Loading...
HomeMy WebLinkAboutOrdinance 2022-4459 10-Year Water Supply Facilities Work Plan and Property Rights Element- Comprehensive Plan Amendment ORDINANCE NO. 2022-4459 AN ORDINANCE OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, AMENDING THE 2040 COMPREHENSIVE PLAN, PURSUANT TO THE EXPEDITED STATE REVIEW PROCESS OF SECTION 163.3184(3), FLORIDA STATUTES, BY .....—-... -- T'-'� aapcen �Ch�T 6 w ern I ICG A hln nr_�� CAS ENT ' -0 =GG I&kTC CREATING A sai��-�-a—sue �T�.-.o.�� PROPERTY RIGHTS ELEMENT, INCORPORATING GOALS, OBJECTIVES, AND POLICIES AS REQUIRED BY SECTION 163.3177(6)(1), FLORIDA STATUTES; AND AMENDING THE "INFRASTRUCTURE ELEMENT" AND "CAPITAL IMPROVEMENT ELEMENT" TO INCORPORATE AN UPDATED 10- YEAR WATER SUPPLY FACILITIES WORK PLAN AND RELATED POLICIES, AND STRENGTHEN COORDINATION BETWEEN WATER SUPPLY AND LOCAL LAND USE PLANNING AS REQUIRED BY SECTION 163.3177(6)(c)(3), FLORIDA STATUTES; AND PROVIDING FOR INCLUSION IN THE COMPREHENSIVE PLAN, TRANSMITTAL, REPEALER, SEVERABILITY, AND AN EFFECTIVE DATE. WHEREAS, in 2021, the Florida Legislature amended Section 163.3177(6), Florida Statutes, to require that local governments adopt a property rights element; and WHEREAS, the City of Miami Beach (the "City") respects judicially acknowledged and constitutionally protected private property rights; and WHEREAS, Section 163.3167(9), Florida Statutes, requires each local government to address in'its comprehensive plan, the water supply sources necessary to meet and achieve the existing and projected water use demand for an established planning period; and WHEREAS, Section 163.3177(4)(a), Florida Statutes, requires coordination of the local comprehensive plan with the water management district's regional water supply plan; and WHEREAS,the City recognizes the need for better integration between land use planning and water supply planning; and WHEREAS, Section 163.3177(6)(c), Florida Statutes, requires that local governments prepare and adopt a 10-Year Water Supply Facilities Work Plan and amend their comprehensive plans within 18 months after the water management district approves or updates a regional water supply plan; and WHEREAS, on October 27, 2010, the City Commission adopted Ordinance No. 2010- 3704, amending the Comprehensive Plan to strengthen coordination between water supply and local land use planning and incorporating a 10-Year Water Supply Facilities Work Plan; and WHEREAS, on November 8, 2018, the South Florida Water Management District ("SFWMD") Governing Board approved the Lower East Coast Water Supply Plan Update to Page 1 of 7 ensure there will be enough drinking water for more than 6 million residents in South Florida's Lower East Coast Region; and WHEREAS, local governments are required to revise their Comprehensive Plan to include their updated Water Supply Facilities Work Plan within 18 months after the date the Regional Water Supply Plan Update is adopted; and WHEREAS, the City has proposed an updated 10-Year Water Supply Facilities Work Plan, consistent with the 2018 Lower East Coast Water Supply Plan Update; and WHEREAS, the City has proposed amendments to the policies of the Comprehensive Plan for consistency with the updated 10-Year Water Supply Facilities Work Plan; and WHEREAS,the City Commission hereby finds that the adoption of this Ordinance is in the best interest and welfare of the residents of the City; and WHEREAS, the City Commission hereby adopts the updated 10-Year Water Supply Facilities Work Plan as supporting data and analysis for the Comprehensive Plan amendments; and .WHEREAS, the City Commission also finds the proposed 10-Year Water Supply Facilities Work Plan and proposed amendments to its Comprehensive Plan to be in compliance with and consistent with Florida law and the City's adopted Comprehensive Plan; and WHEREAS, these regulations will ensure that the public health, safety and welfare will be preserved in the City; and WHEREAS, the amendments set forth below are necessary to accomplish the objectives identified herein. NOW THEREFORE BE IT ORDAINED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, THAT: SECTION 1. The following amendments to the City's 2040 Comprehensive Plan Resilient Land Use and Development Element are hereby adopted: RESILIENT LAND USE AND DEVELOPMENT ELEMENT The Resilient Land Use and Development Element (RLU) of the Comprehensive Plan serves as a guide for future land development and redevelopment in a manner consistent with the City's vision of a vibrant and resilient Miami Beach, and the requirements of the Florida Statutes. The Principles, Goals, Objectives and Policies in the Resilient Land Use and Development Element are closely interrelated to most, if not all other elements in this Comprehensive Plan. Its function is to define future land uses and set their location, and to draw upon the core principles within the Comprehensive Plan to help ensure that growth is directed in a manner that is resilient, sustainable, supported by essential services, and improves the quality of life of the City and its residents. Riqhts Page 2 of 7 GOAL RLU 1: LAND USE Preserve and enhance the character of Miami Beach and its quality of life through the implementation of future land use and land development requirements that maximize the potential for economic benefit and the enjoyment of natural and man-made resources, while minimizing the threat to health, safety and welfare posed by hazards, nuisances, incompatible land uses and environmental degradation. QBJ EGT=!V-EE I c. ��n�C�Ty �If�LITQ SECTION I The following amendments to the City's 2040 Comprehensive Plan are hereby adopted: PROPERTY RIGHTS ELEMENT The City will respect judicially acknowledged and constitutionally protected private property rights. POLICY PRE 1.1.1 The City will consider the following rights in local decision-making: 1. The right of a property owner to physically possess and control his or her interests in the Property, including easements, leases, or mineral rights. 2. The right of a property owner to use, maintain, develop, and improve his or her property for personal use or for the use of any other person, subiect to state law and local ordinances. J Page 3 of 7 f 3. The right of the property owner to privacy and to exclude others from the property to protect the owner's possessions and property. 4. The right of a property owner to dispose of his or her property through sale or gift. SECTION 3. The following amendments to the City's 2040 Comprehensive Plan Infrastructure Element are hereby adopted: INFRASTRUCTURE ELEMENT GOAL INF 1: PROVISION OF INFRASTRUCTURE OBJECTIVE INF 1.1: PRIORITIES POLICY INF 1.1.3 The potable water network is an interconnected, countywide system, therefore, the City will cooperate with MDWASD to jointly develop methodologies and procedures for biannually updating estimates of system demand and capacity, and ensure that sufficient capacity to serve development exists. The City will prepare and submit a Water Conservation Plan to the County at the same time as the City submits the updated 510-Year Water Supply Facilities Work Plan. OBJECTIVE INF 1.5: LEVEL OF SERVICE STANDARDS POLICY INF 1.5.1 The following City-wide Level of Service Standards shall be used as the basis for determining the availability of facility capacity for residential uses; the systems shall be able to provide/accommodate at least the minimums specified: Facility/Service Area Level of Service Standard Sanitary Sewer Facilities Sewage Generation Standard 140 Average gallons per capita per day Solid Waste Facilities Solid Waste Generation Standard 1.275 tons per capita per year Drainage Facilities Design Storm Standard per Storm Water Master Plan as updated from time to time. Page 4 of 7 Potable Water Facilities Water Consumption Standard 2-4 156 Average gallons per capita per day The average gallons per capita rate applies to the year-round standard, while the peak gallons per capita rate applies to the City during peak tourist period due to the significant seasonal influx of temporary residents. The City uses a multiplier of 1.2,which gives a 20% increase in population to estimate required services and facilities. The following City-wide Level of Service Standards shall be used as the basis for determining the availability of facility capacity for non-residential uses; the systems shall be able to provide/accommodate at least the minimums specified: Hotel: 75 gallons per day per room Office: 0.084 gallons per day per square foot Retail: 0.18 gallons per day per square foot Industrial: 0.084 gallons per day per square foot Restaurant: 65 gallons per day per seat School: 12 gallons per day per student OBJECTIVE INF 1.8: WATER SUPPLY PLANNING POLICY INF 1.8.1 The Gity Will G9FRPIY With the "Gity ef Miami BeaGh, FleFida 10 yeaF WateF Supply FaGilities vveFk plaR," adopted GR tE)beF27th, 2010, 61nh weFk plan into the AAiami Reaoh Ge mnroheRsive ohn. The City hereby adopts by reference the "City of Miami Beach, Florida 10- year Water Supply Facilities Work Plan," dated May 7, 2021 (Work .Plan), into the City's Comprehensive Plan, for a planning period of not less than 10 years. This Work Plan addresses issues that pertain to water supply facilities and requirements needed to serve current and future development within the City. POLICY INF 1.8.2 Coordinate appropriate aspects of its comprehensive plan with the South Florida Water Management District's regional water supply plan approved adepted November 8, 2018. and with , and as updated-.-The City shall amend its Comprehensive Plan and Work Plan as required to provide consistency with the District and County plans. * POLICY INF 1.8.6 The City hereby adopts by reference the "Draft Miami-Dade Water and Sewer Department 10- Year Water Supply Facilities Work Plan," dated October 2020, for a planning period of not less than 10 years. This Work Plan addresses issues that pertain to water supply facilities and requirements needed to serve current and future development within the City's water service area. The City shall review and update the Work Plan at least every 5 years, within 18 months after the Governing Board of the water management district approves an updated regional water supply Page 5 of 7 r Plan. Any changes affecting the Work Plan shall be included in the annual Capital Improvements Plan update to ensure consistency between the Potable Water Sub-Element and the Capital Improvements Element. OBJECTIVE INF 1.9 POLICY INF 1.9.7 The City will continue to coordinate with Miami-Dade Water-and- -Sewer Depart,,en County DERM related to leak detection and repair of water lines throughout the City. SECTION 4. The following amendments to the City's 2040 Comprehensive Plan Capital Improvement Element is hereby adopted: CAPITAL IMPROVEMENTS ELEMENT OBJECTIVE CIP 1.5: LEVEL OF SERVICE STANDARDS POLICY CIP 1.5.3 The City shall continue to maintain and provide potable water, sanitary sewer, solid waste disposal and drainage facilities at adopted level of service standards to ensure that adequate facility capacity is available for proposed and existing commercial and residential developments within its jurisdiction. These level of service standards are established in this PlaR's InfFastF +„re g'�t Policy INF 1.5.1. SECTION 5. The 2040 Comprehensive Plan is hereby amended to replace the 10-Year Water Supply Facilities Work Plan dated October 6, 2010, and adopted pursuant to Ordinance No. 2010-3704, with the 10-Year Water Supply Facilities Work Plan, attached hereto as "Exhibit A". SECTION 6. INCLUSION IN THE COMPREHENSIVE PLAN. It is the intention of the City Commission that this Ordinance be entered into the Comprehensive Plan of the City of Miami Beach, FL, and it is hereby ordained that the sections of this Ordinance may be renumbered or re-lettered to accomplish such intention; and that the word "ordinance" may be changed to "section," "article," or other appropriate word. SECTION 7. TRANSMITTAL. The Planning Director is hereby directed to transmit this ordinance to the appropriate state, regional and county agencies as required by applicable law. Page 6 of 7 SECTION 8. REPEALER. All Ordinances or parts of Ordinances in conflict herewith be and the same are hereby repealed. SECTION 9. SEVERABILITY. If any section, subsection, clause or provision of this Ordinance is held invalid, the remainder shall not be affected by such invalidity. SECTION 10. EFFECTIVE DATE. If the amendment is not timely challenged, this amendment shall take effect 31 days after the state land planning agency notifies the City that the plan amendment package is complete pursuant to Section 163.3184(3), Florida Statutes. PASSED AND ADOPTED this do day of 7Gn�G`j' 12022. ATTEST: Dan Gelber, Mayor JAN 2 5 2022 Rafael E. Granado, City Clerk ♦\\\11111 N.... First Reading: October 13, 2021 Second Reading: anuary 20 20 2 It!CCF,PuDR.,\T'tD Verified By: Thomas R. Mooney, ICP Planning Director APPROVED AS TO FORM AND LANG AGE AND FOR EXECUTION 1 - 10 -Z2 City Attorney Date T:\Agenda\2022\1_January 2022\Planning\Water Supply Facilities and Property Rights Comp Plan Amednment - 2nd Reading ORD.docx Page 7of7 Ordinances-R5 A MIAMI BEACH COMMISSION MEMORANDUM TO: Honorable Mayor and Members of the City Commission FROM: Alina T. Hudak, City Manager DATE: January 20, 2022 10:05 a.m. Second Reading Public Hearing SUBJECT: 10-YEAR WATER SUPPLY FACILITIES WORK PLAN AND PROPERTY RIGHTS ELEMENT-COMPREHENSIVE PLAN AMENDMENT AN ORDINANCE OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, AMENDING THE 2040 COMPREHENSIVE PLAN, PURSUANT TO THE EXPEDITED STATE REVIEW PROCESS OF SECTION 163.3184(3), FLORIDA STATUTES, BYA; ENDI G THE "RESIL1SENT LAND USE AND DEVELOPMENT ELEMENT-," O r'�€ CREATING A PROPERTY RIGHTS ELEMENT, INCORPORATING GOALS, OBJECTIVES, AND POLICIES AS REQUIRED BY SECTION 163.3177(6)(1), FLORIDA STATUTES; AND AMENDING THE "INFRASTRUCTURE ELEMENT" AND "CAPITAL IMPROVEMENT ELEMENT" TO INCORPORATE AN UPDATED 10-YEAR WATER SUPPLY FACILITIES WORK PLAN AND RELATED POLICIES AND STRENGTHEN COORDINATION BETWEEN WATER SUPPLY AND LOCAL LAND USE PLANNING AS REQUIRED BY SECTION 163.3177(6)(C)3, FLORIDA STATUTES; PROVIDING FOR INCLUSION IN THE COMPREHENSIVE PLAN, TRANSMITTAL, REPEALER, SEVERABILITY, AND AN EFFECTIVE DATE. RECOMMENDATION The Administration recommends that the City Commission adopt the Ordinance. BACKGROUND/HISTORY On July 28, 2021, the City Commission referred the proposed Ordinance to the Planning Board (item C4 O). ANALYSIS PLANNING ANALYSIS Pursuant to Florida Statue Chapter 163, the Public Works Department has updated the City's 10-year Water Supply Facilities Wont Plan (WSP). Pursuant to the requirements of Chapter 163, the City is required to amend the 2040 Comprehensive Plan to include this update to the WSP. Planning and Public Works staff have drafted the portion of the proposed Comprehensive Plan Page 570 of 1313 Amendment related to the implementation of the WSP. The amendment updates the WSP that was previously adopted on October 27, 2010 with a new WSP (See "Exhibit A"). Public Works has already obtained cursory reviews from the South Florida Water Management District (SFWMD) and Miami-Dade County Water and Sewer Department (MDWASD) and those comments have been addressed in the attached draft of the WSP. Additionally, the City has been advised by the Florida Department of Economic Opportunity (DEO) that the statutory provisions in Chapter 163, related to comprehensive plans, were recently amended to require each local government in the State to adopt a 'property rights element'into their comprehensive plan. Specifically, under House Bill 59, which was signed into law on June 29, 2021 and became effective on July 1, 2021, local governments must adopt a property rights element into their comprehensive plan. This new element must be adopted by the earlier of the date of adoption of the next proposed comprehensive plan amendment, or the date of the next scheduled evaluation and appraisal (EAR) of its comprehensive plan. This property rights element is intended to protect private property rights and to ensure they are considered in local decision-making. Since the City adopted its most recent EAR in 2018, any amendment to the comprehensive plan adopted after July 1, 2021, must include a property rights element. The failure to include a property rights element will result in any future amendments being returned to the City until the required element is included. As such, proposed amendment includes goals, objectives, and policies (GOPs)to address the requirements of the House Bill 59. Water Supply Plan Section 163.3177, Florida Statutes requires local governments to adopt a 10-year WSP upon updates within 18 months of the governing board of the SFWMD approving a regional water supply plan. The most recent regional water supply plan was approved on November 8, 2018. The statute requires that local governments incorporate the alternative water supply project or projects selected by the local government from those identified in the regional water supply plan. However, while the City of Miami Beach owns its own water distribution and sanitary sewer system, it is entirely dependent on MDWASD for water supply and sewage treatment. As such, the City is limited in the water supply projects that it can implement on its own. The'City of Miami Beach's WSP must therefore be consistent with the Water Supply Facilities Work Plan for Miami-Dade County. The proposed amendment provides for consistency with both the South Florida Regional Water Supply Plan and the MDWASD 10-Year Water Supply Facilities Work Plan. The proposed ordinance adopts the new WSP by reference into the Comprehensive Plan. Additionally, it modifies the GOPs of the Comprehensive Plan to ensure that there is consistency between policies and. the WSP. One such amendment is to modify the potable water consumption standard from 246 to 156 average gallons per capita per day, which is consistent with data provided by MDWASD. The City previously adopted a WSP and implementing GOPs on October 27, 2010. The majority of the GOPs continue to be effective at reducing demands for potable water, providing for coordination between land use planning and water supply, and providing for intergovernmental coordination. As such, the necessary updates to the GOPs in the Infrastructure and Capital Improvements Elements are minimal. Page 571 of 1313 Property Rights Element Regarding the required property rights element, the proposed Ordinance incorporates the language provided within House Bill 59 into the 'Resilient Land Use and Development element of the 2040 Comprehensive Plan.A reference is provided to indicate that the GOPs required for the Property Rights element are incorporated into the 'Resilient Land Use and Development' element. The language incorporated is the following: OBJECTIVE RLU 1.6.PROPERTYRIGHTS The City will respect judicially acknowledged and constitutionally protected private property rights. POLICYRLU 1.6.1 The City will consider the following rights in local decision-making: 1. The rig,d of a property owner to physically possess and control his or her interests in the property, including easements, leases, or mineral rights. 