Loading...
2003-25405 Reso RESOLUTION NO. 2003-25405 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, RATIFYING A CONTRACT IN THE AMOUNT OF $135,000, WITH BRANCHING OUT, INC., FOR THE INSTALLATION OF UNDERGROUND ELECTRICAL CONDUITS AND THE INSTALLATION OF STRUCTURAL CONCRETE FOUNDATIONS FOR THE PLACEMENT OF POLE LIGHTS ON LINCOLN ROAD. WHEREAS, during the programming and design of the lighting enhancements for Lincoln Road, the placement of pole lights to enhance lighting levels was required in areas that did not have electrical supply or adequate foundations to support the installations; and WHEREAS, the Mayor and City Commission, at its May 8, 2002 Commission meeting, adopted Resolution No. 2002-24848, which authorized the Property Management Director to serve as the Certified General Contractor for the Lincoln Road Lighting and Fountain Enhancement Project; and WHEREAS, the Property Management Director exercised the authority given to him by the City Manager and City Commission, and prepared a bid package that included required and sealed construction documents for the bid and permit requirements necessary for the installation of underground electrical conduits and the installation of structural concrete foundations required for the placement of the pole lights; and WHEREAS, three contractors that specialized in this work were contacted to provide quotes for the scope of work of which two provided bids for the project; and WHEREAS, the Property Management Director, after reviewing the bids, checking references, licensing, and insurance requirements determined that Branching Out, Inc. provided the lowest responsive responsible bid for the work; and WHEREAS, a contract with Branching Out, Inc. in the amount of $135,000, was prepared and form approved by the Legal Department, and executed by the Mayor and City Clerk for the installation of underground electrical conduits and the installation of structural concrete foundations required for the placement of the pole lights on Lincoln Road; and WHEREAS, as required by Resolution No. 2001-24677, the Administration herein requests that the Mayor and City Commission ratify the aforestated contract which is deemed necessary to continue the work on the Project. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby ratify a contract, in the amount of $135,000, to Branching Out, Inc. for the installation of underground electrical conduits and the installation of structural concrete foundations required for the placement of pole lights on Lincoln Road. PASSED and ADOPTED this 25th ,2003. ~y f~~ CITY CLERK APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION 111 ~-'3- tJ1 ~Ij CItY Date CITY OF MIAMI BEACH COMMISSION ITEM SUMMARY ~ Condensed Title: Ratification of a contract to Branching Out, Inc., in the amount of $135,000, for the installation of underground electrical conduits and the installation of structural concrete foundations for the placement of Pole LiQhts on Lincoln Road. Issue: Shall the City Commission ratify a contract, in the amount of $135,000, to Branching Out, Inc., for the installation of underground electrical conduits and the installation of structural concrete foundations for the olacement of Pole Liahts on Lincoln Road? Item Summary/Recommendation: In accordance with Resolution No. 2002-24848 adopted by the City Commission on May 8, 2002 the Administration, through its Property Management Director, is providing General Contracting services including bidding, the award of contracts for work, and change orders on the Lincoln Road Lighting and Fountain Enhancement Project. Under the provisions of the Resolution, contracts or purchases exceeding $25,000 must be brought to the City Commission for Ratification. In accordance with the Resolution, three companies that specialize in underground electrical installations and light pole foundation construction were contacted to provide quotes for the work. Of the three companies contacted, three submitted quotes. Branching Out, Inc., was determined to be the lowest responsive responsible contractor for the project. A contract was developed, form approved by the Legal Department on September 17, 2003 and executed by the Mayor and City Clerk as required. The Administration recommends that the Mayor and City Commission ratify the contract with Branching Out, Inc., for the installation of underground electrical conduits and the installation of structural concrete foundations for the placement of Pole Lights on Lincoln Road. The City has received some business owner/operator feedback that the lighting level provided by the newly installed pole lights maybe too bright; the City will complete a test block where all designed new lights will be installed followed by an evaluation by all concerned and then proceed with installation of the project lighting as designed or modified as reauired. Advisory Board Recommendation: IN/A Financial Information: Amount to be expended: Source of Amount Aec:;ount Approved Funds: 1 $135,000 # 365.2115.69358 D 2 3 4 Finance Dept. Total $135,000 # 365.2115.69358 City Clerk's Office Legislative Tracking: I ~~ " d .v~~'"~ I C7L / / -,) s:.o 3 '~lOOja..' AGENDA ITEM DATE CITY OF MIAMI BEACH CITY HALL 1700 CONVENTION CENTER DRIVE, MIAMI BEACH, FLORIDA 33139 http://ci.miami-beach.fJ.us COMMISSION MEMORANDUM TO: Mayor David Dermer and Members of the City Commission DATE: November 25,2003 FROM: Jorge M. Gonzalez ~ City Manager ~ C-- SUBJECT: A RESOLUTION OF THE MAYOR AN HE CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, RATIFYING A