Amendment NO.48 Agreement between FENTRESS ARCHITECTS and CMB 2.019 _ Z8-s-38 DocuSign Envelope ID:264E834B-7CBA-4C62-976E-ABB3BOD8BOC6 } AMENDMENT NO.48 TO THE AGREEMENT BETWEEN THE CITY OF MIAMI BEACH,FLORIDA AND FENTRESS ARCHITECTS, DATED MAY 14,2014, FOR DESIGN CRITERIA PROFESSIONAL SERVICES FOR THE MIAMI BEACH CONVENTION CENTER RENOVATION PROJECT, IN THE AMOUNT OF$114.504 This Amendment No.46 to the greement made and entered this"'}L day of d dab*.r,2020, by and between the CITY OF MIAMI BEACH, a�municipal corporation existing under the laws of the State of Florida (hereinafter referred to as City),having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 33139,and FENTRESS ARCHITECTS, a Colorado corporation, having its offices at 421 Broadway, Denver, Colorado (hereinafter referred to as"Consultant"or"Architect-Engineer"). RECITALS WHEREAS,pursuant to Request for Qualifications(RFQ)No.2014-142ME,the Mayor and City Commission adopted Resolution No.2014-28538 on April 9,2014,approving and authorizing the Mayor and City Clerk to execute an Agreement with Fentress Architects for Design Criteria Professional Services for the Miami Beach Convention Center Renovation Project(the"Agreement");and WHEREAS, the Agreement was executed for a lump sum amount of$10,967,200 including reimbursable expenses;and WHEREAS, on December 8, 2014, Amendment No. 1 was executed for correction to Task 3 — Design Development and Design Criteria Package Services,requiring 30%completion level for low voltage systems in lieu of 90%completion;and WHEREAS, on December 8, 2014, Amendment No. 2 was executed for supplemental civil engineering services in the amount of$41,079;and WHEREAS, on December 8, 2014, Amendment No. 3 was executed for additional services to revise the quantity, sizes and configuratio s of the main ballroom, junior ballrooms, and meeting rooms, in the amount of $179,982;and WHEREAS,on January?1, 2015,Amendment No.4 was executed for a regional stormwater pump station location analysis,and for the development of a 3D animation and custom website for the Project in the amount of $76,605;and WHEREAS,on February 11,2015,the City Commission authorized Resolution No.2015-28925,authorizing an additional lump sum amount of$14,469,500, for the purpose of retaining Fentress to complete all design and construction administration servis for the Project;and WHEREAS,on March 31,2015,Amendment No.5 was executed for the completion of design development documents and preparation of Bid Package 1,in the amount of$2,442,400(part of Resolution No.2015-28925);and WHEREAS,on May 28,2015,Amendment No.6 was executed for a deductive adjustment to the Agreement in the total amount of$3,129,259,to delete the remaining Tasks 4, 5 and 6 of the Scope of Services set forth in Schedule A of the Agreement, as such tasks are no longer applicable and shall be superseded by a subsequent amendment with regard to the construction documentation and administration services required for the Project(part of Resolution No.2015-28925);a d WHEREAS, on May 28, 2015, Amendment No. 7 was executed for Additional Services relating to wind loading and micro-climate services,in the amount of$117,200; WHEREAS, on May 28, 2015, Amendment No. 8 was executed to retain Fentress Architects to serve as Architect of Record for the Projekt, to clarify requirements with regard to Design Development, and to provide for completion of Construction Documents and all construction administration services required of the Architect-Engineer for the Project,in the total amount of$15,156,359(part of Resolution No.2015-28925);and 1 DocuSign Envelope ID:264E834B-7CBA-4C62-976E-ABB3BOD8BOC6 WHEREAS, on August 14, 2015, Amendment No. 9 was executed for the provision of Commissioning Services,in the total amount of$302,878;and WHEREAS, on October 27, 2015, Amendment No. 10 was executed for a parapet design analysis and consultation services to reduce the applicable wind pressures on the