Resolution 2022-32093 RESOLUTION NO. 2022-32093 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE CITY MANAGER TO NEGOTIATE AND EXECUTE A CHANGE ORDER, IN AN AMOUNT NOT TO EXCEED $1,540,000, TO THE CONSTRUCTION CONTRACT BETWEEN THE CITY OF MIAMI BEACH AND LANZO CONSTRUCTION CO., TO PROCEED WITH THE COMPLETION OF THE , ROADWAY CONSTRUCTION FOR THE VENETIAN ISLANDS BID PACKAGE 13C, RIGHT-OF-WAY NEIGHBORHOOD IMPROVEMENT PROJECT, UTILIZING WATER TRANSPORT SERVICES TO FERRY EQUIPMENT AND MATERIAL TO AND FROM THE VENETIAN ISLANDS, SUBJECT TO AND CONTINGENT UPON THE CONTRACTOR, FINDING AND REACHING AN AGREEMENT WITH THE OWNERS OF PRIVATE VACANT LOTS, AT LEAST ONE IN EACH OF THE THREE ISLANDS, FOR THE PURPOSE OF SERVING AS A WATER TRANSPORT LANDING AND LAUNCH SITE, SUBJECT TO AND CONTINGENT UPON AN.APPROPRIATION OF FUNDS IN THE NEXT AMENDMENT TO THE FY21122 CAPITAL BUDGET. WHEREAS,_ on March 13, 2013, the Mayor and City Commission awarded a construction contract(the"Contract")to Lanzo Construction Co. Florida (the"Contractor")for the Venetian Islands Bid Package 13C,Right of Way Neighborhood Improvement project(San Marino, Dilido, and Rivo Alto); and WHEREAS, Notice to Proceed 2 (NTP2) for construction was issued effective November 4, 2013; and WHEREAS, between February 2014 and January 2016, the City's Storm Water Management Master Plan was revised, following the recommendations of the Mayor's Blue- Ribbon Panel on Flooding and Sea Level Rise and of the Flooding Mitigation Committee; and WHEREAS, recommendations resulted in an upgraded stormwater system with upsized pipes and six new stormwater pump stations with all related equipment and structures, being added to the project scope; and WHEREAS, in 2015, Miami-Dade County and the Florida Department of Transportation (FDOT) implemented a weight restriction on the bridges which service the Venetian Islands, reducing the bridge load capacity by 40%, affecting the allowable weight of the loads the trucks could haul for subgrade and base materials; and WHEREAS, on October 14, 2020, the City Commission adopted Resolution 2020- 31434, directing the Administration to take the necessary action to complete the roadway restoration,which includes milling the existing asphalt, scarifying the base rock, reworking the base rock where needed, including replacement of 2 inches of new asphalt matching the proposed elevation of the original plans; and • WHEREAS, in November 2020, the Contractor started the permitting process with Miami-Dade County and obtained Special Overweight Vehicle Permits with the already imposed weight restrictions from 2015; and WHEREAS, on January 11,2021, the City Manager executed Change.Order No. 8 as a negotiated agreement for the contractor to complete the corrective measures and the pending scope items, including signage and striping,for the remaining balance in the contract, resulting in a total credit of$40,000 to the contract value; and WHEREAS, on March 18, 2021, Miami-Dade County voided all Special Overweight Vehicle Permits for travel on the Venetian Causeway, citing an upcoming reduction to the load capacity of the bridges; and WHEREAS, in May 2021, the County provided a reduced maximum allowable bridge loading, which limits were further reduced on June 23, 2021, jeopardizing the ability to properly place the asphalt; and WHEREAS, with such restricted loading capacities, the volume of material was so limited that the asphalt supplier could no longer warrant that the material would be delivered and placed prior to cooling beyond allowable tolerances; and WHEREAS, on July 28, 2021, the City Commission discussed the status of the road improvement project and associated bridge restrictions and during that discussion, City staff summarized the potential solutions to the bridge restrictions, including the possibility of using barges to transport material to the islands; and WHEREAS, the City Commission was supportive of any solution which would expedite the conclusion of this project, including additional funding which may be required to do so; and WHEREAS, in October 2021, the option of including water transport operations to. bypass the bridges with loaded trucks was presented to the Venetian Islands Homeowner's Association who were in support of the proposed resolution; and WHEREAS, on December 3, 2021, the Contractor submitted a proposal in the amount of $1,031,737 to perform the remaining scope of the Contract, utilizing barges to bring the equipment and material into the Venetian Island; and WHEREAS, the ability to complete the roadway restoration scope of the Contract is contingent on the Contractor's ability to identify at least three vacant private properties, one on each island, that can be used as a landing or launching site for the barges; and WHEREAS, due to the regularly changing availability of properties which may serve as potential sites, the contractor is unable to commence negotiations with private