Amendment No.49 to Agreement with Fentress Architects 019— 2sc53$ zc9 ) i - Zg9ZS AMENDMENT NO.49 TO THE AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND FENTRESS ARCHITECTS, DATED MAY 14, 2014, FOR DESIGN CRITERIA PROFESSIONAL SERVICES FOR THE MIAMI BEACH CONVENTION CENTER RENOVATION PROJECT This Amendment No. 49 to the Agreement made and entered this 21 day of .3 , 2021, by and between the CITY OF MIAMI BEACH,a municipal corporation existing under the laws of the State of Florida (hereinafter referred to as City), having its principal offices at 170.0 Convention Center Drive, Miami Beach, Florida 33139,and FENTRESS ARCHITECTS,a Colorado corporation, having its offices at 421 Broadway, Denver, Colorado(hereinafter referred to as"Consultant"or"Architect-Engineer"). RECITALS WHEREAS, pursuant to Request for Qualifications (RFQ) No. 2014-142ME. the Mayor and City Commission adopted Resolution No. 2014-28538 on April 9, 2014, approving and authorizing the Mayor and City Clerk to execute an Agreement with Fentress Architects for Design Criteria Professional Services for the Miami Beach Convention Center Renovation Project(the"Agreement"); and WHEREAS, the Agreement was executed for a lump sum amount of S10,967,200 including reimbursable expenses; and WHEREAS, on December 8, 2014, Amendment No. 1 was executed for correction to Task 3 — Design Development and Design Criteria Package Services, requiring 30%completion level for low voltage systems in lieu of 90%completion;and WHEREAS, on December 8, 2014, Amendment No. 2 was executed for supplemental civil engineering services in the amount of$41,079; and WHEREAS, on December 8, 2014, Amendment No. 3 was executed for additional services to revise the quantity, sizes and configurations of the main ballroom,junior ballrooms, and meeting rooms, in the amount of$179,982; and WHEREAS,on January 21,2015,Amendment No.4 was executed for a regional stormwater pump station location analysis, and for the development of a 3D animation and custom website for the Project in the amount of$76,605; and WHEREAS, on February 11, 2015, the City Commission authorized Resolution No. 2015-28925, authorizing an additional lump sum amount of $14,469,500, for the purpose of retaining Fentress to complete all design and construction administration services for the Project;arid WHEREAS, on March 31, 2015, Amendment No. 5 was executed for the completion of design development documents and preparation of Bid Package 1, in the amount of$2,442,400(part of Resolution No.2015-28925); and WHEREAS, on May 28, 2015, Amendment No. 6 was executed for a deductive adjustment to the Agreement in the total amount of$3,129,259, to delete the remaining Tasks 4, 5 and 6 of the Scope of Services set forth in Schedule A of the Agreement, as such tasks are no longer applicable and shall be superseded by a subsequent amendment with regard to the construction documentation and administration services required for the Project(part of Resolution No.2015-28925); and WHEREAS, on May 28, 2015, Amendment No. 7 was executed for Additional Services relating to wind loading and micro-climate services, in the amount of$117,200; • 1 WHEREAS, on May 28, 2015, Amendment No. 8 was executed to retain Fentress Architects to serve as Architect of Record for the Project, to clarify requirements with regard to Design Development, and to provide for completion of Construction Documents and all construction administration services required of the Architect-Engineer for the Project,in the total amount of$15,156,359(part of Resolution No. 2015-28925);and WHEREAS, on August 14, 2015,. Amendment No. 9 was executed for the provision of Commissioning Services, in the total amount of$302,876; and WHEREAS, on October 27, 2015,Amendment No. 10 was executed for a parapet design analysis and consultation services to reduce the applicable wind pressures on the curtain wall for potential construction cost reductions, in the amount of$15,000; and WHEREAS, on December 4. 