2. The right of a property owner to use, maintain, develop, and improve his or her property for personal use or for the use of any otherperson, subject to state law and local ordinances. 3. The right of the property owner to privacy and to exclude others from the property to protect the owner's possessions and property. 4. The right of a property owner to dispose of his or her property through sale or gilt. COMPREHENSIVE PLANNING REVIEW PROCESS This referral is for a text amendment to the Comprehensive Plan. Under Section 163.3184(2), Florida Statutes, this amendment shall follow the expedited state review process for adoption of comprehensive plan amendments. This process requires a public hearing by the local planning agency (Planning Board), a public transmittal hearing before the City Commission, after which the amendment must be transmitted to several state agencies for a 30-day review period, and a final adoption public hearing before the City Commission. The amendment is effective 31-days after it is adopted if there are no appeals. PLANNING BOARD REVIEW On September 28, 2021, the Planning Board held a public hearing and transmitted the Ordinance to the City Commission with a favorable recommendation by a vote of 5-0. UPDATE The subject amendment was approved at First Reading on October 13, 2021,with no changes, and transmitted all applicable review agencies, as required by Section 163.3184, Florida Statutes. On November 24, 2021, the City received the following objection from the Department of Economic Opportunity(DEO),which serves as the State's Land Planning Agency: "Prior to adoption, the proposed amendment must be revised to include the statement of rights as its own, separate Property Rights Element to the Comprehensive Plan." Page 572 of 1313 In response to this objection, the Ordinance was revised to place the property rights amendment within its own element, instead of being integrated into the Resilient Land Use Element. This is a non-substantive change from what was presented at First Reading, and no other changes were made to the proposed ordinance. SUPPORTING SURVEY DATA Enhance and Improve Water Quality Citywide CONCLUSION The Administration recommends that the City Commission adopt the Ordinance. Applicable Area Citywide Is this a"Residents Right Does this item utilize G.O. to Know" item. pursuant to Bond Funds? City Code Section 2-14? Yes No Legislative Tracking Planning Sponsor Office of the City Manager ATTACHMENTS: Description 0 10 Year Water Supply Plan o Ordinance Page 573 of 1313 RISING ABOVE Ciety of Miami Beach 1 0- ear Water SupplyY Facilities Work Plan JANUARY 2022 FINAL Page 574 of 1313 ACl RISING ABOVE VERSION CONTROL DOCUMENTATION Version Date Author Description Draft 1 03/09/2021 Public Works Department Internal Review Draft 2 04/12/2021 Public Works Department Agency Curtesy Review Final Draft 3 05/07/2021 Public Works Department Agency Curtesy Review City of Miami Beach Public Works Department i 10-Year Water Supply Facilities Work Plan We are committed to providing excellent public service and safety to all who live, work and play in our vibrant, tropical, historic community. Page 575 of 1313 Introduction January 2022 RISING FINAL ABOVE TABLE OF CONTENTS Tableof Contents............................................................................................................ 1 Listof Tables.........................................................................................................................................2 Listof Appendices.................................................................................................................................3 Listof Acronyms....................................................................................................................................3 1. Introduction...............................................................................................................4 1.1 Statutory History.........................................................................................................................4 1.2 Statutory Requirements..............................................................................................................5 2. Background Information............................................................................................7 2.1 Overview.....................................................................................................................................7 2.2 Relevant Regional Issues...........................................................................................................7 3. Data and Analysis.....................................................................................................9 3.1 Current and Future Areas Served...............................................................................................9 3.2 City Infrastructure And Interconnects.........................................................................................9 3.3 Areas Served by Domestic Self Supply Systems.......................................................................9 3.4 Potable Water Level of Service Standard.................................................................................10 3.5 Population Projections..............................................................................................................10 3.6 Water Demand Projection.........................................................................................................11 3.7 Water supply by Miami-Dade County Water and Sewer Department......................................13 3.8 Conservation and Reuse Efforts...............................................................................................14 3.8.1 County-wide Efforts......................................................................................................14 3.8.2 City Specific Actions, Programs, Regulations, or Opportunities..................................15 3.8.3 MDWASD Specific Regulations...................................................................................17 4. Intergovernmental Coordination.............................................................................. 19 5. Capital Improvement...............................................................................................20 6. Goal, Objectives, and Policies................................................................................23 6.1 Future Land Use Element.........................................................................................................23 6.1.1 Objective RLU 1.2: Land Regulation ...........................................................................23 6.1.2 Goal RSE 1: Resilient Develeopment/Adaptation Action Area..................................23 6.2 Infrastructure Element......................................................:........................................................25 City of Miami Beach 1 10-Year Water Supply Facilities Work Plan We ore committed to providing excellent public service and safety to all who live work and play in our vibrant, tropical, historic community. Page 576 of 1313 F1 Introduction January 2022 RISING FINAL ABOVE 6.2.1 Objective INF 1.1: Priorities.........................................................................................25 6.2.2 Objective INF 1.8: Water Supply Planning..................................................................26 6.2.3 Objective INF 1.9.........................................................................................................28 6.2.4 Objective INF 1.9.1 ......................................................................................................28 6.2.5 Objective INF 1.9.2......................................................................................................29 6.2.6 Objective INF 1.9.3......................................................................................................29 6.2.7 Objective INF 1.9.4......................................................................................................29 6.2.8 Objective INF 1.9.5......................................................................................................29 6.2.9 Objective INF 1.9.6......................................................................................................29 6.2.10 Objective INF 1.9.7......................................................................................................29 6.3 Conservation Element...............................................................................................................30 6.3.1 Objective INF 1.6: Water Conservation.......................................................................30 6.4 Intergovernmental Coordination Element.................................................................................30 6.4.1 Objective ICE 1.1: Coordination Mechanisms.............................................................30 6.5 Capital Improvement Element..................................................................................................31 6.5.1 Objective CIP 1.3: Impact FEE Program.....................................................................31 6.5.2 Objective CIP 1.6: Infrastructure Expenditures ...........................................................31 7. References .............................................................................................................33 LIST OF TABLES Table 1: Historical Water Demand—Annual Average Daily Flow...............................................................10 Table 2: City Populations Projections.........................................................................................................11 Table 3: Population Projections..................................................................................................................11 Table 4: City Water Demand Projections....................................................................................................12 Table 5: MDWASD Current Water Projections...........................................................................................12 Table 6: MDWASD vs.City Water Demand Flow Projections....................................................................13 Table 7: MDWASD Adopted FY 2020-2026 Capital Budget and Multi-Year Capital Plan .........................20 Table 8: City of Miami Beach Capital Improvement Projects(2021 —2025)..............................................21 Table 9: Proposed 5-Year Critical Needs Capital Plan(W&WW)...............................................................22 Table 10: Water Projects Totals Per Year(2020—2025)...........................................................................22 City of Miami Beach 2 10-Year Water Supply Facilities Work Plan We are committed to providing excellent public service and safety to all who live work and play in our vibrant, tropical,historic community Page 577 of 1313 Introduction January2022 RISING FINAL ABOVE LIST OF APPENDICES Appendix A-Figures Appendix B-2020-2026 MDWASD Adopted Budget and Multi-Year Capital Plan Appendix C-City of Miami Beach Adopted FY 2021-2025 Capital Improvement Plan Appendix D—Resolution 2020-31211 Passed and Adopted on March 18, 2020 LIST OF ACRONYMS Abbreviation Definition AWWA American Water Works Association City City of Miami Beach DEO Department of Economic Opportunity DERM Miami-Dade County Department of Environmental Resources Management EPA U.S. Environmental Protection Agency FY Fiscal Year GPCED Gallons Per Capita Per Day gpm gallon(s)per minute ICE Intergovernmental Coordination Element INF Infrastructure LDR Land Development Regulations LEC Lower East Coast MDWASD Miami-Dade Water and Sewer Department MGD Million Gallons Per Day No. Number Qty Quantity RER Regulatory and Economic Resources ROW Right-of-Way rpm Revolutions Per Minute RSE Resiliency and Sustainability Element RWSP Regional Water Supply Plan SCADA Supervisory Control and Data Acquisition SEOC State Emergency Operations Center SFWMD South Florida Water Management District WTP Water Treatment Plant City of Miami Beach 3 10-Year Water Supply Facilities Work Plan We are committed to providing excellent public service and safety to all who live work and ploy in our vibrant, tropical, historic community Page 578 of 1313 Introduction January 2022 RISING FINAL ABOVE 1 . INTRODUCTION The City of Miami Beach (City)is presenting a 10-year Water Supply Facilities Work Plan that will guide the City's efforts to thrive and preserve sustainable sources of water for its overall Water Service Area in coordination with the 2018 Lower East Coast Water Supply Plan Update (LEC). The City is a Miami-Dade County Water and Sewer Department (MDWASD) wholesale water customer. The City owns and operates the water distribution within the City's service areas. In accordance with state and local codes, Miami-Dade County issues the City's Annual Operating Permit. The City of Miami Beach 2010 10-Year Water Supply Facilities Work Plan was prepared and adopted in 2010 according to the South Florida Water Management District(SFWMD).An update to the 2007 Lower East Coast Regional Water Supply Plan was approved in 2013. The latest update to the LEC Plan was approved in 2018. The Water Supply Plan is required to be based on a 10-year planning horizon and to be updated every five years or within 18 months of a revision to the LEC Plan. On November 8, 2018 the SFWMD Governing Board approved the Lower East Coast Water Supply Plan Update to ensure there will be enough drinking water for more than 6 million residents in South Florida's Lower East Coast Region. Therefore, local governments are required to revise their Comprehensive Plan to include their updated Water Supply Facilities Work Plan within 18 months after the date the Regional Water Supply Plan Update was adopted. The City of Miami Beach 202010-Year Water Supply Work Plan is not only intended to meet legislative requirements but also to identify and address the needs of water supply facilities to serve existing and new development within our local jurisdiction. The City of Miami Beach 10-Year Water Supply Facilities Work Plan is divided into six sections: Section 1 —Introduction Section 2— Background Information Section 3—Data and Analysis Section 4—Intergovernmental Coordination Section 5—Capital Improvement Elements Section 6—Goals, Objectives and Policies 1 .1 STATUTORY HISTORY The State of Florida Legislature enacted bills in the beginning of 2002 and continuing in 2004, 2005, 2011, 2012, 2015 and 2016 that required all the local governments to prepare a 10-Year Water Supply Work Plan. Florida Statutes Section 373.709 and Section 163.3177(6)(c)3 require the water supply work plan be updated within 18 months after a water management district's governing board approves an updated regional water supply plan. The Regional Water Supply Plan prepared by the water management districts, along with the subsequent Comprehensive Plan prepared by the local governments, is intended to improve coordination between local land use planning efforts and regional water planning. City of Miami Beach 4 10-Year Water Supply Facilities Work Plan We are committed to providing excellent public service and safely to all who live work and play in our vibrant, tropical,historic community Page 579 of 1313 Introduction January 2022 RISING FINAL ABOVE 1 .2 STATUTORY REQUIREMENTS The City of Miami Beach has evaluated the following statutory provisions to update this 10-year Water Supply Facilities Work Plan: 1. Coordinate appropriate aspects of the Comprehensive Plan with the applicable RWSP (2018 Lower East Coast Water Supply Plan Update) [Section 163.3177(4)(a), F.S.]. 2. Ensure the Future Land Use Plan is based on availability of adequate water supplies and public facilities and services [Section 163.3177(6)(a), F.S.]