Loading...
2003-25406 Reso RESOLUTION NO. 2003-25406 A RESOLUTION OF THE MAYOR AND MEMBERS OF THE CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, RATIFYING A CONTRACT IN THE AMOUNT OF $105,000 TO LEGACY POOLS OF SOUTH FLORIDA, INC., FOR THE DEMOLITION OF THE EXISTING FOUNTAINS AND THE INSTALLATION OF NEW FOUNTAINS, PUMPS, FOUNTAIN LIGHTING, AND FOUNTAIN EQUIPMENT ON THE 700 AND 1000 BLOCKS OF LINCOLN ROAD. WHEREAS, during the programming and design of the fountain enhancements for Lincoln Road, the complete demolition and replacement of the existing fountains on the 700 and 1000 blocks of Lincoln Road was required to meet the design criteria and fountain performance features as outlined in the Lincoln Road Lighting and Fountain Enhancement Project plans; and WHEREAS, the Mayor and City Commission, at its May 8, 2002 Commission meeting, adopted Resolution No. 2002-24848, which authorized the Property Management Director to serve as the Certified General Contractor for the Lincoln Road Lighting and Fountain Enhancement Project; and WHEREAS, the Property Management Director exercised the authority given to him by the City Manager and City Commission, and prepared a bid package that included the necessary requirements for the demolition of the existing fountains and the installation of the new fountains, pumps, fountain lighting, and fountain equipment required for the placement of new enhanced fountains on the 700 and 1000 Blocks of Lincoln Road; and WHEREAS, five contractors that specialized in fountain installation work were contacted to provide quotes for the scope of work for the Project of which three provided bids for the Project; and WHEREAS, the Property Management Director, after reviewing the bids, checking references, licensing, and insurance requirements determined that two of the bids were deemed unresponsive due to the contractors not providing bids on the full scope of work and that Legacy Pools of South Florida, Inc. provided the lowest responsive responsible bid for the work; and WHEREAS, a contract with Legacy Pools of South Florida, Inc. in the amount of $105,000, was prepared and form approved by the Legal Department, and executed by the Mayor and City Clerk for the demolition of the existing fountains and the installation of the new fountains, pumps, fountain lighting, and fountain equipment required for the placement of new enhanced fountains on the 700 and 1000 Blocks of Lincoln Road; and WHEREAS, as required by Resoiution No. 2002-24848, the Administration herein requests that the Mayor and City Commission ratify the aforestated contract which is deemed necessary to continue the work on the Project. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby ratify a contract, in the amount of $105,000, to Legacy Pools of South Florida, Inc. for the for the demolition of the existing fountains and the installation of the new fountains, pumps, fountain lighting, and fountain equipment required for the placement of new enhanced fountains on the 700 and 1000 Blocks of Lincoln Road. PASSED and ADOPTED this 25th ,2003. n:;;ST:~ CITY C!RK APPRoVED AS TO fORM & LANGUAGE & FOR EXECUTION 1f(~ 11-(;;-r/3 ~ Date CITY OF MIAMI BEACH COMMISSION ITEM SUMMARY ~ -=- Condensed Title: Ratification of a contract to Legacy Pools of South Florida, Inc., in the total amount of $105,000, for the demolition of the existing fountains and the installation of new fountains and fountain equipment on the 700 and 1000 blocks of Lincoln Road as Dart of the Lincoln Road Liahtina and Fountain Enhancement Proiect. Issue: Shall the City Commission ratify a contract, in the amount of $1 05,000, to Legacy Pools of South Florida, Inc., for demolition and reconstruction of the 700 and 1000 block fountains on Lincoln Road as part of the Lincoln Road Liahtina and Fountain Enhancement Proiect? Item Summary/Recommendation: In accordance with Resolution No. 2002-24848 adopted by the City Commission on May 8, 2002 the Administration, through its Property Management Director, is providing General Contracting services including bidding, the award of contracts for work, and change orders on the Lincoln Road Lighting and Fountain Enhancement Project Under the provisions of the Resolution, contracts or purchases exceeding $25,000 must be brought to the City Commission for Ratification. In accordance with the Resolution, five Fountain contractors were contacted to provide quotes for the work. Of the five companies contacted, three submitted quotes. Legacy Pools of South Florida, Inc., was determined to be the lowest responsive responsible contractor for the project A contract was developed, form approved by the Legal Department on September 17,2003 and executed by the Mayor and City Clerk as required. The Administration recommends that the Mayor and City Commission ratify the contract with Legacy Pools of South Florida, Inc., for the demolition of the existing fountains and construction of new fountains