property owners prior to approval of an additional change order; and WHEREAS,on March 9,2022,the City Commission discussed the status of roadway construction on the Venetian Islands, urging the administration to expedite the improvements; and 2 i i • WHEREAS, the City Commission approved and authorized the Administration to negotiate and_execute a change order with the contractor, in an amount not to exceed , $1,400,000, plus a 10% contingency, bringing the total amount not to be exceeded to $1,540,000, to proceed with the pavement restoration of the three islands, utilizing water transport to ferry equipment and material to and from shore into the islands; and WHEREAS, this change request is not considered a major change since the project scope is'the same and it does not require re-design or revisions to any design elements, and does not result in a project construction cost increase of more than 10%; and WHEREAS, a Capital Budget amendment will be presented to the City Commission under a separate legislative item, with an amount not to exceed $1,540,000, to fund the additional construction and costs associated with the additional scope of work; and • NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, to approve and authorize the City Manager to negotiate and execute a change order, in an amount not to exceed $1,540,000, to the construction contract between the City of Miami Beach and Lanzo Construction Co., to proceed with the completion of the roadway construction for the Venetian Islands Bid Package 13C, Right-of-Way Neighborhood Improvement Project, utilizing water transport services to ferry equipment and material to and from the Venetian Islands, subject to and contingent upon the contractor finding and reaching an agreement with the owners of private vacant lots, at least one in each of the three islands, for the purpose of serving as a water transport landing and launch site subject to and contingent upon an appropriation of funds on the next amendment to the FY21/22 capital budget. vy� PASSED and ADOPTED this r day of mQrc,L. , 2022. 12-z1Z----____ Dan Gelber, Mayor ATTEST: - !.BEq''''', s---1 1 INCORPORATED= s Rafael E. G nado, City Clerk , ,®.. k _' '� 4. MAY 1 0 2022 APPRO FORM&LANGUAGTO &FOR EXECUTIONVEDASE Ci— a- - - - City Attorney Date 3 New Business and Commission Requests-R9 S MIAMI BEACH COMMISSION MEMORANDUM • TO: Honorable Mayor and Members of the City Commission FROM: Commissioner Mark Samuelian DATE: March 9, 2022 SUBJECT: DISCUSS,AND POTENTIAL ACTION ON THE STATUS OF THE ROADWAY CONSTRUCTION PROJECT ONGOING ON THE VENETIAN ISLAND. BACKGROUND/HISTORY Discuss and take potential action on the status of the roadway construction project ongoing on the Venetian Island. The Commission has taken an active role in ensuring the timely and orderly completion of these critical infrastructure projects since its inception.Attached you will find Reso 2020-31434 for reference. SUPPORTING SURVEY DATA N/A FINANCIAL INFORMATION TBD Applicable Area Citywide Is this a"Residents Right Does this item utilize G.O. to Know" item. pursuant to Bond Funds? City Code Section 2-14? Yes No Strategic Connection Non-Applicable Legislative Tracking Commissioner Mark Samuelian ATTACHMENTS: Description o Reso 2020-31434 Page 770 of 874 RESOLUTION NO. 2020-31434 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ACCEPTING THE LAND USE AND SUSTAINABILITY COMMITTEE'S RECOMMENDATION AND DIRECTING STAFF TO PROCEED WITH OPTION 2,AS SET FORTH IN THIS RESOLUTION, FOR THE COMPLETION OF THE ROADWAY CONSTRUCTION OF THE VENETIAN ISLANDS BID PACKAGE 13C, RIGHT-OF-WAY NEIGHBORHOOD IMPROVEMENT PROJECT. WHEREAS, on September 9, 2009, pursuant to Request for Qualifications(RFQ)No. 42- 08/09, the Mayor and City Commission adopted Resolution No. 2009-27161, approving and authorizing the Mayor and City Clerk to execute a Professional Services Agreement with Schwebke-Shiskin &Associates, Inc. (SS&A);and . WHEREAS, SS&A was tasked to provide professional services for the design, bid,award, field inspection, and construction administration of the Venetian Island Bid Package 13c, Right- Of-Way Neighborhood Improvement Project(Project); and WHEREAS, on March 13th, 2013, pursuant to Invitation to Bid (lTB) No. 49-11/12, for the Right-of-Way Infrastructure Improvement Program--Venetian Islands Bid Package 13C, the City Commission adopted Resolution No. 2013-28163, recommending the award of a construction contract to Lanzo Construction Co. Florida, (Lanzo) in the amount of $11,373,491 including contingency; and WHEREAS, the scope of work included, site preparation, earthwork, demolition, storm drainage, roadway paving, sidewalks, concrete valley gutters, watermain installation and street lighting on the islands of San Marino, Di Lido and Rivo Alto;and WHEREAS,the Notice to Proceed(NTP2)for construction was issued November 4,2013; and. WHEREAS, between February 2014 and January 2016, the City's Storm Water