2015,Amendment No. 11 was executed for the preparation of event plans background drawings to be used by event planners during construction, in the amount of$36,875; and WHEREAS,on March 29,2016,Amendment No. 12 was executed for stormwater design revisions related to Public Works Department's pump stations design, in the amount of$34,073; and WHEREAS, on May 31, 2016, Amendment No. 13 was executed for design changes associated with the removal of the smoke control system, in the amount of$173,790; and WHEREAS, on June 10, 2016, Amendment No. 14 was executed for additional site visits by members of the design team for a weekly presence through July 28, 2016, and for the implementation of alternative designs requested by the Construction Manager, in the amount of$148,999; and WHEREAS, on July 18, 2016, Amendment No. 15 was executed for design changes associated with raising 18th Street, 19t" Street and Convention Center Drive, requested by Public Works to allow the raising of Meridian Avenue and 17th Street in the future, in the amount of$111,338;and WHEREAS, on August 26, 2016 Amendment No. 16 was executed for the addition of a 72" storm culvert to serve as a temporary bypass until the new culvert on 17th Street is completed by Public Works; and for the redesign of Convention Center Drive between 17"'and 18th Streets due to the postponement of the Convention Center Hotel Project, in the amount of$70,270;and WHEREAS, on September 7, 2016,Amendment No. 17 was executed for GMP cost reconciliation services beyond what was originally contemplated in the basic construction administration services, in the amount of$49,360; and WHEREAS, on September 7, 2016, Amendment No. 18 was executed for additional site visits by members of the design team for a weekly presence through approximately September 30, 2016, and for the implementation of alternative designs requested by the Construction Manager, in the amount of $112.649; and WHEREAS,on October 24,2016.Amendment No. 19 was executed for design changes associated with retaining the east half of the existing exhibit hall bridge to provide more flexibility in egress travel distances of show layouts, in the amount of 220,291; and WHEREAS, on November 16, 2016, Amendment No. 20 was executed for additional reviews of steel submittals and for revisions of levels two and five truss loading for temporary conditions for Art Basel 2016; this Amendment is to be funded from a deductive change order to the Agreement with Clark Construction, in the amount of$96,710; and WHEREAS, on December 20, 2016, Amendment No. 21 was executed for additional design services associated with the incorporation of additional security cameras, revisions to vaults requested by FPL, additional structural engineering resulting from unforeseen site conditions(RFIs),construction details for the temporary transition slab required for Art Basel 2016, and renovation of the east kitchen not included in the original scope of work, in the amount of$80,330;and 2 WHEREAS, on December 20, 2016, Amendment No. 22 was executed for revisions to the construction documents as needed for artwork installations by Sarah Mods, Franz Ackermann and Ellen Harvey,selected as part of the Art in Public Places Program, in the amount of$17,121;and WHEREAS, on December 20, 2016, Amendment No. 23 was executed for additional structural engineering services due to non-conformances by Clark Construction, in the amount of$10,000;and WHEREAS, on January 18, 2017, Amendment No. 24 was executed for additional design, permitting and construction administration services related to a new sanitary sewer lateral for the Carl Fisher Clubhouse, in the amount of$18,625;and WHEREAS, on May 5, 2017, Amendment No. 25 was executed for revisions to the signage package, in the amount of$12,030; and WHEREAS,on May 5, 2017,Amendment No.26 was executed for additional reviews of structural submittals and for design revisions associated with non-conforming field conditions, funded from a deductive change order to the Agreement with Clark Construction,in the amount of$15,580; and WHEREAS, on May 5, 2017,Amendment No.27 was executed for design services to incorporate a new vertical circulation connection between the north side of the Exhibit Hall D and the Grand