Loading...
Contract with L3Harris Technologies • MIAMIBE `� z . r �j C H CoCo�ttt actJDoc etot ge{�r>rr con ra [z- ,-•Q .. t 2017-006-AK Public Safety Radio System—Amendment 9 ._ ', .,,5 pis w �,',� � �- .� a' `'��'°'.-. 4�E'�`g"test7 iD�B:+'d�ia: � �`�"'�4`�X�rU°n`iv�^:'�fa.'.r.'",�+�.�. L3Harris Technologies Fire ._l'..:I,'�i13.1d liJJ,l..'�D�" J:.=b L .;r*;✓�sr;, + +; ,Gc,4A�_y}_ y ,...lizeiC, Virgilio Fernandez NA X Type 1—Contract,amendment,change order or task order resulting from a procurement-issued competitive solicitation. Type 2—Other contract,amendment,change order or task order not resulting from a procurement-issued competitive solicitation. Type 3—Independent Contractor Agreement(ICA) Type 6—Tenant Agreement Type 4—Grant agreements with the City as the recipient Type 7—Inter-governmental agency agreement Type 5—Grant agreements with the City as the grantor Other: Clija 'tt iicA x '�i� l u :7 The attached amendment is amendment 9 to the public safety radio system contract with L3Harris,the awarded contractor. The amendment is necessary for the rollowing reasons:1)to replace the model of the radios in the contract,which is now obsolete,with the newly released model;and 2)to purchase a repeater unit which is necessary for the City's vehicle command unit. The total fiscal impact of the model upgrade and the new repeater is approximately$556,601.However,because the contract currently includes credits which may be used at the City's discretion,the model update for the radios and purchase of the repeater will not increase the total contract amount.As such,the City Attorney's Office has determined that,since the total contract price is not affected,the City Manager has authority to execute the Amendment.Similarly,the City Manager has executed prior amendments that did not affect the total contract price. The amendment has been form approved for the City Manager's signature by the City Attorney's Office. r. - rgrP,L'Cd:..ti,'�1 � i"$'�4 �t-' "sir rit tUi { 0 i `�}-.•4_. ... NA NA NA Grant Funded: Yes X No State Federal Other: . i'' * ° :Cost!: an,n [ o. : ; t s'^ M ,c d eMisaaat 1 The amendment has no impact on the City Commission Yes No approved contract price. 2 Yes No 3 Yes No 4 Yes No 5 Yes No 1.For contracts longer than five years,contact the Procurement Department. 2.Attach any supporting explanation needed. 3. Budget approval indicates approval for current fiscal year only. Future years are subject to City Commission approval of annual adopted operating budget. rf City Commission Approved: X Yes No Resolution No.: CC Agenda Item No.: CC Meeting Date: 2017-30061 R7D 10/18/2017 The City Commission approved a not to exceed contract amount of$10 million.Including the current amendment,the updated contract total is now$9,444,947.00. Legal Form Approved: X Yes No If no,explain below why form approval is not necessary: `Go Odri, rm. ;sets 71L-1 sir` Procurement: Grants: NA Budget: '� Information Technology: NA A Risk Management: NA Fleet&Facilities: NA Human Resources: NA Other: qP4RRIS N TECHNOLOGY TO CONNECT, INFORM AND PROTECT WHEREAS, on October 22, 2019, the parties executed Amendment 4 to the Agreement, modifying the scope of Services of the Agreement to reflect the additional installation of an aluminum gate at the Parking Enforcement site (referenced as one of the additional equipment, upgrades, and features requested by the City during negotiations which were to be included in the Grand Total of $10,000.000.00; more specifically this site is listed on the bottom of Page-12 as the"Microwave link for the additional Console for Traffic/Code," of Appendix A Proposal Tender Form, of Exhibit A— Statement of Work-Price Schedule of the Agreement)to enclose the area where an outdoor microwave cabinet will be located, in the total amount of$24,830.00,reducing the total Agreement credit balance to$744,882.00;and WHEREAS, on December 3, 2019, the parties executed Amendment 5 to the Agreement, modifying the scope of Services of the Agreement to include additional microwave equipment needed at the City Hall site (referenced as "Microwave only Site located at New City Hall" in Item 4, EOCBackup Dispatch (Network Pricing), of Appendix A Proposal Tender Form, of Exhibit A — Statement of Work- Price Schedule of the Agreement), in the total sum of$36,444.60, reducing the total Agreement credit balance to$708,437.40;and WHEREAS, on March 16, 2020, the parties executed Amendment 6 to the Agreement, modifying the scope of Services of the Agreement to include the preparation of electrical drawings to legalize and bring up to code the electrical room,generator and transfer switch at Rebecca Towers, in the total sum of$48,412.00,reducing the total Agreement credit balance to$660,025.40; and WHEREAS, on May 18, 2020, the parties executed Amendment 7 to the Agreement modifying the scope of quantities and models of terminals to be ordered as part of the Agreement; modifying the total Agreement price of$10,000,000.00 by$365,114.00,to a total Agreement price of S9,634,886.00;and,in addition, leaving a total Agreement credit balance of$660,025.40;and WHEREAS,on November 18,2021,the parties executed Amendment 8 to the Agreement to memorialize additional change orders which were required to purchase additional products and services as part of the Agreement and to modify the Total Agreement Price of$9,634,886.00 by $189,939.00, to a total Agreement price of$9444,947.00; and in addition, leaving a total Agreement credit balance of $269,869.11 (the Agreement and Amendments 1-8 of the Agreement shall be collectively referred to herein as the"Agreement");and NOW,THEREFORE, for and in consideration of the mutual promises of the parties to this Amendment and other good and valuable consideration,the receipt of which is hereby acknowledged, the City and Contractor do hereby agree as follows: 1. The above recitals are true and correct and are incorporated as part of this Amendment. 