. Data and analyses demonstrating that adequate water supplies and associated public facilities will be available to meet projected growth demands must accompany all proposed Future Land Use Plan and Plan amendments submitted for review. 3. In consultation with the water supplier, ensure adequate water supplies and potable water facilities are available to serve new development no later than the issuance by the local government of a certificate of occupancy or its functional equivalent[Section 163.3180(2), F.S.]. 4. For local governments subject to an RWSP, revise the General Sanitary Sewer, Solid Waste, Drainage, Potable Water, and Natural Groundwater Aquifer Recharge element (the "Infrastructure element")through a Comprehensive Plan amendment to: A. Identify and incorporate the alternative water supply project(s)selected by the local government from projects identified in the applicable RWSP, or alternative project(s) proposed by the local government under Section 373.709(8)(b), F.S. [Section 163.3177(6)(c), F.S.]. B. Identify the traditional and alternative water supply projects and the conservation and reuse programs necessary to meet water needs identified in the applicable RWSP [Section 163.3177(6)(c)3., F.S.]; and C. Update the Work Plan for at least a 10-year planning period for constructing the public, private, and regional water supply facilities identified in the element as necessary to serve existing and new development[Sections 163.3177(6)(c)3. and (5), F.S.I. 5. Revise the Five-Year Schedule of Capital Improvements to include water supply, reuse, and conservation projects and programs to be implemented during the 5-year period [Section 163.3177(3)(a)4., F.S.]. 6. To the extent necessary to maintain internal consistency after making changes described in Paragraph 1 through 5 above, revise the Conservation element to assess projected water needs and sources for at least a 10-year planning period,considering the applicable RWSP and water use permit(s) [Section 163.3177(6)(d), F.S.]. The comprehensive plan must address the water supply sources necessary to meet the existing and projected City of Miami Beach 5 10-Year Water Supply Facilities Work Plan We ore committed to providing excellent public service and safety to all who live work and play in our vibrant, tropical,historic community Page 580 of 1313 '1=ri<-{ i I Introduction January 2022 RISING FINAL ABOVE water use demand for the established planning period, considering the applicable RWSP [Section 163.3167(9), F.S.]. 7. To the extent necessary to maintain internal consistency after making changes described in Paragraphs 1 through 5 above, revise the Intergovernmental Coordination element to ensure consistency between the Comprehensive Plan and the applicable RWSP [Section 163.3177(6)(h)1., F.S.]. 8. Local governments are required to comprehensively evaluate and update the Comprehensive Plan to reflect changes in local conditions every seven years. The evaluation could address the local government's need to update their Work Plan, including the development of alternative water supplies, and determine whether the identified alternative water supply projects, traditional water supply projects, and conservation and reuse programs are meeting local water use demands [Section 163.3191(3), F.S.]. 9. Local governments may be exempt from updating their Work Plan if they meet certain criteria. A local government that does not own, operate, or maintain its own water supply facilities and is served by a public water supply entity with a permitted allocation of 300 million gallons per day or greater is not required to amend its Comprehensive Plan when an RWSP is updated if the local government uses less than 1 percent of the public water supply entity's total permitted allocation. However, the local government must cooperate with the public water supply entity that provides service within its jurisdiction and must keep the Sanitary Sewer, Solid Waste, Drainage, Potable Water, and Natural Groundwater Aquifer Recharge element up to date, pursuant to Section 163.3191, F.S. A local government should contact the Florida Department of Economic Opportunity(DEO) to verify its qualifications for the exemption [Section 163.3177(6)(c)4., F.S.]. 10. Local governments with a Sector Plan adopted in accordance with Section 163.3245, F.S., should incorporate information from the adopted Sector Plan, Master Plan, and Detailed Specific Area Plan into the Work Plan. The focus should be on water needs, water supply and resource development, conservation measures, and intergovernmental coordination activities with the SFWMD and water supply development projects needed to address projected development in the Sector Plan area [Section 163.3245, F.S.] City of Miami Beach 6 10-Year Water Supply Facilities Work Plan We are committed to providing excellent public service and safety to all who live work and play in our vibrant, tropical, historic community Page 581 of 1313 B_ACH I Background Information January 2022 RISING FINAL ABOVE 2. BACKGROUND INFORMATION 2.1 OVERVIEW The City of Miami Beach is located in eastern Miami-Dade County. It was incorporated on March 26, 1915. The boundaries of the City encompass an area of approximately 7.5 square miles between the Atlantic Ocean and Biscayne Bay that separates the Beach from the mainland city of Miami.The South Beach neighborhood of Miami Beach attracts many visitors around the world for its historic Art Deco architecture, restaurants, clubs and beaches. Miami Beach had an estimated residential population of approximately 97,000 in 2020, according to the Water System Master Plan (Hazen 2019). The City also accommodates a transient population comprised of hotel guests and commuting employees, estimated at approximately 62,000 in 2020 (Hazen 2019). Consequently, the City's water distribution system is estimated to serve a total equivalent population of approximately 159,000 in 2020. Section 3.5 of this document describes in detail how this equivalent population is calculated. The City of Miami Beach is governed by a commission-managerial system. It is governed by an elected mayor and six-member City Commission. The Mayor is elected every two years. The commissioners are elected to serve four years with a term limit of two terms. The commission appoints the City Manager, who oversees the City Administration, and the City Attorney who oversees the Office of the City Attorney. As the City is facing an increase in flooding due to sea level rise, the Miami Beach Land Use Board incorporates criteria to address and plan for the effects of sea level rise and climate change. The City of Miami Beach encourages the economic and environmental health of the community through sustainable and environmentally friendly design and construction which reduces demand on natural resources while improving the overall quality of life. The City of Miami Beach is committed to resilient and strategic planning to mitigate impacts of climate change. One of the strategies includes evaluation and assessment of vulnerable areas of the City to develop guidelines and recommendations to mitigate potential impacts of sea level rise in our neighborhoods. Resilient land use strives to transform the way buildings and communities are designed, built, and operated, in order to create buildings and communities that are environmentally and socially responsible, healthy, and prosperous. Land use developments can affect some or all types of properties. 2.2 RELEVANT REGIONAL ISSUES As the state agency responsible for water supply in the Lower East Coast planning area, the SFWMD plays a pivotal role in resource protection, and does so by balancing and improving water quality, flood control, natural systems and water supply. The SFWMD has several ongoing key initiatives in an effort to execute this goal of resource protection, such as the cleanup and restoration of the Everglades, and enforcing limitations on increased allocations dependent on the region's surficial groundwater system, the Biscayne Aquifer. As part of the SFWMD's water City of Miami Beach 7 10-Year Water Supply Facilities Work Plan We are committed to providing excellent public service and safety to all who live work and play in our vibrant, tropical, historic community. Page 582 of 1313 '.' B-`ACH Background Information January 2022 RISING FINAL ABOVE use permit program, the Regional Water Availability Rule was adopted by the Governing Board on February 15, 2007. This Rule promoted reduced reliance on the regional system for future water supply needs, by mandating the development of alternative water supplies, and increasing conservation and reuse. Although the City is fully dependent on the MDWASD for their potable water source as well as its wastewater treatment & disposal and therefore has limited ability to feasibly implement alternative water supplies and reuse, the City is aligned with these SFWMD initiatives through its implementation of the water conservation program, further described in Section 3.8. As described in this Work Plan, the City is committed to minimizing, to the extent possible, the impacts of its current and future water supply needs. City of Miami Beach 8 10-Year Water Supply Facilities Work Plan We are committed to providing excellent public service and safely to all who live work and play in our vibrant, tropical, historic community Page 583 of 13'(3 '1=f i :H I Data and Analysis January 2022 RISING FINAL ABOVE 3. DATA AND ANALYSIS This section of the Work Plan describes the information that local governments need to provide to state planning and regulatory agencies as part of their proposed comprehensive plan amendments. 3.1 CURRENT AND FUTURE AREAS SERVED The current area served by Miami Beach is presented in Figure 1, located in Appendix A of this report. As of now, the City of Miami Beach has no intention to extend its service area. The current public water supply utility service areas in Miami-Dade County are presented in Figure 2, also located in Appendix A of this report. 3.2 CITY INFRASTRUCTURE AND INTERCONNECTS The City of Miami Beach water distribution system is supplied and metered by MDWASD through the four water main connections listed below—as illustrated in Figure 3: Water Supply Interconnects with MDWASD, in Appendix A. • 20-inch diameter water main on Watson Island (MacArthur Causeway) • 30-inch diameter water main on San Marco Island (Venetian Causeway) • 36-inch diameter water main on Julia Tuttle Causeway (Norwood) • 36-inch diameter water main on Normandy Isle (79th Street Causeway) The City of Miami Beach owns and operates booster pump stations that boost the water pressure within the City and pump potable water from above ground storage tanks to the rest of the City. MDWASD is in the process of making modifications to a fifth interconnect located at the north border of the City (next to the border with the Town of Surfside), to be able to supply water to the City in case of emergency. This emergency interconnect is a 24-inch diameter water main. The water flow through this interconnect will be measured by MDWASD via a new meter that is being installed at Byron Avenue. 3.3 AREAS SERVED BY DOMESTIC SELF SUPPLY SYSTEMS The City of Miami Beach does not have any potable water wells because the groundwater has very high chloride concentration, and therefore it's not apt for public consumption nor for irrigation. City of Miami Beach 9 10-Year Water Supply Facilities Work Plan We are committed to providing excellent public service and safety to all who live work and play in our vibrant, tropical, historic community. Page 584 of 13b 2" P` I Data and Analysis January 2022 RISING FINAL ABOVE 3.4 POTABLE WATER LEVEL OF SERVICE STANDARD Based on the City's Water System Master Plan (Hazen 2019),the average of the equivalent water demand per capita is 156(gpced).This average was calculated based on historical water demand from the year 2015 to 2018 (Table 1), considering the estimated total residential and transient population. Section 3.5 of this document describes in detail how this equivalent population served is calculated. Table 1: Historical Water Demand-Annual Average Daily Flow Per Capita MDWASD Equivalent Population Billed Water Water Demand Equivalents Served (mod) ced 2015 145,627 23.2 159 2016 148,031 23.2 157 2017 150,480 23.6 157 2018 153,674 23.0 150 Average - 23.2 156 Source: CMB 2019 Water Master Plan Per the Comprehensive Plan, the following City-wide Level of Service Standards are typically used as the basis for determining the availability of facility capacity for non-residential uses; the systems shall be able to provide/accommodate at least the minimums specified: Hotel: 75 gallons per day per room Office: 0.084 gallons per day per square foot Retail: 0.18 gallons per day per square foot Industrial: 0.084 gallons per day per square foot Restaurant: 65 gallons per day per seat School: 12 gallons per day per student 3.5 POPULATION PROJECTIONS The City of Miami Beach current and future population were projected as part of the 2019 Water Master Plan. The total equivalent population served by the City's water system is comprised of three categories: residents, employees and hotel guests. The employee population category corresponds to the floating population that commutes to the City but are not actual residents. Residents are non-transient population, while employees and hotel guests makeup the transient population. Table 1 presents the population projections through the year 2045. To estimate the water demand for the City, the number of"Population Equivalents Served" was calculated by combining the numbers forecasted for residents, employees, and hotel guests. In this calculation, it was assumed that a hotel guest has a similar water usage as a resident; therefore, one hotel guest is equivalent to one resident. However, the water consumption City of Miami Beach 10, 10-Year Water Supply Facilities Work Plan We are committed to providing excellent public service and safely to all who live work and play in our vibrant, tropical, historic community Page 585 of 1313 BEACH I Data and Analysis January 2022 RISING FINAL ABOVE corresponding to an employee was assumed to be half of that of a resident. Therefore, the total number of"Population Equivalents Served" is equal to the number of residents plus the number of hotel guests plus half of the number of employees. Table 2: City Populations Projections 2020 2025 2030 2035 2040 2045 Residents 97,192 101,905 106,618 111,332 116,045 120,758 Employees 71,161 76,256 81,352 86,447 91,542 96,637 Hotel Guests 26,113 31,727 34,180 36,822 39,667 42,732 Total Population 196,486 211,913 224,180 236,636 249,294 262,172 Population 158,885 171,760 181,474 191,377 201,483 211,809 Equivalents Source: CMB 2019 Water Master Plan Table 3 below lists the City's population projection based on 2015 TAZ Population Projections Update included in the County's 2020 draft Water Supply Facilities Work Plan anticipated to be adopted in 2021. The County's populations projections in the 2020 draft Water Supply Plan do not include transient populations. Table 3: Population Projections 2015 2016 1 2020 2025 20-30 2035 1 2040 Total 92,472 93,490 1 97,563 102,654 107,745 112,836 1 117,927 Source:2015 TAZ Population Projections Update, County draft 2020 WSP The 2019 Water Master Plan population projections and the 2015 TAZ population projections reported by MDWASD are different because the 2019 Water Master Plan projections used 2017 TAZ Update and also considered the transient population. When comparing the residential population only, the 2019 Master Plan and the MDWASD projections were relatively similar, with estimated population of 97,192 and 97,563 for 2020, and 116,045 and 117,927 for 2040, respectively. Therefore, for 2040, the projected MDWASD population was only about 1.6% greater than the 2019 Water Master Plan projection. 