Resolution 2021-31820 RESOLUTION NO. 2021-31820 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE CITY MANAGER TO EXECUTE PHASE 1B, THE DESIGN DEVELOPMENT PHASE, OF THE CONTRACT AGREEMENT BETWEEN THE CITY OF MIAMI BEACH AND JOHNSON CONTROLS, INC. PURSUANT TO REQUEST FOR QUALIFICATIONS (RFQ) NO. 2017-119-KB FOR A SMART CITY STREET LIGHTING SYSTEM - DESIGN, BUILD, OPERATE, AND MAINTAIN AGREEMENT, IN AN AMOUNT NOT TO EXCEED $1,303,885. WHEREAS, in 2016 the City's Public Works Department conducted a citywide photometric analysis to assess the space of the City's lighting infrastructure; and WHEREAS, results from the analysis determined that large areas of the City were either over lit or under lit and that only about 18.2% of the City's roadways fall within the acceptable range for illuminance and uniformity when compared to City standards; and WHEREAS, in addition, the analysis recommended that the City should work with the industry to develop a Lighting Master Plan that would define the City's lighting goals, improve uniformity, and upgrade existing lighting to light-emitting diode ("LED") and to improve operations and maintenance with the implementation of a Computerized Maintenance Management System ("CMMS"); and WHEREAS, at its June 7, 2017 meeting, the City Commission approved the issuance of a Request for Qualifications (RFQ) No. 2017-119-KB for a Smart City Street Lighting System - Design, Build, Operate, and Maintain, following the Administration's recommendation to address the analysis' findings, as well as preparation and implementation of a Citywide Street Lighting Master Plan; and WHEREAS, at its October 31, 2017 meeting, the City Commission accepted the recommendation of the City Manager, pursuant to the RFQ 2017-119-KB, authorizing the Administration to enter into negotiations with Johnson Controls, Inc. for the Smart City Street Lighting System - Design, Build, Operate, and Maintain agreement, as the top ranked proposer, via Resolution No. 2017-30077; and WHEREAS, Johnson Controls, Inc. had originally proposed an estimated $3,600,000 for Phase I Design; however, the City did not have a dedicated funding source for the proposed cost at the time, and the City Commission recommended that the contract be referred back to the Finance and Citywide Projects Committee ("FCWPC") in order to provide more information on the "Smart City" concept; and WHEREAS, at the direction of the FCWPC, the Smart City project was placed on the April 5, 2018 General Obligation Bond (G.O.) Workshop committee agenda, in order to be further evaluated for budget and funding purposes; and WHEREAS, during the April 20, 2018 FCWPC meeting, the FCWPC made a motion to proceed with reviewing the scope of services of the proposed agreement with Johnson Controls, Inc., and the possibility of dividing the scope of services in two phases: Phase 1A: A Master Plan Concept Design Phase, and Phase 1B: Design Development Phase; and 1 WHEREAS, at the June 29, 2018 FCWPC meeting, the Committee discussed the Johnson Controls, Inc. agreement in further detail and concurred with the motion on April 20, 2018; and WHEREAS, at its November 14, 2018 meeting, the City Commission approved Resolution 2018-30612, approving and authorizing the execution of Phase 1A with Johnson Controls, Inc., pursuant to RFQ No. 2017-119-KB, relating to developing a Citywide Lighting Master Plan Concept Design, for a not to exceed amount of$1,863,895; and WHEREAS, it was further directed by the Mayor and City Commission that upon completion of Phase 1A, and should the City elect to move forward with Phase 1B, the Public Works Department would be required to bring the item back to the full City Commission for approval; and WHEREAS, deliverables for Phase 1A included: a citywide lighting inventory, Smart City Lighting Standards, Urban Lighting design Report, and Preliminary Order of Magnitude Public Benefit Use Case Analysis & Data Strategy from Smart City features; and WHEREAS, Phase 1A has been completed with all deliverables approved and adopted by City Commission at its May 13, 2020 Commission Meeting; and WHEREAS, during Phase 1A, the consultant provided a deductive change order in the amount of $129,433 for work which was determined to be implemented as part of Phase 1B, revising the contract amount for Phase 1A to $1,734,462; and WHEREAS, at its May 13, 2020 meeting, City Commission decided to halt Phase 1B of the Smart City Street Lighting System Project due to the COVID-19 pandemic, and in compliance with the Administration's directive to reduce spending; and WHEREAS, Phase 1B, which was originally estimated at $1,174,452, is funded from Capital Improvement Project Numbers 27800 (Street Lighting Improvements) and 64918 (Street Lighting Masterplan), and the $129,433 amount deducted from Phase 1A has been added to Phase 1B for an updated total of$1,303,885; and WHEREAS, Public Works is ready to proceed with Phase 1B as originally proposed by Johnson Controls. NOW, THEREFORE, BE IT DULY RESOLVED THAT THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Manager hereby approve and authorize the City Manager to execute Phase 1 b, the Design Development Phase, of the contract agreement between the City of Miami Beach and Johnson Controls, Inc. pursuant to Request for Qualifications (RFQ) No. 2017-119-KB for a Smart City Street Lighting System - Design, Build, Operate, and Maintain Agreement, in an amount not to exceed $1,303,885. PASSED and ADOPTED this 28th day of July, 2021. ATTEST. G Dan Gelber, Mayor 0 l31 r �•. APPROVED AS TO P `''C Rafael E. Granado, City Clerk "` FORM& LANGUAGE y 8 FOR EXECUTION IH ORP ORATED..' 2 .7.1!b —11 - Resolutions - R7 U MIAMI BEACH COMMISSION MEMORANDUM TO: Honorable Mayor and Members of the City Commission FROM: Alina T. Hudak, City Manager DATE: July 28, 2021 SUBJECT:A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE CITY MANAGER TO EXECUTE PHASE 1B, THE DESIGN DEVELOPMENT PHASE, OF THE CONTRACT AGREEMENT BETWEEN THE CITY OF MIAMI BEACH AND JOHNSON CONTROLS, INC. PURSUANT TO REQUEST FOR QUALIFICATIONS (RFQ) NO. 2017-119-KB FOR A SMART CITY STREET LIGHTING SYSTEM - DESIGN, BUILD, OPERATE, AND MAI NTAI N AGREEMENT, IN AN AMOUNT NOT TO EXCEED $1,303,885. RECOMMENDATION The Administration recommends approving the Resolution. BACKGROUND/HISTORY In 2016 the City's Public Works Department conducted a Citywide photometric analysis to assess the state of the City's lighting infrastructure. Results from the analysis determined that large areas of the City were either over illuminated or under illuminated, and that only about 18.2% of the City's roadways fall within the acceptable range for illuminance and uniformity when compared to City standards. In addition, the analysis recommended that the City should work with the lighting industry to develop a Lighting Master Plan that would define the City's lighting goals, improve uniformity, and upgrade existing lighting to light-emitting diode (LED,) and to improve operations and maintenance with the implementation of a Computerized Maintenance Management System (CMMS). At its June 7, 2017 meeting, the City Commission approved the issuance of a Request for Qualifications (RFQ) No. 2017-119-KB fora Smart City Street Lighting System - Design, Build, Operate, and Maintain, following the Administration's recommendation to address the analysis' findings, as well as preparation and implementation of a Citywide Street Lighting Master Plan. At its October 31, 2017 meeting, the City Commission accepted the recommendation of the City Manager, pursuant to the RFQ 2017-119-KB, authorizing the Administration to enter into negotiations with Johnson Controls, Inc., as the top ranked proposer, via Resolution No. 2017- 30077. Page 1666 of 2012 Johnson Controls, Inc. had originally proposed an estimated $3,600,000 for Phase I Design. Since the City did not have a dedicated funding source for the proposed cost at the time, and since the RFQ award was approved prior to the impending appointment of new Commissioners, the City Commission recommended that the contract be referred back to the Finance and Citywide Projects Committee (FCWPC) in order to provide more information on the "Smart City' concept. At the direction of the FCWPC, the Smart City project was placed on the April 5, 2018 General Obligation Bond (G.O.) Workshop committee agenda, in order to be further evaluated for budget and funding purposes. During the April 20, 2018 FCWPC meeting, the Committee made a motion to proceed with reviewing the scope of services of the proposed agreement with Johnson Controls, Inc., and the possibility of dividing the scope of services into two phases: Phase 1A: A Master Plan Concept Design Phase, and Phase 1B: Design Development Phase. At the June 29, 2018 FCWPC meeting, the Committee discussed the Johnson Controls, Inc. agreement in further detail, and concurred with the prior motion made on April 20, 2018. At its November 14, 2018 meeting, the City Commission approved Resolution 2018-30612, approving and authorizing the execution of Phase 1A with Johnson Controls, Inc, pursuant to RFQ No. 2017-119-KB, relating to the development of a Citywide Lighting Master Plan Concept Design,for a not to exceed amount of$1,863,895. It was further directed that upon completion of Phase 1A, and should the City elect to move forward with Phase 1 B, the Public Works Department would be required to bring the item back to the full City Commission for approval. Phase 1A has been completed with all deliverables approved and adopted by City Commission at its May 13, 2020 Commission Meeting. Deliverables for Phase 1A included: a Citywide Lighting Inventory, development of Smart City Lighting Standards, an Urban Lighting Design Report, and a Preliminary Order of Magnitude Public Benefit Use Case Analysis & Data Strategy from Smart City. During Phase 1A, the consultant provided a cost-reducing change order in the amount of $129,433 for work it determined would be later implemented as part of Phase 1B instead, making $1,734,462 the total cost for completion of Phase 1A. At its May 13, 2020 meeting, the City Commission decided to halt Phase 1B of the Smart City Street Lighting System Project due to the COVID-19 pandemic, and in compliance with the Administration's directive to reduce expenditures. Phase 1B which was originally estimated at $1,174,452 is funded from Capital Improvement Project Numbers 27800 (Street Lighting Improvements) and 64918 (Street Lighting Masterplan). The $129,433 amount deducted from Phase 1A has been added to Phase 1B, for a new total of$1,303,885. ANALYSIS Phase 1B encompasses the tasks below. Page 1667 of 2012 1. Development criteria for the lighting system Computerized Maintenance Management System (CMMS)for urban lighting assets. 2. Preliminary Upgrade Plan and Construction Plans for Architectural and Street Lighting Design Upgrades 3. Smart City Roadmap 4. Connectivity Scope 5. Financial Scope 6. Records, Data, and Assistance 7. Preparation of Implementation Contract Additional funding in the amount of $10,000,000 was approved for the implementation of Phase II, as part of the approved G.O. Bond, on the November 6, 2018 ballot. SUPPORTING SURVEY DATA Results from the 2019 Resident Survey show that 64% of residents rated street lighting as excellent/good. In order to continue maintaining excellent standards in this area, the Administration recommends executing Phase 1B of the Contract Agreement with Johnson Controls, Inc. CONCLUSION The Administration recommends approving the Resolution. Applicable Area Citywide Is this a "Residents Right Does this item utilize G.O. to Know" item. pursuant to Bond Funds? City Code Section 2-14? Yes No Strategic Connection Prosperity - Market and promote Miami Beach as a world class arts, culture, and quality entertainment destination. Legislative Trackinca Public Works ATTACHMENTS: Description • CitemetrixAnalysis_MiamiBeach_2016 o PS - JohnsonControls - City of Miami Beach Phase 1A Fully Executed Contract o Resolution Page 1668 of 2012 I A fiti E (11! 1.1 atelum 14 // CITEMETRIXT ANALYSIS GROUPE eDF '..-1-'1 R,.. ,...-,...y.; t^f ,r. - .:..., .,_ i,«iFSi. .:.:.u.,m r!i; STM. i'PRz4• a.+ay y- •_ .�km.. —+ : �..nar m _� .."_.,.. .,. ,�. ,,.'. _ :`., ,_�. ''''',--:----iii,-,--- � -" tea:._... . - -..._. . 'oc:,.. ,�.—. �i f-tV K_. ' o. , : �.._ + fir. ale - i �.�. -• - tel - --- • ,y�`Iiyiul1.R.. r - �� ��^i M .�r- WO II''\r ,.n` Y r air �' moo... •� y I -!--1 • A . .-tit --;"' ---11.---- _ .. "-,lorigir -N,Ir piii -11.516%; ' ,, - _ • t r ---, . /i/ // 04 06 10 I. Executive Summary II. Measurement Procedure III. Importation and Evaluation Data Citemetrix Analysis The Photometric Patrol Car&Muse® Import/Quality Assurance Software Description Number of Roadway Segments Accessibility Issues Miles of Roadway Measured Distance Breakdown Evaluation Standards :":.. ._ :_ "'-'—'-`-'7.,:-.-- ..-- ,. .,.." -;x,41 r . � ��"! - .,._....- - _ . ....tib :.: � '.. _._ "�.^^.-h 1.. '+.s .pP�' - ,.' N r.r�--�- ,ecsar"�'�,.,,,,0„._„„___,,,___. ,,;,�... h "i !II0 v Y 1 7 jai 3.4 w. + µ- _ - w0••-. 14 22 -40 IV. General Findings Overall Summary V. Specific Examples VI. Summary/General Lighting Levels Neighborhoods Underlit Recommendations Measured IL Overlit South Low Uniformity Overall Summary Central Variance From Standard Biscayne Bay North Uniformity Compliance Uniformity Overall Assessment Uniformity Overview IIIII,R.Wful„,4,11,W,il.,,u111.14 „,,,,..,,-,...„: -i.vi,,,11,up i ,,,h,.,14,,.,•., ..;,,..,...,1,..,:v...:.t,. .ii,,,I,!,,i,. ,?„..-,......1:...,,....1>,..t,k... .•., ,,,4;f4'...3"'s;,.,A.'. A ,!”, '00** ;', v'ttittAVIrkl#41.14'"?...0. ' `"% ' "'Z."'" ".1.*';'"' - Clek.lipt;ILS.:1: r!.:':',.4,.:,'Y,"-..i., SECTION 1 i, ,..,. :•.:f4,.:Ai;t2,t;,,e.r,--1,,‘,. 1 I ',.:".1•4,-,-;...,.•L- qv' `1'.. , -1.,,J.,,. i EXECUTIVIESUMMARY . ! . . . , CITEMETRIXTm ANALYSIS . . - V„, . ... In m I'c , F201 5 Citelum apprbaohed the City of Miami Beach to propose .i - „,,.1.., ,. . ,,,*,1k,-;,,,-;.,--.'..!...t.',, i4:14:0, the preparation of a Lighting Master Plan. The goal of such a plan is to '.,-,41v.-;.,,,.: . ..,,,,..;:.,. . ,, , ,.- :).:,..k!igi, ensure that the City has appropriate and desired lighting levels and lighting 1,'"v-.1 i'$1,1,-.ripe!.:-,,,,:',''.,,, uniformity in accortlance,with its goals for to rism and public safety, among , other things. Essentially,the right light at the right place and the right time. Generally,such a process begins withl assessing the City's current lighting by conducting a comprehensive. 1 , I / . -; inventory and analysis of lighting leveis,I.e.,a Citernetrix-Analysis.Since the city has an existing,albeit z i.,:,,i,, -, - somewhat dated GIS database of its street lights,It was decided that this database could be Utilized for an,.. .';'..,;-,,,,z,4!:.:',,,,,,,, ,,'. initial analysis. 