Loading...
Resolution 2021-31595 RESOLUTION NO. 2021-31595 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, DIRECTING THE ADMINISTRATION TO REQUEST FLORIDA POWER AND LIGHT ("FPL") TO SUPPLY ELECTRICAL RELIABILITY DATA FOR THE PUMP STATION LOCATED AT 32ND STREET AND THE INDIAN CREEK DRIVE STREET END (THE "PUMP STATION"), AS PART OF THE INDIAN CREEK DRIVE FLOODING MITIGATION PROJECT PHASE III, IN ORDER FOR THE ADMINISTRATION TO DETERMINE IF A GENERATOR IS REQUIRED FOR THE PUMP STATION. WHEREAS, the City of Miami Beach is committed to preserving the welfare and safety of its residents, visitors, and businesses and one way that the City meets this goal is by adapting its infrastructure to sea level rise and climate change; and WHEREAS, on July 31, 2019, the City Commission awarded the Indian Creek Drive Flooding Mitigation Project, Phase III (the "Indian Creek Phase III Project") to Ric-Man Construction Florida, Inc. via Resolution #2019-30915, and the Indian Creek Drive Flooding Mitigation Project is currently in the construction phase; and WHEREAS, construction for the Indian Creek Phase III Project commenced during the week of March 2, 2020, and the Indian Creek Phase III Project is approximately 30 percent complete and is expected to be completed in Fall 2022; and WHEREAS, the plans for the Indian Creek Phase III Project currently include a pump station to be located at 32nd street and the Indian Creek Drive Street End (the "Pump Station"), and the plans also currently specify that a generator will be installed to supply the Pump Station with a redundant power supply; and WHEREAS, on October 14, 2020, the City Commission approved Resolution No. 2020- 31462, accepting the recommendation of the Land Use and Sustainability Committee ("LUSC") to implement generators on a case-by-case basis for stormwater pump stations; and WHEREAS, one of the most important aspects of the flood mitigation program are effective pump stations that properly treat and convey the stormwater, and one of the most important aspects of the program's resilience is the ability to maintain power for these pump stations through shocks and stresses; and WHEREAS, while permanent generators are an excellent way to provide redundancy to the stormwater system, they often require additional engineering, site planning, additional costs, aesthetic improvements, and community involvement; and WHEREAS, residents that live in neighborhoods with proposed generators have, at times, expressed concerns related to their aesthetics, noise levels, and maintenance operations; and WHEREAS, while the City is committed to resilience—and redundant power supplies are a key component of resilience —the City is also keenly interested in placemaking and enhancing neighborhood aesthetics; and WHEREAS, recent conversations with Florida Power and Light ("FPL"), the primary electric power supplier for the pump station, have identified that the City may be able to establish electrical redundancy for certain pump station locations without the use of backup generators; and WHEREAS, in cases where FPL categorizes a pump station as critical infrastructure, the stations would include dual primary feeds from independent substations with automatic transfer switches; and WHEREAS, by utilizing this configuration, if one of the electrical feeds is rendered inoperable, the other primary feed would automatically supply power without interruption to the pump station; and WHEREAS, pump stations categorized by FPL as critical infrastructure would be reviewed by FPL and the City's Public Works Department; and WHEREAS, in order to determine if a generator is required for the Pump Station as part of the Indian Creek Phase III Project, the Administration will need to determine if FPL is able to provide dual primary feeds to the Pump Station so substantial electrical redundancy can be provided to the Pump Station; and WHEREAS, the elimination of the required generator for the Pump Station would result in substantial cost savings and aesthetic improvements for the community; and WHEREAS, the Administration recommends that the City Commission adopts the Resolution to request FPL to supply electrical reliability data for the Pump Station in order for the Administration to determine if a generator is required for this location. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby adopts this Resolution and directs the Administration to request Florida Power and Light ("FPL") to supply electrical reliability data for the pump station located at 32nd street and the Indian Creek Drive Street End (the "Pump Station"), as part of the Indian Creek Drive Flooding Mitigation Project Phase III, in order for the administration to determine if a generator is required for the Pump Station. PASSED and ADOPTED this /0 day of F:brkp , 2021. ATTEST: Dan Gelber, Mayor 2122 ;T Rafael E. Granado, City lerk "" TINICOP�POPRATED; = APPROVED AS TO FORM 8 LANGUAGE ,N 6 �'�9/....• ` = a FOR EXECUTION 'n l-r %i1� _ , {•'2 2) City Attorney Date Resolutions -C7 AB MIAMI BEACH COMMISSION MEMORANDUM TO: Honorable Mayor and Members of the City Commission FROM: Vice-Mayor Steven Meiner DATE: February 10, 2021 SUBJECT:A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, REQUESTING FLORIDA POWER & LIGHT (FPL) TO SUBMIT A REDUNDANT POWER DATA REPORT FOR THE INDIAN CREEK PUMP STATION. ANALYSIS In October 2020 the Commission unanimously approved an initiative to eliminate the requirement that all new stormwater pump stations include a dedicated power generator. Previous to the passing of this legislation, all stormwater pumps required a generator. Now the determination whether a generator is needed will be made neighborhood-by-neighborhood based on redundant power source data provided by FPL and resident input. Eliminating unnecessary generators save our residents from a significant eyesore. It could also potentially save our City millions of dollars. This resolution seeks redundant power source data from FPL for the Indian Creek stormwater pump station to help determine whether a generator is required for this project. Please feel free to contact Amadeus Huff for additional information. SUPPORTING SURVEY DATA, N/A. Applicable Area Citywide Is this a"Resi_dents Right Does this item utilize G.O. to Know" item, pursuant to Bond Funds? City Code Section 2-14? No No Legislative Tracking Vice-Mayor Steven Meiner Page 547 of 1252