Management Master Plan was revised, following the recommendations of the Mayor's Blue- Ribbon Panel on Flooding and Sea Level Rise and of the Flooding Mitigation Committee; and WHEREAS,an enhanced stormwater system criteria was implemented in the Project,and revisions to the design were made by SS&A that included an upgraded stormwater system with no road raising consideration due to the advanced construction stage of the project; and WHEREAS,the revised design included installation of six new stormwater pump stations within existing easements in the three islands and the installation of the pumps at these proposed locations, was heavily opposed by the residents and required several months of research and negotiations to achieve approval; and WHEREAS, consequently, various change orders were issued to Lanzo's contract, incorporating an upgraded stormwater system with upsize pipes and six new stormwater pump stations with all related equipment and structures, as well as other unforeseen conditions; and Page 771 of 874 WHEREAS, the contractor encountered unsuitable materials (muck) during excavation activities, an unforeseen condition, and the project team determined that the appropriate mitigation was to implement a revised road restoration detail, by using a mixture of the existing and new subgrade materials to be used as a subgrade and installing Geosynthetic Grid (GEOGRID)between the limerock base and the subgrade; and WHEREAS, this decision was made in consideration of the load capacity restrictions of the Venetian Causeway bridges, implemented in 2014 by Miami-Dade County and FDOT, which affected the allowable weight loads the trucks could haul for subgrade and base materials, reducing the truck load capacity by 40%, making removal and import of large amounts of materials impractical; and WHEREAS, all drainage, watermain, sewer and lighting work has been completed, including all six (6) stormwater pump stations and the restoration of the easements, and the remaining contractual scope of work includes the placement of the final lift of asphalt; and WHEREAS,the total construction contract amount to date, including added scope and all other changes is$28,671,330; and WHEREAS, installation of the first lift of asphalt began in San Marino Island on May 20, 2015 and within the first month of installation, cracks became evident and following the installation of the first lift of asphalt on the other two islands, similar cracks developed in varying degrees; and WHEREAS, Lanzo was notified of the pavement failures and they attempted to correct the issue by applying a crack filler designed for asphalt repairs and Lanzo also applied a micro-resurfacing layer on some areas in San Marino Island; and WHEREAS, the project did not include raising of the roads and the final road elevations range from 1.06' to 4.86' NAVD in San Marino Island, from 1.86' to 6.16' NAVD in DiLido Island and from 2.06'to 3.46' NAVD in Rivo Alto Island; and WHEREAS,during construction of the roadway system,the project's Resident Project Representative (RPR), SS&A, issued Lanzo more than sixty(60) notices of non-compliance, where more than fifteen of the notices related to improper mixing of subgrade materials, placement of asphalt during wet conditions, and improper handling of backfill material; and WHEREAS, SS&A and the City did not accept Lanzo's attempted asphalt repairs, as they did not address the cause of the premature asphalt cracking and in order to determine the underlying cause, and following SS&A's recommendations, the City tasked the project's geotechnical firm, Universal Engineering (Universal), with performing geotechnical testing on the roadway of all three Islands; and WHEREAS, test results common to all three islands, as provided by Universal, indicated that some areas of the roadway have less than the required overall limerock base and stabilized subgrade thickness; and WHEREAS, additionally, results in some areas showed the migration of silt into the limerock base, thereby reducing the pavement assembly strength; and Page 772 of 874 WHEREAS, at the City's direction, SS&A analyzed Universal's geotechnical data and was directed to submit a roadway design with a design life of 20 years and SS&A determined that additional testing was required and hired the professional services of a third-party geotechnical consultant, NV5; and WHEREAS, NV5 conducted the additional testing and prepared a report that included alternatives ranging from full-depth section replacement, to partial replacement and/or reworking of the existing materials and as a result, SS&A proposed a roadway remediation design which incorporates several assemblies varying from total road reconstruction to simply placing an asphalt overlay; and WHEREAS,upon review of all tests reports and recommendations,City staff has identified four options to proceed with the completion of the project Option No.1 Proceed with SS&A's proposed restoration,which