Loading...
Resolution 2021-31583 RESOLUTION NO, 2021-31583 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, AUTHORIZING THE CITY ADMINISTRATION TO ALLOW RESIDENTS TO PLACE, AT THEIR OWN COST, GRASS BLOCK PAVERS IN FRONT.OF THEIR PROPERTY, TO ALLEVIATE FLOODING OF CERTAIN CITY RIGHT-OF-WAYS .IDENTIFIED BY THE .PUBLIC WORKS DEPARTMENT AS HAVING A LOW ELEVATION, AND AUTHORIZING THE INSTALLATION TO BE PERMITTED BY THE PUBLIC WORKS ENGINEERING DIVISION, IN ORDER TO ENSURE PROPER INSTALLATION AND THE ADMINISTRATION'S ABILITY TO OBSERVE THE RESULTS. f WHEREAS, the City of Miami Beach has many low-lying neighborhoods, built decades ago, where drainage to mitigate flooding had not yet been designed; and f . . WHEREAS, over past year, there have tbeen resident reports of flooding (tidal and stormwater) in front of their properties, and as such, residents have requested the City that they be allowed to apply a specialty surface treatment on their swale, in order to mitigate flooding and mud nuisance; and WHEREAS, swales have historically been limited to grass and trees to promote vegetation, and our current stormwater approach attempts to mimic natures' water cycle; and WHEREAS, such approach is important because- percolating water through sod encourages the replenishment of the freshwater lens; and WHEREAS, continuing this approach, at the May 6, 2020 meeting of the Land 'Use and Sustainability ("LUSC"), Public Works Department presented a blue/green infrastructure (bioswale) pilot program for .consideration,.to be setup in front of residences at the La Gorce Neighborhood, known to flood duringheavy rain; and WHEREAS, the LUSC members agreed with the pilot program and made a motion to have Public Works proceed with the proposed bioswale, and to bring the item to the full Commission for approval; and WHEREAS, however, following the LUSC motion, and prior to bringing the pilot program to the City Commission for approval, Public Works was advised by the residents that they did not want the City to proceed with the pilot program as it would not completely address their flooding concerns; and WHEREAS, the City strives to provide the _highest level of customer service, and is continuouslyworkingto address its residents' needs in the best possible way; and WHEREAS, to that end, the City Administration has developed an alternate strategy to alleviate flooding in areasof concern, which would entail the installation of grass block pavers, also known as grow-through pavers; and WHEREAS, these pavers, made of recycled plastic with open cells that allow grass to grow within them, and a porous, eco-friendly, option for driveways and parking areas, would be installed in the swale area to provide soil stabilization; and WHEREAS, the grass block pavers provide a durable grass surface that can support heavy vehicles, maintain permeable surface areas, and at the same time eliminate or reduce stormwater runoff; and WHEREAS, this system also provides a porous condition that allows rapid absorption and movement of stormwater and enhanced aesthetics, where the grass surface will blend with the surrounding natural surface of the swale; and WHEREAS, residents have demonstrated interest in the grass block pavers alternative that ought to, at a minimum, stabilize soils in their swale areas; and WHEREAS, this stabilization should reduce the nuisance of mud, even if flooding is not significantly reduced, and is expected to result in minor flooding benefits and some water quality benefits; and WHEREAS, the Administration recommends allowing residents to place grass pavers in front of their property, within the City's right-of-way, in such areas identified by Public Works as having a low elevation, to alleviate flooding; and WHEREAS, further, it is recommended that this grass block paver pilot program be paid for by property owners who have expressed interest in participating, limiting it to those single- family homes that cannot provide more than 1-2 parking spaces within the private lot, and for such installation to be permitted by the City's Engineering Division in order to ensure proper installation, and the Administration's ability to observe the results. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, hereby authorize the City Administration to allow residents to place, at their own cost, grass pavers in front of their property, to alleviate flooding of certain City Right-Of-Ways identified by the Public Works Department as having a low elevation, to alleviate flooding, and authorize the installation to be permitted by the Public Works Engineering Division, in order to ensure proper installation and the Administration's ability to observe the results. PASSED and ADOPTED this day of Fe6ruar� , 2021. Dan Gelber, Mayor ATTEST: • Rafael Gr nado Cit Cle ED AS TO FORM & LANGUAGE Lys' 'f'''', & FOR EXECUTION L °IMO,ORATED' '''6M`^'' City Attorney �, - Date Resolutions -C7 O MIAMI BEACH COMMISSION MEMORANDUM TO: Honorable Mayor and Members of the City Commission FROM: Raul J.Aguila, Interim City Manager DATE: February 10, 2021 SUBJECT:A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA,AUTHORIZING THE CITYADMINISTRATION TO ALLOW RESIDENTS TO PLACE, AT THEIR OWN COST, GRASS BLOCK PAVERS IN FRONT OF THEIR PROPERTY, TO ALLEVIATE FLOODING OF CERTAIN CITY RIGHT-OF-WAYS IDENTIFIED BY THE PUBLIC WORKS DEPARTMENT AS HAVING A LOW ELEVATION, AND AUTHORIZING THE INSTALLATION TO BE PERMITTED BY THE PUBLIC WORKS ENGINEERING DIVISION, IN ORDER TO ENSURE PROPER INSTALLATION AND THE ADMINISTRATION'S ABILITY TO OBSERVE THE RESULTS. RECOMMENDATION The Administration recommends allowing residents to place grass pavers in front of their property, within the City's right-of-way, in such areas identified by Public Works as having a low elevation, in order to alleviate flooding. Further, it is recommended that this grass paver pilot program be paid for by property owners who have expressed interest in participating, however, limit it to those single family homes that cannot provide more than 2 parking spaces within the private lot, and such installation be permitted by the City's Engineering Division in order to ensure proper installation, and to facilitate the Administration's ability to observe and document the results. BACKGROUND/HISTORY The City of Miami Beach has many low-lying neighborhoods, built decades ago,where drainage to mitigate