on the 700 and 1000 blocks of Lincoln Road as part of the Lincoln Road Lighting and Fountain Enhancement Proiect. Advisory Board Recommendation: I N/A Financial Information: Amountto be expended: Source of Amount Account Approved Funds: 1 $105,000 # 365.2115.69358 D 2 3 4 Finance Dept Total $105,000 # 365.2115.69358 City Clerk's Office Legislative Tracking: I Si n-Offs: AGENDA ITEM DATE C71'1 //-;)f"-o3 CITY OF MIAMI BEACH CITY HALL 1700 CONVENTION CENTER DRIVE. MIAMI BEACH, FLORIDA 33139 http://ci.miami-beach.fl. us COMMISSION MEMORANDUM DATE: November 25, 2003 TO: Mayor David Dermer and Members of the City Commission Jorge M. Gonzalez \.. City Manager () ~ A RESOLUTION OF THE MAYOR AND MEMBERS OF THE CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, RATIFYING A CONTRACT IN THE AMOUNT OF $105,000 TO LEGACY POOLS OF SOUTH FLORIDA, INC., FOR THE DEMOLITION OF THE EXISTING FOUNTAINS AND THE INSTALLATION OF NEW FOUNTAINS, PUMPS, FOUNTAIN LIGHTING, AND FOUNTAIN EQUIPMENT ON THE 700 AND 1000 BLOCKS OF LINCOLN ROAD. FROM: SUBJECT: ADMINISTRATION RECOMMENDATION Ratify the resolution. ANALYSIS The architectural programming and design of fountain enhancements on Lincoln Road included the complete demolition and re-construction of the ornamental fountains on the 700 and 1000 blocks of Lincoln Road. The construction included the complete demolition of the existing fountain and fountain equipment and the installation of new exterior walls of the fountains, pumping equipment that is sufficient to operate the new fountain features, pool lightings, and the associated controls, piping, and electrical conduits required for the construction of both fountains. The fountain designs were approved by the Historic Preservation Board for use on Lincoln Road. The Mayor and City Commission, at the May 8, 2002 Commission meeting, adopted Resolution No. 2002-24848, which authorized the Property Management Director to serve as the Certified General Contractor for the Lincoln Road Lighting and Fountain Enhancement Project. The Property Management Director exercised the authority given to him by the City Manager and City Commission, and prepared a specification 1 bid that reflected the needs and applicable code requirements for the installation of the new fountain basins, electrical piping, plumbing piping, pump vault, lighting requirements, fountain features, pump equipment, and other components required for the construction of the new fountains. After completing the specifications, five firms that specialize in fountain construction were contacted to provide quotes for the fountain construction work. Of the five firms that received bid packages, three submitted quotes for the project. After reviewing the quotes, two of the firms were considered unresponsive due to their proposals not including the full scope of work. One would only supply materials and the other would not perform the demolition required for the project. After checking background references, licensing and insurance requirements, the equipment to be used on the project, and past work completed by this company, the Property Management Director determined that Legacy Pools of South Florida, Inc., was the lowest responsive responsible bidder on the project. A contract was prepared with Legacy Pools of South Florida, Inc., in the amount of $1 05,000, and was reviewed and form approved by the Legal Department on September 17, 2003. The contract was then signed by the contractor and executed by the Mayor and City Clerk as required. The Administration recommends that the Mayor and Members of the City Commission of The City of Miami Beach ratify the Property Management Director's contract to Legacy Pools of South Florida, Inc., in the amount of $105,000, for the demolition of the existing fountains and the installation of new fountains, pumps, fountain lighting, and fountain equipment on the 700 and 1000 blocks of Lincoln Road. JMG/RCM/FB/BAJ C:IMy FiIosVJncoln Road Commission MemosIUncoIn Fountains Memo_DOC 2 z o in :!... ofd ...., zO wa:: ::Ell. Wz Sio zl= cC~ ::Eoe') ~ffi. a::a::'" w ~ lI.rnq OZ a::C" lI....m :z:Z'" (.):)z i:jeo m"'~ -Ci!'" ::E::EO !;z:) ::E...CJ 1&.0 0(.) ~iE -... (.) '8 t) fD 1I. c 0 I ~ It: (:) 0 Z ~ ! .!! 0 CI. 1 j 0 0 z u 0 .5 0 tA g2:0c t) c ~l5,g.~ ~ ro-c..!! CDt)I~ ~ E fD I&. CI. t) __0- ... ~ ::Jo- CTZ 0 W Z .... j 8 -g .n -8 tA ... ::J Gl '8 C') ~.~ 8 ... 1I. ... ~ I w .. w .f! :z: o .. rn !. Eo z ~ Oz E 0 t) ~ .... c 8 :) .!!! m c::i ~ ~ III 0 CD C 0 ,it I iii J 0 I ... I&. III CD a:: .... 1i z 'r 0 1I. 1= i 1I. ii2 (.) > rn J w 0 III ~ C ~ rn CI. ~ E .3 JL1E(G}~'C1( }P\O'OL5 OF SOlITH FLORIDA, INC. Fountain & Commercial Division TO: City of Miami Beach Attn: Vivianna Date: 10/30/02 Re: Lincoln Road Mall 700 & 1000 Block Fountain Renovations PROPOSAL L-1054 Per your request, I offer you the following revision to the original design and proposal to furnish and install material, and construct structures in complete accordance with the specifications listed in this proposal for the sum of $10!,;.OOO.oo, Any alteration or changes from specification will be executed only upon written orders and will be a charge, over and above this proposal. 