Resolution 2021-31860RESOLUTION NO. 2021-31860
A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF
THE CITY OF MIAMI BEACH, FLORIDA, ADOPTING THE
TENTATIVE CAPITAL IMPROVEMENT PLAN FOR FISCAL
YEARS (FY) 2022 - 2026 AND ADOPTING THE CITY OF MIAMI
BEACH TENTATIVE CAPITAL BUDGET FOR FISCAL YEAR
2022, SUBJECT TO A SECOND PUBLIC HEARING
SCHEDULED ON THURSDAY, SEPTEMBER 30, 2021 AT 5:03
P.M.
WHEREAS, the FY 2022 — 2026 Capital Improvement Plan (CIP), as amended at the
September 17, 2021 City Commission meeting, for the City of Miami Beach is a five-year plan
for public improvements and capital expenditures by the City and is an official statement of
public policy regarding long-range physical development in the City of Miami Beach; and
WHEREAS, the first year of the FY 2022 — 2026_ . CIP, as amended, represents the
tentative Capital Budget appropriation for FY 2022; and
WHEREAS, the tentative CIP, as amended, has been updated to include projects that will
be active during FY 2022 through 2026; and
WHEREAS, the tentative Capital Budget, as amended, itemizes project funds to be
committed during the upcoming fiscal year and details expenditures for project components
which include architectural and engineering, construction, equipment, Art in Public Places, and
other related project costs; and
WHEREAS, capital funding priorities for FY 2022 were discussed at the June 18th, July
16th, and July 23rd meetings of the Finance and Economic Resiliency Committee ("the
Committee") and the September 17, 2021 meeting of the City Commission and adjustments
were made to the funding recommendations presented per direction from the Committee and
Commission; and
WHEREAS, the tentative Capital Budget for FY 2022, as amended, totals $70,188,737
and is recommended by the Administration for adoption at this time for projects and capital
equipment acquisitions; and
WHEREAS, based on current schedules, additional water, sewer, and storm water
projects are financed over a series of years; and
WHEREAS, under this approach, the City utilizes a line of credit to allow the necessary
rate capacity to issue additional tax-exempt bonds through rate increases and also spend down
the current committed, but unspent, bond proceeds; and
WHEREAS, the Gulf Breeze Bond (Loan) Fund (Fund 369) was funded by loan proceeds
from the City of Gulf Breeze and payment of the Allison Island special assessment. All loan
proceeds were expended, and the remaining balance is special assessment receipts. In order to
utilize the remaining funds within Fund 369, which are not currently designated for any specific
use, it is recommended that the Mayor and City Commission approve the use of all remaining
and future funds in Fund 369 for the repairs of and improvements to City -owned facilities; and;
WHEREAS, the proposed sources of funding for the tentative FY 2022 Capital Budget, as
amended, are included in Attachment "A" and the projects to be adopted in the tentative FY
2022 Capital Budget and the five-year CIP, as amended, are included in Attachment "B."
NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF
THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby adopt
the Tentative Capital Improvement Plan (CIP) for FY 2022 through 2026 and adopt the City- of
Miami Beach Tentative Capital Budget for FY 2022, as amended at the September 17, 2021
City Commission meeting, subject to a second public hearing scheduled at 5:03 p.m., Thursday,
September 30, 2021.
PASSED AND ADOPTED this 17th day of September 2021.
ATTEST:
SEP 2' 2 2021
Rafael E. Granado, City Clerk
:INCORP ORATED
r, Mayor
APPROVED AS TO
FORM & LANGUAGE
& FOR EXECUTION
CftAitomey n�Z Dace
ATTACHMENT'A
MIAMIBEACH
PROJECT 'PROJECT NAME '
0. TRANSPORTATION FUND 106
CITY OF MIAMI BEACH
FY 2022- 2026 CAPITAL IMPROVEMENT. PLAN BY FUNDING SUMMARY
Previous Years FY 2022 FY 2023 FY 2024 FY 2025
FY 2026
Future Total
-20018 ADAPTIVE TRAFFIC SIGNAL CONTROLS
1,800,000
1,800,000
20118 BAYSHORE NEIGH. TRAFFIC CALMING lA
378,075
- 378,075
20218 NAUTILUS TRAFFIC CALMING PHASE 1
355,500
355,500
20221 16TH STREET PROTECTED BIKE LANES
90,000
560,000
650,000
20318 VENETIAN ILLUMINATED CROSSWALKS "
180,000
180,000
20617 NEW BUS SHELTER DESIGNS
504,251
r 504;251
20620 LA GORCE / PINE TREE DR BIKE LANES
230,000
1,570,000
1,800,000
21522 ALTON ROAD SHARED USE PATH PHASE II
3,631,000
3,631,000
60222 NORTH BEACH GREENWAYS PHASE III
150,000 1,170,220
1,320;220-'
60327 10TH STREET NEIGHBORHOOD GREENWAY
190,000
224,000 1,080,000
1,494,000
62222 WEST AVENUE BICYCLE LANES PHASE II'
108,000
533,072
641,072
62322 ORCHARD PARK TRAFFIC CALMING
138,000
843,054
981,054
66122 INDIAN CREEK DRIVE PROTECTED BIKE
131,000
131,000
Fund Total:'
112 RESILIENCY
1617,826
887,000
2,310,126` 3,820,220
5,431,000
13,866,172
20587 1 ST STREET-ALTON RD TO WASHINGTON
19,224,594
-
19,224,594
20597 WEST AVENUE PHASE II
15,000,000
15,000,000
21220 INDIAN CREEK STREET DRAINAGE IMP.
4,998,546
4,998,548
.24120 TOWN CENTER
8,455,496
8,455,496
26270 BAYSHORE PARK (PAR 31
3,500,000
3,500,000
29020 CITYWIDE SEAWALL REHAB
5,000,000
5,000,000
10,000,000
29310 CONVENTION CNTR LINCOLN RD CONNECTOR
1,800,000
1,800,000
Fund Total:
23,498,548,
26,024,594'
•. 13,155,496
62,978,638
23220 NORTH 5F
1,017,391
1,017,391,
1,017,391
69790 SUNSET 3 & 4 UTILITY PAYMENT 1,532,002 1,532,002
Fund Total:• 1,532,002 - 1,532,002
125 CAPITAL RENEWAL & REPLACEMENT
20000 PAVEMENT & SIDEWALK PROGRAM 37,986 463,000 7OQ986
20001 ALTON ROAD FOUNTAIN AT. 20TH STREET 20,150 20,150
i V l [AMI EACHFY
PROJECT 'PROJECT NAME'
CITY'OF MIAMI BEACH
2022- 2026 CAPITAL IMPROVEMENT. PLAN BY FUNDING SUMMARY .
Previous Years FY 2022 FY 2023 FY 2024 FY 2025
ATTACHMENT A
FY 2026 Future Total
20237
FAIRWAY PARK IMPROVEMENTS
1,923
1;923
21818
PROPERTY MGMT FACILITY GENERATOR
100,000
100,000
21821
MBPD HEADQUARTERS RENOVATION
99,600
99,600
27800
STREET LIGHTING IMPROVEMENTS
300,000
300;000
28550
LIFEGUARD STAND REPLACEMENTS
141,189
141,189
60007
POLICE STATION NEW GENERATOR
555,000
555,000
60030
POLICE STATION MEN'S LOCKER ROOM
241,371
241,371
60031
WATER TOWER RESTORATION STAR ISLAND
820,000
820,000
60038
SOUTH SHORE C.C. FIRE ALARM RENEWAL
11;370
11,370
60057'
FIRE STATION 3 EMERGENCY GENERATOR
"25,200
25;200
60418
HISTORIC CITY HALL HUMIDITY CONTROL
96,068
96,068
60420
FIRE STATION 2 -A/C REPLACEMENT
52,500
52,500
60519
CITY HALL 40 -YR STRUCTURAL
154,800
154,600'
60520
MBPDCONDENSER AND PUMPS
125,000
125,000
60618
HISTORIC CITY HALL FIRE ALARM
151,618
151,618
60718
NORTH SHORE PARK YOUTH. CENTER A/C
80,000
80,000
60719
UNIDAD ELEVATOR MODERNIZATION
70,000
70,000
60821
CITY HALL -REPLACE RESTROOM EXHAUST
35,000
- 35,000
61021
_ MB POLICE GARAGE CONCRETE SPALLING .
833,000
833,000
61100
. P.A.L. BUILDING - FIRE ALARM
74,500
74,500
61120
CITY HALL -COOLING TOWER BASE
100,000 ...
100,000
61121
SCOTT RAKOW YOUTH CENTER -KITCHEN
150,000
150,000
61221
NORM. ISLE POOL LOCKER ROOM & PUMPS
250,000
250,000
61290
CITY HALL FIRE ALARM SYSTEM
293,325
293,325
61320
UNIDAD BUILDING -DOOR RENEWAL
63,000
63,000
61321
.71 ST STREET WELCOME SIGN RENOVATION
40,000
40,000
61420
UNIDAD BUILDING -WINDOW SEAL RENEWAL
40,000
40,000
61521
CITY HALL LOADING DOCK RESURFACING
70,000 . -
70,000
• 61921
10TH ST. AUDIT. ENTRANCE DRAINAGE
250,000
250,000
62117
FIRE STATION #2 TRAINING TOWER
160,800
160,800
62421 -
COLONY THEATER LED LIGHTS UPGRADE
40,000
40,000
62622
HISTORIC CITY HALL FRONT ELEVATION
69,000
69,000
62822
INTERNAL AFFAIRS RESTROOM RENO
139,000
139,000
/\AJAM[REACH
CITY OF MIAMI BEACH
FY 2022'- 2026 CAPITAL IMPROVEMENT PLAN BY. FUNDING SUMMARY
ATTACHMENT A
PROJECT
PROJECT NAME
Previous Years FY 2022 FY 2023 FY 2024 FY 2025 FY 2026
Future Total
62920
FIRE STATION #2 WATERPROOFING
192,000 ' ..
192,000
62922
BASS MUSEUM EXTERIOR WALL REPAIRS
39,000
39,000
62923
FLAMINGO PARK HURRICANE WINDOWS
98,000
98,000
63022'
MIAMI CITY BALLET EXIT SIGN RENEWAL
73,000
73,000 "
' 63023
HISTORIC CH 2ND FLOOR RESTROOMS
74,000 "
74,000
63080
BEACH RESTROOMS PAINT AND CONCRETE'
225,000
225,000
63123
MBPD GARAGE LED LIGHT UPGRADE
110,000
110,000
63222
' COLONY THEATER EXIT SIGN RENEWAL
36,000
36,000
63223
BOYS & GIRLS CLUB SECURITY ENCLOSURE
27,000
27,000
63323
MBPD NESS DOCK RENOVATION
77,000
:. 77,000
63350
POLICE HO ELEVATORS & OTHER PROJECT
384,260
384,260
63420
NS YOUTH CNTR ROOFTOP A/C RENEWAL
120,000
- 120,000
63422
HISTORIC C. HALL ENERGY.EFF. WINDOW
52,000
52,000
63423
NORMANDY POOL LIGHTING IMPROVEMENT
41,000
41,000
63523
FIRE STATION 1 BATHROOMS RENOVATION
120,000
120,000
63623
FIRE STATION 1 ROLL -UP DOOR RENEWAL
51,000
51,000
63718
SANITATION INTERIOR REPLACEMENT
312,800
312,800
63721
FIRE STATION #1 ROOF REPAIRS
41,500
41,500
63723
FIRE ADMINISTRATION FLOORING RENEWAL
34,000
34,000
63821
MBPD 4TH FLOOR HVAC CONTROLS
312,000
312,000
63823
FIRE ADMIN BLDG UPS SYSTEM RENEWAL
39,000
39,000
63921
1701 MERIDIAN AVE 50 YEAR RECERTIFICATION
50,500
50,500
64020
CITY HALL CARD ACCESS SYSTEM REPL.
80,436
80,436
64021
HISTORIC CITY HALL 90 YEAR RECERTIFICATION
66,000 ..
66,000
64221
BASS MUSEUM WINDOW REPLACEMENT
67,355
67,355,
64222
1755 MERIDIAN FRESH AIR INTAKES.
63,000
63,000
64320
CITY HALL -COOLING CONDENSER
90,000
90,000
64322
1755 MERIDIAN ROOF REPLACEMENT
82,000
82,000
64420
CITY HALL RESTROOM RENOVATIONS
-
250,000
250,000
64422
MBPD GARAGE EXIT SIGNS AND SAFETY
. 31,000
31,000
64522'
MBPD MAIN ROOF REPAIRS
136,000
136,000
64622
SCOTT RAKOW YOUTH CENTER LIGHTING
1.15,000
115,000
65120
GREENSPACE FACILITY. SECURITY SYSTEM
.110,000
110,000
1AM-l•FY
!,�FACH-
PROJECT PROJECT NAME'
CITY OF MIAMI BEACH
2022- 2026 CAPITAL IMPROVEMENT PLANBY FUNDING SUMMARY
Previous Yeas FY 2022 FY 2023 FY 2024 FY 2025 FY 2026
ATTACHMENT A .:.
Future 'Total
65218PURDY AVE BOAT RAMP REPAIRS
84,661 '
Fund'Totol:,
GARAGE
84;661
65219 SOUTH POINTE PARK HVAC REPLACEMENT
85,000
7TH STREET. GARAGE -ELEVATOR
85,000
65319 CODE/ HOUSING OFFICES RELOCATION
588,475
7TH ST GARAGE -ENTRANCE FLOOD CONTROL
588,475
65320 UNIDAD INTERIOR &EXTERIOR PAINTING
22150
90,000
90;000-'
65420 MBPD NORTH SUB STATION PARKING LOT "
-26100
233,000
233,000
65520 MBPD N SUB STATION PAINTING, FLOORING -
27830
234,000
234,000
65720 ;HISTORIC CH -ROOF ACCESS (ADDER100,000
'60124
"-
100;000 "
65821 FIUMORE ESCALATOR REPAIRS
71,525
7SCARAGE-SUPERSTRUCTURE RENEWAL ....
71,525
65920 MBFD STATIONS SECURITY UPGRADES CW
126;000
126,000
66220 " : HISTORIC CITY HALL ELEVATOR
320,000' , _
320,000
67030 MARINE PATROL EXTERIOR RESTORATION
60,728
60,728
67040 NORMANDY ISLE PARK & POOL
200;000
200,000
67200 FIRE STATION 3 FIRE ALARM UPGRADE
'55,000 . - .
" : -
55,000
67220 FIRE STATION 3 EMERGENCY GENERATOR
43,955
43,955
'67240 777 BUILDING HVAC 4TH FLOOR
162,121 -
162,121
68720 ' ; POLICE HQ & PARKING GAR. FIRE ALARM . • .
246,033
"-
246,033
68760 CITY HALL ELECTRICAL UPGRADES
341,500
341,500
69220 PUBLIC WORKS FACILITY GENERATOR '.
195,863
195,863
Fund Total:'
126 SOUTH POINTE RENEWAL & REPLACE
7,044,112
780,000;- 5,168,0001 " ; -
12,992,1121,
65219 SOUTH POINTE PARK HVAC REPLACEMENT
25,000
25,000
Fund Total:
25,000
-
25,000;
20418
COLLINS PARK PERFORMING ARTS VENUE
800,000 - ..'
800,000
142 7TH STREET
Fund'Totol:,
GARAGE
800,000 .. t
800,00m:
20026
7TH STREET. GARAGE -ELEVATOR
400,000
.-.. 400,000
21121
7TH ST GARAGE -ENTRANCE FLOOD CONTROL
278,000.
278,000
22150
.72 ST. COMMUNITY COMPLEX
128,296
128,296
-26100
GARAGE SECURITY CAMERA SYSTEM ...
53,585
53,585
27830
PARKING GARAGE -AT 1262-COLUNS AVE
2,563,569
2,563,569-'
'60124
.7TH STREET GARAGE -LANDSCAPING..
- 120,000 ..
120,000
60224
7SCARAGE-SUPERSTRUCTURE RENEWAL ....
250,000.
250,000
(A H
MI BEAC
PROJECT PROJECT NAME
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT, PLAN BY FUNDING SUMMARY"
Previous Yews FY 2022 FY 2023 FY 2024 FY 2025
ATTACH ENT' M A
.
FY 2026 Future Total
60422 . 7TH ST GARAGE -FIRE SPRINKLER & PUMP
22618
300,000
"-
300,000 '
60620 7TH STREET GARAGE -INTERIOR DRAINAGE
30,000
194,000
194,000
30,000
60623 7TH STREET GARAGESTAIRWELL RAILING
-
116,000
25,000
25,000
60723'" 7TH ST GARAGE -TRAFFIC COATING
- - 7,936,131;
20518
150,000
150,000
61118 " 7TH STREET GARAGE UPGRADE LIGHTING
127,993
72 ST. COMMUNITY COMPLEX
.300,000
127,993
61218 7TH STREET PARKING GARAGE ROOF TOP
140,251
7,145,125
7,145,125
140,251
62621 " : 7TH STREET GARAGE-OFFICE/RESTROOM
.3,192,026 ....
36,000
NORMANDY SHORES GOLF CLUB TEE RENO
36,000
64719 7TH STREET GARAGE -DOOR REPLACEMENT
50,000
50,000
65121 7 STREET GARAGE UPS BATTERY SYSTEM
66,600
66,600
67520' 7TH STREET GARAGE -ROOFING REPAIRS
"45,756'
45,756
68220 7TH ST GARAGE SURFACE RESTORATION
95,000
95,000
69310 7TH ST. GARAGE FIRE ALARM SYSTEM
51,087
51,087
Fund Total:
3,352,137
614,000'.
175,000, 120,000, 650,0001
-s , 4,911,137
20377
"AIPP MB CONVENTION
7,530,797
7,530,/9/
22618
AIPP FIRE STATION 2
95,334
95,334
22718
AIPP FLAMINGO PARK PROJECT
194,000
194,000
22918
AIPP LUMMUS PARK PROJECT
116,000
116,000
155 FEES IN
Fund Total:'
LIEU OF PARKING
7,936,131'
- - 7,936,131;
20518
SURFACE LOT AT BISCAYNE BEACH
907,029
907,029
22150
72 ST. COMMUNITY COMPLEX
.300,000
300,000
27830
PARKING GARAGE AT 1262 COLLINS AVE
7,145,125
7,145,125
28080
-INTELLIGENT TRANSPORT SYSTEM
.3,192,026 ....
3,192,028
158 CONCURRENCY
Fund Total:
MITIGATION FUND
11,544,182
-
11,544,182.
20200
TRANSPORTATION CAPITAL INITIATIVE
8,192,028
8,192,028
20247
CITYWIDE PARKS IRRIGATION SYSTEM
156,000-
156,000.
25750
. WEST AVE BRIDGE OVER COLLINS CANAL
908,068
908,068
27910
MERIDIAN AVE SHARED USE PATH
756,000
756,000
28080'
INTELLIGENT TRANSPORT SYSTEM
10,322,972
10,322,972
'60321
CITYWIDE PARKS COURT REPAIRS ..
105,000
105,000
•60325
NORMANDY SHORES GOLF CLUB TEE RENO
125,000
125,000
IAMIFY
BEACH
PROJECT PROJECT NAME'
CITY'OF MIAMI BEACH
2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
Previous Years FY 2022 FY 2023 FY 2024 FY 2025
ATTACHMENT A
FY 2026 Future Total
60421 '
CITYWIDE FITNESS COURSE REPLACEMENT
100,000.
100,000
62022
FLAMINGO PARK TENNIS CENTER COURTS
30,000
30,000
62122
NORMANDY SHORES GOLF CARPET REPLACEMENT
40,000
40,000
62222
WEST AVENUE BICYCLE LANES PHASE II
23,000.
23,000
62322
ORCHARD PARK TRAFFIC CALMING
76,000
'630,813
706,813
62521
NORTH BEACH GREENWAYS -PHASE II
604,230
110,000
714,230
62718
N. BEACH PARKS, RESTROOM RESTORATION
91,000
91,000
64621
CITYWIDE PK LANDSCAPING IMPROVEMENT
152,000
152,000
65221
PINE TREE DRIVE AND 46TH STREET
603;603
603,603
65321"
PRAIRIE AVENUE AND 44TH STREET/CHAS . -
520,000
520;000
66222
71ST STREET BRIDGE BIKE LANES
100,000
100,000
69820
NORTH BEACH GREENWAYS PHASE 1
448,625
448,625
''160 RESORT
Fund Total:
TAX FUND 2%
21,079,526, .
2,384,000
630,813 -
24,094,339•
20200
TRANSPORTATION CAPITAL INITIATIVE
10,000,000
10,000,000
164 RDA CITY
Fund Total:
CENTER RENEWAL & REPLACEM ENT
10,000,000
-
10,000,000
29300
LINCOLN RD LENOX-COLLINS W/SIDE STR
20,000,000
- 20,000,000
64819
COLONY THEATER - FIRE ALARM SYSTEM
78,000
78,000
66120
'. LINCOLN RD STONE RESTORATION
214,619
214,619
165 NON
Fund Total:'
- TIF D• FUND
20,292,619
- -
- 20,292,619
20197
CITY CENTER, RESILIENCY ENHANCEMENTS
1,000,000
1,000,000
20200
TRANSPORTATION CAPITAL INITIATIVE
8,000,000
8,000,000
66120
LINCOLN RD STONE RESTORATION
153,381
153,381.
169 MIAMI
Fund Total:
CITY BALLET FUND
9,153,381
-
9,153,381
27780
MIAMI CITY BALLET WINDOWS
315,000
315,000
64618
MIAMI CITY BALLET VARIOUS REPAIRS
278,250
278,250
171101CAL
Fund Total:
OPTION GAS TAX
593,250
-
-
593,250
20000
PAVEMENT 8 SIDEWALK PROGRAM
1,695,000
1,695,000
21014
BICYCLE LANES/SHARED USE PATH IMPROVEMENT
844,247 1,980,000
2,824,247
.... .... . . ...
'
MIAMIBEACK
PROJECT PROJECT NAME'
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT. PLAN BY FUNDING SUMMARY ,
Previous Years FY 2022 FY 2023 FY 2024 ' FY 2025"
....ATTACHMENT A .
FY2026 Future 'Total
23020'
: ALTON RD & 16TH STREET INTERSECTION " ..
540,000 ...
540;000"
64918
SMART LIGHTING MASTER PLAN
203,000
203,000
187 HALF
Fund Totak:
CENT TRANS. SURTAX COUNTY
2,438,000+ i
- 844,247 _ 1,980,000:
- 5,262,241;
20220
SEAWALL -DICKENS AV SHORELINE '-
200,000
200,000
20597
WEST AVENUE PHASE II
530,000
-'
530,000
20718
SIGNALIZATION ALTON RD AND 4TH ST •,
580,000'
580,000
20818
ROYAL PALM- NEIGHBORHOOD'GREENWAY
430,000
430,000
'21014
'BICYCLE LANES/SHARED USE PATH IMPROVEMENT
130;000
- 130,000
21319
ROYAL PALM AVE & 46TH STREET CIRCLE
107,000-
(107,000
21419
MERIDIAN AVENUE PEDESTRIAN CROSSING
410,000
410,000
22518
ENHANCED CROSSWALKS -
480,000
- 480,000
23360
WEST AVE/BAY RD NEIGH, .
378,000'
378,000"
25650
CITYWIDE CURB RAMP INSTALLATION
80,560
80,560
25750
WEST AVE BRIDGE OVER COLLINS CANAL
1,966,380
_ . -
1,966,380
26700
ROW IMPROVEMENT PROJECT
1,844,084
1,844,084
27860
51ST STREET NEIGHBORHOOD GREENWAY
50,000
50,000
'27910
MERIDIAN AVE SHARED USE PATH
278,000
278,000
27930
SHARED. PATH ON PARKVIEW ISLAND PARK
320,000
320,000
27940
EUCLID AVE.: FROM 17TH ST &'5TH ST
470,000
470,000
28050
EVERGLADES COURT ALLEYWAY PAVING
300,000 ..
300,000
28080'
INTELLIGENT TRANSPORT, SYSTEM'
2,769,260'
2,761,260
29500
COLLINS CANAL ENHANCEMENT PROJECT
1,030,698
1,030,698 _
29810
ALLEYWAY RESTORATION PH III
412,500 ..
412,500
62322
ORCHARD PARK TRAFFIC CALMING
31,505
31,505.
62517
. MERIDIAN AVENUE. BICYCLE LANES ..
250,000
250,000
62617
72ND STREET PROTECTED BIKE -LANE . . .
519,000 ..
519,000
62717
73RD STREET PROTECTED BIKE LANES
239,000
239,000.
65321
". PRAIRIE AVENUE AND 44TH STREET/CHAS
84,420
84,420
65518
JEFFERSON AVE &.15TH ST BEACONS
74,200
74,200
--. -- -
CAP.
-. - Fund Total:
PROJ. NOT FINANCED BY BON
13,925,102
(75,495) -
13,849,607.
�301
.-20001
ALTON ROAD FOUNTAIN AT 20TH STREET
24,550
24,550
ATTACHMENT A .
CITY OF MIAMI BEACH
MIAMBEACKFY 20217 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
PROJECT
PROJECT NAME
Previous Years
FY 2022
FY 2023
FY 2024 FY 2025 FY 2026 Future Total
20110
28TH STREET OBELISK STABILIZATION
357,230
357;230
20200
TRANSPORTATION CAPITAL INITIATIVE
3,300,000
3,300,000
"20220
SEAWALL -DICKENS AV SHORELINE
231,974
231,974
20597
WEST AVENUE PHASE II .
8,861
8;861
22050
BAYSHORE NEIGH. BID PACK A
223,199
223,199
22150
72 ST. COMMUNITY COMPLEX
1,000,000
- 1,000,000
23200
FLAMINGO PARK
896,690
896;690
23518
BATTING CAGES AT NORTH SHORE PARK
203,000
203,000
24530
'SUNSET ISLANDS 1 &2 GUARDHOUSE
468;225
468,225
24630
FLAGLER MONUMENT SOLAR ILLUMINATION,
89,000
89,000
26270
BAYSHORE PARK (PAR 3(
412,100
412,100
26990
SECOND FL. RENOVATION -BUILDING DEPT
629,898
629,898
27950
NORTH BEACH OCEANSIDE PARK
9,710,000
283,000
9,993,000
62718
N. BEACH PARKS RESTROOM RESTORATION
190,000
190,000
63318
NORMANDY ISLE PARK POOL RENOVATIONS
47,000
47,000
64718
MUNIS / ENERGOV/ ERP PR
683,165'
683,165
302 PAY-AS-YOU-GO
Fund Total:
17,474,892
283,000
1,000,000-
- - - 18,757,892
20078
CITYWIDE STREET PAVEMENT
15,000;000 15,000,000
20187
LUMMUS PARK MUSCLE BEACH UPGRADE
68,000
68,000
20220
SEAWALL -DICKENS AV SHORELINE
3,420
3,420
20237
FAIRWAY PARK IMPROVEMENTS
1,426,914
877,000
877,000 3,180,914.
20247
CITYWIDE PARKS IRRIGATION SYSTEM
14,275
14,275
20250
LAGORCE ISLAND -LIGHTING TREES MISC.
66,376
66,376
20300
NORMANDY ISLE PARK TURF INSTALLATION
398,000
465,500
465,500 1,329,000
20418
. COLLINS PARK PERFORMING ARTS VENUE
400,000
422,000
822,000
20423
FLAMINGO PK FOOTBALL FENCE
613,000
613,000
20425
FLAMINGO PARK SOCCER FIELD TURF
281,000 281,000
20523
STILLWATER PARK LIGHTING & SOCCER
481,000 481,000
20577
BELLE ISLE PARK PLAYGROUND
294,585
294,585
-_- _ ---- 20597
WEST AVENUE PHASE II
1,469,640
1,469,640
20607
. 11TH STREET -FLAMINGO NEIGHBORHOOD
1,059,729
1,059,729
20623
MIAMI BEACH GOLF COURSE RENOVATION
6,000,000 6,000,000
AM BEAC ; �I
ATTACHMENT A
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
PROJECT
PROJECT NAME
Previous Years
FY 2022
FY 2023
FY 2024 FY 2025
FY 2026 Future Total
20721
GREENSPACE FACILITY RENOVATION
200,000
443,000
643,000
20722
FLAMINGO PK PLAYGROUND REPLACEMENT
830,000
830,000
20723
CRESPI PARK LIGHTING & MICRO SOCCER
481,000'
481,000
20821
BISCAYNE ELEM SHARED,FIELD LIGHTING
1,270,170
1,270;170
20822
FLAMINGO PK FOOTBALL STADIUM TURF
1,163,000
1,163,000
20918
BRITTANY BAY PARK
1,414,729
1,41'4,729
20921
NORMANDY ISLE PARK PLAYGROUND
489,000
489,000 '
21018
BAYWALK PHASE 2
386,000
386,000
21021
NSPYC KITCHEN & CABINETRY ADDITION
344,000
344,000
21022
WEST LOTS 85-86 ST CONVERSION
- 2,436,100
2,436,100 "
21118
STILLWATER ENTRANCE SIGN
225,000
225,000
21621
ADAPTIVE FITNESS AND RECREATION CTR
2,500,000
2,500,000
21721
REAL TIM CRIME CENTER BUILDOUT
. , . 1,500,000
-
- -
- -. 1,500:000
21821
MBPD HEADQUARTERS RENOVATION
32,437
-
-
- -
- - 32,437
22050
BAYSHORE NEIGH. BID PACK A
960,405
960,405
22150
72 ST. COMMUNITY COMPLEX
100,000
100,000
22420
POLO PARK LIGHTING & SOCCER FIELD
857,680
857,680
22750
ALTOS DEL MAR PARK
44,820
44,820
22920
CITYWIDE BRIDGES
925,202
750,000
750,000
800,000;
3,225,202
23118
. FIRE STATION 4 SECURITY ENHANCEMENT
50,683
- -
50,683
23180
BAYSHORE NEIGH. BID PACK D
745,500
745,500
23200
FLAMINGO PARK
554,489
554,489
23240
LA GORCE NEIGHBORHOOD IMPROVEMENTS
219,000
219,000
23318
SOUNDSCAPE AUDIO IMPROVEMENTS
751,410
751,410
23380
PALM & HIBISCUS ISLAND ENHANCEMENT
-50,000
50,000.
24530
. SUNSET ISLANDS .1 &2 GUARDHOUSE
200,000
200,000
24630
FLAGLER MONUMENT SOLAR ILLUMINATION
200,000
200,000
25750
WEST AVE BRIDGE OVER COLLINS CANAL
1,303,396
1,303,396.
27170
SEAWALL-BISCAYNE BAY ST END PH. LI
185,714
- 185,714
27800
STREET LIGHTING IMPROVEMENTS
50,000,000 50,000,000
27950
NORTH BEACH OCEANSIDE PARK
500,000
(283,000)
- 217,000
27990
MAURICE GIBB PARK FLOATING DOCK
177,000
177,000
28300
SHANE WATERSPORT.SEAWALL
134,000
134,000
..ATTACHMENT A
CITY OF MIAMI BEACH
/\AIAMIREACH FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY'.
PROJECT PROJECT NAME' Previous Yea Os FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 Future Totcd
28600
;NSPYC EXTERIOR. CAFE AND RESTROOMS
400,000 312,000
,
..-•
712;000
28850
-MAURICE GIBB PARK REDESIGN
28,658
28,658
28940
' BAYSHORE NEIGH: CENTRAL -SOUTH
21,824
-
21,824
29550"
CMB SKATEPARK; " :
"40,000
40,000 '
29620
ALLISON PARK REDESIGN
100,000
100,000
29810
ALLEYWAY RESTORATION PH 111
100,000
100,000
60011
IRRIGATION SYSTEM MACARTHUR CAUSEWAY
28,000
28,000
60020
FLEET MGMT-GENERATOR TRANSFER SWITCH
100,000
100,000
60026
'BELLE ISLE PARK PLAYGROUND REPLACEMENT
638,000
638,000
60226
PARK VIEW ISLAND PARK, PLAYGROUND REPLACEMENT
497,000
497;000
60122
SOUNDSCAPE PK LED LIGHTING
75,000
75,000
60123
CRESPI PARK PLAYGROUND REPLACEMENT
407,000'
407,000
60126
MUSS PARK PLAYGROUND REPLACEMENT
638,000.
638;000
60223
POLO PARK PLAYGROUND REPLACEMENT
-
476,000'
476,000
60321
CITYWIDE PARKS COURT REPAIRS
105,000
105,000
105,000'
105,000
105,000
525,000
60322
PARKS.MAINT. FACILITY RENOVATIONS
335,000
-
-.
-
335,000
60323
. STILLWATER PLAYGROUND REPLACEMENT
570,000
570,000
60421
CITYWIDE FITNESS COURSE REPLACEMENT
100,000
100,000
100,000'
100,000.'
100,000
500,000
60523
FLAMINGO FOOTBALL STADIUM RAILINGS
100,000.
100,000
60920
. HISTORIC CITY HALL-VFD REPLACEMENT
200,000
200,000
60924
NSPYC SAFETY IMPROVEMENTS -FRONT DESK. -
372,000
372,000
61020
CITY HALL -GENERATOR REPLACEMENT
600,000
600,000
61619
NORTH BEACH ROW LANDSCAPING
113,000
113,000
61621
CITY HALL CHAMBER 8 PRESS ROOM RENO
-
900,000.
900,000
61920
MAURICE GIBE SOIL REMEDIATION
896,000
- -
896,000
62019
. MIDDLE BEACH ROW LANDSCAPE
8,285
36,000 250,000
100,000
394,285
62619
ENERGY SUB -METERS IN MUN. BUILDINGS
68,000
68,000
62719
FLEET MGMT FACILITY REMEDIATION
111,000
-
111,000
62723
SCOTT RAKOW ICE RINK PERIMETER BOAR
354,000
354,000
62819
LAKE PANCOAST MANGROVE LIVING SHORELINE
30,000
1,450,000
1,480,000
---. --62823`
SCOTT RAKOW ICE -RINK REFRIGERATION-
1,128,000
1,128,000
62919
OUTDOOR TRAINING FACILITY (FIRE)
200,000
200,000
63019
BUILDOUT 1701 4TH FL FOR HOUSING
133,000
133,000
63722
SMART CARD ACCESS SYSTEM -PHASE II
ATTACHMENT A
195,000
63819
SSCC ROOT MITIGATION & FLOORING REP
272
CITY OF MIAMI BEACH
1\A I
AM IB E -AC- H
FY 2022 - 2026 CAPITAL IMPROVEMENT. PLAN BY FUNDING SUMMARY
1755 ROOF REPLACEMENT
PROJECT
PROJECT NAME
Previous Years
FY 2022 FY 2023 FY 2024 FY 2025
FY 2026 Future Total
63080
BEACH RESTROOMS PAINT AND CONCRETE
20,000
20,000
63319
PARK VIEW ISLAND ANNEX - DOG PARK
67,000
CITY HALL ENERGY EFFICIENT BUILDING
67,000
63519
BUOY PARK REFORESTATION IMPROVEMENT
150,000
150,000
63521
: RESTORATIVE TREE WELL CITYWIDE ,
480,000 240,000
720,000
63719
1755 MERIDIAN -CHILLER REPLACEMENT
211,045
836,500
211,045
63722
SMART CARD ACCESS SYSTEM -PHASE II
195,000
195,000
63819
SSCC ROOT MITIGATION & FLOORING REP
272
272
63822
1755 ROOF REPLACEMENT
223,000
223,000
'63919
SMART CARD ACCESS SYSTEM- PHASE 1'
250,000 • "
250,000
64019"'
CITY HALL ENERGY EFFICIENT BUILDING
156,000
156,000
64022
' 777 FOUNTAIN/ COURTYARD RENOVATIONS
131,000
131,000
"64119
INDIAN CREEK LANDSCAPE &IRRIGATION
836,500
836,500
64122"
" BOLLARDS INSTALLATION AND REPL.
200,000,
302,500
502,500
64190
ENTRANCE SIGNS TO NORTH BEACH
356,000
91,000
447,000
64418
THE FILLMORE 40 -YR RECERTIFICATION
622,298
622,298
64621
CITYWIDE PK LANDSCAPING IMPROVEMENT
-
248,000
200,000 200,000
200,000 200,000. 1,048,000
64721
MIDDLE BEACH WATER TOWER PAINTING
50,000
-
50,000
64821
SECURITY ENHANCEMENTS CITYWIDE
500,000
1,000,000
500,000 500,000
2,500,000
64918
. SMART LIGHTING MASTER PLAN
1,000,000
1,000,000
64921
OCEAN RESCUE FIRE ALARM RENEWAL
30,300
30,300
65021
BELLE ISLE PARK LIGHTING ENHANCEMENT
110,000
110,000
65519
BRIDGE REPAIRS FY19
60,875
60,875
65622
SHANE ROWING CENTER ROOF REPLACEMENT
61,000
61,000
65722
FLAMINGO PARK BASEBALL STADIUM.STAN
65,000
495,000
560,000
65818
FLEET MANAGEMENT FIRE SPRINKLER
.250,000
250,000
65821
FILLMORE ESCALATOR REPAIRS
16,000
16,000
65822
MIAMLBEACH MOORING FIELD
156,000
310,000
466,006
65922
TOBIAS REHBERGER OBSTINATE LIGHTHOUSE
85,000
85,000
66018
FLEET MANAGEMENT CONCRETE SPALLING
100,000
100,000
66020
CITY HALL -MAIN ENTRANCE PAVERS
-
550,000
550,000
66021
SOUTH POINTE PARK RESTROOMS RENOVATION
66,000
-
-
66,000
66418
FLAMINGO POOL DECK &PUMP ROOM
334,000
334,000
66518
SECURITY AUDIO SYSTEM FOR ALL POOLS
.100,000
100,000
PROJECT
PROJECT NAME Previous Yeois
FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 Future Total
67920
SMART BUILDING, AUTOMATION SYSTEM
100,000. " : 100,000
68120
'- NORMANDY SHORES GOLF CLUB PUMPS
196,000 196,000
69520
" WATERWAY RESTORATION 250;000
250,000
21270
Fund Total: 25,639,461.
3,649,000 12,859,000: 8,757,6701 4,710,100 11524,000, 72,540,000: .129,679,231
23380
PALM & HIBISCUS ISLAND ENHANCEMENT
480;209
480,209
0. CAPITAL
Fund Total:
RESERVE
480,209
480,209
20918
BRITTANY BAY PARK
295;000 -
295,000
21270
,VENETIAN NEIGH. -ISLANDS,
(320)'
" : (320)
22750
ALTOS DEL MAR PARK
384,823
384,823
23180
- BAYSHORE NEIGH: BID PACK D
639;000
639,000
23200'
: FLAMINGO PARK
295,000
295,000
23300
FLAMINGO NEIGHBORHOOD -SOUTH
2,185,327
2,185,327
23360
WEST AVE/BAY RD NEIGH.
30,000
30,000
23380
PALM & HIBISCUS ISLAND ENHANCEMENT
3,288,290
3,288,290
25750
WEST AVE BRIDGE OVER COLLINS CANAL
2,224,213
2,224,213
28610
' RUE VENDOME PUBLIC PLAZA
717,705
717,705
28940
BAYSHORE NEIGH. CENTRAL- SOUTH
61,8,790
618,790
29600
MUSS PARK FACILITY
245,000
245,000
65218
PURDY AVE BOAT RAMP REPAIRS
180,033
180,033
-
305 513 QUALITY
Fund Total:
OF LIFE REST.TAX 1%
11,102,861 - -
11,102,861
20001
ALTON ROAD FOUNTAIN AT 20TH STREET
279,000
279,000
20011
WORLD WAR.MEMORIAL
62,000
62,000
20177
OCEAN DR. EXTENDED SIDEWALK PROJECT
164,650
154,650
20187
LUMMUS PARK MUSCLE BEACH UPGRADE
232,000
232,000
20223
LUMMUS PARK PLAYGROUND REPLACEMENT
750,000.
750,000
20597
WEST AVENUE PHASE II
67,781
67,781
21119
BAYWALK 10TH TO 12TH STREET
310,000
310,000
-21218
STH STREET FLYOVER LIGHTING
.148,779
148,779
21821
MBPD HEADQUARTERS RENOVATION
49,900
49,900
22118
ENTERTAINMENT DISTRICT CAMERAS
170,000 ..
170,000
MIAMIBEACH
PROJECT 'PROJECT NAME
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT. PLAN BY FUNDING SUMMARY
Previous Years FY 2022 FY 2023 FY 2024 FY 2025
ATTACHMENT A
FY 2026 Future Total
23200
FLAMINGO PARK
2,460,322- .. "
63,000
63,000
2,460;322
25750
WEST AVE BRIDGE OVER COLLINS CANAL
334,000
64123
COLONY THEATER IMPACT GLASS
334,000
27360
RESTORATIVE TREEWELL--PH 4-SOUTH BCH
690,000
67,355
690,000
27800 '
STREET. LIGHTING IMPROVEMENTS
-201,988
64321
BASS MUSEUM CONDENSER WATER PUMPS 45,450
201,988
27990
MAURICE GIBB PARK FLOATING DOCK
373,000
373,000
28550
LIFEGUARD STAND REPLACEMENTS
1,798,800
1,798,800
28560'
COLLINS PK LIGHTING SOUND SYSTEM
236,000
236,000
29760
RESTORATIVE TREEWELL-PH 3
683,911
683,911
-60022
FLAMINGO PARK NORTH-SOUTH WALKWAY
300,000
300,000
60177
SOUTH BEACH PEDESTRIAN ZONES,
300,000
300,000
60420
FIRE STATION 2-A/C REPLACEMENT
18,700
18,700
60720
BEACHWALK TREE WELLS 14-22 STREET
150,000
150,000
61419
BEACHFRONT RESTROOMS-RENOVATIONS
25,000
25,000
62021
COLONY THEATER ELEVATOR
87,000
87,000
62022
FLAMINGO PARK TENNIS CENTER COURTS
130,000
130,000
62117
FIRE STATION #2 TRAINING TOWER
160,800
160,800
62119
BASS MUSEUM - ROOF REPLACEMENT
392,464
392,464
62121
BOTANICAL GARDENS RESTROOMS
50,500
50,500
62217
10TH ST AUDITORIUM COATING OF ROOF
65,650
65,650
62221
COLONY THEATER RESTROOM RENOVATION
73,000 -
73,000
62321
COLONY THEATER EXTERIOR PAINTING
68,000
68,000
62419
BASS MUSEUM - FREIGHT ELEVATOR
88,647
88,647
-62519
BEACHWALK DRAINAGES. POINTE- 23 ST
220,000
220,000
62523
ARTISTIC BOLLARDS
-
250,000
250,000
63080
BEACH RESTROOMS PAINT AND CONCRETE
-15,275
15,275.
63122
10TH ST AUDITORIUM LED UPGRADE
104,000
104,000
63720
10TH ST AUDITORIUM-LOUVER.
52,000
52,000
63923
BASS MUSEUM KEYSTONE SEAL.
63,000
63,000
64023
MIAMI CITY BALLET VARIABLE AIR VALVE
34,000
34,000
64123
COLONY THEATER IMPACT GLASS
103,000
103,000
------- 64221
BASS MUSEUM WINDOW REPLACEMENT 67,355
67,355
64223
BASS MUSEUM INTERIOR GALLERY WALL
63,000
63,000
64321
BASS MUSEUM CONDENSER WATER PUMPS 45,450
45,450
I - l IAMI.BEACH
PROJECT PROJECT NAME'
CITY OF MIAMI BEACH
FY 20227 2026 CAPITAL IMPROVEMENT. PLAN BY FUNDING SUMMARY
Previous Yews FY 2022 FY 2023 FY 2024 FY 2025-
ATTACHMENT A .
.
FY 2026•Futuro Total
64323
MIAMI CITY BALLET ACCESS CONTROL ..
250,000
20123
50,000
50,000-
64421
MBPD CUBAN MONUMENT RESTORATION
26,545
26,545
64423
MIAMI CITY BALLET UV LIGHT RETROFIT
33;000
33,000
64521
10TH ST AUDITORIUM HEAT PUMP RENEWAL, " :
191,900' ..
191;900-
91;90064523
64523
MIAMI CITY BALLET BOARD ROOM CARPET
88,000'
88,000
64621
CITYWIDE PK LANDSCAPING IMPROVEMENT
200;000
200,000
64623-
:BASS MUSEUM GALLERY FLOOR RENOVATION
226,000
226,000
64723
l OTH STREET AUDITORIUM SECURITY ENHANCEMENT
34,000
34,000
64823
BASS MUSEUM TRANQUILITY FOUNTAIN
46;000
- 46,000
64918
SMART LIGHTING MASTER PIAN " '
664,012' , .
400,OOD 200,000' 200,000
1,464:012
' 65220
MIAMI CITY BALLET STUDIO FLOORING
140,000
39,000
179,000
65222
MDPL MUSEUM MASTERPLAN
175,000
175,000
65422
WATERWAY MARKERS &_SIGNS
" :
263,000
263,000 '
65522
BASS MUSEUM 40 YEAR RECERTIFICATION
100,000
100,000
65721
' MXE LAND USE/MOBILITY/ECONOMIC DEVELOPMENT--
STUDY
190,000
(190,000)
65821
FILLMORE ESCALATOR REPAIRS
74,694
74,694
66021
SOUTH POINTE PARK RESTROOMS RENOVATION
20,000...
20,000
66022
SOUTH POINTE PARK SPLASH PAD
249,000.
249,000
66420
DADE BOULEVARD PEDESTRIAN PATHWAY
225,000
225,000
66520
SOUTH BEACH ROW LANDSCAPE
280,000
300,000 100,000
680,000
66720
COLONY THEATER -SOUND AND VIDEO
107,000
107,000
66920
S. P. PARK -FISHING PIER RAILING REP
198,000
198,000
67120
SOUNDSCAPE PARK IMPROVEMENTS
28,000,
28,000
67360
BASS MUSEUM EMERGENCY GENERATOR
133,900
133,900
68820
BEACH RESTROOMS EXHAUST SYSTEMS
19,000
19;000'
69620
'S. BOWL SIGNAGE/ PAINTING/ LIGHTING .
150,000..
.150,000
Fund Total:'
12,205,0231
854,000,
3,341,0001 • . 300,000: 200,000
16,900,0231
20108
MIAMI B. GOLF COURSE PRACTICE TEE 124,000..
124,000
20110
28TH STREET OBELISK'STABW7ATION 250;000
250,000
20123
INDIAN BCH PK PLAYGROUND EXPANSION 792,000
792,000
20321
BEACHVIEW PK PLAYGROUND REPLACEMENT -• , - - 505,000 ' ' - , ,
-, - 505,000
... H..
PROJECT PROJECT NAME
CITY OF MIAMI BEACH
FY 2022- 2026 CAPITAL IMPROVEMENT. PLAN BY FUNDING SUMMARY .
Previous Yeas FY 2022 FY 2023 FY 2024 FY 2025
ATTACHMENT A"
FY 2026 Future Total
20330"
" MIDDLE BEACH REC CORRIDOR PH II
1;425,000 ...
.. -
1,425;000...
20521
JULIA TUTTLE ENTRANCE SIGN
275,000
275,000
20820
MB GOLF COURSE STORAGE TANK "
97;909
97,909
21019"
; SHORT-TERM 41 ST ST RECOMMENDATIONS
100,000 "
100;000 "
21120
" MIAMI BEACH GOLF CLUBHOUSE ROOF
257,000
257,000
21420
MB GOLF COURSE IRRIGATION PUMP
100;000
- 100,000
21620'
SECURITY CAMERAS ON BEACHWALK 23-46
903,000
"
903;000 "
26270
-BAYSHORE PARK (PAR 3)
1,990,000
"400,000
2,390,000
27800
STREET LIGHTING IMPROVEMENTS
493,600
- " " 493,600
28070'
;MIDDLE BEACH REC. CORRIDOR PH III
2;675,000'
2,675;000 '
28550
- LIFEGUARD STAND REPLACEMENTS
540,000
540,000
28850
MAURICE GIBB PARK REDESIGN
1,973,482
1,973,482
29600
'MUSS PARK FACILITY
2;450,000
" :
" :
2,450,000
29810
ALLEYWAY RESTORATION PH Ill
60,000
60,000
60077
FIRE STATION 2 ALARM SYSTEM
10,000
10,000
60121
BEACHVIEW FITNESS COURSE REPLACEMENT,
" " 146,000
146,000
60824
MB'GOLF CLUBHOUSE CARPET REPLACEMENT
42,000
42,000
61419
BEACHFRONT RESTROOMS•RENOVATIONS ...
26,000
26,000
61719
41ST STREET BRIDGES REPAIR
480,000
480,000
61819
BEACHWALK DRAINAGE - 24 ST TO 46 ST
100,000
100,000
61822
MB. GOLF CLUB DRIVING RANGE NETTING
114,000
" .
114,000
61919
41 ST STREET FOUNTAIN RESTORATION
82,000
821000
61922
. MB GOLF CLUBHOUSE PAINTING
70,000
70,000
62019
MIDDLE BEACH ROW LANDSCAPE
82,000
100,000
50,000 50;000
- 282,000
62023
MB GOLF. CLUB KITCHEN FLOORAEPLACEMENT
43,000
43,000
62117
FIRE STATION #2 TRAINING TOWER
80,091
80,091
62423
SECURITY CAMERA BEACHWALK - MID BCH.
890,000 890,000
1,780,000
62523
ARTISTIC.BOLLARDS
250,000
250,000.
63622
MB GOLF CLUB REEL GRINDERS REPLACEMENT
71,000
71,000
64119
INDIAN.CREEK LANDSCAPE & IRRIGATION ..
363,500
363,500
64121
FIRE STATION.13 40 YEAR RECERT.
48,700
48,700
64918
SMART LIGHTING MASTER PLAN
200,000 '
400,000 200,000 200,000
1,000,000
65218
PURDY AVE BOAT RAMP REPAIRS
200,000 •
.
200,000
MIAM 1. BE ACH
PROJECT PROJECT NAME
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT. "PLAN BY FUNDING SUMMARY
Previous Years FY 2022 FY 2023 FY 2024 FY 2025
ATTACHMENT A .:.
.
FY 2026 Furore Totdl
65322'
MIAMI BEACH GOLF CLUB LAKE AERATION
-'
" : 45,000".
45;OOD"'
65422
WATERWAY MARKERS &"SIGNS
' 132,000
132,000
'66322
"NON-MOTORIZED VESSEL KAYAK LAUNCH
70,000 ""
400;000
470,000
68820"
BEACH RESTROOMS EXHAUST SYSTEMS
" 9,000'
9;000 "
307 NB QUAL
Fund Total:1
OF LIFE RESORT TAX I %
15,912,2821
975,000'
2,481,000; 11687,000 " 200,000'
21;255,282'
20023 "
: ALLISON PARK PLAYGROUND REPLACEMENT , •,
795,000
795;000
20421
', NORTH SHORE BANDSHELL REAR CANOPY'
310,000
310,000
20627
' NORTH SHORE BANDSHELL CANOPY ' •
668;000 ' •
668,000
20920
NORTH SHORE' BANDSHELL REAR SEATING "
188,000 "
168;000
22150
72 ST. COMMUNITY COMPLEX
346,000
346,000
22218
NORTH BEACH YARD
59;263
59,263
22750
ALTOS DEL MAR PARK"
1;350,000
- -
-
1,350,000
25380
BAND SHELL MASTER PLAN
1,133,372
1,133,372
'26500
KAYAK LAUNCH DOCKS
644,080
644,080
27800
STREET LIGHTING, IMPROVEMENTS
717
629,000
629,717
27950
. NORTH BEACH OCEANSIDE PARK . "
3,675,000
3,675,000
28550
LIFEGUARD STAND REPLACEMENTS
540,000 -
540,000
28600
NSPYC EXTERIOR CAFE AND. RESTROOMS' ...
1,001,000 ..
1,001,000
28610
. RUE VENDOME PUBLIC PLAZA
1,794,000
1,794,000
--28630
"BONITA DRIVE STREET END IMPROVEMENT ...
135,000 ..
135,000
29550
CMB"SKATEPARK
150,280 _ ,
150,280- .
29620
ALLISON PARK REDESIGN
1,432,000
1,432,000
29810
"ALLEYWAY RESTORATION PH III
60,000
60,000
60237
COLUNS J HARDING ALLEY.RESTORATION
.100,000
100,000
60921
N. SHORES GOLF.CLUB-CLUBHOUSE ROOF
184,000
184,000
"61219
N: SHORE TENNIS.FACILITY FENCE
47,000 ....
47,000
61319
N. SHORE BANDSHELL PLUMBING REPAIRS
30,000
p,000.m.
61419
. BEACHFRONT RESTROOMS-RENOVATIONS
87,000
87,000
61619
NORTH BEACH ROW LANDSCAPING. . . ..
157,000
.300,000 1004000
557,000
62523`=
ARTISTIC.BOLLARDS -
250,000.
250,000
62623
.SECURITYCAMERABEACHWALK- NORTHBCH
647,500 647,500..
1,295,000
63318
NORMANDY ISLE PARK POOL RENOVATIONS...