flooding had not yet been designed. Over the past year, there have been resident reports of flooding (tidal and stormwater) in front of their properties. As such, residents have requested of the City that they be allowed to apply a specialty surface treatment on their swale in order to mitigate flooding and mud nuisance. Swales have historically been limited to grass and trees to promote vegetation. Additionally, our current stormwater approach attempts to mimic nature's water cycle. This is important because percolating water through sod encourages the replenishment of the freshwater lens. Continuing this approach, at the May 6, 2020 meeting of the Land Use and Sustainability Page 477 of 1252 Committee (LUSC), Public Works presented its members a blue/green infrastructure (bioswale) pilot program for consideration, to be setup in front of a residence at the La Gorce Neighborhood, known to flood during heavy rain. The Committee members were in agreement with the pilot program and made a motion to have Public Works proceed with the proposed bioswale, and to bring the item to the City Commission for approval. Following the LUSC motion, and prior to bringing the pilot program to the City Commission for approval, Public Works was advised by the residents they did not want to proceed with the pilot program, as it would not completely address their flooding concerns. A bioswale can present the following benefits and limitations as described below: BENEFITS LIMITATIONS Effective removal of suspended Bioswales are not intended to solve water solids, nutrients (nitrogen and quantity issues;thus,flooding would not be phosphorus)and other pollutants completely addressed by a bioswale. before it enters the bay. Allows stormwater infiltration to Periodic maintenance is required to replenish the freshwater lens beneath preserve vegetation, grading, and the ground permeability. Captures the first flush (1.5 inches)of Only the first 1.5 inches of large rain events runoff from every rain event to remove will be captured—excess water will bypass contaminants and attenuates the the bioswale due to limited capacity; intensity of rainfalls especially for high however, this adequately treats frequency, low volume rains. contaminated runoff per County and State regulations. Beautifies the area with attractive Potential loss of parking if bioswales are landscape and utilizes a variety of placed in right-of-way areas currently being native plants to minimize maintenance used by property owners for parking. requirements. Public Works staff evaluated a second residence in the North Bay Road neighborhood that is also known to flood. Following discussions with the property owners, they too opted out of the program. No other resident has expressed a desire to participate in a bioswale pilot program promoted by the City. ANALYSIS The City of Miami Beach strives to provide the highest level of customer service, and is continuously working to address its resident's needs in the best possible way. To that end, the City Administration has developed an alternate strategy to alleviate flooding in areas of concern, which would entail the installation of grass block pavers, also known as grow-through pavers. The grass block pavers provide a durable grass surface that can support heavy vehicles, maintain permeable surface areas, and at the same time eliminate or reduce stormwater runoff. This system also provides a porous condition that allows rapid absorption and movement of stormwater. Additionally, the grass block paver provides enhanced aesthetics, where the grass surface will blend with the surrounding natural surface of the swale. Page 478 of 1252 Residents have expressed an interest in the grass block paver alternative, that ought to at a minimum, stabilize soils in their swale areas. This stabilization should reduce the nuisance of mud, even if flooding is not significantly reduced. Additionally, minor flooding benefits and some water quality benefits are expected. SUPPORTING SURVEY DATA Results from the 2019 Resident Survey show that 50% of residents rated efforts to manage stormwater drainage and flooding as excellent/good, and 59% of residents rated stormwater and drainage improvements as excellent/good. In order to continue maintaining excellent standards in this area, the City is considering developing an alternate blue- green infrastructure pilot program as an initiative to alleviate flooding. CONCLUSION The Administration recommends allowing residents to place grass pavers in front of their property, within the City's right-of-way, in such areas identified by Public Works as having a low elevation, in order to alleviate flooding. Further, it is recommended that this grass paver pilot program be paid for by property owners who have expressed interest in participating, however, limit it to those single family homes that cannot provide more than 2 parking spaces within the private lot, and such installation be permitted by the City's Engineering Division in order to ensure proper installation, and to facilitate the Administration's ability to observe and document the results. Applicable Area South Beach Is this a "Residents Right Does this item utilize G.O. to Know" item, pursuant to Bond Funds? City Code Section 2-14? Yes No Legislative Tracking Public Works ATTACHMENTS: Description ❑ Permeable-Paver-Brochure o Resolution Page 479 of 1252 ., .f, .• ..• 41 ,,i. ` A • „ai, * 1W 10 440111111111.4 * • :..- millaglikrib%_ _ .. .3 1 1 Permeable Pavers We put water in its place High performance alternative to traditional paving . , • , , , , . ..... ....,,.., , , . , . . Ak °I,.!... ..,,,• ':...,,`4m,„ * W. 1, , . . .,'z,,,l‘ a Vi% •7.„,r;„.- ::: ' ;‘, kt ; ,,,,,--',t. . . . . t., . _ .11..„-, II& ,„),i,v,-, •,.‘,1_ .gt, .- '.--*EN vNk -• v.„---..4 ,•,,i- - - v.- - -, - 4L,...„.„ ‘._ . .. . . . . „...., -- . ,,.,. -,,.. ,• . -_ - • , . . . . ..1:,.....5-- 4-"I•"N '*Ig r 4-, . 4 ffitl, 4,14te, ,4•t.'„X-4„., ''''.'” • . . . . , . . . 44 , .. ,..'.,-.40,,•-iitti ,..::3,4r,A7:11,• ,,.A '_ P , , . .. f ,. "1, .!°.••:4,‘„act t * ro..•V/4 , - . . . '4%,_,•- , ... , - . •,-. ', ) 4, „,, tix• - - '4 • i , . - ,„ •11 IltIl- . e .. k 6. •, 4- i r ,.•. 0 . "- . _. , , . i _,,- . '- • ..-._.., -, • ' o; *'''-`.: '.1.4 ':"' '''' '''' _,,,,,- . ',4 , ° t : • ., , , , ,• • w! 1,,, ., ow' . .„" 1:17';':,:.Z, foit.!7`i k .. 