2. Purpose: During the development and installation of the L3Harris Technologies P-25 Radio System, the following change order is required for the completion of the P-25 Radio System in order to achieve Final Completion and Final Acceptance as defined in the Agreement.These additional products,services,and eliminations are listed as follows: Page 2 of 7 ECR-8126A 08/01/2017 f4RRI5" TECHNOLOGY TO CONNECT. INFORM AND PROTECT THIS AMENDMENT 9 CONTAINS CONFIDENTIAL SECURITY SYSTEM PLAN INFORMATION EXEMPT FROM DISCLOSUREPURSUANT TO SECTION 119.071(3),FLORIDA STATUTES AMENDMENT 9 TO SYSTEM PURCHASE AGREEMENT 800 MHz P25 Digital Trunked Simulcast Network THIS AMENDMENT 9 ("Amendment") to the System Purchase Agreement is made and entered into this 2"d day of March,2022("Effective Date"),by and between the City of Miami Beach ("City") and L3Harris Technologies, Inc, a Delaware corporation formerly known as Harris Corporation("Seller"of"Contractor"). RECITALS WHEREAS, on February 26, 2018, the parties entered into a System Purchase Agreement, Contract No. RFP 2017-006-AK-00(the"Agreement" or"Contract"), for a total Agreement price of $10,000,000.00; and WHEREAS,on May 1,2019,the parties executed Amendment 1 to the Agreement,modifying the scope of Services of the Agreement for the Council Towers site(referenced as item 3, Site#1,of Group 1 (Network Pricing), of Appendix A Proposal Tender Form,of Exhibit A—Statement of Work -Price Schedule of the Agreement)to reflect the repair of the existing shelter at the Council Towers site in the amount of$97,564.25, instead of the replacement cost of$289,888.00, resulting in a credit toward the Total Agreement Price in the amount of$192,323.75;and WHEREAS, on June 10, 2019, the parties executed Amendment 2 to the Agreement, modifying the scope of Services of the Agreement for the Parkview Point site(referenced as Item 3, Site#3,of Group 1 (Network Pricing),of Appendix A Proposal Tender Form,of Exhibit A—Statement of Work-Price Schedule of the Agreement)to reflect the repair of the existing shelter at the Parkview Point site in the amount of$105,868.75,instead of the replacement cost of$289,888.00,resulting in a credit in the amount of$184,019.25 toward the Total Agreement Price, for a total Agreement credit balance of$376,343.00;and WHEREAS, on August 05, 2019, the parties executed Amendment 3 to the Agreement, modifying the scope of Services of the Agreement to reflect the additional installation of NICE Inform API for integration with AQUA software for the installation of the logging recorder in the total sum of $3,900.00, reducing the total Agreement credit balance to $372,443.00 (existing credit from Amendment 1 and 2 ($376,343.00)less$3,900.00);and WHEREAS, Amendment 3 also included additional credits for each of the three new generators ($132,423.00 per new generator) that, at the City's request, will no longer be installed at the Council Towers site, Tower 41 site and Parkview Point site due to their current operational conditions, resulting in a credit of $397,269.00 toward the Total Agreement Price, for a total Agreement credit balance of$769,712.00;and Page 1 of 7 ECR-8126A 08/01/2017 914RMS". IECHNOLOGYTO CONNECT, INFORM AND PROTECT a) The City of Miami Beach mobile command vehicle lacks the ability to provide radio communications for Fire and Police personnel during deployments. This radio communications limitation has prevented deployed personnel to effectively communicate with each other during these types of activations. To remediate this limitation a new repeater will be purchased and installed in the City of Miami Beach Mobile Command vehicle. ® The price for the additional listed services in the previous Paragraph (a) is $22,565.11 (see L3Harris Technologies Quote dated June 30, 2020, incorporated herein by reference and attached hereto as Attachment A to this Amendment), and referenced in Group 4,ADDITIONAL EQUIPMENT AND SERVICES, of Appendix A Proposal Tender Form, of Exhibit A—Statement of Work-Price Schedule(page 20),attached hereto,which will be deducted from the available credit balance as of the execution of Amendment 8,in the amount of $269,869.11, reducing the remaining Agreement credit balance to $247,304.00, which will be used by the City as owner's contingency for products and services,as approved by the City,prior to Final Acceptance. b) The City and L3Harris Technologies mutually agree to remove all scope and responsibilities to install a P-25 radio site at the originally agreed upon location of 5600 Collins Ave., formally known as MidBeach within the Agreement and install a P-25 radio site at 5660 Collins Ave. This installation work is complete, and the City of Miami Beach has entered a lease agreement directly with the 5660 Collins Ave. property owners. In addition to the P-25 radio site change from 5600 Collins Ave.to 5660 Collins Ave., as described in the previous paragraph,the City decided to opt out of installing a new generator at 5660 Collins Ave. P-25 radio site as the property owners denied the space required to properly install a new generator. Additionally, the cost of not installing a new generator at the 5660 Collins Avenue (Midbeach) radio site will increase the remaining credit balance to $373,354.00 ($247,304.00+ $126,050.00) which will be used by the City as owner's contingency for products and services,as approved by the City,prior to Final Acceptance. 6 The credit for the services described in the previous Paragraph (b) is $126,050.00, as referenced in Section 6 (Simulcast System Transmit/Receive Site #6: Mid Beach with backup Simulcast DCP, of Appendix A Proposal Tender Form, of Exhibit A - Statement of Work — Price Schedule (Page-9), attached hereto, which will be added to the City's contingencies of $247,304.00,leaving a remaining credit balance in the amount of$373,354.00 which will be used, in full,by the City for products and services listed below in subparagraph(c). c) The City will purchase sixty-five (65) XL-400P Portable Extreme Radios and accessories, in the total sum of $511,290.00, as referenced in Section 2 (Fire Page 3 of 7 ECR-8126A 08/01/2017 qi,tinwarS" TECHNOLOGY TO CONNECT. INFORM ANO PROTECT Department), of Appendix A Proposal Tender Form, of Exhibit A -Statement of Work - Price Schedule (Page-15), which, after applying the remaining Agreement credit balance,in the amount of$373,354.00,left an Agreement balance of$137,936. d) The City received a credit,in the amount of S 140,214,as referenced in Section 2(Fire Department), of Appendix A Proposal Tender Form, of Exhibit A -Statement of Work - Price Schedule (Page-15) for the seventy-nine (79) XL-200P radios initially purchased for the City's Fire Department(referenced in Amendment No. 7) that will be kept by the City,as part of the consideration for purchasing the new XL-400P radios and accessories, referenced in the preceding subsection(c), which, after applying the Agreement balance of$137,936,left an Agreement credit balance of$2,278.00. e) The City purchased sixteen(16)XL-400P station chargers, in the amount of$11,648 and thirty-one(31) XL-400P Premium Fire Speaker Mics, in the amount of$11,098, for a total of$22,746.00, as referenced in Section 2(Fire Department), of Appendix A Proposal Tender Form, of Exhibit A -Statement of Work-Price Schedule(Page-16), which, after applying the Agreement credit balance of $2,278, left a remaining Agreement balance of$20,468.00. f) The City received the following credits toward the original XL-200P radios and accessories, as follows: thirty-one(31) Premium Fire Speaker Mics, in the amount of $12,679; fifteen(15)ballistic nylon cases, in the amount of$1,680.00; and 149 Large Knob kits, in the amount of$6,109, as referenced in Section 2 (Fire Department), of Appendix A Proposal Tender Form,of Exhibit A-Statement of Work-Price Schedule (Page-16), leaving a total Agreement credit of S20,468, and thereby eliminating any Agreement balance due Contractor. 