1 P''''''''-' ''''''-t•,,,.; ..'e;-',1','-4''''' ',' ,,[iM .. .,„' )• •-L- 1--..--..,;-.,,,•\•:- ,,!4',L.' Citelum was advised that one of the Clity's main concerns at present AS to analyze the current fighting in the city...,, 4,,.. . ,, 4.• : i . '.- ,-...,,,`;, and assess Its adequacy.Citelum wa I ultimately contracted to oerfoqn a— .t,traVIce:11 .. of f . Ca .S street lights for this purpose. ' b',,,,i'-i',..'"'7' :' - P-.[ .;i::::. 4'.:4":1'Y,'-' ;:f.'.:.;,'''...''T.'01:'.:::,:- 1 •.:40-4:y.,,4,;-' '... .,.--0 2,,,,-r-,-,,,,$iv.4.,-,,-;;:zik-4,',A„,,,„e• Citelum sent a team of technicians to perform a city-wide photorretric analysis for Miami Beach. over ,-..-,,.. the course of multiple wee ks,the team drove and measured pert' rmance of all accessible roadways-- ,Li si.),,i.v , -14 .,'[-,":•'. -...-,-0. c.-- ,...-..;','' '' i'"r•l?'.. This triformation was then mapped and analyzed by Citelum engineers in oder to generate a top leve'..- :,..',,,',.4,,.. ,,,,, undentanding of lighrtIng performance ,cl „`! •,..,?,4,1; ;. .1;t0,,cet ;.?"3Viii;",i;•:',.;,Z *44',/- '"" ''' ' , . 1 1.0 %. c...... ir.s:.S.t) ',t,4t:: . ,. ..,,, . 1111.1.184 bilopp.iii;l1,,ar la, .04r4t.:' to..44k-• d.. -.. i' , r* T 4 _./44.;.....L -- + It. �1"A t 71$ a•x , e i • J ' •r ' •r „' a • .. - l f kyr, •- - - • -•• - '''',-S •;‘,..,---- -., , •_. -: • .„,464 , . . . . .I.I \ 2 , . , , ),... .... , „...L.... . . . . . •11114...rth.,•; .• . .4' . .. / • t 7 •Ai/ : .I lit I I I'. • '41 4114' t : . 1:Pr'.r.„1-A;:'L.:."-°....‘.*IP Pi i ,e:'"r.j-: '-.4 r 415; ' ..t l, . 41, ..... . . ., _ . .... ,. . it , • .. ... , •• , . ..,,,. , _ . 44,- . . ., • izik—ii,- ,..4.....i • :. ...:...,....:._ .7,,,, . f.--. • 1al .1 . a • -•I --.=; .; +' Yom. • ��' . ilk M -*I; .4r- \ V , �- i-- •4' 'N. n s w - • .* .2 • 1,.4.1...**, -- i. Y iLi , _ I l 'I - .... - - •. _; J_ , . a . .. .. .... .... . . _ , ., . . . , __ ,„ _., . . . P 1 SECTION II 6 MEASUREMENT PROCEDURE THE PHOTOMETRIC PATROL CAR & MUSE® Citelum's Citemetrix`" Analysis is performed using our proprietary Computerized Maintenance Management System, MUSE', and tailor-made smart lighting vehicle, the Photometric Patrol Car. MUSE- provides all software from route design to data integration, and from cross analysis to automatic reports. 1� F. M1 The Photometric Patrol Car is equipped with an Illuminance meter(Konica Minolta T10-A),a ��" h Q �ROlr GPS radio(BU-353)and a Control PC/Laptop.Through a CAN bus interface,the equipmentQP r r also collects the location and odometer readings directly from the vehicle that are then 11°4 11 factored in and recorded to the Control PC running the Photometric Module. LUX meter reading is recorded for every wheel rotation,in this case every 80 cm. Equipment calibration is performed by external certified laboratories periodically.Additional information on the measurement tools may be found in Appendix C. SOFTWARE DESCRIPTION ACCESSIBILITY ISSUES 7 During the data collection of the Citemetrix'"Analysis in Miami Beach,specific street Citelum worked with the City of Miami Beach to gather as much existing data as possible segments were not measured due to accessibility restrictions. to ensure a successful measurement.This included the GIS layer for street light locations as well as the street centerlines.This data was then imported into the MUSE GIS platform List of Inaccessible Streets: as the basis for the creation of measurement routes,known as"itineraries" The itineraries are generated as a method to systematically measure all roadway segments in an Espanola Drexel Ave. Meridian Ave. optimized manner. Lincoln Ave. Lincoln Ln. W. 63rd St. Lincoln Rd. N. Bay Rd. 34th St. After the itinerary segments have been created,patrols are scheduled and they are Lincoln Ct. 14th&Bay Rd. 87th Terrace downloaded to the Control PC.The patrol team consists of a Driver and a Control PC Technician.The Technician acts as a navigator,providing required direction to the Driver Euclid Ave. Alton Ct. Atlantic Way&80th St. to record measurements for each itinerary.The Control PC automatically indicates when the data has been acquired successfully.Also,itineraries are color coded so that roads to be patrolled are easily distinguishable from roads already patrolled.At the end of each patrol,data is reviewed and uploaded to the main database for additional quality control. _. Isom.• i �1 k" �c,,.rnr••...�- W Atli0 1'11.' . • ,,,--- - -, - .„ . • II -11 r ' ' - .. ....•••• ��■ �if , - y_ i } �.- '= mfr' ` 1 ,� to .-Al �. y _ 7 Et —��� r �.•: a i� + ' yr. • r - - - _ Arra_ • ." r— - . yi • 7r �r ..-,.....0=-,,,,. = ., � • ••-01F + - - _ _ti411T7,- -...e."--1-:-- qA Nld , ,air.4.4111 £. 7 11411111:6 .r., . + '•* ... / err .r r--_ _...,„_,'",Tec_.- /4 k, ". _ _ 6 - i _ _ yr 1 rr� ' _ 7Et!!^- ' r (y.,. �•~.,..* 4, r - .�„lam �� _ ..' .. _ • �, . ,i 1 '. - •+���,.� • +YAK . ' * , + ,' _ Its I t�.o..,,4 1 -•. - y � - . f' 'Y O. alt , ` ' 4.., ,�� t7 Pee.1676 of 201 `+.,' •�.` ` • Slat .W.... .,liV..42,._i . "r.044.- - _— .'AI r�r 9 THE PURPOSE OF A CITEMETRIXTM i �.M ANALYSIS IS TO TAKE THE FIRST ` , , .q r - -- STEP TOWARDS A FULLY DESIGNED 4 _ LIGHTING MASTER PLAN. '� a' .s /4 1 .4 °i, -.1 f3 - _ .. 'T".4* � tll n fr� •11' I.rt+#ii,tib•4: .. ta. : :44 . 4"' f. . fiiii.i :t4 -` 1, 'tr." ,i 4'. �� _ HOW MUCH LIGHT IS THERE? " � �_ - ''• HOW MUCH LIGHT DOES THERE ,� { NEED TO BE . }, r Jaw , . FOR THE RIGHT APPLICATION, .. ,_) . _ •t w FOR EVERY LOCATION I T :.. " CITY EABEACH? w 'c Page 1677 of 2012 SECTION III 10 NUMBER OF ROADWAY SEGMENTS(3a) lvi P O RTAT 1ON & Roadway Types Sections EVALUATION COLLECTOR 10 DATA IMPORT / EXPRESSWAY 12 QUALITY ASSURANCE LOCAL 1,775 After an itinerary has been completed, all measurements from that route are sent to the MAJOR 379 main database for quality assurance and control purposes. After all routes have been completed and TOTAL 2176 quality-checked, reporting can be performed, as described in this report For Miami Beach, we broke down the roadway segments by roadway type (accompanying chart 3c). The total numbers of segments, and their related DISTANCE BREAKDOWN (MILES) (3c) distance are reflected in the accompanying chart: ,,t'Tft:t•;f f' hyy ..j /''��71u k w, Ai 1 T.h,�fl�, E vF ? Y h�'1� 1. d �. 7♦ r � kh r hk r �'' rrt't i�'� `� �M1rry�;� x� •� t rh,� '�S ST� r �, �R,� �N" 1. 11 MILES OF ROADWAY MEASURED (3b) Roadway Types Distance(Miles) Distance Percentage For reporting purposes,all results are segregated by roadway COLLECTOR 1 .46 1% type,and in expressed distance instead of by number of street segments.This provides a better base of measurement,as EXPRESSWAY 10.05 6% roadway segments may vary in length. LOCAL 124.40 73% MAJOR 33.59 20% TOTAL 169.49 100% MAJOR(20%) LOCAL(73%) COLLECTOR(1%) EXPRESSWAY(6%) tt�` U' t f roM ,,.. ,. ^S i 1:. a y W:v ap eYI" ' sr• .-77. ,,:.„,- f�,,4r. Y" �'.f v , }r"l'at°q:; �'A M"4� ��} � 1+x.::01...%,,11...f,.!:',!,?"� tW.�� ":F :, 4 k N a Ft$"�ra Gx� v4 I r t l Y�� till II Iii ill II I �il'I{. k,tk '��.ch�'P �k � II`"Y i�i�7�i�� �����,�M'wi' U�I� .ul�l:� i pal } 4y, ��. 4� IPa 5 >P�,, A �Ir4 ���X' '�" r Is i �I "�' 4 -t' 1 0q, l 7 ^G , y Il%� s'i fr�l� I+ O d t,�,..: de 41, ,. '+ u K ro y 4k ,b, q. iI t ��I 4a "Lv �r��fi",� i!:;4, r, w Sae s v.� . a'e J`o g SECTION III IMPORTATION&EVALUATION(Continued) 12 EVALUATION STANDARDS After reviewing and providing quality control of the collected data,Citelum was able to begin the evaluation process.Our goal was to evaluate the measurements against accepted lighting standards,identify over lit and under lit areas,and calculate the uniformity of each roadway segment. In order to evaluate the data collected and compare lighting levels to known standards, Citelum made specific assumptions. 1) Citelum used the IESNA RP-8 Roadway Lighting standards to set the acceptable lighting level requirements 2) Within the RP-8 standard,lighting levels are outlined by roadway type, pavement classification,and pedestrian conflict level. a. Citelum assumed that the roadways measured all have a pavement classification of R2 or R3. b. The roadway types defined in the RP-8 vary slightly from the City's roadway type definitions,and therefore,we made the following assumptions: Page 1680 of 2012 Miami Beach Roadway RP-8 Equivalent Pedestrian Conflict RP-8 Recommended Illuminance RP-8 Recommended Uniformity 13 Classification Nomenclature Nomenclature(Assumed) Area(Assumed) Level(f.c./LUX) Ratio(E„,/E00 INTERSTATE EXPRESSWAY LOW 0.9/9.0 3.0 ARTERIAL MAJOR MEDIUM 1.3/13.0 3.0 RAMP COLLECTOR MEDIUM 0.9/9.0 4.0 RESIDENTIAL LOCAL MEDIUM 0.7/7.0 6.0 ALLEY LOCAL LOW 0.4/4.0 6.0 BEACH LOCAL HIGH 0.9/9.0 6.0 The photometric measurements taken were measured with a greater number of significant figures than normally factored into the RP-8 prescribed standards.Also,based on Citelum's previous experience,it would be highly unlikely to find any roadway segments adhering exactly to the strict standard. Therefore,Citelum included a safety factor to expand the standard values to be a range of values. For Illuminance,we factored in a±25%allowable variance from standard and for uniformity,we factored in a±20%allowable variance from standard. Page 1681 of 2012 717.1. ;4'. SECTION IV 7, v a 'hl 1 it ,i " ',. Y lk I' 1i,it ` '7 LIGHTING LEVELS rFulr RESULTS rrvAr>r�frvr�ixni 1 GENERAL FIND IN '•1.RA L L S� �� /IR' For each roadway segment,the average Illuminance has been calculated based on all measured values for this segment.The full results are available in Appendix A. The following values have been analyzed for Then for each roadway type,the average Illuminance has been calculated and compared to photothetric results: the RP-8 standard values.Results below are displayed in foot-candles(fc),following the IESNA recommendations. • Average lighting levels • Lighting level compliance with standards Roadway Average Standard . • Average uniformity Types Illuminance(fc) llurninance(fc) • Uniformity compliance with standards EXPRESSWAY 0.92 0.9 All results are broken down by roadway types,following the IESNA recommendations, MAJOR 1.07 1.3 y ,':.:',.!*14 '� .,,k,,,,,'.,"1..4' �; � ° , , . , a `" 4 COLLECTOR 0.68 0.9 .,,',:e. .� ' art{„ � 1 fit} Y, ['C,s a r1 . "' fMfk .,µE.I, ywy ay'.byVp' * �1- -A`f; }....,,...,11...,,,.--7 . • �' ^1ER { vA ,,a�kti. ,i. a �$ ; Jd Z•, r +* k i x, .,:, F "1^ qv-e-.'4. ^ . '2 ,-i r rw 'fid �,y� t {. ,y„S,, t, r Itsi , t ,A,144'4'f::. ' t4 . LOCAL 1.11 0.63* 4 ;rt..; -. 1 m kti u�' p,}ij • 1 *Standard Illuminance for local roadways can either be 0.4,0.7 or 0.9 fc 1 h t , ''' "'4 g�I�'IyJ, based on pedestrian conflict area factor. ! { ',!:•!...1, �1gi'; r,, II '.':;!,•$••4:',.•:',;2...'3„;;;,!.'r.' f , ., lrplll •0 Y 1 ry 44 Average Illuminance(fc) Standard Illuminance(fc) _ .' — Y'" ,1u MEASURED LUX .`." ----- Meets Standardsira�' I ' x1101"zi w I r : ' L LI N,,, ICY Ir i11"1 10 ^t "1�h�"'r.iS ' QVerllt T r, EXPRESSWAY Underllt ; A 'VIII II AIN RIGHT ./: r. .-04-0-,4-3 ,.••••sem. -fi=r-_ _ •..,...„,..........---4111 j 16 .. q Y. t -.,—fir:7 r-- ,..,gj„„4,,�� .1*. ,fes � t � �'^;7., +�til-; (i(,-.......,-..-I4-t.� ! t • r}. t;1.,.:.,,..,—;- 4 ,'y r ti ,','-`,*1.-1.4-,-. .. ,-tt,..",! 1,I f .*-- g..1 l 1.3 'S i.- \'''.71/ "4.,,„„c.--.3' -"q Jo..! , •; vt .....k '71 ' "; •-:14-wi, ''. a.. 1 '- -•• • a zri-,..t. vki.•.:. i% I. id !; • !} i1 �.` " _ SWM C `Si11 �4 ' ` 1 '‘A.A. -4 � ., 1. - ,.. .a. • l • 7777 . Tr/ L L14 L i I • SECTION IV GENERAL FINDINGS&OVERALL SUMMARY(Continued) .11."1:7...-•:k. i r (4,,,i, ., 4 p M 0 OVERALL SUMMARY s. The following map provides a graphic representation of measured t VARIANCE FROM STANDARD Illuminance compared to the applicable standard. Red +1.0 (Over Standard) Orange +0.5 Note specific areas of the city are consistently overlit while other sections E Yellow 0.0 (Equal to Standard) are lit below standard- Further detail on measurements can be found in °— Grey -0.5 subsequent pages of this section. Black -1.0 (Below Standard) Page 1684 of 2012 • 1 li 17 i. r „ - a ! ▪ err a • • r�` y I .. ' . , .<'• x :..,,;.1.-„,-0".;,..Y--..,,,I.,'t i„,-4....•:;,o .." 'G k"Nt .' ' i • "1 ,A mor t--- L;.+ �. I } 'o J --• =or r- , . . ...,1,.....4;;:i.ti,..,,,.1....,:.:.,•„..,.:p.- !......1!,•...":14.... iin wl I� Non R.J•�� P .� I q 0..;•,4,' p a ss �r r- =�,. r --1I IN�r r R>!� i], nn-IR unior r 1 I 1 , MINN • .5 { r 11•#Y •.It • __ '�.1►.�•ilk _._ '_J' 1 ,.... �I ..•:....... • • -;.-.1-..-.4 e .' >ti. 11E ' . I ill_- ‘ �I ai. ...: r; - ' .I•• .. -- ---1--•-.-- Ing ..al .��a 1 • . .... - •`., • v+-1 fame -`_ -� 47"x. / 1 .. - 'U as— 111111111.1111 .1� __ -� JIB ` e.� i. a 1 . •�,,,,_ • �. 11T 01lsl o 3 �. , �:"' �] law 1 . SRF. '. .i t.fi ! I 1.111111111114111"e". "'nom tIX I 111 Mh 4 '� ..ri►' �t 40, a A�rrcI 1�I�1 r,l. gip„ . + r M. ..VTI' • T -I, aiil+pYtiG • r • • • SECTION IV GENERAL FINDINGS&OVERALL SUMMARY(Continued) 1 8 OVERALL SUMMARY On average,expressway,major and collector roadways are lit below standards. When comparing results to recommended standards,the average Illuminance by street Local roadways,however,are highly above standards on average. segment can be deemed: • When we break down the results in terms of compliance with standards,a roadway type Compliant with standard(if included in a+1-25%range) • can appear close to standards,but individual street results are typically overlit or underlit, Underlit giving the incorrect impression of averaging near the recommended standards. • Overlit The results below are shown in percentage of the total distance in miles for each one of the four roadway types: Roadway Type Underlit Compliant Overlit Grand Total EXPRESSWAY 59.1% 8.1% 32.8% 100.0% MAJOR 46.3% 33.1% 20.5% 100.0% COLLECTOR 67.6% 12.4% 20.0% 100.0% LOCAL 33.3% 16.2% 50.5% 100.0% GRAND TOTAL 37.7% '..',). 43.2% 100.0% Paye te88 uf2et2 • Underlit ' Compliant • Overlit 19 EXPRESSWAY =I MAJOR COLLECTOR LOCAL 0 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Page 1687 of 2012 i .. 6ti '�dbdt, h t SECTtt 1W,GENERAL`F`IWINCES,O1 ERALLSUMMAR"k*'I '� ,' ,.. , ,..;,..:i,- , , 20 I lri I rli IJ; w f A r ' I k yleml ',10,r 1, rhe�d rF h `° Then for each roadway type,the average uniformity has been -;, t _ ,,,,c.9..4. calculated and compared to the standard values, following the ., r. ..:1P,1,... IESNA recommendations. The results are below: Jryy�'1 CAL. LAT4N0 UNIFORMITY ULL RESULTS 1NAPPENtD#X B. Road y types Average Unrforrnity SY<JndardUr.rforrnrty f ei wa roadwa► t+i the average ufor�1 ,�„ f t as a o> d bad o 1 measured.v l es EXPRESSWAY 4 3 4-s segrn nt,:using fie following forrnul�: , ' MAJOR 8 3 �# ' ' ' J � 1 ; ANCE - COLLECTOR 4 4 1 � 'T.,. .. rl 40 B -1 r 4a� w r'T;im"? rti°r > Sie 't , 1 • �' LOCAL 7 6 w I, -,,,„..,..,,,..-411 r .,',,,,,•.,'i, I i,} JIw r ..:Lr i -I'' II .: I "I.,,i t r' € 'JE d .�F r A� a I. r , 'f:',"II' r? � , a N., x1''r7,.1P5i1A;i4o s `s , . . 21 Average Uniformity Standard Uniformity _ / COMPLIANCE UNIFORMITY _ !!