Ballroom on Level 2, in the amount of 124,240,as approved by the City Commission on April 26,2017(Agenda Item R71);and WHEREAS, on June 30,2017,Amendment No. 28 was executed for design revisions associated with the relocation of the 19"'Street pump station, in the amount of$2,585;and WHEREAS, on August 15, 2017, Amendment No. 29 was executed for design solutions for contractor-requested items related to closing non-conforming conditions related to RFI 3251, and for additional reviews of structural submittals, funded from a deductive change order to the Agreement with Clark Construction, in the amount of S30,875;and WHEREAS, on August 18, 2017, Amendment No. 30 was executed for additional services associated with revisions to the P-Lot Park design,as approved by the City Commission on July 26,2017, in the amount of 349,076;and WHEREAS, on September 18, 2017, Amendment No. 31 was executed for revisions to the construction documents as needed for artwork installations by Joseph Kosuth, selected as part of the Art in Public Places Program,in the amount of$14,570;and WHEREAS, on September 18, 2017, Amendment No. 32 was executed for revisions to the construction documents approved in Amendment No.27,to accommodate the construction that progressed during the delayed issuance of the package due to extended negotiations with Art Basel, in the amount of $11,430;and WHEREAS, on September 19, 2017, Amendment No. 33 was executed for drainage revisions associated with keeping the existing culvert that crosses the P-Lot in lieu of removal,as requested by Public Works,due to the postponement of the 170'Street drainage improvements, in the amount of$11,985, and for revisions to the southwest corner rendering in the amount of$1,350; and WHEREAS, on December 15, 2015, Amendment No. 34 was executed for additional reviews of structural submittals, and for design solutions for contractor-requested items related to closing non- conforming conditions, in the amount of $50,785, to be funded from a deductive change order to the Agreement with Clark Construction; and WHEREAS, on December 15, 2017, Amendment No. 35 was executed for design revisions to the 21st Street Park as a result of the pump station installation and changes required for AIPP installations in the amount of$43,788, and for design solutions for the repair to the existing culvert which collapsed during installation of the new culvert, in the amount of$4,840; and 3 WHEREAS,August 6, 2018,Amendment No.36 was executed for 19'"Street revisions as a result of pump station relocation,and additional construction administration services through November 30,2018. in the amount of$136,408; and WHEREAS,on September 21,2018,Amendment No. 37 was executed for design revisions to 215' Street Park associated with retaining existing mahoganies and de-scoping sitework around Carl Fisher Clubhouse and Pump Station;reconciliation of relocated trees and associated design revisions to Park; and 19'"Street revisions as a result of the Holocaust Memorial's request to keep the existing stone cladded knee wall; in the amount of$50,320; and WHEREAS, on September 25, 2018, Amendment No. 38 was executed for the development of a stand-alone package for the P-Lot Park for a separate permit, structural footing design for events tent structures, and additional services for re-bidding and construction administration of the park, in the amount of$261,445; and WHEREAS, on January 9, 2019 Amendment No. 39 was executed for the analysis, design and documentation to reinforce the existing structure to withstand additional cooling tower loads (NCR 3363 and RFI 3691), an updated site plan rendering, and extended construction administration services for the building, in the amount of$206,510; and WHEREAS,on February 28,2019,Amendment No.40 was executed for additionaldesign services required to redesign the routing of the Florida Power and Light (FP&L) ductbank for P-Lot Park, in the amount of$5,328; and WHEREAS,on February 28,2019,Amendment No.41 was executed for additional design services related to revised pavement striping at 18'f' Street as requested by Transportation