'I* . . •-•lr% :01„ilf . '-.' :01..' '•'ll ' . -- - , • 1-Y, '4-!. - ."i• *••:,,,,, 1- ••" f-' •r. li ,'& .I...,,, „,, ,. .•,"7 , ''. '' • °A •.. , , . ..... .' - -- • -• • -,. • ..„ •---- . ,• . ,,•- 141 •*-•°, . Greatest GCom). - .. - - 0 - - i..-:,... . , , 4 ' '.---'St en • h EW , e 1144.JWC-- 4.1,71,:%1•4 ..„,..,. . ,t'ANICitt!, . . ' , ,' ittLItt84 4 `1,.... 4 ; t ,„ fftrack TM :Itt"t$ -.. ..•.,- Tu *46, 12*04 1 X4 . .k .....t"- . , ,i,,, 4..,...•:j .,,,. ... *4„,--it ..y.K„ A* • ., , . ..•••• 41, -,,- • ,,,,,,.,Ary. -,,,- Grass Paver ; 2,4‘,„, .. ..,„, „;•,,,,,- - • _ , AIV, ,.. -. Orlistrik ' , EZ Roll' ,444.4 irktiro•40-' *4. ri t• s ---- ' 44 , tiv"•!': °,7,3pellIr"Ift."4-ft V, 114t ter Grass Paver - --. 11gr,., .,..„s, ... ., ..-...,? •, .sit„ -..,_ f,--1-,,,, .114.-w- .1.."' ifikW.4;Prill%4111 1.1,,,,k,.. :47f,04,,4..3 4,:-.14,,,ttpt---gx.• -r• --zit.4,-1", , irt. 1.•-4,,-,.,..ktiit,„.A.31 - #4. ' 4 *P",•.0* 4 ,„r. 4 - • • 4;0* ' gelvz.,:ltk-1-ka, 4' -.qic.•-1*, 4',,:s *-"=%.,itioti.1444 1%•66- -rfay;* --zr -4 "'*,,t1":-0N*,.41141111-lesiq'il'br- itilla7v:14-Eirtic.',656"- -.,&10. .,dlt 4025-..'1?"4141 EZ Roll' ,. -.7:atl, ..., le cptw ..Attpwsit,Akilo Gravel Paver ,.. r 4.- 1. li- '1.-0,44-irt"- ids -,e,i, - ,,,•a„ ki, - ...rd‘ii,_ _ ti0„,1.vtit-il 14 t- It- " '44 le P alit *-•° e r4 "E _i•164...tott., 1`.; 4 4 t L ;444%11104 -.• itre; ,:4 it,..+1 : 41....1,9( .• .0t. ,, •,- - . _ , . ,. iorleinadmilid * ... , --- - ...*-- -.• MADE IN ndspro.com USA What are Permeable Pavers? NDS Permeable Pavers provide a high-performing { alternative to traditional paving methods. Creating a strong and durable grass or gravel surface that can support heavy vehicles, they maintain permeable surface areas, eliminating or reducing stormwater runoff. Benefits Stormwater Management. A sustainable solution that reduces impervious area, volume of runoff, and size of downstream BMPs. High Structural Strength. Offering a high load bearing capacity, NDS Permeable Pavers feature hexagonal cells that connect to form a flexible grid capable of handling significant structural loads. Enhanced Aesthetics. Grass or gravel surfaces blend with surrounding natural surface. Easy Installation.EZ Roll" Products come in large rolls that are easily placed and clipped together. Tuffttracr features an integrated easy assemble clip that greatly reduces installation time. Environmentally Friendly. NDS permeable pavers can help contribute to LEED credits and are made of recycled plastic. 2 : N DSa Visit ndspro.com/permeable-pavers '1 '-• 1 \I \\\.\\,s‘'''' ; ` . . , . Th-----,... H-- Tufftrack . - -.., ;..:-..t; 4.-:-Te -..... t• ,...: .A, , , Grass Paver —.-------- . I —- - • _ ....tr.....„ .. , . .., ..... ..... ....„. , • II. '••• .. .. Z" " _, 4111 r ""' -i..1'.1•-d4•114-4ti•tt-,•. . . . •Ar...0 46•11P4S-41-ti.b.,,.1; - ;t).ii.d• -,,'-...- ••4.t:. ,A, „, . s ••t•-,9 41 ',. --, • ,:•sci-e. • i*.Aii•tt'.;:, - • ii•*4 A .,.. .. . ,. . At:•ci.vs ,.,.- -,„ - lar_ct.''. ' 4.. ,.....,,,„ .. ti*...0.4.4,t:-a_....- - • ,/,, . A.4,--/- ,„."--• A / • re. 11. M. , ,..... ‘... -1.. ..44, !..- , - "” .. • .. .. itt A ,,' ,,_4'',.. ''./r4,-;--•,,f4,-1,,,,,-;.; ,—. -,:: , .... . . •.. - I . - lk-410'-i•trf - "kOZ,44 5;xf - -4, ,..., - /Ji -...„- - , EZ Roll" sonsok .' ' . . 4,•,,b,„4. ai,..,. •s,tilp,• *mitIOIL er 411i alp lkip lee eip _ • eke 41400k10%4141.. 1 , Grass Paver , „ e alp 0 •1.,..ej led led. elhe la - 4 • -4%ri I 1%71%ril 11' • $ 00<•<•<$.(0$COIC --- '' • • • 0A0.0 • OAP •We • iio% toiliA .1 I.% • • • • • _• y-.-••----77-3 • 10 • 11 • 1/0 • • 1 - "'-` - • _,--___ - ..;;•'.-- I - 1 • , A ... -.., :,' • ' ,.....11411,3# •r. .7- - t -... * • , -:',,A- - .-.- . ' Gravel Paver :1 ..r.1r:::::_:-.1:1-::_til:::::11:*-1. (• Or , •' . ' I . EZ Roll' 4 •11 I i al 4 •-,.— 'i) 3:1:: ifs 1' r: , ' 1 111111lMllr Ifr- . . . . - .. .... „ ". ,...•...1 .....L.• ,....- • •...-*Anii.:t 44 -,...„,•.-,;t ..,s;:oic,.c::::.i.!:,.. .Z;;.:;i0,-,.::,,\,r't,s4.-.7s, 4s,r7*.e.....s'a.*-,,k,4_!4 •4, :,r ei-4.. ":„„e?,Z s,.1.,1,21.-,--rs,,. :1;"..-4,1*-•,...( )4.,., ,. klyytt ,Kee, ,-4.141.4.1.1\74..114t % 7 ..."' y'1 .., - . . '. ,,. _ . ,,,-lA. " • !-' '5,r; •:`z :c`C:f•-::-',...__,,,Itc• .s.„ ;14, • t `'-iii . . •u •,_r....,._ ..., , ---.. 4•• '''''''"•!. 'S 0,'‘ - ' •• •••It ' , 1.i.- o:P.. .7.' '••'- -.';''._r41, ,,!_, •:_, 4', -f-,.•,_..,,dit,.6_,": ..10;,f•-..., ,$ 40..4.10‘14 - Xi: . . 44, 4 ' ' i-•- I 474 11 "' 44. ' digieLt:1 , VI-: :. --,-, r--. ,-.4 :.'16.a it i ' 4 ' "7,. ''' • T ' ' IrLI.. ."" . ' ? ,.,.7., "I:i.• •••-..**:',...!._`...Its,• 4.1,-?....wrii,...,tirt...:,..„ s- 4,„!. ..,,e, "N. . ik ' 41"'•. A-'.7,47,4.01 "-4':.: - -,s-;'wt.;.. ,,'"Z.- -'..4'``fr. '%, k 1. _ _,i.: ' ,' ''' • s'-' -4ii_• -664 --""-- ' C_,-446., *.... ,.. - ' * i''...'r.rNe--,r"1"----. 11 '.14 . 44 •;--',- 4%.:01.40•41••• .. .4S:',", ' • .zAk,-1•Alf".. al-- -,-•-,‘1.1 ' k• .. - , 1/41/4, 1/4, •''.•''' • 1 s t ' siii. - 141h, 1 for specs,detail drawings and case studies We put water in its place 3 i c Tufftrack' Grass Pavers i I 1 ! TufftrackTM Grass Pavers A turf reinforcement, load transferring paving system designed to be placed directly on a lightly compacted planting base which is installed over an engineer specified compacted road base. , It can also be used for light load applications without road base by simply compacting the planting base 1 per engineer specification.This system is designed to transfer vehicle weight directly to the '' supportive base course and prevent soil compaction.The web of interconnected honeycomb cells provides resistance from vehicular load as well as lateral containment that prevents the soil compaction that would inhibit healthy root growth. This system also provides a porous condition that allows rapid absorption and movement of stormwater.Tufftrack Grass Pavers can be infilled with soil per specification.Tufftrack Pavers have a compressive strength of 86,563 lbs. in an empty condition; 400,000 lbs. when filled with native top soil. The Tufftrack Grass Paver system has been used and accepted across the country for a wide variety of projects including emergency vehicle access purposes. • Add bond Informal n.dota'.s.and Spec`canons can be found at http://wAv.ndspro.com/perroeable-pavers/grass-Pavers/tufftrack-grass-pavers For f,,nher:ecfr nca;su000r,or ass,sta-,ee,contact:tocrlso.mceandspro.com '' 'n i ° ) ..44, . . . . . . ‘,, z.,,,,,,, ,..fr, _,. , ..!. z_., .. . i i , .., . . . . _ . . .. . .., , ,t :. � f „„.