3.6 WATER DEMAND PROJECTION Water demand projections were developed using the projected population equivalents data presented in Table 4 and the average historical per capita equivalent water consumption of 156 gpced, presented in Table 1. For water demand forecasting, the year 2018 was used as the base City of Miami Beach 11 10-Year Water Supply Facilities Work Plan We are committed to providing excellent public service and safety to all who live work and play in our vibrant, tropical,historic community Page 586 of 1313 Data and Analysis� Y � January 2022 RISING FINAL ABOVE year for determining changes in population for each time step. The baseline demand for 2018 was developed by using the actual water consumption metered by the City per sewer basin in 2018 and applying a correction factor across each basin to account for(a)non-metered flows and distribution system losses and (b) corresponding water consumption assuming the historical average per capita equivalent consumption of 156 gpced. The water demand for each projection year was then estimated using a per capita equivalent water consumption of 156 gpced for the corresponding population equivalent for each year. Table 4: City Water Demand Projections 2020 2025 2030 2035 2040 2045 Projected Population — Totalresidc.ntial+ 196,486 211,913 224,180 236,636 249,294 262,172 transient Populations 158,885 171,760 181,474 191,377 201,483 211,809 Equivalents Served Water Demand (MGD)-Total(Annual Average 24.7 26.7 28.2 29.8 31.4 33.0 Demand) Source: CMB 2019 Water Master Plan The data presented below in Table 5 was obtained from the 2015 TAZ Population Projections Update, included in Appendix C of the County's 2020 Draft Water Supply Facilities Work Plan, and is anticipated to be adopted in 2021. The City's water use per capita was determined based on the residential population only, thus resulting in a significantly greater value of 241.6 gpcd. Table 5: MDWASD Current Water Projections ACTUAL PROJECTED 2015 2020 2025 2030 2035 2040 Miami Beach Population 92,472 97,563 102,654 107,745 112,836 117,927 Miami Beach Gallons per Capita per 241.6 241.6 241.6 241.6 241.6 241.6 Da GPCD Miami Beach Water Demand Projections, 22.34 23.57 24.80 26.03 27.26 28.49 Million Gallons per Day MGD Source:2015 TAZ Population Projections Update,Appendix C of County draft 2020 WSP Table 6 below shows the difference between water demand projections from MDWASD 2015 TAZ population projections update and City's latest water demand projections from the 2019 Water Master Plan.The latest City demand projections are generally greater than MDWASD's, with 24.7 mgd and 23.6 mgd in 2020, and 31.4 mgd and 28.5 mgd in 2040, respectively. The difference in water demands projections can be explained by the City's analysis considering the transient City of Miami Beach 12 10-Year Water Supply Facilities Work Plan We are committed to providing excellent public service and safety to all who live work and play in our vibrant, tropical, hisforic community Page 587 of 13b H Data and Analysis January 2022 RISING FINAL ABOVE population to be a greater contributor to demands, having a greater rate of demand increase than that due to the residential population over the planning period. As stated in the previous section, the County did not consider transient populations in their population projections and water demand projections. Alternatively, the County's projections used a systemwide residential per capita approach, yielding an approximate 5% lower total estimated water demand for 2020 and 10% lower total estimated water demand for 2040. The City's latest projections will be supplied to MDWASD so that the water supply planning for this service area is coordinated accordingly. Table 6: MDWASD vs. City Water Demand Flow Projections 2020 2025 2030 2035 2040 MDWASD Water Demand Projections 23.6 24.8 26.0 27.3 28.5 City Water Demand Projections 24.7 26.7 28.2 29.8 31.4 WASD vs 2019 Master Plan Projections 1.1 1.9 2.2 2.5 2.9 MGD Source: CMB 2019 Water Master Plan, Appendix C of County draft 2020 WSP 3.7 WATER SUPPLY BY MIAMI-DADE COUNTY WATER AND SEWER DEPARTMENT The County is currently working on updating its 2020 draft Water Supply Plan. Additionally, Miami-Dade County is also currently updating its Water Use Permit 13-00017-W to include 2040 planning horizon. The City has shared its 2020 Water Supply Plan draft with the County that details the City's water demand projections per the City's 2019 Master Plan. The requirement for a 20-year Water Supply Agreement is imposed by the South Florida Water Management District (SFWMD) as a condition of the water permit granted to Miami-Dade County to act as a water supplier. The City and the Miami-Dade County entered into a 20-year wholesale water service agreement in July of 2008. No new water sources or suppliers are anticipated to be needed at the City within the planning period associated with this Water Supply Plan. At the time that the City and the County renew the 20-year water agreement in 2028, further coordination will take place to make sure that MDWASD continues to meet the City's projected water demands, per the City's 2019 Master Plan or latest available planning study. The referenced information is the best available data, as required by Section 163.3177(1)(0, F.S. The Draft 2020 Miami-Dade County Work Plan Update includes data and analysis that demonstrates that there is sufficient water available to serve the projected water needs of the City and the County through the year 2035. The information has been incorporated by reference into the City's Work Plan. City of Miami Beach 13 10-Year Water Supply Facilities Work Plan We are committed to providing excellent public service and safety to all who live work and play in our•vibrant, tropical, historic community Page 588 of 1313 EAR- I Data and Analysis January 2022 RISING FINAL ABOVE 3.8 CONSERVATION AND REUSE EFFORTS The City of Miami Beach coordinates the planning of potable water and sanitary sewer facilities, services and level-of-service standards with the MDWASD, DERM and the SFWMD. The City of Miami Beach is updating its Work Plan considering the SFWMD updates to the Lower East Coast Water Supply Plan. Consequently,water conservation is a key component to the City's Work Plan. The City of Miami Beach is very involved in multiple initiatives to promote conservation, in coordination with SFWMD and MDWASD's efforts. The City, through the Building Department, will continue to enforce the requirement to use high efficiency fixture water saving devices for substantial rehabilitation and new construction projects, as specified in the standard plumbing code. All future development within the City will be required to comply with water use efficiency standards for indoor water use in accordance with Section 8- 31, 32-83.1, 32-84 and 8A-381 of the Code of Miami-Dade County. In addition, all future development will be required to comply with the landscape standards in Section 18-A and 18-B of the current Miami-Dade County Code and future updates. The City of Miami Beach educates the development community on the benefits of sub-metering for multi-family residential retrofit projects,which are encouraged to include separate water meters and monthly records kept of all major water-using functions—such as cooling towers and individual units. The City will start a pilot incentive program as a means of encouraging developers that retrofit units to install separate meters and high efficiency appliances. The City will require new multi-family residential developments to install separate water meters for each unit. Additionally, the City is currently working on a CIP funded City-Wide water meter replacement project, planned to be completed in 2022. The new water meter technology will enable the City to have more accurate readings of water being consumed. The new water meters will also provide a customer portal in which the customer will be able to track daily consumption, spikes in usage and possible leaks. This new tool will help customers (and City) track consumption and help conserve potable water. The City signed an interlocal agreement with Miami-Dade County on December 2014 for the provision of wholesale sewage disposal by MDWASD for a period of 20 years. All sewage flows produced by the City are sent to WASD's Central District Wastewater Treatment Plant.Therefore, the City does not have the means to feasibly produce reclaimed water nor to implement a reuse program/policies. MDWASD is responsible for accepting and treating sewer flows as well as having a reuse program. 3.8.1 COUNTY-WIDE EFFORTS The City of Miami Beach is collaborating with the SFWMD and Miami-Dade County in meeting their common water conservation goals. Miami-Dade County's Water Conservation Program looks to promote a water-saving ethic among residents, visitors, and businesses. The City of Miami Beach educates its constituents about City of Miami Beach 14 10-Year Water Supply Facilities Work Plan We are committed to providing excellent public service and safety to all who live work and play in our vibrant, tropical, historic community Page 589 of 13b ` ---i.I Data and Analysis January 2022 RISING FINAL ABOVE incentives offered by Miami-Dade County that help reduce water use. The City of Miami Beach cooperates with MDWASD to continue to implement the City's comprehensive water conservation program to ensure that a sufficient, economical supply of fresh water is available to meet current and future demand for potable water. MDWASD, in conjunction with the Planning Department and other applicable County departments and agencies, published a Water Use Efficiency Standards Manual, effective January 2009,to achieve maximum water savings in new residential and commercial developments in the incorporated and unincorporated areas of Miami-Dade County. The Miami-Dade County 20-Year Work Plan (2014-2033) Section 4.5 (Water Conservation and Reuse), MDWASD is implementing a 20-year water conservation plan. Through the end of fiscal year 2019, a cumulative total of 15.80 MGD of water has been saved since implementation of the water conservation program. A systemwide total of 0.26 MGD/year is planned through 2040 for an additional cumulative total of 5.46 MGD. Additionally, as part of the County's water conservation efforts, the City is mandated per County Code and its Potable Water Supply Annual Operating permit to maintain water distribution system loss to less than 10% or submit corrective action plan that includes a leak detection program. The City reports to DERM annually a Water Accounting Data Form that details City's accounted and unaccounted water usage. 3.8.2 CITY SPECIFIC ACTIONS, PROGRAMS, REGULATIONS, OR OPPORTUNITIES The City, through the Building Department, will continue to enforce the requirement to use high efficiency fixture water saving devices for substantial rehabilitation and new construction projects as specified in the standard plumbing code.All future development within the City will be required to comply with water use efficiency techniques for indoor water use in accordance with Section 8-31, 32-83.1, 32-84 and 8A-381 of the Code of Miami-Dade County. In addition, all future development will be required to comply with the landscape standards in Section 18-A and 18-B of the Miami-Dade County Code. Furthermore, the City is currently performing a review of City landscape ordinance Chapter 126 to better align with District's Year-Round Irrigation Rule, Chapter 40E-24, FAC. Ordinance review and update efforts are being done in conjunction with Miami-Dade County's (MDWASD) review. The County's updated landscape ordinance is currently under internal review and is tentatively scheduled to be submitted to Board of County Commissioners for first reading by June 2021 and adopted by August/September 2021. If the County's ordinance update includes all the incorporated and unincorporated cities,the City will follow County's updated landscape ordinance and will not need to update City ordinance. In the case it does not include all the incorporated cities, then the City will draft and adopt an updated ordinance similar to that of the County's, tentatively by early 2022. City of Miami Beach 15 10-Year Water Supply Facilities Work Plan We are committed to providing excellent public service and safety to all who live work and play in our vibrant, tropical, historic community Page 590 of 1313 - %� F i Data and Analysis January 2022 RISING FINAL ABOVE The City of Miami Beach continues to administer Land Development Regulations (LDR) consistent with Section 163.3202, F.S. that also contain specific and detailed provisions required to implement the adopted Comprehensive Plan and which as a minimum: 1. Regulate the subdivision of land; 2. Regulate the use of land and water consistent with this Element and ensure the compatibility of adjacent land uses and provide for open space; . 3. Protect the Conservation (beach) lands designated on the Future Land Use Map and in the Conservation Element; 4. Regulate areas subject to seasonal and periodic flooding and provide for drainage and stormwater management; 5. Regulate design of architecturally significant and oceanfront buildings; 6. Regulate signage; 7. Ensure safe and convenient traffic flow and vehicle parking needs; and 8. Provide that development orders and permits shall not be issued which result in a reduction of the level of services for the affected public facilities below the level of service standards adopted in this Comprehensive Plan. In efforts to conserve water and reduce potable water loss through the distribution system the City began implementing a comprehensive Leak Detection Program in early 2019. The City's ongoing leak detection program consists of the following tasks and scope of work below. Task 1- Unmetered Water/Hydrant Meter Procedures Review: review of current procedures for how these usages are accounted, tracked and billed in order to better estimate water losses and allow for better tracking of these usages. (Ongoing) Task 2- Large Meter Field Inspection:field investigation and reporting of all 3-inch and larger City meters (approximately 354 meters). (Completed) Task 3-City-Wide Leak Detection Survey and Pinpointing: perform a comprehensive leak survey of approximately 180 miles of water main using sonic leak detection sound amplification instruments in conjunction with other technology to pinpoint leaks. (Completed) Task 4- Water Audit — review and evaluation of non-revenue water, difference between the amount of water billed to customers and the amount of water pumped into the distribution system using a software developed by the American Water Works Association (AWWA). (Completed) Task 5- Meter Standard Detail: review and update of the City's water meter related standards details for completeness, accordance with industry standards and relevance to City current and future needs. (Completed) Task 6- Leak Detection Technology Review: review of leak detection monitoring technology options for implementation in a formal leak detection program. (Completed) City of Miami Beach 16 10-Year Water Supply Facilities Work Plan We are committed to providing excellent public service and safety to all who live work and play in our vibrant, tropical, historic community Page 591 of 1313 BEA t,_t I Data and Analysis January 2022 RISING FINAL ABOVE Ongoing leak detection efforts are reported to DERM and are a result of having greater than 10% unaccounted for water loss throughout the City service area.The City of Miami Beach will continue to monitor and update its water distribution system to decrease water loss and conserve our precious water resources. 3.8.3 MDWASD SPECIFIC REGULATIONS The City of Miami Beach implements water conservation efforts by following Miami-Dade County ordinances per Infrastructure Element,Objective INF 1.6: Water Conservation, Policy 1.6.6 of City of Miami Beach 2040 Comprehensive Plan. Miami-Dade County ordinances are as follow: Sect. 8-31 - Plumbing fixtures The maximum water consumption flow rates and quantities for all plumbing fixtures, fixture fittings and appliances shall be in accordance with Table 604.4. Effective January 1, 2009, permit applications for new residential and commercial structures shall include high efficiency plumbing fixtures, fixture fittings and appliances as provided in Table 604.4. Such high efficiency plumbing fixtures, fixture fittings and appliances shall comply with the specifications in Table 604.4 or have received the U.S. Environmental Protection Agency (EPA)WaterSense Label. Exceptions: 1. Blowout design water closets [3.5 gallons (13L) per flushing cycle] 2. Vegetable sprays. 3. Clinical sinks [4.5 gallons (17 L) per flushing cycle]. 4. Service sinks. 