3. Total Agreement Price-The Total Agreement Price, as defined in subsection 33 of Section 2 (DEFINITIONS)and as reflected in Section 6(COMPENSATION)shall remain unchanged: Description.' -.Date Value: Total Agreement Price 02/23/2018 $10,000,000.00 Total Agreement Value Adjustment after Amendment 7 was executed 05/18/2020 ($365,114.00) Updated Sub-Total Agreement Price 05/18/2020 $9,634,886.00 Total Agreement Value Adjustment 06/17/2021 ($189,939.00) after Amendment 8 is executed Updated Total Agreement Price 04/25/2021 $9,444,947.00 4. Schedule A (Statement of Work - Price Schedule) (APPENDIX A PROPOSAL TENDER FORM) is hereby deleted in its entirety and replaced with the attached. 5. Full Force and Effect-The terms and conditions of the Agreement, as amended herein, shall remain in.full force and effect. 6. Execution-This instrument may be executed in one or more counterparts. Documents signed and transmitted electronically shall be deemed original and binding documents. Page 4 of 7 ECR-8126A 08/01/2017 q54RRIS .° TECHNOLOGY TO CONNECT. INFORM AND PROTECT IN WITNESS WHEREOF,City and Seller,through their duly authorized representatives, have executed this Amendment. BUYER CITY OF MIAMI BEACH B . ame:Alina Hudak Title:City Manager Date: 03-0-1—2 Z SELLER/CONTRACTOR L3HARRIS TECHNOLOGIES,INC. By: oil, C.. 0co.---s......s•Rts3 Name:Lori A.Rodriguez Title:Director,Contracts Date: February 15,2022 FORM & LI(NG'JAGE & FCR EXECUTION Page 5 of 7 ECR-8I26A 08/01/2017 � g��� City A:torrrry / Dare TECHNOLOGY TO CONNECT, INFORM AND PROTECT ATTACHMENT A • Page 6 of 7 ECR-8126A 08/01/2017 L 3 H A R R I S L3Haais Technologies,Inc. Public Safety and Professional Communications 221 Jefferson Ridge Parkway Lynchburg,Virginia 24501 Phone:1-800-368-3277 Fax 321-409.4393 Quote Name:Miami Beach PD_Conventional Repeater TP9100 700 MHz_051920.R1 Date: 6/30/2020 Anthony Loperfido Soles FOC: Vasquez,Jose Miami Beach Police Department Senior Specialist Account Manager 1100 Washington Avenue 954 214 5783 Miomi Beach,Florida 33139 Lose.Vasquez/L3Harris.com (305)305.7050 Quote by: M Brannon anthcnylopertiido9miamrbeach0.qov CRMN NA CCC Cased INC-000231218 Item Part Number Description Qty Sale Price Extended Sale Price 10 TB9135K4MP000DA400 RPTR 762-870M 100W AC/12 CONV SIF 1 $ 7,247.56 $ 7,247.56 20 TBASOSO SFE P25 COMMON AIR INTERFACE(CAI) 1 $ 4,773.00 $ 4,773.00 30 TBAS051 SFE KEY-ANALOG LINE(T891) 1 $ 70.30 $ 70.30 40 ID-431-24-67M CONTROL UNIT,24-67 TONE RMT W/DESK MIC 1 $ 1,255.50 $ 1,255.50 50 MWFDP7AM(MISC-MTRL-PO-REF) 769.805 MHz Milled Window Filter Duplexer 1 $ 1,920.00 $ 1,920.00 60 DS7D03F36U-D(MISC-MTRL-PO-REF) 746-805 MHz 3 dB Gain Omni Fiberglass Antenna 1 $ 718.75 $ 718.75 with DIN connector 70 Cooper General(MISC-SERV-PO-REF) Installation 1 $ 2590.00 $ 2,500.00 80 MAYA-NSN6L Service,Hareis Senior Sys Engineering 1 $ 2,400.00 S 2,400.00 90 YASPIC Service,Harris System Engineering 1 5 1,590.00 $ 1,590.00 100 YBSP1M Service,Harris Project Management 1 $ 1,590.00 $ 1,590.00 Trade-In Value for Legacy Harris Mastr V 800 MHz Repeater 1 $ (1,500.00) $ (1,500.00) Lead time is subject to material availability at time of order Sale Price $ 22,565.11 • Terms and Conditions: The terms and conditions of this quote are governed by the System Purchase Agreement between L3Hanis Technologies and Ciry of Miami Beach.Please 1' reference MBP/16231;City of Miami Beach Contract/l RFP 2017-006-AK-00,•Signit d 17342;City of Miami Beach Medley Base Station Formal Storing battery packs is not recommended because the chemicals in the battery degrade over time and this affects the functionality of the battery.Batteries 7. that have been stored for longer than their warranty period(12 months)may become non-functional and will not be covered under L3Harris battery warranty. 3. Quote is valid/or 60 days Purchase Order requirements: Purchase Order issued to L3Harns Technologies PSPC 221 Jefferson Ridge Pathway•Lynchburg,VA 24501 The Purchase Order should include the following references: Quote Name,Contract,and/or MBPe relerence(as noted in rt1 above if applicable),and CRMIt listed on quote,if applicable All orders must contain valid model number,quantity,and price for each tern Frequencies must be supplied with order if applicable Requested Delivery Date,If related to Grant Funding,important to provide Grant name,Agency,deadline and product receipt deadline,when applicable. Shipping will default to Best Way,S day ground,unless otherwise specific.Special shipping/delivery instructions(ex.Delivery lift gate required?)must be noted If applicable.Non Standard packing will be billed to the customer. Bill to and Ship to addresses must be included.If account number is available,please provide,If you have not ordered from Harris(or an authoraed Harris dealer)before,please provide contact Information to enable account setup. Harris DUNStl 101474992,Cage Code.1PMR4;Tax ID 34.0276860. Confidential,Proprietary,S Competition Sensitive • CAI IIUIL M-Old=I lel11 Ul VVUI1..-r I IUC.DUI ICUUIC , uu,ua,• Request for Proposals(RFP)Public Safety Network,2017-006-AK City of Miami Beach, Florida APPENDIX A PROPOSAL TENDER FORM Failure to submit Section 5,Proposal Tender Form,in its entirety and fully executed by the deadline established for the receipt of proposals will result in proposal being deemed non-responsive and being rejected. Bidder affirms that the prices stated on the proposal price form below represents the entire cost of the items in full accordance with the requirements of this RFP, inclusive of its terms, conditions, specifications and other requirements stated herein, and that no claim will be made on account of any increase in wage scales, material prices, delivery delays, taxes, insurance,cost indexes or any other unless a cost escalation provision is allowed herein and has been exercised by the City Manager in advance.The Bid Price Form(Section 5)shall be completed mechanically or, if manually, in ink. Proposal Tender Forms(Section 5) completed in pencil shall be deemed non-responsive. All corrections on the Proposal Tender Form (Section 5) shall be initialed. GROUP 1. NETWORK PRICING 1.Simulcast System Control Point#1:(Primary Core at Police Headquarters) 1.A Equipment Description-RF CORE Qty Listed Unit Unit Cost Extended Cost Cost System Controller 1 $ 1,203,165 $ 902,374 $ 902,374 Audio Gateway included in System Controller Price Simulcast Sync. Eq. 1 $ 5,534 $ 4,151 $ 4,151 WAN/LAN Equipment 1 $ 36,539 $ 27,404 $ 27,404 Receiver Voter/Selector included in System Controller Price CP#1 ISSI Gateway Equipment included in System Controller Price ISSI Gateway Microwave 1 $ 104,024 $ 104,024 $ 104,024 System/Alarm Manager Computers 1 $ 9,031 $ 6,773 $ 6,773 Spare Parts-Core 1 Lot $ 100,277 $ 75,208 $ 75,208 Microwave(Loop + Hot Standby) Protected Microwave System 1 $ 108,933 $ 108,933 $ 108,933 Microwave Antenna System included in Microwave System Price M/W Installation included in Microwave System Price Site Civils Standby Battery Plant System Reusing Existing Equip $ Emergency Generator System Reusing Existing Equip $ Electrical Work and Grounding 1 Lot $ 32,188 $ 32,188 $ 32,188 CommSHOP Asset Mgmt System 1 Lot $ 111,882 $ 111,882 $ 111,882 Sub-Total Equipment $ 1,372,937 1.6 Engineering and Project Management Cost Qty Listed Unit Unit Cost Extended Cost Cost Site Engineering/Permits/Drawings 1 $ 100,495 $ 100,495 $ 100,495 Project Management 1 $ 78,575 $ 78,575 $ 78,575 Sub-Tota $ 179,070 1.0 Equipment Installation Labor Cost Qty Listed Unit Unit Cost Extended Cost Cost Equipment Installation Lot $ 87,396 $ 87,396 $ 87,396 Sub-Total Equipment Installation Labor, $ 87,396 1.D Annual Maintenance Cost Qty Total Maintenance cost Maintenance cost "Annual Maintenance Cost 3 years Included Sub-Total Annual Maintenance Cost $ - Grand Total for Group 1(Item 1.A through 1.D) $ 1,639,403 trollrfraS- y Section 1 -Price Schedule Page 1 LAI IIL/IL Pl-JLfLG111G1 IL UI 'IYVI A-r I IVG UL,I IGUUIG JQIIUOI V LVLL , Request for Proposals(RFP)Public Safety Network,2017-006-AK • City of Miami Beach,Florida 2.Simulcast System Optional Control Point#2:(Secondary Core at EOC) 2.A Equipment Description-RF CORE Qty Listed Unk , Unit Cost ' Extended Cost Cost Network Controller 1�; $ 206,968, $ 155,226 $ 155,226 Audio Gateway . included in System Controller Price Simulcast Sync. Eq. 1 $ 5,534' $ 4,151 $ 4,151 ' WAN/LAN Equipment 1 $ 36,539 $ 27,405 $ 27,405 Receiver Voter/Selector included in System Controller Price CP#1 ISSI Gateway Equipment included in System Controller Price System/Alarm Manager Computers 1 $ 9,031 ; $ 6,773; $ 6,773 Microwave (Loop + Hot Standby) - - Protected Microwave System 1 $ 108,933' $ 108,933 $ 108,933 'Microwave Antenna System :�' included in Microwave System Price I M/W Installation included in Microwave System Price 'Site Civils - Standby Battery Plant System '-' Reusing Existing Equip $ Emergency Generator System -. Reusing Existing Equip $ Electrical Work and Grounding - 1 Lot $ 32,188, $ 32,188' $ .. 32,188 Sub-Total Equipmen•, $ 334,67MIN 2.B Engineering and Project Management Cost l Qty Listed Unit Unit Cost Extended Cost , Cost Site Engineering/Permits/Drawings 1 $ 100,495 $ 100,495 $ 100,495 i Project Management 0` $ 78,575 $ 78,575; $ 78,575 Sub-Tots. $ 179,070 2.0 Equipment Installation Labor Cost Qty Listed Unit Unit Cost Extended Cost Cost , Equipment Installation Lot $ 49,9'48 $ 49,948: $ 49,948 Sub-Total Equipment Installation Lobo $ 49,948 • 2.D Annual Maintenance Cost r Qty Total Maintenance Maintenance cost cost Annual Maintenance Cost 3 years ; Included Sub-Total Annual Maintenance Cost` $ - Grand Total for Group 1(Item 2.A through 2.D) $ 563,644 1t/tirS` Section 1 -Price Schedule Page 2 ' LAI(lull I1-JIOICI I ICI II UI V VUI n-f 111,0..J1.11GUUIG JO/,u0,Y GVG• Request for Proposals(RFP)Public Safety Network,2017-006-AK City of Miami Beach,Florida 3.Simulcast System Transmit/Receive Site#3:Council Towers with Main Simulcast DCP 3.A Equipment Descri Description-RF Site Equip Number Listed Unit Unit Cost Extended Cost p q p Required Cost Transmitters • 10 $ 32,127 $ 24,095 $ 240,950 -software P25 Ph 2 Lic. 10 $ 9,500 $ 7,125 $ 71,250 Transmitters Antenna Systems 2 $ 12,924 $ 11,632 $ 23,264 Combiner Package(s) 2 $ 12,125 $ 10,913 $ 21,826 Receiver Antenna 1 $ 7,771 $ 6,994 $ 6,994 Tower-top Preamp 1 $ 1,990 $ 1,990 $ 1,990 Multicoupler 1 $ 2,300 $ 2,300 $ 2,300 Receivers included in Transmitters Price LAN/WAN Equipment 1 $ 95,830 $ 71,873 $ 71,873 Distributed Control Point (DCP) -Main 1 $ 100,000 $ 75,000 $ 75,000 Interop Equipment 800 MHz Interop Links (Qty 6) 1 Lot $ 40,843 $ 30,632 $ 30,632 VHF Interop Links (Qty 3) 1 Lot $ 19,882 $ 14,912 $ 14,912 UHF Interop Links (Qty 3) 1 Lot $ 19,763' $ 14,822 $ 14.822 Smartnet/P25 Interop Links (Qty 10) 1 Lot $ 55,828 $ 55,828 $ 55,828 Interop Gateway 2 $ 71,386 $ 53,540 $ 107,080 Microwave(Loop+ Hot Standby) Protected Microwave System 1 $ 108,933 $ 108,933 $ 108,933 Microwave Antenna System included in Microwave System Price M/W Installation included in Microwave System Price Site Civils Standby Generator System 1 $ 132,423 $ 132,423 $ 132,423 Battery/Charger System 1 $ 42,455 $ 42,455 $ 42,455 Site-Civils Modifications Elect work 1 $ 41,250 $ 41,250 $ 41,250 Equipment Shelterw/Elevated Platform 1 $ 289,888 $ 289,888 $ 289,888 Tower-Structural Analysis Only 1 $ 5,938 $ 5,938 $ 5,938 Sub-Total Equipment $ 1,359,608 City's Contingency(credit)for not installing a new Equipment Shelter w/Elevated Platform(Amendment-1) $289,888;and a new Standby Generator System(Amendment-3)$132,423=$422,311 contingency credits $ Repair of existing shelter and platform cost(Amendment-1)$97,584.25*paid from contingency credits,and 97,564.25* not added to the Sub-Total amount,leaving balance of contingency credits of$324,746.75 3.8 Engineering and Project Management Cost Number ListedUnit e Required Cost Unit Cost Extended Cost Site Engineering/Permits/Drawings 1 $ 100,495 $ 100,495 $ 100,495 Project Management 1 $ 78,575 $ 78,575 $ 78,575 Sub-Total $ 179,070 Site Engineering/Permits/Drawings and Project Management cost reduction(Amendment-8) $ (44,667) Updated Sub-Total $ 134,403 3.0 Equipment Installation Labor Cost Number Listed Unit Unit Cost Extended Cost Required Cost Equipment Installation-RF & Ant. Lot $ 115,330 $ 115,330 $ 115,330 Sub-Total Equipment Installation Labor $ 115,330 I' c- - Section 1 -Price Schedule Page 3 LAI11U11 n-IJLOLGI I ICI IL UI V V Vl I'-I 11UG JI.I IGUUIG JOIIUOI y LULL • Request for Proposals(RFP)Public Safety Network,2017-006-AK City of Miami Beach,Florida 3.D Annual Maintenance Cost Qty Total Maintenance Maintenance cost cost Annual Maintenance Cost 3 years Included Sub-Total Annual Maintenance Cost $ - $--- 654,006 Updated Grand Total for Group 1 (Item 3.A through 3.D) $ 1,609,341 [THE REMAINDER OF THIS PAGE IS INTENTIONALLY LEFT BLANK] • • 1F� 5` •1 nroLo,,,ncc.a-' Section 1 -Price Schedule Page 4 ' LAIIILI\n-Jl0LC1!ICI IL VI VVVI tI.