by using age techniques and visual inspection. They have ultimately delivered a 25-year master plan to us. More importantly the consultant helped us to develop a 5-year plan of critical components that must be addressed. The reason they are calling them critical components is that they are components due to their age or actual condition and are at a higher likelihood of failure. He went through the presentation about the 5-year plan and talked about the sewer critical needs and water system critical needs. He explained that from their professional opinions the needs are not want to do's, they are must do's. If we don't do these items, we will have a higher risk of catastrophic failures such as Fort Lauderdale is experiencing. He explained they are asking the Committee to authorize the unallocated portion of our water and sewer bond money from 2017 towards these efforts. There is roughly$24 million that has not been allocated for anything else. We already had a substantial amount of money set aside for these needs because as we have been developing this plan with Hazen and Sawyer we have been setting aside money. Staff is asking to allocate the rest of the money towards this plan and authorize them to reach out to the rate consultants to help determine what the current rate structure will support in financial capacity to raise additional funds because we are still going to be about$61 million short, if the Committee authorizes everything been asked for today. We will have enough money to proceed until about 2021 if the Committee authorizes everything being asked for today, we will have to raise money going into 2022 to be on track. He pointed out that the dollar amount presented was developed during planning phases, none of this work has been designed yet and certainly don't have bids for it, he asked the Committee to view these numbers as planning level estimates that are likely to be higher or lower depending on the conditions they find. Commissioner Samuelian said they heard this at the Land Use and Sustainability Committee and gave a favorable recommendation. Some of it is just absolutely must do work. He asked if we have ever done anything like this before. Roy Coley said he is not aware of it, but in the last 5 years that he has been with the City we have spent about $50 million on water and sewer needs as we have been working on our neighborhood improvement projects. The plan was at that time was that we would do the improvements as we went neighborhood to neighborhood and a big portion of this is that we have to attack this whether we go into the neighborhoods or not. • Page UU4)643T07 Commissioner Samuelian said we have to do this, and we are doing a little bit of catch up from previous decades. He is supportive of staffs recommendation, his only request is that if and when we move forward a little bit around timing, as the next version comes he would like to know about specific start dates, our best estimates of end dates, and then some periodic reporting maybe to this Committee or Land Use quarterly and after a few rounds give an update by LTC. He thinks we need to get on with this and we need to move as expeditiously as possible. Commissioner Richardson mentioned that he noticed several items on the list are for 2020. He asked if those are included in the current 2020 budget. Roy Coley said they are either funded in this year or partially funded. The Commission also approved 1 or 2 months ago an odor control system as part of the wastewater system. So many of them are funded in this year's budget. John Woodruff, Chief Financial Officer, said he would meet with Roy Coley and go through the items in detail and determine which ones we have funding for and which ones are eligible for the bonds funds and then prepare a budget amendment if there was a need to, to move some money around to match the latest schedule. In 2017, we went out with a big water and sewer bond for about $80 million, there is an unspent amount there. They can go through that and make sure we can utilize those funds. They will double check everything and be able to go back to Commission if needed. Roy Coley reiterated that staff is looking for the Committee's favorable recommendation to the Commission as a whole to authorize the use of the uncommitted bond funds towards this critical plan, roughly$24 million. Commissioner Richardson said he is okay with it but would like John Woodruff to go through the projects and when this goes back to the Commission, they would like to know that the projects that are going to utilize that money are authorized. John Woodruff said that would be the first step, to make sure all of our bond documents, whatever we committed to in there is consistent with that. They are usually written broad enough so he is pretty optimistic about that. Second, there are some water and sewer projects that we would try to time with the stormwater underground projects as well. What this does is in theory if that project prioritization takes a little longer, we are going to prioritize this first. If we need to commit more funds toward the stormwater related projects, we may have to speed up a rate increase a little faster than we otherwise would. Roy Coley said Hazen and Sawyer was also our engineer for that water and sewer bond, they provided the engineers report for the 2017 bond, they also built this plan, so if there are any questions on that we would reach out to them and ask them to opine on that appropriateness because they are already familiar with both requirements. He also mentioned that 100% of this is playing catch up, we have been spending the last few years chasing what we thought were emergency conditions that were nonstop. All of these are probably things that should have been addressed over the last decade. Staff will try to bring this to the March Commission meeting, if not the April Commission meeting. Commissioner Samuelian confirmed that it sounds like they have consensus on the $24 million, we will investigate the rate for the remaining gap. He reiterated that on the next iteration he would like start dates, end dates, some periodic reporting. MOTION: Commissioner Samuelian moved the item as recommended by the Administration. Commissioner Richardson seconded. All in favor. DIRECTION: Come back quarterly to the FERC meetings with updates. 10. DISCUSSION ON REVISIONS TO THE EVENT SPONSORSHIP GUIDELINES September 11, 2019— C4 A Tourism and Culture Page 445 bf 5707 RESOLUTION NO, 2020-31211 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ACCEPTING THE RECOMMENDATION OF THE FINANCE AND ECONOMIC RESILIENCY COMMITTEE AT ITS FEBRUARY 28, 2020 MEETING, TO ACCEPT THE FIVE-YEAR CRITICAL NEEDS CAPITAL PLAN FOR THE CITY'S WATER AND WASTEWATER SYSTEM, TO APPROVE THE USE OF THE $24 MILLION AVAILABLE FROM BOND PROCEEDS, AND TO COMMENCE A RATE STUDY OF THE WATER AND WASTEWATER UTILITY TO DETERMINE FINANCIAL CAPACITY FOR THE WATER AND WASTEWATER WORK ASSOCIATED WITH THE JACOBS ENGINEERING NEIGHBORHOOD PRIORITIZATION AND THE REMAINING $61 MILLION DOLLARS OF CRITICAL NEEDS. • WHEREAS, public infrastructure serves as the backbone of a well-run municipality, and typically, as infrastructure ages and the needs of a growing city expand, existing infrastructure requires rehabilitation and upgrades; and WHEREAS, the failure to reinvest in utility infrastructure has resulted in neighboring communities having had numerous water main breaks and sewerage spills resulting in one community being fined $1.8 million by state regulators; and WHEREAS, recognizing the increasing need to strategically invest in the water and sewer utility, the Public Works Department tasked Hazen and Sawyer with developing a Water and Sewer Master Plan that prioritizes projects over 25 years; and WHEREAS, at its October 23, 2019 Sustainability and Resiliency Committee ("SRC") meeting, Public Works staff presented to the Committee a progress update on the Water and Sewer Master Plan (the "Master Plan"); and WHEREAS, the staff stated it has reviewed the Master Plan and was ready for the Finance and Economic Resiliency Committee ("FERC") (formerly the Finance and Citywide Projects Committee)to review and to further discuss a financing plan; and WHEREAS, the SRC Committee made a motion to refer the Master Plan to the FERC to identify funding sources; and WHEREAS, the Master Plan reflects the utility's needs as defined by the Water and Sewer Master Plans and internal renewal and replacement plans; and WHEREAS, the plan accounts for an investment of $122.3 million, of which approximately $37.5 million is already funded; and Page 446 of 1707 WHEREAS, an additional $24 million of unencumbered water and sewer bond funds have been identified — if these funds were appropriated toward the proposed five- year critical needs capital plan, there would remain a funding gap of approximately $61 million; and WHEREAS, when planning the sequencing of projects, staff often takes into account work within the projects' proximity and, when beneficial, projects are grouped into larger neighborhood jobs; and WHEREAS, approximately $37 million of the overall $122.3 million plan have been identified as independent projects -- independent projects generally include aerial pipe crossings, subaqueous pipelines, or other work that lies outside neighborhood boundaries; and WHEREAS, thus, some projects within the Water and Sewer Critical Needs Five Year Capital Plan may fall within the boundaries of possible neighborhood jobs; and WHEREAS, however, due to the criticality of these projects, the Administration may proceed with their design and/or construction prior to the start of a neighborhood job; and WHEREAS, it is important to note that this plan only includes the critical needs defined in the Master Plan and does not encompass general water and sewer work, which may occur as part of the City's neighborhood jobs; and WHEREAS, the cost and scope of water and sewer work within neighborhood jobs will be quantified upon completion of the Jacobs Engineering Neighborhood Priority List; and WHEREAS, in order to facilitate further discussion, the Water and Sewer Five Year Priority Lists were presented to the FERC at its February 28, 2020 meeting, and within the lists, a column identified which projects are independent from larger neighborhood jobs; and WHEREAS, the estimates presented were for planning and budgeting purposes; the actual costs will be determined when the projects are fully designed and bid; and WHEREAS, FERC made a motion to proceed to the City Commission to seek acceptance of the five-year critical needs capital plan for the City's water and wastewater system, and approval of the$24 million available from bond proceeds subject to a future appropriation; and WHEREAS, additionally, FERC recommended commencing a rate study of the water and wastewater utility to determine financial capacity for the water and wastewater Page 447 of 1707 • work associated with the Jacobs Engineering neighborhood prioritization and the remaining $61 million dollars of critical needs. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby accept the recommendation of the Finance and Economic Resiliency Committee at its February 28, 2020 meeting, to accept the five-year critical needs capital plan for the City's water and wastewater system, to approve the use of the $24 million available from bond proceeds, and to commence a rate study of the water and wastewater utility to determine financial capacity for the water and wastewater work associated with the Jacobs Engineering Neighborhood Prioritization and the remaining $61 million dollars of critical needs. PASSED and ADOPTED this /1 day of Arch, , 2020. DAN GELBER, MAYOR ATT§8-1F:e RA AEL E. G A O, CITY CLERK :: INCORPORATED ' '�.�' `fid• • APPROVED AS TO FORM & LANGUAGE &FOR EXECUTION • 634.„p —� _ it_ to City Atto Date Page 448 of 1707 Resolutions-C7 V MIAMI BEACH COMMISSION MEMORANDUM TO: Honorable Mayor and Members of the City Commission FROM: Jimmy L. Morales, City Manager DATE: March 18,2020 SUBJECT:A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ACCEPTING THE RECOMMENDATION OF THE FINANCE AND ECONOMIC RESILIENCY COMMITTEE AT ITS FEBRUARY 28, 2020 MEETING, TO ACCEPT THE FIVE-YEAR CRITICAL NEEDS CAPITAL PLAN FOR THE CITY'S WATER AND WASTEWATER SYSTEM, APPROVE THE USE OF THE $24 MILLION AVAILABLE FROM BOND PROCEEDS;AND TO COMMENCE A RATE STUDY OF THE WATER AND WASTEWATER UTILITY TO DETERMINE FINANCIAL CAPACITY FOR THE WATER AND WASTEWATER WORK ASSOCIATED WITH THE JACOBS ENGINEERING NEIGHBORHOOD PRIORITIZATION AND THE REMAINING$61 MILLION DOLLARS OF CRITICAL NEEDS. RECOMMENDATION The Administration recommends acceptance of the five-year critical needs capital plan for the City's water and wastewater system, and approval of the $24 Million available from bond proceeds, subject to a future appropriation. Additionally, the Administration recommends commencing a rate study of the water and wastewater utility to determine financial capacity for the water and wastewater work associated with the Jacobs Engineering neighborhood prioritization and the remaining $61 Million dollars of critical needs. BACKGROUND/HISTORY Public infrastructure serves as the backbone of a well-run municipality. Typically, as infrastructure ages and the needs of a growing city expand, existing infrastructure requires rehabilitation and upgrades. Such is the case with the City's water and sewer utility. Recognizing the increasing need to strategically invest in the water and sewer utility, the Public Works Department tasked Hazen and Sawyer with developing a Water and Sewer Master Plan that prioritizes projects over 25 years. At its October 23, 2019 Sustainability and Resiliency Committee (SRC) meeting, Public Works staff provided the members of the Committee a progress update on the Water and Sewer Master Plan. The Administration stated it has reviewed the plan and was ready for the Finance and Economic Resiliency Committee (FERC) (formerly the Finance and Citywide Projects Page 545 of 1097 Page 449 of 1707 Committee)for review and to further discuss a financing plan. The SRC Committee made a motion to refer the Water and Sewer System Master Plan to the FERC to identify funding sources. ANALYSIS The proposed five year critical needs capital plan for the City's water and wastewater system is summarized below. Capital Project PROJECT TITLE FY20 Est.Cost FY21 Est.Cost FY22 Est.Cost FY23 Est Cost FY24 Est.Cost Total Water&Wastewater Mains and Rehab $ 16,093,000•$ 10,277,855 i$ 14,214,469,$ 15,441,872 i$ 15,268,653 $ 71,295,848 Water Pump Station Improvements $ 5,592,900($ 4,710,396 l$ 10,303,296 Wastewater Stations Rehab. •• Valve Assessment&Replacement Program I {$ 11,103,400 i$ 5,209,019 $ 16,312,419 ! $ 900,000 $ 927,000 $ 954,810• $ 2,781.810 Sewer Pump Station Odor Control $ 850,600 I i $ 850,600 SCADA&PLC(W&S only) • $ 1,625,250 I$ 1,625,250 Wastewater Manhole Rehab. II 1$ 1,500,000'$ 1,545,000. $ 1,591,350 i$ 1,639,091 $ 1,688,263'$ 7,963,704 Water Meter Replacement I$ 11,104,893 I $ 11,104,893 TOTAL $ 122,237,819 This plan reflects the utility's needs as defined by the Water and Sewer Master Plans and internal renewal and replacement plans. As seen above, the plan accounts for an investment of$122.3 Million, of which approximately $37.5 Million is funded. An additional $24 Million of unencumbered water and sewer bond funds have been identified. If these funds were appropriated toward the proposed five year critical needs capital plan, there would remain a funding gap of approximately$61 Million. When planning the sequencing of projects, staff often takes into account work within the projects' proximity and, when beneficial, projects are grouped into larger neighborhood jobs. Approximately$37 Million of the overall $122.3 Million plan have been identified as independent projects. Independent projects generally include aerial pipe crossings, subaqueous pipelines, or other work that lies outside neighborhood boundaries. Thus, some projects within the Water and Sewer Critical Needs Five Year Capital Plan may fall within the boundaries of possible neighborhood jobs. However, due to the criticality of these projects, the Administration may proceed with their design and/or construction prior to the start of a neighborhood job. It is important to note that this plan only includes the critical needs defined in the Water and Sewer Master Plans and does not encompass general water and sewer work, which may occur as'part of the City's neighborhood jobs. The cost and scope of water and sewer work within neighborhood jobs will be quantified upon completion of the Jacobs Engineering Neighborhood Priority List. Page 546 of 1097 Page 450 of 1707 In order to facilitate further discussion,the Water and Sewer Five Year Priority Lists are attached herein. Within the lists, a column identifies which projects are independent from larger neighborhood jobs. The estimates presented herein are for planning and budgeting purposes;the actual costs will be determined when the projects are fully designed and bid. Regionally there is a growing need to reinvest in utility infrastructure. The failure to reinvest in utility infrastructure has resulted in neighboring communities having had numerous water main breaks and sewerage spills resulting in one community being fined $1.8 million by state regulators. These projects are needed to reduce the risk of similar events happening in the City of Miami Beach. At its February 28, 2020 meeting, the Finance and Economic Resiliency Committee made a motion to proceed to the full Commission to seek acceptance•of the five-year critical needs capital plan for the City's water and wastewater system, and approval of the $24 Million available from bond proceeds subject to a future appropriation.Additionally,the Committee recommended commencing a rate study of the water and wastewater utility to determine financial capacity for the water and wastewater work associated with the Jacobs Engineering neighborhood prioritization and the remaining$61 Million dollars of critical needs. CONCLUSION The Administration recommends accepting the recommendation and adoption of the Resolution. Applicable Area Citywide Is this a"Residents Right Does this item utilize G.O. to Know"item,pursuant to Bond Funds? City Code Section 2-14? Yes No Legislative Tracking Public Works ATTACHMENTS: Description o Water and Sewer System priority lists • Page 547 of 1097 Page 451 of 1707 • Water System Critical Needs Priority List • Independent Project time Project location Begin Date Total W-2 Booster Station Piping Rehabilitation ✓ . 75th Street and Dickens Ave 2020 $ 1.200,000.00 ii Replacement of WM aerial crossings Venetian Isles I Venetian Isles 2020 S 4.420,000.00 Rehabilitation of WM aerial crossings ors MacArthur I MacArthur Bridge 2020 S 2.271.478.00( Water Main PoF/CoF Priority 1 30-Inch FM Alton Rd and 41st St.,others.TB0 2020 525,127,797.70• 10th Street between Lenox Ave and Washington ,Fire Flow Project 1 Ave. 2020 5 520,000.00 I Fire Flow Protect 3 Meridian Ave and 13th Street 2020 $ 250,000.00 Fire Flow Project5 locations vary 2020 S 150,000.00E Meter Replacement ✓ ,City Wide 2020 511,104,893.40• Valve Assessment and Replacement Program City Wide 2020 S 1.081.813.00 WaterSCADA / City Wide 2020 $ 406,312.50 Fire How Project 7 Locations vary, ; 2021 :$ 72,100.00 Fire Flow Project 13 _. _ Michigan and 7th Ave 2021 S 484,100.00' Fire How Protect 16 Alton Rd.and Michigan Ave 2021 5 63&600.00 Fire Flow Project17 / Terminal Island 2021 S 175,100.00 l Construction of New Booster Station North Beach 2021 S 5,592,900.00 Aerial Crossing Water Main Replacement I 41st Street between Meridian Ave and Chase Ave 2021 $ 72,100.001 / Aerial Crossing Water Main Replacement 41st Street between Pine Tree Dr and Indian Creek 2021 $ 206,000.00 Aeri al Crossing Water Main Replacement / 71st Street and Bonita Dr. 2021 $ 185,400.00 Water Main on MacArthur Causeway I MacArthur Causeway 7022 5 4105,683.00 Belle Isle Booster Station Rehabilitation / Belle Isle 2022 $ 4,710,396.00 Fire Flow Project 2 West Ave and Flamingo 2022 5 456.187.00 j Fire Flow Project 4 _ Euclid and 14th PI 2022 $ 169,744.00 Fire Flow Project 15 Euclid and 14th Street 2022 S 307,66100 Fire Flow Project6 Collins Park 2023 $ 98,345.43 Fire Flow Prolect$ Meridian and 15th Street 2023 5 131.127.24 Fire Flow Project 10 20th Street and Collins Ave 2023 S 87,418.16' Fire Flow Project Il _18th Street and Collins Ave 2023 S 109,272.701 Fire Flow Project 12 Collins and 27th Street 2024 S 87,418.16 Fire Flow Project 9 N.Bay Rd between 41st and 43rd St 2024 S 821.621431 Fire Flow Project 14 North Beach,Varies 2024 $ 855,386.70' Tota)Water $65.898.857.41 • Sewer System Critical Needs Priority List Independent Project Name Project lactation Begin Date Total Gravity Main Replacement-Priority 1 .Basin 18(La Gorce Island),others TBD 2020 $ 4,916,259.76 Gravity twins I/i Reduction-Priority 1(a) 04(Hibiscus),0S(Palm),02(Star),others TBD 2020 $ 2.255.357.00 Venetian Way aerial crossing replacement in kind i Venetian Causeway 2020 $ 770,01C.CO Valve assessment and replacement CityWide 2020 $ 1,®9,935.00 Pump Station No.2force main replacement I rump Island to 10th Street and West Ave. 2020 $ 2,550,00000 Force Mains PoF/CoF Priority 1 Terminal to Star Island,Normandy Isles.other TBD 2020 S 9,813.027.17 Pump Station No.18 farce main replacement La Gorce Island 2020 $ •550,000.00 lodorcontrol System i ✓ Varies 2020 S 950.600.00 SewerSCADA ✓ City Wide 2020 $ 1.218,937.50 Manhole Inspection and rehabilitation City Wide 2020 5 7.963,703.72 Pump Station 6,7 and 8 rerouting Belle Isle 2021 5 1,194,800.00 Aerial crossing Pine Tree Drive 51st Street to 47th St. ✓ Pine Tree Drive 2021 $ 700400.00 Pump Station No.28 Rehabilitation 28th Street and Pine Tree 2021. $1L103,400.00 Pump Station No.I Rehabilitation 11th Street 2022 $ 3,140,264.00 Pump Station No.30,well lining,and electrical upgrades ✓ Terminal Island 2022 $ 2,068,755.00 Pump Station No.4 force main replacementBetween Palm and Hiibisais Island 2022 5 477,405.00 Pump Stations No.5 force main replacement Palm Island 2022 $ 413,751'D0 Pump Station No.14 force main replacement Sunset island 3 2022 5 901.765.00 Pump Station No.23 face main replacement 75th Street and Dickens Ave 2022 5 53,045.00 Pump Station No.27 force main replacement Collins Ave and 52nd Street 7022 5 53,015.00 Gravity Mains I/I Reduction-Priority 1(b) Basin 23,other TBD 2023 S 3,643.452.32 (Totet Sewer $563 38,962.47 • Page 548 of 1097 Page 452 of 1707 RESOLUTION NO.' 2014-28830 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ACCEPTING THE RECOMMENDATION OF THE CITY MANAGER TO REJECT ALL PROPOSALS RECEIVED, PURSUANT TO REQUEST FOR PROPOSAL (RFP) NO. 2014-091-SW, FOR INVESTMENT ADVISORY SERVICES, AND AUTHORIZING THE ADMINISTRATION TO RELEASE AN INVITATION TO NEGOTIATE (ITN) FOR INVESTMENT ADVISORY SERVICES. WHEREAS, on May 21, 2014, the Mayor and City Commission approved Resolution No. 2014-28587 (the "Resolution") accepting the recommendation of the City Manager pertaining to the ranking of proposals, pursuant to Request for Proposals (RFP) No. 2014-091-SW for Investment Advisory Services, and authorized the Administration to enter into negotiations with the top-ranked proposer, First Southwest and, should the Administration not be successful in negotiating an agreement with the top-ranked proposer, authorized negotiations with the tied second-ranked proposers, Davidson Fixed Income Management and Public Trust Advisors, LLC; and WHEREAS, following approval of the Resolution, the City's Finance Department attempted to negotiate an agreement with the top-ranked proposer, First Southwest; and WHEREAS, the parties were unable to come to mutual agreement with regard to the fees to be paid by the City under the agreement; and WHEREAS, prior to initiating negotiations with the second-ranked proposers, it became apparent that since the issuance of the RFP the amount of City investments to be managed is expected to increase significantly; and WHEREAS, this would significantly affect the City's ability to negotiate a cost-effective agreement for investment advisor services under the current RFP; and WHEREAS, the proposals received pursuant to the RFP did not consider that the amount of the stated investments to be managed did not reflect the significant capital financing now planned for FY2014/15, FY2015/16, and FY2016/17, which is expected to surpass one billion dollars; and WHEREAS, the Administration also believes it is important to provide an opportunity for proposers, through a competitive solicitation process, to offer value added services which could reduce City cost, or provide additional services and efficiencies to the City given the now planned investments for FY2014/15, FY2015/16, and FY2016/17; and WHEREAS, to that end, the Administration recommends terminating negotiations and rejecting all proposals under the current RFP process and allow the Administration to revise the scope of services to be included in a future solicitation to include the City's planned investments, as well as incorporate an opportunity for proposers to provide value added services to the City; and WHEREAS, following the rejection of proposals and termination of the current RFP process, the Administration recommends releasing a subsequent Invitation to Negotiate (ITN), which will provide the City the opportunity to negotiate with multiple firms simultaneously. Page 453 of 1707 NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby accept the recommendation of the City Manager to reject all proposals received, pursuant to Request For Proposal (RFP) No. 2014-091-SW, for investment advisory services, and authorize the Administration to release an Invitation To Negotiate (ITN) for investment advisory services. PASSED AND ADOPTED this 19th day of November, 2014. ATTEST: /A • NI\\ LE IN a ? 'it DR- P�RATED/ ' • 'AEL E. GRANA O, ClCI C 4, TAAGENDA\20141NovembertProcurement1RF- '�h :.Jr.c " - Investment Advisory Services Reject-RESOLUTION.doc • APPROVED AS TO FORM&LANGUAGE &FOR EXECUTION 1i (3 \14- City Atto ey Date Page 454 of 1707 ORDINANCE NO. 2020- AN ORDINANCE OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, AMENDING CHAPTER 110 OF THE CODE OF THE CITY OF MIAMI BEACH ENTITLED "UTILITIES," ARTICLE IV, ENTITLED "FEES, CHARGES, RATES AND BILLING PROCEDURE," BY AMENDING SECTION 110-166 THEREOF, ENTITLED "SCHEDULE OF MONTHLY WATER USER RATES AND TAPPING CHARGES;" BY AMENDING SECTION 110-168 THEREOF, ENTITLED "SCHEDULE OF MONTHLY SANITARY SEWER USER RATES" ARE TO BE AMENDED; AND BY AMENDING SECTION 110- 171 THEREOF, ENTITLED "RATE INDEXING," IN ORDER TO ADJUST AND MODIFY HOW WATER AND SANITARY SEWER RATES ARE CALCULATED AND APPLIED; AND FURTHER,AMENDING APPENDIX A OF THE CITY CODE, ENTITLED "FEE SCHEDULE," TO INCREASE THE WATER RATES AND SANITARY SEWER SERVICE CHARGES IMPOSED BY THE CITY PURSUANT TO SECTIONS. 110-166, 110-168, 110-171, AND APPENDIX A; PROVIDING FOR CODIFICATION; REPEALER; SEVERABILITY; AND AN EFFECTIVE DATE. WHEREAS, Chapter 110, of the Code of the City of Miami Beach, entitled "Utilities" and Appendix A to Chapter 110 establish the City's potable water rates for all water users and the sanitary sewer rates for all sanitary sewer users except sewer rates for wholesale customers established through contract; and WHEREAS, the City's utility rates for water and sanitary sewer services are structured to collect the necessary revenues to meet annual operating and maintenance costs of the water and sanitary sewer infrastructure, to cover debt service for water and sewer bonds, to fund capital improvements to the City's utility system infrastructure, maintain adequate operating fund and capital reserves, and to pay Miami-Dade County Water and Sewer Department (WASD) for wholesale water purchased and for the treatment of the collected City sewage; and WHEREAS, the City and its consulting engineers recently completed master plans for 'the water and sewer systems that identified critical capital projects to be completed over the next several years; and WHEREAS, WASD has historically raised the rates for wholesale water and sanitary sewer to recover its cost of providing service and it is anticipated by WASD that it will continue to raise the rates for service due operating expenditures and debt service increases and the need to fund future capital improvements; and Page 455 of 1707 WHEREAS, through a formal procurement process, the City retained the firm of GovRates, Inc. (GovRates) to assist in the determination of revised water and sanitary sewer rates in order to meet the projected expenditure and funding needs of the City's utility system over the next ten years;and WHEREAS, GovRates has recommended revised rates to recover the cost of service and promote the overall sustainability of the utility system; provide the ability to adjust rates due to changes in the cost of wholesale water and wastewater service as provided by WASD; and provide the ability to index the rates for inflation and other expenses to provide utility operating margins to fund capital improvements and the repayment of debt issued by the City in support of the funding of capital improvements; and WHEREAS, the financial and rate plan proposed by GovRates recognizes the refunding the City's outstanding Series 2010 Bonds and the issuance of additional bonds in a few years; and WHEREAS, the City adopted Resolution No. 95-21585, as amended and supplemented from time to time, which authorized the issuance of utility revenue bonds to finance capital improvements to the utility system (hereinafter the "System") which included a requirement that the revenues of the System shall at all times meet the rate covenant requirements as delineated in such resolution for the protection of the bondholders; and WHEREAS, when the City issues new debt to finance critical capital needs, bond rating agencies expect that all rates needed to pay the debt have already been adopted; and WHEREAS, in order to properly fund the City's water and sewer program, the City seeks to amend Chapter 110 and Appendix A to codify the GovRates recommendations; and WHEREAS, the GovRates recommendations recognize the need to increase combined water and sewer user rate revenues by 2.4%, 2.3%, 2.3%, 2.3%, 2.3% for the fiscal years 2021, 2022, 2023, 2024, and 2025 respectively, as well as to pass-through future WASD wholesale water and sewer rate increases beyond Fiscal Year 2021; and WHEREAS, as part of the rate design to recover the necessary revenue for each fiscal year, GovRates recommends improving the utility's revenue stability by gradually increasing the monthly water and sewer base charges over time to bring them in line with industry standards; and 2 Page 456 of 1707 WHEREAS, during the October 23, 2020 meeting of the Finance and Economic Resiliency Committee, the Committee recommended approval of the GovRates recommendations; and WHEREAS, the amendments set forth below are necessary to accomplish the above objectives. NOW THEREFORE, BE IT ORDAINED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH,FLORIDA: SECTION 1. That Chapter 110 of the Miami Beach City Code entitled "Utilities," Article IV, entitled "Fees, Charges, Rates and Billing procedure," at Section 110-166, entitled "Schedule of monthly water user rates and tapping charges;" Section 110-168, entitled "Schedule of monthly sanitary sewer user rates," and Section 110-171, entitled "Rate indexing" are hereby amended as follows: CHAPTER 110 UTILITIES ARTICLE IV. Fees, Charges, Rates and Billing Procedure. Sec. 110-166. - Schedule of monthly water user rates and tapping charges. (a) There is hereby imposed, upon alt premises within the city connected to or using the facilities of the city's potable water system, a monthly water user rate. Every premises connected to or using the facilities of the city's potable water system shall be billed monthly user rates consisting of: i) a base facility charge which serves as the monthly minimum service charge on each service installed, varying with and based upon the size of the meter installed in accordance with the rules of the public works department; ii) a water consumption charge; and iii) a purchased water pass-through adjustment rate to recover the cost of purchased wholesale water as billed by the Miami-Dade Water and Sewer Department (WASD). The monthly water user rates charged for service shall be in accordance with the consumer applicability provisions and the corresponding schedule set forth in Appendix A, as may be adjusted from time to time based on the provisions of the section. There shall not be a rental charge on meters. The monthly water user rates shall be charged to each individually metered water consumer each month in accordance with the following applicability provisions: (1) Individual Metered Residential Service - Applicable to all consumers that represent service to a residential dwelling unit that is individually metered for potable water service that is not classified as irrigation service. 3 Page 457 of 1707 (2) Master Metered Multifamily Residential Service -Applicable to all consumers that represent service to a residential dwelling units that is master-metered (more than one residential dwelling unit being served by the water meter measuring service to the premise) which would include, but not be limited to, condominiums, apartments, and duplexes, that are not classified as irrigation service. (3) Nonresidential Service - Applicable to all water customers that are not classified as individually metered residential service, master-metered residential service, or irrigation service which primarily represents service to commercial customers public authorities, and institutional customers. (4) Residential Irrigation Service - Applicable to all residential dwelling units that are individually metered for domestic water use (reference subsection 110-166 (a)(i)) and which have a separate meter for irrigation service or other similar water use. (5) Master Metered Multifamily Residential Irrigation Service - Applicable to all master metered residential customers that are individually metered for domestic use (reference subsection 110-166 (a)(ii)) and which have a separate meter for irrigation service or other similar water use. (6) Nonresidential Irrigation Service - Applicable to all customers classified as nonresidential that are individually metered for domestic use (reference subsection 110-166 (a)(ii)) and which have a separate meter for irrigation service or other similar water use. (b) To the extent practical, all water delivered to a consumer shall be metered and shall be billed the water consumption charge and the purchased water pass-through charge, which rate shall be prorated for each 100 gallons in the event of increments of less than 1,000 gallons for all consumers of water. With respect to the billing for water use, the water consumption rates and the purchased water pass-through rate as defined in this section may be added together for rate application or billing purposes on a consumer's bill, (c) Pass-Through of Purchased Wholesale Water Charges. The Purchased Water Pass- through Rate, which is applied to all water consumers being billed for potable water service, shall be increased or decreased by the city by applying a pass-through adjustment factor for any change in the average annual rates charged to the city for wholesale potable water purchased from WASD (the "Water Pass-Through Adjustment") to the Purchased Water Pass-through Rate charged by the city. (1) Adjustment schedule. The implementation of the adjustment to the Purchased Water Pass-Through Rate for any month that a change in wholesale potable water rates by WASD is effectuated ("Water Cost Recovery") shall occur without a public hearing. Water Cost Recovery shall be employed each time that WASD adjusts the average annual wholesale potable water rates that are billed to the city. Any adjustment to the Purchased Water Pass-Through Rate based on the determination of the change in wholesale rates shall be implemented in the month 4 Page 458 of 1707 immediately following the determination of the Purchased Water Pass-Through Adjustment. The Purchased Water Pass-Through Rate as shown on Appendix A and as may be further adjusted automatically in the future by the implementation of the provisions of this section and in Appendix A and which are then in effect shall be increased or decreased by the city by applying a Purchased Water Pass- through Adjustment established in accordance with this subsection and in Appendix A to the then effective Purchased Water Pass-Through Rate prior to such application. Nothing herein shall preclude the city from making additional changes to the monthly water user rates for service. (2) Applicability of Purchased Water Rates. The Purchased Water Pass-Through Rate shall be in addition to any water consumption rates for all retail and wholesale customers that are billed for potable water service by the city. The following are the customers that shall be subject to the application of the Purchased Water Pass-through Rate and shall be subject to the pass-through for changes in the cost of purchased water from WASD (the "Applicable Customers"): (i) The retail water customer classes that are billed the water consumption charge referenced in this section. (ii) All separate utilities or local governments that may receive wholesale potable water service provided by the city currently or in the future which is not considered as retail customers. (3) Calculation of Purchased Water Pass-Through Adjustment. The Purchased Water Pass-Through Adjustment shall be calculated using the formulas and methodology specified in Appendix PWPTA - ((IWWC PWWC) * (1/ (1 (DF + T + 0))) Where: - • - - - ' - - - - ' - - '_ • : _e - • - - -• - • - - " - - Purchased Water Pass through Rate to be applied the Applicable by WASD to the city that is added or subtracted, respectively to the charged by WASD expressed on a dollar per 1,000 gallons basis that 5 Page 459 of 1707 rate d ned-asthe 11 A� /1 C b9-the-Gity. e - ' - -- - revenues billed . •- - -- A • - ! .- • A - • ! - - -- e . - - - fe ing f� fGr-ula4 AD1A� =-�P^IPM/^^DTD + D\A/DTA Where 1 • r ? — .- At.% 1 A - • • F . - . - . - • - • . • .. - . A - - - - e •e . - • • i • l — • . F . ae1 _ . e _eA.•.. -•- - - •. . i . • . 1 - • . e .e . .. . . • - • A - • - - . • _ .. Fofffitiia Aceauat RefeFenee - - - • _ - :. ... _ T.• 4- PWAFWC $4-7350 - - ' _ • . , _ , _ _ _ e- 2 G $4,-77-00 . ... .: .. _...- - ` . 1))/ 2.02% Adjustments '' - .. .._• ._ •--• 4 9F $-80_% - 5 0 % —Other--Adjustments S 0:004/0 6 Page 460 of 1707 = - II - . • 4-06696 6={3 } 2.20°%, -e ` - - - - • -.e- - .. ,... - 9 PWPTR $4-93 - ' - ' •- - 10=9-`6 PWPTA $042 - e'. '- -- ` - - '- - --- - - - 'e' -. 11-9+10 APR $4-96 • • - -• , "t"._ . II - - - - • - - system, - „ _ „ rates for service. over (i) All increases or decreases in the percentage charge of tho Dement of 1,a „ - _ - •- -_ _ - _ _ . _ . - Pass-Threogh Factor shall—be PTF - ARRIER Where: 7 Page 461 of 1707 A " - L ! _ ! ..- _ system services as determined by the city. ER - The total actual revenues earned by the Enterprise System from the - - •• - - - determined based on the Pass Through Factor applied uniformly to the - . - • - - • - -- . PTR - (AR)(1 + PTF) Where: • .- • • 1" — • - • - - . _ . •.. .. - the Pass Through Factor. - . _ - e _ e - .. - - - ' - - - (e) On all water supply service, each month shall be a complete period in itself, and no excess consumption of water during one month shall be charged or be added to the consumption of any other month. (1) Exception. The provisions contained in this subsection (e) shall not apply to an owner or consumer of a single-family home that participates in the"budget billing" process of the utility billing system. The "budget billing" process allows owners or consumers to pay the same monthly amount for water and sewer consumption based on the average of the previous annual consumption history. If the variance in actual consumption becomes more than 50 percent of the annual consumption average, the budgeted amount would be recalculated or the budget billing would cease and regular billing would commence. To be eligible to use this "budget billing" feature, the owner and/or consumer would have to submit an application to the finance department for budget billing. After the approval of the finance department, the budget billing would commence and would only cease upon written request by the owner or consumer or the failure to pay the budget amount when the payment is due. (f) A monthly base facility charge as shown on Appendix A shall be billed to all privately owned fire-protection systems and equipment connected to the city water system in accordance with the size of the service line connecting the private system to the city's system. All costs of providing fire sprinkler service, including the service lateral, meter vault and detector check meter shall be the applicant's responsibility. If any consumer shall connect any appurtenance other than sprinkler heads to a fire service line, that consumer shall pay all connection-related charges set out in this section and the monthly water service charges identified in this section regarding service to customers delineated under the general service designation. 8 Page 462 of 1707 (g) Upon the application of the owner or consumer for water service on the premises to which there has not been made any previous service for water, the tapping charges as specified in appendix A shall be made to cover the cost of the tap and the installation of the service to the property line of the lot to be supplied with water service. (h) Every owner or consumer making an application for water service shall be required to make a deposit with the public works department called a guarantee of payment deposit. The amount of such deposit shall be according to the size of the service, as specified in appendix A. If the owner or consumer making such deposit wishes the service to be discontinued, the guarantee of payment deposit shall be refunded less outstanding charges for water, sewer, stormwater or garbage and waste. If at any time the total service charges for a given account exceed the amount of the deposit, the city reserves the right to demand an additional deposit up to four times the amount of any previous monthly bill on that service. (i) A request by the owner or consumer to have the water meter re-read for validation of the correctness of a meter reading will result in a fee in accordance with the schedule set forth in appendix A. This fee will be charged only if the re-read validates the accuracy of the reading in question. (j) A request by the owner or consumer to have a special water meter read at a time other than a normally scheduled read date as set by the utility will result in a fee in accordance with the schedule set forth in appendix A. (k) Meter/meter equipment and City of Miami Beach utility property servicing a premises found damaged, destroyed or missing will be charged to the owner or consumer in accordance with the schedule set forth in appendix A. (I) A request by the owner or consumer to have a field visit by a technician. This fee will be charged only if the technician finds that the problem/issue is not that of the utility. Sec. 110-168. - Schedule of monthly sanitary sewer user rates. (a) There is hereby imposed, upon all premises within the city connected to or using the facilities of the city's sanitary sewer system, a monthly sanitary sewer user rate. Every premises connected to or using the facilities of the city's sanitary sewer system shall be billed monthly user rates consisting of: (1) A base facility charge which serves as the monthly minimum service charge on each service installed, varying with and based upon the size of the meter installed in accordance with the rules of the public works department; (2) A sanitary sewer consumption charge; and (3) Purchased sanitary sewer pass-through adjustment rate to recover the cost of purchased wastewater treatment and disposal services as billed by WASD. The monthly sewer user rates charged for service shall be in accordance with the consumer applicability provisions and the corresponding schedule set in Appendix A as 9 Page 463 of 1707 may be adjusted from time to time based on the provisions of the section and in Appendix A. The billed sewer consumption shall be based on the metered water delivered to the consumer for which the monthly water user rates apply. The provisions of this section shall not be applicable to any water sold and delivered through separate meters measuring water delivered and consumed solely for swimming pools, lawn sprinkler systems, cooling towers or other purposes not requiring the use of sanitary sewer system facilities of the city. The monthly sanitary sewer user rates shall be charged to each consumer each month in accordance with the following applicability provisions; (1) Individual Metered Residential Service - Applicable to all consumers that represent service to a residential dwelling unit that is individually metered for water service. (2) Master-metered Multifamily Residential Service - Applicable to all sewer consumers that represent service to a residential dwelling units that is master- metered (more than one residential dwelling unit being served by the water meter measuring service to the premises) which would include, but not be limited to, condominiums, apartments, and duplexes. (3) Nonresidential Service- Applicable to all sewer customers that are not classified as individually metered residential service or master-metered residential service which primarily represents service to commercial, public authorities. and institutional customers. (b) To the extent practical, all sanitary sewer service provided to a consumer shall be based on the metered water delivered to the premises, exclusive of water-only service which is separately metered by the city, and shall be billed the sewer consumption charge and the purchased sanitary sewer pass-through charge, which rate shall be prorated for each 100 gallons in the event of increments of less than 1,000 gallons for all consumers being billed for sanitary sewer service. With respect to the billing for sanitary sewer use, the sewer consumption rates and the purchased sanitary sewer pass-through rate as defined in this section may be added together for rate application or billing purposes on a consumer's bill. (c) Pass-Through of Purchased Wholesale Sanitary Sewer Charges. The Purchased Sanitary Sewer Pass-through Rate, which is applied to all sanitary sewer consumers being billed for sewer service, shall be increased or decreased by the city by applying a pass-through adjustment factor for any change in the rates charged to the city for wholesale wastewater treatment and disposal services purchased from WASD (the "Sanitary Sewer Pass-Through Adjustment") to the Purchased Sewer Pass-through Rate charged by the city. (1) Adjustment Schedule. The implementation of the adjustment to the Purchased Sanitary Sewer Pass-Through Rate for any month that a change in wholesale sanitary sewer rates by WASD is effectuated ("Sewer Cost Recovery") shall 10 Page 464 of 1707 occur without a public hearing. Sewer Cost Recovery shall be employed each time that WASD adjusts the average annual wholesale sanitary sewer rates that are billed to the city. Any adjustment to the Purchased Sanitary Sewer Pass- Through Rate based on the determination of the change in wholesale rates shall be implemented in the month immediately following the determination of the Purchased Sanitary Sewer Pass-Through Adjustment. The Purchased Sanitary Sewer Pass-Through Rate as shown Gin Appendix A and as may be further adjusted automatically in the future by the implementation of the provisions of this section and in Appendix A and which are then in effect shall be increased or decreased by the city by applying a Purchased Sanitary Sewer Pass-through Adjustment established in accordance with this subsection and in Appendix A to the then effective Purchased Sanitary Sewer Pass-Through Rate prior to such application. Nothing herein shall preclude the city from making additional changes to the monthly sanitary sewer user rates for service. (2) Applicability of Purchased Sanitary Sewer Rates. The Purchased Sanitary Sewer Pass-Through Rate shall be in addition to any sewer consumption rates for all retail and wholesale customers that are billed for wastewater treatment and disposal services by the city.The following are the customers that shall be subject to the application of the Purchased Sanitary Sewer Pass-through Rate and shall be subject to the pass-through for changes in the cost of purchased wastewater treatment and disposal services from WASD (the "Applicable Customers"): (i) The retail water customer classes that are billed the sewer consumption charge referenced in this section. (ii) All separate utilities or local governments that may receive wholesale sewer service provided by the city currently or in the future which is not considered as retail customers. (3) Calculation of Purchased Sanitary Sewer Pass-Through Adjustment. The Purchased Sanitary Sewer Pass-Through Adjustment shall be calculated using the following formula: WWC) * (14(1 (OF + T + C))) Where: A . - - _- - - - e -e e 1 ♦ 6 . _ III e . - - - rate charged by WASD expressed on a dollar per 1,000 gallons basis 11 Page 465 of 1707 a - ._ e e . . 0 - e. , -- - a . .. -■ - th . . . - _ - . .. _ - . - •- e . : - • . - .. - - APSTR - PSTR + PSPTA W - -- - - • - - - - - - - - - - - - - • - . - - -- - • - -- • . - - - - - S.• - -- • - - •• - - - - • - - •-- - - - - e ••- - - - _ - - - service. b ' following tables Line No' � Aat eferepse • - - - ... - -- - 4 PWSC $2.7870 . . _ - I t! gallons) - - - - - - - 2 $2.9477 -• - - - 543% Adjustments 12 Page 466 of 1707 4 BF 8.00% 5 T 0.00-% 6 Adjustment Factor- 11(1 (D+T+O))- 1/0.92 7 1.08696 8-(3*7) 6,2244 - . . - ... gallons) - - - - - _ - 9 PSTR $3.50 - - - -- - 4=9'18 P&P-TA $0.22 • - ... 11-9+1 - - - APS-TR $3,72. gallons) 0 ..- - - - • • • II A . " •• a . - - - . . . - - - - n- I . - -- • - • S - • - - . - - - �^, ^ a- -- - - ' - forCost Re y (i) All increases or decreases in the percentage charge of the Department of _ • _ - -- 11_ 11 - - -- - - - '- -- - - - - . _ - - - - - - - - - PTF - ARR/ER 13 Page 467 of 1707 Where: - •••• - ••- - • •• ..- - - - - - - - - estimated annual increase in the Applicable Costs, expressed as a percentage of the most roccnt historical revenues derived from the • e . PTR - (AR)(1 + PTF) Where: - - '- - - -- • ' - - - - - - - - - - - - - - - - ••- - ` - - •-- - - - :_ •• - - - - - - - • - - - PTF -The Pass Through Factor as determined by the city to recover-the net Sec. 110-171. - Rate indexing. (a) Water and sewer rates. Except as otherwise provided in this subsection, the monthly user rates established in subsections 110-167(a) for the water system and 110- 168(a) for the sanitary sewer system (collectively, the "applicable rates") as shown on schedule Appendix A and-as-may be further adjusted automatically in the future by implementation of the automatic rate indexing provisions as specified in Appendix -_- e . - -- • - - - - - - • - • - - - ' T. - - - - - - - -- - - - - • 11• - " • e • _ •.- . .. . - -• - - - _ - .. - . - - - - _ - - - • _ • _ 14 Page 468 of 1707 .. - - _ " „ a a . _ PIF - ([OP (PWE+PSE+PT)]*EPI)/[(ER PTR)/* (1/(1 (DF+T+O)))} Where: PIF -The price - - - - - - - • - • - - - - -- - - - _ - . adjustment in the applicable rates. The PIF represents the estimated period that is c - - - •- - - -, - - - - - - - - - - - = - - - - -- - - OP - The total expenses, paid or accFued, for the operations, maintenance, - e - - - "operating expenses". -- -- - - -- - • - - _ • - a ' • - _ - _ -- - • - • 1 • . - - adjusted to include the fcc paid to the Department of Environmental •-- -- - - - - - e- - - ! ' _ • _ - - - . . 15 Page 469 of 1707 S - - - _ . - - ... ! • - _ - - _ . EPI - The Consumer Price Index All Urban--Consumers. Miami Fort - - - „ - --e - . e ie A • I • • , , _o a PTR - The total actual revenues earned by the utility system during the • • - Line Formula Amount Reference 4 8R $567906,238 Le-s: Purchased Water Expenses t22 .... .PWPTR $14,258,142 _ -• - 3 PSPTR $20,865,353 • 4 P-T Adjusted-Operating-Expenses 5-1 2 3 4 $21,782,443 Effective-Price-Index EPl 6 245.195 248.741 8=7-6 3,546 16 Page 470 of 1707 Annual Percent Change 9=8/6 1.14% -_ - - - __ •- _ _ 10-5*0 $313,667 44 € $78T2947986 Less: PTR - - - - - - -- - - - � $45748E007 Revenue - - 14 $22,679,732 Revenue ' e -- - - - - - - - 6-•:•••••• _ 14-11 12 13 - _ 15-10/14 •0:8994 Adjustments TLT - - - 4-6 8.00% Management 000% Other Adjustments 4-8 0 0- - - •• a - a e.• 49 1,08696 price Inde„ Adjustment :20-15*10 R 04494 (ii) Determination of indexed rates. The indexed rues shall be determined TR)(-1 #PIC) Where: IR - The indexed applicable rates that arc to be-placed in effect in the (b) Stormwater rates. Except as otherwise provided in this subsection, the monthly user rates established in section 110-109 for the stormwater system as shown en-schedule in Appendix A and as may be further adjusted automatically in the future by implementation of the automatic rate indexing provisions as specified in Appendix A. 17 Page 471 of 1707 - - - T - " £ 11 " • i • 1 • SECTION 2. That Chapter 110, "UTILITIES," Article IV "Fees, charges, rates and billing procedures," in APPENDIX A is hereby amended asfollows: APPENDIX A FEE SCHEDULE * * * Article IV. Fees, Charges, Rates and Billing Procedure Division 2. Rates, Fees and Charges . The monthly water and sewer user rates for Fiscal Years 2021 to 2025 are based on the recommendations of a formal rate study completed in 2020. The water user rates are designed to increase water revenues by 3.5% per year, while the sewer user rates are designed to increase sewer revenues by 1.5% to 1.6% per year. On a combined basis, the monthly user rates are designed to increase overall utility revenues by 2.3% to 2.4% per year. These increases are in addition to the pass-through of future wholesale water and sewer rate increases from the Miami- Dade County Water and Sewer Department after Fiscal Year 2021.After Fiscal Year 2025, the City shall continue to implement automatically the pass-through increases and rate indexing adjustments as allowed by the City Code. 110- a Monthly 166(a) Water Rates 110- Individual Metered 166(a)(1) Residential Service Annual Rate Rate Rate Rate Rate Adjustment Effective Effective Effective Effective Effective (References January October October October October shown are 1, 2021 1, 2021 1, 2022 1. 2023 1. 2024 defined at 18 Page 472 of 1707 the end of this Appendix A) Base Facility Charge(per meter size) gate 3A-inch $8.32 $9.35 $10.29 $11.32 $12.45 $13.69 [C] 1-inch 8:68 9.76 10.74 11.81 12.99 . 14.29 [C] 16-inch 9:53 10.71 11.79 12.97 14.27 15.69 [C] 2-inch 1-0:38 11.67 12.84 14.13 15.54 17.09 [C] 3-inch 48:90 12.25 13.49 ; 14.84 16.32: 17.94 [C] 4-inch 156 14.11 15.53 17.09 . 18.79 20.66 [C] Water Consumption Charge(per 1,000 gallons) 0 to 8,000 Gallons $0-96 $0.84 $0.88 $0.93 $0.97 $1.02 [C] 8,001 to 16,000 2.61 2.31 2.42 2.56 2.67 2.81 [C] Gallons 16,001 to 24,000 3-93 3.44 3.60 3.81 3.97 4.17 [C] Gallons Above 24,000 6-36 4.70 4.92 5.20 5.42 5.70 [C] Gallons Purchased Water Pass-Through Rate (per 1,000 gallons) All Water Use $1-99 $2.26 $2.26 $2.26 $2.26 $2.26 [C] Master-Metered • 110- Multifamily 166(a)(2) Residential Service Annual Adjustment (References shown are Rate Rate Rate Rate Rate defined at • Effective Effective Effective Effective Effective the end of January October October October October this 1. 2021 1. 2021 1 2022 1, 2023 1, 2024 Appendix A) 19 Page 473 of 1707 Base Facility Charge(per meter size) nate 3/-inch $8.32 $9.35 $10.29 $11.32 $12.45 $13.69 [C] 1-inch 17.06 20.20 22.23 24.45 26.89 29.57 [C] 11/2-inch 34.-26 38.51 42.38 46.63 51.28 56.39 [C] 2-inch 53.66 60.32 66.39 73.03 80.32 88.32 [C] 3-inch 103.62 116.49 128.20 141.03 155.11 170.56 [C] 4-inch 460.92 180.91 199.09 219.02 240.89 . 264.88 [C] 6-inch 322-36 362.42 398.85 438.78 482.58 530.64 [C] 8-inch 68948 572.33 629.87 692.92 762.09 837.99 [C] 10-inch 730.80 821.57 904.16 994.67 [C] 1.093.96 1.202.92 12-inch 1,350.95 1.518.74 1.671.42 1.838.73 2.022.28 .2.223.69 [C] Water Consumption Charge (per 1,000 gallons)[•] Block 1 $4:68 $1.47 $1.54 $1.63 $1.70 1.79 [C] Block 2 2.87, 2.52 2.64 2.79 2.91 3.06 [C] Block 3 383 3.35 3.51 3.71 : 3.87 4.07 [C] Purchased Water Pass-Through Rate (per 1,000 gallons) All Water Use $44/9 $2.26 $2.26 $2.26 $2.26. 2.26 [C] ['] Usage blocks by-meter size: Size of Meter Block 1 (gallons) Block 2(gallons) Block 3(gallons) 3/-inch 0 to 16,000 16,001 to 32,000 Over 32,000 1-inch 0 to 40,000 40,001 to 80,000 Over 80,000 1.5-inch .0 to 80,000 80,001 to 160,000 Over 160,000 2-inch 0 to 128,000 128,001 to 256,000 Over 256,000 3-inch 0 to 256,000 256,001 to 512,000 Over 512,001 4-inch 0 to 400,000 400,001 to 800,000 Over 800,000 6-inch 0 to 800,000 800,001 to 1,600,000 Over 1,600,000 8-inch 0 to 1,280,000 1,280,001 to 2,560,000 Over 2,560,000 20 Page 474 of 1707 10-inch 0 to 1,840,000 1,840,001 to 3,680,000 Over 3,680,000 12-inch 0 to 3,440,000 3,440,001 to 6,880,000 Over 6,880,000 110- Nonresidential 166(a)(3) Service Annual Adjustment (References shown are Rate Rate Rate Rate Rate defined at Effective Effective Effective Effective Effective the end of January October October October October this 1. 2021 1. 2021 1, 2022 1, 2023 1, 2024 Appendix A) Base Facility Charge (per meter size) Rate 3/-inch $8.32 $9.35 $10.29 $11.32 $12.45 $13.69 [C] 1-inch 47.96 20.20 22.23 24.45 26.89 29.57 [C] 1'/z-inch 34.26 38.51 42.38 46.63 51.28 56.39 [C] 2-inch 53.66 60.32 66.39 73.03 80.32 88.32 [C] 3-inch 103.62 116.49 128.20 141.03 155.11 170.56 [C] 4-inch 460 180.91 199.09 219.02 240.89 264.88 [C] 6-inch 322.38 362.42 398.85 438.78 482.58 530.64 [C] 8-inch 50940 572.33 629.87 692.92 762.09 837.99 [C] 10-inch 7-30,80 821.57 904.16 994.67 1.093.96 1,202.92 [C] 12-inch 1,350.95 1,518.74 1.671.42 1,838.73 2,022.28 2,223.69 [C] Water Consumption Charge(per 1,000 gallons) ['] Block 1 1-:68 $1.47 $1.54 $1.63 $1.70 $1.79 [C] Block 2 2.87 2.52 2.64 2.79 2.91 3.06 [C] Block 3 3:33 3.35 3.51 3.71 3.87 4.07 [C] Purchased Water Pass-Through Rate (per 1,000 gallons) All Water Use 4:89 $2.26 $2.26 $2.26 $2.26 $2.26 [C] ['] Usage blocks by meter size: 21 Page 475 of 1707 Size of Meter Block 1 (gallons) Block 2(gallons) Block 3 3/4-inch 0 to 16`000 .1tLO01 to 32,000 Over 32,000 1-inch Obo40.UUO 40,001 to 80,000 Over 80,000 - - - - ' - --' 1.5-inch 0 to 80,000 80,001 to 160,000 Over 160,000 2-inch 0 to 128.000 128.001 to 256,000 Over 256,000 3-inch 0 to 256,000 258.001ho512.OUO Over 512,001 4-inch Otu4OO.OUD 4OO.O01to8OO.UDU Over 800,000 ' - - - '- 6-inch 0 to 800,000 800.001 to 1,600,000 Over 1,600,000 8-inch 0 to 1,280,000 1.28O.O01bu2'56O.0DD Over 2,560,000 10-inuh 0 to 1,840,000 1.84O.UU1ho3.88O.DDU Over 3,680,000 12-inch Otm3.4DO.0O0 3,440,001 to 6,880,000 Over 6,880,000 -- - Individual Metered 110- Residential ����`�166(a)(4) irrigation Service Annual Adjustment (References shown are Rate Rate Rate Rate Rate defined at Effective Effective Effective Effective Effective thaandof January October October October October this Appendix A) Base Facility }Charge(per meter size) - ^ . 34-inch 8,32 $835 $10.29 $11.32 $12.45 $13.69 � [C]-- - -- - ' - 1-inch 8,68 9.76 10.74 11.81 12.99 14.89 [C] 11/2-inch 9,53 10.71 11.79 12.97 14.27 15i69 [C] 2-inch 4-048 11.67 12.84 14.13 15.54 [C] 3-inch 4-0,99 12�25 1316.32S 14.84 1� � 17.94 [C] 4-inch 4-2,66 1411 15.53 17.09 18.70 20^86 [C] Water Consumption Charge (per 1,000 ' � gallons) ' ' - - - 'Oho10.00OGallons 2.63 $2.31 $2.42 $2.55 $2.66 $2.80 [C] ' - Above 16,000 5,36 [C] Gallons 4.70 4.92 5.20 5.42 5.70 2Z •Purchased Water •Pass-Through Rate (per 1,000 gallons) !All Water Use. 4-99 $2.26 $2.26 $2.26 $2.26 $2.26 [C] Master-Metered 110- Multifamily 166(a)(5) ,Residential :irrigation Service •• Annual Adjustment • (References shown are Rate Rate Rate Rate Rate defined at Effective Effective Effective Effective Effective the end of January October October October October this 1, 2021 : 1, 2021 1. 2022 1, 2023 ` 1, 2024 .Appendix A) Base Facility Charge(per meter size) Rate 3/-inch 832 $9.35 $10.29 $11.32 $12.45 $13.69 [C] 1-inch 4-46 20.20 22.23 24.45 26.89 29.57 [C] 11/2-inch 2446 38.51 42.38 46.63 51.28 56.39 [C] :2-inch 53.66 60.32 66.39 73.03 80.32 88.32 [C] 3-inch 403.62 116.49 128.20 141.03 155.11 170.56 [C] 4-inch 160.92 180.91 199.09 219.02 240.89 264.88 [C] 6-inch 322238 362.42 398.85 438.78 482.58 530.64 [C] 8-inch 50040 572.33 629.87 692.92 762.09 837.99 [C] 10-inch 730.80 821.57 904.16 994.67 1 093.96 1,202.92 [C] 12-inch 1,350.95 1,518.74 1,671.42 1,838.73 2,022.28 2,223.69 [C] Water Consumption Charge(per 1,000 gallons)['] Block 1 2.63 $2.31 $2.42 $2.55 $2.66 $2.80 [C] Block 2 5:36 4.70 4.92 5.20 5.42 5/0 [C] Purchased Water Pass-Through Rate (per 1,000 gallons) All Water Use 4-99 $2.26 $2.26 $2.26 $2.26 $2.26 [C] [•] Usage blocks by meter size: 23 Page 477 of 1707 Size of Block 2 Block 1 (gallons) Meter (gallons) 3A-inch 0 to 32,000 Over 32,000 1-inch 0 to 80,000 Over 80,000 1.5-inch 0 to 160,000 Over 160,000 2-inch 0 to 256,000 Over 256,000 3-inch 0 to 512,000 Over 512,001 4-inch 0 to 800,000 Over 800,000 6-inch 0 to 1,600,000 Over 1,600,000 8-inch 0 to 2,560,000 Over :2,560,000 10-inch 0 to 3,680,000 Over 3,680,000 i 12-inch 0 to 6,880,000 Over 6,880,000 110- Nonresidential 166(a)(6) Irrigation Service Annual Adjustment (References shown are Rate Rate Rate Rate Rate defined at Effective Effective Effective Effective Effective the end of January October October October October this 1, 2021 1. 2021 1, 2022 1. 2023 1. 2024 Appendix A) Base Facility Charge(per meter size) Rate 34-inch 8732. $9.35 $10.29 $11.32 $12.45 $13.69 [C] 1-inch 4746` 20.20 22.23 24.45 26.89 29.57 [C] 11/2-inch 34.2 : 38.51 42.38 46.63 51.28 56.39 [C] 2-inch 63,66 60.32 • 66.39 73.03 80.32 88.32 [C] 3-inch 103.62 _ 116.49 128.20 141.03 155.11 170.56 [C] 4-inch 4 92: 180.91 : 199.09 219.02 240.89 264.88 [C] 24 Page 478 of 1707 • 6-inch 32248 362.42 398.85 438.78 482.58 530.64 [C] 8-inch 609.10 572.33 629.87 692.92 762.09 837.99 [C] 10-inch 730,80 821.57 904.16 994.67 1,093.96 1,202.92 [C] 12-inch 1,350.95 1,518.74 1,671.42 1,838.73 2.022.28 2,223.69 [C] Water Consumption Charge (per 1,000 gallons) [' Block 1 2.63 $2.31 $2.42 $2.55 $2.66 $2.80 [C] Block 2 546 4.70 4.92 5.20 5A2 5.70 [C] Purchased Water Pass- Through Rate (per 1,000 gallons) All Water Use 4-99 $2.26 $2.26 $2.26. $2.26 $2.26 [C] [*1 Usage blocks by meter size: Size of Meter Block 1 (gallons) Block 2 (gallons) %-inch 0 to 32,000 Over 32,000 1-inch 0 to 80,000 Over 80,000 1.5-inch 0 to 160,000 Over 160,000 2-inch 0 to 256,000 Over 256,000 3-inch 0 to 512,000 Over 512,001 4-inch 0 to 800,000 Over 800,000 6-inch 0 to 1,600,000 Over 1,600,000 8-inch 0 to 2,560,000 Over 2,560,000 10-inch 0 to 3,680,000 Over 3,680,000 12-inch 0 to 6,880,000 Over 6,880,000 * * * 110- Monthly Sewer 168(a) Rates 110- Individual metered I68(a)(1) residential service: 25 Page 479 of 1707 Annual Adjustment (References shown are Rate Rate Rate Rate Rate defined at Effective Effective Effective Effective Effective the end of January October October October October this 1. 2021 1, 2021 1 2022 1, 2023 1, 2024 Appendix A) Base facility charge (all meter sizes) Rate All meter Sizes 8:98 $10.11 $11.12 $12.24 $13.46 $14.81 [D] Sewer consumption charge(per 1,000 gallons) All gallons (based on metered water consumption) /1.53 $5.01 $5.10 $5.20 $5.30 $5.38 [D] Purchased sanitary sewer pass-through rate (per 1,000 gallons) All gallons (based on metered water • consumption 5.33 $5.25 $5.25 $5.25 $5.25, $5.25 [D] Master-metered 110- multifamily 168(a)(2) residential service: Annual Adjustment (References shown are Rate Rate Rate Rate Rate defined at Effective Effective, Effective Effective Effective the end of January October October October October this 1, 2021 1, 2021 1, 2022 1, 2023 1. 2024 Appendix A) Base facility charge Rate (per meter size) 34-inch 8:-99 $10.11 $11.12 $12.24 $13.46 $14.81 : [D] 1-inch 2048 22.57 24.83 27.33 . 30.05 33.07 ED] 11/2-inch 3847 43.37 47.70 52.50 57.74 63.53 [D] 2-inch 60.75 68.31 75.13 82.70 90.94 100.06 [D] 26 Page 480 of 1707 3-inch 119.91 134.82 148.29 . 163.22 179.49` 197.49 , [D] 4-inch 186.17 209.65 230.59 253.82 ' 279.12: 307.11 [D] 6-inch 374,34 417.50 459.21 505.46 555.84 611.59 [D] • 8-inch 59348 666.92 733.54 807.43 : 887.91 976.96 [D] 10-inch 852,00; 957.91 : 1,053.60 1.159.72 :1,275.32 1,403.23 [D] .12-inch 1,591.48:1,789.32 1,968.07:2.166.29 2,382.21 ; 2,621.14 [D] Sewer consumption charge(per 1,000 gallons): All gallons (based • on metered water consumption) 1.53 $5.01 $5.10 $5.20 $5.30 ' $5.38 [D] Purchased sanitary sewer pass-through • rate(per 1,000 gallons): ,All gallons(based on metered water consumption) 5.33 $5.25; $5.25 $5.25 : $5.25 $5.25 [D] • 110- Nonresidential 168(a)(3) service: Annual Adjustment • (References shown are Rate Rate . Rate Rate` Rate defined at Effective Effective Effective Effective Effective the end of • January' October . October• October October` this : 1, 2021 1, 2021 1, 2022 1. 2023 : 1, 2024 Appendix A) • Base facility charge Rate (per meter size) • .3/-inch 8:98 $10.11 $11.12 : $12.24 $13.46 $14.81 [D] 1-inch 2008 22.57 24.83 27.33 30.05 33.071 [D] 11/2-inch 3847 43.37 47.70 : 52.50 57.74 63.53 [D] 2-inch 6045 68.31 : 75.13 ` 82.70 90.94 100.06 [D] • 3-inch 119.91 : 134.82 148.29 163.22 179.49 197.49 [D] 4-inch ' 186.47 209.65 230.59 253.82 i 279.12 307.11 ! [D] 6-inch 371-34 417.50 459.21 505.46 555.84 611.59 [D] 8-1nch 493-4.8 666.92: 733.54 l 807.43 887.91 : 976.96' [D] 27 Page 481 of 1707 10-inch 852.00 957.91 1,053.60 1,159.72 1,275.32 1,403.23 [D] 12-inch 1,591A8 1,789.32 1,968.07 2,166.29 2,382.21 2,621.14 [D] Sewer consumption charge(per 1,000 gallons): All gallons(based on metered water consumption) '1.53 $5.01 $5.10 $5.20 $5.30 $5.38 [D] Purchased sanitary sewer pass-through rate(per 1,000 gallons): All gallons (based on metered water consumption) 533 $5.25 $5.25 $5.25 $5.25 $5.25 [D] * * * Annual Adjustment Reference Definitions: * * * [C] = Pass-Through of Purchased Wholesale Water Charges and Rate Indexing. Pass-Through of Purchased Wholesale Water Charges. The Purchased Water Pass-Through Rate, which is applied to all water consumers being billed for potable water service, shall be increased or decreased by the city by applying a pass- through adjustment factor for any change in the average annual rates charged to the city for wholesale potable water purchased from the Miami-Dade Water and Sewer Department ("WASD") to the Purchased Water Pass-Through Rate charged by the city (the "Purchased Water Pass-Through Adjustment"). (1) Adjustment schedule. The implementation of the adjustment to the Purchased Water Pass-Through Rate for any month that a change in wholesale potable water rates by WASD is effectuated ("Water Cost Recovery") shall occur without a public hearing. Water Cost Recovery shall be employed each time that WASD adjusts the average annual wholesale potable water rates that are billed to the city. Any adjustment to the Purchased Water Pass-Through Rate based on the determination of the change in wholesale rates shall be implemented in the month immediately following the determination of the Purchased Water Pass-Through Adjustment. The Purchased Water Pass- Through Rate as shown ein Appendix A and as may be further adjusted automatically in the future by the implementation of the provisions of this section and which are then in effect shall be increased or decreased by the city by applying a Purchased Water Pass-Through Adjustment established in accordance with this subsection to the then effective Purchased Water Pass- 28 Page 482 of 1707 Through Rate prior to such application. Nothing herein shall preclude the city from making additional changes to the monthly water user rates for service. (2) Applicability of Purchased Water Rates. The Purchased Water Pass-Through Rate shall be in addition to any water consumption rates for all retail and wholesale customers that are billed for potable water service by the city. The following are the customers that shall be subject to the application of the Purchased Water Pass-through Rate and shall be subject to the pass-through for changes in the cost of purchased water from WASD (the "Applicable Customers"): (i) The retail water customer classes that are billed the water consumption charge referenced in this section. (ii) All separate utilities or local governments that may receive wholesale potable water service provided by the city currently or in the future that are not considered to be retail customers. (3) Calculation of Purchased Water Pass-Through Adjustment. The Purchased Water Pass-Through Adjustment shall be calculated using the following formula: PWPTA = ((IWWC - PWWC) * (1/(1-(DF + T + 0))) Where: PWPTA = The Purchased Water Pass-Through Adjustment to be used for Water Cost Recovery to determine the monetary adjustment in the Purchased Water Pass-through Rate to be applied the Applicable Customers. The PWPTA represents the respective dollar increase or decrease to account for changes in wholesale potable water rates charged by WASD to the city that is added or subtracted, respectively to the Purchased Water Pass-Through Rate. IWWC = The increased annual average wholesale or purchased water rate charged by WASD expressed on a dollar per 1,000 gallons basis that became effective for the month immediately after the PWWC. PWWC = The prior annual average wholesale or purchased water rate charged by WASD expressed on a dollar per 1,000 gallons basis immediately prior to the billing of the adjusted wholesale or purchased water rate defined as the IWWC. DF = The fee paid to the Department of Environmental Resources Management (DERM)which is based on a percent of rate revenues billed by the city. T=Any and all taxes or tax equivalents that may be paid by the water system that is based on revenues billed by the city, including any payment in lieu of tax imposed by the city on its water system. 29 Page 483 of 1707 O = Any and all charges that may be paid by the city on behalf of the water system that is based on revenues billed by the city, including any funding of renewals and replacement fund deposits that is determined as a percent of revenues billed. (4) Determination of Purchased Water Pass-Through Rate. The Purchased Water Pass-Through Rate shall be determined based on the addition or subtraction of the Purchased Water Pass-Through Adjustment to the rates in effect immediately preceding such adjustment and shall be rounded to the nearest cent. The Purchased Water Pass-Through Adjustment application shall be based on the following formula: APWTR = PWPTR + PWPTA Where: APWTR = The Adjusted Purchased Water Pass-Through Rate that is to be placed in effect after the application of the Purchased Water Pass-Through Adjustment to all Applicable Customers billed for potable water service. PWPTR =The Purchased Water Pass-Through Rate in effect immediately prior to the application of the PWPTA. PWPTA = The Purchased Water Pass-Through Adjustment as determined as a result of a change in wholesale water rates as billed by WASD. (5) [Example of calculation.]An example of the calculation of the determination of the Purchased Water Pass-Through Adjustment and the corresponding change to the Purchased Water Pass-Through Rate is illustrated in the following table: Line No. Formula Amount Reference Prior Wholesale Purchased Water Rate($/1,000 gallons) 1 PWWC $1.7350 Increased Wholesale Purchased Water Rate($/1,000 gallons) 2 IWWC $1.7700 Percent Change in Wholesale Purchased Water Rate 3=(2-1)/1 2.02% Adjustments Department of Environmental Resources Management 4 DF 8.00% Taxes and Tax Equivalents 5 T 0.00% Other Adjustments 6 O 0.00% Adjustment Factor= 1/1-(D+T+O)) =1/0.92 7 1.08696 Purchased Water Pass-Through Percent Adjustment 8=(3*7) 2.20% Prior Purchased Water Pass-Through Rate($/1,000 gallons) 9 PWPTR $1.93 Purchased Water Pass-Through Adjustment 10=9*8 PWPTA $0.04 Adjusted Purchased Water Pass-Through Rate ($/1,000 11=9+10 APWTR $1.97 gallons) 30 Page 484 of 1707 Pass-Through Adjustment Charges. The Applicable Rates as may be further adjusted automatically in the future by the implementation of the provisions as contained in this Appendix A and which are then in effect shall be increased or decreased by the city by applying a pass-through adjustment factor established in accordance with this subsection (the "Pass-Through Factor") to the then effective Applicable Rates for increases or decreases in the Applicable Costs. All Applicable Rates so adjusted (the "Pass-Through Rates") shall be charged by the city's water system. (1) Adjustment Schedule. The implementation of Pass-Through Rates for any month associated with a change in Applicable Costs ("Cost Recovery") shall be placed into effect automatically and shall occur without a public hearing. Nothing herein shall preclude the city from making additional changes to the monthly water user rates for service. (2) Applicable Rates. The water base facility, water consumption charges, and Purchased Water Pass-through Rate referenced in subsection 110-166(a)shall be subject to Cost Recovery. (3) Applicable Costs. Only the following cost categories qualify as Applicable Costs for Cost Recovery: (i) All increases or decreases in the percentage charge of the Department of Environmental Resources Management. (ii) All increases or decreases in the application of any tax or tax equivalents, including any payment in lieu of tax imposed by the city on its water system. (iii)All other cost increases incurred by the water system as a result of any regulatory changes or requirements imposed by any regulatory agency having jurisdiction over the utility system operations (a "Regulator"). (4) Calculation of Pass-Through Factor. The Pass-Through Factor shall be calculated using the following formula: PTF = ARR/ER Where: PTF = The Pass-Through Factor used for Cost Recovery to determine the monetary adjustment in the Applicable Rates. The PTF represents the estimated annual increase in the Applicable Costs, expressed as a percentage of the most recent historical revenues derived from the Applicable Rates for the most recently completed fiscal year. ARR = Additional Required Revenue equal to the estimated annual change in the Applicable Costs that will affect the overall cost of providing water system services as determined by the city. ER = The total actual revenues earned by the Enterprise System from the Applicable Rates for the potable water system as reported in the city for the most recently completed fiscal year. 31 Page 485 of 1707 (5) Determination of Pass-Through Rates. The Pass-Through Rates shall be determined based on the Pass-Through Factor applied uniformly to the Applicable Rates in effect and shall be rounded to the nearest cent. The Pass- through application shall be based on the following formula: PTR = (AR)(1 + PTF) Where: PTR = The Pass-Through Rates that are to be placed in effect for the current fiscal year through application of the Pass-Through Factor. AR = The Applicable Rates in effect immediately prior to the application of the Pass-Through Factor. PTF = The Pass-Through Factor as determined by the city to recover the net change in Applicable Costs. Rate Indexing. Effective for all bills rendered on or after October 1, 2025, and except as otherwise provided,the monthly user rates established in subsections 110-167(a) for the water system and 110-168(a)for the sanitary sewer system (collectively, the "applicable rates") as shown in Appendix A and as may be further adjusted automatically in the future by implementation of the provisions of this section and which are then in effect shall be increased by the city each year by applying the price index factor established for that year in accordance with this subsection (the "price index factor") to the then applicable rates to offset the effects of inflation on the cost of operating and maintaining the system. The Rate Index shall never be less than 0.0%. All applicable rates so adjusted (the "indexed rates") shall be implemented by the city. (1) Adjustment schedule. Each implementation of indexed rates ("rate indexing") shall be placed into effect automatically and shall occur without a public hearing. Rate indexing shall not be employed more than once in any fiscal year. Any indexed rates based on the operating and maintenance expenses for the most recently completed fiscal year shall be implemented as of October 1 of the subsequent fiscal year. Nothing herein shall preclude the city from making additional changes to the water or wastewater rates for service. (2) Applicable rates. The water base facility charge and water consumption charges referenced in subsection 110-167(a)for the water system and sanitary sewer base facility charge and sanitary sewer consumption charges referenced in subsection 110-168(a)for the sanitary sewer system shall be subject to rate indexing. The purchased water pass-through rate and the purchased sanitary sewer pass-through rates as referenced in the respective subsections shall not be subject to rate indexing. (3) Calculation of price index factor. The price index factor shall be determined based on the actual reported financial results as contained in the annual comprehensive annual financial report and the records for the most recently completed fiscal year preceding the determination of the rate index (the 32 Page 486 of 1707 "calculation period"). By way of example, the rate index to be applied on October 1, 2017 would be based on the actual financial results for the 12 months ended September 30, 2016. The price index factor shall be calculated using the following formula: PIF = ([OP- (PWE+PSE+PT)]*EPl)/[(ER-PTR)/ * (1/(1- (DF+T+O)))] Where: PIF =The price index factor used for rate indexing to determine the monetary adjustment in the applicable rates. The PIF represents the estimated increase in operation and maintenance expenses during the calculation period that is subject to inflation, expressed as a percentage of applicable rates revenues earned during the calculation period. The amount of the rate index increase is a component of any additional revenue required by the utility system to ensure compliance with the bond covenants and fiscal requirements of the utility system (the "additional required revenue"). OP = The total expenses, paid or accrued, for the operations, maintenance, and repair of the water and wastewater systems as reported in the comprehensive annual financial report and other financial records for the city for the calculation period after excluding: (a)allowances for depreciation and amortization expense; and (b) capitalized salaries and other overhead related to the city's capital improvement program (CIP). Such total expenses as adjusted for the stated exclusions are hereinafter referred to as the "operating expenses". PWE = That component of the operating expenses (OP) that represent the cost of purchased water service from WASD for the calculation period, adjusted to include the fee paid to the Department of Environmental Resources Management (DERM) which is based on a percent of rate revenues billed by the city for this component of expense. PSE = That component of the operating expenses (OP) that represent the cost of purchased sanitary sewer service from WASD for the calculation period, adjusted to include the fee paid to the Department of Environmental Resources Management (DERM) which is based on a percent of rate revenues billed by the city for this component of expense. PT = The sum of all other components of the operating expenses (OP) for the Calculation Period for which increases in those components may be recovered separately as a pass-through adjustment pursuant to subsections 110-167(d) for the water system and 110-168(a) for the wastewater system. EPI = The Consumer Price Index - All Urban Consumers. Miami-Fort Lauderdale-West Palm Beach (Series ID: CUURS35BSA0), as published by Bureau of Labor Statistics (the "effective price index") as reported for the month of April of the current year compared to the index reported for the immediately preceding month of April. By way of example, the effective price 33 Page 487 of 1707 index published by Bureau of Labor Statistics- All Urban Consumers. Miami- Fort Lauderdale, as of April 2015 was 245.195 and as of April 2016 was 248.741 or a change of 1.446% which shall be applied to the applicable operating expenses reported for fiscal year 2015. ER = The total actual revenues earned by the utility system from the applicable rates as reported in the comprehensive annual financial reports and other financial records for the calculation period. PTR = The total actual revenues earned by the utility system during the calculation period from the application of i) the purchased-water pass- through rate; ii) the purchased-wastewater pass-through rate; and iii) any other expense that was categorized as a pass-through expense and separately evaluated. (4) Price index calculation example. (i) An example of the calculation of the Price Index Factor based on reported fiscal year 2015 information is illustrated in the following table: Line No. Formula Reference Amount Total Operating Expenses 1 OP $56,906,238 Less: Purchased Water Expenses 2 PWPTR $14,258,442 Purchased Wastewater Expenses 3 PSPTR 20,865,353 Other Pass-through Expenses 4 PT 0 Adjusted Operating Expenses 5=1-2-3-4 $21,782,443 Effective Price Index EPI April 2015 CPI Index 6 245.195 April 2016 CPI Index 7 248.741 Change in CPI Index 8=7-6 3.546 Annual Percent Change 9=8/6 1.44% Additional Required Revenue(Numerator) 10=5*9 $313,667 Actual Applicable Rate Revenues Earned 11 ER $73,291,986 Less: PTR Purchased-Water Pass-Through Rate Revenue '12 $15,498,307 Purchased-Sanitary Sewer Pass-Through Rate 13 22,679,732 Revenue Applicable-Rate Revenue (Denominator) 14=11-12-13 $35,113,974 Price Index Factor before Adjustments 15=10/14 0.89% Adjustments: 34 Page 488 of 1707 Department of Environmental Resources 16 DF 8.000/0 Management Taxes and Tax Equivalents 17 T `0.00% Other Adjustments 18 0 0.00% Adjustment Factor= 1/(1-(D+T+0))=1/0.92 19 1.08696 Price Index Adjustment 20=15*19 PIF 0.97% (ii) Determination of indexed rates. The indexed rates shall be determined based on the price index factor applied uniformly to the applicable rates in effect and shall be rounded to the nearest cent. The determination shall be based on the following formula: IR = (AR)(1 + PIF) Where: IR = The indexed applicable rates that are to be placed in effect in the current fiscal year through application of the price index factor. AR=The applicable rates in effect immediately prior to the application of the price index factor. PIF = The price index factor determined for the calculation period. [D] = Pass-Through of Purchased Wholesale Sanitary Sewer Charges and Rate Indexing. Pass-Through of Purchased Wholesale Sanitary Sewer Charges. The Purchased Sanitary Sewer Pass-Through Rate, which is applied to all sanitary sewer consumers being billed for sewer service, shall be increased or decreased by the city by applying a pass-through adjustment factor for any change in the rates charged to the city for wholesale wastewater treatment and disposal services purchased from WASD (the "Sanitary Sewer Pass-Through Adjustment") to the Purchased Sanitary Sewer Pass-Through Rate charged by the city. (1) Adjustment schedule. The implementation of the adjustment to the Purchased Sanitary Sewer Pass-Through Rate for any month that a change in wholesale sanitary sewer rates by WASD is effectuated ("Sewer Cost Recovery") shall occur without a public hearing. Sewer Cost Recovery shall be employed each time that WASD adjusts the average annual wholesale sanitary sewer rates that are billed to the city. Any adjustment to the Purchased Sanitary Sewer Pass-Through Rate based on the determination of the change in wholesale rates shall be implemented in the month immediately following the determination of the Purchased Sanitary Sewer Pass-Through Adjustment. The Purchased Sanitary Sewer Pass-Through Rate as shown sin Appendix A and as may be further adjusted automatically in the future by the implementation of the provisions of this section and which are then in effect 35 Page 489 of 1707 shall be increased or decreased by the city by applying a Purchased Sanitary Sewer Pass-Through Adjustment established in accordance with this subsection to the then effective Purchased Sanitary Sewer Pass-Through Rate prior to such application. Nothing herein shall preclude the city from making additional changes to the monthly sanitary sewer user rates for service. (2) Applicability of Purchased Sanitary Sewer Rates. The Purchased Sanitary Sewer Pass-Through Rate shall be in addition to any sewer consumption rates for all retail and wholesale customers that are billed for wastewater treatment and disposal services by the city. The following are the customers that shall be subject to the application of the Purchased Sanitary Sewer Pass-Through Rate and shall be subject to the pass-through for changes in the cost of purchased wastewater treatment and disposal services from WASD (the "Applicable Customers"): (i) The retail water customer classes that are billed the sewer consumption charge referenced in this section. (ii) All separate utilities or local governments that may receive wholesale sewer service provided by the city currently or in the future which is not considered as retail customers. (3) Calculation of Purchased Sanitary Sewer Pass-Through Adjustment. The Purchased Sanitary Sewer Pass-Through Adjustment shall be calculated using the following formula: PSPTA = ((IWWC - PWWC) * (1/(1-(DF + T + 0))) Where: PSPTA=The Purchased Sanitary Sewer Pass-Through Adjustment to be used for Sewer Cost Recovery to determine the monetary adjustment in the Purchased Sanitary Sewer Pass-through Rate to be applied the Applicable Customers. The PSPTA represents the respective dollar increase or decrease to account for changes in average annual wholesale wastewater rates charged by WASD to the city that is added or subtracted, respectively to the Purchased Sanitary Sewer Pass-Through Rate. IWSC =The increased average annual wholesale or purchased sanitary sewer rate charged by WASD expressed on a dollar per 1,000-gallons basis that became effective for the month immediately after the PWSC. PWSC =The prior average annual wholesale or purchased sanitary sewer rate charged by WASD expressed on a dollar per 1,000-gallons basis immediately prior to the billing of the adjusted wholesale or purchased sewer rate by WASD. DF = The fee paid to the Department of Environmental Resources Management (DERM) which is based on a percent of rate revenues billed by the city. 36 Page 490 of 1707 T = Any and all taxes or tax equivalents that may be paid by the sewer system that is based on revenues billed by the city, including any payment in lieu of tax imposed by the city on its sanitary sewer system. O = Any and all charges that may be paid by the city on behalf of the sanitary sewer system that is based on revenues billed by the city, including any funding of renewals and replacement fund deposits that is determined as a percent of revenues billed. (4) Determination of Purchased Sanitary Sewer Pass-Through Rate. The Purchased Sanitary Sewer Pass-Through Rate shall be determined based on the addition or subtraction of the Purchased Sanitary Sewer Pass-Through Adjustment to the rates in effect immediately preceding such adjustment and shall be rounded to the nearest cent. The Purchased Sanitary Sewer Pass- Through Adjustment application shall be based on the following formula: APSTR = PSTR + PSPTA Where: APSTR = The Adjusted Purchased Sanitary Sewer Pass-Through Rate that is to be placed in effect after the application of the Purchased Sewer Pass- Through Adjustment to all Applicable Customers billed for wastewater service. PSTR = The Purchased Sanitary Sewer Pass-Through Rate in effect immediately prior to the application of the PSPTA. PSPTA = The Purchased Sanitary Sewer Pass-Through Adjustment as determined as a result of a change in wholesale wastewater rates as billed by WASD. (5) [Example of calculation.]An example of the calculation of the determination of the Purchased Sanitary Sewer Pass-Through Adjustment and the corresponding change to the Purchased Sanitary Sewer Pass-Through Rate is illustrated in the following table: Line No. Formula Amount Reference Prior Wholesale Purchased Sanitary Sewer Rate($11,000 gallons) 1 PWSC $2.7879 Increased Wholesale Purchased Sanitary Sewer Rate($/1,000 2 IWSC $2.9477 gallons) Percent Change in Wholesale Purchased Sanitary Sewer Rate 3;12 5.73% Adjustments Department of Environmental Resources Management 4 DF 8.00% Taxes and Tax Equivalents 5 T 0.00% 37 Page 491 of 1707 Other Adjustments 6 0 0.00% Adjustment Factor= 1/(1-(D+T+O))=1/0.92 7 1.08696 Purchased Sewer Pass-Through Percent Adjustment 8=(3*7) 6.22% Prior Purchased Sanitary Sewer Pass-Through Rate ($/1,000 9 PSTR $3.50 gallons) Purchased Sanitary Sewer Pass-Through Adjustment 10=9*8 PSPTA $0.22 Adjusted Purchased Sanitary Sewer Pass-Through Rate($/1,000 11=9+10 APSTR $3.72 gallons) Pass-Through Adjustment Charges. The Applicable Rates as shown in Appendix A and as may be further adjusted automatically in the future by implementation of the provisions of this section and which are then in effect shall be increased or decreased by the city by applying a pass-through adjustment factor established in accordance with this subsection (the "Pass-Through Factor")to the Applicable Rates for increases or decreases in the Applicable Costs. All Applicable Rates so adjusted (the "Pass-Through Rates") shall be charged by the city's sanitary sewer system. (1) Adjustment Schedule. The implementation of Pass-Through Rates for any month associated with a change in Applicable Costs ("Cost Recovery") shall be placed into effect automatically and shall occur without a public hearing. Nothing herein shall preclude the city from making additional changes to the monthly sanitary sewer user rates for service. (2) Applicable Rates. The sewer base facility, sewer consumption charges, and Purchased Sewer Pass-through Rate referenced in subsection 110-167(a) shall be subject to Cost Recovery. (3) Applicable Costs. Only the following cost categories qualify as Applicable Costs for Cost Recovery: (i) All increases or decreases in the percentage charge of the Department of Environmental Resources Management. (ii) All increases or decreases in the application of any tax or tax equivalents, including any payment in lieu of tax imposed by the city on its sanitary sewer system. (iii) All other cost increases incurred by the sanitary sewer system as a result of any regulatory changes or requirements imposed by any regulatory agency having jurisdiction over the utility system operations (a "Regulator"). (4) Calculation of Pass-Through Factor. The Pass-Through Factor shall be calculated using the following formula: PTF = ARR/ER Where: 38 Page 492 of 1707 PTF = The Pass-Through Factor used for Cost Recovery to determine the monetary adjustment in the Applicable Rates. The PTF represents the estimated annual increase in the Applicable Costs, expressed as a percentage of the most recent historical revenues derived from the Applicable Rates for the most recently completed fiscal year. ARR =Additional Required Revenue equal to the estimated annual change in the Applicable Costs that will affect the overall cost of providing sanitary sewer system services as determined by the city. ER = The total actual revenues earned by the Enterprise System from the Applicable Rates for the sanitary sewer system as reported in the city for the most recently completed fiscal year. (5) Determination of Pass-Through Rates. The Pass-Through Rates shall be determined based on the Pass-Through Factor applied uniformly to the Applicable Rates in effect and shall be rounded to the nearest cent. The Pass- through application shall be based on the following formula: PTR = (AR)(1 + PTF) Where: PTR=The Pass-Through Rates that are to be placed in effect for the current fiscal year through application of the Pass-Through Factor. AR = The Applicable Rates in effect immediately prior to the application of the Pass-Through Factor. PTF =The Pass-Through Factor as determined by the city to recover the net change in Applicable Costs. Rate Indexing. Effective for all bills rendered on or after October 1, 2025, and except as otherwise provided, the monthly user rates established in subsections 110-167(a) for the water system and 110-168(a)for the sanitary sewer system (collectively, the "applicable rates") as shown on Appendix A and as may be further adjusted automatically in the future by implementation of the provisions of this section and which are then in effect shall be increased by the city each year by applying the price index factor established for that year in accordance with this subsection (the "price index factor")to the then applicable rates to offset the effects of inflation on the cost of operating and maintaining the system. The Rate Index shall never be less than 0.0%. All applicable rates so adjusted (the "indexed rates") shall be implemented by the city. (1) Adjustment schedule. Each implementation of indexed rates ("rate indexing") shall be placed into effect automatically and shall occur without a public hearing. Rate indexing shall not be employed more than once in any fiscal year. Any indexed rates based on the operating and maintenance expenses for the most recently completed fiscal year shall be implemented as of October 1 of 39 Page 493 of 1707 the subsequent fiscal year. Nothing herein shall preclude the city from making additional changes to the water or wastewater rates for service. (2) Applicable rates. The water base facility charge and water consumption charges referenced in subsection 110-167(a)for the water system and sanitary sewer base facility charge and sanitary sewer consumption charges referenced in subsection 110-168(a)for the sanitary sewer system shall be subject to rate indexing. The purchased water pass-through rate and the purchased sanitary sewer pass-through rates as referenced in the respective subsections shall not be subject to rate indexing. (3) Calculation of price index factor. The price index factor shall be determined based on the actual reported financial results as contained in the annual comprehensive annual financial report and the records for the most recently completed fiscal year preceding the determination of the rate index (the "calculation period"). By way of example, the rate index to be applied on October 1, 2017 would be based on the actual financial results for the 12 months ended September 30, 2016. The price index factor shall be calculated using the following formula: PIF = ([OP- (PWE+PSE+PT)]*EPI)/[(ER-PTR)/* (1/(1- (DF+T+O)))] Where: PIF = The price index factor used for rate indexing to determine the monetary adjustment in the applicable rates. The PIF represents the estimated increase in operation and maintenance expenses during the calculation period that is subject to inflation, expressed as a percentage of applicable rates revenues earned during the calculation period. The amount of the rate index increase is a component of any additional revenue required by the utility system to ensure compliance with the bond covenants and fiscal requirements of the utility system (the "additional required revenue"). OP =The total expenses, paid or accrued, for the operations, maintenance, and repair of the water and wastewater systems as reported in the comprehensive annual financial report and other financial records for the city for the calculation period after excluding: (a)allowances for depreciation and amortization expense: and (b) capitalized salaries and other overhead related to the city's capital improvement program (CIP). Such total expenses as adjusted for the stated exclusions are hereinafter referred to as the "operating expenses". PWE = That component of the operating expenses (OP) that represent the cost of purchased water service from WASD for the calculation period, adjusted to include the fee paid to the Department of Environmental Resources Management (DERM) which is based on a percent of rate ,revenues billed by the city for this component of expense. PSE = That component of the operating expenses (OP) that represent the cost of purchased sanitary sewer service from WASD for the calculation 40 Page 494 of 1707 period, adjusted to include the fee paid to the Department of Environmental Resources Management (DERM) which is based on a percent of rate revenues billed by the city for this component of expense. PT = The sum of all other components of the operating expenses (OP) for the Calculation Period for which increases in those components may be recovered separately as a pass-through adjustment pursuant to subsections 110-167(d) for the water system and 110-168(a) for the wastewater system. EPI = The Consumer Price Index - All Urban Consumers. Miami-Fort Lauderdale-West Palm Beach (Series ID: CUURS35BSA0), as published by Bureau of Labor Statistics (the "effective price index") as reported for the month of April of the current year compared to the index reported for the immediately preceding month of April. By way of example, the effective price index published by Bureau of Labor Statistics - All Urban Consumers, Miami-Fort Lauderdale, as of April 2015 was 245.195 and as of April 2016 was 248.741 or a change of 1.446%which shall be applied to the applicable operating expenses reported for fiscal year 2015. ER = The total actual revenues earned by the utility system from the applicable rates as reported in the comprehensive annual financial reports and other financial records for the calculation period. PTR = The total actual revenues earned by the utility system during the calculation period from the application of i) the purchased-water pass- through rate; ii) the purchased-wastewater pass-through rate: and iii) any other expense that was categorized as a pass-through expense and separately evaluated. (4) Price index calculation example. (i) An example of the calculation of the Price Index Factor based on reported fiscal year 2015 information is illustrated in the following table: Line No. Formula Reference Amount Total Operating Expenses 1 OP $56,906,238 Less: Purchased Water Expenses 2 PWPTR $14,258,442 Purchased Wastewater Expenses 3 PSPTR 20,865,353 Other Pass-through Expenses 4 PT 0 Adjusted Operating Expenses 5=1-2-3-4 $21,782,443 Effective Price Index EPI April 2015 CPI Index 6 245.195 41 Page 495 of 1707 April 2016 CPI Index 7 248.741 Change in CPI Index 8=7-6 -3.546 Annual Percent Change '9=8/6 :1.44% Additional Required Revenue (Numerator) 10=5*9 ;$313,667 Actual Applicable Rate Revenues Earned 11 ER $73,291,986 Less: PTR Purchased-Water Pass-Through Rate Revenue `12 $15,498,307 Purchased-Sanitary Sewer Pass-Through Rate 13 22,679,732 Revenue Applicable-Rate Revenue(Denominator) 14=11-12-13 1$35,113,974 Price Index Factor before Adjustments 15=10/14 0.89% Adjustments: Department of Environmental Resources Management 16 DF 8.00% Taxes and Tax Equivalents :17 !T 0.00% Other Adjustments :18 0 0.00% Adjustment Factor= 1/(1-(D+T+O))=1/0.92 19 1.08696 Price Index Adjustment 20=15*19 PIF 0.97% (ii) Determination of indexed rates. The indexed rates shall be determined based on the price index factor applied uniformly to the applicable rates in effect and shall be rounded to the nearest cent. The determination shall be based on the following formula: IR = (AR)(1 + PIE) Where: IR = The.indexed applicable rates that are to be placed in effect in the current fiscal year through application of the price index factor. AR =The applicable rates in effect immediately prior to the application of the price index factor. PIF = The price index factor determined for the calculation period. SECTION 3. REPEALER. All ordinances or parts of ordinances in conflict herewith be and the same are hereby repealed. 