Loading...
Resolution 2022-32060RESOLUTION NO, 2022-32060 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO. 1 TO THE CONTRACT BETWEEN THE CITY AND FLORIDA CONSTRUCTION & ENGINEERING, INC, RELATING TO THE REHABILITATION OF THE CITY'S AFFORDABLE HOUSING PROJECT KNOWN AS THE MADELEINE VILLAGE APARTMENTS, LOCATED AT 7861-7871 CRESPI BOULEVARD; SAID CHANGE ORDER INCLUDING THE FOLLOWING ADDITIONAL SCOPE OF WORK: 1) PERFORMING MOVING SERVICES FOR TENANTS WHO ARE DISPLACED AS A RESULT OF THE CONSTRUCTION WORK, IN THE AMOUNT OF $14,400; 2) SUPPLYING AND INSTALLING NEW FLOORING IN ALL SIXTEEN UNITS, IN THE AMOUNT OF $69,776; 3) REMOVING AND RELOCATING TWO (2) EXISTING JUNCTION BOXES AND THEIR RESPECTIVE CONDUITS, IN THE AMOUNT OF $8,807.50; 4) PERFORMING ELECTRICAL MODIFICATIONS OF THE KITCHEN AREA IN ALL UNITS, IN THE AMOUNT OF $11,992.50; 5) SUPPLYING AND INSTALLING TWO (2) ADA HANDRAILS IN REAR APARTMENTS, IN THE AMOUNT OF $595.00; 6) SUPPLYING AND INSTALLING CONCRETE PAVERS ON THE SOUTHERN WALKWAY TO PROVIDE AN ADDITIONAL ESCAPE ROUTE, AS REQUESTED BY THE CITY'S FIRE DEPARTMENT, IN THE AMOUNT OF $3,654.72; 7) INSTALLING FIRE PADS ON EXISTING BOXES WITHIN FIRE WALLS IN ADJACENT UNITS TO MEET THE FIRE CODE, IN THE AMOUNT OF $852.80; 8) SUPPLYING AND INSTALLING CONFLEX SHERLASTIC ELASTOMERIC COATING TO THE OUTDOOR FACADE OF ALL FOUR BUILDINGS, IN THE AMOUNT OF $14,895.38; 9) REMOVING AND REPLACING THE BATHTUB, TILES, FAUCETS AND DRAIN FOR ONE OF THE UNITS, IN THE AMOUNT OF $5,398.67; AND 10) EXTENDING THE CONTRACT TIME BY 60 DAYS, FOR A TOTAL CHANGE ORDER AMOUNT OF $130,372.57, THAT INCREASES THE CONTRACT AMOUNT FROM $609,687.00 TO $740,059.57. WHEREAS, on February 12, 2020, the Mayor and City Commission approved the award of Invitation to Bid ("ITB") No. 2020-069-JC for the Madeleine Village Apartments Rehabilitation Project (the "Project"), in the amount of $609,687.00; and WHEREAS, the Madeleine Village Apartments is an affordable housing project, located at 7861-7871 Crespi Boulevard, comprised of four buildings and a total of sixteen units ("the Property"); and WHEREAS, on March 27, 2020, the City and Contractor executed a construction contract (the "Contract") with respect to the Project, which scope of work included the rehabilitation of the interior and exterior facade of the Property; and WHEREAS, the Project is funded, in part, by the Department of Housing and Urban Development (HUD) and Federal Emergency Management Agency (FEMA); and WHEREAS, the City's Fire Department has inspected the Property and required several modifications in order for the Project to receive a Temporary Certificate of Occupancy (TCO); and WHEREAS, the following additional work and/or services are required in order for the Project to achieve substantial completion, for a total cost of $130,372.57: 1) performing moving services for tenants who are displaced as a result of the construction work, in the amount of $14,400; 2) supplying and installing new flooring in all sixteen units, in the amount of $69,776.00; 3) removing and relocating two (2) existing junction boxes and their respective conduits, in the amount of $8,807.50; 4) performing electrical modifications of the kitchen area in all units, in the amount of $11,992.50; 5) supplying and installing two (2) ADA handrails in rear apartments, in the amount of $595.00; 6) supplying and installing concrete pavers on the. southern walkway to provide an additional escape route, as requested by the City's Fire Department, in the amount of $3,654.72; 7) installing fire pads on existing boxes within fire walls in adjacent units to meet the fire code, in the amount of $852.80; 8) supplying and installing conflex sherlastic elastomeric coating to the outdoor fagade of all four buildings, in the amount of $14,895.38; and 9) removing and replacing the bathtub, tiles, faucets and drain for Unit No. 8, located at 7871 Crespi Boulevard, in the amount of $5,398.67; and WHEREAS, the proposed Change Order will increase the Contract time by 60 days and increase the Contract amount from $609,687.00 to $740,059.57; and WHEREAS, the City has the funds available to cover this additional expense without exceeding the funding budget; and WHEREAS, the Project has expenditure deadlines in connection to the HUD awarded funds that must. be met by April 2, 2022; and WHEREAS, the City. Manager recommends approving Change Order No. 1 to the Contract, incorporated herein by, reference and attached to the City Commission Resolution accompanying this Resolution. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby approve and authorize the City Manager to execute Change Order No. 1 to the Contract between the City and Florida Construction & Engineering, Inc., relating to the rehabilitation of the City's affordablehousing project known as the Madeleine Village Apartments, located at .7861-7871 Crespi Boulevard; said change order including the following additional Scope of Work: 1) performing moving services for tenants who are displaced as a result of the construction work, in the amount of $14,400.00; 2) supplying and installing new flooring in all sixteen units, in the amount of $69,776.00; 3) removing and relocating two (2) existing junction boxes and their respective conduits, in the amount of $8,807:50; 4) performing electrical modifications of the kitchen areain all units, in the amount of $11,992.50; 5) supplying and installing two (2) ADA handrails in rear apartments, in the amount of $595.00; 6) supplying and installing concrete pavers on the southern walkway to provide an additional escape route, as requested by the City's Fire Department, in the amount of $3,654.72; 7) installing fire pads on existing boxes within fire walls in adjacent units to meet the fire code, in the amount of $852.80; 8) supplying and installing conflex sherlastic elastomeric coating to the outdoor facade of all four buildings, in the amount of $14,895.38; 9) removing and replacing the bathtub, tiles, faucets and drain for one of the units, in the amount of $5,398.67; and 10) extending the contract time by 60 days, for a total Change Order amount of $130,372.57, that increases the Contract amount from $609,687.00 to $740,059.57. PASSED and. ADOPTED THIS I ATTEST: MAR 1 4 2022. RAFAEL E. GRANADO, CITY CLERK ....... . ..�'j'• P!fORPtiOkbTED:' DAY OF IW14'1 , 2022. DAN GELBER, MAYOR APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION 3-1— -2-L City Attorney �1 �— Date Resolutions - C7 C MIAMIBEACH COMMISSION MEMORANDUM TO: Honorable Mayor and Members of the City Commission FROM: Alina T. Hudak, City Manager DATE: March 9, 2022 SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO. 1 TO THE CONTRACT BETWEEN THE CITYAND FLORIDA CONSTRUCTION & ENGINEERING, INC., RELATING TO THE REHABILITATION OF THE CITY'S AFFORDABLE HOUSING 'PROJECT KNOWN AS THE MADELEINE VILLAGE APARTMENTS, LOCATED AT 7861-7871 CRESPI BOULEVARD; SAID CHANGE ORDER INCLUDING THE FOLLOWING ADDITIONAL 'SCOPE OF WORK: 1) PERFORMING MOVING SERVICES FOR TENANTS WHO ARE DISPLACED AS A RESULT OF THE CONSTRUCTION WORK, IN THE AMOUNT OF $14,400; 2) SUPPLYING AND INSTALLING NEW FLOORING IN ALL SIXTEEN UNITS, IN THE AMOUNT OF $69,776; 3) REMOVING AND RELOCATING TWO (2) EXISTING JUNCTION BOXES AND THEIR RESPECTIVE CONDUITS, IN THE AMOUNT OF $8,807.50; 4) PERFORMING ELECTRICAL MODIFICATIONS OF THE KITCHEN AREA IN ALL UNITS, IN THE AMOUNT OF $11,992.50; 5) SUPPLYING AND INSTALLING TWO (2) ADA HANDRAILS IN REAR APARTMENTS, IN THE AMOUNT OF $595.00; 6) SUPPLYING AND INSTALLING CONCRETE PAVERS ON THE SOUTHERN WALKWAY TO PROVIDE AN ADDITIONAL ESCAPE ROUTE, AS REQUESTED BY THE CITY'S FIRE DEPARTMENT, IN THE AMOUNT OF $3,654:72; 7) INSTALLING FIRE PADS ON EXISTING BOXES WITHIN FIRE WALLS IN ADJACENT UNITS TO MEET THE FIRE CODE, IN THE AMOUNT OF $852.80; 8) SUPPLYING AND INSTALLING CONFLEX SHERLASTIC ELASTOMERIC COATING TO THE OUTDOOR FACADE OF ALL FOUR BUILDINGS, IN THE AMOUNT OF $14,895.38; 9) REMOVING AND REPLACING THE BATHTUB, TILES, FAUCETS AND DRAIN FOR ONE OF THE UNITS, IN THE AMOUNT OF $5,398.67; AND 10) EXTENDING THE CONTRACT TIME BY 60 DAYS, FOR A TOTAL CHANGE ORDER AMOUNT OF $130,372.57, THAT INCREASES THE CONTRACT AMOUNT FROM $609,687.00 TO $740,059.57. RECOMMENDATION The Administration recommends adopting the Resolution. Page 91 of 874 BACKGROUND/HISTORY The Madeleine Village Apartments is a City -owned, 16-unit multi -family garden -style apartment building located at 7861-7871 Crespi Boulevard. The property consists of four (4), one-story apartment buildings constructed in 1952, and is situated on a 0.26-acre residential multifamily zoned site situated within the North Shore Historic District and fronting the restricted, deep water access Tatum Waterway. The Madeleine Village Apartments is a contributing property to the North Shore Historic District. The Madeleine Village Apartments is operated as an affordable housing property for low to moderate- income residents and it is managed by the Office of Housing, & Community Services. The property location is impacted by climate change and sea rise and required development and engineering because of the elevations. The Madeleine Seawall Replacement is underway -as a separate project. The seawall will be raised to current City requirements and along with drainage improvements and waterproofing protection to the building and replacement of the doors with impact resistant doors, will improve the resiliency of the building. The roof has been replaced in 2019 with a membrane roofing system with enhanced insulation R-30 to improve energy usage and enhance resiliency. Madeleine Village Building Rehabilitation Project On February 12, 2020, the Mayor and City Commission approved Florida