Loading...
Amendment No.7 Engineering Services Agreement 2�22,•�21g2 - _ DocuSign Envelope ID:F5AD2972-F964-479C-B080-F199666A19BA • C-1 J a 2.27 2,QA AMENDMENT No. 7 TO THE PROFESSIONAL ENGINEERING SERVICES AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND RIBBECK.ENGINEERING; INC. DATED July 26, 2016 FORTHE PROVISION OFADDITIONAL ENGINEERING SERVICES FOR THE INDIAN CREEK DRIVE/STATE ROAD (SR)AlA, 26 STREET TO 41 STREET-FLOOD MITIGATION PROJECT IN THE AMOUNT OF $68;500.00 This Amendment No. 7 to the Agreement is made and entered this 2day of c f 2022, by and between the CITY OF MIAMI BEACH, a municipal corporation existing under the laws:of the State of Florida (the City"), havi'ng its principal offices at 1700 Convention Center Drive; Miami Beach, Florida 33139, and Ribbeck Engineering. Inc., a Florida Corporation having its principal office at 14335.SW 120 St. #205, Miami, Florida 33146 (the "Consultant"). RECITALS WHEREAS, On March 9, 2016, the Mayor and City Commission adopted Resolution 2016-29332 approving a Department Funded Agreement(DFA)between the City and the Florida Department of Transportation (FDOT) for the :cost sharing of a construction project on Indian Creek Drive from 26th to 41st Streets; and WHEREAS, On June 8,2016,the Mayor and City Commission adopted Resolution 2016- 29456; approving the award of a professional service s agreement to Ribbeck Engineering, Inc., in the total amount of$407,851, to develop the Design Criteria Package (D.CP)and conceptual plans for approximately 0.85 miles of Indian Creek Drive.; and WHEREAS, the"Interim" Phase construction for the Underground drainage component, including drainage pipes ranging in size up to 72 inches in diameter, drainage structures,24-inch diameter storm drainage pipes along the side streets, the pump station structure and roadway drainage system is now substantially completed;and WHEREAS,on April 26, 2017,the Mayor and City Commission adopted Resolution 2017- 29839, authorizing the negotiation of Amendment No. 1 to the Professional Services Agreement with Ribbeck Engineering, Inc., in the amount.of$863,171.92 plus a $86,317.19 contingency, for a total amount of $949,489.11, to prepare a set.of"Interim" construction plans from 25th to 26th Streets,and 26th to 41st Streets, including side streets along the entire project limits; and WHEREAS, on October 18„ 2017, the Mayor and City Commission adopted Resolution 2017-30070, authorizing the negotiation of Amendment No. 2 to the Professional Services Agreement with Ribbeck Engineering, Inc., in.the amount of$1,056,347.77, plus a$158,452.17 owner's.contingency of fifteen percent (15%), for total amount of$1,214,799.94, to complete the"Ultimate" Phase final signed and sealed;construction plans for the entire project limits; and 1 DocuSign Envelope ID:F5AD2972-F964-479C-B080-F199666A19BA WHEREAS, On October 30, 2018, the Mayor and City Commission adopted Resolution 2018-30547, authorizing Amendment No.3 to the Professional Services Agreement with Ribbeck Engineering, Inc., in the amount of$308,364.46, plus a ten percent (10%) owners' contingency in the amount of$30,836.05, fora total of$339,196.50; and WHEREAS,on September 11,2019, the Mayor and City Commission adopted Resolution 2019-30943, authorizing Amendment No.4 to the Professional Services Agreement with Ribbeck Engineering, Inc., in the amount of$383,670.00; and WHEREAS,on June 24,2020, the Mayor and City Commission adopted Resolution 2019- 31292, authorizing Amendment No.5 to the Professional Services Agreement with Ribbeck Engineering, Inc., in the amount of$350,270.73; and WHEREAS, on July 28, 2021, the Mayor and City Commission adopted Resolution 2021- 31792, authorizing Amendment No. 6 to the Professional Services Agreement with Ribbeck Engineering, Inc., in the amount of$125,541.19; and WHEREAS, community representatives have requested the incorporation of a protected bicycle lane through the replacement of the bike lane delineators (the vertical plastic poles) with a modular segregation system (Zicla Zipper) and associated pavement markings; and WHEREAS, on May 19, 2022, Ribbeck Engineering Inc. submitted a cost proposal for Amendment No. 7 to the Agreement in the amount of$68,500, to provide additional engineering services for the Zicla Zipper System as a bike lane separator; and WHEREAS, this amendment No 7 in the amount of$68,500,for analysis, design and post design services for the Zicla Zipper bile lane separator has been reviewed by staff and was found to be fair and reasonable. WHEREAS, this Amendment No. 7, will bring the total contract amount to$3,839,318.48 and NOW, THEREFORE, the parties hereto, and in consideration of the mutual promises, covenants, agreements, terms, and conditions herein contained, and other good and valuable consideration, the respect and adequacy are hereby acknowledged, do agree as follows: 1. ABOVE RECITALS The above recitals are true and correct and are incorporated as a part of this Amendment No.7. 2. MODIFICATIONS (a) The Agreement is amended, as provided herein and in Exhibit "A" attached hereto; and (b) In consideration for the services to be performed under this Amendment No. 7, City shall pay Consultant the not-to-exceed amount of $68,500.00, increasing the agreement amount to $3,839,318,48, as provided in Exhibit"A", attached hereto. 3. OTHER PROVISIONS. All other provisions of the Agreement, as amended, are unchanged and shall remain in full force and effect. 2 DgcuSign Envelope ID:F5AD2972-F964-479C-B080-F199666A19BA J 4. RATIFICATION The City:and Consultant ratify the terms of the Agreement, as amended by this Amendment No. 7. IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 7 to be executed in their names by their duly authorized officials as of the date first set forth above. ATTEST: 'CITY OF MIAMI BEACH, FLORIDA �O r2��Z sa-`�-- ,ist2.7.........e_______: Rafael7--- 4 anada Dan Gelber City Clerk ,8,,,,� Mayor- , ATTEST:: IIICOIIP OAATEDI CONSULTANT: \" '4'_ s, ,_ RISBECK ENGINEERING, INC. Secretary Principal DocuSigned by: , —DDooc�uSSigned by: LA42D129F7E8C479 tAtttr 6/27/2022 2:42 PN E`0� Pk6/27/2022 1 7:24 AM• PI . —RAFrIMIAFR7ARR Print Name • Print Name APPROVED AS TO FORM&LANGUAGE &FOR EXECUTION , City Attorney ree Date 3 MIAMIBEACH Office of Capital Improvement Projects COVER SHEET . • FROM: Office of Capital Improvements Projects Luigi Molina Ext. 26424 DROP OFF DATE: 06/27/2022 DOCUMENT(S):Amendment No. 7—City of Miami Beach / Ribbeck Engineering, Inc. CW Amendment