curtain wall for potential construction cost reductions, in the amount of$15,000;and WHEREAS, on December 4, 2015, Amendment No. 11 was executed for the preparation of event plans background drawings to be used by event planners during construction,in the amount of$36,875;and WHEREAS, on March 29, 2018,Amendment No. 12 was executed for stormwater design revisions related to Public Works Department's pump stations design,in the amount of$34,073;and WHEREAS, on May 31, 2016, Amendment No. 13 was executed for design changes associated with the removal of the smoke control system, in the amount of$173,790;and WHEREAS,on June 19,2016,Amendment No.14 was executed for additional site visits by members of the design team for a weekly presence through July 28,2016,and for the implementation of alternative designs requested by the Construction Manager,in the amount of$148,999;and WHEREAS,on July 1812016,Amendment No, 15 was executed for design changes associated with raising 18th Street, 199 Street and Convention Center Drive, requested by Public Works to allow the raising of Meridian Avenue and 17th Street in the future,in the amount of$111,338;and WHEREAS,on August 26, 2016 Amendment No. 16 was executed for the addition of a 72"storm culvert to serve as a temporary bypass until the new culvert on 170 Street is completed by Public Works;and for the redesign of Convention Center Drive betiyeen 17"and 180 Streets due to the postponement of the Convention Center Hotel Project,in the amount of$70,270;and WHEREAS,on September 7,2016,Amendment No. 17 was executed for GMP cost reconciliation services beyond what was originally contemplated in the basic construction administration services,in the amount of$49,360; and WHEREAS,on September 7, 2016,Amendment No. 18 was executed for additional site visits by members of the design team for a weekly Presence through approximately September 30, 2016,and for the implementation of alternative designs requested by the Construction Manager,in the amount of$112,649;and WHEREAS, on October 24, 2016, Amendment No. 19 was executed for design changes associated with retaining the east half of the exiting exhibit hall bridge to provide more flexibility in egress travel distances of show layouts, in the amount of 220,291;and WHEREAS, on November 16, 2016, Amendment No. 20 was executed for additional reviews of steel submittals and for revisions of levels two and five truss loading for temporary conditions for Art Basel 2016; this Amendment is to be funded fronh a deductive change order to the Agreement with Clark Construction,in the amount of$96,710;and WHEREAS, on December 20, 2016, Amendment No. 21 was executed for additional design services associated with the incorporation of additional security cameras, revisions to vaults requested by FPL, additional structural engineering resulting from unforeseen site conditions (RFIs), construction details for the temporary transition slab required for Art Basel 2016, and renovation of the east kitchen not included in the original scope of work,in the amount of$80,330;and WHEREAS, on Decem er 20, 2016, Amendment No. 22 was executed for revisions to the construction documents as needed for artworC installations by Sarah Moris,Franz Ackermann and Ellen Harvey,selected as part of the Art in Public Places Program,in the amount of$17,121;and WHEREAS,on Decem4r 20,2016,Amendment No. 23 was executed for additional structural engineering services due to non-conformances by Clark Construction,in the amount of$10,000;and WHEREAS, on January 18, 2017, Amendment No. 24 was executed for additional design, permitting and construction administration services related to a new sanitary sewer lateral for the Carl Fisher Clubhouse, In the amount of$18,625;and 2 DocuSign Envelope ID:264E834B-7CBA-4C62-976E-ABB3BOD8BOC6 WHEREAS,on May 5,2017,Amendment No.25 was executed for revisions to the signage package,in the amount of$12,030;and WHEREAS,on May 5,2017,Amendment