Construction & Engineering, Inc (FC&E) as the lowest, most responsive bidder in ITB 2020-069-JC. On March 27, 2020, the contract by and between the City of Miami Beach and Florida Construction and Engineering was executed for the Madeleine Village Apartments Rehabilitation in the amount of $609,687.00, including a,10% contingency. The project is funded by HOME Investment Partnership Program, Community Development Block Grant (CDBG), and Federal Emergency Management Agency (FEMA). The HOME funds, awarded to this project have a deadline of April 2, 2022. The Administration will request an extension from HUD to complete the project close-out and to ensure compliance with federal guidelines. On March 16t', 2021, the permit was issued by the CMB Building Department. The delay was caused by a DERM requirement that an unrelated permit (the seawall replacement) be issued prior to the issuance of the Rehab permit. Permit number BC1911342 was issued 11 days after issuance of the seawall replacement permit BC1911307. On May4t', 2021, the second Notice to proceed was issued to FC&E. The NTP2 was held pending acceptable insurance placement by FC&E.. ANALYSIS The Madeleine Village Apartments rehabilitation project represents a comprehensive building renovation, focused on preserving this City -owned, low- to moderate- income housing property. The scope of work has been carefully designed to be performed while the buildings are occupied, causing the minimum possible disruption to the tenants while ensuring compliance with federal guidelines and property standards. The rehabilitation will help maintain and further enhance the historic architectural integrity of the property. The Madeleine Village Apartments consists of four (4) one-story buildings containing four (4) studio apartments per building. The proposed improvements include: waterproofing the buildings, new site drainage, relocation of two entrance doors to accommodate for the new drainage, raising the sidewalks to eliminate water ponding, removal of the un-permitted laundry structure, replacement of all exterior doors with impact resistant doors, installation of laundry washers and dryers in each unit, waterproofing the historic planters along the sides of the Page 92 of 874 buildings, replacement of lighting fixtures with high efficiency fixtures, and exterior/interior patch and paint. FC&E submitted a proposal and other documentation (Exhibit A) for the following additional scope requested by the City: 1. Relocation of the tenants and all personal belongings to vacant units within the Madeleine Village Apartments then back to their original units upon completion of the interior rehabilitation in the amount of $14,400. The City requested the contractor to add this task to the project scope to save in excess of $30,000.00 compared to the cost of hiring a contractor to relocate the residents off site. 2. Furnish and install slip resistant, waterproof flooring in all units in the amount of $69,776.00. This item was added to the scope to provide greater safety to the residents while improving building resiliency. 3. Specific electrical modifications at units 7861-8 & 7871-8 in the amount of $8,807.50. Included the removal of existing main line junction boxes, hand dig trenches to relocate conduit, installation of new junction boxes above the new doorways, wiring extended between junction boxes and terminations completed waterproof lugs and bushings. Upon the relocation of the entrance doors, the main electrical line junction boxes were discovered to interfere with the new doorway placement and required relocation. 4. Correction of existing unsafe electrical installations in each unit in the amount of $11,992.50. Serious electrical deficiencies were discovered during the installation of the wiring and plumbing connections for the individual laundry appliances. Changes required for the safety of the tenants and to meet current code. 5. The fabrication and installation of ADA handrails at the entranceway of units 7861-8 & 7871-8, in the amount of $595.00. ADA handrails along the wall were added for tenant safety and code requirements. 6. Installation of concrete pavers on the southern walkway as required for life safety, in the amount of $3,654.72. Installation of a concrete paver walkway was required by the City Fire Prevention inspector. 7. Installation of fire barrier pads on existing junction boxes in demising walls in the amount of $852.80. Upon the demolition of drywall as required in the original contract scope, deficiencies discovered included missing fire barriers. 8. Installation of specialized elastomeric coating per FEMA flood proofing requirements in the amount of $14,895.38. A FEMA grant awarded subsequent to the award of this contract was incorporated into this project. As a requirement of the grant, specific flood proofing improvements were added to the scope. 