„, vilw,_ - mer;* 31, ----- ' . - " __.,J • • • , •-- e _ . _ �i as ""+► . e O Y y '',' .el,rs -.,3 ♦ • '. . . . . .' ' as •. e'e 4 . . • P 0 :.0 ;e :: ewe a . ��_.' a• _ . .•' '4..0. .4 ♦ . • 100. • 4 .fe se ♦ ,. . , - . . ' , Gs °� i e . . . - µ0 0 0 A r~ ¢ o v4 Nps' visit ndspro.com/permeable-pavers il i ..*:-.."..., 1 4071101, 1111111 .1 -. i Design Theory . I 0 g-t. Tufftrackr"'Grass Paver has unique Tongue and Groove clips 101111;44111.111111111111JS that minimize iha paver mat separailon and mako for qir lnstaitation ITZNi 4Ilk ' 1111 The Tufftrack'm Grass Paver's secure locking clips prevent paver displacement or matI �,failure that could result.from traffic load mov�:ment or clanging ground condaions 1cl=;( � . 'The Tulftrack'�'system has a high compressive strength bare product, Iillgill I .11 mean ng that Tufftrack does not rely on the fill material for load carryingI:r / ali --r II f d ��-- _{ , •..` writ r = d -r'i Recommended Use -� _ , ,r ,, ` • .- 14 . _ r f + • r� Light Loads: ' ,�� - CoifCart Paths — " r z) t ` ,l Jogging Tracks IN-, C q, _ Bike Paths �' -_ fiil ---_"-Y ;,y5i= A'IVPaths �' r`_ '�� '� •:� ,f 5 = `• t N }, Equestrian Parks rwgp Traci Reinforcements a i - -- ,--4 _ - Runoff Areas - I - 1 Medium Loads: r a .-a _ d - Roadway Shoulders , r g Residential Driveways • Parking Lots Overflow Parking Area Truck&Can Wash Down Areas - RV and Boat Access �. •rte.‘„,_ ' I Heavy Loads/Fire Lane: 4.7 I c 't - - r Fire Lanes itJ ' s 1 ' Emergency Vehicle Access Roads ' r! y " Service Vehicle Utility Roads ._ Truck Maintenance and Equipment Yards f • -;Construction Entrance Soil Stabilization / i.ijailkI I J i , Non-toad Applications , Erosion Control on Slopes;staking recommended) , Erosion Control in Swaies(staking recommended) , -a -- -- ,4 Not Recommended for the Following: _��-r Traffic on stupes exceeding a 10%grade "r' - _ z .----- To support tread driven vehicles - - Y for specs,detail drawings and case studies We put water in its place 5 '; f 4 The Tufftrack`" Grass Paver from. NDS is the latest and most advanced , product of its type on the market. NDS has used its years of experience in the landscaping industry to create a product with all of the most desirable features. I r The Tufftrack Grass Paver has a combined series of 120 nested hexagonal cells per paver cell with 12 connecting clips. This unique combination provides superior stability and durability. i I ) Empty cells have compressive Product Specifications strength of 86,563 lbs. Material.100%recycled Pofyo!efin plastic(50%pre-consumer 50% post-consumer).Polyolefin is rugged,flexible and ideally suited for —' " r outside exposure and longevity.NDS uses UV Inhibitors in the potynrer 4h/ structure to prevent breakdown in the strength of the paver. Manufacturing.Manufactured in the USA:Lindsay,CA.' i �11101 Recyclability. 100%recydabfe. i 410110111 �, Please recycle whenever possible. ,J _.' I �) Lti Paver Size.Each 24'x 24'x 1'h°panel contains 120,215°nested 0." ;` hexagonal cells.Each ref!has 6 arched cutouts at its base. %` ,, Weight Per Unit.4.0 pounds per 21"x 24"section. (. .1., � 4 , a Paver Details.The top surface of the hexagonal cell walls ,t Is smooth and devoid of notches or grooves. IV' \ 1 Assembly Mechanism.Each Paver section includes 10 sturdy Tongue and Groove locks per pane(,which provide secure connection between panels. i Chemical Resistance.Tufftrack1r•'Pavers have superior µ 5� "tc) 7el sir rajrF gal!( 1 / chemical resistance and are totally inert. oil: JJ ' ..04_,.......h.„ 4 ii,„:;,,,fr=,..r-171z.i . .-:' r ri.--. Compressive Strength(Empty Pavers):66 563 lbs. I Compressive Strength(Native Soil filled Pavers):400,000 lbs. ' r�( "`t�� r 4011, . --�1------ Unique Product-Features.Tufftrack—Pavers have features found in no other l grass paver product in the industry.Tufftrack features a unique domed opening �� ' f at the base of each hexagonal cell‘...all.This promotes a greater flow of water, 1 oxygen and nutrients.Additionally,the slot opening allows root penetration to 1 the soil below the paver and allows roots to grow between cells,promoting . healthier grass,In areas where drainage is critical,Tufftrack increases water runoff capabilities.The Tongue and Groove latching system is another unique . ,/.' feature which provides exceptional stability,longevity,and ease of assembly. ,ri` 6 v NDS° Visit ndspro.com/permeable-pavers TT‘ r v+:'r T t i �+ !n 1iii %1 I,/ / IP 04 ,r .`',! ii Yi Y .!f°, *. �� `s:' ib,�.}`r ` lk rya 3 r , p 416 Ai* .:..i. i .ate ...=a aft nba ..,' . *XX're to cornpare 'mak' .... , ► ti TufftrackR, - - - Grass Pavers are - . - . 25% STRONGER _.-..Q :.'.-.. .-; .a . . . . . , �• • • L ` l • • •than the competition ` • . -• : • . . .. ...e '` . . y., • ,e• •T• • • •a • • • � •- .. "'Compare the strength of NDS Permeable , • • ; • Pavers to the competition below. "4 .•.`-• .: ;: - a Max Load Area Max Load Panel Pavers Unfilled(lbs.) (sq.in,) (PSI) t , i NDS Tufftrack'"T124 86,563 144 601 i TrueGrid Pro PlusT" 64,361 144 i 447 s � i TrueGrid EcoTM 1 53,797 144 I 374 1 i Presto GEOPAVE® 1 35,682 144 i 248 I , "I p Presto GEOBLOCK®5150 I 35,220 144 ` 245 i AirPave Grass Paver 23,910 144 166 1 NDS Max load filled cells:400,000 lbs.(soil) Pro Plus'and Eco-are trademarks of Truo;;rid"Pn.ers.Presto GEOR•_OCK'and GLOPAVE"we regslued rad jna-1cs of Reynods Presto Products.Inc. , I f for specs,detail drawings and case studies We put water in its place 7 Case Studies - Tuff-track' Grass Pavers Emergency vehicle lane When the Tulsa Independent School District 1.J n i o n prepared to open a new school, the design learn needed to incorporate emergency • iligh S Ii I vehicle access roads leading up to the building and athletic facilities. The Tufftrack"Grass • Paver was selected for its high compressive Tulsa, OK strength of 81,744 psf and the flexibility either to sod or seed the area immediately following the 8,000 square foot installation. • • Emergency access lane • An emergency access lane needed to be added along the side of the property, but due H lton � to the large width of the lane and proximity 1 1 to the hotel, the owners wanted a solution .that would be aesthetically pleasing as well - �e Gar n Inn as functional. Tufftrace Grass Pavers were selected and installed. Twelve years later the Elk Grove CA site was revisited and inspected. The Tufftrack' r base is virtually indistinguishable from the rest of the landscape. The result was, and • still is, a highly functional fire lane that can be enjoyed by their guests when not in use. • 8 - NDS` Visit ndspro.com/permeable-pavers mar - .s- !" -..s—W_ IT..