No.26 was executed for additional reviews of structural submittals and for design revisions associated with non-conforming field conditions, funded from a deductive change order to the Agreement with Clark Construction,in the amount of$15,580;and WHEREAS, on May 5, 2017, Amendment No. 27 was executed for design services to incorporate a new vertical circulation connection between the north side of the Exhibit Hall D and the Grand Ballroom on Level 2,in the amount of 124,240,as approved by the City Commission on April 26,2017(Agenda Item R71');and WHEREAS,on June 30,2017,Amendment No.28 was executed for design revisions associated with the relocation of the 19th Street pump station,in the amount of$2,585;and WHEREAS, on August 15, 2017, Amendment No. 29 was executed for design solutions for contractor- requested items related to closing non-conforming conditions related to RFI 3251, and for additional reviews of structural submittals,funded from a deductive change order to the Agreement with Clark Construction,in the amount of$30,875;and WHEREAS,on August 18, 2017, Amendment No. 30 was executed for additional services associated with revisions to the P-Lot Park design,as approved by the City Commission on July 26,2017,in the amount of 349,076; and WHEREAS, on September 18, 2017, Amendment No. 31 was executed for revisions to the construction documents as needed for artwork installations by Joseph Kosuth,selected as part of the Art in Public Places Program. in the amount of$14,570;and WHEREAS, on Septerr'ber 18, 2017, Amendment No. 32 was executed for revisions to the construction documents approved in Amend'nent No. 27, to accommodate the construction that progressed during the delayed issuance of the package due to extended negotiations with Art Basel,in the amount of$11,430;and WHEREAS, on September 19, 2017, Amendment No. 33 was executed for drainage revisions associated with keeping the existing culvert that crosses the P-Lot in lieu of removal,as requested by Public Works,due to the postponement of the 17"Street drainage improvements,in the amount of$11,985,and for revisions to the southwest corner rendering in the amount of$1,350;and WHEREAS, on December 15, 2015, Amendment No.34 was executed for additional reviews of structural submittals,and for design solutions for contractor-requested items related to closing non-conforming conditions,in the amount of$50,785,to be turjded from a deductive change order to the Agreement with Clark Construction;and WHEREAS,on December 15,2017,Amendment No.35 was executed for design revisions to the 219 Street Park as a result of the pump station installation and changes required for AIPP installations in the amount of$43,788, and for design solutions for the repair to the existing culvert which collapsed during installation of the new culvert,In the amount of$4,840;and WHEREAS,August 6,2018,Amendment No.36 was executed for 19th Street revisions as a result of pump station relocation,and additional construction administration services through November 30,2018.in the amount of $136,408;and WHEREAS, on September 21. 2018,Amendment No. 37 was executed for design revisions to 21g Street Park associated with retaining existing mahoganies and de-scoping sitework around Carl Fisher Clubhouse and Pump Station;reconciliation of relocated trees and associated design revisions to 21,1 Park;and 19th Street revisions as a result of the Holocaust M morial's request to keep the existing stone cladded knee wall; in the amount of $50,320;and WHEREAS,on September 25,2018,Amendment No.38 was executed for the development of a stand-alone package for the P-Lot Park for a separate permit,structural footing design for events tent structures,and additional services for re-bidding and construction administration of the park,in the amount of$261,445;and WHEREAS, on January 9, 2019 Amendment No. 39 was executed for the analysis, design and documentation to reinforce the existing structure to