R9 C - Ocean Drive Alternatives 10-26-2021 (3)Ocean Drive
SHORT-TERM RECONFIGURATION OPTIONS
October 27, 2021 City Commission Meeting
1
Goals
•Safety
•Business Friendly
•Elevated Resident/Visitor
Experience
•Avoid Congregation
2
Ocean Drive Option 1
One Way Southbound Traffic
5th Street to 15th Street
•Sidewalk cafés return to west sidewalks
and parklets remain under reduced footprint
•One-way southbound vehicular traffic
•Valet and freight loading zones on west
side where no parklet exists
•Two-way buffered bike lanes on east side
•Easily convertible to Freebee operation
•Implementation cost for striping and
continuous green paint –$167,000
•Potential recurring cost for striping maintenance -$20,000
PA
R
K
L
E
T
/
V
A
L
E
T
/
F
L
Z
(
8
’
)
3
SB
T
R
A
V
E
L
L
A
N
E
(
1
3
.
5
’
)
BU
F
F
E
R
(
5
’
)
2 -WA
Y
B
I
K
E
L
A
N
E
(
1
1
.
5
’
)
N
SD
W
K
C
A
F
É
(
8
.
5
’
)
WE
S
T
S
D
W
K
(
6
’
)
EA
S
T
S
D
W
K
(
1
0
.
5
’
)
Ocean Drive Option 2
Freebee/Pedestrianized Option
•Sidewalk cafés on west sidewalk and parklets remain under reduced footprint
•Freebee operation: 8 vehicles for 12 hrs a day/365 days a year would cost $920,000 per year
•Includes aesthetic improvements to the 100 blocks
•Operational challenges in the 100 blocks will remain
•Implementation cost: $356,000*
•Recurring cost: $990,000**
*Assumes installation of planters on side streets and installation of automatic gate arms for emergency access.
**Includes operation costs of Freebee, maintenance of planters, and minor maintenance of pavement markings
PA
R
K
L
E
T
S
(
8
’
)
4
FR
E
E
B
E
E
L
A
N
E
(
1
3
.
5
’
)
N
BU
F
F
E
R
(
5
’
)
BI
K
E
L
A
N
E
(
1
1
.
5
’
)
SD
W
K
C
A
F
É
(
8
.
5
’
)
WE
S
T
S
D
W
K
(
6
’
)
EA
S
T
S
D
W
K
(
1
0
.
5
’
)