42 Page 496 of 1707 SECTION 4. SEVERABILITY. If any section, subsection, clause or provision of this Ordinance is held invalid, the remainder shall not be affected by such invalidity. SECTION 5. CODIFICATION. It is the intention of the Mayor and City Commission of the City of Miami Beach, and it is hereby ordained that the provisions of this ordinance shall become and be made a part of the Miami Beach City Code. The sections of this ordinance may be renumbered or relettered to accomplish such intention, and the word "ordinance" may be changed to "section," "article," or other appropriate word. SECTION 6. EFFECTIVE DATE. This Ordinance shall take effect on January 1, 2021, and the revised rates shall be applied to all bills rendered on or after the effective date. PASSED and ADOPTED this day of , 2020 ATTEST: Dan Gelber, Mayor Rafael E. Granado, City Clerk APPROVED AS TO FORM&LANGUAGE Underline denotes additions &FOR EXECUTION �gh denotes deletions C � a...J., .- II- 10- Z° (Sponsored by David Richardson) CDaleity Attorney r12 43 Page 497 of 1707 After Action November 18, 2020 City of Miami Beach City Commission Meeting Office of the City Attorney Sponsored by Commissioner David Richardson ACTION: Ordinance adopted on First Reading. Title of the Ordinance read into the record. Motion made by Commissioner Richardson to adopt the Ordinance on First Reading, seconded by Mayor Gelber. Roll Call: 7-0. Second Reading Public Hearing scheduled on December 9, 2020. Lilia Cardillo to place on the Commission Agenda, if received. Thomas Mooney to handle. Commissioner Richardson explained that this item was learned a few months ago about an error was made in 2015 that required a cap of$500 in the Special Taxing District, and they had to use Reserve funds that these Special Taxing Districts had, and so this is a cleanup item to correct an error learned during the budget cycle. 4:00:49 p.m. R5 R AN ORDINANCE OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, AMENDING CHAPTER 110 OF THE CODE OF THE CITY OF MIAMI BEACH ENTITLED "UTILITIES,"ARTICLE IV, ENTITLED"FEES, CHARGES, RATES AND BILLING PROCEDURE," BY AMENDING SECTION 110-166 THEREOF, ENTITLED "SCHEDULE OF MONTHLY WATER USER RATES AND TAPPING CHARGES;" BY AMENDING SECTION 110-168 THEREOF, ENTITLED "SCHEDULE OF MONTHLY SANITARY SEWER USER RATES" ARE TO BE AMENDED; AND BY AMENDING SECTION 110-171 THEREOF, ENTITLED "RATE INDEXING," IN ORDER TO ADJUST AND MODIFY HOW WATER AND SANITARY SEWER RATES ARE CALCULATED AND APPLIED; AND FURTHER, AMENDING APPENDIX A OF THE CITY CODE, ENTITLED"FEE SCHEDULE,"TO INCREASE THE WATER RATES AND SANITARY SEWER SERVICE CHARGES IMPOSED BY THE CITY PURSUANT TO SECTIONS 110-166, 110-168, 110-171, AND APPENDIX A; PROVIDING FOR CODIFICATION; REPEALER; SEVERABILITY; AND AN EFFECTIVE DATE. First Reading Public Works Sponsored by Commissioner David Richardson ACTION: Ordinance adopted on First Reading. Title of the Ordinance read into the record. Motion made by Commissioner Richardson to adopt the Ordinance on First Reading; seconded by Commissioner Arriola; Roll Call: 6-1; Opposed: Commissioner Gbngora. and setting a Second Reading at the December 9, 2020 Commission Meeting; Lilia Cardillo to place on the Commission Agenda, if received. Roy Coley to handle. DIRECTION: ✓ Administration to come back with actual dollars ✓ Ensure they use all available funds deemed appropriate and determine the proper rate increase. ✓ John Woodruff to prepare a chart on stormwater by Second Reading. John Woodruff to handle. ✓ Commissioner Richardson to work with Administration Administration to come back at the December 9, 2020 Commission Meeting with actual dollars, make sure all available funds that are deemed appropriate are used, and determine the proper increase. John Woodruff and Roy Coley to handle. Roy Coley, Public Works Director, showed a short presentation to explain the rates. Click here to view. What they are presenting to the City Commission today is a five-year critical infrastructure plan contained within in $122 million. This is the work that has been going on for the past five years. When they began this evaluation, they knew there was a lot of work to be done, and the report shows that they need to do more. He explained that the $122 million plan is paid back with Pay-As-You Go Page 41 of 102 Page 498 of 1707 After Action November 18, 2020 City of Miami Beach City Commission Meeting Funding. They identified, with John Woodrufl's help, that they have existing 2010 Sewer Bonds that are now called and refinanced this year, and with those bonds and the net present value today of about$12 million, they combined with Reserves to get$23 million.The$48 million comes from existing bond money, and that makes them $52 million short over five years. To get the $122 total, they need to go to the Bond Market next year, and to pay for that, they would have to increase the City's utility rates. For 2021, starting in January, water and sewer rates average increase would be 2.4%, and the proceeding years through 2025, the rate would be increased 2.3% plus it may be adjustment that the County pass through to the City. An average residential customer in the City that uses 7,000 gallons of water per month, would see their bill go up $4.29 per month, and then the impact goes through the following year. He explained the legislative history of the item and directives given, and recommended approval of the Ordinance on First Reading, setting a Second Reading Public Hearing for December 9, 2020 of the proposed scheduled water and sewer rates through years 2025. Mayor Gelber asked for Roy to explain, in terms of the infrastructure, if this is a catch up, a going forward, or both. Public Works Director Roy Coley explained that in his view the $122 million is primarily catch-up from decades of lack of renewal, replacement, and maintenance. The entire 25-year plan totals $328 million, and a portion of that would be prudent rehabilitation and maintenance. If they do not do this work and if they do not prosecute it as fast as they can,the risk of catastrophic failure exists and grows every day. Mayor Gelber urged his colleagues to ask questions and asked how long would the City be paying this out to make these infrastructure improvements, and will that follow them through what they need in infrastructure improvements, or will the City in ten or 20 years have to do more or do something else to raise money, and what impact will this have on people. Public Works Director Coley explained that this would be 20 year bonds from a financial point, to be paid in 20 years, so it is reasonable to assume that at the end of 20 years, they will have other financial needs of the water and wastewater system that today are not critical but may be in 20 years, and the money would continue to be used. In addition to the $4.29 per household per month that this impacts the citizens, they are going to see construction work, rebuilding sewer pump stations, replacing water lines with construction and they are mindful of that.They work closely with Kevin Pulido, Neighborhood Communications Affairs Manager, to keep neighbors informed but they will see improved water pressure and less sewer backup during flood events. Commissioner Arriola congratulated Roy on the presentation and is supportive of the item. They want to make sure they have the proper infrastructure to handle the basic needs of the City. He hopes his colleagues are supportive. At County level because of decades of delays, the estimate to do this was $10 billion, so local governments will have to wrestle with this, and he wants Miami Beach to lead in this area for future generations. Assistant City Manager Alina Hudak is not sure about the exact number but the County was under a Consent Decree and they had to negotiate with the Department of Justice and mitigate the impact of a Consent Decree. She added that the way this is being proposed mitigates the impact to residents and creates an opportunity to smooth out the increase to residents. Discussion held. Commissioner Richardson fully supports this item and highlighted what Aline said,-that this smooths out increases in rate.They need to be proactive and address these issues; otherwise, it would be more costly, and he is supportive. Page 42 of 102 Page 499 of 1707 After Action November 18, 2020 City of Miami Beach City Commission Meeting Commissioner Gongora stated that the refinancing of the bonds saving millions of dollars is great, and clearly, they need to move forward with the water and sewer work they are doing. This is about how the City is funding those repairs. His concern is that it is 2.3% increase over five years, or 11.5% increase on people water and sewer bills,just from the City, they do not know what is coming from the County as a pass through rate, so on top of the 11.5% over five years it could be double that or more from the County, and that could make it hard for people that are having a hard time making ends meet. They are charging towards the high-end, the second highest charging municipality as far as water and sewer rates with this increase. This is about funding at this point. Did the City look at other funding mechanisms besides the rate increase onto residents? Are there other funding sources other than having residents having to pay the increase? Public Works Director Coley stated that they are not aware of a funding source suitable for this, and asked Rafael Paz to explain, but when they made this plan, the assumption for the fund was for stormwater projects, and they did not consider it, but that is a policy decision and they will follow direction. Rafael Paz, Deputy City Attorney, clarified that the Interlocal Agreement funds could be used for any capital projects. The City Commission has made the decision to restrict the funds for resiliency purposes, that was the intent and the conversations with the County, but it is not limited to sea-level rise, it can be used for other capital projects. Commissioner Gongora wants to do the work but he is not sure how much the increase is going to be to the average homeowner, and he wants to make sure they pursue every other funding source before pushing the rate increase to residents. They do not know what the County is doing and how much water and sewer increase the residents are going to see. City Manager Morales explained that they did not look at the South of Fifth money because they thought it was for sea-level rise only, as they did not have that information, but that is a pot that is available. He added that to the extent they use that money for water and sewer, then is less money for the stormwater utilities; it is one or the other. He emphasized that these are critical projects, and DEP is cracking down on cities that are not investing in infrastructure, and these are important projects. Whether they want to take this money or not, eventually the rates are going to increase. They can look at those funds, but those are probably the only funds they have that they can use for it. Commissioner Steinberg added that the can was kicked down the road a long time ago, because the images of rotting pipes underneath is unacceptable, so they need to do something about it on First Reading and make a decision if they want to move forward with infrastructure projects and pull the trigger. No one wants to vote for an increase in rates but they need to look at what is important. She recommended using all available funds to enhance quality of life for residents, even if that means changing her vote on something else to release fund, she will do that. Between First and Second Reading, perhaps in January, she requested the Administration to bring actual numbers, understand what available funds there are, and see if there is a way to amend some of the increase so that is not at the level seen. They need to do something and focus on what the City is spending funds and the actual needs of the City and find a mechanism on which to get them done. Commissioner Richardson stated that Rafael Paz said that the other funds could be used, but they were committed for sustainability, and asked who had made that commitment. Rafael Paz, Deputy City Attorney, explained that those were discussions with the County and early drafts of the Interlocal Agreement had the restriction for sea-level rise only, but in the final agreement the language was broader, and it is referenced in the Memorandum, that they will use the funds for Page 43 of 102 Page 500 of 1707 After Action November 18, 2020 City of Miami Beach City Commission Meeting sea-level rise or other projects in the City. The City Commission subsequently has restricted the funds for sea-level rise purposes, and that would be why staff would not look at using the funds, as there was a policy decision in place to limit those funds for sea-level rise, but for the strict contract issue, the funds could be used for other purposes. Commissioner Richardson stated that legally they can use it, but the commitment was that it would be used for sustainability, and he shares Jimmy's comment that this is "Rob Peter to pay Paul" situation. Today they had $73 million and they have allocated a piece of that, and to Commissioner Steinberg's point, that was a Voice vote, and unless there is a motion to reconsider that vote is over. If they are now going to take some of that money out of that pot for this fund from stormwater, they are going to have stormwater projects that are not going to get done, so it seems like it is a tough decision but he made a motion. Motion made by Commissioner Richardson to adopt the Resolution, seconded by Commissioner Arriola. Commissioner Gongora stated that there is no doubt that they need to do this critical work identified by staff and agreed that some of it is catch up work. He has a hard time with this because they voted for $666,000 for the matching grant fund; he is not sure if he would vote for that if he could offset people's water and sewer rates; the $400,000 from the General Fund for the College Football event, he is not sure he would vote for that if he could ensure that the people's water and sewer rates stay down. He does not like the item as it was presented as if the rate increase has to happen, and he does not think that it is true, they can identify funds available, and see if this is a necessity or just the easiest way of doing it. Commissioner Steinberg stated that stormwater is also interconnected to sea level rise, and asked that between First and Second, they do everything she stated previously. She is willing to reconsider the earlier item next month as this is too important to address, and all funds ultimately go for quality of life. She will support on First Reading, but directed Administration to come back with actual dollars, make sure they use all available funds they deemed appropriate and determine the proper increase. CFO Woodruff commented that when looking at rates in the water and sewer fund, and the stormwater rates, if they had comparative information,they would be the highest in the stormwater rates; and they are in the mid to higher end on the water and sewer rates. For those reasons they have trying to protect the stormwater funding in the now Resiliency Fund to smooth out the inequities of how the stormwater rates work. That is one lens they use as they try to balance the different issues. Commissioner Richardson remembers a chart discussed at Finance and Economic Resiliency Committee where they were with water with rates versus other communities and requested to have that information to share with the Body for Second Reading. If they take money out of a pool of money to reduce something, then they have to raise money for stormwater, so these are all valid points, and the item has been moved and seconded. He asked staff to look at the issue and be more even prepared if that is possible at the next cycle. Mr. Coley showed the Comparison of Monthly Charges chart shared at Finance and Economic Resiliency Committee and shows how they stack up by neighborhood. He pointed out that the chart depicts each community represented, those with a star indicate that they are going through a rate survey and rate analysis to determine what their rates should be. Commissioner Richardson requested John Woodruff to prepare a similar chart on stormwater on Second Reading. John Woodruff to handle. Page 44 of 102 Page 501 of 1707 After Action November 18, 2020 City of Miami Beach City Commission Meeting Mayor Gelber added that things get kicked down the road and things need to catch up, but they will have an enormous amount of stormwater cost over the next 20 years, and the program is not funded, so where that money comes from, how they spend it or who pays for it is a big issue for them. Part of the challenge is that they have done a lot of work already, others have not even started, so at some point they need to be transparent with the public and let people know that this is what they need to do and what it might cost. It is not fair to have someone else catch up. Commissioner Richardson will work with the Administration, as Sponsor of the Ordinance, to make sure they are prepared to discuss the item on Second Reading. Roll Call taken. 6:23:05 p.m. R5 S AN ORDINANCE OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, AMENDING CHAPTER 82 OF THE CODE OF THE CITY OF MIAMI BEACH, FLORIDA, ENTITLED "PUBLIC PROPERTY," BY AMENDING ARTICLE IV, ENTITLED "USES IN PUBLIC RIGHTS-OF-WAY," BY AMENDING DIVISION 5, ENTITLED "SIDEWALK CAFES," BY AMENDING SUBDIVISION I, ENTITLED "GENERALLY", BY AMENDING SECTION 82-371 THEREOF, ENTITLED "CIVIL FINES AND PENALTIES; DENIAL OF FUTURE PERMITS TO REPEAT VIOLATORS; ENHANCED PENALTIES," BY SETTING FORTH ADDITIONAL ENHANCED PENALTIES TO BE IMPOSED FOR VIOLATIONS OF THE SIDEWALK CAFE CODE OF CONDUCT; AND PROVIDING FOR REPEALER, SEVERABILITY, CODIFICATION, AND AN EFFECTIVE DATE. First Reading Office of the City Attorney Sponsored by Mayor Dan Gelber ACTION: Ordinance not adopted on First Reading. Item deferred to December 9, 2020 or a Special Meeting to be scheduled, whichever is earlier. Item heard with R5 0 and R5 P. Title of the Ordinance read into the record. Lilia Cardillo to place on the Special Commission Agenda, if received. Thomas Mooney to handle. DIRECTION: R5 0, R5 P & R5 S to be placed at the December 9, 2020 Commission Meeting, or earlier if a Special Meeting (COW) is called; Michele Burger to schedule. 12:21:44 p.m. R5 T BUILDING PERMIT REPRIEVE PROGRAM AN ORDINANCE OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, AMENDING CHAPTER 14 OF THE CODE OF THE CITY OF MIAMI BEACH, ENTITLED "BUILDING REGULATIONS," BY AMENDING ARTICLE II, ENTITLED "CONSTRUCTION STANDARDS,"BY AMENDING DIVISION IV THEREOF, ENTITLED"BUILDING PERMIT REPRIEVE PROGRAM," BY AMENDING SECTIONS 14-85, AND 14-87 TO PROVIDE FOR THE ONE YEAR PERMIT REPRIEVE PROGRAM FOR OWNERS OF SINGLE FAMILY RESIDENTIAL, MULTI- FAMILY RESIDENTIAL, MIXED USE OR COMMERCIAL PROPERTIES WHO HAVE FAILED TO OBTAIN A BUILDING PERMIT(S), OR HAVE EXPIRED PERMITS; PROVIDING FOR CODIFICATION, REPEALER, SEVERABILITY, AN EFFECTIVE DATE, AND A SUNSET PROVISION. First Reading Building Sponsored by Commissioner Micky Steinberg Page 45 of 102 Page 502 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 1 of 101 IN THE UNITED STATES DISTRICT COURT FOR THE SOUTHERN DISTRICT OF FLORIDA UNITED STATES OF AMERICA, ) the STATE OF FLORIDA DEPARTMENT ) OF ENVIRONMENTAL PROTECTION, ) and the STATE OF FLORIDA, ) Plaintiffs, ) Case: No. 1:12-cv-24400-FAM ) v. ) CONSENT DECREE ) MIAMI-DADE COUNTY, ) FLORIDA, ) Defendant. ) ) -i- Page 503 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 2 of 101 TABLE OF CONTENTS I. JURISDICTION AND VENUE 9 II. APPLICABILITY 10 III. OBJECTIVES 11 IV. DEFINITIONS 12 V. REVIEW,APPROVAL AND IMPLEMENTATION OF DELIVERABLES . . .18 VI. COMPLIANCE REQUIRMENTS 22 17. Obligation to Perform Work 22 18. Continuation of Capacity, Management, Operations and Maintenance ("CMOM")Programs of the First Partial Consent Decree and Second and Final Partial Consent Decree 23 (a). Adequate Pumping, Transmission and Treatment Capacity Program . . . . 23 (b). Pump Station Remote Monitoring Program 24 (c). WCTS Model 25 (d). Spare Parts Program 28 (e). Volume Sewer Customer Ordinance Program 28 19. New CMOM Programs 31 (a). Fats, Oils and Grease("FOG") Control Program 31 (b). Sewer Overflow Response Plan("SORP") 34 (c). Information Management System("IMS") Program 38 (d). Sewer System Asset Management Program 40 (e). Gravity Sewer System Operations and Maintenance Program 41 (f). Pump Station Operations and Preventative Maintenance Program 44 (g). Force Main Operations, Preventative Maintenance and Assessment/Rehabilitation Program 47 (h). WWTP Operations and Maintenance Program 53 (i). Specific Capital Improvement Projects 57 (j). Financial Analysis Program 58 VII. CIVIL PENALTY 60 VIII. SUPPLEMENTAL ENVIRONMENTAL PROJECT 62 IX. REPORTING REQUIREMENTS 65 -ii- Page 504 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 3 of 101 X. STIPULATED PENALTIES 68 XI. FORCE MAJEURE 75 XII. DISPUTE RESOLUTION 77 XIII. RIGHT OF ENTRY AND INFORMATION COLLECTION AND RETENTION 80 XIV. NOT A PERMIT/COMPLIANCE WITH OTHER STATUTES/ REGULATIONS 82 XV. EFFECT OF SETTLEMENT/RESERVATION OF RIGHTS 83 XVI. COSTS 85 XVII. NOTICES 85 XVIII. DATE OF ENTRY 88 XIX. RETENTION OF JURISDICTION 88 XX. MODIFICATION 88 XXI. TERMINATION 89 XXII. PUBLIC PARTICIPATION 90 XXIII. SIGNATORIES/SERVICE 90 XXIV. INTEGRATION 91 XXV. FINAL JUDGMENT 91 XXVI. APPENDICES 91 -111- Page 505 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 4 of 101 WHEREAS,Plaintiff,the United States of America("United States"), by the authority of the Attorney General of the United States and through its undersigned counsel, acting at the request and on behalf of the United States Environmental Protection Agency("EPA"), filed a Complaint on December 13, 2012 alleging that the Defendant,Miami-Dade County, Florida ("Miami-Dade"),has violated and continues to violate Sections 301 of the Clean Water Act, 33 U.S.C. § 1311 ("CWA"), and the terms and conditions of its National Pollutant Discharge Elimination System ("NPDES")permits issued under Section 402 of the CWA, 33 U.S.C. § 1342; WHEREAS, Plaintiff, the State of Florida Department of Environmental Protection ("FDEP"),joined in the Complaint and seeks injunctive relief and civil penalties for Miami- Dade's alleged violations of the Florida Air and Water Pollution Control Act, Chapter 403 of the Florida Statutes ("Fla. Stat.")and applicable rules of the Florida Administrative Code ("Fla. Admin. Code")promulgated thereto; WHEREAS,FDEP has been authorized by EPA to administer the NPDES program in the State of Florida pursuant to Section 402(b)of the CWA, 33 U.S.C. § 1342(b); WHEREAS, the State of Florida is a Plaintiff in this action, satisfying the requirements of Section 309(e)of the CWA, 33 U.S.C. § 1319(e),which requires the state in which a municipality is located to be joined as a party whenever a municipality is a party to a civil action brought by the United States under Section 309 of the CWA; WHEREAS,Miami-Dade is a political subdivision of the State of Florida and a "municipality"pursuant to Section 502 of the CWA, 33 U.S.C. § 1362; -1- Page 506 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 5 of 101 WHEREAS, Miami-Dade owns and operates a publically owned treatment works ("POTW")consisting of a municipal wastewater collection and transmission system("WCTS"), which is designed to collect and convey municipal sewage (domestic, commercial and industrial), and three(3)municipal wastewater treatment plants: the North District Wastewater Treatment Plant("North District WWTP"),the Central District Wastewater Treatment Plant ("Central District WWTP") and the South District Wastewater Treatment Plant("South District WWTP"); WHEREAS,Miami-Dade's WCTS is a separate system from Miami-Dade's storm water conveyance system; WHEREAS, Miami-Dade's POTW is one of the largest public utilities in the United States,providing both water and wastewater service to a population of over 2 million with 336,000 retail sewer accounts as well as fifteen(15)Volume Sewer Customers and numerous private collection systems;the POTW consists of three(3)regional WWTPs, 1,035 Pump Stations,roughly 910 miles of Force Main and approximately 3,071 miles of Gravity Sewer interceptors, Gravity Sewers and siphons; additionally,Miami-Dade is responsible for an estimated 2,241 miles of public laterals, for a total collection and transmission system of nearly 6,000 miles; WHEREAS, the Volume Sewer Customers are responsible for collection and transmission systems totaling nearly 1,200 miles; WHEREAS,Miami-Dade estimates that at least 10%of its Force Mains and Gravity Sewer interceptors are greater than fifty(50) years old, at least 42% are twenty-five(25)to fifty -2- Page 507 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 6 of 101 (50)years old, at least 26% are less than twenty-five(25)years old, and 22% are of unknown age; WHEREAS,the North District WWTP is regulated pursuant to NPDES Permit Number FL0032182, issued to Miami-Dade by FDEP pursuant to Section 402 of the CWA, 33 U.S.C. § 1342, Chapter 403 Fla. Stat. and applicable rules of the Fla. Admin. Code; WHEREAS,the North District WWTP is also regulated pursuant to Florida Permit Number 0057792-009-UO, issued by FDEP to Miami-Dade pursuant to the Underground Injection Control requirements and regulations of the Safe Drinking Water Act, 42 U.S.C. § 300h, and Chapter 403 Fla. Stat. and applicable rules of the Fla. Admin. Code, as its treated wastewater is emplaced subsurface through well injection; WHEREAS,the Central District WWTP is regulated pursuant to NPDES Permit Number FL0024805, issued to Miami-Dade by EPA pursuant to Section 402 of the CWA, 33 U.S.C. § 1342, as the ocean outfall for the Central District WWTP extends into federal waters; WHEREAS,the Central District WWTP is also regulated pursuant to Florida Permit Number FLA024805, issued by FDEP to Miami-Dade pursuant to Chapter 403 Fla. Stat. and applicable rules of the Fla. Admin. Code; WHEREAS,the South District WWTP is regulated pursuant to Permit Number FLA042137, issued by FDEP to Miami-Dade pursuant to Chapter 403 Fla. Stat. and applicable rules of the Fla. Admin. Code; WHEREAS,the South District WWTP is also regulated pursuant to Florida Permit Numbers 61787-022-UO and 61787-023-UC, issued by FDEP to Miami-Dade pursuant to the Underground Injection Control requirements and regulations of the Safe Drinking Water Act, 42 -3- Page 508 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 7 of 101 U.S.C. § 300h, and Chapter 403 Fla. Stat. and applicable rules of the Fla. Admin. Code, as its treated wastewater is emplaced subsurface through well injection; WHEREAS, on January 13, 1994,the United States District Court, Southern District of Florida, entered the First Partial Consent Decree resolving certain claims brought by the United States against Miami-Dade in a complaint pursuant to Section 504 of the CWA, 33 U.S.C. § 1364, concerning the alleged threat presented by Miami-Dade's continued use of the seventy- two(72) inch Force Main that conveyed untreated wastewater from the City of Miami under Biscayne Bay to the Central District WWTP; WHEREAS,the First Partial Consent Decree required Miami-Dade to implement certain injunctive relief measures, including measures to address the alleged threat presented by Miami- Dade's continued use of the above-referenced seventy-two (72) inch Force Main; WHEREAS,the State was identified in the First Partial Consent Decree as a statutory defendant pursuant to Section 309(e)of the CWA, 33 U.S.C. § 1319(e); WHEREAS, on September 12, 1995,the United States District Court, Southern District of Florida, entered the Second and Final Partial Consent Decree resolving the outstanding claims brought by the United States against Miami-Dade in the complaint pursuant to Sections 301, 309(b) and(d), and 402 of the CWA, 33 U.S.C. §§ 1311, 1319(b)and(d), and 1342, alleging that the discharge of untreated wastewater from Miami-Dade's WCTS without a permit(also known as "Sanitary Sewer Overflows" or"SSOs") constitutes a violation of the CWA, the regulations promulgated thereunder, and the various terms and conditions of the NPDES Permits; -4- Page 509 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 8 of 101 WHEREAS, the Second and Final Partial Consent Decree required Miami-Dade to implement certain injunctive relief measures to address the SSOs from Miami-Dade's WCTS; WHEREAS,the State was identified in the Second and Final Partial Consent Decree as a statutory defendant pursuant to Section 309(e) of the CWA, 33 U.S.C. § 1319(e); WHEREAS, since entry of the First Partial Consent Decree and the Second and Final Partial Consent Decree,Miami-Dade completed over 1,000 milestones and has successfully complied with and/or completed a substantial portion of the injunctive relief measures required by both the First Partial and Second and Final Partial Consent Decrees; WHEREAS,Miami-Dade contends that from fiscal year 1995 to fiscal year 2011 it has spent approximately$1.8 billion upgrading its wastewater infrastructure and achieving significant progress in implementing and improving Capacity, Management, Operations and Maintenance("CMOM")programs in compliance with the requirements of various consent decrees and settlement agreements including, without limitation,the First Partial Consent Decree, the Second and Final Partial Consent Decree, and FDEP's Settlement Agreement System Wide and Settlement Agreement Cross Bay Line; and as a result,the number and volume of SSOs have been significantly reduced and with no capacity-related SSOs in the WCTS for the period from 2002 through October 2011 despite the increase in service area population and Hurricanes Wilma and Katrina; WHEREAS, Miami-Dade contends that, as a result of the First Partial Consent Decree and the Second and Final Partial Consent Decree, it has implemented and continues to implement a$300 million Pump Station Improvement Program ("PSIP")to upgrade the WCTS including Pump Stations and Force Mains pursuant to which each Pump Station had to be -5- Page 510 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 9 of 101 certified as capable of meeting a nominal average pump operating time("NAPOT")of less than or equal to 10 hours per day; and Pump Stations exceeding the NAPOT criteria had to have a Remedial Action Plan and no building permits could be issued for connections to WCTS upstream of that station; and as a result, a total of 666 Remedial Action Plans were prepared and submitted to EPA through June 30, 2012, and a total of 664 Pump Stations and 222 Force Main projects have been completed; WHEREAS, Miami-Dade contends that, as a result of the First Partial Consent Decree and the Second and Final Partial Consent Decree,it has implemented an Infiltration/Exfiltration/Inflow("I/E/I")Program to minimize the amount of groundwater infiltration,to redirect rainwater inflow from the sanitary sewers and to minimize potential leakage of raw sewage from defective sewers resulting in more than 32,000 mandated repairs being completed and, as of December 31, 2011 an estimated 127 million gallons per day("mgd") of I/I being removed from the WCTS; WHEREAS, the First Partial Consent Decree and the Second and Final Partial Consent Decree mandated improvements in fats, oils and grease("FOG") control and volume customer control resulting in Miami-Dade adopting the following ordinances: (1) Grease Trap Ordinance, Sections 24-15 and 24-18 of the Code of Miami-Dade County, June 21, 1994; and(2) Volume Sewer Customer Ordinance, Section 24-42.2 of the Code of Miami-Dade County,November 12, 1997; WHEREAS,the Parties recognize that since entry of the First Partial Consent Decree and the Second and Final Partial Consent Decree, conditions within and circumstances surrounding -6- Page 511 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 10 of 101 Miami-Dade's WCTS and WWTPs have changed over the last eighteen(18)years, including, in particular, the causes and locations of SSOs; WHEREAS, in April 2011,Miami-Dade conducted a CMOM Program self assessment to review its current programs to determine how these programs should be modified in order to more effectively address SSOs and improve system performance; and on May 1, 2011,Miami- Dade submitted to EPA a CMOM Report; WHEREAS, as a result of such changed circumstances and conditions and the issues identified in Miami-Dade's self-assessment, the Parties recognize that appropriate modifications and updates to the required injunctive relief terms of both the First Partial Consent Decree and the Second and Final Partial Consent Decree are warranted; WHEREAS, it is recognized that there are Volume Sewer Customers that own and operate their own wastewater collection and transmission systems that discharge into Miami- Dade's WCTS; WHEREAS, the Parties intend for the terms and conditions of this Consent Decree to replace and supersede in their entirety the terms and provisions of both the First Partial Consent Decree and the Second and Final Partial Consent Decree, and the Parties request that the Court terminate both the First Partial Consent Decree and the Second and Final Partial Consent Decree upon entry of this Consent Decree; WHEREAS, Miami-Dade has reported to EPA and FDEP within the last five(5)years numerous SSOs from its WCTS, including a number of large volume SSOs from ruptured Force Mains; -7- Page 512 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 11 of 101 WHEREAS,Miami-Dade has also reported to EPA and FDEP within the last five(5) years a number of exceedances of the effluent limitations in the NPDES Permits; WHEREAS, EPA and FDEP have inspected Miami-Dade's WCTS and WWTPs and have discovered a number of improper management,operations, and maintenance practices; WHEREAS, the United States and FDEP contend that these SSOs; effluent limit exceedances; and improper management, operation, and maintenance practices are violations of the CWA, Fla. Stat.,Fla. Admin. Code, and NPDES Permits; WHEREAS, Miami-Dade has paid to FDEP civil penalties to settle notices of SSOs as follows: $9,500.00 for a 2006 SSO as memorialized in Short Form Consent Order("SFCO") No. 06-2308; $8,500.00 for a 2006 SSO as memorialized in SFCO 06-2309; $10,000.00 for a 2007 SSO as memorialized in SFCO 07-1185; $7,500.00 for a 2007 SSO as memorialized in SFCO 07-1186; and $10,000.00 for a 2010 SSO as memorialized in SFCO 08-0050; WHEREAS, this Consent Decree requires Miami-Dade to develop, submit, finalize, and implement plans for the continued improvement of its WCTS and WWTPs to eliminate,reduce, prevent or otherwise control SSOs; to correct effluent limit violations; and to properly manage, operate and maintain its WCTS and WWTPs; WHEREAS,the Parties acknowledge that, in 2008,the State of Florida enacted Chapter 2008-232,Laws of Florida which prohibits, in pertinent part, construction of new ocean outfalls and requires that all six(6) ocean outfalls in Florida cease using the outfalls as the primary means of wastewater disposal by December 31, 2025; and that wastewater facilities that discharged wastewater through an ocean outfall on July 1,2008, are required to install a functioning reuse system (providing beneficial reuse of a significant percentage of the outfall -8- Page 513 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 12 of 101 flow amounts)no later than December 31, 2025, and submit a detail implementation plan by July 1, 2013; WHEREAS, the Parties acknowledge that the implementation of this legislation may impact the scope and scheduling of the capital improvements projects identified in Appendix D of this Consent Decree; WHEREAS, the Parties to this Consent Decree have negotiated in good faith and have reached a settlement of the issues raised in the Complaint; WHEREAS,Miami-Dade's agreement to this Consent Decree is not an admission of liability to the allegations arising out of transactions or occurrences alleged in the Complaint, and except for Miami-Dade's consent to jurisdiction and venue as provided in Section I of this Consent Decree(Jurisdiction and Venue),nor is it an adjudication or admission of any fact or law; WHEREAS, the Parties recognize, and the Court by entering this Consent Decree finds, that this Consent Decree has been negotiated by the Parties in good faith and will avoid litigation between the Parties and that this Consent Decree is fair,reasonable, and in the public interest. NOW THEREFORE, with the consent of the Parties, it is hereby ORDERED, ADJUDGED and DECREED as follows: I. JURISDICTION AND VENUE 1. This Court has jurisdiction over the subject matter of this action,pursuant to 28 U.S.C. §§ 1331, 1345, and 1355, and Sections 309(b) and 504 of the CWA, 33 U.S.C. §§ 1319(b)and 1364, and over the Parties. This Court has supplemental jurisdiction over the state law claims asserted by FDEP pursuant to 28 U.S.C. § 1367. Venue is proper in the Southern -9- Page 514 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 13 of 101 District of Florida pursuant to Section 309(b) of the CWA, 33 U.S.C. § 1319(b), and 28 U.S.C. §§ 1391(b) and 1395(a),because the violations alleged in the Complaint are alleged to have occurred in this judicial district. For purposes of this Consent Decree, or any action to enforce this Consent Decree, Miami-Dade consents to the Court's jurisdiction over this Consent Decree and any such action and over Miami-Dade and consents to venue in this judicial district. 2. For purposes of this Consent Decree,Miami-Dade agrees that the Complaint states claims upon which relief may be granted pursuant to Sections 309(b) and 504 of the CWA, 33 U.S.C. §§ 1319(b) and 1364; Fla. Stat. §§ 403.161,403.141, 403.131 and 403.121. II. APPLICABILITY 3. The obligations of this Consent Decree apply to and are binding upon the United States, EPA,the State,FDEP, and upon Miami-Dade and any successors, assigns, or other entities or persons otherwise bound by law. 4. No transfer of ownership or operation of any portion of the WCTS or of any WWTP,whether in compliance with the procedures of this Paragraph or otherwise, shall relieve Miami-Dade of its obligation to ensure that the terms of this Consent Decree are implemented. At least thirty(30)Days prior to such transfer,Miami-Dade shall provide a copy of this Consent Decree to the proposed transferee and shall simultaneously provide written notice of the prospective transfer,together with a copy of the proposed written agreement, to the United States and FDEP in accordance with Section XVII of this Consent Decree (Notices). Miami-Dade shall require, as a condition of any sale or transfer, that the purchaser or transferee agrees in writing to be bound by this Consent Decree and submit to the jurisdiction of the Court for its enforcement. -10- Page 515 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 14 of 101 Any attempt to transfer ownership or operation of any portion of the WCTS or of any WWTP without complying with this Paragraph constitutes a violation of this Consent Decree. 5. Miami-Dade shall provide or otherwise make available a copy of this Consent Decree to all officers, employees, and agents whose duties might reasonably include compliance with any provision of this Consent Decree, as well as to any contractor retained to perform work required under this Consent Decree. Miami-Dade shall condition any such contract upon performance of the work in conformity with the terms of this Consent Decree. 6. In any action to enforce this Consent Decree, Miami-Dade shall not raise as a defense the failure by any of its officers, directors, employees, agents, or contractors to take any actions necessary to comply with the provisions of this Consent Decree. III. OBJECTIVES 7. The express purpose of the Parties entering into this Consent Decree is for Miami-Dade to take all necessary measures, consistent with the objectives of the CWA, to achieve full compliance with the CWA,the regulations promulgated thereunder,Fla. Stat. Chapter 403, and the applicable Fla. Admin. Code Rules promulgated thereto, as well as the NPDES Permits, with the goal of eliminating all SSOs and Prohibited Bypasses. All plans, reports, construction, remedial maintenance, and other obligations in this Consent Decree, and under any amendment to this Consent Decree, shall have the objective of ensuring that Miami- Dade complies with the CWA, Fla. Stat. Chapter 403, all applicable federal and state regulations, and the terms and conditions of the NPDES Permits. -11- Page 516 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 15 of 101 IV. DEFINITIONS 8. Terms used in this Consent Decree that are defined in the CWA or in regulations promulgated pursuant to the CWA shall have the meanings assigned to them in the CWA, 33 U.S.C. §§ 1251 et seq., and regulations promulgated under the CWA,unless otherwise provided in this Consent Decree. Whenever the terms set forth below are used in this Consent Decree, the following definitions shall apply: (a). "Building Backup"shall mean a wastewater release or backup into a building that is caused by blockages, flow conditions, or other malfunctions in Miami-Dade's WCTS. A wastewater backup or release that is caused by blockages, flow conditions, or other malfunctions of a Private Lateral is not a Building Backup. (b). "Calendar Quarter" shall mean the three(3)Month periods ending on March 31, June 30, September 30, and December 31. (c). "Calendar Year"shall mean the twelve (12)Month period starting on January 1 and ending on December 31. (d). "Certification" or"Certify"when used in this Consent Decree shall require Miami-Dade to comply with Paragraph 16 of this Consent Decree. (e). "CMOM"or"Capacity,Management, Operations, and Maintenance" shall mean a program of accepted industry practices to properly manage, operate and maintain sanitary wastewater collection,transmission and treatment systems, investigate capacity- constrained areas of these systems, and respond to SSO events. (f). "Complaint"shall mean the complaint filed by the United States,the State, and FDEP in this action. -12- Page 517 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 16 of 101 (g). "Consent Decree"shall mean this Consent Decree and all appendices attached hereto(listed in Section XXVI.(Appendices)). In the event of a conflict between this document and any appendix,this document shall control. (h). "CWA" shall mean the Clean Water Act, as amended, 33 U.S.C. §§ 1251, et seq. (i) "Date of Entry" shall have the definition provided in Section XVIII(Date of Entry). (j). "Date of Lodging" shall mean the date this Consent Decree is filed for lodging with the Clerk of the Court for the United States District Court for the Southern District of Florida. (k). "Day" shall mean a calendar day unless expressly stated to be a business day. In computing any period of time under this Consent Decree, where the last day would fall on a Saturday, Sunday, or federal holiday, the period shall run until the close of business of the next business day. (1). "Defendant" shall mean Miami-Dade County,Florida and any successor thereto. (m). "Deliverable" shall mean any written document required to be prepared and/or submitted by or on behalf of Miami-Dade pursuant to this Consent Decree. (n). "DOJ"shall mean the United States Department of Justice. (o). "EPA" shall mean the United States Environmental Protection Agency and any of its successor departments or agencies. -13- Page 518 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 17 of 101 (p). "Effective Date" shall mean the Date of Entry or six(6)Months after the Date of Lodging, whichever occurs first. (q). "FDEP"shall mean the State of Florida Department of Environmental Protection and any successor departments or agencies of the State. (r). "Force Main" shall mean any pipe that receives and conveys,under pressure,wastewater from the discharge side of a pump. A Force Main is intended to convey wastewater under pressure. (s). "Gravity Sewer Line"or"Gravity Sewer" shall mean a pipe that receives, contains and conveys wastewater not normally under pressure, but is intended to flow unassisted under the influence of gravity. (t). "Infiltration" as defined by 40 C.F.R. § 35.2O05(b)(20) shall mean water other than wastewater that enters the WCTS (including sewer service connections and foundation drains) from the ground through such means as defective pipes, pipe joints, connections, or manholes. (u). "Inflow" as defined by 40 C.F.R. § 35.2O05(b)(21) shall mean water other than wastewater that enters the WCTS (including sewer service connections) from sources such as,but not limited to, roof leaders, cellar drains,yard drains, area drains, drains from springs and swampy areas, manhole covers, cross connections between storm sewers and sanitary sewers, catch basins, cooling towers, storm water, surface runoff, street wash waters, or drainage. (v). "I/I" shall mean the total quantity of water from Inflow,Infiltration, and rainfall-induced Inflow and Infiltration without distinguishing the source. -14- Page 519 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 18 of 101 (w). "Miami-Dade" shall mean Miami-Dade County, Florida, including all of its departments, agencies, instrumentalities such as the Water and Sewer Department and the Department of Regulatory and Economic Resources, and any successor thereto. (x). "Month" shall mean one (1) calendar month running from the numbered day to the same numbered day of the following calendar month, regardless of whether the particular month has 28, 29, 30 or 31 days. In the event a triggered event would occur on a day of the month which does not exist(for example, on February 30), then the event shall be due on the first day of the following month(for example,March 1). (y). "NPDES" shall mean the National Pollutant Discharge Elimination System authorized under Section 402 of the CWA, 33 U.S.C. § 1342. (z). "NPDES Permits" shall mean the most recently issued NPDES permits issued to Miami-Dade for its WWTPs. (aa). "Ocean Outfall Legislation" shall mean the part of Chapter 2008-232, Laws of Florida, that has been codified in Fla. Stat. Section 403.086(9)(a)-(j). (bb). "Paragraph" shall mean a portion of this Consent Decree identified by an Arabic numeral. (cc). "Parties" shall mean the United States of America on behalf of EPA, the State of Florida,FDEP, and Miami-Dade. (dd). "Plaintiffs"shall mean the United States of America on behalf of EPA, the State of Florida, and FDEP. (ee). "Private Lateral" shall mean that portion of a sanitary sewer conveyance pipe that extends from a single-family, multi-family, apartment, or other dwelling unit or -15- Page 520 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 19 of 101 commercial or industrial structure to which wastewater service is or has been provided up to the property line of such structure. (ff). "Prohibited Bypass" shall mean the intentional diversion of waste streams from any portion of a treatment facility which is prohibited pursuant to the terms set forth at 40 C.F.R. § 122.41(m). (gg). "Public Document Repository"or"PDR" shall mean the Miami-Dade Water and Sewer Department located at 3071 SW 38th Avenue and the Miami-Dade Water and Sewer Department's website, miamidade.gov/water. (hh). "Pump Station" shall mean facilities comprised of pumps which pump wastewater to a higher hydraulic elevation, including all related electrical,mechanical, and structural systems necessary to the operation of that Pump Station. (ii). "Sanitary Sewer Overflow" or"SSO"shall mean any discharge of wastewater to waters of the United States or the State from Miami-Dade's WCTS through a point source not permitted in any NPDES permit,as well as any overflow, spill, or release of wastewater to public or private property from the WCTS that may not have reached waters of the United States or the State, including all Building Backups. (jj). "Section" shall mean a portion of this Consent Decree identified by a Roman numeral. (kk). "Sewer System" shall mean the WCTS and the WWTPs. (11). "State" shall mean the State of Florida, including all of its departments, agencies, and instrumentalities. -16- Page 521 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 20 of 101 (mm). "Subparagraph" shall mean a portion of a paragraph identified by a lowercase letter, a lowercase Roman numeral, or a capital letter. (nn). "Timely"when applied to the submittal of a Deliverable shall mean submitted no later than the deadline established in this Consent Decree (or in a document approved pursuant to this Consent Decree) and containing all of the elements pertaining to the submittal as set forth in this Consent Decree(or in a document approved pursuant to this Consent Decree). "Timely," when applied to the implementation of any Work shall mean implemented no later than the deadline established in this Consent Decree (or in a document approved pursuant to this Consent Decree) and in accordance with the elements pertaining to such Work as set forth in this Consent Decree (or in a document approved pursuant to this Consent Decree). (oo). "United States" shall mean the United States of America, acting on behalf of EPA, including its departments, agencies, and instrumentalities. (pp). "Volume Sewer Customer" or"VSC" shall mean any entity or municipality serviced on a bulk basis (at a wholesale rate) by Miami-Dade within the territorial limits of Miami-Dade County, and currently includes the municipalities of Bal Harbour, Bay Harbor Islands, Coral Gables,Florida City, Homestead,Hialeah,Hialeah Gardens,Medley, Miami Beach,North Miami, Opa Locka,North Bay Village,North Miami Beach, Surfside and West Miami. (qq). "Wastewater Collection and Transmission System" or"WCTS" shall mean the wastewater collection and transmission systems, including all pipes, Force Mains, Gravity Sewer Lines, Pump Stations, manholes and appurtenances thereto, owned or operated by -17- Page 522 of 1707 r Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 21 of 101 Miami-Dade designed to collect and convey municipal sewage(domestic, commercial and industrial)to Miami-Dade's WWTPs. (rr). "Wastewater Treatment Plant" or"WWTP" shall mean devices or systems used in the storage,treatment,recycling, and reclamation of municipal wastewater. For purposes of this Consent Decree,this definition shall include all facilities owned, managed, operated, and maintained by Miami-Dade, including but not limited to the North District WWTP,the Central District WWTP,the South District WWTP, and all components of those plants. (ss). "Work" shall mean all activities Miami-Dade is required to perform under this Consent Decree. V. REVIEW,APPROVAL AND IMPLEMENTATION OF DELIVERABLES 9. Public Document Repository. No later than one business day from the submission of a Deliverable to EPA and FDEP pursuant to Sections VI(Compliance Requirements),VIII (Supplemental Environmental Project) and IX (Reporting Requirements) of this Consent Decree,Miami-Dade shall make available a copy of each Deliverable in the Public Document Repository("PDR"). The Miami-Dade Water and Sewer Department office located at 3071 SW 38th Avenue and the Miami-Dade Water and Sewer Department's website, http://www.miamidade.gov/water, shall constitute the PDR. Miami-Dade shall bear the sole responsibility for depositing all Deliverables in the PDR. Additionally,Miami-Dade shall create a form on the Miami-Dade Water and Sewer Department's website that will allow any person or entity to register online to receive an electronic notice that a Deliverable is available in the PDR. Miami-Dade shall not be responsible for changes in electronic addresses. A registered person or entity shall not be a third-party beneficiary of this Agreement. Within seven (7)Days after -18- Page 523 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 22 of 101 EPA's approval, approval upon conditions, or modification by EPA pursuant to this Section, if revised,Miami-Dade shall place a copy of such revised version of the Deliverable in the PDR. Every registered person or entity shall also receive an electronic notice that such revised version of the Deliverable is available in the PDR. Such copy shall replace all previous copies of that Deliverable in the PDR, and shall remain in the PDR until termination of this Consent Decree. In addition,Miami-Dade shall maintain in the PDR a listing of all Deliverables. 10. EPA Action on Deliverables. After review of any Deliverable that is required to be submitted pursuant to this Consent Decree,EPA, after consultation with FDEP, shall in writing: (a) approve the submission; (b) approve part of the submission and disapprove the remainder; or(c) disapprove the submission. If EPA approves only in part or disapproves entirely a submission pursuant to Subparagraphs 10(b) and(c) above, EPA shall provide a written explanation of how the submission is inconsistent with the applicable criteria set forth in the relevant Sections of this Consent Decree. EPA agrees to use best efforts to expeditiously review and comment on Deliverables. If EPA issues written comments and decisions on any Deliverable more than sixty(60) Days after receipt of such Deliverable, any subsequent deadline or milestone that is dependent upon such comments or decisions shall be extended. The length of the extension shall be determined by calculating the number of Days between EPA's receipt of the Deliverable and the date of Miami-Dade's receipt of EPA's written response, less sixty (60)Days. Within thirty (30)Days of the date that Miami-Dade knows or should know of a deadline or milestone that Miami-Dade believes is extended under this Paragraph,Miami-Dade shall inform EPA, in writing, of its belief and the amount of time Miami-Dade believes the deadlines or milestones are extended. If EPA disagrees with Miami-Dade's determination that a -19- Page 524 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 23 of 101 deadline is dependent upon such comments or decisions, EPA shall inform Miami-Dade in writing. Miami-Dade may invoke Dispute Resolution pursuant to Section XII (Dispute Resolution)regarding EPA's conclusion regarding whether a deadline is dependent upon such comments or decisions. 11. Approved Deliverables. If a Deliverable is approved by EPA in its entirety pursuant to Subparagraph 10(a),Miami-Dade shall take all actions required by the Deliverable in accordance with the schedules and requirements of the Deliverable as approved. If the Deliverable is approved only in part pursuant to Subparagraph 10(b),Miami-Dade shall,upon written direction from EPA, after consultation by EPA with FDEP,take all actions required by the approved plan,report, or other item that EPA, after consultation by EPA with FDEP, determines are technically severable from any disapproved portions and not directly dependent upon an unapproved portion of the Deliverable, subject to Miami-Dade's right to dispute only the specified conditions or the disapproved portions,under Section XII of this Consent Decree (Dispute Resolution). Following EPA approval of any Deliverable or portion thereof, such Deliverable or portion thereof so approved shall be incorporated into and become enforceable under this Consent Decree, subject to Miami-Dade's right to dispute under Section XII of this Consent Decree(Dispute Resolution). 12. Disapproved Deliverables. If the Deliverable is disapproved in whole or in part pursuant to Subparagraph 10(b) or(c),Miami-Dade shall, within sixty (60)Days or such other time as EPA and Miami-Dade agree to in writing, correct all identified deficiencies and resubmit to EPA the Deliverable, or disapproved portion thereof, for approval, in accordance with Paragraphs 10 and 11, subject to Miami-Dade's right to dispute under Section XII of this -20- Page 525 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 24 of 101 Consent Decree(Dispute Resolution). If the resubmission is approved in whole or in part by EPA,Miami-Dade shall proceed in accordance with Paragraph 11. 13. Stipulated Penalties Accruing. Any stipulated penalties applicable to the original Deliverable, as provided in Section X of this Consent Decree (Stipulated Penalties), shall accrue during the sixty (60)-Day period or other specified period, but shall not be payable unless the resubmitted Deliverable is not Timely or is disapproved in whole or in part;provided that, if the original submission was so deficient as to constitute a material breach of Miami-Dade's obligations under this Consent Decree,the stipulated penalties applicable to the original submission shall be due and payable notwithstanding any subsequent resubmissions. 14. Resubmitted Deliverable. If a resubmitted Deliverable, or portion thereof, is disapproved in whole or in part,EPA, after consultation with FDEP, may again require Miami- Dade to correct any deficiencies, in accordance with Paragraph 12, or may itself correct any deficiencies, subject to Miami-Dade's right to invoke Dispute Resolution under Section XII of this Consent Decree (Dispute Resolution) and the right of EPA to seek stipulated penalties as provided in preceding Paragraph 13. Upon correction of any deficiencies, such resubmitted Deliverable or portion thereof will be incorporated into and become enforceable under this Consent Decree and shall be implemented by Miami-Dade according to the approved schedule subject to Miami-Dade's right to invoke Dispute Resolution. 15. Revisions to Deliverables. The Parties recognize that Miami-Dade may need or want to revise certain Deliverables during the term of this Consent Decree. Any such revision shall be considered a non-material change to this Consent Decree for purposes of Section XX (Modification). Miami-Dade must obtain EPA's prior written approval,after EPA consults with -21- Page 526 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 25 of 101 FDEP, of any revision to the substance of a Deliverable and shall place copies of any such revised Deliverable in the PDR and provide an electronic notice of such revised Deliverable to registered persons and entities in accordance with the provisions of Paragraph 9. Miami-Dade may revise the form of any Deliverable without consulting EPA or FDEP and shall place a copy of any such revised Deliverable in the PDR within seven (7)Days after making such revision. 16. Certification. In all Deliverables, notices, documents or reports submitted to the United States and FDEP pursuant to this Consent Decree, Miami-Dade shall,by a Miami-Dade senior management official, sign and certify such notices, documents and reports as follows: I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering such information, the information submitted is, to the best of my knowledge and belief true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. VI. COMPLIANCE REQUIREMENTS 17. Obligation to Perform Work. Upon the Effective Date of this Consent Decree, Miami-Dade shall implement the Work pursuant to this Consent Decree. Miami-Dade is responsible for ensuring that any contractors hired to perform Work pursuant to this Consent Decree comply with all applicable laws and with this Consent Decree. All Work shall be performed using sound engineering practices,which may include appropriate provisions of the -22- Page 527 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 26 of 101 most recent edition of the following publications: EPA's Handbook: Sewer System Infrastructure Analysis and Rehabilitation,EPA/625/6-91/030, 1991; EPA's Handbook: Condition Assessment of Wastewater Collection Systems (State of Technology Review Report), EPA/600/R-09/049,May 2009; EPA's Handbook: State of Technology Report for Force Main Rehabilitation, EPA/600/R-10/044, March 2010; Existing Sewer Evaluation and Rehabilitation, WEF Manual of Practice No. FD-6, 1994;Design of Wastewater and Stormwater Pumping Stations, WEF Manual of Practice No.FD-4; and Fla.Admin. Code. Rule 62-604; Gravity Sanitary Sewer Design and Construction, WEF Manual of Practice No. FD-5,2007; Wastewater Collection Systems Management, WEF Manual of Practice No. FD-7, 2009; and Recommended Standards for Wastewater Facilities,Health Education Services (a Division of Health Research, Inc.),2004. 18. Continuation of CMOM Programs of the First Partial Consent Decree and Second and Final Partial Consent Decree. (a). Adequate Pumping, Transmission and Treatment Capacity Program. Pursuant to Paragraph 16(C)of the First Partial Consent Decree(as amended by Paragraph 23 of the Second and Final Partial Consent Decree), Miami-Dade developed and implemented a program to ensure adequate transmission capacity for its Pump Stations and adequate treatment capacity for its WWTPs. Miami-Dade shall ensure adequate transmission and treatment capacity under the conditions provided for in Appendix A of this Consent Decree, attached hereto and incorporated herein. Within one hundred-eighty(180)Days of the Effective Date of this Consent Decree, Miami-Dade shall amend Section 24-42.3 of the Code of Miami-Dade County to incorporate the criteria in Appendix A. -23- Page 528 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 27 of 101 (b). Pump Station Remote Monitoring Program. Pursuant to Paragraph 14 of the Second and Final Partial Consent Decree, Miami-Dade developed and implemented a Supervisory Control and Data Acquisition ("SCADA")program for the installation and operation of remote monitoring equipment in all Pump Stations within the WCTS. Miami-Dade shall continue to implement this program as an enforceable obligation under this Consent Decree as set forth below: (i). Miami-Dade's Pump Station monitoring system shall continuously monitor, report and transmit information as follows: (A). For each Pump Station that does not have dry pits and that has no more than two (2)pumps of less than or equal to 25 horsepower per pump: (1) highwater level alarm in wet well; (2) Pump Station power failure; (3) D.C. low battery; and (4) remote signal failure alarm. (B). For each Pump Station, other than the Pump Stations described in (A) above: (1) operating hours after midnight for each sewage pump, total Pump Station operating hours after midnight, and number of pump starts; (2) wet well level with high and low level alarm set points; (3) kilowatts calculated from Pump Station amperage; (4) flow(instantaneous and average)determined from a flow meter or flow calculated based on pump(s) amperage and discharge pressure; -24- Page 529 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 28 of 101 (5) discharge pressure with high and low level alarm set points; and (6) minimum digital inputs, including high water level alarm in wet well, drywell flooding, intrusion alarm,A.C. Pump Station power failure, D.C. low battery and remote signal failure alarm. (ii). With respect to all Pump Stations, system monitoring data of wet well levels, Force Main pressures, and energy requirements (kilowatts) shall be stored in a historical database. In addition,the Pump Station operating hours for each pump shall be recorded Monthly with elapsed time meters and entered into a historical database. Miami-Dade shall use radio transceivers for the primary transmission of data. Where radio paths are unreliable in areas with heavy foliage or building structures, other remote terminal units or telephone dialers or alarm systems shall be used. Miami-Dade shall retain for each Month the 24-hour maximum and the Monthly average flow data until termination of this Consent Decree. (iii). In addition, as a continuing obligation under this Consent Decree, Miami-Dade shall require the installation of SCADA remote monitoring equipment as a condition of new construction for all new Pump Stations that it builds or receives from developers as a donation. SCADA remote monitoring equipment shall be installed within six(6) Months after Miami-Dade becomes operationally responsible for said Pump Station. (c). WCTS Model. Pursuant to Paragraph 16 of the Second and Final Partial Consent Decree,Miami-Dade developed and implemented a computerized collection and transmission system model to assist in the development and implementation of CMOM programs to optimize transmission capacity and to evaluate the impact of I/I rehabilitation projects; -25- Page 530 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 29 of 101 proposed modifications,upgrades and expansions to the WCTS; and performance of the WCTS. Miami-Dade shall continue to use and maintain this program as an enforceable obligation under this Consent Decree. (i). The WCTS Model required by this Paragraph shall, at a minimum, be capable of, and be used for,predicting: (A). Volume of wastewater flow in the Force Mains and the Major Gravity Sewer Lines, as defined in Subparagraph 18(c)(iii)(A)below, throughout Miami-Dade's WCTS; (B). Hydraulic pressure(psig) of wastewater at any point in Force Mains throughout Miami Dade's WCTS; (C). Flow capacity of each of the Pump Stations in Miami Dade's WCTS; (D). Flow capacity of Pump Stations with the back-up pump out of service; (E). Peak pumping rates for each Pump Station; and (F). The likelihood and location of SSOs and Surcharged Conditions, as defined in Subparagraph 18(c)(iii)(D)below, within a Pump Station's service area under conditions where the Pump Station's back-up pump is out-of-service and considering available wet well capacity, off-line storage capacity, and Normal In-Line Storage Capacity, as defined in Subparagraph 18(c)(iii)(B)below. (ii). The WCTS model shall also be capable of simulating all manifolded Force Mains and all private Pump Stations which manifold into Miami Dade's Force Main -26- Page 531 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 30 of 101 system. (iii). Definitions: For the purposes of this Paragraph only,the following phrases shall have the following meanings: (A). The phrase"Major Gravity Sewer Lines" shall mean all Gravity Sewer Lines that are twenty-four(24)inches in diameter or larger, all Gravity Sewer Lines that convey wastewater from one Pump Station service area to another Pump Station service area, and all Gravity Sewer Lines that have caused or contributed, or that Miami-Dade knows will likely cause or contribute to, a capacity-related SSO. (B). The phrase"Normal In-Line Storage Capacity" shall mean the available storage capacity within Miami-Dade's Gravity Sewer Lines, manholes and appurtenances which discharge to a Pump Station with wet well level no higher than the lower of one (1) foot below the annual low ground water table or,where suitable ground water instrumentation is available, one(1)foot below the current groundwater elevation. (C). The phrase"Peak Flow" shall mean the greatest flow in a sewer averaged over a sixty(60)minute period at a specific location in the WCTS expected to occur as a result of a representative two(2)-year twenty-four(24)-hour rain event as determined by the South Florida Water Management District. (D). The phrase"Surcharged Condition" shall mean the condition that exists when the wastewater flow resulting from a Peak Flow causes the wastewater level to exceed the elevation of the crown of the Pump Station influent sewer at the wet well. (iv). Notwithstanding the foregoing,Miami-Dade shall calibrate the WCTS model at least once every five (5)years following the Effective Date of this Consent -27- Page 532 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 31 of 101 Decree. Calibration work shall be summarized in a report which describes the calibration methodology including target allowable tolerances between model results and equivalent field values from SCADA, actual comparisons of the WCTS model results with equivalent field values from SCADA, general descriptions of adjustments made to the WCTS model, and areas for additional investigation for continued improvement of the model. The calibration report shall be made available to EPA and FDEP upon their request. Newly-constructed facilities including Pump Stations, Gravity Sewer Lines and Force Mains and associated initial and projected flows added to the WCTS shall be incorporated into the WCTS model within ninety(90) days of their incorporation into Geographic Information Systems ("GIS"). The system layout included in the WCTS model is based on importing the GIS layers for the WCTS. Procedures shall be developed so that updating of the GIS layers and the WCTS model are coordinated to the extent that the updates of the GIS WCTS layers are conveniently exportable to the WCTS model. All new facilities added to GIS will be imported into the model within ninety (90) days of their input into GIS. (d). Spare Parts Program. Pursuant to Paragraph 20 of the Second and Final Partial Consent Decree, Miami-Dade developed and implemented an inventory management program for spare parts for the WCTS. Miami-Dade shall continue to implement this program pursuant to Subparagraphs 19(e), (f}, (g),and(h) of this Consent Decree. (e). Volume Sewer Customer Ordinance Program. Pursuant to Paragraph 22 of the Second and Final Partial Consent Decree, Miami-Dade developed and implemented a Volume Sewer Customer Program("VSC Program") as codified in Section 24-42.2 of the -28- Page 533 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 32 of 101 Miami-Dade County Code ("VSC Ordinance")to eliminate or otherwise control SSOs from the WCTS and the collection and transmission systems of present and future VSCs. (i). Miami-Dade shall continue to implement the VSC Program as an enforceable obligation under this Consent Decree except as otherwise modified as set forth in Subparagraphs 18(e)(ii) and(iii)below. The existing VSC Program includes the following CMOM related programs: (A). An I/I evaluation and rehabilitation program to reduce I/I into VSC collection and transmission systems; (B). Identification and elimination of each illegal stormwater connection to the VSC collection and transmission systems; (C). Inspection and rehabilitation of each Pump Station within the VSC collection and transmission systems; (D). Installation and operation of remote monitoring equipment at each Pump Station within the VSC collection and transmission systems; (E). Creation and maintenance of a WCTS computer model for the VSC collection and transmission systems; (F). Implementation of maintenance and spare parts programs; and (G). A program for the reporting of unpermitted discharges and overflows from the VSC collection and transmission systems. (ii). Within four(4)Months of the Effective Date of this Consent Decree, Miami-Dade shall make changes to the VSC Program and the VSC Ordinance as follows: -29- Page 534 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 33 of 101 (A). Chapter 24-42.2(4) shall be modified to require that the system model be updated at intervals of no more than five(5) years; (B). The spare parts program required under Chapter 24-42.2(6) shall be changed to comply with Paragraph 18(e)(i)(F) and require that the listing of required spare parts shall be reviewed and updated annually; and (C). Chapter 24-42.2(1)(f)(iii) shall be modified to require that the system map provided to the Director annually shall be provided in an electronic format compatible with the Miami-Dade GIS system. (iii) Within four(4)Months of the Effective Date of this Consent Decree, Miami-Dade shall submit to EPA and FDEP for review and comment a proposed amendment to the VSC Ordinance which will require each existing and future VSC to implement the following items in accordance with an approved Plan of Compliance as defined in Appendix B and the scheduling requirements provided in Appendix B of this Consent Decree, attached hereto and incorporated herein: (A). A sewer overflow response plan consistent with the requirements of Paragraph 19(b) of this Consent Decree; (B). An information management system program consistent with the requirements of Paragraph 19(c) of this Consent Decree; (C). A sewer system asset management plan consistent with the requirements of Paragraph 19(d) of this Consent Decree; (D). A Gravity Sewer system operation and maintenance program consistent with the requirements of Paragraph 19(e) of this Consent Decree; -30- Page 535 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 34 of 101 (E). A Pump Station operations and preventative maintenance program consistent with the requirements of Paragraph 19(f) of this Consent Decree; and (F). A Force Main operations,preventative maintenance and assessment/rehabilitation program consistent with the requirements of Paragraph 19(g) of this Consent Decree. Within one hundred eighty(180) Days of receipt of EPA's approval of the proposed amendment to the VSC Ordinance, Miami-Dade shall enact the amendment. Subject to enactment of the amendment, Miami-Dade shall immediately undertake the implementation of such amended VSC Ordinance,which shall be incorporated into, and become enforceable under this Consent Decree. 