9. Replacing bathtub, tiles, faucets, drain and cement wall board in unit 7871-8, in the amount of $5,398.67. During rehabilitation extensive water damage was discovered in the subject bathroom requiring demolition and removal of bathtub and fixtures and reconstruction of the cement wallboard and tile. 10. An extension to the contract time of 60 days. The added scope impacts the project schedule by an additional 60 days. This change order No. 1 will increase the contract amount by $130,372.50, to be funded by previously appropriated grant funding, revising the total contract amount to $740,059.57, and extending the contract duration by 60 days to substantial completion. The nature of this project is not unlike any other project which includes remodeling, refurbishing and rehabilitation. It is not uncommon to encounter unforeseen conditions which require added scope and effort. Further complicating projects of this nature is the fact that work is ongoing, the residential units are occupied and delays impact more than just the completion date. I n order to mitigate those impacts, city staff has endeavored to balance the project scope and corrective Page 93 of 874 measures of those unforeseen conditions. In order to reduce the impact to the tenants, the project has utilized the previously approved contingency to move the project forward, including some of the scope listed above. This change order shall serve to authorize the contractor to complete the added scope and replenish the project contingency. SUPPORTING SURVEY DATA N/A FINANCIAL INFORMATION N/A Amount(s)/Account(s): The account numbers for the project are listed below: Account Number Original Contract Amount Change Order #1 New Contract Amount CDBG 132-0530-000346-00-404-534-00-00-00-40020 $100,834.18 $ 32,898.69 $133,732.87 135-0530-000346-00-404-534-00-00-00-40020 $ 8,986.76 $ 8,986.76 137-0530-000346-00-404-534-00-00-00-40020 $ 10,468.66 $ 10,468.66 139-0530-000346-00-404-534-00-00-00-40020 $ 39,240.46 $ 39,240.46 HOME 181-0530-000346-23-404-534-00-00-00-40020 $ 41,601.02 $ 11,660.10 $ 53,261.12 184-0530-000676-00-410-535-00-00-00-62618 $ 220,213.98 $ 54,759.62 $ 274,973.60 186-0530-000312-23-404-534-00-00-00-62618 $198,810.60 $ - $198,810.60 FEMA 303-0530-069357-23-410-535-00-00-00-53621 $ - $ 20,585.50 $ 20,585.50 Total Contract 1 $ 609,687.00 $130,372.57 $ 740,059.57 CONCLUSION The Administration recommends that the Mayor and City Commission adopt the resolution approving and authorizing the City Manager to execute this change order with FC&E, for the Madeleine Village Building Renovations and Site Improvements in the amount of $130,372.50 and extending the contract duration by 60 days to substantial completion. Applicable Area Not Applicable Is this a "Residents Right to Know" item, pursuant to City Code Section 2-14? No Strategic Connection Non -Applicable Legislative Tracking Does this item utilize G.O. Bond Funds? No Page 94 of 874 Housing and Community Services ATTACHMENTS: Description ❑ FCE Proposal 1-3 ❑ FCE Proposal 4 ❑ FCE Proposal 5 ❑ FCE Proposal 6 ❑ FCE Proposal 7 ❑ FCE Proposal 8 ❑ FCE Proposal 9 ❑ Attachment ❑ Resolution Page 95 of 874 DocuSign Envelope ID: 747EC57B-ADD3-43CC-A9CE-DF705ECFAFAF PROJECT NAME: Madeleine Village Apartments Rehabilitation A/E CONSULTANT: KCI Technologies CONTRACTOR: Florida Construction & Engineering RPRlCEI: Continaency Draw NO. i DATE CREATED: 08.09.2021 DUE DATE: 08.14.2021 Reason for Contingency Draw: This contingency request will reimburse the contractor for the cost of repairing cut and spliced wires discovered inside the kitchen walls along the length of the kitchen counters. Contract documents and architectural plans anticipated that the electrical wiring had been completed safely and to code. The unsafe and unworkmanlike way the electrical wiring was installed remained hidden until the walls were cut to install new plumbing lines for the washer/dryer units. These wires provide service to the countertop receptacles. New lines will be run to the outlets from the panel to correct the condition and bring the wiring to current code requirements. Additional Scope: Please submit a proposal itemizing labor/material cost and time proposal for changes in the contract time for the following proposed work: 1. Removal of damaged Romex wire in the kitchen at each unit, to be replaced with new 12/2 Romex, 2. Install one new GFCI receptable and one new load -controlled receptacle along the countertop, 3. Install one AFCI 20 amp. breaker at each unit for modified circuit, 4. Removal of the 2 existing junction boxes and relocation, 5. Hand dig trench and relocate the conduit, 6. Install 2 new junction boxes above doorway, 7. Extend wiring between junction boxes, complete wire terminations with Polaris lugs and grounding bushings, data box to remain as is. Contractor's