-_41! • y -` .•.''11 Uniform formit � "1 High Uniformity �/ EXPRESSWAY • ABOVE This map shows the uniformity of road segments in Miami Beach.Black lines represent S }w^* 4r ; l ;5 I road segments with low , ° ` ? ,�';�' '...4.10: . { ;i uniformity.Green lines MAJOR .. represent road segments with adequate to high uniformity. w 1.:. 1 ; 4111T)09''a' 1 3 COLLECTOR i ITS • . 4 .11 II 111 :j ] .ma -a ., r J' 1111111111111 LOCALin aY. l• tf�t x 1 f,� q IV Zf',• _h Ah t�1 it 11 0.0 2.0 4.0 6.0 8.0 10.0 ':""�•,4:, Page 1689 of 2012 SECTION IV GENERAL FINDINGS&OVERALL SUMMARY(Continued) 22 UNIFORMITY OVERVIEW When comparing results to recommended standards,the average uniformity by Uniformity is expressed as a ratio of Average Illuminance divided by the Minimum street segment can be deemed: Illuminance,meaning a calculated value of 1 is"perfectly uniform"lighting. • Roadways that are not uniform will exhibit bright and dark areas,meaning the ratio Compliant with standard(if included in a+/-20%range) between the average and minimum lighting levels will be a larger number. • High Uniformity(if uniformity is lower than 80%of the standard) • Low Uniformity(if uniformity is higher than 120%of the standard) On average,expressways and major roadways exhibit low levels of uniformity (calculated value greater than standard). Both collectors and local roadways are The results below are showed in percentage of the total distance in miles for each generally uniform or exhibit greater uniformity than required,meaning the ratio is one of the four roadway types: closer to"perfect uniformity"than required. Roadway Type Low Uniformity Adequate Uniformity Highly Uniformity Grand Total EXPRESSWAY 86% 14% 0% 100% MAJOR 85% 10% 6% 100% COLLECTOR 32% 5% 63% 100% LOCAL 33% 14% 53% 100% GRAND TOTAL 47% 41% 100% Page 1890 of 2012 Adequate Uniformity • Poorly Uniform 23 • Highly Uniform EXPRESSWAY MAJOR COLLECTOR IIIII �" , M.'Y r LOCAL 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Page 1691 of 2012 .. .. , a ' • :411, • . • . _ e '''. ,44:44...'..7 ...t.... .• . ',dr . •.,':.....-„:',, • . , . ,. t"--., •••• . , . ' , i • !.... -14 ,#. ..._' ''. •411 =.-. ,•• i 'I •• 4r;g. 1 - • • 111•:... ..,. • . 0. '4../ , : • • • . . . 4101fri, - ,`,--.4.„ 4 ' I .0,' ;:daal.•' 4. 1 'x• to' 4. .... . . i • . 4 4. , liiii, . . I 1 . r4 "' .— !.lo - ti.oir, , . 1 • ,• to :: * 41, , . l ••• 1•44. 14 i ....t ii. . • • . . 4 4. 1 .. 1 • , 1141141 411P1'tiop,' it.••• -I. 4 A , . , . . .. . ! " litattil, , , , ' - ir y ,... '. 11. ,••'" : ,.. ' loP, I• t. ie. -• ' .4.111- •' 1•111k it to %It . 1 : •,• ,, •• .,,a ` , , • # .4 I:,i 14" : .t.0 4111d• 111 II% Ilrilli e, •:, a . , .4 4 .. '• V 4.1:4. 1 kr i . : ' 10441, -$ ... 4 441, _ ., 1 • 14 . a-.• - • 4., p. ,,,,,-: 0_4 t It oft. • •qt . , „e. u; .• 4 iti-16...,i Ili ' -% , 4 4 4 4 4 7 I.4 4 tofts ,.. , • ... ,. ...t '1 11 . iit4 • i...aser w's' i.4.-i_ 1 -1 . • ., it • -*N._ 4 '.011 I •W''•:10 Lr • -, , 4, ti„-..,IL-i, _„,.„. :a ., _ . „‹..4 ,. ,.., ....,,A. ....(.. . , .. . , • . ... , ,„ •:10„,,.. . 1 . , _ ,....,. r i Ir.1 sdiff4 f ;'''"' ,i, i, •.:71r—lrr '4*..4D % iC.- de - • . 1 0 I C 1., ., • .9, 11,''•, h .'' • • -,,,.. -• 7.'" •- 6. 0 • ' -. .-a 1 l•it. 4 ‘,......of ,4 .- :• •• % • .. 44• -... 11F=I . . lot ,,.4 , • - • 1. • - • .. . .- - . . •• .14.: r- • .e. t .,1 ., . . , _ . ., • ., . ,e• ‘.. 4' . - .- •,ft-'41 , . :. ,i, t . .. ,o. , 11'4.-' . -- Nit • 'e__, ".. . .. • . , . ... • .... . - - • • - '' 1 MI ' "t --4.% ..ti • ' • .14k - . * 1 :: .. , •.t e tiv:i - . ":. '411,11601• e- i -..t. - - 4• . , . . , -_-.-.... -, el . To-, --...a '• i . , rp• ,• t• .• -to; • ' '' •i „It .,. ::„.. ..j... 1. it .. ....t.,, „. . ......... „ , ., 4 . Iliallli i.,16 . V 1.- ' , •. 4,,,,::: 11111 o.1 4,' .• ..iir. • 1- ..%. 44" r. I. • -. .,. . 25 SOUTH NEIGHBORHOODS INCLUDED ILLUMINATION TRENDS South Point The South of Miami Beach is world renowned Flamingo/Lummus tourist destination. Currently, most of the area West Avenue is brightly lit. While this may be more light Star Island than standards require, it could be a strategic choice to over light this area. Palm Island Hibiscus Island One exception is the area west of Venetian Islands Flamingo Park, which is considerably darker and lit below standard. LEGEND f 2.0+ 1 .5 1.0 0.5 0 (fc) ..: Z Jr 1 .I . ... 7 ' 0 - . ; . * . .• •• I • .. • . n . ..• . - :1-.....-. -. e . 4v • - . . . t.,i ' •r . _ . ..., .• , . . i .., . -t 1/2 • ..:., , , N. ...#' .•••••• . 7, '‘ ' • : 1:i .... -. '' — .. t r• •- _ . , 41114 iviii — ' .,- • — 4 i _I .. e. ....... - , A ,- a.. 't% • A .L. • -!,,,,V 'A_ . .,.. A • ""....' 1.4-400 ) . L . . ,. , •. 51"." -5F- .1 .4 • - 4, ,.I 1 .iii...r=. kr } 1,''. '• • . *. tilkill° ' . 5' '1 • . 1 "'V iii• - ' . • . •., -. •...7,-7, it. A. W.' _ , ,'•' i 1, 4r,--•°Ili -lir I • ' \! ..--4 ; N,. - . • _ .d 111116,411. „41. g ,.., Afr •'.• , -,. IIP I.' '47. . ' . jigoii=44..2..' "•- ' AO ei.i 4-• _ ,, - .-.. 11 0 --# •ir • ,-- _ J.,• • ... ..-..• -1, 7 . i , ... *1'-. It '111/44.... . A (II . ., 41.... ". 41111.001 , • - ... 1-4 . _ _• . • -131n•••4. • 4 ' ..: ••••. ir.--- 45. a' I " . .111.4.••• , •• . AI':1 -_ • • , . A - :.1 .. ',., 4_ illi 0 .1. ;et ,. • • V.- , r-- * •. , ... ''61.0 -• l' -. S°4 ,- ._ .4.4...• • • .'-- _ , • _. r, , — ... - a - . .. .., bib •1.4 `4,.... f. • ...,-.4,.-It. ..--7-a, il-' didik 'j • IF. .,-, 4 —• ., . ..!_;141-1 • . , . • .1 1__, ... ams ylif a-- ..4..., - - • ,-, •- • #''42% ' ,,.• i• • .4,--.t . , - !.....:,) s • - - ',71 is A : j.,„ isW 41111,44c'ili. ,,,,... _ . ..._-_. - • i , '• , i.. -,-r .--.:4""--r. . • - -se ur•- ••„ •' 4 ,— ..-. • "ii 1: : , ' .4 i ' . • II - • ! i • .k. • • ,- i.r:ir • . , _ 4.. .1, ••,,,, •,.1111,N . . •• ''-'f•••T.it:Nz •" 1. r .04R-,lk,....,..„.„ 4,,:•:, . •,..0k : : .- -.4--`6 . . . • . Illid . ' ;1 • • : - ...44:r-4W1. 4 411:1114eri -1'.-'4P'411460140ft ''' s'Z. - 1 ; 4. ,,, , . '.-• i'4. a trinpyr•_ . •- ,,-, ...- . • :I i -•••.-, 'N. it .. r -) -, —2: . •...',E,L'' - - 27 CENTRAL NEIGHBORHOODS INCLUDED ILLUMINATION TRENDS Bayshore Central Miami Beach begins the transition from tourist City Center mecca to residential area. With this known, lower Ocean Front lighting levels are seen and accepted. These local • roadways are lit slightly below standards. Nautilus Major roadways, such as Alton Road or the Julia Tuttle Causeway, while lit to the same level of these residential neighborhoods, require greater levels of lighting and improvements may be required. LEGEND 2.0+ 1.5 1.0 0.5 0 (fc) •• �.. « m a,.•. FF L +. • • .•= t, .y -• . .„I/ - +► . i 1 .• Y I. ,• •''"Wil i if 4 ill' r h A e t'. rte'! .. I sill- . • '. • • fyi .'y•• •• �` t l•y + •`-'! I'+i, •'r V. 1 t iii ',-- 1~. 1 29 BISCAYNE BAY NEIGHBORHOODS INCLUDED ILLUMINATION TRENDS Ocean Front Similar to the trends exhibited in central Nautilus Miami Beach,the area surrounding La Gorce are lit to a lower level, with major streets La Gorce (Alton Road, W 63rd Street) lit below standards. LEGEND 2.0+ 1.5 1.0 0.5 0 (fc) 3.4."1. • ra fF i •- • •_-1- i.. Y t '1 _ �. _:.7 i- • .,mss 1 �� t � � tri "� t,* _1 . . ;.,,Is , .1-•*4111.' R - 'i• t'k- • • rte r -. i'>�' t.*..,. •'' qN..._—Y:r , -_ 4 1 74 1 Y P" a yLL •flt� a Sy` L ai a i� ;0 a r. ., I #I. �' ! • ac 's- = t •i 1 .4a Itk : • 7 .'€' .. •IOk .r r I _ s •'~ •�. .mo i s. IV., :.- a it, I T _.t.t . . • •�- t a�'o•tt . . .. • • NORTH 31 NEIGHBORHOODS INCLUDED ILLUMINATION TRENDS North Shore As the Miami Beach becomes more heavily trafficked Normandy Isle in the North, lighting levels increase to those seen Normandy Shores in the South portion. Again,this may be a strategic decision by the City. La Gorce Biscayne Point The major difference is the existence of dark spots within the roadway network. On Collins Ave, poor uniformity leads to dark corners lit below standard. Also, Normandy Drive / 71st Street stand out from the surrounding streets with considerably lower lighting levels. LEGEND I 2.0+ 1.5 1.0 0.5 0 (fc) SECTION IV GENERAL FINDINGS&OVERALL SUMMARY(Continued) 32 OVERALL ASSESSMENT In order to assess the overall compliance with standards,Citelum The portions of the data in grey represent the amount of roadway cross referenced the data collected for Illuminance and Uniformity. that is underlit,overlit,and/or not uniform. The following table shows(in miles of roadway)how much of This information is for all roadway types.The data can be parsed i' I ° 9l,M the overall system falls within the assumed acceptable range for by roadway type,as described further in Section 6,General of roadways meet both Illuminance Illuminance and Uniformity when compared to standards. Recommendations. and Uniformity standards Uniformity Underlit Compliant Overlit Grand Total POORLY UNIFORM 17.8 14.0 47.1 79.0 UNIFORM 2.79.r:+ 9.2 21.5 HIGHLY UNIFORM 43.4 7 16.9 69.0 GRAND TOTAL 63.9 32.3 73.3 169.5 Page 1700 of 2012 •• _ : . . • - -. _:.,. __..,„ . ... . . 4... ,,.. • . . . •__—_ . . r -.- - . 1 • .,.1.,_ . • • .=.:.,. -- '.-- . ,•.c. Z.---,-,., • : ... ,;-;_•_:-.,,:',---.. .. • - e ,• .... ..4. • .,.• • .,. . • . .1 1 i li .. . .. . .. ' . ‘ - - . . — • a . . *I . •• r . .. I • . R . - . • • . :•. • . -.....• - ( - - • • . . ... . :--• . - . , _i- ---:-..--• -1 . . .. • -_,..-C',-;-,::-_ . . 1 1. ,... I,M 'i T. -. 1 . .) ,„ ..,.4_- . 1. • ; . ..., ... .... J , • • ' ..- „...: - • -,,,- •• • \' 'i. ' , . . . • -4__._ . . , . . , . -...._ .. . ... '1 • • . . -- - • •- if - . • - - ..1' ••' , .. . , .... ... • • __ - • •• - • -- - . - -4.- 1 4' • . .( . 9 - - • . - - •4. :;.t • $ 1 4, • t - ) •. 1- i ••-r” ••• A t . 1 1 it• " ' , r A .,,. . .4.,.. •_ • _ ... . _.... ,., . . • • I r: • ' • "'it-.-. -.,i ' e . ; • we. - •- - . 4 r .• ;7•4 • .. A ,. . ... . ... ' ' • • —........ r..• • ' •• a. 4--S i . •ir ._ ,. . • _. . .„• .•-• ' • :• _ ,. . . it ... IP •..) I ... • ,.. • —-' ft• - . 10 ,- '. SECTION V 34 SPECIFIC EXAMPLES - UNDERLIT This is an example of a very dark/underlit intersection in an area of the city that is mostly underlit.Available street lighting is either not working or obstructed by overgrown trees.Additional maintenance may provide better service in this area. If the City elects to install new LED street lights,properly designed lighting can alleviate these issues. ILLUMINANCE OVERLIT- UNDERLIT Oka !+M „ IP.7.', ; 2. r +1 •,4' ir'' ; iii 0 , e 011 ` " !un r oi--„. Mkt aryll I Yil Ia ,t r � r.i Wi . 4` I Eli .$as.. " IP" 1ill 19I ii mr y ler. ' +, �P .,:„,., l"" .. god' W. * e' 1041 , LEGEND LEGEND r Overlit Meets Standards Underlit 2.0+ 110 0.5 0 1.5 35 • -x UNDERLIT INTERSECTION 13TH & LENNOX SECTION IV SPECIFIC EXAMPLES(Continued) 36 SPECIFIC EXAMPLES — OVERLIT This shows an example of a technically overlit street.Given the location,land use,and pedestrian movement in the area, the City may elect to keep the lighting of the roadway at an elevated level for safety. ILLUMINANCE OVERLIT- UNDERLIT ° _ 110, 4144- t Ask i geig .A Mr kt - ilitil ilij. .. . _ !RI . ...t. .....„ . „cit. • • ,.....61 A. iris-wcr ,-- ., '—I it'44,1 I lif ...... ': j•jr, 4. 1 r. * , v. 4 ,� ti.. " 4 it l� ` .. .fir ,. p.._»-•'l SSSS�Ad+J ._ +�, w _� jP:. 11 b1Ml Y '4• - C .& _ si w�:..1.1 =- .K s I i' ►'"" ! �rosr wit •• - • ;i .. ¶` Z rid ,fir .. ^SIJ /pi f .1' . '/F } - •( " 1�� . LEGEND LEGEND *,4111111110 1111111111111111111111111111 age s of 2012 Overlit Meets Standards Underlit 2.0+ 1.5 1.0 0.5 0 ,-- _ . . • • • • r .. f i I it ..... ..., N . 01 . • . . II iii i .., 1... <,,,)t) .1,'':,!.:1;..•s'I '..,.4 i.... .. . It • 11 — i0.Lt, 1' 0 1 a IOIPtrr, 1i41i11i14.1:1:-C,•'i.„-'-, 4- q- ft4;• 1,i—• :._:. ..:.:. II -"Is•rI d 111 Aow I••••••11M/a ,mmiiz.,MO_D_ _. •.. 0, 41 , am 4•21,N,• 0 ..., .. .0,. ..40. :16•0 . - n RLIT INTERSECTION .., WASHINGTON AVE. (BETWEEN 12TH & 13TH) . - . . . . SECTION IV SPECIFIC EXAMPLES(Continued) 38 SPECIFIC EXAMPLES - POORLY UNIFORM This major roadway provides a good example of the importance of uniformity and properly designed lighting.While the lighting level is close to standard,the lighting mid-block is measurably lower(approximately 1.0 fc)than the lighting at the intersections.This is most likely caused by the fixture type(Post Top)and location(offset from roadway)along Ocean Drive as compared to the cobra head fixtures used to illuminate the intersections. This poor uniformity can lead to drivers having issues adjusting their eyes to higher levels of glare when entering brighter spaces.On a roadway with heavy pedestrian traffic,like Ocean Drive,this can lead to safety issues. ILLUMINANCEpp�� OVERLIT— UNDERLIT v .,. ,. ....,..„,„:„: ,.......„, ...„2, • ;.,...11..3 :111,,-401/4„..t.:,..- 4:;- IA .W fir .\ II' �. , ........:- . , 74-4''.. 4.14 ,41111 , ,-4045:4"4. s i ''. ". ,.At. 7'\_• . ' 'A el,,,, \ 1114 .1101711FN,'. `� a"* !! '�o - y�� "*. I�;INw yam, / "I' INr l , :4.: I. \,w \ ry'�r glig « 4 1 4 -•- .1141,L. ,./40411000 • , �, . M � . 15T+., M I� _ LI lul 111 l n ,J n ;,...,,.,,,...',..%• ...•� , « '� LEGEND LEGEND I • 1 J, ''14:'.":,: j:. lfc ® � I *OH : # r ,^ Overlit Meets Standards Underlit 2 Ci- 1.5 1.0 0.5 1) 39 r 1110 i � V ■ a .. 1h IP • POORLY UNIFORM INTERSECTION OCEAN DR. (BETWEEN 7TH & 8TH) SECTION VI 40 SUMMARY After a thorough review of the lighting conditions in Miami Beach, Citelum has reached a few general conclusions: 1) Only approximately 18.2% of the roadways (by mileage) fall within the assumed acceptable range for Illuminance and Uniformity when compared to standards 2) Expressways are either underlit or overlit, but in most cases display low uniformity 3) Major roadways can be underlit, compliant or overlit but in most cases the uniformity is low 4) The majority of surveyed collectors are underlit, however the uniformity is acceptable 5) A variety of issues can be observed on local roadways, with entire sections of the City that are overlit as well as specific underlit streets Page 1708 of 2012 • ... V I c.."'*1!';.- if‘• .„ 4 ' .• * - . .i.1'v•-. .• - " ' • • >aPt- . 4,.4s4. •.. -•(- :-_... ' '• •". ,• • .•.,•4, N..'..,‘,„.,.. ..",,....4 1••••1•1 •,„. 0; .- A p1 . , 0 / . N -•• . -. • • c 1 44 .. ..„,•-, _s .s • 1\s.*-.... I r-.-.-....„ st .i'' ' 4•1 ' .so" ... kW% , ,,. o ..... ,• 1Stt . .... .?„....,,". . • . _ ...„./ ..... .0.,.:......4 „klio: Ile.' 40 ' :1•••• I . . i., Agri ''...t: 40P I'"•.,': .' . " #114* . 1 7 , , Q. •4* i "i .7....; p...: , ''' : • : 'if ...., .. ... . 0,• .• . Ci..rev.d...„,..,„ . ' 16„,,,„..,-7,.•. ' 1: It: . " . '....i 1 ' L ..It orSli' • '- §P AaiTi 11"....0- I. "AL . A - 1:0141 j it •__,... ,.., .." ' -.. • , . , .yiti01 ,0 „- . 1; ' 110, ,..voll.,,S10%., •:, ..• • ::,:l'e..- , .fiWk.ktt . ttsoloi. , 44....., .,. ,.- , , . ...,,_ ....a. , tt . •:•....,:. t; .,N1 Alf liflilit.a..... "411. 4 Oe4S-* ik••"'°_, btbuy r'.. • - _ .... • ... , • . —,z„„„1„,‘ ,,,,,,....7„. . . , a. •,..t:.... ..,,,,..4i._...--,,,,,:_.