19. New CMOM Programs. Miami-Dade shall develop and implement the CMOM programs as provided below. All CMOM programs shall be developed in accordance with EPA Region IV guidance, as set forth in Appendix C, attached hereto and incorporated herein. Miami-Dade shall ensure that each CMOM program has a written, defined purpose; a written, defined goal; is documented in writing with specific detail; is implemented by trained personnel; has established performance measures; and has written procedures for periodic review. (a). Fats, Oils and Grease("FOG") Control Program. Miami-Dade approved a Grease Trap Ordinance pursuant to the First Partial Consent Decree. Pursuant to the Grease Trap Ordinance, Miami-Dade implemented a FOG Control Program which allowed Miami-Dade to regulate industrial and commercial sources of oil and grease. Notwithstanding any improvements already achieved through the existing FOG Control Program,Miami-Dade shall review, evaluate and revise its Grease Trap Ordinance and FOG Control Program and submit to -31- Page 536 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 35 of 101 EPA and FDEP for review and comment a new FOG Control Program within eighteen(18) Months after the Effective Date of this Consent Decree. Miami-Dade shall continue to implement the existing FOG Control Program as an enforceable obligation under this Consent Decree until it implements a new FOG Control Program approved by EPA and FDEP as set forth below. At a minimum,the new FOG Control Program shall apply county-wide and include the following: (i). A FOG characterization study that shall identify the sources of FOG causing problems in the WCTS and the wastewater collection and transmission systems of the VSCs and the most appropriate method or mechanism for addressing those sources. (ii). The legal authority to control the discharge of FOG into the WCTS and the wastewater collection and transmission systems of the VSCs, including the ability to implement a permit and enforcement program for commercial and industrial sources. (iii). Specification of accepted devices to control the discharge of FOG into the WCTS and the wastewater collection and transmission systems of the VSCs. (iv). Establishment of standards for the design and construction of FOG control devices including standards for capacity and accessibility, site map, design documents and as-built drawings. (v). Establishment of FOG control device management, operations and maintenance standards, or best management practices,that address onsite record keeping requirements, cleaning frequency, cleaning standards, use of additives, and ultimate disposal. (vi). Establishment of construction inspection protocols, including scheduling, inspection report forms, and inspection record keeping requirements, to assure that -32- Page 537 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 36 of 101 FOG control devices are constructed in accordance with established design and construction standards. (vii). Establishment of compliance inspection protocols, including scheduling, inspection report forms, and inspection record keeping requirements to assure that FOG control devices are being managed, operated and maintained in accordance with the established management, operation and maintenance standards or best management practices. (viii). Establishment of a FOG disposal manifest system, with the included requirements that FOG and septage not be comingled and that the point of origin be specified on the manifest. (ix). Establishment of an enforcement program, including specific enforcement mechanisms,to ensure compliance with the FOG Control Program. (x). Establishment of a compliance assistance program to facilitate training of FOG generators and their employees. (xi). Establishment of a comprehensive public education program directed at reducing the amount of FOG entering the WCTS from residences. (xii). Establishment of staffing(technical and legal) and equipment requirements to ensure effective implementation of the FOG Control Program. (xiii). A regularly maintained list of current commercial establishment FOG generators including a description of their FOG generating processes and estimated average quantity of FOG generated daily. (xiv). Establishment of performance indicators to be used by Miami-Dade to measure the effectiveness of the FOG Control Program. -33- Page 538 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 37 of 101 (xv). A schedule to review, evaluate and revise the FOG Control Program on at least an annual basis. Any revisions to the FOG Control Program shall be submitted to EPA and FDEP in accordance with Paragraph 15 of this Consent Decree. Within one hundred-eighty (180) Days of receipt of EPA's approval of the new FOG Control Program, Miami-Dade shall enact the ordinance. Subject to enactment,Miami-Dade shall immediately undertake the implementation of the new FOG Control Program,which shall be incorporated into, and become enforceable under,this Consent Decree. (b). Sewer Overflow Response Plan("SORP"). Pursuant to Paragraph 15 of the First Partial Consent Decree and Paragraph 24 of the Second and Final Consent Decree, Miami-Dade developed and implemented a program for identifying and reporting SSOs. Miami- Dade shall continue to implement this program as an enforceable obligation under this Consent Decree until it implements a SORP approved by EPA and FDEP as set forth below. Within nineteen (19)Months after the Effective Date of this Consent Decree, Miami-Dade shall submit to EPA and FDEP for review and comment a SORP that will establish timely and effective methods and means of responding to, cleaning up, and/or minimizing the impact of SSOs; timely reporting of the location,volume, cause, impact, and other pertinent SSO information to the appropriate regulatory agencies; and timely and effective notification of SSOs to potentially impacted public. At minimum,the SORP shall include and provide for the following: (i). Within twenty-four(24)hours of the time Miami-Dade first becomes aware of a SSO to waters of the United States or the State, of a SSO greater than or equal to one thousand (1,000)gallons, or of a SSO that will endanger public health or the environment, Miami-Dade shall provide in an oral report to FDEP the location of the SSO by street address or -34- Page 539 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 38 of 101 any other appropriate method (i.e., latitude-longitude). The oral report shall be given to FDEP through the State Warning Point Hotline. (ii). Within five(5) days of the time Miami-Dade first becomes aware of a SSO to waters of the United States or the State, of a SSO greater than or equal to one thousand (1,000)gallons, or of a SSO that will endanger public health or the environment, Miami-Dade shall also provide a written report to FDEP for the SSO. Miami-Dade shall maintain a copy of any written reports prepared pursuant to this Paragraph for a period of not less than five (5)years from the date of the SSO. The written report shall contain the following: (A). The location of the SSO by street address, or any other appropriate method(i.e., latitude-longitude); (B). The estimated date and time when the SSO began and stopped, or if it is still an active SSO,the anticipated time to stop the SSO; (C). The steps taken to respond to the SSO; (D). The name of the receiving water, if applicable; (E). An estimate of the volume(in gallons) of sewage spilled; (F). A description of the WCTS component from which the SSO was released (such as manhole, crack in pipe, Pump Station wet well or constructed overflow pipe); (G). Subject to available information, an estimate of the SSO's impact on public health and to water quality in the receiving water body; (H). The cause or suspected cause of the SSO; (I). The date of the last SSO at the same point; -35- Page 540 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 39 of 101 (J). The steps taken or to be taken to reduce,prevent, or eliminate, reoccurrence of the SSO; (K). A list of all notifications to the public and other agencies or departments; and (L). The steps taken or to be taken to clean up any surfaces that have been in contact and/or contaminated by the SSO. (iii). Miami-Dade shall maintain for all SSOs for a period of not less than five(5)years from the date of the SSO all records documenting the steps that have been and will be taken to prevent the SSO from recurring, including work order records associated with investigation and repair activities related to the SSO. Miami-Dade shall also maintain for a period of not less than five(5)years from the date of the SSO a list and description of complaints from customers or others regarding the SSO. (iv). The SORP shall provide procedures for responding to all SSOs to minimize the environmental impact and potential human health risk of SSOs. At a minimum, such response procedures shall include: (A). A detailed description of the actions Miami-Dade will undertake to immediately provide notice to the public(through the local news media or other means including signs or barricades to restrict access) of a SSO; (B). A detailed description of the actions Miami-Dade will undertake to provide notice to appropriate federal, state or local agencies/authorities; (C). A detailed plan(including the development of response standard operating procedures)to minimize the volume of untreated wastewater transmitted to -36- Page 541 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 40 of 101 the portion of the WCTS impacted by the events precipitating the SSO to minimize overflow volumes; (D). A particular description of Miami-Dade's response to Building Backups, including the timeframe for responses and the measures to be taken to clean up Building Backups found to be caused by conditions in Miami-Dade's Sewer System, including procedures necessary to disinfect and/or remove items potentially contaminated by Building Backups such as wet vacuuming or other removal of spillage, wiping floors and walls with cleaning solution and disinfectant, flushing out and disinfecting plumbing fixtures, carpet cleaning and/or replacement and other appropriate measures to disinfect and/or remove items potentially contaminated by Building Backups; and a description of Miami-Dade's follow-up process to insure adequacy of cleanup. (v). A detailed plan of the resources to be used to correct or repair the condition causing or contributing to the SSO. (vi). A detailed plan to ensure the preparedness, including response training of Miami-Dade employees and personnel of other affected agencies, necessary for the effective implementation of the SORP in the event of a S SO and establishing procedures and providing adequate training to response personnel for estimating SSO volumes. (vii). A list of those SSO locations within the area of the WCTS served by each Pump Station that have been recorded as overflowing more than once within the previous twelve (12)month period and/or those locations at which a SSO is likely to occur first in the event of a Pump Station failure. -37- , Page 542 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 41 of 101 (viii). Pump Station emergency bypass/pump-around strategies, and procedures. (c). Information Management System("IMS") Program. Within twenty-four (24) Months after the Effective Date of this Consent Decree, Miami-Dade shall submit to EPA and FDEP for review and comment an IMS Program, as more particularly described below. At a minimum,the IMS Program shall include the following: (i). A management IMS component to provide Miami-Dade managers with guidance and instruction to adequately evaluate operations, maintenance, customer service, and Sewer System rehabilitation activities so that overall Sewer System performance can be determined and utility planning can be conducted. This IMS component shall utilize management reports and standard management forms. (ii). An operations IMS component to provide Miami-Dade managers and field supervisors with guidance to adequately track scheduled operational activities and to enhance operational performance. This IMS component shall utilize operating reports and standard operation forms used by field personnel and shall provide for field supervisor review. (iii). A maintenance IMS component to provide Miami-Dade managers and field supervisors with guidance to adequately track scheduled maintenance activities and to enhance maintenance performance. This IMS component shall utilize maintenance reports and standard maintenance forms used by field personnel. The system shall provide for field supervisor review. (iv). A description of what information will be fed into the system,how it will be entered and by what means it will be recorded. -38- Page 543 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 42 of 101 (v). A description of the management reports that will be generated from the input data (i.e.,work reports), including examples and periodicity for review of such reports. (vi). A description of the work reports that will be prepared and submitted, including examples and periodicity for review of such reports. (vii). Standard forms that will be used by both field personnel and management for the Program,where applicable. (viii). A detailed description of how the records will be maintained. (ix). If computer software will be utilized, a description of the software to be used with cited references for software training and procedures for utilizing the software. (x). Implementation of a Geographic Information Systems ("GIS")map of its entire WCTS on or before forty-two (42)Months after the Effective Date of this Consent Decree. Specifically, Miami-Dade shall implement improvements to its current GIS as follows: (A). An updated GIS database to include all as-builts and Active As-built Supplemental Information System ("AAS IS") forms, including new and corrected asset attribute data; (B). Streamlining of the GIS data entry process for new assets, including electronic as-built data and necessary standards so that all new assets are added to the GIS system within ninety(90)calendar days of their activation in the field. Included shall be the development of a system to interface with the Miami-Dade WCTS hydraulic computer model so that the information can be efficiently exported to the WCTS hydraulic computer model; (C). Simplification of the AAS IS process to facilitate wider usage; -39- Page 544 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 43 of 101 (D). Development of a"flagging process" for damage investigators to note GIS inaccuracies; (E). Provision for additional GIS training and refresher training; (F). Use of Dade On-Line Facilities Information Network version II ("DOLFIN II")to facilitate more widespread access to GIS resources to remote staff; and (G). Determination via suitable as-built drawings, or GPS or traditional surveying field measurements, elevations of all manhole rim elevations and sewer inverts at connections to manholes and Pump Stations and their inclusion into GIS. (xi). Development and implementation of performance indicators to provide Miami-Dade managers with guidance to adequately evaluate data collected in the IMS for use in determining the condition of the Sewer System and an evaluation of Miami-Dade's CMOM programs. Performance indicators shall include, without limitation, the linear footage of Gravity Sewer Line and Force Main inspections,the linear footage of Gravity Sewers cleaned, the number of manholes inspected,the number of manholes cleaned/maintained,the number of inverted siphons inspected,the number of inverted siphons cleaned/maintained,the number of SSOs per mile of Gravity Sewer,the number of SSOs per mile of Force Main, the number of SSOs per Pump Station,per capita wastewater flow,NPDES Permit effluent compliance and such other performance indicators as Miami-Dade may suggest and EPA approve; and (xii). Maintenance activity tracked by type (corrective,preventative, and emergency). (d). Sewer System Asset Management Program. For purposes of this Consent Decree,the term"Asset Management Program" shall mean a management program that -40- Page 545 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 44 of 101 maintains a desired level of service for Miami-Dade's Sewer System considering life cycle cost to ensure compliance with regulatory requirements and this Consent Decree. Within twenty-two (22)Months after the Effective Date of the Consent Decree, Miami-Dade shall submit to EPA and FDEP for review and comment an Asset Management Program, including a schedule for full implementation of the program. The Asset Management Program shall include the following components: (i). A current condition assessment of all Sewer System components, including,but not limited to, Pump Station components, Gravity Sewer Lines,manholes, siphons, aerial crossings,Force Mains, etc. Miami-Dade may use data gathered from its latest round of Infiltration/Exfiltration/Inflow sewer assessments as a baseline conditional assessment to meet this component. (ii). A statement of the level of service Miami-Dade intends to provide the customers it serves considering life cycle cost to ensure compliance with regulatory requirements and this Consent Decree. (iii). The identification of critical assets within the Sewer System that are absolutely necessary to have in service to maintain the developed level of service. (iv). The identification of minimum life cycle costs for each critical asset. (v). A long-term funding plan to fully implement and be able to pay for all identified life cycle costs for each critical asset. The long-term funding plan shall include all potential sources of revenue and the likelihood of securing funding from each source. (e). Gravity Sewer System Operations and Maintenance Program. Within fourteen (14)Months after the Effective Date of this Consent Decree, Miami-Dade shall submit -41- Page 546 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 45 of 101 to EPA and FDEP for review and comment, a Gravity Sewer System Operations and Maintenance Program to address S SOs,particularly those caused by FOG,roots and/or debris obstructions. At a minimum,the Gravity Sewer System Operations and Maintenance Program shall include the following: (i). Written preventative operations and maintenance schedules and procedures which shall be scheduled appropriately and shall include, but not be limited to, written procedures for the following: (A). Inspection and maintenance of all Gravity Sewers, manholes and inverted siphons; (B). Identifying and documenting Gravity Sewer, manhole and inverted siphon conditions, including grease,roots, and/or debris accumulation; (C). Identifying maintenance needs; and (D). Scheduling preventative maintenance work/cleaning which Miami-Dade may schedule in connection with the Force Main Assessment Program and/or Force Main Rehabilitation/Replacement Program as described in Subparagraphs 19(g)(iii) and (iv) below. (ii). An engineering evaluation of potential sulfide and corrosion control options and a summary report of findings, including a recommendation of the preferred sulfide and corrosion control method(s);provided,however, that such corrosion control options and methods shall not apply to components made of plastic or other similar materials. • -42- Page 547 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 46 of 101 (iii). Prioritization for evaluating the Gravity Sewers based upon the size of the pipe (e.g., starting with the larger pipes and work back to smaller pipes), location of SSOs, community input or other criteria it finds appropriate. (iv). Inspection of Gravity Sewers,manholes, and inverted siphon easements, including inspection of creek crossings, canal crossings, stream bank encroachment toward Gravity Sewers,manholes and inverted siphons, and easement accessibility(including the need to control vegetative growth or encroachment of man-made structures or activities that could threaten the integrity of the affected Gravity Sewer, manhole, or inverted siphon). Inspections shall include written reports, and where appropriate,representative photographs or videos of appurtenances being inspected(Gravity Sewers,manholes, inverted siphons, creek crossings, canal crossings, etc.). Inspectors shall promptly report any observed SSOs to their area supervisors and shall record any evidence of SSOs which may have occurred since the last inspection. Any observed SSO shall be promptly reported in accordance with the SORP. (v). A schedule for the maintenance of easements. (vi). A staffing and funding plan sufficient in structure, skills, numbers and funding-to allow completions of the operation and maintenance activities required by this Subparagraph 19(e). (vii). Data attributes for Miami-Dade's mapping program allowing program data to be compared in Miami-Dade's IMS against other pertinent data such as the occurrence of SSOs, including repeat SSO locations and permit violations. (viii). An inventory management system that includes: (A). A list of critical equipment and critical spare parts; -43- Page 548 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 47 of 101 (B). A list of where critical spare parts and critical equipment may be secured to allow repairs in a reasonable amount of time for those spare parts and critical equipment that are not stored by Miami-Dade, including spare pipe having a diameter of 48 inches or greater;the list shall also set forth an inventory of spare parts and critical equipment stored by Miami-Dade, as applicable; and (C). Written procedures for updating the critical spare parts and equipment inventories in the IMS. (ix). Reports which list equipment problems and the status of work orders generated during the prior Month. (f). Pump Station Operations and Preventative Maintenance Program. Within sixteen(16)Months after the Effective Date of this Consent Decree,Miami-Dade shall submit to EPA and FDEP for review and comment a Pump Station Operations and Preventative Maintenance Program to facilitate proper operation and maintenance activities associated with the Pump Stations within the WCTS. At a minimum,the Pump Station Operations and Preventative Maintenance Program shall include the following: (i). Identification of the means and modes of communication between Pump Stations, field crews, and supervising staff. (ii). Technical specifications of each Pump Station within the WCTS. (iii). A description of each Pump Station monitoring system which shall continuously monitor, report, and transmit information for each Pump Station. -44- Page 549 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 48 of 101 (iv). Written preventative operations and maintenance schedules and procedures which shall be scheduled appropriately and shall include, but not be limited to, written procedures for the following: (A). Periodic service and calibration of instrumentation such as flow meters, liquid level sensors, alarm systems, elapsed time meters, and remote monitoring equipment; (B). Predictive(including non-physical inspections) and/or physical inspection and service for all Pump Stations including, but not limited to: (1) reading,recording and maintaining records of information from the elapsed time meters and pump start counters; (2) observing and documenting wet well conditions, including grease and/or debris accumulation; (3) checking and re-setting, as necessary to improve system performance,wet well pumping points (e.g., floats); (4) checking,recording and maintaining records of system pressure(s); (5) checking SCADA and/or alarm components; (6) checking stand-by power sources; (7) checking motor electrical system, including,but not limited to, line voltage on each leg quarterly, current draw on each leg quarterly, and resistance of windings on each leg quarterly; and (8) identifying maintenance needs. -45- Page 550 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 49 of 101 (v). Written standard emergency/reactive operations and maintenance procedures. Miami-Dade, subject to its discretion, may use portable pumps,portable generators or alternative power sources as it deems appropriate. At a minimum,the standard emergency/reactive Pump Station operating procedures shall include: (A). Criteria used to determine the need for emergency operations and maintenance; (B). Initiation/use of stand-by power(e.g.,portable generators), where applicable; (C). Initiation/use of portable pump (e.g.,bypass/pump-around operations), where applicable. (D). Evaluation of the need for additional equipment for emergency/reactive operations, including,but not limited to, additional portable generators and/or additional portable pumps (for pump-around operations); (E). Evaluation of the need for on-site standby power(e.g., on-site generator and/or second electrical feed from the power grid) for each Pump Station should Miami-Dade choose, subject to its discretion,not to have a portable pump available for the Pump Station; and (F). Establishing standard forms,reporting procedures and performance measures for emergency/reactive operations and maintenance. (vi). An inventory management system that includes: (A). A list of critical equipment and critical spare parts; -46- Page 551 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 50 of 101 (B). A list of where critical spare parts and critical equipment may be secured to allow repairs in a reasonable amount of time for those spare parts and critical equipment that are not stored by Miami-Dade; the list shall also set forth an inventory of spare parts and critical equipment stored by.Miami-Dade, as applicable; and (C). Written procedures for updating the critical spare parts and equipment inventories in the IMS. (vii). Reports which list equipment problems and the status of work orders generated during the prior Month. (viii). A staffing and funding plan sufficient in structure, skills,numbers and funding to allow completion of the operations and maintenance activities required by this Subparagraph 19(f). (g). Force Main Operations, Preventative Maintenance and Assessment/Rehabilitation Program. (i). Within twenty(20)Months after the Effective Date of this Consent Decree, Miami-Dade shall submit to EPA and FDEP for review and comment a Force Main Operations, Preventative Maintenance and Assessment/Rehabilitation Program to facilitate proper operations and maintenance activities associated with Force Mains within the WCTS. At a minimum, the Force Main Operations,Preventative Maintenance and Assessment/Rehabilitation Program shall include the following: (A). The assessment of Force Mains, including an evaluation of potential sulfide and corrosion control options, and a summary report of findings, including a recommendation of the preferred sulfide and corrosion control method(s);provided, however, -47- Page 552 of 1707 i Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 51 of 101 1 that such corrosion control options and methods shall not apply to components made of plastic or other similar materials; (B). The Inspection of Force Main easements, including inspection of canal crossings, stream bank encroachment toward Force Mains, and easement accessibility to identify whether further action would be necessary for Miami-Dade to be able to have access should a problem arise. Inspections shall include written reports, and where appropriate,representative photographs or videos of appurtenances being inspected(Force Mains, creek crossings, canal crossings, etc.). Inspectors shall promptly report any observed SSOs to their area supervisors and shall record any evidence of SSOs which may have occurred since the last inspection. Any observed SSO shall be promptly reported in accordance with the SORP. (C). A schedule for the maintenance of easements. (D). A staffing and funding plan sufficient in structure, skills, numbers and funding to allow completion of the activities required by this Subparagraph 19(g). (E). An inventory management system that includes: (1). A list of critical equipment and critical spare parts; (2). A list of where critical spare parts and critical equipment may be secured to allow repairs in a reasonable amount of time for those spare parts and critical equipment that are not stored by Miami-Dade(e.g., spare pipe havinga diameter of 48 inches or greater);the list shall also set forth an inventory of spare parts and critical equipment stored by Miami-Dade, as applicable; and -48- Page 553 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 52 of 101 (3). Written procedures for updating the'critical spare parts and equipment inventories in the TMS. (F). Reports which list equipment problems and the status of work orders generated during the prior Month. (ii). Force Main Criticality Assessment and Prioritization Report. Within nine (9) Months after EPA's approval of the Force Main Operations,Preventative Maintenance and Assessment/Rehabilitation Program, Miami-Dade shall submit to EPA and FDEP for review and comment a Force Main Criticality Assessment and Prioritization Report that shall set forth the results of Miami-Dade's criticality assessment of the structural integrity of its Force Mains and the risk of Force Main critical failure. Miami-Dade shall base its criticality assessment of a Force Main on any previous assessments or investigations regarding the structural integrity of the Force Main,the size of the,Force Main (e.g., gallons per day capacity and/or diameter), the age of the Force Main,the pipe material of the Force Main, the length of the Force Main,the availability(including distance) of the nearest WCTS component which could;handle flows from that Force Main in the event of failure,the operating pressure of the Force Main during peak flow events,the availability of new pipe in case of failure (i.e. for large diameter Force Mains). Miami-Dade shall use this criticality assessment to prioritize its Force Mains for further assessment and/or rehabilitation/replacement pursuant to the Force Main Asses'sment Program and the Force Main Rehabilitation/Replacement Program set forth below. The Force Main Criticality Assessment and Prioritization Report shall include the results of Miami-Dade's Force Main prioritization for further assessment and/or rehabilitation/replacement of its Force Mains, including a prioritized schedule for implementation of the Force Main Assessment Program -49- Page 554 of 1707 i Case 1:12-cv-24400-FAM Document 25-1n ered on FLSD Docket 06/06/2013 Page 53 of provided,however, that all Force Mains shall be assessed pursuant to the Force Main Assessment Program on or before sixty(60)Months after approval by the EPA of the Force Main Criticality Assessment and Prioritization Report. (iii). Force Main Assessment Program. Miami-Dade shall implement the Force Main Assessment Program in accordance with the schedule set forth in the Force Main Criticality Assessment and Prioritization Report. At a minimum, the Force Main Assessment Program shall include the following: (A). Standard procedures and schedules for continual above- ; ground assessment of the route(s) of each Force Main in the WCTS. This co Iponent shall include standard forms for the visual assessment of Force Main routes and ground level conditions that may show structural issues with the Force Main below ground. (B). Standard procedures and schedules for continual assessment of the route(s) of each Force Main in the WCTS where it crosses a surface water body and/or drainage way. This component shall include standard forms for the visual assessment of Force Main routes and above ground conditions that may show structural or leakage tissues with the Force Main where it crosses a surface water body and/or drainage way. (C). Standard procedures and schedules for inspecting and identifying Force Mains that are either corroded or at risk of corrosion. This Component shall include a system for prioritizing repair of corrosion defects, corrosion identification forms, and (D). Standard procedures and schedules for monitoring all existing cathodic protection measures on existing Force Mains, as well as detailed catIodic protection requirements for any newly installed Force Mains. -50- Page 555 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 54 of 101 (E). Standard procedures and schedules for implementing acoustic monitoring of the Force Mains. The acoustic monitoring component shall include leak detection, acoustic monitoring(i.e., monitoring for wire breaks in pre-stressed concrete cylinder Pipe), and Sonar or Ultrasonic monitoring for pipe defect analysis (e.g.,pipe wall deflections, corrosion, pits,voids, cracks, and debris). Any resulting internal wall thickness measuremients shall be used to establish a list of potential corrosion problems and rehabilitation of the Force Main to prevent line breaks and/or ability to operate under pressures experienced during peak flow events. (F). Criteria for use of ground-penetrating radarto determine leaks, Force Main bedding conditions and/or Force Main bedding voids. (G). Assessment of the feasibility of installations of parallel Force Mains in the case of emergency repairs of those Force Mains determined by Miami-Dade to be highly critical. (iv). Force Main Rehabilitation/Replacement Program. Within twenty- four(24)Months after the Effective Date of this Consent Decree,Miami-Dade shall submit to EPA and FDEP for review and approval a Force Main Rehabilitation/Replacement Program. At a minimum, the Force Main Rehabilitation/Replacement Program shall include the following: (A). Standard procedures for repairing each Force Main in the WCTS that is deemed to be in need of repair pursuant to the Force Main Criticality Assessment and Prioritization Report and/or Force Main Assessment Program. Repair technologies shall include, but not be limited to, open cut replacement of section(s) of pipe, spot repairs using -51- Page 556 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 55 of 101 cured-in-place pipe("CIPP"), mechanical sleeves or repair clamps, or joint repairs using internal sleeves or external devices. (B). Standard procedures for rehabilitating each;Force Main in the WCTS that is deemed to be in need of rehabilitation pursuant to the Force Main Criticality Assessment and Prioritization Report and/or Force Main Assessment Program. Rehabilitation technologies shall include,but not be limited to, spray-on linings, close fit linings, CIPP, and woven hose linings(including adhesive-backed linings, non-adhesive backed linings and glass- reinforced thermoplastic linings). (C). Standard procedures for replacing each Force Main in the WCTS that is deemed to be in need of replacement pursuant to the Force Main Criticality Assessment and Prioritization Report and/or Force Main Assessment Program: Replacement technologies shall include,but not be limited to, open cut replacement of pipe„sliplining,pipe bursting, directional drilling, and microtunneling/pipe jacking. Miami-Dade shall implement the Force Main Rehabilitation/Replacement Program in accordance with the prioritization of the Force Main Criticality Assessment and Prioritization Report and based on the results and finding of its implementation of the Force;Main Assessment Program;provided,however,that all Force Mains shall be repaired,rehabilitated or replaced pursuant to the Force Main Assessment Program on or before sixty(60)Months after completion of the condition assessment. Within three(3)Months after completion of all work pursuant to the Force Main Rehabilitation/Replacement Program,Miami-Dade shall submit to EPA and FDEP for review and comment a Force Main Rehabilitation/Replacement Program Final Report summarizing the implementation of the Program. -52- Page 557 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 56 of 101 (h). WWTP Operations and Maintenance Program. Within seventeen (17) Months of the Effective Date of this Consent Decree,Miami-Dade shall submit to EPA and FDEP for review and approval a WWTP Operations and Maintenance Program to facilitate proper operation,maintenance and equipment replacement activities associated with the WWTPs. At a minimum, the WWTP Operations and Maintenance Program shall include the following: (i). A prioritization of WWTP equipment as critical, semi-critical or non- critical based upon an evaluation of the impacts of the loss of use or failure of each piece of WWTP equipment. Such prioritization shall include the following WWTP equipment, as it applies specifically to each Miami-Dade operated WWTP: (A). In-plant raw sewage conveyance, including,but not limited to,raw sewage transmission pipes, flow meters and valves; (B). Pretreatment screening, including, but not limited to, bar screen equipment, perforated plate screen equipment, concrete channels and structures, and screening collection, compaction and conveyance equipment; (C). Influent grit chamber equipment, including but not limited to, aeration equipment and physical grit removal equipment(e.g., chains and pins,gear boxes, motors, conveyors, etc.); (D). Primary clarifiers, including,but not limited to, concrete tank and structures, scum skimmer equipment, sludge collection mechanism and equipment, covers, ventilation systems,and primary sludge pumping systems; -53- Page 558 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 57 of 101 (E). Aeration/oxygenation tank equipment, including but not limited to, motors, aeration blades, effluent trough screens, effluent trough air diffusion equipment and oxygen generation equipment; (F). Final settling tank equipment, including, but not limited to, scum skimmer equipment, sludge collection mechanism and equipment, covers,ventilation systems, effluent weirs, and concrete tank and structures. (G). Return activated sludge ("RAS") equipment, including but not limited to,pump control equipment, RAS pumps and physical equipment (e.g., air conditioning); (H). Sludge thickener and digester equipment, including but not limited to, sludge digester tanks/covers, gas and sludge mixers, heat exchangers and internal pumps; (I). Sludge dewatering, including,but not limited to, centrifuge equipment,polymer systems, centrate handling and on-site sludge hauling and transferring vehicles. (J). Effluent disinfection, including,but not limited to, chlorine gas equipment,bulk hypochlorite solution storage, on-site hypochlorite generation equipment, and chlorine solution dosage and distribution equipment; (K). Chlorine contact chamber, including,but not limited to, concrete tank, diffuser and structures; -54- Page 559 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 58 of 101 (L). Effluent disposal, including,but not limited to, effluent pumping equipment, effluent wet well, effluent surge tank, effluent outfalls and diffusers, effluent deep injection wells, industrial and public reuse treatment and distribution equipment; (M). Yard piping, including,but not limited to,pipes, flow metering and valves; (N). Odor control systems, including,but not limited to, air scrubbing towers,blower equipment and duct work, and chemical storage and metering equipment; (0). Tertiary treatment, including,but not limited to, screw pump equipment, flocculation tanks,polymer system, and deep bed sand filter equipment; (P). Biosolids handling, including, but not limited to, sludge drying beds, composting equipment, and biosolids handling heavy equipment; (Q). Septage, fats, oils, and grease receiving facility, including, but not limited to, septic truck receiving station equipment, septage screening equipment, and solids/liquid/scum separation equipment; (R). Laboratory,training and administration facilities; (S). Ferric salts dosing facilities; and (T). WWTP electrical equipment, including,but not limited to, motor control centers,remote telemetry units, metering, SCADA equipment, electrical conduit, electrical breakers, on-site emergency generators, biogas conveyance, biogas condition systems, methane storage spheres, and combined heat and power co-generation equipment. -55- Page 560 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 59 of 101 (ii). A schedule for preventative maintenance activities that is as expeditious as possible. Miami-Dade shall develop a schedule for preventative maintenance activities such as grit chamber equipment maintenance, aeration tank equipment maintenance, final settling tank equipment maintenance, sludge thickener and digester equipment maintenance, electrical equipment maintenance (e.g., on-site generators and electrical co- generation equipment),pump maintenance (e.g.,preventative lubrication and packing maintenance),mechanical maintenance, physical maintenance (e.g. building repairs, equipment painting, and grounds upkeep) and other maintenance activities as needed at Miami-Dade's WWTPs that is as expeditious as possible. Such schedule shall include,but not be limited to, manufacturers' maintenance recommendations. (iii). A maintenance information management system that shall have the capability of scheduling and tracking both preventative and reactive maintenance activities. (iv). An inventory of spare parts. Miami-Dade shall identify which critical spare parts are maintained in inventory and provide a schedule to purchase critical spare parts that are not in inventory. (v). A spare parts inventory control system. Miami-Dade shall also develop, either as part of the maintenance information management system, or as a separate data management system, an inventory control system that shall have the capability of tracking spare parts use and inventory, as well as generating inventory replenishment needs reports. (vi). A staffing and funding plan sufficient in structure, skills,numbers and funding to allow completion of the activities required by this Subparagraph 19(h). -56- Page 561 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 60 of 101 (vii). An active control program for hauled wasteloads to the WWTP that includes, but is not limited to: hauled wasteload receiving station(s)that allow the control of flow and loadings from a wasteload into the WWTP; communication, data collection, documentation, and other standard operating procedures to effectively determine,prior to acceptance of a wasteload into the WWTP,the sources of an individual domestic or non- domestic wasteload,the pollutant characteristics of an individual wasteload, and the compliance of an individual wasteload with applicable federal and local standards and requirements. Miami- Dade shall submit an implementation schedule for the program, and shall develop the program using the considerations and recommendations in the EPA's Handbook: Guidance Manual for Control of Hauled Wastes,EPA-833-B-98-003 (September 1999)to the extent applicable and appropriate. (i). Specific Capital Improvement Projects. Based on previous investigations, Miami-Dade has identified certain rehabilitation projects that are intended to address conditions currently causing SSOs or contributing to NPDES permit violations. These specific capital improvement projects are identified and described in the Work Plan set forth in Appendix D, attached hereto and incorporated herein. Miami-Dade shall complete each of these capital improvement projects in accordance with the schedules set forth in Appendix D. The Parties acknowledge that Miami-Dade's implementation of the Ocean Outfall Legislation may impact the scope and scheduling of certain capital improvement projects identified in Appendix D of this Consent Decree. Notwithstanding any other right Miami-Dade may have to seek a modification to this Consent Decree,the Parties therefore acknowledge that Miami-Dade may request of EPA and FDEP modifications to the scope and scheduling of such capital -57- Page 562 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 61 of 101 improvement projects as set forth in Appendix D. Any such request shall include a demonstration by Miami-Dade of how implementation of the Ocean Outfall Legislation impacts the scope or scheduling of a capital improvement project; why the scope or scheduling of an affected capital improvement project should be modified because of implementation of the Ocean Outfall Legislation; whether any such requested modification is necessary in order for Miami-Dade to comply with the Ocean Outfall Legislation; and how the proposed modification would affect Miami-Dade's compliance with the CWA,the regulations promulgated thereunder, Fla. Stat. Chapter 403, and the applicable Fla. Admin. Code Rules promulgated thereto, as well as the NPDES Permits. Except as provided below, any modifications agreed upon in writing by the United States, FDEP, and Miami-Dade to this list of projects or schedules set forth in Appendix D shall constitute a non-material change to this Consent Decree as set forth in Section XX (Modification)below. Notwithstanding the foregoing, any deletion of an entire project set forth in bold and delineated by an ID number with one decimal point(e.g. 1.1) in Appendix D agreed upon in writing by the United States, FDEP and Miami-Dade shall constitute a material change to this Consent Decree as set forth in Section XX (Modification)below. Additionally, Miami-Dade shall complete all the capital improvement projects set forth in Appendix D on or before fifteen (15)years from the Date of Lodging, and any modification agreed upon in writing by the United States,FDEP, and Miami-Dade to this final compliance date shall be considered a material change to this Consent Decree as set forth in Section XX(Modification)below. (j). Financial Analysis Program. Within twelve (12)Months after the Effective Date of this Consent Decree,Miami-Dade shall submit to EPA and FDEP for review and approval a Financial Analysis Program to ensure that it can effectively establish and track -58- • Page 563 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 62 of 101 the sufficiency of funds for operations and maintenance, capital projects financing, and debt service coverage associated with the Sewer System, including, without limitation, the continued implementation of the Work pursuant to this Consent Decree. The Financial Analysis Program shall be consistent with the following criteria: (i). A program that regularly analyzes and projects future utility management, operations, and maintenance costs needed to effectively manage, operate, and maintain the Sewer System, including,without limitation,the continued implementation of the CMOM Programs required pursuant to Paragraphs 18 and 19 of this Consent Decree. The cost analyses should include, at a minimum: capital infrastructure improvements; labor needs (including a staffing plan); and equipment and materials needs. (ii). A program that analyzes,projects,plans, and finances capital improvement needs established through engineering studies; Sewer System condition assessments; historical Sewer System management, operations, and maintenance cost data; and sound sewer infrastructure asset management programs, including,without limitation, capital improvement needs established and required pursuant to Paragraphs 18 and 19 of this Consent Decree. Capital improvement financing should be planned using a five(5)year planning horizon with annual updates. (iii). A program that establishes the annual utility budget and customer rates periodically. The program should assure that the budget and funding provided by customer rates will meet the cost and financing needs for the management, operation, and maintenance of the Sewer System and the capital improvement needs as identified pursuant to the procedures set forth in Subparagraphs 19(j)(i) and (ii)above. -59- Page 564 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 63 of 101 (iv). A program that directly tracks and reports operation and maintenance costs by the type of activity (corrective,preventative, and emergency) and capital improvement costs. (v). A program that tracks and reports any transfer or use of funds obtained by Miami-Dade from the collection of sewer rates for any purpose not related to the management, operation, or maintenance of the Sewer System or to any capital improvement needs of the Sewer System. Such transfers or uses of funds to be tracked and reported in this program do not apply to funds internally used within the Miami-Dade Water and Sewer Department and funds transferred or used to administratively reimburse other departments or agencies within Miami-Dade for services rendered to the Miami-Dade Water and Sewer Department for purposes related to the management, operation, or maintenance of the Sewer System or to any capital improvement needs of the Sewer System. The amount, recipient and date of any such use or transfer of funds to be tracked and reported in this program also shall be included in the semi-annual report as provided in Paragraph 33 of this Consent Decree. Miami- Dade shall also provide thirty(30)days advance written notice to the United States and FDEP of Miami-Dade's intent to transfer or use funds required to be tracked and reported in this program. VII. CIVIL PENALTY 20. Within thirty (30) Days after the Date of Entry of this Consent Decree, Miami- Dade shall pay the sum of$978,100 as a civil penalty in accordance with the provisions of Paragraphs 21 and 22. 21. Miami-Dade shall pay to the United States $511,800 of the civil penalty due by FedWire Electronic Funds Transfer("EFT")to the U.S. Department of Justice in accordance -60- Page 565 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 64 of 101 with written instructions to be provided to Miami-Dade, following the Date of Entry of this Consent Decree,by the Financial Litigation Unit of the U.S. Attorney's Office for the Southern District of Florida, 99 N.E. 4th Street, Miami,Fl. 33132, (305) 961-9001. At the time of payment,Miami-Dade shall send a copy of the EFT authorization form and the EFT transaction record, together with a transmittal letter, which shall state that the payment is for the civil penalty owed pursuant to the Consent Decree in United States et al. v. Miami-Dade County, and shall reference the civil action number and DOJ case number 90-5-1-1-4022/1, to the United States in accordance with Section XVII of this Consent Decree (Notices);by email to acctsreceivable.CINWD@epa.gov; and by mail to: EPA Cincinnati Finance Office 26 Martin Luther King Drive Cincinnati, Ohio 45268 In the event that full cash payment to the United States is not made within thirty(30)Days of the Date of Entry of this Consent Decree,Miami-Dade shall pay to the United States interest on the balance due from the original due date to the date of payment, at the rate calculated pursuant to 28 U.S.C. § 1961. 22. Miami-Dade shall pay to FDEP $466,300 of the civil penalty due by check payable to the"Florida Department of Environmental Protection." The check shall reference the case name and include a notation to the "Ecosystem Restoration Trust Fund" and shall be sent to: Florida Department of Environmental Protection Southeast District Attn: Compliance/Enforcement Section 400 N. Congress Ave. West Palm Beach, FL 33401 -61- Page 566 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 65 of 101 In the event that full cash payment to FDEP is not made within thirty (30)Days of the Date of Entry of this Consent Decree, Miami-Dade shall pay to FDEP interest on the balance due from the original due date to the date of payment, at the rate calculated pursuant to 28 U.S.C. § 1961. VIII. SUPPLEMENTAL ENVIRONMENTAL PROJECT 23. Miami-Dade shall satisfactorily implement and complete a Supplemental Environmental Project("SEP") in accordance with this Section VIII (Supplemental Environmental Project) and Appendix E of this Consent Decree. The SEP shall be completed in accordance with the schedule set forth in Appendix E. 24. The SEP shall include the installation of approximately seven thousand six hundred and sixty(7,660)linear feet-of Gravity Sewers within a corridor designated by the Miami-Dade Board of County Commissioners as the"Miami-Dade Green Technology Corridor,"which will facilitate the connection to the Sewer System of approximately seventy four(74)business entities currently using septic tanks. Miami-Dade may use contractors or consultants in planning and implementing the SEP. 25. With regard to the SEP, Miami-Dade certifies the truth and accuracy of each of the following: (a). That all cost information provided to EPA in connection with EPA's approval of the SEP is complete and accurate and that Miami-Dade in good faith estimates that the cost to implement the SEP is $2,047,200. (b). That, as of the date of executing this Consent Decree,Miami-Dade is not required to perform or develop the SEP by any federal, state, or local law or regulation and is not -62- Page 567 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 66 of 101 required to perform or develop the SEP by agreement,grant, or as injunctive relief awarded in any other action in any forum. (c). That Miami-Dade is not a party to any Open Federal Financial Assistance Transaction that is funding or could be used to fund the same activity as the SEP, and that there is no such open federal financial transaction that is funding or could be used to fund the same activity as the SEP, nor has the same activity been described in an unsuccessful federal financial assistant transaction proposal submitted to EPA within two (2)years of the date of Miami- Dade's execution of this Consent Decree(unless the project was barred from funding as statutorily ineligible). For purposes of this certification,the term "Open Federal Financial Assistance Transaction"refers to a grant, cooperative agreement, loan, federally-guaranteed loan guarantee or other mechanism for providing federal financial assistance whose performance period has not yet expired. (d). That the SEP is not a project that Miami-Dade was planning or intending to construct, perform, or implement other than in settlement of the claims resolved in this Consent Decree. (e). That Miami-Dade has not received and will not receive credit for the SEP in any other enforcement action. (f). That Miami-Dade will not receive any reimbursement for any portion of the SEP from any other person. 26. SEP Completion Report. Within thirty(30)Days after the date set for completion of the SEP,Miami-Dade shall submit a SEP Completion Report to the EPA and FDEP for -63- Page 568 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 67 of 101 review and comment. The SEP Completion Report shall contain all of the following information: (a). A detailed description of the SEP as implemented. (b). A description of any problems encountered in completing the SEP and the solutions thereto. (c). An itemized list of all eligible SEP costs expended. (d). Certification that the SEP has been fully implemented pursuant to the provisions of this Consent Decree. (e). A description of the environmental and public health benefits resulting from implementation of the SEP (with a quantification of the benefits and pollutant reductions, if feasible). 27. EPA may, in its sole discretion,require information in addition to that described in the preceding Paragraph, in order to evaluate Miami-Dade's SEP Completion Report. 28. After receiving the SEP Completion Report, EPA shall notify Miami-Dade whether or not Miami-Dade has satisfactorily completed the SEP. If Miami-Dade has not completed the SEP in accordance with this Consent Decree, stipulated penalties may be assessed under Section X of this Consent Decree(Stipulated Penalties). 29. Disputes concerning the satisfactory performance of the SEP and the amount of eligible SEP costs may be resolved under Section XII of this Consent Decree(Dispute Resolution). 30. Each submission required under this Section shall be signed by an official with knowledge of the SEP and shall bear the certification language set forth in Paragraph 16. -64- Page 569 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 68 of 101 31. Any public statement,oral or written, in print, film, or other media,made by Miami-Dade making reference to the SEP under this Consent Decree shall include the following language: "This project was undertaken in connection with the settlement of an enforcement action,United States et al. v. Miami-Dade County, taken on behalf of the U.S. Environmental Protection Agency and the Florida Department of Environmental Protection under the Clean Water Act." IX. REPORTING REQUIREMENTS 32. Quarterly Reports. Beginning one(1)Month after the first Calendar Quarter following the Effective Date of this Consent Decree, and one(1) Month after each Calendar Quarter thereafter until termination of the Consent Decree,Miami-Dade shall submit to EPA and FDEP for review and comment a Quarterly Report. Such Quarterly Reports shall include the date,time, location, source, estimated duration, estimated volume, receiving water(if any), and cause of all SSOs occurring in the previous Calendar Quarter. In reporting such data, Miami- Dade shall provide the information in a tabulated electronic format (e.g.,Excel spreadsheet) as it deems appropriate. 33. Semi-Annual Reports. Beginning one(1)Month after the first two (2)Calendar Quarters following the Effective Date of this Consent Decree, and one (1)Month after each subsequent two (2) Calendar Quarters until termination of the Consent Decree,Miami-Dade shall submit to EPA and FDEP for review and comment a Semi-Annual Report. Six(6) years from the Effective Date of this Consent Decree and each subsequent year until termination,the United States, FDEP, and Miami-Dade agree to consider whether to discontinue the Semi- Annual Reports. If the United States, FDEP, and Miami-Dade agree to discontinue the Semi- -65- Page 570 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 69 of 101 Annual Reports, such modification shall be considered a non-material change to this Consent Decree pursuant to Section XX (Modification); and the information required in Subparagraphs 33(a)through(d)below shall then be included in each Annual Report submitted pursuant to Paragraph 34 and shall cover the applicable Calendar Year rather than two (2)Calendar Quarters. Each Semi-Annual Report shall include, at a minimum: (a). A description of projects and activities completed and milestones achieved during the previous two(2) Calendar Quarters pursuant to the requirements of this Consent Decree, in Gantt chart or similar format, including a description of the status of compliance or non-compliance with the requirements of this Consent Decree and, if applicable, the reasons for non-compliance. If any non-compliance cannot be fully explained at the time the report is due, Miami-Dade shall include a statement to that effect in the report. Miami-Dade shall investigate to determine the cause of the non-compliance and then shall submit an amendment to the report, including a full explanation of the cause of the non-compliance, within thirty(30)Days after submission of the report. (b). A summary of significant projects and activities anticipated to be performed, and milestones anticipated to be achieved, in the successive two (2) Calendar Quarters to comply with the requirements of this Consent Decree, in Gantt chart or similar format. (c). The amount,recipient and date of any transfer or use during the previous two(2) Calendar Quarters of funds obtained by Miami-Dade from the collection of sewer rates for any purpose not related to the management, operation or maintenance of the Sewer System or to any capital improvement needs of the Sewer System that is required to be tracked and reported -66- Page 571 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 70 of 101 pursuant to the Financial Analysis Program set forth in Subparagraph 19(j)(v) of this Consent Decree. (d). Any additional information Miami-Dade determines is appropriate to demonstrate that Miami-Dade is implementing the remedial actions required under this Consent Decree in an adequate and timely manner. 34. Annual Reports. Beginning two (2)Months after the first full Calendar Year following the Effective Date of this Consent Decree, and two (2)Months after each subsequent Calendar Year until termination of this Consent Decree, Miami-Dade shall submit to EPA and FDEP for review and comment an Annual Report. Each Annual Report shall cover the most recent applicable Calendar Year and shall include, at a minimum: (a). A narrative summary of progress made, including key accomplishments and significant activities,under the CMOM Programs implemented or modified pursuant to this Consent Decree for the most recent Calendar Year. (b). A trends analysis of the number,volume, average duration, and cause of Miami-Dade's SSOs for the previous two (2) Calendar Years. 35. Except as otherwise provided in the SORP, whenever any violation of this Consent Decree or any other event affecting Miami-Dade's performance under this Consent Decree or its NPDES Permits may pose an immediate threat to the public health or welfare or the environment, Miami-Dade shall notify EPA and FDEP orally or by electronic or facsimile transmission as soon as possible,but no later than twenty-four(24)hours after Miami-Dade first knew of the violation or event. -67- Page 572 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 71 of 101 36. All reports shall be submitted to the persons designated in Section XVII of this Consent Decree(Notices) for EPA and FDEP and shall be certified pursuant to Paragraph 16 of this Consent Decree. The certification requirement in Paragraph 16 does not apply to emergency or similar notifications where compliance would be impractical. In addition, a copy of all reports submitted pursuant to this Section IX(Reporting Requirements) shall also be made available to the public in the PDR. 37. Compliance with this Section does not relieve Miami-Dade of any other reporting obligations required by the CWA, Florida law, implementing regulations, or by any other Federal, state, or local law,regulation,permit, or other requirement, including the NPDES Permits. 38. Notification to EPA or FDEP pursuant to this Section of an anticipated delay shall not by itself excuse the delay or otherwise satisfy the notification requirements set forth in Section XI (Force Majeure). 39. Any information provided pursuant to this Consent Decree may be used by the United States,FDEP, and/or the State in any proceeding to enforce the provisions of this Consent Decree and as otherwise permitted by law. X. STIPULATED PENALTIES 40. After the Date of Entry,Miami-Dade shall be liable for stipulated penalties to the United States and FDEP for violations of this Consent Decree as specified below,unless excused under Section XI (Force Majeure). A violation includes failing to perform any obligation required by the terms of this Consent Decree, including any work plan or schedule approved -68- Page 573 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 72 of 101 under this Consent Decree, according to all applicable requirements of this Consent Decree and within the specified time schedules established by or approved under this Consent Decree. 41. If Miami-Dade fails to pay the civil penalty required to be paid under Section VII of this Consent Decree (Civil Penalty)when due,Miami-Dade shall pay a stipulated penalty of $1,000 per day for each day that the payment is late. 42. The following stipulated penalties shall accrue for each violation identified below: (a). SSOs. (i). For each SSO reaching waters of the United States due to a release of wastewater from the WCTS less than or equal to 10,000 gallons, a stipulated penalty of$500 may be assessed. (ii). For each SSO reaching waters of the United States due to a release of wastewater from the WCTS greater than 10,000 gallons but less than or equal to 250,000 gallons, a stipulated penalty may be assessed as follows: If SSO Occurs Penalty Per SSO Within 2 years of Date of Entry $500 Between 2 years and 5 years from Date of Entry $1,000 More than 5 years from Date of Entry $2,000 (iii). For each SSO reaching waters of the United States due to a release of wastewater from the WCTS greater than 250,000 gallons but less than or equal to 1,000,000 gallons, a stipulated penalty may be assessed as follows: -69- Page 574 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page'73 of 101 If SSO Occurs Penalty Per SSO Within 2 years of Date of Entry $1,000 Between 2 years and 5 years from Date of Entry $2,500 More than 5 years from Date of Entry $5,000 (iv). For each SSO reaching waters of the United States due to a release of wastewater from the WCTS greater than 1,000,000 gallons, a stipulated penalty may be assessed as follows: If SSO Occurs Penalty Per SSO Within 2 years of Date of Entry $2,000 Between 2 years and 5 years from Date of Entry $5,000 More than 5 years from Date of Entry $10,000 (v). For each SSO due to a release of wastewater from the WCTS of 1,000 gallons or more that does not reach waters of the United States, a stipulated penalty may be assessed by FDEP based on the tiered volume and time thresholds provided in Subparagraphs 42(a)(i)through(iv),provided,however, that the amounts that may be assessed shall be half of the amounts listed therein. (vi) Miami-Dade shall not be liable for stipulated penalties under this Paragraph 42 if Miami-Dade demonstrates that the SSO was caused by an Act of God, vandalism,a non-County Contractor, or any act of a third party not working directly or indirectly on behalf of Miami-Dade, and Miami-Dade demonstrates that it has used all reasonable measures to prevent such SSO. -70- Page 575 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 74 of 101 (b). Failure to Timely Submit Deliverable. For each day Miami-Dade fails to Timely submit any Deliverable, a stipulated penalty for each such Deliverable may be assessed as follows: Period of Noncompliance: Penalty Per Deliverable Per Day: One (1)to thirty(30) days $1,000 More than thirty (30) days $2,000 (c). Failure to Meet Deadlines in Appendix D. For each day Miami-Dade fails to complete the rehabilitation projects pursuant to and in accordance with the final deadlines set forth in bold in Appendix D, daily stipulated penalties may be assessed for each missed deadline as follows: Period of Noncompliance: Penalty Per Violation Per Day: One (1)to fourteen (14) days $500 Fifteen (15)to thirty(30) days $1,000 Thirty-one (31)to sixty(60) days $1,500 Sixty-one (61)to one hundred-eighty(180) days $2,000 More than one hundred-eighty(180) days $2,500 (d). Failure to Timely Implement SEP Milestones. For each day Miami-Dade fails to Timely implement a SEP milestone set forth in Section VIII (Supplemental Environmental Project)or Appendix E, daily stipulated penalties may be assessed as follows: Period of Noncompliance: Penalty Per Violation Per Day: 1 - 30 days $1,000 More than 30 days $2,000 -71- Page 576 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 75 of 101 (e). Failure to Satisfactorily Complete SEP. After receiving the SEP Completion Report, in the event EPA notifies Miami-Dade that Miami-Dade has failed to satisfactorily complete the SEP in accordance with the terms of this Consent Decree as described in Section VIII(Supplemental Environmental Project) and Appendix E (including the allowable expenditures for the SEP), a stipulated penalty of$850,000 may be assessed-if Miami-Dade does not cure the deficiencies identified in EPA's notice within ninety(90)Days after receiving such notice. Notwithstanding the foregoing, if EPA determines that Miami-Dade has made good faith efforts to satisfactorily complete the SEP and has certified,with supporting documentation, that at least ninety(90)percent of the required amount of money has been spent on the SEP, Miami- Dade shall not be liable for any stipulated penalty. 43. Stipulated penalties under this Section shall begin to accrue on the day after performance is due or on the day a violation occurs, whichever is applicable, and shall continue to accrue until performance is satisfactorily completed or until the violation ceases. Stipulated penalties shall accrue simultaneously for separate violations of this Consent Decree. 44. Miami-Dade shall pay stipulated penalties within thirty(30)Days of a written demand. EPA and/or FDEP may seek stipulated penalties under this Section by both sovereigns sending a joint written demand to Miami-Dade, or by either sovereign sending a written demand to Miami-Dade, with a copy simultaneously sent to the other sovereign. The other sovereign has twenty(20) Days from receiving the demand to elect to join in on the demand,except that EPA shall not demand or join in on a demand by FDEP for stipulated penalties that accrue pursuant to Subparagraph 42(a)(v). Either sovereign may waive stipulated penalties or reduce the amount of stipulated penalties it demands, in the unreviewable exercise of its discretion and in accordance -72- Page 577 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 76 of 101 with this Paragraph 44. Where both sovereigns demand stipulated penalties for the same violation of this Consent Decree,Miami-Dade shall pay fifty percent (50%) of the total stipulated penalty amount due to the United States and fifty percent(50%)to FDEP. Where only one sovereign demands stipulated penalties for a violation, and the other sovereign does not join in the demand within twenty (20)Days of receiving the demand,Miami-Dade shall pay the full stipulated penalties due for the violation to the sovereign making the demand. Where both sovereigns demand stipulated penalties for a violation,but only one sovereign subsequently elects to waive or reduce stipulated penalties for that violation, Miami-Dade shall pay the full stipulated penalties due for that sovereign making the full demand less any amount paid to the other sovereign. 45. Stipulated penalties shall continue to accrue as provided in Paragraph 43, during any Dispute Resolution,but need not be paid until the following: (a). If the dispute is resolved by agreement or by a decision of EPA and/or FDEP that is not appealed to the Court, Miami-Dade shall pay accrued penalties determined to be owing,together with interest,to the United States and/or FDEP within thirty(30) Days of the effective date of the agreement or the receipt of the decision or order. (b). If the dispute is appealed to the District Court and the United States prevails in whole or in part,Miami-Dade shall pay all accrued penalties determined by the District Court to be owed,together with interest, within sixty(60)Days of receiving the Court's decision or order, except as provided in Subparagraph 45(c),below. (c). If the District Court's decision is appealed, and the United States and/or FDEP prevails in whole or in part upon appeal, Miami-Dade shall pay all accrued penalties -73- Page 578 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 77 of 101 determined to be owed,together with interest,within fifteen (15)Days of receiving the final Appellate Court decision. 46. Miami-Dade shall pay stipulated penalties owing to the United States in the manner set forth and with the confirmation notices required by Paragraph 21, except that the transmittal letter shall state that the payment is for stipulated penalties and shall state for which violation(s)the penalties are being paid. Miami-Dade shall pay stipulated penalties owing to FDEP in the manner set forth in Paragraph 22. 47. If Miami-Dade fails to pay stipulated penalties according to the terms of this Consent Decree, Miami-Dade shall be liable for interest on such penalties, as provided for in 28 U.S.C.§ 1961, accruing as of the date payment became due. Nothing in this Paragraph shall be construed to limit the United States or FDEP from seeking any remedy otherwise provided by law for Miami-Dade's failure to pay any stipulated penalties. 48. Subject to the provisions of Section XV of this Consent Decree(Effect of Settlement/Reservation of Rights), the stipulated penalties provided for in this Consent Decree shall be in addition to any other rights,remedies, or sanctions available to the United States and FDEP for Miami-Dade's violation of this Consent Decree or applicable law. 49. The United States and/or FDEP shall credit Miami-Dade for any stipulated penalty paid to the sovereign with respect to any SSO pursuant to this Consent Decree in any future enforcement action in which that sovereign seeks penalties for that SSO. The United States and/or FDEP shall also credit Miami-Dade against any stipulated penalty assessed for an SSO pursuant to this Consent Decree by the amount of any penalty paid to that sovereign by Miami-Dade for the SSO in any enforcement action. -74- Page 579 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 78 of 101 50. In exercising its discretion of whether to assess a stipulated penalty for an SSO, EPA and/or FDEP will consider the amount of any sewage recovered. XI. FORCE MAJEURE 51. "Force Majeure," for purposes of this Consent Decree, is defined as any event arising from causes beyond the control of Miami-Dade, of any entity controlled by Miami-Dade, or of Miami-Dade's consultants and contractors that delays or prevents the performance of any obligation under this Consent Decree despite Miami-Dade's best efforts to fulfill the obligation. The requirement that Miami-Dade exercise"best efforts to fulfill the obligation" includes using best efforts to anticipate any potential force majeure event and best efforts to address the effects of any such event(a) as it is occurring and(b)after it has occurred to prevent or minimize any resulting delay to the greatest extent possible. "Force Majeure" does not include Miami-Dade's financial inability to perform any obligation under this Consent Decree. Where any compliance obligation under this Consent Decree requires Miami-Dade to obtain a Federal, State, or local permit or approval, Miami-Dade should submit timely and complete applications and take all other actions required by law to obtain all such permits or approvals. Miami-Dade may seek relief under the provisions of this Section XI of this Consent Decree (Force Majeure) for any delay in the performance of any such obligation resulting from a failure to obtain, or a delay in obtaining, any permit or approval required to fulfill such obligation to the extent that Miami- Dade has submitted timely and complete applications and has taken all other actions required by law to obtain all such permits or approvals. 52. If any event occurs or has occurred that may delay the performance of any obligation under this Consent Decree, whether or not caused by a Force Majeure event,Miami- -75- Page 580 of 1707 Case 1:12-cv-24400-FAM Document 25-1. Entered on FLSD Docket 06/06/2013 Page 79 of 101 Dade shall provide notice orally or by electronic or facsimile transmission to EPA and FDEP as set forth in Section XVII(Notices),within seventy-two (72)hours of when Miami-Dade first knew that the event might cause a delay. Within fourteen(14) Days thereafter, Miami-Dade shall provide in writing to EPA and FDEP an explanation and description of the reasons for the delay;the anticipated duration of the delay; all actions taken or to be taken to prevent or minimize the delay; a schedule for implementation of any measures to be taken to prevent or mitigate the delay or the effect of the delay; Miami-Dade's rationale for attributing such delay to a force majeure event if it intends to assert such a claim; and a statement as to whether, in the opinion of Miami-Dade, such event may cause or contribute to an endangerment to public health, welfare or the environment. Miami-Dade shall include with any notice all available documentation supporting the claim that the delay was attributable to a force majeure event. Failure to comply with the above requirements shall preclude Miami-Dade from asserting any claim of Force Majeure for that event for the period of time of such failure to comply, and for any additional delay caused by such failure. Miami-Dade shall be deemed to know of any circumstance of which Miami-Dade, any entity controlled by Miami-Dade, or Miami-Dade's contractors knew or should have known. 53. If EPA, after a reasonable opportunity for review and comment by FDEP, agrees that the delay or anticipated delay is attributable to a Force Majeure event,the time for performance of the obligations under this Consent Decree that are affected by the Force Majeure event will be extended by EPA, after a reasonable opportunity for review and comment by FDEP, for such time as is necessary to complete those obligations. An extension of the time for performance of the obligations affected by the force majeure event shall not, of itself, extend the -76- Page 581 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 80 of 101 time for performance of any other obligation. EPA will notify Miami-Dade in writing of the length of the extension, if any, for performance of the obligations affected by the Force Majeure event. 54. If EPA, after a reasonable opportunity for review and comment by FDEP, does not agree that the delay or anticipated delay has been or will be caused by a Force Majeure event, EPA will notify Miami-Dade in writing of its decision. 55. If Miami-Dade elects to invoke the dispute resolution procedures set forth in Section XII(Dispute Resolution), it shall do so no later than fifteen(15)Days after receipt of EPA's notice. In any such proceeding,Miami-Dade shall have the burden of demonstrating by a preponderance of the evidence that the delay or anticipated delay has been or will be caused by a Force Majeure event, that the duration of the delay or the extension sought was or will be warranted under the circumstances, that best efforts were exercised to avoid and mitigate the effects of the delay, and that Miami-Dade complied with the requirements of Paragraphs 51 and 52 above. If Miami-Dade carries this burden,the delay at issue shall be deemed not to be a violation by Miami-Dade of the affected obligation of this Consent Decree identified to EPA and the Court. XII. DISPUTE RESOLUTION 56. Unless otherwise expressly provided for in this Consent Decree,the dispute resolution procedures of this Section shall be the exclusive mechanism to resolve disputes arising under or with respect to this Consent Decree. Miami-Dade's failure to seek resolution of a dispute under this Section shall preclude Miami-Dade from raising any such issue as a defense -77- Page 582 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 81 of 101 to an action by the United States or FDEP to enforce any obligation of Miami-Dade arising under this Consent Decree. 57. Informal Dispute Resolution. Any dispute subject to Dispute Resolution under this Consent Decree shall first be the subject of informal negotiations. The dispute shall be considered to have arisen when Miami-Dade sends the United States a written Notice of Dispute. Such Notice of Dispute shall state clearly the matter in dispute. The period of informal negotiations shall not exceed twenty(20)Days from the date the dispute arises,unless that period is modified by written agreement between the United States and Miami-Dade. The United States shall consult with FDEP during the period of informal negotiations. If the United States and Miami-Dade cannot resolve a dispute by informal negotiations,then the position advanced by the United States shall be considered binding unless,within forty-five(45)Days after the conclusion of the informal negotiation period,Miami-Dade invokes formal dispute resolution procedures as set forth below. 58. Formal Dispute Resolution. Miami-Dade shall invoke formal dispute resolution procedures,within the time period provided in the preceding Paragraph,by serving on the United States and FDEP a written Statement of Position regarding the matter in dispute. The Statement of Position shall include,but need not be limited to, any factual data, analysis, or opinion supporting Miami-Dade's position and any supporting documentation relied upon by Miami- Dade. The United States shall serve its Statement of Position within one hundred(100) Days of receipt of Miami-Dade's Statement of Position. The United States' Statement of Position shall include,but need not be limited to, any factual data, analysis, or opinion supporting that position and any supporting documentation relied upon by the United States. The United States shall -78- Page 583 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 82 of 101 consult with FDEP during preparation of its Statement of Position. The United States' Statement of Position shall be binding on Miami-Dade, unless Miami-Dade files a motion for judicial review of the dispute in accordance with the following Paragraph. 59. Judicial Dispute Resolution. Miami-Dade may seek judicial review of the dispute by filing with the Court and serving on the United States and FDEP, in accordance with Section XVII of this Consent Decree (Notices), a motion requesting judicial resolution of the dispute. The motion must be filed within thirty(30)Days of receipt of the United States' Statement of Position pursuant to the preceding Paragraph. The motion shall contain a written statement of Miami-Dade's position on the matter in dispute, including any supporting factual data, analysis, opinion, or documentation, and shall set forth the relief requested and any schedule within which the dispute must be resolved for orderly implementation of the Consent Decree. The United States shall respond to Miami-Dade's motion within the time period allowed by the Local Rules of this Court. The United States shall consult with FDEP during preparation of its response. Miami-Dade may file a reply memorandum, to the extent permitted by the Local Rules. 60. Standard of Review. (a). Disputes Concerning Matters Accorded Record Review. Except as otherwise provided in this Consent Decree, in any dispute brought under Paragraphs 58 and 59 pertaining to the adequacy or appropriateness of plans,procedures to implement plans, schedules or any other items requiring approval by EPA under this Consent Decree;the adequacy of the performance of work undertaken pursuant to this Consent Decree; and all other disputes that are accorded review on the administrative record under applicable principles of administrative law, -79- Page 584 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 83 of 101 Miami-Dade shall have the burden of demonstrating,based on the administrative record,that the position of the United States is arbitrary and capricious or otherwise not in accordance with law. (b). Other Disputes. Except as otherwise provided in this Consent Decree, in any other dispute brought under Paragraphs 58 and 59, Miami-Dade shall bear the burden of demonstrating that its position complies with this Consent Decree and furthers the objectives of the Consent Decree. 61. The invocation of dispute resolution procedures under this Section shall not, by itself, extend, postpone, or affect in any way any obligation of Miami-Dade under this Consent Decree,unless and until final resolution of the dispute so provides. Stipulated penalties with respect to the disputed matter shall continue to accrue from the first day of noncompliance,but payment shall be stayed'pending resolution of the dispute as provided in Paragraph 45. If Miami-Dade does not prevail on the disputed issue, stipulated penalties shall be assessed and paid as provided in Section X(Stipulated Penalties). XIII. RIGHT OF ENTRY AND INFORMATION COLLECTION AND RETENTION 62. The United States, FDEP, and their representatives, including attorneys, contractors, and consultants, shall have the right of entry into any facility covered by this Consent Decree, at all reasonable times,upon presentation of credentials, to: (a). Monitor the progress of activities required under this Consent Decree. (b). Verify any data or information submitted to the United States or FDEP in accordance with the terms of this Consent Decree. (c). Obtain samples and,upon request, splits of any samples taken by Miami- Dade or its representatives, contractors, or consultants. -80- Page 585 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 84 of 101 (d). Obtain documentary evidence, including photographs and similar data. (e). Assess Miami-Dade's compliance with this Consent Decree. 63. Upon request, Miami-Dade shall provide EPA and FDEP or their authorized representatives splits of any samples taken by Miami-Dade. Upon request, EPA and FDEP shall provide Miami-Dade splits of any samples taken by EPA or FDEP. 64. Until five(5)years after the termination of this Consent Decree, Miami-Dade shall retain, and shall instruct its contractors and agents to preserve, all non-identical copies of all documents,records, or other information (including documents,records, or other information in electronic form) in its or its contractors' or agents' possession or control, or that come into its or its contractors' or agents' possession or control, and that relate in any manner to Miami- Dade's performance of its obligations under this Consent Decree. This information-retention requirement shall apply regardless of any contrary corporate or institutional policies or procedures. At any time during this information-retention period,upon request by the United States or FDEP, Miami-Dade shall provide copies of any documents, records, or other information required to be maintained under this Paragraph. 65. At the conclusion of the information-retention period provided in the preceding Paragraph,Miami-Dade shall notify the United States and FDEP at least ninety(90)Days prior to the destruction of any documents,records, or other information subject to the requirements of the preceding Paragraph and,upon request by the United States or FDEP,Miami-Dade shall deliver any such documents,records, or other information to the United States or FDEP. Miami- Dade may assert that certain documents, records,or other information are privileged under the -81- Page 586 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 85 of 101 attorney-client privilege or any other privilege recognized by federal law. If Miami-Dade asserts such a privilege, it shall provide the following: (a). The title of the document,record, or information. (b). The date of the document, record, or information. (c). The name and title of each author of the document,record, or information. (d). The name and title of each addressee and recipient. (e). A description of the subject of the document,record, or information. (f). The privilege asserted by Miami-Dade. However,no documents, records, or other information created or generated pursuant to the requirements of this Consent Decree shall be withheld on grounds of privilege. 66. Miami-Dade may also assert that information required to be provided under this Section is protected as Confidential Business Information("CBI")under 40 C.F.R. Part 2. As to any information that Miami-Dade seeks to protect as CBI, Miami-Dade shall follow the procedures set forth in 40 C.F.R. Part 2. 67. This Consent Decree in no way limits or affects any right of entry and inspection, or any right to obtain information, held by the United States or FDEP pursuant to applicable federal or state laws, regulations, or permits,nor does it limit or affect any duty or obligation of Miami-Dade to maintain documents,records, or other information imposed by applicable federal or state laws,regulations, or permits. XIV. NOT A PERMIT/COMPLIANCE WITH OTHER STATUTES/REGULATIONS 68. This Consent Decree is not a permit, or a modification of any permit,under any federal, State, or local laws or regulations.Nor shall this Consent Decree in any way relieve -82- Page 587 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 86 of 101 Miami-Dade of its obligation to obtain NPDES and/or Florida permits for its North, Central and South District WWTPs or any other part of its WCTS or facilities. Miami-Dade is responsible for achieving and maintaining complete compliance with all applicable federal, State, and local laws, regulations, and permits including, without limitation, the NPDES and/or Florida Permits for its North, Central and South District WWTPs or any other part of its WCTS facilities; and Miami-Dade's compliance with this Consent Decree shall be no defense to any action commenced pursuant to any such laws, regulations, or permits, except as set forth herein. The United States and FDEP do not,by their consent to the entry of this Consent Decree,warrant or aver in any manner that Miami-Dade's compliance with any aspect of this Consent Decree will result in compliance with provisions of the CWA,Florida law, or with any other provisions of federal, State, or local laws,regulations, or permits. XV. EFFECT OF SETTLEMENT/RESERVATION OF RIGHTS 69. This Consent Decree resolves the civil claims of the United States,the State and FDEP for the violations alleged in the Complaint filed in this action through the Date of Lodging of this Consent Decree. 70. The United States,the State and FDEP reserve all legal and equitable remedies available to enforce the provisions of this Consent Decree, except as expressly stated in Paragraph 69. This Consent Decree shall not be construed to limit the rights of the United States,the State or FDEP to obtain penalties or injunctive relief under the CWA,Florida law, implementing regulations, or under other federal or state laws, regulations, or permit conditions, except as expressly specified in Paragraph 69. The United States and FDEP further reserve all legal and equitable remedies to address any imminent and substantial endangerment to the public -83- Page 588 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 87 of 101 health or welfare or the environment arising at, or posed by,Miami-Dade's Sewer System, whether related to the violations addressed in this Consent Decree or otherwise. 71. In any subsequent administrative or judicial proceeding initiated by the United States or FDEP for injunctive relief, civil penalties, other appropriate relief relating to the Sewer System or Miami-Dade's violations of the CWA, Florida law, or with any other provisions of federal, State, or local laws,regulations or permits, Miami-Dade shall not assert, and may not maintain, any defense or claim based upon the principles of waiver,res judicata, collateral estoppel, issue preclusion, claim preclusion, claim-splitting, or other defenses,where the defense or claim is based upon any contention that the claims raised by the United States or FDEP in the subsequent proceeding were or should have been brought in the instant case, except with respect to claims that have been specifically resolved pursuant to Paragraph 69 of this Section. 72. This Consent Decree does not limit or affect the rights of Miami-Dade or of the United States,the State, or FDEP against any third parties,not party to this Consent Decree, nor does it limit the rights of third parties,not party to this Consent Decree, against Miami-Dade, except as otherwise provided by law. 73. This Consent Decree shall not be construed to create rights in, or grant any cause of action to, any third party not party to this Consent Decree. 74. Nothing in this Consent Decree limits the rights or defenses available under Section 309(e) of the Clean Water Act, 33 U.S.C. § 1319(e), in the event that the laws of the State, as currently or hereafter enacted,may prevent Miami-Dade from raising revenues needed to comply with this Consent Decree. -84- Page 589 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 88 of 101 XVI. COSTS 75. Except as otherwise provided in Paragraph 76 below, the Parties shall bear their own costs of this action, including attorneys' fees, except that the United States and FDEP shall be entitled to collect the costs (including attorneys' fees) incurred in any action necessary to collect any portion of the civil penalty or any stipulated penalties due but not paid by Miami- Dade. 76. Miami-Dade is currently providing funding to FDEP at the rate of$55,000 per year to monitor Miami-Dade's compliance with the terms of FDEP Consent Order OGC No.03- 1376(A) (hereinafter"FDEP CO"). When Miami-Dade's obligation to fund the FDEP CO ceases,Miami-Dade shall provide funding to FDEP to monitor Miami-Dade's compliance with the terms of this Consent Decree at the rate of$55,000 per year until this Consent Decree is terminated. However, in no event shall Miami-Dade be obligated to pay more than $55,000 for any one (1)year period under the terms of either this Consent Decree or the FDEP CO. Within thirty(30)Days of termination of this Consent Decree,FDEP shall return to Miami-Dade any unused funds. XVII. NOTICES 77. Unless otherwise specified herein,whenever notifications, submissions, or communications are required by this Consent Decree,they shall be made in writing (electronically delivery-receipt requested or by mail return-receipt requested) and addressed as follows: -85- Page 590 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 89 of 101 To the United States: Chief, Environmental Enforcement Section Environment and Natural Resources Division U.S. Department of Justice P.O. Box 7611 Ben Franklin Station Washington,D.C. 20044-7611 Re: DOJ No. 90-5-1-1-4022 Rachael Amy Kamons Environmental Enforcement Section U.S. Department of Justice P.O. Box 7611 Ben Franklin Station Washington, D.C. 20044-7611 and Chief, Clean Water Enforcement Branch Water Protection Division ATTN: Brad Ammons U.S Environmental Protection Agency,Region 4 61 Forsyth Street, S.W. Atlanta, GA 30303 (404) 562-9769 ammons.brad@epa.gov To EPA: Chief, Clean Water Enforcement Branch Water Protection Division ATTN: Brad Ammons U.S Environmental Protection Agency, Region 4 61 Forsyth Street, S.W. Atlanta, GA 30303 (404).562-9769 ammons.brad@epa.gov -86- Page 591 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 90 of 101 To the State: Jonathan A. Glogau Special Counsel Chief, Complex Litigation Office of the Attorney General PL-01, The Capitol Tallahassee,FL 32399-1050 850-414-3817 jon.glogau@myfloridalegal.com Florida Department of Environmental Protection Southeast District—Suite 200 400 N. Congress Ave. West Palm Beach, FL 33401 Attn: Compliance/Enforcement Section To FDEP: Florida Department of Environmental Protection Southeast District—Suite 200 400 N. Congress Ave. West Palm Beach, FL 33401 Attn: Compliance/Enforcement Section To Miami-Dade: County Mayor 111 NW First Street 29th Floor Miami, Florida 33128 Director Miami-Dade Water and Sewer Department 3071 SW 38th Avenue Miami,Florida 33146 County Attorney 111 NW First Street Suite 2810 Miami,Florida 33128 78. Any Party may, by written notice to the other Parties, change its designated notice recipient or notice address provided above. -87- Page 592 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 91 of 101 79. Notices submitted pursuant to this Section shall be deemed submitted upon mailing, or if submitted electronically upon delivery-receipt, unless otherwise provided in this Consent Decree or by mutual agreement of the Parties in writing. XVIII. DATE OF ENTRY 80. The Date of Entry of this Consent Decree shall be the date upon which this Consent Decree is entered by the Court or a motion to enter the Consent Decree is granted, whichever occurs first, as recorded on the Court's docket. Upon the Date of Entry of this Consent Decree, the First Partial Consent Decree and the Second and Final Partial Consent Decree shall be terminated. XIX. RETENTION OF JURISDICTION 81. The Court shall retain jurisdiction over this case until termination of this Consent Decree, for the purpose of resolving disputes arising under this Consent Decree or entering orders modifying this Consent Decree,pursuant to Sections XII (Dispute Resolution)and XX (Modification), or effectuating or enforcing compliance with the terms of this Consent Decree. XX. MODIFICATION 82. The terms of this Consent Decree, including any attached appendices,may be modified only by a subsequent written agreement signed by the United States,FDEP, and Miami-Dade. Where the modification constitutes a material change to this Consent Decree, it shall be effective only upon approval by the Court. Non-material changes to this Consent Decree (including appendices)may be made by written agreement of the United States,FDEP, and Miami-Dade without Court approval, and such parties may by mutual agreement determine whether a modification is non-material. -88- Page 593 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 92 of 101 83. Any disputes between the United States,FDEP, and Miami-Dade concerning modification of this Consent Decree shall be resolved pursuant to Section XII of this Consent Decree (Dispute Resolution),provided,however, that, instead of the burden of proof provided by Paragraph 60,the party seeking the modification bears the burden of demonstrating that it is entitled to the requested modification in accordance with Federal Rule of Civil Procedure 60(b). XXI. TERMINATION 84. This Consent Decree may be terminated when the United States determines that Miami-Dade has satisfactorily completed performance of its compliance(Section VI) and SEP (Section VIII) obligations required by this Consent Decree, provided that Miami-Dade has fulfilled all other obligations of this Consent Decree, including payment of the civil penalty under Section VII of this Consent Decree and any accrued stipulated penalties as required by Section X of this Consent Decree not waived or reduced by the United States. Miami-Dade may serve upon the United States a Request for Termination, certifying that Miami-Dade has satisfied those requirements,together with all necessary supporting documentation. 85. Following receipt by the United States of Miami-Dade's Request for Termination, the United States and Miami-Dade shall confer informally concerning the Request and any disagreement that they may have as to whether Miami-Dade has satisfactorily complied with the requirements for termination of this Consent Decree. If the United States, after consultation with FDEP, agrees that this Consent Decree may be terminated,the United States and Miami-Dade shall submit, for the Court's approval, a joint stipulation terminating the Consent Decree. 86. If the United States, after consultation with FDEP, does not agree that this Consent Decree may be terminated, Miami-Dade may invoke Dispute Resolution under Section -89- Page 594 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 93 of 101 XII of this Consent Decree. However,Miami-Dade shall not seek Dispute Resolution of any dispute regarding termination,under Paragraph 58 of Section XII (Dispute Resolution),until one hundred-twenty(120)Days after service of its Request for Termination. XXII. PUBLIC PARTICIPATION 87. This Consent Decree shall be lodged with the Court for a period of not less than thirty(30)Days for public notice and comment in accordance with 28 C.F.R. § 50.7. The United States,the State and FDEP each reserve the right to withdraw or withhold its consent if the comments regarding the Consent Decree disclose facts or considerations indicating that the Consent Decree is inappropriate, improper, or inadequate. Miami-Dade consents to entry of this Consent Decree without further notice and agrees not to withdraw from or oppose entry of this Consent Decree by the Court or to challenge any provision of the Consent Decree,unless the United States, the State or FDEP has notified the Parties in writing that it no longer supports entry of the Consent Decree. XXIII. SIGNATORIES/SERVICE 88. Each undersigned representative of Miami-Dade, the United States,the State, and FDEP certifies that he or she is fully authorized to enter into the terms and conditions of this Consent Decree and to execute and legally bind the Party he or she represents to this document. 