Proposal: Please submit the costs for this work which will be included as part of the Contingency, Attach file if mores ace is needed. Please refer to the attached. Amount: $20,800.00 Contingency Summary: Total Project Contingency: $55,426.00 Previous Contingency Draws: $00.00 This Contingency Draw: $20,800.00 Contingency Balance prior to this change: $55,426.00 Contingency Balance after this change: $34,626.00 This is not an authorization to proceed with work involving additional costs and/or time. Notification must be given in accordance with the contract documents if any response causes any changes to the contract. Page 1 of 2 Page 96 of 874 DocuSign Envelope ID: 747EC57B-ADD3-43CC-A9CE-DF705ECFAFAF Contractor: Recommended by Engineer of Record: Recommended by Architect of Record: Florida Construction & Engineering KCI Technologies The Tamara Peacock Company DocuSigned by: Johnny a SI ned by: Robert g igned by: Cristin ea /�,y xbv� bgwb Signed iw Pt,dl(, & Signed Signed] Date: PM PDT Date:871" 0BfAFq0-211 :03 AM EDT Date: 1:15 PM EDT Approved by CDBG Projects Coordinator: Approved by HOME/SHIP Projects Coordinator Approved Controller Housing: DocuSigned by: Cristina abrera DocuSigned by: Marcela Rubio DocuSigned by: Alice W ter Si ned: Si ned: 0Signed Date: PM EDT Date: PM EDT Date: PM EDT Approved by Sr. Capital Project Coordinator: Approved by Interim Director Housing: DocuSigned by: DocuSigned by: Pablo Alba Ta re Signed Signed: a� Date: PM ED I Date: M1ff)FMZ2L;vf-14-::48 PM EDT 0 Page 2 of 2 Page 97 of 874 DocuSign Envelope ID: 747EC57B-ADD3-43CC-A9CE-DF705ECFAFAF lt;�C FC =� -%E FLORIDA CONSTNUCHON & ENGINEERING Change Order Request No. 4 TO: City of Miami Beach PROJECT: ITB 2020-069-3C Madeleine Village Building Renovations & Site Attn: Pablo Gomez / PM Improvements 7/28/21 4 Conduit Junction Box Relocation - ASAS proposal includes: removal of the 2 existing junction boxes and ation, Hand dig trench and relocate the conduit, Install 2 new ;ion boxes above doorway, extend wiring between junction boxes, Mete wire terminations with polaris lugs and grounding bushings, box to remain as is for it does not enter into conflict with the new TOTAL OF PROPOSED CHANGE REQUEST (ADD) TOTAL OF PROPOSED CHANGE TIME REQUEST (ADD) Florida Construction & Engineering Inc. Johnny Dec President Contractor Name Title 1 1 Item 1 $ 8,807.50 1 $ 8,807.50 Subtotal 1 $ 8,807.50 -- TOTAL $ 8,807.50 PG $8,807.50 48 Calendar Day 7/2812021 Signature Date Having received the above, I hereby certify that the best of my knowledge and belief the same reflects adequate values and that the Contractor is entitled to payment as noted above. City of Coral Gables Pablo Gomez Project Manager Owner Name Tide Signature Date Page 98 of 874 DocuSign Envelope ID: 747EC57B-ADD3-43CC-A9CE-DF705ECFAFAF C FICi .: E FLORIDA CONSTRUCTION 6 ENGINEERING Change Order Request No. 4 TO: City of Miami Beach PROJECT: ITB 2020-069-JC Madeleine Village Building Renovations & Site Attn: Pablo Gomez / PM Improvements D. 7/28/211 5 Countertop Wiring and Receptacle Repairs - RFI #18 This proposal includes: the removal of damaged Romex wire in the kitchen at every unit, replace with new 12/2 Romex, Intall one new GFCI receptable and one new load controlled receptacle along countertop, Install one AFCI 20 amp breaker at each unit for modified circuit, Existing remaining kitchen receptacles to remain as is, with no 1 modifications. Existig receptacles to remain as is. 1 Item TOTAL OF PROPOSED CHANGE REQUEST (ADD) TOTAL OF PROPOSED CHANGE TIME REQUEST (ADD) Florida Construction & Engineering Inc. Johnny Dec President Contractor Name Title Subtotal 1 $ 11,992.50 PG TAL $ 11,992.50 $11,992.50 48 Calendar Day 7/28P2021 Signature Date Having received the above, I hereby certify that the best of my knowledge and belief the same reflects adequate values and that the Contractor is entitled to payment as noted above. City of Coral Gables Pablo Gomez Project Manager _ Owner Name Title Signature Date Page 99 of 874 DocuSign Envelope ID: 747EC57B-ADD3-43CC-A9CE-DF705ECFAFAF Madeleine Rehab 6/23/2021 The sanitary line runs to the front of the building and disappears behind the planter. This line will be removed and capped off within the planter. The distance between the electrical boxes is 9,3„ Please note the water line along the bottom must continue left to feed the hose bib. Please note electrical enters the building over the right side of the window. Page 100 of 874 DocuSign Envelope ID: 747EC57B-ADD3-43CC-A9CE-DF705ECFAFAF Madeleine Rehab 6/23/2021 The electrical outlets, water lines & vents are abandoned after the removal of the washer dryer. Note the tankless water heater and disconnect are also abandoned. 