Department, and electrical revisions at 215'Street Park, in the amount of$7,125;and WHEREAS, on March 29, 2019, Amendment No. 42 was executed for extended Construction Administration Services through August 31, 2019, in the amount of S263,250;and WHEREAS, on May 22,2019,Amendment No.43 was executed for the incorporation of Requests for Information (RFI's)into the contract documents, required for permit revision, in the amount of$45,180; and WHEREAS,on September 10, 2019,Amendment No.44 was executed for extended Construction Administration Services through January 31, 2020, in the amount of 120,450; and WHEREAS, on January 13, 2020, Amendment No. 45 was executed for letters from Structural Engineer required for Special Events Permits through Antique Show of January 2020, additional services for Life Safety Consultant related to fire alarm changes, evaluation of electrical equipment in room 1.29.35 due to water leak, and additional services for Structural Engineer for review of conduit installation in the fifth floor topping slab;and WHEREAS, on March 23, 2020, Amendment No. 46 was executed for additional construction administration services for the building through June 30, 2020, additional forty(40) letters from Structural Engineer required for Special Events Permits through July 2020, structural engineer evaluation of damage to an escalator support column caused during load-in/load-out of a show requested by the Building Official; and WHEREAS, on March 31, 2020, Amendment No. 47 was executed for additional construction administration services for P-Lot Park. WHEREAS, on October 22, 2020, Amendment No. 48 was executed for additional construction administration services for P-Lot Park through December 2020, additional services related to the design of the exercise area at P-Lot Park, door bracing engineering required for CO, Life Safety Evaluation Report, and credit for unused reimbursables/expenses in Amendments 30 &38. 4 WHEREAS,this Amendment No.49 is for additional services related to the Class II Permit renewal and modification required to close-out the project, which have extended beyond the construction administration services contract for the Civil Engineering Firm, and for a credit for unused services related to Amendments 9, 10, 16, 17, 39,45 and 46, resulting in a credit to the City in the amount of(528,195). NOW, THEREFORE,the parties hereto, and in consideration of the mutual promises, covenants, agreements, terms, and conditions herein contained, and other good and valuable consideration, the respect and adequacy are hereby acknowledged, do agree as follows: 1. ABOVE RECITALS. The above recitals are true and correct and are incorporated as a part of this Amendment No,49. 2. MODIFICATIONS. The Agreement is amended as provided in Appendix"A-49", attached herein. 3. OTHER PROVISIONS. All other provisions of the Agreement, as amended, are unchanged and in full force and effect. 4. RATIFICATION. The City and Consultant ratify the terms of the Agreement,as amended by this Amendment No.49. IN WITNESS WHEREOF, the parties hereto have caused this Amendment No.49 to be executed in their names by their duly authorized officials as of the date first set forth above. ATTEST: CITY OF MIAMI BEACH ' (�- Rafael Gra aLLIA__/ ,f� T. Hudak City Clerk City Manager ATT T: / CON T: S RCHITEE ?" _ -a,. ignature: Signature e of C!!•rn C trs �• �sS, '�.�d �c Print Name/Title Print Name/Title .IP!P ORATED` APPROVED AS TO FORM& LANGUAGE ,,, ..Zen �_ 8 FOR EXECUTION alt � �3`0 /! : bbi7 �1 City Attomer -,C ' Dfte 5 Appendix"A-49" 1. SCOPE OF SERVICES a. Class II permit renewal/modification: Refer to attached proposal dated June 8, 2021. 