17,000
358,000..
375,000
101AMIBEACHFY
PROJECT PROJECT NAME
CITY OF MIAMI BEACH
2022 - 2026 CAPITAL IMPROVEMENT. PLAN -BY FUNDING SUMMARY
Previous Years FY 2022 FY 2023 FY 2024 ' FY 2025
ATTACHMENT. A
FY 2026 Future Total
63522 NORTH SHORE BANDSHELL SIGNAGE REPL.
" :
CONVENTION CENTER PARK
97,000 "-'
7,750,000
97,000
64160 PAINTING & LIGHTING OF BRIDGES
1,585,000
3,997,580
29310'
CONVENTION CNTR LINCOLN RD CONNECTOR
1,585,000
64190 ENTRANCE SIGNS TO NORTH BEACH
58,000
244,000
- 831,679
2,000,000
1,133,679
.64722 . SHANE ROWING CENTER HVAC UNITS REPLACEMENT
292,000,000 350,000:
61,000
20597
WEST AVENUE PHASE II
61,000
64822 SHANE ROWING CENTER DOCK RAMP
21220
INDIAN CREEK STREET DRAINAGE IMP.
227,000
352,755
227,000
'64918 SMART LIGHTING MASTER PLAN
396,883
989,081
400,000 200,000
200,000
1,196,883
64922 NORTH BEACH OCEANSIDE PARK CCTV SEG
23380
156,000
1,337,096
1,337,096.
:. 156,000
65921 -71 ST STREET BUSINESS CORRIDOR LIGHT
69,000
- 1,337,096'
20297
EXPANSION OF CITY WIDE SURVEILLANCE
69,000
67140 81ST ST PEDESTRIAN BRIDGE
180,000
WEST AVE BRIDGE OVER COLLINS CANAL
59,952
59,952
180,000
68820' BEACH RESTROOMS EXHAUST SYSTEMS
7,000
- 239,952
r 7,000
Fund Total:'
0: RESORT TAX REV. BONDS 2015
15,910,595' 1
1,129,000,
2,105,500' 2,408,179'
995,000'
- ,22,548,274
28160 CONVENTION CENTER RENOVATION
216,632,193
216,632,193
Fund Total:
216,632,193'
-
216,632,193'
. 28160
CONVENTION CENTER RENOVATION
268,602,420 - - -,
- - - z6a,6Uz,4ZU
28170
CONVENTION CENTER PARK
7,750,000
7,750,000
28180
CONVENTION CENTER - CARL FISHER.
3,647,580 350,000
3,997,580
29310'
CONVENTION CNTR LINCOLN RD CONNECTOR
10,000,000
10,000,000
29320
.17TH STREET NORTH IMPROVEMENTS .
2,000,000
2,000,000
320 GENERAL
Fund Total:
CAPITAL -MDC ILA
292,000,000 350,000:
- 292,350,000
20597
WEST AVENUE PHASE II
7,390,575 -
7,390,575
21220
INDIAN CREEK STREET DRAINAGE IMP.
352,755
352,755
23000
SUNSET HARBOUR PUMPSTATION UPGRADES
989,081
989,081
350 PALM
Fund Total:'
ISLAND UNDERGROUND UTILITIES
8,732,411
- 8,732,411,
23380
PALM & HIBISCUS ISLAND ENHANCEMENT
1,337,096
1,337,096.
351 REALLOC.
Fund Total:
FUNDS -OTHER CAP. PROJ
1,337,096• -
- 1,337,096'
20297
EXPANSION OF CITY WIDE SURVEILLANCE
180,000
180,000..
25750
WEST AVE BRIDGE OVER COLLINS CANAL
59,952
59,952
Fund Total:
239,952
- 239,952
ATTACHMENT A
CITY OF MIAMI BEACH
IAMIH FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY BEAC
PROJECT PROJECT NAME' Previous Years FY 2022 'FY 2023 FY 2024 FY 2025FY 2026 Future Total
23270
CITY CENTER' COMMERCIAL DISTRICT BPB
13,539,610
13,539,610
23300
FLAMINGO NEIGHBORHOOD -SOUTH
18,932
18,932
23360
WEST AVE/BAY RD NEIGH.
750,000'
750,000"
25650
CITYWIDE CURB RAMP INSTALLATION
1,500
1,500
"25980
BASS MUSEUM GENERATOR
117,816
- 117,816
26010
BASS MUSEUM HYDRAULIC ELEVATOR
"66,127' " "
66,127
27070
BEACHWALK LIGHTING RETRO
665,625
665,625
'27600
SEAWALL -BOTANICAL GARDEN
1,208;662
1,208,662
27780"
MIAMI CITY BALLET WINDOWS
126,799" "
126,799
28010
COLONS PARK PARKING GARAGE
25,521,271
25,521,271
28160
CONVENTION CENTER RENOVATION '
6,914,221
6,914,221
28180
CONVENTION CENTER - CARL FISHER
265,320
265,320
29300
LINCOLN RD LENOX-COLLINS W/SIDE STR
20,000,000
20,000,000
29500
COLLINS CANAL ENHANCEMENT PROJECT
2,999,999
2,999,999
29530
COLONS PARK ANCILLARY IMPROVEMENTS
4,000,000 ..
4,000,000
29880
LINCOLN RD MALL ADA PEDESTRIAN
87,500
87,500
366 PARKS
Fund Total:.
AND REC. BEAUTIF. FUNDS
76,283,382 -;
76,283,382
20577
BELLE ISLE PARK PLAYGROUND
230,000
230,000
21270
VENETIAN NEIGH.. -ISLANDS
23,355
23,355
23000
SUNSET HARBOUR PUMPSTATION UPGRADES
440,800
440,800
28850
MAURICE GIBB PARK REDESIGN
626,542
626,542
61920
MAURICE GIBE SOIL REMEDIATION
196,000
196,000
67420
FLAMINGO PARK" POOL PLAYGROUND
65,383
65,383.
369 GULF
Fund Total:'-
BREEZE BOND FUND -OTHER
1,582,080 - -
- - - 1;582,080
64822
SHANE ROWING CENTER DOCK RAMP
413,000
413,000
RCP -
Fund Total:
1996 1 SM GO BOND
473,000 -
- 413,000
20577
BELLE ISLE PARK PLAYGROUND
5,566
5,566
22750
ALTOS DELMAR PARK
315,849
315,849
23200
FLAMINGO PARK
336,423
336,423
V IAMI . B EACH
PROJECT PROJECT" NAME
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT. PLAN BY FUNDING SUMMARY
Previous Years FY 2022 FY 2023 FY 2024 ' FY 2025
ATTACHMENT A .
... ..
FY 2026 Future Total
67420" : FLAMINGO PARK POOL PLAYGROUND
104,175'
p 104,175 "
Fund Total:'
373 99 GO :• •. IMPRO
762;013; -
_ '762,013
22050 BAYSHORE NEIGH. BID PACK A
(200( " .
(200( "
23180 BAYSHORE NEIGH. BID PACK D'
3,828
3,828
23220 " NORTH SHORE NEIGH. IMPROVEMENTS
427,541
- 427,541
23240' LA GORCE NEIGHBORHOOD IMPROVEMENTS.
64,203
64;203 '
23300 FLAMINGO NEIGHBORHOOD -SOUTH
164,785
164,785
23360 WEST AVE/BAY RD NEIGH.
197;991
197,991
Fund Total:
374 GULF BREEZE
858,148;-,
858,148, '
.23200 FLAMINGO PARK'.
137:080
137,080
Fund Total:'
BONDS376 99 GO
. " 137,080
137,080
21270 VENETIAN NEIGH. -ISLANDS
2,930,534
2,930,534
22050 BAYSHORE NEIGH. BID PACK A
417,634 , , .
417;634
23220 " NORTH SHORE NEIGH. IMPROVEMENTS
245,045
245,045
23240 LA'GORCE NEIGHBORHOOD IMPROVEMENTS -
61
61
23360 WEST AVE/BAY RD NEIGH,
13,527
13,527
23380 PALM 8 HIBISCUS ISLAND ENHANCEMENT
47,808
47,808
Fund Total:
377 99 GO BONDS - PARKS & BEACHES
3,654;609' -
3,654,609
22750 ALTOS DEL MAR PARK
109,643
109,643
23200 FLAMINGO PARK .
203,400 - - - -
203,400
- Fund Total:
SOUTH379 .,
" " 313,043; . . -•
313,043'.
. 20587 ' IST STREET-ALTON RD.TO WASHINGTON
4,669,616
4,669,616
23018 SOUTH POINTE PARK LIGHTING .
585,000
585,000.-
23300 FLAMINGO NEIGHBORHOOD SOUTH
261,194
261,194
27370 541N DIAMETER REDUNDANT SEWER.FORCE
990,000
990,000
_ - 60177- SOUTH BEACH" PEDESTRIAN ZONES
650,000
650,000
61117 RESTORATIVE TREE WELL TREATMENT
145,000
145,000
Fund Total:
7,300;810, - .. -
- 7,300,810
MIAMIBEACH
PROJECT PROJECT NAME
2003382
CITY OF MIAMI BEACH
FY 2022- 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
Previous Years FY 2022 FY 2023 FY 2024 FY 2025
ATTACHMENT A"
FY 2026 Future Total
60057
FIRE STATION 3 EMERGENCY GENERATOR '
100,000
100,000
60077
FIRE STATION 2 ALARM SYSTEM
89,000
89,000
67220
FIRE STATION 3 EMERGENCY GENERATOR -
66,045-
66,045
2003
Fund Total:
255,045 - -
255,045
20237
FAIRWAY PARK IMPROVEMENTS
116
116
20577
BELLE ISLE PARK PLAYGROUND
46,349
46,349
22750
ALTOS DEL MAR PARK
2,790;357
2,790,357
23200
FLAMINGO PARK
4,646,453
4,648,453
67420
FLAMINGO PARK POOL PLAYGROUND
76,026
76,026
3,878,208
Fund Total:
7,561;301 - -
7,561,301
20327
2 WAY CONVERSION 42ND ST. SHERIDAN
510,000 - - --
- - 510,000
-20597
WEST AVENUE PHASE II
3,010,683
3,010,683
20607
11TH STREET -FLAMINGO NEIGHBORHOOD
1,511,349
1,511,349
21270
VENETIAN NEIGH -ISLANDS
3,669,649
3,669,649
22050
BAYSHORE NEIGH. BID PACK A
3,106,901
3,106,901
23180
BAYSHORE NEIGH. BID PACK D
300,344
300,344
23220
NORTH SHORE NEIGH. IMPROVEMENTS
668,191
668,191
23240
LA GORCE NEIGHBORHOOD IMPROVEMENTS
372,930
372,930
23300
FLAMINGO NEIGHBORHOOD -SOUTH
56,353
56,353.
23360
WEST AVE/BAY RD NEIGH.
3,878,208
3,878,208
23380
PALM & HIBISCUS' ISLAND ENHANCEMENT
567,822
567,822
25750
WEST AVE BRIDGE OVER COLLINS- CANAL
65,738
65,738
28940
BAYSHORE NEIGH. CENTRAL -SOUTH
4,170,522
4,170,522
29500
COLLINS CANAL ENHANCEMENT PROJECT
1,428,192
1,428,192
60257
BAY DRIVE NEIGHBORHOOD GREENWAY
100,000
100,000.
.1388 SOUTH
Fund Total:
POINTE POST D, CDT
23,416,882
23A16,882
20330
MIDDLE BEACH REC CORRIDOR PH II
6,888,442
6,888,442
20587
. 1ST STREET-ALTON RD TO WASHINGTON
70,931
70,931
20597
WEST AVENUE PHASE 11
501,093
501,093
MIAMIH
PROJECT PROJECT NAME'
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
Previous Years FY 2022 FY 2023 FY 2024 FY 2025
ATTACHMENT A .
FY 2026 Furore Total
23200" FLAMINGO PARK
5;562,273"
FLAMINGO PARK
5,562,273
26270 BAYSHORE PARK SPAR 31
4,558,090
BAND SHELL MASTER PLAN
4,558,090
-'27950 NORTH BEACH OCEANSIDE -PARK
1,907;075
Fund Total:
- - 1,907,075
66718BEACH STORAGE AREA ENCLOSURE
170,000'
GO BONDS - PARKS
GO#1: 72 ST. COMMUNITY COMPLEX
170;000
Fund Total:
389 SOUTH POINTE CAPITAL
19,586,973,
70,931'
19,657,904
20587 1 ST STREET-ALTON RD TO WASHINGTON
4,741,799'
704,475
5,446,274-
20607 1 1TH STREET -FLAMINGO NEIGHBORHOOD
552,777
-
552,777
21220 INDIAN CREEK STREET DRAINAGE IMP.
2,500;366
-' 2,500,368
23000 SUNSET, HARBOUR PUMPSTATION UPGRADES
551,300
551,300
23270 CITY CENTER COMMERCIAL DISTRICT BPB
3,381,241
3,381,241
23360 WEST AVE/BAY RD NEIGH:
4,900;000
4,900,000
23618 LENOX COURT & JEFFERSON AVE SEAWALL
300,000
300,000
25650 CITYWIDE CURB RAMP INSTALLATION
10,500
10,500
26340 PENRODS AT 1 OCEAN DR. PARKING LOT
2,798,310
2,798,310
27370 541N DIAMETER REDUNDANT SEWER FORCE
6,600,000
6,600,000
28550 LIFEGUARD STAND REPLACEMENTS
300,000
300,000
28740 SEAWALL -HOLOCAUST MEMORIAL
100,000
100,000
28780 SEAWALL DADE BLVD - WASHINGTON AVE
1,625,000
1,625,000
28790 CONVENTION CENTER DR TO WASHINGTON
1,800,000
1,800,000
28820 INDIAN BEACH PARK SEAWALL
715,000
715,000
29560 BRITTANY BAY PARK SEAWALL
1,109,000
1,109,000.
61117 RESTORATIVE TREE WELL TREATMENT
147,000
147,000
65219 SOUTH POINTE PARK HVAC REPLACEMENT
50,000
50,000
66618 SOUTH POINTE PK -FIRE ALARM RENEWAL
35,000
35,000
Fund Total:
32,217,295
704,475
- 32;921,770
390 MIAMI-DADE
COUNTY BOND „
23200
FLAMINGO PARK
3,099,000
3,099,000,
25380
BAND SHELL MASTER PLAN
1,500,000
1,500,000
'391
Fund Total:
4,599,000 -
-' - 4,599,000
-- - ------2019
25019
GO BONDS - PARKS
GO#1: 72 ST. COMMUNITY COMPLEX
10,800,000
10,600,000
25119
GO#2: COLLINS PARK
557,287
557,287
V iA 1. B E ACH
PROJECT PROJECT NAME
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT.PLAN'BY FUNDING SUMMARY
Previous Years FY 2022 FY 2023 FY 2024 ' FY 2025
ATTACHMENT
.
FY 2026 Future •' Totdl
25219"
: GO#3: CRESPI PARK
184,921
-.. - _: -
- 184:921
" 25319
GO#4: FAIRWAY PARK
260,000
260,000
25419
GO#5: FLAMINGO PARK &YOUTH CENTER
15,400,000
- 15,400,000
25719
GO#8: LUMMUS PARK
4;737,000 . .
4,737f000 .
25819
GO#9: MARJORY STONEMAN DOUGLAS PARK
682,000
682,000
'25919
GO#l0: MAURICE GIBB PARK
4,500,000
4,500,000
26119
: GO#12:.NOBE OCEANSIDE PARK BEACHWALK
2;000,000
2,000,000
26219
GO#13: N.SHORE PARK & YOUTH CENTER
3,540,000
3,540,000
26319
GO#15; PAR 3 / BAYSHORE PARK
15,700,000
15,700,000
26419'
GO#17:.POLO PARK
493,675
493,675 '
26519
GO#18: SCOTT RAKOW YOUTH CENTER
4,053,045
4,053,045
26619
GO#19:SOUNDSCAPE PARK
4,500,000
4,500,000
26719'
GO#23: BAYWALK PEDESTRIAN BRIDGE
10,000,000
10,000,000
26819
GO#24: MIDDLE BEACH BEACHWALK PH3
4,500,000
4,500,000
27119
GO#29: WEST LOTS
1,000,000
1,000,000
27219"
GO#30: SKATE PARK
750,000
_ 750,000
28919
GO#26: ROOFS FOR CULTURAL FACILITIES
2,932,631
2,932,631
67819
GO#21: STILLWATER PARK...
142,441
_
142,441
392 2019
Fund Total:
GO BONDS
86,733,000
86,733,000'
22819
GO#57: CAMERAS- ENTERTAINMENT DIST. ...
1,490,000
- 1,490,000
23119-
GO#49: PUBLIC SAFETY RADIO SYSTEM
9,700,000'
9,700,000. "
28319
GO#45: FIRE STATION #1
4,000,000
4,000,000
28419
GO#46: OCEAN RESCUE. NOBE FACILITY ....
9,000,000
- 1,000,000
28519
GO#47: LICENSE PLATE READERS
1,950,000
- ' -
- 1,950,000
28719
".GO#53: SECURITY FOR PUBLIC SPACES
2,000,000
2,000,000
28819
GO#54:.MARINE PATROL FACILITY
. 2,000,000 ..
:. 2,000,000
68519
GO#48: POLICE HO FACILITY
5,500,000
5,500,000.:
68819
GO#50: CAMERAS- BUSINESS DIST..
825,000
825,000
68919
GO#52:.LED LIGHTING IN PARKS
3,741,000 . - .
3,741,000
69019
GO#55: STREET LIGHTING IMPROVEMENTS
3,500,000
3,500,000.
'69119
GO#56: CAMERAS, BEACHWALK
700,000
700,000
Fund Totaf:;
36,406000' i.,
j
36,406 000'
W,.AM I B EACH
PROJECT PROJECT NAME
NEIGHBORHOODS393 2019 GO BONDS-
CITY OF MIAMI BEACH
FY 2022 Y. - 2026 CAPITAL IMPROVEMENT. PLAN FUNDING SUMMARY
Previous Years FY 2022 FY 2023 FY 2024 FY 2025
ATTACHMENT A
.
FY 2026 Future Total
24619 GO#37: SIDEWALK IMPROVEMENTS
5,200,000
5,20 ,
27319 GO#31: OCEAN DRIVE CORRIDOR
2,000,000
- - 2,000,000
27419 GO#32: PAIM"& HIBISCUS. IANDSCAPING
1,000,000
1,000;000 -
27719 GO#36: WASHINGTON AVE. CORRIDOR
1,000,000
1,000,000
27819 GO#38: STREET PAVEMENT
5,800;000 -
- 5,800,000
27919" : GO#39: SEAWALLS & SH.ORELINES:
5;000,000
5,000;000' ,
28019 GO#40: 41 ST. CORRIDOR
1,500,000
1,500,000
68219 GO#33: STREET TREE MASTER PLAN
2,500,000
2,500,000
68419 GO#42;TRAFFIC CALMING
1;500,000
1,500,000'
68619 " GO#43: BIKE LANES & SHARED USE PATH
2,500,000
2,500,000
Fund Total:,
410 BUILDING CAPITAL FUND
28,000;000128,000,000
_I
26990 SECOND FL. RENOVATION -BUILDING DEPT 1,240,000 1,240,000
Fund Totali 1,240;000. ( ' 1,240,0001
20527
FDOT UTILITIES RELOCATION
221,175
285,000
-
506,175
20607
1 ITH STREET -FLAMINGO NEIGHBORHOOD . -
40,468
-
- -
40,468
20619"
WASTE WATER'STATIONS REHABILITATION
" .
2,870,733
2,339,267 "-,
5,210,000 "
23000
SUNSET HARBOUR PUMPSTATION UPGRADES
1,013,016
1,013,016
23360
WEST AVE/BAY RD NEIGH.
376,706
376,706
27370-
541N DIAMETER REDUNDANT SEWER FORCE
2,370,395
2,370,395
28120
WATER PUMP STATIONS IMPROVEMENTS
1,000,000
2,595,937
2;115,063
5,711,000
28220
WASTEWATER MANHOLE REHABILITATION .
. 3,045,000 ..
1;592,000
4,637,000
28320
SEWER PUMP STATION ODOR CONTROL
850,600
850,600.
28420
SWR PUMP STATION # 18 IMPROVEMENTS
1,400,000
1,400,000
28520
WATER &.WASTEWATER MAINS AND REHAB
140,889 ..
7;833,710
6,38.1,290
14,355,889
60319-
WATER METER REPLACEMENT PROGRAM
9,104,893
7
9,104,893 -
60419
DERM & EPA CONSENT DECREE
1,400,000
500,000
2,800,000 2,800,000. 2,800,000 2,800,000
13,100,000
.64923
PW WHS & SHOPS LED LIGHTS RETROFIT
74,000
74,000
—__- 65421
VALVE REPLACEMENT PROGRAM'
1,029,000
1,029,000.
66818
. WATER STATION ROOF REPLACEMENT
30,000 '
-
- - - -
- 30,000
Fund Total:,
20,993,142
16,706,379.
13,709,621' 2,800,000` 2,800,000; 2,800,000,
59,809,142'
ff
I'tEAC H AA
PROJECT PROJECT NAME
BONDS419 2017 WATER & SEWER
CITY OF MIAMI BEACH
FY 2022- 2026 CAPITAL IMPROVEMENT PLAN BY. FUNDING SUMMARY
Previous Years FY 2022 FY 2023 FY 2024 ' FY 2025
ATTACHMENT. A .
FY 2026 Future Total
20527 FDOT UTILITIES RELOCATION
677,529
677,529
20597 WEST AVENUE PHASE II
18,333,671
18,333,671
20607' , 11TH STREET -FLAMINGO NEIGHBORHOOD . _ .
2,495,457
2,495;457
20619 WASTE WATER STATIONS REHABILITATION
11,103,400
11,103,400
20719 SCADA AND PLC SYSTEMS
3,137,750
3,137,750
21270 VENETIAN NEIGH. -ISLANDS.
597,022
597,022
23000 SUNSET HARBOUR PUMPSTATION UPGRADES
539,631
539,631
23220 NORTH SHORE NEIGH. IMPROVEMENTS
138,427
138,427
23240 : LA GORCE NEIGHBORHOOD IMPROVEMENTS.
297,347
r. 297;347
23360 WEST AVE/BAY RD NEIGH.
110,000
110,000
23380 PADA & HIBISCUS ISLAND ENHANCEMENT
3,963,099
3,963,099
27370":541NDIAMETER 'REDUNDANT SEWER FORCE ..
3;997,327' ";
:. 3,9971327
28120 WATER PUMP STATIONS IMPROVEMENTS
4,595,000
4,595,000
28520 WATER & WASTEWATER MAINS AND REHAB
26,276,820
26,276,820
28940 BAYSHORE NEIGH. CENTRAL -SOUTH
3,616,516
3,616,516
60319 WATER METER REPLACEMENT PROGRAM
7,000,000
7,000,000
'65421 VALVE REPLACEMENT PROGRAM
931,635 830,853 -
1,762,488
Fund Total:,
420 W&S GBL SERIES 2010 2009-27243
87,810,631 830,853; .
88,641,484
.20527 FDOT UTILITIES RELOCATION.
178,825
- 178,825
21270 VENETIAN NEIGH. -ISLANDS
2,766,100
2,766,100
22050 BAYSHORE NEIGH. BID PACK A
3,895,513
3,895,513
23000 SUNSET HARBOUR.PUMPSTATION UPGRADES ..
.2,500,062 ..
2,500,062
23180' BAYSHORE NEIGH. BID PACK D
2,850,793
2,850,793
23220 NORTH SHORE NEIGH. IMPROVEMENTS
2,368,323
2,368,323
23360 WESTAVE/BAY RD. NEIGH...
1,632,360
1,632,360
23380 PALM & HIBISCUS ISLAND ENHANCEMENT
2,547,712
2,547,712.
27370 54IN DIAMETER REDUNDANT SEWER FORCE
.566
566
Fund Tcitalv
18,740,254t
18,740,254
ATTACHMENT A
CITY OF MIAMI BEACH
LAE I FY 2022 - 2026 CAPITAL IMPROVEMENT. PLAN BY FUNDING SUMMARY KACH
PROJECT
422 WATER
'PROJECT NAME
AND SEWER IMPACT FEES
Previous Years FY 2022 FY 2023 FY 2024 '" FY 2025 FY 2026
Future Total
20527
FDOT UTILITIES RELOCATION
1;215,000
1,215,000
23180
BAYSHORE NEIGH. BID PACK D
97,000
97,000
GULF
Fund Total:
BREEZE
2006423
97,000. 1,215,000:
- 1,312,000
21270
VENETIAN NEIGH. -ISLANDS
1,134,463
1,134,463
22050
BAYSHORE NEIGH. BID PACK A "
765,052
765,052
23240
LA GORCE NEIGHBORHOOD IMPROVEMENTS
56,000
56,000
23380
PALM & HIBISCUS ISLAND ENHANCEMENT
2,828,927
2,828,927
28940"
' BAYSHORE NEIGH. CENTRAL; SOUTH
106,792 . ,
106,792
28940
Fund Total:
4,891,234'
4,891,234
21270
VENETIAN NEIGH. -ISLANDS
3,659,741
3,659,741
22050
BAYSHORE NEIGH. BID PACK A
2,893,609 - - -
- - - 2,893,609
23180
'BAYSHORE NEIGH. BID PACK D
777,897
777,897
23220
NORTH SHORE NEIGH. IMPROVEMENTS
2,024,350
2,024,350
23240
LA GORCE NEIGHBORHOOD IMPROVEMENTS
524,662
524,662
23300
FLAMINGO NEIGHBORHOOD -SOUTH
-1,211,126
- 1,211,126
23360
WEST AVE/BAY RD NEIGH.
1,063,111
1,063,111
23380
PALM & HIBISCUS ISLAND ENHANCEMENT
1,222,509
1,222,509
27370
541N DIAMETER REDUNDANT SEWER FORCE
78,434
78,434
28940
BAYSHORE NEIGH. CENTRAL -SOUTH
1,715
1,715
425 WATER
Fund Total:
AND SEWER ENTERPRISE FUN
13,457,154 -
- 13,457,154
21270
VENETIAN NEIGH. -ISLANDS
1,529,777
1,529,777
22050
BAYSHORE NEIGH. BID PACK A
50,770
50,770
23180
BAYSHORE NEIGH. BID PACK D
358,785
358,785
23360
WEST AVE/BAY RD NEIGH..
106,783
106,783.
23380
PALM & HIBISCUS ISLAND ENHANCEMENT'
503,278
503,278
28940
BAYSHORE NEIGH. CENTRAL- SOUTH ' .
309,433
309,433
64220
PUBLIC WORKS FACILITY EXTERIOR
84,914
84,914
69220
.PUBLIC WORKS FACILITY GENERATOR
130,209
130,209
Fund Total:
3,073,949 -
- - - 3,073,949
M1AMIBEACH
PROJECT PROJECT NAME'
427 STORMWATER ENTERPRISE FUND
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT" PLAN BY FUNDING SUMMARY'
Previous Years FY 2022 FY 2023 FY 2024 FY 2025
ATTACHMENT A
FY 2026 Future • Total
21270 VENETIAN NEIGH. -ISLANDS
2,600,270
2,600,270
'23000 SUNSET HARBOUR PUMPSTATION UPGRADES
1,974,840
- 1,974,840
23380 PALM & HIBISCUS ISLAND ENHANCEMENT ,
449,272
w 449;272
27170 SEAWALL-BISCAYNE BAY ST END PH. II
1,508,344
1,508,344
28940 BAYSHORE NEIGH: CENTRAL -SOUTH
75,486
- 75,486
69220 PUBLIC WORKS FACILITY GENERATOR
65,105
65,105
Fund Total:
428 STORMWATER BONDS 000
6,673,317
6,673,317
21270 VENETIAN NEIGH. -ISLANDS
4;353,561
4,353,561
22050 BAYSHORE NEIGH. BID PACK A
1,549,281
1,549,281
23180 BAYSHORE NEIGH. BID PACK D
119,601
119,601
23240 LA GORCE NEIGHBORHOOD IMPROVEMENTS
730,899 "
730,899
23270 CITY CENTER COMMERCIAL DISTRICT BPB
(28,330) - - - -
- - (28,330)
23300 FLAMINGO NEIGHBORHOOD -SOUTH
3,375,123
3,375,123
23360' WEST AVE/BAY RD NEIGH. -
1,260,981
1,260,981
23380 PALM & HIBISCUS ISLAND ENHANCEMENT
427,465
427,465
Fund Total:;
11,788,581,
11,788,581,
20587
1ST STREET-ALTON RD TO WASHINGTON
17,459,326
17,459,326
20597
WEST AVENUE PHASE II
57,041,515
57,041,515
20607
11TH STREET -FLAMINGO NEIGHBORHOOD
1,942,680
1,942,680
20719
SCADA AND PLC SYSTEMS
4,100,250
4,100,250
21220
INDIAN CREEK STREET DRAINAGE IMP.
5,267,542
5,267,542
23000
SUNSET HARBOUR PUMPSTATION UPGRADES
3,750,973
3,750,973
23180
. BAYSHORE NEIGH. BID PACK D
2,343,000
2,343,000
23270
CITY CENTER COMMERCIAL DISTRICT BPB
2,300,000
2,300,000
23360
WEST AVE/BAY RD NEIGH..
515,356
515,356
23380
. PAUA & HIBISCUS. ISLAND ENHANCEMENT
5,699,315
5,699,315
25750
WEST AVE BRIDGE OVER COLLINS CANAL
283,380 ..
283,380
28920
BIOSWALE PILOT PROJECT
850,000
850,000.
28940
BAYSHORE NEIGH. CENTRAL -SOUTH
1,065,000
1,065,000
Fund Total:
102,618,337 - -
102,618,337
MIAM:BEACH
CITY OF MIAMI BEACH
FY 2022- 2026 CAPITAL IMPROVEMENT PLAN -BY FUNDING SUMMARY
ATTACHMENT A .
PROJECT
431 2011
PROJECT NAME
STORMWATER :.
Previous Yews FY 2022 FY 2023 FY 2024 FY 2025 FY 2026
Futu►e Total
21270
VENETIAN NEIGH. -ISLANDS
2,592,490
2,592,490
'22050
BAYSHORE NEIGH. BID PACK A
10,632,774
10,632,774
23000
SUNSET.HARBOUR PUMPSTATION UPGRADES.
3,552,816'
3,552;816
23180
BAYSHORE NEIGH. BID PACK D
2,606,560
2,606,560
23240
' LA'GORCE NEIGHBORHOOD IMPROVEMENTS
2,039
2,039
23270
CITY CENTER COMMERCIAL DISTRICT BPB
132,000
132,000
23300
FLAMINGO NEIGHBORHOOD -SOUTH
205,800
205,800
23360
WEST AVE/BAY RD NEIGH:
5,854;876
5,854,876
23380
PALM & HIBISCUS ISLAND ENHANCEMENT
1,535,601
1,535,601
28940
BAYSHORE NEIGH. CENTRAL -SOUTH
104,420
104,420
432 STORMWATER
Fund Total:,
BONDS 2015
27,219,376
- 27,219,376
21270
VENETIAN NEIGH. -ISLANDS
20,516,285 - - - - -
- .20,516,285
22050
BAYSHORE NEIGH: BID PACK A
590,216
590,216
23000
SUNSET HARBOUR PUMPSTATION UPGRADES
12,962,851
12,962,851
23180
BAYSHORE NEIGH. BID PACK D
4,177,000
4,177,000
23270
CITY CENTER COMMERCIAL DISTRICT BPB
5,856,402
5,856,402
23360
WEST AVE/BAY RD NEIGH.. - .
4,433,928
4,433,928
23380
PALM & HIBISCUS ISLAND ENHANCEMENT
22,578,586
22,578,586
27370
541N DIAMETER REDUNDANT SEWER FORCE
3,607,765
3,607,765
28940
BAYSHORE NEIGH. CENTRAL -SOUTH
11,686,706
11,686,706.
Fund Total:
86,409,739 ! - -
86,409,739
20422
FLAMINGO NEIGHBORHOOD
300,000
300,000-
20597
WEST AVENUE PHASE 11
1,787,000
1,787,000
21220
INDIAN CREEK STREET DRAINAGE IMP.
8,957,255
8,957,255
23180
BAYSHORE NEIGH. BID PACK D
1,200,000
1,200,000
23220
NORTH SHORE NEIGH. IMPROVEMENTS
450,000
450,000
23380
PALM & HIBISCUS ISLAND ENHANCEMENT
. 2,690,176
2,690,176
24020
ORCHARD PARK
.250,000
250,000
28300
SHANE WATERSPORT SEAWALL
650,000
650,000
"
LAMI BEACH
" PROJECT PROJECT NAME'
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
Previous Years FY 2022 FY 2023 FY 2024 FY 2025
ATTACHMENT A
FY 2026 Future Total
29020 CITYWIDE SEAWALL REHAB.
10000,000m
10,000,000
Fund Total:
434 STORMWATER CAPITAL NOT BONDS
26,284,431
-' - 26,284,431
21220 INDIAN CREEK STREET DRAINAGE IMP.
232,458
232,458 "
21720 DRAINAGE SYSTEM WATER QUALITY PILOT
500,000
500,000
23270 CITY CENTER COMMERCIAL DISTRICT BPB
628,603
628,603
23360 WEST AVE/BAY RD NEIGH.
401,046
401,046
29820 STORM WATER OUTFALLS
2,000,000
2,000,000
Fund Total:'
- 3,762,107
- 3,762,107
21920
RECONFIGURATION OF SANITATION AREA
330,000
330,000
63718
SANITATION INTERIOR REPLACEMENT
190;000
190,000
64318
BAYSHORE GREEN WASTE FACILITY
750,000
750,000
69470
FLEET/SANITATION FIRE ALARM' SYSTEM
42,900
42,900
439 MIAMI-DADE
Fund Total: -
COUNTY :. .
1,312,900.
-- - 1,312,900
28160
CONVENTION CENTER RENOVATION
54,426,432 m54,426,432
440 CONVENTION
Fund Total:
CENTER OPERATIONS
54,426,432,
- 54,426,432.
21618
CONVENTION CENTER GARAGE EQUIPMENT
121,000
121,000
28160
CONVENTION CENTER RENOVATION
1,557,174
1,557,174
28170
CONVENTION CENTER PARK
1,712,000
1,712,000
441 CONVENTION
Fund Total:
DEVELOPMENT TAX$35M
3,390,174 -
- - 3,390,174'
28160
CONVENTION CENTER RENOVATION
19,921
19,921
442 CONVENTION
Fund Total:
DEVELOPMENT TAX$15M
19,921 -
19,921
28160
CONVENTION CENTER RENOVATION
2,457,531
2,457,531
443 CONV
Fund Total:
CTR RENEWAL AND REPLACEMENT
2,157,531 -
- 2,457,531
--- ---- - 65022
CONV.CTR. RUBBER WALLS, REPLACEMENT
184,000 -
184,000
65023
CONV.CTR. EXHIBIT HALLS FIRE STROBE
- 300,000
300,000
65122
CONV.CTR. ADDITIONAL SECURITY CAMERAS
250,000.
250,000
MIAMI BEA.CH
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
ATTACHMENT A
PROJECT
PROJECT NAME
Previous Years
FY 2022
FY 2023
FY 2024 FY 2025FY 2026
Future Total
65123
CONV.CTR. VIBRATION ISOLATORS
100,000
100;000
65223
CONVENTION CTR: EXHIBIT HALL LIGHTS
60,000
60,000
67322
PARKING DECK CRACKS REPAIR
280,000
280,000
67422'
: EAST CHILLED WATER PIPING INSULATION
35,000. •
35,000 "
67522
CANAL PARK LANDSCAPING REPLACEMENT
40,000
40,000
67622
TERRAZZO FLOOR SCRUBBERS
40,000
40,000
67722
" ENERGY CONSUMPTION, MANAGEMENT INTEGRATION
SYSTEM
" ' 35,000.
35;000
67822
CHILLER UNES.FLUSHING
25,000
25,000
RDA-
Fund Total:,
GARAGE FUND
889,000
460,000
1,349,000
�463
20022
16TH ST. GARAGE -JOINT REPLACEMENT
200,000
200,000
20200
TRANSPORTATION CAPITAL INITIATIVE
7,000,000
7,000,000
21124
16TH STGARAGE-EXTERIOR RENEWAL
400,000:
400,000
28010
COLLINS PARK PARKING. GARAGE
2,069,000
2,069,000.
60023
16TH ST GARAGE -PLUMBING SYSTEM UPDATE
75,000
75,000
601.90
ANCHOR GARAGE ELEVATOR.REPLACEMENT
357,995
357,995
60324
16TH STREET GARAGE -GENERATOR
-
250,000
250,000.
61718
16TH STREET GARAGE FIRE SPRINKLER
1,444,000,
1,444,000
61818
16TH STREET GARAGE STAIRWAYS
101,200
101,200
61918
16TH STREET GARAGE ROOF AND DECK
1,808,000
1,808,000
62422
16TH STREET GARAGE HVAC RENEWAL
34,000
34,000
62721
16TH STREET GARAGE OFFICE/RESTROOM
30,000
30,000
62821
16TH STREET GARAGE -ROOF TOP RENEWAL
34,000
34,000
65019
16TH STREET GARAGE (ANCHOR) - PAINT
100,000
100,000
65521
16TH STREET CANVAS AWNING RENEWAL
56,560
56,560
66918
ANCHOR GAR. -FIRE ALARM REPLACEMENT
221,000
221,000
67018
ANCHOR GARAGE -STAIRWELL DOORS
27,000
27,000
67118
ANCHOR - INTERIOR FLOOR DRAINAGE
30,000
30,000
67922
16TH STREET GARAGE -EXTERIOR PAINT RENEWAL &
WATERPROOFING.
-
550,000
550,000"
_ Fund Total:
13,214,755
848,000
75,000
650,000, -
14,787,755 .
ATTACHMENT A
CITY OF MIAMI BEACH
IAMI.BEACH FY 2022 - 2026 CAPITAL IMPROVEMENT. PLAN BY FUNDING SUMMARY
PROJECT PROJECT NAME Previous Years FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 Future Total
20200
TRANSPORTATION CAPITAL INITIATIVE
6,000,000
20,000
26100
GARAGE SECURITY CAMERA SYSTEM
6,000,000
467 PENN
-Fund Total:
GARAGE FUND
6,000,000
100,000
100,000
26340
- 6,000,000'
20025
PENN GARAGE -ELEVATOR RENEWAL
27480
218,000
220,000
500,000 "
718,000
26100
GARAGE SECURITY CAMERA SYSTEM
20,000
28080
INTELLIGENT TRANSPORT SYSTEM
2,500,000
20,000
60025
PENN GARAGE -ROOFTOP -STAIRS ELEVATOR
38,000
38,000
60130
40,000
40,000
60424
PENN GARAGElGENERATOR RENEWAL
13TH STREET PARKING GARAGE ELEVATOR
325,300
325,300
200,000
200,000
'60524
PENN GARAGE -PLUMBING SYSTEM UPDATE
62100
42ND ST. PARKING GARAGE MAINTENANCE
240,000
75,000 -
75,000
60823
PENN GARAGE -FIRE SPRINKLER RENEWAL
200,000
69370
" : 300,000
51,087
300;000
60923
PENN GARAGE -FIRE PUMP REPLACEMENT
100,000
100,000
61023
PENN GARAGE -FIRE ALARM SYSTEM
35;000
-
35,000
63021
PENN GARAGE -HVAC RENEWAL
85,000
35,000
120,000
63121
PENN GARAGETRAFFICCOATING-RETAIL
-
100,000
-
- - -
- 100,000
64319
PENN GARAGE -NEW LIGHTING DISPLAY
135,000
135,000
67218
PENN GARAGE-SEAUNG OF. SUPERSTRUCTURE
25,000'
25,000
67318
PENN GARAGE-INT.SURFACE RESTORATION
95,000
95,000
Fund Total:'
275,000
403,000
435,000.
275,000 " 575,000'
1,963,000
:0 PARKING
25650
OPERATIONS FUND
CITYWIDE CURB RAMP INSTALLATION
20,000
20,000
26100
GARAGE SECURITY CAMERA SYSTEM
250,000
- • 250,000
26290
17TH ST. PARKING GARAGE MAINTENANCE
100,000
100,000
26340
PENRODS AT 1 OCEAN DR. PARKING LOT
52,137
52,137
27480
SURFACE LOT P48 BASS MUSEUM LOT
220,000
220,000
27830
PARKING GARAGE AT 1262 COLLINS AVE
30,000
30,000
28080
INTELLIGENT TRANSPORT SYSTEM
2,500,000
2,500,000
28710
P14 6TH ST.& COLLINS PARKING LOT
38,000
38,000
60130
13TH ST GARAGE FIRE ALARM
46,580 "
46,580
61660
13TH STREET PARKING GARAGE ELEVATOR
325,300
325,300
61930
17TH STREET PARKING GARAGE ELEVATOR
876,000
876,000
62100
42ND ST. PARKING GARAGE MAINTENANCE
240,000
240,000
62940
CITYWIDE PARKING LOT LIGHTING
200,000
200,000
69370
42ND ST. GARAGE FIRE ALARM SYSTEM
51,087
51,087
I AM ���AIHCITY
PROJECT PROJECT NAME
OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT. PLAN BY FUNDING SUMMARY
Previous Years FY 2022 FY 2023 FY 2024 FY 2025
ATTACHMENT A
FY 2026 Future Total
69360 42ND ST GARAGE ELEVATOR REPLACEMENT
565,145
565,145
Fund Total:
5,514,249
-
_ 5;514,249
22020GARAGE-LICENSE PLATE RECOGNITION
463,205
463;205 •"
26100 GARAGE SECURITY CAMERA SYSTEM
1,000,000
1,000,000
26290 17TH ST. PARKING GARAGE MAINTENANCE -
135,000
135,000
28710' P14 6TH ST & COLLINS PARKING LOT
303,000
303,000 "
29580 LOT 9D P866976 INDIAN CREEK DRIVE
468,000
468,000
60119 17TH STREET PARKING GARAGE COATING
1,400,000
1,400,000
60120' 13TH STREET PARKING GARAGE COATING
800,000
800,000 '
61217 13TH ST. GARAGE-WINDOW/GLASS BLOCK
35,350
35,350
61623 SUNSET HARBOUR GARAGE -FIRE ALARM
35,000
-
- 35,000
61717' ' 42ND ST. GARAGESOYR CERTIFICATION
312,090
312,090
62418 12TH STREET GARAGE ROOF AND DECK
299,806
- - - -
- - 299,806
62518 1755 MERIDIAN GARAGE ROOF AND DECK
500,000
500,000
62522 13TH STREET GARAGE NEON RENEWAL
67,000
67,000
63321 13TH STREET GARAGE40YR CERT.
300,000
-
300,000
64018 17TH ST GARAGE 40YR RECERTIFICATION
484,833
484,833
65621 42ND STREET GARAGE FALL PROTECTION
151,500
7
151,500
Fund Total:..
BONDS488 PARKING REV 2015
6,687,784
67;000
- 6,754,784'
21618 CONVENTION CENTER GARAGE EQUIPMENT
185,260
185,260
28160 CONVENTION CENTER RENOVATION
64,811,756
.64,811,756
Fund Totalr
490 PARKING CAPITAL NOT BONDS
64,997,016
64,997,016
20125 1755 MERIDIAN GARAGE ELEVATOR
500,000 " 500,000
20225 SUNSET HARBOUR GARAGE.ELEVATOR
500,000
500,000
20325 SUNSET HARBOUR GARAGE -ROOFTOP
300,000
300,000
20823 1755 MERIDIAN GARAGE FIRE SPRINKLER
300,000
300,000
20923 SUNSET HARBOUR GARAGE SPRINKLER
300,000
300,000
21224 1755 GARAGE GENERATOR
200,000
200,000.
21324 SUNSET HARBOUR GARAGE GENERATOR
200,000
200,000
21618 CONVENTION CENTER GARAGE EQUIPMENT
464,740
464,740
ATTACHMENT A
CITY OF MIAMI BEACH
FY 2022- 2026 CAPITAL IMPROVEMENT PLAN- BY FUNDING SUMMARY
Previous Years FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 Future Total
21718 : BISCAYNE BEACH ADDITIONAL PARKING 250,000' . 250;000
22020 ' GARAGE -LICENSE PLATE RECOGNITION 391,795 391,795
22120
12TH ST GARAGE -ELEVATOR REPLACEMENT
174;450
174,450
22122 '
SUNSET. HARBOUR GARAGE SCREENING
- ...
200,000 .
22150
" 72 ST. COMMUNITY COMPLEX
10,471,704
10,471,704
'22220
17TH ST. GARAGE -ELECTRICAL FEEDER
225,000
225,000
26100
_ GARAGE SECURITY CAMERA SYSTEM
89,472
89,472
26340
" PENRODS AT 1 OCEAN DR. PARKING LOT
103,666
103,666
60125
1755 MERIDIAN GARAGE OFFICE ROOF
-
300,000
300,000
60225"
SUNSET HARBOUR GARAGE.INT. FLOOR
34,000
34,000
60317
CITYWIDE PARKING LOTS IMPROVEMENTS
150,000
150,000
150,000'
150,000
600,000
60522
12TH ST GARAGE- INT. FLOOR DRAINAGE
-25,000
25,000
60622
13TH ST. GARAGE -PARKING SIGN RENEWAL
30,000
30,000
60624
. 17TH STREET GARAGE -EXTERIOR COATING
300,000
300,000
60722
42 ST GARAGESTAIRWELL WATERPROOFING
50,000
50,000
60724
42ND STREET GARAGE -FIRE SPRINKLER
40,000
-40,000
60822
1755 MERIDIAN GARAGE LED LIGHTING
150,000
150,000
60922
SUNSET. HARBOUR GARAGE SEALING
75,000
75,000
61022
SUNSET HARBOUR GARAGE -TRAFFIC COATING
-
303,000
303,000
61123
12THST GARAGE -STAIRWELL DOOR
32,000
32,000
61223
.12TH ST. GARAGE -STAIRWELL RAILING
25,000
25,000
61317
13TH ST.. GARAGESTAIR W ELL RAILING
50,000
50,000
61323
.42ND ST GARAGE -PLUMBING SYSTEM UPDATE
-
75,000
75,000
61417
17TH ST GARAGE INT. FLOOR DRAINAGE
30,000
30,000
61423
1755 GARAGE FIRE PUMP REPLACEMENT
100,000
100,000
61517
17 ST GARAGE -STORAGE SPACE RENOVATION
.100,000
100,000
61523
SUNSET HARBOUR. GARAGE FIRE PUMP
100,000
100,000
61617
17TH ST GARAGE -PLUMBING SYSTEM UPDATE
75,000
75,000.
61817
.42ND ST. GARAGE -STAIRWELL RAILING
25,000
25,000
61917
1755 MERIDIAN GARAGE FLOOR DRAINAGE
200,000.
200,000
62017
SUNSET HARBOUR GARAGE LED LIGHTING
300,000
300,000
62100
.42ND ST. PARKING GARAGE MAINTENANCE
160,000
160,000
62118
12TH STREET PARKING LIGHTING (LED)
64,000
64,000
JAMAA I,BEACH--
PROJECT PROJECT NAME
CITY OF MIAMI BEACH
FY 2022- 2026 CAPITAL IMPROVEMENT -PLAN BY FUNDING SUMMARY
Previous Yeas FY 2022 FY 2023 FY 2024 FY 2025
ATTACHMENT A . .
.
FY 2026 ' Future Total
62218
13TH STREET GARAGE LIGHTING (LED) " :
86,000 ...
86;000
62223
12TH STREET OVERHEAD GATE RENEWAL
61,100'
61,100
'62940
CITYWIDE PARKING LOT LIGHTING
250;000
'
250,000
63221
12TH STREET GARAGE -DOMESTIC WATER ..
79,000.
000.:.
79,000
64018
17TH ST GARAGE 40YR RECERTIFICATION
270,594
270,594
64419
13TH STREET GARAGE - WATER SYSTEM
33;000
33,000
64519
17TH STREET GARAGE - IST FL OFFICE
45,000
45;000'"
64619
SURFACE LOTS CITYWIDE LANDSCAPING
100,000
100,000
66121
12 ST. PARKING GARAGE' FIRE' ALARM
50,000 •'
50,000
" 67418'
42ND STREET GARAGE -DISPATCH AREA
100,000
100,000
67518
1755 MERIDIAN AVE OFFICE SECURITY
35,000
35,000
67618
12TH STREET GARAGE -ROOF RENEWAL'
64,000
64,000
67818
17 ST GARAGE -GENERATOR. REPLACEMENT, ,
120,000'
120 000.:.
68018
42ND STREET GARAGE -GENERATOR
96,550
96,550
68022
SKIDATA GARAGE SOFTWARE UPGRADE
475,000
- 475,000
68118 '
42ND ST GARAGE- INTERIOR DRAINAGE ...
34,000' ,
34,000
5 10 FLEET
Fund Total:
MANAGEMENT FUND
13,453,971
2,164,000;
1,521,100` 890,000-1 1,284,000' 1
500,000; 19,813,0711
60326
FY26 VEHICLE/EQUIPMENT REPLACEMENT . _
5,1.07,000. 5,107,000
60417
. FY20 VEHICLE/EQUIPMENT REPLACEMENT
7,468,000
7,468,000
'60425
FY25 VEHICLE/EQUIPMENT REPLACEMENT ...
4,938,000.
4,938,000
61122
FY22 VEHICLE/EQUIPMENT REPLACEMENT ..
7,414,000.
7,414,000
61424
. FY24 VEHICLE/EQUIPMENT REPLACEMENT
6,806,000
6,806,000
61723
FY23VEHICLE/EQUIPMENT REPLACEMENT ..
8,138,000
8,138,000
63421
FY21 VEHICLE/EQUIPMENT REPLACEMENT
9,968,000
9,968,000.
-63922
. FLEET BAYS PLUMBING RENEWAL
141,000
141,000
65119
FY19 VEHICLE/EQUIPMENT REPLACEMENT
. 3,030,000
3,030,000
65618
FLEET MANAGEMENT STAIRS RESTORATION
35,000.
35,000
65718
. FLEET MANAGEMENT WAREHOUSE CEILING
30,000
30,000
65918
FLEET MANAGEMENT.LED LIGHTING
75,000
75,000
66118
FLEET MANAGEMENT BAYS. PAINTING
120,000.
120,000
68122
. FLEET 40 YEAR RE -CERTIFICATION
.35,000
35,000
68222
FLEET ENHANCEMENTS PHASE 11 UPGRADE ...
150,000
....
150,000
MIAMSEACH
PROJECT " PROJECT NAME
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY .
Previous Years FY 2022 FY 2023 FY 2024 FY 2025 FY 2026
ATTACHMENT A
Future Total
68322" FLEET SECURITY CAMERAS.-,
118,468
157,000
GO#37: SIDEWALK IMPROVEMENTS
157,000 "
68422 FLEET WAREHOUSE WATERPROOFING AND ROOF REPAIR
7,800,000
145,000
GO#31: OCEAN DRIVE CORRIDOR
145,000
68522 FLEET GATE
38,000,000
51,000
GO#34: ABOVE GROUND IMPROVEMENTS
51,000
68622FLEET PARKING LOT RESURFACING
23,000,000
71,000.
. GO#35: FLAMINGO PARK NEIGHBORHOOD
71,000
69470 FLEET/SANITATION FIRE ALARM SYSTEM
42,900
27719
GO#36: WASHINGTON AVE. CORRIDOR
42,900
Fund Total:
PROPERTY MANAGEMENT FUND
20,508,900
8,023,000
8,539;000- 6,806,000 4,938,000! 5,107,000:
53,921,900
PROPERTY MGMT FACILITY GENERATOR '
250,000
27919
GO#39: SEAWALLS & SHORELINES -
250,000
Fund Total: •
0COMM NICATIONS FUND'
250,000
28019
_
250,000'
22018 ' FIBER COMMUNICATIONS INSTALLATION
292,000
28119
GO#41: LA GORCE NEIGHBORHOOD
292,000
23119 GO#49; PUBLIC SAFETY RADIO SYSTEM'
667;718
28219
GO#44: NORTH SHORE NEIGHBORHOOD
667,718
68450 BLDG DEV PROCESS ENT SYSTEM'
1,600,000
68219
GO#33: STREET TREE MASTER PLAN
1,600,000
' Fund Total:
2,559,718.
-
- - -
- 2,559,718
61790 MBPD OFF-DUTY EMPLOYMENT SOFTWARE
60,000
68619
GO#43: BIKE LANES & SHARED USE PATH
60,000
68450 BLDG DEV PROCESS ENT SYSTEM
58,468
Fund Total• .
58,468
NEIGH
Fund Total:. 118,468
FUTURE BONDS NEIGHBORHOOD
G.O.FGO
-
118,468
24619
GO#37: SIDEWALK IMPROVEMENTS
3,900,000
3,900,000
7,800,000
27319
GO#31: OCEAN DRIVE CORRIDOR
18,000,000
20,000,000
38,000,000
27519
GO#34: ABOVE GROUND IMPROVEMENTS
23,000,000
-
23,000,000
27619
. GO#35: FLAMINGO PARK NEIGHBORHOOD
20,000,000
20,000,000
27719
GO#36: WASHINGTON AVE. CORRIDOR
9,000,000
9,000,000
27819
GO#38:STREET PAVEMENT.