89. This Consent Decree may be signed in counterparts, and its validity shall not be challenged on that basis. Miami-Dade agrees to accept service of process by mail and/or e-mail with respect to all matters arising under or relating to this Consent Decree and to waive the formal service requirements set forth in Rules 4 and 5 of the Federal Rules of Civil Procedure and any applicable Local Rules of this Court including,but not limited to, service of a summons. -90- Page 595 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 94 of 101 XXIV. INTEGRATION 90. This Consent Decree constitutes the final, complete, and exclusive agreement and understanding among the Parties with respect to the settlement embodied in this Consent Decree and supersedes all prior agreements and understandings,whether oral or written, concerning the settlement embodied herein. Prior drafts of this Consent Decree shall not be used in any action involving the interpretation or enforcement of this Consent Decree. Other than Deliverables that are subsequently submitted and approved pursuant to this Consent Decree, no other document, nor any representation, inducement, agreement,understanding, or promise, constitutes any part of this Consent Decree or the settlement it represents,nor shall it be used in construing the terms of this Consent Decree. XXV. FINAL JUDGMENT 91. Upon approval and entry of this Consent Decree by the Court,this Consent Decree shall constitute a final judgment of the Court as to the United States,the State, FDEP, and Miami-Dade. The Court finds that there is no just reason for delay and therefore enters this judgment as a final judgment under Fed. R. Civ. P. 54 and 58. XXVI. APPENDICES 92. The following appendices are attached to and part of this Consent Decree: "Appendix A" is the Adequate Treatment and Transmission Capacity Criteria; "Appendix B" is the Volume Sewer Customer Ordinance Program Implementation; "Appendix C" is the US EPA Region IV CMOM guidance; "Appendix D" is the Work Plan for Specific Capital Improvement Projects; and -91- Page 596 of 1707 Case 1:12-cv-24400-FAM Document 254 Entered on FLSD Docket 06/06/2013 Page 95 of 101 "Appendix E" is the description of the Supplemental Environmental Project. Dated and entered this_day of , . 1 UNITED STATES DISTRICT JUDGE Southern District of Florida -92- Page 597 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 96 of 101 WE l IiI RF:BY COF\SI-.N'1 to the entry of this Consent Decree; subject w the public notice and comment provisions of 28 C.F.R. a 50.7: FOR(PLAINTIFF UNITED STATICS OF AMERICA: • .,NAC1A S, MOREN O Assistant Attorney General U.S. Department of Justice: Environment and Natural Resources Division i621.4(.1",/ RACHAEL Y KAMONS Trial Attorney U.S, Department of'Justice l-Invironment and Natural Resources Division t:Avironniental I'nforcement Section P.O. Box 7611 Ben Franklin Station Washington,D.C. 20044-7611 Telephone: 202-514-5260 Facsimile: 202-616-2427 rachacl.kamons,cit u sdoj.gov WIFREDO A, FE'•RRER United States Attorney Southern District of Florida • _93_ Page 598 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 97 of 101 WE HEREBY CONSENT to the entry of this Consent Decree, subject to the public notice and comment provisions of 28 C.F.R. § 50.7: FOR PLAINTIFF UNITED STATES OF AMERICA(Continued): 1/ 7i, /4t'LL V. A E HEARD Acting Regional Counsel United States Environmental Protection Agency Region 4 - WILLIAM B. BUSH, JR. Associate Regional Counsel United States Environmental Protection Agency Region 4 61 Forsyth Street Atlanta,GA 30303 Telephone: 404-562-9538 Facsimile: 404-562-9486 bush.william@epa.gov -94- Page 599 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 98 of 101 WE HEREBY CONSENT to the entry f this Consent Decree,subject to the public notice and comment provisions of 28 C.F.R• $ 50.7: FOR PLAINTIFF UNITED STATES OF AMERICA(Continued): • te, I cli lip a 1111 1 C.Y, A GILES Assi t Administrator Office of Enforcement and Compliance Assurance United States Environmental Protection Agency SUSAN.S IINICMAN Office Director Office or Civil Enforcement Office of Enforcement and Compliance Assurance United States Environmental Protection Agency -2;1 M P L!NS Division Director Water Enforcement Division Office of Civil Enforcement Office of Enforcement and Compliance Assurance United States Environmental Protection Agency A „era'. ALAN ORRISSEY ✓ Senior Attorney water Enforcement Division Office of Civil Enforcement Office of Enforcement and Compliance Assurance United States Environmental Protection Agency 1200 Pennsylvania Ave.,NW(2243A) • Washington,DC 20460 Telephone: 202-564-4026 Facsimile: 202-564-0024 m rissey_alan(a?cpa.gov -95- Page 600 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 99 of 101 FOR PLAINTIFF STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION: JEFF ITTLEJOHN;P.E. Deputy Secretary for Regulatory Programs Florida Department of Environmental Protection Douglas Building 3900 Commonwealth Blvd Tallahassee,Florida 32399-3000 Telephone: 850-245-2037 Facsimile: 850-245-2147 -96- Page 601 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 100 of 101 FOR PLAINTIFF STATE OF FLORIDA: PAMELA JO BONDI Atto eneral •L -F JPAT • . G +GA -clorida Bar Num a-r 371823 r Special Counsel 7 Chief, Complex Litigation Office of the Attorney General PL-01,The Capitol Tallahassee,FL 32399-1050 Telephone: 850-414-3300, ext. 4817 Facsimile: 850-414-9650 jon.glogau@myfloridalegal_com -97- Page 602 of 1707 Case 1:12-cv-24400-FAM Document 25-1 Entered on FLSD Docket 06/06/2013 Page 101 of 101 FOR DEFENDANT MIAMI-DADE COUNTY,a political subdivision of the State of Florida: THE HO •RAB;ARLOS A. GIMENEZ Mayor Miami-Dade County R.A. CUEVAS,JR. Miami-Da. • ounty Attorney / ' N. GILLMAN F orida Bar Number 793647 Assistant County Attorney 111 NW 1st Street Suite 2810 Miami,Florida 33128 Telephone: 305-375-2149 Facsimile: 305-375-5611 hgill@miamidade.gov -98- Page 603 of 1707 Case 1:12-cv-24400-FAM Document 25-2 Entered on FLSD Docket 06/06/2013 Page 1 of 11 APPENDIX A Adequate Pumping, Transmission and Treatment Capacity Program Criteria (A). Definitions. Whenever the terms set forth below are used in this Appendix, the following definitions shall apply: (i). High Annual Monthly Average ("HAMA") shall mean the largest value within the last twelve(12)Months of the monthly daily average pump operating time for each Pump Station. Miami-Dade will be granted one exemption per twelve (12)-Month period for any monthly average exceeding the fifteen(15)hours per day if the high hours were caused by a maintenance problem that has been addressed and resolved. (ii). Sewer Extension shall mean any sewer project that requires either a general or individual construction permit as defined by the current edition of Chapter 62-604 of the Florida Administrative Code. (iii). Yearly Nominal Daily Average Pump Operating Time ("NAPOT") for each Pump Station shall be defined as the average of daily average pump operating time for all Months falling within the previous 365 days, divided by one less than the total number of pumps installed in that station. The pump hours shall be based on metered running time or derived from power used by station pump motors. As an alternative to the elapsed running time meters on the pumps in a Pump Station, the monthly average daily pump operating hours for Pump Stations with multi-speed and variable speed pumps may be determined based on the average power consumption of the pumps in the station over the previous reporting period. For multi-speed Pump Stations, the station shall be determined to have a monthly daily average pump operating time value of 10.00 hours per day if the power usage for the previous month was equal to forty- six percent(46%) of the power that would be used by all of the station pumps but one running at 1 Page 604 of 1707 Case 1:12-cv-24400-FAM Document 25-2 Entered on FLSD Docket 06/06/2013 Page 2 of 11 full rated power for the reporting period. The actual monthly daily average pump operating time value will be determined on a linear proportional basis from the actual power used by the pumps during the previous month. For stations with variable speed pumps, the equivalent daily average pump operating time shall be determined based on the power used and the type of variable speed drive as follows: (a). For Pump Stations driven by variable frequency drives, the equivalent 10.00 hours per day monthly daily average pump operating time shall be reached when the Pump Station uses in one Month forty-nine percent(49%)of the power used by all of the station pumps but one running at full rated power for the reporting period. (b). For Pump Stations driven by magnetic variable speed drives,the equivalent 10.00 hours per day monthly daily average pump operating time shall be reached when the Pump Station uses in one Month sixty-five percent(65%) of the power used by all of the station pumps but one running at full rated power for the reporting period. (c). For Pump Stations driven by resistor bank variable speed drives,the equivalent 10.00 hours per day monthly daily average pump operating time shall be reached when the Pump Station uses in one Month sixty-one percent(61%) of the power used by all of the station pumps but one running at full rated power for the reporting period. (iv). Yearly Projected Nominal Daily Average Pump Station.Operating Time ("Projected NAPOT") shall be defined as the Yearly Nominal Daily Average Pump Operating Time plus the calculated additional operating hours expected as a result of all anticipated sewage flow resulting from all previously authorized additional sewer flows. 2 Page 605 of 1707 Case 1:12-cv-24400-FAM Document 25-2 Entered on FLSD Docket 06/06/2013 Page 3 of 11 (B). Additional Sewer Flows Authorization. Miami Dade shall authorize only those additional sewer flows in accordance with the Code of Miami-Dade, as amended, and as provided for below: (i). No Miami-Dade or municipal officer, agent, employee, or board shall approve, grant or issue any building permit,certificate of use and occupancy (except for changes in ownership) or Local Business Tax Receipt(LBTR),municipal occupational license (except for changes in ownership) for any land use served or to be served by a publicly or privately owned or operated sanitary sewer collection system prior to obtaining a sanitary sewer certification of adequate capacity. A sanitary sewer certification of adequate capacity shall be issued after demonstrating that the receiving collection and transmission system, and the treatment plant(s),have adequate capacity, as defined herein,to handle the additional flow. The sanitary sewer certification of adequate capacity is subject to the following conditions: (a). When associated with a building permit or other permit that authorizes construction(herein collectively"a construction permit"): (1). A sanitary sewer certification of adequate capacity obtained prior to an application (including applicable forms and plans) for a construction permit being submitted shall expire and be null and void and be of no further force and effect unless an application for a construction permit is submitted and a process number obtained from the building department or permit issuing department within ninety(90) days from the date of the sanitary sewer certification of adequate capacity is issued. If an application for building permit is submitted,the sanitary sewer certification of adequate capacity shall thereafter expire in accordance with subparagraphs(B)(i)(a)(2) and(3)below. 3 Page 606 of 1707 Case 1:12-cv-24400-FAM Document 25-2 Entered on FLSD Docket 06/06/2013 Page 4 of 11 (2). A sanitary sewer certification of adequate capacity obtained subsequent to an application (including applicable forms and plans)for a construction permit being submitted shall expire and be null and void and be of no further force and effect when the application for the construction permit expires. (3). When a construction permit is issued with a sanitary sewer certification of adequate capacity,the sanitary sewer certification of adequate capacity shall expire and be null and void and be of no further force and effect within one hundred-fifty(150) days of the construction permit expiration unless said permit is renewed or replaced. In all other events,the sanitary sewer certification of adequate capacity shall expire after one hundred-eighty(180) days or upon the issuance of the certificate of use or certificate of occupancy or other use authorization. (C). Adequate Treatment Capacity Criteria. Adequate treatment capacity shall be demonstrated by Miami-Dade's certification that the WWTP that will receive flow from newly authorized additional sewer flow will not be in "non-compliance" as defined in 40 C.F.R. Part 123.45,App. A, at the time the WWTP receives the flow from the newly authorized additional sewer flow. (D). Adequate Transmission Capacity Criteria. Adequate transmission capacity shall mean that each Pump Station receiving the additional sewer flow, and all Pump Stations through which such sewage flow is transmitted to the WWTP receiving the flow, is operating with a Projected NAPOT equal to or less than ten(10)hours per day. If the above condition is not met by a booster type station, the station will be considered to have adequate transmission capacity if so determined by a peak capacity study conducted by Miami-Dade that takes into consideration 4 Page 607 of 1707 Case 1:12-cv-24400-FAM Document 25-2 Entered on FLSD Docket 06/06/2013 Page 5 of 11 adjacent Pump Stations and downstream force mains. Transmission capacity certifications authorizing additional sewer flows shall be issued according to the following criteria: (i). For projects with an existing connection to sewers or connecting to an existing collection system and therefore not requiring a sewer extension permit in the public right of way: (a). If there is adequate transmission capacity, as defined in subparagraph (A)(iii)above, for all Pump Stations through which sewage flow from the sewer service connection is transmitted to the wastewater treatment facility receiving such sewage flow, certification can be granted without restrictions, or (b). If adequate transmission capacity does not exist, as defined in subparagraph(A)(iii) above,unrestricted certification can be granted only if all of the following conditions are met for all Pump Stations through which sewage flow from the sewer service connection is transmitted to the wastewater treatment facility receiving such sewage flow: (1). The proposed flows will cause an increase equal to or less than 0.5 hours per day to the Projected NAPOT and, (2). after including the additional proposed flows,the Projected NAPOT will be equal to or less than twelve(12)hours per day and, (3). the additional proposed flows are less than 10,000 GPD and, (4). the Pump Station is not out of compliance due to sanitary sewer overflows. (ii). For projects requiring a sewer extension in the public right-of-way within an existing Pump Station basin: 5 Page 608 of 1707 Case 1:12-cv-24400-FAM Document 25-2 Entered on FLSD Docket 06/06/2013 Page 6 of 11 (a). If adequate transmission capacity exists at the Pump Station and all Pump Stations through which sewage flow from the sewer service connection is transmitted to the WWTP receiving such sewage flow, certification can be granted without restrictions only if: (1). the new project Average Daily Flow is equal to or less than 1,000 GPD or, (2). the HAMA for all Pump Stations through which sewage flow from the sewer service connection is transmitted to the WWTP receiving such sewage flow is equal to or less than fifteen (15)hours per day or, (3). the HAMA for any Pump Stations through which sewage flow from the sewer service connection is transmitted to the WWTP receiving such sewage flow is greater than fifteen(15)hours per day but a peak capacity study conducted by Miami Dade, that takes into consideration adjacent Pump Stations and downstream force mains,has determined that the new flows can be accommodated without any upgrades to the system and no sanitary sewer overflows have occurred in the station's basin within the previous twelve (12)months; (b). If adequate transmission capacity exists but the HAMA is greater than fifteen(15)hours per day for any Pump Stations through which sewage flow from the sewer service connection is transmitted to the WWTP receiving such sewage flow and a peak capacity study conducted by Miami Dade,that takes into consideration adjacent Pump Stations and downstream force mains,has determined that the new flows can only be accommodated after the system has been upgraded and/or one or more sanitary sewer overflows of 1,000 gallons or more have occurred in last twelve (12)months, certifications will be conditioned to: (1). Completion of the required upgrade and/or 6 Page 609 of 1707 Case 1:12-cv-24400-FAM Document 25-2 Entered on FLSD Docket 06/06/2013 Page 7 of 11 (2). Implementation of measures to prevent the reoccurrence of sanitary sewer overflows. (iii). For projects requiring a new collection system,Pump Station and Force Main, a peak capacity study conducted by Miami Dade,that takes into consideration adjacent Pump Stations and downstream force mains,will determine under what conditions the new system is allowed to connect to the Miami-Dade's transmission system. (E). SSO Criteria. Notwithstanding Miami-Dade's ability to demonstrate capacity in accordance with the terms and conditions of paragraphs (C)and(D) above,Miami-Dade shall not authorize any additional sewer flows to the collection system if: (i). SSOs have occurred in the receiving Pump Station's basin or in a Force Main that is required to receive the flow from the Pump Station that fall under the following criteria: (a). There is a reported SSO of 1,000 gallons or more, or a reported SSO that reaches surface water, in the station's collection basin caused by a lack of capacity in the collection piping or the Pump Station,until the capacity of the system is changed to prevent a future overflow. (b). There are two or more reported SSOs of 1,000 gallons or more each, or two or more reported SSOs that reach surface water,within the last twelve (12) Months caused by blockages in the collection piping for the Pump Station,until a remedial plan directed at preventing the reoccurrence of these overflows has been implemented.Notwithstanding the foregoing, additional sewer flows may be allowed if the receiving portion of the collection system is not located upstream from those areas of the collection system that have experienced five (5)or more SSOs due to blockages within the previous twelve(12)Months. 7 Page 610 of 1707 Case 1:12-cv-24400-FAM Document 25-2 Entered on FLSD Docket 06/06/2013 Page 8 of 11 (c). There are two or more SSOs of 1,000 gallons or more each, or two or more reported SSOs that reach surface water, within the last twelve (12)Months in a force Main required to receive the flow from the Pump Station due to failure of the Force Main pipe, until a remedial plan directed at preventing the reoccurrence of these overflows has been implemented. SSOs caused by contractor activities will not be considered for this item. (ii). The newly authorized sewer service connection may reasonably be expected to cause Miami-Dade to violate the effluent limitations in the NPDES permit for the WWTP that will receive the flow from the newly authorized sewer service connection; or (iii). The WWTP that will receive flow from the newly authorized sewer service connection is in"non-compliance" as defined in 40 C.F.R. Part 123.45,App. A. (F). Adequate Transmission and Treatment Capacity Certification Report. Miami-Dade shall certify on a monthly schedule that adequate transmission and treatment capacity exists until the termination of this Consent Decree. Miami-Dade shall certify that adequate transmission and treatment capacity exists (as defined in this Appendix)to receive flow for each newly authorized sewer service connection, and shall prepare on a monthly basis in an electronic file a summary report which identifies each newly authorized certification of available capacity, and which shall include, at a minimum, the following information: (i). The date of approval of the newly authorized certification of available capacity. (ii). The address and the precise point of discharge to the collection system of the newly authorized certification of available capacity. (iii). The estimated volume of wastewater projected to be discharged from the newly authorized certification of available capacity. 8 Page 611 of 1707 Case 1:12-cv-24400-FAM Document 25-2 Entered on FLSD Docket 06/06/2013 Page 9 of 11 (iv). The estimated date of issuance of a certificate of occupancy; (v). The actual date of the issuance of the certificate of occupancy; (vi). The identity and location of the Pump Station immediately downstream from the newly authorized certification of available capacity. (vii). The description of the source or use(e.g. restaurant, dwelling unit) for the newly authorized certification of available capacity. (viii). Whether the issuance of a building permit was dependent on a collection system improvement. (G). Pump Station Operating Time Report. Miami Dade shall certify on a monthly basis, the following information as to each of the collection system Pump Stations: (i). Pump Station number. (ii). Pump Station location. (iii). NAPOT for the previous 365 days. (iv). Projected NAPOT based upon accumulated authorized flows. (v). HAMA for the previous 365 days. (H). Remedial Action Plan Requirement. Where the certification required by paragraph (G) above indicates that Miami Dade's Pump Station(s)' NAPOT(actual or projected)exceeds the capacity criteria set forth in paragraphs (C), (D)and (E)above: (i). Miami-Dade shall prepare,within thirty (30) days of the certification required by paragraph (G) above, a remedial action plan that sets forth a program that will ensure adequate transmission capacity,and provide a schedule for completion of that program. (ii). When a Pump Station has been reported as having inadequate capacity,and a remedial action plan has been provided, conditional flow allocations may be made to the Pump 9 Page 612 of 1707 Case 1:12-cv-24400-FAM Document 25-2 Entered on FLSD Docket 06/06/2013 Page 10 of 11 Station with the condition that no certificate of occupancy or use may be issued for the facility until Miami Dade or the VSC has certified that the proposed remedial action plan has been completed. (iii). When a remedial action plan for a Pump Station has been certified as complete by Miami-Dade or the VSC,the Pump Station will be monitored for one (1)year. If, during this period,the most recent monthly report of station operating hours is less than ten (10) hours per day,the station will be listed as having adequate capacity. If, during this period, the most recent monthly report of station operating hours is greater than ten (10)hours per day,the station will be listed as not having adequate capacity. If it is shown at the end of this period that the remedial action plan has not provided a remedy to the condition causing the station to be listed as having inadequate capacity,the station will again be listed as having inadequate capacity. In this event, no additional sewer flows shall be authorized, and no building permit(s) shall be issued, until adequate treatment and transmission capacity can be demonstrated as specified in paragraphs(C),(D) and (E) above. Pump Stations or portions of a collection system that are out of compliance due to SSOs will also be monitored for one (1) year after completion of a remedial action plan. If within this period,the station experiences one (1) SSO of 1,000 gallons or more, or that reaches surface water, the station will again be listed as having inadequate capacity. In this event,no additional sewer flows shall be authorized, and no building permit(s)shall be issued,until adequate treatment and transmission capacity can be demonstrated as specified in paragraphs(C), (D) and(E) above. (I). Exemption. Notwithstanding the terms and conditions of paragraphs(B), (C), (D) and(E) above, Miami-Dade may authorize new additional sewer flows without the required certifications of adequate treatment and transmission capacity in those cases where a pollution or 10 Page 613 of 1707 Case 1:12-cv-24400-FAM Document 25-2 Entered on FLSD Docket 06/06/2013 Page 11 of 11 sanitary nuisance condition exists as the result of the discharge of untreated wastewater from an on-site septic tank. Miami-Dade shall authorize such connections only after: (i). Miami Dade has verified and documented the existence of the pollution or sanitary nuisance condition; and (ii). Miami Dade has documented the nature of the nuisance condition, and the address and the precise point of the discharge to the collection system. 11 Page 614 of 1707 Case 1:12-cv-24400-FAM Document 25-3 Entered on FLSD Docket 06/06/2013 Page 1 of 4 APPENDIX B Volume Sewer Customer Ordinance Program Implementation (A). Every Volume Sewer Customer("VSC") shall specifically be required to comply with EPA documents for the capacity, management, operation, and maintenance of the VSC collection and transmission systems including EPA 305-B-05-002, Guide for Evaluating Capacity, Management, Operation and Maintenance (CMOM) Programs at Sanitary Sewer Collection Systems,and EPA Region 4 Guide to Collection and Transmission System Management, Operation and Maintenance Programs, Version 1.1, or the latest version. (B). Within six (6)Months after all modifications to the VSC Ordinance have been made as described in subparagraph 18(e)of this Consent Decree, each VSC shall provide a detailed plan ("Plan of Compliance")to Miami-Dade for complying with the requirements described in subparagraphs 18(e)(ii) and(iii)of this Consent Decree. Within sixty(60)Days of receipt of Miami-Dade's comments on the submittal of the Plan of Compliance, the VSC shall make the corrections required by Miami-Dade and resubmit the required plan to Miami-Dade. If the resubmittal is again disapproved by Miami-Dade,the VSC shall have thirty(30)Days upon notification of the disapproval to make the required corrections and resubmit the Plan of Compliance to Miami-Dade. Upon approval of the resubmitted documents, or upon approval of the initial submittal, the VSC shall immediately commence to implement the actions described in the Plan of Compliance according to the time periods provided below. If the VSC does not provide the required documents within the times noted, or if the second resubmittal is determined to be inadequate, or the VSC does not implement the actions proposed in a timely manner, the VSC shall be determined to be nonresponsive. Miami-Dade shall not issue any certification of I Page 615 of 1707 Case 1:12-cv-24400-FAM Document 25-3 Entered on FLSD Docket 06/06/2013 Page 2 of 4 adequate capacity for new sanitary sewer flow for any facility served by a VSC determined to be nonresponsive. (C). The VSC shall comply with the requirements of subparagraph 18(e)(iii) according to the following schedule: (a). 18(e)(iii)(A). Sewer Overflow Response Plan: The written part of the overflow plan shall be delivered as a part of the Plan of Compliance. The training required for this section shall be completed within six(6) months of the approval of the Plan of Compliance. The records program required for this section shall be completed within six(6) Months of the approval of the Plan of Compliance. The rain event inspection routes required for this section shall be created within six(6) Months of the approval of the Plan of Compliance. (b). 18(e)(iii)(B). Information Management System Program: The required information management system program shall be implemented within one (1)year of the approval of the Plan of Compliance. (c). 18.(e)(iii)(C). Sewer System Asset Management Plan: The identification of critical assets,the determination of life cycle costs, and the statement of level of service shall be included in the Plan of Compliance. The long term funding plan shall be provided within one year of Plan of Compliance. (d). 18(e)(iii)(D). Gravity Sewer System Operation and Maintenance Program: The schedules of inspections and preventative maintenance actions shall be provided with the Plan of Compliance. The initial inspections and identification of maintenance needs shall be completed within one year of the approval of the Plan of Compliance. The engineering evaluation of required corrosion controls shall be completed within one (1)year of the approval of the Plan of Compliance. The prioritization for evaluation 2 Page 616 of 1707 Case 1:12-cv-24400-FAM Document 25-3 Entered on FLSD Docket 06/06/2013 Page 3 of 4 of the gravity sewers shall be completed within six(6)Months of the approval of the Plan of Compliance. The staffing requirements for the collection system operations and maintenance shall be met within six(6)Months of the approval of the Plan of Compliance. (e). 18(e)(iii)(E). Pump Station Operations and Preventative Maintenance Program: The identification of means of internal communications,the technical specifications for each Pump Station, a description of the monitoring and control system for each Pump Station, and written preventative operations and maintenance schedules shall be provided with the Plan of Compliance. The listing of required resource commitments including staffing, contractual support and equipment shall be provided within six(6)Months of the approval of the Plan of Compliance. The written standard emergency operations and maintenance procedures shall be provided with the Plan of Compliance. (f). 1 8(e)(iii)(F). Force Main Operations,Preventative • Maintenance and Assessment/Rehabilitation Program: The standard procedures for the assessment of Force Mains and procedures for the repair,replacement, and rehabilitation of Force Mains shall be provided with the Plan of Compliance. The assessment of the Force Mains in the collection and transmission system shall be completed within six (6)Months of the approval of the Plan of Compliance. The assessment of the Force Main easements and a schedule for maintenance of the easements shall be completed within six(6) Months of the approval of the Plan of Compliance. All of the Force Main deficiencies discovered in the initial inspection shall be remedied within five(5) years of the approval of the Plan of Compliance. (g). General: All of the staffing requirements not otherwise noted shall be satisfied within twelve (12)Months of the approval of the Plan of Compliance. All 3 Page 617 of 1707 Case 1:12-cv-24400-FAM Document 25-3 Entered on FLSD Docket 06/06/2013 Page 4 of 4 requirements of Paragraph 18(e)not otherwise designated shall be satisfied within twelve (12) Months of the approval of the Plan of Compliance. (D). Starting two (2)years after the Effective Date of the Consent Decree each VSC shall provide,by January 31 of each year, a report describing what changes have been determined to be necessary to update the VSC's CMOM program for the upcoming year. The report shall include,at a minimum,the current staffing level in all positions,new work required to maintain the VSC's collection and transmission system, new capital work identified in the previous year, training carried out during the previous year, SSOs from the system during the previous calendar year, and corrective actions for the SSOs, Pump Stations determined to have inadequate capacity during the previous calendar year, and the corrective plans for those Pump Stations. 4 Page 618 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 1 of 126 00Ep ST,4rFs GUIDE FOR EVALUATING CAPACITY, • MANAGEMENT, OPERATION, AND ate ` �' �z MAINTENANCE (CMOM) PROGRAMS � � W y �'�-FI, AT SANITARY SEWER COLLECTIONtc• � &tL CYC*"- 'PRO Page 619 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 2 of 126 United States Environmental Protection Agency Office of Enforcement and Compliance Assurance(2224A) EPA 305-B-05-002 www.epa.gov January 2005 Page 620 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 3 of 126 Guide for Evaluating CMOM Programs at Wastewater Collection Systems TABLE OF CONTENTS 1. Introduction 1-1 1.1 Purpose of This Guide 1-1 1.2 Terminology 1-1 1.3 How to Use the Guide 1-2 1.4 Overview of Underlying Issues 1-3 1.5 Purpose of CMOM Programs 1-4 1.6 National Pollutant Discharge Elimination System Regulatory Requirement 1-5 1.7 EPA Region 4 MOM Programs Project 1-6 2. Collection System Capacity,Management,Operation, and Maintenance Programs 24 2.1 Collection System Management 2-4 2.1.1 Organizational Structure 2-4 2.1.2 Training 2-10 2.1.3 Internal Communication 2-11 2.1.4 Customer Service 2-11 2.1.5 Management Information Systems 2-13 2.1.6 SSO Notification Program 2-14 2.1.7 Legal Authority 2-15 2.2 Collection System Operation 2-17 2.2.1 Budgeting 2-18 2.2.2 Monitoring 2-19 2.2.3 Hydrogen Sulfide Monitoring and Control 2-20 2.2.4 Safety 2-21 2.2.5 Emergency Preparedness and Response 2-22 2.2.6 Modeling 2-24 2.2.7 Mapping 2-25 2.2.8 New Construction 2-26 2.2.9 Pump Stations 2-26 2.3 Equipment and Collection System Maintenance 2-27 2.3.1 Maintenance Budgeting 2-28 2.3.2 Planned and Unplanned Maintenance 2-28 2.3.3 Sewer Cleaning 2-33 2.3.4 Parts and Equipment Inventory 2-35 2.4 Sewer System Capacity Evaluation - Testing and Inspection 2-36 2.4.1 Flow Monitoring 2-37 2.4.2 Sewer System Testing 2-38 2.4.3 Sewer System Inspection 2-39 2.5 Sewer System Rehabilitation 2-41 i Page 621 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 4 of 126 Guide for Evaluating CMOM Programs at Wastewater Collection Systems 3.0 Checklist for Conducting Evaluations of Wastewater Collection System Capacity,Management, Operation,and Maintenance (CMOM) Programs 3-1 Appendix A Example Collection System Performance Indicator Data Collection Form A-1 Appendix B Example Interview Schedule and Topics B-1 Appendix C Information Sources C-1 References R-1 ii Page 622 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 5 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems CHAPTER 1. INTRODUCTION 1.1 Purpose of this Guide This guide identifies some of the criteria used by EPA to evaluate a collection system's management, operation, and maintenance(CMOM)program activities. The guide is intended for use by EPA and state inspectors as well as the regulated community—owners or operators of sewer systems collecting domestic sewage as well as consultants or other third-party evaluators or compliance assistance providers. Collection system owners or operators can review their own systems by following the checklist in Chapter 3 to reduce the occurrence of sewer overflows and improve or maintain compliance. The guidance herein may also be taken a step further. If a federal or state reviewer observes a practice that does not effectively meet the elements of a CMOM program,he or she may make recommendations to educate the operator, inspector, case developer, or those involved in a settlement agreement. Additionally,having key board members (policy makers)read this guide will also allow them to better understand the benefits of investing in good CMOM programs. The guide is applicable to small, medium, and large systems;both publicly and privately owned systems; and both regional and satellite collection systems. Regardless of size, each owner or operator will have an organization and practices unique to its collection system. While these specific characteristics will vary among systems,the CMOM concepts and best management practices are likely to apply to all types of systems. Where appropriate,this document provides guidance on the differences. This document does not,however, substitute for the CWA or EPA's regulations,nor is it a regulation itself. Thus, the document does not and cannot impose legally binding requirements upon these circumstances. EPA and state decision-makers retain the discretion to adopt approaches on a case-by- case basis that differ from this guidance where appropriate. EPA may change this guidance in the future. Individuals reviewing a collection system are strongly encouraged to read the guidance portion of this document prior to conducting a review. Reviewers should use the checklist in Chapter 3 as the primary tool for questions during the paperwork and/or onsite review of the collection system. While some sections or topics may not appear to relate directly to environmental performance,taken as a whole, they provide an indication of how well the utility is run. 1.2 Terminology To provide a more user-friendly guidance and for clarification,the terminology for several terms has been modified. The following paragraphs list these terms and reasoning for the modifications. Frequently,the term"COLLECTION SYSTEM OWNER OR OPERATOR", abbreviated as "OWNER OR OPERATOR," is used in this guide and refers to the entities responsible for the administration and oversight of the sewer system and its associated staff(in either a municipal or industrial context); capacity evaluation, management, operation, and maintenance programs; equipment; and facilities. The owner and operator may be two different entities. For example,the owner may own the infrastructure and be responsible for its maintenance while it designates responsibility for the day to day operation of 1-1 Page 623 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 6 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems the system to the operator. It should be noted that the term used in EPA's CMOM Program Self Assessment Checklist is "MUNICIPAL WASTEWATER UTILITY OPERATORS"or"UTILITY" rather than"collection system owner or operator."Both refer to the same individual(s). The term "REVIEW" is used in this document in place of"INSPECTION" or"AUDIT."Because "inspection" often refers to an evaluation conducted by the regulatory authority and"audit"has been used to refer to an evaluation with very specific requirements, "review" is more appropriately used to capture the wider universe of evaluations (e.g., those conducted by a regulatory authority,the system itself, and/or by a third-party). Similarly,the term used to describe the person conducting the CMOM review is the"REVIEWER"— this could be either an inspector, a third party reviewer hired by the owner or operator, or personnel of the owner or operator performing a self-evaluation of the collection system. The term "FACILITY" is used in this document to refer to the components of the collection system (e.g.,pump stations, sewer lines). 1.3 How to Use the Guide The guide and checklist provide a three-tiered approach to the CMOM review: • Evaluation of the CMOM program, based on interviews with management and field personnel, as well as observation of routine activities and functions • Review of pertinent records and information management systems • Evaluation based on field/site review Chapter 2 provides a breakdown and overview of each CMOM concept and what to look for when reviewing the system, defines the CMOM elements for the reviewer, and follows through with a discussion of the indicators or other clues about which the reviewer should be aware. Chapters 2 and 3 present detailed information on conducting reviews of collection systems. Chapter 3 contains the comprehensive reviewer checklist, supported by the information in Chapter 2. Appendix A presents a Collection System Performance Indicator Data Collection Form which provides examples of the types of information a reviewer should attempt to obtain while on-site. The"one size does not fit all" approach to reviewing CMOM programs cannot be overstated. The principles covered in this guide are applicable to all wastewater collection systems,however,these principles may be implemented through different means depending on the system. Larger systems may have the resources and the need to implement more costly and complex means of meeting the CMOM program elements. In occasional cases a CMOM feature may not be implemented at all, due to characteristics of the system. A reviewer should be able to look at the system as a whole and determine whether certain key elements are present or should be present and to what extent the system incorporates the CMOM principles. Reviewers will also find that the location or names of some documents, logs, or reports may vary from system to system. This guide tries to provide a general description of the materials the reviewer should request. 1-2 Page 624 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 7 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems Although use of this guide cannot guarantee a collection system will avoid permit violations or discharge violations, generally,when owners or operators adequately practice the principles laid out in the guide,they should experience fewer problems and,therefore, fewer instances of noncompliance. 1.4 Overview of the Underlying Issues Sanitary sewer collection systems are designed to remove wastewater from homes and other buildings and convey it to a wastewater treatment plant. The collection system is a critical element in the successful performance of the wastewater treatment process. EPA estimates that collection systems in the U.S. have a total replacement value between$1 to $2 trillion. Under certain conditions,poorly designed,built, managed, operated, and/or maintained systems can pose risks to public health, the environment, or both. These risks arise from sanitary sewer overflows (SSOs) from the collection system or by compromised performance of the wastewater treatment plant. Effective and continuous management, operation, and maintenance, as well as ensuring adequate capacity and rehabilitation when necessary, are critical to maintaining collection system capacity and performance while extending the life of the system. EPA believes that every sanitary sewer system has the �. capacity to have an SSO. This may be due to a number of factors including, but not limited to: • J`T f • Blockages '"`?• - • Structural, mechanical, or electrical failures ' • Collapsed or broken sewer pipes ==1 . • Insufficient conveyance capacity ., +' • Vandalism _' ` �,',•. TA Additionally, high levels of inflow and infiltration (I/I) during wet weather can cause SSOs. Many collection SSOs include untreated discharges from sanitary sewer systems that reach waters of the United States systems that were designed according to industry (photo:US EPA). standards experience wet weather SSOs because levels of I/I may exceed levels originally expected;prevention of I/I has proven more difficult and costly than anticipated; or the capacity of the system has become inadequate due to an increase in service population without corresponding system upgrades(EPA 2004). SSOs can cause or contribute to environmental and human health impacts(e.g., water quality standards violations, contamination of drinking water supplies,beach closures, etc.)which, in addition to flooded basements and overloaded wastewater treatment plants, are some symptoms of collection systems with inadequate capacity and improper management, operation,and maintenance. These problems create the need for both the owner or operator and the regulatory authority to conduct more thorough evaluations of sanitary sewer collection systems. 1-3 Page 625 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 8 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems 1.5 Purpose of CMOM Programs CMOM programs incorporate many of the standard operation and maintenance activities that are routinely implemented by the owner or operator with a new set of information management requirements in order to: • Better manage, operate, and maintain collection systems • Investigate capacity constrained areas of the collection system • Proactively prevent SSOs • Respond to SSO events The CMOM approach helps the owner or operator provide a high level of service to customers and reduce regulatory noncompliance. CMOM can help utilities optimize use of human and material resources by shifting maintenance activities from"reactive"to "proactive"—often leading to savings through avoided costs due to overtime,reduced emergency construction costs, lower insurance premiums, changes in financial performance goals, and fewer lawsuits. CMOM programs can also help improve communication relations with the public, other municipal works and regional planning organizations, and regulators. It is important to note that the collection system board members or equivalent entity should ensure that the CMOM program is established as a matter of policy. The program should not be micro-managed,but an understanding of the resources required of the operating staff to implement and maintain the program is necessary. In CMOM planning, the owner or operator selects performance goal targets, and designs CMOM activities to meet the goals. The CMOM planning framework covers operation and maintenance (O&M) planning, capacity assessment and assurance, capital improvement planning, and financial management planning. Information collection and management practices are used to track how the elements of the CMOM program are meeting performance goals, and whether overall system efficiency is improving. On an periodic basis,utility activities should be reviewed and adjusted to better meet the performance goals. Once the long-term goal of the CMOM program is established, interim goals may be set. For instance, an initial goal may be to develop a geographic information system(GIS) of the system. Once the GIS is complete, a new goal might be to use the GIS to track emergency calls and use the information to improve maintenance planning. An important component of a successful CMOM program is periodically collecting information on current systems and activities to develop a"snapshot-in-time" analysis. From this analysis,the owner or operator evaluates its performance and plans its CMOM program activities. Maintaining the value of the investment is also important. Collection systems represent major capital investments for communities and are one of the communities' major capital assets. Equipment and facilities will deteriorate through normal use and age. Maintaining value of the capital asset is a major goal of the CMOM program. The infrastructure is what produces sales and service. Proper reinvestment in capital facilities maintains the ability to provide service and generate sales at the least cost possible and helps ensure compliance with environmental requirements. As a capital asset,this will result in the 1-4 Page 626 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 9 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems need for ongoing investment in the collection system and treatment plant to ensure design capacity while maintaining existing facilities and equipment as well as extending the life of the system. The performance of wastewater collection systems is directly linked to the effectiveness of its CMOM program. Performance characteristics of a system with an inadequate CMOM program include frequent blockages resulting in overflows and backups. Other major performance indicators include pump station reliability, equipment availability, and avoidance of catastrophic system failures such as a collapsed pipe. A CMOM program is what an owner or operator should use to manage its assets; in this case,the collection system itself. The CMOM program consists of a set of best management practices that have been developed by the industry and are applied over the entire life cycle of the collection system and treatment plant. These practices include: • Designing and constructing for O&M . • Knowing what comprises the system(inventory and physical attributes) —~ • Knowing where the system is(maps and location) . • Knowing the condition of the system(assessment) • Planning and scheduling work based on condition and performance - • Repairing,replacing, and rehabilitating system components ir based on condition and performance • • Managing timely, relevant information to establish and prioritize appropriate CMOM activities? • Training of personnel I 1.6 National Pollutant Discharge Elimination System Regulatory Requirement Sewer rehabilitation can include lining The National Pollutant Discharge Elimination System(NPDES) aging sewers(photo:NJ Department of Environmental Protection). program prohibits discharges of pollutants from any point source into the nation's waters except as authorized under an NPDES permit. EPA and state NPDES inspectors evaluate collection systems and treatment plants to determine compliance with permit conditions including proper O&M. Among others,these permit conditions are based on regulation in 40 CFR 122.41(e): "The permittee shall at all times properly operate and maintain all facilities and systems of treatment and control(and related appurtenances)which are installed or used by the permittee to achieve compliance with the conditions of this permit." When violations occur,the collection system or wastewater treatment plant owner or operator can face fines and requirements to implement programs to compensate residents and restore the environment. For example, in June 2004,the U.S.District Court for the Southern District of Ohio entered a consent decree resolving CSO, SSO, and wastewater treatment plant violations at the Hamilton County sewer system in Cincinnati, Ohio. In addition to a$1.2 million civil penalty, the settlement included programs to clean up residents' basements, compensate residents, and implement measures to prevent further basement backups. The settlement also includes over$5.3 million in supplemental environmental projects. 1-5 Page 627 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 10 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems 1.7 EPA Region 4 MOM Programs Project EPA Region 4 created the"Publicly Owned Treatment Works MOM Programs Project"under which the Region invites permitted owners or operators, and contributing satellite systems, in watersheds it selects to perform a detailed self-assessment of the management, operation, and maintenance (MOM)programs associated with their collection system. Participants provide a report which includes the results of the review, any improvements that should be made, and schedules to make those improvements. Participants that identify and report a history of unpermitted discharges from their collection system, and a schedule for the necessary improvements, can be eligible for smaller civil penalties while under a remediation schedule. EPA's Office of Compliance coordinated with EPA Region 4 on the development of this CMOM Guide. This guide is based in part on material obtained from the Region 4 MOM Programs Project. Some of the more specific items of the Region 4 program have been omitted in order to provide a more streamlined review framework. The fundamental concepts behind CMOM have been maintained in this guide. By combining elements of the Region's program with existing NPDES inspection guidance, this CMOM Guide provides a comprehensive framework for reviewers and regulated communities to evaluate the effectiveness of O&M throughout the collection system. 1-6 Page 628 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 11 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems CHAPTER 2. COLLECTION SYSTEM CAPACITY, MANAGEMENT, OPERATION, AND MAINTENANCE PROGRAMS This chapter provides an overview of the CMOM program elements. The information will help evaluate wastewater collection system operation and maintenance (O&M)practices. The key elements of the CMOM program, which are presented in detail in the following sections, include: • Collection System Management • Collection System Operation • Collection System Maintenance • Collection System Capacity Evaluation In addition to this overview,there are several areas(e.g., 2.1.3 Internal Communications, 2.1.4 Customer Service, etc.) in this guide that go into greater depth regarding the operation and maintenance of a collection system. The intent of this detail is not only to provide the owner or operator with suggestions as to what to look for in their own program, but to provide the reviewer a complete overview of good operations, in general,regardless of a particular item resulting in poor performance or a violation. For EPA and state inspectors or other reviewers, conducting an evaluation of collection system CMOM programs shares many similarities with other types of compliance reviews. Overall,the reviewer would examine records, interview staff and conduct field investigations, generally in that order although tailored, if necessary,to meet site-specific needs. Prior to performing the on- site interviews and evaluations, preliminary information may be requested that will provide an overall understanding of the organization to allow for a more focused approach for the review. This information also provides a basis for more detailed data gathering during on site activities. The information typically requested prior to the review should include a schematic map of the collection system (could be as-built drawings) and any written operations or maintenance procedures. Depending on the volume of information,the collection system owner or operator may need ample lead time to gather and copy these documents. Alternatively, the reviewer may offer to examine the documents and bring them back when doing the on-site review so that extra copies are not necessary.No matter which method is used,the importance of up-front preparation cannot be overemphasized. With the exception of pump stations and manholes, much of the collection system is not visible. Therefore,the more complete the reviewer's understanding of the system is prior to the review, the more successful the assessment will be. The reviewer would then proceed with the on-site activities. Guidance for conducting compliance reviews is provided in the NPDES Compliance Inspection Manual(EPA 2004). The manual provides the general procedures for performing compliance reviews and is a valuable source of information on such topics as entry, legal authority, and responsibilities of the reviewer. Although CMOM evaluations are not specifically addressed in the manual, the general 2-1 Page 629 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 12 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems review procedures can be applied to CMOM reviews. Another good reference for general review information is the Multi-Media Investigations Manual, NEIC(EPA 1992). Some issues with entry are specific to CMOM reviews. Some facilities may be on private property and the reviewer may need property owner consent for entry. Documents to Review On-site Include: • Organization chart(s) • Staffing plans • Job descriptions • Sewer use ordinance • Overall map of system showing facilities such as pump stations,treatment plants,major gravity sewers,and force mains • O&M budget with cost centers' for wastewater collection • Performance measures for inspections,cleaning,repair,and rehabilitation • Recent annual report,if available • Routine reports regarding system O&M activities • Collection system master plan • Capital improvement projects(CIP)plan • Flow records or monitoring • Safety manual • Emergency response plan • Management policies and procedures • Detailed maps/schematics of the collection system and pump stations • Work order management system • O&M manuals • Materials management program • Vehicle management and maintenance records • Procurement process • Training plan for employees • Employee work schedules • Public complaint log • Rate ordinance or resolution • Financial report("notes"section) • As built plans • Discharge monitoring reports(DMRs) The above list is not all inclusive nor will all utilities necessarily have formal,written documentation for each of the items listed. The Collection System Performance Indicator Data Collection Form, included as Appendix A,provides examples of the types of information a reviewer should attempt to obtain while on- site. Reviewer-Point to Note Interviews are generally conducted with line A schedule should be established by the reviewer for managers and supervisors who are the staff interviews and field assessments. responsible for the various O&M activities A cost center is any unit of activity,group of employees,line of products,etc.,isolated or arranged in order to allocate and assign costs more easily. 2-2 Page 630 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 13 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems and support services staff from engineering, construction, human resources, and purchasing, where appropriate. Appendix B presents an example agenda and schedule that would be used for a large collection system owner or operator. The collection system's size and physical characteristics will determine the length of time needed for the review. A guideline for the time required, given a two person review team,would be two days for a small system, and a week or more for large systems. Field reviews are typically conducted after interviews. The following is a list of typical field sites the team should visit: • Mechanical and electrical maintenance shop(s) • Fleet maintenance facilities (vehicles and other rolling stock) • Materials management facilities (warehouse, outside storage yards) • Field maintenance equipment storage locations (i.e., crew trucks,mechanical and hydraulic cleaning equipment, construction and repair equipment, and television inspection equipment) • Safety equipment storage locations • Pump stations • Dispatch and supervisory control and data acquisition(SCADA) systems • Crew and training facilities • Chemical application equipment and chemical storage areas (use of chemicals for root and grease control,hydrogen sulfide control [odors, corrosion]) • Site of SSOs, if applicable • A small,but representative, selection of manholes Collection system operators typically assist with manhole cover removal and other physical activities. The inspector should refrain from entering confined spaces. A confined space is defined by the Occupational Safety and Health Administration(OSHA) as a space that: (1)is large enough and so configured that an employee can bodily enter and perform assigned work; and(2)has limited or restricted means for entry or exit; and(3) is not designed for continuous employee occupancy [29 CFR 1910.146(b)]. A"permit-required confined space(permit space)" is a confined space that has one or more of the following characteristics: (1)contains or has a potential to contain a hazardous atmosphere; (2) contains a material that has the potential for engulfing an entrant; (3)has an internal configuration such that an entrant could be trapped or asphyxiated by inwardly converging walls or by a floor which slopes downward and tapers to a smaller cross-section; or(4)contains any other recognized serious safety or health hazard [29 CFR 1910.146(b)]. Though OSHA has promulgated standards for confined spaces,those standards do not apply directly to municipalities, except in those states that have approved plans and have asserted jurisdiction under Section 18 of the OSHA Act. Contract operators and private facilities do have to comply with the OSHA requirements and the inspector may find that some municipalities elect to do so voluntarily. In sewer collection systems,the two most common confined spaces are the underground pumping station and manholes. The underground pumping station is typically entered through a relatively narrow metal or concrete shaft via a fixed ladder. Inspectors conducting the field evaluation component of the CMOM audit should be able to identify and 2-3 Page 631 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 14 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems avoid permit-required confined spaces. Although most confined spaces are unmarked, confined spaces that may have signage posted near their entry containing the following language: DANGER—PERMIT REQUIRED—CONFINED SPACE AUTHORIZED PERSONNEL ONLY If confined space entry is absolutely necessary, inspectors should consult with the collection system owner or operator first, have appropriate training on confined space entry, and use the proper hazard detection and personal safety equipment. More information on confined space entry can be found in Operation and Maintenance of Wastewater Collection Systems Volumes I and II(California State University(CSU) Sacramento 1996; CSU Sacramento 1998). 2.1 Collection System Management Collection system management activities form the backbone for operation and effective maintenance activities. The goals of a management program should include: • Protection of public health and prevention of unnecessary property damage • Minimization of infiltration, inflow and exfiltration, and maximum conveyance of wastewater to the Management Documents to Review wastewater treatment plant • Organization chart(s) • Provision of prompt response to • Staffing plans—Number of people and service interruptions classifications • Efficient use of allocated funds • Job descriptions for each classification • Identification •of and remedy • Sewer• Safety me ordinance manual solutions to design, construction, • Training program documentation and operational deficiencies • Notes to financial reports • Performance of all activities in a safe manner to avoid injuries Without the proper procedures, management and training systems, O&M activities may lack organization and precision, resulting in a potential risk to human health and environmental contamination of surrounding water bodies, lands, dwellings, or groundwater. The following sections discuss the common elements of a robust collection system management program. 2.1.1 Organizational Structure Well-established organizational structure,which delineates responsibilities and authority for each position, is an important component of a CMOM program for a collection system. This information may take the form of an organizational chart or narrative description of roles and 2-4 Page 632 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 15 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems responsibilities, or both. The organizational chart should show the overall personnel structure, including operation and maintenance staff. Additionally,up-to-date job descriptions should be available. Job descriptions should Reviewer-Point to Note include the nature of the work performed, The reviewer may want to note the turnover rate and the minimum requirements for the position, current levels of staffing(i.e.,how many vacant the necessary special qualifications or positions exist and for how long they have been certifications, examples of the types work, vacant).This may provide some indication of potential understaffing,which can create response lists of licences required for the position, problems. performance measures or promotion potential. Other items to note in regard to the organizational structure are the percent of staff positions currently vacant, on average,the length of time positions remain vacant, and the percent of collection system work that is contracted out. Reviewers should evaluate specific qualifications of personnel and determine if the tasks designated to individuals, crews, or teams match the job descriptions and training requirements spelled out in the organizational structure. From an evaluation standpoint, the reviewer might try to determine what type of work is performed by outside contractors and what specific work is reserved for collection system personnel. If much of the work is contracted, it is appropriate to review the contract and to look at the contractor's capabilities. If the contractor handles emergency response, the reviewer should examine the contract with the owner or operator to determine if the emergency response procedures and requirements are outlined. The inclusion of job descriptions in the organizational structure ensures that all employees know their specific job responsibilities and have the proper credentials. Additionally, it is Reviewer-Point to Note useful in the course of interviews to discuss A reviewer should look for indications that staff management. The reviewer should note responsibilities are understood by employees.Such whether staff receive a satisfactory indications may include training programs,meetings explanation of their job descriptions and between management and staff,or policies and procedures. responsibilities. In addition, when evaluating the CMOM program,job descriptions will help a reviewer determine who should be interviewed. When evaluating the organizational structure,the reviewer should look for the following: • Except in very small systems, operation and maintenance personnel ideally should report to the same supervisor or director. The supervisor or director should have overall responsibility for the collection system. • In some systems,maintenance may be carried out by a city-wide maintenance 2-5 Page 633 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 16 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems organization,which may also be responsible for such diverse activities as road repair and maintenance of the water distribution system. This can be an effective approach, but only if adequate lines of responsibility and communication are established. • In general, one supervisor should manage a team of individuals small enough that is safe and effective. However, the individuals on the team may have additional employees reporting to them. This prevents the top supervisors from having to track too many individuals. The employee-supervisor ratio at individual collection systems will vary depending on their need for supervisors. In a utility with well-established organizational structure, staff and management should be able to articulate their job and position responsibilities. Personnel should be trained to deal with constantly changing situations and requirements, both regulatory and operational. The system's personnel requirements vary in relation to the overall size and complexity of the collection system. In very small systems,these responsibilities may include operation of the treatment plant as well as the collection system. In many systems, collection system personnel are responsible for the stormwater as well as wastewater collection system. References providing staff guidelines or recommendations are available to help the reviewer determine if staffing is adequate for the collection system being reviewed. Following is a list of available references: • Manpower Requirements for Wastewater Collection Systems in Cities of 150,000 to 500,000 Population (EPA 1974) • Manpower Requirements for Wastewater Collection Systems in Cities and Towns of up to 150,000 Population (EPA 1973) • Operation and Maintenance of Wastewater Collection Systems,Volume II (California State University (CSU) Sacramento 1998) Volumes I and II of Operations and Maintenance of Wastewater Collection Systems can be obtained through: Office of Water Programs California State University Sacramento 6000 J Street Sacramento, CA 95819-6025 phone: 916/278-6142 www.owp.csus.edu The following tables have been taken from the two EPA documents listed above to provide the reviewer with guidance. However,these documents may not take into account technological advances that have occurred since their publication date that might reduce staffing requirements. For instance, advances in remote data acquisition and telemetry have likely reduced the number 2-6 Page 634 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 17 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems of field inspection staff needed for systems with several pump stations. Other system-specific characteristics should also be accounted for when using these tables. An example of this might be collection systems that are not primarily constructed of brick will not require the masons the tables specify. 2-7 Page 635 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 18 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems STAFF COMPLEMENTS FOR WASTEWATER COLLECTION SYSTEM MAINTENANCE POPULATION SIZE (Estimated Number of Personnel) Occupational Title 5,000 10,000 25,000 50,000 100,000 • (a) (b) (a) r (b) (a) (b) (a) (b) (a) (b) Superintendent 1 5 1 10 1 20 1 40 1 40 Assistant Superintendent Maintenance Supervisor 1 40 2 80 Foreman 1 15 I 20 1 20 1 40 1 40 Maintenance Man II 1 15 1 20 1 20 I 40 1 40 Maintenance Man I 1 15 1 20 2 60 3 120 5 200 Mason II 1 40 1 40 Mason I 1 40 Maint.Equipment Personnel 1 40 2 80 3 120 Construction Equipment Personnel 1 15 1 20 1 20 1 40 1 40 Auto.Equipment Personnel 1 40 Photo.Inspection Technician 1 40 Laborer 1 15 1 20 2 40 2 80 5 200 Dispatcher 1 40 2 80 Clerk Typist 1 20 1 20 •Stock Clerk 1 40 1 40 Sewer Maint.Staff 6 80 6 110 9 220 16 620 27 1,060 Maintenance Mechanic II see comment(c)below Maintenance Mechanic I see comment(d)below Maintenance Mechanic Helper see comment(d)below Construction Inspection Supervisor see comments(e)and(f)below Total Staff (a)Estimated number of personnel. (b)Estimated total man-hours per week. (c)Multiply number of lift stations maintained by 8/3. (d)Multiply number of lift station visits per week by 1. (e)Multiply estimated construction site visits per week by 8/3. (f)Determined by the number of Construction Inspectors employed and developed on a judgmental basis. Unit processes included in this staffmg table are: 1.Maintenance of sanitary sewer main lines&appurtenances(laterals not included). 2.Maintenance of storm sewer main lines. 3.Maintenance of lift stations. 4.Inspection of newly constructed sewer main lines and appurtenances. (U.S.EPA 1973) 2-8 Page 636 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 19 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems STAFF COMPLEMENTS FOR WASTEWATER COLLECTION SYSTEM MAINTENANCE POPULATION SIZE (Estimated Number of Personnel) Occupational Title 150,000 200,000 300,000 400,000 500,000 Superintendent 1 1 1 1 1 Assistant Superintendent 1 1 1 I I Maintenance Supervisor II 1 1 1 I 1 Maintenance Supervisor 1 1 2 2 3 3 Equipment Supervisor 1 1 1 1 1 TV Technician II 1 2 2 3 3 TV Technician I 1 2 2 3 3 Foreman 2 3 4 5 6 Maintenance Man II 3 5 6 8 9 Maintenance Man I 11 17 22 29 33 Mason II 1 2 2 3 3 Mason I 1 2 2 3 3 Maintenance Equipment Personnel 6 8 12 15 18 Construction Equipment Personnel 3 4 6 8 9 Auto.Equipment Personnel 2 3 4 5 6 Laborer 7 10 14 18 22 Dispatcher 2 2 2 3 3 Stock Clerk 1 2 2 3 3 Clerk Typist 2 2 2 3 3 Sewer Maintenance Staff 48 70 88 116 131 Maintenance Mechanic II see comment(a)below Maintenance Mechanic I see comment(b)below Maintenance Mechanic Helper see comment(b)below Electrician see comment(c)below Construction Inspector Supervisor see comment(d)below Construction Inspector see comment(e)below Total Staff (a)Divide number of lift stations maintained by 15. (b)Divide number of lift station visits per week by 40 (c)Divide number of lift stations maintained by 15. (d)Determined by the number of Construction Inspectors employed and developed on a judgmental basis. (e)Divide estimated daily construction site visits by 2. Unit processes included in this staffing table are: 1.Maintenance of sanitary sewer main lines&appurtenances(laterals not included). 2.Maintenance of storm sewer main lines. 3.Maintenance of lift stations. 4.Inspection of newly constructed main lines and appurtenances. (U.S.EPA 1974) 2-9 Page 637 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 20 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems 2.1.2 Training The commitment of management to training is key to a successful program. It is important to recognize training as a budget expense item. A guideline for the typical amount of funding for training is three to five percent of the gross budget for the collection system. However, in large collection systems or those undergoing extensive construction this percentage may be considerably lower, and,in systems with a high turnover,training costs may be higher due to orienting new employees. Other changes, such as incorporation of new technology,will have a short-term impact on training costs. Although training is not explicitly required under current regulations, a collection system with untrained or poorly trained collection system personnel runs a greater risk of experiencing noncompliance. The following elements are essential for an effective training program: • Fundamental mission, goals, and policies of the collection system are addressed • Mandatory training requirements are identified for key employees • On-the-job training progress and performance are measured • Effectiveness of the training is assessed including periodic testing, drills, or demonstrations • New employees receive training The owner or operator should generally provide training in the following areas: • Routine line maintenance (may be on-the-job training only) • Safety during confined space entry (every system should also have a strict policy and permit program) • Traffic control (where applicable) • Record keeping Sources of Training • Pump station O&M Training is required to safely perform inspections, • Electrical and instrumentation(may follow replacement procedures,and lubricate and be a combination of formal and on- clean parts and equipment.Following are the many the-job training) sources of maintenance training: • Public relations and customer service • Manufacturer • SSO/Emergency response • In-house • Pump station operations and • On-the-job(OJT) maintenance • Industry-wide(e.g.,consultants,regulatory • Pipe repair;bursting or cured in place authorities,professional associations,or pipe(CIPP); or closed circuit TV and educational institutions) • trench/shoring(where these activities are not outsourced) The training program should identify the types of training required and offered. Types of training vary,but may include general environmental awareness, specific equipment,policies and 2-10 Page 638 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 21 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems procedures, and conducting maintenance activities. If the owner or operator is Owner or Operator-Point to Note The owner or operator should routinely assess the carrying out its own training,the reviewer effectiveness of training through periodic testing, should evaluate one or more examples of drills,demonstrations,or informal reviews,and training materials to answer the following improve training based on this assessment. questions: are the materials appropriate to the training topic and the level of those being trained; and are they likely to accomplish the intended goal? 2.1.3 Internal Communication Communication is essential to ensuring that collection systems run efficiently and effectively. It is especially important that an effective communication link exists between wastewater treatment plant operators and collection system crews as well as with other municipal departments. Effective communication requires the top-down, bottom-up, and lateral exchange of information amongst staff. Examples of top-down communication are bulletin board posters, paycheck inserts,regular staff meetings, e-mail or informal brown-bag lunch discussions. Examples of bottom-up communication may include the establishing environmental committees, confidential hotlines, e-mail, or direct open discussions. Collection system owners or operators may also offer incentives to employees for performance, and encourage them to submit suggestions for ways to improve the performance of the collection system. "Front line"employees are often an excellent source of ideas, issues, and information about how to improve performance at the work site. In this context,the reviewer can check for morale-boosting activities or reward programs, such as "Employee of the Month" and"Employee of the Year." The reviewer should attempt to determine lines of internal communication to ensure all employees receive information and have an appropriate forum to provide feedback. The reviewer should assess the level of communication by interviewing several levels of staff or by simply observing collection system teams on work assignments. The owner or operator should have procedures and be able to demonstrate internal communication between the various levels and functions of the collection system regarding its management, operation, and maintenance programs. 2.1.4 Customer Service The community often knows very little about the wastewater treatment and collection services performed for them. The community may only be aware of the collection system and its owner or operator through articles in local newspapers,public radio and television announcements, or only when there is an SSO. Collection system representatives should talk to schools and universities,make presentations to local officials and businesses about the wastewater field. Formal presentations can also be given to citizens, building inspectors, public utility officials, 2-11 Page 639 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 22 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems and members of the media. An effective customer service and public relations program ensures that the owner or operator addresses all incoming inquiries,requests, and complaints in a timely fashion. From this information, owners or operators may further develop or revise programs to better address areas of concern. The reviewer should examine customer service records for the following: • Personnel who received the complaint or request • Date and nature of the complaint or request • Location of the problem • Name, address, and telephone number of the customer • Cause of the problem • To whom the follow-up action was assigned • The initial date of the follow-up action • Date the complaint or request was resolved • Total days to end the problem • Feedback to the customer Awareness of past issues,population served,compliance history, and other elements help a reviewer determine whether the amount and types of inquiries,requests, or complaints are increasing or decreasing.For example,there Reviewer-Point to Note To fully understand the context of customer may have been many complaints during only inquiries,requests,or complaints,a reviewer should a certain week. The reviewer can examine understand the history,topography,boundaries,and those records to determine if there were demographics of the collection system's jurisdiction specific circumstances (e.g., a large before site evaluations are conducted. precipitation event)that caused the increase in inquiries or complaints. Employees who handle customer service should be specifically trained to handle complaints, requests, or inquiries. These employees should be provided with sample correspondence, Q/A's, or"scripts"to help guide them through written or oral responses to customers. The reviewer should look for procedures on how to answer the telephone, e-mail, and other communication used by personnel. A reviewer may evaluate staff telephone responses by evaluating: • The number of persons available to answer calls • The number of repeat callers • The average length of calls • The volume of calls per day Collection system field crews and their activities are the most visible segment of any wastewater treatment organization. Workers project a public image for their system on city and town streets. For this reason,personnel need to be trained in what to expect in public situations. For example, • 2-12 Page 640 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 23 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems collection system supervisory staff should be familiar with the areas around public rights-of-way and easements to which their field crews must gain access to service facilities. Additionally, crew leaders should know how to deal with the public when approached. Collection systems field crews influence the public's confidence in the collection system owner or operator. Reviewers should observe whether personnel wear uniforms or not, and if vehicles and equipment are identifiable as utility property and kept in good working order. Vehicles should be equipped with adequate emergency lighting and flashers,traffic control signs and barriers, etc. Before major construction or maintenance work begins, owners or operators should notify homeowners where properties may be affected. Methods of notification may include door hangers, newspaper notices, fliers, signs, or public radio or television announcements. Information should also be provided to residents on cleanup and safety procedures following basement backups and other overflows. 2.1.5 Management Information Systems The ability of the owner or operator to effectively manage its collection system is directly related to its ability to maintain access to the most current information concerning the facilities. 1.w kL Maintenance of this current information is an ' effort involving all members of the collection :'._' • • system from the staff answering the telephone to the worker in the street. Operational IiF information informs and clarifies financial • information. This will make the financial 4: information more useful for the policy makers, leading to better decisions. A satisfactory management information system should provide the owner or operator with the following advantages: A growing number of sewer systems have shifted to computer-based collection system management[photo:Milwaukee Metropolitan • Maintain preventive maintenance and Sewerage District(MMSD)]. inspection schedules • Offer budgetary justification • Track repairs and work orders • Organize capital replacement plans • Manage tools and equipment inventories • Create purchase orders • Record customer service inquiries, complaints, or requests • Provide measurement of effectiveness of program and O&M activities Owners and operators have been shifting to computer-based systems to manage data. Only the smaller collection system owners or operators may still rely on paper management systems. 2-13 Page 641 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 24 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems Computer-based Maintenance Management Systems (CMMSs) are designed to manage the data needed to track the collection system's O&M performance. Geographic Information Systems (GIS) are used to map and locate facilities and because of computer-based compatibility, can often easily be integrated with a CMMS. The computer-based system however, can only be as accurate as the data used to develop it,which was most likely paper files. Regardless of the information management Types of Management Information Tracking style chosen, the collection system should have written instructions regarding the use of • Customer service the management information systems. These • Safety incident procedures may include operating the system, • Emergency response • Process change upgrading the system, accessing data and • Inspection scheduling and tracking information, and generating and printing • Monitoring and/or sampling schedules reports. The system should be kept current • Compliance with accurate information. Work reports from • Planned maintenance(schedules and work the field crews should be complete, accurate, orders) • Parts inventory and legible. The reviewer may select some number of complaints and see how well they can be tracked through the system to an ultimate conclusion. Work reports generated by the field crew should be randomly chosen and scanned for legibility and completeness. The reviewer should do a random check of the timeliness and accuracy of data entry. Additionally,the reviewer should obtain selected original data sources(such as field reports) and compare them to the appropriate database output to determine how long entry takes. This will provide a check on how current the database is and what data entry backlog exists. 2.1.6 SSO Notification Program The owner or operator should maintain a written procedure indicating the entities, (e.g., drinking water purveyors, the public,public health officials, and the regulatory authority)that should be notified in the event of an SSO. The procedure should clearly indicate the chain of Reviewer-Point to Note communication used to notify the proper personnel of an To verify the effectiveness of the S SO event for reporting and remediation. Theprocedure notificationhodprogram,nthe reviewer p g should walk an overflow should include the names, titles, phone numbers, and occurrence report through the chain responsibility of all personnel involved. The reviewer of events that would occur from should verify that the personnel listed in the procedure are the time of initial notification. still in the position listed and are aware of their responsibilities. The procedure may allow for different levels of response for different types of SSOs. For example, the regulatory authority may request that SSOs due to sewer line obstructions be 2-14 Page 642 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 25 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems reported on a monthly basis. Therefore,the procedure may simply be to gather this information from the maintenance information system and have the appropriate personnel put together a reporting form. A chronic SSO at a pump station that discharges when overloaded during wet weather may require a more complex notification procedure, including immediate telephone notification to specified authorities. To verify the effectiveness of the notification program,the reviewer should walk an overflow occurrence report through the chain of events that would occur from the time of initial notification. This can be done by choosing several random overflow events from the complaint records and observing whether they are handled as procedures dictate. The minimum information that should be reported for an SSO includes the date,time, location, cause,volume of the overflow(which may be estimated),how it was stopped, and any remediation methods taken. The reviewer should not only verify that the SSO notification procedures are appropriate,but also verify that the owner or operator has reliable methods for the detection of overflows and a phone number or hotline for the public to report observed overflow events. 2.1.7 Legal Authority The collection system owner or operator should select and enforce the legal authority necessary to regulate the A satellite community is a volume of flow entering the collection system, including collection systems which does not residential and commercial customers, satellite own the treatment facility to which communities and industrial users. The legal authority may it discharges. take the form of sewer use ordinances, contracts, service agreements, and other legally binding documents. The pretreatment program seeks to prevent the discharge of materials into the sewer system (by non-domestic users)that interfere with proper operation of the wastewater treatment plant or may pass through the plant untreated. At the time the operator of a wastewater treatment plant submits its pretreatment program to the regulatory authority for approval,the plant operator must include a statement from the city solicitor or other legal authority that the plant has the authority to carry out the program [40 CFR 403.9(a)(1)]. The reviewer should verify the existence of this statement and inquire as to whether any significant changes have occurred in the program such that the legal authority may need further review. Additionally, some owners or operators may have a pretreatment program approved by the state,through which discharge permits are issued to industrial users and enforcement is conducted. Further information on legal authority under the pretreatment program may be found in Procedures Manual for Reviewing a POTW Pretreatment Program Submission(EPA 1983). 2-15 Page 643 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 26 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems The owner or operator should have the authority to ensure that new and rehabilitated sewers and connections have been properly designed, constructed, and tested before being put MEM Procedures Manual OTVV into service. This authoritycould take for Reviewing a gram Pretreatment Program the form of design and performance Submission specifications in a sewer use ordinance or other legal document such as a statute or series of contracts or joint powers agreements. The ordinance or legal --� document should contain, at a minimum, r... general prohibitions, adequate grease control requirements and measures, prohibitions on stormwater inflow, +^� ILA- infiltration from laterals, and news construction standards. The grease control section of the document should contain the requirement to install grease traps at appropriate facilities (e.g.,restaurants). Additionally, these facilities should be required to properly maintain the grease traps and pump them out on a regular basis. The document should also address periodic inspections of grease traps by collection system personnel and the ability to enforce(i.e., levy fines on persistent offenders). General Prohibitions The owner or operator should maintain strict control over the connection of • Fire and explosion hazards private sewer laterals to sewer mains. • Corrosive and obstructive materials These connections have significant • Material which may cause interference at the potential as sources of infiltration. wastewater treatment plant Standards for new connections should be • Heat which may inhibit biological activity at the wastewater treatment plant clearly specified. The sewer use • Oils or petroleum products which may cause ordinance should contain provisions for interference or pass through the wastewater treatment inspection, approval of new connections, plant and a program to implement the requirements.A method to maintain control over existing connections is to require an inspection of the lateral prior to sale of a property. It is important to note that implementing this type of program may require a change to the local ordinance or code. 2-16 Page 644 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 27 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems The owner or operator should also have the legal authority to prohibit stormwater connections to the sanitary sewer. Stormwater connections may include F catch basins; roof, cellar and yard drains; sump e1 pumps; direct connections between the storm and sanitary sewers; leaking manhole covers; uncapped cleanouts; and the direct entrance of streams into the collection system. This practice is now discouraged. Direct stormwater connections to a separate sanitary sewer system are known as inflow. Inflow can • severely impact the ability of the collection system to transport flows to the treatment plant during wet weather, leading to overflows and noncompliance Sources of stormwater in the collection system with the wastewater treatment plant's NPDES may include building downspouts connected directly to the system(photo:MMSD). permit. Satellite communities should not be allowed to contribute excessive flows that cause or contribute to overflows, flooding, or noncompliance at the wastewater treatment plant. Should any of these situations exist, it is not sufficient for the owner or operator to charge the satellite community for Owner or Operator-Point to Note the excess flow. The owner or operator must be able to The owner or operator should have a prohibit the contribution of the excess flow. This may be comprehensive program which addresses flows from satellite done through a legal inter jurisdictional agreement communities. between the wastewater treatment plant owner or operator and the satellite community that addresses allowable flows and sets requirements. The reviewer should examine all contracts between systems and their satellites (unless too numerous, then select representative contracts). Contracts should have a date of termination and allow for renewal under renegotiated terms. Contracts should limit flow from satellite communities and limit peak wet weather flow rates. 