Resolution 2021-31672 RESOLUTION NO. 2021-31672 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ACCEPTING THE RECOMMENDATION OF THE FINANCE AND ECONOMIC RESILIENCY COMMITTEE AT ITS MARCH 26, 2021 MEETING, TO PROVIDE ADDITIONAL FUNDING, FROM THE CITY'S RESILIENCY FUND, FOR THE BAYSHORE PARK(FORMER PAR 3) PROJECT UTILITY RELOCATION, IN AN ESTIMATED AMOUNT OF $3.5 MILLION. WHEREAS, on April 30, 2014, the Mayor and City Commission approved, via Resolution No. 2014-28584, changing the use and designation of a portion of the Par 3 Golf Course, to accommodate greenery and open space adjacent to the Scott Rakow Youth Center; and WHEREAS, on March 11, 2015, City Commission accepted the recommendation of the Neighborhoods/Community Affairs Committee to authorize the Administration to utilize the conceptual park plan with open recreational play areas prepared by the Planning Department as a basis to prepare a Request for Qualifications(RFQ)for final design; and WHEREAS, on May 19, 2016, the City executed an agreement with Savino Miller Design Studio for the Landscaping, Architectural, and Engineering Design Services for the Bayshore Park Project; and WHEREAS, Bayshore Park, located at 2300 Pine Tree Drive, will include 19 beautiful acres of public recreation space, and the park will boast several marquee features such as an outdoor amphitheater, an iconic water fountain, a children's playground, and tennis courts; and WHEREAS, the current total project budget is approximately$21.1 Million, including$15.7 million from the General Obligation Bond Program, including project design costs, and contingency; and WHEREAS, although the project will greatly enhance the Bayshore Park neighborhood, many of the park's key elements are in conflict with the existing underground utilities; and WHEREAS, the current construction budget for the Bayshore Park Project is $15M, and the project has experienced protracted delays and additional costs related to the Miami-Dade County Department of Environmental Resources Management(DERM) permitting of the planned soil mitigation; and WHEREAS, in an attempt to mitigate the additional costs, the Bayshore Park Project is currently being value engineered; however, during the design phase it became apparent that conflicts with the underground utilities would need to be resolved during construction; and WHEREAS, the relocation of underground utilities was not accounted for in the current budget; and WHEREAS, the Administration recommends proceeding with the replacement and relocation of the pipelines to avoid additional potential costs to the City if these pipes were to fail during or after the construction of the planned new park facilities; and Page 280 of 2709 WHEREAS, replacing these pipelines now would avoid further impact to the park at a future date and avoid undue risks associated with their replacement after the new conflicts are constructed; and WHEREAS, in an effort to keep costs at a minimum the utilities will be relocated within the park and protected with encasements or carrier pipes to mitigate conflicts; however, the construction costs will be burdened by the contaminated soils in the area that require proper disposal; and WHEREAS, the total cost of the relocation of the two pipelines is estimated at $3.5M; however, this is a planning level estimate that can vary widely after the utility relocation is further defined, and the Administration recommends funding these necessary utility relocations from the Resiliency Fund; and WHEREAS, a request for additional funds was presented at the February 19, 2021 Finance and Economic Resiliency Committee (FERC), which discussion continued to its March 26, 2021 meeting; and WHEREAS, at the March 26, 2021 FERC meeting, the Committee members concurred and supported utilizing the Resiliency Funds in order to proceed with the Par 3 Project relocation, and the Committee favorably recommended the item for approval by the City