5. Emergency showers. Sec. 8A-381. -Intent and application. (a) It is the intent of this article to permit remetering and encourage the conservation of water resources. (b)The provisions of this article shall be construed liberally to promote the following: To establish a comprehensive regulatory system to assure that the practice of remetering of water services and billing are just and reasonable;to assure that billing for water service at multiple unit properties is based on individual unit usage; to assure that Residents are charged fairly for the services provided by those engaged in remetering; to assure that Owners and Residents are protected from unscrupulous business practices; and to establish the rights and responsibilities of the Owner, Resident and the Remeterer. (c) The provisions of this article shall apply to multiple unit properties utilizing water services. Effective January 1, 2009, all permit applications for new multifamily residential developments shall be required to include a submeter for each individual dwelling unit. City of Miami Beach 17 10-Year Water Supply Facilities Work Plan We are committed to providing excellent public service and safety to all who live work and play in our vibrant, tropical, historic community Page 592 of 1313 L,b,C H i Data and Analysis January 2022 RISING FINAL ABOVE (d)Any Owner or Remeterer who has installed submeters and who has been individually billing Residents for water service prior to the adoption of this article shall have ninety (90) days from the date of enactment to comply with the provisions of this article. (e) Any municipality that operates its own water utility in Miami-Dade County may petition, in writing, that the CSD enforce remetering for their retail customers provided that the municipality adopts an ordinance or resolution authorizing Miami-Dade County to regulate water remetering in its municipality. In such cases, all references to MDWASD shall apply to that municipality's water service. For more information on water remetering refer to County website on Water Remetering(https://www.miamidade.gov/global/economy/consumer-protection/water- remetering.page). Sect. 32-84 Water Use Efficiency Manual The Miami-Dade Water and Sewer Department ("MDWASD"), in consultation with the Planning Department and such other applicable county departments and agencies published a Water Use Efficiency Standards Manual, effective January 2009, to achieve maximum water savings in new residential and commercial developments in the incorporated and unincorporated areas of Miami- Dade County. The manual shall be initially published on January 1, 2009 and may be updated annually on January 1 following approval by the County Commission. Each applicant for water service to a new residential or commercial development in incorporated and unincorporated areas of Miami-Dade County shall include in its application every water use efficiency standard that will be incorporated into the new development. The County or applicable municipality shall review the application for compliance with the manual. In evaluating the application for compliance, the County or applicable municipality will consider the availability of products required to implement the water use efficiency standards. The developer's agreement for water service shall include the water use efficiency standards approved by the County. Sec. 32-86. -Water use efficiency and conservation education and outreach. The Miami-Dade County Water Use Efficiency Manager shall provide public information, education and outreach on all water use efficiency standards and water conservation programs. City of Miami Beach 18 10-Year Water Supply Facilities Work Plan We are committed to providing excellent public service and safety to all who live work and play in our vibrant, tropical, historic community Page 593 of 1313 V. :� �,C.H I Intergovernmental Coordination January 2022 RISING FINAL ABOVE A. INTERGOVERNMENTAL COORDINATION Miami Beach supports intergovernmental coordination efforts, strategic partnerships and enforce concurrency management requirements to maintain required levels of service for essential public facilities, and to mitigate potential adverse impacts of new development and redevelopment. Requests for development orders or permits are coordinated, as appropriate, with MDWASD, DERM and SFWMD. Ongoing coordination efforts will continue to occur between the County and the City through the water allocation permitting process. Monthly building permit data will continue to be provided to DERM to track development activity within the City. The City will continue to monitor proposed amendments to the Miami-Dade County Comprehensive Development Master Plan as they relate to water supply planning in the adjacent beach communities and provide input as necessary. The City and the County will continue to coordinate any new or updates to ordinances per the new regulatory requirements as we have done in the past. For example, update to City Landscape Ordinance is being closely coordinated with the County for concurrence. It is imperative that the City and the County are always in coordination and share latest information, documents and reports that pertain to both entities. MDWASD as the City's water provider and the agency that holds the water use permit that provides water to Miami Beach,-needs to have latest City's water master plan. The City's 2019 Master Plan was provided to the County to better coordinate planning efforts. The City will look into implementing policies and procedures to ensure that as a City we continue to share Master Plan updates and planning efforts in the future with the County. The City has also shared its 2020 Draft Water Supply Plan with the County, which details the City's latest water demand projections. As stated above, the City will continue to share any updated planning documents going forward. The City and the Miami-Dade County hold a 20-year wholesale water service agreement, signed in July of 2008. At the time that the City and the County renew the 20-year water agreement in 2028, further coordination will take place to make sure that MDWASD continues to meet the City's projected water demands. City of Miami Beach 19 10-Year Water Supply Facilities Work Plan We are committed to providing excellent public service and safety to all who live work and play in our vibrant, tropical, historic community. Page 594 of 1313 'P A i'` ', Pl_A� H � Capital Improvement January 2022 RISING FINAL ABOVE 5. CAPITAL IMPROVEMENT As a wholesale customer of MDWASD, the City of Miami Beach is not responsible for providing infrastructure for the treatment of potable water within its boundaries. MDWASD provides funding for various projects related to the treatment of potable water that is subsequently distributed by the City. The City owns and operates the distribution infrastructure as well as pumping and storage facilities within its service area. MDWASD provides water to the City of Miami Beach via the Hialeah/Preston Water Treatment Plant (WTP). Table 7 is an excerpt from the MDWASD Adopted Budget and Multi-Year Capital Plan indicating the planned improvements to the Hialeah/Preston WTP from 2019 until 2023. See Appendix B for the 202020-2026 MDWASD Adopted Budget and Multi-Year Capital Plan. Table 7: MDWASD Adopted FY 2020-2026 Capital Budget and Multi-Year Capital Plan WATER TREATMENT PLANT-HIALEAH/PRESTON IPA PROVEMENTS PROfECTIr 9650041 DESMPTION: Cunsbuct pump station can of the reservoir outside the aansmission loop;construct five+nega-sal elevated remote storage,new lahara"and filter backwash water tank instal'_two emergency generators;construct chlorine facilities;and provide various upgrades m plont and remote storage LOCATION: 700 W 2 Ave and 1100 W 2 Ave DisWoct looted: 6 Hialeah Districts)Served: Systemwide REVENUE SCHEDULE PRIOR 2020-ZL 2021-ZZ ZRZ-23 Z023-24 2024-25 2W546 FUTURE TOTAL Future WASD Revenue Bands 0 10,552 9,763 10,662 1.500 0 0 0 32.477 Be,,WASD cnue Bonds Sold 26,362 0 0 0 0 0 0 0 Z6,362 TOTALREVENUES: 26,362 10,552 9,763 10,662 115M 0 0 0 58,239 EXPENDITURE SCHEDULE PIBOR 20ZO-21 20Z1-Z2 2OZ2 73 Z0Z3.20 Z024-Z9 M546 FUTURE TOTAL Constrrcton 24,216 10,463 9,177 10,022 1A10 0 0 0 S5,M Planning and Design 1,546 609 U6 640 90 0 0 0 3531 TOTALEXPENDITIIRES: Z5,76Z 11,152 9,763 10,662 1,500 0 0 0 SBAM Estimated Annual Operating Impact will begin in FY ZDZZ-23 in the amount of S15,000,0W and irides 0 FTE) Source: MDWASD Adopted FY 2020-2026 Capital Budget and Multi-Year Capital Plan The water supply projects included in the MDWASD Adopted FY 2020-2026 Capital Budget and Multi-Year Capital Plan stated in this Section 5 and in Appendix B will be included in the City's work plan by reference. The reference to the MDWASD's data will be incorporated into the City's 2025 Comprehensive Plan with an adopted policy. Table 8 summarizes the Capital Improvement Projects pertaining to the City of Miami Beach water system that are currently in the adopted budget for FY 2021-2025. Refer to Appendix C for pages 75-76 of the CMB Adopted FY 2021-2025 Capital Improvement Plan for projects related to water infrastructure. City of Miami Beach 20 10-Year Water Supply Facilities Work Plan We are committed to providing excellent public service and safety to all who live work and play in our vibrant, tropical,historic community. Page 595 of 1313 "BEACH j Goals, Objectives, and Policies January 2022 RISING FINAL ABOVE Table 8: City of Miami Beach Capital Improvement Projects(2021 —2025) Previous,Years Project Description Cost SCADA and PLC Systems $ 6,000,500 Water&Wastewater Mains and Rehab $ 17,000,000 Water Meter Replacement $ 11,104,893 Water Pump Stations Improvements $ 1,000,000 Total $ 35,105,393 FY202012021 Project.Description Cost SCADA and PLC Systems $ .1,237,500 Water&Wastewater Mains and Rehab $ 9,417,709 Water Meter Replacement $ 5,000,000 Water Pump Stations Improvements $ 4,595,000 Total $ 9,596,000 FY202112022 Project Description Cost Water Pump Stations Improvements $ 4,710,396 Total $ 4,710,396 The SCADA and PLC Systems project is for the City water, wastewater, and stormwater infrastructure. The water infrastructure cost for SCADA is approximately$406,300 for I Y 2020. The City hired Hazen and Sawyer in 2018 to develop the City of Miami Beach Water Master Plan (dated October 2019) and prioritize water projects over a 25-year planning period. Based on the 2019 CMB Water Master Plan and other previously identified projects, the City proposed a five- year Critical Needs Capital Plan for water and wastewater system improvements, summarized in Table 9 per Resolution 2020-31211. Refer to Appendix D for a copy of Resolution 2020-3121, adopted in March 2020. Out of the total of $122.3 Million, approximately $37.5 Million were previously funded. The water projects in Table 9 include the following:Water&Wastewater Mains and Rehab, SCADA & PLC, Water Meter Replacement, Pump Station Improvements and Valve Assessment and Replacement Program. Individual 2019 Water Master Plan projects and schedule are listed in the attached Resolution 2020-3121, under Water Critical Needs Priority List table page 548 of 1097. City of Miami Beach 21 10-Year Water Supply Facilities Work Plan We are committed to providing excellent public service and safety to all who live work and play in our vibrant, tropical, historic community Page 596 of 1313 Fit.ACH j Goals, Objectives, and Policies January 2022 RISING FINAL ABOVE Table 9: Proposed 5-Year Critical Needs Capital Plan (W&WW) Prolact PiE JW TITLE FY2D Est Cost FY21 Est.fast FM Est.Cost FY23 Est.Cod FY7A Est Cos! Tow &Wastewater Maim and Rehab I I 'S 1603,000•$ 10.277,855•S 14,214,469 $ 1S,441,872 '$ 15,268,653 $ 71.295,848 oter Pump Station Improvements $ 5S92,900 1$ 4,710,396 1 $ 10,303,296 estewater Stations Rehab, 1 S 11ANA00'$ 5,209,019 i ! $ 26,312,419 alveAssessment&Repluement PrWam I I Ii $ 900,= $ 927,000 $ 954,810• $ 2,781,810 Pump Station Odor Control $ 850,600 i $ 8501600 &PW(Was onm $ L525,250. $ 1,625,250 astewater Manhole Rehab. $ I,500,000 $ 1,545,000. $ 1,591,350+$ 1,639,091 $ 1,688,263°5 7,963,704 ater Meter Replacement $ 11,104,893 $ 11,304,893 TOTAL $ 122,237,819 Source:Resolution 2020-31211 Table 10 below indicates currently unfunded capital improvement projects that have been identified for the improvement of the City's water booster pump stations, and that are planned to be funded as capital projects in the future. These R&R estimates are for replacing pump station components at the end of their useful life and are currently being covered by the operational budget. The budget amounts indicated in Table 10 were developed based on the remaining useful life of the existing pump station components, in 2019 dollars, and adjusted for inflation at the respective end of their useful life. Table 10:Water Projects Totals Per Year(2020—2025) Pump 2020 2021 2022 2023 2024 2025 Station R&R —PS Components $430,326 $748,804 $ 2,100,414 $ 728,998 $ 484,336 $ 1,334,714 Estimate City of Miami Beach 22 10-Year Water Supply Facilities Work Plan We are committed to providing excellent public service and safely to all who live work and play in our vibrant, tropical, historic community Page 597 of 1313 Goals, Objectives, and Policies January 2022 RISING FINAL ABOVE 6. GOAL, OBJECTIVES, AND POLICIES These are the relevant Goals, Objectives, and Policies in the 2040 Miami Beach City's Comprehensive Plan: 6.1 FUTURE LAND USE ELEMENT The City of Miami Beach wants to preserve and enhance the character of Miami Beach and its quality of life through the implementation of future land use and land development requirements that maximize the potential for economic benefit and the enjoyment of natural and man-made resources,while minimizing the threat to health, safety ar,J welfare posed by hazards, nuisances, incompatible land uses, and environmental degradation. 6.1.1 OBJECTIVE RLU 1.2: LAND REGULATION Future growth and development, redevelopment and rehabilitation will be managed through the preparation, adoption, implementation, and enforcement of land development regulations (LDR) consistent with the Comprehensive Plan and with Section.163.3202, F.S. 6.1.7.1 POLICY RLU 1.2.1 The City shall adopt and maintain Land Development Regulations and zoning districts that are based on the principles, goals, objectives, and policies; future land use categories; and maximum densities and intensities established by this plan. 6.1.2 GOAL RSE 1: RESILIENT DEVELEOPMENT/ADAPTATION ACTION AREA Increase the City's resiliency to the impacts of climate change and rising sea levels by developing and implementing adaptation strategies and measures in order to protect human life, natural systems and resources and adapt public infrastructure, services, and public and private property. 6. 1.2.7 POLICY RSE 1. 1.1 The City shall continue to review and amend its Comprehensive Plan, Land Development Regulations, City Code of Ordinances, and other documents where feasible and appropriate in order to implement best practices that are identified through the review of adaptation strategy publications, including the Resilient 305 Strategy, Miami Beach Strategic Plan Through the Lens of Resiliency, Miami-Dade County GreenPrint, Southeast Florida Regional Climate Action Plan, and The President's Climate Action Plan as well as other regional strategic plans, disaster mitigation plans, water management plans, transportation/transit plans, and climate change plans. City of Miami Beach 23 10-Year Water Supply Facilities Work Plan We are committed to providing excellent public service and safety to all who live work and play in our vibrant, tropical, historic community Page 598 of 1313 r./�,<-} . j Goals,Objectives, and Policies January 2022 RISING FINAL ABOVE 6. 1.2.2 POLICY RSE 1. 1.2 Based on evolving rising seas data and associated vulnerabilities, to allow for flexible adjustments, preserve future strategic adaptation implementation options to maintain maximum resiliency in response to new risks and vulnerabilities. The City will take advantage of new emerging data and technological opportunities. The City's basis for measuring sea level rise shall be as per the Southeast Florida Regional Climate Action Plan, as may be revised from time-to- time by the Southeast Florida Regional Climate Change Compact. 6. 1.2.3 POLICY RSE 1.1.3 The City shall support and engage with educational institutions researching climate change, urban resilience, and adaptation strategies to attract and foster innovation and promote the City as a living laboratory. 6. 1.2.4 POLICY RSE 1.1.4 The City will develop and implement adaptation strategies to coastal flooding, extreme precipitation, tidal events, storm surge, flash floods, stormwater runoff, salt water intrusion and other impacts related to climate change or exacerbated by sea level rise, with the intent to increase the community's comprehensive adaptability and resiliency capacities, which include: a.Adaptation Strategies: Strategies that involve"hard"and"soft"structurally defensive measures to mitigate impacts of rising seas in order to decrease vulnerability while allowing structures and infrastructure to remain unaltered. Two examples are shoreline armoring and beach re- nourishment. Protection strategies may be targeted for areas of a community that are location- dependent and cannot be significantly altered or relocated, such as areas of historical significance, or water-dependent uses. Protection is the priority and initial response by City government and the preferred response. b. Living with Water Strategies: Strategies that reduce the risk of damage from water by altering the design through measures such as elevation or stormwater improvements, to allow the structure of infrastructure system to stay intact. Rather than preventing flooding or inundation, these strategies aim to reduce potential risks, and accommodate water. c. Management Strategies: Strategies that involve the actual removal of existing development, their possible relocation to other areas, and/or prevention of further development in high-risk areas. This is intended to be a long-term strategy and reduce the risk when making development decisions. d. Avoidance: Strategies that involve ensuring development does not take place in areas subject to coastal hazards associated with sea level rise or where the risk is low at present but will increase over time. City of Miami Beach 24 10-Year Water Supply Facilities Work Plan We are committed to providing excellent public service and safety to all who live work and ploy in our vibrant, tropical, historic community Page 599 of 1313 tv'` '-.I; j Goals, Objectives, and Policies January 2022 RISING FINAL ABOVE e. Other options within this Element. 6.2 INFRASTRUCTURE ELEMENT 6.2.1 OBJECTIVE INF 1.1: PRIORITIES The City will continue to provide potable water supply, sanitary sewage disposal, solid waste disposal and drainage services to meet both existing and projected needs as identified in this plan through coordination and implementation of those projects listed in the Capital Improvements Element. All improvements for replacement, expansion or increase in capacity of facilities shall conform with the adopted policies of thi's Plan including level of service standards for the facilities. 6.2. 1.1 POLICY INF 1.1. 1 Continue to participate with Miami-Dade County WASD through program cooperation with the Virginia Key Wastewater plant, the Hialeah/Preston Water Treatment Plant and the Resource Recovery Plant and continue to accept wastewater from municipalities north of the City of Miami Beach. 