Loading...
City-Commission-Meeting-Presentation-12.8.21GO#45: FIRE STATION 1 City Commission Meeting December 8, 2021 www.GOMBInfo.com PROJECT BACKGROUND 2 The existing Fire Station 1 building at 1051 Jefferson Avenue: •...has outlived its useful life as a fire station and is obsolete for the current and future needs of the MBFD. •...does not meet National Fire Protection Association (NFPA) standards that are needed for building certification. •...sits 2.5 feet below FEMA base flood elevation (BFE) standards and is extremely vulnerable to flood events. •...is not built to sustain major storm conditions and therefore must be vacated in advance of a hurricane. •...has the highest vulnerability rating amongst all public safety facilities within the City of Miami Beach. •...has mechanical, electrical and plumbing systems that continue to fail, even with constant repairs. •...has limited access for emergency vehicles to efficiently enter and exit apparatus garage bays. •...is too small to fit critical equipment, including ladder trucks that are necessary to respond to high rise condos and hotels. •...does not accommodate the parking that is needed for MBFD personnel. WHY IS A NEW FIRE STATION NEEDED? 3 4 Project site selection criteria: 1.SERVICE: Centrally located within the service area 2.SIZE: Property size larger than 3/4 of an acre to allow for onsite parking for personnel and space for access ramps 3.ACCESS:2 adjacent roadways for vehicular access 4.TIME:No major impediments that can negatively impact response times 5.COST:Financially feasible PROJECT SITE SELECTION WHERE CAN A NEW FIRE STATION GO? 5 PROJECT SITE SELECTION City Owned Existing FS1 site -------------------------------------1051 Jefferson Avenue --------------------------------Size; Access Flamingo Park green space -----------------------Michigan Avenue & 13 Street -----------------------Size, Access P10 parking lot --------------------------------------Michigan Avenue & 15 Street -----------------------Service; Access P9 parking lot ----------------------------------------Adjacent to the PAL on 11 Street -------------------Access; Other Dog park -----------------------------------------------Washington Avenue & 2 Street ----------------------Service; Size, Time Non-City Owned Mixed use commercial property ----------------727 Collins Avenue---------------------------------------Service; Size; Access; Time; Cost Commercial office building -----------------------960 Alton Road--------------------------------------------Service; Size; Time; Cost Multifamily property -------------------------------835 -855 Alton Road------------------------------------Service; Size; Time; Cost Commercial property ------------------------------749 –755 Washington Avenue-----------------------Service; Size; Time; Cost Inactive construction site -------------------------419 Michigan Avenue --------------------------------Size; Cost 2 lots owned by South Bay Club Condos -----West Avenue & 8 Street ----------------------------Service; Cost Lot owned by Federation Towers ---------------Alton Road & 8 Street --------------------------------Service; Size; Time; Cost 2 lots owned by South Beach Heights ---------Alton Road & 7 Street --------------------------------Service; Size, Time;Cost Gas station -------------------------------------------Michigan Avenue & 5 Street ------------------------Size; Time; Cost Parking lot -------------------------------------------515 Jefferson Avenue ---------------------------------Size; Access; Cost Gas station -------------------------------------------Jefferson Avenue & 5 Street ------------------------Size; Time; Cost Sites Locations Issues WHICH LOCATIONS HAVE BEEN CONSIDERED? 7 PROJECT SITE SELECTION 6 Existing FS1 –1051 Jefferson Avenue Future FS1 –833 6 Street Service Area Response Time Maps –Side by Side 7 Based on 2020 Census Data: •Approximately 1,600 more residents within the 2 min. response time •Approximately 785 more residents overall 4 minutes 6 minutes2 minutesResponse time: 8Existing FS1 –1051 Jefferson Avenue Future FS1 –833 6 Street New Commercial Development Since 2010 8 Facts about the South Shore Community Center •1 acre property, adjacent to three adjacent roadways •Located 4 blocks south of current Fire Station •Building is more than 3 feet below FEMA base flood elevation (BFE) requirements and is vulnerable to flooding •Building contains architectural elements that create hiding places for loitering •The Historic Preservation Board voted to maintain the building’s Non-Contributing classification on September 13, 2021 SOUTH SHORE COMMUNITY CENTER, EXISTING SITE P-11 PARKING LOT, 27 spaces ME R I D I A N C T 9 SOUTH SHORE COMMUNITY CENTER 833 6TH STREET 6TH STREET JE F F E R S O N A V E N U E ME R I D I A N A V E N U E PROPOSED SITE PLAN Site Plan / Ground Floor •Pedestrian access through entrance plaza from 6 Street •Maintains vehicular access for Meridian court and public surface parking lot, P-11 •Provides secured parking below apparatus bay for fire station staff •Maximizes green space •Public access for watch office services •Secured circulation for fire station staff 34 Fire Parking spaces 14 Public Parking spaces 10 Entrance Plaza 6th Street Submit Design for Historic Preservation Board (HPB) Review Present Design to G.O. Bond Oversight Committee City Commission to set Public Hearing on Development Waivers Present to Community at Virtual Public Meeting Present to City Commission at Public Hearing on Development Waivers Present to Flamingo Park Neighborhood Association (FPNA) Present Design to Historic Preservation Board (HPB) Guaranteed Maximum Price (GMP) 9/20/21 9/23/21 9/30/21 12/08/2110/05/21 11/01/21 12/13/21 11 PROJECT TIMELINE •Waivers of Development Regulations -City Commission (Public Hearing on December 8, 2021) •Certificate of Appropriateness for Demolition -Historic Preservation Board Advisory Recommendation -Approval by City Commission •Design –Historic Preservation Board –Binding Authority on Site Plan and Building Design •Construction Guaranteed Maximum Price (GMP) -City Commission Required Project Approvals: December 2022 THANK YOU www.miamibeachfl.gov/FS1 www.GOMBInfo.com 12