Commission. NOW, THEREFORE, BE IT DULY RESOLVED THAT THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby accept the recommendation of the Finance and Economic Resiliency Committee at its March 26, 2021 meeting,to provide additional funding,from the City's Resiliency Fund,for the Bayshore Park(Former Par 3)Project Utility Relocation, in an estimated amount of $3.5 Million. PASSED and ADOPTED this a9 day of npril, 2021. ATTEST: Dan Gelber, Mayor 721 Rafael E. Granado, tyClerk APPROVED AS TO FORM& LANGUAGE nj,8,q8, & FOR EXECUTION HCOR° ORATED? �. Mame! -- --- ;,� ��� ,��' � ll Mme!Y Osie ,I CH 20,,.x, 2 Page 281 of 2709 Resolutions -C7 N MIAMI BEACH COMMISSION MEMORANDUM TO: Honorable Mayor and Members of the City Commission FROM: Raul J.Aguila, Interim City Manager DATE: April 29, 2021 SUBJECT:A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ACCEPTING THE RECOMMENDATION OF THE FINANCE AND ECONOMIC RESILIENCY COMMITTEE AT ITS MARCH 26, 2021 MEETING, TO PROVIDE ADDITIONAL FUNDING, FROM THE CITY'S RESILIENCY FUND, FOR THE BAYSHORE PARK (FORMER PAR 3) PROJECT UTILITY RELOCATION, IN AN ESTIMATED AMOUNT OF $3.5 MILLION. RECOMMENDATION The Administration recommends approving the Resolution. BACKGROUND/HISTORY On April 30, 2014, the Mayor and City Commission approved, via Resolution No. 2014-28584, changing the use and designation of a portion of the Par 3 Golf Course, to accommodate greenery and open space adjacent to the Scott Rakow Youth Center. On March 11, 2015, City Commission accepted the recommendation of the Neighborhoods/Community Affairs Committee to authorize the Administration to utilize the conceptual park plan with open recreational play areas prepared by the Planning Department as a basis to prepare a Request for Qualifications (RFQ)for final design. On May 19, 2016 the City executed an agreement with Savino Miller Design Studio for the Landscaping,Architectural, and Engineering Design Services for the Bayshore Park Project. Bayshore Park, located at 2300 Pine Tree Drive, will include 19 beautiful acres of public recreation space. The park will boast several marquee features such as an outdoor amphitheater, an iconic water fountain, a children's playground, and tennis courts. The current total project budget is approximately $21.1 Million, including $15.7 Million from the General Obligation Bond Program, project design, and contingency. Although the project will greatly enhance the Bayshore Park neighborhood, it will also create conflicts between many of the parrs key elements and the existing underground utilities. The current construction budget is $15M. The project has experienced protracted delays related to the Miami-Dade County Department of Environmental Resources Management ( Page 262 of 538 DERM)permitting of the planned soil mitigation. Consequently, cost overruns are expected. In an attempt to mitigate the overruns, the project is currently being value engineered. However, during the design phase it became apparent that conflicts with the underground utilities would need to be resolved during construction. The relocation of the underground utilities was not accounted for in the current budget. In general, Master Plans are high-level planning tools, and therefore do not consider project specific details, such as the planned park renovations when programming the replacement or relocation of utilities within Bayshore Park. In order to complete the project and protect the existing utilities, additional funding will need to be identified and approved. An option contemplated by the Administration was utilizing Resiliency Funds, currently with an available budget of$34.5 Million. A request for additional funds was presented at the February 19, 2021 Finance and Economic Resiliency Committee (FERC), which discussion continued to its March 26, 2021 meeting. At the March 26, 2021 FERC meeting, the Committee members concurred and supported utilizing the Resiliency