- , ' - ;-a-" - Tk . i Y #. 741.--....---"4- lil X-,-., ' -.r- -.. L , - a 0 . '-' v i '!. '.- II . iN t,. - Ng -,-,142t*, _ 0 ; :,/ , ,,,,, 41 16) , 47if , -0 ,r i , ), ..,, , „ , ,.i. ' 1 i . '...., s 3 f .406(.>'11 mid. _ A � ,Ss ,� i`r'k ' *Y4441'7"kyAkit 1 \araki s OK SW Mai AIWA" 7 40 ,. Installation As Easy As 1 -2-3 9 - . -� �_ _,...� - . 1 �* „.. - . 1f.G do .'`- �,.�4f Y N` ; 1 I 1 ''j.' I' /[li1,-1',-., ,..,• •,, -, x Lay it out s° '' Lay panels out in square or - 0 - offset pattern over prepared ' _ -tt" base to cover entire area , • - - ! '+ . eK N. =` = Clip it together �' '"f ` `,�` = _,. Tongue-and-groove latching system ,` ,, - � connects easily without special tools i I 4. _ ,� , - to create an integral paver mat '-, _ _ , ; 3 - --- $ Add soil infill - _ Fill the cells with soil N.._. _r;_`; and top with sod or seed tl � i I i t om' • 'p si ilii.'� i ki kw„, , . Y . �!Ji�-s fes . .... ' ��rw r 1 " -Y ' - For details&installation instructions visit 4.1./....,, s ✓ -• ' ndspro.com/specifications for specs,detail drawings and case studies We put water in its place 9 1. EZ Roth' Grass Pavers EZ Roll1M Grass Pavers A turf reinforcement, load transferring paving system designed to be placed directly on an engineer specified compacted road base. This system is designed to transfer vehicle weight directly to the supportive base course and prevent soil compaction. The web of interconnected honeycomb cells provides resistance from vehicular load as well as lateral containment that prevents the soil compaction that would inhibit healthy root growth.`l his system also provides a porous condition that allows rapid absorption of stormwater. EZ Roll'" Grass Pavers have a compressive strength of 53,683 lbs. in an empty condition and greater than 400,000 lbs.when filled with native top soil. The EZ Roll'" Grass Paver system has been used and accepted across the country for a wide variety of projects including emergency vehicle access purposes. Add;tonal informat,on,datais,and specticateons can be found at rttn./v...^,..nos=c o'rinrrma.;5,e-Dave-rsrgrass-pav slur.o",-grass-naves For farther tecnn.ca.,support or ase.starroc,Contact:tectr rrcee ndsprO.corn � t • s 4 • f tyt — 1 . `t • w1•r y111 V.k.1.6' O f/. ff.S Y ,i , r - d. Itt 110 7 . ti ,2 T4 eis:.11 -:r• . - - : t ,....., I --e A. 10 F NDS' visit ndspro.com/permeable-pavers l , ,'p 1 Design Theory ----- --� �,,,, The EZ Roll-Grass Paver comes in pro-assembled rolls,which means it is easy to roll out,decreasing Installation time and increasing efficiency. 1-- ' Abliiii. ., EZ.Roll'Grass Paver has been tested for compressive strength at 53,683 lbs.bare - �I "lor . •' � � product,meaning that EL Roll-does not rely on the fill material for load carrying. lei I� ... 14 Connections between rows of E1 Roll"are secure due to unique side-to-side and end to-end clips that minimize the paver mat movement and separation due to lateral and T�� �' horizontal pressure.These sturdylocking clips prevent paver displacement or mat 41 P 1--..., failure that could result from traffic load movement or changing ground conditions. I_ r...i, ,- .i,- .2., _ -i---r. ,,..,.. .". „ v , _ ;i_.._ w ,t, • ".,,.,,.„.,_.1. 4, ?f, I � Recommended Use - �”` _ - Light Loads: ___ $ __ 1 .�¢i''` /�' }C Golf Cast Paths _J r, - -�_ , - - ,,� ,.,---_ '-f... 10..- i` Jogging Tracks — _. }, Bike Paths :r n r,l '"J, Sl.-, _ --.ek , ATV Paths * , r- [� "_ . Equestrian Parks `'^- �y+' 4 _ -'r.' /-..... —.71 ,r -' • i`- ,1• Trail Reinforcements �MP' C' 4_ l Runoff Areas i (—� --_ r r ___ Medium Loads(occassional traffic): ✓ 4 Roadway Shoulders Overflow Parking Area _ Truck&Cart Wash-Down Areas J '' m- RV and Boat Access - ', ,. .y:4. Heavy Loads/Fire Lane(occassional traffic): _j r • , Emergency Vehicle Access Roads .►" , , sr Y , r • Service Vehicle ltt;ity Roads 'rP+.n'° ee •'a... -}. .' r yx Z -- � . ....ti � gip" V. - ,,r.. Non-load Applications: . ' `'' y 4, - /..-e i `�'t[. 4. • ,,,;., Erosion Control on Slopes(staking recommended) 4, ,i i /. ,..,'ivy 1 f'' Erosion Control in Swages(staking recommended) \f r 1 • y - - _ Semi-Trucks with Trailers _ =-- F ( ' x - '^4-*,-'-~ Not Recommended for the Following: _ —' p _ _ lc' • _ Traffic on slopes exceeCLng a 104'.grade , - To support tread driven vehicles , Frequent use traffic,since grass will not have time to recover !' for specs,detail drawings and case studies We put water in its place 1 1 I The EZ Roll' Grass Pavers from NDS is the latest and most advanced product of its type on the market. NDS has used its years of experience in the landscaping industry to create a product with all of the most desirable features. . Empty cells have a Product Specifications compressive strength of Material.100%recycled HDPE plastic(50%pre-consumer 50%post- 683 lbs. consumer).HDPE is rugged,flexible and ideally suited for outside exposure and longevity.NDS uses W Inhibitors in the polymer structure to prevent breakdown in the strength of the paver. Product ships in large rolls Manufacturing.Manufactured in Lindsay,CA for easy rollout Recyclability.100%recyclable.Please recycle whenever possiole. Easy to ~� connect / Paver Size.Each 24'x 24'panel contains 72,21'nested hexagonal r 4Il IlIi i, cells.Panels are integrated with crosslinks and clips to form rolls.Part -tel.r No.EZ4X24 has dimensions of 4'x 24'per roll and EZ4X1 50 has dimensions of 4'x 150'.Custom size rolls available upon request. eta 1i 1111 �/ I1I'I� / _..t� Paver Details.The top surface of the hexagonal coil walls is smooth / �I," - / 1r and devoid of notches or grooves.The bottom surface of the paver I `�i� mat has over 80%open arca for increased permeablity. ei. imi ; -- � - Chemical Resistance.EZ Roll'-Pavers have superior it l chemical resistance and arc totally inert. > � Cells).53683 lbs. ry Ai I' 4. II Compressive Strength(Empty1111011,4111,.�. f Compressive Strength(Native Soil filled Pavers):400,C00lbs. ``(, I--. f oil � --- ------ ---Unique Product Features:EL-Roir•Pavers feature ori easy � / to install top down locking feature.This locking mechanism �� J f/ allows pavers to be Installed quickly and easily. li I l'� I : 1, ., „.