2.2 Collection System Operation Collection systems have little of what is traditionally Owner or Operator-Point to Note referred to as "operability" as compared to a There should be detailed,written wastewater treatment plant(i.e.,the number of ways to procedures available to guide owners or operatorsthrough flow routing activities.route the wastewater is typically limited). However, Also, Also,there should be the design of some collection systems does allow flow operating procedures for mechanical to be diverted or routed from one pipe to another or equipment such as pump station pump even to different treatment plants. This can be on/off and service rotation settings or accomplished by redirecting flow at a pump station in-line grit removal(grit trap) from one discharge point to another or opening and operations. closing valves on gravity sewers and force mains. 2-17 Page 645 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 28 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems There are many reasons why the owner or operator may want to divert flows; among them,to relieve overloading on a system of piping or the wastewater treatment plant or to add more flow to piping serving an area not yet fully developed to maintain a cleansing velocity. 2.2.1 Budgeting The budget is one of the most important variables in the CMOM program. Although an adequate budget is not a guarantee of a well operated collection system, an inadequate budget will make attaining this goal difficult. Funding can come from a Reviewer-Point to Note variety of sources, including user fees or appropriations Reviewers need to determine the from the state or local government. source of the funding for the collection system and who controls it.Reviewers A key element of the operation budget program is the should also request budget documents, tracking of costs in order to have accurate records each summaries,or pie charts to learn more time the annual operating budget is developed. Having about the systems'budget. an annual baseline provides documentation for future budget considerations and provides justification for future rate increases. Collection system management should be aware of the procedures for calculating user rates and for recommending and making user rate changes. Collection system and wastewater treatment plant costs may be combined into one budget, or budget line items may be divided into each of two individual budgets. For example, electrical and mechanical maintenance work performed by plant staff on a pump station may be carried as an O&M cost in the treatment plant budget, although pumping stations are generally considered to be a collection system component. The cost of preventive and corrective maintenance and major collection system Examples of O&M Budget Items repairs and alterations are key items in the • Labor(usually at least 50%of total budget) annual operating budget. The collection • Utilities system owner or operator should keep • Capital adequate records of all maintenance costs, • Maintenance materials and supplies both in-house and contracted,plus the costs • Chemicals • Motor vehicles for spare parts. This will assist in the • Contracted services preparation of the following year's budget. In general,there should be an annual (12-month cycle)budget of discretionary and non- discretionary items. There may also be a Capital Improvement Plan (CIP)which may encompass small projects (one to two year cycles)or larger projects(three to five year cycles). Larger projects may include items such as equipment, labor,training, or root cause failure analysis. The major categories of operating costs are labor,utilities, and supplies. Cost accounting for 2-18 Page 646 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 29 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems these categories should include information on unit costs,total costs, and the amount and/or quantities used. The reviewer should evaluate the current and proposed budget, and current year balance sheets. In examining current and proposed expenditure levels,the reviewer should consider: • Whether the budgets include contributions to capital reserve (sinking) funds. These funds are savings for replacement of system components once they reach their service life. • Whether all income from water and sewer billings supports those functions, or if it goes into the general fund. • Whether raising user fees is a feasible option to meet budget needs based on recent expenditure history. 2.2.2 Monitoring The collection system owner or operator may be responsible for fulfilling some water quality or other monitoring requirements. Responsibilities may include: • Monitoring discharges into the collection system from industrial users • Monitoring to determine the effects of SSOs on receiving waters • Monitoring required as part of an NPDES permit, a 308 letter, administrative order, or consent decree The owner or operator should maintain written procedures to ensure that sampling is carried out in a safe, effective, and consistent manner. The procedures should specify, at a minimum the following: • Sampling location(s) • Sample volumes,preservatives, and holding times • Instructions for the operation of any automatic sampling and/or field monitoring (e.g.,pH or dissolved oxygen) equipment • Sampling frequency • Sampling and analytical methodologies • Laboratory QA/QC Records should be maintained of sampling events. These records should at a minimum include the following: • Date,time, and location of sampling • Sample parameters • Date shipped or delivered to the laboratory 2-19 Page 647 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 30 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems 2.2.3 Hydrogen Sulfide Monitoring and Control The collection system owner or operator should have a program under which they Areas Subject to Generation of monitor areas of the collection system which Hvdroeen Sulfide: may be vulnerable to the adverse effects of hydrogen sulfide. It may be possible to • Sewers with low velocity conditions and/or perform visual inspections of these areas. Thelong detention times records should note such items as the condition • Pu• Pummpp s deposis of metal components,the presence of exposed • Turbulent areas,such as drop manholes or rebar(metal reinforcement in concrete),copper force main discharge points sulfate coating on copper pipes and electrical • Inverted siphon discharges components, and loss of concrete from the pipe crown or walls. As mentioned in Section 2.4.2, the collection system owner or operator should be carrying out routine manhole inspections. The hydrogen sulfide readings generated as a result of these inspections should be added to the records of potential areas of corrosion. A quick check of the pH of the pipe Reviewer-Point to Note crown or structure enables early indication of potential The reviewer should be aware that a hydrogen sulfide corrosion. A pH of less than four system in which infiltration and inflow indicates further investigation is warranted. "Coupons" (I/I)has successfully been reduced may may be installed in structures or pipelines believed to be actually face an increased risk of corrosion.The reviewer should pay potentially subject to corrosion. Coupons are small particular attention to the hydrogen pieces of steel inserted into the area and measured sulfide monitoring program in these periodically to determine whether corrosion is occurring. systems. The reduction of flow through the pipes allows room for hydrogen sulfide gases to rise into the airway portion of the sewer pipe and react with the bacteria and moisture on the pipe walls to form sulfuric acid. Sulfuric acid corrodes ferrous metals and concrete. There are several methods to prevent or control hydrogen sulfide corrosion. The first is proper design. Design considerations are beyond the scope of this manual but may be found in the Design Manual: Odor and Corrosion Control in Sanitary Sewerage Systems and Treatment Plants (EPA 1985). The level of dissolved sulfide in the wastewater may also be reduced by chemical or physical means such as aeration, or the addition of chlorine,hydrogen peroxide, potassium permanganate, iron salts, or sodium hydroxide. Whenever chemical control agents are used,the owner or operator should have procedures for their application and maintain records of the dosages of the various chemicals. Alternatively, sewer cleaning to remove deposited solids reduces hydrogen sulfide generation. Also, air relief valves may be installed at the high points of the force main system. The valve allows air to exit thus avoiding air space at the crown of the pipe where acid can form. The reviewer should examine the records to see that these valves are 2-20 Page 648 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 31 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems receiving periodic maintenance. Collection systems vary widely in their vulnerability to hydrogen sulfide corrosion. Vitrified clay and plastic pipes are very resistant to hydrogen sulfide corrosion while concrete, steel, and iron pipes are more susceptible. The physical aspects of the collection system are also important. Sewage in pipes on a decline that moves the wastewater at a higher velocity will have less hydrogen sulfide than sewage in pipes where the wastewater may experience longer detention times. Therefore, some systems may need a more comprehensive corrosion control program while some might limit observations to vulnerable points. 2.2.4 Safety The reasons for development of a safety program should be obvious for any collection system owner or operator. The purpose of the program is to define the principles under which the work is to be accomplished,to make the employees aware of safe working procedures, and to establish and enforce specific regulations and procedures. The program Point to Note should be in writing (e.g., procedures,policies, and Although a safety program may not be training courses) and training should be well explicitly required under current documented. NPDES regulations,an excessive injury rate among personnel increases the likelihood of collection system The purpose of safety training is to stress the noncompliance with other importance of safety to employees. Safety training can requirements.Furthermore,when good be accomplished through the use of manuals, safety practices are not followed,there meetings,posters, and a safety suggestion program. may be a risk to the public or to One of the most common reasons for injury and collection system workers. fatalities in wastewater collection systems is the failure of victims to recognize hazards. Safety training cuts across all job descriptions and should emphasize the need to recognize and address hazardous situations. Safety programs should be in place for the following areas: • Confined spaces • Chemical handling • Trenching and excavations • Material Safety Data Sheets (MSDS) • Biological hazards in wastewater • Traffic control and work site safety • Lockout/Tagout • Electrical and mechanical safety • Pneumatic or hydraulic systems safety The collection system owner or operator should have written procedures which address all of the 2-21 Page 649 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 32 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems above issues and are made available to employees. In addition to training, safety programs should incorporate procedures to enforce the program. For example,this could include periodic tests or"pop" quizzes to monitor performance and/or compliance Reviewer-Point to Note and follow-up on safety related incidents. The reviewer should,in the course of interviewing personnel,determine their familiarity with health and safety The owner or operator should maintain all of the safety procedures according to their job equipment necessary for system staff to perform their description. daily activities and also undertake any emergency repairs. This equipment should include, at minimum: • Atmospheric gas testing equipment • Respirators and/or self-contained breathing apparatus • Full body harness • Tripods or non-entry rescue equipment • Hard hats • Safety glasses • Rubber boots • Rubber and/or disposable gloves • Antibacterial soap • First aid kit • Protective clothing • Confined space ventilation equipment • Traffic and/or public access control equipment • Hazardous gas meter Each field crew vehicle should have adequate health and safety supplies. If the reviewer has access to the municipal vehicle storage area, he or she might choose to check actual vehicle stocks,not just supplies in storage. 2.2.5 Emergency Preparedness and Response The collection system owner or operator should have a comprehensive plan in place for dealing with both routine and catastrophic � ; _ ' • emergencies. Routine emergencies include situations such as overflowing manholes, line breaks, localized electrical failure, and power - __ . outages at pump stations. Catastrophic = emergencies include floods,tornados, earthquakes, other natural events, serious SSOs can include overflows out of manholes onto city streets,sidewalks,and surrounding areas(photo:U.S. chemical spills, or widespread electrical EPA). 2-22 Page 650 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 33 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems failure. Ideally,this plan is written,reviewed, and adjusted as needed at periodic intervals. The reviewer should determine if the emergency response plan generally follows the guidelines described below. The location where the plan is housed may vary but, in general, such a document should be available in the yard office or other building commonly accessible to and frequented by collection system personnel. The emergency preparedness and response procedures may be contained in the collection system's O&M manual, or may be reflected in the descriptions of equipment and unit operations. Putting emergency procedures in a stand-alone document,rather than combining it with other information in the O&M manual, makes it easier for collection system personnel to find information. The plan should utilize the most current information on the collection system. For larger systems, a structured analysis, or risk assessment, should be made of the collection system, treatment plant, and the community. The risk assessment should identify areas where the collection system is vulnerable to failure and determine the effect and relative severity to collection systems operations, equipment and public safety, and health of such a failure. The risk assessment should concentrate on such factors as topography,weather, sewer system size, and other site-specific factors which reflect the unique characteristics of the system. Once the areas of vulnerability are known,the collection system owner or operator should have appropriate plans in place to ensure collection system operations continue for the duration of the emergency. The plans must clearly identify the steps staff should take in the event of emergency situations. Plans should include information on when it is appropriate to initiate and cease emergency operations. The plans should be very specific as to the collection system or repair equipment involved. Instructions should be available which explain how to operate equipment or systems during an emergency event when they are not functioning as intended but are not fully inoperable. The plan should also include specific procedures for reporting events that result in an overflow or other noncompliance event to the appropriate authorities. The owner or operator should track emergency situations to become better prepared for future emergencies and to assist with reporting and maintaining compliance with emergency-related requirements. Typical components of an emergency program may include: • General information regarding emergencies, such as telephone numbers of collection system personnel, fire department, and ambulance. • Identification of hazards (e.g.,chlorine storage areas) and use of universal classification system for hazards: combustible material, flammable liquids, energized electrical circuits, and hazardous materials. • Vulnerability analysis that identifies the various types of emergencies that could occur, such as natural disasters,power outages, or equipment failures. • Emergency response procedures. • Methods to reduce risk of emergencies. • Responsibilities of staff and management. 2-23 Page 651 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 34 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems • Continuous training. Procedures for emergency response plans should be understood and practiced by all personnel in order to ensure safety of the public and the collection system personnel responding. Procedures should be specific to the type of emergency that could occur. It is important to keep detailed records of all past emergencies in order to constantly improve response training, as well as the method and timing of future responses. The ability to deal with emergencies depends on the knowledge and skill of the responding crews, in addition to availability of equipment. The crew should be able to rapidly diagnose problems in the field under stress and select the right equipment needed to correct the problem. If resources are limited, consideration should be given to contracting other departments or private industries to respond to some emergency situations, for example,those rare emergencies that would exceed the capacity of staff. 2.2.6 Modeling Computer programs (modeling programs) are available that are capable of simulating the different flows within the collection system. The purpose of modeling is to determine system capacity requirements with respect to sewer design and structural conditions. Therefore the input of accurate data on sizes, location, elevation, and condition of sewer system components such as pipes, manholes, and pump stations-is necessary. When possible, flow monitoring data should be used to Reviewer-Point to Note calibrate the model. The reviewer should determine whether a model used by the owner or Modeling is also useful in examining effects before and operator: after rehabilitation. For example, models can be applied to "before" and "after" scenarios to estimate the effects • Has aadequate documentation such as of repairs. If a collection system is not experiencing any a user's manual that describes data capacity related issues(i.e., overflows,bypasses, input requirements,output to be basement backups, street flooding,hydraulic overload at expected,model capabilities and the treatment plant, etc.)then maintenance of a model limitations,and hardware may be optional for that system, although most medium and large systems should maintain a model of the larger diameter portion of their system. If any of the mentioned conditions are occurring then development and maintenance of a model is essential to performing a capacity assessment in the problem areas. Computer modeling is a specialized and complex subject. The reviewer may not have a comprehensive knowledge of modeling. If this is the case the he or she should obtain the following basic information: • Is the owner or operator using a model? • What areas of the collection system are being modeled and why? • What model (including the version) is being used?Who developed the model and when? • 2-24 Page 652 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 35 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems • How are the modeling results being used? 2.2.7 Mapping The importance of maintaining accurate, current maps of the collection system cannot be overstated. Efficient collection system maintenance and repairs are unlikely if mapping is not adequate. Collection system maps should clearly indicate the information that personnel need to carry out their assignments. The collection system maps should contain information on the following: • Main,trunk and interceptor sewers • Building/house laterals • Manholes • Cleanouts • Force mains • Pump stations • Service area boundaries • Other landmarks (roads, water bodies, etc.) Collection system maps should have a numbering system which uniquely identifies all manholes and sewer cleanouts. The system should be simple and easy to understand. Manholes and sewer cleanouts should have permanently assigned numbers and never be renumbered. Maps should also indicate the property served and reference its cleanout. Sewer line maps should indicate the diameter,the length between the centers of manholes, and the slope or direction of flow. The dimensions of easements and property lines should be included on the maps. Other information that should be included on maps are access and overflow points, a scale, and a north arrow. All maps should have the date the map was drafted and the date of the last revision. Although optional, maps often include materials of pipe construction. Maps may come in different sizes and scales to be used for different purposes. Detailed local maps may be used Key Design Characteristics by maintenance or repair crews to perform • Line locations,grades,depths,and capacities the duties. However,these detailed local • Maximum manhole spacing and size maps should be keyed to one overall map • Minimum pipe size that shows the entire system. • Pumping Station dimensions and capacities • Drop manholes • Flow velocities and calculations(peak flow and Geographic Information System (GIS) low-flow) technology have made the mapping and map • Accessibility features updating process considerably more • Other technical specifications(e.g.,materials, efficient. GIS is a computerized mapping equipment) program capable of combining mapping with detailed information about the physical 2-25 Page 653 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 36 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems structures within the collection system. If a GIS program is being used by the owner or operator, the reviewer should ask if the program is capable of accepting information from the owner or operator's management program. Specific procedures should be established for correction of errors and updating maps and drawings. Field personnel should be properly trained to recognize discrepancies between field conditions and map data and record changes necessary to correct the existing mapping system. Reviewers should check to see that maps and plans are available to the personnel in the office and to field personnel or contractors involved in all engineering endeavors. 2.2.8 New Construction The owner or operator should maintain strict control over the introduction of flows into the system from new construction. New construction maybe public (i.e., an expansion of the collection system)or private (i.e., a developer constructing sewers for a new development). Quality sanitary sewer designs keep costs and problems associated with operations,maintenance, and construction to a minimum. Design flaws are difficult to correct once construction is complete. The reviewer should be aware that this has historically not been adequately addressed in some collection systems. The owner or operator should have standards for new construction, procedures for reviewing designs and protocols for inspection, start-up, testing, and approval of new construction. The procedures should provide documentation of all activities, especially inspection. Reviewers should examine construction inspection records and be able to answer the following: • Does the volume of records seem reasonable given system size? • Do records reflect that the public works inspectors are complying with procedures? The state or other regulatory authority may also maintain standards for new construction. The standards held by the owner or operator should be at least as stringent. Start-up and testing should be in accordance with the manufacturers' recommendation where applicable and with recognized industry practices. Each step of the review, start-up,testing, and approval procedures should be documented. The owner or operator approval procedure should reflect future ease of maintenance concerns. After construction is complete, a procedure for construction testing and inspection should be used. Construction supervision should be provided by qualified personnel such as a registered professional engineer. 2.2.9 Pump Stations Proper operation, maintenance, and repair of pump stations typically requires special electrical, hydraulic, and mechanical knowledge. Pump station failure may damage equipment,the environment, or endanger public health. Variation in equipment types,pump station 2-26 Page 654 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 37 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems configuration, and geographical factors determine pump station design and O&M requirements. The reviewer should verify that the O&M manual contains procedures in writing for the following: • Are pumps rotated manually or automatically? If manually,how frequently? • Are wet well operating levels set to limit pump starts and stops? • Is there a procedure for manipulating pump operations (manually or automatically) during wet weather to increase in-line storage of wet weather flows? • Is flow monitoring provided?How is the data collected used? • Does the pump station have capacity-related overflows? Maintenance related overflows? Is overflow monitoring provided? • Is there a history of power outages? Is there a source of emergency power? If the emergency power source is a generator, is it regularly exercised under load? 2.3 Equipment and Collection System Maintenance Every collection system owner or operator should have a well-planned, systematic, and comprehensive maintenance program. The goals of a maintenance program should include: • Prevention of overflows • Maximization of service and system reliability at minimum cost • Assurance of infrastructure sustainability (i.e., ensure all components reach their service life) There should then be procedures which describe the maintenance approach for various systems. In addition,there should be detailed instructions for the maintenance and repair of individual facilities. These instructions should provide a level of detail such that any qualified collection system personnel or repair technician could perform the repair or maintenance activity. Maintenance may be planned or unplanned. There are essentially two types of planned maintenance;predictive and preventive. Predictive maintenance is a method that tries to look for early warning signs of equipment failure such that emergency maintenance is avoided. Preventive maintenance consists of scheduled maintenance activities performed on a regular basis. There are two types of unplanned maintenance, corrective and emergency. Corrective maintenance consists of scheduled repairs to problems identified under planned or predictive maintenance. Emergency maintenance are activities(typically repairs)performed in response to a serious equipment or line failure where action must be taken immediately. The goal of every owner or operator should be to reduce corrective and emergency maintenance through the use of planned and predictive maintenance. The reviewer should evaluate the progress of the owner or operator in achieving that goal. The goals of the reviewer in assessment of the maintenance program are: 2-27 Page 655 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 38 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems • Identify SSOs caused by inadequate maintenance • Determine maintenance trends (i.e., frequent emergency maintenance performed as opposed to predictive maintenance) • Identify sustainability issues (i.e., inadequate maintenance to allow system components to reach service life and/or many components nearing or at service life) 2.3.1 Maintenance Budgeting The cost of a maintenance program is a significant part of the annual operating budget. The collection system owner or operator should track all maintenance costs incurred throughout the year, both by internal staff and contractors,to ensure that the budget is based on representative costs from past years. Budgets should be developed from past cost records which usually are categorized according to preventive maintenance, corrective maintenance, and projected and actual major repair requirements. Annual costs should be compared to the budget periodically to control maintenance expenditures. The reviewer should evaluate the maintenance budget keeping in mind the system's characteristics, such as age. Costs for emergency repairs should be a relatively small percentage of the budget; five to ten percent would not be considered excessive. The establishment of an "emergency reserve" may also be included as part of the maintenance budget. This is especially useful where full replacement is not funded. The budget should also be considered in light of maintenance work order backlog. The labor budget should be evaluated for consistency with local pay rates and staffing needs and the reviewer should compare local pay rates and staffing needs according to the tables in Section 2.1.1. 2.3.2 Planned and Unplanned Maintenance A planned maintenance program is a systematic approach to performing maintenance activities so that equipment failure is avoided. Planned maintenance is composed of predictive and preventive maintenance. In the end, a good planned maintenance program should reduce material and capital repair and replacement costs, improve personnel utilization and morale,reduce SSOs, and sustain public confidence. Examples of predictive maintenance includes monitoring equipment for early warning signs of impending failure, such as excess vibration, heat, dirty oil, and leakage. Assessment and inspection activities can be classified as predictive maintenance. Vibration Reviewer-Point to Note and lubrication analyses,thermography, and ultrasonics The reviewer should inquire as to are among the more common predictive maintenance whether tools such as vibration and tools.Predictive maintenance also takes into account lubrication analysis,thermography,or historical information about the system as all systems ultrasonics are used,and obtain information on the extent of the will deteriorate over time. A predictive maintenance programs. program strives to identify potential problem areas and 2-28 Page 656 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 39 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems uncover trends that could affect equipment performance. Predictive maintenance offers an early warning. It allows collection system personnel to detect early signs of increasing rates of wear and therefore failure, and thus shift a"corrective"task into a"planned"task. To be truly effective predictive,however, maintenance should not spur personnel into doing the work too soon and wasting useful life and value of the equipment in question. The basis of a good predictive maintenance program is recordkeeping. Only with accurate recordkeeping can baseline conditions be established,problem areas identified, and a proactive approach taken to repairs and replacement. Effective preventive maintenance minimizes system costs and environmental impacts by reducing breakdowns and thus the need for corrective or emergency maintenance, improves reliability by minimizing the time equipment is out of service, increases the useful life of equipment thus avoiding costly premature replacement, and avoids potential noncompliance situations. An effective preventive maintenance program includes: • Trained personnel • Scheduling based on system specific knowledge • Detailed instructions related to the maintenance of various pieces of equipment • A system for recordkeeping • System knowledge in the form of maps, historical knowledge and records An effective preventive maintenance program builds on the inspection activities and Lubrication predictive maintenance described in Sections Lubrication is probably one of the most important 2.4.1 to 2.4.4, and includes a well thought-out maintenance activities for mechanical systems,such as schedule for these activities. pumps and motors.Frequency of lubrication,choice of lubricant and lubrication procedure are all important The basis of the schedule for mechanical factors in this activity. These items should closely follow manufacturer instructions,but may be modified equipment maintenance(i.e., pump station to fit site-specific conditions and particular equipment components) should be the manufacturers' applications. recommended activities and frequencies. This schedule may then be augmented by the knowledge and experience of collection system personnel to reflect the site-specific requirements. The schedule for sewer line cleaning, inspection,root removal, and repair activities should be based on periodic inspection data. In most systems, uniform frequencies for sewer line cleaning,inspection, and root removal are not necessary and inefficient. In many systems, a relatively small percentage of the pipe generates most of the problems. Efficient use of inspection data allows the owner or operator to implement a schedule in the most constructive manner. In rare cases it may be appropriate to reduce maintenance frequency for a particular piece of equipment. An example of a scheduling code and maintenance schedule for a pump is shown below: 2-29 Page 657 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 40 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems Rotary Pump Maintenance Schedule Frequency Maintenance Required D Check packing gland assembly D Check discharge pressure S Inspect and lubricate bearings A Flush bearings and replace lubricant D=Daily A=Annually S=Semiannually Typically, there is a maintenance card or record for each piece of equipment within the collection system. These records should contain maintenance recommendations, schedule, and instructions on conducting the specific maintenance activity. The records should include documentation regarding any maintenance activities conducted to date and other observations related to that piece of equipment or system. Maintenance records are generally kept'where maintenance personnel have easy access to them. The reviewer should examine the full series of periodic work orders(i.e.weekly,monthly, semiannually, and annually) for a selection of system components (e.g., a few pump stations, several line segments). The reviewer should then compare the recommended maintenance frequency to that which is actually performed. He or she should also look at the backlog of work;not focusing solely on the number of backlogged work orders,but on what that number represents in time. A very large system can have a hundred orders backlogged and only be one weekbehind. In a computerized system, a listing of all open work orders is usually very simple for collection system personnel to generate. The owner or operator should be able to explain their system for prioritizing work orders. The reviewer needs to clearly understand the following: • How the maintenance data management system works • How work orders are generated and distributed • How field crews use the work orders • How data from the field is collected and returned • How and on whose authority work orders are closed out The reviewer should check to see if data entry is timely and up to date. Unplanned maintenance is that which takes place in response to equipment breakdowns or emergencies.Unplanned maintenance may be corrective or emergency maintenance. Corrective maintenance could occur as a result of preventive or predictive maintenance activities which identified a problem situation. A work order should be issued so that the request for corrective maintenance is directed to the proper personnel. An example of non-emergency corrective maintenance could be a broken belt on a belt driven pump. The worn belt was not detected and 2-30 Page 658 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 41 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems replaced through preventive maintenance and therefore the pump is out of service until corrective maintenance can be performed. Although the pump station may function with one pump out of service, should another pump fail, the situation may become critical during peak flow periods. If the information can be easily generated the reviewer should select a sampling of work orders and compare them to the corrective maintenance database to determine if repairs are being made in a timely manner. Reviewers should note the current backlog of corrective maintenance work orders. A corrective maintenance backlog of two weeks or less would indicate an owner or operator in control of corrective maintenance. The owner or operator should be able to explain corrective maintenance work orders that have not been completed within six months. Corrective maintenance takes resources away from predictive and preventive maintenance. When corrective Types of Portable Emer2encv Equipment maintenance becomes a predominant • activity, personnel may not be able to Bypass pumps • Portable generator perform planned maintenance, thus • Air compressor,trailer-mounted leading to more corrective maintenance • Manhole lifters and gas testing equipment and emergency situations. Emergency • Sewer rodder and/or flushing machine maintenance occurs when a piece of • Portable lights and hand tools • Chemical spray units(for insects and rodent control) equipment or system fails, creating a Truck threat to public health,the • Vacuum-ton)and trailers Vacum truck environment, or associated equipment. • Repair equipment for excavation (backhoe, shoring This type of maintenance involves equipment, concrete mixers, gasoline operated saws, repairs, on short notice, of traffic control equipment,etc.) • malfunctioning equipment or sewers. A Confined space entry gear broken force main, totally non- functional pump station, and street cave-ins are all examples of emergency situations. Emergency crews should be geared to a 24-hour-a-day, year-round operation. Most large systems have staffed 24-hour crews; many small systems have an"on-call"system. The owner or operator should be able to produce written procedures which spell out the type of action to take in a particular type of emergency and the equipment and Reviewer-Point to Note personnel requirements necessary to carry out the The reviewer should note the presence of supplies during the review of the action. The crews should have copies of these yard where equipment and spare parts procedures and be familiar with them. Equipment must are maintained and personnel are be located in an easily accessible area and be ready to dispatched. move in a short period of time. Vehicles and equipment must be ready to perform, under extreme climatic conditions if necessary. The emergency crew 2-31 Page 659 of 1707 • Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 42 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems may need materials such as piping,pipe fittings,bedding materials and concrete. The owner or operator should have supplies on hand to allow for two point(i.e. segment, fitting, or appurtenance)repairs of any part of its system. Pump stations should be subject to inspection and preventive maintenance on a regular schedule. The frequency of inspection may vary from once a week, for a reliable pump station equipped with a telemetry system,to continuous staffing at a large pump station. The basic inspection should include verification that alarm systems are operating properly,wet well levels are properly set, all Owner or Operator -Point to Note indicator lights and voltage readings are within Occasionally a supervisor should acceptable limits, suction and discharge pressures are perform an unscheduled inspection to within normal limits, that the pumps are running without confirm that tasks have been performed excessive heat or vibration and have the required amount as expected. of lubrication, and that the emergency generator is ready if needed. Less frequent inspections may include such items as vibration analysis and internal inspection of pump components. Observations and tasks performed should be recorded in a log book or on a checklist at the pump station. It is important to note how this data returns to the central maintenance data management system. At the time of the inspection, collection system personnel may perform minor repairs if necessary. If non-emergency repairs are required that are beyond the staff's training, it will probably be necessary to prepare a work order which routs a request though the proper channels to initiate the repair action. During the review the reviewer should check a random number of work orders to see how they move through the system. The reviewer should note whether repairs are being carried out promptly. In pump stations, for critical equipment(pumps, drives,power equipment, and control equipment),there should not be much backlog, unless the staff is waiting for parts. During the review,the reviewer should also make on-site observations of a representative pump stations. The reviewer should plan at least half an hour to look at the simplest two-pump prefabricated station, and one to two hours to look at a larger station. In large systems, drive time between stations may be significant. The reviewer should strive to see a range of pump station sizes and types (i.e.,the largest, smallest,most remote and any that review of work orders has indicated might be problematic). Overall,the pump station should be clean, in good structural condition and exhibit minimal odor. The reviewer should note the settings of the pumps (i.e.,which are operating, which are on stand-by, and which are not operating and why). The operating pumps should be observed for noise,heat, and excessive vibration. The settings in the wet well should be noted(as indicated on the controls, as direct observation of the reviewer in the wet well is not recommended) and the presence of any flashing alarm lights. The reviewer is reminded of the atmospheric hazards in a pump station(make sure ventilation has been running prior to arrival)and to avoid confined 2-32 Page 660 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 43 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems space entry. If the pump station has an overflow its outlet should be observed, if possible, for signs of any recent overflows such as floatable materials or toilet paper. The reviewer should check the log book and/or checklist kept at the pump station to ensure that records are current and all maintenance activitieshave been performed. Below is a listing of items that indicate inadequate maintenance: • Overall poor housekeeping and cleanliness • Excessive grease accumulation in wet well • Excessive corrosion on railings, ladders, and other metal components • Sagging, worn, improperly sized, or inadequate belts • Excessive equipment out of service for repair or any equipment for which repair has not been ordered(i.e., a work order issued) • Pumps running with excessive heat,vibration,or noise • Peeling paint and/or dirty equipment(the care given to equipment's outer surfaces often, but not always, mirrors internal condition) • Check valves not closing when pumps shut off • Inoperative instrumentation, alarms, and recording equipment • "Jury-rigged"repairs (i.e., "temporary"repairs using inappropriate materials) • Leakage from pumps, piping, or valves (some types of pump seals are designed to "leak" seal water) • Inadequate lighting or ineffective/inoperative ventilation equipment 2.3.3 Sewer Cleaning The purpose of sewer cleaning is to remove accumulated material from the sewer. Cleaning helps to prevent blockages and is also used to prepare the sewer for inspections. Stoppages in gravity sewers are usually caused by a structural defect, Results of Various Flow Velocities poor design,poor construction, an accumulation of material in Velocity Result the pipe(especially grease), or 2.0 ft/sec Very little material buildup in pipe root intrusion. Protruding traps 1.4-2.0 ft/sec Heavier grit(sand and gravel)begin (lateral sewer connections to accumulate incorrectly installed so that they 1.0-1.4 ft/sec Inorganic grit and solids accumulate protrude into the main sewer) Below 1.0 ft/sec Significant amounts of organic and inorganic solids accumulate may catch debris which then (EPA 1974) causes a further buildup of solids that eventually block the sewer. If the flow is less than approximately 1.0 to 1.4 feet per second,grit and solids can accumulate leading to a potential blockage. There are three major methods of sewer cleaning: hydraulic,mechanical, and chemical. 2-33 Page 661 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 44 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems Hydraulic cleaning(also referred to as flushing)refers to any application of water to clean the pipe. Mechanical cleaning uses physical devices to scrape, cut, or pull material from the sewer. Chemical cleaning can facilitate the control of odors, grease buildup, root growth, corrosion, and insect and rodent infestation. For additional Sewer Cleaning Records information on sewer cleaning methods refer to Volumes I and II of Operation and • Date,time,and location of stoppage or Maintenance of Wastewater Collection Systems routine cleaning activity (CSU Sacramento 1996 and 1998). • Method of cleaning used • Cause of stoppage • Identity of cleaning crew The backbone of an effective sewer cleaning • Further actions necessary and/or initiated program is accurate recordkeeping. Accurate • Weather conditions recordkeeping provides the collection system owner or operator with information on the areas of the collection system susceptible to stoppages such - that all portions of the system can be on an appropriate 4.• 2,4,7 schedule. The reviewer should examine the records for ,, . ;_ �''''� legibility and completeness. He or she should then _ ' review the database to determine if entry of the field :'�=-=fes" r—; notes is current and accurate. • • Sewers vary widely in their need for preventive `' cleaning. The collection system in a restaurant district may require cleaning every six months in order to prevent grease blockages. An area of the sewer system It with new PVC piping and no significant grease contribution with reasonable and consistent slopes (i.e., no sags)may be able to go five years with no problems. Root and grease buildup can cause blockages in a The owner or operator should be able to identify sewer system[photo:North Carolina Department of Natural Research(NCDNR)]. problem collection system areas,preferably on a map. Potential problem areas identified should include those due to grease or industrial discharges,hydraulic bottlenecks in the collection system, areas of poor design(e.g., insufficiently sloped sewers), areas prone to root intrusion, sags, and displacements. The connection between problem areas in the collection system and the preventive maintenance cleaning schedule should be clear. The owner or operator should also be able to identify the number of stoppages experienced per mile of sewer pipe. If the system is experiencing a steady increase in stoppages,the reviewer should try to determine the cause(i.e., lack of preventive maintenance funding, deterioration of the sewers due to age, an increase in grease producing activities, etc). 2-34 Page 662 of 1707 •I Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 45 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems 2.3.4 Parts and Equipment Inventory An inventory of spare parts, equipment, and supplies should be maintained by the collection system owner or operator. The inventory should be based on equipment manufacturer's recommendations, supplemented by historical experience with maintenance and equipment problems. Without such an inventory,the collection system may experience long down times or periods of inefficient operation in the event of a breakdown or malfunction. Files should be maintained on all pieces of equipment and major tools. The owner or Basic Equipment Inventory operator should have a system to assure that • Type,age,and description of the equipment each crew always has adequate tools. Tools • Manufacturer should be subject to sign out procedures to • Fuel type and other special requirements provide accountability. Tools and equipment • Operating costs and repair history should be replaced at the end of their useful life. The reviewer should inquire as to how this is determined and how funds are made available to ensure this is the case. In addition,the reviewer should look at the tools and note their condition. The owner or operator should maintain a yard where equipment, supplies, and spare parts are maintained and personnel are dispatched. Very large systems may maintain more than one yard. In this case, the reviewer should perform a visual survey at the main yard. In small to medium size systems, collection system operations may share the yard with the department of public works,water department, or other municipal agencies. In this case the reviewer should determine what percentage is being allotted for collection system items. The most important features of the yard are convenience and accessibility. The reviewer should observe a random sampling of inspection and maintenance crew vehicles for equipment as described above. A review of the equipment and manufacturer's manuals aids in determining what spare parts should be maintained. The owner or operator should then consider the frequency of usage of the part,how critical the part is, and finally how difficult the part is to obtain when determining how many of the part to keep in stock. Spare parts should be kept in a clean, well-protected stock room. Owner or Operator-Point to Note Critical parts are those which are essential to The owner or operator should have a procedure for the operation of the collection system. Similar determining which spare parts are critical. to equipment and tools management, a tracking system should be in place, including procedures on logging out materials, when maintenance personnel must use them. The owner or operator should be able to produce the spare parts inventory and clearly identify those parts deemed critical. The reviewer should evaluate the inventory and selected items in the stockroom to determine whether the specified number of these parts are being maintained. 2-35 Page 663 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 46 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems 2.4 Sewer System Capacity Evaluation -Testing and Inspection The collection system owner or operator should have a program in place to periodically evaluate the capacity of the sewer system in both wet and dry weather flows and ensure the capacity is maintained as it was designed. The capacity evaluation program builds upon ongoing activities and the everyday preventive maintenance that takes place in a system. The capacity evaluation begins with an inventory and characterization of the system components. The inventory should include the following basic information about the system: • Population served • Total system size(feet or miles) • Inventory of pipe length, size,material and age, and interior and exterior condition as available • Inventory of appurtenances such as bypasses, siphons, diversions,pump stations,tide or flood gates and manholes, etc., including size or capacity,material and age, and condition as available • Force main locations, length, size and materials, and condition as available • Pipe slopes and inverts • Location of house laterals -both upper and lower The system then undergoes general inspection (described below in Sections 2.4.1 to 2.4.4)which serves to continuously update and add to the inventory information. The next step in the capacity evaluation is to identify the location of wet weather related SSOs, surcharged lines,basement backups, and any other areas of known capacity limitations. These areas warrant further investigation in the form of flow and rainfall monitoring and inspection procedures to identify and r '� quantify the problem. The reviewer should s' ;; ' determine that the capacity evaluation • includes an estimate peak flows experienced , - in the system, an estimate of the capacity of key system components, and identifies the major sources of I/I that contribute to hydraulic overloading events. The capacity — _ -— _ _ evaluation should also make use of a hydraulic model, if any,to identify areas A sewer inspection is an important part of a sewer system capacity evaluation(photo:N.J.Department of with hydraulic limitations and evaluate Environmental Protection). alternatives to alleviate capacity limitations. Short and long term alternatives to address hydraulic deficiencies should be identified,prioritized, and scheduled for implementation. 2-36 Page 664 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 47 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems 2.4.1 Flow Monitoring Fundamental information about the collection system is obtained by flow monitoring. Flow monitoring provides information on dry weather flows as well as areas of the collection system potentially affected by I/I. Flow measurement may also be performed for billing purposes, to assess the need for new sewers in a certain area, or to calibrate a model. There are three techniques commonly used for monitoring flow rates: (1)permanent and long-term, (2) temporary, and (3) instantaneous. Permanent installations are done at key points in the collection system such as the discharge point of a satellite collection system,pump stations, and key junctions. Temporary monitoring consists of flow meters typically installed for 30-90 days. Instantaneous flow metering is performed by collection system personnel, one reading is taken and then the measuring device is removed. The collection system owner or operator should have a flow monitoring plan that describes their flow monitoring strategy or should at least be able to provide the following information: • Purpose of the flow monitoring • Location of all flow meters • Type of flow meters • Flow meter inspection and calibration frequency A flow monitoring plan should provide for routine inspection, service, and calibration checks (as opposed to actual calibration). In some cases,the data is calibrated rather than the flow meter. Checks should include taking independent water level (and ideally velocity readings), cleaning accumulated debris and silt from the flow meter area, downloading data(sometimes only once per month), and checking the desiccant and battery state. Records of each inspection should be maintained. Flow measurements performed for the purpose of quantifying I/I are typically separated into three components: base flow, infiltration, and inflow. Base flow is generally taken to mean the wastewater generated without any I/I component. Infiltration is the seepage of groundwater into pipes or manholes through defects such as cracks,broken joints,etc. Inflow is the water which enters the sewer through direct connections such as roof leaders, direct connections from storm drains or yard, area, and foundation drains,the holes in and around the rim of manhole covers, etc. Many collection system owners or operators add a third classification: rainfall induced infiltration(RII). RII is stormwater that enters the collection system through defects that lie so close to the ground surface that they are easily reached.Although not from piped sources, RII tends to act more like inflow than infiltration. In addition to the use of flow meters,which may be expensive for a small owner or operator, other methods of inspecting flows may be employed such as visually monitoring manholes during low-flow periods to determine areas with excessive I/I. For a very small system, this technique may be an effective and low lcost means of identifying problem areas in the system which require further investigation. 2-37 Page 665 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 48 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems The owner or operator should have in place a program for the efficient identification of excessive I/I. The program should look at the wastewater treatment plant,pump stations, permanent meter flows, and rainfall data to characterize peaking factors for the whole system and major drainage basins. The reviewer should evaluate the program including procedures and records associated with the flow monitoring plan. Temporary meters should be used on a "roving"basis to identify areas with high wet weather flows. Areas with high wet weather flows should then be subject to inspection and rehabilitation activities. 2.4.2 Sewer System Testing Sewer system testing techniques are often used to identify leaks which allow unwanted infiltration into the sewer system and determine the location of illicit connections and other sources of stormwater inflow. Two commonly implemented techniques include smoke testing and dyed water testing. Regardless of the program(s)implemented by the owner or operator, the reviewer should evaluate any procedures and records that have been established for these programs. The reviewer should also evaluate any public relations program and assess how the owner or operator communicates with the public during these tests (i.e.,when there is a possibility of smoke entering a home or building). Smoke testing is a relatively inexpensive and quick method of detecting sources of inflow in sewer Areas Usually Smoke Tested systems, such as down spouts, or driveway and yard drains and works best suited for detecting cross Drainage paths connections andpoint source inflow leaks. Smoke • Ponding areas Roof leaders testing is not typically used on a routine basis,but • Cellars rather when evidence of excessive I/I already • Yard and area drains exists. With each end of the sewer of interest • Fountain drains • plugged, smoke is introduced into the test section, Abandoned building sewers • usually via a manhole. Sources of inflow can then Faulty service connections be identified when smoke escapes through them. If the collection system owner or operator implements a regular program of smoke testing,the program should include a public notification procedure. The owner or operator should also have procedures to define: • How line segments are isolated • The maximum amount of line to be smoked at one time • The weather conditions in which smoke testing is conducted(i.e.,no rain or snow, little wind and daylight only) The results of positive smoke tests should be documented with carefully labeled photographs. Building inspections are sometimes conducted as part of a smoke testing program and, in some cases, may be the only way to find illegal connections. If properly connected to the sanitary sewer system, smoke should exit the vent stacks of the surrounding properties. If traces of the 2-38 Page 666 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 49 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems smoke or its odor enter the building, it is an indication that gases from the sewer system may also be entering. Building inspections can be labor intensive and require advanced preparation and communication with the public. Dyed water testing may be used to establish the connection of a fixture or appurtenance to the sewer. It is often used to confirm smoke testing or to test fixtures that did not smoke. As is the case with smoke testing, it is not used on a routine basis but rather in areas that have displayed high wet weather flows. Dyed water testing can be used to identify structurally damaged manholes that might create potential I/I problems. This is accomplished by flooding the area close to the suspected manholes with dyed water and checking for entry of dyed water at the frame-chimney area, cone/corbel, and walls of the manhole. 2.4.3 Sewer System Inspection Visual inspection of manholes and pipelines are the first line of defense in the identification of existing or potential problem areas. Visual inspections should take place on both a scheduled basis and as part of any preventive or corrective maintenance activity. Visual inspections provide additional information concerning the accuracy of system mapping, the presence and degree of I/I problems, and the physical state-of-repair of the system. By observing the manhole directly and the incoming and outgoing lines with a mirror, it is possible to determine structural condition, the presence of roots, condition of joints, depth of debris in the line, and depth of flow. The reviewer should examine the 'r; •records of visual inspections to ensure that ' ' ' t the following information is recorded 4:c ieftarl • Manhole identification number and location , • Cracks or breaks in the manhole or pipe(inspection sheets and/or logs r c • should record details on defects) • Accumulations of grease,debris, or grit • • Wastewater flow characteristics (e.g., flowing freely or backed up) • Inflow • Infiltration (presence of clear water in '. or flowing through the manhole) - - • Presence of corrosion Damage to t e sewer system in astructure,suc as • Offsets or misalignments this broken manhole cover allows stormwater into the • Condition of the frame sewer system(photo:Limno-Tech,Inc.) • Evidence of surcharge • Atmospheric hazard measurements (especially hydrogen sulfide) • If repair is necessary, a notation as to whether a work order has been issued 2-39 Page 667 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 50 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems Manholes should undergo routine inspection typically every one to five years. There should be a baseline for manhole inspections (e.g., once every two years)with problematic manholes being inspected more frequently. The reviewer should conduct visual observation at a small but representative number of manholes for the items listed above. There are various pipeline inspection techniques, the most common include: lamping, camera inspection, sonar, and CCTV. These will be explained further in the following sections. 24.3.1 Sewer System Inspection Techniques Sewer inspection is an important component of any maintenance program. There are a number of inspection techniques that may be employed to inspect a sewer system. The reviewer should determine if a inspection program includes frequency and schedule of inspections and procedures to record the results. Sewer system cleaning should always be considered before inspection is performed in order to provide adequate clearance and inspection results. Additionally, a reviewer should evaluate records maintained for inspection activities including if information is maintained on standardized logs and should include: • Location and identification of line being inspected • Pipe size and type • Name of personnel performing inspection • Distance inspected • Cleanliness of the line • Condition of the manhole with pipe defects identified by footage from the starting manhole • Results of inspection, including estimates of I/I Lamping involves lowering a still camera into a manhole. The camera is lined up with the centerline of the junction of the manhole frame and sewer. A picture is the taken down the pipe with a strobe-like flash. A disadvantage of this technique is that only the first 10-12 feet of the pipe can be inspected upstream and downstream of the access point. Additionally, it has limited use in small diameter sewers. The benefits of this technique include not requiring confined space entry and little equipment and set-up time is required. Camera inspection is more comprehensive then lamping in that more of the sewer can be viewed. A still camera is mounted on a floatable raft and released into a pipe. The camera takes pictures with a strobe-like flash as it floats through the sewer pipe. This technique is often employed in larger lines where access points are far apart. Similarly to lamping,portions of the pipe may still be missed using this technique. Obviously,there also must be flow in the pipe for the raft to float. This technique also does not fully capture the invert of the pipe and its condition. Sonar is a newer technology deployed similarly to CCTV cameras, described in more detail below. The sonar emits a pulse which bounces off the walls of the sewer. The time it takes for 2-40 Page 668 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 51 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems this pulse to bounce back provides data providing an image of the interior of the pipe including its structural condition. A benefit of this technique is that it can be used in flooded or inaccessible sections of the sewer. The drawback is that the technique requires heavy and expensive equipment. Sewer scanner and evaluation is an experimental technology where a 360 degree scanner produces a full digital picture of the interior of the pipe. This technique is similar to sonar in that a more complete image of a pipe can be made than with CCTV, but not all types of sewer defects may be identified as readily(i.e., infiltration, corrosion). Closed Circuit Television (CCTV) inspections are a helpful tool for early detection of potential problems. This technique involves a closed-circuit camera with a light which is self-propelled or pulled down the pipe. As it moves it records the interior of the pipe. CCTV inspections may be done on a routine basis as part of the preventive maintenance program as well as part of an investigation into the cause of I/I. CCTV,however, eliminates the hazards associated with confined space entry. The output is displayed on a monitor and videotaped. A benefit of CCTV inspection is that a permanent visual record is captured for subsequent reviews. 2.5 Sewer System Rehabilitation The collection system owner or operator should have a sewer rehabilitation program. The objective of sewer rehabilitation is to maintain the overall viability of a collection system. This is done in three ways: (1) ensuring its structural integrity; (2)limiting the loss of conveyance and wastewater treatment capacity due to excessive 1/I; and(3) limiting the potential for groundwater contamination by controlling exfiltration from the pipe network. The rehabilitation program should build on information obtained as a result of all forms of maintenance and observations made as part of the capacity evaluation and asset inventory to assure the continued ability of the system to provide sales and service at the least cost. The reviewer should try to gain a sense of how rehabilitation is prioritorized. Priorities may be stated in the written program or may be determined through interviews with system personnel. There are many rehabilitation methods. The choice of methods depends on pipe size,type, location, dimensional changes, sewer flow,material deposition, surface conditions, severity of I/I, and other physical factors.Non-structural repairs typically involve the sealing of leaking joints in otherwise sound pipe. Structural repairs involve either the replacement of all or a portion of a sewer line, or the lining of the sewer. These repairs can be carried out by excavating usually for repairs limited to one or two pipe segments (these are known as point repairs) or by trenchless technologies(in which repair is carried out via existing manholes or a limited number of access excavations). The rehabilitation program should identify the methods that have been used in the past, their success rating and methods to be used in the future. An reviewer who wants further guidance on methods of rehabilitation may consult: 2-41 Page 669 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 52 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems • Technology Description from 2004 Report to Congress (EPA 2004) • Operation and Maintenance of Wastewater Collection Systems, Volumes I and II(CSU Sacramento 1996 and 1998) • Existing Sewer Evaluation and Rehabilitation (WEF 1994) i AR The reviewer should determine the owner's or operator's policies regarding service lateral111:1 rehabilitation since service laterals can constitute a serious source of I/I. Manholes 111111.1011 should not be neglected in the rehabilitation program. Manhole covers can allow significant inflow to enter the system because they are often located in the path of surface runoff. Manholes themselves can also be a significant source of infiltration from cracks in the barrel of the manhole. The owner or operator should be able to produce documentation on the location and methods used for sewer rehabilitation. The reviewer should compare the rehabilitation accomplished with that recommended by the capacity evaluation program. When examining the collection system rehabilitation program,the reviewer should be able to answer the following questions: • Is rehabilitation taking place before it becomes emergency maintenance? • Are recommendations made as a result of the previously described inspections? • Does the rehabilitation program take into account the age and condition of the sewers? 2-42 Page 670 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 53 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems CHAPTER 3. CHECKLIST FOR CONDUCTING EVALUATIONS OF WASTEWATER COLLECTION SYSTEM CAPACITY, MANAGEMENT, OPERATION, AND MAINTENANCE (CMOM) PROGRAMS The following is a comprehensive checklist available for use in the review process. The checklist consists of a series of questions organized by major categories and sub-categories. The major category is followed by a brief statement describing the category. Following the sub-category is a brief clarifying statement. References are then given. Questions are provided in a table format that includes the question,response, and documentation available. Response is completed by using information and data acquired from the data and information request, onsite interviews, and site reviews. An alternative to this process is to transmit the entire checklist to the collection system owner or operator to complete and return electronically. 3-1 Page 671 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 54 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems Table of Contents I. General Information - Collection System Description 3-4 II. Continuing Sewer Assessment Plan 3-5 III. Collection System Management 3-6 A. Organizational Structure 3-6 B. Training 3-7 C. Communication and Customer Service 3-8 D. Management Information Systems 3-10 E. SSO Notification Program 3-11 F. Legal Authority 3-12 IV. Collection System Operation 3-14 A. Budgeting 3-14 B. Compliance 3-16 C. Water Quality Monitoring 3-17 D. Hydrogen Sulfide Monitoring and Control 3-18 E. Safety 3-19 F. Emergency Preparedness and Response 3-21 G. Modeling 3-23 H. Engineering - System Mapping and As-built Plans (Record Drawings) 3-24 I. Engineering-Design 3-25 J. Engineering- Capacity 3-26 K. Engineering- Construction 3-27 L. Pump Station Operation 3-28 1. Pump Stations -Inspection 3-29 2. Pump Stations -Emergencies 3-30 3. Pump Stations -Emergency Response and Monitoring 3-31 4. Pump Stations -Recordkeeping 3-32 5. Pump Stations -Force Mains and Air/Vacuum Valves 3-33 V. Collection System Maintenance 3-34 A. Maintenance Budgeting 3-34 B. Planned Maintenance 3-35 C. Maintenance Scheduling 3-36 D. Maintenance Right-of-Way 3-37 E. Sewer Cleaning 3-38 1. Sewer Cleaning-Cleaning Equipment 3-39 2. Sewer Cleaning-Chemical Cleaning and Root Removal 3-40 F. Parts Inventory 3-41 G. Equipment and Tools Management 3-42 VI. Management Information Systems: Performance Indicators 3-43 VII. Sewer System Capacity Evaluation(SSES) 3-45 A. Internal TV Inspection 3-45 B. Survey and Rehabilitation(general) 3-46 C. Sewer Cleaning Related to I/I Reduction 3-47 D. Flow Monitoring 3-48 E. Smoke Testing and Dyed Water Flooding 3-49 3-2 Page 672 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 55 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems F. Manhole Inspection 3-50 VIII. Rehabilitation 3-52 A. Manhole Repairs 3-52 B. Mainline Sewers 3-53 3-3 Page 673 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 56 of 126 Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems I. General Information - Collection System Description Question Response Documentation Available Yes No Size of service area(acres). Population of service area. Number of pump stations. Feet(or miles)of sewer. Age of system(e.g.,30%over 30 years,20%over 50 years,etc.). Comments: 3-4 Page 674 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 57 of 126 II. Continuing Sewer Assessment Plan Question Response Documentation Available Yes No Does the collection system experience problems related to I/I? How do these problems manifest themselves? (Manhole overflows, basement flooding,structure,SSOs) How does the owner or operator prioritize investigation,repairs and rehabilitation related to I/I? What methods are considered to remedy hydraulic deficiencies? Does the plan include a schedule for investigative activities? Is the plan regularly updated? Comments: 3-5 Page 675 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 58 of 126 III. A. Collection System Management: Organizational Structure Question Response Documentation Available Yes No Is an organizational chart available that shows the overall personnel structure for the collection system,including operation and maintenance staff? Are there organizational charts that show functional groups and classifications? Are up to date job descriptions available that delineate responsibilities and authority for each position? Are the following items discussed in the job descriptions: 0 nature of work to be performed,❑minimum requirements for the position, 0 necessary special qualifications or certifications, 0 examples of the types of work, 0 list of licences required for the position, ❑ performance measures or promotional potential? Does the organizational chart indicate how many positions are budgeted as opposed to actually filled? On average,how long do positions remain vacant? Are collection system staff responsible for any other duties,(e.g., road repair or maintenance,O&M of the storm water collection system)? Comments: 3-6 Page 676 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 59 of 126 III. B. Collection System Management: Training Question Response Documentation Available Yes No Is there a documented formal training program? Does the training program address the fundamental mission,goals, and policies of the collection system owner or operator? Does the owner or operator provide training in the following areas: ❑safety, ❑routine line maintenance,❑confined space entry, ❑traffic control,❑record keeping,❑electrical and instrumentation, ❑pipe repair,❑bursting CIPP,❑public relations, ❑SSO/emergency response,❑pump station operations and maintenance,❑CCTV and trench/shoring,❑other? Which of these programs have formal curriculums? Does On-the-Job(OJT)training use Standard Operating and Standard Maintenance Procedures(SOPs&SMPs)? Is OJT progress and performance measured? Does the owner or operator have mandatory training requirements identified for key employees? What percentage of employees met or exceeded their annual training goals during the past year? Which of the following methods are used to assess the effectiveness of the training: 0 periodic testing, ❑drills,❑ demonstration, ❑none? What percentage of the training offered by the owner or operator is in the form of the following: manufacturer training,on-the-job training,in-house classroom training,industry-wide training? Comments: 3-7 Page 677 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 60 of 126 III. C. Collection System Management: Communication and Customer Service Question Response Documentation Available Yes No What type of public education/outreach programs does the owner or operator have about user rates? Do these programs include communication with groups such as local governments,community groups,the media,schools,youth organizations,senior citizens?List applicable groups. Is there a public relations program in place? Are the employees of the collection system trained in public relations? Are there sample correspondence or"scripts"to help guide staff through written or oral responses to customers? What methods are used to notify the public of major construction or maintenance work: ❑door hangers,El newspaper,❑fliers,❑ signs,❑other, ❑none? Is the homeowner notified prior to construction that his/her property may be affected? Is information provided to residents on cleanup procedures following basement backups and overflows from manholes when they occur? Which of the following methods are used to communicate with system staff: ❑regular meetings,0 bulletin boards,❑e-mail,❑ other? How often are staff meetings held(e.g.,daily,weekly,monthly)? Are incentives offered to employees for performance improvements? Does the owner or operator have an"Employee of the Month/Quarter/Year"program? 3-8 Page 678 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 61 of 12A Question Response Documentation Available Yes No How often are performance reviews conducted(e.g.,semi-annually, annually,etc.)? Does the owner or operator regularly communicate with other municipal departments? Does the owner or operator have a formal procedure in place to evaluate and respond to complaints? What are the common complaints received? Does the owner or operator have a process for customer evaluation of the services provided? Do customer service records include the following information: 0 personnel who received the complaint or request, ❑nature of complaint or request,0 to whom the follow-up action was assigned, ❑date of the complaint or request,❑date the complaint or request was resolved,0 customer contact information,❑location of the problem, ❑date the follow-up action was assigned,❑cause of the problem,❑ feedback to customer? Does the owner or operator have a goal for how quickly customer complaints(or emergency calls)are resolved? What percentage of customer complaints(or emergency calls)are resolved within the timeline goals? How are complaint records maintained? (i.e.,computerized)Is this information used as the basis for other activities such as routine preventative maintenance? Comments: 3-9 Page 679 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 62 of 126 III. D. Collection System Management: Management Information Systems Question Response Documentation Available Yes No What types of work reports are prepared by the O&M Staff? Do the work reports include enough information?(See example report forms) How are records kept? Are records maintained for a period of at least three years? Are the records able to distinguish activities taken in response to an overflow event? Does the owner or operator use computer technology for its management information system?(Computer Based Maintenance Management Systems,spreadsheets,data bases,SCADA,etc).If so, what type of system(s)is used? Are there written instructions for managing and tracking the following information: ❑complaint work orders, ❑scheduled work orders,❑customer service,❑ scheduled preventative maintenance, ❑ scheduled inspections,❑sewer system inventory, ❑safety incidents,❑scheduled monitoring/sampling, 0 compliance/overflow tracking,❑equipment/tools tracking, ❑parts inventory? Do the written instructions for tracking procedures include the following information: ❑ accessing data and information,❑ instructions for using the tracking system,❑updating the MIS, ❑developing and printing reports? How often is the management information system updated (immediately,within one week of the incident,monthly as time permits)? Comments: 3-10 Page 680 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 63 of 126 III. E. Collection System Management: SSO Notification Program • Question Response Documentation Available Yes No Does the owner or operator have standard procedures for notifying state agencies,health agencies,the regulatory authority,and the drinking water purveyor of overflow events? Are above notification procedures dependent on the size or location of the overflow? If so,describe this procedure. Is there a Standard form for recording overflow events? Does it include location,type,receiving water,estimated volume,cause? Are chronic SSO locations posted? Comments: 3-11 Page 681 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 64 of 126 III. F. Collection System Management: Legal Authority Question Response Documentation Available Yes No Does the collection system receive flow from satellite communities? What is the total area from satellite communities that contribute flow to the collection system(acres or square miles)? Does the owner or operator require satellite communities to enter into an agreement? Does the agreement include the requirements listed in the sewer use ordinance(SUO)? Do the agreements have a date of termination and allow for renewal under different terms? Does the owner or operator maintain the legal authority to control the maximum flow introduced into the collection system from satellite communities? Are standards,inspections,and approval for new connections clearly documented in a SUO? Does the SUO require satellite communities to adopt the same industrial and commercial regulator discharge limits as the owner or operator? Does the SUO require satellite communities to adopt the same inspection and sampling schedules as required by the pretreatment ordinance? Does the SUO require the satellite communities or the owner or operator to issue control permits for significant industrial users? Does the SUO contain provisions for addressing overstrength wastewater from satellite communities? Does the SUO contain procedures for the following:inspection standards,pretreatment requirements,building/sewer permit issues? 3-12 Page 682 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 65 of 126 Does the SUO contain general prohibitions of the following materials: ❑fire and explosion hazards,❑oils or petroleum,❑ corrosive materials, El materials which may cause interference at the wastewater treatment plant,El obstructive materials? Does the SUO contain procedures and enforcement actions for the following: El fats,oils,and grease(FOG);0 I/I;building structures over the sewer lines;El storm water connections to sanitary lines; ❑ defects in service laterals located on private property;❑sump pumps,air conditioner? Comments: 3-13 Page 683 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 66 of 126 IV. A. Collection System Operation: Budgeting Question Response Documentation Available Yes No What are the owner or operator's current rates? What is the average annual fee for residential users? How are user rates calculated? How often are user charges evaluated and adjusted based on that evaluation? How many rate changes have there been in the last 10 years and what were they? Does the owner or operator receive sufficient funding from its revenues? Are collection system enterprise funds used for non-enterprise fund activities? Is there a budget for annual operating costs? Does the budget provide sufficient line item detail for labor,materials and equipment? Are costs for collection system O&M separated from other utility services,i.e.,water, storm water and treatment plants? Do O&M managers have current O&M budget data? What is the collection system's average annual O&M budget? What percentage of the collection system's overall budget is allocated to maintenance of the collection system? Does the owner or operator have a Capital Improvement Plan(CIP) that provides for system repair/replacement on a prioritized basis? What is the collection system's average annual CIP budget? 3-14 Page 684 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 67 of 1 2A Question Response Documentation Available Yes No What percentage of the maintenance budget is allotted to the following maintenance:Predictive maintenance(tracking design, life span,and scheduled parts replacement),preventative maintenance (identifying and fixing system weakness which,if left unaddressed, could lead to overflows),corrective maintenance(fixing system components that are functioning but not at 100%capacity/efficiency), emergency maintenance(reactive maintenance,overflows,equipment breakdowns). Does the owner or operator have a budgeted program for the replacement of under-capacity pipes? Does the owner or operator have a budgeted program for the replacement of over-capacity pipes? Are O&M staff involved in O&M budget preparation? How are priorities determined for budgeting for O&M during the budget process? Does the owner or operator maintain a fund for future equipment and infrastructure replacement? How is new work typically financed? Comments: 3-15 Page 685 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 68 of 126 IV. B. Collection System Operation: Compliance Question Response Documentation Available Yes No Does the owner or operator have inter jurisdictional or inter- Already asked municipal agreements? Is there a sewer-use and a grease ordinance? Is there a process in place for enforcing sewer and grease ordinances? Are all grease traps inspected regularly? How does the owner or operator learn of new or existing unknown grease traps? Who is responsible for enforcing the sewer ordinance and grease ordinance?Does this party communicate with the utility department on a regular basis? Are there any significant industrial dischargers to the system? Is there a pretreatment program in place?If so,please describe. Is there an ordinance dealing with private service laterals? Is there an ordinance dealing with storm water connections or requirements to remove storm water connections? Comments: • 3-16 Page 686 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 69 of 126 IV. C. Collection System Operation: Water Quality Monitoring Question Response Documentation Available Yes No Is there a water quality monitoring program in the service areas? If so,who performs the monitoring? How many locations are monitored? What parameters are monitored and how often? Is water quality monitored after an SSO event? Are there written standard sampling procedures available? Is analysis performed in-house or by a contract laboratory? Are chain-of-custody forms used? Comments: 3-17 Page 687 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 70 of 126 IV. D. Collection System Operation: Hydrogen Sulfide Monitoring and Control Question Response Documentation Available Yes No Are odors a frequent source of complaints?How many? Are the locations of the frequent odor complaints documented? What is the typical sewer slope?Does the owner or operator take hydrogen sulfide corrosion into consideration when designing sewers? Does the collection system owner or operator have a hydrogen sulfide problem,and if so,does it have in place corrosion control programs?What are the major elements of the program? Does the owner or operator have written procedures for the application of chemical dosages? Are chemical dosages,dates,and locations documented? Does the owner or operator have a program in place for renewing or replacing severely corroded sewer lines to prevent collapse? Are the following methods used for hydrogen sulfide control: ❑ aeration,❑iron salts,0 enzymes, ❑activated charcoal canisters,❑ chlorine, ❑sodium hydroxide, 0 hydrogen peroxide,0 potassium permanganate,❑biofiltration,0 others? Does the system contain air relief valves at the high points of the force main system? How often are th valves maintained and inspected(weekly,monthly, etc.)? Does the owner or operator enforce pretreatment requirements? Comments: • 3-18 Page 688 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 71 of 126 IV. E. Collection System Operation: Safety Question Response Documentation Available Yes No Is there a documented safety program supported by the top administration official? Is there a Safety Department that provides training,equipment,and an evaluation of procedures? If not,who provides safety training? Does the owner or operator have written procedures for the following: 0 lockout/tagout,❑MSDS,❑chemical handling,❑ confined spaces permit program,❑trenching and excavations,❑ biological hazards in wastewater,0 traffic control and work site safety,❑electrical and mechanical systems,0 pneumatic and hydraulic systems safety? What is the agency's lost-time injury rate(percent or in hours)? Is there a permit required confined space entry procedure for manholes,wetwells,etc.? Are confined spaces clearly marked? Are the following equipment items available and in adequate supply: ❑rubber/disposable gloves;❑ confined space ventilation equipment; 0 hard hats,0 safety glasses,❑rubber boots;❑ antibacterial soap and first aid kit;❑tripods or non-entry rescue equipment;0 fire extinguishers;❑equipment to enter manholes; ❑ portable crane/hoist;❑atmospheric testing equipment and gas detectors;❑oxygen sensors;❑H2S monitors;❑full body harness; ❑protective clothing;❑traffic/public access control equipment; ❑ 5-minute escape breathing devices;❑ life preservers for lagoons; ❑safety buoy at activated sludge plants;❑fiberglass or wooden ladders for electrical work;❑respirators and/or self-contained breathing apparatus; ❑methane gas or OVA analyzer;❑ LEL metering? Are safety monitors clearly identified? How often are safety procedures reviewed and revised? 