12,100,000
12,100,000
24,200,000
27919
GO#39: SEAWALLS & SHORELINES -
5,000,000
5,000,000
28019
GO#40: 41 ST. CORRIDOR
13,500,000
13,500,000
28119
GO#41: LA GORCE NEIGHBORHOOD
14,000;000
14,000,000
28219
GO#44: NORTH SHORE NEIGHBORHOOD
8,000,000
8,000,000
68219
GO#33: STREET TREE MASTER PLAN
2,500,000
2,500,000
68419
GO#42: TRAFFIC CALMING
500,000
500,000
68619
GO#43: BIKE LANES & SHARED USE PATH
2,500,000
2,500,000
Fund Total• .
90,000,000
78,000,000
168,000,000
LI IT UI' MIAMI ISLA%.n
I.AMf B EACH
FY 2022 - 2026 CAPITAL IMPROVEMENT. PLAN BY FUNDING SUMMARY .
PROJECT 'PROJECT NAME' Previous Years FY 2022 FY 2023 FY 2024 FY 2025 FY 2026
ATTACHMENT A .
Future Total -
28319
GO#45: FIRE STATION #1
6,000,000"
6,000,000
28419
'GO#46: OCEAN RESCUE NOBE FACILITY
4,000,000
4,000,000
28619
GO#51: FIRE STATION #3
10,000,000,
10 000 000 '
28719
GO#53: SECURITY FOR PUBLIC SPACES
21350,000
2,350,000
28819
GO#54:MARINE PATROL FACILITY -
700,000
700,000
68519'
GO#48:. POLICE HQ FACILITY
4,500,000
4,500,000
68919
GO#52: LED LIGHTING IN PARKS
759,000'
759,000
69019
GO#55: STREET LIGHTING IMPROVEMENTS
6,500,000
6,500,000
5,000,000
Fund Total:
34,809,0001
- 34,809,000,
25019
GO#1:72 ST. COMMUNITY COMPLEX
43,000,000
4J,000,UUU
25419'
GO#5: FLAMINGO PARK &-YOUTH CENTER
15,150,000
15,150,000
25519
GO#6: FISHER PARK
105,000
105,000
25619
GO#7: LA GORCE PARK
150,000
150,000
26019
GO#11: MUSS PARK
250,000
250,000
26219
GO#13: N.SHORE PARK & YOUTH CENTER
2,185,000
2,185,000
26719
GO#23; BAYWALK PEDESTRIAN BRIDGE -
5,000,000
5,000,000
26919
GO#27: LOG CABIN
- 1,076,000
1,076,000
27019
GO#28: ART DECO -MUSEUM -
- 2,000,000 -
2,000,000
27119
'GO#29: WEST LOTS
4,000,000
4,000,000
67519
GO#14: PALM ISLAND PARK
231,000
231.,000.
67619
GO#16: PINETREE PARK
700,000
700,000
-67719
GO#20:.SOUTH POINTE PARK.
480,000
480,000
67919
GO#22: TATUM PARK
840,000
840,000.
68019
•GO#25: WATERWAY RESTORATION..
6,000,000
6,000,000
Fund Total:
81,167,000,
81,167,000,
20124
ALLISON ISLAND NORTH
6,154,321
6,154,321
20224
NORMANDY SHORES
29,147,027.
29,147,027
20323
LA GORCE ISLAND
9,104,921
9,104,921
20324
BELLE ISLE
4,550,621
4,550,621
20422
FLAMINGO. NEIGHBORHOOD
120,000,000
120,000,000
M. !AM BEACH
PROJECT PROJECT NAME'
CITY OF MIAMI BEACH
FY 2022- 2026 CAPITAL IMPROVEMENT.PLAN BY. FUNDING SUMMARY
Previous Years FY 2022 'FY 2023FY 2024 FY 2025
ATTACHMENT A .
FY 2026 Future Total
. 20424"
: BISCAYNE BEACH
'20,445,421.
20,445,421 .
20522
NAUTILUS NEIGHBORHOOD
29,486,421
29,486,421
20524
BISCAYNE POINT'
13;266 321
13,266,321
20624
CENTRA4BAYSHORE
7 963,400.
7,963,400
20724
INDIAN CREEK PARKWAY
9,217,121
9,217,121'
20824
PARK VIEW ISLAND
.
... 4 759 121
4 759 121
,
20922'
, NORMANDY ISLES DRAINAGE IMPROVEMENT
" . 164,000,000
164,000,000
20924
STAR ISLAND'
6,032,621
6,032,621'
.'21122
SUNSET ISLAND 1
.. ... ...
5;319 421
5,319,421.
. 21,222'
, SUNSET ISLAND 2
- _
7,446 121
7,446,.121
22320
LAKEVIEW NEIGHBORHOOD IMPROVEMENTS
25,600,000
25,600,000
22418
MT. SINAI STORMWATER PUMP STATION
13;227 421 -
13,227,421
22720
: PUBLIC WORKS FACILITY -PUMP STATION '
_ _ _ .
2,300,000.
2,300 000
- 23220
NORTH SHORE NEIGH. IMPROVEMENTS -
- - - -
- 40,627,421
40,627,421-
-'23240
LA GORCE NEIGHBORHOOD IMPROVEMENTS
40,000,000
40,000,000
23270
CITY CENTER COMMERCIAL DISTRICT BPB
40 227,421
40,227,421 '
24020
ORCHARD PARK
13,688,421
13,688,421
24120
TOWN CENTER
45,544,504
45,544,504
`FWS FUTURE
" Fund Total:,
WATER & SEWER
i 45,544,504♦ 1.64,000,000' ;
- 448,563,542'
658,108,046`
20422
FLAMINGO NEIGHBORHOOD.
94,000,000
94,000,000
20527
FDOT UTILITIES RELOCATION
17,000,000
17,000,000 .
20922
NORMANDY ISLES DRAINAGE IMPROVEMENT
128,000,000
128,000,000
22320
LAKEVIEW NEIGHBORHOOD. IMPROVEMENTS.,
15,400 000
15 400 000
22418'
MT. SINAI STORMWATER PUMP STATION
6,500,000
6 500,000 .
22720
PUBLIC WORKS FACILITY -PUMP STATION
2,990,000
2,990,000
23220
NORTH SHORE NEIGH. IMPROVEMENTS
19,500 000
19,500,000
23240
LA GORCE NEIGHBORHOOD IMPROVEMENTS..
- -
40,000,000.
40,000 000
23270
CITY CENTER COMMERCIAL DISTRICT BPB
14,560,000
14,560,000
24120
TOWN CENTER
42,000,000
42,000,000
- 28220
WASTEWATER MANHOLE REHABILITATION
1,639,091 .1,688,263
3,327,354. -
M I.AM I EAC
PROJECT PROGRAM
& CULTURAL DEPARTMENT
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY PROGRAM
Previous Years FY 2022 FY 2023 FY 2024 FY.2025 .
ATTACHMENT B
FY 2026. Future Total
20377
AIPP MB CONVENTION
7,530,797
7,530,797
22618
AIPP FIRE STATION 2'
95,334
95,334
22718 •
AIPP FLAMINGO PARK PROJECT
194,000
194,000
22918
AIPP LUMMUS PARK PROJECT
116,000
116,000
65922
TOBIAS REHBERGER OBSTINATE LIGHTHOUSE
85,000
85,000
i
64160 PAINTING & LIGHTING OF BRIDGES
7,936,131 85,000
- 8,021,131
JPW ADMINISTRATION
9,462,000
9,462,000
65519 BRIDGE REPAIRS FYI
60,875
60,875
JPW ENGINEERING
13,374,900 350,000' -
13,724,900-
22920 . CITYWIDE BRIDGES
925,202 750,000 750,000 800,000
3,225,202
25750 WEST AVE BRIDGE OVER COLONS CANAL
71145,127
7,145,127,
SPARKING ADMINISTRATION
8,070,329 750,000 750,000; 800,000 -
10,370,329
jTOURISM & CULTURAL DEPARTMENT
771,000
000629,917,548,
i
64160 PAINTING & LIGHTING OF BRIDGES
1,585,000 -
1,585,000
67140 81 ST ST PEDESTRIAN BRIDGE
180,000
180,000
1,765,000'
1,765,000'
AND RECREATION CTR
2,500,000
2,500,000
28170 CONVENTION CENTER PARK
9,462,000
9,462,000
28180 CONVENTION CENTER - CARL FISHER
3,912,900 350,000
4,262,900
13,374,900 350,000' -
13,724,900-
ECMO CONVENTION CENTER DISTRICT
j
28160 CONVENTION CENTER RENOVATION
615,421,648
615,421,648
SPARKING ADMINISTRATION
21618 CONVENTION CENTER GARAGE EQUIPMENT
TOTAL
771,000
000629,917,548,
771,000,
IAMIFY
PROJECT PROGRAM
• ....
CITY OF MIAMI BEACH"
2022"- 2026 CAPITAL IMPROVEMENT PLAN BY PROGRAM
Previous Years. FY 2022 FY.2023 FY 2024 FY 2025.
ATTACHMENT B
FY 2026, Future Total .
ENVIRONMENTAL
[CAPITAL IMPROVEMENT PROGRAM
I "
"'21016 BAYWALKPHASE2
386,000
386,000
. . 211,19 ' BAYWALK I OTH TO 12TH STREET ' . ' , . •...
310,000 ....
r
310,000
28070 MIDDLE BEACH REC. CORRIDOR PH III
2,675,0002, "
675,000 "•
61920 MAURICE GIBB SOIL REMEDIATION - "
1,092,000-
.
1 092 000 "
- ,
4,463.0001 ..
4,463,000i
k
JENVIRONMENT SUSTAINABILITY'
'
62719 FLEET MGMT FACILITY REMEDIATION
111,000 ..
..
111,000'
62819 . LAKE 'PANCOAST,MANGROVE LIVING SHORELINE
30,000
1,450,000
-.1,480,000 "
65822 • MIAMI BEACH MOORING FIELD
156,000
310,000
466,000 .
68019 r GO#25: WATERWAY RESTORATION "
6,000,000
6,000,000
69520 " WATERWAY RESTORATION
250,000
250,000
TOTAL:
391,OODi :
4,854,000
156,000 {
156,000
7,450,000i"
7,450,000
310,000!
310,000..
8,307 006
i.
• •••
EQUIPMENT
(BUILDING, -
68450- BLDG DEV. PROCESS ENT SYSTEM _
1,658,468
1,658,468;'
` [FACILITIES & FLEET MANAGEMENT
I"
21818 PROPERTY MGMT FACILITY. GENERATOR:
350,000
350,000
23118:.. FIRE STATION 4"SECURITY ENHANCEMENT
:50,683.
50,683 :.
60007 :POLICE STATION NEW GENERATOR
. 555,000
555,000.
60020 • FLEET MGMT-GENERATOR TRANSFER•SWITCH
100,000
100,000.
60057. FIRE STATION 3.EMERGENCY GENERATOR
125,200'
r.
125,200 :.
65821 : FILIMORE ESCALATOR REPAIRS
162,219
162,219
" 66720 COLONY THEATER -SOUND AND VIDEO:
107,000
107,000" "
67920. SMART BUILDING.AUTOMATION SYSTEM",
100,000
r.
100,000
.....1,343,102;
,;
100,000
107:000. ..
11,550:102!.
-
" [FLEET MANAGEMENT
60326 FY26VEHICLE/EQUIPMENT REPLACEMENT
5,107,000 5,107,000
60417 : FY20 VEHICLE/EQUIPMENT REPLACEMENT
7,468,000
7,468,000
60425 FY25 VEHICLE/EQUIPMENT REPLACEMENT .
4,938,000
4,938,000 .
61122 FY22 VEHICLE/EQUIPMENT REPLACEMENT
7,414,000
7,414,000,
61424 FY24VEHICLE/EQUIPMENT REPLACEMENT6,806,000..
6,806,000
61723 FY23 VEHICLE/EQUIPMENT REPLACEMENT .
8,138,000
8,138,000
.
I)
PROJECT PROGRAM
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN. BY PROGRAM
Previous Years FY 2022 FY.2023 -FY 2024 FY. 2025,
ATTACHMENT B
FY 2026 Future Total
63421 FY21 VEHICLE/EQUIPMENT REPLACEMENT
9,968,000.
. 668,000
9,968,000
651.19 . FYI VEHICLE/EQUIPMENT REPLACEMENT
3,030,000
1,500,000,
3,030,000
- 1,500,000,
20,466,0001.
7,414,000: 8,138,000? . 6,806,000 4,938,000.
5,107,000. - 52,869,000; .
IT SUPPORT
22218 NORTH BEACH YARD
59,263
64718 MUNIS / ENERGOV/ ERP.PR.
683,165,
668,225
683,165'
(PARKING ADMINISTRATION
28319 GO#45: FIRE STATION #1
4,000,000,
6,000,000
68022 SKIDATA GARAGE SOFTWARE, UPGRADE.
28600 NSPYC EXTERIOR CAFE AND RESTROOMS
475,000,
475,000
PARKS AND RECREATION
8,078,425, ' .
400,000, 6,312,000"
62823 SCOTT RAKOW ICE RINK REFRIGERATION .
(ENVIRONMENT SUSTAINABILITY
-1,128,000`
1,128,000
(POLICE CHIEF OFFICE
64318 BAYSHORE GREEN WASTE FACILITY
750,000
20297 . EXPANSION OF CITY WIDE SURVEILLANCE
180,000_
180,000
21620 SECURITY CAMERAS ON BEACHWALK 23.46 - '
903,000
903,000
.22118 ENTERTAINMENT DISTRICT CAMERAS
-170,000
170,000
22819 - GO#57: CAMERAS- ENTERTAINMENT DIST.
1,490,000
1,490,000
-28519 GO#47: LICENSE PLATE READERS
1,950,000.
1,950,000
61790 MBPD OFF-DUTY EMPLOYMENT SOFTWARE
60,000.
60,000
68819 GO#50: CAMERAS- BUSINESS DIST.
825,000
825,000
69119 GO#56: CAMERAS- BEACHWALK
700,000.
700,000.
6,278,000' .
..
6,278,00011
PUBLIC SAFETY COMMUNICATIONS
23119 : GO#49: PUBLIC SAFETY RADIO SYSTEM
. - -TOTAL:
PUBLIC BUILDINGS
10,367,718
40,796,453
9,373,0001 6,806,000 1 4,938,0001
10,367,71 B'
5,107,000175,009,453 - -
.GENERAL
jBUILDING
26990 SECOND FL RENOVATION -BUILDING DEPT
1 869 898'
1 869898
'CAPITAL IMPROVEMENT PROGRAM
_ # -
20627 NORTH SHORE BANDSHELL CANOPY
. 668,000
668,000
21721 REAL TIME CRIME CENTER BUILDOUT
1,500,000,
- 1,500,000,
21821 MBPD HEADQUARTERS RENOVATION
181,937
181,937
22218 NORTH BEACH YARD
59,263
59,263
24530 SUNSET ISLANDS.1 &2 GUARDHOUSE
668,225
668,225
28319 GO#45: FIRE STATION #1
4,000,000,
6,000,000
10,000,000
28600 NSPYC EXTERIOR CAFE AND RESTROOMS
1,001,000
400,000 '312,000
1,713,000
8,078,425, ' .
400,000, 6,312,000"
14,790,425, "
(ENVIRONMENT SUSTAINABILITY
64318 BAYSHORE GREEN WASTE FACILITY
750,000
750,000
I V 1 Al Y l I EAC
PROJECT PROGRAM .
CITYOF MIAMI BEACH
FY 2022- 2026 CAPITAL IMPROVEMENT PLAN BY PROGRAM
Previous Years FY 2022 FY 2023. FY 2024 FY 2025
ATTACHMENT B
FY 2026 Future Total
jFACILITIES & FLEET MANAGEMENT
354,000
354,000
21120 MIAMI BEACH GOLF CLUBHOUSE ROOF
20721 GREENSPACE FACILITY RENOVATION
542,000
200,000 443,000
643,000
22720 PUBLIC WORKS FACILITY-PUMP STATION
28819 GO#54: MARINE PATROL FACILITY
2,000,000 700,000
5,290,000 5,290,000
27019 GO#28: ART DECO MUSEUM
2,000,000
2;000,000
65622 :SHANE ROWING CENTER ROOF REPLACEMENT
310,000
61,000
61,000
66021 SOUTH POINTE PARK RESTROOMS RENOVATION
86,000
100,000
86,000
61822 " MB GOLF CLUB DRIVING RANGE NETTING
86,000'
261,000 " 2,443,000'
5,290,000` 8,080,000'
FIRE PREVENTION
70,000
0
28619 _ GO#51: FIRE STATION #3
10,000,000
10,000,000
(FIRE RESCUE
9
28419 GO#46: OCEAN RESCUE NOBE FACILITY
1,000,000
4,000,000
5,000,000
62919 OUTDOOR TRAINING FACILITY (FIRE)
200,000
200,000
1,000,000
4,000,000, 200,000{ ;
5,200,000'
!PARKS AND RECREATION
I
' LUYLU NUKIrl JrIUKL tlAIVUZINCLL KCAK JCAI INU
Itsp,uyu - - - -
- - I t5i1,000
62723 SCOTT RAKOW ICE RINK PERIMETER BOAR
354,000
354,000
21120 MIAMI BEACH GOLF CLUBHOUSE ROOF
188,000 354,000;
542,000
,POLICE CHIEF OFFICE
184,000
j
28819 GO#54: MARINE PATROL FACILITY
2,000,000 700,000
2,700,000
jTOURISM & CULTURAL DEPARTMENT
20421 - . NORTH SHORE.BANDSHELL REAR CANOPY
310,000
310,000
(FACILITIES & FLEET MANAGEMENT
1
20820 MB.GOLF COURSE STORAGE TANK
97,909
97,909
21120 MIAMI BEACH GOLF CLUBHOUSE ROOF
257,000
257,000
60921 N. SHORES GOLF CLUB�CLUBHOUSE ROOF
184,000
184,000
-354,909 184,000 -
538;909.
,PARKS AND RECREATION
20108 " MIAMI B. GOLF COURSE PRACTICE TEE
124,000
124,000
20623 MIAMI BEACH GOLF. COURSE RENOVATION
6,000,000 6,000,000
21420 MB GOLF COURSE IRRIGATION PUMP
100,000
100,000
61822 " MB GOLF CLUB DRIVING RANGE NETTING
114,000
114,000
61922 MB GOLF CLUBHOUSE PAINTING
70,000
70,000
ATTACHMENT B
CITY OF MIAMI BEACH
MI A ` H FY 2022 - 2026 CAPITAL. IMPROVEMENT'PLAN BY PROGRAM
PROJECT PROGRAM Previous Years . FY 2022 FY 2023 FY 2024 FY 2025. FY 2026 Future . Total .
63622 MB GOLF CLUB REEL GRINDERS REPLACEMENT. 71,000, 71,000
681.20 NORMANDY SHORES GOLF CLUB PUMPS 196;000 196000
24630. FLAGLER MONUMENT SOLAR ILLUMINATION
224,000. 185,000 70,000. 196,000
- .6,000,000 6,675,000
IPARKS LANDSCAPE MANAGEMENT
820,000
820,000
60325 NORMANDY SHORES GOLF CLUB TEE RENO
125,000
125,000
60824 MB GOLF CLUBHOUSE CARPET REPLACEMENT
42,000
42,000
62023 MB GOLF CLUB KITCHEN FLOOR REPLACEMENT
43,000
43,000
62122 NORMANDY SHORES GOLF.CARPET REPLACEMENT
40,000
40,000 .
20025 PENN GARAGE -ELEVATOR RENEWAL
- 208,000 42,000
250,000
24630. FLAGLER MONUMENT SOLAR ILLUMINATION
289,000
289,000
60031 WATER TOWER RESTORATION STAR ISLAND,
820,000
820,000
64421 MBPD CUBAN MONUMENT RESTORATION
26,545
- 26,545
639,245 82.0,000
- 1,459,245
jTOURISM & CULTURAL DEPARTMENT
I
20011 WORLD WAR MEMORIAL
62,000
62,000
27830 PARKING GARAGE AT 1262 COLLINS AVE
9,738,694
9,738,694
28010 COLLINS PARK PARKING GARAGE
27,590,271
27,590,271
60119 , '17TH STREET PARKING GARAGE COATING'
1,4001000
1,400,000,
50,074,965. 1,000,000,
- 51,074,965
FACILITIES & FLEET MANAGEMENT
I
20022 16TH ST. GARAGE -JOINT REPLACEMENT
200,000.
200,000
20025 PENN GARAGE -ELEVATOR RENEWAL
218,000
500,000 718,000
-20026 7TH STREET GARAGE -ELEVATOR
400,000 400,000
20125 1755 MERIDIAN GARAGE ELEVATOR
500,000 500,000
ATTACHMENT B
CITY OF MIAMI BEACH
MI Al Y l I B EA H FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY PROGRAM
PROJECT PROGRAM .Previous Years-, FY 2022 FY 2023. FY 2024 FY 2025. FY 2026, Future Total
20225
SUNSET HARBOUR GARAGE ELEVATOR 500,000
500,000
20325
SUNSET HARBOUR GARAGE -ROOFTOP, 300,000
300,000
20823
1755 MERIDIAN GARAGE FIRE SPRINKLER 300,000.
300,000 .
20923
SUNSET HARBOUR GARAGE SPRINKLER 300,000
300,000
21121
7TH ST GARAGE -ENTRANCE FLOOD CONTROL 278;000
278,000
21124
16TH ST GARAGE -EXTERIOR RENEWAL 400,000
400,000
21224
1755 GARAGE GENERATOR 200,000
200,000
21324
SUNSET'HAR30UR GARAGE GENERATOR
60522
200,000
25,000
200,000
21920
RECONFIGURATION OF SANITATION AREA
330,000.
7TH STREET GARAGE -INTERIOR DRAINAGE 30,000..
30,000
60622
330,000
22120
12TH ST GARAGE -ELEVATOR REPLACEMENT
174,450,
25,000
60624
17TH STREET GARAGE -EXTERIOR COATING 300,000
174,450
22122
SUNSET'HAR30UR GARAGE SCREENING
50,000
200,000
7TH ST GARAGE -TRAFFIC COATING 150,000
150,000
200,000
22220
17TH ST. GARAGE -ELECTRICAL FEEDER,
225,000
225,000
26290
17TH ST. PARKING GARAGE MAINTENANCE
235,000
235,000
60023
16TH ST GARAGE -PLUMBING SYSTEM UPDATE.
75;000
75,000
60025
PENN GARAGE -ROOFTOP -STAIRS ELEVATOR
-
- -
40,000 -
- _ 40,000
60120
13TH STREET PARKING GARAGE COATING
800,000,
800,000
60124
7TH STREET GARAGE -LANDSCAPING
120,000
120,000
60125
1755 MERIDIAN GARAGE OFFICE ROOF
300,000
300,000
60130
13TH ST GARAGE FIRE ALARM
46,580,
46,580
601.90
ANCHOR GARAGE ELEVATOR REPLACEMENT
357,995
357,995
60224
7 ST GARAGE -SUPERSTRUCTURE RENEWAL
250,000
250,000
60324
16TH STREET GARAGE{GENERATOR
250,000
250,000
60422
7TH ST GARAGE -FIRE SPRINKLER & PUMP
300,000
300,000
.60424
PENN GARAGE -GENERATOR RENEWAL
200,000
200,000
60522
12TH ST GARAGE- INT. FLOOR DRAINAGE 25,000
25,000
60524
PENN GARAGE -PLUMBING SYSTEM UPDATE 75,000
75,000
60620
7TH STREET GARAGE -INTERIOR DRAINAGE 30,000..
30,000
60622
13TH ST. GARAGE -PARKING SIGN RENEWAL 30,000
30,000.
60623
7TH STREET GARAGE -STAIRWELL RAILING 25;000
25,000
60624
17TH STREET GARAGE -EXTERIOR COATING 300,000
300,000
60722
42 ST GARAGE -STAIRWELL WATERPROOFING 50,000
50,000
60723
7TH ST GARAGE -TRAFFIC COATING 150,000
150,000
60724
42ND STREET GARAGE -FIRE SPRINKLER 40,000
40,000
60822
1755 MERIDIAN GARAGE LED LIGHTING
150,000
150,000
60823
:PENN GARAGE -FIRE SPRINKLER RENEWAL
300,000
300,000
60922
SUNSET HARBOUR GARAGE SEALING, .
75,0.00
75,000 .
60923
PENN GARAGE -FIRE PUMP REPLACEMENT
100,000
100,000"
61021
MB POLICE GARAGE CONCRETE SPALLING
833,000
833,000
61022
SUNSET HARBOUR GARAGE -TRAFFIC COATING
303,000 "
303,000
61023
PENN GARAGE -FIRE ALARM. SYSTEM
35,000
35,000
611.18
7TH STREET, GARAGE UPGRADE LIGHTING
127,9.93'
127,993
61123
12TH ST GARAGE -STAIRWELL DOOR
32,000.
32,000
6.1217
13TH ST. GARAGE-WINDOW/GLASS BLOCK
35,350
35,350
61218
" 7TH STREET, PARKING GARAGE ROOFTOP
140,251
_
_
140;251-
61223
12TH ST. GARAGE -STAIRWELL RAILING .
25,000
25,000 .
61317
13TH ST. GARAGE -STAIRWELL RAILING
50,000,
. 50,000
61323
42ND ST GARAGE -PLUMBING SYSTEM UPDATE:.
75,000
75;000
.. 61417
1.7TH ST GARAGE INT. FLOOR DRAINAGE
-
30,000
- - -
- - 30,000 .
61423
1755 GARAGE FIRE PUMP REPLACEMENT
100,000
100,000
..
_ 61517
17 ST GARAGE -STORAGE SPACE RENOVATION
100;000
-. -
- 100:000
61617
17TH ST GARAGE -PLUMBING SYSTEM UPDATE.
75,000
75,000
61623
SUNSET HARBOUR GARAGE -FIRE ALARM
35,000
35,000
"
61660
13TH STREET PARKING. GARAGE ELEVATOR
325,300
_
_ _
325,300
61717
42ND ST. GARAGE-50YR"CERTIFICATION
312,090
312,090
61718
16TH STREET. GARAGE FIRE SPRINKLER
1,444,000
1,444,000.
61817
42ND ST. GARAGE -STAIRWELL RAILING
25,000
25,000
61818
16TH STREET GARAGE STAIRWAYS
101,200
101,200 .
61917
1755 MERIDIAN GARAGE FLOOR DRAINAGE
200,000
200,000.
61918
16TH STREET GARAGE ROOF AND DECK.
1,808,000
1,808;000
61930
17TH STREET PARKING GARAGE ELEVATOR "
876,000
876,000
62017
SUNSET HARBOUR GARAGE LED LIGHTING
300,000
300,000
62100
42ND ST. PARKING GARAGE MAINTENANCE
400,000
- -
400;000 .
62218
13TH STREET GARAGE LIGHTING (LED)
86,000,
86 000
62223
12TH STREET.OVERHEAD GATE RENEWAL
61,100
611100.
62418
12TH STREET GARAGE ROOF AND DECK.
299,806
299;806
62422
16TH STREET GARAGE HVAC RENEWAL
34,000
.34,000
AAI AM I EAC H.
PROJECT PROGRAM
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY PROGRAM
Previous Years FY 2022 FY.2023 FY 2024 FY. 2025,
ATTACHMENT B .
FY 2026 Future Total
62518
1755 MERIDIAN GARAGE ROOF AND DECK
500,000,
500,000
62522
13TH STREET GARAGE NEON RENEWAL
67,000
67,000
-62621
7TH STREET GARAGE-OFFICE/RESTROOM
36,000
36,000
62721
16TH STREET GARAGE-OFFICE/RESTROOM
30,000
30,000
62821
16TH STREET GARAGE -ROOFTOP RENEWAL
34,000
34,000
63021
PENN, GARAGE -HVAC RENEWAL
85,000 35,000.
120,000
63121
PENN GARAGE -TRAFFIC COATING -RETAIL,
100,000
100,000
63221
12TH STREET GARAGE -DOMESTIC WATER79,000
79,000
63321.
13TH STREET GARAGE40YR CERT.
300,000.
300,000 .
64018
17TH ST GARAGE 40YR RECERTIFICATION
753,427.
755,427
643.19
' PENN GARAGE -NEW LIGHTING DISPLAY
135,000
135,000
64419
13TH STREET GARAGE - WATER SYSTEM
33,000
33,000
64519
17TH STREET GARAGE- IST_FL OFFICE
45,000
45,000
-64719
7TH STREET GARAGE -DOOR REPLACEMENT
50,000
50,000
65019
16TH STREET GARAGE (ANCHOR) - PAINT -
100,000
100,000
65521
16TH STREET CANVAS AWNING RENEWAL
56,560
56,560
65621
: 42ND STREET GARAGE FALL PROTECTION
151,500
151,500
66121
12 ST. PARKING GARAGE FIRE ALARM
50,000
50,000
67118
ANCHOR - INTERIOR FLOOR DRAINAGE
30,000
30,000 .
672.18
PENN GARAGE -SEALING OF SUPERSTRUCTURE'
25,000
25,000
67318
PENN GARAGE -INT. SURFACE RESTORATION
95,000
95,000
67418
- 42ND STREET GARAGE -DISPATCH AREA
100,000
100,000
67520
7TH STREET GARAGE -ROOFING REPAIRS
45,756
45,756
67618
12TH STREET GARAGE -ROOF RENEWAL ..
64,000
64,000
67818
17 ST GARAGE -GENERATOR REPLACEMENT
120,000
120,000
67922
16TH STREET GARAGE -EXTERIOR PAINT RENEWAL &
WATERPROOFING
550,000
550,000.
68018
. 42ND STREET GARAGE -GENERATOR
96,550
96,550
68118
42ND ST GARAGE- INTERIOR DRAINAGE
34,000
34,000
68220
7TH ST GARAGE SURFACE RESTORATION ..
95,000
95,000
69310
7TH ST. GARAGE FIRE ALARM SYSTEM .
51,087
51,087
69370
42ND ST. GARAGE FIRE ALARM SYSTEM
51,087
51,087
69380
42ND ST GARAGE ELEVATOR REPLACEMENT
565;145
565,145'
11,514,127
3,471,000 2,789,100 1,785,000 2 325,000
500,000' 22,384,227
.-MIAM.I BEACH. .
PROJECT PROGRAM
CITY OF MIAMI BEACH-
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY PROGRAM
Previous Years FY 2022 FY. 2023. FY 2024 FY 2025
ATTACHMENT B .
FY 2026 Future Total .
(PARKING ADMINISTRATION
I
22020 GARAGE -LICENSE PLATE RECOGNITION
855,000 '.
855,000
26100 GARAGE SECURITY CAMERA SYSTEM
1,413,057
1,413,057
TOTAL
2,268,057 'i'
� _
�.� .� ��� 00.
_ , 2,268057
r
500,000 75,727,2491
PARKING LOTS
CAPITAL IMPROVEMENT PROGRAM
20518 SURFACE LOT AT BISCAYNE BEACH
907,029
907,029'
26340 PENRODS AT 1 OCEAN DR. PARKING LOT..
2,954,113..
2,954,113
27480 SURFACE LOT P48 BASS MUSEUM LOT
220,000 "
220,000
29580, LOT 9D P86-6976 INDIAN CREEK DRIVE
468,000
468,000
4.549,142 '.
_
4,549,1421
(FACILITIES & FLEET MANAGEMENT
I
2871.0 P14 6TH ST & COLLINS PARKING LOT
341,000
341,000.
603.17 CITYWIDE PARKING LOTS IMPROVEMENTS
150,000 150;000 150,000 150,000.
600;000
..... .. .... _ ... .TOTAL:
341,0001.
4,890,142
150,000; 150,0001, , 150,000, 150,000'
150,000 150,0001 150,0()01 150,000
941,000:
5,490,142 -
PAPICS
[CAPITAL IMPROVEMENT PROGRAM
i
20418 COLLINS PARK PERFORMING ARTS VENUE
800,000
400,000 422,000
1,622,000
20918 BRITTANY BAY PARK '.
1,709,729
1,709,729 ..
22750 ALTOS DEL MAR PARK
4,995,492
4,995,492
23200 . FLAMINGO PARK
1,8;193,130
18,193,130
25019 GO#1: 72 ST. COMMUNITY COMPLEX
10,800,000
43,000,000
53,800,000
25380 BAND SHELL MASTER PLAN
2,633,372
2,633,372
25419 GO#5: FLAMINGO PARK & YOUTH CENTER
15,400,000
15,150,000
30,550,000.
26219: GO#13: N.SHORE PARK & YOUTH CENTER
3,5.40,000
2,185,000
5,725,000
26500 KAYAK LAUNCH DOCKS.
644,080
.644,080.
26719 GO#23: BAYWALK'PEDESTRIAN BRIDGE
10;000,000
5,000,000 q
15,000,000
26819 GO#24: MIDDLE BEACH BEACHWALK PH3
4,500,000
4,500,000
.27930 SHARED PATH ON PARKVIEW ISLAND PARK.
320,000
.320,000.
.27950 NORTH BEACH OCEANSIDE PARK
15;792,075
15,792,075
--- 28550 LIFEGUARD -STAND -REPLACEMENTS -
3,3,19,989
3,319,989
28850 MAURICE GIBE PARK REDESIGN
2,628;682
2,628,682.
IA! Y l I EAC H
PROJECT PROGRAM
CITY OF MIAMI BEACH
FY 2022- 2026 CAPITAL IMPROVEMENT PLAN BY PROGRAM
Previous Years FY 2022 FY 2023. FY 2024 .. FY 2025.
ATTACHMENT B
FY 2026 Future Total .
29600 MUSS PARK FACILITY
2,695,000
2,695,000
97,971,549
400,000 65,757,000;
=.
=
164,128,549•
FACILITIES & FLEET MANAGEMENT
26519 GO#18: SCOTT RAKOW YOUTH CENTER
4,053,045
4;053,045
26919 GO#27: LOG CABIN
1,076,000
1,076,000
60720 BEACHWALK TREE WELLS 14-22 STREET
150,000
150,000
4,203,045•
1,076,000 _
-
5,279,045
(PARKS ADMINISTRATION
66322 , NON-MOTORIZED VESSEL KAYAK LAUNCH
70,000, 400,000
470,000
[PARKS AND RECREATION
20023 ALLISON PARKYLAYGROUND REPLACEMENT
795,000
795,000
20123 INDIAN BCH PK PLAYGROUND EXPANSION
792,000
792,000
20187 LUMMUS PARK MUSCLE BEACH UPGRADE
300,000
300,000
20223 LUMMUS PARK PLAYGROUND REPLACEMENT
750,000
750,000
20237 FAIRWAY PARK IMPROVEMENTS
1,428,953
877,000
877,000
3,182,953
20247 CITYWIDE PARKS IRRIGATION SYSTEM
14,275'
156,000
170,275
20300 NORMANDY ISLE PARK TURF INSTALLATION
398,000
465,500
465,500
1,329,000
20321 BEACHVIEW PK PLAYGROUNDREPLACEMENT
505;000
505,000
20423 FLAMINGO PK FOOTBALL FENCE
613,000
613,000
20425 FLAMINGO PARK SOCCER FIELD TURF
281,000
281,000
20523 STILLWATER PARK LIGHTING &SOCCER
481,000 481,000
20577 BELLE ISLE PARK PLAYGROUND
576,500
576,500
20722 FLAMINGO PK PLAYGROUND REPLACEMENT
830,000'
830,000
20723 CRESPI PARK LIGHTING & MICRO SOCCER .
481,000
481,000
20821 BISCAYNE ELEM SHARED FIELD LIGHTING
1,270,170
1,270,170
20822 FLAMINGO PK FOOTBALL STADIUM TURF
1,163,000
1,163,000
20921 NORMANDY ISLE PARK PLAYGROUND .
489,000
489,000
21021 NSPYC KITCHEN & CABINETRY ADDITION'
344,000
7
344,000
21022 WEST LOTS 85-86 ST CONVERSION
2,436,100
2,436,100'
22420 POLO PARK LIGHTING & SOCCER FIELD
857,680
857,680
23018 SOUTH POINTE PARK. LIGHTING
585,000
585,000 .
23518 BATTING CAGES AT NORTH SHORE PARK
203,000
203,000
25119 GO#2i COLLINS PARK
557,287
557,287
25219 GO#3: CRESPI PARK
.184,921
184,921
AMI ' EA H
PROJECT PROGRAM
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY PROGRAM
Previous Years . FY 2022 FY 2023 FY 2024 FY 2025.
FY 2026
ATTACHMENT B
Future Total
25319
GO#4: FAIRWAY PARK
260,000
260,000
25519
GO#6: FISHER PARK
105,000
105;000
25619
GO#7: LA GORCE PARK
150,000.
150,000
25719
GO#8: LUMMUS PARK
4,737,000
4,737,000
25819
GO#9`. MARIORY STONEMAN •DOUGLAS PARK
682,000
682000
25919
GO#10: MAURICE GIBB PARK
4,500,000
4,500,000
26019
GO#1 l: MUSS PARK
250,000
250,000
26119
GO#12: NOBE OCEANSIDE'PARK BEACHWALK
2,000,000
2,000,000
26319
GO#15: PAR 3 / BAYSHORE PARK
15,700,000
15,700,000 .
26419
GO#17: POLO PARK
493,675
493,675
27219
GO#30: SKATE PARK
750,000
750,000
28560
COLLINS PK LIGHTING SOUND SYSTEM
236,000
236,000
29550
CMB SKATEPARK
190,280
190,280
29620.
ALLISON PARK REDESIGN
1,532,000
.1,532,000
60026
BELLE ISLE PARK PLAYGROUND REPLACEMENT
638,000
638,000
60123
CRESPI PARK PLAYGROUND REPLACEMENT
407,000
407,000
60126
MUSS PARK PLAYGROUND REPLACEMENT
638,000
638,000
60223
POLO. PARK PLAYGROUND REPLACEMENT .
476,000
476,000
60226
PARK VIEW ISLAND PARK PLAYGROUND REPLACEMENT
497,000
497,000
60321
CITYWIDE PARKS COURT REPAIRS
105,000
105,000
105,000
105,000
105,000
105;000
630,000
60323
STILLWATER PLAYGROUND REPLACEMENT
570,000
570,000 .
60421
CITYWIDE FITNESS COURSE REPLACEMENT
100,000
100,000
100,000
100,000
100,000
100,000
600,000
60924
NSPYC SAFETY IMPROVEMENTS -FRONT DESK
372,000
372,000
62022
FLAMINGO PARK TENNIS CENTER COURTS
160,000
160,000
63319.
PARK VIEW ISLAND ANNEX - DOG PARK
67,000
67,000
63519
BUOY PARK REFORESTATION IMPROVEMENT
150,000
150,000
64621
CITYWIDE PK LANDSCAPING IMPROVEMENT
200,000.
152,000
248,000
200,000 .,
200,000.
200,000
200,000
1,400,000
65722
FLAMINGO PARK BASEBALL STADIUM STAN
65,000
495,000
560,000
66518
.SECURITY AUDIO SYSTEM FOR All POOLS
100,000
100;000
66920
S. P. PARK-FISHING.PIER RAILING REP
198,000
198,000
67519
GO#14: PALM ISLAND PARK
231,000
231,000
67619
GO#16: PINETREE PARK
700,000
700,000
67719
GO#20: SOUTH POINTE PARK
480,000
480,000
26619 GO#19: SOUNDSCAPE PARK 4,500,000 • 4,500,000
.27119 .GO#29: WEST LOTS 1,000,000 4,000,000 5,000,000
6,251410, 4,000,000, 10,251,410,
'ENVIRONMENT SUSTAINABILITY
65422 WATERWAY MARKERS &'SIGNS
395,000;
-395,000
,FACILITIES & FLEET MANAGEMENT
20110. 28TH STREET OBELISK STABILIZATION
607,230
607,230 ,.
25980 BASS MUSEUM GENERATOR
117,816
.117,816_
26010 .BASS MUSEUM HYDRAULIC ELEVATOR
66,127 ' .
66,127
27780. . MIAMI CITY BALLET WINDOWS
441,799
441,799
28919 GO#26: ROOFS FOR CULTURAL.FACILITIES.
2,932;631
2,932,63T.
60030 .POLICE STATION MEN'S LOCKER ROOM
241,371
241,371•
60038. SOUTH SHORE C.C. FIRE ALARM RENEWAL
.11,370
11,370
60077 FIRE STATION 2 ALARM SYSTEM
99,000
99,000
60225 SUNSET HARBOUR GARAGE INT. FLOOR
34,000:
34,000 "
60418 HISTORIC CITY -HALL HUMIDITY CONTROL.
96,068
96,068 ,.
60420 FIRE STATION 2 -A/C REPLACEMENT'
71,200
71,200
60519 CITY HALL 40 -YR STRUCTURAL
154,800
154,800
60520. MBPD-CONDENSER AND PUMPS
125,000 :.
125,000
60618 " HISTORIC CITY HALL FIRE ALARM
151,618
151,618.
60718 NORTH SHORE PARK YOUTH CENTER A/C
80,000
80,000. "
60719_ UNIDAD ELEVATOR MODERNIZATION
70,000
70,000
60821 CITY HALL -REPLACE RESTROOM EXHAUST
35,000 _
35,000
60920 HISTORIC CITY HALL-VFD REPLACEMENT
200,000
200,000
ATTACHMENT B
CITY OF MIAMI BEACH
MI A E A H, FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY PROGRAM
PROJECT PROGRAM Previous Years FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 Future Total .
61020 CITY HALL -GENERATOR REPLACEMENT 600,000 - 600,000
61100 P.A.L. BUILDING, FIRE ALARM 74,500 74,500
61120 CITY HALL -COOLING TOWER BASE .100,000 100,000
61221
NORM. ISLE POOL LOCKER ROOM & PUMPS
250,000
250,000
61290
CITY HALL FIRE ALARM SYSTEM
293,325
62822
293,325
61320
UNIDAD BUILDING -DOOR RENEWAL
62920
63,000
63,000 .
61321
71ST STREET WELCOME SIGN RENOVATION
BASS MUSEUM EXTERIOR WALL REPAIRS'
40,000
40,000
61419
BEACHFRONT RESTROOMS-RENOVATIONS
138,000 -
- - -
- - 138;000
61420
UNIDAD BUILDING -WINDOW SEAL RENEWAL
1.33,000
40,000 ,
40,000
61521
CITY HALL LOADING DOCK RESURFACING
70,000
70,000
61523
SUNSET HARBOUR GARAGE FIRE PUMP
100;000 -... -
- - 00000
61621
CITY HALL CHAMBER & PRESS ROOM RENO
900,000
900,000
61819
BEACHWALK DRAINAGE - 24 ST TO 46 ST
100,000
100,000
61919
41 ST STREET FOUNTAIN RESTORATION
82,000 -
-
- 82;000
61921
10TH ST. AUDIT. ENTRANCE DRAINAGE
250,000
250,000
62021
COLONY THEATER ELEVATOR
87,000
87,000
62117
FIRE STATION 42 TRAINING TOWER
401,691
.....
401,691
62118
12TH STREET PARKING LIGHTING (LED)
64,000
64,000
62119
BASS MUSEUM - ROOF REPLACEMENT
392,464
392,464.
621.21
BOTANICAL GARDENS RESTROOMS
50,500
50,500
62217
1, 0TH ST AUDITORIUM COATING OF ROOF .
65,650
65,650
62221
COLONY THEATER RESTROOM RENOVATION
73,000
73,000
62321
COLONY THEATER EXTERIOR PAINTING
68,000
68,000
62419
BASS MUSEUM - FREIGHT. ELEVATOR
88,647.
88,647 .
62421
COLONY THEATER LED LIGHTS UPGRADE
-
40,000.
40,000
62519
BEACHWALK DRAINAGES.POINTE - 23 ST
220,000
220,000
62523
ARTISTIC BOLLARDS
750,000
750,000
62622
HISTORIC CITY HALL FRONT ELEVATION
69,000
69,000.
62822
INTERNAL AFFAIRS RESTROOM RENO
139,000
139,000
62920
FIRE STATION #2 WATERPROOFING' 192,000
192,000
62922
BASS MUSEUM EXTERIOR WALL REPAIRS'
39,000
39,000
62923
FLAMINGO PARK HURRICANE WINDOWS
98;000
. 98,000
63019
BUILDOUT 1701 4TH FL FOR HOUSING 133,000
1.33,000
AMIBEACHFY
PROJECT PROGRAM
".
'CITY OF MIAMI BEACH'
2022- 2026 CAPITAL IMPROVEMENT PLAN BY PROGRAM
Previous Years FY 2022 FY, 2023. FY 2024 FY 2025
ATTACHMENT B
FY 2026. Future Total .
63022
MIAMI CITY BALLET EXIT SIGN RENEWAL .
73,000
73,000
63023
HISTORIC CH 2ND.FLOOR RESTROOMS
74,000
74,000
63122
10TH ST AUDITORIUM LED UPGRADE
104,000.
104,000 .
63123
MBPD GARAGE LED LIGHT UPGRADE
110,000
110,000
63222
" COLONY THEATER,EXIT SIGN RENEWAL
36,000
36,000
63223
BOYS.& GIRLS CLUB SECURITY ENCLOSURE,
27,000
27,000 .
63323
MBPD NESS DOCK RENOVATION
77,000
.77,000
63350
POLICE HO ELEVATORS & OTHER PROJECT
384,260 "
_
384,260
63420
NS YOUTH CNTR ROOFTOP A/C RENEWAL
120,000
120,000 .
63422
HISTORIC C. HALL ENERGY EFF. WINDOW
. 52,000
52,000-
63423
NORMANDY POOL LIGHTING IMPROVEMENT
41;000
41,000
63522
NORTH SHORE BANDSH,ELL SIGNAGE REPL.,
97,000
97,000
63523
FIRE STATION 1 BATHROOMS RENOVATION
120,000
120,000
63623
FIRE STATION 1 ROLL -UP DOOR RENEWAL
- 59;000
51,000
63718
SANITATION INTERIOR REPLACEMENT
502,800
502,800
63719
1755 MERIDIAN -CHILLER REPLACEMENT
219,045
211,045
63720
10TH ST AUDITORIUM -LOUVER,
52,000 7
52,000
.. 63721
FIRE STATION #1 ROOF REPAIRS
41,500.
41,500 .
63722
SMART CARD ACCESS SYSTEM -PHASE II
195,000.
195,000
63723
FIRE ADMINISTRATION FLOORING RENEWAL
... 34;000
34,000
63819
SSCC,ROOT MITIGATION & FLOORING REP,
272.
272
63821
MBPD 4TH FLOOR HVAC CONTROLS
312,000
312,000,
63822
1755 ROOF REPLACEMENT
223,000 7
223,000
63823
FIRE ADMIN BLDG UPS SYSTEM RENEWAL ..
39,000
39,000
63919
SMART CARD ACCESS SYSTEM -.PHASE 1
250,000,
-. - - -
250000
63921
1701 MERIDIAN AVE 50 YEAR RECERTIFICATION
50,500
50;500 "
63922
FLEET BAYS PLUMBING RENEWAL
14.1,000
14.1,000
63923
BASS MUSEUM KEYSTONE SEAL
63,000.
63,000
64019
CITY HALL ENERGY EFFICIENT BUILDING
156,000
156,000
64020
CITY HALL CARD ACCESS SYSTEM REPL.
80,436.
80,436
64021
HISTORIC CITY HALL 90 YEAR RECERTIFICATION
66,000
- - -
66 000
64022
777 FOUNTAIN/COURTYARD RENOVATIONS
131,000
131,000,
64023
MIAMI CITY BALLET VARIABLE AIR VALVE
.34,000
34,000
CITY OF MIAMI BEACH -
FY 2022 -'2026 CAPITAL IMPROVEMENT PLAN BY PROGRAM
ATTACHMENT B
PROJECT
PROGRAM
Previous Years FY 2022 FY. 2023 FY 2024 FY. 2025 FY 2026
Future Total .
64121
FIRE STATION #3 40 YEAR RECERT. -
48,700
.48,700
64123
COLONY THEATER.IMPACT GLASS
103,000
103,000
64220
PUBLIC WORKS FACILITY. EXTERIOR
84,914
84,914 .
64221
BASS MUSEUM WINDOW REPLACEMENT
134,710.
134,710
64222
1755 MERIDIAN FRESH AIR INTAKES "
63,00063;000
64223
BASS MUSEUM INTERIOR GALLERY WALL
63,000
63,000
64320
" CITY HALL -COOLING TOWER CONDENSER
90,000
90,000
64321
: BASS MUSEUM CONDENSER WATERpUMPS
45,450
45,450
64322
1755 MERIDIAN ROOF REPLACEMENT,
- ,
62,000
- . ,
- 82,000
64323
MIAMI CITY BALLET ACCESS CONTROL
SQ000
.50,000
64418
THE FILLMORE 4"R RECERTIFICATION
622,298
622,298
64420
CITY HALL RESTROOM RENOVATIONS.
250,000 "
250,000
64422
MBPD GARAGE EXIT SIGNS AND SAFETY
31,000
31,000
64423
MIAMI CITY BALLET UV LIGHT RETROFIT,
33,000
33,000
64521
10TH ST AUDITORIUM HEAT PUMP RENEWAL
191,900
191,900
64522
MBPD MAIN ROOF REPAIRS
136,000
136,000
64523
MIAMI CITY BALLET BOARD ROOM CARPET
88,000
88,000
64618
MIAMI CITY BALLET VARIOUS REPAIRS
.278,250
278,250
6461.9
SURFACE LOTS CITYWIDE LANDSCAPING
100,000
100,000
64622
SCOTT RAKOW YOUTH CENTER LIGHTING
115,000
115,000
64623
BASS MUSEUM GALLERYFLOORRENOVATION
226,000
226,000
64721
MIDDLE BEACH WATER TOWER PAINTING
50,000
50,000
64722
SHANE ROWING CENTER HVAC UNITS REPLACEMENT
61,000
. 61,000
64723
10TH STREET AUDITORIUM SECURITY ENH
34,000
34,000
64819
COLONY THEATER - FIRE ALARM SYSTEM
78,000
78,000
64821
SECURITY ENHANCEMENTS CITYWIDE
500,000
1,000,000 " 500,000 500,000.
2,500;000
64822
SHANE ROWING CENTER DOCK RAMP
413,000
227,000
640,000
64823
BASS MUSEUM TRANQUILITY FOUNTAIN
46,000
46;000.
64921
OCEAN RESCUE FIRE ALARM RENEWAL
30,300
30,300
64923
PW WHS & SHOPS LED LIGHTS RETROFIT
74,000
74,000
65121
7 STREET GARAGE UPS BATTERY SYSTEM
66,600
66,'600.
65123
CONV.CTR. VIBRATION ISOLATORS
100,000
100,000
65218
PURDY AVE BOAT RAMP REPAIRS
464,694
-
464,694
%1, J� /�
1. V 1 I A V A I A
PROJECT PROGRAM
IMPROVEMENT. CITY MIBEACH
FY 2022-2026 CAPITAL PLAN BY PROGRAM
Previous Years FY 2022 FY 2023 FY 2024 FY 2025
ATTACHMENT B
FY 2026. Future Total
65219
SOUTH POINTE PARK HVAC REPLACEMENT
160,000
160,000
65220
MIAMI CITY. BALLET STUDIO FLOORING,
140,000
39,000
179,000
65223
CONVENTION CTR, EXHIBIT HALL LIGHTS
60,000.
60,000
65319
CODE / HOUSING OFFICES RELOCATION
588,475
588,475
65320
; UNIDAD INTERIOR & EXTERIOR PAINTING
90,000
90;000
65420
MBPD NORTH SUB STATION PARKING LOT
233,000
-
233,000
65520
MBPD N SUB STN PAINTING, FLOORING
234,000
234,000
65522
BASS MUSEUM 40 YEAR RECERTIFICATION
100,000
- - -
- - 100:000
65618
FLEET MANAGEMENT STAIRS RESTORATION
35,000
35,000
65718
FLEET MANAGEMENT WAREHOUSE CEILING
30,000
30,000
65720
HISTORIC CH-ROOF ACCESS LADDER
100,000
100,000
65818
FLEET MANAGEMENT FIRE SPRINKLER
250,000
250,000
65918
FLEET MANAGEMENT LED LIGHTING
75,000
75,000
65920
MBFD STATIONS SECURITY UPGRADES CW
126000
126,000
66018
FLEET MANAGEMENT CONCRETE SPALLING
100,000.
100,000
66020
CITY HALL-MAIN ENTRANCE PAVERS
550,000
550,000
66118
FLEET MANAGEMENT BAYS PAINTING
120,000
120,000
66120
LINCOLN RD STONE RESTORATION
368,000
368,000
66220
HISTORIC CITY HALL ELEVATOR
320,000
320,000
66618
SOUTH POINTE PK-FIRE ALARM RENEWAL
35,000
-77
35,000
66718
BEACH STORAGE AREA ENCLOSURE
170,000
170,000
6681.8
WATER STATION ROOF REPLACEMENT
30,000
30,000.