6.2.1.2 POLICY INF 1.1.3 The potable water network is an interconnected, countywide system; therefore, the City will cooperate with MDWASD to jointly develop methodologies and procedures for biannually updating estimates of system demand and capacity and ensure that sufficient capacity to serve development exists. The City will prepare and submit a Water Conservation Plan to the County at the same time as the City submits the updated 5-Year Water Supply Facilities Work Plan. Last sentence of POLICY INF 1.1.3 will be amended in the City's 2040 Comprehensive Plan by reference as stated below: The City will prepare and submit a Water Conservation Plan to the County at the same time as the City submits the updated 10-Year Water Supply Facilities Work Plan. 6.2.1.3 POLICY INF 1.5.1 The following City-wide Level of Service Standards shall be used as the basis for determining the availability of facility capacity for residential uses; the systems shall be able to provide/accommodate at least the minimums specified: City of Miami Beach 25 10-Year Water Supply Facilities Work Plan We are committed to providing excellent public service and safety to all who live work and play in our vibrant, tropical, historic community Page 600 of 1313 L?i�r (-N j Goals,Objectives,and Policies January 2022 RISING FINAL ABOVE Facility/Service Area Level of Service Standard Sanitary Sewer Facilities Sewage Generation Standard 140 Average gallons per capita per day Solid Waste Facilities Solid Waste Generation Standard 1.275 tons per capita per year Drainage Facilities Design Storm Standard per Storm Water Master Plan as updated from time to time. Potable Water Facilities Water Consumption Standard 246 Average gallons per capita per day The average gallons per capita rate applies to the year-round standard, while the peak gallons per capita rate applies to the City during peak tourist period due to the significant seasonal influx of temporary residents. The City uses a multiplier of 1.2,which gives a 20% increase in population to estimate required services and facilities. The following City-wide Level of Service Standards shall be used as the basis for determining the availability of facility capacity for non-residential uses; the systems shall be able to provide/accommodate at least the minimums specified: Hotel: 75 gallons per day per room Office: 0.084 gallons per day per square foot Retail: 0.18 gallons per day per square foot Industrial: 0.084 gallons per day per square foot Restaurant: 65 gallons per day per seat School: 12 gallons per day per student POLICY INF 1.5.1 will be amended in the City's 2040 Comprehensive Plan by reference as stated below: Potable Water Facilities Water Consumption Standard 156 Average gallons per capita per day 6.2.2 OBJECTIVE INF 1.8: WATER SUPPLY PLANNING The City of Miami Beach shall comply with its 10-year Water Supply Facilities Work Plan, as required by section 163.3177(6)(c), F.S. The Work Plan will be updated, at a minimum, every 5 years. The City of Miami Beach Water Supply Facilities Work Plan is designed to: assess current and projected potable water demands; evaluate the sources and capacities of available water City of Miami Beach 26 10-Year Water Supply Facilities Work Plan We are committed to providing excellent public service and safety to all who live work and play in our vibrant, tropical,historic community Page 601 of 1313 �- F 1 Goals, Objectives, and Policies January 2022 RISING FINAL ABOVE supplies; and identify those water supply projects, using all available technologies, necessary to meet the City's water demands for a 10-year period. 6.2.2.1 POLICY INF 1.8. 1 The City will comply with the "City of Miami Beach, Florida 10-year Water Supply Facilities Work Plan," adopted on October 27, 2010, and incorporate such work plan into the Miami Beach Comprehensive Plan. POLICY INF 1.8.1 will be amended in the City's 2025 Comprehensive Plan by reference as stated below: The City hereby adopts by reference the "City of Miami Beach, Florida 10-year Water Supply Facilities Work Plan," into the City's Comprehensive Plan, dated xxx, for planning period of not less than 10 years. The Work Plan addresses issues that pertain to water supply facilities and requirements needed to serve current and future development within the City. 6.2.2.2 POLICY INF 1.8.2 Coordinate appropriate aspects of its comprehensive plan with the South Florida Water Management District's regional water supply plan adopted November 8, 2018 and with the Miami- Dade County 20-Year Water Supply Facilities Work Plan adopted February 5, 2015, and as updated. The City shall amend its Comprehensive Plan and Work Plan as required to provide consistency with the District and County plans. POLICY INF 1.8.2 will be amended in the City's 2025 Comprehensive Plan by reference as stated below: Coordinate appropriate aspects of its comprehensive plan with the South Florida Water Management District's regional water supply plan approved November 8, 2018 and with the Miami-Dade County 20-Year Water Supply Facilities Work Plan adopted February 5, 2015. 6.2.2.3 POLICY INF 1.8.3 The City shall coordinate the planning of potable water and sanitary sewer facilities and services and level-of-service standards within the Miami-Dade County Water and Sewer Department, DERM, the South Florida Water Management District, and will update the City's Work Plan within 18 months after the South Florida Water Management District updates the Lower East Coast Water Supply Plan Update. 6.2.2.4 POLICY INF I.BA The City shall coordinate with Miami-Dade County WASD by requiring applications to be reviewed by WASD during the site plan review process prior to approving a Building Permit, in order to City of Miami Beach 27 10-Year Water Supply Facilities Work Plan We are committed to providing excellent public service and safely to all who live work and play in our vibrant, tropical,historic community Page 602 of 1343 Goals, Objectives,and Policies January 2022 RISING FINAL ABOVE determine whether adequate water supplies will be available to serve the development by the anticipated issuance date of the certificate of occupancy for properties located within the City of Miami Beach. Additional coordination efforts will occur between WASD and the City through the water allocation system. Monthly Building Permit data will be provided to WASD to track development activity within the City. The City will monitor proposed amendments to the Miami-Dade County Comprehensive Development Master Plan as they relate to water supply planning in the adjacent beach communities and provide input as necessary. 6.2.2.5 POLICY INF 1.8.5 The City Planning Director or a representative will attend the Miami-Dade Planners Technical Committee meeting to share information regarding water supply needs and coordinate water use issues as needed. The Planners Technical Committee is a council of professional planners representing local governments and public regulatory/review agencies in Miami-Dade County that addresses common concerns and shares resources toward solving planning problems. 6.2.2.6 POLICY INF 1.8.6 (TO BE INCORPORATED) New Policy to be adopted by reference that incorporates the Draft 2020 Miami-Dade County Work Plan Update into the City's Comprehensive Plan: The City hereby adopts by reference the Draft Miami-Dade Water and Sewer Department 10- Year Water Supply Facilities Work Plan, dated October 2020, for a planning period of not less than 10 years. The Work Plan addresses issues that pertain to water supply facilities and requirements needed to serve current and future development within the City's water service area. The City shall review and update the Work Plan at least every 5 years, within 18 months after the Governing Board of the water management district approves an updated regional water supply plan. Any changes affecting the Work Plan shall be included in the annual Capital Improvements Plan update to ensure consistency between the Potable Water Sub-Element and the Capital Improvements Element. 6.2.3 OBJECTIVE INF 1.9 Implementation of the 10-year Water Supply Facilities Work Plan will ensure that adequate water supplies and public facilities are available to serve the water supply demands of the City's population. 6.2.4 OBJECTIVE INF 1.9.1 If in the future there are issues associated with water supply, conservation or reuse the City will immediately contact WASD to address the corresponding issue(s). In addition, the City will follow City of Miami Beach 28 10-Year Water Supply Facilities Work Plan We are committed to providing excellent public service and safety to all who live work and play in our vibrant, tropical,historic community Page 603 of 13'(3 I t j Goals,Objectives,and Policies January 2022 RISING FINAL ABOVE adopted communication protocols with WASD to communicate and/or prepare an appropriate action plan to address any relevant issue associated with water supply, conservation or reuse. 6.2.5 OBJECTIVE INF 1.9.2 The City will require the use of High Efficiency Toilets; High Efficiency Showerheads; High Efficiency Faucets; High Efficiency Clothes Washers;and Dishwashers that are Energy Star rated and Water Sense certified in all new and redeveloped residential projects. 6.2.6 OBJECTIVE INF 1.9.3 The City should educate the development community on the benefits of sub-metering for multi- family residential retrofit projects which will include separate water meters and monthly records kept of all major water-using functions such as cooling towers and individual units. The City will explore starting a pilot incentive program as a means of encouraging developers that retrofit units to install separate meters and high efficiency appliances. The City will require new multi-family residential developments to install separate water meters for each unit. 6.2.7 OBJECTIVE INF 1.9.4 The City will educate the development community on the water saving benefits of the use of Florida Friendly Landscapes guidelines and principles; gutter downspouts, roof runoff, and rain harvesting through the use of rain barrels and directing runoff to landscaped areas; drip irrigation or micro- sprinklers; and the use of porous surface materials (bricks, gravel, turf block, mulch, pervious concrete, etc.)on walkways, driveways and patios. 6.2.8 OBJECTIVE INF 1.9.5 The City will participate, when warranted, in the SFWMD's Water Savings Incentive Program (WaterSlP)for large-scale retrofits as recommended by the Lower East Coast Water Supply Plan. 6.2.9 OBJECTIVE INF 1.9.6 The City will continue to enforce the landscape watering restrictions mandated by the South Florida Water Management District. The City will continue to use code enforcement measures such as issuing warning and fines to enforce the water restrictions. 6.2.10 OBJECTIVE INF 1.9.7 The City will continue to coordinate with Miami-Dade Water and Sewer Department related to leak detection and repair of water lines throughout the City. City of Miami Beach 29 10-Year Water Supply Facilities Work Plan We are committed to providing excellent public service and safety to oil who live work and play in our vibrant, tropical,historic community Page 604 of 1313 r� Goals, Objectives, and Policies January 2022 RISING FINAL ABOVE OBJECTIVE INF 1.9.7 will be amended in the City's 2025 Comprehensive Plan by reference as stated below: The City will continue to coordinate with DERM related to leak detection and repair of water lines throughout the City. 6.3 CONSERVATION ELEMENT 6.3.1 OBJECTIVE INF 1.6: WATER CONSERVATION Cooperate with WASD to continue to implement the City's comprehensive water conservation program to ensure that a sufficient, economical supply of fresh water is available to meet current and future demand for potable water. 6.3.1.1 POLICY INF 1.6.6 The City, through the Building Department, will continue to enforce the requirement to use high efficiency volume water saving devices for substantial rehabilitation and new construction projects as specified in the standard plumbing code.All future development within the City will be required to comply with water use efficiency techniques for indoor water use in accordance with Section 8- 31, 32-83.1, 32-84 and 8A-381 of the Code of Miami-Dade County. In addition, all future development will be required to comply with the landscape standards in Section 18-A and 18-B of the Miami-Dade County Code. 6.4 INTERGOVERNMENTAL COORDINATION ELEMENT Establish strategic partnerships and coordinate development and policy review processes among the various governmental, public and private entities to address service needs, infrastructure, and climate resiliency in the region. 6.4.1 OBJECTIVE ICE 1.1: COORDINATION MECHANISMS Provide a formal process for intergovernmental coordination among the city and local, regional, State and Federal governmental entities and agencies to establish specific coordination activities to occur on a regular basis. 6.4.1.7 POLICY ICE 1. 1.8 The City will coordinate with Miami-Dade County WASD in the review of site plans prior to the issuance of a building permit to determine whether adequate water supplies will be available to serve new development no later than the date of the certificate of occupancy. City of Miami Beach 30 10-Year Water Supply Facilities Work Plan We are committed to providing excellent public service and safety to all who live work and play in our vibrant, tropical, historic community Page 605 of 13b Goals, Objectives, and Policies January 2022 RISING FINAL ABOVE 6.4. 7.2 POLICY ICE 1. 1.9 The City shall coordinate the planning of potable water and sanitary sewer facilities and services and level of service standards within the Miami-Dade County WASD, DERM, the South Florida Water Management District, and the Lower East Coast Water Supply Plan Update. 6.4.1.3 POLICY ICE 1.1. 12 The City will collaborate and coordinate with appropriate local, regional, state, and national governmental agencies and establish strategic partnerships where feasible to address climate resiliency as guided by the Goals, Objectives, and Policies of the Resiliency and Sustainability Element. 6.4.1.4 POLICY ICE 1.1.13 The City will continue to coordinate with Miami-Dade County and the City of Miami to implement the Resilient 305 Strategy. 6.5 CAPITAL IMPROVEMENT ELEMENT 6.5.1 OBJECTIVE CIP 1.3: IMPACT FEE PROGRAM Continue to participate in the Miami-Dade County Development Impact Fee Program to secure a financial contribution from any development that necessitates new or expanded potable water, sanitary and storm sewer, transportation, and solid waste based on a proportional share of the cost of the improvements. 6.5. 1. 1 POLICY CIP 1.5.3 The City shall continue to maintain and provide potable water, sanitary sewer, solid waste disposal and drainage facilities at adopted level of service standards to ensure that adequate facility capacity is available for at and existing commercial and residential developments within its jurisdiction. These level of service standards are established in this Plan's Infrastructure Element. POLICY CIP 1.5.3 will be amended in the City's 2025 Comprehensive Plan by reference to include the Level of Service Standards included in the Work Plan's Infrastructure Element to be adopted for all infrastructure facilities, including potable water facilities. 6.5.2 OBJECTIVE CIP 1.6: INFRASTRUCTURE EXPENDITURES Limit public infrastructure expenditures that subsidize development in the City-wide Coastal High Hazard Area except for restoration and enhancement of natural resources; the measure shall be City of Mibmi Beach 31 10-Year Water Supply Facilities Work Plan We are committed to providing excellent public service and safety to all who live work and play in our vibrant, tropical, historic community Page 606 of 13b F.-ACH j Goals, Objectives, and Policies January 2022 RISING FINAL ABOVE 0 projects inconsistent with Policies 1.6.1 through 1.6.5 and 1.8.1 in the Capital Improvement Schedule. 6.5.2. 1 POLICY CIP 1.6.3 The City will continue to expend funds as needed to maintain, repair, renew, replace or expand storm water drainage and pump system facilities. 6.5.2.2 POLICY CIP 1.6.4 The City will continue to expend funds as needed to maintain, repair, renew, replace or expand recreational, beach access and water access facilities. 6.5.2.3 POLICY CIP 1.6.5 The City will continue to expend funds as needed to maintain,' repair, renew, replace or expand facilities that protect the dune system or other environmental assets to support efforts of climate resiliency and natural habitat preservation. J City of Miami Beach 32 10-Year Water Supply Facilities Work Plan We are committed to providing excellent public service and safety to all who live work and play in our vibrant, tropical, historic community Page 607 of 1313 ''F +��~j 1 Goals, Objectives, and Policies January 2022 RISING FINAL ABOVE 7. REFERENCES 1. Hazen and Sawyer. (2019). Water System Master Plan. 2. Miami-Dade Water and Sewer Department. (2014). 20-Year Water Supply Facilities Work Plan (MDWASD 2014—2033). 3. Miami-Dade Water and Sewer Department. (2020). Adopted FY 2020-2026 Capital Budget and Multi-Year Capital Plan 4. KCI. (2019). 2040 Miami Beach Comprehensive Plan. 5. South Florida Water Management District. (2018). Lower East Coast Water Supply Plan Update. City of Miami Beach 33 10-Year Water Supply Facilities Work Plan We are committed to providing excellent public service and safety to all who live work and play in our vibrant,tropical,historic community Page 608 of 1313 Appendices January 2022 RISING FINAL ABOVE APPENDIX A Figures City of Miami Beach Public Works Department Infrastructure Division Emergency Response Plan We are committed to providing excellent public service and safety to all who live work and play in our vibrant, tropical, historic community. Page 609 of 1343 BROWARD.p MIAMI-DADE i 5'. - C-1W. _ r { r.-1 a. ) Current 2016 1.Americana Village 6.MDWASD(South Dade) Mc�Yo 1. 2. Florida City WSD 7.North Miami, City of 3. Homestead,City of 8.North Miami Beach,City of 4. MDWASD(Alexander Orr Jr.) Domestic and Small Public Supply 0 1 2 4 h' F. 5.MDWASD(Hialeah-Preston) Miles .W WmOpw'O'aoaFGS.G�7!