• ..,..1„;,.-.41vo. . ./. . .. ...._ Air'-t-air c.iiirei,, - t...._- ' .*•.w . , , . • a• I , :I-V.4. - '''',:'' . . -•••:'-'wir- ........... ear'," '--•7,;....,..7--,,,ck...,,,, ,...... .' ..III '1'. ....air ..., ,..... ,„.... -, . , ,,, . .1,,t,f , 1 1 - . A -11'' ''.(ItRito, ."14 ., 11,-1 lit ....,-14$4460.; " - .' • ' - t--4- - - , ' ' t of, „ .ir. ' ''.'g-'7, • • ...-4.„ '..--; -- . • .,crer...4-- -AP 1 ' • • • ; I , "--• I, , - A .-...,.., • -, ' AniradiRl: -AlSwic -s s -Ara. '.."'isp,a,e -,:irS-•• •--. of",.-Air.-‘ . ,....s-.4.:„6.... •,„ , .,„OA - - - - . •-lai ''' '''-. •,... ....r, 11,-..,.. •:•-... , - , . , pi .._ . . 4, ,,,,..A.A.„„,,, ...,... .;,..:...... 41.••••4 .7.(171b,r -..'Ile. ...''4 ' '.4i. ' .44.1 •—tar — * ...- • . ".... •- -. 4. • - low :.ifr- "`• --'4'411 .,;•:.:I.:. -• .• -.at, ..41br.-. I e al .. . *.a .... .`Aar • • . 1%4- -.6.1E-dir --s. t-'' e•'-f? i .... f:. ••4*,,-..." ARM .-40A-..: ....Iii:-. • _ _.....-lt--, •_ - ., - • -2,.....4......7,4, ...loc.4,# . ....,:„.......4....p........ . ...,00., ....„,..:......... - .. . , - ,.. •. ---.1.-,--her „,„.. ... .. ..., .,--;;„....ar All. 11'"r--7 - 7ralAtigai •,1 4 ../111 • - - '•!-*.r.--'1' .7'.'" . -'' - . 4`.-Alhar., -Atlarrer- ,i. e- - - • aok,---PP; ' " „..4.1t* NIP ,.. • . .."--:. ... • -,...• 0-,-- .1k.-• '• "jy. w ..•.....i•-7' , - .'„..-11-.! :- '. •••• .1.4(.1. ''''..:_ ... ‘.4-.......A.k. _ ,_„ ".., "';" ....''''• ,':....• . , . ---- a' . . ____.;411;;;• ?.....1,AVEM..... „ah. it., ........... . . .• . -.. ....- , ‘iigii - '4'P".-- •46F--... ../-- „‘" ..---.Ze- - stiii .....m.d.0 -,,s ' .` .... ,.,__ * 4111411r8-., ' '''''a•-`• -- -f..• .i.- - ,,,'" • -..... , 1111 .,"..... . .,. .. - • • ), „mi.; . .t.„. lit - - •-.tok....i...,"•.........„.4„ ' - 0 Ar.-1 ital , - .-4.11--x-r- .::-.."- IN-; .4V;".•-"a"-F rb....••.1..... r . . . ...... '' • I tr , ' • '. , , _ • •-• ' • •s. (MP ' — "dr....-,4 - ...i./....-- - lite - - . ,... -iii--- - — - - .. • • • _ ..... ,71...Arzitif I= • - SECTION VI 42 GENERAL RECOMMENDATIONS Based on these findings, Citelum suggests the following: 1) The City should update their existing inventory of street lights to account for any information that is more than 5 years out of date 2) The City should work with industry to develop a Lighting Master Plan. This plan will define the lighting goals of the City, as performing only to standard may not best the best option for specific regions. For example: a. The City may choose to continue to over light the main tourist and commercial centers of the city b. The City should define a desirable lighting level for residential neighborhoods c. Working with Police Department and the Emergency Services,the City should identify areas within the city that should be over lit with the goals of crime prevention and increased safety Page 1710 of 2012 43 3) The City should improve the operation and maintenance services to address street light outages in proactive or preventative manner. This can be accomplished through a robust Computerized Maintenance Management System (CMMS), higher standards for O&M performance through Key Performance Indicators (KPIs), or the introduction of an advanced street light monitoring and control system 4) The City could include a remote control system on LED lights, setting a schedule for lighting levels. Specific areas can be kept bright when needed and adjusted during off-peak hours 5) The uniformity of street lighting within the City should be improved. This can be accomplished multiple ways: a. The city can investigate the possibility of adding additional street lights where needed and removing extraneous luminaires b. The city can investigate upgrading the existing street lights to LED. LED fixtures provide directed light and with proper design (distribution types, low back-light and glare, etc.) uniformity issues can be corrected ' f COR citelum ti GROUPE eDF Page 1711 of 2012 h IIIF. 41a ! �d+r0+�^l 0. 4. 10,1.' 'T k \ i .;,11 ''' 4' SIP/ ‘ , .. a1' r'f I:; ; rry l . 4 I h 1 „,"pis4,1 pi pii, ,t , , 1i N S^ I V Ill'h"l* r ryn l t q " ISN 'r 141'IY 1Ill'„lllpll gI14114 "11I 1 .II10 41 r , , 1 Ndl bl " r. l - F�.� r r#IG III y4k a F� r„ x� �it dl' �' P y �J.611Alk n:15�� 1�\1 Iliul ,":" ',..'1,41'',1' r •, . i / di 4 IN41�•I° ! lilt -�l" Si � r l hilllw IN'44 ;' 1 t '� I S � i u* v III IN 'qI�N.;u,, 3 k "1�1 '''':''1,14,,,' o . 1lll l 6 orf„, lio' 0...,'”,l'""L''',°:',..''' / 4,.''','1,1.11t 1' ! i "III'9'!I INI h�!L1N 111110 ci I m to u ifllIl Il �l���l ISI �M Ar GROUPE eDF N ia 9 , II W; dElKq A Iryf. n 02018— 3o , /2_ PROFESSIONAL SERVICES AGREEMENT BETWEEN THE AN OF MIAMI BEACH JOHNSON CONTROLS, INC. PHAE 1A SERVICES FOR SMART CITY STREET LIGHTING SYSTEM, PURSUANT TO REQUEST FOR QUALIFICATIONS NO. 2017-119KB This Professional Services Agreement(Agreement) is entered into this )-f day of ber, 2018, between the CITY OF MIAMI BEACH, FLORIDA, a municipal corporation organized and existing under the laws of the State of Florida, having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida, 33139 (the City), and JOHNSON CONTROLS, INC., a Wisconsin corporation, with an office at 15901 SW 29th Street #801 Miramar, Florida 33027 (Consultant). SECTION 1 DEFINITIONS Agreement: This Agreement between the City and Consultant, including any exhibits and amendments thereto. City Manager: The chief administrative officer of the City. City Manager's Designee: The City staff member who is designated by the City Manager to administer this Agreement on behalf of the City. The City Manager's designee shall be the Public Works Department Director. Consultant: For the purposes of this Agreement, Consultant shall be deemed to be an independent contractor, and not an agent or employee of the City. Services: All services, work and actions by the Consultant performed or undertaken pursuant to the Agreement. Fee: Amount paid to the Consultant as compensation for Services. Proposal Documents: Proposal Documents shall mean City of Miami Beach Request for Qualifications No. 2017-119KB for Smart City Street Lighting System, together with all amendments thereto, issued by the City in contemplation of this Agreement (the. RFP), and the Consultant's proposal in response thereto (Proposal), all of which are hereby incorporated and made a part hereof; provided, however, that In the event of an express conflict between the Proposal Documents and this Agreement, the following order of precedent shall prevail: this Agreement;the RFP; and the Proposal, Risk Manager: The Risk Manager of the City, with offices at 1700 Convention Center Drive, Third Floor, Miami Beach, Florida 33139; telephone number (305) 673-7000, Ext. 6435; and fax number(305) 673-7023. 1 Page 1713 of 2012 SECTION 2 SCOPE OF SERVICES 2.1 In consideration of the Fee to be paid to Consultant by the City, Consultant shall provide the work and services described under the heading Phase 1A in Exhibit "A" hereto (the Services). Although Consultant may be provided with a schedule of the available hours to provide its services, the City shall not control nor have the right to control the hours of the services performed by the Consultant; where the services are performed (although the City will provide Consultant with the appropriate location to perform the services); when the services are performed, including how many days a week the services are performed; how the services are performed, or any other aspect of the actual manner and means of accomplishing the services provided. Notwithstanding the foregoing, all services provided by the Consultant shall be performed in accordance with the terms and conditions set forth in Exhibit "A" and to the • reasonable satisfaction of the City Manager. If there are any questions regarding the services to be performed, Consultant should contact the following person: Roy Coley, Public Works Director City of Miami Beach 1700 Convention Center Drive Miami Beach, Fl 33139 2.2 Consultant's Services, and any deliverables incident thereto, shall be completed in accordance with the timeline and/or schedule related to Phase IA in Exhibit"A" hereto. 2.3 The following are exclusions, assumptions, exceptions and/or City responsibilities: • Pricing estimate for inventory assumes 9,000 lights. Price will be adjusted if actual • inventory exceeds this amount. • Current pricing excludes design of emergency and egress lighting systems, • Pricing assumes that other than meter upgrades, no design modifications will be required except replacement as necessary for the lighting circuits. • The City will provide the Consultant's team with maps of the City owned, operated, and maintained properties in scaled parcel maps or as-built drawings, either in PDF or CAD form. This scope does not include work on lands owned, operated, and maintained by private owners, nor does this scope include properties or public rights-of-way owned, operated, and/or maintained by other local, county, and state jurisdictions outside of the City of Miami Beach. It is also assumed this scope does not include the City leased- spaces, building, or lands where the City is not the owner, operator, or maintainer. • • Assumes lighting for analysis is all City-owned light fixtures, and excludes utility-owned lights and any other lights owned by other entities like state/county lights. Consultant !- assumes that all lighting falling under the jurisdiction of the City is included in this effort. This includes not only corridors, but all City-owned properties. 2.4 Execution of this Agreement only serves as notice to proceed with the scope of work associated with Phase 1A, as referenced in Exhibit "A' attached hereto. The Phase 1B and •• Phase 2 forms of contract will be negotiated between the parties utilizing Exhibit "A" attached 2 Page 1714 of 2012 hereto. Notwithstanding the foregoing or any other term of this Agreement, the City shall be under no obligation to proceed with any work or services beyond those services contemplated in Phase 1A of Exhibit "A", to this Agreement. Approval of any other work or services In Exhibit "A," including without limitation Phase 1B and Phase 2, shall be subject to the prior approval of the City Commission, which approval, if given at all, shall be at the City Commission's sole discretion. 4 SECTION 3 • TERM • The term of this Agreement (Term) shall commence upon execution of this Agreement by all parties hereto, and shall have an initial term of twelve(12) months. • Notwithstanding the Term provided herein, Consultant shall adhere to any specific timelines, schedules, dates, and/or performance milestones for completion and delivery of the Services, as same is/are set forth in the timeline and/or schedule referenced for Phase 1A in Exhibit "A" hereto. SECTION 4 FEE 4.1 In consideration of the Services to be provided, Consultant shall be compensated according to the price and payment terms referenced for Phase 1A in Exhibit "A" attached hereto. 4.2 INVOICING Upon receipt of an invoice, payment(s) shall be made within forty-five (45) days for that portion (or those portions) of The Services satisfactorily rendered (and referenced in the particular invoice). Invoices shall include a detailed description of the Services (or portions thereof) provided, and • shall be submitted to the City at the following address: City of Miami Beach Public Works Department 1700 Convention Center Drive Miami Beach, FL 33139 • Attn: Roy Coley, Public Works Director • 3 Page 1715 of 2012 SECTION 5 TERMINATION 6.1 TERMINATION FOR CAUSE If the Consultant shall fail to fulfill in a timely manner, or otherwise violates, any of the covenants, agreements, or stipulations material to this Agreement, the City, through its City Manager, shall thereupon have the right to terminate this Agreement for cause. Prior to exercising its option to terminate for cause, the City shall notify the Consultant of its violation of the particular term(s) of this Agreement, and shall grant Consultant thirty (30) days to cure such default. If such default remains uncured after thirty (30) days, the City may terminate this Agreement without further notice to Consultant. Upon termination, the City shall be fully discharged from any and all liabilities, duties, and terms arising out of, or by virtue of, this Agreement, provided that Consultant shall be paid only for those Services satisfactorily performed and accepted by the City prior to the effective date of such termination. Notwithstanding the above, the Consultant shall not be relieved of liability to the City for damages sustained by the City by any breach of the Agreement by the Consultant. The City, at its sole option and discretion, shall be entitled to bring any and all legal/equitable actions that it deems to be in its best Interest in order to enforce the City's rights and remedies against Consultant. The City shall be entitled to recover all costs of such actions, including reasonable attorneys'fees. 6.2 TERMINATION FOR CONVENIENCE OF THE CITY THE CITY MAY ALSO, THROUGH ITS CITY MANAGER, AND FOR ITS CONVENIENCE AND WITHOUT CAUSE, TERMINATE THE AGREEMENT AT ANY TIME DURING THE TERM BY GIVING WRITTEN NOTICE TO CONSULTANT OF • SUCH TERMINATION; WHICH SHALL BECOME EFFECTIVE WITHIN THIRTY (30) DAYS FOLLOWING RECEIPT BY THE CONSULTANT OF SUCH NOTICE. ADDITIONALLY, IN THE EVENT OF A PUBLIC HEALTH, WELFARE OR SAFETY CONCERN, AS DETERMINED BY THE CITY MANAGER, IN THE CITY MANAGER'S SOLE DISCRETION, THE CITY MANAGER, PURSUANT TO A VERBAL OR • • WRITTEN NOTIFICATION TO CONTRACTOR, MAY IMMEDIATELY SUSPEND THE • SERVICES UNDER THIS AGREEMENT FOR A TIME CERTAIN (IN WHICH CASE • TIME FOR PERFORMANCE SHALL BE EXTENDED TO ACCOUNT FOR THE DELAY CAUSED BY SUCH SUSPENSION), OR IN THE ALTERNATIVE, TERMINATE THIS AGREEMENT ON A GIVEN DATE. IF THE AGREEMENT IS TERMINATED FOR CONVENIENCE BY THE CITY, CONSULTANT SHALL BE PAID FOR ANY SERVICES SATISFACTORILY PERFORMED UP TO THE DATE OF TERMINATION; FOLLOWING WHICH THE CITY SHALL BE DISCHARGED FROM ANY AND ALL LIABILITIES, DUTIES, AND TERMS ARISING OUT OF, OR BY VIRTUE OF, THIS AGREEMENT. 5.3 TERMINATION FOR INSOLVENCY The City also reserves the right to terminate the Agreement in the event the Consultant is • placed either in voluntary or involuntary bankruptcy or makes an assignment for the benefit of creditors. In such event, the right and obligations for the parties shall be the same as provided • for in Section 5.2. 