7861 Unit 8 Page 101 of 874 DocuSign Envelope ID: 747EC57B-ADD3-43CC-A9CE-DF705ECFAFAF Florida Construction & Engineering, Inc. - FC301 Almeria Ave. Suite 360 Coral Gables, Florida 33134 FLORIDA CONSTRUCTION A ENGINE EKING P: (305) 883-7601 RFI #18: Kitchen Wires Status Open To Pablo Gomez (City of Miami Beach) From Robert Zuccaro (KCI Technologies Inc.) Cristin Peacock (The Tamara Peacock Comapny) Date Initiated Jul 26, 2021 Due Date Location Project Stage Cost Impact Schedule Impact Spec Section Cost Code Drawing Number Reference Linked Drawings Received From Jordan De Armas (All Star Electric) Project: Madeleine Village Miami Beach 7861-7871 Crespi Boulevard Miami Beach, Florida 33141 Ricardo Esclusa (Florida Construction & Engineering, Inc.) Jul 29, 2021 Course of Construction Copies To Johnny Dao (Florida Construction & Engineering, Inc.), Ricardo Esclusa (Florida Construction & Engineering, Inc.), Isabel Fernandez (Florida Construction & Engineering, Inc.), Sebastian Fraiese (Florida Construction & Engineering, Inc.), Jonathan Geiger (KCI Technologies Inc.), Pablo Gomez (City of Miami Beach), Melanie Melanie (The Tamara Peacock Comapny) Activity Question Question from Ricardo Esclusa Florida Construction & Engineering, Inc. on Monday, Jul 26, 2021 at 02:43 PM EDT Upon site visit on Friday, we discovered some cut and spliced wires inside the kitchen walls. It appears to service the counter top receptacles. This would need to be corrected before any inspections can be performed. This is an unforeseen condition that was discovered after the plumbers opened the wall to run their lines. It seems to be the case at every unit. Please advise accordingly. Attachments Madeline Village Kitchen Wires 2.jpg, Madeline Village Kitchen Wires 1.jpg Awaiting an Official Response The spliced wires in the kitchen is a code violation and will need to be corrected to be code compliant. New lines will need to be run to the outlets from the panel to correct the condition. rn1ALo6- 7/29/2021 —v Florida Construction & Engineering, Inc. PacpgMt A874 Printed On: Jul 28, 2021 04:23 PM EDT n _ f•efn 'L WON! wo _ - 6 ifi-•; ia - ... �-�#` �* t .h�e� _`_4—K ._�., �•FlwS�r`A" •. ��=..yam =:ti. i�., =- _'S_. 1 ✓x3. 1� t � K� �� _:._ 1 _ i� ^' $ Li�� � - fir+( si ..�j. C.F �`-�' -_� „- QNorth Elevation - EXISTING UTILITIES at at ODP. I :i -- South Elevation- EXISTING UTILITIES �i 7861 EAST BUILDING —I T.i.Ti I 1871 EAST BUILDING North Elevation - RELOCATED UTILITIES BUILDING 1871. ALL ABANDONED EQUIPMENT TO BE REMOVED. NEW DOM TO BE INSTALLED PER THE CONSTRUCTION DOCUMENTS. WATERUNE TOM BURIED IN THE GROUNOAND ELECTRICAL BOX MOVED TO THE LEFT OF THE OPENING TO NOT INTERFERE WITH THE DOONINEW LANDING. PATCH AND REPAIR THE FACADE TO HUTCH EXISTING BRICK TEXTURE. PAINT FACADE PER CONSTRUCTION DOCUMENTS. _.J Teel EAST BUILDING South Elevatlon - RELOCATED UTILITIES OUROINO T881' RELOCATE THEELECTRICALBOXABOVENEWAWNING.RELOCATEUUCONDENSATE UNE TO THE RIGHT OF THENEW LANDING. PATCH AND REPAIR THE FACADE TO MATCH EXISTING BRCK TEXTURE. NEW DOOR TO BE INSTALLED PER CONSTRUCTION DOCUMENTS. PLANT FACADE PER CONSTRUCTION DOCUMENTS. z A ffi A81 7 O 0 0 C LO 7 m ED 0 -0 0 Cd _ I 5 I 1 III. t,' ICI 7 n �. a I�i '1�• II TBTI EAST BUILDING .�•� w w..r.n.. .....•..,.e........�. North ElevBton-EXISTINGUTILITIES -Ji 1-31 a...v ... L� I- � I I I' III• 1� -. I i I � I I Teel EAST BUILDING South Elevation -EXISTING UTILITIES o.,....._. w_ 7171 EAST BUILDING North Elevation -RELOCATED UTILITIES a..a ..... - - "---- - IRIILgNG lBI1� ALL ABANDONED EDUIPRENT TO BE REMOVED. NEW DOOR 70 BE INSTALLED PER THE CONSTRUCTION DOCUMENTS. WATER LINE TO BE BURIED IN THE GROUND AND ELECTRCAI BOX MOVED TO THE LEFT OF THE OPENING TO NOT INTERFERE WITH THE DOORINEW LANDING. PATCH AND REPAIR THE FACADE 10 MATCH EXISTING BRIGXTEXTURE PAINT FACADE PER CONSTRUCTION DOCUMENTS. T I of ,. 1'' , � .`l I-..L_. r.. .Lr.,_,.--._I ..T._-N-. i -r-•5 r 'r•--T;- -...i _ _ � I _ , � 7SS1 EASTBUILDING South Elevation - RELOCATED UTILITIES BVILDINO T881: RELOCATE THE ELECTRICAL BOA ABOVE NEW AWNING. RELOCATE CIU CON DENSATE LINE TO THE RIGHT OF THE NEW LANDING. PATCH AND REPAIR THE FACADE TO MATCH EJUSn NO BRICK TEXTURE. NEW DOOR TO BE INSTALLED PER CONSTRUCTION DOCUMENTS. PAINT FACADE PER CONSTRUCTION OCCUMENTS. ni" nat � FLORIDA CONSTRUCTION B ENGINEERING . Change Order Request No. 11 TO: City of Miami Beach PR03ECF: ITB 2020-069-3C Madeleine Village Building Renovations & Site Attn: Pablo Gomez / PM Improvements Date C.0 112/20/211 11 AC Unit Relocation proposal includes: the supply and installation of two (2) ADA (rails. Each handrail will be installed in the back apartments (3-D & . As per the detail #8 of Revision 10 of the drawing A11.00 1 I ' Item 1 $ 595.00 1 $ 595.00 Subtotal 1 $ 595.00 ITAL $ 595.00 TOTAL OF PROPOSED CHANGE REQUEST (ADD) TOTAL OF PROPOSED CHANGE TIME REQUEST (ADD) Florida Construction & Engineering Inc. Johnny Dao President 12/202021 Contractor Name Title Signature Date $595.00 1 Calendar Days Having received the above, I hereby certify that the best of my knowledge and belief the same reflects adequate values and that the Contractor is entitled to payment as noted above. City of Coral Gables Pablo Gomez Project Manager Owner Name Title Signature Date Page 107 of 874 FC`----E FCORICA CONSTRUCTION & ENGINEERING Change Order Request No. 12 TO: City of Miami Beach PR03ECr: rrB 2020-069-7C Madeleine Village Building Renovations & Site Attn: Pablo Gomez / PM Improvements 1/10/22 12 Paver Walkway Southern Corridor This proposal includes: the supply and installation of concrete pavers (24"x24" dimension) on the southern walkway as requested by the Fire Chief for the TCO as an extra escape route. 