3-19 Page 689 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 72 of 1 2F; Question Response Documentation Available Yes No Are workplace accidents investigated? How does the Administration communicate with field personnel on safety procedures;memo,direct communication,video,etc.? Is there a Safety Committee with participation by O&M staff?How often does it meet? Is there a formal Safety Training Program? Are records of training maintained? Comments: 3-20 Page 690 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 73 of 126 IV. F. Collection System Operation: Emergency Preparedness and Response Question Response Documentation Available Yes No Does the owner or operator have an emergency response plan?A contingency plan? How often is the plan reviewed and updated?What was the date it was last updated? Does the plan take into consideration vulnerable points in the system,severe natural events,failure of critical system components, vandalism or other third party events,and a root cause analysis protocol? Are staff trained and drilled to respond to emergency situations?Are responsibilities detailed for all personnel who respond to emergencies? Are there emergency operation procedures for equipment and processes? Does the owner or operator have standard procedures for notifying state agencies, local health departments,the regulatory authority, and drinking water authorities of significant overflow events? Does the procedure include an up-to-date list of the names,titles, phone numbers,and responsibilities of all personnel involved? Do work crews have immediate access to tools and equipment during emergencies? Is there a public notification plan? If so,does it cover both regular business hours and off-hours? Does the owner or operator have procedures to limit public access to and contact with areas affected with SSOs? Does the owner or operator use containment techniques to protect the storm drainage systems? 3-21 Page 691 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 74 of 12f Do the overflow records include the following information: ❑date and time,❑cause(s),❑names of affected receiving water(s), ❑ location,❑how it was stopped,❑any remediation efforts, ❑estimated flow/volume discharged,0 duration of overflow? Does the owner or operator have signage to keep public from affected area? Is there a hazard classification system?Where is it located? Does the owner or operator conduct vulnerability analyses? Are risk assessments performed?How often? Comments: 3-22 Page 692 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 75 of 126 IV. G. Collection System Operation: Modeling Question Response Documentation Available Yes No Does the owner or operator have a hydraulic model of the collection system including pump stations?What model is used? What uses does the model serve(predicting flow capacity,peak flows,force main pressures,etc.)? Does the model produce results consistent with observed conditions? Is the model kept up to date with respect to new construction and repairs that may affect hydraulic capacity? Comments: 3-23 Page 693 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 76 of 126 IV. H. Collection System Operation: Engineering - System Mapping and As-built Plans (Record Drawings) Question Response Documentation Available Yes No What type of mapping/inventory system is used? Is the mapping tied to a GPS system? Are"as-built"plans(record drawings)or maps available for use by field crews in the office and in the field? Do field crews record changes or inaccuracies and is there a process in place to update"as built"plans(record drawings)? Do the maps show the date the map was drafted and the date of the last revision? Do the sewer line maps include the following:❑scale;❑north arrow;❑date the map was drafted;❑date of the last revision; El service area boundaries;0 property lines;❑other landmarks; ❑ manhole and other access points;❑location of building laterals;El street names; 0 SSOs/CSOs;❑flow monitors;0 force mains;❑ pump stations; 0 lined sewers; ❑main,trunk,and interceptor sewers;❑easement lines and dimensions;El pipe material;❑pipe diameter;❑pipe diameter;❑installation date;❑slope; 0 manhole rim elevation;0 manhole coordinates;El manhole invert elevation; ❑ distance between manholes? Are the following sewer attributes recorded:0 size,❑shape, ❑ invert elevation,❑material, El separate/combined sewer, El installation date? Are the following manhole attributes recorded:❑ shape, ❑type, ❑ depth,❑age,❑material? Is there a systematic numbering and identification method/system established to identify sewer system manhole,sewer lines,and other items(pump stations,etc.)? Comments: 3-24 Page 694 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 77 of 126 IV. I. Collection System Operation: Engineering - Design Question Response Documentation Available Yes No Is there a document which details design criteria and standard construction details? Is life cycle cost analysis performed as part of the design process? Is there a document that describes the procedures that the owner or operator follows in conducting design review?Are there any standard forms that are used as a guide? Are O&M staff involved in the design review process? Does the owner or operator have documentation on private service lateral design and inspection standards? Does the owner or operator attempt to standardize equipment and sewer system components? Comments: 3-25 Page 695 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 78 of 126 IV. J. Collection System Operation: Engineering - Capacity Question Response Documentation Available Yes No What procedures are used in determining whether the capacity of existing gravity sewer system,pump stations and force mains are adequate for new connections? Is any metering of flow performed prior to allowing new connections? Is there a hydraulic model of the system used to predict the effects of new connections? Is there any certification as to the adequacy of the sewer system to carry additional flow from new connections required? Comments: 3-26 Page 696 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 79 of 126 IV. K. Collection System Operation: Engineering - Construction Question Response Documentation Available Yes No Who constructs new sewers? If other than the owner or operator, does the owner or operator review and approve the design? Is there a document that describes the procedures that the owner or operator follows in conducting their construction inspection and testing program? Are there any standard forms that guide the owner or operator in conducting their construction inspection and testing program? Is new construction inspected by the owner or operator or others? What are the qualifications of the inspector(s)? What percentage of time is a construction inspector on site? Is inspection supervision provided by a registered professional engineer? How is the new gravity sewer construction tested?(Air,water,weirs, etc.) Are new manholes tested for inflow and infiltration? Are new gravity sewers televised? What tests are performed on pump stations? What tests are performed on force mains? Is new construction built to standard specifications established by the owner or operator and/or the State? Is there a warranty for new construction?If so,is there a warranty inspection done at the end of this period? Comments: 3-27 Page 697 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 80 of 126 IV. L. Collection System Operation: Pump Station Operation Question Response Documentation Available Yes No How many pump stations are in the system?How many have backup power sources? Are enough trained personnel assigned to properly maintain pump stations? Are these personnel assigned full-time or part-time to pump station duties? Are there manned and un-manned pump stations in the system? How many of each? Is there a procedure for manipulating pump operations(manually or automatically during wet weather to increase in-line storage of wet weather flows? Are well-operating levels set to limit pump start/stops? Are the lead,lag,and backup pumps rotated regularly? Comments: 3-28 Page 698 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 81 of 126 IV. L. 1. Collection System Operation: Pump Stations - Inspection Question Response Documentation Available Yes No How often are pump stations inspected? What work is accomplished during inspections? Is there a checklist? Are records maintained for each inspection? What are the average annual labor hours spent on pump station inspections? Are there Standard Operating Procedures(SOPs)and Standard Maintenance Procedures(SMPs)for each station? What are the critical operating characteristics maintained for each station? Are the stations maintained within these criteria? Comments: 3-29 Page 699 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 82 of 126 IV. L. 2. Collection System Operation: Pump Stations - Emergencies Question Response Documentation Available Yes No Is there an Emergency Operating Procedure for each pump station? Is there sufficient redundancy of equipment in all pump stations? Who responds to lift station failures and overflows?How are they notified? How is loss of power at a station dealt with?(i.e. on-site electrical generators,alternate power source,portable electric generator(s)) What equipment is available for pump station bypass? What process is used to investigate the cause of pump station failure and take necessary action to prevent future failures? Comments: 3-30 Page 700 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 83 of 126 IV. L. 3. Collection System Operation: Pump Stations - Emergency Response and Monitoring Question Response Documentation Available Yes No How are lift stations monitored? If a SCADA system is used,what parameters are monitored? Comments: 3-31 Page 701 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 84 of 126 IV. L. 4. Collection System Operation: Pump Stations - Recordkeeping Question Response Documentation Available Yes No Are operations logs maintained for all pump stations? Are manufacturer's specifications and equipment manuals available for all equipment? Are pump run times maintained for all pumps? Are elapsed time meters used to assess performance? Comments: 3-32 Page 702 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 85 of 126 IV. L. 5. Collection System Operation: Pump Stations - Force Mains and Air/Vacuum Valves Question Response Documentation Available Yes No Does the owner or operator regularly inspect the route of force mains? Does the owner or operator have a program to regularly assess force main condition? Is there a process in place to investigate the cause of force main failures? Does the owner or operator have a regular maintenance/inspection program for air/vacuum valves? Have force main failures been caused by water hammer? Comments: 3-33 Page 703 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 86 of 126 V. A. Equipment and Collection System Maintenance: Maintenance Budgeting Question Response Documentation Available Yes No How does the collection system owner or operator track yearly maintenance costs? Is there a maintenance cost control system? Are maintenance costs developed from past cost records? How does the owner or operator categorize costs? Preventive?Corrective?Projected Costs?Projected Repair? How does the owner or operator control expenditures? Comments: 3-34 Page 704 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 87 of 126 V. B. Equipment and Collection System Maintenance: Planned Maintenance Question Response Documentation Available Yes No Are preventive maintenance tasks and frequencies established for all pump stations and equipment? How were preventive maintenance frequencies established? What percentage of the operator's time is devoted to planned as opposed to unplanned maintenance? What predictive maintenance techniques are used as part of PM program? Is there a formal procedure to repair or replace pump stations and equipment when useful life is reached? Has an energy audit been performed on pump station electrical usage? Is an adequate parts inventory maintained for all equipment? Is there a sufficient number of trained personnel to properly maintain all stations? Who performs mechanical and electrical maintenance? Are there Standard Maintenance Procedures(SMPs)for each station? Comments: 3-35 Page 705 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 88 of 126 V. C. Equipment and Collection System Maintenance: Maintenance Scheduling Question Response Documentation Available Yes No Does the owner or operator plan and schedule preventive and corrective maintenance activities? Is there an established priority system? Who sets priorities for maintenance? Is a maintenance card or record kept for each piece of mechanical equipment within the collection system? Do equipment maintenance records include the following information: ❑maintenance recommendations, ❑instructions on conducting the specific maintenance activity,❑other observations on the equipment,❑maintenance schedule,❑a record of maintenance on the equipment to date. Are dated tags used to show out-of-service equipment? Is maintenance backlog tracked? How is O&M performance tracked and measured? What percent of repair finds are spent on emergency repairs? Are corrective repair work orders backlogged more than six months? Is maintenance performed for other public works divisions? How are priorities determined for this work? How is this work funded? Are maintenance logs maintained for all pump stations? Comments: 3-36 Page 706 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 89 of 126 V. D. Equipment and Collection System Maintenance: Maintenance Right-of-Way Question Response Documentation Available Yes No Does the owner or operator perform scheduled maintenance on Rights-of-Way and Easements? Does the owner or operator monitor street paving projects? Does the owner or operator have a program to locate and raise manholes(air valves,etc)as needed? How are priorities determined? How is the effectiveness of the maintenance schedule measured? Comments: 3-37 Page 707 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 90 of 126 V. E. Equipment and Collection System Maintenance: Sewer Cleaning Question Response Documentation Available Yes No Is there a routine schedule for cleaning sewer lines on a system wide basis,e.g.,at the rate of once every seven to twelve years or a rate of between 8%and 14%per year? What is the owner or operator's goals for annual system cleaning? What percent of the sewer lines are cleaned,even high/repeat cleaning trouble spots,during the past year? Is there a program to identify sewer line segments that have chronic problems and should be cleaned on a more frequent schedule? What is the average number of stoppages experienced per mile of sewer pipe per year? Has the number of stoppages increased,decreased,or stayed the same over the past five years? Are stoppages diagnosed to determine the cause? Are stoppages plotted on maps and correlated with other data such as pipe size and material,or location? Do the sewer cleaning records include the following information: ❑ date and time,❑cause of stoppage,❑method of cleaning,location of stoppage or routine cleaning activity,❑ identity of cleaning crew, ❑further actions necessary/initiated? If sewer cleaning is done by a contractor are videos taken of before and after cleaning? Comments: 3-38 Page 708 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 91 of 126 V. E. 1. Equipment and Collection System Maintenance: Sewer Cleaning - Cleaning Equipment Question Response Documentation Available Yes No What type of cleaning equipment does the owner or operator use? How many cleaning units of each type does the owner or operator have?What is the age of each? How many cleaning crews and shifts does the owner or operator employ? How many cleaning crews are dedicated to preventive maintenance cleaning? How many cleaning crews are dedicated to corrective maintenance cleaning? What has the owner or operator's experience been regarding pipe damage caused by mechanical equipment? Where is the equipment stationed? Comments: 3-39 Page 709 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 92 of 126 V. E. 2. Equipment and Collection System Maintenance: Sewer Cleaning - Chemical Cleaning and Root Removal Question Response Documentation Available Yes No Does the owner or operator have a root control program? Does the owner or operator have a FOG program? Are chemical cleaners used? What types of chemical cleaners are used? How often are they applied? How are the chemical cleaners applied? What results are achieved through the use of chemical cleaners? Comments: 3-40 Page 710 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 93 of 126 V. F. Equipment and Collection System Maintenance: Parts Inventory Question Response Documentation Available Yes No Does the owner or operator have a central location for the storage of spare parts? Have critical spare parts been identified? Are adequate supplies on hand to allow for two point repairs in any part if the system? Is there a parts standardization policy in place? Does the owner or operator maintain a stock of spare parts on its maintenance vehicles? What method(s)does the owner or operator employ to keep track of the location,usage,and ordering of spare parts?Are parts logged out when taken by maintenance personnel for use? Does the owner or operator salvage specific equipment parts when equipment is placed out-of-service and not replaced? How often does the owner or operator conduct a check of the inventory of parts to ensure that their tracking system is working? Who has the responsibility of tracking the inventory? For those parts which are not kept in inventory,does the owner or operator have a readily available source or supplier? Comments: 3-41 Page 711 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 94 of 126 V. G. Equipment and Collection System Maintenance: Equipment and Tools Management Question Response Documentation Available Yes No Is there a list of equipment and tools used for operation and maintenance? Do personnel feel they have access to the necessary equipment and tools to do all aspects of operation and maintenance of the collection system? Is there access to suitable equipment if the owner or operator's equipment is down for repair? Does the owner or operator own or have access to portable generators? Where does the owner or operator store its equipment? Is a detailed equipment maintenance log kept? Are written equipment maintenance procedures available? What is the procedure for equipment replacement? Are the services of an in-house vehicle and equipment maintenance services used? What is the typical turnaround time for equipment and vehicle maintenance? Comments: 3-42 Page 712 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 95 of 126 VI. Management Information Systems: Performance Indicators Question Response Documentation Available Yes No How many sanitary sewer overflows(SSOs)have occurred in the last 5 years?How many less than 1,000 gallons? Does the owner or operator document and report all SSOs regardless of size? Does the owner or operator document basement backups? Are there areas that experience basement or street flooding? How many SSOs have reached"Waters of the US"? Is there a record? Approximately,what percent of SSOs discharge were from each of the following in the last 5 years:manholes,pump stations,main and trunk sewers,lateral and branch sewers,structural bypasses? What is the per capita wastewater flow for the maximum month and maximum week or day? What is average annual influent BOD? What is the ratio of maximum wet weather flow to average dry weather flow? Approximately,what percent of SSO discharge were caused by the following in the last 5 years:debris buildup,collapsed pipe,root intrusion,capacity limitations,excessive infiltration and inflow, FOG,vandalism? What percent of SSOs were released to:soil;surface water; basements;paved areas;coastal,ocean,or beach areas;rivers,lakes or streams? For surface water releases,what percent are to surface waters that could affect: contact recreation,shellfish growing areas,drinking water sources? - How many chronic SSO locations are in the collection system? 3-43 Page 713 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 96 of 1 2A Are pipes with chronic SSOs being monitored for sufficient capacity and/or structural condition? Prior to collapse,are structurally deteriorating pipelines being monitored for renewal or replacement? What is the annual number of mainline sewer cave-ins?What was the cause(i.e.pipe corrosion,leaks,etc.) What other types of performance indicators does the owner or operator use? Comments: 3-44 Page 714 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 97 of VII. A. Sewer System Capacity Evaluation (SHIN): Internal TV Inspection Question Response Documentation Available Yes No Does the owner or operator use internal T.V.inspection?If so please describe the program. Do the internal TV record logs include the following: ❑pipe size, type,length,and joint spacing;❑distance recorded by internal TV; ❑results of the internal TV inspection;❑ internal TV operator name;❑cleanliness of the line;❑location and identification of line being televised by manholes? Is a rating system used to determine the severity of the defects found during the inspection process? L Is there documentation explaining the codes used for internal TV results reporting? Approximately what percent of the total defects determined by TV inspection during the past 5 years were the following: Are main line and lateral repairs checked by internal TV inspection after the repair(s)have been made? Comments: 3-45 Page 715 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 98 of VII. B. SSES: Survey and Rehabilitation (genal) Question Response Documentation Available Yes No Have SSES's been performed in the past?If so,is documentation available? Has any sewer rehabilitation work been done in the past 15 years?If so,please describe? Does the owner or operator have standard procedures for performing SSES work? Do the SSES reports include recommendations for rehabilitation, replacement,and repair? Were defects identified in the SSES repaired? Does the owner or operator have a multi-year Capital Improvements Program that includes rehabilitation,replacement,and repair? How are priorities established for rehabilitation,replacement,and repair? Has the owner or operator established schedules for performing recommended rehabilitation,both short term and long term? Has funding been approved for the recommended rehabilitation? Is post rehabilitation flow monitoring used to assess the success of the rehabilitation? Comments: 3-46 Page 716 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 99 of VII. C. SSES: Sewer Cleaning Related to I/I RIuction Question Response Documentation Available Yes No Are sewers cleaned prior to flow monitoring? Are sewers cleaned prior to internal T.V.inspection? When cleaning,is debris removed from the system? Comments: 3-47 Page 717 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 100 of VII. D. SSES: Flow Monitoring 126 Question Response Documentation Available Yes No Does the owner or operator have a flow monitoring program?If so, please describe. Does the owner or operator have a comprehensive capacity assessment and planning program? Are flows measured prior to allowing new connections? Number of permanent meters?Number of temporary meters? What type(s)of meters are used? Number of rain gauges? How frequently are flow meters checked? Do the flow meter checks include: ❑ independent water level, ❑ checking the desiccant,❑velocity reading,❑ cleaning away debris, ❑downloading data, ❑battery condition? Are records maintained for each inspection? Do the flow monitoring records include:❑descriptive location of flow meter,❑type of flow meter,❑ frequency of flow meter inspection,❑ frequency of flow meter calibration? Are flow data used for billing,capacity analysis,and/or I/I investigations? What is the ratio of peak wet weather flow to average dry weather flow at the wastewater treatment plant? Does the owner or operator have any wet weather capacity problems? Are low points or flood-plain areas monitored during rain events? Does the owner or operator have any dry weather capacity problems? 3-48 Page 718 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 101 of VII. E. SSES: Smoke Testing and Dyed WatexrFlooding Question Response Documentation Available Yes No Does the owner or operator have a smoke testing program to identify sources of inflow and infiltration into the system including private service laterals and illegal connections?If so please describe. Are there written procedures for the frequency and schedule of smoke testing? Is there a documented procedure for isolating line segments? Is there a documented procedure for notifying local residents that smoke testing will be conducted in the area? What is the guideline for the maximum amount of line to be tested at one time? Are there guidelines for the weather conditions under which smoke testing should be conducted? Do the written records contain location,address,and description of the smoking element that produced a positive result? What follow-up occurs as a result of positive results for smoke or dye testing? Is there a goal for the percent of the system smoke tested each year? What percent of the system has been smoke tested over the past year? Does the owner or operator have a dyed water flooding program If so please describe. Is there a goal for the percent of the system dye tested each year? What percent of the system has been dye tested over the past year? Does the owner or operator share smoke and dye testing equipment with another owner or operator? Comments: 3-49 Page 719 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 102 of VII. F. SSES: Manhole Inspection 126 Question Response Documentation Available Yes No Does the owner or operator have a routine manhole inspection and assessment program? What is the purpose of the inspection program? Does the owner or operator have a goal for the number of manholes inspected annually? How many manholes were inspected during the past year? Do the records for manhole/pipe inspection include the following: ❑ conditions of the frame and cover;❑ evidence of surcharge;offsets or misalignments;❑ atmospheric hazards measurements; ❑ details on the root cause of cracks or breaks in the manhole or pope including blockages; ❑recording conditions of corbel,walls,bench, trough,and pipe seals;❑presence of corrosion,if repair is necessary; ❑manhole identifying number/location;wastewater flow characteristics;❑ accumulations of grease,debris,or grit; ❑ presence of infiltration,location,and estimated quantity; ❑ inflow from manhole covers? Are manholes susceptible to inflow identified and inspected on a regular frequency? Is there a data management system for tracking manhole inspection S activities? What triggers whether a manhole needs rehabilitation? Does the owner or operator have a multi-year Capital Improvements Program that includes rehabilitation,replacement,and repair of manholes? How are priorities established for rehabilitation,replacement,and repair of manholes? Has the owner or operator established schedules for performing rehabilitation,both short term and long term of manholes? 3-50 Page 720 of 1707 Case 1:12-cv 21100-FAM Document 25 1 Entered on FLSD Docket 06/06/2013 Page 1C3 of Question 126 Response Documentation Available Yes No Has funding been approved for the rehabilitation of manholes? Does the owner or operator have a grouting program? Comments: 3-51 Page 721 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 104 of VIII. A. Rehabilitation: Manhole Repairs 126 Question Response Documentation Available Yes No What rehabilitation techniques are used for manhole repairs? How are priorities determined for manhole repairs? What type of documentation is kept? Does the owner or operator use manhole inserts? Are they used system wide or only on low lying manholes? Comments: 3-52 Page 722 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 105 of VIII. B. Rehabilitation: Mainline Sewers 126 Question Response Documentation Available Yes No What type of main line repairs has the owner or operator used in the past? Does the owner or operator currently use any of above techniques for main line repairs? What other techniques is the owner or operator presently using? How are priorities established for main line repairs? What type of follow-up is performed after the repair(e.g.,CCTV)? Comments: 3-53 Page 723 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 106 of 126 Appendix A EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM Page 724 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 107 of 126 EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM General Information A. Agency Name B. Agency Address Street City State Zip C. Contact Person D. Telephone: Voice Fax Email E. Data provided for latest fiscal/calendar year, 20 II. Collection System Description A. Service Area Square miles B. Population Served C. System Inventory Miles of gravity Miles of force Number of Number of Number of Number of air, sewer main maintenance pump stations siphons vacuum,or access air/vacuum structures relief valves D. Number of Service Connections: Residential Commercial Industrial Total E. Lateral Responsibility(check one) 1. At main line connection only 2. From main line to property line or easement/cleanout 3. Beyond property line/cleanout 4. Other F. System combined(storm and sanitary)? Yes_No_If yes, % combined G. Average Annual Precipitation inches H. System Flow Characteristics (total for service area) Peak Dry Weather Flow(MGD) Peak Wet Weather Flow(MGD) Average Daily Flow(MGD) A-1 Page 725 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 108 of 126 III. Special Conditions A. Indicate local conditions that are accounted for during design, construction, operation, and maintenance of the collection system. 1. Precipitation: Yes No If yes,provide brief explanation 2. Terrain: Yes No If yes,provide brief explanation 3. Soils: Yes No If yes, provide brief explanation 4. Temperature: Yes No If yes,provide brief explanation 5. Groundwater: Yes No If yes,provide brief explanation 6. Geology: Yes No If yes, provide brief explanation 7. Other: B. Is corrosion a significant problem? Yes—No • Is there a corrosion control program in place? Yes No C. Is odor a significant problem? Yes No • Is there an odor control program in place? Yes No D. Is grease a significant problem? Yes No • Is there a grease control program in place? Yes No E. Are roots a significant problem? Yes No • Is there a root control program in place? Yes No IV. Age Distribution of Collection System Age Gravity Sewer,miles Force Mains,miles or feet Number of Pump Stations 0-25 years 26-50 years 51-75 years >76 years A-2 Page 726 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 109 of 126 V. Size Distribution of Collection System Diameter in inches Gravity Sewer,miles Force Mains,miles or feet 8 inches or less 9- 18 inches 19-36 inches >36 inches VI. Distribution of Gravity Sewer By Material A. Vitrified Clay Pipe(VCP) Miles B. Reinforced Concrete Pipe(RCP) Miles C. Unreinforced Concrete Pipe (CP) Miles D. Plastic(all types) Miles E. Brick Miles F. Other Miles G. Other Miles H. Other Miles VII. Distribution of Force Mains By Material (circle one) A. Reinforced Concrete Pipe (RCP) miles or feet B. Prestressed Concrete Cylinder Pipe (PCCP) miles or feet C. Asbestos Cement Pipe(ACP) miles or feet D. Polyvinyl Chloride (PVC) miles or feet E. Steel miles or feet F. Ductile Iron miles or feet G. Cast Iron miles or feet H. Techite(RPMP) miles or feet I. High Density Polyethylene(HDPE) miles or feet J. Fiberglass Reinforced Plastic (FRP) miles or feet K. Other miles or feet A-3 Page 727 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 110 of 126 VIII. Preventive Maintenance of System A. Physical Inspection of Collection System,Preventive Maintenance Inspection Activity Total Annual Labor Total Completed(Miles Crew Size(s) Hours Expended for This of Pipe or Manholes Activity Inspected Annually) CCTV Visual Manhole Inspection,Surface Only Visual Manhole Inspection,Remove Cover Visual Gravity Line Inspection,Surface Only Visual Force Main Inspection,Surface Only Other(Sonar,etc.) B. Mechanical and Hydraulic Cleaning, Preventive Maintenance Cleaning Total Annual Total Annual Total Miles Crew Size(s) Range of Pipe Activity Labor Hours Labor Hours Cleaned Diameters Expended for Expended for Annually Cleaned This Activity Scheduled PM Hydraulic Jet Bails,Kites, Scooters Combination Machines Rod Machines Hand Rodding Bucket Machines Chemical Root Control Chemical or Biological Grease Control A-4 Page 728 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 111 of 126 IX. Dry Weather Stoppages A. Number of stoppages,annually B. Average time to clear stoppage C. Number of stoppages resulting in overflows and/or backups annually D. Total quantity of overflow(s) E. Is there an established procedure for problem diagnosis?Yes No F. Are future preventive measures initiated based on diagnosis?Yes No G. What equipment is available for emergency response? X. Repairs and Rehabilitation,Proactive A. Number of annual spot repairs identified B. Number of annual spot repairs completed C. Percent of spot repairs contracted D. Number of manholes identified for rehabilitation E. Number of manholes rehabilitated annually F. Percent of manhole repairs contracted G. Feet of main line needing rehabilitation H. Feet of main line rehabilitated I. Percent of main line rehabilitation contracted J. Number of manholes scheduled for rehabilitation under Capital Improvement Program(s) K. Feet of main line scheduled for rehabilitation under Capital Improvement Program(s) XI. Repairs and Rehabilitation,Reactive A. Number of annual line features B. Number of line repairs XII. Pump Stations A. Number of pump stations inspected • Frequency of inspections (daily,every other day,weekly) B. Number of inpsection crews C. Crew size D. Number of pump stations with pump capacity redundancy E. Number of pump stations with backup power sources F. Number of pump stations with dry weather capacity limitations G. Number of pump stations with wet weather capacity limitations H. Number of pump stations calibrated annually I. Number of pump stations with permanent flowmeters J. Number of pump stations with remote status monitoring K. Number of pump stations with running time meters L. Number of mechanical maintenance staff assigned to mechanical maintenance M. Number of electrical maintenance staff assigned to electrical maintenance N. Total labor hours scheduled annually for electrical and mechanical PM tasks 0. Total labor hours expended annually for electrical and mechanical PM tasks XIII. Pump Station Failures,Dry Weather A. Number of failures resulting in overflows/bypass or backup,annually B. Total quantity of overflow/bypass Gallons or MG C. Average time to restore operational capability hours D. Total labor hours expended for electrical and mechanical corrective maintenance tasks E. Is failure mode and effect diagnosed? Yes_No F. Are future preventive measures initiated based on diagnosis? Yes_No _ G. What equipment is available for emergency response? A-5 Page 729 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 112 of 126 XIV. Force Mains A. Force mains inspected annually miles or feet(visual surface inspection of alignment) B. Force mains monitored annually miles or feet(pressure profile,capacity) C. Number of force main failures annually D. Cause(s)of force main failures XV. Air Relief/Vacuum Valves A. What is frequency of valve inspections? B. What is frequency of PM(backflushing,etc)? C. Number of annual valve failures D. Cause(s)of valve failures XVI. System Operation and Maintenance Efficiency A. Total full time or full time equivalent staff assigned to 0&M(excluding administration staff but including line managers,supervisors) B. Total estimated labor hours actually expended for active 0&M tasks(this is the total above less hours for sick,vacation,holidays,training,breaks,etc.,not directly related to performing 0&M tasks) XVII. Level of Service A. Average annual rate for residential users B. Rate based on:water consumption Flat rate Other C. Number of complaints annually D. Number of complaints that are agency responsibility E. Number of public health or other warnings issued annually F. Number of claims for damages due to backups annually G. Total cost of claims settled annually XVIII. Financial A. Total annual revenue received from wastewater 1. %of revenue for long-term debt 2. %of revenue for treatment and disposal 3. %of revenue for collection and conveyance B. Current value of collection system assets C. Annual 0&M expenditure D. Annual CIP expenditure for repair,replacement,or rehabilitation E. Annual 0&M training budget F. Total number of 0&M personnel(including administrative in 0&M department) G. Number of personnel with collection system certification H. Number of personnel qualified for collection system certification I. Amount of 0&M budget allocated for contracted services J. Hydroflush cost per foot K. Rodding cost per foot L. Bucketing cost per foot M. CCTV cost per foot N. Spot repairs,cost each XIX. Safety A. Total labor hours assigned to 0&M B. Number of lost time injuries C. Total lost time days D. Total cost of lost time injuries A-6 Page 730 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 113 of 126 XX. Regulatory A. Total number of violations issued annually B. Total cost of fines paid annually C. What is minimum reportable quantity in gallons? D. What is time reporting requirement? E. Number of annual WWTP upsets due to wet weather flow XXI. General A. Has SSES been performed on system? Yes No B. Total 0&M positions currently budgetd C. Total 0&M positions currently filled D. Is computerized maintenance management system(s)used for 0&M managing?Yes—No E. Is GIS system used for 0&M managing? Yes No XXII. Procedures or Other Documentation Available A. Overflow,bypass and containment Yes No B. Problem evaluation and solution Yes No C. Cleanup procedure Yes No D. Failure mode and effect procedure Yes No E. 0&M budget process Yes No F. 0&M budget with line item detail Yes No G. Long-range CIP planning for system expansion,rehabilitation,and replacement Yes No H. Is there a written procedure for cleanup to mitigate effect of overflow?Yes No I. Is there a written procedure for containing overflows and bypasses?Yes No J. Is there an established procedure for containing overflows and bypasses?Yes No K. Is there an established procedure for problem evaluation and solution?Yes No L. Is there an established procedure for cleanup to mitigate effect of overflow?Yes No M. Is there a grease control program?Yes No N. Is there a pretreatment program?Yes No 0. Is there a private source I/I reduction program?Yes No P. Do you have chronic 0&M problems that are designed into your system?Yes No If yes,provide brief description Q. Do you have chronic 0&M problems that are constructed into your system?Yes No _ If yes,provide brief description R. How would you rate your construction inspection program? Very effective Needs improvement Poor XXIII. Definitions/Clarifications A. Maintenance access structures,most commonly manholes,in your system that are incorporated into your 0&M program. B. Pump capacity redundancy is the ability to maintain pumping at design capacity with the largest pump out of service. C. Remote status monitoring is any remote monitoring system such as alarm telemetry or SCADA that provides remote pump station status information. D. You will notice that in the section on stoppages and pump station failures,we are asking for dry weather incidents only. Dry weather system performance is a good indicator or effectiveness of 0 &M program. If you have wet weather information that you wish to provide also,please do. E. Under the Special Conditions sections we are identifying conditions that are present in your system that require consideration during design,construction,and 0&M of your system. A-7 Page 731 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 114 of 126 F. Any of the questions dealing with labor hours are designed to determine total labor hours irrespective of crew size or crews that are only assigned to cleaning,for example,less than full time. G. Our goal is to obtain data that can be or are standardized and that are accurate. We also realize that some data may not be available;however,data can be accurately estimated. If you estimate data please follow with an(E). H. If data is not available please indicate"NA." If data does not apply to your system,please indicate by"DNA." I. Failure mode and effect refers to any established procedure you have to diagnose system failures to determine the cause and effect of the failure. This can apply to crews clearing stoppages or to pump station failures. J. Pump station inspection(XII)means scheduled inspection by operators to verify station operation and perform PM. It excludes electrical or mechanical craft maintenance. K. Stoppage in section IX refers only to stoppages other than pump stations. Pump stations are covered in Section XIII. Backup in this case refers to a basement or other structure backup as opposed to main line sewer backup. XXIV. Additional Comments A-8 Page 732 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 115 of 126 Appendix B EXAMPLE INTERVIEW SCHEDULE AND TOPICS Page 733 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 116 of 126 EXAMPLE INTERVIEW SCHEDULE AND TOPICS Days 1 and 2 Interviews Work Practice Description Examples of Discussion Topics and Supporting Name Interview or Maintenance Documents Date,Time, Function and Location Senior Discuss project expectations,report review Management and comment process. Overview of organizational structure and "culture". Identify sensitive issues and how to approach. Schedule Project Kick off Overview and purpose of project. None Meeting Interview and field assessment process. Report content and review process. Questions and answers Physical Visual Inspection,pipe alignment. Reports,inspection forms,performance data, Inspection and inspection strategy,crew assignments and Testing—Gravity CCTV schedules,equipment available,current sewer system expenditures and budgeted amounts,area maps, Smoke and Dye Testing Standard Operating Procedures,field maps. Other B - 1 Page 734 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 117 of 126 Work Practice Description Examples of Discussion Topics and Supporting Name Interview or Maintenance Documents Date,Time, Function and Location Preventive High velocity jets and combination machines. Reports,performance data,preventive Maintenance- maintenance cleaning strategy,crew assignments Mechanical and Other hydraulic methods and schedules,equipment available,current and hydraulic budgeted,problem areas,Standard Operating cleaning Rodding Machines Procedures,Standard Maintenance Procedures, problem diagnosis Bucket Machines Chemical and Root control Grease control ordinance,enforcement,odor and biological corrosion control strategy,root control program, cleaning Grease control design for O&M considerations,materials used (MSDS),reports,performance data,preventive Odor control maintenance cleaning strategy,crew assignments • and schedules,equipment available,current and Corrosion control budgeted,problem areas,Standard Operating Procedures,Standard Maintenance Procedures, problem diagnosis,public education,enforcement Pump Stations Routine inspection Logs,inspection sheets, Standard Maintenance Procedures,Standard Operating procedures,pump Electrical and mechanical maintenance station inventory and attribute data base,spares inventory,Reports,performance data,preventive SCADA maintenance strategy,crew assignments and schedules,equipment available,current and Standby/emergency systems budgeted,critical pump stations,Standard Operating Procedures,Standard Maintenance Valves Procedures,problem diagnosis,preventive and predictive maintenance methods,maintenance Forcemains tasks and frequencies,O&M manuals,capacity issues • B - 2 Page 735 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 118 of 126 Work Practice Description Examples of Discussion Topics and Supporting Name Interview or Maintenance Documents Date,Time, Function and Location Training and Training program,technical,supervisory and Knowledge,skills and abilities,basic skills,career Certification management, paths,minimum qualifications,certification, educational assistance program, internal and Certification program external training,OJT,training budget Work Planning and scheduling work Complaints and emergencies normal hours and Management after hours. Materials management Corrective,preventive and predictive maintenance work orders,work backlog, labor utilization, Priority reports, Backlog management Procurement Manual or Computer Maintenance Management System(CMMS) B - 3 Page 736 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 119 of 126 Work Practice Description Examples of Discussion Topics and Supporting Name Interview or Maintenance Documents Date,Time, Function and Location Safety Safety committee Policy and procedures for trenching,confined space,lockout tagout,PPE. Safety manual, formal Safety meetings training,tracking,accident investigation Safety enforcement Documentation of comprehensive safety training - Compliance with safety regulations Documentation of effectiveness of safety program(e.g.,reduction of accidents) Documentation of attendance and learning at safety training sessions Financial Annual O&M Budget O&M budget process,line item accounts,five year CIP plan,repair,rehabilitation,replacement Rates strategy for pipes and pump stations CIP for rehabilitation/rehab Non-enterprise fund allocations B -4 Page 737 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 120 of 126 Work Practice Description Examples of Discussion Topics and Supporting Name Interview or Maintenance Documents Date,Time, Function and Location Construction and Emergency repair Reports,inspection forms,performance data, Repair inspection strategy,crew assignments and Spot repairs,gravity system schedules,equipment available,current and budgeted,area maps,Standard Operating Rehabilitation Procedures,field maps, Lateral installation Inspection New Construction Testing Fleet Maintenance Inventory,repair and replacement process, Management maintenance turn around time,preventive Replacement maintenance,Standard Operating Procedures, Standard Maintenance Procedures,CMMS, Availability Budgeting B - 5 Page 738 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 121 of 126 Day 3 - Field Pump Stations Work Practice Description Examples of Discussion Topics and Supporting Name Interview or Maintenance Documents Date,Time Function and Location Pump Station Submersible Logs,O&M manuals,on-site procedures,vehicles Maintenance and equipment,SCADA,Supervisory controls, Cast in place wet well dry well electrical systems,flow meters,HVAC,variable speed systems,chronic problems,pumps and Prefabricated hydraulic systems. Grinder/Low Pressure System B - 6 Page 739 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 122 of 126 Day 4 — Field Facilities and Crews Work Practice Description Examples of Discussion Topics and Supporting Name Interview or Maintenance Documents Date,Time Function and Location Facilities Electrical and mechanical repair shops and Logs,O&M manuals,on-site procedures,vehicles equipment and equipment,SCADA,Supervisory controls, electrical systems,flow meters,HVAC,variable Warehouse and equipment storage areas speed systems,chronic problems,pumps and hydraulic systems, Vehicle maintenance shops Crew areas;locker rooms,training areas, dispatch areas Crews CCTV N/A Cleaning Construction Repair None Overview of findings for week Exit Interview B - 7 Page 740 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 123 of 126 Appendix C INFORMATION SOURCES Page 741 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 124 of 126 Information Sources (Updated November 2004) WEBSITES (water and/or wastewater-oriented;financial related) EPA National Compliance Assistance Clearinghouse www.epa.gov/clearinghouse Compliance Assistance Centers http://www.assistancecenters.net Construction Industry Compliance Assistance Center www.cicacenter.org EPA NPDES website http://www.epa.gov/npdes EPA Operator On-Site Technical Assistance Program-104(g) www.epa.gov/owm/mab/smcomm/104g/sstc.htm (hands-on assistance to small municipal WWTP operators at no cost to community) EPA Office of Wastewater Management www.epa.gov/owm EPA Clean Water Tribal Grant Program www.epa.gov/owm/mab/indian/cwisa.htm EPA Colonias Program www.epa.gov/owm/mab/mexican EPA Clean Water State Revolving Loan Fund Program www.epa.gov/owm/cwfinance/cwsrf EPA Website(Headquarters&Regions) www.epa.gov/ EPA Small Business Gateway http://www.epa.gov/smallbusiness Environmental Finance Center http://sspa.boisestate.edu/efc National Environmental Services Center/WV University www.nesc.wvu.edu Local Govt.Environmental Assistance Network www.lgean.org Rural Community Assistance Program(RCAP) www.rcap.org Water Environment Federation(WEF) www.wef.org AMSA www.amsa-cleanwater.org/pubs/ American Water Works Assoc.(AWWA) http://www.awwa.org/ National Association of Towns&Townships(NATAT) http://www.natat.org/ PUBLICATIONS/TRAINING VIDEOS/NEWSLETTERS,etc. EPA National Service Center For Environmental Publications(NSCEP) USEPA/NSCEP PO Box 42419 Cincinnati,OH 45242 Tele: 1-800-490-9198 or 513-489-8190(fax: 513-489-8695) EPA Office of Water Resource Center Tele:202-566-1729(24 hours) center.water-resources(&,eva.gov Cl Page 742 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 125 of 126 National Environmental Services Center(formerly the National Small Flows Clearinghouse) West Virginia University Small Business Gateway P.O.Box 6064 Morgantown,WV 26506 Tele: 1-800-624-8301 California State University- Sacremento Tele:916-278-6142 (training videos,etc.) List Compiled by Sharie Centilla,USEPA/OECA centilla.sharie(a,epa.gov 33 • C2 Page 743 of 1707 Case 1:12-cv-24400-FAM Document 25-4 Entered on FLSD Docket 06/06/2013 Page 126 of 126 Guide for Evaluating CMOM Programs at Wastewater Collection Systems REFERENCES California State University (CSU) Sacramento.1996. Operation and Maintenance of Wastewater Collection Systems. Volume I, Fifth Ed. Prepared for EPA, Office of Water Programs Operations. Sacramento, CA: California State University, Sacramento Foundation. California State University (CSU) Sacramento. 1998. Operation and Maintenance of Wastewater Collection Systems. Volume II, Fifth Ed. Prepared for EPA, Office of Water Programs Operations. Sacramento, CA: California State University, Sacramento Foundation. U.S. EPA National Enforcement Investigations Center (NEIC). 1992. Multi-media Investigations Manual. EPA-330/9-89-003-R. U.S. Environmental Protection Agency. 1974. "Process Design Manual for Sulfide Control in Sanitary Sewerage Systems." Prepared for the Technology Transfer Office of the U.S. Environmental Protection Agency. EPA 625/1-74-005. pg. 3-27. U.S. EPA Office of Water. 1973. Manpower Requirements for Wastewater Collection Systems in Cities and Towns of up to 150,000 Population. EPA-832-R-73-104. U. S. EPA Office of Water. 1974. Manpower Requirements for Wastewater Collection Systems in Cities of 150,000 to 500,000 Population. EPA-832-R-74-102. U.S. EPA Office of Water. 1983. Procedures Manual for Reviewing a POTW Pretreatment Program Submission. EPA-833-B-83-200. U.S. EPA Office of Water. 1985. Design Manual: Odor and Corrosion Control in Sanitary Sewerage Systems and Treatment Plants. EPA-625-1-85-018. U.S. EPA Office of Water. 2004. NPDES Compliance Inspection Manual. EPA-305-X-03-004. U.S. EPA Office of Water. 2004. Report to Congress:Impacts and Controls on CSOs and SSOs. EPA-833-R-04-001. Water Environment Federation. 1994. Existing Sewer Evaluation &Rehabilitation: WEF Manual of Practice FD-6, ASCE Manuals and Reports on Engineering Practice No. 62. Alexandria,VA: WEF. R-1 Page 744 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 1 of 53 EPA Region 4 Introduction to Conducting Evaluations of Municipal Wastewater Collection System Management, Operation, and Maintenance Programs Version 1.0 .N`Sfn.,T4r �' yu 9 ar 41 pH.YrG,\ PURPOSE&DISCLAIMER This document is the work product of the EPA Region 4,Water Management Division,Water Programs Enforcement Branch(WPEB)and supercedes a 10-30-1996 draft previously released. This document serves as an introduction for new Region 4 inspectors in the WPEB Municipal Infrastructure Enforcement Program and as introductory information for utilities invited to participate in the Region 4 Management,Operation,and Maintenance (MOM)Programs Project. Questions in this document are provided to initiate the thought process necessary for conducting an evaluation of a collection system. Formal instruction for conducting an evaluation under the MOM Programs Project is provided in separate literature. The MOM Programs Project is conducted in compliance with EPA Policy,EPA Guidance,and Rules and Regulations promulgated under the Clean Water Act. If some statement or part of the document is not in compliance with the Act,EPA Policy,EPA Guidance or the Rules and Regulations,then it should not be construed as conveying rights not conveyed by the Clean Water Act,EPA Policy,or the Rules and Regulations. September 2003 Page 745 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 2 of 53 Introduction Many collection systems have received minimal maintenance for many years. This has resulted in deteriorated sewers with a high potential for overflows, cave-ins,hydraulic overloads at treatment plants, and other problems. There are two central reasons for conducting an evaluation of a municipal collection system: Public and Environmental Health • Sanitary sewer overflows(SSOs)are a frequent cause of water quality violations. Beach closings, flooded basements, closed shellfish beds, and overloaded water treatment plants are a few of the symptoms of an _ inadequate collection system. Streams influenced by _ frequent SSOs support only the hardiest of species. Legal Considerations A discharge permit issued through the National r its Pollutant Discharge Elimination System (NPDES) 41 requires that the"permittee shall at all times properly operate and maintain all facilities and systems of treatment and control(and related appurtenances)that are installed or used by the permittee to achieve compliance with the conditions of this permit." SSOs may be considered a violation of this permit provision. SSOs may also be considered an unpermitted discharge of pollutants from a point source, as defined in the Clean Water Act. A goal of the collection system evaluation should be to discover if a utility is plagued by overflows and/or bypasses within its system of conveyance to a treatment facility. If so, what are the impacts? Is the utility aware of the problem?Are they taking appropriate steps to address the problem in a timely manner and prevent future reoccurrence? Page 746 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 3 of 53 Management The first stop on any evaluation should be the"home office." This ! �\ location is a point of administration, and may include functions such as . !� utility management, finance, engineering, planning, procurement, �L 14.1 warehousing, personnel, or legal review. In a large city,this work may be 06-KS split between different departments. A small town may have only one or two people doing some of these activities. Much of the information needed from this source can be obtained before the evaluation by a written request. Areas of review should include: V Financial Administration EPA and others have published guidance on the financial aspects of operating a wastewater utility. This is the single most important aspect of utility operation. Inadequate funding diminishes the chances for success. User Rate/User Charge • What are the utility's current rates? • How are user rates calculated? • How often are user charges adjusted based on that evaluation? L._'Vs • Does the utility receive full funding from its revenue? • Are utility funds used for other government activities? Budget The utility should be operating on an annual budget that details funding for all functions. • Does the utility budget for annual operating costs? •I — _ . • Does the budget provide sufficient itemization? _— - ' • Does the utility maintain a fund for future equipment and = infrastructure replacement? How is work financed? Page 2 of 22 Page 747 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 4 of 53 • Does the budget provide for sufficient funding? Public Education/Outreach r The utility should be talking with the public on issues 11111 such as user rates and charges. It is up to the utility to educate the public on wastewater treatment, its impact on water resources, and the importance of keeping the user rates current. By maximizing resources and operating facilities efficiently,the utility may be able to delay increases in user rates for a short time. Adjustments for more efficient operation should be made before approaching the public on these issues. • What type of public education/outreach programs does the utility have about the use of income from utility rates? • Do these programs include communication with several groups such as local governments, community groups, the media, young people (schools, youth organizations)? i/ Personnel Administration Organization • Is an organizational chart available which shows the various positions budgeted and filled? • Are position descriptions available? Operator Safety Program A utility can have several levels of a safety program. It should consist of top administration, a safety department, a safety committee, and field personnel. For a small utility,top administration could be the mayor while a large utility could employ a personnel manager. All utilities should have a safety program that includes a SAFETY safety policy, safety training and promotion, and accident investigation and reporting. FIRST • Is there a documented safety program supported by a top administration official? • Is there a safety department that provides training, Page 3 of 22 Page 748 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 5 of 53 equipment, and an evaluation of procedures? • Are all operators required to follow safe work procedures, such as the use of protective clothing and headgear, confined spaces, lock-out/tag-out policies, etc.? • Is there a confined space entry procedure for manholes, wet wells, etc.? • How often are safety procedures reviewed and revised? • Does the safety department communicate with field personnel on safety by a procedures memo, direct communication, a video, etc.? ✓ Equipment and Tools Administration The amount and types of equipment and tools held by a utility depend on the size, age, and condition of the system. The decision as to the type and amount of equipment to have on hand is a difficult one. A small utility may find it hard to justify the purchase of expensive, specialized equipment. The utility must identify the problems in the collection system and arrange for the appropriate tools and equipment accordingly. An alternative to purchasing is leasing, contracting, or sharing costs with other communities. • Is there a list of equipment and tools used for operation and maintenance? • Do field personnel feel they have access to the necessary equipment and tools to do all aspects of the operation and maintenance of its collection system? • Is there access to suitable equipment if the utility's equipment is down for repair? • Does the utility own or have ready access to a sufficient number of emergency power generators? • Where does the utility store its equipment? • Is a detailed equipment maintenance log kept? • Are written equipment maintenance procedures available? Page 4 of 22 Page 749 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 6 of 53 • What is the procedure for equipment replacement? • If an in-house motor pool is used,what is the turnaround time for service? Equipment that has reached its useful life should be replaced. To reduce the financial burden of equipment replacement, a fund should be established for equipment replacement. A utility should keep detailed records on the cost of operating the equipment to make good decisions about equipment replacement. V Legal Administration The utility should have legal documents to protect its collection system. Typically, sewer ordinances exist to satisfy Clean Water Act pretreatment regulations and to assure the utility's compliance with its NPDES permit. A legally sound sewer ordinance will give the utility retribution when corrosive and/or toxic materials are introduced into the collection system. Another important element is a grease control ordinance. Grease traps should be inspected by the utility for compliance. Some utilities choose to permit each trap owner. • Is there a sewer use and a grease control ordinance? • Is there active enforcement of the sewer and grease control ordinances? • Are all grease traps inspected regularly? • How does the utility learn of new or existing grease traps? • Who is responsible for enforcing the sewer ordinance and grease ordinance? Does this party communicate with the utility department on a regular basis? • Are there any significant industrial dischargers to the system? • Is there a pretreatment program in place? Page 5 of 22 Page 750 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 7 of 53 ✓ Engineering Administration System Mapping and As-Built Plans rb:, The utilityshould have an overall mapof the collection system with sufficient detail to allow easy interpretation. \� There should be a collection system inventory organized by • plant service areas that include the following information: Gravity Lines: Lineal feet by diameter Manholes: Number Pump Stations: Number by type Force Mains: Lineal feet by diameter Air Release Valves: Number and location Inverted Syphons: Number and location Other Major Appurtenances: Number and location Service Population By facility service area A sewer atlas detailing the location of the above items should be available. The type of sewer atlas used by the utility will depend on their needs and resources. A large metropolitan utility may find that a sophisticated, computerized mapping system is required. A small community may be satisfied with a hand-drafted version. • What type of mapping/inventory system is used? • Is there a procedure for recording changes and updating the mapping system? Mapping and inventory revisions should occur when there are changes in the collection system such as additions or repairs. Comprehensive maps of the system should be printed annually for large utilities, and a staff of "mappers"will likely be required to keep the maps up to date. Utilities may alternatively choose to contract map services. This is especially true if much catch-up work is required. Design and Capacity Analysis Through the interview and document review process,the evaluator should discover design procedures and the criteria needed for new work. In particular,the evaluator should discover how the utility determines the adequacy of the existing FZ: system for transmitting and treating future flows. The evaluator should discover what control the utility has over new connections to the system. Page 6 of 22 Page 751 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 8 of 53 • Is there a document which details the design criteria and standard construction details. for gravity sewers, force mains, and pump stations? • Is there a document that describes the procedures that the utility follows in conducting a design review? Are there any standard forms that guide the utility? • What procedures are used in determining whether the existing sewer system capacity is adequate for new connections? • Is any flow metering accomplished prior to allowing new connections? • Is there a mathematical model of flow in the system used to predict the effects of new connections? • Is any certification required which attests capacity is available for a new connection before it is made? Construction Through the interview and document review process, the evaluator should determine what procedures the utility uses to inspect and test new construction. '`These activities are important to ensure that new facilities do not contribute to future operation and maintenance problems. Excessive infiltration and = - inflow problems can exist with new construction if not properly built. • Is there a document that describes the procedures that the utility follows in conducting their construction inspection and testing program? Are there any standard forms that guide the utility in conducting their construction inspection and testing program? • Is new construction inspected by the utility or others? • What are the qualifications of the inspector(s)? • Is inspection supervision provided by a registered Professional Engineer? • How is new construction tested? (air, water, weirs, etc.) • Is new construction televised using closed-circuit camera techniques? • Is new construction built to standard specs set by the local utility and/or the State? Page 7 of 22 Page 752 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 9 of 53 • Is there a warranty for new construction? If so, is there a warranty inspection done at the end of this period? Sewer System Evaluation Survey(SSES) and Rehabilitation The SSES and sewer rehabilitation program is a structured methodology for finding the holes in a system and fixing them. Cost analysis is the major factor in determining the scope of rehabilitation. Due to the requirements of EPA's Construction Grants Program, many systems did evaluation surveys as a condition of their grant. Some systems also received grant funds for rehabilitation. The SSES is a two-phase operation. The first phase is to gather preliminary information and technical data. Flow monitoring, records and map evaluations, and system inspection are some of the tasks to be completed. Prioritizing areas for further evaluation is the end result of phase one. :_ The second phase is to conduct further testing of the prioritized 1. sewer areas identified in the preliminary phase and analyze these results. Rehabilitation recommendations based on a cost- effective analysis is the end result of phase two and concludes the SSES. Rehabilitation may consist of a variety of techniques designed to reduce inflow and infiltration into the sewer system. Many methods are available with highly variable costs and service lives. Rehabilitation costs are usually significantly less than replacement costs. SSES and rehabilitation activities are best described as a highly intensive program of operation and maintenance. Because over time many utilities have neglected proactive operation and maintenance of their sewer systems, these activities are often used to "catch-up"to a condition which can be maintained on a regular basis. Many of the techniques used in SSES and rehabilitation activities are described in the Operation and Maintenance section of this document, and should also be elements found in a proactive operation and maintenance program. • Have SSES activities been performed in the past? If so, is documentation available? • Has any sewer rehabilitation work been done in the past 15 years? • How many sanitary sewer overflows have occurred in the last year? • Is there a record? Page 8 of 22 Page 753 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 10 of 53 V Water Quality Monitoring Monitoring streams in the service areas can help identify problems in the collection system such as leaking pipes,washed-out stream crossings, and other pollution sources which could be attributed to the sewer system. Fecal Coliform is a common parameter monitored to detect _ potential contamination from sewers. • Is there a water quality monitoring program in the service areas? — • If so,what parameters are monitored and at what frequency? • How many locations are monitored? V Management Information Systems A management information system uses data from work reports prepared by field personnel to optimize the operation and maintenance of the collection system. A powerful tool, the information system is used as an aide to schedule preventive and reactive work on the system. It can also be used to measure efficiency, and track and develop costs. • What types of work reports are prepared by the field personnel? Examples include: -Main Sewer Construction -Main Sewer Maintenance -Main Sewer Repair - Structure Maintenance - Structure Repair or Abandonment -Building Sewer Maintenance -Building Sewer Repair • Do the work reports include complete and useful information? • How are records kept? • Does the facility use computer software to manage information? If so, what type of systems are used? Page 9 of 22 Page 754 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 11 of 53 • What kind of management reports are generated from the work report data? Examples include: - Payroll - Production - Work Costs - System Inventory - Main line maintenance history - Service line maintenance history - Main and service line repair history Performance Indicators Performance indicators are used to determine the condition of the system. These indicators are not absolute because there may be other reasons to suggest a less than adequate system condition. However, if several of the factors indicate possible problems, further investigation is warranted. • What is the per capita wastewater flow for the maximum month, week, and day? EPA considers Infiltration/Inflow (I/I) to be excessive if the total daily flow during periods of high groundwater exceeds 120 gallons per capita per day (gpcd), and during a storm event exceeds 275 gpcd. • What is average annual BOD of the treatment facility influent? An average of much less than 200 mg/L may indicate excessive I/I. • What is the ratio of maximum wet weather flow to average dry weather flow? A review of 10 case studies by EPA found that peak wet weather flow ranged from 3.5 to 20 times the average dry weather flow. Typically,as the ratio approaches 4 to 5, the likelihood of surcharge and overflow increases. • What is the annual number of overflows, and what are the causes (i.e., grease blockages, debris blockages, pump malfunctions, overloaded sewers, lift station power loss, etc.)? • What is the annual number of sewer cave-ins? What were the causes(i.e.,pipe corrosion, root intrusion, leaks, etc.) Page 10 of 22 Page 755 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 12 of 53 V Complaints • How are public complaints handled? • What are the common complaints received? • How often are these complaints reported? • Is there a record? • Does the utility have a procedure in place to evaluate and respond to complaints? V Public Relations • Is there a public relations program in place? • Are the employees of the utility trained in public relations? • What type of public notification is given for treatment plant upsets or collection system overflows? • Is the public notified prior to major construction or maintenance work? • How often does the utility communicate with other municipal departments? V Emergency Maintenance and/or Contingency Plans • Does the utility have a written emergency maintenance plan? • What type of equipment does the utility have available for emergency maintenance? How quickly can the utility access that equipment in case of an emergency? V Spare Parts Inventory Management • Does the utility have a central location for the storage of spare parts? • Have spare parts which are difficult to obtain,but critical to operation been identified? • Does the utility maintain a stock of common spare parts on its maintenance vehicles? Page 11 of 22 Page 756 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 13 of 53 • What methods are employed to keep track of the location, usage, and reordering of spare parts? Are parts logged out when taken by maintenance personnel for use? • Does the utility salvage specific equipment parts when equipment is placed out of service and not replaced? • How often does the utility conduct a check of the inventory of parts to ensure their tracking system is working? • Who has the responsibility to track the inventory? Operation and Maintenance The operation and maintenance(O&M) of a wastewater collection system is a difficult undertaking. Besides keeping the system in good working order, a proper O&M program should convey all wastewater to the treatment plant. A well-operated system will employ many, if not all, of the techniques described in this section. V Maintenance Scheduling • Does the utility schedule its maintenance activities? • How are priorities determined? eT • How is the effectiveness of the maintenance schedule measured? V Sewer Cleaning Sewer utilities have been cleaning lines for a long time. Most sewer cleaning programs have been directed towards emergency situations which occur due to stoppages. A better O&M program will have regular cleaning schedules for the system. • Is there a routine schedule established for cleaning sewer lines on a system-wide basis (e.g.,"once every seven to twelve years,"or"between 8% and 14%per year"? Page 12 of 22 Page 757 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 14 of 53 • Is there a process present to identify sewer line segments that have chronic problems and that should be cleaned on a more frequent schedule? Cleaning Equipment Mechanical cleaning equipment, such as a rodding device or bucket machine,has been the mainstay of utility cleaning operations for a long time. Though this type of equipment is still in use,hydraulic cleaning equipment which uses water pressure directed through a nozzle has generally replaced the need for mechanical equipment. • What type of cleaning equipment does the sewer utility use? • How many cleaning units of each type does the utility have? • How many cleaning crews and shifts does the utility employ? • How many cleaning crews are dedicated to routine cleaning? • How many cleaning crews are dedicated to emergency cleaning? • What has the utility's experience been regarding pipe damage caused by mechanical cleaning equipment? • Where is the cleaning equipment stationed? Chemical Cleaning and Root Removal Roots are a major cause of stoppages in many systems, so root removal and control is an important utility operation. • Does the utility have a root control program? • Are chemical cleaners used?What types? • How often are they applied? • How are the chemical cleaners applied? • What results are achieved through the use of chemical cleaners? Page 13 of 22 Page 758 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 15 of 53 ✓Hydrogen Sulfide Monitoring and Control The presence of hydrogen sulfide gas in gravity and pressure sewer lines can, and often does, lead to serious and catastrophic corrosion of concrete pipes and the metallic components of sewer systems. Hydrogen sulfide corrosion is usually a problem in areas having little topographic relief where there may be long travel times. Hydrogen sulfide corrosion can also be a problem downstream from pump stations having long wet well holding times. • Are odors a frequent source of complaints? • Has the sewer utility verified the existence/non-existence of a hydrogen sulfide problem, and if one is present, does it have in place corrosion control programs? • What are the major elements of the utility's program? A control program could be use of chemicals or aeration to prevent the formation of hydrogen sulfide. Pipe materials which resists corrosion are also effective. 40011 Often, a combination of approaches will be included in a program. V Lift Stations Lift stations are an important part of most wastewater systems. In coastal or other areas with little topographical relief, lift stations are a major O&M item. The effects of deteriorated collection systems are often realized at lift stations in the form of severe overflows during rain events. Operation • How many personnel are detailed to pump station operations and maintenance? • Are these personnel assigned full-time or part-time to pump station duties? NENENE . • Is there sufficient redundancy of equipment? Emergencies • Who responds to lift station overflows? How are they notified? Page 14 of 22 Page 759 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 16 of 53 • How is loss of power at a station dealt with? (e.g., on-site electrical generators, alternate power source,portable electric generators) Alarms and Monitoring • How are lift stations monitored? The answer to this question will depend on the station size, and the size and complexity of the system. In many systems, audible alarms or flashing lights are used to indicate a problem at the station. Reliance is placed on either the local populace or law enforcement to notice and report an alarm. In more modernized systems, alarm conditions are remotely monitored at a central location. This is particularly true for the larger stations. These SCADA(Supervisory Control and Data Acquisition) systems allow for real-time control,monitoring, and record keeping from remote locations. Inspection • How often are lift stations visited? 411L1100\144‘ • What is inspected during these visits? • Is there a checklist? Preventative and Routine Maintenance • Is there a preventive maintenance program for lift station equipment, and if so,what is involved in this program? • Is an adequate parts inventory maintained for all equipment? • Is there a sufficient number of trained personnel to properly maintain all stations? Record keeping • Are O&M logs maintained for all pump stations? • Are manufacturer's specifications and equipment manuals available for all equipment? • Are run-times or ampere readings recorded for all pumps?How is this information used to assess performance? Page 15 of 22 Page 760 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 17 of 53 Force Mains and Air Release/Vacuum Valves Force mains and air release/vacuum valves are an integral part of the transmission system. Force mains receive the lift station effluent and convey it to the gravity system or the treatment plant. Air release/vacuum valves are installed at the high points of the force main. The route of force mains should be inspected regularly in order to determine if any leaks are present. This is particularly true where the route is through remote areas. Air release/vacuum valves should be identified and receive regular documented maintenance. Malfunctions of these valves can lead to overflows and/or a reduced hydraulic capacity of the force main. • Does the utility schedule and conduct inspections of force main routes? • Does the utility have a scheduled maintenance/inspection program for air release/vacuum valves? ✓ Sewer System Evaluation As discussed in the Management section, many of the techniques in use for SSES work should be a part of a utility's operation and maintenance program. Larger utilities can justify the purchase of much of the equipment used in this effort. Flow Monitoring Flow monitoring data collection and evaluation should be an important part of a good O&M program. A well-designed flow monitoring program will give a snapshot of the current condition of the system. By isolating the portions of f the system that are making the greatest contribution to the problem, '� --=Ji- resources can be directed where they will be of greatest benefit. Techniques used to monitor flow include continuous metering, nighttime field measurements, quantification of pump run-times, __ _,:. and flow measurements taken at the treatment plant. Continuous __— _ flow measurement at key locations throughout the collection system will give the most accurate indication of system integrity. The other techniques have been used to some advantage with smaller systems. Use of meters which measure depth of flow and velocity will allow accurate results, even under surcharged conditions. Meters are available which allow continuous data recording Page 16 of 22 Page 761 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 18 of 53 which can either be downloaded locally or transmitted to a remote location. Coupled with appropriate software,this is a powerful tool for sewer system evaluation. • Does the utility have a flow monitoring program? If so, what methods are used? Manhole Inspection Inspecting manholes is an important part of any maintenance program. Often utilities are unaware of the location of many of their manholes. This is unfortunate since manholes are an important source of I/I and are good indicators of problems in the system. Missing manhole lids and offset manhole cones are often the result of sewer overflows. Debris on manhole steps or high waterlines indicate the presence of surcharged conditions. Some utilities use manhole inserts to reduce inflow to the system. A manhole insert is a small, tub-shaped plastic device installed at the top of the manhole and held in position by the manhole lid. Its purpose is to catch water that enters the manhole via holes in the lid or via the access pick holes. • Does the utility have a routine manhole inspection program? • Is there a data management system for documenting and tracking manhole inspection activities? • What triggers whether a manhole needs rehabilitation? Sewer Cleaning Related to I/I Reduction • Are sewers cleaned prior to flow monitoring? • Are sewers cleaned prior to televised inspection? Televised Inspection Inspecting sewers using closed-circuit television (CCTV)cameras is a powerful tool for I/I reduction. Leaking joints or punctures can be easily detected and often repaired at the time of inspection. CCTV is also a good method to inspect the integrity of new construction before the warranty expires. • Does the utility use televised inspection? If so, in what context? Smoke Testing and Dyed Water Flooding These techniques are useful to locate defects in the system and illegal connections. Page 17 of 22 Page 762 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 19 of 53 • Does the utility use smoke testing to identify sources of inflow into the system? • Does the utility use dyed water flooding to identify suspected sources (indirect connections)of inflow into the system when smoke testing yields inconclusive results? • Is there a data management system for tracking these activities? • Is there a document that describes the procedures that the utility follows? Are there any standard forms? ✓ Rehabilitation Several techniques are available for sewer rehabilitation. A determination of the best techniques to apply to a particular situation should be made following the SSES and an economic 111414 analysis comparing the different options. Main Line Repairs Point and Replacement Repairs Point repairs consist of repairing cracked, corroded, or broken gravity sewers and force mains. This work typically includes excavation to the location of the break, removal of the broken pipe section(s) and replacement with new pipe. Joint Testing and Grouting Joint testing and grouting are done on sewer line sections with leaking joints but no structural defects. This work can be done in conjunction with the routine televising of lines. Grouting has a limited life and must be repeated every 5-10 years. Sewer Lining Sewer lining is a technique which returns pipe to new condition. Many of the current systems can be used where pipe is structurally deficient. Due to the limited excavation required for these techniques,they are good choices where surface construction would cause much disruption. • What type of main line repairs has the utility used in the past? • Does the utility currently use any of above techniques for main line repairs? Page 18 of 22 Page 763 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 20 of 53 Manhole Repairs Manhole repairs consist of repairing structural defects or leakage in individual manholes and castings. The structural repair work may include: -Complete manhole replacement - Replacing castings (lid and frame) - Replacing defective adjusting rings or top segments - Spray relining the existing manhole - Grouting fissures to eliminate leakage • What rehabilitation techniques are used for manhole repairs? • What type of documentation is kept? ✓ Service Laterals Service laterals can often be the largest source of I/I to a system. Taps,joints, and locations of structural damage are common points where I/I may be introduced into the collection system. Most utilities have legally established what part(s) of the service lateral they maintain. Jurisdiction may cover the tap only, cover all construction to the property line, or cover construction all the way to the building. The utility itself may not have direct control over installation of new service laterals. Typically the municipality's building inspectors have this responsibility. What is important is that there is communication and a consistency of standards between the utility and building departments. • To what degree does the utility have responsibility for service laterals? • Does the utility have a written procedure for the approval and inspection of new construction service laterals? • Does the utility require service laterals to meet certain standards of construction? How are these standards made available to builders? • Does the utility have a procedure to actively find and remove illegal tap-ins? • What is the utility's jurisdiction related to repair/replacement of service laterals? • Does the utility include I/I originating from service laterals as part of their system evaluations? Page 19 of 22 Page 764 of.1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 21 of 53 ✓Alternative Collection Systems Alternative collection systems differ significantly from the conventional gravity sewer commonly employed to convey wastewater. Alternative systems include: grinder pump pressure systems, septic tank effluent pump (STEP) systems, small diameter gravity systems, and vacuum collection systems. Each system has its own unique operation and maintenance requirements and could be found as a subset of a system which is predominately gravity sewer or by itself as a stand-alone utility. Although each alternative system operates .