-I I Il•V 0t,UGV WG JO/IUO,Y LOLL Request for Proposals(RFP)Public Safety Network,2017-006-AK City of Miami Beach,Florida 4.Simulcast System Transmit/Receive Site#4:Tower 41 with backup Simulcast DCP 4.A Equipment Descri Description•RF Site Equip Number Listed Unit Unit Cost Extended Cost p q p Required Cost Transmitters 10 $ 32,127 $ 24,095 $ 240,950 -software P25 Ph 2 Lic. 10 $ 9,500 $ 7,125 $ 71,250 Transmitters Antenna Systems 2 $ 12,924 $ 11,632 $ 23,264 Combiner Package(s) 2 $ 12,125 $ 10,913 $ 21,826 Receiver Antenna I $ 7,771 $ 6,994 $ 6,994 Tower-top Preamp 1 $ 1,990 $ 1,990 $ 1,990 Multicoupler 1 $ 2.300 $ 2,300 $ 2,300 Receivers included in Transmitters Price LAN/WAN Equipment 1 $ 95,830 $ 71,873 $ 71,873 Distributed Control Point (DCP) - 1 Included Backup Interop Equipment 800 MHz Interop Links included on Council Tower price page VHF Interop Links included on Council Tower price page UHF Interop Links included on Council Tower price page Smartnet/P25 Interop Links included on Council Tower price page Microwave (Loop+ Hot Standby) Protected Microwave System 1 $ 108,9331 $ 108,933 $ 108,933 Microwave Antenna System included in Microwave System Price M/W Installation included in Microwave System Price Site Civils Standby Generator System 1 $ 132,423 $ 132,423 $ 132,423 Battery/Charger System 1 $ 42,455 $ 42,455 $ 42,455 Site-Civils Modifications Elect/Ground 1 $ 40,625 $ 40,625 $ 40,625 Equipment Shelter Reusing Existing Equip Tower-Structural Analysis Only 1 $ 5,938 $ 5,938 $ 5,938 Sub-Total Equipment $ 770,821 $132,423 City's Contingency(credit)for not installing a new Standby Generator System(Amendment-3) $ 4.B Engineering and Project Management Cost Number Listed Unit p Required Unit Cost Extended Cost Cost Site Engineering/Permits/Drawings 1 $ 100,495 $ 100,495 $ 100,495 Project Management 1 $ 78,575 $ 78,575 $ 78,575 Sub-Total $ 179,070 Site Engineering/Permits/Drawings and Project Management cost reduction(Amendment-8) $ (44,667) Updated Sub-Total $ 134,403 4.0 Equipment Installation Labor Cost Number Listed Unit Unit Cost Extended Cost Required Cost Equipment Installation - RF & Ant. Lot $ 119,670 $ 1 19,670 $ 119,670 Sub-Total Equipment Installation Labor $ 119,670 4.D Annual Maintenance Cost Qty Total Maintenance Maintenance cost cost Annual Maintenance Cost 3 years Included Sub-Total Annual Maintenance Cost $ - TiSection 1 -Price Schedule / �O�i' . Page 5 t-AI IIVII 11-JtOtCIIIGt It UI YVUI r\-I I IUC Jul IODUIt' JO/IUOI y LULL • Request for Proposals(RFP)Public Safety Network,2017-006-AK City of Miami Beach,Florida $ 1,069,561 Updated Grand Total for Group 9(Item 4.A through 4D) $ 1,024,894 [THE REMAINDER OF THIS PAGE IS INTENTIONALLY LEFT BLANK] • iyARMSe 4l+WIV:• JfJ'IVY Section 1 -Price Schedule ..Dorn alln.�nc•rr� Page 6 • L.AI IIVIL r'-JLOLGII!GI IL VI V V VI IL-I'I IVG,..I IGVUIG JOIIUCVI y G VG • Request for Proposals(RFP)Public Safety Network,2017-006-AK City of Miami Beach,Florida 5.Simulcast System Transmit/Receive Site#5:Parkview Point with backup Simulcast DCP 5.A Equipment Description-RF Site Equip Number Listed Unit Unit Cost Extended Cost Required Cost Transmitters 10 $ 32,127 $ 24,095 $ 240,950 -software P25 Ph 2 Lic. 10 $ 9,500 $ 7,125 $ 71,250 • Transmitters Antenna Systems 2 $ 12,924 $ 11,632 $ 23,264 Combiner Package(s) 2 $ 12,125 $ 10,913 $ 21,826 Receiver Antenna 1 $ 7,771 '$ 6,994 $ 6,994 Tower-top Preamp 1 $ 1,990 $ 1,990 $ 1,990 ' Multicoupler 1 $ 2,300 $ 2,300 $ 2,300 Receivers included in Transmitters Price LAN/WAN Equipment 1 $ 76,330 $ 57,248 $ 57,248 Distributed Control Point (DCP) 1 Included Backup Interop Equipment 800 MHz Interop Links included on Council Tower price page VHF Interop Links included on Council Tower price page f UHF Interop Links included on Council Tower price page I Smartnet/P25 Interop Links included on Council Tower price page Microwave(Loop + Hot Standby) Protected Microwave System 1 $ 108,9331 $ 108,933 $ 108,933 Microwave Antenna System included in Microwave System Price M/W Installation included in Microwave System Price i Site Civils Standby Generator System 1 $ 132,423 $ 132,423 $ 132,423 , Battery/Charger System 1 $ 42,455 $ 42,455 $ 42,455 Site-Civils Modifications Elect/Ground 1 $ 41,250 $ 41,250 $ 41,250 i 1 EquipmentShelterw/Elevated Platform 1 $ 289,888 $ 289,888 $ 289,888 Tower-Structural Analysis Only 1 $ 5,938 $ 5,938 $ 5,938 Sub-Total Equipment $ 1,046,709 City's Contingency(credit)for not installing a new Equipment Shelter yr/Elevated Platform(Amendment-1) $289,888;and a new Standby Generator System(Amendment-3)$132,423=$422,311 contingency credits ;$ Repair of existing shelter and platform cost(Amendment-2)$105,868.75`paid from contingency credits and. $ 105,868.75* s not included in the Sub-Total amount;Remaining City's Contingency(credit)after applying charge for repairing existing shelter and2latform=$316,442.25 '$ 5.B Engineering and Project Management Cost Number Listed Unit Unit Cost - Extended Cost Required Cost Site Engineering/Permits/Drawings 1 $ 100,495 $ 100,495 $ 100,495 Project Management 1 $ 78,575 $ 78,575 _ $ 78,575 Sub-Total $ 179,070 Site Engineering/Permits/Drawings and Project Management cost reduction(Amendment-8) $ (44,667) Updated Sub-Total $ 134,403 5.0 Equipment Installation Labor Cost Number Listed Unit Unit Cost Extended Cost Required Cost Equipment Installation - RF & Ant. Lot ! $ 118,410 I $ 118,410 $ 118,410 $ 118,410 iffARMS` ,..;,. ;::``- Section 1 -Price Schedule Page 7 LAI II VIL n-JlO1.0111GI IL WI V V VI R-r I IVG 01..1 IGUUIG JOI WO,V LVLL Request for Proposals(RFP)Public Safety Network,2017-006-AK City of Miami Beach,Florida 5.D Annual Maintenance Cost Qty Total Maintenance cost Maintenance cost Annual Maintenance Cost 3 years Included Sub-Total Annual Maintenance Cost $ - $ 1,344189 Updated Grand Total for Group 1(Item 5.A through 5D) -$ 1,299,522 [THE REMAINDER OF THIS PAGE IS INTENTIONALLY LEFT BLANK] Section 1 -Price Schedule Page 8 t-Allltllt fl-JlatG11ICI VI YYVI rt-f IIt,G Jt,1 IGVUIG JOIWO!Y LVGL Request for Proposals(RFP)Public Safety Network,2017-006-AK City of Miami Beach,Florida 6. Simulcast System TransmitlReceive Site#6:Mid Beach with backup Simulcast DCP 6.A Equipment DeEquip Required scri tion-RF Site Number Listed Unit p Unit Cost Extended Cost Cost Transmitters 10 $ 32,127 $ 24,095 $ 240,950 -software P25 Ph 2 Lic. 10 $ 9,500 $ 7,125 $ 71,250 Transmitters Antenna Systems 2 $ 12,924 $ 11,632 $ 23,264 Combiner Package(s) 2 $ 12,125 $ 10,913 $ 21,826 Receiver Antenna 1 $ 7,771 $ 6,994 $ ' 6,994 Tower-top Preamp 1 $ 1,990 $ 1,990 $ 1,990 Multicoupler 1 $ 2,300 $ 2,300 $ 2,300 Receivers included in Transmitters Price LAN/WAN Equipment 1 $ 76,330 $ 57,248 $ 57,248 Distributed Control Point. (DCP) - 1 Included Backup • Interop Equipment 800 MHz Interop Links included on Council Tower price page VHF Interop Links included on Council Tower price page UHF Interop Links included on Council Tower price page Smartnet/P25 Interop Links included on Council Tower price page Microwave(Loop + Hot Standby) Protected Microwave System 1 $ 108,933 I $ 108,933 $ 108,933 Microwave Antenna System included in Microwave System Price M/W Installation included in Microwave System Price Site Civils Standby Generator System 1 $ 126,050 $ 126,050 $ 126,050 Battery/Charger System 1 $ 42,455 $ 42,455 $ 42,455 Site-Civils Modifications Elect/Ground 1 $ 23,125 $ 23,125 $ 23,125 Equipment Shelter-New AC units and Fire Supression Only 1 $ 61,875 $ 61,875 $ 61,875 Tower-New on Rooftop 1 $ 55,938 $ 55,938 $ 55,938 Sub-Total Equipment $ 844,198 Cost reduction for not installing a Tower-New on Rooftop(Amendment-8) $ (55,938) Updated Sub-Total Equipment $ 788,260 City's Contingency(credit)for not installing a new Standby Generator System(Amendment-9)$126,050 $ 6.B Engineering and Project Management Cost Number Listed Unit Unit Cost Extended Cost Required Cost Site Engineering/Permits/Drawings 1 $ 98,620 $ 98,620 $ 98,620 Project Management 1 $ 78,575 $ 78,575 $ 78,575 Sub-Total $ 177,195 6.0 Equipment Installation Labor Cost Number Listed Unit Unit Cost Extended Cost Required Cost Equipment Installation- RF &Ant. Lot $ 90,630 $ 90,630 $ 90,630 Sub-Total Equipment Installation Labor $ 90,630 6.D Annual Maintenance Cost Qty ots�al Maintenance Maintenance cost Annual Maintenance Cost 3 years Included Sub-Total Annual Maintenance Cost $ - $ 1,112,023 o'itnraS- ' Section 1-Price Schedule .