-,0,....win, „gm ' . ..: IL..... ___., \-e>„: , . 11 ,. rt;1� 12 ring.NDS° visit ndspro.com/permeable-pavers . ,,. „.,yr. .. 1 ' Hipp,d t `.'• - ;.4 ....r, �t _ 4 ,� . ---,,,/- f,(.1 4.' e , - ,', /. il i . '. 44i .Air ,.., /, 1 ter !. vg "Its.. '' ft'i 1 ; 'A lk, .. .N,Vc-44 , 1 p a i , , 4 - Da ye to Corn ® re , ry , _ . .._ _ __ _... __ _ . _ , EZ RollTM Grass Pavers _ are 25% STRONGER than the competition N k 1 Q N A Compare the strength of NDS Permeable Pavers to the competition below. I gm mor0 nib *NO 1141L Si It Max Load Area Max Load Roll Pavers Unfilled(lbs.) (sq.in.) (PSI) j l NDS EZ Roil'"' 53,683 144 i 373 ISI GrassPave2 40,623 144 282 , NOS Max load for soil-filled cells is 400,000 lbs:. ISI GrassPave'is a regit;tered trademark of Invlsi;zle Structures Inc, t for specs,detail drawings and case studies We put water in its place ;3 • rj . Case Studies - EZ Roll' Grass Pavers Z y. Fire lane and hump maintenance access Access to the buildingfacade was needed Taj for maintenance and o allow access for ., emergency vehicles. F7 Roll" was chosen for its strength and flexibility, but also for e Reso its aesthetic advantages.The abilityto sod Ca5 O 9 directly on top of the product reduced the time Atlantic City, NJ needed to seed and wait for growth, while keeping up appearances at the busy casino. • • ry . •• Overflow parking Ket ie A new school needed additional parking for ` their football program and looked to covert a former cow pasture they.owned across the ___ __HrgS street. The solution had to be aesthetically I pleasing, cost-effective and demonstrate to the community an ongoing commitment to White Settlement, TX supporting the environment. The 150,000 sq. ft. project was installed in just 10 days. • 14 NDS• Visit ndspro.com/permeable-pavers oir w.- / i 9 sib ',. 1 V `fid ` .Y + it:CI.. 14 r.y p� d h `1 i , i ,,,„ „ , _. ., . _,. / , , „,,, . y,NiSN , ) i t t ' s e ,I ti Installation As Easy As 1 -2-3 - , r1 ' - Roll it out ' Manufactured in pre-assembled — rolls for fast and easy installation over prepared base - Y-- �� 2 I 0 Clip it together - - yv __I-7, - `' kali Lateral snap-lock system -1- i t -_ - allows rolls to be connected �' 0ilijit.i.kiv% without any special tools +r yrs ^_,, Use suitable soil infill r` ”" and top with sod or seed v+ \ '- ° - per Local standards s 4 " +.-1... ---, + For details&installation instructions visit ''£ /' , r - le ) ndspro.com/specifications .� for specs,detail drawings and case studies We put water in its place 15 EZ Roll' 1 Gravel Pavers d I t I i i 4 EZ RollTM Gravel Pavers 1. 1. { f f A turf reinforcement, load transferring paving system designed to be placed directly on an engineer specified I , compacted road base. i 1 This system is designed to transfer vehicle weight directly to the supportive base course and prevent soil compaction. The web of interconnected honeycomb cells provides resistance from vehicular load as well as lateral containment that prevents soil compaction. This system also E provides a porous condition that allows rapid absorption of stormwater. F7 Roll`" Gravel Pavers I i have a compressive strength of 53,683 lbs. in an empty condition and greater than 500,000 lbs. r 1 when filled with gravel. The EZ Roll` Gravel Paver system has been used and accepted across i I the country for a wide variety of projects including emergency vehicle access purposes, I • I ri¢ Add it ona!+nformation,details,and specifications can be found at t ht.w li.wi-sv.ndspro.cornin;.•rmead'e-pavers/Gravel-pawcrstez-rofl=araveilmvers ,} For Further tecnrrcai support or assistance,contact:techeenrceVndSpo.corn i , ! ii II i i 1 1 : `6 *. i t'., . �t t 't .' Yid :::_- 7_,- ,•49 t t t 4 ay _ 1 3a�.y. rr� 'n ,¢cy,.l q.t7 ;' ', , j ,I; ,f,r.•;- 4; S.F i ,¢E'4 '+ mak, '; a.M }C 1.syn- Rf�y.$t, '` t t ? 4 J _ __� „...,,,b.,..;,„„--„,,,,,,,,,,,,,,,rs� 7` «« ; # - \ 3 ., 31.. a � Y P�i1d ' v ''*-7ifa*;;:4 `aS!Y`i ‘11 •r4{ t y, 4 rr�`-e t .7 ftt1� ` ., 4 . !`tti'_, ,; , ,44 ., .*.''..,aik'yg• A.i7S, ..*T,,,,A, _ ir-OSIC ke 17,,' +; '-4.---r', ' . 4 r EZ-.j-.1/4,:-,2,-,0,- .c" -,:,41-Z._i,:-,-*,.:',1__,,,,,,I-,.,-„,,'-,-, t i o n _6- L . NDS' Visitndspro.cam/permeable-pavers — - .i J .: . 1 . . . . . .. .. 1.0":41iiipti.ii Design Theory The EZ Per Gravel Paver comes in pre-assembled rots,which means /easy4111 ---... FA --- ,. itis to rot out,decreasing installation time and increasing efficiency. r ....___ , i Itlfritimiti 16 '‘k'.. "I 1 i u Rolf'Gravel has been tested for compressive strength at 53,683 lbs.bare product,meaning that EZ RotC does not rely on the fill material for load carrying. c,.... , ,,,,, EZ olk,,r Connections between rows of Roll-are secure due to unique side-to-side and I Mill111, 004 and-to-end clips that minimize the paver mat movement and separation due to lateral 1 hir---..._ and horizontal pressure.These sturdy locking clips prevent paver displacement or mat I Il--- it , failure that could result from traffic load movement or changing ground conditions. ; . _ _ ; - l• I I Recommended Use . - . ..--- Light Loads: ' f. - .-. Golf Cad Paths Ir. , 1 Jogging Tracks t -;:- Bike Paths t . , ATV Paths Ce..-1- • . . . . , . . Equestrian Parks ,... Trail Reinforcements . , . , „, Medium Loads: .e'4-- '?-v:2s•-1" .. --0 L:....,*.`"A,.'",',-r.,:,::'' , Roadway Shoulders sT-..-.1s.,),;;-1!P---. „,- 7.,...,;..,-::i7;-'e •'f,f-s.,..8" t''' :t,, ,-, :,,,. ,,,'za..;:-....,,,.,,"`,4t'," ' - ,:l.-Z k .-.';.-4-'- .,,1,!'".145,;.- 7.2..,7 ---,'-.4.,L Resider ihal Driveways t:-A-14-'.„4:-'g...."-*'Z'rat-'''' -;r"..t 1 --,:q,'''''-3‘;t'11`.-*-A`..w...13-,',2" X erbt t,-'.°4 ' 4'4F'4 .,•-•' . 1-4,r,......1 e",„Ards,r,...."1-,..-,,,,A6. ,,,::-,,,.......4.-_ ,.,,,,, ',,c..a.,,,•,,,..., .,..'.. ''...t.f2,,, , f..'...,,,,,i,./.. '-., '',...S,. Parking Lots s l'5,-- - ...--4.1E'.....t,,,liBrkel,:t- *.;,.‘ •,,'4.,..!..',- d'.:.-444,,A....,Z,,;:',Te, ,-,.b.i.z.. -:::-..,,C4`-'`.*N.,t," -. I Overflow Parking Area f.,, ‘3.*7:7[,41,,,,r,a, 1 af4.....lca' .;:b. ,,,C, ,_...-V,...-rp•V*.7,, 7'... .„,,....4'Nti...,,, ,tr:4, .....',.. ,....:,. . , Wr.It'%". ' t4C.,,W4114,g;,- 4149,e211e,... .ttk.41.-t;3:4r-ZAtiiit.' 'I Truck&Cart Wash Down Areas RV and Boat Access ... Heavy Loads/Fire Lane: - r----1'•' .. i.-= .11111 ---- - . '•.,7-.