66918
ANCHOR GAR.-FIRE ALARM REPLACEMENT
221,000
221,000
67018
ANCHOR GARAGE-STAIRWELL DOORS
27,000
27,000
67030
MARINE PATROL EXTERIOR RESTORATION
60,728
60,728 .
67200
FIRE STATION 3 FIRE ALARM UPGRADE
55,000
55,000
67220
FIRE STATION 3 EMERGENCY GENERATOR
110,000.
110,000
67240
777 BUILDING HVAC 4TH FLOOR
162,121
162,121
67322
PARKING DECK CRACKS REPAIR
280,000
280,000
67360
BASS MUSEUM EMERGENCY GENERATOR
133,900..
1.33,900
67422
EAST CHILLED WATER PIPING INSULATION
35,000
35,000
67518
1755 MERIDIAN AVE OFFICE SECURITY
35,000
-
35,000
67522
CANAL PARK LANDSCAPING REPLACEMENT
-
40,000
40,000
ATTACHMENT B
PROJECT
PROGRAM
Previous Years
FY 2022
FY 2023.
FY 2024 FY 2025 FY 2026
Future total
67622
TERRAZZO FLOOR SCRUBBERS
40,000.
40,000
67722
ENERGY CONSUMPTION MANAGEMENT INTEG.
35,000
-
- -..
- 35000
67822
CHILLER LINES FLUSHING,
25,000
25,000
68122
FLEET 40 YEAR RE -CERTIFICATION
35,000.
. 35,000
68222
FLEET ENHANCEMENTS PHASE II UPGRADE
150,000
150,000
68322
FLEET SECURITY CAMERAS
1.57,000
157,000
68422
FLEET WAREHOUSE WATERPROOFING AND ROOF REPAIR
145,000
145,000
.68519
GO#48: POLICE HQ FACILITY
5,500,000
4,500,000
10,000,000
68522
FLEET GATE
51,000
51,000
68622
FLEET PARKING LOT RESURFACING
71;000
71,000
68720
POLICE HQ & PARKING GAR. FIRE ALARM
246,033
246,033
68760
CITY HALL ELECTRICAL UPGRADES
341,500
341,500
68820
BEACH RESTROOMS EXHAUST SYSTEMS
35,000
35,000
.69220
PUBLIC WORKS FACIUTY.GENERATOR
391,177
391,177
69470
FLEET/SANITATION FIRE ALARM SYSTEM
85,800
85,800
22,743,170•
3,719,000
11,962,000:
500,000 534,000
39,458,170
PARKS ADMINISTRATION
I
61121
SCOTT RAKOW YOUTH CENTER -KITCHEN
150,000
150,000
65322
MIAMI BEACH GOLF CLUB LAKE.AERATION
45,000
45,000
45,000,
150,000
195,000
PARKS AND RECREATION
60022
FLAMINGO PARK NORTH -SOUTH WALKWAY
300,000
300,000
60121
BEACHVIEW FITNESS COURSE REPLACEMENT
146,000
146,000
60122
SOUNDSCAPE PK LED'LIGHTING
75,000
75,000
60322
PARKS MAINT. FACILITY RENOVATIONS .
335,000
335,000
60523'-
FLAMINGO FOOTBALL STADIUM RAILINGS
100,000
100,000
61219
N. SHORE TENNIS FACILITY FENCE
47,000
47,000
61319
N. SHORE BANDSHELL PLUMBING REPAIRS
30,000
30,000
62718
N. BEACH PARKS RESTROOM RESTORATION
190,000
91,000
281,000
63080
. BEACH RESTROOMS PAINT AND CONCRETE
260,275
260,275
63318
NORMANDY ISLE PARK POOL RENOVATIONS
64,000
358,000..
422,000
66022-
SOUTH POINTE PARK SPLASH PAD
249,000
249,000 .
66418
FLAMINGO POOL DECK & PUMP ROOM
334,000
334,000
67040
NORMANDY ISLE PARK & POOL
200,000
200,000
EFY
PROJECT PROGRAM
CITY OF MIAMI BEACH
202NT 2 - 2026 CAPITAL IMPROVEMEPLAN BY PROGRAM
Previous Years FY 2022 FY. 2023. FY 2024 FY 2025.
ATTACHMENT B .
FY 2026. Future Total .
67120 SOUNDSCAPE PARK IMPROVEMENTS
28,000
. 28,000
67420 :FLAMINGO. PARK. POOL PLAYGROUND
245,584
245,584
68919 GO#52: LED LIGHTING IN PARKS
3,741,000.
759,000
4,500,000 .
4,805 8591
449,00W. 1
1,629,000i �
669,000 -!
i. 7 552 859;
POLICE CHIEF OFFICE
62423 SECURITY CAMERA BEACHWALK -MID BCH
890,000
890,000
1;780,000
. 62623 SECURITY CAMERA BEACHWALK • NORTH BCH
647;500
647;500 '
1;295,000.
64927 : NORTH BEACH'OCEANSIDE.PARK CCTV SEG..
156,000.
156,000
,537,500,
3,231,0001156,0001
[PW ENGINEERING
64122 BOLLARDS INSTALLATION AND REPL,
200,000,302,500;
y
502,500;
JPW GREENSPACE MANAGEMENT
' 60011 IRRIGATION SYSTEM MACARTHUR CAUSEWAY
'28,000
28,000
65120. GREENSPACE FACILITY SECURITY SYSTEM
T 10,000
110,000
66520 SOUTH BEACH ROW LANDSCAPE
280;000.
300,000
.100;000
680,000
280,0001-:
` i
438,0001� .
100,000. i j
.
818,0001r .i
;PW' STREETS
65021 BELLE ISLE PARK LIGHTING ENHANCEMENT
110,000.
110,000;
ETOURISM & CULTURAL DEPARTMENT
65022 CONVENTION CENTER RUBBER WALLS AND •
184,000
184,000
' ... 65023' 1 CONV.CTR. EXHIBIT HALLS FIRE STROBE
" : 300,000
"-
" : 300,000
65122 CONVENTION CENTER ADDITIONAL SECURITY CAMERA
250,000
250,000
. . ....
TOTALT
ISEAWALLS
.r !
27,939,0291.00
434,000'
300,0001
16,319,0001
2,806,5001 534,0001
734,000..
(CAPITAL IMPROVEMENT PROGRAM
27600:.. SEAWALL-BOTANICAL GARDEN
1,208,662 _
1,208,662
28790 CONVENTION CENTER DR TO WASHINGTON
11800,000 . -
1,800,000
3.008:6621' ',.
t 3,008,6621 -
(PW ADMINISTRATION
20220 :SEAWALL-DICKENS AVSHORELINE
435,394
435;394
28300 SHANE WATERSPORT SEAWALL
784,000.
784,000 -
29560 BRITTANY BAY PARK SEAWALL
1,109,000
1,109,000
2,328,394"
-i
-i:.; ..
2,328,394; . .
(PW ENGINEERING
MIAMI Ell 9. 1
PROJECT PROGRAM
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY PROGRAM
Previous Years FY 2022 FY 2023. FY 2024 FY 2025
ATTACHMENT B
FY 2026 Future Total
23618
LENOX COURT & JEFFERSON AVE SEAWALL
300,000
21118
300,000
27170
: SEAWALL-BISCAYNE BAY ST END PH. II
1,694,0581,6941058
225,000
21270
27919
GO#39: SEAWALLS & SHORELINES . "
5,000,000
.5,000,000.
10,000,000
28740
SEAWALL- HOLOCAUST MEMORIAL
100,000
100,000
28780
SEAWALL DADE BLVD -WASHINGTON AVE" "
1,625,000
16,219,308
1,625,000
28820
INDIAN BEACH PARK SEAWALL
715,000
CITY CENTER COMMERCIAL DISTRICT BPB
715,000
29020
CITYWIDE SEAWALL REHAB
10,000,000
5,000,000, 5,000,000,
20,000,000
29500
COLONS CANAL ENHANCEMENT PROJECT "
5,458,889
50,217,165 ..
- 5,458;869
: GO#31: OCEAN DRIVE CORRIDOR
2,000,000
24,892,947
5,000,000 10,000,000' .
39,892,947,
20597..
WEST AVENUE PHASE II
105,140,819
105,140,819
21118
STILLWATER ENTRANCE SIGN
_
.225,000.
225,000
21270
VENETIAN NEIGH. -ISLANDS
46,372,927
46,372,927
22050
BAYSHORE NEIGH. BID PACK A
25,085,154
25,085,154
23180
BAYSHORE NEIGH. BID PACK D
16,219,308
16,219,308
23270
CITY CENTER COMMERCIAL DISTRICT BPB
25,809,526
54,787,421 ,80,596,947
23380
PALM & HIBISCUS ISLAND ENHANCEMENT
50,217,165
50,217,165 ..
27319
: GO#31: OCEAN DRIVE CORRIDOR
2,000,000
18,000,000
20,000,000 .
27419
GO#32: PALM & HIBISCUS LANDSCAPING
1,000,000
1,000,000
28610:
RUE VENDOME PUBLIC PLAZA
2,511,705
2,511,705
28940
BAYSHORE NEIGH. CENTRAL- SOUTH
21,777,204
21,777,204
.29300
LINCOLN RD LENOX-COLLINS W/SIDE STR
40,000,000
40,000,000
29310.
CONVENTION CNTR LINCOLN RD. CONNECTOR
10,000,000
1,800,000
3,400,000 ..
15,200,000
29530
COLONS PARK ANCILLARY IMPROVEMENTS
4,000,000
4,000,000
.69790
SUNSET 3 & 4 UTILITY PAYMENT
1,532,002
1,532,002
359,979,252
1,800,000
21,625,000;
54,787,421 438,191,673
ECONOMIC DEVELOPMENT
j
65721
MXE LAND USE/MOBILITY/ECONOMIC DEVELOPMENT
STUDY.
190,000
(190,000)
ATTACHMENT B
CITY OF MIAMI BEACH
FY 2022- 2026 CAPITAL IMPROVEMENT PLAN BY PROGRAM
PROJECT PROGRAM
Previous Years
FY 2022 FY 2023
FY 2024 FY 2025
FY 2026 Future
Total
(ENVIRONMENT SUSTAINABILITY
20197 CITY CENTER RESWENCY.ENHANCEMENTS..
1;000,000
1,000,000
66420 DADE BOULEVARD PEDESTRIAN PATHWAY
225,000
225,000
68219 GO#33: STREET TREE MASTER PLAN
2,500,000
2;500,000
5,000,000.
3,725,000
2,500,000'
6,225,000
[FACILITIES & FLEET MANAGEMENT
29880 LINCOLN RD MALL ADA PEDESTRIAN
87,500
87,500
65921 71 ST STREET BUSINESS CORRIDOR LIGHT
69,000
69,000
69620 S. BOWL SIGNAGE/ PAINTING/ LIGHTING' '
150,000
150,000
306,500'
'306,5001
'PW ADMINISTRATION
20922 NORMANDY ISLES DRAINAGE IMPROVEMENT
292,000,000
292,000,000
24020 . ORCHARD PARK.
250,000
13,688,421
13,938,421
24120 TOWN CENTER
96,000,000
96,000,000
24619 GO#37: SIDEWALK IMPROVEMENTS
5,200,000
3,900,000
3,900,000
13,000,000
27360 RESTORATIVE TREEWELL-PH 4 -SOUTH BCH
690,000
690,000
27519, GO#34: ABOVE GROUND IMPROVEMENTS
23,000,000
20,000,000
43,000,000
27619 GO#35: FLAMINGO PARK NEIGHBORHOOD
20,000,000
20,000,000
27819 GO#38:STREET PAVEMENT
5,800,000
12,100,000
12,100,000
30,000,000
28050 EVERGLADESCOURT ALLEYWAY PAVING
300,000
300,000
28119 GO#41: LA GORCE NEIGHBORHOOD
14,000,000
14,000,000
28219 GO#44: NORTH SHORE NEIGHBORHOOD
8,000,000
8,000,000
28719 GO#53: SECURITY FOR PUBLIC SPACES
2,000,000
2,350,000
-
4,350,000
29810 ALLEYWAY RESTORATION PH III
532,500
100,000
632,500
61117 RESTORATIVE TREE WELL TREATMENT
292,000
292,000
15,064,500;
- 137,450,000,
292,000,000:
91,688,421
536,202,921,
[PW ENGINEERING
I
20078 CITYWIDE STREET PAVEMENT
15,000,000
15,000,000
20177 OCEAN DR. EXTENDED SIDEWALK PROJECT
164,650
164,650
20250 LAGORCE ISLAND -LIGHTING TREES MISC
66,376
.66,376
20422 FLAMINGO NEIGHBORHOOD
300,000
214,000,000
214,300,000
20522 NAUTILUS NEIGHBORHOOD'
29,486,421
29,486,421
20587 1ST STREET-ALTON RD TO WASHINGTON.
26,870,741
20,000,000"
46,870,741,
20607 1 1TH STREET -FLAMINGO NEIGHBORHOOD
7,602,460
7,602,460
AMIBE'H
PROJECT PROGRAM
CITY OF MIAMI BEACH
FY 2022.- 2026 CAPITAL IMPROVEMENT PLAN BY PROGRAM
Previous Years,. FY 2022 FY 2023. FY 2024 FY 2025
ATTACHMENT B
FY 2026 Future Total
23220 NORTH SHORE NEIGH. IMPROVEMENTS
7,339,266
60,127,421
67,466,689
23240 LA GORCE NEIGHBORHOOD IMPROVEMENTS
2,267,146
80,000,000
R2,267;1'41
23300 FLAMINGO NEIGHBOR HOODSOUTH
7,478,640.
. 7,478,640
23360 WEST AVE/BAY RD NEIGH.,
25,902,873,
25,902,873
29320 17TH STREET NORTH IMPROVEMENTS .
2,000,000
2,000000
60237 COLLINS / HARDING.ALLEY RESTORATION.
100,000
100,000
80,092,149
20,000,000.
- -
398,613,842'
498,705,991,
" IPW GREENSPACE MANAGEMENT
29760 RESTORATIVE TREEWELL-PH 3
683,911
683,911
61619 'NORTH BEACH ROW LANDSCAPING
270;000
300;000
100,000
670;000
62019 MIDDLE BEACH ROW LANDSCAPE
90,285
136,000.
300,000
150,000:
676,285
63521 RESTORATIVE TREE WELL CITYWIDE
480,000
240,000
720,000
64119 INDIAN CREEK LANDSCAPE & IRRIGATION
1,200,000
1,200,000-
2,244,196
136,000, .
1,080,000'
490,000~
3,950,196
- [PW STREETS
20000 PAVEMENT & SIDEWALK PROGRAM .
1,732,986
463,000
2,195,986
25650. CITYWIDE CURB RAMP INSTALLATION
112,560
1.12,560
26700 : ROW IMPROVEMENT PROJECT
1,844,084
1,844,084.
3,689,630
-
' 463,000
-
4,152,630
jTOURISM 8: CULTURAL DEPARTMENT
j
21019 SHORT-TERM 41 ST ST RECOMMENDATIONS
100,000
100,000
27719 GO#36: WASHINGTON AVE. CORRIDOR
1,000,000
9,000,000
10,000,000
28019 GO#40: 41 ST. CORRIDOR
1,500,000
13,500,000
15,000,000
.28630 BONITA DRIVE STREET END IMPROVEMENT,
135,000
135,000
2,735,000
-
22,500,000
25,235,000
jTRANSPORTATION
{
21319 ROYAL PALM AVE & 46TH STREET CIRCLE
107,000
(107,000)
27910 MERIDIAN AVE SHARED. USE PATH
278,000..
756,000
1,034,000
62222 WEST AVENUE BICYCLE LANES PHASE II
131,000
533,072
664,072
62322 ORCHARD PARK TRAFFIC CALMING
245,505
1,473,867
1,719,372
62617 72ND STREET PROTECTED BIKE LANE
519,000
519,000
904,000
1,025;505'
2,006,939. ` .
3,936,444
TOTAL:
f Y 1 IA! Y 1 t EAC -
PROJECT PROGRAM
STREET LIGHTING
CITY OF MIAMI BEACH'
FY 2022•- 2026 CAPITAL IMPROVEMENT PLAN BY PROGRAM
Previous Years FY 2022 FY 2023. FY 2024 FY 2025. •.
ATTACHMENT B
FY 2026 Future Total
LFACILITIES & FLEET MANAGEMENT
27070 BEACHWALK LIGHTING RETRO
665,625
665,625
.62940 CITYWIDE. PARKING LOT LIGHTING
450,000 ,•,
'.450,000
1,115,6251-
-i
1,115,625
[PW ADMINISTRATION
64918 SMART LIGHTING MASTER PLAN
2,463,895
.1,200,000
600,000
600,000
4,863,895
69019. GO#55: STREET LIGHTING IMPROVEMENTS
3,500,000
6,500,000 .
10,000,000
5,963,895' .
7,700,000 !.
600,000; '
600,000
- 14,863,895
JPW ENGINEERING
2,1218 5TH STREET FLYOVER LIGHTING .
148,779,
148,779,
jPW STREETS
27800 STREET LIGHTING IMPROVEMENTS
.. TOTAL:
996,305'
,
8,224,6041
- 7,700,0001
629,000 -
1,229,0001
.0000.
50,000,000, 51,625,305'
....... ... . .
rCAPITAL IMPROVEMENT PROGRAM
20327 2 WAY CONVERSION 42ND ST. SHERIDAN
510,000'
510,000
27940 EUCLID AVE. - FROM 17TH ST & 5TH' ST
470,000
470,000
980,000
980,000
FACILITIES & FLEET MANAGEMENT
20521 JULIA TUTTLE ENTRANCE SIGN
275,000.
275,000.
YRANSPORTATION
20018 ADAPTIVE TRAFFIC SIGNAL CONTROLS
1,800,000 1;800,000
.20118 BAYSHORE NEIGH. TRAFFIC CALMING I
378,075
378,075
20200 TRANSPORTATION CAPITAL INITIATIVE
42,492,028
42,492,028
20218 NAUTILUS TRAFFIC CALMING PHASE I
355,500
355,500
20221 16TH STREET PROTECTED BIKE LANES
. 90,000 . 560,000
.650,000
20318 VENETIAN ILLUMINATED CROSSWALKS
.180,000
180,000 .
20617 NEW BUS SHELTER DESIGNS
504,251
504,251
20620 LA GORCE / PINE TREE DR BIKE LANES
230,000 ..
1;570;000
1,800,000
20718 SIGNALIZATION ALTON RD AND 4TH ST
.580,000
580,000
20818 ROYAL PALM NEIGHBORHOOD GREENWAY
430,000
430,000
.21014 BICYCLE,LANES/SHARED USE PATH IMPROVEMENTS
130,000 .•
, 844,247
1,980,000 ....
2,954,247
---- -- - -21419- - MERIDIAN AVENUE PEDESTRIAN CROSSING
.410,000
410,000
21522 .ALTON ROAD SHARED USE PATH PHASE II
3,631,000 3;631,000
22518 ENHANCED CROSSWALKS
480,000
480,000
MI AM I EAC H .
PROJECT PROGRAM
CITY OF MIAMI BEACH
FY 2022- 2026 CAPITAL IMPROVEMENT PLAN BY PROGRAM
Previous Years FY 2022 FY. 2023. FY 2024 FY 2025
ATTACHMENT B
FY 2026. Future Total .
23020
ALTON RD & 16TH STREET INTERSECTION
540,000
20224 NORMANDY SHORES
29,147,027
29,147,027
540,000
27860
51 ST STREET NEIGHBORHOOD GREENWAY
50,000
4,550,621.
4,550,621
20424 BISCAYNE BEACH
50,000
28080
INTELLIGENT TRANSPORT SYSTEM
18,776,260
13,266,321
20624 CENTRAL BAYSHORE
7,963,400
18,776,260 "
60177
SOUTH BEACH PEDESTRIAN ZONES
950,000.
20824 PARKVIEW ISLAND
4,759,121
4,759,121
950,000
60222
NORTH BEACH GREENWAYS PHASE III.
150,000
1,170;220"
1,320,220
60257
BAY DRIVE NEIGHBORHOOD GREENWAY -
100,000
100,000 "
60327
10TH STREET NEIGHBORHOOD GREENWAY
-
190,000"
224,000
1,080,000
1,494,000
62517
MERIDIAN AVENUE BICYCLE LANES
250,000
250,000
62521
NORTH BEACH GREENWAYS- PHASE II
604,230
1,10,000
. 714,230 .
62717
73RD STREET PROTECTED BIKE LANES
239,000
239,000
64190
ENTRANCE SIGNS TO NORTH. BEACH
58,000
600,000
91;000
831,679...
1,580,679
65221
PINE TREE DRIVE AND 46TH STREET
603,603
603,603
65321
PRAIRIE AVENUE AND 44TH STREET/CHAS
84,420
520,000
604,420
65518
JEFFERSON AVE & 15TH ST BEACONS
74,200
74,200
66122
INDIAN CREEK DRIVE PROTECTED BIKE
131,000
131,000
66222
71ST STREET BRIDGE BIKE LANES
100,000
100,000
68419
GO#42`TRAFFIC CALMING
1,500,000
500,000
2,000,000
68619
GO#43: BIKE LANES & SHARED USE PATH
2,500,000.
2,500,000
5,000,000
69820
NORTH BEACH GREENWAYS PHASE I
448,625
448,625
72,718,192
1,971,000
4,869,247
4,651,899 1,980,000
5,431,000 91,621,338
(PW ADMINISTRATION
20124 ALLISON ISLAND NORTH
6,154,321
6,154,321
20224 NORMANDY SHORES
29,147,027
29,147,027
20323 LA GORCE ISLAND
9,104,921
9,104,921
20324 BELLE ISLE
4,550,621.
4,550,621
20424 BISCAYNE BEACH
20,445,421
20,445,421
20524 BISCAYNE POINT
13,266,321
13,266,321
20624 CENTRAL BAYSHORE
7,963,400
7,963,400
20724 INDIAN CREEK PARKWAY
9,217;121
9,217,121
20824 PARKVIEW ISLAND
4,759,121
4,759,121
ATTACHMENT B .
CITY OF MIAMI BEACH
E- FY' 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY PROGRAM I AM] b
PROJECT
PROGRAM
Previous Years
FY 2022
FY. 2023.
FY 2024
FY. 2025 FY 2026. Future
Total .
20924
STAR ISLAND
500,000
6,032,621
6,032,621
21122
SUNSET ISLAND 1
28;275,370
27370
5,319,421"
5,319,421
21222
SUNSET ISLAND 2
17,644,487
28120
WATER PUMP STATIONS IMPROVEMENTS
7,446,121
7,446,121
22320
LAKEVIEW NEIGHBORHOOD IMPROVEMENTS.
10,306,000
28220
WASTEWATER MANHOLE REHABILITATION
3,045,000
41,000,000
41,000,000
22418
MT. SINAI STORMWATER PUMP STATION
28320'
SEWER PUMP STATION ODOR CONTROL
850,600
- 19,727,421
19,727,421
60319
WATER METER REPLACEMENT PROGRAM
16,104,893 -
1,400,000
16,104,893
60419
DERM 8 EPA CONSENT DECREE
1,400,000
500,000.
2,800,000
2,800,000
2,800,000 2,800,000
13,100,000
65421
VALVE REPLACEMENT PROGRAM ' .
931,635
1,859;853
850,000
29820
2,791,488
2,000,000
18,436,528
2,359,853{
2,800,000'.
2,800,000
2,800,000, 2,800,000 184,133,858
216,130,239; .
(PW ENGINEERING
27,916,584:
33,956,916
- 206,571,900.
gTRANSPORTATION
20527
FDOT UTILITIES RELOCATION.
1,077,529
1,500,000
FIBER COMMUNICATIONS INSTALLATION
17,000,000
19,577,529
20619
WASTE WATER STATIONS REHABILITATION
11,103,400
2,870,733
21339,267
70,188,737
383,111,370 ..
16,313,400
20719
SCADA AND PLC SYSTEMS
7,238,000
7;238,000
21220
' INDIAN CREEK STREET DRAINAGE IMP
22306 926
22 308 926
21720
' • DRAINAGE SYSTEM WATER QUALITY PILOT
500,000
500,000
23000
SUNSET HARBOUR PUMPSTATION UPGRADES
28,275;370
28;275,370
27370
541N DIAMETER REDUNDANT SEWER FORCE
17,644,487
17,644,487
28120
WATER PUMP STATIONS IMPROVEMENTS
5,595,000
2,595,937
2;115,063
10,306,000
28220
WASTEWATER MANHOLE REHABILITATION
3,045,000
1,592,000
1,639,091
1,688,263
7,964;354
28320'
SEWER PUMP STATION ODOR CONTROL
850,600
850,600
28420
SWR PUMP STATION # 18 IMPROVEMENTS '
1,400,000
1,400,000
28520
WATER&WASTEWATER MAINS AND REHAB
26,417;709
7,833,710
21;823;162
15,268,653
71,343,234
28920
BIOSWALE PILOT PROJECT
850,000
850,000
29820
STORM WATER OUTFALLS
2,000,000
2;000,000'
128,306,021
16,392,379
27,916,584:
33,956,916
- 206,571,900.
gTRANSPORTATION
22018
FIBER COMMUNICATIONS INSTALLATION
292,000
292,000:.
TOTAL
GRANDTOTAL:
1,693,228,914
70,188,737
383,111,370 ..
62,470,985. .310,332,100
15,362,000 792,053,542 3,326,747,648
MIAMI BEACH
Resolutions - R7 F
COMMISSION MEMORANDUM
TO: Honorable Mayor and Members of the City Commission
FROM: Alina T. Hudak, City Manager
DATE: September 17, 2021
5:03 p.m. First Reading Public Hearing
SUBJECT.A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY
OF MIAMI BEACH, FLORIDA, ADOPTING THE TENTATIVE CAPITAL
IMPROVEMENT PLAN FOR FISCAL YEARS (FY) 2022 - 2026' AND
ADOPTING THE CITY OF MIAMI BEACH TENTATIVE CAPITAL BUDGET
FOR FISCAL YEAR 2022, SUBJECT TO A SECOND PUBLIC HEARING
SCHEDULED ON THURSDAY, SEPTEMBER 30, 2021 AT 5:03 P.M.
RECOMMENDATION
See attached Memorandum.
SUPPORTING SURVEY DATA
N/A
Applicable Area
Citywide
Is this a "Residents Right Does this item utilize G.O.
to Know" item, pursuant to Bond Funds?
City Code Section 2-14?
Yes No
Strategic Connection
Organizational Innovation - Ensure strong fiscal stewardship.
Legislative Tracking
Office of Management and Budget
ATTACHMENTS:
Description
❑ Memo - FY 2022 Capital Budget
Page 1044 of 1657
AMI B EAC H
City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov
COMMISSION MEMORANDUM
To: Honorable Mayor Dan Gelber and Members of the City Commission
FROM: Alina T. Hudak, City Manager
DATE: September 17, 2021
SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI
BEACH, FLORIDA, ADOPTING THE TENTATIVE CAPITAL IMPROVEMENT PLAN
FOR FISCAL YEARS (FY) 2022 - 2026 AND ADOPTING THE CITY OF MIAMI BEACH
TENTATIVE CAPITAL BUDGET FOR FISCAL YEAR 2022, SUBJECT TO A SECOND
PUBLIC HEARING SCHEDULED ON THURSDAY, SEPTEMBER 30, 2021 AT 5:03
P.M.
STRATEGIC PLAN SUPPORTED
Organizational Innovation — Ensure strong fiscal stewardship
ADMINISTRATION RECOMMENDATION
Adopt the Resolution adopting the Tentative Capital Improvement Plan (CIP) for FY 2022 — 2026
and adopting the Tentative Capital Budget for FY 2022.
BACKGROUND
The City's annual Capital Budget contains capital project commitments appropriated for Fiscal
Year 2022. Preparation of the Capital Budget occurred simultaneously with the development of
the FY 2022 — 2026 Capital Improvement Plan (CIP) and FY 2022 Operating Budget. The Capital
Budget represents the project budgets for both current and new capital projects necessary to
improve, enhance, and maintain public facilities and infrastructure to meet the service demands
of residents and visitors to the City of Miami Beach. Capital reserves, debt service payments, and
capital purchases found in the Operating Budget are not included in this budget. The Capital
Budget for FY 2022 appropriates funding for projects that will require commitment of funds during
the fiscal year.
The Capital Improvement Pian is a financing and construction/acquisition plan for projects that
require significant capital investment. The CIP, which is updated annually and submitted to the
City Commission for adoption, specifies and describes the City's capital project schedules and
priorities for the five years immediately following the Commission's adoption. In addition, the first
year of the plan outlines the funding to be appropriated in the annual Capital Budget.
This document is an official statement of public policy regarding long-range physical development
in the City of Miami Beach. The FY 2022 — 2026 CIP of the City of Miami Beach is a five-year
plan of public improvements and capital expenditures adopted by the City. A capital improvement
is defined as a capital or "in-kind" expenditure of $25,000 or more, resulting in the acquisition,
improvement, or addition to fixed assets in the form of land, buildings, or improvements more -or -
less permanent in character and durable equipment with a life expectancy of at least five years.
Page 1045 of 1657
FY 2022 Tentative Capital Budget and FY 2022 — 2026 CIP
September 17, 2021
Page 2 of 24
The FY 2022 — 2026 CIP for the City of Miami Beach is a five-year plan of public improvements
and capital expenditures, proposed to be adopted by the City totaling $841.1 million, of which
$69.8 million is proposed to be appropriated in FY 2022. The total for projects included in the CIP,
comprising $1.7 billion in appropriations for ongoing projects through FY 2021 and $792.0 million
in unfunded/programmed needs beyond FY 2026, is $3.3 billion.
Projects will address many needs across different areas of the City including: neighborhood
enhancements such as landscaping and sidewalk restoration; traffic calming; roadway and bridge
resurfacing and reconstruction; water, sewer, and drainage system improvements; park
construction, renovations, and upgrades; renovation of seawalls; parking lot and garage
renovations; and construction/renovations of public facilities. A detailed listing of all capital
projects is provided in the Proposed FY 2022— 2026 Capital Improvement Plan & FY 2022 Capital
Budget document. The Capital Budget for FY 2022 will be appropriated on October 1, 2021.
FINANCIAL IMPACT OF COVID-19
On March 1, 2020 the Governor issued an Executive Order directing the Surgeon General of the
State of Florida to issue a public health emergency and in response to the pandemic outbreak of
COVID-19, the Governor declared a State of Emergency on March 9, 2020. In direct response to
the first confirmed case of COVID-19 in Miami -Dade County on March 11, 2020 the Miami -Dade
County Mayor declared a State of Emergency for Miami -Dade County. The City Manager declared
a State of Emergency in the City of Miami Beach on March 12, 2020. Subsequently, both the
County and the City issued various Emergency Orders temporarily closing public and private
facilities, including the temporary closure of all non-essential retail and commercial
establishments, and identifying essential retail and commercial businesses which may remain
open. These actions have greatly limited the amount of economic activity taking place in the City
of Miami Beach and continue to result in significant impacts to the City's finances.
At the April 17, 2020 FERC meeting, in response to the projected revenue losses through the end
of the fiscal year, the Administration presented the City's budget -balancing plan. These plans
emphasized cost reductions as much as possible, including a reduction in capital expenditures,
and judiciously using reserves to make up the difference.
As a result of the impact of COVID-19 on the City's finances, several capital projects were
deferred in the FY 2021 Capital Budget. COVID-19 has also disrupted global supply chains,
resulting in a spike in prices that are dramatically impacting the City's capital project costs. In
addition, various cost impacts from scope changes, normal cost inflation, permitting delays, and
competition with private sector construction are impacting the cost of the several of the City's
capital projects. The resulting funding gaps related to these projects are detailed further.
OVERVIEW OF THE FY 2022 — FY 2026 FIVE-YEAR CAPITAL IMPROVEMENT PLAN
The FY 2022 — FY 2026 CIP for the City of Miami Beach is a five-year plan of public improvements
and capital expenditures proposed by the City. This document is an official statement of public
policy regarding long-range physical development in the City of Miami Beach. The CIP has been
updated to include projects that will be active during FY 2022 through FY 2026.
The CIP has also been updated to include additional funding sources that have become available,
changes in project timing, and other adjustments to ongoing projects as they have become better
defined, including projects that have been reconfigured, re -titled, combined with or separated from
Page 1046 of 1657
FY 2022 Tentative Capital Budget and FY 2022 — 2026 C/P
September 17, 2021
Page 3 of 24
other projects and/or project groupings. These adjustments have no fiscal or cash impact and are
as a result of a comprehensive review of the program to ensure that our plan accurately reflects
all project budgets, funding sources, and commitments.
The CIP also contains information on appropriations prior to FY 2022 for ongoing/active projects,
as well as potential future appropriations beyond FY 2026. In conjunction with the development
of the FY 2022 Capital Budget and FY 2022 — FY 2026 CIP, the City began to develop a list of
potential projects that may be funded in the future, including projects that have been approved as
part of a plan, but not yet sequenced or approved for funding.
The following table shows a summary of the Five -Year CIP by program area, as well as prior year
funding for ongoing projects and funding requirements for desired projects with no anticipated
funding for the FY 2022 Capital Budget and the FY 2022 — FY 2026 CIP, and beyond.
1: F � `� --' i •�.. .:_ "i ,j-� �' j`ai x'mi }' �r �r,. t 3- �_��fi .. tc i`� a-_ ..-.� '�'`'� i
i
z�gv
r
ART IN PUBLIC PLACES
7,936,131
85,000
-
-
- -
-
8,021,131+
BRIDGES
10,376,204
750,000
750,000
800,000
- -
-
12,878,204
COMMUINITY CENTER
2,500,000
-
-
-
- -
-
2,500.000.
CONVENTION CENTER
629,567,548
-
-
-
- -
-
629,567,548
ENVIRONMENTAL
4,854,000
156,000
7,450,000
310,000
- -
-
12,770,000
EQUIPMENT
40,796,453
7,989,000
9,373,000
6,806,000
4,938,000 -
-
69,902,453
GENERAL PUBLIC BUILDINGS
13,972,323
971,000
23,809,000
-
200,000 -
5,290,000
44,242,323
GOLF COURSES
11,039,099
793,000
254,000
238,000
- -
6,000000
18,324,099
MONUMENTS
701,245
-
820,000
-
- -
-
1,621,245
PARKING
250,000
-
-
-
- -
-
250.000
PARKING GARAGES
63,857,149
3,471,000
3,789,100
1,785,000
2,325,000 500,000
-
75,727,249
PARKING LOTS
4,890,142
150,000
150,000
150,000
150,000 -
-
5,490,142
PARKS
145,364,016
1,406,000
79,211,500
6,447,670
4,805,100 1,524,000
1,540,000
241,298,286
RENEWAL 8 REPLACEMENT
27,939,029
5,573,000
16,319,000
2,806,500
534,000 5,107,000
-
58,278,529
SEAWALLS
30,230,003
5,000,000
10,000,000
-
- -
-
45,230,003
STREETS / SIDEWALKS I STREETS(
468,930,227
22,771,505
187,624,939
490,000
292,00D,000 -
545,089,684
1,5f6,906,366
STREET LIGHTING
8,224,604
-
7,700,000
1,229,000
600,000 -
50,000,000
67,763,604
TRANSIT/TRANSPORTATION
73,698,192
1,971,000
5,144,247
4,651,899
1,980,000 5,431,000
-
82,676,338
UTILITIES
147102,549
18,752,232
30,716,584
36,756,916
2,800000 2.800,ODO
184,133,858
423062139
The graph which follows shows the major project types with funding proposed and programmed
in the FY 2022 — FY 2026 CIP. The largest proposed and programmed investments are in the
street/sidewalks/streetscapes (60%), parks (11 %), and utilities (11 %).
Page 1047 of 1657
FY 2022 Tentative Capital Budget and FY 2022 — 2026 CIP
September 17, 2021
Page 4 of 24
FY 2022 - FY 2026
CAPITAL IMPROVEMENT PLAN: $841.1 MILLION
. STREETS / SIDEWALKS / STREETSCAPES
. PARKS
UTILITIES
. RENEWAL & REPLACEMENT
- EQUIPMENT
• GENERAL PUBLIC BUILDINGS
• TRANSIT / TRANSPORTATION
. SEAWALLS
• PARKING GARAGES
• STREET LIGHTING
. ENVIRONMENTAL
• BRIDGES
GOLF COURSES
MONUMENTS
PARKING LOTS
• ART IN PUBLIC PLACES
OVERVIEW OF THE FY 2022 CAPITAL BUDGET (ONE-YEAR CAPITAL BUDGET)
At the first budget briefing on June 18, 2021, staff presented the preliminary list of unfunded
projects, which were being requested, including projects that the Administration proposed for
funding subject to the availability of funds. A summary of projects recommended for funding in
the FY 2022 Capital Budget, based on direction given by the Finance and Economic Resiliency
Committee on June 18, 2021, July 16, 2021, and July 23, 2021, is presented below (sorted by
funding source):
Capital Renewal and Replacement Fund (CRR) (Fund 125)
The proposed dedicated millage of 0.0235 mills is estimated to generate $815,000 for the General
Fund Capital Renewal and Replacement Fund based on a 0.3 percent increase in property
values. This reflects a $8,000 increase in CRR dollars available for capital projects over last year.
The proposed General Fund Renewal and Replacement projects for FY 2022 are listed below in
priority order and are recommended by Staff for funding due to their Priority 1 (Critical to
Continued Operations) needs. The remaining project requests are lower priority or are beyond
the funding capacity at this time:
• MBPD North Sub Station Parking Lot - $233,000
• 1755 Meridian Fresh Air Intakes (HVAC) - $63,000
• 1755 Meridian Roof Replacement (Elevator Room and Shaft) - $82,000
• MBPD Garage Exit Signs and Safety Lights - $31,000
• MBPD Main Roof Repairs - $136,000
• North Shore Youth Center Rooftop A/C Renewal - $120,000
• Scott Rakow Youth Center Lighting Renewal - $115,000
Page 1048 of 1657
FY 2022 Tentative Capital Budget and FY 2022 — 2026 CIP
September 17, 2029
Page 5 of 24
North Beach Quality of Life (Fund 307)
• Shane Rowing Center HVAC Units Replacements - $61,000
• North Shore Bandshell Rear Canopy - $310,000
• Normandy Isle Park Pool Renovations - $358,000
• Entrance Signs to North Beach (split -funded) - $244,000
• North Beach Oceanside Park Beachwalk CCTV Segment - $156,000
Mid Beach Quality of Life (Fund 306)
• Bayshore Park (Par 3) - $400,000
• MB Golf Club Driving Range Netting - $114,000
• Non -Motorized Vessel Kayak Launch - $70,000
• Middle Beach Row Landscape (split -funded) - $100,000
• MB Golf Club Kitchen Floor Replacement - $43,000
• MB Golf Club Reel Grinders Replacement - $71,000
• Miami Beach Golf Club Lake Aeration - $45,000
• Waterway Markers & Signs (split -funded) - $132,000
South Beach Quality of Life (Fund 305)
• Colony Theater Elevator - $87,000
• Bass Museum 40 -Year Recertification - $100,000
• 10th Street Auditorium -Louvers - $52,000
• Miami City Ballet Studio Flooring - $39,000
• Flamingo Park Tennis Center Courts (Split -funded) - $130,000
• MXE Land Use/Mobility/Economic Development Study - $(190,000) — defunded as this
will be funded within the existing GOB projects
• South Pointe Park -Fishing Pier Railing Repairs - $198,000
• Waterway Markers & Signs (split -funded) - $263,000
• Miami Design Preservation League (MDPL) Museum Master Plan - $175,000
Pay -As -You -Go (PAYGO) (Fund 302)
PAYGO funds help ensure adequate on-going reinvestment in the City's capital plant and
equipment. This funding can be used for any general government purpose and is the most flexible
funding source in the Capital Budget. The PAYGO fund has been historically funded by the
General Fund at $2.4 million annually. Funding levels have been as high as $7.5 million in the
past.
During the development of the FY 2019 budget, the Commission approved a dedicated millage
rate for PAYGO funding. This dedicated millage will allow for the growth of this fund over time, as
property values increase. Last year, the millage rate of 0.0755 was estimated to generate
$2,592,000. Based on the July 1st certified property values, the estimated FY 2022 revenue is
$2,616,000. This reflects a $24,000 increase in PAYGO dollars available for capital projects over
last year.
In addition to the revenues generated by the dedicated millage for PAYGO projects, at its July 16,
2021 meeting, the FERC recommended transferring an additional $900,000 from the General
Fund Reserve to the PAYGO fund to cover the cost of the Commission Chambers Renovation
project. This project will address ADA compliance issues; enhance lighting, acoustics, and
Page 1049 of 1657
FY 2022 Tentative Capital Budget and FY 2022 — 2026 C/P
September 17, 2021
Page 6 of 24
audio/visual technology; and convert the ground floor conference room in City Hall into a multi-
purpose press room.
The projects for FY 2022 are listed below.
• Collins Park Performing Arts Venue - $400,000
• Citywide Bridges - $750,000 ($600,000 which was previously programmed, but not
appropriated, for the Indian Creek Pedestrian Bridge project was rolled into this project)
• North Beach Oceanside Park (split -funded) - $(283,000) - funding swap (no change to
budget total)
• North Shore Park Youth Center Exterior Cafe and Restrooms - $400,000
• Middle Beach Row Landscape (split -funded) - $36,000
• 1755 Roof Replacement - $223,000
• Smart Building Automation System - $100,000
• Bollards Installation and Replacement - $200,000
• Entrance Signs to North Beach (split -funded) - $356,000
• City Hall Chamber & Press Room Renovation - $900,000
• Greenspace Facility Renovation - $200,000
• Shane Rowing Center Roof Replacement - $61,000
• Flamingo Park Baseball Stadium Stand - $65,000
• Miami Beach Mooring Field - $156,000
• Tobias Rehberger Obstinate Lighthouse Conservation - $85,000
Transportation (Fund 106)
• Indian Creek Drive Protected Bike Lanes - $131,000
• La Gorce / Pine Tree Dr Bike Lanes - $230,000
• 10th Street Neighborhood Greenway - $190,000
• 16th Street Protected Bike Lanes - $90,000
• Orchard Park Traffic Calming (split -funded) - $138,000
• West Avenue Bicycle Lanes Phase II (split -funded) - $108,000
Resiliency (Fund 112)
• Convention Center Lincoln Road Connector - $1,800,000
• Citywide Seawall Rehab - $5,000,000
• 1st Street -Alton Rd to Washington (split -funded) - $19,224,594
7th Street Garage (Fund 142)
• 7th Street Garage -Fire Sprinkler & Pump - $300,000
• 7th Street Garage -Entrance Flood Control - $278,000
• 7th Street Garage-Office/Restroom - $36,000
Transportation Concurrency Mitigation (Fund 158)
• Meridian Ave (North) 28th St & Dade - $756,000
• Orchard Park Traffic Calming (split -funded) - $76,000
• West Avenue Bicycle Lanes Phase 11 (split -funded) - $23,000
• Prairie Avenue & 44th Street/Chase Avenue - $520,000
• North Beach Greenways- Phase 11 - $110,000
• 71st Street Bridge Bike Lanes (formerly known as Painting & Lighting of Bridge) -
$100,000
Page 1050 of 1657
FY 2022 Tentative Capital Budget and FY 2022 — 2026 C!P
September 17, 2021
Page 7 of 24
Parks Concurrency Mitigation (Fund 158)
• Flamingo Park Tennis Center Courts (split -funded) - $30,000
• Citywide Parks Irrigation System - $156,000
• Citywide Parks Court Repairs - $105,000
• Normandy Shores Golf Club Tee Renovation - $125,000
• Citywide Fitness Course Replacement - $100,000
• Normandy Shores Golf Carpet Replacement - $40,000
• North Beach Parks Restroom Restoration - $91,000
• Citywide Parks Landscaping Improvement - $152,000
People's Transportation Plan (Fund 187)
• Orchard Park Traffic Calming (split -funded) - $31,505
• Royal Palm Ave & 46th Street Circle - $(107,000) — defunded as project will be combined
with the Orchard Park Traffic Calming project which has multiple funding sources
Capital Projects not Financed by Bonds (Fund 301)
• North Beach Oceanside Park - $283,000 - funding swap (no change'to budget total)
Gulf Breeze Loan (Fund 369)
• Shane Rowing Center Dock Ramp and Landing Platform - $413,000
The Gulf Breeze Bond (Loan) Fund (Fund 369) was funded by loan proceeds from the City of Gulf
Breeze and payment of the Allison Island special assessment. All loan proceeds were expended,
and the remaining balance is special assessment receipts. In order to utilize the remaining funds
within Fund 369, which are not currently designated for any specific use, it is recommended that
the Mayor and City Commission approve the use of all remaining and future funds in Fund 369
for the repairs of and improvements to City -owned facilities.
South Pointe Post RDA CDT (Fund 388)
• 1st Street -Alton Rd to Washington (split -funded) - $70,931
South Pointe Capital (Fund 389)
• 1st Street -Alton Rd to Washington (split -funded) - $704,475
Water & Sewer Operating & Capital (Fund 418)
• FDOT Utilities Relocation (split -funded) - $285,000
• Waste Water Stations Rehabilitation - $2,870,733
• Water Pump Stations Improvements - $2,595,937
• Waste Water Manhole Rehabilitation - $1,592,000
• Water & Waste Water Mains and Rehab - $7,833,710
• DERM & EPA Consent Decree - $500,000
• Valve Replacement Program (split -funded) - $1,029,000
Water & Sewer Bonds (Fund 419)
• Valve Replacement Program (split -funded) - $830,853
Water & Sewer Impact Fees (Fund 422)
• FDOT Utilities Relocation (split -funded) - $1,215,000
Page 1051 of 1657
FY 2022 Tentative Capital Budget and FY 2022 - 2026 CIP
September 17, 2021
Page 8 of 24
Convention Center Renewal & Replacement (Fund 443)
• Convention Center Rubber Walls and Parking Deck Repairs - $184,000
• Convention Center Additional Security Cameras - $250,000
• Parking Deck Cracks Repair - $280,000
• East Chilled Water Piping Insulation Repairs - $35,000
• Canal Park Landscaping Replacement - $40,000
• Terrazzo Floor Scrubbers - $40,000
• Energy Consumption Management Integration System - $35,000
• Chiller Lines Flushing (Fillmore, City Hall & 1755 Meridian) - $25,000
RDA Anchor Garage (Fund 463)
• 16th Street Garage -Roof Top Renewal - $34,000
• 16th Street Garage HVAC Renewal - $34,000
• 16th Street Garage-Office/Restroom - $30,000
• 16th Street Garage -Exterior Paint Renewal Paint and Waterproofing - $550,000
• 16th Street Garage -Joint Replacement - $200,000
RDA Penn Garage (Fund 467)
• Penn Garage -HVAC Renewal - $85,000
• Penn Garage -Traffic Coating -Retail - $100,000
• Penn Garage -Elevator Renewal - $218,000
Parking Bond (Fund 486)
• 13th Street Garage Neon Renewal - $67,000
Parking Operating & Capital (Fund 490)
• 42nd Street Garage -Stairwell Waterproofing - $50,000
• Sunset Harbour Garage Sealing - $75,000
• 13th Street Garage -Stairwell Railing - $50,000
• 42nd Street Garage -Stairwell Railing - $25,000
• 13th Street Garage -Parking Sign Renewal - $30,000
• Sunset Harbour Garage Screening - $200,000
• 17th Street Garage -Storage Space Renovation - $100,000
• 12th Street Garage -Plumbing System Update- $79,000
• 12th Street Garage- Interior Floor Drainage - $25,000
• 1755 Meridian Garage Floor Drainage - $200,000
• 17th Street Garage Interior Floor Drainage - $30,000
• 17th Street Garage -Electrical Feeder - $225,000
• Citywide Parking Lots Improvements - $150,000
• 1755 Meridian Garage LED Lighting - $150,000
• Sunset Harbour Garage LED Lighting - $300,000
• Skidata Garage Software Upgrade with Redundancy Server - $475,000
Fleet Management (Fund 510)
• FY 2022 Vehicle/Equipment Replacement - $7,414,000
• Fleet Management Facility 40 Year Re -Certification - $35,000
• Fleet Management Facility Enhancements Phase II Upgrade - $150,000
• Fleet Management Facility Security Cameras - $157,000
Page 1052 of 1657
FY 2022 Tentative Capital Budget and FY 2022 — 2026 C/P
September 17, 2021
Page 9 of 24
• Fleet Management Warehouse Waterproofing and Roof Repairs - $145,000
• Fleet Management Facility Gate - $51,000
• Fleet Management Facility Parking Lot Resurfacing - $71,000
The Capital Budget for FY 2022 totals $69,838,737 and will be appropriated on October 1, 2021,
when approved by the City Commission. Projects will address many needs in different areas of
the City including: neighborhood enhancements such as landscaping and sidewalk restoration;
traffic calming; roadway and bridge resurfacing and reconstruction; water, sewer, and drainage
system improvements; park construction, renovations and upgrades; renovations of seawalls;
parking lot and garage renovations, construction/renovations of public facilities; and vehicle
replacement. The following tables summarize the capital expenditures by funding and program
source.
FUNDING SOURCE
FY 2022
Res ienry
26,024,594
Water & Sewer CapitaProjects
16,706,379
Feet Management
8,023,000
Pay -As -You -Go
3,649,000
Concurrency Mitigation
2,384,000
Parking Capital Not Bons
2,164,000
Water & Sewer Impact Fees
1,215,000
Resort Tax 1 %- North Beach Quality of Life
1,129,000
Resort Tax I% -Mid BeacT Quality of Life
975,000
Convention Center R2newal & Replacement
889,000
Transportation
887,000
Resort Tax 1 % - South Beach Quality of Lie
854,000
RDA Garage (Anchor'
848,000
Water & Sewer Bon s 2017
830,853
Capital Renewal & Replacement
780,000
South Pointe Capital
704,475
7th Street Garage
614,000
Gulf Breeze Loan
413,000
RDA Garage (Penn)
403,000
Caital Not Bonds
Sout Pointe Post RDA CT
Parking Bonds 2010
HoIT Cent Transit Surtax
283,000
70,931
67,000
(75,495)
Total Approprkd6om as of 10/1/2021
S 69,838,737
PROGRAM
FY 2022
Streets/Sidewalks/Streetscapes
22, 771,505
Utilities
18,752,232
Equipment
7,989,000
Renewal & Replacement
5,573,000
Seawalls
5,000,000
Parking Garages
3,471,000
Tran sit/Transportation
1,971,000
Parks
1,406,000
General Public Buildings
971,000
Golf Courses
793,000
Bridges
750,000
Environmental
156,000
Parking Lots
150,000
Art In Public Places
85,000
Total Appropriations as of 10/ 1 /2021
$ 69,838,737
The FY 2022-2026 Capital Improvement Plan by Funding Summary sorts the projects in the FY
2022-2026 CIP and FY 2022 Capital Budget by funding source (revenue). As seen in the following
graph, the Resiliency fund brings in the largest portion (37%) of revenue for FY 2022 capital
projects, followed by Water and Sewer funds for capital projects at 24%.
Page 1053 of 1657
FY 2022 Tentative Capital Budget and FY 2022 — 2026 C/P
September 17, 2021
Page 10 of 24
FY 2022 SOURCES OF FUNDS: $69.8 MILLION
- Wc:ei 3 S�.v�• C.:uinl=•ajes5 .
f eye Mamrte i?•.t
i:crv_.rrP.ay M r � [n
Not :t dr
• VY.:'er & tieW L 13 Fre]
• (:an•,zr:hr.. <.=r.-rr r^.r-:awa A Re accrrrm
.ReS::,-_ux•"s.jcoh5:a;ici;'.oli)•;yl'i> .
:; A x•.JC r.4 n.hnrj
Cnpi,n: Rcm.1 A P,aclro::r:.:.nr
• Su_:n �o;Ne Cup;�:.l
G.. I' i reere Inn. j
:.ufra Nr, c vJ;
•Corr rn•,niy =+zlnpnendkea?,u Tax -Ali V,
. Ra'Xi y Bk J5 Zola
The FY 2022-2026 Capital Improvement Plan by Program sorts the projects in the FY 2022-2026
CIP and FY 2022 Capital Budget by Program (expenditure). The largest investments in FY 2022
are in streets/sidewalks/streetscapes (33%), followed by utilities at 27%.
FY 2022 CAPITAL BUDGET: $69.8 MILLION
8%
Capital Project Gags
s Streets/Sidewalks/Streetscapes
• Utilities
Equipment
. Renewal & Replacement
Seawalls
Parking Garages
- Transit/Transportation
. Parks
- General Public Buildings
- Golf Courses
. Bridges
. Enviromnentul
- Parking Lots
• Art In Public Places
At the June 18, 2021 FERC Budget Briefing, several key capital projects with existing funding
gaps were discussed. The outcomes of discussions regarding the projects are detailed below.