-.o-;o•.arm:r�cr[:: Page 9 L.A1111,L!,-V LGLGI I ICI IL Ui YY VI A-r I IL.G Vld Icu We JONUOS V LULL Request for Proposals(RFP)Public Safety Network,2017-006-AK City of Miami Beach,Florida Updated Grand Total for Group 1(Item 6.A through6.D)I $ 1,056,0851 [THE REMAINDER OF THIS PAGE IS INTENTIONALLY LEFT BLANK) "° ""' °' Section 1 -Price Schedule Z� �..i;ALI.t4ii�+.;I�FLi Page 10 • L-AIIIUIL/•t-JIOLCI I ICI IL VI V V VI It-1 IIt.0 JVI ICVUIC JQIIUCI y LVLL Request for Proposals(RFP)Public Safety Network,2017-006-AK City of Miami Beach,Florida 7. Microwave Site#7: Rebecca Towers 7.A Equipment Description- Number Listed Unit Unit Cost Extended Cost Microwave Site Equipment Required Cost • Microwave(Loop + Hot Standby) Protected Microwave System 1 $ 108,9331 $ 108,933 $ 108,933 Microwave Antenna System included in Microwave System Price M/W Installation included in Microwave System Price Sub-Total Equipmenl $ 108,933 7.6 Engineering and Project Management Cost Number Listed Unit Required Cost Unit Cost Extended Cost Site electrical drawings to legalize and bring up to code (Amendment-6). These drawings were funded out of 1 $ 48,412 $ 48,412 $ 48,412* existing available owner's contingency funds (credits) and not included in the Sub-Total amount. Sub-Total $ 48,412* Annual Maintenance Cost 13 years I Included Sub-Total Annual Maintenance Cost $ Grand Total for Group 1(Item 7.A through7.B) $ 108,933 • 8. Microwave Site#8:City Hall 8.A Equipment Description- Number Listed Unit Unit Cost Extended Cost Microwave Site Equipment Required Cost Microwave(Loop + Hot Standby) Purchase of microwave equipment (Amendment-5) This microwave equipment is funded 1 out of existing available owner's $ 36,444.60 $ 36,444.60 $ 36,444.60* contingency funds (credits) and not included in the Sub-Total amount. Microwave Antenna System included in Microwave System Price M/W Installation included in Microwave System Price Sub-Total Equipment$ 8.B Engineering and Project Management Cost Number Listed Unit Required Cost Unit Cost Extended Cost Microwave equipment and services (Amendment-8). This microwave equipment and services is funded out of existing 1 $ 91,071 $ 91,071 $ 91,071* available owner's contingency funds (credits) and not included in the Sub- Total amount. Sub-Total$ Annual Maintenance Cost 13 years I Included Sub-Total Annual MaintenanceCost $ Grand Total for Group 1(Item 8.A through 813) $ 11tia a.S"I'1`I""Inl..tun;N):err Section 1 -Price Schedule - Vim/- ..•n.n,,:a nanl{rI Page 11 LMuun ll-JlOMII 1G11L u, VVUI P-, nVG J.d1GUu1G JGUYO/Y LVLL • Request for Proposals(RFP)Public Safety Network,2017-006-AK , City of Miami Beach, Florida 9.E0C/Backup Dispatch: (Includes Main Dispatch at Police Headquarters) 9.A Equipment Description-Dispatch Equip ' Qty Listed Unit Unit Cost • Extended Cost Cost Console/Audio Gateway 17 $ 55,803 $ 41,852; $ 711,484 (Dispatch Position) 'Console/Audio' Gateway 1 (Dispatch Position for Traffic/Code) 1 $ 55,803 $ 41,852 $ 41,852 r UHF Base Stations-Fire Station Alerting 2 $ 14,430, $ 10,823' $ 21,646 UHF Antenna System 1 $ 15,644 $ 14,080' $ 14,080 WAN/LAN Equipment 2 $ 7,038, $ 5,279 $ 10,558 ' { Backup Control Stations with Remote ,17 $ 18,918' $ 14,189E $ 241,213 Controllers and Antenna System Gateway Equipment 1 $ 39,850 $ 29,888 $ , 29,888 System/Alarm Manager Computers , included in RF Core Equip price Spare Parts- Dispatch Center 1 Lot $ 55,360 $ 41,520` $ 41,520 ' Logging Recorder 2 $ 87,832 $ 87,832 $ 175,664 Site Civils - ,Standby Battery Plant System Reusing Existing Equip Emergency Generator System ;-' Reusing Existing Equip , ' Electrical Work and Grounding 1 Lot $ 32,188` $ 32,188 $ 32,188 . Sub-Total Equipment $ 1,320,093• 9.B Engineering and Project Management Cost ' Qty Listed Unit Unit Cost Extended Cost Cost . Site Engineering/Permits/Drawings 1 $ 104,245; $ 104,245. $ 104,245 Project Management , 1 ' $ 78,575 $ 78,575 $ 78,575 Sub-Total - $ 182,820 9.0 Equipment Installation Labor Cost Qty Listed Unit Unit Cost Extended Cost Cost Equipment Installation ' _` lot ' . $ - 49,948; $ 49,948 $ 49,948 Sub-Total Equipment Installation Labor $ 49,948 9.D Annual Maintenance Cost Qty Total Maintenance Maintenance cost 'Annual Maintenance Cost 3 years Included Sub-Total Annual Maintenance Cost $ - Grand Total for Group I(Item 9.A throughgD) $ 1,552,861 Ini is System Discount-.Infrastructure ' $ - (897,711) Group 1 Network Pricing'Total (Items 1 through 4) $ 7,957,022 i a . N Section 1 -Price Schedule Page 12 txnlott H-Jtatement or vvorx-vrice cneauie January ZUZ2 Request for Proposals(RFP)Public Safety Network,2017-006-AK City of Miami Beach,Florida GROUP 2. SUBSCRIBER EQUIPMENT 1. Police Department Minimum Features:AES Encryption;Multikey;OTAR;(NAP;GPS;Call Paging Alert A.Mobiles Estimated Listed Price Discont% Unit Price Extended Total Quantities XL-185M Single-band(7/800) -Motorcycle 19 $ 11,357 35% $ 7,382 $ 140,258 XL-200M Multiband(VHF/UHF/7/800) -Marine Grade 6 $ 11,467 35% $ 7,454 $ 44,724 Application XL-200M Multiband(VHF/UHF/7/800) -Command 6 $ 13,255 35% $ 8.616 $ 51,696 Vehicle remote mount w/headset jacks XL-185M Single-bond(7/800) -remote mount 393 $ 9,922 35% $ 6.449 $ 2,534,457 XL-185M Single-bond{7/800) -remote mount w/ handheld controller(delivery pending evaluation of XL . 1 19 $ 9.922 35% $ 6.449 $ 767,431 Mobile handheld controller currently in development) XL Series Multiband (VHF/UHF/7/80)remote mount 0 $ 9,008 35% $ 5.855 $ w/handheld controller Programming and Installation 543 $ 735 0% $ 735 $ 399,105 Sub-Total Mobiles: $ 3,437,671 B.Portables Estimated Quantities Listed Price Discont% Unit Price Extended Total XL-185P Single-band(7/800)with full keypad(system model) individual charger speaker mic(no antenna) ear piece 481 $ 6,775 35% $ 4,404 $ 2.118.324 belt clip D-Ring Clip/Leather Belt Loop • 2 batteries XL-200P Multiband(VHF/UHF/7/800)with full keypad (system model) individual charger 10 $ 8.505 35% $ 5.528 $ 55,280 belt clip 2 batteries Programming and Installation 491 $ 38 0% $ 38 $ 18,658 Sub-Total Portables: '$ 2,192,262 C.Control Stations Estimated Listed Price Discont% Unit Price Extended Total Quantities XL-200M Multiband (VHF/UHF/7/800)w/desktop mic 6 $ 15,895 35% $ 10,331 $ 61,986 (includes antenna system) Installation Services to existing Station PA 6 $ 735d 0% $ 735 $ 4,410 Sub-Total Control Stations: $ 66,396 D.Other Equipment ' Estimated Listed Price Discont% Unit Price Extended Total Quantities Multi-unit charger 40 $ 795 35% $ 517 $ 20.680 SPKR MIC,PREMIUM.FIRE,NC 10 $ 629 35% $ 409 $ 4.090 SPEAKER MICROPHONE 50 $ 195 35% $ 127 $ 6,350 BLUETOOTH,COVERT,EARPIECE/MIC/PIT 25 $ 179 35% $ 116 $ 2,900 EARPHONE,LAPELMICROPHONE 50 $ 65 35% $ 42 $ 2,100 COVER,SIDE CONNECTOR.XL-200P 50 $ 10 35% $ 7 $ 350 ANTENNA,FLEX,HELICAL,136-870 MHZ 50 $ 110, 35% $ 72 $ 3,600 ANTENNA,WHIP,I/4 WAVE,762-870MHZ 50 $ 40 35% $ 26 $ 1,300 BATTERY,LI-ION,31C0 MAH 50 $ 150 35% $ 98 $ 4,900 'y fy4,R 'S Section 1 -Price Schedule Page 13 txnioit N-btatement or vvont-lance bcneawe January zU22 Request for Proposals(RFP)Public Safety Network,2017-006-AK ' City of Miami Beach,Florida CHARGER,1-BAY 50 $ 170 35% $ 111 $ 5,550 WALL MOUNT KILCHARGER,6-BAY,XL-200P 10 $ 215 35% $ 140 $ 1,400 BELT CLIP,METAL 50 $ 30 35% $ 20 $ 1,000 BELT LOOP,LEATHER,PREMIUM 50 $ 60 35%. $ 39 $ 1,950 D-Swivel,P5300/P5400/P7300 50 $ 10 35% $ 7 $ 350 Radio Programmming Tools 1 $ 8,064 35% $ 5,242 $ 5,242 Sub-Total Other Equipment $ 61,762 Total Subscriber Equipment.Police Department(Item A through D): $ 6,258,091 Y�y TCNN010G 10 CO"N"'• Section 1 -Price Schedule ����oww�oowaTE�• Page 14 1—Al Ill/el/'9-Jlatal(10,IL V. Y Y VI Il-r t IUG Ju110V WG ,lal1Uat V cuct Request for Proposals(RFP)Public Safety Network,2017-006-AK City of Miami Beach,Florida 2. Fire Department Minimum Features:GPS;Call Paging Alert,Intrinsically Safe/UL Certified,Man Down,OTAP A.Mobiles Estimated Listed Price Discount Unit Price Extended Total Quantities XL-200M Multiband(VHF/UHF/7/80,0)-Marine Grade Application 2 $ 10,177 35% $ 6,615 $ 13,230 XL-200M Multiband(VHF/UHF/7/800)-Remote mount 0 $ 12,174 35% $ 7,913 $ with dual head XL-200M Multiband(VHF/UHF/7/800)-Remote mount 39 $ 10,177 35% $ 6,615 $ 257,985 Apparatus headset and installation services 3 $ 2,299 13% $ 2,000 $ 6,000 Programming and Installation 41 $ 735 0% $ 735 $ 30,135 Sub-Total Mobiles: $ 307,350 B.Portables Estimated Listed Price Discount Unit Price Extended Total Quantities XL-200P Multiband Portable(VHF/UHF/7/800) Water Resistant with full keypad (System model)-Fire Department and PSCD w/partial key pad(model 2/scan) individual charger 79 $ 8,838 35% $ 5,744 $ 453,776 premium speaker mic(no antenna) belt clip ballistic nylon case 2 batteries XL-200P Multiband Portable(VHF/UHF/7/800)Water Resistant with full keypad (System model) Fire Department and PSCD w/partial key pad(model 2/scan) individual charger premium speaker mic(no antenna) belt clip N/A N/A N/A N/A $ (140,214) ballistic nylon case 2 batteries This line item is a credit for the seventy-nine(79)XL-200P radios initially purchased for the Fire Department (See Amendment- 7)which are going to be kept by Miami Beach for going live, since the Fire Department decided on purchasing sixty-five (65) XL-400P radios that will not be ready to cutover the Fire Department to the Harris P-25 System. XL-400P Multiband Portable(VHF/UHF/7/800) Water Resistant with full keypad (System model)- Fire Department and PSCD w/partial key pad(model 2/scan) individual charger premium speaker mic(no antenna) 65 $ 7,866 $ 511,290 belt clip $ 12,100 35% ballistic nylon case • 2 batteries (These sixty-five(65)XL-400P Multiband Portable radios amount to$511,290.00,and ore being partially funded with the remaining credit balance of$373,354.00) f teRITIS` Section 1 -Price Schedule Page 15 txniclt H-statement or vvonc-i'nce scneauie January LULL • Request for Proposals(RFP)Public Safety Network,2017-006-AK _ City of Miami Beach,Florida Multiband(VHF/UHF/7/800) Water Resistant partial key pad(model 2/scan) large knobs individual charger ^ 0 $ 8,935 35% $ 5,808 $ - speaker mic(no antenna) belt clip duty case/holster 2 batteries Multiband capable(configured 7/800)w/ partial key pad(model 2/scan) large knobs individual charger 0 $ 4,375 $ speaker mic(no antenna) $ 6,730 35% - belt clip duty case/holster 2 batteries XL-185P Single-band Portable(7/800)-Water Resistant Ocean Rescue partial key pad(model 2/scan) individual charger speaker mic(no antenna) 70 $ 5,934 35% $ 3,857 $ 269,990 ear piece belt clip ballistic nylon case 2 batteries Programming and Installation 149 $ 38 0% $ 38 $ 5,662 XL-200P Multi-unit station charger 52 $ 795 35% $ 517 $ 26,884 XL-400P Multi-unit station charger 16 $ 1,119 35% $ 728 $ 11,648 Multi-unit station charger wall mount kit 20 $ 215 35% $ 140 $ 2,800 XL-200P Preminum Fire Speaker Mic 31 $ 629 35% $ 409 $ 12,679 XL-200P Premium Fire Speaker Mic (These thirty-one(31)XL-200P Premium Fire Speaker Mic ore 31 $ 629 35% $ 409 $ (12,679) being traded for credit towards the purchase of thirty-one (31)XL-400P Premium Fire Speaker Mic) XL-400P Preminum Fire Speaker Mic 31 $ 551 35% $ 358 $ 11,098 XL-200P Balistic Nylon Case 15 $ 173 ' 35% $ 112 $ 1,680 XL-200P Balistic Nylon Case (These fifteen(15)XL-200P Ballistic Nylon Cases are being 15 $ 173 35% $ 112 $ (1,680) traded for credit towards the purchase of fifteen(15)XL-400P Ballistic Nylon Cases) XL-200P Large Knob Kits 149 $ 63 35% $ 41 $ 6,109 XL-200P Large Knob Kits (These one-hundred and forty-nine(149)XL-200P Large Knob Kits are being traded,because Miami Beach is purchasing 149 $ 63 35% $ 41 $ (6,109) XL-400P portable radios.These XL-200P Large Knob Kits are not compatible with the XL-400P portable radio) Sub-Total Portables:$ 1,152,934 C.Control Stations Estimated Listed Price Discont% Unit Price Extended Total. Quantities XL-200P Multiband Control Station (VHF/UHF/7/800) 6 with desktop mic $ 14,154 35% $ 9,200 $ 55,200 Installation Services to existing Station PA 6 $ 735 0% $ 735 $ 4,410 Sub-Total Control Stations: $ 59,610 D.Fire Alerting Control Station Estimated Listed Price Discont% Unit Price Extended Total Quantities ARMS"`E„"' t.T.7,':'''. Section 1 -Price Schedule .. u�rw.s,o,.emi • Page 16 txntoir A-btaremenr or vvork-ence,cneaute January zuzz Request for Proposals(RFP)Public Safety Network,2017-006-AK City of Miami Beach,Florida UHF Configured for Fire Alert Solution 6 $ 7,699 35% $ 5,004 $ 30,024 installation Services to existing Station PA 6 $ 735 0% $ 735 $ 4,410 Radio Programmming Tools 1 $ 8,064 35% $ 5,242 $ 5,242� Sub-Total Fire Alerting Control Station, $ 39,676 E.Interop Control Stations Estimated Listed Price Discont% Unit Price Extended Total Quantities Interop Control Stations 4 $ 14,319 35% $ 9,307 $ 37,228 Sub Total Interop Control Station: S 37,228 Total Subscriber Equipment.Fire Department(Item A through D): $ 1,596,798 recHNo�ocr rocaNNec. Section 1-Price Schedule �� Page 17 LAlIlU1tA'JIOl0I110111 UI V V VI 111.0 JV1100010 JOI/UOI V LVLG Request for Proposals(RFP)Public Safety Network,2017-006-AK City of Miami Beach,Florida 3. Emergency Management Minimum Features:GPS;Call Paging Alert,OTAP A.Mobiles Estimated Quantities Listed Price Discount Unit Price Extended Total Multiband (VHF/UHF/7/800)remote mount(includes 0 $ 7,540 35% $ 4,901 $ antenna system) Programming and Installation 0 $ 735 0% $ 735 $ - • Sub-Total Mobiles: $ - B.Portables Estimated Listed Price Discount Unit Price Extended Total Quantities Multiband Portable(VHF/UHF/7/800)w/ w/partial key pad(model 2/scan) larger