1 1 Item TOTAL OF PROPOSED CHANGE REQUEST (ADD) TOTAL OF PROPOSED CHANGE TIME REQUEST (ADD) Florida Construction & Engineering Inc. Johnny Dao President Subtotal 1 $ 3,654.72 TOTAL $ 3,654.72 $3,654.72 1 Calendar Days f /f 0/2022 Contractor Name Title Signature Date Having received the above, I hereby certify that the best of my knowledge and belief the same reflects adequate values and that the Contractor is entitled to payment as noted above. City of Coral Gables Pablo Gomez Project Manager Owner Name Title Signature Date Page 108 of 874 .�-C FLORIDAOkSC10k -- ENGINES Change Order Request No. 7 TO: City of Miami Beach PROJECT: ITB 2020-069-3C Madeleine Village Building Renovations & Site Attn: Pablo Gomez / PM Improvements Date CO # 110/20/217 Take out toilets and reinstall i proposal includes: the installation of fire pads on existing boxes ed within fire walls in adjacent units in order to meet the code. 1 I Item I $ 852.80 I $ 852.80 Subtotal I $ 852.80 TOTAL $ 852.80 TOTAL OF PROPOSED CHANGE REQUEST (ADD) TOTAL OF PROPOSED CHANGE TIME REQUEST (ADD) Florida Construction & Engineering Inc. Johnny Dao President 10/202021 Contractor Name Trda Signature Date $852.80 0 Calendar Day Having received the above, I hereby certify that the best of my knowledge and belief the same reflects adequate values and that the Contractor is entitled to payment as noted above. City of Coral Gables Pablo Gomez Project Manager _ Owner Name Title Signature Date Page 109 of 874 FC"-"E FLORIDA CONSUL' iIDN 6 ENGINEERING Change Order Request No. 8 TO: City of Miami Beach PROJECT: ITB 2020-069-JC Madeleine Village Building Renovations & Site Attn: Pablo Gomez / PM Improvements Date C.0 110/20/211 8 lWaterproofing the outter fa de of the 4 building complexes for floodproofing 1 This proposal includes: the supply and installation of Conflex Sherlastic Elastomeric Coating to the outdoor fafade of all 4 buildings, from the bottom of the building to a height of 8'6" measured from the bottom. This is paintlike waterproofing agent that offers basic protection. 1 1 Item Subtotal $ 14,895.38 TOTAL $ 14,895.39 TOTAL OF PROPOSED CHANGE REQUEST (ADD) $14,895.38 TOTAL OF PROPOSED CHANGE TIME REQUEST (ADD) 6 Calendar Day Florida Construction & Engineering Inc. Johnny Dao President 10/20/2021 Contractor` Name Title Signature Date Having received the above, I hereby certify that the best of my knowledge and belief the same reflects adequate values and that the Contractor is entitled to payment as noted above City of Coral Gables Pablo Gomez Project Manager _ Owner Name Title Signature Date Page 110 of 874 FLORIDA (ONSIRUCTION 3 ENGINEERING Change Order Request No. 9 TO: City of Miami Beach PR03ECT: ITB 2020-069-3C Madeleine Village Building Renovations & Site Attn: Pablo Gomez / PM Improvements Date C.0 # 111/2/219 Bathtub and Tiling Apartment 3-D his proposal includes: demolition and removal of bathtub, tiles, fa nd drain for the bathroom in unit 3-D. Labor and materials for the istallation of a new tub, faucets, drain, tiles and durock. 1 1 Item Subtotal 1 $ 5,398.67 TOTAL $ 5,398.67 TOTAL OF PROPOSED CHANGE REQUEST (ADD) $5,398.67 TOTAL OF PROPOSED CHANGE TIME REQUEST (ADD) 4 Calendar Days Florida Construction & Engineering Inc. Johnny Dao President 11/9/2021 Contractor Name Title Signature Date Having received the above, I hereby certify that the best of my knowledge and belief the same reflects adequate values and that the Contractor is entitled to payment as noted above. City of Coral Gables Pablo Gomez Project Manager _ Owner Name Title Signature Date Page 111 of 874 CHANGE ORDER NO. 1 Madeleine Village Apartments PROJECT NAME: Rehabilitation A/E CONSULTANT: KCI / Peacock CONTRACTOR: Florida Construction & Engineering. CONTRACT # ITB-2020-069-JC DATE: 04/15/2021 You are herebv directed to make the following changes to the Contract Documents: DESCRIPTION OF This Change Order provides for the following: CHANGE: 1. Relocation of the tenants and all personal belongings to vacant units within the Madeleine Village Apartments then back to their original units upon completion of the interior rehabilitation in the amount of $14,400. 