4 Page 1716 of 2012 SECTION 6 INDEMNIFICATION AND INSURANCE REQUIREMENTS 6.1 INDEMNIFICATION Consultant agrees to indemnify and hold harmless the City of Miami Beach and its officers, employees, agents, and contractors,from and against any and all third party actions (whether at law or in equity), claims, liabilities, losses, and expenses, including, but not limited to, reasonable attorneys' fees and costs, for personal, economic or bodily injury, wrongful death, loss of or damage to property, arising from the negligent acts, errors, omissions or other wrongful conduct arising from the negligent acts, errors, omissions or other wrongful conduct of the Consultant, its officers, employees, agents, contractors, or any other person or entity acting under Consultant's control or supervision, in connection with, related to, or as a result of the Consultant's performance of the Services pursuant to this Agreement. To that extent, the Consultant shall pay all such third party claims and losses and shall pay all such costs and judgments which may issue from any lawsuit arising from such claims and losses, and shall pay all costs and reasonable attorneys'fees expended by the City in the defense of such claims and losses, including appeals. The Consultant expressly understands and agrees that any insurance protection required by this Agreement or otherwise provided by the Consultant shall in no way limit the Consultant's responsibility to indemnify, keep and save harmless and defend the City or its officers, employees, agents and instrumentalities as herein provided. Notwithstanding anything to the contrary contained herein, neither Consultant nor the City of Miami Beach will be responsible to the other for any special, indirect, or consequential damages, including but not limited to loss of use of lost profits. The parties agree that one percent (1%) of the total compensation to Consultant for performance of the Services under this Agreement is the specific consideration from the City to the Consultant for the Consultant's indemnity agreement. The provisions of this Section 6.1 and of this indemnification shall survive termination or expiration of this Agreement. 6.2 INSURANCE REQUIREMENTS The Consultant shall maintain and carry in full force during the Term, the following insurance: 1. Consultant General Liability, in the amount of$1,000,000; 2. Consultant Professional Liability, in the amount of$200,000; and 3. Workers Compensation & Employers Liability, as required pursuant to Florida Statutes. The insurance must be furnished by insurance companies authorized to do business in the State of Florida. All insurance policies must be issued by companies rated no less than "B+" as to management and not less than "Class Vi" as to strength by the latest edition of Best's Insurance Guide, published by A.M. Best Company, Oldwick, New Jersey, or its equivalent. All of Consultant's certificates shall contain endorsements providing that written notice shall be given to the City at least thirty (30) days prior to termination, cancellation or reduction in coverage in the policy. The insurance certificates for General Liability shall include the City as an additional insured and shall contain a waiver of subrogation endorsement. Original certificates of insurance must be submitted to the City's Risk Manager for approval (prior to any work and/or services commencing) and will be kept on file in the Office of the Risk Manager. The City shall have the right to obtain from the Consultant specimen copies of the 5 Page 1717 of 2012 insurance policies In the event that submitted certificates of insurance are inadequate to ascertain compliance with required coverage. The Consultant is also solely responsible for obtaining and submitting all insurance certificates for any sub-consultants. Compliance with the foregoing requirements shall not relieve the Consultant of the liabilities and obligations under this Section or under any other portion of this Agreement. The Consultant shall not commence any work and or services pursuant to this Agreement until all insurance required under this Section has been obtained and such insurance has been approved by the City's Risk Manager. SECTION 7 • LITIGATION JURISDICTIONNENUE/JURY TRIAL WAIVER This Agreement shall be construed in accordance with the laws of the State of Florida. This Agreement shall be enforceable in Miami-Dade County, Florida, and if legal action is necessary by either party with respect to the enforcement of any or all of the terms or conditions herein, exclusive venue for the enforcement of same shall lie in Miami-Dade County, Florida. By entering into this Agreement, Consultant and the City expressly waive any rights either party may have to a trial by jury of any civil litigation related to or arising out of this Agreement. SECTION 8 LIMITATION OF CITY'S LIABILITY The City desires to enter into this Agreement only if in so doing the City can place a limit on the City's liability for any cause of action, for money damages due to an alleged breach by the City of this Agreement, so that its liability for any such breach never exceeds the sum of $10,000. Consultant hereby expresses its willingness to enter into this Agreement with Consultant's recovery from the City for any damage action for breach of contract to be limited to a maximum amount of$10,000. Accordingly, and notwithstanding any other term or condition of this Agreement, Consultant hereby agrees that the City shall not be liable to the Consultant for damages in an amount in excess of$10,000 for any action or claim for breach of contract arising out of the performance or non-performance of any obligations imposed upon the City by this Agreement. Nothing contained in this section or elsewhere in this Agreement is in any way intended to be a waiver of the limitation placed upon the City's liability, as set forth in Section 768.28, Florida Statutes. • 6 Page 1718 of 2012 . i SECTION 9 DUTY OF CARE/COMPLIANCE WITH APPLICABLE LAWS/PATENT RIGHTS; COPYRIGHT; AND CONFIDENTIAL FINDINGS 9.1 DUTY OF CARE With respect to the performance of the work and/or service contemplated herein, Consultant shall exercise that degree of skill, care, efficiency and diligence normally exercised by reasonable persons and/or recognized professionals with respect to the performance of comparable work and/or services. 9.2 COMPLIANCE WITH APPLICABLE LAWS In its performance of the work and/or services, Consultant shall comply with all applicable laws, ordinances, and regulations of the City, Miami-Daae County, the State of Florida, and the federal government, as applicable. 9.3 PATENT RIGHTS; COPYRIGHT; CONFIDENTIAL FINDINGS Any work product arising out of this Agreement, as well as all Information specifications, processes, data and findings, are intended to be the property of the City and shall not otherwise be made public and/or disseminated by Consultant, without the prior written consent of the City Manager, excepting any information, records etc. which are required to be disclosed pursuant to Court Order and/or Florida Public Records Law. All reports, documents, articles, devices, and/or work produced in whole or in part under this Agreement are intended to be the sole and exclusive property of the City, and shall not be subject to any application for copyright or patent by or on behalf of the Consultant or its employees or sub-consultants,without the prior written consent of the City Manager. SECTION 10 GENERAL PROVISIONS 10.1 AUDIT AND INSPECTIONS Upon reasonable verbal or written notice to Consultant, and at any time during normal business hours (i.e. 9AM — 5PM, Monday through Fridays, excluding nationally recognized holidays), and as often as the City Manager may, in his/her reasonable discretion and judgment, deem necessary, there shall be made available to the City Manager, and/or such representatives as the City Manager may deem to act on the City's behalf, to audit, examine, and/ or inspect, any and all other documents and/or records relating to all matters covered by this Agreement. Consultant shall maintain any and all such records at its place of business at the address set forth in the "Notices" section of this Agreement. ; 10.2 INTENTIONALLY DELETED 7 { Page 1719 of 2012 1 10.3 ASSIGNMENT, TRANSFER OR SUBCONSULTING Consultant shall not subcontract, assign, or transfer all or any portion of any work and/or service under this Agreement without the prior written consent of the City Manager, which consent, if given at all, shall be in the Manager's sole judgment and discretion. Notwithstanding the foregoing, the parties agree that Jacobs Engineering, infinite Source Communications, Hotwire Communications, Virginia Tech Transportation Institute, Levatas and Evari Consulting are approved subcontractors. Neither this Agreement, nor any term or provision hereof, or right hereunder, shall be assignable unless as approved pursuant to this Section, and any attempt to make such assignment(unless approved) shall be void. 10.4 PUBLIC ENTITY CRIMES Prior to commencement of the Services, the Consultant shall file a State of Florida Form PUR 7068, Sworn Statement under Section 287.133(3)(a) Florida Statute on Public Entity Crimes with the City's Procurement Division. 10.5 NO DISCRIMINATION In connection with the performance of the Services, the Consultant shall not exclude from participation in, deny the benefits of, or subject to discrimination anyone on the grounds of race., color, national origin, sex, age, disability, religion, income or family status. Additionally, Consultant shall comply fully with the City of Miami Beach Human Rights Ordinance, codified in Chapter 62 of the City Code, as may be amended from time to time, prohibiting discrimination in employment, housing, public accommodations, and public services on account of actual or perceived race, color, national origin, religion, sex, Intersexuality, gender identity, sexual orientation, marital and familial status, age, disability, ancestry, height, weight, domestic partner status, labor organization membership, familial situation, or political affiliation. 10.6 CONFLICT OF INTEREST Consultant herein agrees to adhere to and be governed by all applicable Miami-Dade County Conflict of Interest Ordinances and Ethics provisions, as set forth in the Miami-Dade County Code, as may be amended from time to time; and by the City of Miami Beach Charter and Code, as may be amended from time to time; both of which are incorporated by reference as if fully set forth herein. Consultant covenants that it presently has no interest and shall not acquire any interest, directly or indirectly, which could conflict in any manner or degree with the performance of the Services. Consultant further covenants that in the performance of this Agreement, Consultant shall not employ any person having any such interest. No member of or delegate to the Congress of the United States shall be admitted to any share or part of this Agreement or to any benefits arising therefrom. 10.7 CONSULTANT'S COMPLIANCE WITH FLORIDA PUBLIC RECORDS LAW • (A) Consultant shall comply with Florida Public Records law under Chapter 119, Florida Statutes, as may be amended from time to time. 8 Page 1720 of 2012 (B) The term ''public records" shall have the meaning set forth in Section 119.011(12), which means all documents, papers, letters, maps, books, tapes, photographs, films, sound recordings, data processing software, or other material, regardless of the physical form, characteristics, or means of transmission, made or received pursuant to law or ordinance or in connection with the transaction of official business of the City. (C) Pursuant to Section 119.0701 of the Florida Statutes, if the Consultant meets the definition of"Contractor" as defined in Section 119.0701(1)(a),the Consultant shall: (1) Keep and maintain public records required by the City to perform the service; (2) Upon request from the City's custodian of public records, provide the City with a copy of the requested records or allow the records to be inspected or copied within a reasonable time at a cost that does not exceed the cost provided in Chapter 119, Florida Statutes or as otherwise provided by law; (3) Ensure that public records that are exempt or confidential and exempt from • public records disclosure requirements are not disclosed, except as authorized by law, for the duration of the contract term and following completion of the Agreement if the Consultant does not transfer the records to the City; (4) Upon completion of the Agreement, transfer, at no cost to the City, all public records in possession of the Consultant or keep and maintain public records required by the City to perform the service. If the Consultant transfers all public records to the City upon completion of the Agreement, the Consultant shall destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. If the Consultant keeps and maintains public records upon completion of the Agreement, the Consultant shall meet all applicable requirements for retaining public records. All records stored electronically must be provided to the City, upon request from the City's custodian of public records, in a format that is compatible with the information technology systems of the City. (D) REQUEST FOR RECORDS; NONCOMPLIANCE. (1) A request to inspect or copy public records relating to the City's contract for services must be made directly to the City. If the City does not possess the requested records, the City shall immediately notify the Consultant of the request, and the Consultant must provide the records to the City or allow the records to be inspected or copied within a reasonable time. (2) Consultant's failure to comply with the City's request for records shall constitute a breach of this Agreement, and the City, at its sole discretion, may: (1) unilaterally terminate the Agreement; (2) avail itself of the remedies set forth under the Agreement; and/or(3) avail itself of any available remedies at law or in equity. (3) A Consultant who fails to provide the public records to the City within a reasonable time may be subject to penalties under s. 119.10. (E) CIVIL ACTION. (1) If a civil action is filed against a Consultant to compel production of public records relating to the City's contract for services, the court shall assess and award against the Consultant the reasonable costs of enforcement, including reasonable attorney fees, if: a. The court determines that the Consultant unlawfully refused to comply with •• the public records request within a reasonable time; and • b. At least 8 business days before filing the action, the plaintiff provided written • notice of the public records request, including a statement that the 9 ' Page 1721 of 2012 Consultant has not complied with the request, to the City and to the Consultant. (2) A notice complies with subparagraph (1)(b) if it is sent to the City's custodian of public records and to the Consultant at the Consultant's address listed on its contract with the City or to the Consultant's registered agent. Such notices must be sent by common carrier delivery service or by registered, Global Express Guaranteed, or certified mail, with postage or shipping paid by the sender and with evidence of delivery, which may be in an electronic format. (3) A Consultant who complies