2. PAYMENT AND COMPENSATION Kimley Horn Amendment for Class II Permit(hourly,not-to-exceed) $ 16,235.00 1 !Unused Amounts in Prior Amendments Budget Spent Balance !Amend 9-Commissioning for Pavillion $ 22,776.00 $ 6,839.55 $ 15,936.45 Amend 10-Wind Consultation $ 5,000.00 $ 4,675.00 $ 325.00 Amend 16-Temporary Box Culvert $ 45,525.00 $ 40,600.25 $ 4,924.75 Amend 17-GMP Reconciliation T&M $ 49,360.00 $ 33,602.50 $ 15,757.50 Amend 39- NCR 3363-Site Visits Wallace $ 3,000.00 $ - $ 3,000.00 Amend 45- Electrical Equipment Evaluation (ME) $ 2,000.00 $ 862.45 rt$ 1,137.55 Amend 46-Structural Special Event Letters $ 7,050.00 $ 3,701.25 $ 3,348.75 Credit $ 44,430.00 Amendment 39 Total Amount(CREDIT) $(28,195.00) 6 AGREEMENT TOTAL Project Contingency Added Scope Total Original Agreement $ 10,967,200 $1,096,720 $12,063,920 Amendment-Reso 2015-28925 (5,6&8) Amendment 5 $ 2,442,400 $ 2,442,400 Amendment 6 $ (3,129,259) $ (3,129,259 Amendment 8 $ 15,156,359 $15,156,359 Contingency reduction $ (96,720) $ (96,720 Total $25,436,700 $1,000,000 $26,436,700 Amendment 2-Civil $ 41,079 Amendment 3-Ballrm change $ 179,982 Amendment 4-Stormwater/website $ 76,605 Amendment 7-Wind study/roof survey $ 117,200 Amendment 9-Commissioning $ 302,876 Amendment 10-Parapet Analysis $ 15,000 Amendment 11-Event Plans $ 36,875 Amendment 12-Stormwater Revisions $ 34,073 Amendment 13-Smoke Control Removal $ 173,790 Amendment 14-Site Visits&Alternative Design $ - $ 148,999 Amendment 15-Streets Regrading $ 22,520 $ 88,818 Amendment 16-Culvert and Cony Ctr Dr redesign $ 70,270 Amendment 17-GMP Reconciliation-add'I $ 49,360 Amendment 18-Additional Site Visits $ 112,649 Amendment 19-East Bridge Retention $ 220,291 Amendment 20-Steel submittals and Truss loading analysis $ 96,710 Amendment 21-Cameras,vaults,RFIs,kitchen,transition slab $ 80,330 Amendment 22-AIPP(Morris,Ackermann&Harvey) $ 17,121 Amendment 23-NCRs* $ 10,000 Amendment 24-Sanitary Sewer Lateral -Carl Fisher Clubhouse $ 18,625 Amendment 25-Signage Package Revisions $ 12,030 Amendment 26-Structural submittals&NCRs $ 15,580 Amendment 27-Exhibit hall/Ballroom Vertical Circulation $ 124,240 Amendment 28-19th Street Pump Station Relocation $ 2,585 Amendment 29-RFI 3251&Structural Submittals $ 30,875 Amendment 30-P-Lot Park Revision $ 349,076 Amendment 31-AIPP(Joseph Kosuth) $ 14,570 Amendment 32-Exhibit Hall/Ballroom Vertical Circulation rev $ 11,430 Amendment 33-Plot culvert and rendering $ 13,335 Amendment 34-Structural Submittals&/NCRs $ 50,785 Amendment 35-21st St Park Rev&Culvert repair $ 48,628 Amendment 36-19th St and CA Services $ 136,408 Amendment 37-21st Park,Tree Reconc,19th St $ 50,320 Amendment 38-Plot Park Repackaging and CA services $ 261,445 Amendment 39-Rendering,NCR 3363,Add'I CA Services Bldg $ 206,510 Amendment 40-Plot Park-FPL Ductbank $ 5,328 Amendment 41-18th St pavement marking and 21st elec $ 7,125 Amendment 42-Extended CA and RFIs review $ 263,250 Amendment 43-Incorporation of RFIs into Contract Documents $ 45,180 Amendment 44-Extended CA $ 120,450 Amendment 45-Event letters,LS Consultant,Struct Eng,Electrical equipment eval. $ 44,325 Amendment 46-Extended CA,Event Letters,Structural Eng Eval damaged column $ 129,750 Amendment 47-Extended CA for P-Lot Park(Pride Park) $ 42,035 Amendment 48-Plot Park CA,exercise equip&credit for reimb;Bldg Life Safety Report;Door bracing $ 114,504 Amendment 49-Class II Renewal and Credit for unused amounts in prior Amendments $ (28,195) Total $25,436,700 $1,000,000 $2,984,742 $29,421,442 1. Amendments 14, 18,20,23,26,29 and 34 totaling$465,598,funded from Clark's contract via deductive change orders. 2. Amendments 22&31 totaling$31,691 funded from AIPP fund. 7 FENTRESS ARCHITECTS fentressarchitects.com May 28,2021 Revised June 8,2021 Mr.Alina T. Hudak,City Manager City Manager's Office City of Miami Beach 1700 Convention Center Drive 4th Floor Miami Beach, FL 33139 Re: Miami Beach Convention Center Renovation Resolution No.2014-28538 Proposal 88—DRER Class II Permit Renewal Project 20140021.001 A82 Dear Mr. Morales: This proposal is to provide design services for the renewal of the DRER Class II permit. This service is currently outside of the Fentress Design Team's current scope of work. Below is our understanding of the. scope of work required: SCOPE OF SERV/CES • The purpose of this task is to allocate additional budget for Kimley-Horn to be able to continue assisting the City with the expired Class II permit at the agreed upon hourly rates consistent with the corresponding hourly estimate($16,235). • Up to five Coordination calls and/or site meetings(est.20 