Funds in order to proceed with the Par 3 Project relocation. A motion was made to move the item to the full City Commission for approval. ANALYSIS Currently,there are two existing pipelines under the park. The 20-inch water main serves the two ground storage tanks at the 25th Street Water Booster Station. These ground storage tanks support essential life safety services during emergencies. In the event of a failure, the City would be out of compliance with the required regulatory minimum storage, pursuant to FAC 62- 555.320(19). The 30-inch sewer force main is one of only two major transmission lines serving the entirety of Mid-Beach and North Beach, as well as our three volume sewer customers (Village of Bal Harbour, Town of Bay Harbor, and Town of Surfside). Without this sewer force main online, the City would not be able to sustain sewer operations, as our system is not designed to accommodate swinging flows between the two transmission lines. Attachment A illustrates the location of the water main and force main with respect to the planned new park facilities. The City of Miami Beach has a 25-year plan to update aging water and wastewater infrastructure, much of which has not been replaced since the City was initially developed. The Five-Year Critical Needs Capital Plan, which includes the most critical components of the system, was estimated to cost approximately $122.2 M. The City Commission has approved the implementation of the first Five-Year Critical Needs Capital Plan and funding sources have been identified; $72M are funds available to the City from utility revenues, or previous bond issuances, and the remaining $50.2 Million will be funded through the issuance of new bonds. The water and force main along Par 3 are not part of the first Five-Year Critical Needs Capital Plan projects that have been funded and approved however they do form part of the 25-year infrastructure upgrade plan. Beyond the utility conflicts, the pipelines are over 50 years old and due for replacement. The 2019 Water System Master Plan determined that portions of the 20- inch water main had a high probability of failure, due to the age of the pipe. It recommended replacement of the pipe in 2033-2036, subsequent to the implementation of higher priority water system projects. Page 263 of 538 SUPPORTING SURVEY DATA Results from the 2019 Resident Survey show that 50% of residents rated efforts to manage stormwater drainage and flooding as excellent or good. In order to continue maintaining excellent standards in this area, the Administration recommends approving additional funding for the Bayshore Park(former Par 3) Project relocation. CONCLUSION The Administration recommends proceeding with the replacement and relocation of the pipelines to avoid additional potential costs to the City if these pipes were to fail during or after the construction of the planned new park facilities. Perhaps more importantly, replacing these pipelines now would avoid further impact to the park at a future date and avoid undue risks associated with their replacement after the new conflicts are constructed. In an effort to keep costs at a minimum the utilities will be relocated within the park and protected with encasements or carrier pipes to mitigate conflicts. However, the construction costs will be burdened by the contaminated soils in the area that require proper disposal. The total cost of the relocation of the two pipelines is estimated at $3.5M. This is a planning level estimate that can vary widely after the utility relocation is further defined. The Administration recommends funding these necessary utility relocations from the Resiliency Fund. Applicable Area South Beach • Is this a"Residents Right Does this item utilize G.O. to Know" item,pursuant to Bond Funds? City Code Section 2-14? Yes Yes Legislative Tracking Public Works ATTACHMENTS: Description ❑ Bayshore Park Site Plan-Existing Pipeline Conflicts-20210216 ❑ Resolution Page 264 of 538 k.f r i/ r I , � � `s•_;,2112.