•--.1 -f4 1-',,,00.,--,- ' --`-• i.;-- — - - ,! Emergency Vehicle Access Roads It:. ..,'. ; _ _4 i_ . Service Vehicle Utility Roads F.Y.,-'......-I,r--:lity• - . . ,. ._- :_,- -.-. ...,..„„ ---- i , - .._,_ - Equipment Yards 't ,:r.',.f,,,- \ ' -- 7.:7 -1 t. Coostili/".,;...1S(...kr.,s‘jiV....0,x..i',r I'ly .1,r.3i•,yr !•t,.-isrf .;• ktitii. ,,,-;),-,-,,!-,..0...-A-,,–,..k-,e;ci::".,-,..",'s,,--..•:111.';•!...--".',,-•:?? •-•:';',.?.t, 1 4".-_...•,-:-/•:.-'' -L.--40.1111111•1111.7. ' Non load Applications: r‘,--- . ......,:: . t :- :..7-- , Erosion Control on Slopes(staking recommended) *''- :-7 "- * *-."-. :: c_ - Erosion Control in Swales(slaking recommended) . : F.:f..:: Not Recommended for the Following: Rt.',.-: :-_•- --.'.:...- .-_-..:.;-=-:_ ---- Traffic on slopes exceeding a 10%grade /-',7-t-`' -4 .; ' - -'- '.-4.-;,- --• -"- -.-t--,,--'lr.,:,,, '.; To support tread driven vehicles l.i....:z.:_,.,_... ..-- i:.-,".:- „-* -, 1r,- - - --_-',.,_-.•.,...-;*J.;:.''''"' ' ., ''.:_-; . i --• .,- .-- --,,. _ ,.7 -,- for specs,detail drawings and case studies We put water in its place ,, 17 I I. 1 i f , I .i The EZ RollTM Gravel Pavers from NDS is the latest and most i advanced product of its type on the market. NDS has used its years i of experience in the landscaping industry to create a product with all of i the most desirable features. 1 } Product Specifications Empty cells have a ;' compressive strength of Material 100%recycled HOPE plastic(50%pro-consumer 50%post- �. consumer).HDPE is rugged,flexible and Ideally suited for outside exposure and longevity.NOS uses UV inhibitors in the polymer 53 P 683 lb►s structure to prevent breakdown in the strength of the paver. v 11 Color.EZ Roti"Gravel is available in tan,black,brick rod,and gray Product ships in large rolls _1 to provide design flexibility, for easy rollout Manufacturing.Manufactured in Lindsay,CA. / 4,1.0 �~Easyto I..-- ,I' .100%re clable.Please re cle henever possible. " r Recyclabi tty recyclable. recycle I � Paver Size.Panels are integrated with crossl;nks and clips to form rolls. -L III I Part No.EZ4X150 has dimensions of 4'x 150'per roll. / `...,„-L r* ki,,� Custom size roils ava:;ab;e upon request. 1-_,,,,lik 117 .,, Paver Details.The top surface of the hexagonal cell walls is smoothy+i. &JII I,, and devoid of notches or grooves.The bottom surfaceof the paver W / f1 mat has over 80%open area for increased permeability. { 0 Resistance.EZ Roil"Pavers have superior �.i. Chemical ResI4 1111 t �t Ir chemical resistance and are totally Inert. , 41Ifl_'� Ir I� I Compressive Strength(Empty Cells):53,683 lbs. (/`1111111 4 _ _ __,______--Compressive Strength(Gravel=Fillad•Pavers) 504,444 lbs. ' t I l iUnique Product Features.FJ Roll"Pavers feature en easy l r �,.�1� to install top down locking feature.This locking mechanism I c allows pavers to be installed quickly and easily. f�f\ �I 1lPII. f, Our fabric Is fused to the paverusing a proprietary - heat-and-pressur tsi t process ii p+Is n nti ,i 1 18 . amu. NDS` visit ndspro.com/permeable-pavers ,..,_..„4„:,/,..._, ,, :, 4, .‘ ,t, 1,, ,,,..\--,,..../-7-:)......_: 4.' ...,17,4tLle..t...c"-4.--' „..,c-), .”: d.,..,,Zr3:-.13:4!,-i'l -1:4_1*-:.'', .•• r ..l.:7AL..:1r-iiii,:efi:::74‘L. 1.)1,... 6,- , '. r*.....,r,"-i---y..., , iwt„.I., _. , , \ ..,tik.c.r•, ,,,,, , 1......, ...)..\:. • , ( i, I ' Ile'l si ., ... , 4 `•.4,..........c \::‘: - r ' __\ 1. '-. rAA l'''. ‘s / ' ''' '„ f s - ... . .," s-..=_ .— -= of 4°I. #4. ---—- '.. . • % I '''' • , ' •. - . Dare . co o€ mpare -- - - . [ 1 _. .., . __ _ . . ._,. :-.., , , .., TM 1 ' ' EZ Roll Gravel Pavers ,r 1 are 25% STRONGER c ! „ , . than the competition i I 1 , Compare the strength of NDS Permeable I ' i 1 Pavers to the competition below. I .. .,.. i , „., _- .• 1 , ... ,___,,,,yir, ,.:4-,-,-;,,..--„,.zir -- .-, •v.....r (4‘'.1 1" '..i.„'.,, ,,,";%.-,--'' '7'.. ::6'.'-.- '-• ' .- ' • ''' I i.'" * ' 'T 'AV'' WI 4$' F...ii kv,,i%, -..0,-.;•.,---4*-----,..-• • : - I i ; ,.,' __ •.4- • . A.. 1;.-,'4,4 ,Atost.•"-tr'-tt.'‘',...`„,„;XL-,‘f• ;.t A:',Z.'k,s.:Ix,„':-t 4..- • .Tle 0"..4'4'7 A - v,„''.,:" Z'T,l',"•A';..1t--ki„, .1,..e ...? .7,- r t,1- •-v-It 4e .1! "-^r--,, ,....t , "Li.' ?, • 4'- *2.-‘i ,..7- '..::'`"`" - ALP' * - ..• IN",#. "I'L.# • Y,4,. #.. .A. 'IL, ze,.,- ,st, ,,,, , i . . . ati- .k... e-4,.„,•-•*,...e 4 7....4„.% - 4,;'-4,- 1,:, 1_,s 6 %LP.,-,0.2' 4- 4.4-:n."1..... ,,..4',,k A 7. *.... k 6 -ki.**, .''' 'I' - L''S-A-A,:.•"'Nr-:...- ' i . 4'. e.4,1,.• --5.,!it.. . , ,,a, c- fr,„7,1-... ^,-...-.. i'--'.--- 6 ' ''' - ' , lr 446-A ' - ir.. .0-•-. 1:—S-L*1---it,ir:4-61. 117i6; r ' F t 1 I ' i 1 ' , • Max Load Area Max Load ' } Roll Pavers Unfilled(lbs.) (sq.in.) (PSI) 1 . ' I . i I , , 1 NDS EZ Rolr -53,683 , 144 373 , 1 ! 1 i 144, , 248 . , ISI GravelPave2 ,, 35,682 1 . NDS Max load for gravel-filled cells is 500,000 lbs. 1 ' i 1 !SI GravelPave=is a registered trader nark of liwisiole Structures Inc , i t for specs,detail drawings and case studies We put water in its place 19 Case Studies - EZ Roll' Gravel Pavers Daily parking The arboretum is a high-profile facility in Dallas that generates critical tourism and income to the area. [lasThe busy arboretum needed additional parking to Dalls accommodate a predicted rise in traffic volume over the next decade and wanted something Arboretum that would blend in with the natural surroundings while handling heavy amounts of traffic. They also Dallas Texas wanted a permeable solution that could mitigate stormwater runoff. E7 Roll"' Gravel pavers were selected for their strength, durability and ease of installation.The project was completed in two phases totaling 185,000 square feet. • • Parking and Gastonia • heavy vehicle access An Army facility,, the Gastonia Readiness Center was adding two separate buildings for soldiers Read 'nesJC and equipment along with a new parking.lot for forty vehicles.The new 16,000 sq. ft. lot ce1 Iter needed to supply daily parking, but also function as an emergency access lane capable of Gastonia/ supporting the weight of National Guard military vehicles. EZ Roll" Gravel was selected for its strength, permeability and overall aesthetics. 20 �� Visit mdspro.com/permeable-pavers — — - -J--N, ' - •:- '7 T ,,, "I -- :_ ' i ''-'1 i /- ,-_ r .., I. c .10- ,--".. ,,,..- \ , ......--k '1' LCI'''''''(-4'' ',1Z..AelY-''.41‘-'1. --,,..i.--r 4, A-4, -' ..,, ,e,....f-,. ,4. --. - `.-r i k k ) r 1 i Vr i• fri.-1 ,- 'elv \- 4 -- k ,, -.