North Beach Oceanside Park
The funding gap of $1.9 million was addressed in the FY 2021 Capital Budget through the sixth
Capital Budget Amendment at the July 28th City Commission meeting.
Page 1054 of 1657
FY 2022 Tentative Capital Budget and FY 2022 — 2026 CIP
September 17, 2021
Page 11 of 24
Maurice Gibb Park
The funding gap of $1.2 million was addressed in the FY 2021 Capital Budget through the sixth
Capital Budget Amendment at the July 28th City Commission meeting.
Bayshore Park (Par 3)
The funding gap of $1.9 million was partially addressed in the FY 2021 Capital Budget through
the sixth Capital Budget Amendment at the July 28th City Commission meeting. The remaining
gap of $400,000 is proposed to be addressed through the FY 2022 Capital Budget process from
Quality of Life — Mid Beach funds.
First Street
The funding gap of $20 million is proposed to be addressed through the FY 2022 Capital Budget
process and funded primarily from the Resiliency Fund.
Fire Station #1
The construction contract for this project is not due to be awarded until October 2022. The
Administration's recommendation is to update the estimated shortfall of $6 to $10 million next
Summer, which may be less if COVID-19 cost pressures unwind over the next year. The updated
gap amount would likely need to be funded from the sale of vacant parcels identified by Property
Management and CBRE's asset inventory study.
Police Headquarters Renovation
The construction contract for this project is due to be awarded in October 2021. However, this
project is phased over time as funding is split between Tranche 1 and Tranche 2. The
Administration's recommendation is to review the scope for potential changes and use existing
Tranche 1 funding to complete the short-term elements of the project and potentially supplement
Tranche 2 funds in future years if needed.
72nd Street Complex
This project was discussed at the June 18, 2021, July 16, 2021, and July 23, 2021 FERC Budget
Briefing. It was also discussed at the July 30, 2021 regular FERC meeting. The preliminary
estimated funding shortfall range for this project has been $24.6 to $49.1 million. Since then, the
CIP department completed negotiations with Haskell, the selected bidder. The final negotiated
design/build contract GMP is $85 million. This amount assumes the current scope in the Design
Criteria Package. The all -in cost for the project is $107 million. The current budget appropriation
for the project is $64.4 million. The difference is a funding gap of $42.6 million. This amount can
be reduced through the application of the $1 million dedicated allocation to this project from the
Ocean Terrace Settlement and saving $4.5 million by reducing the 10% contingency to 5%. The
difference is the net gap of $37.1 million.
One of the strategies for closing the funding gap is to determine the amount for the parking portion
of the project (500 spaces) and use parking bonds to close the gap between the total parking cost
and the $10.6 million of parking funds already budgeted in the project. Of the $85 million
design/build contract, approximately $30 million of it is parking related. Netting out the $10.6
million, there is potential to issue parking bonds for $19.4 million, which would reduce the funding
gap to $17.7 million.
In order to move forward, the City Commission has at least 3 options. Option 1 is to continue to
pursue an agreement with Haskell, the selected bidder, and identify funding options to close the
remaining $17.7 million gap. Option 2 is to enter into negotiation with the second proposer to
Page 1055 of 1657
FY 2022 Tentative Capital Budget and FY 2022 — 2026 CIP
September 17, 2021
Page 12 of 24
develop a design/build contract GMP. Option 3 would be to change the scope in the Design
Criteria Package in order to reduce costs to help close the funding gap. Depending on the degree
of changes to the scope, it may require a new procurement process.
At the July 30th FERC meeting, the Committee approved the Administration's recommendation
to proceed with Option 1 including issuance of parking bonds of approximately $19.4 million and
identifying the $17.7 million of remaining funds needed to close the funding gap in the project
before awarding any contracts related to the project. If the necessary funds cannot be identified
in a timely manner, the Administration recommends Option 2 to terminate the negotiations with
Haskell and enter into negotiations with the second proposer to develop a design/build contract
GMP.
Options to close the remaining budget gap for the project are addressed in the section below.
Capital Budget Funding Options
There are several funding options available to help close the gap in existing capital projects and/or
fund unfunded projects.
The current North Shore Branch Library site made up of 5 parcels (3 ocean front and 2 on Collins
Avenue) was evaluated and has been appraised to have a value of $75 million less legal,
brokerage, and subdivision fees. It is important to note that the City Attorney has opined that the
sale of the 3 oceanfront lots would be subject to voter referendum. The appraisal for the 2 parcels
on Collins Avenue is $10.5 million and their sale would not be subject to voter referendum. The
City Commission requested a second appraisal that should be available by the end July. One
option would be to sell the non -ocean -front lots without going to voter referendum. The second
option is to sell all 5 parcels and go to voter referendum in the Spring to avoid project delays. The
Administration recommendation is to issue an RFP with different options, evaluate the
submissions, and determine if voter referendum will be necessary.
The Property Management Department is exploring best practices and methods to maximize the
value of City -owned assets across the City's real estate portfolio. To facilitate this effort, CBRE
was engaged to conduct an inventory review of real estate assets owned by the City. As part of
the overall analysis, 5 vacant parcels were identified as strong candidates for potential sale.
These parcels have been reviewed by the Finance & Economic Resiliency Committee at their
March, April, and June meetings. Recent appraisals estimate that the 5 properties below could
be worth $16.2 million in total.
• 8100 Hawthorne Avenue — appraised value of $984,000
• 226-87 Terrace — appraised value of $4,600,000
• 16300 Pine Tree Drive — appraised value of $3,400,000
• Commerce Street— appraised value of $1,500,000
• Sunset Drive — appraised value of $5,700,000
At the July 23, 2021 FERC meeting, the FERC recommended that the Administration issue RFPs
for 4 of the 5 parcels and exclude the Sunset Island parcel (and explore designating it as a park).
The Barclay Plaza apartment building (Barclay) was acquired by the Miami Beach Community
Development Corporation (MBCDC) in 2007 using City Redevelopment Agency funds as
affordable workforce housing. This property is located to the east of the Miami Beach Convention
i
Page 1056 of 1657
FY 2022 Tentative Capital Budget and FY 2022 — 2026 ClP
September 17, 2021
Page 13 of 24
Center and south of Miami Beach Senior High School. In 2014, the property was red tagged by
the City's Building Department for having repeatedly failed to complete its 40 -year assessment.
The property was vacated of tenants by MBCDC that same year. In 2015, the Barclay, which had
received U.S. Department of Housing and Urban Development funds from the City, was acquired
by the City since MBCDC was in default of its funding agreement. The City acquired the building
vacant and boarded and has remained so the duration of the City's ownership. Subsequent to its
acquisition, the City issued two Requests for Proposals in search of a private workforce housing
developer for the site. Unfortunately, there were no responsive respondents to these RFP's.
Currently a feasibility study is underway, and the results should be available near the end of July.
An appraisal of the property was recently completed showing that the Barclay has a value of $8.3
million.
At the July 23, 2021 FERC meeting, the FERC recommended that the Administration issue an
RFP for the Barclay, with instructions to earmark the proceeds for workforce or affordable housing
or social services.
On May 26th, the City Commission approved the Seagull Hotel street vacation, which included a
voluntary monetary payment to the City in the amount of $7.4 million. The public benefit cash
payment to the City will be provided as follows:
• The first payment of $750,000 shall occur within 30 days of Historic Preservation Board
approval;
• The second payment of $3,325,000 shall occur prior to issuance of a building permit; and
• The third payment of $3,325,000 shall be prior to TCO or CO, whichever comes first.
The first two payments will likely be received in the next 6 months. However, the third payment
is likely to be received in approximately 2 to 3 years following construction of the project.
As the 2018 G.O. Bond program is implemented, savings have been identified from various
projects that are available to supplement other G.O. Bond projects in the same category that have
funding gaps. If any other one-time sources of funding are identified, the Administration will
evaluate opportunities to use them to close funding gaps for existing projects or help fund
unfunded capital projects.
Unfunded Projects
In addition to the projects noted above, the Administration highlighted the following unfunded
projects throughout the development of the FY 2022 - FY 2026 CIP. Funding for these projects
will be explored further in upcoming budget discussions.
• Collins Park Cultural Facility
• Byron Carlyle
• Old Fire Station #1
• Tight Urbanism
• Fleet Management Facility
• South Beach Promenade
• Others
Page 1057 of 1657
FY 2022 Tentative Capital Budget and FY 2022 — 2026 CIP
September 17, 2021
Page 14 of 24
PROJECT HIGHLIGHTS BY PROGRAM AREA
Art in Public Places (AIPP
The Art in Public Places (AiPP) Ordinance (Ordinance No. 95-2985) was adopted in 1995. The
Ordinance was created to "enhance the aesthetic environment of the City of Miami Beach by
including works of art on public property within the City and in City construction projects." The
AiPP Ordinance was amended in May 2004 to clarify the definition of terms for eligible
construction projects for funding, as well as the policies and procedures for appropriations. The
AiPP Guidelines were also adopted by the City Commission at that time.
The AiPP program is currently funded by 2% of all hard costs of City projects, including new
construction, additions, and costs for construction of joint private/public projects. The fund is used
for the commission or acquisition of works of art; conservation and maintenance of works of art;
research and evaluation of works of art; printing and distribution of related materials; and
administration.
The City Commission voted to amend the Art in Public Places Ordinance at the September 11,
2019 Commission meeting (Ordinance 2019-4296). The amendment expanded the definition of
"City Construction Project" to include bay walks, beach walks, streetscape beautification projects
(resurfacing, curbs, gutters, pavers, sidewalks, landscaping, lighting, bus shelters, bus benches,
street furniture, signage and similar above ground improvements); amended the dollar threshold
therein from $500,000 to $250,000 for the projects subject to the provisions of Art in Public Places;
and amended the amount to be appropriated to Art in Public Places from not less than 1.5 percent,
to not less than 2 percent.
The One -Year FY 2022 Capital Budget funds $85,000 for the conservation of the Tobias
Rehberger Obstinate Lighthouse.
Prior Years include $7.9 million in funding for the Miami Beach Convention Center, Fire Station
#2, Flamingo Park, and Lummus Park.
Brid es
Bridge repair projects are prioritized and funded based upon inspections by the Florida
Department of Transportation, which ensures the safety of all bridges statewide. Other factors are
also considered when determining the condition of a bridge, such as its load capacity. It is the
City's responsibility to ensure that bridges are repaired in order to be safe for the motoring public.
Pedestrian bridges are also included in this category, which is the City's responsibility to maintain.
The One -Year FY 2022 Capital Budget funds $750,000 for Citywide Bridges which includes
$600,000 for the 77th Street over Tatum bridge and $150,000 for pedestrian bridges citywide.
Prior Years include $7.1 million for the West Avenue Bridge over Collins Canal; $1.6 million for
Painting and Lighting of Bridges in North Beach; $925,202 for Citywide Bridges; $480,000 for the
41st Street Bridges Repair; $180,000 for the Lighting and Painting of the 81st Street Pedestrian
Bridge; and $60,875 for general bridge repairs. The unfunded portion of the five-year capital plan
includes $1.6 million for repairs of bridges citywide.
Page 1058 of 1657
FY 2022 Tentative Capital Budget and FY 2022 — 2026 C/P
September 17, 2021
Page 15 of 24
Community Center
The Recreation Division of the Parks and Recreation department provides citywide recreational,
cultural, and educational programs along with supporting activities for all age groups and those
with special needs. In addition to recreation, the City also offers a wide selection of facilities for
rental, from a park pavilion to an entire youth center.
Prior Years includes $2,500,000 for an Adaptive Fitness and Recreation Center.
Convention Center
The Miami Beach Convention Center (MBCC) has been a significant factor in the economic
impact of Miami Beach and the greater Miami -Dade County for over fifty years. It served as the
site where Cassius Clay (later known as Muhammad Ali) defeated Sonny Liston for his first
Heavyweight Championship of the World in 1964. In 1968, the Miami Beach Convention Center
hosted the Republican National Convention and more than 20,000 delegates; while in 1972, more
than 45,000 delegates visited the facility during both the Republican and Democratic National
Conventions.
Originally built in 1957, the MBCC encompassed 108,000 square feet. In 1968, an additional
130,500 square feet of exhibit space was added, with additional support facilities subsequently
constructed in 1974. In 1986, as the demand for exhibition space increased, the facility
underwent a $92 million renovation and doubled in size to its current footprint. The
expanded MBCC opened in 1989. At that time, a master plan was also developed for the
convention center complex. Since that time, the facility has received over $50 million in continuing
upgrades, including complete renovations of all restrooms, full carpet replacement, and
installation of a state-of-the-art telecommunications and networking infrastructure.
Since the 1989 MBCC renovation, significant changes have taken place in the convention and
tradeshow industry. The number of events, attendance, and space needs have increased on an
annual basis industry wide. The economic impact of the convention and tradeshow has also
increased over time. Many cities have responded to this industry growth by increasing the size of
their convention centers and by adding amenities such as increased meeting space, additional
parking, general session space, various technological amenities, and related features in an effort
to address industry trends.
Changes in how a competitive hotel package and cultural offerings are viewed by event planners
have also led to significant development in areas adjacent to the convention center in major
markets throughout the country. Large headquarter hotels have been developed, and efforts to
create walkable restaurant/retail environments surrounding convention centers have also been
undertaken. The primary objectives of the master plan project are improvements to the MBCC
and redevelopment of its surrounding area that are supported by market demand and are
necessary to facilitate the ability of the MBCC to attract high impact conventions and tradeshows
in an increasingly competitive environment.
A report prepared by Convention Sports & Leisure (CSL) commissioned by the Greater Miami
Convention and Visitors Bureau (GMCVB) determined that the MBCC shall serve as the region's
convention center given its geographic draw, and no new facility should be planned elsewhere in
Miami -Dade County. The report further determined that improvements to the MBCC, including a
multi-purpose general assembly/banquet hall, should be made to increase its marketability and
attract high-end conventions.
Page 1059 of 1657
FY 2022 Tentative Capital Budget and FY 2022 — 2026 CIP
September 17, 2021
Page 16 of 24
The expansion and renovation of the existing MBCC includes an expansion to 1.4 million square
feet, the re -orientation of the four exhibit halls, facade modifications, two separate loading docks
on opposite ends of the building with 32 dock spaces, site improvements along the canal and
roadways, the addition of a Grand Lobby, 1 Grand Ballroom and 4 junior ballrooms, including the
rooftop 'Sunset Vista Ballroom', 10,000 square foot production kitchen, 1.61 miles of fiber optic
cabling and 480 miles of copper wiring to support IT communications, 84 meeting rooms with free
Wi-Fi, and 800 parking spaces located on the roof. The new MBCC re -orients the halls in an
East/West direction with the primary access from Convention Center Drive, although Washington
Avenue will serve as a secondary means of entry.
The project includes substantial improvements to the north of the property. The new addition at
the northern portion of the property features an enclosed ground floor parking area and truck
loading and delivery area. Above this is the multi -story Grand Ballroom, offering two outdoor
patios spaces, with views of the beautified 3.8 acres of Collins Canal Park that spans along
Collins Canal and features the restored historic Carl Fisher Clubhouse. This addition creates a
new internalized loading area and includes two helix ramping entrance accesses to the roof level
parking. The Washington Avenue elevation will be predominately pedestrian in nature with the
elimination of the visitor drop-off and cab cueing areas. The streetscape modifications have
included a green edge along the avenue with native shade trees to promote a more pedestrian
friendly experience. Convention Center Drive becomes the main access point for vehicular access
and for the visitor and shared ride drop-off areas. Modifications include a new median along
Convention Center Drive and 19th Street creating a more sophisticated streetscape and a more
celebrated boulevard experience. The Collins Canal Park walk will be substantially improved and
will create a softer northern edge to the MBCC, with a continued path starting at the Holocaust
Memorial, continuing through the Botanical Gardens, into Collins Canal Park and ending at the
Bass Museum and Collins Park to connect multiple green spaces across multiple city blocks.
The project also includes sizeable Art in Public Places installations including pieces by six
internationally recognized artists such as Ellen Harvey, Sarah Morris and Joseph Kosuth, with a
budget of $7.1M. This collection is the largest collection of single curated public art in the United
States.
The full impact of the newly re -imagined Miami Beach Convention Center was expected to be
recognized during FY 2020 and FY 2021. This new, world class, venue represents a critical
revenue stream for the City of Miami Beach, as well as a tourism and destination attraction, and
will attract high-quality events that measurably benefit the City, its residents, visitors, and
businesses alike. It is expected that when the economy returns to normalcy, the fiscal impacts of
the renovated Center will be realized.
On July 25, 2018, Resolution 2018-30438 was passed and adopted by the City Commission. This
resolution called for a special election on November 6, 2018 for the purpose of submitting to the
electorate of the City of Miami Beach, a ballot question regarding a 99 -year lease of a 2.6 -acre
property to MB Mixed Use Investment, LLC, requiring the construction/operation of an 800 -room
hotel connected to the Convention Center per Resolution 2018-30425. The property is located at
the northeast corner of 17th Street and Convention Center Drive. On November 6, 2018, the
citizens of the City of Miami Beach voted in favor of the MBCC Hotel. The development of the
hotel has been approved by the Design Review Board. Once completed, the Convention Center
hotel will help attract even more high-quality events that would measurably benefit the City, its
residents, visitors, and businesses alike.
Page 1060 of 1657
FY 2022 Tentative Capital Budget and FY 2022 — 2026 CIP
September 17, 2021
Page 17 of 24
Prior Years include $615.4 million for the Convention Center Renovation; $9.5 million for the
Convention Center Park; $3.9 million for the Carl Fisher Clubhouse renovation; and $771,000 for
the Convention Center Garage Equipment.
Environmental
Environmental projects in the CIP cover a range of projects including beach access gates, canal
enhancement projects, tidal flooding mitigation, lighting for the baywalk, recreational greenways,
and remediation.
The One -Year FY 2022 Capital Budget funds $156,000 for the Miami Beach Mooring Field.
Prior Years include $2.7 million for the Middle Beach Recreational Corridor Phase 111; $1.1 million
for Maurice Gibb Park soil remediation; $386,000 for Baywalk Phase 2; $310,000 for the Baywalk
from 10th to 12th Street; $250,000 in funding for surveying and permitting costs related to the
Waterway Restoration G.O. Bond project; $111,000 for Fleet Management Facility Remediation;
and $30,000 for the Lake Pancoast Mangrove Living Shoreline (formerly known as the Indian
Creek Living Shoreline).
The unfunded portion of the five-year capital plan includes $6.0 million in G.O. Bond funding for
the Waterway Restoration project; $1.5 million for Lake Pancoast Mangrove Planter project; and
$310,000 for the Mooring Field.
Equipment
The capital equipment section of the CIP includes the purchase of major capital equipment,
including property management, fleet, lighting, and information technology equipment related
acquisitions.
The One -Year FY 2022 Capital Budget funds $7.4 million for annual vehicle/equipment
replacement; $475,000 for Skidata Garage Software upgrade with redundancy server; and re-
funding $100,000 for the Smart Building Automation System.
Prior Years include $20.5 million for Fleet vehicle/equipment replacement; $10.4 million for the
Public Safety Radio System (G.O. Bond project), and other major projects such as $1.9 million
for License Plate Readers (G.O. Bond project); $1.7 million for the replacement of the permitting
software; $1.5 million for cameras in the Entertainment District (G.O. Bond project); $903,000 for
Cameras on the Beachwalk between 23rd and 46th Streets; $825,000 for Cameras in the
Business District (G.O. Bond project); $700,000 for Cameras on the Beachwalk (G.O. Bond
project); $683,165 for post -implementation costs related to Tyler's enterprise products; and
$555,000 for new Police Station Generators. An additional 8 miscellaneous projects totaling
$1,198,102 were also funded within this program.
The unfunded portion of the five-year capital plan totals $21.1 million for various projects, primarily
related to vehicle and equipment replacement needs.
Page 1061 of 1657
FY 2022 Tentative Capital Budget and FY 2022 — 2026 C/P
September 17, 2021
Page 18 of 24
General Public Buildings
The One-Year FY 2022 Capital Budget includes the funding of: $400,000 for the North Shore
Park Youth Center exterior caf& and restrooms; $310,000 for the North Shore Bandshell rear
canopy; $200,000 for renovation of the Greenspace facility; and $61,000 for the Shane Rowing
Center roof replacement.
Prior Years include $4.0 million for Fire Station #1 (G.O. Bond project); $2.0 million for the Marine
Patrol Facility (G.O. Bond project); $1.9 million for Building Department's renovations; $1.5 million
for equipment and the buildout of the Real-Time Crime Center; $1.0 million for the Ocean Rescue
NOBE Facility (G.O. Bond project); $1.0 million for North Shore Park exterior caf6 and restrooms;
$750,000 million for the Bayshore Green Waste Facility; $668,225 for Sunset Islands 182
Guardhouse; $668,000 for the North Shore Bandshell Canopy; and $515,200 for 4 miscellaneous
projects.
The unfunded portion of the five-year capital plan includes $5.3 million for creating a Public Works
facility at a vacant/unused pump station; $443,000 for the Greenspace Facility Renovation;
$354,000 for the ice rink perimeter board at Scott Rakow Youth Center; $312,000 for North Shore
Park exterior cafe and restrooms; and $200,000 for the Fire department's outdoor training facility.
Programmed funding beyond FY 2022 includes future tranches for various G.O. Bond projects.
Golf Courses
The City operates the Miami Beach Golf Club and the Normandy Shores Golf Club. The golf clubs
are funded from the General Fund with all revenues generated going to the City to off-set
operational expenditures and debt service. The City's golf courses/clubs are managed and
operated by Professional Course Management (PCM) on behalf of the City.
The One-Year FY 2022 Capital Budget includes the funding of: $400,000 for renovation of the
Bayshore Park (Par 3); $114,000 for netting at the Miami Beach Golf ("MBG") driving range;
$125,000 for renovation of Normandy Shores Golf ("NSG") Club tee; $71,000 for replacement of
MBG reel grinders; $43,000 for replacement of MBG club kitchen floor; and $40,000 for the
replacement of the NSG Club carpet.
Prior Years include $10.5 million for renovations to the 'Bayshore Park (Par 3); $257,000 for the
MBG Club roof; $124,000 for the MBG course practice tee renovation; $100,000 for the MBG
course irrigation pump house renovation; and $97,909 for the MBG Club storage tank.
The unfunded portion of the five-year capital plan includes $6.0 million for the MBG course
renovation; $184,000 for the NSG Clubhouse roof; $196,000 for the NSG Club Pumps; $70,000
MBG Clubhouse painting; and $42,000 for the MBG Clubhouse carpet replacement.
Monuments
There are numerous monuments throughout the City, with of many of them being historic. In 2009,
the City conducted a comprehensive assessment of necessary repairs.
Prior Years include $323,700 for the Alton Road Fountain at 20th Street project; $289,000 for the
Flagler Monument Solar Illumination project; $62,000 for the World War Memorial; and $26,545
for the Cuban monument at the Miami Beach Police Department.
Page 1062 of 1657
FY 2022 Tentative Capital Budget and FY 2022 — 2026 C/P
September 17, 2021
Page 19 of 24
The unfunded portion of the five-year capital plan includes $820,000 for the Water Tower
Restoration on Star Island.
Parkina. Parkina Garaqes, and Parkinq Lots
The City manages and operates 62 surface parking lots and 12 garages. There is a total of 9,605
metered spaces both on- and off-street, 7,404 garage spaces, and 23 residential parking permit
zones citywide. The CIP programs provide funding for on-going maintenance of facilities, which
includes renovation of parking lots that are anticipated to provide additional parking spaces when
complete.
Prior Years for the Parking Garage/Parking programs include $27.6 million for the Collins Park
garage; $11.3 million for the 72nd Street Community Complex; $9.7 million for the garage at
Collins Avenue and 13th Street; $2.9 million for the Penrod's parking lot; $1.8 million for the 16th
Street Garage Roof and Deck; $1.4 million for the 16th Street Garage sprinkler system; $1.4
million for 17th Street Parking Garage coating; $1.4 million for Garage Security Camera System;
and 47 renewal and replacement projects totaling $11.1 million.
The One -Year FY 2022 Capital Budget includes $614,000 for 3 projects at the 7th Street Garage;
$575,000 for 3 projects at the Sunset Harbour Garage; $403,000 for 3 projects at the Penn
garage; $355,000 for 3 projects at the 17th Street Garage; $848,000 for 5 projects at the 16th
Street/Anchor Garage; $104,000 for 2 projects at the 12th Street Garage; $147,000 for 3 projects
at the 13th Street Garage; and 4 additional renewal and replacement projects totaling $425,000.
The unfunded portion of the five-year capital plan primarily reflects funding needs for repairs and
maintenance of the City's parking garages and lots totaling $8.8 million.
Parks
The City maintains the appearance of the gateways to the City, all municipal parks, buildings,
grounds, and City -controlled medians, swales, and landscape areas, including management of
the City's urban forest and the landscape maintenance contracts for the entire City's parking
facilities.
The One -Year FY 2022 Capital Budget for Parks totals $1.4 million and includes: $400,000 for
Collins Park Performing Arts Venue; $198,000 for repair of the South Pointe fishing pier railing;
$160,000 for the courts at the Flamingo Park Tennis Center; $156,000 for citywide parks' irrigation
system; $152,000 for landscaping improvements at citywide parks; $105,000 for court repairs at
citywide parks; $100,000 for replacement of fitness courses citywide; $70,000 for a non -motorized
vessel kayak launch; and $65,000 for the baseball stadium stand at Flamingo Park.
Prior Years funding for multiple open projects, inclusive of GOB projects, total $146.3 million.
Aside from the 19 GOB projects totaling $83.8 million, prior years includes major projects such
as $18.2 million for Flamingo Park; $15.8 million for North Beach Oceanside Park; $5.0 million for
Altos Del Mar Park; $3.3 million for Lifeguard Stand Replacements; $2.7 million for Muss Park
Facility; $2.6 million for the Band Shell Master Plan; $2.6 million for Maurice Gibb Park redesign;
$1.7 million for Brittany Bay Park; $1.5 million for Allison Park redesign; $1.4 million for Fairway
Park improvements; and $7.6 million for 18 smaller projects.
The unfunded portion of the five-year capital plan for the Parks department totals $92.0 million.
In addition, future funding needs total $1.5 million.
Page 1063 of 1657
FY 2022 Tentative Capital Budget and FY 2022 — 2026 CIP
September 17, 2021
Page 20 of 24
Renewal and Reolacement
FY 2012 was the first year that new and existing capital renewal and replacement projects were
included in the CIP and Capital Budget.
Prior to FY 2005, the City made significant investment in the routine maintenance of its assets,
as well as funding major capital projects bringing online miles of sidewalks and curbing, additional
streetlights, new parks and park facilities, new Fire station facilities, etc. However, maintenance
of the capital investments competed with General Fund services and routine maintenance with
the result that funding levels did not provide for major capital renewal and replacement projects.
As a result, these projects often were deferred many years beyond the useful life of the capital
component requiring replacement or renewal, and in some cases, until the point where an entire
capital project was required for major improvements.
To ensure that renewal and replacement of General Fund assets were funded and addressed
when needed, in FY 2005, the City of Miami Beach established a dedicated millage for renewal
and replacement funding to be used for capital projects that extended the useful life of the City's
General Fund assets to be used exclusively to provide for renewal and replacement of capital
items related to facilities and infrastructure over and above routine maintenance. The following
restrictions regarding the fund were established at the time that the dedicated funding was
created:
• Projects must meet the following criteria for funding:
o Extend the useful life of a City of Miami Beach General Fund asset by at least 5
years with a threshold value of at least $25,000; for example, the replacement a
major component of the asset such as roofs, HVAC systems, electrical systems, fire
alarm systems, sprinkler systems that due to significant deterioration would constrain
the remaining useful life of the asset, OR
o Significantly reduce future maintenance cost over the remaining life of the asset
providing for a reduction in future maintenance costs that are greater than the cost of
the project
• The Mayor and Commission may authorize additional uses of the funds for unforeseen
or unanticipated events affecting life, health, property or public safety subject to a five -
sevenths (5/7) vote
• Appropriation of project specific expenditures from the General Fund Capital Renewal and
Replacement Fund shall be included in the City Manager's annual proposed budget, to be
approved by the Mayor and City Commission annually during the City's second public
hearing on the budget
• Interest earnings that accrue in the General Fund Capital Renewal and Replacement Fund
shall be included in the appropriation for the Fund in the following fiscal year
• Changes among project specific appropriations may be authorized by the City Manager
to the extent that no new projects are added and the total annual allocation is not exceeded
• During a fiscal year, changes to the total allocation and changes to the list of projects to
be funded from the General Fund Capital Renewal and Replacement Fund shall require
prior approval and authorization by a majority of the City Commission. Excess project
specific appropriations not required will be available for re -appropriation the following year
• Project specific appropriations that are not expended in a given fiscal year shall remain in
the General Fund Capital Renewal and Replacement Fund for the life of the project
Page 1064 of 1657
FY 2022 Tentative Capital Budget and FY 2022 — 2026 C!P
September 17, 2021
Page 21 of 24
At the same time, the City established a systematic approach to identify renewal and replacement
needs. Facilities are inspected at least once every five years to determine current needs as well
as projected replacement dates for all major components. A Facility Condition Index Rating (FCI)
is assigned to each facility based on the total value of existing requirements divided by the current
replacement value of the building. Based on industry standards ratings are assigned as follows:
• 0.00 to 0.10 Excellent
• 0.11 to 0.21 Good
• 0.122 to 0.32 Fair
• Greater than 0.33 Poor
Facilities that have high public usage have a goal of "Excellent," while all other facilities have a
goal of "Good." Renewal and replacement projects for facilities that are not supported by the
General Fund are funded from available cash balances in their respective Internal Service or
Enterprise Funds, e.g. Fleet, Sanitation, Property Management, Water, Sewer, Storm Water,
Parking, and Convention Center. City Center Redevelopment Area (RDA) projects are funded
through the City Center RDA budget.
The current dedicated millage of 0.0235 mills (same as in FY 2021) is projected to generate
$815,000 for the General Fund Capital Renewal and Replacement fund. Internal Service Funds,
Enterprise Funds, and Special Revenue Funds also provide sources of funding for non -General
Fund Renewal and Replacement projects.
The One -Year FY 2022 Capital Budget has 36 projects totaling $5.6 million which includes:
$900,000 for the City Hall Chamber & Press Room renovation; $413,000, for Shane Rowing
Center's dock ramp and landing platform; $395,000 for waterway markers and signs; $358,000
for Normandy Isle Park pool renovations; $280,000 for parking deck cracks repair; $233,000
MBPD North Sub Station parking lot; $250,000 for additional security cameras at the Convention
Center; $223,000 for 1755 roof replacement; $200,000 for Bollards installation and replacement;
$184,000 for the Convention Center rubber walls and parking deck repairs; $175,000 Miami
Design Preservation League museum masterplan; $157,000 for Fleet security cameras; $156,000
for CCN at the North Beach Oceanside Park beachwalk; $150,000 for phase 2 of Fleet
enhancement upgrade; along with 22 projects totaling $1.5 million. Prior year appropriations total
$27.9 million.
Seawalls
The City of Miami Beach is part of a barrier island and seawalls perform an important function in
improving water quality and protecting upland structures such as roads and utilities.
The One -Year FY 2022 Capital Budget totals $5.0 million for Citywide seawall rehabilitation, with
$5.0 million also programmed in FY 2023. The five-year capital plan also includes future G.O.
Bond funding for Seawalls and Shorelines amounting to $5.0 million.
Prior Years funding for totals $30.2 million for Citywide seawall rehabilitation.
Page 1065 of 1657
FY 2022 Tentative Capital Budget and FY 2022 — 2026 CIP
September 17, 2021
Page 22 of 24
Street/Sidewalk/Streetscape Improvements
Projects within neighborhood areas are combined to create a single project that addresses
neighborhood needs for infrastructure upgrades (including underground water, sewer and storm
water infrastructure), traffic flow improvements, street lighting, and landscaping enhancements.
The One-Year FY 2022 Capital Budget totals $22.8 million, primarily for the 1 st Street-Alton Road
to Washington project totaling $20.0 million; the Convention Center Lincoln Road connector
project totaling $1.8 million; and $756,000 for the Meridian Avenue shared use path; along with 3
projects totaling $512,505, offset mainly by $297,000 from the defending of 2 projects in FY 2022.
Prior Year appropriations for open projects total $468.9 million and include several key projects
such as West Avenue, Palm and Hibiscus Island, Venetian Islands, Lincoln Road, 1 st Street-Alton
Road to Washington, West Ave/Bay Road, City Center, and Bayshore Neighborhood.
The unfunded portion of the five-year capital plan totals $480.1 million, and primarily includes
$292 million for drainage improvements in Normandy Isles and $96.0 million for the Town Center
project. In addition, future funding needs total $545.1 million in funding beyond FY 2026 includes
future tranches for various G.O. Bond projects. The prioritization of these projects are reflective
of the Jacobs Engineering study.
Street Lighting
Improving lighting throughout the City consistent with Lighting and Crime Prevention Through
Environmental Design (CPTED) principles was prioritized during the FY 2016 budget process.
Prior Years include $4.5 million for Street Lighting Improvements ($3.5 million funded by the G.O.
Bond); $2.5 million for the Smart Lighting Master Plan; $665,625 for the Beachwalk Lighting;
$450,000 for Citywide Parking Lot Lighting; and $148,779 for 5th Street Flyover Lighting.
The unfunded portion of the five-year capital and future plan includes $50.6 million for street
lighting improvements; $2.4 million for the street lighting master plan; in addition to funding of $6.5
million for the future tranche of the G.O. Bond Street Lighting Improvements project.
Transit/Transportation
The City is responsible for the management of transportation and traffic engineering services,
including coordination with the County for the provision of transit service; design and
implementation of traffic mobility improvements; coordination of the shared-bike program; and
implementation of the Bikeways Master Plan. Along with, and related to growth management,
traffic flow continues to be one of our community's major concerns.
The One-Year FY 2022 Capital Budget totals $1,971,000, which primarily includes $600,000 for
the entrance signs to North Beach; $520,000 for Prairie Avenue and 44th Street; $230,000 for La
Gorce/Pine Tree Drive bike lanes; $190,000 for the 10th Street Neighborhood Greenway;
$131,000 for Indian Creek Drive protected bike lanes; along with 3 projects totaling $300,000.
Page 1066 of 1657
FY 2022 Tentative Capital Budget and FY 2022 — 2026 C/P
September 17, 2021
Page 23 of 24
Prior Years include $42.5 million for the Transportation Capital Initiative and $18.8 million for the
Intelligent Transportation System. An additional 25 projects totaling $12.4 million were also
funded within this program.
The unfunded portion of the five-year capital plan totals $17.2 million.
Utilities
The City is responsible for the maintenance and operation of the water and sewer system that
provides reliable and high-quality water and a reliable sanitary sewer system that protects public
health and safety; and complies with all federal, state, and local regulations. The City purchases
wholesale water from Miami -Dade County for distribution within the City and the City also
operates and maintains the storm water collection and conveyance system that protects public
health and safety and complies with all federal, state, and local regulations.
The One -Year FY 2022 Capital Budget includes $7.8 million for water and wastewater mains and
rehabs; $2.9 million for waste water stations rehabilitation; $2.6 million for water pump station's
improvements; $1.9 million for the valve replacement program; $1.6 million for the wastewater
manhole rehabilitation; $1.5 million for FDOT utilities relocation; and $500,000 the DERM and
EPA consent decree. These projects are consistent with critical needs identified from the Jacobs
Engineering Study.
Prior years totaled $147.1 million and reflected the needs and priorities identified by the Hazen &
Sawyer study. The unfunded portion of the five-year capital plan totals $73.1 million for various
projects. Programmed funding, beyond FY 2026, amounts to $184.1 million for various
neighborhood improvement projects. .
GENERAL OBLIGATION BOND PROJECTS
On November 6, 2018, the citizens of the City of Miami Beach voted in favor of issuing $439
million in General Obligation bonds ("G.O. Bonds") to:
Improve the City's police, fire, and public safety facilities, in addition to equipment,
technology, and lighting to improve security throughout the City
Improve the City's parks, recreational and cultural facilities, inclusive of playgrounds,
baywalks, beachwalks, waterways, landscaping, equipment, lighting, security, and
parking related to such facilities
Improve the City's neighborhoods and infrastructure, including storm water and
flooding mitigation projects, sidewalk and street renovation and repairs, protected
bicycle lanes, pedestrian paths, landscaping, and lighting
At the March 4, 2019 G.O. Bond workshop, the City Commission reviewed the proposed G.O.
Bond Implementation Plan, which outlines the sequencing of the 57 approved projects. At the
March 13, 2019 Commission Meeting, the City Commission approved the G.O. Bond execution
plan for the first tranche and authorized the issuance of General Obligation Bonds, Series 2019,
for the funding of these projects. The fourth amendment to the FY 2019 Capital Budget, which
was approved at this meeting, allowed for the expedited funding of seven of these approved first
tranche projects in the amount of $19,760,000.
Page 1067 of 1657
FY 2022 Tentative Capital Budget and FY 2022 — 2026 C/P
September 17, 2021
Page 24 of 24
At the April 10, 2019 Commission Meeting, the City Commission approved the funding of the
remaining $131,379,000 of tranche 1 projects, for a total of $151,139,000, as summarized below
and detailed in attachment A.
• 19 Parks projects totaling $86,733,000
• 11 Public Safety projects totaling $36,406,000
• 8 Neighborhood/Infrastructure projects totaling $28,000,000
During FY 2021, interest rates were at historic lows, which provided a unique opportunity for the
City to revise the implementation plan of moving up funding for many projects. For example, the
original interest rates used during community outreach for the G.O. Bond were 4.25%. The actual
interest rates for Tranche 1 were lower at 3.5%, and our best estimate regarding rates for Tranche
2 was about 1.7%. The revised G.O. Bond implementation plan was estimated to save $21.2
million in debt service savings over the life of the bonds compared to the originally estimated debt
service costs in 2018. At the April 21, 2021 Commission Meeting, the City Commission approved
a revised G.O. Bond Implementation Plan that, in summary, proposed the following:
• Consolidating the number of tranches to take advantage of lower borrowing costs than
originally projected (3 four-year tranches instead of 4 three-year tranches)
• Reprioritizing projects, allowing the advancement of certain projects that were proposed
to commence in future tranches
• Realignment of 14 tranche 1 projects based on cashflow Projections
It is important to note that the total original budget for each project will remain the same over the
life of the G.O. Bond program. This revised plan only adjusted the timing of funding for the affected
projects. For more information, go to https://www.gombinfo.com/.
CAITAL BUDGET REQUEST SUBSEQUENT TO BUDGET BRIEFINGS
Over the summer recess, the Capital Improvement Projects Department requested additional
funding in the amount of $350,000 for the Convention Center - Carl Fisher Clubhouse project. In
order to complete the restoration of the clubhouse, it is necessary to finalize the site work east of
the building, that requires soil remediation, which was not included in the original scope of the
project. The additional funding is necessary to complete this remediation, in addition to sidewalks,
landscaping, and other associated site work. Funding is available in the 2015 RDA Bond for
Convention Center Project fund (Fund 309).
If the City Commission approves this increase in funding, FY 2022 Capital Budget will be updated
prior to the second Public Hearing on September 30, 2021.
CONCLUSION
The Administration recommends adopting the final Capital Improvement Plan for FY 2022 - 2026
and adopting the City of Miami Beach's final Capital Budget for FY 2022.
Attachment A — FY 2022 - 2026 Capital Improvement Plan Funding Summary
Attachment B — FY 2022 - 2026 Capital Improvement Plan by Program
ATH/JW/TOS
Page 1068 of 1657
Bc,; "`�,'C 171
PROJECT PROJECT NAME
ATTACHMENT A
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
Previous Yours FY 2025 FY 1033 FY 2024 FY 2025 FY 1026 Future Total
.. TRANSPORTATION
20018
FUND 106
ADAPTIVE TRAFFIC SIGNAL CONTROLS
-
1,800,000 1,800,000
20118
BAYSHORE NEIGH. TRAFFIC CALMING 1
378,075
378,075
20218
NAUTILUS TRAFFIC CALMING PHASE 1
355,500
-
-
355,500
20221
16TH STREET PROTECTED BIKE LANES
-
90,000
560,000
650,000
20318
VENETIAN ILLUMINATED CROSSWALKS
180,000
-
180,000
20617
NEW BUS SHELTER DESIGNS
504,251
-
-
504,251
20620
LA GORCE / PINE TREE DR BIKE LANES
-
230,000
1,570,000
- 1,800,000
21522
ALTON ROAD SHARED USE PATH PHASE II
3,631,000 3,631,000
60222
NORTH BEACH GREENWAYS PHASE III
-
150,000
1,170,220
- 1,320,220
60327
LOTH STREET NEIGHBORHOOD GREENWAY
190,000
224,000
1,080,000
1,494,000
62222
WEST AVENUE BICYCLE LANES PHASE II
108,000
533,072
641,072
62322
ORCHARD PARK TRAFFIC CALMING
138,000
843,054
981,054
66122
INDIAN CREEK DRIVE PROTECTED BIKE
-
131,000
-
-
131,000
112 RESILIENCY
Fund Total:
1,417,026
887A=
2,310,126
3;020,120
3,431000 - 13,866,172
20587
1 ST STREET-ALTON RD TO WASHINGTON
-
19,224,594
-
- 19,224,594
20597
WEST AVENUE PHASE 11
15,000,000
15,000,000
21220
INDIAN CREEK STREET DRAINAGE IMP.
4,998,548
-
4,998,548
24120
TOWN CENTER
-
8,455,496
8,455,496
26270
BAYSHORE PARK (PAR 3(
3,500,000
-
-
3,500,000
29020
CITYWIDE SEAWALL REHAB
-
5,000,000
5,000,000
10,000,000
29310
CONVENTION CNTR LINCOLN RD CONNECTOR
-
1,800,000
-
1,800,000
115 HUD
23220
SECTION .: LOAN
NORTH SHORE NEIGH. IMPROVEMENTS
Fund Total:
23,498,549
1,017,391
26,044,594
13,435,496
-
- - 62,976,63{
1,017,391
SUNSET
69790
ISLAND 3&4
UNDERGROUND121
SUNSET 3 & 4 UTILITY PAYMENT
Fund Total:
1,017,391
1,532,002
-
-
- - - 1,017,391
1,532,002
125 CAPITAL
20000
RENEWAL & REPLACEMENT
PAVEMENT & SIDEWALK PROGRAM
Fund Total:
1,534,004
37,986
-
-
463,000
-
- 1,532,002
500,986
20001
ALTON ROAD FOUNTAIN AT 20TH STREET
20,150
20,150
age 1069
ot 1657
PROJECT PROJECT NAME
ATTACHMENT A
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
Previous Years FY 2022 FY 2023 FY 4024 FY 3025 FY 2026 Futuro Total
20237
FAIRWAY PARK IMPROVEMENTS
1,923
1,923
21818
PROPERTY MGMT FACILITY GENERATOR
100,000
100,000
21821
MBPD HEADQUARTERS RENOVATION
99,600
99,600
27800
STREET LIGHTING IMPROVEMENTS
300,000
300,000
28550
LIFEGUARD STAND REPLACEMENTS
141,189
141,189
60007
POLICE STATION NEW GENERATOR
555,000
555,000
60030
POLICE STATION MEN'S LOCKER ROOM
241,371
-
241,371
60031
WATER TOWER RESTORATION STAR ISLAND
-
820,000
820,000
60038
SOUTH SHORE C.C. FIRE ALARM RENEWAL
11,370
11,370
60057
FIRE STATION 3 EMERGENCY GENERATOR
25,200
25,200
60418
HISTORIC CITY HALL HUMIDITY CONTROL
96,068
96,068
60420
FIRE STATION 2 -A/C REPLACEMENT
52,500
52,500
60519
CITY HALL 40 -YR STRUCTURAL
154,800
154,800
60520
MBPD-CONDENSER AND PUMPS
-
125,000
125,000
60618
HISTORIC CITY HALL FIRE ALARM
151,618
-
151,618
60718
NORTH SHORE PARK YOUTH CENTER A/C
80,000
80,000
60719
UNIDAD ELEVATOR MODERNIZATION
70,000
-
70,000
60821
CITY HALL -REPLACE RESTROOM EXHAUST
-
35,000
35,000
61021
MB POLICE GARAGE CONCRETE SPARING
833,000
833,000
61100
P.A.L. BUILDING • FIRE ALARM
74,500
74,500
61120
CITY HALL -COOLING TOWER BASE
100,000
-
100,000
61121
SCOTT RAKOW YOUTH CENTER -KITCHEN
-
150,000
150,000
61221
NORM. ISLE POOL LOCKER ROOM & PUMPS
-
250,000
250,000
61290
CITY HALL FIRE ALARM SYSTEM
293,325
-
293,325
61320
UNIDAD BUILDING -DOOR RENEWAL
63,000
63,000
61321
71ST STREET WELCOME SIGN RENOVATION
40,000
40,000
61420
UNIDAD BUILDING -WINDOW SEAL RENEWAL
40,000
40,000
61521
CITY HALL LOADING DOCK RESURFACING
70,000
70,000
61921
10TH ST. AUDIT. ENTRANCE DRAINAGE
250,000
250,000
62117
FIRE STATION #2 TRAINING TOWER
160,800
160,800
62421
COLONY THEATER LED LIGHTS UPGRADE
-
40,000
40,000
62622
HISTORIC CITY HALL FRONT ELEVATION
69,000
69,000
62822
INTERNAL AFFAIRS RESTROOM RENO
-
139,000
139,000
Page 1070 of 1657
ATTACHMENT A
q 3
1P / iy , ;I 1�. � � " yti I B Ez , 179
PROJECT PROJECT NAME
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
Previous Years FY 2022 FY 2023 FY 2024 FY 2025 FY 2026
Futuro Total
62920
FIRE STATION #2 WATERPROOFING
192,000
-
- -
192,000
62922
BASS MUSEUM EXTERIOR WALL REPAIRS
-
39,000
39,000
62923
FLAMINGO PARK HURRICANE WINDOWS
98,000
98,000
63022
MIAMI CITY BALLET EXIT SIGN RENEWAL
73,000
73,000
63023
HISTORIC CH 2ND FLOOR RESTROOMS
-
74,000
74,000
63080
BEACH RESTROOMS PAINT AND CONCRETE
225,000
-
225,000
63123
MBPD GARAGE LED LIGHT UPGRADE
-
110,000
110,000
63222
COLONY THEATER EXIT SIGN RENEWAL
36,000
36,000
63223
BOYS & GIRLS CLUB SECURITY ENCLOSURE
27,000
27,000
63323
MBPD NESS DOCK RENOVATION
77,000
77,000
63350
POLICE HQ ELEVATORS & OTHER PROJECT
384,260
-
384,260
63420
NS YOUTH CNTR ROOFTOP A/C RENEWAL
120,000
120,000
63422
HISTORIC C. HALL ENERGY EFF. WINDOW
-
52,000
52,000
63423
NORMANDY POOL LIGHTING IMPROVEMENT
41,000
41,000
63523
FIRE STATION 1 BATHROOMS RENOVATION
120,000
120,000
63623
FIRE STATION 1 ROLL -UP DOOR RENEWAL
-
51,000
51,000
63718
SANITATION INTERIOR REPLACEMENT
312,800
-
312,800
63721
FIRE STATION #1 ROOF REPAIRS
41,500
41,500
63723
FIRE ADMINISTRATION FLOORING RENEWAL
-
34,000
34,000
63821
MBPD 4TH FLOOR HVAC CONTROLS
312,000
-
312,000
63823
FIRE ADMIN BLDG UPS SYSTEM RENEWAL
-
39,000
39,000
63921
1701 MERIDIAN AVE 50 YEAR RECERTIFICATION
50,500
-
50,500
64020
CITY HALL CARD ACCESS SYSTEM REPL.
80,436
80,436
64021
HISTORIC CITY HALL 90 YEAR RECERTIFICATION
66,000
66,000
64221
BASS MUSEUM WINDOW REPLACEMENT
67,355
67,355
64222
1755 MERIDIAN FRESH AIR INTAKES
-
63,000
63,000
64320
CIN HALL -COOLING TOWER CONDENSER
90,000
90,000
64322
1755 MERIDIAN ROOF REPLACEMENT
-
82,000
-
82,000
64420
CITY HALL RESTROOM RENOVATIONS
-
250,000
250,000
64422
MBPD GARAGE EXIT SIGNS AND SAFETY
31,000
-
31,000
64522
MBPD MAIN ROOF REPAIRS
136,000
136,000
64622
SCOTT RAKOW YOUTH CENTER LIGHTING
115,000
-
115,000
65120
GREENSPACE FACILITY SECURITY SYSTEM
-
110,000
110,000
Page 1071
ot 1657
/[\/-, I i\ N'. A I BEA("" H
PROJECT PROJECT NAME
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
Previous Years FY 2022 FY 2023 FY 2074 FY 2025 FY 2026
ATTACHMENT A
Futuro Total
65218
PURDY AVE BOAT RAMP REPAIRS
84,661
84,661
65219
SOUTH POINTE PARK HVAC REPLACEMENT
85,000
85,000
65319
CODE / HOUSING OFFICES RELOCATION
588,475
588,475
65320
UNIDAD INTERIOR & EXTERIOR PAINTING
- 90,000
90,000
65420
MBPD NORTH SUB STATION PARKING LOT
233,000 -
233,000
65520
MBPD N SUB STATION PAINTING, FLOORING
- 234,000
234,000
65720
HISTORIC CH -ROOF ACCESS LADDER
-
100,000
100,000
65821
FILLMORE ESCALATOR REPAIRS
71,525
-
71,525
65920
MBFD STATIONS SECURITY UPGRADES CW
-
126,000
126,000
66220
HISTORIC CITY HALL ELEVATOR
320,000
-
320,000
67030
MARINE PATROL EXTERIOR RESTORATION
60,728
60,728
67040
NORMANDY ISLE PARK & POOL
200,000
200,000
67200
FIRE STATION 3 FIRE ALARM UPGRADE
55,000
55,000
67220
FIRE STATION 3 EMERGENCY GENERATOR
43,955
43,955
67240
777 BUILDING HVAC 4TH FLOOR
162,121
162,121
68720
POLICE HQ & PARKING GAR. FIRE ALARM
246,033
246,033
68760
CITY HALL ELECTRICAL UPGRADES
341,500
341,500
69220
PUBLIC WORKS FACILITY GENERATOR
195,863
-
195,863
126 SOUTH
65219
Fund Total:
POINTE RENEWAL & REPLACE
SOUTH POINTE PARK HVAC REPLACEMENT
7,044,1112
25,000
780,000 51108A00 - - -
-
- 12,992,112
25,000
• CULTURAL
20418
Fund Total:
ARTS COUNCIL ENDOWMENT
COLLINS PARK PERFORMING ARTS VENUE
25,000
800,000
- - - - -
- 23,000
800,000
142 7TH STREET
20026
Fund Total:
GARAGE
7TH STREET GARAGE -ELEVATOR
800,000
- 400,000
400,000
21121
7TH ST GARAGE -ENTRANCE FLOOD CONTROL
-
278,000
278,000
22150
72 ST. COMMUNITY COMPLEX
128,296
128,296
26100
GARAGE SECURITY CAMERA SYSTEM
53,585
53,585
27830 PARKING GARAGE AT 1262 COLLINS AVE 2,563,569 2,563,569
60124 7TH STREET GARAGE -LANDSCAPING 120,000 120,000
60224 7 ST GARAGE -SUPERSTRUCTURE RENEWAL 250,000 250,WO
Page 1072 of 165 1
PROJECT PROJECT NAME
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
Previous Years FY 2022 FY 2023 FY 2024 FY 2025 FY 2026
ATTACHMENT A
Future Total
60422
7TH ST GARAGE -FIRE SPRINKLER & PUMP
- 300,000
300,000
60620
7TH STREET GARAGE -INTERIOR DRAINAGE
30,000 -
30,000
60623
7TH STREET GARAGESTAIRWELL RAILING
- 25,000
25,000
60723
7TH ST GARAGE -TRAFFIC COATING
- 150,000
150,000
61118
7TH STREET GARAGE UPGRADE LIGHTING
127,993 -
127,993
61218
7TH STREET PARKING GARAGE ROOF TOP
140,251 -
140,251
62621
7TH STREET GARAGE-OFFICE/RESTROOM
- 36,000
36,000
64719
7TH STREET GARAGE -DOOR REPLACEMENT
50,000 -
50,000
65121
7 STREET GARAGE UPS BATTERY SYSTEM
66,600
66,600
67520
7TH STREET GARAGE -ROOFING REPAIRS
45,756
45,756
68220
7TH ST GARAGE SURFACE RESTORATION
95,000
95,000
69310
7TH ST. GARAGE FIRE ALARM SYSTEM
51,087
51,087
147 ART IN
20377
Fund Total:
PUBLIC PLACES
AIPP MB CONVENTION
3,355,137 614,000 175AM 150,000 650A00 -
7,530,797
- 4,911,137
7,530,797
22618
AIPP FIRE STATION 2
95,334
95,334
22718
AIPP FLAMINGO PARK PROJECT
194,000
194,000
22918
AIPP LUMMUS PARK PROJECT
116,000
116,000
22150 72 ST. COMMUNITY COMPLEX 300,000 300,000
27830
PARKING GARAGE AT 1262 COLLINS AVE
7,145,125
7,145,125
28080
INTELLIGENT TRANSPORT SYSTEM
3,192,028
3,192,028
CONCURRENCY158
20200
Fund Total:
TRANSPORTATION CAPITAL INITIATIVE
11,644,1/5
8,192,028
- -
- - 11,344,185
8,192,028
20247
CITYWIDE PARKS IRRIGATION SYSTEM
-
156,000
156,000
25750
WEST AVE BRIDGE OVER COLLINS CANAL
908,068
908,068
27910
MERIDIAN AVE SHARED USE PATH
-
756,000
756,000
28080
INTELLIGENT TRANSPORT SYSTEM
10,322,972
-
10,322,972
60321
CITYWIDE PARKS COURT REPAIRS
-
105,000
105,000
60325
NORMANDY SHORES GOLF CLUB TEE RENO
-
125,000
125,5
Page 1073
ot 1657
11 B b2ik(�� H1
PROJECT PROJECT NAME
ATTACHMENT A
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
Previous Years FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 Future Total
60421
CITYWIDE FITNESS COURSE REPLACEMENT
100,000
100,000
62022
FLAMINGO PARK TENNIS CENTER COURTS
30,000
30,000
62122
NORMANDY SHORES GOLF CARPET REPLACEMENT
40,000
40,000
62222
WEST AVENUE BICYCLE LANES PHASE 11
23,000
23,000
62322
ORCHARD PARK TRAFFIC CALMING
-
76,000 630,813
706,813
62521
NORTH BEACH GREENWAYS- PHASE II
604,230
110,000
714,230
62718
N. BEACH PARKS RESTROOM RESTORATION
91,000
91,000
64621
CITYWIDE PK LANDSCAPING IMPROVEMENT
152,000
152,000
65221
PINE TREE DRIVE AND 46TH STREET
603,603
-
603,603
65321
PRAIRIE AVENUE AND 44TH STREET/CHAS
-
520,000
520,000
66222
71 ST STREET BRIDGE BIKE LANES
-
100,000
100,000
69820
NORTH BEACH GREENWAYS PHASE 1
448,625
448,625
RESORT
20200
TAX FUND 2%
TRANSPORTATION CAPITAL INITIATIVE
Fund Total:
21,079,526
10,000,000
2,394,000 630,413
- 24,094,339
10,000,000
164 RDA CITY
29300
CENTER RENEWAL & REPLACEMENT
LINCOLN RD LENOX-COLUNS W/SIDE STR
Fund Total:
10A0 AM
20,000,000
- -
- 10,000,000
20,000,000
64819
COLONY THEATER - FIRE ALARM SYSTEM
78,000
78,000
66120
LINCOLN RD STONE RESTORATION
214,619
214,619
165 NON
20197
- TIF ., FUND
CITY CENTER RESILIENCY ENHANCEMENTS
Fund Total: ''
: '20;292,619
1,000,000
-
- - 20,292,619
1,000,000
20200
TRANSPORTATION CAPITAL INITIATIVE
8,000,000
8,000,000
66120
LINCOLN RD STONE RESTORATION
153,381
153,381
169 MIAMI
27780
CITY BALLET FUND
MIAMI CITY BALLET WINDOWS
Fund Total:
9,153,391
315,000
- - -
- 9,153,391
315,000
64618
MIAMI CITY BALLET VARIOUS REPAIRS
278,250
278,250
Fund Total:
593,250
- -
- 393,250
21014 BICYCLE LANES/SHARED USE PATH IMPROVEMENT - 844,247 1,980,000 2,824,247
Page 1074 of 1657
PROJECT PROJECT NAME
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
Previous Years FY 2022 FY 2023 FY 2024 FY 2025 FY 2026
ATTACHMENT A
Futuro Total
23020
ALTON RD & 16TH STREET INTERSECTION
540,000
540,000
64918
SMART LIGHTING MASTER PLAN
203,000
- -
203,000
HALF
Fund Total:
CENT TRANS. SURTAX
COUNTY187
2A38400
- 844,247 - 11930,000 -
3,262,247
20220
SEAWALL -DICKENS AV SHORELINE
200,000
-
200,000
20597
WEST AVENUE PHASE II
530,000
530,000
20718
SIGNALIZATION ALTON RD AND 4TH ST
580,000
580,000
20818
ROYAL PALM NEIGHBORHOOD GREENWAY
430,000
430,000
21014
BICYCLE LANES/SHARED USE PATH IMPROVEMENT
130,000
130,000
21319
ROYAL PALM AVE & 467H STREET CIRCLE
107,000
(107,000)
21419
MERIDIAN AVENUE PEDESTRIAN CROSSING
410,000
410,000
22518
ENHANCED CROSSWALKS
480,000
480,000
23360
WEST AVE/BAY RD NEIGH.