� L \ ' 4 differently and has different maintenance requirements, all require a similar management system. In each system appurtenances are located at each residence, so the utility needs to have ready access, maintain i adequate spare parts, and install alarm systems to notify the utility of any problems between inspections. Grinder Pump Systems Grinder systems employ a holding tank(typically up to 100 gallons and located near an individual residence) which houses a small pump with a grinder attached. Wastewater is discharged intermittently using float controls. The collection system is comprised mostly of 11/2" and 2" PVC plastic lines. Manholes are generally not installed,but cleanouts should be installed at the ends of all lines and at critical points. Air release valves are installed at the downstream side of high points. Pressures are low. A system serving 500 homes would include 500 individual pump stations so a utility needs to have an appropriate staffing level for maintenance. A minimum of two personnel should be available. Generally speaking, a staff including two full-time employees per 1,000 stations has been found sufficient for well-designed systems. Major sources of emergency maintenance include electrical problems and grease buildup in the holding tanks,resulting in failure of the floats to activate the pumps. Corrosion within the holding tank can also be a problem. Grinding solids reduces the likelihood of solids deposition,but hydrogen sulfide may be a problem where the pressure line discharges to the treatment plant or into a gravity collection system. Pump preventive maintenance is critical and adequate spare pumps should be in inventory. Pumps and grinders may require frequent replacement and overhaul. Pump life is limited and a plan to replace all pumps should be in place. Infiltration is generally not a problem,but exfiltration may occur through deteriorated joints. Page 20 of 22 Page 765 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 22 of 53 Septic Tank Effluent Pump Systems STEP systems are similar to the grinder pump system except a septic tank replaces the holding tank and grinders are not present on the pumps. A greater range in pump types(centrifugal, progressive cavity, etc.) are common with these -- systems. Although the septic tank provides preliminary treatment and solids settlement, it is part of the collection system. Significant infiltration may occur with poorly sealed and constructed septic tanks. Lines are generally sized assuming low infiltration rates. High infiltration rates will increase pump operation and may reduce pump life. The wastewater is highly septic and can cause odor and corrosion problems where the pressure line discharges into a conventional manhole or treatment works. Proper operation and maintenance of the septic tank is essential for proper function of the collection system, so tanks should be pumped out on a set schedule. Small Diameter Gravity Sewers Like STEP systems, small diameter gravity systems use septic tanks for preliminary treatment and solids removal. However,no pumps are used. The septic tank overflows into a small diameter(4" and up)pipe placed at a moderate grade. The lower solids concentration in the wastewater results in less deposition of solids in the pipe. Cleanouts are generally used in place of manholes, and pipes are sized assuming low infiltration rates. Similar to the STEP system,the integrity and maintenance of the septic tank is a critical factor for proper operation. Vacuum Sewer Systems Vacuum systems have a central vacuum station which includes vacuum pumps,holding tanks, and pressure pumps. The vacuum pumps provide a continuous suction in the collection line. A holding tank and vacuum valve are installed near each residence. When the wastewater reaches a set level in the holding tank,the valve is opened to release a slug of liquid into the collection line. A loss of vacuum in the system will generally trigger a fault condition. Major breaks may cause the system to shut down, and leaks are difficult to locate. Once the wastewater arrives at a central vacuum station, it enters a holding tank and is pumped to the treatment facility through a force main. Page 21 of 22 Page 766 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 23 of 53 • Does the utility have control of the near-residence portions of the collection system? • Who owns the near-residence systems? • Does the utility do periodic inspections of the near-residence facilities? • What is the frequency of these inspections? • Are pressure check valves installed on pumps? • Are clean-outs installed at the end of each branch line? • Is a pipe locating system installed? • Are air release valves installed on the downstream side of high points? • Does the system have a warning alarm system at each residence? • How does the utility respond to the alarm system? • Are odor control systems are installed? *84' Page 22 of 22 Page 767 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 24 of 53 EPA Region 4 Guide to Collection and Transmission System Management, Operation, and Maintenance Programs Version 1.1 0.1ED STQTFs 2� 7th � W E2q4P O��G�` R PURPOSE&DISCLAIMER This document is the work product of the EPA Region 4,Water Protection Division,Clean Water Enforcement Branch(CWEB) and supercedes a previous draft dated September 2003(Version 1.0).This document serves as an introduction for new Region 4 inspectors in the CWEB Municipal Infrastructure Enforcement Program and contains descriptive information for utilities conducting self-assessments in the Region 4 Management,Operation,and Maintenance(MOM)Programs Project. The MOM Programs Project is conducted in compliance with EPA Policy,EPA Guidance,and Rules and Regulations promulgated under the Clean Water Act.If some statement or part of the document is not in compliance with the Act,EPA Policy,EPA Guidance or the Rules and Regulations,then it should not be construed as conveying rights not conveyed by the Clean Water Act, EPA Policy,or the Rules and Regulations. October 2011 Page 768 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 25 of 53 TABLE OF CONTENTS Contents INTRODUCTION 1 SYSTEM PROFILE AND PERFORMANCE SUMMARY 4 MANAGEMENT PROGRAMS 6 I. Organization 6 a. Organizational Chart 6 b. Relation to Other Municipal Functions 6 2.Training 6 a.Technical Training Program 6 b. Skills Training Program 6 c. Safety Training Program 7 3. Safety 7 a. Safety Authority 7 b. Confined Space Program 7 c. General Safety Procedures Program 7 d.Traffic Management Procedures Program 7 e. Lock-Out/Tag-Out Program 7 f. Safety Equipment Program 7 g. Safety Performance Program 8 4.Information Management Systems(IMS) 8 a. Management Programs IMS 8 b. Operation Programs IMS 8 c. Maintenance Programs IMS 8 d. Customer Service IMS 8 5. Engineering 8 a. Collection and Transmission System Plans Program 8 b. System Inventory Program 9 c. Mapping Program 9 d. Sewer System Design Program 9 e.New Construction and Rehabilitation Inspection Program 9 f.Acquisition Considerations Program 9 Page 769 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 26 of 53 g.Continuous Sewer System Assessment Program 9, h. Infrastructure Rehabilitation Program 11 i. System Capacity Assurance Program 11 6. Overflow Tracking 12 a. State Agency Reporting Program 12 b. Local Agency Reporting Program 12 c.Records Management Program 12 7. Financial Analyses 12 a. Cost Analysis Program 12 b. Capital Improvement Financing Program 12 c. Budget and Customer Rate Program 13 8. Equipment and Supplies 13 a. Spare Parts Inventory Program 13 b.Equipment and Tools Inventory Program 13 c. Vehicle Repair Program 13 9. Customer Service 13 a. Complaint Management Program 13 b.Public Information Program 13 c.Public Education Program 13 10.Legal Support 14 a.Inter-Jurisdictional Agreement Program 14 b. Sewer Ordinance Program 14 11. Water Quality Monitoring 14 a.Routine Monitoring Program 14 b.Investigative Monitoring Program 14 c.Impact Monitoring Program 14 12. Contingency Plan for Utility Infrastructure 15 a. Contingency Planning Program 15 b.Response Flow Diagram 16 OPERATION PROGRAMS 17 1. Pump Station Operation 17 a.Preventive Operation Program 17 b. Reactive Operation Program 17 ii Page 770 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 27 of 53 2. Pretreatment Program 17 3. Corrosion Control Program 17 4. Fats,Oils,and Grease Control Program 17 5. Service Connection/Disconnection Program 18 6. Private Haulers Program 18 7. Line Location Program 18 MAINTENANCE PROGRAMS 19 1. Pump Station Preventive Maintenance 19 a.Pump Station Repair Program 19 b. Electrical Maintenance Program 19 c.Mechanical Maintenance Program 19 d. Physical Maintenance Program 19 2. Gravity Line Preventive Maintenance 19 a. Routine Hydraulic Cleaning Program 19 b. Routine Mechanical Cleaning Program 19 c.Root Control Program 20 d.Manhole Preventive Maintenance Program 20 3. Air Valve Preventive Maintenance Program 20 4. Maintenance of Way 20 a.Maintenance of Rights-of-Way and Easements Program 20 b. Street Paving Monitoring Program 20 5. Reactive Maintenance Program 20 • i i i Page 771 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 28 of 53 INTRODUCTION A utility should develop an appropriate, comprehensive Management, Operation and Maintenance (MOM)Program for the sewerage infrastructure (sewer system and wastewater treatment plant)which it owns and operates. A comprehensive MOM Program is comprised of individual management, operation, and maintenance programs, each of which: :> is specific to, and tailored for,the utility's infrastructure; • has a written purpose explaining why the program is needed; has specific written goal(s) establishing the accomplishment(s) desired for the current fiscal year; • has the details of the activities and procedures that are followed to implement the program written down in the form of Standard Management Procedures(SP), Standard Operating Procedures (SOP), and/or Standard Maintenance Procedures(SMP)that are used by the utility's personnel; ➢ is implemented by well-trained personnel; has established appropriate performance measures which are tracked by management; and, r� has a written procedure requiring periodic review, evaluation, and any necessary revision. An important concept is that MOM programs are utility-specific. Most, if not all,of the programs described in this guide are based on actual programs observed at proactive utilities. However,utilities may have different titles for the various MOM programs described in this guide and may have them organized very differently. Some utilities may be organized in a way that they consolidate some of the MOM programs described in this guide,or they may exclude part of a program described in this guide because of justifiable circumstances. Utilities may also have additional MOM programs that are not contained in this guide. Tailored to the Utility The utility should have programs tailored to match its geographic,physical,and climatic conditions; level of complexity;infrastructure configuration;and level of sophistication.Utilities may also have a number of their MOM programs implemented through a managed contract rather than by their own trained personnel. Program Purpose The purpose of a given MOM program is the reason why the program is needed and why it exists. Example: The purpose our utility's smoke testing program is to identify sources of inflow our sewer system that need to be eliminated so that we can regain some of our peak flow capacity. Program Goal The individual program goal(s)establishes the accomplishments desired for the given MOM program during the upcoming fiscal year. Example:The goal our smoke testing program for this fiscal year is to reclaim system peak 1 Page 772 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 29 of 53 capacity, and to reduce treatment plant hydraulic loading by identifying sources of inflow to the system by conducting investigations in the ABC and DEF sewersheds. This goal will be accomplished in a cost-effective manner using our personnel and by using a contractor. Program Documentation The program documentation specifies, in writing,the specific details of the activities and procedures that personnel follow to implement the program.Program documentation should be maintained in a central location and made available to all personnel. Example: Our utility has a long-term,ongoing, smoke testing program. The program priorities and standard operating procedures are contained in a manual entitled"Smoke Testing Program for Utility X." Implemented by Trained Personnel Training programs are established and followed to ensure that utility personnel are well-trained to implement each program and successfully achieve each program's goals. Example:All personnel assigned to our smoke testing activity receive three hours of basic training followed by eighty(80)hours of on-the-job training to assure competency. Our contract with outside sources to conduct smoke testing requires the contractor to follow our standard operating procedures. Performance Measures Appropriate performance measures should be established for each program and reviewed at minimum on an annual basis. Example: During this fiscal year,the performance goal is to smoke test 200,000 lineal feet of gravity sewer in two sewersheds selected according to our priority procedures. Last year,we exceeded our performance goal of 178,000 lineal feet of gravity sewer by smoke testing 193,000 lineal feet.As a result,623 defects were identified and passed on to our rehabilitation and private service lateral programs for correction. Periodic Evaluation An evaluation by utility management should occur for each program,annually at minimum,to evaluate how well a program accomplished the program goals established at the beginning of the period and to determine whether the program, as presently implemented, is using the most efficient approach. Remedies should be identified and scheduled to correct any deficiencies. Questions the evaluation should answer are: ➢ Are there program design,resource or implementation deficiencies that keep the program from achieving its performance measures? Are these program deficiencies leading to sanitary sewer overflows,permit violations or other 2 Page 773 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 30 of 53 Clean Water Act violations? ➢ Are there program deficiencies leading to decreased customer service and/or unwarranted deterioration of utility assets? Are there changes that should be made to the program that will make its implementation more efficient, thereby conserving resources for better implementation of other programs? Example: The smoke testing program has yielded good results during the past four years. Following our priority criteria,most of the significant inflow problems have been eliminated. Next year the program will be reduced by 25%and the resources applied to our maintenance of way program. Peak flows will be monitored at key locations to determine if this reduction in the smoke testing program will need to be reversed in the future. Additionally, we are conducting a cost analysis to determine whether we should contract out for all smoke testing work in the future. 3 Page 774 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 31 of 53 SYSTEM PROFILE AND PERFORMANCE SUMMARY A proactive utility will maintain a profile of its system as a basis for explaining its situation to regulatory agencies,the public,and when networking with other utilities. A profile typically contains basic population and inventory information as well as a recent system performance summary. An example of a system performance summary is provided on the following page. Population Served: Number of Customers: Number of Treatment Plants: Total Wastewater Design Treatment Capacity: Total Volume of Wastewater Treated: Miles of Gravity Sewers: Number of Manholes: Number of Inverted Siphons: Number of Pump Stations: Miles of Force Main: Number of Employees: Annual Capital Improvement Budget: Annual Operation and Maintenance Budget: ... Total Annual Operating Budget: 4 Page 775 of 1707 n CD N i . N) N System-Wide MOM Programs Recent Performance Summary Performance Measures for Previous 12 Months Year Month A.Number of Customer Complaints B.Number of NPDES Permit Violations C.Number of Capacity-Related Overflows D.Number of Maintenance-Related Overflows O 0 E.Number of Operations-Related Overflows s✓ F.Number of Blockages N C.Number of Cave-Ins ' N H.Number of Pump Station Failures CJ7 '13 I.Peak Flow Factor at Treatment Plant(1 hour high/dry month U'1 cp avg.) — m J.Monthly Average Treatment Plant Flow Rate(gal/capita/day) V O K.Monthly High One Day Treatment Flow Rate(gal/capita/day) O CD L.Number of By-Passes at Treatment Plant 0 v o M.Volume of Treatment Plant By-Passes(gal) TI N.WWTP Weekly Average Influent BOD(mg/L) (r 0 0 O C) CD O O O O N O -D CD W N 5 0 0 01 0) Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 33 of 53 MANAGEMENT PROGRAMS 1. Organization a. Organizational Chart An organizational chart clearly depicts all units in the organization, the lines of authority between the various organization units, a description of the functions of each of the organization units, the title and duties of each position in the organization units and an indication of whether or not each position is currently budgeted and filled. b. Relation to Other Municipal Functions An organizational chart clearly depicts the relationship of the sewerage utility to other municipal functions such as public works, streets and drainage,building inspection, building permits, and public health. There is a mechanism for updating the chart in manner timely to changes which may occur in the organization. 2. Training a. Technical Training Program This program specifies requirements(curriculum) for initial and refresher training to ensure each employee has a level of knowledge, commensurate with duties, of the overall functions of the utility's infrastructure. This program also includes outside technical training and networking opportunities, such as conferences and seminars, that are made available to employees. The program includes the extent to which employee certification,at either the State or the utility's organization level,is required as a basis for obtaining or maintaining a position. Records of technical training are maintained and the degree to which completed technical training is tied to promotion and pay is specified. Finally,the program specifies the technical training required before an employee is permitted to undertake specific work assignments or tasks. b. Skills Training Program This program specifies requirements(curriculum)for initial and refresher training to ensure each employee has a level of knowledge,commensurate with duties,of the specific equipment to be used and the procedures to be followed in carrying out duties. This program should include outside skills training opportunities, such as manufacturers' or vendors' training workshops,that are made available to employees. 6 Page 777 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 34 of 53 The program includes the extent to which employee certification, at either the State or the utility's organization level, is required as a basis for obtaining or maintaining a position. Records of skills training,whether formal or on-the-job apprenticeship, are maintained and the degree to which completed training is tied to promotion and pay is specified. Finally,the program specifies the skills and on-the-job training required before an employee is permitted to undertake specific work assignments or tasks. c. Safety Training Program This program specifies requirements(curriculum) for initial and refresher training to ensure each employee has an adequate level of knowledge regarding on-the-job safety. The program includes the extent to which employee safety certification at the State or at the utility's organization level is required as a basis for obtaining or maintaining a position. Records of safety training, including on-the-job safety meetings, are maintained. Finally,the program specifies the safety training required before an employee is permitted to undertake specific work assignments or tasks. 3. Safety a. Safety Authorit A Safety Authority(whether a safety department, safety committee, safety officer, or similar mechanism)is present to establish utility safety policy, oversee compliance,and maintain the overall Safety Program.Program maintenance includes specifying safety resources needed for utility activities, assuring record of appropriate standard reporting forms, and establishing a Safety Review Board if appropriate. h. Confined Space Program This program provides marking for confined spaces,and uses a permitting system and written standard procedures for confined space entry. c. General Safety Procedures Program This program provides instruction in defensive driving, first aid, CPR, personal sanitation, personal protection clothing, and similar general work-related safety issues. d. Traffic Management Procedures Program This program provides for standard traffic management techniques,off-hour scheduling of line work,and coordination with law enforcement. e. Lock-Out/Tag-Out Program This program provides signs on equipment involved in the program, limitation to authorized personnel,required tag information, and permit requirements. f. Safety Equipment Program This program assures the availability of appropriate safety equipment such as tripods and hoists,well-calibrated atmospheric testing equipment, self-contained breathing apparatuses, lights and barricades,exhaust fans, and personal protective clothing. 7 Page 778 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 35 of 53 g. Safety Performance Program This program tracks parameters such as number of injuries, lost days, and workman's compensation claims to be used by management to assess Safety Program effectiveness. 4. Information Management Systems (1MS) a. 'Management Programs 1MS This information management system enables utility management to adequately evaluate operation,maintenance, customer service (complaint response), and system rehabilitation activities so that overall system performance can be determined and utility planning can be conducted. b. Operation Programs IMS This information management system is used to track scheduled operational activities and to enhance operational performance.The system ensures timely production of operating reports and standardized data collection methods are used by field personnel (e.g., forms or PDA files).The system requires data review by the field supervisor and securely preserves operating records. While the system need not be computer-based, it should be capable of feeding information to the Management Programs IMS. c. Maintenance Programs IMS This information management system is used to track scheduled maintenance activities and to enhance maintenance performance. The system ensures timely production of maintenance reports and standardized data collection methods are used by field personnel (e.g., forms or PDA files).The system requires data review by the field supervisor and securely preserves maintenance records. While the system need not be computer-based, it should be capable of feeding information to the Management Programs IMS. d. Customer Service IMS This information management system is used to track reactive activities (i.e.,emergencies or customer complaints) and to enhance customer service. The system ensures timely production of complaint reports and standardized data collection methods are used by field personnel(e.g., work order forms or PDA files). The system requires data review by the field supervisor and securely preserves service records. While the system need not be computer-based, it should be capable of feeding information into the Management Programs IMS. 5. Engineering a. Collection and Transmission System Plans Program This program ensures a full set of as-built plans for the collection and transmission system are available, field crews have ready access to the plans,and a written standard procedure is present to account changes, update the plans, and supply revised versions to field crews in a timely manner. 8 Page 779 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 36 of 53 b. System Inventory Program This program ensures an inventory of the utility's collection and transmission system is present,updated, and cataloged by service area or sewershed. The inventory lists the system components with their attributes and characteristics (e.g., pipe age, pipe size,pipe material, invert elevation,pump sizes, location of inverted siphons, pump stations,manholes, etc.). c. Mapping Program This program ensures adequately detailed maps are available to be used in conjunction with the utility's MOM programs.At minimum,the maps depict the location of gravity sewer lines, force mains, air valves,manholes(by identifying numbers),pump stations, major appurtenances,and the size of pipes. d. Sewer System Design Program This program ensures all new sewer system construction will be adequately designed and constructed using specifications that assure the integrity of the infrastructure. The program includes documented design criteria (e.g., slope and bedding materials), use of standardized construction details,use of standardized materials and construction practices,a standard design review process which includes review by utility personnel for possible maintenance concerns, standardized review forms, and record keeping procedures. e. Nos Construction and Rehabilitation Inspection Program This program ensures new construction or rehabilitative work is properly inspected, and built using the utility's standard construction specifications(including use of best management practices to prevent stream pollution). The program includes use of standardized construction procedures,standardized construction testing procedures, standardized inspection and testing forms/reports, and assurance that the inspection is conducted under the authority and supervision of a registered Professional Engineer.The program also provides subsequent closed circuit television (CCTV) inspection of line construction prior to expiration of the warranty, and retention of the tapes for reference. f. Acquisition Considerations Program This program ensures prospective infrastructure is inspected and evaluated for compliance with the utility's standard design and construction criteria before it is acquired by the utility from another entity. The program includes written standard procedures to conduct the evaluation and estimate the time/cost requirements to bring the infrastructure into compliance with utility standards. g. Continuous Sewer System Assessment Program i.1 Prioritization This program prioritizes sewer service areas(i.e., sewersheds) for sewer system assessment activities. Prioritization is based upon information such as complaints, flow monitoring(including flow isolation studies),historical location of sewer overflows,pump station run times, field crew work orders, and other relevant information available to the utility. 9 Page 780 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 37 of 53 ii.)Dyed Water Flooding This program conducts dyed water testing, when appropriate,to locate sources of inflow and other illicit connections to the sewer system. The program includes written standard procedures, standard forms, performance measures, and a mechanism for including dyed water testing information in the IMS. iii.) Corrosion Defect Identification This program identifies locations within the sewer infrastructure subject to corrosion and provides for inspection of those locations for corrosion on a routine basis. The program includes written procedures for corrosion identification, corrosion identification forms,performance goals,corrosion defect analysis,and a mechanism for including corrosion defect information in the IMS. iv.)Manhole Inspection This program ensures routine inspection of manholes within the sewer system. The program includes standard manhole inspection procedures, manhole inspection forms,performance goals,manhole defect analysis, and a mechanism for including manhole inspection information in the IMS. r.) Firm.tlonitorin• This program supplies flow monitoring data to support engineering analyses related to sewer system capacity and peak flow evaluations, and to assist scheduling of sewer line maintenance. The program may include installation of an appropriate number of calibrated permanent and/or temporary flow meters, or rudimentary use of visual flow observations taken during base flow periods in wet and dry seasons. The latter option is more cost-effective for some very small utilities. Either program should include a procedure for adequate rainfall measurement,servicing meters, and a mechanism for including flow monitoring information in the IMS. vi.) Closed Circuit Television (CCTI) This program provides internal inspection of the integrity of gravity sewer lines. The appropriate number of qualified CCTV personnel and dedicated equipment,or the scope of a CCTV contract, is determined to ensure sewer inspection work is completed properly. The program includes standard operating procedures (including pre-inspection cleaning), performance measures,and mechanisms for including CCTV information in the IMS and retaining CCTV tapes. vii.) Gravity System Defect Analysis This program analyzes gravity sewer system defects.The program includes standard defect codes,written defect identification procedures and guidelines,a standardized process for cataloging gravity system defects, a mechanism for including gravity system defect information in the IMS, and training specified for personnel. viii) Smoke Testing This program identifies sources of inflow into the gravity sewer system by use of smoke 10 Page 781 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 38 of 53 testing equipment. The program includes written standard smoke testing procedures, smoke testing forms, performance goals, smoke testing defect analysis, and a mechanism for including smoke testing information in the IMS. ix.)Service Lateral Investigations This program investigates infiltration and inflow contributions and other problems originating in service laterals. The program includes written standard investigation techniques,standard investigation forms,performance goals,standard analysis procedures, and a mechanism for including service lateral investigation information in the IMS. x.) Pump Station Performance and.-Idequac•y This program permits evaluation of pump station performance and pump station adequacy. The program includes trend analysis of pump run-time meter,pump start-counter, or amperage data; historical review of the fundamental causes of pump failures; use of appropriate remote monitoring and alarm notification equipment; and a mechanism for including pump station performance information in the IMS. h. Infrastructure Rehabilitation Program This program rehabilitates gravity sewer lines, force mains, manholes, pump stations, and related appurtenances. The program includes a process for prioritizing rehabilitation, inventory of all completed rehabilitation (including a breakdown of the rehabilitation techniques used), inspection and performance measurement for all completed rehabilitation, written schedules for rehabilitation work, and a mechanism for including rehabilitation information in the IMS. i. System Capacity Assurance Program i.) Capacity.Assurance for.\eir Connections This program ensures there is adequate capacity to collect,transmit, and treat additional sewage expected as a result of prospective new sewer connections. The program is integrated into, or thoroughly coordinated with,the building permit process. It is also integrated into the Acquisition Considerations Program described above in 5(f). The program has a mechanism for including capacity assurance information in the IMS. ii.) Protocols.for Capacity Assurance The program includes, but is not limited to: use of standardized design flow rate rules of thumb(i.e.,regarding pipe roughness,manhole head losses,accuracy of distance and slope on as-built drawings,and water use);use of techniques to predict the impacts of additional flow(i.e., use of a hydraulic model of gravity system,pressure system,and other appropriate techniques); and use of flow metering to confirm mathematical estimations of existing peak flow.The program requires certification of adequate capacity by a registered Professional Engineer,and includes an IMS mechanism for integrating analysis from this program with information on infiltration/inflow reduction activities. 11. Page 782 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 39 of 53 6. Overflow Tracking a. State Agency Reporting Program This program includes written standard operating procedures which clearly define the minimum State Agency reporting requirements for events where sewage leaves the infrastructure before treatment,and the steps utility personnel must follow to meet or exceed those reporting requirements. b. Local Agency Reporting Program This program provides secondary notice to the public and to other appropriate organizations (e.g.,downstream utilities with water intakes and local public health authorities) when an overflow presents an imminent and substantial threat to public health or the environment. The program includes written criteria for making this notice, procedures for notifying news media and posting notices at stream locations, and may also prepare an annual summary report available to the public. c. Records Management Program This program tracks all events where sewage leaves the utility's collection or transmission system before treatment(i.e., overflows to land, directly to waters,or indirectly to waters by storm drains or other paths).The program uses standardized forms which record,at minimum, the following information for response and inclusion in the IMS: ❖ Location of the discharge ❖ Name of the receiving water and description of the pathway(e.g., storm drain) ❖ Estimation of the discharge volume and the method of estimation ❖ Description of the system component that is source of the discharge ❖ Date and time the discharge started and stopped ❖ Root cause, or suspected root cause, of the discharge ❖ Steps taken to eliminate the discharge and steps taken to prevent reoccurrence. 7. Financial Analyses a. Cost .Analysis Program This program regularly analyzes and projects future utility management, operations, and maintenance costs needed to properly implement these utility programs. The cost analyses include, at a minimum: overhead, labor and equipment, financial impacts of outsourcing certain activities, overtime, and the financial impacts imposed by organizational departments or agencies outside the utility. Cost analyses are performed for all management, operations, and maintenance equipment and the capital infrastructure investment. Cost analyses incorporate life cycle depreciation and establish cost-effective points for replacement. The program has a mechanism for including such replacement points in the IMS. b. Capital Improvement Financing Program This program analyzes,projects,plans and finances capital improvement needs established through proper engineering study. Capital improvement financing is planned using a five (5) year planning horizon with annual updates. 12 Page 783 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 40 of 53 c. Budget and Customer Rate Program This program establishes the annual utility budget and recommends customer rates. The program assures that the budget and funding provided by customer rates will meet the cost and capital financing needs set by programs 7(a)and 7(b) above. 8. Equipment and Supplies a. Spare Parts Insentory Program This program ensures proper management of the utility spare parts inventory including spare pipe.The program includes adequate parts storage facilities, identification and retention of an adequate number of critical spare parts (i.e.,those which are difficult to obtain quickly but critical to proper operations), control of access to spare parts, an organized system for inventory management(either manual or computerized), arrangement with local vendors for common parts, and specification of spare parts to be carried on vehicles. b. Equipment and Tools Inventory Program This program ensures proper management of the utility equipment and tools inventory.The program includes adequate equipment and tools storage facilities,control of access to equipment and tools, an organized system for inventory management(either manual or computerized), and specification of equipment and tools to be carried on vehicles. c. Vehicle Repair Program This program ensures proper management of utility vehicles.The program includes provisions for vehicle maintenance and vehicle repair.Performance measures for the program will consider turn-around time, cost factors, contract maintenance, and the life cycle cost analysis performed for vehicles. 9. Customer Service a. Complaint 1lanagement Program This program ensures proper complaint management. The program includes written standard management procedures for dispatchers (i.e., dispatch priorities,work order generation,and standardized complaint and problem codes). The program uses an organized record keeping procedure(including the use of standardized forms)which facilitates tracking work orders and follow-up with customers,and uses a mechanism to evaluate response performance and supply this information to the IMS. b. Public Information Program This program communicates utility activities which may closely impact the public(e.g., smoke testing,major construction or maintenance, or emergency maintenance), and ensures communication of activities which may coincide with those of other departments and agencies(e.g., street paving). c. Public Education Program This program educates the public and solicits support regarding issues such as service lateral maintenance, grease management, food disposals, inflow sources, 13 Page 784 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 41 of 53 maintenance/rehabilitation needs requiring increased rates,and problems caused by basement sump pumps. 10. Legal Support a. Inter-Jurisdictional Agreement Program This program develops,negotiates, and enforces agreements with neighboring utilities which send the utility flow or with major volume sewer customers.The program ensures that the agreements require the second party to have proper management, operation,and maintenance programs so the utility's infrastructure is not stressed by problems originating across jurisdictional boundaries. The program also ensures the agreements address flow-based capacity issues, specify the life of the agreement,have credible provisions for enforcement, and have provisions for modification. b. Sem er Ordinance Program This program develops,revises, and amends sewer ordinances as needed to support the proper management,operation, and maintenance of the utility. The program provides adequate legal authority for the utility regarding sewer use,grease management,pretreatment,private service laterals, sump pumps and roof drains,private haulers,recovering costs of damage to utility infrastructure, and other legal authorities as required. Legal support is provided for case work and guidance for utility staff. 11. Water Quality Monitoring a. Routine Monitoring Program This program determines the existence of unpermitted discharges originating at locations where sewers cross waterways or at other isolated or remote sewer locations. The program includes scheduled sampling during dry weather periods from a network of monitoring stations. The program also includes a map of the sampling network,and formally establishes sampling frequency, sampling parameters (i.e., fecal coliform and others), standard sampling procedures, quality assurance/quality control procedures, and a mechanism for including program information in the IMS. h. Ing estigath e\lonitoring Program This program determines the source of industrial, commercial, or sanitary wastewater resulting from cross connections with the stormwater drainage system,and typically activates through complaints or discovery by operations personnel. The program has formally established sampling parameters (i.e., fecal coliform and others), standard sampling procedures, quality assurance/quality control procedures, and a mechanism for including program information in the IMS. c. Impact Monitoring Program This program determines the impact of pollution resulting from discharges occurring within the utility infrastructure before treatment. Combined with the reporting programs described in Overflow Tracking(6) above,this program assists the utility,regulatory authorities, and public health authorities determine the appropriate response to protect health and/or the environment.The program has formally established sampling parameters (i.e., fecal colifonn 14 Page 785 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 42 of 53 and others), standard sampling procedures, quality assurance/quality control procedures, and a mechanism for including program information in the IMS. 12. Contingency Plan for Utility Infrastructure a. Contingency Planning Program This program develops and modifies contingency plans for the sewer system and the treatment facilities that will be implemented during emergency situations.The planning process includes a preparedness committee of senior and experienced management and field personnel. A system overview is conducted to determine vulnerability to a variety of events which may be due to utility failures, natural causes, or failures caused by another party. Based upon these hypothetical events and past experience taken from root cause failure information in the IMS, prediction system component failure is made. Strategies to timely repair or overcome such component failures are developed, and the six(6)major contingency plan components are available in writing:public notification,agency notification, emergency flow control, emergency operation and maintenance,preparedness training, and water quality monitoring (described in 11(c)above). i.) Public.' otificatiott The public notification component includes a set of criteria, developed with input from local public health authorities,which are used as a basis for initiating public notification; a step-by-step procedural flow diagram; a list of manager names and phone numbers; a plan for regular business hours,off-hours, weekends, and holidays; a list of Public Contacts with phone numbers; identification of managers authorized to give statements; and pre-scripted news releases. ii.) .-tgencr.l otification The agency notification component includes a set of criteria, developed with input from appropriate local, State, and Federal authorities,which are used as a basis for initiating agency notification; a step-by-step procedural flow diagram; a list of manager names and phone numbers;a plan for regular business hours,off hours,weekends,and holidays;a list ofAgency Contacts with phone numbers;identification of personnel authorized to contact agencies;and copies of standard reporting forms used by the agencies. iii.) Entetgencp Flow Control The emergency flow control component is used to reduce overflow volumes and pollution where possible. The component includes a set of criteria which are used as a basis for initiating emergency flow control procedures; a step-by-step procedural flow diagram; a list of manager names and phone numbers;a plan for regular business hours, off-hours, weekends,and holidays; a list of Emergency Flow Control Contacts with phone numbers; identification of personnel authorized to initiate the emergency flow control program; and standard emergency flow control reporting forms. Flow control activities may include flow re-routing, flow diversion,household flow reduction and advisories, commercial flow reduction and advisories, water pressure reduction and advisories, or use of pretreatment program protocols set forth in permits for 15 Page 786 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 43 of 53 significant industrial users. The initiating criteria,reporting forms and report formats should be developed in cooperation with significant industrial users and appropriate local, State, and Federal authorities. ir.) Emergency Operation and Maintenance The emergency operation and maintenance component includes a set of criteria which are used as a basis for initiating emergency operation and maintenance procedures; a step-by-step procedural flow diagram; a list of manager names and phone numbers; a plan for regular business hours, off-hours,weekends, and holidays; a list of Emergency Operation and Maintenance Contacts with phone numbers; identification of personnel authorized to initiate emergency operation and maintenance,procedures; and standard reporting forms. The initiating criteria,reporting forms, and report formats should be developed in cooperation with utility's insurance representatives, State and Federal emergency management agencies, and the State regulatory authority. Further, development of the emergency operations and maintenance component should include analyses of the need and use of stand-by equipment(prearranged rentals), stand-by contractors, and access to critical spare parts. i'.) Preparedness Training The preparedness training component ensures that all personnel are fully aware of procedures and able to efficiently implement the Contingency Plan.The preparedness training component includes specialized training courses, field trials, and special emergency situation safety training. b. Response Flow Diagram This diagram includes the roles of senior management and field personnel and shows the relationship of the six(6)major contingency plan components:public notification, agency notification,emergency flow control,emergency operation and maintenance,preparedness training, and water quality monitoring. 16 Page 787 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 44 of 53 OPERATION PROGRAMS 1. Pump Station Operation a. Preventive Operation Program This program ensures reliable operation of the transmission system through use written standard operating procedures available for both manned and unmanned stations. Procedures may include reading and recording information from pump run-time meters, or start counters, or taking amperage readings;recording wet well conditions and grease accumulation;checking and resetting(as necessary)wet-well set points; checking and recording system pressure; checking remote monitoring and alarm equipment components; checking operation of alarms and stand-by power;and reporting maintenance needs.The program has established schedules, routes,priorities,standard forms,performance measures, and a mechanism for including program information in the IMS. b. Reactive Operation Program This program ensures timely response to atypical situations in the transmission system through use of written standard operating procedures available for both manned and unmanned stations. Procedures may include initiating auxiliary power with portable generators,installing portable pumps during high flow, or initiating the Contingency Plan. The program has established standard forms and reporting procedures,performance measures,and a mechanism for including program information in the IMS. 2. Pretreatment Program This program ensures that operation of the utility's treatment facility is protected from pollutant pass-through or interference. If a utility has industrial or commercial users it may have this program which includes industrial user identification,permitting, monitoring and inspections, enforcement,and other components.Personnel involved with the utility pretreatment program will have frequent communication with operation and maintenance personnel to detect possible pretreatment permit violations. The program has standard operating procedures,performance measures, inspection schedules,and a mechanism for including program information in the IMS. 3. Corrosion Control Program This program provides for inspection of the utility infrastructure for corrosion caused by hydrogen sulfide or other corrosives,the development and implementation of site-specific corrosion control measures, a monitoring program to evaluate corrosion control measures,program performance measures, and a mechanism for including program information in the IMS. 4. Fats, Oils, and Grease Control Program This program prevents fats,oils,and grease from entering the utility infrastructure,therefore preserving sewer capacity,prolonging the infrastructure life,reducing overflow events,and saving the utility maintenance costs. The program includes a grease control ordinance, grease trap and interceptor design standards,permitting and inspecting commercial grease traps and interceptors,a credible enforcement component,a public education component for residential sources, performance measures, and a mechanism for including program information in the IMS. 17 Page 788 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 45 of 53 5. Service Connection/Disconnection Program This program includes written standard procedures for new sewer tap installation or for sewer disconnection;inspection of all new service connections to, or disconnections from,the utility sewer;a credible enforcement program;performance measures;and a mechanism for notifying personnel in the Mapping Program or including program information in the IMS. 6. Private Haulers Program , This program issues permits to private commercial or septic tank waste haulers discharging to the utility,and includes written standard operating procedures for inspection/sampling of the haulers, a credible enforcement program,program performance measures,and a mechanism for including program information in the IMS. 7. Line Location Program This program responds to requests for utility sewer line locates,and includes written standard line location procedures, defined prioritization to assist scheduling, appropriate staffing and equipment for the average number of requests, standard line location procedures, standard forms, performance measures, and a mechanism for including program information in the IMS. 18 Page 789 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 46 of 53 MAINTENANCE PROGRAMS 1. Pump Station Preventive Maintenance a. Pump Station Repair Program This program is a reactive maintenance component intended to repair pump stations that are currently in a state of disrepair but still cost-effective to service. The program includes established priorities for pump station repairs,maintaining an ongoing inventory of completed repairs,a work schedule for pump station repairs,and a mechanism for including pump station repair information in the IMS. Upon completion of pump station repairs, service activities are transferred to the pump station Preventive maintenance program. b. Electrical Maintenance Program This program is a component of the pump station Preventive maintenance program. The program includes an established number of crews and personnel required to perform effective electrical maintenance,written standard electrical maintenance procedures, scheduling Preventive maintenance, standard forms,performance measures, and a mechanism for including electrical maintenance information in the IMS. c. Mechanical Maintenance Program This program is a component of the pump station Preventive maintenance program. The program includes an established number of crews and personnel required to perform effective mechanical maintenance,written standard mechanical maintenance procedures, scheduling Preventive maintenance, standard forms, performance measures, and a mechanism for including mechanical maintenance information in the IMS. d. Physical Maintenance Program This program is a component of the pump station Preventive maintenance program. The program includes an established number of crews and personnel required to perform effective physical maintenance,written standard physical maintenance procedures, scheduling, standard forms,performance measures,and a mechanism for including physical maintenance information in the IMS. 2. Gravity Line Preventive Maintenance a. Routine Hydraulic Cleaning Program This program includes accurately determined cleaning needs, established priorities and scheduled cleaning activities, support of an appropriate number of crews and personnel, acquired necessary equipment(e.g., Jet Unit, Combination Unit, etc.), written standard hydraulic cleaning procedures, standard forms,performance measures, and a mechanism for including hydraulic cleaning information in the IMS. b. Routine Mechanical Cleaning Program This program includes accurately determined cleaning needs, established priorities and scheduled cleaning activities, support of an appropriate number of crews and personnel, acquired necessary equipment(e.g., Rodders, Bucket Machine,etc.), written standard mechanical cleaning procedures, standard forms,performance measures, and a mechanism 19 Page 790 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 47 of 53 for including mechanical cleaning information in the IMS. c. Root Control Program This program includes accurately determined root control needs, established priorities and scheduled activities, support of an appropriate number of crews and personnel, acquired necessary equipment(e.g.,mechanical,chemical,etc.), written standard root control procedures, standard forms,performance measures, and a mechanism for including root control information in the IMS. d. Manhole Preventive Maintenance Program This program includes accurately determined manhole maintenance needs, established priorities and scheduled activities, support of an appropriate number of crews and personnel, acquired necessary equipment(rings and lids, structural repair, etc.),written standard manhole maintenance procedures, standard forms,performance measures, and a mechanism for including manhole maintenance information in the IMS. 3. Air Valve Preventive Maintenance Program This program provides for inspection and maintenance of air valves located on force mains (including regular valve exercise). The program includes an established number of crews and personnel required to perform effective Preventive maintenance,written standard air valve maintenance procedures, scheduling, standard forms,performance measures, and a mechanism for including air release valve maintenance information in the IMS. 4. Maintenance of\'1 ay a. Maintenance of Rights-of-Way and Easements Program This program includes accurately determined maintenance needs, established priorities and scheduled activities, support of an appropriate number of crews and personnel (based on the number of waterway crossings and/or miles of sewer off-street),written standard maintenance procedures, standard forms,performance measures, and a mechanism for including maintenance information in the IMS. b. Street Paving Monitoring Program This program includes accurately determined monitoring needs, established priorities and scheduled activities, coordination with storm drain projects and street and highway officials, support of an appropriate number of crews and personnel,acquired necessary equipment(e.g., manhole and valve raising, etc.),written standard monitoring procedures, standard forms, performance measures, and a mechanism for including monitoring information in the IMS. 5. Reactive Maintenance Program This program provides response to customer complaints or other unscheduled system problems forwarded by dispatchers. The program includes support of an appropriate number of crews and personnel,written standard response procedures including a protocol for initiating the Contingency Plan, standard forms,collection of information in support of failure analysis, sewer map availability,performance measures, and a mechanism for including reactive maintenance information in the IMS. 20 Page 791 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 48 of 53 Useful References for Management, Operations, and Maintenance Programs The following references may be obtained from their cited sources. Documents referenced to California State University, Sacramento may be obtained by contacting: California State University, Sacramento Office of Water Programs 6000 J Street Sacramento, California 95819-6025 (Tel) 1-916-278-6142 (Fax) 1-916-278-5959 (E-mail) wateroffice@csus.edu Documents referenced to the Water Environment Federation may be obtained by contacting: Water Environment Federation 601 Wythe Street Alexandria, VA 22314-1994 USA (Member Services Center) 1-800-666-0206 (Fax) 1-703-684-2492 (E-mail)pubs(u;weforg (Internet) http://wwv, \w ef.org/TechResCatalog/marketplaces Documents referenced to the Environmental Protection Agency may be obtained by contacting either the NCEP (if in stock) or the NTIS: U.S. Environmental Protection Agency National Service Center for Environmental Publications P.O. Box 42419 Cincinnati, OH 45242 (Tel) 1-800-490-9198 (Fax) 1-513-489-8695 (Internet)http://www.epa.gov/ncepihom/orderpub.html National Technical Information Service 5285 Port Royal Road Springfield, VA 22161 (Tel) 1-800-553-NTIS (Fax Orders) 1-703-605-6900 (E-mail) orders(antis.fedworld.gov (Internet) http://wwv,.ntis.gov/ordering.htm The EPA Region 4 Guide may be obtained by contacting Region 4 directly: U.S. Environmental Protection Agency, Region 4 Water Management Division Water Programs Enforcement Branch 61 Forsyth Street, SW Atlanta, GA 30303-8909 EPA Region 4 1 08/01/05 Page 792 of 1707 Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 49 of 53 Useful References for Management,Operations, and Maintenance Programs ➢ Sewer System Infrastructure Analysis and Rehabilitation, October 1991, United States Environmental Protection Agency, EPA/625/6-91/030 • Collection Systems: Methods for Evaluating and Improving Performance, 1998, California State University, Sacramento Foundation, Rick Arbour and Ken Kerri, USEPA Grant No. CX924908-01-0 • Wastewater Collection Systems Management, Manual of Practice 7, 1998, Water Environment Federation, 601 Wythe Street, Alexandria, Virginia, 22314 • Operation and Maintenance of Wastewater Collection Systems, A Field Study Program, Fifth Edition, Volume 1, 1996, California State University, Sacramento • Operation and Maintenance of Wastewater Collection Systems, A Field Study Program, Fifth Edition, Volume 2, 1996, California State University, Sacramento • NPDES Compliance Inspection Manual, Chapters 4 and 9, September 1994, EPA 300-B-94-014 ➢ Handbook for Retrofitting POTWs, July 1989, EPA 625-689-020 • Pretreatment Compliance Monitoring and Enforcement Guidance, September 1986, United States Environmental Protection Agency ➢ Guidance for Conducting a Pretreatment Compliance Inspection, September 1991, EPA 300R-92-009 • EPA Region 4 Guide for Conducting Evaluations of Municipal Wastewater Collection System Management, Operation, and Maintenance Programs, October 30, 1996 ➢ =Available for viewing on-line at the National Environmental Publications Internet Site (NEPIS). Go to NN\\"\\ and search using the document code (e.g., 625689020). EPA Region 4 2 08/01/05 Page 793 of 1707 0 cn CD .. i . N System-Wide MOM Programs Recent Performance Summary Year Performance Measures for Previous 12 Months Month O A.Number of Customer Complaints 0 B.Number of NPDES Permit Violations D C.Number of Capacity-Related Overflows D.Number of Maintenance-Related Overflows 0 E.Number of Operations-Related Overflows 0 F.Number of Blockages CD C.Number of Cave-Ins H.Number of Pump Station Failurescn I.Peak Flow Factor at Treatment Plant(1 hour high/dry month avg.) CDD J.Monthly Average Treatment Plant Flow Rate (gal/capita/day) co 41, K.Monthly High One Day Treatment Flow Rate (gal/capita/day) cCL D oL.Number of By-Passes at Treatment Plant 0 M.Volume of Treatment Plant By-Passes(gal) -n r N.WWTP Weekly Average Influent BOD(mg/L) U) 0 0 0 C) CD O CA 0 CJ) N O F-� W Sy CQ CD O 0 -h CTI W Case 1:12-cv-24400-FAM Document 25-5 Entered on FLSD Docket 06/06/2013 Page 51 of 53 SYSTEM PROFILE AND PERFORMANCE SUMMARY A proactive utility will maintain a profile of its system as a basis for explaining its situation to regulatory agencies,the public, and when networking with other utilities. A profile typically contains basic population and inventory information as well as a recent system performance summary. An example of a system performance summary is provided on the following page. Population Served: Number of Customers: Number of Treatment Plants: Total Wastewater Design Treatment Capacity: Total Volume of Wastewater Treated: Miles of Gravity Sewers: Number of Manholes: Number of Inverted Siphons: Number of Pump Stations: Miles of Force Main: Number of Employees: Annual Capital Improvement Budget: Annual Operation and Maintenance Budget: ... Total Annual Operating Budget: Page 795 of 1707 , 1 t 1 7 ,t,:.t.,.:,.:;,,l, .^d,.,:. lowi i7 ii'liit!EiiFiGii. EFFICIENCY PERFORM A[ 1V .: •.: WASTE 0 `' r .._ a Promotes water efficient products and practices,say- Go above and beyond legal requirements.Benefits: Information geared towards municipal solid waste al N ing H2O and electricity.Partners receive recognition Reduced Reporting under Maximum Achievable and select industrial wastes(e.g.packaging,paper, F,., and use of EPA logo. Control Technology(MACT), Extended Accumula- wood pallets,batteries) Free technical assistance, N Success story:Georgia's Cobb County replaced don for RCRA Waste, and more. case studies,and public recognition/awards. N 1682 toilets with low flow saving 9.5 million gal/yr. — Success story:Rohm and Haas Electronic Mate- — Success story:Pepsi switched from corrugated to t. www.epa.gov/watersense rials replaced burner control sections with high-ef- reusable shipping, saving$44 million. o ficiency motor controllers. Saving$49,000/yr, and www.epa.gov/wasrewise D Artie Buff, 404-562-9336 K reducing energy use by 3.7 billion BTU/yr. `Rhonda Rollins,404-562-8664 r wwwdi .epa.gov/perfoniiancetrack o , Reggie Barrino,404-562-9635 Ip . c MO i ENERGY; T j4 t' y iv .f y Save money through energy efficient products and .ro eft m practices.Covers 50 product categories.In 2007, m CD program saved consumers$16 billion in energy costs.co fl,. o Success story:Marriott instituted various energy Q NATIONAL PAR" t saving techniques saving$6 million; 3M increases '•1 RESOURCE C*_ I..' - - ;h 1,� , u ,tet, FOR ENVIROI` energy efficiency 9%,saves$10 million. TION CHALL.E ; PRIORITIES y • www.cnct,kyst;Ingo Save money and energy- Manage materials more 0 Partnership with EPA that reduces the use of any it Danny Orlando,404-562-9087 efficiently through recycling and reuse. p of the 31 Priority Chemicals(e.g.Lead,Polycyclic ml. oWASTE REDUC �,� �r, �uv/ �c cD Aromatic Hydrocarbons(PAHs). }'• w�c��.rpa.�*try/re��ion4/recycle -' RESOURCE CETT 3. o Success stories: Wirerope Works eliminated – Success story:Rooms To Go's comprehensive recy� 27,000 lbs. Lead, Saving$50,000/ r. Pollution Prevention(P2) Info clearinghouse—Oncn - y line technical P2 library/casetrainingcling program grossed over$1 million in 2007. N \�w�•w.cr.t..gov/epaoswer/hazes:tste/minimize/p.nrtnct:ship.hrm studies, co courses,Topic Hubs,P2 News,State P2 Contact Dee Rodgers-Smith (Solid Waste),404-562-8688 W Dave Langston,404-562-8478 Information, Mary Beth Van Pelt(Organics),404-562-8615 hrrp://wrrc.p2pays.org Kim Clifton(E-Waste), 404-562-8477 cQ 1-800-476-8686 Steve Smith(C&D), 404-562-8501 cD '� ,, ,. T .,, ,.. 4% P. T M 4• ! fl 4 Q 9 4• 4%4 t9 1 * 1. ft * * * 4% % !t; 4 * W 9t 4 9I 9 9 4 4 9 4 S C '• .p 4} T 9: 9, 4 ti I) e 9 • e 4 W I V /�" ` 0 ,., ,,,,,. C mpltanceAssistonce �A 6 I r' ' 4 '""r'" (WI �`.6:31F1', + ...-.*; MIMt11�Mi11lI 1'"' -' * ., ` UEIYSAR :fl _ \miller semi:. 11�amte Reduction Re::ource Center SECTOR-SPECIFIC STATE POLLUTION PREY,- 4h',''..'. r VY* Make your poi , i A u RESOURCES' 0 ,W ,: COMPLIANCE AI : A �' 1`' �, '.,, k": Find all the P2 State contacts at: , COMP , q F x —http://wrrc.p2pays.org il' r`s^- ASSISTAN ,c�� voluntary Pro . t • ,r;,.,'. _._ EPA partnership programs and general P2 E " ' .,, Make sense of environmental regulations,in termi- ' www.cpa.gov/partners and www.cpa.gov/p2 ., • r" . r nology ft44. I i ' :4.) directlyrelated toyour industry.Save Ymoney Buy environmentally responsible computers 9 on compliance and reduce wastes.Sectors include: –www.epea.t.net 1 . LI 4 I chemicals,printing,auto repair,and more. j r I. Recycling opportunities for practically everything. www.epa.govlcompliance/assist anccwww.carrh91 1.c�rg or Wesley Hardegree,404-562-9629 •Best management practices/Lower plant energy bills T • • a I '+4'.i –wwwl.ecre.t.net•gy.gOV/Industry j / `""' ADDITIONAL SUCCESS"" =- k 1� f �� �' e r " • � b, 1 '` EPAs Colorado Lab—Reduces water usage 50%, EPA has over 60 voluntary programs c� _ „ to help you reduce waste, understand Savin 650,000 allons,and$1,900/ r ;F s - g g Y' a legal requirements, and save millions; _tet > ° Retail complex in Oregon uses native landscaping— ° ' with flexible, market-driven solutions. erh i,: maintenance costs reduced 80%,and water bill$2,400. ' Other companies have saved millions . T P - ,F of dollars...and so can you! Fiberglass Mfr.reduces waste acetone by 800/0,goes f INDUSTRY4 • from Small Quantity Generator(SQG) to Condition- J�.0ED STApFs N4`I'Iy .. ally Exempt Small Quantity Generator (CESQG). .7. or 4. h t �..��. , sr Cn1 Z • Profiles environmental challenges for more – Dow reconditions steel drums,Saves$2.3 million, ! z t,''-, 7 than 35 manufacturing,transportation and * ° I Q' g p conserves 7.8 million lbs of steel. f 0 Z3 �_ • _voli ,,, agricultural sectors.Covers typical operations, Seydel's(textiles)reduction&re-manufacturing • a . .vi PRo-1*-°�\ • - pollutants, regulations, P2 opportunities,corn- A mon environmental violations,and voluntary efforts generates$518,000 in revenue. - ! • initiatives. — Institute for Local Self-reliance(ISLR)decon- • - www.cpa.gov/compliance/srcrornotchooks.htlttl structs/recycles home,nets$7,400 in materials. ' • 61 Forsyth St. Atlanta,GA 30303 j P www.epa.gov/rcgion4 ^ Mention of-trade names,products,or services does not convey " For More Information Contact ;11 W official EPA approval,endorsement,or recommendation. . " Waste Reduction Resource Center I 0, 1-800-476-8686 Case 1:12-cv-24400-FAM Document 25-6 Entered on FLSD Docket 06/06/2013 Page 1 of 8 APPENDIX D Capital Projects Work Plan The Capital Projects Work Plan consists of this narrative and three exhibits: The projects' descriptions attached as Exhibit D-1 (including the separate list of Asbestos Cement force mains that make up Project 4.9 and the separate list of individual pump station improvement descriptions that make up Projects 5.14 through 5.18 inclusive);the projects' schedules with milestones attached as Exhibit D-2; and the projects' cost schedule attached as Exhibit D-3. Although the costs of individual projects (identified with a unique project number) are in 2013 dollars,the total cost of individual projects reflect a two percent(2%) annual inflation rate commencing in FY '14-'15. Miami-Dade County's Water and Sewer Department("MDWASD"or"the Department") held three(3)public workshops on September 24, 25 and 27, 2012 in the North, South and Central areas of the County,respectively,to receive community input on the capital improvement projects. The Department also solicited written comments on its website. The Department considered the public's comments prior to finalizing the list of capital projects shown in Exhibit D-1. In establishing the schedules for the Capital Projects Work Plan shown in Exhibit D-2, MDWASD took into consideration operational and project implementation factors which include sequencing projects to keep the system operational and time to design,procure, construct and commission the projects. These schedules reflect the need to maintain the operational viability of the Department's wastewater collection,pump stations,transmission,treatment and disposal systems in a manner Page 798 of 1707 Case 1:12-cv-24400-FAM Document 25-6 Entered on FLSD Docket 06/06/2013 Page 2 of 8 that will minimize service interruptions, sanitary sewer overflows or non-compliance with effluent standards. The sequencing involves limiting the number of functional components that are out of service at one time at each of the plants and ensuring that flows can be directed away from plants with limited capacity due to repair and replacement work. This means that the work must be sequenced among the three plants as well as within each of the plants. Many of the projects must be done during the dry season when average daily flows are low, so that fact also extends the schedule for plant repairs. For the purpose of establishing priorities,the Department factored the criticality of each individual project in the context of public health, welfare and safety, operational constraints and environmental significance. Based on this rationale, most of the collection,transmission and pump station projects have been assigned similarly high priorities and are scheduled to commence at the start of FY '13 -'14. A major exception to these is the Government Cut project. Phases 1 &2 are currently budgeted and under construction. In addition,the preliminary design of Phase 3 is currently underway and is scheduled for completion during FY '12 - '13. As shown on Exhibit D-2 of this work plan, almost all of the identified wastewater collection and transmission system projects, together with the wastewater pump stations system projects, are front-loaded and scheduled for completion within the first five years of the Consent Decree. The sole exceptions are the Collection System I/I Repairs project and the Replacement of Asbestos Cement Force Mains project. The former is part of an on-going program for which we are proposing funding throughout the life of the Consent Decree. Note that the Collection System I/I Repairs project which includes inspection of approximately six thousand (6,000) miles of pipe will be performed concurrently with all other work. The Asbestos Cement Force 2 Page 799 of 1707 Case 1:12-cv-24400-FAM Document 25-6 Entered on FLSD Docket 06/06/2013 Page 3 of 8 Main project consists of the replacement of sixty-six (66) individual force mains which are projected to be completed by the end of the sixth year. The schedule of each project includes time for engineering design,permitting, procurement and construction. Although the schedule allocates permitting time of one(1) year for each project, the actual time to obtain a permit will vary depending on the type and location of the project. For projects that are located within a municipality,MDWASD or its contractor must obtain a municipal building permit and has no control over each municipality's requirements and review time for issuing a permit. Additionally,there may be several types of permits required, including electrical, mechanical and structural permits. Permits are normally obtained as part of the design process so that construction bids will reflect the conditions imposed by permitting authorities for maintenance of traffic, allowable working hours, and site restoration requirements. Allocating one year should be sufficient time for obtaining all permits regardless of where the project is located. With regard to procurement,MDWASD intends to accelerate the County Commission's internal approval process but must comply with Florida's competitive bidding laws. Scheduling of capital projects associated with the three(3)regional treatment plants presents the greatest challenge inasmuch as taking units and/or processes out of service needs to be done in a way that does not adversely affect the operational capacity of the plants. For this reason, a large number of these projects needs to be sequenced in a fashion wherein the unit or process is placed out of service during the dry season,normally from the end of November to the end of May. Another scheduling variable taken into consideration is the need to divert flows from one treatment plant to another while work that limits the plant's hydraulic capacity is being 3 Page 800 of 1707 Case 1:12-cv-24400-FAM Document 25-6 Entered on FLSD Docket 06/06/2013 Page 4 of 8 performed. Finally,the State's Ocean Outfall Legislation is another factor to consider in scheduling the work at the Central and North District WWTPs. The legislation may impact the work schedule. The Ocean Outfall Legislation currently requires diverting almost all flows from the outfalls by 2025. This, in turn, requires adding at least High Level Disinfection(filtration and disinfection)to all of the North and Central District flows. In addition,the legislation requires significant reuse of these flows. Existing site constraints may well result in the need to construct one or more entirely new plants in more westerly locations,thereby potentially requiring alterations to the collection system. This Capital Projects Work Plan assumes that the existing plants will be overhauled in their present locations, an assumption that may need to be altered as the outfall plan develops. It is also possible that changes to the Ocean Outfall Legislation will be made during the next or future legislative sessions, and such changes could also impact the Work Plan. Although design activities for many of the treatment plants' projects are scheduled to commence shortly after the Effective Date of the Consent Decree,there are several projects whose completion extends beyond 10 years after the Effective Date. The following are explanations for the proposed length and completion dates of these specific projects. Project 1.3 - SDWWTP Oxygenation Train Rehabilitation This project does not start at the beginning of the Consent Decree because recent tank cleanings,minor structural rehabilitation,mixer replacements for energy efficiency and process modifications have improved the conditions of these units. However, the oxygenation trains will require extensive maintenance during the proposed life of the Consent Decree. The construction phase for the extensive rehabilitation of these units is scheduled for mid-2018,which is well 4 Page 801 of 1707 Case 1:12-cv-24400-FAM Document 25-6 Entered on FLSD Docket 06/06/2013 Page 5 of 8 before deterioration would be severe enough to result in tank failure or compromise the treatment process. Construction will require seven (7)years for completion because the tanks are a critical part of secondary treatment that is highly sensitive to hydraulic conditions. Therefore, it is advisable for these units to be out of service during the dry weather periods of the year. Additionally, in order to ensure that a tank can be fully rehabilitated during the dry season, and that firm plant capacity is maintained at all times, only one tank will be rehabilitated per year. Projects 2.5 and 2.6—Central District WWTP Plants 1 and 2 Oxygenation Train Rehabilitation The construction phase of these projects will require six (6)years for completion because the tanks are a critical part of the secondary treatment that is highly sensitive to hydraulic conditions. Therefore, it is only advisable for these units to be out of service during the dry weather periods of the year. Additionally, in order to ensure that a tank can be fully rehabilitated during the dry season, and that firm plant capacity is maintained at all times, only one (1)tank will be rehabilitated per year. Projects 2.7, 2.8, 2.9 and 2.10—Central District WWTP Plants 1 and 2 Secondary Clarifiers and Return Sludge Pump Stations Currently, fibrous and other material accumulations that include rags, paper, plastic and hair, and solids deposition result in failure of the sludge collection mechanism in the secondary clarifiers. The construction phases of the secondary clarifier projects are not scheduled to start prior to the construction and full operation of the Central District WWTP's headwork project since this project will target rag and solids removal upstream of the secondary clarifiers. Under normal circumstances it would be advisable to have only one (1)clarifier out of service per plant at the Central District WWTP. However,the physical pairing of a return sludge 5 Page 802 of 1707 Case 1:12-cv-24400-FAM Document 25-6 Entered on FLSD Docket 06/06/2013 Page 6 of 8 pump station with the corresponding secondary clarifiers at the Central District WWTP dictates that two(2) clarifiers and their paired pump station be rehabilitated at the same time for ease of construction. However,this pairing is also required in case the removal and replacement of badly corroded return sludge pipes from one clarifier causes damage to the adjacent clarifier's structure and return sludge pipes. The construction phase for each pair of clarifiers and their shared return sludge pump station will take approximately one(1)year. Since there are sixteen (16) secondary clarifiers and eight (8)return sludge pump stations at the Central District WWTP, the full construction phase of these two (2)projects is eight(8)years. Projects 2.14 and 2.15—Central District WWTP Plant 1 and 2 Digesters The level of deterioration and complexity of the anaerobic digesters requires that each cluster of four(4) digester tanks be taken completely out of service for extensive masonry and steel structural repairs; complete replacement of pipes, valves, sludge mixing equipment,heat exchangers and pumps; demolition of failed floating covers and installation of new covers. Since these units were built at different times,the six(6) digester clusters reflect different design and construction methods. Accordingly, the rehabilitation of each cluster will require an individual design effort. For these reasons, the construction phase of each digester cluster has been conservatively estimated to take the better part of two (2)years. It must be emphasized that this is an estimated construction time based on similar level of work being performed on each cluster. Until a detailed design for the rehabilitation required for each digester cluster is sufficiently complete, a more realistic construction time estimate for each cluster will not be available. The current estimate for the entire construction phase of all digesters is ten(10)years, with only one(1) digester cluster taken out of service at a time. 6 Page 803 of 1707 Case 1:12-cv-24400-FAM Document 25-6 Entered on FLSD Docket 06/06/2013 Page 7 of 8 Projects 3.2 and 3.5 —North District WWTP Primary and Secondary Clarifiers Currently, fibrous and other material accumulations that include rags,paper,plastic and hair, and solids deposition result in failure of the sludge collection mechanism in the primary and secondary clarifiers. The construction phase of the clarifier projects is not scheduled to start until the North District WWTP headwork project is completed because this project will target rag and solids removal upstream of the primary and secondary clarifiers. Also,the construction phase for these projects cannot commence until completion of the Central District WWTP's headwork project because that project will require a substantial diversion of flows to both the South District WWTP and the North District WWTP. Hence,the North District WWTP's full capacity must be made available during that time. Both primary and secondary clarifiers at North District WWTP have a unique feature among the county's treatment plants in that the tanks are enclosed structures for odor control purposes. The voluminous metal enclosures create hot, humid and corrosive environments that attack exposed electrical, mechanical and air handling equipment along with metal and concrete structures. The resulting impacts are most prevalent in the primary clarifiers as the hydrogen sulfide concentrations are highest prior to oxidation in the oxygenation trains. For this reason the primary clarifiers will be rehabilitated prior to the secondary clarifiers. Primary and secondary clarifiers will not be rehabilitated in tandem as the reduced capacity of primary clarifiers during construction will cause hydraulic conditions that could result in solids carry over into the secondary treatment process. Solids carry over would stress the surface loading rate of secondary clarifiers and the return sludge pumping operations. The additional hydraulic stress of having secondary clarifiers out of service at the same time will adversely impact activated sludge 7 Page 804 of 1707 Case 1:12-cv-24400-FAM Document 25-6 Entered on FLSD Docket 06/06/2013 Page 8 of 8 settling, and could result in high TSS/CBOD concentrations in the plant's effluent during said rehabilitation. 8 Page 805 of 1707 • Case 1:12-cv-24400-FAM Document 25-7 Entered on FLSD Docket 06/06/2013 Page 1 of 8 Exhibit D-1 Capital Project Descriptions Project Number Project Name Project Description Project Impact/Need South District WWTP,8950 SW 232 St.,Goulds,FL 33170 1-allure at bar screen mechanism could result in the blinding or the oar screen and cause an overflow of raw sewage from the plant headworks 1.1 Headworks Routine repairs on existing bar screen mechanisms in headwork structure structure towards nearby surface waters,especially during peak wet prior to aerated grit chambers weather. Replacements and modifications are needed to meet WWTPs 125 ton 1.2 Oxygen Production oxygen demand.Loss ofure oxygen xygen production will affect performance of Replacement and retrofit of existing air compression units. secondary treatment process and result in effluent limit violations. Aeration mixers retrofit,structural rehabilitation,and surface coating 1.3 Oxygenation Trains application Loss of aeration tank capacity will result in effluent limit violations. Replacement of motor control centers,relocation of electrical panels and 1.4 Chlorine Building roof repairs of old chlorine building where flushing water pumps are to Roof leaks or failure of MCC and electrical panel could result in loss of plant remain. flushing water which in used for spray systems and odor control. Upgrade of existing obsolete pump control systems,upgrade pumps drives 1.5 Effluent Pump Station and motors and structural rehabilitation of pump station wet well Loss of pumping capacity or wet well function will result in unpermitted chambers 2-4. effluent discharge into the surrounding surface waters. Replacement of thickened sludge pumps,and electrical systems in 1.6 Gravity Sludge Thickeners concentrator pump station. Rehabilitation of concentrator collector Failure of sludge thickening will result in a biological overloading of the mechanisms and structural rehabilitation and coating of concentrators. secondary treatment process and effluent limit violations. Loss of digestion capacity will result in a decfne in blogas met ane 1.7 Digesters and Control Buildings Rehabilitation or replacement of digester roofs;digester tank cleaning, production for power generation and unstabllized sludge that will require structural rehabilitation and coating;sludge mixers Improvement landfill disposal. Replace existing interim dewatering building with a new permanent 1.8 Dewatering Facility dewatering facility,to include centrifuges,controls,polymer system, Failure of sludge dewatering would result in solids accumulation in the structural,mechanical and electrical systems. secondary treatment process and effluent limit violations. • Separation operations improvements to recently constructed FOG removal Current FOG separation tank Is not capable of adequately handing solids 1.9 FOG Removal Facility facility to aid in conveyance of oils and floating grease to beneficial use load,resulting in excess odors and unanticipated manual labor to remove option and removal of excess grit and settled solids. • large amounts of grit,settled soils and hardened grease. Complaints of nuisance odors by nearby residents could result from a lack 1.10 Odor Control Upgrade odor control facilities of properly functioning odor control systems. Loss of electrical controls or wiring could result in plant shutdowns, 1.11 General Electrical Rehabilitation and replacement of electrical controls and wiring as needed. wastewater overflows and effluent violations. Structural failure of a chlorine contact chamber would lead to a lack of 1.12 Chlorine Contact Chamber Structural disinfection contact time,an effluent violation.A hydraulic overload could also occur from multiple chambers being out of service for corrective Structural rehabilitation and coating of chlorine contact chambers 1-4 maintenance,resulting In an effluent spill to nearby surface waters. Page 806 of 1707 Case 1:12-cv-24400-FAM Document 25-7 Entered on FLSD Docket 06/06/2013 Page 2 of 8 Exhibit D-1 Capital Project Descriptions Project Number Project Name Project Description Project Impact/Need Central District WWTP,3989 Rlckenbacker Causeway,Miami,FL 33149 Loss of electrical controls or wiring could result in plant shutdowns, 2.1 Electrical Improvements Rehabilitation and replacement of electrical controls and wiring as needed wastewater overflows and effluent violations. Repairs to maintenance,operations control and administration buildings to These improvements are needed to provide staff with adequate and safe 2.2 Building improvements Include refurbishing of roofs and staff facilities facilities to perform their jobs. Failure of headwork electrical system will result in grit accumulation In secondary treatment process leading to effluent limit violations. Lack of 2.3 Headworks Plant 1 headworks screening results in accumulation of rags and plastics in plant Headworks retrofit to include addition of influent screens and an electrical processes,leading to pump,mixer and clarifier collection mechanism room with replacement of electrical systems failure;and effluent limit violations. Failure of headwork electrical system will result in grit accumulation in secondary treatment process leading to effluent limit violations. Lack of 2.4 Headworks Plant 2 headworks screening results in accumulation of rags and plastics in plant Headworks retrofit to Include addition of influent screens and an electrical processes,leading to pump,mixer and clarifier collection mechanism room with replacement of electrical systems failure;and effluent limit violations. Aeration mixers retrofit,structural rehabilitation,and surface coating 2.5 Oxygenation Trains Plant 1 application Loss of oxygenation tank capacity will result in effluent limit violations. Aeration mixers retrofit,structural rehabilitation,and surface coating --- 2.6 Oxygenation Trains Plant 2 --' application ^^_ Loss of oxygenation tank capacity will result in effluent limit violations. 2.7 Secondary Clarifiers Plant 1 Structural rehabilitation and replacement of sludge collection mechanisms Loss of sludge settling capacity will result in effluent limit violations. 2.8 Secondary Clarifiers Plant 2 Structural rehabilitation and replacement of sludge collection mechanisms Loss of sludge settling capacity will result in effluent limit violations. replacement of return sludge pump,piping,motor control centers and Loss of return sludge pumping capacity will result in a failure of the 2.9 RS Pump Stations Plant 1 structural repairs to pump stations aeration process and effluent limit violations. 2.10 RS Pump Stations Plant 2 replacement of return sludge pump,piping,motor control centers and Loss of return sludge pumping capacity will result in a failure of the structural repairs to pump stations aeration process and effluent limit violations. Loss of sufficient pumping capacity will result in unpermitted effluent 2.11 Effluent Pump Station Pump replacement in effluent pump station discharge into the surrounding surface waters. Replacement of thickened sludge pumps,sanitary sewer pumps,HVAC and electrical systems in concentrator pump station. Rehabilitation of 2.12 Sludge Thickeners Plant 1 concentrator collector mechanisms and structural rehabilitation and Failure of sludge thickening will result in a biological overloading of the coating of concentrators. secondary treatment process and effluent limit violations. Replacement of thickened sludge pumps,sanitary sewer pumps,HVAC and electrical systems in concentrator pump station. Rehabilitation of 2.13 Sludge Thickeners Plant 2 concentrator collector mechanisms and structural rehabilitation and Failure of sludge thickening will result in a biological overloading of the coating of concentrators. secondary treatment process and effluent limit violations. Loss of digestion capacity will result in a decline In blogas/methane 2.14 Digesters Plant 1 Complete rehab of sludge digester clusters(roofs,concrete structures, production for power generation and unstabilized sludge that will require recirculation&transfer pumps,mixers,&electrical systems) landfill disposal. Loss of digestion capacity willresuit in a decline in blogas/methane 2.15 Digesters Plant 2 Complete rehab of sludge digester clusters(roofs,concrete structures, production for power generation and unstabilized sludge that will require recirculation&transfer pumps,mixers,&electrical systems) landfill disposal. 'Construction of a new dewatering facility and sludge cake conveyance Failure of sludge dewatering would result in solids accumulation in the 2.16 Dewatering Building system to sludge storage buildings secondary treatment process and effluent limit violations. Page 807 of 1707 Case 1:12-cv-24400-FAM Document 25-7 Entered on FLSD Docket 06/06/2013 Page 3 of 8 Exhibit D-1 Capital Project Descriptions Project Number Project Name Project Description Project Impact/Need Central District WWTP,3989 Rickenbacker Causeway,Miami,FL 33149(continued) Failure of existing chlorine gas storage system could lead to and 2.17 Chlorination Facilities Replacement of chlorine gas storage,liquid chlorination and dosing system unregulated discharge of chlorine gas and exposure of plant personnel and with bulk sodium hypochlorite storage and dosing system in separate nearby community to chlorine gas.Additionally,a failure of the chlorine outdoor structures system would result In a lack of disinfection of effluent,a effluent violation. Odor control buildings motor control center replacement Including air 2.18 Odor Control Systems conditioned electrical rooms. Replacement of odor control chemical Complaints of nuisance odors by nearby residents could result from a lack pumps,piping,valves and gas stripping tower media. of properly functioning odor control systems. Installation of two new Cogeneration engines,Cogeneration Building Sudden loss of cogeneration engines could result in partial loss of power to • 2.19 Co-Gen Facility Improvements,replacement of biogas pipeline and installation o biogas the plant and temporary equipment shutdown.Consistent lack of conditioning system. cogeneration units would result in loss of heat for the anaerobic digesters. Construction of a new septage handling station to remove FOG from the 2.20 Septage Unloading main wastewater treatment stream and treat either through digestion or Septage currently puts and added load on plant's secondary treatment,is off-site third part facility. labor Intensive. odor complaints count result from an improperly functioning odor control system.Failure of bar screen mechanism could result In the blinding of the 2.21 Pump Station 1 bar screen and cause an overflow of raw sewage from the pump station Rehabilitation of pump station odor control system and of bar screen towards nearby surface waters,especially during peak wet weather flow mechanisms events. 11001 0ilipldIIns(.0010 result num an IIIIpiupelly UMIAK)n111g 0001 conn Ul system.Failure of bar screen mechanism could result in the blinding of the bar screen and cause an overflow of raw sewage from the pump station 2.22 Pump Station 2 towards nearby surface waters,especially during peak wet weather flow Rehabilitation of pump station odor control system,rehabilitation of bar events.Inability to access the station's flow meter in a timely fashion has screen mechanisms,and replacement pump stations flow metering to resulted In periods without proper flow measurement from this pump • improve maintenance accessibility station. 2.23 02 Plant Process Controls Phase 2 Replacement of process control equipment for existing oxygen production Loss of pure oxygen production will affect performance of secondary systems either due to equipment failing or being obsolete. treatment process and result in effluent limit violations. Personnel could be overcome by noxious fumes such as hydrogen sulfide, 2.24 Gas Monitoring carbon dioxide carbon monoxide or methane if unaware of their presence Gas monitoring and alarms in hazardous areas due to lack of gas monitoring. 2.25 Ventilation Improvements Ventilation Improvements in Hazardous Areas Sufficient ventilation in hazardous areas is required to meet NFPA 820. Replacement of corroded walkways,stairways,railings,grating throughout Personnel could suffer falling injuries from eroding concrete and corroding 2.26 Rehabilitation of Walkways and Stairways the plant metal. Construction of a new 80 ton/day oxygen production cryogenic tower and 2.27 Oxygen Production air compression unit to provide full redundancy as existing units are near Loss of pure oxygen production will affect performance of secondary the end of useful life and prone to failure. treatment process and result in effluent limit violations. SCADA RTU upgrades due to exisiting RTUs being obsolete and difficulty of Failure to upgrades these RTUs could result in loss of monitoring and 2.28 SCADA RTU Upgrades locating replacement parts control of unit processes Investigation as to the sources or increased i SS and BUu loading Influent loading characteritics wen above design parameters are 2.29 High Strength Influent Impact Study experienced at the plant and conceptual solutions to eliminate or mitigate contributing factors In effluent limit violations. If unadressed,continued the change in plant influent characteristics effluent violation are likely. Page 808 of 1707 Case 1:12-cv-24400-FAM Document 25-7 Entered on FLSD Docket 06/06/2013 Page 4 of 8 • Exhibit D-1 Capital Project Descriptions Project Number Project Name Project Description Project Impact/Need North District WWTP,2575 NE 156 St.,North Miami,FL 33160 Phase 1:Replacement of bar screens with perforated plate screens Phase 3.1 Headworks and Sludge Degritting Transfer 2:Upgrade pretreatment buildings for fire code compliance and Replacement of influent screens and upgrade of headworks will reduce replacement of primary sludge grit separation rags problems and Improve treatment process. Loss of primary clarifier capadty will increase workload of the secondary 3.2 Primary Clarifiers and Odor Control treatment process and will result in effluent limit violations.Complaints of nuisance odors by nearby residents could result from a lack of properly Rehabilitation of structural,mechanical and odor control systems functioning odor control systems. Rehabilitation of Aeration Tanks structural,mechanical and electrical 3.3 Oxygenation Trains systems Loss of oxygenation tank capacity will result in effluent limit violations. 