6508 Ibis Way . Coconut Creek, Florida 33073' (954) 571-6881 . (954) 571-6838 Fax . (954) 448-3383 Cell L-1054 INCLUDED: ,/' Removal of existing water feature basins and hauling of debris. This does not include removal of existing equipment pit and vault (refer to not included section). ,/' Form and build two new water feature basins each approximately 20' in diameter by 22" deep with reinforced concrete. ,/' Standard diamond brite for waterproofing of the interior of basins. ,/' Standard waterline tile from selection to be given. ,/' Pre cast coping in a choice of colors and profiles to be given. ,/' Set all fountain equipment listed below in an equipment pit in the planter areas no more than 50' away. ,/' Excavate and run intake and discharge lines from the fountains to the equipment pits. ,/' Adjustment of all equipment at start up. ,/' Will initiate the chemical startup and cleaning. ,/' Plans, engineering, and permits. NOT INCLUDED: · Removal or replacement of any landscaping, walkway or paving. · City is responsible for advising Legacy Pools of any existing sewer, electrical, gas, or any and all existing pipes that are in the way of the areas to be excavated. It is not the responsibility of Legacy Pools of South Florida Inc. if any such lines are damaged in these areas. · Electrical. · Fresh water hookup and connection of drain lines to waste. · City must allow adequate access and parking for all construction activities, vehicles and equipment. · Bonds or any necessary fees required to do work for the City of Miami Beach. 2 FOUNTAIN EQUIPMENT FOR 1000 BLOCK: 1- LC6 Bronze cascade jet to spray up approximately 8' high. 6- LC3 Bronze cascade jet to spray up approximately 4' high. 12-LC2 Bronze cascade jet to spray up approximately 2' high. 18- Brass risers and valves. 1- 10 hp main feature pump. 1- Intake and discharge manifold. 1- L33 stainless steel main intake screen. 1- LSV sidewall air vent. 20-LSL3 300 watt 120v bronze UL listed underwater light fixture. 2- LSJ UL listed bronze underwater junction boxes. 1- LFS filter system to include sand filter, 3/4 hp filter pump, skimmer, eyeball and vacuum fittings. 1- LCP Fountain control panel to include water level, low water cutoff control and wind control. 1- LOD combination over flow and drain. 1- LBC3 for center jet stubup. 6- LBC15 for peripheral jets stubup 12-LBC75 for outer jets stubup 3- LBN for conduit stubup " /-- 1.__. 3 FOUNT AlN EQUIPMENT FOR 700 BLOCK 1- LC3 bronze cascade jet to spray up approximately 8'. 16- LA2 aerating jets to spray up approximately 4' and into the middle. 1- Intake and discharge manifold 1- 7.5 hp main feature pump 1- 1.33 stainless steel intake screen 1- LSV sidewall air vent. 8- LSL3 300 watt 120V UL listed bronze submersible light fixture. 1- LSJ bronze UL listed submersible junction box. 1- LFS filter system to include sand filter, 3/4 hp filter pump, skimmer, eyeball and vacuum fittings. 1- LCP fountain control panel to include water level, low water cutoff control and wind control. 1- LOD combination over flow and drain fitting 2- LBN for conduit stubups. 4 Lincoln Road Lighting and Fountain Enhancement Project Budget and Project Status Report As of 11-2003 This report serves as a status report on the Lincoln Road Lighting and Fountain Enhancement Project and outlines the funding sources for the project. Information is also provided on the current status and work accomplishments on the project. Fundina Date 03/06/2000 OS/29/2002 OS/29/2002 Source General Obligation Bond Save Americas' Treasures Grant Redevelopment Agency Amount 200,000 135,000 608,636 Total Funding: $ 943,636 Expenditures Architectural/Engineering South Dade Electric, Inc. 60 Light Poles Veazey Group, Inc. 160 Stanchion Tree Lights Mercedes Electric Supply, Inc. Electrical Materials & Supplies Branching Out, Inc. Light Pole Installation Legacy Pools, Inc. Demolition & Replace Fountains Veazey Group, Inc. 165 Tree uplights Mobile Storage Group Job site container Rental Able Sanitation, Inc. Portable Restroom Rental Property Management Staff Costs 112,000 86,518 45,600 40,000 135,000 105,000 50,775 1,500 1,000 64,123 Total Expenditures: $ 641,516 Project Balance: $ 302,120 Project Schedule Although some significant delays were experienced due to design review revisions, the project is currently under approved building permits and proceeding as planned. Due to the onset of the South Florida tourist season and major public events scheduled in the South Beach and surrounding areas, a shutdown of the project is anticipated to take place in mid November and continue through January 200'-1. The projected completion date for the project is May 2004. Property Mgt. Division Public Works November 2003