CONTRACT IN THE AMOUNT OF $135,000, TO BRANCHING OUT, INC., FOR THE INSTALLATION OF UNDERGROUND ELECTRICAL CONDUITS AND THE INSTALLATION OF STRUCTURAL CONCRETE FOUNDATIONS FOR THE PLACEMENT OF POLE LIGHTS ON LINCOLN ROAD. ADMINISTRATION RECOMMENDATION Approve the Resolution. ANALYSIS After lighting surveys were completed to assess need, the architectural programming and design of lighting enhancements on Lincoln Road included the installation of 60 pole mounted "Louis Poulsen" light fixtures along the length (400 - 1100 blocks) of Lincoln Road. The selection of this light fixture was approved by the Historic Preservation Board for use on Lincoln Road to match the lighting fixtures currently in place at the street ends. Because of the required placement locations as determined by the lighting surveys, electrical conduits and structural foundations were required to be installed to facilitate the pole light installations. The use of a directional boring technique was selected as the best method to minimize saw cutting of the existing walkways and to provide for the least disruption of the operation and activities of the merchants and visitors to Lincoln Road. The Mayor and City Commission, at the May 8, 2002 Commission meeting, adopted Resolution No. 2002-24848, which authorized the Property Management Director to serve as the Certified General Contractor for the Lincoln Road Lighting and Fountain Enhancement Project. The Property Management Director exercised the authority given to him by the City Manager and City Commission, and prepared a specification bid that reflected the needs and applicable code requirements for the installation of underground electrical conduits and the placement of concrete structural foundations to allow for the placement of pole lights on Lincoln Road. After completing the specifications, three firms that specialize in lighting foundation construction and directional boring to facilitate the installation of electrical conduits were contacted to provide quotes for the required work. Of the three firms that received bid packages, two submitted quotes for the project. After reviewing the quotes, and after checking background references, licensing and insurance requirements, and past work completed by this company on Lincoln Road, the Property Management Director determined that Branching Out, Inc., was the lowest responsive responsible bidder on the project. A contract was prepared with Branching Out, Inc., in the amount of $135,000, and was reviewed and form approved by the Legal Department on September 17, 2003. The contract was then signed by the contractor and executed by the Mayor and City Clerk as required. The Administration recommends that the Mayor and Members of the City Commission of The City of Miami Beach ratify the Property Management Director's contract to Branching Out, Inc., in the amount of $135,000 for the installation of underground electrical conduits and the installation of structural concrete foundations for the placement of pole light fixtures on Lincoln Road.. The City has received some business owner/operator feedback that the lighting level provided by the newly installed pole lights maybe too bright; the City will complete a test block where all designed new lights will be installed followed by an evaluation by all concerned and then proceed with installation of the project lighting as designed or modified as required. JMG/RCM/FB/BAJ T:\AGENDAI2003\nov2503\oonsenllUn<:oln Blanching Out Memo.DOC Z S! m... ~u OIU ...(3 Za:: lUll. :Ern IU... ~~ :I; ~~ a:: A. IU:E A.- 00 a::z A.i= %% ~~ m~ ~ :E ~ o 5 - r- ! .~ IU I :!i! I l! 0 2! 0 ~ 15 Z ...: <:) 0 C! 0 lO 0 Cl!. . 'I co '1 .... ~ ,!- . CO) u 8 a:: !... liu m OIU q~ i& ...1m r- 0 mz C! "0 0 0 i5~ !; C! ., lO .~ 0 .., I !;i::J g' ~ ...m co~ :c III :E::J l!! . za a:: ...I l! 0 m u Z ... i& :J u IU ., ~ A. m Z !i IU 0 ::IE i= IU A. ~ ii: u a:: f3 A. ~ E 0 <:) ::I Z m i= CI. % ~ 0 --I L I:J Lincoln Road Lighting and Fountain Enhancement Project Budget and Project Status Report As of 11-2003 This report serves as a status report on the Lincoln Road Lighting and Fountain Enhancement Project and outlines the funding sources for the project. Information is also provided on the current status and work accomplishments on the project. Fundina Date 3/6/2000 5/29/2002 5/29/2002 Source General Obligation Bond Save Americas' Treasures Grant Redevelopment Agency Expenditures Architectural/Engineering South Dade Electric, Inc. 60 Light Poles Veazey Group, Inc. 160 Stanchion Tree Lights Mercedes Electric Supply, Inc. Electrical Materials & Supplies Branching Out, Inc. Light Pole Installation Legacy Pools, Inc. Demolition & Replace Fountains Veazey Group, Inc. 165 Tree uplights Mobile Storage Group Job site container Rental Able Sanitation, Inc. Portable Restroom Rental Property Management Staff Costs Amount 200,000 135,000 608,636 Total Funding: $ 943,636 112,000 86,518 45,600 40,000 135,000 105,000 50,775 1,500 1,000 64,123 Total Expenditures: $ 641,516 Project Balance: $ 302,120 Project Schedule Although some significant delays were experienced due to design review revisions, the project is currently under approved building permits and proceeding as planned. Due to the onset of the South Florida tourist season and major public events scheduled in the South Beach and surrounding areas, a shutdown of the project is anticipated to take place in mid November and continue through January 2003. The projected completion date for the project is May 2004. Property Mgt. Division Public Works November 2003