3.4 Oxygen Production Loss of pure oxygen production will affect performance of secondary Rehabilitation of oxygen plant structural,mechanical and electrical systems treatment process and result in effluent limit violations. Structural,mechanical and electrical rehabilitation of the secondary 3.5 Secondary Clarifiers clarifiers Loss of sludge settling capacity will result in effluent limit violations. Failure of existing chlorine gas storage system could lead to and 3.6 Disinfection Replacement of chlorine gas storage,liquid chlorination and dosing system unregulated discharge of chlorine gas and exposure of plant personnel and with bulk sodium hypochlorite storage and dosing system in the existing nearby community to chlorine gas.Additionally,a failure of the chlorine chlorine building system would result in a lack of disinfection of effluent,a effluent violation. 3.7 Effluent Disposal Installation of standby pumps to ensure effluent disposal capacity and Loss of sufficient pumping capacity or wet well function will result in structural rehabilitation of ocean outfall pump station wet well unpermitted effluent discharge Into the surrounding protected wetlands. Loss of electrical controls or wiring could result in plant shutdowns, 3.8 Plant Wide Electrical Rehabilitation and replacement of electrical controls and wiring as needed wastewater overflows and effluent violations. Flooding of emergency standby generator and electrical switchgear area would result in loss of emergency power and power distribution. 3.9 Flood Mitigation Emergency g ry power is most critical during storm events when flooding is Generator and Electrical Building flood mitigation at NOW WTP most likely. Replacement of wastewater piping that interconnects unit processes A leak or rupture of plant yard piping will result in sewage and/or sludge 3.10 Yard Piping Replacement throughout the plant 1spill that may contaminate nearby surface waters. SOMA RTU upgrades due to exisiting RTUs being obsolete and difficulty of 'Failure to upgrades these RTUs could result In loss of monitoring and 3.11 SCADA RTU Upgrades locating replacement parts control of unit processes • Page 809 of 1707 Case 1:12-cv-24400-FAM Document 25-7 Entered on FLSD Docket 06/06/2013 Page 5 of 8 Exhibit D-1 Capital Project Descriptions Project Number Project Name Project Description Project Impact/Need Wastewater Collection and Transmission Lines Rehab of Collection System(Dig&Replace Mainlines and Laterals,Manhole Renewalfreplacement of defective gravity sewers with documented 4.1 Collection System I/I Repairs Replacement,Cured-In-Place Liners and Sectional Liners) excessive inflow/Infiltration 4.2 Government Cut FM-Phase 1&2 Replace existing portion of 54 Inch FM from the water shaft of Phase 1 in Replace critically damaged sections of 54-Inch force main to avert (construction ongoing) Government Cut to mainland Miami Beach catastrophic failures in Government Cut 4.3 Government Cut FM-Phase 3 Replace existing portion of 54 Inch FM from land shaft of Phase 1 at Fisher Replace critically damaged sections of 54-inch force main to avert Island to CDW WTP at Virginia Key catastrophic failures in Fisher's Cut Rehabilitation of the remaining 3.5 miles of the 72 inch PCCP FM located Replace remaining damaged section of 72-Inch force main that has 4.4 North Dade 72 inch PCCP FM Rehabilitation between NW 17 Ave and NE 10 Ave experienced catastrophic failure Rehabilitation orapproxlmately 2.5 miles of 54 Inch PCCP FM from SW 112 Replace sections of 54-inch force main that has critically damages pipe 4.5 South Dade 54 inch PCCP FM Rehahilitatlon Ave and SW 280 St to SW 107 Ave and SW 248 St segments 4.6 Replacement of Tamiami Canal Aerial Crossing Replace corroded twin 24 inch FM's crossing the Tamiaml Canal at NW 37 Replace twin 24-Inch force mains that are corroded and have experienced FM's at NW 37th Ave Ave,just south of NW 21 St failures Replace 1 mile of corroded 18 Inch DIP FM located at NW 60 Ave and NW 4.7 Replacement of 18 inch DIP FM In Miami Lakes 138 St Replace severely corroded 1B-inch pipe that has had multiple failures 4 6 Rehabilitation of 54 inch PCCP FM in the City of Rehabilitate by Cured-In-Place liner approximately 2 miles of 54 Inch PCCP Complete rehabilitation of 54-Inch force main that is deteriorated and has Miami FM located on NW 2 St between NW 67 Ave and NW 37 Ave experienced failures 4.9 Replace Approximately 25 miles of AC force Replace asbestos cement force mains that have experienced failures and mains See attached description of individual force mains are difficult to locate in the field. Complete rehabilitation of 4a-inch force main that is deteriorated and 4.10 Opa-Locka Airport 48'PCCP force mom Rehabilitation of 2.5 miles of 48"PCCP force main running along the determined to have approximately one quarter of its line segments replacement Biscayne Canal between NW 57th Avenue&NW 32 nd Avenue destressed based on In-situ condition assements • •Page 810 of 1707 Case 1:12-cv-24400-FAM Document 25-7 Entered on FLSD Docket 06/06/2013 Page 6 of 8 Exhibit D-1 Capital Project Descriptions Project Number Project Name Project Description Project Impact/Need Sewer Pump Station Systems The station has reach the end of its useful life. Booster station Is needed to 5.1 Upgrade of P5110418 Covert P58418 into a booster type station relieve pressures in the Doral area. Existing equipment is beyond its useful life.Station capacity increase is 5.2 Upgrade of P5110691 Replacement of pumping and electrical equipment required to handle Increased Homestead flows Existing equipment is beyond its useful life.Station capacity increase is 5.3 Upgrade of PS80692 Replacement of pumping and electrical equipment required to handle Increased Homestead flows 5.4 Replacement of Switchgear PS#0414 Replacement of electrical switchgear Existing equipment is beyond its useful life. 5.5 Replacement of Switchgear and Rehabilitation Replacement of electrical switchgear and rehabilitation of the wet well to Existing equipment is beyond its useful life.Wet well structure is of Wet well P580415 include a odor control unit deteriorated badly due to H2S 5.6 Replacement of Switchgear PS80416 Replacement of electrical switchgear Existing equipment is beyond its useful life. _ 5.7 Replacement of Switchgear and Rehabilitation Replacement of electrical switchgear and rehabilitation of the wet well to Existing equipment is beyond its useful life.Wet well structure is of Wet well PS80417 indude a odor control unit deteriorated badly due to H2S 5.8 Replacement of Electrical and Mechanical Existing equipment is beyond its useful life.Parts are not readily available Equipment in P5110107 Replacement of pumping and electrical equipment for the load cell type controllers 5.9 Replacement of Plumbing and Electrical Existing equipment Is beyond its useful life due to the saltwater Equipment at PS110301 Replacement of pumping and electrical equipment to include generator environment 5.10 Upgrade of P5110488 Conversion of pump station to submersible type station Existing equipment is beyond its useful life. 5.11 Installation of 60 inch FM from Kendall Dr to Installation of 60"F/M from Kendall Dr to PS80537 to eliminate the 42" To reduce pressure differential and Increase flow transfer between PS80536 reduction In the 60"F/M P560559 and 0536 5.12 Replacement of Switchgear at P5110187 Replacement of Anvic Drive with VFD Existing equipment is beyond its useful life.Parts are not available 5,13 Refurbish Emergency Generators and Controls Refurbish emergency generators and controls at regional pump stations Emergency backup generators are unreliable due to age of controllers and at Regional Pump Stations due to parts obsolescence condition of wiring on the engines 5.14 Upgrade of PS 80086,0492 See attached Pump Station Compliance Projects sheet for Individual pump The pump stations are out of compliance of the Adequate Transmission station project descriptions. Capacity Criteria with a NAPOT of greater than 10 hours. 5.15 Upgrade of PS 80065,0201,0334,0374,0607 See attached Pump Station Compliance Projects sheet for Individual pump The pump stations are out of compliance of the Adequate Transmission station project descriptions. Capacity Criteria with a NAPOT of greater than 10 hours. 5.16 Upgrade of PS#00198,0437,0466,0680 See attached Pump Station Compliance Projects sheet for individual pump The pump stations are out of compliance of the Adequate Transmission station project descriptions. Capacity Criteria with a NAPOT of greater than 10 hours. 5.17 Upgrade of PS#0037,0351,0370,0403 See attached Pump Station Compliance Projects sheet for Individual pump The pump stations are out of compliance of the Adequate Transmission station project descriptions. Capacity Criteria with a NAPOT of greater than 10 hours. 5.18 Upgrade of PS 80441,0491,0710,0827,0852, See attached Pump Station Compliance Projects sheet for individual pump The pump stations are out of compliance of the Adequate Transmission 1236 station project descriptions. Capacity Criteria with a NAPOT of greater than 10 hours. SCADA RTU upgrades for 635 pump stations due to exlsiting H i Us being Failure to upgrades these RTUs could result in loss of monitoring and 5.19 SCADA RTU Upgrades obsolete and difficulty of locating replacement parts control of wastewater pump stations Page 811 of 1707 Case 1:12-cv-24400-FAM Document 25-7 Entered on FLSD Docket 06/06/2013 Page 7 of 8 Individual AC force mains In Pro ect 4.9 I'I?r !'f';lli C•Gq.•,•wp t Lo'I..a,IU•,n h• ,,,;lU•,n ":1.c ic!,1.1 Ivil, f.!iLllf J;ii Ac:1.111 S'c,:'' ronitlwrY4 1 2757 12 SW 112 Ave&SW 104 St SW 112 Ave&SW 112 St 521 NA NA NA 2 2000 8 NE 14 Ave&191 St NE 14 Ave&Miami Gardens Dr D2 ES 4708 1,2 3 1520 6 PS 356 NW 53 Ct&NW 195 Dr L2 ES 836 4 4 1430 8 NW 53 Ct&NW 195 Dr NW 52 Ct&NW 191 St L2 ES 835 4 5 920 10 NW 52 Ct&NW 191 St NW 52 Ct&NW 188 St L2 ES 836 4 6 276 6 PS 362 NW 52 Ct&NW 190 St L2 ES 793 8 7 400 10 NW 52 Ct&NW 190 St NW 52 Ave&NW 189 Ter 1.2 ES 793 8 8 1650 10 NW 52 Ct&NW 188 St NW 52 Ave&NW 183 St L2 ES 836 5 9 1492 8 PS 385 NW 29 Ct&NW 199 St 11 ES 826 4 10 1080 12 NW 29 Ct&NW 199 St NW 30 PI&NW 199 St 11 ES 826 4 11 400 8 NW 29 Ct&NW 199 St NW 28 Ave&NW 199 St 11 ES 830 3 1 12 310 6 PS 374 NW 28 Ave&NW 199 St 11 ES 830 3 13 3235 12 NW 30 PI&NW 199 St NW 37 Ave&NW 199 St 11 ES 823 4 14 1785 8 PS 368 NW 37 Ave&NW 194 Ter 12 ES 834 2 15 896 4 P5 375 NW 29 PI&NW 191 St 12 ES 818 6 16 896 10 PS 427 NW 29 PI&NW 191 St 12 ES 922 1 17 1076 10 NW 29 PI&NW 191 St NW 32 Ave&NW 191 St 12 ES 818 6 • 18 2614 6 PS 376 NW 32 Ave&NW 191 St 12 ES 782 7 19 1450 6 P5 377 NW 36 Ave&NW 183 St 12 ES 797 1 20 467 8 PS 366 NW 42 P1&NW 199 Ter K2 ES 808 5 21 1792 10 NW 42 PI&NW 199 Ter NW 39 Ct&NW 199 St K2 ES 808 5 22 2056 6 PS 358 PS 352 K3 ES 775 12 23 11027 8 PS 1022 PS 1072 AA36,Z36 ES 4597 1 _ 24 1793 8 PS 353 NW 48 Ct&NW 178 Ter 13 ES 780 15 25 1425 10 NW 52 Ave&NW 173 Dr NW 52 Ave& NW 178 Terr 13 ES 788 12 _ 26 2025 6 PS 354 NW 52 Ave&NW 173 Dr 1.3 ES 788 12 27 2450 4 Pvt PS @ SW 149 Ter MH 14 @ PS 719 Q23 Q24 ES 676 1 28 1610 8PS786 _MH5@PS785 R15 U 93 1 29 1350 12 PS 811 SW 107 Ave&SW 76 St R19 U 136 1 30 2745 12 P5 811 SW 102 Ave&SW 81 St. R19 U 123 3 31 2168 10 PS 812 SW 5W 102 Ave&SW 84 St R19 U 411 1 32 1622 12 SW 107 Ave&SW 104 St SW 107 Ave&Kendale Blvd R20 U 245 2 33 1266 4 Pvt PS @ SW 1104 Ave&SW 169 St MH 59 @ SW 103 Ave R25 ES 741 1 34 6612 10 PS 709 Homestead Ave&Kumquat St R25 ES 739 1 35 2505 6 SW 110 Ave&Banyan St SW 95 Ave&SW Banyan St R25 N/A N/A N/A 36 649 4 PS 721 US1&Banyan St R25 ES 701 1 37 767 4 PS 749 PS 731 R25 ES 650 2 38 1066 4 PS 747 USI&East Indigo St R25 N/A N/A N/A 39 __ _1418__ __10_SW 102_Ave.&SW 176 St _Hom_este_ad Ave&_West Jessamine R25 ES 687 8 40 4017 _ 8PS745 -- _-��+ _--- SW 102 Ave&SW176St —_�_ R25 — +ES �— 687 --- —g.__, ___ 41 1386 4 PS 731 SW Duval Ave&West Indigo St R25 ES 741 1 42 3769 10 SW 102 Ave&West Jessamine US 1&SW 184 St R25 ES 739 2 43 1858 12 Homestead Ave&SW 180 St Railroad St&SW 184 St R25 ES 739 2 44 1200 8 PS 810 SW 118 PI&SW 72 St 519 U 243 1 45 • 650 12 PS 793 SW 118 P1&SW 72 St S19 U 243 1 46 666 6 PS 724 SW 106 Ave&SW 155 St S24 ES 734 1 47 973 8 PS 869 SW 122 Ave&SW 88 St T20 U 149 5 48 1822 10 PS 1017 SW 123 PI&SW SW 268 St T31 ES 1039 3 49 3412 10 PS 1029 SW 132 Ave&SW 268 St 1130 ES 1044 1 50 5649 8 SW 137 Ave&SW 268 St SW 128 Ave&SW 268 St 1131 ES 1040 6 51 6432 10 PS 1028 SW 137 Ave&SW 288 St U31 ES 1040 6 52 5461 10 PS 1027 SW 132 Ave&SW 280 St U31 ES 1049 4 53 2340 8 PS 1018 MH 44A @ SW 132 Ave 1132 ES 1053 1 54 2680 12 SW 137 Ave&SW 72 St SW 142 Ave&SW 72 St V18 U 191 1 55 2363 12 SW 142 Ave&SW 72 St SW 147 Ave&SW 72 St V18 U 202 6 56 2451 8 PS 864 SW 147 Ave&SW 72 St V18 U 202 4 57 1441 8 SW 142 Ave&Kendale Lakes Blvd SW 140 Ave&Kendale Lakes Blvd V19 U 420 5 58 2101 10 SW 140 Ave&Kendale Lakes Blvd SW 137 Ave&Kendale Lakes Blvd V19 U 420 4 59 776 12 SW 137 Ave&Kendale Lakes Blvd SW 137 Ave&SW 81 St V19 U 420 4 60 1420 8 PS 1013 PS 1012 V31 ES 4543 3 61 2213 10 PS 1012 SW 144 Ave&SW 280 St V31 ES 4543 3 62 9S8 8 PS 1011 SW 144 Ct&SW 280 St V31 ES 4544 3 63 6565 10 SW 147 Ave&SW 288 St SW 134 PI&SW 288 St V32 ES 1056 1 64 1236 6 PS 1009 SW 147 Ave&SW I96 St V32 ES 4547 1 65 1819 6 PS 1006 PS 1005 W32 ES 4594 1 66 2989 8 PS 1002 SW 152 Ave&SW 304 St W33 ES 4593 3 136839 Feet 25.916477 Miles Page 812 of 1707 Case 1:12-cv-24400-FAM Document 25-7 Entered on FLSD Docket 06/06/2013 Page 8 of 8 Description of Individual Pump Station Compliance Protects }Jy.;^,t'yps_ �v.., :'>', Sit.. �=.•,l af,Yl VIS...••,. �rt tt '.1:Z.t.. � c��v r,�- •. -'a 'i'. ....c`�""'.;=x._j,zr•�q't E�... J i ,j ASI *1 �/� ��7q ;� $ ,, � rs� '`' Yw5 f.Rs i. t s:• > kS`}�` •;tYnd 4P:.t>��}� a „5,,.� i,'�c % �` }t� +��., V rIF.�.+.�i� 4 i i ,t`.,• h° :.' .,y' ,.r dint M:11 _ ��S alikii*i'SS +3;c�. =1>r', T�fx:��,....,: ;#,._ PUMP STATION 0065 New submersible pumps in the existing dry well/Larger suction and discharge piping/Electrical upgrade PUMP STATION 0086 Convert to submersible with existing wet well/Electrical upgrade PUMP STATION 0201 New submersible pumps in the existing wet well/New valve box/Electrical upgrade Complete 1/148 repairs for 176 gpm PUMP STATION 0334 New submersible PS/Electrical upgrade 2,200 L.F. of new 8" FM PUMP STATION 0374 New submersible pumps and valve box/Electrical upgrade 320 L.F. of new 8"FM PUMP STATION 0492 New submersible PS/Electrical upgrade PUMP STATION 0607 New submersible PS/Electrical upgrade • PUMP STATION 0198 New submersible pumps in the existing dry well/Electrical upgrade Flow isolation and I/I repairs as needed PUMP STATION 0437 New submersible pumps and valve box/Electrical upgrade PUMP STATION 0466 New submersible pumps and valve box/Electrical upgrade PUMP STATION 0680 New submersible pumps/New valves above ground/Electrical upgrade PUMP STATION 0037 New submersible PS/Electrical upgrade PUMP STATION 0351 New submersible pumps and valve box/Electrical upgrade Replace 360 L.F. of 4"with 8" FM PUMP STATION 0370 New submersible PS/Electrical upgrade 760 L.F. of new 8" FM PUMP STATION 0403 New submersible PS/Electrical upgrade/On site generator PUMP STATION 0441 New submersible PS/Electrical upgrade PUMP STATION 0491 Flow isolation and I/1 repairs as needed PUMP STATION 0710 New submersible PS/Electrical upgrade 1,800 of L.F. of new 8" FM PUMP STATION 0827 Larger submersible pumps/New valve vault/Electrical upgrade Replace 1,600 L.F. of 4"FM with 8" FM PUMP STATION 0852 New submersible PS/Electrical upgrade PUMP STATION 1236 Complete I/I 300 repairs for 130 gpm Page 1 Page 813 of 1707 Case 1:12-cv-24400-FAM Document 25-8 Entered on FLSD Docket 06/06/2013 Page 1 of 7 E#Ilbd 0.2 Capital Werk Plan with Milestones revised March 8,2013 _ ID I ID resit Name 1 Danalbn Stan I Finish 112010_.....,26?3_.( _2014_..;..'12015 - ....13.9...1.._....2017..._.....1$01¢___._...2019.. .139g9.....-'_-..ISQ21 42022 ..,....120X5..___.-..;2904....... LOOTS . 4202d _1.1027..,,_,....:V_? _,r,Num¢er _„ ,,,,_._._........ ....._-.... ......)..._.... ....I ....._..__7 Ow 901Jan 6prl4410clJeriAM 14 .Jen J Oshie A�l4 I OnIJam[_1p1JUI JenAPd4111OsIJors of Jan/SONS! JiJyl,�c0JanAkriiud OchlamAp h_leiCoIJanAMJ-0112niJaP4P044.l On,JanAprslu10c14a,F1a 4nl 9QWrpnJul On 1 1 South Obtrk11188 4399 days Fd 1111/13 Suntl/1W251 • • 2 � 1.1 14eadwaks 1607 days Thu 10/1/15 Sun 22320 • ♦ 3 1.1.1 Engineering Design 209 days Thu 1011/15 The 426/16 giongs,Enghsserirsg Design 1.1 4 1 1.1.2 Perminig 365 days Wed 427/18 Wed 426/17ing .Pernrdtlhg 1.1 5 1.13 Procurement 365 days Thu 427/17 Thu 426/18 ,Procurement 1.1 • 6 1.1.4 Construction 668 days Fri 4/27/18 Sun 22320 A Construction 1.1 7 1.2 Oxygen Production 1717 days Thu 1/1/15 Fri 9/13/19 • ♦ . 8 1.2.1 Engineering Design 235 days Thu 111/15 Sun 823/15 -Engineering Design 1.2 ...s... 1.z.2 Permitting 365 days Mon 824/15 Mon 822/181 Pemdh#g 12 IO•1 1.2.3 Procurement 365 days Tue623/16 The 822/17 Procunmen11.2 11 ! 1.2.4 Construction 752 days Wed 823/17 Fri 9/13/19 Construction 1.2 .12.E 1.3 Oxygenation Tnins 3303 days Tue 11/1/18 Sun 11/1825 5 • 13-- 1.3.1 Engineering Design 259 days The 11/1/18 Mon 7117/171.0111.111Ergkresr 09 Design 1.3 Permitting 365 days Tue 7/18/17 The 7/17/18 noun/ging 1.3 15 1.3.3 Procurement 365 days Wed 7/18/18 Wed 7/17/19 Proeumnerd 1.3 • -18 1.3.4 Construction Train 5 123 days Thu 7/18/19 Sun 11/17/19 .f......./ tion 1.3 17 I 1.35 Construction Train 6 123 days Fri 7/17/20 Mon 11/1620 ion 1.3 18 . 1.3.6 Construction Train 4 124 days Fri 7/1621 Tun 11/16/21 19 1.3.7 Construction Train 3 124 days Sun 7/1722 Thu 11/17/22 Ion 1.3 20 1 1.3.8 Construction Train 2 124 days Mon 7/17/23 Fn 11/17/23 '- ton 1.3 Construction Tram 1 124 days Wed 7/1724 Sun 11/17/24 - • .Con tion l.3 22 1.3.10 Construction Train 7 123 days Thu 7/17/25 Sun 11/18/25 Construction 1.3 •23...� 1.1 Chlorin*Budding 1279 days Sal 1211/18 Wed 6/1/22 ♦ ♦ 21 1 1.4.1 Engineering Design 131 days Sat 12/1/18 Wed 4/10/19Faghnwhg Ossign 1.4 25 .1 1.4.2 Permitting 365 days Thu 4/11/19 Thu 49/20 Permitting 1.4 28 1 1.4.3 Procurement 365 days Fd 4/1020 Fri 4921 Pmcunrtwnt I.4 27.. ., 1.4.4 Conslnclon 416 days Sal 4/10/21 Wed 6/122 Construction 1.4 --2-1-1 1.5 EBluenl Pump Station 2045 days Thu 9/1/16 Thu 41722 • • 291.5.1 Ergi Bering Design 313 days Thu 9/1/16 Mon 7/10/11 . Enghrnnd g Deslpn 1.570-- 1.5.2 Permitting 365 days Tue 7/11/17 Tia 7/10/18 Permitting 1.5 31 11111 1.5.3 Pnocuremenl 365 days Wed 7111/18 Wed7/10/19 Pr000rwMnll.S 32 1 1.5.4 Construction 1002 days Thu 7/11/19 Thu 4/722 Construction IS 33 1 1.8 amity Sludge ThkkeMn 1728 days Mon inn 8 Set 9241221 34..1 1.6.1 Engineering Design 230 days Man 1/1/18 Sat 8/18/181EnpkrserOI9 Design 1.6 Penmhtmg 365 days Sun 8/19/18 Sun 8/18/19 Penn811ng 1.8 36 1.6.3 Procunmenl 385 days Mon 8/19/19 Man 8/1720 Procurement 1.8 ' 37 1.6.4 Construction 768 days Tire 8/18/20 Sat 9/24722 - - Construction 16 381.7 Dlgeslsre and Control Building 2919 days Fitt ill/13 Thu 102621 39 'I 1.7.1 Engineering Design 268 days Fd 11/1/13 Sat 7261141 mum En9lnewNg Design 1.7 • 40 1.7.2 Permntig 365 days Sun 7/27/14 Sun 726/15 ,Pennitting 1.7 --4-1---1 1.7.3 Procurement 385 days Mon 7/27/15 Mon 7/25/161 �}Procunnlant 1.7 -42-1 1.7.4 Construction 1921 days Tue 7/26/16 Thu 102821' _ Construction 1.7 43 1 1.8 Dewnp eteri Featly 1977 days Toe 7/1/14 Thu 1129/191 44. 1.8.1 Engmeerig Design 287 days The 7/1/14 Mon 4/13/15glnnrin9 Des/n 1.8 45 1.8.2 Permitting 365 days Tue 4/14/15 Tue 4112118 �Er ,Permitting^1S ■} 46 1.8.3 Procurement 365 deye Wad 4/13/18 Wed 4/12/17 i�..Prceurenwnf l.5 17 1.9.4 Construction 960 days Thu 4/13/17 Thu 1128/19 Construction/.9 , 49 • 1.9 FOO Removal Fealty 1498 days Fri 1111/13 Thu 12/7/171 • ♦ 49 1 1.9.1 Engineering Design 183 days Fri 11/1/13 Fri 52/14' m...,Enghwrkg Design 1.9 50 ! 1.9.2 Permitting 365 days Sat 50/14 Sal 5/2/15 imminum PwmSthg 1.9 SI 1.9.3 Procurement 365 days Sun 5/5/15 Sun 5/1/16 _ Procurement Construction 1.9.4Construction 585 days Mon 52/16 Thu 12/7/17 meConstmclIon 1.9 53 1.10 Odor Control 1607 days Sal 12/1/16 The 42523 _ -54-' 1.10.1 Engineering �Design 209 days Sat 1211/18 Thu 827/19 ErgMsedng Design 1.10 --35-- 1.10.2 Permitting 365 days Fri 828/19 Fri 62820 Pamd6hrg 1.10 56 i 1.10.3 Procurement 365 days Sat 827/20 Sal 6/28/211 Procurement 1.10 57 . 1.10.4 Cmteiuctbn 668 days Sun 62721 Turf 425/23 Com/Motion 1.10 58..1 1.11 Wend Electrksf 1607 days Tue 1111/76 Fr1372621 -59-1 1.11.1 Engneemg Design 209 days Tue 11/1/16 Sun 5/28/17 • . am.Engineering DSSIOn 1.11 . .._60.... 1.11.2 Permitting 365 days Mon 529/17 Mon 526/16 • -Permitting 1.11 di 1.11.3 Procurement 385 days Tue 5/29/18 Tue 528/19 ' • ,procurement 1.11 62 1.11.6 Construtlbn 666 days Wed 529/79 Fri 3/26/21 • Construction 1.11 • -6:i. ...63', 1.12 Chlorine Contact Chamber Struelwai Rehab 1763 days Mon 8/1/18 Fri 8/1621 5 4 1 . 84-.I 1.12.1 Engineering Design 251 days Mon 6/1/16 Se14/8/171 609101erin9 Design 1.12 65 1.12.2 Permitting 365 days Sun 49/17 Sun 49/181 dliummuippannidino 1.92 Project:Project Scheduling MSProject Task IIMINIMINIIIIII Progress Summary 191. • External Tasks t-------) Deadline Date:Wed 3/6/13 SPE ,,,,,,,,,,,.. Milestone • Project Summary 7-- "7 External Milestone 4/ Page 1 Page 814 of 1/DT Case 1:12-cv-24400-FAM Document 25-8 Entered on FLSD Docket 06/06/2013 Page 2 of 7 Exhibit D-2 Capital Work Plan with Milestones revised March 8.20 t3 ' ID ID ash Name Duration Stag Finish - 32012 2013_ _ 2014 --_2016 _.1.21 116 _ „2017-, _J/Q1L_--__tgt9 _ 2020 __-2821 42028___.__1.24/22 120g4_.� 12025. 20_26. 2027- NumberI�r Ir I -_.. - Jui _ an pr, u L-J;n DR__ . 1 r IDc .[JulOuWen� [Jul'OcpJ]At[Jul_.JenA r4y1I1 iJe rJ I " .nil i.'-_,_ -_.. , ..-_. I_.__.._._..__r____..._.__.._.._._.___...._.._.._..._..___.1.. _. L n 4 ..IO _ I.pc1 _. Ju IJa _nN�Jyl----.IJ_. rJDI OctJa _3 Nc_ P:1Jul OctJen�r�Jul.Octile:iAP..JulgclJan�Apr1Jylgct,l_a_rtAprjJul OctJenFip:JJul_ JafQlJul Octj ciJ A n JylOaJe pr 68 1.12.3: Procurement 385 days Mon 4IB/78 Man 4/&19 Proeuroment 7.12 67 1.72.4: ConstruMion - 802 days Tue4/8/19 Fn 6/1621 .• ICombustion 1.12 • ' 68 2.C.Mral District RBA 5383 days Tue 1%1/13 Mon 927/27 . F • • • ....89... 2.11 Mlacallaneous Electrical Improvement. 1181 days Sun 111/17 Fri 3/6/20 ♦ • -70- 2.1.1. Engineering Design 171 days Sun 1/1/17 Tue 6/20/17 • Engineering Design 21 • .71--- 2.1.2, Permitting 365 days Wed 821/17 Wed 6/20/18 PermiMing 2.1 Procurement 365 days. Thu 6/21/18 Thu 620/19 Procurement 2.1 73 2.1.4 Constructiod 280 days Fri 6/21/.19: Fri3/6/20 Construction 21 . • .-14-- 22 Repairs to Various Butldhgs 1225 days Thu 61/14, Wed 916/17 ♦ I _• • 75 2.2.1 Engineering Design 171 days Thu 5/1/14Sat 10/18/14 EerglnlesHng Oesipn 2.2 . • Permitting 365 days Sun 1619/14 Sun 10/1615 Pm011009 2.2 77 2.2.3 Procurement 365 days Mon 10/19/15 Mon 10/17/16 Prottlrmnenl 2.2 • 78 2.2.4 Construction 324 days Tue 10/18/16• Wed 915/17 �" Construction 2.2 - ' • 79 2.3 Hoadworlu/Orn Basin Plant 1 1483 days 1.110 10/1/13 Sun 1022/17 ♦ _ 4 80 2.3.7 Engineering Design 307 days Tue 10/1/13 Sun 8/3/14 En5lnesdn9 Dentgn 2.3 ' 81 2.32' PermiMh9 365 days Mon 6/4/14 Mon 8/3/15 Pern0Nng 2.3 82- 23.3 Procurement 365 days Tee 8/4/15 Tue s/216 . .Procurement 2.3 • Construction 446 days Wed 8/3/16 Sun 10/22/17 Constnect/on 2.3 • ; --94--- 2.4' Hendrix/Me/GM Basis Plant 2 1483 days Thu 5/1/14 Tue 522/18 ♦ • . 85_ 2.4.1 Engineering Design 307 days Thu 5/1114 Tue 3/3/15Englnesd09 Design 2.4 88 2.4.2 Permitting 365 days Wed 3/4/15 Wed 3/2)18 Permitting 24 • 87 2.4.3. Procurement 385 days Thu 36/16 Thu 3217 Procurement 24 ' --W. 2.4.4' Construction 448 days Fri 313/17 Toe 522/18 Construction 2.4 --882.5, Orygenstbn Trains PWtl1 1415 days Sun 61/14 Sun 915 /18 ♦ 4 90 2.5.1 Engineering Design 94 days Sun6/1/14 Tue 9/2/14 • nelneedog Design 2.5 " 81 2.5.2: Permitting 385 days Wed 9/3/14 Wed 9215 'Permitting 2.5 -..92 1 2.5.3 ' Procurement 365 days Thu 913/15 Thu 9/1/16unnwnt 2S • 93 J 2.5.4 Construction Train 02 196 days Sal 10/1/16' Fir 4/14/17 - ction 2.5 - 94 2.5.5 Construction Train a3 197 days Sun 7011/17 Sun 4/15/18 Construction 2S " 95 1 2.6 Oxygenation Trains Plant 2 2144 days Wed 6/1/16 Thu 4/1422 ♦ • • 98 2.8.1: Engineering Design 94 days Wed 6/1/18 Fd 9216 Engineering 009Ign 2.6 97 2.6.2 Permitting 385 days Sat 913/18 Sat 9217 •Perm/Bing 2.8 98 2.6.3' Procurement • 385 days Sun 913/17' Sun 9218 Prone/emu/1 2.6 ction Train*I. 197 days Mon 92/18. Mon 3/16/19 : • ction Train ir2 197 days Tue 10/1/19' Tue 4/14/20 • • • 102- 26 7 Construction Tction rain 186 ain*3 197 Ueya Fn iys Thu WIRI� Thu 4/14 crises 26 cWn 26 • Construction 2.fi 153 2.7 Secondary CladOMn.Plant 1 1963 days Thu 4/1/21, Sat 6/15/26 ♦ - - •' . .... ... .. ...... .. 'Engineering Design 2.7 ' 104 2.7.1Erghesdrg Design 188 days Thu 4/181 'Tee.18/5/21 9 105 2.7.2 Permitting 365 days Wed 10/621' Wed 1015/22 _ Permitting .• Procurement 365 days Thu 10/8/22. Thu 10/623ProcurementPlurement 2.7 107 2.7.4'. CorcVuciion Clarifiers 1.2 348 days Fd 10/8/23_ Tux/9/17124 .Constrectlml 2.7 - 108 ' 2.7.5 Construction Clarifiers 3.4' '848 days Wed 911824' Sun 8/31/25 • rtru Cenction 27 109 2.7.6 Construction Clarifiers 5.8 349 days Mon 91185 Sat 8/15/16 . Construction 2.7 710 •2:8 Seed0dery CUdtieta Plant 2 2680 days Wed 61/16 Tue 9/12/23 ♦ 111 2.8.1 Engineering Design 1813 days Wed 6/1/115 Mon 1215/16 Engineering Deel9n 2.8 ' 112 2.8.2 Penmltth9 365 days Tue 12/6/16: Tue 12/5/17 • Perrnitl1n92.9 113 2.8.3 Procurement 365 days Wed 12)6117. Wed 12/5/18 Procurement 2.8 • 114 2.8.4 Construction CIar8lers 1,2 348 days Thu 12/6/18' Mon 11/18/19 Construction 2.8 i • 115 2.8.5 Construction Cled6iars 3.4 349 days Tue 11/19/19 Sun 11/1/20 ' Conatructlon 2.8 • -118 2.6.6 Construction Clarifiers 5,8 348 days Mon 11216 Fd 10/15/21 Construction 2.8 7 2.8.7. Consvuction Clarifiers 7,8 . '' 11348 days Sal 10/16/2I Wed 92822 • Construction 2.8 • 118 2.8.8 Conitruttbn Clarifiers 9,10 349 days Thu 829/22 Tue 9/12/23 • ConatruCllon 2.8 • • 119 2.0 RCM.Sludge PS Rant 1 1963 days Thu 4/121 Se18/15/28 • ♦ 120 2.9.1. Engineering Design 188 days Thu 4/1/21 Tue 10/521 _Engineering Design 2.9 121 2.9.2 Permittkg 365 days Wed 10/621 Wed 10/522 •- Permitting 2.9 ' 122 2.9.3 Procurement 365 days Thu 10/822 Thu 10/5/23Procurement 2.9 723 2.9.4. • Construction PS al 348 days Erf 10/823 Tue 9/17/24 Construction 2.0 124- 2.9.5: Corshuctian PS 72 348 days Wed 9/1824 Sun 8/31/25 Construction 2.9 •125 2.9.6 ComtructIon PS e3 349 days Mon 9/125 Sat 8/1526 Construction • 128 2.10Return Sludge PS Pont 2 2660 days' Wed 61116 Tue 0/1T23 ♦ • - 127 2.10.1 Engineering Design 168 days Wed 6/1/113 Mon 12/5/16 gunDiErtglmserIng Design 210 _128 2.10.2 Permitting g 385 days Tue 12/8/18 Tue 12/5/17 Perm1 2.10 129 2.10.3 ProcurameM 385 days Wad 12/617. Wed 12/5/18 Proe 2.10 .._.__. . 1 ,._2.10.4- ,_ Construction P51/1__-._-._._. .,__ 348 days Thu 12/6/18 Mon 11/18/19 - Construetlon 2.10 ' Project Project Scheduling MSPraject Test 1011=Mig Progress raremr Summary • External Tasks Eiiiiii Deadens II Date:Wed 3/6/13 Sptr ,,,,,,,,,..,, Milestone • Project Summary u '97 External M0nnl00e C Page 2 Page 815of17u, Case 1:12-cv-24400-FAM Document 25-8 Entered on FLSD Docket 06/06/2013 Page 3 of 7 . Exhibit 0-2 Capital Work Plan v.lh Milestones revised March 8.2013 ID ID !Task Name 1 Duration Stan Finish 1.....12912.., ....12013 2214.._........INIS.r.. .....124.+6..r.........12012.._.......12019..,...r 2.Q.1&.,......._}202012(121._....;.._:2022.......;....L2023......_.-_.12029.............2025....___....12426_-.. 1._�_..r....30? ..........i6/e5/rue.l.__......._... i I _I.___.__...._.JUI Oc1Jen'AOrlJ,u,IboIJen;Apr1J.!3 Jan/1prIJulOclJrr_nApsIJP/Qst-J.a<.Mpr1 001.2 pr1Jul OclJenApr;Jul,.t.2 1rpr14pl ) _Jy.I8 I.2IanektreiIWOclJan�/Ip.,Iv.iQoWeNMPg•Let.Cci./5n9/nlvl,Q0IJ9/p!:4410ol49]pr..4l 5(llan/294.61«71 131 l 2.10.5 Construction PS 12 349 days Tire 11/19/19 Sun I1/120 Cduiruet 052.10 132 1 2.10.6 Gorstructbn PS 13 348 days Mon 11220 Fri 10/1521 Construction 2.10 133 2.10.7 Construction PS e4 348 days Sat 10/16/21 Wed 928/22 • Construction 2.10 134 2.10.8 Construction PS 45 349 days Thu 92922 Tue 9/1223Const ruction 2.10 135 2.11 EXWsnI Pump Station 1225 days Sun I/1/17 Sat 5/9/20 res M-M 4 • 136 2.11.1 Engineering Design 171 days Sun 111/17 Tue 6/20/17 Enpinesrhre Design 2.11 --187 2.11.2 Permitting 385 days Wed 821/17. Wed 620/16 PermitXMg 2.11 , 138 2.11.3 Procurement 385 days Thu 6/21/18 Thu 62Wl9 •Pnoutaleent 211 139 2.11.4 Construction 324 days Fri621/19 Sat 5/920 Construction 2.11 140 2.12 Gnvlly Sludges Thickeners Plant l 1484 9870 Sa1411/I7 Fr112121 • 4 141 I 2.12.1 Engineering Design /88 days Sat4/1/17 Thu 10/5/17, ii..Eginssnsg Design 2.12 1142 1 2.122 Permitting 365 days Fri 10/8/17 Fri 10/5/181Pamdlll g 2.12 •'143 1 2.12.3 Procurement 385 days Sal 10/6/18 Sat10/5/19) Procurement 2.12 -- 144! 2.12.4 Construction 566 days Sun IOapiB Fri 42321. • Construction 2.12 145 M 2.13 Cr5Nty Sludge Thickeners Plant 2 1484 days Thu 10/1/15 Wed 1021191 ♦ 4 -146 1 2.13.1 Engineering Design 188 days Thu 10/1/15 Tue 4/5/181 am Engs lnebg Design 2.13 147 i 2.13.2 Perm8lig 385 days Wed4/6/16 Wed 4/5/171 P4eMX5g 2.13 148 1 2.13.3 Pro0ursmenl 365 days The 42/17 Thu 4/5/18 Proounnrnt 2.13 •ise 2.13.4 Construction 566 days Fri4/6/18 Wed 1023/19 Construction 2.13 150 2.14 Dlgastsn Plan l 2090 days Fri 5/1/20' Mon 1/1926 • 4 15/-' 2.14.1 • Cluster 1510 days Fri 511/20I Tue 5/1824 ♦ 4 15E• 2.14.1.1 Engineering Design 169 days Fri 51120 Wed 11/4/20 Engineering Design 2.14 153 l 2.14.1.2 Permitting 365 days Thu 115/20 Thu 11/4/21 PsmdttIng 2.14 • 1542.14.1.3 Procurement 365 days Fri 11/5/21 Fri 11/422 1Praunmstd 2.14 ii 12.14 .1.4 Construction 592 days Sat 115/22 Toe 6/1824 Canelnelion 2.14 158 1 2.14.2 Cluster 2 1511 days Wed 12/1/21 Mon 1/1926 '• 4 157 2.14.2.1 Engineering Design 188 days Wed 12/121 Mon 8/8/22 E ginesnn9 Design 214 19- 9��12.14.22 Permitting 365 days Tue 6/7/22 Tue 65/23 • 4Pmn0eg 214 159 12.14.2.3 Procmemem 385 days Wed 8723 Wed 6/5/241Pncunnrs^12.11 •..160 2.14.2.4 Coneouc8on 593 days Thu 62/24 Men 1/1926 Construction 2.14 161 2.15 Digesters Plant 3245 days Tue 10/1/13 Fri 6/19/22 • • 162'''I 2.15.1 Cluster l 1510 days The 10/1/13 Sat11/18/17 • 4 'i63 f 2.15.1.1 Engineering Design 188 days Tue 10/1/13 Sun 4/6/14 Engineering Design 2.15 164 2.15.1.2 P8rmn6rn9 365 days Mon 4/7/14 Mon 45/15 P4rmllttrg 2.15 165 2.15.1.3 Procurement 365 days rue 417115 Tree 4/5/16 • ,Procurement 2.15 • 166 2.15.1.4 Construction 582 days Wad 45/16 Set 11/18/17 I �Coesinecton 218 , -i 67 2.15.2 Cluster 2 1510 days Fri 5/1/15 Toe 6/18/19 ''168 2.15.2.1 Engineering Design 188 days Frl5/1/15 Wed 11/4/15 -Eng Insrmg Design 2.15 169 2.15.2.2 Permitting 360 days Thu 11/5/15 Thu 11/3/16 • • PsmdXing 2.15 . 170 2.15.2.3 Procurement 365 days Fri 11/4/16 Fri11/3/17 Procurement 2.15 .• _171 12.15.2.4 Construction 592 days Sa111/4/17 Toe 6/18119 Construction 2.15 • 172 2.15.3 Caster 3 1510 days Thu 12/1/16 Mon 1/1821 • 4 ' • 173 2.15.3.1 Engineering Design 188 days Thu 12/1/16 Tue 6/6/17 -Engineering Design 2.15 1742.15.3.2 Permitting 365 days Wad 0/7/17 Wed 8/6/181 Permitting 2.15 ''175___12.15.3.3 Procurement 385 days 11ru67/18 Thu 8/6/19 Pnoeumeent2.15 176 2.15.3.4 Construction 592 days Fri 6/7/19 Mon 1/18211 Construction 2.15 177 I 2.15.4 Cluster 1511 days Sun 7/1/18 Fd 8/1922 ♦ • 4 179 12.15.4.1 Engineering Design 188 days Sun 7/1/18 Fri 1/4/191, �►En91needIg Design 2.16 • •179...1 2.15.4.2 Pemdttuig 365 days Sat 1/5/19 Sal 1/420 PsnsMle9 2.15 tad 2.15.43 Procurement 365 days Sun 1/5/20 Sun 1/321 rscura Pnlsnt 2.15 . 191 2.15.1.4 Construction 593 days Mon 1/4/21 Fri 8/1922 Construction 2.15 •.192''' 2.16 Dswsiaing Building 1894 days Wed 6/1/16 Sat 8/7/21 4 183 2.16.1 Engineering Design 427 days Wed 6/1/16• Tue 6/1/17 Engineering Design 2.16 184 2.162 Permitting 365 days wee 62117. Wed 6/1/18 Permitting 2.18, 185 2.16.3 Procurement 365 days Thu 8/2/18 Thu8/1/19 •Proculmsn1216 -19-9- 2.16.4 Constructisn 737 days Fri82/19 Sat 8/721 tiiiiim Construction 2.16 167 2.17 Chlorination Fse86M 1460 days Tue 10/1/13 Fri 929/17 • 4 199_..1 2.17.1 Engineering Design 342 days Tue 10/1/13 Sun 9/7/14 �.Enginsrerg Design 2.17 189 • 2.17.2 Permitting 365 days Mon 92/14 Mon9/7/15 Psmnnheg2.17 i99-1 2.17.3 Procurement 365 days Tue 9/6/15 Tue 9/6/161 Pros-sermon 2.17 191-1 2.17.4 Construction 388 days Wed9/7/16 Fri 9/29/171 Construction 2.17 II 192 j 2.18 Odor Control Systems 1378 days Sal 10/1/18 Thu 7/9201 • ..193 i 2.18.1 Engineering Design 260 days S0110/1/16 Sat 6/17/17 -Engawsrieg Oss/gn 2.18 194 2.18.2 Permitting 365 days Sun6/18/17 0006/17/18 _Pemitteeg2.18 ' 195 2.18.3 Procurement 365 days Aon 6/18/18 Mon&17/19Procurement 2.18 198 2.18.4 ns Cotrucbn 388 days Tue 6/18/19 Thu 7/9/20 Consttucbn 2.18 Project Project Scheduling MSProjecl Task Progress Summery •Im1mmossfr External Tasks I t Deadline Dare:Wed 3/6/13 Split .,,,,,.,,.,,. Milestone • Proles'Summary 1.7------; External Milestone J Page 3 Page 816 of 1107 Case 1:12-cv-24400-FAM Document 25-8 Entered on FLSD Docket 06/06/2013 Page 4 of 7 Exhibit D2 Capital Work Plan with Milestones revised March 8,2013 1D ID �ITesk Name Duration Stud Finish .....j.201$...-...._.15013........_.124.14_. ..._..SS1.5........_..12.436..,.........2017..__.._.12418_7.........1,2..0.15......._.1.3434_.._,.....2.921. ..._.1....42022..._...._J2023�_...._...2024 ,....__..12025......._.. 2029........._X2227 M 197 Nom - Co-0en Moroi/molts .�_ - � _ � 170fi Cay......s 6rl%141__�9un 3/311/9J 7132 anylgr[.IuljO.i yy1.yrkjlulQc5Jw,pprZJUlrJct�Ient4aluljOctJ@:XP.iL 114 JJul<kt�l.@�r1.3u1.04/J@ 11/1•ulLOctJ09 p/,9a oJanA J8IOcb/an1.911)3521r@ VPS:Jul,OglJendprJJul,Qclsl�nf 114 ill4.9IJy,1. .lona il01Qy1„ 199.. 2.19.1 EngineMin9 Design 474 days Tim.91/14 Mon 6/17/15 ' IMMINNENN-Enp1neer1n9 DesIgn 2.19 -199 2.19.2 Permitting 365 days Tue 618/15 Tun 6/16/16 PenaMbrg 2.19 . 200 2.19.3 Procurement 365 days Wed8/17/16 Wed8/16/17 .Procurement 2.19 201 : 2.19.4 Construction 592 days Thu 617/17 Sun 3/31/19 tommEimm Construction 2.19 ''.202 1 2.20 Sspl.W Onloldk193tetlon 1311 days Thu 1111/18 Fr16r322 ♦ 4 203 1 f 2.20.1 Engineering Design 282 days Thu 11/1/18 Fri 82/19 ,Ergimwln9 Design 2.20 -204.. 2.20.2 Permitting 385 days Sat 8/10/19 Sat 8/920 Permitting 220 205 220.3 Procurement 385 days Sun 8929 Sun 8/9/21 Procurement 2.20 . 88. 220.4 Construction 299 days Mon 69/21 Fn 6222 Construction 220 207 2.21 Pump Station No.1 1118 days Sal 1011/18 Wed 1023/19 ♦ 4 208 2.21.1 Engineering Design 128 days Sat 10/1/16 Sun 2/5/17 Engineering Design 221 208 2.21.2 Permitting 365 days Mon 216/17 Mon 2/5/18 Permmlug 2.21 210 2.21.3 Procurement 385 days Tue 2/8/18 Tue 2/5/19 ��Proounmerd R.21 . 211 2.21.4 Construction 260 days Wed 2619 Wed 10/23/19 • �Construction 221 21 Y I 222 Pump Station No.2 1118 days Wed 10/1/14 Sun 1022/17 ♦ 4 ''213 i 2.22.1 Engineering Design 128 days Wed 121/14 Thu 2/5/15 Erghwerkg Design 2.22 214 2.22.2 Permitting 365 days Fd 2/6/15 Fd 2/5/16 Permitting 2.22 215.1 2.22.3 P/oouremelll 385 days Sal 2/6/16 Sal 2/4/17 Procurement 2.22 216 2.22.4 Cansirection 280 days Sun 215/17 Sun 1022/17 aming Conslrucibn 2.22 217 223 02 Plant Process Controls Phase 2 1258 days Tue10/1/13 Thu 34117 ♦ • 216 223.1 Engineering Design 125 days Tue 10/1/13 Sun 2/7114 Englnserlrg Design 2.23 • -219.- 2.23.2 Permitting 365 days Mon 2!3114 Mon 2/2/15 Pemdging 2.23 220 2.23.3 Procurement 365 days Tue2/3/15 Tue22/16 • Procurement 223 • ' 221 2.23.4 Construction 401 days Wed 2/3/16 Thu 3/9/17 joiggemp Construction 2.23 ' -- 222' 2.24 Iles Monitoring gnd Mama 993 days Thu 1/1/15 Tue 9/19117 ♦ • ...2 ... 2.24.1 Engineering Design 63 days Thu 1/1/15 Wed 3/4/15 • .Englnsedrg Design 2.24 . 224 2.24.2 Permitting 385 days Thu 3/5/15 Thu 3/326 Pemd0pg 2.24 225 I 224.3 Proeuremenl 385 days Fri 3/4/16 Fri 39/17 ProcuwnMnl224 '_22g I 2.24.4 Canstruclon 200 days Sat3/4/17 Tun 9/19117; Construction 2.24 ..227..' 2.25 VeruOation Improvements 1519 days Fd 1/1/21 Thu 227251 ♦ • 228 1 2.25.1 Engineering Design 186 days Fri 1/121 Wed 7/7/21EngInesdng Design 2.25 229 2.25.2 Permitting 365 days Thu 7/021 Thu 7/722 - Permitting 2.25 230 225.3 Procurement 365 days Fri 79/22 Fri 7/7/23 ,_Procurement 2.25 • 1312.25.4 Construction 601 days Sat 72/23 Thu 2/27/25 Construction 2.25 232 2.26 Rehabilitation of Walk/eys end%skways 5110 days Tue 10/1/13 Mon 92727 ♦ 4 • • 233 2.26.1 Construction 5110 days Tue 10/1/13 Mon 92727 Cen9mellon 2.2 234 227 Oxygen Production 1825 days Thu 1/1/15 Mon 12/30/19 ♦ • -1311 2.27.1 Engineering Design 385 days Thu 1/1/15 Thu 72/31/151 � ee .Erglarkg Design 2.27 296 I 2.27.2 PennYtig 385 days Fd 1/1/16 Fri 12/30/10 6111111111111.1Perming 2.27 -5-i•- 2.27.3 Procurement 385 days Sat 1291/16 Sat 1226/17! jProcurerrent 2.37 238 2.27.4 Construction 730 days Sun 12/31/17 Mon 1220/191 Cmmonemmem onstruction 2.27 239' 220 SCADS RTU 5en Upgn180 days Toe 121/13 Sal 329/14 1, 11 240.6/ 2.28.1 Consuudion 160 days Tue 10/1/13 Set 329/14 gimp Construction 2.26 . _ 241'i 2.29 Nigh Strength Inituenl hsgol Study 540 days Tue 1/1/13 Tug 624/14 r, : 242 2.29.1 Engineering Study 540 days Tue 1/1113 Tue 624/14 Engineering Study 229 •. 243 1 3 North District R6R 5349 days Tue 1/1/13 Tue 82427 ' M, •' -T44-1 2441 3.1 Headwodu and Sludge Degrimnp 6 Transfer 1923 days Tue 1/1/13 Sat 4/7/18 ♦ . 4 ' • ..245 j 3.1.1 Engneerug Deeipn 270 days Tue 1/1/13 Fri 927/13 Engineering Design 3.1 •' • •246..I 3.11 Penndti g 385 days Tue 10/1/13 Tue 9/30/14 PemmtIng 3.1 -247 1 3.1.3 Procurement 365 days Wed 10/1/14 Wed 930/15 Procurement 3.1 -_248 1 3.1.4 Construction Phase l:Screens 450 days Thu 121/15 Fri 1223/16 Construction 3.1 Phase/ 26/9 3.1.5 Constmcaon Phase 2:Bolding Improvements 920 days Thu 16/1/15 Sat 4/7/18 Constmcllon 3.1 Phase 2 250 1 32 Pshnory CluttM,and Odor Control 1996 days Sun 11/1115 Sun 4/18/21 251 32.1 Engineering Design 215 days Sun 1111/15 Thu 6/2/16 umin.Erglnsrd0g Design 3.2 • 252_ 3.2.2 Permdln9 385 days P1/6/3/16 Fd 62117 �1y1Perm8IM9 32 _32,32 33 3.23 Procurement 385 days Sal6/3/I7 Sat 62/18 meuremen • Pt 3.2 ..254 I 3.2.4 Construction 1051 days Sun 69/18 Sun 4/18/21 • t Cons[mclion 3.2 255] 3.3 Oxygenation Train 1843 days Tu91/1/19 Wed 1/17/24 ♦ • 258 I 3.3.1 Engineering Design 287 days Tue 1/1/19 Man 1014/19 -Engineering Design 3.3 ' 257 1 33.2 Permitting 385 days Tun 10/15/19 Tue 10/13/20 Permitting 33 .....8 5.....1 2I 3.3.3 Rocorement 365 days Wed 10/1420 Wed 10/13/21 ProcurNrrm 3.3 _.259 259 3.3.4 Carstruction ... 826 days Thu 10/14/21 Wed 1/17/24 Construction_______._..._............................................_....._._.__.. Project:Project Scheduling MSProjecl Teas UIMMMIP Piogre.a Summary 11ill �11 External Tasks DeadFle Date:Wed 3/6/13 SDN Weave • Project Summary "--- External Milestone Page 4 Page 817 of 17u7 Case 1:12-cv-24400-FAM Document 25-8 Entered on FLSD Docket 06/06/2013 Page 5 of 7 Exhibit 2.2 Corbel Work Plan with Milestones revised March 8,2013 ID 1 ID 'Task Name i Duration start tI Finish , ....12012-,_......j8p.}�...... ....102p..,....,.....i8015 120]6......._..12017.......__l.?414..,....7....12910......._.m0...,._,._..2/2.421.............�2022_�...,....L2023�.___._L{�2 O4..._...u 2.m.._._.................................... ..__....NV/Sql) .._._. ..__.. ......... .......I..... ........I........._...._L_ ___-_._J.41_OclJenihp/1JPI�OcIJen 1J41j 1JanAAit4pin IJenApr�JulociA4p_vpr(Jul Oc7Jenjip Julo gAff_Ag�Julpcl-.la;ja_prLJ,tl1'A-c.{JertJ 4.y..10�1-.jenAprlIVI.QSWanAp!LJ410ct.J,enApgJulgglitg.. Pr r1_IoclJadApriaTco rivAJyi .A@r�,Apr,J41-Q2t 260 t 3A Oxygen Production 1382 days Wed 4/120 Fri 1/1224 • • 261 3.4.1 Engineering Design 261 days Wed 4/120 Thu 12/1720EngineerN,9 Design 3.4 262 3.4.2 Permitting 385 days Fri 12/1820 Fri 12/17/21 �,P9rrn11iln93.4 263 3.4.3 Procurement 365 days Sat 12/1821 Sat 12/1722 Prom/mmment 3,4 ' 28<"1 3.4.4 Contraction 391 days Sun 12/1822 Fri 1/1224 � 1.Construction 3.4 "'285"1 3.5 Secondary Clarifier. 3189 d.yS Sal 12/1/16 To 8/2427, • 288 1 3.5.1 Engineering Design 433 days Sal 12/1/18 Thu 2/6/201 Engineering Design 3.5 -.2-C7-1 3.5.2 Permitting 365 days Fd 2/720 Fri 215/21 Pemrllling 3.5 -2001, 3.5.3 Procurement 365 days Sal 2/8/21 Sat 28/221 Procurement 3. 5 269 I 3.5.4 Construction 2026 days Sun 2/522 Tue 824271 Construction 3.5 270 i 3,8 Disinfection 1317 days Wed2/1/17 Wed 9/9/201 • 4 2-7.1.1 3.6.1 Engineering Design 65 days Wed 2/1/17 Thu 4/6/17 Engineering Design 3.6 "'272 i 3.6.2 Permlitbg 365 days Fri 4/7/17 Fri 4/6/16' Permitting 3.6 273].. 3.6.3 Procurement 385 days Sat 4/7/18 Sat 416/191 ..Procurement 3.6 "271 3.8.4 Consinuclbn 522 days Sun 42/19 Wed 9/9/20 Construction 3.6 275 3.7 Effluent Dlspoeel 2220 days Tue 12/1/15 Tue 122821 • • 270 3.7.1 Engineering Design 287 days Tue 12/1/15 Mon 9/12/16 Engineering Design 3.7 277 3.7.2 Permitting 365 days Tue 9/13/76 Tue 9/12177Permitting 3.7 Procurement 385 days Wed 913117 Wed 9/12/10 Procurement3.7 • 279 3.7.4 Construction 1203 days Thu 9/13/16 Tue 12/28/21 Construction 3.7 260 3.8 Plant Wide Electrical 3215 days Fri 11M/13 Sat 8/20/22 • • '291' 3.8.1 Engineering Design 1177 day° Fri 11/1/13 P1/1120117EnglneeHrg Design 3.8 ' Permitting 385 days Sat 11/17 Sat 120/18 Permitting 3.8 '283 3.8.3 Procurement 365 days Sun 1/21/18 Sun 120/19 Procurement 3.8 204 3.6.4' Comtruclbn 1308 days Mon 121/19 Sat 8/20/22 _ , Construction 3.8 "285' 3.9 Flood 1382 days Fri 11/1/13 Sun 8/13/17 • 4 '286 3.9.1 Engineering Design 391 days Fri 1111/13 Wed/128/14 Engineering Dul0n 33 '207 3.9.2 Pertaining 385 days Thu 1127/14 Thu 1126/15 • Permitting 3.9 • . 288 3.9.3 Procurement 365 days Fri 1127/15 Fri 11/25/16 Procurement 3.9 289_ 3.9.4 Conduction 281 days Sm 1126 16 Sun BM3 17 Construction 39 280 3.10 Yard Piping Replacement 2226 days Sun 11/1/15 Set 12/421 . • . 291 3.10.1 Engineering Design 344 days Sun 11/1/15 Sun 109/18 • Engineering Design 3.10 '292-1 3.10.2 Permitting 365 days Mon 10/10/16 Mon 109/171 P.metbg 3.10 . 293 ; 3.10.3 Procurement 385 days Tue 10/10/17 Tue 10/9/181 Procurement 3.10 294 1 3.10.4 Construction 1152 days Wed 1000/18 Sal 12/4211 Construction 3.10 295 3.11 SC4DA RTU Upgrade. 540 days Tue 10/1/13 Toe 321/151 ^meg 296 3.11.1 Construction 540 days Tue 10/1/13 Toe 324/15 -Construction 3.11 297- 4 Waterman Collection I Tninemdesbn Line 5475 days Mon 10/1/12 Mon 927271 • . • 298" 4.1 Collection System M Repairs 5110 days Tun 10/1/13 Mon 9127271 • • 299 4.1.1 Construction 5110 days Tue 191/13 Mon 92727 Construction 4.1 "390' 4.2 Government Cut FM-Phase 1 a 2(Construction 385 days Mon 10/1/12 Man 9/30113 ^eeae�• 00091ng) 301 42.1 Constnction 365 days Mon 10/1/12 Mon 9)39131 mom=Construction 4,2 392" 4.3 Goeemnenl Cut FM-Phew 3 1651 days Mon 10/1/12 5014/6/171 • 4 .-30-3-1 4.3.1 Engineering Design 219 days Mon 10/1/12 Tue 5/7/131 Engineering Design 43 - 354 1 4.3.2 PermU'ng 365 days Wed 5/8/13 Wed 5/7/14 Psnnhlhg 4.3 305'.j 4.3.3 Procurement 365 days Thu 5/5/14 Thu 5/7/15 Proeunmen14.3 • 308 1 4.3.4 Construction 702 days Fri5/915 Sat4/8/17 • Construction 4.3 907"1 4.4 North Dad.72 Inch PCCP FM Rehabilitation 1617 days Tue 10/1/13 Mon 3/5/18 • 4 . • '388::1 4.4.1 Engineering Design 157 days Toe 10/1/13 Thu 316/14 nw Engbrhg Deign 4.4 '309 1 4.4,2 Permitting 365 days Fri317/14 Fri3/6/15 Permitting 4.4 • 31� 4.4.3 Procurement 365 days Sa13/7/15 Sat 3/5/16 .Proeunen14.4 • 311 4.4.4' ' rr 'Construction 730 days Sun Mon Construction 4.4 . -372 1 4.5 South MM 51 loch PCCP FM MlMbllllatbn 1519 days Tue 10/1/13 More 11/27/17 • '313.1 4.5.1 Engineering Design 188 days Tue 10/1/13 Sun 4/6/14 Engineering Design 4.5 • "-i/4 4.52 Permitting 365 deyr. Mon 4/7/14 Mon 4/6115 •Permitting 45 . 315 1 4.5.3 Procurement 365 days Tee 4/7115 Tue 4/5/16 ,_Procurement 4.5 '.3c0-1 4.5.4 COWOnuIbn 601 days Wed418/18 Mon 1127/17 -Construction4.5 • '317 1 4.6 Replacement 91 TandeN Canal aerial crossing FM..1 1125 days Tue 10/1/13 Sat 1029/16 • • NW 37 Ave 318 1 4.6.1 Engineering Design 94 days Tue 10/1/13 Tao 1/2/14Ergineeri g Design 4.6 319 i 4.62 Perm0Ong 385 days Fri1/3/14 Fri 1/2/151 � ,Pemsitting 4.6 � 320 : 4.6.3 Procurement 365 days Sat 1/3/15 Sat 1/2/18 Rocurerien 4.6 321 i 4.8.4 Construction 301 days Sun 1/3/16 Sat 1029/181 Immo Construction 4A .............................._................._._......._.........._..._...._.. ....----......_..........._......_..._......_.........-- Project,Project Scheduling MSProlecl Task Progress rimeremsemr Summary ....... ... M External Tasks insweiramisi Deadibe " Date:Wed 3/6113 SOD Milestone ♦ Project Summary 7---'--"7 External Milestone 9 Page 5 Page 81'8-011707 Case 1:12-cv-24400-FAM Document 25-8 Entered on FLSD Docket 06/06/2013 Page 6 of 7 Eah89 0-2 Capital Work Plan with Milestones revised March B.2013 10 I ID Task Name Duration Sled I Finish __-I.7012-r1,50.13_.I 18.0514 ...-_1610..x._ ....17418_ .-_..12017. 1 2410.r-.._...I.$Q(9........_-j2P2P.._.-__2021.__---..-_12022...,_..r...Inn23_ r A2489.. ,...i3P.85.._.._._.12025_._ � ,_..- Nynb4rl... .. .. ......... ...._........_..._.... .I... .............I.._.___..._ L..___... 4P.13nk 9t9RI��1P16+c�3a:A l4..I P3JPIQc1JenAPrLulpc.IJarIZpr4mr.L:jtpr(JS+.SIJ..@MP1�1ull irlan.441uI�OcIJ@nARN.1 IrIan6911,4 P91).0nykvlJu.I.Qe1J AppJulclJ..AprFlul clJenAPr.Jl�QciJeOtkit7J�iI1514Ja P_L41QSq 322 4.7 Rplacsm.nl of 18 Inch DIP FM In Mind fakes" 1256 days Fd 11/1/13 Sun 45/17 • 4 323- 4.7.1 Engineering Design 125 days F811/1/13 •Wad 3/5/14 emB,Enginwdrrp DMgn 4.7 • 324 4.7.2 Permitting 365 days Thu3/6/14 Thu 3/5/15 Pemm8ng 4.7 325 4.7.3 Procurement 365 days Fd3/6/15 Fri3/4/18 .Procuwnt4.7 • 326 4.7.4 Construction 401 days Sat3/5/16 Sun 45/17 mmConstrucllon 4.7 . 927 4.8 R.h.bllitstlon 0154 Mch PCCP FM M the City of MO.ml 1258 days Fd 11/1/13 Sun 45/17 • - 4 • -328 1 4.8.1 Engineering Design 125 days Fd 11///13 Wed 3/5/14 .P Iglnprt g Design 4,8 329 f 4.6.2 Permitting 385 days Thu 3/6/14 Thu 315115 .Permlliing4.8 • 330 { 4.8.3 Procurement 365 days Fd 316/15 Fd 314//6 Procurement 4.8 • 331 I 4.8.4 Construction 401 days Sat 3/5/113 Sun 419/17 Construction/.8 • 332 4.8 Replace Approximately 30 miles of AC FM 2168 days Fd 11/1/13 Tiro 105/18 • 4 Tranandnlon System . •333•I 4.9.1 Ergineadng Design 343 days Fri 11/1!13 Thu 105/14 En9inearhlp Dos160 4.9 • 9341 4.9.2 • Permitting 305 days Fd 10/10/14 Fri 105/15 -Ps1m8tMg 4.9 --3511- 4.9.3 Procurement 385 days Sat 10/10/15 Sat 10/8/16 ' PrownlMnl4.9 338 I 4.9.4 Construction 1095 days Sun 105/16 Tun 10/8/19 y Construction 4.9 • 937 1 4.10 Ope•Locke Airport 46"PCCP force main r.plscernsnl 1550 days Fri 11/1/13 Sun 126/18 4 • 338-1 4.10.1 Enabler/dng Design 270 days Fd 11/1/13 Mon 728/14 ammuEnginsertng Doslgn 4.10 • 339 4.10.2 Permitting 365 days Tue 729/14 Tue 728/15 Permitting 4.10 340 / 4.10.3 Procurement 365 days Wed 729/15 Wed 727/16 Pr0c0rsrrrsn14.10 - 1 I 344.10.4 Connlctbn 550 days Thu 728/18 Sun 128/18 1�Construction 4.10 ..342 5 sewer Pump Station System 2303 days Mon 1018/12 sun 127119 10=' • ..343--1 5.1 Upgrade of PS/0418 1650 days Fri 11/1/13 5.11124/18 ♦ • 344 I 5.1.1 Engineering Design 218 days Fri 11/1/13 Frl8/6/14 EngMsaring Design 5.1 . 345 5.1.2 Permitting 365 days 98167/14 Set 6/6/15 Permitting 5.1 946.1 5.1.3 Pracuremenl 365 days Sun 67/15 Sun 6/5/16 an Procurwn15.1 347 : 5.1.4 Construction 902 days Mon 6/6/16 Sat 11/24118 COnstrucOan 5.1 348,,.1 5.2 Upgrade of PS00691 1914 days Fri 1111/13 Sun 1/27/19 ► 4 349 t 5.2.1 Engineering Design 282 days Fri 11/1/13 Sat 85/14 Engln..drg Dmign 5.2 350 I 5.2.2 Permklkg 365 days Sun 8/10/14 Sun 8/9/15 P.18508195.2 351 1f 523mm Procurement 365 days Mon 8/10/15 Mon 8/6/18 Proeun15.2 .352 5.2.4 Construction 902 days Tune/8/16 Sun 127/19 Construction 9.2 353.,/ 5.3 Upgrade of PS80692 1914 days Fd 11/1/13 Sun 127/19 11 354 1 5.3.1 Engineering Design 282 days Fri 11/1/73 Sal 8/9/1481111111111Englrleerkg Dmign 5.3 355 1 5.3.2 Permitting 365 days Sun 8/10/14 Sun 95/15 PwrM0hg 5.3 358 1 5.3.3 Procurement 365 days Mon 8%0115 Mon 6'8/181 61.111111111111111.Procummant 5.3 -957 1 5.3.4 Conslrucfnn 902 days Tue B/9/16 Sun 1127/191 C4n41ru6041 5.3 358 1 5.4 Replacemsm of Switchgear PS40414 1851 days Fri 11/1/13 Mad 55/181 .959 .1 5.4.1 Engineering Design 219 days Fri 11/1/13 Sat 6/7/14 Erigimer819 Design 5.4 3660 ./ 5.4.2 Perm6519 365 days Sun 69/14 Sun 6/7/15f l�.Parret819 5.4 361 5.4.3 Procurement 365 days Mon 69/15 Mon 6/6/16/ Procumnen1 SA 362 5.4.4 Conatruct'n 702 days Tue 6/7/16 Wed 55/181 Construction 5.4 363 5.5 Rsplec nwm of Sy/Nahum and RehebIIOation of 1914 days Fd 11/1/13 Sun 127/19! l► W.bwdl PS90415 984 5.5.1 Engineering Design 282 days Fri 1111/13 Sat 8/9/141 Englrleekg Design 5.5 385 55.2 Permitting 385 days Sun 8/10/14 Sun 85/151 P.mamng 5.5 356 5.5.3 Rocuremam 365 days Mon 8110/15 Mon 8/8/161 Procurwnent 5.5 387 5.5.4 Construction 902 days Tue 8/9/18 Sun 127/19 I /Construction 5.5 3685.4 Replacement of Switchgear PS40418 1851 days Fri 11/1/13 Wed 55/181 909 5.6.1 Engin/wing Design 219 days Fri 11/1/13 Sat 6/7/14Deaim,5.6 370 I 5.6.2 Perm81in9 365 days Sun 6/6/14 Sun 6/7/151 Permitting 5.6 5i I 5.6.3 Procurement 365 days Mon O/8/15 Mon 6/6/16 Prxusen15.6 372 I 5.6.4 Construction 702 days Tue 82/16 Wed 5191181 � mConstruction 5.6 -973 1 5.7 Rep1.nwNnt of Switchgear and Rehabilitation of 1914 days Fd 11/1/13 Sun 1/27/19 t► Wetwe0 PS00417 Engbnering Design 282 days Fd 11/1/13 Sat 89/14 FJgM.wtg Dnlgn 5.7 375 j 5.7.2 Perm5169 365 days Sun 8/10/14 Sun819/15 Permitting 5.7 376 1 5.7.3 Procurement 365 days Mon 8/10/15 Mon 8/8/16 ;Proeumment 5.7 377..I 5.7.4 Construction 902 days 7.8/9/16 Sun 1/27/19 Comoucfkn 6.7 . 378 I 5.B Rpl.cenrent of EI.OBk9l and M.efunlol Equlpnwm 1914 days F1111/1/13 Sun 127/18 • In PS80007 ' 379 5.8.1 Engineering Design 282 days Fd 11/1/13 Sat 89/14 .ErgMeedrg Design 0.0 380 5.82 Perminkg 385 days Sun 8110/14 Sun er9/75 Permitting 5.8 Project:Project Scheduling MSProjecl Tash 1111111111111 Negros Summery -.,. External Tasks Deadlne -• Dale:Wed 31113 Spa MOeston° • Project Summary :1---'11.-----D Eaternal Milestone O Page 6 Page 819 of 170 • Case 1:12-cv-24400-FAM Document 25-8 Entered on FLSD Docket 06/06/2013 Page 7 of 7 Exhibit 0.2 Capital Work Plan v55 Milestones reseed Mama 6.2013 • ID 1 ID heck Name 1 Duration Start I Finish ....3.2012._.....42.013..,....._...12011..... 2015 ....L20!9..__........12017........_41.1?_.. (?4.10..,.........1292.0................ .1_...........i2?22.._....__1.2023 j20.2.1..._..__.._20$5...;...,..._2026�.....1.... ,x..27......_....:..00 ........._iNumber I n I ............_..1............___._ JulQclJpry'Wr1Ju100•18 Agr•,J I OcIJen11pr1JuIOs�1�5/4ps40r,[Jing)OjJpnAWfJylQcl,lariAr.WuljOclJan r�Jull)ctJo1Apr:Jul J80A7r4mt OciJandpr:JuIOolJenApr;Jul,OclJa Ap'.110nJprtApr_JulbcIJmg�pr Jui.... ...Qct. ............_.._.. _.. ..r.. days' _-' 381 S B.3 Procurement 385 tleys Mon 8/10/15 Mon 8/8/16 .010100.111510 382 1 5.8.4 Construction 902 days Tue8/9/16 Sun 1/27/19 1 I Construction5.8 383 I 5.9 Replacement of Pinning and EYetrleal Equipment at 1651 days Fd 11/1/13 Wad 5x9118 ♦ / P 40301 384 J 5.9.1 Engineerbg Design 219 days Fri 1711/13 Sat 6/7/14Enpkrnrkg Design 5.9 385 i 5.9.2 Permilitrlg 365 days Sun 618/14 Sun 6/7/15 .Permitting 5.9 -IRE 5.9.3 Procurement 365 days Mon 6/&15 Mon 8/6/18 issummgProcuran1n15.e • •387 5.9.4 Construclbn 702 days Toe 8/7/16 Wed 5517 B 1111111 Construction 6.9 . •388 5.10 Upgrade of P990489 1651 days Fd 11/1/13 Wed 5/9/18 ♦ 47 •368 5.10.1 Engbeerig Design 219 days Frl 11/1/13 Sat 677/14 am.Engineering Design 5.10 • 390 5.10.2 Permitting 365 days Sun 6'8/14 Sun 6/7/15 Pnmtning 5.10 ....-39.1-. 5.10.3 Procurement 365 days Mon 6/8/75 Mon 6/6/16 Proeuremant 5.10 992 5.10.4 Construction 702 days Tue 617/16 Wed 5/9/18 Coo,5U09on 5.10 • 393 5.11 Installation 8160 Inch FM from Kendall Dr to PSi0538 1651 days Fri 11/1/13 Wed 5/9/18 ♦ 394 5.11.1 Engineering Design 219 days Fri 11/1/13 Sa16/7/14 simg..Engbealbg Design 5.11 . 795 5.11.2 Permitting 365 days Sun 65114 Sun 6/7/15 Pemett5g 5.11 ...3 5.11.3 Procurement 365 days Mon 65/15 Mon 6/6/161 .Proctaan.nt 5.11 397.J 5.11.4 Comtructbn 702 days Tue 8/7116 Wed 59/181 Construction 5.11 398 , 5.12 Replacement of Sncchgsar at PS//0187 1651 days Fri 11/1113 Wed 519/18 399 ' 5.12.1 Engineering Design 219 days Fri 11/1/13 Sal 6/7/141 En9kwMlg Design 5.12 400"i 5.122 Permitting 385 days Sun 6'6/14 Sun 6/7/15 Parm9UrrB 5.12 401 1 5.12.3 Procurement 365 days Mon 6g/15 Mon 6/6/16 Procurement 5.12 492.'1 5.12.4 Conetruclbn 702 days Tue6/7/16 Wed 5/9/18 -Constmgbn 5.12 -403 5.13 Refurbish Emergency Generators and Controls d 993 days Fri l 1/1/13 Wad 7/20118 ♦ Rp16091 Purltpatatbma • 404 i 5.13.1 Engineering Design 63 days Fri 11/1/13 Thu 1/2/14 •Engineering Design 6.13 405- 5.13.2 Permitting 385 days Fri 1/3/14 Fri 1/2/15 Pemdnln9 5.13 406 5.13.3 Procurement 385 days Sat 15/15 Sal 1/2/16 Procurement 5.13 • 407 5.13.4 Construction 200 days Sun 1/3/16 Wed 726 0/1Constrectlen 5.13 .• • 408 6.14 Upgrade of P50 0699,0492 450 days Mon 105/12 Teo 12/31/13 (pssaee.. '409 5.14.1 Procurement 180 days Mon 105/12 Sat 42/13 ,Procurenrn15.14 .4i0 5.142 Conetruclbn 270 days Sat 4/5/13 Tue 12/31/13 0.11111.11 Construction 5.14 1 . -.Fr. 5.15 Upgrade a1 P010065,0201,0334,0374,0607 730 days Wed1/1/14 Tau 1291/15 gylotiiimigi -412 1 5.15.1 Engineering Design 190 days Wed 111/14 Thu 7/10/14 mingnglneerIng Design 5.15 413 1 5.15.2 Permsteg 90 days Tau 7/10/74 Wed 105/14 • ?wetting 5.16 -414, 5.15.3 Procurement 180 days Wed 10/1/14 Mon 4/6/15 1.a...4!r0Ntemen15.15 415 5.15.4 Conon/seen 270 days Mon 08/15 Thu 1291/151 rimigmaConebualbn 5.15 416 6.16 Upgrade of P900196,0437,0466,0680 730 days Fri 1/2/15 gat 12/31/161 -417.1 5.16.1 Engineering Design 190 days Fd 1215 5417/11/15 gagfalySErigineering Design 5.16 .418_ 5.162 Permitting 90 days Sat 7111/15 Fri 10/9/15 t jMmMing 5.161 .-4T9-1! 5.10.3 Procurement 180 days Fri 109/15 Wad 4/6/16 ( 4'aOcoremsnt 5.16 '420'1 5.15.4 Construction 270 day. Wed 4/6/16 Sat 12/31/16 , isilm.11.Con.tructIon 5.16 . 424 J 5.17 Upgrade of PS10037,0351,0370,0103 730 days Sat 12116 gun 1791/17 _ 428�1 5.17.1 Engineering Design 190 days 5511216 Sun 7/10/16 l ming4Fyo8lnaadng Design 5.17 423 I 5.17.2 PermlOhg 90 days Sun 7/10/18 Sat 105/16 iillipeennitting 6.17 ' 424 f 5.17.3 Procuremem 160 days Sat 105/16 Thu 45/17 l�P/IaeurerrMm 5.17 -425 5.17.4 Construction 270 days Thu 4/8/17 Sun 1231/17 'tCpnstrucibn 5.17 -426 5.18 Upgradeof P910441,0191,0710,0827,0652,1236 730 days Sun 111/17 Mon 12/31/18 • • .42i._11 5.18.1 Engineering Design 190 days Sun 1/1/17 Mon 7/10/17 �frnlpiteertrr9 088461/5.18 428- 5.18.2 Permitting 90 days Mon 7/10/17 Sun 10/8/17 • 'welml9mp 5.18 -429 ; 5.18.3 Procurement 180 days Sun ID/8117 Fri4/6/18 l.00mptProcarwnsnt 5.18 430 .1 5.18.4 Construction 270 days Fri 4/6116 Mon 12/31/18 • .1.111111111.1 Construction 6.18 431__j 5.19 SCADA RTU Upgrades 900 days Tun 15/1/13 Fd 3/16/18 • 432 11; 5.19.1 Construction 900 days Tao 10/1113 Fri 3/18/16 Conaauclbn 5.19 Project:Project Scheduling MSProject Task Progreso emillei Summary 11Mii ..........Mi External Tasks 1 I Deadline '1 Date:Wed 3/6/13 Spia Malone • Project Summary "-----. External Mgeslone.: Page 7 Page 82U'&17Uy Case 1:12-cv-24400-FAM Document 25-9 Entered on FLSD Docket 06/06/2013 Page 1 of 1 Ephib3 D-3 Capital Project C05t1 In 201240171750106.32%3.2%Inflation slatting in Fiscal Year 2014.2015 Project No. n 64 eo014ear 1112 PI1213 FT 13 FY FY 1PI Y 641415 6 Fe 1611 7.18 ]613 i 1930 74377 FY 1131 F427.23 FY 2114 FY 3115 FY 11.26 642637 76%1 e 1.1 neadrh - - 41.939 6538 154 02 372.07 153,116 - - • 728.343 1.1 011470 7r441104, - 391,105 305.333 349,932 3,37801 1321558 - - - • 7549529 1.3 0399e74305Trains • - - 910.149 210,883 1,312,071 2,155,7M2.327,355 1,333.075 1479.328 2.313.669 2,60544 1033873 18.321,319 1.4 CModne32006q • - - 148.232 21,135 960,230 1,390501 - 2520.757 1.5 %Went Pump 600130, • . - 115,103 1.338.685 323.343 3.960,610 9.033.019 9.294,577 4,966818 27,010.183 50333910 1.6 69309588270970549411 272475 71.935 263563 2.199.141 2.333,710 5.146.274 1309 1.7 a4e492and Control 32O193F 2.450,906 590.571 1.88,491 3.133074 3130.949 3649.139 8.950,366 9.111.543 729,151 43332.231 1.8 60w41169Fadfity 259,953 635,556 133,416 1,651,363 5,840,441 3027,336 1,005469 - 16.60.534 2.9 FOG Removal 1401159 61.180 3604 219033 541,7% 104.39 - 913,377 310 Mb Control - - - 443,513 94.217 3051540 4.115.99 2420817 8.130067 1.11 General 01491021 • - - 6968 121,643 2164,136 6103975 3092789 - 11165,144 1.12 Chlorine Contact Chanb05bwns% . . 9826 316825 56,681 3,334337 2906,135 2,168,155 - 6,935,91 153,1%868 2.2 003048 lm 9745..45n - 1533.061 125834 30391432 16,231943 • - 38.392,161 22 593003175p714e15e38 258.096 116,239 4,345 5.440.696 - - • - 5,373576 13 x4adwr63(UM 1 1.191.09 273.958 2475,39 15803.377 983.013 - - 10,637859 24 1180314834702102 510.79 727956 139,431 9,1161317 10.384.926 - 20891336 2.5 OeyeewOa Train,Plant 3 352,796 98,579 - 1,156,909 3.370.5516.883,96 2.6 030431139 1340.11710 2 790,684 222,050 491555 3,063817 3,683324 3,94190 3302.915 15957,546 2.7 Secondary 02719e9 710 l - - - - - 236,638 60.990 1,064 1541,485 1.608.439 2450,115 4949145 1.3 5e6.9192m 0r10en Plant 2 224.628 213,187 19397 110409 1977.561 1,417.758 149,227 1.035,483 - - 7.342320 19 90239Madan 3l41 - - - - - 454378 355332 2401 1,958,554 3.037,053 2.784340 9,441453 1.10 RSPump Station Plant 1 443831 422,243 39324 2,154,]4] 2,711973 201.407 2891152 2,836,431 - 14,310,201 0.11 Effluent Pump%%ion - 552.191 113.655 2,262.760 649.518 - • 9,916,072 2.12 54.4.115%113e,e1182010 - 513198 1116,79 2,456 6570.272 3853034 - • 11.156,20 213 54dR1Ndunen1443 561,191 77,681 2.739338 5.796331 376,975 - 9,552313 2.14 014m0s341 - - - 1207.784 )9.764 1776444 15313466 17.991.722 12681.583 5,612977 , 9,6&546 Centra 000,10, WWIP 2.15 94e06130t2 1.666,295 445289 1,084,536 13242999 16822,982 19,344453 19.271.920 19.429.354 27.003,419 121,761%8 2.16 04400696282404 - 1,393,175 31343.932 1,02.317 2193116 45085816 40.23319 - 99.952854 2.17 04a454937{1240083 867,598 247,011 936.785 11661561 - - • _ 16.733.956 1.28 Odor 037414504311 - 1,125.39 213456 4,986019 13.863541 • - 2000323 2.23 co-Gen 512078 429041 1.092.598 17016 2,070850 17332.219 3919.19 - • 30.311,204 2.20 580443e1311034414 - - - - 1549.079 393,513 4,683,534 21.431913 - 29461.616 • 2.21 Pomp Station • - 712,605 65,661 9805,232 99.013 - 12375.513 120 Pm,594Um2 • 335.348 00,374 4,59,610 439,919 - 5.371.361 223 02 Plat 709,133Cans 7764142 19,932 2,651 367,233 183,093 - - 4909 1.24 Gas Montor614 - 20.571 2.306 311,036 - - - - - 334,913 125 entilationlorpw.eme5n - - - - - - 250050 33.311 352802 3.567.735 663.075 2.766.973 223 6398613400102W.]IwWs and Mang, 155,070 163031 365806 s 170538 1751392 181521 157,843 193.324 19511 295,355 113066 219.243226.300 131822 2.685405 227 0418e40,0033400 - 935.349 643.363 304.942 9,076,704 12477452 3,230,19 - 26503.191 2.28 50100 61111.14/141e5 396.09 - - - - • . • . 396,160 2.19 roan 1.0,701441.322475 14714 Sway 780,79 7,640 - - - - 1,544,400 5%,333296 31 3e140013110511319e 00119043r435525 3639,000 491899 17.007.686 901560 3,507930 - - - 31,777,875 12 7,670304111814and Odor Control 3.612,761 494,122 4,619304 15,159.812 15.9279 2.046.004 - - - - 426%971 13 0433e4303810871 - - 1210,471 466.019 15,199 10,447156 11,129,751 3,445446 - 36314.143 3.4 0433101120938 - - - - 252,039 193663 23.575 4,133,153 2.323,747 7.139,589 3.5 Second07C1018m • - - 2,93.973 1,951.120 479,933 8.038951 13,091.]17 23.550.772 13.906238 14.332466 13.347.376 31845.501 566 a4via 3.6 80137741137 • 2.103,617 151441 6,799,972 11666.7% 20.721,]09 WIPP . 3.7 Effluent 0170310 1372.663 338.223 359,972 7.533,010 7.795.365 8.011837 2018.353 27,500829 13 Rant 004e6e1$iOl 140034 275.117 280,09 183090 9,794 3.251.97 4854.550 4.996.107 4526.99 • 19859.669 39 Had 40041000 182928 90573 10.977 43338.111 - - - • 4,327,59 3.10 7003343134012080581't - - 234313 79,320 1,900 1367,339 1.450.730 1433463 074,396 - 190139 311 901038117%453de2 9369 397320 - . - • 1.19,310 270,523817 43 C465044157114nt11030312 969,91 3.056,371 8,543516 3.791,879 9.94130 9,364,584 9,638719 9,971,507 10,192659 10821024 10.93199 11311.711 1494,718 11949,282 138.538,762 4.2 0001177,e71 016127-7641e 132(03146010,074804) 35.19.90 - - - 35,23769 4.3 Government Cul FM-phage 3 719.92 1.370601 00,003,244 31665.193 30.352631 - 117.326121 Wastewater 4.4 No.Dade 72 Inch PCC?FM 470450lta037 1.418,19 162184 3167.132 11,11192 4,91,538 23.764.116 Colknbn and 4.5 93405 Dade 5414417477 FM 5153510307 4093,205 151.492 5,004815 30,590039 1.736,650 18.570.705 744nsm663 4.6 %p648m4017671ant Canal AMI Croslr33M106%370 Acre .. 46,434 3,030 610,749 67.29 - 72703 lines 4.7 3epl01m7010518140107534144464511.10 240,614 15379 2,11).)18 1,041222 - 2323.331 48 3,04030,905 of 54 Inch PCCPFM In Me 017 1769151 656,196 74,19 5,116,016 4,895,902 - 10342,113 40 3e910340a90131181730 miles of AC 0MT0437193107Smarm 2531,777 855513 20,034 15.559,048 36,413,767 16941093 303,016 52.795893 4.10 101.0401,p380 0'PCCP face 3113808310e5850 1,263,322 306376 2512964 14.617.293 4.959467 - _ 1386192 423,707103 5.1 074,144 01 77520418 1,314,411 203,042 2,79,443 3913,982 9.1931% 1430,333 23.017,339 5.2 Upgrade of 4910101 312,922 79.649 313521 2.128,345 2,399,543 773.617 6.032491 5.3 U34182e 018580691 312812 79,605 313,511 1.219.245 3.371543 773,29 6,97,492 5.4 0e424375n40551071040 3580314 82,090 15,93 220.424 715,79 447,1511,481.438 1494% 5.5 6epi411714315404ye2r and 3694611646I97of Wel 4113540425 750.156 63,718 250.817 1.182397 1539,640 61399 48(3.935 5.6 0e3122235953315001A494e7510416 81.90 15,903 330.431 715.79 42.252 - 1,431433 5.7 3e2131n884405311104411and 11640411303 a W0w4019543417 166,339 42,477 167311 1.188400 3126,478 412,88 3.203.999 5.8 ReplawmeMA Electric.]48.]MeM4o2,1l 35Wp0mlm?59103 249,542 53037 209,034 149496 2533331 515,804 4,000.992 Sewn Pump 59 8epa10mt nn7PWmb4a 44nd 81741/641 Equipment 95001 293.70 0.771 675,966 2,39023 2371571 - 4.543572 Statim 9ystms 5.10 upgrade 03 7510488 164.113 3169 40944 2431,539 90504 - 299877 5.11 190011x337 of 6060 iM 60m 377340 Or to 77540336 328.356 63.618 831.694 1863.073 2.03910 - 5325,743 5.11 6e70607,e310(3M0310e000540137 192.015 38.171 519016 1.717844 193.03 - 3,555,423 5.13 Re7ur0MFmer4mle Gene4001 ant Controls at RquOl0ump ltMMa5 195039 12758 2841744 - - - 3.054,102 5.14 Upma18417510.96.0492 1402502 724,833 - - . 1.127.39 5.15 Upgr2de of 751961.0101.0338,974097 - 413,901 3576923 1.94480 - - - 5835,671 5.36 0460447039891%,04320063%9 - - 29.264 2.331730 1103914 - - 330639 5.11 03310e of%1937,0351.0370.003 - - - 39.968 3191,323 1893,051 - -. 5.371,302 5.18 Upgrade of 9104440491.910.097,0452.1236 • - 533,341 4,033,065 2.379.409 4.502.751 519 50470370617703442 - 3,957,05 4,083619 1.962827 - - - 10,93,462 105.583.%3 10pnne I I 461813631 36.363,3531 48.407,817 I 142933991 2429136101 131,61019 1 181708,071 203523033 I 342.349,635( 101.733833 r 64983.372 1 56831195 I 51.358896 i 37.173.3951 2552319 1 1550.630.320 Page 821 of 1707 Case 1:12-cv-24400-FAM Document 25-10 Entered on FLSD Docket 06/06/2013 Page 1 of 5 Appendix E Supplemental Environmental Project Plan This Appendix E describes the Supplemental Environmental Project("SEP") to be performed and funded by Miami-Dade as required by the Consent Decree. Miami-Dade shall install at least seven thousand six hundred sixty(7,660) linear feet of Gravity Sewer Mains within an industrial area which currently has no access to sanitary sewers and relies on septic systems. Disconnecting the industrial users from septic tanks and connecting them to the sewer system will improve water quality in the aquifer and nearby surface waters,and prevent future contamination. Miami-Dade County estimates that the SEP will cost two million forty seven thousand two hundred dollars ($2,047,200.00), and commits to spend at least this amount to complete the SEP.No part of this SEP expenditure shall include federal or state funds, including federal or state low interest loans, contracts, or grants. SEP Overview: Miami-Dade has indentified an area in the County which is zoned business,commercial, and industrial, from light to heavy manufacturing where there currently is no access to sewers, and where septic systems are inadequate or failing and many businesses pre-date the current septic system regulations. The area is bounded on the West by Northwest 37th Ave,on the North by State Road 112,on the East by Northwest 27th Ave,and on the South by North River Drive, which is parallel to the Miami River. The Melrose Neighborhood Revitalization Strategy Area is within these boundaries. The area is a low-income and high-poverty area. The attached map shows the project area,the sewer lines that are proposed to serve the area, and the higher risk (County permitted)businesses that will gain access to sewers as a result of this project. 1 Page 822 of 1707 Case 1:12-cv-24400-FAM Document 25-10 Entered on FLSD Docket 06/06/2013 Page 2 of 5 The SEP shall include the installation of at least seven thousand six hundred and sixty (7,660) linear feet of Gravity Sewer Mains within the area described above. The installation will also include public laterals up to the property line. Pursuant to existing regulations,businesses will have ninety(90) days to abandon their septic systems and connect to the public laterals. The priority of the connections will be based on proximity to the existing Gravity Sewer Mains. As the Gravity Sewer Mains which will be constructed through this SEP are being constructed as extensions from existing Gravity Sewer Mains,the businesses that are located closer to the existing Gravity Sewer Mains will be able to connect first, as the extended Gravity Sewer Mains near them are completed. The sequencing of construction will be determined as part of the design process based upon field conditions and construction efficiency. However, within those constraints, highest priority will be assigned to the western-most system which will serve the largest number of facilities which predate, and do not meet, current septic tank regulations,thence moving progressively to the eastern systems. It is estimated that the Gravity Sewer Mains will service a minimum of seventy-four(74) existing businesses. Miami-Dade estimates that an estimated flow of seventeen thousand six hundred(17,600)gallons per day of wastewater will be removed from the existing septic tanks and will be treated at one of Miami- Dade's WWTPs instead. Once Miami-Dade constructs the Gravity Sewer Mains,Miami-Dade will use existing authority to ensure that all developed lots in the affected area are connected to the new sewer extensions pursuant to sections 32-79, 32-80,and 24-43.1 (7)of the Code of Miami-Dade County. 2 Page 823 of 1707 Case 1:12-cv-24400-FAM Document 25-10 Entered on FLSD Docket 06/06/2013 Page 3 of 5 SEP Budget Miami-Dade estimates that it will cost two million forty seven thousand two hundred dollars ($2,047,200)to construct the proposed Gravity Sewer Mains. This amount includes the installation of gravity sewer lines and public laterals up to the property line, including project planning,design,permitting,procurement, construction cost, and construction management. The amount does not include the cost of installation of private laterals on the businesses' properties or the one-time connection fee, both of which are the private businesses' responsibility.Nor does it include the business' cost of abandoning the septic systems. Businesses which qualify for an exemption from water and sewer connection charges will be eligible to apply for a refund of connection charge. The exemption is available for commercial or industrial businesses which are located in a designated enterprise zone such as the targeted area, and which have a minimum of twenty-five percent(25%) of their employees residing in the enterprise zone, which has been identified as an environmental justice area. SEP funds shall not be used to pay connection charge refunds. Eligible SEP costs are: planning,design,permitting,procurement, construction cost for the gravity lines and public laterals,and construction management. Construction management shall be limited to less than ten percent(10%) of the total budget. SEP funds shall not be used for Miami-Dade administrative expenses. Project Processing: Miami-Dade will use a streamlined project approach to enhance implementation, while providing appropriate management oversight. The process shall include: 1. Miami-Dade will identify the facilities with the highest risk of causing contamination. 3 Page 824 of 1707 Case 1:12-cv-24400-FAM Document 25-10 Entered on FLSD Docket 06/06/2013 Page 4 of 5 2. The goal of the system design will be to maximize sewer system access to the highest risk properties within the area with the available funding. 3. The project will include: designing the lines,obtaining permits, installing the gravity lines and public laterals, inspecting the gravity lines and public laterals, and providing construction management. 4. The design milestone for this project shall be completed within thirty-six(36) months of the Date of Entry of the Consent Decree. Substantial completion of project construction shall be completed within sixty(60)months of the Date of Entry. 5. The SEP Completion Report will include information showing that Miami-Dade has finished construction of the Gravity Sewer Mains and is taking appropriate actions, including enforcement activity,to ensured that the businesses in the affected areas abandon their septic systems and connect to the sewer system. 4 Page 825 of 1707 ➢iw �. ',q-t, 4-El 6",mP r' All; II , r ia'�.1,1—....!,.,,,'..:, • •., -i 1 , .,:k0.41611.1",..-k— �I l � .. n 11"14'1-1°.1..7. �Wl,.�:.►�� �r r, �'..,,,,,..:....p: a 'y�q' 14 �i I r •n y'" 1 r � t ! V a}►V4�t➢ i tl f �,• � E ra"1" 't k ..,., v r, �---'�_�•^°�im' I 1 .•r ., - � t e w { :r t� ➢t M k�, x, �, Sti`•k ,7YT., 0 I �' T'.. 55•�r.- AL .N.x.tl'4 't1. • :., F, + I 1 1 ra W�y ar k 1 r )'4. I k SII It ,»a mrC wfagak+t"s a E_.7'••� z. :il° ,•# 4 crn••.m,-o, r t '�. u�. -0 t "-"k 4 r 1 v :, ,° . ., ,w,.aaa k+wb}.. K • t, r r r�l #.IY"trK,"r^ :: i'71 r I' i • 7 k k 4"::a.:'....4 s .r ,. •�n MI ,It M,.r= n „">y„:;• iA 3(r' ''' I ”' r:,t to N,:,r '�,J'1 r •a I e ,a. ° • ' ' ii ..rx �i Y 3, Yai` 't` '�a?r. t LL r Iri rte, • 1 =''aa������,�t{{�yt Description 1 •i '4° M e • l 4• • • • ,:Ciltl l r •tilt i bnrrA C fi ➢y?y a #r:`� pl R '-.'"I'''. ~M1.: tl f .r, ' ntr` i ylr"a� I it, or. Proposed Sewer Improvements ♦a wlr 1;;11.140 u '➢�.' . ". ., • �' m '� ..i44'..--'5'f.."'''''.- ki ;;�Mr9 d. L.;, ' �4 •• to serve ro properties with Industrial ak , )i, ' pll�' d iw I l a +tt P P •: , "' I •` . r �"��' ;�`a� w� . 4 + �y� 4;31Waste permits adjacent to impaired ! at ry 1 a —111 l'�I I F w t .e•rr, r water bodies. ._ A. '31f r ti Ren ; � MDWASD Service Area betty r� � tin K h l(N y,.,prwn,' `" r NW 37 Ave and NW 27 Ave I r li '� ".4'. r r u 1 4 ,-� , Inli ^^ `t• ,i t , ,_a) ' from State Road 112 to NW 26 q1 dL Ab 1 rY ,r_ � tI � .. `If I1 4 . 'f� C iri – c Street on the South and C 6 Miami t L! w :•.,°,� ' . ;tom ac r t x4 e t �`r1� ,l `' ,a ,- Canal on the Southwest. f a� r , t C ry e•:.r hrr"M1 1 1517�l tilll. t l , -.. i, t yyi Ltv �. r h•,,�. '1,''' ~�"pfi P��� iM i"� .;-;;',i-g:. I•.3 .7.k �ar �ILi...nt.^: er i" �y�}-,�'�" lr �''�l y ! •�: � t° ,' .�o .�Ip I�r'�la a..„t� ..1 y a1 ,v, lul+ . r" �°frL„,;Li�+, p ,'.!'•• `'.;";,-r;•.. ..1...--,rr -.. S4'j5'., w t 4;,r., •••311•-•t• 3.�• a I' ".Yl r �' t t n Gt '. 1 I rrk u: «iM- r 'w►:.. rl Y „__ _..1,.�..; �;L, . i t L4'41k+a•�rb''r1'°:,...."1". f W ti F311 Ott 'I y r a+„� r rl ,. • tI ` . Wt`"" '.I, ,,,,rtt 'a (• �, r• „-- Legend • ''.PuP r Ta ¢ n��. �ar.a'k e•a . t i t , t t E • ^: k•• `•' r y 4 )i 4 ;�,`,W ,I e ,• u py;:7'; Ti,,,,......;"� s o Industrial Waste(IW)Permits "ktio*,,, . ;!� I'1 • I i e t ��{ • '!➢E,y� O IW>500 GPD i i• •{ 40,• � • ___iii ra,' - - •,ri lr •I 1 ° ( an a.-._ L+ t J no,Y Et !`4"'K I t`3 n a 4• '3 _ ,3" / . -�• r y- r�' °i , ''t' r lc -L ti.r ,,,,,.."...,1, �'� ,. ,..5 ,L..a. • Existing Pump Station Ilr- / c"� .. '" .. { r u , 1'14'a*C.� ,1. • fir : I i 4�, • k • r i .+ Existing Farce Main ! !2' • . � s� t sY i4 s •I .gyp R, u II �t P ?,t i .4 +b r;14A 5k r 4.r 4 , -s1 r to rt ?,K ?,-,,-a: 'g3iIT M a P 4 .- f¢ 1IT,z —Existing Gravity Main '. �.* f't • '.•tw, , ;>.', ria1,P i ,- .4M{a L: I.,.... , r y . ,,`: ,,,1trgtgtirt"�'P"°.'' ary ,,,-.7rsa.„'• YL •:• ,,r” _....•,r, "°1., a �f.,r,.'•.: ;'.. _Proposed Priori G vi Main - '#I "• ,}ll?,:L? .r 1 •Qs 1?rl� "f 4 wK�,A „,....,,,,,,..,,•••• .. "`i� •`,r d +a.� i ;ji,Ly a . y .,••••,,,•1.4 $ .,'i�`.'; ➢ ,�.:� Priority Gravity a n 11 Il 0.....,?...... a,j ,.,• ,,,,4.,... tw•1na...31 1 *fp. il,I 14 `r s ,.2' y :2* TY r7' '' - Basin es I y 44041),x, s4.4:,./1n�i,,�� ter t 1 II _a.11,7r!'..0.:. Ir'r■ , � k;F`y t' TY K x a ylEf< .. *•°. s g4or� t�, r s `- '''• i _• ; 1 .0.:.1•�•t 4;- .u,• ' r { ` ,-,kkS -- �, -”.•,,r,..• -BU-1-Neighborhood Business District �•a .4n. �, 9 ` d/ ti •_ I .- '�'" r's••• 4 ::.-.4..:r.• k�i �i;1'':l...Zr "t'� i7C Irl ! rY • R S'•' BU-1A-Limited Business District 11('x•r c T k �'ral't t +' * c a - i < - i,h i. �. rirul �,„. 7'` ;:,_, Ir')ri k `1 �M ,•1 -N-ling',fir}>� a a: F. BU-2-Special Business District dl Y ,r ,r,. r1 '+*r"qh' Fl•: • 1� 1',414 r�,N r ,q., u ,,.I, i ��i . J , 9 1 If'e i +I�v'�! If a �,�..:,��a II„e.L,tila�,r.a r. tit' - .; K:,1:c.,' I', ow "`”,..1'..N111 s:. 4',A. ,,, FVi,A16��'!. n rill..0 Ir^ I,,'Ii rr w- 7 i'''' Y " 1) y' BU-3-liberal Bu ° r v �''�+ a + I i.•^. Business District rvr.,, 4 ,, 1 -rq� - ''';,;$6.1':.":-!.:',4;.. i1+ y' ' !n 1 p;"yr �d r .➢l }�k �.T .7 1 �II f 1'Y,,., tt !j 9. i t ,( of a-ir,w: M r� •r,�, r tI _ -C-2-Liberal Commercial 1 tDG r4� a` ,t k i�4�y rkl �+ a. 7" "�`" r�9 .E I= -GU-Gwemment Use �t,e .. r \ '..,-,;4;.•.•:--, yti,, , 1� r5r ,a. r a ��'y t�'' a +a'- "5'�I h : -IU-t-Industrial-Hea Manufacturing Manufacturing ism T la,L' I a .'it. .:.. ..,'A yM , , 14 ', tut 9 " I yr 1 ,r!>K ,+ ^ ^ �,I ll ai n11y irk y pt A �, tr g • ,IU-2-Industrial Heavy Manufacturing DisVicl I'a L ',,!';.,',f;',..."::,'':.•:.,..\\ } a '� I .. " y }id, ,1.Y Ff}1FFf t'�s•r V.f,a r 'r'k'+ 1 i.aa `y 16.Mr j ,af' �: �u - ii.,A, r -,,,�' \ T4'," i) ' I fe L•Ntiia+ :- loon/ASK,. P a,R.`,,,.. C,. -Y .l� r •rkG• .!' a .... +tet �• • �� M1t � ���� r.� ''• �I.�.li�' y' ..a A „ r i! F ., a r t 1 t r r 11 r;i. _ :' w • 1 a' 0 265 530 1,060 Feet •�R�MI r" )'l lig 4r I Ij.,,•'5• 4 '-( ',". * FJ '! °ti r i ': ltitk�7t oPitt, r� 'r' 1, `y Teit,, 1 -,,, l k r r 1 r r k 1 t..{�`'I r. `•,',2-,44'1,14......1.:,,`".. d a ..a� • ,aw~'t*?, !}.. ., 'tn :"..',..../.'" w`...... rrrkl'`a,°.,r I ��Rµy�� Si, r �' '�Sr,.� PRAM WATER AND SEWER DEPARTMENT Page 826 of 17,§upplemental Envlromental Project C-6 Miami Canal-Sewer Improvements Date:11/01/2012 OVER 1,000 FLORIDA PUBLICATIONS MONITORED UNDERGROUND UTILITIES STATE 888-3554437•PINELLAS 727-441-4101 • FAX 727-441-4507 + FLORIDA NEWSLETTERS, INC. WATER TREATMENT PLANTS NEWSLETTER • www.flresearch.com •email: info@flresearch.com Week Ending: P.O.Box 3129•Clearwater,Florida 33767 May 23, 2013 MIAMI HERALD DAILY Y!AMI 526,300 Time to n thepiper Ma 19,2013 OUR OPINION:Overdue upgrades to sewer,water system costly but necessary When the subject of raw code ago to fix its leaky sewage $425 billion in bonds to help pay tion of the system for lack ofprop- sewage comes up,the system,but the effort only went as for its 12-yea;$12.6 billion plan to er funding. typical response is, far as the money lasted.So federal fix crumbling pipes and upgrade The county also liked to dip into well,ewl But the leaders and resi- regulators once again have three treatment plants. the water and sewer department's dents of Miami-Dade County can- clamped down. But bonds alone can't shoulder funds to fatten its general revenue not ignore this most basic of infra- From 2010 to 2012,charge the this costly,necessary burden.The take,making things worse.Mr.Gi- structure issues—how to deal feds,the county's sewage system commission also agreed to raise menez has promised not to let that with a decrepit sewage-treatment ruptured at least 65 times,spewing water and sewage rates from 5to 8 happen anymore,at least for now. system.The wake-up call came more than47milliongallonsofun- percentannuallyoverthenextfive The repair plan has run into typ- when the U.S.Justice Department treated sewage into waterways years,meaning a total increase of ical county bidding politics and an and the Environmental Protection and streets.Worst is the Central 33 percent.This could raise a environmental flap over the Vir- Agency sued the county last De- District Wastewater Plant on Vir- homeowners'quarterly bill to$180 ginia Key plant.The mayor reject- cember for violating the Clean ginia Key, whose four spills from about$135.In fact,Mayor Gi- ed county administrators'bid so- Water Act because of frequent dumped 19 million gallons of raw menez has proposed an 8-percent licitations for parts of the plan,or- sewage spills into Biscayne Bay sewage over the two years.Fix the increase in next year's budget,a dering a re-do.And last week a and other waterways. whole system or else face huge painful but needed hike. commission committee stalled the This was only the latest in a run-daily fines,the county was told. Miami-Dade residents have bond plan,saying that questions ning dispute between regulators lb their credit,both Mayor Car- long enjoyed some of the lowest remain unanswered.OK,but the and the county over the sad state losGimenezandthe County Corn- water bills in the country,a result commission and mayor need to of its three sewage treatment mission took the feds seriously. of political reluctance to raise settle these issues quickly.The plants and thousands of miles of For a proposed new consent de- rates,and thus also voters'ire.But county only has until June 24 to pipes.The county promised in a cree,the commission two weeks this self-serving expediency has sign the federal consent decree. consent decree more than a de-ago preliminarily approved selling now backfired,with the deteriora- Such machinations are routine with fat county contracts.At more. than$12 billion,this is a huge deal. It's imperative that the mayor and AADVERTISEMENT commissioners keep the bidding The City of Tallahassee,Florida has released the following Bids/RFP's for the week ending May 17,2013 process transparent and free of RFQ No: 0123-13-RM-2rr favoritism. • RFQ Name: Consulting Engineering Services for Water Resources Engineering Water and Waste The environmental group Bis- wd 7'29�a cayne Bay Watersavers has won a Due Date: June ZT,ZU13�4:30 PM For information regarding these and other City of Tallahassee Bids,all interested vendors may legal battle to demand that the contact the City of Tallahassee,Procurement Services at(850)891-8280 or through FRS TDD at county assess projected storm 711. AU City bids are now posted on the Internet at www,ta)gov.com.Bids in bold type are available for a small fee,loy contacting DemandStar at(800)7711-1712 or via the Internet at surge and sea rise before upgrad- www d$100,000. n�gTtilster con}.Bidders should note that the City has noBE Goals for all contracts,which the VirginiaKeyplant.They exceed 1 0 0000.�'or information regarding the City's MBE Policy you may contact the City's MBE Office at(850)891-8500.For City Fast Track bids,and on a bid-by-bid basis for Non-Fast Track rightly point to the damage Hurri- bids,Bidders are required to be Pre-Qualified by the Cit s Engineering Division for Roadway, inflicted in New York Building,Underground Utility or Landscape Connecticane Sandng yThe City maintains an ongoing process Y for guatityivg bidders and will a plicationsatany time.For p�jupaliifiicaatlion information go City,where 10 billion gallons of to the Cioweb site at htt vsd• accept at ,-891-8 3a/orE E-mail: d.E 1®telg v. complete an sewage inundated streets and Wa- the applicationty and senditto an area 5 2 4 orocurem•Davt are ov.,cm. TALLAHASSEE DEMOCRAT Cathy R.Davis terways.Of course,these threats ders have • LEON COUNTY • Manager for Procurement Services should be assessed. DAILY-82,200 . acted to the cSo risisle responsibly e— they owe that and more to taxpay- ers,who will ultimately bear the LEDGER brunt of the costly fix-up plan. NOTICE TO BIDDERS LAKELAND TAMPA BAY TIMES INVITATION TO BID DAILY-96,000 ST.PETERSBURG'CITY OF MADEIRA BEACH 300 MUNICIPAL DRIVE • T.B.WILLIAMS WTP FILTER VALVES AND UNE SLUDGE THICKENER DAILY-447,200' UADEIRA BEACH•Fl.33108 vas manatee,a - (722)391-9951 FAX(227)395-9361 May IT,2913 REQUEST FOR PROPOSALS FOR Ben NO.3169 COASTAL GROIN RESTORATION Sealed Bid secba ee wit be Pby th Maung j Manages C of Laketend d& 1140 East Parlor et FOR THE CITY OF MADEIRA BEACH,FLORIDA. 2013. Bids received Mbar NV specified thee and date ata no,oe�.rue sealed The City of M9delra Beach will accept sealed proposals for the purpose of bifid,ail be publicly opened and read aloud on the same date and thea in the office of the selecting qualified companies capable of assisting with the City In Coastal Groin Purchasing Manager for the foTowm9: Restoration at a variety allocations throughout the City of Madeira Beach.For Bid Documents mey be obtained by contacting:Mn.Susan Hayes at(407)4803928.on specifications and additional Information,please contact the City Manager's office or baton,.Tuesday-May 28,2003. BId Documents should be obtained prior to the at crodder madelrabeaehfl.gOv. Pre-BId Meeting and are Required for Bld Submittal.Any Bidder that Does Not Have a City of Lakeland Bidder Number Should Visit the Above Websala and Complete a Bidder's Sealed proposals will be accepted until 10b0a.m local time,on Junn�e�6try,2013 at • Application. Madeira BeaCh Clty Hall,300 Municipal drive.Madeira seach,Fior(SFS3708In tete THE SERVICES OF A QUALIFIED,LICENSED AND EXPERIENCED CONTRACTOR TO office of the City Manager,at which time the sealed bids will be opened,publicly PROVIDE AU.REQUIRED ADMINISTRATION,MATERIALS,TOOLS,PERMITS.EQUIP• read,and available for review.Sealed envelopes should be clearly marked"Coastal MENTI LABOR AND SUPERVISION FOR FURNISHING ALL SERVICES FOR THE RE- Groin Restoration" PLACEMENT OF VALVES AND RATE OF FLOW CONTROLLERS AND SLUDGE THICK- ENER IMPROVEMENTS. THE VALVE AND RATE OF FLOW CONTROLLERS RE- The City reserves the right to reject any and all bids,waive any technical defects,, PLACEMENT INCLUDES THE REPLACEMENT OF FOUR 4 RATE OF FLOW CON- and to accept any bid,which in the opinion of the bidding authority,is in the best: TROVERS AND ACTUATORS REPLACEMENT11 OF TWO 2M3 PATE OF FLOW CON- Interest of the city.This request and all submissions are subject to City Ordinances. INCH BEUTTERFLV2VALV SAND ACN ORS,Sft'FPLACLAC EMENT OF ON NE 0j 24 INCH (3003963791) _ 5/22PM BUTTERFLY VALVES MD ACTUATORS.REPLACEMENT OF SIX(8)ACTUATORS FOR EXISTING 12-INCH BUTTERFLY VALVES. THE SLUDGE THICKENER IMPROVEMENTSIN COATING OF THDES THE E SLUDGE REPLACEMENT KEF ENER BASIN,THICKENER REPLACEMENTUOF THE SLUDGE ON CATEGORY IENGINEERINd•WATER PUMPS.THE BIDS SUBMITTED AND THE CONTRACT.IF AWARDED,SHALL BE IN LOCATION IHILLSBOROUGH COUNTY COMPLETE ACCORDANCE WITH,WITHOUT LIMITATION,THIS INVITATION TO BID AND THE PROJECT PLANS AND SPECIFICATIONS AS PREPARED BY TETRATY TECH, SPECS lura SYSTEM PROJECT STRATEGY ENTITLED,'CITY OF LAKELAND T.B.WILLIAMS WTP FILTER VALVES AND LIME SLUDGE THICKENER IMPROVEMENTS',ALL CODES,REQUIREMENTS,DRAWINGS CONSULTING SERVICES AND REGULATIONS REFERENCED THEREIN. Nati.Mandatory Pre-BId Mooting.The C of Lakeland has scheduled a Mandatory pre- DUE 16//262013 I I 2:30 PM I 525514 Bid Magid r and Site Visit on- ..... ne 4 2013 x110:00 a.m.,at me Luy in core- PRE-BID I i I i MANDATORY ❑ • • 0''n. , a • arena••• ,•- r•T a �: Parker Street.Lake- 6/512013 2:00 PM N Nolante Fbnda. BID# Nota:Only Those Ouellfiad Contractors m Attends nee shell be Eligible to Bid. 161062613 Not CONTACT 8131274-8351 Non-Mandatary Second SIM Visit on Tuesday-Juno 11.2013 at 9:00 am to 10:00 am. TAMPA,CITY OF Questions regarding thin invitation to Bid should be In writing and should reference the, PURCHASING DEPT above Bid number. Submit at questions to Mr.Danny Rodriguez,Purchasing Agent,vin age 827 0 1707 300E JACKSON ST • a-mes at purehBWrelandgae.not or fax(86291334-6777. TAMPA FL 33602 • FLORIDA NEWSLETTERS, INC. - 1-888-355-2437 Water, sewer u de approved p� pp TA A consent decree to fix the county's aging can't afford it,he argued. Commissioners also gave water and sewer pipes will mandate$1.6 billion In "We suffer from an appe- preliminary approval Tues- upgrades over the next 15 years. tite for caviar and a pocket- day to issuing$4.2 billion in • book for picadillo,"Souto bonds to finance the first BY PATRICIA PIAZZE! lion over five years from said,referring to the tradi- phase of the improvements. pmanei@MiamiHerafd.cem general-obligation bond tional Cuban ground-beef The county has about$160 Miami-Dade commis- funds to install sewers in an dish. million in bond money al- sioners swallowed hard industrial and commercial But his colleagues,while ready available for sewer up- medicine Tuesday,approv- area north of the Miami Riv- asking Gimenez's adminis- grades. ing an agreement with the er to reduce water pollution, tration to come up with al- The board's finanee corn- federal and state govern- a one-time$978,100 civil ternatives to the rate hikes, mitteehaddelayedavoteon ments to settle violations of fine and$825,000 to hire an said the repairs must move the bonds last week,saying environmental laws and outside monitor to oversee forward it wanted mom information. committing$L6 billion over the decree's implementa- "It's not easy—no one Sosa sponsored a special the next 15 years to fix the don. likes it—but we have to be meeting last Thursday at county's antiquated water The county has been ne- serious about our job," which county staff ex- and sewer pipes. gotiating the agreement Chairwoman Rebeca Sosa plained the details of the "Any world-class city has with the U.S.Department of said federal mandate. good infrastructure,and the Justice,U.S.Environmental The administration proj- The consent decree only most important infrastruc- Protection Agency and the ects that quarterly water covers sewageprojects,John tare in any city is its water Florida Department of Envi- bills,which have long been Renfrow, director of the and sewer,"Mayor Carlos ronmental Protection since among the lowest in the na- county's water and sewer Gimenez told the board. February 2012.Without it, don,will rise about 33 per- department,told commis- "Without water,we can't the federal and state govern- cent over the next five years, sioners.Miami-Dade needs - . live.Without getting rid of ments could impose steeper to$135 from$135 for typical at least$11 billion more in wastewater;then we're sus- penalties on Miami-Dade. residents.Gimenezplans to other improvements, he ceptlble to disease." The agencies must now propose an initial 8 percent added. The agreement,called a approve the agreement and hike in next year's budget, The Biscayne Bay Water- consent decree,will force send it to a federal judge in with additional increases keeper,an activist group fo- the county to upgrade its Miami,who must also OK it. over the next four years. cased on keeping the bay leaky sewage system follow- Commissioners signed None of the commission- waters clean,had asked to ingviolationsoflawssuchas off on the agreement by a ers who spoke were pleased weigh in on the decree at the federal Clean Water Act 121 vote.Commissioner Ja- with the looming increase Tuesday's meeting.But no In addition to the$1.6 bil- vier Souto was the lone dis- for next year,but Commis- public hearing was sched- lion in repairs,the county senter,saying he could not sioner Lynda Bell called for uled,and Sosa,citing the will have to incur other ex- support likely water-rate perspective,saying the hike group's involvement in the penses,including$15million hikes over thenextfewyears would be"cheaper than a federal government's law- to cover maintenance and to finance some of the re- Starbucks cup of coffee per suit against the county that management costs,$2 mil- pairs.Miami-Dade residents month" resulted in.the decree,de- clined to let the activists speak The group wants CATEGORY'MARINE CONSTRUCTION Miami - CATEGORY Dade to take sea-level rise LOCATION (PALM BEACH COUNTY I PALM BEACH POST and count surge into ac- SPECS HERBERT HOOVER DIKE REHABILITATION ( pipe sy- , STRUCTURE REPLACEMENTS,8-273&5-275 I WEST PALM BEACH tem. DUE i 5/220.013 II 12:00 PM I 525204 DAILY-245,000 In other business Tues- day,commissioners reap- PRE-BID ( (I I MANDATORY E TOWN OYPALM 4rA01Advertisement pointed the seven-member BID# I I RFQNo.2013-v Financial Recovery Board Request for contractor Qualifications CONTACT 'KEVIN CHARRIER 22517540267 • PUMP SWOON CTURAL AND�SCELLANEOUS that oversees the Jackson CAJUN CONTRACTORS,INC STRProposal,will he resolved for Pm. Health System. Qualification of Contractors for Pump The board will revert to PO BOX 104 Mallon And Miscellaneous Structural BATON ROUGE LA 370821 Phe bytheOffice of Town of t its old name, the Public sing Agent NOTES !EMAIL:ESTIMA11NG1IC4JUNUSA.COM -1 951okeedwbeeRoad,Suitt o,West Health Trust, beginning Palm Meech,Florida 33401,mrt112,00 June 1.Current members RM.on June 13.2913 The Town of Palm Beeth Is soliciting were reappointed to stag- Requests for oudlfcaOaU(970)for red terms except for Mi- CATEGORY[INVASIVE PLANTS of Pu• mp cordon a afcr construction Miscellanea. age St Pump sPr Projects..rd work areaow ami attorney Stephen Nuell, RnscturelFroJects.Tbe work cemtsts LOCATION IBROWARDCOUNTY I oo „alengail lls to a ori equipment who resigned earlier Tues- and SPECS EXOTIC PLANT REMOVAL • capedty or completely renovate and, day over accusations that he or tapioca sanitary sewer lift nations violated ethics rules. DUE 1 52912013 I( 2:00 PM ( 625213 • ,�;thin loam mations Tuesday's meeting was PRE-BID I Ii I MANDATORYPE Time Is of the essence and any not held in the commission BIDS I7313.137F I proposal received alter 2:00 pm.on chambers at County Hall, June 19,2013,whether by mal or CONTACT 9541344.1100 othawh..wtoms. benedu.,own.d, Instead,it took place at (CORAL SPRINGS,CITY OF Proposers are responsible for anteing the South Miami-Dade Cul- PURCHASING DEPT that their proposal in received In the Purchafh,g office by the deadline tural Arts Center in Cutler 19551 WEST SAMPLE RD Indicated 'CORAL SPRINGS FL 33065 I An original and da(a)copies of the Bay as part of Sosa's effort to proposed((tall be submitted In sealed bring the meetings closer to envelopes/packages addressed to Adie Pednta,Asn.Purchasing Agent, residents.Some 286 people Town of Palm leach,florid.,and CATEGORY IINVASIVEPLANIS I attended the meeting,ac- cording to venue operators, LOCATION,IBROWARD COUNTY I Pralerttt.Pon ropose,,mmey Miscellaneous tural the but the vast majority 1 rity were SPECS EXOTIC REMOVAL SITE CLEARING&FENCE webs N.at sswvrttawnolpabnbeach. county staff-The cost to INSTALLATION PARCEL 12 W Nd Request n r click hold the meeting off-site,So- DUE j 5130/2013 Ij 2:00 PM I 525530 and follow the Instructtom), For Sa'S office Said $J5000. further Information.contact the PRE-BID 1 11 I MANDATORY ] Purchasing Office.951 Okeechobee MIAMI HERALD Road,Suit.0,West Palm Bead,. • BID# 1532.11232 _ I amide 33401.Telephone(951)838- MIAMI '9541826-5140 Ad�Pedro.. DAILY-526,300 CONTACT IFT LAUDERDALE,cmoF Asst.Purchasing Agent PUB:The Palm Beast Pest May 22 2013 • .fPUBLIC SERVICE DEPT 5.19,5.2612013 481339 Y s CRY HALL 100 N ANDREWS AVE.4TH FL IFT LAUDERDALE FL 33301 I Page 828 of 1707