2. Furnish and install slip resistant, waterproof flooring in all units in the amount of $69,776.00. 3. Specific electrical modifications at units 7861-8 & 7871-8 include the removal of existing main line junction boxes, hand dig trenches to relocate conduit, installation of new junction boxes above the new doorways, wiring extended between junction boxes and terminations completed eith waterproof lugs and bushings in the amount of $8,807.50. 4. Correction of existing unsafe electrical installations in each unit in the amount of $11,992.50. 5. The fabrication and installation of ADA handrails at the entranceway of units 7861-8 & 7871-8, in the amount of $595.00. 6. Installation of concrete pavers on the southern walkway as required for life safety, in the amount of $3,654.72. 7. Installation of fire barrier pads on existing junction boxes in demising walls in the amount of $852.80. B. Installation of specialized elastomeric coating per FEMA flood proofing requirements in the amount of $14, 895.38. 9. Replacing bathtub, tiles, faucets, drain and cement wall board in unit 7871-8, in the amount of $5,398.67. 10. 10. An extension to the contract time of 60 days. The added scope impacts the project schedule by an additional 60 days. REASON FOR The contractor has the skill and equipment required to provide the above services needed to complete the project. CHANGE: The contractor offered a price for the relocation of the tenants far below the quotes obtained from approved moving contractors. The remaining items were either unforeseen or determined to be necessary during the construction process. The FEMA grant awarded after commencement of this project also required additional scope. CLASSIFICATION: Owner Directed IF OTHER: NIA ATTACHMENTS: Request for Change Order #1, Contingency Draw #1, Change order request #11(ADA Handrails), Change Order Request #12 ( Pavers), Change Order Request #7 (Fire barrier pads), Change Order Request #8 (Flood Prnnfinnl r.hanna f)rrtar rarnrast dfA [Rnthrnnm rahahilitntinn) CHANGE IN CONTRACT SUM CHANGE IN CONTRACT TIME Original Contract Sum: $609,687.00 Original Contract Time to Substantial Completion: 180 DAYS Net change by previously Net change from previous Change DAYS authorized Change Orders: Orders: Contract Sum prior to this $609,687.00 Contract Time to Substantial Completion prior to this Change 180 DAYS Change Order: Order is: Contract Sum will be Contract Time will be increased/decreased by this $130,372.50 increased/decreased by the +60' DAYS Change Order in the amount following calendar days: of: New Contract Sum including this $740,059.57 New Contract Time to Substantial 240 DAYS Change Order is: Completion is: ADJUSTMENTS TO TIME FOR PERFORMANCE:' Due to delays caused by the Covid-19 pandemic, certain materials and manufacturing times for the storefront entrance doors maybe delayed. In connection with the change(s) noted in this document, CONTRACTOR'S TIME FOR PERFORMANCE may be modified, subject to written approval, to account for said delays. This Change Order is an amendment to the Agreement between the Contractor and City. The amount and time change designated herein are the maximum agreed to by both the City and Contractor for this Change Order. Contractor attests that the Contract adjustment provided herein is reasonable, and constitutes compensation in full for all costs, claims, markup, and expenses, direct or indirect, attributable to this or any other prior Change Orders, including but not limited to compensation in full for any delays, acceleration, or loss of efficiency encountered by Contractor in the performance of the Work through the date of this Change Order, and for the performance of this and any prior Change Orders by or before the date of Substantial Completion. In consideration of the compensation and time, if any, in this Change Order, the Contractor hereby releases the City from all Claims, demands, or causes of action arising out of the transactions, events and occurrences giving rise to this Change Order. This written Change Order is the entire agreement between the City and Contractor with respect to this Change Order. No other agreements or modifications shall apply to this contract amendment unless expressly provided herein. 112 of 874 FX!`FPT AC FYPRFRST V MADIFIFn HFRFTN THE TFRMS AM) (YINnmrwN OF THE (YINTRArT nnrTIMFNTC RFMAIN I ThJr9ANrFn Approved by Sr. Capital Project Coordinator: Approved by C. D. B. G. Projects Coordinator: Approved by HOME Projects Coordinator: Pablo Gomez Cristina Cabrera Marcela Rubio Approved by Engineer of Record: Approved by Architect of Record: Approved by HCS Comptroller: KCI Technologies The Tamara Peacock Company Alice Waters Approved by Contractor: Approved by Housing & Community Services Director Approved by City Manager: Florida Construction & Engineering Alba Tame Alina Hudak 113 of 874