knobs individual charger speaker mic(no antenna) 0 $ 8,025 35% $ 5,216 $ ear piece belt clip duty case/holster vehicle charger2 batteries Multi-unit vehicular charger w/DC/AC inverter if 0 $ 826 35% $ 537 $ necessary Multi-unit station charger 0 $ 795 35% $ 517 $ - Programming and Installation 0 $ 38 0% $ 38 $ Radio Programming Tools 0 $ 8,064 35% $ 5,242 $ - Sub-Total Portables: $ - Total Subscriber Equipment Emergency Management(Item A through B): $ - • it MS° Itt14CU ,�-..rll a Section 1 -Price Schedule a°re. Page 18 txnlott H-Jtatement or vvortc-trice acneoute January Lull Request for Proposals(RFP)Public Safety Network,2017-006-AK City of Miami Beach,Florida 4. Non-Public Safety Minimum Features:GPS;Call Paging Alert,OTAP A.Portables Estimated Listed Price Discont% Unit Price Extended Total Quantities XG-15P Portable(7/800)with keypad-Non-Public Safety GPS speaker mic(no antenna) belt clip 342 $ 3,050 35% $ 1,983 $ 678,186 duty case/holster individual charger(part of XG-15P radio package) 2 batteries XG-15P Portable(7/800)with keypad-Non-Public Safety GPS speaker mic(no antenna) 40 N/A N/A N/A 77,285 These forty(40)radios are being paid from owners's contingency(credits) (Quote Dated 11-04-2020,Amendment-8 Radio Programmming Tools I $ 8,064 35% $ 5,242 $ 5,242 Programming and Installation 342 $ 38 0% $ 38 $ 12,996 Control Station 2 $ 12,203 51% $ 6,025 $ 12,050 Multi-unit station charger 21 $ 795 35% $ 517 $ 10,857 Programming and Installation 2 $ 735 0% $ 735 $ 1,470 Total Subscriber Equipment Non-Public Safety: $ 720,801 Ir111f:l :P11Fii711 • •�:•• • 3,322,308) Amend 9: Group II Total 2. Subscriber Equipment (Items I through 4) $ 5,253,382.00 APPENDIX A PROPOSAL TENDER FORM GROUP 3.TRAINING COST Description Total System Manager Training $ 81,510 Radio User Training $ 18,450 Dispatcher Training $ 28,425 Maintenance Technician Training $ 140,045 Harris Technical University (HTU) Refresher Training (1 yr, up to 500 Students) - Total Training Cost $ 268,4304 FPS" Section 1 -Price Schedule Page 19 LAI 11Vll/4-JLGLG11ICI IL VI V YVIA-1 I JVIICV VIG JCI 11401 V L{/LL • Request for Proposals(RFP)Public Safety Network,2017-006-AK • City of Miami Beach,Florida • GROUP 4.ADDITIONAL EQUIPMENT AND SERVICES ADDITIONAL EQUIPMENT AND SERVICES Description Qty Listed Unit Unit Cost Extended Cost Cost NICE Inform API for integration with $ 1 3,900 $ 3,900 $ 3,900 AQUA (Amendment-3) Installation of aluminum gate at 1 $ 24,830 $ 24,830` $ 24,830 Parking Enforcement Site (Amendment-4) Installation of grounding work at the following sites (Amendment-8): • Council Towers • Fire Station-2 • Miami Beach Police Department 1 $ 58,188.80 $ 58,188.80 $ 58,188.80 • Parking Enforcement • Rebecca Towers • Tower-41 Sixteen (16) helmet radio interfaces for the Police Department Motor Unit 1 $ 31,800.80 $ 31,800.00: $ 31,800.00 (Amendment-8) Quatermaster module for the Motion360 radio inventory software 1 $ 22,575 $ 22,575` $ 22,575 system(Amendment-8) Second microwave crew deployment to connect the following sites (Amendment-8): • Rebecca Towers • New City Hall 1 $ 10,596.30 $ 10,596.30, $ 10,596.30 • Fire Station-2 (EOC) • Tower-41 • 5660 Collins Avenue • Parking Department Interference Analysis (Amendment-8) 1 $ 15,068 $ 15,068 $ 15,068 Twenty (20) gas mask and five (5) push, I to talk cell phone radio interfaces for 1 $ 43,434.19 $ 43,434.19 $ 43,434.19 the SWAT Team (Amendment-8). Mobile Command Vehicle Tait Repeater 1 $ 22,565.11 $ 22,565.1 1: $ 22,565.11 - Funded from credits remaining after amendment 8. Additional Equipment and Services Total $ 232 957.40 All nine(9)item equipment and services listed in this chart are paid from owner's contingency(credits) Section 1-Price Schedule Page 20 LAI IIVIL IS-VlOtQ111Gl It VI YYVIIS-f IIt,Q JVIIGULLIO JOIIYOI V LVLL Request for Proposals(RFP)Public Safety Network,2017-006-AK City of Miami Beach,Florida TOTAL per Groups 1 through 4 Total amount Group 1. Network Price $ 7,957,022.00 One Time Additional Discount $ (1,715,386.00) Group 1. Network Price—Net of Discount $ 6,241,636.00 Group 2. Subscriber Equipment $ 5,253,382.00 One Time Additional Discount $ (1,945,147.00) Group 2. Subscriber Equipment-Net of Discount $ 3,308,235.00 Group 3. Training Cost $ 268,430.00 One Time Additional Discount $ - Group 3. Training Cost- Net of Discount $ 268,430.00 Group 4.Additional Equipment and Services $232,957.40 Paid with owner's contingencies(credits)and $ 232,957.40* not included as part of the Grand Total amount Group 4. Additional Equipment and Services-Net of.Discount $ - Owner's Contingencies(Credit)balance,applied towards the purchase $ (373,354.00) of XL-400P radios$511,290(Amendment 9). *Grand Total (Groups 1 through 4) $ 9,444,947.00 *Basis for cost point allocation as noted in Section 0400-4,Cost Proposal Evaluation. Grand Total of$10M Includes the following additional equipment, upgrades,and features requested by the City during negotiations: Qty 25 XG-25 portable radios(featuring OTAR and AES) replacing XG-15 unencrypted portable radios OTAR and AES features added to 25 Fire Dept portables OTAR and AES features added to 5 Erner.Mgmt portables All Police Radios are full key pad(System)models One additional Console for Traffic/Code Microwave link for the additional Console for Traffic/Code Microwave link for the ISSI Extended Warranty to 3 years including NOC Monitoring (Value of these items is$406,932) r>rrcolu;r ra caNr:aa Section 1-Price Schedule Page21 LAI.IUII/l-Jia IGtllGlll VI Ytl VI f IIt,G JVIIGYVIG JOIIUGI V LVLL Request for Proposals(RFP)Public Safety Network,2017-006-AK " City of Miami Beach,Florida GROUP 5.WARRANTY AND MAINTENANCE COST Warranty,Maintenance,Support,Software updates cost after final acceptance Infrastructure Year 4-5 $ 600,000 Infrastructure Year 6- 10 $ 1,600,000 Infrastructure Year 11 - 15 $ 1,900,000 Hardware Refresh Year 7 and Year 12 $ 1,400,000 Total Warranty/Maintenance Cost $ 5,500,000 **Grand Total (Groups 1 through 5) $ 14,944,947.00 **Contingent upon exercising of Radio Maintenance options OPTIONAL RADIO MAINTENANCE PRICING Description Total **Year 4 rough 5-Radios Maintenance $ 234,258 **Year 6 through 10- Radios Maintenance $ 649,974 **Year 11 through 15- Radios Maintenance $ 753,498 Total Radio Warranty/Maintenance Cost $ 1,637,730 OTHER OPTIONAL PRICING Description Total. Ad•i Tonal Channe at 4 i es up o 12 c anne s $ 130,460 Additional Channel at 4 Sites (13 channels up to 16 channels) $ 165,111 ISSI Microwave Links (Cities of Aventura, Hialeah, and Coral $ 312,071 Gables) Spare Parts-Subscriber Equipment $ 725,416 Test Equipment $ 224,847 Additional ISSI Talkpaths (Qty of 5) $ 9,375 **Per RFI response dated June 19,2017 Bidder's Affirmation Company:Harris Corporation , Authorized Representative:Lori Rodriguez Address:221 Jefferson Ridge Parkway,Lynchburg VA 24501 • Telephone:43445S9240 Email:Irodril3@harris.com Authorized Representative's Signature: • j JJS` IFt .NCLJG, Section 1 -Price Schedule Page 22