hrs.) • DRER Class II permit renewal and certification inclusive of up to 3 rounds of comments and final inspection of installs. (est.60 hrs.) FEE Fees for all base services will be billed as a lump sum percentage of completion.Please see the fee buildup attached. The total proposed fee amount is Sixteen Thousand,Two Hundred and Thirty-Five Dollars($16,235.00). No expenses are anticipated. Billings for these services will be invoiced under the heading#20140021.001,A82 Attached is Kimley Horn's Fee Proposal for this additional effort.Your assistance in facilitating the request of this additional effort as a modification to our contract is appreciated. Please feel free to contact me with any further questions or comments you may have. If the foregoing correctly states your understanding, please prepare a contract amendment for our execution.We are very happy to be of service to the City and continue our successful relationship. Sincerely, Fentress Architects ' '147.4 ohn Kudrycki,AIA ED AP BD+C Principal enol: Kinley Horn Fee Proposal dated May 19;2021 c: Maria Hemandez,Thais Vieira,City of Miami Beach David Burkey,Anne McNeely,Jenni Gee, Fentress Architects May 19, 2021 Kimley>>>Horn Miami Beach Convention Center Renovation KHA Project No.:043627000 AMENDMENT NUMBER 33 TO THE AGREEMENT BETWEEN THE CLIENT AND KIMLEY-HORN AND ASSOCIATES, INC. AMENDMENT NUMBER 33 DATED March 24, 2021 to the Agreement between Fentress Architects ("Client") and Kimley-Horn and Associates, Inc., ("Kimley-Horn") dated May 14th, 2014 ("the Agreement") concerning the Miami Beach Convention Center Improvements at 1700 Convention Center Drive in Miami Beach, Florida 33139. The Consultant has entered into the Agreement with the Client for the furnishing of professional services, and the parties now desire to amend the Agreement. • Therefore,it is mutually agreed that the Agreement is amended to include Additional Services to be performed by Consultant and provisions for additional compensation by the Client to the Consultant, all as set forth in Exhibit A hereto. The parties ratify the terms and conditions of the Agreement not inconsistent with this Amendment, all of which are incorporated by reference. KIMLEY-HORN AND ASSOCIATES, INC. Jorge L. Fernandez, P.E Vice-President Agreed to this day of , 2020. By: . (Print or Type Name) Title: (Member or Manager, as authorized) jEmail Address) , Witness (Print or Type Name) kimley-horn.com 35.5 Alhambra Circle,Suite 1400, Coral Gables Florida 33134 305.673.2025 Kimley>>>Horn Page 2 TASK 1 —DRER CLASS II Project Understanding The purpose of this task is to allocate additional budget for Kimley-Horn to be able to continue assisting the City with the expired Class II permit at the agreed upon hourly rates consistent with the corresponding hourly estimate($16,235). • Up to five Coordination calls and/or site meetings(est. 20 hrs) • DRER Class II permit renewal and certification inclusive of up to 3 rounds of comments and final inspection of installs. (est. 60 hrs) Kimley-Horn does not guarantee the issuance of permits or approvals. If permits are issued for this project, the conditions and expiration dates are the sole responsibility of the Client. Kimley-Hom is not responsible for extending time limited entitlements or permits. Additional agency requirements from those above will require an additional service. Administrative and accounting time will also be billed hourly. kimley-horn.com 355 Alhambra Circle,Suite 1400, Coral Gables Florida 33134 305.673.2025 I Class II Hourly Services Estimate Kimley-Horn&Associates d o ours ' . Contract Hely Rates Contract Rates Est. Est.cost for Oct.2014 Range Hrs. amend.33 Amendment 33,-.CL'I permit_&cert::. Principal S240-$280 S280.00 2.0 $560.00 Senior Professional S165-S245 S245.00 33.0 $8,085.00 Professional $90-170 S170.00 42.0 $7,140.00 Analyst/Junior Professional S105-150 S150.00 3.0 $450.00 Senior Technical Support S105-$125 $125.00 0.0 $0.00 Technical Support $70-3125 S125.00 0.0 50.00 Support Staff $5.7.50-582.50 $82.50 0.0 $0.00 Totals this activity: 80.0 $16,235.00 'Hours Total(Est.) 80.0 $16,235.001 Page 1 of 1