withstand additional cooling tower loads (NCR 3363 and RFI 3691), an updated site plan rendering, and extended construction administration services for the building, in the 3 DocuSign Envelope ID:264E834B-7CBA-4C62-976E-ABB3BOD8BOC6 amount of$206,510;and WHEREAS,on February 28,2019,Amendment No.40 was executed for additional design services required to redesign the routing of the F+orida Power and Light(FP&L)ductbank for P-Lot Park,in the amount of$5,328;and WHEREAS,on February 28,2019,Amendment No.41 was executed for additional design services related to revised pavement striping as 18th Street as requested by Transportation Department, and electrical revisions at 21'2Street Park,in the amountlof$7,125;and WHEREAS,on March 29,2019,Amendment No.42 was executed for extended Construction Administration Services through August 31,2019,in the amount of$263,250;and WHEREAS, on May 22, 2019, Amendment No. 43 was executed for the incorporation of Requests for Information(RFI's)Into the contract documents,required for permit revision,in the amount of$45,180;and WHEREAS, on September 10, 2019, Amendment No. 44 was executed for extended Construction Administration Services through January 31,2020,in the amount of 120,450;and WHEREAS, on January 13, 2020, Amendment No. 45 was executed for letters from Structural Engineer required for Special Events Permits through Antique Show of January 2020, additional services for Life Safety Consultant related to fire alarm changes,evaluation of electrical equipment in room 1.29.35 due to water leak,and additional services for Structural Engineer for review of conduit installation in the fifth floor topping slab;and WHEREAS,on March 23,2020,Amendment No.46 was executed for additional construction administration services for the building through June 30, 2020, additional forty(40) letters from Structural Engineer required for Special Events Permits through(July 2020,structural engineer evaluation of damage to an escalator support column caused during load-in/load-out oIf a show requested by the Building Official;and WHEREAS,on March 31,2020,Amendment No.47 was executed for additional construction administration services for P-Lot Park. WHEREAS, this Amendment No. 48 is for additional construction administration services for P-Lot Park through December 2020,additional services related to the design. NOW, THEREFORE, 4he parties hereto, and in consideration of the mutual promises, covenants, agreements, terms, and conditions herein contained, and other good and valuable consideration, the respect and adequacy are hereby acknowledged,do agree as follows: 1. ABOVE RECITALS. The above recitals are true and correct and are incorporated as a part of this Amendment No.48. 2. MODIFICATIONS. The Agreement is amended as provided in Appendix"A-48",attached herein. 3. OTHER PROVISIONS. All other provisions of the Agreement,as amended,are unchanged and in full force and effect. 4. RATIFICATION. The City and Consultant ratify the terms of the Agreement,as amended by this Amendment No.48. 4 DocuSign Envelope ID:264E834B-7CBA-4C62-9'6E-ABB3BOD8BOC6 IN WITNESS WHEREOF,the parties hereto have caused this Amendment No.48 to be executed in their names by their duly authorized officials as of the date first set forth above. DOC SU ST: DGIr VnORMIAMI BEACH CrArad arAut.A,�.b Jima &watts 10/28/2020 I 2:11 PM ED 2 Toa 2aa,R�p�nado 9rr�i��9`L.fiibrales City Clerk City Manager ATTEST: ** '' CONSULTANT: !0'++�DV"` C ignature: Signature J J ncpe1 nSlon i u�i Ntriii icciior C1st*}• 1en1IPss.President jCWO ot Name/Title Print Name/Title APPROVED AS TO FORM&LANGUAGE &FOR EXECUTION tlt afte Date 5 DocuSign Envelope ID:264E834B-7CBA-4062-976E-ABB3BOD8BOC6 Appendix"A-48 1. SCOPE OF SERVICES a. P-Lot Park Construction Administration Services: Refer to attached proposal dated August 10,2020. b. P-Lot Park Exercise Equipment Area:Refer to attached proposal dated September 8,2020. c. Door Brace Engineering: Refer to attached proposal dated October 6,2020. d. Life Safety Evaluation Report:Refer to attached proposal dated October 1,2020. e. Credit for unused reimbursables/expenses allowances in Amendments 30 and 38. 