includes full-depth section replacement in some areas, partial replacement and/or reworking of the existing materials, in other areas, and provides a pavement design life of 20 years. This option is highly invasive and causes considerable impact to the residents. In addition, it does not address sea level rise impacts to the road base, requiring reconstruction to address the road raising, prior to the end of the design life of the road. Estimated cost is nearly$3 Million. The work could be completed in 6 months; Option No. 2 Milling the existing 1-inch lift of asphalt, scarifying the base rock, rework the base rock where needed and placement of 2 or more inches of new asphalt matching the proposed elevation on the original plans. The three islands would be added to the City's Road Elevation Strategy and Neighborhood Project Prioritization program, for a future roadway improvement project. This option is less invasive than option No.1 and provides a uniform restoration process to the pavement of all three islands. This option will add an estimated pavement life of several years. Estimated cost$2,4 Million. The work could be completed within 4 months; Option No. 2B Milling the existing 1-inch lift of asphalt on sections of the roadway and overlaying with 2 inches of new asphalt the entire roadway matching the proposed elevation on the original plans. The three islands would be added to the City's Road Elevation Strategy and Neighborhood Project Prioritization program,for a future roadway improvement project. This option is the least invasive and less impactful to the residents providing an estimated pavement life of several years. Estimated cost$1 Million. The work could be completed within 3 months; Option No. 3 Proceed with full reconstruction of the roadway, raising the roads to the current or new criteria. This could entail re-design of the stormwater system to meet the determined criteria, in addition to the road raising and harmonization efforts, ultimately resulting in a lengthy construction process and costs in excess of$10 million; and WHERAS, the data obtained indicates that the roadway failure is attributable to the construction deficiencies, and among other things, exacerbated by the interaction of the high ground water table with the roadway assembly; and Page 773 of 874 WHEREAS, the City is currently withholding $1,361,429 in retainage and approximately $1,355,000 remaining in the contract for work not performed, for a total of approximately $2,716,900, and the retainage is the portion of the contract price intentionally withheld until the work is substantially complete to assure the contractor will satisfy its obligations and complete a construction project; and WHEREAS, City staff has met with and presented the options to representatives from the Venetian Islands Homeowner's Association (VIHA), and VIHA agreed with staff that Option 2 is reasonable in addressing some of their concerns; and WHEREAS,on September 22,2020, City staff presented the three options detailed above for the completion of the Project to the Land Use and Sustainability Committee(LUSC); and WHEREAS,the different options were discussed, and the Venetian Islands Homeowner's Association, represented by their president, expressed their support for Option 2; and WHEREAS, the LUSC asked staff to bring a Resolution to the full City Commission in support of Option 2, with the direction to encourage the City Administration to start working on finalizing the plan and begin work as soon as possible; and WHEREAS, the Administration recommends that the City Commission approve the Resolution. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA that the Mayor and City Commission hereby accept the Land Use and Sustainability Committee's recommendation and direct City Administration to proceed with Option 2, as set forth in this Resolution, for the completion of the roadway construction of the Venetian Islands Bid Package 13C, Right-of-Way Neighborhood Improvement Project. PASSED and ADOPTED this 14 day of O0106er , 2020. d4::211.4!„...„. Dan Gelber, Mayor ATTES . l / / APPROVED AS 7O 4141u FORM&LANGUAGE &FOR EXECUTION Rafael E. Granado, City Clerk ��.,,-- �` '�(�"' 1 r _C- 2. C y ' ,` f ��� Cdy Attamey Date ,.: 7:' -�\ ��° '....C)\;\ , 7 :INC°RP . `I „ OR--A r�p ;Q.r %. � � '( —_ ti �M .t Resolutions-C7 B MIAMI BEACH COMMISSION MEMORANDUM TO: Honorable Mayor and Members of the City Commission FROM: Jimmy L. Morales, City Manager DATE: October 14,2020 - SUBJECT:A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ACCEPTING THE LAND USE AND SUSTAINABILITY COMMITTEE'S RECOMMENDATION AND DIRECTING STAFF TO PROCEED WITH OPTION 2 FOR THE COMPLETION OF THE ROADWAY CONSTRUCTION OF THE VENETIAN ISLANDS BID PACKAGE 13C, RIGHT-OF-WAY NEIGHBORHOOD IMPROVEMENT • PROJECT. RECOMMENDATION • The Administration recommends proceeding with Option 2. BACKGROUND/HISTORY On September 9,2009, pursuant to Request for Qualifications (RFQ) No.42-08/09,the Mayor • and City Commission adopted Resolution No. 2009-27161, approving and authorizing the Mayor and City Clerk to execute a Professional Services Agreement with Schwebke-Shiskin & Associates, Inc. (SS&A) to provide professional services for the design, bid, award, field inspection, and construction administration of the Venetian Island Bid Package 13c, Right-Of- Way Neighborhood Improvement Project. On March 13th, 2013, pursuant to Invitation to Bid (ITB) No. 49-11/12, for the Right-of-Way Infrastructure Improvement Program — Venetian Islands Bid Package 13C, the City Commission adopted Resolution No. 2013-28163, recommending the award of a construction contract to Lanzo Construction Co. Florida, (Lanzo) in the amount of $11,373,491 including contingency. The scope of work included, site preparation, earthwork, demolition, storm drainage, roadway paving, sidewalks, concrete valley gutters, watermain installation and street lighting on the islands of San Marino, Di Lido and Rivo Alto. Notice to Proceed (NTP2)for construction was issued effective November 4,2013. Between February 2014 and January 2016, the City's Storm Water Management Master Plan was revised, following the recommendations of the Mayor's Blue-Ribbon Panel on Flooding and Sea Level Rise and of the Flooding Mitigation Committee. As such an enhanced stormwater system criteria was implemented in the project, and revisions to the design were made by SS&A. Revisions included an upgraded stormwater system with no road raising Page 198 of 1576 Page 775 of 874 consideration due to the advanced construction stage of the project. The revised design included installation of six new stormwater pump stations within existing easements in the three islands. The installation of the pumps at these proposed locations,was heavily opposed by the residents and required several months of research and negotiations to achieve approval. Consequently, various change orders were issued to Lanzo's contract, incorporating an upgraded stormwater system with upsize pipes and six new storrnwater pump stations with all related equipment and structures,as well as other unforeseen conditions. The contractor encountered unsuitable materials (muck) during excavation activities, an unforeseen condition. The project team determined that the appropriate mitigation was to implement a revised road restoration detail, by using a mixture of the existing and new subgrade materials to be used as a subgrade and installing Geosynthetic Grid (GEOGRID)between the limerock base and the subgrade. This decision was made in consideration of the load capacity restrictions of the Venetian Causeway bridges, implemented in 2014 by Miami-Dade County and FDOT, which affected the allowable weight loads the trucks could haul for subgrade and base materials, reducing the truck load capacity by 40%, making removal and import of large amounts of materials impractical. Currently, all drainage, watermain, sewer and lighting work has been completed, including all six (6) stormwater pump stations and the restoration of the easements. The remaining contractual scope of work includes the placement of the final lift of asphalt. The total construction contract amount to date, including added scope and all other changes is$28,671,330. ANALYSIS Installation of the first lift of asphalt began in San Marino Island on May 20,2015.Within the first month of installation, cracks became evident. Following the installation of the first lift of asphalt on the other two islands,similar cracks developed in varying degrees. Lanzo was notified of the pavement failures and they attempted to correct the issue by applying a crack fiber designed for asphalt repairs. They also applied a micro-resurfacing layer on some areas In San Marino I sland. The project did not include raising of the roads.The final road elevations range from 1.06' to 4.86'NAVD in San Marino Island, from 1.86'to 6.16'NAVD in DiLido Island and from 2.06'to 3.46'NAVD in Rivo Alto Island. During construction of the roadway system, the project's Resident Project Representative (RPR), SS&A, issued Lanzo more than sixty(60) notices of noncompliance,where more than fifteen of the notices related to improper mixing of subgrade materials, placement of asphalt during wet conditions, and improper handling of backfill material. SS&A and the City did not accept Lanzo's attempted asphalt repairs, as they did not address the cause of the premature asphalt cracking. In order to determine the underlying cause, and following SS&As recommendations, the City tasked the project's geotechnical firm, Universal Engineering (Universal), with performing geotechnical testing on the roadway of all three Islands. Test results common to all three islands,as provided by Universal, indicated that some areas of the roadway have less than the required overall limerock base and stabilized subgrade Page 199 of 1576 Page 776 of 874 