¢,YIS'1tOP)gLEGW�PN¢PYGWrMN—I.SVnO�t0100�I3�a Figure 2 Current(2016)public water supply utility service areas in Miami-Dade County. Source: 2018 LEC Plan Appendices Page 610 of 1313 N, '.; 0 I B E AC H RISING ABOVE Miami Gardens 1F Intura Golden Beach Noeac'Miami B r� ,tww eaeh Sunny Isles �0}�4raa Miami Lakes a Opa•locka North Miami Bal Harbour Village Hialeah Gardens Biscayne Pa k Bay Harbor Islands Medley Hialeah j Off!Shores f I-Portal North. ay Surfside — Village Indian Creek Village Doral Miami Springsi Virginia•Gardens € City of Miami Beach Miami Beach Tw�Sweetwater 4 Miami d We�t.Miami Q or [ s ,•. Gables mw mr South.Miami ■r..rwra.-.■ Key Biscayne Pinecrest Palmetto Bay Or NowtO.fM NpItM Miami-Dade County Municipalities .`� a 2.5 5.0 Homestead Florida City Figure 1 City of Miami Beach Water Service Area City of Miami Beach Source: CMB 2019 Water Master Plan Page 611 of 1313 �b L'R.FFK Nra rbS ///� - �•,tnra: 24"Interconnect m 24"Water Main g C S 5 s m n:wnme Y 36'Water Main : 36"Intercon CJ��++►► I .. r=•�n.no ®�urm o oQ na . U � F 4- 1 6 36"Interconnect 36"Water Main 16"Water Mains 36"Interconnect e m � (2)20"water Mains , 20"Interconnect O :. -E r,4'gro a �.:._•, LEGEND SERVICE AREA �f+ 0 OPEN WATER INTERCONNECTIONS fl O —WATER MAIN ken 0 028 0.55 1.1 1.85 22 Esri, Gannin,(c)OpenStreetMap contributors,and the GIS user community D � O- Figure 3 < D Water Supply Interconnects with MDWASD �! 71 Source:CMB 2019 Water Master Plan Page 612 o(1313 r '` `BFAC,H I Appendices January 2022 RISING FINAL ABOVE APPENDIX B MDWASD Adopted FY 2020-2026 Capital Budget and Multi-Year Capital Plan City of Miami Beach Public Works Department Infrastructure Division Emergency Response Plan We are committed to providing excellent public service and safely to oil who live, work and play in our vibrant, tropical, historic community. Page 613 of 1313 MIAMI•D�ADE t:.E:rrcic'tcc'e r,t``Y '.C1zu 1VIIAMI-DADS WATER AND SEWER DEPARTMENT ADOPTED FY 2020-2026 CAPITAL BUDGET AND MULTI-YEAR CAPITAL PLAN BCC APPROVED SEPTEM BER 17, 2020 Prepared by Capital Planning and Coordination Section Page 614 of 1313 FY 2020- 21 Adopted Budget and Multi-Year Capital Plan EXPENDITURE SCHEDULE: PRIOR 2020-22 2021-22 2022-23 2023-24 2024-25 2025-26 FUTURE TOTAL Construction 28,299 11,679 19,741 29,319 23,658 21,791 0 0 134,487 Planning and Design 8,336 614 1,039 1,543 1,245 1,147 0 0 13,924 TOTAL EXPENDITURES: 36,635 12,293 20,780 30,862 24,903 22,938 0 0 148,411 WATER TREATMENT PLANT-AUTOMATION PROJECT#: 963110 Ve DESCRIPTION: Construct facilities and install equipment to automate functions at water treatment plants LOCATION: Systemwide District Located: Systemwide Various Sites District(s)Served: Systemwide REVENUE SCHEDULE: PRIOR 2020-21 2021•72 2022-23 2023-24 2024-25 2025-26 FUTURE TOTAL WASD Revenue Bonds Sold 2,247 0 0 0 0 0 0 0 2,247 TOTAL REVENUES: 2,247 0 0 0 0 0 0 0 2,247 EXPENDITURE SCHEDULE: PRIOR 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 FUTURE TOTAL Construction 877 741 0 0 0 0 0 0 1,618 Planning and Design 341 288 0 0 0 0 0 0 629 TOTAL EXPENDITURES: 1,218 1,029 0 0 0 0 0 0 2,247 WATER TREATMENT PLANT-FLORIDIAN REVERSE OSMOSIS PROJECT#: 966620 DESCRIPTION: Construct a 10-million gallons per day(MGD)Reverse Osmosis Treatment Plant using Upper Floridian Aquifer;the jointly owned plant will equally serve the City of Hialeah and WASD service areas;total cost of $160 million,includes contribution and expenditures of$80 million from City of Hialeah LOCATION: 700 W 2 Ave District Located: 6 Hialeah District(s)Served: Systemwide REVENUE SCHEDULE: PRIOR 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 FUTURE TOTAL Future WASD Revenue Bonds 0 1,000 800 0 0 0 0 0 1,800 WASD Revenue Bonds Sold 647 0 0 0 0 0 0 0 647 Water Connection Charges 5,697 0 0 0 0 0 0 0 5,697 Water Renewal and Replacement 121 0 0 0 0 0 0 0 121 Fund TOTAL REVENUES: 6,465 2,000 800 0 0 0 0 0 8,265 EXPENDITURE SCHEDULE: PRIOR 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 FUTURE TOTAL Construction 6,465 970 776 0 0 0 0 0 8,211 Planning and Design 0 30 24 0 0 0 0 0 54 TOTAL EXPENDITURES: 6,465 1,000 800 0 0 0 0 0 8,265 WATER TREATMENT PLANT-HIALEAH/PRESTON IMPROVEMENTS PROJECT#: 9650041 DESCRIPTION: Construct pump station east of the reservoir outside the transmission loop;construct five-mega-gal elevated remote storage,new laboratory and filter backwash water tank;install two emergency generators;construct chlorine facilities;and provide various upgrades to plant and remote storage LOCATION: 700 W 2 Ave and 1100 W 2 Ave District Located: 6 Hialeah District(s)Served: Systemwide Page 615 of 1313 FY 2020- 21 Adopted Budget and Multi-Year Capital Plan REVENUE SCHEDULE: PRIOR 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 FUTURE TOTAL Future WASD Revenue Bonds 0 10,552 9,763 10,662 1,500 0 0 0 32,477 WASD Revenue Bonds Sold 26,362 0 0 0 0 0 0 0 26,362 TOTAL REVENUES: 26,362 30,5S2 9,763 10,662 11500 0 0 0 58,839 EXPENDITURE SCHEDULE: PRIOR 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 FUTURE TOTAL Construction 24,216 10,483 9,177 10,022 1,410 0 0 0 55,308 Planning and Design 1,546 669 586 640 90 0 0 0 3,531 TOTAL EXPENDITURES: 25,762 11,152 9,763 10,662 1,500 0 0 0 58,839 Estimated Annual Operating Impact will begin in FY 2022-23 in the amount of$15,000,000 and includes 0 FTE(s) WATER TREATMENT PLANT-REPLACEMENT AND RENOVATIONS PROJECT#: 9650161 DESCRIPTION: Renovate and replace water treatment plant facilities and structures within plant sites LOCATION: Water Treatment Plants District Located: Systemwide Various Sites District(s)Served: Systemwide REVENUE SCHEDULE: PRIOR 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 FUTURE TOTAL Future WASD Revenue Bonds 0 545 229 1,000 1,000 0 0 0 2,774 Water Renewal and Replacement 36,008 9,298 1,500 1,500 1,500 1,500 1,500 1,500 54,306 Fund TOTAL REVENUES: 36,008 9,843 1,729 2,500 2,500 1,500 1,500 1,500 57,080 EXPENDITURE SCHEDULE: PRIOR 2020-21 2021-22 2022-23 2023-24 2024-25 202S-26 FUTURE TOTAL Construction 26,328 9,252 9,145 2,350 2,350 1,410 1,410 1,410 53,655 Major Machinery and Equipment 560 197 195 50 50 30 30 30 1,142 Planning and Design 1,120 394 389 100 100 60 60 60 2,283 TOTAL EXPENDITURES: 28,008 9,843 9,729 2,500 2,500 11500 1,500 1,500 57,080 WATER TREATMENT PLANT-SOUTH MIAMI HEIGHTS PROJECT#: 9652822 DESCRIPTION: Construct water treatment plant,wellfields and various water transmission mains in south Miami-Dade County LOCATION: 11800 SW 208 St District Located: 9 Unincorporated Miami-Dade County District(s)Served: Systemwide REVENUE SCHEDULE: PRIOR 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 FUTURE TOTAL Future WASD Revenue Bonds 0 1,100 1,075 1,000 1,000 10,300 0 0 14,475 WASD Revenue Bonds Sold 34,153 0 0 0 0 0 0 0 34,153 TOTAL REVENUES: 34,153 1,100 1,075 1,000 1,000 10,300 0 0 48,628 EXPENDITURE SCHEDULE: PRIOR 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 FUTURE TOTAL Construction 31,080 1,001 978 910 910 9,373 0 0 44,252 Planning and Design 3,073 99 97 90 90 927 0 0 4,376 TOTAL EXPENDITURES: 34,153 1,100 1,075 1,000 1,000 10,300 0 0 48,628 Page 616 of 1313 FY 2020- 21 Adopted Budget and Multi-Year Capital Plan UNFUNDED CAPITAL PROJECTS (dollars in thousands) PROJECT NAME LOCATION ESTIMATED PROJECT COST OCEAN OUTFALLS-CAPACITY PROJECTS Throughout Miami Dade County 1,730,281 OCEAN OUTFALLS-LEGISLATION PROJECTS Throughout Miami Dade County 3,374,000 UNDERSIZED WATER MAINS-REPLACEMENTS Throughout Miami Dade County 15,963 WASTEWATER-COMMERCIAL CORRIDORS ECONOMIC DEVELOPMENT Throughout Miami Dade County 143,601 WASTEWATER TREATMENT PLANT-CENTRAL DISTRICT IMPROVEMENTS Throughout Miami Dade County 699 WASTEWATER TREATMENT PLANT-SOUTP DISTRICT IMPROVEMENTS Throughout Miami Dade County 6,075 WATER-COMMERCIAL CORRIDORS ECONOMIC DEVELOPMENT Throughout Miami Dade County 480,016 WATER INFRASTRUCTURE-VARIOUS IMPROVEMENTS Throughout Miami Dade County 5,700 WATER TREATMENT PLANT(ALEX ORR)-IMPROVEMENTS Throughout Miami Dade County 33,863 WATER TREATMENT PLANT(HIALEAH)-IMPROVEMENTS Throughout Miami Dade County 21,620 WATER TREATMENT PLANT(PRESTON)-IMPROVEMENTS Throughout Miami Dade County 57,331 WATER TREATMENT PLANTS-NEW FACILITIES SOUTH MIAMI AND Throughout Miami Dade County 690,818 SURFACE UNFUNDED TOTAL 3,189,341 Page 617 of 1313 H I Appendices pp January 2022 RISING FINAL ABOVE APPENDIX C City of Miami Beach Adopted FY 2021-2025 Capital Improvement Plan City of Miami Beach Public Works Department Infrastructure Division Emergency Response Plan We are committed to providing excellent public service and safety to all who live, work and play in our vibrant, tropical,historic community. Page 618 of 1313 ADOPTED FY 2021 -202 5 CAPITAL IMPROVEMENT PLAN & FY2021 CAPITALBUDGET ir - r -:��-'=Firm..- �_ � ,.; � -.�.�� •ra` .. .y . cYx may, �nfic � — �� uYev. �r -4s IA IB M E H Miami Beach Redevelopment Agency, Florida . V � y ® i i➢ � H A n tD t T k FY 2021 -2025 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY �� CITY OF MIAMI BEACH PROJECT PROJECT NAME Previous Years FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future Total PROJ FNDED BY OPER FDS 20527 FDOT U11LITES RELOCATION - 221,175 - - - - 221,175 20607 11TH STREET-FLAMINGO NEIGHBORHOOD 40.468 - 40,468 23000 SUNSET HARBOUR PUMPSTATION UPGRADES 1,013,016 1,013,016 23360 WEST AVE/BAY RD NEIGHBORHOOD 376,706 - 376,706 27370 541N DIAMETER REDUNDANT SEWER FORCE 2,370.395 2,370,395 28120 WATER PUMP STATIONS IMPROVEMENTS 1,000,000 - - 1,000,000 28220 WASTEWATER MANHOLE REHABILITATION 1,500,000 1,545,000 1,591,350 - 4,636,350 28320 SEWER PUMP STATION ODOR CONTROL 850,600 - - 850,600 28420 SWR PUMP STATION#18 IMPROVEMENTS 700,000 700,000 1,400,000 28520 WATER&WASTEWATER MAINS AND REHAB - 140,889 140,889 60319 WATER METER REPLACEMENT PROGRAM 9,104,893 - - 9,104.893 60419 DERM&EPA CONSENT DECREE 900,000 500,000 500,000 500.000 500,000 2,900,000 63918 PUBLIC WORKS FACILITY RENOVATION 106,890 - - - - 106,890 66818 WATER STATION ROOF REPLACEMENT 30,000 - 30,000 Fund Total: 3, 061.3580 - r :. _ r 419 2017 WATER&SEWER BONDS 20527 FDOT UTILITIES RELOCATION 677,529 - - - 677,529 20597 WEST AVENUE PHASE II 18,333.671 - 18.333.671 20607 11TH STREET-FLAMINGO NEIGHBORHOOD 2,495,457 2,495,457 20619 WASTE WATER STATIONS REHABILITATION 4,500,000 6.603,400 11,103,400 20719 SCADA AND PLC SYSTEMS 3,137,750 - 3,137,750 21270 VENETIAN NEIGHBORHOOD-ISLANDS 597.022 - - 697,022 23000 SUNSET HARBOUR PUMPSTATION UPGRADES 539,631 - - - 539,631 23220 NORTH SHORE NEIGHBORHOOD IMPROVEMENTS 138,427 - 138,427 23240 LA GORCE NEIGHBORHOOD IMPROVEMENTS 297,347 - _ 297,347 23360 WEST AVE/BAY RDNEIGHBORHOOD 110.000 110,000 23380 PALM&HIBISCUS ISLAND ENHANCEMENT 3,963.099 - 3,963,099 27370 541N DIAMETER REDUNDANT SEWER FORCE 3,997.327 - 3,997,327 28120 WATER PUMP STATIONS IMPROVEMENTS - 4,595,000 4,595,000 28520 WATER&WASTEWATER MAINS AND REHAB 17,000,000 9.276,820 26,276,820 28940 BAYSHORE NEIGHBORHOOD CENTRAL-SOUTH 3,616,516 - 3,616,516 60319 WATER METER REPLACEMENT PROGRAM 2,000,000 5,000,000 - - 7,000,000 65421 VALVE REPLACEMENT PROGRAM - 931,635 959,584 - 1,891,219 Fund Total Page 620 of 1313 75 1•' FY 2021 -2025 CAPITAL IMPROVEMENT PLAN BY FUNDING SUMMARY CITY OF MIAMI BEACH PROJECT PROJECT NAME Previous Years FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future Total 02009-27243 20527 FDOT UTILITIES RELOCATION - 178,825 - - - 178,825 21270 VENETIAN NEIGHBORHOOD-ISLANDS 2,766,100 - - - 2,766,100 22050 BAYSHORE NEIGHBORHOOD BID PACK A 3,895.513 - - 3,895,513 23000 SUNSET HARBOUR PUMPSTATION UPGRADES 2,500,062 - - 2,500.062 23180 BAYSHORE NEIGHBORHOOD BID PACK D 2,850,793 - 2,850,793 23220 NORTH SHORE NEIGHBORHOOD IMPROVEMENTS 2,368,323 - 2,368,323 23360 WEST AVE/BAY RD NEIGHBORHOOD 1,632.360 - - 1,632,360 23380 PALM&HIBISCUS ISLAND ENHANCEMENT 2,547,712 - - - 2,547,712 27370 541N DIAMETER REDUNDANT SEWER FORCE 566 _ 566 Fund Total i� i SIR¢422 WATER AND SEWER IMPACT FEES 23180 BAYSHORE NEIGHBORHOOD BID PACK D 97,000 97,000 Fund Total: 97' • .. .4�0: 2006423 GULF BREEZE 21270 VENETIAN NEIGHBORHOOD-ISLANDS 1,134.463 - 1,134.463 22050 BAYSHORE NEIGHBORHOOD BID PACK A 765,052 765,052 23240 LA GORCE NEIGHBORHOOD IMPROVEMENTS 56,000 - 56.000 23380 PALM&HIBISCUS ISLAND ENHANCEMENT 2,828,927 2,828,927 28940 BAYSIHORE NEIGHBORHOOD CENTRAL-SOUTH 106,792 106,792 Fund Total 424 WATER&SEWER BONDS iii 21270 VENETIAN NEIGHBORHOOD-ISLANDS 3,659,741 - - 3,659,741 22050 BAYSHORE NEIGHBORHOOD BID PACK 2,893,609 - 2,893,609 23180 BAYSHORE NEIGHBORHOOD BID PACK D 777,897 - - 777,897 23220 NORTH SHORE NEIGHBORHOOD IMPROVEMENTS 2,024,360 - - - 2,024,350 23240 LA GORCE NEIGHBORHOOD IMPROVEMENTS 524,662 - 524,662 23300 FLAMINGO NEIGHBORHOOD-SOUTH 1,211,126 - 1,211,126 23360 WESTAVE/BAY RD NEIGHBORHOOD 1,063,111 - - - 1,063.111 23380 PALM&HIBISCUS ISLAND ENHANCEMENT 1,222,509 - 1,222,509 27370 54IN DIAMETER REDUNDANT SEWER FORCE 78,434 - 78,434 28940 BAYSHORE NEIGHBORHOOD CENTRAL-SOUTH 1,715 - 1,715 Fund Total 425 WATER AND SEWER ENTERPRISE FUN 21270 VENETIAN NEIGHBORHOOD-ISLANDS 1,529,777 1,529,777 22050 BAYSHORE NEIGHBORHOOD BID PACK A 50,770 Pa21 of 1313 5o,no 23180 BAYSHORE NEIGHBORHOOD BID PACK D 3 8 - - - - - - 358,785 76 CITY OF MIAMI BEACH �',;/ k ==: '',, �, ,� �• i FY 2021 -2025 Capital Budget and 5-Year Capital Improvement Plan F.:Qnlltall .:. �•. ` SCADA AND PLC SYSTEMS UTILITIES Project Number: 20719 Department: PW ENGINEERING Location: CITYWIDE Description: SCADA and PLC Replacement for Water,Wastewater,and Stormwater Pumping Stations.This Project began in FY 2016/17 and may heed additional funding to insure project completion. The original scope in last years budget proposed$2,500,000 for the SCADA and$250,000 for the PLC replacement.Estimations may have been inadequate for funding and may need additional funding source to complete the project. Projected date range: 1 0101/201 8 to 12/31/2021 Ilr ltll#111ttlrtyl , Cost Summary Previous Years FY 2020121 FY 2021122 FY 2022123 FY 2023124 FY 2024125 Future Total EQUIPMENT 5,776,434 1,231,343 - - - - 7,007,777 FEASIBILITY STUDY 195,066 - - - 195,066 OIG FUNDING 29,000 6,157 - - - - 35,157 Total: 6,000,500 1,237,500 - - - - 7,238,000 Fund Summary Previous Years FY 2020/21 FY 2021122 FY 2022123 FY 2023124 FY 2024125 Future Total 419 2017 WATER&SEWER BONDS 3,137,750 - - - - - - 3,137,750 429 2017 STORMWATER BONDS 2.862,750 1,237,500 - - 4,100,250 Total: 6,000,500 1,237,500 - - - - 7,238,000 Page 622 of 1313 733 CITY OF MIAMI BEACH 0EACH FY 2021 -2025 Capital Budget and 5-Year Capital Improvement Plan NS VALVE REPLACEMENT PROGRAM UTILITIES Project Number: 65421 Department: PW ADMINISTRATION Location: CITYWIDE Description: This project will provide improvements to the water and sewer system. The improvements will include identification of valves requiring replacement and the performance of a condition assessment,design and replacement in accordance to the CMB Public Works Standards. Projected date range: 10/01/2020 to 12/31/2022 J. Cost Summary Previous Years FY 2020121 FY 2021/22 FY 2022123 FY 2023124 FY 2024125 Future Total CONTRACTED SERVICES REPAIR - 959,584 - - - 959,584 DIG FUNDING 4,635 - 4,635 OTHER CONTRACTUAL SERVICES 927,000 - 927.000 Total: 931,635 959,584 1,891,219 Fund Summary Previous Years FY 2020121 FY 2021122 FY 2022123 FY 2023124 FY 2024/25 Future Total 419 2017 WATER&SEWER BONDS 931,635 959,584 - - - 1,891,219 Total: 931,635 959,584 1,891,219 Page 623 of 1313 741 UTILITIES CITY OF MIAMI BEACH B"E'-A C....." r FY 2021 -2025 Capital Budget and 5-Year Capital Improvement Plan WATER&WASTEWATER MAINS AND REHAB UTILITIES Project Number: 28520 Department: PW ENGINEERING Location: CITYWIDE Description: Rehabilitation of the water and wastewater mainlines. Projected date range: 10101/2019 to 12/31/2025 6 mnun Cost Summary Previous Years FY 2020121 FY 2021122 FY 2022/23 FY 2023/24 FY 2024/25 Future Total CONSTRUCTION 16,600,000 9,370,855 - 14,214,469 15,441,872 15,268,653 - 70,895,849 DESIGN AND ENGINEERING 350,000 - - - - - - 350,000 OIG FUNDING 50,000 46,854 - - - - - 96,854 Total: 17,000,000 9,417,709 - 14,214,469 15,441.872 15,268,653 - 71,342,703 J Fund Summary Previous Years FY 2020121 FY 2021/22 FY 2022123 FY 2023124 FY 2024125 Future Total 418 W&S CAP PROJ FNDED BY OPER FDS 140,889 - - - - - 140,889 419 2017 WATER&SEWER BONDS 17,000.000 9.276,820 - - - - 26,276,820 FWS FUTURE WATER&SEWER - - 14,214,469 15,441,872 15,268,653 - 44,924,994 Total: 17,000,000 9,417,709 14,214,469 15,441,872 15,268,653 - 71,342,703 Page 624 of 1313 744 UTILITIES CITY OF MIAMI BEACH C FY 2021 -2025 Capital Budget and 5-Year Capital Improvement Plan WATER METER REPLACEMENT PROGRAM UTILITIES Project Number: 60319 Department: PW ADMINISTRATION Location: CITYWIDE Description: This project is to address the need for a water meter replacement program currently not established.These funds will start a multiple year project to replace meters th.at have not been replaced on a regular schedule. Projected date range: 1 010 1/201 8 to 09/30/2022 E 4 Cost Summary Previous Years FY 2020121 FY 2021122 FY 2022123 FY 2023124 FY 2024125 Future Total EQUIPMENT 9,058,893 - - - - - 9,058,893 OIG FUNDING 56,000 24,876 80,876 OTHER CONTRACTUAL SERVICES 1,990,000 4,975,124 - 6,965,124 Total: 11,104,893 5,000,000 - - - 16,104,893 y IcI4Eti,t��tRtuY i "I II d r 4 Fund Summary Previous Years FY 2020/21 FY 2021122 FY 2022/23 FY 2023/24 FY 2024125 Future Total 418 W&S CAP PROJ FNDED BY OPER FDS 9,104,893 - - - - - 9,104,893 419 2017 WATER&SEWER BONDS 2,000,000 5,000,000 - 7,000,000 Total: 11,104,893 5,000,000 - 16,104,893 Page 625 of 1313 745 UTILITIES CITY OF