2. PAYMENT AND COMPENSATION a. P-Lot Park CA Services: West 8: $37,695(5,385 monthly lump sum) Fentress: $19.600,(hourly,not-to-exceed) Total: $57,295 b. P-Lot Park Exercise Equipment Area: West 8: $17,900(lump sum percentage of completion) Fentress: $"6.750(lump sum percentage of completion) Total: $24,650 c. Life Safety Evaluation Report: Fentress: $ 1,250(lump sum percentage of completion) Jensen Hughes: Initial Stakeholder Engagement: $ 1,500 Document Collection and Review: $ 9,500 Life Safety Evaluation: $28.500 Total Jensen Hughes: $39,500 Total Life Safety Report: $40,750 d. Door Brace Engineering: $ 4,500(lump sum percentage of completion) e. Credit for Reimbursables/Expenses: Amendment 30: -$11,541 Amendment 38: -$ 1,150 Total Credit: -$12,691 TOTAL AMENDMENT 48: $114,504 6 DocuSign Envelope ID:264E834B-7CBA-4C62-946E-ABB3BOD8BOC6 Project Contingency Added Total Scope Original Agreement $10,967,200 $1,096,720 $12,063,920 Amendment•Reso 2015-28925 (5,6&8) Amendment S _ $ 2,442,400 .$ 2,442,400. Amendment 6 $ (3,129,259) ' _$ (3,129,259) 1 Amendment 8 $15,156,359 I $15,156,359 Contingency reduction $ (96 720); $ (96,720) Total $25,436,700 $1,000,000 - $26,436,700 Amendment 2-Civil $ 41,079 1 Amendment 3-Ballrm change 5 179,982 Amendment 4-Stormwater/website $ 76,605 Amendment 7•Wind study/roof survey $ 117,200 I Amendment 9-Commissioning $ 302,876 Amendment 10-Parapet Analysis $ 15,000 i Amendment 11-Event Plans $ 36,875 Amendment 12•Stormwater Revisions $ 34,073 Amendment 13-Smoke Control Removal $ 173,790; Amendment 14-Site Visits&Alternative Desi $ • $ 148,999 Amendment 15-Streets Regrading $ 22,520 I$ 88,818 Amendment 16-Culvert and Cony Ctr Dr redesign $ 70,270 Amendment 17•GMP Reconciliation-add'I $ 49,360, Amendment 18-Additional Site Visits $ 112,649 Amendment 19•East Bridge Retention ;$ 220,291 Amendment 20-Steel submittals and Truss laacing analysis $ 96,710 Amendment 21-Cameras,vaults,RFIs,kitchen,t transition slab .5 80,330 Amendment 22-AIPP(Morris,Ackermann&Harvey) I $ 17,121, Amendment 23-NCRs' $ 10,000 Amendment 24-Sanitary Sewer Lateral-Carl F sher Clubhouse $ 18,625! _ Amendment 25-Signage Package Revisions $ 12,030 Amendment 26-Structural submittals&NCRs $ 15,580 Amendment 27•Exhibit hall/Ballroom Vertical Circulation $ 124,240 Amendment 28-19th Street Pump Station Relocation 5 2,585• Amendment 29•RFI 3251&Structural Submitta s 5 30,875 Amendment 30-P-Lot Park Revision $ 349,076; Amendment 31-AIPP(Joseph Kosuth) $ 14,570; Amendment 32-Exhibit Hall/Ballroom Vertical Circulation rev $ 11.430 Amendment 33-Plot culvert and rendering $ 13,335' Amendment 34-Structural Submittals&/NCRs $ 50,785 'Amendment 35-21st St Park Rev&Culvert repai{ $ 48,628: Amendment 36-19th St and CA Services $ 136,408 'Amendment 37-21st Park,Tree Reconc,19th St $ 50,320' Amendment 38•Plot Park Repackaging and CA services $ 261,445 I Amendment 39-Rendering,NCR 3363,Add.'CAi ervices Bldg $ 206,510 Amendment 40•Plot Park-FPL Ductbank $ 5,328, Amendment 41-18th St pavement marking and 21st elec $ 7,125 Amendment 42-Extended CA and RFls review $ 263,250 Amendment 43-Incorporation of RFIs into Contract Documents .. 45,180 _ Amendment 44-Extended CA $ 120,450 Amendment 45-Event letters,IS Consultant,Struct Eng,Electrical equipment eval, $ 44,325 Amendment 46-Extended CA,Event Letters,Structural Eng Eval damaged column $ 129,750 'Amendment 47•Extended CA for P•Lot Park(Pride Park) •$ 42,035 'Amendment 48-Plot Park CA,exercise equip&c1 edit for reimb;Bldg Life Safety Report;Door bracing S 114,504 Total $25,436,700 $1,000,000 ' $3,012,937 $29,449,637 1. Amendments 14,18,20.23,26,29 and 34 totaling$465,598,funded from Clark's contract via deductive change orders, 2. Amendments 22&31 totaling$31 691 funded from AIPP fund. . 7