-•:--- -----------:----;---,-----.0 ,/ /� • • '-1 / ` -•'P`ls'" /.;��.•,r 'Ir, f1 .•.l ,,,Y G f-•c vRLAGGWn .. _410:.flY1i0W1[o— J,�� - _ p/p) --•,f• ari.Ti •GGA. GU �,�y.R1 Y' - ( "•'• , . V �' 4eJ;'w SCOTT RAKOW ... 5 /' ' UTH CENTER � I` 1611 •��JJ �vj��'I' ii 's.1..r. '1 - �.. eY = •`' `� � `��,•� 'Ir __ - ---- 'wA - "-._.... .._ r1.- _%• a .,.... �i rj. \ tt. I� :--- -- �v-. .--- - SwW5 ��t 1 f / /'A • -:(<«In, OPEMPLAY ' #'r'•. ./..- i� s�' r ''.I' s. ,fi,I _. wG`i .7:,..:::.,.;."-.1_,..... . 1 .._ ���1• MEADOW O E_`�j . • i.: Y . • • '! _"�• ��/ 1 f T,_ rte 9♦� _ �ppy!W- , l j �` • • ! •"-" f, . - - :_. J' ' "4'4746,0191'.r---':- �, 'Jysf r 4/g1 1 O VO° �: )... / - I Nn.,Ao.._,u1•nN � l 1,'-' pX71 �__...,4!50 \ N \00� y ., '// _r / I r i I •,.���,u :I // - � .--1 t II / , "" '///` / JOGGING MAINTENANCE`4+•%' -{` ; I.La _ ti ii ! // ♦ '/ I ,/$�6---.•,—'1,,•,„. �ry/ EMERG CY ACCESS eA7Y1� ') — - _ al 'I /f � pi lrrl [�/ { `��• 0.4,; p%i . 4.1Ai ®_ l 4rr;,l _purr xrr 7•'F l. `� ,; I I MI NSE .. 'r P, q f` •••±0r-Q 1 r I j 7 Iii '7 :/r/ �``if���G - [�'� ( al 'I� lgi� ry�` !f r`` w.w... .. +I r(f 1 ✓! ISLAND ';. 2 i i �. i`til o` ' Ir\4 ^ `" ` _ 11►d . I OPEN PLAY `=� 4' • °' `1 ��L . 's FT,n.f., '' �1 - f i' 1, �+i,I'h1r ..�.'fl1 MEADOW ,,, �KE�\ LAKE \ l''••'' •_� \ l�� 4 ;) -_..CeP Y '- R ild — —.. — a 11 ,. I-' A r I 11 i .- �``' ..1 1 moo.u."uM m, y {• I•' f•)4" rP �f lhr„.,- . 6t'tft (_ St '...‘4.-- ��\ S 1 r1 ;' r pI 11 II;i IY l �,, . Lµ Ia ,-.4,6--,--_-.-.-:,.:=-,--,„,...,,,-wF.] _G•'-•,_•,.- --,_,--1-.z.....---. , ` .,.PI7 - \. V f ;1 MI"pH ) •14 nnv w� III 1,,11.i1 I (61' • �,•'�---!illff. _ — �V . ,� ' I1 1i• -- ..wrwnl I. �11�1 1I 'II I1{{L,`'(rII'� _ ���° r. 20. ,��\t�.,SC r (fe ' WA ER ,. / _ �-'ir. €dIW1-!. : Mrouam,ousw:n , N�1 I✓• d !• l ' �- FEATURE C IN - - ---- I) . PY ! ' 111 / / \ ` IIS 1.� , 1 J r`` a\ wil r i \�� ri �\\��, - SII w: q / ai Iii'i) t/� t' ::-.-----3 \" OP @Q-dO,ylf - -����Il '%%.,y. - , t (,� )��a� 9 ei �Ai �W..rw...u,. s, ,o„rs 11 F♦� { d.(`���1(,4f_.x...5_:...;„_ ___ } - :, .,P<+,iMEAROW • JgjO � _.` �\.. y7''f' 'f lY _ t 4* N r e I . I^fid•�/�/6 � -0 + `�-� A 1� --,�• J'�-`�, �� -✓4` r` �Il "41'01'4 fill-: 4, 11..1 II d y ' S 1 �/ . _\ ►1? 1'R,• r r' I _ , : .11 I 6' .....- --/y, 1‘,..7....14$,,,1„.°ik. *----..„...-Ne.:-.,......„,,,�`-.t�� _._ / kc4Z,. �, I! Yi aaa' I a't t CHL (n S.$ i I 19 1 j•tu• f` A : .� Ai ' pji J 4 1�: ii I� •1 `' �`4l. ''I iIII a1 __• --,--7.t_-,-_* l`,� qr/ r 1r1"1"1:641414 .. _ 1 1 \ 1 �`1 S`�-�'?:, 1 ` a . � � : : �� r }moi I 1 , ' / 1lib‘ .‘40.4...'= : .. ..r t ; ;i I I 'I 1 _ • (.X, ,.;1 �;�5 '�lia' I��C%� I GP - PARKING,••�� ..�.Ql' r .. ����. � '•.'fl �''.' 1'� i • n it1 �1 ft 777 •.•• A__ ill I' ��..� TENNI FACILITY a '�F ' I 1' I i-iy '�I/I I �� I '01S '.., __J `ki-'I ter,I_6qsAI�• i'l p I WITH R STROOMS. ��'� �T-�,_.._h \ • �1 lt.M2 t_ -,j5. - --• •!'I\—• I 1 SEEARCHONJO °l .�14111 14 • —4-- I�— . I i 4. �� --'\\GG 777111 I • - I SHADRC'PAYR10.1 -` • -' II N,f,r MATCHLINE-SEE PLAN ON THIS TI T ,_..i c ` Vil r 1 r — '— ;Y I MIAMI BEACH I w_ � ` 1 I ( 1.If ----'- -- ' ...`� �. — X''J HIGH SCHOOL I f $ p i • 4 1 IS FACILITY c` �y�'' Ir N NIRESTRODMS, _'� • i_�T'II/at __ yF" y1 ti r SEEARCHDWGS V,1j, illiISI,l-J'ni i I 1EB.- C�SDEMY-._--/ Y Ii' } I' /L••-, I '�/-.11. l 7r 121 i + f,_I + I SHAOT�PAVlUON � 'IIV11 I k," f� 1 I r y ...1._-_. • PROECT: BAYSHORE PARK(FORMER PAR 3) uor REED. _BM_ AROCIECT ram Ram NAROSCAPE PUN SREET54.9 : /'• ' ;:',':'";....f':'. -"' 2300 PINE TREE DRIVE cm.wwOER JUMP R«w.Es OEBCN u to savInan,Iller Cm llal.oR wwuwrwE;PE ERWPI Etr S.D. T : : CAPITAL IMPROVEMENT PROJECTS OFFICE N'�' •_ •__ - 11-1am PERMIT GET-REVsnN1 E.n.r R.fNwo •oswOwn......Ri.,WILKftran OVERALL SITE PLAN .•_ rn = Plofrsr.uworn:Mo+As.Mw.PE �'E E" ' +.x+ "ET+NrtaET FAO Mak KA P.o.�p w..O.w m1uv:N - —•,_ sc..,,.. s+ma NOM'N�• MO ME BEMIS. PPM,BY a.. Snow 0...9 I A-01