with a public records request within 8 business days • after the notice is sent is not liable for the reasonable costs of enforcement. (F) IF THE CONSULTANT HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE CONSULTANT'S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THIS AGREEMENT, CONTACT THE CUSTODIAN OF PUBLIC RECORDS AT: CITY OF MIAMI BEACH ATTENTION: RAFAEL E. GRANADO, CITY CLERK 1700 CONVENTION CENTER DRIVE MIAMI BEACH, FLORIDA 33139 E-MAIL: RAFAELGRANADO(a MIAMIBEACHFL.GOV PHONE: 305-673-7411 SECTION 11 NOTICES All notices and communications in writing required or permitted hereunder, shall be delivered personally to the representatives of the Consultant and the City listed below or may be mailed by U.S. Certified Mail, return receipt requested, postage prepaid, or by a nationally recognized overnight delivery service. Until changed by notice, in writing, all such notices and communications shall be addressed as follows: TO CONSULTANT: Mary-Suzanne Powell Area General Manager Johnson Controls, Inc. 15901 SW 29th Street#801 Miramar, FL 33027 ,. Marysuzanne.powell@jci.com TO CITY: City of Miami Beach 1700 Convention Center Drive Miami Beach, FL 33139 Attn: Jimmy Morales, City Manager 10 Page 1722 of 2012 City of Miami Beach 1700 Convention Center Drive Public Works Department Miami Beach, FL 33139 1' Attn; Roy Coley, Director COPY TO: City of Miami Beach 1700 Convention Center Drive Miami Beach, FL 33139 Attn: Raul Aguila, City Attorney Notice may also be provided to any other address designated by the party to receive notice if such alternate address is provided via U.S. certified mail, return receipt requested, hand delivered, or by overnight delivery. In the event an alternate notice address is properly provided, notice shall be sent to such alternate address in addition to any other address which notice would otherwise be sent, unless other delivery instruction as specifically provided for by the party entitled to notice. Notice shall be deemed given on the date of an acknowledged receipt, or, in all other cases, on the date of receipt or refusal. • SECTION 12 MISCELLANEOUS PROVISIONS 12.1 CHANGES AND ADDITIONS This Agreement cannot be modified or amended without the express written consent of the parties. No modification, amendment, or alteration of the terms or conditions contained herein shall be effective unless contained in a written document executed with the same formality and of equal dignity herewith. 12.2 SEVERABILITY If any term or provision of this Agreement is held invalid or unenforceable, the remainder of this Agreement shall not be affected and every other term and provision of this Agreement shall be valid and be enforced to the fullest extent permitted by law. 12.3 WAIVER OF BREACH A party's failure to enforce any provision of this Agreement shall not be deemed a waiver of such provision or modification of this Agreement, A party's waiver of any breach of a provision of this Agreement shall not be deemed a waiver of any subsequent breach and shall not be construed to be a modification of the terms of this Agreemert. i 1- 12.4 JOINT PREPARATION The parties hereto acknowledge that they have sought and received whatever competert advice and counsel as was necessary for them to form a full and complete understanding of all rights and obligations herein and that the preparation of this Agreement has been a joint effort of the parties, the language has been agreed to by parties to express their mutual intent and the 11 Page 1723 of 2012 resulting document shall not, solely as a matter of judicial construction, be construed more severely against one of the parties than the other. 12.5 ENTIRETY OF AGREEMENT The City and Consultant agree that this is the entire Agreement between the parties. This Agreement supersedes all prior negotiations, correspondence, conversations, agreements or understandings applicable to the matters contained herein, and there are no commitments, agreements or understandings concerning the subject matter of this Agreement that are riot contained in this document, Title and paragraph headings are for convenient reference and are not intended to confer any rights or obligations upon the parties to this Agreement. [REMAINDER OF THIS PAGE LEFT INTENTIONALLY BLANK] • • • 12 Page 1724 of 2012 IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by their appropriate officials, as of the date first entered above. FOR CITY: CITY OF MIAMI BEACH, FLORIDA ATTEST: By: �1 Y ..� City lerk Ci 1ana•- • Date: 12 /`t ii .4.2,Q \„ A ri n ,• FOR CONSULTANT: I S' '_ ;r:{;_,(}"1P`` r,'`.) 1 VSO 'CONTROLS, INC. r t •• (-0 ATTEST: .1" • ,,,,-1 * --�'r' '--:- .,.':‘7.-5 -1- 2-,CD.1-.' ;-'671 4-14—, - i— t_CerL ,- Ser,,,--Z ,,,,,z Rie,, e,../c ti Print Name and Title Fri Naim and Title • Ur -k}•e s s J �r�rr •-/-/2r61-e "262/ per Date: 12/I Z I I APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION di. City A. . 1--,1 it- 3r- li pate----- /ft, t`\stto\ngur\ngreement\jolmcon controls pse 10-12-18 doc.docx 13 Page 1725 of 2012 I EXHIBIT A — SCOPE OF SERVICES Phase 1A 1. Engagement Plan: Consultant shall develop and implement an engagement plan for communicating with City of Miami Beach stakeholders the need for smart street lighting; the benefits to the City of Miami Beach (City) related to improved public safety, equality of access, and revenue; and the preservation plan for unique neighborhood aesthetics. The engagement plan will include the following: (a) One (1) Ideation Session with City Staff, Public Safety Department, Environmental and Sustainability Department, IT Department, and Finance Department to discuss the plan and optimal areas of focus, key stakeholders, and technology requirements to be held at 1755 Meridian Ave. Consultant's responsibilities for the Ideation Session include: coordination of meeting, scheduling venue, calendar invites, draft invitation letter, securing RSVP of additional agency stakeholders, meeting material preparation, set up, breakdown and preparing meeting summary. The day long ideation session will gather key City stakeholders in a facilitated workshop setting to develop consensus around short-term and long-term priorities for implementation of smart City infrastructure, applications and services. Initial exercises will focus on defining measures of success and prioritizing needs based on importance to the City. The workshop will then evaluate and prioritize future smart City capabilities based on their impact to City operations (efficiency, productivity, and cost) and impact on the community (services, safety, sustainability, and resilience). The workshop will close with a discussion of next steps and required actions. (b) Organize maximum of ten (10) meetings with City representatives or stakeholders, HOAs, and committees. Any additional Ideation sessions requested by the City will be billed on a Time and Material basis. This task will involve Consultant securing a place on a City Commission meeting, and may also require a presentation before the Design Review Board (DRB) or Historic Preservation Board (HPB) as an informational item. Final approval of the design shall require DRB and HPB approval, as quasi-judicial applications filed by the City. In order for Consultant to schedule meetings, the City will provide required information and assistance to be included on the agenda for the respective meetings. Consultant's responsibilities for this task includes: o Project research and development of stakeholder list. o Identify and research technical groups and general public. o Develop participation list and outreach timeline. o Research and provide list of key stakeholders, agency representatives, community groups, general public. o Coordination of meeting, scheduling venue, calendar invites, draft invitation letter, securing RSVP of additional agency stakeholders, meeting material preparation, set up, breakdown and preparing meeting summary. 0 (c) Conduct six (6) Smart Street Lighting Plan informational presentation sessions including Page 1726 of 2012 experts from the Illumination Engineering Society, Johnson Controls Lighting Engineers, Virginia Tech Transportation Institute experts, Connectivity Engineers from Hotwire Communications, Jacobs, Levatas; facilitated by Infinite Source Communications. Informational presentation sessions will be held at City determined locations on mutually agreed dates and times. To be held at Miami Beach determined locations on mutually agreed dates and times - two in North Beach, two in Middle Beach and two in South Beach. Consultant's responsibilities for the presentation sessions include: identifying/securing meeting site, advertisements/announcements, sign-in sheets, name tags, audio recording. (d) Technical Review Committee - Coordination, set up and follow-up. Conduct three (3) Technical Review Sessions with appointed elected official representatives, technical experts, key stakeholders, and agency representatives to discuss: Purpose and need (meeting 1); Alternatives (meeting 2); and Final plan (meeting 3). Final Plan Meeting is held to receive feedback in conjunction with the public. (e) Develop messaging to City Residents on the need for smart street lighting and technology infrastructure within the City via internet broadcasts, social media messaging, email, and mailed flyers; including messaging on dates and locations for informational presentation sessions. (f) Develop and identify property commercial and residential owner list, confirm contact information and property pull from Miami Dade Property search and delivered electronically to the City. Key Deliverables during this task: Ideation Session with Recommendations to Implement in Phase 2 o Discussion items considered that will be promoted further, listed in priority order; o Discussion items considered and rejected with no further consideration; o Qualitative matrixed evaluation scoring of each of the criteria outlined in the Ideation Scope; Informational & Key Stakeholder Presentation Sessions o Copies of formal presentations for record purposes; o Discussion items considered that will be promoted further, listed in priority order; o Discussion items considered and rejected with no further consideration; Smart Street Lighting Plan informational presentation sessions Technical Review Sessions o Discussion items considered that will be promoted further, listed in priority order; o Discussion items considered and rejected with no further consideration; Collateral and Messaging for Residents o Copies of collateral that will be distributed to the Residents; o Plan of the means and methods for messaging to the Residents; Page 1727 of 2012 2. Urban Lighting Inventory This Agreement covers work within the current boundaries of City-owned properties and corridors in which the City controls, oversees, and maintains all lighting equipment of conduit, fixtures, poles, and other power supply equipment. The City shall confirm City boundaries with Consultant prior to work commencement. Lighting Plan scope includes the following tasks: Perform Urban Lighting Inventory Phase 1a Project Execution plan /Timeline Perform Urban Lighting Inventory Consultant shall complete an inventory of existing City- and Florida Power & Light-owned lighting pole/fixture locations and light fixture type for the 169 miles of City roadways, along with municipal-owned landmarks, buildings, structures, and public corridors within the public parks, City boardwalk, public schools and youth centers located within the City using the existing City database. The following data will be collected (as applicable or available): GPS location of each asset Asset ID number (if present) Asset owner (City or utility) Pole type, height, and material Arm type and material Fixture type Lamp type and wattage Type of service (e.g. overhead, underground) Condition of pole/arm/fixture/lamp Photos of each asset including any existing damage Cross referencing existing database information for accuracy Key Deliverables for Lighting Inventory: Perform a 100% street lighting system inventory up to a maximum of 9,000 poles, providing a Microsoft Excel workbook or CSV file containing the available data points for each asset as described herein to the extent the data exists or can reasonably be ascertained 3. Develop Citywide Lighting Standards Once the inventory is completed, the Consultant will use the inventory of the existing urban lighting system and the available data from City's lighting photometric analysis to frame the development of a citywide lighting standard. This scope assumes the following land use types will fall within the boundaries of this scope. The City will confirm the inclusion of these land use types, or others such as the City owned, operated, and maintained property within mixed-use land uses, prior to finalizing work plan and approaches by the Consultant. Page 1728 of 2012 • City owned, operated, and maintained public right-of-way corridors which contain the City owned, operated, and maintained lighting infrastructure. • City owned, operated, and maintained site lighting around buildings and facilities within Civic and Government Use and the Convention Center District. • City owned, operated, and maintained parking facilities and open space within public right-of-way corridors, Civic and Government Use and Convention Center District land uses, covering exterior lighting infrastructure. The Consultant's approach to developing citywide lighting standards will utilize as a governing standard the practices recommended by the Illuminating Engineering Society of North America (IESNA) to address sustainable lighting strategies that provide greater connectivity among the City's specific neighborhoods, historic districts, and targeted economic centers and will consider feedback received from the public outreach in the Engagement Plan. This scope covers the development of lighting standards for the following zoning districts: Corridors —Arterial, Collector, Local (3 types) Parking Hospital District Civic and Government Use/Parks Convention Center District Multifamily, Planned Residential Development Districts Waterway Districts The Consultant will also confirm neighborhoods, historic districts, or specific zoning districts deemed as economic activation zones with the City, or other areas where special consideration must be given for lighting standards that are not covered above or having overlapping zones such as historic districts, environment preservation areas, or transit corridors. This scope assumes up to four (4) of these specialty lighting standards will be developed. The lighting standards will include the following information: • Background and Purpose o Vision o Mission o Guiding Principles or Goals • Luminaire Specification o Light sources o Color temperature and color rendering index o Luminaire specific attributes • Lighting Design Criteria o Introduction o Zoning district classifications Page 1729 of 2012 o Lighting Design and calculation approach and requirements o Specialty lighting standards Preliminary Standards will include complete information as listed above. Final standards will incorporate comments from Miami Beach on the Preliminary Standards submittal. Key Deliverables for Citywide Lighting Standards: Informational Meetings Preliminary (50%) Citywide Lighting Standards Final (100%) Citywide Lighting Standards Lighting map to illustrate lighting zones and needs suitable for presentation to City stakeholders. Map to be provided in an electronic format. Lighting design criteria and luminaire specifications 4. Develop Urban Lighting Approach Perform a Citywide lighting analysis to identify existing lighting levels and deficiencies. Using this analysis, along with the development of citywide lighting standards, the Consultant will apply these standards and research to develop a citywide plan to upgrade the existing urban lighting system. Key Deliverables during this task: Submit preliminary Urban Lighting Analysis Report. Report will include: o Street lighting inventory o Analysis of existing lighting levels o Identification of areas with deficient lighting compared to existing national standards Submit final Urban Lighting Analysis Report. Report will include: o Street lighting inventory o Analysis of existing lighting levels o Identification of areas with deficient lighting compared to new Citywide Lighting Standards o Recommendations for lighting level changes to comply with new Citywide Lighting Standards 5. Revenue Generation (a) Consultant will identify the preliminary costs for implementation and an indicative range of potential revenue generation for smart City technologies and services. Potential revenue generating options include: Page 1730 of 2012 1. Leasing space on vertical assets — The market value for the City's vertical assets (light poles) cannot be fully established until the Smart Street Lighting design, specification and Request for Proposal documents are completed and market competitive proposals are received and evaluated compared to the RFP. Per State Statute, the models will nominally reflect $150 annually per pole to deploy small cell technology until such time that the City advises otherwise. Deployment and leasing shall be consistent with State law. Chapter 337, Florida Statutes. 2. Public WiFi — Utilizing the Smart Lighting grid wireless access could be made available. There are several companies in the market that will operate this service for the right to sell advertising. 3. High speed data networks / streaming services — By including a fiber optic network in the Smart City plan the City will have the potential to lease space for network. There are several scenarios that would generate ongoing revenue for the City. 4. Data APIs and Actionable Insights - The Design and Data teams anticipate, depending upon the design and applications selected by the City, an opportunity to market several distinct data sets to local small businesses as well as corporations which consume such data and insights. These opportunities with be presented to the City for consideration however there will be no plans or modeling for data collection without written direction from the City. (b) Preliminary Financial Plan and Models will include the following tasks: (1) Connectivity Monetization Strategy. The Consultant will perform a high-level assessment of wireless connectivity in the City, which will inform the basis for monetization from wireless carriers from installation of network nodes associated with densification and future 5G buildouts. The Consultant will: o Create a preliminary financial model based on monetization of network from wireless carriers. This financial model will be based on a work product including a high level heat map analysis of wireless network deficiencies in City, conversations with wireless carriers regarding wireless augmentation plans in City, and internal network analysis based on current small cell deployments. (2) Preliminary data monetization recommendations: o Identify candidate technologies, market data need, and best practices for aggregation, storage, and syndication o Identify target customers o Connect data availability to potential use cases and business logic o Establish short-term and long-term priorities for data usage o Identify vendor list for audit based off use cases o Evaluation all existing data sources, and data sources identified in the ideation session, for opportunity value, data quality/availability, and ease of integration (3) Preliminary Financial Plan and Models will include the following tasks: Data monetization recommendations o Initiate negotiations with target customers o Map out governance roadmap for data quality, master data management, and key governance use cases (4) Updated Connectivity Monetization Strategy. o Preliminary financial model based on monetization of network from wireless Page 1731 of 2012 carriers. Financial Model will include details regarding the estimated number of poles that are likely to be leased to wireless carriers and an absorption model based on their network augmentation over the next five (5) years. During Phase 1 a, Consultant will combine the cost and revenue forecasts into a preliminary financial model to provide the City with options for investment and revenue generation consistent with the City budget and risk objectives. Consultant will work with the City to secure non-binding agreements for the revenue generating features that are included in the final design. Key Deliverables for during these tasks: • Submit Preliminary (Order of Magnitude) Revenue Generation Plan and Models o Smart City applications/services with associated network requirements, estimated costs, and revenues o List of potential technologies and market value o List of potential data customers o Preliminary revenue forecast models Should the City, through its City Commission, elect to move forward upon completion of Phase IA, the following scopes will be addressed in subsequent Phases: Page 1732 of 2012 Phase 1B 6. Computerized Maintenance Management System (CMMS) for urban lighting assets The Consultant Team will develop the criteria for the lighting system CMMS and select an appropriate product for implementation in Phase 2. The main function of the CMMS will be to enable status monitoring and management of the lighting system with real-time notifications of changes including light fixture malfunctions, alerts, updates, upgrades, and quality service monitoring. The CMMS will be compatible with the streetlight NEMA 7-pin receptacle and provide real-time monitoring capabilities of street light performance, control dimming and on/off of the light fixture. Key Deliverables for CMMS for urban lighting assets: • Submit Preliminary CMMS report. This report will include technology options, system capabilities and limitations, and preliminary cost estimates. • Submit final CMMS report. This report will include final CMMS system selection, specifications, and firm pricing. 7. Preliminary Upgrade Plan and Construction Plans for Architectural and Street Lighting Design Upgrades The Consultant team will develop preliminary lighting system upgrade plans which will include typical land use and neighborhood-specific street lighting design documents. This process will include the following tasks: 1. Inventory data from Task 2, Urban Lighting Inventory, will be imported into a relational database. 2. Using Consultant's customized, open platform, and project-specific GIS (Geographic Information System) mapping software, the locations of each fixture will be mapped out graphically with pins depicting each fixture/pole in the City's street light inventory. 3. The GIS software data will be exported in a format such that manufacturers can design fixture replacement options. 4. Photometric designs will be created for each proposed manufacturer's fixture design(s) for up to (5) five typical representative corridor types including: roadway, intersection, and sidewalk conditions, as well as up to (5) five typical representations of municipal owned spaces such as: parking lots, park and open space pathways, and other City- owned civic spaces. 5. The GIS software database will then be used during the Phase 2 implementation as a construction management program for the citizen of City, the City stakeholders, and the Consultant team to provide real-time updates on the project status and scheduling. 6. This stage will also include sample installations/mockups of no greater than (10) fixtures in each of four (4) separate City locations (maximum of 40 total fixtures). Specific Page 1733 of 2012 locations will be determined in collaboration with the City. Mockups will be performed in accordance will all applicable code requirements. am. f` • • 4.i t.d'. •atatio t I. +III 14 •mir ` „t �• .,� ' te + j' ; • . ' �' s ..s • . ? tt►` . M ' , �' L • Luminaire schedules and luminaire specification sheets will be incorporated for architectural mounting details. Luminaire and controls budgets will be prepared by the Consultant team to develop a basis of design report, which will include citywide standards and branding opportunities and present findings of the urban lighting analysis. The basis of design report will advance recommendations that will help advance the City's initiatives around carbon and overall energy conservation, public safety, walkability and transit, aesthetics, economic development and transit-oriented development, as well as connectivity with the ability to develop a smart platform of smart City technology implementation. Key Deliverables for Preliminary Upgrade and Construction Plans: • Submit Preliminary (50%) Lighting Design Deliverables o Preliminary KMZ map file showing fixture inventory with GIS location information o Microsoft Excel workbook or CSV file detailing existing inventory data collected during Urban Lighting Inventory task along with proposed luminaire replacement options and associated specifications. o Preliminary photometric designs for up to ten (10) typical roadway types and municipal owned spaces using IES files from selected LED manufacturer luminaires. o Relational database access and user accounts will be provided for City-specified individuals Page 1734 of 2012 o Install Mockups to include no greater than ten (10) fixtures in each of four (4) separate City locations • Submit Final (100%) Lighting Design Deliverables o Final KMZ map file showing fixture inventory with GIS location information o Microsoft Excel workbook or CSV file detailing existing inventory data collected during Urban Lighting Inventory task and final selected LED manufacturer fixture specifications and manufacturer data sheets. Final photometric designs for selected LED manufacturer luminaires in up to ten (10) typical roadway types and municipal owned spaces using IES files from selected LED manufacturer luminaires 8. Smart City Roadmap Consultant Team, in collaboration with the City, will define the vision, goals, and objectives for future the City smart City services. We will also identify which smart cities services are applicable to the City (Smart parking, Traffic management, Emergency response, Air quality and sound sensors, Electric vehicle charging stations, Security cameras, Citizen Engagement) and use City-defined threshold metrics to develop initial quantities and locations of each type of device. It is expected that multiple potential solutions (protocols, networks, etc.) will be identified. To identify the preferred solution, we would hold a third workshop to define decision analysis criteria and weighting schemes to be used in a decision analysis and dynamic feasibility model. Once the preferred solution is identified, the Consultant Team will develop an integrated Smart City Implementation Plan that includes project timing, interdependencies, and financial impacts that best meets the City goals and aligns with funding and data monetization expectations. The development of the Preliminary Smart City Roadmap includes the following activities: • Kickoff workshop to verify zoning districts, smart City services, and network requirements to include in the assessment. Two additional workshops with the City stakeholders to identify potential smart City services across the City. These workshops are in addition to the other meetings listed elsewhere in this scope of work. • Development of up to 10 smart City applications/services. Development will include network and bandwidth requirements, preliminary deployment schedule, order of magnitude costs (purchase, installation, and ongoing operations and maintenance), and order of magnitude revenue forecasts (for revenue generating concepts only). • The Consultant Team will determine the quantities/locations of sensors for up to 5 and the balance will be developed with the City provided sensor quantities/locations. • Up to 9 zoning districts will be defined to be applied across the City. These will be used to generate a composite of smart City applications and services for the City. Page 1735 of 2012 • Assist the City in the development of threshold metrics to evaluate potential smart City services developed by the full project team including other subcontractors. • Development of a decision analysis and dynamic feasibility model to rank potential applications in terms of best value to the City. This model will take into account the developed threshold metrics, estimated costs, and estimated revenue streams. This model will also incorporate the ability to compare, in real-time, multiple scenarios to understand potential trade-offs between services, quantities, and network options. • Development of Preliminary technical network architecture o Create a reference architecture for data aggregation, data mining and data storage o Create a reference architecture for data syndication for internal and external stakeholders o Preliminary recommendations for the use of machine learning • Preliminary Report detailing the results of the preliminary Smart City Roadmap. This Report will address the following topics: o Introduction o City Smart City Service Priorities —from Ideation and Kickoff meetings o City Smart City Service Applications and Services (up to 10) o Smart City Applications and associated Network Requirements o Zoning Districts (up to 9 from Citywide Standards) including GIS maps showing zoning districts across the City o Public, City owned and pre-defined threshold metrics used to select device type and locations o Workshop Process and Summary of Results o List of Smart City Services (Quantities, Locations, Network Impact) o GIS maps, in the form of a shape file, showing smart City applications/services across the City o Table listing type, number