MIAMI BEACH }D �`- FY 2021 -2025 Capital Budget and 5-Year Capital Improvement Plan , •r WATER PUMP STATIONS IMPROVEMENTS UTILITIES Project Number: 28120 Department: PW ENGINEERING Location: CITYWIDE Description: Requesting additional funds to replace the leaking old cast iron pipes at water pump stations.This project would replace all existing old oversized cast iron pipes and fittings at the pump station to standard ductile iron pipes and fittings.By-pass pumps will needed to be installed to keep the station and both 4-million-gallons water storage tanks in operation while repairs are being made. Projected date range: 10/01/2019 to 09/30/2024 N Cost Summary Previous Years FY 2020/21 FY 2021122 FY 2022/23 FY 2023124 FY 2024/25 Future Total CONSTRUCTION 795,000 (22,861) 4,710,396 - - - 5,482,535 CONTRACTED SERVICES REPAIR - 4,595,000 - - 4,595,000 DESIGN AND ENGINEERING 200,000 - - - 200,000 OIG FUNDING 5,000 22,861 - - - - - 27,861 Total: 1,000,000 4,595,000 4,710,396 - - - 10,305,396 Fund Summary Previous Years FY 2020121 FY 2021/22 FY 2022/23 FY 2023124 FY 2024/25 Future Total 418 W&S CAP PROJ FNDED BY OPER FDS 1,000,000 - - - - - - 1,000.000 419 2017 WATER&SEWER BONDS - 4,595,000 - - - - 4,595,000 FWS FUTURE WATER&SEWER - - 4,710,396 - - - 4,710,396 Total: 1,000,000 4,595,000 4,710,396 - - - - 10,305,396 Page 626 of 1313 746 %f=fi Appendices January 2022 RISING FINAL ABOVE APPENDIX D Resolution 2020-31211 Passed and Adopted on March 18, 2020 City of Miami Beach Public Works Department Infrastructure Division Emergency Response Plan We are committed to providing excellent public service and safely to all who live, work and play in our vibrant, tropical, historic community. Page 627 of 1313 RESOLUTION NO. 2020-31211 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ACCEPTING THE RECOMMENDATION OF THE FINANCE AND ECONOMIC RESILIENCY COMMITTEE AT ITS FEBRUARY 28, 2020 MEETING,TO ACCEPT THE FIVE-YEAR CRITICAL NEEDS CAPITAL PLAN FOR THE CITY'S WATER AND WASTEWATER SYSTEM, TO APPROVE THE USE OF THE $24 MILLION AVAILABLE FROM BOND PROCEEDS, AND TO COMMENCE A RATE STUDY OF THE WATER AND WASTEWATER UTILITY TO DETERMINE FINANCIAL CAPACITY FOR THE WATER AND WASTEWATER WORK ASSOCIATED WITH THE JACOBS ENGINEERING NEIGHBORHOOD PRIORITIZATION AND THE REMAINING $61 MILLION DOLLARS OF CRITICAL NEEDS. WHEREAS, public infrastructure serves as the backbone of a well-run municipality,and typically, as infrastructure ages and the needs of a growing city expand, existing infrastructure requires rehabilitation and upgrades; and WHEREAS, the failure to reinvest in utility infrastructure has resulted in neighboring communities having had numerous water main breaks and sewerage spills resulting in one community being fined $1.8 million by state regulators; and WHEREAS, recognizing the increasing need to strategically invest in the water and sewer utility, the Public Works Department tasked Hazen and Sawyer with developing a Water and Sewer Master Plan that prioritizes projects over 25 years; and WHEREAS, at its October 23, 2019 Sustainability and Resiliency Committee ("SRC') meeting, Public Works staff presented to the Committee a progress update on the Water and Sewer Master Plan (the"Master Plan"); and WHEREAS, the staff stated it has reviewed the Master Plan and was ready for the Finance and Economic Resiliency Committee ("FERC") (formerly the Finance and Citywide Projects Committee)to review and to further discuss a financing plan; and WHEREAS, the SRC Committee made a motion to refer the Master Plan to the FERC to identify funding sources; and WHEREAS, the Master Plan reflects the utility's needs as defined by the Water and Sewer Master Plans and internal renewal and replacement plans; and WHEREAS, the plan accounts for an investment of $122.3 million, of which approximately $37.5 million is'already funded; and Page 628 of 1313 WHEREAS, an additional $24 million of unencumbered water and sewer bond funds have been identified— if these funds were appropriated toward the proposed five- year critical needs capital plan, there would remain a funding gap of approximately $61 million; and WHEREAS, when planning the sequencing of projects, staff often takes into account work within the projects' proximity and, when beneficial, projects are grouped into larger neighborhood jobs; and WHEREAS, approximately $37 million of the overall $122.3 million plan have been identified as independent projects— independent projects generally include aerial pipe crossings, subaqueous pipelines, or other work that lies outside neighborhood boundaries; and WHEREAS, thus, some projects within the Water and Sewer Critical Needs Five Year Capital Plan may fall within the boundaries of possible neighborhood jobs; and WHEREAS, however, due to the criticality of these projects, the Administration may proceed with their design and/or construction prior to the start of a neighborhood job; and WHEREAS, it is important to note that this plan only includes the critical needs defined in the Master Plan and does not encompass general water and sewer work, which may occur as part of the City's neighborhood jobs; and WHEREAS, the cost and scope of water and sewer work within neighborhood jobs will be quantified upon completion of the Jacobs Engineering Neighborhood Priority List; and WHEREAS, in order to facilitate further discussion, the Water and Sewer Five Year Priority Lists were presented to the FERC at its February 28, 2020 meeting, and within the lists, a column identified which projects are independent from larger neighborhood jobs; and WHEREAS, the estimates presented were for planning and budgeting purposes; the actual costs will be determined when the projects are fully designed and bid; and WHEREAS, FERC made a motion to proceed to the City Commission to seek acceptance of the five-year critical needs capital plan for the City's water and wastewater system, and approval of the $24 million available from bond proceeds subject to a future appropriation; and WHEREAS, additionally, FERC recommended commencing a rate study of the water and wastewater utility to determine financial capacity for the water and wastewater Page 629 of 1313 work associated with the Jacobs Engineering neighborhood prioritization and the remaining $61 million dollars of critical needs. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby accept the recommendation of the Finance and Economic Resiliency Committee at its February 28, 2020 meeting, to accept the five-year critical needs capital plan for the.City's water and wastewater system, to approve the use of the $24 million available from bond proceeds, and to commence a rate study of the water and wastewater utility to determine financial capacity for the water and wastewater work associated with the Jacobs Engineering Neighborhood Prioritization and the remaining $61 million dollars of critical needs. PASSED and ADOPTED this 11 day of R#rCIt, , 2020. DAN GELBER, MAYOR ATTW/V11 oL� RA AEL E. GRANA60, CITY CLERK INCORPOR TEDi APPROVED AS TO FORM & LANGUAGE &FOR EXECUTION City Attu Date Page 630 of 1313 Resolutions-C7 V MIAMiBEACH COMMISSION MEMORANDUM TO: Honorable Mayor and Members of the City Commission FROM: Jimmy L. Morales, City Manager DATE: March 18,2020 SUBJECT:A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ACCEPTING THE RECOMMENDATION OF THE FINANCE AND ECONOMIC RESILIENCY COMMITTEE AT ITS FEBRUARY 28, 2020 MEETING, TO ACCEPT THE FIVE-YEAR CRITICAL NEEDS CAPITAL PLAN FOR THE CITY'S WATER AND WASTEWATER SYSTEM, APPROVE THE USE OF THE $24 MILLION AVAILABLE FROM BOND PROCEEDS;AND TO COMMENCE A RATE STUDY OF THE WATER AND WASTEWATER UTILITY TO DETERMINE FI NANCIAL CAPACITY FOR THE WATER AND WASTEWATER WORK ASSOCIATED WITH THE JACOBS ENGINEERING NEIGHBORHOOD PRIORITIZATION AND THE REMAINING$61 MILLION DOLLARS OF CRITICAL NEEDS. RECOMMENDATION The Administration recommends acceptance of the five-year critical needs capital plan for the City's water and wastewater system, and approval of the $24 Million available from bond proceeds, subject to a future appropriation. Additionally, the Administration recommends commencing a rate study of the water and wastewater utility to determine financial capacity for the water and wastewater work associated with the Jacobs Engineering neighborhood prioritization and the remaining $61 Million dollars of critical needs. BACKGROUND/HISTORY Public infrastructure serves as the backbone of a well-run municipality. Typically, as infrastructure ages and the needs of a growing city wpand, e)dsting infrastructure requires rehabilitation and upgrades. Such is the case with the City's water and sewer utility. Recognizing the increasing need to strategically invest in the water and sewer utility, the Public Works Department tasked Hazen and Sawyer with developing a Water and Sewer Master Plan that prioritizes projects over 25 years. At its October 23, 2019 Sustainability and Resiliency Committee (SRC) meeting, Public Works staff provided the members of the Committee a progress update on the Water and Sewer Master Plan. The Administration stated it has reviewed the plan and was ready for the Finance and Economic Resiliency Committee (FERC) (formerly the Finance and Citywide Projects Page 545 of 1097 Page 631 of 1313 Committee)for review and to further discuss a financing plan. The SRC Committee made a motion to refer the Water and Sewer System Master Plan to the FERC to identify funding sources. ANALYSIS The proposed five year critical needs capital plan for the City's water and wastewater system is summarized below. Capital Proled PROJECT TITLE FM Est.Cost RU Est.Cost M2 Est.Cost ffB Est.Cost M4 RL Cost Tote! Ater&Wastewater Mains and Rehab $ 16.093,000 $ 10,277,955•$ 14,214,469 .$ 15,441,872 $ 25,269,653 $ 71,295,848 Water Pump Station Improvements $ 5,592,900 $ 4,710,396 I IS 10,303,296 Wastewater Stations Rehab. 5 11,103,400'$ 5,209,019 I I $ 16,312,419 Valve Assessment&Replacement Progam Ij i$ 900,000' $ 927,000 $ 954,810• I$ 2,781,810 Sewer Pump Station Odor Control Is 850,600 i $ 850,600 tADA&PLC(W&Sonly) $$ 1,625,250 1,625,250 Wastewater Manhole Rehab. $ 1,500,000 $ 1,545,000, $ 1,591,350!$ 1,639,091 $ 1,688,263 5 7,963,704 Water Meter Replacement $ 11,104,893 IS 11,104,893 TOTAL $ 122,231,819 This plan reflects the utility's needs as defined by the Water and Sewer Master Plans and internal renewal and replacement plans. As seen above, the plan accounts for an investment of$122.3 Million, of which approxmately $37.5 Million is funded. An additional $24 Million of unencumbered water and sewer bond funds have been identified. If these funds were appropriated toward the proposed five year critical needs capital plan, then: would remain a funding gap of approximately$61 Million. When planning the sequencing of projects, staff often takes into account work within the projects' proximity and, when beneficial, projects are grouped into larger neighborhood jobs. Approximately$37 Million of the overall $122.3 Million plan have been identified as independent projects. Independent projects generally include aerial pipe crossings, subaqueous pipelines, or other work that lies outside neighborhood boundaries. Thus, some projects within the Water and Sewer Critical Needs Five Year Capital Plan may fail within the boundaries of possible neighborhood jobs. However, due to the criticality of these projects, the Administration may proceed with their design and/or construction prior to the start of a neighborhood job. It is important to note that this plan only includes the critical needs defined in the Water and Sewer Master Plans and does not encompass general water and sewer work, which may occur as'part of the City's neighborhood jobs. The cost and scope of water and sewer worts within neighborhood jobs will be quantified upon completion of the Jacobs Engineering Neighborhood Priority List. Page 546 of 1097 Page 632 of 1313 In order to facilitate further discussion, the Water and Sewer Five Year Priority Lists are attached herein. Within the lists, a column identifies which projects are independent from larger neighborhood jobs. The estimates presented herein are for planning and budgeting purposes;the actual costs will be determined when the projects are fully designed and bid. Regionally there is a growing need to reinvest in utility infrastructure. The failure to reinvest in utility infrastructure has resulted in neighboring communities having had numerous water main breaks and sewerage spills resulting in one community being fined $1.8 million by state regulators. These projects are needed to reduce the risk of similar events happening in the City of Miami Beach. At its February 28, 2020 meeting, the Finance and Economic Resiliency Committee made a motion to proceed to the full Commission to seek acceptance-of the five-year critical needs capital plan for the Citys water and wastewater system,and approval of the $24 Million available from bond proceeds subject to a future appropriation.Additionally,the Committee recommended commencing a rate study of the water and wastewater utility to determine financial capacity for the water and wastewater work associated with the Jacobs Engineering neighborhood prioritization and the remaining$61 Million dollars of critical needs. CONCLUSION The Administration recommends accepting the recommendation and adoption of the Resolution. Applicable Area Citywide Is this a"Residents NO Does this item utilize G.O. to Know"item,pursuant to Bond Funds? City Code Section 2-14? Yes No Legislative Tracking Public Works ATTACHMENTS: Description o Water and Sewer System priority lists Page 547 of 1097 Page 633 of 1313 Water System Critical Needs Priority list independent Pro ect Name Pmjm toci tten 1110BIn Date Total W-2BoosterStation Piping Rehabilitation ✓ 72h Street and Dickens Ave 2020 S L 000.00• Replacement of WMaerial crossings Venetian Isles ✓ Venetian Isles 2020 S 4,420=110 Rehabilitation of WMaerial aossin on MacArthur MacArthur Bridge 211120 2,27L478.001 Water Main PoF CoF Priori 1 T 30-inch FM Alton Rd and 41stSt.,others.TBD 21120 S 25,127,797.70' 10th Street between Lenox Ave and Washington Fire Flow project 1 _ Ave. 2020 S S20 000.00 Fire Flow Project3 Meridian Ave and 13th Street 2D20 S 2W.OD0.00 Fire Flow Project 5 locations v 2020 150.00000 Meter Replacement ✓ City Wide 2020 $L2,104,893.40 Valve Assessment and Replacement Pro G Wide 20M $ I.08L815.00 WaterSCADA ✓_ CitvWide 2020 S 406,312.50 Fire How Proect 7 Locations va . 2021 $ 72,100 00 Fire Flow Pro'ect 13 Michigan and 7th Ave 2021 S 484,100.00 Fire Flow Project 16 Alton Rd.and Mlchlon Ave 2021 S 63a600.00 Fire Flow Project 17 ✓ Terminal island 2021 S 175,100.00 1 Construction of New 0iosterStation North Beach 2021 Is S,592900,00 Aerial Crosstn Water Main Replacement ✓ 41st Street between Meridian Ave and ChaseAve 2022 S 72,100.001 Aerial Crossl2g Water Main Replacement 42st Street between Pine Tree Or and Indian Creek 2021 $ 204,0MOO Aeri at CrosslnzWater Main Replacement ✓ 71st Street and Bonita Dr. 2021 S 10400.00' Water Main an MacArthur Causeway ✓ MacArthur Causeway 2022 S 4,10 GEM Belle Isle Booster Station Rehabilitation ✓ Belle Isle 2022 S 4,710,396.OD Fire Flaw Pro'et2 2 West Ave and Flamingo 2022 $ 187.00 Fire Flow Project 4 Euclid and 14th PI 2022 S 169 MOO+ Fire Flow Prood 15 Euclid and 14th Street 2022 $ 307,66L00 Fire Flow Project 6 CallinsPark 2023 $ 9$345.43 Fire Flow Pro ect8 Meridian and 15th Street 2023 $ 131,127.24 Fire Flow Proect 10 2Mh Street and Collins Ave 2023 $ 87 418.16 Fire Flow Proiect 11 11111th Street and Collins Ave 2023 $ 109,27170 Fire Flow Project 12 Col tins and 17th street 2024 S 57,418.16 Fire Flow Project 9 N.Bay Rd between 41st and Ord 5t 2024 S 82L L43 Fire Flaw Project 14 North Beach,Varies 0024 S ffi5,386.70' Total Water ti6 85741 Sewer System Critical deeds Priority list Independent Project Norm proed Locatirm Begin Date Total GravatyMalnReplacement-FriorityI Basin 19(La Gorceisland),others TBD 2020 $ 4,916,259.76 Gravitv Mains iA Reduction-Priority 1(a) 04(Hibiscus),OS(Palm),02(Star).others THO 2020 $ 2.25r4357.D0 Venetian Way aerial crossing replacement in kind ✓ Venetian Causeway 2020 $ 77U 000.00 Valve assessment and replacement City Wide 2020 $ I®9995.00 ,Pump Station No.2force main replacement ✓ Star Island to loth Street and West Ave. 2020 S 2,SSO DOO.00 Force Mains PoF/CoF Priority 1 Terminal to Star Island,Normandx isles,other TBO 2020 S 9.913.027.17 :Pump Station No.is(wee main replacement La Gorce Island 2020 $ •S50,DOO.00 .odor Control System ✓ Varies 2020 S OW.15 0.00 SewerSCADA ✓ City Wlde 2020 S L21$937.50 Manhole Inspection and rehabilitation Cltv Wide 2020 $ 7,963,703.72 Pump Station 6,7 and$rerouting Belle Isle 2021 $ 1,194,800.00 Aerial crossing Pine Tree Drive S1stStreet to 47th St. ✓ Pine Tree Drive 2021 $ 700 400.OD Pump Station No.28Rehabilitation 28th Streatand Pine Tree 2021 11,103,400.00 PumpStationNo.iRehabllitation 11thStreet 2022 S 3,140,264.00 Pump Station No.30,well lining,and electrical upgrades ✓ Terminal Island 2022 $ 2,068 7SS•00 Pump Station No.4fame main replacement Between Palm and Hibiscus island 2022 S 477 4%.W Pump Stations No.5force main replacement Palm Island 2022 S 4L3,75L00 Pump Station No.l4force main replacement Sunset Island 3 2022 S 9t11,765.00 Pump Station No.23 force main replacement 75th Street and Dickens Ave 2022 S 53,045.00 Pump Station No.27 force main replacement Collins Ave and 52nd Street 2022 S 53,049.00 lGravity Mains t 1 Reduction-Priority 1(b) Basin 23,other TSO 2023 S 1643,452.32 !Total sewer S SL39-UL47 Page 548 of 1097 Page 634 of 1313