thickness.Additionally, results in some areas showed the migration of silt into the limerock base, • thereby reducing,the pavement assembly strength. At the City s direction, SS&A analyzed Universal's geotechnical data and was directed to submit a roadway design with a design life of 20 years. SS&A determined that additional testing was required and hired the professional services of a third-party geotechnical consultant, NV5. NV5 conducted the additional testing and prepared a report that included alternatives ranging from full-depth section replacement,to partial replacement and/or reworking of the existing materials. As a result, SS&A proposed a roadway remediation design which incorporates several assemblies varying from total road reconstruction to simply placing an asphalt overlay. Upon review of all tests reports and recommendations, city staff has identified four options to proceed with the completion of the project: Option No.1 Proceed with SS&A's proposed restoration, which includes full-depth section replacement in some areas, partial replacement and/or reworking of the existing materials, in other areas, and provides a pavement design life of 20 years. This option is highly invasive and causes considerable impact to the residents. In addition, it does not address sea level rise impacts to the road base, requiring reconstruction to address the road raising, prior to the end of the design life of the road. Estimated cost is nearly$3 Million. The work could be completed in 6 months. Option No.2 Milling the existing 1-inch lift of asphalt, scarifying the base rock, rework the base rock where needed and placement of 2 or more inches of new asphalt matching the proposed elevation on the original plans.The three islands would be added to the City s Road Elevation Strategy and Neighborhood Project Prioritization program, for a future roadway improvement project. This option is less invasive than option No.1 and provides a uniform restoration process to the pavement of all three islands. This option will add an estimated pavement life of several years. Estimated cost$2,4 Million. The work could be completed within 4 months. ' Option No.28 Milling the existing 1-inch lift of asphalt on sections of the roadway and overlaying with 2 inches of new asphalt the entire roadway matching the proposed elevation on the original plans.The three islands would be added to the City's Road Elevation Strategy and Neighborhood Project Prioritization program, for a future roadway improvement project. This option is the least - invasive and less impactful to the residents providing an estimated pavement life of several years. Estimated cost$1 Million.The work could be completed within 3 months. Option No.3 Proceed with full reconstruction of the roadway, raising the roads to the current or new criteria. This could entail re-design of the stormwater system to meet the determined criteria, in addition to the road raising and harmonization efforts, ultimately resulting in a lengthy -construction process and costs in excess of$10 million. The data obtained indicates that the roadway failure is attributable to the construction Page 200 of 1576 • Page 777 of 874 deficiencies, and among other things, exacerbated by the interaction of the high ground water table with the roadway assembly. The City is currently withholding $1,361,429 in retainage and approximately $1,355,000 remaining in the contract for work not performed, for a total of approximately $2,716,900. Retainage is a portion of the contract price deliberately withheld until the work is substantially complete to assure the contractor will satisfy its obligations and complete a construction project. City staff has met with and presented the options to representatives from the Venetian Islands Homeowner's Association (VI HA), who found option 2, as recommended by staff, reasonable in addressing some of their concerns. • On September 22, 2020, city staff presented the options detailed above, for the completion of the project, to the Land Use and Sustainability Committee (LUSC).The different options were discussed,and the Venetian Islands Homeowner's Association, represented by their president, expressed their support for option 2. The LUSC asked staff to bring a resolution to the full Commission in support of option 2 with the direction to encourage city administration and the City s Attorney's office to start working on finalizing the plan and begin work as soon as possible. CONCLUSION The Administration recommends acceptance of the Land Use and Sustainability Committee recommendation to proceed with the completion of the project by implementing option 2. Applicable Area South Beach Is this a"Residents Right Does this item utilize G.O. to Know" item.pursuant to Bond Funds? City Code Section 2.14? Yes No Legislative Tracking Capital Improvement Projects ATTACHMENTS: Description o Resolution • Page 201 of 1576 Page 778 of 874 THIS PAGE INTENTIONALLY LEFT BLANK