378,000
378,000
25650
CITYWIDE CURB RAMP INSTALLATION
80,560
80,560
25750
WEST AVE BRIDGE OVER COLLINS CANAL
1,966,380
1,966,380
26700
ROW IMPROVEMENT PROJECT
1,844,084
1,844,084
27860
51ST STREET NEIGHBORHOOD GREENWAY
50,000
50,000
27910
MERIDIAN AVE SHARED USE PATH
278,000
278,000
27930
SHARED PATH ON PARKVIEW ISLAND PARK
320,000
320,000
27940
EUCLID AVE. • FROM 17TH ST & 5TH ST
470,000
470,000
28050
EVERGLADES COURT ALLEYWAY PAVING
300,000
300,000
28080
INTELLIGENT TRANSPORT SYSTEM
2,761,260
2,761,260
29500
COLLINS CANAL ENHANCEMENT PROJECT
1,030,698
1,030,698
29810
ALLEYWAY RESTORATION PH III
412,500
-
412,500
62322
ORCHARD PARK TRAFFIC CALMING
-
31,505
31,505
62517
MERIDIAN AVENUE BICYCLE LANES
250,000
-
250,000
62617
72ND STREET PROTECTED BIKE LANE
519,000
519,000
62717
73RD STREET PROTECTED BIKE LANES
239,000
239,000
65321
PRAIRIE AVENUE AND 44TH STREET/CHAS
84,420
84,420
65518
JEFFERSON AVE & 15TH ST BEACONS
- -
74,200
74,200
Fund Total:
301 CAP. PROJ. NOT FINANCED BY :•
20001 ALTON ROAD FOUNTAIN AT 20TH STREET
13,925,102
24,550
(73,495) - - -
13,849,607
24,550
age 1075
ot 1657
"/-\J'v �'I B, ,' I �
PROJECT PROJECT NAME
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
Previous Years FY 2022 FY 2023 FY 2024 FY 2025 FY 2026
ATTACHMENT A
Future Total
20110
28TH STREET OBELISK STABILIZATION
357,230
357,230
20200
TRANSPORTATION CAPITAL INITIATIVE
3,300,000
3,300,000
20220
SEAWALL -DICKENS AV SHORELINE
231,974
231,974
20597
WEST AVENUE PHASE II
8,861
8,861
22050
BAYSHORE NEIGH. BID PACK A
223,199
223,199
22150
72 ST. COMMUNITY COMPLEX
1,000.000
1'000'00c)
23200
FLAMINGO PARK
896,690 -
896,690
23518
BATTING CAGES AT NORTH SHORE PARK
203,000
203,000
24530
SUNSET ISLANDS 1 &2 GUARDHOUSE
468,225
468,225
24630
FLAGLER MONUMENT SOLAR ILLUMINATION
89,000
89,000
26270
BAYSHORE PARK )PAR 3)
412,100
412,100
26990
SECOND FL. RENOVATION -BUILDING DEPT
629,898 -
629,898
27950
NORTH BEACH OCEANSIDE PARK
9,710,000 283,000
9,993,000
62718
N. BEACH PARKS RESTROOM RESTORATION
190,000 -
190,000
63318
NORMANDY ISLE PARK POOL RENOVATIONS
47,000
47,000
64718
MUNIS / ENERGOV/ ERP PR
683,165
683,165
1,059,729
Fund Total:
17,474,992 293,000 1,000,000
- - 18,757,092
STREET PAVEMENT 15,000,000 15,000,000
20187
LUMMUS PARK MUSCLE BEACH UPGRADE
68,000
68,000
20220
SEAWALL -DICKENS AV SHORELINE
3,420
-
- 3,420
20237
FAIRWAY PARK IMPROVEMENTS
1,426,914
877,000
877,000 3,180,914
20247
CITYWIDE PARKS IRRIGATION SYSTEM
14,275
-
- 14,275
20250
LAGORCE ISLAND -LIGHTING TREES MISC
66,376
-
66,376
20300
NORMANDY ISLE PARK TURF INSTALLATION
398,000
465,500
465,500 1,329,000
20418
COLLINS PARK PERFORMING ARTS VENUE
- 400,000
422,000
822,000
20423
FLAMINGO PK FOOTBALL FENCE
-
613,000
613,000
20425
FLAMINGO PARK SOCCER FIELD TURF
-
261,000 - 281,000
20523
STILLWATER PARK LIGHTING 8 SOCCER
-
- 481,000 481,000
20577
BELLE ISLE PARK PLAYGROUND
294,585
- 294,585
20597
WEST AVENUE PHASE II
1,469,640
1,469,640
20607
11TH STREET -FLAMINGO NEIGHBORHOOD
1,059,729
1,059,729
20623
MIAMI BEACH GOLF COURSE RENOVATION
-
6,000,000 6,000,000
Page 1076 ot 1657
V'! - A I B c AC H
PROJECT PROJECT NAME
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
Previous Years FY 2022 FY 2023 FY 2024 FY 2023 FY 2026
ATTACHMENT A
Futuro Total
20721
GREENSPACE FACILITY RENOVATION
200,000 443,000
643,000
20722
FLAMINGO PK PLAYGROUND REPLACEMENT
830,000
830,000
20723
CRESPI PARK LIGHTING & MICRO SOCCER
- 481,000
481,000
20821
BISCAYNE ELEM SHARED FIELD LIGHTING
1,270,170 -
1,270,170
20822
FLAMINGO PK FOOTBALL STADIUM TURF
1,163,000
1,163,000
20918
BRITTANY BAY PARK
1,414,729
-
-
1,414,729
20921
NORMANDY ISLE PARK PLAYGROUND
489,000
489,000
21018
BAYWALK PHASE 2
386,000
-
-
386,000
21021
NSPYC KITCHEN & CABINETRY ADDITION
344,000 -
344,000
21022
WEST LOTS 85-86 ST CONVERSION
-
2,436,100
2,436,100
21118
STILLWATER ENTRANCE SIGN
-
225,000
225,000
21621
ADAPTIVE FITNESS AND RECREATION CTR
2,500,000
-
2,500,000
21721
REAL TIME CRIME CENTER BUILDOUT
1,500,000
1,500,000
21821
MBPD HEADQUARTERS RENOVATION
32,437
32,437
22050
BAYSHORE NEIGH. BID PACK A
960,405
960,405
22150
72 ST. COMMUNITY COMPLEX
100,000
100,000
22420
POLO PARK LIGHTING & SOCCER FIELD
857,680
857,680
22750
ALTOS DEL MAR PARK
44,820
44,820
22920
CITYWIDE BRIDGES
925,202
750,000 750,000
800,000
3,225,202
23118
FIRE STATION 4 SECURITY ENHANCEMENT
50,683
-
50,683
23180
BAYSHORE NEIGH. BID PACK D
745,500
745,500
23200
FLAMINGO PARK
554,489
554,489
23240
LA GORCE NEIGHBORHOOD IMPROVEMENTS
219,000
219,000
23318
SOUNDSCAPE AUDIO IMPROVEMENTS
751,410
751,410
23380
PALM & HIBISCUS ISLAND ENHANCEMENT
50,000
50,000
24530
SUNSET ISLANDS 1 &2 GUARDHOUSE
200,000
200,000
24630
FLAGLER MONUMENT SOLAR ILLUMINATION
200,000
200,000
25750
WEST AVE BRIDGE OVER COLLINS CANAL
1,303,396
1,303,396
27170
SEAWALL-BISCAYNE BAY ST END PH. II
185,714
- 185,714
27800
STREET LIGHTING IMPROVEMENTS
-
50,000,000 50,000,000
27950 NORTH BEACH OCEANSIDE PARK 500,000 (283,000) 217,000
27990 MAURICE GIBB PARK FLOATING DOCK 177,000 177,000
28300 SHANE WATERSPORT SEAWALL 134,000 134,000
age 1077 of 1657
BEA
PROJECT PROJECT NAME
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
Previous Yuan FY 1022 FY 2023 FY 1024 FY 2025 FY 2026
ATTACHMENT A
Futuro Total
28600
NSPYC EXTERIOR CAFE AND RESTROOMS
- 400,000
312,000
712.000
28850
MAURICE GIBB PARK REDESIGN
28,658
28,658
28940
BAYSHORE NEIGH. CENTRAL- SOUTH
21,824
21,824
29550
CMB SKATEPARK
40,000
40,000
29620
ALLISON PARK REDESIGN
100,000
100,000
29810
ALLEYWAY RESTORATION PH III
-
100,000
100,000
60011
IRRIGATION SYSTEM MACARTHUR CAUSEWAY
-
28,000
28,000
60020
FLEET MGMT-GENERATOR TRANSFER SWITCH
100,000
-
-
100.000
60026.
BELLE ISLE PARK PLAYGROUND REPLACEMENT
-
638,000
638,000
60226
PARK VIEW ISLAND PARK PLAYGROUND REPLACEMENT
497,000
497,000
60122
SOUNDSCAPE PK LED LIGHTING
75,000
75,000
60123
CRESPI PARK PLAYGROUND REPLACEMENT
407,000
407,000
60126
MUSS PARK PLAYGROUND REPLACEMENT
-
638,000
638,000
60223
POLO PARK PLAYGROUND REPLACEMENT
-
476,000
-
476,000
60321
CITYWIDE PARKS COURT REPAIRS
105,000
105,000
105,000
105,000 105,000
525,000
60322
PARKS MAINT. FACILITY RENOVATIONS
-
335,000
- -
335,000
60323
STILLWATER PLAYGROUND REPLACEMENT
-
570,000
-
- -
570,000
60421
CITYWIDE FITNESS COURSE REPLACEMENT
100,000
100,000
100,000
100,000 100,000
500,000
60523
FLAMINGO FOOTBALL STADIUM RAILINGS
-
100,000
-
-
- -
100,000
60920
HISTORIC CITY HALL-VFD REPLACEMENT
200,000
-
-
200,000
60924
NSPYC SAFETY IMPROVEMENTS•FRONT DESK
-
372,000
372,000
61020
CITY HALL•GENERATOR REPLACEMENT
600,000
600,000
61619
NORTH BEACH ROW LANDSCAPING
113,000 -
113,000
61621
CITY HALL CHAMBER & PRESS ROOM RENO
- 900,000
900,000
61920
MAURICE GIBB SOIL REMEDIATION
896,000
-
896,000
62019
MIDDLE BEACH ROW LANDSCAPE
8,285 36,000
250,000
100,000
394,285
62619
ENERGY SUB -METERS IN MUN. BUILDINGS
68,000 -
68,000
62719
FLEET MGMT FACILITY REMEDIATION
111,000
-
111,000
62723
SCOTT RAKOW ICE RINK PERIMETER BOAR
-
354,000
354,000
62819
LAKE PANCOAST MANGROVE LIVING SHORELINE
30,000
1,450,000
1,480,000
62823
SCOTT RAKOW ICE RINK REFRIGERATION
1,128,000
-
1,128,000
62919
OUTDOOR TRAINING FACILITY (FIRE)
-
200,000
200,000
63019
BUILDOUT 1701 4TH FL FOR HOUSING
133,000
133,000
age 1078 ot 1657
PROJECT PROJECT NAME
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
Previous Years FY 2012 FY 2023 FY 1024 FY 2025 FY 2026
ATTACHMENT A
Future Total
63080
BEACH RESTROOMS PAINT AND CONCRETE
20,000
20,000
63319
PARK VIEW ISLAND ANNEX - DOG PARK
67,000
-
67,000
63519
BUOY PARK REFORESTATION IMPROVEMENT
150,000
-
150,000
63521
RESTORATIVE TREE WELL CITYWIDE
480,000
240,000
720,000
63719
1755 MERIDIAN -CHILLER REPLACEMENT
211,045
-
-
211,045
63722
SMART CARD ACCESS SYSTEM -PHASE II
-
195,000
195,000
63819
SSCC ROOT MITIGATION & FLOORING REP
272
-
-
272
63822
1755 ROOF REPLACEMENT
-
223,000
223,000
63919
SMART CARD ACCESS SYSTEM- PHASE 1
250,000
250,000
64019
CITY HALL ENERGY EFFICIENT BUILDING
156,000
156,000
64022
777 FOUNTAIN/ COURTYARD RENOVATIONS
-
131,000
131,000
64119
INDIAN CREEK LANDSCAPE & IRRIGATION
836,500
-
836,500
64122
BOLLARDS INSTALLATION AND REPL.
-
200,000
302,500
502,500
64190
ENTRANCE SIGNS TO NORTH BEACH
-
356,000
91,000
447,000
64418
THE FILLMORE 40 -YR RECERTIFICATION
622,298
-
-
-
- - 622,298
64621
CITYWIDE PK LANDSCAPING IMPROVEMENT
-
248,000
200,000
200,000 200,000 200,000 1,048,000
64721
MIDDLE BEACH WATER TOWER PAINTING
50,000
-
50,000
64821
SECURITY ENHANCEMENTS CITYWIDE
500,000
1,000,000
500,000
500,000 2,500,000
64918
SMART LIGHTING MASTER PLAN
1,000,000
1,000,000
64921
OCEAN RESCUE FIRE ALARM RENEWAL
30,300
30,300
65021
BELLE ISLE PARK LIGHTING ENHANCEMENT
110,000
110,000
65519
BRIDGE REPAIRS FY19
60,875
-
60,875
65622
SHANE ROWING CENTER ROOF REPLACEMENT
-
61,000
61,000
65722
FLAMINGO PARK BASEBALL STADIUM STAN
-
65,000
495,000
560,000
65818
FLEET MANAGEMENT FIRE SPRINKLER
250,000
-
250,000
65821
FILLMORE ESCALATOR REPAIRS
16,000
-
-
16,000
65822
MIAMI BEACH MOORING FIELD
156,000
310,000
466,000
65922
TOBIAS REHBERGER OBSTINATE LIGHTHOUSE
-
85,000
85,000
66018
FLEET MANAGEMENT CONCRETE SPALLING
100,000
-
100,000
66020
CITY HALL - MAIN ENTRANCE PAVERS
-
550,000
550,000
66021
SOUTH POINTE PARK RESTROOMS RENOVATION
66,000
66,000
66418
FLAMINGO POOL DECK & PUMP ROOM
-
334,000
334,000
66518
SECURITY AUDIO SYSTEM FOR ALL POOLS
-
100,000
100,000
age 1079
of 1657
PROJECT PROJECT NAME
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
Previous Years FY 2022 FY 2023 FY 2024 FY 2023 FY 2026
ATTACHMENT A
Future Total
67920
SMART BUILDING AUTOMATION SYSTEM
100,000
100,000
68120
NORMANDY SHORES GOLF CLUB PUMPS
196,000
196,000
69520
WATERWAY RESTORATION
250,000 -
250,000
303 GRANT
23380
Fund Total:
FUNDED
PALM & HIBISCUS ISLAND ENHANCEMENT
23,639,161 3,649,000 12,839,000 817117670 4,710,100
480,209
1,324,000 72,1140,000 199,679,231
480,209
.. CAPITAL
20918
Fund Total:
RESERVE
BRITTANY BAY PARK
480,209 -
295,000
- 480,209
295,000
21270
VENETIAN NEIGH. -ISLANDS
(320)
(320)
22750
ALTOS DEL MAR PARK
384,823
384,823
23180
BAYSHORE NEIGH. BID PACK D
639,000
639,000
23200
FLAMINGO PARK
295,000
295,000
23300
FLAMINGO NEIGHBORHOOD -SOUTH
2,185,327
2,185,327
23360
WEST AVE/BAY RD NEIGH.
30,000
30,000
23380
PALM & HIBISCUS ISLAND ENHANCEMENT
3,288,290
3,288,290
25750
WEST AVE BRIDGE OVER COLUNS CANAL
2,224,213
2,224,213
28610
RUE VENDOME PUBLIC PLAZA
717,705
717,705
28940
BAYSHORE NEIGH. CENTRAL - SOUTH
618,790
618,790
29600
MUSS PARK FACILITY
245,000
245,000
65218
PURDY AVE BOAT RAMP REPAIRS
180,033
180,033
305 SB QUALITY
20001
Fund Total:
OF LIFE REST.TAX 11%
ALTON ROAD FOUNTAIN AT 20TH STREET
11,102,861 - - -
279,000
- - 11,102,861
279,000
20011
WORLD WAR MEMORIAL
62,000
62,000
20177
OCEAN DR. EXTENDED SIDEWALK PROJECT
164,650
164,650
20187
LUMMUS PARK MUSCLE BEACH UPGRADE
232,000 -
232,000
20223
LUMMUS PARK PLAYGROUND REPLACEMENT
750,000
750,000
20597
WEST AVENUE PHASE II
67,781
67,781
21119
BAYWALK 10TH TO 12TH STREET
310,000
310,000
21218
STH STREET FLYOVER LIGHTING
148,779
148,779
21821
MBPD HEADQUARTERS RENOVATION
49,900
49,900
22118
ENTERTAINMENT DISTRICT CAMERAS
170,000
170,000
Page 1UbU Ot 1657
4\M 1FACH
PROJECT PROJECT NAME
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
Previous Years FY 2022 FY 2023 FY 2074 FY 2025 FY 2016
ATTACHMENT A
Futuro Total
23200
FLAMINGO PARK
2,460,322
2,460,322
25750
WEST AVE BRIDGE OVER COLLINS CANAL
334,000
334,000
27360
RESTORATIVE TREEWELL-PH 4 -SOUTH BCH
690,000
690,000
27800
STREET LIGHTING IMPROVEMENTS
201,988
201,988
27990
MAURICE GIBB PARK FLOATING DOCK
373,000
373,000
28550
LIFEGUARD STAND REPLACEMENTS
1,798,800
1,798,800
28560
COLLINS PK LIGHTING SOUND SYSTEM
236,000
236,000
29760
RESTORATIVE TREEWELL-PH 3
683,911
683,911
60022
FLAMINGO PARK NORTH -SOUTH WALKWAY
-
300,000
300,000
60177
SOUTH BEACH PEDESTRIAN ZONES
300,000
300,000
60420
FIRE STATION 2 -A/C REPLACEMENT
18,700
18,700
60720
BEACHWALK TREE WELLS 14-22 STREET
150,000
150,000
61419
BEACHFRONT RESTROOMS-RENOVATIONS
25,000
25,000
62021
COLONY THEATER ELEVATOR
- 87,000
87,000
62022
FLAMINGO PARK TENNIS CENTER COURTS
- 130,000
130,000
62117
FIRE STATION #2 TRAINING TOWER
160,800 -
160,800
62119
BASS MUSEUM - ROOF REPLACEMENT
392,464
392,464
62121
BOTANICAL GARDENS RESTROOMS
50,500
50,500
62217
10TH ST AUDITORIUM COATING OF ROOF
65,650
65,650
62221
COLONY THEATER RESTROOM RENOVATION
-
73,000
73,000
62321
COLONY THEATER EXTERIOR PAINTING
68,000
68,000
62419
BASS MUSEUM - FREIGHT ELEVATOR
88,647
88,647
62519
BEACHWALK DRAINAGE•S.POINTE - 23 ST
220,000
220,000
62523
ARTISTIC BOLLARDS
-
250,000
250,000
63080
BEACH RESTROOMS PAINT AND CONCRETE
15,275
15,275
63122
LOTH ST AUDITORIUM LED UPGRADE
- -
104,000
104,000
63720
10TH ST AUDITORIUM -LOUVER
52,000
52,000
63923
BASS MUSEUM KEYSTONE SEAL
-
63,000
63,000
64023
MIAMI CITY BALLET VARIABLE AIR VALVE
34,000
34,000
64123
COLONY THEATER IMPACT GLASS
-
103,000
103,000
64221
BASS MUSEUM WINDOW REPLACEMENT
67,355
-
67,355
64223
BASS MUSEUM INTERIOR GALLERY WALL
63,000
63,000
64321
BASS MUSEUM CONDENSER WATER PUMPS
45,450
45,450
Page 1061 of 1557
PROJECT PROJECT NAME
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
Previous Years FY 2022 FY 2073 FY 2024 FY 2025 FY 2026
ATTACHMENT A
Futuro Total
64323
MIAMI CITY BALLET ACCESS CONTROL
-
50,000
50,000
64421
MBPD CUBAN MONUMENT RESTORATION
26,545
26,545
64423
MIAMI CITY BALLET UV LIGHT RETROFIT
-
33,000
33,000
64521
10TH ST AUDITORIUM HEAT PUMP RENEWAL
191,900
-
191,900
64523
MIAMI CITY BALLET BOARD ROOM CARPET
-
88,000
88,000
64621
CITYWIDE PK LANDSCAPING IMPROVEMENT
200,000
-
200,000
64623
BASS MUSEUM GALLERY FLOOR RENOVATION
226,000
226,000
64723
10TH STREET AUDITORIUM SECURITY ENHANCEMENT
-
34,000
34,000
64823
BASS MUSEUM TRANQUILITY FOUNTAIN
46,000 -
46,000
64918
SMART LIGHTING MASTER PLAN
664,012
400,000 200,000 200,000
1,464,012
65220
MIAMI CITY BALLET STUDIO FLOORING
140,000
39,000
- - -
179,000
65222
MDPL MUSEUM MASTERPLAN
175,000
175,000
65422
WATERWAY MARKERS 8. SIGNS
263,000
263,000
65522
BASS MUSEUM 40 YEAR RECERTIFICATION
-
100,000
100,000
65721
MXE LAND USE/MOBILITY/ECONOMIC DEVELOPMENT
STUDY
190,000
(190,000)
-
65821
FILLMORE ESCALATOR REPAIRS
74,694
74,694
66021
SOUTH POINTE PARK RESTROOMS RENOVATION
20,000
-
20,000
66022
SOUTH POINTE PARK SPLASH PAD
249,000
249,000
66420
DADE BOULEVARD PEDESTRIAN PATHWAY
225,000
-
225,000
66520
SOUTH BEACH ROW LANDSCAPE
280,000
300,000 100,000
680,000
66720
COLONY THEATER40UND AND VIDEO
-
107,000 -
107,000
66920
S. P. PARK -FISHING PIER RAILING REP
-
198,000
-
198,000
67120
SOUNDSCAPE PARK IMPROVEMENTS
28,000
28,000
67360
BASS MUSEUM EMERGENCY GENERATOR
133,900
133,900
68820
BEACH RESTROOMS EXHAUST SYSTEMS
19,000
19,000
69620
S. BOWL SIGNAGE/ PAINTING/ LIGHTING
150,000
150,000
0. MB.
20108
Fund Total:
MIAMI B. GOLF COURSE PRACTICE TEE
12,203,023
124,000
11134A00
3,341 AN 300A00 200.000
- 16,400A23
124,000
20110 - 28TH STREET OBELISK STABILIZATION 2502000 250,000
20123 INDIAN BCH PK PLAYGROUND EXPANSION 792,000 - 792,000
20321 BEACHVIEW PK PLAYGROUND REPLACEMENT - 505,000 505,000
Page 1082 of 1657
PROJECT PROJECT NAME
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
Previous Years FY 2022 FY 2023 FY 2024 FY 2025 FY 2026
ATTACHMENT A
Futuro Total
20330
MIDDLE BEACH REC CORRIDOR PH II
1,425,000
-
1,425,000
20521
JULIA TUTTLE ENTRANCE SIGN
275,000
275,000
20820
MB GOLF COURSE STORAGE TANK
97,909
97,909
21019
SHORT-TERM 41 ST ST RECOMMENDATIONS
100,000
100,000
21120
MIAMI BEACH GOLF CLUBHOUSE ROOF
257,000
257,000
21420
MB GOLF COURSE IRRIGATION PUMP
100,000
100,000
21620
SECURITY CAMERAS ON BEACHWALK 23.46
903,000
903,000
26270
BAYSHORE PARK SPAR 3)
1,990,000
400,000
2,390,000
27800
STREET LIGHTING IMPROVEMENTS
493,600
493,600
28070
MIDDLE BEACH REC. CORRIDOR PH III
2,675,000
2,675,000
28550
LIFEGUARD STAND REPLACEMENTS
540,000
540,000
28850
MAURICE GIBB PARK REDESIGN
1,973,482
1,973,482
29600
MUSS PARK FACILITY
2,450,000
2,450,000
29810
ALLEYWAY RESTORATION PH III
60,000
60,000
60077
FIRE STATION 2 ALARM SYSTEM
10,000
-
10,000
60121
BEACHVIEW FITNESS COURSE REPLACEMENT
146,000 -
146,000
60824
MB GOLF CLUBHOUSE CARPET REPLACEMENT
- 42,000
42,000
61419
BEACHFRONT RESTROOMS-RENOVATIONS
26,000
26,000
61719
41 ST STREET BRIDGES REPAIR
480,000
480,000
61819
BEACHWALK DRAINAGE - 24 ST TO 46 ST
100,000
-
100,000
61822
MB GOLF CLUB DRIVING RANGE NETTING
-
114,000
114,000
61919
41 ST STREET FOUNTAIN RESTORATION
82,000
82,000
61922
MB GOLF CLUBHOUSE PAINTING
-
70,000 -
70,000
62019
MIDDLE BEACH ROW LANDSCAPE
82,000
100,000
50,000 50,000
282,000
62023
MB GOLF CLUB KITCHEN FLOOR REPLACEMENT
43,000
- -
43,000
62117
FIRE STATION #2 TRAINING TOWER
80,091
80,091
62423
SECURITY CAMERA BEACHWALK • MID BCH
890,000 890,000
1,780,000
62523
ARTISTIC BOLLARDS
-
250,000 -
250,000
63622
MB GOLF CLUB REEL GRINDERS REPLACEMENT
-
71,000
-
71,000
64119
INDIAN CREEK LANDSCAPE & IRRIGATION
363,500
-
363,500
64121 FIRE STATION #3 40 YEAR RECERT. 48,700 48,700
64918 SMART LIGHTING MASTER PLAN 200,000 400,000 200,000 200,000 1,000,000
65218 PURDY AVE BOAT RAMP REPAIRS 200,000 - - 200,000
Page 1083 of 1667
of I
,f IACH
! roti, d"�5`,���I, 11M
PROJECT PROJECT NAME
ATTACHMENT A
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
Previous Years FY 2022 FY 2023 FY 1024 FY 2025 FY 2026 Future Total
65322
MIAMI BEACH GOLF CLUB LAKE AERATION
45,000
45,000
65422
WATERWAY MARKERS 8 SIGNS
132,000
132,000
66322
NON -MOTORIZED VESSEL KAYAK LAUNCH
-
70,000
400,000
470,000
68820
BEACH RESTROOMS EXHAUST SYSTEMS
9,000
9,000
307 NB QUAIL
20023
Fund Total:
ALLISON PARK PLAYGROUND REPLACEMENT
16,912,242
973,M
-
2,401,000 1,"7,000 200AM -
795,000
- 21,235,282
795,000
20421
NORTH SHORE BANDSHELL REAR CANOPY
310,000
-
310,000
20627
NORTH SHORE BANDSHELL CANOPY
668,000
-
668,000
20920
NORTH SHORE BANDSHELL REAR SEATING
188,000
188,000
22150
72 ST. COMMUNITY COMPLEX
346,000
346,000
22218
NORTH BEACH YARD
59,263
59,263
22750
ALTOS DEL MAR PARK
1,350,000
1,350,000
25380
BAND SHELL MASTER PLAN
1,133,372
1,133,372
26500
KAYAK LAUNCH DOCKS
644,080
-
644,080
27800
STREET LIGHTING IMPROVEMENTS
717
629,000
629,717
27950
NORTH BEACH OCEANSIDE PARK
3,675,000
3,675,000
28550
LIFEGUARD STAND REPLACEMENTS
540,000
540,000
28600
NSPYC EXTERIOR CAFE AND RESTROOMS
1,001,000
1,001,000
28610
RUE VENDOME PUBLIC PLAZA
1,794,000
1,794,000
28630
BONITA DRIVE STREET END IMPROVEMENT
135,000
135,000
29550
CMB SKATEPARK
150,280
150,280
29620
ALLISON PARK REDESIGN
1,432,000
1,432,000
29810
ALLEYWAY RESTORATION PH III
60,000
60,000
60237
COLONS / HARDING ALLEY RESTORATION
100,000
100,000
60921
N. SHORES GOLF CLU&CLUBHOUSE ROOF
184,000
184,000
61219
N. SHORE TENNIS FACILITY FENCE
47,000
-
47,000
61319
N. SHORE BANDSHELL PLUMBING REPAIRS
30,000
30,000
61419
BEACHFRONT RESTROOMS-RENOVATIONS
87,000
- -
87,000
61619
NORTH BEACH ROW LANDSCAPING
157,000
300,000 100,000
557,000
62523 ARTISTIC BOLLARDS 250,000 250,000
62623 SECURITY CAMERA BEACHWALK - NORTH BCH - - 647,500 647,500 1,295,000
63318 NORMANDY ISLE PARK POOL RENOVATIONS 17,000 358,000 375,000
Page 1084 of 160f
{1
r` h11 I I".) E Ar,,.,'1--,
PROJECT PROJECT NAME
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
Previous Tears FY 2022 FY 2013 FY 2024 FY 2023 FY 2026
ATTACHMENT A
Future Total
63522
NORTH SHORE BANDSHELL SIGNAGE REPL.
97,000
97,000
64160
PAINTING & LIGHTING OF BRIDGES
1,585,000
1,585,000
64190
ENTRANCE SIGNS TO NORTH BEACH
58,000
244,000
831,679
1,133,679
64722
SHANE ROWING CENTER HVAC UNITS REPLACEMENT
-
61,000
61,000
64822
SHANE ROWING CENTER DOCK RAMP
-
-
227,000
227,000
64918
SMART LIGHTING MASTER PLAN
396,883
-
400,000
200,000 200,000
1,196,883
64922
NORTH BEACH OCEANSIDE PARK CCN SEG
156,000
156,000
65921
71ST STREET BUSINESS CORRIDOR LIGHT
69,000
-
69,000
67140
81ST ST PEDESTRIAN BRIDGE
180,000
180,000
68820
BEACH RESTROOMS EXHAUST SYSTEMS
7,000
7,000
•: RESORTBONDS
28160
Fund Total:
2015
CONVENTION CENTER RENOVATION
13,910,593
216,632,193
11119,000
2,103,500
2,408,179 995.000
22,348,274
216,632,193
•• •.• SERIES
28160
Fund Total:
2015A
CONVENTION CENTER RENOVATION
216,632,193
268,602,420
- 216,692,193
268,602,420
28170
CONVENTION CENTER PARK
7,750,000
7,750,000
28180
CONVENTION CENTER - CARL FISHER
3,647,580
3,647,580
29310
CONVENTION CNTR LINCOLN RD CONNECTOR
10,000,000
10,000,000
29320
17TH STREET NORTH IMPROVEMENTS
2,000,000
2,000,000
320 GENERAL
20597
Fund Total:
CAPITAL -MDC ILA
WEST AVENUE PHASE 11
292,000,000
7,390,575
-
-
-
2",000,000
7,390,575
21220
INDIAN CREEK STREET DRAINAGE IMP.
352,755
352,755
23000
SUNSET HARBOUR PUMPSTATION UPGRADES
989,081
989,081
i35• PALM
23380
Fund Total:
ISLAND UNDERGROUND
PALM & HIBISCUS ISLAND ENHANCEMENT
8,732,411
1,337,096
-
- r
- 8,732,41 T
1,337,096
Fund Total:
1,337096
-
-
-
1,337096
25750 WEST AVE BRIDGE OVER COLLINS CANAL 59,952 59,952
Fund Total:' 239,932 - - - - 239,952
Page 1U85 ot 1657
PROJECT PROJECT NAME
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
Previous Years FY 2022 FY 2023 FY 2024 FY 2025 FY 2026
ATTACHMENT A
Future Total
365 CITY CENTER
23270
.. CAP FUND
CITY CENTER COMMERCIAL DISTRICT BPB
13,539,610
13,539,610
23300
FLAMINGO NEIGHBORHOOD -SOUTH
18,932
18,932
23360
WEST AYE/BAY RD NEIGH.
750,000
750,000
25650
CITYWIDE CURB RAMP INSTALLATION
1,500
1,500
25980
BASS MUSEUM GENERATOR
117,816
117,816
26010
BASS MUSEUM HYDRAULIC ELEVATOR
66,127
66,127
27070
BEACHWALK LIGHTING RETRO
665,625
665,625
27600 SEAWALL -BOTANICAL GARDEN 1,208,662 1,208,662
27780
MIAMI CITY BALLET WINDOWS
126,799
126,799
28010
COLLINS PARK PARKING GARAGE
25,521,271
25,521,271
28160
CONVENTION CENTER RENOVATION
6,914,221
6,914,221
28180
CONVENTION CENTER - CARL FISHER
265,320
265,320
29300
LINCOLN RD LENOX-COLLINS W/SIDE STR
20,000,000 - - -
- - - 20,000,000
29500
COLLINS CANAL ENHANCEMENT PROJECT
2,999,999
2,999,999
29530
COLLINS PARK ANCILLARY IMPROVEMENTS
4,000,000
4,000,000
29880
LINCOLN RD MALL ADA PEDESTRIAN
87,500
87,500
23200
Fund Total:
76,283,339
- 76483,332
BELLE ISLE PARK PLAYGROUND 230,000 230,000
21270
VENETIAN NEIGH. -ISLANDS
23,355
23,355
23000
SUNSET HARBOUR PUMPSTATION UPGRADES
440,800
440,800
28850
MAURICE GIBE PARK REDESIGN
626,542
626,542
61920
MAURICE GIBB SOIL REMEDIATION
196,000
196,000
67420
FLAMINGO PARK POOL PLAYGROUND
65,383
65,383
369 GULF
64822
Fund Total:
BREEZE BOND -OTHER
SHANE ROWING CENTER DOCK RAMP
1,582,080 - -
413,000
- 1,382,080
413,000
370 RCIP -1996
20577
Fund Total:
15M GO BOND
BELLE ISLE PARK PLAYGROUND
411000 -
5,566
- - - 413,000
5,566
22750
ALTOS DEL MAR PARK
315,849
315,849
23200
FLAMINGO PARK
336,423
336,423
Page 1086 ot 1657
'1 4 , I '
)NM
I V l 1� i �..�i
PROJECT PROJECT NAME
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
Previous Years FY 2012 FY 2023 FY 2024 FY 1025 FY 2016
ATTACHMENT A
Future Total
67420
FLAMINGO PARK POOL PLAYGROUND
104,175
104,175
373 99 •
22050
BONDS -NEIGHBORHOOD IMPRO
BAYSHORE NEIGH. BID PACK A
Fund Total::
769,013
(200(
762,013
12M
23180
BAYSHORE NEIGH. BID PACK D
3,828
3,828
23220
NORTH SHORE NEIGH. IMPROVEMENTS
427,541
427,541
23240
LA GORCE NEIGHBORHOOD IMPROVEMENTS
64,203
64,203
23300
FLAMINGO NEIGHBORHOOD�SOUTH
164,785
164,785
23360
WEST AVE/BAY RD NEIGH.
197,991
197,991
374 GULF
23200
BREEZE
FLAMINGO PARK
Fund Total:
858,148
137,080
- - $36,148
137,080
376 99 GO
21270
BONDS - NEIGHBORHOOD IMP
VENETIAN NEIGH. -ISLANDS
Fund Total:
137,080 -
2,930,534
- - ' 137,080
2,930,534
22050
BAYSHORE NEIGH. BID PACK A
417,634
417,634
23220
NORTH SHORE NEIGH. IMPROVEMENTS
245,045
245,045
23240
LA GORCE NEIGHBORHOOD IMPROVEMENTS
61
61
23360
WEST AVE/BAY RD NEIGH.
13,527
13,527
23380
PALM & HIBISCUS ISLAND ENHANCEMENT
47,808
47,808
377 99 GO
22750
BONDS - PARKS & BEACHES
ALTOS DEL MAR PARK
Fund Total:
3,654,609 - -
109,643
- - - 3,654,609
109,643
23200
FLAMINGO PARK
203,400
203,400
379 SOUTH
20587
POINTE RDA
1 ST STREET-ALTON RD TO WASHINGTON
Fund Total:
313AM - -
4,669,616
- 313,043
4,669,616
23018
SOUTH POINTE PARK LIGHTING
585,000
585,000
23300
FLAMINGO NEIGHBORHOOD -SOUTH
261,194
261,194
27370
54IN DIAMETER REDUNDANT SEWER FORCE
990,000
990,000
60177
SOUTH BEACH PEDESTRIAN ZONES
650,000
650,000
61117
RESTORATIVE TREE WELL TREATMENT
145,000
145,000
Fund Total:
7,=,810 - - -
- 7,300,810
Page 1U8 I Of
I AM I BE A�C H
PROJECT PROJECT NAME
ATTACHMENT A
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
Previous Years FT 2022 FY 2023 FY 2024 FY 2025 FY 2026 Future Total
382 2003
G.O. BONDS -FIRE
3,010,683
3,010,683
60057
FIRE STATION _3EMERGENCY GENERATOR
100,000
100,000
60077
FIRE STATION 2 ALARM SYSTEM
89,000
89,000
67220
FIRE STATION 3 EMERGENCY GENERATOR
66,045
66,045
2003383
20237
Fund Total:
BONDS -PARKS & BEACHES
FAIRWAY PARK IMPROVEMENTS
255,043 - - -
116
- 233,045
116
20577
BELLE ISLE PARK PLAYGROUND
46,349
46,349
22750
ALTOS DEL MAR PARK
2,790,357
2,790,357
23200
FLAMINGO PARK
4,648,453
4,648,453
67420
FLAMINGO PARK POOL PLAYGROUND
76,026
76,026
23380
Fund Total:
7,561,301 - - -
- - 7,561,301
20597
WEST AVENUE PHASE II
3,010,683
3,010,683
20607
11TH STREET -FLAMINGO NEIGHBORHOOD
1,511,349
1,511,349
21270
VENETIAN NEIGH. -ISLANDS
3,669,649
3,669,649
22050
BAYSHORE NEIGH. BID PACK A
3,106,901
3,106,901
23180
BAYSHORE NEIGH. BID PACK D
300,344
300,344
23220
NORTH SHORE NEIGH. IMPROVEMENTS
668,191
668,191
23240
LA GORCE NEIGHBORHOOD IMPROVEMENTS
372,930
372,930
23300
FLAMINGO NEIGHBORHOOD -SOUTH
56,353
56,353
23360
WEST AVE/BAY RD NEIGH.
3,878,208
3,878,208
23380
PALM & HIBISCUS ISLAND ENHANCEMENT
567,822
567,822
25750
WEST AVE BRIDGE OVER COLONS CANAL
65,738
65,738
28940
BAYSHORE NEIGH. CENTRAL - SOUTH
4,170,522
4,170,522
29500
COLLINS CANAL ENHANCEMENT PROJECT
1,428,192
1,428,192
60257
BAY DRIVE NEIGHBORHOOD GREENWAY
100,000
100,000
388 SOUTH
20330
Fund Total:
POINTE POST .. CDT
MIDDLE BEACH REC CORRIDOR PH II
23A16,682 - - -
6,888,442
- - - 23,416,882
6,888,442
20587
1ST STREET-ALTON RD TO WASHINGTON
70,931
70,931
20597 WEST AVENUE PHASE 11 501,093 501,093
a ,a11 AAA I B E AC H
PROJECT PROJECT NAME
ATTACHMENT A
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
Previous Years FY 2022 FY 2023 FY 2024 FY 2025 FY 1026 Futuro Total
23200
FLAMINGO PARK
5,562,273
5,562,273
26270
BAYSHORE PARK (PAR 3)
4,558,090
4,558,090
27950
NORTH BEACH OCEANSIDE PARK
1,907,075
1,907,075
66718
BEACH STORAGE AREA ENCLOSURE
170,000 -
170,000
23360
WEST AVE/BAY RD NEIGH.
Fund Total: 19,3110,973 70,931
- - 19,657,904
1ST STREET-ALTON RD TO WASHINGTON 4,741,799 704,475 5,446,274
20607
1 1TH STREET -FLAMINGO NEIGHBORHOOD
552,777
552,777
21220
INDIAN CREEK STREET DRAINAGE IMP.
2,500,368
2,500,368
23000
SUNSET HARBOUR PUMPSTATION UPGRADES
551,300
551,300
23270
CITY CENTER COMMERCIAL DISTRICT BPB
3,381,241
3,381,241
23360
WEST AVE/BAY RD NEIGH.
4,900,000
4,900,000
23618
LENOX COURT & JEFFERSON AVE SEAWALL
300,000
300,000
25650
CITYWIDE CURB RAMP INSTALLATION
10,500
10,500
26340
PENRODS AT 1 OCEAN DR. PARKING LOT
2,798,310
2,798,310
27370
541N DIAMETER REDUNDANT SEWER FORCE
6,600,000
6,600,000
28550
LIFEGUARD STAND REPLACEMENTS
300,000
300,000
28740
SEAWALL - HOLOCAUST MEMORIAL
100,000
100,000
28780
SEAWALL DADE BLVD - WASHINGTON AVE
1,625,000
1,625,000
28790
CONVENTION CENTER DR TO WASHINGTON
1,800,000
1,800,000
28820
INDIAN BEACH PARK SEAWALL
715,000
715,000
29560
BRITTANY BAY PARK SEAWALL
1,109,000
1,109,000
61117
RESTORATIVE TREE WELL TREATMENT
147,000
147,000
65219
SOUTH POINTE PARK HVAC REPLACEMENT
50,000
50,000
66618
SOUTH POINTE PK -FIRE ALARM RENEWAL
35,000
35,000
390 MIAMI-DADE
23200
Fund Total:
COUNTY BOND
FLAMINGO PARK
3'1,217,193 704,473 -
3,099,000
- - - 32,921,770
3,099,000
25380
BAND SHELL MASTER PLAN
1,500,000
1,500,000
391 2019
250-19
25019
Fund Total:
• -
GO BONDS - PARKS
GO#1: 72 ST. COMMUNITY COMPLEX
4,399,000 - -
10,800,000
- 4,399,000
10,800,000
25119
GO#2: COLLINS PARK
557,287
557,287
Page 1089 Of
PROJECT PROJECT NAME
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
Previous Years FY 2022 FY 2023 FY 2024 FY 2025 FY 2026
ATTACHMENT A
Future Total
25219
GO#3: CRESPI PARK
184,921
184,921
25319
GO#4: FAIRWAY PARK
260,000
260,000
25419
GO#5: FLAMINGO PARK & YOUTH CENTER
15,400,000
15,400,000
25719
GO#8: LUMMUS PARK
4,737,000
4,737,000
25819
GO#9: MARJORY STONEMAN DOUGLAS PARK
682,000
682,000
25919
GO#10: MAURICE GIBE PARK
4,500,000
4,500,000
26119
GO#12: NOSE OCEANSIDE PARK BEACHWALK
2,000,000
2,000,000
26219
GO#13: N.SHORE PARK & YOUTH CENTER
3,540,000
3,540,000
26319
GO#15: PAR 3 / BAYSHORE PARK
15,700,000
15,700,000
26419
GO#17: POLO PARK
493,675
493,675
26519
GO#18: SCOTT RAKOW YOUTH CENTER
4,053,045
4,053,045
26619
GO#19: SOUNDSCAPE PARK
4,500,000
4,500,000
26719
GO#23: BAYWALK PEDESTRIAN BRIDGE
10,000,000
10,000,000
26819
GO#24: MIDDLE BEACH BEACHWALK PH3
4,500,000
4,500,000
27119
GO#29: WEST LOTS
1,000,000
1,000,000
27219
GO#30: SKATE PARK
750,000
750,000
28919
GO#26: ROOFS FOR CULTURAL FACILITIES
2,932,631
2,932,631
67819
GO#21: STILLWATER PARK
142,441
142,441
Fund Total:
06,733,000 -
- 06,733,000
22819
GO#57: CAMERAS. ENTERTAINMENT DIST.
1,4YU,0W
1,490,000
23119
GO#49: PUBLIC SAFETY RADIO SYSTEM
9,700,000
9,700,000
28319
GO#45: FIRE STATION #1
4,000,000
4,000,000
28419
GO#46: OCEAN RESCUE NOBE FACILITY
1,000,000
1,000,000
28519
GO#47: LICENSE PLATE READERS
1,950,000
1,950,000
28719
GO#53: SECURITY FOR PUBLIC SPACES
2,000,000
2,000,000
28819
GO#54: MARINE PATROL FACILITY
2,000,000
2,000,000
68519
GO#48: POLICE HQ FACILITY
5,500,000
5,500,000
68819
GO#50: CAMERAS- BUSINESS DIST.
825,000
825,000
68919
GO#52: LED LIGHTING IN PARKS
3,741,000
3,741,000
69019
GO#55: STREET LIGHTING IMPROVEMENTS
3,500,000
3,500,000
69119
GO#56: CAMERAS- BEACHWALK
700,000
700,000
Fund Total:
36,406,000 - -
- 36A"AN
age 1U90 ot 1657
-71
I BEAC'
PROJECT PROJECT NAME
ATTACHMENT A
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
Previous Years FY 2021 FY 2073 FY 2024 FY 2035 FY 2026 Futuro Total
27319
GO#31: OCEAN DRIVE CORRIDOR
2,000,000
2,000,000
27419
GO#32: PALM & HIBISCUS LANDSCAPING
1,000,000
1,000,000
27719
GO#36: WASHINGTON AVE. CORRIDOR
1,000,000
1,000,000
27819
GO#38: STREET PAVEMENT
5,800,000
5,800,000
27919
GO#39: SEAWALLS & SHORELINES
5,000,000
5,000,000
28019
GO#40: 41 ST. CORRIDOR
1,500,000
1,500,000
68219
GO#33: STREET TREE MASTER PLAN
2,500,000
2,500,000
68419
GO#42: TRAFFIC CALMING
1,500,000
1,500,000
68619
GO#43: BIKE LANES & SHARED USE PATH
2,500,000
2,500,000
410 BUILDING
26990
Fund Total:
CAPITAL FUND
SECOND FL. RENOVATION -BUILDING DEPT
28,MA00
1,240,000
28,000,000
1,240,000
-
Fund Total:_
1,240A00
1,240A40
20607
11TH STREET -FLAMINGO NEIGHBORHOOD
40,468
-
40,468
20619
WASTE WATER STATIONS REHABILITATION
-
2,870,733
2,339,267
5,210,000
23000
SUNSET HARBOUR PUMPSTATION UPGRADES
1,013,016
-
-
1,013,016
23360
WEST AVE/BAY RD NEIGH.
376,706
376,706
27370
541N DIAMETER REDUNDANT SEWER FORCE
2,370,395
-
2,370,395
28120
WATER PUMP STATIONS IMPROVEMENTS
1,000,000
2,595,937
2,115,063
5,71 1,000
28220
WASTEWATER MANHOLE REHABILITATION
3,045,000
1,592,000
-
4,637,000
28320
SEWER PUMP STATION ODOR CONTROL
850,600
850,600
28420
SWR PUMP STATION # 18 IMPROVEMENTS
1,400,000
-
-
1,400,000
28520
WATER & WASTEWATER MAINS AND REHAB
140,889
7,833,710
6,381,290
14,355,889
60319
WATER METER REPLACEMENT PROGRAM
9,104,893
-
9,104,893
60419
DERM & EPA CONSENT DECREE
1,400,000
500,000
2,800,000 2,800,000 2,800,000 2,800,000
13,100,000
64923
PW WHS & SHOPS LED LIGHTS RETROFIT
-
74,000 - -
74,000
65421 VALVE REPLACEMENT PROGRAM 1,029,000 1,029,000
66818 WATER STATION ROOF REPLACEMENT 30,000 - - 30,000
Fund Total:: 20,093,142 16,706,379 13,709,621 2,800,000 2,800,= 2,800,000 59,809,142
Page 1 U91 o
1� 4 � ", V'
', I tR-.s E A C., H
PROJECT PROJECT NAME
ATTACHMENT A
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
Previous Years FY 2022 FY 2023 FY 2024 FY 2025 FY 2036 Future Total
419 2017
20527
WATER & SEWER BONDS
MOT UTILITIES RELOCATION
677,529
677,529
20597
WEST AVENUE PHASE II
18,333,671
18,333,671
20607
11TH STREET -FLAMINGO NEIGHBORHOOD
2,495,457
2,495,457
20619
WASTE WATER STATIONS REHABILITATION
11,103,400
11,103,400
20719
SCADA AND PLC SYSTEMS
3,137,750
3,137,750
21270
VENETIAN NEIGH. -ISLANDS
597,022
597,022
23000
SUNSET HARBOUR PUMPSTATION UPGRADES
539,631
539,631
23220
NORTH SHORE NEIGH. IMPROVEMENTS
138,427
138,427
23240
LA GORCE NEIGHBORHOOD IMPROVEMENTS
297,347
297,347
23360
WEST AVE/BAY RD NEIGH.