and location of smart City devices o Revenue Calculations o Initial Capital Cost, installation and Operation & Maintenance (O&M) cost o Decision Analysis Process Description o Smart City Services Prioritization and Decision Analysis Criteria o Workshop Process and Summary of Results Page 1736 of 2012 Deliverables: • Up to 10 smart City applications/services with associated network requirements, estimated costs, and revenues • City Threshold Metrics • Financial decision model and analysis results • Preliminary network architecture diagram and reference architecture • 3 Smart City Roadmap workshops and meeting notes • Preliminary Report Final Smart City Roadmap The development of the Final Smart City Roadmap includes the following activities: • Development of detailed hardware, data, network, and project requirements. This also includes the identification and evaluation of potential vendors and manufacturers of major system components. • User Interface and User Experience development o Develop materials for presentation to Miami Beach including presentations, prototypes and mockups • Technical architecture o Final recommendations for the use of machine learning o Develop syndication strategy • Development of a Final Smart City Roadmap Report. This Report will include the following: o Introduction o Miami Beach Smart City Service Priorities —from Ideation and Kickoff meetings o Miami Beach Smart City Service Applications and Services (up to 10) o Updated Smart City Applications and associated Network Requirements o Zoning Districts (up to 9 from Citywide Standards) including GIS maps showing zoning districts across the City o Threshold metrics used to select device type and locations o Workshop Process and Summary of Results o Updated List of Smart City Services (Quantities, Locations, Network Impact) o Updated GIS maps, in the form of a shape file, showing smart City applications/services across the City o Updated Table listing type, number and location of smart City devices o Updated Revenue Calculations o Updated Capital Cost, installation and O&M cost o Decision Analysis Process Description o Smart City Services Prioritization and Decision Analysis Criteria o Workshop Process and Summary of Results o Preferred Smart City Solutions o Options analysis of Preferred Smart City Solutions Page 1737 of 2012 Deliverables • Network and system requirements for final selected applications • Prototype and mockup of User Interfaces and User Experience • Updated operations and maintenance estimates for each selected application • Development of the Final Smart City Roadmap Report 9. Connectivity Scope The Consultant team will design a fiber optic network to interconnect each of the City light poles which will become the foundation of future smart City applications. The preliminary network design will include: o Analysis of current utility easement locations. o Walk out proposed fiber routes to determine installation routes based on existing infrastructure and other utilities o Identifying location of vault for each pole for fiber splice point access o Coordinating with City Officials regarding interconnection to any City buildings to be included as part of the network design. Key Deliverables for Preliminary Connectivity Scope: • List of City buildings to be connected to the future network • Preliminary network installation map showing proposed fiber routes. The final network design will include: o Completing a schematic level CAD engineering drawing of fiber route to connect fiber network to smart node locations as determined by density analysis. This drawing will include the major routing between network locations. o Creating a high level permit plan based on the network design with particular sensitivity to non-Miami Beach approvals needed in the network build including Department of Transportation (DOT), Army Corps of Engineers, FPL among other asset stakeholders located in Miami Beach and identify all required permits. Permit drawings and packages will not be included in Phase 1. This work will provide the information necessary to create a budget and a timeline for installation based on permitting as a gating factor in installation. o Creating a time schedule for deployment of the fiber network based on the number of route miles and lead time associated with construction, specifically noting areas governed by non-Miami Beach governing bodies (i.e. Department of Transportation). Key Deliverables for Final Connectivity Scope: • Schematic level CAD engineering drawing • Time schedule for deployment of the fiber network including permit timeline and construction analysis 10. Financial Scope Page 1738 of 2012 • Prepare cost savings analysis utilizing energy, operational, maintenance, and capital cost avoidance savings. • Calculate and provide estimated environmental impacts, such as greenhouse gas reductions and equivalencies (trees planted, cars removed from road,) resulting from the LED street lighting conversion. Impacts will be calculated based on the estimated kWh reduction using conversion factors provided by the US EPA, US DOE, and/or other sources. • Prepare options for the City revenue generation utilizing Smart City Services included in the final design. Consultant will also assist the City in negotiating and securing contracts with the vendors that will provide these services. • Project savings to be considered are as follows: o Electrical consumption (kWh), Electrical Demand (kW, on- and off-peak) o Utility savings, marketing, distribution, and/or delivery costs o City material/commodity costs o Maintenance labor Costs o Existing contract cost savings throughout the project term or other cost savings attributable to the City's behavioral modifications, operating schedule, or efficiency/sustainability plan o Escalation rates for utilities, commodities, labor, maintenance, and material shall be the greater of 3% annually or the Consumer Price Index (CPI) o Utility rate structure adjustments (rate category change) o Deferred maintenance reduction and/or emergency repair costs o Capital Improvement Budget funds, capital contribution funds, and/or offset of future City costs o Utility Provider and/or State or Federal rebates or grants Key Deliverables for Financial Scope include a specific list of Improvement Measures with the following information: • Final (100%) Financial Plan and Model o Updated Revenue forecasts for the income-generating Smart City Applications selected during the Smart City Roadmap process o Updated implementation and operating costs o Updated customer list and negotiation results o Updated connectivity revenue model • Final savings calculations for energy, environmental impacts, operational, other savings for the smart street lighting project. • Cost data and all other project related costs that will be used in the contract on a not to exceed cost basis. • Draft version of the "Phase 2 Implementation Contract" for negotiation of final terms and conditions with the City. Page 1739 of 2012 • Delivery of a written final business case and design for smart street lighting based on a guaranteed maximum price to install the Phase 2 street lighting and connectivity infrastructure. • Include a Net Present Value Analysis utilizing the specified ranges of revenue enhancement the City may experience: o Base project Add Alternate of Technology#1 o Add Alternate of Technology #2 o Add Alternate of Technology#3 11. Records, Data, and Assistance During Phase 1, the City will furnish to Consultant upon its request, accurate and complete data concerning current costs, budgets, lighting requirements, future projected loads, operating requirements, collective bargaining agreements, and other information as requested. More specific information requested by Consultant is included in Appendix A. Consultant will provide a separate document with the required information and the City shall make every effort to provide that information within five (5) calendar days of request. The City agrees to provide its complete cooperation in assisting Consultant in conducting and completing its Work in order to facilitate the City's review and approval and effectively manage cost and risk. Phase 2 12. Preparation of"Implementation Contract" Along with the other Scopes of Work required under this Agreement, Consultant will develop the framework of the subsequent Implementation Contract and the Financing Agreement, if applicable. These agreements shall be co-developed by Consultant and the City during Phase 1. These documents will vary dependent upon the City's desired structure, but where possible shall be standardized Consultant documents for most expedient delivery. Scope Items anticipated for Phase 2 to be addressed in the Implementation Contract: • Construction plan and associated costs for Implementation • Preliminary Electrical, Mechanical Performance and Maintenance Plan: o General overview of a Maintenance Plan for the Project. o Resources, including equipment, facilities, materials and staff necessary and available. o Work, methods, and procedures specific to the different tasks, including innovative techniques and practices. • Description of the CMMS system and associated implementation plan • Quality Management: Page 1740 of 2012 o Quality policy and quality control regime for design quality management, construction quality management, operations and maintenance quality management. o Processes for nonconformance review and disposition, including the approach for the development of a nonconformance Tracking system, its required components and corrective and preventative action response strategies for non- conformances. o Approach to interface key management activities (such as design, construction, operations, maintenance, etc.) with each other and with the quality management system, including the reporting and internal governance within and between all activities. o Quality management process for technologies used for this project • Project Management: o Safety Management including detailed narrative, charts, pictures and other representations that describe how Consultant intends to address work zone safety, worker protection, public safety, emergencies, and disasters o Traffic Management including detailed narrative that describes the approach to managing public and construction vehicle traffic during the Project term. Consultant shall describe traffic control provisions, specific to the project, which will demonstrate an understanding of relevant traffic standard, Consultant obligations and a description of key procedures and necessary resources. o Risk Management - Consultant shall provide a detailed narrative that describes: Any potential issues or risks that may affect the progress, implementation or success of the Project. o Company mitigation techniques and procedures • Financial plan for Implementation of Phase 2 Page 1741 of 2012 1. Phase 1 -Price and Payment Terms Pricing and Fees for Phase 1 Services Client agrees to pay to Consultant for the services outlined in the following Payment and Deliverable Schedule: Phase 1A Tasks Date j Payment IAmount Phase 1A Mobilization 11/19/18 $465,974 Project Management and Engagement Plan: Kickoff Meeting 11/28/18 $42,195 Phase 1 Project Execution Plan /Timeline 12/5/18 $21,186 (1) Ideation Session with Recommendations to Implement in Phase 12/28/18 2 $69,052 I (10) Informational & Key Stakeholder Presentation Sessions 2/15/19 $275,370 (6) Smart Street Lighting Plan informational presentation sessions 2/15/19 $207,659 (3) Technical Review Sessions 1 2/15/19 $77,217 Collateral and Messaging for Residents 2/22/19 $31,567 Perform Urban Lighting Inventory and Analysis Perform a 100% street lighting system inventory (up to a maximum 2/15/19 of 9000 poles) $184,218 Submit Preliminary (50%) Urban Lighting Analysis Report 3/1/19 $45,173 Submit Final (100%) Urban Lighting Analysis Report 3/15/19 $18,147 Review of Urban Lighting Analysis Report w/City Manager's Office 3/29/19 $7,296 Develop Citywide Lighting Standards Develop Preliminary (50%) Citywide Lighting Standards 1/31/19 $75,035 Develop Final (100%) Citywide Lighting Standards 2/15/19 $42,528 Review of Citywide Lighting Standards Report w/ City Manager's 2/22/19 Office $8,244 Develop Urban Lighting Approach and Design Install Mockups to include no greater than 40 fixtures in four 3/22/19 separate City locations $35,636 Submit Preliminary (50%) Operations and Energy Efficiency Report 4/19/19 $52,394 Submit Final (100%) Operations and Energy Efficiency Report 5/3/19 $32,719 Review of Operations and Energy Efficiency Report w/ City 5/17/19 Manager's Office $8,684 Revenue Generation and Financing Submit Preliminary (Order of Magnitude) Revenue Generation Plan 5/17/19 $163,601 , Page 1742 of 2012 and Models Phase 1A Total $1,863,895 Phase 1B Tasks Date Payment Amount Phase 1B Mobilization 7/1/2019 $293,613 Design a Computerized Maintenance Management System (CMMS)for urban lighting assets. Submit Preliminary CMMS design 8/9/19 $25,997 Submit final CMMS design 9/6/19 $15,346 Review of CMMS design w/City Manager's Office 9/20/19 $6,121 Preliminary Upgrade Plan and Construction Plans for Architectural and Street Lighting Design Upgrades Submit 50% Lighting Design Deliverables _ 8/9/19 $17,248 Submit 100% Lighting Design Deliverables ` 9/6/19 $14,015 Review of Lighting Design Deliverables Package w/ City Manager's 9/20/19 Office $4,315 Revenue Generation and Financing Submit Final (100%) Financial Plan and Models 9/6/19 $49,690 Review of Final (100%) Financial Plan and Models w/ City 9/20/19 Manager's Office I $16,747 Smart City Services Roadmap Draft (50%) Implementation plan 8/23/19 $145,956 Final (100%) Implementation plan 9/6/19 $87,030 Review of Final (100%) Implementation Plan w/ City Manager's 9/20/19 Office $21,074 Connectivity Scope: Submit Preliminary (50%) Connectivity Design Package 8/23/19 $215,953 Submit Final (100%) Connectivity Design Package 9/6/19 $130,384 Review of Final (100%) Connectivity Design Package w/ City 9/20/19 Manager's Office $25,106 Financial Scope: Final savings calculations for energy, environmental impacts, 10/4/19 operational, other savings for the smart street lighting project. $37,789 Cost data and all other project related costs that will be used in the 10/4/19 contract on a not to exceed cost basis. $24,855 Draft version of the "Phase 2 Implementation Contract" for 10/4/19 negotiation of final terms and conditions with the City. { $11,882 Delivery of a written final business case and design for smart street 10/4/19 lighting based on a guaranteed maximum price to install the Phase $24,855 Page 1743 of 2012 2 street lighting and connectivity infrastructure Review of Final Deliverables and Implementation Contract w/ City 10/4/19 Manager's Office $6,477 Phase 1B Total $1,174,452 Phase 1A & 1 B Total $3,038,347 Page 1744 of 2012