-,Q-- ,..,-..„. .A • e•.-A 011:<-1 -4,....yt.k,....', , 1, ..-. -k,„(\:),_.r,,,ht!i, '4‘, ...4, L.1.;"1. ' , -- • , \ ,--\e— 1 \ — 0- 10:._,a-,„ --A--,, ., < f ' ),,, ..";*"..:. eiT4-N, Pt ---?•-,, '."4"''': -4‘.3 Q!."14' '-‘ 'I V:.4:-'11 . -i•'--. s - l'ilPf s - :1:1 ,Lf,"4,,,A."-1..,,,1,-fin? \, ....eir:..::,17,- , ' - ‘ \ ,N. , ?•• , \ 'd./... - ri ....... W. fr i. k ' . •li '.-. .3'' . r 'g , tyi , \ ... . - 1------r-t ' -" ' I \L r , 1 . , . , I ? 1 , I, i \- -14V \ 1 -, L ii IL.,.,.......Aillik.....i-,ii .- ._....-, - . _ . )" ,\ '_- __...._-;_ ,, _ ., _____ , . r--- i 1, '' Installation As Easy As 1 -2-3 -' . . _ . . ,-1,, -._ _ -N,‘ ,,r''-';-------- . i•-'----::----7--.--72——= -'1--: 1 ; 4 . - • Roll it out • - ,, ..0 •-•,,• ,• Manufactured in pre assembled rolls for fast and easy installation • over prepared base • - ' _4.4:4: —-1 . , i -t:Al :,..-1c4, vf--_.-:..,---- _-..- - ..• : .. , • --•_t;-,-':,- ‘, ..-..-„- :-; :-_'; ?• i 4 a ''''-_ , - -'•t". ...... -' 4.-1-..' `"••4 .••,4-.---4*.-.4.- _.. •. '- rlit -•- -• - • • . , % - • *-"• . 1,. 1,, .- -,,,,,,•, : , ,, . • . 2 • 1 -- . -------„: .moso 1 , Clip it together ,.. , . - -... , Lateral snap-lock system . .',,, ,,,,.-:„ •-••-- allows rolls to be connected , hp- 1 A 4 ' \fi.k\\,',IZi.,':,`::::,,s' '''\--, without any specal tools . , ...* 1'Ii •_ ';-- •.. .---• .114‘14,N. \\-7.!;*-Z.--i-,,---2 - , ._ . ' 4,2,14- _ vr..A. ltii. . . -:•.„_...---_:„..-, __ _-:-•,- , Fill with gravel , . , . • Use clean gravel that is • .. . .„„ie, .., :."1te uniform in size, 3/8" angular stones work best" . , , . •1.- „ '3..- - z . • --• - . . ,.. ... , ...-. /IP - • - — - .* ,.. 4 -Ay. •` -'. ' - . ,. . • 4. ' . 14;'1 . ' - 4 - - , - , • q -. . -•,. . . . For details&installation instructions visit • - - ......._ ndspro.com/specifications , *,....,..,....,,,,... ----- .... for specs,detail drawings and case studies We put water in its place 2 Contribution to LEED F7 RoIlTM and TufftracktM Pavers can be used in a number of categories that contribute points to LEED certification according to LEED v3. Category: Sustainable Sites Credit 5.1 Site Development-Protect or Restore Habitat(1 credit): Conserve existing natural areas and restore damaged areas to provide habitat and promote biodiversity. j . To attain this credit,all site disturbances during construction must bo limited to within a certain distance from the building perimeter. Use of EZ Roll"and Tufltrack"extends the allowed area of site disturbance from 10 ft.to 25 ft.,taus providing more area to work during Construction. • ▪ EZ Roll-and Tufftrack-seeded with native plants in place of asphalt or other non-pervious surfaces will contribute to the overall percentage of habitat restored. o For projects that qualify for 5.2(below).use of E2 Roll"and Tufftrack`Pavers on a vegetated roof with native or adapted plants can contribute to overall percentage of habitat restored or protected. Credit 5.2 Site Development-Maximize Open Space(1 credit): Provide a high ratio of open space to development footprint to promote biodiversity. ( Application of E2 Roll'and Tu track"provides vegetated open space that will contribute to the open space requirements. • Use of EZ Roll-and Tufttrack'on a vegetated roof can contribute to credit compliance. Credit 6.1 Stormwater Design-Quantity Control(1 credit): Limit disruption of natural water hydrology by reducing impervious cover,Increasing on-site infiltration, reducing or eliminating pollution from stormwater runoff,and eliminating contaminants. • EZ Roll"and Tufftrack'-can be utilized as part of a stormwater management plan as it reduces impervious cover,increases on-site infiltration.and reduces po`ution from stormwater runoff. • EZ Rolf-andTufftrack"can be used to maintain a vegetated roof,which will minimize impervious surface area onsite. Credit 6.2 Stormwater Design-Quality Control(1 credit): To limit disruption and pollution of natural water flows by managing stormwater runoff. o EZ Roll-andlirffirack"can be utilized as part of a stormwater management plan as it reduces impervious cover,increases on-site infiltration,and reduces pollution from slorrttwater runoff. Credit 7.1 Heat Island Effect-Nonroof(1 credit): To reduce heat islands to minimize Impacts on microctimates and human and wildlife habitats. As open grid pavement systems,the use of El Roil'and Tuffirack-reduces heat absorption and contributes to the overall hardscapeci area calculation for this credit. r e Credit 7.2 Heat Island Effect-Roof(1 credit): To reduce heat islands to minimize impacts on microclimates and human and wildlife habitats. • E2 Roll"and TuHtrack"'utilized on a vegetated root can reduce heat absorption. Category: Materials and Resources Credit 4.1 Recycled Content:10%(post-consumer+'h pre-consumer)(1 credit): Increase demand for the building products that incorporate recycled content materials,thereby reducing impacts resulting from extraction and processing of virgin materials. • EZ Roll-and Tulftrack"'is made from 100%recycled HPPE(approximate blend is 50%penal-consumer.50%pre consumer material). Utilization of this product will increase the proportion of materials used on site that are recycled,and can contribute towards attainment of this credit. Credit 4.2 Recycled Content:20%(post-consumer+' pre-consumer)(1 credit): Increase demand for the building products that incorporate recycled content materials,thereby • reducing Impacts resulting from extraction and processing of virgin materials. . As cited in credit 4.1 (above),utilizing EZ Roll'and lufftrack"can contribute to the attainment of this credit,if used in a larger proportion on site relative to the prot)ortiorr of materials that are not recycled. E 7 ' l 22 "u NDS° visit fndspro.cam/permeable-pavers NOTES 1 it _ ! 1 1 for specs,detail drawings and case studies We put water in its place Permeable Pavers Reinforced Turf & Gravel Systems High Performing. Proven Durability. Easy Installation. TufftrackTM EZ RoLLTM EZ RollTM Grass Paver. Grass Paver Gravel Paver • it' r. y. Fair } .�• r-4 _ ___ I4\ `. ,..Z.`.4.01:"0.• 4 ,` ., lam,^ "� _ 1 1 , a pew • l _ L 1�. /L t Ng 7 � lt •' .� , ..+ ir" /��� ® /4 Visit ndspro.com for specs, NDS customer cervico D �� 851 N.Harvard Ava.,Lindsay,CA 93247 t��N detai'cis-iaiiiEic zinc r-ofte studies Phnom 800.726.1994.559.5629888 4MIiV Fax 800.726.1998.559.5624488 We put water in its place