110,000
110,000
23380
PALM & HIBISCUS ISLAND ENHANCEMENT
3,963,099
3,963,099
27370
541N DIAMETER REDUNDANT SEWER FORCE
3,997,327
3,997,327
28120
WATER PUMP STATIONS IMPROVEMENTS
4,595,000
4,595,000
28520
WATER & WASTEWATER MAINS AND REHAB
26,276,820
26,276,820
28940
BAYSHORE NEIGH. CENTRAL. SOUTH
3,616,516
3,616,516
60319
WATER METER REPLACEMENT PROGRAM
7,000,000
7,000,000
65421
VALVE REPLACEMENT PROGRAM
931,635 830,853
1,762,488
420 W&S
20527
Fund Total:
GEL SERIES 20102009-27243
FDOT UTILITIES RELOCATION
87,81OA31 830,853 -
178,825
- - - 88164101"
178,825
21270
VENETIANNEIGH. -ISLANDS
2,766,100
2,766,100
22050
BAYSHORE NEIGH. BID PACK A
3,895,513
3,895,513
23000
SUNSET HARBOUR PUMPSTATION UPGRADES
2,500,062
2,500,062
23180
BAYSHORE NEIGH. BID PACK D
2,850,793
2,850,793
23220
NORTH SHORE NEIGH. IMPROVEMENTS
2,368,323
2,368,323
23360
WEST AVE/BAY RD NEIGH.
1,632,360
1,632,360
23380
PALM & HIBISCUS ISLAND ENHANCEMENT
2,547,712
2,547,712
27370
541N DIAMETER REDUNDANT SEWER FORCE
566
566
Fund Total:
18,740,254 - - -
- - - 18,740,254
Page 1092 of 1657
PROJECT PROJECT NAME
UTILITIES
ATTACHMENT A
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
Previous Years FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 Future Total
1 915 nn0 - 1,215,000
23180
BAYSHORE NEIGH. BID PACK D
97,000
97,000
423 GULF
21270
Fund Total:
BREEZE •,.
VENETIAN NEIGH -ISLANDS
97,000 1,213,000 -
1,134,463
- - 1,312,000
1,134,463
22050
BAYSHORE NEIGH. BID PACK A
765,052
765,052
23240
LA GORCE NEIGHBORHOOD IMPROVEMENTS
56,000
56,000
23380
PALM & HIBISCUS ISLAND ENHANCEMENT
2,828,927
2,828,927
28940
BAYSHORE NEIGH. CENTRAL - SOUTH
106,792
106,792
23380
Fund Total:.
4,!91,234
4,11191,1134
22050
BAYSHORE NEIGH. BID PACK A
2,893,609
2,893,609
23180
BAYSHORE NEIGH. BID PACK D
777,897
777,897
23220
NORTH SHORE NEIGH. IMPROVEMENTS
2,024,350
2,024,350
23240
LA GORCE NEIGHBORHOOD IMPROVEMENTS
524,662
524,662
23300
FLAMINGO NEIGHBORHOOD -SOUTH
1,211,126
1,211,126
23360
WEST AVE/BAY RD NEIGH.
1,063,111
1,063,111
23380
PALM & HIBISCUS ISLAND ENHANCEMENT
1,222,509
1,222,509
27370
541N DIAMETER REDUNDANT SEWER FORCE
78,434
78,434
28940
BAYSHORE NEIGH. CENTRAL- SOUTH
1,715
1,715
425 WATER
21270
Fund Total:
AND SEWER ENTERPRISE FUN
VENETIAN NEIGH. -ISLANDS
131437,154 - - -
1,529,777
- - 13,437,154
1,529,777
22050
BAYSHORE NEIGH. BID PACK A
50,770
50,770
23180
BAYSHORE NEIGH. BID PACK D
358,785
358,785
23360
WEST AVE/BAY RD NEIGH.
106,783
106,783
23380
PALM & HIBISCUS ISLAND ENHANCEMENT
503,278
503,278
28940
BAYSHORE NEIGH. CENTRAL- SOUTH
309,433
309,433
64220
PUBLIC WORKS FACILITY EXTERIOR
84,914
84,914
69220
PUBLIC WORKS FACILITY GENERATOR
130,209
130,209
Fund Total:
3A73,949 - -
- - 3,073,949
Page 1o
i 11— F"
A -.n A H
PROJECT PROJECT NAME
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
Previous Years FY 2022 FY 2023 FY 2024 FY 2025 FY 2026
ATTACHMENT A
Futuro Total
427 STORMWATER
21270
ENTERPRISE FUND
VENETIAN NEIGH. -ISLANDS
2,600,270
2,600,270
23000
SUNSET HARBOUR PUMPSTATION UPGRADES
1,974,840
1,974,840
23380
PALM & HIBISCUS ISLAND ENHANCEMENT
449,272
449,272
27170
SEAWALL-BISCAYNE BAY ST END PH. II
1,508,344
1,508,344
28940
BAYSHORE NEIGH. CENTRAL - SOUTH
75,486
75,486
69220
PUBLIC WORKS FACILITY GENERATOR
65,105
65,105
428 STORMWATER
21270
Fund Total:
BONDS •••
VENETIAN NEIGH. -ISLANDS
6,673,317 - -
4,353,561
- - 6,673,317
4,353,561
22050
BAYSHORE NEIGH. BID PACK A
1,549,281
1,549,281
23180
BAYSHORE NEIGH. BID PACK D
119,601
119,601
23240
LA GORCE NEIGHBORHOOD IMPROVEMENTS
730,899
730,899
23270
CITY CENTER COMMERCIAL DISTRICT BPB
(28,330)
)28,330)
23300
FLAMINGO NEIGHBORHOOD -SOUTH
3,375,123
3,375,123
23360
WEST AVE/BAY RD NEIGH.
1,260,981
1,260,981
23380
PALM & HIBISCUS ISLAND ENHANCEMENT
427,465
427,465
429 2017
20587
Fund Total:
STORMWATERBONDS
1 ST STREET-ALTON RD TO WASHINGTON
11,788,581 - -
17,459,326
- 11,788,581
17,459,326
20597
WEST AVENUE PHASE II
57,041,515
57,041,515
20607
11TH STREET -FLAMINGO NEIGHBORHOOD
1,942,680
1,942,680
20719
SCADA AND PLC SYSTEMS
4,100,250
4,100,250
21220
INDIAN CREEK STREET DRAINAGE IMP.
5,267,542
5,267,542
23000
SUNSET HARBOUR PUMPSTATION UPGRADES
3,750,973
3,750,973
23180
BAYSHORE NEIGH. BID PACK D
2,343,000
2,343,000
23270
CITY CENTER COMMERCIAL DISTRICT BPB
2,300,000
2,300,000
23360
WEST AVE/BAY RD NEIGH.
515,356
515,356
23380
PALM & HIBISCUS ISLAND ENHANCEMENT
5,699,315
5,699,315
25750
WEST AVE BRIDGE OVER COLLINS CANAL
283,380
283,380
28920
BIOSWALE PILOT PROJECT
850,000
850,000
28940
BAYSHORE NEIGH. CENTRAL - SOUTH
1,065,000
1,065,000
Fund Total:
102,618,337 - -
- - 102,616,337
Page 1094 ot 1657
PROJECT PROJECT NAME
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
Previous Years FY 1072 FY 2023 FY 2024 FY 2025 FY 2026
ATTACHMENT A
Future Total
431 2011
21270
STORMWATER
VENETIAN NEIGH. -ISLANDS
2,592,290
2,592,490
22050
BAYSHORE NEIGH. BID PACK A
10,632,774
10,632,774
23000
SUNSET HARBOUR PUMPSTATION UPGRADES
3,552,816
3,552,816
23180
BAYSHORE NEIGH. BID PACK D
2,606,560
2,606,560
23240
LA GORCE NEIGHBORHOOD IMPROVEMENTS
2,039
2,039
23270
CITY CENTER COMMERCIAL DISTRICT BPB
132,000
132,000
23300
FLAMINGO NEIGHBORHOODSOUTH
205,800
205,800
23360
WEST AVE/BAY RD NEIGH.
5,854,876
5,854,876
23380
PALM & HIBISCUS ISLAND ENHANCEMENT
1,535,601
1,535,601
28940
BAYSHORE NEIGH. CENTRAL - SOUTH
104,420
104,420
432 STORMWATER
21270
Fund Total:
BONDS
VENETIAN NEIGH -ISLANDS
27,219,376 - -
20,516,285
- - 27,219,376
20,516,285
22050
BAYSHORE NEIGH. BID PACK A
590,216
590,216
23000
SUNSET HARBOUR PUMPSTATION UPGRADES
12,962,851
12,962,851
23180
BAYSHORE NEIGH. BID PACK D
4,177,000
4,177,000
23270
CITY CENTER COMMERCIAL DISTRICT BPB
5,856,402
5,856,402
23360
WEST AVE/BAY RD NEIGH.
4,433,928
4,433,928
23380
PALM & HIBISCUS ISLAND ENHANCEMENT
22,578,586
22,578,586
27370
54IN DIAMETER REDUNDANT SEWER FORCE
3,607,765
3,607,765
28940
BAYSHORE NEIGH. CENTRAL -SOUTH
11,686,706
11,686,706
STORMWATER
20422
Fund Total:
PROJECTS433
FLAMINGO NEIGHBORHOOD
36,409,739 - - -
300,000
- - - 36A09,739
300,000
20597
WEST AVENUE PHASE II
1,787,000
1,787,000
21220
INDIAN CREEK STREET DRAINAGE IMP.
8,957,255
8,957,255
23180
BAYSHORE NEIGH. BID PACK D
1,200,000
1,200,000
23220
NORTH SHORE NEIGH. IMPROVEMENTS
450,000
450,000
23380
PALM & HIBISCUS ISLAND ENHANCEMENT
2,690,176
2,690,176
24020
ORCHARD PARK
250,000
250,000
28300
SHANE WATERSPORT SEAWALL
650,000
650,000
Page 1095 of 1657
1, N
11 --
�Ihyr�'r%Ili � ,'���. � yY + I� I F.-ur" * �A wd
PROJECT PROJECT NAME
ATTACHMENT A
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
Previous Years FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 Future Total
29020 CITYWIDE SEAWALL REHAB 10,000,000 10,000,000
Fund Total: 26,284A31 - - - 26,2"A31
21220
INDIAN CREEK STREET DRAINAGE IMP.
zae,400 - - -
- - - -------
-21720
21720
DRAINAGE SYSTEM WATER QUALITY PILOT
500,000
500,000
23270
CIN CENTER COMMERCIAL DISTRICT BPB
628,603
628,603
23360
WEST AVE/BAY RD NEIGH.
401,046
401,046
29820
STORM WATER OUTFALLS
2,000,000
2,000,000
435 SANITATION
21920
ENTERPRISE FUND
RECONFIGURATION OF SANITATION AREA
Fund Total:
3,762,107 -
330,000
3,762,107
330,000
63718
SANITATION INTERIOR REPLACEMENT
190,000
190,000
64318
BAYSHORE GREEN WASTE FACILITY
750,000
750,000
69470
FLEET/SANITATION FIRE ALARM SYSTEM
42,900
42,900
MIAMI-DADE
28160
COUNTY439
CONVENTION CENTER RENOVATION
Fund Total:
1,312,900 - -
54,426,432
1,312.900
54,426,432
. CONVENTION
21618
Fund Total:
CENTER OPERATIONS
CONVENTION CENTER GARAGE EQUIPMENT
54A26A32 -
121,000
- - 54A26A32
121,000
28160
CONVENTION CENTER RENOVATION
1,557,174
1,557,174
28170
CONVENTION CENTER PARK
1,712,000
1,712,000
CONVENTION441
28160
DEVELOPMENT
CONVENTION CENTER RENOVATION
Fund Total:
3,390,174 - -
19,921
- - 3,390,174
19,921
CONVENTION
28160
DEVELOPMENT442
CONVENTION CENTER RENOVATION
Fund Total:
19,921
2,457,531
2,4577531
Fund Total:'
2A57,531 -
- 2A37,531
65023 CONV.CTR. EXHIBIT HALLS FIRE STROBE 300,000 300,000
65122 CONV.CTR. ADDITIONAL SECURITY CAMERAS - 250,000 250,000
age 1096 of 1657
t `[11,�{, r : ~ 1� 7 �`�'v'� k I Y..�� Ems». ,( ..� ,,.,✓
PROJECT PROJECT NAME
ATTACHMENT A
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
Previous Years FY 2022 FY 2023 FY 2024 FY 2025 FY 2016 Futuro Total
65123
CONV.CTR. VIBRATION ISOLATORS
100,000
100,000
65223
CONVENTION CTR. EXHIBIT HALL LIGHTS
-
60,000
60,000
67322
PARKING DECK CRACKS REPAIR
280,000
280,000
67422
EAST CHILLED WATER PIPING INSULATION
35,000
35,000
67522
CANAL PARK LANDSCAPING REPLACEMENT
40,000
40,000
67622
TERRAZZO FLOOR SCRUBBERS
40,000
40,000
67722
ENERGY CONSUMPTION MANAGEMENT INTEGRATION
SYSTEM
35,000
35,000
67822
CHILLER LINES FLUSHING
25,000
25,000
463 RDA -_GARAGE
20022
Fund Total:
FUND
16TH ST. GARAGE -JOINT REPLACEMENT
889A00
200,000
460000 -
1,340A00
200,000
20200
TRANSPORTATION CAPITAL INITIATIVE
7,000,000
-
7,000,000
21124
16TH ST GARAGE -EXTERIOR RENEWAL
400,000
400,000
28010
COLLINS PARK PARKING GARAGE
2,069,000
- -
2,069,000
60023
16TH ST GARAGE -PLUMBING SYSTEM UPDATE
-
75,000
75,000
60190
ANCHOR GARAGE ELEVATOR REPLACEMENT
357,995
-
357,995
60324
16TH STREET GARAGE -GENERATOR
-
250,000
250,000
61718
16TH STREET GARAGE FIRE SPRINKLER
1,444,000
1,444,000
61818
16TH STREET GARAGE STAIRWAYS
101,200
101,200
61918
16TH STREET GARAGE ROOF AND DECK
1,808,000
1,808,000
62422
16TH STREET GARAGE HVAC RENEWAL
-
34,000
34,000
62721
16TH STREET GARAGE-OFFICE/RESTROOM
30,000
30,000
62821
16TH STREET GARAGE -ROOF TOP RENEWAL
34,000
34,000
65019
16TH STREET GARAGE (ANCHOR) - PAINT
100,000
100,000
65521
16TH STREET CANVAS AWNING RENEWAL
56,560
56,560
66918
ANCHOR GAR. -FIRE ALARM REPLACEMENT
221,000
221,000
67018
ANCHOR GARAGE -STAIRWELL DOORS
27,000
27,000
67118
ANCHOR - INTERIOR FLOOR DRAINAGE
30,000
-
30,000
67922
16TH STREET GARAGE -EXTERIOR PAINT RENEWAL &
WATERPROOFING
-
550,000
550,000
- - - -
Fund Total:
13,214,755-
848,000
75,000 650000 -
- 14,787,753
Page 1097 of 1657
;.1 A I P E All,
PROJECT PROJECT NAME
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
Previous Years FY 2021 FY 2023 FY 2024 FY 2025 FY 2036
ATTACHMENT A
Future
Total
Fund Total: 6,000,009 - - 6AOOA00
20025
PENN GARAGE -ELEVATOR RENEWAL
250,000
218,000
26290
17TH ST. PARKING GARAGE MAINTENANCE
JUV,VVV
/ i o,vvv
26100
GARAGE SECURITY CAMERA SYSTEM
20,000
-
27480
SURFACE LOT P48 BASS MUSEUM LOT
-
20,000
60025
PENN GARAGE•ROOFTORSTAIRS ELEVATOR
-
30,000
28080
-
40,000
40,000
60424
PENN GARAGE -GENERATOR RENEWAL
38,000
38,000
60130
200.000
46,580
200,000
60524
PENN GARAGE -PLUMBING SYSTEM UPDATE
325,300
325,300
61930
75,000
876,000
75,000
60823
PENN GARAGE -FIRE SPRINKLER RENEWAL
240,000
240,000
300,000
-
200,000
300,000
60923
PENN GARAGE -FIRE PUMP REPLACEMENT
51,087
51,087
100,000
age 1098 ot 165T
100,000
61023
PENN GARAGE -FIRE ALARM SYSTEM
-
35,000
-
35,000
63021
PENN GARAGE -HVAC RENEWAL
85,000
-
35,000
120,000
63121
PENN GARAGE -TRAFFIC COATING -RETAIL
100,000
-
1 D0,000
64319
PENN GARAGE - NEW LIGHTING DISPLAY
135,000
-
135,000
67218
PENN GARAGE -SEALING OF SUPERSTRUCTURE
25,000
25,000
67318
PENN GARAGE-INT.SURFACE RESTORATION
95,000
95,000
Fund Total:
'179,000403,000
139,000
479,000
S79A09
1,96OA00
CURB RAMP INSTALLATION 20,000
26100
GARAGE SECURITY CAMERA SYSTEM
250,000
250,000
26290
17TH ST. PARKING GARAGE MAINTENANCE
100,000
100,000
26340
PENRODS AT 1 OCEAN DR. PARKING LOT
52,137
52,137
27480
SURFACE LOT P48 BASS MUSEUM LOT
220,000
220,000
27830
PARKING GARAGE AT 1262 COLLINS AVE
30,000
30,000
28080
INTELLIGENT TRANSPORT SYSTEM
2,500,000
2,500,000
28710
P14 6TH ST & COLLINS PARKING LOT
38,000
38,000
60130
13TH ST GARAGE FIRE ALARM
46,580
46,580
61660
13TH STREET PARKING GARAGE ELEVATOR
325,300
325,300
61930
17TH STREET PARKING GARAGE ELEVATOR
876,000
876,000
62100
42ND ST. PARKING GARAGE MAINTENANCE
240,000
240,000
62940
CITYWIDE PARKING LOT LIGHTING
200,000
200,000
69370
42ND ST. GARAGE FIRE ALARM SYSTEM
51,087
51,087
age 1098 ot 165T
,� Vi. " "AJNA I B E A C,� H
PROJECT PROJECT NAIVE
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
Previous Years FY 1022 FT 2073 FY 1024 FY 2025 FY 2026
ATTACHMENT A
Futuro Total
69380 42ND ST GARAGE ELEVATOR REPLACEMENT 565,145 565,145
Fund Total: 3;314,249 - - 3,314,249
22020
GARAGE -LICENSE PLATE RECOGNITION
463,205 - -
- K+�
26100
GARAGE SECURITY CAMERA SYSTEM
1,000,000
1,000,000
26290
17TH ST. PARKING GARAGE MAINTENANCE
135,000
135,000
28710
P14 6TH ST & COLLINS PARKING LOT
303,ODO
303,000
29580
LOT 91) P866976 INDIAN CREEK DRIVE
468,000
468,000
60119
17TH STREET PARKING GARAGE COATING
1,400,000
1,400,000
60120
13TH STREET PARKING GARAGE COATING
800,000
800,E
61217
13TH ST. GARAGE-WINDOW/GLASS BLOCK
35,350
35,350
61623
SUNSET HARBOUR GARAGE -FIRE ALARM
35,000
35,000
61717
42ND ST. GARAGESOYR CERTIFICATION
312,090
312,090
62418
12TH STREET GARAGE ROOF AND DECK
299,806
299,806
62518
1755 MERIDIAN GARAGE ROOF AND DECK
500,000
500,000
62522
13TH STREET GARAGE NEON RENEWAL
- 67,000
67,000
63321
13TH STREET GARAGE-40YR CERT.
300,000 -
300,000
64018
17TH ST GARAGE 40YR RECERTIFICATION
484,833
484,833
65621
42ND STREET GARAGE FALL PROTECTION
151,500
151,500
488 PARKING
21618
Fund Tatal:
REV BONDS
CONVENTION CENTER GARAGE EQUIPMENT
.' '' 6;b877E4 67;000 -
185,260
6,734,704
185,260
28160
CONVENTION CENTER RENOVATION
64,811,756
64,811,756
PARKING
20125
Fund Totah
CAPITAL NOT
BONDS490
1755 MERIDIAN GARAGE ELEVATOR
64,997,016 - - -
- 500,000
- 64,997,016
500,000
20225
SUNSET HARBOUR GARAGE ELEVATOR
500,000 -
500,000
20325
SUNSET HARBOUR GARAGE -ROOFTOP
300,000
300,000
20823
1755 MERIDIAN GARAGE FIRE SPRINKLER
300,000
300,000
20923
SUNSET HARBOUR GARAGE SPRINKLER
300,000
300,000
21224
1755 GARAGE GENERATOR
- 200,000
200,000
21324
SUNSET HARBOUR GARAGE GENERATOR
200,000
200,000
21618
CONVENTION CENTER GARAGE EQUIPMENT
464,740 -
464,740
Page 1099 of 1657
� 'y \ 'It --l' / v � I B E AC H
PROJECT PROJECT NAME
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
Previous Years FY 2022 FY 2033 FY 2024 FY 2025 FY 2026
ATTACHMENT A
Future Total
21718
BISCAYNE BEACH ADDITIONAL PARKING
250,000
250,000
22020
GARAGE -LICENSE PLATE RECOGNITION
391,795
391,795
22120
12TH ST GARAGE -ELEVATOR REPLACEMENT
174,450
174,450
22122
SUNSET HARBOUR GARAGE SCREENING
200,000
200,000
22150
72 ST. COMMUNITY COMPLEX
10,471,704
-
10,471,704
22220
17TH ST. GARAGE -ELECTRICAL FEEDER
-
225,000
225,000
26100
GARAGE SECURITY CAMERA SYSTEM
89,472
-
89,472
26340
PENRODS AT 1 OCEAN DR. PARKING LOT
103,666
-
103,666
60125
1755 MERIDIAN GARAGE OFFICE ROOF
-
300,000
300,000
60225
SUNSET HARBOUR GARAGE INT. FLOOR
-
34,000
34,000
60317
CITYWIDE PARKING LOTS IMPROVEMENTS
150,000
150,000 150,000 150,000
600,000
60522
12TH ST GARAGE- INT. FLOOR DRAINAGE
25,000
- -
25,000
60622
13TH ST. GARAGE -PARKING SIGN RENEWAL
30,000
30,000
60624
17TH STREET GARAGE -EXTERIOR COATING
-
300,000
300,000
60722
42 ST GARAGE -STAIRWELL WATERPROOFING
50,000
-
50,000
60724
42ND STREET GARAGE -FIRE SPRINKLER
-
40,000
40,000
60822
1755 MERIDIAN GARAGE LED LIGHTING
150,000
150,000
60922
SUNSET HARBOUR GARAGE SEALING
75,000
75,000
61022
SUNSET HARBOUR GARAGE -TRAFFIC COATING
303,000
303,000
61123
12TH ST GARAGE -STAIRWELL DOOR
32,000
32,000
61223
12TH ST. GARAGE -STAIRWELL RAILING
25,000
25,000
61317
13TH ST. GARAGE -STAIRWELL RAILING
50,000
-
50,000
61323
42ND ST GARAGE -PLUMBING SYSTEM UPDATE
-
75,000
75,000
61417
17TH ST GARAGE INT. FLOOR DRAINAGE
30,000
-
30,000
61423
1755 GARAGE FIRE PUMP REPLACEMENT
-
100,000
100,000
61517
17 ST GARAGE -STORAGE SPACE RENOVATION
100,000
100,000
61523
SUNSET HARBOUR GARAGE FIRE PUMP
-
100,000
100,000
61617
17TH ST GARAGE -PLUMBING SYSTEM UPDATE
-
75,000
75,000
61817
42ND ST. GARAGESTAIRWELL RAILING
25,000
-
25,000
61917
1755 MERIDIAN GARAGE FLOOR DRAINAGE
200,000
200,000
-- -62017 - SUNSET HARBOUR GARAGE LED LIGHTING 300,000 = 300,000
62100 42ND ST. PARKING GARAGE MAINTENANCE 160,000 160,000
62118 12TH STREET PARKING LIGHTING (LED) 64,000 64,000
age 11 DO of 1651
�, gl� I ; r^� - \C H
/ IV � I'll �A.,�'\A I b E -,le -
PROJECT PROJECT NAME
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
Previous Years FY 2022 FY 2023 FY 2024 FY 2025 FY 2026
ATTACHMENT A
Future Total
62218
13TH STREET GARAGE LIGHTING )LED)
86,000 -
86,000
62223
12TH STREET OVERHEAD GATE RENEWAL
- 61,100
61,100
62940
CITYWIDE PARKING LOT LIGHTING
250,000 - -
250,000
63221
12TH STREET GARAGE -DOMESTIC WATER
- 79,000
79,000
64018
17TH ST GARAGE 40YR RECERTIFICATION
270,594 -
270,594
64419
13TH STREET GARAGE - WATER SYSTEM
33,000
33,000
64519
17TH STREET GARAGE - 1 ST FL OFFICE
45,000
45,000
64619
SURFACE LOTS CITYWIDE LANDSCAPING
100,000
100,000
66121
12 ST. PARKING GARAGE FIRE ALARM
50,000
50,000
67418
42ND STREET GARAGE -DISPATCH AREA
100,000
100,000
67518
1755 MERIDIAN AVE OFFICE SECURITY
35,000
35,000
67618
12TH STREET GARAGE -ROOF RENEWAL
64,000
64,000
67818
17 ST GARAGE -GENERATOR REPLACEMENT
120,000
120,000
68018
42ND STREET GARAGE -GENERATOR
96,550
96,550
68022
SKIDATA GARAGE SOFTWARE UPGRADE
- 475,000
475,000
68118
42ND ST GARAGE- INTERIOR DRAINAGE
34,000 -
34,000
Fund Total:
i 13AS3,971. 2,164,000 1,521,100 890,000 1,284,000 500,000
- 19,8113,071
FY26 VEHICLE/EQUIPMENT REPLACEMENT 5,107,
60417
FY20 VEHICLE/EQUIPMENT REPLACEMENT
7,468,000 -
7,468,000
60425
FY25 VEHICLE/EQUIPMENT REPLACEMENT
4,938,000
4,938,000
61122
FY22 VEHICLE/EQUIPMENT REPLACEMENT
7,414,000 -
7,414,000
61424
FY24 VEHICLE/EQUIPMENT REPLACEMENT
- 6,806,000
6,806,000
61723
FY23VEHICLE/EQUIPMENT REPLACEMENT
8,136,000 -
8,138,000
63421
FY21 VEHICLE/EQUIPMENT REPLACEMENT
9,968,000
9,968,000
63922
FLEET BAYS PLUMBING RENEWAL
- 141,000
141,000
65119
FYI VEHICLE/EQUIPMENT REPLACEMENT
3,030,000
3,030,000
65618
FLEET MANAGEMENT STAIRS RESTORATION
- 35,000
35,000
65718
FLEET MANAGEMENT WAREHOUSE CEILING
30,000
30,000
65918
FLEET MANAGEMENT LED LIGHTING
75,000
75,000
66118 --FLEET MANAGEMENT BAYS PAINTING - - - m_ - -120,000 - - = 120,000
68122 FLEET 40 YEAR RE -CERTIFICATION 35,000 35,000
68222 FLEET ENHANCEMENTS PHASE II UPGRADE - 150,000 150,000
Page 1101 ot 1557
��N,AA! BEACH
PROJECT PROJECT NAME
ATTACHMENT A
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
Previous Years FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 Futuro Total
68322
FLEET SECURITY CAMERAS
3,9UU,000
3,900,000
157,000
157,000
68422
FLEET WAREHOUSE WATERPROOFING AND ROOF REPAIR
20,000,000
145,000
145,000
68522
FLEET GATE
-
23,000,000
51,000
51,000
68622
FLEET PARKING LOT RESURFACING
20,000,000
-
71,000
71,000
69470
FLEET/SANITATION FIRE ALARM SYSTEM
27819
42,900
-
42,900
520 PROPERTY
21818
MANAGEMENT FUND
PROPERTY MGMT FACILITY GENERATOR
Fund Total:
40,308,900
250,000
8,023A00 8,539,000 6,806,000 4,9UA00 5,107,000
- .921,900
250,000
. COMMUNICATIONS
22018
FUND
FIBER COMMUNICATIONS INSTALLATION
Fund Total:
250,000
292,000
- -
- 250,000
292,000
23119
GO#49: PUBLIC SAFETY RADIO SYSTEM
14,000,000
667,718
28219
667,718
68450
BLDG DEV PROCESS ENT SYSTEM
8,000,000
1,600,000
GO#33: STREET TREE MASTER PLAN
1,600,000
552 INFO &
COMMUNICATIONS TECH
Fund Total-
2,359,718
- - - - -
- 2,559,718
61790
MBPD OFF-DUTY EMPLOYMENT SOFTWARE
GO#43: BIKE LANES & SHARED USE PATH
60,000
1
60,000
68450
BLDG DEV PROCESS ENT SYSTEM
9010,000 -
58,468
168A 1)00
58,468
Page 1102 o
Fund Total:
118,{68
- -
- 118,468
24619
GO#37: SIDEWALK IMPROVEMENTS
3,9UU,000
3,900,000
7,800,000
27319
GO#31: OCEAN DRIVE CORRIDOR
18,000,000
20,000,000
38,000,000
27519
GO#34: ABOVE GROUND IMPROVEMENTS
23,000,000
-
23,000,000
27619
GO#35: FLAMINGO PARK NEIGHBORHOOD
20,000,000
20,000,000
27719
GO#36: WASHINGTON AVE. CORRIDOR
9,000,000
-
9,000,000
27819
GO#38: STREET PAVEMENT
12,100,000
12,100,000
24,200,000
27919
GO#39: SEAWALLS & SHORELINES
5,000,000
-
5,000,000
28019
GO#40: 41 ST. CORRIDOR
13,500,000
-
13,500,000
28119
GO#41: LA GORCE NEIGHBORHOOD
14,000,000
14,000,000
28219
GO#44: NORTH SHORE NEIGHBORHOOD
8,000,000
8,000,000
68219
GO#33: STREET TREE MASTER PLAN
2,500,000
2,500,000
68419
GO#42: TRAFFIC CALMING
500,000
500,000
68619
GO#43: BIKE LANES & SHARED USE PATH
2,500,000
2,500,000
Fund Total: -
9010,000 -
78,000,000
168A 1)00
Page 1102 o
.j 1.11 11, 1 t-111.1 " � I Iq ,
PROJECT PROJECT NAME
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
Previous Years FY 2022 FY 2073 FY 2024 FY 2025 FY 2026
ATTACHMENT A
Futuro Total
• P.SAFE
28319
FUTURE GO BONDS
GO#45: FIRE STATION #1
6,000,000
6,000,000
28419
GO#46: OCEAN RESCUE NOBE FACILITY
4,000,000
4,000,000
28619
GO#51: FIRE STATION #3
10,000,000
10,000,000
28719
GO#53: SECURITY FOR PUBLIC SPACES
2,350,000
2,350,000
28819
GO#54: MARINE PATROL FACILITY
700,000
700.E
68519
GO#48: POLICE HQ FACILITY
4,500,000
4,500,000
68919
GO#52: LED LIGHTING IN PARKS
759.000
759,000
69019
GO#55: STREET LIGHTING IMPROVEMENTS
6,500,000
6,500,000
1,076,000
Fund Total:
- 34,609;000
34.609.000
25419
GO#5: FLAMINGO PARK & YOUTH CENTER
15,150,000
15,150,000
25519
GO#6: FISHER PARK
105,000
105,000
25619
GO#7: LA GORCE PARK
150,000
150,000
26019
GO#11: MUSS PARK
250,000
250,000
26219
GO#13: N.SHORE PARK & YOUTH CENTER
2,185,000
2,185,000
26719
GO#23: BAYWALK PEDESTRIAN BRIDGE
5,000,000
5,000,000
26919
GO#27: LOG CABIN
1,076,000
1,076,000
27019
GO#28: ART DECO MUSEUM
2,000,000
2,000,000
27119
GO#29: WEST LOTS
4,000,000
4,000,000
67519
GO#14: PALM ISLAND PARK
231,000
231,000
67619
GO#16: PINETREE PARK
700,000
700,000
67719
GO#20: SOUTH POINTE PARK
480,000
480,000
67919
GO#22: TATUM PARK
840,000
840,000
68019
GO#25: WATERWAY RESTORATION
6,000,000
6,000,000
FSW FUTURE
20124
Fund Total: -
STORMWATER
ALLISON ISLAND NORTH
- 61,167,000
6,154,321
61,167,000.
6,154,321
20224
NORMANDY SHORES
29,147,027
29,147,027
---- 20323
LA GORCE ISLAND
9,104,921
9,104,921
20324
BELLE ISLE
4,550,621
4,550,621
20422
FLAMINGO NEIGHBORHOOD
120,000,000
120,000,000
age 1103 ot 165f
1� j i A k, -H
I 'A. 1 ?�� B' E A -
PROJECT PROJECT NAME
ATTACHMENT A
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
Previous Years FY 2022 FY 2023 FY 2024 FY 2055 FY 2026 Future Total
20424
BISCAYNE BEACH
20,445,421
20,445,421
20522
NAUTILUS NEIGHBORHOOD
29,486,421
29,486,421
20524
BISCAYNE POINT
13,266,321
13,266,321
20624
CENTRAL BAYSHORE
7,963,400
7,963,400
20724
INDIAN CREEK PARKWAY
9,217.121
9,217.121
20824
PARK VIEW ISLAND
4,759,121
4,759,121
20922
NORMANDY ISLES DRAINAGE IMPROVEMENT
164,000,000 -
164,000,000
20924
STAR ISLAND
- 6,032,621
6,032,621
21122
SUNSET ISLAND 1
5,319,421
5,319,421
21222
SUNSET ISLAND 2
7,446,121
7,446,121
22320
LAKEVIEW NEIGHBORHOOD IMPROVEMENTS
25,600,000
25,600,000
22418
MT. SINAI STORMWATER PUMP STATION
13,227,421
13,227,421
22720
PUBLIC WORKS FACILITY -PUMP STATION
2,300,000
2,300,000
23220
NORTH SHORE NEIGH. IMPROVEMENTS
40,627,421
40,627,421
23240
LA GORCE NEIGHBORHOOD IMPROVEMENTS
40,000,000
40,000,000
23270
CITY CENTER COMMERCIAL DISTRICT BPB
40,227,421
40,227,421
24020
ORCHARD PARK
13,688,421
13,688,421
24120
TOWN CENTER
45,544,504 -
45,544,504
FWS FUTURE
20422
Fund Total:
WATER & SEWER
FLAMINGO NEIGHBORHOOD
45.544,504 _ 164,000;000 - 445.563,342
94,000,000
655,105,046
94,000,000
20527
FDOT UTILITIES RELOCATION
17,000,000
17,000,000
20922
NORMANDY ISLES DRAINAGE IMPROVEMENT
128,000,000 -
128,000,000
22320
LAKEVIEW NEIGHBORHOOD IMPROVEMENTS
- 15,400,000
15,400,000
22418
MT. SINAI STORMWATER PUMP STATION
6,500,000
6,500,000
22720
PUBLIC WORKS FACILITY -PUMP STATION
2,990,000
2,990,000
23220
NORTH SHORE NEIGH. IMPROVEMENTS
19,500,000
19,500,000
23240
LA GORCE NEIGHBORHOOD IMPROVEMENTS
40,000,000
40,000,000
23270
CITY CENTER COMMERCIAL DISTRICT BPB
14,560,000
14,560,000
24120
TOWN CENTER
42,000,000
42,000,000
28220 WASTEWATER MANHOLE REHABILITATION = 1,639,091 1,688,263- 3,327,354
Page 1104 of 1657
PROJECT PROJECT NAME
ATTACHMENT A
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY
Previous Years FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 Future Total
28520 WATER & WASTEWATER MAINS AND REHAB 15,441,872 15,268,653 30,710,525
29310 CONVENTION CNTR LINCOLN RD CONNECTOR 3,400,000 - 3,400,000
Fund Total: - - 62A90,963 33,956,916 1211,000,000 - 192,950A00 417,3117,1179
Grand Total:
Page 1105 of 1657
ATTACHMENT B
}/ CITY OF MIAMI BEACH
A � .I�`-*.'ti,... H FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY PROGRAM
PROJECT PROGRAM Previous Years FY 2022 FY 2073 FY 1024 FY 2025 FY 2026 Future Total
ART IN PUBLIC PLACES
Tomam&cART .
20377 AIPP MB CONVENTION 7,530,797 - 7,530,797
22618 AIPP FIRE STATION 2 95,334 95,334
22718 AIPP FLAMINGO PARK PROJECT 194,000 194,000
22918 AIPP LUMMUS PARK PROJECT 116,000 - 116,000
65922 TOBIAS REHBERGER OBSTINATE LIGHTHOUSE 85,000 85,000
7,936,131 45,000 - - - - - 8,021,131
PW Aw"- , $M1lATION
65519 BRIDGE REPAIRS FY19
60,875
60,875
Rl1D1lIIlRlliSe
22920 CITYWIDE BRIDGES
925,202 750,000 750,000 800,000
3,225,202
25750 WEST AVE BRIDGE OVER COLLINS CANAL
7,145,127 - -
7,145,127
" 8,070,319 750,000 760,000 800,000 -
- 10,370,529
TOMRIBM A. CULTURAL DIPARR11111W .
64160 PAINTING & LIGHTING OF BRIDGES
1,585,000
1,585,000
67140 81ST ST PEDESTRIAN BRIDGE
180,000
180,000
1,763.000 -
- 1.765.000
28180 CONVENTION CENTER - CARL FISHER 3,912,900 3,912,900
13,374,900 - - - - - - 13,374,900
CMCi:` M1;CMG6NT�'DiS1RiCT •-
a
28160 CONVENTION CENTER RENOVATION 615,421,648 615,421,648
PlfRt�i,;IWM�11{►TNaN .:' :... '; -
21618 CONVENTION CENTER GARAGE EQUIPMENT 771,000 771,000
ATTACHMENT B
r^ CITY OF MIAMI BEACH
l!'� �,�� FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY PROGRAM
JBEAC
PROJECT PROGRAM Previous Years FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 Future Total
ENVIRONMENTAL
21018
BAYWALK PHASE 2
-inc,vw
-------
21119
BAYWALK 10TH TO 12TH STREET
310,000
310,000
28070
MIDDLE BEACH REC. CORRIDOR PH III
2,675,000
2,675,000
61920
MAURICE GIBB SOIL REMEDIATION
1,092,000
1,092,000
60020 FLEET MGMT-GENERATOR TRANSFER SWITCH
100,000
4A63 000 - -
- 4A63i000
60057 FIRE STATION 3 EMERGENCY GENERATOR
125,200
62719
FLEET MGMT FACILITY REMEDIATION
111,000
111,000
62819
LAKE PANCOAST MANGROVE LIVING SHORELINE
30,000 1,450,000
1,480,000
65822
MIAMI BEACH MOORING FIELD
- 156,000 310,000
466,000
68019
GO#25: WATERWAY RESTORATION
6,000,000 -
6,000,000
69520
WATERWAY RESTORATION
250,000
250,000
60417 FY20 VEHICLE/EQUIPMENT REPLACEMENT
391A00 156AN 7,450A00 310A00
- 813071000
alma a► tSor 1Yuu�►oe�ltt�lr :: <:: <: .:..
. .
21818 PROPERTY MGMT FACILITY GENERATOR
350,000
350,000
23118 FIRE STATION 4 SECURITY ENHANCEMENT
50,683
50,683
60007 POLICE STATION NEW GENERATOR
555,000
555,000
60020 FLEET MGMT-GENERATOR TRANSFER SWITCH
100,000
100,000
60057 FIRE STATION 3 EMERGENCY GENERATOR
125,200
125,200
65821 FILLMORE ESCALATOR REPAIRS
162,219
162,219
66720 COLONY THEATER -SOUND AND VIDEO
- 107,000
107,000
67920 SMART BUILDING AUTOMATION SYSTEM
-
100,000
100,000
1,343,102
1001m 107,000 - - -
1,350,102
il!!i 1NA1#AQ4M1>fNl . .
60417 FY20 VEHICLE/EQUIPMENT REPLACEMENT
7,468,000
7,468,000
60425 FY25 VEHICLE/EQUIPMENT REPLACEMENT
- 4,938,000
4,938,000
61122 FY22 VEHICLE/EQUIPMENT REPLACEMENT
7,414,000 - -
7,414,000
61424 FY24 VEHICLE/EQUIPMENT REPLACEMENT
- 6,806,000
6,806,000
61723 FY23VEHICLE/EQUIPMENT REPLACEMENT
8,138,000
8,138,000
63421 FY21 VEHICLE/EQUIPMENT REPLACEMENT
9,968,000
9,968,000
Page 1107 of 1657
ATTACHMENT B
CITY OF MIAMI BEACH
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY PROGRAM
a
C 11H
PROJECT PROGRAM Previous Years FY 2033 FY 2023 FY 2024 FY 2025 FY 2026 Futuro Total
65119 FYI VEHICLE/EQUIPMENT REPLACEMENT
3,030,000 -
3,030,000
20A66A00 7A14,000 8,138.000 6,806,000 4,930,000 -
- 47,762,000
668,000
668,000
21721
64718 MUNIS / ENERGOV/ ERP PR
683,165
683,165
PARIOMQ'A�1MIN1S1RA11oN . '• . _� - , ...
-
.,
68022 SKIDATA GARAGE SOFTWARE UPGRADE
475,000
475,000
PAW AM UMA=M:
59,263
24530
62823 SCOTT RAKOW ICE RINK REFRIGERATION
1,128,000
1,128,000
POIICO OW of"a
GO#45: FIRE STATION #1
4,000,000 - 6,000,000
20297 EXPANSION OF CITY WIDE SURVEILLANCE
180,000
180,000
21620 SECURITY CAMERAS ON BEACHWALK 23.46
903,000
903,000
22118 ENTERTAINMENT DISTRICT CAMERAS
170,000
170,000
22819 GO#57: CAMERAS- ENTERTAINMENT DIST.
1,490,000
1,490,000
28519 GO#47: LICENSE PLATE READERS
1,950,000
1,950,000
61790 MBPD OFF-DUTY EMPLOYMENT SOFTWARE
60,000
60,000
68819 GO#50: CAMERAS- BUSINESS DIST.
825,000
825,000
69119 GO#56: CAMERAS BEACHWALK
700,000
700,000
6,270,000 -
- 6,2781000
011140c "Fl11C.�OMM... T1C1AIti
,
23119 GO#49: PUBLIC SAFETY RADIO SYSTEM
10,367,718
10,367,718
..
. OYBIMlIJI.ffiOORAIq '
20627
NORTH SHORE BANDSHELL CANOPY
668,000
668,000
21721
REAL TIME CRIME CENTER BUILDOUT
1,500,000
1,500,000
21821
MBPD HEADQUARTERS RENOVATION
181,937
181,937
22218
NORTH BEACH YARD
59,263
59,263
24530
SUNSET ISLANDS 1$2 GUARDHOUSE
668,225
668,225
28319
GO#45: FIRE STATION #1
4,000,000 - 6,000,000
10,000,000
28600
NSPYC EXTERIOR CAFE AND RESTROOMS
1,001,000 400,000 312,000
1,713,000
6A78All6 400,000' 6.312.000 - - 14,790A24
.4111"4psr777777
64318 BAYSHORE GREEN WASTE FACILITY 750,000 750,000
Page 1108 of 1657
ATTACHMENT B
CITY OF MIAMI BEACH
f i �`���� 6 6 FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY PROGRAM
PROJECT PROGRAM Previous Years FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 Future Total
►ACMLL%', �FL1ifMANA0kIY1IMF::•'•.: =:.
.
20820 MB GOLF COURSE STORAGE TANK
20721 GREENSPACE FACILITY RENOVATION
200,000
443,000
- 643,000
22720 PUBLIC WORKS FACILITY -PUMP STATION
257,000
-
-
5,290,000 5,290,000
27019 GO#28: ART DECO MUSEUM
354,909
2,000,000
- 2,000,000
65622 SHANE ROWING CENTER ROOF REPLACEMENT
61,000
-
61,000
66021 SOUTH POINTE PARK RESTROOMS RENOVATION
86,000
-
20623 MIAMI BEACH GOLF COURSE RENOVATION
86,000
86,000
261,000
2,443,000
51290,000 8,011110AN
pm:
61822 MB GOLF CLUB DRIVING RANGE NETTING
114,000
114,000
28619 GO#51: FIRE STATION #3
- 70,000
10,000,000
10,000,000
RRL ■LiCOL
28419 GO#46: OCEAN RESCUE NOBE FACILITY
1,000,000
4,000,000
- 5,000,000
62919 OUTDOOR TRAINING FACILITY (FIRE(
-
-
200,000 200,000
1,000,000
-
4,000,000
200,000 8,200,000
PAtUANDUCIII&ATON ..... ':::::. ...
20920 NORTH SHORE BANDSHELL REAR SEATING
188,000
188,000
62723 SCOTT RAKOW ICE RINK PERIMETER BOAR
-
354,000
354,000
188,000
354,000
- - 542,000
/Q CHIEl3C1lR :. , . ..
..
7.
28819 GO#54: MARINE PATROL FACILITY
2,000,000
700,000
2,700,000
10URW a CULTURAL 01FAR7lYIiMf
20421 NORTH SHORE BANDSHELL REAR CANOPY
310,000
310,000
A F= MAIMfiLVMT'; .:
20820 MB GOLF COURSE STORAGE TANK
97,909
97,909
21120 MIAMI BEACH GOLF CLUBHOUSE ROOF
257,000
257,000
60921 N. SHORES GOLF CLUB -CLUBHOUSE ROOF
184,000
184,000
354,909
- 184,000 -
538,909
PARKf'A�Iq RLCRMTIOH. ,.• ,...:.i; ,.....:. .
20108 MIAMI B. GOLF COURSE PRACTICE TEE
124,000
124,000
20623 MIAMI BEACH GOLF COURSE RENOVATION
-
6,000,000 6,000,000
21420 MB GOLF COURSE IRRIGATION PUMP
100,000
-
- 100,000
61822 MB GOLF CLUB DRIVING RANGE NETTING
114,000
114,000
61922 MB GOLF CLUBHOUSE PAINTING
- 70,000
70,000
Page 1109 of 1657
ATTACHMENT B
r1 i CITY OF MIAMI BEACH
`+ r �+ \A Iy FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY PROGRAM
PROJECT PROGRAM Previous Years FY 2023 FY 2023 FY 2024 FY 2025 FY 2026 Futuro Total
63622 MB GOLF CLUB REEL GRINDERS REPLACEMENT
71,000
-
71,000
68120 NORMANDY SHORES GOLF CLUB PUMPS
820,000
- 196,000
196,000
26,545
224,000 185,000
70,000 196,000
- 6,000000 6,675,000
9ARU fANDiCAP! 111iITiI106111d11 .
1,400,000
20011 WORLD WAR MEMORIAL
60325 NORMANDY SHORES GOLF CLUB TEE RENO
125,000
-
125,000
60824 MB GOLF CLUBHOUSE CARPET REPLACEMENT
-
42,000
42,000
62023 MB GOLF CLUB KITCHEN FLOOR REPLACEMENT
43,000
-
43,000
62122 NORMANDY SHORES GOLF CARPET REPLACEMENT
40,000
-
40,000
. 208,000
42,000
- 140A000
24630 FLAGLER MONUMENT SOLAR ILLUMINATION
289,000 -
289,000
60031 WATER TOWER RESTORATION STAR ISLAND
820,000
820,000
64421 MBPD CUBAN MONUMENT RESTORATION
26,545 -
26,545
27,590,271
639,245 - 820,000 -
- - 1,459,245
1TCONSM • CULTURAL DE9ARTMEaf1
1,400,000
20011 WORLD WAR MEMORIAL
62,000
62,000
27830
PARKING GARAGE AT 1262 COLLINS AVE
9,738,694
9,738,694
28010
COLLINS PARK PARKING GARAGE
27,590,271
27,590,271
60119
17TH STREET PARKING GARAGE COATING
1,400,000
1,400,000
50,074,965
- 1,000,000
- - - 51,074,065
RA
6lffl!<fAfA1WlOMAWf
20022
16TH ST. GARAGE -JOINT REPLACEMENT
-
200,000
200,000
20025
PENN GARAGE -ELEVATOR RENEWAL
218,000
500,000 718,000
20026
7TH STREET GARAGE -ELEVATOR
-
400,000 - 400,000
20125
1755 MERIDIAN GARAGE ELEVATOR
- 500,000 500,000
Page 1110
of 1657
ATTACHMENT B
CITY OF MIAMI BEACH
1 �, ';1 ! I B E R FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY PROGRAM
PROJECT PROGRAM Previous Years FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 Futuro Total
20225
SUNSET HARBOUR GARAGE ELEVATOR
500,000
500,000
20325
SUNSET HARBOUR GARAGE -ROOFTOP
-
300,000
300,000
20823
1755 MERIDIAN GARAGE FIRE SPRINKLER
300,000
-
300,000
20923
SUNSET HARBOUR GARAGE SPRINKLER
-
300,000
300,000
21121
7TH ST GARAGE -ENTRANCE FLOOD CONTROL
278,000
-
-
278,000
21124
16TH ST GARAGE -EXTERIOR RENEWAL
-
400,000
400,000
21224
1755 GARAGE GENERATOR
200,000
200,000
21324
SUNSET HARBOUR GARAGE GENERATOR
-
200,000
200,000
21920
RECONFIGURATION OF SANITATION AREA
330,000
-
330,000
22120
12TH ST GARAGE -ELEVATOR REPLACEMENT
174,450
-
174,450
22122
SUNSET HARBOUR GARAGE SCREENING
-
200,000
200,000
22220
17TH ST. GARAGE -ELECTRICAL FEEDER
-
225,000
225,000
26290
17TH ST. PARKING GARAGE MAINTENANCE
235,000
-
-
235,000
60023
16TH ST GARAGE -PLUMBING SYSTEM UPDATE.
-
75,000
-
75,000
60025
PENN GARAGE -ROOFTOP -STAIRS ELEVATOR
-
-
40,000
40,000
60120
13TH STREET PARKING GARAGE COATING
800,000
800,000
60124
7TH STREET GARAGE -LANDSCAPING
-
120,000
-
120,000
60125
1755 MERIDIAN GARAGE OFFICE ROOF
300,000
300,000
60130
13TH ST GARAGE FIRE ALARM
46,580
-
46,580
60190
ANCHOR GARAGE ELEVATOR REPLACEMENT
357,995
357,995
60224
7 ST GARAGE -SUPERSTRUCTURE RENEWAL
-
-
250,000
250,000
60324
16TH STREET GARAGE -GENERATOR
-
250,000
-
250,000
60422
7TH ST GARAGE -FIRE SPRINKLER & PUMP
300,000
300,000
60424
PENN GARAGE -GENERATOR RENEWAL
-
200,000
200,000
60522
12TH ST GARAGE. INT. FLOOR DRAINAGE
25,000
-
25,000
60524
PENN GARAGE -PLUMBING SYSTEM UPDATE
-
-
75,000
75,000
60620
7TH STREET GARAGE -INTERIOR DRAINAGE
30,000
-
-
30,000
60622
13TH ST. GARAGE -PARKING SIGN RENEWAL
-
30,000
-
30,000
60623
7TH STREET GARAGE -STAIRWELL RAILING
25,000
-
25,000
60624
17TH STREET GARAGE -EXTERIOR COATING
-
-
300,000
300,000
60722
42 ST GARAGE -STAIRWELL WATERPROOFING
50,000
-
50,000
60723
7TH ST GARAGE -TRAFFIC COATING
150,000
-
150,000
60724
42ND STREET GARAGE -FIRE SPRINKLER
40,000
40,000
Page 1111 of 1657
ATTACHMENT B
/1, CITY OF MIAMI BEACH
V11,11.-.3, I�A�,�, 1 E AC H FY 2022.2026 CAPITAL IMPROVEMENT PLAN BY PROGRAM
PROJECT PROGRAM Previous Years FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 Futuro Total
60822
1755 MERIDIAN GARAGE LED LIGHTING
150,000
-
150,000
60823
PENN GARAGE -FIRE SPRINKLER RENEWAL
-
300,000
300,000
60922
SUNSET HARBOUR GARAGE SEALING
75,000
-
75,000
60923
PENN GARAGE -FIRE PUMP REPLACEMENT
-
100,000
100,000
61021
MB POLICE GARAGE CONCRETE SPALLING
833,000
833,000
61022
SUNSET HARBOUR GARAGE -TRAFFIC COATING
303,000
303,000
61023
PENN GARAGE -FIRE ALARM SYSTEM
-
35,000
35,000
61118
7TH STREET GARAGE UPGRADE LIGHTING
127,993
-
127,993
61123
12TH ST GARAGE -STAIRWELL DOOR
-
32,000
32,000
61217
13TH ST. GARAGE-WINDOW/GLASS BLOCK
35,350
35,350
61218
7TH STREET PARKING GARAGE ROOF TOP
140,251
-
140,251
61223
12TH ST. GARAGE -STAIRWELL RAILING
-
-
25,000
25,000
61317
13TH ST. GARAGE -STAIRWELL RAILING
50,000
50,000
61323
42ND ST GARAGE -PLUMBING SYSTEM UPDATE.
-
75,000
75,000
61417
17TH ST GARAGE INT- FLOOR DRAINAGE
30,000
-
30,000
61423
1755 GARAGE FIRE PUMP REPLACEMENT
-
100,000
100,000
61517
17 ST GARAGE -STORAGE SPACE RENOVATION
100,000
100,000
61617
17TH ST GARAGE -PLUMBING SYSTEM UPDATE.
-
75,000
75,000
61623
SUNSET HARBOUR GARAGE -FIRE ALARM
35,000
-
35,000
61660
13TH STREET PARKING GARAGE ELEVATOR
325,300
325,300
61717
42ND ST. GARAGE-50YR CERTIFICATION
312,090
312,090
61718
16TH STREET GARAGE FIRE SPRINKLER
1,444,000
-
1,444,000
61817
42ND ST. GARAGE -STAIRWELL RAILING
-
25,000
25,000
61818
16TH STREET GARAGE STAIRWAYS
101,200
-
101,200
61917
1755 MERIDIAN GARAGE FLOOR DRAINAGE
-
200,000
200,000
61918
16TH STREET GARAGE ROOF AND DECK
1,808,000
-
1,808,000
61930
17TH STREET PARKING GARAGE ELEVATOR
876,000
-
876,000
62017
SUNSET HARBOUR GARAGE LED LIGHTING
-
300,000
300,000
62100
42ND ST. PARKING GARAGE MAINTENANCE
400,000
-
400,000
62218
13TH STREET GARAGE LIGHTING (LED)
86,000
86,000
62223
12TH STREET OVERHEAD GATE RENEWAL
-
61,100
61,100
62418
12TH STREET GARAGE ROOF AND DECK
299,806
-
-
299,806
62422
16TH STREET GARAGE HVAC RENEWAL
-
34,000
34,000
Page 1112 of 1657
ATTACHMENT B
CITY OF MIAMI BEACH
I B FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY PROGRAM
PROJECT PROGRAM Previous Years FY 2022 FY 2023 FY 2024 FY 2025 FY 7026 Future Total
62518
1755 MERIDIAN GARAGE ROOF AND DECK
500,000
-
500,000
62522
13TH STREET GARAGE NEON RENEWAL
-
67,000
67,000
62621
7TH STREET GARAGE-OFFICE/RESTROOM
36,000
36,000
62721
16TH STREET GARAGE-OFFICE/RESTROOM
30,000
30,000
62821
16TH STREET GARAGE -ROOF TOP RENEWAL
34,000 -
34,000
63021
PENN GARAGE -HVAC RENEWAL
85,000 35,000
120,000
63121
PENN GARAGE -TRAFFIC COATING -RETAIL
100,000 -
100,000
63221
12TH STREET GARAGE -DOMESTIC WATER
-
79,000
79,000
63321
13TH STREET GARAGE-40YR CERT.
300,000
-
300,000
64018
17TH ST GARAGE 40YR RECERTIFICATION
755,427
755,427
64319
PENN GARAGE - NEW LIGHTING DISPLAY
135,000
135,000
64419
13TH STREET GARAGE - WATER SYSTEM
33,000
33,000
64519
17TH STREET GARAGE - 1ST FL OFFICE
45,000
45,000
64719
7TH STREET GARAGE -DOOR REPLACEMENT
50,000
50,000
65019
16TH STREET GARAGE )ANCHOR) - PAINT
100,000
100,000
65521
16TH STREET CANVAS AWNING RENEWAL
56,560
56,560
65621
42ND STREET GARAGE FALL PROTECTION
151,500
151,500
66121
12 ST. PARKING GARAGE FIRE ALARM
50,000
50,000
67118
ANCHOR - INTERIOR FLOOR DRAINAGE
30,000
30,000
67218
PENN GARAGE -SEALING OF SUPERSTRUCTURE
25,000
25,000
67318
PENN GARAGE -INT. SURFACE RESTORATION
95,000
95,000
67418
42ND STREET GARAGE -DISPATCH AREA
100,000
100,000
67520
7TH STREET GARAGE -ROOFING REPAIRS
45,756
45,756
67618
12TH STREET GARAGE -ROOF RENEWAL
64,000
64,000
67818
17 ST GARAGE -GENERATOR REPLACEMENT
120,000
-
120,000
67922
16TH STREET GARAGE -EXTERIOR PAINT RENEWAL &
WATERPROOFING
-
550,000
550,000
68018
42ND STREET GARAGE -GENERATOR
96,550
-
96,550
68118
42ND ST GARAGE- INTERIOR DRAINAGE
34,000
34,000
68220
7TH ST GARAGE SURFACE RESTORATION
95,000
95,000
69310
7TH ST. GARAGE FIRE ALARM SYSTEM
51,087
51,087
69370
42ND ST. GARAGE FIRE ALARM SYSTEM
51,087
51,087
69380
42ND ST GARAGE ELEVATOR REPLACEMENT
565,145
565,145
11,514,127
3,471,000 2,7139,100 IASA00 5,325,000 500A00
22,384,227
Page 1113 of 1657
P , I r, ), r: CITY OF MIAMI BEACH
v -4, G 1� 1� t l b r-. A(�,, H FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY PROGRAM
PROJECT PROGRAM Previous Years FY 2022 FY 2023 FY 2024 FY 2025
ATTACHMENT B
FY 2026 Future Total
�.
TAgK1ND A011A1N1i1!M11ON-: .` .: - -
22020 GARAGE -LICENSE PLATE RECOGNITION 855,000 - 855,000
26100 GARAGE SECURITY CAMERA SYSTEM 1,413,057 1,413,057
2,268,037 - - 5,268,057
26340 PENRODS AT 1 OCEAN DR. PARKING LOT
2,954,113
2,954,113
27480 SURFACE LOT P48 BASS MUSEUM LOT
220,000
220,000
29580 LOT 9D P86-6976 INDIAN CREEK DRIVE
468,000
468,000
4,995,492
4,349,142 - - - -
- 4,549,142
rAc�tl�s a: aeRr r��tr
18,193,130
28710 P1 6TH ST & COLLINS PARKING LOT
341,000 - -
341,000
60317 CITYWIDE PARKING LOTS IMPROVEMENTS
150,000 150,000 150,000 150,000
600,000
BAND SHELL MASTER PLAN
341AN 1501000 150000 150,000 150,000 -
- 941,000
20918
BRITTANY BAY PARK
1,709,729
1,709,729
22750
ALTOS DEL MAR PARK
4,995,492
4,995,492
23200
FLAMINGO PARK
18,193,130
18,193,130
25019
GO#I : 72 ST. COMMUNITY COMPLEX
10,800,000
43,000,000
53,800,000
25380
BAND SHELL MASTER PLAN
2,633,372
2,633,372
25419
GO#5: FLAMINGO PARK & YOUTH CENTER
15,400,000
15,150,000
30,550,000
26219
GO#13: N.SHORE PARK & YOUTH CENTER
3,540,000
2,185,000
5,725,000
26500
KAYAK LAUNCH DOCKS
644,080
-
644,080
26719
GO#23: BAYWALK PEDESTRIAN BRIDGE
10,000,000
5,000,OOD
15,000,000
26819
GO#24: MIDDLE BEACH BEACHWALK PH3
4,500,000
4,500,000
27930
SHARED PATH ON PARKVIEW ISLAND PARK
320,000
320,000
27950
NORTH BEACH OCEANSIDE PARK
15,792,075
15,792,075
28550 LIFEGUARD_ STAND REPLACEMENTS 3,319,989 3,319;989
28850 MAURICE GIBB PARK REDESIGN 2,628,682 2,628,682
Page 1114 of 1657
ATTACHMENT B
CITY OF MIAMI BEACH
PAI ,4 �'�� f 1 B E A,C H FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY PROGRAM
PROJECT PROGRAM Previous Years FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 Future Total
29600
MUSS PARK FACILITY
2,695,000
2,695,000
97,971,549
400,000 65,757A00
- 164,128,349
roNt
26519
GO# 18: SCOTT RAKOW YOUTH CENTER
4,053,045
4,053,045
26919
GO#27: LOG CABIN
-
1,076,000
1,076,000
60720
BEACHWALK TREE WELLS 14-22 STREET
150,000
-
150,000
4,203,045
- 1,076A00
-
-
- 5,279,045
PARKS AWW141mm "
66322
NON -MOTORIZED VESSEL KAYAK LAUNCH
70,000 400,000
470,000
AARKB A ' ReCl1lA110N ..:.,
20023
ALLISON PARK PLAYGROUND REPLACEMENT
-
795,000
795,000
20123
INDIAN BCH PK PLAYGROUND EXPANSION
792,000
-
792,000
20187
LUMMUS PARK MUSCLE BEACH UPGRADE
300,000
-
300,000
20223
LUMMUS PARK PLAYGROUND REPLACEMENT
-
750,000
750,000
20237
FAIRWAY PARK IMPROVEMENTS
1,428,953
- 877,000
877,000
3,182,953
20247
CITYWIDE PARKS IRRIGATION SYSTEM
14,275
156,000 -
-
170,275
20300
NORMANDY ISLE PARK TURF INSTALLATION
398,000
465,500
465,500
1,329,000
20321
BEACHVIEW PK PLAYGROUND REPLACEMENT
-
-
505,000
505,000
20423
FLAMINGO PK FOOTBALL FENCE
613,000
-
613,000
20425
FLAMINGO PARK SOCCER FIELD TURF
281,000 -
281,000
20523
STILLWATER PARK LIGHTING & SOCCER
- 481,000
481,000
20577
BELLE ISLE PARK PLAYGROUND
576,500
-
-
576,500
20722
FLAMINGO PK PLAYGROUND REPLACEMENT
-
830,000
830,000
20723
CRESPI PARK LIGHTING & MICRO SOCCER
481,000
481,000
20821
BISCAYNE ELEM SHARED FIELD LIGHTING
1,270,170
1,270,170
20822
FLAMINGO PK FOOTBALL STADIUM TURF
1,163,000
1,163,000
20921
NORMANDY ISLE PARK PLAYGROUND
489,000
489,000
21021
NSPYC KITCHEN & CABINETRY ADDITION
344,000
344,000
21022
WEST LOTS 85.86 ST CONVERSION
2,436,100
2,436,100
22420
POLO PARK LIGHTING & SOCCER FIELD
857,680
-
857,680
23018
SOUTH POINTE PARK LIGHTING
585,000
585,000
23518
BATTING CAGES AT NORTH SHORE PARK
203,000
203,000
25119
GO#2: COLLINS PARK
557,287
557,287
25219
GO#3: CRESPI PARK
184,921
184,921
Page 1115 of 1657
ATTACHMENT B
CITY OF MIAMI BEACH
i `� .- FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY PROGRAM
PROJECT PROGRAM Previous Years FY 1012 FY 2023 FY 2024 FY 2025 FY 2026 Future Total
25319
GO#4: FAIRWAY PARK
260,000
260,000
25519
GO#6: FISHER PARK
105,000
105,000
25619
GO#7: LA GORCE PARK
150,000
150,000
25719
GO#8: LUMMUS PARK
4,737,000
4,737,000
25819
GO#9: MARJORY STONEMAN DOUGLAS PARK
682,000
682,000
25919
GO#10: MAURICE GIBB PARK
4,500,000
4,500,000
26019
GO#11: MUSS PARK
-
250,000
250,000
26119
GO#12: NOBE OCEANSIDE PARK BEACHWALK
2,000,000
-
2,000.000
26319
GO#15: PAR 3 / BAYSHORE PARK
15,700,000
15.700,000
26419
GO#17: POLO PARK
493,675
493,675
27219
GO#30: SKATE PARK
750,000
750,000
28560
COLLINS PK LIGHTING SOUND SYSTEM
236,000
236,000
29550
CMB SKATEPARK
190,280
190,280
29620
ALLISON PARK REDESIGN
1,532,000
1,532,000
60026
BELLE ISLE PARK PLAYGROUND REPLACEMENT
-
638,000
638,000
60123
CRESPI PARK PLAYGROUND REPLACEMENT
407,000
-
407,000
60126
MUSS PARK PLAYGROUND REPLACEMENT
-
638,000
638,000
60223
POLO PARK PLAYGROUND REPLACEMENT
476,000
-
476,000
60226
PARK VIEW ISLAND PARK PLAYGROUND REPLACEMENT
-
-
-
497,000
497,000
60321
CITYWIDE PARKS COURT REPAIRS
105,000
105,000
105,000
105,000
105,000
105,000
630,000
60323
STILLWATER PLAYGROUND REPLACEMENT
-
-
570,000
-
-
570,000
60421
CITYWIDE FITNESS COURSE REPLACEMENT
100,000
100,000
100,000
100,000
100,000
100,000
600,000
60924
NSPYC SAFETY IMPROVEMENTS -FRONT DESK
-
-
372,000
-
-
372,000
62022
FLAMINGO PARK TENNIS CENTER COURTS
-
160,000
160,000
63319
PARK VIEW ISLAND ANNEX - DOG PARK
67,000
-
67,000
63519
BUOY PARK REFORESTATION IMPROVEMENT
-
150,000
-
-
150,000
64621
CITYWIDE PK LANDSCAPING IMPROVEMENT
200,000
152,000
248,000
200,000
200,000
200,000
200,000
1,400,000
65722
FLAMINGO PARK BASEBALL STADIUM STAN
65,000
495,000
-
-
-
560,000
66518
SECURITY AUDIO SYSTEM FOR ALL POOLS
100,000
100,000
66920
S. P. PARK -FISHING PIER RAILING REP
198,000
-
198,000
67519
GO#14: PALM ISLAND PARK
-
231,000
231,000
67619
GO#16: PINETREE PARK
700,000
700,000
67719
GO#20: SOUTH POINTE PARK
480,000
480,000
Page 1116 of 1657
ATTACHMENT B
CITY OF MIAMI BEACH
r'FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY PROGRAM
PROJECT PROGRAM Previous Years FY 2032 FY 2013 FY 2024 FY 2025 FY 2026 Future Total
67819
GO#21: STILLWATER PARK
142,441
-
142,441
67919
GO#22: TATUM PARK
-
840,000
840,000
37,3111118,012
936,000 7,974111,114110 6,447,670
4,805,100 1,324A00 11WAN 60,619,282
�'Yw tNtIRINQ
`•
BASS MUSEUM GENERATOR
117,816
117,816
27990
MAURICE GIBB PARK FLOATING DOCK
550,000
66,127
550,000
:1RlfMI
a"1114DIPARTIAttiF
- -
28919
GO#26: ROOFS FOR CULTURAL FACILITIES.
23318
SOUNDSCAPE AUDIO IMPROVEMENTS
751,410
POLICE STATION MEN'S LOCKER ROOM
751,410
26619
GO#19: SOUNDSCAPE PARK
4,500,000
11,370
4,500,000
27119
GO#29: WEST LOTS
1,000,000
4,000,000
5,000,000
SUNSET HARBOUR GARAGE INT. FLOOR
6,251,410
4,000,000 -
- 10,231,410
110111AW011111iff
SMAINASM. ,..
65422
WATERWAY MARKERS & SIGNS
395,000
395,000
rAtacllnt
Iter IYUN�►aMtwt.-,:. .
20110
28TH STREET OBELISK STABILIZATION
607,230
607,230
25980
BASS MUSEUM GENERATOR
117,816
117,816
26010
BASS MUSEUM HYDRAULIC ELEVATOR
66,127
66,127
27780
MIAMI CITY BALLET WINDOWS
441,799
441,799
28919
GO#26: ROOFS FOR CULTURAL FACILITIES.
2,932,631
2,932,631
60030
POLICE STATION MEN'S LOCKER ROOM
241,371
241,371
60038
SOUTH SHORE C.C. FIRE ALARM RENEWAL
11,370
11,370
60077
FIRE STATION 2 ALARM SYSTEM
99,000
99,000
60225
SUNSET HARBOUR GARAGE INT. FLOOR
34,000 - 34,000
60326
FY26VEHICLE/EQUIPMENT REPLACEMENT
-
5,107,000 5,107,000
60418
HISTORIC CITY HALL HUMIDITY CONTROL
96,066
- 96,068
60420
FIRE STATION 2 -A/C REPLACEMENT
71,200
71,200
60519
CITY HALL 40 -YR STRUCTURAL
154,800 -
154,800
60520
MBPD-CONDENSER AND PUMPS
- 125,000
125,000
60618
HISTORIC CITY HALL FIRE ALARM
151,618
151,618
60718
NORTH SHORE PARK YOUTH CENTER A/C
80,000
80,000
60719
UNIDAD ELEVATOR MODERNIZATION
70,000
70,000
60821
CITY HALL -REPLACE RESTROOM EXHAUST
- 35,000
35,000
Page 1117 of 1657
ATTACHMENT B
CITY OF MIAMI BEACH
l ,f1��I BE �"" FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY PROGRAM
PROJECT PROGRAM Previous Years FY 2022 FY 2023 FY 2074 FY 2075 FY 2026 Futuro Total
60920
HISTORIC CITY HALL-VFD REPLACEMENT
200,000
200,000
61020
CITY HALL -GENERATOR REPLACEMENT
600,000
600,000
61100
P.A.L. BUILDING - FIRE ALARM
74,500
74,500
61 120
CITY HALL -COOLING TOWER BASE
100,000
-
100,000
61221
NORM. ISLE POOL LOCKER ROOM 8. PUMPS
-
250,000
250,000
61290
CITY HALL FIRE ALARM SYSTEM
293,325
-
293,325
61320
UNIDAD BUILDING -DOOR RENEWAL
-
63,000
63,000
61321
71 ST STREET WELCOME SIGN RENOVATION
40,000
40,000
61419
BEACHFRONT RESTROOMS-RENOVATIONS
138,000
-
138,000
61420
UNIDAD BUILDING -WINDOW SEAL RENEWAL
-
40,000
40,000
61521
CITY HALL LOADING DOCK RESURFACING
70,000
70,000
61523
SUNSET HARBOUR GARAGE FIRE PUMP
- 100,000
100,000
61621
CITY HALL CHAMBER & PRESS ROOM RENO
-
900,000 -
900,000
61819
BEACH WALK DRAINAGE - 24 ST TO 46 ST
100,000
100,000
61919
41 ST STREET FOUNTAIN RESTORATION
82,000
-
82,000
61921
10TH ST. AUDIT. ENTRANCE DRAINAGE
250,000
250,000
62021
COLONY THEATER ELEVATOR
87,000 -
87,000
62117
FIRE STATION Tit TRAINING TOWER
401,691
-
401,691
62118
12TH STREET PARKING LIGHTING (LED)
64,000
64,000
62119
BASS MUSEUM- ROOF REPLACEMENT
392,464
392,464
62121
BOTANICAL GARDENS RESTROOMS
50,500
50,500
62217
10TH ST AUDITORIUM COATING OF ROOF
65,650
65,650
62221
COLONY THEATER RESTROOM RENOVATION
73,000
73,000
62321
COLONY THEATER EXTERIOR PAINTING
-
68,000
68,000
62419
BASS MUSEUM - FREIGHT ELEVATOR
88,647
-
88,647
62421
COLONY THEATER LED LIGHTS UPGRADE
40,000
40,000
62519
BEACHWALK DRAINAGE-S.POINTE - 23 ST
220,000
-
220,000
62523
ARTISTIC BOLLARDS
750,000
750,000
62622
HISTORIC CITY HALL FRONT ELEVATION
69,000
69,000
62822
INTERNAL AFFAIRS RESTROOM RENO
-
139,000
139,000
62920
FIRE STATION A2 WATERPROOFING
192,000
192,000
62922
BASS MUSEUM EXTERIOR WALL REPAIRS
-
39,000
39,000
62923
FLAMINGO PARK HURRICANE WINDOWS
98,000
98,000
Page 1118 of 1657
ATTACHMENT B
CITY OF MIAMI BEACH
A�� ' � H FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY PROGRAM
PROJECT PROGRAM Previous Years FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 Futuro Total
63019
BUILDOUT 1701 4TH FL FOR HOUSING
133,000
-
133,000
63022
MIAMI CITY BALLET EXIT SIGN RENEWAL
-
73,000
73,000
63023
HISTORIC CH 2ND FLOOR RESTROOMS
74,000
74,000
63122
10TH ST AUDITORIUM LED UPGRADE
104,000
104,000
63123
MBPD GARAGE LED LIGHT UPGRADE
110,000
110,000
63222
COLONY THEATER EXIT SIGN RENEWAL
36,000
36,000
63223
BOYS & GIRLS CLUB SECURITY ENCLOSURE
27,000
27,000
63323
MBPD NESS DOCK RENOVATION
-
77,000
77,000
63350
POLICE HQ ELEVATORS & OTHER PROJECT
384,260
384,260
63420
NS YOUTH CNTR ROOFTOP A/C RENEWAL
-
120,000
-
120,000
63422
HISTORIC C. HALL ENERGY EFF. WINDOW
52,000
52,000
63423
NORMANDY POOL LIGHTING IMPROVEMENT
41,000
41,000
63522
NORTH SHORE BANDSHELL SIGNAGE REPL.
97,000
97,000
63523
FIRE STATION 1 BATHROOMS RENOVATION
120,000
120,000
63623
FIRE STATION 1 ROLL -UP DOOR RENEWAL
-
51,000
51,000
63718
SANITATION INTERIOR REPLACEMENT
502,800
-
502,800
63719
1755 MERIDIAN -CHILLER REPLACEMENT
211,045
211,045
63720
10TH ST AUDITORIUM -LOUVER
-
52,000
52,000
63721
FIRE STATION N1 ROOF REPAIRS
41,500
41,500
63722
SMART CARD ACCESS SYSTEM -PHASE II
195,000
195,000
63723
FIRE ADMINISTRATION FLOORING RENEWAL
-
34,000
34,000
63819
SSCC ROOT MITIGATION & FLOORING REP
272
272
63821
MBPD 4TH FLOOR HVAC CONTROLS
312,000
-
312,000
63822
1755 ROOF REPLACEMENT
-
223,000
223,000
63823
FIRE ADMIN BLDG UPS SYSTEM RENEWAL
-
39,000
39,000
63919
SMART CARD ACCESS SYSTEM- PHASE 1
250,000
250,000
63921
1701 MERIDIAN AVE 50 YEAR RECERTIFICATION
50,500
-
50,500
63922
FLEET BAYS PLUMBING RENEWAL
141,000
141,000
63923
BASS MUSEUM KEYSTONE SEAL
63,000
63,000
64019
CITY HALL ENERGY EFFICIENT BUILDING
156,000
156,000
64020
CITY HALL CARD ACCESS SYSTEM REPL.
80,436
80,436
64021
HISTORIC CITY HALL 90 YEAR RECERTIFICATION
66,000
-
66,000
64022
777 FOUNTAIN/ COURTYARD RENOVATIONS
-
131,000
131,000
Page 1119 of 1657
ATTACHMENT B
CITY OF MIAMI BEACH
Py V 1 I R 1. SH FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY PROGRAM
PROJECT PROGRAM Previous Years FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 Future Total
64023
MIAMI CITY BALLET VARIABLE AIR VALVE
-
34,000
34,000
64121
FIRE STATION #3 40 YEAR RECERT.
48,700
48,700
64123
COLONY THEATER IMPACT GLASS
-
103,000
103,000
64220
PUBLIC WORKS FACILITY EXTERIOR
84,914
-
84,914
64221
BASS MUSEUM WINDOW REPLACEMENT
134,710
-
134,710
64222
1755 MERIDIAN FRESH AIR INTAKES
-
63,000
63,000
64223
BASS MUSEUM INTERIOR GALLERY WALL
-
-
63,000
63,000
64320
CITY HALL -COOLING TOWER CONDENSER
90,000
-
90•000
64321
BASS MUSEUM CONDENSER WATER PUMPS
45,450
-
45,450
64322
1755 MERIDIAN ROOF REPLACEMENT
82,000
82,000
64323
MIAMI CITY BALLET ACCESS CONTROL
-
-
50,000
50,000
64418
THE FILLMORE 40 -YR RECERTIFICATION
622,298
-
622,298
64420
CITY HALL RESTROOM RENOVATIONS
-
-
250,000
250,000
64422
MBPD GARAGE EXIT SIGNS AND SAFETY
31,000
31,000
64423
MIAMI CITY BALLET UV LIGHT RETROFIT
-
-
33,000
33,000
64521
10TH ST AUDITORIUM HEAT PUMP RENEWAL
191,900
-
191,900
64522
MBPD MAIN ROOF REPAIRS
-
136,000
-
136,000
64523
MIAMI CITY BALLET BOARD ROOM CARPET
-
-
88,000
88,000
64618
MIAMI CITY BALLET VARIOUS REPAIRS
278,250
-
278,250
64619
SURFACE LOTS CITYWIDE LANDSCAPING
100,000
-
100,000
64622
SCOTT RAKOW YOUTH CENTER LIGHTING
115,000
-
115,000
64623
BASS MUSEUM GALLERY FLOOR RENOVATION
-
-
226,000
226,000
64721
MIDDLE BEACH WATER TOWER PAINTING
50,000
-
50,000
64722
SHANE ROWING CENTER HVAC UNITS REPLACEMENT
-
61,000
61,000
64723
10TH STREET AUDITORIUM SECURITY ENH
-
34,000
34,000
64819
COLONY THEATER - FIRE ALARM SYSTEM
78,000
- - -
78,000
64821
SECURITY ENHANCEMENTS CITYWIDE
500,000
-
1,000,000 500,000 500,000
2,500,000
64822
SHANE ROWING CENTER DOCK RAMP
-
413,000
227,000
640,000
64823
BASS MUSEUM TRANQUILITY FOUNTAIN
-
-
46,000
46,000
64921
OCEAN RESCUE FIRE ALARM RENEWAL
30,300
-
30,300
64923
PW WHS & SHOPS LED LIGHTS RETROFIT
-
74,000
74,000
65121
7 STREET GARAGE UPS BATTERY SYSTEM
66,600
-
66,600
65123
CONV.CTR. VIBRATION ISOLATORS
100,000
100,000
Page 1120 of 1657
ATTACHMENT B
CITY OF MIAMI BEACH
'tit f if � j��/ 1 ` B A H FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY PROGRAM
PROJECT PROGRAM Previous Years FY 7022 FY 2023 FY 2024 FY 2075 FY 2026 Futuro Total
65218
PURDY AVE BOAT RAMP REPAIRS
464,694
464,694
65219
SOUTH POINTE PARK HVAC REPLACEMENT
160,000
160,000
65220
MIAMI CITY BALLET STUDIO FLOORING
140,000
39,000
-
179,000
65223
CONVENTION CTR. EXHIBIT HALL LIGHTS
-
-
60,000
60,000
65319
CODE / HOUSING OFFICES RELOCATION
588,475
-
588,475
65320
UNIDAD INTERIOR & EXTERIOR PAINTING
-
-
90,000
90,000
65420
MBPD NORTH SUB STATION PARKING LOT
233,000
233,000
65520
MBPD N SUB STN PAINTING, FLOORING
-
234,000
234,000
65522
BASS MUSEUM 40 YEAR RECERTIFICATION
100,000
100,000
65618
FLEET MANAGEMENT STAIRS RESTORATION
-
35,000
35,000
65718
FLEET MANAGEMENT WAREHOUSE CEILING
30,000
30,000
65720
HISTORIC CH -ROOF ACCESS LADDER
-
100,000
100,000
65818
FLEET MANAGEMENT FIRE SPRINKLER
250,000
-
250,000
65918
FLEET MANAGEMENT LED LIGHTING
-
75,000
75,000
65920
MBFD STATIONS SECURITY UPGRADES CW
-
126,000
126,000
66018
FLEET MANAGEMENT CONCRETE SPARING
100,000
-
100,000
66020
CITY HALL - MAIN ENTRANCE PAVERS
550,000
550,000
66118
FLEET MANAGEMENT BAYS PAINTING
-
120,000
120,000
66120
LINCOLN RD STONE RESTORATION
368,000
-
368,000
66220
HISTORIC CITY HALL ELEVATOR
320,000
320,000
66618
SOUTH POINTE PK -FIRE ALARM RENEWAL
35,000
35,000
66718
BEACH STORAGE AREA ENCLOSURE
170,000
170,000
66818
WATER STATION ROOF REPLACEMENT
30,000
30,000
66918
ANCHOR GAR. -FIRE ALARM REPLACEMENT
221,000
221,000
67018
ANCHOR GARAGE -STAIRWELL DOORS
27,000
27,000
67030
MARINE PATROL EXTERIOR RESTORATION
60,728
60,728
67200
FIRE STATION 3 FIRE ALARM UPGRADE
55,000
55,000
67220
FIRE STATION 3 EMERGENCY GENERATOR
110,000
110,000
67240
777 BUILDING HVAC 4TH FLOOR
162,121
162,121
67322
PARKING DECK CRACKS REPAIR
-
280,000
280,000
67360
BASS MUSEUM EMERGENCY GENERATOR
133,900
133,900
67422
EAST CHILLED WATER PIPING INSULATION
-
35,000
35,000
67518
1755 MERIDIAN AVE OFFICE SECURITY
35,000
35,000
Page 1121 of 1667
ATTACHMENT B
/\/i
, CITY OF MIAMI BEACH
;y 11""'t ��'�'' A 1 I AC fH FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY PROGRAM
PROJECT PROGRAM Previous Years FY 7022 FY 2023 FY 7024 FY 2025 FY 2026 Future Total
67522
CANAL PARK LANDSCAPING REPLACEMENT
40,000
40,000
67622
TERRAZZO FLOOR SCRUBBERS
40,0D0
40,000
67722
ENERGY CONSUMPTION MANAGEMENT INTEG
35,000
35,000
67822
CHILLER LINES FLUSHING
25,000
25,000
68122
FLEET 40 YEAR RE -CERTIFICATION
35,000
35,000
68222
FLEET ENHANCEMENTS PHASE II UPGRADE
150,000
150,000
68322
FLEET SECURITY CAMERAS
157,000
157,000
68422
FLEET WAREHOUSE WATERPROOFING AND ROOF REPAIR
-
145,000
145,000
68519
GO#48: POLICE HQ FACILITY
5,500,000
-
4,500,000
10,000,000
68522
FLEET GATE
-
51,000
51,000
68622
FLEET PARKING LOT RESURFACING
71,000
71,000
68720
POLICE HQ & PARKING GAR. FIRE ALARM
246,033
-
246,033
68760
CITY HALL ELECTRICAL UPGRADES
341,500
341,500
68820
BEACH RESTROOMS EXHAUST SYSTEMS
35,000
35,000
69220
PUBLIC WORKS FACILITY GENERATOR
391,177
391,177
69470
FLEET/SANITATION FIRE ALARM SYSTEM
85,800
85,800
22,743,170
3,719,000
11,964,000 200,000 Sul= 3,107,000
- 44,365;170
FA/Kf A6ML11fASi11Alf4ili'. .
61121
SCOTT RAKOW YOUTH CENTER -KITCHEN
-
-
150,000
150,000
65322
MIAMI BEACH GOLF CLUB LAKE AERATION
45,000
45,000
-
45,000
150,000
60022
FLAMINGO PARK NORTH -SOUTH WALKWAY
300,000
300,000
60121
BEACHVIEW FITNESS COURSE REPLACEMENT
146,000
146,000
60122
SOUNDSCAPE PK LED LIGHTING
75,000 -
75,000
60322
PARKS MAINT. FACILITY RENOVATIONS
- 335,000
335,000
60523
FLAMINGO FOOTBALL STADIUM RAILINGS
100,000 -
100,000
61219
N. SHORE TENNIS FACILITY FENCE
47,000
-
47,000
61319
N. SHORE BANDSHELL PLUMBING REPAIRS
30,000
-
30,000
62718
N. BEACH PARKS RESTROOM RESTORATION
190,000
91,000
281,000
63080
BEACH RESTROOMS PAINT AND CONCRETE
260,275
260,275
-63318
NORMANDY ISLE PARK POOL RENOVATIONS
64,000
358,000
422,000
66022
SOUTH POINTE PARK SPLASH PAD
249,000
249,000
66418
FLAMINGO POOL DECK & PUMP ROOM
-
334,000
334,000
Page 1122
of 1657
ATTACHMENT 0
CITY OF MIAMI BEACH
1 FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY PROGRAM :B E H
PROJECT PROGRAM Previous Years FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 Future Total
67040 NORMANDY ISLE PARK & POOL
200,000
1,800,000
200,000
67120 SOUNDSCAPE PARK IMPROVEMENTS
28,000
E,..,7777, 7777 777 77-
28,000
67420 FLAMINGO PARK POOL PLAYGROUND
245,584
-
245,584
68919 GO#52: LED LIGHTING IN PARKS
3,741,000
759,000
4,500,000
1,109,000
:9,w
m 669A00..7134
39
.77 7777
62423 SECURITY CAMERA BEACHWALK -MID BCH
890,000 890,000
1,780,000
62623 SECURITY CAMERA BEACHWALK - NORTH BCH
647,500 647,500
1,295,000
64922 NORTH BEACH OCEANSIDE PARK CCTV SEG
156,000
156,000
106AS10 :1,537i500.5 3,231,M
!A37, 00
64122 BOLLARDS INSTALLATION AND REPL. 200,000 302,500 502,500
60011 IRRIGATION SYSTEM MACARTHUR CAUSEWAY 28,000 26,000
65120 GREENSPACE FACILITY SECURITY SYSTEM - 110,000 110,000
66520 SOUTH BEACH ROW LANDSCAPE 280,000 300,000 100,000 680,000
65021 BELLE ISLE FAKK UUM]INU ENHANCEMENT .... . . I I u.Vw 110 -WL)
1 Owl 0, opow 0 1 PAW#11111 111. F., r�;:
65022 CONVENTION CENTER RUBBER WALLS AND 184,000 - 184,000
65023 CONV.CTR. EXHIBIT HALLS FIRE STROBE 300,000 300,000
65122 CONVENTION CENTER ADDITIONAL SECURITY CAMERA 250,000 - 250,000
4
34ADD 400AM0
28790 CONVENTION CENTER DR TO WASHINGTON
1,800,000
1,800,000
:3;008,"2.`:
3;OO1i;662
E,..,7777, 7777 777 77-
2
20220 SEAWALL -DICKENS AV SHORELINE
435,394
435,394
28300 SHANE WATERSPORT SEAWALL
784,000
784,000
29560 BRITTANY BAY PARK SEAWALL
1,109,000
1,109,000
Page 1123 of 1657
ATTACHMENT B
t� � CITY OF MIAMI BEACH
? v' Ll j�-A, �r E B E AC ! i FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY PROGRAM
PROJECT PROGRAM Previous Tears FY 2022 FY 2023 FY 2024 FY 2075 FY 2026 Futuro Total
f1N MOBIBOtMO ,.
..
105,140,819
23618 LENOX COURT & JEFFERSON AVE SEAWALL
300,000
300,000
27170 SEAWALL-BISCAYNE BAY ST END PH. II
1,694,058 -
1,694,058
27919 GO#39: SEAWALLS & SHORELINES
5,000,000 5,000,000
10,000,000
28740 SEAWALL - HOLOCAUST MEMORIAL
100,000 -
100,000
28780 SEAWALL DADE BLVD- WASHINGTON AVE
1,625,000
1,625,000
28820 INDIAN BEACH PARK SEAWALL
715,000 -
715,000
29020 CITYWIDE SEAWALL REHAB
10,000,000 5,000,000 5,000,000
20,000,000
29500 COLLINS CANAL ENHANCEMENT PROJECT
5,458,889 -
5,458,889
24,892,947 SAO m 101m,000 - -
- .. 39,892,947
20597
WEST AVENUE PHASE II
105,140,819
-
105,140,819 .
21118
STILLWATER ENTRANCE SIGN
-
225,000
225,000
21270
VENETIAN NEIGH. -ISLANDS
46,372,927
-
46,372,927
22050
BAYSHORE NEIGH. BID PACK A
25,085,154
25,085,154
23180
BAYSHORE NEIGH. BID PACK D
16,219,308
16,219,308
23270
CITY CENTER COMMERCIAL DISTRICT BPB
25,809,526
54,787,421 80,596,947
23380
PALM & HIBISCUS ISLAND ENHANCEMENT
50,217,165
- 50,217,165
27319
GO#31: OCEAN DRIVE CORRIDOR
2,000,000
18,000,000
20,000,000
27419
GO#32: PALM& HIBISCUS LANDSCAPING
1,000,000
1,000,000
28610
RUE VENDOME PUBLIC PLAZA
2,511,705
2,511,705
28940
BAYSHORE NEIGH. CENTRAL. SOUTH
21,777,204
21,777,204
29300
LINCOLN RD LENOX-COLLINS W/SIDE STR
40,000,000
-
40,000,000
29310
CONVENTION CNTR LINCOLN RD CONNECTOR
10,000,000
1,800,000
3,400,000
15,200,000
29530
COLLINS PARK ANCILLARY IMPROVEMENTS
4,000,000
4,000,000
69790
SUNSET 3 & 4 UTILITY PAYMENT
1,532,002
-
1,532,002
359,979,252
1,80Q000
21,625,000 -
- - 54,787,21 438,191,673
Imedlaw
8iY8L01h4N1'
65721
MXE LAND USE/MOB(LITY/ECONOMIC DEVELOPMENT
STUDY
190,000
1190,000)
Page 1124 of 1657
ATTACHMENT B
CITYOF MIAMI BEACH
,�,°�'1 BEACH
�� � /e.'_� �4''���4ti FY 2022 • 2026 CAPITAL IMPROVEMENT PLAN B7 PROGRAM
PROJECT PROGRAM Previous Years FY 2022 FY 3023 FY 2024 FY 2025 FY 2026 Futuro Total
20587 1 ST STREET-ALTON RD TO WASHINGTON 26,870,741 20,000,000 46,870,741
20607 11TH STREET -FLAMINGO NEIGHBORHOOD 7,602,460 7,602,460
Page 1125 of 1657
11111 AINAdL11Y'
20197
CITY CENTER RESILIENCY ENHANCEMENTS
1,000,000
1.000.000
66420
DADE BOULEVARD PEDESTRIAN PATHWAY
225,000
-
225,000
68219
GO#33: STREET TREE MASTER PIAN
2,500,000
2,500,000
5.000,000
3,723A00
- 2,5001m
6,225,=
PXCWW&nW IMANAGIMM
29880
LINCOLN RD MALL ADA PEDESTRIAN
87,500
87,500
65921
71 ST STREET BUSINESS CORRIDOR LIGHT
69,000
69,000
69620
S. BOWL SIGNAGE/ PAINTING/ LIGHTING
150,000
150,000
306,500
-
- - ...
306,500
fW
20922
NORMANDY ISLES DRAINAGE IMPROVEMENT
-
292,000,000 -
292,000,000
24020
ORCHARD PARK
250,000
- 13,688,421
13,938,421
24120
TOWN CENTER
-
96,000,000
-
96,000,000
24619
GO#37: SIDEWALK IMPROVEMENTS
5,200,000
3,900,000
3,900,000
13,000,000
27360
RESTORATIVE TREEWELL-PH A -SOUTH BCH
690,000
-
690,000
27519
GO#34: ABOVE GROUND IMPROVEMENTS
-
23,000,000
20,000,000
43,000,000
27619
GO#35: FLAMINGO PARK NEIGHBORHOOD
-
-
20,000,000
20,000,000
27819
GO#38:STREET PAVEMENT
5,800,000
12,100,000
12,100,000
30,000,000
28050
EVERGLADES COURT ALLEYWAY PAVING
300,000
300,000
28119
GO#41: LA GORCE NEIGHBORHOOD
-
14,000,000
14,000,000
28219
GO#44: NORTH SHORE NEIGHBORHOOD
-
-
6,000,000
8,000,000
28719
GO#53: SECURITY FOR PUBLIC SPACES
2,000,000
2,350,000
-
4,350,000
29810
ALLEYWAY RESTORATION PH III
532,500
100,000
632,500
61117
RESTORATIVE TREE WELL TREATMENT
292,000
292,000
15,064,500
- 137ASOA00
292AOOA00 91, 88A21
536,202,921
PW
20078
CITYWIDE STREET PAVEMENT
15,000,000
15,000,000
20177
OCEAN DR. EXTENDED SIDEWALK PROJECT
164,650
-
164,650
20250
LAGORCE ISLAND -LIGHTING TREES MISC
66,376
-
66,376
20422
FLAMINGO NEIGHBORHOOD
300,000
214,000,000
214,300,000
20522
NAUTILUS NEIGHBORHOOD
-
29,486,421
29,486,421
20587 1 ST STREET-ALTON RD TO WASHINGTON 26,870,741 20,000,000 46,870,741
20607 11TH STREET -FLAMINGO NEIGHBORHOOD 7,602,460 7,602,460
Page 1125 of 1657
ATTACHMENT B
I a' 4J' �ll�kil1�yh� I � �, f���^'�'q°°°, E AL ,�., H CITY MIAMI BEACH
AC FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY PROGRAM
PROJECT
PROGRAM
Previous Years FY 2022 FY 2023
FY 2024 FY 2025 FY 2026 Future
Total
23220
NORTH SHORE NEIGH. IMPROVEMENTS
7,339,268 - -
- - 60,127,421
67,466,689
23240
LA GORCE NEIGHBORHOOD IMPROVEMENTS
2,267,141
80,000,000
82,267,141
23300
FLAMINGO NEIGHBORHOOD -SOUTH
7,478,640
-
7,478,640
23360
WEST AVE/BAY RD NEIGH.
25,902,873
25,902,873
29320
17TH STREET NORTH IMPROVEMENTS
2,000,000
2,000,000
60237
COLLINS / HARDING ALLEY RESTORATION
100,000
100,000
::::aanno�_saa' 9eYfenlfnn :., � "',
_ r; ." 3AZr'R79:@62
dQ®.XOS_09t
29760
RESTORATIVE TREEWELL-PH 3
683,911
683,911
61619
NORTH BEACH ROW LANDSCAPING
270,000 - 300,000 100,000
670,000
62019
MIDDLE BEACH ROW LANDSCAPE
90,285 136,000 300,000 150,000
676,285
63521
RESTORATIVE TREE WELL CITYWIDE
- - 480,000 240,000
720,000
64119
INDIAN CREEK LANDSCAPE & IRRIGATION
1,200,000 - -
1,200,000
2244,146 136;Q00 1,0130,000 499tm 3,950;1:95
25650 CITYWIDE CURB RAMP INSTALLATION 112,560 112,560
26700 ROW IMPROVEMENT PROJECT 1,844,084 1,844,084
27719
GO#36: WASHINGTON AVE. CORRIDOR
1,000,000 9,000,000
10,000,000
28019
GO#40: Al ST. CORRIDOR
1,500,000 13,500,000
15,000,000
28630
BONITA DRIVE STREET END IMPROVEMENT
135,000
135,000
-`2,7351000 _ Z2�OQ.OGO 25 ;M
21319
ROYAL PALM AVE & 46TH STREET CIRCLE
107,000 (107,000)
_
27910
MERIDIAN AVE SHARED USE PATH
278,000 756,000 -
1,034,000
62222
WEST AVENUE BICYCLE LANES PHASE II
- 131,000 533,072
664,072
62322
ORCHARD PARK TRAFFIC CALMING
245,505 1,473,867
1,719,372
62617
72ND STREET PROTECTED BIKE LANE
519,000 - -
519,000
90!1.000 1.023;505 2Aws:9•:3 936A44
Page 1126 of 1657
ATTACHMENT B
62940 CITYWIDE PARKING LOT LIGHTING
450,000
450,000
CITY OF MIAMI BEACH
1��•,,1�`t
F`^`�, f R
C � �
FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY PROGRAM
'
64918 SMART LIGHTING MASTER PLAN
a�
1,200,000 600,000 600,000 4,863,695
PROJECT
PROGRAM
6,500,000 - 10,000,000
Previous Years FY 2072 FY 2023 FY 2024 FY 2025 FY 2026 Futuro Total
62940 CITYWIDE PARKING LOT LIGHTING
450,000
450,000
470,000
1,115,625
- - - 1,115,625
P1N ADIfHNIfTRAIlON
- 980,000
'
64918 SMART LIGHTING MASTER PLAN
2,463,895
1,200,000 600,000 600,000 4,863,695
69019 GOA55: STREET LIGHTING IMPROVEMENTS
3,500,000
6,500,000 - 10,000,000
275,000
5,963,895
7,700,000 60 AN 60DAM 14,863,695
P.WfN4tii
20018 ADAPTIVE TRAFFIC SIGNAL CONTROLS
21218 5TH STREET FLYOVER LIGHTING
148,779
148,779
20118 BAYSHORE NEIGH. TRAFFIC CALMING I
378,075
27800 STREET LIGHTING IMPROVEMENTS
996,305
629,000 50,000,000 51,625,305
27940 EUCLID AVE. - FROM 17TH ST 8 5TH ST
470,000
470,000
'980,000
- -
- 980,000
20521 JULIA TUTTLE ENTRANCE SIGN
275,000
275,000
VU100POWAY M
20018 ADAPTIVE TRAFFIC SIGNAL CONTROLS
- 1,800,000
1,800,000
20118 BAYSHORE NEIGH. TRAFFIC CALMING I
378,075
378,075
20200 TRANSPORTATION CAPITAL INITIATIVE
42,492,028
42,492,028
20218 NAUTILUS TRAFFIC CALMING PHASE I
355,500
355,500
20221 16TH STREET PROTECTED BIKE LANES
-
90,000 560,000
650,000
20318 VENETIAN ILLUMINATED CROSSWALKS
180,000
180,000
20617 NEW BUS SHELTER DESIGNS
504,251
504,251
20620 LA GORCE / PINE TREE DR BIKE LANES
230,000 1,570,000
1,800,000
20718 SIGNALIZATION ALTON RD AND 4TH ST
580,000
- -
580,000
20818 ROYAL PALM NEIGHBORHOOD GREENWAY
430,000
-
430,000
21014 BICYCLE LANES/SHARED USE PATH IMPROVEMENTS
130,000
844,247 1,980,000
2,954,247
21419_ _MERIDIAN.AVENUE.PEDESTRIAN CROSSING
_ 410,000
-
410,000
21522 ALTON ROAD SHARED USE PATH PHASE II
3,631,000
3,631,000
22518 ENHANCED CROSSWALKS
480,000
-
480,000
Page 1127
of 1657
ATTACHMENT B
CITY OF MIAMI BEACH
} •,b, y �� )'�/ I FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY PROGRAM
PROJECT PROGRAM Previous Years FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 Futuro Total
23020
ALTON RD & 16TH STREET INTERSECTION
540,000
20124
ALLISON ISLAND NORTH
540,000
27860
51 ST STREET NEIGHBORHOOD GREENWAY
50,000
29,147,027
29,147,027
20323
50,000
28080
INTELLIGENT TRANSPORT SYSTEM
18,776,260
BELLE ISLE
4,550,621
4,550,621
18,776,260
60177
SOUTH BEACH PEDESTRIAN ZONES
950,000
20524
BISCAYNE POINT
13,266,321
950,000
60222
NORTH BEACH GREENWAYS PHASE III
-
7,963,400
150,000
1,170,220
1,320,220
60257
BAY DRIVE NEIGHBORHOOD GREENWAY
100,000
100,000
60327
10TH STREET NEIGHBORHOOD GREENWAY
190,000
224,000
1,080,000
1,494,000
62517
MERIDIAN AVENUE BICYCLE LANES
250,000
-
-
250,000
62521
NORTH BEACH GREENWAYS- PHASE II
604,230
110,000
714,230
62717
73RD STREET PROTECTED BIKE LANES
239,000
-
-
239,000
64190
ENTRANCE SIGNS TO NORTH BEACH
58,000
600,000
91,000
831,679
1,580,679
65221
PINE TREE DRIVE AND 46TH STREET
603,603
-
-
603,603
65321
PRAIRIE AVENUE AND 44TH STREET/CHAS
84,420
520,000
604,420
65518
JEFFERSON AVE & 15TH ST BEACONS
74,200
-
74,200
66122
INDIAN CREEK DRIVE PROTECTED BIKE
-
131,000
131,000
66222
71 ST STREET BRIDGE BIKE LANES
100,000
-
100,000
68419
GO#42: TRAFFIC CALMING
1,500,000
-
500,000
2,000,000
68619
GO#43: BIKE LANES & SHARED USE PATH
2,500,000
2,500,000
5,000,000
69820
NORTH BEACH GREENWAYS PHASE 1
448,625
448,625
72,710,192
1,971,000
4,969,247
4,631,899 1,9!0000 3A31,000
- 91,621,330
20824 PARK VIEW ISLAND 4,759,121 4,759,121
Page 1128 of 1657
20124
ALLISON ISLAND NORTH
6,154,321
6,154,321
20224
NORMANDY SHORES
29,147,027
29,147,027
20323
LA GORCE ISLAND
9,104,921
9,104,921
20324
BELLE ISLE
4,550,621
4,550,621
20424
BISCAYNE BEACH
20,445,421
20,445,421
20524
BISCAYNE POINT
13,266,321
13,266,321
20624
CENTRAL BAYSHORE
7,963,400
7,963,400
20724
INDIAN CREEK PARKWAY
9,217,121
9,217,121
20824 PARK VIEW ISLAND 4,759,121 4,759,121
Page 1128 of 1657
ATTACHMENT B
CITY OF MIAMI BEACH
/\A 1 A AIB H FY 2022 - 2026 CAPITAL IMPROVEMENT PLAN BY PROGRAM
PROJECT PROGRAM Previous Years FY 2022 FY 2023 FY 2014 FY 1025 FY 1026 Futuro Total
20924
STAR ISLAND
6,032,621
6,032,621
21122
SUNSET ISLAND 1
5,319,421
5,319,421
21222
SUNSET ISLAND 2
7,446,121
7,446,121
22320
LAKEVIEW NEIGHBORHOOD IMPROVEMENTS
41,000,000
41,000,000
22418
MT. SINAI STORMWATER PUMP STATION
19,727,421
19,727,421
60319
WATER METER REPLACEMENT PROGRAM
16,104,893
-
-
- -
-
16,104,893
60419
DERM $ EPA CONSENT DECREE
1,400,000
500,000
2,800,000
2,800,000
2,800,000 2,800,000
13,100,000
65421
VALVE REPLACEMENT PROGRAM
931,635
1,859,853
-
-
-
2,791.488
12,436,328
2,339,833
2A=,=
21800A00
21900A00 2A =A=
184,133,638
216,130,239
20527
FDOT UTILITIES RELOCATION
1,077,529
1,500,000
17,000,000
19,577,529
20619
WASTE WATER STATIONS REHABILITATION
11,103,400
2,870,733
2,339,267
-
16,313,400
20719
SCADA AND PLC SYSTEMS
7,238,000
7,238,000
21220
INDIAN CREEK STREET DRAINAGE IMP.
22,308,926
22,308,926
21720
DRAINAGE SYSTEM WATER QUALITY PILOT
500,000
500,000
23000
SUNSET HARBOUR PUMPSTATION UPGRADES
28,275,370
28,275,370
27370
541N DIAMETER REDUNDANT SEWER FORCE
17,644,487
-
-
17,644,487
28120
WATER PUMP STATIONS IMPROVEMENTS
5,595,000
2,595,937
2,115,063
-
10,306,000
28220
WASTEWATER MANHOLE REHABILITATION
3,045,000
1,592,000
1,639,091
1,688,263
7,964,354
28320
SEWER PUMP STATION ODOR CONTROL
850,600
850,600
28420
SWR PUMP STATION ti 18 IMPROVEMENTS
1,400,000
-
-
-
1,400,000
28520
WATER & WASTEWATER MAINS AND REHAB
26,417,709
7,833,710
21,823,162
15,268,653
71,343,234
28920
BIOSWALE PILOT PROJECT
850,000
-
-
850,000
29820
STORM WATER OUTFALLS
2,000,000
-
2,000,000
126,306,021
16,392,379
27,916,384
33,936,916
-
-
206,371,900
TRANSPORTATION.
22018
FIBER COMMUNICATIONS INSTALLATION
TOTAL 1
GRANDTOTAL:
292,000
147,102,549:00000
1,693,228,914
-
69,838,737
383,111,370
61,470,985
2,800,0001
310,332,100 15,362,000
184,133,8581
792,053,542
292,000
423,062,139
3,326,397,648
Page 1129 of 1657